4~i~' /~z ~t~m # 7
~-
City Council Meeting ~ April 19, 2022
clear sourceF ltl Alt'i IAL CONSU IT ING
• April 5, 2022 City Council Study Session
• Reviewed Proposed Fee Schedule Update for FY 22/23
Reviewed Proposed Parks and Recreation Cost Recovery
Policy
• This Evening's Item
• Public Hearing - FY 22/23 Fee Schedule Resolution
• Parks and Recreation Cost Recovery Policy Resolution
~~~T ~E~`~~~1C ~,A~~I~AAL
1 The City maintains a Master Fee Schedule identifying
applicable fees for various City services
Fees are reviewed and updated each year
Cities collect fees and charges for government
services performed at the request of, or specifically
for, a particular individual, business, or group... as
opposed to services performed for the community as
a whole
Building Fees -construction permit processing,
plan check, and inspection
Planning Fees -such as entitlement review
and review for compliance with zoning code
Engineering Fees -such as engineering
encroachment, and excavation review anc(
inspection
Fire Prevention Fees -such as fire alarm, fire
sprinkler, and construction review for compliance
with Fire Code
Non-Development Related Fees —such as
recreation fees, licensing, and permitting
2 Legal requirements
Encourage direct recovery of costs
incurred to serve private interests/benefit
or respond to individual actions
Provides General Fund resources
Enable continuity of service levels by
improving cost recovery levels
City Council Budget Principle Related to Cost Recovery for Fees ' With limited exceptions, establish fees based on full cost recovery where individuals/businesses rather than the
community at-large are benefitting from City services.

This preserves limited unrestricted resources for
providing services that benefit the community as a
whole:'
3 clear sourceF I II A ll C I A I C O N S U L T I N G
• Over 1,000 Fees Examined
87% of Fees are proposed to either decrease, remain unchanged, or reflect only minor adjustments (i.e., up to 10% or $10 change) 11% of fees are proposed to increase by more than 10%.

Primary drivers of increase are:
• Increases in the costs of equipment and materials recovered via fees Changes in personnel costs and services/supplies costs
• Changes in service requirements
A multi-year phase-in pattern is recommended for more than half of the fees proposed to increase by more than 10%. Immediate adjustment is primarily targeted only for new, discretionary activities.

• 24 New Fees are proposed
• Fees linked to enforcement of the California Fire Code • Fees for tree removal permits for non-Heritage trees
( Partial recovery is recommended for Single Family
Residence)
• Fees for complying with State legislation affecting City Planning review of development requests
• Fees for Zoning Compliance review of specific activity requests
• Fees for Review of Requests for Construction Using
Materials and Methods out of alignment with Building Codes 24 New Fees are proposed
• Fees for as-needed Code Enforcement Re-Inspections
• Fees for Review and Inspection of Facilities Operating with Fats, Oils, and Greases
• Fees for Electric Department Review at Project
~,,ti Clearance Committee
_ Fee for Extension of Expiring Encroachment Permits
• Fee for hydraulic modeling for new development
(Development Impact Analysis)
5 $24.8 MILLION
- --------------------- 100%MAXIMUM

COST RECOVERY

GENERAL FUND

REVENUE
— — 11Yo ACHIEVED

COST RECOVERY
- - ---'-- 0%MINIMUM

COST RECOVERY
$24.8 MILLION

Parks and Recreation programs are budgeted in the General Tax revenue sources in the General Fund which are
collected from the community at-large pay for program costs that are not recovered from user fees
The General Fund has a projected deficit the City must
address through revenue increases and/or expenditure
reduction decisions
City departments in the General Fund are tasked with
closing the deficit to varying degrees
• • • ~ t!~ ', ~.-
- -- ---~,
Three commissions: Parks &Recreation, Senior
Advisory, and Youth Commissions
Community Survey — 234 Responders
(Commissioners and General Public)
Establish a common understanding for evaluating
Parks and Recreation financial needs and user fees
Receive Commission and public input on cost
recovery policy affecting program cost recovery
decisions
Fund

COMMUNITY 84% of responders support discounted
VALUES
fees for low-income participants
Make a Way for 94% of responders recommended higher
People to fees for non-resident participants
Participate
Community and Individual both benefit
Prioritize Santa from fee-based recreation
Clara Resident programming. Balanced cost
Participation recovery approach.

COST RECOVERY BENEFIT TIERS

PROGRAM COST RECOVERY

BENEFICIARY TARGETED
i
100%+indicates minor exceptions where premiums above cost may be justified, such as market-based rentr.

Most program fees are managed dynamically by departments as offerings, demand, and other market conditions change seasonally It is impractical for governing bodies to revise and adopt program fees as frequently as programs change through the year
