Cities Index.
Agenda packet

City Council and Authorities Concurrent
December 19, 2023

Document
Agenda packet
Meeting
December 19, 2023
Body
City Council and Authorities Concurrent
Pages
6
Original file
5.0 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar.com. That file is the official record.

City of Santa Clara
Meeting Agenda
Call and Notice of Special Meeting of the
City Council &
Santa Clara Stadium Authority
Hybrid Meeting
City Hall Council Chambers/Virtual
1500 Warburton Avenue
Santa Clara, CA 95050
5:00 PMTuesday, December 19, 2023
The City of Santa Clara is conducting City Council meetings in a hybrid manner (in-person and continues to have methods for the public to participate remotely). • Via Zoom:
o https://santaclaraca.zoom.us/j/99706759306
Meeting ID: 997-0675-9306
o Phone 1(669) 900-6833
How to Submit Written Public Comment Before City Council Meeting:

1. Use the eComment tab located on the City Council Agenda page https://santaclara.legistar.com/Calendar.aspx. eComments are directly sent to the iLegislate application used by City Council and staff, and become part of the public record. eComment closes 15 minutes before the start of a meeting.

2. By email to [email protected] by 12 p.m. the day of the meeting. Those emails will be forwarded to the Council and will be uploaded to the City Council Agenda as supplemental meeting material. Emails received after the 12 p.m. cutoff time up through the end of the meeting will form part of the meeting record. Please identify the Agenda Item Number in the subject line of your email.

NOTE: Please note eComments and Emails received as public comment will not be read aloud during the meeting.

Agendas, Staff Reports and some associated documents for City Council items may be viewed on the Internet at https://santaclara.legistar.com/Calendar.aspx All public records relating to an open session item on this agenda, which are not exempt from disclosure pursuant to the California Public Records Act, that are distributed to a majority of the legislative body will be available for public inspection at the Office of the City Clerk at Sana Clara City Hall, 1500 Warburton Avenue, Santa Clara, CA 95050 at the same time that the public records are distributed or made available to the legislative body. Any draft contracts, ordinances and resolutions posted on the Internet site or distributed in advance of the Council meeting may not be the final documents approved by the City Council. For the final document, you many contact the Office of the City Clerk at (408) 615-2220 or [email protected].

Page 1 of 6 ends

Special City Council and Stadium
Authority Meeting
Meeting Agenda December 19, 2023
NOTICE IS HEREBY GIVEN that, pursuant to the provisions of California Government Code §54956 (“The Brown Act”) and Section 708 of the Santa Clara City Charter, the Mayor/Chair calls for a Special Meeting of the City Council of the City of Santa Clara, the Governing Board of the Stadium Authority, to commence and convene on December 19, 2023, at 5:00 pm for a Special Meeting to be held virtually and in the City Hall Council Chambers located in the East Wing of City Hall at 1500 Warburton Avenue, Santa Clara, California, to consider the following matter(s) and to potentially take action with respect to them.

Closed Session - 5:00 PM | Special Meeting - 7:00 PM
5:00 PM CLOSED SESSION
Call to Order in the Council Chambers
Roll Call

1.A Conference with Legal Counsel-Existing Litigation (CC, SA) Pursuant to Gov. Code § 54956.9(d)(1)
Forty Niners SC Stadium
Company LLC v. Santa Clara Stadium
Authority, JAMS Consolidated Case No. 1110024318
23-1508

1.B Conference with Legal Counsel-Anticipated Litigation (CC) Pursuant to Gov. Code § 54956.9(e)(5) - Exposure to litigation Number of potential cases: 1
Facts and Circumstances:

Letter dated December 13
, 2023 from the Sutton Law Firm Re:

Proposed Charter Amendment to Make the Chief of Police
Position Appointed by the City Manager - Demand That the City Stipulate to a Judgment Amending the Ballot Question
(Letter Attached)
23-1700
Public Comment
The public may provide comments regarding the Closed Session item(s) just prior to the Council beginning the Closed Session. Closed Sessions are not open to the public.

Convene to Closed Session (Council Conference Room)
7:00 PM SPECIAL COUNCIL MEETING

Page 2 of 6 ends

Meeting Agenda December 19, 2023
Call to Order in the Council Chambers
Pledge of Allegiance and Statement of Values

REPORTS OF ACTION TAKEN IN CLOSED SESSION MATTERS

CONSENT CALENDAR
[Items listed on the CONSENT CALENDAR are considered routine and will be adopted by one motion. There will be no separate discussion of
the items on the CONSENT CALENDAR unless discussion is requested by a member of the Council, staff, or public. If so requested, that item will be removed from the CONSENT CALENDAR and considered under CONSENT ITEMS PULLED FOR DISCUSSION.]

2. Authorize the City Manager to execute Side Letter Agreements between the City of
Santa Clara and Engineers of the City of
Santa Clara, City of Santa Clara Employees’ Association, American Federation of State, County and Municipal
Employees, Local 101, Unclassified Police Management
Association, Unclassified Fire Management Employees, and Public Safety Non-Sworn Employees Association that provides pay at the double time rate for employees that are required to work at the Levi’s Stadium on December 25, 2023, and approve the double time rate of pay for As-Needed employees (excluding Retired Annuitants) that are scheduled to work at the Levi’s Stadium on December 25, 2023
23-1543
Authorize the City Manager to execute Side Letter
Agreements between the City of Santa Clara and
Engineers of the City of Santa Clara, City of Santa
Clara Employees’ Association, American Federation
of State, County and Municipal Employees, Local 101,
Unclassified Police Management Association,
Unclassified Fire Management Employees, and
Public Safety Non-Sworn Employees Association that
provides pay at the double time rate for employees
that are required to work at the Levi’s Stadium on
December 25, 2023, and approve the double time
rate of pay for As-Needed employees (excluding
Retired Annuitants) that are scheduled to work at the
Levi’s Stadium on December 25, 2023
Recommendation:

PUBLIC HEARING/GENERAL BUSINESS

Page 3 of 6 ends

Special City Council and Stadium
Authority Meeting
Meeting Agenda December 19, 2023

3. Public Hearing: Actions on the Zoning Code Update Including:

Adoption of an Addendum
to the City’s General Plan EIR for the
Zoning Code Update; Adoption of a Resolution for General Plan Text Amendments Related to the Zoning Code Update,
Including the Removal of Manufacturing Limitations in the Low- and High-Intensity Office/R+D General Plan Designations, Allowing Medical Uses in the High-Intensity Office/R+D
Designation, and Clarifying the Definition of Floor Area Ratio; and Waive First Reading and Introduce an Ordinance Amending Title 18 of the Santa Clara City Code Including Changes Recommended by the Planning Commission
23-585

1. Adopt an addendum to the City’s General Plan EIR
for the Zoning Code Update.

2. Adopt a Resolution for General Plan Text
Amendments related to the Zoning Code Update,
including the removal of manufacturing limitations in
the Low- and High-Intensity Office/R+D General Plan
designations; allowing medical uses in the
High-Intensity Office/R+D designation; and clarifying
the definition of Floor Area Ratio.

3. Waive first reading and Introduce the Ordinance
amending Title 18 of the Santa Clara City Code to
implement the Zoning Code Update including
changes as recommended by the Planning
Commission. Direct staff to implement Articles 1 and
3-8 of the Zoning Code Update along with the single
family provisions in Article 2, with the exception of
Short-term Rental Regulations, Section 18.60.250
which is deferred for nine (9) months to develop a
monitoring and compliance program.

Recommendation:

4. Adopt a Resolution in Support of United Against Hate in the City of Santa Clara
23-1474
Adopt a Resolution in Support of United Against Hate
in the City of Santa Clara
Recommendation:

REPORTS OF MEMBERS, SPECIAL COMMITTEES AND COUNCILMEMBER 030

REQUESTS
(This section is reserved for Councilmembers to provide reports, and /or submit written 030 requests for Council consideration)

Page 4 of 6 ends

Special City Council and Stadium
Authority Meeting
Meeting Agenda December 19, 2023

5. Action on a Council Written Request (Council Policy 030) Submitted by
Vice Mayor Park Requesting to Place an Agenda
Item at a Future Council Meeting to Consider a Resolution Addressing the Concerns Brought by Constituents at the
December 12, 2023 Regular Council Meeting
23-1701
Staff makes no recommendation.Recommendation:

CITY MANAGER/EXECUTIVE DIRECTOR REPORT

ADJOURNMENT
The next regular scheduled meeting is on Tuesday, January 9, 2024 in the City Hall Council Chambers.

Page 5 of 6 ends

Special City Council and Stadium
Authority Meeting
Meeting Agenda December 19, 2023
The time limit within which to commence any lawsuit or legal challenge to any quasi-adjudicative decision made by the City is governed by Section 1094.6 of the Code of Civil Procedure, unless a shorter limitation period is specified by any other provision. Under Section 1094.6, any lawsuit or legal challenge to any quasi-adjudicative decision made by the City must be filed no later than the 90th day following the date on which such decision becomes final. Any lawsuit or legal challenge, which is not filed within that 90-day period, will be barred. If a person wishes to challenge the nature of the above section in court, they may be limited to raising only those issues they or someone else raised at the meeting described in this notice, or in written correspondence delivered to the City of Santa Clara, at or prior to the meeting. In addition, judicial challenge may be limited or barred where the interested party has not sought and exhausted all available administrative remedies.

STREAMING SERVICES: As always, the public may view the meetings on SantaClaraCA.gov, Santa Clara City Television (Comcast cable channel 15 or AT&T U-verse channel 99), or the livestream on the City’s YouTube channel or Facebook page.

Note: The public cannot participate in the meeting through these livestreaming methods; livestreaming capabilities may be disrupted at times, viewers may always view and participate in meetings in-person and via Zoom as noted on the agenda.

AB23 ANNOUNCEMENT: Members of the Santa Clara Stadium Authority, Sports and Open Space Authority and Housing Authority are entitled to receive $30 for each attended meeting.

Note: The City Council and its associated Authorities meet as separate agencies but in a concurrent manner. Actions taken should be considered actions of only the identified policy body.

LEGEND: City Council (CC); Stadium Authority (SA); Sports and Open Space Authority (SOSA); Housing Authority (HA); Successor Agency to the City of Santa Clara Redevelopment Agency (SARDA); Bayshore North Project Enhancement Authority (BNPEA); Public Facilities Financing Corporation (PFFC) Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.

If a member of the public submits a speaker card for any agenda items, their name will appear in the Minutes. If no speaker card is submitted, the Minutes will reflect "Public Speaker." In accordance with the requirements of Title II of the Americans with Disabilities Act of 1990 ("ADA"), the City of Santa Clara will not discriminate against qualified individuals with disabilities on the basis of disability in its services, programs, or activities, and will ensure that all existing facilities will be made accessible to the maximum extent feasible. The City of Santa Clara will generally, upon request, provide appropriate aids and services leading to effective communication for qualified persons with disabilities including those with speech, hearing, or vision impairments so they can participate equally in the City’s programs, services, and activities. The City of Santa Clara will make all reasonable modifications to policies and programs to ensure that people with disabilities have an equal opportunity to enjoy all of its programs, services, and activities.

Agendas and other written materials distributed during a public meeting that are public record will be made available by the City in an appropriate alternative format. Contact the City Clerk’s Office at 1 408-615-2220 with your request for an alternative format copy of the agenda or other written materials.

Individuals who require an auxiliary aid or service for effective communication, or any other disability-related modification of policies or procedures, or other accommodation, in order to participate in a program, service, or activity of the City of Santa Clara, should contact the City’s ADA Coordinator at 408-615-3000 as soon as possible but no later than 48 hours before the scheduled event.

Page 6 of 6 ends

MEETING DISCLOSURES
Special City Council and Stadium
Authority Meeting
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-1508 Agenda Date: 12/19/2023

SUBJECT
Conference with Legal Counsel-Existing Litigation (CC, SA) Pursuant to Gov. Code § 54956.9(d)(1)
Forty Niners SC Stadium Company LLC v. Santa Clara Stadium Authority, JAMS Consolidated Case No. 1110024318
City of Santa Clara Printed on 12/15/2023Page 1 of 1
powered by Legistar™
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-1700 Agenda Date: 12/19/2023

SUBJECT
Conference with Legal Counsel-Anticipated Litigation (CC) Pursuant to Gov. Code § 54956.9(e)(5) - Exposure to litigation Number of potential cases: 1
Facts and Circumstances:

Letter dated December 13, 2023 from the Sutton Law Firm Re: Proposed Charter Amendment to Make the Chief of Police Position Appointed by the City Manager - Demand That the City Stipulate to a Judgment Amending the Ballot Question
(Letter Attached)
City of Santa Clara Printed on 12/15/2023Page 1 of 1
powered by Legistar™

I THE SUTTON LAW FIRM I
December 13, 2023

VIA EMAIL ONLY
Glen R. Googins, Esq.

City Attorney, City of Santa Clara
1500 Warburton Avenue
Santa Clara, CA 95050
RE: Proposed Charter Amendment to Make the Chief of Police Position Appointed by the City Manager - Demand That City Stipulate to a Judgment Amending the Ballot Question
Dear Mr. Googins:

Please be advised that we represent Santa Clara voters Satish Chandra, Joyce Davis and Carolyn McAllister ("Petitioners") in connection with this demand that the City of Santa Clara stipulate to a Judgment amending the ballot question for the proposed charter amendment to make the Chief of Police position appointed by the City Manager (the "Measure").

Because the ballot question as presently worded - "Shall an amendment to the City Charter providing that the Police Chief position be appointed by the City Manager be adopted?" - fails to inform voters that the Police Chief position is currently an elected position, it is biased, likely to prejudice voters in favor of the Measure, violates the law and must be amended before being presented to the voters.

As you are no doubt aware, California Elections Code section 13119( c) requires that ballot questions for local measures constitute "a true and impartial synopsis of the purpose of the proposed measure, and shall be in language that is neither argumentative nor likely to create prejudice for or against the measure." California courts interpret this provision to mean that ballot questions "must not be false, misleading, or partial to one side." (McDonough v. Superior Court (2012) 204 Cal.App.4th 1169, 1174.) Official ballot materials have long been considered to "have a substantial impact on the equality and fairness of the electoral process." (Patterson v. Board Supervisors (1998) 202 Cal.App.3d 22, 30.) The ballot question is held to an even higher standard­ "hemmed in by the constitutional guarantees of equal protection and freedom of speech." In this regard, "the wording on a ballot or the structure of the ballot cannot favor a particular partisan position." (Huntington Beach City Council v. Superior Court (2002) 94 Cal.App.4th 1417, 1433.)
150 Post Street, Suite 405 ■ San Francisco, CA 94108
Tel: 415/732-7700 ■ Fax: 415/732-7701 ■ www.campaignlawyers.com Glen R. Googins, Esq.

City Attorney, City of Santa Clara
December 13, 2023
Page2
California Elections Code section 13 314 expressly provides a remedy where a ballot question deviates from legal requirements. Specifically, section 13314(a) requires that the Court issue a writ of mandate to amend ballot language upon clear and convincing proof that there is an error, omission, or neglect of duty in connection with the ballot question, and that the court's relief will not interfere with the conduct of the election.

By refusing to include specific information about the current state of the law · relative to the Police Chief position being elected, the City Council is depriving the voters of critical information about important aspects of the Measure. Moreover, the City Council is obscuring key details of the Measure, thereby leaving voters uninformed and misled as to the Measure's practical effect. By omitting this information, the ballot question is biased in favor of the Measure.

Further, although California Elections Code section 9051 permits local ballot questions to be up to 7 5 words, the question as currently worded is only 21 words.

Accordingly, there is sufficient space to add words that would explain that the position of Police Chief is currently an elected position, thus making the ballot question impartial and legal.

Our review of what transpired at the City Council's December 5, 2023 meeting and prior meetings reveals the following, which we believe will assist our clients in making their case should adversarial litigation be required:
1) You appear to have acknowledged that the ballot question pushes the envelope by saying that if the question is challenged in court, a Judge may agree that it is legally infirm;
2) Assistant City Manager Cynthia Bojorquez acknowledged that the ballot question was developed from successful language in similar measures in other local jurisdictions;
3) An election attorney put the Council on notice that the ballot question was illegal and engineered to get a Yes vote;
4) The Mayor and at least one Councilmember expressed concerns that the ballot question is confusing, biased and misleading; and
Glen R. Googins, Esq.

City Attorney, City of Santa Clara
December 13, 2023

Page 3 ends

5) The Santa Clara Police Officers Association put the Council on notice of the results of a survey that revealed that 66 percent of Santa Clara citizens were not aware that the Police Chief is currently an elected position.

In light of the foregoing, demand is hereby made that the City stipulate to a Judgment that amends the ballot question to read "Shall an amendment to the City Charter providing that the Police Chief position be appointed by the City Manager, instead of elected by the voters, be adopted?" or words to that effect, such that the voters are informed of both the status quo and the proposed amendment to the Charter.

Because the time for the City Council to amend the ballot question on its own has passed, a court order will be required to amend the question. We request that the City agree to a Stipulated Judgment in order to avoid adversarial litigation. Should the City fail to do so, be advised that we intend to pursue the matter in court via a contested Petition for Writ of Mandate and Complaint for Injunctive and Declaratory Relief. If and when we prevail, be advised that we intend to seek attorneys' fees and costs from the City pursuant to California Code of Civil Procedure section 1021.5.

We look forward to hearing from you by the close of business on Thursday, December 14, 2023. Due to the truncated timeframe for resolving pre-election ballot disputes, we intend to file a lawsuit on or before Monday, December 18, 2023 and seek an expedited briefing schedule and hearing date.

Thank you for your attention to this important matter.

Glen R. Googins, Esq.

City Attorney, City of Santa Clara
December 13, 2023
Page4
cc: Lisa M. Gillmor, Mayor
Kathy Watanabe, Councilmember
Raj Chahal, Councilmember
Karen Hardy, Councilmember
Kevin Park, Councilmember
Sudhanshu "Suds" Jain, Councilmember
Anthony J. Becker, Councilmember
Jovan D. Grogan, City Manager
Hosam Haggag, City Clerk
Shannon Bushey, Santa Clara County Registrar of Voters
Tony Lopresti, Esq., Santa Clara County Counsel
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-1543 Agenda Date: 12/19/2023

REPORT TO COUNCIL

SUBJECT
Authorize the City Manager to execute Side Letter Agreements between the City of Santa Clara and Engineers of the City of Santa Clara, City of Santa Clara Employees’ Association, American Federation of State, County and Municipal Employees, Local 101, Unclassified Police Management Association, Unclassified Fire Management Employees, and Public Safety Non-Sworn Employees Association that provides pay at the double time rate for employees that are required to work at the Levi’s Stadium on December 25, 2023, and approve the double time rate of pay for As-Needed employees (excluding Retired Annuitants) that are scheduled to work at the Levi’s Stadium on December 25, 2023

COUNCIL PILLAR
Enhance Community Engagement and Transparency

BACKGROUND
The Santa Clara Stadium Authority and City are actively planning for the upcoming San Francisco 49ers vs. Baltimore Ravens football game at the Levi’s Stadium that is scheduled on Christmas Day, December 25, 2023.

City staff including sworn, non-sworn and As-Needed (Temporary) employees provide police, traffic and emergency services during events held at the Levi’s Stadium. Sufficient staffing levels are provided to ensure a safe and successful event at the Levi’s Stadium.

