CITY OF SANTA BARBARA
CITY COUNCIL
Randy Rowse
Mayor
Kelly McAdoo
City Administrator
Mike Jordan
Mayor Pro Tempore
Mike Jordan
Ordinance Committee Chair
Sarah J. Knecht
City Attorney
Alejandra Gutierrez
Finance Committee Chair
Eric Friedman
Oscar Gutierrez
Meagan Harmon
Kristen W. Sneddon
City Hall
735 Anacapa Street
http://www.SantaBarbaraCA.gov
NOVEMBER 12, 2024, 2:00 PM
AGENDA
IN-PERSON PUBLIC COMMENT: At the beginning of each meeting of the City Council, Finance Committee, or Ordinance Committee, any member of the public may address the City Council concerning any item not on the Council's agenda. Any person wishing to make such address should first complete and deliver a "Request to Speak" form prior to the time that public comment is taken up by the City Council. Each speaker will be given a total of 3 minutes to address the Council. Pooling of time is not allowed during general public comment. The time allotted for general public comment at the beginning of the 2:00 p.m. session is 30 minutes.
Any member of the public who did not speak during the 2:00 p.m. session but who submitted a request to do so during the 2:00 p.m. 30 minute session may do so at the end of the meeting when the additional “Public Comment (If Necessary)” is announced. The City Council, upon majority vote, may decline to hear a speaker on the grounds that the subject matter is beyond their jurisdiction.
REMOTE PUBLIC COMMENT: Members of the public wishing to speak must “raise their hand” in the Zoom platform by selecting the virtual hand icon when their item is called. The keyboard shortcut for this is Alt+Y for Windows and Option+Y for Macs. City staff will activate the speaker’s microphone when the speaker’s name is called. The speaker will then need to unmute themselves. The keyboard shortcut for this is Alt+M for Windows or Command-Shift-A for Macs.
HOW TO REMOTELY OBSERVE AND/OR SPEAK LIVE AT A MEETING
• Web: https://santabarbaraca-gov.zoom.us/webinar/register/WN_JJS2kazqRyu2i83tshCkPw (Participation via Zoom)
• Telephone: Dial 1-669-900-6833, Enter Webinar ID: 894 2384 2846 (press *9 to raise/lower hand; press *6 to mute/unmute) • Online Streaming: Council meetings are streamed live at www.SantaBarbaraCA.gov/CAP • TV: Each regular City Council meeting is broadcast live in English and Spanish on City TV Channel 18 and rebroadcast in English on Wednesdays and Thursdays at 7:00 p.m. and Saturdays at 8:00 a.m., and in Spanish on Sundays at 3:00 p.m.
Each televised Council meeting is closed captioned for the hearing impaired. Check the City TV program guide at www.santabarbaraca.gov/citytv for rebroadcasts of Finance and Ordinance Committee meetings.
WRITTEN PUBLIC COMMENT: Public comments may also be submitted via email to [email protected] prior to the beginning of the Council Meeting. All public comments submitted via email will be provided to City Council and will become part of the public record.
(CONTINUED ON NEXT PAGE)
ORDER OF BUSINESS: Regular meetings of the Finance Committee and the Ordinance Committee begin at 12:00 p.m. The regular City Council meeting begins at 2:00 p.m. in the Council Chambers at City Hall.
REPORTS: Copies of the reports relating to agenda items are available for review at http://www.SantaBarbaraCA.gov/CAP.In accordance with state law requirements, this agenda generally contains only a brief general description of each item of business to be transacted or discussed at the meeting. Should you wish more detailed information regarding any particular agenda item, you are encouraged to obtain a copy of the Council Agenda Report (a "CAR") online at the City's website (http://www.SantaBarbaraCA.gov/CAP). Materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are posted to the City’s website as soon as reasonably feasible.
CONSENT CALENDAR: The Consent Calendar is comprised of items that will not usually require discussion by the City Council. A Consent Calendar item is open for discussion by the City Council upon request of a Councilmember, City staff, or member of the public. Items on the Consent Calendar may be approved by a single motion. Should you wish to comment on an item listed on the Consent Agenda, after turning in your "Request to Speak" form, you should come forward to speak or raise your hand in Zoom at the time the Council considers the Consent Calendar.
LANGUAGE TRANSLATION AND INTERPRETATION: The City of Santa Barbara offers live Spanish translation and interpretation for City Council Meetings via the Wordly platform. Follow the directions below to access the service. • Go to: https://attend.wordly.ai/join/QQBV-6746
o Ensure the Session ID QQBV-6746 is displayed.
o Select “Spanish” and click on the “Attend” button.
o You can now read the captions on your device and/or listen to the translation of the City Council meeting. o Click the speaker button to hear a text-to-speech version of the translated dialogue. • If you have any questions or concerns, please contact City TV at 805-564-5311.
SPANISH INTERPRETATION: If you need interpretation of your communications to Council from Spanish into English, please contact the City Clerk’s Office at 564-5309 or by email at [email protected]. If possible, notification of at least 48 hours will usually enable the City to make arrangements.
INTERPRETACIÓN EN ESPAÑOL: Si necesita una interpretación del español al inglés, para sus comunicaciones al Consejo, comuníquese con la Oficina del Secretario Municipal al 564-5309, o por correo electrónico a [email protected]. Si es posible, la notificación de al menos 48 horas generalmente permitirá a la Ciudad hacer los arreglos.
AMERICANS WITH DISABILITIES ACT: If you need auxiliary aids or services or staff assistance to attend or participate in this meeting, please contact the City Administrator's Office at 564-5305 or by email at [email protected]. If possible, notification at least 48 hours prior to the meeting will usually enable the City to make reasonable arrangements. For those who need accessibility accommodation in using the “raise hand” function and/or registering to participate in the Zoom session, please contact the Clerk’s office by 5:00 p.m. the day before the meeting for assistance. Additionally, a speaker may email [email protected] by 5:00 p.m. the day before a meeting, stating which item they wish to speak on. Specialized services, such as sign language interpretation or documents in Braille, may require additional lead time to arrange. 11/12/2024 Santa Barbara City Council Final Agenda Page 1 NOVEMBER 12, 2024 AGENDA
REGULAR CITY COUNCIL MEETING - 2:00 P.M.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
CEREMONIAL ITEMS
1. Subject: National Law Enforcement Records and Support Services Week (120.04)
2. Subject: Employee Recognition – Service Award Pins (120.04) Recommendation: That Council authorize the City Administrator to express the City’s appreciation to employees who are eligible to receive service award pins for their years of service through November 30, 2024.
CHANGES TO THE AGENDA
CONSENT CALENDAR
3. Subject: Ordinance for the Second Amendment to The Hertz Corporation Concession Agreement at the Airport [Ordinance Adoption] (330.04) Recommendation: That Council adopt, by reading of title only, an Ordinance of the Council of the City of Santa Barbara Approving and Authorizing the Airport Director to Execute the Second Amendment to the Concession Agreement with The Hertz Corporation, Located at 500 James Fowler Road, Commencing Upon the Effective Date of the Enabling Ordinance.
4. Subject: Amending Chapter 18.40 and Repealing Section 2.12.035 of the Municipal Code Pertaining to Airport Police and Enforcement [Ordinance Introduction] (560.01)
Recommendation: That Council introduce and subsequently adopt, by reading of title only, an Ordinance of the Council of the City of Santa Barbara Amending Chapter 18.40 and Repealing Section 2.12.035 of the Municipal Code Pertaining to Airport Police and Enforcement.
11/12/2024 Santa Barbara City Council Final Agenda Page 2
5. Subject: Records Destruction for the Community Development Department [Resolution] (160.06)
Recommendation: That Council adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Relating to the Destruction of Records Held by the Community Development Department in the Housing and Human Services, and Building and Safety Office/Division.
6. Subject: Fiscal Year 2024 Fourth-Quarter Budget Adjustments [Resolution] (230.05)
Recommendation: That Council adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution 23-076, to Approve Proposed Fourth-Quarter (Q4) Adjustments to FY2024 Revenue and Expenditure Appropriations as Detailed in the Attached Schedule of Proposed Q4 Adjustments.
7. Subject: Contracts for Construction of the Laguna Stormwater Pump Station and Tide Gate Renewal Project [Resolution; Agreement] (540.06) Recommendation: That Council:
A. Award a contract with Cushman Contracting Corporation, in their low bid amount of $5,036,400 for construction of the Laguna Stormwater Pump Station and Tide Gate Renewal Project, Bid No. 3959; and authorize the Public Works Director to execute the contract and approve expenditures up to $503,640 to cover any cost increases that may result from contract change orders for extra work and differences between estimated bid quantities and actual quantities measured for payment; for a total expenditure authority of $5,540,040;
B. Authorize the Public Works Director to execute an Amendment to the agreement with DCME Inc., in the amount of $438,300 for construction management services of the Laguna Stormwater Pump Station and Tide Gate Renewal Project and authorize $43,830 for potential extra services, for a total expenditure authority of $482,130; and
C. Adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution No. 24-066, Adopting the Budget for Fiscal Year 2025, to Appropriate Funds for the Laguna Stormwater Pump Station and Tide Gate Renewal Project.
11/12/2024 Santa Barbara City Council Final Agenda Page 3
8. Subject: Authorization to Amend the Legal Services Agreement with Richards Watson & Gershon [Resolution; Agreement] (560.04) Recommendation: That Council:
A. Authorize the City Attorney to execute a third amendment to the legal services agreement with Richards Watson & Gershon, a professional corporation, relating to litigation to enforce the City’s waterline easements by increasing the agreement not to exceed amount by $190,000 (from $240,000 to $430,000), to be paid from funds appropriated to the Public Works Water Resources Division; and
B. Adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution No. 24-066, Adopting the Budget for Fiscal Year 2025, to Appropriate Funds for the Small Tunnel Air Binding Project.
9. Subject: Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement] (530.04)
Recommendation: That Council:
A. Award a contract with Lash Construction, Inc., in their low bid amount of $7,323,130 for construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project, Bid No. 5022; and authorize the Public Works Director to execute the contract and approve expenditures up to $732,313 to cover any cost increases that may result from contract change orders for extra work and differences between estimated bid quantities and actual quantities measured for payment; B. Authorize the City Administrator to execute an Amendment to the Memorandum of Understanding between the City of Santa Barbara and the Santa Barbara County Association of Governments to increase the funding from the Santa Barbara County Association of Governments by $1,280,979, for a total amount not to exceed $1,675,979 for construction of the Milpas Street at U.S. Highway 101 Operational Improvements Project; and C. Adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution No. 24-066, Adopting the Budget for Fiscal Year 2025, to Appropriate Funds for the Upper De La Vina Street and Milpas Street at Highway 101 Operational Improvements Project. 11/12/2024 Santa Barbara City Council Final Agenda Page 4
10. Subject: Approval of Banking Services Agreement [Agreement] (210.03) Recommendation: That Council approve a new Banking Services Agreement with US Bank, at an estimated net cost of $2,000 per month.
11. Subject: Grant Agreement with Summer Solstice Celebration, Inc. [Agreement] (180.02)
Recommendation: That Council authorize the City Administrator to execute a grant agreement with Summer Solstice Celebration Inc. in an amount not to exceed $64,600 for the period July 1, 2024, to June 30, 2025.
12. Subject: Contract Amendment for Construction Management Services for the Wastewater Small Diameter Closed Circuit Television Program for Fiscal Years 2023-2025 [Agreement] (540.13)
Recommendation: That Council authorize the Public Works Director to execute the First Contract Amendment with Water Systems Consulting, Inc. for construction management services for the Wastewater Small Diameter Closed Circuit Television Program for Fiscal Years 2023-2025, Contract No. 28,340, in the amount of $99,855 for a total expenditure authority of $422,117.
13. Subject: Self-Insured Workers' Compensation Program Annual Report (350.08)
Recommendation: That Council receive the annual Self-Insured Workers’ Compensation Program Annual Report for the Year Ended June 30, 2024.
14. Subject: Measure C Annual Accountability Report for Fiscal Year 2024 (260.02)
Recommendation: That Council accept the Measure C Annual Accountability Report for the Fiscal Year (FY) Ended June 30, 2024.
15. Subject: Cancellation of Certain Council Meetings in 2025 (120.09) Recommendation: That Council cancel the regular Council Meetings on the following dates: January 21, February 18, March 25, April 1, May 27, June 24, July 8, July 15, July 22, August 26, September 2, October 28, November 4, November 11, November 25, December 23, and December 30, 2025.
GENERAL PUBLIC COMMENT
PULLED CONSENT ITEMS
COUNCILMEMBER COMMITTEE ASSIGNMENT REPORTS
11/12/2024 Santa Barbara City Council Final Agenda Page 5
CITY COUNCIL ADMINISTRATIVE AND ATTORNEY REPORTS
CITY ADMINISTRATOR
16. Subject: Legislative Update to City Council (170.01) Recommendation: That Council hear a presentation related to current state legislation and the advocacy efforts of Townsend Public Affairs, Inc. on behalf of the City of Santa Barbara and provide guidance to staff and Townsend on the City’s legislative priorities for the coming year.
PUBLIC WORKS DEPARTMENT
17. Subject: Contract for the Construction of the Santa Barbara Police Station [Resolution; Agreement] (520.02)
Recommendation: That Council:
A. Award a contract to ProWest Constructors Inc., for their best value proposal of $95,998,811 for the construction of the new Santa Barbara Police Station; and authorize the Public Works Director to execute the contract and approve expenditures up to $9,600,000 that may result from contract change orders or extra scope of work that may be required; and B. Adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Authorizing the Finance Director and Risk Manager to Acquire and Execute Policies of Insurance and Other Agreements Necessary to Implement an Owner-Controlled Insurance Program for the New Police Station Construction Project.
CITY ADMINISTRATOR
18. Subject: Presentation on the Findings and Recommendations from the Housing Crisis Ad Hoc Committee (170.01)
Recommendation: That Council:
A. Receive a presentation on behalf of the Housing Crisis Ad Hoc Committee regarding its key findings and recommendations; and
B. Advise staff on priorities and give direction for further research and exploration.
11/12/2024 Santa Barbara City Council Final Agenda Page 6
COUNCIL AND STAFF COMMUNICATIONS
COUNCILMEMBER ENGAGEMENTS
PUBLIC COMMENT (IF NECESSARY)
ADJOURNMENT
Agenda Item No. 1
File Code No. 120.04
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: City Administrator’s Office
SUBJECT: Employee Recognition – Service Award Pins
RECOMMENDATION:
That Council authorize the City Administrator to express the City’s appreciation to employees who are eligible to receive service award pins for their years of service through November 30, 2024.
DISCUSSION:
The City appreciates the loyalty to the community and the dedication to public service that are demonstrated by City employees throughout the organization every day. Since 1980, the City Employees’ Recognition Program has recognized length of City Service. Service award pins are presented to employees for every five years of service. Those employees achieving 25 years of service or more are eligible to receive their pins in front of the City Council.
Attached is a list of those employees who will be awarded pins for their service through November 30, 2024.
ATTACHMENT: November 2024 Service Awards
PREPARED BY: Talhia Dorado, Administrative Specialist
SUBMITTED BY: Kelly McAdoo, City Administrator
APPROVED BY: City Administrator's Office
Agenda Item No. 2
File Code No. 120.04
ATTACHMENT
NOVEMBER 2024 SERVICE AWARDS
November 12, 2024 Council Meeting
5 Years
Michael Rubin, Building and Safety Supervisor, Community Development Department Ryan Cullom, Senior Airport Operations Spec, Airport Department 10 Years
Steven Cornejo, Streets Maintenance Worker II, Public Works Department 20 Years
Christie Lanning, Senior Human Resources Analyst, Human Resources Department 25 Years
Samuel Blackwell, Building Inspector, Community Development Department ORDINANCE NO.____________
AN ORDINANCE OF THE COUNCIL OF THE CITY OF SANTA
BARBARA APPROVING AND AUTHORIZING THE AIRPORT
DIRECTOR TO EXECUTE THE SECOND AMENDMENT TO THE
CONCESSION AGREEMENT WITH THE HERTZ
CORPORATION, LOCATED AT 500 JAMES FOWLER ROAD,
COMMENCING UPON THE EFFECTIVE DATE OF THE
ENABLING ORDINANCE
THE COUNCIL OF THE CITY OF SANTA BARBARA DOES ORDAIN AS FOLLOWS:
SECTION 1. In accordance with the provisions of Section 521 of the Charter of the City of Santa Barbara, an Ordinance of the Council of the City of Santa Barbara approving and authorizing execution of the Second Amendment to the Concession Agreement with The Hertz Corporation, located at 500 James Fowler Road, commencing upon the effective date of the enabling ordinance, a copy of which is on file with the City Clerk, is hereby approved.
Agenda Item No. 3
File Code No. 330.04
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: City Attorney’s Office
Santa Barbara Police Department
SUBJECT: Amending Chapter 18.40 and Repealing Section 2.12.035 of the Municipal Code Pertaining to Airport Police and Enforcement [Ordinance Introduction]
RECOMMENDATION:
That Council introduce and subsequently adopt, by reading of title only, an Ordinance of the Council of the City of Santa Barbara Amending Chapter 18.40 and Repealing Section
2.12.035 of the Municipal Code Pertaining to Airport Police and Enforcement.
DISCUSSION:
Background
The Santa Barbara Airport Police serve as the Law Enforcement Division of the Airport Department for the City of Santa Barbara. The Airport Police originally began as a security unit and has evolved into a specialized law enforcement organization in response to emerging threats to civil aviation.
Airport Police Officers are sworn Peace Officers under California Penal Code § 830.33(d) and are required under Federal Aviation Standards to have the power to arrest and provide armed law enforcement services at the Santa Barbara Municipal Airport. Pursuant to Title 49 of the Code of Federal Regulations (CFR) 1542.215, the Santa Barbara Airport is required to provide uniformed law enforcement personnel in the number and manner necessary to support its Airport Security Program and Federal Transportation Security screening operations. Those Law Enforcement Officers must be available and committed to respond to any incident in support of a civil aviation security program or commercial air carrier program.
On September 30, 2021, Senate Bill 2 (SB 2) was signed into law with most provisions of the Bill taking effect on January 1, 2022. This Bill significantly impacted law enforcement agencies across the state creating a more centralized and regulated state oversight over peace officers as well as increasing the accountability for misconduct under the purview Agenda Item No. 4
File Code No. 560.01
Council Agenda Report
Amending Chapter 18.40 and Repealing Section 2.12.035 of the Municipal Code Pertaining to Airport Police and Enforcement [Ordinance Introduction] November 12, 2024
of the state agency of the Commission of Peace Officer Standards and Training (“POST”).
Part of those regulations include a requirement that all Peace Officers classified under the California Penal Code hold a current and valid POST “Basic” certificate (graduation from a police academy plus completion of a Field Training Program). In essence, the same legal obligations required by SB2 of officers of the Santa Barbara Police Department are also now required of Santa Barbara Airport Police Officers.
Therefore, because Airport Police’s designation of its officers under the California Penal Code mandates that Airport Police follow all the requirements of SB2, the City determined that best practices dictate that Airport Police become a POST member agency similar to the Santa Barbara Police Department .
Changes to the Ordinance
The proposed Ordinance makes the following changes to internal operations:
Authorizes Airport Police to be under the Supervision of the Police Chief. Designates Airport Police Officers as Peace Officers under Section 830.33(d) of the California Penal Code. Previously, such designation was contained in the Treatment and Patrol (TAP) Memorandum of Understanding. Authorizes Airport Police Officers to carry firearms as a condition of their employment.
Provides that Airport Police are a member agency of POST and required to adhered to their general standards; therefore, necessitating the strikethrough of Santa Barbara Municipal Code (SBMC) Section 2.12.035 since that provides that Airport Police are a participating agency.
Contains an update of the proper authority (California Penal Code Section 836.5) for non-Airport Police Officers to issue citations. (Ex. Airport traffic aides to issue parking citations).
These changes to the Ordinance allow Airport Police to receive supervision from the Santa Barbara Police Chief. To be clear, this change does not mean Airport Police can operate in other parts of the City (with exceptions to pursuits or exigent circumstances).
The reason for that is that their 830.33 (d) Penal Code designation limits their jurisdiction only to airport grounds/territory.
These changes will also allow the SBPD to provide additional resources to Airport Police that have not occurred in the past. SBPD has had a sergeant at Airport Police assisting them with updating policies and procedures, becoming a POST member agency, and having an approved Field Training Program. A SBPD sergeant will continue to be assigned to Airport Police. Airport Police will now benefit from SBPD training, improved reporting, bodycams, SBPD conducting internal investigations as well as use of force investigations, improved dispatching, POST mandatory reporting, updating certifications, Council Agenda Report
Amending Chapter 18.40 and Repealing Section 2.12.035 of the Municipal Code Pertaining to Airport Police and Enforcement [Ordinance Introduction] November 12, 2024
and an overall better coordination of City resources. This will have a significant positive impact for Airport Police as it will have the administrative support of SBPD.
This Ordinance unanimously passed at the Ordinance Committee meeting on October 29, 2024.
FINANCIAL IMPACT:
There is no known fiscal impact associated with the amendments to this Ordinance.
ENVIRONMENTAL CONSIDERATIONS:
The action being considered by the City Council is exempt from the California Environmental Quality Act (CEQA) because it is not a “project” under Section 15061(b)(3) of CEQA Guidelines. The action involves an organizational or administrative activity of government that will not result in the direct or indirect physical change in the environment.
PREPARED BY: John Doimas, Assistant City Attorney
Heather Minter, Deputy City Attorney
SUBMITTED BY: Sarah J. Knecht, City Attorney
APPROVED BY: Kelly McAdoo, City Administrator
COUNCIL INTRODUCTION DRAFT
SHOWING CHANGES FROM
CURRENT CODE 11/12/24
1 AN ORDINANCE OF THE COUNCIL OF THE
CITY OF SANTA BARBARA AMENDING
CHAPTER 18.40 AND REPEALING
SECTION 2.12.035 OF THE MUNICIPAL
CODE PERTAINING TO AIRPORT POLICE
AND ENFORCEMENT
THE CITY COUNCIL OF THE CITY OF SANTA BARBARA DOES ORDAIN AS FOLLOWS:
SECTION 1: Chapter 18.40 of Title 18 of the Santa Barbara Municipal Code is amended to read as follows:
18.40.010. Airport Police Under the Supervision of the Chief of Police.
Notwithstanding Section 2.12.030 of this Code, the Santa Barbara Chief of Police shall be responsible for all employment matters of the Santa Barbara Airport Police Department and shall have the authority to act to safeguard the public on all Airport property.
18.40.010 Powers of Airport Director.
The Airport Director shall be responsible for the enforcement of the provisions of this title.
18.40.015. Airport Police Designation.
The Santa Barbara Airport Police are peace officers as provided for under Section 830.33(d) of the California Penal Code and shall have the authority to perform the duties authorized under that code section.
18.40.016. Airport Police Department: Commission on Peace Officer Standards and Training (P.O.S.T.) Member Agency.
The Santa Barbara Airport Police Department is a member agency of the Commission on Peace Officer Standards and Training (P.O.S.T.) and adheres to the
COUNCIL INTRODUCTION DRAFT
SHOWING CHANGES FROM
CURRENT CODE 11/12/24
2 standards for recruitment, training, and qualifications established by the Commission.
18.40.020. Issuance of Citations.
The Airport Director shall designate in writing the classification or job title of airport employees designated to exercise citation authority pursuant to Section 836.5 of the California Penal Code.
18.40.020. Issuance of Citations.
The Airport Director, and those employees of the Airport Department charged by the Airport Director with enforcement duties, are authorized to issue written notices to appear as provided in Chapter 1.20 of this code, of Section 853.6 of the California Penal Code, and to issue notices of illegal parking as provided in Section 40202 of the California Vehicle Code.
18.40.030. Carrying Firearms.
The Airport Police, as a condition of their employment, are authorized to carry firearms. The training, use, and handling of firearms shall comply with all Departmental policies, rules, and regulations.
18.40.030. Carrying Firearms.
The Patrol Supervisor and Airport Patrol Officers may carry firearms while engaged in the performance of their duties. Prior to carrying firearms, the Patrol Supervisor and all Airport Patrol Officers must satisfactorily complete a course of training in the carrying and use of firearms which meets the minimum standards prescribed by the Commission on Peace Officers Standards and Training. The purpose and intent of the authorization to carry firearms provided in this section is to provide a means of self-defense or defense of others. The use and handling of such weapons shall comply in all respects with all applicable policies, rules and regulations.
18.40.040. Penalty.
The violation of any provision of this title is a misdemeanor and upon conviction
COUNCIL INTRODUCTION DRAFT
SHOWING CHANGES FROM
CURRENT CODE 11/12/24
3 thereof shall be punishable by a fine not to exceed the sum of $1,000.00, or by imprisonment for a period not exceeding six months, or by both such fine and imprisonment.
SECTION 2. Section 2.12.035 of Chapter 2.12 of Title 2 of the Santa Barbara Municipal Code is repealed:
2.12.035 Airport Patrol: Peace Officer Standards and Training (P.O.S.T.) Participation.
The City of Santa Barbara declares that it desires to qualify to receive aid from the State of California under the provisions of Section 13522, Chapter 1 of Title 4, Part 4 of the California Penal Code.
Pursuant to Sections 13510 and 13512 of said Chapter 1, the Santa Barbara Airport Patrol will adhere to the standards for recruitment and training established by the Commission on Peace Officer Standards and Training.
The Commission and its representatives may make such inquiries as deemed necessary to ascertain that the peace officer personnel of the Santa Barbara Airport Patrol adhere to the standards for recruitment and training established by the California Commission on Peace Officer Standards and Training.
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Community Development Department
SUBJECT: Records Destruction for the Community Development Department [Resolution]
RECOMMENDATION:
That Council adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Relating to the Destruction of Records Held by the Community Development Department in the Housing and Human Services, and Building and Safety Office/Division.
DISCUSSION:
City Council adopted Resolution No. 16-005 on February 9, 2016, approving the City of Santa Barbara Records Management Policies and Procedures Manual. The Manual contains the records retention and disposition schedules for all City departments. The schedules are a comprehensive listing of records created or maintained by the City, the length of time each record should be retained, and the legal retention authority. If no legal retention authority is cited, the retention period is based on standard records management practice.
Pursuant to the manual, the Community Development (CD) Director submitted a request for records destruction to the City Clerk Services Manager to obtain written consent from the City Attorney. The City Clerk Services Manager agreed that the list of records proposed for destruction conforms to the retention and disposition schedules. The City Attorney has consented in writing to the destruction of the proposed records.
The CD Director requests that City Council approve the destruction of the Community Development Department records in the Housing and Human Services and Building and Safety Divisions listed on Exhibit A of the proposed resolution, without retaining a copy.
Agenda Item No. 5
File Code No. 160.06
Council Agenda Report
Records Destruction for the Community Development Department [Resolution] November 12, 2024
BUDGET/FINANCIAL IMPACT:
This action does not have a budget/financial impact on the City.
SUSTAINABILITY IMPACT:
Under the City’s sustainability program, one of its goals is to increase recycling efforts and divert waste from landfills. The Citywide Records Management Program outlines that records approved for destruction be recycled, reducing paper waste.
PREPARED BY: Greta Walters, Administrative Assistant
SUBMITTED BY: Elias Isaacson, Community Development Director APPROVED BY: Kelly McAdoo, City Administrator
1 RESOLUTION NO.
A RESOLUTION OF THE COUNCIL OF THE CITY OF
SANTA BARBARA RELATING TO THE DESTRUCTION OF
RECORDS HELD BY THE COMMUNITY DEVELOPMENT
DEPARTMENT IN THE HOUSING AND HUMAN SERVICES,
AND BUILDING AND SAFETY OFFICE/DIVISION
WHEREAS, the City Council adopted Resolution No. 16-005 on February 9, 2016, approving the City of Santa Barbara Records Management Policies and Procedures Manual;
WHEREAS, the City of Santa Barbara Records Management Policies and Procedures Manual contains the records retention and disposition schedules for all City departments.
The records retention and disposition schedules are a comprehensive listing of records created or maintained by the City, the length of time each record should be retained, and the legal retention authority. If no legal retention authority is cited, the retention period is based on standard records management practice;
WHEREAS, Government Code section 34090 provides that, with the approval of the City Council and the written consent of the City Attorney, the head of a City department may destroy certain city records, documents, instruments, books or papers under the Department Head’s charge, without making a copy, if the records are no longer needed; WHEREAS, the Community Development Director submitted a request for the destruction of records held by the Community Development Department to the City Clerk Services Manager to obtain written consent from the City Attorney. A list of the records, documents, instruments, books or papers proposed for destruction is attached hereto as Exhibit A and shall hereafter be referred to collectively as the “Records”; WHEREAS, the Records do not include any records affecting title to real property or liens upon real property, court records, records required to be kept by statute, records less than two years old, video or audio recordings that are evidence in any claim or pending litigation, or the minutes, ordinances or resolutions of the City Council or any City board or commission;
WHEREAS, the City Clerk Services Manager agrees that the proposed destruction conforms to the City’s retention and disposition schedules; WHEREAS, the City Attorney consents to the destruction of the Records; and WHEREAS, the City Council of the City of Santa Barbara finds and determines that the Records are no longer required and may be destroyed.