Cost recovery policy for the agency's parks and recreation programs is defined by its governing body (council)
Adopted cost recovery policy creates the boundaries for program fees set and managed by the department on a continual basis Staff will provide periodic reports to City Council on the efFect of cost recovery levels on participation and revenues and refine the policy over time
Concern for small subsets of vulnerable users
should not drive the placement of program cost
recovery policy impacting all users of the
prog ra m
Council can direct policy on lower cost recovery
goals, fee discounts, or fee waivers for defined
users, such as low-income populations
Department establishes practices for identifying
and supporting users targeted by adopted policy
All discounts and fee waivers are subsidized by
the General Fund

• Updates to FY 2022/23 Municipal Fee Schedule
• One new fee; revisions to fees; clarifying language
• Updates to the Park &Recreation Cost Recovery Policy
• Revisions to program tiers and policy
~ •Responses to questions and comments from City Council/public • Responses to specific questions included in RTC 22-99 • Fee clarifications, community room rental discussion, Parks & Recreation Cost Recovery Policy information, fee subsidies and definition/treatment of non-profits, revenue generation and cost- recovery goals
10 • Electric Utility Department
• Facilities < 12kV under the Load Development: removed 'commercial" • Parks and Recreation
• Updated In-Lieu fees for Quimby Act and Mitigation Fee Act (separate report on this agenda (RTC 22-302) for land valuation data and calculations) • Updated Cost Recovery Policy to reflect April 5"' Study Session feedback • Updated Recreation Fees based on the revised Cost Recovery Policy • Police
• Added clarifying language to the Residential Parking Permit fee • Public Works
• Added Justification for Increase in in Fees, Rates, and Charges page (inadvertently omitted from original document)
• Updated Sanitary Sewer Outlet Conveyance Fee to reflect no fee change 11 USED COMMUNITY INPUT AND CITY COUNCIL DIRECTION TO

INFORM POLICY AND GUIDELINES

PROGRAM COST RECOVERY

BENEFICIARY TARGETED
Changes to Policy Based on Feedback
Three categories of users: residents, non-profits, all others Changes to cost-recovery tiers for certain programs; examples:

Competitions, meets, and tournaments: moved from cost
recovery target of 71-90% to the lower level of 41-70%
Non-profits and community groups: moved from 41-70% cost recovery to 1-20% cost recovery for facility (meeting rooms or social gatherings) use and the non-profit event fee
Programs providing considerable individual benefit (e.g., dance class, pottery, keyboard) are now placed into the 71-90% cost recovery target due to their considerable individual benefit 12 100°k+indicates minor exceptions where premiums above cost may be justif ed, such as market-based rents.

Programs with the highest level of community benefit will have the lowest level of cost recovery
Programs that have the greatest level of individual or
group benefit will target the highest level of cost recovery Pricing of programs and services takes into account
market rates and the impact on demand which may
override cost-recovery target considerations
• Non-resident fees are priced higher than resident fees • Fees will be periodically reviewed to keep pace with
changes in the cost of living, market demands, and/or to promote identified Recreation Programs
• Staff will adjust fees to meet minimum cost-recovery rates and to be consistent with market demand for services
• The City will continue to offer a grant program to offset the cost of programs for eligible low-income participants identified through its established procedures
13 • Proposed fee schedule provides uniform rate for rental of parks and recreation facilities by non-profit organizations for meeting use
• $20 per meeting
• Staff will meet with Board of Library Trustees and return with proposed library room rental fees in June 2022.
• Proposed recommendations to be presented to Board
include uniform rate of $20 per meeting (i.e., reduced rental rate)
• Elimination of Technology Fee for library room rental • Proposed fee schedule includes $14 per hour reserved
field use charge for non-profit organizations
• Charge is consistent with charges imposed by other regional agencies
• City of Campbell: $20 - $30 per hour with discount
. based on percentage of resident participation
• City of Mountain View: $8 per hour
• City of Novato: $9 - $15 per hour
• City of Palo Alto: $9 - $30 per hour
• City of San Rafael: $20 - $25 per hour
• City of Sunnyvale: $25 per hour or $175 per day
14 Estimated revenue impact of proposed changes is
$1.4M
Recovers increasing costs in the General Fund as well
as other funds.
~~ Estimated revenue change for Parks &Recreation is
approximately $0.6 million.
15 16

17 .~" GL~Rq c-.
y~P '`~ city ofO .~~ ~~]~ O
' ~~ f'a i
~~~~ ~' -Santa Clara" ~FN~aSiON" ... .......
.4~~.

