Resolution Sanitary Sewer Condition Assessment Repairs – Package 1 MND Page 1 of 3 Rev: 11/22/17
RESOLUTION NO. 23-9216
A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA,
ADOPTING A MITIGATED NEGATIVE DECLARATION, MAKING
FINDINGS WITH RESPECT THERETO, AND ADOPTING A
MITIGATION MONITORING AND REPORTING PROGRAM FOR
THE SANITARY SEWER CONDITION ASSESSMENT REPAIRS –
PACKAGE 1 PROJECT
SCH# 2022120288 (Mitigated Negative Declaration)
BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
WHEREAS, the City has proposed the Sanitary Sewer Condition Assessment Repairs – Package 1 Project (“Project”) which will construct sewer repairs at various locations; WHEREAS, in conformance with CEQA, the Mitigated Negative Declaration ( MND) was noticed and circulated for a 30-day public review period from December 14, 2022 to January 13, 2023 to the State Office of Planning and Research, Santa Clara County Clerk’s Office, and interested parties, and a Notice of Intent to Adopt the MND was published in the Santa Clara Weekly, a newspaper of general circulation, on December 14, 2022, where during that period comment letters were received from Valley Water; along with the attached Consideration of Comments Received on the MND are made part of the record;
WHEREAS, the City Council held a duly noticed public meeting on April 18, 2023 to consider the MND and Mitigation Monitoring and Reporting Program (“MMRP”); WHEREAS, the City Council reviewed the MND prepared for the Project, City staff reports pertaining to the MND and all evidence received at the duly noticed public meeting on April 18, 2023. All of these documents and evidence are herein incorporated by reference into this Resolution;
WHEREAS, all potentially significant environmental effects associated with the Project, as approved, can either be substantially lessened or avoided through the inclusion of mitigation measures proposed in the MND; and
//
Resolution Sanitary Sewer Condition Assessment Repairs – Package 1 MND Page 2 of 3 Rev: 11/22/17
WHEREAS, the City Council, in reviewing the Project as proposed, intends to adopt all mitigation measures set forth in the MND.
NOW THEREFORE, BE IT FURTHER RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
1. The City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.
2. The City Council hereby finds that the MND has been completed in compliance with CEQA.
3. The City Council hereby finds, pursuant to California Code of Regulations, Title 14, Section 15074, that the Council has reviewed and considered the information and analysis contained in the MND before making its determination, that there is no substantial evidence that the Project will have a significant effect on the environment, and that the MND reflects the Council’s independent judgment and analysis, and hereby adopts the MND.
4. The City Council hereby finds that the proposed mitigation measures described in the MND are feasible, and therefore will become binding upon the City and affected l andowners and their assigns or successors in interest when the Project is approved.
5. Pursuant to California Code of Regulations, Title 14, Section 15074(c), the City Council hereby designates the Director of Public Works as the Custodian of Records for the Project, and the Public Works Division at City Hall, 1500 Warburton Avenue, Santa Clara, California, is the location of the documents and other material that constitute the record of proceedings upon which this decision is based.
6. That the City Council authorizes the City Manager or his/her designee to File a Notice of Determination.
//
//
//
7. In order to comply with Public Resources Code Section 21081.6, the City Council hereby adopts the Mitigation Monitoring and Reporting Program (MMRP) as attached and referenced herein. The Program is designed to ensure that, during project implementation, the City, affected landowners, their assigns and successors in interest and any other responsible parties comply with the feasible mitigation measures identified. The MMRP identifies, for each mitigation measure, the party responsible for implementation.
8. Effective date. This resolution shall become effective immediately.
I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED
AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 18TH DAY OF APRIL, 2023, BY THE FOLLOWING VOTE:
AYES: COUNCILORS:
NOES: COUNCILORS:
ABSENT: COUNCILORS:
ABSTAINED: COUNCILORS:
Attachments incorporated by reference :
1. Mitigated Negative Declaration (MND)
2. Mitigation and Monitoring Reporting Program
Becker, Chahal, Hardy, Jain, Park, and Watanabe,
and Mayor Gillmor
None
None
None
ATTEST: ~
NORA PIMENTEL, MMC
ASSISTANT CITY CLERK
CITY OF SANTA CLARA
3. Consideration of Comments Received on the Mitigated Negative Declaration Resolution Sanitary Sewer Condition Assessment Repairs - Package 1 MND Rev: 11 /22/17
California Environmental Quality Act (CEQA)
Mitigated Negative Declaration
Redtail Consulting Environment & Community MND-1
Project Title & Contact Information
Project title: Sanitary Sewer Condition Assessment Repairs – Package 1 Lead agency name and address: City of Santa Clara
Public Works Department
1500 Warburton Avenue
Santa Clara, CA 95050
Project proponent name and address: Same as above
Contact person and phone number: Vincent Luchessi, PE
Senior Civil Engineer
408.615.3012
Project Location & Description
The attached Initial Study analyzes the environmental effects of five projects under the current phase of the City’s annual sanitary sewer repairs program, as follows:
x Segment 100, located in Mathew Street west of De La Cruz Boulevard: remove 166 linear feet (lf) of existing 18-inch-diameter VCP sewer line and replace it with 18-inch-diameter polyvinyl chloride (PVC) sewer line; remove and replace sanitary sewer manhole (SSMH) 57-35 at west terminus of Segment
x Segment 231, located in a utility easement that crosses Lafayette Street just south of Highway 237:
install 278 lf of cured-in-place-pipe (CIPP) lining in existing 42-inch-diameter reinforced concrete pipe (RCP) sewer line; replace cones of SSMH 114-14 and SSMH 114-23 at termini of Segment x Segments 232 and 233, located within Lafayette Street immediately to the south of Segment 231: at Segment 232, install 437 lf of CIPP lining in existing 42-inch-diameter RCP sewer line, replace cone of SSMH 104-9 at south terminus of Segment; at Segment 233, install 491 lf of CIPP lining in existing 42-inch-diameter RCP sewer line; replace cone of SSMH 104-15 at south terminus of Segment
x Segment 242, located within Lafayette Street north of Tasman Drive: install 430 lf of CIPP lining in existing 42-inch-diameter RCP sewer line; replace cones of SSMH 104-17 and SSMH 104-22 at termini of Segment
Figures 1 and 2 show the locations of the projects.
+
+
+
5HGWDLO&RQVXOWLQJ
(QYLURQPHQW &RPPXQLW\
1 )LJXUH/RFDWLRQRI6HJPHQW
3URSRVHG01'
6DQLWDU\6HZHU&RQGLWLRQ$VVHVVPHQW5HSDLUV²3DFNDJH &LW\RI6DQWD&ODUD
$HULDO3KRWRJUDSK6RXUFH
*RRJOH(DUWK
LPDJHU\GDWH
GRZQORDGHG
)RULOOXVWUDWLRQRQO\
ORFDWLRQVQRWVXUYH\HG
)((7
6HJPHQW
'H/D&UX]%RXOHYDUG
0DWKHZ6WUHHW
5REHUW$YHQXH
0DUWLQ$YHQXH
0DUWLQ$YHQXH
5HHG6WUHHW
5HHG6WUHHW
0DWKHZ6WUHHW
8355$OLJQPHQW
1RUPDQ<0LQHWD
6DQ-RVp,QWHUQDWLRQDO
$LUSRUW
660+ 660+
))((7
$HULDO3KRWRJUDSK6RXUFH
*RRJOH(DUWK
LPDJHU\GDWH
GRZQORDGHG
)RULOOXVWUDWLRQRQO\
ORFDWLRQVQRWVXUYH\HG
)LJXUH/RFDWLRQRI6HJPHQWV²DQG
3URSRVHG01'
6DQLWDU\6HZHU&RQGLWLRQ$VVHVVPHQW5HSDLUV²3DFNDJH &LW\RI6DQWD&ODUD
5HGWDLO&RQVXOWLQJ
(QYLURQPHQW &RPPXQLW\
1 6HJPHQW
660+
6HJPHQW
6HJPHQW
660+
660+
660+
6HJPHQW
660+
660+
(DVWVLGH
5HWHQWLRQ
%DVLQ
6DQWD&ODUD
3$/%0;7UDFN
)RUPHU
6DQWD&ODUD
*ROI 7HQQLV&OXE
&RXUVH
)RUPHU
6DQWD&ODUD
*ROI 7HQQLV&OXE
&RXUVH
)RUPHU
6DQWD&ODUD
*ROI 7HQQLV&OXE
&RXUVH
6WDWH5RXWH
*XDGDOXSH5LYHU
/DID\HWWH6WUHHW
6WDUVDQG6WULSHV'ULYH
<HUED%XHQD:D\
&DOOHGHO0XQGR
$PHUHVFR
&RJHQHUDWLRQ
)DFLOLW\
Mitigated Negative Declaration Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 City of Santa Clara
MND-2 Redtail Consulting
Environment & Community
Avoidance &
Minimization
Measures:
The City has committed to the following Avoidance and Minimization Measures (AMMs) to reduce the environmental effects of the repairs. Incorporation of these AMMs was considered in evaluating the projects’ environmental impacts.
Dust Control
To reduce dust generation, the following measures will be required during excavation and ground disturbance. These measures reflect the requirements of the Bay Area Air Quality Management District’s (BAAQMD’s) Best Management Practices (BMPs) for fugitive dust control (Bay Area Air Quality Management District 2017). x All exposed surfaces (potentially including contractor parking areas, staging areas, areas subject to excavation or other ground disturbance, and unpaved access roads/routes) and soil stockpiles will be watered 2 times per day x All haul trucks transporting soil, sand, or other loose material offsite will be covered x All visible mud or dirt track-out onto adjacent public roads will be removed using wet power vacuum street sweepers at least once per day. Use of dry power sweeping will be prohibited
x All vehicle speeds in unpaved areas will be limited to 15 miles per hour x If pavement is removed, it will be replaced as soon as possible. x Vegetated areas disturbed during construction will be replanted/reseeded as soon as possible
x Project signage will include the name and telephone number of City staff to contact regarding dust complaints. City staff will respond and take corrective action within 48 hours. Project signage will also include the BAAQMD’s phone number to ensure compliance with applicable regulations
Emissions Control
x Idling times will be minimized, either by shutting equipment off when not in use or by reducing the maximum idling time to 5 minutes. Clear notification will be provided to all equipment operators regarding limitation on idling times x All construction equipment will be maintained and properly tuned in accordance with manufacturer specifications. All equipment will be checked by a certified mechanic and determined to be running in proper condition prior to operation Reference Cited
Bay Area Air Quality Management District. 2017. California Environmental Quality Act Air Quality Guidelines. (May.) Available: http://www.baaqmd.gov/~/media/files/planning- and-research/ ceqa/ceqa_guidelines_may2017-pdf.pdf?la=en. Downloaded: December 2017.
Sanitary Sewer Condition Assessment Repairs – Package 1 Mitigated Negative Declaration City of Santa Clara March 2023
Redtail Consulting Environment & Community MND-3
Mitigation
Measures:
Based on analysis in the attached Initial Study, the proposed repair projects will incorporate the following mitigation measures to avoid, reduce, or compensate for potentially significant environmental impacts.
Air Quality
Mitigation Measure AIR-1. Toxic Air Contaminant and Odor Control If feasible, the City will avoid the use of styrene resins for CIPP lining.