2 NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SANTA BARBARA that the Community Development Director, or his designated representative, is authorized and directed to destroy the Records without retaining a copy.
EXHIBIT A
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING AND SAFETY
Records Series Dates
Administrative Subject/Correspondence Files 2015–2022
Cashier Journal Summary Reports 2015–March 2023
Monthly Report of Building Statistics 2010–September 2017
HOUSING AND HUMAN SERVICES
Records Series Dates
Human Services Project Files, Fiscal Years 2010–2013 July 1, 2009–June 30, 2013 Community Development Block Grant Files, Fiscal
Years 2007–2012 July 1, 2006–June 30, 2012
Integrated Disbursement and Information System (IDIS) Logs for CDBG Grants, Fiscal Years 2012–2014 July 1, 2011–June 30, 2014 HOME Fund Administrative Files (IDIS Logs), Fiscal
Years 2012–2014 July 1, 2011–June 30, 2014
Record Series Dates
Affordable Housing Files, Home Repair Loan Program (HRLP) 2009 and 2010 Loans Denied
Affordable Housing Files, HRLP Loans Withdrawn Various, 2006–2014 Affordable Housing Files, HRLP Loans Paid Off Various, 1984–2014
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Finance Department
SUBJECT: Fiscal Year 2024 Fourth-Quarter Budget Adjustments [Resolution] RECOMMENDATION:
That Council adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution 23-076, to Approve Proposed Fourth-Quarter (Q4) Adjustments to FY2024 Revenue and Expenditure Appropriations as Detailed in the Attached Schedule of Proposed Q4 Adjustments.
DISCUSSION:
As a required step when preparing the Fiscal Year (FY) 2024 Annual Comprehensive Financial Report (ACFR), the auditor works with staff to ensure revenue and expenditure budget appropriations are reported consistently. Staff is requesting minor appropriation adjustments to ensure fair and accurate representation in the City’s ACFR for FY2024.
BUDGET/FINANCIAL IMPACT:
The Q4 budget adjustments, as proposed, will change revenue and expenditure appropriations in the General Fund and other funds as itemized in the attached Schedule of Proposed Q4 Adjustments. These budget adjustments have no significant budget impacts as they are reconciling items in preparation for the year-end reporting. No additional revenue or expenditure transactions will occur in FY2024.
ATTACHMENT: Schedule of Proposed Fourth Quarter Adjustments PREPARED BY: Nathalie Lecolley, Controller
SUBMITTED BY: Keith DeMartini, Finance Director
APPROVED BY: Kelly McAdoo, City Administrator
Agenda Item No. 6
File Code No. 230.05
Increase
Increase (Decrease) in Addition to
(Decrease) in Estimated (Use of)
Appropriations Revenues Reserves
GENERAL FUND (1000)
Move Unfunded Liability Pension appropriations that belonged in the General Fund from the Police-Supplemental Law Enforcement (SLESF) Fund.
$ 54,586.55 $ - $ (54,586.55)
Reduce appropriations for capital outlay transfer-out to the Measure C Capital Fund by $698,211.15 to align the transfer amount to match the final Measure C Tax Revenue for FY24. $ (698,211.15) $ - $ 698,211.15
Total General Fund (1000) $ (643,624.60) $ - $ 643,624.60
SPECIAL REVENUE FUNDS
Police-Suppl Law Enf (SLESF) Fund (2320)
Move Unfunded Liability Pension appropriations that belonged in the General Fund from the Police-Supplemental Law Enforcement (SLESF) Fund.
$ (54,586.55) $ - $ 54,586.55
Total Police-Suppl Law Enf (SLESF) Fund (2320) $ (54,586.55) $ - $ 54,586.55 Measure C Capital Fund (3010)
Reduce estimated revenue for transfer-in from the General Fund to align the transfer amount to match the final Measure C Tax Revenue for FY24.
$ - $ (698,211.15) $ (698,211.15)
Total Measure C Capital Fund (3010) $ - $ (698,211.15) $ (698,211.15)
ENTERPRISE FUNDS
Water Capital Fund (5010)
Modify a FY25 budget amendment that appropriated $170,000 for a second amendment for legal services agreement with Richards Watson & Gerson for litigation to enforce the City's waterline easements. The modification needed will appropriate $61,252.03 of this amount in FY24 for services provided in FY24, leaving the remainder of $108,747.97 appropriated for FY25.
$ 61,252.03 $ - $ (61,252.03)
Total Water Capital Fund (5010) $ 61,252.03 $ - $ (61,252.03) Grand Total: $ (636,959.12) $ (698,211.15) $ (61,252.03) City of Santa Barbara
Fiscal Year 2024 Financials
Schedule of Proposed Fourth Quarter Budget Adjustments
ATTACHMENT
RESOLUTION NO.
A RESOLUTION OF THE COUNCIL OF THE CITY OF SANTA
BARBARA AMENDING RESOLUTION 23-076, TO APPROVE
PROPOSED FOURTH-QUARTER (Q4) ADJUSTMENTS TO
FY2024 REVENUE AND EXPENDITURE APPROPRIATIONS
AS DETAILED IN THE ATTACHED SCHEDULE OF
PROPOSED Q4 ADJUSTMENTS
WHEREAS, in accordance with the City Charter, the City Administrator filed with the City Council a proposed budget for the fiscal year beginning July 1, 2024; WHEREAS, the City Council is required to adopt a budget before the beginning of the fiscal year on July 1, 2024;
WHEREAS, the City Charter provides that at any public meeting after the adoption of the budget, the City Council may amend or supplement the budget by motion adopted by the affirmative votes of at least a majority of the total members of the City Council; and WHEREAS, as authorized by Resolution No. 23-076, this Resolution approves the amendment to the budget as provided herein.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SANTA BARBARA THAT in accordance with the provisions of Section 1205 of the City Charter, the budget for the Fiscal Year (FY) 2024, as adopted by Resolution No. 23-076, is hereby amended as itemized in the Proposed Fourth-Quarter (Q4) Adjustments to FY2024 revenue and expenditure appropriations as detailed in the attached Schedule of Proposed Q4 Adjustments (Exhibit A).
Increase
Increase (Decrease) in Addition to
(Decrease) in Estimated (Use of)
Appropriations Revenues Reserves
GENERAL FUND (1000)
Move Unfunded Liability Pension appropriations that belonged in the General Fund from the Police-Supplemental Law Enforcement (SLESF) Fund.
$ 54,586.55 $ - $ (54,586.55)
Reduce appropriations for capital outlay transfer-out to the Measure C Capital Fund by $698,211.15 to align the transfer amount to match the final Measure C Tax Revenue for FY24. $ (698,211.15) $ - $ 698,211.15
Total General Fund (1000) $ (643,624.60) $ - $ 643,624.60
SPECIAL REVENUE FUNDS
Police-Suppl Law Enf (SLESF) Fund (2320)
Move Unfunded Liability Pension appropriations that belonged in the General Fund from the Police-Supplemental Law Enforcement (SLESF) Fund.
$ (54,586.55) $ - $ 54,586.55
Total Police-Suppl Law Enf (SLESF) Fund (2320) $ (54,586.55) $ - $ 54,586.55 Measure C Capital Fund (3010)
Reduce estimated revenue for transfer-in from the General Fund to align the transfer amount to match the final Measure C Tax Revenue for FY24.
$ - $ (698,211.15) $ (698,211.15)
Total Measure C Capital Fund (3010) $ - $ (698,211.15) $ (698,211.15)
ENTERPRISE FUNDS
Water Capital Fund (5010)
Modify a FY25 budget amendment that appropriated $170,000 for a second amendment for legal services agreement with Richards Watson & Gerson for litigation to enforce the City's waterline easements. The modification needed will appropriate $61,252.03 of this amount in FY24 for services provided in FY24, leaving the remainder of $108,747.97 appropriated for FY25.
$ 61,252.03 $ - $ (61,252.03)
Total Water Capital Fund (5010) $ 61,252.03 $ - $ (61,252.03) Grand Total: $ (636,959.12) $ (698,211.15) $ (61,252.03) City of Santa Barbara
Fiscal Year 2024 Financials
Schedule of Proposed Fourth Quarter Budget Adjustments
EXHIBIT A
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Public Works Department
SUBJECT: Contracts for Construction of the Laguna Stormwater Pump Station and Tide Gate Renewal Project [Resolution; Agreement]
RECOMMENDATION: That Council:
A. Award a contract with Cushman Contracting Corporation, in their low bid amount of $5,036,400 for construction of the Laguna Stormwater Pump Station and Tide Gate Renewal Project, Bid No. 3959; and authorize the Public Works Director to execute the contract and approve expenditures up to $503,640 to cover any cost increases that may result from contract change orders for extra work and differences between estimated bid quantities and actual quantities measured for payment; for a total expenditure authority of $5,540,040; B. Authorize the Public Works Director to execute an Amendment to the agreement with DCME Inc., in the amount of $438,300 for construction management services of the Laguna Stormwater Pump Station and Tide Gate Renewal Project and authorize $43,830 for potential extra services, for a total expenditure authority of $482,130; and
C. Adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution No. 24-066, Adopting the Budget for Fiscal Year 2025, to Appropriate Funds for the Laguna Stormwater Pump Station and Tide Gate Renewal Project.
DISCUSSION:
Project Description
The Laguna Stormwater Pump Station and Tide Gate Renewal Project (Project) will rehabilitate the Laguna Channel Stormwater Pump Station (Pump Station) and improve the surrounding drainage features as part of the larger Laguna Channel Stormwater Pump Station Facility (Facility). The Facility is located on the ocean side of Cabrillo Boulevard at 236 East Cabrillo Boulevard near the Laguna Channel terminus. It is a critical City infrastructure project that minimizes the impact of flooding in the low-lying neighborhoods between Laguna Street and Milpas Street.
Agenda Item No. 7
File Code No. 540.06
Council Agenda Report
Contracts for Construction of the Laguna Pump Station and Tide Gate Renewal Project [Resolution; Agreement]
November 12, 2024
The Project will improve the resiliency and efficiency of the Pump Station and extend its useful life. The scope of the Project includes the electric motor driver conversion of the pumps, installation of new electrical distribution equipment, installation of an emergency standby diesel generator, concrete repairs to the Pump Station wetwell, repairs to the Laguna Channel grouted channel lining, cleaning of the tidal slide gates, and the fabrication and installation of hinged barriers on the tidal gate weirs.
Contract Bids
A total of two bids were received for the subject work, ranging as follows:
BIDDER BID AMOUNT
1. Cushman Contracting Corporation
Goleta, CA 93116
$5,036,400
2. Filanc Construction Company
Escondido, CA 92029
$5,355,161
The low bid of $5,036,400, submitted by Cushman Contracting Corporation (Cushman), is an acceptable bid that is responsive to and meets the requirements of the bid specifications.
The change order funding recommendation of $503,640, or ten percent, is typical for this type of work and size of project.
Construction Phase Contract Services
Staff recommends that Council authorize the Public Works Director to execute a contract amendment with DCME Inc. (DCME) in the amount of $438,300 for construction management services and authorize $43,830 for potential extra services, for a total expenditure authority of $482,130. DCME is experienced in this type of work and was selected through a competitive Request for Proposals process.
Community Outreach
The new variable speed motors that will drive the existing pumps must be purchased by the contractor and the procurement process is anticipated to take approximately 18 months. This will be followed by approximately 4 months of construction inside the Facility. Construction will not interrupt public beach access. Minimal parking will be impacted at the Palm Park Parking Lot, between the Pump Station and the Skate Park on East Cabrillo Boulevard. Sandwich boards will be used to notify the public, and Project Updates will be published in the City News in Brief.
Council Agenda Report
Contracts for Construction of the Laguna Pump Station and Tide Gate Renewal Project [Resolution; Agreement]
November 12, 2024
BUDGET/FINANCIAL INFORMATION:
The Project is partially funded by a FEMA HMGP grant, which covers 75 percent of the Project costs, up to $2,504,565. The remaining costs are City match funds covered by Measure C and Measure A reserves.
The following summarizes all Project design costs, construction contract funding, and other Project costs:
ESTIMATED TOTAL PROJECT COST
*Cents have been rounded to the nearest dollar in this table.
FEMA
GRANT
CITY
SHARE
TOTAL
City Design Cost $286,712 $95,571 $382,283
Consultant Design Costs $467,077 $155,693 $622,770
Design Subtotal $753,789 $251,264 $1,005,053
Construction Contract $2,504,565 $2,531,835 $5,036,400
Construction Change Order Allowance $0 $503,640 $503,640 Subtotal $2,504,565 $3,035,475 $5,540,040
Construction Management/Inspection
(DCME, Inc.)
$0 $438,300 $438,300
Construction Management (City Staff) $0 $235,079 $235,079 Design Support during Construction
(Stantec, Inc.)*
$0 $273,826 $273,826
Subtotal $0 $947,205 $947,205
Construction Subtotal $2,504,565 $3,982,680 $6,487,245
TOTAL PROJECT COST $3,258,354 $4,233,944 $7,492,298
*Contract previously authorized and encumbered
Construction of the Project is adequately funded with existing FEMA HMGP grant funds ($1,107,526), the acceptance of additional FEMA HMGP grant funds ($1,397,039.19), existing unencumbered Measure C expenditure appropriations ($1,505,368), and the appropriation of Measure A reserve funds ($2,203,486). With the proposed actions, there will be sufficient expenditure appropriations to fund the proposed contracts, including extra services. The attached budget resolution executes these needed appropriations.
A copy of the contract may be requested from the Public Works Department for public review by contacting [email protected].
Council Agenda Report
Contracts for Construction of the Laguna Pump Station and Tide Gate Renewal Project [Resolution; Agreement]
November 12, 2024
ENVIRONMENTAL REVIEW:
The Project was determined to be exempt under California Environmental Quality Act (CEQA) Section 15301 (b) Existing Facilities for the repair or minor alteration of existing public structures, or topographical features, involving negligible or no expansion of use.
The project proposed limited repairs and maintenance of the existing Laguna Pump Station Facility and associated Tide Gate structure. The project includes repair and maintenance of this existing City flood control facility located on the Laguna Channel. In addition, standard avoidance and minimization measures will be implemented during construction to minimize any potential adverse impacts on environmental resources. The Notice of Exemption was filed on September 9, 2021, and the State Clearinghouse number is SCH 2022060331.
ATTACHMENT: Project Location Map
PREPARED BY: Brian D’Amour, P.E., City Engineer/LY/MR/sk SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator
PROJECT LOCATION MAP
Laguna Channel Stormwater Pump Station and Tide Gates
City of Santa Barbara
ATTACHMENT
RESOLUTION NO.
A RESOLUTION OF THE COUNCIL OF THE CITY OF
SANTA BARBARA AMENDING RESOLUTION NO. 24-066,
ADOPTING THE BUDGET FOR FISCAL YEAR 2025, TO
APPROPRIATE FUNDS FOR THE LAGUNA
STORMWATER PUMP STATION AND TIDE GATE
RENEWAL PROJECT.
WHEREAS, in accordance with the City Charter, the City Administrator filed with the Council a proposed budget for the fiscal year beginning July 1, 2024; WHEREAS, the City Council is required to adopt a budget before the beginning of the fiscal year on July 1, 2024;
WHEREAS, the City Charter provides that at any public meeting after the adoption of the budget, the City Council may amend or supplement the budget by motion adopted by the affirmative votes of at least a majority of the total members of the City Council; and WHEREAS, as authorized by Resolution No. 24-066, this Resolution approves the amendment to the budget as provided herein.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SANTA BARBARA THAT in accordance with the provisions of Section 1205 of the City Charter, the budget for the Fiscal Year 2025, as adopted by Resolution No. 24-066, is hereby amended as follows:
SECTION 1. The Council accepts a Federal Emergency Management Agency Hazard Mitigation Grant Program grant in the amount of $1,397,039.19 for the Laguna Stormwater Pump Station and Tide Gate Renewal Project.
SECTION 2. The Council approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the Fiscal Year 2025 in the amount of $1,397,039.19, funded by Federal Emergency Management Agency Hazard Mitigation Grant Program grant funds, for the Laguna Stormwater Pump Station and Tide Gate Renewal Project.
SECTION 3. The Council approves the allocation of available expenditure appropriations in the Laguna Pump Station Project in the Measure C Capital Fund in the amount of $1,505,368, authorizes the transfer of such funds to the Streets Grant Capital Fund, and approves an increase in revenue and expenditure appropriations in the Streets Grant Capital fund in Fiscal Year 2025 in the amount of $1,505,368, funded by the transfer, for the proposed contract, including extra services, with Cushman Contracting Corporation for the construction of the Laguna Stormwater Pump Station and Tide Gate Renewal Project.
SECTION 4. The Council approves an increase in expenditure appropriations in the Measure A Operating Fund in the amount of $2,203,486 funded by available reserves in that fund, authorizes the transfer of such funds to the Streets Grant Capital Fund, and approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in Fiscal Year 2025 in the amount of $2,203,486, funded by the transfer, for the proposed Laguna Stormwater Pump Station and Tide Gate Renewal Project.
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: City Attorney’s Office
SUBJECT: Authorization to Amend the Legal Services Agreement with Richards Watson & Gershon [Resolution; Agreement]
RECOMMENDATION: That Council:
A. Authorize the City Attorney to execute a third amendment to the legal services agreement with Richards Watson & Gershon, a professional corporation, relating to litigation to enforce the City’s waterline easements by increasing the agreement not to exceed amount by $190,000 (from $240,000 to $430,000), to be paid from funds appropriated to the Public Works Water Resources Division; and B. Adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution No. 24-066, Adopting the Budget for Fiscal Year 2025, to Appropriate Funds for the Small Tunnel Air Binding Project.
DISCUSSION:
In September 2022, the City entered into an agreement with Richards Watson & Gershon for legal advice and representation with respect to litigation to enforce the City’s waterline easements. Expenditures on the contract are anticipated to exceed the current contract amount of $240,000 due to the protracted litigation. Increasing the contract amount by an additional $190,000 is necessary due to the litigation costs and to avoid an interruption of legal services.
BUDGETARY IMPACTS:
The cost for legal support and related costs for this case will be paid by appropriating $190,000 of reserve funds that exist in the Water Capital Fund in Fiscal Year 2025.
PREPARED AND
SUBMITTED BY: Sarah J. Knecht, City Attorney
Clifford Maurer, Public Works Director
Joshuan Haggmark, Water Resources Manager
APPROVED BY: Kelly McAdoo, City Administrator
Agenda Item No. 8
File Code No. 560.04
RESOLUTION NO.
A RESOLUTION OF THE COUNCIL OF THE CITY OF
SANTA BARBARA AMENDING RESOLUTION NO. 24-066,
ADOPTING THE BUDGET FOR FISCAL YEAR 2025, TO
APPROPRIATE FUNDS FOR THE SMALL TUNNEL AIR
BINDING PROJECT
WHEREAS, in accordance with the City Charter, the City Administrator filed with the Council a proposed budget for the fiscal year beginning July 1, 2024; and WHEREAS, the City Council is required to adopt a budget before the beginning of the fiscal year on July 1, 2024; and
WHEREAS, the City Charter provides that at any public meeting after the adoption of the budget, the City Council may amend or supplement the budget by motion adopted by the affirmative votes of at least a majority of the total members of the City Council; and WHEREAS, as authorized by Resolution No. 24-066, this Resolution approves the amendment to the budget as provided herein.
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SANTA BARBARA THAT:
In accordance with the provisions of Section 1205 of the City Charter, the budget for the Fiscal Year 2025, as adopted by Resolution No. 24-066, is hereby amended as follows:
The Council approves of appropriating available reserve funds that exist in the Water Capital Fund in the amount of $190,000 in order to fund the outside counsel contract with Richards Watson Gershon regarding litigation involving City easement work on the Small Tunnel Air Binding project.
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Downtown Team and Engineering Divisions, Public Works Department SUBJECT: Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement]
RECOMMENDATION: That Council:
A. Award a contract with Lash Construction, Inc., in their low bid amount of $7,323,130 for construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project, Bid No. 5022; and authorize the Public Works Director to execute the contract and approve expenditures up to $732,313 to cover any cost increases that may result from contract change orders for extra work and differences between estimated bid quantities and actual quantities measured for payment;
B. Authorize the City Administrator to execute an Amendment to the Memorandum of Understanding between the City of Santa Barbara and the Santa Barbara County Association of Governments to increase the funding from the Santa Barbara County Association of Governments by $1,280,979, for a total amount not to exceed $1,675,979 for construction of the Milpas Street at U.S. Highway 101 Operational Improvements Project; and
C. Adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Amending Resolution No. 24-066, Adopting the Budget for Fiscal Year 2025, to Appropriate Funds for the Upper De La Vina Street and Milpas Street at Highway 101 Operational Improvements Project.
EXECUTIVE SUMMARY:
The recommended construction contract combines eight separate projects to minimize construction impacts to the community, increase City of Santa Barbara (City) staff efficiency, and realize economies of scale in construction. The result is one overall project called the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project (Project). This Project is critical to traffic safety for all road users, with a specific focus on our roads’ most vulnerable users – pedestrians and cyclists. The Project also includes a Agenda Item No. 9
File Code No. 530.04
Council Agenda Report
Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement] November 12, 2024
water main replacement critical to health and safety of our residents. The individual projects listed below were planned and designed as eight separate projects with different funding sources.
Upper De La Vina Street Gap Closure and Safe Crossings Project Highway Safety Improvement Program (HSIP) Project at De La Vina Street and Los Olivos Street
HSIP Project at De La Vina Street and Pedregosa Street HSIP Project at De La Vina Street and Valerio Street
Intersection Safety Improvement Project at De La Vina Street and Islay Street De La Vina Water Main Replacement Project
Milpas Street at U.S. Highway 101 Operational Improvements Project Moffett Place Crosswalk Project
The Project received three construction bids, with Lash Construction, Inc. being the lowest responsive bidder. A budget adjustment is required to update the Fiscal Year 2025 Budget and an amendment to the Memorandum of Understanding (MOU) between the City and the Santa Barbara County Association of Governments (SBCAG) for construction of the work along Milpas Street between Highway 101 and Hutash Street is required. Construction is anticipated to take approximately 15 months.
DISCUSSION:
Background
De La Vina Street is a high priority corridor for collision reduction as part of the Council adopted Vision Zero Strategy for eliminating serious and fatal injuries caused by traffic collisions. De La Vina Street was identified due to the frequency of pedestrian involved collisions. As a corridor, De La Vina Street ranks high for the most bike and pedestrian collisions (combined) in the City. The City has been successful in obtaining grants along this corridor over the past several years, with recent construction of the Downtown De La Vina Street Safe Crosswalks and Buffered Bike Lanes Project, Downtown De La Vina Street Lighting Project, and safety upgrades from standard pavement maintenance projects.
Project Description
This Project includes eight separate projects, including five safety projects (see Attachment for Project Location Map) focused on the upper corridor of De La Vina Street. Safe streets and crossings are critical on Upper De La Vina Street due to its proximity to Cottage Hospital and the numerous related medical support facilities in the area. This area is adjacent to many apartment buildings, Oak Park, transit stops, and Santa Barbara City College’s school of extended learning. Individual project summaries are included below.
Council Agenda Report
Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement] November 12, 2024
The overall Project includes crosswalk, lighting, and Americans with Disabilities Act (ADA) improvements along De La Vina Street from Alamar Avenue to Padre Street, and Pedregosa to Valerio Streets.
Once this Project is complete, the only remaining intersection improvement on De La Vina Street will be at Vernon Road, which will be addressed as part of the De La Vina Bridge Replacement Project. The De La Vina Bridge Replacement Project is expected to be under construction by spring 2025.
Upper De La Vina Street Gap Closure and Safe Crossings Project This project is located on De La Vina Street from Alamar Avenue to Padre Street, on Padre Street from De La Vina Street to State Street, and the intersection of Alamar Avenue and Junipero Streets. The project improves safety for cyclists and pedestrians by installing curb extensions at six intersections and 210 feet of sidewalk infill to close gaps in the network on Padre Street. The project is primarily funded by the State’s Active Transportation Program (ATP). Portions of the bike lane striping were installed in 2021. The remaining pedestrian enhancements are included in the combined project.
Highway Safety Improvement Program Projects at De La Vina Street at Los Olivos, Pedregosa, and Valerio Streets
These three intersection projects are primarily funded by the Highway Improvement Safety Program (HSIP). Each intersection will include enhanced crosswalk features including curb extensions, signs/markings, and intersection lighting to increase visibility of the crosswalks at night.
De La Vina Street at Islay Streets Project
This intersection project is funded by the Measure C Fund and consists of curb extensions, signs/markings, and intersection lighting to increase visibility of the crosswalks at night.
De La Vina Water Main Replacement Project
As part of the City’s ongoing efforts to coordinate work within the right-of-way and minimize impacts to the community, the water main on De La Vina Street from Constance Avenue to Micheltorena Street will be replaced under this construction contract. The water main was identified by the City for future replacement and was prioritized for replacement with this Project due to the extent of the surface improvements planned for this corridor.
Completing the water main replacement prior to the hardscape improvements and final paving work will ensure the best possible finished product for the community and minimize the risk of future water main breaks that may damage the new hardscape. The water main replacement portion of the Project is funded by the Water Capital Fund.
Council Agenda Report
Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement] November 12, 2024
De La Vina Street Paving and Potential Restriping
Upon completion of the crosswalk, lighting, and water main replacement work on De La Vina Street, the City’s Street Paving Crew will pave De La Vina Street from Alamar Avenue to Micheltorena Street. As with all paving projects on Vision Zero Priority Corridors, City staff will perform a Vision Zero traffic safety assessment that may lead to extending the southbound bike lane from Padre Street to Arrellaga Street to improve safety for all road users. The City is currently evaluating the feasibility of restriping and if feasible, will engage the public and return to Council for direction prior to this paving work.
Milpas Street at U.S. Highway 101 Operational Improvements Project The project is critical to the success and safe operation of the U.S. Highway 101 Widening Project (HOV Project) and will address expected traffic impacts from the HOV Project. The Project will improve traffic operations along Milpas Street between the U.S. Highway 101 southbound on- and off-ramps and will include the following improvements:
Widening Milpas Street at the northeast corner of the intersection of Milpas and Hutash Streets to provide space for a new dedicated southbound left-turn lane onto eastbound Hutash Street. This will allow U.S. Highway 101 on- and off-ramp traffic to move concurrently when there is no traffic queued in the new left-turn lane; Traffic signal modifications at the intersection of Milpas and Hutash Streets to optimize signal phasing, improve synchronization with adjacent traffic signals, and reduce wait time;
Extending the existing median south of the U.S. Highway 101 underpass to the intersection of Milpas and Cacique Streets to prohibit left-turns from southbound Milpas Street onto eastbound Cacique Street. This will help prevent southbound offramp traffic from queueing onto the southbound U.S. Highway 101 mainline and blocking southbound Milpas Street. Eastbound Cacique Street will have access from northbound Milpas Street via the hook off-ramp; and
Installation of an elevated bike lane along Milpas Street between Cacique and Hutash Streets. This facility was a community-requested safety need to separate cyclists from vehicles due to the high traffic volumes in this area.
On April 13, 2021, Council authorized the City Administrator to enter into a MOU between the City and SBCAG to complete the design, environmental, and right-of-way phases for the Project. Because the phases are complete, City staff is requesting Council authorize the City Administrator to execute an Amendment to the MOU to increase the funding by $1,280,979 for the project’s construction, for a not-to-exceed amount of $1,675,979.
Community engagement for the project has consisted of in-person meetings and a community webinar over the past couple of years with the most recent meetings held in February 2024. The project has also been a topic of various public hearings with Council Council Agenda Report
Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement] November 12, 2024
and the SBCAG Board as the project fulfills the required mitigation requirement for the HOV Project.
Moffett Place Crosswalk Project
This project involves installation of an ADA compliant high-visibility crosswalk across Moffett Place connecting two existing bus stops adjacent to the Santa Barbara Airport Terminal. New street lighting and a pedestrian refuge island are also included. Many Airport Terminal staff, passengers, residents, and tourists depend on transit to get to and from the airport. The high-visibility crosswalk and street lighting will provide a safer, more predictable area for pedestrians to cross and make it easier for drivers to detect pedestrians crossing from farther away.
Community Engagement
Community engagement along the De La Vina corridor was primarily through community participation in the City’s Pedestrian and Bicycle Master Plan Updates and the Vision Zero Strategy effort documenting the community need for safer walking and biking facilities along this collision-prone corridor. The projects were supported by Move Santa Barbara County (formerly the Coalition for Sustainable Transportation and the Santa Barbara Bicycle Coalition) and local public health officials (County Public Health and Cottage Hospital).
During the construction phase, site-specific community engagement will continue.
Residents and businesses can expect to see sandwich board signs in the right-of-way detailing the project’s scope and contacts. Key updates will be posted on City News in Brief and Nextdoor.com. Prior to construction activity in a particular area, City staff will send a notification to residents and property owners with detailed information about the upcoming work in their neighborhood.
The contractor is required to perform door-to-door outreach with all businesses directly affected by the work a minimum of two weeks prior to the scheduled work. In addition, the contractor is required to deliver door hangers to each property adjacent to the work area 72 hours in advance of work commencement to notify residents of the planned schedule.
