Cities Index.
Planning Commission Staff Report of March 9, 2022

City Council and Authorities Concurrent
May 10, 2022

Document
Planning Commission Staff Report of March 9, 2022
Meeting
May 10, 2022
Body
City Council and Authorities Concurrent
Pages
1
Original file
9.4 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-130 Agenda Date: 3/9/2022

REPORT TO PLANNING COMMISSION

SUBJECT
Action on a Vesting Tentative Subdivision Map for 1530 and 1540 Pomeroy Avenue

BACKGROUND
The Applicant, Ridgecrest Group Inc., is requesting approval of a Vesting Tentative Subdivision Map (PLN21-15320) to subdivide two residential parcels with a total lot area of approximately 21,000 square feet into eight condominium lots and a common parcel at 1530 and 1540 Pomeroy Avenue for the development of eight condominium units. The project site is located on the west side of Pomeroy Avenue between El Camino Real and Granada Ave. The project would construct two detached single -family residences on the southern parcel (1530 Pomeroy Avenue) that borders single-family residences to the west and to the south. The parcel on the north (1540 Pomeroy Avenue) that borders commercial uses to the north and the west, would be occupied with six, three-story attached townhomes.

Currently, the property contains two parcels. The parcel at 1530 Pomeroy Avenue is zoned Low Density Multiple Dwelling (R3-18D) and has a General Plan land use designation of Very Low Density Residential (up to 10 dwelling units per acre). The proposed two single-family homes are permitted uses per the zoning code and would result in a density of 8.7 du/acre based on the lot size of 10,080 square feet (0.23 acre) and is therefore, consistent with density of up to 10 units per acre allowed for the Very Low Density Residential land use designation.

For the parcel at 1540 Pomeroy Avenue, the project utilizes Assembly Bill (AB) 3194 (2019), which prohibits a local agency from requiring rezoning if a proposed project is consistent with the General Plan, but the zoning for the project site is inconsistent with the General Plan. Further, a local agency may require the proposed housing development project to comply with the objective standards and criteria of the zoning code that is consistent with the General Plan; however, the standards and criteria are to be applied to facilitate and accommodate development at the density allowed on the site by the General Plan and proposed by the housing development project.

For 1540 Pomeroy Avenue, the zoning is Agricultural (A) and the General Plan land use designation is Community Mixed Use (CMU). Pursuant to AB 3194, the project will employ the objective standards of the Medium Density Multiple Dwelling (R3-36D) zoning district to construct six attached townhomes, which is a permitted use in this zoning district. The prescribed density range for Community Mixed Use designation of 20-36 du/acre would allow construction of 5-9 units on this site.

Based on the lot size of 10,920 square feet (0.25 acres) the density for the proposal to construct the six units is 24 du/acre and within the allowable density range.

The Architectural Review (PLN2019-13924) for the proposed six, three-story townhomes and two, City of Santa Clara Printed on 3/3/2022Page 1 of 3
powered by Legistar™
22-130 Agenda Date: 3/9/2022
detached two-story single-family residences was approved at the Development Review Hearing on August 18, 2021, finding the project consistent with the applicable requirements of Santa Clara City Code (SCCC) chapters 18.16 (R3-18D) and 18.20 (R3-36D). Planning Commission review, and a recommendation to the City Council, is required under (SCCC) section 17.05.300(g) for Subdivision Map applications.

DISCUSSION
Vesting Tentative Subdivision Map applications are reviewed for General Plan and Zoning Code consistency and conformance with the Subdivision Map Act. The proposed subdivision is consistent with the approved site plan, improvements, private street, surface parking, landscape open space areas, and associated utilities on the project site for the development of eight residential units with two detached single-family residences on 1530 Pomeroy Avenue and six attached townhomes. The proposed Vesting Tentative Subdivision Map was reviewed by the City’s Subdivision Clearance Committee and determined to be complete on January 11, 2022. Staff has confirmed that the proposed subdivision will not result in any inconsistencies with the General Plan and zoning designations for the property, Building Code, or other applicable requirements. Conditions of Approval have been prepared and are provided as Attachment 3. The conditions include a requirement for recordation of Covenants, Conditions and Restrictions (CC&R’s) governing the shared use and maintenance of building structures and private on-site improvements (e.g. private street, surface parking, utilities, landscaping, fencing) as well public right-off-way improvements (complete street landscaping).

ENVIRONMENTAL REVIEW
A Mitigated Negative Declaration (MND) was prepared for the project in accordance with the California Environmental Quality Act (CEQA), for the previously approved 8-unit residential development. The MND and Mitigation Monitoring and Reporting Program were approved at the Development Review Hearing on August 18, 2021, at a publicly noticed meeting. The proposed Vesting Tentative Subdivision Map is consistent with the approved project and would not result in a new impact on the environment or significantly increase the severity of any previously identified impact.

FISCAL IMPACT
There is no cost to the City other than administrative staff time and expense for the processing of this application.

COORDINATION
This report has been coordinated with the City Attorney’s Office.

PUBLIC CONTACT
On February 23, 2022, a notice of public hearing was published in The Weekly, a newspaper of general circulation, and on February 24, 2022, a notice of this item was posted in three conspicuous locations within 300 feet of the project site and mailed to property owners within 500 feet of the project site. At the time of this report, the Planning staff has not received any public comments regarding the proposed project.

Public contact was also made by posting the Commission agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 City of Santa Clara Printed on 3/3/2022Page 2 of 3
powered by Legistar™
22-130 Agenda Date: 3/9/2022
hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.

RECOMMENDATION
Adopt a resolution to recommend the City Council approve the Vesting Tentative Subdivision Map to subdivide the two residential parcels into eight condominium lots and a common parcel at the property located at 1530 and 1540 Pomeroy Avenue.

Reviewed by: Alexander Abbe, Assistant City Attorney
Approved by: Lesley Xavier, Planning Manager

ATTACHMENTS

1. Project Data Sheet

2. Resolution Recommending Council Approval of the Vesting Tentative Subdivision Map

3. Conditions of Vesting Tentative Subdivision Map Approval

4. DRH Staff Report 08.18.2021

5. Vesting Tentative Subdivision Map
City of Santa Clara Printed on 3/3/2022Page 3 of 3
powered by Legistar™
Project Data -1530 and 1540 Pomeroy Avenue- Tentative Map (PLN21-15320), March 9, 2022
Project Data
File No.(s)
Location
Applicant:

Owner:

CEQA Determination:

Project Planner:

PLN21-15320
1530 and 1540 Pomeroy Ave; two parcels with a total lot area of

0.48 acres, located on the west side of Pomeroy Avenue between El Camino Real and Granada Ave; APN: 290-02-096, 290-02-097; Property at 1530 Pomeroy is zoned Low Density Multiple Dwelling (R3-18D) and 1540 Pomeroy Avenue zoned Agricultural (A).

The Ridgecrest Group Inc./Omid Shakeri
Masud Maesumi and Valm Pascual
Adopted Mitigated Negative Declaration
Nimisha Agrawal, Associate Planner
Existing Proposed Zoning/GP Consistency
General Plan Designation
1530 Pomeroy Very Low Density
Residential
No change
1540 Pomeroy Community Mixed Use
Zoning Designation
1530 Pomeroy
Low Density Multiple
Dwelling (R3-18D)
No change Consistent with R3-18D
1540 Pomeroy Agricultural (A) No change Consistent with R3-36D Land Use Residential No change Residential
Lot Size (Sq. ft.) Total 0.48 acres (21,000 sq. ft.)
1530 Pomeroy 10,080 sq. ft. (.23
acres)
8 Condominium lot
sand one shared lot
Meets minimum lot size
requirement of 8,000 sq. ft.
1540 Pomeroy 10,920 sq. ft. (.25
acres)
Meets minimum lot size
requirement of 8,5000 sq. ft.

Building Square
Footage Total 3,412 sq. ft. Total 19,390 sq. ft.
1530 Pomeroy 1,706 sq. ft. 5,170 sq. ft. Lot coverage 28.5% (max 35%) 1540 Pomeroy 1,706 sq. ft. 14,220 sq. ft. Lot coverage 45% (max 45%) Residential Units
1530 Pomeroy 1
2 Detached Single
Family Homes
Density: 8.7 du/acre (allowed up to
10 du/acre)
1540 Pomeroy 1 6 Attached
Townhomes
Density: 24 du/acre (allowed 20-36
du/acre)
Project Data -1530 and 1540 Pomeroy Avenue- Tentative Map (PLN21-15320), March 9, 2022

Aerial Map

Project Site

Project Data -1530 and 1540 Pomeroy Avenue- Tentative Map (PLN21-15320), March 9, 2022

General Plan Map
.

Zoning Map
Community
Mixed Use
Very Low
Density
Residential
Low Density
Multiple Dwelling
Residential (R3-
18D)
Agricultural (A)
Resolution/ 1530 and 1540 Pomeroy - Vesting Tentative Subdivision Map Page 1 of 5 Rev. Rev: 11/22/17; Typed: 04/05/19

RESOLUTION NO. __________

A RESOLUTION OF THE PLANNING COMMISSION OF THE

CITY OF SANTA CLARA, CALIFORNIA RECOMMENDING THAT

THE CITY COUNCIL APPROVE A VESTING TENTATIVE
SUBDIVISION MAP (PLN21-15320) AT 1530 and 1540

POMEROY AVENUE, SANTA CLARA

BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA CLARA AS FOLLOWS:

WHEREAS, on November 15, 2021, Ridgecrest Group Inc. (“Applicant”) on behalf of Masud Maesumi and Valm Pascual (“Property Owners”) filed an application (PLN21-15320) to subdivide two existing parcels with a total lot area of 0.48 acres, located at 1530 and 1540 Pomeroy Avenue (“Project Site”) into condominium lots in accordance with the development plan (PLN2019-13924) approved for the Project Site;
WHEREAS, on August 18, 2021 , the Architectural Review (PLN2019 -13924) to construct six townhomes and two single-family homes utilizing Assembly Bill (AB) 3194 (2019) was approved at the Development Review Hearing (DRH);
WHEREAS, the application is for a Vesting Tentative Subdivision Map (PLN21 -15320) to subdivide the two residential parcels into eight condominium lots and a common parcel to serve the development;
WHEREAS, the proposed subdivision is consistent with the approved site plan and improvements on the Project Site for the development of 8 residential units in six townhomes and two single - family homes arrangement with surface parking, landscaped open space areas, and associated utilities as entitled on August 18, 2021;
WHEREAS, pursuant to Section 17.05.210 of the Code of the City of Santa Clara (“SCCC”), a Tentative Subdivision Map shall be required for all divisions of land into five or more parcels; Resolution/ 1530 and 1540 Pomeroy - Vesting Tentative Subdivision Map Page 2 of 5 Rev. Rev: 11/22/17; Typed: 04/05/19

WHEREAS, on January 11, 2022, the Subdivision Clearance Committee determined that the application was complete and that the proposed Vesting Tentative Subdivision Map should proceed to the Planning Commission in conformance with Section 17.05.300 of the SCCC; WHEREAS, SCCC Section 17.05.300(g) requir es that the Planning Commission make recommendations of denial, approval, or conditional approval to the City Council on the Tentative Subdivision Map;
WHEREAS, the proposal is to create eight condominium lots for eight residential units and one common lot to serve the development (“Project”) as shown on the proposed Vesting Tentative Subdivision Map, attached hereto and incorporated herein by this reference; WHEREAS, a Mitigated Negative Declaration (“MND”) and Mitigation Monitoring and Reporting Program were prepared in accordance with the California Environmental Quality Act and adopted at the Development Review Hearing on August 18, 2021, for the Project; WHEREAS, the proposed Vesting Tentative Subdivisi on Map is consistent with the previously approved Project and would not result in a new impact on the environment or significantly increase the severity of any previously identified impact;
WHEREAS, on February 24 , 2022, notices of the public hearing on the Vesting Tentative Subdivision Map were posted within 300 feet of the Project Site and mailed to all property owners within 500 feet of the property, according to the most recent Assessor’s roll; WHEREAS, a notice of the public hearing was published in The Weekly, a newspaper of general circulation, on February 23, 2022, for a meeting to be conducted on March 9, 2022; and WHEREAS, the Planning Commission held a duly noticed public hearing on March 9, 2022, at which time all interested persons were given an opportunity to provide testimony and the Commission considered the information presented in the Staff Report, and all verbal and written evidence.

Resolution/ 1530 and 1540 Pomeroy - Vesting Tentative Subdivision Map Page 3 of 5 Rev. Rev: 11/22/17; Typed: 04/05/19

NOW THEREFORE, BE IT FURTHER RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the Planning Commission hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. Vesting Tentative Subdivision Map Findings. Pursuant to California Government Code Sections 66426 and 66428 and SCCC Section 17.05.300(h), the Planning Commission finds and determines that:

A. The Vesting Tentative Subdivision Map is consistent with the objectives, policies, general land uses and programs specified in the City’s General Plan in that the Vesting Tentative Subdivision Map subdivides the existing 0.48 acre Project Site into eight condominium lots and one common lot to effectuate the previously approved residential development of six townhome units and two single-family homes, on-site resident and visitor parking, and common landscaped areas with shared maintenance of the building and public and private site improvements compatible with neighboring low intensity residential development and the commercial uses to the north of the project site, subject to conditions set forth in the Conditions of Vesting Tentative Subdivision Map Approval, attached hereto and incorporated by this reference.

B. The design and improvements of the proposed subdivision are consistent with the City’s General Plan in that the Vesting Tentative Subdivision Map facilitates development of a diversified housing stock and construction of ownership housing opportunities for the community; and furthermore complies with General Plan Land Use and Transitional Goals and Polices of the General Plan in that it transforms the underutilized properties from a vacant, low -intensity commercial use to a medium density residential development that would transition in scale and intensity of use with existing and planned land uses; and is in proximity to transit with multi-modal connections to local and regional transit service to support transit ridership and reduce vehicle miles traveled.

Resolution/ 1530 AND 1540 Pomeroy Avenue- Vesting Tentative Subdivision Map Page 4 of 5 Rev. Rev: 11/22/17
C. The site is physically suitable for the proposed type of development, in that the Project p rovides a transition between low intensity residential development and the existing commercial uses along the El Camino Real.

D. The site is physically suitable for the proposed density of development, in that the Project Site is in an urbanized area and is served by existing utilities and infrastructure.

E. The design of the subdivision and type of improvements are not likely to cause serious health problems, in that the proposed residential subdivision will implement Covenants Conditions and Restrictions for operation and maintenance of the building and site improvements and does not propose the use of hazardous materials.

F. The design of the subdivision and type of improvements are not likely to cause substantial environmental damage and will not substantially or unavoidably injure fish or wildlife or their habitat in that the Project Site is located in an urbanized setting, is a developed site, and the proposed subdivision includes mitigation measures, as identified in the MND and MMRP, that reduces impacts to biological resources to less-than-significant levels.

