Cities Index.
Agenda packet

Santa Barbara City Council
March 11, 2025

Document
Agenda packet
Meeting
March 11, 2025
Body
Santa Barbara City Council
Pages
10
Original file
48.9 MB
Text extracted from the city's file for reading and search. Open the original on docs.santabarbaraca.gov. That file is the official record.

Specific Plans or Policies Relating to this Project:

This project will meet the goals of the City’s Local Coastal Plan, Bicycle Master Plan, and Pedestrian Master Plan ensuring safety for all road users. Portions of this project were conditioned upon the US Highway 101 Operational Improvement Project and remain outstanding. Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City. This project is in an identified Vision Zero Priority Corridor (Cabrillo), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

The project’s Coastal Development Permit was approved in May 2018, and received National Environmental Policy Act/environmental clearance from Caltrans. The Project was broken into two phases due to funding constraints. Phase 1 includes the Los Patos/Cabrillo Roundabout, which is currently under construction and is anticipated to be complete by March 2025. Phase 2 is the Cabrillo Underpass Replacement at the Union Pacific Railroad, for which SBCAG is seeking SB1 grant funding in November 2024.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 3,135,719 985,281 0 0 0 0 0 0 $0 $4,121,000
Grant 0 4,608,344 0 354,490 21,803,656 0 0 0 $22,158,146 $26,766,490 Total 3,135,719 5,593,625 0 354,490 21,803,656 0 0 0 $22,158,146 $30,887,490 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Calle Real Multiuse Path
Description:

This project includes the installation of a new multiuse path on Calle Real, between Treasure Drive and La Cumbre Road. The project was identified as part of a Citywide safety analysis where pedestrian/bicycle vs.. vehicle injury collisions were identified along this corridor.

Specific Plans or Policies Relating to this Project:

Circulation Element Policy, 5.1: "The City shall create an integrated pedestrian system within and between City neighborhoods, schools, recreational areas, commercial areas, and places of interest." Circulation Element policy to expand and enhance the system of bikeways to serve current community needs, and to develop increased ridership for bicycle transportation and recreation.

Circulation Element Policy, 5.2. "The City shall link pedestrian paths with other alternative modes of transportation." Capital Costs:

Status:

The City received Active Transportation Funding to implement the segment from Las Positas Road to Treasure Drive with the Westside and Lower Westside Active Transportation Plan Implementation Project. Funding is required for the multiuse path between Las Positas and La Cumbre Roads.. Results are expected in October of 2022.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 15,000,000 $15,000,000 $15,000,000
Total 0 0 0 0 0 0 0 15,000,000 $15,000,000 $15,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Castillo Undercrossing Bike & Ped Improv.

Description:

This project will implement significant safety enhancements to cycling and pedestrian infrastructure within the Castillo Street undercrossing at U.S. Highway 101, and along Castillo Street between Haley Street and Cabrillo Boulevard, and along Haley Street between Castillo and De La Vina Streets. This is an important connection to the West Downtown neighborhood for coastal access, and for City College students accessing downtown services and housing. The safety enhancements include raised/separated bike paths, widened sidewalks with new street trees to provide sidewalk separation and shade, pedestrian level lighting, and a shared/raised bike and pedestrian facility within the undercrossing to elevate cyclists out of the wet street. A shared path would be constructed along Castillo Street between Montecito Street and Cabrillo Boulevard, providing connectivity to the Pershing Park and Waterfront destinations.

Specific Plans or Policies Relating to this Project:

The Pedestrian Master Plan has policies placing priority on ensuring that Highway 101 crossings provide the highest quality pedestrian facilities possible. The Bicycle Master Plan identifies the need for bicycle facility connectivity through the undercrossing.

Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City. This project includes an identified Vision Zero Priority Corridor (Castillo), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

The City completed a grant funded planning effort in December 2022, which included extensive public outreach, and preliminary survey and design work. Per City Council’s direction, the City applied for an Active Transportation Program Cycle 7 Grant in June of 2024 to fund the project. The grant was not successful and City staff will apply again at the next program cycle in two years.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 19,502 40,340 0 0 0 0 0 13,637,000 $13,637,000 $13,696,842 Measure C (General Fund) 0 0 0 0 0 0 0 139,000 $139,000 $139,000 Total 19,502 40,340 0 0 0 0 0 13,776,000 $13,776,000 $13,835,842 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Chapala Street
Description:

This corridor improvement focuses on Chapala Street from Haley to Victoria Streets. Future improvements could include a Class 4 bikeway/cycle track. Also included is conceptual landscape and drainage design at the end of Chapala Street and Highway 101. The project could potentially require significant drainage structures to go under the highway at the end of the street.

Specific Plans or Policies Relating to this Project:

Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City. This project includes an identified Vision Zero Priority Corridor (Chapala), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

The Chapala Design Guidelines and Pedestrian Master Plan are the guiding documents for the project's design.

Capital Costs:

Status:

Chapala/Figueroa Streets Intersection were enhanced with a City Pavement Maintenance Project in fall 2024 in preparation for the Saturday Farmers Market Relocation Project. Cota and Canon Perdido Streets intersections are the last remaining intersections to be enhanced as well as improvements near Highway 101.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 2,600,000 $2,600,000 $2,600,000
Total 0 0 0 0 0 0 0 2,600,000 $2,600,000 $2,600,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Cliff Drive Urban HWY to Complete Street Project Description:

The Project addresses the community’s desires to transform this high-speed urban highway into a neighborhood serving street with enhanced mobility and improved safety, with multi-modal transit opportunities, providing strong connections between neighborhoods, schools, and parks. The project will add a new three-mile separated path for all ages and abilities on Cliff Drive from Arroyo Burro County Park to Castillo Street. In addition to the new path, the Project will construct 11 new crosswalks, safety enhancements to four existing crosswalks, and three new traffic signals along Cliff Drive. Safety features at crossings include curb extensions, median refuge islands, Rectangular Rapid Flashing Beacons, safety lighting, and high visibility crosswalk markings. In addition, it closes the final gap in the 30-mile long Coastal Bike Route from UCSB to Ventura County. The community's desire to transform Cliff Drive has a long history and the project scope reflects years of community supported outreach efforts.

Specific Plans or Policies Relating to this Project:

Just 19% of City streets accounted for 77% of severe injuries and fatalities (2010–2019). Cliff Drive, a Vision Zero Priority Corridor, ranks #2 for severe/fatal collisions and #4 for pedestrian and bike crashes. Three intersections in the project area are among the City's most dangerous. The project aligns with the General Plan Circulation Element, promoting mobility options where driving is a choice, not a necessity, as well as the Bicycle and Pedestrian Master Plans.

Capital Costs:

Status:

The City was granted an Active Transportation Program Cycle 6 Grant and is currently in the early design and environmental phase. The Project is anticipated to be constructed in 2027.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 496,268 1,407,935 1,216,000 24,087,000 0 0 0 0 $25,303,000 $27,207,203 Measure C (General Fund) 880,000 1,000,000 2,460,000 2,460,000 0 0 0 0 $4,920,000 $6,800,000 Highway Safety HSIP 0 0 0 946,000 0 0 0 0 $946,000 $946,000 Total 1,376,268 2,407,935 3,676,000 27,493,000 0 0 0 0 $31,169,000 $34,953,203 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: De La Guerra Plaza Revitalization Project Description:

De La Guerra Plaza celebrates and honors the historic heart of our City and provides the flexibility to serve our community’s diverse social, cultural, historic, economic and environmental vitality. Revitalizing the Plaza will give this important space an opportunity to once again function as a prominent public square and regain central focus as the heart of downtown Santa Barbara. A revitalized Plaza will involve expanding the available space by making structural and aesthetic improvements to better serve the community’s current arts and cultural events, such as Old Spanish Days. It will improve accommodations for future activities, including events within the food industry and a wider range of arts, cultural, and musical events.

Capital Costs:

Status:

The Plaza Revitalization Advisory Committee began meeting in 2019 and met 14 times through 2022 to help guide staff and the design team to bring together the many ideas for this Plaza, while tying in the historically significant influences surrounding it and creating a space that will facilitate events and activities. The Advisory Committee was made up of two members from each of the following: City Council, Historic Landmarks Commission (HLC), Planning Commission, and Parks & Recreation Commission. Additionally, the Executive Director of the Santa Barbara Trust for Historic Preservation is in the committee. The concept plan was reviewed multiple times by HLC and was developed to a point of comfort for a Planning Application to be submitted to Community Development for review. The Application was deemed complete, and the Project is currently in the middle of an Environmental Impact Report which will need to be completed prior to further design review by HLC, at which time the Public will be able to provide additional feedback. This public engagement and review will culminate in receiving Project Design Approval.

Construction Drawings and Building Permit submittal will follow, along with the Phase III Archaeology work at the Project site. Funding for this project will be a combination of sources: from Measure C, from community donations through the Santa Barbara Foundation, and other funding sources to lessen the burden on Measure C funding. A construction estimate based on the concept plan estimated the construction will cost approximately $16M.

Infrastructure: General Administration
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 509,960 1,347,229 250,000 500,000 17,400,000 180,000 180,000 0 $18,510,000 $20,367,189 Donations 0 0 0 0 0 0 0 0 $0 $0
Total 509,960 1,347,229 250,000 500,000 17,400,000 180,000 180,000 0 $18,510,000 $20,367,189 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Las Positas Active Trans. Improv. Study Description:

The Las Positas Active Transportation Improvement Study includes improvements for pedestrian and vehicle access along Las Positas Road between State Street and McCaw Road. Potential projects include adding a sidewalk along Las Positas Road, and changes in traffic control and intersection alignment at the McCaw/Las Positas Intersection.

Community outreach indicated a desire to have a longer-range plan that looked at the entire corridor.

There are limited crossing opportunities across Las Positas Road in the vicinity of the Samarkand neighborhood to get to Loreto Plaza or other destinations in the vicinity of Upper State Street. Sidewalk on the east side of Las Positas Road terminates just north of Stanley Drive and would be very expensive to extend to State Street. Grant funding was received to install a new crossing at the intersection of Las Positas Road and Stanley Drive, providing a connection to the west side of Las Positas Road where existing sidewalk and path continue to Upper State Street. Construction completion is anticipated in fall/winter 2024.

Overall, this improvement would provide enhanced pedestrian connectivity for the Samarkand neighborhood to nearby businesses and amenities. The effort will be phased.

Specific Plans or Policies Relating to this Project:

This sidewalk is a high priority sidewalk based on the Council Adopted Criteria for the Sidewalk Infill Program, but costs prohibit its construction through that program.

Capital Costs:

Status:

This study effort has not yet commenced due to lack of funding. Community outreach indicated a desire to have a longer-range plan that looked at the entire corridor.

From the freeway to State Street, it will be analyzed and constructed in phases pending grant outcomes. Study is anticipated to cost $500,000. Construction costs will depend on features supported by the community.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 500,000 $500,000 $500,000
Total 0 0 0 0 0 0 0 500,000 $500,000 $500,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Lower Eastside Highway 101 Overcrossing Description:

Highway 101 is a physical barrier to walking and bicycling, with approximately 1.25 miles between access points to cross it in the City’s Eastside Neighborhood, to get to the Eastside’s commercial corridor south of the freeway and to the Waterfront. Currently, coastal access from the Lower Eastside can involve circuitous routes to either Milpas Street or Cabrillo Boulevard, and pedestrians and cyslists are forced to navigate busy streets with freeway ramps. This project will study the feasibility of createing a new pedestrian and bicycle overcrossing of Highway 101 from the Lower Eastside neighborhood to the area of Dwight Murphy Field (soon to be rennovated), Park and the Santa Barbara Zoo, and several Waterfront destinations.

Specific Plans or Policies Relating to this Project:

The Pedestrian Master Plan has policies placing priority on ensuring that Highway 101 crossings provide the highest quality pedestrian and bicycle safety. A new crossing of Highway 101 from the Lower Eastside is identified in the Pedestrian Master Plan and will provide cyclists with a safer alternative than using Milpas Street.

Santa Barbara Vision Zero Project: In an effort to eliminate all serious and fatal traffic collisions on City streets, this project incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

An Active Transportation Program grant-funded planning effort was completed in 2024 with Ciy Council's adoption of the Lower Eastside Community Connectivity Active Transportation Plan, which includes this proposed project. Per City Council’s direction, the City applied for an Active Transportation Program Cycle 7 Grant in June of 2024 to fund the project. The grant was not successful. At City Council's direction in 2024, the City applied for an Active Transportation Program Grant-Cycle 7 and the grant was not successful. Staff will apply for an Active Transportation Program Grant again at the next program cycle in 2026.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 19,321 0 0 0 0 0 0 0 $0 $19,321
Grant 0 0 0 0 0 0 0 33,445,431 $33,445,431 $33,445,431
Total 19,321 0 0 0 0 0 0 33,445,431 $33,445,431 $33,464,752 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Lower Eastside Safety Enhancements
Description:

This project aims to enhance bicycle and pedestrian safety and accessibility for families in the Eastside by addressing infrastructure gaps along existing walking and biking routes. The project will provide enhanced pedestrian crossings at 12 intersections throughout the Eastside Neighborhood along routes to Franklin, Cleveland, and Adelante Elementary Schools, the Eastside Library, and Franklin Center. The pedestrian enhancements will also strengthen the bicycle network, providing better intersection sightline visibility and directing cyclists to lower volume streets with wayfinding.

Enhancements include:

A. Safe Routes to School Safety Enhancements including curb extensions for five intersections at Montecito/Voluntario, Montecito/Soledad, Quinientos/Voluntario, Quinientos/Soledad, Carpinteria/Soledad.

B. Cacique Bike Boulevard/Bike Friendly Street including curb extensions at Canada/Hutash, Canada/Punta Gorda and Voluntario/Cacique. This is a critical east-west parallel route to Highway 101.

C. Alisos Sidewalk Infill from Cacique to Hutash. New sidewalk connects to the Highway 101 Undercrossing at Cacique Street, connecting pedestrians to and from food and services along the Milpas Street Corridor and to the beach.

D. Salinas Street bicycle and pedestrian and lighting safety enhancements from Highway 101 Freeway Off-Ramp into the neighborhood.

Specific Plans or Policies Relating to this Project:

The proposed safety enhancements are proposed within the Lower Eastside Community Connectivity Active Transportation Plan (2024), is consistent with the City’s Council adopted Pedestrian Master Plan (2006), Bicycle Master Plan (2016), Eastside Neighborhood Transportation Management Plan (2015) and Vision Zero Strategy (2018) as well as SBCAG’s Regional Transportation Plan and Sustainable Communities Strategy.

Capital Costs:

Status:

The proposed safety enhancements were included in SBCAG/Caltrans SB-1 Cycle 3 grant application in 2022 and the grant was not awarded. At City Council's direction in 2024, the City applied for an Active Transportation Program Grant and the grant was not successful. SBCAG/Caltrans applied for SB-1 Cycle 4 grant for the project in November 2024 and it will be determined by the State if the grant is successful in June 2025.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 10,326,701 $10,326,701 $10,326,701
Total 0 0 0 0 0 0 0 10,326,701 $10,326,701 $10,326,701
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Milpas St Crosswalk Safety & SW Widening Project Description:

The project addresses the community needs for improved safety and accessibility for all road users. The Project realigns the curbs along Milpas Street to allow for construction of the following safety enhancements: new curb extensions, high visibility crosswalks, additional lighting, accessibility improvements, widened sidewalks at street corners and transit stops, leading pedestrian intervals at signalized intersections, mast arm mounted Rectangular Rapid Flashing Beacons, and a median refuge island at one non-signalized intersection. Three-foot-wide buffers will be added to the existing bike lanes between Cota and Canon Perdido Streets to improve cyclist safety, and additional bicycle parking on Milpas Street will improve cyclist access.

Specific Plans or Policies Relating to this Project:

The project is a solution to resident concerns that came out of the Milpas Corridor Planning Effort. The project is consistent with the General Plan Circulation Element, Pedestrian Master Plan, Bicycle Master Plan, and Vision Zero Strategy. Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City. This project is in an identified Vision Zero Priority Corridor (Milpas), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

Public Engagement for the Milpas Corridor Planning Effort was held from October of 2019 to January of 2022, and the approaches to residents' concerns were brought to City Council for direction. Per City Council’s direction, the City applied for an Active Transportation Program Cycle 6 Grant in June of 2022 to fund the above improvements. The City was granted an Active Transportation Program Cycle 6 Grant and is currently in the early design and environmental phase. The Project is anticipated to be constructed in 2027.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 60,385 109,904 750,000 750,000 0 0 0 0 $1,500,000 $1,670,289 Grant 375,808 621,522 275,000 6,720,000 0 0 0 0 $6,995,000 $7,992,330 Highway Safety HSIP 0 0 0 431,000 0 0 0 0 $431,000 $431,000 Total 436,193 731,426 1,025,000 7,901,000 0 0 0 0 $8,926,000 $10,093,619 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Milpas/101 Operational Improvments
Description:

The Milpas Street at U.S. Highway 101 Operational Improvements Project is critical to the success and safe operation of the U.S. Highway 101 Widening Project (HOV Project) and will address expected traffic impacts from the HOV Project. This Project will improve traffic operations along Milpas Street between the U.S. Highway 101 southbound on- and off-ramps and will include the following improvements:
- Widening Milpas Street at the northeast corner of the intersection of Milpas and Hutash Streets to provide space for a new dedicated southbound left-turn lane onto eastbound Hutash Street. This will allow U.S. Highway 101 on- and off-ramp traffic to move concurrently when there is no traffic queued in the new left turn lane;
- Traffic signal modifications at the intersection of Milpas and Hutash Streets to optimize signal phasing and reduce wait time at intersections;
- Extending the existing median south of the U.S. Highway 101 underpass to the intersection of Milpas and Cacique Streets to prohibit left-turns from southbound Milpas Street onto eastbound Cacique Street.

