Cities Index.
Agenda packet

City Council and Authorities Concurrent
October 24, 2023

Document
Agenda packet
Meeting
October 24, 2023
Body
City Council and Authorities Concurrent
Pages
30
Original file
64.3 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar.com. That file is the official record.

Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would, until January 1, 2030, exempt from the the California Environmental Quality Act (CEQA) egress route projects undertaken by a public agency to improve emergency access to and evacuation from a subdivision without a secondary egress route if the State Board of Forestry and Fire Protection has recommended the creation of a secondary access to the subdivision and certain conditions are met. The bill would require the lead agency to hold a noticed public meeting to hear and respond to public comments before determining that a project is exempt. The bill would require the lead agency, if it determines that a project is not subject to CEQA and approves or carries out that project, to file a notice of exemption with the Office of Planning and Research and with the clerk of the county in which the project will be located.

Position

AB 1168 (Bennett D)   Emergency medical services (EMS): prehospital EMS.

Current Text: Amended: 7/13/2023    html   pdf
Introduced: 2/16/2023
Last Amend: 7/13/2023
Status: 9/14/2023-Failed Deadline pursuant to Rule 61(a)(14). (Last location was INACTIVE FILE on 9/12/2023)(May be acted upon Jan 2024)
Location: 9/14/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk Policy Fiscal 2 year Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Emergency Medical Services System and the Prehospital Emergency Medical Care Personnel Act governs local emergency medical services (EMS) systems and authorizes each county to develop an EMS program and designate a local EMS agency. Current law requires a county to enter into a written agreement with a city or fire district that contracted for or provided prehospital EMS as of June 1, 1980. Current law requires, until that written agreement is reached, prehospital EMS to be continued at not less than the existing level and the administration of prehospital EMS by cities and fire districts contracting for or providing those services as of June 1, 1980, to be retained by those cities and fire districts. This bill would require a city to be treated as if it had retained its authorities regarding, and the administration of, prehospital EMS if specified requirements are met.

Position

SB 504 (Dodd D)   Wildfires: defensible space: grant programs: local governments.

Current Text: Amended: 4/20/2023    html   pdf
Introduced: 2/14/2023
Last Amend: 4/20/2023
Status: 7/14/2023-Failed Deadline pursuant to Rule 61(a)(10). (Last location was NAT. RES. on 5/11/2023)(May be acted upon Jan 2024)
Location: 7/14/2023-A. 2 YEAR
Desk Policy Fiscal Floor Desk 2 year Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law requires the Director of Forestry and Fire Protection to establish a common reporting platform that allows defensible space and home hardening assessment data, collected by the qualified entities, to be reported to the department. Current law requires the department to establish a local assistance grant program for fire prevention and home hardening education activities and provides that local agencies, among others, are eligible for these grants. Current law requires the State Fire Marshal to identify areas of the state as moderate, high, and very high fire hazard severity zones based on specified criteria. Current law requires a local agency to designate, by ordinance, moderate, high, and very high fire hazard severity zones in its jurisdiction within 120 days of receiving recommendations from the State Fire Marshal, and authorizes a local agency, at its discretion, to include areas within the jurisdiction of the local agency, not identified as moderate, high, and very high fire hazard severity zones by the State Fire Marshal, as moderate, high, and very high fire hazard severity zones, respectively. This bill would require the department, when reviewing applications for the local assistance grant program, to give priority to any local governmental entity that is qualified to perform defensible space assessments in very high and high fire hazard severity zones who reports that information using the common reporting platform, as provided.

Position

Energy Legislation, Regulations and Issues LAP

Page 2 ends

AB 1176 (Zbur D)   General plans: Local Electrification Planning Act.

Current Text: Amended: 5/26/2023    html   pdf
Introduced: 2/16/2023
Last Amend: 5/26/2023
Status: 7/14/2023-Failed Deadline pursuant to Rule 61(a)(10). (Last location was GOV. & F. on 6/14/2023)(May be acted upon Jan 2024)
Location: 7/14/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk 2 year Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Planning and Zoning Law requires a city or county to adopt a comprehensive general plan for the city’s or county’s physical development that includes various elements, including, among others, a land use element that designates the proposed general distribution and general location and extent of the uses of the land in specified categories, and a circulation element that identifies the location and extent of existing and proposed major thoroughfares, transportation routes, terminals, any military airports and ports, and other local public utilities and facilities, as specified. This bill, the Local Electrification Planning Act, would require a city, county, or city and county to prepare and adopt a specified plan, or otherwise integrate a plan into the general plan, that, among other things, identifies opportunities to expand electric vehicle charging to meet the needs of the city’s, county’s, or city and county’s current and future visitors, residents, and businesses, and includes policies and implementation measures that address the needs of disadvantaged communities, low-income households, and small businesses for investments in zero-emission technologies that directly benefit these groups, as specified.

Position

AB 1594 (Garcia D)   Medium- and heavy-duty zero-emission vehicles: public agency utilities.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 9/1/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law establishes the Air Quality Improvement Program that is administered by the State Air Resources Board for purposes of funding projects related to, among other things, the reduction of criteria air pollutants and improvement of air quality, and establishes the Medium- and Heavy-Duty Zero-Emission Vehicle Fleet Purchasing Assistance Program within the Air Quality Improvement Program to make financing tools and nonfinancial supports available to operators of medium- and heavy-duty vehicle fleets to enable those operators to transition their fleets to zero- emission vehicles. This bill would require any state regulation that seeks to require, or otherwise compel, the procurement of medium- and heavy-duty zero-emission vehicles to authorize public agency utilities to purchase replacements for traditional utility-specialized vehicles that are at the end of life when needed to maintain reliable service and respond to major foreseeable events, including severe weather, wildfires, natural disasters, and physical attacks, as specified. The bill would define a public agency utility to include a local publicly owned electric utility, a community water system, a water district, and a wastewater treatment provider, as specified.

Position
Support

AB 1614 (Gabriel D)   Retail gasoline fueling stations: alternative fuels transition: study.

Current Text: Enrollment: 9/20/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 9/1/2023
Status: 9/20/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/20/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require the State Energy Resources Conservation and Development Commission (Energy Commission), in coordination with the State Air Resources Board and the Governor’s Office of Business and Economic Development, and in consultation with local air districts and local governments, to, upon appropriation by the Legislature, conduct a study on the transitioning of retail gasoline fueling stations to provide alternative fuels, as defined, by a specified date and to convene, before initiating the study, specified state and local agencies, and other relevant stakeholders, to determine the scope of the study. The bill would require the study to include an assessment of opportunities for, and barriers to, deploying alternative fueling infrastructure at retail gasoline fueling stations and identify

Page 3 ends

the potential financial incentives and regulatory barriers for retail gasoline fueling stations to install, or replace gasoline fueling infrastructure with, alternative fueling infrastructure. The bill would require the Energy Commission to deliver the study to the Legislature no later than January 1, 2027. The bill would repeal its provisions on January 1, 2030.

Position

SB 493 (Min D)   Air pollution: alternative vehicles and electric and hydrogen infrastructure.

Current Text: Vetoed: 9/30/2023    html   pdf
Introduced: 2/14/2023
Last Amend: 6/19/2023
Status: 9/30/2023-Vetoed by the Governor. In Senate. Consideration of Governor's veto pending.

Location: 9/30/2023-S. VETOED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current  law requires the State Energy Resources Conservation and Development Commission (Energy Commission), in consultation with the State Air Resources Board (state board) and the Public Utilities Commission (PUC), to prepare a statewide assessment of fuel cell electric vehicle fueling infrastructure and fuel production needed to support the adoption of zero-emission trucks, buses, and off-road vehicles at levels necessary for the state to meet the goals and requirements of Executive Order No. N-79-20 and any state board regulatory action that requires or allows zero-emission vehicles in the heavy-duty vehicle and off-road sectors. Current law also requires the Energy Commission, working with the state board and the PUC, to prepare a statewide assessment of the electric vehicle charging infrastructure needed to support the levels of electric vehicle adoption required for the state to meet its goals of putting at least 5,000,000 zero-emission vehicles on California roads by 2030, and of reducing emissions of greenhouse gases to 40% below 1990 levels by 2030. This bill would require the assessment of the fuel cell electric vehicle fueling infrastructure and fuel production to additionally include an assessment of storage and transport facilities, and the assessment of the electric vehicle charging infrastructure to additionally include electric system infrastructure and electric generation. The bill would expand the scope of the latter assessment to include the electric vehicle charging infrastructure, electric system infrastructure, and electric generation needed for the state to meet the goals of Executive Order No. N-79-20 and any state board regulatory action that requires or allows zero-emission vehicles in the heavy-duty vehicle and off-road sectors. The bill would require both assessments to identify any barriers to the deployment of hydrogen infrastructure and any barriers to the deployment of electric infrastructure, respectively, for medium- and heavy-duty fleets and recommendations for addressing those barriers.

The bill would require the Energy Commission to publish a determination regarding the adequacy of completed or planned charging or fueling sites for the 5 years following the completion of the initial statewide assessment and the findings of the electric vehicle charging infrastructure assessment, as provided.

Position

SB 572 (Stern D)   Natural gas: prices: report.

Current Text: Amended: 9/1/2023    html   pdf
Introduced: 2/15/2023
Last Amend: 9/1/2023
Status: 9/14/2023-Failed Deadline pursuant to Rule 61(a)(14). (Last location was INACTIVE FILE on 9/14/2023)(May be acted upon Jan 2024)
Location: 9/14/2023-A. 2 YEAR
Desk Policy Fiscal Floor Desk Policy Fiscal 2 year Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require the Public Utilities Commission, on or before August 1, 2024, and in consultation with the State Energy Resources Conservation and Development Commission to the extent necessary to analyze the natural gas wholesale market and trends, to submit a report to the relevant legislative policy committees on the status, outcomes, and recommendations, if any, of the commission order described above and the status and any findings of any related investigations by the Federal Energy Regulatory Commission.

Position

Housing LAP

AB 67 (Muratsuchi D)   Homeless Courts Pilot Program.

Page 4 ends

Current Text: Amended: 3/13/2023    html   pdf
Introduced: 12/7/2022
Last Amend: 3/13/2023
Status: 9/1/2023-Failed Deadline pursuant to Rule 61(a)(11). (Last location was APPR. SUSPENSE FILE on 8/28/2023)(May be acted upon Jan 2024)
Location: 9/1/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk Policy 2 year Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would, upon an appropriation by the Legislature, create the Homeless Courts Pilot Program, which would remain in effect until January 1, 2029, to be administered by the Judicial Council for the purpose of providing comprehensive community-based services to achieve stabilization for, and address the specific legal needs of, homeless individuals who are involved with the criminal justice system. The bill would require applicant cities or counties seeking grant funds to provide a number of specified services or program components, including, but not limited to, a diversion program enabling participating defendants to have specified charges dismissed upon completion of a program, provision of temporary, time-limited, or permanent housing during the duration of the program, and a dedicated representative to assist defendants with housing needs. The bill would require an applicant for grant funding under the program to submit a plan for a new homeless court program or expansion of an existing homeless court program, and would require any funding awarded to an applicant to be used in accordance with that plan.

Position

AB 68 (Ward D)   Land use: streamlined housing approvals: density, subdivision, and utility approvals.

Current Text: Amended: 4/12/2023    html   pdf
Introduced: 12/8/2022
Last Amend: 4/12/2023
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was H. & C.D. on 3/16/2023)(May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require a local government to approve a proposed housing development pursuant to a streamlined, ministerial approval process if the development meets certain objective planning standards, including, but not limited to, a requirement that the proposed parcel for the development be a climate-smart parcel, as described, or be included in the applicable region’s sustainable communities strategy as a priority development area. The bill would set forth procedures for approving these developments and would set forth various limitations for these developments. The bill would authorize the Department of Housing and Community Development to review, adopt, amend, and repeal guidelines, rules, and regulations to implement uniform standards or criteria that supplement or clarify the terms, references, or standards set forth by this process.

Position

AB 257 (Hoover R)   Encampments: penalties.

Current Text: Amended: 2/23/2023    html   pdf
Introduced: 1/19/2023
Last Amend: 2/23/2023
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was PUB. S. on 2/2/2023) (May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Under current law, a person who lodges in a public or private place without permission is guilty of disorderly conduct, a misdemeanor. Current law also provides that a person who willfully and maliciously obstructs the free movement of any person on any street, sidewalk, or other public place is guilty of a misdemeanor. This bill would prohibit a person from camping, as defined, in a street, sidewalk, or other public property within 500 feet of a school, daycare center, playground, or youth center.

Position

AB 281 (Grayson D)   Planning and zoning: housing: postentitlement phase permits.

Current Text: Enrollment: 9/12/2023    html   pdf

Page 5 ends

Introduced: 1/24/2023
Last Amend: 4/13/2023
Status: 9/12/2023-Enrolled and presented to the Governor at 2 p.m.

Location: 9/12/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Existing law, which is part of the Planning and Zoning Law, requires a local agency to compile a list of information needed to approve or deny a postentitlement phase permit, to post an example of a complete, approved application and an example of a complete set of postentitlement phase permits for at least 5 types of housing development projects in the jurisdiction, as specified, and to make those items available to all applicants for these permits no later than January 1, 2024.

Existing law establishes time limits for completing reviews regarding whether an application for a postentitlement phase permit is complete and compliant and whether to approve or deny an application, as specified, and makes any failure to meet these time limits a violation of specified law.

Existing law defines various terms for these purposes, including "local agency" to mean a city, county, or city and county, and "postentitlement phase permit," among other things, to exclude a permit required and issued by a special district. This bill would require a special district that receives an application from a housing development project for service from a special district or an application from a housing development project for a postentitlement phase permit, as specified, to provide written notice to the applicant of next steps in the review process, including, but not limited to, any additional information that may be required to begin to review the application for service or approval. The bill would require the special district to provide this notice within 30 business days of receipt of the application for a housing development with 25 units or fewer, and within 60 business days for a housing development with 26 units or more. The bill would define various terms for these purposes. By imposing additional duties on special districts, the bill would impose a state-mandated local program.

This bill contains other related provisions and other existing laws.

Position

AB 284 (Patterson, Joe R)   Department of Housing and Community Development: annual report:

Homeless Housing, Assistance, and Prevention program.

Current Text: Introduced: 1/24/2023    html   pdf
Introduced: 1/24/2023
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was H. & C.D. on 2/2/2023)(May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Under current law, grants under the Homeless Housing, Assistance, and Prevention (HHAP) program are allocated in 4 rounds of funding, administered by the California Interagency Council on Homelessness, as provided. Current law requires the Department of Housing and Community Development to submit an annual report to the Governor and both houses of the Legislature on the operations and accomplishments during the previous fiscal year of the housing programs administered by the department. Current law requires that the report include, among other things, the number of units assisted by those programs and the number of individuals and households served and their income level. This bill would additionally require that this report include an evaluation of the HHAP program.

Position

AB 309 (Lee D)   The Social Housing Act.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 1/26/2023
Last Amend: 9/1/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would enact the Social Housing Act and would create, in the Department of General Services, the Social Housing Program, the mission of which would be to ensure that qualified social housing developments are produced on leased state property to help address the housing crisis, as specified. The bill would authorize the program to identify and develop up to 3 qualified social housing projects, as specified, with the intent to use the results to inform public policy related to developing an independent public entity to develop statewide qualified social housing. The bill would require the program to solicit bids to develop qualified social housing units, and prioritize bids that demonstrate

Page 6 ends

long-term revenue neutrality or a cost rent model, as those terms are defined. The bill would require the program to employ 2 different leasing models, the rental model and the ownership model, as specified, in creating social housing. The bill would prohibit a city or county from denying a social housing development authorized under the program. The bill would authorize a city or county to propose objective design review standards, as specified, and authorize a city or county to propose modifications to mitigate any specific, adverse impacts on public health or safety, as specified.

Position

AB 434 (Grayson D)   Housing element: notice of violation.

Current Text: Enrollment: 9/20/2023    html   pdf
Introduced: 2/6/2023
Last Amend: 9/8/2023
Status: 9/20/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/20/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law requires each county and city to adopt a comprehensive, long-term general plan for the physical development of the county or city, and specified land outside its boundaries, that includes, among other mandatory elements, a housing element. Upon adoption of a housing element or amendment to an adopted housing element, current law requires the planning agency to submit a copy to the Department of Housing and Community Development, as provided, and requires the department to evaluate the adopted housing element or amendment and report its findings to the planning agency within 90 days. This bill would, instead, require the department to review an adopted housing element or amendment and report its findings to the local planning agency within 60 days.

Position

AB 510 (Jackson D)   Public social services: purposes.

Current Text: Amended: 4/13/2023    html   pdf
Introduced: 2/7/2023
Last Amend: 4/13/2023
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was APPR. on 4/18/2023) (May be acted upon Jan 2024)
Location: 5/19/2023-A. 2 YEAR
Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law establishes various public social services programs, including, among others, CalWORKs and the State Supplementary Program for Aged, Blind and Disabled. Current law sets forth the purposes of public social services for which state grants are made to counties that include, among others, providing reasonable support and maintenance for needy and dependent families and persons.

This bill would instead state that providing reasonable support and maintenance for needy and vulnerable children, adults, and families is a purpose of public social services.

Position

AB 516 (Ramos D)   Mitigation Fee Act: fees for improvements: reports and audits.

Current Text: Enrollment: 9/13/2023    html   pdf
Introduced: 2/7/2023
Last Amend: 7/10/2023
Status: 9/13/2023-Enrolled and presented to the Governor at 3 p.m.

Location: 9/13/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Mitigation Fee Act, imposes certain requirements on a local agency that imposes a fee as a condition of approval of a development project that is imposed to provide for an improvement to be constructed to serve the development project, or a fee for public improvements, as specified. In this regard, the Mitigation Fee Act requires the local agency to deposit the fee in a separate capital facilities account or fund, and to make certain information about the account or fund public annually, as specified. The Mitigation Fee Act requires that information to include an identification of an approximate date by which the construction of the public improvement will commence if the local agency determines that sufficient funds have been collected to complete financing on an incomplete public improvement, as specified. The Mitigation Fee Act also requires that information to include the amount of refunds made to the owners of the lots or units of the development project, as specified.This bill would require the report to include an identification of each public improvement identified in a previous report,

Page 7 ends

whether construction began on the approximate date noted in the previous report, the reason for the delay, if any, and a revised approximate date that the local agency will commence construction, if applicable. The bill would also require the report to include the number of persons or entities identified to receive refunds.

Position

AB 531 (Irwin D)   The Behavioral Health Infrastructure Bond Act of 2023.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/8/2023
Last Amend: 9/11/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would provide that projects funded by the Behavioral Health Infrastructure Bond Act of 2024 that provide housing for individuals and families who are experiencing homelessness or who are at risk of homelessness and who are inherently impacted by or at increased risk for medical diseases or conditions due to the COVID-19 pandemic or other communicable diseases and are disbursed in accordance with the Multifamily Housing Program, or projects that are disbursed in accordance with the Behavioral Health Continuum Infrastructure Program, are a use by right and subject to the streamlined, ministerial review process. The bill would define use by right for these purposes to mean that the local government’s review of the project does not require a conditional use permit, planned unit development permit, or other discretionary local government review or approval that would constitute a project subject to the approval process in the California Environmental Quality Act (CEQA).

Position

AB 799 (Rivas, Luz D)   Homelessness: financing plan.

Current Text: Amended: 9/1/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 9/1/2023
Status: 9/14/2023-Failed Deadline pursuant to Rule 61(a)(14). (Last location was INACTIVE FILE on 9/12/2023)(May be acted upon Jan 2024)
Location: 9/14/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk Policy Fiscal 2 year Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require the California Interagency Council on Homelessness, in collaboration with continuums of care, counties, and big cities, as defined, and other stakeholders, to establish and regularly update a financing plan to solve homelessness by the year 2035. The bill would require the council to establish and update statewide performance metrics to reduce racial and ethnic disparities in homelessness and to increase successful exits from homelessness to permanent housing by updating the Statewide Action Plan for Preventing and Ending Homelessness in California, no later than January 1, 2025, and would require the council to publish these goals on its internet website, as specified.

Position

AB 812 (Boerner D)   Housing development approvals: reserving affordable units in or near a cultural district for artists.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 9/8/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law requires the Arts Council to establish criteria and guidelines for certification of state-designated cultural districts and collaborate with other public agencies and private entities to maximize the benefits of state-designated cultural districts. The Planning and Zoning Law imposes various requirements on cities and counties with regard to their review and approval of certain housing developments. This bill would authorize a city or county that requires, as a condition of approval, that a certain percentage of units of a residential development be affordable housing, as specified, to reserve for artists up to 10% of those required affordable housing units, except as provided, if certain conditions are met, including that the units reserved are located within or within

Page 8 ends

one-half mile from a state-designated cultural district or within a locally designated cultural district, as specified.

Position

AB 821 (Grayson D)   Planning and zoning: general plan: zoning ordinance: conflicts.

Current Text: Enrollment: 9/14/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 6/22/2023
Status: 9/14/2023-Enrolled and presented to the Governor at 4:30 p.m.

Location: 9/14/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Planning and Zoning Law requires each county and city to adopt a comprehensive, long-term general plan for the physical development of the county or city, and of certain land outside its boundaries. Current law requires that county or city zoning ordinances be consistent with the general plan of the county or city by January 1, 1974. Current law authorizes any resident or property owner to bring an action or proceeding in the superior court to enforce compliance with these provisions within 90 days of the enactment of any new zoning ordinance or the amendment of any existing zoning ordinance. Current law requires a zoning ordinance to be amended within a reasonable time so that it is consistent with the general plan in the event that the ordinance becomes inconsistent with the plan by reason of amendment to the plan. This bill would additionally authorize any resident or property owner to bring an action or proceeding in the superior court to enforce compliance with these provisions within 90 days of the failure of a local agency to amend a zoning ordinance within a reasonable time of the zoning ordinance becoming inconsistent with the general plan due to amendment to the plan or to any element of the plan.

Position

AB 932 (Ting D)   Accessory dwelling units: Accessory Dwelling Unit Program: reports.

Current Text: Chaptered: 9/8/2023    html   pdf
Introduced: 2/14/2023
Last Amend: 5/18/2023
Status: 9/8/2023-Approved by the Governor. Chaptered by Secretary of State - Chapter 169, Statutes of 2023.

Location: 9/8/2023-A. CHAPTERED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Under existing law, the California Housing Finance Agency (CalHFA) administers the Accessory Dwelling Unit Program, for the purpose of assisting homeowners in qualifying for loans to construct accessory dwelling units and junior accessory dwelling units on the homeowners' property and increasing access to capital for homeowners interested in building accessory dwelling units.

Existing law requires the CalHFA to convene a working group to develop recommendations for the program, as specified. This bill would require CalHFA to evaluate the program and report CalHFA's findings to the Legislature by January 1, 2025.

Position

AB 976 (Ting D)   Accessory dwelling units: owner-occupancy requirements.

Current Text: Enrollment: 9/19/2023    html   pdf
Introduced: 2/14/2023
Last Amend: 8/28/2023
Status: 9/19/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/19/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law requires a local ordinance to require an accessory dwelling unit to be either attached to, or located within, the proposed or existing primary dwelling, as specified, or detached from the proposed or existing primary dwelling and located on the same lot as the proposed or existing primary dwelling. Current law authorizes a local agency to require an accessory dwelling unit to be used for rentals of terms longer than 30 days. This bill, instead, would authorize a local agency to require terms that are 30 days or longer.

Position

Page 9 ends

AB 1287 (Alvarez D)   Density Bonus Law: maximum allowable residential density: additional density bonus and incentives or concessions.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/16/2023
Last Amend: 9/8/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law defines the term “density bonus” for specified purposes to mean a density increase over the otherwise maximum allowable gross residential density as of the date of the application, as described. Current law defines the term “maximum allowable residential density” for these purposes to mean the maximum number of units allowed under the zoning ordinance, specific plan, or land use element of the general plan, or, if a range of density is permitted, the maximum number of units allowed by the specific zoning range, specific plan, or land use element of the general plan applicable to the project. Current law provides under that definition that if the density allowed under the zoning ordinance is inconsistent with the density allowed under the land use element of the general plan or specific plan, the greater density prevails. This bill would instead define “maximum allowable residential density” to mean the greatest number of units allowed under the zoning ordinance, specific plan, or land use element of the general plan, or, if a range of density is permitted, the greatest number of units allowed by the specific zoning range, specific plan, or land use element of the general plan applicable to the project. The bill would also remove from that definition the provision stating that the greater density prevails if the density allowed under the zoning ordinance is inconsistent with the density allowed under the land use element of the general plan or specific plan.

This bill would require a city, county, or city and county to grant an additional density bonus, calculated as specified, when (1) an applicant proposes to construct a housing development that conforms to specified requirements, (2) the applicant agrees to include additional rental or for-sale units affordable to very low income households or moderate-income households, as specified, and (3) the housing development conforms to specified requirements and provides 24% of the total units to lower income households, conforms to specified requirements and provides 15% of the total units to very low income households, or conforms to specified requirements and provides 44% of the total units to moderate-income units. The bill would require a city, county, or city and county to grant four incentives or concessions for a project that includes at least 16% of the units for very low income households or at least 45% for persons and families of moderate income in a development in which the units are for sale. The bill would increase the incentives or concessions for a project in which 100% of all units are for lower income households, as specified, from 4 to 5.

Position

AB 1318 (Rivas, Luz D)   California Environmental Quality Act: exemption: residential projects.

Current Text: Introduced: 2/16/2023    html   pdf
Introduced: 2/16/2023
Status: 7/14/2023-Failed Deadline pursuant to Rule 61(a)(10). (Last location was E.Q. on 5/31/2023) (May be acted upon Jan 2024)
Location: 7/14/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk 2 year Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect. CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment.This bill would expand the exemption by increasing the size of a residential project that would qualify for the exemption to include a project of not more than 5 acres in total area. The bill would require a lead agency approving an exempt residential project on an urbanized infill site to file a notice of exemption with the Office of Planning and Research, as specified. This bill contains other related provisions and other existing laws.

Position

AB 1332 (Carrillo, Juan D)   Accessory dwelling units: preapproved plans.

Current Text: Enrollment: 9/15/2023    html   pdf
Introduced: 2/16/2023
Last Amend: 8/29/2023

Page 10 ends

Status: 9/15/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/15/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Planning and Zoning Law authorizes a local agency, by ordinance or ministerial approval, to provide for the creation of accessory dwelling units in areas zoned for residential use, as specified. Current law authorizes a local agency to impose standards on accessory dwelling units that include, but are not limited to, parking, height, setback, landscape, architectural review, and maximum size of a unit. This bill would require each local agency, by January 1, 2025, to develop a program for the preapproval of accessory dwelling unit plans, whereby the local agency accepts accessory dwelling unit plan submissions for preapproval and approves or denies the preapproval applications, as specified. The bill would authorize a local agency to charge a fee to an applicant for the preapproval of an accessory dwelling unit plan, as specified. The bill would require the local agency to post preapproved accessory dwelling unit plans and the contact information of the applicant on the local agency’s internet website. The bill would require a local agency to either approve or deny an application for a permit for a proposed accessory dwelling unit within 30 days that utilizes either an accessory dwelling unit plan preapproved within the current triennial California Building Standards Code rulemaking cycle or a plan that is identical to a plan used in an application for a detached accessory dwelling unit approved by the local agency within the current triennial California Building Standards Code rulemaking cycle.

Position

AB 1469 (Kalra D)   Santa Clara Valley Water District.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 9/8/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Santa Clara Valley Water District Act creates the Santa Clara Valley Water District, and authorizes the district to provide for the conservation and management of flood, storm, and recycled waters, and other waters, for beneficial uses and to enhance natural resources in connection with carrying out the purposes of the district. This bill would additionally authorize the district to take certain actions in order to assist unsheltered people living along streams, in riparian corridors, or otherwise within the district’s jurisdiction, in consultation with a city or the County of Santa Clara to provide solutions or improve outcomes for the unsheltered individuals. The bill would require, if the district elects to use the above-described authority, the district to provide a report to the appropriate committees of the Legislature on or before July 1, 2029, and a subsequent report on or before July 1, 2034, containing specified information, including, among other things, the district’s actions taken to assist unsheltered people. The bill would provide that the use of land by the district for these specified actions constitutes “agency’s use” for purposes of the prescribed requirements related to the disposal of surplus land by a local agency, and would make this provision operative only if SB 747 of the 2023– 24 Regular Session is enacted as provided. This bill contains other related provisions and other existing laws.

Position

AB 1485 (Haney D)   Housing element: enforcement: Attorney General.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 9/8/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Planning and Zoning Law requires each county and city to adopt a comprehensive, long-term general plan for the physical development of the county or city and requires that general plan to include, among other mandatory elements, a housing element. Existing law authorizes the Department of Housing and Community Development to notify the office of the Attorney General, that a city, county, or city and county is in violation of state law if the department finds that the housing element or an amendment to the housing element does not substantially comply with specified provisions of the Planning and Zoning Law, or that the local government has taken action or failed to act in violation of specified provisions of law relating to housing, including, among others, the Housing

Page 11 ends

Accountability Act, the Density Bonus Law, and the Housing Crisis Act of 2019.This bill would permit both the department and the office of the Attorney General to intervene as a matter of unconditional right in any legal action addressing a violation of the specified housing laws described above, including, among others, the Housing Accountability Act, the Density Bonus Law, and the Housing Crisis Act of 2019. This bill contains other existing laws.

Position

AB 1490 (Lee D)   Affordable housing development projects: adaptive reuse.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 7/10/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Under this bill, a housing development that is, among other requirements, an extremely affordable adaptive reuse project on an infill parcel that is not located on or adjoined to a site where more than 1/3 of the square footage on the site is dedicated to industrial use, as specified, would be an allowable use. The bill would authorize a local agency to impose objective design review standards, except as specified. The bill would authorize a local agency to deny the project if it is proposed to be located on a site or adjoined to any site where any of the square footage on the site is dedicated to industrial use and the local agency makes written findings that approving the development would have an adverse effect on public health and safety. The bill would provide that for purposes of the Housing Accountability Act, a proposed housing development project is consistent, compliant, and in conformity with an applicable plan, program, policy, ordinance, standard, requirement, or other similar provision if the housing development project is consistent with the standards specified in these provisions. The bill would require a local agency to determine whether the proposed development meets those standards within specified timeframes. The bill would define an “extremely affordable adaptive reuse project” for these purposes to mean a multifamily housing development project that involves retrofitting and repurposing of a residential or commercial building that currently allows temporary dwelling or occupancy, and that meets specified affordability requirements, including that 100% of the units be dedicated to lower income households, 50% of which shall be dedicated to very low income households, as specified. Because the bill would require local officials to provide a higher level of service, the bill would impose a state-mandated local program. This bill contains other related provisions and other existing laws.

Position

AB 1532 (Haney D)   Office conversion projects.

Current Text: Introduced: 2/17/2023    html   pdf
Introduced: 2/17/2023
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was H. & C.D. on 3/23/2023)(May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Planning and Zoning Law requires the legislative body of each county and city to adopt a comprehensive, long-term general plan for the physical development of the county or city that includes, among other mandatory elements, a housing element. Under that law, supportive housing, as defined, is a use by right in zones where multifamily and mixed uses are permitted if the developer provides the planning agency with a plan for providing supportive services and the proposed housing development meets specified criteria. This bill would make an office conversion project, as defined, that meets certain requirements a use by right in all areas regardless of zoning. The bill would define “office conversion project” to mean the conversion of a building used for office purposes or a vacant office building into residential dwelling units. The bill would define “use by right” to mean that the city or county’s review of the office conversion may not require a conditional use permit, planned unit development permit, or other discretionary city or county review or approval that would constitute a “project” for purposes of the California Environmental Quality Act, as specified.

Position

AB 1630 (Garcia D)   Planning and zoning: housing development approvals: student housing projects.

Current Text: Amended: 3/21/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 3/21/2023

Page 12 ends

Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was H. & C.D. on 3/9/2023)(May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would enact The Student Housing Crisis Act of 2023. The bill would require a city, county, or city and county to classify student and faculty and staff housing as a permitted use on all real property within 1,000 feet of a university campus, as defined, for zoning purposes. The bill would require a proposed student or faculty and staff housing project, as defined, to be considered ministerially, without discretionary review or a hearing, if specified requirements are met, including that a minimum of 20% of the units in the project be rented by students or faculty and staff of the university. The bill would prohibit a local agency from imposing or enforcing on a student or faculty and staff housing project subject to ministerial consideration certain restrictions, including a minimum automobile parking requirement. The bill would require student or faculty and staff housing to have certain recorded deed restrictions, except as provided, that ensure for at least 55 years that, among other things, at least 20% of the units are affordable to lower income households, as defined, except as provided. In connection with an application submitted pursuant to these provisions, the bill would require a city, county, or city and county to take specified actions, including, upon the request of the applicant, provide a list of permits and fees that are required by the city, county, or city and county. By imposing new duties on local jurisdictions, this bill would impose a state-mandated local program.

Position

AB 1657 (Wicks D)   The Affordable Housing Bond Act of 2024.

Current Text: Amended: 4/17/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 4/17/2023
Status: 9/1/2023-In committee: Held under submission.

Location: 8/14/2023-S. APPR. SUSPENSE FILE
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would enact the Affordable Housing Bond Act of 2024, which, if adopted, would authorize the issuance of bonds in the amount of $10,000,000,000 pursuant to the State General Obligation Bond Law. Proceeds from the sale of these bonds would be used to finance programs to fund affordable rental housing and homeownership programs, including, among others, the Multifamily Housing Program, the CalHome Program, and the Joe Serna, Jr. Farmworker Housing Grant Program.

Position

SB 4 (Wiener D)   Planning and zoning: housing development: higher education institutions and religious institutions.

Current Text: Enrollment: 9/15/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 9/1/2023
Status: 9/15/2023-Enrolled and presented to the Governor at 3 p.m.