Tfl•' Cr: rit^.i cif 4+ilril's f'~~a mil ~l:;
Date: April 19, 2022
To: City Manager
From: Executive Assistant to the Mayor &City Council
Subject: Correspondence received regarding Item 7 on the April 19, 2022, City Council Meeting Agenda
As of April 19, 2022, at 3:00 p.m. the Mayor and City Council Offices received the attached correspondence regarding agenda item 7. Public Hearing: Action on the Adoption of the Proposed FY 2022/23 Municipal Fee Schedule and Parks &Recreation Cost Recovery Policy.

Melissa Lee
Executive Assistant to the
Mayor &City Council
Documents Related to this Report:
1) Communications received
POST MEETING MATERtAI.

Melissa Lee
From: Chris Janson <[email protected]>
Sent: Friday, April 15, 2022 10:18 AM
To: Mayor and Council
Cc: Cynthia Bojorquez; Manuel Pineda; James Teixeira
Subject: City of Santa Clara - Park Fee
Attachments: PHD Park Fee Letter - 04152022 Raintree.pdf Dear Mayor and Council;
Please find enclosed a letter requesting a pipeline exemption from the proposed fee increase related to our project at 3105 Patrick Henry, which is within the approved Patrick Henry SP. We have been an active participant in this process since 2016 and appreciate your consideration of our request as well as your support of our project.

Best Regards,
Chris Janson
Chris Janson ~ Regional President
Raintree Investment Corp
O: (602) 955-1375

RAI NTREEINVESTMENT CORPORATION
April 15, 2022
The Honorable Lisa Gillmor, Mayor
City of Santa Clara
1500 Warburton Ave.

Santa Clara, CA 95050
Via Email: [email protected]
Re: Proposed Park Fee Increase -Master Fee Schedule 2022-2023 Patrick Henry Specific Plan
Dear Mayor and City Councilmembers:

W e very much appreciate your support and recent approval of the Patrick Henry Drive Specific Plan ("PHD SP"). We are extremely excited that the City is providing an opportunity to create the much needed market rate and affordable housing as well as new public parks and other community amenities in Santa Clara.

Following the City Council's adoption of the Plan, we received notice of the 2022-2023 Proposed Master Fee Schedule, including a 15% Parl< Impact Fee increase. This increase will male housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure and long-term maintenance costs.

As of the August 2019 City Council meeting, the PHD SP was scheduled for adoption in "Late Summer 2020". This would have allowed our project application to fall under the 2020-2021 Master Fee Schedule if deemed complete by June 2021, a feasible and practical assumption.

Unfortunately, the Plan was not adopted until March 2022, placing an application to be deemed complete under the Proposed 2022-2023 Master Fee Schedule. The PHD SP funding stakeholders have collaborated throughout this process despite schedule delays, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements.

The proposed 2022-2023 MFA Parl< Fee for the PHD SP area of $43,472 per unit represents a 12 554 increase per unit, or 40.6% increase in Parl< Fees from the time when stakeholders expected they would be deemed complete. We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Parl< Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.

Thank you in advance for your consideration of and we sincerely appreciate your support.

Sincerely,
~ ~~
Chris Janson ~ Regional President
2753 Camino Capistrano A-201, San Clemente CA. 92672

RAI NTREEINVESTMENT CORPORATION
Cc: Cynthia Bojorquez, Assistant City Manager
Manuel Pineda, Assistant City Manager
James Teixeira, Director of Parl<s &Recreation
2753 Camino Capistrano A-201, San Clemente CA. 92672

Melissa Lee
From: James Suh <[email protected]>
Sent: Friday, April 15, 2022 10:44 AM
To: Mayor and Council
Cc: Cynthia Bojorquez; Jimmy Park; Manuel Pineda; James Teixeira Subject: Letter regarding Park Fees
Attachments: 4590 Patrick Henry Drive -Park Fee Letter.pdf Dear Mayor Gillmor,
Please find a letter concerning the agenda item coming to the Council's attention on April 19th, 2022. Thank you very much for your consideration.

James
James Suh
KASA Partners
[email protected]
www.kasa-partners.com
650.773.2557

• KASAPARTNERS
April 15, 2022
The Honorable Lisa Gillmor, Mayor
City of Santa Clara
1500 Warburton Ave.