In an effort to provide employees an additional incentive for having to work at the Levi’s Stadium on Christmas Day, a request was made to the Forty Niners SC Stadium Company, LLC (49ers) to approve an increase the public safety cost threshold on a one-time basis to account for the incremental costs associated with the holiday pay at the double time rate for employees. The 49ers had previously approved similar requests for events held on January 1, 2017, and December 24, 2017. Public safety employees represented by the Police Officers Association (Unit 2) and International Association of Firefighters (Unit 2) already receive pay at the double time rate for NFL events held at the Levi’s Stadium.

On December 11, 2023, the 49ers provided notification that it would not support the one-time public safety cost increase to the public safety cost threshold for the December 25, 2023, Levi’s Stadium event.

DISCUSSION
In recognition that City employees will be scheduled to work at the Levi’s Stadium on Christmas Day, it is recommended that the City Manager be authorized to execute Side Letter agreements with the City of Santa Clara Printed on 12/15/2023Page 1 of 3
powered by Legistar™
23-1543 Agenda Date: 12/19/2023
City’s bargaining units to pay employees at the double time rate on a one-time basis. The double time rate would be authorized for pay only and not compensatory time off.

Subject to Council approval, the City Manager would execute Side Letter Agreements with the following bargaining units:
· Engineers of the City of Santa Clara (Unit 4)
· City of Santa Clara Employees’ Association (Unit 578) · American Federation of State, County and Municipal Employees, Local 101 (Unit 6) · Unclassified Police Management Association (Unit 9A)
· Unclassified Fire Management Employees (Unit 9B)
· Public Safety Non-Sworn Employees Association (Unit 10) Employees represented by Unit 9A and Unit 9B receive pay at 1.5 times the Step 5 Police Lieutenant (Job Code 645) salary rate, so it is recommended that the double time rate be provided at Step 5 of the Police Lieutenant (Job Code 645) salary rate, if required to work at the stadium on Christmas Day.

In addition, the City utilizes As-Needed (Temporary) employees to adequately staff the Levi’s Stadium events. It is recommended that these as-needed employees that are scheduled to work at the Levi’s Stadium on Christmas Day receive pay at the double time rate. The City Administration has reached out to CalPERS to determine if Retired Annuitants would be eligible to receive pay at the double time rate on a one-time basis for working on Christmas Day. The Administration received notification from CalPERS that this would not be compliant with post-retirement employment restrictions for retirees.

Therefore, Retired Annuitants who work the Levi’s Stadium event on Christmas day shall be ineligible to receive pay at the double time rate.

ENVIRONMENTAL REVIEW
The action being considered does not constitute a “project” within the meaning of the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15378(b)(5) in that it is a governmental organizational or administrative activity that will not result in direct or indirect changes in the environment.

FISCAL IMPACT
The additional cost of providing pay at the double time rate for employees that will be scheduled to work the Levi’s Stadium event on December 25, 2023, is projected to be approximately $110,000.

The incremental increase in cost is anticipated to be funded by the existing Departments’ overtime budgets. All public safety expenses will be billed to the San Francisco 49ers for payment per Stadium agreements and in compliance with Measure J.

Staff will continue to monitor the Departments’ budgets and bring forward a budget amendment at year-end, if necessary.

COORDINATION
City of Santa Clara Printed on 12/15/2023Page 2 of 3
powered by Legistar™
23-1543 Agenda Date: 12/19/2023
This report has been coordinated with the Finance Department and City Attorney’s Office.

PUBLIC CONTACT
Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the
public information desk at any City of Santa Clara public library.

RECOMMENDATION
Authorize the City Manager to execute Side Letter Agreements between the City of Santa Clara and Engineers of the City of Santa Clara, City of Santa Clara Employees’ Association, American Federation of State, County and Municipal Employees, Local 101, Unclassified Police Management Association, Unclassified Fire Management Employees, and Public Safety Non-Sworn Employees Association that provides pay at the double time rate for employees that are required to work at the Levi’s Stadium on December 25, 2023, and approve the double time rate of pay for As-Needed employees (excluding Retired Annuitants) that are scheduled to work at the Levi’s Stadium on December 25, 2023
Reviewed by: Aracely Azevedo, Director of Human Resources Approved by: Jovan D. Grogan, City Manager
City of Santa Clara Printed on 12/15/2023Page 3 of 3
powered by Legistar™
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-585 Agenda Date: 12/19/2023

REPORT TO COUNCIL

SUBJECT
Public Hearing: Actions on the Zoning Code Update Including: Adoption of an Addendum to the City’s General Plan EIR for the Zoning Code Update; Adoption of a Resolution for General Plan Text Amendments Related to the Zoning Code Update, Including the Removal of Manufacturing Limitations in the Low- and High-Intensity Office/R+D General Plan Designations, Allowing Medical Uses in the High-Intensity Office/R+D Designation, and Clarifying the Definition of Floor Area Ratio; and Waive First Reading and Introduce an Ordinance Amending Title 18 of the Santa Clara City Code Including Changes Recommended by the Planning Commission

COUNCIL PILLAR
Deliver and Enhance High-Quality Efficient Services and Infrastructure

BACKGROUND
The Community Development Department has been working with Mintier-Harnish, the City’s Zoning Code Update consultant, since late 2017 to prepare a comprehensive update to the City of Santa Clara Zoning Code as set forth in Santa Clara City Code Title 18 (Zoning Code) . This is the first comprehensive update of the current Zoning Code since it first came into effect in 1969. The goal of the Zoning Code Update process is to develop a more up-to-date, readable and relevant Zoning Code that better aligns with the City’s General Plan and which fully aligns with recent changes in State law.

Overarching goals of the Zoning Code Update include:
§ Simplification and modernization
§ Implementation of and consistency with the City’s General Plan § Creation of new mixed-use zoning districts for commercial corridors § Creation of new Office/R+D districts that support employment uses § Integrating Specific Plan zoning districts
§ Implementing specific actions called out in the City’s Housing Element § Integrating pro-housing changes as required by State law For a complete discussion of the streamlining changes made to the updated Zoning Code, see the September 20, 2023 report to Planning Commission, provided as Attachment 1. In addition to taking action on the updated Zoning Ordinance, Council is being asked to adopt changes to the General Plan to ensure that the polices of the General Plan and Zoning Ordinance are consistent.

The Zoning Code Update was presented to the Planning Commission at a publicly noticed meeting on September 20, 2023 and on November 15, 2023. At the conclusion of the public hearing on November 15, 2023, the Planning Commission unanimously voted to recommended approval of the City of Santa Clara Printed on 12/15/2023Page 1 of 6
powered by Legistar™
23-585 Agenda Date: 12/19/2023
project (7-0) with specified changes as discussed further in this report.

DISCUSSION
At the November 15, 2023 Planning Commission meeting, following the staff presentation, the Commission discussed the following topics:

Definitions relating to data centers. Members of the Commission discussed the zoning code terminology pertaining to data centers and asked to add the term “data warehouse” along with quantitative thresholds to differentiate between standalone data centers and ancillary data centers, which are meant to serve on-site customers appurtenant to a larger industrial or office use. The Commission requested both an area limitation and a power maximum for data centers to be considered “ancillary.”
Level of review for Data Centers. The Planning Commission expressed concerns regarding data centers including their bulky design, the noise levels from cooling systems and the power required.

The Planning Commission wanted to ensure that standalone data centers would be subject to review by the Planning Commission.

Accessory Dwelling Units (ADUs) in relation to short-term rental regulations. The Planning Commission expressed concern about ADUs being available for short-term rental, given the need for additional housing opportunities and given the potential for negative community impact from mismanaged short-term rentals.

Electric Fencing. A member of the public requested that electric fencing be permitted to provide additional security options for industrial properties. The Planning Commission then had an extensive discussion on whether to permit electrified fencing, currently not permissible in the Zoning Code.

Staff had prepared additional language for potential inclusion in the Zoning Code Update that would allow for such fencing. The Planning Commission included in their recommendation that the Zoning Code Update add this additional language to allow for electric fencing, subject to issuance of a Use Permit.

Planning Commission Recommendation
The Planning Commission unanimously adopted a resolution to recommend adoption of the Zoning Code Update, with the following changes:

1. Clarify the definition of “data center” so that it includes “data warehouses”

2. Add additional details on what constitutes “ancillary uses” in the High Intensity Office / Research & Development Area with respect to data centers. Take into account both square footage (either square footage or a percentage of the building area) and electrical demand.

3. In Table 2-12, change standalone data centers from a Permitted use to a Conditionally Permitted Use in the LO-RD, HO-RD, LI and HI zones. Ancillary data centers below the square foot and power thresholds would be Permitted.

4. Prohibit the use of Accessory Dwelling Units as short-term rentals.

5. Include the additional language permitting regulated electric fencing, subject to a conditional use permit
As electric fencing is already regulated by state law (Civil Code § 835), the Commission also asked staff to verify that the proposed language on monitored electric perimeter security fencing complied City of Santa Clara Printed on 12/15/2023Page 2 of 6
powered by Legistar™
23-585 Agenda Date: 12/19/2023
with Civil Code § 835. The City Attorney’s Office has now verified that it does.

As the Planning Commission recommendation included a request for staff to include both a building size requirement and power usage requirement for data center uses to be considered ancillary to another primary use, such as office or industrial uses, Planning staff coordinated with Silicon Valley Power (SVP) on the requested requirement. The proposed ordinance has been updated to define ancillary data centers as data centers that constitute no more than 20% of the building area on a site and that also have a maximum power usage of nine (9) or fewer megawatts. Greater than nine megawatt usage requires more electrical infrastructural support that needs to be provided by SVP and 20% of building square footage establishes a clear threshold for limiting the area of the use so the majority of the site is available for the primary use.

The Planning Commission’s recommendations have been incorporated into the proposed ordinance to adopt the Zoning Code Update.

Next Steps
All portions of the Zoning Code Update will take effect 30 days after the City Council’s second reading of the ordinance, with the exception of:
1) Short term rental regulations, which are proposed to take effect nine months afterwards to allow for communication with property owners to begin the new registration process proposed. 2) Non single-family provisions of Article 2 of the Zoning Code relating to specific zoning districts, as those Zoning Code provisions will only apply after the Council adopts the new Zoning Map, which will be brought to the Council early next year, as discussed below.

A separate action to update the Zoning Map is a necessary additional step. In addition to new names for many of the zones, new development standards and permissible uses will apply in most zoning districts, and so a formal remapping process is required. In locations where the remapping will result in an inconsistency with the existing General Plan land use designation, the Council will need to also adopt conforming amendments to the General Plan land use designations. Although charter cities were previously exempt from the requirement to maintain consistency between zoning ordinances and general plans, the legislature deleted this exemption in 2019. Moreover, recent changes to state housing laws limit the City’s ability to reduce the residential density of any parcel, and the City must ensure that neither the remapping nor the conforming general plan amendments will result in a net loss in residential development potential. Staff is working to complete this remapping process in the forthcoming weeks.

Following the adoption of the Zoning Code update, staff will hold outreach meetings on the adoption of the Zoning Map. The purpose of these meetings is to provide affected community members with information on the process for Zoning Map adoption, including the adoption of General Plan amendments to align the General Plan and Zoning with existing uses. As a part of outreach, the City will post the proposed General Plan land use diagram and Zoning Map for review and comment. The City will bring the Zoning Map and associated General Plan Amendments forward for hearing in the Spring of 2024.

City of Santa Clara Printed on 12/15/2023Page 3 of 6
powered by Legistar™
23-585 Agenda Date: 12/19/2023

ENVIRONMENTAL REVIEW
The City prepared an Addendum to the 2010-2035 General Plan Environmental Impact Report (EIR) (Attachment 6), which concluded that the proposed General Plan Amendments and adoption and implementation of the Zoning Code would not result in a substantial change to the General Plan that would require major revisions to the previous EIR; that there is no substantial change in circumstances as a result of modifications to the General Plan that would cause new or substantially more severe significant impacts; and, that there is no new information of substantial importance that identifies new or more intense significant impacts than those identified in the General Plan EIR.

FISCAL IMPACT
There is no fiscal impact to the City other than administrative staff time and consultant time involved in preparing the Zoning Code Update and this report.

COORDINATION
This item was coordinated with the City Attorney’s Office.

PUBLIC CONTACT
Community participation is a key part of the Zoning Code Update. In addition to a number of meetings with the Old Quad Neighborhood held on June 19, 2018, August 20, 2018, September 17, 2018, October 15, 2018, and December 3, 2018, staff organized community meetings with the general public on February 13 and 28, 2019 to discuss topics for change within the Zoning Code. The topics discussed with community members included the codification of elements of the City’s single- family design guidelines; the creation of new zoning districts to implement existing General Plan designations; possible changes to the number of parking spaces required for residential and non- residential uses; and regulation of short-term rentals, such as Airbnb. Community meetings to gain input on the topic of potential occupancy criteria in single family residences were held on April 29, May 16, and May 29, 2019. The May 16 and May 29 meetings were also live-streamed.

The City received over 500 responses to a community survey on the Zoning Code Update, which was released on June 20, 2019 and made available through July 12, 2019. The survey was announced on the City’s social media accounts, sent to interested parties through e-notify lists and posted on the City’s website.

The City posted the draft Zoning Code Update on the City website for public comment in May and June of 2022. The City received approximately 90 separate comments on the draft Zoning Code Update. Responses to the individual comments have been posted on the City’s website. The draft Zoning Code, with comments and City responses is included as Attachment 4. City staff have indicated in the response whether a comment has resulted in a change to the draft code.

The City Council held three joint study sessions with the Planning Commission in the summer and fall of 2019. Topics for the three study sessions included New Districts, Simplified Processes, Single- Family District Standards, and Placemaking; Safe Parking and Assisted Living; and Uses in Single- Family Districts and Short-Term Rental Regulations.

In addition to joint study sessions with the City Council, the Planning Commission held study sessions on the Zoning Code Update on August 22, 2018, September 5, 2018 and October 27, 2021.

The Planning Commission also held a study session specifically on parking and outdoor dining regulations on June 16, 2021.

City of Santa Clara Printed on 12/15/2023Page 4 of 6
powered by Legistar™
23-585 Agenda Date: 12/19/2023
The City has also held informational meetings with the various commissions and non-governmental organizations including the Old Quad Residents’ Association on February 10, 2021; The Historical Landmarks Commission on January 6, 2022; the Neighborhood-University Relations Committee on May 23, 2022; the Bicycle and Pedestrian Advisory Committee on August 22, 2022; and a meeting with the head of the Silicon Valley Central Chamber of Commerce on August 18, 2022.

Public contact was made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, email [email protected] <mailto:[email protected]> or at the
public information desk at any City of Santa Clara public library.

ALTERNATIVES

1. Do not adopt an addendum to the City’s General Plan EIR for the Zoning Code Update, and direct staff to perform additional environmental analysis.

2. Do not adopt the proposed General Plan text amendments and give staff direction to revise the Zoning code Update text accordingly.

3. Adopt the Zoning Code Update and give alternate direction to staff regarding preparing a Zoning Code map for future adoption.

4. Adopt the Zoning Code Update and include different deferral timing for the implementation of short-term rentals.

5. Adopt the Zoning Code Update, without the inclusion of additional language regarding monitored perimeter security fences.

RECOMMENDATION

1. Adopt an addendum to the City’s General Plan EIR for the Zoning Code Update.

2. Adopt a Resolution for General Plan Text Amendments related to the Zoning Code Update, including the removal of manufacturing limitations in the Low- and High-Intensity Office/R+D General Plan designations; allowing medical uses in the High-Intensity Office/R+D designation; and clarifying the definition of Floor Area Ratio.

3. Waive first reading and Introduce the Ordinance amending Title 18 of the Santa Clara City Code to implement the Zoning Code Update including changes as recommended by the Planning Commission. Direct staff to implement Articles 1 and 3-8 of the Zoning Code Update along with the single family provisions in Article 2, with the exception of Short-term Rental Regulations, Section

18.60.250 which is deferred for nine (9) months to develop a monitoring and compliance program.

Reviewed by: Andrew Crabtree, Director of Community Development Approved by: Jovan D. Grogan, City Manager

ATTACHMENTS

1. September 20, 2023 Report to Planning Commission on the Zoning Code Update

2. November 15, 2023 Report to Planning Commission on the Zoning Code Update

3. Draft Zoning Code with comments and responses
City of Santa Clara Printed on 12/15/2023Page 5 of 6
powered by Legistar™
23-585 Agenda Date: 12/19/2023

4. Draft Zoning Code (November 2023) weblink

5. Addendum to the 2010 General Plan EIR for the Zoning Code Update

6. Resolution adopting an addendum to the General Plan Update EIR

7. Resolution adopting General Plan text amendments related to the Zoning Code Update

8. Ordinance adopting the Zoning Code Update
City of Santa Clara Printed on 12/15/2023Page 6 of 6
powered by Legistar™
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
23-584 Agenda Date: 9/20/2023

REPORT TO PLANNING COMMISSION

SUBJECT
Study Session on the Zoning Code Update

BACKGROUND
The Community Development Department has been working since late 2017 with Mintier-Harnish, the City’s Zoning Code Update consultant, to prepare a comprehensive update to the City of Santa Clara Zoning Code. This is the first comprehensive update of the current Zoning Code since it first came into effect in 1969. The goal of the Zoning Code Update process is to develop a more up-to- date, readable and relevant Zoning Code that better aligns with the City’s General Plan and fully aligns with recent changes in State law.

Overarching goals of the Zoning Code Update include:
§ Simplification and modernization
§ Implementation of and consistency with the City’s General Plan § Creation of new mixed-use zoning districts for commercial corridors § Creation of new Office/R+D districts that support employment uses § Implementing specific actions called out in the City’s Housing Element § Integrating changes as required by State law

DISCUSSION
The following discussion summarizes the key changes and concepts being brought forward through the Zoning Code Update.

Organization of the Code
The draft updated Zoning Code has been organized and formatted for clarity and ease of use. One significant change in organizational structure is to move from a nested or cumulative approach to zoning districts to an organization where the contents of each zoning district is self-contained. In the 1969 Zoning Code, uses were listed out within each zoning district, and the zoning code was cumulative in nature, meaning that uses in less intense zoning districts were included by reference in the more intense districts of the same type. For example, all of the uses allowed in the CN Neighborhood Commercial district are also allowed in the CC Community Commercial zoning district, and the uses of both zoning districts are allowed in the CT Commercial Thoroughfare zoning district with each district referring back to the other districts for the complete list of allowed uses.

Functionally, this means that to understand the uses applicable to a property, a resident might need to follow a chain of references through three chapters of the Code.

The updated Zoning Code further improves readability by presenting all similar districts together in a single chapter, with uses presented in tabular format, making it easier to compare regulations between uses and zoning districts. Similarly, development standards, including building heights, City of Santa Clara Printed on 9/15/2023Page 1 of 9
powered by Legistar™
23-584 Agenda Date: 9/20/2023
setbacks and area limitations such as lot coverage maximums are presented in tables, allowing information to be readily accessed in a concise format.

The updated Zoning Code also adds explanatory graphics, helping to clarify code sections such as non-standard setback regulations and sign types. (See Attachment 1 for an example of the use tables, development standards and explanatory graphics.) New Mixed-Use Zoning Districts to Implement Existing General Plan Land Use Designations One significant advantage to the Zoning Code Update is that it will eliminate any remaining inconsistencies between the City’s General Plan and the Zoning Code. When the City completed the most recent comprehensive update of the General Plan in 2010, staff began a corresponding update to the Zoning Code to more fully align with the new General Plan, but this effort was not completed.

