PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 1 of 25
CONDITIONS OF REZONE
950 MONROE STREET MIXED-USE PROJECT
GENERAL
G1. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.
G2. Comply with all applicable codes, regulations, ordinances and resolutions.
ATTORNEY’S OFFICE
A1. The Developer agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorneys' fees, injuries, costs, and liabilities arising from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of developer's project.
COMMUNITY DEVELOPMENT
BUILDING DIVISION
BD1. Informational: Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review. Please note city staff policy that existing site addresses typically are retired. Provide digital pdf printed from design software, not scanned from printed paper sheet.
o Any building or structure that is demolished shall have its address retired and a new address/s shall be issued for the project.
BD2. I nformational: The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map: https://msc.fema.gov/portal/home . The project
drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code.
• FEMA Flood Zone map designations and requirements are based on the map in effect at date of Building Permit issuance.
BD3. Informational: The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-
w2k.com/nd_wp.shtml. All projects that disturb more than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP):
http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD). All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page:
https://www.santaclaraca.gov/our-city/departments-g-
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 2 of 25
z/public-works/environmental-programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.
BD4. Informational: no California construction code review is being done at this time. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis, including; proposed use and occupancy of all spaces (19' CBC Ch. 3), all building heights and areas (19' CBC Ch. 5), all proposed types of construction (19' CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (19' CBC Ch. 7), all proposed interior finishes fire resistance (19' CBC Ch. 8), all fire protection systems proposed (19' CBC Ch. 9), and all means of egress proposed (19' CBC Ch. 10). -Noncombustible exterior wall, floor, and roof finishes are strongly encouraged. • During construction retaining a single company to install all fire rated penetrations is highly recommended.
• The grade level lobbies shall be min.1 hour rated all sides and above. • All stair shafts shall be min. 1 hour rated.
• All elevator shafts shall be min. 1 hour rated.
• All trash chute shafts shall be min. 1 hour rated.
• Recommendation: provide a minimum of two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room.
• Any trash rooms shall be min. 1 hour rated all sides and above.
BD5. Informational: The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-site grading permit shall be a separate permit application to the Building Division.
BD6. Informational: Temporary Certificates of Occupancy will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, P.W./ Engineering, Fire Prev., Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.
BD7. Se
e Title 15 of the Santa Clara City Code for any amendments to the California Building Codes.
BD8. This project is subject to the provisions of the City of Santa Clara 2022 Reach Code, effective January 2022 See Ordinance No. 2034 and/or Title 15 of the Santa Clara City Code.
• Chp. 15.36 – Energy Code for “all electric” provisions for new construction. i. Subject to CA Energy Commission acceptance and approval and on this project’s entitlement date.
• Chp. 15.38 – Green Building Code for additional Electric Vehicle Charging requirements for new construction.
HOUSING & COMMUNITY SERVICES DIVISION
H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the affordable housing requirements and impact fee for the proposed 54 units of for-sale residential development. The Applicant shall provide not less than twenty percent (20%) of the units (or 10.8 units) to affordable households made available at affordable sales PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 3 of 25
prices to extremely low, very low, low and/or moderate-income households as long as the distribution of affordable units averages to a maximum of one-hundred (100) percent of Area Median Income. All prices are set in accordance with the City’s Below Market Purchase (BMP) Program Policies and Procedures Manual (subject to updates and changes). Applicant shall be responsible for cost incurred under the California Building Standards (California Code of Regulations, Title 24) for the each affordable for- sale residential unit. Additionally, where the calculation of affordable housing requirements results in a fractional unit, the Applicant shall either pay an In-Lieu Fee or the Applicant shall provide an additional unit to satisfy the requirement. Any in-lieu fee payment due to the City by the Applicant shall be payable prior to the issuance of the certificate of occupancy. The in-lieu fee amount shall be equal to the difference between the unrestricted appraised market value ("Initial Market Value") and the Affordable Sales Price of one of the BMP units at completion, multiplied by the fractional unit. The Initial Market Value of the last BMP unit sold shall be the basis for calculating the in-lieu fee to be paid by Applicant.
H2. Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement (AHA) with the City that will determine the Affordable Sales Price, identify the actual unit to be sold as the Affordable Unit, and apply all terms and covenants guaranteeing the prescribed affordability. Satisfaction of the affordable housing obligation shall be memorialized in the AHA and subject to City Council approval. There will be a fee for the AHA preparation in the amount of $4,020 which will be due prior to execution of the AHA.
PLANNING DIVISION
P1. Obtain required permits and inspections from the Building Official and comply with the conditions thereof. If this project involves land area of 1 acre or more, the developer shall file a Notice of Intent (NOI) with the State Water Resources Control Board prior to issuance of any building permit for grading, or construction; a copy of the NOI shall be sent to the City Building Inspection Division. A storm water pollution prevention plan is also required with the NOI.
P2. Comply with all requirements of Building and associated codes (the CBC. CEC, CMC, CPC, California Green Building Code, the California Energy Code, etc.) current at the time of application for Building Permit, that includes grading and site utility permits.
P3. It shall be the Developer's responsibility through his engineer to provide written certification that the drainage designs for the subject property will prevent flood water intrusion in the event of a storm of 100-year return period. The Developer's engineer shall verify that the site will be protected from off-site water intrusion by designing the on-site grading and storm water collection system using the 100- year hydraulic grade line elevation provided by the City's Engineering Department or the Federal Flood Insurance Rate Map, whichever is more restrictive. Said certification shall be submitted to the City Building Inspection Division prior to issuance of building permits.
P4. Prior to issuance of a demolition permit, Developer/Owner shall have an asbestos survey of the proposed site performed by a certified individual. Survey results and notice of the proposed demolition are to be sent to the Bay Area Air Quality Management District (BAAQMD). No demolition shall be performed PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 4 of 25
without a demolition permit and BAAQMD approval and, if necessary, proper asbestos removal.
P5. Incorporate Best Management Practices (BMPs) into construction plans and incorporate post construction water runoff measures into project plans in accordance with the City’s Urban Runoff Pollution Prevention Program standards prior to the issuance of permits. Proposed BMPs shall be submitted to and thereafter reviewed and approved by the Planning Division and the Building Inspection Division for incorporation into construction drawings and specifications.