This will help prevent southbound off-ramp traffic from queueing onto southbound U.S. Highway 101.

Eastbound Cacique Street will have access from northbound Milpas Street via the hook off-ramp; and - Installation of an elevated bike lane along Milpas Street between Cacique and Hutash Streets. This facility was a community-requested safety need to separate cyclists from vehicles due to the high traffic volumes in this area.

Specific Plans or Policies Relating to this Project:

Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City. This project is in an identified Vision Zero Priority Corridor (Milpas), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

The project will add a third southbound left-turn lane that will be funded as part of the Caltrans/SBCAG freeway widening mitigation plan. The City will be delivering the project ahead of the US Highway 101 HOV Project. A project to add a second northbound lane over the railroad tracks is not funded. Construction is anticipated to start in 2025.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Caltrans 129,624 1,477,668 0 0 0 0 0 0 $0 $1,607,292
Total 129,624 1,477,668 0 0 0 0 0 0 $0 $1,607,292
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Mission & State Streets Lighting Corridor Description:

The project consists of addressing a pattern of nighttime injury collisions along Mission Street and State Street through the installation of roadway lighting. The proposed project would introduce a lighting corridor along Mission Street, between Gillespie Street and Anacapa, and on State Street, between Arrellaga Street and Mission Street. This countermeasure to nighttime collisions would improve safety by making drivers more aware of their surroundings and enhancing available sight distances.

Specific Plans or Policies Relating to this Project:

Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City. This project is in an identified Vision Zero Priority Corridor (Mission and Upper State), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

This project is funded by the Highway Safety Improvement Program (HSIP). Construction is planned for fiscal year 2025.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 2,274,800 0 0 0 0 0 $2,274,800 $2,274,800
Total 0 0 2,274,800 0 0 0 0 0 $2,274,800 $2,274,800
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Mission Canyon Corridor Improvements
Description:

The Mission Canyon Corridor Multimodal Improvements Project is a community generated project, which could include a pedestrian connection along the west side of Los Olivos Street and Mission Canyon Road, beginning at the Old Mission Santa Barbara steps, crossing Mission Creek, and traveling north to Foothill Road in Santa Barbara County, and intersection safety improvements.

A study and community outreach effort was completed in cooperation with Santa Barbara County. During these efforts, safety concerns were raised regarding the lack of pedestrian facilities between the Old Mission Santa Barbara and the Santa Barbara Natural History Museum. A community consensus emerged for the westerly pathway. City Council directed staff in February of 2015 to add this project to the CIP and work jointly with the County to fund it.

Specific Plans or Policies Relating to this Project:

Improving pedestrian access in and around the Mission by providing safe and attractive walking connections between the Mission, Rocky Nook Park, and the Natural History Museum is listed in the Circulation Element as Implementation Strategy 5.1.2.

Capital Costs:

Status:

City and County Staff completed a conceptual design in Fiscal Year 2013/2014. Staff submitted a joint application for an Active Transportation Program grant requesting funding for design and environmental approval. The grant proposal was not successful and, based on the project’s ranking, it is not anticipated to be successful in the foreseeable future. There was a separate effort to evaluate rehabilitation of the Mission Canyon Bridge that would also incorporate bicycle and pedestrian amenities into the bridge design. Council in August of 2021 directed staff to not proceed with the bridge rehabilitation and to focus on a freestanding pedestrian/bicycle bridge adjacent to the vehicle bridge. Council formed an ad hoc committee in 2022 but meetings have not commenced due to Council/staff priorities on other work efforts. $50,000 of funding has been set aside in FY26 from the Streets Fund to fund a facilitator for the Ad Hoc Committee process and community engagement. The pedestrian/bicycle bridge's concept design, environmental/technical review, final design, and construction is anticipated to cost $12M and there is no likely funding source identified at this time.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 12,000,000 $12,000,000 $12,000,000
Measure C (General Fund) 0 0 50,000 0 0 0 0 0 $50,000 $50,000 Total 0 0 50,000 0 0 0 0 12,000,000 $12,050,000 $12,050,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Safe Streets for All Action Plan
Description:

The City was awarded Safe Streets and Roads for All (SS4A) Planning Grant in the amount of $799,400 with a required twenty percent City-match to prepare a SS4A Action Plan (Action Plan) from the U.S.

Department of Transportation. The goal of the Action Plan is to prevent traffic related fatalities and serious injuries within the City, while increasing safe, healthy, and equitable mobility for all by strategically identifying infrastructure improvements that remove barriers to safe mobility.

This Action Plan will:
• Document and map completed and funded infrastructure improvements along the City’s existing Vision Zero High-Priority Corridors. The map will also show the City’s existing and funded active transportation network.
• Perform updated Safety Analysis to identify if any changes or additions are needed to the City’s Vision Zero High Priority Corridors.
• Identify underserved communities that will include equity impact assessments of traffic collision data, proposed projects, and strategies.
• Conduct and document robust community and stakeholder engagement and collaboration. • Update policies and processes to improve prioritization of transportation safety. • Identify safety countermeasures to reflect best practices that could be easily incorporated with pavement maintenance, City capital and/or land development projects. • Develop short-, mid-, and long-term projects to improve safety. Preliminary survey and cost estimates are included to prepare for future funding opportunities for a few selected projects. • Update Safe Routes to School Maps and identify additional safety enhancements along the routes.

Specific Plans or Policies Relating to this Project:

The Action Plan builds upon the efforts from the Council adopted Pedestrian (2006) and Bicycle (2016) Master Plans, and the Santa Barbara Vision Zero Strategy (Vision Zero).

Capital Costs:

Status:

The City has been coordinating with USDOT and local state representatives to finalize the agreement necessary to begin the work efforts in fall of 2024, with Action Plan completion by September 2026
Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 799,400 0 0 0 0 0 0 $0 $799,400
Transportation Development Act 0 199,850 0 0 0 0 0 0 $0 $199,850 Total 0 999,250 0 0 0 0 0 0 $0 $999,250
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: State Street Master Plan – Grand Paseo Redesign Description:

The State Street Master Plan covers the area from Sola Street to the U.S. 101 underpass and Chapala Street to Anacapa Street, about 1 mile long and 0.4 miles wide. The project tackles economic challenges, builds on past ideas, aligns with major City efforts, and incorporates lessons from the COVID-19 reconfiguration. It aims to create a vibrant destination celebrating Santa Barbara’s community, history, and architecture. Downtown State Street will feature art, landscaping, community spaces, shopping, dining, and will provide a streetscape that encourages additional residential units to be built downtown.

The plan prioritizes pedestrian-friendly spaces and diverse transportation options, creating a Grand Paseo for community gatherings and civic life. It emphasizes sustainability, flexibility, and resilience.

Key elements include stormwater management, sustainability features, landscaping, street furniture, lighting, pavement themes, art, play areas, traffic improvements, bike paths, retractable bollards, fire access, and expanded sidewalks.

Specific Plans or Policies Relating to this Project:

City Council directed a planning effort to reevaluate the future of State Street. With Council approval, State Street moved to an interim configuration which currently consists of planters, bollards, on-street center bike lanes/emergency access, and in-street outdoor dining. The interim configuration is approved through December 2026 or until a State Street Master Plan is adopted.

Capital Costs:

Status:

The visioning effort was completed in 2021 and Council advised to move forward with a State Street Master Plan, and the establishment of the State Street Advisory Committee to provide input on the master planning effort. City Staff contracted with MIG to continue community outreach efforts, create conceptual designs and an implementation plan, and finalize a community supported plan. Local design professionals have also contributed to plan development. To date, a project scope has not been identified but anticipated costs are in the $40-80 million dollar range.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 80,000,000 $80,000,000 $80,000,000
Total 0 0 0 0 0 0 0 80,000,000 $80,000,000 $80,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Upper State Street
Description:

Upper State Upper State Street Intersections Enhancements:

Reconstruct intersections and pedestrian crossings to make the intersections more attractive and upgrade intersections to meet new accessibility standards and Pedestrian Master Plan streetscape standards along five intersections. The project also includes study and possible safety improvements at private driveways with a repeated collision pattern.

Upper State Streetscape Improvements Program:

A Streetscape Improvements Program, such as the one identified in the Upper State Street Report would include a right of way study, locations, and dedications. Completion of design solutions can then attract outside funding sources, including projects.

Upper State Street Sidewalk Expansion Program:

Expand State Street sidewalk to 15 feet. Currently, parcels do not have appropriate amount of space to accommodate new standards, a proactive process requires financing and cooperation from property and business owners.

Specific Plans or Policies Relating to this Project:

These projects are implementation items included in the City Council adopted Upper State Street Study and Guidelines.

Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City. This project is in an identified Vision Zero Priority Corridor (Upper State Street), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

Currently there is no funding identified to implement projects called out in the Upper State Street Study. In the meantime, most right of way improvements will be tied to private land development projects.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 20,000,000 $20,000,000 $20,000,000
Total 0 0 0 0 0 0 0 20,000,000 $20,000,000 $20,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Corridor Improv: Westside & Lower West Active Transportation Plan Description:

The Westside and Lower West Neighborhood Active Transportation Plan Implementation Project will provide safe pedestrian and bicycle routes to schools, parks, and neighborhood services, and complete major infrastructure gaps. The Project will provide a one-mile all ages and abilities protected bike path adjacent to La Cumbre Junior High and Santa Barbara Community Academy, completing a missing gap between the Las Positas/Modoc Multiuse Path and the neighborhood bike boulevards. The bike lanes and bicycle boulevard features will close a gap between the Westside and Lower West, providing a much needed continuous and connecting route through the neighborhoods. The Project will also include the following pedestrian safety enhancements: sidewalk infill on six streets to complete safe walking routes to school and provide access to important destinations, such as the Westside Community Center and the Boys & Girls Club; construction of curb extensions, refuge islands, Rectangular Rapid Flashing Beacons (RRFBs); and new pedestrian-scale sidewalk lighting along San Andres Street.

Specific Plans or Policies Relating to this Project:

The project is consistent with the General Plan Circulation Element, Pedestrian Master Plan, Bicycle Master Plan, and Vision Zero Strategy. Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City.

This project is in an identified Vision Zero Priority Corridor (San Andres), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

City Council adopted the Westside and Lower West Neighborhood Transportation Management Plan in March 2020 and directed the City to apply for an Active Transportation Program Cycle 6 Grant. The City was granted an Active Transportation Program Cycle 6 Grant and is currently in the early design and environmental phase. The Project is anticipated to be constructed in 2027.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 21,960 1,903,040 1,100,000 16,157,000 0 0 0 0 $17,257,000 $19,182,000 Measure C (General Fund) 0 75,000 1,029,000 1,029,000 0 0 0 0 $2,058,000 $2,133,000 Total 21,960 1,978,040 2,129,000 17,186,000 0 0 0 0 $19,315,000 $21,315,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Drainage: Citywide Drainage Assessment
Description:

Comprehensive condition assessment for all City maintained drainage facilities. Included in this work will be a video inspection and condition rating for every pipe segment, as well as inlet, junction, and outfall structures. The effort will result in a prioritization of future maintenance needs. Results will be updated into the City GIS database.

Specific Plans or Policies Relating to this Project:

A Citywide drainage assessment is overdue and is needed to prioritize repairs.

Capital Costs:

Status:

A drainage assessment for the Laguna and Mission Creek drainage areas was completed in two phases. The first phase of the drainage assessment was a discovery phase, which identified and located specifically identified portions of the drainage network in the Laguna Channel and Mission Creek drainage areas. The second phase performed a Pipeline Assessment Certification Program (PACP) coding on the pipe system. Over the next years, staff will be extending the same process to the remaining drainage areas in the City. City staff is prioritizing the results of these phases and putting together projects to repair the most vulnerable and damaged storm drains. In FY 2024 the City purchased CCTV equipment and dedicated a FTE to perform the video inspections and condition assessments.

Infrastructure: Roadway Infrastructure
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 151,000 650,000 0 250,000 300,000 300,000 300,000 3,000,000 $4,150,000 $4,951,000 Total 151,000 650,000 0 250,000 300,000 300,000 300,000 3,000,000 $4,150,000 $4,951,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Drainage: Citywide Drainage Maintenance and Improvements (Annual) Description:

Annual program to repair, maintain, and perform minor improvements to public drainage facilities. The Public Works Department maintains and regularly updates a Storm Drain capital improvement projects list. The list includes recommended drainage improvements and repairs based on input from City staff and the public.

Projects are developed from the Citywide Drainage Assessment program. The Assessment Program provides a priority list in which the CIP will be developed and addressed with this program. Smaller projects as well as unforeseen drainage repair projects (resulting from fire, flood, etc.) are typically funded out of this annual program.

An additional revenue source would likely be required in order to fund the cost for completion of a Citywide assessment and to perform all required maintenance/repairs.

Specific Plans or Policies Relating to this Project:

Storm Drain Capital Improvement Project list includes over $10 million in proposed improvements.

Capital Costs:

Status:

Annual, ongoing program. Drainage funds are typically only available for urgent repairs due to failures of existing storm drain infrastructure identified during the fiscal year. Once the drainage assessments are complete, an individual capital project will be developed and maintenance projects will be programmed.

Infrastructure: Roadway Infrastructure
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 575,000 400,000 0 250,000 1,000,000 1,000,000 1,000,000 5,000,000 $8,250,000 $9,225,000 Total 575,000 400,000 0 250,000 1,000,000 1,000,000 1,000,000 5,000,000 $8,250,000 $9,225,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Drainage: Laguna Pump Station and Tide Gate Relocation Project Description:

The City of Santa Barbara’s Laguna Channel Pump Station (Pump Station) and Laguna Tide Gates (Tide Gates) are in need of relocation to successfully address sea-level rise and reduce the impacts of runoff flooding. The City needs to analyze alternatives, costs, and hydraulic benefits of potential sites for the Pump Station. Relocating the Pump Station and Tide Gates will allow for the restoration of the concrete channel to a more naturalized estuarine habitat. The project would include an alternatives analysis for the future tide gate and pump station relocation comparing several potential locations with a no-action alternative. The project would study applicable parameters such as acquisition cost, environmental factors, hydrological benefits, channel control forfeiture costs, ecological benefit, public engagement, storm frequency flooding prevention, and preliminary construction cost estimates. The project would consider the advantages and disadvantages of these parameters in accordance with predicted sea-level rise. Ultimately, these studies would inform a design and construction for the Pump Station and Tide Gates.

Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan
Capital Costs:

Status:

The City has previously invested in science-based solutions that analyzed the impacts of sea-level rise on the Pump Station and Tide Gates, and would now like to fund the study that will lead to an informed, ecosystem-based protection and conservation solution to relocate the pump station and tide gates. The Project, when constructed, will protect California’s coast and ocean by restoring estuary and retreating critical infrastructure from rising sea levels. The combination of the prior City efforts involved collaboration with City Public Works, Parks and Recreation, and Waterfront Departments with the adoption of the City of Santa Barbara Sea-Level Rise Adaptation Plan creates a strong foundation for the future of the Laguna Pump Station, associated estuary, and benefits the disadvantaged residents upstream.

Future grant funding will be sought for the alternatives analysis, followed by design and construction of the project.

Infrastructure: Public Safety
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 20,000,000 $20,000,000 $20,000,000
Total 0 0 0 0 0 0 0 20,000,000 $20,000,000 $20,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Drainage: Laguna Pump Station Repairs
Description:

The project involves rehabilitating the Laguna Pump Station Facility. This facility is a critical City facility that is essential in minimizing the impact of flooding in the low-lying neighborhoods between Laguna and Milpas Streets. The Facility was constructed on the ocean side of Cabrillo Boulevard in 1939 and expanded in the 1960s. Recent engineering reports have identified the Facility as having compromised structural integrity due to cracked concrete and settlement of the channel wall and building slabs along with corrosion, which increases the risk of reduced function for the Facility, especially under seismic loadings.

Specific Plans or Policies Relating to this Project:

The Laguna Drainage System Improvement Study (2007) included recommendations to improve the Laguna Pump Station.

Capital Costs:

Status:

Based on the recommendation from the Laguna Drainage System Improvement Study, the City applied for and received FEMA Hazard Mitigation Grant Program grant funds. The project completed its Design Phase and construction is anticipated in the summer of 2023.

Infrastructure: Roadway Infrastructure
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 17,000 1,200,000 0 0 0 0 0 0 $0 $1,217,000 Grant 50,000 3,124,000 0 0 0 0 0 0 $0 $3,174,000
Measure A 0 2,200,000 0 0 0 0 0 0 $0 $2,200,000
Total 67,000 6,524,000 0 0 0 0 0 0 $0 $6,591,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Drainage: Lower Mission Creek Improvements
Description:

Coordinate, design, and construct flood control improvements on Mission Creek from the ocean upstream to Canon Perdido Street to handle 20-year peak floods using the US Army Corps of Engineers design, in cooperation with the County of Santa Barbara Flood Control. The City and County are committed to moving forward with completing the design and construction of the project with grants and local funds in affordable increments of work, due to the benefits of increased flood protection and providing creek rehabilitation.