This lack of alignment limits the effectiveness of the Zoning Code as an implementation tool for the General Plan. Recent changes in State law also remove an exception for charter cities, such as Santa Clara, that allowed for inconsistency between zoning and General Plan. Other recent changes in State law also require that local land use regulations for residential and mixed-use developments be generally limited to objective standards, which are found in the Zoning Code. The Zoning Code Update will address these concerns.

Since 2010, the City’s General Plan designates areas for mixed-use development along the City’s commercial thoroughfares, but the current applicable zoning districts are limited to commercial uses.

As a result of the current lack of mixed-use zoning districts, mixed-use projects must be implemented using the more cumbersome, expensive and time-consuming Planned Development Zoning process.

The Zoning Code Update will add mixed-use zoning districts that directly align with the City’s General Plan land use designations, including new mixed-use districts for commercial corridors, such as El Camino Real, Homestead Road, and Saratoga Avenue.

The creation of mixed-use districts conforming to the General Plan will provide developers with a more streamlined approval process through a development review hearing using objective standards in the analysis of projects. The proposed designations for El Camino Real implement the existing General Plan land use designations including the MU-CC Mixed Use-Community Commercial zone, which corresponds to the CMU Community Mixed-Use land use designation, and the MU-RC Mixed Use-Regional Commercial zone, which corresponds to the RMU Regional Mixed-Use land use designation. Any future zoning changes that result from the El Camino Specific Plan, which is under development, would be adopted separately as part of the El Camino Real Specific Plan process.

New Industrial Zoning Districts to Better Reflect the Mix of Businesses that are Located in Santa Clara’s Job Centers
Similarly, most of the employment lands in North Santa Clara are zoned ML Light Industrial, a catch- all designation in the 1969 code, even though the General Plan designates these areas as a mix of Light Industrial, Low Intensity Office/Research & Development or High Intensity Office/Research & Development. Lands designated for Light and Heavy Industrial use are generally found within areas most impacted by the flight path of San José Mineta International Airport (SJC). The update maintains the Light and Heavy Industrial zoning districts in areas with those General Plan designations, especially near SJC, and creates new zoning designations for Low-Intensity Office/R+D (LO-RD) and High-Intensity Office/R+D (HI-RD) uses, recognizing that additional height and development intensity is now a part of the development program for contemporary office uses.

City of Santa Clara Printed on 9/15/2023Page 2 of 9
powered by Legistar™
23-584 Agenda Date: 9/20/2023
Additional Height Allowances for Industrial Uses with Fewer Employees The 1969 Zoning Code assumed that light industrial uses would be limited to low-rise development.

Increasingly, developers of modern industrial uses, such as data centers, seek to better utilize industrially zoned land. The City has granted modifications, variances, and PD zonings regarding height through the City’s permit process for these uses. This code change recognizes the contemporary needs for additional height of this development type which are compatible with surrounding forms of industrial development and therefore provides a more logical and streamlined development process.

Streamlined Permitting Processes for Placemaking Uses
In response to resident demand, the updated Zoning Code includes multiple changes to streamline the permitting of placemaking uses. The streamlined processes include an increased allowance for restaurants to provide up to 24 outdoor seats without a permit, as opposed to twelve as currently allowed, making it easier for restaurants to activate their adjacent outdoor spaces.

The code changes also include a streamlined administrative permit process for temporary outdoor events on private property, such as pumpkin patches and carnivals, as well as live entertainment, provided the entertainment use meets residential separation requirements, striking a balance between placemaking and neighborhood protection. These types of activities would be permitted with less time and cost through a streamlined staff review process rather than through City Council action as required by the current Zoning Code.

Simplified Parking Regulations
The parking section of the Zoning Code has been revised to base parking requirements on the floor area of a building, as opposed to requirements based on other criteria, such as number of seats. The parking requirements in the current Zoning Code can prevent an existing commercial space from being re-tenanted for a different commercial use. For example, the current Zoning Code requirements for restaurants based on the number of seats can effectively prevent a restaurant from entering a vacant commercial space. Implementing a consistent standard based on square footage makes for an apples-to-apples comparison of required parking between different uses such as restaurants and retail and makes it easier to re-tenant buildings. The updated Zoning Code also increases the thresholds for triggering additional parking requirements so that a wider range of tenants can use existing buildings, reducing the barriers to tenanting vacant commercial space and leading to livelier streets.

Additional changes are included to align with recent changes to State law, especially Assembly Bill (AB) 2097 (2022), which prohibits cities from requiring parking within one-half mile of a major transit stop. Attachment 2 shows the areas of the City where AB 2097 applies.

Construction Parking for Larger Projects
In response to an ongoing community concern, the updated Zoning Code adds requirements for off- street parking for the duration of construction of residential projects of over 100 units in size, or non- residential projects of over 100,000 square feet in area. Parking spaces will be required to be available from the time of issuance of building permits until the issuance of a certificate of occupancy.

The proposed code provisions include performance standards to maintain the temporary parking lot and to sweep surrounding streets.

Occupancy Limits for Residences
City of Santa Clara Printed on 9/15/2023Page 3 of 9
powered by Legistar™
23-584 Agenda Date: 9/20/2023
Staff has invested a significant amount of time exploring with the community potential regulations for the occupancy of single-family residences. In particular, this effort includes several years of community outreach through the Neighborhood University Relations Committee (NURC) and with residents of the Old Quad neighborhood. Because of the complexity of this issue and its importance to the community, staff will bring forward an ordinance addressing this topic separately, after the Zoning Code update has been completed. Staff will continue working with the community to make sure that the City’s approach is effective while remaining fully compliant with legal requirements.

As a first step to address this concern, the Zoning Code Update will require that in new or expanded residences, each residential unit maintain a minimum common area (the area dedicated to living rooms, family rooms and kitchens) of 25% of the floor area of the building, to provide adequate common space for congregating in the residences and to prevent dining rooms and living rooms from being converted to bedrooms.

Short-Term Rentals
A second area of significant community concern is the City’s current lack of regulations for short-term rental uses (the rental of a residence or a portion of a residence for 30 or fewer days). The proposed Zoning Code Update establishes regulations for short-term rentals, requiring the unit to be owner- occupied or significantly limiting the amount of time that the unit may be rented, and requiring the owner to register with the City, pay the Transient Occupancy Tax (TOT), and meet performance standards. The proposed regulations will establish a maximum number of days (90 aggregate days in a calendar year) that properties can be rented without the owner present, set occupancy limits and require a local contact person. As this is an evolving model, a Minor Use Permit, which enables the City to add conditions of approval and, if necessary, revoke approval, is proposed to be required for any proposal that deviates from the new Zoning Code short-term rental standards.

Increased Allowances for Houses with One-Car Garages
A number of subdivisions were built in Santa Clara in the 1950s with one-car garages and do not conform to the City’s current standard of two parking spaces per single-family residence. Prior to the 2010 General Plan update, the City had a General Plan policy that allowed expansions of these houses by up to 500 square feet before they were required to provide an additional garage space.

The Zoning Code Update will codify the ability to make up to a cumulative 1,000 square foot addition to such houses over the life of the building without the need to add a parking space. Any additions made previously will count towards the 1,000 square foot total.

By-Right Setback Exceptions
The proposed Zoning Code Update will add by-right exceptions for additions to houses with legal non -conforming side setbacks, provided the addition is to the rear. It has become a frequent practice for the City to grant Variances for such additions in consideration of a lack of any clear negative impact upon the community and the benefit to the homeowner. This change will thus reduce the number of variance cases in the City, especially in relation to pre-war houses in the Old Quad with narrower lots, reducing unnecessary time and cost burdens for homeowners.

Unenclosed Porch Allowances
The Zoning Code Update would also increase the amount that unenclosed porches can encroach into the front setback to up to six feet. This change aligns with current community preferences, reflecting the transition from a visual preference for large, uninterrupted front lawns to homes that are more inviting and pedestrian-oriented. Homeowners will be more able to add on an open front porch City of Santa Clara Printed on 9/15/2023Page 4 of 9
powered by Legistar™
23-584 Agenda Date: 9/20/2023
that could activate their front yard.

Prohibited Activities
The proposed Zoning Code Update adds language to clarify that residential front and side setbacks need to be free of inoperable vehicles, construction equipment and debris, and other potential attractive nuisances, such as unattended ping-pong tables and inflatable pools. This clarified code language will make it easier for the City to conduct Code Enforcement for non-compliant property owners.

One-and-a-Half Story Accessory Dwelling Units
Recent changes to State law require cities to allow 800 square foot Accessory Dwelling Units (ADUs) with four-foot side and rear yard setbacks. Cities are allowed to have more permissive development standards for ADU’s that go beyond these minimum requirements. In response to community input, particularly from the Old Quad neighborhood, the proposed update will include zoning standards that allow one-and-a-half story ADUs by right. This increased height is considered by the community to be consistent with the historical character of the Old Quad, and an appropriate means of allowing compatible development, as the volume of a half-story is largely underneath the pitch of the roof and use of the half-story reduces the mass of a structure with two habitable floor areas.

Proposed ADU maximum size standards would allow ADUs up to 1,200 square feet on lots which are 5,500 square feet or larger and a maximum of 1,000 square feet on lots less than 5,500 square feet in size. The proposed stratification of allowable ADU sizes based on lot size is a response to community concerns that 1,200 square foot ADUs appear to be crowding smaller lots with little room left for rear yard vegetation or separation between buildings.

Minor Use Permits
The Zoning Code Update will create a Minor Use Permit process to allow more streamlined review of non-controversial uses, such as licenses for beer and wine sales at a restaurant. In all instances, neighbors would be notified of the proposed minor use permit, but a public hearing would only be held if requested by a neighbor. Non-controversial permits would be approved by the Director of Community Development without a public hearing.

Zoning Code Changes Required by Recent State Legislation Over the past year, the State has made a number of changes to the Government Code that are intended to promote housing inventory including several actions cities are required to implement through their Zoning Codes. As a result, the City has made the following changes to the proposed Zoning Code Update since the release of the February 2022 draft:
- Allowing residential development on land with commercial land use designations (SB 6 and AB 2011), provided that the development meets specific conditions including a minimum density of 30 dwelling units per acre and paying prevailing wages during construction; - The relaxation of local ADU development standards to allow greater ADU heights near transit (SB 897), and waiving otherwise required front setbacks if a detached ADU of 800 square feet cannot be built (AB 2221);
- Increasing the range of projects that can take advantage of incentives in the Density Bonus Law, including shared housing (AB 682) and commercial projects that include an affordable housing component (AB 1551);
- A prohibition on parking requirements for residential and commercial developments within a half-mile of transit (AB 2097) and for 55-and-older senior housing projects (AB 2334); City of Santa Clara Printed on 9/15/2023Page 5 of 9
powered by Legistar™
23-584 Agenda Date: 9/20/2023
- Requirements to provide more possible zoning districts for emergency shelters, and to approve emergency shelters using objective standards (AB 2339); and - Prohibition on cities from requiring a public hearing for residential renovation projects that only involve interior reconfigurations (AB 916).

Summaries of these pieces of State legislation are presented in Attachment 3.

Changes Made as a Result of the Housing Element Update
Several changes are proposed for the Zoning Code Update to implement actions proposed in the Housing Element and/or directed by the State Department of Housing and Community Development (HCD) through the City’s Housing Element update process. Specific to the Zoning Code, the State has asked the City to support a wider variety of residential housing choices by allowing a wider variety of housing types in the City’s various residential zoning districts. This includes generally allowing Single Room Occupancies (SROs) and supportive housing (housing that includes supportive services) in multi-family and mixed-use zoning districts. HCD also asked that the City include low- barrier navigation centers as an enumerated use. Low-barrier navigation centers are functionally emergency shelters with additional supportive services.

General Plan Text Amendments
The Zoning Code Update includes an accompanying General Plan Amendment in response to a recent change to State law that requires charter cities to have consistent General Plans and Zoning Codes. This Amendment would update the mix of industrial areas supported by the General Plan to align with the Zoning Code update and the evolving nature of industrial activity within Santa Clara.

First, the General Plan changes would remove limitations on the maximum amount of building area devoted to manufacturing in the Low and High Intensity Office/R+D designations. This would allow both existing industrial businesses to continue in place and would allow for new businesses with a manufacturing component to locate in the new zoning designations that have not yet been applied to the City’s zoning map.

Second, the proposed changes would remove the prohibition on Medical Facilities in the areas designated High Intensity Office/R+D. This proposal reflects current practices within the medical industry, to include uses that both manufacture medical supplies or equipment and perform outpatient procedures, to locate both parts of their business within the same building.

Third, the proposed change would modify the definition of Floor Area Ratio (FAR), which is used to regulate building mass. The definition is being changed to clarify that FAR calculation is based on all of the building mass above grade, but excludes basements and below-grade parking.

Zoning Code Sections to be in Effect Prior to Map Approval Adoption of the Zoning Code is scheduled for City Council consideration in advance of the proposed adoption of a Zoning Map that would change the zoning at specific locations throughout the City where the current zoning does not align with the General Plan. This change would address the State requirement now applicable to charter cities for the Zoning and General Plan to align.

City of Santa Clara Printed on 9/15/2023Page 6 of 9
powered by Legistar™
23-584 Agenda Date: 9/20/2023
The majority of the proposed changes in the Zoning Code Update, which are zoning district-based, would not become effective until the time of the Zoning Map adoption. However, some elements that apply Citywide would take effect upon adoption of the Zoning Code. Changes that will be in effect in advance of the Zoning Map include: changes associated with single family districts, reduced parking requirements for many uses to simplify re-tenanting of vacant commercial; the Minor Use Permit process which simplifies permitting for many routine uses like the sale of beer and wine at restaurants; Zoning Clearances, which are a non-discretionary, over-the-counter permitting process; and the simplified Outdoor Seating and Entertainment Permit process.

Next Steps
The Zoning Code Update is being scheduled for the next Planning Commission meeting for the Commission to make a recommendation to the City Council. City Council consideration of the Zoning Code Update is scheduled to take place in November.

Following an adoption of the Zoning Code update by the City Council, staff will hold outreach meetings on the adoption of the Zoning Map. The purpose of these meetings is to provide affected community members with information on the process for Zoning Map adoption, including the adoption of General Plan Amendments to align the General Plan and Zoning with existing uses. As a part of outreach, the City will post the proposed General Plan land use diagram and Zoning Map for review and comment.

Following outreach, the City will bring the Zoning Map and associated General Plan Amendments forward for hearing in early 2024.

ENVIRONMENTAL REVIEW
Given that the Zoning Code Update is an implementation action of the 2010 General Plan Update, the City is preparing an Addendum to the 2010-2035 General Plan Environmental Impact Report (EIR) to cover adoption of the Code. The Addendum will indicate that the adoption of the Zoning Code Update will not result in environmental impacts beyond those described in the General Plan Update EIR.

FISCAL IMPACT
There is no fiscal impact associated with this action.

COORDINATION
This item was coordinated with the City Attorney’s Office.

PUBLIC CONTACT
Community participation is a key part of the Zoning Code Update. In addition to a number of meetings with the Old Quad Neighborhood held on June 19, 2018, August 20, 2018, September 17, 2018, October 15, 2018, and December 3, 2018, staff organized community meetings with the general public on February 13 and 28, 2019 to discuss topics for change within the Zoning Code. The topics discussed with community members included the codification of elements of the City’s single- family design guidelines; the creation of new zoning districts to implement existing General Plan designations; possible changes to the number of parking spaces required for residential and non- residential uses; and regulation of short-term rentals, such as Airbnb. Community meetings to gain input on the topic of potential occupancy criteria in single family residences were held on April 29, City of Santa Clara Printed on 9/15/2023Page 7 of 9
powered by Legistar™
23-584 Agenda Date: 9/20/2023
May 16, and May 29, 2019. The May 16 and May 29 meetings were also live-streamed.

The City received over 500 responses to a community survey on the Zoning Code Update, which was released on June 20, 2019 and made available through July 12, 2019. The survey was announced on the City’s social media accounts, sent to interested parties through e-notify lists and posted on the City’s website.

The City posted the draft Zoning Code Update on the City website for public comment in May and June of 2022. The City received approximately 90 separate comments on the draft Zoning Code Update. Responses to the individual comments have been posted on the City’s website. The draft Zoning Code, with comments and City responses is included as Attachment 4. City staff have indicated in the response whether a comment has resulted in a change to the draft code.

The City Council held three joint study sessions with the Planning Commission in the summer and fall of 2019. Topics for the three study sessions included New Districts, Simplified Processes, Single- Family District Standards, and Placemaking; Safe Parking and Assisted Living; and Uses in Single- Family Districts and Short-Term Rental Regulations.

In addition to joint study sessions with City Council, the Planning Commission held study sessions on the Zoning Code Update on August 22, 2018, September 5, 2018 and October 27, 2021. The Planning Commission also held a study session specifically on parking and outdoor dining regulations on June 16, 2021.

The City has also held informational meetings with the various commissions and non-governmental organizations including the Old Quad Residents’ Association on February 10, 2021; The Historical Landmarks Commission on January 6, 2022; the Neighborhood-University Relations Committee on May 23, 2022; the Bicycle and Pedestrian Advisory Committee on August 22, 2022; and a meeting with the head of the Silicon Valley Central Chamber of Commerce on August 18, 2022.

The City Council held a study session on the Zoning Code Update on August 22, 2023. The City Council and the public asked a number of questions on the Zoning Code Update at that study session.

AMAROK security fencing submitted a letter regarding the Zoning Code Update’s prohibition on electric fencing. Their letter is included as Attachment 6. On June 14, 2023, the Planning Commission heard and denied a Variance request from AMAROK for a 10-foot tall electric fence within the required front and side setbacks on an industrial property located at 1800 Duane Avenue.

Public contact was also made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.

RECOMMENDATION
Accept the information presented in the Study Session.

City of Santa Clara Printed on 9/15/2023Page 8 of 9
powered by Legistar™
23-584 Agenda Date: 9/20/2023
Prepared by: John Davidson Principal Planner, Community Development Reviewed by: Alexander Abbe, Assistant City Attorney
Approved by: Andrew Crabtree, Director of Community Development

ATTACHMENTS

1. Zoning Code example use tables and development standards

2. Map showing Major Transit Stops, with ½ mile buffers, per AB2097

3. Summary of recent changes to State law

4. Draft Zoning Code with comments and responses

5. Draft Zoning Code (June 2023) weblink

6. Letter from AMAROK security fencing
City of Santa Clara Printed on 9/15/2023Page 9 of 9
powered by Legistar™
Article 2 – Zones, Allowable Uses, and Development Standards Chapter 18.14 Public Review
Draft – Santa Clara Zoning Code, Title 18 June 2023 2-29 Table 2-8
Mixed Use Zones Allowed Uses and Permit Requirements
Mixed Use Zones
Permit Requirements
P
MUP
CUP
TUP
-
Allowed by Right
Minor Use Permit (Chapter 18.124)
Conditional Use Permit (Chapter 18.124)
Temporary Use Permit (Chapter 18.122)
Not allowed
Land Use
(see Article 8 for land use
definitions). MU-NC MU-CC MU-RC MU-VHD Additional Regulations Offices P P P P
Outdoor Dining and
Seating MUP MUP MUP MUP Section 18.60.140
Outdoor Displays and
Sales CUP CUP CUP CUP Section 18.60.150
Personal Services P P P P
Personal Services,
Restricted MUP MUP MUP MUP Section 18.60.170
Restaurants P P P P
Retail Establishments:

General, Small
Format P P P P
General, Medium
Format P MUP P MUP
General, Large
Format CUP - CUP CUP
Veterinary Facilities P P P MUP Section 18.14.040
Vehicle Oriented Uses
Vehicle Service
Stations - CUP CUP -
Vehicle Rental
Facilities, Limited MUP - - -
Vehicle Rental
Facilities, Office Only P - - -
Vehicle Repair
Facilities, Minor MUP - - - Section 18.14.040
Section 18.60.200
Industrial, Manufacturing, and Processing Uses
Printing and Publishing
Facilities P P P P
Wineries, Distilleries,
Breweries, and Micro-
Breweries

MUP MUP MUP MUP

18.14.030 – Mixed Use Development Standards
A. Table 2-9 Mixed-Use Zone Development Standards. The intent of the mixed-use zone development standards table is to clearly and pr ecisely establish the basic site and structure regulations that apply to all developments in each of the mixed-use zones. The table also indicates where additional site and structure requirements, including, but not limited to, off-street parking, landscaping, signage, fences and obstructions, and performance standards, apply to mixed-use zones.