If the use of styrene resins cannot feasibly be avoided, the City will require the following measures to reduce the potential for exposure to toxic air contaminants during CIPP lining. x All use of styrene resins will be required to adhere to the standard best practices in NASSCO’s Guideline for the Safe Use and Handling of Styrene-Based Resins in Cured-in-Place Pipe (National Association of Sewer Service Companies 2020 or most current)
x Sewer main reaches to be rehabilitated via CIPP will be plugged at both ends prior to lining, and a vent will be provided at each end of the reach to provide better dispersal of vapors
x If steam curing is used, the steam exhaust will be located at least 250 feet from commercial/business park entry areas and all heating, ventilation, and air conditioning system air intakes. If this is not feasible, an alternative curing method will be used
x Adjacent facilities will be notified in writing at least 1 week prior to the start of work.
Notification will include the following information.
- Anticipated work dates
- An overview of the repair process, including the substances proposed for use
- Instructions to leave the premises, move farther away from the work area if possible, and contact the Santa Clara Fire Department if vapors or odors have entered the building, along with the appropriate Fire Department contact information
- An advisory to seek medical attention promptly if exposure is suspected - A request to report any odor or health concerns to the City - The name, phone number, and email address of the City staff member who will be responsible for answering questions and receiving and responding to reports of odors or health concerns
Additionally, to enable further assessment of potential concerns, the City will document any calls received regarding odors or health symptoms, and if health symptoms are reported will conduct indoor air monitoring following a standard protocol appropriate to the type of resin and curing method(s) being used. Results of monitoring will be documented in City files for consideration in planning future projects. If monitoring indicates levels of any CIPP-related I!
Mitigated Negative Declaration Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 City of Santa Clara
MND-4 Redtail Consulting
Environment & Community
emissions of any toxic air contaminant above applicable health thresholds, the City will take appropriate action to reduce the potential for exposure.
Biological Resources
Mitigation Measure BIO-1. Protection of Nesting Birds (General), All Segments If feasible, all project-related activity within 300 feet of the proposed repair Segments will be scheduled between September 1 and January 31, outside the February 1 – August 31 nesting period.
If project-related activity at any Segment occurs during the nesting period, the City will retain a qualified biologist to conduct a preconstruction nesting bird survey covering the Segment footprint and a 300-foot-wide surrounding buffer. The survey will be conducted within 2 weeks of the start of construction-related activity at the Segment. If active nest(s) of any protected species are identified within the 300-foot-wide survey area, a no-activity buffer will be established around the nest for the duration of the nesting season, or until a biologist determines the young have fledged and left the nest, or that the nest has been abandoned.
No entry into the no-activity buffer will be permitted. The no-activity buffer will be delineated in the field by or under the supervision of the biologist, using temporary construction fencing or another suitable low-impact medium. The width of the buffer will be determined by the biologist, based on the species involved, the amount of vegetative and other screening between the nest and areas where construction activity will take place, and, if appropriate, other site-specific factors. If special-status species are involved, the biologist will consult with the appropriate resource agency(ies) (California Department of Fish and Wildlife and/or U.S.
Fish and Wildlife Service) in determining the width of the buffer.
Mitigation Measure BIO-2. Protection of Nesting Burrowing Owl, Segments 231 and 232
If repair work at Segment 231 or Segment 232 occurs during the Western Burrowing Owl nesting season (February 1 – August 31), the City will retain a qualified biologist to conduct preconstruction surveys covering all areas of suitable habitat within 250 feet of the Segment.
The survey will last a minimum of 3 hours, and will either begin 1 hour before sunrise and continue until 2 hours after sunrise or begin 2 hours before sunset and continue until 1 hour after sunset. If no owls are detected during a first survey, a second survey will be conducted.
If owls are detected during the first survey, a second survey is not needed. All owls observed will be counted and their locations will be mapped.
If evidence of nesting Western Burrowing Owls is found, a 250-foot-wide no-disturbance buffer zone will be established around each occupied nest and will be delineated in the field by the biologist, using a suitable low-impact medium. Construction may proceed outside the no-disturbance buffer zones.
Sanitary Sewer Condition Assessment Repairs – Package 1 Mitigated Negative Declaration City of Santa Clara March 2023
Redtail Consulting Environment & Community MND-5
Cultural Resources
Mitigation Measure CUL-1. Notice of Potential for Buried Cultural Resources in Construction Documents
The potential to encounter buried cultural resources, including Native American burials, will be noted in the project construction documents.
Mitigation Measure CUL-2. Retention of On-Call Archaeologist Prior to construction, the City will retain a qualified professional archaeologist (City’s Archaeologist) with experience in northern and central California archaeology on an on-call basis for the duration of all ground-disturbing activities. The City’s Archaeologist will be responsible for reviewing, identifying, and evaluating cultural resources (if any) exposed during construction, for determining whether they qualify as unique archaeological resource(s) under CEQA, and, if needed, recommending and implementing appropriate follow-up treatment.
Mitigation Measure CUL-3. Worker Awareness Training for Archaeological Resources Prior to groundbreaking at each of the Segments, the City’s Archaeologist (defined in Mitigation Measure CUL-2) will develop and present in-person, hands-on worker awareness training for archaeological resources. Training will include information on the possibility of encountering resources during construction; the types of resources that may be seen and how to recognize them; and proper procedures in the event resources are encountered. All field management and supervisory personnel and construction workers involved with ground- disturbing activities will be required to take this training prior to beginning work on the project.
Upon completion of the training, workers will be required to sign a form stating that they attended the training, understand, and will comply with the information presented.
Mitigation Measure CUL-4. Evaluation and Treatment of Unanticipated Archaeological Discoveries
If known or suspected archaeological resources are discovered during construction, work in the immediate area of the find will cease and the contractor will be required to notify the City before the end of the work day. The find will be protected in place until the City’s Archaeologist has evaluated it and identified appropriate follow-up measures, if any. If the City’s Archaeologist determines that the resource qualifies as a unique archaeological resource under CEQA, they will notify the City and other appropriate parties and recommend follow-up measures to reduce impacts, in accordance with Section 15064.5 of the CEQA Guidelines. Depending on the nature of the find, follow-up measures may include avoidance, preservation in place, recordation, monitoring during ongoing work, additional archaeological testing, and data recovery, among other options. The City’s Archaeologist may recommend completion of a formal Archaeological Monitoring Plan (AMP) and/or Archaeological Treatment Plan (ATP), potentially including data recovery, if significant archaeological deposits are exposed during ground-disturbing activities. The City will be responsible for proper implementation of the AMP and ATP. If archaeological evaluation, monitoring, or treatment is required, the City’s Archaeologist will prepare and file a Monitoring Closure Report with the City, documenting the nature of the find(s), evaluation methods, and outcomes.
I!
Mitigated Negative Declaration Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 City of Santa Clara
MND-6 Redtail Consulting
Environment & Community
Mitigation Measure CUL-5. Procedures for Discovery of Human Remains The treatment of human remains and funerary objects discovered during any project related ground-disturbing activity will comply with all applicable state laws. If known or potential human remains are encountered during project-related activities, work within 50 feet of the discovery and in any nearby areas reasonably suspected to overlie adjacent remains will cease, the find will be protected in place, and the contractor will be required to notify the City before the end of the work day. The City will promptly notify the Santa Clara County Coroner, who will be responsible for determining whether the remains are Native American. If the Coroner determines that the remains are Native American and are not subject to their authority, they will notify the Native American Heritage Commission, which is responsible for identifying and notifying descendant(s) of the deceased so they can make recommendations regarding the treatment of the remains. The City will be responsible for facilitating the disposition of remains recommended by the Most Likely Descendant(s). If no satisfactory agreement can be reached as to the disposition of the remains pursuant to state law, the City will respectfully reinter the human remains and items associated with the burial on City property in a location not subject to further subsurface disturbance. A final report detailing the find, follow-up activities, and disposition of remains will be prepared by the City’s Archaeologist or other qualified staff, and will be submitted to the City’s Director of Community Development promptly following disposition of the remains. The report will be subject to review and approval by the City’s Director of Community Development.
Geology & Soils
Mitigation Measure GEO-1. Worker Awareness Training for Paleontological Resources Prior to groundbreaking, the City will retain qualified staff to develop and present in-person, hands-on worker awareness training for paleontological resources. As used here, qualified staff refers to an individual who satisfies one or both of the following criteria. x A Principal Paleontologist as defined by the Society of Vertebrate Paleontology (Society of Vertebrate Paleontology Impact Mitigation Guidelines Revision Committee 2010), who is experienced in delivering training to nonspecialists x A California-licensed professional geologist (PG) who has expertise in South San Francisco Bay Area stratigraphy and paleontology and is experienced in delivering training to nonspecialists
Training will be concise and substantive. It will include information on the possibility of encountering fossils during construction; the types of fossils that may be seen and how to recognize them; and proper procedures in the event fossils are encountered. All field management and supervisory personnel and construction workers involved with ground- disturbing activities will be required to take this training prior to beginning work on the project.
Upon completion of the training, workers will be required to sign a form stating that they attended the training, understand, and will comply with the information presented.
Mitigation Measure GEO-2. Stop-Work, Evaluation, and Treatment in the Event of a Paleontological Find
If vertebrate remains or other potentially significant fossil resources are discovered during project-related activities, all work in the immediate vicinity of the discovery will cease, the find Sanitary Sewer Condition Assessment Repairs – Package 1 Mitigated Negative Declaration City of Santa Clara March 2023
Redtail Consulting Environment & Community MND-7
will be protected in place, and the contractor will be required to notify the City before the end of the work day. The City will detail qualified staff—i.e., staff meeting the criteria for a Qualified Professional Paleontologist as defined by the Society of Vertebrate Paleontology (Society of Vertebrate Paleontology Impact Mitigation Guidelines Revision Committee 2010)—to evaluate the find and recommend appropriate follow-up treatment. Work may continue on other parts of the alignment while evaluation (and, if needed, treatment) takes place, as long as the find can be adequately protected in the judgment of the qualified staff.
The City will be responsible for ensuring that the recommendations of the qualified staff regarding treatment and reporting are implemented.
Hazards & Hazardous Materials
Mitigation Measure HAZ-1. Contaminated Groundwater, Soil, and Soil Vapor Protection The contractor will be required to prepare and submit a Health and Safety Plan (HASP) for worker and public safety during all phases of sewer and manhole repair work. The HASP will be tailored to the contaminants potentially present, the media potentially affected/involved (soil, groundwater, soil vapor), and the activities planned. The HASP will be subject to review and approval by a Certified Industrial Hygienist and the City, and at a minimum will include the following requirements.
x Contractor staff will be required to wear appropriate Personal Protective Equipment (PPEs) and the contractor will be required to employ Best Management Practices (BMPs) to minimize and monitor human exposure to potential contaminants, consistent with applicable federal and state requirements, including Title 29 of the Code of Federal Regulations and California Department of Industrial Relations, Division of Occupational Safety and Health (Cal/OSHA) guidelines (California Code of Regulations, Title 8). Construction BMPs described in the HASP will include, but will not necessarily be limited to, the following
x Public access to the active work site will be prohibited using appropriate safety barriers and signage
x If contaminated soil, groundwater, or other materials encountered during construction activities qualify as hazardous waste (per California Code of Regulations, Title 22), all contractor employees (and subcontractors, if any) handling the hazardous waste will be certified in OSHA’s 40-hour Hazardous Waste Operations and Emergency Response (HAZWOPER) training
x If dewatering is required, groundwater removed from excavations will be stored in a settling tank and tested onsite for contamination prior to discharge in accordance with applicable permit requirements. If contaminant levels are detected in excess of the applicable discharge limits per the contractor’s discharge permit, the groundwater will either be treated onsite using appropriate technology (e.g., sediment filter, activated carbon filter, or other appropriate alternative methods) prior to discharge to the sanitary sewer, or will be removed from the site for appropriate offsite disposal. Groundwater treatment and offsite disposal options will be described in the HASP
I!