The contractor will post “No Parking” signs 72 hours in advance of work commencement.
Night work is anticipated along Milpas Street to minimize disruptions to businesses, residents, and traffic circulation.
Council Agenda Report
Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement] November 12, 2024
Contract Bids
A total of three bids were received for the subject work, ranging as follows:
BIDDER BID AMOUNT
1. Lash Construction, Inc. (Santa Barbara, CA) $7,323,130.00
2. Granite Construction Company (Santa Barbara, CA) $8,888,805.00
3. Toro Enterprise (Oxnard, CA) $10,022,596.00
The low bid of $7,323,130, submitted by Lash Construction Inc, is an acceptable bid that is responsive to and meets the requirements of the bid specifications.
The change order funding recommendation of $732,313, or 10 percent, is typical for this type of work and size of project.
BUDGET/FINANCIAL INFORMATION:
The Project improvements along the Upper De La Vina corridor are primarily funded by ATP and HSIP Grants with City-match monies by the Measure C Capital Fund. The water main replacement portion of the Project is funded by the Water Capital Fund. The improvements along Milpas Street are funded by local regional funds from the Regional Surface Transportation Program. The Moffett Place Crosswalk Project is funded by the Airport Capital Fund. With the funding sources and appropriations recommended in this report, there will be sufficient expenditure appropriations to cover the cost of construction.
The following summarizes all Project design costs, construction contract funding, and other Project costs:
Council Agenda Report
Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement] November 12, 2024
ESTIMATED TOTAL PROJECT COST
*Cents have been rounded to the nearest dollar in this table.
GRANT
CITY
SHARE
TOTAL
City Design Cost $1,235,932 $214,880 $1,450,812
Consultant Design Costs $0 $376,916 $376,916
Consultant Survey Costs $22,069 $0 $22,069
Design Subtotal $1,258,001 $591,796 $1,849,797
Construction Contract $3,425,683 $3,897,447 $7,323,130
Construction Change Order Allowance $0 $732,313 $732,313 Subtotal $3,425,683 $4,629,760 $8,055,443
Construction Management/Inspection (by
City Staff)
$168,376 $579,534 $747,910
Other Construction Support Costs (Material
Testing, Survey Monument Preservation,
SCE Meters, City Supplied Materials)
$239,570 $0 $239,570
De La Vina Street Midblock Striping $0 $82,965 $82,965
Subtotal $407,946 $662,499 $1,070,445
Construction Subtotal $3,833,629 $5,292,259 $9,125,888
TOTAL PROJECT COST $5,091,630 $5,884,055 $10,975,685
SUSTAINABILITY IMPACT:
The comprehensive goal and vision of the General Plan’s Circulation Element is: “While sustaining or increasing economic vitality and quality of life, Santa Barbara should be a city in which alternative forms of transportation and mobility are so available and attractive that use of an automobile is a choice, not a necessity.” Residents are more encouraged to shift to walking and biking when infrastructure is safe, which this Project addresses.
Shifting to walking and cycling will also improve mental and physical health, and reduce emissions, which is the quickest and most efficient way to decarbonize transport, which is also a Council-approved Climate Action Plan goal. The water main replacement will Council Agenda Report
Contract for Construction of the Upper De La Vina Street and Milpas Street at U.S. Highway 101 Operational Improvements Project [Resolution; Agreement] November 12, 2024
provide a safe and reliable water supply and reduce the risk of water main breaks on this corridor.
A copy of the agreement and MOU may be requested from the Public Works Department for public review by contacting [email protected].
ENVIRONMENTAL REVIEW:
The Public Works Director determined that the following projects were categorically exempt under the California Environmental Quality Act (CEQA), and Notice of Exemptions were filed with the County Clerk and the State Clearinghouse.
CEQA Exemption Criteria
Upper De La Vina Street Gap Closure and Safe Crossings Project: The project was determined to be exempt under CEQA Guideline § 15301 Existing Facilities (c), and 15304 Minor Alterations to Land (a) and (f) on November 22, 2022.
HSIP De La Vina Street at Pedregosa Street Project: The project was determined to be exempt under CEQA Guideline § 15301 Existing Facilities (c) on February 15, 2023.
HSIP De La Vina Street at Valerio & City Project De La Vina Street at Islay Street: The project was determined to be exempt under CEQA Guideline § 15301 Existing Facilities (c) on August 2, 2023.
Milpas Street at U.S. Highway Operational Improvements Project. The project was determined to be exempt under CEQA Guideline § 15301 Existing Facilities (c), 15303 New Construction (d) and 15304 Minor Alterations to Land (a) and (f) on April 11, 2023.
Water Main Replacement on De La Vina Street from Constance Avenue to Micheltorena Street Project: The project was determined to be exempt under CEQA Guideline § 15302 Replacement or Reconstruction (c) on August 27, 2024.
Moffett Place Crosswalk Project: The project was determined to be exempt under CEQA Guideline § 15301 Existing Facilities (c) on October 22, 2024.
ATTACHMENT: Project Location Map
PREPARED BY: Brian D’Amour, P.E., City Engineer/LY/AS/AF/sk Sarah Clark, Downtown Team Manager/JWG
SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator
Upper De La Vina Street Work Locations
Street Improvements
Water Main Relocation
ATTACHMENT
Milpas St At US 101 Santa Barbara Airport: Moffet Place
ATTACHMENT
RESOLUTION NO.
A RESOLUTION OF THE COUNCIL OF THE CITY OF
SANTA BARBARA AMENDING RESOLUTION NO. 24-066,
ADOPTING THE BUDGET FOR FISCAL YEAR 2025, TO
APPROPRIATE FUNDS FOR THE UPPER DE LA VINA
STREET AND MILPAS STREET AT HIGHWAY 101
OPERATIONAL IMPROVEMENTS PROJECT
WHEREAS, in accordance with the City Charter, the City Administrator filed with the Council a proposed budget for the fiscal year beginning July 1, 2024; WHEREAS, the City Council is required to adopt a budget before the beginning of the fiscal year on July 1, 2024;
WHEREAS, the City Charter provides that at any public meeting after the adoption of the budget, the City Council may amend or supplement the budget by motion adopted by the affirmative votes of at least a majority of the total members of the City Council; and WHEREAS, as authorized by Resolution No. 24-066, this Resolution approves the amendment to the budget as provided herein.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SANTA BARBARA THAT in accordance with the provisions of Section 1205 of the City Charter, the budget for the Fiscal Year 2025, as adopted by Resolution No. 24-066, is hereby amended as follows:
SECTION 1. The Council accepts an Active Transportation Program (ATP) grant in the amount of $1,670,000 for the ATP Upper De La Vina Street Gap Closure and Safe Crossing Project.
SECTION 2. The Council approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the amount of $1,670,000, funded by ATP grant funds, in Fiscal Year 2025 to fund the proposed ATP Upper De La Vina Street Gap Closure and Safe Crossing Project.
SECTION 3. The Council approves the allocation of available expenditure appropriations in the Sidewalk Infill Project in the Measure C Capital Fund in the amount of $200,000, authorizes the transfer of such funds to the Streets Grant Capital Fund, and approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the amount of $200,000, funded by the transfer, in Fiscal Year 2025 to fund the proposed ATP Upper De La Vina Street Gap Closure and Safe Crossing Project.
SECTION 4. The Council approves the allocation of available expenditure appropriations in the Sidewalk Repairs Project in the Measure C Capital Fund in the amount of $169,654, authorizes the transfer of such funds to the Streets Grant Capital Fund, and approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the amount of $169,654, funded by the transfer, in Fiscal Year 2025 to fund the proposed ATP Upper De La Vina Street Gap Closure and Safe Crossing Project.
SECTION 5. The Council accepts a Highway Safety Improvements Program (HSIP) grant in the amount of $646,300 for the HSIP Project at De La Vina Street and Los Olivos Street and De La Vina Street and Pedregosa Street.
SECTION 6. The Council approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the amount of $646,300, funded by HSIP grant funds, in Fiscal Year 2025 to fund the proposed HSIP Project at De La Vina Street and Los Olivos Street and De La Vina Street and Pedregosa Street.
SECTION 7. The Council approves the allocation of available expenditure appropriations in the Sidewalk Repairs Project in the Measure C Capital Fund in the amount of $149,758, authorizes the transfer of such funds to the Streets Grant Capital Fund, and approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the amount of $149,758, funded by the transfer, in Fiscal Year 2025 to fund the proposed HSIP Project at De La Vina Street and Los Olivos Street and De La Vina Street and Pedregosa Street.
SECTION 8. The Council accepts a Highway Safety Improvements Program (HSIP) grant in the amount of $235,350 for the HSIP Project at De La Vina Street and Valerio Street.
SECTION 9. The Council approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the amount of $235,350, funded by HSIP grant funds, in Fiscal Year 2025 to fund the proposed HSIP Project at De La Vina Street and Valerio Street.
SECTION 10. The Council approves the allocation of existing expenditure appropriations in the Sidewalk Repairs Project in the Measure C Capital Fund in the amount of $146,030, authorizes the transfer of such funds to the Streets Grant Capital Fund, and approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the amount of $146,030, funded by the transfer, in Fiscal Year 2025 to fund the proposed HSIP Project at De La Vina Street and Valerio Street.
SECTION 11. The Council accepts funds from the Santa Barbara County Association of Governments in the amount of $1,280,979 for the Milpas Street at U.S. Highway 101 Operational Improvements Project.
SECTION 12. The Council approves an increase in revenue and expenditure appropriations in the Streets Grant Capital Fund in the amount of $1,280,979, funded by Santa Barbara County Association of Governments funds, in Fiscal Year 2025 to fund the proposed Milpas Street at U.S. Highway 101 Operational Improvements Project.
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Finance Department
SUBJECT: Approval of Banking Services Agreement [Agreement] RECOMMENDATION:
That Council approve a New Banking Services Agreement with US Bank, at an estimated net cost of $2,000 per month.
DISCUSSION:
Background
On October 30, 2018, after the City had sent out a request for proposals (“RFP”) for banking and trust services, staff recommended staying with Union Bank and executing two amendments to the existing agreement (No. 25036), which had expired on December 31, 2017. Afterwards, the City and Union Bank executed five amendments, the last of which covered the one-year period between November 1, 2022, and October 31, 2023.
In May 2023, US Bank completed the acquisition of Union Bank and guaranteed continuity of the banking and trust custody services offered to the City. After successfully completing a six-month-long transition to US Bank, the City executed the sixth amendment to the existing agreement (No. 25036), which covered the one-year period between November 1, 2023, and October 31, 2024.
US Bank has been a reliable partner in providing the City with a wide range of essential banking services and innovative solutions. Therefore, staff recommend staying with US Bank and executing a new agreement that will incorporate the same fees and ECR (“Earnings Credit Rate”, the interest earned on monies the City has in its checking account which is used to offset fees) and include other minor adjustments to the terms.
The new agreement will cover a three-year period, from November 1, 2024, through October 31, 2027, and include an option for one two-year automatic renewal. US Bank will ensure the same level of services and keep the ECR unchanged at 0.75%. Today, Agenda Item No. 10
File Code No. 210.03
Council Agenda Report
Approval of Banking Services Agreement [Agreement]
November 12, 2024
the City’s net banking fees with US Bank, based on a $15.0 million average monthly balance and the 0.75% ECR, are approximately $2,000 per month, or $24,000 per year.
BUDGETARY INFORMATION:
The Finance Department’s Fiscal Year 2025 adopted expenditure budget has sufficient appropriation authority to cover the first year of the agreement.
A copy of the Agreement may be requested from the Finance Department for public review. Please contact [email protected] to request a copy.
PREPARED BY: Salvatore Parrilla, Treasury Analyst
SUBMITTED BY: Lyndsay Maas, Assistant Finance Director
APPROVED BY: Kelly McAdoo, City Administrator
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Parks and Recreation Department
SUBJECT: Grant Agreement with Summer Solstice Celebration, Inc. [Agreement] RECOMMENDATION:
That Council authorize the City Administrator to execute a grant agreement with Summer Solstice Celebration Inc. in an amount not to exceed $64,600 for the period July 1, 2024, to June 30, 2025.
DISCUSSION:
Grant funds for the Summer Solstice Celebration, Inc. (Solstice) are used for organizing, permitting, promoting, and sponsoring the community public arts workshop, annual parade and festival, as well as supporting year-round administrative expenses.
The organization plans the annual Summer Solstice celebration that includes a parade with a creative display of floats, giant puppets, whimsical costumes and masks, involving over 1,000 parade participants. The parade travels on Santa Barbara Street from the Community Arts Workshop to Alameda Park where the festivities continue over the weekend with live music, food, arts, and crafts.
BUDGET/FINANCIAL INFORMATION:
The Fiscal Year 2025 Adopted Budget includes $64,600 for this agreement. In addition to grant funding, the City provides in-kind services valued at $80,000 to support the safe delivery of the parade and festival. These services include: City staff time in the planning, permitting, and oversight of the events to ensure compliance with the permitted terms and conditions; public safety overtime costs; fee waivers for permitted public right of way closures, posting of temporary no parking signage; delivery and use of professional traffic equipment utility charges; storm drain protection; and post-event street sweeping.
Agenda Item No. 11
File Code No. 180.02
Council Agenda Report
Grant Agreement with Summer Solstice Celebration, Inc. [Agreement] November 12, 2024
SUSTAINABILITY IMPACT:
Consistent with the Special Event Planning Guide, event organizers and participants must abide by all city, county, state, and federal laws, which include, but are not limited to, efforts that reduce waste, greenhouse gas emissions, and litter and pollution to mitigate climate change impacts and promote healthier oceans and waterways. The City of Santa Barbara has multiple material bans in place, including, but not limited to, polystyrene (Styrofoam), plastic and compostable plastic straws, and single-use plastic bags. During the special event permitting process, the City Special Event Supervisor schedules meetings with the Sustainability and Resilience Department, Santa Barbara County Public Health Department, and Solstice representatives responsible for educating and ensuring vendors use approved alternative materials in accordance with City requirements.
A copy of the agreement may be requested from the Parks and Recreation Department for public review by contacting Courtney Carlson at [email protected].
PREPARED BY: Rich Hanna, Recreation Manager
SUBMITTED BY: Jill E. Zachary, Parks and Recreation Director APPROVED BY: Kelly McAdoo, City Administrator
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Water Resources Division, Public Works Department SUBJECT: Contract Amendment for Construction Management Services for the Wastewater Small Diameter Closed Circuit Television Program for Fiscal Years 2023-2025 [Agreement]
RECOMMENDATION:
That Council authorize the Public Works Director to execute the First Contract Amendment with Water Systems Consulting, Inc. for construction management services for the Wastewater Small Diameter Closed Circuit Television Program for Fiscal Years 2023-2025, Contract No. 28,340, in the amount of $99,855 for a total expenditure authority of $422,117.
DISCUSSION:
Background
The City of Santa Barbara (City) operates and maintains a 256-mile wastewater collection system with mains varying in size from 4-inches to 42-inches in diameter. The City expends significant resources to operate and maintain the wastewater collection system to minimize sanitary sewer overflows (SSO), which can pose a threat to public health and the environment. To optimize operations/maintenance and gather data for long term capital improvement planning, the City embarked on the Wastewater Small Diameter Closed Circuit Television Program for Fiscal Years 2023-2025 (Program), an ambitious plan to identify the condition of every pipe in the system by the end of calendar year 2025 through Closed Circuit Television (CCTV) inspection.
To accomplish this plan, the City awarded a contract in 2023 to the low bidder, Pipe Tec, Inc. (Pipe Tec), to video inspect, identify defects, and provide condition ratings on the remaining 225-miles of sewer mains that have not been inspected utilizing the nationally accepted Pipeline Assessment Certification Program (PACP) standard. Additionally, the City also awarded a contract to Water Systems Consulting, Inc. (WSC), through a competitive Request for Proposals process, to help staff review and evaluate the work of Pipe Tec.
Agenda Item No. 12
File Code No. 540.13
Council Agenda Report
Contract Amendment for Construction Management Services for the Wastewater Small Diameter Closed Circuit Television Program for Fiscal Years 2023-2025 [Agreement] November 12, 2024
Current Status
Pipe Tec has completed the first phase of inspections, which revealed significantly more pipe defects than were anticipated, resulting in a higher percentage of sewer mains requiring review by WSC than expected. WSC’s original proposal assumed that less than 20% of all sewer mains inspected would have significant defects that would warrant video review by WSC staff. This assumption was based on the percentages of defects the City had historically identified during inspections. The percentage of sewer mains with significant defects identified by Pipe Tec requiring WSC review has been over 50%, resulting in WSC being on track to exhaust the contract budget before the completion of the Program at the end of 2025.
Staff has successfully negotiated an amendment to the contract with WSC in the amount of $99,855 with a modified scope of work for review of the remaining phases of Pipe Tec’s inspection work. WSC will perform a detailed review of CCTV videos for all of the sewer mains Pipe Tec identifies as having severe defects and only 10% of the remaining sewer mains with moderate to significant defects. Staff recommends that Council authorize the Public Works Director to amend the contract with WSC in the amount of $99,855 for additional construction management services, for a total contract amount of $422,117.
BUDGET/FINANCIAL INFORMATION:
Funding
The following summarizes all Program costs.
ESTIMATED TOTAL PROGRAM COST
*Cents have been rounded to the nearest dollar in this table.
Closed Circuit Television Inspection (Pipe Tec Inc) $1,267,670 Construction Management Services (Water Systems
Consulting) - previously authorized and encumbered
$322,262
Amendment No. 1 (Water Systems Consulting) –
recommended
$99,855
Program Total $1,689,787
If the recommendation is approved, the total construction management services contract expenditure authority will be increased to $422,117.
There are sufficient expenditure appropriations in the Adopted Wastewater Operating Fund Budget in Fiscal Year 2025 to cover all remaining project costs, including the proposed contract amendment with WSC.
A copy of the contract amendment may be requested from the Public Works Department for public review by contacting [email protected].
Council Agenda Report
Contract Amendment for Construction Management Services for the Wastewater Small Diameter Closed Circuit Television Program for Fiscal Years 2023-2025 [Agreement] November 12, 2024
ENVIRONMENTAL REVIEW:
The Wastewater Small Diameter Closed Circuit Television Program falls outside the definition of a “Project” under California Environmental Quality Act (CEQA) Guidelines § 15378 (b)(5) as administrative activities of governments that will not result in direct physical changes in the environment are not subject to CEQA environmental review. The inspection and identification of pipe conditions will not result in direct or indirect physical impacts to the environment. Any future maintenance or repair projects as a result of this program will be subject to CEQA environmental review.
PREPARED BY: Joshua Haggmark, P.E., Water Resources
Manager/TW/EZ/sjc
SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Finance Department
SUBJECT: Self-Insured Workers' Compensation Program Annual Report RECOMMENDATION:
That Council receive the annual Self-Insured Workers’ Compensation Program Annual Report for the Year Ended June 30, 2024.
DISCUSSION:
California Labor Code Section 3702.6(b) requires staff to advise Council annually about two items relating to the City’s self-insured workers’ compensation program: (1) the value of the total accrued claim liabilities reported by the City on the State’s Self Insurers Annual Report; and (2) whether current accounting and financial reporting of those liabilities are in compliance with the requirements of Government Accounting Standards Board (GASB) Statement 10.
The California Department of Industrial Relations requires all self-insured public agencies to submit an annual report before October 1 each year that identifies the workers' compensation liabilities as of the prior fiscal year end. Risk Management staff submitted the Fiscal Year 2024 annual report on September 23, 2024.
The annual report submitted by the City identified results for claims reported during Fiscal Year 2024, including the results for all claims that remain open that were reported during a previous fiscal year. City employees reported 137 claims during Fiscal Year 2024; 84 of these claims required the City to pay disability compensation for time away from work.
The City paid $644,951 for disability benefits and $262,204 in medical care on the 137 claims reported during Fiscal Year 2024.
The report lists a total of 210 open claims (from all years). The total liability for these 210 claims equals $15,647,666 – consisting of $7,338,116 for indemnity (disability payments) and $8,309,550 for medical payments.
Agenda Item No. 13
File Code No. 350.08
Council Agenda Report
Self-Insured Workers' Compensation Program Annual Report November 12, 2024
The City accounts for its risk management operations in a separate Internal Service Fund, the Self-Insurance Fund (SIF). Every two years, the City contracts with a risk management actuarial firm to prepare an actuarial valuation of the accrued liabilities in the City’s selfinsured workers’ compensation program. The City uses the results of this actuarial valuation as well as claims information from our third party administrator (claims adjuster) to report the workers’ compensation accrued liabilities in both the City’s annual audit report (the “Annual Comprehensive Financial Report” or “ACFR”) and the required annual report submitted to the State of California. The City is partially funded for all of its actuarially determined workers’ compensation claim liabilities. The City also uses the actuarial information to develop the annual allocations from all operating deparmtents into the SIF to ensure adequate resources are available to pay insurance premiums and claims.
GASB Statement 10 established accounting and financial reporting standards for all City claims, including workers’ compensation claims. GASB Statement 10 requires governments to recognize a claim as an expense and liability if both of the following conditions are met:
1. Information available indicates that it is probable that a liability has been incurred; and,
2. The amount of the loss can be reasonably estimated.
In addition, GASB Statement 10 requires certain disclosures in the footnotes to the financial statements. All of the City’s workers’ compensation claims have been accounted for and reported in accordance with GASB Statement 10.
In summary, the City has met its obligation to file the required Public Self Insurers Annual Report with the State of California Office of Self Insurance Plans. The City also met its legal requirement to report the workers' compensation program liabilities to the City Council with this report. Council will receive a more complete description of the City’s selfinsured workers’ compensation program as part of the ACFR, for the fiscal year ended June 30, 2024.
BUDGET/FINANCIAL INFORMATION:
There is no direct budget or financial impact by Council receiving the Self-Insured Workers’ Compensation Program Annual Report.
ATTACHMENTS: 1. Public Self Insurers ER Annual Report (AR-2)
2. Self-Insurer’s Profile and Financial Summary Report (P-1) PREPARED BY: Mark W. Howard, Risk Manager
SUBMITTED BY: Keith DeMartini, Finance Director
APPROVED BY: Kelly McAdoo, City Administrator
State of California
Public Self Insurers
ER Annual Report
For Fiscal Year 2023-24
City of Santa Barbara
P.O. Box1990
Santa Barbara, CA 93102 1990
September 11, 2024
FORM AR-2 (1-2016)
ATTACHMENT 1
State of California
Employer
General Information:
Certificate Number 7144 Period Of Report Annual
(Period) From 07/01/2023 (Period) To 06/30/2024
Master Certificate Holder:
Name City of Santa Barbara
Address 1 P.O. Box1990
Address 2 FTIN 95-6000787
City Santa Barbara State CA Zip 93102 1990
State of Incorporation
State of California
During the reporting period of this report, has there been any of the following with respect to the Master Certificate Holder for any affiliate?
None
Any additions to the Self Insurance Program?
None
Employment and wages paid in current fiscal year:
Number of Employees 2,004
Total Wages and Salaries Paid $103,797,066
Addressed Correspondence For Related Self-Insurance Matters:
Company Name CITY OF SANTA BARBARA
Name MARK W HOWARD Title RISK MANAGER
Phone (805) 897-2654 Fax (805) 897-2642
Email Address [email protected]
Address 1 735 ANACAPA STREET
Address 2
City SANTA BARBARA State CA Zip 93102
Web Site
State of California
TPA Adjusting Locations:
Has there been a change in TPA Adjusting Locations during this reporting period that has not yet been reported to OSIP? No Have you added any new TPA Adjusting Locations during this reporting period that has not yet been reported to OSIP? No Record Storage:
Are there open and closed claims stored at a location other than the adjusting location? No Insurance Coverage:
1) During this reporting period, does your company maintain a standard workers' compensation insurance policy to cover any of your California liabilities?
No
2) During this reporting period, does your company have a specific excess workers' compensation policy in force to cover any of your California liabilities?
Yes
Insurance Company Name Policy Number Policy Issue Date
1) PRISM PE 23 EWC-04 07/01/2023
Attachment 23-24 City of Santa Barbara- EWC.pdf
Retention Limit $750,000
3) Do you carry an aggregate(stop loss) workers' compensation insurance policy? No
State of California
Certification By Authorized Representative:
Company Name CITY OF SANTA BARBARA
Name MARK W HOWARD Title RISK MANAGER
Phone (805) 897-2654 Fax (805) 897-2642
Email Address [email protected]
Address 1 735 ANACAPA STREET
Address 2
City SANTA BARBARA State CA Zip 93102
Name of Person Legally Responsible for this Electronic Signature:
Mark W Howard ( Date/Time of Signature ) - 09/11/2024 16:35
State of California
Report Location Number:
7144-60-092 A
Identification of Location
ADMINSURE, INC. at ONTARIO
Certificate Holder
City of Santa Barbara
CASES AND BENEFITS (to the nearest dollar) From Date- To DateDate # Incurred Liability
Indemnity Medical
Paid To Date
Indemnity Medical
Future Liability
Indemnity Medical
1) Cases open as of 06/30/2024
reported prior to 2019/20
2) Open and closed Liabilities
A) All Cases reported in 2019/20
2019/20 Cases open
B) All Cases reported in 2020/21
2020/21 Cases open
C) All Cases reported in 2021/22
2021/22 Cases open
D) All Cases reported in 2022/23
2022/23 Cases open
E) All Cases reported in 2023/24
2023/24 Cases open
84 $10,083,277 $11,734,000 $5,653,965 $6,668,270 $4,429,312 $5,065,730 132 $1,357,229 $902,253 $1,320,619 $717,428 $36,610 $184,825 7 $224,435 $289,278 $187,825 $104,453 $36,610 $184,825
137 $3,170,730 $1,621,171 $1,712,592 $785,901 $1,458,138 $835,270 16 $1,942,706 $1,099,277 $484,568 $264,007 $1,458,138 $835,270 208 $2,187,226 $1,497,489 $1,712,592 $785,901 $474,634 $711,588 26 $1,610,630 $1,247,504 $1,135,996 $535,916 $474,634 $711,588 145 $1,832,357 $1,579,687 $1,187,717 $593,188 $644,640 $986,499 36 $1,650,552 $1,489,963 $1,005,912 $503,464 $644,640 $986,499 137 $939,733 $787,842 $644,951 $262,204 $294,782 $525,638 55 $858,636 $736,234 $563,854 $210,596 $294,782 $525,638
SUBTOTAL
$ Indemnity
$7,338,116
$ Medical
$8,309,550
3) Estimate Future Liability (Indemnity Plus Medical) TOTAL $15,647,666 4) Total Benefits Paid During 2023/24 (Including all case expenditures). The indemnity amount includes the amount of LC § 4800/4850 benefits paid for the year (total of Lines 11 and 12)
$ Indemnity
$3,453,902
$ Medical
$1,718,866
5) Number of MEDICAL-ONLY Cases Reported in 2023/24 53
6) Number of INDEMNITY Cases Reported in 2023/24 84
7) Total of 5 and 6 (Also entered in 2E above) 137
8) Total Number of open Indemnity Cases (All Years) 210 9) Number of Fatality Cases Reported In 2023/24 0
10) (a) Number of FY 2023/24 claims for which the employer or administrator was notified of representation by an attorney or legal representative in 2023/24
7 10) (a) Number of non-FY 2023/24 claims for which the employer or administrator was notified of representation by an attorney or legal representative in 2023/24
6 11) Amount from salary continuation payments made pursuant to LC § 4800/4850 that is in excess of the applicable temporary disability rate for the period paid. $382,386
12) Amount from salary continuation payments made pursuant to LC § 4800/4850 capped at the temporary disability rate for the period paid.
$749,964
Files Uploaded
ALL Open Indemnity Claims (by reporting and by year) reported and with claims: Public SIP Indemnity MO Listing_Add Date ONT LOC.pdf 07/01/2023 06/30/2024
State of California
Dual Jurisdiction Claims
Please note that California Labor Code Section 3702.2(b) requires that "... the annual report of a self-insured employer who has self-insured both state and federal workers' compensation liability shall also be set forth (1) amount of all compensation liability incurred, paid-to-date, the estimated future liability under both this chapter and under the federal longshore and Harbor Worker's Compensation Act (33 U.S.C Sec. 901 et seq.), and (2) the identity and the amount of the security deposit securing the employer's liability under state and federal self-insured programs." Accordingly, please indicate all California exposure on your Self Insurer's Annual Report, and, in addition identify each Claim with dual jurisdiction on Separate List of Open Idemnity Claims. For those claims, indicate the incurred, paid-to-date, and estimated future liabilities for federal exposure. Please also indicate the amount and the type of security deposit securing those claims.
Instructions To Claims Administrator For Specific Excess Insurance The TPA should provide a sum of the unpaid excess carrier excess liability under “Calculation of Specific Excess Coverage Entry for the Annual Reports”.
In addition, provide a list of claims for which specific excess credit is being claimed. This may be provided as a spreadsheet. Indicate in the list of claims the following information:
The list shall include the name of the claimant, claim number, date of injury, description of injury, carrier name and policy number, policy coverage period, retention level of policy and paid to date in indemnity or medical benefits, and the estimated future liability of the claim minus the total unpaid employer retention, which equals the total unpaid carrier liability, whether the claim has been reported to a carrier, if the claim has been accepted by the carrier, if the carrier has denied any part of the liability of the claim.