B. Density. Maximum density standards shall be consistent with the General Plan or applicable Master Plan, Specific Plan, or Area Plan.

C. Zoning Map. The boundaries, designations, and locations of the zones established by this Zoning Code shall be shown upon the map(s) entitled "Zoning Map for City of Santa Clara " and referred Attachment 1. Zoning Code example use tables and development standards Chapter 18.14 Mixed Use Zones

2-30 June 2023 Public Review Draft – Santa Clara Zoning Code, Title 18

to in this Zoning Code as the Zoning Map. Any additional maps adopted shall also be a part of this Zoning Code by reference. This Zoning Code, together with the Zoning Map, is hereby adopted in compliance with current State planning, zoning, and development laws. Changes in the boundaries of any identified zones shall be made by ordi nance in compliance with Chapter 18.142 (Amendments).

Table 2-9
Mixed-Use Zone Development Standards

Development
Feature
(minimum unless
otherwise indicated)
MU-NC MU-CC MU-RC MU_VHD Additional Regulations
Parcel Area - area required for each NEWLY CREATED parcel.

Parcel Area (min) None None None None

Street
Frontage (feet) None None 100 None
Density (where residential is proposed)
Minimum Density
(units/acre) 19 20 37 50
Maximum Density
(units/acre) 36 36 50 120
Setbacks -Setback lines are measured in feet, from the back of walk.

Front setback
(min/max) 0 0* or 5
10 0* or 5
10 None
Section 18.14.040(A)
Section 18.30.050
*Can be reduced to 0 feet if the total area is
less than 20 feet

Front setback
for other
ground floor
uses (min/max)
0 10/15 10/15 None
Side, Corner 0 0 0 None Section 18.14.040(J)
Section 18.30.050

Side, Interior
(adjacent to R1
and R2 zones)
10 10 10 None Section 18.14.040(J)
Section 18.30.050

Side, Interior
(adjacent to all
other zones)
None None None None Section 18.14.040(J)
Section 18.30.050

Article 2 – Zones, Allowable Uses, and Development Standards Chapter 18.14

Public Review Draft – Santa Clara Zoning Code, Title 18 June 2023 2-31

Table 2-9
Mixed-Use Zone Development Standards

Development
Feature
(minimum unless
otherwise indicated)
MU-NC MU-CC MU-RC MU_VHD Additional Regulations

Rear, Single-
Story (adjacent
to R1 and R2
zones)
10 10 10 None Section 18.30.050

Rear (adjacent
to all other
zones)
10 10 10 None

Rear, Multi-
Story (adjacent
to R1 and R2
zones)
15 15 15 None
Height (maximum) measured in feet

Height (within
20 feet of the
R1 and R2
zones)
32 32 32
None,
limited by
FAA
restrictions
Section 18.30.040

Height (all
other zones) 32 40 60
None,
limited by
FAA
restrictions
Section 18.30.040
Maximum Number of
Stories 3 4 6
None,
limited by
FAA
restrictions

Commercial Floor Area Ratio (FAR)
Minimum Floor Area
Ratio (FAR) None None 0.2 None Section 18.14.040
Additional Regulations
Residential Accessory
Structures Chapter 18.32
Basements Section 18.30.070
Density Bonus and
Affordable Housing Chapter 18.64
Fences, Walls, Hedges,
and Screens Chapter 18.34

0 1 0.5
Miles
¯
Tasman Drive
Tasman Drive
El Camino Real
El Camino Real
Legend
Transit Priority Areas
Operational Boundary
Santa Clara
T
ransit Priority Areas
Stevens Creek Boulevard Stev ens Creek Boulevard
f- -
c::.•
la "'!!"tM::JiD~
r1
Ld k , 1.:1v 11 Dr
C: ..
!:2 ..
1 ,-· I
I
I
I
I
•• ... ~ .....

I .
r-
r e;:
5l11
Ek• I
Co u I --
-,
I
J
llid, - n
W1kox
e m r1La"'
ho 1
S ntn Clar
/
,'IJ
n fi II "
Attachment 3. State Legislation Enacted in 2022 That Prompted Revisions to the Zoning Code Update

Since the release of the draft zoning code update in February 2022, the State Legislature has enacted a series of laws related to residential development. The following is a list of those bills, and how the Zoning Code Update has been modified to respond to the bills.

AB 916 – Interior Reconfigurations

Under AB 916, local jurisdictions cannot require a public hearing for interior reconfigurations of bedrooms within an existing residential structure, provided that the resulting reconfiguration results in no more than two additional bedrooms and that the reconfiguration does not expand the building envelope. This change has been added to the Architectural Review Section of the code as a permit approval not requiring a public hearing (Code Section 18.120.030, Minor changes by Director).

AB 2011 – Housing and High Road Jobs Act
SB 6 – Middle Class Housing Act

AB 2011 and SB 6 are intended to permit residential development at a minimum density of 30 du/ac on sites currently zoned and designated for commercial or retail uses. Both bills were signed into law by Governor Gavin Newson on September 29, 2022 and went into effect on July 1, 2023.

AB 2011 creates a CEQA-exempt, ministerial approval process for multifamily housing developments on sites within a zone where office, retail or parking are the principally permitted use. The law provides for slightly different qualifying criteria depending upon whether the project is (1) for 100-percent affordable projects or (2) for mixed-income projects located in "commercial corridors." AB 2011 projects must pay prevailing wages to construction workers, among other labor standards.

Under SB 6, project approvals remain discretionary and subject to the California Environmental Quality Act. Projects would be subject to the objective standards of the Architectural Review process with development permits issued at a Development Review Hearing. SB 6 projects would be subject to prevailing wage requirements and require a skilled and trained workforce.

Notably, SB 6 does not require that any of the units in the proposed housing project be affordable, except to satisfy the City’s inclusionary housing requirement.

Residential uses have been added to Table 2-5, the commercial districts use table, and additional regulatory language mirroring AB 2011 and SB 6 has been added to Section

18.12.040 of the Zoning Code.

SB 897 – Maximum ADU heights

Previously under state law, local jurisdictions were required to allow ADUs to be at least one story and 16 feet in height.

This change to state law requires that the lowest height limitation that may be imposed by a local agency on an accessory dwelling unit is 18 feet if the accessory dwelling unit is within 1/2 mile walking distance of a major transit stop or a high-quality transit corridor, or if the accessory dwelling unit is detached and on a lot that has an existing multifamily, multistory dwelling. The change also increases the lowest maximum height limit that may be imposed by the City on an accessory dwelling unit to 25 feet if the accessory dwelling unit is attached to a primary dwelling. The City is proposing a 1 ½ -story, 25’ height limit for detached ADUs and a 2- story, 25’ height limit for attached ADUs. Those changes are reflected in Section 18.60.030, ADUs, of the Zoning Code Update.

AB 2221 – ADU Procedures

This change to state law specifies that an accessory dwelling unit that is detached from the proposed or existing primary dwelling may include a detached garage.

The change also requires cities to waive the requirement for a front setback if the required setback would prevent a property owner from building an ADU of at least 800 square feet in size.

If the City denies an application for an accessory dwelling unit or junior accessory dwelling unit, the City is required to return in writing a full set of comments to the applicant with a list of items that are defective or defic ient and a description of how the application can be remedied by the applicant within 30 days of the denial.

AB 2334 – Density Bonus standards

This change to state law gives new direction where the density allowed in the zoning ordinance is inconsistent with that allowed in the land use element of the general plan or specific plan. Under the adopted change to state law, the greater density prevails. Relevant language has been added to Chapter 18.02 of Article 1 of the Zoning Code, Purpose and Applicability of the Zoning Code.

This bill would also prohibit the imposition of any vehicular parking standards if a development is for a project for seniors 55-and-up. (Previously, this only applied to 62 -and-up developments.) The provisions for parking relief h ave been added to Section 18.64, Density Bonus of the proposed Zoning Code update.

AB 1551 – Density Bonuses for Mixed Use

This change to state law requires cities to grant a commercial developer a development bonus, when an applicant for approval of a commercial development had entered into an agreement for partnered housing with an affordable housing developer to contribute affordable housing through a joint project or two separate projects encompassing affordable housing. Development bouses available to commercial developers include a 20% increase in the overall height of a project, a 20% increase in the maximum allowed FAR, a 20% increase in the maximum height of a project or a 20% reduction in the required parking for a commercial project. These provisions have been added as a new code section (18.64.130) as a part of the Density Bonus provisions.

AB 682 – Density Bonuses for Shared Housing
This change to state law allows shared housing projects to be eligible for density bonuses.

Under this new law, a “shared housing unit” is one or more habitable rooms, not within another dwelling unit, that includes a bathroom, sink, refrigerator, and microwave. A “shared housing building” is a structure with five or more shared housing units and one or more common kitchens and dining areas. The term “shared housing” is now defined in Article 8 of the Zoning Code, and shared housing is now included as an eligible type of development in the Density Bonus Chapter of the Code (Chapter 18.64).

The change to state law also prohibits cities from requiring any minimum unit size requirements or minimum bedroom requirements in conflict with the bill’s provisions with respect to a shared housing building eligible for a density bonus.

AB 2097 – No Parking near Transit
This change to state law prohibits public agencies from imposing any minimum automobile parking requirement on any residential, commercial, or other development project that is located within 1/2 mile of public transit, unless the City makes written findings that not imposing parking requirements would have a substantially negative impact on the city’s ability to meet its share of specified housing needs.

AB 2339 – Emergency Shelters

Existing law requires local governments to plan for emergency shelters in their housing elements.

AB 2339 provides that the sites identified for emergency shelters must be in residential areas or otherwise suitable zones, thus prohibiting local governments from situating shelters in industrial zones or other areas disconnected from services. The law also seeks to ease constraints on the development of emergency shelters by requiring that any development standards applied to emergency shelters be objective.

Under the current zoning code, emergency shelters are a permitted use in the ML Light Industrial zoning district, provided that the city has fewer beds than homeless residents during the most recent homeless count of people residing within the city. Additional emergency shelters beyond the number needed as indicated by the most recent homeless census can be allowed subject to a Conditional Use Permit.

Under the proposed zoning code update, emergency shelters are a permitted use in the R3, R4, and R5 residential zoning districts, along with the C-C Community Commercial and C-R Regional Commercial districts and the MU-VHD mixed use district. Emergency shelters are also allowed in the LI Light Industrial zoning district subject to the approval of a Conditional Use Permit approved by the Planning Commission.

The standards applicable to Emergency Shelters have been reworked to include only objective standards, per the changes required by AB 2339.

Justification for Electrified Security Fencing
City of Santa Clara

AMAROK. LLC respectfully requests reconsideration and removal of “electrified fences” as a prohibited material in the proposed Zoning Code Update section 18.34.060 – Materials and Maintenance (inserted below). To summarily ban this effective perimeter security solution citywide would be a disservice for certain local businesses that have been targeted with ongoing criminal trespass, property crime, and/or threats to employees.

AMAROK is a perimeter security provider serving over 6000 small businesses to Fortune 50 companies nationwide. There are more than 600 electrified security fence installations across California, including dozens of businesses throughout the Greater Bay Area (San Jose, Gilroy, Oakland, San Francisco, etc.) being secured by this technology. Our system is designed to secure businesses’ property and assets in Industrial, Commercial and Manufacturing zones by providing monitored intrusion protection around the perimeter of the property.

This perimeter security technology consists of a short-pulsed, monitored perimeter alarm system fence which conforms with international (IEC 60335-2-76), national (ANSI/ASTM), and State of CA (Civil Code Section 835) installation and safety standards. T he technology has been safety tested and certified by Nationally Recognized Testing Laboratories (NRTL) SGS and TUV. The integral component of this alarm system is a low voltage, battery-powered securi ty fence placed approximat ely 4”-8” inside of a property’s existing perimeter fence/barrier. The syst em is comprised of thin, widely spaced wires (6-8 inches apart) which run horizontally to the height of 10’. The securi ty system is entirely within the property and behind an existing perimeter fence – it does not serve as a perimeter boundary or barrier.

18.34.060- Materials and Maintenance
A. Graffiti Resistance. Graffiti.res istant aesthetic surface treatment shan be required for all fences and walls adjacent to a public right-Of-way, or as determined though the Site Plan and Design Review (Chapter 18.120) process .
8 . Fences and wall in Indust rial and Office Zones.

1. Storage Area allowable fence and wall material. Within the Industrial-Heavy category , storage area screening may include masonry or concrete, metal, or chain-link fencing with wood or vinyl slats.
2 . Security fences and walls. Within all industrial and office zones except Industrial-Heavy, all fencing, or walls shall be wrough t iron , concrete , masonry , or other similar materials not to exceed a height of eight feet from the highest finished grade . Chain-link fencing may be used in areas not visible from public rights-of-way .

C. Maintenance . Fences, wans, and screens shall be continuously maintained in an order1y and good condition and shaO always be kept free of graffiti .

D. Pro hibited Fence, Wall , and Screen Mate rials. The following materials and fence types are prohibited:
1, Barbed Wire

2. Razor Wire

3. Electrified fences

4. Use of grease
,S, Broken glass or other sharp materials
550 Assembly St, Suite 500 / / Columbia, SC 29201 // 1-800-432-6391 II www.amarok.com

As with most monitored alarm systems, an audible alarm sounds when the fence line is breached by a trespasser. In the event of an alarm, a signal will be sent to our monitoring station, who in turn, contacts the business to let them know they had an alarm event. After verifying, the alarm can be silenced by the business or set to automatically shut off after a determined amount of time. Our system does not directly connect to emergency services, but a response may be requested if an alarm event is verified.

HISTORY:

There is an existing permitted security fence loca ted at 530 Aldo Avenue. The security fence was approved to be installed at 10’ inside of the existing chain link fence with slats. The site is zoned Light Industrial. The permit was issued January 17
th, 2023.

SAFETY BENEFITS:

The security system is not detrimental to the health, safety, morals or welfare of persons residing or working in the area. It is insta lled completely inside the existing perimeter fence and therefore not exposed to the public. To come in contact with the AMAROK security system, a criminal would have to be intentionally trespassing by, first, disregarding the warning signs and then breaking through or scaling the existing perimeter barrier.

The proposed security system enhances the health, safety, and welfare of persons by improving workplace safety and discouraging criminals from targeting the subject property and committing other crimes of opportunity in the neighborhood.

The utilization of the proposed security system will not be detrimental to the public welfare, nor injurious to property or improvements in the neighborhood. Instead, the safety and general welfare of the neighborhood is enhanced through crime prevention. The result is that the City can redirect law enforcement time and resources toward crimes other than trespass and property crime.

The security system is the most reliable, econo mical, and effective perimeter security application available. The installation of the system will secure the property, increase the security of the surrounding properties and the immediate area by deterring the criminal element from targeting the area.

SUSTAINABLE SECURITY TECHNOLOGY:

This security technology supports environmental su stainability. It is not powered by mains/grid power and is not compromised by power failures.

The system is solely powered by a 12-volt DC ba ttery that is perpetually recharged by solar energy/panels.

VISUAL AESTHETICS:

550 Assembly St, Suite 500 II Columbia, SC 29201 // 1-800-432-6391 // www.amarok.com

The security system is visually transparent, allowing the site to maintain viewshed into the property while also securing the property from would-be criminals.

Currently, City regulations do not permit a fence of 10’ height within designated setbacks. This height is required for the efficacy of the proposed electrified security fence, which is located inside of the existing perimeter barrier by 4”-8” (not affixed to the perimeter fence / wall). The additional height above the perimeter barrier prevents the perpetrators from simply scaling both the perimeter fence (or wall) and 550 Assembly St, Suite 500 / / Columbia, SC 29201 // 1-800-432-6391 II www.amarok.com

electrified security fence. This design configuration is essential and a significant deterrent for the criminal trespasser.

PUBLIC SAFETY:

Safety and security are essential to quality of life in a community.

As stated in the General Plan section 5.9.3, crim e and disorder in neighborhoods, parks, and business districts cause citizen frustration, uneasiness, and fear.

The electrified, perimeter security fence prov ides an affordable and effective means to secure businesses’ assets and their workplaces/employees. In turn, this allows them to invest financial resources in further growth, resulting in continued employment and an increased tax base for the community. With the growing threat of extensive t heft and loss history, businesses have been urgently requesting this security technology to prevent ongoing property crime and remain a viable business for the community.

The security system does not adversely affect th e health, safety, peace, morals, comfort or general welfare of persons residing or working in the vicinity of the property and will not be materially detrimental to the public welfare of injurious to property or improvements in the City. Instead, the system contributes to public safety and helps deter crime at a secured property and the surrounding neighborhood.

ALARM REGULATIONS:

FAQ: WHY MUST OUR FENCE BE TALLER?
It's the difference between this .. . And this ...
'·
550 Assembly St, Suite 500 / / Columbia, SC 29201 // 1-800-432-6391 II www.amarok.com

As with most monitored alarm system s, a sound is emitted if the security fence is tampered with or breached by a criminal trespasser. A signal is se nt to our 24-hour monitoring station, who then communicates with the business contact to advise them they had an alarm event. Once the business contact has verified a trespassing attempt or breach has taken place, our monitoring staff will then contact local PD to be dispatched to the site. T he audible alarm can be silenced remotely by business contact, or it can be set to shut off automatically after a predetermined amount of time. The system itself does not directly connect to emergency services, t hereby preventing false alarms sent to local first responders.

For these reasons, many jurisdictions permit us an alarm system via an alarm permit through the police department, which complies with Chapter 8.05 SCCC Alarm Systems.

COLLABORATION TO CODIFY AND PERMIT ELECTRIFIED SECURITY FENCING

In summary, we respectfully request that the City of Santa Clara work with AMAROK to codify the allowance of electrified security fencing for commer cial businesses residing in appropriate zones.

Included with this request are a model ordinance and a copy of the City of Gilroy’s municipal code for electrified security fences.

Local businesses in Santa Clara have been requesting this security solution and, as such, we look forward to the City’s openness to helping local businesses address their property crime issues.

Thank you for your time and reconsideration. We look forward to your response and an opportunity to have further discussion on this matter. Much appreciated!

Keith Kaneko
Director, Government Relations

AMAROK, LLC
Mobile: (916) 532-6012
[email protected]
www.AMAROK.com

Hannah Robinson
Compliance Manager

AMAROK, LLC
Cell: 803-920-9628
[email protected]
www.AMAROK.com

~ ~

AMAROK AMAROK
ULTIMATE PERIMETER SECURITY UlTIMATE PERIMETER SECURITY 550 Assembly St, Suite 500 II Columbia, SC 29201 // 1-800-432-6391 // www.amarok.com City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
22-1207 Agenda Date: 11/15/2023

REPORT TO PLANNING COMMISSION

SUBJECT
Public Hearing on the Recommendation to Adopt the Comprehensive Zoning Code Update (Second Meeting)

BACKGROUND
The Community Development Department has been working since late 2017 with Mintier-Harnish, the City’s Zoning Code Update consultant, to prepare a comprehensive update to the City of Santa Clara Zoning Code. This is the first comprehensive update of the current Zoning Code since it first came into effect in 1969. The goal of the Zoning Code Update process is to develop a more up-to- date, readable and relevant Zoning Code that better aligns with the City’s General Plan and fully aligns with recent changes in State law.