Mitigated Negative Declaration Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 City of Santa Clara
MND-8 Redtail Consulting
Environment & Community
x Contractor will stockpile excavated materials prior to onsite reuse as backfill or offsite disposal at an appropriately permitted landfill. Contractor will water/mist soil as it is being excavated. Stockpiled soil will be placed in areas shielded to the extent feasible from prevailing winds and will be covered with plastic sheeting to prevent fugitive dust and vapor emissions and to shield the stockpile from potential rain.
Stockpiles will be placed away from drainage courses, gutters, and stormdrain inlets to prevent contact with stormwater runoff. Public access to the stockpile area(s) will be prohibited using appropriate barriers and signage. Soil exhibiting signs of potential contamination (such as staining, odors, or the presence of debris) will be placed in a separate stockpile
x Soil that does not exhibit signs of potential contamination may be reused as backfill in the excavation from which it was removed
x Excavated materials that exhibit signs of potential contamination, and excavated materials that are planned for offsite disposal at a landfill (if any), will be tested for contaminants in accordance with the receiving landfill’s requirements and the U.S.
Environmental Protection Agency’s (EPA’s) SW-846 guidelines (available:
https://www.epa.gov/hw-sw846)
x If testing of excavated materials indicates any contaminant levels in excess of hazadous waste thresholds (per California Code of Regulations, Title 22), excavated materials will be handled and disposed of by a licensed hazardous waste disposal contractor and transported by a licensed hazardous waste hauler to an appropriately licensed and permitted disposal facility, in accordance with local, state, and federal requirements. Contractor will water/mist soil as it is being loaded onto haul trucks to prevent fugitive dust generation, and haul trucks will be covered and the truck wheels and body brushed clean to control trackout, fugitive dust, and vapor emissions during transport
x If import fill materials (e.g., soil, sand, aggregate base) are used, they will be sourced and tested in accordance with guidance from the California Department of Toxic Substances Control’s Information Advisory Clean Imported Fill Material (available: https://dtsc.ca.gov/information-advisory-clean-imported-fill-material-fact- sheet/). Fill material testing results will be provided to the City for review and approval prior to importing the fill materials to the project site. No fill material will be imported for use at any of the repair Segments if it contains any contaminant at a level exceeding hazardous waste thresholds (per California Code of Regulations, Title 22) or the applicable Regional Water Quality Control Board (RWQCB) Environmental Screening Level (ESL) for commercial/industrial land use, with the exception of arsenic for which the naturally ocurring background level of 11 milligrams per kilogram (mg/kg) (per Duvergé 2011) will apply as a limiting threshold x The contractor will monitor ambient air in the trench and around the perimeter of the active work area for fugitive vapor emissions, including volatile organic compounds (VOCs), methane, and other sewer/landfill gases, using appropriate field screening instrumentation. If any contaminant level in excess of applicable Cal/OSHA Permissible Exposure Levels is detected, worker PPEs will be required to include inhalation protection meeting Cal/OSHA standards, and/or work will be suspended Sanitary Sewer Condition Assessment Repairs – Package 1 Mitigated Negative Declaration City of Santa Clara March 2023
Redtail Consulting Environment & Community MND-9
until airborne concentrations decrease below the action threshold, as verified by ambient air monitoring. If air monitoring indicates the presence of flammable vapors in excess of their lower explosive limits (LELs) or other hazardous atmosphere conditions (e.g., oxygen-deficient atmosphere) work will be suspended until the hazardous atmosphere conditions have been mitigated as verified by air monitoring.
Vapor control measures (e.g., spraying water or vapor supressants, covering exposed soil with plastic sheeting, and ventilation of excavations and manholes) will be performed as necessary based on air monitoring results, to maintain vapor concentrations below PELs and LELs and ensure that safe oxygen levels (20.8% 21%) are present in the trench and surrounding work area The project Contract Documents will stipulate contractor responsibilities in implementing these requirements.
References Cited
Duvergé, D. 2011. Establishing Background Arsenic in Soil of the Urbanized San Francisco Bay Region, December. Available:
https://www.waterboards.ca.gov/sanfranciscobay/water_issues/ available_documents/2011_Arsenic_Background_Duverge.pdf. Accessed: May – June 2022.
National Association of Sewer Service Companies. 2020. Guideline for the Safe Use and Handling of Styrene-Based Resins in Cured-in-Place Pipe. (October.) Available:
https://www.nassco.org/wp-content/uploads/2021/02/Safe-Handling-and-Use-of- Styrene_Specification-Guideline-_-2020-2.pdf. Downloaded: October 2022.
Society of Vertebrate Paleontology Impact Mitigation Guidelines Revision Committee. 2010.
Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources. Available: http://vertpaleo.org/Membership/Member- Resources/SVP_Impact_Mitigation_Guidelines.aspx. Downloaded: July 2018.
Determination
In accordance with local procedures for compliance with the California Environmental Quality Act (CEQA), the Public Works Department has completed the attached Initial Study to evaluate the potential for the proposed sanitary sewer repairs to result in significant adverse effect(s) on the environment, and on the basis of analysis in the Initial Study recommends the following determination. x Although the projects have the potential to result in significant effects on the environment, there would not be a significant effect in this case because revisions in the project (in the form of mitigation measures) have been agreed to by the City as project proponent x A Mitigated Negative Declaration should be prepared
x An Environmental Impact Report (EIR) is not required
I!
Mitigated Negative Declaration Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 City of Santa Clara
MND-10 Redtail Consulting
Environment & Community
Findings
Based on the analysis and findings presented in the project Initial Study (attached), implementation of the proposed sanitary sewer repairs will not have a significant effect on the environment, for the following reasons. x As discussed in Section 3 of the Initial Study, with the identified Avoidance and Minimization Measures and mitigation measures incorporated, potential short- and long-term environmental impacts would be avoided or reduced to Less than Significant levels
x The proposed repair projects would not substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of the major periods of California history or prehistory
x The proposed repair projects would not make Cumulatively Considerable contributions to existing Significant cumulative impacts, nor would they individually or collectively create new Significant cumulative impacts over time. Thus, they would not have impacts that are individually limited, but Cumulatively Considerable
x The proposed repair projects would not result in environmental effects that would cause substantial adverse effects on human beings, either directly or indirectly This determination reflects the independent judgment of the City.
Vincent Luchessi, PE
Senior Civil Engineer
Date
5HGWDLO&RQVXOWLQJ
(QYLURQPHQW &RPPXQLW\
6DQLWDU\6HZHU&RQGLWLRQ$VVHVVPHQW5HSDLUV±3DFNDJH 0DUFK
6HJPHQW
660+
6HJPHQW
6HJPHQW
660+
660+
660+
6HJPHQW
660+
660+
6WDWH5RXWH
/D
ID\HWWH
6WUHH
W
0RQLWRULQJ 5HSRUWLQJ3URJUDP
City of
Santa Clara
The Center of What 's Possible
Sanitary Sewer Condition Assessment Repairs – Package 1 Monitoring & Reporting Program
(including AMMs & CEQA Mitigation Measures)
March 2023
Prepared for:
City of Santa Clara Public Works Department
1500 Warburton Avenue
Santa Clara, CA 95050
Contact: Vincent Luchessi, PE
Phone: 408.615.3012
Prepared by:
Redtail Consulting
115 Orchard Drive
Fremont, CA 94536
Contact: Anna Buising, PhD, PG
Phone: 510.304.8363
City of
Santa Clara
The Center of What's Possible
i
Contents
Sections
Introduction ........................................................................................................................................................ iii Summary of Adopted Environmental Measures ................................................................................. follows iv
1. Advance Preparation ....................................................................................................................................... 1
2. Avoidance & Minimization Measures ............................................................................................................. 3 Dust Control ................................................................................................................................................ 3 Emissions Control ....................................................................................................................................... 4
3. Mitigation Measures ........................................................................................................................................ 5 AIR-1. Toxic Air Contaminant and Odor Control ......................................................................................... 5 BIO-1. Protection of Nesting Birds (General), All Segments ....................................................................... 7 BIO-2. Protecting of Nesting Burrowing Owl, Segments 231 and 232 ........................................................ 9 CUL-1. Notice of Potential for Buried Cultural Resources in Construction Documents ............................. 11 CUL-2. Retention of On-Call Archaeologist ............................................................................................... 12 CUL-3. Worker Awareness Training for Cultural Resources ..................................................................... 13 CUL-4. Evaluation and Treatment of Unanticipated Archaeological Discoveries ...................................... 14 CUL-5. Procedures for Discovery of Human Remains .............................................................................. 15 GEO-1. Worker Awareness Training for Paleontological Resources ........................................................ 16 GEO-2. Stop-Work, Evaluation, and Treatment in the Event of a Paleontological Find ............................ 17 HAZ-1. Contaminated Groundwater, Soil, and Soil Vapor Protection ....................................................... 18
4. References & Standards Cited in this Document ....................................................................................... 21 Figures
Figure 1. Location of Segment 100 ........................................................................................................... follows iv Figure 2. Location of Segments 231 – 233 and 242 .................................................................................. follows iv
ii
This page deliberately left blank.
iii
Introduction
This document constitutes the Monitoring and Reporting Program adopted by the City of Santa Clara (City) pursuant to the California Environmental Quality Act (CEQA) for non-exempt projects in the first construction package of the 2021 – 2023 Sanitary Sewer Condition Assessment Repairs Program (Sanitary Sewer Condition Assessment Repairs – Package 1). It includes the measures incorporated into the projects to avoid or prevent significant environmental impacts—referred to as Avoi dance and Minimization Measures or AMMs—as well as additional Mitigation Measures identified and adopted through the CEQA review process.
The non-exempt projects in Sanitary Sewer Condition Assessment Repairs – Package 1 include the following.
Locations are shown in Figures 1 and 2.
x At Segment 100, in Mathew Street west of De La Cruz Boulevard: open-cut removal of 166 linear feet (LF) of existing 18-inch-diameter vitrified clay pipe (VCP) sewer line and replacement with 18-inch- diameter polyvinyl chloride (PVC) sewer line; removal and replacement of sanitary sewer manhole (SSMH) 57-35 at west terminus of Segment
x At Segment 231, in a utility easement crossing Lafayette Street just south of Highway 237: installation of 278 LF of cured-in-place-pipe (CIPP) lining in existing 42-inch-diameter reinforced concrete pipe (RCP) sewer line; replacement of manhole cones at SSMH 114-14 and SSMH 114-23 at the termini of the Segment
x At Segment 232, in Lafayette Street immediately south of Segment 231: installation of 437 LF of CIPP lining in existing 42-inch-diameter RCP sewer line; replacement of manhole at SSMH 104-9 at the south terminus of the Segment
x At Segment 233, in Lafayette Street south of Segment 232: installation of 491 LF of CIPP lining in existing 42-inch-diameter RCP sewer line; replacement of manhole cone at SSMH 104-15 at the south terminus of the Segment
x At Segment 242, in Lafayette Street north of Tasman Drive: installation of 430 LF of CIPP lining in existing 42-inch-diameter RCP sewer line; replacement of manhole cones at SSMH 104-17 and SSMH 104-22 at the termini of the Segment
The remaining repairs in Package 1 were screened for project details and environmental constraints, and found to qualify for either statutory or categorical exemption from CEQA (Redtail Consulting 2021a, 2021b).
