STADIUM

FORTY NINERS STADIUM MANAGEMENT COMPANY

LEVI'S STADIUM ON-CALL ELECTRICAL MAINTENANCE AND REPAIR

CONTRACT

KEY PROVISIONS
CONTRACT TITLE Levi's Stadium Electrical Maintenance and Repair Services - MANCO
CONTRACT NUMBER 10051-B
PURPOSE Utilize for on-call electrical maintenance and
repair services at the Levi's Stadium.

CONTRACT TERM May 1, 2021 through April 30, 2024 with an option to renew for two additional one year
periods.

TOTAL CONTRACT VALUE Total contract value is $750,000 for 3 years.

Nat to Exceed Amount for each contract year is
$250,000. SCSA Budget approval for subsequent
years is required.

CONTRACTOR Cupertino Electric, Inc.
1132 N. 7th Street
San Jose, CA 95112
CONTRACTOR CONTACT Geoffrey Nocon
Email: Geoffrey [email protected]
Tel: 408-808-8284
Cell: 408-771-6747

1. Authorized user shall request quotes
ORDER PROCESS 2. Upon verification and approval, Contractor shall be awarded the work via a fuliy
executed Task Order based on the
Contractor's response, availability, cost and
4900 Marie P. DeBartolo Way I Santa Clara, CA 95054
expertise. Task Order will be executed by
EVP & General Manager of Stadium
Operations.

3. Approved Task Order issued to Contractor by
Project Manager.

4. Each Task Order shall have a not to exceed
amount prior to work being authorized and must
be tracked against contract funding threshold to
ensure the total is under budget.

AUTHORIZED USER ENGINEERING DEPARTMENT
STADIUM MANAGER Ryan Van Maarth
CONTACT /ADMINISTRATOR VP of Stadium Operations and Strategic Planning 4900 Marie P DeBartolo Way
Santa Clara, CA 95054
Email: Ry:[email protected]
Tel: 206-550-8030
TAX STATUS AND PAYMENT Goods - Taxable
TERMS Services - Non-taxable
Net 30 days from receipt of undisputed invoice.

SOLICITATION REFERENCE RFP FY20-0001
SCSAAPPROVAL DATE April 20, 2021 Board Meeting

PREVAILING WAGE YES

REQUIRED
DIR REPORTING Registered on May 19, 2021
PERFORMANCE AND Submitted

PAYMENT BONDS
2 Contract Number: 10051-B

FORTY NINERS STADIUM MANAGEMENT COMPANY LLC

LEVI'S STADIUM ON-CALL ELECTRICAL MAINTENANCE AND REPAIR CONTRACT

1. PARTIES AND DATE.

This Contract is made and entered into this First day of May, 2021 by and between the FORTY NINERS STADIUM MANAGEMENT COMPANY LLC, a Delaware limited liability company ("Stadium Manager") and CUPERTINO ELECTRIC, INC., a Delaware Corporation with its principal place of business at 1132 North Seventh Street. San Jose, CA 95112 ("Contractor").

Stadium Manager and Contractor are sometimes individually referred to as "Party" and collectively as "Parties" in this Contract.

2. RECITALS.

2.1 Stadium Manager. Stadium Manager seeks to contract for services necessary to achieve its purpose.

2.2 Contractor. Contractor desires to perform and assume responsibility for the provision of certain maintenance and repair services required by the Stadium Manager on the terms and conditions set forth in this Contract and in the task order(s) to be issued pursuant to this Contract and executed by the Stadium Manager and Contractor ("Task Order"). Contractor represents that it is duly licensed and experienced in providing Levi's Stadium On-Call Stadium Electrical related maintenance and repair services, that it and its employees or subcontractors have all necessary licenses and permits to perform the services in the State of California, and that it is familiar with the plans of Stadium Manager. The following license classifications are required for this Project: C-7 Low Voltage Systems and C-10 Electrical Contractor.

2.3 Project. Stadium Manager desires to engage Contractor to render such services for the On-Call Stadium Electrical Maintenance and Repair ("Project") as set forth in this Contract on an on-call, as-needed basis. There is no guarantee of any of work under this Contract other than what is specified herein or that the not-to-exceed compensation amount set forth herein will be spent.

2.4 Project Documents & Certifications. Contractor has obtained, and delivers concurrently herewith, a performance bond, a payment bond, and all insurance documentation, as required by the Contract.

3. TERMS

3.1 Incorporation of Documents. This Contract includes and hereby incorporates in full by reference the following documents, including all exhibits, drawings, specifications and documents therein, and attachments and addenda thereto:
• Scope of Work (Exhibit "A")
• Plans and Specifications (Exhibit "B")
• Special Conditions (Exhibit "C")
• Contractor's Certificate Regarding Workers' Compensation (Exhibit "D") • Public Works Contractor Registration Certification (Exhibit "E")

Page 1 of 40 ends

Contract Number: 10051-B
• Payment and Performance Bonds (Exhibit "F")
• Rate Schedule (Exhibit "G")
• Sample Task Order Form (Exhibit "H")
• Addenda
• Change Orders executed by the Stadium Manager
• 2018 Edition of the Standard Specifications for Public Works Construction (The Greenbook), Excluding Sections 1-9
• Notice Inviting Bids, if any
• Instructions to Bidders, if any
• Contractor's Bid, if any

3.2 Contractor's Basic Obligation: Scope of Work. Contractor promises and agrees, at its own cost and expense, to furnish to the Stadium Manager all labor, materials, tools, equipment, services, and incidental and customary work necessary for the Project (hereinafter sometimes referred to as the "Work"). The type of Work to be provided is described in Exhibit "A" attached hereto and incorporated herein by reference and in the individual Task Orders issued by the Stadium Manager. No Work shall be performed unless authorized by this Contract and by a fully executed Task Order in the form attached hereto as Exhibit "H". All Work shall be subject to, and performed in accordance, with this Contract, any relevant Task Order, the exhibits attached hereto and incorporated herein by reference, and all applicable local, state and federal laws, rules and regulations. Special Conditions, if any, relating to the Work are described in Exhibit "C" attached hereto and incorporated herein by this reference.

3.2.1 Change in Scope of Work. Any change in the scope of the Work, method of performance, nature of materials or price thereof, or any other matter materially affecting the performance or nature of the Work shall not be paid for or accepted unless such change, addition or deletion is approved in writing by a valid change order executed by the Stadium Manager.

Should Contractor request a change order due to unforeseen circumstances affecting the performance of the Work, such request shall be made within five (5) business days of the date such circumstances are discovered or shall waive its right to request a change order due to such circumstances. If the Parties cannot agree on any change in price required by such change in the Work, the Stadium Manager may direct the Contractor to proceed with the performance of the change on a time and materials basis.

3.2.2 Substitutions/"Or Equal". Pursuant to Public Contract Code Section 3400(b), the Stadium Manager may make a finding that designates certain products, things, or services by specific brand or trade name. Unless specifically designated in this Contract, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words "or equal."
Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in this Contract. However, the Stadium Manager may have adopted certain uniform standards for certain materials, processes and articles. Contractor shall submit requests, together with substantiating data, for substitution of any "or equal" material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the repair schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract.

Provisions regarding submission of "or equal" requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed "or equal" substitution request

Page 2 of 40 ends

Contract Number: 10051-8
is rejected, Contractor shall be responsible for providing the specified material, process or article.

The burden of proof as to the equality of any material, process or article shall rest with Contractor.

The Stadium Manager has the complete and sole discretion to determine if a material, process or article is an "or equal" material, process or article that may be substituted.

Data required to substantiate requests for substitutions of an "or equal" material, process or article data shall include a signed affidavit from Contractor stating that, and describing how, the substituted "or equal" material, process or article is equivalent to that specified in every way except as listed on the affidavit. Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted "or equal" material, process or article, and substantiates that it is an "or equal" to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted "or equal" material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the Stadium Manager in a timely fashion will result in the rejection of the proposed substitution.

Contractor shall bear all of the Stadium Manager's costs associated with the review of substitution requests. Contractor shall be responsible for all costs related to a substituted "or equal" material, process or article. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code Section 3400.

3.3 Period of Performance and Liquidated Damages. The term of this Contract shall commence on the date first set forth above and expire on April 30, 2024, unless earlier terminated as provided herein. Contractor shall complete the Work within the term of this Contract, and shall meet any other established schedules and deadlines set forth in the Task Order(s). All applicable indemnification provisions of this Contract shall remain in effect following the termination of this Contract. The Parties may, by mutual, written consent, further extend the term of this Contract for two (2) additional one (1) year periods. Pursuant to Government Code Section 53069.85, Contractor shall pay to the Stadium Manager as fixed and liquidated damages a fixed dollar amount per day for each and every calendar day of delay beyond any completion schedule, repair schedule or Project milestones established pursuant to the Contract and any Task Order(s). The daily liquidated damages amount will be determined for each separate Task Order and will be set forth in that Task Order.

3.4 Standard of Performance: Performance of Employees. Contractor shall perform all Work under this Contract in a skillful and workmanlike manner, and consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California. Contractor represents and maintains that it is skilled in the professional calling necessary to perform the Work. Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them. Finally, Contractor represents that it, its employees and subcontractors have all licenses, permits, qualifications and approvals of whatever nature that are legally required to perform the Work, including any required business license, and that such licenses and approvals shall be maintained throughout the term of this Contract. Contractor shall perform, at its own cost and expense and without reimbursement from the Stadium Manager, any work necessary to correct errors or omissions which are caused by Contractor's failure to comply with the standard of care provided for herein. Any employee who is determined by the Stadium Manager to be uncooperative, incompetent, a threat to the safety of persons or the Work, or any employee who fails or refuses to perform the Work in a manner acceptable to the Stadium Manager, shall be promptly removed from the Project by Contractor and shall not be re-employed on the Work.

Page 3 of 40 ends

Contract Number: 10051-8

3.5 Control and Payment of Subordinates: Contractual Relationship. Stadium Manager retains Contractor on an independent contractor basis and Contractor is not an employee of Stadium Manager. Any additional personnel performing the work governed by this Contract on behalf of Contractor shall at all times be under Contractor's exclusive direction and control. Contractor shall pay all wages, salaries, and other amounts due such personnel in connection with their performance under this Contract and as required by law. Contractor shall be responsible for all reports and obligations respecting such additional personnel, including, but not limited to: social security taxes, income tax withholding, unemployment insurance, and workers' compensation insurance.

3.6 Stadium Manager's Basic Obligation. Stadium Manager agrees to engage and does hereby engage Contractor as an independent contractor to furnish all materials and to perform all Work according to the terms and conditions herein contained for the sum set forth above. Except as otherwise provided in the Contract, the Stadium Manager shall pay to Contractor, as full consideration for the satisfactory performance by Contractor of the services and obligations required by this Contract, the below-referenced compensation in accordance with compensation provisions set forth in the Contract.

3. 7 Compensation and Payment.

3.7.1 Amount of Compensation. As consideration for performance of the Work required herein, Contractor shall receive compensation, including authorized reimbursements, for all Work rendered under this Contract at the rates set forth in Exhibit "G" attached hereto and incorporated herein by reference. The maximum compensation for Work to be provided pursuant to each Task Order shall be set forth in the relevant Task Order. The total compensation to be provided under this Contract by Stadium Manager to Contractor, in the aggregate, shall not exceed Two Hundred Fifty Thousand Dollars ($250,000.00) ("Total Contract Price") per contract year without the written approval of the Stadium Manager. The term for subsequent fiscal years shall be conditioned upon approval of the Stadium Authority budget for the applicable fiscal year that includes the amounts under this Contract.

3.7.2 Payment of Compensation. Contractor shall submit to Stadium Manager a monthly itemized statement which indicates Work completed by Contractor in a format acceptable to the Stadium Manager. The statement shall describe the amount of Work and supplies provided since the initial commencement date, or since the start of the subsequent billing periods, as appropriate, through the date of the statement. These statements shall be supported by evidence which is required by this Contract and such other documentation as the Stadium Manager may require. The Contractor shall certify that the Work for which payment is requested has been done and that the materials listed are stored where indicated.