Location: 9/15/2023-S. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law, the Zenovich-Moscone-Chacon Housing and Home Finance Act, establishes the California Tax Credit Allocation Committee within the Department of Housing and Community Development. Current law requires the committee to allocate state low-income housing tax credits in conformity with state and federal law that establishes a maximum rent that may be charged to a tenant for a project unit constructed using low-income housing tax credits. The bill would define various terms for these purposes. Among other things, the bill would require that 100% of the units, exclusive of manager units, in a housing development project eligible for approval as a use by right under these provisions be affordable to lower income households, except that 20% of the units may be for moderate-income households, and 5% of the units may be for staff of the independent institution of higher education or the religious institution that owns the land, provided that the units affordable to lower income households are offered at affordable rent, as set in an amount consistent with the rent limits established by the California Tax Credit Allocation Committee, or affordable housing cost, as specified. The bill would authorize the development to include ancillary uses on the ground floor of the development, as specified.

Position

Page 13 ends

SB 7 (Blakespear D)   The Homeless Housing Obligation Act.

Current Text: Amended: 5/1/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 5/1/2023
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was APPR. SUSPENSE FILE on 5/15/2023)(May be acted upon Jan 2024)
Location: 5/19/2023-S. 2 YEAR
Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would, by January 1, 2030, require each city and county to provide housing opportunities, as defined, for homeless individuals within its jurisdiction, based on their most recent point-in-time count. The bill would require each city and county to develop a housing obligation plan that describes how the city or county plans to increase housing opportunities in its jurisdiction so that it can offer at least one housing opportunity to each homeless individual, as specified. In this regard, the bill would require a housing obligation plan to include, among other things, goals and plans to fulfill the city or county’s housing obligation, including specific projects and completion timelines, and the city or county’s progress in reducing the number of homeless individuals in its jurisdiction. The bill would require a housing obligation plan to identify steps taken by the city or county to consult with other jurisdictions to ensure that the plan is consistent with regional homelessness planning efforts. The bill would require a city or county to submit its housing obligation plan to the Department of Housing and Community Development for review and post the plan to its internet website by January 1, 2025. The bill would require a city or county to update its housing obligation plan on or before January 1 of each subsequent year.

Position

SB 91 (Umberg D)   California Environmental Quality Act: supportive and transitional housing: motel conversion: environmental leadership transit projects.

Current Text: Enrollment: 9/20/2023    html   pdf
Introduced: 1/17/2023
Last Amend: 9/8/2023
Status: 9/20/2023-Enrolled and presented to the Governor at 4:30 p.m.

Location: 9/20/2023-S. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The California Environmental Quality Act (CEQA) requires a lead agency, as defined, to prepare, or cause to be prepared, and certify the completion of an environmental impact report (EIR) on a project that it proposes to carry out or approve that may have a significant effect on the environment or to adopt a negative declaration if it finds that the project will not have that effect.

CEQA also requires a lead agency to prepare a mitigated negative declaration for a project that may have a significant effect on the environment if revisions in the project would avoid or mitigate that effect and there is no substantial evidence that the project, as revised, would have a significant effect on the environment. Current law, until January 1, 2025, exempts from CEQA projects related to the conversion of a structure with a certificate of occupancy as a motel, hotel, residential hotel, or hostel to supportive or transitional housing, as defined, that meet certain conditions. This bill would extend indefinitely the above exemption.

Position

SB 326 (Eggman D)   The Behavioral Health Services Act.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/7/2023
Last Amend: 9/8/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/21/2023-S. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: (1)Existing law, the Mental Health Services Act (MHSA), an initiative measure enacted by the voters as Proposition 63 at the November 2, 2004, statewide general election, funds a system of county mental health plans for the provision of mental health services. Existing law authorizes the MHSA to be amended by a 2/3 vote of the Legislature if the amendments are consistent with and further the intent of the MHSA. Existing law authorizes the Legislature to add provisions to clarify procedures and terms of the MHSA by majority vote. This bill would require a county, for behavioral health services eligible for reimbursement pursuant to the federal Social Security Act, to submit the claims for reimbursement to the State Department of Health Care Services (the department) under

Page 14 ends

specific circumstances. The bill would require counties to pursue reimbursement through various channels and would authorize the counties to report issues with managed care plans and insurers to the Department of Managed Health Care or the Department of Insurance. This bill contains other related provisions and other existing laws.

Position

SB 405 (Cortese D)   Planning and zoning: housing element: inventory of sites: regional housing need.

Current Text: Amended: 4/26/2023    html   pdf
Introduced: 2/9/2023
Last Amend: 4/26/2023
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was APPR. SUSPENSE FILE on 5/15/2023)(May be acted upon Jan 2024)
Location: 5/19/2023-S. 2 YEAR
Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Planning and Zoning Law requires each county and each city to adopt a comprehensive, long-term general plan for the physical development of the county or city, and specified land outside its boundaries, that includes specified mandatory elements, including a housing element. Current law also establishes a planning agency in each city and each county with the powers necessary to carry out the Planning and Zoning Law. Current law requires the housing element to include, among other things, an inventory of land suitable and available for residential development.

For a housing element or amendment adopted on or after January 1, 2021, existing law requires the planning agency to submit to the Department of Housing and Community Development an electronic copy of its inventory, as specified. Existing law requires a county or city to submit each revision or amendment of its housing element to the department promptly following adoption of the revision or amendment and requires the department, within 90 days, to review the adopted housing element or amendment and report its findings to the planning agency. This bill would expand the requirement to submit an electronic copy of the above-described inventory to the department to additionally require the planning agency to submit a housing element or amendment prepared on or after January 1, 2021.

Position

SB 423 (Wiener D)   Land use: streamlined housing approvals: multifamily housing developments.

Current Text: Enrollment: 9/15/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 9/1/2023
Status: 9/15/2023-Enrolled and presented to the Governor at 3 p.m.

Location: 9/15/2023-S. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would authorize the Department of General Services to act in the place of a locality or local government, at the discretion of that department, for purposes of the ministerial, streamlined review for development in compliance with the specified-described requirements on property owned by or leased to the state. The bill would extend the operation of the streamlined, ministerial approval process to January 1, 2036. The bill would provide that the streamlined, ministerial approval process does not apply to applications for developments proposed on qualified sites, defined as a site that is located within an equine or equestrian district and meets certain other requirements, that are submitted on or after January 1, 2024, but before July 1, 2025. This bill would modify the specified- described objective planning standards, including by revising the standard that prohibits a multifamily housing development from being subject to the streamlined, ministerial approval process if the development is located in a coastal zone to apply only if the development located in the coastal zone meets any one of specified conditions. The bill would require that a development located in a coastal zone that satisfies the specified conditions obtain a coastal development permit. The bill would require a local government to approve a coastal development permit if it determines that the development is consistent with all objective standards of the local government’s certified local coastal program, as specified. The bill would provide that the changes made by this act would apply in a coastal zone on or after January 1, 2025 This bill would modify the objective planning standard that prohibits a development subject to the streamlined, ministerial approval process from being located in a high fire severity zone by deleting the prohibition for a development to be located within a high or very high fire hazard severity zone as indicated on maps adopted by the Department of Forestry and Fire Protection, and would instead prohibit a development from being located with the state responsibility area, as defined, unless the site has adopted specified standards. The bill would also remove an exception for sites excluded from specified hazard zones by a local agency, as specified.

Position

Page 15 ends

SB 450 (Atkins D)   Housing development: approvals.

Current Text: Amended: 9/1/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 9/1/2023
Status: 9/14/2023-Failed Deadline pursuant to Rule 61(a)(14). (Last location was INACTIVE FILE on 9/14/2023)(May be acted upon Jan 2024)
Location: 9/14/2023-A. 2 YEAR
Desk Policy Fiscal Floor Desk Policy Fiscal 2 year Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law requires a proposed housing development containing no more than 2 residential units within a single-family residential zone to be considered ministerially, without discretionary review or hearing, if the proposed housing development meets certain requirements, including that the proposed housing development does not allow for the demolition of more than 25% of the existing exterior structural walls, except as provided. Current law authorizes a local agency to impose objective zoning standards, objective subdivision standards, and objective design standards, as defined, except as specified, on the proposed housing development. Current law authorizes a local agency to deny a proposed housing development if specified conditions are met, including that the building official makes a written finding that the proposed housing development project would have a specific, adverse impact upon public health and safety or the physical environment, as provided. This bill would remove the requirement that a proposed housing development does not allow for the demolition of more than 25% of the existing exterior structural walls to be considered ministerially. The bill would prohibit a local agency from imposing objective zoning standards, objective subdivision standards, and objective design standards that do not apply uniformly to development within the underlying zone, but would specify that these provisions do not prohibit a local agency from adopting or imposing objective zoning standards, objective subdivision standards, and objective design standards on the development if the standards are more permissive than applicable standards within the underlying zone. The bill would remove the authorization for a local agency to deny a proposed housing development if the building official makes a written finding that the proposed housing development project would have a specific, adverse impact upon the physical environment. The bill would require the local agency to consider and approve or deny the proposed housing development application within 60 days from the date the local agency receives the completed application, and would deem the application approved after that time.

Position

SB 684 (Caballero D)   Land use: streamlined approval processes: development projects of 10 or fewer residential units on urban lots under 5 acres.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/16/2023
Last Amend: 9/7/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/21/2023-S. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Subdivision Map Act vests the authority to regulate and control the design and improvement of subdivisions in the legislative body of a local agency and sets forth procedures governing the local agency’s processing, approval, conditional approval or disapproval, and filing of tentative, final, and parcel maps, and the modification thereof. The Planning and Zoning Law contains various provisions requiring a local government that receives an application for certain types of qualified housing developments to review the application under a streamlined, ministerial approval process depending on the type of housing development, as specified. Current law, known as the Starter Home Revitalization Act of 2021, requires a city or county to approve an application for a small home lot housing development project, as defined, on a proposed site to be subdivided unless the city or county makes a finding related to the development’s compliance with certain requirements or the development’s specific, adverse public health or safety impact. This bill would require a local agency to ministerially consider, without discretionary review or a hearing, a parcel map or a tentative and final map for a housing development project that meets specified requirements. In this regard, the bill would require the proposed subdivision to result in 10 or fewer parcels and the housing development project to, among other things, consist of 10 or fewer residential units, meet certain minimum parcel size and density requirements, and be located on a lot zoned for multifamily residential development that is no larger than 5 acres and is substantially surrounded by qualified urban uses. The bill would exempt the housing development project from certain requirements relating to minimum parcel size and dimensions and the formation of a homeowners’ association, except as specified.

Position

Page 16 ends

SB 742 (Atkins D)   Housing: homelessness programs: report.

Current Text: Introduced: 2/17/2023    html   pdf
Introduced: 2/17/2023
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was HUM. S. on 3/1/2023) (May be acted upon Jan 2024)
Location: 4/28/2023-S. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current establishes various programs to provide rental assistance to help eligible households, including, among others, the state rental assistance program. On or before December 30, 2024, and annually thereafter, this bill would require an agency that funds, implements, or administers a program that provides housing or housing-based services to persons experiencing homelessness or at risk of homelessness, including rental assistance programs, to provide prescribed information to specified committees of the Legislature. This bill would authorize an agency to request a city, county, or city and county to provide specified information to that agency if the city, county, or city and county has received state funds from the agency to fund, implement, or administer the program, as defined.

Position

Human Resources/Public Sector Employment LAP

AB 1484 (Zbur D)   Temporary public employees.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 9/8/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: This bill would impose specified requirements with respect to the temporary employees of a public employer who have been hired to perform the same or similar type of work that is performed by permanent employees represented by a recognized employee organization, subject to limited exceptions. In this regard the bill would require those temporary employees to be automatically included in the same bargaining unit as the permanent employees if the requested classification of temporary employees is not presently within the unit. The bill would further require the public employer to promptly participate in collective bargaining to establish certain employment conditions for the newly added temporary employees if the parties’ current memorandum of understanding does not address them, as specified. The bill would also require a public employer to, upon hire, provide each temporary employee with their job description, wage rates, and eligibility for benefits, anticipated length of employment, and procedures to apply for open, permanent positions. By imposing new duties on local agencies that employ temporary employees, the bill would impose a state-mandated local program.

The bill would require complaints alleging a violation of its provisions to be processed as unfair practice charges under the act. The bill would additionally include the same findings and declarations as set forth above. This bill contains other related provisions and other existing laws.

Position

AB 1637 (Irwin D)   Local government: internet websites and email addresses.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 6/29/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would, no later than January 1, 2029, require a local agency, as defined, that maintains an internet website for use by the public to ensure that the internet website utilizes a “.gov” top-level domain or a “.ca.gov” second-level domain and would require a local agency that maintains an internet website that is noncompliant with that requirement to redirect that internet website to a domain name that does utilize a “.gov” or “.ca.gov” domain. This bill, no later than January 1, 2029, would also require a local agency that maintains public email addresses to ensure that each email address provided to its employees utilizes a “.gov” domain name or a “.ca.gov” domain name. By adding to the duties of local officials, the bill would impose a state-mandated local program.

Page 17 ends

Position
Oppose

SB 329 (Dodd D)   Cities: city council members: compensation.

Current Text: Chaptered: 6/29/2023    html   pdf
Introduced: 2/7/2023
Last Amend: 4/24/2023
Status: 6/29/2023-Approved by the Governor. Chaptered by Secretary of State. Chapter 27, Statutes of 2023.

Location: 6/29/2023-S. CHAPTERED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law authorizes a city council to enact an ordinance to provide each member of the city council a salary based upon the population of the city, as specified. Current law authorizes that amount to be increased by the city council by an amount that does not exceed 5% for each calendar year from the operative date of the last adjustment of the salary that is in effect when the increase is enacted. Current law provides for the procedures by which a city may enact ordinances. This bill would increase the maximum amount of salary, based upon the population of the city, that may be approved by an ordinance passed by the city council, as specified. The bill would authorize the salary of council members to be increased beyond the specified maximums to an amount not exceeding the greater of either 5% for each calendar year from the operative date of the last adjustment of the salary in effect when the ordinance or amendment is enacted, or an amount equal to inflation since January 1, 2024, based upon the California Consumer Price Index, which shall not exceed 10% for each calendar year.

Position

SB 769 (Gonzalez D)   Local government: fiscal and financial training.

Current Text: Amended: 6/22/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 6/22/2023
Status: 9/1/2023-Failed Deadline pursuant to Rule 61(a)(11). (Last location was APPR. SUSPENSE FILE on 7/12/2023)(May be acted upon Jan 2024)
Location: 9/1/2023-A. 2 YEAR
Desk Policy Fiscal Floor Desk Policy 2 year Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require if a local agency provides any type of compensation, salary, or stipend to a member of a legislative body, or provides reimbursement for actual and necessary expenses incurred by a member of a legislative body in the performance of official duties, all local agency officials, as defined, to receive at least 2 hours of fiscal and financial training, as described. The bill would require the training to be received at least once every 2 years, as provided. The bill would exempt a local agency official from the training requirements if they comply with specified criteria under existing law relating to eligibility for appointment or election to, and continuing education for, the office of county auditor, county treasurer, county tax collector, or county treasurer-tax collector.

Position

Public Safety LAP

AB 21 (Gipson D)   Peace officers: training.

Current Text: Introduced: 12/5/2022    html   pdf
Introduced: 12/5/2022
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was APPR. SUSPENSE FILE on 12/5/2022)(May be acted upon Jan 2024)
Location: 5/19/2023-A. 2 YEAR
Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law requires the Commission on Peace Officer Standards and Training (POST) to require field training officers who are instructors for the field training program to have at least 8 hours of crisis intervention behavioral health training to better train new peace officers on how to effectively interact with persons with mental illness or intellectual disability. This bill would require the commission to revise that training to include instruction on how to effectively interact with persons with Alzheimer’s disease or dementia. The bill would specify that a field training officer who completed the training prior to January 1, 2025, or who is exempt from completing the training, is not required to take the updated

Page 18 ends

training, but would require a field training officer who has not completed the training on or after January 1, 2025, or who is not exempt from completing the training, to complete the revised training.

The bill would exempt jurisdictions that, prior to January 1, 2024, develop a training that meets the same requirements.

Position

AB 23 (Muratsuchi D)   Theft: shoplifting: amount.

Current Text: Introduced: 12/5/2022    html   pdf
Introduced: 12/5/2022
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was PUB. S. on 1/26/2023) (May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would amend Proposition 47 by reducing the threshold amount for petty theft and shoplifting from $950 to $400. The bill would provide that it shall become effective only when submitted to, and approved by, the voters of California.

Position

AB 24 (Haney D)   Emergency response: opioid antagonist kits.

Current Text: Amended: 4/26/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 4/26/2023
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was APPR. SUSPENSE FILE on 5/10/2023)(May be acted upon Jan 2024)
Location: 5/19/2023-A. 2 YEAR
Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require the State Department of Public Health to compile a list of all counties that are experiencing an opioid overdose crisis, as defined, and publish the list on its internet website. The bill would also require the department to provide opioid antagonist kits free of charge to as many designated facilities as possible in the counties on the list, to create the opioid antagonist poster with easy-to-understand instructions and graphics on the administration of the attached opioid antagonist nasal spray, and to make the determination on how best to allocate and distribute its limited supply of opioid antagonist among its various programs in the event of an opioid antagonist supply shortage.

Position

AB 28 (Gabriel D)   Firearms and ammunition: excise tax.

Current Text: Chaptered: 9/26/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 9/1/2023
Status: 9/26/2023-Approved by the Governor. Chaptered by Secretary of State - Chapter 231, Statutes of 2023.

Location: 9/26/2023-A. CHAPTERED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Existing law establishes the California Violence Intervention and Prevention (CalVIP) Grant Program, administered by the Board of State and Community Corrections, to award competitive grants for the purpose of violence intervention and prevention. This bill, the Gun Violence Prevention and School Safety Act, would, commencing July 1, 2024, impose an excise tax in the amount of 11% of the gross receipts from the retail sale in this state of a firearm, firearm precursor part, and ammunition, as specified. The tax would be collected by the state pursuant to the Fee Collection Procedures Law. The bill would require that the revenues collected be deposited in the Gun Violence Prevention and School Safety Fund, which the bill would establish in the State Treasury. The bill would require the moneys received in the fund to be used to fund various gun violence prevention, education, research, response, and investigation programs, as specified. The bill would require the Director of Finance to transfer, as a loan, $2,400,000 from the General Fund to the California Department of Tax and Fee Administration to implement these provisions, as specified. The bill would require each licensed firearms dealer, firearms manufacturer, and ammunition vendor to register with the department for a certificate, as specified. The bill would also provide procedures for the issuance, revocation, and reinstatement of a permit.

Page 19 ends

Position
Support

AB 33 (Bains D)   Fentanyl Misuse and Overdose Prevention Task Force.

Current Text: Enrollment: 9/21/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 9/7/2023
Status: 9/21/2023-Enrolled and presented to the Governor at 3:30 p.m.

Location: 9/21/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would, subject to an appropriation, establish the Fentanyl Misuse and Overdose Prevention Task Force to undertake various duties relating to fentanyl misuse, including, among others, collecting and organizing data on the nature and extent of fentanyl misuse in California and evaluating approaches to increase public awareness of fentanyl misuse. The bill would require the task force to be cochaired by the Attorney General and the State Public Health Officer, or their designees, and would specify the membership of the task force.

Position

AB 75 (Hoover R)   Shoplifting: increased penalties for prior crimes.

Current Text: Introduced: 12/14/2022    html   pdf
Introduced: 12/14/2022
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was PUB. S. on 12/14/2022)(May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Safe Neighborhoods and Schools Act, enacted as an initiative statute by Proposition 47, as approved by the electors in the November 4, 2014, statewide general election, makes the theft of property that does not exceed $950 in value petty theft and makes that crime punishable as a misdemeanor, with certain exceptions. The initiative statute defines shoplifting as entering a commercial establishment with the intent to commit larceny while that establishment is open during regular hours, where the value of the property that is taken or intended to be taken does not exceed $950. The initiative statute requires that shoplifting be punished as a misdemeanor. Current law, as amended by Proposition 47, provides that a registered sex offender or a person with a prior conviction for certain serious or violent felonies, such as a sexually violent offense, who commits petty theft is subject to imprisonment in the county jail for up to one year or in the state prison for 16 months or 2 or 3 years. This bill would reinstate a provision of law that was repealed by Proposition 47 that provides that a person who has been convicted 3 or more times of petty theft, grand theft, or other specified crimes and who is subsequently convicted of petty theft is subject to imprisonment in a county jail not exceeding one year or in a county jail for 18 months or 2 or 3 years.

Position

AB 701 (Villapudua D)   Controlled substances: fentanyl.

Current Text: Enrollment: 9/20/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 9/8/2023
Status: 9/20/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/20/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law classifies controlled substances into 5 schedules and places the greatest restrictions and penalties on the use of those substances placed in Schedule I. Current law classifies the drug fentanyl in Schedule II. Existing law prohibits a person from possessing for sale or purchasing for purposes of sale specified controlled substances, including fentanyl, and provides for imprisonment in a county jail for 2, 3, or 4 years for a violation of this provision. Current law also imposes an additional term, and authorizes a trial court to impose a specified fine, upon a person who is convicted of a violation of, or of a conspiracy to violate, specified provisions of law with respect to a substance containing heroin, cocaine base, and cocaine, if the substance exceeds a specified weight. This bill would add fentanyl to the substances for which additional terms or fines can be imposed and would require a defendant who violates those laws with respect to a substance containing heroin, fentanyl, or cocaine, as specified, to know of the substance’s nature or character as a controlled substance to be subjected to an additional term and authorized fine.

Page 20 ends

Position

AB 742 (Jackson D)   Law enforcement: police canines.

Current Text: Amended: 5/18/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 5/18/2023
Status: 6/2/2023-Failed Deadline pursuant to Rule 61(a)(8). (Last location was INACTIVE FILE on 5/31/2023)(May be acted upon Jan 2024)
Location: 6/2/2023-A. 2 YEAR
Desk Policy Fiscal 2 year Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would prohibit the use of an unleashed police canine by law enforcement to apprehend a person unless the person is being pursued for a felony that threatened or resulted in the death of or serious bodily injury to another person and the person poses an imminent danger of death or serious bodily injury to the officer or to another person and any use of a police canine for crowd control. The bill would prohibit a police canine from being used to bite unless there is an imminent threat of death or serious bodily injury to the officer or another person by the person against whom the canine is used. The bill would attribute the death of or serious bodily injury to a person caused by a police canine to the canine‘s handler as constituting deadly force. The bill would prohibit law enforcement agencies from authorizing any use or training of a police canine that is inconsistent with this bill.

Position

AB 797 (Weber D)   Local government: police review boards.

Current Text: Amended: 3/23/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 3/23/2023
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was PUB. S. on 3/23/2023) (May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law requires each department or agency in this state that employs peace officers to establish a procedure to investigate complaints by members of the public against the personnel of these departments or agencies, and to make a written description of this procedure available to the public. Current law also requires each department or agency to keep and maintain records of complaints and investigations, as specified. This bill would require the governing body of each city and county to, by January 15, 2025, create an independent community-based commission on law enforcement officer practices. The bill would authorize each commission to, among other things, conduct independent investigations of complaints against a police officer or sheriff alleging physical injury to a person, including injuries resulting in a person’s death.

Position

AB 955 (Petrie-Norris D)   Controlled substances.

Current Text: Amended: 3/15/2023    html   pdf
Introduced: 2/14/2023
Last Amend: 3/15/2023
Status: 5/1/2023-From committee: That the measure be retained in committee, and that the subject matter be referred to the Committee on Rules for assignment to the proper committee for study. (Ayes

8. Noes 0.) (April 27).

Location: 4/27/2023-A. RLS.

Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law makes possession of specified controlled substances, including fentanyl, punishable by imprisonment in a county jail not to exceed one year, except as specified. Current law makes possession of a controlled substance for the purposes of sale of the substance punishable by imprisonment in a county jail for a period of 2, 3, or 4 years. This bill would make the sale of fentanyl on a social media platform, as defined, in California punishable by imprisonment in a county jail for a period of 3, 6, or 9 years.

Position

Page 21 ends

SB 2 (Portantino D)   Firearms.

Current Text: Chaptered: 9/26/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 9/8/2023
Status: 9/26/2023-Approved by the Governor. Chaptered by Secretary of State. Chapter 249, Statutes of 2023.

Location: 9/26/2023-S. CHAPTERED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law prohibits a person from carrying a concealed firearm or carrying a loaded firearm in public. Current law authorizes a licensing authority, as specified, if good cause exists for the issuance, and subject to certain other criteria including, among other things, the applicant is of good moral character and has completed a specified course of training, to issue a license to carry a concealed handgun or to carry a loaded and exposed handgun, as specified. Under current law, the required course of training for an applicant is no more than 16 hours and covers firearm safety and laws regarding the permissible use of a firearm. This bill would require the licensing authority to issue or renew a license if the applicant is not a disqualified person for the license and the applicant is at least 21 years of age. The bill would remove the good character and good cause requirements from the issuance criteria. Under the bill, the applicant would be a disqualified person if they, among other things, are reasonably likely to be a danger to self, others, or the community at large, as specified. This bill would add the requirement that the applicant be the recorded owner, with the Department of Justice, of the pistol, revolver, or other firearm capable of being concealed upon the person. This bill would change the training requirement to be no less than 16 hours in length and would add additional subjects to the course including, among other things, the safe storage and legal transportation of firearms. The bill would require an issuing authority, prior to that issuance, renewal, or amendment to a license, if it has direct access to the designated department system to determine if the applicant is the recorded owner of the pistol, revolver, or other firearm.

Position

SB 44 (Umberg D)   Controlled substances.

Current Text: Amended: 4/13/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 4/13/2023
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was PUB. S. on 4/13/2023) (May be acted upon Jan 2024)
Location: 4/28/2023-S. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law makes it a crime to possess for sale or purchase for purpose of sale, transport, import, sell, furnish, administer, give away, manufacture, compound, convert, produce, derive, process, or prepare various controlled substances, including, among others, fentanyl, peyote, and various other opiates and narcotics. This bill, Alexandra’s Law, would require the court to advise a person who is convicted of, or who pleads guilty or no contest to, the above crimes, as specified, of the danger of selling or administering illicit drugs and counterfeit pills and that, if a person dies as a result of that action, the defendant can be charged with homicide. The bill would require the court to read the advisory statement in a case in which the defendant exchanged a controlled substance containing fentanyl or its analogs for anything else of value, as specified. The bill would require the advisory statement to be included in a plea form, if used, and specified on the record.

Position

SB 234 (Portantino D)   Opioid antagonists: stadiums, concert venues, and amusement parks.

Current Text: Enrollment: 9/18/2023    html   pdf
Introduced: 1/24/2023
Last Amend: 9/6/2023
Status: 9/18/2023-Enrolled and presented to the Governor at 3 p.m.

Location: 9/18/2023-S. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require each stadium, concert venue, and amusement park to maintain unexpired doses of naloxone hydrochloride or any other opioid antagonist on its premises at all times, and to ensure that at least 2 employees are aware of the location of the naloxone hydrochloride or other opioid antagonist. The bill would exempt from civil or criminal liability a person who, in good faith, administers naloxone hydrochloride or another opioid antagonist by nasal spray or auto-injector on

Page 22 ends

the premises of a stadium, concert venue, or amusement park, other than an act or omission constituting gross negligence or willful or wanton misconduct, except as specified. The bill would exempt from civil or criminal liability a stadium, concert venue, or amusement park, or its employees, or an entity that owns, occupies, or operates a stadium, concert venue, or amusement park, or its employees, for the administration of naloxone hydrochloride or another opioid antagonist, or the failure to administer naloxone hydrochloride or another opioid antagonist, on the premises of the stadium, concert venue, or amusement park, as provided.

Position

SB 316 (Niello R)   Shoplifting: increased penalties for prior crimes.

Current Text: Introduced: 2/6/2023    html   pdf
Introduced: 2/6/2023
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was PUB. S. on 2/15/2023) (May be acted upon Jan 2024)
Location: 5/19/2023-S. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law, as amended by Proposition 47, provides that a registered sex offender or a person with a prior conviction for certain serious or violent felonies, such as a sexually violent offense, who commits petty theft is subject to imprisonment in the county jail for up to one year or in the state prison for 16 months or 2 or 3 years. This bill would reinstate a provision of law that was repealed by Proposition 47 that provides that a person who has been convicted 3 or more times of petty theft, grand theft, or other specified crimes and who is subsequently convicted of petty theft is subject to imprisonment in a county jail not exceeding one year or in a county jail for 18 months or 2 or 3 years.

The bill would also make this provision and the provision relating to a person with serious, violent, or sexual prior offenses applicable to a person whose prior or current conviction is for shoplifting.

Position

SB 719 (Becker D)   Law enforcement agencies: radio communications.

Current Text: Amended: 3/29/2023    html   pdf
Introduced: 2/16/2023
Last Amend: 3/29/2023
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was APPR. SUSPENSE FILE on 4/24/2023)(May be acted upon Jan 2024)
Location: 5/19/2023-S. 2 YEAR
Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law establishes the California Law Enforcement Telecommunications System (CLETS) to make specified criminal justice databases, including individual criminal histories, wanted and missing persons, and stolen firearms, vehicles, and property, available to participating law enforcement agencies. Current law prohibits unauthorized access to CLETS and the unlawful use of CLETS information by authorized users. Current law authorizes the Attorney General to adopt policies, procedures, and practices related to the use of CLETS. These rules require a participating agency to restrict access to CLETS and define “access” as the ability to see or hear any information obtained from CLETS. This bill would require a law enforcement agency, including the Department of the California Highway Patrol, municipal police departments, county sheriff’s departments, specified local law enforcement agencies, and specified university and college police departments, to, by no later than January 1, 2024, ensure public access, in real time, to the radio communications of that agency, as specified.

Position

Regional Issues and Collaboration LAP

AB 11 (Jackson D)   Milton Marks “Little Hoover” Commission on California State Government Organization and Economy.

Current Text: Amended: 3/23/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 3/23/2023
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was APPR. SUSPENSE FILE on 3/29/2023)(May be acted upon Jan 2024)

Page 23 ends

Location: 5/19/2023-A. 2 YEAR
Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law establishes the Milton Marks “Little Hoover” Commission on California State Government Organization and Economy (the commission) for the purpose of securing assistance for the Governor and itself in promoting economy, efficiency, and improved service in the transaction of the public business, as specified, and in making the operation of all state departments, agencies, and instrumentalities, and all expenditures of public funds, more directly responsive to the wishes of the people as expressed by their elected representatives through various means. Existing law declares that the availability of housing is of vital statewide importance. Current law declares that the provision of housing affordable to low- and moderate-income households requires the cooperation of all levels of government. Current law declares that housing prices in California have risen dramatically in all parts of the state in the past decade, while the wealth gap, especially the racial wealth gap, continues to be a growing problem in California. This bill would require the commission to study the causes and effects of the rising cost of living in California and develop solutions toward making California a more affordable place to live, as specified. The bill would require the commission to meet quarterly, as specified. The bill would require the commission to complete 2 reports describing the commission’s findings and recommendations, as specified. The bill would repeal these provisions as of January 1, 2027.

Position

AB 52 (Grayson D)   Income tax credit: sales and use taxes paid: manufacturing equipment: research and development equipment.

Current Text: Amended: 6/15/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 6/15/2023
Status: 9/1/2023-In committee: Held under submission.

Location: 6/26/2023-S. APPR. SUSPENSE FILE
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Bradley-Burns Uniform Local Sales and Use Tax Law, authorizes counties and cities to impose local sales and use taxes in conformity with the Sales and Use Tax Law, and current laws authorize districts, as specified, to impose transactions and use taxes in accordance with the Transactions and Use Tax Law, which generally conforms to the Sales and Use Tax Law. Exemptions from state sales and use taxes are automatically incorporated into the local tax laws. This bill would allow, for a taxable year beginning on or after January 1, 2024, and before January 1, 2029, a credit against those taxes to a taxpayer in an amount equal to the amount of tax reimbursement paid during the taxable year for sales tax on gross receipts that would be exempt from taxation under the Sales and Use Tax Law pursuant to the sales and use tax exemption described above but for the provision that prohibits that exemption from applying with respect to any tax levied by a county, city, or district pursuant to, or in accordance with, the Bradley-Burns Uniform Local Sales and Use Tax Law or the Transactions and Use Tax Law, sales and use taxes imposed pursuant to certain provisions of the Sales and Use Tax Law, and sales and use taxes imposed pursuant to certain provisions of the California Constitution.

Position

AB 1227 (Low D)   Elections: County of Santa Clara.

Current Text: Enrollment: 9/14/2023    html   pdf
Introduced: 2/16/2023
Last Amend: 8/24/2023
Status: 9/14/2023-Enrolled and presented to the Governor at 4:30 p.m.

Location: 9/14/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would authorize the Board of Supervisors of the County of Santa Clara to adopt, and a voter of that county to propose by initiative, an ordinance to elect county officers by ranked choice voting, as specified. The bill would authorize the county, in accordance with such an ordinance, to hold a ranked choice voting election at the statewide primary election at which the election otherwise would be held in accordance with existing law, the first statewide general election following that statewide primary election, or a combination thereof, and to use ranked choice voting in special elections to fill vacancies in county offices, as specified.

Position

Page 24 ends

ACA 1 (Aguiar-Curry D)   Local government financing: affordable housing and public infrastructure: voter approval.

Current Text: Chaptered: 9/20/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 9/5/2023
Status: 9/20/2023-Chaptered by Secretary of State- Chapter 173, Statutes of 2023 Location: 9/20/2023-A. CHAPTERED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The California Constitution prohibits the ad valorem tax rate on real property from exceeding 1% of the full cash value of the property, subject to certain exceptions. This measure would create an additional exception to the 1% limit that would authorize a city, county, city and county, or special district to levy an ad valorem tax to service bonded indebtedness incurred to fund the construction, reconstruction, rehabilitation, or replacement of public infrastructure, affordable housing, including downpayment assistance, or permanent supportive housing, or the acquisition or lease of real property for those purposes, if the proposition proposing that tax is approved by 55% of the voters of the city, county, city and county, or special district, as applicable, and the proposition includes specified accountability requirements. The measure would prohibit a city, county, city and county, or special district from placing a proposition on the ballot pursuant to these provisions if the voters have previously approved a proposition pursuant to these provisions or the below special tax provisions until all funds from the previous proposition are committed to programs and projects listed in the specific local program or ordinance, as described. The measure, subject to certain vote thresholds, would authorize the Legislature to enact laws establishing additional accountability measures and laws for the downpayment assistance programs authorized by the measure, as specified.