DISCUSSION
At the September 20, 2023 Planning Commission Study Session, staff described the format and organization of the Zoning Code Update, presented major streamlining changes to the Code, and answered Commission questions.

At the November 15, 2023 Planning Commission hearing, staff will provide additional information on the proposed Zoning Code Update, including sections that address recent changes to State Law and additional changes based on direction given by the State to the City through the City’s Housing Element update effort. The applicable State laws are described in the September 20, 2023 Planning Commission staff report, which is included as Attachment 1. Staff will also describe required General Plan text amendments necessary to support the Zoning Code Update and the Zoning Map approval process. Those are also described in the September 20, 2023 staff report, which is included as Attachment 1.

One consideration discussed at the October 11 Study Session on the Zoning Code Update was a possible allowance for electric security fences in industrial districts. One community member advocated that such fences should be allowed to improve security. Staff have provided potential Code language that could be added to the Zoning Code Update should the Planning Commission support the idea of allowing electric security fences in industrial districts (Attachment 6).

Staff however does not support this change, as allowances for electric fences would not be consistent with the general goals for the City’s continued improvement. The electric security fences recently considered by the Planning Commission (see File #23-544) are 10 feet in height and are installed behind a perimeter wall or fence 8 feet in height. By allowing electric security fences 10 feet in height, the City would be offering the wrong visual cues regarding safety in industrial districts and would diminish the City’s sense of place.

Staff also finds that electric fences are inconsistent with the General Plan Major Strategy to Enhance City of Santa Clara Printed on 11/9/2023Page 1 of 3
powered by Legistar™
22-1207 Agenda Date: 11/15/2023
City Identity. That major strategy states, “City identity is an important aspect of community living. It is expressed through the street design, architecture, landscaping and signage. The resulting visual composite plays a significant role in the sense of place.” Electric fences would detract from the more orderly and esthetically improved urban environment that is normally advanced through the redevelopment of older properties.

Additionally, as a part of the development review process, the Police Department reviews projects using the principles of Crime Prevention Through Environmental Design (CPTED), which is a multi- disciplinary approach of crime prevention that uses urban and architectural design and the management of built and natural environments. CPTED strategies aim to reduce victimization, deter offender decisions that precede criminal acts, and build a sense of community among inhabitants.

Police Department staff have indicated that electric fences are not a strategy supported by CPTED.

ENVIRONMENTAL REVIEW
Given that the Zoning Code Update is an implementation action of the 2010 General Plan Update, the City is preparing an Addendum to the 2010-2035 General Plan Environmental Impact Report (EIR) to cover adoption of the Code. The Addendum will indicate that the adoption of the Zoning Code Update will not result in environmental impacts beyond those described in the General Plan Update EIR.

FISCAL IMPACT
Adoption of the Zoning Code Update would include the creation of regulations around short-term rentals, which would be obligated to pay Transient Occupancy Tax (TOT) as a condition of operation.

These new regulations on short-term rentals would also require additional staff resources to monitor compliance. A future budget amendment is anticipated for the City Council to consider the hiring of a contractor to monitor compliance with short-term rental regulations.

COORDINATION
This item was coordinated with the City Attorney’s Office.

PUBLIC CONTACT
See the September 20 report (Attachment 1) for a full description of public outreach activities during the development of the Zoning Code Update.

Public contact was also made by posting the Council agenda on the City’s official-notice bulletin board outside City Hall Council Chambers. A complete agenda packet is available on the City’s website and in the City Clerk’s Office at least 72 hours prior to a Regular Meeting and 24 hours prior to a Special Meeting. A hard copy of any agenda report may be requested by contacting the City Clerk’s Office at (408) 615-2220, [email protected] <mailto:[email protected]> or at the public information desk at any City of Santa Clara public library.

ALTERNATIVES

1. Provide an alternate recommendation to the City Council regarding an addendum to the City’s General Plan EIR for the Zoning Code Update

2. Provide an alternate recommendation to the City Council than adopting the General Plan Text Amendments related to the Zoning Code Update, including the removal of manufacturing limitations in the Low- and High-Intensity Office/R+D General Plan designations; allowing City of Santa Clara Printed on 11/9/2023Page 2 of 3
powered by Legistar™
22-1207 Agenda Date: 11/15/2023
medical uses in the High-Intensity Office/R+D designation; and clarifying the definition of Floor Area Ratio.

3. Provide an alternate recommendation to the City Council than adopting the Zoning Code Update, and give alternate direction to staff regarding preparing a Zoning Code map for future adoption

4. Provide an alternate recommendation to the City Council than recommending that selected sections of the Code go into effect prior to the adoption of a zoning Map, including changes associated with single family districts; reduced parking requirements; the Minor Use Permit process; Zoning Clearances; the simplified Outdoor Seating and Entertainment Permit process; and short-term rental regulations, subject to a nine-month grace period.

5. Provide an alternate recommendation to City Council to adopt the Zoning Code Update, with the inclusion of additional language regarding monitored perimeter security fences.

RECOMMENDATION

1. Recommend that the City Council adopt an addendum to the City’s General Plan EIR for the Zoning Code Update, which is the primary implementation tool of the General Plan

2. Adopt a Resolution recommending that the City Council adopt General Plan Text Amendments related to the Zoning Code Update, including the removal of manufacturing limitations in the Low- and High-Intensity Office/R+D General Plan designations; allowing medical uses in the High-Intensity Office/R+D designation; and clarifying the definition of Floor Area Ratio.

3. Adopt a Resolution recommending that the City Council adopt the Zoning Code Update and give direction to staff to prepare a Zoning Code map for future adoption, and further recommending that selected sections of the Code be in effect prior to the adoption of a zoning Map, including changes associated with single family districts; reduced parking requirements; the Minor Use Permit process; Zoning Clearances; the simplified Outdoor Seating and Entertainment Permit process; and short-term rental regulations, subject to a nine-month grace period Prepared by: John Davidson Principal Planner, Community Development Reviewed by: Alexander Abbe, Assistant City Attorney
Approved by: Andrew Crabtree, Director of Community Development

ATTACHMENTS

1. September 20, 2023 Report to Planning Commission on the Zoning Code Update

2. Draft Zoning Code with comments and responses

3. Draft Zoning Code (November 2023) weblink

4. Resolution recommending adoption of General Plan text amendments related to the Zoning Code Update

5. Resolution recommending adoption of the Zoning Code Update

6. Report to Planning Commission on a monitored perimeter security fence, File No. 23-544

7. Alternate Resolution including code language regarding monitored perimeter security fences City of Santa Clara Printed on 11/9/2023Page 3 of 3
powered by Legistar™
Draft Zoning Code (November 2023) weblink

https://www.santaclaraca.gov/home/showpublisheddocument/82067/638331474614870000

This document is available in Community Development/Planning Division for review Resolution/Zoning Code update addendum Page 1 of 4
Rev: 7/27/2023

RESOLUTION NO. _____

A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA

TO ADOPT AN ADDENDUM TO THE GENERAL PLAN

ENVIRONMENTAL IMPACT REPORT, FOR ADOPTION OF THE

ZONING CODE UPDATE

SCH # 2008092005
PLN23-XXXXX (Zoning Code Update, General Text Amendments, and Addendum to the General Plan EIR)

WHEREAS, the City of Santa Clara (the “City”) is contemplating the adoption of the City’s Zoning Code Update, the first comprehensive update of the Code in over 50 years; and WHEREAS, the 2010-2035 General Plan is the City’s vision for future development; and WHEREAS, the General Plan also i ncludes r egulatory elements that channel and constrain development, includ ing limitations o n the amou nt of land area that can be de dicated to manufacturing uses within certa in industrial designations ; prohibitions on specific uses within industrial designations; and definitions that assist in regulating land use, including the definition of Floor Area Ratio (FAR), which describes the bulk of a building; and WHEREAS, under Government Code Section 65860, the General Plan and Zoning Ordinance of a jurisdiction are required to be consistent with each other; and WHEREAS, the City desires to remove the area limitation on manufacturing in the Low- and High- Intensity Office/R&D districts to allow for use mixes that reflect the current industrial office market, and are also reflective of the existing uses of buildings in North Santa Clara; and WHEREAS, new combinations of uses ar e being proposed, including man ufacturing of medical devices and outpatient procedures involving those devices; and WHEREAS, the City wishes to clarify the definition of Floor Area Ratio to better regulate the bulk of a building by including the area of a building dedicated to parking and by not including the area of a building below grade in the calculation of FAR; and
WHEREAS, the City held seven community meetings in 2018 and 2019 on the Zoning Code Update to solicit community feedback; received 500 responses to a community survey on the Zoning Code Resolution/Zoning Code update addendum Page 2 of 4
Rev: 7/27/2023

Update in 2019; and posted a copy of the draft code for public comment in 2022; WHEREAS, the City Council and P lanning Commission held three joint study sessions on the Zoning Code Update in the summer and fall of 2019; and
WHEREAS, the Planning Commission held study sessions on the Zoning Code Update on August 22, 2018, September 5, 2018, October 27, 2021, and September 20, 2023, and also held a study session specifically on parking and outdoor dining regulations on June 16, 2021; and WHEREAS, the City Council held a study session on the Zoning Code Update on August 22, 2023; and
WHEREAS, on November 16, 2010, the City Council certified the Final Environmental Impact Report for the 2010-2035 General Plan (the “General Plan EIR”); WHEREAS, the General Plan EIR included an analysis of the adoption of a zoning code that would be consistent with and implement the General Plan;
WHEREAS, on November 29, 2016, November 13, 2018, March 22, 2022, and June 7, 2022, the City Council certified Environmental Impa ct R eports for the Lawrence Station Area Plan , the Tasman East Specific Plan, the Patrick Henry Drive Specific Plan, and the Freedom Circle Future Focus Area, respectively (collectively, the “Subsequent EIRs”); WHEREAS, the City prepared an Addendum that tiers off the General Plan EIR and Subsequent EIRs and analyzes the potential impacts of the proposed Zoning Code Update (the “Addendum to the General Plan EIR”);
WHEREAS, on November 1, 2023, a joint notice of the public hearing for the November 15, 2023 Planning Commission and December 19th City Council meeting was published in the Weekly, a newspaper of general circulation in the City;
WHEREAS, on November 15, 2023, the Planning Commission conduct ed a duly noticed public hearing to consider the Addendum to the Genera l Plan EIR and recommend an action on the General Plan text am endments and the Zoning Code update, at the conclusion of which, the Planning Commission voted unanimously (7 -0-0) to recommend that the City Council adopt the Resolution/Zoning Code update addendum Page 3 of 4
Rev: 7/27/2023

Addendum to the General Plan EIR; and
WHEREAS, on December 19, 2023, the City Council conducted a duly noticed pub lic hearing to consider the Addendum to the General Plan EIR, General Plan text amendments, and Zoning Code Update, at which time all interested persons were given an opportunity to give testimony and provide evidence in support of and in opposition to the proposed project; and WHEREAS, in considering the General Plan text amendments and the Zoning Code Update the City Council has reviewed and considered the potential environmental impacts and determined that the environmental effects of the proposed General Plan text amendments were consistent with 2010- 2035 General Plan EIR and Subsequent EIRs , and tha t the proposed General Plan text amendments did not alter the conclusions of the adopted General Plan EIR and Subsequent EIRs.

Resolution/Zoning Code update addendum Page 4 of 4
Rev: 7/27/2023

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. That the City Council hereby finds that the Addendum to the General Plan EIR has been completed in compliance with CEQA.

3. That the City Council hereby finds that the Addendum to the General Plan EIR has been presented to the Council, which reviewed and considered the information and analysis contained therein, and that the Addendum represents the independent judgment of the Council.

4. That the City Council hereby finds that the proposed General Plan Amendments do not involve substantial changes to the General Plan that would require major revisions to the General Plan EIR or Subsequent EIRs.

5. That the City Council hereby finds that there is no substantial change in circumstances as a result of modifications to the General Plan that would require major revisions to the General Plan EIR and Subsequent EIRs or cause new or substantially more severe significant impacts.

6. That the City Council hereby finds that there is no new information of substantial importance that identifies new or more intense significant impacts than those identified in the General Plan EIR and Subsequent EIRs.

7. Based on the findings set forth in this Resolution and the evidence in the City Staff Report, the City Council approves the Addendum to the General Plan EIR, in accordance with CEQA for the Project.
//
//
//
//
Resolution/Zoning Code update addendum Page 5 of 4
Rev: 7/27/2023

8. Effective date. This resolution shall become effective immediately.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A SPECIAL MEETING THEREOF HELD ON THE 19th DAY OF DECEMBER 2023, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

ATTEST: ______________________________

NORA PIMENTEL, MMC

ASSISTANT CITY CLERK

CITY OF SANTA CLARA

Attachments incorporated by reference:

1. Addendum to the General Plan EIR for the Zoning Code Update

City of Santa Clara Zoning Code Update
and
General Plan Amendments

Addendum to the City of Santa Clara
2010-2035 General Plan
Environmental Impact Report

Lead Agency:

City of Santa Clara
Planning Division
1500 Warburton Avenue
Santa Clara, California 95050

Prepared by:

MIG, Inc.
1650 Spruce Street, Suite 106
Riverside, California 92507

Public Review Draft
November 1, 2023

- This document is designed for double-sided printing -

Zoning Code Update and General Plan Amendments i
City of Santa Clara
Table of Contents
1 Introduction ................................ ................................ ................................ .............................. 1

1.1 – Purpose and Authority ................................ ................................ ............................. 1

1.2 – Addendum Analysis and CEQA Guidelines ................................ ............................. 2

1.3 – Tiering ................................ ................................ ................................ ..................... 3

1.4 – Organization and Scope ................................ ................................ .......................... 5

1.5 – Conclusions ................................ ................................ ................................ ............. 5 2 Project Description................................ ................................ ................................ ................... 7

2.1 – Project Title ................................ ................................ ................................ ............. 7

2.2 – Lead Agency Name and Address ................................ ................................ ............ 7

2.3 – Contact Person and Phone Number ................................ ................................ ........ 7

2.4 – Project Location ................................ ................................ ................................ ....... 7

2.5 – Environmental Setting ................................ ................................ ............................. 7

2.6 – General Plan Land Use Designations ................................ ................................ ...... 7

2.7 – Zoning Districts................................ ................................ ................................ ........ 7

2.8 – Project Description ................................ ................................ ................................ .. 8

2.9 – Required Approvals ................................ ................................ ............................... 13

2.10 – Other Public Agency Whose Approval is Required ................................ ................ 13 3 Determination ................................ ................................ ................................ ........................ 19

3.1 – Environmental Categories Potentially Affected ................................ ...................... 19

3.2 – Determination ................................ ................................ ................................ ........ 19 4 Evaluation of Environmental Impacts ................................ ................................ ..................... 21

4.1 – Aesthetics ................................ ................................ ................................ .............. 23

4.3 – Agriculture and Forest Resources ................................ ................................ ......... 28

4.4 – Air Quality ................................ ................................ ................................ .............. 31

4.6 – Biological Resources ................................ ................................ ............................. 36

4.7 – Cultural Resources ................................ ................................ ................................ 43

4.8 – Energy ................................ ................................ ................................ ................... 47

4.9 – Geology and Soils ................................ ................................ ................................ . 50

4.10 – Greenhouse Gas Emissions ................................ ................................ .................. 58

4.12 – Hazards and Hazardous Materials................................ ................................ ......... 61

4.13 – Hydrology and Water Quality ................................ ................................ ................. 67

4.14 – Land Use and Planning ................................ ................................ ......................... 74

4.15 – Mineral Resources ................................ ................................ ................................ 77

4.16 – Noise ................................ ................................ ................................ ..................... 79

4.18 – Population and Housing ................................ ................................ ........................ 83

4.15 – Public Services ................................ ................................ ................................ ...... 86

4.16 – Recreation ................................ ................................ ................................ ............. 91

4.17 – Transportation ................................ ................................ ................................ ....... 94

4.18 – Tribal Cultural Resources ................................ ................................ ...................... 99

4.19 – Utilities and Service Systems ................................ ................................ .............. 103

4.20 – Wildfire ................................ ................................ ................................ ................ 108

4.21 – Mandatory Findings of Significance ................................ ................................ ..... 111 5 Applicable GP / Subsequent SP EIR Mitigation Measures ................................ ................... 114 6 References ................................ ................................ ................................ .......................... 180

6.1 – List of Preparers ................................ ................................ ................................ .. 180

6.2 – Persons and Organizations Consulted ................................ ................................ 180

6.3 – Bibliography ................................ ................................ ................................ ........ 181

Table of Contents
ii Addendum to the General Plan EIR
Public Review Draft November 1, 2023
List of Exhibits

Exhibit 1 Regional Context Map ................................ ................................ ................................ 15 Exhibit 2 Existing General Plan Land Use Map ................................ ................................ ......... 17

Appendices

Appendix A 2010-2035 Santa Clara General Plan EIR
Appendix B Zoning Code Update and General Plan Amendments Appendix C Lawrence Station Area Plan DEIR
Appendix D Tasman East Specific Plan DEIR
Appendix E Patrick Henry Drive Specific Plan DEIR
Appendix F Freedom Circle Focus Area Plan/Greystar General Plan Amendment DEIR

All appendices are incorporated herein by this reference. No other documents are incorporated by reference.

Zoning Code Update and General Plan Amendments 1
City of Santa Clara
1 Introduction
This document has been prepared to serve as an addendum to the previously certified Santa Clara 2010-2035 General Plan Integrated Final Environmental Impact Report (EIR) (SCH # 2008092005), which was certified in January 2011, and subsequent amendments made for the various Specific Plan areas and future focus areas of the city. The City of Santa Clara (“City” or “Lead Agency”) is considering approval of a comprehensive update of the city’s current Zoning Code and corresponding General Plan text amendments (“proposed project” or “project”). The goal of the comprehensive Zoning Code Update (ZCU) is to develop a more up-to-date, readable, and relevant Zoning Code that better aligns with the city’s General Plan and which fully aligns with recent changes in State law . The project would also include a General Plan Amendment (GPA) that would amend the text of the General Plan to reflect the ZCU. The City of Santa Clara is the Lead Agency for the proposed project. This Addendum serves as the environmental review for the Z CU/GPA, prepared pursuant to the provisions of the California Environmental Quality Act (CEQA) Guidelines Section 15164.

1.1 – Purpose and Authority
Pursuant to CEQA, the proposed Zoning Code Update constitutes a “project” that is subject to analysis and determination of enviro nmental effects under CEQA (Public Resources Code Section 21000, et seq.) and the CEQA Guidelines (14 California Code of Regulations Section 15000, et. seq .). This Addendum, its appendices, and related supporting environmental documents have been prepared to determine whether and to what extent the General Plan EIR and associated amendments prepared for the General Plan EIR are sufficient to address the potential impacts of the proposed Zoning Code Update, or whether additional documentation is required under CEQA. The proposed project requires discretionary approval by the City of Santa Clara and, as the project initiator, the City of Santa Clara is the Lead Agency with respect to this Addendum pursuant to §15367 of the CEQA Guidelines.