Specific Plans or Policies Relating to this Project:

The improvements are consistent with the Army Corps Lower Mission Creek flood control project that has been designed to provide a capacity of 3,400 cfs.

Capital Costs:

Status:

The bypass culvert (Reach 2B) under the Union Pacific Railroad tracks was completed in 2009. Reach 1A,1B, and 2A were completed in 2011, 2015, and 2017 respectively. The County is finalizing construction of Reach 2B Phase 2 and Reach 3. The funding information provided below only accounts for the City share of this joint project. City funds are used for city permit fees, staff time to coordinate with the County and to apply for Grant funds to complete portions of this project.

Ongoing efforts in FY23 and beyond include coordination and cost sharing with the County on various reaches of the project.

Infrastructure: Roadway Infrastructure
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure A 30,500 81,130 20,000 20,000 20,000 20,000 20,000 100,000 $200,000 $311,630 Total 30,500 81,130 20,000 20,000 20,000 20,000 20,000 100,000 $200,000 $311,630 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Drainage: Lower Sycamore Creek Drainage Improvements
Description:

The project goal is to increase flood capacity on Sycamore Creek from above US Highway 101 downstream to the ocean. The purpose of this work is to minimize the potential for flooding adjacent to Sycamore Creek by achieving the system design capacity of 3,000 cubic feet per second.

In order to complete the project, several steps will be required, including:

1. Study drainage on Lower Sycamore Creek from above US Highway 101 downstream to the ocean.

2. Evaluate and prioritize flood control projects for funding.

3. Coordinate with Caltrans regarding modifications to their US Highway 101 bridge at Sycamore Creek.

4. Design and construct channel and bridge improvements.

The funding scenario assumes that City downstream improvements would be required prior to Caltrans modifying their US Highway 101 bridge at Sycamore Creek.

Note that the Sustainbility and Resilience Department to partner on phase I of impovements downstream of Highway 101 (see also separate CIP project entry under Sustainability and Reslience) Specific Plans or Policies Relating to this Project:

The Sycamore Creek Flood Capacity Master Plan, completed for Santa Barbara County Flood Control, calls for Sycamore Creek to achieve a system capacity of 3,000 cubic feet per second. This plan was used to set the capacity of the US Highway 101 Bridge over Sycamore Creek.

Capital Costs:

Status:

Caltrans has completed the US Highway 101 Operational Improvement Project, which included increasing the capacity of Sycamore Creek under US Highway 101.

The City completed channel improvements upstream of US Highway 101 and replaced the Punta Gorda Street Bridge. Staff will explore grant funding to increase the system capacity including improvements downstream of US Highway 101 and replacement of the Hutash Street Bridge upstream. Staff is currently working in coordination with the County to make updates to the Sycamore Creek Master Plan to reflect recent and upcoming projects on Sycamore Creek.

Infrastructure: Roadway Infrastructure
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 30,000,000 $30,000,000 $30,000,000
Measure C (General Fund) 0 0 0 0 0 0 0 6,000,000 $6,000,000 $6,000,000 Total 0 0 0 0 0 0 0 36,000,000 $36,000,000 $36,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Drainage: Pedregosa Area Storm Drain
Description:

The project is proposed to solve drainage problem along Pedregosa Street to De La Vina Street. The affected area is from Mission Creek to Sheridan Avenue.

Phase 1A consists of replacing the existing storm drain outlet from near the intersection of Castillo and Islay Streets to Mission Creek. This involves approximately 135 linear feet of culvert construction ranging from an 8-foot by 6-foot concrete box to 54-inch diameter reinforced concrete pipe. Streets Operations repaired the invert of the storm drain in 2022.

Phase 1B consists of the design and construction of 1,335 linear feet of new drainage pipe from near the intersection of Pedregosa and Sheridan to the upstream end of Phase 1A at Castillo and Islay.

Additional phases will extend the storm drain pipe to the 1900 block of De La Vina Street.

Specific Plans or Policies Relating to this Project:

City Drainage Master Plan calls for a storm drain system with a 25-year design capacity. The County of Santa Barbara Local Hazard Mitigation Plan includes the Pedregosa Storm Drain project as FLD-4.

Capital Costs:

Status:

This project was originally planned as a cooperatively funded project of the County Flood Control and the City. Phase 1A was bid in June 2006, with an engineer's estimate of approximately $300,000. Only one bid was received, at nearly $500,000, and the project was not awarded. Drainage funds have since been used for other priorities. For Phase I, Public Works will pursue re-bidding this project in the event that grant funding or a cost sharing agreement with County Flood Control can be secured to cover 50% of the cost for construction. Phase 1B will be added to the CIP following completion of Phase 1A.

Infrastructure: Roadway Infrastructure
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 10,000,000 $10,000,000 $10,000,000
Total 0 0 0 0 0 0 0 10,000,000 $10,000,000 $10,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Drainage: Salsipuedes Street Storm Drain Improvements
Description:

This project first involves the study of existing public and private storm drain facilities beginning on Salsipuedes Street at Micheltorena Street and continuing south to Salsipuedes Street at Victoria Street.

Potential improvements recommended by the study include connection of storm drain inlets on Micheltorena Street to City a storm drain running south along Salsipuedes Street as well as construction of a new storm drain pipe along Salsipuedes and Victoria streets. The proposed drain would be installed on Salsipuedes Street to Victoria Street, then extend west for approximately 165 feet, discharging to the natural drainage course south of Victoria Street.

Specific Plans or Policies Relating to this Project:

The Victoria drain study and concept design was completed in September 2001 by a consultant.

City Drainage Master Plan calls for a storm drain system with a 25-year design capacity.

Capital Costs:

Status:

Public Works will pursue completion of an initial study and design for this project in the event that grant funding or a cost sharing agreement with County Flood Control can be secured to cover 50% of the cost for construction.

Infrastructure: Roadway Infrastructure
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 0 0 0 0 0 0 0 600,000 $600,000 $600,000 Grant 0 0 0 0 0 0 0 600,000 $600,000 $600,000
Total 0 0 0 0 0 0 0 1,200,000 $1,200,000 $1,200,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Intersection Improvements: All Way Stop Replacement Program Description:

This project will include a study of the impact of replacing all-way stops in Santa Barbara with compact roundabouts. The benefit will be reduced congestion and stops, and improved travel time along major corridors within the grid area. Locations that would likely benefit most include:

Arrellaga corridor: Arrellaga/Castillo, Arrellaga/Bath Anacapa corridor: Anacapa/Mission Santa Barbara Street corridor: Santa Barbara/Los Olivos, Santa Barbara/Mission, Santa Barbara/Valerio, Garden corridor: Garden/Carrillo, Garden/Canon Perdido, Garden/De La Guerra, Garden/Ortega, Garden/Cota
Anapamu corridor: Anapamu/Laguna, Anapamu/Olive, Anapamu/Alta Vista Salinas corridor: Salinas/Carpinteria
Specific Plans or Policies Relating to this Project:

Project would reduce congestion, which is consistent with the City's Circulation Element.

Capital Costs:

Status:

The project is currently an unfunded need. Staff is exploring various funding opportunities.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 3,550,000 $3,550,000 $3,550,000
Total 0 0 0 0 0 0 0 3,550,000 $3,550,000 $3,550,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Intersection Improvements: Intersection Improvement Plan Description:

Per Plan Santa Barbara Environmental Impact Report, Mitigation Measure, 1.c. Develop an Intersection Master Plan to Address Problem Intersections. The first step would be to conduct a follow-up study to rerun the traffic model to identify current and future deficiencies and determine which intersections were studied. This step was completed in 2024, where 27 intersections were identified.The second step would be to study the intersections identified in the first step.

Specific Plans or Policies Relating to this Project:

Plan Santa Barbara Environmental Impact Report Mitigation Measures.

Capital Costs:

Status:

Studying the intersections identified in step 1 is not funded. Intersection capacity improvements are likely to range in the millions to hundreds of millions for each impacted intersection. Under the City's Traffic Management Strategy, a single land development project cannot add more than one percent of capacity to an impacted intersection. The City will continue to explore safety related grant funding for any of the intersections or intersection corridors that have a pattern of high injury collisions.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0########### $100,000,000 $100,000,000 Total 0 0 0 0 0 0 0 100,000,000 $100,000,000 $100,000,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Intersection Improvements: Railroad Crossings
Description:

Improve safety at Santa Barbara’s railroad crossings. Specific locations and features include:

Montecito Street: sidewalk, pedestrian channelization, approach median.

Anacapa Street: sidewalk, pedestrian channelization, approach median.

Garden Street: pedestrian channelization, possible queue cutter signal.

Calle Cesar Chavez: pedestrian channelization.

Milpas Street: advanced preemption.

Specific Plans or Policies Relating to this Project:

Coastal access requires crossing the railroad in much of the City. These improvements will improve safety for all modes of transportation.

Capital Costs:

Status:

This project is not funded. Possible funding sources include the Section 130 funds administered by the California Public Utilities Commission.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 2,500,000 $2,500,000 $2,500,000
Total 0 0 0 0 0 0 0 2,500,000 $2,500,000 $2,500,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Intersection Improvements: State Street at Constance Avenue Description:

Intersection improvements at State Street and Constance Avenue to reduce delay and improve pedestrian access. This all-way stop controlled intersection currently operates at a Level of Service E during peak hours, and delays are expected to double as housing is added to upper State Street. Also, this intersection ranks high for the number of angle collisions. Improvements will include a new traffic signal or roundabout, and geometric changes to maximize efficiency and safety.

Increase traffic demands that may justify traffic control changes at the nearby intersections of Anacapa Street and Constance Avenue, and Santa Barbara Street and Constance Avenue.

Specific Plans or Policies Relating to this Project:

This location was identified in the Transportation Congestion Relief Program application in the mid-1990s.

Santa Barbara Vision Zero Priority Corridor Project: 25 corridors in the City (2010-2019), or just 19% of City streets, are responsible for 77% of all severe injuries and fatalities in the City. This project is in an identified Vision Zero Priority Corridor (Upper State Street), and incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

The project has not yet commenced due to lack of funding.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 8,000,000 $8,000,000 $8,000,000
Total 0 0 0 0 0 0 0 8,000,000 $8,000,000 $8,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Intersection Improvements: Traffic Safety/Capacity (Annual) Description:

Annual program to select appropriate and cost-effective operational and safety improvements at suitable locations based on traffic count/delay data collected, traffic collision history, public complaints, and professional concern. Typical improvements performed under this category include hardscape improvements, signs or pavement marking changes, minor traffic signal changes, and raised pavement markings. This program will fund low-cost improvements, or may be used as a local match for larger grant funded projects.

Specific Plans or Policies Relating to this Project:

The project is based on operational/safety reviews, public complaints, and professional concern. The objective is to identify opportunities to improve traffic flow and improve safety.

Capital Costs:

Status:

This program account is currently being used as a local match for grant-funded projects, and to provide funding for repair and upgrades to past traffic safety projects such as pedestrian activated flashers and digital speed signs.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure A 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 $300,000 $400,000 Total 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 $300,000 $400,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Maintenance: Pavement Maintenance (Annual)
Description:

The project is for the annual street pavement maintenance needs thourught the City. The City's roadway network consists of 256 centerline miles. Work under this project includes a varierty of maintenance activities ranging from pothole repairs and sealing of cracks up to complete reconstruction. Methods are selected based on a varitey of factors including traffic volumes, as appropriate to maintain an acceptable driving surface.

Funding for this project comes from a variety of sources including Measure A, Utility User's Tax, State Gas Taxes, Measure A, Senate Bill 1 (SB1) funds, the City’s annual allotment of Local Surface Transportation Program (LSTP) funds.

In an effort to eliminate all serious and fatal traffic collisions on City streets, this project incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Specific Plans or Policies Relating to this Project:

Council goal is to maintain City pavements at an average Pavement Condition Index (PCI) of 70 or higher. Government Accounting Standards Board (GASB) 34 PCI goal is a minimum of 60.

Capital Costs:

Status:

The City's average PCI as of January 1, 2015 was 67. Recent budget scenarios that calculated a ratio between the net present cost of annual maintenance to future PCI resulted in a recommenation to fund the program at $25M for the next 8 years and then $10M for the following 12 years. This approach produces the best overall result for the City at the lowest cost. Under this recommended funding scenario, the average City PCI would reach 78 after year 8.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Streets Capital 2,527,777 3,348,304 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 11,000,000 $22,000,000 $27,876,081 Measure C (General Fund) 12,738,995 15,000,000 6,000,000 7,000,000 27,004,000 28,121,600 29,246,464########### $197,372,064 $225,111,059 Grant 344,717 683,026 345,000 345,000 345,000 345,000 345,000 1,725,000 $3,450,000 $4,477,743 Total 15,611,489 19,031,330 8,545,000 9,545,000 29,549,000 30,666,600 31,791,464 112,725,000 $222,822,064 $257,464,883 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Maintenance: Sandstone Retaining Walls Study
Description:

The project is to conduct studies to identify the location, size, and condition of all the sandstone retaining walls throughout the City and develop a replacement plan as needed. The study would also consider rebuilding the retaining walls out of different materials (sandstone finish would still remain) and would require community involvement, as well as discussions with a number of City committees. A repair/replacement plan prioritizing each wall's structural integrity will be developed. A budget for the work to be performed each year until all walls have been inspected, repaired, or replaced will also be developed.

Estimated cost for a study is $500,000.

Estimated future costs to repair the retaining walls are in the millions over the next 20-25 years.

Specific Plans or Policies Relating to this Project:

Various historic sandstone retaining walls may be structurally compromised. An investigation is needed to determine structural integrity of the walls and whether or not repair or replacement is recommended and approximate cost.

Capital Costs:

Status:

The project has not yet commenced due to lack of funding. A condition assessment and inventory is planned.

Infrastructure: General Administration
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 0 0 0 0 500,000 25,000 25,000 125,000 $675,000 $675,000 Total 0 0 0 0 500,000 25,000 25,000 125,000 $675,000 $675,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Maintenance: Sidewalks (Annual)
Description:

This annual program is for the replacement of existing sidewalks that have uplifted or depressed due to tree root or other damage. Each year, work is identified Citywide, so that all areas typically see some repairs annually. There are over seven million square feet of sidewalk in the City.

Specific Plans or Policies Relating to this Project:

City of Santa Barbara Pedestrian Master Plan Policy 1.7 states, "The City shall maintain, protect, and improve sidewalk facilities on an on-going basis and during public and private construction projects."
Capital Costs:

Status:

Annual, ongoing program.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 600,000 1,150,000 200,000 250,000 1,150,000 1,150,000 1,150,000 1,150,000 $5,050,000 $6,800,000 Total 600,000 1,150,000 200,000 250,000 1,150,000 1,150,000 1,150,000 1,150,000 $5,050,000 $6,800,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Maintenance: Streetlight Pole Painting
Description:

Painting decorative streetlight and traffic signal poles.

Specific Plans or Policies Relating to this Project:

Maintenance is an essential practice to prevent corrosion and thereby maintaining structural integrity of streetlight and traffic signal poles.

Capital Costs:

Status:

Repainting the City’s decorative streetlight and traffic signal poles prevents corrosion and maintains the appearance. Painted streetlight and traffic signal poles should be repainted every seven to ten years. Poles near the coast are susceptible to corrosion, while poles away from the coast are repainted for appearance. A ten year painting cycle will cost between $75,000 and $100,000 annually. Focusing on streetlight and traffic signal poles close to the coast to prevent corrosion will significantly reduce the cost.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 0 0 100,000 100,000 100,000 100,000 100,000 100,000 $600,000 $600,000 Total 0 0 100,000 100,000 100,000 100,000 100,000 100,000 $600,000 $600,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Active Transportation Program
Description:

Specific active transportation project(s) and project scope will be determined on safety issues, community need, safe routes to school, and level of funding secured. Since safety is one of the primary drivers of the program, possible future Vision Zero projects may also be considered for grant funding.

Specific Plans or Policies Relating to this Project:

Projects are required to be consistent with the City's Pedestrian Master Plan, Bicycle Master Plan and Vision Zero Strategy.

Capital Costs:

Status:

The Safe Routes to School Program has now been rolled into the State's Active Transportation Program. All specific safe routes to school projects are currently named projects in the Capital Program. The Active Transportation Program is to allow for concept design and preliminary investigation to potential active transportation projects that have not been specifically named yet in the Capital Program.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 400,000 400,000 400,000 400,000 $1,600,000 $1,600,000 Measure C (General Fund) 0 0 0 0 100,000 100,000 100,000 100,000 $400,000 $400,000 Total 0 0 0 0 500,000 500,000 500,000 500,000 $2,000,000 $2,000,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Crosswalk Improvements
Description:

The project will improve crosswalks at locations that have been identified as challenging for pedestrians to cross or have a demonstrated history of pedestrian involved collisions. Improvements will vary by location, but generally include hardscape, pedestrian activated flashers, and pedestrian safety lighting.

