Cities Index.
FY 2023/24 Proposed Municipal Fee Schedule

City Council and Authorities Concurrent
April 18, 2023

Document
FY 2023/24 Proposed Municipal Fee Schedule
Meeting
April 18, 2023
Body
City Council and Authorities Concurrent
Original file
3.5 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

FY 2023/24 Municipal Fee Schedule
Proposed
April 18, 2023

This page is intentionally left blank.

I

Page
Reader's Guide….................................................................................................. II List of Separately Published Fee Schedules….......................................................... V Fees Included in this Document:

Citywide…......................................................................................................... 1 - 1 City Clerk…....................................................................................................... 2 - 1 City Manager….................................................................................................. 3 - 1 Community Development
Building…...................................................................................................... 4 - 1 Housing and Community….............................................................................. 4 - 20 Planning…..................................................................................................... 4 - 27 Electric Utility….................................................................................................. 5 - 1 Finance….......................................................................................................... 6 - 1 Fire…................................................................................................................ 7 - 1 Library…........................................................................................................... 8 - 1 Parks and Recreation
Cemetery…................................................................................................... 9 - 1 Recreation…................................................................................................. 9 - 17 Police…............................................................................................................ 10 - 1 Public Works
Engineering…................................................................................................ 11 - 1 Street…........................................................................................................ 11 - 20 Water and Sewer Utilities…................................................................................ 12 - 1 Alphabetical Listing by Fee….................................................................................. 13 - 1 Resolution….......................................................................................................... 14 - 1

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Table of Contents

This page is intentionally left blank.

II

Reader’s Guide

The purpose of this Reader’s Guide is to make the City of Santa Clara FY 2023/24 Municipal Fee Schedule easier to review. The Reader’s Guide highlights information contained in this document, defines terminology used in column headers, and briefly explains how voter approved Proposition 26 impacts the Schedule.

Fees, rates, and charges are intended to encompass all charges established by license, permit fees, utility charges, refuse collection and any other charges for goods and services and use of City -owned or operated facilities. Certain fees omitted from the Municipal Fee Schedule are published separately and noted on page V of this schedul e. Such fees and charges published separately are unique because they are mandated by external agencies or because they receive special attention and review from City Council prior to adoption.

A comprehensive listing of the City’s fees, rates, and charges, arranged in sections by department make up the City of Santa Clara Municipal Fee Schedule. During an annual review, each department recommends appropriate adjustments after considering the total costs to the City for each service provided. Costs include (1) personnel time (providing the service an d collecting data), (2) equipment used, (3) material, service and supply costs, (4) department and City-wide overhead, and (5) any other costs that may be incurred that are directly related to the specific fees, rates or charges. Periodically, the City wil l contract with an outside consultant to perform a comprehensive review/study of fees. For FY 2022/23, ClearSource Financial Consul ting completed a Cost of Services (User Fee) Study. For interim years, the majority of fees are generally proposed to increase by a cost-of-living adjustment, typically calculated as the most recent annual change in the regional consumer price index (CPI) or a change in the organization’s costs . The CPI change for the most recent year was 5.4% . However, the Ci ty is proposing an inflationary factor of 4.61%. This factor represents the percentage growth in the average fully burdened cost of a City posit ion between FY 2022/23 and FY 2023/24. This minor recalibration of fees is simply intended to maintain cost recovery levels consistent with the fees previously adopted by the City Council. In addition to the gen eral inflationary changes proposed for fees, other cost-of-living adjustments implement specific inflators for certain fees, align with mandates, and provide further clarification.

Proposition 26

Proposition 26, passed by voters on November 2, 2010, is a constitutional amendment that introduces, for the first time, a definition of what constitutes a local tax:

As used in this section, “tax” means any levy, charge, or exaction of any kind imposed by a local government…

Under this definition, many requirements imposed by a local government that results in the local government receiving revenues III
are considered local taxes. This means that local government would need to obtain majority approval of the voters if the revenues are to be used for general governmental purpose and by two-thirds of voters if used for a specific purpose. In contrast, a fee may be adopted by a majority vote of City Council. There are seven (7) exceptions to this amendment under Proposition 26:

1. Special Benefit or Privilege: A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege.

2. Government Service or Product: A charge imposed for specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service or product.

3. Licenses and Permits: A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof.

4. Local Government Property: A charge imposed for entrance to or use of local government property, or the purchase, rental or lease of a local government property.

5. Fines and Penalties: A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government, as a result of a violation of law.

6. Property Development: A charge imposed as a condition of property development.

7. The Prop 218 Exception: Provides that property assessment and property -related fees that are already subject to the approval requirements of Proposition 218 are not taxes. Common examples include water and sewer rates and special district assessments such as Landscape and Lighting District Act assessments.

All fees, rates, and charges have been reviewed by the City Attorney’s Office and meet one or more of the exceptions to Proposition 26, or are not subject to Proposition 26.

IV

City of Santa Clara Municipal Fee Schedule Column Descriptors

1. Description of Fee, Rate, or Charge: Identifies the nature of the fee, rate, or charge.

2. Current Fee and Period: Identifies the current cost associated with the fee, rate, or charge.

3. Technology Fee: Identifies whether or not the Technology Fee applies.

4. Charging Dept/Div: City Department responsible for initiating the fee, rate, or charge.

Collecting Dept/Div: City Department assigned to collect the fee, rate, or charge.

5. Date Fee Last Changed: The date the fee was last updated by ordinance and/or resolution.

6. Fee Detail:

Objective: The reasoning as to why the City collects the fee, rate, or charge. This schedule may identify one or more of the following classifications: (1) Recover Cost, (2) User Tax, (3) User Fee, (4) Penalty, (5) Compliance, and (6) Impact Development Fee.

Prop 26 Exception: Identifies exception classification for the fee, rate, or charge. The reader will see numbers 1- 7, or a combination of 1-7, as some fees, rates, and charges fall under multiple classifications. N/A signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Full Cost: Summarizes both direct and indirect costs associated with t he fee, rate, or charge. If no cost is provided, the basis for the charge is defined either by ordinance or resolution, calculated separately based on individual circumstances, or established by an outside entity.

7. Comments: Identifies special notes related to the specific fee, rate, or charge.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E

The Following is a List of Separately Published Fee Schedules.

These Schedules Are Not Included in This Document.

Copies of These Documents Can Be Found in the City Clerk's Office Located at City Hall and at Central Library's Reference Desk.

■ Community Development Department

California Electrical Code
California Administrative Code
California Building Code, Volume 1, 2
California Building Security Code
California Code for the Abatement of
Dangerous Buildings
California Housing Code
California Mechanical Code
California Plumbing Code

■ Electric Utility

Electric Rates

■ Parks and Recreation Department
Class Rates
■ Public Works Department

Cleanup Campaign Rates
Garbage / Rubbish / Recycle Rates
Household Hazardous Waste Rates
Storm Drain Environmental Compliance Fee
■ Water and Sewer Utilities
Sewer Rates
Solar Domestic Hot Water System Service Charges
Solar Swimming Pool Heater Service Charges
Water Rates
■ Taxable items are subject to applicable sales taxes at prevailing tax rates.

V

Municipal Fee Schedule
Citywide

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

CITYWIDE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change Copy Fee Charged By: Date: 6/10/2008 Objective: Recover Cost Copies of Statements of Public $ 0.20 No Citywide Economic Interest (Form 700) $ 0.20 per page Res. No.: 08-7525 Prop 26 Exception: 1,2 and Campaign Statements per page Collected By: are 10 cents per page for
Citywide Full Cost: 0.20$ copies.

CD / DVD Materials $ 3.00 No Charged By: Date: 6/10/2008 Objective: Recover Cost $ 3.00 per Citywide per
CD / DVD Res. No.: 08-7525 Prop 26 Exception: 1,2 CD / DVD Collected By:

Citywide Full Cost: 3.00$
Payment Default Fee $ 25.00 No Charged By: Date: 7/16/2019 Objective: Recover Cost CA Civil Code 1719 $ 25.00 (includes NSF check, Citywide
direct payment decline, O. No.: Prop 26 Exception: 1,2,5 default credit card charge) Collected By: O. Date:

Citywide Full Cost: 25.00$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Reference: CMD 109 1 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

CITYWIDE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Technology Fee $ 3.37% of Yes Charged By: Date: 7/16/2019 Objective: Recover Cost $ 3.37% of Applicable Citywide Applicable
Fees O. No.: Prop 26 Exception: 1,2 Fees
Collected By: O. Date:

Citywide Full Cost: $ Varies
Subpoena Fees $ 275.00 No Charged By: Date: 4/22/2014 Objective: Compliance $ 275.00 Citywide
All Employees O. No.: Prop 26 Exception: * N/A
(Deposit) Collected By: O. Date:

Citywide Other (specify): Full Cost: N/A
CMD 17
Jury Fees $ 30.00 No Charged By: Date: 6/12/2001 Objective: Recover Cost $ 30.00 per day Citywide per day
Federal District Court and IRS O. No.: Prop 26 Exception: * N/A and IRS Business Collected By: O. Date: Business
Mileage Citywide Other (specify): Full Cost: N/A Mileage Rate CMD 25 Rate
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 1 - 2 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
City
Clerk

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

CITY CLERK'S OFFICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

Lobbying Activities $ 731.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 764.00 4.5% Annual Registration Fee City Clerk's Office User Fee
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
City Clerk's Office
Full Cost: 764.70$
Lobbying Activities $ 344.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Persons registering for the $ 359.00 4.4% Prorated Registration Fee City Clerk's Office User Fee first time after June 30th of a R. No.: 22-9081 Prop 26 Exception: 3 given year.

Collected By: R. Date: 4/19/2022
City Clerk's Office
Full Cost: 359.86$
Lobbyists with a change to
Lobbying Activities $ 172.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost registration information shall $ 179.00 4.1% Amended Registration Fee City Clerk's Office User Fee file an amended registration R. No.: 22-9081 Prop 26 Exception: 3 within fifteen (15) days of such Collected By: R. Date: 4/19/2022 change if he or she has City Clerk's Office accepted a new client for
Full Cost: 179.93$ compensation in excess of five hundred dollars ($500.00).

Annual registration is due by
January 15th of a given year.

CURRENT
FEE
and
PERIOD
(SEE READER'S GUIDE)

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
Reference: CMD 109 2 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

CITY CLERK'S OFFICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CURRENT
FEE
and
PERIOD
(SEE READER'S GUIDE)

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
Lobbying Activities $ 129.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 134.00 3.9% Client Registration Fee per client City Clerk's Office User Fee per client R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
City Clerk's Office
Full Cost: 134.95$
Lobbying Activities $ 25.00 No Charged By: Date: 12/5/2017 Objective: Recover Cost Up to a maximum of $500.00 $ 25.00 Delinquent Fee per day City Clerk's Office Penalty per day (Non-Compliance Fine) Res. No.: 17-8483 Prop 26 Exception: 5 Collected By:

City Clerk's Office O. No.: 1949
O. Date: 1/12/2016 Full Cost: 25.00$
Reference: CMD 109 2 - 2 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
City
Manager

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

CITY MANAGER'S OFFICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change No-Fee Parade Permit Charged By: Date: 9/18/2018 Objective: See Resolution No. 18-8606 For Santa Clara non-profit $ No Fee No City Manager's $ No Fee organizations Office R. No.: 18-8606 Prop 26 Exception:

R. Date: 9/18/2018
Collected By: Full Cost: -$
City Manager's
Office

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Reference: CMD 109 3 - 1 Form: FEEFORM Revised: May 2011

This page is intentionally left blank.

Municipal Fee Schedule
Community Development

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

MINOR RESIDENTIAL
COMBINATION PERMIT FEES Fee amount is inclusive
of permit issuance fee.

A/C (with or w/o Furnace) - Relocation $ 460.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 -16.5% A/C and/or Furnace - New Location Building Division Additional fees apply R. No.: 22-9081 Prop 26 Exception: 1,2 (e.g., permit issuance fee Collected By: R. Date: 4/19/2022 and technology fee)
Building Division
Full Cost: 384.96$ Separating permit issuance
fee and clarify fee description.

Fee amount is inclusive
A/C (with or w/o Furnace) - Same Location $ 312.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 154.00 -50.6% A/C and/or Furnace - Same Location Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 154.82$
Separating permit issuance
fee and clarify fee description.

Fee amount is inclusive
Furnace Replacement - Relocation $ 460.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 384.00 -16.5% A/C and/or Furnace - New Location Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 384.96$
Separating permit issuance
fee and clarify fee description.

Fee amount is inclusive
Furnace Replacement - Same Location $ 312.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 230.00 -26.3% A/C and/or Furnace - Same Location Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 230.14$
Separating permit issuance
fee and clarify fee description.

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Reference: CMD 109 4 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Fee amount is inclusive
New Tankless Water Heater $ 388.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 309.00 -20.4% (for like for like water heater permit Building Division fees, see Section 3-C Plumbing R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Permit fees) Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Water Heater - New or Replacement Full Cost: 309.65$
Separating permit issuance
fee and clarify fee description.

Fee amount is inclusive
Water Heater - Relocate Existing $ 388.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 309.00 -20.4% Water Heater Building Division
(for like for like water heater permit R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply fees, see Section 3-C Plumbing Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Permit fees) Building Division and technology fee)
Full Cost: 309.65$
Water Heater - New or Replacement Separating permit issuance fee and clarify fee description.

PERMIT ISSUANCE FEE
Permit Issuance $ 91.67 Yes Charged By: Date: 4/19/2022 Objective: $ 95.00 3.6% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 95.89$
Technology Fee 3.37% of Building Permit Fee, No Charged By: Date: 7/16/2019 Objective: Recover Cost 3.37% of Building Permit Fee, Electrical Permit Fee, Building Division Electrical Permit Fee, Plumbing Permit Fee, R. No.: Prop 26 Exception: 1,2 Plumbing Permit Fee, Mechanical Permit Fee, and Collected By: R. Date: Mechanical Permit Fee, and Plan Check & Sign Fee Building Division Plan Check & Sign Fee Full Cost: 3.37%
General Plan / Advanced Planning 12.39% of Building No Charged By: Date: 7/16/2019 Objective: Recover Cost 12.39% of Building Surcharge Permit and Plan Check Fees Planning Division Permit and Plan Check Fees R. No.: Prop 26 Exception: 1,2
Collected By: R. Date:

Building Division
Full Cost: 12.39%
Reference: CMD 109 4 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Building Conformance Fee Valuation x $0.00032 No Charged By: Date: 6/22/2021 Objective: Recover Cost Valuation x $0.00032 Building Division
R. No.: 21-8981 Prop 26 Exception: 1,2
Collected By: R. Date: 6/22/2021
Building Division Full Cost:
3-B ELECTRICAL

PERMIT FEES
Charged By: Date: 4/19/2022 Objective:

Minimum Permit Fee $ 220.00 Yes Building Division $ 230.00 4.5% R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 230.14$
SYSTEM FEE SCHEDULE Objective:

Prop 26 Exception: 1,2,3
New Buildings or Alterations Charged By: Date: 4/19/2022 Commercial Buildings per sq. ft. $ 0.31 Yes Building Division Full Cost: 0.32$ $ 0.32 4.6% R. No.: 22-9081
Residential Buildings per sq. ft. $ 0.22 Yes Collected By: R. Date: 4/19/2022 Full Cost: 0.23$ $ 0.23 4.6% Building Division
New garages, carports and $ 0.09 Yes $ 0.09 4.6%
accessory buildings per sq. ft. Full Cost: 0.09$
Private Swimming Pools Charged By: Date: 6/22/2021 Objective:

For new private, in-ground $ 330.00 Yes Building Division $ 345.00 4.5% swimming pools for single-family and R. No.: 21-8981 Prop 26 Exception: 1,2,3 multi-family occupancies Collected By: R. Date: 6/22/2021 Building Division
Full Cost: $345.21
Objective:

Outdoor Events Charged By: Date: 6/22/2021 Prop 26 Exception: 1,2,3 For electric generators and $ 330.00 Yes Building Division Full Cost: 345.21$ $ 345.00 4.5% electrically driven rides R. No.: 21-8981
Collected By: R. Date: 6/22/2021
For mechanically driven rides and $ 330.00 Yes Building Division Full Cost: 345.21$ $ 345.00 4.5% walk-through attractions or
displays having electric lighting
For a system of area and booth lighting $ 330.00 Yes Full Cost: 345.21$ $ 345.00 4.5% Valuation x
$0.00032
Reference: CMD 109 4 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Objective:

Temporary Power Service Charged By: Date: 6/22/2021 Prop 26 Exception: 1,2,3 For a temporary service power pole or $ 330.00 Yes Building Division Full Cost: 345.21$ $ 345.00 4.5% pedestal-mounted receptacle outlets and R. No.: 21-8981 appurtenances Collected By: R. Date: 6/22/2021
Building Division
For a temporary distribution system and $ 330.00 Yes Full Cost: 345.21$ $ 345.00 4.5% temp lighting and receptacle outlets for
construction sites, decorative lights,
Christmas tree sales lots,
fireworks stands, etc.

UNIT FEE SCHEDULE
Objective:

Receptacle, Switch and Lighting Charged By: Date: 4/19/2022 Prop 26 Exception: 1,3 Outlets Building Division
First 20, each $ 3.67 Yes R. No.: 22-9081 Full Cost: 3.84$ $ 3.84 4.6% Collected By: R. Date: 4/19/2022
Additional fixtures, each $ 2.75 Yes Building Division Full Cost: 2.88$ $ 2.88 4.6% Objective:

Lighting Fixtures Charged By: Date: 4/19/2022 Prop 26 Exception: 1,3 First 20 fixtures, each $ 3.67 Yes Building Division Full Cost: 3.84$ $ 3.84 4.6% R. No.: 22-9081
Additional fixtures, each $ 2.75 Yes Collected By: R. Date: 4/19/2022 Full Cost: 2.88$ $ 2.88 4.6% Building Division
For pole or platform-mounted lighting $ 7.00 Yes Full Cost: 7.67$ $ 7.00 fixtures, each
For theatrical-type lighting fixtures or $ 7.00 Yes Full Cost: 7.67$ $ 7.00 assemblies, each
Residential Appliances Charged By: Date: 4/28/2020 Objective:

For fixed residential appliances or $ 22.00 Yes Building Division $ 23.00 4.5% receptacle outlets, each R. No.: Prop 26 Exception: 1,3 Collected By: R. Date:

Building Division
Full Cost: 23.01$
Objective:

Power Apparatus Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 Up to and including 1, each $ 36.67 Yes Building Division Full Cost: 38.36$ $ 38.00 3.6% Over 1 and not over 10, each $ 55.00 Yes R. No.: 22-9081 Full Cost: 57.54$ $ 57.00 3.6% Over 10 and not over 50, each $ 91.67 Yes Collected By: R. Date: 4/19/2022 Full Cost: 95.89$ $ 95.00 3.6% Over 50 and not over 100, each $ 110.00 Yes Building Division Full Cost: 115.07$ $ 115.00 4.5% Over 100, each $ 146.67 Yes Full Cost: 153.43$ $ 153.00 4.3% Reference: CMD 109 4 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Busways Charged By: Date: 4/19/2022 Objective:

For trolley and plug-in-type busways, $ 91.67 Yes Building Division $ 95.00 3.6% each 100 feet R. No.: 22-9081 Prop 26 Exception: 1,2,3
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 95.89$
Objective:

Signs, Outline Lighting and Marquees Prop 26 Exception: 1,2,3 For signs, outline lighting systems or $ 91.67 Yes Charged By: Date: 4/19/2022 Full Cost: 95.89$ $ 95.00 3.6% marquees supplies from one branch Building Division
circuit R. No.: 22-9081
Collected By: R. Date: 4/19/2022
For additional branch circuits with $ 73.00 Yes Building Division Full Cost: 76.71$ $ 76.00 4.1% the same sign, outline lighting system or
marquee
Objective:

Services Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 For services of 600 volts or less and $ 146.67 Yes Building Division Full Cost: 153.43$ $ 153.00 4.3% not over 200 amperes in rating, each R. No.: 22-9081
Collected By: R. Date: 4/19/2022
For services of 600 volts or less and $ 256.67 Yes Building Division Full Cost: 268.50$ $ 268.00 4.4% over 200 amperes to 1,000 amperes
in rating, each
For services over 600 volts or $ 385.00 Yes Full Cost: 402.75$ $ 402.00 4.4% over 1,000 amperes in rating, each
Miscellaneous Apparatus, Conduits,
and Conductors Charged By: Date: 4/19/2022 Objective:

For electrical apparatus, conduits, and $ 91.67 Yes Building Division $ 95.00 3.6% conductors for which a permit is required R. No.: 22-9081 Prop 26 Exception: 1,2,3 but for which no fee is herein set forth Collected By: R. Date: 4/19/2022 Building Division
Full Cost: 95.89$
3-C MECHANICAL PERMIT
NEW BUILDINGS Objective:

Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3
New Commercial buildings, per sq. ft. $ 0.26 Yes Building Division Full Cost: 0.28$ $ 0.27 4.6% R. No.: 22-9081
New Residential buildings, per sq. ft. $ 0.09 Yes Collected By: R. Date: 4/19/2022 Full Cost: 0.09$ $ 0.09 4.6% Building Division
Reference: CMD 109 4 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

UNIT FEE SCHEDULE
Objective:

Furnaces Charged By: Date: 6/22/2021 Prop 26 Exception: 1,2,3 For installation or relocation of $ 275.00 Yes Building Division Full Cost: 287.68$ $ 287.00 4.4% forced-air or gravity-type furnace, R. No.: 21-8981
up to and including 100,000 Btu/h Collected By: R. Date: 6/22/2021 Building Division
For installation or relocation or $ 275.00 Yes Full Cost: 287.68$ $ 287.00 4.4% forced-air or gravity-type furnace,
over 100,000 Btu/h
For installation or relocation of $ 275.00 Yes Full Cost: 287.68$ $ 287.00 4.4% each floor furnace
For installation or relocation of each $ 275.00 Yes Full Cost: 287.68$ $ 287.00 4.4% suspended heater, recessed wall
heater or floor-mounted unit
Appliance Vents Charged By: Date: 6/22/2021 Objective:

For the installation, relocation or $ 440.00 Yes Building Division $ 460.00 4.5% replacement of each appliance vent R. No.: 21-8981 Prop 26 Exception: 1,2,3 not included in an appliance permit Collected By: R. Date: 6/22/2021 Building Division
Full Cost: 460.28$
Repairs or Additions Charged By: Date: 6/22/2021 Objective:

For the repair or, alteration of, or $ 440.00 Yes Building Division $ 460.00 4.5% additional to each R. No.: 21-8981 Prop 26 Exception: 1,2,3 Collected By: R. Date: 6/22/2021
Building Division
Full Cost: 460.28$
Reference: CMD 109 4 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Objective:

Boilers, Compressors and Prop 26 Exception: 1,2,3
Absorption Systems Charged By: Date: 4/19/2022
Up to and including 3 horsepower or $ 385.00 Yes Building Division Full Cost: 402.75$ $ 402.00 4.4% up to and including 100,000 Btu/h R. No.: 22-9081
Collected By: R. Date: 4/19/2022
Over 3 horsepower to and $ 440.00 Yes Building Division Full Cost: 460.28$ $ 460.00 4.5% including 15 horsepower or
Over 100,000 Btu/h to and
including 500,000 Btu/h
Over 15 to and including $ 476.67 Yes Full Cost: 498.64$ $ 498.00 4.5% 30 horsepower or Over 500,000 to
and including 1,000,000 Btu/h
Over 30 to and including $ 531.67 Yes Full Cost: 556.18$ $ 556.00 4.6% 50 horsepower or Over 1,000,000 to
and including 1,750,000 Btu/h
Over 50 horsepower or $ 586.67 Yes Full Cost: 613.71$ $ 613.00 4.5% Over 1,750,000 Btu/h
Objective:

Air Handlers Charged By: Date: 6/22/2021 Prop 26 Exception: 1,2,3 Each unit up to and including $ 293.00 Yes Building Division Full Cost: 306.86$ $ 306.00 4.4% 10,000 cubic feet per minute R. No.: 21-8981
Collected By: R. Date: 6/22/2021
Each unit Over 10,000 cfm $ 440.00 Yes Building Division Full Cost: 460.28$ $ 460.00 4.5% Evaporative Coolers Charged By: Date: 6/22/2021 Objective:

For each evaporative cooler other than $ 440.00 Yes Building Division $ 460.00 4.5% portable type R. No.: 21-8981 Prop 26 Exception: 1,2,3
Collected By: R. Date: 6/22/2021
Building Division
Full Cost: 460.28$
Reference: CMD 109 4 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Objective:

Ventilation and Exhaust Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 For each ventilation fan connected to $ 91.67 Yes Building Division Full Cost: 95.89$ $ 95.00 3.6% a single duct R. No.: 22-9081
Collected By: R. Date: 4/19/2022
For each ventilation system which $ 165.00 Yes Building Division Full Cost: 172.61$ $ 172.00 4.2% is not a portion of any heating or
air-conditioning system authorized by
a permit
For the installation of each hood which is $ 440.00 Yes Full Cost: 460.28$ $ 460.00 4.5% served by mechanical exhaust
Objective:

Incinerators Charged By: Date: 6/22/2021 Prop 26 Exception: 1,2,3 For the installation or relocation of $ 220.00 Yes Building Division Full Cost: 230.14$ $ 230.00 4.5% each domestic-type incinerator R. No.: 21-8981
Collected By: R. Date: 6/22/2021
For the installation or relocation of $ 440.00 Yes Building Division Full Cost: 460.28$ $ 460.00 4.5% each commercial or
industrial-type incinerator
Miscellaneous Charged By: Date: 6/22/2021 Objective:

For each appliance or piece of $ 440.00 Yes Building Division $ 460.00 4.5% equipment regulated by the R. No.: 21-8981 Prop 26 Exception: 1,2,3 Mechanical Code but not classified in Collected By: R. Date: 6/22/2021 other appliance categories Building Division
Full Cost: 460.28$
3-C PLUMBING
PERMIT FEES Objective:

NEW BUILDINGS Prop 26 Exception: 1,2,3
Charged By: Date: 4/19/2022
New Commercial buildings, per sq. ft. $ 0.20 Yes Building Division Full Cost: 0.21$ $ 0.21 4.6% R. No.: 22-9081
New Residential buildings, per sq. ft. $ 0.09 Yes Collected By: R. Date: 4/19/2022 Full Cost: 0.09$ $ 0.09 4.6% Building Division
Reference: CMD 109 4 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
UNIT FEE SCHEDULE Objective:

Prop 26 Exception: 1,2,3
Fixtures and Vents Charged By: Date: 6/22/2021
For each plumbing fixture or trap or $ 220.00 Yes Building Division Full Cost: 230.14$ $ 230.00 4.5% set of fixtures on one trap R. No.: 21-8981
Collected By: R. Date: 6/22/2021
For repair or alteration of drainage or $ 220.00 Yes Building Division Full Cost: 230.14$ $ 230.00 4.5% vent piping, each fixture
Objective:

Sewers, Disposal Systems and Prop 26 Exception: 1,2,3
Interceptors Charged By: Date: 4/19/2022
For each building sewer and $ 220.00 Yes Building Division Full Cost: 230.14$ $ 230.00 4.5% each trailer park sewer R. No.: 22-9081
Collected By: R. Date: 4/19/2022
For each cesspool $ 91.67 Yes Building Division Full Cost: 95.89$ $ 95.00 3.6% For each private sewage disposal $ 91.67 Yes Full Cost: 95.89$ $ 95.00 3.6% system
For each industrial waste $ 220.00 Yes Full Cost: 230.14$ $ 230.00 4.5% pretreatment interceptor
Rainwater systems - per drain $ 55.00 Yes Full Cost: 57.54$ $ 57.00 3.6% Objective:

Water Piping and Water Heaters Charged By: Date: 6/22/2021 Prop 26 Exception: 1,2,3 For installation, alteration, or repair of $ 220.00 Yes Building Division Full Cost: 230.14$ $ 230.00 4.5% water piping and/or water-treating R. No.: 21-8981
equipment Collected By: R. Date: 6/22/2021
Building Division
For each water heater including vent $ 220.00 Yes Full Cost: 230.14$ $ 230.00 4.5% Fee amount is inclusive
Water Softener $ 312.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 230.00 -26.3% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 230.14$
Separating permit issuance
fee.

Reference: CMD 109 4 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Fee amount is inclusive
Water Heater - Same Location $ 388.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 230.00 -40.7% (like for like) Building Division
Water Heater - New or Replacement R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 230.14$
Separating permit issuance
fee and clarify fee description.

Gas Piping Systems Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 For each gas piping system of $ 146.67 Yes Building Division Full Cost: 153.43$ $ 153.00 4.3% one to five outlets R. No.: 22-9081
Collected By: R. Date: 4/19/2022
For each additional outlet over five $ 5.50 Yes Building Division Full Cost: 5.75$ $ 5.70 3.6% Objective:

Lawn Sprinklers, Vacuum Breakers Prop 26 Exception: 1,2,3 and Backflow Protection Devices Charged By: Date: 4/19/2022 For each lawn sprinkler system on $ 220.00 Yes Building Division Full Cost: 230.14$ $ 230.00 4.5% any one meter R. No.: 22-9081
Collected By: R. Date: 4/19/2022
For atmospheric-type vacuum $ 91.67 Yes Building Division Full Cost: 95.89$ $ 95.00 3.6% breakers or backflow protection
1 to 5 devices
Over 5 devices, each $ 18.00 Yes Full Cost: 19.18$ $ 18.00 For each backflow protective device $ 220.00 Yes Full Cost: 230.14$ $ 230.00 4.5% other than atmospheric-type
vacuum breakers 2 in and smaller
Over 2 in $ 220.00 Yes Full Cost: 230.14$ $ 230.00 4.5% Objective:

Swimming Pools Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 Public pool $ 660.00 Yes Building Division Full Cost: 690.43$ $ 690.00 4.5% R. No.: 22-9081
Public spa $ 550.00 Yes Collected By: R. Date: 4/19/2022 Full Cost: 575.36$ $ 575.00 4.5% Building Division
Private pool $ 550.00 Yes Full Cost: 575.36$ $ 575.00 4.5% Private spa $ 440.00 Yes Full Cost: 460.28$ $ 460.00 4.5% Reference: CMD 109 4 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Miscellaneous Charged By: Date: 6/22/2021 Objective:

For each appliance or piece of $ 220.00 Yes Building Division $ 230.00 4.5% equipment regulated by the R. No.: 21-8981 Prop 26 Exception: 1,2,3 Plumbing Code but not classified in Collected By: R. Date: 6/22/2021 other appliance categories Building Division
Full Cost: 230.14$
3-G GRADING
PLAN REVIEW FEES Objective:

Prop 26 Exception: 1,2,3
50 cubic yards or less $ No Fee Yes Charged By: Date: 4/19/2022 Full Cost: -$ $ No Fee 51 to 100 cubic yards $ 330.00 Yes Building Division Full Cost: 345.21$ $ 345.21 4.6% 101 to 1,000 cubic yards $ 880.00 Yes R. No.: 22-9081 Full Cost: 920.57$ $ 920.56 4.6% 1,001 to 10,000 cubic yards $ 1,320.00 Yes Collected By: R. Date: 4/19/2022 Full Cost: 1,380.85$ $ 1,380.85 4.6% 10,001 to 100,000 cubic yards - base $ 2,200.00 Yes Building Division Full Cost: 2,301.42$ $ 2,301.42 4.6% Each additional 10,000 cubic yards $ 97.78 Yes Full Cost: 102.29$ $ 102.28 4.6% 100,001 to 200,000 cubic yards - base $ 3,080.00 Yes Full Cost: 3,221.99$ $ 3,221.98 4.6% Each additional 10,000 cubic yards $ 220.00 Yes Full Cost: 230.14$ $ 230.14 4.6% 200,001 cubic yards or more - base $ 5,280.00 Yes Full Cost: 5,523.41$ $ 5,523.40 4.6% Each additional 10,000 cubic yards $ 110.00 Yes Full Cost: 115.07$ $ 115.07 4.6% 3-H GRADING
PERMIT FEES Objective:

Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3
100 cubic yards or less $ 440.00 Yes Building Division Full Cost: 460.28$ $ 460.28 4.6% 101 to 1,000 cubic yards - base $ 440.00 Yes R. No.: 22-9081 Full Cost: 460.28$ $ 460.28 4.6% Each additional 100 cubic yards $ 73.00 Yes Collected By: R. Date: 4/19/2022 Full Cost: 76.71$ $ 76.36 4.6% 1,001 to 10,000 cubic yards - base $ 1,100.00 Yes Building Division Full Cost: 1,150.71$ $ 1,150.71 4.6% Each additional 1,000 cubic yards $ 49.00 Yes Full Cost: 51.26$ $ 51.25 4.6% 10,001 to 100,000 cubic yards - base $ 1,540.00 Yes Full Cost: 1,610.99$ $ 1,610.99 4.6% Each additional 10,000 cubic yards $ 195.56 Yes Full Cost: 204.57$ $ 204.57 4.6% 100,001 cubic yards or more - base $ 3,300.00 Yes Full Cost: 3,452.13$ $ 3,452.13 4.6% Each additional 10,000 cubic yards $ 97.78 Yes Full Cost: 102.29$ $ 102.28 4.6% 3-I OTHER INSPECTIONS

AND FEES
Charged By: Date: 4/19/2022 Objective:

Inspections outside of $ 285.00 Yes Building Division $ 298.00 4.6% normal business hours (per hour) R. No.: 22-9081 Prop 26 Exception: 3 (Min of 2 hours) Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 298.14$
Reference: CMD 109 4 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Re-inspection fees assessed under $ 220.00 Yes Charged By: Date: 6/22/2021 Objective: $ 230.00 4.5% provisions of Section 305.8 (per hour) Building Division R. No.: 21-8981 Prop 26 Exception: 3
Collected By: R. Date: 6/22/2021
Building Division
Full Cost: 230.14$
Inspections for which no fee is $ 220.00 Yes Charged By: Date: 6/22/2021 Objective: $ 230.00 4.5% specifically indicated (per hour) Building Division
R. No.: 21-8981 Prop 26 Exception: 3
Collected By: R. Date: 6/22/2021
Building Division
Full Cost: 230.14$
Additional plan review required by $ 220.00 Yes Charged By: Date: 4/19/2022 Objective: $ 230.00 4.5% changes, additions or revisions to Building Division
approved plans (per hour) R. No.: 22-9081 Prop 26 Exception: 1,3 Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 230.14$
For use of outside consultants for $ No Fee Yes Charged By: Date: 4/28/2020 Objective: $ No Fee plan checking and inspections Building Division
R. No.: Prop 26 Exception:

Collected By: R. Date:

Building Division
Full Cost: -$
Plan Review outside of $ 285.00 Yes Charged By: Date: 4/19/2022 Objective: $ 298.00 4.6% normal business hours (per hour) Building Division
(Min of 2 hours) R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 298.14$
Phased Plan Check $ 25% of original Yes Charged By: Date: 4/19/2022 Objective: $ 25% of original (for each phase) plan review fee Building Division plan review fee R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 25% of PC
Reference: CMD 109 4 - 12 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Master Plan Fee $ 25% of original Yes Date: 4/19/2022 Objective: $ 25% of original plan review fee plan review fee
R. No.: 22-9081 Prop 26 Exception: 3
R. Date: 4/19/2022
Full Cost: 25% of PC
Alternate Materials & Methods Review $ 220.00 Yes Date: 4/19/2022 Objective: $ 230.00 4.5% (per hour)
R. No.: 22-9081 Prop 26 Exception: 3
R. Date: 4/19/2022
Full Cost: 230.14$
Temporary Certificate of Occupancy $ 1,045.00 Yes Charged By: Date: 4/19/2022 Objective: $ 1,150.00 10.0% Building Division
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 1,150.71$
Permit to Final (per trade) $ 220.00 Yes Charged By: Date: 4/19/2022 Objective: $ 230.00 4.5% (minimum 1-hour per trade) Building Division
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 230.14$
Replacement of Job Card $ 55.00 Yes Charged By: Date: 4/19/2022 Objective: $ 57.00 3.6% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 57.54$
Reference: CMD 109 4 - 13 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Application Extension $ 91.67 Yes Charged By: Date: 4/19/2022 Objective: $ 95.00 3.6% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2,3
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 95.89$
Permit Extension $ 91.67 Yes Charged By: Date: 4/19/2022 Objective: $ 95.00 3.6% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,3
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 95.89$
Replacement Permit $ 92.00 Yes Charged By: Date: 4/19/2022 Objective: $ 96.00 4.3% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 95.89$
Addressing $ 220.00 Yes Charged By: Date: 4/19/2022 Objective: $ 230.00 4.5% (per hour - two hour minimum) Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 230.14$
Plan Duplication of lost plan set $ 91.67 Yes Charged By: Date: 4/19/2022 Objective: $ 95.00 3.6% (up to 20 pages) Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 95.89$
Review and stamp transfer of $ 91.67 Yes Charged By: Date: 4/19/2022 Objective: $ 95.00 3.6% lost plan set Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Building Division
Full Cost: 95.89$
Reference: CMD 109 4 - 14 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Photovoltaic - Residential Charged By: Date: 6/22/2021 Objective: See Gov't Code 66015 15KW or less $ 450.00 Yes Building Division $ 450.00
Per KW above 15 $ 15.00 Yes R. No.: 21-8981 Prop 26 Exception: 1,2,3 $ 15.00 Collected By: R. Date: 6/22/2021
Building Division
Full Cost: Set by State
Photovoltaic - Commercial Charged By: Date: 6/22/2021 Objective: See Gov't Code 66015 50KW or less $ 1,000.00 Yes Building Division $ 1,000.00 Between 50KW and 250 KW (base) $ 1,000.00 Yes R. No.: 21-8981 Prop 26 Exception: 1,2,3 $ 1,000.00 Between 50KW and 250 KW (per KW) $ 7.00 Yes Collected By: R. Date: 6/22/2021 $ 7.00 Greater than 250 KW (base) $ 2,400.00 Yes Building Division $ 2,400.00 Greater than 250 KW (per KW) $ 5.00 Yes Full Cost: Set by State $ 5.00 Photovoltaic - Solar Thermal Charged By: Date: 6/22/2021 Objective: See Gov't Code 66015 10kwth or less $ 450.00 Yes Building Division $ 450.00
Greater than 10kwth (base) $ 450.00 Yes R. No.: 21-8981 Prop 26 Exception: 1,2,3 $ 450.00 Per kwth above 10kwth $ 15.00 Yes Collected By: R. Date: 6/22/2021 $ 15.00 Building Division
Full Cost: Set by State
Fee amount is inclusive
Bathroom Remodel (like for like) $ 312.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 230.00 -26.3% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 230.14$
Separating permit issuance
fee and clarify fee description.

