RESOLUTION NO. 22-9133

A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA,

ADOPTING THE SANITARY SEWER OUTLET CHARGE

CONVEYANCE FEE UPDATED REPORT AND LIST OF

IMPROVEMENTS
BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

WHEREAS, pursuant to Santa Clara City Code section 17.15.220, subdivision (c) and Resolution Number 07-7 415, the City is authorized to collect charges for persons who desire to connect to the sanitary sewer system;
WHEREAS, the Sanitary Sewer Outlet Charge - Conveyance Fee established by Resolution 07- 7 415 may be modified and updated periodically by resolution of the City Council pursuant to any applicable law, rule, regulation and conformance with any subsequent fee study prepared by or on behalf of the City of Santa Clara; WHEREAS, the Sanitary Sewer Outlet Charge - Conveyance Fee was last modified and updated by Resolution 10-77 41 pursuant to all applicable law, rule, regulation and conformance with subsequent fee study prepared by the City of Santa Clara; WHEREAS, the City Engineer has created an updated Sanitary Sewer Outlet Charge - Conveyance Fee Report (hereinafter "Report") which is attached and includes costs associated with the sewer infrastructure improvements including acquisition, administration, plan, design, construction, and reconstruction of public sanitary sewer facilities; and, WHEREAS, the Report has identified the need to update the list of improvements;

NOW THEREFORE, BE IT FURTHER RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. That said Report, as duly revised and corrected if necessary, is hereby approved, confirmed and adopted.

Resolution/Conveyance Fee Updated Report
Rev: 11 /22/17

Page 1 of 2 ends

3. That the list of improvements contained in the Report, as duly revised and corrected if necessary, is hereby approved, confirmed and adopted.

4. That the Sanitary Sewer Outlet Charge - Conveyance Fee collected pursuant to Santa Clara City Code section 17.15.220, subdivision (c) shall be used to finance the public facilities described or identified in the Report.

5. That the amount of the Sanitary Sewer Outlet Charge - Conveyance Fee may be modified and updated periodically by resolution of the City Council pursuant to any applicable law, rule, regulation and conformance with any subsequent fee study prepared by or on behalf of the City of Santa Clara .

6. Effective date. This resolution shall become effective immediately .

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 16TH DAY OF AUGUST 2022, BY THE FOLLOWING VOTE:

AYES : COUNCILORS :

NOES: COUNCILORS :

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

Attachments incorporated by reference:

Becker, Chahal, Hardy, Jain, Watanabe ,
and Mayor Gillmor
None
Park
None
ATTEST : (j;);;;gJJ

NORA PIMENTEL, MMC

ASSISTANT CITY CLERK

CITY OF SANTA CLARA

1. Sanitary Sewer Outlet Charge - Conveyance Fee Report Resolution/Conveyance Fee Updated Report
Rev: 11 /22/17

Page 2 of 2 ends

City of Santa Clara
Sanitary Sewer Outlet Charge
Conveyance Fee
Report
June 2022
Background
In 2007, a Conveyance Fee component of the Sanitary Sewer Outlet Charge was approved by City Council (Resolution 07-7 415). The Conveyance Fee funds capacity improvements to the sanitary sewer system required as a result of intensification and densification of land uses permitted by the General Plan and associated development land use amendments. The fee was subsequently updated in 2009 and 2010 with the following actions:
• Resolution 09-7643 approved on June 16, 2009 to update the fee to include costs of bond issuance to fund and implement projects
• Resolution 10-77 41 approved on June 8, 2010 to update the fee with consideration of the following: a) resolution of other funding opportunities (i.e. redevelopment and stimulus funds); b) incorporation of latest land use information from the General Plan update finalized in 201 O; and c) adjustments to the capacity project improvements listing resulting from a) and b).

Technical Basis for Projects and Fee
The initial establishment of the fee in 2007 was based upon projects identified in the 2007 Sanitary Sewer Capacity Assessment conducted by the City consultant RMC Water and Environment. This assessment accomplished the following objectives: a) develop wastewater flow projections for the City's collection area using up-to-date water use and land use information; b) develop a hydraulic model of the trunk sewer system; c) use the model to identify existing capacity deficiencies and future capacity requirements; and d) develop phased capital projects, including budget cost estimates, for implementing the required capacity improvements to the wastewater collection system. It is also important to note that the assessment fulfilled the requirement for a capacity evaluation and capacity assurance plan as required for all sewer system agencies by the Regional Water Quality Control Board.

Another sewer capacity assessment was conducted in 2009 by RMC Water and Environment.

This assessment (an update to the 2007 assessment) accounted for land use changes resulting from the in-progress General Plan Update which was finalized in 2010. Recommended changes to the capacity project improvement listing and project budget cost estimates were approved with City Council Resolution 10-7741 in June of 2010.