Specific Plans or Policies Relating to this Project:

Policy 1.2 of the Pedestrian Master Plan states" The City shall improve pedestrian safety and comfort at intersections.” Santa Barbara Vision Zero Project: In an effort to eliminate all serious and fatal traffic collisions on City streets, this project incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

Grant funding is typically pursued when locations have been identified. Unfunded and identified needs include the school crosswalks at Hope School (La Colina Road) and Monte Vista School (Hope Avenue). Funding applications through the Highway Safety Improvement Program are pending for Hope School (La Colina Road), Monte Vista School (Hope Avenue), crosswalks at the Milpas Roundabout, Calle Cesar Chavez and Yanonali Street, Garden Street and Cota Street, and Yanonali Street and Helena Avenue. Results are expected in late 2024. Funding applications through the California Active Transportation Program (MPO) for Yanonali Street and Anacapa Street, and Yanonali Street and Gray Avenue are also expected in late 2024.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 375,000 2,100,000 0 0 0 500,000 $2,975,000 $2,975,000 Measure C (General Fund) 0 0 41,000 234,000 0 0 0 0 $275,000 $275,000 Total 0 0 416,000 2,334,000 0 0 0 500,000 $3,250,000 $3,250,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Montecito Street Sidewalk
Description:

This project will complete sidewalk infill along the north side of the train station. An enhanced crosswalk will be installed at Montecito Street and Bath Street to encourage pedestrians to use the south side of Montecito Street. The proposed project is adjacent to the City Landmark Moreton Bay Fig Tree and Park which will feature special sidewalks/pathways adjacent to the tree for preservation purposes.

Specific Plans or Policies Relating to this Project:

This project is consistent with the goals of the Pedestrian Master Plan (PMP) to improve the pedestrian system. It is a major objective of the PMP to expand the sidewalk network connections to increase walking for transportation and recreation. The Pedestrian Master Plan identifies the missing sidewalks on Montecito Street which provide connections to West Beach and the Waterfront area.

Santa Barbara Vision Zero Project: In an effort to eliminate all serious and fatal traffic collisions on City streets, this project incorporates the core principles of Vision Zero to increase safety, health, and equitable mobility for all.

Capital Costs:

Status:

The City applied for a Measure A grant in January 2019 for the project. The grant was unsuccessful and the City will continue to pursue grant funding opportunities.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 800,000 $800,000 $800,000
Total 0 0 0 0 0 0 0 800,000 $800,000 $800,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: On-Street Disabled Parking Spaces Description:

The project will add new on-street parking spaces to provide disabled persons with improved access to government buildings. Other locations may be evaluated and included in the future.

Specific Plans or Policies Relating to this Project:

The Americans with Disabilities Act.

Capital Costs:

Status:

City to assess accessibility needs adjacent to government buildings and facilities to identify needs and then fund one to two locations per year.

Infrastructure: General Administration
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 0 0 50,000 50,000 50,000 50,000 50,000 50,000 $300,000 $300,000 Total 0 0 50,000 50,000 50,000 50,000 50,000 50,000 $300,000 $300,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Ortega Pedestrian Overcrossing
Description:

The Ortega Pedestrian Overcrossing stairs will enhance the utility of the existing bridge by providing stairs connecting the bridge to De La Guerra Street on both sides of US 101 and Americans with Disabilities Act (ADA) accessible ramps from the bridge to Canon Perdido Street (north). This will improve the utility of the single bridge by providing three points of entry from either side of Highway 101, which will decrease the crossing time over the highway and reduce the barrier between the Westside neighborhoods and downtown.

Specific Plans or Policies Relating to this Project:

Policy 1.4 of the 2006 Pedestrian Master Plan states: The City shall work to eliminate Highway 101 as a barrier to pedestrian travel. This project is a part of implementing this policy.

Capital Costs:

Status:

When the Ortega Pedestrian Overcrossing was replaced in 2001, the ADA requirements lengthened the distance to walk across the freeway by 500 feet (one city block) on each side. This project reduces the walking distance of a total of 1,000 feet, dramatically improving walking access from the Lower Westside into Downtown.

This project would require grant funding.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 0 0 0 5,000,000 $5,000,000 $5,000,000
Total 0 0 0 0 0 0 0 5,000,000 $5,000,000 $5,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Pedestrian Master Plan Update
Description:

The Pedestrian Master Plan was adopted by City Council in 2006 and has been used as the City's guiding document for documenting existing infrastructure, recommended design guidelines and infrastructure improvements to enhance the City's pedestrian network, and establishing and enhancing safe routes to school. The purpose of the update is to check back in with the community on infrastructure needs and document and prioritize those needs in the updated plan.

Specific Plans or Policies Relating to this Project:

Goal 5 of the Circulation Element of the Santa Barbara General Plan is titled “Increase Walking and Other Paths of Travel.” As a precursor to this Pedestrian Master Plan, it identifies constraints and opportunities to increasing opportunities for pedestrian travel. The adopted Pedestrian Master Plan (2006) provides detailed goals, policies, and strategies to achieve the Circulation Element's goal. The Pedestrian Master Plan Update is also consistent with the City's Vision Zero Strategy as well as SBCAG’s Regional Transportation Plan and Sustainable Communities Strategy.

Capital Costs:

Status:

City staff received a Safe Streets for All Planning grant to prepare a Safe Streets for All Action Plan. The plan will focus on areas in the City along Vision Zero Priority Corridors and Safe Routes to School corridors. It is anticipated that the Pedestrian Master Plan will be amended to include pedestrian related capital projects.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 700,000 0 0 0 $700,000 $700,000
Total 0 0 0 0 700,000 0 0 0 $700,000 $700,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Salsipuedes and Olive Streets (400 blk) Description:

The project involves design and construction of sidewalk along the 400 blocks of Salsipuedes, Quarantina, and Olive Streets.

Crosswalk safety at Olive Street and Haley Street, Olive Street and Cota Street, and Salsipuedes Street and Cota Street will be evaluated. The project may include enhanced crosswalk safety features if justified.

Specific Plans or Policies Relating to this Project:

This project is consistent with the goals of the Pedestrian Master Plan (PMP) to improve the pedestrian system. It is a major objective of the PMP to expand the sidewalk network connections to increase walking for transportation and recreation. Sidewalk Infill along this portion of Salsipuedes Street completes missing links in the sidewalk network providing connections between a variety of residential and commercial uses to the coast, parks, and recreation areas consistent with goals of the PMP.

Capital Costs:

Status:

Grant opportunities will continue to be explored. This is a project that could be competitive for regional Measure A Safe Routes to School or Pedestrian funds and the State/Federal Active Transportation Program.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 75,000 85,000 1,000,000 0 $1,160,000 $1,160,000 Total 0 0 0 0 75,000 85,000 1,000,000 0 $1,160,000 $1,160,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Shoreline Drive at Washington School Description:

The project is to construct a sidewalk and landscape the area adjacent to Washington School, and a short section of missing sidewalk on Shoreline Drive just west of Santa Cruz Boulevard.

The project will also include a crosswalk with enhanced safety features at the Shoreline Drive/Salida Del Sol intersection.

The project may include a widened sidewalk/multiuse path along the south/west sides of Shoreline Drive to provide connectivity between La Mesa Park and the planned multiuse path on Cliff Drive.

Specific Plans or Policies Relating to this Project:

This project is consistent with the goals of the Pedestrian Master Plan (PMP) to improve and enhance the pedestrian system. It is a major objective of the PMP to expand the sidewalk network connections to increase walking for transportation and recreation. Sidewalk Infill along this portion of Shoreline Driveway provides a sidewalk along a school access route (SAR) consistent with the Safe Routes to School program, and if the project includes improvements along the south/west sides of Shoreline Drive, it provides connections between parks and recreation areas, consistent with goals of the PMP.

This sidewalk is a high priority sidewalk based on the Council Adopted Criteria for the Sidewalk Infill Program, but costs prohibit its construction through this program.

Capital Costs:

Status:

This is a high priority sidewalk within the Sidewalk Infill Program but because of the high costs of design and construction, it is being considered as a stand-alone project. This project requires grant funding.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 1,500,000 1,600,000 1,700,000 5,000,000 $9,800,000 $9,800,000 Total 0 0 0 0 1,500,000 1,600,000 1,700,000 5,000,000 $9,800,000 $9,800,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Sidewalk Access Ramps (Annual)
Description:

This annual program is used to accompany the Pavement Maintenance Program. Currently, ADA requires that any access ramp adjacent to a proposed overlay street must be upgraded to meet current standards. The access ramps will be constructed in accordance with the Americans With Disabilities Act (ADA) and per City Standard Details. The ramp style will vary depending on the location of the ramp.

Without access ramps, people with disabilities and families pushing strollers are either forced to walk into the street until there is a curb cut in the sidewalk to walk or ride up onto, or they must navigate the curb, which is not always easy to do and can be impossible depending on the disability level.

Specific Plans or Policies Relating to this Project:

The City of Santa Barbara ADA Transition Plan, Chapter 5 - Public Right-of-Way states that, "Public Works installs curb ramps to provide equal accessibility on public rights-of-way to users of the facilities in compliance with the Codes and Regulations of California Government Code 4450, California Building Code Title-24, and the Americans with Disabilities Act (ADA) of 1990 and the Americans with Disabilities Act Accessibility Guidelines (ADAAG) Title II and Title III updated standards. Also, the City's Pedestrian Master Plan includes guidelines for street corners (Strategy 4.1.3). The guidelines include recommendations for the appropriate style of ramps depending on location. The Public Works Department prioritizes locations based on proximity to medical facilities, schools, transit centers, public facilities, grocery stores, and community input.

Capital Costs:

Status:

There are 710 missing ramp locations remaining in the City. Measure C has allocated approximately $750,000 to address the need for access ramps, primarily as required due to road maintenance.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure A 7,000 0 0 0 0 0 0 0 $0 $7,000
Measure C (General Fund) 718,297 750,000 200,000 250,000 800,000 800,000 800,000 4,000,000 $6,850,000 $8,318,297 Total 725,297 750,000 200,000 250,000 800,000 800,000 800,000 4,000,000 $6,850,000 $8,325,297 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Pedestrian Enhancement: Sidewalk Infill (Annual)
Description:

The project is for sidewalk infill projects that fit within available funding and are likely to be funded through the Sidewalk Infill Program. Larger infill projects are listed separately in this CIP.

Specific Plans or Policies Relating to this Project:

A major objective of the City of Santa Barbara Pedestrian Master Plan (April 2006) is to expand sidewalks and increase walking for transportation and recreation, and to overcome gaps in sidewalks that inhibit walking. In 1998, the City Council adopted the updated Circulation Element of the General Plan that included establishment of an annual sidewalk expansion and improvement program to improve pedestrian access citywide. This Sidewalk Infill Program and the criteria used to establish sidewalk priorities were approved in February 1999, enabling the implementation of as many sidewalk projects each year as possible.

Capital Costs:

Status:

The City’s program includes seven specific criteria for prioritization as identified by the Circulation Element Implementation Committee and adopted by Council: (1) Potential sidewalk location along a school access route (SAR), (2) Location’s current use by pedestrians (that is, a beaten PATH), (3) Potential for sidewalk to lead to parks or recreation areas (PARK), (4) Short gap length of potential sidewalk (GAP), (5) Potential for location to link major destinations or neighborhoods (DEST), (6) Potential for location to increase access to transit (TRAN), and (7) Traffic volume adjacent to the gap (ADT). In FY 2014, the sidewalk inventory and sidewalk infill prioritization was mapped in GIS.

Infrastructure: Bike & Pedestrian
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 0 100,000 0 0 100,000 100,000 100,000 500,000 $800,000 $900,000 Total 0 100,000 0 0 100,000 100,000 100,000 500,000 $800,000 $900,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Streetlights: Citywide Street Light Improvements Maint. & Repair Description:

This is an annual program to fund the replacement of existing streetlights (as needed due to knockdowns) with City standard street light poles and fixtures. This project also funds repair and maintenance, including painting, of existing streetlights.

The project also includes ongoing upgrades to the City's 6.6 amp legacy lighting system. The 6.6 amp system is a high-voltage system, varying from several hundred volts to 20,000 volts. The system requires the assistance of Southern California Edison to disconnect the power in order to test and service the lighting.

The project is also an opportunity to install Light Emitting Diode (LED) street lighting systems that are an energy efficient alternative to the existing high pressure sodium (HPS) lighting provided by the existing

6.6 amp system. LEDs provide uniform light distribution, need less maintenance, and use less energy than HPS systems.

Specific Plans or Policies Relating to this Project:

It is a City goal to replace the outdated 6.6 amp circuits with an energy efficient (240 volt) system that will allow removal of expensive variable voltage transformers with standard electrical supplies. This will allow the city to reduce its cost for electricity, and the repairs to the electrical lighting system will be more typical for the electrician working on the system. Annual ongoing street lighting maintenance and repair.

Capital Costs:

Status:

All 6.6 amp circuits are old, and are in need of replacement. The 6.6 amp circuits are installed with streetlights in series and have a constant current and varying voltage. The technology is outdated from the parallel circuits that are more common in electrical work.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 0 100,000 150,000 250,000 300,000 300,000 300,000 300,000 $1,600,000 $1,700,000 Total 0 100,000 150,000 250,000 300,000 300,000 300,000 300,000 $1,600,000 $1,700,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Traffic Signal Maintenance: Traffic Signal Maintenance Program Description:

This annual program includes the following minor maintenance activities:
1) Traffic signal refurbishments, including reconstructing corroded underground conduit, re-wiring, and replacing poles.
2) Cabinet Replacements - Replace outdated cabinets and electronic components. 3) LED Replacements - Replaces existing LEDs in traffic signals Citywide.

4. Traffic signal pole painting for corrosion protection.

5. Maintenance of the communications system.

Specific Plans or Policies Relating to this Project:

The project will maintain public safety and reduce traffic congestion by performing maintenance to keep traffic signals operating reliably.

Capital Costs:

Status:

The project is funded.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 511,210 350,000 0 150,000 350,000 350,000 350,000 350,000 $1,550,000 $2,411,210 Total 511,210 350,000 0 150,000 350,000 350,000 350,000 350,000 $1,550,000 $2,411,210 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Streets/Transportation
Traffic Signal Upgrades
Description:

This project includes major upgrades to traffic signals including: better indications (vehicular and pedestrian) for safety, detection equipment for safety and efficiency, poles/mast arms, cabinets and wiring, battery back-up systems, communications, surveillance, and software and control upgrades. The project also includes accessibility upgrades at intersection to access ramps and push buttons.

This project will address improvements to increase capacity at intersections, such as turn arrows or phasing changes.

Specific needs identified include:
• Pedestrian countdown timers at Anacapa/De La Guerra, Anacapa/Canon Perdido, Anacapa/Anapamu, La Cumbre Road/La Cumbre Ln.
• Communications upgrades from improved traffic signal timing and synchronization on State Street, Anacapa Street.
• Left turn arrows on La Cumbre Road at La Cumbre Lane
• Bicycle detection at Cliff Drive and Loma Alta, Cliff Drive and Meigs, Cliff Drive and Flora Vista Specific Plans or Policies Relating to this Project:

This project improves the safety and efficiency of traffic signal equipment. Traffic signal improvement efforts are often combined with maintenance efforts to improve long-term reliability.

Capital Costs:

Status:

This project is funded by Measure C. Design of the intersection improvements have been initiated. The most costly features include underground conduit and pedestrian access ramps. This work will be coordinated with nearby street maintenance work to minimize project cost. Implementation is expected over the next several years, depending on street maintenance schedules. The annual need is expected to decrease in about five years, as street maintenance projects on major arterial streets are completed and the system is brought into a state of good repair. Results of funding applications through the Highway Safety Improvement Program are expected in late 2024. The application included improved traffic signal indications and pedestrian countdown timers along Anacapa Street at De La Guerra Street, Canon Perdido Street, and Anapamu Street, and the intersection of La Cumbre Road and La Cumbre Lane. If successful, this local funding will be used for the required local match.

Infrastructure: Roadway Infrastructure
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 250,000 270,000 100,000 150,000 270,000 270,000 270,000 270,000 $1,330,000 $1,850,000 Grant 0 0 560,000 1,600,000 1,600,000 0 0 0 $3,760,000 $3,760,000 Total 250,000 270,000 660,000 1,750,000 1,870,000 270,000 270,000 270,000 $5,090,000 $5,610,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Wastewater
Braemar Lift Station Rehabilitation
Description:

This is the largest wastewater lift station in the City’s collection system with a pumping capacity of 1,000 gallons per minute. The purpose of this project is to make major upgrades to the mechanical and electrical equipment of the lift station and harden the facility against flooding. This lift station last saw major upgrades in 1991 and the aging mechanical and electrical equipment is nearing the end of its useful life.

Specific Plans or Policies Relating to this Project:

The project is confirmed consistent with the City’s Sea Level Rise program through hydrologic modeling of the site. The project will provide continued environmental sustainability and reliability to the Arroyo Burro area. The project will improve energy efficiency for the largest lift station in the collection system through modernization of mechanical and electrical equipment combined with control modifications that meet current best practice.