Santa Clara, CA 95050
Via Email: [email protected]
Re: Proposed Parl< Fee Increase -Master Fee Schedule 2022-2023 Patrick Henry Specific Plan
Dear Mayor and City Councilmembers:

W e represent the landowner at 4590 Patrick Henry Drive. Thank you very much for your support and recent approval of the Patrick Henry Drive Specific Plan ("PHD SP"). We are very excited that the City is providing an opportunity to create much needed market rate and affordable housing as well as new public parks and other community amenities in Santa Clara.

Following the City Council's adoption of the Plan, we received notice of the 2022-2023 Proposed Master Fee Schedule, including a 15% Parl< Impact Fee increase. This increase will male housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure and long-term maintenance costs.

As of the August 2019 City Council meeting, the PHD SP was scheduled for adoption in "Late Summer 2020".This would have allowed a project application to fall under the 2020-2021 Master Fee Schedule if deemed complete by June 2021, a feasible and practical assumption.

Unfortunately, the Plan was not adopted until March 2022, placing an application to be deemed complete under the Proposed 2022-2023 Master Fee Schedule. The PHD SP funding stakeholders have collaborated throughout this process despite schedule delays, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements.

The proposed 2022-2023 MFA Parl< Fee for the PHD SP area of $43,472 per unit represents a 12 554 increase per unit, or40.6°o increase in Parl< Fees from the time when stakeholders expected they would be deemed complete. We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Parl< Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.

W e thank you for your consideration in this important matter. Thank you. 50 CALIFORNIA STREET, SUITE 1500, SAN FRANCISCO, C~ 94111

• KASAPARTNERS
Sincerely,
~~,
James Suh
<ASA Partners
Owner's Representative, 4590 Patrick Henry Drive LLC
Cc: Jimmy Parl<, 4590 Patrick Henry Drive LLC
Cynthia Bojorquez, Assistant City Manager
Manuel Pineda, Assistant City Manager
James Teixeira, Director of Parl<s &Recreation
50 CALIFORNIA STREET, SUITE 1500, SAN FRANCISCO, CA 94111

Melissa Lee
From: Breeze, Elaine <[email protected]>
Sent: Friday, April 15, 2022 1:31 PM
To: Mayor and Council
Cc: Cynthia Bojorquez; Manuel Pineda; James Teixeira; [email protected]; Zeiszler, Jeffrey
Subject: Proposed 2022-2023 Master Fee Schedule -Park Impact Fee Increase -Patrick Henry Drive Specific Plan
Attachments: PHD Park Fee Letter - 04152022 SummerHill Apt Communities.pdf Good Afternoon Mayor Gillmor and City Councilmembers,
As a stakeholder in the Patrick Henry Specific Plan area, attached please find a letter of request regarding the proposed parl<fee increase
Thank you for your consideration and please let me Know if you have any questions.

Best Regards,
Elaine
Elaine Breeze
Senior Vice President of Development
SummerHill Apartment Communities ~ SummerHill Homes
777 S. California Avenue, Palo Alto, CA 94304
Tel (650) 842-2404 •Mobile (415) 971-0660
[email protected]
All ~ubj=_ct matter contained in this email is ~onfidenti?I and proprietary to SummerHill Hom=s/SummerHill ;p~rtment Communities and should not be disclosed to any person not listed as an ori;inal recipient. S~nnrnerHill Homes/ SummerHili Apartment Communities. All ri;hts reserved. 1 COMMUNITIES OF DISTINCTION
April 15, 2022
The Honorable Lisa Gillmor, Mayor
City Council
City of Santa Clara
1500 Warburton Ave.

Santa Clara, CA 95050
Via Email: [email protected]
Re: Proposed Park Fee Increase -Master Fee Schedule 2022-2023 Patrick Henry Specific Plan
Dear Mayor Gillmor and City Councilmembers:

Thank you very much for your support and recent approval of the Patrick Henry Drive Specific Plan ("PHD SP"). We are very excited that the City is providing an opportunity to create much needed market rate and affordable housing as well as new public parks and other community amenities in Santa Clara.

Following the City Council's adoption of the Plan, we received notice of the 2022-2023 Proposed Master Fee Schedule, including a 15%Park Impact Fee increase. This increase will make housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure and long-term maintenance costs.

As of the August 2019 City Council meeting, the PHD SP was scheduled for adoption in "Late Summer 2020". This would have allowed a project application to fall under the 2020-2021 Master Fee Schedule if deemed complete by June 2021, a feasible and practical assumption.