Position

ACA 13 (Ward D)   Voting thresholds.

Current Text: Amended: 9/14/2023    html   pdf
Introduced: 7/13/2023
Last Amend: 9/11/2023
Status: 9/14/2023-Read third time. Adopted. (Ayes 28. Noes 9.) Ordered to the Assembly. In Assembly.

Concurrence in Senate amendments pending. Senate amendments concurred in. Held at Desk by unanimous consent until November 1, 2023.

Location: 9/14/2023-A. DESK
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The California Constitution provides that a proposed constitutional amendment and a statewide initiative measure each take effect only if approved by a majority of the votes cast on the amendment or measure. This measure would further provide that an initiative measure that includes one or more provisions that would amend the Constitution to increase the voter approval requirement to adopt any state or local measure would be approved by the voters only if the proportion of votes cast in favor of the initiative measure is equal to or greater than the highest voter approval requirement that the initiative measure would impose. The measure would specify that this voter approval requirement would apply to statewide initiative measures that appear on the ballot on or after January 1, 2024.

Position

Sustainability and Environmental Protection LAP

AB 573 (Garcia D)   Organic waste: meeting recovered organic waste product procurement targets.

Current Text: Amended: 7/13/2023    html   pdf
Introduced: 2/8/2023
Last Amend: 7/13/2023
Status: 9/1/2023-Failed Deadline pursuant to Rule 61(a)(11). (Last location was APPR. SUSPENSE FILE on 8/14/2023)(May be acted upon Jan 2024)
Location: 9/1/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk Policy 2 year Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law requires the State Air Resources Board to approve and begin implementing a comprehensive short-lived climate pollutant strategy to achieve a certain reduction in statewide

Page 25 ends

emissions of methane, including a goal of a 75% reduction in the level of the statewide disposal of organic waste from the 2014 level by 2025. Current law requires the Department of Resources Recycling and Recovery, in consultation with the state board, to adopt regulations to achieve these organic waste reduction goals, that provide for, among other things, the calculation by the department of recovered organic waste product procurement targets for each local jurisdiction, and that may include penalties to be imposed by the department for noncompliance. This bill would require the department, for purposes of those regulations, to allow a local jurisdiction, until December 1, 2031, in procuring recovered organic waste products to meet the target procurement requirements, to use California-derived recovered organic waste that the local jurisdiction sends for processing at a facility or operation outside of the state that meets certain conditions, as provided.

Position

AB 1482 (Gabriel D)   Electric vehicle charging infrastructure: local publicly owned electric utilities.

Current Text: Amended: 5/1/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 5/1/2023
Status: 5/19/2023-Failed Deadline pursuant to Rule 61(a)(5). (Last location was APPR. SUSPENSE FILE on 5/17/2023)(May be acted upon Jan 2024)
Location: 5/19/2023-A. 2 YEAR
Desk Policy 2 year Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law vests the Public Utilities Commission (PUC) with regulatory jurisdiction over public utilities, including electrical corporations, while local publicly owned electric utilities are under the direction of their governing board. Under its current regulatory authority, the PUC adopted a resolution establishing, for electrical corporations, an average service energization time for electric vehicle charging infrastructure of 125 business days, except as provided, and requiring electrical corporations to provide certain information to the PUC regarding service energization time for electric vehicle infrastructure projects. This bill would require each electrical corporation, consistent with the commission resolution, to achieve a 125-business-day average service energization target starting from when a customer submits an application for service to the energization of an electric vehicle charging infrastructure project, except as provided. The bill would establish, for local publicly owned electric utilities, an average service energization time for electric vehicle charging infrastructure of 125 business days, and would require local publicly owned electric utilities to annually report certain information to the State Energy Resources Conservation and Development Commission (Energy Commission) regarding the service energization time for electric vehicle charging infrastructure projects.

Position

AB 1567 (Garcia D)   Safe Drinking Water, Wildfire Prevention, Drought Preparation, Flood Protection, Extreme Heat Mitigation, Clean Energy, and Workforce Development Bond Act of 2024.

Current Text: Amended: 5/26/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 5/26/2023
Status: 6/14/2023-Referred to Coms. on N.R. & W. and GOV. & F.

Location: 6/14/2023-S. N.R. & W.

Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would enact the Safe Drinking Water, Wildfire Prevention, Drought Preparation, Flood Protection, Extreme Heat Mitigation, Clean Energy, and Workforce Development Bond Act of 2024, which, if approved by the voters, would authorize the issuance of bonds in the amount of $15,995,000,000 pursuant to the State General Obligation Bond Law to finance projects for safe drinking water, wildfire prevention, drought preparation, flood protection, extreme heat mitigation, clean energy, and workforce development programs.

Position

ACA 2 (Alanis R)   Public resources: Water and Wildfire Resiliency Act of 2023.

Current Text: Introduced: 12/5/2022    html   pdf
Introduced: 12/5/2022
Status: 4/20/2023-Referred to Coms. on W., P., & W. and NAT. RES.

Location: 4/20/2023-A. W.,P. & W.

Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House

Page 26 ends

Summary: Would establish the Water and Wildfire Resiliency Fund within the State Treasury, and would require the Treasurer to annually transfer an amount equal to 3% of all state revenues that may be appropriated as described from the General Fund to the Water and Wildfire Resiliency Fund. The measure would require the moneys in the fund to be appropriated by the Legislature and would require that 50% of the moneys in the fund be used for water projects, as specified, and that the other 50% of the moneys in the fund be used for forest maintenance and health projects, as specified.

Position

SB 867 (Allen D)   Drought, Flood, and Water Resilience, Wildfire and Forest Resilience, Coastal Resilience, Extreme Heat Mitigation, Biodiversity and Nature-Based Climate Solutions, Climate Smart Agriculture, Park Creation and Outdoor Access, and Clean Energy Bond Act of 2024.

Current Text: Amended: 6/22/2023    html   pdf
Introduced: 2/17/2023
Last Amend: 6/22/2023
Status: 7/6/2023-July 10 hearing postponed by committee.

Location: 6/20/2023-A. NAT. RES.

Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would enact the Drought, Flood, and Water Resilience, Wildfire and Forest Resilience, Coastal Resilience, Extreme Heat Mitigation, Biodiversity and Nature-Based Climate Solutions, Climate Smart Agriculture, Park Creation and Outdoor Access, and Clean Energy Bond Act of 2024, which, if approved by the voters, would authorize the issuance of bonds in the amount of $15,500,000,000 pursuant to the State General Obligation Bond Law to finance projects for drought, flood, and water resilience, wildfire and forest resilience, coastal resilience, extreme heat mitigation, biodiversity and nature-based climate solutions, climate smart agriculture, park creation and outdoor access, and clean energy programs.

Position

Transportation Issues LAP

AB 69 (Waldron R)   Transportation: traffic signal synchronization: roadway improvement projects.

Current Text: Introduced: 12/9/2022    html   pdf
Introduced: 12/9/2022
Status: 4/28/2023-Failed Deadline pursuant to Rule 61(a)(2). (Last location was TRANS. on 2/2/2023) (May be acted upon Jan 2024)
Location: 4/28/2023-A. 2 YEAR
Desk 2 year Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The State Air Resources Board is required to adopt a statewide greenhouse gas emissions limit equivalent to the statewide greenhouse gas emissions level in 1990 to be achieved by 2020 and to ensure that statewide greenhouse gas emissions are reduced to at least 40% below the 1990 level by 2030, and to adopt rules and regulations in an open public process to achieve the maximum, technologically feasible, and cost-effective greenhouse gas emissions reductions. The act authorizes the state board to include the use of market-based compliance mechanisms. Existing law requires all moneys, except for fines and penalties, collected by the state board from the auction or sale of allowances as part of a market-based compliance mechanism to be deposited in the Greenhouse Gas Reduction Fund and to be available upon appropriation. Current law requires the Department of Finance, in consultation with the state board and any other relevant state agency, to develop, as specified, a 3-year investment plan for the moneys deposited in the Greenhouse Gas Reduction Fund.

Current law authorizes moneys in the fund to be allocated, as specified, for an investment in a traffic signal synchronization component that is part of a sustainable infrastructure project if the component is designed and implemented to achieve cost-effective reductions in greenhouse gas emissions and includes specific emissions reduction targets and metrics to evaluate the project’s effect. This bill would additionally authorize moneys in the fund to be allocated for an investment in a traffic signal synchronization component that is part of a roadway improvement project requiring multiple signals, including, but not limited to, multimodal redevelopment projects, rail trail projects, urban renewal projects, or a project near transit facilities, if the component is designed and implemented to achieve cost-effective reductions in greenhouse gas emissions and includes specific emissions reduction targets and metrics to evaluate the project’s effect.

Position

Page 27 ends

AB 295 (Fong, Vince R)   Department of Transportation: maintenance projects.

Current Text: Amended: 5/18/2023    html   pdf
Introduced: 1/25/2023
Last Amend: 5/18/2023
Status: 7/14/2023-Failed Deadline pursuant to Rule 61(a)(10). (Last location was TRANS. on 6/14/2023)(May be acted upon Jan 2024)
Location: 7/14/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk 2 year Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require the Department of Transportation to expedite roadside maintenance for specified projects related to roadside maintenance and the removal and clearing of material, as provided. The bill would also authorize local governmental entities, fire protection districts, fire safe councils, and tribal entities to notify the department of those projects related to roadside maintenance and the removal and clearing of material that have not been completed in an efficient and timely manner if the continued failure to complete these projects poses a clear and imminent danger, as provided. The bill would require the Division of Maintenance to begin the maintenance project within 90 days of being notified.

Position

AB 825 (Bryan D)   Vehicles: bicycles on sidewalks.

Current Text: Enrollment: 9/20/2023    html   pdf
Introduced: 2/13/2023
Last Amend: 9/8/2023
Status: 9/20/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/20/2023-A. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would, until January 1, 2031, and except as specified, prohibit a local authority from prohibiting the operation of a bicycle on a sidewalk adjacent to a highway or corridor that does not include a Class I, Class II, or Class IV bikeway, as defined, and would require the Commissioner of the California Highway Patrol to submit a report to the Legislature regarding the effects of that prohibition.

Position

SB 381 (Min D)   Electric bicycles: study.

Current Text: Enrollment: 9/20/2023    html   pdf
Introduced: 2/9/2023
Last Amend: 6/19/2023
Status: 9/20/2023-Enrolled and presented to the Governor at 4:30 p.m.

Location: 9/20/2023-S. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Would require the Mineta Transportation Institute at San Jose State University, in consultation with relevant stakeholders, to, on or before January 1, 2026, conduct a study on electric bicycles to inform efforts to improve the safety of users of the transportation system, and to submit a report of the findings from the study to the Legislature. The bill would require the study to examine, identify, and analyze available information regarding, among other things, data on injuries, crashes, emergency room visits, and deaths related to bicycles and electric bicycles and best practices for policy to promote safe use of electric bicycles.

Position

Water Supply and Conservation LAP

AB 249 (Holden D)   Water: schoolsites: lead testing.

Current Text: Enrollment: 9/20/2023    html   pdf
Introduced: 1/18/2023
Last Amend: 9/6/2023
Status: 9/20/2023-Enrolled and presented to the Governor at 4 p.m.

Location: 9/20/2023-A. ENROLLED

Page 28 ends

Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Existing law, the California Safe Drinking Water Act, requires the State Water Resources Control Board to administer provisions relating to the regulation of drinking water to protect public health. The act requires the state board to establish a grant program, in consultation with the State Department of Education, to award grants to local educational agencies for the purposes of improving access to, and the quality of, drinking water in public schools serving kindergarten or any of grades 1 to 12, inclusive, and preschools and child daycare facilities located on public school property. This bill would require a community water system that serves a schoolsite, as defined, to test for lead in the potable water system outlets of the schoolsite before January 1, 2027, except as provided. This bill contains other related provisions and other existing laws.

Position

AB 460 (Bauer-Kahan D)   State Water Resources Control Board: water rights and usage: interim relief:
procedures.

Current Text: Amended: 5/18/2023    html   pdf
Introduced: 2/6/2023
Last Amend: 5/18/2023
Status: 7/14/2023-Failed Deadline pursuant to Rule 61(a)(10). (Last location was N.R. & W. on 6/7/2023)(May be acted upon Jan 2024)
Location: 7/14/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk 2 year Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law authorizes the State Water Resources Control Board to investigate all streams, stream systems, lakes, or other bodies of water, take testimony relating to the rights to water or the use of water, and ascertain whether water filed upon or attempted to be appropriated is appropriated under the laws of the state. Current law requires the board to take appropriate actions to prevent waste or the unreasonable use of water. This bill would authorize the board, in conducting specified investigations or proceedings to inspect the property or facilities of a person or entity, as specified. The bill would authorize the board, if consent is denied for an inspection, to obtain an inspection warrant, as specified, or in the event of an emergency affecting public health and safety, to conduct an inspection without consent or a warrant.

Position

AB 939 (Pellerin D)   Santa Clara Valley Water District.

Current Text: Chaptered: 9/8/2023    html   pdf
Introduced: 2/14/2023
Last Amend: 7/6/2023
Status: 9/8/2023-Approved by the Governor. Chaptered by Secretary of State - Chapter 170, Statutes of 2023.

Location: 9/8/2023-A. CHAPTERED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: The Santa Clara Valley Water District Act creates the Santa Clara Valley Water District, and authorizes the district to provide for the conservation and management of flood, storm, and recycled waters, and other waters, for beneficial uses and to enhance natural resources in connection with carrying out the purposes of the district. The act authorizes the district to levy ad valorem taxes or assessments in the district to pay the general administrative costs and expenses of the district, to carry out the act’s objects or purposes, and to pay the costs and expenses of constructing or extending works within the district. The act additionally authorizes the district to levy taxes or assessments upon all property or all real property within a portion of the district for specified purposes. The act authorizes the district to issue bonds for specified purposes, and requires that the bonds be paid by revenue derived from those tax levies and assessments, except the ad valorem taxes or assessments. This bill would additionally authorize the district to use the revenues from the ad valorem taxes or assessments to pay for the bonds.

Position

AB 1337 (Wicks D)   State Water Resources Control Board: water diversion curtailment.

Current Text: Amended: 5/18/2023    html   pdf
Introduced: 2/16/2023
Last Amend: 5/18/2023
Status: 7/14/2023-Failed Deadline pursuant to Rule 61(a)(10). (Last location was N.R. & W. on

Page 29 ends

6/7/2023)(May be acted upon Jan 2024)
Location: 7/14/2023-S. 2 YEAR
Desk Policy Fiscal Floor Desk 2 year Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Under existing law, the diversion or use of water other than as authorized by specified provisions of law is a trespass, subject to specified civil liability. This bill would expand the instances when the diversion or use of water is considered a trespass. This bill contains other related provisions and other existing laws.

Position

SB 3 (Dodd D)   Discontinuation of residential water service: covered water system.

Current Text: Enrollment: 9/15/2023    html   pdf
Introduced: 12/5/2022
Last Amend: 9/1/2023
Status: 9/15/2023-Enrolled and presented to the Governor at 3 p.m.

Location: 9/15/2023-S. ENROLLED
Desk Policy Fiscal Floor Desk Policy Fiscal Floor Conf.

Conc. Enrolled Vetoed Chaptered1st House 2nd House
Summary: Current law establishes the Safe Drinking Water Account to be available to the State Water Resources Control Board, upon appropriation by the Legislature, for the purpose of providing funds necessary to administer the California Safe Drinking Water Act. This bill would expand the use of available funds in the account to be used by the state board, upon appropriation by the Legislature, to include the administration of the Water Shutoff Protection Act.

Position

Total Measures: 81
Total Tracking Forms: 81

Page 30 ends

2023 Q3 Legislative Action Summary

Below is a summary of the actions that were taken during 2023 Q3 as they align with the City of Santa Clara’s 2023 Legislative Advocacy Positions (LAPs), guiding principles for legislative advocacy, approved City policies (e.g. City Council Goals and Priorities), and/or Council action. The summary also includes two letters dated April 11, 2023 that were inadvertently left off the Q2 Legislative Action Summary. The letters and bill analysis are attached to this document.

Council Pillar: Deliver and Enhance High-Quality Efficient Services and Infrastructure
• April 11, 2023 Letter of Support for the City of Santa Clara 2023 State Budget Requests to Assemblymember Evan Low
• April 11, 2023 Letter of Support for the City of Santa Clara 2023 State Budget Requests to State Senator Aisha Wahab

Housing LAP
• September 13, 2023 Support and Request for Signature Letter to Governor Gavin Newsom regarding AB 1469 – Valley Water - Assisting Unsheltered People
• September 13, 2023 Letter of support to Rep. Hakeem Jeffries and Rep. Kevin McCarthy regarding S.1514 and H.R.3170, the Homes for Every Local Protector, Educator, and Responder (HELPER) Act

Public Safety LAP
• September 13, 2023 Support and Request for Signature Letter to Governor Gavin Newsom regarding AB 28 - Funding for Gun Violence Prevention

Multiple Legislative Priorities
• Bill analysis for the September 14, 2023 Cities Association Legislative Action Committee Meeting

1500 Warburton Avenue ● Santa Clara, CA 95050 ● Phone: 408-615-2200 ● Fax: 408-241-6771 ● SantaClaraCA.gov Mayor
Lisa M. Gillmor

Councilmembers
Kathy Watanabe, District 1
Raj Chahal, District 2
Karen Hardy, District 3
Kevin Park, District 4
Suds Jain, District 5
Anthony J. Becker, District 6

April 11, 2023

The Honorable Evan Low
Assemblymember, 26th District
1021 O Street, Suite 8230
Sacramento, CA 95814

Re: 2023 State Budget Requests from the City of Santa Clara

Dear Assemblymember Low:

On behalf of the City of Santa Clara, I want to express my enthusiasm about continuing to build a strong relationship between the City and your office.

As the State Legislature continues to evaluate funding priorities, as part of the FY 2023 -24 Budget process, I am respectfully presenting a list of priority projects that the City would like to partner with you on.

Through discussions with City officials, the City has identified four priority projects that we believe would be worthy recipients of state funding given their significant local and regional impacts. As such, we seek to partner with you to secure funding in the 2023 State Budget. The funding requests have been placed in order of priority.

1. Regional Public Safety Interoperable Radio Communications Amount Requested: $2,500,000
Project Description: The City is a member of a countywide organization dedicated to facilitating interoperable voice and data communications known as Silicon Valley Regional Interoperability Authority (SVRIA). This system operates on a P25 digital radio system that allows public safety entities throughout Santa Clara County interoperability in situations where a multi -jurisdictional response is necessary, such as severe storm, flooding, fires, earthquake, active shooter, mutual aid situations, and domestic terrorism. Critical incidents that have required the use of these radios include the Gilroy Garlic Festival and Valley Transportation Authority shootings. This two -way radio infrastructure is also critical in managing large-scale events at Levi's Stadium as local, state and federal law enforcement is necessary to carry out each major event at this venue.

The City’s Police and Fire Departments respond to the daily needs of the community, and routinely prepare to respond to critical incidents in the City, region, and throughout the state.

In 2022, the Communications Center received 161,398 emergency and non -emergency calls for service. Many of the City’s portable and mobile radios are nearing the end of their serviceable life and are in need of replacement. This request, if funded, would allow the City to secure a significant portion of the radios that need replacing.

City of
Santa Clara
Tho Ccntor of Whan Posslb ..

The Honorable Evan Low
2023 State Budget Requests from the City of Santa Clara March 23, 2023

Page 2 of 3 ends

2. Cupertino-Santa Clara On-Demand Micro-Transit Shuttle Project Amount Requested: $2,500,000
Project Description: The City of Santa Clara is partnering with the City of Cupertino to implement an on-demand micro-transit shuttle project to serve those who live and work in Cupertino and Santa Clara. With support from a California State Transportation Agency State Transit and Intercity Rail Capital Program (TIRCP) grant, the goal is to continue Cupertino’s existing On-Demand Micro-Transit Shuttle program and expand service into Santa Clara with a fleet of zero-emissions vehicles. Service is being designed to focus on offering improved and affordable connections between local Caltrain, Amtrak, VTA stations to job centers and other key destinations in Cupertino and Santa Clara while providing increased transit access for disadvantaged communities, high poverty zones, and senior populations.

3. Great America Parkway Congestion Relief and Multimodal Improvements Project Amount Requested: $2,500,000
Project Description: This project will relieve congestion and improve the City’s multimodal environment by constructing bicycle facilities and travel lane and traffic signal improvements at a major intersection in the North Santa Clara area. The project is located at the intersection of Great America Parkway and Mission College Boulevard and connects the US-101 and State Route 237 freeways to key destinations in the heart of Silicon Valley, including Levi's Stadium (1.1 million visitors in 2019), the Santa Clara Convention Center (318,000 visitors in 2019), Great America Amusement Park (1.5 million visitors in 2019), Mission Communi ty College (serves over 10,000 students), Mercado Shopping Center (over 200,000 square feet of retail), as well as the headquarters of major companies like Intel, Advanced Micro Devices, Applied Materials, Marvell Technology, and Chegg. In addition to serving these destinations, the City is working on Long Range Plans to add over 20,000 housing units, 12 million square feet of office space, and 2 million square feet of retail in the North Santa Clara area that is served by this intersection. This project wi ll improve safety and increase mobility for all users of this major transportation corridor in Santa Clara.

4. SC Overnight Care Locations
Amount Requested: $1,800,000
Project Description: Unprecedented weather events of the past year have amplified the need for the City to address basic needs of people living outside for shelter, health, and hygiene. While the City opens warming/cooling centers in City facilities during normal business hours, there is a need to extend hours to include overnight hours. Modeled after the OWL (Overnight Warming Location) Program in San Jose, this project seeks to establish up to two sites in Santa Clara where the unhoused will have a safe place to gain respite from inclement weather conditions, address immediate needs for food a nd access support services. The City recently drafted a Homelessness Response Plan which has identified this gap in service as a critical need. While the City is piloting a mobile shower and laundry service and works collaboratively with local non -profits to provide support services, there is currently no overnight shelter or emergency interim housing in Santa Clara. Consequently, the basic needs, health, and welfare of unhoused individuals in Santa Clara are going unmet.

This project would fund the initial investment to launch pop -up emergency overnight facilities, fund a dedicated street and encampment outreach team and staff overnight care locations for a two -year period. Funding would also be used to explore partnerships with The Honorable Evan Low
2023 State Budget Requests from the City of Santa Clara March 23, 2023

Page 3 of 3 ends

Valley Water, the County, Ca ltrans, railroads, businesses, nonprofits, faith -based and volunteer organizations to leverage funding, facilities, expertise and staffing to manage the impacts of encampments and support clean -up activities near encampments, parks, creeks and other locati ons in the City in an effort to create a more comprehensive homelessness response.

I am optimistic that these project requests align with state goals and would be a worthy investment of state funds. Thank you for your consideration.

Sincerely,

Lisa M. Gillmor
Mayor
City of Santa Clara

1500 Warburton Avenue ● Santa Clara, CA 95050 ● Phone: 408-615-2200 ● Fax: 408-241-6771 ● SantaClaraCA.gov Mayor
Lisa M. Gillmor

Councilmembers
Kathy Watanabe, District 1
Raj Chahal, District 2
Karen Hardy, District 3
Kevin Park, District 4
Suds Jain, District 5
Anthony J. Becker, District 6

April 11, 2023

The Honorable Aisha Wahab
State Senator, 10th District
1021 O Street, Suite 6530
Sacramento, CA 95814

Re: 2023 State Budget Requests from the City of Santa Clara

Dear Senator Wahab:

On behalf of the City of Santa Clara, I want to express my enthusiasm about continuing to build a strong relationship between the City and your office.

As the State Legislature continues to evaluate funding priorities, as part of the FY 2023-24 Budget process, I am respectfully presenting a list of priority projects that the City would like to partner with you on.

Through discussions with City officials, the City has identified four priority projects that we believe would be worthy recipients of state funding given their significant local and regional impacts. As such, we seek to partner with you to secure funding in the 2023 State Budget. The funding requests have been placed in order of priority.

1. Regional Public Safety Interoperable Radio Communications Amount Requested: $2,500,000
Project Description: The City is a member of a countywide organization dedicated to facilitating interoperable voice and data communications known as Silicon Valley Regional Interoperability Authority (SVRIA). This system opera tes on a P25 digital radio system that allows public safety entities throughout Santa Clara County interoperability in situations where a multi -jurisdictional response is necessary, such as severe storm, flooding, fires, earthquake, active shooter, mutual aid situations, and domestic terrorism. Critical incidents that have required the use of these radios include the Gilroy Garlic Festival and Valley Transportation Authority shootings. This two -way radio infrastructure is also critical in managing large-scale events at Levi's Stadium as local, state and federal law enforcement is necessary to carry out each major event at this venue.

The City’s Police and Fire Departments respond to the daily needs of the community, and routinely prepare to respond to critical incidents in the City, region, and throughout the state.

In 2022, the Communications Center received 161,398 emergency and non -emergency calls for service. Many of the City’s portable and mobile radios are nearing the end of their serviceable life and are in need of replacement. This request, if funded, would allow the City to secure a significant portion of the radios that need replacing.

City of
Santa Clara
Tho Ccntor of Whan Posslb ..

The Honorable Aisha Wahab
2023 State Budget Requests from the City of Santa Clara April 11, 2023

Page 2 of 3 ends

2. Cupertino-Santa Clara On-Demand Micro-Transit Shuttle Project Amount Requested: $2,500,000
Project Description: The City of Santa Clara is partnering with the City of Cupertino to implement an on-demand micro-transit shuttle project to serve those who live and work in Cupertino and Santa Clara. With support from a California State Transportation Agency State Transit and Intercity Rail Capital Program (TIRCP) grant, the goal is to continue Cupertino’s existing On-Demand Micro-Transit Shuttle program and expand service into Santa Clara with a fleet of zero-emissions vehicles. Service is being designed to focus on offering improved and affordable connections between local Caltrain, Amtrak, VTA stations to job centers and other key destinations in Cupertino and Santa Clara while providing increased transit access for disadvantaged communities, high poverty zones, and senior populations.

3. Great America Parkway Congestion Relief and Multimodal Improvements Project Amount Requested: $2,500,000
Project Description: This project will relieve congestion and improve the City’s multimodal environment by constructing bicycle facilities and travel lane and traffic signal improvements at a major intersection in the North Santa Clara area. The project is located at the intersection of Great America Parkway and Mission College Boulevard and connects the US-101 and State Route 237 freeways to key destinations in the heart of Silicon Valley, including Levi's Stadium (1.1 million visitors in 2019), the Santa Clara Convention Center (318,000 visitors in 2019), Great America Amusement Park (1.5 million visitors in 2019), Mission Community Col lege (serves over 10,000 students), Mercado Shopping Center (over 200,000 square feet of retail), as well as the headquarters of major companies like Intel, Advanced Micro Devices, Applied Materials, Marvell Technology, and Chegg. In addition to serving th ese destinations, the City is working on Long Range Plans to add over 20,000 housing units, 12 million square feet of office space, and 2 million square feet of retail in the North Santa Clara area that is served by this intersection. This project will imp rove safety and increase mobility for all users of this major transportation corridor in Santa Clara.

4. SC Overnight Care Locations
Amount Requested: $1,800,000
Project Description: Unprecedented weather events of the past year have amplified the need for the City to address basic needs of people living outside for shelter, health , and hygiene. While the City opens warming/cooling centers in City facilities during normal business hours, there is a need to extend hours to include overnight hours. Modeled after the OWL (Overnight Warming Location) Program in San Jose, this project seeks to establish up to two sites in Santa Clara where the unhoused will have a safe place to gain respite from inclement weather conditions, address immediate needs for food an d access support services. The City recently drafted a Homelessness Response Plan which has identified this gap in service as a critical need. While the City is piloting a mobile shower and laundry service and works collaboratively with local non -profits t o provide support services, there is currently no overnight shelter or emergency interim housing in Santa Clara. Consequently, the basic needs, health, and welfare of unhoused individuals in Santa Clara are going unmet.

This project would fund the initial investment to launch pop -up emergency overnight facilities, fund a dedicated street and encampment outreach team and staff overnight care locations for a two -year period. Funding would also be used to explore partnerships with The Honorable Aisha Wahab
2023 State Budget Requests from the City of Santa Clara April 11, 2023

Page 3 of 3 ends

Valley Water, the County, Cal trans, railroads, businesses, nonprofits, faith -based and volunteer organizations to leverage funding, facilities, expertise and staffing to manage the impacts of encampments and support clean -up activities near encampments, parks, creeks and other locatio ns in the City in an effort to create a more comprehensive homelessness response.

I am optimistic that these project requests align with state goals and would be a worthy investment of state funds. Thank you for your consideration.

Sincerely,

Lisa M. Gillmor
Mayor
City of Santa Clara

1500 Warburton Avenue ● Santa Clara, CA 95050 ● Phone: 408-615-2200 ● Fax: 408-241-6771 ● SantaClaraCA.gov Mayor
Lisa M. Gillmor

September 13, 2023

The Honorable Gavin Newsom
Governor, State of California
1021 O Street, Suite 9000
Sacramento, CA 95814

Subject: AB 1469 (Kalra) Valley Water – Assisting Unsheltered People Re: Request for Signature

Dear Governor Newsom:

On behalf of the City of Santa Clara City Council and in alignment with the City’s Legislative Advocacy Position Policy, I am writing to respectfully request your signature on AB 1469, w hich makes changes to the Santa Clara Valley Water District Act to allow the agency to do more to assist unsheltered people living along creeks and streams, including providing housing or improved outcomes for unsheltered individuals.

Santa Clara County is currently experiencing unprecedented increases in the number of unhoused people taking refuge along waterways that run through neighborhoods, parks, and open spaces, as well as through commercial districts and industrial areas. As the regional ag ency responsible for water supply, flood protection, and the environmental stewardship of creeks and streams, the Santa Clara Valley Water District (Valley Water) owns hundreds of miles of property along waterways as well as other public lands. These locat ions are a preferred refuge for unsheltered people because of their proximity to surface water and the sheltering effects of riparian vegetation, canyons, and creek banks. Valley Water estimated in February 2023 that more than 2,000 unsheltered people were taking refuge on the agency’s properties and easements.

AB 1469 (Kalra) would provide Valley Water with the statutory authorization to use its land and a portion of its general tax revenue to humanely assist unsheltered people living along waterways to p rovide outreach, interim housing, or other supportive services through contracts with cities, the County, or non - governmental organizations. The agency’s goal is to bring more resources to the table to facilitate solutions to serious environmental and oper ational impacts of large numbers of unsheltered people living along creeks and streams.

The Honorable Gavin Newsom
Re: AB 1469 (Kalra) Valley Water – Assisting Unsheltered People September 13, 2023

Page 2 of 2 ends

The City of Santa Clara urges you to sign AB 1469 because it will enable Valley Water to do more to assist unsheltered people taking refuge along waterways, provide more resources to support the efforts of cities, the County, and non - governmental organizations to address the homelessness crisis in our region, and will give Valley Water the tools it needs to improve water quality and protect sensitive, threatened, and endangered species.

Sincerely,
L
isa M. Gillmor
Mayor
City of Santa Clara
C
ontact:

Tel: (408) 615-2250
Fax: (408) 241-6771
Email: [email protected]

1500 Warburton Avenue ● Santa Clara, CA 95050 ● Phone: 408-615-2200 ● Fax: 408-241-6771 ● SantaClaraCA.gov Mayor
Lisa M. Gillmor
Councilmembers
Kathy Watanabe, District 1
Raj Chahal, District 2
Karen Hardy, District 3
Kevin Park, District 4
Suds Jain, District 5
Anthony J. Becker, District 6
The H
onorable Chuck Schumer
Majority Leader
United States Senate
Washington, D.C. 20510
The H
onorable Mitch McConnell
Republican Leader
United States Senate
September 13, 2023
The Honorable Kevin McCarthy
Speaker of the House
United States House of Representatives
Washington, D.C. 20515
The Honorable Hakeem Jeffries
Democratic Leader
United States House of Representatives
Washington, D.C. 20515 Washington, D.C. 20510
RE: S u
pport of S.1514 and H.R.3170, the Homes for Every Local Protector, Educator, and Responder (HELPER) Act
Dear Sp
eaker McCarthy, Majority Leader Schumer, Leader Jeffries, and Leader McConnell:

On beha
lf of the City of Santa Clara, I am honored to write in strong support of S.1514 and H.R.3170, the Homes for Every Local Protector, Educator, and Responder (HELPER) Act, introduced by U.S. Senators Marco Rubio (R -FL), John Ossoff (D- GA), Sherrod Brown (D-OH), Raphael Warnock (D-GA), Robert Menendez (D-NJ), Catherine Cortez Masto (D- NV), and Richard Blumenthal (D-CT) and U.S.

Representatives John Rutherford (R-FL) and Bonnie Watson Coleman (D-NJ).

The HE
LPER Act would create a home loan program within the Federal Housing Administration to help our law enforcement officers, firefighters, EMTs, paramedics, and preK-12 teachers (“first responders”) by making homeownership more affordable. Too often, our civil servants struggle to afford their first home.

Because of this, we are writing in support of the HELPER Act, which would help our civil servants access the housing they need to serve their communities.

Fir
st responders dedicate their lives to protecting and serving their fellow Americans. The COVID-19 pandemic has only made clearer the ongoing challenges that these brave first responders face. It is time we honor them for their service. To that end, the HELPER Act program will function similarly to the home loan program managed by the Department of Veterans Affairs. Managed by the Federal Housing Administration, it will allow law enforcement officers, fire fighters, EMTs, paramedics, and preK-12 teachers to obtain a low-interest, fully insured home loan with no down payment and no monthly mortgage insurance costs for a first-time home purchase.

Support of S.1514 and H.R.3170, the Homes for Every Local Protector, Educator, and Responder (HELPER) Act September 13, 2023

Page 2 of 2 ends

Our nation’s first responders have demonstrated their unwavering commitment to their communities. Even amidst a deadly pandemic, these heroes have served without hesitation. We believe they have earned access to affordable housing so that they can provide fo r their families and continue to serv e their communities.

We hope you will join the City of Santa Clara in support of the HELPER Act, and we lo ok forward to working with you on this important matter.