Capital Costs:

Status:

The project is currently in construction and is anticipated to be completed in 2025.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
SRF Loan 1,616,660 5,000,000 2,734,721 0 0 0 0 0 $2,734,721 $9,351,381 Total 1,616,660 5,000,000 2,734,721 0 0 0 0 0 $2,734,721 $9,351,381 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Wastewater
El Estero Water Resource Center Electrical Distribution Renewal Description:

The purpose of this project is to replace the existing electrical distribution system at El Estero Water Resource Center. The project will replace the nearly 50 year old electrical distribution system, including the main electrical panel and all five substations. It has been sized to meet future electrical demands, maximize use of renewable energy, designed to provide redundancy, and improve overall reliability.

Specific Plans or Policies Relating to this Project:

Replacement of the electrical distribution system was identified as the top priority in the El Estero Facility Master Plan. El Estero operates under a federal National Pollutant Discharge Elimination System Permit. This permit requires regular assessment, refurbishment, and improvement of equipment in order to maintain continued compliance. In addition, El Estero's electrical infrastructure cannot currently support the development of additional potential renewable energy projects. This infrastructure upgrade will allow for the development of solar, battery, and additional cogeneration power plants that would help the City maintain its 100 percent renewable electricity goal.

Capital Costs:

Status:

The project is currently in construction and is expected to be completed in 2028. Staff are processing an amendment to the approved agreement for the State Water Resources Control Board State Revolving Fund (SRF) loan to fund project costs beyond the original agreement amount.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
SRF Loan 3,814,404 16,000,000 16,000,000 14,748,491 0 0 0 0 $30,748,491 $50,562,895 Total 3,814,404 16,000,000 16,000,000 14,748,491 0 0 0 0 $30,748,491 $50,562,895 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Wastewater
El Estero Water Resource Center Maintenance Program
Description:

An annual program of capital maintenance to replace electrical and mechanical equipment in a timely manner to keep the El Estero Water Resource Center operating at a fully functional level. This program includes items such as an ongoing program of equipment rehabilitation or replacement, continued integration of plant processes to the Supervisory Control and Data Acquisition program, ongoing program of pipe replacement throughout the plant, and hardscape improvements.

Upcoming projects include rehabilitation and reconfiguration of the chlorine contact chamber and updates to El Estero's thickening process, such as a new dissolved air flotation thickener/gravity thickener and control building.

Specific Plans or Policies Relating to this Project:

The El Estero Facility Master Plan has identified a series of projects required to maintain treatment plant process facilities, address aging infrastructure needs, improve equipment reliability, and to upgrade the plant to current regulatory and sustainable standards in order to ultimately remain in compliance with the City's Federal National Pollutant Discharge Elimination System Permit.

Capital Costs:

Status:

This program will be ongoing annually to design and construct smaller capital-funded maintenance-related projects at the El Estero Water Resource Center. For example, the Chlorine Contact Chamber Improvements Project is currently in construction and is expected to be completed in 2025.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Wastewater 326,153 3,800,138 200,000 500,000 500,000 3,000,000 500,000 500,000 $5,200,000 $9,326,291 Debt Issuance 0 0 0 0 0 7,000,000 0 14,500,000 $21,500,000 $21,500,000 Total 326,153 3,800,138 200,000 500,000 500,000 10,000,000 500,000 15,000,000 $26,700,000 $30,826,291 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Wastewater
El Estero Water Resource Center Strategic Plan Implementation Description:

A capital program providing planning for the betterment of major equipment and process components used to treat wastewater at the El Estero Water Resource Center. The program is renewed annually to study alternative process options, updates to previous master plan studies, and other studies that support moving forward with the development of a Capital Improvement Project. Prior year projects have included flow monitoring and sampling, Inflow and Infiltration (I&I) studies, and asset management program development.

Specific Plans or Policies Relating to this Project:

El Estero operates under a Federal National Pollutant Discharge Elimination System Permit. This permit requires regular assessment, refurbishment, and improvement of unit process equipment to maintain continued compliance with applicable requirements, and Climate Change Adaptation Planning requirements.

In the next three years our APCD (Air Pollution Control District) permit will need to be revised and a system-wide study will need to be completed to support the new regulations and standards that will be incorporated in the revised permit. A master planning effort to evaluate and plan for future solids handling at the plant will be initiated through this program.

Capital Costs:

Status:

Annual, ongoing program.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Wastewater 63,204 150,000 0 0 0 0 100,000 100,000 $200,000 $413,204 Total 63,204 150,000 0 0 0 0 100,000 100,000 $200,000 $413,204 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Wastewater
Lift Station Maintenance Program
Description:

An annual program of capital maintenance to keep all wastewater lift stations fully operational. Timely replacement of motor control centers, pumps, motors, water level sensors and other electrical and mechanical equipment prevents lift station failures that otherwise could result in wastewater collection system overflows.

Specific Plans or Policies Relating to this Project:

Proper operation and maintenance is a requirement of the City's waste discharge permit.

Work includes rerouting of the Via Lucero Lift Station force main, wet well lining, manhole linings, and concrete repairs for El Camino De La Luz, La Colina, Linda, and Via Lucero lift stations.

Capital Costs:

Status:

This program involves annual construction projects to be located at the City's sewer lift stations. Individual projects' scope of work and cost will vary on an ongoing basis. For example, the Via Lucero Force Main Project is currently in design and construction is expected to begin in 2026.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Wastewater 101,174 500,000 4,750,000 150,000 850,000 200,000 2,000,000 250,000 $8,200,000 $8,801,174 Debt Issuance 0 0 0 0 0 0 2,000,000 4,000,000 $6,000,000 $6,000,000 Total 101,174 500,000 4,750,000 150,000 850,000 200,000 4,000,000 4,250,000 $14,200,000 $14,801,174 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Wastewater
Sanitary Sewer Capacity Improvement Program
Description:

The Sanitary Sewer Capacity Improvement Program is comprised of projects that will help relieve capacity restraints due to increased development and during wet weather events in order to prevent sewage spills. This level of program funding primarily supports the design and construction of projects that reduce constrictions or maintenance within the collection system during wet weather events.

Specific Plans or Policies Relating to this Project:

Spills from the City's wastewater collection system are prohibited by the Clean Water Act and the State Water Resources Control Board Waste Discharge Requirements. In order to respond to the City's Master Development Plan, the City's collection system must be brought up to date to handle the additional flows generated from the further development of the community. The City's Sewer System Management Plan sets forth the manner in which the municipal wastewater collection system will be managed to prevent sanitary sewer overflows and the priorities of each constraint.

In the coming years, the major projects that will be addressed in this program will be revisiting and updating the Inflow & Infiltration Study (in progress), the Calle Real Capacity Improvement Project (in planning), and implementing priority improvements.

Capital Costs:

Status:

Projects associated with this program are actively managed on an ongoing basis.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Wastewater 61,430 250,000 550,000 250,000 250,000 500,000 2,000,000 500,000 $4,050,000 $4,361,430 Debt Issuance 0 0 0 3,750,000 0 0 3,000,000 0 $6,750,000 $6,750,000 Total 61,430 250,000 550,000 4,000,000 250,000 500,000 5,000,000 500,000 $10,800,000 $11,111,430 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Wastewater
Sanitary Sewer Overflow Compliance Program
Description:

The Sanitary Sewer Overflow (SSO) Compliance Program is comprised of projects that will help prevent sewage spills. This level of program funding primarily supports structural rehabilitation of approximately 1% of the public sewage collection system mains and manholes.

Specific Plans or Policies Relating to this Project:

Spills from the City's wastewater collection system are prohibited by the Clean Water Act and the State Water Resources Control Board Waste Discharge Requirements. The City's Sewer System Management Plan sets forth the manner in which the municipal wastewater collection system will be managed to prevent sanitary sewer overflows.

Capital Costs:

Status:

Projects associated with this program are actively managed on an ongoing basis.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Wastewater 2,630,176 4,175,500 1,800,000 1,890,000 1,985,000 2,100,000 2,200,000 2,300,000 $12,275,000 $19,080,676 Debt Issuance 0 0 0 536,350 1,487,000 1,535,000 1,634,000 1,921,400 $7,113,750 $7,113,750 Total 2,630,176 4,175,500 1,800,000 2,426,350 3,472,000 3,635,000 3,834,000 4,221,400 $19,388,750 $26,194,426 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Wastewater
Sea-Level Rise Adaptation Program - Wastewater Infrastructure Description:

This program supports ongoing planning efforts that are needed to adapt the wastewater system to the impacts of sea-level rise. The program will assist with the Wastewater and Water System Sea-Level Rise Adaptation Options feasibility study (see project in Sustainability and Resilience Department) and implement the chosen actions resulting from that study. Relocation and/or flood proofing of the sewer trunk main and associated sewer collection infrastructure currently located south of Cabrillo Boulevard will be the first and highest priority project.

Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan
Capital Costs:

Status:

Sea-Level Rise Adaptation Plan was approved in February 2021. Wastewater system specific adaptation study is fully funded by grants and currently underway.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Wastewater 0 50,000 52,500 55,000 58,000 61,000 64,000 67,000 $357,500 $407,500 Total 0 50,000 52,500 55,000 58,000 61,000 64,000 67,000 $357,500 $407,500 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Cater Reservoir Resiliency Project
Description:

The Cater Water Treatment Plant (Cater) clear well serves as the finished water reservoir for the plant and is a key facility. The Cater Clear Well Reservoir Resiliency Project addresses seismic deficiencies within the reservoir, ensures chlorine contact time for regulatory compliance, and adds storage capacity and redundancy. The existing clear well/reservoir was constructed in 1962, and studies have identified deficiencies and cost-effective solutions to increase the resiliency for this critical facility. The project includes modifications to the interior of the reservoir and increases storage by an additional 2.5 million gallons. Total project costs are currently estimated at $46 million.

Specific Plans or Policies Relating to this Project:

This project was identified in the Water Distribution Infrastructure Plan.

Capital Costs:

Status:

The design phase of the Cater Reservoir Resiliency Project (Project) is nearing completion. Staff are preparing an application for a Drinking Water State Revolving Fund (DWSRF) loan for planning, design, and construction costs.

Note: Design will be cash funded and reimbursed at a later time.

Infrastructure: Water & Wastewater
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
SRF Loan 1,371,445 473,419 22,000,664 22,000,663 0 0 0 0 $44,001,327 $45,846,191 Total 1,371,445 473,419 22,000,664 22,000,663 0 0 0 0 $44,001,327 $45,846,191 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Cater Treatment Plant Maintenance Program
Description:

Program addresses baseline capital improvements such as filter media replacement, equipment upgrades, and process improvements.

Specific Plans or Policies Relating to this Project:

Routine equipment rehabilitation is an important part of asset management at Cater Water Treatment Plant (Cater).

Capital Costs:

Status:

Annual, ongoing program.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 538,203 700,000 405,000 426,000 950,000 2,000,000 2,000,000 525,000 $6,306,000 $7,544,203 Total 538,203 700,000 405,000 426,000 950,000 2,000,000 2,000,000 525,000 $6,306,000 $7,544,203 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Desalination Program
Description:

Program addresses capital improvements for the Desalination Plant and Conveyance System. Projects include expanding the Desalination Plant, upgrading the Desal Pump Station, hardening the Desal pump platform using FEMA grant funds (75%), and constructing the Desal administration building.

Specific Plans or Policies Relating to this Project:

Construction of the desalination conveyance system will improve supply reliability, water quality, and add resiliency. Additionally, the new conveyance system will support the Water Supply Agreement with the Montecito Water District.

Capital Costs:

Status:

Annual, ongoing program.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 4,344,547 3,525,000 1,000,000 1,000,000 1,165,000 975,000 875,000 650,000 $5,665,000 $13,534,547 Grant 778,404 4,208,000 0 0 0 0 0 0 $0 $4,986,404
SRF Loan 0 0 0 0 0 750,000 9,450,000 10,000,000 $20,200,000 $20,200,000 Total 5,122,951 7,733,000 1,000,000 1,000,000 1,165,000 1,725,000 10,325,000 10,650,000 $25,865,000 $38,720,951 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Groundwater Program
Description:

Program addresses capital improvements for the City’s groundwater system, which is an important water supply. Specific projects include well cleaning, pump and motor upgrades, well rehabilitation, and consultation for groundwater program projects and management.

Specific Plans or Policies Relating to this Project:

Groundwater is part of the City's adopted Long-Term Water Supply Plan and Water Supply portfolio. It is an important water source, especially during times of drought when surface water supplies are dwindling.

Capital Costs:

Status:

Annual, ongoing program.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 155,963 460,000 235,000 595,000 255,000 675,000 4,300,000 300,000 $6,360,000 $6,975,963 Total 155,963 460,000 235,000 595,000 255,000 675,000 4,300,000 300,000 $6,360,000 $6,975,963 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Pump Station Program
Description:

Program addresses baseline capital improvements for the City’s Water Distribution Pump Stations. Major work includes replacing large electrical, mechanical, and control components at various pump stations.

For example, the Sheffield Pump Station Upgrades Project is currently in final design and will upgrade the pumps and electrical equipment.

Specific Plans or Policies Relating to this Project:

The City's water pump stations are critical infrastructure that require routine rehabilitation and maintenance.

Capital Costs:

Status:

Annual, ongoing program. The Sheffield Pump Station Upgrades Project is currently in final design.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 164,226 1,150,000 120,000 125,000 130,000 135,000 141,000 148,000 $799,000 $2,113,226 Total 164,226 1,150,000 120,000 125,000 130,000 135,000 141,000 148,000 $799,000 $2,113,226 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Recycled Water Program
Description:

Program addresses capital improvements for the City’s recycled water system, which is an important water supply for the City. Specific projects include upgrades to the Recycled Water Treatment Plant, pump stations, recycled water reservoirs, and distribution system.

Specific Plans or Policies Relating to this Project:

The Recycled Water Program is an important part of the City's adopted Long-Term Water Supply Plan.

Capital Costs:

Status:

Annual, ongoing program.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 569,457 365,000 232,000 245,000 256,000 270,000 290,000 300,000 $1,593,000 $2,527,457 Total 569,457 365,000 232,000 245,000 256,000 270,000 290,000 300,000 $1,593,000 $2,527,457 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Reservoir Program
Description:

Program addresses capital improvements for the Water Distribution potable storage reservoirs and Gibraltar reservoir. Major efforts include consolidating storage in the Water Distribution System and replacing control systems that supply water to and from the reservoirs.

Specific Plans or Policies Relating to this Project:

Maintenance of the City's Distribution Reservoirs is necessary to ensure that the City has safe drinking water supplies in compliance with Federal and State drinking water standards.

Capital Costs:

Status:

Annual, ongoing program to maintain the City's 13 reservoir facilities. For example, a recent asset inventory of the Gibraltar Dam and Reservoir facility identified multiple projects needed in the coming years to maintain this important asset, including potentially significant repairs to the dam's concrete spillways as required by the Division of Safety of Dams, and upgrades to the caretaker's facilities to rehabilitate/replace the house, add a potable water source, and add a reliable power source.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 2,133,896 1,200,000 1,150,000 2,400,000 500,000 520,000 545,000 575,000 $5,690,000 $9,023,896 SRF Loan 0 0 0 0 0 0 0 7,500,000 $7,500,000 $7,500,000
Debt Issuance 0 0 0 0 10,000,000 0 0 0 $10,000,000 $10,000,000 Total 2,133,896 1,200,000 1,150,000 2,400,000 10,500,000 520,000 545,000 8,075,000 $23,190,000 $26,523,896 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Sea-Level Rise Adaptation Program - Water Infrastructure Description:

This program supports ongoing planning efforts that are needed to adapt the water system to the impacts of sea-level rise. The study will identify triggers for action and potential mid- and long-term adaptation options for the water system, including but not limited to the Charles E. Meyer Desalination Plant, Storage Unit 1 groundwater wells, the Ortega Groundwater Treatment Plant, and distribution piping and appurtenances located in low lying areas.

Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan
Capital Costs:

Status:

The Draft Sea-Level Rise Adaptation Plan was adopted by City Council in 2021. The Adaptation Plan acknowledged impacts to water infrastructure and additional study is needed to identify triggers and actions for both mid- and long-term adaptation options. Water system specific adaptation study is fully funded by grants and currently underway.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 0 50,000 52,500 55,000 58,000 61,000 64,000 67,000 $357,500 $407,500 Total 0 50,000 52,500 55,000 58,000 61,000 64,000 67,000 $357,500 $407,500 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Vic Trace Reservoir Replacement and Resiliency Project
Description:

Vic Trace reservoir is the City’s second largest reservoir and serves as a ten million gallon distribution hub for the downtown and West side area. The reservoir was originally constructed in 1952. Through condition assessment, careful study, and analysis, the reservoir has been prioritized for replacement. The reservoir's elevation, size, and location make it a key asset for the City.

Specific Plans or Policies Relating to this Project:

This project was identified in the Water Distribution Infrastructure Plan.

Capital Costs:

Status:

The project is currently in preliminary design and will continue into environmental review this fiscal year. Staff will prepare an application for Council approval for a Drinking Water State Revolving Fund (DWSRF) loan for planning, design, and construction costs.

Note: Design will be cash funded and reimbursed at a later time.

Infrastructure: Water & Wastewater
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
SRF Loan 413,939 2,000,000 5,000,000 5,086,061 37,500,000 0 0 0 $47,586,061 $50,000,000 Debt Issuance 0 0 0 0 0 37,500,000 37,500,000 0 $75,000,000 $75,000,000 Total 413,939 2,000,000 5,000,000 5,086,061 37,500,000 37,500,000 37,500,000 0 $122,586,061 $125,000,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Water Main Replacement Program
Description:

Program addresses capital improvements for the City’s approximately 307 miles of water mains and related appurtenances, such as valves, fire hydrants, and pressure reducing stations. City Council has set a goal of annually replacing approximately 2%, or 6 miles, of the City’s water mains.