The City circulated a CEQA Initial Study (IS) analyzing the environmental effects of conducting the non-exempt Package 1 repairs listed above in December 2022, and adopted a Mitigated Negative Declaration (MND) for the projects on April 18, 2023. When a public agency adopts an MND, Section 15097 of the state’s CEQA Guidelines requires that the agency also adopt a program for monitoring or reporting on the implementation of the measures it will require to mitigate potentially significant effects. This document, also adopted by the City on April 18, 2023, satisfies that requirement.
E Redtail Consulting
- Environment & Community
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
iv
In addition to this Introduction, this document contains the following components. x A summary matrix listing all adopted environmental measures (AMMs and mitigation) x Section 1—identifying preparatory actions that will need to be completed in advance of commencing construction, in order to support efficient implementation of the AMMs and Mitigation Measures x Section 2—detailing the AMMs “build into” the projects: actions required, timing, responsibility, and performance standard(s)
x Section 3—detailing the Mitigation Measures identified through CEQA review: actions required, timing, responsibility, and performance standard(s)
Throughout this document, the following abbreviations are used. x Contractor – contractor retained to perform repairs
x City PM – City’s construction Project Manager
x Inspector – City’s Inspector
x PW Director – City Public Works Director
I'!... Redtail Consulting Ill Environment & Community
5HGWDLO&RQVXOWLQJ
(QYLURQPHQW &RPPXQLW\
1 )LJXUH/RFDWLRQRI6HJPHQW
6DQLWDU\6HZHU&RQGLWLRQ$VVHVVPHQW5HSDLUV²3DFNDJH0RQLWRULQJ 5HSRUWLQJ3URJUDP &LW\RI6DQWD&ODUD
$HULDO3KRWRJUDSK6RXUFH
*RRJOH(DUWK
LPDJHU\GDWH
GRZQORDGHG
)RULOOXVWUDWLRQRQO\
ORFDWLRQVQRWVXUYH\HG
)((7
6HJPHQW
'H/D&UX]%RXOHYDUG
0DWKHZ6WUHHW
5REHUW$YHQXH
0DUWLQ$YHQXH
0DUWLQ$YHQXH
5HHG6WUHHW
5HHG6WUHHW
0DWKHZ6WUHHW
8355$OLJQPHQW
1RUPDQ<0LQHWD
6DQ-RVp,QWHUQDWLRQDO
$LUSRUW
660+ 660+
))((7
$HULDO3KRWRJUDSK6RXUFH
*RRJOH(DUWK
LPDJHU\GDWH
GRZQORDGHG
)RULOOXVWUDWLRQRQO\
ORFDWLRQVQRWVXUYH\HG
)LJXUH/RFDWLRQRI6HJPHQWV²DQG
6DQLWDU\6HZHU&RQGLWLRQ$VVHVVPHQW5HSDLUV²3DFNDJH0RQLWRULQJ 5HSRUWLQJ3URJUDP &LW\RI6DQWD&ODUD
5HGWDLO&RQVXOWLQJ
(QYLURQPHQW &RPPXQLW\
1 6HJPHQW
660+
6HJPHQW
6HJPHQW
660+
660+
660+
6HJPHQW
660+
660+
(DVWVLGH
5HWHQWLRQ
%DVLQ
6DQWD&ODUD
3$/%0;7UDFN
)RUPHU
6DQWD&ODUD
*ROI 7HQQLV&OXE
&RXUVH
)RUPHU
6DQWD&ODUD
*ROI 7HQQLV&OXE
&RXUVH
)RUPHU
6DQWD&ODUD
*ROI 7HQQLV&OXE
&RXUVH
6WDWH5RXWH
*XDGDOXSH5LYHU
/DID\HWWH6WUHHW
6WDUVDQG6WULSHV'ULYH
<HUED%XHQD:D\
&DOOHGHO0XQGR
$PHUHVFR
&RJHQHUDWLRQ
)DFLOLW\
Sanitary Sewer Condition Assessment Repairs – Package 1 Summary of Adopted Environmental Measures
S-1
Measure See Page1 Implementation Timing2 Advance Prep?3 Avoidance and Minimization Measures
Dust Control 3 x Design phase (requirements
included in construction
documents)
x During construction
(implementation)
Yes
Emissions Control 4 x Design phase (requirements
included in construction
documents)
x During construction
(implementation)
Yes
Mitigation Measures
AIR-1. Toxic Air Contaminant and
Odor Control
5 x During project planning (styrene
avoidance if feasible)
x Prior to construction (noticing)
x During construction (additional
measures)
Yes
BIO-1. Protection of Nesting Birds
(General), All Segments
7 x During project planning
(scheduling)
x Prior to construction (surveys)
x During construction (if needed,
avoidance)
Yes
BIO-2. Protection of Nesting
Burrowing Owl, Segments 231
and 232
9 x Prior to construction (surveys)
x During construction (if needed,
avoidance)
Yes
CUL-1. Notice of Potential for
Buried Cultural Resources in
Construction Documents
11 x Design phase No
CUL-2. Retention of On-Call
Archaeologist
12 x Prior to construction Yes
1 For details (actions required, implementation/oversight responsibility, performance standards), see referenced pages. 2 Measures that include pre-construction requirements are highlighted in orange. 3 For advance preparation needed to efficiently implement AMMs and Mitigation Measures, see Section 1.
City of
Santa Clara
The Center of What's Possible
E Redtail Consulting
- Environment & Community
-
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1 S-2
Measure See Page1 Implementation Timing2 Advance Prep?3 CUL-3. Worker Awareness
Training for Archaeological
Resources
13 x At construction start-up, prior to
groundbreaking
Yes
CUL-4. Evaluation and Treatment
of Unanticipated Archaeological
Discoveries
14 x During construction Yes
CUL-5. Procedures for Discovery
of Human Remains
15 x During construction Yes
GEO-1. Worker Awareness
Training for Paleontological
Resources
16 x At construction start-up, prior to
groundbreaking
Yes
GEO-2. Stop-Work, Evaluation,
and Treatment in the Event of a
Paleontological Find
17 x During construction Yes
HAZ-1. Contaminated
Groundwater, Soil, and Soil Vapor
Protection
18 x Design phase (contractor
responsibilities identified in
construction documents)
x Prior to construction (HASP
development)
x During construction (HASP
implementation)
Yes
+
..
I-
..
I-
~ Redtail Consulting
- Environment & Community
1 1
Advance Preparation
The following advance steps will be needed to implement the adopted AMMs and Mitigation Measures. x During the design phase: incorporation of AMM requirements into construction documents - Dust Control AMM (page 3)
- Emissions Control AMM (page 4)
x During the design phase: incorporation of mitigation requirements into construction documents - Adherence to NASSCO guidelines for use of styrene resins and other requirements of Mitigation Measure AIR-1 (page 5)
- Observance of no-activity/no-disturbance buffers around active nesting sites, per Mitigation Measures BIO-1 and BIO-2 (pages 7 and 9)
- Notice of potential to encounter buried cultural resources (Mitigation Measure CUL-1, page 11) - Compliance with worker awareness training requirements, per Mitigation Measures CUL-3 and GEO-1 (pages 13 and 16)
- Procedures in the event archaeological resources or human remains are encountered, per Mitigation Measures CUL-4 and CUL-5 (pages 14 and 15)
- Procedures in the event of a paleontological find, per Mitigation Measure GEO-2 (page 17) - HASP preparation and other Contractor responsibilities under Mitigation Measure HAZ-1 (page 18)
x During project planning: construction scheduling to avoid nesting season, if feasible (Mitigation Measure BIO-1, page 7)
x During project planning/bidding: avoidance of styrene resins if feasible (Mitigation Measure AIR-1, page 5)
x Prior to construction: retention of qualified staff to assist with implementation of mitigation measures, including
- City’s Biologist (Mitigation Measures BIO-1 and BIO-2, pages 7 and 9) - City’s Archaeologist (Mitigation Measures CUL-2 through CUL-5, beginning on page 12) E Redtail Consulting
- Environment & Community
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
2 - City’s Paleontologist (Mitigation Measures GEO-1 and GEO-2, pages 16 – 17) x Prior to construction: assessment of need for interpreter/translator services for Worker Awareness Training; retention of interpreter/translator if needed x Prior to construction: review of contractor submittals - Project signage, including City contact for dust complaints (Dust Control AMM, page 3) - Health and Safety Plan (HASP) submittal (Mitigation Measure HAZ-1, page 18) In addition, note that some AMMs and Mitigation Measures include activities that must occur prior to construction, highlighted in the foregoing Summary of Adopted Environmental Measures. These are not technically considered “advance preparation” since they are part of the measures themselves, but still represent early steps in the implementation process.
J'/4,i Redtail Consulting
- Environment & Community
3 2
Avoidance & Minimization Measures
Dust Control
To reduce dust generation, the following measures will be required during excavation and ground disturbance.
These measures reflect the requirements of the Bay Area Air Quality Management District’s (BAAQMD’s) Best Management Practices (BMPs) for fugitive dust control (Bay Area Air Quality Management District 2017). x All exposed surfaces (potentially including contractor parking areas, staging areas, areas subject to excavation or other ground disturbance, and unpaved access roads/routes) and soil stockpiles will be watered 2 times per day
x All haul trucks transporting soil, sand, or other loose material offsite will be covered x All visible mud or dirt track-out onto adjacent public roads will be removed using wet power vacuum street sweepers at least once per day. Use of dry power sweeping will be prohibited x All vehicle speeds in unpaved areas will be limited to 15 miles per hour x If pavement is removed, it will be replaced as soon as possible. x Vegetated areas disturbed during construction will be replanted/reseeded as soon as possible x Project signage will include the name and telephone number of City staff to contact regarding dust complaints. City staff will respond and take corrective action within 48 hours. Project signage will also include the BAAQMD’s phone number to ensure compliance with applicable regulations Timing: Throughout construction period
Responsibility: Implementation: Contractor (dust control measures), City PM or designated City staff (response to dust complaints)
Oversight: Inspector, City PM
Performance Standard: Requirements implemented as specified, as verified by City Inspector Confirmation:
E Redtail Consulting
- Environment & Community
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
4 Emissions Control
x Idling times will be minimized, either by shutting equipment off when not in use or by reducing the maximum idling time to 5 minutes. Clear notification will be provided to all equipment operators regarding limitation on idling times
x All construction equipment will be maintained and properly tuned in accordance with manufacturer specifications. All equipment will be checked by a certified mechanic and determined to be running in proper condition prior to operation
Timing: Throughout construction period
Responsibility: Implementation: Contractor
Oversight: Inspector, City PM
Performance Standard: Requirements implemented as specified, as verified by City Inspector Confirmation:
J'/4,i Redtail Consulting
- Environment & Community
5 3
Mitigation Measures
AIR-1. Toxic Air Contaminant and Odor Control
If feasible, the City will avoid the use of styrene resins for CIPP lining.
If the use of styrene resins cannot feasibly be avoided, the City will require the following measures to reduce the potential for exposure to toxic air contaminants during CIPP lining. x All use of styrene resins will be required to adhere to the standard best practices in NASSCO’s Guideline for the Safe Use and Handling of Styrene-Based Resins in Cured-in-Place Pipe (National Association of Sewer Service Companies 2020 or most current) x Sewer main reaches to be rehabilitated via CIPP will be plugged at both ends prior to lining, and a vent will be provided at each end of the reach to provide better dispersal of vapors x If steam curing is used, the steam exhaust will be located at least 250 feet from commercial/business park entry areas and all heating, ventilation, and air conditioning system air intakes. If this is not feasible, an alternative curing method will be used
x Adjacent facilities will be notified in writing at least 1 week prior to the start of work. Notification will include the following information.