G. The design of the subdivision and type of improvements will not conflict with easements acquired by the public at large or use of property within the proposed subdivision in that it is designed to avoid encroachment and conflicts with public easements in the site design.

H. The Tentative Subdivision Map provides, to the extent feasible, for future passive or natural heating or cooling opportunities, in that it would allow flexibility in the development standards to maximize the benefits of green building standards for site and building design.

3. Based on the findings set forth in this Resolution and the evidence in the Staff Report and such other evidence as received at the public hearings on this matter before the Planning Commission, the Planning Commission hereby recommends approval of the Vesting Tentative Subdivision Map to the City Council, substantially in the form on file as shown on the attached Vesting Tentative Subdivisio n Map and Conditions of Vesting Tentative Subdivision Map Approval, hereby incorporated by this reference.

Resolution/ 1530 AND 1540 Pomeroy Avenue- Vesting Tentative Subdivision Map Page 5 of 5 Rev. Rev: 11/22/17

3. Effective date. This resolution shall become effective immediately.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE PLANNING COMMISSION OF THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 9TH DAY OF MARCH 2022, BY THE FOLLOWING VOTE:

AYES: COMMISSIONERS:

NOES: COMMISSIONERS:

ABSENT: COMMISSIONERS:

ABSTAINED: COMMISSIONERS:

ATTEST:

ANDREW CRABTREE

DIRECTOR OF COMMUNITY DEVELOPMENT

CITY OF SANTA CLARA

Attachments Incorporated by Reference:

1. Vesting Tentative Subdivision Map

2. Conditions of Vesting Tentative Subdivision Map Approval

________________________________________________________________________________

Page 1 of 6 ends

PLN21-15320, March 9, 2022

CONDITIONS OF APPROVAL
In addition to complying with all applicable codes, regulations, ordinances and resolutions, the following conditions of approval are recommended:

GENERAL
A. If relocation of an existing public facility becomes necessary due to a conflict with the developer' s new improvements, then the cost of said relocation shall be borne by the developer.

B. Comply with all applicable codes, regulations, ordinances and resolutions.

ATTORNEY’S OFFICE
A. The Developer agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorneys' fees, injuries, costs, and liabilities arising from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of developer's project.

COMMUNITY DEVELOPMENT

BUILDING DIVISION
BD1. Informational: Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer.

The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review. Please note city staff policy that existing site addresses typically are retired. Provide digital pdf printed from design software, not scanned from printed paper sheet.

BD2. Informational: The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map: https://msc.fema.gov/portal/home
. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code.

BD3. Informational: The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-w2k.com/nd_wp.shtml . All projects that disturb more
than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP):
http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD). All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page:
https://www.santaclaraca.gov/our-city/departments-g-z/public-works/environmental- programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.

BD4. Informational: no California construction code review is being done at this time. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis, including; proposed use and occupancy of all spaces (19' CBC Ch. 3), all building heights and areas (19' CBC Ch. 5), all proposed types of construction (19' CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (19' CBC Ch. 7), all proposed interior finishes fire resistance (19' CBC Ch. 8), all fire protection systems proposed (19' CBC Ch. 9), and all means of egress proposed (19' CBC Ch. 10). -Noncombustible exterior wall, floor, and roof finishes are strongly encouraged. ________________________________________________________________________________ Conditions of Approval- 1530 and 1540 Pomeroy Avenue- Tentative Map Page 2 of 6 March 9, 2022
• During construction retaining a single company to install all fire rated penetrations is highly recommended.
• The grade level lobbies shall be min.1 hour rated all sides and above. • All stair shafts shall be min. 1 hour rated.
• All elevator shafts shall be min. 1 hour rated.
• All trash chute shafts shall be min. 1 hour rated.
• Recommendation: provide a minimum of two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room. • Any trash rooms shall be min. 1 hour rated all sides and above.

BD5. Informational: The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-site grading permit shall be a separate permit application to the Building Division.

BD6. Informational: Temporary Certificates of Occupancy will not be routinely issued, and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, P.W./ Engineering, Fire Prev., Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.

HOUSING & COMMUNITY SERVICES DIVISION
H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the following affordable housing requirements and impact fee:

The requirement for the for-sale residential development which applies to the proposed 8 units is as follows:
(a) Unless the City Council approves an alternate method of compliance pursuant to section (b) below, the Applicant shall provide one dwelling unit affordable to households at 100% AMI or pay an in-lieu fee. The in-lieu fee shall be equal to the difference between the unrestricted appraised market value ("Initial Market Value") and the Affordable Sales Price of the last unit at completion. The Initial Market Value of the last unit sold shall be the basis for calculating the in-lieu fee to be paid by Applicant. Any in-lieu fee payment due to the City by the Applicant shall be paid prior to receipt of the occupancy certificate of the last unit at completion.

The Affordable Unit shall have prices set in accordance with the City’s Below Market Purchase (BMP) Program Policies and Procedures Manual (subject to updates and changes). Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement with the City that will determine the Affordable Sales Price, identify the actual unit to be sold as the Affordable Unit, and apply all terms and covenants guaranteeing the prescribed affordability, to the satisfaction of the Director of Community Development. There is a fee for the AHA preparation in the amount of $3,708 which will be due prior to execution of the AHA.
(b) In the alternative, the City Council may, in its sole discretion, authorize the Applicant to utilize an alternate means of compliance pursuant to SCCC § 17.40.080(g) through the execution of a development agreement. In order to utilize such an alternative, such Development Agreement must be fully executed prior to issuance of Building Permits. If no Development Agreement has been executed at the time Building Permits are issued, then section (a) above shall apply.

PLANNING DIVISION
P1. The project shall comply with the Conditions of Architectural Review approvals (PLN2019-13924) and the mitigation measures identified in the Mitigated Negative Declaration and adopted Mitigation Monitoring and Reporting Program for the project.
________________________________________________________________________________ Conditions of Approval- 1530 and 1540 Pomeroy Avenue- Tentative Map Page 3 of 6 March 9, 2022
P2. Developer shall prepare and submit Covenant, Conditions and Restrictions (CC&R$s) to the City for review and approval. The approved CC&Rs are to be recorded prior to the issuance of building permits and a copy is provided to the Planning Department.

PUBLIC WORKS

ENGINEERING
E1. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be identified for compliance during the site clearance process. Contact Public Works Department at (408) 615-3000 for further information.

E2. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be included within a Single Encroachment Permit issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E3. Submit public improvement plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of parcel map and/or issuance of building permits.

E4. Existing non-standard or non-ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E5. Dedicate, as required, on-site easements for new and existing utilities and sidewalk by Subdivision Map or approved instrument at time of development. Developer shall pay applicable easement preparation/processing fee.

E6. Dedicate a sidewalk easement for the sidewalk and driveway portions within private property and pay the easement preparation fee. Sidewalk easement shall be 1’ behind proposed back-of-walk if there is landscaping behind sidewalk and/or at the proposed back-of-walk with a cold joint if there is hardscape concrete behind sidewalk.

E7. After City Council approval of the Tentative Map, submit 10 copies of the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.

STREETS DIVISION
Landscape
L1. Include City of Santa Clara Tree Preservation/City Arborist specifications on all improvement plans.

L2. No cutting of any part of private trees, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).

L3. Identified existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City of Santa Clara prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.

Stormwater
ST1. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form
, and an Erosion and Sediment Control Plan.

ST2. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter shall be submitted with the Plan.

ST3. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans in accordance with the City’s Urban Runoff Pollution Prevention Program standards prior to the issuance of Building or Grading Permits. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans. ________________________________________________________________________________ Conditions of Approval- 1530 and 1540 Pomeroy Avenue- Tentative Map Page 4 of 6 March 9, 2022
ST4. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.

ST5. During the construction phase, all stormwater control measures shall be inspected for conformance to approved plans by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party concurrence letter on the C.3 facilities construction shall be submitted to the Public Works Department. As-Built drawing shall be submitted to the Public Works Department. Include C.3 Stormwater Treatment Facilities Construction general notes on the improvement plans.

ST6. Permeable Pavement shall be inspected by a third-party reviewer and/or manufacturer representative for conformance with the details and specifications. If necessary, percolation test shall be performed to ensure proper installation. The number, location and species of the interceptor trees shall be confirmed during the construction.

ST7. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C). They shall be installed using biotreatment soil media that meet the minimum specifications as set forth in this Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix.

ST8. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures in perpetuity. Applicants should contact Karin Hickey at (408) 615-3097 or [email protected]
for assistance completing the Agreement. For more
information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at
http://santaclaraca.gov/stormwater. For porous pavement, inspection of these facilities is to be done annually.

ST9. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.

ST10. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.

ST11. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST12. Final C.3 inspection by Code Enforcement staff shall be completed after receipt of the 3 rd party
concurrence letter and installation of stormwater treatment facilities, planting materials and storm drain medallions.

WATER & SEWER
W1. Previous Approvals: Permittee shall abide by and continue to comply with all previous City approvals, permits, or requirements relating to the subject property, unless explicitly superseded or revised by the Director of Water and Sewer Utilities.

W2. Utility Design: The utility design plans shall reflect the following revisions to the utility design:
a. All potable water services including fire hydrant services shall connect to the existing 10” CIP on Pomeroy Avenue and not the existing 8” CIP main.
b. Locate all water meters and appurtenances in the landscaping strip adjacent to the curb or immediately adjacent to the back of the sidewalk per City Standard Details.

W3. Encroachment Permit: Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.

W4. Utility Design Plans: Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details. ________________________________________________________________________________ Conditions of Approval- 1530 and 1540 Pomeroy Avenue- Tentative Map Page 5 of 6 March 9, 2022
Note that all new water meters and backflow prevention devices shall be located behind the sidewalk in a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.

W5. Utility Separations: Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services: 10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water services, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.

W6. Separate Services: Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right-of-way to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.

W7. City Standard Meters and Backflows: All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.

W8. Existing Services: The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.

W9. On-Site Storm Drain Treatment: Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system. The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system.

W10. Water Usage: Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).

W11. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities. Decorative water features may be permanently connected to the City’s recycled water supply.

W12. Easements: Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite. The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-of-way without overlapping any public utility easement.

Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities. ________________________________________________________________________________ Conditions of Approval- 1530 and 1540 Pomeroy Avenue- Tentative Map Page 6 of 6 March 9, 2022
W13. Underground Fire Permit: Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408)615-2000.

A dedicated fire service line, with an approved backflow prevention device, shall be used for on-site fire hydrants. Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.

W14. Record Drawings: Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as-built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the Director of Water & Sewer Utilities Department.

W15. Water Shortage Response Actions: Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.

Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control.
b. restrict the use of potable water used for construction and dust control if recycled water is available.

This project is subject to all the requirements and restrictions of the Water Shortage Response Actions in place or adopted during the duration of the project. For more information, visit the City of Santa Clara Water & Sewer Utilities website at www.santaclaraca.gov/waterconservation .

City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
21-997 Agenda Date: 8/18/2021

REPORT TO DEVELOPMENT REVIEW HEARING

SUBJECT
Adoption of a Mitigated Negative Declaration (MND) and Mitigation Monitoring or Reporting Program (MMRP) and action on AB 3194 proposal for the proposed six three-story townhomes and two detached, two-story single-family homes at 1530 and 1540 Pomeroy Avenue
File No.(s): PLN2019-13924
Location: 1530 and 1540 Pomeroy Ave; two parcels with a total lot area of .048 acres, located on the west side of Pomeroy Avenue between El Camino Real and Granada Ave; APN: 290-02-096, 290-02-097; Property at 1530 Pomeroy is zoned Low Density Multiple Dwelling (R3-18D) and 1540 Pomeroy Avenue zoned Agricultural (A).

Applicant: The Ridgecrest Group Inc./Omid Shakeri
Owner: Masud Maesumi and Valm Pascual
Request: Architectural Review utilizing AB 3194 to construct six three-story townhomes and two detached, two -story single-family homes on two contiguous residential lots with a total lot area of 0.48 acres with 19 parking spaces. The project involves demolition of two existing one-story single family homes at 1530 and 1540 Pomeroy Avenue.

Project Data: See Attachment 1.

Points for consideration
Summary
· The applicant proposes to redevelop the two contiguous lots with a total area of 0.48 acre with two independent projects as following:
o 1530 Pomeroy Ave (.23 acres): Construct two detached Single Family homes. o 1540 Pomeroy Ave (.25 acres): Construct six attached townhomes · The project would utilize Assembly Bill (AB) 3194 (2018), which prohibits a local agency from requiring a rezoning if a proposed project is consistent with the general plan but the zoning for the project site is inconsistent with the general plan. Further, a local agency may require the proposed housing development project to comply with the objective standards and criteria of the zoning designation which is consistent with the general plan; however, the standards and criteria are to be applied to facilitate and accommodate development at the density allowed on the site by the general plan and proposed by the proposed housing development project.
· AB 3194 is applicable to the parcel at 1540 Pomeroy Avenue, which is zoned Agricultural (A) and has a General Plan Designation of Community Mixed Use (CMU). Pursuant to AB 3194, the project proposes to employ the objective standards of the Medium Density Multiple Dwelling (R3-36D) zoning district to construct six attached townhomes, which is a permitted use in this zoning district. The prescribed density range for Community Mixed Use designation of 20-36 du/acre would allow construction of 5-9 units on this site. Based on the lot size of 10,920 square feet (.25 acres) the density for the proposal to construct the six units is 24 du/acre and within the allowable density range. · The parcel at 1530 Pomeroy Avenue is zoned Low Density Multiple Dwelling (R3-18D) and a General Plan designation of Very Low Density Residential. The proposed two single-family homes are permitted uses per the zoning code and result in a density of 8.7 du/acre based on the lot size of 10,080 square feet (.23 acre) and is therefore, consistent with density of up to 10 units per acre allowed for the Very Low Density Residential designation.

City of Santa Clara Printed on 8/11/2021Page 1 of 5
powered by Legistar™
21-997 Agenda Date: 8/18/2021
· A condominium map would be processed to consolidate and subdivide the land into private residential lots and common space for the driveway, open space, and guest parking areas and will be filed following the DRH meeting action.
· A Community outreach meeting for the project is scheduled for Thursday August 12, 2021.

Building Design
· The project would construct two detached single family homes on the southern parcel (1530 Pomeroy) that borders single family homes to the west and to the south. Each home would be 2,165 square feet with four bedrooms and three bathrooms and a 400 square foot attached garage. · The parcel on the north (1540 Pomeroy) that borders commercial uses to the north and the west, would be occupied with six three-story attached townhomes. Each townhome would be 1,970 square feet with three bedrooms and two bathrooms and a 400 square foot attached garage. · The two single family homes at 1530 Pomeroy adhere to the setback, lot coverage and all other zoning regulations of the Low Density Multiple Dwelling (R3-18D) Zoning District. The six Townhomes at 1540 Pomeroy adhere to the to the setback, lot coverage and all other zoning regulations of the Medium Density Multiple Dwelling (R3-36D) Zoning District, which is the zoning district that is consistent with the CMU General Plan designation.
· The townhomes have been designed with a contemporary American colonial architecture featuring horizontal siding on the first and the second levels, interspersed on the second level with wood shingle- covered bays. The third level would be sided with wood shingles and punctuated with gable bays that continue the horizontal wood siding from the lower levels. Fenestration would include a mix of divided- light vertical and square windows. The townhomes would be a single building with hipped roof and a long central ridge. The architecture of the single family homes would be the same as that of the townhomes but in a two story format.
· The private garages would be accessed through a shared 20 feet wide driveway. · It should be noted that only objective design and zoning standards can be applied to projects utilizing AB 3194 (here, the parcel at 1540 Pomeroy).