Specific Plans or Policies Relating to this Project:

Council's goal is to annually replace 2% of the distribution system infrastructure.

Capital Costs:

Status:

Annual, ongoing program to replace aging water mains.

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 10,656,847 16,450,000 17,350,000 16,850,000 17,675,000 18,550,000 19,800,000 20,500,000 $110,725,000 $137,831,847 Total 10,656,847 16,450,000 17,350,000 16,850,000 17,675,000 18,550,000 19,800,000 20,500,000 $110,725,000 $137,831,847 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Public Works Water
Water Meter Program
Description:

Program addresses improvements for the City’s water metering system. Baseline capital work includes ongoing replacement of the City's water meters and associated improvements, including replacing meter boxes and related infrastructure as needed.

Specific Plans or Policies Relating to this Project:

Accurate measurement of customer water use is the foundation for sustaining a trust and high regard of our customers and a best management practice for operation of a water system. Ongoing maintenance and replacement of water meters will ensure water measurement accuracy, which will provide customers with an accurate accounting and billing of water use and will enable the City to accurately account for water sales.

Capital Costs:

Infrastructure: Water & Wastewater
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Water 1,027,550 171,000 178,000 116,000 122,500 130,000 135,000 145,000 $826,500 $2,025,050 Grant 1,500,000 0 0 0 0 0 0 0 $0 $1,500,000
Total 2,527,550 171,000 178,000 116,000 122,500 130,000 135,000 145,000 $826,500 $3,525,050 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
30-Year Waterfront Adaptation Plan
Description:

A 30‐Year Waterfront Adaptation Plan that will be a shoreline masterplan for the public Waterfront and Harbor area. The plan will include): 1) an analysis of adaptation options along the Waterfront to retain as much beach as possible while maintaining recreation uses; 2) an analysis of options to raise and otherwise modify the Harbor breakwater, groins, and walkway to reduce flooding and storm damage and prepare for sea-level rise; and 3) an analysis of detailed triggers or thresholds for future adaptation actions at the waterfront. The plan will also incorporate the chosen infrastructure relocation and flood proofing alternatives from the Wastewater and Water Systems Vulnerability and Adaptation Options Report
Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan; Hazard Mitigation Plan; Seismic and Safety Element Capital Costs:

Status:

Grant funded. Project launched.

Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 1,940,000 0 0 0 0 0 0 $0
Total 1,940,000 0 0 0 0 0 0 $0
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Airport Master Solar Project
Description:

Solar photovoltaic and possible battery installations at multiple buildings and facilities at the Airport and in coordination with the Santa Barbara Clean Energy program. Project may be funded entirely from City (Energy Management or Airport) or as a power purchase agreement.

Specific Plans or Policies Relating to this Project:

Strategic Energy Plan (SEP,) 2035 Carbon Neutrality Goal, Climate Action Plan Capital Costs:

Status:

Project scoping has commenced.

Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Energy Management 0 0 0 0 0 0 0 0 $0 $0
Total 0 0 0 0 0 0 0 0 $0 $0
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Amtrak EV Charger Installation
Description:

City contractor to install two duel-port Direct Curent Fast Chargers (300kW each) in the Northern parking lot closest to Montecito St. Contractor to cover upfront Capital Costs and apply grant funding to costs.

Contractor will operate and maintain chargers for public use (fee based). SCE provide new electrical service (1200 kW) and new transfromer. $220 K in CALeVIP 2.0 funding secured. Project includes bollards and restriping, new signage, power modules, switchgear & meter, charger units, trenching, minor landscaping, and relocation of parking lot light pole. SCE work in the ROW to pull from existing SCE vault in street to transformer and Charging equipment and one charger to be located in the ROW. Includes infrastructure for possible expansion of chargers in near future.

Capital Costs:

Status:

In Permitting
Infrastructure: Sustainability & Resilience
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 220,000 0 0 0 0 0 $220,000 $220,000
Total 0 0 220,000 0 0 0 0 0 $220,000 $220,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Andrée Clark Bird Refuge Water Quality and Habitat Restoration Description:

The Andrée Clark Bird Refuge is a 29-acre lake located at the east end of Santa Barbara. The lake is an historic salt marsh that was dredged in the late 1920's to provide a year-round water feature and improve habitat for open water bird species. Poor water quality conditions and strong odors at the lake have been problematic since the early 1930's. The goals of this project are to improve water quality, wildlife habitat (aquatic and avian), aesthetics, and reduce odors while maintaining current flood protection.

Specific Plans or Policies Relating to this Project:

The project is consistent with the Creek Inventory & Assessment Study (2000) and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, …to improve the quality of onshore or offshore waters."
Capital Costs:

Status:

Project implementation of Phase 1 is complete. Ongoing maintenance and monitoring continues for permit compliance and to inform future habitat and public access improvements (Phase 2)
Infrastructure: Creeks
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 721,717 0 0 600,000 0 0 0 $600,000 $1,321,717 Total 0 721,717 0 0 600,000 0 0 0 $600,000 $1,321,717
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Arroyo Burro Restoration at Palermo Drive
Description:

The purpose of this project is to implement a restoration project on the Arroyo Burro riparian corridor at the terminus of Palermo Drive. This reach of Arroyo Burro experiences bank erosion and extensive areas of non-native vegetation.

Specific Plans or Policies Relating to this Project:

Identified in the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

Funds will be utilized for planning, design, environmental review, and permitting. Implementation of the restoration project is planned to occur in FY 2027-2028.

Infrastructure: Creeks
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 1,578,673 0 0 1,000,000 0 0 0 $1,000,000 $2,578,673 Grant 0 0 0 0 500,000 0 0 0 $500,000 $500,000
Total 0 1,578,673 0 0 1,500,000 0 0 0 $1,500,000 $3,078,673 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Bacterial Reduction Program/Water Quality Capital
Description:

The purpose of this project is to design and install targeted water quality treatment projects (such as dry weather diversions, drywells, vegetated swales, curb-cuts, infiltration chambers, and active treatment) to reduce the discharge of polluted water to creeks and beaches in Santa Barbara. Funding for the 5-year capital program will allow for the development of three to four new projects (design, permitting, and construction).

Specific Plans or Policies Relating to this Project:

Consistent with the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

Parkway retrofit demo project underway
Infrastructure: Creeks
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 444,311 50,000 50,000 100,000 100,000 150,000 0 $450,000 $894,311 Total 0 444,311 50,000 50,000 100,000 100,000 150,000 0 $450,000 $894,311 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Cater Clear Well Solar and Battery Storage Project
Description:

Up to 750 kW of solar atop the to be constructed Clear Well Reservoir at Cater Water Treatment Facility and up to 3,000 kWh of battery energy storage system (BESS) on site. Project may be financed with a low-interestet Clean Water State Revolving Fund (CWSRF) loan the the Water Division has secured for the reservoir project.

Specific Plans or Policies Relating to this Project:

Green Building Policy, Climate Action Plan, and 2035 Carbon Neutrality Goal Capital Costs:

Status:

Carollo Engineers has completed a basic, preliminary analysis of solar and BESS options at the site with a broad range of both PV and BESS sizing scenarios.

Upfront capital costs range from $2.4M - $4.4M based on system size.

Infrastructure: Water & Wastewater
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Enterprise Fund 0 0 3,200,000 2,500 2,500 2,500 2,500 50,000 $3,260,000 $3,260,000 Total 0 0 3,200,000 2,500 2,500 2,500 2,500 50,000 $3,260,000 $3,260,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Corporate Yard Fleet EV Charger Project
Description:
2024/25 muni EV charger expansion includes 4x DC Fast chargers and 45+ Level-2 chargers at 8-10 locations throughout the yard, designed to be able to expand later. Will require new 480v transformer, step-down transformer, switchgear. Using Charge Ready Transport program through SCE to pary for electrical service upgrades to site and partially APCD and EECBG grant funded Specific Plans or Policies Relating to this Project:

Advanced Clean Fleets Regulation (State Policy), Climate Action Plan Capital Costs:

Status:

Basic system concept completed and submitted to SCE's Charger Ready Progam for their design process. $156 K in APCD Funding Secured. $144K in EECBG funding secured. Charge Ready program covers service upgrades to site and 80% of trenching and conduit runs to charger stub outs. City will be responsible for costs of chargers, power modules and remaining 20%
Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 156,000 0 0 0 0 $156,000 $156,000
Grant 0 0 0 144,330 0 0 0 0 $144,330 $144,330
Energy Management 0 0 0 1,054,169 5,000 5,000 5,000 50,000 $1,119,169 $1,119,169 Total 0 0 0 1,354,499 5,000 5,000 5,000 50,000 $1,419,499 $1,419,499 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Demonstration Kitchen at City Facility
Description:

This project will take an existing City owned operating commercial kitchen and convert it into an allelectric one. This will serve as a model for the community to the benefits and functionality of new technology allowing for all-electric kitchen equipment, and support the transition off of fossil fuels to help reach carbon neutrality. A kitchen will be selected in coordination with Parks and Recreation department that needs upgrades already and meets program requirements.

Specific Plans or Policies Relating to this Project:

Green Building Policy, Climate Action Plan, and 2035 Carbon Neutrality Goal Capital Costs:

Status:

The project has yet to commence pending coordination with Parks and Recreation to identify a suitable location, find staff time to help scope, plan and permit the project, and procure funds for implementation.

Infrastructure: Sustainability & Resilience
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Energy Management 0 0 0 0 0 0 0 0 $0 $0
0 0 0 0 0 0 0 0 $0 $0
Total 0 0 0 0 0 0 0 0 $0 $0
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Eastside Library EV Charger Project
Description:

Project to be completed with contractor who will install, operate and maintain chargers. Chargers will be installed at contractor's expense. City has secured $220K in State Incentives (CaleVIP) and $400 K in additional State Incentives through SBCAG (SB1). City contractor to install two duel-port Direct Curent Fast Chargers(300kW each) in the E. Library parking lot closest to south entrance. Project includes bollards and restriping, new signage, power modules, switchgear & meter, charger units, trenching, minor landscaping. SCE work includes new pole in ROW, new drop, new transformer in landscaped peninsula near South entrance. No equipment to be located in the ROW.

Specific Plans or Policies Relating to this Project:

Climate Action Plan
Capital Costs:

Status:

Site plan submitted to B&S for review.

Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 400,000 0 0 0 0 0 $400,000 $400,000
Grant 0 0 220,000 0 0 0 0 0 $220,000 $220,000
Total 0 0 620,000 0 0 0 0 0 $620,000 $620,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Fleet Generator / BESS to EV Chargers Interconnection Project Description:

This project will involve planning, permitting and construction to connect an existing generator at the corporate yard to several fleet electric vehicle (EV) chargers, including new DCFC fast chargers. Another project option is adding a Battery Energy Storage System to connect with the chargers. This will add resiliency to be able to charge the growing number of electric vehicles in the City's fleet during power outages and allow emergency functioning vehicles to be procured as all electric by having a reliable source of charging during power outages.

Specific Plans or Policies Relating to this Project:

Climate Action Plan, 2035 Carbon Neutrality Goal
Capital Costs:

Status:

The project has yet to commence due to lack of scoping and funding. Planning can commence once final plans are in place to add four DCFC fast EV chargers at the corporate yard which is expected to be permitted by Q4 FY25 and construction to be complete in FY 26 Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Energy Management 0 0 0 0 0 0 0 0 $0 $0
Total 0 0 0 0 0 0 0 0 $0 $0
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Floodplain and Creeks Ordinance and Incentives
Description:

Study and implement changes to the City’s floodplain ordinance in flooding areas impacted by sea-level rise and changes in rainfall from climate change. Study incentives for floodproofing and raising existing structures in areas at risk of increased flooding (e.g. potential permit streamlining or relief from design, zoning, or height requirements). Institute creek setback ordinance. The ordinances will be developed based on information from the Stormwater Modeling and Adaptation project.

Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan, Hazard Mitigation Plan, Seismic and Safety Element Capital Costs:

Status:

Unfunded, not started. Will seek grant funding. Will implement after Watershed Modelling project.

Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 0 0 200,000 0 0 0 $200,000 $200,000
Total 0 0 0 0 200,000 0 0 0 $200,000 $200,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Las Positas Creek Restoration
Description:

The purpose of this project is to design and implement a creek restoration project in the Las Positas Valley.

Specific Plans or Policies Relating to this Project:

Consistent with the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005) and Municipal Code section 4.09.020, requiring Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and... to improve the quality of onshore or offshore waters."
Capital Costs:

Status:

Existing funds will be sufficient to complete the outreach, planning, design, technical studies, environmental review, permitting, and construction of this restoration project.

Infrastructure: Creeks
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 881,659 0 0 0 0 0 0 $0 $881,659
Total 0 881,659 0 0 0 0 0 0 $0 $881,659
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Lighthouse Watershed Restoration
Description:

The purpose of this project is to restore a section of Lighthouse Creek. Restoration could include nonnative weed removal and re-vegetation with native plants, biotechnical stabilization of eroding banks, removal of hard structures from the creek channel, and improvement of trails and interpretive information.

Specific Plans or Policies Relating to this Project:

Identified in the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

This is a conceptual project intended to restore the riparian corridor in La Mesa Park.

Infrastructure: Creeks
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 0 0 0 0 150,000 500,000 0 $650,000 $650,000 Grant 0 0 0 0 0 100,000 0 0 $100,000 $100,000
Total 0 0 0 0 0 250,000 500,000 0 $750,000 $750,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Lower Arroyo Burro Restoration
Description:

The purpose of this project is to restore a section of lower Arroyo Burro. Restoration could include nonnative weed removal and re-vegetation with native plants, biotechnical stabilization of eroding banks, removal of hard structures from the creek channel, and improvement of trails and interpretive information.

Specific Plans or Policies Relating to this Project:

Identified in the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

This is a conceptual project intended to restore the riparian corridor in the lower Arroyo Burro watershed.

Infrastructure: Creeks
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 400,000 0 0 0 400,000 1,000,000 0 $1,400,000 $1,800,000 Grant 0 0 0 0 0 400,000 0 0 $400,000 $400,000
Total 0 400,000 0 0 0 800,000 1,000,000 0 $1,800,000 $2,200,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Lower Sycamore Creek and Estuary Restoration Project
Description:

This project consists of the comprehensive widening and restoration of Sycamore Creek and associated estuary spanning south from Highway 101 to the ocean to expand and improve habitat, raise flood capacities, and increase resilience from sea-level rise and other climate changes.

The planning phase of this project will provide analysis of alternatives to: widen the creek channel; lay back the banks of the creeks; restore the channel, banks, and estuary with native wetland and riparian vegetation; widen the span and capacity of four bridges in area; and complete needed right-of-way and parking modifications to Ninos Drive and Park Way to facilitate expansions of habitat area. Technical reports and feasibility analysis will be prepared that will include hydrologic, sediment, and wave uprush modeling factoring in sea-level rise; biological analysis with an emphasis on increasing habitat quantity and quality for endangered tidewater goby and steelhead, as well as other estuarine, riverine, and riparian species and minimizing habitat disruption during construction; traffic, pedestrian, and parking analysis for Ninos Drive and Park Way; and cost estimates, among other factors. Following preparation of technical reports and feasibility analysis, conceptual level plans (30% design) will be produced and environmental review pursuant to the California Environmental Quality Act will be conducted (anticipated level of review a mitigated negative declaration). A robust public outreach process will occur as the draft feasibility analysis and plan is created and as part of CEQA environmental review. Environmental permitting will be conducted followed by completion of 100% final design drawings. The second phase of the project will include construction.

Capital Costs:

Status:

The project will be managed out of the City’s Sustainability and Resilience Department by the Creeks Division with support from the Public Works Engineering Division and Energy and Climate Division. City of Santa Barbara Measure B creeks restoration and water quality funds are available to partially assist with staffing and implementation of the project. However, the City is seeking grant funds for the majority of the project Infrastructure: Creeks
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 2,000,000 0 0 0 0 0 $2,000,000 $2,000,000
Measure B 0 864,279 550,000 0 0 0 3,000,000 0 $3,550,000 $4,414,279 Total 0 864,279 2,550,000 0 0 0 3,000,000 0 $5,550,000 $6,414,279 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Mid-Arroyo Burro Restoration
Description:

The purpose of this project is to restore specified reaches of the riparian corridor in the mid-Arroyo Burro watershed (between Highway 101 and Foothill Road). Restoration could include property acquisition, removal of hard structures from the creek channel, non-native weed removal and re-vegetation with native plants, biotechnical stabilization of creek banks, and improvement of trails and interpretive information.

Specific Plans or Policies Relating to this Project:

Identified in the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

Existing and future funds will be sufficient to complete the outreach, planning, design, technical studies, environmental review, permitting, and construction of this restoration project.

Infrastructure: Creeks
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 451,131 0 0 1,500,000 0 0 0 $1,500,000 $1,951,131 Total 0 451,131 0 0 1,500,000 0 0 0 $1,500,000 $1,951,131 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Mission Creek Restoration at De La Vina Street
Description:

The purpose of this project is to restore the riparian corridor in Mission Creek. Restoration will include native planting on a 0.37 acres of a parcel adjacent to Mission Creek and the proposed new De La Vina Street Bridge.