P6. An erosion control plan shall be prepared and copies provided to the Planning Division and to the Building Inspection Division for review and approval prior to the issuance of grading permits or building permits that involve substantial disturbance of substantial ground area.
P7. The Final Storm Water Management Plan (SWMP) must be certified by a third- party consultant from SCVURPP’s current list of qualified consultants. Five copies of the approval letter from the certified third party review (wet stamped and signed) must be submitted prior to the issuance of grading or building permit.
P8. Prior to the issuance final occupancy, the applicant shall enter into Operations and Maintenance (O&M) agreement with the City. The project operator is responsible for the operations and maintenance of the SWMP and stormwater BMPs consistent with the O&M agreement throughout the life of the project.
P9. The Developer is required to prepare, institute, and monitor a Transportation Demand Management (TDM) Plan to reduce vehicle miles traveled by at least 20% of which at least 10% is achieved through TDM measures.
P10. The Developer shall submit the TDM plan to the Planning Division for review and approval prior to the issuance of the occupancy permit.
P11. Each calendar year after issuance of the certificate of occupancy, an annual review of the TDM plan shall be completed by a qualified third part consultant, and the third-party consultant shall submit the TDM annual report covering the prior calendar year to the Planning Division for review and approval to the satisfaction of the Director of Community Development.
P12. Trees permitted by the City for removal shall provide replacement on- or off-site at a 2:1 ratio with 24-inch box or a 1:1 with 36” box.
P13. Site landscaping shall be maintained in good condition throughout the life of the Project and no trees shall be removed without City review and approval.
P14. Developer is responsible for collection and pick-up of all trash and debris on-site and adjacent public right-of-way.
P15. Minor changes to the project would be subject to Planning Division review and approval prior to issuance of building permits.
P16. Prior to issuance of a demolition permit, Developer/Owner shall have an asbestos survey of the proposed site performed by a certified individual. Survey results and notice of the proposed demolition are to be sent to the Bay Area Air Quality Management District (BAAQMD). No demolition shall be performed without a demolition permit and BAAQMD approval and, if necessary, proper asbestos removal.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 5 of 25
P17. The developer shall submit a truck hauling route for demolition, soil, debris and material removal, and construction to the Director of Planning and Inspection for review and approval prior to the issuance of demolition and building permits.
P18. Construction activity not confined within a building shall be limited to the hours of 7:00 a.m. to 6:00 p.m. weekdays and not permitted on Saturdays and Sundays for projects within 500 feet of a residential use. Construction activity confined within a building shall be limited to the hours of 7:00 a.m. to 6:00 p.m. weekdays and 9:00 a.m. to 6:00 p.m. Saturdays for projects within 500 feet of a residential use and prohibited on Sundays. Construction activity shall not be allowed on recognized State and Federal holidays.
P19. The project shall comply with the mitigation measures identified in the Environmental Impact Report and Mitigation Measures and Reporting Program.
P20. In the event historic/prehistoric artifacts or human remains are discovered during ground disturbing activities, the following measures will be implemented: In compliance with State law (Section 7050.5 of the Health and Safety Code and Section 5097.94 of the Public Resources Code), in the event human remains are encountered during grading and construction, all work within 25 feet of the find will stop and the Santa Clara County Coroner’s office will be notified. If the remains are determined to be Native American, the Coroner will notify the Native American Heritage Commission to identify the “Most Likely Descendant” (MLD).
The City, in consultation with the MLD, would then prepare a plan for treatment, study and reinternment of the remains.
P21. In compliance with State law (Section 7050.5 of the Health and Safety Code and Section 5097.94 of the Public Resources Code), in the event that historical artifacts are found, all work within 50 feet of the find will stop and a qualified archaeologist will examine the find. All significant artifacts and samples recovered during construction would be cataloged and curated by a qualified archaeologist and placed in an appropriate curation facility. The archaeologist must then submit a plan for evaluation of the resource to the City of Santa Clara Planning Division for approval. If the evaluation of the resource concludes that the found resource is eligible for the California Register of Historic Resources, a mitigation plan must be submitted to the City of Santa Clara Planning Division for approval. The mitigation plan must be completed before earthmoving or construction activities can recommence within the designated resource area.
P22. The restrictions and rights applicable to the use, maintenance, alteration, and demolition of HT properties in Chapter 18.58, as it was in effect as of the effective date of the rezoning, will apply to the HRI properties at 906 Monroe and 930 Monroe Street, as though the properties were zoned HT. Specifically, the following sections shall be applicable to those properties:
a. 18.58.050 Conversion of residential structures to commercial use. b. 18.58.060 Architectural control.
c. 18.58.070 Demolition restriction.
To the extent that the requirements of Chapter 18.58 related to architectural review and demolition are inconsistent with the requirements of Chapter 18.106 PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 6 of 25
(Historic Preservation), or any successor ordinance, the more restrictive requirements shall apply.
P23. The developer shall prepare a protective plan for 906 and 930 Monroe Street and 945 Madison Street residences consistent with the National Park Service’s Temporary Protection notes on “Protecting A Historic Structure during Adjacent Construction.” The projective plan shall be prepared for Planning review prior to Building permit issuance and include documentation, monitoring and protective measures to prevent damage and loss of historic fabric.
FIRE
F1. Prior to Business Closure, the existing facility(s) must obtain a closure permit from the fire department
F2. Prior to Demolition Permit Issuance, a Phase II environmental assessment is required to be submitted to Community Risk Reduction Division (CRRD) of the fire department for review. If hazards are present that require site mitigation, cleanup, or management of chemical contaminants in soil, soil vapor, or groundwater a separate permit from one of the regulatory agencies below will be required. The type and extent of contamination on site(s) will govern which of the regulatory agencies noted below can supervise the cleanup:
a. Department of Toxic Substances Control (DTSC);
b. State Water Resources Control Board; or
c. Santa Clara County, Department of Environmental Health.
F3. Prior to Building Permit Issuance, a permit for Construction Safety & Demolition plan shall be submitted approved to the fire department for review and approval in compliance with our Construction Safety & Demolition standard.