Open Space
The project provides an open space to the rear and south of the project site. A landscape plan has not been developed yet, but the applicant has indicated the site would be developed with drought tolerant and water efficient landscaping. The property frontage would be planted with new street trees in accordance with the City requirements. All units will have a private patio.

Parking
A 400 square foot attached garage is incorporated in the ground floor of each residential unit, exceeding the requirement of one covered and one uncovered parking spaces for zoning districts R3-18D and R3-36D. In addition, three guest parking spaces have been provided on the single family project site at 1530 Pomeroy.

Findings supporting the Staff Recommendation

1. That any off-street parking area, screening strips and other facilitates and improvements necessary to secure the purpose and intent of this title and the general plan of the City area a part of the proposed development, in that;
· The development provides a total of 19 on-site parking spaces (16 covered, 3 uncovered), exceeding the requirement of eight covered and eight uncovered spaces and provides adequate circulation for vehicular access in accordance with Chapter 18.74 Parking regulations.

2. That the design and location of the proposed development and its relation to neighboring developments and traffic is such that it will not impair the desirability of investment or occupation in the neighborhood, will not unreasonably interfere with the use and enjoyment of neighboring developments, and will not create traffic congestion or hazard, in that; City of Santa Clara Printed on 8/11/2021Page 2 of 5
powered by Legistar™
21-997 Agenda Date: 8/18/2021
· The proposed project would not generate an increase in trips previously anticipated with the analysis undertaken as part of the land use study in the 2010-2035 General Plan and further analyzed and determined to be less than significant in the Mitigated Negative Declaration prepared for this project. · On balance, the project is consistent with the City’s General Plan as discussed below.

TABLE 1: PROJECT CONSISTENCY WITH SANTA CLARA GENERAL PLAN LAND USE

POLICIES
Land Use Policies Project Consistency

5.3.1-P2: Encourage advance notification and
neighborhood meetings to provide an opportunity
for early community review of new development
proposals.

The project included a community meeting
and posted Notice of Development
Proposal on the project site.

5.3.1-P3: Support high quality design consistent
with adopted design guidelines and the City’s
architectural review process.

The project includes a variety of materials
and design techniques when combined
makes the project aesthetically compatible
with the vision of the area.

5.3.1 ‐
P4: Encourage new development that
meets the minimum intensities and densities
specified in the land use classifications or as
defined through applicable Focus Area,
Neighborhood Compatibility or Historic
Preservation policies of the General Plan.

The project’s density is within the minimum
and maximum range indicated in the
General Plan. The parcel at 1530 Pomeroy
is approximately .23 acre and would house
2 single family homes at a density of 8.7
du/acre that is consistent with the density
for the Very Low Density General Plan
designation (up to 10 du/acre). The parcel
at 1540 Pomeroy is approximately .25 acre
and would develop six units at a density of
24 du/acre consistent with the density
range of the Community Mixed Use
designation (20-36 du/acre).

5.3.1 ‐
P9: Require that new development provide
adequate public services and facilities,
infrastructure, and amenities to serve the new
employment or residential growth.

The project will be required to upgrade
infrastructure facilities in accordance with
the City’s policies.

5.3.1 ‐
P10: Provide opportunities for increased
landscaping and trees in the community,
including requirements for new development to
provide street trees and a minimum 2:1 on
‐
or off
site replacement for trees removed as part of the
proposal to help increase the urban forest and
minimize the heat island effect.

Project would remove the existing
vegetation and develop a landscape plan
consistent with the City’s tree replacement
policy. Site would be developed with
drought tolerant and water efficient
landscaping. The site frontage would be
planted with new street trees in accordance
with the City Requirements.

5.3.1 ‐
P12: Encourage convenient pedestrian
connections within new and existing
developments.

The project would include 5’ wide sidewalk
with 4.5’ wide planter strip along the
property frontage connecting to existing
developments.

5.3.1 ‐
P29 Encourage design of new
development to be compatible with, and sensitive
to, nearby existing and planned development,
consistent with other applicable General Plan
policies.

The project would construct six 3 story
townhomes oriented towards the adjacent
commercial uses and two 2-story single
family homes oriented towards the adjacent
single family homes.

5.3.2 ‐
P8: Require new residential development
to comply with applicable regulations for the
provision of affordable housing.

The project will be required to provide one
affordable dwelling unit or pay an in-lieu
fee.

5.5.2 ‐
P1 Require that new development
incorporate building articulation and architectural
features, including front doors, windows, stoops,
porches or bay windows along street frontages,
to integrate new development into existing
neighborhoods.

The buildings’ orientation and architectural
features have been employed in the project
to integrate and promote compatibility with
the existing neighborhood.

City of Santa Clara Printed on 8/11/2021Page 3 of 5
powered by Legistar™
21-997 Agenda Date: 8/18/2021
TABLE 1: PROJECT CONSISTENCY WITH SANTA CLARA GENERAL PLAN LAND USE

POLICIES
Land Use Policies Project Consistency

5.3.1-P2: Encourage advance notification and
neighborhood meetings to provide an opportunity
for early community review of new development
proposals.

The project included a community meeting
and posted Notice of Development
Proposal on the project site.

5.3.1-P3: Support high quality design consistent
with adopted design guidelines and the City’s
architectural review process.

The project includes a variety of materials
and design techniques when combined
makes the project aesthetically compatible
with the vision of the area.

5.3.1 ‐
P4: Encourage new development that
meets the minimum intensities and densities
specified in the land use classifications or as
defined through applicable Focus Area,
Neighborhood Compatibility or Historic
Preservation policies of the General Plan.

The project’s density is within the minimum
and maximum range indicated in the
General Plan. The parcel at 1530 Pomeroy
is approximately .23 acre and would house
2 single family homes at a density of 8.7
du/acre that is consistent with the density
for the Very Low Density General Plan
designation (up to 10 du/acre). The parcel
at 1540 Pomeroy is approximately .25 acre
and would develop six units at a density of
24 du/acre consistent with the density
range of the Community Mixed Use
designation (20-36 du/acre).

5.3.1 ‐
P9: Require that new development provide
adequate public services and facilities,
infrastructure, and amenities to serve the new
employment or residential growth.

The project will be required to upgrade
infrastructure facilities in accordance with
the City’s policies.

5.3.1 ‐
P10: Provide opportunities for increased
landscaping and trees in the community,
including requirements for new development to
provide street trees and a minimum 2:1 on
‐
or off
site replacement for trees removed as part of the
proposal to help increase the urban forest and
minimize the heat island effect.

Project would remove the existing
vegetation and develop a landscape plan
consistent with the City’s tree replacement
policy. Site would be developed with
drought tolerant and water efficient
landscaping. The site frontage would be
planted with new street trees in accordance
with the City Requirements.

5.3.1 ‐
P12: Encourage convenient pedestrian
connections within new and existing
developments.

The project would include 5’ wide sidewalk
with 4.5’ wide planter strip along the
property frontage connecting to existing
developments.

5.3.1 ‐
P29 Encourage design of new
development to be compatible with, and sensitive
to, nearby existing and planned development,
consistent with other applicable General Plan
policies.

The project would construct six 3 story
townhomes oriented towards the adjacent
commercial uses and two 2-story single
family homes oriented towards the adjacent
single family homes.

5.3.2 ‐
P8: Require new residential development
to comply with applicable regulations for the
provision of affordable housing.

The project will be required to provide one
affordable dwelling unit or pay an in-lieu
fee.

5.5.2 ‐
P1 Require that new development
incorporate building articulation and architectural
features, including front doors, windows, stoops,
porches or bay windows along street frontages,
to integrate new development into existing
neighborhoods.

The buildings’ orientation and architectural
features have been employed in the project
to integrate and promote compatibility with
the existing neighborhood.

3. That the design and location of the proposed development is such that it is in keeping with the character of the neighborhood and is such as not to be detrimental to the harmonious development contemplated by this title and the general plan of the City, in that:
· The development is a two to three story medium density residential structure that is compatible with the existing residential uses in the area.
· The two single family homes at 1530 Pomeroy adhere to the setback, lot coverage and all other zoning regulations of the Low Density Multiple Dwelling (R3-18D) Zoning District. · The six Townhomes at 1540 Pomeroy adhere to the to the setback, lot coverage and all other zoning regulations of the Medium Density Multiple Dwelling (R3-36D) Zoning District. Therefore, the project is consistent with this finding.

4. That the granting of such approval will not, under the circumstances of the particular case, materially affect adversely the health, comfort or general welfare of persons residing or working in the neighborhood of said development, and will not be materially detrimental to the public welfare or injuries to property or improvements in said neighborhood, in that:
· The project is subject to the California Building Code and City Code requirements, which serve to regulate new construction to protect public health safety and general welfare. · The use, scale, and design of the development, as conditioned, are consistent with the General Plan density contemplated for this area, and is therefore compatible with the existing and future land uses in the surrounding area.

5. That the proposed development, as set forth in the plans and drawings, are consistent with the set of more detailed policies and criteria for architectural review as approved and updated from time to time by the City Council, which set shall be maintained in the planning division office, in that:
· The proposed development provides for an attractive, inviting, imaginative and functional site arrangement of the building, the obscured parking areas, and a high quality architectural and landscape design. The development also complies with the objective zoning standards applicable to each parcel as permitted under AB 3194.

ENVIRONMENTAL REVIEW
A Mitigated Negative Declaration (MND) has been prepared for the project in accordance with the California Environmental Quality Act (CEQA). The MND and Notice of Availability were posted on the City’s website here <https://www.santaclaraca.gov/Home/Components/BusinessDirectory/BusinessDirectory/405/3649> and circulated for 20-day review on June 9, 2021 and closed on July 1, 2021, in accordance with CEQA City of Santa Clara Printed on 8/11/2021Page 4 of 5
powered by Legistar™
21-997 Agenda Date: 8/18/2021
requirements. No public comments were received.

An errata has been prepared and posted on the City’s websitehere <https://www.santaclaraca.gov/Home/Components/BusinessDirectory/BusinessDirectory/405/3649> to accurately describe the consistency of the project with density requirements in the General Plan.

FISCAL IMPACT
There is no impact to the City for processing the requested application other than administrative staff time and expense typically covered by processing fees paid by the applicant.

PUBLIC CONTACT
On August 5, 2021, a notice of public hearing of this item was posted within 300 feet of the project site and mailed to property owners within 500 feet of the project site. Planning Staff has received one public comments for this application and has been included with this report as Attachment 3.

RECOMMENDATION
Adopt the MND and MMRP for this project and Approve the architectural review of the proposed six three- story townhomes and two detached, two-story single-family homes at 1530 and 1540 Pomeroy Avenue per AB 3194, subject to conditions.

Prepared by: Nimisha Agrawal, Associate Planner, Community Development Department Approved by: Gloria Sciara, Development Review Officer, Community Development Department

ATTACHMENTS

1. Project Data

2. Conditions of Approval

3. Development Plans

4. Public Comments
City of Santa Clara Printed on 8/11/2021Page 5 of 5
powered by Legistar™
Project Data -1530 and 1540 Pomeroy
Project Data

Existing Proposed Zoning/GP Consistency
General Plan Designation
1530 Pomeroy Very Low Density
Residential
No change
1540 Pomeroy Community Mixed Use
Zoning Designation
1530 Pomeroy
Low Density Multiple
Dwelling (R3-18D)

No change Consistent with R3-18D

1540 Pomeroy Agricultural (A) No change Consistent with R3-36D Land Use Residential No change Residential
Lot Size (Sq. ft.) Total 0.48 acres (21,000 sq. ft.)
1530 Pomeroy 10,080 sq. ft. (.23
acres)
No change Meets minimum lot size
requirement of 8,000 sq. ft.

1540 Pomeroy 10,920 sq. ft. (.25
acres)
No change Meets minimum lot size
requirement of 8,5000 sq. ft.

Building Square
Footage Total 3,412 sq. ft. Total 19,390 sq. ft.
1530 Pomeroy 1,706 sq. ft. 5,170 sq. ft. Lot coverage 28.5% (max 35%) 1540 Pomeroy 1,706 sq. ft. 14,220 sq. ft. Lot coverage 45% (max 45%) Residential Units
1530 Pomeroy 1
2 Detached Single
Family Homes
Density: 8.7 du/acre (allowed up to
10 du/acre)

1540 Pomeroy 1 6 Attached
Townhomes
Density: 24 du/acre (allowed 20-36
du/acre)
Height
1530 Pomeroy 1-story building 24’-8” Consistent with R318D; max allowed 25’
1540 Pomeroy 1-story building 36’-6” Consistent with R3-36D; max allowed 45’
Open Spaces
1530 Pomeroy - 4,130 sq. ft. (41%) Consistent with R318D; max required 40%
1540 Pomeroy - 4,370 sq. ft. (40%) Consistent with R3-36D; max required 40%
Parking

1530 Pomeroy Surface parking 7 Exceeds the requirement for 4 covered parking
1540 Pomeroy Surface parking 12 Exceeds the requirement for 6 covered and 6 uncovered parking
Flood Zone X No Change
________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924

CONDITIONS OF APPROVAL
In addition to complying with all applicable codes, regulations, ordinances and resolutions, the following conditions of approval are recommended:

GENERAL
A. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.

B. Comply with all applicable codes, regulations, ordinances and resolutions.

ATTORNEY’S OFFICE
A. The Developer agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorneys' fees, injuries, costs, and liabilities arising from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of developer's project.

COMMUNITY DEVELOPMENT

BUILDING DIVISION
BD1. Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy for Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review. Please note city staff policy that existing site addresses typically are retired. Provide digital pdf printed from design software, not scanned from printed paper sheet.

BD2. The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map:
https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code.

BD3. The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-w2k.com/nd_wp.shtml. All projects that disturb more than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP): http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD). All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page:
https://www.santaclaraca.gov/our-city/departments-g-z/public-works/environmental- programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.

BD4. Informational: no California construction code review is being done at this time. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis, including; proposed use and occupancy of all spaces (19' CBC Ch. 3), all building heights and areas (19' CBC Ch. 5), all proposed types of construction (19' CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (19' CBC Ch. 7), all proposed interior finishes fire resistance (19' CBC Ch. 8), all fire protection systems proposed (19' CBC Ch. 9), and all means of egress proposed (19' CBC Ch. 10). -Noncombustible exterior wall, floor, and roof finishes are strongly encouraged.