Refer to OSIP website for sample format of the Excess Credit Calculation form.
Calculation Of Specific Excess Coverage Entry For Annual Reports:
Enter the sum of the total unpaid carrier excess liability claimed from the "Specific Excess Insurance Policy Coverage". If none enter "0".
$ 5921134
Files Uploaded
Specific Excess Insurance Policy pages: Excess Calculation Form.xlsx Certification
Administrating Agency's Certificate Number 092
Or Self Administered
I declare under penalty of perjury that I have prepared or caused this report to be prepared and I have examined this liabilities report to be prepared and I have examined this liabilities report of this self insurer's worker's compensation liabilities. To the best of my knowledge and belief this report is true, correct and complete with respect to the worker's compensation liabilities incurred and paid. I further declare under the penalty of perjury that the estimates of future liability of worker's compensation claims made in this report reflect the administrator's best judgement as to the future liability of claims, using prevailing industry standards, and the signatory intends Self Insurance Plans to rely upon the representation.
Agency Name ADMINSURE, INC.
Name Nerissa Burnside
Phone (909) 861-0816 Fax
Email Address [email protected]
Address 1 3380 Shelby Street
Address 2
City Ontario State CA Zip 91764
Name of Person Legally Responsible for this Electronic Signature:
Nerissa Burnside ( Date/Time of Signature ) - 08/16/2024 14:31
ATTACHMENT 2
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Finance Department
SUBJECT: Measure C Annual Accountability Report for Fiscal Year 2024 RECOMMENDATION:
That Council accept the Measure C Annual Accountability Report for the Fiscal Year (FY) Ended June 30, 2024.
DISCUSSION:
In November 2017, Santa Barbara voters approved Measure C, which established a 1.0% district sales tax. The proceeds of the tax, estimated at approximately $31.0 Million per fiscal year, were to be used to fund critical infrastructure capital projects, including streets, sidewalks, storm drains, a new police station, and other City facilities. The Measure C sales tax became effective on April 1, 2018, and will continue indefinitely.
Language articulating priorities as part of the ballot measure was developed from a robust community outreach effort. The Measure C ballot measure articulated the following priorities:
1. Police, Fire, and 911 emergency medical response;
2. Local streets, potholes, bridges, and storm drains;
3. Neighborhood fire stations/public safety infrastructure;
4. Parks, youth/senior services;
5. Address homelessness;
6. Help retain local businesses; and
7. Support other general services.
Measure C required the formation of a seven-member Citizens’ Oversight Committee (Committee). The role of the Committee is to ensure Measure C revenues are spent as intended and in accordance with the tax ordinance. Measure C also required the preparation of an Annual Accountability Report (Report). The Report is intended to show what revenues were received and how those revenues were used. Because Measure C Agenda Item No. 14
File Code No. 260.02
Council Agenda Report
Measure C Annual Accountability Report for Fiscal Year 2024 November 12, 2024
sales tax revenues are not legally restricted special taxes, it is important to demonstrate to the community that the City is using the revenues in the manner intended by the voters.
On February 6, 2018, the City Council adopted a resolution establishing priorities for Measure C expenditures. The Council determined that for the first five fiscal years the top priorities would include:
1. Planning, permitting, and bonding for a new police station facility;
2. Repairing local streets throughout the City, including related street infrastructure;
3. Replacing Fire Station No. 7;
4. Community projects to support the City's parks and library;
5. Business district infrastructure projects; and
6. Maintenance of City buildings.
The Committee met on October 25, 2023, and made recommendations to staff and the City Council regarding the priority of funding for the next five years. On December 14, 2023, the City Council adopted a resolution affirming the priorities to include:
1. Construction and debt service payments for a new police station facility;
2. Repairing local streets throughout the City, including related street infrastructure, improving toward a Pavement Condition Index (PCI) goal of 75+ in the next 10-12 years;
3. Address drainage infrastructure by completing a full assessment of the City’s drainage infrastructure;
4. Community projects to support the City’s parks and library;
5. Business district infrastructure projects, with a focus on the State Street Promenade;
6. Maintenance of City Buildings; and
7. Address homelessness by prioritizing housing and facilities.
Summary of Annual Accountability Report for Fiscal Year 2024 As mentioned, the preparation of the Report is required by the Measure C ballot language and adopted ordinance. Its purpose is to provide a complete accounting of all Measure C sales tax revenues and a detailed discussion of how those funds were directed . These requirements are intended to ensure full transparency to the community and to demonstrate compliance with the intentions and priorities of the community supporting Measure C.
In addition to presenting the Report to the Committee, the Report will be provided annually to the City Council and posted to the Committee page on the City’s website so that anyone in the community can access the Report electronically.
The table below summarizes the Measure C-related expenditures through June 30, 2024, by major program area. In total, approximately $33.5 Million of expenditures were incurred on priority capital projects, the most significant in street repaving and other related projects.
Council Agenda Report
Measure C Annual Accountability Report for Fiscal Year 2024 November 12, 2024
The adopted Measure C budget for FY2025 is higher than prior estimates, as sales tax revenues continue to grow modestly year over year. Sales tax revenues continue to be more volatile than other tax sources and are more challenging to predict.
PROGRAM ($ MILLIONS) REVISED
BUDGET
ACTUAL
EXPENDITURE ENCUMBRANCE REMAINING
Police $3.9 $2.3 $1.6 $0.1
Fire $0.6 $0.2 $0.4 $0.3
City Administration $0.7 $0.4 $0.0 $0.3
Community Development $1.1 $0.6 $0.4 $0.2
Streets $44.9 $21.6 $16.8 $6.4
Facilities $5.7 $1.4 $0.6 $3.7
Library $6.1 $4.1 $0.7 $1.3
Parks & Recreation $13.0 $1.5 $1.4 $9.9
Public Works $2.8 $1.4 $0.2 $1.1
Total $78.8 $33.5 $22.1 $23.3
The Report goes into detail regarding each project funded using Measure C funds and is attached for your further review. This report leverages the OpenGov technology to provide Measure C funded projects in web format similar to how the City’s budget is prepared and presented. Staff presented the Report for Fiscal Year ended June 30, 2024, to the Committee on October 23, 2024. The Committee members expressed support for receiving the Report. The next Committee meeting is tentatively scheduled for February 26, 2025, where staff will provide an update of FY2025 projects in coordination with the upcoming budget process.
BUDGET/FINANCIAL INFORMATION:
There is no budget or financial impact from the review and acceptance of the Report for Fiscal Year ended June 30, 2024.
The Report for FY2024 and for prior years can be accessed at the following site:
https://SantaBarbaraCA.gov/Finance/Budget-Reports
A direct link to the Report can be found here.
ATTACHMENT: Measure C Annual Accountability Report 2024 PREPARED BY: Natalija Glusac, Budget Manager
SUBMITTED BY: Keith DeMartini, Finance Director
APPROVED BY: Kelly McAdoo, City Administrator
Measure C
ANNUAL ACCOUNTABILITY REPORT
Prepared for: Citizens' Oversight Committee
October 23, 2024
Powered by OpenGov
ATTACHMENT
Table of Contents
INTRODUCTION TO MEASURE C ............................................................................................. 1 COUNCIL ESTABLISHED PRIORITIES FOR MEASURE C FUNDING ...................................... 3 FY2024 SCHEDULE OF SOURCES AND USES MEASURE C .................................................. 5 FY2024 PROJECT INFORMATION SHEETS
Police
Santa Barbara Police Station Project ..................................................................................... 7 Police Equipment Replacement ............................................................................................ 8 Fire
Emergency Response Equipment Replacement ..................................................................... 9 Emergency Vehicle Electronic Infrastructure Upgrades ........................................................ 10 City Administration
Homeless Response ........................................................................................................... 11 Special Election - Measure A ............................................................................................... 12 Community Development
State Street Master Plan ...................................................................................................... 13 Paseo Nuevo Development Eval .........................................................................................14 Streets
Paving at City Facilities........................................................................................................ 15 Public Works Corporate Yard Repave .................................................................................. 16 Overlays Project.................................................................................................................. 17 Sidewalk Replacement, Repairs, and Access Ramps ........................................................... 18 Sidewalk Repairs ................................................................................................................ 19 Cliff Drive: Urban Highway to Complete Street Transformation ............................................. 20 Drainage Improvements ...................................................................................................... 21 Westmont Storm Drain ........................................................................................................ 22 Drainage: Citywide Drainage Assessment ............................................................................ 23 Drainage: Gutierrez Storm Drain Improvements ................................................................... 24 Laguna Pump Station .......................................................................................................... 25 Traffic Signal Upgrades & Maintenance – Upgrades .............................................................. 26 Traffic Signal Upgrades & Maintenance – Maintenance ......................................................... 27 Street Lighting Improvements .............................................................................................. 28 Streetlight Maintenance ...................................................................................................... 29 Pedestrian Enhancement: Annual Sidewalk Infill .................................................................. 30 ATP State St Undercross @ Hwy101 ..................................................................................... 31 De La Vina Street Bridge Replacement Project ..................................................................... 32 Las Positas Multiuse Pathway ............................................................................................. 33 Modoc Multiuse Path Extension ........................................................................................... 34 Traffic Management System ................................................................................................ 35 HSIP W Carrillo Light & Signal Upgrade ................................................................................ 36 Carrillo Gymnasium Renovation .......................................................................................... 37 Carrillo Gym - Minor Renewal .............................................................................................. 38 City Hall Plumbing and Restroom Upgrades ......................................................................... 39 Facilities
2023 Storm Remediation - P&R Buildings ............................................................................. 40 Facilities Master Plan .......................................................................................................... 41 Facilities Renewal, HVAC Maintenance & Replacement ....................................................... 42 Facilities Renewal, Flooring, Paint, and Finishes .................................................................. 43 Facilities Renewal, Building Security Upgrades .................................................................... 44 Facilities Renewal, Annual Sewer Lateral Repair .................................................................. 45 Facilities Renewal, Miscellaneous Minor Facilities Projects .................................................. 46 Minor Renewal - Los Baños Building .................................................................................... 47 Minor Renewal – Fire Station 6 ............................................................................................. 48 Minor Renewal – La Mesa Park Restroom ............................................................................. 49 Minor Renewal – Municipal Tennis Court Building ................................................................. 50 Minor Renewal – 630 Garden Building .................................................................................. 51 630 Garden Bldg. Office Improvements ............................................................................... 52 PD Annex ............................................................................................................................ 53 Library
Eastside Library Construction - Garage ................................................................................ 54 Library Technology Replacement ......................................................................................... 55 Central Library Lower-Level Workspace Renovation ............................................................. 56 Central Library Lobby Update .............................................................................................. 57 Library Plaza Renovation ..................................................................................................... 58 Central Library Historic Doors and Tympanum ..................................................................... 59 Faulkner Gallery Interior Renovation .................................................................................... 60 Central Library Faulkner Gallery AV Equipment Upgrade ...................................................... 61 Central Library Exterior Faulkner Doors ................................................................................ 62 Central Library Americans with Disabilities Act (ADA) Elevat ................................................. 63 Central Library Roof Terrace Renovation .............................................................................. 64 Central Library Upper-Level Needs Assessment ................................................................... 65 Parks & Recreation
Louise Lowry Davis Renovation ........................................................................................... 66 Dwight Murphy Field Renovation .......................................................................................... 67 Cabrillo Pavilion Renovation - Loan Repayment ................................................................... 68 Ortega Park Renovation ....................................................................................................... 69 Shoreline Park Safety Improvements ................................................................................... 70 Moreton Bay Fig Tree ........................................................................................................... 71 Urban Forest Management Plan Implementation ................................................................. 72 Chase Palm Park Renovation ............................................................................................... 73 Westside Center Event Renovation ...................................................................................... 74 Park & Recreation Equipment Replacement ......................................................................... 75 Park Infrastructure Safety Program ...................................................................................... 76 West Beach Splash Playground ........................................................................................... 77 Playground Replacement Program ...................................................................................... 78 Municipal Tennis Center ...................................................................................................... 79 Alameda Plaza Renovation .................................................................................................. 80 Franceschi Park Renovation ................................................................................................ 81 Trails and Walkways ............................................................................................................ 82 Plaza del Mar Band Shell Renovation ................................................................................... 83 Public Works
De La Guerra Plaza Revitalization ........................................................................................ 84 Business Corridor Improvements ........................................................................................ 85 Americans with Disabilities Act (ADA) Transition Plan ........................................................... 86 Walkways & Building Pathways ............................................................................................ 87 FY2025 ADOPTED BUDGET – SCHEDULE OF SOURCES AND USES ................................. 88 MEASURE C FY2025 PROJECTS ........................................................................................... 90
INTRODUCTION TO MEASURE C
Santa Barbara voters passed Measure C in November 2017, which introduced a one-cent sales tax increase. The City of Santa Barbara (City) allocates the resulting revenue, currently estimated at $34.2 million annually, to support essential infrastructure projects.
Measure C mandates an Annual Accountability Report to detail how funds were utilized in the previous year. Since Measure C revenues are not legally restricted, it's crucial for the community to see that the City is honoring its promise to use these funds for addressing critical infrastructure needs.
FISCAL YEAR 2024 HIGHLIGHTS
Measure C funding is essential for maintaining a vibrant and sustainable business environment, helping to support and retain local businesses.
Street maintenance remains a top priority, with a substantial portion of Measure C funding allocated to repaving roads, repairing sidewalks, replacing bridges, and fixing potholes. Funds allocated to sidewalk repairs and access ramps provide accessibility in accordance with the Americans with Disabilities Act (ADA) requirements. These projects prioritize pedestrian mobility throughout the City, focusing on key areas such as medical offices, hospitals, and grocery stores.
Measure C is also improving safety with the Milpas Street Crosswalk Safety and Sidewalk Widening Project by widening sidewalks at street corners and transit stops, installing high visibility crosswalks, additional lighting, improving cyclist access, and more. The De La Vina Street Bridge Replacement Project is replacing the 108-year-old structurally deficient bridge with one that meets current seismic, safety, and design standards. The Project also includes relocating utilities including domestic water and sanitary sewer facilities, landscape materials, and creek and habitat restoration.
The Business Corridor Improvements Project improves the commercial district infrastructure on Coast Village Road; with work including installation of pedestrian activated rapid flashing beacons, repairing deteriorated sidewalks and curbs, and making sidewalk access ramps ADA compliant.
The State Street Promenade Redesign Project is revitalizing the center of town to provide a more vigorous and sustainable State Street business district for tourists and community members, facilitating sustainable economic growth. Some improvements include repairs to sidewalks, drinking fountains, landscape enhancement, and painting curbs, resulting in a safer, cleaner, and aesthetically pleasing business district. The City also enhanced illumination and saved electricity and money with the Street Lighting Improvements Project, which installed LED systems in existing streetlights in the public rightof-way.
Measure C funding supports the City’s first responders’ renovation projects. This includes the construction planning, permitting, and bonding for the new Santa Barbara Police Station facility, which will construct a new building to replace the current station and consolidate operations with three other locations. The new Station will provide the community better access to services, improve public relations, as well as technical improvements for today’s society. For first responders to stay healthy and ready for any incident that may occur, Fire Station 6’s training facility will also be repaired with Measure C funds.
The Fire Department is strategically replacing and repairing first response equipment through the Emergency Response Equipment Replacement Project, as well as an electronic infrastructure upgrade to fire apparatuses in preparation for regional dispatch through the Emergency Vehicle Electronic Infrastructure Upgrades Project. 1 Measure C funds will address critical infrastructure maintenance, repairs, rehabilitation, and improvements to the City’s 160 miles of storm drain channels and pipes. This helps prevent floods, storm runoff management, and supports the protection of property and infrastructure. The Drainage: Citywide Drainage Assessment Project assesses the condition and location of our existing storm water facilities for the Public Works Department to develop a system wide renewal program, while the Drainage:
Gutierrez Storm Drain Improvements Project enhances drainage for the lower Downtown area to reduce flooding during the storm season. Other projects that improve the drainage capacity include the Westmont Storm Drain and Laguna Pump Station Repairs.
Measure C provides funding for projects aligning with City Council’s priorities for protecting parks, youth, and senior services.
The Dwight Murphy Field Renovation Project consists of the conversion of the existing grass soccer field to a multi-sport synthetic turf field, a new natural turf youth baseball field, a new inclusive playground, a new fitness area, a new family picnic area, and a new prefabricated restroom facility. The Chase Palm Park Renovation will update infrastructure including park restrooms, the pavilion shade structure, and renovations to the patio which will increase site safety and enhance community use. Measure C will also fund the Ortega Park Renovation, which includes rehabilitating the park with a synthetic turf field, a year-round pool for lap swimming, aquatic programs, children’s slide and splash pad area, new park restroom facilities, a basketball court, and more. Also, the West Beach Splash Playground, which has been closed since 2014, will be replaced with either a new wading pool or a splash playground.
Addressing homelessness with a focus on housing and facilities is also a main priority for Measure C resources. Funding will be applied to the downtown Daytime Navigation Center “Faro,” providing housing and employment assistance and behavioral health services. Maintenance of City buildings ensuring accessibility and inclusion is also a priority for Measure C allocations.
The Central Library ADA Elevator Project enhances accessibility to all Library floors and programs by installing a new ADAcompliant elevator.
The Citizens’ Oversight Committee Annual Accountability Report, as well as information about these projects and more, is available at SantaBarbaraCA.gov/citizens-oversight-committee.
Powered by OpenGov
2 COUNCIL ESTABLISHED PRIORITIES FOR
MEASURE C FUNDING
GENERAL ALLOCATION ARTICULATED IN BALLOT MEASURE
√ Police, Fire, and 911 emergency medical response.
√ Repairing local streets, potholes, bridges, and storm drains. √ Maintaining neighborhood fire stations and upgrading public safety infrastructure. √ Protecting parks, youth, and senior services.
√ Addressing homelessness.
√ Helping retain local businesses.
√ Supporting other general services.
COUNCIL STATED PRIORITIES FOR THE FIRST FIVE YEARS *
√ Planning, permitting, and bonding for a new police station facility. √ Repairing local streets throughout the City, including related street infrastructure. √ Replacing Fire Station No. 7.
√ Community projects to support the City's parks & library. √ Business district infrastructure projects.
√ Maintenance of City buildings.
* Resolution 18-011, City Council adopted February 6, 2018.
COUNCIL STATED PRIORITIES FOR THE SECOND FIVE YEARS *
√ Construction and debt service payments for a new police station facility. √ Repairing local streets throughout the City, including related street infrastructure, improving toward a Pavement Condition Index (PCI) goal of 75+ in the next 10-12 years. √ Address drainage infrastructure by completing a full assessment of the City's drainage infrastructure. √ Community projects to support the City's parks & library. √ Business district infrastructure projects, with a focus on the State Street Promenade. √ Maintenance of City buildings.
√ Address homelessness by prioritizing housing and facilities. * Resolution 23-161, City Council adopted December 12, 2023.
Signed Resolution available at www.santabarbaraca.gov
3 SCHEDULE OF SOURCES AND USES MEASURE C
Fiscal Year Ended June 30, 2024
SOURCES Budget Carryovers Amendments Revised
Budget
Actual
Revenue N/A Remaining
Measure C Revenue $46,837,855 - $(12,638,405)$34,199,450 $34,199,450 - -
TOTAL SOURCES
USES Budget Carryovers Amendments
Revised
Budget
Actual
Expenditure Encumbered Remaining
Police
Police Station $2,000,000 $1,690,064 $(180,000) $3,510,064 $1,956,653 $1,469,540 $83,871 Police Equipment
Replacement 450,000 - - 450,000 314,610 85,382 50,009
Fire
Emergency Response
Equipment Replacement 370,000 - - 370,000 134,380 36,374 199,245 Emergency Vehicle Electronic
Infrastructure Upgrades 196,400 - - 196,400 106,491 - $89,909 City Administration
Homeless Response 500,000 - - 500,000 221,710 - 278,290 Special Edition - Measure A - - 180,000 180,000 180,000 - - Community Development
State Street Master Plan 500,000 519,525 - 1,019,525 542,837 293,084 183,604 Paseo Nuevo Development
Evaluation - - 170,040 170,040 70,531 99,509 -
Streets
Pavement Improvements 19,600,000 7,804,386 (4,255,521) 23,148,865 12,738,996 9,719,727 690,142 Lower State Street
Connectivity Project 2,500,000 1,091,000 (3,5914,000) - - - - Sidewalk Replacement,
Repairs & Access Ramps 2,400,000 1,942,143 (500,000) 3,842,143 1,317,503 2,524,640 - De La Guerra Bridge 1,000,000 - (1,000,000) - - - -
Cliff Drive: Urban Highway
Street Transformation 900,000 - (900,000) - - - -
Drainage Improvements 700,000 2,275,720 1,374 2,977,094 796,170 1,160,553 1,020,371 Traffic Signal Upgrades &
Maintenance 620,000 901,474 93,600 1,615,074 720,671 834,718 59,685 Street Lighting Improvements
& Maintenance 300,000 507,775 (79,794) 727,981 230,497 1,490 495,995 Pedestrian Enhancements:
Sidewalk Infills 100,000 200,000 - 300,000 128,532 71,468 100,000 Active Transportation Plan
Projects 75,000 - 9,338,456 9,413,456 5,030,017 1,981,464 2,401,975 De La Vina Bridge - 76,000 1,524,000 1,600,000 - - 1,600,000 Multiuse Pathways - 638,406 161,100 799,506 355,526 379,313 64,667 Traffic Management System - 440,128 - 440,128 266,835 163,561 9,731 Facilities
Carrillo Gym Renovation - 2,532,737 - 2,532,737 1,966 94,527 2,436,245 4 City Hall - Plumbing &
Restroom Upgrades - 372,340 - 372,340 853 21,077 350,410 Parking Lots - Public Works
Corporate Yard Repave - 99,818 - 99,818 - - 99,818
2023 Storm Remediation - - 380,000 380,000 469,634 209,429 (299,063) Minor Renewal Facilities
Improvement Projects 1,050,000 184,150 50,000 1,284,150 698,298 109,339 476,513 Minor Renewal - Los Baños
Building - 357,000 - 357,000 134,745 94,240 128,015
Minor Renewal - Fire Stations - 195,000 (95,000) 100,000 - - 100,000 Minor Renewal - Parks
Restrooms - 145,000 - 145,000 400 - 144,600
Minor Renewal - Municipal
Tennis Building - 135,873 (88,633) 47,240 39,740 7,500 - Minor Renewal - 630 Garden
Street Buildings - 279,409 (140,000) 139,409 - - 139,409 630 Garden Building Office
Improvements - - 120,000 120,000 - - 120,000
Police Annex Purchase - 97,600 - 97,600 (293) 97,600 293 Library
Eastside Library Garage
Construction 500,000 200,000 (571,000) 129,000 - - 129,000 Library Technology
Replacement 187,450 - - 187,450 175,612 - 11,838
Central Library Lower-Level
Workspace Renovation - 1,562,009 (70,064) 1,491,946 1,054,537 472,211 (34,803) Library Plaza Renovation - 247,246 1,571,752 1,818,998 1,858,438 91,043 (130,482) Central Library Historic Doors
& Tympanum 250,000 (288,000) 288,000 250,000 3,198 - 246,803 Central Library Faulkner
Gallery Renovations 360,000 - 260,000 620,000 79,188 31,500 509,313 Central Library ADA Elevator 160,000 2,156,692 (873,752) 1,443,210 964,865 64,906 413,439 Central Library Upper-Level
Needs Assessment - 149,249 - 149,249 - - 149,249
Parks & Recreation
Louise Lowry Davis
Renovation - 1,434,223 - 1,434,223 359,727 712,785 361,711 Dwight Murphy Field
Renovation 6,000,000 265,179 - 6,265,179 188,125 241,281 5,835,773 Cabrillo Pavilion Renovation -
Loan Repayment 747,371 522,411 - 1,269,782 32,000 - 1,237,782 Ortega Park Renovation - 580,660 - 580,660 93,539 487,121 - Shoreline Park Safety
Improvements - - 250,000 250,000 1,913 - 248,087
Moreton Bay Fig Tree - - 191,200 191,200 - - 191,200
Tree Planting - Urban Forest
Plan 250,000 1,004 - 251,004 249,880 - 1,124
Chase Palm Park Renovation - - 153,560 153,560 - - 153,560 Westside Center Event
Renovation - - 288,633 288,633 - 261,037 27,595
Parks & Recreation Equipment
Replacement 337,000 - - 337,000 221,724 29,268 86,008
Park Infrastructure Safety
Program 100,000 - 5
(50,000) 50,000 - - 50,000
West Beach Splash Ground 250,000 - (250,000) - - - -
Playground Replacement 75,000 233,984 - 308,984 18,680 - 290,303 Municipal Tennis Center
Renovation 500,000 - - 500,000 - - 500,000
Alameda Plaza Renovation 300,000 - - 300,000 27,196 - 272,804 Franceschi House
Rehabilitation 500,000 - - 500,000 - - 500,000
Trails & Walkways 100,000 - (50,000) 50,000 - - 50,000
Plaza del Mar Band Shell
Renovation - 175,000 135,000 310,000 282,254 - 27,746
Public Works
Plaza de La Guerra
Revitalization Project - 5,358,442 180,000 715,442 508,961 196,983 9,498 Business Corridor
Improvements 500,000 861,393 - 1,361,393 759,222 11,835 590,336 ADA Transition Plan & Facility
Walkways - 682,875 - 682,875 132,111 27,689 523,075
TOTAL USES $44,378,221$32,185,183 $2,261,950$78,825,355 $33,468,471 $22,082,195$23,274,694 Powered by OpenGov
6 PROJECT TITLE:
Santa Barbara Police Station Project
WHY THIS PROJECT?
The existing Santa Barbara City Police Station,
located at 215 East Figueroa Street, was constructed
in 1959. Since that time, there have been substantial
increases in both City population and Police
Department staff. In addition, the building does not
meet modern seismic safety and accessibility
standards., Together, growth and insufficient building
standards have created the need for a new,
accessible, and modernized facility.
BENEFITS
The Department currently operates out of,four different locations and the new building will bring the entire Department under one roof. This will improve efficiency, collaboration, and morale. The new building will provide better access to services for the community, improve public relations, and will bring the police force the needed technical improvements expected in today's society. The building will be flexible for future changes to policing and can adapt to whatever the future holds.
QUICK FACTS
LOCATION: 601 Santa Barbara Street (Cota Commuter Parking Lot) DESIGN SCHEDULE: Estimated Building Permit Date – summer 2024 CONSTRUCTION SCHEDULE: Approximately 28 months, completion in late 2026 TOTAL PROJECT COST: Approximately $90 million
FUNDING SOURCE:
Measure C, Bond Measure, Potential Grants for Solar,
Project Website: SantaBarbaraCA.gov/projects/santabarbara-police-station-project
COUNCIL ESTABLISHED PRIORITIES MET
Police, Fire, and 911 emergency medical response.
Upgrading public safety infrastructure.
Protecting parks, youth, and senior services.
Addressing homelessness.
Helping retain local businesses.
CONTACT INFORMATION
Project Manager: Brad Hess, Principal Project Manager
Phone:(805) 564-5373
E-mail: [email protected]
Santa Barbara Police Station Project
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $537,065 $1,961,267 $1,956,653
TOTAL $537,065 $1,961,267 $1,956,653
7 PROJECT TITLE:
Police Equipment Replacement
WHY THIS PROJECT?
This project allows the City to forecast operational
equipment needs for the Police Department, reducing
the annual augmentation requests for equipment
replacement.
BENEFITS
The project will increase safety and reliability of equipment with the development of a replacement schedule.
The project will allow greater budget transparency by funding known costs to the Department and reducing supplemental funding requests.
QUICK FACTS
LOCATION: N/A
DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: N/A
TOTAL PROJECT COST: $450,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Police, Fire, and 911 emergency medical response.
CONTACT INFORMATION
Project Manager: Lori Pedersen, Administrative Manager
Phone: (805) 897-2400
E-mail: [email protected]
Police Equipment Replacement
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $314,610
TOTAL $0 $0 $314,610
8 PROJECT TITLE:
Emergency Response Equipment Replacement
WHY THIS PROJECT?
To allow the City to forecast operational equipment
needs for the Fire Department, reducing the annual
augmentation requests for equipment replacement.
BENEFITS
The project will increase safety and reliability of equipment with the development of a replacement schedule.
The project will allow greater budget transparency by funding known costs to the Department and reducing supplemental funding requests
QUICK FACTS
LOCATION: 925 Chapala St, Santa Barbara, CA 93101
DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: N/A
TOTAL PROJECT COST: $370,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Police, Fire, and 911 emergency medical response.
CONTACT INFORMATION
Project Manager: Amy Van Atta, Fire Business Manager
Phone:(805) 564-5708
E-mail:[email protected]
Emergency Response Equipment Replacement
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $134,380
TOTAL $0 $0 $134,380
9 PROJECT TITLE:
Emergency Vehicle electronic Infrastructure Upgrades
WHY THIS PROJECT?
Electronic infrastructure upgrade to fire apparatus in
preparation for regional dispatch.