3.7.3 Prompt Payment. Stadium Manager shall review and pay all progress payment requests in accordance with the provisions set forth in Section 20104.50 of the California Public Contract Code. However, no progress payments will be made for Work not completed in accordance with this Contract. Contractor shall comply with all applicable laws, rules and regulations relating to the proper payment of its employees, subcontractors, suppliers or others.

3.7.4 Deductions and Withholdings. The Stadium Manager may deduct from each progress payment an amount necessary to protect Stadium Manager from loss because of: (1) liquidated damages which have accrued as of the date of the application for payment; (2) any sums expended by the Stadium Manager in performing any of Contractor's obligations under the Contract which Contractor has failed to perform or has performed inadequately; (3) defective

Page 4 of 40 ends

Contract Number: 10051-B
Work not remedied; (4) stop notices as allowed by state law; (5) reasonable doubt that the Work can be completed for the unpaid balance of the Total Contract Price or within the scheduled completion date; (6) unsatisfactory prosecution of the Work by Contractor; (7) unauthorized deviations from the Contract; (8) failure of Contractor to maintain or submit on a timely basis proper and sufficient documentation as required by the Contract or by Stadium Manager during the prosecution of the Work; (9) erroneous or false estimates by Contractor of the value of the Work performed; (10) any sums representing expenses, losses, or damages as determined by the Stadium Manager, incurred by the Stadium Manager for which Contractor is liable under the Contract; and (11) any other sums which the Stadium Manager is entitled to recover from Contractor under the terms of the Contract or pursuant to state law, including Section 1727 of the California Labor Code. The failure by the Stadium Manager to deduct any of these sums from a progress payment shall not constitute a waiver of the Stadium Manager's right to such sums.

3.7.5 Substitutions for Contract Deductions and Withholdings. In accordance with California Public Contract Code Section 22300, the Stadium Manager will permit the substitution of securities for any monies withheld by the Stadium Manager to ensure performance under the Contract. At the request and expense of Contractor, securities equivalent to the amount withheld shall be deposited with the Stadium Manager, or with a state or federally chartered bank in California as the escrow agent, and thereafter the Stadium Manager shall then pay such monies to Contractor as they come due. Upon satisfactory completion of the Contract, the securities shall be returned to Contractor. For purposes of this Section and Section 22300 of the Public Contract Code, the term "satisfactory completion of the contract" shall mean the time the Stadium Manager has issued written final acceptance of the Work and filed a Notice of Completion as required by law and provisions of this Contract. Contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereon. The escrow agreement used for the purposes of this Section shall be in the form provided by the Stadium Manager.

3.7.6 Title to Work. As security for partial, progress, or other payments, title to Work for which such payments are made shall pass to the Stadium Manager, or its designee, at the time of payment. To the extent that title has not previously been vested in the Stadium Manager, or its designee, by reason of payments, full title shall pass to the Stadium Manager, or its designee, at delivery of the Work at the destination and time specified in this Contract. Such transferred title shall in each case be good, free and clear from any and all security interests, liens, or other encumbrances. Contractor promises and agrees that it will not pledge, hypothecate, or otherwise encumber the items in any manner that would result in any lien, security interest, charge, or claim upon or against said items. Such transfer of title shall not imply acceptance by the Stadium Manager or its designee, nor relieve Contractor from the responsibility to strictly comply with the Contract, and shall not relieve Contractor of responsibility for any loss of or damage to items.

3.7.7 Labor and Material Releases. Contractor shall furnish Stadium Manager with labor and material releases from all subcontractors performing work on, or furnishing materials for, the Work governed by this Contract prior to final payment by Stadium Manager.

3.7.8 Prevailing Wages. Contractor is aware of the requirements of California Labor Code Section 1720 et seq., and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the Work is being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the total compensation

Page 5 of 40 ends

Contract Number: 10051-8
is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. Stadium Manager shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Contract. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Work available to interested parties upon request, and shall post copies at Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the Indemnified Parties (defined below) free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. Contractor and any subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

3.7.9 Apprenticeable Crafts. When Contractor employs workmen in an apprenticeable craft or trade, Contractor shall comply with the provisions of Section 1777.5 of the California Labor Code with respect to the employment of properly registered apprentices upon public works. The primary responsibility for compliance with said Section for all apprenticeable occupations shall be with Contractor. The Contractor or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

3. 7 .1 0 Hours of Work. Contractor is advised that eight (8) hours labor constitutes a legal day's work. Pursuant to Section 1813 of the California Labor Code, Contractor shall forfeit a penalty of $25. 00 per worker for each day that each worker is permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week, except when payment for overtime is made at not less than one and one-half (1-1/2) times the basic rate for that worker.

3. 7.11 Payroll Records. Contractor and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of Contractor in the manner provided in Labor Code Section 1776. In the event of noncompliance with the requirements of this Section, Contractor shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such Contractor must comply with this Section. Should noncompliance still be evident after such 10-day period, Contractor shall, as a penalty, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this Section is on Contractor. The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code Section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

3.7.12 Contractor and Subcontractor Registration. Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the

Page 6 of 40 ends

Contract Number: 10051-B
Department of Industrial Relations. No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. Contractor is directed to review, fill out and execute the Public Works Contractor Registration Certification attached hereto as Exhibit "E" prior to contract execution. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

3.7.13 Labor Compliance: Stop Orders. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. It shall be the Contractor's sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor that affect Contractor's performance of Work, including any delay, shall be Contractor's sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered Contractor caused delay subject to any applicable liquidated damages and shall not be compensable by the Stadium Manager. Contractor shall defend, indemnify and hold the Indemnified Parties (defined below) free and harmless from any claim or liability arising out of stop orders issued by the Department of Industrial Relations against Contractor or any subcontractor.

3.8 Performance of Work; Jobsite Obligations.

3.8.1 Water Quality Management and Compliance, if Applicable.

3.8.1.1 Water Quality Management and Compliance. Contractor shall keep itself and all subcontractors, staff, and employees fully informed of and in compliance with all local, state and federal laws, rules and regulations that may impact, or be implicated by the performance of the Work including, without limitation, all applicable provisions of the Federal Water Pollution Control Act (33 U.S.C. §§ 1300); the California Porter-Cologne Water Quality Control Act (Cal Water Code §§ 13000-14950); local ordinances regulating discharges of storm water; and any and all regulations, policies, or permits issued pursuant to any such authority regulating the discharge of pollutants, as that term is used in the Porter-Cologne Water Quality Control Act, to any ground or surface water in the State.

3.8.1.2 Compliance with the Statewide Construction General Permit. Contractor shall comply with all conditions of the most recent iteration of the National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity, issued by the California State Water Resources Control Board ("Permit"). It shall be Contractor's sole responsibility to file a Notice of Intent and procure coverage under the Permit for all construction activity which results in the disturbance of more than one acre of total land area or which is part of a larger common area of development or sale. Prior to initiating work, Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (SWPPP) as required by the Permit. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, and monitoring and reporting requirements as required by the Permit. The Permit requires the SWPPP to be a "living document" that changes as necessary to meet the conditions and requirements of the job site as it progresses through difference phases of construction and is subject to different weather conditions. It shall be Contractor's sole responsibility to update the SWPPP as necessary to address conditions at the project site.

Page 7 ends

Contract Number: 10051-B

3.8.1.3 Other Water Quality Rules Regulations and Policies.

Contractor shall comply with the lawful requirements of any applicable municipality, drainage Stadium Manager, or local agency regarding discharges of storm water to separate storm drain systems or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.

3.8.1.4 Cost of Compliance. Storm, surface, nuisance, or other waters may be encountered at various times during repair of the Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.

3.8.1.5 Liability for Non-Compliance. Failure to comply with the Permit is a violation of federal and state law. Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to defend, indemnify and hold harmless the Indemnified Parties (defined below) for any alleged violations. In addition, Stadium Manager may seek damages from Contractor for any delay in completing the Work in accordance with the Contract, if such delay is caused by or related to Contractor's failure to comply with the Permit.

3.8.1.6 Reservation of Right to Defend. Stadium Manager reserves the right to defend any enforcement action brought against the Stadium Manager for Contractor's failure to comply with the Permit or any other relevant water quality law, regulation, or policy.

Pursuant to the indemnification provisions of this Contract, Contractor hereby agrees to be bound by, and to reimburse the Stadium Manager for the costs (including the Stadium Manager's attorney's fees) associated with, any settlement reached between the Stadium Manager and the relevant enforcement entity.

3.8.1.7 Training. In addition to the standard of performance requirements set forth in paragraph 3.4, Contractor warrants that all employees and subcontractors shall have sufficient skill and experience to perform the Work assigned to them without impacting water quality in violation of the laws, regulations and policies described in paragraph 3.8.1. Contractor further warrants that it, its employees and subcontractors will receive adequate training, as determined by Stadium Manager, regarding the requirements of the laws, regulations and policies described in paragraph 3.8.1 as they may relate to the Work provided under this Contract. Upon request, Stadium Manager will provide the Contractor with a list of training programs that meet the requirements of this paragraph.

3.8.2 Safety. Contractor shall execute and maintain its work so as to avoid injury or damage to any person or property. Contractor shall comply with the requirements of the specifications relating to safety measures applicable in particular operations or kinds of work. In carrying out its Work, Contractor shall at all times be in compliance with all applicable local, state and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the Work and the conditions under which the Work is to be performed. Safety precautions as applicable shall include, but shall not be limited to, adequate life protection and lifesaving equipment; adequate illumination for underground and night operations; instructions in accident prevention for all employees, such as machinery guards, safe walkways, scaffolds, ladders, bridges, gang planks, confined space procedures, trenching and shoring, fall protection and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and adequate facilities for the proper inspection and maintenance of all safety measures. Furthermore, Contractor shall prominently display the names and telephone numbers of at least two medical doctors practicing

Page 8 of 40 ends

Contract Number: 10051-8
in the vicinity of the Project, as well as the telephone number of the local ambulance service, adjacent to all telephones at the Project site.

3.8.3 Laws and Regulations. Contractor shall keep itself fully informed of and in compliance with all local, state and federal laws, rules and regulations in any manner affecting the performance of the Contract or the Work, including all Cal/OSHA requirements, and shall give all notices required by law. Contractor shall be liable for all violations of such laws and regulations in connection with Work. If Contractor observes that the drawings or specifications are at variance with any law, rule or regulation, it shall promptly notify the Stadium Manager in writing. Any necessary changes shall be made by written change order. If Contractor performs any work knowing it to be contrary to such laws, rules and regulations and without giving written notice to the Stadium Manager, Contractor shall be solely responsible for all costs arising therefrom.

Contractor shall defend, indemnify and hold Indemnified Parties (defined below) free and harmless, pursuant to the indemnification provisions of this Contract, from any claim or liability arising out of any failure or alleged failure to comply with such laws, rules or regulations.

3.8.4 Permits and Licenses. Contractor shall be responsible for securing Stadium Manager permits and licenses necessary to perform the Work described herein, including, but not limited to, any required business license. Any ineligible contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

3.8.5 Trenching Work. If the Total Contract Price exceeds $25,000 and if the Work governed by this Contract entails excavation of any trench or trenches five (5) feet or more in depth, Contractor shall comply with all applicable provisions of the California Labor Code, including Section 6705. To this end, Contractor shall submit for Stadium Manager's review and approval a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.

3.8.6 Hazardous Materials and Differing Conditions. As required by California Public Contract Code Section 7104, if this Contract involves digging trenches or other excavations that extend deeper than four (4) feet below the surface, Contractor shall promptly, and prior to disturbance of any conditions, notify Stadium Manager of: (1) any material discovered in excavation that Contractor believes to be a hazardous waste that is required to be removed to a Class I, Class II or Class Ill disposal site; (2) subsurface or latent physical conditions at the site differing from those indicated by Stadium Manager; and (3) unknown physical conditions of an unusual nature at the site, significantly different from those ordinarily encountered in such contract work. Upon notification, Stadium Manager shall promptly investigate the conditions to determine whether a change order is appropriate. In the event of a dispute, Contractor shall not be excused from any scheduled completion date and shall proceed with all Work to be performed under the Contract, but shall retain all rights provided by the Contract or by law for making protests and resolving the dispute.