BD5. During construction retaining a single company to install all fire rated penetrations is highly recommended.
________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
BD6. The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-site grading permit shall be a separate permit application to the Building Division.

BD7. The construction permit application drawings submitted to the Santa Clara Building Division shall include all accessibility requirements of the 19' CBC Ch. 11 as applicable.

BD8. The construction permit application drawings submitted to the Santa Clara Building Division shall include checklist(s) indicating compliance with the applicable Mandatory Measures of the 19' Cal.

Green Building Standards Code (CGBSC). Provide Construction Waste Management (CWM) Plan per the 19' CGBSC guides on pp 59-63 of the CGBSC. Provide a Phase 1 and/ or Phase 2 Hazardous Materials site assessment, as applicable. Note: The Santa Clara Public Works Department Environmental Programs Division will require compliance with the Santa Clara Construction & Demolition Debris Recycling Program: http://santaclaraca.gov/government/departments/public- works/environmental-programs/commercial-garbage-recycling/construction-demolition-debris-recycling- program. Note: the Environmental Programs Division may require development projects to register with the Green Halo online waste tracking system: https://www.greenhalosystems.com.

BD9. Note: Temporary Certificates of Occupancy will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, P.W./ Engineering, Fire Prev., Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.

HOUSING & COMMUNITY SERVICES DIVISION
H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the following affordable housing requirements and impact fee:

The requirement for the for-sale residential development which applies to the proposed 8 units is as follows:

The Applicant shall provide one dwelling unit affordable to households at 100%AMI or pay an in-lieu fee. The in-lieu fee shall be equal to the difference between the unrestricted appraised market value ("Initial Market Value") and the Affordable Sales Price of the last unit at completion. The Initial Market Value of the last unit sold shall be the basis for calculating the in-lieu fee to be paid by Applicant. Any in-lieu fee payment due to the City by the Applicant shall be paid prior to receipt of the occupancy certificate of the last unit at completion.

Affordable Unit shall have prices set in accordance with the City’s Below Market Purchase (BMP) Program Policies and Procedures Manual (subject to updates and changes). Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement with the City that will determine the Affordable Sales Price, identify the actual unit to be sold as the Affordable Unit, and apply all terms and covenants guaranteeing the prescribed affordability, to the satisfaction of the Director of Community Development. There is a fee for the AHA preparation in the amount of $3,708 which will be due prior to execution of the AHA.

PLANNING DIVISION
P.1 Submit plans for final architectural review to the Planning Division and obtain architectural approval prior to issuance of building permits. Said plans to include, but not be limited to site plans, floor plans, elevations, landscaping, lighting and signage. Landscaping installation shall meet City water conservation criteria in a manner acceptable to the Director of Community Development.

P.2 Obtain required permits and inspections from the Building Official and comply with the conditions thereof. If this project involves land area of 1 acre or more, the developer shall file a Notice of Intent (NOI) with the State Water Resources Control Board prior to issuance of any building permit for ________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
grading, or construction; a copy of the NOI shall be sent to the City Building Inspection Division. A storm water pollution prevention plan is also required with the NOI.

P.3 Comply with all requirements of Building and associated codes (the CBC. CEC, CMC, CPC, California Green Building Code, the California Energy Code, etc.) current at the time of application for Building Permit, that includes grading and site utility permits.

P.4 The Developer shall comply with the Mitigations Monitoring and Reporting Program identified in the Initial Study / Mitigated Negative Declaration and shall be incorporated in the Conditions of Approval for this project.

P.5 A change in the original number of unit and any subsequent division or increase in the number of units shall require a discretionary development permit.

P.6 Prior to issuance of a demolition permit, Developer/Owner shall have an asbestos survey of the proposed site performed by a certified individual. Survey results and notice of the proposed demolition are to be sent to the Bay Area Air Quality Management District (BAAQMD). No demolition shall be performed without a demolition permit and BAAQMD approval and, if necessary, proper asbestos removal.

P.7 Incorporate Best Management Practices (BMPs) into construction plans and incorporate post construction water runoff measures into project plans in accordance with the City’s Urban Runoff Pollution Prevention Program standards prior to the issuance of permits. Proposed BMPs shall be submitted to and thereafter reviewed and approved by the Planning Division and the Building Inspection Division for incorporation into construction drawings and specifications.

P.8 An erosion control plan shall be prepared, and copies provided to the Planning Division and to the Building Inspection Division for review and approval prior to the issuance of grading permits or building permits that involve substantial disturbance of substantial ground area.

P.9 Commercial, industrial, and multi-family residential buildings must have enclosures for solid waste and recycling containers. The size and shape of the enclosure(s) must be adequate to serve the estimated solid waste and recycling needs and size of the building(s) onsite and should be designed and located on the property so as to allow ease of access by collection vehicles. As a general rule, the size of the enclosure(s) for the recycling containers should be similar to the size of the trash enclosure(s) provided onsite. Roofed enclosures with masonry walls and solid metal gates are the preferred design. Any required enclosure fencing (trash area, utility equipment, etc.) if not see-thru, shall have a six (6) inch opening along the bottom for clear visibility. Any gates or access doors to these enclosures shall be locked.

P.10 The Final Storm Water Management Plan (SWMP) must be certified by a third-party consultant from SCVURPP’s current list of qualified consultants. Five copies of the approval letter from the certified third party review (wet stamped and signed) must be submitted prior to the issuance of grading or building permit.

P.11 Prior to the issuance final occupancy, the applicant shall enter into Operations and Maintenance (O&M) agreement with the City. The project operator is responsible for the operations and maintenance of the SWMP and stormwater BMPs consistent with the O&M agreement throughout the life of the project.

P.12 A complete landscape plan that includes, type, size and location of all plant species shall be required as part of architectural review of the project. Review and approval of the complete landscape plan, including water conservation calculations and irrigation plan shall be required prior to issuance of building permits. Installation of landscaping is required prior to occupancy permits.

P.13 Site landscaping shall be maintained in good condition throughout the life of the Development and no trees shall be removed without City review and approval.

P.14 Trees permitted by the City for removal shall be replaced at a 2:1 ratio with 24-inch box specimen trees reviewed, or equal alternative as approved by the Director of Community Development.

P.15 The project shall provide complete streets along the project frontage on Pomeroy Avenue at least 5 foot wide detached sidewalk with a 4.5 foot landscape strip.

P.16 Construct six-foot masonry wall along property lines abutting commercial and residential properties in accordance with Zoning Ordinance requirements or to the satisfaction of the Director of Community Development.
________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
P.17 Developer is responsible for collection and pick-up of all trash and debris on-site and adjacent public right-of-way.

P.18 Minor changes to the project would be subject to Planning Division review and approval prior to issuance of building permits.

P.19 Construction activity not confined within a building shall be limited to the hours of 7:00 a.m. to 6:00 p.m. weekdays and not permitted on Saturdays and Sundays for projects within 300 feet of a residential use.

Construction activity confined within a building shall be limited to the hours of 7:00 A.M. to 6:00 P.M. following on weekdays other than holidays, Monday through Friday, inclusive; and within the hours of 9:00 A.M. to 6:00 P.M. following, inclusive, on any Saturday which is not a holiday. Construction activity shall not be allowed on recognized State holidays, as noted in Section 9.10.230 of the SCCC, as amended.

FIRE
F1. The Fire Department’s review was limited to verifying compliance per the 2016 California Fire Code (CFC), Section 503 (Fire Apparatus Access Roads), Section 507 (Fire Protection Water Supplies), Appendix B (Fire-Flow Requirements for Buildings) and Appendix C (Fire Hydrant Locations and Distribution) and City of Santa Clara Requirements.

F2. (For buildings other than one-and two-family dwellings, Group R-3 and R-4 buildings and townhomes):

At time of Building Permit application provide documentation to show the minimum required fire-flow for the building based on the construction type and square footage in accordance with the California Fire Code, Appendix B, Table B105.1 can be met. A 75% reduction in fire-flow is allowed with the installation of a automatic fire sprinkler system designed in accordance with California Fire Code § B105.2. The resulting fire-flow shall not be less than 1,500 gallons per minute (or 1,000 gallons per minute for NFPA 13 fire sprinkler systems) minute for the prescribed duration.

F3. (Required fire flow for one- and two-family dwellings, Group R-3 and R-4 buildings and townhomes): At time of Building Permit application, provide documentation to show the minimum required fire-flow for the building based on the construction type and square footage in accordance with the California Fire Code, Appendix B, Table B105.1 can be met. A 75% reduction in fire-flow is allowed with the installation of a automatic fire sprinkler systems designed in accordance with California Fire Code § B105.1(1).

F4. At time of Building Permit application, the required number, location and distribution of fire hydrants for the building based on the California Fire Code, Appendix C, Table C102.1 shall be incorporated into the construction documents. The required number of fire hydrants shall be based on the fire-flow before the reduction.

F5. At time of Building Permit application, construction documents for proposed fire apparatus access, location of fire lanes and construction documents and hydraulic calculations for fire hydrant systems shall be submitted to the Fire Prevention and Hazardous Materials Division.

F6. Prior to the start of construction, fire protection water supplies shall be installed and made serviceable prior to the time of construction or prior to combustible materials being moved onsite, unless an approved alternative method of protection is approved by the Fire Prevention and Hazardous Materials Division.

PARKS & RECREATION
PR1. The City will accept a fee in lieu of parkland dedication for this eight-unit development – the equivalent fee due is $ 190,656 (giving credit for residents of 2 existing SFRs).

PR2. Any in lieu fees imposed under Chapter 17.35 shall be due and payable to the City prior to issuance of a building permit for each dwelling unit.

PR3. A dwelling unit tax (DUT) is also due based on the number of units and additional bedrooms per City Code Chapter 3.15. The Project mix includes 4 four-bedroom units and 4 three-bedroom units for a total DUT of $220.

PR4. Calculations may change if the number of units change, if any areas do not conform to the Ordinance and City Code Chapter 17.35, if the fee schedule for new residential development fees due in lieu of ________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
parkland dedication changes before this Project is deemed complete by Planning, and/or if City Council makes any changes.

POLICE
PD1. There shall be positioned near the entrance an illustrative diagram of the complex, which shows the location of the viewer and unit designations within the complex, including separate building designations.

This diagram shall be illuminated and should be protected by vandal and weather resistant covers.

PD2. Each distinct unit within the building shall have its address displayed on or directly above both front and rear doors.

PD3. All construction of dwelling units shall conform to the requirements of the Uniform Building Security Code as adopted by the City of Santa Clara City Council.

PD4. All entrances to the parking areas (structure, surface, subterranean, etc.) shall be posted with appropriate signage to discourage trespassing, unauthorized parking, etc. (See California Vehicle Code section 22658(a) for guidance)
PD5. Applicant shall install signage to prevent theft from vehicles in the parking lots. In addition, the use of quality lighting, installation of high-quality video cameras/recorders, and license plate readers are highly encouraged to prevent thefts from vehicles.

PUBLIC WORKS

ENGINEERING
E1. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be identified for compliance during the site clearance process. Contact Public Works Department at (408) 615-3000 for further information.

E2. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be included within a Single Encroachment Permit issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E3. Submit public improvement plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of subdivision map and/or issuance of building permits.

E4. Developer shall provide a complete storm drain study for the 10-year and 100-year storm events. The grading plans shall include the overland release for the 100-year storm event and any localized flooding areas. System improvements, if needed, will be at developer's expense.

E5. Construct the storm drain main along Pomeroy Avenue (from El Camino Real) to serve the proposed development with stub beyond proposed manhole for future construction extending to the southern property line. The main size shall be sufficient to convey the 10-year event for the entire tributary area as approved by the City. Storm drain main shall be 18” per approved tributary area analysis.

E6. Obtain Caltrans permit for all work or traffic control within the State right-of-way portion of El Camino Real.

E7. Sanitary sewer (SS) laterals shall be VCP or SDR-26 PVC (6” diameter minimum if serving 5 or more dwelling units, 4” diameter minimum if serving less than 5 dwelling units) and have a minimum slope of 2%. The minimum cover for lateral from top of curb shall not be less than 4.5 feet.

E8. Connection of the new Sanitary Sewer lateral to the existing Sanitary Sewer main shall be per City standard details SS-2 and SS-3
E9. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his ________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.

E10. Existing non-standard or non-ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E11. After City Council approval of the Tentative Subdivision Map, submit 10 copies of the Final Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees. The City approved Final Map shall be recorded by developer prior to Building Permit issuance.

E12. File and record Subdivision Map to create parcels for proposed development and pay all appropriate fee(s) prior to Building Permit issuance.

E13. Dedicate required on-site easements for sidewalk and any new public utilities by means of subdivision map or approve instrument at time of development.

E14. Sanitary sewer and storm drain mains and laterals shall be outside the drip line of mature trees or 10’ clear of the tree trunk whichever is greater.

E15. SVP joint trench shall have a concrete cap for portions not under the public sidewalk.

E16. Entire width of Pomeroy Avenue along property frontage shall be treated with a cape seal with digouts.

If the encroachment permit for the Project’s off-site improvements is not submitted within two (2) years of Final Approval for the Project, the required pavement treatment is subject to revision per the City's pavement program recommendations at the time of encroachment permit issuance. For purposes of this condition, “Final Approval” shall mean the final vote of the City Council necessary for all entitlements to be approved, unless a legal challenge is brought to the Council decisions, in which case the Final Approval shall mean the final disposition of the legal challenge.

E17. On-street parking shall not be counted towards on-site parking requirements.

E18. Proposed driveway shall accommodate fire truck/engine turning template.

E19. All proposed driveway, sidewalk, walkway, curb & gutter, and curb ramp shall be ADA compliant.

E20. Proposed driveways shall be per City standard ST-8 driveways and comply with Driveway’s Triangle of Safety.

E21. All traffic striping, messages, and symbols shall be thermoplastic.

E22. Provide a minimum of 5’ wide sidewalk with 4.5’ wide planter strip along the property frontage.

E23. Proposed trees shall be 5’ minimum clear of sidewalks. Provide root barriers when the drip line of the mature trees covers the sidewalk. Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barriers for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.

E24. For the proposed project, provide 4 Class II bicycle rack spaces.

STREETS DIVISION

STORMWATER
ST1. Although this Project does not create over 10,000 SF of impervious surfaces and thus, not considered a C.3 Regulated project, it proposes to install over 3,000-SF permeable pavers. In accordance to the City of Santa Clara’s NPDES Permit No. CAS612008, provision C.3.h.ii.(4) and (6), this Project shall be inspected annually. For this reason, the Project shall enter into an agreement with the City of Santa Clara and have an HOA or similar entity responsible for the maintenance and operation of the common- area permeable-paved driveway as well as the associated inspection fees.

ST2. Finalize Stormwater Management Plan to clearly note location of porous pavement.

ST3. Include General Notes on the C.3 Stormwater Treatment Facilities Construction on the improvement plans.