Sincerely,
Li
sa M. Gillmor
Mayor
City of Santa Clara
1500 Warburton Avenue ● Santa Clara, CA 95050 ● Phone: 408-615-2200 ● Fax: 408-241-6771 ● SantaClaraCA.gov ● Lisa M. Gillmor
Mayor
September 13, 2023
T
he Honorable Gavin Newsom
Governor, State of California
1021 O Street, Suite 9000
Sacramento, CA 95814
Re: Assembly Bill (AB) 28 (Gabriel)
- Request for Signature
D
ear Governor Newsom,
O
n behalf of the City of Santa Clara City Council and in alignment with the City’s Legislative Advocacy Position Policy, I am writing to respectfully request your signature on AB 28. This bill will secure dedicated and sustained funding for lifesaving violence intervention initiatives and related gun violence prevention, education, and research purposes through a modest surtax on firearm industry profits.

G
un violence is a public health, safety, and equity crisis. Since the start of the pandemic, our nation has seen record- setting gun and ammunition sales, alongside record nationwide increases in shootings, homicides, and related traumas. This has been a time of record profits for some and brutal pain and loss for too many others.

T
o promote community safety, California has in recent years acted to invest in violence intervention initiatives that work to interrupt entrenched cycles of shootings, trauma, an d retaliation. These programs support and heal victims of firearm violence, and provide targeted intervention services to other individuals identified as highest risk of being shot or involved in cycles of violence in the near future. The state’s investment in these programs, primarily through the California Violence Intervention and Prevention (CalVIP) grant program, has provided a critical lifeline to temporarily sustain and expand programs employing frontline violence intervention workers and saving lives today.

H
owever, these investments have thus far relied on short -term General Fund commitments. Sustained reductions in gun violence will require sustained investments in prevention and intervention efforts and longer -term planning to The Honorable Gavin Newsom
Re: Assembly Bill (AB) 28 (Gabriel) - Request for Signature September 13, 2023

Page 2 of 2 ends

entrench virtuous cycles of trauma recovery, retaliation prevention, peace- building, and safety. The City recognizes the importance of comprehensive efforts to reduce gun violence and supports legislation that preserves, or expands, funding levels for public safety programs and services such as CalVIP that AB 81 would raise funding for.

For these reasons, the City of Santa Clara urges you to sign AB 28.

Sincerely,
L
isa M. Gillmor
Mayor
City of Santa Clara
C
ontact:

Tel: (408) 615-2250
Fax: (408) 241-6771
Email: [email protected]

September 14, 2023 Cities Association
Legislative Action Committee – Bill Analysis
Bill Number Summary Recommended
Position
LAP
AB 573 (Garcia) Authorizes local jurisdictions to procure California-derived organic waste
products that are processed at out-of-
state facilities in order to comply with
the state’s recovered organic waste
procurement requirements.

Support

Position not
necessary at this
time, as the bill was
held on Sen Approps
Suspense File
Sustainability and Environmental
Protection LAP – Support efforts to
streamline permitting and construction
of compost and other facilities
that enable jurisdictions to comply with
SB 1383 and efforts to broaden
procurement requirements for local
jurisdiction to comply with SB 1383.

AB 645 (Gipson) Authorizes an automated camera speed
enforcement pilot program in the cities
of Los Angeles, Long Beach, San
Francisco, Oakland, Glendale and San
Jose.

Support*

*The provisions of
the bill would not
impact Santa Clara
Public Safety LAP – Support efforts to
test speed enforcement cameras and
corresponding legislation to
mitigate traffic-related injuries and
deaths.

AB 742 (Jackson) Prohibits the use of canines by peace
officers for arrest and apprehension
unless necessary to defend against an
imminent threat of death or serious
bodily injury, but permits their use for
search and rescue, explosives
detection, and narcotics detection.

Oppose

Bill was held on
Assembly Inactive
File.

Public Safety LAP - Support initiatives
that maintain existing tools/resources
available to officers to respond to
calls for service, enhance investigation
resources, and aide in crime fighting
while increasing officer and public
safety
AB 971 (Lee) Clarifies that a local authority may
permit other vehicles in transit-only
traffic lanes.

Support Transportation Issues LAP – Support
legislative, regulatory, funding, and
regional efforts to reduce the amount of
traffic congestion on area freeways and
County expressways and reduce
vehicle miles traveled.

September 14, 2023 Cities Association
Legislative Action Committee – Bill Analysis
Bill Number Summary Recommended
Position
LAP
AB 1373 (Garcia) Makes numerous changes to electricity
policy, most notably, authorizes the
Department of Water Resources to
serve as a central procurement entity to
procure energy resources in order to
help the state meet its renewable and
zero-carbon energy resources and
reliability goals.

No Action Energy Legislation, Regulations and
Issues LAP – Monitor and participate
with federal, state and local
governments and stakeholders in the
development of new regulations and
advocate for changes that enhance
system reliability and mitigate
operational and ratepayer impacts.

AB 1379 (Papan) Revises the teleconferencing
procedures of the Brown Act by
removing the 2026 sunset established
in AB 2449, as well as revising several
of the procedural elements of the
remote meeting process.

No Action

Position not
necessary at this
time, as the bill was
held in the Assembly
Local Government
Committee.

Topic not covered in City LAPs
AB 1420 (Berman) Expands the authority of the
Department of Justice (DOJ) to conduct
firearm dealer inspections to ensure
compliance with all applicable state
laws, and requires DOJ to maintain
information on the number of firearms
dealers found to have violated state
laws with knowledge or gross
negligence.

Support Public Safety LAP – Support legislation
that seeks to impose stricter gun
violence laws and/or requires the safe
storage of unattended firearms,
including background checks and
training requirements for gun sales.

September 14, 2023 Cities Association
Legislative Action Committee – Bill Analysis
Bill Number Summary Recommended
Position
LAP
AB 1484 (Zbur) Requires local public employers to
include temporary employees in the
same bargaining unit as permanent
employees.

Oppose Human Resources LAP – Supports
efforts to preserve local government’s
ability to manage its own employment
issues, including, but not limited to,
hiring, evaluating, disciplining, and
negotiating collective bargaining
agreements.

AB 1598 (Berman) Requires the Department of Justice to
prepare a firearm safety certificate
(FSC) study guide explaining
information covered on the FSC test, to
develop a new pamphlet on the risks
and reasons for owning a firearm, and
to update the FSC test.

Support Public Safety LAP – Support legislation
that seeks to impose stricter gun
violence laws and/or requires the safe
storage of unattended firearms,
including background checks and
training requirements for gun sales.

AB 1708
(Muratsuchi)
Amends provisions of Proposition 47
related to shoplifting and petty theft.

Support

Position not
necessary at this
time, as the bill failed
passage in the
Assembly Public
Safety Committee.

Public Safety LAP – Support efforts to
reduce the list of who can seek early
parole and re-classify some theft crimes
from misdemeanors to felonies by
reforming Assembly Bill 109 (approved
by the Legislature in 2011), Proposition
47 (approved by voters in 2014) and
Proposition 57 (approved by voters in
2016).

September 14, 2023 Cities Association
Legislative Action Committee – Bill Analysis
Bill Number Summary Recommended
Position
LAP
AB 2908 (Low) Prohibit a company that provides a
navigation application from directing
traffic within a one-mile radius of an
area identified by the Director of
Forestry and Fire Protection as a very
high fire hazard severity zone. The bill
would require that company to include a
notification on the application that warns
drivers using the application that a
specified emergency event is occurring
in the area described above.

No Action

This legislation was
introduced in 2020
and was
unsuccessful in the
Legislature (never
heard in a policy
committee)
Topic not covered in City LAPs
SB 10 (Cortese) Requires school safety plans of
schools, including charter schools,
serving students in grades seven to 12
to include a protocol for responding to a
student's opioid overdose; requires the
California Department of Education to
post informational materials on its
website on opioid overdose prevention;
and encourages county offices of
education to establish working groups
on fentanyl education in schools.

No Action Topic not covered in City LAPs

September 14, 2023 Cities Association
Legislative Action Committee – Bill Analysis
Bill Number Summary Recommended
Position
LAP
SB 225 (Caballero) Establishes the Community Anti-
Displacement and Preservation
Program (CAPP) at the Department of
Housing and Community Development
(HCD) to fund the acquisition and
rehabilitation of unrestricted housing
units and attach long-term affordability
restrictions on the housing units, while
safeguarding against the displacement
of current residents.

Watch

Position not
necessary at this
time, as the bill was
held in the Asm
Approps Committee
Topic not covered in City LAPs
SB 423 (Weiner) Extends the sunset on SB 35 (Weiner,
Chapter 366, Statutes of 2017) to
January 1, 2036, and makes other
changes related to projects in coastal
zones and high fire hazard severity
zones.

Oppose Housing LAP – Oppose measures that
reduce local control over land use and
planning decisions and are punitive in
nature towards local government.

SB 634 (Becker) Requires an “opportunity housing
project” to be a use by-right in areas
zoned for mixed use, and nonresidential
zones permitting multifamily uses,
medical use, or faith-based use, if the
project meets certain requirements. The
bill would also require the Department
of Housing and Community
Development to investigate possible
changes to the California Building Code
for health, safety, and fire standards
that could unnecessarily increase
project construction costs for
Oppose

Position not
necessary at this
time, as the bill was
held on Sen Approps
Suspense File

Housing LAP – Oppose measures that
reduce local control over land use and
planning decisions and are punitive in
nature towards local government.

September 14, 2023 Cities Association
Legislative Action Committee – Bill Analysis
Bill Number Summary Recommended
Position
LAP
opportunity housing projects, while
ensuring housing quality.

City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-1162 Agenda Date: 10/24/2023

REPORT TO COUNCIL

SUBJECT
Action on the Annual City of Santa Clara Electric Department dba Silicon Valley Power 2023 Wildfire Mitigation Plan

COUNCIL PILLAR
Deliver and Enhance High-Quality Efficient Services and Infrastructure

BACKGROUND
On October 9, 2018, the City Council took action on the initial determination of wildfire risk on the remote transmission assets for the City of Santa Clara associated with Silicon Valley Power (SVP).

This action included direction to SVP staff to create a formal wildfire mitigation plan (WMP) for remote transmission assets owned by SVP required by California Public Utilities Code Section 8387, as amended by Senate Bill 901 in 2018. On June 25, 2019, the City Council approved SVP’s 2019 Wildfire Mitigation Plan. In accordance with State law, the WMP is reviewed by staff and adopted by Council on an annual basis.

SVP’s service territory is contiguous with the City of Santa Clara (City) city limits with limited service in neighboring jurisdictions and is situated in an urban environment. Based on historical fire data and local conditions, and in consultation with local fire departments, there is no significant risk of catastrophic wildfire resulting from overhead electrical lines and equipment within SVP’s service territory. Therefore, the WMP focuses on the management of five transmission assets outside of SVP’s service territory.

The City owns generation facilities and related transmission assets outside of SVP’s service territory.

These include the following:
· The Grizzly Hydroelectric Project (Grizzly), a part of the Bucks Creek Project, FERC No. 619, located in Plumas County, California. To allow for the delivery of energy from Grizzly and interconnection to Pacific Gas & Electric’s transmission system, the City owns approximately

3.4 miles of a 115 kV generation tie line and other appurtenant facilities necessary. Pacific Gas & Electric (PG&E) maintains the generation tie line. The generation tie line is in PG&E’s Wildfire Mitigation Plan.
· The Black Butte Hydroelectric Project (Black Butte), FERC No. 3190 dated May 5, 1983, and amended June 5, 1987. Through this project, the City owns a 9.5 mile long 60 kV generation tie line interconnecting the Black Butte to PG&E’s existing 60 kV line near the city of Orland, California. SVP maintains the generation tie line.
· The Stoney Gorge Hydroelectric Project (Stoney Gorge), FERC No. 3193 dated July 15, 1983.

City of Santa Clara Printed on 10/20/2023Page 1 of 3
powered by Legistar™
23-1162 Agenda Date: 10/24/2023
Through this project, the City owns a one mile-long, 60 kV generation tie line connecting the Stoney Gorge with PG&E’s Elk Creek Substation north of the powerhouse. SVP maintains the generation tie line.
· The High Line Canal Hydroelectric Project (High Line), FERC No. 7252 dated July 17, 1984.

Through this project, the City owns an approximately 75 foot long 12 kV three phase generation tie line that interconnects with existing PG&E lines. SVP maintains the generation tie line.
· A 4.98 percent ownership interest in a 230 kV double circuit transmission line between Castle Rock Junction and Lakeville Substation in area known as the Geysers pursuant to an Agreement of Co-tenancy in the Castle Rock Junction-Lakeville 230 kV Transmission Line, dated June 1, 1984. This line allows for the transmission of the City’s share of energy from the Geothermal Generation Project. PG&E maintains the transmission line.

SVP used the 2018 California Public Utilities Commission (CPUC) Fire Threat Map (WMP Appendix A) and historical fire map data to determine the level of wildfire risk. The CPUC fire threat map has two tiers. Tier 2 fire-threat areas are areas where there is an elevated risk (including likelihood and potential impact on people and property) from utility associated wildfires. Tier 3 fire-threat areas are areas where there is an extreme risk (including likelihood and potential impact on people and property) from utility associated wildfires. Properties that are owned by the City but don’t have any generation, transmission, or distribution such as the Loyalton property are not part of the WMP.

DISCUSSION
Each year, SVP staff reviews the plans to see if there are conditions that warrant changes to the plan.

After the plan is reviewed, staff submits the plan for the City Council to approve. In connection with its approval of the WMP, staff reviewed the WMP to ensure its compliance with statutory requirements.

Once the plan is approved by the City Council, the plan is then submitted to the California Wildfire Safety Advisory Board who is charged with reviewing wildfire mitigation plans and providing suggestions.

The following is a summary of significant changes that were made in the SVP 2023 Wildfire Mitigation Plan:

1. Moved the “Context Setting Information” and the “PUC 8387(b)(2) Requirements Table” to the front of the WMP in accordance with the Wildfire Safety Advisory Board 2022 Guidance Opinion.

2. Replaced the word “de-energization” with “isolation” throughout the document to reflect the state of the line. “De-energization”, per Occupational Safety and Health Administration Standard Number 1910.269(m), states that a line is not de-energized until it is tested as de- energized. Although operators open the lines so that no electricity flows through because there is no testing, SVP considers the line isolated rather than de-energized.

ENVIRONMENTAL REVIEW
City of Santa Clara Printed on 10/20/2023Page 2 of 3
powered by Legistar™
23-1162 Agenda Date: 10/24/2023
The action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to section 15378(b)(2) of Title 14 of the California Code of Regulations as a continuing administrative activity (general policy and procedure making).

FISCAL IMPACT
The creation of an SVP Wildfire Mitigation Plan consolidates and formalizes established SVP preventive maintenance procedures and practices. Related expenses have been included in the Generation and Transmission and Distribution program operating budgets within the Utility Operations Division in the Electric Utility Fund.

COORDINATION
This report has been coordinated with the Finance Department and City Attorney’s Office.

PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.

RECOMMENDATION
Approve and adopt the Silicon Valley Power 2023 Wildfire Mitigation Plan with any comments and confirm that this plan complies with all applicable rules, regulations, and standards.

Reviewed by: Manuel Pineda, Chief Electric Utility Officer Approved by: Jōvan D. Grogan, City Manager

ATTACHMENTS

1. Proposed Silicon Valley Power 2023 Wildfire Mitigation Plan City of Santa Clara Printed on 10/20/2023Page 3 of 3
powered by Legistar™

SILICON VALLEY POWER

WILDFIRE

MITIGATION
PLAN

JUNE 2023

TABLE OF CONTENTS
I. CONTEXT SETTING INFORMATION ............................................................................................. 4 II. PUC 8387(B) REQUIREMENTS TABLE .......................................................................................... 6 III. OVERVIEW ........................................................................................................................................ 7 A. POLICY STATEMENT ......................................................................................................................... 7 B. PURPOSE OF THE WILDFIRE MITIGATION PLAN .............................................................................. 7 C. ORGANIZATION OF THE WILDFIRE MITIGATION PLAN ................................................................... 9 IV. OBJECTIVES OF THE WILDFIRE MITIGATION PLAN ................................................................ 9 A. MINIMIZING SOURCES OF IGNITION ............................................................................................... 9 B. RESILIENCY OF THE ELECTRIC GRID ............................................................................................... 9 C. IDENTIFYING UNNECESSARY OR INEFFECTIVE ACTIONS ................................................................. 9 V. ROLES AND RESPONSIBILITIES ................................................................................................... 10 A. UTILITY GOVERNANCE STRUCTURE ............................................................................................... 10 B. WILDFIRE PREVENTION ................................................................................................................. 10 C. WILDFIRE RESPONSE AND RECOVERY .......................................................................................... 11 VI. WILDFIRE RISKS AND DRIVERS ASSOCIATED WITH DESIGN, CONSTRUCTION, OPERATION, AND MAINTENANCE ..................................................................................................... 12 A. PARTICULAR RISKS AND RISK DRIVERS ASSOCIATED WITH TOPOGRAPHIC AND CLIMATOLOGICAL RISK FACTORS .......................................................................................................... 12 B. IDENTIFYING AND PRESENTING ENTERPRISE WIDE SAFETY RISK ................................................... 13 C. CHANGES TO CPUC FIRE THREAT MAP ..................................................................................... 13 VII. WILDFIRE PREVENTATIVE STRATEGIES ..................................................................................... 14 A. HIGH FIRE THREAT DISTRICT ......................................................................................................... 14 B. WEATHER MONITORING ............................................................................................................... 14 C. DESIGN AND CONSTRUCTION STANDARDS ................................................................................. 15 D. VEGETATION MANAGEMENT ........................................................................................................ 15 E. INSPECTIONS ..................................................................................................................................... 17 F. WORKFORCE TRAINING .................................................................................................................... 18 VIII. RECLOSING POLICY .................................................................................................................... 18 IX. ISOLATION ...................................................................................................................................... 18 X. COMMUNITY OUTREACH AND PUBLIC AWARENESS .......................................................... 19 XI. METRICS AND ASSUMPTIONS FOR MEASURING PLAN PERFORMANCE ........................ 19 A. IM PACT OF MET RIC S ON PLAN ..................................................................................................... 19 XII. MONITORING AND AUDITING THE PLAN ............................................................................... 20 A. IDENTIFYING AND CORRECTING DEFICIENCIES IN THE PLAN ....................................................... 20 B. MONITORING THE EFFECTIVENESS OF INSPECTIONS ..................................................................... 20 XIII. INDEPENDENT AUDITOR .............................................................................................................. 20 APPENDIX A – LOCATION MAPS .............................................................................................................. 22

Silicon Valley Power Wildfire Mitigation Plan
June 2023
4 I. CONTEXT SETTING INFORMATION
Utility Name SVP
Service Territory Size [_19.2_] square miles
Owned Assets Transmission Distribution Generation
Number of Customers
Served
[_57,998_] customer accounts
Population Within Service
Territory
[__132,925__] people
Customer Class Makeup
Number of Accounts Share of Total Load (MWh)
[_85_]% Residential;
[_1_]% Government;
[_0_]% Agricultural;
[_12_]% Small/Medium Business;
[_3_]% Commercial/Industrial
[_7_]% Residential;
[_0_]% Government;
[_0_]% Agricultural;
[_2_]% Small/Medium Business;
[_91_]% Commercial/Industrial
Service Territory
Location/Topography1
[_0_]% Agriculture
[_0_]% Barren/Other
[_0_]% Conifer Forest
[_0_]% Conifer Woodland
[_0_]% Desert
[_0_]% Hardwood Forest
[_0_]% Hardwood Woodland
[_0_]% Herbaceous
[_0_]% Shrub
[_100_]% Urban
[_0_]% Water
Service Territory
Wildland Urban Interface2
(based on total area)
[_0_]% Wildland Urban Interface;
[_100_]% Wildland Urban Intermix;
Percent of Service
Territory in CPUC High Fire
Threat Districts
(based on total area)
☐Includes maps
Tier 2: [_0_]%
Tier 3: [_0_]%
Prevailing Wind Directions
& Speeds by Season
☐ Includes maps
[Spring – NW/9kts, Summer – NW/9kts, Fall – NW/8kts, Winter – SE/10kts] REF: Wind history map

1 This data shall be based on the California Department of Forestry and Fire Protection, California Multi-Source Vegetation Layer Map, depicting WHR13 Types (Wildlife Habitat Relationship classes grouped into 13 major land cover types) available at: https://www.arcgis.com/home/item.html?id=b7ec5d68d8114b1fb2bfbf4665989eb3. 2 This data shall be based on the definitions and maps maintained by the United States Department of Agriculture, as most recently assembled in The 2010 Wildland-Urban Interface of the Conterminous United States, available at https://www.fs.fed.us/nrs/pubs/rmap/rmap_nrs8.pdf.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
5 Miles of Owned Lines
Underground and/or
Overhead
Overhead Dist.: [__187__] miles
Overhead Trans. [__31__] miles
Underground Dist: [__375__] miles
Underground Trans.: [__5__] miles
Explanatory Note 1 – Methodology for Measuring “Miles”: Circuit Miles Explanatory Note 2 – Description of Unique Ownership Circumstances: Two lines outside of SVP service territory are maintained and operated by an IOU:

1. Grizzly-Bucks Creek. 3.4 miles, 100% owned by SVP. Data included in this table.

2. Castlerock-Lakeville. 4.8% owned by SVP
Explanatory Note 3 – Additional Relevant Context: 2.1% of lines are outside SVP service territory
Percent of Owned Lines in
CPUC High Fire Threat
Districts
Overhead Distribution Lines as % of Total Distribution System (Inside and Outside Service Territory)
Tier 2: [_0_]%
Tier 3: [_0_]%
Overhead Transmission Lines as % of Total Transmission System (Inside and Outside Service Territory)
Tier 2: [_2_]%
Tier 3: [_0_]%
Percent of Service
Territory in CAL FIRE FRAP
Map Fire Threat Zones
☐ Includes maps
Extreme: [_0_]%
Very High: [_0_]%
High: [_0_]%
Customers have ever lost
service due to an IOU PSPS
event?
Yes No
Customers have ever been
notified of a potential loss
of service to due to a
forecasted IOU PSPS
event?
Yes No
Has developed protocols
to pre-emptively shut off
electricity in response to
elevated wildfire risks?
Yes No
Has previously pre-
emptively shut off
electricity in response to
elevated wildfire risk?
Yes No
If yes, then provide the following data for calendar year 2020:

Number of shut-off events: [__1__] -*event occurred outside of service territory and no customers were affected.

Customer Accounts that lost service for >10 minutes: [__0__] For prior response, average duration before service restored: [__24_hrs_]

Silicon Valley Power Wildfire Mitigation Plan
June 2023
6 II. PUC 8387(B) REQUIREMENTS TABLE
PUC
8387
Requirement Location in
WMP
(A) An accounting of the responsibilities of persons responsible for executing the plan.

Page 11 ends

(B) The objectives of the wildfire mitigation plan. Page 10 (C) A description of the preventive strategies and programs to be adopted by the local publicly owned electric utility or electrical cooperative to minimize the risk of its electrical lines and equipment causing catastrophic wildfires, including consideration of dynamic climate change risks.

Pages 15-
19 (D) A description of the metrics the local publicly owned electric utility or electrical cooperative plans to use to evaluate the wildfire mitigation plan’s performance and the assumptions that underlie the use of those metrics.

Page 20 ends

(E) A discussion of how the application of previously identified metrics to previous wildfire mitigation plan performances has informed the wildfire mitigation plan.

Page 21 ends

(F) Protocols for disabling reclosers and deenergizing portions of the electrical distribution system that consider the associated impacts on public safety, as well as protocols related to mitigating the public safety impacts of those protocols, including impacts on critical first responders and on health and communication infrastructure.

Page 19 ends

(G) Appropriate and feasible procedures for notifying a customer who may be impacted by the deenergizing of electrical lines. The procedures shall direct notification to all public safety offices, critical first responders, health care facilities, and operators of telecommunications infrastructure with premises within the footprint of potential de- energization for a given event.

Not
Applicable
(H) Plan for vegetation management Page 16-18
(I) Plans for inspections of the local publicly owned electric utility’s or electrical cooperative’s electrical infrastructure.

Page 18 ends

(J)(i,ii) A list that identifies, describes, and prioritizes all wildfire risks, and drivers for those risks, throughout the local publicly owned electric utility’s or electrical cooperative’s service territory. The list shall include, but not be limited to, both of the following:
(i)Risks and risk drivers associated with design, construction, operation, and maintenance of the local publicly owned electric utility’s or electrical cooperative’s equipment and facilities.
(ii)Particular risks and risk drivers associated with topographic and climatological risk factors throughout the different parts of the local publicly owned electric utility’s or electrical cooperative’s service territory.

Page 13 ends

(K) Identification of any geographic area in the local publicly owned electric utility’s or electrical cooperative’s service territory that is a higher wildfire threat than is identified in a commission fire threat map, and identification of where the commission should expand a high fire- threat district based on new information or changes to the environment.

Page 14 ends

Silicon Valley Power Wildfire Mitigation Plan
June 2023
7 (L) A methodology for identifying and presenting enterprise- wide safety risk and wildfire-related risk.

Page 14 ends

(M) A statement of how the local publicly owned electric utility or electrical cooperative will restore service after a wildfire.

Page 19 ends

(N)
(i,ii,iii)
A description of the processes and procedures the local publicly owned electric utility or electrical cooperative shall use to do all of the following:
(i) Monitor and audit the implementation of the wildfire mitigation plan. (ii) Identify any deficiencies in the wildfire mitigation plan or its implementation and correct those deficiencies.
(iii) Monitor and audit the effectiveness of electrical line and equipment inspections, including inspections performed by contractors, that are carried out under the plan, other applicable statutes, or commission rules.

Page 21 ends

III. OVERVIEW

A. Policy Statement
Silicon Valley Power (SVP) is the City of Santa Clara’s municipally owned electric utility. SVP’s mission and overarching goal is to provide safe, reliable, affordable, and sustainable energy services with exceptional customer focus. In order to meet this goal, SVP constructs, maintains, and operates its own electrical lines and equipment. SVP carries out these activities in a manner that minimizes the risk of catastrophic wildfire posed by its electrical lines and equipment.

B. Purpose of the Wildfire Mitigation Plan
This Wildfire Mitigation Plan describes the range of activities that SVP is taking to minimize the risk of wildfires ignited by its electrical lines and equipment, including its various programs, policies, and procedures. This plan is subject to direct approval and oversight by the Santa Clara City Council and is implemented by the Santa Clara City Manager. This plan complies with the requirements of Public Utilities Code section 8387 for publicly owned electric utilities to prepare a wildfire mitigation plan by January 1, 2020, and annually thereafter. The Wildfire Mitigation Plan and the Independent Evaluator report are posted on the SVP website located at (https://www.siliconvalleypower.com/svp-and-community/safety/wildfire-mitigation-plan) SVP is a department within the City of Santa Clara (City). SVP coordinates closely with the City’s Fire Department and Police Department in the planning for and response to any emergency event within the City. SVP also owns, operates and maintains remote transmission assets outside the limits of the City as further described below and shown in Appendix A. SVP coordinates with local fire and other public safety agencies that have jurisdictions in those locations.

SVP’s service territory is contiguous with the City of Santa Clara city limits with limited exceptions in neighboring jurisdictions. The City is an urban environment and is surrounded on all sides by urban environments in other Cities. Pursuant to Public Utilities Code section 8387(b)(2) the City Council has determined that, based on historical fire data and local conditions, and in consultation with the Fire Department that there is no significant risk of catastrophic wildfire

Silicon Valley Power Wildfire Mitigation Plan
June 2023
8 resulting from electrical lines and equipment located within SVP’s geographical service area.

Outside of SVP’s geographic service area, SVP operates electrical lines and equipment in five separate remote locations in Northern California. Some of these remote assets are located in a CPUC High Fire Threat District. The Wildfire Mitigation Plan contains a description of the operations and equipment that Silicon Valley Power utilizes to minimize the risk of wildfire being ignited by our assets with specific strategies for our assets that are located in high fire hazard severity areas, high fire threat areas, or areas we have determined have a high risk for sustaining a destructive wildfire.

SVP owns remote transmission assets, including, but not limited to, wires, poles, and other equipment needed to safely deliver power generated from generation assets located outside the City limits to the grid as more fully described below:
 Grizzly Tie Line - SVP owns the Grizzly Hydroelectric Project (Grizzly), a part of the Bucks Creek Project, FERC No. 619, located in Plumas County, California, as set forth in the Grizzly Development and Mokelumne Settlement Agreement by and between Pacific Gas and Electric (PG&E) and Santa Clara, dated March 8, 1990, as amended (Grizzly Agreement). Through the project, SVP owns approximately 3.4 miles of a 115 kV generation tie line, extending from the Grizzly powerhouse to, and including the end structure and disconnect switch, near Bucks Creek Powerhouse and all other facilities necessary for interconnection with PG&E's transmission system. PG&E operates and maintains this project including the generation tie line through the Grizzly Operations and Maintenance Agreement. The generation tie line is included as part of PG&E’s Wildfire Mitigation Plan.
 Black Butte Tie Line - SVP owns the Black Butte Hydroelectric Project (Black Butte), FERC No. 3190 dated May 5, 1983 and amended June 5, 1987. Through this project, SVP owns a9.5 mile long 60kV generation tie line interconnecting the project to PG&E’s existing 60 kV line near the City of Orland, California. SVP operates and maintains the generation tie line.
 Stony Gorge Tie Line - SVP owns the Stoney Gorge Hydroelectric Project (Stoney Gorge), FERC No. 3193 dated July 15, 1983. Through this project, SVP owns a one mile-long, 60 kV generation tie line connecting the project with PG&E’s Elk Creek Substation north of the powerhouse. SVP operates and maintains the generation tie line.  High Line Canal Interconnection - SVP owns the High Line Canal Hydroelectric Project (High Line), FERC No. 7252 dated July 17, 1984. Through this project, SVP owns an approximately 75 foot long 12 kV three phase generation tie line that interconnects with existing PG&E lines. SVP operates and maintains the generation tie line.  Castle Rock- Lakeville Transmission Line - SVP has a 4.98 percent ownership interest in a 230 kV double circuit transmission line between Castle Rock Junction and Lakeville Substation in the Geysers, as set forth in the Agreement of Co-Tenancy in the Castle Rock Junction-Lakeville 230 kV Transmission Line, dated June 1, 1984. This line supports SVP’s share of the Geothermal Generation Project with the Northern California Power Agency

Silicon Valley Power Wildfire Mitigation Plan
June 2023
9 (NCPA). PG&E has a 77.2 percent ownership interest in the line, and is responsible for operations and maintenance.

Appendix A contains maps showing the geographic areas of these assets.

C. Organization of the Wildfire Mitigation Plan
This Wildfire Mitigation Plan included the following elements:
 Objectives of the plan;
 Roles and responsibilities for carrying out the plan;  Identification of key wildfire risks and risk drivers;  Description of wildfire prevention, mitigation, and response strategies and programs;  Reclosing Policy
 De-Energization Policy
 Community outreach and education;
 Metrics for evaluating the performance of the plan and identifying areas for improvement; and
 Review and validation of the plan.

IV. OBJECTIVES OF THE WILDFIRE MITIGATION PLAN

A. Minimizing Sources of Ignition
The primary goal of this Wildfire Mitigation Plan is to minimize the probability that SVP owned electrical lines and equipment may be the origin or contributing source for the ignition of a vegetation fire. This plan is intended to supplement, but not replace or duplicate applicable building and fire codes. SVP has evaluated its physical assets, operations, and training that can help to meet this objective. Through this evaluation, SVP has identified prudent and cost effective improvements that have been implemented.

B. Resiliency of the Electric Grid
The secondary goal of this Wildfire Mitigation Plan is to improve the resiliency of the electric grid.

As part of the development of this plan, SVP assesses new industry practices and technologies that will reduce the likelihood of an interruption (frequency) in service and improve the restoration (duration) of service.

C. Identifying Unnecessary or Ineffective Actions
The goal for this Wildfire Mitigation Plan is to measure the effectiveness of specific wildfire mitigation strategies. Where a particular action, program component, or protocol is determined to be unnecessary or ineffective, SVP will assess whether a modification or replacement is merited. This plan will also help determine if more cost-effective measures would produce the same or improved results.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
10 V. ROLES AND RESPONSIBILITIES

A. Utility Governance Structure

The City of Santa Clara is a charter city located in the state of California and has adopted a Council/Manager form of government. Pursuant to its charter, the City has the power to furnish electric utility service within its service territory. In connection therewith, the City has the powers of eminent domain, to contract, to construct works, to fix rates and charges for commodities or services it provides and to incur indebtedness. The City provides electric utility service through its electric utility department under the trademarked name of “Silicon Valley Power.” The legal responsibilities and powers of the City are exercised by the elected seven-member Santa Clara City Council. The City Council appoints the Santa Clara City Manager who acts as the Chief Executive Officer for the City. SVP is operated under the direction of the Chief Electric Utility Officer who, together with certain other senior managers of SVP, is appointed by and reports to the Santa Clara City Manager. The Chief Electric Utility Officer is responsible for the implementation of this Wildfire Mitigation Plan.

B. Wildfire Prevention
The Electric Chief Operating Officer coordinates the day-to-day operation of the utility through the Assistant Directors. The Electric Chief Operating Officer is specifically responsible for the following:
 Assuring that all employees receive regular training as required for the implementation of this Wildfire Mitigation Plan.
 Complying with relevant federal, state, and industry standard requirements, including the industry standards established by the California Public Utilities Commission.

City Manager
Chief Electric Utility
Officer
Assistant Director –
Resource Planning &
Customer
Engagement
Electric Utility Chief
Operating Officer
City Attorney
Assistant Director –
Customer
Development &
Project Management
Assistant Director –
Electric Utility
Operations
Assistant Director –
Business Services
Santa Clara City Council

Silicon Valley Power Wildfire Mitigation Plan
June 2023
11 The Assistant Director of Electric Utility Operations is specifically responsible for operating and maintaining the system in a manner that will minimize potential wildfire risks including, but not limited to:
 Taking all reasonable and practicable actions as described in the Wildfire Mitigation Plan to minimize the risk of a catastrophic wildfire caused by SVP’s electric facilities.  Coordinating with federal, state, and local fire management personnel as necessary or appropriate to implement the Wildfire Mitigation Plan.
 Collecting and maintaining wildfire data necessary for the implementation of this Wildfire Mitigation Plan.
 Taking corrective action when the staff witnesses or is notified that fire protection measures have not been properly installed or maintained.