3.8.7 Underground Utility Facilities. To the extent required by Section 4215 of the California Government Code, Stadium Manager shall compensate Contractor for the costs of:
(1) locating and repairing damage to underground utility facilities not caused by the failure of Contractor to exercise reasonable care; (2) removing or relocating underground utility facilities not indicated in the drawings; and (3) equipment necessarily idled during such work. Contractor

Page 9 of 40 ends

Contract Number: 10051-8
shall not be assessed liquidated damages for delay caused by failure of Stadium Manager to provide for removal or relocation of such utility facilities.

3.8.8 Air Quality. Contractor must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the California Air Resources Board (CARB). Although CARB limits and requirements are broader, Contractor shall specifically be aware of their application to "portable equipment", which definition is considered by CARB to include any item of equipment with a fuel~powered engine. Contractor shall indemnify the Indemnified Parties (defined below) against any fines or penalties imposed by CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Contractor, its subcontractors, or others for whom Contractor is responsible under its indemnity obligations provided for in this Contract.

3.8.9 State Recycling Mandates. Contractor shall comply with State Recycling Mandates. Any recyclable materials/debris collected by the contractor that can be feasibly diverted via reuse or recycling must be hauled by the appropriate handler for reuse or recycling.

3.9 Completion of Work. When Contractor determines that it has completed the Work required herein, Contractor shall so notify Stadium Manager in writing and shall furnish all labor and material releases required by this Contract. Stadium Manager shaH thereupon inspect the Work. If the Work is not acceptable to the Stadium Manager, the Stadium Manager shall indicate to Contractor in writing the specific portions or items of Work which are unsatisfactory or incomplete. Once Contractor determines that it has completed the incomplete or unsatisfactory Work, Contractor may request a reinspection by the Stadium Manager. Once the Work is acceptable to Stadium Manager, Stadium Manager shall pay to Contractor the Total Contract Price remaining to be paid, less any amount which Stadium Manager may be authorized or directed by law to retain. Payment of retention proceeds due to Contractor shall be made in accordance with Section 7107 of the California Public Contract Code.

3.10 Claims: Government Code Claim Compliance.

3.10.1 Arbitration.,_AII disputes between Contractor and Stadium Manager relating in any way to this Agreement or Services performed under this Agreement (including, but not limited to, claims for breach of contract, tort, discrimination, harassment and any violation of federal or state law, regulation or constitution) ("Arbitrable Claims") shall be resolved by binding arbitration under the Federal Arbitration Act, in conformity with the procedures of the California Arbitration Act (Cal. Code Civ. Proc. § 1280 et seq., including § 1283.05 and all of the Act's other mandatory and permissive rights to discovery). In addition to any other requirements imposed by law, the arbitrator selected shall be a retired California Superior Court Judge, or otherwise qualified individual to whom the parties mutually agree, and shall be subject to disqualification on the same grounds as would apply to a judge of such court. All rules of pleading (including the right of demurrer), all rules of discovery, all rules of evidence, all rights to resolution of the dispute by means of motions for summary judgment, judgment on the pleadings and all other dispositive motions, and judgment under Code of Civil Procedure § 631.8 shall apply and be observed.

Resolution of the dispute shall be based solely upon the law governing the claims and defenses pleaded, and the arbitrator may not invoke any basis other than such controlling law. The arbitrator shall have the immunity of a judicial officer from civil liability when acting in the capacity of an arbitrator, which immunity supplements any other existing immunity. Likewise, all communications during or in connection with the arbitration proceedings are privileged in accordance with Cal. Civil Code§ 47(b). As reasonably required to allow full use and benefit of

Page 10 of 40 ends

Contract Number: 10051-B
this agreement's modifications to the Act's procedures, the arbitrator shall extend the times set by the Act for the giving of notices and setting of hearings. Awards shall include the arbitrator's written reasoned opinion. The Parties understand and agree to this binding arbitration provision, and both Contractor and Stadium Manager give up their right to trial by jury of any claim they may have against each other.

3.11 Loss and Damage. Except as may otherwise be limited by law, Contractor shall be responsible for all loss and damage which may arise out of the nature of the Work agreed to herein, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the Work until the same is fully completed and accepted by Stadium Manager. In the event of damage proximately caused by an Act of God, as defined by Section 7105 of the Public Contract Code, the Stadium Manager may terminate this Contract pursuant to Section 3.17.3; provided, however, that the Stadium Manager needs to provide Contractor with only one (1) day advanced written notice.

3.12 Indemnification.

3.12.1 Scope of Indemnity. To the fullest extent permitted by law, Contractor shall defend, indemnify and hold the Stadium Manager, the Santa Clara Stadium Authority, the City of Santa Clara, their affiliates, and each of their respective officers, directors, managers, members, partners, owners, employees, agents and authorized volunteers, each tenant and event promoter of Levi's Stadium, and any mortgagee, bond trustee or other financial institution from time to time holding a line or indenture upon an interest in Levi's Stadium, and each of them (collectively, the "Indemnified Parties"), free and harmless from any and all claims, demands, causes of action, suits, actions, proceedings, costs, expenses, liability, judgments, awards, decrees, settlements, loss, damage or injury of any kind, in law or equity, to property or persons, including wrongful death, (collectively, "Claims") in any manner arising out of, pertaining to, or incident to any alleged acts, errors or omissions, or willful misconduct of Contractor, its officials, officers, employees, subcontractors, consultants or agents in connection with the performance of the Contractor's services, the Project, this Contract or any Task Order, including without limitation the payment of all consequential damages, expert witness fees and attorneys' fees and other related costs and expenses. Notwithstanding the foregoing, to the extent required by Civil Code Section 2782, Contractor's indemnity obligation shall not apply to liability for damages for death or bodily injury to persons, injury to property, or any other loss, damage or expense arising from the sole or active negligence or willful misconduct of the Indemnified Parties or the Indemnified Parties' agents, servants, or independent contractors who are directly responsible to the Indemnified Parties, or for defects in design furnished by those persons.

3.12.2 Additional Indemnity Obligations. Any defense to be provided by Contractor pursuant to any indemnification provision of this Agreement shall be by counsel approved by Stadium Manager, which approval shall not be unreasonably withheld. To the extent any of the lndemnitees incurs costs or expenses to enforce this indemnification (including attorneys' fees and expenses), Contractor shall reimburse the lndemnitee for such costs and expenses.

3.13 Insurance.

3.13.1 Time for Compliance. Contractor shall not commence Work under this Contract until it has provided evidence satisfactory to the Stadium Manager that it has secured all insurance required under this Section. In addition, Contractor shall not allow any subcontractor to commence work on any subcontract until it has provided evidence satisfactory to the Stadium

Page 11 of 40 ends

Contract Number: 10051-8
Manager that the subcontractor has secured all insurance required under this Section. Failure to provide and maintain all required insurance shall be grounds for the Stadium Manager to terminate this Contract for cause.

3.13.2 Minimum Requirements. Contractor shall, at its expense, procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the Work hereunder by Contractor, its agents, representatives, employees or subcontractors. Contractor shall also require all of its subcontractors to procure and maintain the same insurance for the duration of the Contract. Such insurance shall meet at least the following minimum levels of coverage:

3.13.2.1 Minimum Scope of Insurance. Coverage shall be at least as broad as the latest version of the following: (1) General Liability: Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01); (2) Automobile Liability:

Insurance Services Office Business Auto Coverage form number CA 00 01, code 1 (any auto); and (3) Wori<ers' Compensation and Employer's Liability: Workers' Compensation insurance as required by the State of California and Employer's Liability Insurance. Policies shall not contain exclusions contrary to this Contract.

3.13.2.2 Minimum Limits of Insurance. Contractor shall maintain limits no less than: (1) General Liability: $2,000,000 per occurrence and $4,000,000 aggregate for bodily injury, personal injury and property damage; (2) Automobile Liability: $2,000,000 per accident for bodily injury and property damage; and (3) Workers' Compensation and Employer's Liability: Workers' compensation limits as required by the Labor Code of the State of California.

Employer's Liability limits of $1,000,000 each accident, policy limit bodily injury or disease, and each employee bodily injury or disease. Defense costs shall be available in addition to the limits.

Notwithstanding the minimum limits specified herein, any available coverage shall be provided to the parties required to be named as additional insureds pursuant to this Contract.

3.13.3 Insurance Endorsements. The insurance policies shall contain the following provisions, or Contractor shall provide endorsements (amendments) on forms supplied or approved by the Stadium Manager to add the following provisions to the insurance policies:

3.13.3.1 General Liability. (1) Such policy shall give the Stadium Manager, Santa Clara Stadium Authority, Forty Niners Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers additional insured status using ISO endorsements CG20 10 07 04 plus CG20 37 07 04, or endorsements providing the exact same coverage, with respect to the Work or operations performed by or on behalf of Contractor, including materials, parts or equipment furnished in connection with such work; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the Stadium Manager, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor's scheduled underlying coverage. Any insurance or self-insurance maintained by the Stadium Manager, its officials, employees, agents and authorized volunteers shall be excess of Contractor's insurance and shall not be called upon to contribute with it.

Page 12 of 40 ends

Contract Number: 10051-B

3.13.3.2 Automobile Liability. (1) Such policy shall give the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers additional insured status with respect to the ownership, operation, maintenance, use, loading or unloading of any auto owned, leased, hired or borrowed by Contractor or for which Contractor is responsible; (2) all policies shall waive or shall permit Contractor to waive all rights of subrogation which may be obtained by the Contractor or any insurer by virtue of payment of any loss or any coverage provided to any person named as an additional insured pursuant to this Contract, and Contractor agrees to waive all such rights of subrogation; and (3) the insurance coverage shall be primary insurance as respects the Stadium Manager, its officials, employees, agents and authorized volunteers, or if excess, shall stand in an unbroken chain of coverage excess of Contractor's scheduled underlying coverage. Any insurance or self-insurance maintained by the Stadium Manager, its officials, employees, agents and authorized volunteers shall be excess of Contractor's insurance and shall not be called upon to contribute with it in any way.

3.13.3.3 Workers' Compensation and Employer's Liability Coverage.

The insurer shall agree to waive all rights of subrogation against the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy which arise from work performed by Contractor.

3.13.3.4 All Coverages. Each insurance policy required by this Contract shall be endorsed to state that: (1) coverage shall not be suspended, voided, reduced or canceled except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the Stadium Manager; and (2) any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the Stadium Manager, Santa Clara Stadium Authority, Forty Niners SC Stadium Company LLC and Forty Niners Football Company LLC and their respective officials, employees, agents and authorized volunteers.

3.13.3.5 Contractor's Equipment Insurance. Contractors Equipment Insurance applying to loss or damage on an "all risk" basis to any equipment, small tools, or other machinery whether owned, leased, rented, borrowed or otherwise in the care, custody and control of the Contractor for use in the performance of Work. The insurer shall agree to waive all rights of subrogation against the Stadium Manager, its officials, employees, agents and authorized volunteers for losses paid under the terms of the insurance policy.

3.13.4 Separation of Insureds; No Special Limitations. All insurance required by this Section shall contain standard separation of insureds provisions. In addition, such insurance shall not contain any special limitations on the scope of protection afforded to the Stadium Manager, its officials, employees, agents and authorized volunteers.

3.13.5 Deductibles and Self-Insurance Retentions. Any deductibles or self- insured retentions must be declared to and approved by the Stadium Manager. Contractor shall guarantee that, at the option of the Stadium Manager, either: (1) the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the Stadium Manager, its officials, employees, agents and authorized volunteers; or (2) the Contractor shall procure a bond or other financial guarantee acceptable to the Stadium Manager guaranteeing payment of losses and related investigation costs, claims and administrative and defense expenses.