Fee amount is inclusive
Foundation Repair / Seismic Upgrade $ 422.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 345.00 -18.2% Residential Voluntary Foundation Seismic Building Division Retrofit R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 345.21$
Separating permit issuance
fee and clarify fee description.

Reference: CMD 109 4 - 15 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
Fee amount is inclusive
Pool Demo $ 312.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 230.00 -26.3% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 230.14$
Separating permit issuance
fee.

Fee amount is inclusive
Residential Reroof $ 734.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost of permit issuance fee. $ 671.00 -8.6% Building Division
R. No.: 22-9081 Prop 26 Exception: 1,2 Additional fees apply Collected By: R. Date: 4/19/2022 (e.g., permit issuance fee Building Division and technology fee)
Full Cost: 671.60$
Separating permit issuance
fee.

SINGLE-FAMILY / DUPLEX /
ADDITIONAL DWELLING UNIT Objective:

RESIDENTIAL Prop 26 Exception: 1,2,3

SCALED PERMIT FEE

PLAN CHECK
Charged By: Date: 4/19/2022
Project Size Building Division
1 to 250 sq. ft. $ 660.00 Yes R. No.: 22-9081 Full Cost: 690.43$ $ 690.43 4.6% Collected By: R. Date: 4/19/2022
251 to 1,000 sq. ft. Building Division
First 250 sq. ft. $ 660.00 Yes Full Cost: 690.43$ $ 690.43 4.6% Each additional 100 sq. ft. or $ 264.00 Yes Full Cost: 276.17$ $ 276.17 4.6% fraction thereof
1,001 to 3,000 sq. ft.

First 1,000 sq. ft. $ 2,640.00 Yes Full Cost: 2,761.70$ $ 2,761.70 4.6% Each additional 100 sq. ft. or $ 132.00 Yes Full Cost: 138.09$ $ 138.09 4.6% fraction thereof
3,001 to +
First 3,000 sq. ft. $ 5,280.00 Yes Full Cost: 5,523.41$ $ 5,523.41 4.6% Each additional 100 sq. ft. or $ 66.00 Yes Full Cost: 69.04$ $ 69.04 4.6% fraction thereof
Reference: CMD 109 4 - 16 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
INSPECTION Objective:

Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3
Project Size Building Division
1 to 250 sq. ft. $ 732.60 Yes R. No.: 22-9081 Full Cost: 766.37$ $ 766.37 4.6% Collected By: R. Date: 4/19/2022
251 to 1,000 sq. ft. Building Division
First 250 sq. ft. $ 732.60 Yes Full Cost: 766.37$ $ 766.37 4.6% Each additional 100 sq. ft. or $ 224.99 Yes Full Cost: 235.36$ $ 235.36 4.6% fraction thereof
1,001 to 3,000 sq. ft.

First 1,000 sq. ft. $ 2,420.00 Yes Full Cost: 2,531.56$ $ 2,531.56 4.6% Each additional 100 sq. ft. or $ 190.63 Yes Full Cost: 199.42$ $ 199.42 4.6% fraction thereof
3,001 to +
First 3,000 sq. ft. $ 6,232.60 Yes Full Cost: 6,519.92$ $ 6,519.92 4.6% Each additional 100 sq. ft. or $ 95.32 Yes Full Cost: 99.71$ $ 99.71 4.6% fraction thereof
Reference: CMD 109 4 - 17 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

COMMERCIAL / MULTI-FAMILY /
INDUSTRIAL Objective:

SCALED PERMIT FEE Prop 26 Exception: 1,2,3,6

PLAN CHECK
Charged By: Date: 4/19/2022
Project Valuation Building Division
$1 to $1,000 $ 110.00 Yes R. No.: 22-9081 Full Cost: 115.07$ $ 115.07 4.6% Collected By: R. Date: 4/19/2022
$1,001 to $10,000 Building Division
First $1,000 $ 110.00 Yes Full Cost: 115.07$ $ 115.07 4.6% Each additional $1,000 or fraction thereof $ 18.33 Yes Full Cost: 19.18$ $ 19.18 4.6% $10,001 to $75,000
First $10,000 $ 275.00 Yes Full Cost: 287.68$ $ 287.68 4.6% Each additional $1,000 or fraction thereof $ 16.08 Yes Full Cost: 16.82$ $ 16.82 4.6% $75,001 to $150,000
First $75,000 $ 1,320.00 Yes Full Cost: 1,380.85$ $ 1,380.85 4.6% Each additional $1,000 or fraction thereof $ 20.53 Yes Full Cost: 21.48$ $ 21.48 4.6% $150,001 to $750,000
First $150,000 $ 2,860.00 Yes Full Cost: 2,991.85$ $ 2,991.85 4.6% Each additional $1,000 or fraction thereof $ 7.15 Yes Full Cost: 7.48$ $ 7.48 4.6% $750,001 to $3,000,000
First $750,000 $ 7,150.00 Yes Full Cost: 7,479.62$ $ 7,479.62 4.6% Each additional $1,000 or fraction thereof $ 5.04 Yes Full Cost: 5.27$ $ 5.27 4.6% $3,000,001 to $10,000,000
First $3,000,000 $ 18,480.00 Yes Full Cost: 19,331.93$ $ 19,331.93 4.6% Each additional $1,000 or fraction thereof $ 2.95 Yes Full Cost: 3.09$ $ 3.09 4.6% $10,000,001 to +
First $10,000,000 $ 39,160.00 Yes Full Cost: 40,965.28$ $ 40,965.28 4.6% Each additional $1,000 or fraction thereof $ 1.48 Yes Full Cost: 1.55$ $ 1.55 4.6% Reference: CMD 109 4 - 18 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / BUILDING RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

OR REVISED FEE
2023-24

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW
INSPECTION PERMIT Objective:

Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3
Project Valuation Building Division
$1 to $1,000 $ 110.00 Yes R. No.: 22-9081 Full Cost: 115.07$ $ 115.07 4.6% Collected By: R. Date: 4/19/2022
$1,001 to $10,000 Building Division
First $1,000 $ 110.00 Yes Full Cost: 115.07$ $ 115.07 4.6% Each additional $1,000 or fraction thereof $ 36.58 Yes Full Cost: 38.27$ $ 38.27 4.6% $10,001 to $75,000
First $10,000 $ 439.23 Yes Full Cost: 459.48$ $ 459.48 4.6% Each additional $1,000 or fraction thereof $ 20.32 Yes Full Cost: 21.26$ $ 21.26 4.6% $75,001 to $150,000
First $75,000 $ 1,760.00 Yes Full Cost: 1,841.14$ $ 1,841.14 4.6% Each additional $1,000 or fraction thereof $ 23.47 Yes Full Cost: 24.55$ $ 24.55 4.6% $150,001 to $750,000
First $150,000 $ 3,520.00 Yes Full Cost: 3,682.27$ $ 3,682.27 4.6% Each additional $1,000 or fraction thereof $ 8.80 Yes Full Cost: 9.21$ $ 9.21 4.6% $750,001 to $3,000,000
First $750,000 $ 8,800.00 Yes Full Cost: 9,205.68$ $ 9,205.68 4.6% Each additional $1,000 or fraction thereof $ 3.91 Yes Full Cost: 4.09$ $ 4.09 4.6% $3,000,001 to $10,000,000
First $3,000,000 $ 17,600.00 Yes Full Cost: 18,411.36$ $ 18,411.36 4.6% Each additional $1,000 or fraction thereof $ 3.65 Yes Full Cost: 3.81$ $ 3.81 4.6% $10,000,001 to +
First $10,000,000 $ 43,120.00 Yes Full Cost: 45,107.83$ $ 45,107.83 4.6% Each additional $1,000 or fraction thereof $ 1.82 Yes Full Cost: 1.91$ $ 1.91 4.6% Fee for Work Commencing Before $ Equal to Permit Fee No Charged By: Date: 4/19/2022 Objective: Penalty $ Equal to Permit Fee Permit Issuance Building Division
R. No.: 22-9081 Prop 26 Exception: 5
Collected By: R. Date: 4/19/2022
Building Division
Full Cost:

Reference: CMD 109 4 - 19 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEV / HOUSING & COMMUNITY SVCS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

Neighborhood Conservation $ 935.00 No Charged By: Date: 4/19/2022 Objective: User Fee Non-Interest bearing fee, $ 978.00 4.6% Improvement Program (NCIP) HCSD due at loan payoff for all new Loan Application Fee R. No.: 22-9081 Prop 26 Exception: 2 loans as of 7/1/2018.

Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 978.10$
$ 1,683.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 1,760.00 4.6% HCSD
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 1,760.59$
$ No Charged By: Date: Objective: User Fee Not a new fee. $ 1,564.00 HCSD Fee inadvertently excluded
R. No.: Prop 26 Exception: 2 from prior fee schedule.

Collected By: R. Date:

HCSD
Full Cost: 1,564.97$
$ 3,927.00 No Charged By: Date: 4/19/2022 Objective: User Fee Deposit to cover $ 4,108.00 4.6% HCSD estimated internal costs.

R. No.: 22-9081 Prop 26 Exception: 2 Will bill actual excess costs Collected By: R. Date: 4/19/2022 over deposit.

HCSD Borrower will be responsible
Full Cost: 4,108.03$ for all outside legal &
consulting fees, i.e., HTSV.

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Residential Loan Refinance /
Subordinations all programs
Multi-Family (MF) Loan
Subordination Request Review
Fee
Multi-Family (MF) Loan Refinance
/ Subordination Fee
Reference: CMD 109 4 - 20 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEV / HOUSING & COMMUNITY SVCS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 ChangeFULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
$ 1,215.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 1,271.00 4.6% HCSD
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 1,271.53$
$ 1,215.00 No Charged By: Date: 4/19/2022 Objective: User Fee For new loans $ 1,271.00 4.6% HCSD effective 7/1/2018.

R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 1,271.53$
$ 935.00 No Charged By: Date: 4/19/2022 Objective: User Fee For new loans $ 978.00 4.6% HCSD effective 7/1/2018.

R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 978.10$
$ No Charged By: Date: Objective: User Fee $ 782.00 new HCSD
R. No.: Prop 26 Exception: 2
Collected By: R. Date:

HCSD
Full Cost: 782.48$
Loan Demand Payoff Fee - NCIP
through Title closings
Loan Demand Payoff Fee - FTHB
&
BMP through Title closings
Loan Demand Payoff Fee All
Programs for walk-ins
Loan Demand Payoff Processing
Fee - Multi-Family
Reference: CMD 109 4 - 21 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEV / HOUSING & COMMUNITY SVCS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 ChangeFULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Multi-Family Monitoring Fee $ 122.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 127.00 4.1% Per Unit HCSD Per Unit
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 195.62$
AHA Affordable Housing
Agreements - $ 4,020.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 4,205.00 4.6% For Sale Per Agreement HCSD Per Agreement
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 4,205.85$
Affordable Housing Application
Fee $ 50.00 No Charged By: Date: 5/8/2018 Objective: User Fee Affordable Housing Application $ 500.00 900.0% Per Application HCSD Processing Fee: $500.00 Per Application BMP Affordable Housing R. No.: 18-8518 Prop 26 Exception: 2 Application Processing Fee Collected By: R. Date: 5/8/2018 This is a pass through fee is a credit from HouseKeys HCSD with our 3rd party BMP
on invoices per closing of Full Cost: 500.00$ Administrator. purchase.

AHA Affordable Housing
Agreement - $ 5,610.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 5,868.00 4.6% MF For Rental Per Agreement HCSD Per Agreement
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 5,868.62$
Reference: CMD 109 4 - 22 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEV / HOUSING & COMMUNITY SVCS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 ChangeFULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
AHA Affordable Housing
Agreement - $ 2,057.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 2,151.00 4.6% Amendments Per Agreement HCSD Per Agreement
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 2,151.83$
$ No Charged By: Date: Objective: User Fee This amount shall be $ 978.00 new HCSD deducted from the total
R. No.: Prop 26 Exception: 2 fees that will be charged
Collected By: R. Date: at transaction closing
HCSD (i.e., refinancing,
Full Cost: 978.10$ recapitalization, etc.)
$ No Charged By: Date: Objective: User Fee $ 7,824.00 new HCSD
R. No.: Prop 26 Exception: 2
Collected By: R. Date:

HCSD
Full Cost: 7,824.83$
$ No Charged By: Date: Objective: User Fee $ 58,686.00 new HCSD
R. No.: Prop 26 Exception: 2
Collected By: R. Date:

HCSD
Full Cost: 58,686.21$
Multi-Family Transaction
Application Review Fee
Multi-Family Loan Conversion
Fee
Multi-Family Loan Origination Fee
Reference: CMD 109 4 - 23 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEV / HOUSING & COMMUNITY SVCS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 ChangeFULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
$ No Charged By: Date: Objective: User Fee $ 46,948.00 new HCSD
R. No.: Prop 26 Exception: 2
Collected By: R. Date:

HCSD
Full Cost: 46,948.97$
$ No Charged By: Date: Objective: User Fee $ 15,649.00 new HCSD
R. No.: Prop 26 Exception: 2
Collected By: R. Date:

HCSD
Full Cost: 15,649.66$
$ No Charged By: Date: Objective: User Fee $ 11,737.00 new HCSD
R. No.: Prop 26 Exception: 2
Collected By: R. Date:

HCSD
Full Cost: 11,737.24$
$ No Charged By: Date: Objective: User Fee $ 23,474.00 new HCSD
R. No.: Prop 26 Exception: 2
Collected By: R. Date:

HCSD
Full Cost: 23,474.48$
Multi-Family Project Restructuring
Fee - Transfer of Ownership
(Related Parties)
Multi-Family Project Refinance
Fee
Multi-Family Loan
Recapitalization Fee
Multi-Family Project Restructuring
Fee - Transfer of Ownership (New
Parties)
Reference: CMD 109 4 - 24 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEV / HOUSING & COMMUNITY SVCS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 ChangeFULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Loan Demand Payoff Fee $ 93.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 97.00 4.3% Recalculation HCSD
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
HCSD
Full Cost: 97.81$
Development Impact Fees
Affordable Housing Fees No Charged By: Date: 4/28/2020 Objective:

For Sale Residential HCSD
Single Family Home R. No.: 17-8482 Prop 26 Exception: 6 Townhome Collected By: R. Date: 4/28/2020
Condominium HCSD Full Cost: -$
Development Impact Fees Per Square foot Per Square foot Affordable Housing Fees $ No Charged By: Date: 4/19/2022 Objective: $ Rental Residential HCSD
Any Tenure type 25.88 R. No.: 22-9081 Prop 26 Exception: 6 28.79 11.3% Collected By: R. Date: 4/19/2022
HCSD Full Cost: -$
Fees shall be equal to the
difference between the
unrestricted appraised
market value ("Initial
Market Value") of the unit
and the Affordable Sales
Price of the unit,
multiplied by the fractional
amount due. The Initial
Market Value of the last
unit sold shall be the
basis for calculating the in-lieu
fee.

Impact
Development
Fee
Impact
Development
Fee Inflate annually by Feb - Feb
change in regional BCI
SCMC 17.40.060
As per the City’s
Affordable Housing
Ordinance, residential
ownership projects of ten
(10) or more units must
provide at least fifteen
percent (15%) of the units
at affordable housing
costs.

The City Council may
authorize a developer to
utilize an alternate means
of compliance such as a
dedication of land for
affordable housing, the
development of
affordable units at an off-
site
location, or some
combination thereof.

Such an alternative shall
be memorialized through
a Development
Agreement.

Reference: CMD 109 4 - 25 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEV / HOUSING & COMMUNITY SVCS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 ChangeFULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Development Impact Fees Per Square foot Per Square foot Affordable Housing Fees $ No Charged By: Date: 4/19/2022 Objective: $ Non-Residential Projects HCSD
Retail < 5,000 sf No Fee R. No.: 22-9081 Prop 26 Exception: 6 No Fee Retail ≥ 5,000 sf 6.47 Collected By: R. Date: 4/19/2022 7.20 11.3% Hotel 6.47 HCSD 7.20 11.3% Office¹ < 20,000 sf 12.94 14.39 11.3% Office¹ ≥20,000 sf 25.88 28.79 11.3% Other Commercial 6.47 7.20 11.3% Light Industrial < 20,000 sf 6.47 7.20 11.3% Light Industrial ≥20,000 sf 12.94 14.39 11.3% Low-Intensity Uses² 2.59 2.88 11.3% Full Cost: -$
Inflate annually by Feb - Feb
change in regional BCI
SCMC 17.40.060

2. Low-Intensity Uses such as
Data Centers and
Warehouses
Impact
Development
Fee

1. Office including Industrial
Office, R&D and Commercial
Office
Reference: CMD 109 4 - 26 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change

Objective: Recover Cost
Rezoning Charged By: Date: 4/19/2022 Prop 26 Exception: 3 Rezone single lot to R1 $ 8,754.90 Yes Community Full Cost: $ 11,800.01 $ 9,158.00 4.6% per application Development R. No.: 22-9081 per application R. Date: 4/19/2022
Non Planned Development (PD) $ 19,876.50 Yes Collected By: Full Cost: $ 22,125.02 Developer Specific $ 20,792.00 4.6% Finance
Planned Development (PD) $ 56,400.00 Yes Full Cost: $ 59,000.04 Developer Specific $ 59,000.00 4.6% $ 67,680.00 Yes Full Cost: $ 70,800.05 Developer Specific $ 70,800.00 4.6% $ 36,660.00 Yes Full Cost: $ 38,350.03 Developer Specific $ 38,350.00 4.6% Objective: Recover Cost
Zoning Clearance Yes Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 Zoning Clearance for Home Occupancy $ 282.00 Community Full Cost: $ 295.00 $ 295.00 4.6% Development R. No.: 22-9081
Zoning Clearance for Live $ 282.00 R. Date: 4/19/2022 Full Cost: $ 295.00 $ 295.00 4.6% Entertainment and Outdoor Dining Collected By:
(up to 24 seats) Finance
Zoning Clearance - Other $ 1,128.00 Full Cost: $ 1,180.00 $ 1,180.00 4.6% Non-Single Family
Zoning Code Text Amendment $ 25,380.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Developer Specific $ 26,550.00 4.6% per application Community per application
Development R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 26,550.02
and

PROPOSED NEW

OR REVISED FEE
Development Area Plan Related to a PD-MC
Rezoning
Planned Development Master Community (PD-
MC)

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Reference: CMD 109 4 - 27 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Variance - Single Family $ 3,346.35 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Below cost recovery to $ 3,500.00 4.6% per application Community encourage single-family per application Development R. No.: 22-9081 Prop 26 Exception: 1,2,3 planning R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 17,700.01
Variance - All Others $ 9,946.65 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 10,405.00 4.6% per application Community per application
Development R. No.: 22-9081 Prop 26 Exception: 1,2,3
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 17,700.01
Objective: Recover Cost
Minor Modifications Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 Single Family $ 564.00 Yes Community Full Cost: $ 590.00 $ 590.00 4.6% Development R. No.: 22-9081
All Others $ 1,410.00 Yes R. Date: 4/19/2022 Full Cost: $ 1,475.00 $ 1,475.00 4.6% Collected By:

Finance
Reference: CMD 109 4 - 28 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Off-Site Parking Permit $ 1,410.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,475.00 4.6% (Citywide) Community
Development R. No.: 22-9081 Prop 26 Exception: 1,2,3
Off-Site Parking Permit $ 1,410.00 Yes R. Date: 4/19/2022 $ 1,475.00 4.6% (Events North of 101) (per permit) Collected By: (per permit) per year for Finance Full Cost: $ 1,475.00 per year for events north events north
of 101 of 101

AND AND
(subject to April CPI
figure to be effective
July 1 ea. year)
Off-Site Parking Facilities $ 6.13 No Charged By: Date: 6/22/2021 Objective: Recover Cost Collected from persons $ 6.44 5.0% (Events North of 101) per space Community obtaining an Off-Site per space per event Development R. No.: 21-8981 Prop 26 Exception: 1,2,3 Parking Permit from per event N of 101 R. Date: 6/22/2021 Zoning Administrator and N of 101 Collected By: Full Cost: $ for each parking space for
Finance sports or entertainment
venues north of
Highway 101.

Objective: Recover Cost
Use Permits Charged By: Date: 4/19/2022 Prop 26 Exception: 3 Use Permit - Standard $ 13,913.55 Yes Community Full Cost: $ 23,600.02 $ 14,554.00 4.6% per application Development R. No.: 22-9081 per application R. Date: 4/19/2022
Use Permit - Minor $ 6,011.25 Yes Collected By: Full Cost: $ 11,800.01 $ 6,288.00 4.6% per application Finance per application
Special Permit - Council Approval $ 2,820.00 Yes Full Cost: $ 2,950.00 $ 2,950.00 4.6% per application per application
Special Permit - Non Profit $ 266.70 Yes Full Cost: $ 2,950.00 $ 278.00 4.2% Special Permit - Admin. Approval $ 1,410.00 Yes Full Cost: $ 1,475.00 $ 1,475.00 4.6% Reference: CMD 109 4 - 29 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Objective: Recover Cost
Maps Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3,6 4 or Fewer Lots $ 16,920.00 Yes Community Full Cost: $ 17,700.01 $ 17,700.00 4.6% Development R. No.: 22-9081
5 or More Lots $ 22,560.00 Yes R. Date: 4/19/2022 Full Cost: $ 23,600.02 $ 23,600.00 4.6% Collected By:

Lot line adjustment $ 5,640.00 Yes Finance Full Cost: $ 5,900.00 $ 5,900.00 4.6% per application per application
Objective: Recover Cost
Appeals Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2 From Non-Applicant Resident $ 500.00 Yes Community Full Cost: $ 23,600.02 Below cost recovery to $ 523.00 4.6% per request Development R. No.: 22-9081 encourage single-family per request R. Date: 4/19/2022 planning
All Others $ 10,020.15 Yes Collected By: Full Cost: $ 23,600.02 $ 10,482.00 4.6% Finance
Reposting of Public Charged By: Date: 4/19/2022 Objective: Recover Cost Notification Community
Development R. No.: 22-9081 Prop 26 Exception: 1,2
Single Family $ 124.95 Yes R. Date: 4/19/2022 Full Cost: $ 1,180.00 Below cost recovery to $ 130.00 4.0% per application Collected By: encourage single-family per application Finance planning
Non-Single Family $ 1,128.00 Yes Full Cost: $ 1,180.00 $ 1,180.00 4.6% per application per application
Re-Noticing in Newspaper $ At Cost Yes Full Cost: $ Cost $ At Cost Reference: CMD 109 4 - 30 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Annexation of territory to $ 39,480.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Developer Specific $ 41,300.00 4.6% City of Santa Clara per application Community per application Development R. No.: 22-9081 Prop 26 Exception: 1,2,3,6
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 41,300.03
Objective: Recover Cost
Architectural Review Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 Over the Counter $ 0.00 Yes Community Full Cost: $ 147.50 $ 0.00 Development R. No.: 22-9081
Accessory Dwelling Unit Yes R. Date: 4/19/2022 Full Cost: $ 0.00 $ 295.00 new fee Single Family $ 937.65 Yes Full Cost: $ 11,800.01 Below cost recovery to $ 1,188.00 26.7% Collected By: encourage single-family
New development-Non-SFR $ 33,840.00 Yes Finance Full Cost: $ 35,400.02 planning $ 35,400.00 4.6% SB 9 Review $ 1,692.00 Yes Full Cost: $ 1,770.00 $ 1,770.00 4.6% SB 35 Review $ 22,560.00 Yes Full Cost: $ 23,600.02 $ 23,600.00 4.6% Design Consultant Review $ Deposit of Yes Full Cost: $ - $ Deposit of Consultant Consultant
Estimated Estimated
Costs Plus Costs Plus
Citywide Citywide
Overhead Overhead
Reference: CMD 109 4 - 31 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Objective: Recover Cost
Environmental Review Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3 City review of Draft EIR and $ 33,840.00 Yes Community Full Cost: $ 35,400.02 $ 35,400.00 4.6% preparation of Final EIR per application Development R. No.: 22-9081 per application R. Date: 4/19/2022
City Review of $ 16,920.00 Yes Collected By: Full Cost: $ 17,700.01 $ 17,700.00 4.6% Supplemental EIR/Final EIR Finance
City review or preparation of $ 22,560.00 Yes Full Cost: $ 23,600.02 $ 23,600.00 4.6% Initial Study/MND and Negative per application per application Declaration
Exemption $ 846.00 Yes Full Cost: $ 885.00 $ 885.00 4.6% Exemption (SFR or Paperless) $ 0.00 Yes Full Cost: $ 147.50 $ 0.00 Recordation of Exemption $ 564.00 Yes Full Cost: $ 590.00 $ 590.00 4.6% AB 52 Tribal Consultation $ 846.00 Yes Full Cost: $ 885.00 $ 885.00 4.6% Re-Use of Prior Environmental $ 1,692.00 Yes Full Cost: $ 1,770.00 $ 1,770.00 4.6% Determination
Addendum to Prior Environmental $ 4,512.00 Yes Full Cost: $ 4,720.00 $ 4,720.00 4.6% Determination
Objective: Recover Cost
Prop 26 Exception: 1,2,6
General Plan Amendment - $ 2,845.50 Yes Charged By: Date: 4/19/2022 Full Cost: $ 11,800.01 $ 2,976.00 4.6% Single Family Community
Development R. No.: 22-9081
General plan Amendment - $ 22,560.00 Yes R. Date: 4/19/2022 Full Cost: $ 23,600.02 Developer Specific $ 23,600.00 4.6% Up to one acre per application Collected By: per application Finance
General Plan Amendment - $ 33,840.00 Yes Full Cost: $ 35,400.02 $ 35,400.00 4.6% One to five acres
General Plan Amendment - $ 39,480.00 Yes Full Cost: $ 41,300.03 $ 41,300.00 4.6% Over five acres
Reference: CMD 109 4 - 32 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Development Agreement $ 33,840.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Developer Specific $ 35,400.00 4.6% per application Community Prop 26 Exception: 1,2,6 per application Development R. No.: 22-9081 Full Cost: $ 35,400.02
Amendment or Cancellation $ 11,280.00 Yes R. Date: 4/19/2022 $ 11,800.00 4.6% of Development Agreement per application Collected By: per application Finance Full Cost: $ 11,800.01
Development Agreement $ Actual Cost No $ Actual Cost
Negotiations
Certificate of Compliance $ 2,256.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,360.00 4.6% per certificate Community per certificate
Development R. No.: 22-9081 Prop 26 Exception: 1,2,6
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 2,360.00
Objective: Recover Cost
Signs Charged By: Date: 4/19/2022 Prop 26 Exception: 3.00 Sign Permit Fees $ 332.85 Yes Community Full Cost: $ 590.00 $ 348.00 4.6% (attached or ground) for first sign per application Development R. No.: 22-9081 per application R. Date: 4/19/2022
Temporary Sign Permit/Street $ 81.90 Yes Full Cost: $ 147.50 $ 85.00 3.8% Banner (pursuant to Zoning Ord. per application Collected By: per application Sec. 40-27) good for 60 days; Finance
or ea. additional sign under a
Sign Permit application
Temporary Sign $ 141.00 Yes Full Cost: $ 147.50 Fees to be paid prior to $ 147.00 4.3% Removal Fees per sign retrieval of signs to per sign
any person.

Master Sign Program $ 4,230.00 Yes Full Cost: $ 4,425.00 $ 4,425.00 4.6% Mills Act Application $ 8,078.70 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 8,451.00 4.6% per application Community per application
Development R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 11,800.01
Reference: CMD 109 4 - 33 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Objective: Recover Cost
Pre-Application Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3,6 Pre-Application fee Single Family $ 499.80 Yes Community Full Cost: $ 2,360.00 credited toward cost of $ 522.00 4.4% Development R. No.: 22-9081 full application fee if
Planning Review $ 3,337.95 Yes R. Date: 4/19/2022 Full Cost: $ 4,720.00 submitted within 3 months $ 3,491.00 4.6% Collected By: after completion of
Project Clearance Committee $ 5,640.00 Yes Finance Full Cost: $ 5,900.00 preliminary review. $ 5,900.00 4.6% Flood Zone Verification $ 282.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 295.00 4.6% Community
Development R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 295.00

Zoning Verification $ 486.15 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 508.00 4.5% Community
Development R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 885.00

Objective: Recover Cost
Historical & Landmarks Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2 Single Family $ 937.65 Yes Community Full Cost: $ 11,800.01 Below cost recovery to $ 980.00 4.5% Development R. No.: 22-9081 encourage single-family
R. Date: 4/19/2022 planning
All Others $ 11,280.00 Yes Collected By: Full Cost: $ 11,800.01 $ 11,800.00 4.6%

Stormwater Management Plan $ 846.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 885.00 4.6% Review Community
Development R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 885.00
Reference: CMD 109 4 - 34 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Minor Amendment to Approved $ 846.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 885.00 4.6% Projects Community
Development R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 885.00

ABC Review Verification $ 564.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 590.00 4.6% Community
Development R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 590.00

Tree Removal Date: 4/19/2022 Objective: Recover Cost
Prop 26 Exception: 1,2
Tree Removal Permit 282.00 R. No.: 22-9081 Full Cost: $ 590.00 Below cost recovery to $ 295.00 4.6% Single Family Residence R. Date: 4/19/2022 encourage single-family planning
Tree Removal Permit - All Others 564.00 Full Cost: $ 590.00 $ 590.00 4.6% Heritage Tree Removal $ 795.90 Yes Charged By: Full Cost: $ 2,360.00 Below cost recovery to $ 832.00 4.5% Community encourage single-family
Development planning
$ 500.85 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 523.00 4.4% Community
Development R. No.: 22-9081 Prop 26 Exception: 2,3,6
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 5,900.00

Non-Historical Referral to Historical and
Landmarks Commission - Standard
Reference: CMD 109 4 - 35 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
$ 937.65 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 980.00 4.5% Community
Development R. No.: 22-9081 Prop 26 Exception: 2,3,6
R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 11,800.01

Contract Administration $ Actual Cost No Charged By: Date: 6/22/2021 Objective: Recover Cost $ Actual Cost Community
Development R. No.: 21-8981 Prop 26 Exception: 1,2
R. Date: 6/22/2021
Collected By:

Finance Full Cost: $ Actual Cost

In-House Planning Rate for Services $ 282.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 295.00 4.6% Provided and Not Listed Elsewhere Community
in this Schedule (per hour) Development R. No.: 22-9081 Prop 26 Exception: 1,2 R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 295.00

Time Extensions Charged By: Date: 4/18/2017 Objective: Recover Cost Community
Entitlement Extension $ 50% of No Development R. No.: Prop 26 Exception: 1,2 $ 50% of application fee R. Date: application fee
Collected By: Full Cost: $ 25-50% of
Processing Time Extension $ 25% of No Finance application fee $ 25% of application fee application fee

Non-Historical Referral to Historical and
Landmarks Commission - Comprehensive
Reference: CMD 109 4 - 36 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Code Enforcement Re-Inspection Charged By: Date: 4/19/2022 Objective: Recover Cost Community Prop 26 Exception: 1,2,3
Code Enforcement Re-Inspection Fee $ 265.50 Yes Development R. No.: 22-9081 $ 277.00 4.3% R. Date: 4/19/2022
Collected By:

Finance Full Cost: $ 277.74

Significant Property Alteration Charged By: Date: 4/19/2022 Objective: Recover Cost Community Prop 26 Exception: 1,2,3
Major - Single Family $ 937.65 Yes Development R. No.: 22-9081 Full Cost: $ 11,800.01 $ 980.00 4.5% R. Date: 4/19/2022 Applies to Historic Preservation
Collected By: properties only.

Major - Other $ 11,280.00 Yes Finance Full Cost: $ 11,800.01 Subject to Historical and Land- $ 11,800.00 4.6% mark Commission approval.

Significant Property Alteration Charged By: Date: 4/19/2022 Objective: Recover Cost Community Prop 26 Exception: 1,2,3
Minor - Single Family $ 625.80 Yes Development R. No.: 22-9081 Full Cost: $ 8,850.01 $ 654.00 4.5% R. Date: 4/19/2022 Applies to Historic Preservation
Collected By: properties only.

Minor - Other $ 1,987.65 Yes Finance Full Cost: $ 8,850.01 $ 2,079.00 4.6%

Reference: CMD 109 4 - 37 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

COMMUNITY DEVELOPMENT / PLANNING RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV COMMENTS Change and

PROPOSED NEW

OR REVISED FEE

DATE FEE

NUMBER & DATE

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
PERIOD

OBJECTIVE
FULL COST FACTOR(if applicable)

LAST CHANGED

FEE DETAIL

CURRENT

FEE ORDINANCE
2023-24
(SEE READER'S GUIDE)
PROP 26 EXCEPTION
Specific Plan Fee - Lawrence Charged By: Date: 4/19/2022 Objective: Recover Cost Fees adjusted annually using Station Area Plan (LSAP) Community the December CPI factor from Development R. No.: 22-9081 Prop 26 Exception: 1,2,3 the previous year.

Phase I Developers $ 22,678.28 No R. Date: 4/19/2022 $ 23,785.39 4.9% (per acre) Collected By: Full Cost: $ 1,091,732.97 (per acre) Phase II Developers $ 14,502.80 No Finance $ 15,210.80 4.9% (per acre) Fees collected at the time of (per acre)
Building Permit Application.

Specific Plan Fee - Tasman $ 286.93 No Charged By: Date: 4/19/2022 Objective: Recover Cost Fees adjusted annually using $ 300.94 4.9% East Specific Plan Area (TESP) (per unit) Community the December CPI factor from (per unit) Development R. No.: 22-9081 Prop 26 Exception: 1,2,3 the previous year.

R. Date: 4/19/2022
Collected By: Full Cost: $ 1,270,303.29
Finance
Fees collected prior to
Architectural Committee
Review.

Patrick Henry Drive CFD Formation $ No Charged By: Date: Objective: Recover Cost Community
Application Received Before July 1, 2023 Development R. No.: Prop 26 Exception: 1,2,6 $ 810.81 new fee fee due prior to issuance of Certificate of R. Date: per acre Occupancy Collected By: Full Cost: $ 60,000.00
Finance Full Cost Per Acre $ 810.81
Application Received On/After July 1, 2023 $ 810.81 new fee fee due prior to Development Review per acre
Hearing (DRH)
Reference: CMD 109 4 - 38 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
Electric Utility

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change Overhead Lines - New $ 1,235.61 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,292.57 4.6% Single Family/Residential per lot Electric per lot
R. No.: 22-9081 Prop 26 Exception: 1,2,6
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 1,292.57$
Overhead Lines - New $ 759.88 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 794.91 4.6% Multiple Units per unit Electric per unit
R. No.: 22-9081 Prop 26 Exception: 1,2,6
Collected By: R. Date: 4/19/2022
Full Cost: 794.91$
Overhead Lines - New $ 7.65 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 8.01 4.6% Street Lighting per front foot Electric per front foot
R. No.: 22-9081 Prop 26 Exception: 1,2,6
Collected By: R. Date: 4/19/2022
Full Cost: 8.01$
Underground - New $ 2,436.28 No Charged By: Date: 4/19/2022 Objective: Recover Cost Fee updated via separate study. $ 2,548.59 4.6% Single Family/Residential per lot Electric per lot
R. No.: 22-9081 Prop 26 Exception: 1,2,6 Amount shown is for reference Collected By: R. Date: 4/19/2022 purposes only. See adopting Finance Ordinance for details.