F4. Prior to Building Permit Issuance, provide documentation from the City of Santa Clara Water & Sewer Department that the minimum required fire-flow can be met. Fire Department fire-flow will be based on the currently adopted California Fire Code (CFC) as amended. The maximum reduction for the installation of fire sprinklers is twenty-five percent. The most restrictive departments requirement shall apply.
F5. Prior to Building Permit Issuance, a separate construction permit for fire hydrants shall be obtained from the fire department. The required number, location and distribution of public and private fire hydrants for the building will be based on the current adoption of the CFC, Appendix C as amended. The required number of public and private fire hydrants will be based on the fire-flow before the reduction for fire sprinklers in accordance with CFC as amend. Private fire hydrants are required to be spaced around the perimeter of the building at an average spacing be more than 300 feet on center. The design is required to be modified or an alternative materials, design and methods of construction and equipment is required to be obtained prior to Building Permit issuance. The final mitigation measures will be determined at time of submittal, but the project should plan on incorporating a fire service elevator into the design.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 7 of 25
F6. Prior to Building Permit Issuance, a five-foot all-weather perimeter pathway around the entire perimeter of the buildings to facilitate firefighter access is required to be incorporated into the Building permit submittal.
F7. Prior to the issuance of the Building Permit, a construction permit from the fire department apparatus access roads is required to be submitted for review and approval. Roadways must be provided to comply with all the following requirements:
a. Fire apparatus access roadways shall be provided so that the exterior walls of the first story of the buildings are located not more than 150 feet from fire apparatus access as measured by an approved route around the exterior of the building. The design is required to be modified or an alternative materials, design and methods of construction and equipment is required to be obtained prior to Building Permit issuance. The final mitigation measures will be determined at time of submittal, but the project should plan on incorporating a fire service elevator into the design.
b. The “minimum” unobstructed vertical clearance shall not be less than 13’- 6” feet.
c. The “minimum” width of aerial roadways for aerial apparatus is 26 feet. d. The minimum inside turning radius shall be 30 feet.
e. The aerial access roadways shall be located a minimum of 15 feet and a maximum of 30 feet from the protected building.
f. Overhead utility and power lines easements shall not be located over fire apparatus access roads or between the aerial fire apparatus roads and the buildings to avoid the possibility of injury and equipment damage from electrical hazards.
g. Fire apparatus access roadways shall be all-weather surface(s) designed to support a gross vehicle weight of 75,000-pounds.
h. Trees at full development must not exceed 30 feet in height and not impair aerials apparatus operations to sweep opposing sides of a building. Other obstructions such as site lighting, bio-retention, and architectural features are reviewed case-by-case to ensure they do not obstruct aerial and ground ladder access.
i. Traffic control/calming devices are not permitted on any designated fire access roadway unless approved. A separate Fire Department permit is required for any barrier devices installed alone fire department apparatus access roads.
j. All fire department apparatus access roadways on private property are required to “be recorded” with the County of Santa Clara as Emergency Vehicle Access Easements (EVAE’s).
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 8 of 25
F8. Prior to issuance of the Building Permit, a gate permit is required to obtained.
Openings for access gates located across fire apparatus access roads shall be a minimum of 20 feet of clear width. Gates shall also be provided with a minimum unobstructed vertical clearance of 16-feet. All gates installed on designated fire department access roads must be electrically automatic powered gates. Gates shall be provided with an emergency power or be of a fail-safe design, allowing the gate to be pushed open without the use of special knowledge or equipment.
A Tomar Strobe Switch or 3M Opticom detector shall be installed to control the automatic gate(s) to allow emergency vehicles (e.g., fire, police, ems). Said device shall be mounted at a minimum height of eight to ten feet (8’ - 10’) above grade.
F9. Prior to Building Permit Issuance, design provisions must be made within the Building permit submittal for Emergency Responder Radio Coverage System (ERRCS) equipment, including but not limited to pathway survivability in accordance with Santa Clara Emergency Responder Radio Coverage System Standard.
F10. Prior to the start of construction, roadways and water supplies for fire protection are required to be installed and made serviceable and maintained throughout the course of construction.
F11. Prior to any Certificate of Occupancy Issuance (temporary or permanent), fire-life safety systems installations must be fully installed, functional, and approved. In buildings where an automatic sprinkler system is required, it shall be unlawful to occupy any portion of a building or structure until the automatic sprinkler system installation has been tested and approved. In new buildings of combustible construction where, automatic fire sprinkler systems are required to be installed, the system shall be placed in service as immediately upon the completion of sprinkler pipe installation on each floor level, the piping shall be hydrostatically tested and inspected. After inspection approval from the fire department, each floor level of sprinkler piping shall be connected to the system supply riser and placed into service with all sprinkler heads uncovered. Fire watch is not intended to facilitate occupancy during ongoing construction in a new building.
PARKS & RECREATION
PR1. This memo assumes the Project is a subdivision and the Quimby Act provisions will apply. The project will generate an estimated 130 residents (2.4 persons/household x 54 units). Based on the Quimby Act standard of 3.0 acres/1000 residents, the amount of public parkland required for this Project to mitigate the impact of the new resident demand is approximately 0.3888-acres.
The equivalent fee due in lieu of parkland dedication is therefore $2,725,272.
PR2. The existing three single-family residences on the corner of Monroe Streets and Homestead Road are not included in the calculations as they are not generating any new residents.
PR3. Any in-lieu fees imposed under this Chapter shall be due and payable to the City prior to issuance of a building permit for each dwelling unit. Final calculations will depend upon the actual number and type of units and the mix of parkland dedicated and remaining fee due, at the discretion of the City.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 9 of 25
PR4. Dwelling Unit Tax. A dwelling unit tax (DUT) is also due based on the number of units and additional bedrooms per City Code Chapter 3.15. The Project mix includes 17 one-bedroom units, 33 two-bedroom units and 4 three-bedroom units for a total DUT of $1,015
PR5. Calculations may change if the number of units change, if any areas do not conform to the Ordinance and City Code Chapter 17.35, and/or if the fee schedule for new residential development fees due in lieu of parkland dedication changes before this Project is deemed complete by Planning.