Page 13 of 40 ends

Contract Number: 10051-8

3.13.6 Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating no less than A:VII, licensed to do business in California, and satisfactory to the Stadium Manager. Exception may be made for the State Compensation Insurance Fund when not specifically rated.

3.13. 7 Verification of Coverage. Contractor shall furnish Stadium Manager with original certificates of insurance and endorsements effecting coverage required by this Contract on forms satisfactory to the Stadium Manager. The certificates and endorsements for each insurance policy shall be signed by a person authorized by that insurer to bind coverage on its behalf, and shall be on forms supplied or approved by the Stadium Manager. All certificates and endorsements must be received and approved by the Stadium Manager before work commences. The Stadium Manager reserves the right to require complete, certified copies of all required insurance policies, at any time.

3.13.8 Subcontractors. All subcontractors shall meet the requirements of this Section before commencing Work. Contractor shall furnish separate certificates and endorsements for each subcontractor. Subcontractor policies of General Liability insurance shall name the Stadium Manager, its officials, employees, agents and authorized volunteers as additional insureds using form ISO 20 38 04 13 or endorsements providing the exact same coverage. All coverages for subcontractors shall be subject to all of the requirements stated herein except as otherwise agreed to by the Stadium Manager in writing.

3.13.9 Reporting of Claims. Contractor shall report to the Stadium Manager, in addition to Contractor's insurer, any and all insurance claims submitted by Contractor in connection with the Work under this Contract.

3.14 Bond Requirements.

3.14.1 Payment Bond. If required by law or otherwise specifically requested by Stadium Manager in Exhibit "C" attached hereto and incorporated herein by reference, Contractor shall execute and provide to Stadium Manager concurrently with this Contract a Payment Bond in an amount required by the Stadium Manager and in a form provided or approved by the Stadium Manager. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the Stadium Manager.

3.14.2 Performance Bond. If specifically requested by Stadium Manager in Exhibit "C" attached hereto and incorporated herein by reference, Contractor shall execute and provide to Stadium Manager concurrently with this Contract a Performance Bond in an amount required by the Stadium Manager and in a form provided or approved by the Stadium Manager. If such bond is required, no payment will be made to Contractor until the bond has been received and approved by the Stadium Manager.

3.14.3 Bond Provisions. Should, in Stadium Manager's sole opinion, any bond become insufficient or any surety be found to be unsatisfactory, Contractor shall renew or replace the effected bond within (ten) 10 days of receiving notice from Stadium Manager. In the event the surety or Contractor intends to reduce or cancel any required bond, at least thirty (30) days prior written notice shall be given to the Stadium Manager, and Contractor shall post acceptable replacement bonds at least ten (10) days prior to expiration of the original bonds. No further payments shall be deemed due or will be made under this Contract until any replacement bonds required by this Section are accepted by the Stadium Manager. To the extent, if any, that the Total Contract Price is increased in accordance with the Contract, Contractor shall, upon request

Page 14 of 40 ends

Contract Number: 10051-B
of the Stadium Manager, cause the amount of the bond to be increased accordingly and shall promptly deliver satisfactory evidence of such increase to the Stadium Manager. If Contractor fails to furnish any required bond, the Stadium Manager may terminate the Contract for cause.

3.14.4 Surety Qualifications. Only bonds executed by an admitted surety insurer, as defined in California Code of Civil Procedure Section 995.120, shall be accepted. If a California-admitted surety insurer issuing bonds does not meet these requirements, the insurer will be considered qualified if it is in conformance with Section 995.660 of the California Code of Civil Procedure, and proof of such is provided to the Stadium Manager.

3.15 Warranty. Contractor warrants all Work under the Contract (which for purposes of this Section shall be deemed to include unauthorized work which has not been removed and any non-conforming materials incorporated into the Work) to be of good quality and free from any defective or faulty material and workmanship. Contractor agrees that for a period of one year (or the period of time specified elsewhere in the Contract or in any guarantee or warranty provided by any manufacturer or supplier of equipment or materials incorporated into the Work, whichever is later) after the date offinal acceptance, Contractor shall within ten (10) days after being notified in writing by the Stadium Manager of any defect in the Work or non-conformance of the Work to the Contract, commence and prosecute with due diligence all Work necessary to fulfill the terms of the warranty at its sole cost and expense. Contractor shall act sooner as requested by the Stadium Manager in response to an emergency. In addition, Contractor shall, at its sole cost and expense, repair and replace any portions of the Work (or work of other contractors) damaged by its defective Work or which becomes damaged in the course of repairing or replacing defective Work. For any Work so corrected, Contractor's obligation hereunder to correct defective Work shall be reinstated for an additional one-year period, commencing with the date of acceptance of such corrected Work. Contractor shall perform such tests as the Stadium Manager may require to verify that any corrective actions, including, without limitation, redesign, repairs, and replacements comply with the requirements of the Contract. All costs associated with such corrective actions and testing, including the removal, replacement, and reinstitution of equipment and materials necessary to gain access, shall be the sole responsibility of Contractor. All warranties and guarantees of subcontractors, suppliers and manufacturers with respect to any portion of the Work, whether express or implied, are deemed to be obtained by Contractor for the benefit of the Stadium Manager, regardless of whether or not such warranties and guarantees have been transferred or assigned to the Stadium Manager by separate agreement and Contractor agrees to enforce such warranties and guarantees, if necessary, on behalf of the Stadium Manager. In the event that Contractor fails to perform its obligations under this Section, or under any other warranty or guaranty under this Contract, to the reasonable satisfaction of the Stadium Manager, the Stadium Manager shall have the right to correct and replace any defective or non-conforming Work and any work damaged by such work or the replacement or correction thereof at Contractor's sole expense. Contractor shall be obligated to fully reimburse the Stadium Manager for any expenses incurred hereunder upon demand.

3.16 Employee/Labor Certifications.

3.16.1 Contractor's Labor Certification. By its signature hereunder, Contractor certifies that he is aware of the provisions of Section 3700 of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Work. A certification form for this purpose, which is attached to this Contract as Exhibit "D" and incorporated herein by reference, shall be executed simultaneously with this Contract.

Page 15 of 40 ends

Contract Number: 10051-B

3.16.2 Equal Opportunity Employment. Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination.

3.16.3 Verification of Employment Eligibility. By executing this Contract, Contractor verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same.

3.17 General Provisions.

3.17 .1 Stadium Manager's Representative. The Stadium Manager hereby designates the General Manager, or his or her designee, to act as its representative for the performance of this Contract ("Stadium Manager's Representative"). Stadium Manager's Representative shall have the power to act on behalf of the Stadium Manager for all purposes under this Contract. Contractor shall not accept direction or orders from any person other than the Stadium Manager's Representative or his or her designee.

3.17 .2 Contractor's Representative. Before starting the Work, Contractor shall submit in writing the name, qualifications and experience of its proposed representative who shall be subject to the review and approval of the Stadium Manager ('"Contractor's Representative").

Following approval by the Stadium Manager, Contractor's Representative shall have full authority to represent and act on behalf of Contractor for all purposes under this Contract. Contractor's Representative shall supervise and direct the Work, using his best skill and attention, and shall be responsible for all means, methods, techniques, sequences and procedures and for the satisfactory coordination of all portions of the Work under this Contract and as described in the relevant Task Order. Contractor's Representative shall devote full time to the Project and either he or his designee, who shall be acceptable to the Stadium Manager, shall be present at the Work site at all times that any Work is in progress and at any time that any employee or subcontractor of Contractor is present at the Work site. Arrangements for responsible supervision, acceptable to the Stadium Manager, shall be made for emergency Work which may be required. Should Contractor desire to change its Contractor's Representative, Contractor shall provide the information specified above and obtain the Stadium Manager's written approval.

3.17.3 Termination. This Contract may be terminated by Stadium Manager at any time, either with our without cause, by giving Contractor three (3) days advance written notice. In the event of termination by Stadium Manager for any reason other than the fault of Contractor, Stadium Manager shall pay Contractor for all Work performed up to that time as provided herein.

In the event of breach of the Contract by Contractor, Stadium Manager may terminate the Contract immediately without notice, may reduce payment to Contractor in the amount necessary to offset Stadium Manager's resulting damages, and may pursue any other available recourse against Contractor. Contractor may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, Stadium Manager may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated.

Further, if this Contract is terminated as provided, Stadium Manager may require Contractor to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by Contractor in connection with its performance of this Contract.

Page 16 of 40 ends

Contract Number: 10051-8

3.17.4 Contract Interpretation. Should any question arise regarding the meaning or import of any of the provisions of this Contract or written or oral instructions from Stadium Manager, the matter shall be referred to Stadium Manager's Representative, whose decision shall be binding upon Contractor.

3.17 .6 Notices. All notices hereunder and communications regarding interpretation of the terms of the Contract or changes thereto shall be directed to the regularly­ monitored electronic mail address, read receipt requested, of such party as follows:

CONTRACTOR:

Attn: Geoffrey Nocon
Cupertino Electric, Inc.

Email: [email protected]
STADIUM MANAGER:

General Manager
Forty Niners Stadium Management Company LLC
[email protected]
With copy to:

Legal Affairs
Forty Niners Stadium Management Company LLC
[email protected]
Any such notice or communication shall be deemed to have been given on the day such notice or communication is sent electronically, provided the sender has received a confirmation of such electronic transmission. A Party may, for purposes of this Agreement, change its email address or the person to whom a notice or other communication is marked to the attention of, by giving notice of such change to the other Party pursuant to this Section 3.17.6.

3.17. 7 Time of Essence. Time is of the essence in the performance of this Contract.

3.17.8 Assignment Forbidden. Contractor shall not, either voluntarily or by action of law, assign or transfer this Contract or any obligation, right, title or interest assumed by Contractor herein without the prior written consent of Stadium Manager. If Contractor attempts an assignment or transfer of this Contract or any obligation, right, title or interest herein, Stadium Manager may, at its option, terminate and revoke the Contract and shall thereupon be relieved from any and all obligations to Contractor or its assignee or transferee.

3.17 .9 No Third-Party Beneficiaries. There are no intended third-party beneficiaries of any right or obligation assumed by the Parties.

3.17 .10 Laws, Venue, and Attorneys' Fees. This Contract shall be interpreted in accordance with the laws of the State of California. If any action is brought to interpret or enforce any term of this Contract, the action shall be brought in a state or federal court situated in the County of Santa Clara, State of California.

Page 17 of 40 ends

Contract Number: 10051-B

3.17.11 Counterparts. This Contract may be executed in counterparts, each of which shall constitute an original.

3.17.12 Successors. The Parties do for themselves, their heirs, executors, administrators, successors, and assigns agree to the full performance of all of the provisions contained in this Contract.

3.17.13 [Reserved]

3.17 .14 Solicitation. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, Stadium Manager shall have the right to terminate this Contract without liability.

3.17.15 Conflict of Interest. Contractor maintains and warrants that it has not employed nor retained any company or person, other than a bona fide employee working solely for Contractor, to solicit or secure this Contract. Further, Contractor warrants that it has not paid nor has it agreed to pay any company or person, other than a bona fide employee working solely for Contractor, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Contract. For breach or violation of this warranty, Stadium Manager shall have the right to rescind this Contract without liability. For the term of this Contract, no official, officer or employee of Stadium Manager, during the term of his or her service with Stadium Manager, shall have any direct interest in this Contract, or obtain any present or anticipated material benefit arising therefrom. In addition, Contractor agrees to file, or to cause its employees or subcontractors to file, a Statement of Economic Interest with the Stadium Manager's Filing Officer as required under state law in the performance of the Work.

3.17.16 Certification of License.

3.17.16.1 Contractor certifies that as of the date of execution of this Contract, Contractor has a current contractor's license of the classification indicated below under Contractor's signature.

3.17.16.2 Contractors are required by law to be licensed and regulated by the Contractors' State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a contractor may be referred to the Registrar, Contractors' State License Board, P.O.

