Attachment No. 3
Bid Summary
PUBLIC RIGHT-OF-WAY ADA IMPROVEMENTS -
PACKAGE 1 PROJECT CE 20-21-09 (P1)
BID S
UMMARY* Bid Opening Date: January 5, 2022
ENGINEER’S ESTIMATE: $ 3,900,000.00
Contractor Total Bid ($) Percentage above/below
Engineer’s Estimate
Sposeto Engineering Inc. $ 3,419,956.69 12.3% below
Spencon Construction $ 3,588,913.50 8.0% below
IBS USA Inc $ 3,761,190.00 3.6% below
Terramark Gen Eng Contractors $ 3,893,539.00 0.2% below JJR Construction Inc $ 4,439,174.20 11.5% above
*Note: The values presented above reflect unevaluated Bids as received at bid opening and are subject to evaluation and correction pursuant to the Contract Documents.