Full Cost: 2,548.59$
Underground - New $ 2,070.84 No Charged By: Date: 4/19/2022 Objective: Recover Cost Fee updated via separate study. $ 2,166.31 4.6% Multiple Units/Residential per unit Electric per unit
R. No.: 22-9081 Prop 26 Exception: 1,2,6 Amount shown is for reference Collected By: R. Date: 4/19/2022 purposes only. See adopting Finance Ordinance for details.

Full Cost: 2,166.31$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Reference: CMD 109 5 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Underground - New $ 18.81 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 19.68 4.6% Street Lighting per front foot Electric per front foot
R. No.: 22-9081 Prop 26 Exception: 1,2,6
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 19.68$
Underground - Existing $ 3,578.71 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,743.69 4.6% Single Family per lot Electric per lot
R. No.: 22-9081 Prop 26 Exception: 1,2,6
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 3,743.69$
Underground - Existing $ 1,912.88 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,001.06 4.6% Multi-Units per unit Electric per unit
R. No.: 22-9081 Prop 26 Exception: 1,2,6
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 2,001.06$
Underground - Existing $ 27.95 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 29.24 4.6% Street Lighting per front foot Electric per front foot
R. No.: 22-9081 Prop 26 Exception: 1,2,6
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 29.24$
Reference: CMD 109 5 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Load Development $ 348.99 No Charged By: Date: 4/19/2022 Objective: Recover Cost 1st Tier Fee: Up to 4,500 KVA $ 516.58 48.0% per kVA Electric per kVA
Up to 4,500 kVA R. No.: 22-9081 Prop 26 Exception: 6 2nd Tier Fee: > 4,500 KVA Up to 4,500 kVA Collected By: R. Date: 4/19/2022
$ 697.98 No Finance Fee updated via separate study. $ 1,033.16 48.0% per kVA per kVA
> 4,500 kVA Amount shown is for reference > 4,500 kVA
purposes only. See adopting
Ordinance for details.

These fees are only to be used
when they are referenced in an
executed substation agreement
and will be phased out. All other
substation agreements will
reference the applicable Load
Development Fee.

Full Cost: See Comments
Load Development Charged By: Date: 4/19/2022 Objective: Recover Cost Facilities < 12kV $ 243.63 No Electric Fee updated via separate study. $ 365.45 50.0% per kVA R. No.: 22-9081 Prop 26 Exception: 6 per kVA
Collected By: R. Date: 4/19/2022 Amount shown is for reference Commercial Facilities 12kV $ 203.58 No Finance purposes only. See adopting $ 305.37 50.0% per kVA Ordinance for details. per kVA
Facilities < 12kV and
Customer Facilities $ 391.85 No Commercial Facilities 12kV $ 559.44 42.8% Dedicated 12kV per kVA anticipated to follow a four year per kVA phase-in pattern
Customer Facilities $ 348.99 No 7/1/2022: 40% $ 516.58 48.0% Dedicated 60kV per kVA Full Cost: See Comments 7/1/2023: 60% per kVA 7/1/2024: 80%
7/1/2025: 100%
Reference: CMD 109 5 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Temporary Connection to Pole $ 696.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 728.00 4.6% Electric
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 728.09$
Temporary Power $ Actual cost No Charged By: Date: Objective: Recover Cost $ Actual labor, Electric materials and
R. No.: Prop 26 Exception: 1,2 equipment costs,
Collected By: R. Date: including overhead
Finance
Full Cost: Actual Cost
Underground Street Light $ Actual cost No Charged By: Date: Objective: Recover Cost $ Actual labor, Relocation Electric materials and
R. No.: Prop 26 Exception: 1,2 equipment costs,
Collected By: R. Date: including overhead
Finance
Full Cost: Actual Cost
Service Wire Relocation $ 2,673.50 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,796.00 4.6% from Mid-Span Electric
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 2,796.75$
Reference: CMD 109 5 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Service Wire Relocation $ 843.75 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 882.00 4.5% from Pole Electric
Collected By: R. No.: 22-9081 Prop 26 Exception: 1,2
Finance R. Date: 4/19/2022
Full Cost: 882.65$
Meter Test Deposit $ 209.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 218.00 4.3% Electric
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv. Full Cost: 218.63$
Service Wire Relocation $ Actual labor, No Charged By: Date: 6/22/2021 Objective: Recover Cost $ Actual labor, Additional Linework materials and Electric materials and Includes: equipment costs, R. No.: 21-8981 Prop 26 Exception: 1,2 equipment costs, Labor Costs including overhead Collected By: R. Date: 6/22/2021 including overhead Material Costs Finance
Equipment Costs Full Cost: As Calculated
Electric System Damage $ Actual labor, No Charged By: Date: 6/22/2021 Objective: Recover Cost $ Actual labor, Includes: materials and Electric materials and
Labor Costs equipment costs, R. No.: 21-8981 Prop 26 Exception: 5 equipment costs, Material Costs including overhead Collected By: R. Date: 6/22/2021 including overhead Equipment Costs Finance
Full Cost: As Calculated
Reference: CMD 109 5 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Service Reconnection Residential $ 174.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 182.00 4.6% Electric
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv. Full Cost: 182.02$
Service Disconnection Residential $ 174.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 182.00 4.6% Electric
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv.

Full Cost: 182.02$
Electric Reconnection Fee - $ 107.82 No Charged By: Date: 6/22/2021 Objective: Recover Cost $ Actual labor, Non-Residential per account Electric Penalty materials and R. No.: 21-8981 Prop 26 Exception: 1,2,5 equipment costs, Collected By: R. Date: 6/22/2021 including overhead
Finance /
Municipal Serv.

Full Cost: As Calculated
Electric Disconnection fee $ 107.82 No Charged By: Date: 6/22/2021 Objective: Recover Cost $ Actual labor, Non-Residential per account Electric Penalty materials and R. No.: 21-8981 Prop 26 Exception: 1,2,5 equipment costs, Collected By: R. Date: 6/22/2021 including overhead
Finance /
Municipal Serv.

Full Cost: As Calculated
Reference: CMD 109 5 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Service Fee Customer- $ 232.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 242.00 4.3% Owned Equipment Problem per hour Electric per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 242.70$
Electric replacement/ $ 232.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 242.00 4.3% reconnection fee due to per account Electric Penalty per account meter tampering/illegal Fee to fix R. No.: 22-9081 Prop 26 Exception: 1,2,5 Fee to fix access meter plus Collected By: R. Date: 4/19/2022 meter plus two (2) times Finance / Electric Rules and two (2) times estimated cost Municipal Serv. Regulations #7B Full Cost: 242.70$ estimated cost of services of services
used used
Service Removal $ Actual cost No Charged By: Date: Objective: Recover Cost $ Actual labor, Electric materials and
R. No.: Prop 26 Exception: 1,2 equipment costs,
Collected By: R. Date: including overhead
Finance
Full Cost: Actual Cost
Engineering Plan Check - Electric $ 362.25 No Charged By: Date: 4/19/2022 Objective: Recover Cost For reviewing $ 378.00 4.3% (per sheet) - Includes 3 checks per sheet Electric Encroachment Permit plans per sheet R. No.: 22-9081 Prop 26 Exception: 2,3 that have no electric Collected By: R. Date: 4/19/2022 services request.

Finance For conflicts with existing
Full Cost: 378.95$ electric infrastructure.

Reference: CMD 109 5 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Engineering Plan Check - Electric $ 51.75 No Charged By: Date: 4/19/2022 Objective: Recover Cost For reviewing $ 54.00 4.3% (per sheet) - 4th and subsequent per sheet Electric Encroachment Permit plans per sheet review R. No.: 22-9081 Prop 26 Exception: 2,3 that have no electric Collected By: R. Date: 4/19/2022 services request.

Finance For conflicts with existing
Full Cost: 54.14$ electric infrastructure.

Project Clearance Committee/ $ 801.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 837.00 4.5% Sub Committee review Electric
R. No.: 22-9081 Prop 26 Exception: 2,3
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 837.93$
Time of Use Meter Installation - $ 399.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 417.00 4.5% Residential per meter Electric per meter
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv. Full Cost: 417.39$
Time of Use Meter Installation - $ 589.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 616.00 4.6% Non-Residential per meter Electric per meter
R. No.: 22-9081 Prop 26 Exception: 2,3
Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv.

Full Cost: 616.15$
Reference: CMD 109 5 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Field Marking-Fiber $ 132.75 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 138.00 4.0% Up to 50 ft of excavation Electric
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 138.87$
Field Marking-Fiber $ 88.50 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 92.00 4.0% Over 50 ft. of excavation per each Electric per each
additional R. No.: 22-9081 Prop 26 Exception: 2 additional 50 ft of Collected By: R. Date: 4/19/2022 50 ft of
excavation Finance excavation
Full Cost: 92.58$
Electric equipment relocation $ Actual labor, No Charged By: Date: Objective: Recover Cost $ Actual labor, materials and Electric Per Electric Rules and materials and equipment costs, R. No.: Prop 26 Exception: 2 Regulations Section 6.C equipment costs, including overhead Collected By: R. Date: including overhead Finance
Full Cost: Actual Cost
EV charging retrofit - Existing $ Actual labor, No Charged By: Date: 4/19/2022 Objective: Recover Cost $ Actual labor, Building materials and Electric materials and
equipment costs, R. No.: 22-9081 Prop 26 Exception: 2 equipment costs, including overhead Collected By: R. Date: 4/19/2022 including overhead Finance
Full Cost: Actual Cost
Reference: CMD 109 5 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
SVP system impact study - $ 75,000 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 78,450 4.6% Transmission system Electric
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
CAISO System Impact Study $ 124,200 Finance Total cost with CAISO $ 129,920 4.6% Full Cost: See Comments. Interconnection Study if required.

SVP system impact study - $ 15,000 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 15,690 4.6% Distribution 12kV system Electric
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 15,690$
SVP generation interconnection $ 15,000 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 15,690 4.6% study Electric
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 15,690$
Reference: CMD 109 5 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Distribution Pole Contact-
Application fee $ 235.90 No Charged By: Date: 4/19/2022 Objective: Recover Cost Resolution # 16-8285

2.5% annual escalation per $ 241.80 2.5%
per pole in Electric Under CA Public Utilities Code Resolution per pole in application R. No.: 22-9081 Sections 9510-9520 application R. Date: 4/19/2022 Prop 26 Exception: 2 "Full Cost" represents the amount allowable under PU Code Sections
Collected By: 9510-9520 which were created

2.5% annual escalation Finance Full Cost: See Comments AB1027 Distribution Pole Contact-cable $ 17.61 No Charged By: Date: 4/19/2022 Objective: Recover Cost Resolution # 16-8285

2.5% annual escalation per $ 18.05 2.5%
attachment per each Electric Under CA Public Utilities Code Resolution per each attachment R. No.: 22-9081 Sections 9510-9520 attachment R. Date: 4/19/2022 Prop 26 Exception: 2 "Full Cost" represents the amount allowable under PU Code Sections

2.5% annual escalation Collected By: 9510-9520 which were created 2.5% annual escalation Finance Full Cost: See Comments AB1027
Distribution Pole Contact-equipment
attachment $ 49.98 No Charged By: Date: 4/19/2022 Objective: Recover Cost Resolution # 16-8285

2.5% annual escalation per $ 51.23 2.5%
per each Electric Under CA Public Utilities Code Resolution per each attachment R. No.: 22-9081 Sections 9510-9520 attachment R. Date: 4/19/2022 Prop 26 Exception: 2 "Full Cost" represents the amount allowable under PU Code Sections

2.5% annual escalation Collected By: 9510-9520 which were created 2.5% annual escalation Finance Full Cost: See Comments AB1027
Reference: CMD 109 5 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

ELECTRIC UTILITY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Distribution Pole Contact-riser $ 37.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Resolution # 16-8285

2.5% annual escalation per $ 37.93 2.5%
attachment per each Electric Under CA Public Utilities Code Resolution per each attachment R. No.: 22-9081 Sections 9510-9520 attachment R. Date: 4/19/2022 Prop 26 Exception: 2 "Full Cost" represents the amount allowable under PU Code Sections

2.5% annual escalation Collected By: 9510-9520 which were created 2.5% annual escalation Finance Full Cost: See Comments AB1027
Distribution Pole Contact-anchor $ 3.44 No Charged By: Date: 4/19/2022 Objective: Recover Cost Resolution # 16-8285

2.5% annual escalation per $ 3.52 2.5%
attachment per each Electric Under CA Public Utilities Code Resolution per each attachment R. No.: 22-9081 Sections 9510-9520 attachment R. Date: 4/19/2022 Prop 26 Exception: 2 "Full Cost" represents the amount allowable under PU Code Sections

2.5% annual escalation Collected By: 9510-9520 which were created 2.5% annual escalation Finance Full Cost: See Comments AB1027
Distribution Pole Contact-small cell $ 89.54 No Charged By: Date: 4/19/2022 Objective: Recover Cost Resolution # 16-8285

2.5% annual escalation per $ 91.78 2.5%
per each Electric Under CA Public Utilities Code Resolution per each contact R. No.: 22-9081 Sections 9510-9520 contact
R. Date: 4/19/2022 Prop 26 Exception: 2 "Full Cost" represents the amount

2.5% annual escalation Collected By: allowable under PU Code Sections 2.5% annual escalation Finance Full Cost: See Comments 9510-9520 which were created AB1027
Reference: CMD 109 5 - 12 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
Finance

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change Business Tax Certificate Charged By: Date: Measure J Objective: Tax Fixed Place of Business $ No Finance adopted by Tax subject to annual CPI $ 45 per employee in Santa Clara O. No.: electorate, Prop 26 Exception: * N/A adjustments per year Collected By: O. Date: 11/8/2022 Certain exemptions apply as Not to exceed cap Finance / Full Cost: N/A defined in Chapter 3.40 of the of $350,000 Municipal Serv. - Municipal Code
Business Tax
Charged By: Date: Measure J Objective: Tax Tax based on number of Business Tax Certificate $ 45.00 No Finance adopted by employees and number of $ % of Tax Companies conducting per year O. No.: electorate, Prop 26 Exception: * N/A days employees doing 6 - 64 days: 25% business in the City without Collected By: O. Date: 11/8/2022 business in Santa Clara 65 - 129 days: 50% a fixed place of business Finance / Full Cost: N/A Tax subject to annual CPI 130+ days: 100% Municipal Serv. - adjustments
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Commercial Enterprises $ See Schedule No Finance $ See Schedule 100 attached O. No.: 1721 Prop 26 Exception: * N/A 100 attached Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Manufacturing/Industrial $ See Schedule No Finance $ See Schedule Enterprises 300 attached O. No.: 1721 Prop 26 Exception: * N/A 300 attached Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Professional $ See Schedule No Finance $ See Schedule
200 attached O. No.: 1721 Prop 26 Exception: * N/A 200 attached Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
(SEE READER'S GUIDE)and
PERIOD
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.)

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Reference: CMD 109 6 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Business Tax Certificate $ 5.22 No Charged By: Date: Measure J Objective: Tax Surcharge for apartment $ 18.35 Rental units (3+) per unit Finance adopted by rental mediation = $3.35 per per unit - Apartments per year O. No.: electorate, Prop 26 Exception: * N/A unit per year per year $ 3.00 No Collected By: O. Date: 11/8/2022 Rental Unit Tax: $15 per unit $ 15.00 - Hotels/Motels per unit Finance / Full Cost: N/A per year (all ty pes) per unit per year Municipal Serv. - Tax subject to annual CPI per year Business Tax adjustments
Delinquent payment of $ 100% No Charged By: Date: Measure J Objective: Tax $ 25% business certificate fees - of appropriate Finance adopted by of appropriate 30 days after due date business O. No.: electorate, Prop 26 Exception: 5 business license fee Collected By: O. Date: 11/8/2022 license tax Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Change of name, address or $ 12.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 12.00 business type as shown on per each update Finance per each update current certificate R. No.: 22-9081 Prop 26 Exception: 1,2 Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv. - Full Cost: 12.73$
Business Tax
Business Certificate Info. Charged By: Date: 6/11/1996 Objective: User Fee Special Request $ Actual cost No Finance $ Actual cost
(Research Required) of compilation O. No.: Prop 26 Exception: 1,2 of compilation Collected By: O. Date:

Finance / Full Cost: Actual Cost
Municipal Serv. -
Business Tax
Duplicate business certificate $ 12.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 12.00 each Finance each
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv. - Full Cost: 12.73$
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 6 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Business Tax Certificate $ 45.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 45.00 Ambulance Service flat fee Finance flat fee
per business O. No.: 1721 Prop 26 Exception: * N/A per business plus O. Date: 10/27/1998 plus
$ 15.00 No Collected By: Full Cost: N/A $ 15.00
additional fee Finance / additional fee
for each Municipal Serv. - for each
ambulance Business Tax ambulance
Business Tax Certificate $ 150.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 150.00 Carnivals per day Finance per day
O. No.: 1721 Prop 26 Exception: * N/A
Carnival concession, ride, $ 15.00 No Collected By: O. Date: 10/27/1998 $ 15.00 sideshow per each Finance / Full Cost: N/A per each
per day Municipal Serv. - per day
Business Tax
Business Tax Certificate $ 150.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 150.00 Circus per day Finance per day
O. No.: 1721 Prop 26 Exception: * N/A
Circus concession, ride, $ 15.00 No Collected By: O. Date: 10/27/1998 $ 15.00 sideshow per each Finance / Full Cost: N/A per each
per day Municipal Serv. - per day
Business Tax
Business Tax Certificate $ 150.00 No Charged By: Date: 10/13/1998 Objective: Tax $ 150.00 Promotional Show per day Finance per day
O. No.: 1721 Prop 26 Exception: * N/A
Promotional Show concession, $ 15.00 No Collected By: O. Date: 10/27/1998 $ 15.00 ride, sideshow per each Finance / Full Cost: N/A per each per day Municipal Serv. - per day
Business Tax
Business Tax Certificate $ 150.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 150.00 Escort Service per year Finance per year
(funerals, personal escort O. No.: 1721 Prop 26 Exception: * N/A services, etc.) Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 6 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Business Tax Certificate $ 150.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 150.00 Intracity bus service and per year Finance per year
public transportation O. No.: 1721 Prop 26 Exception: * N/A Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 15.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 15.00 Parade route vendor per parade Finance per parade
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 150.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 150.00 Pawnshop per year Finance per year
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 15.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 15.00 Taxicab Company per cab Finance per cab
per year Police O. No.: 1721 Prop 26 Exception: * N/A per year No Collected By: O. Date: 10/27/1998
Taxicab Stand $ 90.00 Finance / Full Cost: N/A $ 90.00
per year Municipal Serv. - per year
Business Tax
Business Tax Certificate $ 23.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 23.00 Business providing regular per vehicle Finance per vehicle service by use of vehicles O. No.: 1721 Prop 26 Exception: * N/A including catering trucks Collected By: O. Date: 10/27/1998 Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 6 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Business Tax Certificate $ 0.75 No Charged By: Date: 7/7/1992 Objective: Tax $ 0.75 Public market operators per booth Finance per booth
per day O. No.: 1721 Prop 26 Exception: * N/A per day Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 79.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 79.00 Vending Operators per year Finance per year
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 60.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 60.00 Automatic coin-operated each per year Finance each per year amusement machines and O. No.: 1721 Prop 26 Exception: * N/A peep shows Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 30.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 30.00 Juke Box each per year Finance each per year
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 8.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 8.00 Billiard and pool tables per table or Finance per table or Ping-pong tables lane per year O. No.: 1721 Prop 26 Exception: * N/A lane per year $ 80.00 No Collected By: O. Date: 10/27/1998 $ 80.00
Bowling or Tenpin lanes flat fee for 11 Finance / Full Cost: N/A flat fee for 11 or more tables Municipal Serv. - or more tables
or lanes per Business Tax or lanes per
year year
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 6 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Business Tax Certificate $ See Schedule No Charged By: Date: 7/7/1992 Objective: Tax $ See Schedule Merry-go-rounds, shooting 200 attached Finance 200 attached galleries, golf ranges, and O. No.: 1721 Prop 26 Exception: * N/A skating rinks Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Theaters $ 23.00 No Finance $ 23.00
1-500 seats or stalls per year O. No.: 1721 Prop 26 Exception: * N/A per year 501-1000 seats or stalls $ 30.00 No Collected By: O. Date: 10/27/1998 $ 30.00 per year Finance / Full Cost: N/A per year
1001 or more seats or stalls $ 45.00 No Municipal Serv. - $ 45.00 per year Business Tax per year
Business Tax Certificate $ See Schedule No Charged By: Date: 7/7/1992 Objective: Tax $ See Schedule Nightclubs, cabarets, etc. 100 attached Finance 100 attached O. No.: 1639 Prop 26 Exception: * N/A
Collected By: O. Date: 7/7/1992
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Class I entertainment license $ 263.00 No Finance $ 263.00 without a valid theater or night first year O. No.: 1721 Prop 26 Exception: * N/A first year club license for same location. Collected By: O. Date: 10/27/1998 $ 210.00 No Finance / Full Cost: N/A $ 210.00
annual renewal Municipal Serv. - annual renewal
Business Tax
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Class II entertainment license $ 90.00 No Finance $ 90.00 first year O. No.: 1721 Prop 26 Exception: * N/A first year Collected By: O. Date: 10/27/1998
$ 75.00 No Finance / Full Cost: N/A $ 75.00 annual renewal Municipal Serv. - annual renewal
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 6 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Class III entertainment license $ 413.00 No Finance $ 413.00 without a valid theater or night first year O. No.: 1721 Prop 26 Exception: * N/A first year club license for same location. Collected By: O. Date: 10/27/1998 $ 360.00 No Finance / Full Cost: N/A $ 360.00
annual renewal Municipal Serv. - annual renewal
Business Tax
Business Tax Certificate $ See Schedule No Charged By: Date: 7/7/1992 Objective: Tax $ See Schedule Massage establishment 200 attached Finance 200 attached O. No.: 1685 Prop 26 Exception: * N/A
Collected By: O. Date: 2/27/1996
Finance / City Code Section: Full Cost: N/A
Municipal Serv. - 5.40.040
Business Tax
Business Tax Certificate $ 45.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 45.00 Contractors - State licensed per year Finance per year
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 150.00 No Charged By: Date: 10/13/1998 Objective: Tax $ 150.00 Detective Agency per year Finance per year
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 225.00 No Charged By: Date: 7/7/1992 Objective: Tax $ 225.00 Itinerant merchant per year, Finance per year,
max 190 days O. No.: 1721 Prop 26 Exception: * N/A max 190 days Peddlers $ 113.00 No Collected By: O. Date: 10/27/1998 $ 113.00 per year Finance / Full Cost: N/A per year
plus $5.00 Municipal Serv. - plus $5.00
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 6 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Secondhand Dealer $ 150.00 No Finance $ 150.00
per year O. No.: 1721 Prop 26 Exception: * N/A per year Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 113.00 No Charged By: Date: 10/13/1998 Objective: Tax $ 113.00 Principal solicitors certificate per year Finance per year O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ See Schedule No Charged By: Date: 7/7/1992 Objective: Tax $ See Schedule Miniature golf course 200 attached Finance 200 attached O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Christmas tree lots $ 150.00 No Finance $ 150.00
Merchants with an plus all other O. No.: 1721 Prop 26 Exception: * N/A plus all other established place of business applicable fees Collected By: O. Date: 10/27/1998 applicable fees in the City of Santa Clara per lot per sale Finance / City Code Section: Full Cost: N/A per lot per sale Municipal Serv. - 5.15.030
Business Tax
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Pumpkin sales lots $ 150.00 No Finance $ 150.00
plus all other O. No.: 1721 Prop 26 Exception: * N/A plus all other applicable fees Collected By: O. Date: 10/27/1998 applicable fees per lot per sale Finance / City Code Section: Full Cost: N/A per lot per sale Municipal Serv. - 5.15.030
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 6 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Seasonal items sales lots $ 150.00 No Finance $ 150.00
plus all other O. No.: 1721 Prop 26 Exception: * N/A plus all other applicable fees Collected By: O. Date: 10/27/1998 applicable fees per lot per sale Finance / City Code Section: Full Cost: N/A per lot per sale Municipal Serv. - 5.15.030
Business Tax
Business Tax Certificate Charged By: Date: 6/9/2009 Objective: Tax Regulated business - see Bingo $ 50.00 No Finance O. No.: 1658 & 1729 Police Dept. Fee Schedule $ 50.00 O. Date: 6/28/1994 & Prop 26 Exception: * N/A for additional applicable fees.

Collected By: 4/6/1999
Finance / City Code Section: Full Cost: N/A
Municipal Serv. - 5.75.180 & 5.75.050 Business tax amount set Business Tax by SCCC 5.75.180
Amplified Music Permit $ 73.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 76.00 4.1% Finance
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance City Code Section:

9.05.060 (c) (2) Full Cost: 76.37$
City Flag $ Actual Cost No Charged By: Date: Objective: Recover Cost City Council Approved Policy $ Actual Cost Finance
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:

Finance Full Cost: Actual Cost
Block Party Request $ No Charge No Charged By: Date: 6/15/2010 Objective: User Fee Fee waived to promote $ No Charge Finance community spirit.

O. No.: Prop 26 Exception: N/A
Collected By: O. Date:

Finance
Full Cost: 73.00$
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) 7/20/1993.

Reference: CMD 109 6 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Utility service deposit - $ Estimated No Charged By: Date: 8/9/1966 Objective: Recover Cost $ Estimated commercial, industrial and three (3) Municipal Serv. three (3) residential month's usage O. No.: Prop 26 Exception: 1,2 month's usage based on Collected By: O. Date: based on
history and/or Finance / Full Cost: As Calculated history and/or projected load Municipal Serv. projected load
Service turn-on fee Charged By: Date: 4/19/2022 Objective: Recover Cost (for each service) Municipal Serv.

R. No.: 22-9081 Prop 26 Exception: 1,2
Electric $ 46.00 No Collected By: R. Date: 4/19/2022 $ 48.00 4.3% Finance /
Water $ 46.00 No Municipal Serv. Full Cost: 48.58$ $ 48.00 4.3% Billing service charge for late $ 14.00 No Charged By: Date: 6/22/2021 Objective: Recover Cost Set base fee equal to cost of $ 14.00 varies payment - residential, or 1.5% Municipal Serv. Penalty service or 1.5% commercial and industrial per account R. No.: 21-8981 1.5% on outstanding balance per account whichever greater Collected By: R. Date: 6/22/2021 Prop 26 Exception: 1,2,5 or $14.00, whichever is whichever greater Finance / greater.

Municipal Serv. Full Cost: 14.99$
Delinquent Service Letter $ 51.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 53.00 3.9% (48 hour notice) per account Municipal Serv. Penalty per account R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2 Finance /
Municipal Serv. Full Cost: 53.70$
Fees for the verification of $ 136.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 142.00 4.4% electric meter address per address Municipal Serv. per address (aka "ring out") plus R. No.: 22-9081 Prop 26 Exception: 1,2 plus Collected By: R. Date: 4/19/2022
$ 5.00 No Finance / * Per meter full cost is $11 $ 5.00 * per meter Municipal Serv. Full Cost: 142.44$ * per meter Reference: CMD 109 6 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change (SEE READER'S GUIDE)and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION

FULL COST FACTOR
Utility Billing Splitting $ 152.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 158.00 3.9% or Combining Accounts per account Municipal Serv. per account R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv. Full Cost: 158.48$
Municipal Services Charged By: Date: 6/12/2001 Objective: Recover Cost Information Municipal Serv.

Special Request $ Actual cost No O. No.: Prop 26 Exception: 1,2 $ Actual cost (Request Research) of compilation O. Date: of compilation Collected By: Full Cost: Actual Cost
Finance /
Municipal Serv.
10-day letter for house meter $ 129.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 134.00 3.9% for up to 10 units Municipal Serv.

R. No.: 22-9081 Prop 26 Exception: 1,2
For each full or partial $ 19.00 No Collected By: R. Date: 4/19/2022 $ 19.00 increment of 10 thereafter Finance /
Municipal Serv. Full Cost: 135.30$
Meter reading more than $ 87.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 91.00 4.6% once per month Municipal Serv.
1st meter per location R. No.: 22-9081 Prop 26 Exception: 1,2 Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv. Full Cost: 91.46$
Delinquent Reconnect Fee $ 76.00 No Charged By: Date: 6/22/2021 Objective: Recover Cost $ 79.00 3.9% per account Municipal Serv. Penalty per account
R. No.: 21-8981
Collected By: R. Date: 6/22/2021 Prop 26 Exception: 1,2 Finance /
Municipal Serv. Full Cost: 80.20$
Reference: CMD 109 6 - 11 Form: FEEFORM Revised: May 2011

This page is intentionally left blank.

Municipal Fee Schedule
Fire

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / TRAINING FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change Training Fee- $ 1,245.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,302.00 4.6% Fire/Training User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: * N/A Fire/Training
Full Cost: 1,302.39$
Training Fee- $ 1,743.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,823.00 4.6% Fire/Training User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: * N/A Fire/Training
Full Cost: 1,823.35$
Training Fee- $ 1,245.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,302.00 4.6% First Aid (4 Hours) Fire/Training User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: * N/A Fire/Training
Full Cost: 1,302.39$
Per 6 Persons
PERIOD
Per 6 PersonsPer 6 PersonsCPR – Adult/Pediatric
Heart Saver (6 Hours)
Per 6 Persons
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.)

OR REVISED FEE
FEE
and

FULL COST FACTOR
Per 6 Persons
(SEE READER'S GUIDE)

PROPOSED NEW

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
CPR – Adult Heart Saver
(4 Hours)

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
Per 6 Persons

COMMENTS

CURRENT
Reference: CMD 109 7 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / TRAINING FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) ChangePERIOD

OR REVISED FEE
FEE
and

FULL COST FACTOR
(SEE READER'S GUIDE)

PROPOSED NEW

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION

COMMENTS

CURRENT
Training Fee- $ 2,808.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,937.00 4.6% Fire/Training User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: * N/A Fire/Training
Full Cost: 2,937.45$
Training Fee- $ 1,404.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,468.00 4.6% Fire/Training User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: * N/A Fire/Training
Full Cost: 1,468.72$
Training Fee- $ 382.50 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 400.00 4.6% Fire/Training User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: * N/A Fire/Training
Full Cost: 400.13$
Training Fee- $ 412.25 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 431.00 4.5% Fire/Training User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: * N/A Fire/Training
Full Cost: 431.25$
Per 6 Persons
Limit 12
Persons
Per 6 Persons
Limit 12 Persons
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Limit 20
Persons
Safety and Evacuation
Lecture (2 Hours)
Per 6 Persons

PALS/ACLS
Re-Recognition (1 Day)
PALS/ACLS Recognition
(2 Days)
Limit 20 Persons
Per 6 Persons
Fire Extinguisher
Training (2 Hours) Does
not include fees for fire
extinguisher use.