POLICE
PD1. PD1. The property should be fenced off during demolition and construction as a safety barrier to the public and deterrent to theft and other crime. Consider not having any screening material on the fence so passing Police Patrol checks will be able to see into the site.
PD2. Address numbers should be a minimum of twelve (12) inches in height for commercial or industrial buildings. Consider illuminated numbers during the hours of darkness, and in a color that is contrasting to the background material.
They shall be clearly visible from the street. Where multiple units or buildings occupy the same property, each unit/building address shall be clearly visible. A monument sign, preferably at all entrances to the property, should be prominently displayed showing all unit/building numbers, addresses, etc. A map is recommended for large complexes with multiple streets or walkways.
PD3. In a development where there is an alley, driveway, etc. providing a rear entrance or access, the address shall be displayed to both the front and rear of the individual buildings. Where an alley, driveway, etc. provided vehicular access, address numbers shall be clearly visible from that access.
PD4. Businesses with rear alley entrance doors shall be numbered with the same address numbers or suite numbers as the front doors. Numbers that are a minimum height of 4” are recommended.
PD5. There shall be positioned near the entrance an illustrative diagram of the complex, which shows the location of the viewer and unit designations within the complex, including separate building designations. This diagram shall be illuminated and should be protected by vandal and weather resistant covers.
PD6. Each distinct unit within the building shall have its address displayed on or directly above both front and rear doors.
PD7. When there is an alley or driveway to the rear of the business or commercial establishment that provides pedestrian or vehicle access, that area should be fenced and locked after hours. A ‘Knox Box’ or key coded system shall be used for police and fire emergency access.
PD8. Landscaping should follow the National Institute of Crime Prevention standards.
That standard describes bushes/shrubs not exceeding 2’ in height at maturity, or maintained at that height, and the canopies of trees should not be lower than 6’ in height. Crime deterrent vegetation is encouraged along the fence and property lines and under vulnerable windows.
PD9. Lighting for the project to be at the IES (Illuminating Engineering Society of North America) standards and include the features listed below: White light source, Pedestrian Scale, Full cut-off or shoebox design, Unbreakable exterior, PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 10 of 25
Tamperproof Housings, Wall mounted lights/10’ high. These features increase natural surveillance, support and/or enhance security camera capabilities, and increase Police Patrol effectiveness.
PD10. Any required enclosure fencing (trash area, utility equipment, etc.) would preferably be see-thru. If for aesthetic reasons prohibit that, the fencing should have a six (6) inch opening along the bottom for clear visibility. Any gates or access doors to these enclosures should be locked.
PD11. If the project includes any benches, these benches should not be longer than 5 feet in length, and should have arm rests at both ends. If the benches are longer than 5 feet in length, there should be a divider (arm rest or similar) in the middle of the bench in addition to the arm rests on both ends. This helps prevent unlawful lodging and/or skateboarding. Another option to benches could be cubes, knee walls, or other creative types of seating possibilities.
PD12. The developer should install skate stoppers on any low clearance wall of 36 inches in height or lower to prevent vandalism/damage to the wall from skateboarding or similar activities. If there is outdoor seating associated with a restaurant or similar business which is near vehicle parking stalls, the outdoor space will be designed to ensure the safety of the public from possible vehicular related incidents.
PD13. All exterior doors should be adequately illuminated at all hours with their own light source.
PD14. All construction of dwelling units shall conform to the requirements of the Uniform Building Security Code as adopted by the City of Santa Clara City Council.
PD15. All elevators should be well lit and equipped with a security mirror to provide interior and exterior visibility prior to entry or exit.
PD16. Consider convex mirrors for elevator cabs and at stairwell landings in order to enhance natural surveillance for the user of the elevator or stairs. It is highly desirable to design an elevator shaft and cab to be transparent, making occupants of the cab visible from the outside. All elevators should be well lit and equipped with a security mirror to provide interior & exterior visibility prior to entry or exit.
PD17. Other line of sight obstructions (including recessed doorways, alcoves, etc.) should be avoided on building exterior walls and interior hallways.
PD18. All business or commercial establishments, of whatever nature, should have an electronic intruder alarm system installed. The system should cover the interior and perimeter of structures determined to be a value target. Also, consideration should be given to exterior areas that are or contain value targets, such as a product display lot, company vehicle parking area, etc.
PD19. The installation and use of interior and exterior security cameras and recording devices is highly encouraged.
PD20. Exterior stairs shall be open style whenever structurally possible. The stairs should be well lit.
PD21. “White” light meeting the IES standard should be considered. There should be no “dark” areas inside the structure.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 11 of 25
PD22. The interior of the parking structure should be painted a light, highly reflective color. This increases the natural lighting available and can help prevent dark areas that attract criminal activity.
PD23. All entrances to the parking areas (structure, surface, subterranean, etc.) shall be posted with appropriate signage to discourage trespassing, unauthorized parking, etc. (See California Vehicle Code section 22658(a) for guidance) PD24. Alcoves and other visual obstructions that might constitute a hiding place should be eliminated whenever structurally possible. Pillars, columns, and other open construction should be considered over a solid wall design.
PD25. Consider storage, maintenance, and trash rooms within the parking garage having doors which cannot be locked from the inside and that close and lock quickly and automatically upon exit.
PD26. A Coded Entry System is required for police access to enclosed parking lots and gated communities. This can be accomplished with a coded key pad system or the Police Department Knox Box key system. We understand security is a prime concern for the tenants of the project, which necessitates some sort of secure building and admittance process. By having either of these secure access systems for law enforcement, it will allow us to better respond to emergency situations should they arise in the development. Examples of these systems can be reviewed at the following projects: 2585 El Camino Real (Coded key pad access) and 3555 Monroe Street (Knox box key access)
PD27. Public Safety Radio Systems Penetration Guidelines have been established by the city of Santa Clara Communications Department for radio signal penetration during emergencies. The developer is advised that the project may be required to install equipment for adequate radio coverage for the City Of Santa Clara Radio communications System, including but not limited to Police & Fire emergency services. The developer should contact the director of communications at (408) 615-557 (for high rises).