BENEFITS
This project will ensure all integration platforms and technology meet current and future needs to provide for a seamless transition to the Regional Fire Commnications Center.
QUICK FACTS
LOCATION: Fire apparatus throughout Santa Barbara City
DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: N/A
TOTAL PROJECT COST: $196,400
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Police, Fire, and 911 emergency medical response.
CONTACT INFORMATION
Project Manager: Amy Van Atta, Fire Business Manager
Phone:(805) 564-5708
E-mail:[email protected]
Emergency Vehicle Electronic Infrastructure Upgrades
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $106,491
TOTAL $0 $0 $106,491
10 PROJECT TITLE:
Homeless Response
WHY THIS PROJECT?
This annual funding will help support address
homelessness by prioritizing housing and facilities as
outlined by Council Approved Priorities for Measure
C.
BENEFITS
This initial funding will go directly to the lease agreement for the Daytime Navigation Center named "Faro" located in the downtown area. This center brings together a network of service providers to offer resources such as housing navigation, employment assistance, and behavioral health services in a centralized, onestop-shop location.
QUICK FACTS
LOCATION: 621 Chapala Street
DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: N/A
TOTAL PROJECT COST: $500,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Addressing homelessness.
CONTACT INFORMATION
Project Manager: Barbara Andersen, Senior Assistant to the City Administrator Phone:(805) 564-5302
E-mail:[email protected]
Homeless Response
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $221,711
TOTAL $0 $0 $221,711
11 PROJECT TITLE:
Special Election - Measure A
WHY THIS PROJECT?
This funding supports efforts around a Special
Election in Spring of 2024 for voter consideration on
a proposed change in City Charter language to
provide the City with greater flexibility and efficiency in bidding projects. This provision was used in
bidding the new Police Station construction contract.
BENEFITS
This project allows the City greater flexibility and efficiency in bidding contracts.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Complete
CONSTRUCTION SCHEDULE: Complete
TOTAL PROJECT COST: $180,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Supporting other general services.
CONTACT INFORMATION
Project Manager: Sarah Gorman, City Clerk Services Manager Phone:(805) 564-5310
E-mail:[email protected]
*Invoice for services delivered in FY2024 was received after Year End Close. Actual expenditure will be included in adjustments. At the time of this report publication, actuals were $0. Actual Expenditures for FY2024 were $180,000.
12 PROJECT TITLE:
State Street Master Plan
WHY THIS PROJECT?
Successful downtowns require reinvestment over
time. This master planning effort addresses current
economic challenges, builds from past ideas, links
major City work efforts, leverages lessons learned
from the COVID-19 reconfiguration, and implements
our community’s priorities by establishing a new
comprehensive vision with bold strategies and
actionable implementation.
BENEFITS
The State Street Master Plan will benefit residents, visitors, and the local economy through the creation of public space designed for people rather than vehicles. The Master Plan will include a preferred conceptual design concept and implementation plan that the City will use to develop downtown capital improvement projects over a 10-20 year planning period.
QUICK FACTS
LOCATION:
The State Street Master Plan location includes State Street from Sola Street to the 101 underpass and Chapala to
Anacapa Streets.
DESIGN SCHEDULE: 2022-2025
CONSTRUCTION SCHEDULE:
N/A - Specific construction projects along the Master Plan project area will occur based on the Master Plan. The
construction schedule will be determined at the time of specific construction projects and will likely occur between 2025 - 2040.
TOTAL PROJECT COST: Approximately $2,500,000
FUNDING SOURCE: Measure C
COUNCILESTABLISHED PRIORITIES MET
Helping retain local businesses.
CONTACT INFORMATION
Project Manager: Tess Harris, State Street Master Planner Phone:(805) 564-5563
E-mail:[email protected]
State Street Master Plan
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $658,225 $542,837
TOTAL $0 $658,225 $542,837
13 PROJECT TITLE:
Paseo Nuevo Development Evaluation
WHY THIS PROJECT?
This project includes the redevelopment of the Paseo
Nuevo mall into a mixed-use project, including
approximately 500 rental housing units,
approximately 85,000 sf of retail, approximately
96,000 sf of open space, and approximately 600
parking spaces.
BENEFITS
This project aligns with the community interest in redeveloping this site with housing at various levels of affordability. By collaborating with the current lease holder, the City can ensure that redevelopment includes the community's vision for the City Center - a residential mixed-use project with a significant number of housing units.
QUICK FACTS
LOCATION: 651 Paseo Nuevo, Santa Barbara, CA 93101 Street DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: N/A
TOTAL PROJECT COST: $170,040
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Helping retain local businesses.
CONTACT INFORMATION
Project Manager: Tess Harris, State Street Master Planner Phone:(805) 564-5563
E-mail:[email protected]
Paseo Nuevo Development Eval
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $70,531
TOTAL $0 $0 $70,531
14 PROJECT TITLE:
Paving at City Facilities
WHY THIS PROJECT?
Budgetary gap in funding paving and maintenance
and improvements at Facility parking lots and
garages; approximately supports paving
maintenance at 25 sites.
BENEFITS
Improved safety and trip hazards and maintain paving conditions at Facilities parking lots to be consistent with street paving standards.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: Ongoing
FUNDING SOURCE: Measure C, Facilities Capital
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
CONTACT INFORMATION
Project Manager: Meghan Salas
Phone: (805) 564-5568
E-mail: [email protected]
Paving at City Facilities
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Enterprise Funds $304,440 $387,319 $465,001
TOTAL $304,440 $387,319 $465,001
15 PROJECT TITLE:
Public Works Corporate Yard Repave
WHY THIS PROJECT?
Repair dilapidated driveways at City operations yard.
BENEFITS
The preventative maintenance will help ensure the City's asset will be used for years to come.
QUICK FACTS
LOCATION: 425 Laguna St., Santa Barbara, CA., 93101
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $100,000
FUNDING SOURCE: Measure C, Facilities Capital
COUNCIL ESTABLISHED PRIORITIES MET
Police, fire, and 911 emergency medical response.
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
PW Corp Yard Repave
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $182 $0 $0
TOTAL $182 $0 $0
16 PROJECT TITLE:
Pavement Improvements - Overlays Project
WHY THIS PROJECT?
The FY2022 Pavement Maintenance and FY2023
Concrete Repair and Maintenance Projects consist of
grinding off deteriorated asphalt pavement and
overlaying with new asphalt on various high-priority
streets throughout the City, and repairing concrete
curb, gutter, and sidewalks in advance of paving
efforts by both contractors and City crews.
Additionally, the project will construct concrete
improvements including pedestrian access ramps for
compliance with the Americans with Disabilities Act
(ADA) and traffic signal upgrades.
BENEFITS
This project will eliminate minor road defects and structural failures, and create a much smoother road surface, thereby improving road safety. In addition, the project will upgrade pedestrian access ramps to meet ADA requirements, make minor repairs to adjacent sidewalks, curbs and gutters, and repair traffic signals for improved safety and long-term reliability.
QUICK FACTS
LOCATIONS:
FY2022B Locations: Haley Street from Castillo Street to Alisos Street; Chapala Street from Sola Street to Haley Street; Garden Street from Los Olivos Street to Anapamu Street; Olive Street from Sola Street to Ortega Street; Anacapa Street from Cota Street to Gutierrez Street. FY2023C Locations: Upper Mesa, East Mesa, Westside, and Ontare neighborhoods.
Additional work includes traffic signal repairs at the intersection of Shoreline Drive and Loma Alta Drive.
DESIGN
SCHEDULE: FY2022B completed January 2023, FY2023C completed May 2023
CONSTRUCTION
SCHEDULE: FY2022B – spring 2024, FY2023C – summer 2024
TOTAL PROJECT
COST: FY2022B – $13.5 Million, FY2023C – $8.1 Million
FUNDING SOURCE: Measure C, State Gas Tax (SB1), Measure A, Local Surface Transportation Program (LSTP) Grant funds.
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
Helping retain local businesses.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Overlays Project
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C $9,719,524 $8,287,364 $12,738,996
TOTAL $9,719,524 $8,287,364 $12,738,996
17 PROJECT TITLE:
Sidewalk Replacement, Repairs, and Access Ramps
WHY THIS PROJECT?
Provide accessible sidewalks and access ramps for
all users.
BENEFITS
Sidewalk replacement, repairs, and access ramp construction in accordance with the Americans With Disabilities Act (ADA).
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Ongoing
CONSTRUCTION
SCHEDULE: Ongoing
TOTAL PROJECT COST: Over $20,000,000
FUNDING SOURCE: Measure C, Measure A
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
Helping retain local businesses.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Sidewalk Replacement, Repairs, and Access Ramps
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $416,000 $144,000 $718,297
Special Revenue Funds $80,000 $20,000 $7,000
TOTAL $496,000 $164,000 $725,297
18 PROJECT TITLE:
Sidewalk Repairs
WHY THIS PROJECT?
Our annual pavement program is used as an
opportunity to address sidewalk replacement, repairs,
and access ramp construction in accordance with the
Americans With Disabilities Act (ADA).
BENEFITS
Improves pedestrian accessibility and mobility throughout the City with prioritization to areas near medical offices, hospitals, schools, grocery stores, etc.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Ongoing
CONSTRUCTION
SCHEDULE: Ongoing
TOTAL PROJECT COST: $1,150,000 spent annually
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
Helping retain local businesses.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Sidewalk Repairs
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $504,962 $454,895 $599,206
Special Revenue Funds $45,244 $22,321 $44,451
TOTAL $550,206 $477,217 $643,657
19 PROJECT TITLE:
Cliff Drive: Urban Highway Street Transformation
WHY THIS PROJECT?
In 2018, the City adopted a Vision Zero strategy that
aims to prevent severe and fatal injuries on City
streets by focusing resources on high-priority streets
with documented collision patterns. Cliff Drive is the
second-highest priority corridor in the City.
BENEFITS
The Cliff Drive Vision Zero Project addresses the community’s concerns with safety and mobility by removing unnecessary traffic lanes and adding a new three-mile separated path for all ages. The Project provides access to three elementary schools, Santa Barbara City College, parks, neighborhood services, and retail. In addition, it closes the final gap in the 30-mile long Coastal Bike Route from UCSB to Ventura County.
QUICK FACTS
LOCATION: Cliff Drive from Arroyo Burro County Park to Castillo Street DESIGN SCHEDULE: Design Completion: Fall 2026
CONSTRUCTION SCHEDULE: Winter 2027
TOTAL PROJECT COST: $33,000,000
FUNDING SOURCE: Active Transportation Program Grant Grant (80%), Measure C (20%)
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone: (805) 564-5424
E-mail: [email protected]
Cliff Drive: Urban Highway to Complete Street Transformat... 2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Special Revenue Funds $0 $15,797 $564,944
TOTAL $0 $15,797 $564,944
20 PROJECT TITLE:
Drainage Improvements
WHY THIS PROJECT?
The City owns and operates almost 160 miles of
storm drain channels and pipes, many of which are of
unknown size and materials. The City has obtained
inventory and condition data for two priority areas
and is in its third year of the Storm Drain Asset
Management Plan and Capital Improvement
Program. The program will prioritize, and plan storm
drain maintenance, repairs, rehabilitation, and
improvements.
BENEFITS
Flood prevention, protection of property and infrastructure, storm runoff management.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: ongoing
CONSTRUCTION
SCHEDULE: ongoing
TOTAL PROJECT COST: Over $70,000,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Drainage Improvements
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $17,923 $15,976 $574,734
Special Revenue Funds $0 $4,960 $27,510
TOTAL $17,923 $20,936 $602,243
21 PROJECT TITLE:
Westmont Storm Drain
WHY THIS PROJECT?
Damaged drainage area as a result of a January
2017 Storm allowed for improvements including the
regrade the streambed, reorient the inlet to align with the channel flow, install a new headwall, and install a new debris rack at the entrance to the inlet.
BENEFITS
Improves the drainage capacity of the storm drain that flows from north to south immediately east of Westmont Road. The storm drain channel receives water from an unnamed channel that is a tributary to Sycamore Creek.
QUICK FACTS
LOCATION: Unammed channel tributary to Sycamore Creek: Westmont Road at Hwy 192 DESIGN SCHEDULE: Complete
CONSTRUCTION
SCHEDULE: Complete
TOTAL PROJECT COST: $250,000
FUNDING SOURCE: Measure C, FEMA
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Westmont Storm Drain
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $17,454 $30,117 $4,028
Special Revenue Funds $5,330 $0 $0
TOTAL $22,784 $30,117 $4,028
22 PROJECT TITLE:
Drainage: Citywide Drainage Assessment
WHY THIS PROJECT?
The City owns and operates almost 160 miles of
storm drain channels, pipes, culverts, and drains
many of which are of unknown size and materials.
The City has obtained inventory and condition data
for two priority areas and is working on completing a
city-wide assessment in order to develop a Storm
Drain Asset Management Plan and Capital
Improvement Program. The Plan will prioritize storm
drain maintenance, repairs, rehabilitation, and
improvements.
BENEFITS
Development of a comprehensive Storm Drain Asset Management Plan and Capital Improvement Program allows the City to prioritize and plan storm drain maintenance, repairs, rehabilitation, and improvements to reduce the number of emergency repairs and improve the City’s storm drain system.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: ongoing
CONSTRUCTION
SCHEDULE: ongoing
TOTAL PROJECT COST: $2,000,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Drainage: Citywide Drainage Assessment
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $150,679
TOTAL $0 $0 $150,679
23 PROJECT TITLE:
Drainage: Gutierrez Storm Drain Improvements
WHY THIS PROJECT?
Storm water capacity for this low- lying area for the
lower downtown needs to be increased to convey
storm water to the Laguna Channel. Measure C
funds supplement the FEMA grant match which funds
most of the project.
BENEFITS
This Project will improve drainage to the low-lying lower downtown area to reduce flooding during the storm season to City infrastructure and private properties.
QUICK FACTS
LOCATION: East Gutierrez Street between Garden Street and Olive Street DESIGN
SCHEDULE: Complete
CONSTRUCTION
SCHEDULE: Construction completion-January 2025
TOTAL PROJECT
COST: $1.0 Million
FUNDING
SOURCE: Measure C, FEMA Hazard Mitigation Grant
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 24 PROJECT TITLE:
Laguna Pump Station
WHY THIS PROJECT?
The renewal of the Laguna Channel Pump Station
will provide more storm water capacity to the
pumping system and will address many deferred
maintenance issues at the Facility. The Facility is
critical City infrastructure that minimizes the impact of flooding in the low-lying neighborhoods between
Laguna Street and Milpas Street. The Facility was
found to have compromised structural integrity due to
corrosion, cracked concrete, and settlement of
channel walls and building slabs, which reduces the
reliability of the Facility. Measure C funds provide the needed grant match to the approved FEMA funding
for the bulk of the project.
BENEFITS
Improved storm water drainage to the lower downtown area between Laguna Street and Milpas Street and emergency backup of this critical system.
QUICK FACTS
LOCATION: Citywide
DESIGN
SCHEDULE: completed
CONSTRUCTION
SCHEDULE: spring 2024
TOTAL PROJECT
COST: $3,500,000
FUNDING SOURCE: Measure C, FEMA Hazard Mitigation Grant
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Laguna Pump Station
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $80,785 $40,489 $66,729
TOTAL $80,785 $40,489 $66,729
25 PROJECT TITLE:
Traffic Signal Upgrades & Maintenance - Upgrades
WHY THIS PROJECT?
This annual project compliments the annual Traffic
Signal Maintenance project. When major
maintenance work is performed, such as
replacement of underground conduit and wiring, this
is also the best time to upgrade equipment to comply
with modern design standards in terms of placement
and visibility of traffic signals, adding pedestrian
countdown timers where none exist, and adding
accessible pedestrian push buttons.
BENEFITS
This project improves public safety by improving visibility of traffic signals, adding pedestrian countdown timers where none exist, and improving accessibility and mobility for persons with disabilities.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $270,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Police, fire, and 911 emergency.
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Derrick Bailey, Principal Transportation Engineer Phone:(805) 564-5544
E-mail: [email protected]
Traffic Signal Upgrades
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $209,465
TOTAL $0 $0 $209,465
26 PROJECT TITLE:
Traffic Signal Upgrades & Maintenance: Maintenance
WHY THIS PROJECT?
This annual project is necessary to replace aging
traffic signal infrastructure to ensure long-term
reliability. Most work will involve the replacement of
underground conduit and wiring. Many Downtown
traffic signals are over 60 years old, with
underground conduit and wiring that is at risk of
failure. Traffic signal work will be coordinated with
pavement and sidewalk maintenance projects.
BENEFITS
This project maintains public safety by providing long term reliability of the City's traffic signal infrastructure.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Ongoing
CONSTRUCTION
SCHEDULE: Ongoing
TOTAL PROJECT COST: $350,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Police, fire, and 911 emergency.
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Derrick Bailey, Principal Transportation Engineer Phone:(805) 564-5544
E-mail: [email protected]
Traffic Signal Maintenance
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $145,283 $129,643 $511,206
Special Revenue Funds $206,813 $163,817 $153,557
TOTAL $352,096 $293,460 $664,763
27 PROJECT TITLE:
Street Lighting Improvements
WHY THIS PROJECT?
The project provides for the retrofit of existing
streetlighting systems with high efficiency LED
systems, which saves electricity and provides better
light quality. It also funds major repairs to
streetlighting infrastructure damage due to vehicle
collisions.
BENEFITS
These improvements provide better lighting quality in the Public Right of Way and energy savings and related cost savings.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $350,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Shared budget with Streets, Facilities & S&R City Project Manager: Alelia Parenteau,Energy and Climate Program Manager,Phone: (805) 564-5474,E-mail: [email protected] City Project Manager: Derrick Bailey,
Principal Transportation Engineer,
Phone: (805) 564-5544,
E-mail: [email protected] & Meghan Salas - [email protected] Street Lighting Improvements
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $330,325 $223,957 $230,497
TOTAL $330,325 $223,957 $230,497
28 PROJECT TITLE:
Streetlight Maintenance
WHY THIS PROJECT?
This fund supports the repair and maintenance and
replacement of streetlights throughout the city from
various incidents.
BENEFITS
Street lights support public safety.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $100,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Meghan Salas, Facilities Manager
Phone: (805) 564-5583
E-mail:[email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 29 PROJECT TITLE:
Pedestrian Enhancement: Annual Sidewalk Infill
WHY THIS PROJECT?
This annual program is used for smaller sidewalk infill projects that fit within available funding and are likely to be funded through this Sidewalk Infill Program.
The purpose of this project is to improve pedestrian
walkability and accessibility in neighborhoods and
commercial districts.
BENEFITS
This project creates a safer, predictable walking environment by installing sidewalks in gaps between existing walkways, improving pedestrian walkability and accessibility in neighborhoods and commercial corridors.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $20,000,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Pedestrian Enhancement: Annual Sidewalk Infill
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $128,532
TOTAL $0 $0 $128,532
30 PROJECT TITLE:
Active Transporation Projects: State St Undercross at Highway 101 WHY THIS PROJECT?
The U.S. 101 State Street Undercrossing
(Undercrossing) has among the highest
concentrations of serious injuries to pedestrians and
cyclists in the City of Santa Barbara (City). The Vision Zero State Street Undercrossing Project (Project)
connects the City’s two most active transportationoriented neighborhoods: Downtown and the Waterfront.
BENEFITS
The project improves safety and appropriately rebalances space for vehicles, pedestrians, and cyclists through the undercrossing between Yanonali and Gutierrez Streets. The Project will widen sidewalks on each side of the street from eight feet to 15 feet. On-street bike lanes will be increased from five to seven feet in width and will have a two- to three-foot protected buffer. The new roadway configuration includes one vehicle lane in each direction, a painted median for emergency access, and reconfigured turn lanes at both Yanonali and Gutierrez Streets. Additional enhancements include new pedestrian safety lighting and protective railings, reconstructed bridge columns to improve safety and aesthetics, new plantings in the upper planters, irrigation repairs, street tree removal and replacement, and modifications to the intersections at State and Gutierrez Streets and State and Yanonali Streets to reduce crossing distances for pedestrians.
QUICK FACTS
LOCATION: State Street from Yanonali Street to Gutierrez Street DESIGN SCHEDULE: Complete
CONSTRUCTION
SCHEDULE: Construction completion Spring 2025
TOTAL PROJECT COST: $11,000,000
FUNDING SOURCE: Active Transportation Program Grant, Measure C, Streets Fund
COUNCIL ESTABLISHED PRIORITIES MET
Police, fire, and 911 emergency.
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
ATP State Street Undercross @ Hwy101
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $4,969,631
Special Revenue Funds $282,139 $177,615 $582,062
TOTAL $282,139 $177,615 $5,551,694
31 PROJECT TITLE:
De La Vina Street Bridge Replacement Project
WHY THIS PROJECT?
Replacement of a 108-year-old structurally deficient
bridge with reduced hydraulic capacity.
BENEFITS
A new bridge that meets current seismic, safety, and design standards. The Project also includes realigning roadway approaches, abating hazardous building materials, relocating utilities including domestic water and sanitary sewer facilities, constructing channel walls, planting landscape materials, Creek and habitat restoration, and adding storm water treatment facilities.
QUICK FACTS
LOCATION: De La Vina Street and Vernon Street at Mission Creek DESIGN SCHEDULE: Design Completion: Fall 2024
CONSTRUCTION SCHEDULE: Spring 2025
TOTAL PROJECT COST: $20,000,000
FUNDING SOURCE: Federal Highway Administration, Highway Bridge Program (88.53%), Measure C (11.47%)
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone: (805) 564-5424
E-mail: [email protected]
De La Vina Street Bridge Replacement Project
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Special Revenue Funds $3,320,735 $1,418,356 $669,410
TOTAL $3,320,735 $1,418,356 $669,410
32 PROJECT TITLE:
Las Positas Multiuse Pathway
WHY THIS PROJECT?
This project constructed a 2.6-mile-long separated
pathway for bicyclists, runners, and pedestrians of all ages and abilities along two high speed arterials –
Las Positas Road and Modoc Road. The project
removed a significant safety barrier along the Pacific
Coastal Bike Route and the Crosstown Bike Route
and is an important part of a larger planned network
of safe bike routes for all ages and abilities that will extend from UCSB and Goleta to the west, into
Ventura County to the east.
BENEFITS
The project improved safety for all modes of transportation along these corridors, implemented strategic traffic calming measures, habitat restoration, storm water treatment, and improved accessibility to public amenities adjacent to the corridor, including Elings Park, Hendry's Beach, and City-owned open space.
QUICK FACTS
LOCATION: Modoc Road from Calle De Los Amigos to Las Positas Road, and Las Positas Road from Modoc Road to Cliff Drive.
DESIGN
SCHEDULE: completed spring 2020
CONSTRUCTION
SCHEDULE: completed fall 2022
TOTAL PROJECT
COST: $18,000
FUNDING
SOURCE: Measure C, Active Transportation Program Grant
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATON
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Las Positas Multiuse Pathway
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Las Positas Multiuse City Match $6,362,995 $919,093 $210,957 TOTAL $6,362,995 $919,093 $210,957
33 PROJECT TITLE:
Modoc Multiuse Path Extension
WHY THIS PROJECT?
The County of Santa Barbra constructed a Class I
multiuse path from Via Senda to the City/County line
leaving a gap between the County path and the City's
newly constructed Las Positas Multiuse Path. This
project closes the gap between Calle De Los Amigos
and the County.
BENEFITS
This project will build approximately 600 linear feet of multiuse path south of Modoc Road connecting the City of Santa Barbara's existing Las Positas and Modoc Multiuse Path to Santa Barbara County's Multiuse Path that is currently under construction.
QUICK FACTS
LOCATION: Modoc Road from the City/County line to Calle De Los Amigos DESIGN SCHEDULE: Completed October 2022
CONSTRUCTION
SCHEDULE: Completed March 2024
TOTAL PROJECT COST: $815,000
FUNDING SOURCE: Measure C, Measure A Grant
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
Modoc Multiuse Path Extension
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $37,468 $293,464 $214,735
Special Revenue Funds $0 $195,248 $247,080
TOTAL $37,468 $488,712 $461,815
34 PROJECT TITLE:
Traffic Management System
WHY THIS PROJECT?
The 1990's era central traffic signal system is no
longer supported by the vendor. Failure would result
in a loss of synchronization of traffic signals and loss of ability to adjust traffic signal timing. The project also includes replacement of 1970's to 1990's era
traffic signal controllers.
BENEFITS
Maintain synchronization of traffic signals and ability to adjust traffic signal timing to meet traffic demands and long-term reliability of traffic signal equipment.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $350,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Police, fire, and 911 emergency medical response.
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Derrick Bailey, Acting Streets Operations and Infrastructure Manager Phone:(805) 564-5544
E-mail: [email protected]
Traffic Management System
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $59,872 $266,835
TOTAL $0 $59,872 $266,835
35 PROJECT TITLE:
Street Lighting Improvements & Maintenance: HSIP West Carrillo WHY THIS PROJECT?
The Highway Safety Improvement Program (HSIP)
West Carrillo Lighting and Signal Upgrade and
Overlay Project (Project) was identified as part of the City’s annual collision analysis and is located along
the Carrillo Street Vision Zero Priority Corridor where there are high concentrations of fatal and severe
traffic collisions. A review of the collisions along the West Carrillo Street corridor revealed that there is a
high frequency of injury related crashes occurring at
night, and a pattern of broadside collisions at the
intersection of Carrillo Street and San Andres Street.
BENEFITS
The Project includes countermeasures to address the identified pattern of collisions and to provide accessibility improvements through the Carrillo Street corridor.
QUICK FACTS
LOCATION: West Carrillo Street: San Andres Street to Chapala Street DESIGN SCHEDULE: Complete
CONSTRUCTION
SCHEDULE: Complete
TOTAL PROJECT COST: $3,800,000
FUNDING SOURCE: Highway Safety Improvement Program, Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Laura Yanez, Principal Engineer
Phone:(805) 564-5424
E-mail: [email protected]
HSIP W Carrillo Light & Signal Upgrade
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $1,446,967 $98,754 $0
Special Revenue Funds $1,432,884 $68,436 $0
TOTAL $2,879,851 $167,189 $0
36 PROJECT TITLE:
Carrillo Gymnasium Renovation
WHY THIS PROJECT?
Designed by renowned architect Julia Morgan, the
Carrillo Gymnasium is designated a City Landmark.
This stucco-finished building needs exterior structural repairs, waterproofing, and window replacement to
continue to serve the recreational needs of Santa
Barbara.
BENEFITS
The overall project goal is to halt the broad degradation of the building by addressing and repairing the root causes. Work will include exterior concrete and stucco repairs, window repair and replacement, and exterior waterproofing. Additionally, the building will receive a seismic assessment to identify any major structural issues.
QUICK FACTS
LOCATION: Carrillo Gymnasium, 114 East Carrillo Street
DESIGN SCHEDULE: completed winter 2022
CONSTRUCTION
SCHEDULE: TBD
TOTAL PROJECT COST: $2.64 Million
FUNDING SOURCE: Measure C (FY2021–2023)
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
Carrillo Gym Renovation
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $112
TOTAL $0 $0 $112
37 PROJECT TITLE:
Carrillo Gym Renovation - Minor Renewal
WHY THIS PROJECT?
This minor renewal is part of Carrillo Gym
Renovation, which aims to repair the exterior of the
historic building to make it watertight and renew the
aesthetic components to its original design intent.
BENEFITS
Repairs a City asset and preserves a historic building while conditioning it for future programming.
QUICK FACTS
LOCATION: 100 E Carrillo St., Santa Barbara, CA. 93101
DESIGN SCHEDULE: Complete
CONSTRUCTION
SCHEDULE: May 2025
TOTAL PROJECT COST: Included in Carrillo Gym Renovation, which has an approximate budget of $2,800,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager:Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail: [email protected]
Carrillo Gym Minor Renewal
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $21,496 $1,477 $1,854
TOTAL $21,496 $1,477 $1,854
38 PROJECT TITLE:
City Hall Plumbing and Restroom Upgrades
WHY THIS PROJECT?
Upgrades are needed for the second-floor restrooms
at City Hall, as well as the general plumbing in the
building. Both the water distribution system and the
drainage system have exceeded their serviceable life
and require either repairs or replacements. The
restrooms require reconfiguration for compliance with
the Americans with Disabilities Act (ADA).
BENEFITS
New plumbing fixtures and water supply lines will be installed, and the renovated restrooms will provide accessible facilities to the public and employees. This project will be constructed with the City Hall Elevator Replacement.
QUICK FACTS
LOCATION: City Hall, 735 Anacapa Street
DESIGN
SCHEDULE: summer 2020
CONSTRUCTION
SCHEDULE: TBD
TOTAL PROJECT
COST: $75,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Helping retain local businesses.
CONTACT INFORMATION
Project Manager: Adam Hendel, Acting Facilities & Fleet Manager Phone:(805) 564-5568
E-mail:[email protected]
City Hall Plumbing and Restroom Upgrades
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $7,626 $8,700 $853
TOTAL $7,626 $8,700 $853
39 PROJECT TITLE:
2023 Storm Remediation - Purchasing and Parks & Recreation Buildings WHY THIS PROJECT?
Repair damage incurred from storm event in
December 2023 and complete preventive work that is
not covered by insurance. This work totaled $9,679 in
Fiscal Year 2024.
