Cities Index.
August 10, 2022 revised demolition and fence estimates provided by Mr. Jared Peters

City Council and Authorities Concurrent
August 30, 2022

Document
August 10, 2022 revised demolition and fence estimates provided by Mr. Jared Peters
Meeting
August 30, 2022
Body
City Council and Authorities Concurrent
Original file
1.6 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

1 SV GROUP INC
CSLB #970115 A, B, C-21, C-22, HAZ
DOSH Registration #1181

(408) 218-0993
155 East Main Ave, Suite 110, Morgan Hill, CA 95037
svgroup.com

Proposal #4884.2
Date: August 10, 2022
Total Pages: 2 Bill To: Jared Peters
2647 Gamblin Dr, Santa Clara
[email protected]
408-205-4007

Project: Sound Wall Demolition

COURSE & SCOPE

DEMOLITION:

SVG proposes to furnish labor and material to complete the following:

1. Remove and dispose of 52 sound wall panels, including columns. Footing removal is not included in this price.

EXCLUSIONS:

1. City or County permit fees and/ or submittals. Relocation and or new Construction of any utility services.

2. Removal and or disposal of any hazardous materials.

3. Assumed ACM materials; chiller systems; Hazmat Decon; cutting and capping of utilities; hidden / inaccessible / mis-identified &/or quantified hazardous materials; Disposal costs for any PCB caulking/contaminated concrete &/or PCB paint; PCB transformers; any items scheduled to be saved and/or salvaged; site fencing; temp. facilities/restrooms; hazardous soils remediation; water & power accessibility at site (to be provided by owner or GC); LBP/LCP abatement; Final air clearances by a 3rd party IH.

4. Any decontamination of any equipment and or building components; removal or disposal of any chemicals to be done by others.

5. Disposal of any concrete containing welded wire.

6. Mass Excavation; Shoring; Drilling; Grading; Backfill and Compaction.

7. Multiple phases or mobilizations; Weekend work; Night work; Payment and performance bond costs.

TOTAL PROPOSAL AMOUNT: $41,518.00

Jared,

Thank you for providing us with an opportunity to bid on your upcoming project. SVG is pleased to submit our Lump Sum Proposal based on the following scope of work. We look forward to making this a safe and successful project for both parties.

This Proposal is deemed withdrawn if not accepted in writing within (30) thirty days. Please contact us with any questions.

ENGINEER/NC

ENVIRONMENTAL

SPECIALTY CONTRACT/NC

2 SV GROUP INC
CSLB #970115 A, B, C-21, C-22, HAZ
DOSH Registration #1181

(408) 218-0993
155 East Main Ave, Suite 110, Morgan Hill, CA 95037
svgroup.com

NOTES:

1. Stated price contingent on above quantity and scope with no obstructions or delays.

2. Stated price includes documented disposal of all debris associated with demolition.

3. Stated price assumes ample water is onsite at no cost to SVG.

4. SVG will obtain AQMD J# prior to commencement of demolition.

5. SVG will utilize wet methods during all concrete cutting and demolition activities.

6. SVG will provide traffic control throughout the duration of our scope.

7. SVG claims all salvage rights.

8. Job duration: (5) working days.

9. Working hours: 7:00am to 4:00pm

10. This bid will expire in 30 days.

Sincerely,

Mike Ruff
Senior Estimator

SV GROUP INC
155 East Main Ave, Suite 110
Morgan Hill, CA 95037
[email protected]
Cell: (408) 318-0701

ENGINEER/NC

ENVIRONMENTAL

SPECIALTY CONTRACT/NC

QUOTATION
Custo m Fencing • Deckin g • Retaining Walls
12 RESIDENTIAL • COMMERCIAL
ST. Lie. No. 1021906 Tel (408) 674-7207 609 Serenade Way, San Jose , CA, 95111

REFERRED BY
QUOTE NO.