PD28. When in the opinion of the fire code official, a new structure obstructs the line of sight of emergency radio communications to existing buildings or to any other locations, the developer of the structure shall provide and install the radio retransmission equipment necessary to restore communications capabilities. The equipment shall be located in an approved space or area within the new structure.
PD29. Applicant shall contact the Santa Clara Police Department ‘Permits” unit (408- 615-4868) for regulated activity special licensing requirements.
PD30. Applicant shall contact the Santa Clara Police Department ‘Intelligence” unit (408-615-4849) for Alcohol Beverage Control (ABC) licensing review.
PD31. The business shall undergo a 6 month and 1 year review, including a check for ABC violations and police service calls.
PD32. Applicant shall contact the Santa Clara Police Department ‘Intelligence” unit (408-615-4849) for entertainment permit requirements.
PD33. All business or commercial establishments, of whatever nature, should have a comprehensive internal security plan, tailored to the specific use. This should include, but not limited to, employee security during working hours, after hours security, disaster preparation, etc. For retail uses, especially where there is cash PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 12 of 25
on hand, robbery and cash security protocols should be established. Applicants are encouraged to contact the Santa Clara Police Department’s Community Services Unit (408-615-4859) for assistance.
PUBLIC WORKS
ENGINEERING
E1. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be identified for compliance during the site clearance process. Contact Public Works Department at (408) 615-3000 for further information.
E2. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.
E3. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.
E4. The sanitary sewer (SS) discharge information (i.e., building use, square footage, point of connection to the public system, and 24-hour average and peak SS flow graphs for the peak day, showing average daily and peak daily SS flows) submitted by the developer was added 3/31/2021 to the City’s Sanitary Sewer Hydraulic Model (SSHM) to determine if there is enough SS conveyance capacity in the SS trunk system to accommodate the proposed development. The SSHM output indicates that there should be enough SS conveyance capacity to accommodate the proposed development. The SSHM output may change based on pending development applications and future projects. The SSHM output does not guarantee or in any way reserve or hold SS conveyance capacity until developer has Final Approval for the project. For purposes of this condition, “Final Approval” shall mean the final vote of the City Council necessary for all entitlements to be approved, unless a legal challenge is brought to the Council decisions, in which case the Final Approval shall mean the final disposition of the legal challenge.
E5. Developer shall provide a complete storm drain study for the 10-year and 100- year storm events. The grading plans shall include the overland release for the 100-year storm event and any localized flooding areas. System improvements, if needed, will be at Developer’s expense.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 13 of 25
E6. Sanitary sewer and storm drain mains and laterals shall be outside the drip line of mature trees or ten (10) feet clear of the tree trunk, whichever is greater, to the satisfaction of the City Engineer.
E7. Provide root barriers when the drip line of the mature trees covers the sidewalk.
Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barriers for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.
E8. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.
E9. Dedicate, as needed, on-site easements for new sidewalk, and any other new utilities by means of subdivision map or approved instrument at time of development and pay applicable processing fee.
E10. If requested, Developer/property owner shall prepare and submit for City approval a maintenance plan for all sidewalk, curb and gutter, landscaping and irrigation system improvements installed within the public right-of-way prior to encroachment permit issuance. Such plan shall include at a minimum, maintenance requirements for trees and shrubs, in acknowledgement of developer’s/property owner’s obligation under Chapter 12.30 and 17.15.
E11. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.
E12. Entire width of Homestead Road along the project frontage shall be slurry sealed with digouts. Entire width of Monroe Street and Franklin Street along the project frontage shall be 2” grind and overlayed with digouts. If the encroachment permit for the Project’s off-site improvements is not submitted within two (2) years of Final Approval for the Project, the required pavement treatment is subject to revision per the City's pavement program recommendations at the time of encroachment permit issuance. For purposes of this condition, “Final Approval” shall mean the final vote of the City Council necessary for all entitlements to be approved, unless a legal challenge is brought to the Council decisions, in which case the Final Approval shall mean the final disposition of the legal challenge.
Refer to https://www.santaclaraca.gov/our-city/departments-g-z/public- works/maintenance-operations/street-maintenance/pavement-preservation- ordinance for more information.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 14 of 25
E13. Visual obstructions over three feet in height will not be allowed within the driver's sight triangle near driveways and intersections in order to allow an unobstructed view of oncoming traffic.
E14. On-street parking shall not be counted toward on-site parking requirements.
E15. All proposed driveways shall be per City Standard ST- 8 for Lot 1.
E16. All proposed driveways shall be per City Standard ST-5 for Lots 2 and 3.
E17. Provide pedestrian ADA walkways from proposed buildings to public sidewalk and parking areas.
E18. Provide a 10’ min. sidewalk with 5’ foot planter strip along Monroe new building frontage.
E19. Provide 5’ minimum sidewalk along Homestead and Franklin frontages.
E20. Unused driveways in the public right-of-way shall be replaced with City standard curb, gutter, and sidewalk per City Standard Detail ST-12.
E21. For current proposed retail, restaurant, and housing units, the following minimum bicycle facilities shall be provided at the main entrance and/or high visible areas:
E22. 61 housing units: 20 Class I Bike Locker spaces and 4 Class II Bike Rack spaces E23. 2,000 sq. ft. retail: 1 Class I Bike Locker space per 30 employees and 4 Class II bike Rack spaces
E24. Provide loading/unloading zone on-site. No loading zone will be allowed on- street.
E25. Provide trash pick-up and drop areas on-site.
E26. Maintain existing roadway signage along Monroe, Franklin, and Homestead project frontages.
E27. Provide one ADA compliant curb ramp at the southwest corner of Monroe Street and Franklin Street and two ADA compliant curb ramps at the southwest corner of Homestead Road and Monroe Street.
E28. Maintain the existing 5-foot Class II bicycle lane on Monroe along entire frontage.
E29. Reconstruct traffic signal at the Monroe/Homestead intersection to bring signal, poles, and underground infrastructure to current ADA, City and Caltrans Standards. This will include installing a leading pedestrian interval crossing Monroe Street, countdown timer, Bluetooth velocity reader, CCTV, and an accessible pedestrian signal.