Specifically, the Pr oject requires the City of Santa Clara ’s approval of a Zoning Code Update and General Plan Amendment. No other governmental agencies have discretionary permitting authority with respect to approval of the proposed project, and no Trustee Agencies, as defin ed in §21070 of the CEQA Statutes, has jurisdiction over resources such that Trustee agency approval is required for entitlement approval.

Under CEQA, the City must determine whether the proposed changes would require a new or supplemental EIR, or whethe r an addendum would suffice. Section 2, Project Description, provides detailed description of the proposed changes. In determining whether an addendum is the appropriate document to analyze the modifications to the project and its approval, State CEQA Guidelines Section 15164 (addendum to an EIR or Negative Declaration) states:

a) The lead agency or a responsible agency shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred. b) An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred. c) An addendum need not be circulated for public review but can be included in or attached to the final EIR or adopted negative declaration.
d) The decision-making body shall consider the addendum with the final EIR or adopted negative declaration prior to making a decision on the project.
e) A brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included in an addendum to an EIR, the lead agency’s required findings on the project, or elsewhere in the record. The explanation must be supported by substantial evidence. 1 – Introduction
2 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

1.2 – Addendum Analysis and CEQA Guidelines
This Addendum has been prepared pursuant to Public Resources Code Section 21166 and CEQA Guidelines Section 15162, 15164, and 15168(c). This Addendum evaluates the project ’s potential environmental effects in light of those effects previously disclosed in the 2010 General Plan EIR and CEQA documents related to subsequent Genera l Plan amendments to determine whether any of the conditions described in Guidelines Section 15162 calling for subsequent CEQA review have occurred.

The General Plan EIR is available for review at the City’s Planning Division, 1500 Warburton Avenue, Santa Clara, California 95050. CEQA Guidelines Section 15164(a) provides that the lead agency “shall prepare an addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.” Sub-Section (c) further provides that an “addendum need not be circulated for public review but can be included in or attached to the final EIR,” and Sub-Section (e) states that a “brief explanation of the decision not to prepare a subsequent EIR pursuant to Section 15162 should be included” in the addendum, the agency’s findings, or elsewhere in the administrative record.

CEQA Guidelines Section 15168(c)(2) provides that “if the agency finds that pursuant to Section 15162, no subsequent EIR will be required, the agency can approve the activity as being within the scope of the project covered by the EIR” and that “[w]hether a later activity is within the scope of a n EIR is a factual question that the lead agency determines based on substantial evidence in the record.” Sub - Section (c)(4) further provides that “[w]here the later activities involve site -specific operations, the agency should use a written checklist or similar device to document the evaluation of the site and the activity to determine whether the environmental effects of the operation were within the scope of the EIR.” According to CEQA Guidelines Section 15162, once an EIR has been certified, no subsequent or supplemental EIR shall be prepared for a project unless the lead agency determines that one or more of the following occurs:

1. Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;

2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or negative declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or

3. New inf ormation of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:

a. The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
b. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
c. Mitigation measures or alternatives prev iously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

1 – Introduction

Zoning Code Update and General Plan Amendments 3
City of Santa Clara
An addendum may be prepared if some changes or additions are necessary to a certified EIR and none of the above-stated conditions apply (CEQA Guidelines Section 15164). Per the above, this Addendum functions as both an “addendum” and a “written checklist,” as called for in CEQA Guidelines Section 15164(a) and 15168(c)(4). As such, this Addendum analyzes the proposed project’s potential environmental effects in light of those effects disclosed in 2010 General Plan EIR consistent with Guidelines Section 15162. Based on a review of the proposed project (as described in Section 2, Project Description) and surrounding circumstances (i.e., the Environmental Setting), this addendum concludes that there is no substantial change proposed that would require major revisions to the prev ious EIR; that there is no substantial change in circumstances as a result of project modifications that would cause new or substantially more severe significant impacts (see Section 3, Environmental Impacts and Mitigation Measures); and, that there is no new information of substantial importance that identifies new or more intense significant impacts (CEQA Guidelines Section 15162).

1.3 – Tiering
Section 15152 et al of the CEQA Guidelines describes “tiering” as a streamlining tool as follows:

(a) "Tiering" refers to using the analysis of general matters contained in a broader EIR (such as one prepared for a general plan or policy statement) with later EIRs and negative declarations on narrower projects; incorporating by reference the general discussions from the broader EIR; and concentrating the later EIR or negative declaration solely on the issues specific to the later project. (b) Agencies are encouraged to tier the environmental analyses which they prepare for separate but related projects including general plans, zoning changes, and development projects. This approach can eliminate repetitive discussions of the same issues and focus the later EIR or negative declaration on the actual issues ripe for decision at each level of environmental review. Tierin g is appropriate when the sequence of analysis is from an EIR prepared for a general plan, policy, or program to an EIR or negative declaration for another plan, policy, or program of lesser scope, or to a site -specific EIR or negative declaration. Tiering does not excuse the lead agency from adequately analyzing reasonably foreseeable significant environmental effects of the project and does not justify deferring such analysis to a later tier EIR or negative declaration. However, the level of detail contained in a first tier EIR need not be greater than that of the program, plan, policy, or ordinance being analyzed.
(c) Where a lead agency is using the tiering process in connection with an EIR for a large -scale planning approval, such as a general plan or component thereof (e.g., an area plan or community plan), the development of detailed, site -specific information may not be feasible but can be deferred, in many instances, until such time as the lead agency prepares a future environmental document in conn ection with a project of a more limited geographical scale, as long as deferral does not prevent adequate identification of significant effects of the planning approval at hand. (d) Where an EIR has been prepared and certified for a program, plan, policy, or ordinance consistent with the requirements of this section, any lead agency for a later project pursuant to or consistent with the program, plan, policy, or ordinance should limit the EIR or negative declaration on the later project to affects which:

(1) Were not examined as significant effects on the environment in the prior EIR; or (2) Are susceptible to substantial reduction or avoidance by the choice of specific revisions in the project, by the imposition of conditions, or other means.

(e) Tiering under this section shall be limited to situations where the project is consistent with the general plan and zoning of the city or county in which the project is located, except that a project requiring a rezone to achieve or maintain conformity with a general plan may be subject to tiering.

1 – Introduction
4 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
(f) A later EIR shall be required when the initial study or other analysis finds that the later project may cause significant effects on the environment that were not adequately addressed in the prior EIR.

A negative declaration shall be required when the provisions of Section 15070 are met.

(1) Where a lead agency determines that a cumulative effect has been adequately addressed in the prior EIR that effect is not treated as significant for purposes of the later EIR or negative declaration and need not be discussed in detail.
(2) When assessing whether there is a new significant cumulative effect, the lead agency shall consider whether the incremental effects of the project would be considerable when viewed in the context of past, present, and probable future projects. At this point, the question is not whether there is a significant cumulative impact, but whether the effects of the project are cumulatively considerable. For a discussion on how to assess wh ether project impacts are cumulatively considerable, see Section 15064(i).
(3) Significant environmental effects have been "adequately addressed" if the lead agency determines that:

(A) they have been mitigated or avoided as a result of the prior envir onmental impact report and findings adopted in connection with that prior environmental report; or (B) they have been examined at a sufficient level of detail in the prior environmental impact report to enable those effects to be mitigated or avoided by site specific revisions, the imposition of conditions, or by other means in connection with the approval of the later project.

(g) When tiering is used, the later EIRs or negative declarations shall refer to the prior EIR and state where a copy of the prior EIR may be examined. The later EIR or negative declaration should state that the lead agency is using the tiering concept and that it is being tiered with the earlier EIR. (h) There are various types of EIRs that may be used in a tiering situation. These include, but are not limited to, the following:

(1) General Plan EIR (Section 15166)
(2) Staged EIR (Section 15167)
(3) Program EIR (Section 15168)
(4) Master EIR (Section 15175)
(5) Multiple-family residential development/residential and commercial or retail mixed -use development (Section 15179.5)
(6) Redevelopment project (Section 15180)
(7) Projects consistent with community plan, general plan, or zoning (Section 15183)

This Addendum for the proposed Zoning Code Update and General Plan Amendment s has been prepared to tier from the General Plan “Program” EIR of the City of Santa Clara dated January 2011, as amended or otherwise supplemented (See Appendix A) . In addition, this addendum has been prepared to tier from the Lawrence Station Area Plan (“Lawrence Station SP”) DEIR dated August 2016 (see Appendix C), the Tasman East Specific Plan (“Tasman East SP”) DEIR dated July 2018 (see Appendix D), the Patrick Henry Drive Specific Plan (“Patrick Henry Drive SP”) DEIR dated July 2021 (see Appendix E), and the Freedom Circle Future Focus Area Plan/Greystar Project General Plan Amendment (“Freedom Circle FFA”) DEIR dated November 2021 (see Appendix F). Mitigation measures from the General Plan EIR and subsequent Specific Plan EIRs are incorporated herein by reference.

1 – Introduction

Zoning Code Update and General Plan Amendments 5
City of Santa Clara

1.4 – Organization and Scope
Although this document is not an initial study, in the interest of providing a thorough examination of any potential environmental impacts, the document has been organized to comply with Section 15063 of the State CEQA Guidelines, which sets forth the required contents of an Initial Study. These include:

 A description of the project, including the location of the project (see Section 2)  Identification of the environmental setting (see Section 2.5)  Identification of environmental effects by use of a checklist, matrix, or other methods, provided that entries on the checklist or other form are briefly explained to indicate that there is some evidence to support the entries (see Section 3)
 Examination of whether the project is compatible with existing zoning, plans, and other applicable land use controls (see Section 4.11)
 Applicable General Plan EIR and Subsequent Specific Plan EIR mitigation measures (see Section 5)
 The name(s) of the person(s) who prepared or participated in the preparation of the Initial Study (see Section 6.1)

1.5 – Conclusions
The City of Santa Clara may approve the proposed project based on this Addendum. The impacts of the proposed project remain within the impacts previously analyzed in the General Plan EI R and associated amendments (CEQA Guidelines Section 15164). The proposed project does not require any revisions to the General Plan EIR. No new significant information or changes in circumstances surrounding the proposed project have occurred since the approval of the General Plan EIR and EIR’s relate to subsequent specific plans and area plans that a mended the General Plan . Therefore, the previous CEQA analyses completed for the General Plan EIR and associated amendments remain adequate. The applicable mitigation measures and/or conditions of approval from the General Plan EIR and associated amendments would be imposed on the proposed project as described herein. The proposed project does not require preparation of a new subsequent or supplemental EIR, due to either the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects. As illustrated herein, the proposed project is consistent with the findings of the General Plan EIR and associated amendments and would involve only minor changes; therefore, an Addendum is appropriate CEQA compliance for the proposed project.

1 – Introduction
6 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

This Page Intentionally Left Blank.

Zoning Code Update and General Plan Amendments 7
City of Santa Clara
2 Project Description

2.1 – Project Title
City of Santa Clara Zoning Code Update

2.2 – Lead Agency Name and Address
City of Santa Clara
Planning Division
1500 Warburton Avenue
Santa Clara, California 95050

2.3 – Contact Person and Phone Number
John Davidson, Principal Planner
(408) 615-2478

2.4 – Project Location
The City of Santa Clara is located in north-central Santa Clara County (See Exhibit 1, Regional Context Map). Santa Clara is at the southern e nd of the San Francisco Bay, approximately 40 miles south of the city of San Francisco. The Planning Area encompasses all incorporated areas located within the boundaries of the City of Santa Clara.

2.5 – Environmental Setting
The City of Santa Clara is essentially built out and the existing land use pattern is predominantly characterized by single family neighborhoods, retail commercial corridors, and industrial/office employment centers (See Exhibit 2, Existing General Plan Land Use Map). These uses are largely separated by major transportation facilities located in the City. U.S. Highway 101 traverses east -west through the center of the City, while State Route 237 is located to the north and Interstates 880 and 280 skirt the southeast and southwest corners of the City, respectively. Existing transit lines include Caltrain, Altamont Commuter Express (ACE), Capitol Corridor, and Valley Transportation Authority (VTA) bus and light rail. The City of Santa Clara covers approximately 18.4 square miles of land, and is completely surrounded by neighboring cities: San José to the north, east and south, and Sunnyvale and Cupertino to the west. The City is located at the center of the Santa Clara Valley, between the Santa Cruz Mountains to the southwest and the Diablo Range to the northeast. Three seasonal creeks run through the City and empty into the southern portion of the San Francisco Bay: the San Tomas Aquino, Saratoga and Calabazas Creeks. Additionally, the City is bordered by the Guadalupe River to the northeast.

2.6 – General Plan Land Use Designations
Multiple.

2.7 – Zoning Districts
Multiple.
2 – Project Description
8 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

2.8 – Project Description
The proposed project includes a comprehensive update to the City of Santa Clara Zoning Code and corresponding text amendments to the General Plan . The following discussion summarizes the key changes and concepts being brought forward through the Zoning Code Update.

Organization of the Zoning Code

The draft updated Zoning Code has been organized and formatted for clarity and ease of use (see Appendix B). One significant change in organizational structure is to move from a nested or cumulative approach to zoning districts to an organization where the contents of each zoning district is self - contained. In the 1969 Zoning Code, uses were listed out within eac h zoning district, and the zoning code was cumulative in nature, meaning that uses in less intense zoning districts were included by reference in the more intense districts of the same type. For example, all of the uses allowed in the CN Neighborhood Commercial district are also allowed in the CC Community Commercial zoning district, and the uses of both zoning districts are allowed in the CT Commercial Thoroughfare zoning district with each district referring back to the other districts for the complete list of allowed uses. Functionally, this means that to understand the uses applicable to a property, a resident might need to follow a chain of references through three chapters of the Code. The updated Zoning Code further improves readability by presenting all similar districts together in a single chapter, with uses presented in tabular format, making it easier to compare regulations between uses and zoning districts. Similarly, development standards, including building heights, setbacks and area limitations such as lot coverage maximums are presented in tables, allowing information to be readily accessed in a concise format. The updated Zoning Code also adds explanatory graphics, helping to clarify code sections such as non - standard setback regulations and sign types.

Zoning Code Changes Required by Recent State Legislation

Over the past year, the State has made a number of changes to the Government Code that are intended to promote housing inventory including several actions cities are required to impleme nt through their Zoning Codes. As a result, the City of Santa Clara has made the following changes to the proposed Zoning Code Update since the release of the February 2022 draft:

 Allowing residential development on land with commercial land use designati ons (SB 6 and AB 2011), provided that the development meets specific conditions including a minimum density of 30 du/ac and paying prevailing wages during construction;  The relaxation of local ADU development standards to allow greater ADU heights near tra nsit (SB 897), and waiving otherwise required front setbacks if a detached ADU of 800 square feet cannot be built (AB 2221);
 Increasing the range of projects that can take advantage of incentives in the Density Bonus Law, including shared housing (AB 682) and commercial projects that include an affordable housing component (AB 1551);
 A prohibition on parking requirements for residential and commercial developments within a half- mile of transit (AB 2097) and for 55-and-older senior housing projects (AB 2334);  Requirements to provide more possible zoning districts for emergency shelters, and to approve emergency shelters using objective standards (AB 2339); and  Prohibition on cities from requiring a public hearing for residential renovation projects that only involve interior reconfigurations (AB 916).

2 – Project Description

Zoning Code Update and General Plan Amendments 9
City of Santa Clara
Some of the new state laws simply changed processing procedures, and individual projects themselves will still be subject to environmental review. For those laws, the Zoning Code changes would be considered administrative actions not likely to result in environmental impacts under CEQA Guidelines 15378(b)(5). These include: SB 6 (residential uses on commercial land); AB 1551 and AB 682 (density bonuses for mixed use and shared housing); and, AB 2339 (emergency shelters in residential zones).

For other laws, the Legislature created a ministerial approval process for certain projects, which has already gone into effect. By adopting an ordinance conforming to state law, the City is not changing anything, because the approvals are already ministerial, and pursuant to CEQA Guidelines Section 15268 (ministerial projects) and Public Resources Code (PRC) Section 21080(b)(1), are not subject to CEQA, whether or not the ordinance is adopted. These include: SB 897 (new max ADU heights); AB 2221 (waiver of front setbacks for ADUs ); AB 2011 (100% affordable projects in commercial zones ); and, AB 916 (reconfiguration of bedrooms ). Finally, two of the laws pertain to parking; however, p arking is not a CEQA impact (Save Our Ac cess v. Watershed Conservation Authority, 68 Cal. App. 5th 8 (2021) ). These include: AB 2097 (no parking near transit ) and AB 2334 (no parking for affordable housing).

New Mixed-Use Zoning Districts

One of the purposes of the proposed Zoning Code Update is to implement existing General Plan land use designations and eliminate any remaining inconsistencies between the City’s General Plan and the Zoning Code. When the City completed the most recent comprehensive update of the General Plan in 2010, staff began a corresponding update to the Zoning Code to more fully align with the new General Plan, but this effort was not completed. This lack of alignment limits the effectiveness of the Zoning Code as an implementation tool for the General P lan. Recent changes in State law also remove an exception for charter cities, such as Santa Clara, that allowed for inconsistency between zoning and General Plan. Other recent changes in State law also require that local land use regulations for residential and mixed-use developments be generally limited to objective standards, which are found in the updated Zoning Code. The Zoning Code Update will address these concerns. For example, the City’s General Plan designates areas for mixed -use development along the City ’s commercial thoroughfares, but the current applicable zoning districts are limited to commercial uses. As a result of the current lack of mixed -use zoning districts, mixed -use projects must be developed using the more cumbersome, expensive and time-consuming Planned Development Zoning process.

The proposed Zoning Code Update adds mixed-use zoning districts that directly align with the City’s General Plan land use designations, including new mixed-use districts for commercial corridors, such as El Camino Real, Homestead Road, and Saratoga Avenue. The creation of mixed -use districts conforming to the General Plan will provide developers with a more streamlined approval process through a development review hearing using objective standards in the a nalysis of projects. The proposed designations for El Camino Real implement the existing General Plan land use designations including the MU -CC Mixed Use – Community Commercial zone, which corresponds to the CMU Community Mixed-Use designation, and the MU -RC Mixed Use – Regional Commercial zone, which corresponds to the RMU Regional Mixed-Use designation. Any future zoning changes that result from the El Camino Real Specific Plan, which is under development, would be adopted separately.

New Industrial Zoning Districts

Most of the employment lands in North Santa Clara are zoned ML Light Industrial, a catch -all designation in the 1969 code, even though the General Plan designates these areas as a mix of Light Industrial, Low Intensity Office or High Intensity Office. Lands designated for Light and Heavy Industrial use are now focused within areas most impacted by the flight path of San José Mineta International Airport (SJC). The Zoning code update also addresses potential height conflicts with airport uses by 2 – Project Description
10 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
limiting heights in industrial districts to the maximum allowed under the FAA’s part 77 surfaces. The update maintains the Light and Heavy Industrial zoning districts in areas with those General Plan designations, especially near SJC, and creates new zoning designation s for Low-Intensity Office/R+D (LO-RD) and High -Intensity Office/R+D (HI -RD) uses, recognizing that additional height and development intensity is now a part of the development program for contemporary office uses. The additional height is related to the low- and high-intensity office designations. The proposed zoning code FARs are the same as in the General Plan, at 1.0 and 2.0 respectively. This change would also better reflect the mix of businesses that are located in Santa Clara’s job centers.

Additional Height Allowances for Industrial Uses with Fewer Employees

The 1969 Zoning Code assumed that light industrial uses would be limited to low -rise development.