- Anticipated work dates
- An overview of the repair process, including the substances proposed for use - Instructions to leave the premises, move farther away from the work area if possible, and contact the Santa Clara Fire Department if vapors or odors have entered the building, along with the appropriate Fire Department contact information - An advisory to seek medical attention promptly if exposure is suspected - A request to report any odor or health concerns to the City - The name, phone number, and email address of the City staff member who will be responsible for answering questions and receiving and responding to reports of odors or health concerns Additionally, to enable further assessment of potential concerns, the City will document any calls received regarding odors or health symptoms, and if health symptoPs are reported will conduct indoor air monitoring following a standard protocol appropriate to the type of resin and curing method(s) being used. Results of E Redtail Consulting
- Environment & Community
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1 6 monitoring will be documented in City files for consideration in planning future projects. If monitoring indicates levels of any CIPP-related emissions of any toxic air contaminant above applicable health thresholds, the City will take appropriate action to reduce the potential for exposure.
Timing: x During project planning (styrene avoidance if feasible) x Prior to construction (noticing)
x During construction (additional measures)
Responsibility: Implementation:
- City PM determines whether avoidance of styrene resins is feasible - City PM identifies point of contact for complaints and designates staff responsible for noticing; City staff conduct noticing
- Contractor implements measures for reduction of vapor exposure during construction
- City receives and documents complaints
- If warranted, City conducts indoor air monitoring, documents results, and implements any appropriate follow-up
Oversight: PW Director (overall execution)
Performance Standard: x Use of styrene resins avoided if feasible x If use of styrene resins cannot be avoided, noticing is carried out as required x If use of styrene resins cannot be avoided, measures for reduction of vapor exposure are implemented as required
x Complaints regarding odors or health symptoms (if any) are documented x If health symptoms are reported, air monitoring is carried out as required, and result are documented, and follow-up action is conducted if warranted Confirmation:
J'/4,i Redtail Consulting
- Environment & Community
City of Santa Clara Monitoring & Reporting Program
Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 Redtail Consulting Environment & Community 7
BIO-1. Protection of Nesting Birds (General), All Segments If feasible, all project-related activity within 300 feet of the proposed repair Segments will be scheduled between September 1 and January 31, outside the February 1 – August 31 nesting period.
If project-related activity at any Segment occurs during the nesting period, the City will retain a qualified biologist to conduct a preconstruction nesting bird survey covering the Segment footprint and a 300-foot-wide surrounding buffer. The survey will be conducted within 2 weeks of the start of construction-related activity at the Segment. If active nest(s) of any protected species are identified within the 300-foot-wide survey area, a no- activity buffer will be established around the nest for the duration of the nesting season, or until a biologist determines the young have fledged and left the nest, or that the nest has been abandoned. No entry into the no- activity buffer will be permitted. The no-activity buffer will be delineated in the field by or under the supervision of the biologist, using temporary construction fencing or another suitable low-impact medium. The width of the buffer will be determined by the biologist, based on the species involved, the amount of vegetative and other screening between the nest and areas where construction activity will take place, and, if appropriate, other site- specific factors. If special-status species are involved, the biologist will consult with the appropriate resource agency(ies) (California Department of Fish and Wildlife and/or U.S. Fish and Wildlife Service) in determining the width of the buffer.
Timing: x During project planning (scheduling)
x Prior to construction (surveys)
x During construction (if needed, avoidance)
Responsibility: Implementation:
- City PM retains Biologist
- Biologist conducts surveys, establishes no-activity buffers if needed, conducts site checks to verify nesting status, communicates status to City, removes buffers (if any)
- Contractor avoids areas within no-activity buffers
Oversight:
- City PM (Biologist)
- Inspector (Contractor performance)
- PW Director (overall execution)
Performance Standard: x If construction occurs during nesting period, surveys are conducted prior to construction (within 2 weeks of Contractor mobilization) x Buffers are installed if warranted
x Buffer areas are avoided
x Biologist site checks are conducted until nesting success or nest abandonment is verified, or until construction is complete, whichever comes first
x Buffers are removed by biologist following nesting completion or Contractor demobilization, whichever comes first
Confirmation:
Ii
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
8 J'/4,i Redtail Consulting
- Environment & Community
City of Santa Clara Monitoring & Reporting Program
Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 Redtail Consulting Environment & Community 9
BIO-2. Protection of Nesting Burrowing Owl, Segments 231 and 232 If repair work at Segment 231 or Segment 232 occurs during the Western Burrowing Owl nesting season (February 1 – August 31), the City will retain a qualified biologist to conduct preconstruction surveys covering all areas of suitable habitat within 250 feet of the Segment. The survey will last a minimum of 3 hours, and will either begin 1 hour before sunrise and continue until 2 hours after sunrise or begin 2 hours before sunset and continue until 1 hour after sunset. If no owls are detected during a first survey, a second survey will be conducted. If owls are detected during the first survey, a second survey is not needed. All owls observed will be counted and their locations will be mapped.
If evidence of nesting Western Burrowing Owls is found, a 250-foot-wide no-disturbance buffer zone will be established around each occupied nest and will be delineated in the field by the biologist, using a suitable low- impact medium. Construction may proceed outside the no-disturbance buffer zones.
Timing: x Prior to construction (surveys)
x During construction (if needed, avoidance)
Responsibility: Implementation:
- City PM retains Biologist
- Biologist conducts surveys, establishes no-disturbance buffer(s) if needed, conducts site check(s) to verify nesting status, communicates status to City, removes buffer(s)
- Contractor avoids areas within no-disturbance buffers Oversight:
- City PM (Biologist)
- Inspector (Contractor performance)
- PW Director (overall execution)
Performance Standard: x Survey(s) conducted prior to groundbreaking, per specifics in measure x Locations are documented if owls are present
x Buffers are installed if warranted
x Buffer areas are avoided
x Biologist site checks are conducted to verify avoidance and monitor nesting progress
x Biologist site checks are conducted until nesting success or nest abandonment is verified, or until construction is complete, whichever comes first
x Buffer(s) are removed by biologist following nesting completion or Contractor demobilization, whichever comes first
Confirmation:
Ii
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
10 J'/4,i Redtail Consulting
- Environment & Community
City of Santa Clara Monitoring & Reporting Program
Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 Redtail Consulting Environment & Community 11
CUL-1. Notice of Potential for Buried Cultural Resources in Construction Documents
The potential to encounter buried cultural resources, including Native American burials, will be noted in the project construction documents.
Timing: Design phase
Responsibility: Implementation:
- Design consultant
Oversight:
- City PM
Performance Standard: x Information included in construction documents as required Confirmation:
Ii
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
12 CUL-2. Retention of On-Call Archaeologist
Prior to construction, the City will retain a qualified professional archaeologist (City’s Archaeologist) with experience in northern and central California archaeology on an on-call basis for the duration of all ground- disturbing activities. The City’s Archaeologist will be responsible for reviewing, identifying, and evaluating cultural resources (if any) exposed during construction, for determining whether they qualify as unique archaeological resource(s) under CEQA, and, if needed, recommending and implementing appropriate follow-up treatment.
Timing: Prior to construction
Responsibility: Implementation: City PM
Oversight: PW Director
Performance Standard: x Archaeologist is retained before construction begins x Archaeologist can demonstrate experience in northern and central California archaeology
Confirmation:
J'/4,i Redtail Consulting
- Environment & Community
City of Santa Clara Monitoring & Reporting Program
Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 Redtail Consulting Environment & Community 13
CUL-3. Worker Awareness Training for Cultural Resources Prior to groundbreaking at each of the Segments, the City’s Archaeologist (defined in Mitigation Measure CUL- 2) will develop and present in-person, hands-on worker awareness training for archaeological resources.
Training will include information on the possibility of encountering resources during construction; the types of resources that may be seen and how to recognize them; and proper procedures in the event resources are encountered. All field management and supervisory personnel and construction workers involved with ground- disturbing activities will be required to take this training prior to beginning work on the project. Upon completion of the training, workers will be required to sign a form stating that they attended the training, understand, and will comply with the information presented.
Timing: At construction start-up, prior to groundbreaking Note that if the same crew will carry out repairs at all Segments, only one training will be needed; if crews change, additional training prior to groundbreaking at subsequent Segments will be necessary
Responsibility: Implementation:
- City PM retains City’s Archaeologist
- City’s Archaeologist conducts training, including collection of worker signatures
- Contractor identifies personnel and sends them to training Oversight: PW Director
Performance Standard: x Training is properly conducted and documented x Staff delivering training meet qualifications in Mitigation Measure CUL-2 Confirmation:
Ii
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
14 CUL-4. Evaluation and Treatment of Unanticipated Archaeological Discoveries
If known or suspected archaeological resources are discovered during construction, work in the immediate area of the find will cease and the contractor will be required to notify the City before the end of the work day. The find will be protected in place until the City’s Archaeologist has evaluated it and identified appropriate follow-up measures, if any. If the City’s Archaeologist determines that the resource qualifies as a unique archaeological resource under CEQA, they will notify the City and other appropriate parties and recommend follow-up measures to reduce impacts, in accordance with Section 15064.5 of the CEQA Guidelines. Depending on the nature of the find, follow-up measures may include avoidance, preservation in place, recordation, monitoring during ongoing work, additional archaeological testing, and data recovery, among other options. The City’s Archaeologist may recommend completion of a formal Archaeological Monitoring Plan (AMP) and/or Archaeological Treatment Plan (ATP), potentially including data recovery, if significant archaeological deposits are exposed during ground-disturbing activities. The City will be responsible for proper implementation of the AMP and ATP. If archaeological evaluation, monitoring, or treatment is required, the City’s Archaeologist will prepare and file a Monitoring Closure Report with the City, documenting the nature of the find(s), evaluation methods, and outcomes.
Timing: Throughout construction period
Responsibility: Implementation:
- In the event of a known or potential find, Contractor implements stop work, protection, and avoidance in the event of a find; reports find to City - City notifies City’s Archaeologist
- City’s Archaeologist responds to and evaluates find; if needed, recommends treatment; if needed, implements treatment and prepares and files Monitoring Closure Report
- Contractor coordinates with and enables evaluation and treatment of find Oversight: City PM
Performance Standard: x In the event of a find, resources are protected, evaluated, and treated if appropriate
x Treatment conforms to CEQA requirements
x Treatment is documented in Monitoring Closure Report per specifics in measure
Confirmation:
J'/4,i Redtail Consulting
- Environment & Community
City of Santa Clara Monitoring & Reporting Program
Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 Redtail Consulting Environment & Community 15
CUL-5. Procedures for Discovery of Human Remains
The treatment of human remains and funerary objects discovered during any project related ground-disturbing activity will comply with all applicable state laws. If known or potential human remains are encountered during project-related activities, work within 50 feet of the discovery and in any nearby areas reasonably suspected to overlie adjacent remains will cease, the find will be protected in place, and the contractor will be required to notify the City before the end of the work day. The City will promptly notify the Santa Clara County Coroner, who will be responsible for determining whether the remains are Native American. If the Coroner determines that the remains are Native American and are not subject to their authority, they will notify the Native American Heritage Commission, which is responsible for identifying and notifying descendant(s) of the deceased so they can make recommendations regarding the treatment of the remains. The City will be responsible for facilitating the disposition of remains recommended by the Most Likely Descendant(s). If no satisfactory agreement can be reached as to the disposition of the remains pursuant to state law, the City will respectfully reinter the human remains and items associated with the burial on City property in a location not subject to further subsurface disturbance. A final report detailing the find, follow-up activities, and disposition of remains will be prepared by the City’s Archaeologist or other qualified staff, and will be submitted to the City’s Director of Community Development promptly following disposition of the remains. The report will be subject to review and approval by the City’s Director of Community Development.