ST4. During the construction phase, permeable pavement shall be inspected for conformance to approved plans by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party inspection letter shall be submitted to the Public Works Department. As-Built drawing shall be submitted to the Public Works Department. Building occupancy will not be issued until all stormwater ________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
treatment measures have been adequately inspected and O&M Agreement is executed. For more information contact Rinta Perkins at (408) 615-3081 or [email protected] ST5. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans in accordance with the City’s Urban Runoff Pollution Prevention Program standards prior to the issuance of Building or Grading Permits. Proposed BMPs shall be submitted to and thereafter reviewed by the Planning Division and the Building Inspection Division for incorporation into construction drawings and specifications.

ST6. The Project shall have a legal entity formed that is responsible for the maintenance, operation as well as the associated inspection fees. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures in perpetuity. Applicants should contact Karin Hickey at (408) 615-3097 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater.

ST7. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.

ST8. Any site design measures used to reduce the size of stormwater treatment measures shall not be removed from the project without the corresponding resizing of the stormwater treatment measures and an amendment of the property’s O&M Agreement.

ST9. Stormwater treatment facilities must be designed and installed to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C). They shall be installed using biotreatment soil media that meet the minimum specifications as set forth in this Handbook.

ST10. Developer shall select appropriate plant materials to promote stormwater treatment measure while implementing integrated pest management and water conservation practices in accordance to the SCVRUPPP C.3 Stormwater Handbook (Appendix D).

SOLID WASTE
SW1 Project applicant acknowledges that permeable-paved driveway shall be designed to sustain the weight of a collection truck of at least 60,000 lbs. and that the maximum straight-line distance allowed for a collection truck to back-up is 100 feet. Project applicant agrees to bear the costs to repair damages to permeable-paved driveway caused by collection trucks over time.

SW2 Yard waste debris generated from the maintenance of common areas landscape shall be self-hauled by landscape contractor for recycling, which shall be noted on the Post-Construction Solid Waste Generation and Estimation Form.

SW3 [During Construction] Project shall comply with City Code Section 8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list. Applicant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com. Insert the General Notes for the Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit.

SW4 [Prior to Issuance of Building permit] This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Applicant will be required to sign Exclusive Franchise Hauling Acknowledgment form provided by building staff.

SW5 Prior to obtaining a Temporary or Final Certificate of Occupancy, weight tickets for all materials generated for discard or reuse by the project during demolition and construction activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required.

SW6 Each unit must have adequate space available for garbage and recycling containers to be stored within the unit.
________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
SW7 Garbage service level required for residential developments (single-family and multi-family) shall be no less than twenty (20) gallons per unit. All project shall submit to the Public Works Department the preliminary refuse service level assessment for approval.

LANDSCAPE:

L1 Include City of Santa Clara Tree Preservation/City Arborist specifications on all improvement plans.

L2 No cutting of any part of private trees, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).

L3 Identified existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City of Santa Clara prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.

SILICON VALLEY POWER
SVP1. Pull boxes for SVP secondary, fiber and streetlight to be designed in detailed design. New streetlights/streetlight foundations to be included as part of detailed design.

SVP2. The Developer shall provide and install electric facilities per Santa Clara City Code chapter 17.15.210.

SVP3. Electric service shall be underground. See Electric Department Rules and Regulations for available services.

SVP4. Installation of underground facilities shall be in accordance with City of Santa Clara Electric Department standard UG-1000, latest version, and Santa Clara City Code chapter 17.15.050.

SVP5. Underground service entrance conduits and conductors shall be “privately” owned, maintained, and installed per City Building Inspection Division Codes. Electric meters and main disconnects shall be installed per Silicon Valley Power Standard MS-G7, Rev. 2.

SVP6. The developer shall grant to the City, without cost, all easements and/or right of way necessary for serving the property of the developer and for the installation of utilities (Santa Clara City Code chapter

17.15.110).

SVP7. If the “legal description” (not “marketing description”) of the units is condominium or apartment, then all electric meters and services disconnects shall be grouped at one location, outside of the building or in a utility room accessible directly from the outside. If they are townhomes or single-family residences, then each unit shall have it’s own meter, located on the structure. A double hasp locking arrangement shall be provided on the main switchboard door(s). Utility room door(s) shall have a double hasp locking arrangement or a lock box shall be provided. Utility room door(s) shall not be alarmed.

SVP8. All trees, existing and proposed, shall be a minimum of five (5) feet from any existing or proposed Electric Department facilities. Existing trees in conflict will have to be removed. Trees shall not be planted in PUE’s or electric easements.

SVP9. Any relocation of existing electric facilities shall be at Developer’s expense.

SVP10. Electric Load Increase fees may be applicable.

SVP11. The developer shall provide the City, in accordance with current City standards and specifications, all trenching, backfill, resurfacing, landscaping, conduit, junction boxes, vaults, street light foundations, equipment pads and subsurface housings required for power distribution, street lighting, and signal communication systems, as required by the City in the development of frontage and on-site property.

Upon completion of improvements satisfactory to the City, the City shall accept the work. Developer shall further install at his cost the service facilities, consisting of service wires, cables, conductors, and associated equipment necessary to connect a customer to the electrical supply system of and by the City. After completion of the facilities installed by developer, the City shall furnish and install all cable, switches, street lighting poles, luminaries, transformers, meters, and other equipment that it deems necessary for the betterment of the system (Santa Clara City Code chapter 17.15.210 (2)).

SVP12. Electrical improvements (including underground electrical conduits along frontage of properties) may be required if any single non-residential private improvement valued at $200,000 or more or any ________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
series of non-residential private improvements made within a three-year period valued at $200,000 or more (Santa Clara City Code Title 17 Appendix A (Table III)).

SVP13. Encroachment permits will not be signed off by Silicon Valley Power until Developers Work substructure construction drawing has been completed.

SVP14. All SVP-owned equipment is to be covered by an Underground Electric Easement (U.G.E.E.) This is different than a PUE. Only publically-owned dry utilities can be in a UGEE. Other facilities can be in a joint trench configuration with SVP, separated by a 1’ clearance, providing that they are constructed simultaneously with SVP facilities. See UG 1000 for details.

SVP15. All existing SVP facilities, onsite or offsite, are to remain unless specifically addressed by SVP personnel by separate document. It is the Developers responsibility to maintain all clearances from equipment and easements. Developer to contact SVP outside of the PCC process for clear definitions of these clearance requirements. Developer should not assume that SVP will be removing any existing facilities without detailed design drawings from SVP indicating potential removals. Simply indicating that SVP facilities are to be removed or relocated on conceptual plans does not imply that this action has been approved by SVP.

SVP16. All interior meter rooms are to have direct, outside access through only ONE door. Interior electric rooms must be enclosed in a dedicated electric room and cannot be in an open warehouse or office space.

SVP17. Applicant is advised to contact SVP (CSC Electric Department) to obtain specific design and utility requirements that are required for building permit review/approval submittal. Please provide a site plan to Leonard Buttitta at 408-615-6620 to facilitate plan review.

WATER & SEWER
W1. Prior to issuance of Building Permits, the applicant shall submit design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.

W2. Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around onsite public water appurtenances. The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-of-way without overlapping any public utility easement. Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.

W3. Prior to issuance of Building Permits, the applicant shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12’’ minimum vertical clearance is maintained.

The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and in stall a new service to accommodate the water needs of the project.

W4. The applicant shall contact the Water & Sewer Utilities Department, for fire flow information at (408) 615- 2000.

W5. The applicant must indicate the pipe material and the size of existing water and sewer main(s) on the plans.

W6. Applicant shall utilize one of the two existing water service for dedicated irrigation service, if possible.

W7. Water Dept. Standard Details and Notes shall be included in design drawings.

W8. Applicant shall adhere to and provide a note indicating all horizontal and vertical clearances. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services: 10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water services, 5' from gas utilities, and 5’ from the edge of the propose or existing driveway.

For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal ________________________________________________________________________________ 1530 and 1540 Pomeroy Avenue
PLN2019-13924
clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities).

W9. Applicant shall reconcile landscaping and civil design drawings to match, landscaping drawings point of connection is at the existing water service and civil drawings call out for new irrigation water service installation.

W10. The applicant shall submit a composite utility plan showing all utilities (including electrical) and landscaping (trees/shrubber y) so that the Water Department can verify conflicts for proposed water services. Note that all new water meters and backflow prevention devices shall be located behind the sidewalk in a landscape area.

W11. The applicant must indicate the services to be connected to the 10” CIP on Pomeroy Avenue instead of the 8” CIP main.

W12. The applicant to explore installing meters and backflow preventer devices in the landscaping strip next to the curb.

W13. The applicant shall submit plans for independent water service to each in dividual residential unit, and a single service with private submeters for the attached units, connected to a public main in the public right- of-way to the satisfaction of the Director of Water & Sewer Utilities. Individual water services to single family residential shall be 1” water services. The applicant must coordinate and obtain Water Department approval to install a single service connection split into multiple meters.

; p
j ! !
,,..,. 'v;�t1utor,/I,: WJW"\od,o
� i'
r �i...c, -::::....-™-�
[ J, .... ,, ___ $_� ·-�-.

EIGam,ooReel . ,.,.,,._,G_, ®
.. ..::,::::�� ·-.. -· -!-.�.-·
1�---,,. .. -•- IE • 1
_ .. /'
[ i - � .............
i,D ...
ca1o"oA1a
f
G�p
►"" •::'-..- ""-=· •
! 1 EIS<hM1'S1
-:>\

VICINITY MAP
PROPOSED RESIDENTIAL PROJECT AT:
1530 /
.. f
v,att;,,._,�r !
'
.Je,;,ldA,o
,,.,.,_...,,..,,.
--. . . EICom100Real
·�'·-~· t
. .

Aot·•S. &Alec
l'
;
'"""''
FrMm
f!S<,1,...,,.. , ,~
<
NQRT ..
®
1540 POMEROY AVE. SANT A CLARA,

RIGDECREST GROUP , INC
OMID SHAKERI ( 408) 666-6556
7530 / 7540 POMEROY AVE.

SANT A CLARA, CA
APN: 290-02-097 & 096
- -
l
OCCUPANCY TYPE: R-3/U
-� CONSTRUCTION TYPE: V-B
1530 & 1540 POMEROY
LOT SIZE: 21,000 S.F. PROPOSED
AVE.

LOT COVERAGE 7,810 S.F (37.2%)
LANDSCAPE COVERAGE 8,500 S.F. (40.5%)
1530 POMEROY AVE.

R3-18D
LOT SIZE: 10,080 S.F. PROPOSED
LOT COVERAGE 2,880 S.F. (28.5%)
LANDSCAPE COVERAGE 4,130 S.F. (41%)
BUILDING HEIGHT 24'-8"
PROJECT SCOPE:

REQUIRED
35% MAX.
40% MIN.
25'-0" MAX .
2 SINGLE FAMILY DTACHE HOMES WITH 2 CARS GARAGE EACH
3 GUEST PARKING

OPEN LANDSCAPE / COMMON SPACE
EACH HOUSE: 2,165 SQ FT. LIVING SPACE:
420 SQ .FT. GARAGE
1540 POMEROY AVE.

R3-36D
LOT SIZE: 10,920 S.F. PROPOSED REQUIRED
LOT COVERAGE 4,914 S.F. ( 45%) 45% MAX.

LANDSCAPE COVERAGE 4,370 S.F. (40%) 40% MIN.

BUILDING HEIGHT 36'-6" 45'-0" MAX.

PROJECT SCOPE:
6 TWO STORY UNITS 'MTH ATTACHED 2 CAR GARAGE EACH
EACH UNIT: 1,970 SQ FT. LIVING SPACE:
400 SQ .FT. GARAGE

PROJECT SUMMARY
I
-
CA
CH
[ID(ru��(ru�
Arc�iltdurt
916.435.0605
SHEET INDEX 408.674.1077.
□
A1.1 PROJECT DA TA
A1.2 SITE PLAN
1530 POMEROY AVE.

A2.1 TYPICAL FLOOR PLANS (LARGE)
A2.2 FIRST & SECOND FLOOR PLANS
A2.3 THIRD FLOOR PLAN / ROOF PLAN
A3.1 EXTERIOR ELEVATIONS 0.

A3.2 EXTERIOR ELEVATIONS
�
1540 POMEROY AVE .

B2.1 TYPICAL FLOOR PLANS
B3.1 EXTERIOR ELEVATIONS
c, CIVIL COVER SHEET
C2 UTILITY PLAN
uj C3 GRADING & DRAINAGE i:; >< <
C4 STORM WATER CONTROL PLAN t-- >-0 0
C5 STORM DRAIN PLAN w a:< 0 !:110 C6 DETAILS a: 0. !.:fTM TENTATIVE PLAN ...J o< � ;o
� -<
�! w a:

S-S-2020
"""
-CB

AUTOMATIC RESIDENTIAL FIRE SPRINKLERS
JCIBND
l
4-3�
TO BE INSTALLED (UNDER SEPARATE PERMIT) .......

A1.1
SHEET INDEX IE """"
I
I
I
I
I
PPI
/
0 0
Lri
VJ
in
N
--- -"""i
I
I
I
0 I
0 0
VJ
I :;.

I ~
I "
0 I
0 z
GARAGE
THIRD FLOOR: 750 S.F. SECOND FLOOR: 820 S.F. FIRST FLOOR: 400 SQ.FT.

GARAGE: 400 S.F.
1540 POMEROY
TOTAL LIVING SPACE: 1,970 SQ.FT.

UNITS 1 TO 6
TYPICAL FLOOR PLAN 1/4"= 1'-0"
~I 81
r.======. I i
CHI
[ID@~~@~ i
~rc~llcdure 1
916.435.0605 I 408.674.10771
j
□1 !
I
uJ (J) i > z I
: ~ I
0 <D I ffi 0 ::!! f-
!( - I
~ ~ I
Ill ; i
I
i-------1! i
i !
I
~ I
f- I
~ ~ < ;
~ ~ o~ I
.J a: ;
< w I
ffi ~~ I
Q O !z • m .... < Ii a: ~ en
~n-,~• i
"'"D -ca 1• ......
1------l!
""""'- ' !
A2.1 i
I
<F ..,,. i
[] [] [] [] [] []

SECOND FLOOR
IS'-1" 14'-6" 21'-6" 14'-6" 21'-6" 14'-6" IS'-1"
13'-S" I'-"
---------==----------==----------==-----------l!:=L---------~-----------~

FIRST FLOOR
FLOOR PLANS 1/4"= 1'-0"
~I 81 ===' i
CHI
oo@~~@~ I
~rc~llcdure 1
916.435.0605 I 408.674.10771
j
□1
~ (/)
>- :l! 0 .J a: 11.
w a: :; 0
Oo 11. .J
0 LL
;'i
!
I
i
I
I I ' !
I
1--------t ! i
i !
I
~ I
f- I
~ ~ < ;
~ ~ o~ I
.J a: ;
< w I
ffi ~~ I
Q O !z • m .... < Ii a: ~ en
~,,-,~• I
"'"D
:-: I
1-------t!
' !
A2.2 i
I
<F ..,,. i

ROOF PLAN
-ca 1• ......
1------1!
THIRD FLOOR ........ ' !
A2.3 i
FLOOR PLANS/ ROOF PLAN 1/4"= 1'-0" I
<F ..,,. i
COMPOSITION Si-!INGLES
~-- ROOFING
1-lORIZONTAL
~ SIDING
iP
Si-!INGLE
SIDING
~ .,
"' ~
iP
~
iP

ENTRANCE SIDE ELEVATIONS - NORTH

TOF FLT
FF

TOF FLT
FF

FRONT ELEVATIONS - EAST - POMEROY VIEW
ELEVATIONS 1/4"=1'-0"
~I 81
r.====a' i
CHI
oo@~~@~ I
~rc~llcdure 1
916.435.0605 I 408.674.10771
j
□1 !
I
i
I
I I ' !
I
1------1!
i
i !
I
~ I
f- I
~ ~ < ;
~ ~ o~ I
.J a: ;
< w I
ffi ~~ I
Q O !z • m .... < Ii a: ~ en
~-•-•··· I '°"D
-ca 1• ......
1------1!
' !
A3.1 i
I
<F ..,,. i
1!;40 POMEROY AVE.