Increasingly, developers of modern industrial uses, such as data centers, seek to better utiliz e industrially zoned land. The City has typically granted modifications regarding height through the City’s permit process for these uses. This code change recognizes the contemporary needs for additional height of this development type which are compatible with surrounding forms of industrial development and therefore provides a more logical and streamlined development process. The current maximum height for these uses is 70 feet. Under this change, the maximum allowable height for these uses will be 90 feet.

Streamlined Permitting Processes for Placemaking Uses

The updated Zoning Code includes multiple changes to streamline the permitting of placemaking uses.

The streamlined processes include an increased allowance for restaurants to provide up to 24 outdoor seats without a permit, as opposed to twelve as currently allowed, making it easier for restaurants to activate their adjacent outdoor spaces. The code changes also include a streamlined administrative permit process for temporary outdoor events on private property as well as live entertainment, provided the entertainment use meets residential separation requirements, striking a balance between placemaking and neighborhood protection. These types of activities would be permitted with less time and cost through a streamlined staff review process rather than through City Council action as required by the current Zoning Code.

Simplified Parking Regulations

The parking section of the Zoning Code has been revised to base parking requirements on the floo r area of a building, as opposed to requirements based on other criteria. The parking requirements in the current Zoning Code can prevent an existing commercial space from being re -tenanted for a different commercial use. For example, the current Zoning Co de requirements for restaurants based on the number of seats can effectively prevent a restaurant from entering a vacant commercial space.

Implementing a consistent standard based on square footage makes for an apples -to-apples comparison of required parki ng between different uses such as restaurants and retail and makes it easier to re -tenant buildings. The updated Zoning Code also increases the thresholds for triggering additional parking requirements so that a wider range of tenants can use existing buil dings, reducing the likelihood of vacant commercial space and leading to livelier streets. Additional changes are included to align with recent changes to State law, especially AB 2097, which prohibits cities from requiring parking within one-half mile of a major transit stop.

Construction Parking for Larger Projects

The updated Zoning Code adds requirements for off -street parking for the duration of construction of residential projects of over 100 units in size, or non -residential projects of over 100,000 square feet in 2 – Project Description

Zoning Code Update and General Plan Amendments 11
City of Santa Clara
area. Parking spaces on private property (either the project site or off -site private property) would be required to be available from the time of issuance of building permits until the issuance of a certificate of occupancy. The proposed code provisions include performance standards to maintain the temporary parking lot and to sweep surrounding streets.

Occupancy Limits for Residences

The Zoning Code Update will require that in new or expanded residences, each residential unit maintain a minimum common area (the area dedicated to living rooms, family rooms and kitchens) of 25% of the floor area of the building, to provide adequate common space for congregating in the residences and to prevent dining rooms and living rooms from being converted to bedrooms.

Short-Term Rentals

The proposed Zoning Code Update establishes regulations for short-term rentals, requiring the unit to be owner-occupied or significantly limiting the amount of time that the unit may be rented, and requiring the owner to register with the City, pay the Transient Occupancy Tax (TOT), and meet performance standards. The proposed regulations will establish a maximum number of days (90 aggregate days in a calendar year) that properties can be rented without the owner present, set occupancy limits and require a local contact person.

Increased Allowances for Houses with One-Car Garages

A number of subdivisions were built in Santa Clara in the 1950s with one -car garages and do not conform to the City’s current standard of two parking spaces per single -family residence. Prior to the 2010 General Plan update, the City had a General Plan policy that allowed expansions of these houses by up to 500 square feet before they were required to provide an additional garage space. The Zoning Code Update will codify the ability to make up to a cumulative 1,000-square foot addition to such houses over the life of the building without the need to add a parking space. Any additions made previously will count towards the 1,000-square foot total. Previously, property owners with one-car garages were able to add expansions up to 500 square feet without a variance. This change would increase the size of the addition allowed by 500 square feet and would apply to approximately 5 percent of the existing housing stock within the planning area

By-Right Setback Exceptions

The proposed Zoning Code Update will add by-right exceptions for additions to houses with legal non- conforming side setbacks, provided the addition is to the rear. It has become a frequent practice for the City to grant Variances for such additions in consideration of a lack of any clear negative impact upon the community and the benefit to the homeowner. This change will thus reduce the number of variance cases in the City, especially in relation to pre-war houses in the Old Quad, reducing unnecessary time and cost burdens for homeowners.

Unenclosed Porch Allowances

The Zoning Code Update would increase the amount that unenclosed porches can encroach into the front setback to up to six feet. This change aligns with current community preferences, reflecting the transition from a visual preference for large, uninterrupted front lawns to homes that are more inviting and pedestrian-oriented. Homeowners will be more able to add on an open fr ont porch that could activate their front yard and better convey the homeowner’s identity.

2 – Project Description
12 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

Prohibited Activities

The proposed Zoning Code Update adds language to clarify that residential front and side setbacks need to be free of inoperable vehicles, construction equipment and debris, and other potential attractive nuisances, such as unattended ping-pong tables and inflatable pools. This clarified code language will make it easier for the City to conduct Code Enforcement for non-compliant property owners.

One-and-a-Half Story Accessory Dwelling Units

Recent changes to State law require cities to allow 800 -square foot Accessory Dwelling Units (ADUs) with 4 -foot side and rear yard setbacks. Cities are allowed to have more permissive development standards for Accessory Dwelling Units that go beyond these minimum requirements. In response to community input, particularly from the Old Quad neighborhood, the proposed update will include zoning standards that allow one -and-a-half story ADUs by right. This increased height is considered by the community to be consistent with the historical character of the Old Quad, and an appropriate means of allowing compatible development, as the volume of a half -story is largely underneath the pitch of the roof and use of the half-story reduces the mass of a structure with two habitable floor areas.

Minor Use Permits

The Zoning Code Update will create a Minor Use Permit process to allow more streamlined review of non-controversial uses, such as licenses for beer and wine sales at a restaurant. Neighbors would be notified of the proposed use permit, but a public hearing would only be held if requested by a neighbor.

Non-controversial permits would be approved by the Director of Community Development without a public hearing.

Changes Made as a Result of the Housing Element Update

Several changes are proposed for the Zoning Code Update to implement actions proposed by staff and/or directed by the State Department of Housing and Community Development (HCD) through the City’s Housing Element update process. Specific to the Zoning Code, the State has asked the City to support a wider variety of residential housing choices by allowing a wider variety of housing types in the City’s various residential zoning districts. This includes generally allowing Single Room Occupancies (SROs) and supportive housing (housing that includes supportive services) in multi-family and mixed- use zoning districts. HCD also asked that the City include low -barrier navigation centers as an enumerated use. Low -barrier navigation centers are functionally emergency shelters with additional supportive services.

General Plan Text Amendments

The Zoning Code Update includes an accompanying General Plan Amendment in response to a recent change to State law that requires charter cities to have consistent General Plans and Zoning Codes.

This Amendment would update the mix of industrial areas supported by the General Plan to align with the Zoning Code update and the evolving nature of industrial activity within Santa Clara. First, the General Plan changes would remove limitations on the maximum amount of building area devoted to manufacturing in the Low and High Intensity Office/R+D designations. This would allow both existing industrial businesses to continue in place and would allow for new businesses with a manufacturing component to locate in the new zoning designations that have not yet been applied to the City’s zoning map. Second, the proposed changes would remove the prohibition on Medical Facilities in the areas 2 – Project Description

Zoning Code Update and General Plan Amendments 13
City of Santa Clara
designated High Intensity Office/R+D. Reflecting current practices within the medic al industry, this change would allow medical uses, including uses that both manufacture medical supplies or equipment and perform outpatient procedures, to locate both parts of their business within the same building. Third, the proposed change would modify the definition of Floor Area Ratio (FAR), which is used to regulate building mass. The definition is being changed to clarify that FAR calculation is based on all of the building mass above grade, but excludes basements and below -grade parking. This change to the General Plan text would not change Floor Area Ratio maximums but would more clearly describe a building’s bulk numerically.

Zoning Code Sections to be in Effect Prior to Map Approval

Adoption of the Zoning Code is scheduled for City Council consideration in advance of the proposed adoption of a Zoning Map that would change the zoning at specific locations throughout the City where the current zoning does not align with the General Plan. This change would address the State requirement now applicable to charter cities for the Zoning and General Plan to align. The proposed changes in the Zoning Code Update that are zoning district-based would not become effective until the time of the Zoning Map adoption. However, the bulk of the elements that apply citywide would take effect upon adoption of the Zoning Code.

2.9 – Required Approvals
The project would require the following approvals:

 Zoning Code Update
 General Plan Amendment

2.10 – Other Public Agency Whose Approval is Required
 None.

2 – Project Description
14 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

This Page Intentionally Left Blank.

Zoning Code Update and General Plan Amendments 15
City of Santa Clara
Exhibit 1
Regional Context Map

2 – Project Description
16 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

This Page Intentionally Left Blank.

2 – Project Description
Zoning Code Update and General Plan Amendments 17
City of Santa Clara
Exhibit 2
Existing General Plan Land Use Map

2 – Project Description
18 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

This Page Intentionally Left Blank.

Zoning Code Update and General Plan Amendments 19
City of Santa Clara
3 Determination

3.1 – Environmental Categories Potentially Affected
The environmental categories checked below were identified in the General Plan EIR and subsequent amendments as being a ‘Potentially Significant Impact ,’ and the following sections of this Addendum identify to what degree the proposed project contributes to these previously identified significant impacts.

□ Aesthetics □ Agriculture Resources Air Quality
Biological Resources □ Cultural Resources □ Energy
□ Geology /Soils
Greenhouse Gas
Emissions □
Hazards & Hazardous
Materials
□
Hydrology / Water
Quality □ Land Use / Planning □ Mineral Resources
Noise Population / Housing □ Public Services
□ Recreation Transportation/Traffic □
Tribal Cultural
Resources
Utilities / Service
Systems □ Wildfire □
Mandatory Findings of
Significance

3.2 – Determination
□

The project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
□

Although the project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared. □

The project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.
□

The project MAY have a ‘potentially significant impact’ or ‘potentially significant unless mitigated’ impact on the environment, but at least one effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.

The project could have a significant effect on th e environment , but all of its potentially significant effects (a) have been adequately analyzed in an earlier EIR or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier EIR or NEGATIVE DECLARATION. As such, no further environmental documentation (e.g., a subsequent EIR) is required.

-
-
3 – Determination
20 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

This Page Intentionally Left Blank

Zoning Code Update and General Plan Amendments 21
City of Santa Clara
4 Evaluation of Environmental Impacts

The purpose of this Addendum is to evaluate the CEQA environmental checklist categories in terms of any changed conditions from the approved General Plan EIR and subsequent amendments to the proposed project (e.g., project changes, changed circumstances, o r new information of substantial importance) that may produce a changed environmental result (e.g., a new significant impact or substantial increase in the severity of a previously identified significant effect) pursuant to CEQA Guidelines Section 15162, 15164, and 15168(c). As such, the Addendum’s checklist analysis uses the standard environmental categories provided in Appendix G of the CEQA Guidelines but provides answer columns for evaluation consistent with the considerations listed in Guidelines Section 15162(a).

Mitigation measures identified in the General Plan EIR and applicable to the proposed project are discussed under each environmental Section and are listed in Section 5 – Applicable General Plan EIR Mitigation Measures. As discussed in the following sections, the proposed project would not result in new significant environmental effects or a substantial increase in the severity of impacts previously identified by the General Plan EIR and subsequent amendments.

EXPLANATION OF CHECKLIST EVALUATION CATEGORIES (COLUMNS)

Effect Not Examined in the General Plan EIR?

Pursuant to CEQA Guidelines Section 15168(c)(1), this column indicates whether the project would have effects that were not previously examined by the General Plan EIR and subsequent Specific Plan EIRs, which new effects could necessitate subsequent CEQA review.

Conclusion in the General Plan EIR and Subsequent EIRs?

This column summarizes the conclusion of the General Plan EIR and subsequent Specific Plan EIRs concerning the environmental issue listed under each topic.

Proposed Changes Involving New or More Severe Impacts?

Pursuant to CEQA Guidelines Section 15162(a)(1), this column indicates whether any changes represented by the proposed project would result in new significant environmental impacts not previously identified or mitigated by the General Plan EIR and subsequent Specific Plan EIRs or whether the changes would result in a substantial increase in the severity of a previously identified significant impact.

New Circumstances Involving New or More Severe Impacts?

Pursuant to CEQA Guidelines Section 15162(a)(2), this column indicates whether there have been substantial changes with respect to the circumstances under which the project would be undertaken that would require major revisions to the General Plan EIR and subsequent Specific Plan EIRs due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.

New Information Showing New or More Severe Impacts?

Pursuant to CEQA Guidelines Section 15162(a)(3), this column indicates whether new information of substantial importance, which was not known and could not have been known with the exercise of 4 – Evaluation of Environmental Impacts
22 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
reasonable diligence at the time the General Plan EIR and subsequent Specific Plan EIRs were certified, shows any of the following:

(A) The project would have one or more significant effects not discussed in the General Plan EIR and subsequent amendments;

(B) Significant effects previously examined would be substantially more severe than shown in the General Plan EIR and subsequent amendments;

(C) Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or

(D) Mitigation measures or alternatives that are considerably different from those analyzed in the General Plan EIR and subsequent amendments would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.

If the additional analysis completed as part of this environmental review were to find that the conclusions of the General Plan EIR and subsequent Specific Plan EIRs remain the same and no new significant impacts are identified, or identified impacts are not found to be substantially more severe, or additional mitigation is not necessary, then the question would be answered “ No,” and no subsequent environmental review would be required.

DISCUSSION FOLLOWING CHECKLIST EVALUATION

A discussion of the elements of the checklist is provided under each environmental category in order to clarify the answers regarding the proposed project in relation to the General Plan EIR and subsequent Specific Plan EIRs. The discussion provides information about the particular environmental issue, how the project relates to the issue, and the status of any mitigation that may be required or that has already been implemented. Applicable mitigation measures from the General Plan EIR and subsequent Specific Plan EIRs that apply to the proposed project are listed at the end of each of the topical sections and in Section 5 of this Addendum . The summary of each of the subsequent Specific Plan EIR’s has been excerpted and are included in Appendix C, and each of the summaries includes the mitigation measures for each of the subsequent Specific Plan EIR’s.

Conclusion

Each Section ends with a summary of the conclusion of the preceding analysis.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 23
City of Santa Clara

4.1 – Aesthetics
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR?
Proposed
Changes
Involving
New or
More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Have a substantial adverse
effect on a scenic vista? Yes
Less than
Significant
Impact
No No No
b) Substantially damage
scenic resources, including, but
not limited to, trees, rock
outcroppings, and historic
buildings within view from a
state scenic highway?
Yes
Less than
Significant
Impact
No No No
c) In non-urbanized area,
substantially degrade the
existing visual character or
quality of public views of the
site and its surroundings?
(Public views are those that are
experienced from publicly
accessible vantage point). If
the project is in an urbanized
area, would the project conflict
with applicable zoning and
other regulations governing
scenic quality?
Yes
Less than
Significant
Impact
No No No
d) Create a new source of
substantial light or glare which
would adversely affect day or
nighttime views in the area?
Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Scenic Vistas. The General Plan EIR noted that there are no scenic vistas within the City, but the City of Santa Clara offers many views of the community and surrounding natural features, including panoramic views of the Santa Cruz Mountains and the Diablo Range and stretches of open space and undeveloped land in the Ulistac Natural Area. It was further noted that these scenic vistas can be viewed from the system of roadways and formal and informal public trails throughout the City, but private views of these resources from residential neighborhoods are currently obstructed by adjacent development.

The General Plan EIR found that development and redevelopment under the 2010-2035 General Plan could obstruct views of these scenic vistas from the system of roadways and formal and informal public trails throughout the City. However, it was noted that the 2010-2035 General Plan includes a range of 4 – Evaluation of Environmental Impacts
24 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
policies that provide program -level mitigation for effects to the scenic vistas and ens ure high quality design that maintains the quality of these scenic vistas and ensures their importance in the City’s future.

Therefore, it was determined that implementation of General Plan policies and existing programs would minimize effects to the exist ing scenic vistas and impacts would be less than significant . In addition, subsequent Specific Plan EIRs determined that this impact would not occur or be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to scenic vistas . In addition, the proposed additional height allowances for industrial uses with fewer employees would not apply to areas of the City designated as being part of a scenic vista and where views of scenic vistas are already partially or completely blocked by existing development.

Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(b) Scenic Resources within a State Scenic Highway. The General Plan EIR noted that development under the 2010 -2035 General Plan has the potential to alter the City’s scenic resources. It was also noted that the El Camino Real Focus Area would serve as a gateway into the City and help define the boundary of the City’s historic core, and transition goals and policies, in conjunction with the El Camino Real Focus Are a policies require that this development respect the existing historic character and development patterns of the surrounding area. It was further noted that the Downtown Focus Area offers opportunities for place-making and for a unique destination in the City to serve both local and regional interests, and that revitalization will support the Major Strategies for city identity and community vitality.

The General Plan EIR found that policies related to Areas of Historic Sensitivity and to transitions would also apply in order to respect the existing character and development patterns of the surrounding area.

It was found that most development would go through the City’s architectural review process prior to issuance of building permits, and would be reviewed for consistency with the City’s Design Guidelines.

It was further found that the City’s scenic resources would be managed consistent with city adopted regulations and policies, in combination with State regulations. Therefore, the General Plan EIR determined that implementation of General Plan policies and existing programs would minimize effects to the existing scenic resources and impacts would be less than significant . In addition, subsequent Specific Plan EIRs determined that this impact would not occur or be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approv al of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to scenic resources wit hin a State Scenic Highway . Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 25
City of Santa Clara
(c) Degrade Existing Visual Character. The General Plan EIR noted that new development and redevelopment under the General Plan would be substantial enough, and would occur at key locations throughout the City, such that it could have the potential to degrade the visual character of the City without appropriate planning and oversight. However, t he General Plan EIR noted that most development would go through the City ’s architectural review process prior to issuance of building permits, and would be reviewed for consistency with the City’s Design Guidelines. In addition, it was noted that Focus Areas within which much of the changes would occur are strategically designed to protect the integrity of residential neighborhoods, and changes to public spaces, including roadways, would be designed to upgrade the aesthetic environment. The General Plan EIR found that the City’s visual character would be maintained consistent with city adopted regulations and policies, in combination with State regulations. It was further noted that the General Plan includ es a range of policies to ensure high quality design that supports and enhances the aesthetic qualities and character of the City and minimize or avoid adverse effects on the existing visual character. Therefore, the General Plan EIR determined that implem entation of General Plan policies and existing programs would minimize effects to the existing visual character and impacts would be less than significant. However, the subsequent Specific Plan EIR for the Freedom Circle FFA found that the goals and policies of the Specific Plan presented potential conflicts with applicable General Plan policies governing scenic quality, and the following mitigation measure was incorporated to reduce potential impacts to less than significant:

 Freedom Circle FFA EIR – See Mitigation Measure 4-3.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, includ ing subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any devel opment projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to degradation of the existing visual character of the Planning Area . Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(d) Light and Glare. The General Plan EIR noted that new development and redevelopment under the 2010-2035 General Plan has the potential to create additional light or glare in the City, and sources of light and glare would include external housing lights, street -lights, parking lot light s, security lights, vehicular headlights, internal building lights, and reflective building surfaces and windows. It was also noted that m ost new development would go through the City’s architectural review process prior to issuance of building permits, and would be reviewed for consistency with the City’s Design Guidelines.