Further damage repairs, including mold remediation,
totaled $459,955 with an additional $50,662
encumbered in Fiscal Year 2024. The City expects
these amounts to be reimbursed by insurance in
Fiscal Year 2025.
For clarity of full project costs, all expenditures were charged to Measure C with expectation of
reimbursement to offset costs.
BENEFITS
Repairs City assets incurred form a storm event in December 2023 and mitigates future storm damages.
QUICK FACTS
LOCATION: 620 Laguna St & 310 E Ortega St, Santa Barbara, CA. 93101 DESIGN SCHEDULE: Complete
CONSTRUCTION SCHEDULE: October 2024
TOTAL PROJECT COST: Approximately $350,000
FUNDING SOURCE: Measure C, Insurance Reimbursement
COUNCIL ESTABLISHED PRIORITIES MET
Supporting other general services.
CONTACT INFORMATION
Project Manager: Donna Lahey, PW Ops Manager
Phone: (805) 897-2645
E-mail: [email protected]
2023 Storm Remediation + Reimbursable Costs
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital
Measure C $0 $0 $469,634
MEASURE C - CAPITAL TOTAL $0 $0 $469,634
TOTAL $0 $0 $469,634
40 PROJECT TITLE:
Facilities Master Plan
WHY THIS PROJECT?
The majority of these buildings were constructed in
the 1970s and have been renovated multiple times to
meet changing needs. As City operations expand and
space becomes more critical, the City needs to
consider consolidating operations and other
measures to maximize space efficiency. Except for
the 630 Garden Street building, all other buildings are single level.
Initiative to improve asset management of Facilities
through needs conditions assessment and improved
asset management software.
BENEFITS
The first phase of this project assesses the current and future needs of the City. The second phase consists of an analysis of alternative solutions, final recommendations, and a roadmap on how to meet the goals of the Capital Improvement Program.
Improved asset management.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: Ongoing
CONSTRUCTION
SCHEDULE: Ongoing
TOTAL PROJECT COST: $157,818
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Meghan Salas
Phone: (805) 564-5583
E-mail:[email protected]
Facilities Master Plan
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $48,640 $42,116 $539
TOTAL $48,640 $42,116 $539
41 PROJECT TITLE:
Facilities Renewal, HVAC Maintenance & Replacement
WHY THIS PROJECT?
Recurring annual project to cover the annual
maintenance and replacement needs of heating,
ventilation, and air conditioning (HVAC) equipment in
General Fund buildings.
BENEFITS
Allows City's assets to function efficiently and be replaced with more efficient units that in alignment with the City's adopted Energy and Climate Policies.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $300,000
FUNDING SOURCE: Measure C, Facilities Capital
COUNCIL ESTABLISHED PRIORITIES MET
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Joe Gonzales, Facilities Maintenance Supervisor Phone:(805) 897-1932
E-mail: [email protected]
Facilities Renewal, HVAC Maintenance & Replacement
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Internal Services Funds $114,981 $145,770 $0
Measure C - Capital $0 $0 $200,072
TOTAL $114,981 $145,770 $200,072
42 PROJECT TITLE:
Facilities Renewal, Flooring, Paint, and Finishes
WHY THIS PROJECT?
Annual fund to help support maintenance and repair
issues around City facilities.
BENEFITS
Help support various City facilities that are in need of repair, replacement, or maintenance due to various reasons.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $100,000
FUNDING SOURCE: Measure C, Facilities Capital
COUNCIL ESTABLISHED PRIORITIES MET
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail: [email protected]
Facilities Renewal, Flooring, Paint, and Finishes
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Internal Services Funds $96,113 $29,071 $54,296
TOTAL $96,113 $29,071 $54,296
43 PROJECT TITLE:
Facilities Renewal, Building Security Upgrades
WHY THIS PROJECT?
This fund allows for increased security measures for
various City buildings.
BENEFITS
Increased safety for City staff and public visitors.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: November 2024
CONSTRUCTION SCHEDULE: May 2025
TOTAL PROJECT COST: $150,000
FUNDING SOURCE: Measure C, Facilities Capital
COUNCIL ESTABLISHED PRIORITIES MET
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail: [email protected]
Facilities Renewal, Building Security Upgrades
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Internal Services Funds $19,342 $53,697 $6,801
TOTAL $19,342 $53,697 $6,801
44 PROJECT TITLE:
Facilities Renewal, Annual Sewer Lateral Repair
WHY THIS PROJECT?
Annual effort to repair and replace sewer lateral
infrastructure in General Fund buildings. This is in
response to the City's Sewer Lateral Inspection
Program (SLIP).
BENEFITS
The replacement(s) will increase the reliability of sewer laterals and connections to the City's main sewer lines.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $20,000
FUNDING SOURCE: Measure C, Facilities Capital
COUNCIL ESTABLISHED PRIORITIES
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Joe Gonzales, Facilities Maintenance Supervisor Phone:(805) 897-1932
E-mail: [email protected]
Facilities Renewal, Annual Sewer Lateral Repair
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Internal Services Funds $7,813 $33,264 $9,204
TOTAL $7,813 $33,264 $9,204
45 PROJECT TITLE:
Facilities Renewal, Miscellaneous Minor Facilities Projects WHY THIS PROJECT?
Annual fund to help maintain and upgrade City
facilities to meet current code, effective programming
capabilities.
BENEFITS
City assets are upgraded for programming use in various buildings as well as upgrades to help meet minimum working conditions.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $550,000
FUNDING SOURCE: Measure C, Facilities Capital
COUNCIL ESTABLISHED PRIORITIES MET
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail: [email protected]
Facilities Renewal, Miscellaneous Minor Facilities Projects 2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $183,668 $497,687
TOTAL $0 $183,668 $497,687
46 PROJECT TITLE:
Minor Renewal - Los Baños Building
WHY THIS PROJECT?
Paint exterior of the City asset while repairing minor
damages to minimize the potential for larger future
repairs.
BENEFITS
The preventative maintenance will help ensure the City's asset will be used for years to come.
QUICK FACTS
LOCATION: 401 Shoreline Dr., Santa Barbara, CA., 93109
DESIGN SCHEDULE: Complete
CONSTRUCTION
SCHEDULE: November 2025
TOTAL PROJECT COST: Approximately $128,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager:Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
Minor Renewal - Los Baños Building
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $3,000 $134,745
TOTAL $0 $3,000 $134,745
47 PROJECT TITLE:
Minor Renewal - Fire Stations: Station 6
WHY THIS PROJECT?
Repair dilapidated training facility.
BENEFITS
Supports the City's first responders to stay healthy and ready for any incidents that occur in the city.
QUICK FACTS
LOCATION: 1802 Cliff Drive
DESIGN SCHEDULE: December 2024
CONSTRUCTION
SCHEDULE: May 2025
TOTAL PROJECT COST: $190,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Police, fire, and 911 emergency medical response.
Maintaining neighborhood fire stations.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 48 PROJECT TITLE:
Minor Renewal - La Mesa Park Restroom
WHY THIS PROJECT?
The restroom in La Mesa Park is in need of
accessibility improvements, interior remodel and a
new roof and lighting updates.
BENEFITS
La Mesa Park is a highly utilized City Park for families and celebrations.
QUICK FACTS
LOCATION: Shoreline Drive
DESIGN SCHEDULE: 2024
CONSTRUCTION SCHEDULE: 2025
TOTAL PROJECT COST: $180,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Keven Strasburg, Project Engineer
Phone:(805) 897-1906
E-mail: [email protected]
Minor Renewal-La Mesa Park Res
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $400
TOTAL $0 $0 $400
49 PROJECT TITLE:
Minor Renewal - Municipal Tennis Court Building
WHY THIS PROJECT?
The purpose of this project is for the minor renewal of the Municipal Tennis Court Building. Work includes
upgraded restrooms, lighting upgrades, windows and
door replacements, and roof repairs.
BENEFITS
This project will eliminate deferred maintenance, protect the building envelope, and provide upgraded restrooms.
QUICK FACTS
LOCATION: Municipal Tennis and Pickleball Courts, 1414 Park Place DESIGN
SCHEDULE: Completion Fall 2022
CONSTRUCTION
SCHEDULE: TBD
TOTAL PROJECT
COST: $160,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Community projects to support the City's parks & library.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
Minor Renewal - Muni Tennis Building
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $24,127 $39,740
TOTAL $0 $24,127 $39,740
50 PROJECT TITLE:
Minor Renewal - 630 Garden Building
WHY THIS PROJECT?
This project will repair and upgrade the Gebhard
Room to support increased functionality.
BENEFITS
The repair and upgrade of the Gebhard Room enhances community engagement while providing a safe, attractive, and functional space for meetings.
QUICK FACTS
LOCATION: 630 Garden St (Community Development), Santa Barbara, CA., 93101 DESIGN
SCHEDULE: December 2024
CONSTRUCTION
SCHEDULE: May 2025
TOTAL PROJECT
COST: Approximately $139,000
FUNDING
SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Updating public safety infrastructure.
Supporting other general services.
CONTACT INFORMATION
Project Manager:Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
Minor Renewal-630 Garden Build
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $4,782 $15,809 $0
TOTAL $4,782 $15,809 $0
51 PROJECT TITLE:
630 Garden Building Office Improvements
WHY THIS PROJECT?
This project will add additional workspaces to
accommodate the space needs of newly added
positions. Additionally, the project will provide
department staff with an improved work environment
and create a more desirable in-office work
experience.
BENEFITS
Increases functionality of the work environment of the building.
QUICK FACTS
LOCATION: 630 Garden St (Community Development), Santa Barbara, CA., 93101
DESIGN SCHEDULE: November 2024
CONSTRUCTION SCHEDULE: January 2025
TOTAL PROJECT COST: $120,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Supporting other general services.
CONTACT INFORMATION
Project Manager: James Hamilton, Comm Dev Business Manager Phone: (805) 564-5504
E-mail: [email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 52 PROJECT TITLE:
PD Annex
WHY THIS PROJECT?
This project upgraded and renovated the detective
offices.
BENEFITS
This project supported the increased programming needs of the Police Department.
QUICK FACTS
LOCATION: 222 E Anapamu St., Santa Barbara, CA., 93101
DESIGN SCHEDULE: Complete
CONSTRUCTION SCHEDULE: Complete
TOTAL PROJECT COST: Approximately $100,000
FUNDING SOURCE: Measure C, Facilities Capital
COUNCIL ESTABLISHED PRIORITIES MET
Police, Fire, and 911 emergency medical response.
CONTACT INFORMATION
Project Manager:Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
PD Annex - Measure C
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $2,537,035 -$293
General Fund-Capital $0 $1,665,365 -$195
TOTAL $0 $4,202,400 -$488
53 PROJECT TITLE:
Eastside Library Construction - Garage
WHY THIS PROJECT?
This project will serve as the main garage for the
"Library On The Go" electric van(s)
BENEFITS
This projects supports the Library programming and the needs of the community by allowing a secure area to charge the vehicle(s), load & unload material, store resources, and help protect City assets.
QUICK FACTS
LOCATION: 1102 E Montecito St, Santa Barbara, CA., 93103 DESIGN SCHEDULE: June 2025
CONSTRUCTION SCHEDULE: N/A
TOTAL PROJECT COST: $150,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 54 PROJECT TITLE:
Library Technology Replacement
WHY THIS PROJECT?
The Library has numerous technology assets with
many items nearing end of life. Replacements are
needed for both small and large equipment to
maintain critical Library operations and provide
necessary technology for quality programming and
outreach.
BENEFITS
This project allows the Library to efficiently plan and prioritize technology replacement for operational needs and user demands, while also limiting downtime due to equipment failure.
QUICK FACTS
LOCATION: 40 E Anapamu St, Santa Barbara, CA 93101
DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: N/A
TOTAL PROJECT COST: $187,450
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITES MET
Supporting other general services.
CONTACT INFORMATION
Project Manager: Kristina Hernandez, Library Services Manager Phone:(805) 564-5601
E-mail:[email protected]
Library Technology Replacement
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $175,612
TOTAL $0 $0 $175,612
55 PROJECT TITLE:
Central Library Lower-Level Workspace Renovation
WHY THIS PROJECT?
The Central Library lower-level workspace serves as
a non-public staff area accommodating multiple
workgroups and functions including Technology
Services, Patron Services, Librarians, Technical
Services, Youth Services, and Outreach. It is the area
where all materials and supplies are received and
processed and the planning space for Library
services and programs. There have been no
significant updates since 1980 and upgrades are
needed to improve workflow efficiencies.
BENEFITS
Library operations have changed drastically over the last 35 years and the new design to the workspace includes ergonomic workstations, increased storage, improved lighting, and Americans with Disabilities Act (ADA) accessibility. The space allows for increased collaboration when needed and incorporates workflow efficiencies that lead to improved productivity and customer service.
QUICK FACTS
LOCATION: Central Library, 40 East Anapamu Street
DESIGN
SCHEDULE: completed 2019
CONSTRUCTION
SCHEDULE: summer 2022 – fall 2024
TOTAL PROJECT
COST: $3.4 Million
FUNDING SOURCE: Measure C, General Fund Capital
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager:Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
Central Library Staff Workspace Reno
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $1,647,665 $1,054,537
General Fund-Capital $4,995 $27,045 $62,079
TOTAL $4,995 $1,674,710 $1,116,617
56 PROJECT TITLE:
Central Library Lobby Update
WHY THIS PROJECT?
Update lobby to allow for increased programming
and security needs.
BENEFITS
Corrects current accessibility, communication, and security issues.
QUICK FACTS
LOCATION: 40 E Anapamu St, Santa Barbara, CA 93101
DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: May 2025
TOTAL PROJECT COST: $200,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Supporting other general services.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 57 PROJECT TITLE:
Library Plaza Renovation
WHY THIS PROJECT?
The current design of the Central Library Plaza is a
challenge to maintain and the various walls, hedges,
and ground levels have given rise to numerous
security issues. Deferred maintenance of crumbling
walls and lifting concrete pathways pose significant
risks and the lack of Americans with Disabilities Act
(ADA) access is a safety concern.
The project scope includes the renovation of the
existing plaza which includes fully accessible routes,
increased programming space, and improved
security measures.
BENEFITS
The construction of a newly redesigned Central Library Plaza will allow the City to make the Library Plaza a prominent public space that is a safe and attractive gathering space for residents of Santa Barbara. Beyond improved aesthetics, there will be opportunities for public events, reduced maintenance costs, and reduced use of water resources. Sustainability elements will be incorporated as well as improved ADA access on the entire grounds.
This project supports the community at large by offering a more welcoming environment, increased programming capabilities, increased accessibility measures, and a safer space for the public to visit.
QUICK FACTS
LOCATION: Central Library, 40 East Anapamu Street
DESIGN SCHEDULE: Complete
CONSTRUCTION SCHEDULE: October 2024
TOTAL PROJECT COST: $5.0 Million
FUNDING SOURCE: Measure C, Private Funding
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager:Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
Library Plaza Renovation
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $21,525 $1,638,180 $2,094,180
Special Revenue Funds $0 $2,152,341 $512,311
TOTAL $21,525 $3,790,521 $2,606,491
58 PROJECT TITLE:
Central Library Historic Doors and Tympanum
WHY THIS PROJECT?
Repair historic entry doors at the Central Library.
BENEFITS
The scope includes the repair and restoration of historic features on the Central Library including reparing the original exterior doors, restoring the original paint design above the Faulkner Gallery, and restoration of the Tympanum of the original main entry to the Central Library.
QUICK FACTS
LOCATION: 40 E. Anapamu St., Santa Barbara, CA., 93101
DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: October 2024
TOTAL PROJECT COST: $250,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Supporting other general services.
CONTACT INFORMATION
Project Manager: Kristina Hernandez, Library Services Manager Phone:(805) 564-5601
E-mail:[email protected]
Central Library Historic Doors and Tympanum
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $3,198
TOTAL $0 $0 $3,198
59 PROJECT TITLE:
Central Library Faulkner Gallery Renovation: Interior
WHY THIS PROJECT?
Update and replace deteriorating finishes throughout
the galleries.
BENEFITS
Increases and supports the functionality and availability of Library programming as well as other public and private groups events.
QUICK FACTS
LOCATION: 40 E. Anapamu St., Santa Barbara, CA., 93101
DESIGN SCHEDULE: Complete
CONSTRUCTION SCHEDULE: September 2024
TOTAL PROJECT COST: Approximately $300,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
Supporting other general services.
Community projects to support teh City's parks and library.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail: [email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 60 PROJECT TITLE:
Central Library Faulkner Gallery Renovations: AV Equipment Upgrade WHY THIS PROJECT?
The Faulkner Gallery equipment is outdated and
increasingly becoming obsolete. Staff cannot
accommodate all needs for quality sound and A/V,
including those of other City Departments who wish
to utilize the space to host various public City
advisory group meetings. The upgrades to the
system would include the modernization of the
audio/visual equipment.
BENEFITS
The upgrade of the audio/visual equipment in the Faulkner Gallery would improve Library programs for all ages and allow the Library to meet the streaming needs of groups who wish to stream/televise their meeting or event, such as public City advisory group meetings. Improved A/V quality would also increase room rental requests.
QUICK FACTS
LOCATION: 40 E Anapamu St, Santa Barbara, CA 93101
DESIGN SCHEDULE: Near completion
CONSTRUCTION SCHEDULE: Fall 2024
TOTAL PROJECT COST: $145,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Supporting other general services.
Community projects to support the City's parks and library.
CONTACT INFORMATION
Project Manager: Kristina Hernandez, Library Services Manager Phone:(805) 564-5601
E-mail:[email protected]
Central Library Faulkner Gallery AV Equipment Upgrade
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $18,000
TOTAL $0 $0 $18,000
61 PROJECT TITLE:
Central Library Faulkner Gallery Renovations: Exterior Doors WHY THIS PROJECT?
The Faulkner Gallery doors date back to 1930. The
Faulkner Gallery was designed by the prestigious
and noted architect, Myron Hunt, known for many
important Southern California buildings, including the
Huntington mansion and Huntington Library. The
doors have remained untouched since the 1930
opening and are in need of restoration.
BENEFITS
Construction of the Library Plaza is underway. Restoration of the Faulkner Gallery doors will complement the project as it holds a prominent location in the newly redesigned Library Plaza. Restoration also demonstrates Santa Barbara's commitment to celebrating the past while preserving the architecture of this historic and landmarked building.
QUICK FACTS
LOCATION: 40 E Anapamu St, Santa Barbara, CA 93101
DESIGN SCHEDULE: Complete
CONSTRUCTION SCHEDULE: Fall 2024 - Near completion
TOTAL PROJECT COST: $125,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Supporting other general services.
Community projects to suppoert the City's parks and library.
CONTACT INFORMATION
Project Manager: Kristina Hernandez, Library Services Manager Phone:(805) 564-5601
E-mail:[email protected]
Central Library Exterior Faulkner Doors
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $61,188
TOTAL $0 $0 $61,188
62 PROJECT TITLE:
Central Library Americans with Disabilities Act (ADA) Elevator WHY THIS PROJECT?
The existing elevator is not compliant with the
Americans with Disabilities Act (ADA) requirements.
The new elevator will comply with all regulations and
allow for full access to all three floors. The elevator will feature a glass enclosure and will display locally sourced artwork.
BENEFITS
The elevator will be located within the central part of the library. This will allow for improved circulation throughout the building and convenient access to all designated spaces. Half of the existing staircase will be removed to make room for the new elevator. A highlight of the new elevator is a glass enclosure to complement the existing atrium. The current handrails will also be replaced with glass elements to match the new elevator and existing staircase to the Children’s Library.
QUICK FACTS
LOCATION: Central Library, 40 East Anapamu Street
DESIGN SCHEDULE: fall 2021
CONSTRUCTION
SCHEDULE: summer 2022 – winter 2024
TOTAL PROJECT COST: $2.5 Million
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager:Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
Central Library ADA Elevator
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $23,666 $697,669 $965,456
TOTAL $23,666 $697,669 $965,456
63 PROJECT TITLE:
Central Library Roof Terrace Renovation
WHY THIS PROJECT?
Repair and waterproof roof terrace that is currently
leaking.
BENEFITS
Repairs the existing leaks in the roof terrace above the lobby and allows for a more functional exterior space.
QUICK FACTS
LOCATION: 40 E. Anapamu St., Santa Barbara, CA., 93101
DESIGN SCHEDULE: N/A
CONSTRUCTION SCHEDULE: May 2025
TOTAL PROJECT COST: $200,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
Supporting other general services.
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail: [email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 64 PROJECT TITLE:
Central Library Upper-Level Needs Assessment
WHY THIS PROJECT?
There has been a shift in the way teens and adults
are using library spaces with the role of the Library
expanding beyond traditional book lending. An
assessment of the upper-level space is needed to
address new and innovative pathways of learning
and reinvent spaces and services to foster
community engagement.
BENEFITS
A needs assessment would lead to a community-centered space that is designed to address the needs of library users such as mobile shelving that allow for a flexible programming space, conference and group study spaces that support both collaborative and traditional individual research, creation spaces, and a dedicated teen space. Potential rental spaces such as a kitchen and various sized meeting rooms would also be identified.
QUICK FACTS
LOCATION: Central Library, 40 East Anapamu Street
DESIGN SCHEDULE: Fall 2023
CONSTRUCTION SCHEDULE: TBD
TOTAL PROJECT COST: $150,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager:Kristina Hernandez, Library Services Manager Phone:(805) 564-5601
E-mail:[email protected]
Central Library Upper-Level Needs Assessment
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $751 $0 $0
TOTAL $751 $0 $0
65 PROJECT TITLE:
Louise Lowry Davis Renovation
WHY THIS PROJECT?
The Louise Lowry Davis Center is a designated
historic building and is long overdue for a renovation.
This is a planned, two-phase renovation. Phase I
contains exterior improvements, which includes
creating a new front entrance. Phase II is an interior
renovation and is awaiting future funding. Each
phase updates its respective area to meet current
accessibility standards.
BENEFITS
This project includes new site plumbing and LED lighting. Low water use landscape and new shade structures combine with a reimagined and regraded south terrace to more closely join the interior with the exterior., Impermeable areas have been replaced with permeable pavers to allow onsite storm water filtration.
QUICK FACTS
LOCATION: Louise Lowry Davis Center, 1232 De la Vina Street DESIGN SCHEDULE: Completed Winter 2021
CONSTRUCTION SCHEDULE: Fall 2021-Fall2025
TOTAL PROJECT COST: $730,000
FUNDING SOURCE: Measure C, CDD Block Grant
COUNCIL ESTABLISHED PRIORITIES
Maintenance of City Buildings
CONTACT INFORMATION
Project Manager: Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page.
Louise Lowry Davis Renovation
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $332,047 $55,198 $359,727
General Fund-Capital $15,502 $0 $0
TOTAL $347,550 $55,198 $359,727
66 PROJECT TITLE:
Dwight Murphy Field Renovation
WHY THIS PROJECT?
Acquired in 1925, Dwight Murphy Field has served as
Santa Barbara’s only regulation- size soccer facility
for 95 years. Despite its importance as a sports
facility, the park has not received any significant
upgrades in over 50 years. The Project will address
outdated and poorly performing facilities in need of
significant reinvestment. This will increase play
opportunities for youth and families, and address
accessibility and park safety.
BENEFITS
Developed through a community master planning process, the project will complete a full-scale rehabilitation of existing park amenities, including the multi-sport field, natural turf field, fitness area, playground, restrooms, parking, field, and site lighting, landscaping, and access into and through the park. The Project will also provide street, right-of-way improvements on Niños Drive and Por La Mar Drive and will include improved circulation and parking. Conversion of the natural turf to a synthetic field will allow for year-round use and installation of an inclusive playground that will address an unmet need by providing access to play for youth of all abilities, the enlarged outdoor fitness area, youth baseball field, improved parking, and new restroom.
These amenities will ensure the park serves a broad cross-section of the community. Improved access, circulation, and lighting will improve park safety.
QUICK FACTS
LOCATION: Dwight Murphy Field (acquired in 1925), 501 Niños Drive DESIGN SCHEDULE: 2019-2024
CONSTRUCTION SCHEDULE: 2025
TOTAL PROJECT COST: $24,000,000
FUNDING SOURCE: Measure C, Multiple sources, including the Gwendolyn Strong Foundation and Federal grants
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Jill Zachary,Parks and Recreation Director, Phone: (805) 564-5431
E-mail: [email protected]
Dwight Murphy Field Renovation
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $159,154 $141,428 $188,125
General Fund-Capital $18 $11,018 $108,405
TOTAL $159,172 $152,446 $296,530
67 PROJECT TITLE:
Cabrillo Pavilion Renovation - Loan Repayment
WHY THIS PROJECT?
Loan repayment for Cabrillo Pavilion Renovation
Project, which was the complete renovation of the
mechanical, electrical, plumbing, fire protection, and
communication systems, and structural, seismic, and
accessibility upgrades., Exterior building
improvements included restoration of the promenade
and façade, and renovations to the site landscaping,
outdoor showers, and covered walkway, also known
as a “stoa,” which is adjacent to the playground.
BENEFITS
These improvements will enable the City to increase and enhance recreational programming for adults and youth, achieve a modern social event center, and support beach activities. The facility will be more usable, accessible, comfortable and safe, and serve as a, year-round community hub.
QUICK FACTS
LOCATION: 1118 East Cabrillo between Ninos Drive and Corona Del Mar Drive
DESIGN SCHEDULE: Completed
CONSTRUCTION SCHEDULE: Completed
TOTAL PROJECT COST: $16,700,000
FUNDING SOURCE: Measure C, Multiple sources, including the majority of funding from Redevelopment agency Bond proceeds
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Jill Zachary,Parks and Recreation Director, Phone: (805) 564-5431
E-mail: [email protected]
Cabrillo Pavilion Renovation - Loan Repayment
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
General Fund-Capital $0 $33,251 $99,345
Measure C - Capital $41,616 $42,448 $32,000
General Fund $0 $0 $660
TOTAL $41,616 $75,700 $132,006
68 PROJECT TITLE:
Ortega Park Renovation
WHY THIS PROJECT
Ortega Park, established in 1930, has not received
reinvestment for 70+ years.
BENEFITS
The Project will complete a full-scale rehabilitation of the 5.46-acre Ortega Park with a synthetic turf field, new year-round pool that provides for instruction, lap swimming, aqua programs and children’s slide and splash play features, new park restroom facilities, enhanced community building, new playground and family picnic area, community gathering areas, basketball court, all-wheel court, walking paths, trees and landscaping. The park will include the relocation and/or revisioning of 12 of the murals in the park today, and opportunity for 12 new murals. The project includes site access and circulation improvements with pedestrian pathways surrounding and through the park, accessible entries and expanded street parking. The Project also includes street right of way improvements.
QUICK FACTS
LOCATION: Ortega/Cota/Salsipuedes Streets
DESIGN SCHEDULE: 2018-2025
CONSTRUCTION SCHEDULE: TBD
TOTAL PROJECT COST: TBD
FUNDING SOURCE: Measure C, Grants
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youths, and senior services.
CONTACT INFORMATION
Project Manager: Justin Van Mullen
Phone: (805) 897-1972
E-mail: [email protected]
Ortega Park Renovation
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $54,715 $115,258 $93,539
General Fund-Capital $5,054 $30,392 $30,775
TOTAL $59,770 $145,649 $124,314
69 PROJECT TITLE:
Shoreline Park Safety Improvements
WHY THIS PROJECT?
Shoreline Park suffers from periodic coastal bluff
erosion due to storm events and storm water runoff
from the surrounding neighborhood. Bluff erosion
impacts park fencing and walkways.
BENEFITS
The project will replace lost sidewalk and damaged fencing increasing site safety and accessibility.
QUICK FACTS
LOCATION: Shoreline Drive
DESIGN SCHEDULE: 2024
CONSTRUCTION SCHEDULE: 2024
TOTAL PROJECT COST: $150,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Justin Van Mullem, Capital Projects Supervisor Phone: (805) 897-1972
E-mail: [email protected]
Shoreline Park Safety Improvement
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $1,913
TOTAL $0 $0 $1,913
70 PROJECT TITLE:
Moreton Bay Fig Tree
WHY THIS PROJECT?
The Moreton Bay Fig Tree was planted in 1867.
Located adjacent to the train station, the tree root
system is subject to human abuse and degradation.
BENEFITS
This project will protect the tree with a fence designed to also ensure public enjoyment of the tree and access to the surrounding turf area.
QUICK FACTS
LOCATION: Santa Barbara Train Station
DESIGN SCHEDULE: 2024-2025
CONSTRUCTION SCHEDULE: 2025
TOTAL PROJECT COST: $200,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Sean Stewart, Project Planner
Phone: (805) 897-1976
E-mail: [email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 71 PROJECT TITLE:
Urban Forest Management Plan Implementation
WHY THIS PROJECT?
The City has more than 27,000 street trees within
street right-of-ways. Most of the City’s streets in need of infrastructure maintenance also requires tree
maintenance. This includes root pruning, canopy
reduction, removal, and replanting. A lack of funding
has resulted in deferred maintenance, safety
concerns, and increased risk throughout the City,
including commercial corridors. Over time, through
dedicated annual funding, the City will be able to
better manage and enhance the urban forest along
with the installation and maintenance of street rightof-way infrastructure.