All SVP employees and contractors are responsible for actively taking precautions to prevent fires, reporting potentially unsafe conditions and immediately report fires, pursuant to existing SVP’s practices and the requirements of this Wildfire Mitigation Plan.

C. Wildfire Response and Recovery
All SVP employees and contractors are responsible for immediately reporting fires by calling 911 and providing all information required for responsible fire agencies to respond. If the fire involves or is in the vicinity of any SVP facility, SVP’s Electric Control should be notified immediately after calling 911.

If the facility is operated under SVP control (Black Butte, Highline and Stony Gorge), Electric Control shall verify with the caller that 911 has been notified and then act to isolate any line or other facility potentially creating a hazard to the first responders. If a facility is already isolated, Electric Control will take any action necessary to assure that it is not re-energized until it is safe to do so. Electric Control will dispatch appropriate personnel to coordinate with first responders and then promptly notify management through the text and email notification process.

If the facility is operated under PG&E control (Grizzly and Castle Rock/Lakeville), Electric Control shall verify with the caller that 911 has been notified and then promptly notify management through the text and email notification process.

The Electric Chief Operating Officer is responsible for notifying the Chief Electric Utility Officer and City Manager’s Office. The City Manager is responsible for informing the City Council as appropriate.

The Assistant Director of Utility Operations will coordinate SVP’s investigation into any fire involving SVP facilities and will coordinate with the appropriate fire or other agency investigations. The Assistant Director of Utility Operations will also coordinate restoration of SVP facilities.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
12 VI. WILDFIRE RISKS AND DRIVERS ASSOCIATED WITH DESIGN, CONSTRUCTION,

OPERATION, AND MAINTENANCE

A. Particular Risks and Risk Drivers Associated with Topographic and Climatological Risk Factors
As discussed above, there is no significant risk of catastrophic wildfire within SVP’s service territory. However, to ensure reliability and high levels of customer safety and service, SVP performs vegetation management through an area trimming program throughout its service territory on a five year cycle and enhanced focus areas based on outage history in addition to annual and five year asset inspection programs.

Although specific risks differ for each line outside of the SVP service territory, risks associated with extended drought, changing weather patterns and climate change apply to all of the lines.

Each of the lines with the exception of the High Line Canal Interconnection are considered transmission lines operating at the 60kV, 115kV or 230kV. For the initial evaluation of the risks, SVP compared location of our remote lines to the CPUC High Fire Threat District Map and the Cal Fire California Fire Hazard Severity Zone Map.

The Grizzly Tie Line is located in the CPUC Tier 3 Extreme Fire Threat Zone, and Cal Fire identifies the area in which the line is located in as Federal jurisdiction (US Forest Service). The mountainous terrain, heavy vegetation and the potential of lightning strikes and high winds are all risk drivers for this line. This tie line was damaged by the “Dixie” Wildfire in 2021 which burned 963,309 acres. The cause of the fire was found to be unrelated to the Grizzly Tie Line and/or SVP assets.

The Black Butte Tie Line is not located in a CPUC Tier 2 or Tier 3 Fire Threat Zone. Approximately

3.75 miles of the 9.5 mile line are located on the edge of a Cal Fire moderate hazard zone. The terrain is flat and runs along a road through agricultural land. The line is occasionally subject to lightning strikes. The one known fire associated with the line was caused by a bird contact and was limited to a small area (less than 500 square feet) of grass between poles 82 and 83 immediately under the line on October 6th, 2015.

The Stony Gorge Tie Line is located in a CPUC Tier 2 Elevated Fire Threat Zone. Approximately 0.1 miles are located on the edge of a Cal Fire high hazard zone. The remaining 0.9 miles are located in a Cal Fire moderate hazard zone. Except for the first 250 feet of the line located at the base of an undeveloped hill, the line is constructed over level terrain. The line crosses Stony Creek then follows roads through agricultural land. There is no known fire history associated with this line.

The High Line Canal Interconnection consists of a riser, a pole mounted transformer and a 75 foot overhead span connected to a PG&E distribution line. The entire connection is over a gravel and dirt road and parking area adjacent to a cemetery. The High Line Canal Interconnection is not located in a CPUC Tier 2 or Tier 3 Fire Threat Zone. It is located on the edge of a Cal Fire moderate hazard zone. There is no significant risks and no known fire history from the High Line Canal Interconnection.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
13 The Castle Rock Lakeville Transmission Line is located in the CPUC Tier 2 elevated and Tier 3 Extreme Fire Threat Zones. The line runs through Cal Fire moderate, high and very high hazard zones as well as areas notated as Federal jurisdiction. The communities, mountainous terrain, heavy vegetation and the potential of and high winds are all risk drivers for this line. This line is operated and maintained by PG&E the majority owner and is covered by PG&E’s Wildfire Mitigation Plan.

B. Identifying and Presenting Enterprisewide Safety Risk Safety of life and property including mitigation of wildfire risk are part of the culture of SVP.

Enterprise risks associated with wildfire including design and construction standards, vegetation management and operational practices have been reviewed by senior utility staff. Experts in vegetation management have been consulted. Discussions with other utilities and experts have occurred to assure that SVP’s standards meet or exceed the standards in the industry. The potential risks and this mitigation plan have been presented to SVP’s governing body, the Santa Clara City Council and SVP staff.

A diverse team of SVP staff including System Operators, Engineers, and Senior Managers meets monthly to review the Wildfire Mitigation Plan and vegetation management updates. The electric utility operations group works with SVP’s contracted professional tree service company and other contractors to perform annual vegetation inspections as well as inspections of SVP’s electrical assets.

In 2019, SVP also developed a System Operations Procedure for Wildfire Mitigation which SVP’s System Operators use to help SVP adhere to this Wildfire Mitigation Plan. The SOP contains detailed roles and responsibilities, and procedures to be followed during various events.

C. Changes to CPUC Fire Threat Map
During its review of SVP facilities, SVP has not identified any areas having a higher wildfire threat than has been identified in the CPUC maps. No new information or changes to the environment were identified that would justify that the CPUC should expand its maps.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
14 VII. WILDFIRE PREVENTATIVE STRATEGIES

A. High Fire Threat District
SVP directly participated in the development of the California Public Utilities Commission’ s (CPUC) Fire-Threat Map,3 which designates a High-Fire Threat District. In the map development process, SVP served as a territory lead, and worked with utility staff and local fire & government officials to identify the areas of SVP’s service territory that are at an elevated or extreme risk of power line ignited wildfire. None of SVP’s service territory nor any territory adjacent to SVP has been designated as a Tier 1, 2, or 3 threat area.

B. Weather Monitoring
The SVP assets located in Glenn and Tehama Counties of California; the Black Butte tie line, Stony Gorge tie line, and the High Line Canal connection, are operated by SVP. Of these assets only the Stony Gorge tie line is located in a wildfire threat area (Tier 2). SVP operates all three of these lines as if they were all within a wildfire threat area. The SVP Electric System Operator monitors current and forecasted weather and associated fire danger data from a variety of sources including:
 ONCC Significant Fire Potential (Website - Primary Source)  NWS Fire Weather Zone Map (Website - Back-up Source)
 PG&E PSPS Map and Portal (Website - Corroborative Source)  NWS Watches, Warnings or Advisories; Glenn County (Website - Corroborative Source) During wildfire season4, the SVP Electric System Operators will monitor the ONCC Significant Fire Potential website on a daily basis to identify the fire risk and corresponding response.

Risk Categories:

1. Moist (Little or Low Risk): During moist conditions, all SVP staff and contractors involved in the operation and maintenance of the lines in Glenn and Tehama Counties will be made aware of the low-risk conditions in all safety tailboard briefings. No changes are made to operations or work policy.

2. Dry (Low risk of large fires in the absence of a “High Risk” event): During dry conditions, all SVP staff and contractors involved in the operation and maintenance of the lines in Glenn and Tehama Counties will be made aware of the low-risk conditions in all safety tailboard briefings. No changes are made to operations or work policy.

3. Very Dry (Low/Moderate risk of large fires in the absence of a “High Risk” event): During very dry conditions, all SVP staff and contractors involved in the operation and maintenance of the lines in Glenn and Tehama Counties will be made aware of the Very Dry conditions and will include wildfire safety in all safety tailboard briefings.

3 Adopted by CPUC Decision 17-12-024.
4 Wildfire season is generally defined by SVP as the period typically between May 1st and October 31st unless determined by the SVP Senior Electric and Water System Operator the season needs to be extended due to conditions that may present in any given year.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
15 4. High Risk Days: 20% Chance of a large fire due to a combination of dry or very dry fuel and an ignition trigger, or dry or very dry fuel combined with a critical burn environment.

During High-Risk days, all SVP staff and contractors involved in the operation and maintenance of the lines in Glenn and Tehama Counties will be made aware of the High Risk and will include wildfire safety in all safety tailboard briefings. A wildfire patrol of the lines will be carried out at the onset of the High-Risk condition. If the High-Risk conditions continue for an extended period of 7 days or more, patrols are to be carried out weekly.

5. Red Flag Warnings: If the National Weather Service declares a Red Flag Warning for Glenn and Tehama Counties, all SVP staff and contractors involved in the operation and maintenance of the lines in Glenn and Tehama Counties will be made aware of the Red Flag Warning and will include wildfire safety in all safety tailboard briefings. A wildfire patrol of the lines will be carried out prior to the beginning of the Red Flag Warning, and at least daily if the risk factors persist. All power line maintenance activities will be performed with lines isolated. Consideration of isolating the lines will be made on a case- by-case basis. If a line trips due to an electrical fault, the line will be left out of service until it is patrolled and it is determined safe to be returned to service.

C. Design and Construction Standards
SVP’s electric facilities are designed and constructed to meet or exceed the relevant federal, state, or industry standard. SVP treats CPUC General Order (GO) 95 as a key industry standard for design and construction standards for overhead electrical facilities. SVP meets or exceeds all standards in GO 95. Additionally, SVP monitors and follows as appropriate the National Electric Safety Code.

At our High Line Canal Interconnection, there are expulsion fuses, however, the electrical line is located over a dirt and gravel road and is not located in a HFTD. Even though the line is not located in a high fire threat district, SVP mitigates the risk of expulsion fuses as if it were in a HFTD by maintaining a 10ft radius around the poles free of vegetation and flammable materials.

In 2020, SVP installed raptor guard at 9 locations on the Black Butte 60 kV line to harden them from raptor contact. There are no other planned hardening measures at this time as SVP’s policy is to de-energize the line during high fire threat events. Annual patrols utilizing thermal and corona imaging are performed to ensure that hardware, insulators, and connectors are up to standard.

D. Vegetation Management
SVP meets or exceeds the minimum industry standard vegetation management practices. For transmission-level facilities, SVP complies with NERC FAC-003-4, where applicable. For both transmission and distribution level facilities, SVP meets: (1) Public Resources Code section 4292; (2) Public Resources Code section 4293; (3) GO 95 Rule 35; and (4) the GO 95 Appendix E Guidelines to Rule 35. These standards require significantly increased clearances in the High Fire Threat District. The recommended time-of-trim guidelines do not establish a mandatory standard, but instead provide useful guidance to utilities. SVP contracts with professional tree service company who has Subject Matter Experts (SMEs) in vegetation management and uses

Silicon Valley Power Wildfire Mitigation Plan
June 2023
16 specific knowledge of growing conditions and tree species to determine the appropriate time of trim clearance in each circumstance. SVP does not use herbicides or growth inhibitors.

Although SVP’s service territory is not in an area with high wildfire potential, SVP hires a professional tree service company to systematically trim and remove trees to maintain required clearances from overhead circuits.

SVP treats its facilities located in Glenn and Tehama Counties to be within a High Fire Threat District. As these facilities are 60kV lines totaling no more than 11 miles in length and are easily accessible, SVP employs the following methodology for vegetation control. On an annual basis, SVP contracts with a professional tree service company to perform an inventory of trees in the proximity of facilities in Glenn and Tehama Counties. This inventory is recorded electronically and a scope of work for tree trimming, and removal is created. This scope of work is also completed in the same year and a report by the professional tree service company is provided to SVP.

GO 95, Rule 35, Table 1
Case Type of Clearance Trolley
Contact,
Feeder and
Span Wires,
0-5kV
Supply
Conductors
and Supply
Cables, 750 -
22,500 Volts
Supply
Conductors
and Supply
Cables, 22.5 -
300 kV
Supply
Conductors
and Supply
Cables, 300 -
550 kV (mm)
13 Radial clearance of
bare line conductors
from tree branches
or foliage
18 inches 18 inches ¼ Pin
Spacing
½ Pin
Spacing
14 Radial clearance of
bare line conductors
from vegetation in
the Fire-Threat District
18 inches 48 inches 48 inches 120 inches

Appendix E
Guidelines to Rule 35
The radial clearances shown below are recommended minimum clearances that should be established, at time of trimming, between the vegetation and the energized conductors and associated live parts where practicable. Reasonable vegetation management practices may make it advantageous for the purposes of public safety or service reliability to obtain greater clearances than those listed below to ensure compliance until the next scheduled maintenance. Each utility may determine and apply additional appropriate clearances beyond clearances listed below, which take into consideration various factors, including: line operating voltage, length of span, line sag, planned maintenance cycles, location of vegetation within the span, species type, experience with particular species, vegetation growth rate and characteristics, vegetation management standards and best practices,

Silicon Valley Power Wildfire Mitigation Plan
June 2023
17 local climate, elevation, fire risk, and vegetation trimming requirements that are applicable to State Responsibility Area lands pursuant to Public Resource Code Sections 4102 and 4293.

Voltage of Lines Case 13 Case 14
Radial clearances for any conductor of a line
operating at 2,400 or more volts, but less than
72,000 volts
4 feet

12 feet

Radial clearances for any conductor of a line
operating at 72,000 or more volts, but less than
110,000 volts
6 feet

20 feet

Radial clearances for any conductor of a line
operating at 110,000 or more volts, but less than
300,000 volts
10 feet

30 feet

Radial clearances for any conductor of a line
operating at 300,000 or more volts
15 feet

30 feet

E. Inspections
SVP meets or exceeds the minimum inspection requirements provided in CPUC GO 165 and CPUC GO 95, Rule 18. SVP staff and contracted SMEs uses their knowledge of the specific environmental and geographical conditions to determine the required frequency of inspections.

Separate vegetation and physical inspections of the remote lines owned and operated by SVP are performed every year and additionally on an as-needed basis. These lines are visually inspected from the ground, drone, helicopter or on elevated platforms. Corona and thermal imaging technologies are also used. Any necessary repairs will be completed in a timely manner as appropriate. Any issue that is creating an eminent safety concern will be immediately addressed.

Inspections carried out on red flag days look for any emergent conditions containing but not limited to the following criteria:
 Broken or slack down guys.
 Leaning poles
 Un-balanced spans.
 Encroachment on minimum 4-foot radial clearance between conductors and vegetation.
 Broken insulators.
 Discolored conductor connections.
 Accumulation of flammable debris encroaching in the SVP facility right of way.

The SVP Electric and Water System Operator maintains procedures and tools for mitigating emergent wildfire threats associated with remote facilities owned and operated by SVP. The System Operator logs conditions and the inspection results for high risk and red flag days.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
18 SVP works to ensure that all inspections to be performed are completed before the beginning of the historic fire season. SVP monitors drought conditions and other relevant factors throughout the year to determine if inspections should be completed in a shorter timeframe.

F. Workforce training
The Electric Utility Chief Operating Officer is specifically responsible for assuring that all employees having obligations for implementation of this Wildfire Mitigation Plan receive regular training. Training on the wildfire plan are held each spring prior to the start of the wildfire season.

Training will include roles and responsibilities, identification of risks, and procedures associated with monitoring and response.

VIII. RECLOSING POLICY
SVP does not have reclosers or reclosing schemes on its remote lines.

If one of the remote lines operated and maintained by SVP is isolated due fire or high fire risk, it will only be restored after physical inspection and in accordance with SVP operating procedures under direction of an SVP Electric and Water System Control Operator and in coordination with PG&E as appropriate. SVP staff or contractors will coordinate with local public safety officials in the event of an active fire. No customers are served by these lines.

IX. ISOLATION5
All SVP remote lines are generation tie lines. SVP has the authority to preemptively isolate the lines it operates and maintains due to fire-threat conditions. No customers would be affected by the isolation of these lines. SVP will make a case-by-case decision to shut off power based on the following considerations:
 Red Flag Warnings issued by the National Weather Service for fire weather zones that contain SVP remote lines;
 SVP staff assessments of local conditions, including wind speed (sustained and gust), humidity and temperature, fuel moisture, fuel loading and data from weather stations;  Real-time information from staff and contractors located in areas identified as at risk of being subject to extreme weather conditions;
 Input from fire experts and vegetation experts;
 Input from local and state fire authorities regarding the potential consequences of wildfires in select locations;
 Availability of alternative generation resources;
 Awareness of mandatory or voluntary evacuation orders in place;  Other operational considerations to minimize potential wildfire ignitions,;

5 Beginning with the 2023 WMP, the term “de-energization” was replaced with “isolation” because according to Occupational Safety and Health Administration Standard Number 1910.269(m), a line or equipment is not considered de-energized until it is tested as de-energized. Although the operators open the lines, because there is no testing, SVP considers the lines isolated.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
19  On-going fire activity near the remote lines and throughout California;

X. COMMUNITY OUTREACH AND PUBLIC AWARENESS
This Wildfire Mitigation Plan has been submitted to the Cal Fire Tehama Glenn Unit for review. The plan was also reviewed with Orland Unit Water Association for the lines SVP operates and maintains. The mitigation plan was presented to the City of Santa Clara City Council in a public meeting for approval.

XI. METRICS AND ASSUMPTIONS FOR MEASURING PLAN PERFORMANCE SVP will track two metrics to measure the performance of this Wildfire Mitigation Plan: (1) number of fire ignitions; and (2) wires down on the remote lines.

METRIC 1: FIRE IGNITIONS
For purposes of this metric, a fire ignition is defined as follows:
 An SVP remote facility was associated with the fire;
 The fire was self-propagating and of a material other than electrical and/or communication facilities;
 The resulting fire traveled greater than one linear meter from the ignition point; and  SVP has knowledge that the fire occurred.

SVP has knowledge of one Fire Ignition associated with the Black Butte Tie Line. A bird contacted the line and a fire started in the grass immediately under the line. The fire was limited to a small area. SVP has no knowledge of other Fire Ignitions associated with its lines. Each of the lines has been in service for over 3 decades.

In future Wildfire Mitigation Plans, SVP will provide the number of fires that occurred that were less than 10 acres in size. Any fires greater than 10 acres will be individually described.

METRIC 2: WIRES DOWN
The second metric is the number of remote line wires downed. For purposes of this metric, a wires down event includes any instance where an electric distribution or transmission conductor falls to the ground or on to a foreign object.

SVP will not normalize this metric by excluding unusual events, such as severe storms. Instead, SVP will supplement this metric with a qualitative description of any such unusual events. SVP has no knowledge of any wire down on its remote lines since placed in service.

A. Impact of Metrics on Plan
Each time an event occurs within one of the metrics above, SVP will perform an analysis of the event including any design or operational recommendations for improvement. SVP will then evaluate potential improvements to the plan.

Silicon Valley Power Wildfire Mitigation Plan
June 2023
20 Between January 1, 2019 through December 31, 2022, there were no fire ignitions caused by SVP and no wires down events.

XII. MONITORING AND AUDITING THE PLAN
This Wildfire Mitigation Plan is reviewed annually by staff and presented to Santa Clara City Council on an annual basis. Staff will review activities throughout the year to determine if changes to the WMP are appropriate.

A. Identifying and correcting Deficiencies in the Plan
This wildfire mitigation plan is a living document. As the plan is implemented, SVP will compile any deficiencies identified by staff, contractors, SMEs and other sources. Improvements and corrections will be reviewed and implemented in a timely manner as appropriate. Each year the plan will be reviewed and updated prior to submittal to Santa Clara City Council.

B. Monitoring the effectiveness of inspections
Any vegetation or physical issues found during inspections will be compiled and retained for future review. Trends involving repeated issues, timeliness of issue resolution, metrics listed in section VII A, or other observations will be reviewed on an annual basis. The inspection program will be adjusted as appropriate.

XIII. INDEPENDENT AUDITOR
Public Utilities Code section 8387(c) requires SVP to contract with a qualified independent evaluator with experience in assessing the safe operation of electrical infrastructure to review and assess the comprehensiveness of this Wildfire Mitigation Plan. The independent evaluator must issue a report that is posted to SVP’s website. This report must also be presented to Santa Clara City Council at a public meeting.

In 2022, SVP hired Dudek, to review and assess the comprehensiveness of SVP’s 2022 WMP.

Dudek has conducted a number of independent evaluator reports for other publicly owned utilities. The independent evaluator report was reviewed by the internal SVP team and staff incorporated the recommended changes into its 2022 WMP. The final IE Report was noted and filed by the Santa Clara City Council on September 13, 2022. The final IE Report can be found on SVP’s website at https://www.siliconvalleypower.com/svp-and-community/safety/wildfire- mitigation-plan.

Appendix A
Location Maps

City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-1300 Agenda Date: 10/24/2023

REPORT TO COUNCIL

SUBJECT
Action to Waive Second Reading and Adopt Ordinance No. 2064 Amending Section 3.25.030 of the Santa Clara City Code to Reflect the Increase in the Transient Occupancy Tax Rate

BACKGROUND
At the October 10, 2023 Council meeting, proposed Ordinance No. 2064 was passed for the purpose of publication. Pursuant to City Charter Sections 808 and 812, a summary of proposed Ordinance No. 2064 was published to the Santa Clara Weekly on October 18, 2023, and copies were posted in three public places.

DISCUSSION
On November 3, 2020, Santa Clara voters approved the following ballot measure that allows for an increase of up to four percentage points in the City’s Transient Occupancy Tax (TOT). This ballot measure, approved by 73.57% of Santa Clara voters, supports essential City services, paid by guests staying in hotels. With this measure, the TOT can be increased from 9.5% to up to 13.5% by resolution.

On October 10, 2023, the City Council approved a Resolution increasing the TOT rate from 11.5% to

12.5%. This Ordinance brings the City Code into conformance with that Resolution.

ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California Environment Quality Act (“CEQA”) pursuant to section 15378(a)(4) of Title 14 of the California Code of Regulations in that it is a fiscal activity that does not involve any commitment to any specific project which may result in a potential significant impact on the environment.

FISCAL IMPACT
The FY 2023/24 and FY 2024/25 Adopted Budget factors in additional revenue from a one percentage point increase in the TOT rate effective January 1, 2024. This additional revenue is estimated at $1.7 million annually.

COORDINATION
This report has been coordinated with the City Attorney’s Office.

City of Santa Clara Printed on 10/20/2023Page 1 of 2
powered by Legistar™
23-1300 Agenda Date: 10/24/2023

PUBLIC CONTACT
A summary of proposed Ordinance No. 2064 was published to the Santa Clara Weekly on October 18, 2023, and copies were posted in three public places and made available for public inspection at the City Clerk’s Office.

Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] or at the public information desk at any City of Santa Clara public library.

RECOMMENDATION
Waive Second Reading and Adopt Ordinance No. 2064 Amending Section 3.25.030 of the Santa Clara City Code to Reflect the Increase in the Transient Occupancy Tax Rate Reviewed by: Kenn Lee, Director of Finance
Approved by: Jōvan D. Grogan, City Manager

ATTACHMENTS

1. Ordinance No. 2064 (Intro)
City of Santa Clara Printed on 10/20/2023Page 2 of 2
powered by Legistar™
Ordinance/Transient Occupancy Tax Rate Increase Page 1 of 3 Rev: 09/2019
ORDINANCE NO. 2064

AN ORDINANCE OF THE CITY OF SANTA CLARA,
CALIFORNIA, AMENDING SECTION 3.25.030 ( “TAX
IMPOSED”) OF CHAPTER 3.25 (“TRANSIENT OCCUPANCY
TAX”) OF “THE CODE OF THE CITY OF SANTA CLARA,
CALIFORNIA” TO REFLECT THE INCREASED TAX RATE

BE IT ORDAINED BY THE CITY OF SANTA CLARA AS FOLLOWS:

WHEREAS, On November 3, 2020, 73.57% of Santa Clara voters approved the following ballot measure (Measure E) that allowed for an increase of up to four percentage points in the City’s TOT from the starting rate of 9.5%;
;
WHEREAS, the TOT rate was increased from 9.5% to 11.5%, effective January 1, 2022, consistent with the FY 2021/22 and FY 2022/23 Biennial Operating Budget; WHEREAS, concurrently with this ordinance amendment, pursuant to the authorization granted by the voters in Measure E, the City Council is adopting a resolution increasing the TOT rate from 11.5% to 12.5%, which will be effective January 1, 2024; and WHEREAS, the City Code currently reflects a TOT rate of 11.5%, which must be amended to be consistent with the TOT rate increase.

NOW THEREFORE, BE IT FURTHER ORDAINED BY THE CITY OF SANTA CLARA AS FOLLOWS:

SECTION 1 : That Section 3.25.030 (entitled “ Tax Impos ed”) of Chapter 3.25 (entitled “Transient Occupancy Tax”) of Title 3 (entitled “Revenue and Finance”) of “The Code of the City of Santa Clara, California” (“SCCC”) is amended to read as follows:

Ordinance/Transient Occupancy Tax Rate Increase Page 2 of 3 Rev: 09/2019
“3.25.030 Tax imposed.
(a) For the privilege of occupancy in any hotel, each transient is subject to and shall pay a tax as imposed from time to tim e by City Council resolution. Said tax shall be a percentage of the rent charged by the operator to the occupant. (b) On and as of January 1, 2024 and continuing thereafter until further change by City Council resolutio n, the amount of the tax imposed is t welve and one-half percent (12.5%) of the rent charged by the operator.
(c) Said tax constitutes a debt owed by the transient to the City, which is extinguished only by payment to the operator or to the City. The transient, or any person paying rent on the transient’s behalf, shall pay the tax to the operator of the hotel at the time the rent is paid. If the rent is paid in installments, a proportionate share of the tax shall be paid with each installment. The unpaid tax shall be due upon the transient’s ceasing to occupy space in the hotel. If for any reason the tax due is not paid to the operator of the hotel, the Director of Finance may require that such tax shall be paid directly to the Director of Finance.”
SECTION 2: Ordinances Repealed. With exception of the provisions protected by the savings clause, all ordinances (or parts of ordinances) in conflict with or inconsistent with this ordinance are hereby repealed.
//
//
//
//
//
SECTION 3: Savings clause. The changes provided for in this ordinance shall not affect any offense or act committed or done or any penalty or forfeiture incurred or any right established or accruing before the effective date of this ordinance; nor shall it affect any prosecution, suit or proceeding pending or any judgment rendered prior to the effective date of this ordinance . All fee schedules shall remain in force until superseded by the fee schedules adopted by the City Council.

SECTION 4: Effective date. This ordinance shall, by its terms, take effect on and as of January 1, 2024; however, prior to its final adoption it shall be published in accordance with the requirements of Section 808 and 812 of "The Charter of the City of Santa Clara, California ."
PASSED FOR THE PURPOSE OF PUBLICATION this 10th day of October, 2023, by the following vote:

AYES: COUNCILORS: Becker , Chahal, Hardy, Jain, Park, and Watanabe, and Mayor Gillmor
NOES: COUNCILORS: None
ABSENT: COUNCILORS: None
ABSTAINED: COUNCILORS: None
ATTEST:

Attachments incorporated by reference: None
Ordinance/Transient Occupancy Tax Rate Increase
Rev: 09/2019

NORA PIMENTEL, M C

ASSISTANT CITY CLERK

CITY OF SANTA CLARA

Page 3 of 3 ends

City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-929 Agenda Date: 10/24/2023

REPORT TO STADIUM AUTHORITY BOARD

SUBJECT
Action on Stadium Authority Bills and Claims for the Month of June 2023

BOARD PILLARS
Enhance Community Engagement and Transparency
Ensure Compliance with Measure J and Manage Levi’s Stadium

BACKGROUND
Disbursements made by the Stadium Authority are based on invoices submitted for payment. Prior to payment, staff reviews all disbursement documents to ensure that the invoiced goods or services have been provided.

The Bills and Claims listing represents the cash disbursements required of normal and usual operations during June 2023. Budget control is set by the Stadium Authority Board through the budget adoption process.

DISCUSSION
Effective August 31, 2022, the Stadium Authority and Stadium Manager agreed to the timely payment of Shared Stadium Expenses and other budgeted expenses in accordance with the Annual Stadium Authority Budget, except for buffet expenses invoiced pursuant to Section 4.6.1 of the Stadium Lease. The Stadium Authority maintains the right to confirm and dispute submitted charges from the 2021-22 fiscal year and subsequent years during a fiscal-year-end reconciliation/true-up. This is primarily done to address any concerns regarding improper allocation, calculation, lack of support, or failure to comply with applicable contracts or laws, among other reasons. The Stadium Authority may raise such questions with respect to any charge at any time before a fiscal year-end reconciliation/true-up and the Stadium Manager must assess and respond to such questions in good faith.

At its March 7, 2023 meeting, the Stadium Authority Board adopted the Santa Clara Stadium Authority Fiscal Year 2023-24 Operating, Debt Service, and Capital Budget which runs from April 1, 2023 to March 31, 2024. Expenses paid in June 2023 include:
· Payments totaling $91,593.94 to the City of Santa Clara for the following:
o $83,542.56 for reimbursement of General and Administrative (G&A) City payroll costs (e.g.: Executive Director’s Office (City Manager’s Office), Counsel’s Office (City Attorney’s Office), and Treasurer’s Office (Finance Department)) o $8,051.38 for reimbursement of Stadium Authority expenses · Payment totaling $567,153.85 to Forty Niners SC Stadium Co, LLC for CFD Advance Payment - Principal & Interest
City of Santa Clara Printed on 10/20/2023Page 1 of 2
powered by Legistar™
23-929 Agenda Date: 10/24/2023
· Payment totaling $1,422,499.66 to Forty Niners Stadium Management Co, LLC for June 2023 Stadium Manager Expenses
· Payment totaling $113,487.00 to Blue’s Roofing Co. for CapEx Project - General Areas / Coatings Main Deck
· Payment totaling $48,157.41 to EyeP Solutions, Inc for CapEx Project - Enhance Stadium Security Coverage
· Payment totaling $45,566.00 to Populous Group, LLC for the following:
o $20,550.00 for CapEx Project - Women’s Locker Room
o $3,416.00 for CapEx Project - Aesthetic Improvements - Premium Areas/Special Event Spaces
o $21,600.00 for CapEx Project - Main Kitchen Equipment · Payment totaling $82,794.40 to United Mechanical, Inc for CapEx Project - Cooling Towers · Payment totaling $13,588.81 to Wilson Ihrig for Stadium Noise Monitoring Services (March 2023)

ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to section 15378(b)(4) of Title 14 of the California Code of Regulations in that it is a fiscal activity that does not involve any commitment to any specific project which may result in a potential significant impact on the environment.

FISCAL IMPACT
The fiscal impact to the Stadium Authority is $2,387,729.99

COORDINATION
This report has been coordinated with the Stadium Authority Counsel’s Office.

PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.

RECOMMENDATION
Approve the list of Stadium Authority Bills and Claims for June 2023.

Reviewed by: Kenn Lee, Treasurer
Approved by: Jōvan D. Grogan, Executive Director

ATTACHMENTS

1. June 2023 SCSA Bills and Claims
City of Santa Clara Printed on 10/20/2023Page 2 of 2
powered by Legistar™
Payment Date Vendor Invoice No. Description Fund Amount 6/15/2023 Bank of America N/A May 2023 Bank Fees (Account 0444) CapEx 1,351.05 6/15/2023 Bank of America N/A May 2023 Bank Fees (Account 0425) Operating 1,537.87 2,888.92
6/13/2023 City of Santa Clara N/A B2311 SCSA Admin Payroll Costs Operating 83,542.56 6/30/2023 City of Santa Clara N/A Reimburse City of Santa Clara for G&A Expenses Operating 8,051.38 91,593.94
6/16/2023 Forty Niners SC Stadium Co, LLC N/A CFD Advance Payment - Principal & Interest Debt Service 567,153.85 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24089 June 2023 Stadium Manager Expenses - Security Operating 130,373.00 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24090 June 2023 Stadium Manager Expenses - Stadium Ops Operating 379,102.00 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24091 June 2023 Stadium Manager Expenses - Engineering Operating 224,507.00 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24092 June 2023 Stadium Manager Expenses - Guest Services Operating 53,766.00 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24093 June 2023 Stadium Manager Expenses - Groundskeeping Operating 54,195.14 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24094 June 2023 Stadium Manager Expenses - SBL Sales & Service Operating 194,43 7.29 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24095 June 2023 Stadium Manager Expenses - Insurance Operating 91,338.36 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24096 June 2023 Stadium Manager Expenses - Utilities Operating 231,757.41 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24097 June 2023 Stadium Manager Expenses - Use of StadCo TI Operating 2,069.98 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24098 June 2023 Stadium Manager Expenses - Other G&A Operating 52,620.15 6/1/2023 Forty Niners Stadium Management Co, LLC SLS-24099 June 2023 Stadium Manager Expenses - Lender Fees Operating 8,333.33 1,422,499.66
6/21/2023 Blue's Roofing Co. 31093A CapEx Project - General Areas / Coatings Main Deck CapEx 113,487.00 6/21/2023 EyeP Solutions, Inc 23-226 CapEx Project - Enhance Stadium Security Coverage CapEx 48,157.41 6/21/2023 Populous Group, LLC 0075555 CapEx Project - Women's Locker Room CapEx 20,550.00 6/21/2023 Populous Group, LLC 0075556 CapEx Project - Aesthetic Improvements - Premium Areas/Special Event Spaces CapEx 3,416.00 6/21/2023 Populous Group, LLC 0075557 CapEx Project - Main Kitchen Equipment CapEx 21,600.00 45,566.00
6/21/2023 United Mechanical, Inc 169234 CapEx Project - Cooling Towers CapEx 82,794.40 6/9/2023 Wilson Ihrig 16125N53 Stadium Noise Monitoring Services (March 2023) Operating 13,588.81 June 2023 Total 2,387,729.99$

Santa Clara Stadium Authority
Bills and Claims
Expenses Paid by Wire or ACH Transfer
For the Month of June 2023

Page 1 of 1 ends

City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-1163 Agenda Date: 10/24/2023

REPORT TO STADIUM AUTHORITY BOARD

SUBJECT
Action on Stadium Authority Bills and Claims for the Month of July 2023

BOARD PILLARS
Enhance Community Engagement and Transparency
Ensure Compliance with Measure J and Manage Levi’s Stadium

BACKGROUND
Disbursements made by the Stadium Authority are based on invoices submitted for payment. Prior to payment, staff reviews all disbursement documents to ensure that the invoiced goods or services have been provided.