Sanitary Sewer System Capacity Improvements
After approval of the initial project improvement listing in 2007 (Resolution 07-7415), two projects were initiated and completed as listed below. The specific projects are listed below with their completion dates and the specific deficiency project numbers from the project list. • Calabazas Creek Sewer Improvement (El Camino Real Diversion) - 2008 (Project ID/No. 'ECR Diverson')
• El Camino Real Sanitary Sewer Improvement (Flora Vista to Calabazas Creek) - 2009 (Project No. 8)
After approval of the project improvement listing in June of 2010 (Resolution 10-7741), four projects were initiated and completed. The specific projects are listed below with their Sanitary Sewer Conveyance Fee Report
June 2022

Page 2 ends

completion dates and the specific deficiency project numbers from the project list. Two of the projects addressed multiple deficiencies.
• Walsh Avenue Sewer Improvement Project - 2011 (Project ID/No. 'West to East Alternative')
• Sanitary Sewer Improvements Phase II - 2015 (Project Nos. 4A, 4B, 5 and 6) • Scott Boulevard and Park Avenue Sanitary Sewer Improvements - 2016 (Project Nos. 9 and 10)
• Calabazas Creek Sewer Improvement - 2020 (Project No. 11) 2016 Sanitary Sewer Master Plan Update
In 2015, the City initiated work on a comprehensive update to the prior capacity assessment work completed in 2007 and 2009. The analysis considered the latest information on water use and land use changes since 2009. The final report was completed by the City's consultant RMC Water and Environment and issued April 2016 (Sanitary Sewer Master Plan Update Final Report dated April 2016). As with prior reports, the assessment resulted in a recommended phased capital project improvement listing including budget cost estimates. Also, the hydraulic model update served as an important tool in the continuous evaluation of individual development proposals with respect to sanitary sewer capacity impacts and resulting development conditions of approval.
2022 Addendum to 2016 Sanitary Sewer Master Plan Update In 2021, the City initiated work on an addendum to the 2016 Sanitary Sewer Master Plan (SSMP) Update to accomplish the following objectives: 1) analyze a Calabazas Creek trunk line capacity issue; 2) update the Tracy Drive Sewer Improvement project identified in the 2016 SSMP Update; and 3) identify a solution to a deficiency on the Great America Parkway West trunk line. The Calabazas Creek trunk analysis was needed due to the discovery in 2021 of existing sewer network conditions that were different than the hydraulic model. The most notable difference was the discovery of a 19-inch diameter pipe segment that was assumed to be 24-inch diameter (the same as the immediate upstream and downstream segments and consistent with the original as-built drawings). This smaller diameter pipe size results in reduced sewer capacity at this location. The Tracy Drive sewer project was being revised to better balance downstream flow between the Homestead Road and Pomeroy Avenue intermediate trunk lines. The Great America Parkway West trunk deficiency was identified for analysis due to new development plans in the tributary sewer basins.

The extent of the Calabazas Creek trunk line deficiency was evaluated, and four alternatives were studied resulting in three recommended alternatives carried forward to the deficiency project listing. Also, a solution was identified for the Great America Parkway West trunk line resulting in a recommended project to address the deficiency.

The 2022 Addendum provides an update to the 2016 project improvement listing resulting in a combined listing of the 2106 deficiency projects with the additional projects identified in the 2022 analysis. The project improvement listing is included here as Table 1.

Sanitary Sewer Conveyance Fee Report
June 2022

Page 3 of 6 ends

TABLE 1

SANITARY SEWER SYSTEM

CAPACITY IMPROVEMENT PROJECT LISTING
p · t Estimated Capital
r~~ec Project Name Description Improvement
P1
P2
Westside Lift Station
Adjustment
Tasman Lift Station
Adjustment
Adjust the set points for the pumps to a lower
elevation to eliminate unnecessary backups in
the influent line. - -
Adjust the set points for the pumps to a lower
elevation to eliminate unnecessary backups in
the influent line.
-1- - - ----- -----
Upsize 1,600 feet of 8-inch line in Cabrillo Ave.

Cost1
Project
Complete
Project
Complete
P3 Cabrillo Avenue
Sewer Improvement between Lawrence Expressway and Nobili Ave. $2,390 ,000 P4
P5
P6
P6-Alt.

P7
P7-Alt 1
Tasman Drive Sewer
Improvement
Sewer Diversion at
Los Padres
Boulevard and
Saratoga Avenue
Sewer Diversion at
Calabazas Boulevard
and Machado
Avenue
Calabazas Creek
Sewer Improvement
Calabazas Creek
Trunk Upsize and
Installation of Parallel
18-lnch Sewer Under
the Existing 27-lnch
Storm Drain
Calabazas Creek
Trunk Diversion to
Machado Avenue
and Chromite Drive
to a 12-inch line.

Upsize 600 feet of 12-inch line in Tasman Dr.
between Old Ironsides Dr. and Great America
£'kwy. to a 15-inch line: ___ _
Install a weir in manhole S25-85 located in the
intersection of Padres Blvd. and Saratoga Ave.
to divert flow northwest to the existing 12-in line
in Los Padres Blvd.

