RESOLUTION NO. 22-9092
A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA
TO ADOPT A LIST OF PROJECTS FUNDED BY SENATE BILL 1,
THE ROAD REPAIR AND ACCOUNTABILITY ACT, FOR FISCAL
YEAR 2022-23
BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017;
WHEREAS, SB 1 created the Road Maintenance and Rehabilitation Account (RMRA) to address basic road maintenance, rehabilitation, and critical safety needs on both the state highway and local streets and road system;
WHEREAS, SB1 requires cities to provide basic annual RMRA project reporting to the California Transportation Commission (CTC) in order to be eligible for RMRA funding; WHEREAS, the CTC adopted the Local Streets and Roads Funding Program Reporting Guidelines (Guidelines) that describe the general policies and procedures for carrying out the annual RMRA project reporting requirements for cities;
WHEREAS, SB 1 and the Guidelines require that cities must submit a List of Projects proposed to receive RMRA funding to the CTC each fiscal year and that the list of projects must be adopted by resolution by the City Council at a regular public meeting; WHEREAS, SB 1 and the Guidelines provide that the List of Projects shall not limit the flexibility of an eligible city to fund projects in accordance with local needs and priorities and an eligible city may make changes to the List of Projects;
WHEREAS, the City of Santa Clara must adopt a resolution to adopt a list of projects proposed to receive funding from the RMRA at a regular public meeting and the project list must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and Resolution/Adopt FY 2022-23 SB1 Project List
Rev: 11/22/17
WHEREAS, the City of Santa Clara affirms its commitment that the RMRA apportionments will be used and reported on as required by statute and the Guidelines .
NOW THEREFORE, BE IT FURTHER RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
1. That the foregoing recitals are true and correct.
2. That the City of Santa Clara adopts the Senate Bill (SB) 1 Proposed Project List for Fiscal Year 2022-23 as attached and incorporated herein by reference into this Resolut ion .
3. Effective date. This resolution shall become effective immediately .
I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED
AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA , AT A REGULAR MEETING THEREOF HELD ON THE 24TH DAY OF MAY , 2022, BY THE FOLLOWING VOTE :
AYES: COUNCILORS :
NOES : COUNCILORS :
ABSENT: COUNCILORS :
ABSTAINED : COUNCILORS:
Attachments incorporated by reference :
Becker , Chahal , Hardy , Jain , Park , Watanabe ,
and Mayor Gillmo r
None
None
None ~/J /)
ATTEST: _ __,__.__;:;.....=::;.......;..___;;;_:;........;..:=·......,,... _ _ __ _
NORAPIMENTEL,MM
ASSISTANT CITY CLERK
CITY OF SANTA CLARA
1. Senate Bill (SB) 1 Proposed Project List for FY 2022-23 Resolution/Adopt FY 2022-23 SB1 Project List
Rev: 11/22/17
Project Details
ID Title
PP001 • Annual Street
Maintenance and
Rehabilitation
Program Project
Description
Pavement maintenance and
rehabilitation for the existing
street. The work includes
treating the pavement with
asphalt concrete, slurry seal, or
cape seal. Ancillary work may
include removal and
replacement of failed pavement
areas, and reconstruction of
curbs, gutters, sidewalks, ADA
curb ramps, traffic striping,
markings, roadway legends and
traffic detection loops as
needed.
Location
Project List
LSR-C13-FY22/23-5019-001
FY 22/23
The following locations identified are subject to be
changed:
Stevens Creek Boulevard (Redwood Ave. to Cypress Ave.)
[STCRBL 00001]
Stevens Creek Boulevard (Cypress Ave. to Saratoga Ave.) [STCRBL 00002]
Stevens Creek Boulevard (Saratoga Ave. to Cupertino City Limit)
[STCRBL 00003]
Winchester Boulevard (Stevens Creek Blvd. to Forest Ave.) [WNCHST 00001]
Winchester Boulevard (Forest Ave. to Fernwood Ave.)
[WNCHST 00002]
Winchester Boulevard (Fernwood Ave. to Pruneridge Ave.) [WNCHST 00004]
Winchester Boulevard (Pruneridge Ave. to Dolores Ave.)
[WNCHST 00005]
Winchester Boulevard (Dolores Ave. to Tulip Dr.)
[WNCHST 00006]
Winchester Boulevard (Tulip Dr. to Newhall St.)
[WNCHST 00007]
Est. Comp_letion Useful Life
Pre-Con Con Min Max
05/2022 12/2022 3 20
Assem. Senate
25 10
Elements
Complete
Streets,
Sustainability
(/)
CD :::;
!l)
.-+
CD
OJ
en
OJ ..__..
->.
""'O .....
0 "Cl
0 (/)
CD
0. ""'O .....
..Q.
CD
~
r
QI
o' .....
71 -<
N
0 N
N
I
N w
""'O )>
!l) --l
co --l
CD )>
->. 0
o I
-s: _,_ m
z
--l