Unfortunately, the Plan was not adopted until March 2022, placing an application to be deemed complete under the Proposed 2022-2023 Master Fee Schedule. The PHD SP funding stakeholders have collaborated throughout this process despite schedule delays, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements.

The proposed 2022-2023 MFA Park Fee for the PHD SP area of $43,472 per unit represents a $12,554 increase per unit, or 40.6% increase in Park Fees from the time when stakeholders expected they would be deemed complete.

We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Park Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.

Thank you for your consideration of and we sincerely appreciate your support.

Very truly yours,
~ oulnt, ~jV~.ti'~t,
Senior Vice President of Development
Cc: Cynthia Bojorquez, Assistant City Manager
Manuel Pineda, Assistant City Manager
James Teixeira, Director of Parks &Recreation
777 S. California Avenue, Palo Alto, CA 94304 phone 650.842.4040 fax 650.857.1077 SHApartments.com

Melissa Lee
From: Lynn Lin (SC) <[email protected]>
Sent: Friday, April 15, 2022 2:58 PM
To: Mayor and Council
Cc: Clerk; Manager; Parks and Recreation; yimin_zimmerer; Jane Zhang (SC); Lynn Lin (SC) Subject: Patrick Henry Drive Specific Plan Park Fee
Attachments: 4-15-2022 Letter to Santa Clara City Council PHD Park Fee.pdf Dear Mayor and Members of the City Council:

Thank you very much for your adoption of the Patrick Henry Drive Specific Plan ("PHD SP") at the City Council Hearing on M arch 22, 2022. All of us at 02Micro are extremely grateful that you responded to our concerns promptly during the City's public review process and supported us as you always Kindly have. Thank you again for your leadership and care.

Post the adoption of the Plan, we received a notice of the 2022-2023 Proposed Master Fee Schedule which suggests an additional 15% Parl< Impact Fee increase. This increase will male housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure and long-term maintenance costs. Due to the 2-year delay of the Plan adoption, the PHD SP funding stakeholders already have to face many challenges, including but not limited to, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements. The proposed 2022-2023 M FA Parl< Fee for the PHD SP area of $43,472 per unit represents a $12,554 increase per unit, or 40.6% increase in Parl< Fees from the time when stakeholders expected they would be deemed complete. We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Parl< Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.

Thank you for your consideration of and we sincerely appreciate your support.

Respectfully subinittecl,
Yun Lin
President t 02Micro
3118 Patrick Heiuy Drive, Santa Clara, CA 95054
Tel: 408-987-5920 f [email protected]

Page 1 of 2 ends

April 15, 2022
Via E»~ail: 111cr~~o~~1~~~dCouncil(c~s~mtaclaraca.

Honorable Mayor Gillmor aild Members of the City Cotulcil City of Sazlta Clara
1500 Warburton Avenue
Santa Clara, CA 95050
Re: Proposed Pat~k Fee Increase -Master Fee Schedule 2022-2023 Patrick Hemy Specific Plan
Dear Mayor and Members of the City Council:

Thank you very much for ~~our adoption of the Patrick Herll•y Drive Specific Plan ("PHD SP") at the City Council Hearing on March 22, 2022. All of us at 02Micro are eltremely gratefill that you responded to our concerns promptly daring the City's public review process and supported Lis as you always kindly have. Thank you again for your leadership and care.

Post the adoption of the Plan, we received a notice of the 2022-2023 Proposed Master Fee Schedule which suggests an additional 15% Parlc Impact Fee increase. This increase will make housing infeasible in the PHD SP, ah•eady burdened by extraordinary parkland, infrastruchue and lolig-term maintenance costs. Due to the 2-yeas delay of the Plan adoption, the PHD SP funding stakeholders already have to face many challenges, including but not limited to, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements. The proposed 2022-2023 MFA Parlc Fee for the PHD SP area of $43,472 per unit represents a $12 SSA inc~°ease ~er~ zfnit or X0.6% increase in P~rlc Fees fi•o111 the time when stakeholders expected they would be deemed complete. We i•espectfiilly request that the City Council provide a pipeline status to the Pan•icic Henry Plan Specific Plan under the 2021-2022 M aster Fee Schedule Park Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications ai d preserve the feasibility of the plan.

Thank you for your• consideration of and we sincerely appreciate your support.