Box 26000, Sacramento, California 95826.

3.17.17 Authority to Enter Contract. Each Party warrants that the individuals who have signed this Contract have the legal power, right and authority to make this Contract and bind each respective Party.

3.17.18 Entire Contract: Modification. This Contract contains the entire agreement of the Parties with respect to the subject matter hereof, and supersedes all prior

Page 18 of 40 ends

Contract Number: 10051-B
negotiations, understandings or agreements. This Contract may only be modified by a writing signed by both Parties.

3.17.19 Non-Waiver. None of the provisions of this Contract shall be considered waived by either party, unless such waiver is specifically specified in writing.

3.17 .20 Stadium Manager's Right to Employ Other Contractors. Stadium Manager reserves right to employ other contractors in connection with this Project or other projects.
(SIGNATURES ON NEXT PAGE]

Page 19 of 40 ends

Contract Number: 10051-B

SIGNATURE PAGE FOR ON-CALL REPAIR CONTRACT

BETWEEN THE FORTY NINERS STADIUM MANAGEMENT COMPANY LLC AND CUPERTINO ELECTRIC, INC.

IN WITNESS WHEREOF, the Parties have entered into this Contract as of the First day of May, 2021.

FORTY NINERS STADIUM

MANAGEMENT COMPANY LLC
sr k'u~
~Mercurio
Executive Vice President &
General Manager
ATTEST:

CUPERTINO ELECTRIC, INC.

Proiecl Executive
Printed Name: Jim Medefesser

Page 20 of 40 ends

A. SCOPE OF WORK
EXHIBIT"A"

SCOPE OF WORK
Troubleshoot, repair, remove and install electrical equipment and components, typically found in a large sports stadium, rated at less than 60KV. This work will be performed via issuance of a Task Order (defined elsewhere in this solicitation). The work assigned to Contractor will be designated with one of the following "priority levels" which will indicate the urgency of the work and the Contractor's response time:

Priority Level Type Response Time
1 - High Emergency - Hazardous, Respond within 1 hour and property damage, and/or commence work as soon as
event required support possible.
2- Medium Systems Malfunction - Respond within 2 hours and Interruption of daily commence work with 24 hours.
operation
3- Low Minor Repair Respond within 24 hours and
commence work within 72
hours, or as determined
necessary by the Stadium
Manager.

The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required.

The Contractor shall maintain all necessary licenses to perform the work specified herein.

The Contractor will be responsible for supplying all necessary equipment (including aerial lifts), tools, consumables, material, labor, and supplies required to perform the work described herein.

Pursuant to this contract, the Contractor will be tasked, by the Stadium Manager, with performing troubleshooting, repairing, and performing maintenance of various electrical systems at the Stadium, including but not limited to the following:

1. Electrical power work, and communications cabling, including, but not limited, to the following:
a. Power connections for electric-powered equipment;
b. Circuit breaker replacement;
c. Disconnect replacement;
d. Fuse replacement;

Page 21 of 40 ends

e. Conduit repair and installation, including PVC coated rigid conduit and fittings, PVC, flexible conduit, etc.;
f. Wire and electrical cable repair and installation, including copper, aluminum, all insulation and wire types;
g. Transformer removal and replacement;
h. Sub-panel removal and replacement;
i. Electrical devices, including receptacles, switches, etc. Repair, removal or replacement;
j. Motor, starters, controllers, and variable frequency drives. Repair, removal or replacement;
k. Automatic transfer switches;
I. UPS systems and clean power systems, low/medium voltage distribution systems, electrical grounding systems. Trouble shoot and repair; replace batteries as necessary;
m. Troubleshoot and repairs to back-up power systems;
n. Install or repair electric vehicle charging equipment; o. Repairs to computer power floor cables and connections, under carpet raceways, connections to electrified furniture partitions, electrical devices and trim;
p. Work in electric duct banks; and
q. Fiber optic cable repair, replacement, installation.

2. Lighting and physical security work, including, but not limited to, the following:
a. Indoor and outdoor lighting repairs and installations, including exterior pole mounted fixtures, and sports field lighting; b. Lamp removal and replacement, including HID, fluorescent, incandescent, etc.; c. Ballast removal and replacement, including HID, fluorescent, etc.; d. New lighting fixture installation, all types;
e. Lighting control work. Contractors must have experience with a variety of lighting control systems, including Lutron and Crestron control systems;
f. Provision of temporary lighting, as necessary; and
g. Conduit and related work for parking lighting, rolling gates, and other related electrical equipment.

3. Testing & Maintenance:
a. Arc Flash assessment;
b. Infrared inspection;
c. Coordination study;
d. Switch gear testing;
e. Emergency generator testing;
f. Power monitoring;
g. Motor control center cleaning; and
h. Ground fault testing.

B. GENERAL REQUIREMENTS

1. All work performed shall meet the latest revision of all applicable federal, state, and local regulations, laws, and codes.

2. All work schedules must be approved in writing by the Stadium Manager prior to

Page 22 of 40 ends

commencement of work.

3. Unless otherwise specified, Contractor shall guarantee the labor and materials used are within the specified guidelines and recommendations of the manufacturer.

4. Materials furnished shall be new and shall be of commercial quality material. Used, reconditioned, or discontinued models and materials are not acceptable. The warranty period for contractor provided materials shall be for a period of 1 year, or within the manufacture warranty, whichever is longer. Such warranty shall commence upon the date of acceptance of Contractor's work by the Stadium Manager.

5. The Stadium Manager reserves the right to supply all or part of the materials or equipment on any project/repair.

6. Contractor shall be responsible for the replacement of failed/defective equipment, and parts installed by Contractor that are under warranty. Such cost, if any, shall be incurred by Contractor. Contractor shall assume all liability for such defects.

7. Follow up work required to correct recent repair/improper repair, or substandard parts shall be at no charge to the Stadium Manager.

8. Contractor shall coordinate site access and Hot Work with Forty Niners Stadium Management Company Engineering Department prior to commencement of work.

9. Contractor shall complete a service tag/log after completion of work. Such tag or log must contain the following information:
a. Date of Service
b. Name of Technician(s)
c. Description of Service(s)

10. Contractor shall notify Stadium Manager when a recall is issued for any equipment or component serviced, installed, or repaired by Contractor. Notification by Contractor shall include the reasons for the recall, procedures for replacement, and the disposition of the recalled equipment.

11. Contractor is responsible for compliance with all building code requirements.

Independent of, or in addition, to any other legal requirements, the Stadium Manager may inspect and test Contractor's work to determine if it conforms to the California Building Standards Code and local regulations, if applicable. The Stadium Manager will not accept Contractor's work unless it meets all applicable building code requirements.

12. The use of the safety equipment includes but is not limited to hard hats, eye protection, safety vests, hearing protection, fall protection, and safety boots as required by the California Occupational Safety and Health Administration.

13. Contractor is required to provide personal protective equipment (PPE) to perform the work and follow the Public Health Orders issued by the Santa Clara County Health Department related to Novel Coronavirus (COVID-19). The Public Health Order

Page 23 of 40 ends

updates can be accessed online at
I 1tlps://www.sccgov.org/sites/covid 19/Paqes/public-health-orders. aspx

14. Contractor shall maintain all necessary licenses to perform the work specified herein.

15. Contactor shall be in compliance with applicable prevailing wage laws and the California Labor Code.

16. Contractor shall provide protection for all existing building components beneath and around the work. Any damage to existing building components caused by contractor shall be immediately repaired or replaced at contractor's sole expense in a manner acceptable to and approved by Stadium Manager.

17. In all active work areas, contractor shall provide, install and maintain all necessary barricades and warnings to prohibit pedestrian access into any affected work area.

This not only includes areas surrounding the work, but also includes areas below the work. Levi's Stadium is an active building containing employees, guests, and other contractors on a daily basis. Contractor shall be responsible for keeping others out of its active work areas and preventing the exposure of others to grinding, sanding, scraping, paint drips, overspray or any other material generated within the work area, both around and below.

18. Contractor will have a designated representative to oversee Contractor's technicians assigned to perform the work specified herein. Contractor representative shall be responsible for providing all required documents, including, but not limited to, reports, invoices, as-built drawings and all other project contract documents to the Stadium Manager.

19. Contractor shall assign a primary/secondary technician(s) as the main contact for the Stadium Manager during the term of the contract. If different representatives are designated during the term of the Contract, notice of any changes (including, but not limited to, name, address, e-mail, and telephone number) shall be promptly served in writing.

20. Contractor must obtain written authorization prior to commencement of work. The Stadium Manager will provide Contractor written approval by issuing a Notice to Proceed.

21. The Contractor shall perform the following to ensure a clean, safe work site:
a. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from project site. Secure, locate and position all unused materials and equipment, including man lifts, to the satisfaction of Stadium Manager.
b. After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished or unfinished surfaces. Do not allow coatings to drip, spatter onto or otherwise stain adjacent ~urfaces.

Page 24 of 40 ends

c. Protect work of other trades against damage from coating operation. Correct damage by cleaning, repairing, replacing, and recoating, as approved by Stadium Manager, and leave in an undamaged condition.
d. Protect all adjacent surfaces as required by field conditions.

C. REGULATIONS AND STANDARDS
All material and work shall be in accordance with the rules and requirements of the United States Department of Labor Occupational Safety and Health Administration ("OSHA"); National Electrical Code ("NEC"); National Fire Codes published by the National Fire Protection Association ("NFPA"); California Administrative Codes ("CAC"); Uniform Building Code ("UBC"); Uniform Plumbing Code ("UPC"); and other applicable federal, state, and local laws and/or regulations. These specifications shall not be construed to permit work not conforming to these requirements. The regulations shall govern where they require higher standards or conflict with the specifications. Published rulings and interpretations of the enforcing agencies shall be considered a part of these specifications. All regulations and standards shall be the latest publication unless governing authorities require otherwise. In addition, all of Contractor's work shall be in accordance with the best practices available in the industry, and shall present a neat, workmanlike appearance upon completion.

Page 25 of 40 ends

EXHIBIT "B"

PLANS AND SPECIFICATIONS
Plans and Specifications shall be provided and made a part of each individual Task Order.

Page 26 of 40 ends

EXHIBIT "C"

SPECIAL CONDITIONS
ARTICLE 1. BONDS
Within ten (10) calendar days from the date the Contractor is notified of award of the Contract, the Contractor shall deliver to the Stadium Manager four identical counterparts of the Performance Bond and Payment Bond on the forms supplied by the Stadium Manager and included as Exhibit "F" to the Contract. Failure to do so may, in the sole discretion of Stadium Manager, result in the forfeiture of Contractor's bid security. The surety supplying the bond must be an admitted surety insurer, as defined in Code of Civil Procedure Section 995.120, authorized to do business as such in the State of California and satisfactory to the Stadium Manager. The Performance Bond and the Payment Bond shall be for one hundred percent (100%) of the Total Contract Price.

Page 27 of 40 ends

EXHIBIT "D"

CONTRACTOR'S CERTIFICATE REGARDING WORKERS' COMPENSATION LABOR CODE - SECTION 1861
I, the undersigned Contractor, am aware of the provisions of Section 3700, et seq., of the California Labor Code which require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of the Code, and I, the undersigned Contractor, agree to and will comply with such provisions before commencing the performance of the Work on this Contract.

CUPERTINO ELECTRIC, INC.

By:

Project Executive
Title (Print)

Page 28 ends

EXHIBIT "E"

PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
Pursuant to Labor Code Sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.qov/Public­ Works/PublicWorks.html for additional information.

No bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with t11e Department of Industrial Relations to perform public work.