Timing: Throughout construction period
Responsibility: Implementation:
- In the event of a known or potential find, Contractor implements stop work, protection, and avoidance; reports find to City
- City PM notifies County Coroner and proceeds according to Coroner direction
- If remains are Native American, City coordinates with Most Likely Descendent and facilitates reburial per Most Likely Descendent recommendations
- If reinterment of remains on City property is necessary, City coordinates location and facilitates reburial
- Contractor coordinates with and enables evaluation and treatment of find Oversight: PW Director
Performance Standard: x California state legal requirements for treatment of human remains are satisfied
x If Native American remains are encountered, either:
- recommendations of Most Likely Descendant for disposition of remains are implemented, or
- in the absence of recommendations from Most Likely Descendant, remains are respectfully reinterred at a City-owned location where they will not be subject to further disturbance
Confirmation:
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
16 J'/4,i Redtail Consulting
- Environment & Community
City of Santa Clara Monitoring & Reporting Program
Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 Redtail Consulting Environment & Community 17
GEO-1. Worker Awareness Training for Paleontological Resources Prior to groundbreaking, the City will retain qualified staff to develop and present in-person, hands-on worker awareness training for paleontological resources. As used here, qualified staff refers to an individual who satisfies one or both of the following criteria.
x A Principal Paleontologist as defined by the Society of Vertebrate Paleontology (Society of Vertebrate Paleontology Impact Mitigation Guidelines Revision Committee 2010), who is experienced in delivering training to nonspecialists
x A California-licensed professional geologist (PG) who has expertise in South San Francisco Bay Area stratigraphy and paleontology and is experienced in delivering training to nonspecialists Training will be concise and substantive. It will include information on the possibility of encountering fossils during construction; the types of fossils that may be seen and how to recognize them; and proper procedures in the event fossils are encountered. All field management and supervisory personnel and construction workers involved with ground-disturbing activities will be required to take this training prior to beginning work on the project. Upon completion of the training, workers will be required to sign a form stating that they attended the training, understand, and will comply with the information presented.
Timing: At construction start-up, prior to groundbreaking Note that if the same crew will carry out repairs at all Segments, only one training will be needed; if crews change, additional training prior to groundbreaking at subsequent Segments will be necessary
Responsibility: Implementation:
- City PM retains City’s Paleontologist
- City’s Paleontologist conducts training, including collection of worker signatures
- Contractor identifies personnel and sends them to training Oversight: PW Director
Performance Standard: x Training is properly conducted and documented x Staff developing/delivering training meet qualifications specified in measure Confirmation:
Ii
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
18 GEO-2. Stop-Work, Evaluation, and Treatment in the Event of a Paleontological Find
If vertebrate remains or other potentially significant fossil resources are discovered during project-related activities, all work in the immediate vicinity of the discovery will cease, the find will be protected in place, and the contractor will be required to notify the City before the end of the work day. The City will detail qualified staff— i.e., staff meeting the criteria for a Qualified Professional Paleontologist as defined by the Society of Vertebrate Paleontology (Society of Vertebrate Paleontology Impact Mitigation Guidelines Revision Committee 2010)—to evaluate the find and recommend appropriate follow-up treatment. Work may continue on other parts of the alignment while evaluation (and, if needed, treatment) takes place, as long as the find can be adequately protected in the judgment of the qualified staff. The City will be responsible for ensuring that the recommendations of the qualified staff regarding treatment and reporting are implemented.
Timing: Throughout construction period
Responsibility: Implementation:
- In the event of a known or potential find, Contractor implements stop work, protection, and avoidance; reports find to City
- City notifies Paleontologist
- City’s Paleontologist responds to find, evaluates find; if needed, recommends treatment; if needed, implements treatment
- Contractor complies with Paleontologist direction for avoidance/treatment of find
Oversight: City PM
Performance Standard: x In the event of a find, resources are protected, evaluated, and, if warranted, treated (recovered, curated, reported)
x Staff evaluating find and recommending/implementing treatment meet qualifications stipulated in measure
Confirmation:
J'/4,i Redtail Consulting
- Environment & Community
City of Santa Clara Monitoring & Reporting Program
Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 Redtail Consulting Environment & Community 19
HAZ-1. Contaminated Groundwater, Soil, and Soil Vapor Protection The contractor will be required to prepare and submit a Health and Safety Plan (HASP) for worker and public safety during all phases of sewer and manhole repair work. The HASP will be tailored to the contaminants potentially present, the media potentially affected/involved (soil, groundwater, soil vapor), and the activities planned. The HASP will be subject to review and approval by a Certified Industrial Hygienist and the City, and at a minimum will include the following requirements.
x Contractor staff will be required to wear appropriate Personal Protective Equipment (PPEs) and the contractor will be required to employ Best Management Practices (BMPs) to minimize and monitor human exposure to potential contaminants, consistent with applicable federal and state requirements, including Title 29 of the Code of Federal Regulations and California Department of Industrial Relations, Division of Occupational Safety and Health (Cal/OSHA) guidelines (California Code of Regulations, Title 8). Construction BMPs described in the HASP will include, but will not necessarily be limited to, the following
x Public access to the active work site will be prohibited using appropriate safety barriers and signage x If contaminated soil, groundwater, or other materials encountered during construction activities qualify as hazardous waste (per California Code of Regulations, Title 22), all contractor employees (and subcontractors, if any) handling the hazardous waste will be certified in OSHA’s 40-hour Hazardous Waste Operations and Emergency Response (HAZWOPER) training x If dewatering is required, groundwater removed from excavations will be stored in a settling tank and tested onsite for contamination prior to discharge in accordance with applicable permit requirements. If contaminant levels are detected in excess of the applicable discharge limits per the contractor’s discharge permit, the groundwater will either be treated onsite using appropriate technology (e.g., sediment filter, activated carbon filter, or other appropriate alternative methods) prior to discharge to the sanitary sewer, or will be removed from the site for appropriate offsite disposal. Groundwater treatment and offsite disposal options will be described in the HASP x Contractor will stockpile excavated materials prior to onsite reuse as backfill or offsite disposal at an appropriately permitted landfill. Contractor will water/mist soil as it is being excavated. Stockpiled soil will be placed in areas shielded to the extent feasible from prevailing winds and will be covered with plastic sheeting to prevent fugitive dust and vapor emissions and to shield the stockpile from potential rain. Stockpiles will be placed away from drainage courses, gutters, and stormdrain inlets to prevent contact with stormwater runoff. Public access to the stockpile area(s) will be prohibited using appropriate barriers and signage. Soil exhibiting signs of potential contamination (such as staining, odors, or the presence of debris) will be placed in a separate stockpile x Soil that does not exhibit signs of potential contamination may be reused as backfill in the excavation from which it was removed
x Excavated materials that exhibit signs of potential contamination, and excavated materials that are planned for offsite disposal at a landfill (if any), will be tested for contaminants in accordance with the receiving landfill’s requirements and the U.S. Environmental Protection Agency’s (EPA’s) SW-846 guidelines (available: https://www.epa.gov/hw-sw846)
x If testing of excavated materials indicates any contaminant levels in excess of hazadous waste thresholds (per California Code of Regulations, Title 22), excavated materials will be handled and Ii
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
20 disposed of by a licensed hazardous waste disposal contractor and transported by a licensed hazardous waste hauler to an appropriately licensed and permitted disposal facility, in accordance with local, state, and federal requirements. Contractor will water/mist soil as it is being loaded onto haul trucks to prevent fugitive dust generation, and haul trucks will be covered and the truck wheels and body brushed clean to control trackout, fugitive dust, and vapor emissions during transport x If import fill materials (e.g., soil, sand, aggregate base) are used, they will be sourced and tested in accordance with guidance from the California Department of Toxic Substances Control’s Information Advisory Clean Imported Fill Material (available: https://dtsc.ca.gov/information-advisory-clean- imported-fill-material-fact-sheet/). Fill material testing results will be provided to the City for review and approval prior to importing the fill materials to the project site. No fill material will be imported for use at any of the repair Segments if it contains any contaminant at a level exceeding hazardous waste thresholds (per California Code of Regulations, Title 22) or the applicable Regional Water Quality Control Board (RWQCB) Environmental Screening Level (ESL) for commercial/industrial land use, with the exception of arsenic for which the naturally ocurring background level of 11 milligrams per kilogram (mg/kg) (per Duvergé 2011) will apply as a limiting threshold x The contractor will monitor ambient air in the trench and around the perimeter of the active work area for fugitive vapor emissions, including volatile organic compounds (VOCs), methane, and other sewer/landfill gases, using appropriate field screening instrumentation. If any contaminant level in excess of applicable Cal/OSHA Permissible Exposure Levels is detected, worker PPEs will be required to include inhalation protection meeting Cal/OSHA standards, and/or work will be suspended until airborne concentrations decrease below the action threshold, as verified by ambient air monitoring. If air monitoring indicates the presence of flammable vapors in excess of their lower explosive limits (LELs) or other hazardous atmosphere conditions (e.g., oxygen-deficient atmosphere) work will be suspended until the hazardous atmosphere conditions have been mitigated as verified by air monitoring. Vapor control measures (e.g., spraying water or vapor supressants, covering exposed soil with plastic sheeting, and ventilation of excavations and manholes) will be performed as necessary based on air monitoring results, to maintain vapor concentrations below PELs and LELs and ensure that safe oxygen levels (20.8% 21%) are present in the trench and surrounding work area The project Contract Documents will stipulate contractor responsibilities in implementing these requirements.
Timing: x Design phase (contractor responsibilities identified in construction documents) x Prior to construction (HASP development and review/approval) x During construction (HASP implementation)
Responsibility: Implementation:
- Design team incorporates Contractor responsibilities in construction documents
- Contractor prepares HASP; Certified Industrial Hygienist and City review/approve
- Contractor implements HASP requirements, including use of appropriately trained staff
Oversight: City PM
Performance Standard: x HASP is approved by Certified Industrial Hygienist and City J'/4,i Redtail Consulting
- Environment & Community
City of Santa Clara Monitoring & Reporting Program
Sanitary Sewer Condition Assessment Repairs – Package 1 March 2023 Redtail Consulting Environment & Community 21
x HASP includes all minimum requirements stipulated in measure; may include other requirements
x All HASP requirements are met throughout construction period, including staff qualifications and use of PPEs
x Testing of potentially contaminated spoils complies with EPA’s SW-846 guidelines
x If import fill is used, it is sourced and tested in accordance with DTSC’s Clean Imported Fill Material Information Advisory and meets requirements identified in measure
x Air monitoring and follow-up are conducted according to measure requirements
Confirmation:
Ii
Monitoring & Reporting Program City of Santa Clara
March 2023 Sanitary Sewer Condition Assessment Repairs – Package 1
22 4
References & Standards Cited in this Document
Bay Area Air Quality Management District. 2017. California Environmental Quality Act Air Quality Guidelines. (May.) Available: http://www.baaqmd.gov/~/media/files/planning-and-research/ceqa/ceqa_guidelines_ may2017-pdf.pdf?la=en. Downloaded: December 2017.
Duvergé, D. 2011. Establishing Background Arsenic in Soil of the Urbanized San Francisco Bay Region, December. Available: https://www.waterboards.ca.gov/sanfranciscobay/water_issues/ available_documents/2011_Arsenic_Background_Duverge.pdf. Accessed: May – June 2022.