The Bills and Claims listing represents the cash disbursements required of normal and usual operations during July 2023. Budget control is set by the Stadium Authority Board through the budget adoption process.

DISCUSSION
Effective August 31, 2022, the Stadium Authority and Stadium Manager agreed to the timely payment of Shared Stadium Expenses and other budgeted expenses in accordance with the Annual Stadium Authority Budget, except for buffet expenses invoiced pursuant to Section 4.6.1 of the Stadium Lease. The Stadium Authority maintains the right to confirm and dispute submitted charges from the 2021-22 fiscal year and subsequent years during a fiscal-year-end reconciliation/true-up. This is primarily done to address any concerns regarding improper allocation, calculation, lack of support, or failure to comply with applicable contracts or laws, among other reasons. The Stadium Authority may raise such questions with respect to any charge at any time before a fiscal year-end reconciliation/true-up and the Stadium Manager must assess and respond to such questions in good faith.

At its March 7, 2023 meeting, the Stadium Authority Board adopted the Santa Clara Stadium Authority Fiscal Year 2023-24 Operating, Debt Service, and Capital Budget which runs from April 1, 2023 to March 31, 2024. Expenses paid in July 2023 include:
· Payments totaling $636,121.43 to the City of Santa Clara for the following:
o $141,121.43 for reimbursement of General and Administrative (G&A) City payroll costs (e.g.: Executive Director’s Office (City Manager’s Office), Stadium Authority Counsel’s Office (City Attorney’s Office), and Treasurer’s Office (Finance Department)) o $495,000.00 for FY2023-24 Ground Lease Rent
· Payment totaling $3,530,646.64 to Forty Niners Stadium Management Co, LLC for July 2023 City of Santa Clara Printed on 10/20/2023Page 1 of 2
powered by Legistar™
23-1163 Agenda Date: 10/24/2023
Stadium Manager Expenses
· Payment totaling $181,579.20 to Blue’s Roofing Co. for CapEx Project - General Areas / Coatings Main Deck
· Payment totaling $1,265,721.58 to Devcon Construction, Inc. for CapEx Project - New Seating - Bowl Padded Seat Replacement Project
· Payment totaling $76,936.90 to EyeP Solutions, Inc. for CapEx Project - Bowl Camera Upgrade / Refurbishment
· Payment totaling $17,994.55 for Legal Services (May 2023) · Payment totaling $4,863.99 to InTWO, Inc. for FMS Monthly Services (May 2023) · Payment totaling $4,245.00 to M. Arthur Gensler Jr. & Associates, Inc. for the following:
o $1,520.00 for CapEx Project - Concrete Replacements
o $2,725.00 for CapEx Project - Stadium Event Signage

ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to section 15378(b)(4) of Title 14 of the California Code of Regulations in that it is a fiscal activity that does not involve any commitment to any specific project which may result in a potential significant impact on the environment.

FISCAL IMPACT
The fiscal impact to the Stadium Authority is itemized above.

COORDINATION
This report has been coordinated with the Stadium Authority Counsel’s Office.

PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.

RECOMMENDATION
Approve the list of Stadium Authority Bills and Claims for July 2023.

Reviewed by: Kenn Lee, Treasurer
Approved by: Jōvan D. Grogan, Executive Director

ATTACHMENTS

1. July 2023 SCSA Bills and Claims
City of Santa Clara Printed on 10/20/2023Page 2 of 2
powered by Legistar™
Payment Date Vendor Invoice No. Description Fund Amount 7/17/2023 Bank of America N/ A June 2023 Bank Fees - CapEx Reserve Account CapEx 843.49 7/17/2023 Bank of America N/ A June 2023 Bank Fees - Operating Reserve Account Operating 433.22 1,276.71
7/17/2023 City of Santa Clara N/ A B2312 SCSA Admin Payroll Costs Operating 67,249.24 7/24/2023 City of Santa Clara N/ A B2313 SCSA Admin Payroll Costs Operating 73,872.19 7/19/2023 City of Santa Clara 94332 FY2023-24 Ground Lease Rent Operating 495,000.00 636,121.43
7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Securit y Operating 132,276.03 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Stadium Ops Operating 381,670.06 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Engineering Operating 226,068.86 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Guest Services Operating 54,270.34 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Groundskeeping Operating 55,112.25 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - SBL Sales & Service Operating 209,57 5.57 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Insurance Operating 2,191,996.00 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Utilities Operating 215,671.98 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Use of StadCo Tenant Improvements O perating 3,588.08 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Other G& A Operating 52,084.14 7/3/2023 Forty Niners Stadium Management Co, LLC SLS-24140 July 2023 Stadium Manager Expenses - Lender Fees Operating 8,333.33 3,530,646.64
7/5/2023 Blue's Roofing Co. 31106 CapEx Project - General Areas / Coatings Main Deck CapEx 181,579.20 7/18/2023 Devcon Construction, Inc. 88410 CapEx Project - New Seating - Bowl Padded Seat Replacement Project CapEx 1,265,721.58 7/18/2023 EyeP Solutions, Inc. 23-212 CapEx Project - Bowl Camera Upgrade / Refurbishment CapEx 76,936.90 7/6/2023 Hanson Bridgett LLP 1349531 Legal Services (May 2023) Operating 17,994.55 7/6/2023 InTWO, Inc. 40546 FMS Monthly Services (May 2023) Operating 4,863.99 7/5/2023 M. Arthur Gensler Jr. & Associates, Inc. 1067790 CapEx Project - Concrete Replacements CapEx 1,520.00 7/5/2023 M. Arthur Gensler Jr. & Associates, Inc. 1070391 CapEx Project - Stadium Event Signage CapEx 2,725.00 4,245.00
July 2023 Total 5,719,386.00$

Santa Clara Stadium Authority
Bills and Claims
Expenses Paid by Wire or ACH Transfer
For the Month of July 2023

Page 1 of 1 ends

City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-558 Agenda Date: 10/24/2023

REPORT TO STADIUM AUTHORITY BOARD

SUBJECT
Action on Agreements to Provide Comprehensive Banking Services to the Stadium Authority

COUNCIL PILLAR
Ensure Compliance with Measure J and Manage Levi’s Stadium

BACKGROUND
The Santa Clara Stadium Authority (Authority) is responsible for overseeing and managing all of its treasury activities, including managing banking relationships, paying expenditures, handling cash receipts, and safekeeping of the Authority investments and securities.

In 2012, the Authority selected Bank of America to act as its depository bank as part of the Deposit and Disbursement Agreement with Forty Niners SC Stadium Company, LLC, Stadium Funding Trust (Trust), Goldman Sachs Bank USA (Trustee), U.S. Bank National Association (US Bank), and Bank of America. Goldman Sachs Bank USA’s Trustee role, which is to act at the direction of the creditors, was later transferred to US Bank in 2013. As a depository bank, Bank of America is responsible for holding the monies and distributing the funds based on the instruction of the Trustee. The bank cannot invest or transfer monies without the Trustee’s request and approval. After serving as the depository bank for 11 years, Bank of America resigned in April 2023. This action along with the new funds coming in for the Renovation/Demolition Reserve prompted staff to initiate a comprehensive review of the Authority’s banking needs. During this review, staff identified three specific areas, as outlined below:
· General Banking Services - This entails providing daily operational banking services. The services include processing deposits and disbursements utilizing wire or ACH transfers, providing online access to accounts, and generating detailed monthly reports. Bank of America is the current bank for this service.
· Investment Services - The Authority expects to transfer its annual excess revenue to the Renovation/Demolition Reserve each year until it reaches, under the terms of current Stadium agreements, $70 million. The current reserve fund balance is approximately $5.3 million. Due to limited staff capacity and expertise, the Authority intends to engage an outside investment firm to effectively manage the investment of these funds. The investment firm will manage the Authority’s portfolio in accordance with the California Government Code. Currently, the Authority does not have an active investment portfolio management firm. · Custodian Banking Services - This involves providing settlement, safekeeping, and reporting services for the Authority’s investment portfolio, including marketable securities and cash.

Currently, the Authority does not have this service because there is no current active City of Santa Clara Printed on 10/20/2023Page 1 of 5
powered by Legistar™
23-558 Agenda Date: 10/24/2023
investment portfolio management service.

The purpose of this report is to request authorization to negotiate and execute agreements with financial institutions to fulfill the Authority’s required banking services.

DISCUSSION
General Banking Services
On July 13, 2020, the City Council authorized the City Manager to enter into an agreement with JPMorgan Chase (JPM) for general banking services on behalf of the City. JPM was selected through a competitive Request for Proposals (RFP) process conducted in 2019. Under the agreement, JPM provides the City with various general banking services, similar to the services provided by Bank of America to the Authority. The City’s agreement with JPM stipulated that in the event that the Authority desired to enter into an agreement, the same terms and conditions would be applicable to the Authority.

JPM offers a full range of banking and depository services, provides a dedicated team of experienced professionals, demonstrates superior online and technology capabilities, and offers competitive earnings credit and deposit rates. By leveraging the City’s current agreement with JPM, the Authority will benefit from favorable fees typically reserved for very large public funds. As a result, staff recommends that the Authority is authorized to negotiate and execute an agreement with JPM for general banking services.

The proposed agreement with JPM has an initial term of two years, with the Authority having the discretion to exercise one five-year option to extend the term of the agreement, subject to JPM’s approval of terms. The estimated maximum compensation for the initial two-year term is $35,793, or $17,897 annually. Under the previous agreement with Bank of America, the Authority was paying approximately $27,787 per year. With the new agreement with JPM, the Authority will achieve cost savings of $9,890 per year.

Final terms and conditions of the agreement are currently being finalized with JPM. The draft form of the agreement is included as an attachment to this report.

Investment Services
On July 14, 2020, the City Council authorized the City Manager to enter into an agreement with PFM Asset Management (PFMAM) for investment advisory and portfolio management services on behalf of the City. PFMAM was also selected through a competitive procurement process conducted in 2020. Under the agreement, PFMAM provides prudent investment strategies, ensures sufficient cash liquidity, works with the City’s custodian for safekeeping of securities, provides services required to execute and settle investment trades, provides monthly reports of investment portfolio activity, and holds quarterly meetings to discuss portfolio performance. PFMAM performs its duties in accordance with the City’s Investment Policy, which encompasses all deposits, investments and other assets of the City, including its subsidiaries and the Authority.

By using PFMAM, the Authority can take advantage of the preferential rates and fees applied to the City that are also generally only available to Asset Under Management (AUM) of a certain size. The cost for services on assets of similar size to the Authority would normally incur fees of at least 7.5 basis points, with a minimum annual fee of $40,000. However, under the City’s preferential rate, the minimum annual fee will be waived, and the cost for services will be a flat fee of 4.9 basis points City of Santa Clara Printed on 10/20/2023Page 2 of 5
powered by Legistar™
23-558 Agenda Date: 10/24/2023
(0.049%) of the portfolio. Therefore, staff recommends that the Authority is authorized to negotiate and execute an agreement with PFMAM for investment management services.

The proposed agreement with PFMAM has an initial term of five years, with the Authority having the sole discretion to exercise two additional one-year options or one two-year option to extend the term of the agreement. Based on the Renovation/Demolition Reserve’s initial fund size, expected growth, and ultimate maximum portfolio amount of $70 million, the maximum compensation during the initial term will not exceed $100,000. Actual investment earnings, depending on market conditions, are anticipated to cover the cost of the fees and provide for maximum returns when compared with funds currently deposited in the Stadium Authority’s general banking account.

Final terms and conditions of the agreement are currently being finalized with PFMAM. The draft form of the agreement is included as an attachment to this report.

Custodian Banking Services
Pursuant to City Code Section 2.105.140(c), a formal Statement of Qualifications (SOQ) was conducted as the solicitation method for this procurement, with the award recommendation based on “best value”. In April 2023, the Authority published the SOQ for Custodian Banking Services on the Authority’s e-procurement platform. Two proposals were received from the following firms:
· Principal Bank
· UMB Bank
Proposals were individually evaluated by a three-member team. Staff recommend awarding the agreement to Principal Bank for having submitted the best value proposal.

The agreement with Principal Bank has an initial term of five years, with the Authority having the sole discretion to exercise two one-year options or one two-year option which is still under negotiations.

Based on the Renovation/Demolition Reserve’s initial fund size, expected growth, and ultimate maximum portfolio amount of $70 million, the maximum compensation during the initial term will not exceed $75,000.

ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of a California Environmental Quality Act (“CEQA”) pursuant to the CEQA Guidelines section 15378(a) as it has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment. Furthermore, the action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15378(b)(5) in that it is a governmental organizational or administrative activity that will not result in direct or indirect changes in the environment.

FISCAL IMPACT
The term of Agreement with JPM is two-years with an option to extend the term up to five-years.

Banking fees related to JPM will not require a budget amendment as they will be replacing services currently provided by Bank of America and the related fees have been included in the FY 2023/24 Adopted Budget.

City of Santa Clara Printed on 10/20/2023Page 3 of 5
powered by Legistar™
23-558 Agenda Date: 10/24/2023
The term of Agreement with PFMAM is five-years with an option to extend the term for up to two additional years. For FY 2023/24, sufficient savings in the Stadium Authority General and Administrative budget to cover the $1,299 in projected fees incurred for investment management.

The necessary expenditure adjustments will be incorporated into future budgets.

The term of Agreement with Principal Bank is five-years with an option to extend the term for up to two additional years. For FY 2023/24, sufficient savings in the Stadium Authority General and Administrative budget to cover the additional $15,000 in annual fees for custodian services. The necessary expenditure adjustments will be incorporated into future budgets.

COORDINATION
This report has been coordinated with the Executive Director and Stadium Authority Counsel Office.

PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.

RECOMMENDATION

1. Authorize the Executive Director to (a) execute an agreement with JPMorgan Chase Bank for General Banking Services, for an initial two-year term ending on or around June 30, 2025, on substantially the terms and in the form presented; and (b) exercise one five-year option to extend the agreement through June 30, 2030 on the same terms, or with negotiated reasonable market rate adjustments in compensation, subject to the appropriation of funds;

2. Authorize the Executive Director to (a) execute an agreement with PFM Asset Management LLC for Investment Management Services for an initial five-year term ending on or around June 30, 2028, on substantially the terms and in the form presented, and (b) exercise one two-year option to extend the agreement through June 30, 2030 on the same terms, subject to the appropriation of funds;

3. Authorize the Executive Director to (a) execute an agreement with Principal Bank for Custodian Banking Services, for an initial five-year on substantially the terms and in the form presented, and (b) exercise two one-year options or one two-year option to extend the term of the agreement through September 30, 2029 or September 30, 2030, respectively, on the same terms, or with reasonable market rate adjustments in compensation, subject to the appropriation of funds;

4. Authorize the Executive Director to make minor amendments to each of the agreements to add or delete services as necessary to meet the Authority’s banking requirements, with proportionate changes in compensation, subject to the appropriation of funds; and

5. All such agreements, options and amendments shall be in final forms approved by Authority Counsel.

Reviewed by: Kenn Lee, Treasurer
Approved by: Jōvan D. Grogan, Executive Director
City of Santa Clara Printed on 10/20/2023Page 4 of 5
powered by Legistar™
23-558 Agenda Date: 10/24/2023

ATTACHMENTS

1. Proposed agreement with JP Morgan Chase Bank, N.A.

2. Proposed agreement with PFM Asset Management LLC

3. Proposed agreement with Principal Bank
City of Santa Clara Printed on 10/20/2023Page 5 of 5
powered by Legistar™

Agreement with JPMorgan Chase Bank, N.A. Page 1
Rev. 07-01-18
EBIX Insurance No. S200004548

AGREEMENT FOR SERVICES

BETWEEN THE

SANTA CLARA STADIUM AUTHORITY
AND
JPMORGAN CHASE BANK, N.A.

PREAMBLE
This Agreement is entered into between the Santa Clara Stadium Authority, a joint powers agency created pursuant to Section 6532 of the California Government Code (Authority) and JPMorgan Chase Bank, N.A., a national banking association, (Contractor). Authority and Contractor may be referred to individually as a “Party” or collectively as the “Parties” or the “Parties to this Agreement.”

RECITALS
A. Authority desires to secure the general banking services more fully described in this Agreement, at Exhibit A, entitled “Scope of Services”; B. Contractor represents that it, and its subcontractors, if any, have the professional qualifications, expertise, necessary licenses and desire to provide certain goods and/or required services of the quality and type which meet objectives and requirements of Authority specified herein; and,
C. The Parties have specified herein the terms and conditions under which such services will be provided and paid for.

The Parties agree as follows:

AGREEMENT TERMS AND CONDITIONS

1. AGREEMENT DOCUMENTS
The documents forming the entire Agreement between Authority and Contractor shall consist of these Terms and Conditions and the following Exhibits, which are hereby incorporated into this Agreement by this reference:

Exhibit A – Scope of Services (Service Group 1: General Banking) Exhibit B – Schedule of Fees
Exhibit C – Insurance Requirements
Exhibit D – Contractor’s Terms
This Agreement, including the Exhibits set forth above, contain s all the agreements, representations and understandings of the Parties, and supersedes

Agreement with JPMorgan Chase Bank, N.A. Page 2
Rev. 07-01-18
and replace s any previous agreements, representations and understandings, whether oral or written, between the Parties with respect to the services within the scope of this Agreement. In the event of any inconsistency between the provisions of any of the Exhibits and the Terms and Conditions , the Terms and Conditions shall govern and control. “Contractor’s Terms” means Contractor’s account terms, service terms and other documents required for the administration, implementation or operation of the Services, together with any addenda, schedules, supplements, and other attachments.

2. TERM OF AGREEMENT

Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on the Effective Date of this Agreement, which is the date that the final signatory executes the Agreement, for a term of two (2) years, with an option to extend the term of this Agreement for up to five (5) years, which option may be exercised at the sole discretion of the Authority, subject to Contractor’s consent which may be premised upon mutually acceptable adjustments to compensation and other terms and execution of an amendment to this Agreement or other mutually acceptable documentation. Exercise of option by Authority shall be requested in writing and served no less than 30 days prior to expiration of the initial five-year term, unless an alternative period is agreed to by both Parties, in accordance with Section 16 – “Notices.”

3. SCOPE OF SERVICES & PERFORMANCE SCHEDULE

Contractor shall perform those Services specified in Exhibit A within the time stated in Exhibit A. Time is of the essence. For the avoidance of doubt, the services to be performed under this Agreement do not include Merchant Card Services (Service Group 2), Purchasing Card / Integrated Payables (Service Group 3) or Institutional Custody (Service Group 4). Any reference to the RFP or Proposal in this Agreement will refer only to the terms therein that apply to Service Group 1: General Banking.

4. WARRANTY
Contractor expressly warrants that all materials and services covered by this Agreement shall conform to the specifications, requirements and instructions of the City of Santa Clara’s Request for Proposal #19-20-21 dated October 28, 2019 (the “RFP”) that apply to Service Group 1: General Banking, except as qualified or modified by Contractor’s Comprehensive Banking Services Technical Proposal dated December 6, 2019 (the “Proposal”) which is incorporated by reference. Contractor agrees to promptly replace or correct any incomplete, inaccurate or defective Services at no further cost to Authority when defects are due to the negligence, errors or omissions of Contractor. If Contractor fails to promptly correct or replace materials or services, Authority may make corrections or replace materials or services and Contractor shall refund any compensation

Agreement with JPMorgan Chase Bank, N.A. Page 3
Rev. 07-01-18
paid to Contractor under this Agreement for the materials or services that the Authority corrected or replaced.

5. QUALIFICATIONS OF CONTRACTOR - STANDARD OF CARE
Contractor represents and maintains that it has the expertise in the professional calling necessary to perform the Services, and its duties and obligations, expressed and binding upon Contractor under applicable law, contained herein, and Authority expressly relies upon Contractor’s representations regarding its skills and knowledge. Contractor shall perform such Services and duties in conformance to and consistent with the professional standards of a national banking association.

6. COMPENSATION AND PAYMENT

A. In consideration for Contractor’s complete performance of Services, Authority shall pay Contractor for all materials provided and Services rendered by Contractor in accordance with Exhibit B, entitled “SCHEDULE OF FEES.” Payment of fees by Authority and continued performance of the Services by Contractor under this Agreement is subject to Authority budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services. Authority shall notify Contractor if sufficient funds are not appropriated for Authority to make payment under this Agreement. Contractor is not obligated to perform, any services if sufficient funds have not been appropriated for payment of such services. Contractor shall invoice the Authority for all products and services rendered to the Authority on an ongoing basis in accordance with the rates and charges set forth in Exhibit B – SCHEDULE OF FEES, and Contractor shall not have the right to increase the rates and charges reflected on Exhibit B – SCHEDULE OF FEES during the initial Term of the Agreement. Any products or services not provided to the Authority on an ongoing basis shall be offered at the rates reflected on Exhibit B – SCHEDULE OF FEES and if not described therein at reasonable rates agreed to by both Parties.

B. Analysis Accounts. At the end of each monthly billing period, the Authority shall pay all service charges and charges for supplies reflected in the Account Analysis provided by Contractor and verified by the Authority, minus reductions for credits provided by Contractor to the Authority for compensating balances and Earnings Credit Allowance. Any unused Earnings Credit Allowance will not be carried forward to future billing periods.

C. The Authority shall be invoiced by Account Analysis and Contractor shall provide sufficient detail to allow the Authority to review and approve the

Agreement with JPMorgan Chase Bank, N.A. Page 4
Rev. 07-01-18
reconciled costs of services. The Account Analysis shall permit the breakout of charges or costs by account or account group to allow for separate billing options, at the option of the Authority. Final format of account groups, if any, shall be confirmed by the Authority’s Treasurer, or his/her designee.

D. The Account Analysis shall be available for Authority to review by the sixth (6th) banking day of each calendar month. On the fifteenth (15th) calendar day after the end of each monthly billing period, or the next banking day if the fifteenth (15th) falls on a weekend or a bank holiday, Contractor shall (a) apply the Authority’s earnings credit allowance against the fees and other compensation amounts reflected in the Account Analysis, less any disputed charges and (b) automatically debit from Authority’s predetermined account(s) (unless the Parties agree otherwise in writing) any undisputed fees and other compensation amounts that remain unpaid after Contractor applies the Earnings Credit Allowance for the billing period.

E. The Parties agree to resolve any disputed fees in good faith and Contractor may debit from the Authority’s predetermined account(s) any disputed charges the Authority has agreed to pay, immediately following resolution.

F. The Authority shall retain the right to dispute any fees paid for a period of six months following the date such fees are paid or automatically deducted from the Authority’s predetermined account(s).

G. The Authority will not honor any invoices or claims by Contractor that are tendered six months or later after the last item of the Agreement has expired.

7. TERMINATION
A. Termination for Convenience. Authority shall have the right to terminate this Agreement, without cause or penalty, by giving not less than Thirty (30) days’ prior written notice to Contractor.

B. Termination for Default. If Contractor fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided by law, Authority may terminate this Agreement immediately upon written notice to Contractor.

C. Upon termination, each Party shall assist the other in arranging an orderly transfer and close-out of services. As soon as possible following the notice of termination, but no later than ten (10) days after the notice of termination, Contractor will deliver to Authority all Authority information or material that Contractor has in its possession.

Agreement with JPMorgan Chase Bank, N.A. Page 5
Rev. 07-01-18

8. ASSIGNMENT AND SUBCONTRACTING

Authority and Contractor bind themselves, their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred without the prior written approval of Authority; provided, however, Contractor may assign this Agreement without Authority’s approval to a successor in interest in connection with a merger, reorganization, consolidation, or a disposition of a particular business to which this Agreement relates, and in the event of such an assignment, Contractor shall notify Authority as soon as reasonably practicable, and if Authority objects to such assignment, Authority may immediately terminate this Agreement without penalty. Contractor shall not hire subcontractors without express written permission from Authority. For all purposes under this Agreement, inclusive of all exhibits and attachments hereto, “subcontractor” and “subcontract” shall refer to a third party or an agreement with such third party, if any and as applicable, engaged by Contractor to specifically aid in the performance of its obligations under this Agreement, but shall not include any third party engaged by Contractor, from time to time, in the performance of certain operational, technological, incidental, or back office functions that assist Contractor in its performance of services, on a common basis, for all or most of its customers utilizing such services, such latter category of third parties being referred to as Third Party Service Providers. Contractor shall not be required to notify or obtain permission from Authority or any other party to engage a Third Party Service Provider.

Contractor shall be as fully responsible to Authority for the negligent acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as Contractor is responsible under this Agreement for the negligent acts and omissions of persons directly employed by it.

9. NO THIRD PARTY BENEFICIARY
This Agreement shall not be construed to be an agreement for the benefit of any third party or parties and no third party or parties shall have any claim or right of action under this Agreement for any cause whatsoever.

10. INDEPENDENT CONTRACTOR
Contractor and all person(s) employed by or contracted with Contractor to furnish labor and/or materials under this Agreement are independent contractors and do not act as agent(s) or employee(s) of Authority. Contractor has full rights to manage its employees in their performance of Services under this Agreement.

11. CONFIDENTIALITY OF MATERIAL
All ideas, memoranda, specifications, plans, manufacturing procedures, data, drawings, descriptions, documents, discussions or other information developed or received by or for Contractor and all other written information submitted to

Agreement with JPMorgan Chase Bank, N.A. Page 6
Rev. 07-01-18
Contractor in connection with the performance of this Agreement shall be held confidential by Contractor and shall not, without the prior written consent of Authority, be used for any purposes other than the performance of the Services or for audit, compliance, fraud mitigation or risk management purposes nor be disclosed to an entity to whom disclosure is not necessary for the foregoing purposes. Nothing furnished to Contractor which is otherwise known to Contractor or becomes generally known to the related industry shall be deemed confidential.

12. OWNERSHIP OF MATERIAL
[Intentionally deleted. Banking services are not provided on a work for hire basis.]

13. RIGHT OF AUTHORITY TO INSPECT RECORDS OF CONTRACTOR Authority, through its authorized employees, representatives or agents shall have the right during the term of this Agreement and for four (4) years from the date of final payment for goods or services provided under this Agreement, to audit the books and records of Contractor for the purpose of verifying any and all charges made by Contractor in connection with Contractor compensation under this Agreement, including termination of Contractor. Contractor agrees to maintain sufficient books and records in accordance with generally accepted accounting principles in its industry to establish the correctness of all charges submitted to Authority. Any expenses not so recorded shall be disallowed by Authority.

Authority shall reimburse Contractor for the reasonable cost of complying with any inspection, audit or review, unless the audit determines that there has been a substantial billing deviation in excess of five (5) percent adverse to the Authority, in which case Contractor shall not be entitled to such reimbursement and Authority may deduct the amount of excess fees paid by Authority from compensation due to Contractor under this Agreement, unless there is no compensation due (or the compensation due is less than these amounts) in which case such amounts may be charged directly to Contractor.

Notwithstanding anything to the contrary in this Agreement, Contractor’s maintenance, return, removal or destruction of any books or records is subject to Contractor’s standard record retention policy and retention periods established thereunder for each category of records. Nothing in this Agreement shall require Contractor to disclose or permit access to any examination reports, internal audit reports, records relating to other parties or personnel who are not responsible for overseeing Contractor’s performance of the Services, or any records that Contractor does not disclose to third parties in the ordinary course of its business. Further, any audit, examination, or review under this Agreement is: i) subject to Contractor’s receipt of a written request from Authority specifically describing the books or records required, ii) solely for the purpose of verifying Contractor’s compliance with the compensation and payment provisions of this Agreement and iii) subject to Contractor’s record retention policies. If Authority requires access to Contractor’s facilities, such access will be subject to

Agreement with JPMorgan Chase Bank, N.A. Page 7
Rev. 07-01-18
Contractor’s security procedures and Contractor may impose reasonable restrictions on the number of individuals allowed access, the frequency and length of access, and the areas accessed.

Contractor shall submit to Authority any and all reports concerning its performance under this Agreement that may be requested by Authority in writing.

Contractor agrees to assist Authority in meeting Authority’s reporting requirements to the State and other agencies with respect to Contractor’s Services hereunder. The type and content of the reports and the assistance provided shall be as mutually agreed upon by the Parties.

14. HOLD HARMLESS/INDEMNIFICATION
A. To the extent permitted by law, Contractor agrees to protect, defend, hold harmless and indemnify Authority, its City Council, commissions, officers, employees, volunteers and agents from and against any claim, injury, liability, loss, cost, and/or expense or damage, including all costs and attorney’s fees in providing a defense to any such claim or other action, and whether sounding in law, contract, tort, or equity, to the extent caused by Contractor’s negligence or willful misconduct in its performance ofi the Services pursuant to this Agreement – including claims of any kind by Contractor’s employees or persons contracting with Contractor to perform any portion of the Scope of Services. Notwithstanding the foregoing, (i) Contractor is not liable for any indirect, incidental, consequential, exemplary, punitive or special damages, including lost profits, regardless of the form of action or theory of recovery, even if Contractor has been advised of the possibility of those damages or the same are reasonably foreseeable; and (ii) Contractor’s indemnity obligations shall not exceed, in the aggregate, an amount equal to two times the average annual fees paid or payable to Contractor under the Agreement (exclusive of any earnings credits used to offset such fees).

B. Contractor’s obligation to protect, defend, indemnify, and hold harmless in full Authority and Authority’s employees, shall specifically extend to any and all employment-related claims of any type brought by employees, contractors, subcontractors or other agents of Contractor that perform any portion of the Scope of Services, against Authority (either alone, or jointly with Contractor), in connection with this agreement, regardless of venue/jurisdiction in which the claim is brought and the manner of relief sought.

C. To the extent Contractor is obligated to provide health insurance coverage to its employees pursuant to the Affordable Care Act (“Act”) and/or any other similar federal or state law, Contractor warrants that it is meeting its obligations under the Act and will fully indemnify and hold harmless Authority for any penalties, fines, adverse rulings, or tax payments associated with Contractor’s responsibilities under the Act.

Agreement with JPMorgan Chase Bank, N.A. Page 8
Rev. 07-01-18

15. INSURANCE REQUIREMENTS
During the term of this Agreement, and for any time period set forth in Exhibit C, Contractor shall provide and maintain in full force and effect, at no cost to Authority, insurance policies as set forth in Exhibit C.

16. WAIVER
Contractor agrees that waiver by Authority of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Neither Authority’s review, acceptance nor payments for any of the Services required under this Agreement shall be constructed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.

17. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to Authority addressed as follows:

Santa Clara Stadium Authority
Attention: Executive Director
1500 Warburton Avenue
Santa Clara, CA 95050
and by e-mail at [email protected]

And to Contractor addressed as follows:

JPMorgan Chase Bank, N.A.

Attn: Neil Pack or CB Gov’t Industry Manager
560 Mission St, 20th Floor, Mail Code: CA1-0401
San Francisco, CA 94105-2907
and by e-mail at [email protected]

The workday the e-mail was sent shall control the date notice was deemed given. An e-mail transmitted after 2:00 p.m. Pacific Time on a Friday shall be deemed to have been transmitted on the following business day.

18. COMPLIANCE WITH LAWS
To the extent binding upon Contractor in its performance of the Services, Contractor shall comply with all applicable laws and regulations of the federal, state and local government, including but not limited to “The Code of the City of Santa Clara, California” (“SCCC”). In particular, Contractor’s attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Certificate (SCCC section 3.40.060), and Food and Beverage

Agreement with JPMorgan Chase Bank, N.A. Page 9
Rev. 07-01-18
Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally Contractor has read and agrees to comply with City’s Ethical Standards (http://santaclaraca.gov/home/showdocument?id=58299).

To the extent that the charter, ordinances, rules and regulations of Authority currently, or in the future, impose obligations upon Authority’s contractors that provide services contemplated in this Agreement, which are not expressly set forth in this Agreement, Contractor will, if notified of such requirements, endeavor to comply with the same, except to the extent that it reasonably concludes that compliance with such requirements subject it to additional obligations, liability or expense or impose upon it reporting requirements of confidential or non-public information or information that it does not currently monitor or disclose to third parties. If Contractor makes such determination, and the parties are unable to resolve these issues through mutually agreeable amendments to this Agreement, either party may terminate this Agreement without penalty upon notice to the other.

19. CONFLICTS OF INTEREST
Contractor certifies that to the best of its knowledge, no Authority officer, employee or authorized representative has any financial interest in the business of Contractor and that no person associated with Contractor has any interest, direct or indirect, which could conflict with the faithful performance of this Agreement. Contractor is familiar with the provisions of California Government Code section 87100 and following, and certifies that it does not know of any facts which would violate these code provisions. Contractor will advise Authority if a conflict arises. For the avoidance of doubt, Contractor does not consider ownership interests in its holding company, JPMorgan Chase & Co., or any of its publicly traded affiliates to constitute an interest for the purpose of the foregoing certification. Mere ownership of interests in such publicly traded companies does not entitle a shareholder to manage or participate in Contractor’s business.

20. FAIR EMPLOYMENT
Contractor shall not discriminate against any employee or applicant for employment because of race, sex, color, religion, religious creed, national origin, ancestry, age, gender, marital status, physical disability, mental disability, medical condition, genetic information, sexual orientation, gender expression, gender identity, military and veteran status, or ethnic background, in violation of federal, state or local law.