Reference: CMD 109 7 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / RENTAL AND RESOURCES FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change Facility Rental Fee: $ 191.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 199.00 4.2% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 4
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 199.81$
Facility Rental Fee: $ 191.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 199.00 4.2% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 4
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 199.81$
Facility Rental Fee: $ 191.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 199.00 4.2% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 4
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 199.81$
Facility Rental Fee: $ 191.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 199.00 4.2% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 4
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 199.81$

CURRENT

PROPOSED NEW

OR REVISED FEE

FULL COST FACTOR
Training Center:

Classroom (Limit 30
persons)
Training Center:

Classroom (Limit 20
persons)

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Headquarters’
Conference Room
Rental
Training Center:

Classroom (Limit 80
persons)
FEE
and
PERIOD 2023-24COMMENTS
Reference: CMD 109 7 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / RENTAL AND RESOURCES FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CURRENT

PROPOSED NEW

OR REVISED FEE

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FEE
and
PERIOD 2023-24COMMENTS
Facility Rental Fee: $ 191.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 199.00 4.2% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 4
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 199.81$
Resource Fees: $ 481.50 No Charged By: Date: 4/19/2022 Objective: User Fee $ 503.00 4.5% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 503.70$
Resource Fees: $ 267.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 279.00 4.5% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 279.31$
Resource Fees: $ 491.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 513.00 4.5% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 513.64$
Stand-by (One Engine
for Permitted Activity)
Fire Watch (Per
Person)
Water Clean-up –
Industrial and
Commercial (1
Engine)
Training Center: Drill
Grounds/Tower
Reference: CMD 109 7 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / RENTAL AND RESOURCES FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CURRENT

PROPOSED NEW

OR REVISED FEE

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FEE
and
PERIOD 2023-24COMMENTS
Resource Fees: $ 642.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 671.00 4.5% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 671.60$
Resource Fees: $ 163.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 170.00 4.3% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 170.51$
Resource Fees: $ 234.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 244.00 4.3% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 244.79$
Resource Fees: $ 491.00 No Charged By: Date: 4/19/2022 Objective: User Fee $ 513.00 4.5% per hour Fire per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Fire/Administration
Full Cost: 513.64$
Water Clean-up –
Industrial and
Commercial (1
Battalion Chief)
Water Clean-up –
Industrial and
Commercial (1 Truck)
Water Clean-up –
Industrial and
Commercial (1 Haz-
Mat)
DUI Fire Response
Reference: CMD 109 7 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change $ 1,576.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,905.00 20.8% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Permit Center Full Cost: 2,234.47$
$ 1,530.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,742.00 13.8% Fire/Prevention User Fee
Special Hazard Systems R. No.: 22-9081
(including Halon, Wet and Dry Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Chemical Systems, CO2, Fire/Prevention
Foam and Similar Systems). Full Cost: 1,955.16$
$ 1,021.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,209.00 18.3% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
$ 1,165.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,281.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
Automatic Fire Extinguishing
Systems:

Automatic Fire Extinguishing
Systems:

FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR
1-49 heads
Hood & Duct per system
Automatic Fire Sprinkler
Systems - New:

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Alternate Materials, Design
and Methods of Construction
and Equipment
Reference: CMD 109 7 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 1,864.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,049.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,234.47$
$ 3,031.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,331.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,631.01$
$ 699.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 768.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 837.93$
$ 788.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 952.00 20.8% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
1-49 heads, no
calculations
Each additional 100
heads (>200 heads)
Automatic Fire Sprinkler
Systems - New:

Automatic Fire Sprinkler
Systems - New:
50-100 heads
Automatic Fire Sprinkler
Systems - New:

Automatic Fire Sprinkler
Systems - Existing:
101-200 heads
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 932.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
$ 1,515.17 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,665.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,815.51$
$ 1,748.17 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,921.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,094.82$
Automatic Fire Sprinkler

$ 2,798.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,074.00 9.9% Systems - Existing: Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,351.70$
Automatic Fire Sprinkler
Systems - Existing:
1-49 heads, with
calculations
101-200 heads, with
calculations
50-100 heads, with
calculations
Automatic Fire Sprinkler
Systems - Existing:

Automatic Fire Sprinkler
Systems - Existing:

Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
50-100 heads, no
calculations
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 348.83 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 383.00 9.8% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 418.96$
$ 1,254.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
Per new Fire Code, this is no
longer a permit type
Building Plans $ 35% of Building Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 35% of Building varies Department Fee Permit Center User Fee Department Fee
$831 Minimum R. No.: 22-9081 $904 Minimum
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Permit Center
Full Cost: 977.58$
Carnivals and Fairs $ 877.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,136.00 29.5% per event Fire/Prevention User Fee per event
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
Each additional 100
heads (>200 heads)
Automatic Fire Sprinkler
Systems - Existing:

Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Battery Systems (Remove Fee
no longer part of CFC)
Reference: CMD 109 7 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 853.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 985.00 15.4% Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
$ 1,053.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,224.00 16.2% Fire User Fee
R. No.: 22-9081
Permit by Rule Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
Compressed Gas Installation $ 1,505.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,730.00 15.0% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,955.16$
Cooking Oil Storage Tanks $ 1,165.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,280.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
Closure of an Onsite
Hazardous Waste Treatment
System:

Closure of an Onsite
Hazardous Waste Treatment
System:

Conditionally Authorized
and Conditionally
Exempt
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Reference: CMD 109 7 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
Demolition of Building $ 877.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,136.00 29.5% Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
$ 3,865.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 4,446.00 15.0% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 5,027.56$
Emergency Alarm Systems: $ 1,864.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,049.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,234.47$
Emergency Alarm Systems: $ 1,068.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,117.00 4.6% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
Emergency Responder Radio
Coverage System
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
New System – No Gas
Detection
Modification – No Gas
Detection
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
Emergency Alarm Systems: $ 2,330.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,561.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,793.09$
Emergency Alarm Systems: $ 1,309.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,369.00 4.6% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
Engineering Referrals $ 644.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 880.00 36.6% (Parcel maps, public roads, Fire User Fee
EVAE's, public fire hydrants) R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
$ 1,718.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,976.00 15.0% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,234.47$
Environmental Impact Report
Initial Review (includes 6 hours
of review)
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
New System - Including
Gas Detection
Modification Including
Gas Detection
Reference: CMD 109 7 - 12 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 279.31$
Exhibit and Trade Shows $ 1,110.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,392.00 25.4% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
$ 932.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
$ 1,398.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,537.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:

Fire Alarm Systems (Non-high
rise and R-2 Occupancies:

Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Environmental Impact Report
each additional hour after initial
review
21-40 Devices
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
1-20 Devices
Reference: CMD 109 7 - 13 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 2,330.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,561.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,793.09$
$ 3,031.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,331.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,631.01$
$ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 558.62$
$ 1,165.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,280.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:

Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):
1-20 Devices
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:

Each additional 50 devices
(>200 devices)
101-200 Devices
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:
41-100 Devices
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 14 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 1,864.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,049.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,234.47$
$ 2,798.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,075.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,351.70$
$ 3,497.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,843.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 4,189.63$
$ 699.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 768.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 837.93$
Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):

Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):
101-200 Devices
Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):

Each additional 50 devices
(>200 devices)
41-100 Devices
Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):
21-40 Devices
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 15 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
Fire Pump Installation $ 2,798.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,074.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,351.70$
$ 1,282.17 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,409.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,536.20$
$ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 558.62$
High-Rise Fire Protection
Water Storage Tank (1st tank)
High-Rise Fire Protection
Water Storage Tank (each
additional tank)
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 16 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 4,300.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Modified fee structure Fire/Prevention User Fee
Facility/Site R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 5,586.17$
Facility/Site - <=5,000 sq ft $ 1,396.54$ $ 1,396.00 -67.5% Facility/Site - 5,001 to 25,000 $ 2,234.47$ $ 2,234.00 -48.1% sq ft
Facility/Site - >25,001 sq ft $ 2,793.09$ $ 2,793.00 -35.1% $ Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,396.00 new Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
$ 2,149.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,471.00 15.0% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,793.09$
Backflow Preventer
Replacement
Hazardous Materials Closure
Plan:

Hazardous Materials Closure
Plan:

Equipment
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 17 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 2,330.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,561.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,793.09$
$ 1,864.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,049.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,234.47$
$ 348.83 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 383.00 9.8% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 418.96$
Liquefied Petroleum Gases $ 932.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.9% Installation Per Tank Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
Hazardous Material
Tool/Equipment Installation
High-Piled Combustible
Storage
Hazardous Material
Tool/Equipment New
Knox Box Installation
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 18 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 3,264.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,587.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,910.32$
$ 699.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 768.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 837.93$
Ovens: $ 932.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
Community Development $ 932.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.9% Department Referrals Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Methane Venting and
Detection Systems
Open Burnings
Industrial Baking and/or
Drying per oven
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 19 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 1,631.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,793.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,955.16$
$ 2,798.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,074.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,351.70$
Refrigeration System $ 1,110.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,392.00 25.4% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
Access Control and $ 688.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 972.00 41.2% Traffic Calming Devices Fire User Fee
Gates and Barricades across R. No.: 22-9081
fire apparatus access roads Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,256.89$
Pyrotechnics Special Effects
Proximal to Audience
Public Fireworks Display and
Pyrotechnic Special Effects
Use
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 20 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
Smoke Control System $ 4,663.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 5,124.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 5,586.17$
Standpipe Systems: $ 1,165.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,280.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
$ 1,934.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,224.00 15.0% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,513.78$
$ 860.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 988.00 14.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Underground and Above
Ground Tank Installations
(each additional tank after the
1st)
Storage Tanks - Hazardous
Materials:

Underground and Above
Ground Tank
Installations (1st tank)
Wet, Combination and
Horizontal
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 21 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 1,934.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,224.00 15.0% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,513.78$
$ 860.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 988.00 14.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
$ 1,075.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,235.00 14.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,396.54$
First Tent, Canopy or Air $ 932.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.8% Supported Structure Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
Underground and Above
Ground Tank Removals (each
additional tank after the 1st)
Underground and Above
Ground Tank Removals
(1st tank)
Underground and Above
Ground Tank Modifications
Storage Tanks - Hazardous
Materials:

Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 22 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
Each Additional Tent, Canopy $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% or Air Supported Structure Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 418.96$
Special Event Structure $ 2,330.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,561.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,793.09$
$ 1,631.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,793.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,955.16$
$ 2,241.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,377.00 6.0% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,513.78$
Underground Fire Service
Systems:

Fire Sprinkler System
with Hydrants
Fire Sprinkler System
(no hydrants)
Underground Fire Service
Systems:

Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 23 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 932.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.9% Fire/Prevention User Fee
Repairs R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,117.23$
$ 1,289.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,482.00 14.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
$ 699.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 768.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 837.93$
$ 1,398.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,537.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
Underground Fire Service
Systems:

Residential 13D - Initial
Submittal Plan Review
Required
Automatic Fire Sprinkler
Systems:

Automatic Fire Protection
System for Spray Booths
Automatic Fire Sprinkler
Systems:

Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Residential 13D - Secondary
Submittal - No Plan Review
Required
Reference: CMD 109 7 - 24 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 1,864.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,049.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,234.47$
$ 1,110.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,392.00 25.4% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
$ 1,288.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,761.00 36.7% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,234.47$
$ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 558.62$
2-Way Elevator Permit
On-Demand Mobile Fueling
Site Permit
Solar Photovoltaic Power
Systems - COMMERCIAL
Solar Photovoltaic Power
Systems - RESIDENTIAL
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 25 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 2,798.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 3,074.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,351.70$
$ 1,110.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,392.00 25.4% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
$ 966.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,320.00 36.6% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
Access Controlled Egress
Fire Safety
Demolition/Construction Plan
Phased Permitting /
Occupancy Plan
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 26 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 1,398.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Modified fee structure (all categories) Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Modification/Addition to $ Fire/Prevention
Existing Tool/Equipment Full Cost: 1,675.85$
Modification - Existing Tool - $ 1,675.85$ $ 1,537.00 9.9% Changing hazmat and
detection - no construction 1,117.23$ $ 1,117.00 -20.1% Demolition Only $ 1,117.23$ $ 1,117.00 -20.1% $ 1,398.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,536.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,675.85$
$ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 558.62$
Energy Storage Systems
Hazardous Materials
Tool/Equipment Modification
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Energy Storage Systems -
RESIDENTIAL (R3)
Reference: CMD 109 7 - 27 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
$ 1,864.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,049.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,234.47$
$ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Fire/Prevention User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 558.62$
Firefighter Air $ 1,961.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,656.00 35.4% Replenishment System Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire Prevention
Full Cost: 3,351.70$
Carbon Dioxide Beverage $ 1,047.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,221.00 16.6% Dispensing System Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire Prevention
Full Cost: 1,396.54$
Plant Extraction Systems
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Plan Revision/Resubmittal Fee
Reference: CMD 109 7 - 28 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
Design $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Review/Consultation per hour Fire User Fee per hour
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire Prevention
Full Cost: 279.31$
Miscellaneous Inspections $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% or Plan Reviews, per hour per hour Fire User Fee per hour R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire Prevention
Full Cost: 279.31$
Overtime Inspection $ 937.07 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 971.00 3.6% (min max 3 hrs) (min max 3 hrs) Fire User Fee (min max 3 hrs) R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire Prevention
Full Cost: 1,005.51$
Overtime Plan Review $ 937.07 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 971.00 3.6% (min max 3 hrs) (min max 3 hrs) Fire User Fee (min max 3 hrs) R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire Prevention
Full Cost: 1,005.51$
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Reference: CMD 109 7 - 29 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CONSTRUCTION PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24
FEE
and
PERIOD
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE

COMMENTS
Outdoor Assembly Event $ 1,021.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,208.00 18.3% Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire Prevention
Full Cost: 1,396.54$
$ 466.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% per inspection Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Fire Prevention
Full Cost: 558.62$
Licensed Care Facility
(Pre-Inspection)
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 30 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change Operational Permit: $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Operational Permit: $ 267.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 279.00 4.5% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Operational Permit: $ 905.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,011.00 11.7% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,117.23$
Operational Permit: $ 25.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 50.00 100.0% Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 69.83$
2023-24
FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Amusement Park Buildings
Covered and Open Mall
Buildings
Aerosol products

CURRENT

FULL COST FACTOR COMMENTS
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Target less than full cost
recovery
New fee linked to Fire Code
Additive Manufacturing
Emergency Information
Public Safety Emergency
Information - Business
License
Reference: CMD 109 7 - 31 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Operational Permit: $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Operational Permit: $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Explosives
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Cutting and Welding
Cellulose Nitrate Storage
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Exhibit and Trade Shows
Reference: CMD 109 7 - 32 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ 583.17 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 640.00 9.7% Combustible Storage - Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 698.27$
Operational Permit: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Dry Cleaning Plants Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Including tires in excess
of 2,500 cubic feet
Combustible Dust
Producing Operations
Combustible Fiber Storage
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 33 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 261.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 270.00 3.2% Energy Storage Systems Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Hot Work Operations Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ 267.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 279.00 4.5% Lithium-Ion and Lithium Annual Fire User Fee Annual
Metal Battery Storage R. No.: 22-9081
(Collection and Storage Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 over 1,000 pounds) Finance
Full Cost: 279.31$
High-Piled Combustible
Storage
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
New fee linked to Fire Code
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 34 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Lumber Yard - Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Magnesium Working - Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Miscellaneous combustible Annual Fire User Fee Annual
storage R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Operational Permit: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Organic Coatings Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
More than 100,000
board feet
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
More than 10 lbs. per
work day
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 35 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 115.83 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 127.00 9.6% Industrial Ovens Annual Fire User Fee Annual
(Industrial baking or Drying) R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 139.65$
Operational Permit: $ 174.08 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 191.00 9.7% Places of Assembly Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 209.48$
Operational Permit: $ 1,398.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,536.00 9.9% Places of Assembly Annual Fire User Fee Annual
(Temporary) R. No.: 22-9081
TEMPORARY SPECIAL EVENT Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,675.85$
Operational Permit: $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Compressed Gases Annual Fire User Fee Annual
Cryogenic R. No.: 22-9081
compressed Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Operational Permit: $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Pyroxylin Plastics Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 36 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Refrigeration Equipment Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Repair Garages Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Rooftop Heliports Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Operational Permit: $ 697.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 767.00 10.0% Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 837.93$
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Smoke Control and
Evacuation Systems
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 37 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Operational Permit: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Tire Rebuilding Plants Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Operational Permit: $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Operational Permit: $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Wood Products – Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Storage in excess of 200
cubic feet
Waste Handling Facilities
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Spraying or Dipping
Operations
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 38 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 115.83 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 127.00 9.6% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 139.65$
Operational Permit: $ 115.83 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 127.00 9.6% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 139.65$
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Pyrotechnics Special
Effects Material Storage
Motor Fuel Dispensing
Facilities
Mobile Food Preparation
Vehicles
Liquid-or-gas Vehicles or
Equipment in Assembly
Buildings
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 39 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Operational Permit: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Operational Permit: $ 322.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 440.00 36.6% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
$ 277.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 348.00 25.4% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Single Story Building Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
1 to 20,000 square feet
Plant Extraction Systems
Emergency Responder
Radio Coverage System
Indoor Growing
Operations
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 40 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
$ 416.25 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 522.00 25.4% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 628.44$
Multi-Story Buildings $ 483.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 660.00 36.6% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 837.93$
Operational Permit: $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% per hour Fire User Fee per hour
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ Yes Charged By: Date: Objective: Recover Cost $ 140.00 new Energy Storage Systems Fire User Fee
Serving Life Safety Systems R. No.:

Collected By: R. Date: Prop 26 Exception: 1,2,3
Finance
Full Cost: 140.18$
2 or more stories in height
and not classified as a
High Rise.

Single Story Buildings Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
20,001 square feet or greater
Operational Permit
Reinspection Fee
(per hour)
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 41 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ Yes Charged By: Date: Objective: Recover Cost $ 558.00 new Mobile Fueling of Fire User Fee Annual
Hydrogen-Fueled Vehicles R. No.:

Collected By: R. Date: Prop 26 Exception: 1,2,3
Finance
Full Cost: 558.62$
Operational Permit: $ Yes Charged By: Date: Objective: Recover Cost $ 558.00 new Hazardous Production Fire User Fee Annual
Materials Facilities R. No.:

Collected By: R. Date: Prop 26 Exception: 1,2,3
Finance
Full Cost: 558.62$
Operational Permit: $ 481.70 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 279.00 -42.1% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
Operational Permit: $ Yes Charged By: Date: Objective: Recover Cost $ 279.00 new Fire User Fee Annual
R. No.:

Collected By: R. Date: Prop 26 Exception: 1,2,3
Finance
Full Cost: 279.31$
New fee linked to Fire Code
Private Fire Hydrants
Fire Hydrants and
Valves
Reference: CMD 109 7 - 42 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change2023-24 FEE
and
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

FULL COST FACTOR COMMENTS
Operational Permit: $ Yes Charged By: Date: Objective: Recover Cost Linked to Fire Code $ 558.00 new Temporary Membrane Fire User Fee Annual
Structures and Tents R. No.:

Collected By: R. Date: Prop 26 Exception: 1,2,3
Finance
Full Cost: 558.62$
Operational Permit: $ Yes Charged By: Date: Objective: Recover Cost New fee linked to Fire Code $ 558.00 new Lithium Batteries Fire User Fee Annual
R. No.:

Collected By: R. Date: Prop 26 Exception: 1,2,3
Finance
Full Cost: 558.62$
Operational Permit: $ Yes Charged By: Date: Objective: Recover Cost New fee linked to Fire Code $ 558.00 new Additional Permits Fire User Fee Annual
R. No.:

Collected By: R. Date: Prop 26 Exception: 1,2,3
Finance
Full Cost: 558.62$
Reference: CMD 109 7 - 43 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS - HAZ-MAT RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change Combustible and Flammable
d
$ 233.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.6% Combustible Liquids Materials Annual Fire User Fee Annual (any amount) R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
$ 1,398.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,675.00 19.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,675.85$
$ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$

FEE PROPOSED NEW

OR REVISED FEE
Compressed Gases (any
amount)

FEE DETAIL
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
Combustible and Flammable
Materials - On Demand Mobile
Fueling

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

OBJECTIVE
2023-24
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3

COMMENTS
and
PERIOD
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 44 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS - HAZ-MAT RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

FEE PROPOSED NEW

OR REVISED FEE

FEE DETAIL
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

OBJECTIVE
2023-24COMMENTS
and
PERIOD
Corrosives $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Cryogens $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Cryogenic Fluids Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Highly Toxic Materials $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Liquefied Petroleum Gas $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% (any amount) Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 363.10$
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 45 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS - HAZ-MAT RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

FEE PROPOSED NEW

OR REVISED FEE

FEE DETAIL
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

OBJECTIVE
2023-24COMMENTS
and
PERIOD
Organic Peroxides: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Oxidizing Materials: $ 302.37 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 332.00 9.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Except: Class 1 Oxidizers Full Cost: 363.10$
Pyrophoric Materials: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Liquids and Solids - any
amount
Except: Class V Organic
Peroxides
Gases, Liquids and Solids -
any amount
Gases - more than 504 cubic
feet
Liquids and Solids - any
amount
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 46 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / OPERATIONAL PERMITS - HAZ-MAT RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

FEE PROPOSED NEW

OR REVISED FEE

FEE DETAIL
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

OBJECTIVE
2023-24COMMENTS
and
PERIOD
Toxic Materials: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Unstable (Reactive) Materials: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Water Reactive Materials: $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Gases, Liquids and Solids -
any amount
Except: Class 1 Water
Reactive Materials
Gases, Liquids and Solids -
any amount
Gases, Liquids and Solids -
any amount
Except: Class 1 Unstable
Reactive Materials
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 47 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / STATE MANDATED RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change High-Rise $ 932.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.8% per floor Fire User Fee per floor
Annual R. No.: 22-9081 Annual
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,117.23$
R-1/R-2 Occupancies: $ 27.35 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 30.00 9.7% per unit Fire User Fee per unit
Annual R. No.: 22-9081 Annual
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 33.52$
High-Rise R-1/R-2 $ 932.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.8% per floor Fire User Fee per floor
Annual R. No.: 22-9081 Annual
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,117.23$
Commercial Day Care (E3) $ 233.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 256.00 9.9% Adult Day Care (I4) Annual Fire User Fee Annual
7-49 persons R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$

PROPOSED NEW

OR REVISED FEE

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
PERIOD

CURRENT
and
per floor
(per floor)
Multi-Family, 3 or more
residential units
2023-24
FEE

COMMENTS
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 48 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / STATE MANDATED RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

PROPOSED NEW

OR REVISED FEE

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
PERIOD

CURRENT
and
2023-24
FEE

COMMENTS
Commercial Day Care (E3) $ 349.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 384.00 9.9% Adult Day Care (I4) Annual Fire User Fee Annual
50-149 persons R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 418.96$
Commercial Day Care (E3) $ 699.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 768.00 9.9% Adult Day Care (I4) Annual Fire User Fee Annual
150+ persons R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 837.93$
School $ 466.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 512.00 9.9% 1-250 students Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
School $ 932.67 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,024.00 9.8% 251-500 students Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,117.23$
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 49 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / STATE MANDATED RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

PROPOSED NEW

OR REVISED FEE

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
PERIOD

CURRENT
and
2023-24
FEE

COMMENTS
School $ 1,865.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,049.00 9.8% > 500 students Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 2,234.47$
Jails $ 555.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 696.00 25.4% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 837.93$
Hospitals $ 2,263.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,528.00 11.7% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 2,793.09$
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in full cost recovery
over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Reference: CMD 109 7 - 50 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / PENALTY FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change False Alarm Responses: $ 354.89 No Charged By: Date: 4/19/2022 Objective: Penalty $ 402.00 13.3% Fire
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Fire Prevention
Full Cost: 450.52$
Re-Inspection Fee: $ 388.17 No Charged By: Date: 4/19/2022 Objective: Penalty $ 403.00 3.8% Fire
R. No.: 22-9081 Prop 26 Exception: 1,2,3
Collected By: R. Date: 4/19/2022
Fire Prevention
Full Cost: 418.96$
$ 229.00 No Charged By: Date: 4/19/2022 Objective: Penalty $ 393.00 71.6% Fire
R. No.: 22-9081 Prop 26 Exception: 1,2,3
Collected By: R. Date: 4/19/2022
Fire Prevention
Full Cost: 558.62$
$ 229.00 No Charged By: Date: 4/19/2022 Objective: Penalty $ 393.00 71.6% Fire
R. No.: 22-9081 Prop 26 Exception: 1,2,3
Collected By: R. Date: 4/19/2022
Fire Prevention
Full Cost: 558.62$

PROPOSED NEW

OR REVISED FEE
2023-24
After third time in 180
day period per response
For failure to cancel
appointment, work not
ready for inspection or
more than two re-
inspections
Expired Construction Permit
Plan Review Reactivation Fee
Expired Construction Permit
Reactivation Fee

COMMENTS
Phasing in over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Phasing in over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3Phasing in over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3
Phasing in over 3 year period
FY 22/23: 1/3
FY 23/24: 1/3
FY 24/25: 1/3

CURRENT
FEE
and
PERIOD
Reference: CMD 109 7 - 51 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / PENALTY FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

PROPOSED NEW

OR REVISED FEE
2023-24COMMENTS

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
$ No Charged By: Date: Objective: Penalty 25% of Assessed Fees new Fire
R. No.: Prop 26 Exception: 5
Collected By: R. Date:

Fire Prevention
Full Cost:
$ No Charged By: Date: Objective: Penalty 50% of Assessed Fees new Fire
R. No.: Prop 26 Exception: 5
Collected By: R. Date:

Fire Prevention
Full Cost:
$ No Charged By: Date: Objective: Penalty 100% of Assessed Fees new Fire
R. No.: Prop 26 Exception: 5
Collected By: R. Date:

Fire Prevention
Full Cost:

Late Payment of CUPA
Operational Permit Fee - 31-60
days late
Late Payment of CUPA
Operational Permit Fee - 61-90
days late
Late Payment of CUPA
Operational Permit Fee - Over
90 days late
Reference: CMD 109 7 - 52 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / PENALTY FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

PROPOSED NEW

OR REVISED FEE
2023-24COMMENTS

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
$ No Charged By: Date: Objective: Penalty $ Penalty as Assessed per new Fire CSC Municipal Code
R. No.: Prop 26 Exception: 5
Collected By: R. Date:

Fire Prevention
Full Cost:
$ No Charged By: Date: Objective: Penalty $ 100.00 new Fire per occurance
- Per Occurance R. No.: Prop 26 Exception: 5
Collected By: R. Date:

Fire Prevention
Full Cost:
$ No Charged By: Date: Objective: Penalty 50% of Assessed Fee new Fire Not to Exceed $500
R. No.: Prop 26 Exception: 5
Collected By: R. Date:

Fire Prevention
Full Cost:

Adminstrative Citations
Late filing of
documents/reports/information
Late Payment of Operational
Fire Permit Fee - >30 days
Linked to California Fire Code
Section 105.5
Reference: CMD 109 7 - 53 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / DOCUMENT FEES RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) ---------
DESCRIPTION OF APPLIES COLLECTING Percent
FEE , RATE OR CHARGE (Yes or No) DEPT / DIV Change
Laseriche / Microfilm Copies $ 25.00 No Charged By: Date: 6/22/2021 Objective: Recover Cost $ 25.00 Fire
R. No.: 21-8981 Prop 26 Exception: 1,2
Collected By: R. Date: 6/22/2021
Fire
Full Cost: 69.83$
Photographs $ 25.00 No Charged By: Date: 6/22/2021 Objective: Recover Cost $ 25.00 Fire
R. No.: 21-8981 Prop 26 Exception: 1,2
Collected By: R. Date: 6/22/2021
Fire
Full Cost: 69.83$
plus actual cost
plus actual cost

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
plus actual
cost
2023-24FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION PROPOSED NEW
(SEE READER'S GUIDE)
plus actual
cost

CURRENT
FEE
and
PERIOD

OR REVISED FEE
Records request
Recover less than full cost
Records request
Recover less than full cost

COMMENTS

DATE FEE

LAST CHANGED

RESOLUTION

NUMBER & DATE
(if applicable)
Reference: CMD 109 7 - 54 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CUPA FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change $ 414.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Collected via other Hazardous Annual Fire User Fee Waste Generator Fees
Used Oil Only R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
$ 414.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 451.00 8.9% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 488.53$
$ 633.75 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 666.00 5.1% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 698.79$
$ 633.75 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 805.00 27.0% Annual Fire User Fee
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 978.10$
1,000 Kg to 4.99 Tons
100 kg to 999 kg

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Hazardous Waste Generator
Fees:

COMMENTS 2023-24

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)and
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Not a new fee - restructuring
PERIOD

CURRENT
FEE
Hazardous Waste Generator
Fees:

Hazardous Waste Generator
Fees:

FULL COST FACTOR
Less than 100 Kg per
year
Hazardous Waste Generator
Fees:

Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Less than 5 tons per
year
Reference: CMD 109 7 - 55 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CUPA FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
COMMENTS 2023-24

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)and
PERIOD

CURRENT
FEE

FULL COST FACTOR
$ 855.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,125.00 31.6% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,396.54$
$ 1,020.75 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,239.00 21.4% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,675.85$
$ 2,113.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,340.00 10.7% Annual Fire User Fee Annual
CalARP Facility R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 2,793.09$
$ 2,537.25 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,808.00 10.7% Annual Fire User Fee Annual
CalARP Facility R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 3,351.70$
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Operating Permit
Program 1
25 tons and greater
California Accidental Release
Program (CALARP) Fees:

Hazardous Waste Generator
Fees:

California Accidental Release
Program (CALARP) Fees:

Operating Permit
Program 2
Hazardous Waste Generator
Fees:
5 tons to less than 25
tons per year
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Reference: CMD 109 7 - 56 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CUPA FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
COMMENTS 2023-24

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)and
PERIOD

CURRENT
FEE

FULL COST FACTOR
$ 2,537.25 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,808.00 10.7% Annual Fire User Fee Annual
CalARP Facility R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 3,351.70$
$ 236.25 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 250.00 5.8% per hour Fire User Fee per hour
RMP Review Fee R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 279.31$
$ 1,574.25 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,794.00 14.0% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 2,234.47$
$ 1,077.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,183.00 9.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,396.54$
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Onsite treatment of Hazardous
Waste Annual Fee - Highest
Tier:

Conditionally Authorized
California Accidental Release
Program (CALARP) Fees:

Onsite treatment of Hazardous
Waste Annual Fee - Highest
Tier:

Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Permit by Rule
Operating Permit
Program 3
California Accidental Release
Program (CALARP) Fees:
per hour
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Reference: CMD 109 7 - 57 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CUPA FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
COMMENTS 2023-24

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)and
PERIOD

CURRENT
FEE

FULL COST FACTOR
$ 423.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 468.00 10.6% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
$ No Charged By: Date: 7/14/2009 Objective: User Fee Set by State Collected by $ Fire City and paid to State.

CUPA Oversight Fee R. No.: 09-7653
Collected By: R. Date: 7/14/2009 Prop 26 Exception: 1,2,3 Finance
Full Cost: N/A
$ No Charged By: Date: 7/14/2009 Objective: User Fee Set by State Collected by $ Fire City and paid to State.

Underground Tank Fee R. No.: 09-7653
Collected By: R. Date: 7/14/2009 Prop 26 Exception: 1,2,3 Finance
Full Cost: N/A
$ No Charged By: Date: 7/14/2009 Objective: User Fee Set by State Collected by $ Fire City and paid to State.

R. No.: 09-7653
Collected By: R. Date: 7/14/2009 Prop 26 Exception: 1,2,3 Finance
Full Cost: N/A
As Determined
by State
Regulation
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
As Determined
by State
Regulation
State of California Annual
Surcharges:

As
Determined
by State
Regulation
State of California Annual
Surcharges:

As
Determined
by State
Regulation
California Accidental
Release Prevention
Program
As
Determined
by State
Regulation
Conditionally Exempt
State of California Annual
Surcharges:

As Determined
by State
Regulation
Onsite treatment of Hazardous
Waste Annual Fee - Highest
Tier:

Reference: CMD 109 7 - 58 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CUPA FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
COMMENTS 2023-24

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)and
PERIOD

CURRENT
FEE

FULL COST FACTOR
$ No Charged By: Date: 4/21/2015 Objective: User Fee Set by State Collected by $ Fire City and paid to State.

R. No.: 15-8226
Collected By: R. Date: 4/21/2015 Prop 26 Exception: 1,2,3 Finance
Full Cost: N/A
$ 518.63 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 578.00 11.4% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 698.27$
$ 690.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 832.00 20.6% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,117.23$
$ 927.75 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,084.00 16.8% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,396.54$
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
As Determined
by State
Regulation
State of California Annual
Surcharges:

Aboveground Petroleum
Storage Act
As
Determined
by State
Regulation
Aboveground Petroleum
Storage Tank Program
Aboveground Petroleum
Storage Tank Program
Aboveground Petroleum
Storage Tank Program
<1,320 gallon capacity
1,320 - 10,000 gallon
capacity
More than 10,000 gallon
capacity
Reference: CMD 109 7 - 59 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CUPA FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
COMMENTS 2023-24

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)and
PERIOD

CURRENT
FEE

FULL COST FACTOR
$ 459.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 492.00 7.2% Annual Fire User Fee Annual
R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
$ 1,456.69 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,646.00 13.0% Annual Fire User Fee Annual
First Tank R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 2,024.99$
$ 474.75 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 502.00 5.7% Annual Fire User Fee Annual
Each additional tank R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 558.62$
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Aboveground Petroleum
Storage Tank Program
Underground Hazardous
Materials Tank:

Underground Hazardous
Materials Tank:

Tank in Underground
Area (TIUGA)
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Reference: CMD 109 7 - 60 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CUPA FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
COMMENTS 2023-24

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)and
PERIOD

CURRENT
FEE

FULL COST FACTOR
$ 489.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 605.00 23.7% Annual Fire User Fee Annual
1-3 chemicals R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 837.93$
$ 738.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 864.00 17.1% Annual Fire User Fee Annual
4-6 chemicals R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,117.23$
$ 1,107.75 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,297.00 17.1% Annual Fire User Fee Annual
7-9 chemicals R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,675.85$
$ 1,497.75 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,743.00 16.4% Annual Fire User Fee Annual
10-15 chemicals R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 2,234.47$
Hazardous Materials Business
Plan
Hazardous Materials Business
Plan
Hazardous Materials Business
Plan
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Hazardous Materials Business
Plan
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Reference: CMD 109 7 - 61 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

FIRE / CUPA FEES RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- RESOLUTION
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
COMMENTS 2023-24

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)and
PERIOD

CURRENT
FEE

FULL COST FACTOR
$ 1,912.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,206.00 15.3% Annual Fire User Fee Annual
16-21 chemicals R. No.: 22-9081
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 2,793.09$
$ 57.94 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 61.00 5.3% Annual Fire User Fee Annual
Each additional chemical R. No.: 22-9081
> 21 chemical Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2,3 Finance
Full Cost: 69.83$
Hazardous Materials Business
Plan
Hazardous Materials Business
Plan
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Phasing in over 4 year period
FY 22/23: 1/4
FY 23/24: 1/4
FY 24/25: 1/4
FY 25/26: 1/4
Reference: CMD 109 7 - 62 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
Library

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

LIBRARY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change Overdue fines covering $ 1.50 No Charged By: Date: 6/11/2013 Objective: Penalty Fine is assessed to $ 1.50 interlibrary loans per item Library encourage prompt return per item per day O. No.: Prop 26 Exception: 5 of the materials. per day Collected By: O. Date:

Library Full Cost: N/A
Overdue fines - all other items $ 0.25 No Charged By: Date: 4/22/2014 Objective: Penalty Eliminating fines for $ 0.25 excluding children's books per item per day Library late return of materials per item per day O. No.: Prop 26 Exception: 5 per recommendation of
$ 8.00 No Collected By: O. Date: Board of Library Trustees. $ 8.00 maximum per Library Full Cost: N/A maximum per
item item
Replacement for library $ Current costs No Charged By: Date: 4/18/2017 Objective: Recover Cost Processing fee incurred to $ Current costs materials of item Library recover some of the cost of of item +processing fee: O. No.: Prop 26 Exception: 1,2 replacing library materials. +processing fee:
$ 5.00 No Collected By: O. Date: Two tier system: $ 5.00 or Library Full Cost: 48.27$ $5.00 for paperbacks and or $ 15.00 No $15.00 all other items $ 15.00
Replacement fee for lost $ 2.00 No Charged By: Date: 4/22/2014 Objective: Recover Cost Cost recovery for replacing $ 2.00 or damaged library card Library a lost or damaged library card; O. No.: Prop 26 Exception: 1,2 1st replacement at no charge.

Collected By: O. Date:

Library Full Cost: 4.20$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

CURRENT
FEE
and

PERIOD FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 8 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

LIBRARY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

CURRENT
FEE
and

PERIOD FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Replacement Fees for No Charged By: Date: Objective: Penalty Fees are in place. Adding to Portable Electronic Devices Library Citywide fee schedule for fee O. No.: schedule clarity
Chromebooks Replacement Fee $ 265.00 Collected By: O. Date: Prop 26 Exception: 5 $ 265.00 Library
Mobile Hotspot Replacement $ 60.00 Full Cost: N/A $ 60.00 Fee
Fitbit Zip Replacement Fee $ 59.95 $ 59.95 Lost Sleeve $ 20.00 $ 20.00
Lost Clear Case Box $ 2.00 $ 2.00 Fee for borrowing materials $ 10.00 No Charged By: Date: 5/8/2018 Objective: Recover Cost $ 10.00 from other libraries per item Library per item
(interlibrary loan) O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:

Library Full Cost: 112.29$
Replacement fee for lost $ 115.00 No Charged By: Date: 6/10/2003 Objective: Recover Cost Replacement fee is $ 115.00 Link+ materials borrowed Library collected by the library and from other libraries O. No.: Prop 26 Exception: 1,2 transferred to the owning Collected By: O. Date: library; fee amount is
Library Full Cost: Actual Cost determined by Link+
consortium.

Collection Agency Fee $ 16.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Fee is assessed to recover $ 16.00 Library Asset Recovery Library Penalty the cost charged by R. No.: 22-9081 collection agency to the
Collected By: R. Date: 4/19/2022 Prop 26 Exception: 1,2 library for resolving Library delinquent accounts.

Full Cost: 27.28$
Reference: CMD 109 8 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

LIBRARY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

CURRENT
FEE
and

PERIOD FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Overdue Fines for $ 15.00 No Charged By: Date: 6/12/2012 Objective: Penalty Fine is assessed to $ 15.00 Portable Electronic Devices Library encourage prompt return O. No.: of portable electronic
Collected By: O. Date: Prop 26 Exception: 5 devices.

Library
No Full Cost: N/A
Fee for using library Charged By: Date: 6/21/2022 Objective: User Fee meeting room Library
R. No.: 22-9112 Prop 26 Exception: 4
Residents / Non-Profits $ 20.00 No Collected By: R. Date: 6/21/2022 $ 20.00 per meeting Library Full Cost: N/A per meeting
Non-residents $ 90.00 No $ 90.00
per hour per hour
Additional assistance required $ 30.00 No $ 30.00
per hour per hour
Reference: CMD 109 8 - 3 Form: FEEFORM Revised: May 2011

This page is intentionally left blank.

Municipal Fee Schedule
Parks and Recreation

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

SITE PREPARATION
Casket Burial, Install Single Burial Vault, $ 3,639.24 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 3,807.00 4.6% Single Depth Grave Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 3,807.00$
Finance
Casket Burial, Install Single Burial Vault, $ 3,692.91 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 3,863.00 4.6% Double Depth Grave Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 3,863.00$
Finance
Casket Burial, Install Companion Vault, $ 4,430.87 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 4,635.00 4.6% Double Depth Grave Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 4,635.00$
Finance
Casket Burial, Pre-Installed Companion Vault, $ 3,375.01 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 3,530.00 4.6% Double Depth Grave Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 3,530.00$
Finance

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Casket Burial, Install One Small Burial Vault $ 275.57 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 288.00 4.5% (infants/babies), Single Depth Grave Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 288.00$
Finance
Casket - One casket Burial in a grave, with
existing cremation(s)
$ 3,586.60 No Charged by:

Date: 4/19/2022
Objective: Recover Cost $ 3,751.00 4.6% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 3,751.00$
Finance
Cremation - One cremation burial in a Grave $ 1,476.96 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 1,545.00 4.6% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 1,545.00$
Finance
Cremation - One Cremation placement in a $ 1,160.10 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 1,213.00 4.6% Niche. Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 1,213.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Casket - One casket placement in a Crypt $ 2,321.23 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 2,428.00 4.6% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 2,428.00$
Finance
Disinterment - One Casket from a Grave $ 4,430.87 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 4,635.00 4.6% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 4,635.00$
Finance
Disinterment - One Casket from a Crypt $ 2,109.64 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 2,206.00 4.6% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 2,206.00$
Finance
Disinterment of One Cremation from a $ 1,054.82 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 1,103.00 4.6% Grave Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 1,103.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Disinterment of One Cremation from a $ 580.05 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 606.00 4.5% Niche Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 606.00$
Finance
$ 5,344.29 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 5,590.00 4.6% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 5,590.00$
Finance

MARKER INSTALLATION
Installation of a monobar, emblem, flower $ Actual Cost No Charged by: Date: Objective: Recover Cost Service performed by outside $ Actual Cost vase, or ring on a crypt (each) Cemetery agency
R. No.: Prop 26 Exception: N/A charge is market rate
Collected By: R. Date:

Cemetery & Full Cost: Actual Cost
Finance
Installation of a flower vase and ring on a $ Actual Cost No Charged by: Date: Objective: Recover Cost Service performed by outside $ Actual Cost niche (each) Cemetery agency
R. No.: Prop 26 Exception: N/A charge is market rate
Collected By: R. Date:

Cemetery & Full Cost: Actual Cost
Finance
Inscribe shutters or grave markers $ Actual Cost No Charged by: Date: Objective: Recover Cost Service performed by outside $ Actual Cost (per letter charge) Cemetery agency
R. No.: Prop 26 Exception: N/A charge is market rate
Collected By: R. Date:

Cemetery & Full Cost: Actual Cost
Finance
Disinter and reinter casket into same grave to
make Grave extra depth (Vault not included)
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Installation of a niche plaque (each) $ Actual Cost No Charged by: Date: Objective: Recover Cost Service performed by outside $ Actual Cost Cemetery agency
R. No.: Prop 26 Exception: N/A charge is market rate
Collected By: R. Date:

Cemetery & Full Cost: Actual Cost
Finance
Installation of grave marker in South $ 284.42 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 297.00 4.4% Babyland, Babyland, Children's Garden and Cemetery
Oak Grove Infant R. No.: 22-9081 Prop 26 Exception: N/A Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 297.00$
Finance
Flat marker (10"x18" or 12"x24") set into $ 217.31 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 227.00 4.5% earth Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 227.00$
Finance
Flat marker (20"x28") set into $ 270.58 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 283.00 4.6% earth Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 283.00$
Finance
Flat marker (10"x18" or 12"x24") set into $ 653.00 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 683.00 4.6% concrete frame, with or w/o vase cups Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 683.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
$ 421.10 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 440.00 4.5% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 440.00$
Finance
Remove and dispose of marker, $ 210.55 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 220.00 4.5% marker frame, plaque, vase and ring Cemetery
upon request R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 220.00$
Finance

PROFESSIONAL SERVICES
Vault Disposal $ 421.10 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 440.00 4.5% Casket Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 440.00$
Finance
Vault Disposal $ 70.18 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 73.00 4.0% Cremation Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 73.00$
Finance
Single (34" x 12") or Double (46" x 12")
Upright Monument Foundation
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Sanitize Crypt $ 1,476.96 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 1,545.00 4.6% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 1,545.00$
Finance
City to repurchase interment rights $ 205.39 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 214.00 4.2% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 214.00$
Finance
Burial Permit Filing Fee $ 412.85 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 431.00 4.4% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 431.00$
Finance
$ 632.69 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 661.00 4.5% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 661.00$
Finance
Dig single depth grave to double depth
(Grave, casket)
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
No Charged by: Date: Objective: Recover Cost Purpose of fee is to recover $ 440.00 new Cemetery costs of additional
R. No.: Prop 26 Exception: N/A maintenance incurred during Collected By: R. Date: initial year of burial.