DRIVEWAY ELEVATIONS - SOUTH

COMPOSITION SI-IINGLES
~-- ROOFING

REAR ELEVATIONS - WEST

ELEVATIONS

I-IORIZONTAL SIDING

SI-IINGLE
SIDING

I-IORIZONTAL SIDING
1/4"= 1'-0"
~I 81 ==' i
CHI
[ID@~~@~ i
~rc~llcdure 1
916.435.0605 I 408.674.10771
j
□1 !
I
~ i
I
~!@ I ffjQ ::;!;;:
0> 1· D.W
~ iil i
I
t---------1!
i
i !
I
~ I
f- I
~ ~ < ;
~ ~ o~ I
.J a: ;
< w I
ffi ~~ I
Q O !z . m .... < Ii a: ~ en
~-,-,.,. i
'°"D
-ca 1• ......
t---------1! ........ ' !
A3.2 i
I
<F ..,,. i
c____ __ ____,57 I
~~
I-"========'
;::::::::=1;::::::::=;00
~ m
0-----+--------+----I IE] ;a
M. BEDROOM
DN -~
"=="'-'=IE]=f',_'1!.!====c:::::::;-,
Loft Open lo 6elow
II
M. BATH □
~1~x=111 ;I.I----'""'"-""'" --+---II--+~"'·''--" ------,t BEDROOM 2 ~ ~ BEDROOM 3

SECOND FLOOR
LIVING AREA: 1,040 SQ.FT.

GUEST ROOM
GARAGE
I I
11 l:::;,>=~~+-===;aa-+-=__::r===;;==!===;:J_= ~-----
1530 POMEROY

FLOOR PLAN
1 I
FAMILY ROOM '1
•

FIRST FLOOR
LIVING AREA: 1,125 SQ.FT.

GARAGE: 420 S.F.

DNNG ROOM
TOTAL LIVING SPACE: 2,165 SQ.FT.

TYPICAL FLOOR PLAN 114•= r-o··
~I 81 ===' i
CHI
[ID@~~@~ i
~rc~llcdure 1
916.435.0605 I 408.674.10771
j
□1 !
I
~ i
► < I ii? ir '
~§ I
O LL i ta ~ !
I
1------------1 ! i
i !
I
~ I
f- I
~ ~ < ;
~ ~ o~ I
.J a: ;
< w I
ffi ~~ I
Q O !z • m'°< 1: a: ~ en
~,,.,~. i
IRW'l:ED 1, ......
1------------1!
........ ' !

82.1 i
I ... ..,,. i

DRIVEWAY ELEVATIONS - NORTH
_,,-,,.,,__
Ill II ,.,.,,,
~ 1111 1111 II II 1111 II II II _,,,,,, II _., II II 1111 II II 1111 1111 II II 1111 _,,.,, IIJ.r11'111 II 111111111111111 IIIIII I 11111111111111111111 II II llllll llll11lffi.ll Sf-llNGLE
SID ING ~ LJLJ 111 II II T II I II I I II I II
6-14, II I 11 II s= II II II II 111 ri I 11 I II
m 111 II 11 I I I II 1111 11 I II I I
Ill 1111 II I I 111 111 I 111 I II I I I
II II
~ J.,, II II II II
ffi ~
~
--
=== t===
--
===

REAR ELEVATION - SOUTH
1111
f-lORIZONTAL
SIDING
f-lORI
SI
-
ZONTA
DING
L
COMPOSITION Sf-llNGLES
I

ROOFING
4v
.,,, II -.-,,r 1111111111 Lil'I 11111111 -__,,,.,,, II II II II 1111 -,,......__ - - ,nP Pl,
11 II II -- )Ii I Ill
1111 11 rn I ~
f
111 II -- .l. I I I (fl
II I I I W- ~
-•"
.,_ TOP FLT '1-
~,: r --u II- ~ LI ~HI[:::
==u 11= =
~ <P
= FF

FRONT ELEVATION - EAST - POMEROY VIEW
1530 POMEROY AVE,
~ II I I II I 11 II 11.,_
II II" II II
- 1111 II II 11~, II 1111
~ 1111 1111111111111111 I II I 11 "l1-l,L,II I 111 111111 I --
II I II I I T 111 I II I
111 111 I ,;,,= I 1111 J
fliY
1111 I I-I'll
111 11 I I I II
I I II I I 11 I I I II - I -
" I II -- II 1111
= Ill
~
"I " I
~
"I " -I
II
I
II

SIDE ELEVATION - WEST

TYPICAL FLOOR PLAN
~
Sf-llNGL
SIDING
f-l ORIZONT
1/4"= 1'-0"
~I 81 ===' i
CHI
[ID@~~@~ i
~rc~llcdure 1
916.435.0605 I 408.674.10771
j
□1 !
I
i
I
I i ' !
I
t------ti
i
i !
I I I ;
I I ;
I
I
I
:;;;::;;:::,_=S-21Z'=,.:::::::i
'°"D
-ca 1• ......
t------t!
' !
B3.1 i
I
<F ..,,. i

IMPROVEMENT PLANS
1530/1540 POMEROY AVE. SANTA CLARA, CA 95051
ABBREVIATIONS EASEMENT ABBREVIATIONS:

EVAE

AB AGGREGATIBASE LNO'G LANDING
AC ASPHALT CONCRETE LP LOW PllNT m

AO AAEADRAIN
BC BACl( Of CUR8 Voi ~~E~l Pff
BFl BACKFLOW PREVENTOR (N) NEW
BW BOTTOM Of WALL O.R. OVERLANORELEASE
C&G CURBANDGUffiR PB PIJ..L BOX
~~~ ff~~b1~~ SWALE

CO CLHNOUT
[s ltll[;r

OTL OET,',JL
OW'!' DRlvt:WAY
El.CT ELECTRIC
PGEV PC&:E VAUI.T
~ ~~:~;~ATED PIPE
PSE PUBLIC SER\.1CE E,',SD.IENT
p-,:: POLY\.1tl\'I ... Cl-lORIOE
:: : ~ :;~A~ormim PIPE

SB SEIBACK
PSSE
UCEE
._,

EP EDGEOFPAVEWENT EILVATION SD STORMDRAIN
EUC EUCALiPllJSTREE
(E),EX EXISTING
FF" FINISH FLOOR
Ft FINlSH GRADE
ft '1/'!,/lll/""1
~ ~~CEIF CURB

GB GRAOEBREAA

GUY GUY'MRE

HP HIGH POINT

DP DUCTIU IRON PPE

INV INVERT
.P J)tlT PO..E
~p ~;~~~R (UllUTY)

EXISTING
SDMH STORM ORAIN MAlfi O..E

STD STANDARD
SS SANITARYSE'll[R
SSMH SANITARYSE'llfRMANHCU:

SW SIOEW,',JJ(

TC HP OF CURB
tb ~g: b~/JATION

TOS TCPOFSLAB
TP TOP OF PA\OIEtH
TW TCP Of WAli
(T'rl') TIPICAL
~ ~~:~N?ti~i:E
WL.J< WALJ<WAY
¥At WAT£R MrnR
WATER VMl/t.

LEGEND

PROPOSED DESCRIPTION
STREET"CENTER LINE

DISTINCTM BORDER LJNE

LOT LINE
EMERGENCY \lrHIQE ACCESS EASEMENT
FlRELADOEREASEMENT

PRIVATE INGRESS/EGRESS EASEMENT

PRIVATE STORM DR AINAGE EASEMENT

PRIVATE SANITAAY SEWER EASEMENT

PRIVATE WATER EASEMENT
SIOEWAl..l( EASEMENT

UNDERGROUND ELECTRICAL EASEMENT

WATER LINE EASEMENT
_.j

ONE LOT SUBDIVISION FOR CONDOMINIUM PURPOSES
EIGHT (8) RESIDENTIAL CONDOMINIUM UNITS
.

30.00'
-- ; "" _ .. _ t
'-·
. ::::....,-
l
I

PROJECT SITE
j
·=--

LOCATION MAP
N. T.S.
__ , __
--c--

BUIWING FOOTPRINT
Flll.AA EA LIMIT : ,__ __ __,,=--- -+1-- ....------ ""'------ ~ ...-----~ = ---- ~ - ---~ --------1 ~ -.........___..102 __
--suo----
OH eTW
--fl-­
[g]SLV
ossco
QSSMi
@SDMII
"
/; '\
/ 0 ;
\',-~·-'
0 •I
--------·.,-- ~~~i: I "',~----~ ~ -.

5.2' SIDEWAlX
--w----__ ,. __
--ss--__ ..,_
e OH 1-UY __ , __ __ , __
--Jr--
18] "-V
·= .... ,
®SIIIOi
Ill

WATER LINE

STORMDRAINPIPE(SOLID)

SANITAAY SEWER PIPE
SUBDRAIN PIPE (PE:RFORATED)

OVERHEAD UTIUTIESWITHPOLE

ELECTRIC LJNE (UNOERGROUND)

JOINTTRENCH (UNOERCROUNO)
[8JWM WATER MITER
/;-,,,
r e I TREE WITH TRUNK
'e/
- , --, - 6' WOOOENFENCE
102.2J SPOT U EVATJON .,---

TREE PROTECTION FENCE
5' TALL CHAIN LJNK

EARTHSWALE
---- CONCRCTE SWALE
I

INLET/ J UNCTION BOX
GRADE TO DRAIN, 2% MIN. AWAY fROM HOUSE
, ,- MIN. FROM PROPERTY LJNE TO SWALE
(E) TREETOBE REMOVE
TYPI CAL POMEROY AVENUE STREET SECTION (60.00' R-0-W)
NTS
ELEC. CONDUITS FOR

6.00' UGEE

DEDICATION

STD CSC CURB &
18" AC

1.50'

SIDEWALK

EASEMENT

DEDICATI ON
EX. WATER
EX. SS

30.00' 30.00'

20.0· 10.0'

5.2' SIDEWALK PARKSffilP
l::,:::--~--1'__ ... ss
0-_NENSO PORTIONS OF POMEROY
TYPI CAL POMERO Y AVENUE S TREET SE CTION ( 60 .00 ' R-0- W) SCALE: 1" = 1 Q'
SHEET INDEX:

COVER SHEET

PRELIMINARY UTILITY PLAN

PRELIMINARY GRADING ANO DRAINAGE PLAN
C- 4 PRELJMINARY STORMWATER CONTROL PLAN
C- 5 STORM DRAIN MAIN IN POMEROY
C- 6 DETAILS, CROSS SECTIONS
BASIS OF BEARINGS:

THE BEARING N. 0•1,f oo' W. OF THE CENTERLINE OF POMEROY AVE., AS SHOWN UPON CERTAIN TRACT NO. 2908, RECORDED IN BOOK 140 OF MAPS AT PAGE 31, WAS TAKEN AS BASIS O F BEARINGS FOR THIS SURVEY MAP .

REFERENCED CITY OF SANTA CLARA B.M
BM fl E-1 3 CHISLEO CROSS ON SE B OLT IN TRAFFIC LIGHT BASE. AT NW CORNER OF EL CAMINO REAL &: POMEROY AVE. EL.; 9 1.06' (NAVD8
APPROVED: Raj eev Batra
Director of Public Works/ City Engineer, City of Santa Clara Engineer ing Depart ment
Land and Property Develop ment Division
Waler and Sewer Uti liti es
Street Depart ment
Silicon Va lley Power Date

E NG I N EE RS

C IV IL ENG I N EE R S
ECCO Builders, INC.

Omid Shakeri
12280Sarc toga- Sunnyvale Rd
Suile10 9
Sarctoga,CA9 5070
Phone: (~08) 666- 6556
Emol omld@eccobu~ders.com
COP: ~ ~~EE2R°i0
CIW. ENGINEERS
10/21/2020
Sca le,
S.R
-· 2 200 50
1 OF6
C-1
A/ C-6 A/ C-6
B/ C-6
B/ C-6
NOTES:

WATER CLEARANCE NOTE:WATER KEY NOTES:

1. INSTALL<I- NE W1" ¥iM l'l!Tl-1 +--N EW 1" WATER SERVICEPER CITY WATER DEPARTMENT STANDARD NO. 1, BRANCHED FROM NEW 4' DIP WATER LATERAL, PER a TY WATER DEPARTMENT STANDARD NO. 11, BANKED IN A B - 60 UTILITY (JO" X 60") BOX fORLOTSDOMESTIC USE,& FlRESPRINKLfRSUNITAAN DB. LOCATE THE 'li!.fS IN Tl-lE PARKSTRIP. INSTALL 4"GATEVALVEFOR4"DIPWATERSERVICEPER CITYWATER OEPARTMEtH STANOAAD NO. 19 & 20

2. FOR LOT 1 COMM~ LANDSCAPE IRRIGATION WM. INSTALL (N) 1" WATER SER\.1CE 'MTH RP, PER QTY WATER DEPAR TMENT STANDARD NO. J. LOCATE THE WM & VALVE BOX AT 9'.44 BACK 0f6.o' UGEE,INSIDE 15.0''MDEP\lj[

3. INSTALL NEW 4" DIP FIRE SERVICE ANO (N) 4" RPBPA ...SSEMBLY PER WA TE R OEPT.

STANDARD 17, WTH 4" CATE VALVE PER OTY WATER DEPARTMENT STANDARD NO. 19 & 20. INSTAU. TRUSTxBl.,__OCl(\'1,T BENDS PER CI TY WATER OEPARTMEtH STANDARD NO

20. LOCATE THE 4" RPBPAASSEMBLYAT8ACKCf"6.0' UGEE.INSIDE15.0'WIDEPWE. ~~lgLugtrJR;.'j~~~. AfHHJRlplBa1~ ;~~~D~A1N~z~E t~11~t:~MG l~L~~~~~!t L AND CLEARANCE AT WATER SERVICE,.CROSSING WI TH OTI-,ER UTlLITIES, AND ALL REQUIRED MINIMUM HORIZONTAL CLEARANCES FROM WATER SERVICES: 10' FROM SANITARY SEv.£R UTILITIES. 10· FROM RECYCLED WATER UTILITIES, e· FROM STORM DRAIN UTILITIES, s· FROM FIRE AND OTHER WATER UTILI TIES, 3' FROM ABANDONED WATER SERVICES, s· FROM GAS ~~~~SWA~~~. s::;~~c~cif:~D ~A ~R ~ ~LiT~Er 0+'~E 0: p i~~~N? ~~~ w::i·N-fZ~ ~A~ 1~&'M VAY HORIZONTAL CLEARANCE OF 10' FROM EXISTING AND PROPOSED TREE~ IF A PPLICANT INSTALLS TREE ROOT BARRIERS, CLEARANCE FROM TREE REDUCES TO 5 ' ( CLEARANCE MUST

BE FROM THE EDGE OF TREE ROOT BARRIER TO EDGE OF WATER FACILITIES) i:;:19267
'"
(N)UNDERGROUNDELEC.CONOL.HS
f 0R F1JT1JREIJNOERG1?0UNDING
CT~ ; 1s~}~ t~JBOTH EN0~222
- ... ·- -·- -·· -· ··· ·· ·· ··· ·· --- !ID-------------................... ..... 50 LFN 6" P\IC 0 1,:

I
I
15 LFN6 "1PVC
I
I
I
\
/
/
/
'. _;;c,d ~::'5f i:
. .
~ ,:ltl)'Jl8.J' ••• ••
. . . . . .P}&;(,-.11t;;,~·96.-:+:-:-:-
-:•:-:-:-:-, ,naa I 9F}1'>?f.1'-;;z:-:
;:;'.:'.;'.:'.:'. ......... /.... ·~-:::::::::::a~·-·
::):::::::::: :;:.:;.;;:.:.;:.;:::;.z;.:_::;;~:
::~~~:::: ~~~ :: : : : : : : : : : : : : : : : : : :: : : : : : : : : : :

ALL UTILITIES SERVING NEW DEVELOPMENT SHALL BE PRIVATELY OWNED ANO MAINTAINED.

THE DEVELOPER SHALL PROVIDE Tl-,[ CITY, IN ACCORDANCE WI TH CURRENT CITY

STANDARDS AND SPECIFICATIONS, ALL TRENCHING, BACKFILL, RESURFACING, LANDSCAPING, CONDUI T, JJN CTION BOXES. VAULTS, STREET LIGHT F OUNDATIONS, EQUIPMENT PADS AND

SUBSURFACE HOUSINGS REQUIRED FOR POWER DISTRIBU TION, STREET LIGHTING, AND SIGNAL COMMUNICATION SYSTEMS, AS REQUIRED BY Tl-,[ CITY IN THE DEVELOPMENT OF FRONTAGE ANO ON- SITE PROPERTY. UPON COMPLETION OF IMPROVEMENTS SATISFACTORY TO THE CITY, THE CITY SHALL ACCEPT THE WORK. DEVELOPER SHALL FURTHER INSTALL AT HIS COST THE SERVICE FACIU TIES, CONSISTING OF SERVICE \'IIRES, CABLES, CONDUCTORS, A:ND ASSOCIATED EQUIPMENT NECESSARY TO CONNECT A CUSTOMER TO THE ELECTRICAL SUPPLY SYSTEM OF AND BY Tl-,[ CITY. AFTER COMPLETION OF THE

FACILI TIES INSTALLED BY DEVELOPER, TH E CITY SHALL FURNISH AND INSTALL ALL CABLE,

SWI TCHES, STREET LIGHTING POLES, LUMINARIES, TRANSFORMERS, METERS, AND OTHER EQUIPMENT THAT IT DEEMS NECESSARY FOR THE BETTER~ ENT OF THE SYSTEM (SAN TA CLARA CITY CODE CHAPTER 17.LS.210 (2)) .

I
I
\
\
>< ?oi'r--_

GRAPHIC SCALE
w
I
.,
I

93.52 /
I
I
I
\
30'¢
DRIP46'
x93.22
\ X93.42

E NG I N EE RS

C IV IL ENGINEERS
ECCO Bu il ders, INC.

Om id Shakeri
12280Sarc toga- SunnyvaleRd
Suile10 9
Sarctog a, CA95070
Phone: (~08) 666- 6556
Emol omld@eccobu~ders.com
COP:~~~E E2R°i0
CIW. ENGINEERS
Scal~0/21/2020
,~ • 10'
Prepared b:,:

S.R
-· 220050
2 OF 6
C-2
1 C-4
3 C-6
4 C-6
4 C-6
5 C-6
A/ C-6 A/ C-6
2 C-4 2
C-4
5 C-6
1 C-4
3 C-6
B/ C-6
B/ C-6
NOTES:

TW94.00
BW9250
25LF~CllASSYSWALE
/
/ a
/
I
I
15 LF~6"/ PVC
I
K 701!--_
928,
------,
50 LF~GR f'sw

GRAPHI C SC ALE
10 0 ::, 10 w
~--.....,.... I
9339
109.01
(,~9267
.,
I
-x92 .70
"
I
I
I
I
L
~--~---'- SA.WQJT AT ~) SCORE ~AR - &
j
INSTAL.l. OWELL CellNECllCtl ,0 (E) C&C
& (E) sw f'Elt OTY S1D DllST - 18
,,,J J ""
I I I
- -~~+- IO'fRANSITIONFROMNEVI ACH£DS/W
TOfX.ATTAp-!EDSOEWALI(
La
" 20.00'
I

93.52 / 30'\ll
/ 932~RIP 46'
\ I
x 9371 \ X:9342 f
--'<-,-- ------1-'9""'0"'.!""'ll!.,f.06 :
' '1 ),
DRI~Y-... ,,
I l --+,,-,,,.k::::U,,.,, i

E NG I N EE RS

C IV IL ENG I NEERS
ECCO Buil ders, INC,
Omid Shokeri
12280Sarc toga- SunnyvaleRd
Suile10 9
Sarctogo, CA95070
Phone: (~08) 666- 6556
Emol omld@eccobu~ders.com
COP:~~~E E2R°i0
CIW. ENGINEERS
Scal~0/21/2020
,~ • 10'
Preparedb:,:

S.R
-· 220050
3 OF 6
C-3
1 C-4
3 C-6
4 C-6
4 C-6
5 C-6
2 C-4 2
C-4
5 C-6
1 C-4
3 C-6
Compliance with NPDES Permit Provision C.3:
1 Source Control Measures:

Stormwater Treatment Measures:3
Site Design Measures:2
1 2
Sto rm wo ter Trea tm en t Measures not e:

Project doesn't trig ger a numerically sized c.] design. (New and replaced Impervious areas below 10,000 SOFT)
PERMEABLE PAVER TYPE:
"CAL STONE",PERI.IEABL£QUARRY,STONE6X9 .,0REQUA L

OPERVJOUS CONCRETE PAYER S DRIVEWAY
& UNDER-DRAIN DETAI L
NTS
HATCH KEY:

D
Ga
lr.l'ER\IOOS..lllEl(ROCI')
lr.l'ER\IOOSAAEA(~C. )

GRAPHIC SCALE
10 a 5 10
i-..-----
TYP. N08AGG REGATE INOPENINGS
FOR OVERFLOW ORAINAGE ½
CONCRETEPAVERSMIN.31/8"( 80t,H,1.) Tl-llCK

CURB EDGE RESTRAINT IYITH CUT- OUTS
4" (100MM.) THICK NO. 57 STONE _ ---rl= ,"=:4•¾-I .,n!- OPEN- GRADED BASE '°'~~l:t~-t\•f-1--~~fgtt~~u:~ 81 ;{~;~i:i~o - 501.tM.) N0.2 STONESUBBASE-THICKNESS ~ ~·....,. C
VARIESv,m-l DESIGN ~
~ OPTIONAL GEOTEXTILE ON BOTTOM AND

SIDES OF OPEN- GRADED BASE SOIL SUBGRADE

TYPICAL WALKWA Y PERMEABLE
0 INTERLOCKING CONCRETE PA VERS
NTS
The Son F rancisco Boy Regional Woter Ouolity Contro l Boord (SFRWOCB) incorporoted updoted requirements int o Santo Claro County's Not ional Pollut ion Discharge Elim inat ion System ( NPDES) Permit in August 06. These updated storm woter quality control requlrements ore predomln ontly In the cotegory of new development discharge cont rols. The Permit requires that permanent, post- const ruction stor mwoter quality control measures be implemented as porl of development x proj ects
Updated stor mwater quality control measures include:
- Source Contro l Measures
- Slte Oesign Meosures
- Treatment Control Measures
Beginning August 15, 2006, oll projects creating or r eplacing 10,000 sq. ft. or more of impervlous surfac e oreo must deslgn and inst oll a permanent post - construction st ormwater treatment faci lity on the site. The system must be design and installed accord ing lo numeric sizing criteria.

All projec ts, r egordless of slze tha t create or replace Tmpervious surfa ce may be required l o install sl ormwaler quality controls l o the maximum extent proct icoble.

Thls pro ject p roposes to implement approprlo te sourc e control and site deslgn measures. The project creates/rep laces LESS TI,AN 10,000 SOFT of impervious surfac e oreo, therefore, it is not required to provide storm wot er treotm ent facilities based on numeric sizing crlteria. However, the pro ject proposes to Tmplement st ormwater treatment measures to maximize the removal of pollutan ts to the maximum ed ent proct icable
0 - Covered material storag e and Garage.
0 PRE-CONSTRUCTION VS. POST-CONSTRUCTION IMPERVIOUS AREA COMPAR ISON

DESCRIPTION
2 EX. HOUSAND DETACHED GARAGE
SHEDS
AC DWY
WALKWAYS. PORCH. PATIOS

TOTAL PROJECT IMPERVIOUS AREA

EXISTING LANDSCAPE/ GROUND

TOTAL SITE AREA

DESCRIPTION
UNITS 1 TO 6, BUILDING ROOF

UNIT A, BUILDING ROOF
UNIT 8 , BUILDING ROOF
UNITS 1 TO 6, PORCH/ PA nos
UNITS A & 8 . PORCI-V PATIOS
UNITS A. WALKWAY
UNITS 8. WALKWAY
UNITS 1 TO 6, A & 8 DRIVEWAY APPRONS

FRONTAGE PUBLIC SIDEWALK WITHIN SE DEDICATION

TRANSFORMER PAD
LOT1, PERVIOUS PAVERS DRIVEWAY & STALLS
LOT 1, PERVIOUS PAVE RS WALKWAY TO UNITS 1 TO 6

PROJECT LANDSCAPE/ GROUND
TOTAL PROJECT PERVlOUS AREA

TOTAL SITE AREA
AREA (SQFT.) AREA (ACRESJ PERCENT AG E MATERIAL
2,598 0.060 12.4% ROOFING
600 0.014 2.9% ROOFING
1,187
285
4,670
16,330
16,330
21 ,000

0.027

0.007

0.107

0.375

0.482

5.7% AC

1.4% CONCRETE

22.2% IMPERVIOUS

77.8% GROUND

77.8% PERVIOUS
100.0%
AREA (SQFT.) AREA (ACRESJ PERCENTAGE MATERIAL
4,855 0.111 23. 1% ROOF JNG
1,574 0.036 7.5% ROOF ING
1,574
703
230
103
276
62 9,661
4,533
1,037
5,879
11,449
21,000

0.016

0.005

0.002

0.002

0.006

0.001

0.002

0.024

0.135

3.3% CONCRETE

1.1% CONCRETE

0.5% CONCRETE

0.4% CONCRETE

1.3% CONCRETE

0.3% CONCRETE

0.5% CONCRETE

46.6% IMPERVIOUS

4.9% PAVER$

28.0% LANDSCAPE

64.6% PERVlOUS
AREA (SQFT .) AREA (ACRES) PERCENTAGE
4,881 0.112 23.2"1

E N G I N EE RS

C I V IL ENGINEERS
ECCO Buil ders, INC.

Omid Shakeri
12280Sorc togo- SunnyvoleRd
Suile 109
Sarotogo, CA95070
Phone: (~08) 666- 6556
Emol omld@eccobu~ders.com
COP:~~~E E2R°i0
CIW. ENGINEERS
10/21/2020
Scale,
,~ • 10'
Prepared b:,:

S.R
-· 220050
4 OF6
C-4

STORM DRAIN MAIN PROFILE
RIM91.50±(CCllFORM IDEX. AC) NEWSDMH r
: ~ ~~ ~ ~: ~g~ /~T)ll\~10 _ __ _ _ _ _ _ _ J_ _ _ _ _____ _

EX GAS MAIN, J':i DEEP (FIELD VERIFY)
I
SCALEH: 1"•20'
SCALE V: 1"•1CY ---
~0·~9 ~\\~:•00 N
',

E NG I N EE RS

C IV IL ENG I NEERS
ECCO Builders, INC,
Omid Shakeri
12280Sarc toga- SunnyvaleRd
Suile10 9
Sarctoga, CA95070
Phone: (~08) 666- 6556
Emol omld@eccobu~ders.com
C0Pffl l(JH @2020

SMPENGINEERS
CIW. ENGINEERS
10/21/2020
Sca le, 1" • 2(/
S.R
-· 220050
5 OF 6
C-5
A-A

SECTION W-W
W
PLAN
Z Z
W

SECTION Z-Z
X
PLAN
Y
X
Y

SECTION Y-YSECTION X-X
3 4
5 6
B-B
! "' .. : •. L.::: ... , .
~ ,.-::: _·:~ ..
'lff92.50
INLCT
:4;1~(1N)~.&J
2 1; v~ ~(1Nk88.o
0 STORM DRAIN INLET
NTS
0 DISCONNECTED RO.~F DO WN- SPOUT DETAIL
NTS
r
L
SCAl£ftG, 10'
SCAL.EV. 1"•10'
t19~,=--~ 1
INV(2) 4• P~Flf (IN) 90.92
INV l2" PVC (INW) 8."i.l!i
INV 12• RCP fQUT, E) 1\.1_2~
FlNISHGR,1,0E/

GAAAGEAPPROACH
0 STORM DRAIN AREA DRAI N
NTS
f.llN. S•1%AWAYP ROPERTYLINEr;-:: ,· Tl
S• 5" AWAY FROf.l BUILDll,NG MIN MA· S"'5:t
"®W/4%V.&W'~ ~ ""''" " '°' , C ™'/4%V.&W'Ai:Y
oe"" " sw,cc $ . ~-,_,0 (tV 3 MIN
c,,'<-,:,,,, 12" MAX
0 SWALE DETAIL
NTS
MIN. 20.0' DRM:ISl..£, 20.0' (EV,t,,E)(COMMONAAEA)

PRIVATE STREET TYPICAL SECT ION
NTS

E N G I N EE RS

C IV IL ENGINEERS
EC~O Buil ders, INC,
Om1d Shakeri
~~~l~ l ~~rctoga- Sunnyvale Rd
Sarctaga, CA 95070
Phone: (~08) 666- 6556
Emol amld@eccabu~ders.com
C0Pffl l(JH@ 2020