BENEFITS
Significant additional tree maintenance, new tree plantings, and removal of dead trees.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: 2020-2025
CONSTRUCTION SCHEDULE: Ongoing annual
TOTAL PROJECT COST: $250,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Nathan Slack, Urban Forest Superintendent Phone: (805) 564-5592
E-mail:[email protected]
Urban Forest Management
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $249,955 $249,041 $249,880
TOTAL $249,955 $249,041 $249,880
72 PROJECT TITLE:
Chase Palm Park Renovation
WHY THIS PROJECT?
Nearing 25 years old, Chase Palm Park requires
infrastructure replacement and updates to revitalize
this important coastal park. Improvements include
replacement of the pavilion shade structure,
renovation of park restrooms, and replacement of
walkway and stucco surfaces. Renovations to Casa
Las Palmas, the adjacent snack bar, and patio would
increase site safety and enhance community use.
Landscape renovations include redesign of existing
landscaped areas currently in decline and renovation
of the existing pond.
The project is planned in phases, with RDA funds to
complete the arbor currently designated for the patio
area of Casa Las Palmas along with access related
improvements. Subsequent phases would address
infrastructure, landscape, accessibility and restroom
upgrades.
BENEFITS
The Parks and Recreation Department manages 60 City parks and facilities. Many of these facilities are aging and suffer from deferred maintenance. Specific capital renovation projects are identified as part of an annual assessment of park and facility needs.
QUICK FACTS
LOCATION: Chase Palm Park
DESIGN SCHEDULE: Fall 2022 through Spring 2024
CONSTRUCTION SCHEDULE: Fall 2024 thorugh Spring 2025
TOTAL PROJECT COST: $1.3 Million
FUNDING SOURCE: Measure C, Capital Outlay through RDA successor agency
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Jill Zachary, Parks and Recreation Director Phone: (805) 564-5431
E-mail: [email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 73 PROJECT TITLE:
Westside Center Event Renovation
WHY THIS PROJECT?
The Westside Center Event space is outdated, with
some sections in disrepair.
BENEFITS
This project involves renewing the floors, walls, ceiling, and lighting in the multi-purpose room. By updating and revitalizing this space, it will enhance the rental experience, boost demand for community use, and ultimately increase revenues and improve cost recovery.
QUICK FACTS
LOCATION: Westside Community Center, 423 W. Victoria Street, Santa Barbara, CA 93101
DESIGN SCHEDULE:
CONSTRUCTION SCHEDULE: Currently under construction.
TOTAL PROJECT COST: $316,228
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Community projects to support the City's parks and library Maintenance of City buildings
CONTACT INFORMATION
Project Manager: Ashley Lopez, Project Engineer
Phone: (805) 564-5499
E-mail: [email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 74 PROJECT TITLE:
Park & Recreation Equipment Replacement
WHY THIS PROJECT?
The Parks and Recreation Department maintains 60
parks and facilities with a wide range of equipment
that over time ages out and needs replacement in
order to achieve effective and efficient service
delivery.
BENEFITS
Well maintained parks and facilities to ensure public enjoyment and safety as well as preserve and extend the life of valuable City assets.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: 2023-2025
CONSTRUCTION SCHEDULE: Ongoing annual
TOTAL PROJECT COST: Varies by site
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Simon Herrera, Parks Manager
Phone:(805) 564-5464
E-mail: [email protected]
Park & Recreation Equipment Replacement
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $221,724
TOTAL $0 $0 $221,724
75 PROJECT TITLE:
Park Infrastructure Safety Program
WHY THIS PROJECT?
The purpose of this project is to undertake a
comprehensive landscape renovation of medians and
parkways managed by the City. There are 230 of
these areas, totaling 14 acres, located in the Public
Right of Way. Over 8 acres constitute “gateways” to
the City due to their location. Many of the landscapes
are worn out due to old plant material, poor
landscape design, poor or lack of irrigation systems,
minimal landscape maintenance and drought
conditions.
BENEFITS
Funds would be used to purchase and install new amenities when maintenance and repair are no longer feasible.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: 2023-2025
CONSTRUCTION SCHEDULE: 2023-2025
TOTAL PROJECT COST: Varies by site
FUNDING SOURCE: Measure C and General Fund
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Simon Herrera, Parks Manager
Phone: (805) 564-5464
E-mail: [email protected]
Park Infrastructure Safety Program
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
General Fund-Capital -$71 $79,712 $10,032
TOTAL -$71 $79,712 $10,032
76 PROJECT TITLE:
West Beach Splash Playground
WHY THIS PROJECT?
The West Beach Wading Pool has been closed since
2014, due to a major leak, ongoing response to
drought conditions, and mandatory requirement to
meet current ADA standards and upgrade pump and
filtration systems. Popular beachfront venue for
more than 75 years, the wading pool is well suited to
this location due to the adjacent playground and Los
Banos del Mar pool.
BENEFITS
The project will remove and replace the existing wading pool with either a new wading pool or a splash playground. Additional amenities would include a picnic area and restroom. A splash playground provides a safe and dynamic introduction to aquatic safety for young children during warmer months, while also functioning as a year-round destination playground.
QUICK FACTS
LOCATION: Shoreline Drive
DESIGN SCHEDULE: 2020-2025
CONSTRUCTION SCHEDULE: TBD
TOTAL PROJECT COST: $1,500,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Jill Zachary, Parks Recreation Director Phone:(805) 564-5431
E-mail:[email protected]
West Beach Splash Playground
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
General Fund-Capital $0 $0 $31,889
TOTAL $0 $0 $31,889
77 PROJECT TITLE:
Playground Replacement Program
WHY THIS PROJECT?
There are 23 children’s playgrounds located in City
parks. To meet safety standards and to replace aging
and dysfunctional equipment, the City strives to
replace playgrounds every 12 to 15 years.
BENEFITS
The project will replace aging and deficient playground equipment for children, and ensure equipment is in conformance with the latest safety and accessibility standards and child development practices.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: 2021-2025
CONSTRUCTION SCHEDULE: Varies by location
TOTAL PROJECT COST: Varies by site
FUNDING SOURCE: Measure C, General Fund, and CDBG
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Justin Van Mullem, Capital Projects Supervisor Phone: (805) 897-1972
E-mail: [email protected]
Playground Replacement Program
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $31,016 $18,680
TOTAL $0 $31,016 $18,680
78 PROJECT TITLE:
Municipal Tennis Center
WHY THIS PROJECT?
The purpose of this project is to renovate the
Municipal Tennis Center to address safety and
security concerns and enhance neighborhood and
player use. The project includes replacement of the
deteriorating wood stadium and equipment storage
areas; improvements to site security lighting and
surveillance; increasing the number of lighted courts;
renovation of the restrooms, locker rooms and lobby;
landscape and irrigation improvements for the
building entrance, as well as painting the exterior;
court fencing replacement and repairs; court
surfacing repairs and renovation.
BENEFITS
Constructed in 1936, the Municipal Tennis Facility provides thousands of Santa Barbara residents with tennis and pickleball playing opportunities and supports neighborhood families with a playground and walking paths.
Renovation of the facility will expand recreation opportunities through the adaption of tennis areas for other sport court opportunities, replacement of dysfunctional restroom and club house facilities, and enhanced safety and playability.
QUICK FACTS
LOCATION: Old Coast Highway
DESIGN
SCHEDULE: 2024-2026
CONSTRUCTION
SCHEDULE: TBD
TOTAL PROJECT
COST: TBD
FUNDING SOURCE: Measure C and grant
COUNCIL ESTABLISHED PRIORITIES MET
Police, Fire, and 911 emergency medical response.
Maintaining neighborhood fire stations.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Rich Hanna, Recreation Programs Manager Phone:(805) 897-2591
E-mail:[email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 79 PROJECT TITLE:
Alameda Plaza Renovation
WHY THIS PROJECT?
One of the City’s oldest parks, Alameda Plaza,
includes both an east and west quadrant. The park is
home to Kids World and provides a popular venue for
family gatherings, children's birthday parties, and
community events such as Earth Day and Summer
Solstice.
BENEFITS
This project will implement much needed comprehensive park infrastructure improvements, including accessible walkways, park entrances and picnic areas, new lighting, new signage, and repairs to the Band Stand.
QUICK FACTS
LOCATION: Micheltorena/Garden/Sola/Santa Barbara.Anacapa Streets DESIGN SCHEDULE: 2023-2024
CONSTRUCTION SCHEDULE: 2024-2025
TOTAL PROJECT COST: $1,400,000
FUNDING SOURCE: Measure C, Community Development Block Grant, General Fund
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Keven Strasburg and Justin Van Mullem
Phone: (805) 897-1906
E-mail: [email protected]
Alameda Plaza Renovation
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $27,196
TOTAL $0 $0 $27,196
80 PROJECT TITLE:
Franceschi Park Renovation
WHY THIS PROJECT?
Franceschi Park is a 17-acre park in Santa Barbara’s
Riviera neighborhood, featuring picnic areas, walking
paths, and panoramic views. The Park’s namesake,
Dr. Francesco Franceschi, operated a botanical
garden and nursery at the location from 1903 to 1913
and introduced hundreds of exotic plant species to
Southern California, some of which can still be found
at Franceschi Park today. The house on the park
property is dilapidated, unsafe and unusable. The
site is in need of significant stabilization and
renovation.
BENEFITS
This project will update the Franceschi Master Plan, develop an interpretive open-air terrace within the footprint of Franceschi House, and complete driveway and pedestrian access and landscape improvements.
The project will complete much needed infrastructure improvements including upgrading the driveway at Mission Ridge Road, stabilization of the retaining wall along the south-facing side of the house and circular driveway, renovation of site drainage, and reconstruction of the stone retaining wall north of the house.
QUICK FACTS
LOCATION: Franceschi Road
DESIGN SCHEDULE: 2023-2025
CONSTRUCTION SCHEDULE: TBD
TOTAL PROJECT COST: TBD
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Sean Stewart, Project Planner, Parks and Recreation Phone: (805) 897-1976
E-mail: [email protected]
Franceschi Park Renovation
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
General Fund-Capital $0 $0 $127,333
TOTAL $0 $0 $127,333
81 PROJECT TITLE:
Trails and Walkways
WHY THIS PROJECT?
Santa Barbara parks and public open spaces have a
myriad of trails and walkways that provide recreation
opportunities for walkers, runners, cyclists, hikers,
and, in a few locations, horseback riders.
BENEFITS
Open space trails whether within the Santa Barbara front country trail system or parks such as Hale, Honda Valley, Parma, or the Douglas Family Preserve, among others, require management and maintenance of vegetation, drainage, and tread. Developed walkways within urban City parks also need maintenance and expansion of walking surfaces. Public use of trails and walkways continues to grow driving the demand for enhanced maintenance as well as development of new networks. This project is intended to address both enhanced management as well as development of new trails and walkways within existing City parks and open space areas.
QUICK FACTS
LOCATION: Various City locations
DESIGN SCHEDULE: 2023-2025
CONSTRUCTION SCHEDULE: Varies by location
TOTAL PROJECT COST: Varies by site
FUNDING SOURCE: Measure C, State Grants, endowments
COUNCIL ESTABLISHED PRIORITIES MET
Protecting parks, youth, and senior services.
CONTACT INFORMATION
Project Manager: Jazmin LeBlanc, Assistant Parks and Recreation Director Phone: (805) 564-5513
E-mail: [email protected]
*This project does not have any activity as of October 2024. Once activity occurs, the financial actuals report will be generated, and a table will be added to this project page. 82 PROJECT TITLE:
Plaza del Mar Band Shell Renovation
WHY THIS PROJECT?
Plaza del Mar, a City park since the end of the
nineteenth century includes a Band Shell,
constructed in 1919. The park and the Band Shell
were once a popular destination for outdoor concerts.
Use of the park for concerts and other community
celebrations has declined over the decades. Regular
maintenance and preservation has not occurred, and,
as a result, the building requires structural repairs, a new roof, new lighting and other safety
improvements. The need for building repairs and the
limitations on indoor gatherings due to the
coronavirus pandemic, provide a timely opportunity to
re-establish the park as an outdoor concert venue
through the renovation of the Band Shell. The Band
Shell was designated a City Landmark in 1990.
BENEFITS
This project supports the community at large by offering the use of this facility once again. The project also increased accessibility measures, and a safer space for public engagement.
QUICK FACTS
LOCATION: 100 Castillo St., Santa Barbara, CA., 93101
DESIGN SCHEDULE: Complete
CONSTRUCTION SCHEDULE: Complete
TOTAL PROJECT COST: $1,400,000
FUNDING SOURCE: Measure C, State Grants, Nonprofit Donations
COUNCIL ESTABLISHED PRIORITIES MET
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Craig Shallanberger, Principal Architect Phone: (805) 897-2637
E-mail:[email protected]
Plaza del Mar Band Shell Renovation
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $0 $282,254
TOTAL $0 $0 $282,254
83 PROJECT TITLE:
Plaza De La Guerra Revitalization Project
WHY THIS PROJECT?
De la Guerra Plaza was designated a Public Square
in 1853 and has since served as Santa Barbara’s
center of town. In addition to serving as a civic
center, it has provided the location for the original
Police and Fire Stations. It is the venue for political activism and events including Old Spanish Days. De
la Guerra Plaza presents an opportunity for the City
to revitalize, beautify and reactivate its center of
town.
BENEFITS
A revitalized and improved Plaza will involve expanding the available usable space by making it pedestrian only and making structural and aesthetic improvements to better serve the community’s arts and cultural events throughout the year. Public Restrooms, consolidated trash and recycling for neighboring businesses, improved lighting, a community pavilion building, and public art are all benefits the community will enjoy with this project.
QUICK FACTS
LOCATION: De La Guerra Plaza
DESIGN SCHEDULE:
EIR process through 1st quarter 2025; HLC design review follows culminating in Project Design Approval; Archaeology Phase 3 work plan implemented, and building permit process.
CONSTRUCTION SCHEDULE: Construction start approximately Spring 2026, 10 - 12 months construction time.
TOTAL PROJECT COST: $19,000,000
FUNDING SOURCE: Measure C; Donations; potential grants
COUNCIL ESTABLISHED PRIORITIES MET
Police, fire, and 911 emergency.
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Brad Hess, Principal Project Manager
Phone:(805) 564-5373
E-mail: [email protected]
De La Guerra Plaza Revitalization
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $237,088 $291,625 $508,961
TOTAL $237,088 $291,625 $508,961
84 PROJECT TITLE:
Business Corridor Improvements
WHY THIS PROJECT?
The purpose of Business Corridor Improvement
projects is to provide the ongoing maintenance of
business corridors in order to support clean and
vibrant business districts. Project locations include,
but are not limited to, the following business districts:
State Street, Coast Village Road, and Milpas Street.
Work includes sidewalk maintenance, curb painting,
sign maintenance, graffiti abatement, electrical box
repairs/replacement, street lighting maintenance,
irrigation repairs, drinking fountain repairs,
repairs/replacement of existing benches, and other
maintenance improvements located in the public
right-of-way.
BENEFITS
Supporting business corridor improvements provides a safer, cleaner, and more vibrant business district.
Recently, this funding was used for several safety improvements on Coast Village Road, including new median island loading zones, new Americans with Disabilities Act (ADA) compliant sidewalk access ramps, rectangular rapid flashing beacons and a pedestrian refuge island on the 1100 block, and the removal and repair of deteriorated sidewalk, curb, and gutter. FY24 funds were also used for ADA compliance at the Depot Lot/Amtrak Station, and holiday lighting on State Street.
QUICK FACTS
LOCATION: Business Corridors (e.g., State Street, Milpas Street, Coast Village Road)
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $500,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Helping retain local businesses.
CONTACT INFORMATION
Project Manager: Ed France,Downtown Plaza & Parking Manager Phone: (805) 564-5656
E-mail: [email protected]
Business Corridor Improvements
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $96,283 $83,431 $759,222
TOTAL $96,283 $83,431 $759,222
85 PROJECT TITLE:
Americans with Disabilities Act (ADA) Transition Plan
WHY THIS PROJECT?
Public Works Facilities has an ongoing mission to
support the City’s ADA Transition Plan. This is an
ongoing effort to remove barriers to accessibility and
to conform with the latest accessibility requirements
and the Federal 2010 ADA Standards for Accessible
Design. Barrier removal is prioritized based on the
City’s approved ADA Transition Plan.
BENEFITS
For Fiscal Year 2032, the Facilities Division is planning to remove barriers and remedy obstacles to accessibility at City Hall. This includes exterior improvements and pathways to public areas from the first and second story. City Hall is considered the highest priority in the City’s ADA Transition Plan. Last Fiscal Year, funds were predominantly used for the design of City Hall restrooms on the second story and to remodel the Mackenzie Park restrooms for accessibility.
QUICK FACTS
LOCATION: City Hall, 735 Anacapa Street; and various other City locations DESIGN SCHEDULE: Fall 2022
CONSTRUCTION
SCHEDULE: Winter 2022 – Winter 2024
TOTAL PROJECT COST: $250,000
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager:Jesse Wheeler, Supervising Engineer
Phone:(805) 564-5348
E-mail:[email protected]
ADA Transition Plan
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $33,775 $114,980
General Fund-Capital $19,908 $0 $0
TOTAL $19,908 $33,775 $114,980
86 PROJECT TITLE:
ADA Transistion Plan & Facility Walkways: Walkways & Building Pathways WHY THIS PROJECT?
This project will provide accessibility improvements to pedestrian paths of travel on city owned properties.
BENEFITS
Improve access to city owned facilities.
QUICK FACTS
LOCATION: Citywide
DESIGN SCHEDULE: Ongoing
CONSTRUCTION SCHEDULE: Ongoing
TOTAL PROJECT COST: $180,795
FUNDING SOURCE: Measure C
COUNCIL ESTABLISHED PRIORITIES MET
Repairing local streets, potholes, bridges, and storm drains.
Upgrading public safety infrastructure.
CONTACT INFORMATION
Project Manager: Donna Lahey, Public Works Operations Manager Phone: (805) 897-2645
E-mail: [email protected]
Walkways & Building Pathways
2021 - 22 Actual 2022 - 23 Actual 2023 - 24 Actual
Measure C - Capital $0 $2,074 $17,131
TOTAL $0 $2,074 $17,131
87 SCHEDULE OF SOURCES AND USES MEASURE C
Fiscal Year Ending June 30, 2025
SOURCES Adopted Budget
Measure C Revenue $37,313,123
TOTAL SOURCES
USES
Police
Police Station Capital Project $700,000
Police Equipment Replacement $450,000
Subtotal - Police $1,150,000
Fire
Fire Regional Dispatch Center $850,000
Emergency Response Equipment Replacement $370,000
Subtotal - Fire $1,220,000
City Administration
Homeless Response $203,796
Subtotal - City Administration $203,796
Community Development
State Street Master Plan $500,000
Subtotal - Community Development $500,000
Public Works
Public Works Corporate Yard Repave $100,000
Subtotal - Public Works $100,000
Streets
Pavement Improvements $15,200,000
Sidewalk Replacement, Repairs, & Access Ramps $2,150,000 De la Guerra Plaza Renovation $1,200,000
Laguna Pump Station $1,200,000
Cliff Drive: Urban Highway Street Transportation $1,000,000, Drainage Assessment & Improvements, Sewer Lateral $700,000 Traffic Signal Upgrades & Maintenance $620,000
Active Transportation Plan Projects $500,000,
Business Corridor Improvements $500,000,
Pedestrian Enhancements: Sidwalk Infills $100,000,
Subtotal - Streets and Related Infrastructure $23,170,000 Facilities
Radio System Upgrade Project $2,000,000
Minor Facilities Renewal Projects $480,000
Public Works Corporate Yard Master Plan $150,000
Subtotal - Facilities $2,630,000
Downtown Parking
Revenue Control System $1,500,000
Parking Garages: Floor, Deck and Roof $575,000
88 Amtrak Building Repair $225,000
Public Parking Lot Improvements $50,000
Subtotal - Downtown Parking $2,350,000
Library
Library Technology Replacement $263,000
Central Library Lobby Update $200,000
Central Library Roof Terrace $200,000
Subtotal - Library $663,000
Parks & Recreation
Cabrillo Pavilion Renovation - Loan Repayment $902,327
Alameda Plaza Renovation $500,000
Central City Master Plan - Spencer Adams Park $500,000
Chase Palm Park Renovation $500,000
Urban Forest Management Plan, Median/Parkway Landscaping $350,000 Park Renovation & Open Space Management $300,000
Parks & Recreation Equipment Replacement $269,000
Minor Renewal - Park Restrooms $255,000
Franklin Neighborhood Center $250,000
Gibraltar & Scofield $250,000
Park Field Renewal & Irrigation $250,000
Plaza del Mar Fencing $250,000
Alice Keck Park Memorial Garden $200,000
Playground Replacement $150,000
Trails & Walkways $100,000
Park Infrastructure Safety Program $100,000
Plaza del Mar Band Shell Renovation $50,000
Subtotal - Parks & Recreation $5,176,327
$37,313,123
Powered by OpenGov
89 POLICE
Santa Barbara Police Department Station
The replacement of the Police Department Station. The current structure does not meet essential building standards and significant seismic issues must be addressed. Starting in FY2023 is for planned debt issuance.
Police Equipment Replacement
To allow the City to forecast operational equipment needs for the Police Department, reducing the annual augmentation requests for equipment replacement.
FIRE
Emergency Response Equipment Replacement
To allow the City to forecast operational equipment needs for the Fire Department, reducing the annual augmentation requests for equipment replacement.
Fire Regional Dispatch Center
Funds will be used to offset costs for Santa Barbara County Fire to provide dispatch services to City Fire Department.
CITY ADMINISTRATION
Homeless Response
This annual funding will help support addressing homelessness by prioritizing housing and facilities as outlined by Council Approved Priorities for Measure C.
COMMUNITY DEVELOPMENT
State Street Master Plan
This master planning effort addresses current economic challenges, builds from past ideas, links major City work efforts, leverages lessons learned from the COVID-19 reconfiguration, and implements our community’s priorities by establishing a new comprehensive vision with bold strategies and actionable implementation.
PUBLIC WORKS
Public Works Corporate Yard Repave
Repair dilapidated driveways at City operations yard.
STREETS
Pavement Maintenance and Improvement Program
Annual pavement maintenance includes the sealing of cracks, slurry seal, asphalt overlay, reconstruction, or other methods as appropriate to maintain an acceptable driving surface.
Pedestrian Enhancement: Sidewalk Replacement, Repairs, and Access Ramps To annually improve small sidewalk infill projects, replace or repair sidewalks, and access ramp construction projects in accordance with the Americans with Disabilities Act (ADA) and per City standard details.
Plaza De la Guerra Renovation
Plaza De la Guerra was designated a Public Square in 1853 and has since served as Santa Barbara’s center of town. In addition to serving as a civic center, it has provided the location for the original Police and Fire Stations. It is the venue for political activism and events including Old Spanish Days. De la Guerra Plaza presents an opportunity for the City to revitalize, beautify and reactivate its center of town.
Laguna Pump Station (FEMA match)
The renewal of this critical facility will provide more storm water capacity to the pumping system and will address many deferred maintenance issues at the facility. Measure C funds provide the needed grant match to the approved FEMA funding for the bulk of the project.
Measure C Fiscal Year 2025 Projects
NOTE: All projects appear in order of Sources and Uses table for Fiscal Year 2025 (see above) 90 Cliff Drive: Urban Highway to Complete Street Transformation Project In 2018, the City adopted a Vision Zero strategy that aims to prevent severe and fatal injuries on City streets by focusing resources on high-priority streets with documented collision patterns. Cliff Drive is the second-highest priority corridor in the City.
Drainage Assessment and Improvements
To provide a priority for system upgrades and maintenance, and annual program to maintain, improve, and construct citywide public drainage facilities.
Annual Sewer Lateral Repair
To replace broken sewer laterals, keeping them in operational order to both serve onsite Building waste uses and protect the environment.
Traffic Signal Improvements, Upgrades, and Maintenance
To replace aging traffic signal infrastructure to ensure long- term reliability. Most work will involve the replacement of underground conduit and wiring.
Active Transportation Plan Projects
To facilitate and improve multiuse pathways and alternative transportation options. Neighborhood feedback and the traffic safety analysis were summarized in the Westside and Lower West Neighborhoods Transportation Management Plan (Plan), identifying infrastructure projects to address neighborhood safety and mobility concerns.
Business Corridor Improvements
To provide ongoing maintenance of the business corridors to support a clean and vibrant downtown business district. Project includes sidewalk paver maintenance, curb painting, sign maintenance, graffiti abatement, street lighting maintenance, and maintenance of improvements located in the public right-of-way.
FACILITIES
Radio Control System Upgrade Project
This project will repair and replace aging City radio infrastructure including radio towers, backup power supplies, and other associated equipment. The radio network is critical for Public Safety and City operations.
Facilities Renewal
To update, maintain, or replace building security systems, HVAC, flooring & painting, and miscellaneous minor projects.
Public Works Corporate Yard Master Plan
The majority of these buildings were constructed in the 1970s and have been renovated multiple times to meet changing needs.
As City operations expand and space becomes more critical, the City needs to consider consolidating operations and other measures to maximize space efficiency.
DOWNTOWN PARKING
Revenue Control System Upgrade Project
Downtown Parking serves three million customers a year, including courtesy periods, ADA discount rates, event tickets, employee permits, and hourly use, across 15 parking lots. Upgrading our 17 year old revenue control system is critical to maintaining customer service and revenue generation and involves needed upgrades of technological systems.
Parking Garages: Floor, Deck and Roof
Waterproofing the parking garages on a routine basis is an important part of overall maintenance of the City’s parking structures. Treatments may include resealing floor joints, replacing deck coating, and adding water-repellent surface treatment for protection against carbonation-induced corrosion.
Amtrak Building Repair
This repair project in our historic Train Depot is part of an important re-roofing effort for the railroad station building.
Public Parking Lot Improvements
These projects complete the unification of two public lots, and relocate the Montecito Street entrance of Lot 13 to minimize impact to the historic Bay Moreton Fig Tree. They also reinforce barriers to prevent vehicles from driving off upper levels in Lot 9, and repair damage from a vehicle that crashed against and damaged these barriers.
LIBRARY
Library Technology Replacement
The Library has numerous technology assets with many items nearing end of life. Replacements are needed for both small and large equipment to maintain critical Library operations and provide necessary technology for quality programming and outreach.
Central Library Lobby Update
The Central Library Lobby has not been updated since the 1980's. Maintenance has been deferred and main entrance door is no longer operational, impacting safety and security, and the ability host after hours programs and room rentals.
Central Library Roof Terrace Renovation
91 The Library's roof terrace has been closed for several years due to extensive water damage and tripping hazards. The closure has prevented the Library from using the terrace as an additional programming and reservable space for the public.
SUSTAINABILITY & RESILIENCE
Electric Vehicle Infrastructure (Charger stations, zero emission policy) As part of the zero emission policy and climate action plan, Council has committed to both transition the City fleet to EVs and encourage the use of EVs in the general public. The Energy & Climate team has secured significant grant moneys to fund several charging station infrastructure projects. This Measure C money would supplement those efforts by providing Gap funding on those grant projects, as well as pursue sites that are not as attractive to current grant opportunities (especially for City-facing infrastructure).
PARKS & RECREATION
Payback to Fleet Replacement Fund for Cabrillo Pavilion Part of the Cabrillo Pavilion Renovation project was financed via a loan from Fleet Services. This is to pay back that loan.
Alameda Plaza Renovation
To implement much needed comprehensive park infrastructure improvements, including accessible walkways and park entrances, new lighting, new signage, and renovated picnic areas.
Central City Master Plan: Spencer Adams Park
The purpose of this project is to develop a new multi-purpose recreation center to serve a broad cross section of Santa Barbara residents. The facility would be developed in partnership with other recreation and community organizations and designed through extensive public outreach and community discussion. It is assumed that the facility would be located on existing City park and recreation designated property and could include the redevelopment of the Westside Center parcel or the parcels that comprise Spencer Adams Park, Louise Lowry Davis Center, and the 1235 Teen Center.
Chase Palm Park Renovation
To revitalize this important coastal park with improvements including replacement of the pavilion shade structure, renovation of park restrooms, and replacement of walkway and stucco surfaces. Renovations to Casa Las Palmas, the adjacent snack bar, and patio would increase site safety and enhance community use. Landscape renovations include redesign of existing landscaped areas currently in decline and renovation of the existing pond.
Urban Forest Management Plan Implementation
To better manage and enhance the urban forest along with the installation and maintenance of street right-of-way infrastructure, and to undertake a comprehensive landscape renovation of medians and parkways managed by the City, as many of the landscapes are worn out due to old plant material, poor landscape design, poor or lacking irrigation, minimal landscape maintenance, and drought conditions.
Park Renovations & Open Space Management
The purpose of these projects is to develop and implement a comprehensive habitat and open space management plan for Hale Park and Honda Valley Park. The open space management plan will include creek restoration, tree management for habitat enhancements while meeting defensible space requirements, trail improvements, and park infrastructure needs.