National Association of Sewer Service Companies. 2020. Guideline for the Safe Use and Handling of Styrene- Based Resins in Cured-in-Place Pipe. (October.) Available: https://www.nassco.org/wp- content/uploads/2021/02/Safe-Handling-and-Use-of-Styrene_Specification-Guideline-_-2020-2.pdf.
Downloaded: October 2022.
Redtail Consulting. 2021a. Memorandum: Annual Sanitary Sewer Reparis 2021, 2022, & 2023 Projects – 2021 Construction Package Statutory Exemption Screening. (September.) Prepared for City of Santa Clara Public Works Department, Santa Clara, CA. Fremont, CA.
Redtail Consulting. 2021b. Memorandum: Annual Santiary Sewer Repairs 2021, 2022, & 2023 Projects – 2021 Construction Package Categorical Exemption Screening. (October.) Prepared for City of Santa Clara Public Works Department, Santa Clara, CA. Fremont, CA.
Society of Vertebrate Paleontology Impact Mitigation Guidelines Revision Committee. 2010. Standard Procedures for the Assessment and Mitigation of Adverse Impacts to Paleontological Resources.
Available: http://vertpaleo.org/Membership/Member-Resources/SVP_Impact_Mitigation_Guidelines.aspx.
Downloaded: July 2018.
J'/4,i Redtail Consulting
- Environment & Community
6HJPHQW
660+
6HJPHQW
6HJPHQW
660+
660+
660+
6HJPHQW
660+
660+
6WDWH5RXWH
/DID\HWWH6WUHHW
City of
Santa Clara
The Conic, of Wh ot's Posslblo
Sanitary Sewer Condition Assessment Repairs - Package 1 Initial Study & Proposed Mitigated Negative Declaration Consideration of Comments
CEQA Requirements
One of the primary purposes of the California Environmental Quality Act (CEQA) is enabling the public and other interested agencies to review and comment on projects proposed or approved by public agencies. To that end, following circulation of a CEQA document for public comment, the CEQA statute and the state's CEQA Guidelines require the lead agency (i.e., the agency approving and/or carrying out the project; in this case the City of Santa Clara) to consider the comments received prior to approving the project (California Public Resources Code 21091[d][1], 20191[~; CEQA Guidelines 15074).
Lead agencies must respond formally to comments on an Environmental Impact Report (EIR) (California Public Resources Code 21091 [d][2], CEQA Guidelines 15088). If the circulated document is an Initial Study (IS) and the lead agency intends to adopt a Negative Declaration (ND) or a Mitigated Negative Declaration (MND), there is no "affirmative duty" for the lead agency to prepare formal responses to comments (e.g., Bass et al. 1999).
However, the lead agency must "consider" the proposed ND or MND "together with any comments received during the public review process" and may adopt the ND or MND (and approve the project) only if it finds on the basis of the whole of the record before it-including the IS and any comments received-that there is no substantial evidence the project would have a significant effect on the environment (CEQA Guidelines 1507 4[b]). If, again based on the whole of the record, a fair argument1 can be made that the project would have a significant impact on the environment, more extensive analysis is required, in the form of an EIR (CEQA Guidelines 15964[a][1 ].
Background
In December 2022 - January 2023, the City of Santa Clara (City) Public Works Department circulated an IS (State Clearinghouse# 2022120288, https://ceqanet.opr.ca.gov/2022120288) analyzing the environmental effects of five projects proposed to repair high-priority defects identified through the City's routine program of sanitary sewer system condition assessments.2 The repairs included the following. • At repair Segment 100, in Mathew Street west of De La Cruz Boulevard: removing 166 linear feet (LF) of existing 18-inch-diameter VCP sewer line and replacing it with 18-inch-diameter polyvinyl chloride 1 The "fair argument standard" is laid out in CEQA Guidelines 15384, which emphasizes the need for "substantial information," defined as "facts, reasonable assumptions predicated upon facts, and expert opinion supported by facts." 2 The remainder of the Package 1 repairs were found to qualify for one or more CEQA exemptions; the IS/MND addressed only the repairs found not to qualify (see Redtail Consulting 2021 a, 2021 b; Abbe pers. comm.; City of Santa Clara 2022). ~ Redtail Consulting
,. Environment & Community
1 IS & Proposed MND Consideration of Comments City of Santa Clara March 2023 Sanitary Sewer Condition Assessment Repairs - Package 1 (PVC) sewer line; removing and replace sanitary sewer manhole (SSMH) 57-35 at west terminus of Segment
• At repair Segment 231, crossing Lafayette Street southwest of the City's Eastside Retention Basin:
installing 278 LF of cured-in-place-pipe (CIPP) lining in existing 42-inch-diameter reinforced concrete pipe (RCP) sewer line; replacing cones of SSMH 114-14 and SSMH 114-23 at termini of Segment • At repair Segment 232, in Lafayette Street, extending south from west terminus of Segment 231:
installing 437 LF of CIPP lining in existing 42-inch-diameter RCP sewer line; replacing cone of SSMH 104-9 at south terminus of Segment
• At repair Segment 233, in Lafayette Street immediately south of Segment 232: installing 491 LF of CIPP lining in existing 42-inch-diameter RCP sewer line; replacing cone of SSMH 104-15 at south terminus of Segment
• At Segment 242, Lafayette Street between Calle del Mundo and the PAL BMX track facility: installing 430 LF of CIPP lining in existing 42-inch-diameter RCP sewer line; replacing cones of SSMH 104-17 and SSMH 104-22 at termini of Segment
The IS/MND circulation period began on December 14, 2022 and concluded on January 13, 2023.
Based on analysis in the IS, and having considered the comments received during circulation of the IS, the City now proposes to adopt an MND. The MND reflects the City's finding that with incorporation of the Avoidance and Minimization Measures included in the projects ( discussed in Section 2 of the IS) and the mitigation measures identified in the IS analysis, the projects would not result in any Significant adverse effects on the environment. The Proposed MND was also circulated for public review, as an Appendix to the IS.
Consideration of Comments
The IS and the Notice of Intent published by the City as required by CEQA Guidelines Section 15072 provided both postal and email addresses where comments could be sent. Only one comment communication-from Valley Water, transmitted via email-was received during the IS circulation period, and as of February 9, 2023 no late comments have been received.
Table 1 itemizes the comments in Valley Water's email and considers each comment in detail. The original comment email is presented in Appendix A; individual comments are numbered and keyed to discussion in Table 1. Valley Water's comments included one that addressed IS content, and two that were informational in nature.
Comment on IS Content: Potential for Pollutant Releases Due to Flooding Valley Water's primary comment (Comment 1-1 in Appendix A) was that analysis of Potential for Release of Pollutants Due to Flood, Tsunami, or Seiche Inundation beginning on IS page 3-66 omits discussion of flood inundation. This is correct, and that analysis is provided in detail in Table 1 and summarized below.
As Table 1 discusses in more detail, all of the proposed repair Segments are located within flood hazard zones.
Segment 100 is entirely within Flood Zone X (Area with Reduced Flood Risk Due to Levee) (shaded), which is considered a moderate flood hazard area since it lies outside the 100-year flood inundation area but within the 500-year flood limit (Federal Emergency Management Agency 2020). Zones AO and AH are within the 100-year 2 Redtail Consulting E
Environment & Community Ill
Table 1. Consideration of Comments
Comment # Comment Discussion
1: Email from Matt Sasaki, Assistant Engineer II, Valley Water (01/13/2023) 1-1 The discussion on Potential for Releases of Pollutants Due to Flood, Tsunami, or Seiche Inundation on page 3-66 discusses the potential release of pollutants due to tsunami, mudflows, and seiche. There is not [sic] discussion of releases due to floods. Please update the discussion to address release of pollutants due to floods. According to the Federal Emergency Management Agency (FEMA) Flood Insurance Map (FIRM) Panel 060085C0227H, Segment 100 is located in Zone X, an area with a reduced flood risk due to a levee. According to FEMA FIRM Panel 06085C0061 H, portions of segments 231, 232, 233, and 242 are in Zone X ( an area with reduced flood risk due to a levee), Zone AH (a special flood hazard area with a flood depth of 5 feet), and Zone AO (a special flood hazard area with a flood depth of 1 foot).
The commenter is correct. In more detail, FEMA's online National Flood Hazard Layer (NFHL) Viewer (Federal Emergency Management Agency n.d.) shows the following.
• Segment 100 is located entirely within Flood Zone X (Area with Reduced Flood Risk Due to Levee) (shaded)
• The east terminus of Segment 231 is located in an area of Zone AH (EL 6) around the City's Eastside Retention Basin; to the west, it crosses an area in Zone X along Lafayette Street and a narrow area of Zone AO (DEPTH 1), terminating within Zone AH (EL 6)
• The north portion of Segment 232 is within Zone AH (EL 6); the remainder of the Segment, where it enters the Lafayette Street corridor, is within Zone Zone AO (DEPTH 1)
• Segments 233 and 242 are entirely within an area of Zone AO (DEPTH 1) along the Lafayette Street corridor
Zones AO and AH are within what FEMA refers to as the Special Flood Hazard Area-that is, the area inundated by the flood event that has a 1 % chance of being equaled or exceeded in a given year, sometimes referred to as the 100-year flood.
Zone X (shaded) is considered a moderate flood hazard area since it lies outside the Special Flood Hazard Area but is within the inundation limits of the flood event that has an 0.2% chance of occurring in any given year (the 500-year flood) (Federal Emergency Management Agency 2020). Consequently, all 5 repair Segments are considered to be at some, albeit very low, risk of flooding.
Construction Period
During construction, the risk of pollutant releases as a result of flooding relates to:
(1) the potential for substances routinely used during construction-such as fuels, lubricants, and paving and striping media-to be spilled, entrained, and remobilized by floodwaters; and
(2) particularly at Segment 100, where a known contaminant plume extends into the roadway and could be encountered during trench excavation (City of Santa Clara 2022), the potential for remobilization of contaminants present in soil and/or groundwater due to flood erosion of the exposed substrate Comment # Comment Discussion
However, the potential for flooding to occur during construction at any of the Segments is considered very low, based on FEMA flood hazard mapping and the fact that construction at each Segment would be of short duration, as follows (see City of Santa Clara 2022, Table 2-4).
• Segment 100: 10 days maximum
• Segments 231 - 233: 10 days maximum for all three Segments • Segment 242: 4 days maximum
Moreover, construction would likely be scheduled during the dry months of the year when protracted heavy rainfall and flooding are least likely.
In addition, although contractors are generally required to make every effort to continue work in inclement weather to avoid project delays, the City's Standard Specifications (Section 15.2 F - G) allow rainfall in excess of 0.1 inch per day as a cause of construction delays and schedule extensions, subject to certain limitations. This would reduce the impetus to continue work when flooding is likely-for instance in prolonged storm sequences such as those of early 2023.
The Standard Specifications also require contractors to provide for site drainage and protect the work area from erosion (Section 1.11), and to provide "methods, means, and facilities ... to prevent contamination of soil [and] water" by construction-related pollutants (Section 1.12).
In view of all these factors, the potential for pollutant releases due to flood inundation during construction is evaluated as Less than Significant. No mitigation is required, and no further analysis is warranted at the project-specific level.
A Significant cumulative impact with regard to the potential for pollutant releases during flooding could be argued to exist throughout the City-and the Santa Clara Valley in general-as a result of pervasive urbanization. However, the same factors that reduce the localized, project-specific potential for impacts to a Less than Significant level would also reduce potential construction-related contributions to any such cumulative impact to a Less than Cumulatively Considerable level. No mitigation is required, and no further analysis is warranted at the cumulative level.