21. NO USE OF AUTHORITY NAME OR EMBLEM
Contractor shall not use Authority’s name, insignia, or emblem, or distribute any information related to services under this Agreement in any magazine, trade paper, newspaper or other medium without express written consent of Authority.

Agreement with JPMorgan Chase Bank, N.A. Page 10
Rev. 07-01-18

22. GOVERNING LAW AND VENUE
This Agreement shall be governed and construed in accordance with the statutes and laws of the State of California, except to the extent such state law is pre- empted by Federal law, in which case Federal law shall govern. The venue of any suit filed by either Party shall be vested in the state courts of the County of Santa Clara, or if appropriate, in the United States District Court, Northern District of California, San Jose, California.

23. SEVERABILITY CLAUSE
In case any one or more of the provisions in this Agreement shall, for any reason, be held invalid, illegal or unenforceable in any respect, it shall not affect the validity of the other provisions, which shall remain in full force and effect.

24. AMENDMENTS
This Agreement may only be modified by a written amendment duly authorized and executed by the Parties to this Agreement.

25. COUNTERPARTS
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.

The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives.

Agreement with JPMorgan Chase Bank, N.A. /Exhibit A-Scope of Services Page 1 Rev. 07-01-18

SANTA CLARA STADIUM AUTHORITY
a California Joint Powers Authority

Approved as to Form: Dated:

GLEN R. GOOGINS
Stadium Authority Counsel
Executive Director
Santa Clara Stadium Authority
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
“AUTHORITY”

JPMORGAN CHASE BANK, N.A.
a national banking association

Dated:

By (Signature):

Name: Neil Pack
Title: Executive Director
Principal Place of
Business Address:
560 Mission St., 20th Floor
San Francisco, CA 94105
Email Address: [email protected]
Telephone: (415)315-8838
Fax: ( )
“CONTRACTOR”

Agreement with JPMorgan Chase Bank, N.A. /Exhibit A-Scope of Services Page 2 Rev. 07-01-18

EXHIBIT A

SCOPE OF SERVICES
(Service Group 1: General Banking)
The Services to be performed for the Authority by the Contractor under this Agreement are those services described in the provisions of the Proposal that apply to Service Group 1: General Banking.

Agreement with JPMorgan Chase Bank, N.A. /Exhibit B-Schedule of Fees Page 1 Rev. 07-01-18

EXHIBIT B

SCHEDULE OF FEES
Contractor will bill Authority on a monthly basis for Services provided by Contractor during the preceding month as described in the Agreement at the rates and charges provided herein.

[JPM banking team to attach pricing schedule

Agreement with JPMorgan Chase Bank, N.A. /Exhibit C-Insurance Requirements Page 1 Rev. 07-01-18

EXHIBIT C

INSURANCE REQUIREMENTS
Prior to commencing any
of the Services required under this Agreement, the Contractor shall provide and maintain in full force and effect during the period of performance of the Agreement and for twenty-four (24) months following acceptance by the Authority, at its sole cost and expense, the following insurance policies from insurance companies authorized and permittedto do business in the State of
California. Where applicable, These policies shall be primary insurance as to the Santa Clara Stadium Authority so that any other coverage held by the Authority shall not contribute to any loss under Contractor’s
insurance. The minimum coverages, provisions and endorsements are as follows:

A. COMMERCIAL GENERAL LIABILITY INSURANCE

Commercial General Liability Insurance policy which provides coverage at least as broad as Insurance Services Office form CG 00 01 or equivalent. Policy limits are subject to
review, but shall in no event be less than, the following:

$2,000,000 Each Occurrence
$4,000,000 General Aggregate
$2,000,000 Products/Completed Operations Aggregate
$1,000,000 Personal Injury

Exact structure and layering of the coverage shall be left to the discretion of Contractor; however, any excess or umbrella policies used to meet the required limits shall be no less broader as the underlying coverage and shall otherwise follow form.

The following provisions shall apply to the Commercial Liability policy as well as any umbrella policy maintained by the Contractor to comply with the insurance requirements of this Agreement:

Coverage shall be on a “pay on behalf” basis with defense costs payable in addition to policy limits;

There shall be no cross liability exclusion which precludes coverage for claims or suits by one insured against another; and

Coverage shall apply separately to each insured against whom a claim is made or a suit is brought, except with respect to the limits of liability.

B. BUSINESS AUTOMOBILE LIABILITY INSURANCE

Business automobile liability insurance policy which provides coverage at least as

Agreement with JPMorgan Chase Bank, N.A. /Exhibit C-Insurance Requirements Page 2 Rev. 07-01-18
broad as ISO form CA 00 01 or equivalent with policy limits a minimum limit of not less than one
million dollars ($1,000,000) combined single limit each accident using, or providing coverage at least as
broad as, Insurance Services Office form CA 00 01. Liability coverage shall apply to all owned (if any), non-owned and hired autos.

In the event that the Work being performed under this Agreement involves transporting of hazardous or regulated substances, hazardous or regulated wastes and/or hazardous or regulated materials, Contractor and/or its subcontractors involved in such activities shall provide coverage with a limit of one million dollars ($1,000,000) per accident covering transportation of such materials by the addition to the Business Auto Coverage Policy of Environmental Impairment Endorsement MCS90 or Insurance Services Office endorsement form CA 99 48, which amends the pollution exclusion in the standard Business Automobile Policy to cover pollutants that are in or upon, being transported or towed by, being loaded onto, or being unloaded from a covered auto.

C. WORKERS’ COMPENSATION

Workers’ Compensation Insurance Policy as required by statute and employer’s liability with limits of at least one million dollars ($1,000,000) policy limit Bodily Injury by disease, one million dollars ($1,000,000) each accident/Bodily Injury and one million dollars ($1,000,000) each employee Bodily Injury by disease.

The indemnification and hold harmless obligations of Contractor included in this Agreement shall not be limited in any way by any limitation on the amount or type of damage, compensation or benefit payable by or for Contractor or any subcontractor under any Workers’ Compensation Act(s), Disability Benefits Act(s) or other employee benefits act(s).

This policy must include a Waiver of Subrogation in favor of the Santa Clara Stadium Authority, its governing board, subordinate boards, officers, employees, and agents.

D. PROFESSIONAL LIABILITY

Bankers Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against negligent acts, errors or omissions of the Contractor. Covered services as designated in the policy must specifically include work performed under this agreement. Coverage shall be in an amount of not less than one hundred twenty-five million dollars ($125,000,000) per wrongful act and in aggregate. .

E. COMPLIANCE WITH REQUIREMENTS

All of the following clauses and/or endorsements, or similar provisions, must be part of each commercial general liability policy, and each umbrella or excess policy.

Additional Insureds. The Santa Clara Stadium Authority, its governing board, subordinate boards, officers, employees, and agents (“Indemnified Parties”) are hereby

Agreement with JPMorgan Chase Bank, N.A. /Exhibit C-Insurance Requirements Page 3 Rev. 07-01-18
added as additional insureds in respect to liability arising out of Contractor’s work for Authority, using Insurance Services Office (ISO) Endorsement CG 20 10 11 85, or the combination of CG 20 10 03 97 and CG 20 37 10 01, or its equivalent.

Primary and non-contributing. Each insurance policy provided by Contractor shall contain language or be endorsed to contain wording making it primary insurance as respects to, and not requiring contribution from, any other insurance which the Indemnified Parties may possess, including any self-insurance or self-insured retention they may have. Any other insurance that the Indemnified Parties may possess shall be considered excess insurance only and shall not be called upon to contribute with Contractor’s insurance.

Cancellation.

Contractor shall endeavor to send notice if limits fall below the minimum requirement of this agreement.
.

Other Endorsements. Other endorsements may be required for policies other than the commercial general liability policy if specified in the description of required insurance set forth in Sections A through E of this Exhibit C, above.

F. ADDITIONAL INSURANCE RELATED PROVISIONS

Contractor and Authority agree as follows:

Contractor agrees to ensure that subcontractors, and any other party involved with the Services, who is brought onto or involved in the performance of the Services by Contractor, provide the same or similar minimum insurance coverage required of Contractor,
except as with respect to limits. Contractor agrees to monitor and review all such coverage and ensuring that such coverage is
provided in conformity with the requirements of this Agreement. Contractor agrees that upon request by Authority, all agreements with, and insurance compliance documents provided by, such subcontractors and others engaged in the project will be submitted to Authority for review.

Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge Authority or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to Authority. It is not the intent of Authority to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against Authority for payment of premiums or other amounts with respect thereto.

The Authority reserves the right to withhold payments from the Contractor in the event of material noncompliance with the insurance requirements set forth in this Agreement.

G. EVIDENCE OF COVERAGE

Agreement with JPMorgan Chase Bank, N.A. /Exhibit C-Insurance Requirements Page 4 Rev. 07-01-18
Prior to commencement of any Services under this Agreement, Contractor, and each and every subcontractor (of every tier) shall, at its sole cost and expense, provide and maintain not less than the minimum insurance coverage with the endorsements indicated in this Agreement. Such insurance coverage shall be maintained with insurers, and under forms of policies, satisfactory to Authority and as described in this Agreement. Contractor shall file with the Authority all certificates and endorsements for the required insurance policies for Authority’s approval as to adequacy of the insurance protection.

H. EVIDENCE OF COMPLIANCE

Contractor or its insurance broker shall provide the required proof of insurance compliance, consisting of Insurance Services Office (ISO) endorsement forms or their equivalent and the ACORD form 25-S certificate of insurance (or its equivalent), evidencing all required coverage shall be delivered to Authority, or its representative as set forth below, at or prior to execution of this Agreement. . Unless otherwise required by the terms of this Agreement, all certificates, endorsements, coverage verifications and other items required to be delivered to Authority pursuant to this Agreement shall be mailed to:

EBIX Inc.

Santa Clara Stadium Authority or 1 Ebix Way
P.O. Box 100085 – S2 John’s Creek, GA 30097
Duluth, GA 30096
Telephone number: 951-766-2280
Fax number: 770-325-0409
Email address: [email protected]

I. QUALIFYING INSURERS

All of the insurance companies providing insurance for Contractor shall have, and provide written proof of, an A. M. Best rating of at least A minus 6 (A- VI) or shall be an insurance company of equal financial stability that is approved by the Authority or its insurance compliance representatives.

Agreement with JPMorgan Chase Bank, N.A. /Exhibit D-Contractor’s Terms Page 1 Rev. 07-01-18

EXHIBIT D
CONTRACTOR’S TERMS
[JPM banking team to attach]

Agreement with PFM Asset Management Page 1 of 19
Rev. 07-01-18
EBIX Insurance No. *S200005144

AGREEMENT FOR SERVICES

BETWEEN THE

SANTA CLARA STADIUM AUTHORITY
AND

PFM ASSET MANAGEMENT LLC

PREAMBLE
This Agreement is entered into between the Santa Clara Stadium Authority, a joint powers agency created pursuant to Section 6532 of the California Government Code (Authority) and PFM Asset Management LLC, a Delaware limited liability company (Contractor). Authority and Contractor may be referred to individually as a “Party” or collectively as the “Parties” or the “Parties to this Agreement.”

RECITALS
A. Authority desires to secure the services more fully described in this Agreement, at Exhibit A, entitled “Scope of Services”;
B. Contractor represents that it, and its subcontractors, if any, have the professional qualifications, expertise, necessary licenses and desire to provide certain goods and/or required services of the quality and type which meet objectives and requirements of Authority; and,
C. The Parties have specified herein the terms and conditions under which such services will be provided and paid for.

The Parties agree as follows:

AGREEMENT TERMS AND CONDITIONS

1. AGREEMENT DOCUMENTS
The documents forming the entire Agreement between Authority and Contractor shall consist of these Terms and Conditions and the following Exhibits, which are hereby incorporated into this Agreement by this reference:

Exhibit A – Scope of Services
Exhibit B – Schedule of Fees
Exhibit C – Insurance Requirements
This Agreement, including the Exhibits set forth above, contains all the agreements, representations and understandings of the Parties, and supersedes

Agreement with PFM Asset Management Page 2 of 19
Rev. 07-01-18
and replaces any previous agreements, representations and understandings, whether oral or written. In the event of any inconsistency between the provisions of any of the Exhibits and the Terms and Conditions, the Terms and Conditions shall govern and control.

2. TERM OF AGREEMENT
Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on July 1, 2023 and terminate on June 30, 2028 (Initial Term). The Authority reserves the right, at its own sole discretion, to extend the term of this Agreement for up to two (2) additional one-year options or one (1) additional two-year option through June 30, 2030.

3. SCOPE OF SERVICES & PERFORMANCE SCHEDULE
Contractor shall perform those Services specified in Exhibit A within the time stated in Exhibit A. Time is of the essence.

4. WARRANTY
Contractor expressly warrants that all materials and services covered by this Agreement shall be performed with the degree of skill and care in accordance with industry standards, requirements and instructions upon which this Agreement is based. Contractor agrees to promptly replace or correct any incomplete, inaccurate or defective Services at no further cost to Authority when defects are due to the negligence, errors or omissions of Contractor. If Contractor fails to promptly correct or replace materials or services, Authority may make corrections or replace materials or services and charge Contractor for the cost incurred by Authority.

5. QUALIFICATIONS OF CONTRACTOR - STANDARD OF CARE
Contractor represents and maintains that it has the expertise in the professional calling necessary to perform the Services, and its duties and obligations, expressed and implied, contained herein, and Authority expressly relies upon Contractor’s representations regarding its skills and knowledge. Contractor shall perform such Services and duties in conformance to and consistent with the professional standards of a specialist in the same discipline in the State of California.

6. CONFLICT OF INTEREST (FORM 700)
In accordance with the California Political Reform Act (Government Code section 81000 et seq.) and the Authority’s Conflict of Interest Code, Contractor shall cause each person who will be principally responsible for providing the service and deliverables under this Agreement as having to file a Form 700 to do each of the following:

Agreement with PFM Asset Management Page 3 of 19
Rev. 07-01-18
A. Complete and file the Form 700 no later than thirty (30) calendar days after the date the person begins performing services under the Agreement and all subsequent Form 700s in conformance with the requirements specified in the California Political Reform Act; and
B. File the Form 700 with the Santa Clara City’s Clerk Office.

7. COMPENSATION AND PAYMENT
In consideration for Contractor’s complete performance of Services, Authority shall pay Contractor for all materials provided and Services rendered by Contractor in accordance with Exhibit B, entitled “SCHEDULE OF FEES.” The maximum compensation of this Agreement is One Hundred Thousand Dollars ($100,000) during the Initial Term, subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services. All work performed or materials provided in excess of the maximum compensation shall be at Contractor’s expense. Contractor shall not be entitled to any payment above the maximum compensation unless permitted in an Amendment to the Agreement.

8. TERMINATION
A. Termination for Convenience. Authority shall have the right to terminate this Agreement, without cause or penalty, by giving not less than Thirty (30) days’ prior written notice to Contractor.

B. Termination for Default. Either Party may terminate this Agreement upon written notice to the other Party, if the other Party breaches a material term of this Agreement and such breach remains uncured for thirty (30) days after the other Party’s receipt of such notice.

C. Upon termination, each Party shall assist the other in arranging an orderly transfer and close-out of services. As soon as possible following the notice of termination, but no later than ten (10) days after the notice of termination, Contractor will deliver to Authority all Authority information or material that Contractor has in its possession.

9. ASSIGNMENT AND SUBCONTRACTING
Authority and Contractor bind themselves, their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred without the prior written approval of Authority. Contractor shall not hire subcontractors without express written permission from Authority.

Contractor shall be as fully responsible to Authority for the acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as Contractor is for the acts and omissions of persons directly employed by it.

Agreement with PFM Asset Management Page 4 of 19
Rev. 07-01-18

10. NO THIRD PARTY BENEFICIARY
This Agreement shall not be construed to be an agreement for the benefit of any third party or parties and no third party or parties shall have any claim or right of action under this Agreement for any cause whatsoever.

11. INDEPENDENT CONTRACTOR
Contractor and all person(s) employed by or contracted with Contractor to furnish labor and/or materials under this Agreement are independent contractors and do not act as agent(s) (except with respect to the purchase and sale of portfolio securities managed by Contractor) or employee(s) of Authority. Contractor has full rights to manage its employees in their performance of Services under this Agreement.

12. CONFIDENTIALITY OF MATERIAL
All ideas, memoranda, specifications, plans, manufacturing procedures, data, drawings, descriptions, documents, discussions or other information developed or received by or for Contractor and all other written information submitted to Contractor in connection with the performance of this Agreement shall be held confidential by Contractor and shall not, without the prior written consent of Authority or unless required by law or judicial or regulatory process, be used for any purposes other than the performance of the Services nor be disclosed to an entity not connected with performance of the Services. Nothing furnished to Contractor which is otherwise known to Contractor or becomes generally known to the related industry shall be deemed confidential.

13. OWNERSHIP OF MATERIAL
All material, which shall include, but not be limited to, data, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports, designs, technology, programming, works of authorship and other material developed, collected, prepared or caused to be prepared under this Agreement shall be the property of Authority but Contractor may retain and use copies thereof. Authority shall not be limited in any way or at any time in its use of said material. However, Contractor shall not be responsible for damages resulting from the use of said material for work other than Project, including, but not limited to, the release of this material to third parties.

14. RIGHT OF AUTHORITY TO INSPECT RECORDS OF CONTRACTOR Authority, through its authorized employees, representatives or agents shall, upon reasonable advance notice, have the right during the term of this Agreement and for four (4) years from the date of final payment for goods or services provided under this Agreement, to audit the books and records of Contractor for the purpose of verifying any and all charges made by Contractor in

Agreement with PFM Asset Management Page 5 of 19
Rev. 07-01-18
connection with Contractor compensation under this Agreement, including termination of Contractor. Contractor agrees to maintain sufficient books and records in accordance with generally accepted accounting principles to establish the correctness of all charges submitted to Authority. Any expenses not so recorded shall be disallowed by Authority. Contractor shall bear the cost of the audit if the audit determines that there has been a substantial billing deviation in excess of five (5) percent adverse to the Authority.

Contractor shall submit to Authority any and all reports concerning its performance under this Agreement that may be requested by Authority in writing.

Contractor agrees to assist Authority in meeting Authority’s reporting requirements to the State and other agencies with respect to Contractor’s Services hereunder.

15. HOLD HARMLESS/INDEMNIFICATION
A. To the extent permitted by law, Contractor agrees to protect, defend, hold harmless and indemnify Authority, its City Council, commissions, officers, employees, volunteers and agents from and against any claim, injury, liability, loss, cost, and/or expense or damage, including all costs and attorney’s fees in providing a defense to any such claim or other action, and whether sounding in law, contract, tort, or equity, in any manner arising from, or alleged to arise in whole or in part from, or in any way connected with the Services negligently or intentionally wrongfully performed by Contractor pursuant to this Agreement – including claims of any kind by Contractor’s employees or persons contracting with Contractor to perform any portion of the Scope of Services – and shall expressly include passive or active negligence by City connected with the Services. However, the obligation to indemnify shall not apply if such liability is ultimately adjudicated to have arisen through the sole active negligence or sole willful misconduct of City; the obligation to defend is not similarly limited.

B. Contractor’s obligation to protect, defend, indemnify, and hold harmless in full Authority and Authority’s employees, shall specifically extend to any and all employment-related claims of any type brought by employees, contractors, subcontractors or other agents of Contractor, against Authority (either alone, or jointly with Contractor), in connection with this Agreement, regardless of venue/jurisdiction in which the claim is brought and the manner of relief sought.

C. To the extent Contractor is obligated to provide health insurance coverage to its employees pursuant to the Affordable Care Act (“Act”) and/or any other similar federal or state law, Contractor warrants that it is meeting its obligations under the Act and will fully indemnify and hold harmless Authority for any penalties, fines, adverse rulings, or tax payments associated with Contractor’s responsibilities under the Act.

Agreement with PFM Asset Management Page 6 of 19
Rev. 07-01-18

16. INSURANCE REQUIREMENTS
During the term of this Agreement, and for any time period set forth in Exhibit C, Contractor shall maintain in full force and effect, at no cost to Authority, insurance policies as set forth in Exhibit C.

17. WAIVER
Contractor agrees that waiver by Authority of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Neither Authority’s review, acceptance nor payments for any of the Services required under this Agreement shall be constructed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.

18. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to Authority addressed as follows:

Santa Clara Stadium Authority
Attention: Executive Director
1500 Warburton Avenue
Santa Clara, CA 95050
and by e-mail at [email protected]

And to Contractor addressed as follows:

PFM Asset Management LLC
Attention: Monique Spyke, Managing Director
1 California Street
Suite 1000
San Francisco, CA 94111
and by e-mail at [email protected]

with a copy to:

PFM Asset Management LLC
Attention: Chief Administrative Officer
213 Market Street
Harrisburg, PA 17101
and by email at [email protected]

The workday the e-mail was sent shall control the date notice was deemed given.

An e-mail transmitted after 2:00 p.m. on a Friday shall be deemed to have been transmitted on the following business day.

Agreement with PFM Asset Management Page 7 of 19
Rev. 07-01-18

19. COMPLIANCE WITH LAWS
Contractor shall comply with all applicable laws and regulations of the federal, state and local government, including but not limited to “The Code of the City of Santa Clara, California” (“SCCC”). In particular, Contractor’s attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Certificate (SCCC section 3.40.060), and Food and Beverage Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally Contractor has read and agrees to comply with City’s Ethical Standards (http://santaclaraca.gov/home/showdocument?id=58299).

20. CONFLICTS OF INTEREST
Contractor certifies that to the best of its knowledge, no Authority officer, employee or authorized representative has any financial interest in the business of Contractor and that no person associated with Contractor has any interest, direct or indirect, which could conflict with the faithful performance of this Agreement. Contractor is familiar with the provisions of California Government Code section 87100 and following, and certifies that it does not know of any facts which would violate these code provisions. Contractor will advise Authority if a conflict arises.

21. FAIR EMPLOYMENT
Contractor shall not discriminate against any employee or applicant for employment because of race, sex, color, religion, religious creed, national origin, ancestry, age, gender, marital status, physical disability, mental disability, medical condition, genetic information, sexual orientation, gender expression, gender identity, military and veteran status, or ethnic background, in violation of federal, state or local law.

22. NO USE OF AUTHORITY NAME OR EMBLEM
Contractor shall not use Authority’s name, insignia, or emblem, or distribute any information related to services under this Agreement in any magazine, trade paper, newspaper or other medium without express written consent of Authority.

23. GOVERNING LAW AND VENUE
This Agreement shall be governed and construed in accordance with the statutes and laws of the State of California, except to the extent such state law is pre- empted by Federal law, in which case Federal law shall govern. The venue of any suit filed by either Party shall be vested in the state courts of the County of Santa Clara, or if appropriate, in the United States District Court, Northern District of California, San Jose, California.

Agreement with PFM Asset Management Page 8 of 19
Rev. 07-01-18

24. SEVERABILITY CLAUSE
In case any one or more of the provisions in this Agreement shall, for any reason, be held invalid, illegal or unenforceable in any respect, it shall not affect the validity of the other provisions, which shall remain in full force and effect.

25. AMENDMENTS
This Agreement may only be modified by a written amendment duly authorized and executed by the Parties to this Agreement.

26. COUNTERPARTS
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.

The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives.

27. INVESTMENT ADVISOR PROVISIONS
A. Services of Contractor. Authority hereby engages Contractor to serve as investment manager under the terms of this Agreement with respect to the funds described in Exhibit A, Section 1 to this Agreement and such other funds as Authority may from time to time assign by written notice to Contractor (collectively the "Managed Funds"), and Contractor accepts such appointment. In connection therewith, Contractor will be a fiduciary to the Authority and provide investment research and management of the Managed Funds investments and conduct a continuous program of investment, evaluation and, when appropriate, sale and reinvestment of the Managed Funds assets. Contractor shall continuously monitor investment opportunities, evaluate investments of the Managed Funds, and invest Managed Funds in accordance with Federal and State law and the ’s Investment Policy, as amended from time to time. Contractor shall furnish Authority with statistical information and reports with respect to investments of the Managed Funds. Contractor shall place all orders for the purchase, sale, loan or exchange of portfolio securities for Authority's account with brokers or dealers recommended by Contractor and/or Authority, and to that end Contractor is authorized as agent of Authority to give instructions to the custodian designated by Authority (the “Custodian”) as to deliveries of securities and payments of cash for the account of Authority. In connection with the selection of such brokers and dealers and the placing of such orders, Contractor is directed to seek for Authority the most favorable execution and price., The Custodian shall have custody of cash, assets and securities of Authority. Contractor shall not take possession of or act as custodian for the cash, securities or other assets of Authority and shall have no responsibility in connection

Agreement with PFM Asset Management Page 9 of 19
Rev. 07-01-18
therewith. Authorized investments shall include only those investments which are currently authorized by the state investment statutes and the applicable covenants and as supplemented by such other written instructions, including the ’s Investment Policy, as may from time to time be provided by Authority to Contractor. Contractor shall be entitled to rely upon Authority's written advice with respect to anticipated drawdowns of Managed Funds. Contractor will observe the instructions of Authority with respect to broker/dealers who are approved to execute transactions involving the Managed Funds and in the absence of such instructions will engage broker/dealers which Contractor reasonably believes to be reputable, qualified and financially sound.

B. Pool Compensation. Assets invested by Contractor under the terms of this Agreement may from time to time be invested in (i) a money market mutual fund managed by an affiliate of Contractor or (ii) a local government investment pool managed by Contractor (either, a “Pool”) or in individual securities. Approval for Contractor to invest Managed Funds in accordance with this subsection must be specifically allowed in the Authority’s Investment Policy and expressly approved in writing by the Authority. Average daily net assets subject to the fees described in this Agreement shall not take into account any funds invested in the Pool.

Expenses of the Pool, including compensation for Contractor or its affiliate, as applicable, and the Pool custodian, are described in the relevant prospectus or information statement and are paid from the Pool.

C. Other Compensation. If and to the extent that Authority shall request Contractor to render services other than those to be rendered by Contractor under this Agreement, such additional services shall be compensated separately on terms to be agreed to in writing between Contractor and Authority.

D. Expenses. Contractor shall furnish at its own expense all necessary administrative services, office space, equipment, clerical personnel, telephone and other communication facilities, courier or other delivery services, printing, subscription services, computer and technology, investment advisory facilities, executive and supervisory personnel, and all other equipment and services customarily required for managing the Managed Funds. Except as expressly provided otherwise herein, Authority shall pay all of its own expenses including, without limitation, taxes, commissions, fees and expenses of Authority's independent auditors and legal counsel, if any, brokerage and other expenses connected with the execution of portfolio security transactions, insurance premiums, and fees and expenses of the Custodian.

E. Registered Advisor; Duty of Care. Contractor hereby represents it is a registered investment advisor under the Investment Advisers Act of 1940.

Contractor shall immediately notify Authority if at any time during the term

Agreement with PFM Asset Management Page 10 of 19
Rev. 07-01-18
of this Agreement it is not so registered or if its registration is suspended.

Contractor agrees to perform its duties and responsibilities under this Agreement with reasonable care. The federal securities laws impose liabilities under certain circumstances on persons who act in good faith.

Nothing herein shall in any way constitute a waiver or limitation of any rights which Authority may have under any federal securities laws.

Authority hereby authorizes Contractor to sign I.R.S. Form W-9 on behalf of Authority and to deliver such form to broker-dealers or others from time to time as required in connection with securities transactions pursuant to this Agreement.

F. Contractor’s Other Clients. Authority understands that Contractor performs investment advisory services for various other clients which may include investment companies, commingled trust funds and/or individual portfolios. Authority agrees that Contractor, in the exercise of its professional judgment, may give advice or take action with respect to any of its other clients which may differ from advice given or the timing or nature of action taken with respect to the Managed Funds. Contractor shall not have any obligation to purchase, sell or exchange any security for the Managed Funds solely by reason of the fact that Contractor, its principals, affiliates, or employees may purchase, sell or exchange such security for the account of any other client or for itself or its own accounts.

G. Force Majeure. Contractor shall have no liability for any losses arising out of the delays in performing or inability to perform the services which it renders under this Agreement which result from events beyond its control, including interruption of the business activities of Contractor or other financial institutions due to acts of God, pandemic, “superhuman cause,” acts of governmental authority, acts of war, terrorism, civil insurrection, riots, labor difficulties, or any action or inaction of any carrier or utility, or mechanical or other malfunction.

H. Disciplinary Actions. Contractor shall promptly give notice to Authority if Contractor shall have been found to have violated any state or federal securities law or regulation in any final and unappealable judgment in any criminal action or civil suit in any state or federal court or in any disciplinary proceeding before the Securities and Exchange Commission (“SEC”) or any other agency or department of the United States, any registered securities exchange, FINRA, or any regulatory authority of any State based upon the performance of services as an investment advisor.

I. Books. Contractor shall maintain records of all transactions in the Managed Funds. Contractor shall provide Authority with a monthly statement showing deposits, withdrawals, purchases and sales (or maturities) of investments, earnings received, and the value of assets held on the last business day of the month. The statement shall be in the format and manner that is mutually agreed upon by Contractor and

Agreement with PFM Asset Management Page 11 of 19
Rev. 07-01-18
Authority. Other reporting requirements and electronic access to the Authority’s account shall be provided by the Contractor as described in Exhibit A – Scope of Services or as reasonably requested by the Authority.

J. Brochure and Brochure Supplement. Contractor warrants that it has delivered to Authority prior to the execution of this Agreement Contractor's current SEC Form ADV, Part 2A (brochure) and Part 2B (brochure supplement). Authority acknowledges receipt of such brochure and brochure supplement prior to the execution of this Agreement.

The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives.

SANTA CLARA STADIUM AUTHORITY
a California Joint Powers Authority

Approved as to Form: Dated:

GLEN R. GOOGINS
Stadium Authority Counsel

JOVAN D. GROGAN
Executive Director
Santa Clara Stadium Authority
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
“AUTHORITY”

PFM ASSET MANAGEMENT LLC
a Delaware limited liability company

Dated:

By (Signature):

Name: Monique Spyke
Title: Managing Director
Principal Place of
Business Address:
1 California Street
Suite 1000
San Francisco, CA 94111
Email Address: [email protected]
Telephone: (415) 393-7259
Fax: -
“CONTRACTOR”

Agreement with PFM Asset Management /Exhibit A-Scope of Services Page 12 of 19 Rev. 07-01-18

EXHIBIT A

SCOPE OF SERVICES

1. GENERAL
The Authority has several reserve funds (i.e. Operating Reserve, Capital Expenditure Reserve and Renovation/Demolition Reserve) that it manages internally. The reserves are expected to grow significantly within the next five years since there will be additional excess revenues going into the reserves. The Authority wishes to pool all the reserves together to invest its monies and have it managed by an investment manager. Under this Agreement, the Authority designates and retains Contractor to furnish investment advisory and portfolio management services for the Authority’s portfolio.

2. SCOPE OF SERVICES
The services that Contractor shall perform include, but are not limited to, the following:

2.1. Provide full-time investment management services in accordance with the Investment Policy and State law.

2.2. Assist with recommending an investment program, within the Investment Policy, in accordance to Authority portfolio’s goal and time horizon at the outset of the contract term and assist with the annual review and update of the Investment Policy.

2.3. Assist the Authority with developing an appropriate cash flow model to minimize balances held in highly liquid but low interest accounts (e.g., bank accounts and LAIF).

2.4. Assist the Authority with maturity analysis.

2.5. Provide credit analysis and assess risk of portfolio investments.

2.6. Work with the Authority’s third-party custodian for safekeeping of securities and provide services required to execute and settle investment trades. Contractor will not act as a custodian of assets in the account or have possession of any such assets.

2.7. Recommend and justify appropriate investment benchmarks.

2.8. Provide detailed monthly reports of investment portfolio activity, performance, holdings by investment type, maturity, broker, weighted average maturity, duration, benchmark comparison, and other such reports normally provided to governmental clients. Provide separate annual portfolio holding, activity, and performance reports and relevant GASB reports based on the Authority’s fiscal year (April 1 – May 31). Provide custom reports as requested by the Authority at no additional cost.

Agreement with PFM Asset Management /Exhibit A-Scope of Services Page 13 of 19 Rev. 07-01-18

2.9. Be available to Authority finance staff in a timely manner by telephone or email and meet with and provide information upon request, and if requested, to other interested parties such as the, Authority Board and/or Executive Director.

2.10. Attend Authority Board meetings for the annual review of the Investment Policy.

2.11. Provide assurance of portfolio compliance with all federal and State of California laws as well as ordinances, resolutions, and policies of the Authority relating to the investment of public funds.

2.12. Annually perform due diligence reviews of the broker/dealers, custodian bank, and financial institutions utilized by the Authority and provide supporting documentation to the Authority.

2.13. Act as a fiduciary agent to the Authority, serving as an independent advisor to represent the best interests of the Authority.

2.14. Demonstrate independence from any financial institution or securities brokerage firm, or fully disclose any such relationships relevant to qualified investments for public sector entities.

2.15. Keep Authority informed of changing economic conditions through flash emails, daily, weekly, and/or monthly reports including discussion of key economic indicators relevant to the regional, State, national, and global economies.

Agreement with PFM Asset Management/Exhibit B-Schedule of Fees Page 14 of 19 Rev. 07-01-18

EXHIBIT B

SCHEDULE OF FEES

1. MAXIMUM COMPENSATION

1.1. The maximum compensation the Authority will pay the Contractor for all professional fees, costs and expenses provided under this Agreement shall not exceed One Hundred Thousand Dollars ($100,000) during the Initial Term of the Agreement.

1.2. Any additional professional fees, costs and expenses requested by the Authority that would exceed the preceding maximum amount will be addressed in an Amendment to the Agreement. No additional services will be performed unless both Parties execute an Amendment outlining the services requested and the compensation agreed for such services.

2. FEES
For its services, Contractor shall receive an investment fee as set forth below:

An annual fee of 4.9 basis points (0.049%) based on the daily net assets under management.
“Daily net assets” is defined to include the amortized value of securities, accrued interest and cash or any money market fund balance.

3. INVOICING
Contractor will bill Authority on a monthly basis for Services provided by Contractor during the preceding month on an invoice and in a format approved by Authority and subject to verification and approval by Authority. Authority will pay Contractor within thirty (30) days of Authority’s receipt of coupon disbursements from investment portfolio best matched to the timing of an approved invoice.

