Project List
LSR-C13-FY22/23-5019-001
FY 22/23
Project Details

ID

Title

Description

Location
Est. Completion Useful Life

Assem.

Senate

Elements Pre-Con Con Min Max
PP001 Annual Street
Maintenance and
Rehabilitation
Program Project
Pavement maintenance and
rehabilitation for the existing
street. The work includes
treating the pavement with
asphalt concrete, slurry seal, or
cape seal. Ancillary work may
include removal and
replacement of failed pavement
areas, and reconstruction of
curbs, gutters, sidewalks, ADA
curb ramps, traffic striping,
markings, roadway legends and
traffic detection loops as
needed.

The following locations identified are subject to be
changed:

• Stevens Creek Boulevard (Redwood Ave. to Cypress Ave.) [STCRBL 00001]

• Stevens Creek Boulevard (Cypress Ave. to Saratoga Ave.) [STCRBL 00002]

• Stevens Creek Boulevard (Saratoga Ave. to Cupertino City Limit)
[STCRBL 00003]

• Winchester Boulevard (Stevens Creek Blvd. to Forest Ave.) [WNCHST 00001]

• Winchester Boulevard (Forest Ave. to Fernwood Ave.)
[WNCHST 00002]

• Winchester Boulevard (Fernwood Ave. to Pruneridge Ave.) [WNCHST 00004]

• Winchester Boulevard (Pruneridge Ave. to Dolores Ave.) [WNCHST 00005]

• Winchester Boulevard (Dolores Ave. to Tulip Dr.)
[WNCHST 00006]

• Winchester Boulevard (Tulip Dr. to Newhall St.)
[WNCHST 00007]

05/2022 12/2022 3 20 25 10 Complete
Streets,
Sustainability
Senate Bill (SB) 1 Proposed Project List for FY 2022-23 ATTACHMENT

Page 1 of 1 ends