Respectfully submitted,
Yun Lin
President ~ 02Micro
3118 Patrick Henry Drive, Santa Clara, CA 95054
Tel: X08-987-5920 ~ lyim.lin a o2micro.com
Cc: Hossam Haggag, City Clerlc
Cynthia Bojorquez, Assistant City Manager

Page 2 of 2 ends

M anuel Pineda, Assistant City Manager
James Teixeira, Director of Parlcs &Recreation
Lynn Lin
Yiinin Zimmerer
Jane Zhang

Melissa Lee
From: Sean Kim <[email protected]>
Sent: Friday, April 15, 2022 3:41 PM
To: Mayor and Council
Cc: Cynthia Bojorquez; Manuel Pineda; James Teixeira; George Casey; Huiwen Zhu; Yonggang Cui; Paul Mann
Subject: Re: PHD Park Fee - A request for pipeline exemption for the fee increase Attachments: City of Santa Clara Park Fee Letter - PHD_Z&L_20220415_SK ZLP.pdf Dear Mayor and City Councilmembers:

Thank you very much for your support and recent approval of the Patrick Henry Drive Specific Plan ("PHD SP"). We are very excited that the City is providing an opportunity to create much needed market rate and affordable housing as well as new public parks and other community amenities in Santa Clara.

Following the City Council's adoption of the Plan, we received notice of the 2022-2023 Proposed Master Fee Schedule, including a 15% Park Impact Fee increase. This increase will male housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure and long-term maintenance costs.

As of the August 2019 City Council meeting, the PHD SP was scheduled for adoption in "Late Summer 2020".This would have allowed a project application to fall under the 2020-2021 Master Fee Schedule if deemed complete by June 2021, a feasible and practical assumption.

Unfortunately, the Plan was not adopted until March 2022, placing an application to be deemed complete under the Proposed 2022-2023 Master Fee Schedule. The PHD SP funding stakeholders have collaborated throughout this process despite schedule delays, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements.

The proposed 2022-2023 MFA Parl< Fee for the PHD SP area of $43,472 per unit represents a $12,554 increase per unit, or 40.6% increase in Pari< Fees from the time when stakeholders expected they would be deemed complete. We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Parl< Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.

Thank you for your consideration of and we sincerely appreciate your support.

Sean I(im
Director of Design and Development

Z & L PROPERTIES, INC
950 Tower Ln Suite 870
Foster City CA 94404
Cell (925)856-0848
[email protected]
~~ Z&L~ PROPERTIES

~~Z&L~ PROPERTIES
April 15, 2022
The Honorable Lisa Gillmor, Mayor
City of Santa Clara
1500 Warburton Ave.

Santa Clara, CA 95050
Via Email: [email protected]
Re: Proposed Parl< Fee Increase -Master Fee Schedule 2022-2023 Patrick Henry Specific Plan
Dear Mayor and City Councilmembers:

Thank you very much for your support and recent approval of the Patrick Henry Drive Specific Plan ("PHD SP"). We are very excited that the City is providing an opportunity to create much needed market rate and affordable housing as well as new public parks and other community amenities in Santa Clara.

Following the City Council's adoption of the Plan, we received notice of the 2022-2023 Proposed Master Fee Schedule, including a 15% Parl< Impact Fee increase. This increase will make housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure and long-term maintenance costs.

As of the August 2019 City Council meeting, the PHD SP was scheduled for adoption in "Late Summer 2020". This would have allowed a project application to fall under the 2020-2021 Master Fee Schedule if deemed complete by June 2021, a feasible and practical assumption.

Unfortunately, the Plan was not adopted until March 2022, placing an application to be deemed complete under the Proposed 2022-2023 Master Fee Schedule. The PHD SP funding stakeholders have collaborated throughout this process despite schedule delays, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements.

The proposed 2022-2023 MFA Parl< Fee for the PHD SP area of $43,472 per unit represents a 12 554 increase per unit, or 40.6% increase in Parl< Fees from the time when stakeholders expected they would be deemed complete. We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Pari< Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.

Thank you for your consideration of and we sincerely appreciate your support.

Very truly yours,
Sean I<im, Director, Z&L Properties, Inc
Cc: Cynthia Bojorquez, Assistant City Manager
Manuel Pineda, Assistant City Manager
James Teixeira, Director of Parl< &Recreation

Melissa Lee
From: Carrie Priest <[email protected]>
Sent: Monday, April 18, 2022 10:27 AM
To: Mayor and Council
Cc: Cynthia Bojorquez; Manuel Pineda; James Teixeira
Subject: PHD Park Fee Letter: 04/18/2022
Attachments: PHD Park Fee Letter 04182022.pdf
Importance: High
Dear Mayor and City Councilmembers,
Please see attached letter in response to the PHD pari< fee increase.