Cemetery & Full Cost: 440.00$
Finance
Hourly Rate (Personnel) $ 210.55 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 220.00 4.5% Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 220.00$
Finance
Custom Hourly Rate $ Actual Cost No Charged by: Date: Objective: Recover Cost $ Actual Cost Cemetery
R. No.: Prop 26 Exception: N/A
Collected By: R. Date:

Cemetery & Full Cost: Actual Cost
Finance
First Year Maintenance Fee
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Saturday Service - Casket (Hourly Rate) $ Actual Cost No Charged by: Date: Objective: Recover Cost $ Actual Cost Cemetery
R. No.: Prop 26 Exception: N/A
Collected By: R. Date:

Cemetery & Full Cost: Actual Cost
Finance
Saturday Service - Cremation (Hourly Rate) $ Actual Cost No Charged by: Date: Objective: Recover Cost $ Actual Cost Cemetery
R. No.: Prop 26 Exception: N/A
Collected By: R. Date:

Cemetery & Full Cost: Actual Cost
Finance
Chapel rental - Two Hours of Use No Charged by: Date: 4/19/2022 Objective: Recover Cost Cemetery
Non- Resident $ 334.41 R. No.: 22-9081 Prop 26 Exception: N/A $ 349.00 4.4% Collected By: R. Date: 4/19/2022
Resident $ No Charge Cemetery & Full Cost: 349.00$ $ No Charge Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

PERPETUAL CARE (ENDOWMENT)
Casket - Two Caskets Below Ground Burial Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 5,475.00 4.6 - 97.7% Cemetery fee categories.

Non-Resident $ 5,233.85 No R. No.: 22-9081 Prop 26 Exception: N/A $ 5,475.00 4.6% Collected By: R. Date: 4/19/2022
Resident $ 2,768.99 No Cemetery & Full Cost: 5,475.00$ $ 5,475.00 97.7% Finance
Casket - Two Caskets Above Ground Burial Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 5,475.00 4.6% Cemetery fee categories.

Non-Resident $ 5,233.85 No R. No.: 22-9081 Prop 26 Exception: N/A $ 5,475.00 4.6% Collected By: R. Date: 4/19/2022
Resident $ 5,233.85 No Cemetery & Full Cost: 5,475.00$ $ 5,475.00 4.6% Finance
Casket - One Casket Below Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 2,735.00 4.6% Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 2,615.38 No Collected By: R. Date: 4/19/2022 $ 2,735.00 4.6% Cemetery & Full Cost: 2,735.00$
Resident $ 2,615.38 No Finance $ 2,735.00 4.6% Cremation - Two Cremations Below Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 5,475.00 4.6 - 97.7% Burial Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 5,233.85 No Collected By: R. Date: 4/19/2022 $ 5,475.00 4.6% Cemetery & Full Cost: 5,475.00$
Resident $ 2,768.99 No Finance $ 5,475.00 97.7% (Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Cremation - One Cremation Below Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 2,738.00 4.6 - 97.7% Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 2,617.44 No Collected By: R. Date: 4/19/2022 $ 2,738.00 4.6% No Cemetery & Full Cost: 2,738.00$
Resident $ 1,383.40 Finance $ 2,738.00 97.9% Cremation -Two Cremations Above Ground
Burial
Charged by:

Cemetery Date: 4/19/2022
Objective: Recover Cost Consolidate endowment $ 5,475.00 4.6 - 97.7% fee categories.

Non-Resident $ 5,233.85 No R. No.: 22-9081 Prop 26 Exception: N/A $ 5,475.00 4.6% Collected By: R. Date: 4/19/2022
Resident $ 2,768.99 No Cemetery & Full Cost: 5,475.00$ $ 5,475.00 97.7% Finance
Casket - One Casket - Babyland, Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 345.00 4.5 - 18.8% South Babyland, Children's Garden Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 330.28 No Collected By: R. Date: 4/19/2022 $ 345.00 4.5% Cemetery & Full Cost: 345.00$
Resident $ 290.44 No Finance $ 345.00 18.8% Cremation - Two Cremations Above Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 5,475.00 4.6 - 31.8% Bank of Memories Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 5,233.85 No Collected By: R. Date: 4/19/2022 $ 5,475.00 4.6% Cemetery & Full Cost: 5,475.00$
Resident $ 4,153.48 No Finance $ 5,475.00 31.8% (Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Casket - One Casket - Above Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 5,475.00 4.6 - 31.8% Indoor Mausoleum Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 5,233.85 No Collected By: R. Date: 4/19/2022 $ 5,475.00 4.6% Cemetery & Full Cost: 5,475.00$
Resident $ 4,153.48 No Finance $ 5,475.00 31.8% Cremation - Four Cremations Above Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 10,951.00 4.6 - 31.8% Indoor Mausoleum Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 10,468.74 No Collected By: R. Date: 4/19/2022 $ 10,951.00 4.6% Cemetery & Full Cost: 10,951.00$
Resident $ 8,305.87 No Finance $ 10,951.00 31.8% Cremation - One Cremation Above Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 2,738.00 4.6 - 31.8% Indoor Community Mausoleum Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 2,617.44 No Collected By: R. Date: 4/19/2022 $ 2,738.00 4.6% Cemetery & Full Cost: 2,738.00$
Resident $ 2,076.74 No Finance $ 2,738.00 31.8% Casket - One Casket Above Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 5,475.00 4.6 - 31.8% Garden Mausoleum Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 5,233.85 No Collected By: R. Date: 4/19/2022 $ 5,475.00 4.6% Cemetery & Full Cost: 5,475.00$
Resident $ 4,153.48 No Finance $ 5,475.00 31.8% (Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 12 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Casket - Two Caskets Above Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 10,951.00 4.6 - 31.8% Garden Mausoleum Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 10,468.74 No Collected By: R. Date: 4/19/2022 $ 10,951.00 4.6% Cemetery & Full Cost: 10,951.00$
Resident $ 8,305.87 No Finance $ 10,951.00 31.8% Cremation - Two Cremations Above Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 5,475.00 4.6 - 97.7% Garden Mausoleum Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 5,233.85 No Collected By: R. Date: 4/19/2022 $ 5,475.00 4.6% Cemetery & Full Cost: 5,475.00$
Resident $ 2,768.99 No Finance $ 5,475.00 97.7% Cremation - Four Cremations Below Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 10,951.00 4.6 - 97.8% Oak Grove Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 10,468.74 No Collected By: R. Date: 4/19/2022 $ 10,951.00 4.6% Cemetery & Full Cost: 10,951.00$
Resident $ 5,536.88 No Finance $ 10,951.00 97.8% (Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 13 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

CURRENT TECHNOLOGY DEPT / DIV LAST CHANGED
FEE FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF and APPLIES COLLECTING NUMBER & DATE COMMENTS OR REVISED FEE Percent FEE , RATE OR CHARGE PERIOD (Yes or No) DEPT / DIV (if applicable) ** Plus sales tax. 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Casket - One Casket - Below Ground Charged by: Date: 4/19/2022 Objective: Recover Cost Consolidate endowment $ 692.00 4.6 - 18.7% Oak Grove Infant Cemetery fee categories.

R. No.: 22-9081 Prop 26 Exception: N/A
Non-Resident $ 661.59 No Collected By: R. Date: 4/19/2022 $ 692.00 4.6% Cemetery & Full Cost: 692.00$
Resident $ 583.06 No Finance $ 692.00 18.7%

BURIAL MATERIALS
Burial Materials processing Fee $ 136.24 No Charged by: Date: 4/19/2022 Objective: Recover Cost $ 142.00 4.2% All materials are priced at actual cost Cemetery
R. No.: 22-9081 Prop 26 Exception: N/A
Collected By: R. Date: 4/19/2022
Cemetery & Full Cost: 142.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 9 - 14 Form: FEEFORM Revised: May 2011 FY 2022/23
Resident Rate
FY 2023/24
Resident Rate
Change
%
FY 2022/23
Non-Resident Rate
FY 2023/24
Non-Resident Rate
Change
%
Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier A $23,707 $27,298 15.15% $29,633 $32,115 8.37% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier B or C $25,756 $29,657 15.15% $32,194 $34,890 8.37% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier D $21,978 $25,308 15.15% $27,474 $29,774 8.37% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier E $19,922 $22,940 15.15% $24,903 $26,989 8.37% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier A $27,261 $31,391 15.15% $34,077 $36,930 8.37% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier B-C $29,619 $33,816 14.17% $36,710 $39,784 8.37% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier D $25,275 $29,103 15.15% $31,594 $34,239 8.37% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier E $22,910 $26,380 15.15% $28,637 $31,035 8.37% Casket Crypts Right to inter two decedents, Garden Mausoleum, All tiers $39,845 $44,045 10.54% $47,813 $51,817 8.37% Casket Crypts Right to inter two decedents, Indoor Mausoleum, All tiers $54,523 $60,269 10.54% $65,427 $70,905 8.37% Casket Grave Right to inter one decedent, Oak Grove Infant $583 $645 10.54% $700 $758 8.37% Casket Grave Right to inter one decedent, flat marker section* $4,135 $4,762 15.16% $5,170 $5,603 8.37% Casket Grave Right to inter one decedent, upright monument section** $6,409 $7,380 15.15% $8,012 $8,683 8.37% Casket Grave Right to inter two decedents, flat marker section* $5,809 $6,688 15.14% $7,261 $7,869 8.37% Casket Grave Right to inter two decedents, upright monument section** $8,425 $9,728 15.47% $10,560 $11,444 8.37% Casket/Cremation Grave Right to inter one decedent, Babyland, South Babyland and Children's Garden
$292 $322 10.54% $350 $379 8.37%
Cremation Grave Right to inter four cremations in a grave, upright monument section** $9,288 $10,266 10.53% $11,144 $12,077 8.37% Cremation Grave Right to inter three cremations in a grave, upright monument section** $5,807 $6,418 10.53% $6,967 $7,550 8.37% Cremation Grave Right to inter two cremations in a grave, upright monument section** $4,644 $5,133 10.53% $5,572 $6,039 8.37% Cremation Grave Right to inter one cremation in a grave with a casket $1,935 $2,138 10.50% $2,321 $2,515 8.37% Cremation Grave Right to inter two cremations in a grave, Willow Bend Way and Sunrise Gardens
$3,871 $4,457 15.15% $4,839 $5,244 8.37%
Cremation Niche Right to inter two cremations in Bank of Memories, Tiers M-T $1,018 $1,172 15.12% $1,272 $1,379 8.37% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers I-L $1,222 $1,407 15.15% $1,528 $1,656 8.37% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers E-H $1,433 $1,650 15.13% $1,791 $1,941 8.37% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers A-D $1,222 $1,407 15.15% $1,528 $1,656 8.37% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 1-2 $9,330 $10,313 10.54% $11,196 $12,133 8.37% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 3-5 $9,330 $10,313 10.54% $11,196 $12,133 8.37% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 6-8 $9,330 $10,313 10.54% $11,196 $12,133 8.37% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 9-10 $9,330 $10,313 10.54% $11,196 $12,133 8.37% Cremation Niche Right to inter one cremation in Indoor Community Mausoleum $2,332 $2,686 15.15% $2,916 $3,160 8.37% Cremation Niche Right to inter two cremations in Garden Court or Sunset Garden Niche Bank, Tiers E-F
$3,662 $4,217 15.15% $4,577 $4,961 8.37%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tier D
$3,258 $3,752 15.16% $4,074 $4,415 8.37%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tier C
$2,847 $3,278 15.14% $3,558 $3,856 8.37%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tiers A-B
$2,358 $2,716 15.17% $2,948 $3,195 8.37%
Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier A - D $3,662 $4,048 10.54% $4,394 $4,762 8.37% Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier E - H $3,258 $3,601 10.51% $3,909 $4,236 8.37% Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier I - J $2,847 $3,147 10.53% $3,416 $3,702 8.37% Interment Rights
Mission City Memorial Park Interment Rights and Burial Materials Fee Schedule ** Azalea Lawn, Begonia Lawn, Camellia Lawn, Greek Annex, Greek Plot, Oak Grove, Valley Oak, Cypress Lawn, Sections D, E, F, EE, G, H, J, K, P, and T, All corridors and family blocks. * Acacia Lawn, Hillside Lawn, Palm Lawn, Palm Hill, Redwood Grove, Section L, Section S, Serenity Lawn, Willow Bend Way, Evergreen. 9 - 15
Mission City Memorial Park Interment Rights and Burial Materials Fee Schedule Burial Materials FY 2022/23
Resident Rate
FY 2023/24
Resident Rate
Change
%
FY 2022/23
Non-Resident Rate
FY 2023/24
Non-Resident Rate
Change
%
Casket Crypt Casket tray and absorbant pad Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Crypt Monbar/unibar Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Crypt Shutter replacement, crypt Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, companion casket vault (G3086-5) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra long, single casket vault G3690-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra small casket vault, child (V1637-1) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra wide, single casket vault (G4490-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, single casket vault (G3086-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, small casket vault, infant (U711) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Grave Outer Burial Container, double cremation vault (U711) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Grave Outer Burial Container, single cremation vault Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Bank of Memories (5660 TC and BC) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Bank of Memories (5660 TCB) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Garden mausoleum Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Shutter replacement, niche Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket/Cre-mation Niche/Crypt Bronze Flower Vase Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket/Cre-mation Niche/Crypt Plastic Flower Vase and Bronze Vase Ring Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Emblem (custom under 8") Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Emblem (stand alone) Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
9 - 16
SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change Community Recreation Center: No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Full cost includes kitchen.

Auditorium Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 Hourly Staff costs may be charged for Full Cost: Varies bookings, in addition to the
Auditorium w/o Kitchen: Non-profit $ 20.00 1% - 20% Cost Recovery room rental fee. $ 20.00 Meeting per meeting Staffing needs determined by per meeting Parks & Recreation staff based on
Auditorium w/ Kitchen: Non-Profit $ 20.00 1% - 20% Cost Recovery hours of use, estimated attendance $ 20.00 Event per hour and scope of event. per hour
Auditorium with Kitchen: Resident $ 200.00 Market Rate $ 200.00 Event per hour per hour
Commercial/Non-Resident $ 300.00 Collected By: 100% Cost Recovery $ 300.00 Event per hour Parks & Rec. per hour
Community Recreation Center: No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly Staff costs may be charged to Meeting Rooms Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the room(s) fee.

Full Cost: Varies Staffing needs determined by
Non-profit meeting $ 20.00 Collected By: 1% - 20% Cost Recovery Parks & Recreation staff based on $ 20.00 per meeting Parks & Rec. hours of use, estimated attendance per meeting and scope of event.

Park Building Room Rentals No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly Staff costs may be charged to Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the room(s) fee.

Full Cost: Varies Staffing needs determined by
Non-profit meeting $ 20.00 Collected By: 1% - 20% Cost Recovery Parks & Recreation staff based on $ 20.00 per meeting hours of use, estimated attendance per meeting Parks & Rec. and scope of event.

Non-profit event $ 20.00 1% - 20% Cost Recovery $ 20.00 per hour per hour
Resident Event $ 60.00 Market Rate $ 60.00
per hour per hour
Commercial/Non-resident Event $ 90.00 Market Rate $ 90.00 per hour per hour

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD (if applicable) FULL COST FACTOR COMMENTS Reference: CMD 109 9 - 17 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD (if applicable) FULL COST FACTOR COMMENTS Central Park Picnic Areas Flat rate per No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly Staff costs may be charged to section, per day Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the facility(s) fee.

Full Cost: Varies Staffing needs determined by
Non-profit event $ 40.00 1% - 20% Cost Recovery Parks & Recreation staff based on $ 40.00 Collected By: hours of use, estimated attendance per day Resident event $ 200.00 Parks & Rec. Market Rate and scope of event. $ 200.00 per day
Commercial/Non Resident event $ 600.00 Market Rate $ 600.00 per day
Electricity Activitation and Use Fee $ 20.00 new
(per hour) per hour
City Plaza Park Gazebo Cost per day No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly Staff costs may be charged to Cost per day R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the facility(s) fee.

Non-profit event $ 40.00 Collected By: 1% - 20% Cost Recovery Full Cost: Varies Staffing needs determined by $ 40.00 event, open to the public. per day Parks & Rec. Parks & Recreation staff based on per day hours of use, estimated attendance
Resident wedding $ 200.00 Parks & Rec. Market Rate and scope of event. $ 200.00 per day per day
Commercial/non-resident event $ 600.00 Market Rate $ 600.00 per day
Hourly Staff (as-needed) $ 35.00 No Charged By: R. No.: 21-8981 Objective: Recover Cost Staffing needs determined by $ 36.00 2.86% assigned to facility Per person, Parks & Rec. R. Date: 6/22/2021 Prop 26 Exception: 4 Parks & Recreation staff based on Per person per hour per hour Full Cost: $ rate x hrs. hours of use, estimated attendance Collected By: and scope of event.

Parks & Rec.

Equipment Rentals (as-needed)
Tables (each) $ 11.00 new
each
Chairs (each) $ 2.00 new
each
EZ-Up Canopy (each) $ 50.00 new
each
Podium $ 50.00 new
each
Portable Sound System $ 100.00 new
each
Reference: CMD 109 9 - 18 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD (if applicable) FULL COST FACTOR COMMENTS Senior Citizens Center: No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly Staff costs may be charged in Auditorium & Kitchen Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 addition to the room rental fee.

Full Cost: Varies Staffing needs determined by
Non-profit meeting (no kitchen) $ 20.00 1% - 20% Cost Recovery Parks & Recreation staff based on $ 20.00 per meeting hours of use, estimated attendance per meeting Collected By: and scope of event.

Non-profit event $ 20.00 Parks & Rec. 1% - 20% Cost Recovery $ 20.00 per hour per hour
Resident event $ 200.00 Market Rate $ 200.00
per hour per hour
Commercial/non-resident event $ 300.00 100% Cost Recovery $ 300.00 per hour per hour
Senior Citizens Center: No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly Staff costs may be charged in Rooms Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 addition to the room rental fee.

Full Cost: Varies Staffing needs determined by
Non-profit meeting $ 20.00 1% - 20% Cost Recovery Parks & Recreation staff based on $ 20.00 Per meeting hours of use, estimated attendance Per meeting Collected By: and scope of event.

Non-profit event 20.00 Parks & Rec. 1% - 20% Cost Recovery $ 20.00 per hour per hour
Resident event $ 60.00 Market Rate $ 60.00
per hour per hour
Commercial/non-resident event 90.00 Market Rate $ 90.00 per hour per hour
Youth Activity Center: No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Fee is exclusive of applicable fee Gymnasium Cost per hour Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 charged by Santa Clara Unified School Full Cost: Varies District, collected by the City.

Non-Profit event $ 20.00 1% - 20% Cost Recovery Hourly city staff costs may be charged $ 20.00 in addition to the room rental fee.

Resident event $ 200.00 Collected By: Market Rate Staffing needs determined by $ 200.00 Parks & Rec. Parks & Recreation staff based on
Commercial/Non-resident event $ 300.00 Market Rate hours of use, estimated attendance $ 300.00 and scope of event.

Cost per hour
Reference: CMD 109 9 - 19 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD (if applicable) FULL COST FACTOR COMMENTS Youth Activity Center: Cost per hour No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Fee is exclusive of applicable fee Activity Rooms Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 charged by Santa Clara Unified School Full Cost: Varies District, collected by the City.

Non-profit meeting $ 20.00 1% - 20% Cost Recovery Hourly city staff costs may be charged $ 20.00 per meeting in addition to the room rental fee. per meeting Staffing needs determined by
Non-profit event $ 20.00 1% - 20% Cost Recovery Parks & Recreation staff based on $ 20.00 per hour hours of use, estimated attendance per hour
and scope of event.

Resident event $ 60.00 Market Rate $ 60.00
Per hour Per hour
Collected By:

Commercial/non-resident event 90.00 Parks & Rec. Market Rate $ 90.00 per hour per hour
Fields and turf areas Cost per hour No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly city staff costs may be charged Cost per hour reservations: Practice & Games Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the room rental fee.

Full Cost: Varies Staffing needs determined by
Non-Profit $ 14.00 Collected By: 1% - 20% Cost Recovery Parks & Recreation staff based on $ 14.00 Parks & Rec. hours of use, estimated attendance
Resident $ 100.00 Market rate and scope of event. $ 100.00 Commercial/Non Resident $ 280.00 Market rate $ 280.00
Vendor requested adjustments
Tennis Reservations $ 11.00 No Charged By: R. No.: 21-8981 Objective: Recover Cost Per hour rate/resident; $ 12.00 9.09% Tennis court reservations per hour Parks & Rec. R. Date: 6/22/2021 Prop 26 Exception: 4 prime time reserved. per hour are by agreement with (resident) Full Cost: Varies (resident) vendor. $ 13.00 Collected By: Per hour rate/non-resident; $ 14.00 7.69% per hour Parks & Rec. prime time reserved. per hour
(non-resident) (non-resident)
$ 6.00 Per hour rate/resident; $ 7.00 16.67%
(resident) non-prime time. (resident)
$ 8.00 $ 10.00 25.00%
per hour Per hour rate/non-resident; per hour
(non-resident) non-prime time. (non-resident)
Fees are based on market rate.

Detailed in quarterly Activity Guide.

New fee structure proposed
New fee structure proposed
Reference: CMD 109 9 - 20 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD (if applicable) FULL COST FACTOR COMMENTS Recreation Cancellation Fee Flat fee No Charged By: R. No.: 21-8981 Objective: Recover Cost Cancellation must be requested Flat fee Rental cancellation fee $ 52.00 Parks & Rec. R. Date: 6/22/2021 Prop 26 Exception: 4 14 days or more in advance. $ 54.00 3.85% Full Cost: 54.73$ Applies to all facilities.

Collected By:

Parks & Rec.

Field Preparation No R. No.: 22-9081 & 22-9082 Objective: Recover Cost Consolidating field preparation fee Cost per day R. Date: 4/19/2022 Prop 26 Exception: 4 categories for fee schedule Cost per day Charged By: Full Cost: Varies simplification
Non-Profit $ 30.00 Parks & Rec. 1% - 20% Cost Recovery $ 30.00 Resident $ 150.00 Collected By: Market Rate $ 150.00
Parks & Rec.

Commercial/Non Resident $ 300.00 Market Rate $ 300.00
Amplified Music $ 72.00 No Charged By: R. No.: 21-8981 Objective: Recover Cost $ 75.00 4.17% Parks & Rec. R. Date: 6/22/2021 Prop 26 Exception: 4
Per event per day Full Cost: 75.92$ Per event per day Collected By:

Parks & Rec.

Teen Center: No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly city staff costs may be charged Multi-Purpose Room Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the room rental fee.

Full Cost: varies Staffing needs determined by
Non-profit meeting $ 20.00 1% - 20% Cost Recovery Parks & Recreation staff based on $ 20.00 per meeting hours of use, estimated attendance per meeting and scope of event.

Non-profit event $ 20.00 1% - 20% Cost Recovery $ 20.00 per hour per hour
Resident event $ 100.00 Collected By: Market Rate $ 100.00 per hour per hour
Parks & Rec.

Commercial/Non Resident event $ 150.00 Market Rate $ 150.00 per hour per hour
Reference: CMD 109 9 - 21 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD (if applicable) FULL COST FACTOR COMMENTS Teen Center: Cost range Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly city staff costs may be charged Cost range Classrooms depending on Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the room rental fee. depending on Full Cost: varies Staffing needs determined by
Non-profit meeting $ 20.00 Parks & Recreation staff based on $ 20.00 per meeting hours of use, estimated attendance per meeting No Collected By: and scope of event.

Parks & Rec.

Special Event Cost range Charged By: Date: 6/22/2021 Objective: Recover Cost One time application processing fee Cost range Application Fee depending on Parks & Rec. Prop 26 Exception: 4 per request; non-exclusive use of depending on priority (per hour) R. No.: 21-8981 Full Cost: 520.36$ public property based on Department priority (per hour) Resident Special Event $ 320.00 No Collected By: R. Date: 6/22/2021 Head approval. $ 334.00 4.38% Parks & Rec. City Code 9.35060
Resident, non-profit $ 26.00 No $ 27.00 3.85%
City Sponsored Event $ No Fee No $ No Fee
Non-resident $ 497.00 No $ 519.00 4.43%
Neighborhood Parks Flat rate per table No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly city staff costs may be charged Flat rate per table per day Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the room rental fee. per day Full Cost: Varies Staffing needs determined by
Non-Profit Event $ 20 Collected By: 1% - 20% Cost Recovery Parks & Recreation staff based on $ 20.00 Parks & Rec. hours of use, estimated attendance
Resident Event $ 60.00 Market Rate and scope of event. $ 60.00 Jump House Permit $ 25.00 No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Hourly city staff costs may be charged $ 25.00 Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 in addition to the room rental fee.

Resident- Jump House Permit flat rate per jump Staffing needs determined by flat rate per jump house per day Collected By: Parks & Recreation staff based on house per day Parks & Rec. Full Cost: 92.68$ hours of use, estimated attendance and scope of event.

Reference: CMD 109 9 - 22 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD (if applicable) FULL COST FACTOR COMMENTS Pool Rentals Cost per hour Charged By: Date: 4/19/2022 Objective: Recover Cost Hourly city staff costs may be charged Cost per hour Parks & Rec. Prop 26 Exception: 4 in addition to the room rental fee.

Shared Facility $ 80.00 R. No.: 22-9081 & 22-9082 Full Cost: Varies Staffing needs determined by $ 80.00 No Collected By: R. Date: 4/19/2022 Parks & Recreation staff based on Exclusive Use $ 280.00 Parks & Rec. hours of use, estimated attendance $ 280.00 and scope of event.

Tournament Fee: Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Fee is exclusive of applicable fee Competition, Meets, and Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 charged by custodial vendor, Tournaments that include Full Cost: Varies collected by the City. competitors from other cities. No Collected By:

Hourly city staff costs may be charged
Non-Profit $ 110.00 Parks & Rec. 40% Cost Recovery in addition to the base rental rates and. $ 110.00 per hour field prep fees. per day hour
Resident $ 110.00 40% Cost Recovery Staffing needs determined by $ 110.00 per hour Parks & Recreation staff based on per day hour hours of use, estimated attendance
Commercial/Non Resident $ 280.00 100% Cost Recovery and scope of event. $ 280.00 per hour per day hour
Parking at Parks and Per event No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost New fee for reserved parking Per event Recreation Facilities Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 $ 5-500 Full Cost: Varies $ 5-500
Collected By:

Parks & Rec.

Reference: CMD 109 9 - 23 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD (if applicable) FULL COST FACTOR COMMENTS Special Event Sponsorship/ Per event No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Per event Vendor Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 $ 0-50,000 Full Cost: Varies $ 0-50,000
Collected By:

Parks & Rec.

Special Event Concessions Per event No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Per event Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4
$ 0-100 Full Cost: Varies $ 0-100
Collected By:

Parks & Rec.

Recreation Classes Per activity No Charged By: R. No.: 22-9081 & 22-9082 Objective: Recover Cost Per activity Parks & Rec. R. Date: 4/19/2022 Prop 26 Exception: 4 Guide. $ 0-5,000 Full Cost: Varies $ 0-5,000
Collected By:

Parks & Rec.

Detailed in Activity
Reference: CMD 109 9 - 24 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95050 O. Nos.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Quimby Act (Single Fam) $ 62,664.00 No Collected By: O. Dates: 6/24/2014 FY 2022/23 $ 61,759.00 -1.4% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95050 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Quimby Act (Multi Fam) $ 50,468.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 49,738.00 -1.4% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95050 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Mitigation Fee Act (Single Fam) $ 55,716.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 55,072.00 -1.2% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95050 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Mitigation Fee (Multi Fam) $ 44,872.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 44,353.00 -1.2% Engineering 2/24/2015 Full Cost:
and NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

CURRENT
FEE
COMMENTSPERIOD (if applicable) FULL COST FACTOR
Reference: CMD 109 9 - 25 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change and NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

CURRENT
FEE
COMMENTSPERIOD (if applicable) FULL COST FACTOR
Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95051 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Quimby Act (Single Fam) $ 65,263.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 64,859.00 -0.6% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95051 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Quimby Act (Multi Fam) $ 52,561.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 52,235.00 -0.6% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95051 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Mitigation Fee (Single Fam) $ 57,968.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 57,758.00 -0.4% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95051 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Mitigation Fee (Multi Fam) $ 46,686.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 46,517.00 -0.4% Engineering 2/24/2015 Full Cost:

Reference: CMD 109 9 - 26 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change and NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

CURRENT
FEE
COMMENTSPERIOD (if applicable) FULL COST FACTOR
Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95054 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Quimby Act (Single Fam) $ 60,658.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 59,388.00 -2.1% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95054 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Quimby Act (Multi Fam) $ 48,852.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 47,829.00 -2.1% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: See Resolution 19-8769 and 21-8970 ZIP Code 95054 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Mitigation Fee (Single Fam) $ 53,977.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 53,017.00 -1.8% Engineering 2/24/2015 Full Cost:

Residential Development Charged By: Res. No.: 22-9081 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 4/19/2022 See Resolution 19-8769 and 21-8970 ZIP Code 95054 O. No.: 1928; 1937 Prop 26 Exception: 6 for fee calculation through policy Mitigation Fee (Multi Fam) $ 43,472.00 No Collected By: O. Date: 6/24/2014 FY 2022/23 $ 42,698.00 -1.8% Engineering 2/24/2015 Full Cost:

Reference: CMD 109 9 - 27 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PARKS & RECREATION / RECREATION RESOLUTION NUMBER: APPROVED:

CHARGING

TECHNOLOGY DEPT / DIV
FEE (3.37%) --------- PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV 2023-24 Change and NUMBER & DATE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

DATE FEE

LAST CHANGED

ORDINANCE

CURRENT
FEE
COMMENTSPERIOD (if applicable) FULL COST FACTOR
Residential Development Charged By: Res. No.: 22-9080 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 6/10/2021 See Resolution 19-8769, 21-8970 Patrick Henry Specific Plan O. No.: 1928; 1937 Prop 26 Exception: 6 and 22-9080 Area * $ 52,570.00 No Collected By: O. Date: 6/24/2014 for fee calculation through policy $ 52,570.00 0.0% Quimby Act (Single Fam) Engineering 2/24/2015 Full Cost: FY 2022/23 Residential Development Charged By: Res. No.: 22-9080 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 6/10/2021 See Resolution 19-8769, 21-8970 Patrick Henry Specific Plan O. No.: 1928; 1937 Prop 26 Exception: 6 and 22-9080 Area * $ 42,338.00 No Collected By: O. Date: 6/24/2014 for fee calculation through policy $ 42,338.00 0.0% Quimby Act (Multi Fam) Engineering 2/24/2015 Full Cost: FY 2022/23 Residential Development Charged By: Res. No.: 22-9080 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 6/10/2021 See Resolution 19-8769, 21-8970 Patrick Henry Specific Plan O. No.: 1928; 1937 Prop 26 Exception: 6 and 22-9080 Area * $ 46,697.00 No Collected By: O. Date: 6/24/2014 for fee calculation through policy $ 46,697.00 0.0% Mitigation Fee (Single Fam) Engineering 2/24/2015 Full Cost: FY 2022/23 Residential Development Charged By: Res. No.: 22-9080 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 6/10/2021 See Resolution 19-8769, 21-8970 Patrick Henry Specific Plan O. No.: 1928; 1937 Prop 26 Exception: 6 and 22-9080 Area * $ 37,609.00 No Collected By: O. Date: 6/24/2014 for fee calculation through policy $ 37,609.00 0.0% Mitigation Fee (Multi Fam) Engineering 2/24/2015 Full Cost: FY 2022/23 (* This fee is only effective from July 1, 2022 through June 30, 2023. Fees will revert back to the applicable zipcode rate beginning in July 1, 2023.) Reference: CMD 109 9 - 28 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
Police

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change Alarm Permit $ 37.00 No Charged By: Date: 5/8/2018 Objective: Penalty $ 37.00 Police
O. No.: 1748 Prop 26 Exception: 3
Collected By: O. Date: 2/15/2000
Police Full Cost: 99.90$
Non-registration $ 50.00 No Date: 1/28/2020 $ 50.00
Annual Renewal $ 15.00 No $ 15.00
Late $ 25.00 No O. No.: 2012 $ 25.00
Reinstatement $ 15.00 No O. Date: 1/14/2020 $ 15.00
Bingo Organization $ 1,305.17 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,365.00 4.6% Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022 Full Cost: 1,365.33$
Police
CAD report for legal $ 0.20 No Charged By: Date: 6/10/2008 Objective: Recover Cost $ 0.20 purposes per page Police per page
Per page Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:

Finance Full Cost: 0.21$

CD for legal purposes $ 3.00 No Charged By: Date: 6/10/2008 Objective: Recover Cost $ 3.00 per CD Police
Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:

Police Full Cost: 3.14$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD
(Regulatory Fee)
(Regulatory Fee)

OBJECTIVE
PROP 26 EXCEPTION
Does not include mandated
per CD
(SEE READER'S GUIDE)

FULL COST FACTOR
DOJ/FBI Live Scan fees.

Per Public Records Act
Reference: CMD 109 10 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Citation Sign Off $ 31.83 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 33.00 3.7% Police
Non-Santa Clara Citations Only R. No.: 22-9081 Prop 26 Exception: 1,2 Collected By: R. Date: 4/19/2022
Police Full Cost: 33.30$
Clearance Letter $ 48.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 50.00 4.2% Police
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Police Full Cost: 50.21$
Closing Out Sale $ 209.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 218.00 4.3% Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 218.98$

Color Photographs $ Actual Cost No Charged By: Date: 6/10/2008 Objective: Recover Cost $ Actual Cost 4" x 6" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:

Police Full Cost: Actual Cost
Actual cost of duplication.
(Regulatory Fee)
Reference: CMD 109 10 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Color Photographs $ Actual Cost No Charged By: Date: 6/10/2008 Objective: Recover Cost $ Actual Cost 5" x 7" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:

Police Full Cost: Actual Cost
Color Photographs $ Actual Cost No Charged By: Date: 6/10/2008 Objective: Recover Cost $ Actual Cost 8" x 10" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:

Police Full Cost: Actual Cost
Color Photographs $ Actual Cost No Charged By: Date: 6/10/2008 Objective: Recover Cost $ Actual Cost 11" x 14" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:

Police Full Cost: Actual Cost
Color Photographs $ Actual Cost No Charged By: Date: 6/10/2008 Objective: Recover Cost $ Actual Cost 16" x 20" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:

Police Full Cost: Actual Cost
Actual cost of duplication.

Actual cost of duplication.

Actual cost of duplication.

Actual cost of duplication.