Long Term
None of the proposed repairs would add new above-grade facilities, and over the long term, as discussed on IS page 3-67 for seiche hazards, they would substantially improve the integrity of existing sewer infrastructure. Consequently, there would be No Impact with regard to increased potential for pollutant releases Comment # Comment Discussion
1-2
1-3
Valley Water does not have any right of way or facilities at the project sites; therefore in accordance with Valley Water's Water Resources Protection I Ordinance, a Valley Water encroachment permit is not required for the proposed I improvements.
I
We appreciate the opportunity to review and comment on the Initial Study and Proposed MND for the Sanitary Sewer Condition Assessment Repairs - Package 1 Project. If you have any questions, please contact Matt Sasaki at (408) 630-3776 or [email protected]. Please reference File# 33804 on future I correspondence regarding this project.
due to flood inundation over the long term. If anything, by improving sewer pipeline and manhole integrity, the proposed repairs would decrease the likelihood of damage resulting in sewage releases under flood conditions. This would represent a Beneficial Impact. The reduced need for future maintenance (with associated potential for pollutant releases during flooding) would also represent a Benefit. No mitigation is required, and no further analysis is warranted at the project-specific level.
The same factors would apply at the cumulative level. Overall, the increase in sewer and manhole integrity would reduce the potential for flooding-related sewage releases, and the decreased need for future maintenance would similarly reduce the potential for flooding-related pollutant releases during future repairs.
Contributions to any cumulative impact related to release of pollutants due to flooding is accordingly evaluated as Less than Cumulatively Considerable, with a Benefit anticipated. No mitigation is required, and no further analysis is warranted at the cumulative level.
Comment noted. This comment does not bear on the content or adequacy of the IS. Please note that permits and approvals required to implement the proposed I projects are discussed on page 1-4 of the IS, which identifies that all five projects are outside Valley Water's rights-of-way. No further discussion or analysis is I warranted.
Comment noted. This comment does not bear on the content or adequacy of the IS. No further analysis is warranted.
City of Santa Clara
March 2023
IS & Proposed MND Consideration of Comments
Sanitary Sewer Condition Assessment Repairs - Package 1 flood inundation area. As a result, all of the repair Segments are considered to be subject to some degree of flood hazard, although the risk is statistically quite low.
Project-Specific Impacts
As noted above, the risk of flooding at the repair Segments is low. The likelihood of inundation during construction is even lower, since construction at each Segment would be quite short-term (less than 10 days maximum at Segment 100, and substantially shorter at each of the other Segments), and construction would likely be scheduled during the dry months of the year, when protracted heavy rainfall and flooding are least likely. Additionally, although contractors are required to make every effort to continue work in inclement weather to avoid project delays, the City's Standard Specifications (Section 15.2 F - G) allow rainfall in excess of 0.1 inch per day as a cause schedule extensions, subject to certain limitations. This would reduce the impetus to continue work when flooding is likely-for instance in prolonged storm sequences such as those of early 2023.
The Standard Specifications also require contractors to provide for site drainage and protect the work area from erosion (Section 1.11 ), and to provide "methods, means, and facilities ... to prevent contamination of soil [and] water'' by construction-related pollutants (Section 1.12). In view of all these factors, the potential for pollutant releases due to flood inundation during construction is evaluated as Less than Significant. No mitigation is required, and no further analysis is warranted at the project-specific level.
Over the long term, none of the proposed repairs would add new above-grade facilities, and all would substantially improve the integrity of existing sewer infrastructure. Consequently, over the long term there would be No Impact with regard to increased potential for pollutant releases due to flood inundation. Rather, by improving sewer integrity, the proposed repairs would decrease the likelihood of damage resulting in sewage releases as a result of flooding, representing a Beneficial Impact. No mitigation is required, and no further analysis is warranted as a result of this comment.
Cumulative Impacts
As Table 1 notes, a Significant cumulative impact with regard to the potential for pollutant releases due to flooding could be argued to exist throughout the City and the Santa Clara Valley in general. During construction the same factors that reduce the localized, project-specific potential for impacts to a Less than Significant level would also reduce potential construction-related contributions to the cumulative risk to a Less than Cumulatively Considerable level. Over the long term, increased sewer and manhole integrity would reduce the potential for flooding-related sewage releases, and the decreased need for future maintenance would similarly reduce the potential for flooding-related pollutant releases during future repairs. Long-term contributions to any cumulative impact related to release of pollutants due to flooding are therefore also evaluated as Less than Cumulatively Considerable, with a Benefit anticipated. No mitigation is required, and no further analysis is warranted at the cumulative level.
Informational Comments
Valley Water also commented (Comment 1-2 in Appendix A) that it has no facilities or right-of-way at the proposed work sites and that the projects would therefore not require Valley Water encroachment permitting.
Permits and approvals required to implement the proposed projects are discussed on page 1-4 of the IS, which identifies that all five projects are outside Valley Water's rights-of-way. Valley Water's last comment (Comment 1-3 in Appendix A) provided contact information for follow-up questions. These informational comments are helpful, and because neither directly addresses the adequacy of the IS, they do not warrant further discussion or analysis.
~ Redtail Consulting
- Environment & Community
3 IS & Proposed MND Consideration of Comments
Sanitary Sewer Condition Assessment Repairs - Package 1 Conclusion
City of Santa Clara
March 2023
In view of the considerations summarized above and presented in more detail in Table 1, Valley Water's comments do not present information rising to the level of fair argument that an undisclosed Significant impact would occur. No further analysis is warranted at either the project-specific or the cumulative level as a result of any of these comments.
References Cited
Abbe, A. (City of Santa Clara, City Attorney's Office). Pers. comm. Email to Falguni Amin and Vincent Luchessi (City of Santa Clara, Department of Public Works). February 17, 2022. On file with Redtail Consulting.
Bass, R.E, Herson, A.I., and Bodgan, K.M., 1999, CEQA Deskbook: a Step-by-Step Guide on How to Comply with the California Environmental Quality Act (2nd edition): Solano Press Books, Point Arena, CA.
City of Santa Clara. 2022. Sanitary Sewer Condition Assessment Repairs - Package 1 Initial Study and Proposed Mitigated Negative Declaration. (December.) Santa Clara, CA. Prepared for the City of Santa Clara Public Works Department by Redtail Consulting, Fremont, CA. Available:
https://ceqanet.opr.ca.gov/2022120288.
Federal Emergency Management Agency. n.d. National Flood Hazard Layer (NFHL) Viewer. Available:
https://hazards-fema.maps.arcgis.com/apps/webappviewer/index.html?id= 8b0adb51996444d4879338b5529aa9cd&extent=-121.94965689392994,37. 36209724087 428,- 121.9452205202187,37 .36422907388417. Accessed: January 2023.
Federal Emergency Management Agency. 2020. Flood Zones. (Last updated July 8). Available:
https://www.fema.gov/glossary/flood-zones. Accessed: January 2023.
Redtail Consulting. 2021 a. Annual Sanitary Sewer Repairs 2021, 2022, & 2023 Projects - 2021 Construction Package Statutory Exemption Screening. (September.) Prepared for Mott MacDonald, San Jose, CA and City of Santa Clara. Fremont, CA.
Redtail Consulting. 2021 b. Annual Sanitary Sewer Repairs 2021, 2022, & 2023 Projects - 2021 Construction Package Categorical Exemption Screening. (October.) Prepared for Mott MacDonald, San Jose, CA and City of Santa Clara. Fremont, CA.
4 Redtail Consulting E
Environment & Community,.
Appendix A
Sanitary Sewer Condition Assessment Repairs - Package 1 Initial Study & Proposed Mitigated Negative Declaration Public & Agency Comments
Gmail
FW: Notice of Availability: Initial Study/Mitigated Negative Declaration 1 message
Vincent Luchessi <[email protected]>
To: Anna Buising <annab@redtail-ec .com>, "Crawford, Renee" <Renee.Crawford@mottmac .com> Cc: Jane Hou <Jane .Hou@mottmac .com>
Hi Anna,
Anna Buising <[email protected]>
Tue, Jan 17, 2023 at 12:50 PM
The comment period closed last Friday. Below is the only comment I received to date. I will monitor our mail boxes for any hard copy that that might come in over the next few days, but doubt there will be anything else.
With this - could you please look into the comment below.
Thanks,
Vincent Luchessi I Senior Civil Engineer
Public Works Department
1500 Warburton Avenue I Santa Clara, CA 95050
D: (408) 615-3012 J F: (408) 985-7936
[email protected]
From: Matthew Sasaki <MSasak i@valleywater .org>
Sent: Friday, January 13, 2023 3:29 PM
To: Vincent Luchessi <[email protected]>
Subject: RE: Notice of Availability: Initial Study/Mitigated Negative Declaration Hi Vincent,
The Santa Clara Valley Water District (Valley Water) has reviewed the Notice of Availability for an Initial Study and Proposed Mitigated Negative Declaration (MND) for the Sanitary Sewer Condition Assessment Repairs - Package 1 Project, received on December 14, 2022 . Based on our review, have the following comments :
1. The discussion on Potential for Releases of Pollutants Due to Flood, Tsunami, or Seiche Inundation on page 3-66 discusses the potential release of pollutants due to tsunami , mudflows , and seiche. There is not discussion of releases due to floods. Please update the discussion to address release of pollutants due to floods. According to the Federal Emergency Management Agency (FEMA) Flood Insurance Map (FIRM) Panel 060085C0227H, Segment 100 is located in Zone X, an area with a reduced flood risk due to a levee. According to FEMA FIRM Panel 06085C0061 H, portions of segments 231, 232, 233, and 242 are in Zone X (an area with reduced flood risk due to a levee), Zone AH (a special flood hazard area with a flood depth of 5 feet), and Zone AO (a special flood hazard area with a flood depth of 1 foot).
2. Valley Water does not have any right of way or facilities at the project sites ; therefore in accordance with Valley Water's Water Resources Protection Ordinance, a Valley Water encroachment permit is not required for the proposed improvements .
We appreciate the opportunity to review and comment on the Initial Study and Proposed MND for the Sanitary Sewer Condition Assessment Repairs - Package 1 Project. If you have any questions, please contact Matt Sasaki at (408) 630-3776 or msasak i@valleywater .org. Please reference File# 33804 on future correspondence regarding this project.
Thank you,
MATT SASAKI
Pronouns: he/him
Assistant Engineer II
Community Projects Review Unit
msasaki@valleywater .org
Tel. (408) 630-3776
Santa Clara Valley Water District is now known as:
♦ Valley Water
Clean Water • Healthy Environment • Flood Protection
5750 Almaden Expressway, San Jose CA 95118
www.valleywater.org
From: Vincent Luchessi <VLuchess i@SantaClaraCA .gov>
Sent: Wednesday, December 14, 202212 :29 PM
To: Vincent Luchessi <VLuchessi@SantaClaraCA .gov>
Subject: Notice of Availability : Initial Study/Mitigated Negative Declaration ••• This email originated from outside of Valley Water. Do not click links or open attachments unless you recognize the sender and know the content is safe. •••
Good Afternoon,
You are receiving this e-mail because your e-mail contact information is on the City of Santa Clara's distribution list for CEQA reviews.
Please find attached a Notice of Availability for an Initial Study and Proposed Mitigated Negative Declaration for the Sanitary Sewer Condition Assessment Repairs - Package 1 Project.
Sincerely,
Vincent Luchessi I Senior Civil Engineer
Public Works Department
1500 Warburton Avenue I Santa Clara, CA 95050
D: (408) 615-3012 J F: (408) 985-7936
vluchessi@SantaClaraCA .gov