Tha n I< yo u,
Carrie Priest
Property Manager
DRE License #02147560
M: (650) 642-4907
E: carrieCa~dollinaer~rooerties.com
555 Twin Dolphin Dr. #600
Redwood City, CA 94065
www.dollinaeraroaerties.com
CSLB# 805772 DRE# 02116818

DOLLINGER PROPERTIES
April 18, 2022
The Honorable Lisa Gilimor, Mayor
City of Santa Clara
1500 Warburton Ave.

Santa Clara, CA 95050
Via Email: [email protected]
Re: Proposed Parl< Fee Increase -Master Fee Schedule 2022-2023 Patrick Henry Specific Plan
Dear Mayor and City Councilmembers:

Thank you very much for your support and recent approval of the Patrick Henry Drive Specific Plan ("PHD SP"). We are very excited that the City is providing an opportunity to create much needed market rate and affordable housing as well as new public parks and other community amenities in Santa Clara.

Following the City Council's adoption of the Plan, we received notice of the 2022-2023 Proposed Master Fee Schedule, including a 15% Pari< Impact Fee increase. This increase will male housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure, and long-term maintenance costs.

As of the August 2019 City Council meeting, the PHD SP was scheduled for adoption in "Late Summer 2020".This would have allowed a project application to fall under the 2020-2021 Master Fee Schedule if deemed complete by June 2021, a feasible and practical assumption.

Unfortunately, the Plan was not adopted until March 2022, placing an application to be deemed complete under the Proposed 2022-2023 Master Fee Schedule. The PHD SP funding stakeholders have collaborated throughout this process despite schedule delays, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements.

The proposed 2022-2023 MFA Parl< Fee for the PHD SP area of $43,472 per unit represents a 12 554 increase per unit, or 40.6°o increase in Parl< Fees from the time when stakeholders expected they would be deemed complete. We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Parl< Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.
555 Twin Dolphin Drive, Suite 600 Redwood City, CA 94065 650/508 8666 FAX 650/508 8686 www.dollingerproperties.com • CSLB Lic. 1J805772 • Broker Lic. #02116818

DOLLINGE2 PROPERTIES
Thank you for your consideration of and we sincerely appreciate your support.

Very truly yours,
David B. Dollinger
Cc: Cynthia Bojorquez, Assistant City Manager
Manuel Pineda, Assistant City Manager
James Teixeira, Director of Parl<s &Recreation
555 Twin Dolphin Drive, Suite 600 Redwood City, CA 94065 650/508 8666 FAX 650/508 8686 www.dollingerproperties.com • CSLB Lic. #805772 • Broker Lic. 1102116818

Melissa Lee
From: Dennis Martin <[email protected]>
Sent: Monday, April 78, 2022 1:04 PM
To: Mayor and Council
Subject: Proposed Park Fee Increase -Master Fee Schedule 2022-2023 - PHDSP Greetings Mayor and Councilmembers,
BIA Bay Area is fully in support of enacting a "pipeline" exemption of Parkland Dedication In Lieu and other fee increases as requested by the Patrick Henry Drive Specific Plan builders. Through no fault of the Plan's builders, the timeline for approval of the PHDSP was delayed until just last month, extending the projected date of completed project applications until later this year. COVID 19 protocols, staffing shortages, and other extenuating circumstances have led to this frustrating predicament for the Plan's builders wherein fee increases, construction materials and labor cost increases, and other negative financial hits are pushing projects closer to infeasibility.

BIA respectfully requests that the City Council recognize this untenable situation and provide the PHDSP builders with a one year pipeline exemption to proceed under the current Parkland Dedication and In lieu and Municipal Fee schedule.

Very truly yours,
Dennis Martin
BIA Government Affairs
~ ~ BAY AREA

Melissa Lee
From: Jeff Smith <[email protected]>
Sent: Tuesday, April 19, 2022 8:16 AM
To: Mayor and Council
Subject: Park Fees -Patrick Henry Drive Specific Plan
Attachments: PHD Park Fee Letter - 04152022_F.pdf
Honorable Mayor and Council,
Please accept the attached letter for your consideration.

Regards,
Jeff
Jeii Smith
Dis~ector, I:~~idential DeveloprnenE
901 Mariners Island [3o~alevard, Suite 700
San Mateo, CA 9A409
~sso~ 377-ss~o -o ~n~5~ a~z-~~a~ -c
www.srgnc.com

`~~ I<.I:~;`~ REGIS
April 15, 2022
The Honorable Lisa Gillmor, Mayor
City of Santa Clara
1500 Warburton Ave.