Install a new manhole upstream of S52-93 in
the intersection of Calabazas Blvd. and
Machado Ave., and install a new 15-inch high­
level diversion line (approximately 200 feet) to
divert excess flow from the existing 24-inch line
in Calabazas Blvd. to the 21-inch line in
Machado Ave. The diversion line should be
about 6 inches higher than the invert of the 24-
inch line. ---
Upsize 1,800 feet of 24-inch line next to
Calabazas Creek between Kifer Rd. and Scott
Blvd. to a 27-inch line. -- -- ----
Upsize 2,400 feet of GIPP lined 22.8-inch
sewer, 24, 27, and 30-inch sewer next to
Calabazas Creek between Kifer Road and
downstream of Scott Boulevard to a 27, and 36-
inch sewer. Install approximately 20 feet of 18-
inch sewer between existing manholes S62-37
and S62-38 under the existing 27-inch storm
drain line.

Install a new manhole upstream of existing
manhole S52-93 at the intersection of
Calabazas Boulevard and Machado Avenue .

Install a weir or high-level diversion sewer
(approximately 120 feet) to divert excess flow
from the existing 24-inch Calabazas Creek trunk
to the 21-inch Machado Avenue trunk. The
diversion line should be approximately 9 inches
higher than the invert of the 24-inch trunk.

Sanitary Sewer Conveyance Fee Report
June 2022
$832,000
$94,000
Project
Replaced by
P7-Alt 1
Project
Complete
$4,170,000
$315,000

Page 4 of 6 ends

P · t Estimated Capital roJec p . t N D . . I
10 roiec ame escnpt1on mprovement
P7-Alt 2
p32
E1 3
Diversion to El
Camino Real (ECR)
and Bowers Avenue
Great America
Parkway West Trunk
Improvements
Upsize 1,800 feet of 10-inch line along ECR
between Calabazas Boulevard and Bowers
Avenue to a 15-inch .

Upsize 2,600 feet of 27-inch along Bowers
Avenue between Chrom ite Drive and Kifer Road
to a 30-inch .

Install approximately 20 feet of 18-inch sewer
on the Calabazas Creek Trunk between existing
manholes S62-37 and S62-38 under the
existing 27-in£h sto~m drain _!!_ne. _
Upsize 5,700 feet of 30-inch line along Great
America Parkway between Old Glory Lane and
Lafayette Street to a 39-inch. Improvements
. excluc!_e the ~isting siphons.

Estimated Total Cost for Projects P3, P4, P5, P7 and P8:

Estimated Total Cost for Projects P3, P4, P5, P7-Alt 1 and P8:

Estimated Total Cost for Projects P3, P4, P5, P7-Alt 2 and P8:

Tracy Drive Sewer
Improvement
Upsize approximately 6,600 feet of 10- to 12-
inch line in Tracy Dr. and Pomeroy Ave . to a 15-
inch line; install a new 15-inch line between
manholes S22-55 and S22-46 in Pomeroy Ave .
and Homestead Rd. (approximately 50 feet) to
divert flow into Homestead Rd. and upsize
approximately 1,400 feet of 18-inch line
downstream to a 21-inch.

Estimated Total Cost for All Projects (assuming P7):

Estimated Total Cost for All Projects (assuming P7-Alt 1):

Estimated Total Cost for All Projects (assuming P7-Alt 2):

Cost1
$7,008,000
$12,993,000
$20,479,000
$16,624,000
$23,317,000
$10,693,000
$31,172,000
$27,317,000
$34,010,000

1. All costs are presented in 2022 dollars and include 30 percent allowance for contingencies for unknown conditions and 25 percent for engineering, administration, and legal costs.

2. Project P8 costs do not include improvements associated with the PHD Alternative 3/Gravity Scenario E project.

3. Project E1 addresses the potential capacity deficiency when parcel APN 316-17-018 begins to discharge its entitled flow of 0.95 mgd into the City's system.

Sanitary Sewer Conveyance Fee Report
June 2022

Page 5 ends

Upcoming Work
The SSMP should be updated every five years to reflect any significant updates or program changes. Work will commence in 2022 on a Request for Proposals to select a consultant to perform a SSMP Update. Staff estimates returning to Council in late 2022 with a recommendation for approval of an agreement. Work would commence shortly thereafter with the planned final report be early 2024. Like prior SSMPs, this work will update the hydraulic model with the latest water use and land use changes. Analysis work will result in identification of any existing deficiencies and future anticipated deficiencies with a resulting project improvement listing with budget cost estimates. After identification of the total project costs, a rate analysis will be performed to determine if the existing conveyance fee rate is appropriate to the needed improvements.

Recommended Actions
It is recommended that this report and the updated capacity project improvement listing be approved. This will allow for continued capacity improvement projects to move forward in parallel with the planned Master Plan Update work. Because the comprehensive update to the SSMP will be initiated in 2022, and the update will include a conveyance fee rate analysis, it is recommended that the current conveyance fee rate be held constant pending completion of the future rate analysis.

Sanitary Sewer Conveyance Fee Report
June 2022

Page 6 of 6 ends