Cities Index.
Amendment No. 2 to Bear Electrical Solutions, Inc. Agreement - Levi’s Naming Rights Existing Signage Lighting and Driver Repair

City Council and Authorities Concurrent
April 19, 2022

Document
Amendment No. 2 to Bear Electrical Solutions, Inc. Agreement - Levi’s Naming Rights Existing Signage Lighting and Driver Repair
Meeting
April 19, 2022
Body
City Council and Authorities Concurrent
Pages
3
Original file
132 KB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

83666.00002\34306245.1

Page 1 of 3 ends

AMENDMENT NO. 2

TO THE LEVI’S STADIUM ON-CALL ELECTRICAL MAINTENANCE AND REPAIR

CONTRACT

BETWEEN

THE FORTY NINERS STADIUM MANAGEMENT COMPANY, LLC

AND

BEAR ELECTRICAL SOLUTION, INC.

1. Parties and Date.

T h i s A m e n d m e n t N o . 2 t o t h e L e v i ’ s S t a d i um On-Call Electrical Maintenance and Repair Contract is made and entered into as of th is [***INSERT DAY***] day of April, 2022, by and between the Forty Niners Stadium Management Company, LLC (“Stadium Manager”) and Bear Electrical Solutions, Inc., a California corporation with its principal place of business at 1341 Archer Street, Alviso, CA 95002 (“Contr actor”). Stadium Manager an d Contractor are sometimes individually referred to as “Party” and collectively as “Parties.”

2. Recitals.

2 . 1 C o n t r a c t o r . T h e S t a d i u m M a n a g e r a n d Contractor have entered into an agreement entitled “Levi’s Stadium On-Call Electrical Maintenance and Repair Contract” (“Agreement”) for the purpose of retaining the services of Contractor to provide on-call stadium electrical maintenance and repair work.

2 . 2 A m e n d m e n t P u r p o s e . T h e S t a d i u m M a n ager and Contractor desire to amend the Agreement to increase the not-to-exceed compensation amount.

2 . 3 A m e n d m e n t A u t h o r i t y . T h i s A m e n d m e n t No. 2 is authorized pursuant to Section 3.7.1 of the Agreement.

3. Terms.

3.1 Amendment. Section 3.7.1 of the Agreemen t is hereby amended in its entirety to read as follows:

3.7.1 Amount of Compensation. As cons ideration for performance of the Work required herein, C ontractor shall receive compensation, including authorized reimbursements, for all Work rendered under this Contract at the rates set forth in Exhibit “G” attached hereto and incorporated herein by reference. The maximum compensation for Work to be provided pursuant 83666.00002\34306245.1

Page 2 of 3 ends

to each Task Order shall be set forth in the relevant Task Order. The total compensation to be provided under th is Contract by Stadium Manager to Contract, in the aggregate, shall not exceed Five Hundred Thousand Dollars ($500,000) for the first year of the C ontract term, Six Hundred Seventy Thousand Dollars ($670,000) for the second year of the Contract term, and Two Hundred Fifty Thousand Dollars ($250,000) for each subsequent contract year without written approval of the Stadium Manager. The term for subsequent fiscal years shall be conditioned upon approval of the Stadium Authority budget for the applicab le fiscal year that includes the amounts due under this Contract.

3 . 2 C o n t i n u i n g E f f e c t o f A g r e e m e n t . E x c e pt as amended by this Amendment No. 2, all other provisions of the Agreement remain in full force and effect and shall govern the actions of the parties under this Amendment No. 2. From and after the date of this Amendment No. 2, whenever the term “Agreement” appears in the Agreement, it shall mean the Agreement as amended by Amendment No. 1 and this Amendment No. 2.

3.3 Adequate Consideration. The Parties here to irrevocably stipulate and agree that they have each received adequate and independent consideration for the performance of the obligations they have undertaken pursuant to this Amendment No. 2.

3.4 Severability. If any portion of this Amen dment No. 2 is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions shall continue in full force and effect.

[Signatures on Next Page]

83666.00002\34306245.1

Page 3 of 3 ends

SIGNATURE PAGE FOR AMENDMENT NO. 2 TO LEVI’S STADIUM ON-CALL

ELECTRICAL MAINTENANCE AND REPAIR CONTRACT

BETWEEN THE FORTY NINERS STADIUM MANAGEMENT COMPANY, LLC AND BEAR ELECTRICAL SOLUTION, INC.

FORTY NINERS STADIUM

MANAGEMENT COMPANY, LLC

Approved By:

Jim Mercurio
Executive Vice President &
General Manager

Date

BEAR ELECTRICAL SOLUTION, INC.

Signature

Name

Title

Date

Andrew Bader
CFO

04.05.2022

← All documents from this meeting