Contractor hereby certifies that it is aware of the registration requirements set forth in Labor Code Sections 1725.5 and 1771.1 and is currently registered as a contractor with the Department of Industrial Relations. 1
Name of Contractor:_--=C-=u=p=ert:..:.i=n=o-=E=le=c=t"'"'ri=c,....,l.:..:n-=-c·'------ DIR Registration Number: _ _,_1 O.;;..0aa..;0a..a0'""0""'3-'-69=--2=-------- DIR Registration Expiration:_6~/~30_/_2_2 ______ _
Small Project Exemption: __ Yes or -'X~_ No
Unless Contractor is exempt pursuant to the small project exemption, Contractor further acknowledges:
• Contractor shall maintain a current DIR registration for the duration of the project. • Contractor shall include the requirements of Labor Code Sections 1725.5 and 1771.1 in its contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project. • Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name a , Project Executive
Dated __ SJ'-4--f_,__,1/ ,~/£,'-L-/i ______ _
1 If the Project is exempt from the contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark "Yes" in response to "Small Project Exemption."

Page 29 of 40 ends

PERFORMANCE BOND
KNOW ALL PERSONS BY THESE PRESENTS:

Bond No. 023210162
THAT WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter referred to as "Stadium Manager") has awarded to Cupertino Electric, Inc. , (hereinafter referred to as the "Contractor") a Delaware Corporation an agreement for Levi's Sta:fit.m Oi-Cal Bectrica l'v'antenare am Repair (hereinafter referred to as the "P reject").

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated May 1. 2021 , (hereinafter referred to as "Contract Documents"), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, Cupertino Electric, Inc., the undersigned Contractor and Liberty Mutual Insurance Company as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the Stadium Manager in the sum of T\i\O Hundred Rfty Thousand ard N::v100 DOLLARS, ($250,000.00 ), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the Indemnified Parties, as stipulated and defined in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by Stadium Manager, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the Stadium Manager from loss or damage resulting from or caused by defective materials or faulty workmanship, Surety shall undertake and faithfully fulfill all such obligations. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains.

Nothing herein shall limit the Stadium Manager's rights or the Contractor or Surety's obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

Whenever Contractor shall be, and is declared by the Stadium Manager to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the Stadium Manager's option:

Page 30 of 39 ends

( 1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the Stadium Manager, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term "balance of the contract price" as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the ContracJ Documents. ·
(3) Permit the Stadium Manager to complete the Project in any manner consistent with local, California and federal law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term "balance of the contract price" as used in this paragraph shall mean the total amount payable to Contractor by the Stadium Manager under the Contract and any modification thereto, less any amount previously paid by the Stadium Manager to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the Stadium Manager may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the Stadium Manager, when declaring the Contractor in default, notifies Surety of the Stadium Manager's objection to Contractor's further participation in the completion of the Project. ·
The Surety, for value received, hereby stipulates and ag·rees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project, including but not limited to the provisions of Sections 2819 and 2.845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this 4th day of May , 2021).
(Corporate Seal) Cupertino Electric, Inc.

Title Chief Financial Officer

Page 31 of 39 ends

Liberty Mutual Insurance Company
(Corporate Seal) Sure
By ~l~i~
Sa -in-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached.
(Attach Attorney-in-Fact Certificate) Title _A_tt_o_rn_e...,,.y_-l_n_-F_a_c_t _______ _ The rate of premium on this bond is $13.68 per thousand. The total amount of premium charges, $_1_0_,__,2_6_0 __________ _
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) Liberty Mutual Surety Claims PO Box 34526
(Name and Address of Agent or
Representative for service of
process in California, if different
from above)
(Telephone number of Surety and
Agent or Representative for service
of process in California)
Seattle, WA 98124
Liberty Mutual Insurance Company
790 The City Drive South, Suite 200
Orange, CA 92686
··, .
(714) 634-5712
NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

Page 32 of 39 ends

CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189
~~-~~@§:ffilil00ll5@lc~@§~~~~~OO~lffll:~~gg,:~~~~:gs~~~~ A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Santa Clara
on May 5, 2021
Date
}
before me, _____ N_o_re_e_n_,__J_. A_n_a~g~n_o--'s,_N_o_t_ar~y_P_u_b_l_ic _____ ~ Here Insert Name and Title of the Officer
personally appeared _______ W_il_li_am_R_._S_lak_e~y __________________ _ Name(s) of Signer(s)
NIA
who proved to me on the basis of satisfactory evidence to be the person~) whose name~) is~ subscribed to the within instrument and acknowledged to me that he/~ executed the same in his~ authorized capacity(j{/n), and that by his~~ signature~) on the instrument the person{:2i), or the entity upon behalf of which the person~) acted, executed the instrument.

Place Notary Seal and/or Stamp Above
I certify under PENAL TY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.

WITNESS my hand and official seal.

Signature U/l0tm1 q'

OPTIONAL
Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Performance Bond #023210162-Levis Stadium On-Call Emergency Elect. Maintenance & Repair Document Date: __,M==a+-y~4'-'-, =20=2=1~ ______________ Number of Pages: __ 5 __ Signer(s) Other Than Named Above: ______ N.....c/_A ________________ _ Capacity(ies) Claimed by Signer(s)
Signer's Name: William R. Slakey
Kl Corporate Officer - Title(s): _C_F_O _____ _
□ Partner - □ Limited □ General
□ Individual □ Attorney in Fact
□ Trustee □ Guardian or Conservator
D Other:

Signer is Representing: Cupertino Electric, Inc.
©2018 National Notary Association
Signer's Name: ____________ _
D Corporate Officer - Title(s): ______ _
D Partner - D Limited D General
D Individual D Attorney in Fact
□ Trustee □ Guardian or Conservator
D Other:

Signer is Representing: _________ _
State of Oregon
County of Multnomah County
On ~\)\_(,\.___(JI J4,, ~l_Q-~
.J

NOTARY ACKNOWLEDGMENT
before me, Kelly Michelle Niemela (Insert Name)
personally appeared _..cc.S=ar;...ca=h~H~a=r-'--re=n-'--_____ _, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

Notary Signat
Commission Expiration November 24, 2023
Nata ry Sea I:
1 SURETY
This PcMer of Affu:rey lirm.s the acts ci those Mred herein, arxl trey halle no allhoril.y to bind the Corrpi'cy excep: in the manner and to the extm: herein stated Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company

POWER OF ATTORNEY
Certificate Nl: 8204707- 905031
KNOAfJ AU. PERSOOS BY THESE PRESENTS: That The Olio Casually Insurance Corrpany is a oofjX)!ction duly organized urder the la.Ml CT the state of Nsw Harpshire, Iha! Liberty M.rtual lnsurarre Corrpany is a wixx-alion duly organized uoo,r the la<Ml of the state of lvtlssachusetts, ard WlstPlrerican Insurance Corrpany is a caporation duly organized under the IEMG of lhe Sate ct looiana (herein collectively called the "Carpanies'), pursuant to ard by autho!ity herein set forth, does h:,retJy rare, constitute ard ai;p:lint, Allison Thornhill, Bradley Mapes, Darla Naugher, Emily Nagel, Karl L. Choltus, Kelly M. Niemela, Sarah Harren, Shawn Carlisi all of lhe city of Portland state of OR each irdividually if there oo rrore than one nara:l, its true ard lav.i\.d attorrey-in-fad: to rreke, exea.rte, seal, aclmJ.Mec%;Je ard oo!Ml!", for ard on its behalf as surety and as its oo: ard d€€d, any ard all undertaklrgs, bones, rea:gnizances and cther surely ooligations, in pursuance of lhese presents ard shall be as birdi~ 1.p:x1 the Carpanies as if trey have ooen duly signed by the presim ard attested by lhe secretary of lhe Qxrpanies in their OM1 proper i:;ersons.

IN WTNESS w-EREOF, this R:Mer of Morrey ha5 ooen subsaire::I by an authorized officer or official CT the Cooµmies ard the O'.Jlj:Orale seals of the Cooµmies have ooen affixed theralothis 8th dayol January .~.

Literty M.rtual Insurance Cooµmy
The Olio Casualty Insurance Corrpany
Wist M'Blican Insurance Corrpany
j .,, d:d;z (~
~ .___ ~~ D,vid M Carey, Assistant &:aetary o- g:J
:!:! ro state of FB'NSYLVANIA .£ :5
@ 6J Coonty of rvrNTGOllffiY ss .§ [
.2 §5 Qi this 8th dey of January , 2021 t.efci-e rre personally ai:peared Dsvid M Garey, v.ho a0010i\ledged hirrse!f to be the Assistant &:aetary of l.Jrerty M.rtual Insurance ~ a5 ~ ro Corrpany, The Olio Casualty Carpany, ard VI.est /lrrerican Insurance Coopany, ard that he, as such, bei~ authorized so to cb, exea.Jte the ~ng instn.rrent for the purpooes !§@ :fil .:'. therein contained by signing oo behalf of the o:irporalioos by hirrsetf as a duly authorized officer. ~ ~ a>_~ INWlNESS ~. I have rerainto subsaire::I fl"1/ narre ard affixed fl"1/ notarial seal at King of Prussia, Pennsylvania, on the day ard year first above 'Mitten. ~ c- 00 ro~ ~ _Q '- COMMONWEALTH OF PENNSYLVANIA »=
a>" o Notarial Seal ~ £ <l.) "cii ...., <I) Teresa Pastella, Notary Public ~ J/ -I- ti tf E E 0 ...., Upper Merion Twp., Montgomery County By: ~ 0 <l.) C CU 1,, ~ h _, __________________ ,~ '- (!) ._ ,i,~-.ii,,"'° i:, My Commission Expires Marc 28, 2021 Teresa Pastella, N:Jtary Public <( o 0) U) 0-~ ~V Member, Pennsytvama Association of Notaries Q o ro<I) ~? ~
.g' 2 This R:Mer of M.crrey is mm ard executed pUISuant to ard by authority of the follo-Mng By-lml.5 ard Authorizations CT The Olio Casualty lnsuranoo Cooµmy, Liberty M..Jtual ~ ~ ~ . !::_ I nsurarre Cooµmy, ard \/\est Plrerican lnsurarre Carpany IM'lich resolutions are OON in full force and effect rea:ling as follCMS: a: ~ ._ 2 ARlla..E IV--a:FICER:l: Section 12. R:Mer of .AJ.tcrrey. 0 ~ S2 e?. P-ey officer or cther official of the Corporation authorized for that purpose in 'Miting by the Olairmm or lhe Presim, ard suqed: to such linitation as lhe Olairrran or the ;a T""" -= t,' R"esident rray presaibe, shall ~nt such attorneys-in-fact, as rray be neoossary to ad: in behalf of the Corporation to rmke, execute, seal, acl<ncM!edge ard deliver as surety @ ~ ~ ~ any and all unoortakirgs, oonds, remJnizanres ard cther surely CJ!jigations. &x:h attorneys-in-fact, sltject to the !irritations set forth in their respedive (XMe!S of attcrrey, shall -o ~ ...., t: have full p::Mer to bioo the Corporation by their signature ard execution of any such instrurents and to attoch thereto the seal ct lhe Corporation. ~n so executed, such § <l.) ~ 5 instrurrents shall be as binding as if signed by the President ard attested lo by the &:aetary. /viy pcMer or authority granted to any representative or attorney-in-fact under the ~ ~ prcruisions of this article rray be re.rcwd at any lirre by the B::iard, the Olairrren, the President or by the officer or officers granting such pcMer or authority. t'.c % ARlla..E XIII -Exeruion of Cortracts: Section 5. Surety Bonds ard L\1clerta<irgs. /l-ny officer of the Corrpany authaized for that putpose in 'Mili~ by the chairmm or the presim, and suqect to such linitations as the chairmm or the presioont rray presaioo, shall awoint such attorneys-in-fact, as rray oo neoossary to ad: in behalf of the Carpany to rmke, exerue, seal, adlnoM$ ard oo!Ml!" as surely any ard all unclerta<ings, oonds, rea:gnizarres ard cther surety CJ!jigations. &x:h attorneys-in-fact sltject to the linitations set forth in their resp;,ctive poAerS of attcrrey, shall have full pcw,.er to bird the Corrpany by their signature ard exea.Ition of any such instnrrents ard to attoch thereto the seal of the Corrpany. Wien so exea.ited su::h instnrrents shall be as birding as if signed by Ire president arKl atteste:11:ry Ire secretaiy.