E30. All proposed traffic striping, messages, and symbols shall be thermoplastic.
E31. Proposed curb radius at Monroe/Homestead intersection is too wide. Curb radius at this intersection should be 15 to 20 feet maximum.
E32. Enhanced crosswalk markings as shown in Figure 3B-17 (CA) contained in the CA Manual on Uniform Traffic Control Devices (CA MUTCD) and shown in Figure 1 within the memorandum by Hexagon Consultants titled “Pedestrian Crossing Study for Crosswalk Enhancements on Monroe Street in Conjunction with the Proposed Mixed-Use Project at 906 Monroe Street in Santa Clara, PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 15 of 25
California” dated April 1, 2021 shall be installed at the Franklin and Monroe intersection. Bulb-outs shall be installed at the intersections of Monroe/Homestead and Monroe/Franklin. They shall have a gentle “S” curve and no sharp corner/curve and straight line allowed. Bulb-outs on Monroe side shall not encroach into the existing bike lane. Minimum bike lane width is 5’.
Gutter pan shall not be used as part of the bike lane width.
E33. Bike lane striping/messages destroyed/damaged at the proposed bulb-outs at Monroe/Franklin and Monroe/Homestead shall be replaced with thermoplastic striping/messages.
E34. Per Santa Clara Technical Guidelines ST-8 drawing, the maximum width allowed for residential/commercial driveways is 30 feet. The revised site plan shows the driveway on Franklin as 48’ feet wide, please revise to meet ST-8 standards.
E35. The project shall comply with all requirements contained within the Downtown Precise Plan, once approved by City Council.
STREETS DIVISION
Landscape
L1. Include City of Santa Clara Tree Preservation/City Arborist specifications on all improvement plans.
L2. No cutting of any part of public or private trees, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).
L3. Identified existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City of Santa Clara prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.
L4. Tree replacement ratio shall be 2:1 with minimum box size replacements. If project can’t meet the 2:1 replacement ratio, in-lieu fees must be paid prior to issuance of building permit.
Solid Waste
. The applicant shall complete and provide the Post-Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type. Contact the Public Works Department at [email protected] or (408) 615-3080 for more information.
SW2. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, trash enclosures and trash staging areas.
The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 16 of 25
SW3. For projects that involve construction, demolition or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section 8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list.
Applicant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/.
SW4. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and construction activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required.
SW5. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Insert the General Notes for the Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.
SW6. This property falls within the City’s exclusive franchise hauling area. The applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.
SW7. All refuse from all residential, commercial, industrial and institutional properties within the city shall be collected at least once a week, unless otherwise approved in writing (SCCC 8.25.120). Garbage service level required for residential developments (single-family and multi-family) as well as motels and hotels shall be no less than twenty (20) gallons per unit. All project shall submit to the Public Works Department the preliminary refuse service level assessment for approval.
Stormwater
Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.
• Applicant to provide an updated Special Projects Narrative that identifies TOD credit as 45%.
ST2. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter shall be submitted with the Plan.
ST3. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 17 of 25
under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).
ST4. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans.
ST5. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.
ST6.
During the construction phase, all stormwater control measures shall be inspected for conformance to approved plans by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party concurrence letter on the C.3 facilities construction shall be submitted to the Public Works Department. The City reserves the right to review the 3rd party inspection reports on the C.3 stormwater facilities installation.
ST7. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).
ST8. As-Built drawing shall be submitted to the Public Works Department. Include C.3 Stormwater Treatment Facilities Construction general notes on the improvement plans.
ST9. Permeable Pavement, Media Filter vaults, Interceptor Trees and Trash Full Capture Devices shall be inspected by a third-party reviewer and/or manufacturer representative for conformance with the details and specifications. If necessary, percolation test shall be performed to ensure proper installation. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.
ST10. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).
ST11. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Dept. - Environmental Services at (408) 615-3080 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter vaults and full trash capture devices is to be done annually by December 31 of each year.
ST12. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 18 of 25
ST13. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.
ST14. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.
ST15. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.
ST16. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.
ST17. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.
ST18. The use of architectural copper is discouraged. If such material is used, all wastewater generated by the installation, cleaning, treating, or washing of the surface of copper architectural features, including copper roofs, shall not be discharged to the City’s storm drain system.
SILICON VALLEY POWER
SVP1. Townhome meters are being served within the same electrical room as the other building or customer owned conduits and cables will need to run to an SVP pull box along the frontage.
SVP2. Property Lines are being removed as shown in tentative parcel map.
SVP3. Pole 37C11 is to remain. Will need a 15-20’ lead down guy & anchor for this pole.
SVP4. Pole with light can be remove once pole 37C12 is removed. The area/street lighting is the projects responsibility to maintain while new SVP street lighting system can be installed/energized per detailed design.
SVP5. Offsite duct banks crossing Franklin road & Monroe road shall be designed, installed and paid for by the developer.
SVP6. All streetlight, secondary, and UE (Fiber) systems to be designed during detailed design.
SVP7. Clearances: (Make sure job notes do not conflict with SVP clearance requirements)
a. EQUIPMENT
i. Ten (10) foot minimum clearance is required in front of equipment access doors. (UG1000 sheet 11)
ii. Five (5) foot minimum clearance from pad is required on sides without equipment access doors. (UG1000 sheet 11)
iii. Eighteen (18) foot minimum width, shall be provided and maintained on one side of the equipment pad to allow an electric dept. line truck to drive up next to the pad for installation and maintenance of equipment. (UG1000 Sheet 11).
iv. Barrier pipes are required only on sides accessible to vehicles. (UG1000 Sheet 12).