Agreement with PFM Asset Management/Exhibit C-Insurance Requirements Page 15 of 19 Rev. 07-01-18

EXHIBIT C

INSURANCE REQUIREMENTS
Without limiting the Contractor’s indemnification of the Authority, and prior to commencing any of the Services required under this Agreement, the Contractor shall maintain in full force and effect during the period of performance of the Agreement and for twenty-four (24) months following acceptance by the Authority, at its sole cost and expense, the following insurance policies from insurance companies authorized to do business in the State of California. The required General Liability and Automobile Liability policies shall be primary insurance as to the Authority so that any other coverage held by the Authority shall not contribute to any loss under Contractor’s insurance. The minimum coverages, provisions and endorsements are as follows:

A. COMMERCIAL GENERAL LIABILITY INSURANCE

1. Commercial General Liability Insurance policy which provides coverage at least as broad as Insurance Services Office form CG 00 01. Policy limits are subject to review, but shall in no event be less than, the following:
$2,000,000 Each Occurrence
$4,000,000 General Aggregate
$2,000,000 Products/Completed Operations Aggregate
$1,000,000 Personal Injury

2. Exact structure and layering of the coverage shall be left to the discretion of Contractor; however, any excess or umbrella policies used to meet the required limits shall be at least as broad as the underlying coverage and shall otherwise follow form.

3. The following provisions shall apply to the Commercial Liability policy as well as any umbrella policy maintained by the Contractor to comply with the insurance requirements of this Agreement:
a. Coverage shall be on a “pay on behalf” basis with defense costs payable in addition to policy limits;
b. There shall be no cross liability exclusion which precludes coverage for claims or suits by one insured against another; and c. Coverage shall apply separately to each insured against whom a claim is made or a suit is brought, except with respect to the limits of liability.

B. BUSINESS AUTOMOBILE LIABILITY INSURANCE
Business automobile liability insurance policy which provides coverage at least as broad as ISO form CA 00 01 with policy limits a minimum limit of not less than one million dollars ($1,000,000) each accident using, or providing coverage at

Agreement with PFM Asset Management/Exhibit C-Insurance Requirements Page 16 of 19 Rev. 07-01-18
least as broad as, Insurance Services Office form CA 00 01. Liability coverage shall apply to all owned (if any), non-owned and hired autos.

C. WORKERS’ COMPENSATION

1. Workers’ Compensation Insurance Policy as required by statute and employer’s liability with limits of at least one million dollars ($1,000,000) policy limit Bodily Injury by disease, one million dollars ($1,000,000) each accident/Bodily Injury and one million dollars ($1,000,000) each employee Bodily Injury by disease.

2. The indemnification and hold harmless obligations of Contractor included in this Agreement shall not be limited in any way by any limitation on the amount or type of damage, compensation or benefit payable by or for Contractor or any subcontractor under any Workers’ Compensation Act(s), Disability Benefits Act(s) or other employee benefits act(s).

3. This policy must include a Waiver of Subrogation in favor of the Stadium Authority, its governing board, subordinate boards, officers, employees, volunteers and agents.

D. PROFESSIONAL LIABILITY
Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against negligent acts, errors or omissions of the Contractor. Covered services as designated in the policy must include work performed under this agreement.

Coverage shall be in an amount of not less than one million dollars ($1,000,000) per occurrence or two million dollars ($2,000,000) aggregate. Any deductible or self-retention shall be the responsibility of the Contractor.

E. COMPLIANCE WITH REQUIREMENTS
All of the following clauses and/or endorsements, or similar provisions, must be part of each commercial general liability policy, and each umbrella or excess policy.

1. Additional Insureds. The Santa Clara Stadium Authority, its governing board, subordinate boards, officers, employees, volunteers and agents (“Indemnified Parties”) are hereby added as additional insureds in respect to liability arising out of Consultant’s work for the Stadium Authority, using Insurance Services Office (ISO) Endorsement CG 20 10 11 85, or the combination of CG 20 10 03 97 and CG 20 37 10 01, or its equivalent.

2. Primary and non-contributing. Each insurance policy provided by Contractor shall contain language or be endorsed to contain wording making it primary insurance as respects to, and not requiring contribution from, any other insurance which the Indemnified Parties may possess,

Agreement with PFM Asset Management/Exhibit C-Insurance Requirements Page 17 of 19 Rev. 07-01-18
including any self-insurance or self-insured retention they may have. Any other insurance that the Indemnified parties may possess shall be considered excess insurance only and shall not be called upon to contribute with Contractor’s insurance.

3. Cancellation.
a. Each insurance policy shall contain language or be endorsed to reflect that no cancellation of the coverage provided due to non- payment of premiums shall be effective until written notice has been given to Authority at least ten (10) days prior to the effective date of such cancellation. In the event of non-renewal, written notice shall be given at least ten (10) days prior to the effective date of non-renewal.
b. Each insurance policy shall contain language or be endorsed to reflect that no cancellation of the coverage provided for any cause save and except non-payment of premiums shall be effective until written notice has been given to the Stadium Authority at least thirty (30) days prior to the effective date of such cancellation. In the event of non-renewal, written notice shall be given at least thirty (30) days prior to the effective date of non-renewal.

4. Other Endorsements. Other endorsements may be required for policies other than the commercial general liability policy if specified in the description of required insurance set forth in Sections A through E of this Exhibit C, above.

F. ADDITIONAL INSURANCE RELATED PROVISIONS
Contractor and Authority agree as follows:

1. Contractor agrees to ensure that subcontractors, and any other party involved with the Services, who is brought onto or involved in the performance of the Services by Contractor, provide the same minimum insurance coverage required of Contractor, except as with respect to limits. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement. Contractor agrees that upon request by Authority, all agreements with, and insurance compliance documents provided by, such subcontractors and others engaged in the project will be submitted to Authority for review.

2. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge

Agreement with PFM Asset Management/Exhibit C-Insurance Requirements Page 18 of 19 Rev. 07-01-18
Authority or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to Authority. It is not the intent of Authority to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against Authority for payment of premiums or other amounts with respect thereto.

3. The Authority reserves the right to withhold payments from the Contractor in the event of material noncompliance with the insurance requirements set forth in this Agreement.

G. EVIDENCE OF COVERAGE
Prior to commencement of any Services under this Agreement, Contractor, and each and every subcontractor (of every tier) shall, at its sole cost and expense, maintain not less than the minimum insurance coverage with the endorsements indicated in this Agreement. Such insurance coverage shall be maintained with insurers, and under forms of policies, satisfactory to Authority and as described in this Agreement. Contractor shall file with the Authority all certificates and endorsements for the required insurance policies for Authority’s approval as to adequacy of the insurance protection.

H. EVIDENCE OF COMPLIANCE
Contractor or its insurance broker shall provide the required proof of insurance compliance, consisting of Insurance Services Office (ISO) endorsement forms or their equivalent and the ACORD form 25-S certificate of insurance (or its equivalent), evidencing all required coverage shall be delivered to Authority, through its representative as set forth below, at or prior to execution of this Agreement. Unless otherwise required by the terms of this Agreement, all certificates, endorsements, coverage verifications and other items required to be delivered to Authority pursuant to this Agreement shall be mailed to:

Santa Clara Stadium Authority
c/o Ebix, Inc. or 1 Ebix Way
P.O. Box 100085 – S2 John’s Creek, GA 30097
Duluth, GA 30096

Telephone number: 951-766-2280
Fax number: 770-325-0409
Email address: [email protected]

Agreement with PFM Asset Management/Exhibit C-Insurance Requirements Page 19 of 19 Rev. 07-01-18
I. QUALIFYING INSURERS
All of the insurance companies providing insurance for Contractor shall have, and provide written proof of, an A. M. Best rating of at least A minus 6 (A- VI) or shall be an insurance company of equal financial stability that is approved by the Authority or its insurance compliance representative.

Agreement with Principal Bank Page 1
Rev. 07-01-18
EBIX Insurance No. *S20000_____

AGREEMENT FOR SERVICES

BETWEEN THE

SANTA CLARA STADIUM AUTHORITY
AND

PRINCIPAL BANK

PREAMBLE
This Agreement is entered into between the Santa Clara Stadium Authority, a joint powers agency created pursuant to Section 6532 of the California Government Code (SCSA) and Principal Bank, a Delaware corporation, (Contractor). SCSA and Contractor may be referred to individually as a “Party” or collectively as the “Parties” or the “Parties to this Agreement.”

RECITALS
A. SCSA desires to secure the services more fully described in this Agreement, at Exhibit A, entitled “Scope of Services”;
B. Contractor represents that it, and its subcontractors, if any, have the professional qualifications, expertise, necessary licenses and desire to provide certain goods and/or required services of the quality and type which meet objectives and requirements of SCSA; and,
C. The Parties have specified herein the terms and conditions under which such services will be provided and paid for.

The Parties agree as follows:

AGREEMENT TERMS AND CONDITIONS

1. AGREEMENT DOCUMENTS
The documents forming the entire Agreement between SCSA and Contractor shall consist of these Terms and Conditions and the following Exhibits, which are hereby incorporated into this Agreement by this reference:

Exhibit A – Scope of Services
Exhibit B – Schedule of Fees
Exhibit C – Insurance Requirements
Exhibit D – Custodial and Service Agreement
Exhibit E – Notice of Exercise of Option to Extend Agreement

Agreement with Principal Bank Page 2
Rev. 07-01-18
This Agreement, including the Exhibits set forth above, contains all the agreements, representations and understandings of the Parties, and supersedes and replaces any previous agreements, representations and understandings, whether oral or written. In the event of any inconsistency between the provisions of any of the Exhibits and the Terms and Conditions, the Terms and Conditions shall govern and control.

2. TERM OF AGREEMENT
A. Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by a written amendment to this Agreement, the term of this Agreement shall begin on October 1, 2023 and terminate on September 30, 2028.

B. After the Initial Term, SCSA reserves the right, at its sole discretion, to extend the term of this Agreement for up to two (2) additional one-year terms through September 30, 2030 or for one (1) additional two year term through September 30, 2030 (“Option Periods”), subject to the appropriation of funds. See Exhibit E for Notice of Exercise to Option to Extend Agreement Form.

3. SCOPE OF SERVICES & PERFORMANCE SCHEDULE
Contractor shall perform those Services specified in Exhibit A and Exhibit D within the time stated in Exhibit A and Exhibit D. Time is of the essence.

4. WARRANTY
Contractor expressly warrants that all materials and services covered by this Agreement shall be fit for the purpose intended, shall be free from defect and shall conform to the specifications, requirements and instructions upon which this Agreement is based. Contractor agrees to promptly replace or correct any incomplete, inaccurate or defective Services at no further cost to SCSA when defects are due to the negligence, errors or omissions of Contractor.

5. QUALIFICATIONS OF CONTRACTOR - STANDARD OF CARE
Contractor represents and maintains that it has the expertise in the professional calling necessary to perform the Services, and its duties and obligations, expressed and implied, contained herein, and SCSA expressly relies upon Contractor’s representations regarding its skills and knowledge. Contractor shall perform such Services and duties in conformance to and consistent with the professional standards of a custodian performing similar services in the industry.

6. COMPENSATION AND PAYMENT
In consideration for Contractor’s complete performance of Services, SCSA shall pay Contractor for all materials provided and Services rendered by Contractor in

Agreement with Principal Bank Page 3
Rev. 07-01-18
accordance with Exhibit B, entitled “SCHEDULE OF FEES.” The maximum compensation of this Agreement is set forth in Section 1 of Exhibit B, subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services. All work performed or materials provided in excess of the maximum compensation shall be at Contractor’s expense. Contractor shall not be entitled to any payment above the maximum compensation under any circumstance.

7. TERMINATION
A. Termination for Convenience. Both parties shall have the right to terminate this Agreement, without cause or penalty, by giving not less than Thirty (30) days’ prior written notice to other party.

B. Termination for Default. If Contractor fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided by law, SCSA may terminate this Agreement upon written notice to Contractor. SCSA will provide written notice to the Contractor of such failure and provide to Contractor the ability to cure the failure to perform within thirty (30) days. If Contractor does not reasonably cure such failure, SCSA may terminate the Agreement and compensate Contractor for services performed up to the time of the transfer to assets to the successor entity.

C. Upon termination, each Party shall assist the other in arranging an orderly transfer and close-out of services. As soon as possible following the notice of termination, but no later than thirty (30) days after the notice of termination, Contractor will deliver to SCSA all SCSA information or material that Contractor has in its possession. In the event more time is required, both parties must agree to the extend the time prior to the end of the thirty (30) days.

8. ASSIGNMENT AND SUBCONTRACTING
SCSA and Contractor bind themselves, their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred without the prior written approval of SCSA. Contractor shall not hire subcontractors without express written permission from SCSA.

Contractor shall be as fully responsible to SCSA for the acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as Contractor is for the acts and omissions of persons directly employed by it.

Contractor does not anticipate using subcontractors for performing core custodial services of asset custody and reporting. From time to time, Contractor may use third party vendors in the performance of certain ancillary services; sub-custodian services; operational, technological, and incidental functions; processing reporting; local and global settlement; investment accounting and

Agreement with Principal Bank Page 4
Rev. 07-01-18
risk/performance analytics; and/or back-office functions that assist it in its performance of services on a common basis for all or most of its customers utilizing such services. Such vendors are not considered to be subcontractors under this Agreement as they do not perform core custodial services of asset custody and reporting.

9. NO THIRD PARTY BENEFICIARY
This Agreement shall not be construed to be an agreement for the benefit of any third party or parties and no third party or parties shall have any claim or right of action under this Agreement for any cause whatsoever.

10. INDEPENDENT CONTRACTOR
Contractor and all person(s) employed by or contracted with Contractor to furnish labor and/or materials under this Agreement are independent contractors and do not act as agent(s) or employee(s) of SCSA. Contractor has full rights to manage its employees in their performance of Services under this Agreement.

11. CONFIDENTIALITY OF MATERIAL
All ideas, memoranda, specifications, plans, manufacturing procedures, data, drawings, descriptions, documents, discussions or other information developed or received by or for Contractor and all other written information submitted to Contractor in connection with the performance of this Agreement shall be held confidential by Contractor and shall not, without the prior written consent of SCSA, be used for any purposes other than the performance of the Services nor be disclosed to an entity not connected with performance of the Services.

Nothing furnished to Contractor which is: 1) otherwise known to Contractor, 2) becomes generally known to the related industry, 3) obtained from a third party not under a duty of confidentiality, 4) independently developed, or 5) agreed to in writing between the Parties to be free of the restrictions set forth in this Agreement shall be deemed confidential. Notwithstanding anything herein to the contrary, Contractor may disclose the information if made in response to a subpoena, valid order of a court or other tribunal or authorized agency of the government, or if made in connection with any audit or regulatory examination of the Contractor or any of its affiliates by any governmental agency. Contractor and its affiliates may disclose information provided to it by the SCSA for purposes of due diligence, risk assessment or other similar purposes.

12. OWNERSHIP OF MATERIAL
Except for Contractor’s proprietary information, all material, which shall include, but not be limited to, data, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports, designs, technology, programming, works of authorship and other material developed, collected, prepared or caused to be prepared under this Agreement shall be the property of SCSA but Contractor may retain

Agreement with Principal Bank Page 5
Rev. 07-01-18
and use copies thereof. SCSA shall not be limited in any way or at any time in its use of said material. However, Contractor shall not be responsible for damages resulting from the use of said material for work other than Project, including, but not limited to, the release of this material to third parties.

13. RIGHT OF SCSA TO INSPECT RECORDS OF CONTRACTOR
SCSA, through its authorized employees, representatives or agents shall have the right during the term of this Agreement and for four (4) years from the date of final payment for goods or services provided under this Agreement, to audit the books and records of Contractor for the purpose of verifying any and all charges made by Contractor in connection with Contractor compensation under this Agreement, including termination of Contractor.

To this end, upon reasonable
prior written request of SCSA, the Contractor shall permit SCSA, or its respective agents, employees or auditors to examine, audit, excerpt, transcribe and copy, at the SCSA’s expense, during the Contractor’s normal business hours, any books, documents, papers, and records relating to the Account or the assets.

Notwithstanding anything to the contrary contained in this Agreement, such right to examine shall not include the computer systems or processing systems from which data is generated; information, data or processes that are proprietary to the Contractor; materials, processes, or procedures related to recordkeeping, data access or data security; materials precluded by regulation, court order or regulatory authority; or physical facility audits.

Contractor agrees to maintain sufficient books and records in accordance with generally accepted industry practices to establish the correctness of all charges submitted to SCSA. Any expenses not so recorded shall be disallowed by SCSA.

Contractor shall submit to SCSA any and all reports concerning its performance under this Agreement that may be requested by SCSA in writing. Contractor agrees to assist SCSA in meeting SCSA’s reporting requirements to the State and other agencies with respect to Contractor’s Services hereunder.

14. HOLD HARMLESS/INDEMNIFICATION
A. To the extent permitted by law, Contractor agrees to defend, hold harmless and indemnify SCSA, its respective governing boards, commissions, officers, employees, volunteers and agents from and against any claim, injury, liability, loss, cost, and/or expense or damage, including all costs and attorney’s fees (“Claims”) arising directly from the Contractor’s negligence in performing the Services pursuant to this Agreement; provided the Contractor is give reasonable notice of any Claim and an opportunity to correct any alleged mistake defend against any action, and/or participate in any settlement proceeding and further provided that “negligence” for purposes of this provision shall not include the Contractor’s failure to consider the prudence or imprudence of any direction provided by a person authorized to give it. Additionally, the

Agreement with Principal Bank Page 6
Rev. 07-01-18
Contractor shall not be liable under this indemnification for Claims resulting from actions of the Contractor taken in accordance with direction of an authorized representative, or action omitted because no such direction was given. However, the obligation to indemnify shall not apply if such liability is ultimately adjudicated to have arisen through the negligence or willful misconduct of SCSA.

B. Notwithstanding anything to the contrary, the Contractor shall not be liable under any circumstances for indirect, incidental, consequential, or special damages in connection with this Agreement or the Services provided hereunder.

C. SCSA agrees to indemnify and hold the Contractor harmless for Claims which may be imposed, assessed or incurred against the Contractor, or the account, arising out of or in connection with the performance of the Contractor’s obligations in accordance with the provisions of this Agreement (including reasonable attorney’s fees). This provision does not extend to any liability, loss, claim, damages or expense arising from the negligence of the Contractor.

15. INSURANCE REQUIREMENTS
During the term of this Agreement, and for any time period set forth in Exhibit C, Contractor shall provide and maintain in full force and effect, at no cost to SCSA, insurance policies as set forth in Exhibit C.

16. WAIVER
Contractor agrees that waiver by SCSA of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Neither SCSA’s review, acceptance nor payments for any of the Services required under this Agreement shall be constructed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.

17. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to SCSA addressed as follows:

Santa Clara Stadium Authority
Attention: Executive Director
1500 Warburton Avenue
Santa Clara, CA 95050
and by e-mail at *[email protected]

And to Contractor addressed as follows:

Agreement with Principal Bank Page 7
Rev. 07-01-18
Principal Bank
222 South Ninth Street, 13th Floor
Minneapolis, MN 55402
and by e-mail at *_______________@XXX
The workday the e-mail was sent shall control the date notice was deemed given.

An e-mail transmitted after 1:00 p.m. on a Friday shall be deemed to have been transmitted on the following business day.

18. COMPLIANCE WITH LAWS
Contractor shall comply with all applicable laws and regulations of the federal, state and local government, including but not limited to “The Code of the City of Santa Clara, California” (“SCCC”). In particular, Contractor’s attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Certificate (SCCC section 3.40.060), and Food and Beverage Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally Contractor has read and agrees to comply with the City of Santa Clara’s Ethical Standards (http://santaclaraca.gov/home/showdocument?id=58299
).

19. CONFLICTS OF INTEREST
Contractor certifies that to the best of its knowledge, no SCSA officer, employee or authorized representative has any financial interest in the business of Contractor and that no person associated with Contractor has any interest, direct or indirect, which could conflict with the faithful performance of this Agreement.

Contractor is familiar with the provisions of California Government Code section 87100 and following, and certifies that it does not know of any facts which would violate these code provisions. Contractor will advise SCSA if a conflict arises.

20. FAIR EMPLOYMENT
Contractor shall not discriminate against any employee or applicant for employment because of race, sex, color, religion, religious creed, national origin, ancestry, age, gender, marital status, physical disability, mental disability, medical condition, genetic information, sexual orientation, gender expression, gender identity, military and veteran status, or ethnic background, in violation of federal, state or local law.

21. NO USE OF SCSA NAME OR EMBLEM
Contractor shall not use SCSA’s name, insignia, or emblem, or distribute any information related to services under this Agreement in any magazine, trade paper, newspaper or other medium without express written consent of SCSA.

Agreement with Principal Bank Page 8
Rev. 07-01-18

22. GOVERNING LAW AND VENUE
This Agreement shall be governed and construed in accordance with the statutes and laws of the State of California. The venue of any suit filed by either Party shall be vested in the state courts of the County of Santa Clara, or if appropriate, in the United States District Court, Northern District of California, San Jose, California.

23. SEVERABILITY CLAUSE
In case any one or more of the provisions in this Agreement shall, for any reason, be held invalid, illegal or unenforceable in any respect, it shall not affect the validity of the other provisions, which shall remain in full force and effect.

24. AMENDMENTS
This Agreement may only be modified by a written amendment duly authorized and executed by the Parties to this Agreement.

25. COUNTERPARTS
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.

NOTE: SIGNATURES ON FOLLOWING PAGE

Agreement with Principal Bank Page 9
Rev. 07-01-18
The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives.

SANTA CLARA STADIUM AUTHORITY
a Joint Exercise Of Powers Entity,
created through Government Code sections 6500 et seq.

APPROVED AS TO FORM: Dated: ________________________

GLEN R. GOOGINS
Stadium Authority Counsel

JŌVAN D. GROGAN
Executive Director
Santa Clara Stadium Authority
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
“STADIUM AUTHORITY”

PRINCIPAL BANK
a Delaware corporation
Dated:

By (Signature):

Name:

Title:

Principal Place of
Business Address:

Email Address:

Telephone: ( )
Fax: ( )
Dated:

By (Signature):
“CONTRACTOR”

Agreement with Principal Bank/Exhibit A-Scope of Services Page 1 Rev. 07-01-18

EXHIBIT A

SCOPE OF SERVICES
The Services to be performed for the SCSA by the Contractor under this Agreement are set forth below.

Service Requirements:

The selected bank shall provide custodian services for the entire Portfolio. Custodian services shall include but are not limited to:

1. Maintain a custodian account for SCSA’s cash and securities.

2. Deposit investment-related net daily uninvested cash into a FDIC-insured and collateralized sweep vehicle for public funds by the custodian. SCSA will maintain this arrangement until further notice in writing.

3. Security purchases shall be settled on a delivery versus payment basis.

4. Provide same day credit on all coupons. A delay in credit will require interest to be paid to SCSA at that day’s Federal Funds rate.

5. Segregate SCSA’s cash and securities from the assets of the custodian’s other customers. The custodian shall have only the custody of securities and securities shall be and remain the sole property of SCSA. The securities held by the custodian shall be registered in the name of SCSA.

6. Settle and deliver securities as directed by SCSA through any broker or investment manager selected by SCSA,

7. Create, maintain and retain all records relating to securities held in custody in SCSA’s account to meet the requirements and obligations under generally accepted accounting principles.

8. Wire coupon receipts to SCSA’s designated bank account at the end of each business day.

9. Provide on-line reporting of portfolio activity and holdings on a real-time or same day basis.

10. Provide online monthly activity statements and reports including the par, original cost, and market value of all portfolio holdings (the statement cut off should be the last day of each month).

11. Provide monthly activity statements and reports for all accounts. The statement cut off should be the last day of each month.

Agreement with Principal Bank/Exhibit A-Scope of Services Page 2 Rev. 07-01-18

12. Provide year end holding statements and reports including maturity dates and credit rating of all portfolio holdings for the purpose of Government Accounting Standards Board (GASB) Statement No. 40 compilation.

13. Provide corporate action reporting to the SCSA regarding bond calls, conversions, tender offers, exchanges, receipt of stock rights, mergers and reorganizations, and other events that affect account holdings.

Agreement with Principal Bank/Exhibit B-Schedule of Fees Page 1 Rev. 07-01-18

EXHIBIT B

SCHEDULE OF FEES

1. MAXIMUM COMPENSATION

1.1. The maximum amount payable for all services provided under this Agreement shall not exceed Seventy-Five Thousand Dollars ($75,000), during the Initial Five-Year Term of the Agreement. After the Initial Term, the maximum compensation shall be as set forth in the executed Notice of Exercise of Option to Extend Agreement (Exhibit E).

1.2. Any additional fees, costs and expenses requested by the Authority that would exceed the preceding maximum amount will be addressed in an Amendment to the Agreement. No additional services shall be performed unless both Parties execute an Amendment outlining the services requested and compensation agreed for such services.

2. FEE AND OPTION RENEWALS

2.1. Authority will pay Contractor according to the fees specified below:

Service Description Fee
Annual Minimum Fee $12,500
Administration Fee - Asset-Based Fee
(excluding Sweep)
2 Basis Points (market value
*.0002)
Administration Fee - Asset-Based Fee -
Sweep Assets 0 Points
Web Tool Fee - Custody Solutions Reports Included - No Charge Web Tool Fee - Custody Solutions
Statements Included - No Charge
Accounting & Reporting Fees Included - No Charge

2.2. Fee(s) shall be fixed for the Initial Five-Year Term of the Agreement.

2.3. Fee Adjustments: Contractor may request adjustments to its fee prior to any one-year option. Fee increase requests must be supported by a relevant industry specific index. Requests for increase must be fully documented by Contractor. Price adjustments are subject to Authority's approval.

3. INVOICING REQUIREMENTS

3.1. Contractor shall invoice Authority on a monthly basis for services provided by Contractor during the preceding month on an invoice and in a format approved by Authority and subject to verification and approval by Authority.

Agreement with Principal Bank/Exhibit B-Schedule of Fees Page 2 Rev. 07-01-18

3.2. Authority will pay Contractor within thirty (30) days of Authority’s receipt of coupon disbursements from investment portfolio best matched to the timing of an approved invoice.

Agreement with Principal Bank/Exhibit C-Insurance Requirements Page 1 Rev. 07-01-18

EXHIBIT C

INSURANCE REQUIREMENTS
Without limiting the Consultant’s indemnification of the Santa Clara Stadium Authority (“Stadium Authority”), and prior to commencing any of the Services required under this Agreement, the Consultant shall provide and maintain in full force and effect during the period of performance of the Agreement and for twenty-four (24) months following acceptance by the Stadium Authority, at its sole cost and expense, the following insurance policies from insurance companies authorized to do business in the State of California. These policies shall be primary insurance as to the Stadium Authority so that any other coverage held by the Stadium Authority shall not contribute to any loss under Consultant’s insurance. The minimum coverages, provisions and endorsements are as follows:

A. COMMERCIAL GENERAL LIABILITY INSURANCE

1. Commercial General Liability Insurance policy which provides coverage at least as broad as Insurance Services Office form CG 00 01. Policy limits are subject to review, but shall in no event be less than, the following:
$1,000,000 Each Occurrence
$2,000,000 General Aggregate
$2,000,000 Products/Completed Operations Aggregate
$1,000,000 Personal Injury

2. Exact structure and layering of the coverage shall be left to the discretion of Consultant; however, any excess or umbrella policies used to meet the required limits shall be at least as broad as the underlying coverage and shall otherwise follow form.

3. The following provisions shall apply to the Commercial Liability policy as well as any umbrella policy maintained by the Consultant to comply with the insurance requirements of this Agreement:
a. Coverage shall be on a “pay on behalf” basis with defense costs payable in addition to policy limits;
b. There shall be no cross liability exclusion which precludes coverage for claims or suits by one insured against another; and c. Coverage shall apply separately to each insured against whom a claim is made or a suit is brought, except with respect to the limits of liability.

B. BUSINESS AUTOMOBILE LIABILITY INSURANCE
Business automobile liability insurance policy which provides coverage at least as broad as ISO form CA 00 01 with policy limits a minimum limit of not less than

Agreement with Principal Bank/Exhibit C-Insurance Requirements Page 2 Rev. 07-01-18
one million dollars ($1,000,000) each accident using, or providing coverage at least as broad as, Insurance Services Office form CA 00 01. Liability coverage shall apply to all owned (if any), non-owned and hired autos.

C. WORKERS’ COMPENSATION

1. Workers’ Compensation Insurance Policy as required by statute and employer’s liability with limits of at least one million dollars ($1,000,000) policy limit Bodily Injury by disease, one million dollars ($1,000,000) each accident/Bodily Injury and one million dollars ($1,000,000) each employee Bodily Injury by disease.

2. This policy must include a Waiver of Subrogation in favor of the Stadium Authority, its governing board, subordinate boards, officers, employees, volunteers and agents.

D. PROFESSIONAL LIABILITY
Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against negligent acts, errors or omissions of the Consultant. Covered services as designated in the policy must specifically include work performed under this agreement. Coverage shall be in an amount of not less than one million dollars ($1,000,000) per occurrence or two million dollars ($2,000,000) aggregate.

E. COMPLIANCE WITH REQUIREMENTS
All of the following clauses and/or endorsements, or similar provisions, must be part of each commercial general liability policy, and each umbrella or excess policy, unless where noted otherwise.

1. Additional Insureds. The Santa Clara Stadium Authority, its governing board, subordinate boards, officers, employees, volunteers and agents (“Indemnified Parties”) are hereby added as additional insureds in respect to liability arising out of Consultant’s work for the Stadium Authority, using Insurance Services Office (ISO) Endorsement CG 20 10 11 85, or the combination of CG 20 10 03 97 and CG 20 37 10 01, or its equivalent.

2. Primary and non-contributing. Each insurance policy provided by Consultant shall contain language or be endorsed to contain wording making it primary insurance as respects to, and not requiring contribution from, any other insurance which the Indemnified Parties may possess, including any self-insurance or self-insured retention they may have. Any other insurance that the Indemnified Parties may possess shall be considered excess insurance only and shall not be called upon to contribute with Consultant’s insurance.

3. Cancellation.

Agreement with Principal Bank/Exhibit C-Insurance Requirements Page 3 Rev. 07-01-18
a. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided due to non-payment of premiums shall be effective until written notice has been given to the Stadium Authority at least ten (10) days prior to the effective date of such modification or cancellation.

In the event of non-renewal, written notice shall be given at least ten (10) days prior to the effective date of non-renewal. b. In the event of non-renewal, Contractor shall provide written notice to SCSA at least thirty (30) days prior to the effective date of non- renewal.

4. Other Endorsements. Other endorsements may be required for policies other than the commercial general liability policy if specified in the description of required insurance set forth in Sections A through E of this Exhibit C, above.

F. ADDITIONAL INSURANCE RELATED PROVISIONS
Consultant and the Stadium Authority agree as follows:

1. Consultant agrees to ensure that subcontractors, and any other party involved with the Services, who is brought onto or involved in the performance of the Services by Consultant, provide the same minimum insurance coverage required of Consultant, except as with respect to limits. Consultant agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement. Consultant agrees that upon request by the Stadium Authority, all agreements with, and insurance compliance documents provided by, such subcontractors and others engaged in the project will be submitted to the Stadium Authority for review.

Contractor does not anticipate using subcontractors for performing core custodial services of asset custody and reporting. From time to time, Contractor may use third party vendors in the performance of certain ancillary services; sub-custodian services; operational, technological, and incidental functions; processing reporting; local and global settlement; investment accounting and risk/performance analytics; and/or back-office functions that assist it in its performance of services on a common basis for all or most of its customers utilizing such services. Such vendors are not considered to be subcontractors under this Agreement as they do not perform core custodial services of asset custody and reporting.

2. Consultant agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge the Stadium Authority or Consultant for the cost of additional insurance

Agreement with Principal Bank/Exhibit C-Insurance Requirements Page 4 Rev. 07-01-18
coverage required by this Agreement. Any such provisions are to be deleted with reference to the Stadium Authority. It is not the intent of the Stadium Authority to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against the Stadium Authority for payment of premiums or other amounts with respect thereto.

3. The Stadium Authority reserves the right to withhold payments from the Consultant in the event of material noncompliance with the insurance requirements set forth in this Agreement.

G. EVIDENCE OF COVERAGE
Prior to commencement of any Services under this Agreement, Consultant, and each and every subcontractor (of every tier) shall, at its sole cost and expense, provide and maintain not less than the minimum insurance coverage with the endorsements and deductibles indicated in this Agreement. Such insurance coverage shall be maintained as described in this Agreement. Consultant shall file with the Stadium Authority all certificates and endorsements for the required insurance policies for the Stadium Authority’s approval as to adequacy of the insurance protection.

H. EVIDENCE OF COMPLIANCE
Consultant or its insurance broker shall provide the required proof of insurance compliance, consisting of Insurance Services Office (ISO) endorsement forms or their equivalent and the ACORD form 25-S certificate of insurance (or its equivalent), evidencing all required coverage, and be delivered to the Stadium Authority through its representative as set forth below, at or prior to execution of this Agreement. Unless otherwise required by the terms of this Agreement, all certificates, endorsements, coverage verifications and other items required to be delivered to the Stadium Authority pursuant to this Agreement shall be emailed to:
[email protected]

Or mailed to:

Santa Clara Stadium Authority
c/o Ebix, Inc.

P.O. Box 100085 – S2
Duluth, GA 30096

Telephone number: 951-766-2280
Fax number: 770-325-0409

Agreement with Principal Bank/Exhibit C-Insurance Requirements Page 5 Rev. 07-01-18
I. QUALIFYING INSURERS
All of the insurance companies providing insurance for Consultant shall have, and provide written proof of, an A. M. Best rating of at least A minus 6 (A- VI) or shall be an insurance company of equal financial stability that is approved by the Stadium Authority or its insurance compliance representatives.

Non-ERISA Custodial Agreement
September 2022 | Created on: 09/11/2023 10:08 AM

Page 1 of 5 ends
← All documents from this meeting