SMP ENGINEERS
CIW. ENGINEERS
10/21/2020
Sca le, AS NOTED
S.R
-· 220050
8 OF 6
C-6
GENERAL NOTES AND STATEMENTS:

Tentative Map
BASIS O F BEARING S:

MOCARINGN. 0'1 4'00' W. ()'"T\ffC£NTERUNE()'" POMEROY AW...ASSHOWN UPONC£RTAIN ~rN~~ -F:O~~~~~ :J~ 1-40 OF MAPS AT PA~ 31, WAS TAKEN AS BASlS ()'" REFERENCED CITY OF SANTA CLARA B.M
BMf E- 1J CHISL.£DCROSSOHSEBCUINTRAFflC LI GH T BASE, AT NWCORNER OF EL CAMINO REAL & POMEROY Al£ EL 91.06' (NA\08
N
~
/
I
z
\
-"' ~ ! ~
~ ~
<n ~
~ ~
i;

AREA TABLE

DESCRIPTION AREA
(SOFT.I
UNIT 1 863
UNIT2 848
UNIT 3 848
UNIT 4 848
UNIT 5 848
UNIT 6 863
UNIT A 1,574
UNIT S 1,574
PRIVATE SPACE UNIT A 500
PRIVATE SPACE UNITS 517
COMMON AREA 11 ,717
21,000
AREA
(ACRES)

0.020

0.019

0.019

0.019

0.019

0.020

0.036

0.036

0.011

0.012

0.269

0.482
- - --- - STREET CENTER LINE
------ DISTINCTI\-£ BORDER UNE
------- PROPOSOl UNITU NE
--- - -- DI STING LOT LJNE TO BE REMOVED
- - - - EASEME:NTUNE
x':l2 .73
APN# 290- 02- 092
009267
'"
- "92 .70
'"

ABRREVIATIONS
EVAE EMERGENCY\.OIICLEACCESSEASEMENT

FIRE LADDER EASEMENT
PIE[ PRIVATE INGRESS/ EGRESS EASEMENT

PSDE PRIVATE STORM DRAINAGE EASEMENT

PRIVATE SANITARY SEWER EASEMENT

PWE PRIVATE WATER EASEMENT

SIDEWALK EASEMENT

UNOERGROUNDELECTRICAL EASEMENT

WATER LINE EASEMENT

DRIVEVAY
+

ONE LOT SUBDIVISION FOR CONDOMINIUM PURPOSES
EIGHT (8) RESIDENTIAL CONDOMINIUM UNITS
COMMENCING ON THE WESTERLY LINE OF POMEROY AVENUE, DISTANT THEREON 251.79 FEET SOUTHERLY FROM THE INTERSECTION

OF SAID LINE OF POMEROY AVENUE WITH THE SOUTHEAL Y LINE OF SANTA CLARA-SAN FRANCISCO HIGHWAY, AND RUNNING THENCE SOUTHERLY ALONG SAID LINE OF POMEROY AVENUE 80 FEET; THENCE SOUTH 89" 45' WEST 173 FEET; THENCE NORTHERLY AND PARALLEL WITH SAID LINE OF POMEROY AVENUE 60 FEET; THENCE NORTH 89' 45' EAST 173 FEET TO THE POINT OF BEGINNING AND

BEGINNING AT THE POINT OF INTERSECTION OF THE SOUTHERLY LINE OF THE SANTA CLARA-SAN FRANCISCO HIGHWAY AS NOW EXISTING 100 FEET WIDE WITH THE WESTERLY LINE OF POMEROY AVENUE; THENCE, RUNNING SOUTHERLY AND ALONG THE WE STEALY LINE OF POMEROY AVENUE 251.79 FEET TO THE TRUE POINT OF BEGINNING; THENCE, WESTERLY AND PARALLEL WITH SAID SOUTHERLY LINE OF SANTA CLARA-SAN FRANCISCO HIGHWAY 173 FEET TO A POINT; THENCE, NORTH ERi.. Y AND PARALLEL WITH THE WESTERLY LINE OF POMEROY AVENUE 85 FEET TOA POINT; THENCE, EASTERLY AND PARALLEL WITHTHE SOUTHERLY LINE OF SANTA CLARA-SAN FRANCISCO HIGHWAY 173 FEET TO THE WESTERLY LINE OF POMEROY AVENUE; THENCE, SOUTHEAL Y AND ALONG SAID WE STEALY LINE OF POMEROY AVENUE, 85 FEET TO THE POINT OF BEGINNING. BEING A PORTION OF QUITO RANCHO. \
\
I

LYNG ENTIRELY WITHIN THE

CITY OF SANTA CLARA SANT A CLARA COUNTY ST ATE OF CALIFORNIA OCTOBER2020

SMP ENGINEERS
1534 CAROB LANE
LOS ALTOS, CA 9402 4
·=--
-=-
. ::::,_-

PROJECT SITE
!
l

1. OWNERS ANO DEVELOPERS· POMEROY 1530-15 40 PROPERTY

OMID SHAKERI
2898.JOSEPHA\;£.

CAMPBELL, CA 95008
J. APNI 290 - 02- 096 and 290 - 02- 097
4, EXISTING ZONE, RJ

5. EXISTING USE: RESIDENTIAL
6 . PROPOSED USE: RESIDENTIAL, 8 CONOOMINUM UNITS
7, FLOODING: FLOOD ZONE XSOO

9. EXISTING USE OF ADJACENT PROPERTIES: RESIOEN"TlAL/ APARTMENTS 11 . FIRE PROTECTION: CITY OF SANTA CLARA FIRE DEPARTMENT

12. STORM/SANITARY SEWER: CITY OF SANTA CLARA

13. POWER ANO GAS: CITY OF SANTA CLARA/PACIFIC GAS AND ELECTRIC 14, TELEPHONE: PACIFIC BELL

LOCATION MAP
N.T.S.

SHEET INDEX:
15, STREET TREES: NEW STREET TREES 'MLL BE PLANTED PER CITY SA"TlSFACTION, 'M TH A MINIMUM OF 10' FROM EXISTING AND NEW CITY WATERS & SANITARY SEWER FACIU"TlES.

16. AREA OF SUB-.ECT PROPERTY: 0.48 2 ACRES (21,000 SQUARE FEET) 17, ALL EXISTING STRUCTURES ARE TO BE REMOVED PRIOR TO RECORD OF FINAL MAP.

6.00" UGEE
STD ,..

EX. WA~R SS Q.___ NEW SD
T YPI CAL POMEROY A VE. SECT I ON (6 0 .00' R - 0 - W)

E NG I N EE RS

C IV IL ENGINEE RS
ECCO Bu ilders , INC.

Omid Shake ri
12280 Saratogo- SunnyvaleRd.

Suite 109
Saratoga, CA 95070
Phone: (408)666 - 6556
Emat omidOeccobuilders.com
10/21/2020
Scale,
1" = 20 '
Prepared b:,:

S.R
-· 220050
1 OF1
TM
From: HUANG LA
To: Elaheh Kerachian
Subject: 1530-1540 Pomeroy Avenue Residential Project
Date: Monday, June 7, 2021 9:50:10 AM
Mayor and Members of the City Council and the Planning Commission.

I am Hung Le,23- year home owner of 1436 Pomeroy Avenue Santa Clara, opposing the construction of multi-story townhomes at those addresses to replace current 2 single homes.

The new construction would destroy our single-home neighborhood culture, impair the health, safety, and quality of life in our area and are inconsistent with the General plan and Regional Traffic objectives for the El Camino area.

Noises, parking, traffic and safety would be major concerns of our neighborhood living in this narrow strip of Pomeroy Avenue between Granada Avenue and El Camino Real.

Therefore please say NO to this new proposed construction.

Thank you
Hung Le
Sent from Mail
for Windows 10

\
BASIS OF BEARINGS:

THE 8£ARING N. 0,,4'00' w. OF THE CfNTERLINE or POMEROY AV£., AS SHO'lfl UPON CfRTAIN lRACT NO. 2908, RE:CffiOE □ IN BOOK 140CJ"MAf'S AT PAG£ 31, W"5 TAKEN AS BASIS Of BEARINGSfffiTHISSURVEY MAf',
REFERENCED CITY OF SANTA CLARA B.M
BM # E- 1J Q-IISI.IO CROSS (fl SE B(U IN lRAFFlC UQ-11 BASI:, AT NW CffiNER OF ELCAUINORE:AL&POUEROYA\IE. EL: 91.06'(N A\08

AREA TABLE

DESCRIPTION AREA AREA
(SOFT.) (ACRES)
UNIT 1 863 0.020
UNIT2 848 0.019
UNIT3 848 0.019
UNIT4 848 0.019
UNITS 848 0.019
UNITS 863 0.020
UNITA 1,574 0.036
UNITB 1,574 0.036
PRIVATE SPACE UNIT A 500 0.011
PRIVATE SPACE UNITB 517 0.012
COMMON AREA 11 ,717 0.269
LOT 1 (COMMON LOT) 21,000 0.482 BOUNOAR
• 93 .54
LEGEND
- - -- - - SlREET CENTER LINE
------ DISi1NCTIVE BORDER LINE
-------- PROPOSED UNIT LINE
--- - -- EXISllNG LOT LINE TO BE REM0',£0
---- EASEMENTLINE
APN# 290-02-092
009267
"

ABRREVIATIONS
'"'
EMERa:NCYVEHIO.EACCfSS EASEMENT
"-' FIRE LADDER EASEMENT
PIEE PRIVATEINGRE:SS/EGRESSEASEMENT

PSDE PRIVATE STORM DRAINAGE EASEMENT
PSSE PRIVATESANITARYSO'l[REASEMENT
'"

PRIVATE WATER EASEMENT
S[ SIDEWALK EASEMENT

UNDERGROUNOEUCTRICALEASEMENT
.. , WATER LINE EASOIENT
I
f
Tentative Map

ONE LOT SUBDIVISION FOR CONDOMINIUM PURPOSES
EIGHT (8) RESIDENTIAL CONDOMINIUM UNITS
COMMENCING ON THE WESTERLY LINE OF POMEROY AVENUE, DISTANT THEREON 251.79 FEET SOLITHERL Y FROM THE INTERSECTION

OF SAID LINE OF POMEROY AVENUE WITH THE SOUTHERLY LINE OF SANTA CLARA-SAN FRANCISCO HIGHWAY, AND RUNNING THENCE SOUTHERLY ALONG SAID LINE OF POMEROY AVENUE 60 FEET; THENCE SOLITH 89" 4S WEST 173 FEET; THENCE NORTHERLY AND PARALLEL WITH SAID LINE OF POMEROY AVENUE 60 FEET; THENCE NORTH 89' 45' EAST 173 FEET TO THE POINT OF BEGINNING ANO BEGINNING AT THE POINT OF INTERSECTION OF THE SOLITHERL Y LINE OF THE SANTA CLARA-5AN FRANCISCO HIGHWAY AS NOW EXISTING 100 FEET WIDE WITH THE WESTERLY LINE OF POMEROY AVENUE; THENCE, RUNNING SOLITHERL Y AND ALONG THE WESTERLY LINE OF POMEROY AVENUE 251 .79 FEET TO THE TRUE POINT OF BEGINNING; THENCE, WESTERLY AND PARALLEL WITH SAID SOUTHERLY LINE OF SANTA CLARA-SAN FRANCISCO HIGHWAY 173 FEET TO A POINT; THENCE, NORTHERLY AND PARALLEL WITH THE WESTERLY LINE OF POMEROY AVENUE 65 FEET TO A POINT; THENCE, EASTERLY ANO PARALLEL WITH THE SOUTHERLY LINE OF SANTA CLARA-5AN FRANCISCO HIGHWAY 173 FEET TO THE WESTERLY LINE OF POMEROY AVENUE; THENCE, SOUTHERLY ANO ALONG SAID WESTERLY LINE OF POMEROY AVENUE, 65 FEET TO THE POINT OF BEGINNING. BEING A PORTION OF QUITO RANCHO. \
\
I

LYING ENTIRELY WITHIN THE

CITY OF SANTA CLARA SANTA CLARA COUNTY STATE OF CALIFORNIA OCTOBER 2020

SMP ENGINEERS
1534 CAROB LANE
LOS ALTOS, CA 94024
j
" ·=--
..... .!:"..:- ~ _/
J .... - ~
·-.:...-- ·
I
GENERAL NOTES AND STATEMENTS:

1. OWNERS AND DEVELOPERS· POMEROY 1530- 1540 PROPERTY

OMID SHAKERI
2898.Kl5EPHAVE .

CAf.APBELL,CA95DD8
J. APN# 290- 02- 096 ond 290 - 02- 097

4. EXISnNG ZONE: RJ

6. PROPOSED USE: RESIDENTIAL, 8 CONDOMINUM UNITS

7. FLOODING: FLOOD ZONE XSOO

9. EXISnNG USE OF ADJACENT PROPERTIES: RESIDENTI AL/ APARTMENTS

11. FIRE PROTECTION: CITY OF SANTA CLARA FIRE DEPARTMENT

12. STORM/SANITARY SEWER: CITY OF SANTA CLARA

13. POWER ANO GAS: CITY OF SANTA CLARA/PACIFIC GAS AND ELECTRIC

14. TELEPHONE: PACIFIC BELL

LOCATION MAP
N.T.S.

SHEET INDEX:

15. STREET TREES: NEW STREET TREES WILL BE PLANTED PER CITY SATISFACnON, ,..,,TH A MINIMUM OF 10' FROM EXISTING AND NEW CI TY WATERS &: SANITARY SEWER FACIUTIES.

16. AREA OF SUBJECT PROPERTY: D.482 ACRES {21,DOO SQUARE FEET)

17. ALL EXISn NG STRUCTIJRES ARE TO BE REMOVED PRIOR TO RECORD OF FINAL MAP

6.00'UGEE

DEDICATION
I ---l ~ 1.50' :.:tc~~~SEMEN T
~I •ll--"'"'-l- --""' - -1--- ~-l--""-1
I I
~ NEW SD PORllONSOFPOME~

E N G I NEE RS

C I V IL ENG INEERS
ECCO Bulld ers, INC,
Om id Shakeri
12280So rotogo-S unny.oleRd.

Suite109
5orol0<,lo,CA95070
Phone:(40 8)666-6556
Emoil: omidOeccobuilders.com
Scolw:0/21/202 0
1~ = 20'
Prepo,edb)(
Ched<edb)(
S.R
Job f.
220050
10F1
TM

← All documents from this meeting