1. Thirty (30) inches from side of equipment sides.
2. Forty Eight (48) inches in front of access doors.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 19 of 25
a. Barrier Pipes in front of access doors shall be
removable.
b. CONDUITS
i. Five (5) foot minimum longitudinal clearance between new conduits or piping systems (open trench installation) and any existing or proposed SVP conduit system. This is for longitudinal. (UG1250 sheet 5)
ii. Twelve (12) inch minimum vertical clearance between new conduit/pipes installed perpendicular to existing SVP conduits for open trench installations. (UG1000 sheet 36, UG1250 Sheet 6) iii. Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7)
iv. Three (3) foot minimum clearance is required between sign posts, barrier pipes or bollards, fence posts, and other similar structures. ( UG1250 sheet 10).
v. Five (5) foot minimum from new splice boxes, pull boxes, manholes, vaults, or similar subsurface facilities. (UG1000 sheet 8) vi. Five (5) foot minimum clearance from walls, footings, retaining wall, landscape planter, tree root barrier or other subsurface wall or structure. (UG1250 sheet 9).
vii. Five (5) foot minimum clearance is required between fire hydrant thrust block. The thrust block extends 5’ foot on either side of the fire hydrant in line with the radial water pipe connected to the hydrant.
c. VAULTS/MANHOLES
i. Ten (10) foot minimum clearance is required between adjacent Vaults or Manholes.
ii. Five (5) foot minimum clearance is required between adjacent conduits.
iii. Minimum 36” from face of curb, or bollards required. d. Poles (Electrolier, Guy Stub poles, service clearance poles, self- supporting steel poles and lighting poles.)
i. Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7)
e. Guy Anchors
i. Five (5) foot minimum clearance is required between center of anchor line and any excavation area. (UG1250 sheet 15). f. Trees
i. OH 1230 for Overhead Lines
ii. SD 1235 for Tree Planting Requirements near UG Electric Facilities SVP8. Reference listed SVP standards for clearances.
a. Installation of Underground Substructures by Developers b. UG1250 – Encroachment Permit Clearances from Electric Facilities c. UG0339 – Remote Switch Pad
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 20 of 25
d. OH1230 – Tree Clearances From Overhead Electric Lines e. SD1235 – Tree Planting Requirements Near Underground Electric Facilities
SVP9. Prior to submitting any project for Electric Department review, applicant shall provide a site plan showing all existing utilities, structures, easements and trees. Applicant shall also include a “Load Survey” form showing all current and proposed electric loads. A new customer with a load of 500KVA or greater or 100 residential units will have to fill out a “Service Investigation Form” and submit this form to the Electric Planning Department for review by the Electric Planning Engineer. Silicon Valley Power will do exact design of required substructures after plans are submitted for building permits.
SVP10. The Developer shall provide and install electric facilities per Santa Clara City Code chapter 17.15.210.
SVP11. Electric service shall be underground. See Electric Department Rules and Regulations for available services.
SVP12. Installation of underground facilities shall be in accordance with City of Santa Clara Electric Department standard UG-1000, latest version, and Santa Clara City Code chapter 17.15.050.
SVP13. Underground service entrance conduits and conductors shall be “privately” owned, maintained, and installed per City Building Inspection Division Codes.
Electric meters and main disconnects shall be installed per Silicon Valley Power Standard MS-G7, Rev. 2.
SVP14. The developer shall grant to the City, without cost, all easements and/or right of way necessary for serving the property of the developer and for the installation of utilities (Santa Clara City Code chapter 17.15.110).
SVP15. If the “legal description” (not “marketing description”) of the units is condominium or apartment, then all electric meters and services disconnects shall be grouped at one location, outside of the building or in a utility room accessible directly from the outside. If they are townhomes or single-family residences, then each unit shall have it’s own meter, located on the structure. A double hasp locking arrangement shall be provided on the main switchboard door(s). Utility room door(s) shall have a double hasp locking arrangement or a lock box shall be provided. Utility room door(s) shall not be alarmed.
SVP16. If transformer pads are required, City Electric Department requires an area of 17’ x 16’-2”, which is clear of all utilities, trees, walls, etc. This area includes a 5’-0” area away from the actual transformer pad. This area in front of the transformer may be reduced from a 8’-0” apron to a 3’-0”, providing the apron is back of a 5’-0” min. wide sidewalk. Transformer pad must be a minimum of 10’- 0 from all doors and windows, and shall be located next to a level, drivable area that will support a large crane or truck.
SVP17. All trees, existing and proposed, shall be a minimum of five (5) feet from any existing or proposed Electric Department facilities. Existing trees in conflict will have to be removed. Trees shall not be planted in PUE’s or electric easements.
SVP18. Any relocation of existing electric facilities shall be at Developer’s expense.
SVP19. Electric Load Increase fees may be applicable.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 21 of 25
SVP20. The developer shall provide the City, in accordance with current City standards and specifications, all trenching, backfill, resurfacing, landscaping, conduit, junction boxes, vaults, street light foundations, equipment pads and subsurface housings required for power distribution, street lighting, and signal communication systems, as required by the City in the development of frontage and on-site property. Upon completion of improvements satisfactory to the City, the City shall accept the work. Developer shall further install at his cost the service facilities, consisting of service wires, cables, conductors, and associated equipment necessary to connect a customer to the electrical supply system of and by the City. After completion of the facilities installed by developer, the City shall furnish and install all cable, switches, street lighting poles, luminaries, transformers, meters, and other equipment that it deems necessary for the betterment of the system (Santa Clara City Code chapter 17.15.210 (2)).
SVP21. Electrical improvements (including underground electrical conduits along frontage of properties) may be required if any single non-residential private improvement valued at $200,000 or more or any series of non-residential private improvements made within a three-year period valued at $200,000 or more (Santa Clara City Code Title 17 Appendix A (Table III)).
SVP22. Non-Utility Generator equipment shall not operate in parallel with the electric utility, unless approved and reviewed by the Electric Engineering Division. All switching operations shall be “Open-Transition-Mode”, unless specifically authorized by SVP Electric Engineering Division. A Generating Facility Interconnection Application must be submitted with building permit plans.
Review process may take several months depending on size and type of generator. No interconnection of a generation facility with SVP is allowed without written authorization from SVP Electric Engineering Division.
SVP23. Encroachment permits will not be signed off by Silicon Valley Power until Developers Work substructure construction drawing has been completed.
SVP24. All SVP-owned equipment is to be covered by an Underground Electric Easement (U.G.E.E.) This is different than a PUE. Only publically-owned dry utilities can be in a UGEE. Other facilities can be in a joint trench configuration with SVP, separated by a 1’ clearance, providing that they are constructed simultaneously with SVP facilities. See UG 1000 for details.