Specific Plans or Policies Relating to this Project:

Consistent with the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

This project will restore the riparian habitat adjacent to Mission Creek. Existing funds are suficeint for propsed work which will begin in FY 26 Infrastructure: Creeks
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 2,188,605 0 0 0 0 0 0 $0 $2,188,605
Total 0 2,188,605 0 0 0 0 0 0 $0 $2,188,605
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Mission Creek Restoration at Oak Park
Description:

The purpose of this project is to restore Mission Creek in Oak Park. Restoration could include non-native weed removal and re-vegetation with native plants, removal of steelhead passage barriers, biotechnical stabilization of eroding banks, removal of concrete from the creek channel, and improvement of trails and interpretive information.

Specific Plans or Policies Relating to this Project:

Identified in the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

This project will be complete and closed out in FY 26
Infrastructure: Creeks
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 1,082,332 0 0 0 0 0 0 $0 $1,082,332
Total 0 1,082,332 0 0 0 0 0 0 $0 $1,082,332
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Municipal EV Charging Infrastructure
Description:

This effort involves planning, permitting and installation of electric vehicle (EV) charging infrastructure at City facilities to support fleet electrification. Each year specific facilities will identified for EV charger infrastructure installations based on anticipated needs from planned vehicle replacement schedules.

Specific Plans or Policies Relating to this Project:

Climate Action Plan and 2035 Carbon Neutrality Goal
Capital Costs:

Status:

Ongoing. The city currently has 24 networked EV chargers and 8 un-networked chargers to support the City's electric and hybrid fleet of vehicles. Advanced Clean Fleets (ACF) compliance will requires that City fleets transition to electic vehicles requiring and ongoing expansion of charging infrastructure.

Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure C (General Fund) 0 0 150,000 150,000 150,000 150,000 150,000 150,000 $900,000 $900,000 Total 0 0 150,000 150,000 150,000 150,000 150,000 150,000 $900,000 $900,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Municipal Facilities Electrification Make-Ready Assessment Description:

Project will provide detailed assessments of existing conditions and necessary infrastructure required for electrification of all fossil fuel burning equipment in City owned facilities. This project would be scoped and sent out to bid and would involve close coordination with Facilities Division along with all departments and divisions who operate facilities with water heating, & space heating & cooling and cooking.

Specific Plans or Policies Relating to this Project:

Green Building Policy, Climate Action Plan, and 2035 Carbon Neutrality Goal Capital Costs:

Status:

Unfunded. Not started.

Infrastructure: Sustainability & Resilience
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Energy Management 0 0 0 0 0 0 0 0 $0 $0
Total 0 0 0 0 0 0 0 0 $0 $0
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Municipal Facilities Electrification Make-Ready Implementation Description:

Project would take recommendation from the previously completed Make-Ready Assessment to develop a scope of work to bid out specific City Facilities Division for design, permitting and installation of makeready infrastructure to accommodate future end-use electronification efforts. This would include elements such as, electrical service size upgrades, transformers, panel replacements, conduit and outlets. Facilities with more substantial make-ready needs and those with older systems slated for replacement in the near future would be prioritized each year.

Specific Plans or Policies Relating to this Project:

Green Building Policy, Climate Action Plan, and 2035 Carbon Neutrality Goal Capital Costs:

Status:

Unfunded. Not started
Infrastructure: Sustainability & Resilience
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Energy Management 0 0 250,000 250,000 250,000 250,000 250,000 0 $1,250,000 $1,250,000 Total 0 0 250,000 250,000 250,000 250,000 250,000 0 $1,250,000 $1,250,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Old Mission Creek at West Figueroa
Description:

This project has two primary objectives: 1) to develop a storm water detention system to reduce bacteria, sediment, and other pollutants in storm water in Old Mission Creek, and 2) to restore and enhance the riparian habitat adjacent to the creek.

Specific Plans or Policies Relating to this Project:

Consistent with the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

Next steps include negotiating landowners easements, completing preliminary plans, environmental review and permitting, final design, and seeking grant funds for project construction. Construction is anticipated for FY 2028. Measure B funds will be used for the steps outlined above and may be used to match grants for construction.

Infrastructure: Creeks
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 550,000 0 0 0 1,000,000 0 0 $1,000,000 $1,550,000 Total 0 550,000 0 0 0 1,000,000 0 0 $1,000,000 $1,550,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Police Station Solar PV and BESS
Description:

Installation of two rooftop structural steel canopy support and PV array (560 kW) and new Battery Energy Storage System(BESS) (location TBD), interconnected to two building meters to provide operational electrical power and emergency back-up power in case of outage and to operate building as net-zeroenergy. Project will be financed through a Power Purchase Agreement with no up-front capital costs.

Capital Costs:

Status:

Power Purchase Agreement To be put to Bid in November 2024 Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Energy Management 0 0 0 0 0 0 0 0 $0 $0
Total 0 0 0 0 0 0 0 0 $0 $0
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Rattlesnake Creek Restoration Program
Description:

The purpose of this project is to restore a section of Rattlesnake Creek. Restoration would include nonnative weed removal and re-vegetation with native plants, removal of steelhead passage barriers, and biotechnical stabilization of eroding banks.

Specific Plans or Policies Relating to this Project:

Consistent with the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

This is project is intended to restore the riparian corridor and remove a fish passage barrier in the Rattlesnake Creek watershed.

Infrastructure: Creeks
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 400,000 0 1,250,000 0 0 0 0 $1,250,000 $1,650,000 Grant 0 0 0 500,000 0 0 0 0 $500,000 $500,000
Total 0 400,000 0 1,750,000 0 0 0 0 $1,750,000 $2,150,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Resilience Hub Campus Project
Description:

Development of resilience hub at joint campuses of Eastside Library and Franklin Center. Project to start with assessment of needs and then implementation. Will include installation of microgrid and other measures. Site identifed as priority project area due to community need.

Capital Costs:

Status:

Energy Assurance Report and Audit for the Facility was completed in 2022. Report identifed recommened HVAC, water heating, lighting upgrades as well as 186 kWh Battery to be coupled with 131 kW solar array. City unsuccessfully applied for grant funding for Solar and BESS in 2023. Will continue to seek grant funding opportunities.

Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Energy Management 0 0 0 500,000 500,000 0 0 0 $1,000,000 $1,000,000 Total 0 0 0 500,000 500,000 0 0 0 $1,000,000 $1,000,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
San Roque Creek Restoration
Description:

The purpose of this project is to restore a section of San Roque Creek. Restoration would include nonnative weed removal and re-vegetation with native plants, biotechnical stabilization of eroding banks, and improvement of trails and interpretive information.

Specific Plans or Policies Relating to this Project:

Consistent with the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

This is a creek restoration project intended to restore the riparian corridor in the upper San Roque Creek watershed.

Infrastructure: Creeks
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 150,000 1,000,000 0 0 0 0 0 $1,000,000 $1,150,000 Grant 0 0 500,000 0 0 0 0 0 $500,000 $500,000
Total 0 150,000 1,500,000 0 0 0 0 0 $1,500,000 $1,650,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Shoreline Monitoring Program
Description:

The Sea-Level Rise Adaptation Plan includes a near-term action to develop and implement a Regional Shoreline Monitoring Program in coordination with other regional, state, and federal agencies that includes monitoring of sea-level-rise-related hazards, identification of action thresholds, and regular reassessment of the need for implementation actions. Project includes 2 years of pilot monitoring.

Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan
Capital Costs:

Status:

Grant funded. Project launched jointly by City and BEACON.

Infrastructure: Sustainability & Resilience
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 630,000 0 0 0 0 0 0 $0 $630,000
Total 0 630,000 0 0 0 0 0 0 $0 $630,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Storm Water Treatment Retrofit Projects (LID)
Description:

The purpose of this project is to design and construct "Low Impact Development" (storm water and urban runoff treatment) demonstration projects on City-owned properties including buildings, parks, and rightsof-way, to improve creek and ocean water quality.

Specific Plans or Policies Relating to this Project:

Consistent with the Creeks Program Funding Guidelines (2009) and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters."
Capital Costs:

Status:

Future Storm Water Treatment Retrofit Projects will be identified, designed, and implemented in FY 2025-2029. Alternatives currently being explored on State Street.

Infrastructure: Creeks
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 1,177,763 150,000 150,000 150,000 150,000 150,000 150,000 $900,000 $2,077,763 Total 0 1,177,763 150,000 150,000 150,000 150,000 150,000 150,000 $900,000 $2,077,763 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Stormwater Modeling and Adaptation
Description:

Study of increased flood levels from changes in rainfall from climate change interacting with sea-level rise. Hydraulic modelling of stormwater system. Study of vulnerabilities and adaptation options for the stormwater system.

Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan; Hazard Mitigation Plan; Seismic and Safety Element Capital Costs:

Status:

Funded for portion of system.

Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 950,000 0 0 0 0 0 0 $0 $950,000
Total 0 950,000 0 0 0 0 0 0 $0 $950,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Upper Mission Creek Restoration
Description:

The purpose of this project is to develop a restoration project for upper Mission Creek. Restoration would include non-native weed removal and re-vegetation with native plants, biotechnical stabilization of eroding banks, removal of fish passage barriers and hard structures from the creek area, and improvement of interpretive information.

Specific Plans or Policies Relating to this Project:

Identified in the Creek Inventory & Assessment Study (2000), Creeks Program Funding Guidelines (2009), and Existing Conditions Study of the Arroyo Burro, Mission, Sycamore, and Laguna Creek Watersheds (2005). Consistent with Municipal Code section 4.09.020, which requires that Measure B 2000 revenues be used "to fund programs to improve the quality of storm waters and other surface waters discharged into the Pacific Ocean, to carry out creek restoration improvements, and for projects or programs to improve the quality of onshore or offshore waters." Capital Costs:

Status:

This is a creek restoration project intended to restore the riparian corridor and remove fish passage barriers in the upper Mission Creek watershed.

Infrastructure: Creeks
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Measure B 0 550,000 250,000 0 2,000,000 0 0 0 $2,250,000 $2,800,000 Grant 0 0 0 500,000 500,000 0 0 0 $1,000,000 $1,000,000 Total 0 550,000 250,000 500,000 2,500,000 0 0 0 $3,250,000 $3,800,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Wastewater and Water Systems Sea-Level Rise Adaptation Report Description:

A comprehensive study of adaptation options for threatened portions of the wastewater and water systems, including relocation and redesign of portions of the systems, long-term adaptation options for El Estero Water Resource Center, and possible service point improvements. The analysis will study the feasibility and alternatives for relocating and flood proofing an existing sewer trunk main and other colocated infrastructure that is located south of Cabrillo Boulevard such as water mains and natural gas pipelines. A detailed evaluation of alternatives, feasibility, and order of magnitude cost estimates for all options to address impacted water and wastewater infrastructure south of Cabrillo Boulevard will be provided. Additionally, the report will consider triggers for decision making on future adaptation options for the systems.

Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan; Compliance with Waste Discharge Requirements for El Estero Water Resource Center Capital Costs:

Status:

Grant funded. Project launched.

Infrastructure: Sustainability & Resilience
Include in the HMP: Yes
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 1,030,000 0 0 0 0 0 0 $0 $1,030,000
Total 0 1,030,000 0 0 0 0 0 0 $0 $1,030,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Waterfront Harbor Parking Lot EV Chargers
Description:

City contractor to install two duel-port Direct Curent Fast Chargers (300kW each) and three duel port 180 kW chargers (10 spaces/ports total) in the main harbor parking lot closest to Marina 3. Contractor to cover upfront Capital Costs and apply grant funding to costs. Contractor will operate and maintain chargers for public use (fee based). $1.295 M in State incentives secured. Project includes bollards and restriping, new signage, power modules, switchgear & meter, charger units, trenching, minor landscaping. SCE to provide new electrical service (1200 kW), new transfromer, and SCE work in the ROW to pull from existing SCE vault in at street edge at NW corner of lot to transformer in or under grassy knoll via Cabrillo blvd (ROW)or creating new vault closer to transformer location. no equipment to be located in the ROW. Includes infrastructure for possible expansion of chargers in near future.

Specific Plans or Policies Relating to this Project:

Climate Action Plan. Carbon Neutrality Goal by 2035
Capital Costs:

Status:

Pending SCE Grid improvements
Infrastructure: Sustainability & Resilience
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Grant 0 0 1,295,000 0 0 0 0 0 $1,295,000 $1,295,000
Total 0 0 1,295,000 0 0 0 0 0 $1,295,000 $1,295,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Sustainability & Resilience
Waterfront Solar Project
Description:

Solar photovoltaic rooftop installations at several buildings in the Harbor Commercial Area. Project will be funded through a power purchase agreement with no upfront capital costs Specific Plans or Policies Relating to this Project:

Strategic Energy Plan, 2035 Carbon Neutrality Goal
Capital Costs:

Status:

Project scoping has commenced. Project received Net Energy Metering 2.0 status from edison in late 2023. Project to coordinate with re-roofing project for at least one site. Expected project completion in 2025. Coordinating with Waterfront's engineering staff.

Infrastructure: Sustainability & Resilience
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Energy Management 0 0 0 0 0 0 0 0 $0 $0
Total 0 0 0 0 0 0 0 0 $0 $0
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Biking Facilities- Leadbetter Beachway Connectivity
Description:

The Waterfront is a popular attraction for both visitors and locals. As such, the Department continuously looks for ways to address issues or make improvements on existing infrastructure to support that. The current phase will be to address bike and pedestrian traffic in the Harbor West Parking Lot adjacent to the central Leadbetter Beach area.

Specific Plans or Policies Relating to this Project:
30 Year Sea Level Rise Adaptation Plan
City of Santa Barbara ADA Transition Plan by Gilda Puente Peters Architects, 2018.

State Tidelands Trust - Section 1.a (5) "That the lands shall be used by the city …for construction, reconstruction, repair and maintenance and operation of public buildings …".

Capital Costs:

Status:

Planning and evaluation is in progress. The 30-Year Sea Level Rise Adaptation plan is underway and will be developing 30% design plans for this project. The Adaptation plan is being fully funded with grant funds.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront Capital Reserve 0 30,000 0 0 1,500,000 0 0 2,000,000 $3,500,000 $3,530,000 Waterfront 0 0 0 0 0 0 0 0 $0 $0
Total 0 30,000 0 0 1,500,000 0 0 2,000,000 $3,500,000 $3,530,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Breakwater Repairs & Upgrades
Description:

The Breakwater was built in the 1930's and needs maintenance and repair on an ongoing basis. This barrier protects the four marinas within the Santa Barbara harbor from the open ocean.

Specific Plans or Policies Relating to this Project:
30 Year Sea Level Rise Adaptation Plan
State Tidelands Trust - Section 1.a (1) "That the lands shall be used by the city … for the improvement … of harbors and for construction, reconstruction, repair, maintenance, and operation of wharves, docks, piers, slips …".

Harbor Master Plan (1996) - Policy DEP 3 " … a priority is to provide … service to boating public …".

Capital Costs:

Status:

Planning. The status of the breakwater is being reviewed as part of the 30 Year Sea Level Rise Adaptation Plan. Recommenations for future improvements will be taken from this plan.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 0 0 0 250,000 0 2,000,000 $2,250,000 $2,250,000 Total 0 0 0 0 0 250,000 0 2,000,000 $2,250,000 $2,250,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Commercial Area Improvements
Description:

The Waterfront is landlord to sixty plus tenants and works as a partner with them. To this end, staff work to ensure that our commercial areas are both safe and appealing to the public. This requires investment in commercial areas to meet these goals. Waterfront staff work with tenants and the public to address concerns, and to bring forward improvements that benefit users and the public.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (1) "That the lands shall be used by the city … for the improvement … of harbors and for construction, reconstruction, repair, maintenance, and operation of wharves, docks, piers, slips …".

Capital Costs:

Status:

Planning
Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 550,000 0 0 0 0 500,000 $1,050,000 $1,050,000 Total 0 0 550,000 0 0 0 0 500,000 $1,050,000 $1,050,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Harbor Patrol Boat Hull Rehab
Description:

Maintain the structual integrity of the Harbor Patrol Vessels to extend their usful lives.

Specific Plans or Policies Relating to this Project:

Maintaining the Waterfront vessels extends their lives and saves the Department money.

Capital Costs:

Infrastructure:

Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront Vessel Reserve Fund 0 0 90,000 80,000 0 100,000 100,000 250,000 $620,000 $620,000 Waterfront Vessel Reserve Fund 0 0 0 0 0 0 0 0 $0 $0
Total 0 0 90,000 80,000 0 100,000 100,000 250,000 $620,000 $620,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Harbor Patrol Rescue Fire Boat Replacement Program
Description:

The Department established a Vessel Reserve Fund in FY 2015 in anticipation of replacing the antiquated patrol boat fleet and those funds will be used for this.

Specific Plans or Policies Relating to this Project:

City of Santa Barbara Local Coastal Plan (LCP) 2004, Page 118, Table 11 Fire Hazard: Component 8 (Wharf): " … wooden structure; people drop cigarettes … only protection is from harbor patrol boats …". Component 9 (Harbor): "Explosive & often exposed fuel tanks … fires can spread quickly …".