PROPOSAL To: J~ red DIRECTIONS TO JOB S ITE
WARRANTY 2.lol\ 1 G ~ m tJ\ i YI d r. 1 SCA rn-Q
HOME PHON H B US PHONE c ta r ct

PRESSUE TREATED PRODUCTS ONLY

WARRANTED FO R ROT & DECAY
Job
Site >
Addr

IF DIFFERE'-T FROM ABOV E
LABOR and MATER IA LS
We propose to furnish O MATERIALS ON LY > as per diagram 0 REPAIR ORDER
TYP E OF TERRAIN OBSTRUC~T~IO=-N~S~--+- --R=-EM~ O~ VA~L=-B=-Y-'---- --1 f\~+ SPEC EQU IP NECESS ACCESS TO JOB

FENCE LIN E MARKED
yes

GUST AVAIL EST R AVAIL
HEIGHT Design
and
Style GENERAL DESCRIPTION OF PRODUCT PURCHASED
~+
Number
of
GATES
, JOB TOTA L $
DEPOSIT $
BALANCE $

REVISION IF NECESSARY
$
$
$
Terms ol Paymenl: PAYMENT IN FULL
t---- - ---------- ---- ----- ----------' UPON COMPLETION OF CONSTRUCTION

SILVE STRE & SON FENCING
• ALL MATERIA L REDWOOD CONSTRUCT ION
GRADE EXCEPT AS OTHERWISE NOTED.
~ s-ty\e ·
Bua rd oYl e>uo rd
~ As pev- our +e\ephone
conveY~ -h'on OuD1e , s

AL L POSTS SET IN CONCRETE
2 FEET EXCEPT AS OTHER WISE NOTED .
400 -f+
,----------, 1,-6\ ,ooo
-1f38Zo e~-tYa
-PbY- zx l.4 on
m i'c\ct le
sti\\ v~ \ ic\ +or- ~Y"o'°t\-ter
30~~lj S ~ f ~e\- C8 \OL\ \-202-2
-t w\\ \ '< e \ U on <Sc\') edu l,V\
CUSTOMER 'S APPRO VA L DATE NEIQHBOl"8 ACCEPTANCE TELEPHONE

1. ESTI MATOR'S SIGNATURE -1Yl a ri n a O ~ \ 0 L\ ,To _ __:_..:::i:....JA"""TE'-+-=-! _: --------------------; 4 .

COMPANY'S ACCEPTANCE
DATE WORK TO COMMENCE _____ _
DATE WORK TO BE COMPLETED ____ _
ACCEPTANCE OF PROPOSAL AND CONTRACT : The
above prices , specifications and conditions are satis­ factory and are hereby accepted . You are authorized
to do the work as specified . Payment will be made
UPON COMPLE.TION .

DATE

DUE TO THE ESCALATING

COSTS OF MATERIA LS
All work will be performed in accordance with standard pracUces. Property lines must be marl<ed by Purchas er and Seller assumes NO RESPONSIBILITY for locaUon of property lines , or any City or County ordinance s regarding helghls . and/or set bacl<a.

Failure to pay as agreed wlll vo4d all Guarantees and/or Warran ties and further, Seller shall have the right to dismanlle and remove from Purchaser •s property without notice . all fencing Instal led by vlrtuo of this order . Purcheae, shall pay Seller •n fuU unleos othorw lae provided In writing . 1 112% shall be charged on delinquent accounts. Shou ld fencing be removed for lack of payment, then all prior payment s mado by the Customer ahan be forfelt od and applied toward Uqukia. t• damag••· Substan ces ftlal will require Jacl<hamme~ng. Blasting , Drllllng or any othe r unique c:ondiUon unknown to the Seller involving e•lra labor costs will result in additional charges apart flom this agreemen t. We are NOT RESPONSIB LE for any type of damage lo pipes , electrtcal, wiring, con· c ,ot• or ohaJ• . Wo a,e •lao not ro•pono lb'9 tor any demogo lo troo~, ohn1ba 1 plonto o r a:oy •nf· mal3 01 any kind.

← All documents from this meeting