SVP25. Proper clearance must be maintained from all SVP facilities, including a 5’ clearance from the outer wall of all conduits. This is in addition to any UGEE specified for the facilities. Contact SVP before making assumptions on any clearances for electric facilities.
SVP26. Transformers and Switch devices can only be located outdoors. These devices MAY be placed 5’ from an outside building wall, provided that the building wall in that area meets specific requirements. (See UG 1000 document for specifics) EXAMPLE: If there are any doors, windows, vents, overhangs or other wall openings within 5’ of the transformer, on either side, then the transformer MUST be 10’ or more away from the building. These clearances are to be assumed to be clear horizontally 5’ in either direction and vertically to the sky.
SVP27. All existing SVP facilities, onsite or offsite, are to remain unless specifically addressed by SVP personnel by separate document. It is the Developers PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 22 of 25
responsibility to maintain all clearances from equipment and easements.
Developer to contact SVP outside of the PCC process for clear definitions of these clearance requirements. Developer should not assume that SVP will be removing any existing facilities without detailed design drawings from SVP indicating potential removals. Simply indicating that SVP facilities are to be removed or relocated on conceptual plans does not imply that this action has been approved by SVP.
SVP28. SVP does not utilize any sub-surface (below grade) devices in its system. This includes transformers, switches, etc.
SVP29. All interior meter rooms at ground level are to have direct, outside access through only ONE door. Interior electric rooms must be enclosed in a dedicated electric room and cannot be in an open warehouse or office space.
SVP30. High Rise Metering and Multi-Floor Infrastructure Requirements a. Refer to UG0250 – High Density Residential Metering Requirements b. Refer to FO-1901 – Fiber Optic Splicing and Testing Methods SVP31. SVP’s largest 120/208V transformer is 750KVA.
SVP32. SVP’s largest 277/480V transformer is 2000KVA.
SVP33. In the case of podium-style construction, all SVP facilities and conduit systems must be located on solid ground (aka “real dirt”), and cannot be supported on parking garage ceilings or placed on top of structures.
SVP34. Applicant is advised to contact SVP (CSC Electric Department) to obtain specific design and utility requirements that are required for building permit review/approval submittal. Please provide a site plan to Leonard Buttitta at 408-615-6620 to facilitate plan review.
WATER & SEWER
W1. Recycled Water Use: Pursuant to Chapter 13.15, Water, Article IV. Regulation of Recycled Water Service and Use, of the Municipal Code, the project is required to use recycled water for all non-potable uses where recycled water is made available and where provided for by Recycled Water regulations. This project is required to extend and connect to the City’s existing Recycled Water System.
W2. Potable Water Redundancy: For all onsite industrial water use that requires uninterrupted service, the project shall provide a potable water back-up supply source that complies with all recycled water separation requirements.
W3. Recycled Water Design: Each Recycled Water land use (irrigation, dual- plumbing, cooling system, industrial processes, etc.) shall have a separate metered service connection to the main. Applicant shall verify separations between all potable/fire lines and recycled water lines, pipe type, pipe depths, equipment types, warning lids, tags and signs.
W4. On-site Recycled Water Construction: Construction and installation of all on-site recycled water system equipment shall not begin until the Compliance Division of Water and Sewer Utilities has approved the on-site recycled water design.
Please note on-site designs are generally not the same as the Building Permit plans. On-site recycled water plans require SBWR and California State Water Resources Control Board, Division of Drinking Water signatures for final approval.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 23 of 25
W5. On-site Recycled Water Inspection: Inspections are required at all on-site recycled water systems being installed prior to backfilling trenches or cover in walls and ceilings. Request a recycled water inspection by email [email protected] or call (408) 615-2002. Please provide the site location, SBWR project ID, and date and time preferences. These inspections are in addition to the Building Permit inspections. a. Need to verify separations between all potable/fire lines and recycled water lines, pipe type, pipe depths, equipment types, warning lids, tags and signs.
W6. Recycled Water Main: The applicant shall install a new 12" DIP pipe recycled water main from the point of connection point on Madison and extend it to the site.
W7. Encroachment Permit: Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.
W8. Utility Design Plans: Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details. Note that all new water meters and backflow prevention devices shall be located behind the sidewalk in a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.
W9. Utility Separations: Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services: 10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water services, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 24 of 25
W10. Separate Services: Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right-of-way to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.
W11. City Standard Meters and Backflows: All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.
W12. Existing Services: The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.
W13. Fats, Oil and Grease (FOG): All food service land uses conducting commercial cooking operations including dishwashing activities and equipment cleaning that generate grease-laden wastewater are subject to review from the Water and Sewer Utilities Department, for FOG Control and grease interceptor installation requirements. All food service projects are required to have an approved stamp from the Santa Clara County Department of Environmental Health before plans can be accepted for review. Contact Compliance Division of the Water and Sewer Utilities at (408) 615-2002 for a Food Service Checklist to initiate the process. Items to address include: future maintenance agreements, identification of proposed plumbing and equipment, calculation for proposed grease control devise(s), identification of proposed grease control device(s), and waste/recycling/tallow storage.
W14. On-Site Storm Drain Treatment: Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system.
The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system.
W15. Water Usage: Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).
W16. Landscaping: All the landscaping for the project shall comply with the California Water Conservation in Landscaping Act, Government Code Section 65591 et. seq. All plants shall be California native, non-invasive, low water-using or moderate water-using. High water-using plants and nonfunctional turf are prohibited.
PLN2020-14457 950 Monroe Street Mixed-use Project
Conditions of Approval for Rezone 25 of 25
W17. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities. Decorative water features may be permanently connected to the City’s recycled water supply.
W18. Easements: Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite. The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-of-way without overlapping any public utility easement.
Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.
W19. Underground Fire Permit: Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408) 615-2000.
A dedicated fire service line, with an approved backflow prevention device, shall be used for on-site fire hydrants. Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.
W20. Record Drawings: Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as-built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the Director of Water & Sewer Utilities Department.
W21. Water Shortage Response Actions: Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.
Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control. b. restrict the use of potable water used for construction and dust control if recycled water is available.