Parks and Recreation Equipment Replacement
The Parks and Recreation Department maintains 60 parks and facilities with a wide range of equipment that over time ages out and needs replacement. Well maintained parks and facilities ensure public enjoyment and safety as well as preserve and extend the life of valuable City assets.
Minor Renewal: Park Restrooms
To address significant deferred maintenance for the 23 restrooms in 19 parks. Park facility restroom renovations will generally include compliance with accessibility requirements, new plumbing lines and fixtures, wall and floor surfaces, partitions, lighting, and screening. In some cases, roof, venting, and structural repairs will be needed.
Franklin Neighborhood Center
The Franklin Neighborhood Center Parking lot is in poor and unsafe condition. Designed and construction in 1970, the parking lot has not had any upgrades. Used by thousands of visitors to the Health Center and community Room.
Gibraltar & Skofield: 25% match
Roadway repairs as a result of the 2023 Storm Season. These road provide access to critical City infrastructure and residents.
Park Field Renewal and Irrigation
The project provides for a comprehensive program to renew key park sprots fields and turf areas and to replace and upgrade irrigation systems at City parks and facilities The Parks Division also manages 56 irrigation systems, many of which are more than 30 years old. There are a number of parks and sports facilities that require new irrigation systems due to corroded pipes, ineffective sprinkler systems, and degraded equipment.
Plaza del Mar Fencing
The purpose of this project is to establish perimeter fencing around the recently restored Historic Band Shell. Fencing will ensure the City is able to manage access and protect the valuable City asset.
Alice Keck Park Memorial Garden
The purpose of this project is to undertake a comprehensive renovation of Alice Keck Park Memorial Garden, one of the City’s most popular and significant horticultural parks. Constructed in 1979, the park has many original landscape beds and park infrastructure that need renovation.
92 Playground Replacement
To replace aging and deficient playground equipment for children, ensuring compliance with the latest safety and accessibility standards and child development practices.
Trails and Walkways
This project is intended to address both enhanced management as well as development of new trails and walkways within existing City parks and open space areas.
Park Infrastructure Safety Program
To implement a comprehensive park infrastructure safety program to increase and enhance park safety and improve visitor services. Many of these amenities suffer from constant use and weathering. Tables, benches, trash cans, and BBQs need regular replacement.
Plaza del Mar Band Shell Renovation
To complete renovation of the Band Shell, which will revitalize and enhance public access to Plaza del Mar for music, theatre, dance, cultural, and community celebrations for Santa Barbara residents of all ages.
Powered by OpenGov
93 CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: City Administrator’s Office
SUBJECT: Cancellation of Certain Council Meetings in 2025 RECOMMENDATION:
That Council cancel the regular Council Meetings on the following dates: January 21, February 18, March 25, April 1, May 27, June 24, July 8, July 15, July 22, August 26, September 2, October 28, November 4, November 11, November 25, December 23, and December 30, 2025.
DISCUSSION:
Each year, we review the calendar for the regular City Council Meeting dates. The Council meeting schedule has been established based on cancelling the Council meetings on the Tuesdays following a holiday and providing for a summer and winter break. We are now proposing the cancellation of meetings for the 2025 Calendar year.
Using this criteria, the following meetings would be cancelled:
Tuesday, January 21, 2025 (Tuesday after Martin Luther King, Jr. Holiday) Tuesday, February 18, 2025 (Tuesday after Presidents Day Holiday) Tuesday, March 25, 2025 (Spring Break)
Tuesday, April 1, 2025 (Tuesday after Cesar Chavez Day Holiday) Tuesday, May 27, 2025 (Tuesday after Memorial Day Holiday) Tuesday, June 24, 2025 (Tuesday after Juneteenth Holiday) Tuesday, July 8, 2025 (Tuesday after July 4th Holiday) Tuesday, July 15, 2025 (Summer Break)
Tuesday, July 22, 2025 (Summer Break)
Tuesday, August 26, 2025 (Summer Break)
Tuesday, September 2, 2025 (Tuesday after Labor Day Holiday) Tuesday, October 28, 2025 (Cancellation)
Agenda Item No. 15
File Code No. 120.09
Council Agenda Report
Cancellation of Certain Council Meetings in 2025
November 12, 2024
Tuesday, November 4, 2025 (Election Day)
Tuesday, November 11, 2025 (Veteran’s Day Holiday)
Tuesday, November 25, 2025 (Tuesday before Thanksgiving Holiday) Tuesday, December 23, 2025 (Winter Break)
Tuesday, December 30, 2025 (Winter Break)
PREPARED AND
SUBMITTED BY: Nicole Grisanti, Administrator’s Office Supervisor APPROVED BY: Kelly McAdoo, City Administrator
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: City Administrator’s Office
SUBJECT: Legislative Update to City Council
RECOMMENDATION:
That Council hear a presentation related to current state legislation and the advocacy efforts of Townsend Public Affairs, Inc. on behalf of the City of Santa Barbara and provide guidance to staff and Townsend on the City’s legislative priorities for the coming year.
DISCUSSION:
Given the complexity of issues that the City is confronting, the City obtained the services of Townsend Public Affairs, Inc. (Townsend) to represent the City at the state level to ensure that our interests and needs are considered when State legislators and policymakers are executing legislative and budgetary decisions.
At this legislative update, Townsend will share current state legislation that aligns with the policy priorities of City Council and advocacy efforts that have been facilitated by Townsend in collaboration with City staff.
BUDGET/FINANCIAL INFORMATION:
The agreement with Townsend was initiated in August 2023 and was renewed this fiscal year for $63,000, a five percent increase from the previous fiscal year. Funding for this agreement was included in the adopted Fiscal Year 2025 budget.
PREPARED BY: Barbara Andersen, Sr. Assistant to the City Administrator SUBMITTED BY: City Administrator’s Office
APPROVED BY: Kelly R. McAdoo, City Administrator
Agenda Item No. 16
File Code No. 170.01
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: Public Works Department
SUBJECT: Contract for the Construction of the Santa Barbara Police Station [Resolution; Agreement]
RECOMMENDATION: That Council:
A. Award a contract to ProWest Constructors Inc., for their best value proposal of $95,998,811 for the construction of the new Santa Barbara Police Station; and authorize the Public Works Director to execute the contract and approve expenditures up to $9,600,000 that may result from contract change orders or extra scope of work that may be required; and
B. Adopt, by reading of title only, a Resolution of the Council of the City of Santa Barbara Authorizing the Finance Director and Risk Manager to Acquire and Execute Policies of Insurance and Other Agreements Necessary to Implement an Owner-Controlled Insurance Program for the New Police Station Construction Project.
EXECUTIVE SUMMARY:
A new police station for the Santa Barbara Police Department has been a top-priority capital improvement endeavor for decades. The existing Police Headquarters was constructed in 1959 for a staff of 85, which has grown to 212 sworn and non-sworn employees. The existing Police Headquarters does not meet the seismic codes for essential services buildings, nor does it meet the current building code and accessibility standards. Currently, police staff are in four separate locations. The Santa Barbara Police Station Project (Project) commenced after approval of Measure C in November 2017.
Following an extensive needs assessment, an exhaustive site selection process landed on the Cota Commuter Lot (119 East Cota Street) as the preferred location. Design was completed by a team lead by a local architecture firm (The Cearnal Collective LLP) and an architecture firm specializing in public safety facilities (McClaren, Wilson & Lawrie, Inc.). The Project will consist of a new three-story, ±65,000-square-foot Police Station, and an ±85,000-square-foot new secure parking structure. The new Santa Barbara Police Station will bring the entire Police Department under one roof and provide the necessary space, technology, and training facilities to support the department and community for many years to come.
Agenda Item No. 17
File Code No. 520.02
Council Agenda Report
Contract for the Construction of the Santa Barbara Police Station [Resolution; Agreement] November 12, 2024
The Project has received all required approvals to begin construction. The construction plans and specifications for the Project were included in a Request for Proposals sent to six pre-qualified contractors in August 2024. Two proposals were received and have been evaluated using a Best Value selection process that includes price and predetermined selection criteria as factors in determining the successful contractor. Both cost proposals exceeded the Engineer’s estimate of $90M. The proposal received from ProWest Constructors Inc., was determined to provide the best value and is recommended for award.
A groundbreaking ceremony is tentatively planned for November 18th. Construction is anticipated to begin in full force in January 2025. The site preparation and construction process are estimated to take approximately 24 to 27 months, which includes approximately 3 to 4 months for the earthwork phase and 23 to 24 months for the construction phase. Following construction and contractor demobilization, there will be a final phase of relocating existing operations into the new facility.
DISCUSSION
The Project will bring the entire Police Department under one roof and provide needed space, technology, and training facilities. Police operations will remain the same as they presently exist at the current locations, including Investigative/Internal Operations Division, Field Operations Division, Community Support Services Division, and Common Areas (public lobby, multi-purpose meeting rooms, staff break rooms, fitness room, and locker rooms). The public lobby area will be separated from the secure staff areas.
The new facility is anticipated to increase recruitment and retention of employees, improve morale, and provide the department with a facility that is commensurate with the technological requirements of community policing today and in the future. The new facility will accommodate future growth of the department, it will be flexible in its ability to accommodate any future changes within the department, and it will be a welcoming space for our community.
SELECTION PROCESS:
The selection process for a general contractor to construct the Project began with a prequalification process in late 2023 to prequalify contractors capable of building an essential services building of this scope and magnitude. Through this process, a total of six contractors were pre-qualified to receive the Request for Proposals (RFP) package. In March 2024, the City’s Charter was amended through Measure A that allowed for different procurement methods, such that this Project was no longer subject to a low-bid proposal. It was determined that using the Best Value method would provide the City the opportunity to select a contractor based on multiple criteria which include, but are not limited to, cost alone.
Council Agenda Report
Contract for the Construction of the Santa Barbara Police Station [Resolution; Agreement] November 12, 2024
Two pre-qualified general contractors submitted best value proposals: ProWest Constructors Inc., (ProWest) and Swinerton Builders. The proposals were reviewed independently by a panel and scored relative to the selection criteria laid out in the RFP document. In addition, interviews were conducted with each general contractor and the review panel.
The selection criteria outlined in the RFP were as follows:
Selection Criteria Maximum Points
Relevant Experience 200
Contract Schedule 150
Demonstrated Management Competency 200
Labor Compliance 100
Safety Record 250
Interview 100
Total Possible Qualification Points 1,000
These review panel scores were averaged for a Qualification Points total. The Best Value calculation was derived from dividing the proposed cost by the average of Qualification Points received. The lowest calculated number equals the Best Value.
Best Value Score = Proposed Cost / Average of Qualification Points Received ProWest’s proposal produced the overall Best Value. Staff recommends that Council authorize the Public Works Director to enter into a contract with ProWest.
The Project, as an improvement in an amount greater than $5,000,000, must include a project labor agreement. Therefore, the Community Workforce Agreement (CWA) between the City and the Tri Counties Building and Construction Trades Council is included as a requirement of the construction contract with ProWest. The City will retain the services of a CWA administrator to monitor compliance throughout construction.
OWNER CONTROLLED INSURANCE PROGRAM
The City is also embarking on an Owner Controlled Insurance Program (OCIP) for the Project. The OCIP will include Workers’ Compensation and Employer’s Liability Insurance, Commercial General Liability Insurance, Builders Risk Insurance, and Excess Liability Insurance in connection with the Project. Under the OCIP, the City will acquire comprehensive insurance for the Project. The parties eligible to enroll in the OCIP are the Contractor selected and Subcontractors performing a portion of the work on the Project site.
The OCIP will be managed by Alliant Insurance Services Inc., (“Administrator”) on behalf of the City. The OCIP is one of many services provided by PRISM, a joint powers agency of which the City is a member, that provides insurance and risk financing services to public agencies. Alliant Insurance Services Inc. provides brokerage services for PRISM and will provide OCIP brokerage and Administrator services to the City through PRISM. The intent of the OCIP is to purchase certain insurance policies for protection of some, but not all, of Council Agenda Report
Contract for the Construction of the Santa Barbara Police Station [Resolution; Agreement] November 12, 2024
the insurable risks that exist on a construction project. The City will pay all insurance premiums for the coverage. In addition to the actual cost savings for the coverage provided, the added savings for the Project and for the City is in the efficiency and time savings that the OCIP administration provides by having a single Administrator handling claims and addressing issues. The time savings to the Project directly translates into cost savings. This model has been very successful in other jurisdictions, such as Santa Barbara County. The proposed resolution will authorize the Finance Director and Risk Manager to execute necessary insurance policies and other agreements to implement the OCIP.
BUDGET/FINANCIAL INFORMATION:
The Project has been funded by Measure C since its inception. Funding for the construction phase of the project will shift to debt financing, via the issuance of 30-year lease revenue bonds that will be implemented in December 2024 and available for the Project that same month. From that point forward, the costs for this Project will be paid through the bond proceeds. Repayment on the bonds (rent) cannot begin until the project is complete (2027) and available for use. The required debt services are anticipated to initially represent approximately 24.0% of the annual Measure C revenue budget.
However, while the annual debt service expense will remain the same, it is anticipated that the percentage of Measure C funds utilized to pay the debt service will decrease as Measure C revenue increases over time.
There were several additional and unanticipated owner-furnished items compared to the original budget. Those include IT equipment and communications, OCIP, construction management, and escalation due to inflation over the past 18 months. Most of the ownerfurnished items and any additional contingency needed for the Project will be funded through future Measure C appropriations during upcoming annual budget cycles.
The Project, as an improvement in an amount greater than $5,000,000, must include a project labor agreement. Therefore, the Community Workforce Agreement (CWA) between the City and the Tri Counties Building and Construction Trades Council is included as a requirement of the construction contract with ProWest. The City will retain the services of a CWA administrator to monitor compliance throughout construction.:
Council Agenda Report
Contract for the Construction of the Santa Barbara Police Station [Resolution; Agreement] November 12, 2024
ESTIMATED TOTAL PROJECT CONSTRUCTION COST
Construction Costs – General Contractor $95,998,811
Owner-Furnished Items – Furniture, Fixtures, & Equipment 5,500,000 Construction Management 2,315,000
Construction Administration & Design 1,375,000
Inspections and Testing 550,000
Conditions of Approval Compliance 461,000
Permits & Fees 346,000
Owner Controlled Insurance Program (OCIP) 3,166,879
Subtotal $109,712,690
Construction Contract Contingency 9,600,000
Other Project Contingency – Non Construction 2,000,000
Total Project Construction Cost to Completion $121,312,690 In addition to the future costs detailed above, the project has incurred expenses to date for all architecture and engineering, planning and design services, that total approximately $7.5 Million, funded entirely by Measure C sales tax revenues.
SUSTAINABILITY IMPACT:
The new Zero Net Energy (ZNE) police station will result in a large reduction of the building’s carbon footprint and energy consumption as compared to a conventional building and the current facilities. As a ZNE facility, the police station will generate as much energy as it consumes through renewable energy sources like solar power, supporting the City’s commitment to carbon neutrality. This initiative meets the City’s Municipal Green Building Policy and reflects Santa Barbara’s broader goals of enhancing energy efficiency, reducing greenhouse gas emissions, and promoting environmental stewardship. Additionally, the station’s sustainable design and operational practices set a standard for future municipal projects, demonstrating leadership in creating resilient, energy-efficient infrastructure while enhancing public safety.
A copy of the contract may be requested from the Public Works Department for public review by contacting [email protected].
Council Agenda Report
Contract for the Construction of the Santa Barbara Police Station [Resolution; Agreement] November 12, 2024
ENVIRONMENTAL REVIEW:
The City of Santa Barbara’s Public Works Department prepared a Mitigated Negative Declaration (MND) that examines environmental impacts as required per the California Environmental Quality Act (CEQA) of the Project (PLN2020-00627). The MND has been prepared in accordance with CEQA (Public Resources Code §21000 et seq.) and the State CEQA Guidelines (Title 14, California Code of Regulations, §15000 et seq.).
Significant environmental effects identified in the MND which are anticipated as a result of the Project include impacts related to the following CEQA analysis of Air Quality, Biological Resources, Cultural and Tribal Resources, Geology and Soils, Hazards and Hazardous Materials, Land Use and Planning, Noise, and Water Quality and Hydrology.
The MND includes proposed mitigation measures to mitigate potentially significant impacts to a less than significant levels. Based on the mitigation measures identified in the MND, it has been determined that the project will not have a significant effect on the environment after mitigation measures are incorporated. The MND was adopted on July 19, 2022, by City Council.
PREPARED BY: Brian D’Amour, P.E., City Engineer/BH/sk
SUBMITTED BY: Clifford M. Maurer, P.E., Public Works Director APPROVED BY: Kelly McAdoo, City Administrator
RESOLUTION NO.
A RESOLUTION OF THE COUNCIL OF THE CITY OF SANTA
BARBARA AUTHORIZING THE FINANCE DIRECTOR AND
RISK MANAGER ACQUIRE AND EXECUTE POLICIES OF
INSURANCE AND OTHER AGREEMENTS NECESSARY TO
IMPLEMENT AN OWNER-CONTROLLED INSURANCE
PROGRAM FOR THE NEW POLICE STATION
CONSTRUCTION PROJECT
WHEREAS, the City of Santa Barbara desires to establish an owner-controlled insurance program (OCIP) with respect to the construction of a new Police Station; and WHEREAS, the Finance Director and Risk Manager confirmed that Alliant Insurance Services Incorporated (Alliant) has necessary qualifications, experience, technical facilities, and personnel to provide the brokerage and administration services necessary for the OCIP;
WHEREAS, Alliant’s services are made available through PRISM, a joint powers agency of which the City is a member;
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SANTA BARBARA as follows:
1. The Finance Director and Risk Manager are each authorized and directed to execute agreements, approved as to form by the City Attorney, as may be necessary or convenient to the provision of insurance brokerage and administrator services for an owner-controlled insurance program (OCIP) with respect to the construction of the new Police Station with Alliant Insurance Services Incorporated.
2. The Finance Director and Risk Manager, upon recommendation of Alliant Insurance Services Incorporated, to select and acquire comprehensive, cost-effective insurance programs or policies to implement an OCIP related to the construction of a new Police Station; and to execute agreements and related documents, subject to approval as to form by the City Attorney, to bind coverage; issue payments for insurance premiums and required collaterals; and implement various programs necessary and convenient to establishment and implementation of an owner-controlled insurance program, and further to execute insurance applications and related documents necessary to design and market an owner-controlled insurance program and to perform such other acts necessary or convenient to carry out the purposes of this Resolution.
3. The authority granted by this Resolution is limited to funds budgeted and appropriated such purposes.
CITY OF SANTA BARBARA
COUNCIL AGENDA REPORT
AGENDA DATE: November 12, 2024
TO: Mayor and Councilmembers
FROM: City Administrator’s Office
SUBJECT: Presentation on the Findings and Recommendations from the Housing Crisis Ad Hoc Committee
RECOMMENDATION: That Council:
A. Receive a presentation on behalf of the Housing Crisis Ad Hoc Committee regarding its key findings and recommendations; and
B. Advise staff on priorities and give direction for further research and exploration.
EXECUTIVE SUMMARY:
The Housing Crisis Ad Hoc Committee was formed on April 19, 2022. Mayor Rowse appointed Councilmember Oscar Gutierrez as Chair and Councilmembers Alejandra Gutierrez and Kristen Sneddon as members. The motion approved was to create an ad hoc committee to address the housing crisis while folding in items of rent cap and a rent registry for further discussion.
The Committee began meeting in 2023 and formalized their objectives as follows:
(a) Rely on local expertise and stakeholders to offer input, suggestions, and priorities for Council to consider in addressing the local affordable housing crisis; (b) Hold a community forum to solicit community input; and (c) Present to Council the full suite of suggestions with emphasis on the top recommendations from the Ad Hoc Committee with the goal of setting near and long-term priorities.
The Committee interviewed over twenty-eight (28) key stakeholder groups and member associations over this period to help form their initial findings and recommendations. A community workshop was also held on October 14, 2024 that included close to 100 participants along with 64 attendees that participated virtually through Zoom. The purpose of the workshop was to receive additional feedback on the Committee’s findings as well Agenda Item No. 18
File Code No. 170.01
Council Agenda Report
Presentation on the Findings and Recommendations from the Housing Crisis Ad Hoc Committee
November 12, 2024
as how recommendations should be prioritized by City Council for further research and discussion.
DISCUSSION:
The State of California is facing an affordable housing crisis due to a combination of factors, and the City of Santa Barbara is no exception. This includes a critical affordable housing shortage, high cost of living including rising home prices and rental rates that are pricing out residents, and a persistent number of people experiencing homelessness.
The Housing Crisis Ad Hoc Committee was formed to explore these issues and identify policy and program recommendations for consideration by City Council. Several of the recommendations have already been incorporated into the City’s 2023 – 2031 Housing Element1 and are programmed for implementation with timelines, but others will require additional staff time and resources for extended research and to identify important considerations for potential implementation. As a result, staff seeks direction from the Council on the top priorities from those policy recommendations that are not already a part of the Housing Element implementation. This will help staff identify the resources needed to conduct additional research and community outreach on these policy ideas in the context of existing workloads. Staff also intends to incorporate the direction given at this meeting as part of the upcoming strategic planning efforts and will return to Council for a broader prioritization and resource allocation discussion in that context as well.
Committee Findings
The Committee synthesized the following findings from key stakeholder interviews that helped shape their recommendations. The challenges identified by tenants include, but are not limited to, the following:
High barriers to rental housing (e.g. three times the income needed, above 650 credit score, security deposits and not accepting co-signers) Rental prices are far outpacing wages
Lack of compliance from property owners (e.g. no lease agreements, timing for eviction notices)
Fear of retaliation and eviction
Dwindling housing supply
The challenges identified by property owners include, but are not limited to, the following:
Expenses are increasing (e.g. roof repairs, water and gas mains, electrical issues, rising construction costs, and insurance)
City ordinances and regulations are obscure, hard-to-find, and not available in Spanish
1 The City of Santa Barbara’s 2023 – 2031 Housing Element is available for reference at:
https://santabarbaraca.gov/HousingElement.
Council Agenda Report
Presentation on the Findings and Recommendations from the Housing Crisis Ad Hoc Committee
November 12, 2024
Fear of criminal prosecution
Fear that if they don’t keep up with rental increases, they won’t be able to make up the needed income down the line to make needed repairs and upgrades and to keep up with other increased expenses
Delays in getting through the permitting process and associated costs as a result Committee Recommendations
The Committee organized their recommendations into five different categories including:
(1) education and access to information; (2) increasing affordable housing supply; (3) incentive programs; (4) support for innovation; and (5) regulation and City programs.
During the October 14, 2024 community workshop, the Committee presented their findings and recommendations and solicited additional input from the public. Close to 100 people participated in person and weighed in on what was missing in the Committee’s findings as well as how the recommendations should be prioritized. The feedback received is included as an Attachment to this Council Agenda Report.
The community workshop also had a virtual participation option through Zoom which included a total of 64 attendees. Given the significant number of participants, staff solicited feedback on prioritization through a poll that included the five broader categories.
There were 34 responses to the poll and the top three priorities emerged as: (1) increasing affordable housing supply; (2) incentive programs; and (3) support for innovation including leveraging public-private partnerships. This input was weighted in the priority ordering included below.
The following recommendations are being presented in priority order based on this community feedback. The recommendations in italics are included in the City’s 2023 – 2031 Housing Element.
(1) Prioritize more workforce housing for the “missing middle” (middle to upper middle-income households). The term “workforce housing” is typically used to refer to units for households that are overqualified for subsidized affordable housing yet cannot afford the average market-rate housing. Goal 2 in the 2023 – 2031 City’s Housing Element commits to prioritize housing that is affordable to the workforce and vulnerable communities.
(2) Dedicate a permanent funding source for the Local Housing Trust Fund. The Local Housing Trust Fund was established in January 2024. This is also included as Goal 8 in the City’s Housing Element.2 All inclusionary housing in-lieu fees were identified as the dedicated and continuous source for operations of the Fund for a minimum of the required first five years of the Fund’s existence. However, this amount is insufficient to meet the affordable housing needs of the City of Santa Barbara. 2 2023 – 2031 City of Santa Barbara Housing Element Program HE-16: Create Affordable Housing Funds, page 138.
Council Agenda Report
Presentation on the Findings and Recommendations from the Housing Crisis Ad Hoc Committee
November 12, 2024
(3) Work to ensure that UCSB and SBCC are providing sufficient housing for their student populations. There were 13,427 enrolled students at Santa Barbara City College in Fall 2023 and another 26,420 students (including undergraduate and graduate) enrolled at the University of California, Santa Barbara. SBCC does not own or operate any on-campus student housing. For UCSB, approximately 38% of students live in campus housing and the other 62% of students choose to live off-campus. Of those living in the local community, approximately 5% (or 1,321 students), live in the City of Santa Barbara. Coordinating and discussing the issue with other local jurisdictions, UCSB and SBCC is included in the City’s Housing Element.3
(4) Implement a rent stabilization ordinance. This is also known as rent control and limits how much rent a landlord can increase and how often it can be increased. The California Tenant Protection Act of 2019 (TPA) already limits rent increases for most residential tenants. The maximum annual rent increase is 5% plus the percentage change in the cost of living for the region, or 10 percent, whichever is lower. The TPA does not apply to certain specific types of housing, such as housing built in the last 15 years.
Proposition 33 would have repealed the Costa-Hawkins Rental Housing Act that set the limits on how cities and counties could apply rent control, including the exemption of single-family homes, condos and any other housing built on or after February 1, 1995.
Given that it did not pass statewide during this year’s election and also with approximately 59% of City of Santa Barbara voters not in support, further staff research could potentially explore the impact that a new ordinance could have due to the current limits on local control as well as other rent stabilization strategies that could be implemented. (5) Create a rental registry. A rental registry is a database that contains information about rental properties and their owners. Landlords or housing providers would provide the information to comply with local ordinances. Information often includes property details, current rent and allowable rent increases, landlord contact details and management company information. Rental registries can assist cities in tracking rent increases and tenancy changes, monitor compliance with local ordinances, communicate rental unit data to landlords and tenants, and plan for infrastructure like schools and transportation. There are many different mechanisms for creating a rental registry and the more comprehensive registries can be extremely costly in terms of implementation and ongoing staff resources needed to support it. Options for implementing a rental registry should be weighed based on other competing priorities for the funding and staff resources needed to implement such a registry.
(6) Sustain a short-term rental enforcement program. The City launched a one-year pilot program in August 2023 with the objective of gathering accurate data and increasing enforcement of unpermitted, illegal short-term rentals. This pilot program is being led by the City Attorney’s Office and was recently converted into a permanent program. Goal 4 3 2023 – 2031 City of Santa Barbara Housing Element Program HE-30: Affordable Student, Staff, and Faculty Housing, page 155.
Council Agenda Report
Presentation on the Findings and Recommendations from the Housing Crisis Ad Hoc Committee
November 12, 2024
of the City’s Housing Element4 calls for a future short-term rental permit program.
Additional financial resources, which could be raised by permit program fees and penalties, would be needed to sustain creation and implementation of such a program. (7) Expand rental housing mediation program / consider mandatory mediation for certain rent increases. The City’s Rental Housing Mediation Program (RHMP) was established in 1976 and currently comprises three full-time staff and a Board of 15 trained community volunteers appointed by City Council and dedicated to resolving rental housing disputes by offering mediation services and information on Landlord-Tenant rights and responsibilities. This program is included as a strategy under Goal 45 in the City’s Housing Element but given the reduction in State funding utilized to support this program, an expansion would require additional budgeted resources by City Council. (8) Sustain the access to legal counsel program. City Council established a new access to counsel pilot program in July 2024 by providing up to $250,000 in funding to the Legal Aid Foundation of Santa Barbara County to operate the program. The goal of the program is to provide legal services to tenant households at risk of eviction and support would be limited to very low-income tenant households who live in the City of Santa Barbara.
(9) Create incentive programs for housing providers. This includes tax incentives for below market rental units, programs/credits for improvements and repairs, and allowances for capital improvements. A study conducted in 2021 by BAE Urban Economics indicated that multi-unit hard construction costs are upwards of $388 per square foot of built space, not including parking hard costs of $40,000 per podium space.
Soft costs such as engineering, architecture, financing, and California Environmental Quality Act (CEQA) review costs, as well as City cost-recovery fees for planning, permitting, and entitlements, are equal to 19 percent of hard costs. In recent years, several factors have caused the increase in cost as well as the availability of construction materials and equipment.
The City’s Housing Element6 does include strategies specific to providing rehabilitation funds for affordable multi-unit housing and technical assistance and funding home improvements and repairs for income-qualified households, respectively. A pilot program to fund income-qualified improvements and repairs was initiated in partnership with Habitat for Humanity with an initial investment of $50,000 to support approximately 10 homes annually.
4 2023 – 2031 City of Santa Barbara Housing Element Program HE-19: Short-Term Rental Framework and Ordinance, page 147.
5 2023 – 2031 City of Santa Barbara Housing Element Program HE-17: Support Rental Housing Mediation Program, page 140.
6 2023 – 2031 City of Santa Barbara Housing Element Programs HE-24: Fund Home Rehabilitation and Provide Technical Assistance and HE-25: Fund Home Improvements and Repairs, page 151.
Council Agenda Report
Presentation on the Findings and Recommendations from the Housing Crisis Ad Hoc Committee
November 12, 2024