Certificated Desi!:J1alioo-The A"esident of the Q:rrpany, acting pursuant to the Byla<Ml of lhe Q:rrpany, authorizes David M Garey, Assistant Secrela!yto ~nt such attorreys-in­ fad as rray oo neressary to act on behalf CT the Q:rrpany to rr:ake, exea.rte, seal, a00l0i\l$ ard ooliver as surety any ard all urdertaxirgs, cords, rea:gniz.arrel and other surety ooligations.

Authorization - 0:,- unanirmus O'.Jf1S6l1t of the Corrpany's Board of Drectors, the Carpany oonsents that facsinile or rrechanically reprcxluced signature of any assist.ant secretary of the Conpany, w,ere.,er ~ng 1.p:x1 a certified a:fJf of any pcMer of attorney issued by the Q:rrpany in oonned:ion 'Mth &rely oonds, shall be valid and birding ~ the Corrpany wth the sarre force and effect as tl'oo3h mmually affixed.

I, ~ C. Uellellyn, the urrersigned, Assistant &:aetary, The Olio Casualty Insurance Cooµmy, l.Jl:erty MJl:rnl lnsuranoe Carpany, ard VI.est Prreiican lnsuranoo Coo1)any do hereby certify that the cxiginal pcMer of attorrey of v.hich the foregoirg is a full, tn.e ard axred: CJYiJ/ of the PcMer of .AJ.torr-ey exea.Jted by said Coopanies, is in full force ard effect ard I'm nct teen fe',/cwci.

IN TESTIM:NVIM-ER!:D=, I have hereunto set IT1/ haI):l ard affixed the seals of said Corrpanies this~ day of May , ~.

By:~~
Renee C. Uellellyn, Assistant Secretay
LMS-12873 LMIC OCIC WAIC Multi Co_B/20
Bond No. 023210162

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS That
WHEREAS, the Forty Niners Stadium Management Company LLC (hereinafter designated as the "Stadium Manager"), by action taken or a resolution passed May 1 , 2021._has awarded to Cupertino Boctric, Inc. hereinafter designated as the "Principal," a contract for the work described as follows:
_L_e_v_i'_s _S_ta_d_iu_m_O_n_-_C_a_ll _E_le_c_tr_ic_a_l _M_a_in_te_n_a_n_c_e_a_nd___,R_e__._p_a_ir ___ (the "Project"); and WHEREAS, the work to be performed by the Principal is more particularly set forth in the Contract Documents for the Project dated May 1, 2021 ("Contract Documents"), the terms and conditions of which are expressly incorporated by reference; and WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages bf employees of said Principal and its Subcontractors with respect to such wprk or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and Libertyfv'Uual lnsuranceCorrpany as Surety, are held and firmly bound unto the Stadium Manager in the penal sum of _______ _ Two Hundred Fifty Thousand and No/100 Dollars ($250,000.00 ) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 9100 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified.

This bond shall inure to the benefit of any of the persons named in Section 9100 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or

Page 34 of 39 ends

attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or Stadium Manager and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 9100 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned and the provisions of Sections 2819 and 2845 of the California Civil Code.

IN WITNESS WHEREOF, we have hereunto set our hands and seals this 4th day of May , 201j_.
(Corporate Seal)
(Corporate Seal}
Title
Cupertino Electric. Inc.

Contractor/ Principal
8~!....ill=ia·:,,,,m..JR1=_==s~=ey;::;;;~'.:::::::===~Z--4 -- Liberty Mutual Insurance Company
Surety
\.,¾.)w.__.,,; By_,,.,,._,__ __ -"-,,,,_ ______ _
s y-in-Fact
Attorney-In-Fact
Signatures of those signing for the Contractor and Surety must be notarized and evidence of corporate authority attached. A Power-of-Attorney authorizing the person signing on behalf of the Surety to do so much be attached hereto.

NOTE: A copy of the Power-of-Attorney authorizing the person signing on behalf of the Surety to do so must be attached hereto.

Page 35 of 39 ends

CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Santa Clara
On May 5, 2021
Date
}
before me, __ N_o_1_·e_e1_1.,_J._An_a_._g'--n_o-'-s,_N_o_t_ai__,_·y_P_u_b_h_' c ________ ~ Here Insert Name and Title of the Officer
personally appeared _______ W_ill_ia_m_R_. S_l_al_ce---'-y-------------------~ Name(s) of Signer(s)
NIA
who proved to me on the basis of satisfactory evidence to be the person(~) whose name~) is/a.!'Ji! subscribed to the within instrument and acknowledged to me that he/~ executed the same in his~ authorized capacity(~. and that by his/~ signature~) on the instrument the person(i), or the entity upon behalf of which the person~) acted, executed the instrument.

Place Notary Seal and/or Stamp Above
I certify under PENAL TY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.

WITNESS my hand and official seal.
,j/\,nruw "-,r/J W1 ~,,
Signature f I
Signatu

OPTIONAL
Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Payment llond #023210162-Levis Stadium On-Call Emergency Elect Maintenance & Repair Document Date: _=M=a""'yf--"'4~, =2~02=1 ______________ Number of Pages: __ 4~-- Signer(s) Other Than Named Above: ____ N_/_A __________________ _ Capacity(ies) Claimed by Signer(s)
Signer's Name: William R. Slakey Signer's Name: ___________ _ ID Corporate Officer - Title(s): CFO □ Corporate Officer - Title(s): ______ _ □ Partner - □ Limited D General □ Partner - □ Limited □ General □ Individual □ Attorney in Fact □ Individual □ Attorney in Fact □ Trustee □ Guardian or Conservator □ Trustee □ Guardian or Conservator □ Other: -------,.-,------,,--.------,..,,--,--~~- □ Other:

Signer is Representing: Cupertino Electric, Inc. Signer is Representing: _________ _ ©2018 National Notary Association

NOTARY ACKNOWLEDGMENT
State of Oregon
County of Multnomah County
On \\}\ ~\t,\ J+l ~''\ \. f I ( ) __ '_ \:..,.\-.. 1----'----c,I___\---- be ore me, _K~e=ll~Y~M~i~ch~e~ll~e~N~ie_m~e~a_ Insert Name personally appeared -=Sa=r-=a-'-'h~H=aco...rr'-"e'""n'--_____ _, who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

Notary Signat
Notary Seal:

November 24, 2023

OFFICIAL STAMP

KELLY MICHELLE NIEMELA

NOTARY PUBLIC - OREGON
COMMISSION NO. 994145
MY COMMISSION EXPIR:~~~Jj
1 ~Libert):
~ MutuaL
SURETY
Tiis Pc,,-,er of~ limits the acts ci those narred remn, aoo they have oo auhority to tio:I the~ exce,t in the rranmr and to theextert herein stated Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company

POWER OF ATTORNEY
Certificatef\b: 8204707- 905031
KNCMN Al.L PERSallS BY Tl-ESE PRESENTS: That Toa Oiio Casualty Insurance Corrpccy is a OO!pOralion duly aganizffl under the !WIS cf the State of N:1.v HaTpshire, that Lil:aty MJtuaJ lnsurarx;e Corrpany is a oorporalion duly organized under the I= of the Stale of Mlssacluletts, and VI.est Arrerican lnsurarre Qxrpany is a o:xpcration duly organized under the lcMS of the Stale of lmiana (herein roledively called the "Carpanies'), pursuant to and by authority herein set forth, doos hereby rare, oonstitute and appoint, Allison Thornhill, Bradley Mapes, Darla Naugher, Emily Nagel, Karl L. Choltus, Kelly M. Niemela, Sarah Harren, Shawn Carlisi all of !ha city of Portland state of OR each irdMdually if there be rrore than one nared, its true and 18'MUI attorney-in-fact to mike, execute, seal, ackrx:M!ecge and ooli\er, fur and on its t:ehalf as surety and as its act and deed, any and all undertakings, boo:ls, ~nizanres and cther surely obligations, in p.irsuarre of these presents and shall be as bindirg l4)0l1 the Carpanies as if they have ooen duly signed by the president and attested by the secretary of the Corrpanies in their OM1 prope< persons,
IN WTNESS WERBJF, this R:Mer of Marney has ooen subscriood by an authorized officer or official of the Carpanies and the corporate seals of the Carpanies have ooen affixed theretothis~dayol January .~.

Lioorty M.ltual lnsurarre Qxrpany
Toa Oiio Casualty Insurance Qxrpany
VI.est Arrerican Insurance Qxrpany
~ .,, 1/VY:;; u
• ~ Divid M Carey, Assistant Secretary g-_a '6 ~ Stateof PEI\NSYLVANIA ss ·c :::iE ~ Ol CoontyoflVCNTOOv'ERY . .Q €'
.;:'. ~ 01 IHs 8th day of January , 2021 befcre rre personally~ Divid M Carey, 'MIO admoMedged hirrse!f to be the Assistant 8ecrEtary of Liberty M1ual lnsuranre ~ <ll ~ ai Oxrpany, Toa Oiio C.asualty Corrpany, and VI.est Plrerican Insurance Carpany, and that he, as such, beirg authorized so to do, execute the fi:re(;pirg instrurent for the purposes !§ @ ~ i therein cootained by signirg oo t:ehalf of the corporations by hirrself as a duly authorized officer. ~ ' ~-.g IN \I\ITNESS WERECF, I have hereunto subscriood IT!/ narre and affixed IT!/ notarial seal at Kirg cf Prussia, Pemsylvania, on the day and ~ first aoove witten. ~Cl) c·- 0 row ~o
.Q !!'. COMMONWEALTH OF PENNSYLVANIA ';:2:
(I) 0 Notarial Seal 6' i ~ ·ro
+-' Q.) · Teresa Paslella, Notary Public {lj 11 ~ • • . , I) -f- ,1 J "-- E 0 ...., Upper Merion Twp., Montgomery County By: ~ ~ .8 ID ~ ~ 1;1,),.-YSy1,.\J;-~"' c., My Commission Expires March 28,2021 Teresa Pastella, l\btaiyR.!biic ~ a ~ 1n O,:.q ,svV Member, Pennsylvania Assaciatfon of Notaries t) o ro~ FiYP . • ,._"St
.gi 2 This R:Mer of Mcmey is rrade and exea.rted purnuant to and by authority of the follo.'>irg By-law, and Jl.ulhorizations of Toa Qiio Casualty Insurance Corrpany, Liberty M.Jtual ~ ~ ~ .~ lnsuranceCarpany, ard WlstArrerican lnsuranoaCarpanyW'\ich resolutions are rx:min full force and effect readirg as folloos: & ~ c.. 2 ARTia.E IV-o=FICERS: Section 12. Pw.er of Pltcmey. 0 ~ '. 0 ~ f.lr.J officer or cther official of the OxpJralion authcxized for that puq:iose in IMitirg by the Oiairrran or the President, and suqect to such !irritation as the Oiairmm or the ::a..- :g G President may presaire, shall ~nt such attorneys-in-fact, as may be neressary to act in behalf of the Corporation to n-a<e, execute, seal, acMc:1Mecge and deliver as surety @ ~ ro c any and all undertakings, bonds, reo:ignizanres and cther surety obligatkrn. Such attorneys-in-fact, si.qect to the !irritations set forth in their respective poAerS of attcmey, shall -::, !'.J ~ ~ have full JXMe!' to bind the Corporation by their signature and execution of any such inslrurrerrts and to attach thereto the seal of the Corporation. Wien so executed, such.§ <ll z [l instrurrerts shall be as bimirg as if signed by the Resident and attested to by the Secretary. My poAer or authority grarted to any rer.resentalive or attooiey-in-fad. under the ~ ~ pravisions of this artide may be revd<ed at any tirre by the Board, the Qiairrmn, the President or by the offirer or offirers grantirg such JXMe!' or authority. ~ t ARTia.E XIII - Exectiion d Ccrtracts: Section 5. Surety Bards and l.h:E!ta<irgs. f.lr.; officer of the Corrpany authorized for that pufJX)Se in 'Mit:irg by the chairrmn or the r:rasioont, and suqect lo such !irritations as the chairrmn or the presioont may prescribe, shall a,::r.oint such attorneys-in-fact, as may be neressary to act in t:ehalf of the Qxrpany to rrake, exea.rte, seal, a~ecge ard ooli\er as surety any and all undertakings, bonds, reo:ignizanres and cther surety obligations. Such attorney&in-fad. st.tject to the linitations set forth in their respective poM:1fS or attorney, shall have full pcMer to bird the Corrpany by their signature and execution of any such instrurrents and to attach tl'aeto the seal of the Corrpany. Wien so executa:I such instrurents shall be as bindirg as if signed by the president and attested by the secretary.