Capital Costs:

Status:

Harbor Patrol Boat #3 was built in 1999, is at the end of its useful life, and is currently being replaced in FY2025.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront Vessel Reserve Fund 0 800,000 0 0 0 0 0 2,000,000 $2,000,000 $2,800,000 Total 0 800,000 0 0 0 0 0 2,000,000 $2,000,000 $2,800,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Icehouse Renewal
Description:

The Waterfront Ice House is located on the City Pier in the Santa Barbara Harbor and has been providing high-quality flake ice for the commercial fishing industry since the mid 1990’s. The Ice House provides a critical service that supports the needs of the local commercial fishing industry.

The existing Ice House will soon exceeded its useful life. At times, the equipment fails requiring expensive and timely repairs. When replaced, it needs to be more evironmentally friendly and sustainable.

Specific Plans or Policies Relating to this Project:

Harbor Master Plan (1996) - DEP 5 "Ocean related and visitor serving facilities and uses shall be encouraged in order to support ocean dependent uses and activities".

Capital Costs:

Status:

Component replacement and operator safety improvements are in progress with prior approved CIP funds.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 13,180 247,766 0 0 0 0 0 2,500,000 $2,500,000 $2,760,946 Total 13,180 247,766 0 0 0 0 0 2,500,000 $2,500,000 $2,760,946 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Interior Dredging
Description:

City of Santa Barbara Waterfront Department, annual maintenance dredging of the Santa Barbara Harbor.

Federal Channel Dredging has consistently been federally funded as an Army Corps of Engineers project and the Federal budget typically identifies $2.9M to $3.2M.

Although the dredging contract is fully funded by the Army Corps, Waterfront budgets $25,000 non-capital funds per year for additional services including a lobbying consultant and $350,000 for miscellaneous harbor dredging.

In addition, per our loan requirements for the rebuilding of Marina One, the Waterfront established a reserve fund specific to projects within the Waterfront and have accrued sufficient funds to cover the anticipated interior dredging costs.

Specific Plans or Policies Relating to this Project:

City of Santa Barbara Waterfront Department, annual maintenance dredging of the Santa Barbara Harbor is critical to maintaining safe operations for the harbor’s commercial activities including commercial fishing and cruise ships. Santa Barbara Harbor impedes the transport of sand downcoast resulting in shoaling of the Federal Channel and potential coastal erosion at several coastal communities. The Corps conducted comprehensive studies of the harbor and determined that annual dredging of the harbor was necessary to maintain navigability and nourish downcoast beaches preventing erosion. The Harbor supports the mission of the US Coast Guard and also provides a staging area, facilities and resources required for oil spill prevention and response. This project has consistently been listed in the President’s Annual Budget Request to Congress and for FY21 the President’s budget identifies $2,900,000 which is slightly lower than the capability of $3,100,000 expressed by the Corps for FY21.

Capital Costs:

Status:

Obtaining permits and contracting for core sampling.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 13,804 93,773 0 0 250,000 250,000 250,000 1,500,000 $2,250,000 $2,357,576 Total 13,804 93,773 0 0 250,000 250,000 250,000 1,500,000 $2,250,000 $2,357,576 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Launch Ramp Improvements
Description:

The Launch Ramp is used extensively by the boating public, contractors and fisherman. This heavy use causes a lot of wear and tear on the launching facility that will need reconstructing at some point in the future.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (1) "That the lands shall be used by the city … for the improvement … of harbors and for construction, reconstruction, repair, maintenance, and operation of wharves, docks, piers, slips …".

Capital Costs:

Status:

Evaluating and planning
Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 0 0 0 250,000 0 800,000 $1,050,000 $1,050,000 Total 0 0 0 0 0 250,000 0 800,000 $1,050,000 $1,050,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Marina Annual Maintenance & Repair Program (Annual)
Description:

The Marina Annual Maintenance & Repair Program focuses on activities intended to renovate all four marinas and commercial buildings within the harbor.

Work typically involves structural upgrades to the docking system and upgrades or replacement of dilapidated utilities, replace dock boxes, gangways, and miscellaneous special projects which are conducted throughout the year. This program also addresses unforeseen maintenance of marina infrastructure and commercial buildings.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (1) " That the lands shall be used by the city … for the improvement … of harbors construction, reconstruction, repair, maintenance, and operation of wharves, docks, piers, slips …".

Capital Costs:

Status:

Planning, bidding and completion of higher priority project.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 221,498 350,000 250,000 250,000 250,000 250,000 250,000 1,000,000 $2,250,000 $2,821,498 Total 221,498 350,000 250,000 250,000 250,000 250,000 250,000 1,000,000 $2,250,000 $2,821,498 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Marina Replacement Program
Description:

Marinas Two, Three, and Four were reconstructed in the 1980s, including major repairs after the 1983 El Nino. The docking system is relatively old and complete replacement (similar to Marina One) should be considered.

Planning, engineering, permitting, and preparation of plans and specifications to solicit bids would be absorbed by the
Harbor Preservation Fund. Construction would be funded through a loan.

The marina will be replaced in-kind, in multiple phases. Work typically includes new concrete floats, utilities, and wooden decking.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (1) "That the lands shall be used by the city … for the improvement of harbors … construction, reconstruction, repair, maintenance, and operation of wharves, docks, piers, slip …".

Capital Costs:

Status:

Unfunded but initiating review, and planning.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 75,000 250,000 0 5,600,000 4,900,000 4,200,000 3,800,000 $18,750,000 $18,825,000 Total 0 75,000 250,000 0 5,600,000 4,900,000 4,200,000 3,800,000 $18,750,000 $18,825,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Mooring Program Expansion
Description:

The Waterfront is planning to expand the existing mooring area to provide daily, weekly, and monthly access to City owned moorings adjacent to Stearns Wharf. This will offer expanded service to recreational boaters. This will also provide a more secure mooring option as opposed to anchoring.

Additinally, this will eliminate the concern of anchors damaging critical desalination intake and wastewater outflow infrastructure.

Specific Plans or Policies Relating to this Project:

Need to ammend existing permit with California Coastal Commission to expand mooring field into an existing anchorage area Capital Costs:

Status:

Submitted California Coastal Commission permit amendment request Applied for $250,000 in grant funding through BoatUS Abandoned and Derelict Vessel grant program Infrastructure:

Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 180,000 0 0 0 0 200,000 $380,000 $380,000 Total 0 0 180,000 0 0 0 0 200,000 $380,000 $380,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Parking Lot Maintenance Program (Annual)
Description:

The annual Parking Lot Maintenance Program focuses on activities intended to maintain the eight parking lots in the Waterfront area. Work typically includes pavement preparation, grinding, crack sealing, slurry sealing, repaving, and painting stripes.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (4) "That the lands shall be used by the city … for the improvement of … streets, roads, parking facilities …".

Harbor Master Plan (1996) - SERV 1.10 "Review parking demand and needs prior to do any restriping of Harbor area parking lots …".

Capital Costs:

Status:

For FY2025, we will focus on the main roadway from Harbor Way to the Boat Launch Parking Lot.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 259,891 150,000 150,000 200,000 175,000 175,000 175,000 1,500,000 $2,375,000 $2,784,891 Total 259,891 150,000 150,000 200,000 175,000 175,000 175,000 1,500,000 $2,375,000 $2,784,891 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Parking Self Pay System Program (Annual)
Description:

Install and maintain SKIDATA parking kiosk equipment, and solar powered LUKE parking self pay stations throughout Waterfront Parking lots.

Required annual maintenance includes parts, equipment, and software upgrades and replacement.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (4) "That the lands shall be used by the city … for construction, reconstruction, repair and maintenance of parking facilities …".

Harbor Master Plan (1996) - FIS 1.3 "Sufficient operating revenue from landside buildings and other uses and facilities shall be raised in the Harbor and Wharf areas …".

Capital Costs:

Status:

Ongoing
Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 195,371 90,000 100,000 100,000 100,000 100,000 100,000 300,000 $800,000 $1,085,371 Total 195,371 90,000 100,000 100,000 100,000 100,000 100,000 300,000 $800,000 $1,085,371 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Replace City Pier Hoists
Description:

There are four hoists on the City Pier, and serve the commercial fishing industry.

Hoist #1 was replaced in FY20 and the others will need replacing as well due to the heavy use and ocean environment.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (6) " That the lands shall be used by the city …… for construction, reconstruction, repair and maintenance of hoists …". Harbor Master Plan (1996) - DEP 2.7 "Funding shall be pursued to upgrade the existing hoists".

Capital Costs:

Status:

Hoists will be serviced and maintained using Facilities Maintenance operational funds.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 0 0 0 0 200,000 600,000 $800,000 $800,000 Total 0 0 0 0 0 0 200,000 600,000 $800,000 $800,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Repower Harbor Patrol Vessel (Annual)
Description:

The Waterfront Department maintains 4 Harbor Patrol vessels that require new engines and hull work on a rotating basis which also helps to comply with new environmental regulations.

This program provides annual maintenance to Harbor Patrol vessels on a recurring basis.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 9(c) "The harbor shall be improved by the city … any vessel or other watercraft …".

Capital Costs:

Status:

Currently repowering Harboar Patrol boat #2, and Boat #1 will be replaced in FY2027 Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 80,894 200,000 0 120,000 0 0 0 500,000 $620,000 $900,894 Total 80,894 200,000 0 120,000 0 0 0 500,000 $620,000 $900,894 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Roof Replacement Program
Description:

Replace aging roofs at the Waterfront on an as-needed basis.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (1) "That the lands shall be used by the city … for the improvement of harbors … construction, reconstruction, repair, maintenance, and operation of wharves, docks, piers, slip …".

Capital Costs:

Status:

Biulding 107 roof was replaced in FY2025.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 240,000 75,000 150,000 85,000 90,000 125,000 950,000 $1,475,000 $1,715,000 Total 0 240,000 75,000 150,000 85,000 90,000 125,000 950,000 $1,475,000 $1,715,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Sea-Level Rise Adaptation
Description:

The City of Santa Barbara Sea-Level Rise Adaptation Plan calls out a number of near-term strategies for the Waterfront, Harbor, and Stearns Wharf that are recommended to start in the coming years to prepare for sea-level rise. Feasibility Study and 30-Year Waterfront Adaptation Plan (see both under Sustainability and Resilience Department).

Specific Plans or Policies Relating to this Project:

Sea-Level Rise Adaptation Plan
Capital Costs:

Status:

A grant was obtained to assist with a 30 year Feasibility Study.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 0 0 0 0 0 10,000,000 $10,000,000 $10,000,000 Total 0 0 0 0 0 0 0 10,000,000 $10,000,000 $10,000,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Security System Improvements
Description:

Update and maintain existing Security System by replacing existing camera infrastructure and installing additional equipment where needed.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (1) "That the lands shall be used by the city … for the improvement … of harbors and for construction, reconstruction, repair, maintenance, and operation of wharves, docks, piers, slips …".

Harbor Master Plan (1996) - Policy DEP 3 " … a priority is to provide … service to boating public …".

Cash & Association 2006 Evaluation.

Capital Costs:

Status:

Planning for FY23 phase of consolidating systems, and replace older cameras.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 0 0 150,000 0 150,000 500,000 $800,000 $800,000 Total 0 0 0 0 150,000 0 150,000 500,000 $800,000 $800,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Slip Metering Program
Description:

The Waterfront submeters its slipholders and bills back the consumption. Currently a hybrid system is in place, where about 40% are remotely read, and the remainder are manually read. The plan is to upgrade to all remotely read meters to help reduce staff time in the billing process and to be more efficient.

Specific Plans or Policies Relating to this Project:

We have aging meters that will need to be replaced anyway, and the Waterfront would like to convert its entire metering to remotely read meters to aid in the electric billing process.

Capital Costs:

Status:

Will try to incorporate this project with the proposed Marina replacement program if it becomes funded.

Infrastructure:

Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 100,000 0 0 100,000 100,000 100,000 1,000,000 $1,300,000 $1,400,000 Total 0 100,000 0 0 100,000 100,000 100,000 1,000,000 $1,300,000 $1,400,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Stearns Wharf Annual Maintenance Repair Program (Annual) Description:

The annual Stearns Wharf Heavy Timber & Pile Replacement Program focuses on activities intended to maintain the structural integrity of Stearns Wharf; a 1,950-foot long pier with over 2,000 piles, covering an area of 3.98 acres.

Work typically includes:
1) Remove, repair and/or replace new piles
2) Repair and/or replace pile caps, stringers, and decking 3) Recoat steel piles
Sound curtains will be used and the public will be warned and diverted around pile driving locations during daytime construction.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (1) "That the lands shall be used by the city … for the improvement of harbors … construction, reconstruction, repair, maintenance, and operation of wharves, docks, piers, slip …".

Stearns Wharf Structural Evaluation by Moffatt & Nichol Engineers, 2014.

Capital Costs:

Status:

Creating scope of work in November and advertise for bids in December 2022 Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 645,181 550,000 600,000 650,000 650,000 650,000 650,000 650,000 $3,850,000 $5,045,181 Total 645,181 550,000 600,000 650,000 650,000 650,000 650,000 650,000 $3,850,000 $5,045,181 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Stearns Wharf Promenade
Description:

Renovate and revitalize the seating and landscaped area at the base of Stearns Wharf to better program that space.

Capital Costs:

Infrastructure:

Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 50,000 0 300,000 0 0 0 $350,000 $350,000 Total 0 0 50,000 0 300,000 0 0 0 $350,000 $350,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Stearns Wharf Utility Infrastructure
Description:

Replace aging plumbing, mechanical, and electrical systems.

Specific Plans or Policies Relating to this Project:

State Tidelands Trust - Section 1.a (5) "That the lands shall be used by the city …for construction, reconstruction, repair and maintenance and operation of public buildings …".

Capital Costs:

Status:

Planning
Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 123,896 4,843 0 200,000 250,000 0 250,000 500,000 $1,200,000 $1,328,739 Total 123,896 4,843 0 200,000 250,000 0 250,000 500,000 $1,200,000 $1,328,739 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Sustainability Measures
Description:

Waterfont is working with City Sustainability & Resilience Department to take advantage of grant funding to improve sustainability, and incorporating sustainabiity in with other capital projects.

Specific Plans or Policies Relating to this Project:

Strategic Energy Plan, Climate Action Plan, General Plan Capital Costs:

Status:

Planning phase to install solar panels on Building 117.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 0 0 0 0 0 200,000 $200,000 $200,000
Total 0 0 0 0 0 0 0 200,000 $200,000 $200,000
Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Waterfront ADA Improvements and Upgrades
Description:

Capital Costs:

Infrastructure:

Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 0 0 50,000 25,000 25,000 25,000 2,500,000 $2,625,000 $2,625,000 Total 0 0 0 50,000 25,000 25,000 25,000 2,500,000 $2,625,000 $2,625,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Waterfront Fire Alarm Systems
Description:

The Waterfront and Stearns Wharf is the number one attraction to visitors in our area. Building and structures are also at risk of fires. Fire prevention and response is critical, and funds are needed to improve the fire alarm systems.

Specific Plans or Policies Relating to this Project:

City of Santa Barbara ADA Transition Plan by Gilda Puente Peters Architects, 2008.

State Tidelands Trust - Section 1.a (5) "That the lands shall be used by the city …for construction, reconstruction, repair and maintenance and operation of public buildings …".

Capital Costs:

Status:

Currently upgrading fire alarm system in Building 113, and in contract to installing additional systems on Stearns Wharf.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 72,398 95,000 50,000 0 0 0 0 400,000 $450,000 $617,398 Total 72,398 95,000 50,000 0 0 0 0 400,000 $450,000 $617,398 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Waterfront Restroom Upgrades
Description:

The Waterfront Restrooms are heavily used, and they are in constant need of a refreshing.

The remodeling will assist sith Americans with Disabilities Act (ADA) compliance.

Specific Plans or Policies Relating to this Project:

City of Santa Barbara ADA Transition Plan by Gilda Puente Peters Architects, 2018.

State Tidelands Trust - Section 1.a (5) "That the lands shall be used by the city …for construction, reconstruction, repair and maintenance and operation of public buildings …".

Capital Costs:

Status:

Commercial area restrooms to be refreshed in FY2025.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 9,998 0 100,000 150,000 100,000 100,000 0 1,500,000 $1,950,000 $1,959,998 Total 9,998 0 100,000 150,000 100,000 100,000 0 1,500,000 $1,950,000 $1,959,998 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT
Waterfront
Waterfront Utility Infrastructure Replacement
Description:

The Waterfront Department provides utilities for both boaters and tenants. The infrastructure for this needs to be updated and replaced on a regular basis to maintain a reliable system, and to address the wear and tear caused by a corrosive marine environment.

Capital Costs:

Status:

Evaluation and planning.

Infrastructure: Waterfront
Include in the HMP: No
Funding Sources Proposed 2025-2026 2026-2027 2027-2028 2028-2029 2029-2030 Total Prior Yr.

Expense
Current Yr.

Budget
Project
Future Needs Total
Waterfront 0 100,000 0 100,000 0 175,000 0 1,000,000 $1,275,000 $1,375,000 Total 0 100,000 0 100,000 0 175,000 0 1,000,000 $1,275,000 $1,375,000 Capital Program FY 2025-2026...FY 2029-2030

DRAFT DOCUMENT

FOR CITY COUNCIL REVIEW
on March 11, 2025

ATTACHMENT

← All documents from this meeting