Mark Ups ODCs Total
$270.00 $228.00 $190.00 $180.00 $168.00 $150.00 $95.00 $170.00 $228.00 $312.00 LS Fee LS Fee LS Fee 1 .1 Project Management 2 5.0 7.0 1 4 $3,010 $0 $3,010
1.2 A erial Flyover Image of the Fence Line (approx. 60 mi les) 6.0 6 $1,008 $23,000 $2,300 $26,308
1.3 R eview the Fence Line Aerial to Measure damaged fence 2 4.0 1 2.0 40.0 58 $9,468 $0 $9,468
1.4 P repare Construction Cost Estimate to Repair the Fenc e 0.5 2.0 2.0 1 2.0 17 $2,771 $0 $2,771
2.1 Project Management 1.50 3.00 5.0 1 0 $2,039 $0 $2,039
2.2 Site Visit by Fire Damage consultant 0 $0 $ 6,000 $600 $6,600
2.3 Meeting with City PM and Consultant to Review Fire Damage findings 3.00 3.0 6 $1,254 $700 $70 $2,024
2.4 Construction Cost Estimate for Fire Damage Site Remediation/Trees 1.00 1.00 1.0 6 .0 9 $1,588 $700 $70 $2,358
2.5 Construction Cost Estimate for Site Demolition 0.50 2.00 1.0 8 .0 12 $1,981 $0 $1,981
2.6 Allowance for services to be determined by City 4.00 8 .0 8.0 20 $3,456 $0 $3,456
3.1 Revisions to 1.4, 2.4 and 2.5 per City comments 1.0 2.0 2 6 6 17 $3,014 $0 $3,014 9 26 21 0 32 80 0 0 0 168 $29,589 $23,000 $7,400 $0 $3,040 $0 $63,029 OS
1 Bid Plans, Tech Specifications & Estimate for Fenc e 2 4 18 12 82 124 2 42 $39,408 $5,000 $500 $44,908.0 OS2 Bid Plans, Tech Specifications & Estimate for Site Demo & Cleanup 1 2 6 6 50 70 1 35 $21,846 $3,500 $350 $25,696.0 OS3 Budget for services as requested by the City 8 16 16 40 50 70 2 00 $34,948 $0 $5,000 $39,948.0 Total Basic Services + Optional Services 11 22 40 58 182 264 0 0 0 577 $125,791 0 3,500 5,000 $850 5,000 $173,581 Notes:
1 D
istribution of Hours may vary during the performance of the services 2 Tasks
OS1 and OS2 is an estimate for budgeting. Actual fee proposal based on findings from the site evaluations Subtotal
Subtotal
Optional Services
Task
# Task Description
Proposal for: Engineering Services to Perform Site Review and Prepare Construction Cost Estimate Basic Service Subtotal
Design
E
ng
Eng
Intern
Land
Surv
Assist
Eng
Survey
Tech
TASK 1 - PERIMETER FENCE AERIAL IMAGES, INVESTIGATION AND CONSTRUCTION COST ESTIMATE Aerial
Survey
Environmental
Co
nsultant
TASK 2 - FIRE DAMAGE SITE REVIEW FOR REMEDIATION AND DEMOLITION - CONSTRUCTION COST ESTIMATE Union
Survey
Crew
Prin Structural
Engineer
City of Santa Clara - Silicon Valley Power
$41,557
TASK 3 - ALLOWANCE FOR REVISIONS TO TASK 1 & 2 $18,458
Sen
Proj
Mngr
Prof.
Eng I
Proj.
Eng
(DE III) Total Fee10% Sub Mark
Up
Other
Direct
Costs
Total
Hours
Total Labor
Costs
06/15/2022 - v2
ATTACHMENT 1: QUOTE FOR AMENDMENT NO. 3