Reference: CMD 109 10 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Color Photographs $ Actual Cost No Charged By: Date: 6/10/2008 Objective: Recover Cost $ Actual Cost 20" x 30" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:

Police Full Cost: Actual Cost
Crime Analysis Reports $ 0.20 No Charged By: Date: 6/10/2008 Objective: Recover Cost $ 0.20 per page Police User Fee per page
Res. No.: 08-7525
Collected By: Prop 26 Exception: 1,2
Police
Full Cost: 0.21$
Dispatch service required $ 226.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 236.00 4.4% for special events per hour Police per hour
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 236.42$
Driving Under the Influence Per current salary No Charged By: Date: 6/15/1999 Objective: Recover Cost Per current salary Emergency Response schedule plus Police schedule plus
benefits and current Government Code Prop 26 Exception: 1,2 benefits and current citywide overhead Collected By: Sections: 53150 citywide overhead Finance and 53154 Full Cost: As calculated
Actual cost of duplication.

Per Public Records Act
Reference: CMD 109 10 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
False Alarm Calls Charged By: Date: 1/28/2020 Objective: Recover Cost Police Penalty
Second false alarm $ 50.00 No R. No.: 2012 $ 50.00
Third false alarm $ 111.00 No R. Date: 1/14/2020 Prop 26 Exception: 1,2,5 $ 111.00 Fourth false alarm ($25 penalty) $ 136.00 No Collected By: $ 136.00 Fifth & subsequent false $ 161.00 No Finance Full Cost: 184.29$ $ 161.00 alarms ($50 penalty)
False Alarm Calls Charged By: Date: 5/8/2018 Objective: Recover Cost Dispatch for a Holdup Alarm $ 121.00 No Police Penalty $ 121.00 In addition to R. No.: 1735
false alarm fees Collected By: R. Date: 6/1/1999 Prop 26 Exception: 1,2,5 Finance
Full Cost: 144.88$
Fingerprinting Charged By: Date: 4/19/2022 Objective: Recover Cost Does not include mandated LiveScan $ 63.67 No Police $ 66.00 3.7%
(Sent to Department of Justice) per roll R. No.: 22-9081 Prop 26 Exception: 1,2 per roll Collected By: R. Date: 4/19/2022
Police
Full Cost: 66.60$
Fingerprinting Charged By: Date: 4/19/2022 Objective: Recover Cost Hard Card $ 63.67 No Police $ 66.00 3.7%
(Person takes card with them) per card R. No.: 22-9081 Prop 26 Exception: 1,2 per card Collected By: R. Date: 4/19/2022
Police
Full Cost: 66.60$
FBI/DOJ Live Scan fees.
(Regulatory Fee)
(Regulatory Fee)
FBI/DOJ Live Scan fees.

Does not include mandated
(Regulatory Fee)
(Regulatory Fee)
Reference: CMD 109 10 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
ID Card Renewal Charged By: Date: 4/19/2022 Objective: Recover Cost (for multiple applicants) $ 95.50 No Police $ 99.00 3.7% R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Other:

Full Cost: 99.90$
Massage Establishment $ 760.10 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 795.00 4.6% Application Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 1,438.65$
Massage Establishment $ 154.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 161.00 4.5% Application - Sole Proprietor Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 1,044.01$
Massage Establishment Renewal Charged By: Date: 4/19/2022 Objective: Recover Cost Police
$ 610.50 No R. No.: 22-9081 Prop 26 Exception: 3 $ 638.00 4.5% Collected By: R. Date: 4/19/2022
Police Full Cost: 1,238.84$
DOJ/FBI Live Scan fees.
(Regulatory Fee)
Does not include mandated
(Regulatory Fee)
Reference: CMD 109 10 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Massage Establishment Renewal $ 107.80 Charged By: Date: 4/19/2022 Objective: Recover Cost $ 112.00 3.9% Sole Proprietor Police
No R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 894.15$
Massage Establishment $ 49.50 Charged By: Date: 4/19/2022 Objective: Recover Cost $ 51.00 3.0% Permit Amendments Police
No R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 99.90$
Motor Funeral Escort Company $ 334.25 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 349.00 4.4% Initial Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 349.66$
Motor Funeral Escort Company $ 143.25 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 149.00 4.0% Renewal Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 149.85$
Does not include mandated
DOJ/FBI Live Scan fees.

Reference: CMD 109 10 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Motor Funeral Escort Driver $ 143.25 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 149.00 4.0% Initial Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 149.85$
Motor Funeral Escort Driver $ 143.25 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 149.00 4.0% Renewal Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 149.85$
Off-duty employment: Per current salary No Charged By: Date: 6/6/2006 Objective: Recover Cost Per current salary schedule plus Police schedule plus
benefits and current O. No.: Prop 26 Exception: N/A benefits and current citywide overhead Collected By: O. Date: citywide overhead Finance
Full Cost: As calculated
Reference: CMD 109 10 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Pawn/Secondhand Dealer $ 143.25 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 149.00 4.0% - Registration Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 149.85$
Pawn/Secondhand Dealer Charged By: Date: 4/19/2022 Objective: Recover Cost (Regulatory Fee) - Renewal $ 95.50 No Police $ 99.00 3.7%
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 99.90$
Photo CD's $ 3.00 No Charged By: Date: 6/10/2008 Objective: Recover Cost $ 3.00 per CD Police per CD
Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:

Police Full Cost: 3.14$
Police Reports $ 0.20 No Charged By: Date: 6/10/2008 Objective: Recover Cost $ 0.20 per page Police per page
Res. No.: 08-7525 Prop 26 Exception: 1,2
Per page Collected By:

Police Full Cost: 0.21$
Per Public Records Act
DOJ/FBI Live Scan fees.
(Regulatory Fee)
Does not include mandated
PRA - no labor fee
Reference: CMD 109 10 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Private Security - Registration $ 191.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 199.00 4.2% Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 199.81$
Private Security - Renewal $ 95.50 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 99.00 3.7% Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 99.90$
Public Entertainment Application Charged By: Date: 4/19/2022 Objective: Recover Cost $ 221.25 No Police $ 231.00 4.4%
O. No.: 22-9081 Prop 26 Exception: 3
Collected By: O. Date: 4/19/2022
Police Full Cost: 231.45$
Public Entertainment Application Charged By: Date: 4/19/2022 Objective: Recover Cost Renewal $ 173.50 No Police $ 181.00 4.3%
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 181.50$
(Regulatory Fee)
Does not include mandated
DOJ/FBI Live Scan fees.

Reference: CMD 109 10 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Public Entertainment General Charged By: Date: Objective: Penalty Police
Fines for Violation (Infraction): O. No.: 1748 Prop 26 Exception: 5 1st Offense $ 150.00 No Collected By: O. Date: 2/15/2000 $ 150.00 Police Full Cost: 150.00$
Public Entertainment General Charged By: Date: 4/19/2022 Objective: Penalty Police
Fines for Violation (Infraction): O. No.: 22-9081 Prop 26 Exception: 5 2nd Offense $ 300.00 No Collected By: O. Date: 4/19/2022 $ 300.00 Police Full Cost: 300.00$
Public Entertainment General Charged By: Date: 4/19/2022 Objective: Penalty Police
Fines for Violation (Infraction): O. No.: 22-9081 Prop 26 Exception: 5 Subsequent Offenses $ 750.00 No Collected By: O. Date: 4/19/2022 $ 750.00 Police Full Cost: 750.00$
Release of Stored Vehicles $ 95.83 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 100.00 4.3% Police
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Police Full Cost: 100.25$
(Regulatory Fee)
Reference: CMD 109 10 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Repo Fee $ 15.00 No Charged By: Date: 4/28/2020 Objective: Recover Cost $ 15.00 Police
(Repossessed Vehicles) Government Code Prop 26 Exception: 1,2 Collected By: Section: 41612
Police Full Cost: 50.04$
Residential Parking Permit / Guest $ 31.83 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 31.83 Parking Permit (each) Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 33.30$
Second Response Ordinance Per current salary No Charged By: Date: 8/22/1990 Objective: Recover Cost Per current salary schedule plus Police schedule plus
benefits and current O. No.: 1849 Prop 26 Exception: 3 benefits and current citywide overhead Collected By: O. Date: 11/24/2009 citywide overhead Finance Code Section 9.05.020
Full Cost: As calculated
Solicitor / Peddler Application Charged By: Date: 4/19/2022 Objective: Recover Cost Police
Background Investigation $ 334.25 No R. No.: 22-9081 Prop 26 Exception: 3 $ 349.00 4.4% Collected By: R. Date: 4/19/2022
Police Full Cost: 349.66$
DOJ/FBI Live Scan fees.
(Regulatory Fee)
(Regulatory Fee)
Does not include mandated
(Regulatory Fee)
Mandated by State Law.

Reference: CMD 109 10 - 12 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Solicitor / Peddler Renewal $ 143.25 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 149.00 4.0% Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 149.85$
Solicitor/Peddler Application - Charged By: Date: 4/19/2022 Objective: Recover Cost Employee Only Police
$ 143.25 No R. No.: 22-9081 Prop 26 Exception: 3 $ 149.00 4.0% Collected By: R. Date: 4/19/2022
Police Full Cost: 149.85$
Taxicab/Pedicab Company $ 6,780.50 Charged By: Date: 4/19/2022 Objective: Recover Cost Does not include mandated $ 7,093.00 4.6% Application No Police
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police
Full Cost: 7,093.08$
Taxicab/Pedicab Company No Charged By: Date: 4/19/2022 Objective: Recover Cost Renewal Police
$ 716.25 R. No.: 22-9081 Prop 26 Exception: 3 Total cost of five-year permit $ 749.00 4.6% (per year) Collected By: R. Date: 4/19/2022 is $3,746. Fee is annualized. (per year) total fee is collected Police total fee is collected
over 5-year period Full Cost: 3,746.35$ over 5-year period (Regulatory Fee)
DOJ/FBI Live Scan fees.

Reference: CMD 109 10 - 13 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Taxicab/Pedicab Driver Charged By: Date: 4/19/2022 Objective: Recover Cost Does not include mandated Application $ 143.25 No Police $ 149.00 4.0%
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police
Full Cost: 149.85$
Taxicab/Pedicab Driver Charged By: Date: 4/19/2022 Objective: Recover Cost Renewal, Retest or $ 143.25 No Police $ 149.00 4.0%
Reinspection R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 149.85$
Taxicabs/Pedicab Charged By: Date: 4/19/2022 Objective: Recover Cost Annual Safety Inspection Fee $ 191.00 No Police $ 199.00 4.2% R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police Full Cost: 199.81$
DOJ/FBI Live Scan fees.
(Regulatory Fee)
(Regulatory Fee)
(Regulatory Fee)
Reference: CMD 109 10 - 14 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

CURRENT
FEE
and
PERIOD

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR
Tow Drivers Charged By: Date: 4/19/2022 Objective: Recover Cost Does not include mandated Application $ 143.25 No Police $ 149.00 4.0%
R. No.: 22-9081 Prop 26 Exception: 3
Collected By: R. Date: 4/19/2022
Police (Regulatory Fee)
Full Cost: 149.85$
USB Drive for Police Reports Charged By: Date: 7/16/2019 Objective: Recover Cost Police
$ 8.00 No R. No.: Prop 26 Exception: 2 $ 8.00
Collected By: R. Date:

Police Full Cost: 8.37$
DOJ/FBI Live Scan fees.

Reference: CMD 109 10 - 15 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE / SVACA RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 Change

ANIMAL CONTROL
LICENSE FEES For owners who are 65 years
Dog License Fees Charged By: Date: 3/27/2019 Objective: Recover Cost of age or older, there is no Altered One Year $ 25.00 No Silicon Valley User Fee license fee charged for the $ 25.00 Altered Two Years $ 37.00 No Animal Control Res. No. Penalty first animal. Fees will apply $ 37.00 Altered Three Years $ 50.00 No Authority SVACA 2019-2 to the second and additional $ 50.00 Unaltered One Year $ 100.00 No Collected By: Res. Date: Prop 26 Exception: 3 animals for such owners. $ 100.00 Silicon Valley 3/27/2019
Cat License Fees Animal Control Full Cost: N/A State law requires that dogs Altered One Year $ 15.00 No Authority must be licensed by the age $ 15.00 Altered Two Years $ 23.00 No of (4) four months. $ 23.00 Altered Three Years $ 30.00 No $ 30.00
Unaltered One Year $ 50.00 No Failure to license a dog by $ 50.00 the age of (4) four months,
Other License Fees or within 30 days of
Replacement Tag $ 5.00 No acquisition or within 30 days $ 5.00 Late (Delinquent) Fee - Licensing $ 35.00 No of residency (for a new $ 35.00 resident) or within 30 days of
Courtesy Fee $ 2.00 No Charged By: Date: 3/27/2019 Fee collected to offset the cost of the expiration date of a $ 2.00 Silicon Valley expenses for a new web based previously issued license will Animal Control Res. No. licensing program. The program be subject to the Authority SVACA 2019-2 simplifies the licensing process for Late (Delinquent) Fee.

Collected By: Res. Date: animal owners and increases staff Silicon Valley 3/27/2019 efficiency. Service is optional. Dog licenses are not Animal Control Owners may still renew or license in transferable from one owner Authority person or by mail. to the next.

FULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD
Reference: CMD 109 10 - 16 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE / SVACA RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 ChangeFULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

SHELTER SERVICES
Impound/Redemption Fees Charged By: Date: 3/27/2019 Objective: Recover Cost Includes animals Dogs and Cats Silicon Valley Penalty impounded for rabies Altered-1st Offense $ 35.00 No Animal Control Res. No. quarantine. $ 35.00 Unaltered-1st Offense $ 100.00 No Authority SVACA 2019-2 Prop 26 Exception: 3 Offenses accumulate $ 100.00 Altered or Unaltered-2nd Offense $ 125.00 No Collected By: Res. Date: through the life of the $ 125.00 Altered or Unaltered-3rd Offense $ 175.00 No Silicon Valley 3/27/2019 Full Cost: N/A animal. $ 175.00 Altered or Unaltered-4th Offense $ 205.00 No Animal Control $ 205.00 Authority
Other Domestic/Exotic
Large animal (horse, pig, etc.) $ 75.00 No $ 75.00
Small Animal (bird, rabbit, etc.) $ 28.00 No $ 28.00
Boarding Fees
per day or portion thereof:

Dogs and Cats $ 22.00 No $ 22.00
All Other Animals $ 11.00 No $ 11.00

ADOPTION FEES
Type of Animal Charged By: Date: 3/27/2019 Objective: Recover Cost SVACA reserves the right Dog $ 150.00 No Silicon Valley User Fee to deny adoptions in $ 150.00 Cat $ 100.00 No Animal Control Res. No. certain circumstances for $ 100.00 Kitten (less than six months) $ 150.00 No Authority SVACA 2019-2 Prop 26 Exception: 3 cause. $ 150.00 Rabbit $ 30.00 No Collected By: Res. Date: $ 30.00
Small Animal $ 20.00 No Silicon Valley 3/27/2019 Full Cost: N/A $ 20.00 Bird $ 20.00 No Animal Control $ 20.00
Dog Behavior Training Deposit $ 100.00 No Authority $ 100.00 Reference: CMD 109 10 - 17 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

POLICE / SVACA RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE PROPOSED NEW
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE OR REVISED FEE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS 2023-24 ChangeFULL COST FACTOR

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

ANIMAL SURRENDER FEES
Dog/Cat $ 150.00 No Charged By: Date: 3/27/2019 Objective: Recover Cost $ 150.00 Other $ 40.00 No Silicon Valley User Fee $ 40.00 Animal Control
Authority Res. No. Prop 26 Exception: 3
SVACA 2019-2
Collected By: Res. Date: Full Cost: N/A
Disposal Silicon Valley 3/27/2019
Small Animals $ 25.00 No Animal Control $ 25.00 Dog/Cat/Rabbit $ 50.00 No Authority $ 50.00 Dogs and others over 150 lbs. $ 125.00 No $ 125.00

TRAP FEES
No Daily Fees Charged By: Date: 3/27/2019 Objective: Recover Cost Maximum rental period on Refundable Deposit $ 100.00 No Silicon Valley User Fee all traps is 2 weeks, unless $ 100.00 Animal Control Res. No. extended by SVACA staff.

Authority SVACA 2019-2 Prop 26 Exception: 3
Collected By: Res. Date:

Silicon Valley 3/27/2019 Full Cost: N/A
Animal Control
Authority

OTHER FEES
Animal Establishment Fee $ 200.00 No Charged By: Date: 3/27/2019 Objective: Recover Cost $ 200.00 Animal Rescue Registration $ 25.00 No Silicon Valley User Fee $ 25.00 Keeping of Animal or Fowl Permit $ 50.00 No Animal Control Res. No. Penalty $ 50.00 Dangerous Dog Fee $ 200.00 No Authority SVACA 2019-2 $ 200.00 Field Service Charge, per trip $ 50.00 No Collected By: Res. Date: Prop 26 Exception: 3 $ 50.00 Home Quarantine Fee $ 50.00 No Silicon Valley 3/27/2019 $ 50.00 Returned Check Charge $ 50.00 No Animal Control Full Cost: N/A $ 50.00 Lab Processing Fee $ 100.00 No Authority $ 100.00 Volunteer Materials Fee $ 35.00 No $ 35.00 Records Request Fee $ 0.20/page No $ 0.20/page
Reference: CMD 109 10 - 18 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
Public Works

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2,3,6
LPD R. No.: 22-9081
Parcel Map and Record of $ 7,993.30 R. Date: 4/19/2022 Full Cost: 8,361.80$ $ 8,361.00 4.6% Survey Checking Fee (includes 3 checks) per map
Parcel Map and Record of Survey Checking $ 1,406.06 Collected By: Full Cost: 1,470.88$ $ 1,470.00 4.5% Fee (4th and subsequent reviews) Finance
Objective: Recover Cost
Yes Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2,3,6 Engineering/
Final Map Checking Fee - First 5 Lots $ 10,171.71 LPD R. No.: 22-9081 Full Cost: 10,640.63$ $ 10,640.00 4.6% (includes 3 checks) Yes R. Date: 4/19/2022
Collected By:

Final Map Checking Fee - First 5 Lots $ 1,406.06 Finance 1,470.88$ $ 1,470.00 4.5% (4th and subsequent reviews)
Final Map Checking Fee per lot beyond 5 lots $ 462.71 484.04$ $ 484.00 4.6% (includes 3 checks)
Final Map Checking Fee per lot beyond 5 lots $ 462.71 484.04$ $ 484.00 4.6% (4th and subsequent reviews)
Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2,3,6
Amended Parcel Map and $ 3,337.85 LPD R. No.: 22-9081 Full Cost: 3,491.72$ $ 3,491.00 4.6% Record of Survey Checking per map R. Date: 4/19/2022 per map Fee (includes 2 checks)
Collected By:

Amended Parcel Map and Record of $ 1,034.14 Finance Full Cost: 1,081.81$ $ 1,081.00 4.5% Survey Checking fee (For the 3rd and
subsequent reviews)

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
per map
Reference: CMD 109 11 - 1 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2,3,6
LPD R. No.: 22-9081
Amended Final Map $ 3,337.85 R. Date: 4/19/2022 Full Cost: 3,491.72$ $ 3,491.00 4.6% Checking Fee (includes 2 checks) per map per map
Amended Final Map Checking Fee (For the $ 1,034.14 Collected By: Full Cost: 1,081.81$ $ 1,081.00 4.5% 3rd and subsequent reviews) Finance
Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2,3,6
LPD R. No.: 22-9081
Processing Certificate of $ 3,735.34 R. Date: 4/19/2022 Full Cost: 3,907.54$ $ 3,907.00 4.6% Correction (includes 2 checks) per map per map
Processing Certificate of Correction (For the $ 1,215.51 Collected By: Full Cost: 1,271.55$ $ 1,271.00 4.6% 3rd and subsequent reviews) Finance
(for Final/Parcel Maps.)
Assessment District Charged By: Date: 4/19/2022 Objective: Recover Cost Reapportionment Fee - Engineering/
Assemblage/Parcel Split LPD R. No.: 22-9081 Prop 26 Exception: 1,2,3,6 R. Date: 4/19/2022
First two Parcels $ 8,804.00 No Collected By: Full Cost: 9,209.86$ $ 9,209.00 4.6% Finance
Each Subsequent Parcel $ 2,238.00 No Full Cost: 2,341.17$ $ 2,341.00 4.6% Charged By: Date: 4/19/2022 Objective: Recover Cost
Engineering/ Prop 26 Exception: 1,2,3,6
No LPD R. No.: 22-9081
Processing Certificate of $ 1,695.33 R. Date: 4/19/2022 Full Cost: 1,773.48$ $ 1,773.00 4.6% Compliance (includes 2 checks) per certificate Collected By: per certificate Finance
Processing Certificate of Compliance $ 961.45 Full Cost: 1,005.78$ $ 1,005.00 4.5% (For the 3rd and subsequent reviews)
Reference: CMD 109 11 - 2 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2,3,6
LPD R. No.: 22-9081
Lot Line Adjustment $ 7,275.39 R. Date: 4/19/2022 Full Cost: 7,610.79$ $ 7,610.00 4.6% Processing (includes 3 checks) per application Collected By: per application Finance
Lot Line Adjustment Processing $ 1,215.51 Full Cost: 1,271.55$ $ 1,271.00 4.6% (For the 4th and subsequent reviews)
Security Deposit for Survey Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan Property Monument $ 1,770.60 No Engineering/ change in CCI $ 1,918.00 8.3% per monument LPD R. No.: 22-9081 Prop 26 Exception: 1,2,3,6 R. Date: 4/19/2022 See note 1
Minimum Security Deposit $ 3,541.20 No Collected By: Full Cost: 1,918.00$ $ 3,837.00 8.4% minimum Finance Full Cost: 3,837.00$ minimum
per map per map
Security Deposit for Survey Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan City Standard Street $ 2,360.80 No Engineering/ change in CCI $ 2,558.00 8.4% Monuments per monument LPD R. No.: 22-9081 Prop 26 Exception: 1,2 R. Date: 4/19/2022 See note 1
Minimum Security Deposit $ 3,541.20 No Collected By: Full Cost: 2,558.00$ $ 3,837.00 8.4% minimum Finance Full Cost: 3,837.00$ minimum
per map per map
Encroachment Permit: Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2,3
Processing Fee LPD R. No.: 22-9081
for Project up to $25K $ 390.00 Yes R. Date: 4/19/2022 Full Cost: 407.98$ $ 407.00 4.4% per permit Collected By: per permit
Finance
for Project over $25K $ 780.00 Yes Full Cost: 815.96$ $ 815.00 4.5% per permit per permit
Permit Extension for all Projects $ 435.50 Yes Full Cost: 455.58$ $ 455.00 4.5% per permit only applies to extensions per permit
for all projects
per monument
per monument
Reference: CMD 109 11 - 3 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Encroachment Permit: Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2,3
Engineering Plan Check for Projects up to $25K LPD R. No.: 22-9081 (per plan set) - includes 3 checks $ 718.75 Yes R. Date: 4/19/2022 Full Cost: 751.88$ $ 751.00 4.5% Collected By:

Engineering Plan Check for Projects over $25K Finance
(per plan sheet) - includes 3 checks $ 1,726.00 Yes Full Cost: 1,805.57$ $ 1,805.00 4.6%

Engineering Plan Check (per plan set)
for Projects up to $25K - 4th and
subsequent review $ 155.50 Yes Full Cost: 162.67$ $ 162.00 4.2% Engineering Plan check (per plan sheet)
for Projects over $25K - 4th and
subsequent review $ 290.75 Yes Full Cost: 304.15$ $ 304.00 4.6% Engineering Plan Check (per plan
sheet) for Projects over $25K for
revisions after EP issuance $ 483.00 Yes Full Cost: 505.27$ $ 505.00 4.6% Encroachment Permit:

Engineering Inspection
$0-$15K $ 468.00 Yes Full Cost: 489.57$ $ 489.00 4.5% $15,001-$25K-base + 14.50% of cost above $15K $ 468.00 Yes Full Cost: 489.57$ $ 489.00 4.5% $25,001-$50K-base + 13.42% of cost above $25K $ 1,917.60 Yes Full Cost: 2,006.00$ $ 2,006.00 4.6% $50,001-$100K-base + 2.88% of cost above $50K $ 5,273.40 Yes Full Cost: 5,516.50$ $ 5,516.00 4.6% $101K-$200K-base + 5.75% of cost above $100K $ 6,711.60 Yes Full Cost: 7,021.00$ $ 7,021.00 4.6% $201K-$500K-base + 5.27% of cost above $200K $ 12,464.40 Yes Full Cost: 13,039.01$ $ 13,039.00 4.6% $501K-$1M-base + 4.99% of cost above $500K $ 28,284.60 Yes Full Cost: 29,588.52$ $ 29,588.00 4.6% >$1M; base $ 53,213.40 Yes Full Cost: 55,666.54$ $ 55,666.00 4.6% >$1M for each additional $500K or fraction thereof $ 13,423.20 Yes Full Cost: 14,042.01$ $ 14,042.00 4.6% Encroachment Permit: $ 2.31 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan $ 2.51 8.4% Slurry Seal Fee per square ft, or Engineering/ change in CCI per square ft, or LPD R. No.: 22-9081 Prop 26 Exception: 1,2,3
$ 106.24 Yes R. Date: 4/19/2022 See note 1 $ 115.00 8.2% minimum Collected By: Full Cost: 115.13$ minimum Finance
Reference: CMD 109 11 - 4 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Encroachment Permit: Charged By: Date: 4/19/2022 Objective: Recover Cost Field Marking-Storm Drain Engineering/ Prop 26 Exception: 1,2,3 Up to 50 ft. of excavation $ 175.50 Yes LPD R. No.: 22-9081 Full Cost: 183.59$ See Article 2 of Chapter 3.1 $ 183.00 4.3% R. Date: 4/19/2022 of Div. 5 of Title 1 of the
Over 50 ft. of excavation $ 175.50 Yes Collected By: Full Cost: 183.59$ Government Code. $ 183.00 4.3% plus Finance plus plus
$ 117.00 Yes Full Cost: 122.39$ $ 122.00 4.3% Each additional Each additional
50 ft or fraction 50 ft or fraction
thereof thereof
Encroachment Permit: Charged By: Date: 4/19/2022 Objective: Recover Cost Field Marking-Traffic Signal Engineering/LPD Prop 26 Exception: 2 See note 2 Up to 50 ft. of excavation $ 132.75 Yes R. No.: 22-9081 Full Cost: 138.87$ $ 138.00 4.0% R. Date: 4/19/2022
Over 50 ft. of excavation $ 132.75 Yes Collected By: Full Cost: 138.87$ $ 138.00 4.0% plus Finance plus
$ 88.50 Yes Full Cost: 92.58$ $ 92.00 4.0% Each additional Each additional
50 ft or fraction 50 ft or fraction
thereof thereof
Copy of $ 0.20 No Charged By: Date: 6/9/2009 Objective: Recover Cost Citywide rate for $ 0.20 Design Criteria per page Engineering/ copying plus sales tax. per page for public LPD Res. No. 09-7631 Prop 26 Exception: 1,2 for public Standard Details $ 0.05 No $ 0.05
per page Collected By: Full Cost: Cost per page
Standard Specifications for employees Finance for employees Subdivision Code
Property Development
Ordinance
Black Line Print of Plans $ Actual Cost No Charged By: Date: 6/9/2009 Objective: Recover Cost Actual cost of duplication. $ Actual Cost on file Engineering
Res. No. 09-7631 Prop 26 Exception: 1,2
Collected By: Full Cost: Cost
Reference: CMD 109 11 - 5 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Record Drawings $ 82.33 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 86.00 4.5% Archiving Fee per sheet Engineering/ per sheet
LPD R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: 86.13$
Watershed Map $ Actual Cost No Charged By: Date: 6/9/2009 Objective: Recover Cost Actual cost of duplication. $ Actual Cost Engineering/
LPD Res. No. 09-7631 Prop 26 Exception: 1,2
Collected By: Full Cost: Cost
Encroachment Agreement $ 4,982.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 5,212.00 4.6% Application per application Engineering/ per application LPD R. No.: 22-9081 Prop 26 Exception: 1,2,3
Into Easements R. Date: 4/19/2022
Full Cost: 5,212.19$
Collected By:

Encroachment Agreement $ 5,436.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 5,686.00 4.6% Application per application Engineering/ per application LPD R. No.: 22-9081 Prop 26 Exception: 1,2,3
Into Rights-of-Way R. Date: 4/19/2022
Full Cost: 5,686.60$
Reference: CMD 109 11 - 6 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Objective: Recover Cost
Yes Charged By: Date: 4/19/2022 Prop 26 Exception: 1,2
Preparation of Agreement/ $ 5,416.49 Engineering/ Full Cost: 5,666.19$ $ 5,666.00 4.6% Easement/Grant Deed (includes 2 checks) per document LPD R. No.: 22-9081 per document Yes R. Date: 4/19/2022
Preparation of Agreement/ $ 1,215.50 Collected By: Full Cost: 1,271.54$ $ 1,271.00 4.6% Easement/Grant Deed For 3rd and Finance For 3rd and
(for the 3rd and subsequent review) subsequent review subsequent review Preparation of Minor Agreement/ $ 4,255.94 Full Cost: 4,452.14$ $ 4,452.00 4.6% Easement/Grant Deed (includes 2 checks) per document per document Preparation of Minor Agreement/ $ 1,215.51 Full Cost: 1,271.55$ $ 1,271.00 4.6% Easement/Grant Deed For 3rd and
(for the 3rd and subsequent review) subsequent review
Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2
Combination Agreement/ $ 7,152.03 LPD R. No.: 22-9081 Full Cost: 7,481.74$ $ 7,481.00 4.6% Grant Deed for the same lot both documents R. Date: 4/19/2022 both documents (includes two checks)
Combination Agreement/Grant Deed for the same
lot $ 1,215.51 Full Cost: 1,271.55$ $ 1,271.00 4.6% (For the 3rd and subsequent review)
Collected By:

Finance
Document Recordation Fee $ Actual Cost No Charged By: Date: Objective: Recover Cost Fee to recover direct costs for $ Actual Cost Engineering/ recording documents at the
LPD Prop 26 Exception: 1,2 County Recorder.

Collected By: Res. No. 08-7527 Full Cost: Cost
Finance Res. Dat 6/10/2008
Reference: CMD 109 11 - 7 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Engineering/ Prop 26 Exception: 1,2
Review of Agreements & $ 4,482.00 LPD R. No.: 22-9081 Full Cost: 4,688.62$ $ 4,688.00 4.6% Easements per document Yes R. Date: 4/19/2022 per document Collected By:

Review of Minor Agreements & $ 2,743.00 Finance Full Cost: 2,869.45$ $ 2,869.00 4.6% Easements per document per document
Outside 3rd Party Review or Inspection of $ Actual Cost No Charged By: Date: Objective: Recover Cost $ Actual Cost Items within public ROW or City Easements with Initial Deposit Engineering/ with Initial Deposit LPD R. No.: Prop 26 Exception: 1,2
R. Date:

Collected By: Full Cost: Cost
Finance
Overtime Plan Check, Mapping Review, etc. $ Actual Cost No Charged By: Date: Objective: Recover Cost $ Actual Cost with Initial Deposit Engineering/ with Initial Deposit
LPD R. No.: Prop 26 Exception: 1,2
R. Date:

Collected By: Full Cost: Cost
Finance
Outside 3rd Party Review for Survey $ Actual Cost No Charged By: Date: Objective: Recover Cost $ Actual Cost or Mapping with Initial Deposit Engineering/ with Initial Deposit LPD R. No.: Prop 26 Exception: 1,2
R. Date:

Collected By: Full Cost: Cost
Finance
Reference: CMD 109 11 - 8 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Storm Drain Outlet Charge $ 8,200.24 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan $ 8,886.60 8.4% per acre Engineering/ change in CCI per acre
LPD R. No.: 22-9081 Prop 26 Exception: 6
R. Date: 4/19/2022 See note 1
Collected By:

Finance Full Cost: 8,886.60$
Storm Outlet $ 8,200.24 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan $ 8,886.60 8.4% Charge per acre Engineering/ change in CCI per acre
Institutional LPD R. No.: 22-9081 Prop 26 Exception: 6
$ 2,717.28 Yes R. Date: 4/19/2022 See note 1 $ 2,944.71 8.4% (allowed under certain per acre Collected By: Full Cost: varies per acre conditions) Finance
Sanitary Sewer Outlet $ 481.60 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan $ 521.91 8.4% Charge per unit Engineering/ change in CCI per unit
Residential-Single Family LPD R. No.: 22-9081 Prop 26 Exception: 6 $ 1,810.74 Yes R. Date: 4/19/2022 See note 1 $ 1,962.30 8.4% (choose the greatest and per lot Collected By: Full Cost: varies per lot add Conveyance Fee) Finance
$ 8,200.24 Yes $ 8,886.60 8.4%
per acre per acre
Sanitary Sewer Outlet $ 676.96 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan $ 733.62 8.4% Charge per lot Engineering/ change in CCI per lot
Trailer Parks & Mobile Homes LPD R. No.: 22-9081 Prop 26 Exception: 6 $ 8,200.24 Yes R. Date: 4/19/2022 See note 1 $ 8,886.60 8.4% (choose the greatest and per acre Collected By: Full Cost: varies per acre add Conveyance Fee) Finance
Reference: CMD 109 11 - 9 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Sanitary Sewer Outlet $ 481.60 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan $ 521.91 8.4% Charge per unit Engineering/ change in CCI per unit
Condo & Planned Unit LPD R. No.: 22-9081 Prop 26 Exception: 6 Development $ 8,200.24 Yes R. Date: 4/19/2022 See note 1 $ 8,886.60 8.4% (choose the greatest and per acre Collected By: Full Cost: varies per acre add Conveyance Fee) Finance
Sanitary Sewer Outlet $ 1,810.74 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan $ 1,962.30 8.4% Charge per lot Engineering/ change in CCI per lot
Commercial & Industrial LPD R. No.: 22-9081 Prop 26 Exception: 6 $ 8,200.24 Yes R. Date: 4/19/2022 See note 1 $ 8,886.60 8.4% (choose the greatest and per acre Collected By: Full Cost: varies per acre add Conveyance Fee) Finance
Sanitary Sewer Outlet Charged By: Date: 5/8/2018 Objective: Recover Cost Charge - Conveyance Fee $ 4,218.00 No Engineering/ $ 4,218.00 Residential per dwelling unit LPD R. No.: 10-7741 Prop 26 Exception: 6 per dwelling unit R. Date: 6/15/2010
Collected By:

Finance Full Cost: 4,850.00$
Accessory Dwelling Unit* $ 2,653.00 No O. No.: 1968 Full Cost: 3,050.65$ * See note 3 for accessory $ 2,653.00 O. Date: 8/22/2017 dwelling unit rate justification.