Certificate ci Desigialion- The Resident of the Qxrpany, adirg pursuant to the By!cMS of the Qxrpany, authorizes Divid M Carey, Assistant Secretruy to ~nt such att01rey..rin­ fact as rray be neressary to a::t on behalf or the Corrpany to~. execute, seal, ackn<Mi!ecge and ooli\€r as surety any and all urrlertal<lngs, bords, ~nizances and other surety cbligalions.

Authorization - By unanirroos axisent of the Carpany's Board of Cirectorn, the Ccrrpany 001S6!1ls that facsinile or rrechanically reproduoed signature of any assistant secre\81)' of the Corrpany, lAherever apr;Earirg Lpon a certified~ of any poAer of attorney issued by !ha CaTpany in ronnedion wth surety boo:ls, shall be valid and birdirg upon the Corrpany 'hilh the sarre force and effect as t.hoLgh rrenually affixed.

I, Renee C. Llev.ellyn, the undersigned, Assistant SecrEtary, 1he Olio Casualty lnsuranre Carpany, Utaty Mltual lnsuranre Corrpany, and Wlst Plreriam Insurance Corrpany do hereby certify that the aiginal pcMe!' of attorrey of W'\ich the foregoirg is a full, lru3 and correct CXY,JJ of fre R:Mer of Attorney executed by said Ccrrpanies, is in full force and effect and has not been rcVOked.

IN TESTIIVONY w-EREOF, I have hereunto set rT1/ hand and affixed the seals of said Corrpanies this 4th day of __ M_ay~-• ~.

By:u~
Renee C. LJEMe!lyn, Assistant Secretar/
LMS-12873 LMIC OCIC WAIC Mulli Co_B/20
EXHIBIT "G"

RATE SCHEDULE
Billable Labor Rates Straight Daily Saturday Sunday &
Time/Weekday Holiday
A Journey Level:
1 COMM & System Installer $104.71 $139.93 $175.72 $175.72 2 COMM & System Tech $113.82 $152.09 $191.00 $191.00
3 Inside Wireman, Technician $162.76 $217.64 $273.43 $273.43 4 Cable Splicer $211.60 $282.93 $355.48 $355.48
5 Material Handler $98.77 $131.05 $162.81 $162.81
6 Material Handler - Fourth Six Months $80.71 $107.24 $133.21 $133.21 7 Material Handler - Third Six Months $71.82 $95.29 $118.39 $118.39 8 Material Handler- Second Six Months $62.85 $83.40 $103.61 $103.61 9 Material Handler - First Six Months $53.86 $71.46 $88.79 $88.79 8 Apprentice Level:
1 Electrician, Inside Wireman - 5th period $105.79 $141.45 $177.74 $177.74 2 Electrician, Inside Wireman - 6th period $113.93 $152.34 $191.41 $191.41 3 Electrician, Inside Wireman - 7th period $122.08 $163.22 $205.07 $205.07 4 Electrician, Inside Wireman - 8th period $130.22 $174.09 $218.75 $218.75 5 Electrician, Inside Wireman - 9th period $138.34 $184.98 $232.41 $232.41 6 Electrician, Inside Wireman-10 th period $146.49 $195.86 $246.09 $246.09 C Materials & Consumables Mark-Up from Actual Cost to Contractor is 13% D Equipment Rentals Mark-Up from Actual Cost to Contractor is 13%

Page 38 of 40 ends

1. Materials and Consumables
a. Materials (which include replacement parts, new components such as panel boards, transformers, etc., but does NOT include the cost of small tools) and consumables, which are "minor" materials actually "consumed" during the course of work (such as caulking, solder, tape, etc.) shall be provided to the Stadium Manager at the Contractor's "cost" (meaning what the Contractor paid the supplier) plus an agreed upon mark-up percentage, which would include handling, storage, etc. b. When the Contractor is invoicing for specific task orders, and that invoice includes materials costs, Stadium Manager, at its discretion, may require invoices documenting what the Proposer paid for said materials.
c. If Stadium Manager issues an "emergency" task order, then this requirement may be waived if Stadium Manager so authorizes.

2. Equipment Rental
a. If the Contractor must rent equipment in order to accomplish a Task Order, the price of that equipment to Stadium Manager shall be the Contractor's actual invoice cost for that equipment, plus an agreed upon mark-up percentage. b. If the Contractor owns equipment, then reimbursement for use of that equipment is to be covered in the Contractor's overall Overhead and Profit mark-up, which is a component of the Contractor's billable hourly rates described above.

3. Permit Fees
a. All permit fees shall be pass through charges billed to the Stadium Manager for actual documented costs charged without markup.

Page 39 of 40 ends

EXHIBIT "H"

SAMPLE TASK ORDER FORM

FORTY NINERS STADIUM MANAGEMENT COMPANY LLC

TASK ORDER
Task Order No. ---
Contract: Levi's Stadium On-Call Electrical Maintenance and Repair Services (#10051-B) Contractor: CUPERTINO ELECTRIC, INC.

The Contractor is hereby authorized to perform the following work subject to the provisions of the Contract identified above:

List any attachments: [INSERT ATTACHMENTS, IF ANY]
Dollar Amount of Task Order: Not to exceed $ __ , __ .00 Liquidated Damages for this Task Order: $:XXX per day.

Completion Date: _____ ,20_
The undersigned Contractor hereby agrees that it will provide all equipment, furnish all materials, except as may be otherwise noted above, and perfo1m all work specified above in accordance with the Contract identified above and will accept as full payment therefore the amount shown above.

FORTY NINERS STADIUM

MANAGEMENT COMPANY LLC
Dated: _________ _
By:---------
CUPERTINO ELECTRIC, INC.

Dated: _________ _
By: ---------

Page 40 of 40 ends

ATTACHMENT G

LABOR COMPLIANCE ADDENDUM
Contract Title: Levi's Stadium On-Call Electrical Maintenance and Repair Services CUPERTINO ELECTRIC, INC.

CONTRACTOR (Supplier) 1132 N. 7TH STREET
Name and Address SAN JOSE, CA 95112
This Contract is subject to the requirements of California Labor Code section 1720 et seq. requiring the payment of prevailing wages, the training of apprentices, and compliance with other applicable requirements.

A. Prevailing Wage Requirements

1. Contractor shall be obligated to pay not less than the General Prevailing Wage Rate, which can be found at www.dir.ca.gov. Contractor is also required to have a copy of the applicable wage determination posted and/or available at each job site.

2. Specifically, contractors are reminded of the need for compliance with Labor Code Section 1774-1775 (the payment of prevailing wages and documentation of such), Section 1776 (the keeping and submission of accurate certified payrolls) and 1777.5 in the employment of apprentices on public works projects. Further, overtime must be paid for work in excess of 8 hours per day or 40 hours per week pursuant to Labor Code Section 1811-1813.

3. Special prevailing wage rates generally apply to work performed on weekends, holidays and for certain shift work. Depending on the location of the project and the amount of travel incurred by workers on the project, certain travel and subsistence payments may also be required. Contractors and subcontractors are on notice that information about such special rates, holidays, premium pay, shift work and travel and subsistence requirements can be found at www.dir.ca.gov.

4. Only bona fide apprentices actively enrolled in a California Division of Apprenticeship Standards approved program may be employed on the project as an apprentice and receive the applicable apprenticeship prevailing wage rates.

Apprentices who are not properly supervised and employed in the appropriate ratio shall be paid the full journeyman wages for the classification of work performed.

5. As a condition to receiving progress payments, final payment and payment of retention on any and all projects on which the payment of prevailing wages is required, Contractor agrees to present to Stadium Manager, along with its request for payment, all applicable and necessary certified payrolls (for itself and all applicable subcontractors) for the time period covering such payment request.

The term "certified payroll" shall include all required documentation to comply

Page 1 of 4 ends

Attachment G
Labor Compliance Addendum
with the mandates set forth in Labor Code Section 1720 et seq, as well as any additional documentation requested by the Stadium Manager or its designee including, but not limited to: certified payroll, fringe benefit statements and backup documentation such as monthly benefit statements, employee timecards, copies of wage statements and cancelled checks, proof of training contributions (CAC2 if applicable), and apprenticeship forms such as DAS-140 and DAS-142.

6. In addition to submitting the certified payrolls and related documentation to Stadium Manager, Contractor and all subcontractors shall be required to submit certified payroll and related documents electronically to the California Department of Industrial Relations. Failure to submit payrolls to the DIR when mandated by the project parameters shall also result in the withholding of progress, retention and/or final payment.

7. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1 (a)].

8. No contractor or subcontractor may be awarded a contract for public work on a public works project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. Contractors MUST be a registered "public works contractor'' with the DIR AT THE TIME OF BID. Where the prime contract is less than $15,000 for maintenance work or less than $25,000 for construction alternation, demolition or repair work, registration is not required.

9. All contractors/subcontractors and related construction services subject to prevailing wage, including but not limited to: trucking, surveying and inspection work must be registered with the Department of Industrial Relations as a "public works contractor". Those you fail to register and maintain their status as a public works contractor shall not be permitted to perform work on the project.

10. Should any contractor or subcontractors not be a registered public works contractor and perform work on the project, Contractor agrees to fully indemnify the Stadium Manager for any fines assessed by the California Department of Industrial Relations against the Stadium Manager for such violation, including all staff costs and attorney's fee relating to such fine.

11. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

B. Audit Rights
All records or documents required to be kept pursuant to this Contract to verify compliance with this Addendum shall be made available for audit at no cost to Stadium Manager, at any time during regular business hours, upon written request. Copies of such records or documents shall be provided to Stadium Manager for audit at Levi's Stadium when it is practical to do so.

Otherwise, unless an alternative is mutually agreed upon, the records or documents shall be made available at Contractor's address indicated for receipt of notices in this Contract.

Page 2 ends

Attachment G
Labor Compliance Addendum
C. Enforcement

1. Stadium Manager shall withhold any portion of a payment; including the entire payment amount, until certified payroll forms and related documentation are properly submitted, reviewed and found to be in full compliance. In the event that certified payroll forms do not comply with the requirements of Labor Code Section 1720 et seq., Stadium Manager may continue to hold sufficient funds to cover estimated wages and penalties under the Contract.

2. The Stadium Manager is not obligated to make any payment due to Contractor until Contractor has performed all of its obligations under these provisions. This provision means that Stadium Manager can withhold all or part of a payment to Contractor until all required documentation is submitted. Any payment by the Stadium Manager despite Contractor's failure to fully perform its obligations under these provisions shall not be deemed to be a waiver of any other term or condition contained in this Contract or a waiver of the right to withhold payment for any subsequent breach of this Contract.

Stadium Manager, the Santa Clara Stadium Authority, or the California Department of Industrial Relations may impose penalties upon contractors and subcontractors for failure to comply with prevailing wage requirements. These penalties are up to $200 per day per worker for each wage violation identified; $100 per day per worker for failure to provide the required paperwork and documentation requested within a 10-day window; and $25 per day per worker for any overtime violation.

Stadium Manager
Name: Jim Mercurio
Title: EVP, Stadium Operations and General Manager
Email: [email protected]
f
Attachment G
Labor Compliance Addendum
Contractor (Supplier)
Name: Jim Medefesser
Title: Project Executive
Email: [email protected]

Page 3 of 4 ends