Attachment No. 2
Bid Summary
2023 ADA CURB RAMPS PROJECT (CE 22-23-03)
BID SUMMARY
Bid Opening Date: May 11, 2023
ENGINEER’S ESTIMATE:
$ 500,860.00
Contractor
Total Bid ($)
Percentage above/below
Engineer’s Estimate
Villalobos & Associates, Inc.
$ 470,733.00
6.0% below
SBV Concrete Inc. dba Valley Concrete
$ 493,529.29
1.5% below
ASG Builders
$ 504,817.60
0.8% above
JJR Construction, Inc.
$ 528,829.50
5.6% above
Sposeto Engineering, Inc.
$ 534,201.00
6.7% above
FBD Vanguard Construction, Inc.
$ 582,423.00
16.3% above
Wattis Construction Co.
$ 689,864.00
37.7% above