Santa Clara, CA 95050
Via Email: [email protected]
Re: Proposed Parl< Fee Increase -Master Fee Schedule 2022-2023 -Patrick Henry Specific Plan Dear Mayor and City Councilmembers:

Thanl<you very much for your support and recent approval of the Patrick Henry Drive Specific Plan ("PHD SP") W e are very excited that the City is providing an opportunity to create much needed market rate and affordable housing as well as new public parks and other community amenities in Santa Clara.

Following the City Council's adoption of the Plan, we received notice of the 2022-2023 Proposed Master Fee Schedule, including a 15% Parl< Impact Fee increase. This increase will male housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure and long-term maintenance costs.

As of the August 2019 City Council meeting, the PHD SP was scheduled for adoption in "Late Summer 2020" This would have allowed a project application to fall under the 2020-2021 Master Fee Schedule if deemed complete by June 2021, a feasible and practical assumption. Unfortunately, the Plan was not adopted until M arch 2022, placing an application to be deemed complete under the Proposed 2022-2023 Master Fee Schedule. The PHD SP funding stakeholders have collaborated throughout this process despite schedule delays, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements.

The proposed 2022-2023 MFA Parl< Fee for the PHD SP area of $43,472 per unit represents a $12,554 increase per unit, or 40.6°o increase in Parl< Fees from the time when stakeholders expected they would be deemed complete. We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Parl< Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.

Thank you for your consideration of and we sincerely appreciate your support.

Very truly yours,
. ~
Jeff Smith, Director, Sares Regis Group
Cc: Cynthia Bojorquez, Assistant City Manager, Manuel Pineda, Assistant City Manager, James Teixeira, Director of Parl<s &Recreation
Sares Regis Group of Northern California
901 Mariners Island Blvd. Ste 700, San Mateo, CA. 94404

~~~ ~Melissa Lee
From: Eric Morley <[email protected]>
Sent: Tuesday, April 19, 2022 3:06 PM
To: Mayor and Council
Cc: Cynthia Bojorquez; Manuel Pineda; James Teixeira; [email protected] Subject: City of Santa Clara Park Fee -Pearlman Properties Comments April 19, 2022
The Honorable Lisa Gillmor, Mayor
City of Santa Clara
1500 Warburton Ave.

Santa Clara, CA 95050
Via Email: [email protected]
Re: Proposed Park Fee Increase -Master Fee Schedule 2022-2023 Patrick Henry Specific Plan
Dear Mayor and City Councilmembers:

On behalf of Pearlman Properties, we would like to thank you very much for your support and recent approval of the Patrick Henry Drive Specific Plan ("PHD SP"). We are very excited that the City is providing an opportunity to create much needed market rate and affordable housing as well as new public parks, employment opportunities and other community amenities in Santa Clara.

Following the City Council's adoption of the Plan, we received notice of the 2022-2023 Proposed Master Fee Schedule, including a 15% Parl< Impact Fee increase. This increase will male housing infeasible in the PHD SP, already burdened by extraordinary parkland, infrastructure and long-term maintenance costs.

As of the August 2019 City Council meeting, the PHD SP was scheduled for adoption in "Late Summer 2020". This would have allowed a project application to fall under the 2020-2021 Master Fee Schedule if deemed complete by June 2021, a feasible and practical assumption.

Unfortunately, the Plan was not adopted until March 2022, placing an application to be deemed complete under the Proposed 2022-2023 Master Fee Schedule. The PHD SP funding stakeholders have collaborated throughout this process despite schedule delays, increased PHD SP and implementation costs, and increased public parkland dedication acreage requirements.

The proposed 2022-2023 MFA Parl< Fee for the PHD SP area of $43,472 per unit represents a $12,554 increase per unit, or40.6°o increase in Parl< Fees from the time when stakeholders expected they would be deemed complete. We respectfully request that the City Council provide a pipeline status to the Patrick Henry Plan Specific Plan under the 2021-2022 Master Fee Schedule Parl< Impact Fee rate for at least one year or longer from PHD SP adoption to allow stakeholders to process applications and preserve the feasibility of the plan.

Thank you for your consideration of and we sincerely appreciate your support.

Very truly yours,

POST MEETING MATERIAL

Eric Morley
The Morley Bros.

Cc: Cynthia Bojorquez, Assistant City Manager
M anuel Pineda, Assistant City Manager
James Teixeira, Director of Paris &Recreation
Eric Morley, Principal
The Morley Bros.
475 Alberto Way, Suite 210
Los Gatos, CA 95032
www.morleybros.com
[email protected]
408.497.9722