Sanitary Sewer Outlet Charged By: Date: 6/15/2010 Objective: Recover Cost Charge - Conveyance Fee $ 8.60 No Engineering/ $ 8.60
Non-residential per gallon LPD R. No.: 10-7741 Prop 26 Exception: 6 per gallon per day R. Date: 6/15/2010 per day
Collected By: Full Cost: 8.65$
Finance
Reference: CMD 109 11 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Sanitary Sewer Capacity $ 9,109.32 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 9,529.00 4.6% Model Run Fee for initial run Engineering/ for initial run LPD R. No.: 22-9081 Prop 26 Exception: 6
time & material R. Date: 4/19/2022 time & material
for subsequent Collected By: for subsequent
model run Finance Full Cost: 9,529.26$ model run Existing Improvements Charged By: Date: 4/19/2022 Objective: Recover Cost A. Street Improvements Engineering/ Adjust by Jan - Jan Residential $ 115.20 No LPD R. No.: 22-9081 Prop 26 Exception: 6 change in CCI $ 124.85 8.4% Commercial $ 244.34 No R. Date: 4/19/2022 $ 264.80 8.4% Industrial $ 175.88 No Collected By: $ 190.60 8.4%
per front foot Finance Full Cost: varies per front foot Existing Improvement Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan B. Street Curbing $ 42.02 No Engineering/ change in CCI $ 45.54 8.4% per front foot LPD R. No.: 22-9081 Prop 26 Exception: 6 R. Date: 4/19/2022
Collected By: See note 1
Finance Full Cost: 45.54$

Existing Improvement Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan Engineering/ change in CCI
C. Sidewalk Improvements $ 16.76 No LPD R. No.: 22-9081 Prop 26 Exception: 6 $ 18.17 8.4% per square foot R. Date: 4/19/2022 per square foot
Collected By: See note 1
Finance Full Cost: 18.17$

per front foot
Reference: CMD 109 11 - 11 Form: FEEFORM Revised: May 2011 See note 1

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Existing Improvement (cont'd) Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan Engineering/ change in CCI
D. Street Name Signs $ 0.29 No LPD R. No.: 22-9081 Prop 26 Exception: 6 $ 0.31 8.4% per front foot R. Date: 4/19/2022 per front foot
Collected By: See note 1
Finance Full Cost: 0.31$
Existing Improvement (cont'd) Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan E. Sanitary Sewers $ 41.90 No Engineering/ change in CCI $ 45.41 8.4% per front foot LPD R. No.: 22-9081 Prop 26 Exception: 6 R. Date: 4/19/2022
Collected By: See note 1
Finance Full Cost: 45.41$
Existing Improvement (cont'd) Charged By: Date: 4/19/2022 Objective: Recover Cost Adjust by Jan - Jan F. Storm Drains $ 41.90 No Engineering/ change in CCI $ 45.41 8.4% per front foot LPD R. No.: 22-9081 Prop 26 Exception: 6 R. Date: 4/19/2022
Collected By: See note 1
Finance Full Cost: 45.41$
Existing Improvement (cont'd) $ Use original No Charged By: Date: 6/29/1989 Objective: Recover Cost Original cost paid by the City $ Use original G. Right-of-way and/or cost per square Engineering/ will be charged. cost per square Easements foot LPD R. No.: Prop 26 Exception: 6 foot
R. Date: Each case is unique and will
Collected By: require research for its original
Finance Full Cost: Cost cost.
per front foot
per front foot
Reference: CMD 109 11 - 12 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Recreation Tax (Bedroom) - Charged By: Date: 8/5/1969 Objective: User Fee See SCCC 3.15.020 New Construction-Permit Engineering/
First Bedroom $ 15.00 No LPD O. No.: 1216 Prop 26 Exception: 6 $ 15.00 O. Date: 8/5/1969
Each additional $ 5.00 No Collected By: $ 5.00
per bedroom Finance Full Cost: 15.69$ per bedroom Recreation Tax (Bedroom) - Charged By: Date: 8/5/1969 Objective: User Fee See SCCC 3.15.020 Additions Engineering/
LPD O. No.: 1216 Prop 26 Exception: 6
Each additional $ 5.00 No O. Date: 8/5/1969 $ 5.00
per bedroom Collected By: per bedroom
Finance Full Cost: 5.23$
Traffic Impact Fee pre 10/22/18 per square foot Charged By: Date: 4/19/2022 Objective: Impact Dev. Fee Applicable to areas within the Office/R & D $ 1.17 No Engineering/ Traffic Impact Fee Area Map. $ 1.27 8.4% Industrial $ 0.79 No LPD Res. No. 22-9081 Prop 26 Exception: 6 Projects entitled before $ 0.86 8.4% Warehousing, Utilities $ 0.23 No Res. Dat 4/19/2022 October 22, 2018 will pay this $ 0.25 8.4% Communications Collected By: Traffic Impact Fee.

Hotel-Motel $ 475.70 No Finance Full Cost: Varies See Note 1 $ 515.52 8.4% per room See SCMC 17.15.330 per room
per square foot
Reference: CMD 109 11 - 13 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Traffic Impact Fee per square foot Charged By: Date: 4/19/2022 Objective: Impact Dev. Fee Applicable citywide.

Office/R & D $ 1.61 No Engineering/ Projects entitled on or after $ 1.74 8.4% Industrial $ 0.88 No LPD R. No.: 22-9081 Prop 26 Exception: 6 October 22, 2018 will pay this $ 0.96 8.4% Warehousing, Utilities $ 0.26 No R. Date: 4/19/2022 Traffic Impact Fee. $ 0.28 8.4% Communications Collected By: Retail elements with total Retail $ 5.35 No Finance Full Cost: Varies sq. ft. < 50,000 sf and any $ 5.80 8.4% Hotel-Motel $ 843.15 No affordable housing units are $ 913.73 8.4% per room exempt from paying this fee. per room
Multi-Family Residential $ 618.30 No See Note 1 $ 670.05 8.4% per dwelling unit See SCMC 17.15.330 per dwelling unit
Single-Family Residential $ 1,391.16 No $ 1,507.60 8.4% per dwelling unit per dwelling unit
Tasman East Specific Plan Area Impact Fee Charged By: Date: 4/19/2022 Objective: Impact Dev. Fee Multi-Family Residential $ 7,516.82 No Engineering/ $ 8,145.98 8.4% per dwelling unit LPD R. No.: 22-9081 Prop 26 Exception: 6 per dwelling unit R. Date: 4/19/2022 See Note 1
Collected By:

Finance Full Cost: Varies
Patrick Henry Drive Specific Plan Charged By: Date: 3/22/2022 Objective: Impact Dev. Fee Not a New Fee Infrastructure Impact Fee Engineering/ Added to fee schedule for LPD R. No.: 22-9064 Prop 26 Exception: 6 consolidation purposes.

Multi-Family Residential $ 9,626.00 No R. Date: 3/22/2022 Full Cost: 10,431.70$ $ 10,431.70 8.4% per dwelling unit Collected By: per dwelling unit See Note 1 per dwelling unit Finance O. No.: 2046
Office $ 21.00 No O. Date: 3/22/2022 Full Cost: 22.76$ $ 22.76 8.4% per square foot per square foot per square foot
per square foot
Reference: CMD 109 11 - 14 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Oversize, Overweight Charged By: Date: 6/7/2005 Objective: User Fee Statewide rate Vehicles Fee per vehicle Engineering/ per vehicle
Traffic O. No.: Prop 26 Exception: 3
Single $ 16.00 No O. Date: $ 16.00
Annual $ 90.00 No Collected By: Full Cost: 135.99$ $ 90.00 Finance
Traffic Flow Map - Mailed $ 43.33 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 45.00 3.8% each Engineering/ each
Traffic R. No.: 22-9081 Prop 26 Exception: 1,2
Traffic Flow Map - Not $ 21.67 No R. Date: 4/19/2022 $ 22.00 1.5% Mailed each Collected By: Full Cost: 45.33$ each Finance Full Cost: 22.67$
Storage or Refuse Bins on City Street $ 151.00 No Charged By: Date: 6/22/2021 Objective: Recover Cost $ 157.00 4.0% each Engineering/
Traffic R. No.: 21-8981 Prop 26 Exception: 1,2
R. Date: 6/22/2021
Collected By:

Finance Full Cost: 271.99$
Temporary Sanitary Sewer Discharge $ Yes Charged By: Date: Objective: Recover Cost $ 1,421.00 new Engineering/
LPD R. No.: Prop 26 Exception: 1,2
R. Date:

Collected By:

Finance Full Cost: 1,421.00$
Reference: CMD 109 11 - 15 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Building Permit Site Clearance Fee Yes Charged By: Date: Objective: Recover Cost a) Minor $ Engineering/ $ 135.00 new
b) Major $ LPD R. No.: Prop 26 Exception: 1,2 $ 271.00 new R. Date:

Collected By: Full Cost: 135.50$
Finance Full Cost: 271.00$
Subdivision Committee Review: $ 1,544.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,615.00 4.6% Tentative Map (4 or fewer lots) Engineering/
LPD R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: 1,615.70$
Subdivision Committee Review: $ 2,459.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,572.00 4.6% Tentative Map (5 or more lots) Engineering/
LPD R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: 2,572.88$
Subdivision Committee Review: $ 699.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 731.00 4.5% Lot Line Adjustment Engineering/
LPD R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: 731.75$
Reference: CMD 109 11 - 16 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Project Clearance Committee Review: $ 863.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 903.00 4.6% Preliminary application/Re-Zoning/ Engineering/
Architect Review LPD R. No.: 22-9081 Prop 26 Exception: 1,2 R. Date: 4/19/2022
Collected By:

Finance Full Cost: 903.31$
Project Clearance Committee Review: $ 423.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 442.00 4.5% Use Permit/Variance Engineering/
LPD R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: 442.50$
Project Clearance Committee Review: $ 2,745.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,871.00 4.6% CEQA - Initial Study Review Engineering/
LPD R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: 2,871.54$
Project Clearance Committee Review: $ 4,533.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 4,742.00 4.6% CEQA - EIR Review Engineering/
LPD R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: 4,742.49$
Reference: CMD 109 11 - 17 Form: FEEFORM Revised: May 2011

SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE or CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

FULL COST FACTOR

CURRENT
FEE
and
PERIOD

OR REVISED FEE

PROPOSED NEW
2023-24
Project Clearance Committee Review: $ 2,772.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,899.00 4.6% Traffic Study Report Review Engineering/
(without EIR) LPD R. No.: 22-9081 Prop 26 Exception: 1,2 R. Date: 4/19/2022
Collected By:

Finance Full Cost: 2,899.79$
Cost Analysis for Development - $ 422.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 441.00 4.4% CAD - Minor (accessory dwelling unit, single Engineering/ family home, and up to 4 residential units) LPD R. No.: 22-9081 Prop 26 Exception: 1,2 R. Date: 4/19/2022
Collected By:

Finance Full Cost: 441.98$
Cost Analysis for Development - $ 1,032.25 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,079.00 4.5% CAD - Major Engineering/
LPD R. No.: 22-9081 Prop 26 Exception: 1,2
R. Date: 4/19/2022
Collected By:

Finance Full Cost: 1,079.84$
Shared Mobility Permit and Charged By: Date: 12/7/2021 Objective: Recover Cost Not a new fee.

Impound Fees Engineering Fee inadvertently excluded
R. No.: 21-9035 Prop 26 Exception: 2 from prior fee schedule. 1) Application Fee (per Operator) $ 3,470.00 Yes Collected By: R. Date: 12/7/2021 Full Cost: 3,629.97$ $ 3,629.00 4.6% 2) Annual Fee (per Operator) $ 27,430.00 Finance Full Cost: 28,694.52$ $ 28,694.00 4.6% 3) Per Device Fee (excluding the $ 70.00 Yes Full Cost: 73.23$ $ 73.00 4.3% first 60 devices)
4) Per Additional Device Fee (for $ 35.00 Full Cost: 36.61$ $ 36.00 2.9% authorized increases to the original
number of permitted devices)
5) Impound Fee (per device) $ 305.00 Full Cost: 330.53$ Adjust using Jan - Jan CCI $ 330.00 8.2% Adjust using general COL
Adjust using general COL
Adjust using general COL
Adjust using general COL
Reference: CMD 109 11 - 18 Form: FEEFORM Revised: May 2011

PUBLIC WORKS DEPARTMENT, ENGINEERING DIVISION

JUSTIFICATION FOR INCREASE IN FEES, RATES, AND CHARGES

NOTE 1: Fees, rates, and charges to recover costs for these types of fees/reimbursements for public improvements are proposed to be increased 8.37% above 2022/23 fees, rates, and charges, consistent with the percentage increase in the Construction Cost Index (January 2023) as published by the Engineering News-Record.

NOTE 2: Fees, rates, and charges to recover costs for Field Marking – Traffic Signal Engineering Services is equal to the Field Marking – Fiber which services are performed by the same Silicon Valley Power (SVP) field staff.

NOTE 3: City is required to charge a pro-rated sanitary sewer conveyance fee for accessory dwelling units per City Ordinance 1968.

An accessory dwelling unit is equivalent to an apartment and will be charged a sanitary sewer conveyance fee equivalent to 62.9% of the sanitary sewer conveyance fee for a single-family home. This 62.9% is based on the ratio of an apartment daily average discharge of 154 gallons per day (gpd) over a single-family home daily average discharge of 245 gpd (154 gpd/245 gpd = 0.629).

11 - 19
SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / STREET / STORM DRAIN DIVISION RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

1. Active construction site Charged By: Date: 4/19/2022 Objective: Recover Cost MRP requires inspection inspections of projects $ 204.00 Yes Storm Drain of sites once a month $ 615.00 201.5% over one (1) acre in size R. No.: 22-9081 Prop 26 Exception: 1,2 during wet season. and high priority sites Collected By: R. Date: 4/19/2022 7 inspections per year during wet season (Oct. - Storm Drain required if permit is open Apr.) as required by & Finance Full Cost: 615.39$ during wet season, plus Provision C.6 of MRP reinspections as needed.

2. Industrial/commercial Charged By Date: 4/19/2022 Objective: Recover Cost Inspection frequency facility stormwater $ 561.00 Yes Storm Drain of businesses that have $ 712.00 26.9% inspections as required R. No.: 22-9081 Prop 26 Exception: 1,2 filed a Notice of Intent (NOI) by Provision C.4 of Collected By R. Date: 4/19/2022 is once per year as required MRP (Tier 1) Storm Drain by the Municipal Regional
& Finance Full Cost: 712.56$ Stormwater NPDES Permit.

3. Industrial/commercial Charged By Date: 4/19/2022 Objective: Recover Cost Businesses that received facility stormwater $ 204.00 Yes Storm Drain a Notice of Violation during $ 469.00 129.9% inspections as required R. No.: 22-9081 Prop 26 Exception: 1,2 an industrial/commercial by Provision C.4 of Collected By R. Date: 4/19/2022 stormwater inspection MRP (Tier 2) Storm Drain the previous year are
& Finance Full Cost: 469.64$ required to be inspected the following year.

4. Operation & maintenance $ 204.00 Yes Charged By Date: 4/19/2022 Objective: Recover Cost Operation & maintenance inspection of stormwater Storm Drain inspections required on treatment systems installed R. No.: 22-9081 Prop 26 Exception: 1,2 annual basis to ensure on projects as required Collected By: R. Date: 4/19/2022 the stormwater treatment by Provision C.3 of MRP Storm Drain systems are properly & Finance maintained.

Tier 1: 1 - 25 Treatment Measures 204.00 Full Cost: 858.31$ $ 858.00 320.6% Tier 2: 26 - 50 Treatment Measures 204.00 Full Cost: 1,052.64$ $ 1,052.00 415.7% Tier 3: 50+ Treatment Measures 204.00 Full Cost: 1,246.97$ $ 1,246.00 510.8%

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24

PROPOSED NEW

CURRENT
PERIOD

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FEE
and

COMMENTSFULL COST FACTOR
Reference: CMD 109 11 - 20 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / STREET / STORM DRAIN DIVISION RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24

PROPOSED NEW

CURRENT
PERIOD

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FEE
and

COMMENTSFULL COST FACTOR

5. Operation & Maintenance Agreement $ 204.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 852.00 317.6% Administration of permanent stormwater treatment Storm Drain systems installed on projects as required by R. No.: 22-9081 Prop 26 Exception: 1,2 Provision C.3 of MRP R. Date: 4/19/2022
Collected By:

Storm Drain & Full Cost: 852.00$
Finance

6. Stormwater Management Planning Application $ 1,632.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,355.00 44.3% Plan review as required by Provision C.3 of MRP Engineering/ - First three (3) reviews LPD R. No.: 22-9081 Prop 26 Exception: 1,2 R. Date: 4/19/2022
Collected By:

Planning Full Cost: 2,355.00$

7. Stormwater Management Building Application $ 816.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 2,355.00 188.6% Improvement plans review for stormwater Storm Drain
management compliance with Provision C.3 R. No.: 22-9081 Prop 26 Exception: 1,2 of MRP - First three (3) reviews R. Date: 4/19/2022
Collected By:

Building Full Cost: 2,355.00$
Reference: CMD 109 11 - 21 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / STREET / STREET MAINTENANCE DIVISION RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change Pavement restoration charges
Pavement Restoration Charge Charged By: Date: 4/19/2022 Objective: Recover Cost are applied on work Up to 3" Thick Asphalt Engineering associated with utility street

1. First 80 cubic feet $ 4,075.50 Yes R. No.: 22-9081 Prop 26 Exception: 1,2 opening encroachment permits $ 4,263.00 4.6% up to 80 sq. ft. Collected By: R. Date: 4/19/2022 associated with repair of Engineering existing infrastructure, not

2. Each additional cubic foot $ 40.00 Yes & Finance Full Cost: 4,263.38$ utility trench work consisting $ 41.00 2.5% per sq. ft. of installation of new main and per sq. ft. lateral lines.

Engineering Plan Review Charged By Date: 4/19/2022 Objective: Recover Cost Fee is applicable to trench per sheet (Streets) Engineering repairs for City utilities

1. First three (3) reviews $ 168.75 Yes R. No.: 22-9081 Prop 26 Exception: 1,2 street opening permits. $ 176.00 4.3% Collected By R. Date: 4/19/2022

2. Fourth and subsequent $ 38.00 Yes Engineering $ 39.00 2.6% review & Finance Full Cost: 176.53$
Concrete Removal/Replace Charged By Date: 4/19/2022 Objective: Recover Cost Fee is applicable to trench Charge - Curb/Gutter Engineering repairs for City utilities

1. Base $ 467.00 Yes R. No.: 22-9081 Prop 26 Exception: 1,2 street opening permits. $ 611.00 30.8% Collected By: R. Date: 4/19/2022
Engineering & Completing multi-year phase-in

2. Per linear ft. $ 70.00 Yes Finance Full Cost: 611.97$ to full cost recovery $ 73.00 4.3%

PROPOSED NEW
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

COMMENTSFULL COST FACTOR

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION
and
2023-24
(SEE READER'S GUIDE)
up to 80 sq. ft.

OR REVISED FEE
Reference: CMD 109 11 - 22 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / STREET / STREET MAINTENANCE DIVISION RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change

PROPOSED NEW
PERIOD

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

COMMENTSFULL COST FACTOR

FEE DETAIL

OBJECTIVECURRENT
FEE PROP 26 EXCEPTION
and
2023-24
(SEE READER'S GUIDE) OR REVISED FEE
Concrete Removal/Replace Charged By: Date: 4/19/2022 Objective: Recover Cost Fee is applicable to trench Charge - Sidewalk Engineering repairs for City utilities

1. Base $ 326.00 Yes R. No.: 22-9081 Prop 26 Exception: 1,2 street opening permits. $ 611.00 87.4% Collected By: R. Date: 4/19/2022
Engineering & Completing multi-year phase-in

2. Per square ft. $ 19.00 Yes Finance Full Cost: 611.97$ to full cost recovery $ 19.00 Traffic Sign Fabrication $ 904.50 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Fee is for traffic sign $ 946.00 4.6% Engineering fabrication.

R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Engineering &
Finance Full Cost: 946.20$
Reference: CMD 109 11 - 23 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / STREET / PARKWAYS & BOULEVARDS RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change Street Tree Removal $ 225.00 Ye
s Charged By: Date: 6/22/2021 Objective: Recover Cost Contract Costs: $ 235.00 4.4% per hour Parkways & 1-3" dbh: $55 per hour
Boulevards R. No.: 21-8981 Prop 26 Exception: 1,2 4-6" dbh: $110 Plus contract R. Date: 6/22/2021 7-12" dbh: $220 Plus contract cost to remove Collected By: 13-24" dbh: $987.50 cost to remove tree & stump as Finance Full Cost: 235.37$ 25-36" dbh: $1,650 tree & stump as specified in the 37-48" dbh: $2,500 specified in the
Comments 49" and above dbh: $2,000 Comments
Section are Section are
added to the added to the
Fee. Fee.

Street Tree Planting $ 625.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Includes tractor, auger, $ 653.00 4.5% per tree Engineering fertilizer, compost & per tree
Property development R. No.: 22-9081 Prop 26 Exception: 1,2,6 stakes and 15 gallon tree.

Collected By: R. Date: 4/19/2022
Finance
Full Cost: 653.81$
Engineering Parkways and Charged By: Date: 4/19/2022 Objective: Recover Cost Initial Review includes up $ 524.00 210.5% Boulevards Plan Review Engineering to three (3) plan checks. per sheet - Initial Review R. No.: 22-9081 Prop 26 Exception: 2

1. First three (3) reviews $ 168.75 Yes Collected By: R. Date: 4/19/2022 Finance

2. Fourth and subsequent $ 37.50 Yes Full Cost: 524.00$ review

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PROPOSED NEW

OR REVISED FEE

FEE DETAIL

OBJECTIVE
PERIOD 2023-24FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
Reference: CMD 109 11 - 24 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

PUBLIC WORKS / STREET / SOLID WASTE RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) Change Charged By: Date: 4/19/2022 Objective: User Fee Haulers that want to charge Non-exclusive franchise $ 1,378.00 No Solid Waste for solid waste collection $ 1,441.00 4.6% hauler application fee R. No.: 22-9081 Prop 26 Exception: 2 services at properties Collected By: R. Date: 4/19/2022 zoned for Industrial use Solid Waste have agreements approved
& Finance Full Cost: 1,441.53$ by Council at a Public Hearing.

Solid Waste Management $ 816.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,309.00 60.4% Planning Application Plan Solid Waste
review as required by City R. No.: 22-9081 Prop 26 Exception: 1,2 Municipal Code R. Date: 4/19/2022
- First three (3) reviews Collected By:

Planning Full Cost: 1,309.00$
Solid Waste Management $ 816.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,309.00 60.4% Building Permit Application Solid Waste
Improvement plans review R. No.: 22-9081 Prop 26 Exception: 1,2 for solid waste management R. Date: 4/19/2022
compliance with City's Collected By:
municipal codes Building Full Cost: 1,309.00$
- First three (3) reviews
Construction & Demolition $ 204.00 Yes Charged By: Date: 4/19/2022 Objective: Recover Cost $ 319.00 56.4% (C&D) waste management: Solid Waste
Processing solid waste R. No.: 22-9081 Prop 26 Exception: 1,2 management and Green R. Date: 4/19/2022
Halo reconciliation Collected By:

Building Full Cost: 319.50$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
2023-24

PROPOSED NEW

CURRENT
FEE
and
PERIOD

OR REVISED FEE

COMMENTSFULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 11 - 25 Form: FEEFORM Revised: May 2011

This page is intentionally left blank.

Municipal Fee Schedule
Water and Sewer Utilities

This page is intentionally left blank.

SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change New 1" water service $ 20,862.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 21,823.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement Collected By: R. Date: 4/19/2022 Restoration not included.

Engineering
Full Cost: 21,823.74$
New 1" water service and abandon existing $ 25,229.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 26,392.00 4.6% service SFR Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement Collected By: R. Date: 4/19/2022 Restoration not included.

Engineering
Full Cost: 26,392.06$
New 2" water service $ 21,513.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 22,504.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement Collected By: R. Date: 4/19/2022 Restoration not included.

Engineering
Full Cost: 22,504.75$
New 3" water service $ 45,156.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 47,237.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement Collected By: R. Date: 4/19/2022 Restoration not included.

Engineering
Full Cost: 47,237.69$
New 4" water service $ 51,667.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 54,048.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement Collected By: R. Date: 4/19/2022 Restoration not included.

Engineering
Full Cost: 54,048.85$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Reference: CMD 109 12 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
New 6" water service $ 51,942.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 54,336.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement Collected By: R. Date: 4/19/2022 Restoration not included.

Engineering
Full Cost: 54,336.53$
New 8" water service $ 53,187.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 55,638.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement Collected By: R. Date: 4/19/2022 Restoration not included.

Engineering
Full Cost: 55,638.92$
New 4" water service (Dual Meter Service) $ 56,799.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 59,417.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement 4/19/2022 Restoration not included.

Collected By: R. Date: Full Cost: 59,417.43$
Engineering
New 6" water service (Dual Meter Service) $ 58,511.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 61,208.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement 4/19/2022 Restoration not included.

Collected By: R. Date:

Engineering Full Cost: 61,208.36$
Reference: CMD 109 12 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
New 8" water service (Dual Meter Service) $ 62,618.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, $ 65,504.00 4.6% Water backflows, Encroachment Permits,
R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement Collected By: R. Date: 4/19/2022 Restoration not included.

Engineering Full Cost: 65,504.69$
New 1" Water Meter - Device Cost Only $ 203.00 No Date: 4/19/2022 Objective: Recover Cost $ 212.00 4.4% R. No.: 22-9081 Prop 26 Exception: 2
R. Date: 4/19/2022
Full Cost: 212.36$
New 1" water meter and backflow preventer - $ 565.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes cost of meter and RP $ 591.00 4.6% device cost only Water backflow prevention device.

R. No.: 22-9081 Prop 26 Exception: 2 Fees for the meter or backflow can Collected By: R. Date: 4/19/2022 be assessed separately based on Engineering the discretion of the Water & Sewer
Full Cost: 591.05$ Utilities.

New 1½" water meter and backflow preventer - $ 1,547.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes cost of meter and RP $ 1,618.00 4.6% device cost only Water backflow prevention device.

R. No.: 22-9081 Prop 26 Exception: 2 Fees for the meter or backflow can Collected By: R. Date: 4/19/2022 be assessed separately based on Engineering the discretion of the Water & Sewer
Full Cost: 1,618.32$ Utilities.

Reference: CMD 109 12 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
New 2" water meter and backflow preventer - $ 1,869.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes cost of meter and RP $ 1,955.00 4.6% device cost only Water backflow prevention device.

R. No.: 22-9081 Prop 26 Exception: 2 Fees for the meter or backflow can Collected By: R. Date: 4/19/2022 be assessed separately based on Engineering the discretion of the Water & Sewer
Full Cost: 1,955.16$ Utilities.

New 3" water meter and backflow preventer - $ 4,717.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes cost of meter and RP $ 4,934.00 4.6% device cost only Water backflow prevention device.

R. No.: 22-9081 Prop 26 Exception: 2 Fees for the meter or backflow can Collected By: R. Date: 4/19/2022 be assessed separately based on Engineering the discretion of the Water & Sewer
Full Cost: 4,934.45$ Utilities.

New 4" water meter and backflow preventer - $ 6,227.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes cost of meter and RP $ 6,514.00 4.6% device cost only Water backflow prevention device.

R. No.: 22-9081 Prop 26 Exception: 2 Fees for the meter or backflow can Collected By: R. Date: 4/19/2022 be assessed separately based on Engineering the discretion of the Water & Sewer
Full Cost: 6,514.06$ Utilities.

New 6" water meter and backflow preventer - $ 12,935.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes cost of meter and RP $ 13,531.00 4.6% device cost only Water backflow prevention device.

R. No.: 22-9081 Prop 26 Exception: 2 Fees for the meter or backflow can Collected By: R. Date: 4/19/2022 be assessed separately based on Engineering the discretion of the Water & Sewer
Full Cost: 13,531.30$ Utilities.

New 8" water meter and backflow preventer - $ 17,967.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes cost of meter and RP $ 18,795.00 4.6% device cost only Water backflow prevention device.

R. No.: 22-9081 Prop 26 Exception: 2 Fees for the meter or backflow can Collected By: R. Date: 4/19/2022 be assessed separately based on Engineering the discretion of the Water & Sewer
Full Cost: 18,795.28$ Utilities.

Reference: CMD 109 12 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
New Fire hydrant $ 39,814.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost For hydrant requested by $ 41,649.00 4.6% Water property owner/developer.

R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Engineering
Full Cost: 41,649.43$
New Fire Service Charged By: Date: 4/19/2022 Objective: Recover Cost Cost for DCDA, RPDA, (Installation of fire service line) Water Encroachment Permit, Soil Disposal, R. No.: 22-9081 Prop 26 Exception: 2 and Pavement Restoration not 2" fire service $ 22,083.00 No Collected By: R. Date: 4/19/2022 Full Cost: 23,101.03$ included. $ 23,101.00 4.6% 4" fire service $ 50,947.00 No Engineering 53,295.66$ $ 53,295.00 4.6% 6" fire service $ 51,597.00 No 53,975.62$ $ 53,975.00 4.6% 8" fire service $ 52,486.00 No 54,905.60$ $ 54,905.00 4.6% 10" fire service $ 54,835.00 No 57,362.89$ $ 57,362.00 4.6% Fire Service Upgrade Charged By: Date: 4/19/2022 Objective: Recover Cost Cost for DCDA, RPDA, or (Upgrade device to standard DCDA Water Encroachment Permit not included. or RPDA) R. No.: 22-9081 Prop 26 Exception: 2
2" fire service $ 10,181.00 No Collected By: R. Date: 4/19/2022 Full Cost: 10,650.34$ $ 10,650.00 4.6% 4" fire service $ 20,734.00 No Engineering Full Cost: 21,689.84$ $ 21,689.00 4.6% 6" fire service $ 20,901.00 No Full Cost: 21,864.54$ $ 21,864.00 4.6% 8" fire service $ 21,097.00 No Full Cost: 22,069.57$ $ 22,069.00 4.6% 10" fire service $ 21,942.00 No Full Cost: 22,953.53$ $ 22,953.00 4.6% Reference: CMD 109 12 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Objective: Recover Cost
Backflow Preventer - Charged By: Date: 4/19/2022 Prop 26 Exception: 2 device cost only Water
2" DCDA $ 969.00 No R. No.: 22-9081 Full Cost: 1,013.67$ $ 1,013.00 4.5% 4" DCDA $ 3,042.00 No Collected By: R. Date: 4/19/2022 Full Cost: 3,182.24$ $ 3,182.00 4.6% 6" DCDA $ 4,549.00 No Engineering Full Cost: 4,758.71$ $ 4,758.00 4.6% 8" DCDA $ 8,462.00 No Full Cost: 8,852.10$ $ 8,852.00 4.6% 10" DCDA $ 12,173.00 No Full Cost: 12,734.18$ $ 12,734.00 4.6% 2" RPDA $ 969.00 No Full Cost: 1,013.67$ $ 1,013.00 4.5% 4" RPDA $ 4,169.00 No Full Cost: 4,361.19$ $ 4,361.00 4.6% 6" RPDA $ 6,528.00 No Full Cost: 6,828.94$ $ 6,828.00 4.6% 8" RPDA $ 12,430.00 No Full Cost: 13,003.02$ $ 13,003.00 4.6% 10" RPDA $ 16,399.00 No Full Cost: 17,154.99$ $ 17,154.00 4.6% Field Fire Hydrant Flow Test $ 1,884.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,970.00 4.6% Water
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Finance /
Municipal Serv. Full Cost: 1,970.85$
Portable hydrant meter Charged By: Date: 6/22/2021 Objective: Recover Cost Deposit to ensure return of meter, and Deposit $ 2,185.00 No Water or cover replacement if lost or $ 2,285.00 4.6% (Includes cost of RP backflow) R. No.: 21-8981 Prop 26 Exception: 1,2 damaged. $125 of the deposit is Collected By: R. Date: 6/22/2021 non-refundable.

Finance /
Municipal Serv. Full Cost: 2,285.73$
Recycled hydrant meter Charged By: Date: 6/22/2021 Objective: Recover Cost Deposit to ensure return of meter, and Deposit $ 2,185.00 No Water or cover replacement if lost or $ 2,285.00 4.6% (Includes cost of RP backflow) R. No.: 21-8981 Prop 26 Exception: 1,2 damaged. $125 of the deposit is Collected By: R. Date: 6/22/2021 non-refundable.

Finance /
Municipal Serv. Full Cost: 2,285.73$
Reference: CMD 109 12 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Water meter test $ 478.50 No Charged By: Date: 4/19/2022 Objective: Recover Cost Non-routine testing of water $ 500.00 4.5% Water meter when customer questions
R. No.: 22-9081 Prop 26 Exception: 1,2 meter accuracy. Refundable if Collected By: R. Date: 4/19/2022 meter falls outside accepted Finance / range.

Municipal Serv. Full Cost: 870.88$
Utility Engineering Plan Review Date: 4/19/2022 Objective: Recover Cost Charged By: R. No.: 22-9081 Prop 26 Exception: 3
Utility Engineering Plan Check for SFH Remodel $ 620.00 R. Date: 4/19/2022 Full Cost: 648.58$ $ 648.00 4.5% (per plan set) - includes 3 checks
Water
Utility Engineering Plan Check for $ 1,067.00 No Full Cost: 1,116.19$ Includes all projects with dry $ 1,116.00 4.6% Projects up to $25K (per plan Collected By: utility installation. set) - includes 3 checks Engineering
Utility Engineering Plan Check for $ 2,580.00 No Full Cost: 2,698.94$ Includes all projects with dry $ 2,698.00 4.6% Projects over $25K utility installation.
(per sheet) - includes 3 checks
Utility Engineering Plan Check $ 658.00 No Full Cost: 688.33$ Includes all projects with dry $ 688.00 4.6% (per plan set for Projects up to utility installation.
$25K and per sheet for
Projects over $25K) - 4th and
subsequent review
Utility Engineering Inspection*
$0-$15K $ 576.00 No Full Cost: 602.55$ *Use this fee for all SFH remodels $ 602.00 4.5% $15,001-$25K-base + 13.73% of cost above $15K $ 1,151.00 No Full Cost: 1,204.06$ $ 1,204.00 4.6% $25,001-$50K-base + 11.87% of cost above $25K $ 2,524.00 No Full Cost: 2,640.36$ $ 2,640.00 4.6% $50,001-$100K-base + 2.22% of cost above $50K $ 5,492.00 No Full Cost: 5,745.18$ $ 5,745.00 4.6% $101K-$200K-base + 4.22% of cost above $100K $ 6,602.00 No Full Cost: 6,906.35$ $ 6,906.00 4.6% $201K-$500K-base + 3.03% of cost above $200K $ 10,820.00 No Full Cost: 11,318.80$ $ 11,318.00 4.6% $501K-$1M-base + 0.67% of cost above $500K $ 19,922.00 No Full Cost: 20,840.40$ $ 20,840.00 4.6% >$1M; base $ 23,252.00 No Full Cost: 24,323.92$ $ 24,323.00 4.6% >$1M for each add'l $500K or fraction thereof $ 7,157.00 No Full Cost: 7,486.94$ $ 7,486.00 4.6% Reference: CMD 109 12 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
R. No.: 22-9081 Prop 26 Exception: 6 Water Supply Assessment Water Supply Assessment $ 13,500.00 No Collected By: R. Date: 4/19/2022 prepartaion services rendered by the $ 14,122.00 4.6% Preparation Finance Water Utility.

Supplemental Assessment $ 8,640.00 No Full Cost: 14,122.35$ Required due to changes in project. $ 9,038.00 4.6% Preparation
Full Cost: 9,038.30$

Water reconnection fee - $ 245.00 No Charged By: Date: 6/22/2021 Objective: Recover Cost $ 256.00 4.5% standard service reconnection per account Water Penalty per account R. No.: 21-8981
Water meter repair replacement/reconnection fee $ 445.00 No Collected By: R. Date: 6/22/2021 Prop 26 Exception: 1,2,5 $ 465.00 4.5% due to meter tampering/illegal access. per account Finance / per account Municipal Serv. Full Cost: 395.93$
Fee to fix meter Full Cost: 627.66$ Fee to fix meter plus two (2) plus two (2)
times the times the
estimated cost estimated cost
of services used of services used
Water service abandonment (2" and smaller) $ 9,361.36 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of Encroachment $ 9,792.00 4.6% Water Permit, Soil Disposal, and Pavement
R. No.: 22-9081 Prop 26 Exception: 1,2 Restoration not included.

Collected By: R. Date: 4/19/2022
Finance
Full Cost: 9,792.92$
Water service abandonment (3" and larger) $ 19,985.44 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of Encroachment $ 20,906.00 4.6% Water Permit, Soil Disposal, and Pavement
R. No.: 22-9081 Prop 26 Exception: 1,2 Restoration not included.

Collected By: R. Date: 4/19/2022
Finance
Full Cost: 20,906.77$
Reference: CMD 109 12 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Water service relocation $ 7,128.00 No Charged By: Date: 6/22/2021 Objective: Recover Cost For service relocation of no more $ 7,456.00 4.6% Water than 4 feet from the existing
R. No.: 21-8981 Prop 26 Exception: 1,2 location.

Collected By: R. Date: 6/22/2021 Note: The cost of Encroachment Finance Permit, Soil Disposal, and Pavement
Full Cost: 7,456.60$ Restoration not included.

Objective: Recover Cost
Field Marking - Water Charged By: Date: 4/19/2022 Prop 26 Exception: 2 Up to 50 ft. of excavation $ 273.25 No Water Full Cost: 285.85$ $ 285.00 4.3% R. No.: 22-9081
Over 50 ft. - each additional $ 111.00 No Collected By: R. Date: 4/19/2022 Full Cost: 116.12$ $ 116.00 4.5% 50 ft. or fraction thereof of excavation Finance
excavation
Objective: Recover Cost
Field Marking - Recycled Water Charged By: Date: 4/19/2022 Prop 26 Exception: 2 Up to 50 ft. of excavation $ 273.25 No Water Full Cost: 285.85$ $ 285.00 4.3% R. No.: 22-9081
Over 50 ft. - each additional $ 111.00 No Collected By: R. Date: 4/19/2022 Full Cost: 116.12$ $ 116.00 4.5% 50 ft. or fraction thereof of Finance
excavation
Water and Fire Service Tap (2" and smaller) $ 1,062.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes installation and inspection $ 1,110.00 4.5% Water of water main tap only.

R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 1,110.96$
Water and Fire Service Tap (4", 6", and 8") $ 1,188.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Includes installation and inspection $ 1,242.00 4.5% Water of water main tap only.

R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 1,242.77$
Reference: CMD 109 12 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Water and Fire Service Tap (10" and 12") $ 1,588.00 No Date: 4/19/2022 Objective: Recover Cost Includes installation and inspection $ 1,661.00 4.6% of water main tap only.

R. No.: 22-9081 Prop 26 Exception: 2
R. Date: 4/19/2022
Full Cost: 1,661.21$
Insertion Valve Installation Charged By: Date: 4/19/2022 Objective: Recover Cost Includes installation and inspection Water Prop 26 Exception: 2 of valve only.

R. No.: 22-9081
4" Valve $ 14,602.00 No Collected By: R. Date: 4/19/2022 Full Cost: 15,275.15$ $ 15,275.00 4.6% 6" Valve $ 15,399.00 No Engineering Full Cost: 16,108.89$ $ 16,108.00 4.6% 8" Valve $ 16,097.00 No Full Cost: 16,839.07$ $ 16,839.00 4.6% 10" Valve $ 19,224.00 No Full Cost: 20,110.23$ $ 20,110.00 4.6% 12" Valve $ 20,764.00 No Full Cost: 21,721.22$ $ 21,721.00 4.6% Insertion Valve Installation Objective: Recover Cost
Prop 26 Exception: 2
4" Valve (excavation included) $ 25,500.00 No Date: 4/19/2022 Full Cost: 26,675.55$ Note: The cost of Encroachment $ 26,675.00 4.6% 6" Valve (excavation included) $ 26,297.00 No Full Cost: 27,509.29$ Permit, Soil Disposal, and Pavement $ 27,509.00 4.6% 8" Valve (excavation included) $ 26,995.00 No R. No.: 22-9081 Full Cost: 28,239.47$ Restoration not included. $ 28,239.00 4.6% 10" Valve (excavation included) $ 30,122.00 No R. Date: 4/19/2022 Full Cost: 31,510.62$ $ 31,510.00 4.6% 12" Valve (excavation included) $ 31,662.00 No Full Cost: 33,121.62$ $ 33,121.00 4.6% Project Clearance Committee - Utility Engineering/ $ 1,252.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,309.00 4.6% Subcommittee Review Water
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 1,309.72$
Reference: CMD 109 12 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Hold Harmless Agreement $ 966.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 1,010.00 4.6% Water
R. No.: 22-9081 Prop 26 Exception: 2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 1,010.53$
Fire Flow (Hydraulic Model) Charged By: Date: 4/19/2022 Objective: Recover Cost Water Prop 26 Exception: 2
Single Family Homes (SFH) $ 959.00 No R. No.: 22-9081 Full Cost: 1,003.21$ $ 1,003.00 4.6% Others, Excluding SFH $ 2,131.00 No Collected By: R. Date: 4/19/2022 Full Cost: 2,229.24$ $ 2,229.00 4.6% Finance
Development Impact Analysis $ 2,783.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost This is a hydraulic modeling fee for $ 2,911.00 4.6% Water new development.

R. No.: 22-9081 Prop 26 Exception: 6
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 2,911.30$
Water Service Upgrade of Existing Service Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of meters, excluding Device Cost Water backflows, Encroachment Permit, R. No.: 22-9081 Prop 26 Exception: 2 Soil Disposal, and Pavement 5/8" x 3/4" water services and $ 10,146.00 No Collected By: R. Date: 4/19/2022 Full Cost: 10,613.73$ Restoration not included. $ 10,613.00 4.6% backflow preventer Finance
1" water service and $ 10,146.00 No Full Cost: 10,613.73$ $ 10,613.00 4.6% backflow preventer
1-1/2" water service and $ 10,180.00 No Full Cost: 10,649.30$ $ 10,649.00 4.6% backflow preventer
2" water service and $ 10,180.00 No Full Cost: 10,649.30$ $ 10,649.00 4.6% backflow preventer
3" water service and $ 10,515.00 No Full Cost: 10,999.74$ $ 10,999.00 4.6% backflow preventer
Reference: CMD 109 12 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / SEWER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change Sewer lateral cleanout $ 2,207.04 No Charged By: Date: 4/19/2022 Objective: Recover Cost When no cleanout exists, it $ 2,308.00 4.6% 4 inch lateral Sewer is necessary that one be
R. No.: 22-9081 Prop 26 Exception: 1,2 installed in order for City to Collected By: R. Date: 4/19/2022 have access to sewer lateral for Finance courtesy maintenance.

Full Cost: 10,678.59$ Cleanout box is not included.

Sewer lateral cleanout $ 10,922.67 No Charged By: Date: 4/19/2022 Objective: Recover Cost When no cleanout exists, it $ 11,426.00 4.6% 6 inch lateral or larger Sewer is necessary that one be R. No.: 22-9081 Prop 26 Exception: 1,2 installed in order for City to Collected By: R. Date: 4/19/2022 have access to sewer lateral for Finance courtesy maintenance.

Full Cost: 11,426.21$ Cleanout box is not included.

Cleanout box only $ 344.85 No Charged By: Date: 4/19/2022 Objective: Recover Cost $ 360.00 4.4% Sewer
R. No.: 22-9081 Prop 26 Exception: 1,2
Collected By: R. Date: 4/19/2022
Finance
Full Cost: 983.33$
4" sewer lateral installation $ 40,443.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of Encroachment $ 42,307.00 4.6% Sewer Permit, Soil Disposal, and
R. No.: 22-9081 Prop 26 Exception: 2 Pavement Restoration not Collected By: R. Date: 4/19/2022 included.

Engineering
Full Cost: 42,307.63$ No cleanout or box cost included. 6" sewer lateral installation $ 40,443.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of Encroachment $ 42,307.00 4.6% Sewer Permit, Soil Disposal, and
R. No.: 22-9081 Prop 26 Exception: 2 Pavement Restoration not Collected By: R. Date: 4/19/2022 included.

Engineering
Full Cost: 42,307.63$ No cleanout or box cost included.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Reference: CMD 109 12 - 12 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / SEWER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
8" sewer lateral installation $ 40,443.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Note: The cost of Encroachment $ 42,307.00 4.6% Sewer Permit, Soil Disposal, and
R. No.: 22-9081 Prop 26 Exception: 2 Pavement Restoration not Collected By: R. Date: 4/19/2022 included.

Engineering
Full Cost: 42,307.63$ No cleanout or box cost included.

Sewer lateral video $ 463.19 No Charged By: Date: 4/19/2022 Objective: Recover Cost Video inspection of existing $ 484.00 4.5% inspection Sewer lateral to determine that its
R. No.: 22-9081 Prop 26 Exception: 2 replacement is not required Collected By: R. Date: 4/19/2022 as a condition of
Finance redevelopment.

Full Cost: 960.32$
Encroachment Permit: Charged By: Date: 4/19/2022 Objective: Recover Cost Field Marking-Sanitary Sewer Engineering/
Up to 50 ft. of excavation $ 273.00 No LPD R. No.: 22-9081 Prop 26 Exception: 1,2,3 See Article 2 of Chapter 3.1 $ 285.00 4.4% R. Date: 4/19/2022 of Div. 5 of Title 1 of the
Over 50 ft. - each additional $ 273.00 No Collected By: Government Code. $ 285.00 4.4% 50 ft. or fraction thereof of plus Finance Full Cost: 285.85$ plus excavation $ 111.00 No Full Cost: 116.12$ $ 116.00 4.5% each add'l 50 ft each add'l 50 ft
or fraction thereof or fraction thereof
Fats, Oil and Grease (FOG) Charged By: Date: 4/19/2022 Objective: Recover Cost Building Division Prop 26 Exception: 1,2,3
FOG Plan Review and Inspection Fee $ 2,496.00 No R. No.: 22-9081 Full Cost: -$ For new building permit $ 2,611.00 4.6% (Building Permits) Collected By: R. Date: 4/19/2022 applicants Building Division
Full Cost: 2,611.07$
FOG Plan Review $ 1,248.00 No Combine plan review and
(Building Permits) permit into one fee
FOG Inspection $ 1,248.00 No
(Building Permits)
Reference: CMD 109 12 - 13 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES / SEWER RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Temporary Wastewater Charged By: Date: 4/19/2022 Objective: Recover Cost Discharge Permit Prop 26 Exception: 1,2
($5.29/HCF R. No.: 22-9081 Use per HCF / per 1000 gal ($5.29/HCF or $7.07/1000 gal) R. Date: 4/19/2022 structure or $7.07/1000 gal) Collected By:

Up to 10,000 gallons $ 278.70 No Full Cost: 278.70$ $ 278.70 Up to 50,000 gallons $ 561.50 No Full Cost: 561.50$ $ 561.50 Up to 100,000 gallons $ 915.00 No Full Cost: 915.00$ $ 915.00 Up to 200,000 gallons $ 1,622.00 No Full Cost: 1,622.00$ $ 1,622.00 Up to 300,000 gallons $ 2,329.00 No Full Cost: 2,329.00$ $ 2,329.00 Up to 400,000 gallons $ 3,036.00 No Full Cost: 3,036.00$ $ 3,036.00 Up to 500,000 gallons $ 3,743.00 No Full Cost: 3,743.00$ $ 3,743.00 More than 500,000 gallons $ Actual No Full Cost: Actual $ Actual Wastewater Treatment Plant $ 1,187.00 No Charged By: Date: 5/8/2018 Objective: Recover Cost Accessory Dwelling Unit $ 1,187.00 Capacity Fee per dwelling unit Engineering/ Charge per City Ordinance 1968 per dwelling unit Residential Dwelling Unit LPD O. No.: Prop 26 Exception: 2 passed by Council on 8/22/2017.

O. Date:

Collected By:

Accessory Dwelling Unit $ 747.00 No Finance Full Cost: 2,490.71$ $ 747.00 per accessory O. No.: 1968 per accessory
dwelling unit O. Date: 8/22/2017 dwelling unit
Wastewater Treatment Plant Charged By: Date: 4/18/2017 Objective: Recover Cost Capacity Fee Engineering/
Non-residential $ 4.47 No LPD O. No.: Prop 26 Exception: 6 $ 4.47 per gallon O. Date: per gallon
per day Collected By: Full Cost: 10.63$ per day Finance
Reference: CMD 109 12 - 14 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:

WATER & SEWER UTILITIES /SOLAR RESOLUTION NUMBER: APPROVED:

CHARGING DATE FEE

TECHNOLOGY DEPT / DIV LAST CHANGED
FEE (3.37%) --------- ORDINANCE
DESCRIPTION OF APPLIES COLLECTING NUMBER & DATE Percent FEE , RATE OR CHARGE (Yes or No) DEPT / DIV (if applicable) COMMENTS Change Solar pool heating system $ 4,847.70 No Charged By: Date: 4/19/2022 Objective: Recover Cost Costs are recovered through $ 5,071.00 4.6% Installation Fee plus Water/Solar the combination of installation plus R. No.: 22-9081 Prop 26 Exception: N/A fees and monthly service $ 282.70 No Collected By: R. Date: 4/19/2022 charges, and recoverable $ 295.00 4.4% per panel Finance Full Cost: 17,047.25$ system components. per panel Full Cost: 1,065.45$
Solar domestic hot water $ Actual Cost No Charged By: Date: 6/9/2009 Objective: Recover Cost Costs are recovered through $ Actual Cost system installation fee Water/Solar the combination of installation Single-family fee R. No.: Prop 26 Exception: N/A fees and monthly service Collected By: R. Date: charges, and recoverable
Finance Full Cost: Actual Cost system components.

Solar domestic hot water $ Actual Cost No Charged By: Date: 3/14/1985 Objective: Recover Cost Installation fees based on cost $ Actual Cost system installation fee Water/Solar of labor and permanently- Multi-family fee R. No.: Prop 26 Exception: N/A installed materials. Example Collected By: R. Date: for system to serve 10
Finance Full Cost: Actual Cost dwelling units. Remaining costs recovered by monthly
service charges.

Solar domestic hot water $ 568.70 No Charged By: Date: 4/19/2022 Objective: Recover Cost Costs are recovered through $ 594.00 4.4% system panel removal per panel Water/Solar the combination of installation per panel and replacement fee R. No.: 22-9081 Prop 26 Exception: N/A fees and monthly service Collected By: R. Date: 4/19/2022 charges, and recoverable Finance system components.

Full Cost: 3,941.70$
Solar pool heating system $ 345.00 No Charged By: Date: 4/19/2022 Objective: Recover Cost Costs are recovered through $ 360.00 4.3% system panel removal per panel Water/Solar the combination of installation per panel and replacement fee R. No.: 22-9081 Prop 26 Exception: N/A fees and monthly service Collected By: R. Date: 4/19/2022 charges, and recoverable Finance system components.

Full Cost: 360.90$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

FULL COST FACTOR

FEE DETAIL

OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.)

CURRENT
FEE
and
PERIOD

PROPOSED NEW

OR REVISED FEE
2023-24
Reference: CMD 109 12 - 15 Form: FEEFORM Revised: May 2011

This page is intentionally left blank.

Municipal Fee Schedule
Alphabetical Listing by Fee

This page is intentionally left blank.

Fee Section Page No.
2-Way Elevator Permit Fire 7 - 24
10-Day Letter for House Meter Finance 6 - 11
ABC Review Verification Community Development 4 - 35
Aboveground Petroleum Storage Tank Program Fire 7 - 59
Access Control and Traffic Calming Fire 7 - 20
Access Controlled Egress Fire 7 - 26
Active Construction Site Inspections of Projects Street 11 - 20 Additional Temporary Membrane Structure and Tent Fire 7 - 23 Addressing Community Development 4 - 14
Administrative Citations Fire 7 - 53
Affordable Housing Application Community Development 4 - 22 AHA Affordable Housing Agreement Community Development 4 - 22 Alarm Permit Police 10 - 1
Alternate Materials and Methods Review (per hour) Community Development 4 - 13 Alternate Materials and Methods Review Fire 7 - 6
Amended Final Map Checking Engineering 11 - 2
Amended Parcel Map and Record of Survey Checking Engineering 11 - 1 Amplified Music Parks and Recreation 9 - 21
Amplified Music Permit Finance 6 - 9
Animal Control - Adoption Police 10 - 17
Animal Control - Animal Surrender Police 10 - 18
Animal Control - License Police 10 - 16
Animal Control - Other Fees Police 10 - 18
Animal Control - Shelter Services Police 10 - 17
Animal Control - Trap Police 10 - 18
Annexation of Territory to City of Santa Clara Community Development 4 - 31 Appeals Community Development 4 - 30
Application Extension Community Development 4 - 14
Architectural Review Community Development 4 - 31
Assessment District Reapportionment Engineering 11 - 2
Automatic Fire Extinguishing Systems Fire 7 - 6
Automatic Fire Protection System for Spray Booths Fire 7 - 24 Automatic Fire Sprinkler Systems - Existing Fire 7 - 7
Automatic Fire Sprinkler Systems - New Fire 7 - 6
Automatic Fire Sprinkler Systems - Residential 13D Fire 7 - 24 Backflow Preventer - Device Cost Only Water and Sewer Utilities 12 - 6

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
13 - 1
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Backflow Preventer Replacement Fire 7 - 17
Bathroom Remodel Community Development 4 - 15
Battery Systems Fire 7 - 9
Billing Service Charge for Late Payment Finance 6 - 10
Bingo Organization Police 10 - 1
Black Line Print of Plans on File Engineering 11 - 5
Block Party Request Finance 6 - 9
Borrowing Materials from Other Libraries (Interlibrary Loan) Library 8 - 2 Building Conformance Fee Community Development 4 - 3
Building Permit Site Clearance Engineering 11 - 16
Building Plans Fire 7 - 9
Burial Materials Processing Parks and Recreation 9 - 14 Burial Permit Filing Parks and Recreation 9 - 7
Business Certificate Information Finance 6 - 2
Business Tax Certificate Finance 6 - 1
CAD Report for Legal Purposes Police 10 - 1
California Accidental Release Program (CALARP) Fire 7 - 56 Carbon Dioxide Beverage Dispensing System Fire 7 - 28
Carnivals and Fairs Fire 7 - 9
Casket Parks and Recreation 9 - 2
Casket Burial Parks and Recreation 9 - 1
CD for Legal Purposes Police 10 - 1
CD/DVD Materials Citywide 1 - 1
Central Park - Picnic Area Parks and Recreation 9 - 18
Certificate of Compliance Community Development 4 - 33
Certificate of Compliance Processing Engineering 11 - 2 Certificate of Correction Processing Engineering 11 - 2 Change of Name, Address or Business Type as Shown on
Current Certificate
Finance 6 - 2
Chapel Rental Parks and Recreation 9 - 9
Citation Sign Off Police 10 - 2
City Flag Finance 6 - 9
City Plaza Park Gazebo Parks and Recreation 9 - 18
City to Repurchase Interment Rights Parks and Recreation 9 - 7 Cleanout Box Only Water and Sewer Utilities 12 - 12
13 - 2
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Clearance Letter Police 10 - 2
Closing Out Sale Police 10 - 2
Closure of an Onsite Hazardous Waste Treatment System Fire 7 - 10 Code Enforcement Re-Inspection Community Development 4 - 37 Collection Agency Fee Library 8 - 2
Color Photographs Police 10 - 2
Combination Agreement/Grant Deed for the Same Lot Engineering 11 - 7 Combustible and Flammable Materials Fire 7 - 44
Commercial Day Care (E3) Fire 7 - 48
Community Development Department Referrals Fire 7 - 19
Community Recreation Center Room Rental Parks and Recreation 9 - 17 Compressed Gas Installation Fire 7 - 10
Compressed Gases Fire 7 - 44
Concrete Removal/Replace Street 11 - 22
Construction & Demolition Street 11 - 25
Contract Administration Community Development 4 - 36
Cooking Oil Storage Tanks Fire 7 - 10
Copy Fee Citywide 1 - 1
Corrosives Fire 7 - 45
Cost Analysis for Development Engineering 11 - 18
Cremation Parks and Recreation 9 - 2
Crime Analysis Reports Police 10 - 4
Cryogenic Fluids Fire 7 - 45
Custom Hourly Rate Parks and Recreation 9 - 8
Delinquent Payment of Business Certificate Fees Finance 6 - 2 Delinquent Reconnect Finance 6 - 11
Delinquent Service Letter Finance 6 - 10
Demolition of Building Fire 7 - 11
Design Review/Consultation Fire 7 - 29
Development Agreement Community Development 4 - 33
Development Impact Analysis Water and Sewer Utilities 12 - 11 Development Impact Fees Community Development 4 - 25
Dig Single Depth Grave to Double Depth Parks and Recreation 9 - 7 Disinter and Reinter Casket into Same Grave Parks and Recreation 9 - 4 Disinternment Parks and Recreation 9 - 3
13 - 3
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Dispatch Service Required for Special Events Police 10 - 4 Distribution Pole Contact Electric Utility 5 - 11
Document Recordation Engineering 11 - 7
Driving Under the Influence Emergency Response Police 10 - 4 Duplicate Business Certificate Finance 6 - 2
Electric Disconnection Fee Electric Utility 5 - 6
Electric Equipment Relocation Electric Utility 5 - 9
Electric Reconnection Fee Electric Utility 5 - 6
Electric Replacement/Reconnection Fee Due to Meter
Tampering/Illegal Access
Electric Utility 5 - 7
Electric System Damage Electric Utility 5 - 5
Electrical Permit Community Development 4 - 3
Emergency Alarm Systems Fire 7 - 11
Emergency Responder Radio Coverage System Fire 7 - 11
Encroachment Agreement Application Engineering 11 - 6
Encroachment Permit Engineering 11 - 3
Encroachment Permit: Field Marking - Sanitary Sewer Water and Sewer Utilities 12 - 13 Energy Storage Systems Fire 7 - 27
Engineering Plan Check - Electric Electric Utility 5 - 7 Engineering Plan Review (Streets) Street 11 - 22
Engineering Referrals Fire 7 - 12
Environmental Review Community Development 4 - 32
Environmental Impact Report Fire 7 - 12
Equiment Rentals Parks and Recreation 9 - 18
Exhibit and Trade Shows Fire 7 - 13
Existing Improvements Engineering 11 - 11
Expired Construction Permit Fire 7 - 51
EV Charging Retrofit Electric Utility 5 - 9
Facility Rental Fire 7 - 3
False Alarm Calls Police 10 - 5
False Alarm Responses Fire 7 - 51
Fats, Oils, and Grease (FOG) Water and Sewer Utilities 12 - 13 Fee for Work Commencing Before Permit Issuance Community Development 4 - 19 Field Fire Hydrant Flow Test Water and Sewer Utilities 12 - 6 Field Marking - Fiber Electric Utility 5 - 9
13 - 4
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Field Marking - Recycled Water Water and Sewer Utilities 12 - 9 Field Marking - Water Water and Sewer Utilities 12 - 9
Field Preparation Parks and Recreation 9 - 21
Fields and Turf Areas Reservations Parks and Recreation 9 - 20 Final Map Checking Engineering 11 - 1
Fingerprinting Police 10 - 5
Fire Alarm Systems Fire 7 - 13
Fire Alarm Systems with Pre-Wire Inspection Required Fire 7 - 14 Fire Flow (Hydraulic Model) Water and Sewer Utilities 12 - 11 Fire Hydrant Water and Sewer Utilities 12 - 5
Fire Pump Installation Fire 7 - 16
Fire Safety Demolition/Construction Plan Fire 7 - 26
Fire Service Water and Sewer Utilities 12 - 5
Fire Service Upgrade Water and Sewer Utilities 12 - 5
Firefighter Air Replenishment System Fire 7 - 28
First Tent, Canopy or Air Supported Structure Fire 7 - 22 First Year Maintenance Fee Parks and Recreation 9 - 8
Flat Marker Parks and Recreation 9 - 5
Flood Zone Verification Community Development 4 - 34
Foundation Repair / Seismic Upgrade Community Development 4 - 15 General Plan / Advanced Planning Surcharge Community Development 4 - 2 General Plan Amendment Community Development 4 - 32
Grading Permit Community Development 4 - 11
Grading Plan Review Community Development 4 - 11
Hazardous Material Tool/Equipment Installation Fire 7 - 18 Hazardous Materials Business Plan Fire 7 - 61
Hazardous Materials Closure Plan Fire 7 - 17
Hazardous Materials Tool/Equipment Modification Fire 7 - 27 Hazardous Waste Generator Fire 7 - 55
High-Piled Combustible Storage Fire 7 - 18
High-Rise Fire 7 - 48
High-Rise Fire Protection Water Storage Tank Fire 7 - 16 High-Rise R-1/R-2 Fire 7 - 48
Highly Toxic Materials Fire 7 - 45
Historical & Landmarks Community Development 4 - 34
Hold Harmless Agreement Water and Sewer Utilities 12 - 11 13 - 5
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Hospitals Fire 7 - 50
Hourly Rate (Personnel) Parks and Recreation 9 - 8
Hourly Staff (As-Needed) Assigned to Facility Parks and Recreation 9 - 18 ID Card Renewal/Replacement Police 10 - 6
In-House Planning Rate Community Development 4 - 36
Industrial Scaled Permit Community Development 4 - 18
Industrial/Commercial Facility Stormwater Inspections Street 11 - 20 Insertion Valve Installation Water and Sewer Utilities 12 - 10 Inscribe Shutters or Grave Markers Parks and Recreation 9 - 4 Installation of a Flower Vase and Ring on a Niche Parks and Recreation 9 - 4 Installation of a Monobar, Emblem, Flower Vase, or Ring on a Crypt Parks and Recreation 9 - 4 Installation of a Niche Plaque Parks and Recreation 9 - 5 Installation of Grave Marker Parks and Recreation 9 - 5 Jails Fire 7 - 50
Jump House Permit Parks and Recreation 9 - 22
Jury Fees Citywide 1 - 2
Knox Box Installation Fire 7 - 18
Late Filing of Documents/Reports/Information Fire 7 - 53 Late Payment of CUPA Fire 7 - 52
Late Payment of Operational Permits Fire 7 - 53
Licensed Care Facility Fire 7 - 30
Liquefied Petroleum Gas Fire 7 - 45
Liquefied Petroleum Gases - Installation Per Tank Fire 7 - 18 Load Development Electric Utility 5 - 3
Loan Demand Payoff Community Development 4 - 21
Lobbying Activities City Clerk 2 - 1
Lot Line Adjustment Processing Engineering 11 - 3
Maps Community Development 4 - 30
Massage Application / Inspections Police 10 - 6
Master Plan Fee Community Development 4 - 13
Mechanical Permit Community Development 4 - 5
Meter Reading More Than Once Per Month Finance 6 - 11
Meter Test Deposit Electric Utility 5 - 5
Methane Venting and Detection Systems Fire 7 - 19
Microfilm Copies Fire 7 - 54
13 - 6
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Mills Act Application Community Development 4 - 33
Minor Amendment to Approved Projects Community Development 4 - 35 Minor Modifications Community Development 4 - 28
Minor Residential Combination Permits Community Development 4 - 1 Miscellaneous Inspections or Plan Reviews Fire 7 - 29
Mission City Memorial Park Interment Rights and Burial Materials Parks and Recreation 9 - 15 Motor Funeral Escort Police 10 - 7
Multi-Family Loan Conversion Community Development 4 - 23 Multi-Family Loan Origination Community Development 4 - 23 Multi-Family Loan Recapitalization Community Development 4 - 24 Multi-Family (MF) Loan Refinance / Subordination Community Development 4 - 20 Multi-Family (MF) Loan Subordination Request Review Community Development 4 - 20 Multi-Family Monitoring Community Development 4 - 22
Multi-Family Project Refinance Community Development 4 - 24 Multi-Family Project Restructuring - Transfer of Ownership Community Development 4 - 24 Multi-Family Transaction Application Review Community Development 4 - 23 Multi-Story Buildings Fire 7 - 41
Municipal Services Information Finance 6 - 11
Neighborhood Conservation Improvement Program (NCIP) Loan Application Community Development 4 - 20 Neighborhood Parks Parks and Recreation 9 - 22
No-Fee Parade Permit City Manager 3 - 1
Non-Exclusive Franchise Hauler Application Street 11 - 25 Non-Historical Referral to Historical and Landmarks Commission Community Development 4 - 35 Off-Duty Employment Police 10 - 8
Off-Site Parking Community Development 4 - 29
On-Demand Mobile Fueling Site Permit Fire 7 - 24
Onsite Treatment of Hazardous Waste Annual Fee Fire 7 - 57 Open Burnings Fire 7 - 19
Operation & Maintenance Inspection of Stormwater Treatment Systems Street 11 - 20 Operational Permits Fire 7- 31
Organic Peroxides Fire 7 - 46
Other Inspections and Fees Community Development 4 - 11 Outside 3rd Party Review (public ROW or easements) Engineering 11 - 8 Outside 3rd Party Review (survey or mapping) Engineering 11 - 8 Ovens Fire 7 - 19
Overdue Fines - All Other Items Excluding Children's Books Library 8 - 1 13 - 7
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Overdue Fines Covering Interlibrary Loans Library 8 - 1 Overdue Fines for Portable Electronic Devices Library 8 - 3 Overhead Lines - New Electric Utility 5 - 1
Oversize, Overweight Vehicles Engineering 11 - 15
Outdoor Assembly Event Fire 7 - 30
Overtime Inspection Fire 7 - 29
Overtime Plan Check, Mapping Review Engineering 11 - 8
Overtime Plan Review Fire 7 - 29
Oxidizing Materials Fire 7 - 46
Parcel Map and Record of Survey Checking Engineering 11 - 1 Park Building Room Rentals Parks and Recreation 9 - 17
Parking at Parks and Recreation Facilities Parks and Recreation 9 - 23 Parkways and Boulevards Plan Review Street 11 - 24
Patrick Henry Drive Specific Plan Area Impact Engineering 11 - 14 Pavement Restoration Street 11 - 22
Pawn/Secondhand Dealer Police 10 - 9
Payment Default Citywide 1 - 1
Permit Extension Community Development 4 - 14
Permit Issuance Community Development 4 - 2
Permit to Final (per trade) Community Development 4 - 13 Perpetual Care (Endowment) Parks and Recreation 9 -10
Phased Permitting/Occupancy Plan Fire 7 - 26
Phased Plan Check (per each phase) Community Development 4 - 12 Photo CD's Police 10 - 9
Photographs Fire 7 - 54
Photovoltaic Community Development 4 - 15
Plan Duplication Community Development 4 - 14
Plan Revision/Resubmittal Fire 7 - 28
Plant Extraction Systems Fire 7 - 28
Plumbing Permit Community Development 4 - 8
Police Reports Police 10 - 9
Pool Demo Community Development 4 - 16
Pool Rentals Parks and Recreation 9 - 23
Portable Hydrant Meter and Deposit Water and Sewer Utilities 12 - 6 Pre-Application Community Development 4 - 34
13 - 8
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Preparation of Agreement/Easement/Grant Deed Engineering 11 - 7 Private Security Police 10 - 10
Project Clearance Committee Review Engineering 11 - 17
Project Clearance Committee/Subcommittee Review Electric Utility 5 - 8 Project Clearance Committee/Subcommittee Review Water and Sewer Utilities 12 - 10 Public Entertainment Police 10 - 10
Public Fireworks Display and Pyrotechnic Special Effects Use Fire 7 - 20 Pyrophoric Materials Fire 7 - 46
Pyrotechnics Special Effects Proximal to Audience Fire 7 - 20 R-1/R-2 Occupancies Fire 7 - 48
Re-Inspection Fire 7 - 51
Record Drawings Archiving Engineering 11 - 6
Recreation Cancellation Parks and Recreation 9 - 21
Recreation Classes Parks and Recreation 9 - 24
Recreation Tax (Bedroom) Engineering 11 - 13
Recycled Hydrant Meter and Deposit Water and Sewer Utilities 12 - 6 Refrigeration System Fire 7 - 20
Release of Stored Vehicles Police 10 -11
Remove and Dispose of Marker, Marker Frame, Plaque, Vase and Ring Parks and Recreation 9 - 6 Replacement Fee for Lost Link+ Materials Borrowed from Other Libraries Library 8 - 2 Replacement Fee for Lost or Damaged Library Card Library 8 - 1 Replacement for Library Materials Library 8 - 1
Replacement of Job Card Community Development 4 - 13
Replacement Permit Community Development 4 - 14
Repo Fee (Repossessed Vehicles) Police 10 - 12
Reposting of Public Notification Community Development 4 - 30 Residential Development Park Dedication In-Lieu Fees Parks and Recreation 9 - 25 Residential Loan Refinance/Subordinations All Programs Community Development 4 - 20 Residential Parking Permit Police 10 - 12
Residential Reroof Community Development 4 - 16
Residential Scaled Permit Community Development 4 - 16
Resource Fees Fire 7 - 4
Review of Agreements and Easements Engineering 11 - 8
Rezoning Community Development 4 - 27
Sanitary Sewer Capacity Model Run Engineering 11 - 11
Sanitary Sewer Conveyance Fee Engineering 11 - 10
13 - 9
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Sanitary Sewer Outlet Charge Engineering 11 - 9
Sanitize Crypt Parks and Recreation 9 - 7
Saturday Service Parks and Recreation 9 - 9
School Fire 7 - 49
Second Response Ordinance Police 10 - 12
Security Deposit for Survey Engineering 11 - 3
Senior Citizens Center Parks and Recreation 9 - 19
Service Disconnection Electric Utility 5 - 6
Service Fee Customer - Owned Equipment Problem Electric Utility 5 - 7 Service Reconnection Electric Utility 5 - 6
Service Removal Electric Utility 5 - 7
Service Turn-On Finance 6 - 10
Service Wire Relocation Electric Utility 5 - 4
Sewer Lateral Cleanout Water and Sewer Utilities 12 - 12 Sewer Lateral Installation Water and Sewer Utilities 12 - 12 Sewer Lateral Video Inspection Water and Sewer Utilities 12 - 13 Shared Mobility Permit and Impound Engineering 11 - 18
Significant Property Alteration Community Development 4 - 37 Signs Community Development 4 - 33
Single or Double Upright Monument Foundation Parks and Recreation 9 - 6 Single Story Buildings Fire 7 - 41
Smoke Control System Fire 7 - 21
Solar Domestic Hot Water System Installation Water and Sewer Utilities 12 - 15 Solar Domestic Hot Water System Panel Removal and Replacement Water and Sewer Utilities 12 - 15 Solar Photovoltaic System Fire 7 - 24
Solar Pool Heating System Installation Water and Sewer Utilities 12 - 15 Solar Pool Heating System Panel Removal and Replacement Water and Sewer Utilities 12 - 15 Solicitor/Peddler Police 10 - 12
Solid Waste Management Street 11 - 25
Special Event Application Parks and Recreation 9 - 22
Special Event Concessions Parks and Recreation 9 - 24
Special Event Sponsorship/Vendor Parks and Recreation 9 - 24 Special Events Structure Fire 7 - 23
Specific Plan Community Development 4 - 38
Standpipe Systems Fire 7 - 21
State of California Annual Surcharges Fire 7 - 58
13 - 10
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Storage or Refuse Bins on City Street Engineering 11 - 15 Storage Tanks - Hazardous Materials Fire 7 - 21
Storm Drain Outlet Charge Engineering 11 - 9
Storm Outlet Charge Engineering 11 - 9
Stormwater Management Plan Review Community Development 4 - 34 Stormwater Management Building and Planning Street 11 - 21 Street Tree Planting Street 11 - 24
Street Tree Removal Street 11 - 24
Subdivision Committee Review Engineering 11 - 16
Subpoena Fees Citywide 1 - 2
SVP System Impact Study Electric Utility 5 - 10
SVP Generation Interconnection Study Electric Utility 5 - 10 Tasman East Specific Plan Area Impact Engineering 11 - 14 Taxicab/Pedicab Company Police 10 - 13
Taxicab/Pedicab Driver Police 10 - 14
Technology Fee Citywide 1 - 2
Technology Fee (Building Fees) Community Development 4 - 2 Teen Center Room Rental Parks and Recreation 9 - 21
Temporary Certificate of Occupancy Community Development 4 - 13 Temporary Connection to Pole Electric Utility 5 - 4
Temporary Power Electric Utility 5 - 4
Temporary Sanitary Sewer Discharge Engineering 11 - 15
Temporary Wastewater Discharge Permit Water and Sewer Utilities 12 - 14 Tennis Reservations Parks and Recreation 9 - 20
Time Extensions Community Development 4 - 36
Time of Use Meter Installation Electric Utility 5 - 8
Tournament Parks and Recreation 9 - 23
Tow Drivers Police 10 - 15
Toxic Materials Fire 7 - 47
Traffic Flow Map Engineering 11 - 15
Traffic Impact Engineering 11 - 13
Traffic Sign Fabrication Street 11 - 23
Training Fire 7 - 1
Tree Removal Community Development 4 - 35
Underground - Existing Electric Utility 5 - 2
Underground - New Electric Utility 5 - 1
13 - 11
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Underground and Above Ground Tank Installations Fire 7 - 21 Underground and Above Ground Tank Modifications Fire 7 - 22 Underground and Above Ground Tank Removals Fire 7 - 22
Underground Fire Service Systems Fire 7 - 23
Underground Hazardous Materials Tank Fire 7 - 60
Underground Street Light Relocation Electric Utility 5 - 4 Unstable (Reactive) Materials Fire 7 - 47
USB Drive for Police Reports Police 10 - 15
Use Permits Community Development 4 - 29
Using Library Meeting Room Library 8 - 3
Utility Billing Splitting or Combining Accounts Finance 6 - 11 Utility Engineering Plan Review & Inspection Water and Sewer Utilities 12 - 7 Utility Service Deposit Finance 6 - 10
Variance Community Development 4 - 28
Vault Disposal Parks and Recreation 9 - 6
Verification of Electric Meter Address Finance 6 - 10
Wastewater Treatment Plant Capacity Water and Sewer Utilities 12 - 14 Water and Fire Service Tap Water and Sewer Utilities 12 - 9 Water Meter and Backflow Preventer Water and Sewer Utilities 12 - 3 Water Meter (Device Cost) Water and Sewer Utilities 12 - 3 Water Meter Test Water and Sewer Utilities 12 - 7
Water Reactive Materials Fire 7 - 47
Water Reconnection Water and Sewer Utilities 12 - 8
Water Service Water and Sewer Utilities 12 - 1
Water Service Abandonment Water and Sewer Utilities 12 - 8 Water Service Dual Meter Service Water and Sewer Utilities 12 - 2 Water Service Relocation Water and Sewer Utilities 12 - 9 Water Service Upgrade Excluding Device Cost Water and Sewer Utilities 12 - 11 Water Supply Assessment Preparation Water and Sewer Utilities 12 - 8 Watershed Map Engineering 11 - 6
Youth Activity Center Room Rental Parks and Recreation 9 - 19 Zoning Clearance Community Development 4 - 27
Zoning Code Text Amendment Community Development 4 - 27 Zoning Verification Community Development 4 - 34
13 - 12
Municipal Fee Schedule
Resolution

This page is intentionally left blank.

← All documents from this meeting