The General Plan EIR found that the City’s light and glare would be reduced and managed consistent with city adopted regulations and policies, in combination with State regulations. It was also found that the 2010-2035 General Plan includes a range of policies to provide program-level mitigation for effects to residential neighborhoods from new light and glare resources and ensure high quality design that maintains the quality of existin g neighborhoods and reduces light and glare . Therefore, the General Plan EIR determined that implementation of General Plan policies and existing programs would minimize effects of light and glare and impacts would be less than significant . In addition, subsequent Specific Plan EIRs determined that this impact would not occur or be less than significant.

4 – Evaluation of Environmental Impacts
26 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not resu lt in significant impacts related to light and glare. In addition, the proposed project would not make any changes to the City’s Zoning Code related to light and glare. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR noted that visual and scenic resources are generally localized, although specific resources can be regional in nature, such as vistas of a mountain range. It was also noted that build - out of the General Plan would be limited to redevel opment of existing urbanized areas within Santa Clara, as there are only a small number of vacant undeveloped parcels remaining in the City. Further, it was noted that cumulative development within Santa Clara by other public agencies (i.e., public school districts), or in adjacent communities (i.e., San Jose), would also largely consist of ‘recycling’ of existing developed parcels for new urban land uses or intensification of existing land uses. The General Plan EIR determined that i mplementation of the Ge neral Plan, including implementation of design review process and incorporation of applicable policies regulating the appearance of new development, would not result in impacts to regional visual and scenic resources, such as the Valley’s surrounding hillsides, in that new development and redevelopment would not be of a scale or density to affect regional visual and scenic resources. Therefore, the General Plan EIR determined that the City ’s contribution to cumulative regional visual and scenic resource impacts would be less than significant. In addition, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that cumulative projects would not result in a cumulative visual or aesthetic impact and cumulative aesthetics impacts would be less than significant.

The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA. The proposed project would be required to implement subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed project would not result in a greater aesthetics impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative aesthetics impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to aesthetics impacts. However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. Sub sequent Specific Plan EIR mitigation measures, as referenced above and 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 27
City of Santa Clara
listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan. With incorporation subsequent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect on scenic vistas, scenic vistas, visual character, or light and glare. No new significant impacts and no substantial increase in the severity of previously identified impacts assoc iated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

Freedom Circle FFA EIR – See Mitigation Measure 4-3.

4 – Evaluation of Environmental Impacts
28 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

4.3 – Agriculture and Forest Resources
In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland. In determining whether impacts to forest resources, including timberland, are significant environmental effects, lead agencies may refer to information compiled by the California Department of Forestry and Fire Protection regarding the state’s inventory of forest land, including the Forest and Range Assessment Project and the Forest Legacy Assessment Project; and forest carbon measurement methodology provided in Forest Protocols adopted by the California Air Resources Board.

Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or
More Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Convert Prime
Farmland, Unique
Farmland, or Farmland of
Statewide Importance
(Farmland), as shown on
the maps prepared pursuant
to the Farmland Mapping
and Monitoring Program of
the California Resources
Agency, to non-agricultural
use?
No Not Examined No No No
b) Conflict with existing
zoning for agricultural use,
or a Williamson Act
contract?
No Not Examined No No No
c) Conflict with existing
zoning for, or cause
rezoning of, forest land (as
defined in Public Resources
Code Section 12220(g)),
timberland (as defined by
Public Resources Code
Section 4526), or timberland
zoned Timberland
Production (as defined by
Government Code Section
51104 (g))?
No Not Examined No No No
d) Result in loss of forest No Not Examined No No No
4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 29
City of Santa Clara
land or conversion of forest
land to non-forest use?
e) Involve other changes in
the existing environment
which, due to their location
or nature, could result in
conversion of Farmland to
non-agricultural use or
conversion of forest land to
non-forest use?
No Not Examined No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Designated Farmland. The General Plan EIR and subsequent Specific Plan EIRs did not analyze impacts related to conversion of Prime Farmland, Unique Farmland, or Farmland of Statewide Importance because these impacts were screened out during the Initial Study process.

The City of Santa Clara is almost completely urbanized and there are very few undeveloped parcels in the Planning Area. While there are locations in the City designated (A) Agricultural, there are no lands designated by the Farmland Mapping and Monitoring Prog ram as being Prime Farmland, Unique Farmland, or Farmland of Statewide Importance . Therefore, the proposed Zoning Code Update and General Plan Amendments would not convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to non-agricultural use.

(b) Williamson Act. The General Plan EIR and subsequent Specific Plan EIRs did not analyze impacts related to Williamson Act contracts because these impacts were screened out during the Initial Study process.

The City of Santa Clara is almost completely urbanized and there are very few undeveloped parcels in the Planning Area. There are no lands within the City under a Williamson Act contract. Therefore, the proposed project would not conflict with existing zoning for agricultural use, or a Williamson Act contract.

(c) Forest Zoning. The General Plan EIR and subsequent Specific Plan EIRs did not analyze conflicts with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timb erland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104 (g)) because these impacts were screened out during the Initial Study process.

There are no areas of the City zoned as forest land or timberland resources. Therefore, the proposed project would not conflict with existing zoning for forest land or timberland.

(d) Loss or Conversion of Forestland. The General Plan EIR and subsequent Specific Plan EIRs did not analyze impacts related to the loss of forest land or conversion of forest land to non -forest use because these impacts were screened out during the Initial Study process.

There are no areas of the City zoned as forest land, and the Planning Area does not contain any forest land resources. Therefore, the proposed project would not result in the loss or conversion of forest land.

4 – Evaluation of Environmental Impacts
30 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
(e) Other Changes. The General Plan EIR and subsequent Specific Plan EIRs did not analyze impacts related to the conversion of Farmland to non-agricultural use or conversion of forest land to non-forest use because these impacts were screened out during the Initial Study process.

The Zoning Code Update and General Plan Amendments do not re-zone or re -designate any parcel within the City from agricultural uses or zones to other uses. Development associated with implementation of the Zoning Code Update and General Plan Amendments would not result in the conversion of any agricultural or forest land to non-agricultural or non-forest uses. In addition, the Zoning Code Update and General Plan Amendments do not propose any specific development that would result in the conversion of farmland to non -agricultural use. There are no parts of the City designated as timberland, forest land, o r farmland. As such, implementation of the project would not result in a conversion of these land uses to another use. Therefore, the impact would be less than significant.

Cumulative Impacts

The General Plan EIR and subsequent Specific Plan EIRs did not analyze cumulative impacts related to the loss of agricultural or forest land. The City of Santa Clara is almost completely urbanized and is designated in Farmland Mapping and Monitoring Program as “Urban and Built -Up Land” .

Implementation of the proposed Zoning Code Update and General Plan Amendments would not result in the loss or conversion of agricultural or forest uses. Therefore, no cumulative agriculture and forest resources impacts would occur as a result of the proposed project.

Conclusion

No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed Zoning Code Update and General Plan Amendments would occur.

Likewise, there is no new information of substantia l importance requiring new analysis or verification.

The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

There are no applicable General Plan EIR or subsequent Specific Plan EIR mitigation measures.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 31
City of Santa Clara

4.4 – Air Quality
Where available, the significance criteria established by the applicable air quality management district or air pollution control district may be relied upon to make the following determinations.

Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Conflict with or obstruct
implementation of the
applicable air quality plan? Yes
Significant
and
Unavoidable
Impact
No No No
b) Result in a
cumulatively considerable
net increase of any criteria
pollutant for which the
project region is non-
attainment under an
applicable federal or state
ambient air quality
standard?
Yes
Significant
and
Unavoidable
Impact
No No No
c) Expose sensitive
receptors to substantial
pollutant concentrations? Yes
Significant
and
Unavoidable
Impact
No No No
d) Result in other
emissions (such as those
leading to odors) adversely
affecting a substantial
number of people?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Conflict with AQMP. The General Plan EIR noted that population projections under the General Plan are slightly above the Bay Area 2005 Ozone Strategy and the Bay Area 2010 Clean Air Plan .

However, it was also noted that the rate of VMT growth is less than half the rate of population growth.

Therefore, the General Plan EIR determined that the 2010-2035 General Plan would be consistent with the 2010 CAP and impacts would be less than significant.

The General Plan EIR also noted that the Air District has a long history of implementing control measures to reduce ozone precursor emissions from stationary, area, mobile and transportation sources, and transportation control measures (TCMs) were de signed to reduce emissions from motor vehicles by reducing vehicle trips and vehicle miles traveled. The General Plan EIR also noted that 4 – Evaluation of Environmental Impacts
32 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
TCMs may also reduce vehicle use, vehicle idling or traffic congestion , and that t he TCMs address State ozone planning requirements for the Bay Area. The General Plan EIR found that the policies under the 2010-2035 General Plan support and reasonably implement the applicable Bay Area 2005 Ozone Strategy and the Bay Area 2010 Clean Air Plan TCMs. Therefore, the General Pla n EIR determined that the 2010-2035 General Plan would be consistent with the TCMs and project impacts would be less than significant. However, the subsequent Specific Plan EIR for the Lawrence Station SP found that implementation of the Specific Plan would result in a significant an unavoidable impact and there are no feasible mitigation measures that reduce the impact to less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, project impacts would be similar to and no greater than those evaluated in the General Plan EIR and subsequent EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the General Plan and Zoning Code would be required to perform environmental review to ensure they do not conflict with the AQMP. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would also contribute to a conflict with the applicable AQMP and result in a significant and unavoidable impact.

(b) Cumulatively Considerable Net Increase in Criteria Pollutant Emissions. The General Plan EIR noted that new development and redevelopment allowed under the 2010 - 2035 General Plan could increase the concentration of air pollutants. However, the General Plan EIR found that implementation of General Plan policies and existing regulations and programs would substantially reduce air pollutants.

Therefore, the General Plan EIR determined that implementation of the General Plan would not result in a cumulatively considerable net increase in any criteria pollutant emission and impacts would be less than significant. However, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA found that construction related impacts would require implementation of the below mitigation measures to reduce impacts to less than significant. In addition, the subsequent Specific Plan EIR s determined that operational impacts would be significant and unavoidable even with incorporation of mitigation.

 Lawrence Station SP EIR – See Mitigation Measures AQ-4, AQ-5, AQ-6, and AQ-7.  Tasman East SP EIR – See Mitigation Measures AQ-1.1, AQ-1.2, AQ-2.1, AQ-2.2, and AQ-2.3.  Patrick Henry Drive SP EIR – See Mitigation Measures 5-2A, 5-2B, 5-2C, and 5-2D.  Freedom Circle FFA EIR – See Mitigation Measures 5-3A, 5-3B, 5-3C, and 5-3D.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, project impacts would be similar to and no greater than those evaluated in the General Plan EIR and subsequent EIRs . The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in cumulatively considerable net increases in criteria pollutant emissions for which the Air Basin is in non-attainment. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, even with incorporation of the mitigation measures listed above, implementation of the proposed project would also contribute to a cumulatively considerable net increase in criteria pollutant emissions and result in a significant and unavoidable impact.
4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 33
City of Santa Clara
(c) Exposure of Sensitive Receptors Substantial Pollutant Concentrations. The General Plan EIR found that new development and redevelopment allowed under the 2010 - 2035 General Plan could result in construction dust emissions that could affect local and regional air quality . However, the General Plan EIR found that implementation of General Plan policies and existing regulations and programs would substantially reduce construction dust emissions and impacts would be less than significant. The General Plan EIR also found that implementation of the 2010-2035 General Plan may involve the placement of sensitive receptors (e.g., new residences) near localized sources of Toxic Air Contaminants (TACs). The General Plan EIR subsequently found that the 2010-2035 General Plan does not provide adequate buffers between existing sources of TAC and new residences or sensitive receptors. As such, the General Plan EIR determined that the impact would be significant and unavoidable, even with the incorporation of Mitigation Measure 4.10 -1 However, the subsequent Specific Plan EIR for the Lawrence Station SP found implementation of the following mitigation measures would reduce impacts to less than significant:

 Lawrence Station SP EIR – See Mitigation Measures AQ-1, AQ-2, and AQ-3

However, subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle FFA found that impacts would be significant and unavoidable even with incorporation of the following mitigation measures:

 Patrick Henry Drive SP EIR – See Mitigation Measures 5-3A and 5-2B.  Freedom Circle FFA EIR – See Mitigation Measures 5-3A, 5-3B, 5-3C, and 5-3D.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, project impacts would be similar to and no greater than those evaluated in the General Plan EIR and subsequent EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in exposure of sensitive receptor s to substantial pollutant concentrations. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subs equent Specific Plan EIRs , even with incorporation of the mitigation measures listed above, implementation of the proposed project would also contribute to the exposure of sensitive receptors to substantial pollutant concentrations and result in a significant and unavoidable impact.

(d) Other Emissions Such as Odors. The General Plan EIR noted that i mplementation of the 2010- 2035 General Plan may involve the placement of sensitive receptors (e.g. , new residences) near localized sources of odors. The General Plan EIR subsequently found that the 2010-2035 General Plan does not provide adequate buffers between sources of odors and new residences or sensitive receptors. As listed in the Mitigation Measures section below, the General Plan EIR found that the addition of Policy 5.1.1 -P25 to the Prerequisite section and Policy 5.10.5 -P34 to the Safety section would require minimum screening or buffer distances between emissions sources and sensitive receptors. As such, the General Plan EIR included incorpora tion of Mitigation Measure 4.10 -2.

Therefore, the General Plan EIR determined that impacts from implementation of the General Plan would be less than significant with incorporation of mitigation measures. Subsequent Specific Plan EIRs also determined that this impact would be less than significant without the need for additional mitigation measures.

4 – Evaluation of Environmental Impacts
34 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, project impacts would be similar to the General Plan EIR. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would have a less than significant effect.

Cumulative Impacts

The General Plan EIR noted that air pollution is a regional issue affected by climate, land uses, and topography. The General Plan EIR also noted that Section 4.10, Air Quality includes a detailed analysis of the cumulative air quality conditions related to build -out of the 2010-2035 General Plan, as well as the General Plan’s conformance with the existing Bay Area 2005 Ozone Strategy and the draft 2010 Bay Area Clear Air Plan, which have been based on regional ABAG projections. The General Plan EIR found that the 2010 -2035 General Plan would conform with the current and proposed long -range air quality plans for the Bay Area. Therefore, the General Plan EIR determined that implementation of the General Plan would result in a less than cumulatively considerable contribution to cumulative air quality impacts. However, the subsequent Specific Plan EIRs for the Lawrence Station SP , the Tasman East SP, the Patrick Henr y Drive SP, and the Freedom Circle FFA determined that while cumulative construction, air quality impacts would be reduced to less than significant with incorporation of mitigation measures, long-term cumulative operational emissions would be significant and unavoidable even with incorporation of mitigation measures.

The Planning Area is completely urbanized and cumulative impacts related to air quality were analyzed in the General Plan EIR and were determined to be less than significant. While the proposed Zoning Code Update and General Plan Amendments would conflict with implementation of the applicable air quality plan, similar to what was determined in the General Plan EIR and subsequent Specific Plan EIRs, the proposed project would not result in a cumulatively considerable net increase of any criteria pollutant. The proposed Zoning Code Update and General Plan Amendments would be required to implement General Plan EIR Mitigation Measures 4.10 -1 and 4.10 -2 as well as subsequent Specific Plan EIR mitigation measures incorporated by reference . The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental revie w pursuant to CEQA. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, implementation of the proposed project would also contribute to cumulative air quality impacts, even with incorporation of mitigation, and would result in a significant and unavoidable cumulative impact.

Conclusion

Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to the mobile, energy, and area sources that cumulatively contribute to criteria pollutant levels and associated air pollution in the Basin. Future development would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. General Plan EIR Mitigation Measures 4.10 -1 and 4.10 -2, incorporated by reference , would also be app licable to development under the General Plan and Zoning Code. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur, nor would the significant unavoidable impacts identified in the General Plan EIR and subsequent Specific Plan EIRs be worsened. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 35
City of Santa Clara
propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

General Plan EIR: 4.10-1 and 4.10-2.

Lawrence Station SP EIR: AQ-1, AQ-2, AQ-3, AQ-4, AQ-5, AQ-6, and AQ-7.

Tasman East SP EIR: AQ-1.1, AQ-1.2, AQ-2.1, AQ-2.2, and AQ-2.3.

Patrick Henry Dr. SP EIR: 5-2A, 5-2B, 5-2C, 5-2D, and 5-3A.

Freedom Circle FFA EIR: 5-3A, 5-3B, 5-3C, 5-3D, 5-4A, 5-4B, and 5-5.

4 – Evaluation of Environmental Impacts
36 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

4.6 – Biological Resources

Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Have a substantial
adverse effect, either
directly or through habitat
modifications, on any
species identified as a
candidate, sensitive, or
special status species in
local or regional plans,
policies, or regulations, or
by the California
Department of Fish and
Game or U.S. Fish and
Wildlife Service?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
b) Have a substantial
adverse effect on any
riparian habitat or other
sensitive natural community
identified in local or regional
plans, policies, regulations,
or by the California
Department of Fish and
Game or US Fish and
Wildlife Service?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
c) Have a substantial
adverse effect on state or
federally protected wetlands
(including, but not limited to,
marsh, vernal pool, coastal,
etc.) through direct removal,
filling, hydrological
interruption, or other
means?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
d) Interfere substantially
with the movement of any
native resident or migratory
fish or wildlife species or
with established native
resident or migratory wildlife
corridors, or impede the use
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 37
City of Santa Clara
of native wildlife nursery
sites?
e) Conflict with any local
policies or ordinances
protecting biological
resources, such as a tree
preservation policy or
ordinance?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
f) Conflict with the
provisions of an adopted
Habitat Conservation Plan,
Natural Community
Conservation Plan, or other
approved local, regional, or
state habitat conservation
plan?
Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Listed or Sensitive Species. The General Plan EIR found that new development under the 2010- 2035 General Plan would result in minimal direct impacts due to habitat loss since there are very few vacant, undeveloped parcels left in the City proposed for urban development that provide habitat value.

The General Plan EIR noted that the vast majority of new development anticipated under the 2010 - 2035 General Plan would occur on parcels already developed with an urban use. However, the General Plan EIR found that future development of vacant parcels containing ruderal grasslands has the potential to impact the Congdon’s tarplant, should the tarplant be present at the time of development.

Further, the General Plan EIR found that development of vacant parcels could result in impacts to individual burrowing owls if owls moved onto the site prior to project construction. In addition, it was noted that if owls are using active nests when construction activity commences, grading of the site could result in destruction of nests and individual owls. The General Plan EIR found that development under the 2010-2035 General Plan would be required to comply with State and federal regulations regarding special-status species. In addition, it was found that General Plan policies would reduce the potential for impacts on the special -status species considered most likely to use habitat in the City. As such, mitigation measures 4.9-1 and 4.9-2 were incorporated into the General Plan EIR to ensure avoidance of Congdon’s tarplant and burrowing owl. Therefore, the General Plan EIR determined that impacts to species identified as a candidate, sensitive, or special status species would be less than significant with incorporation of mitigation measures. In addition, subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that impacts to special status species would be less than significant with incorporation of the following subsequent EIR mitigation measures:

 Lawrence Station SP EIR – See Mitigation Measures BIO-1a, BIO-1b, BIO-1c, and BIO-2.  Tasman East SP EIR – See Mitigation Measures BIO-1.1, BIO-2.1, BIO-2.2, BIO-2.3, BIO-2.4, BIO-3.1, BIO-5.1, BIO-5.3, and BIO-5.4.
 Patrick Henry Drive SP EIR – See Mitigation Measures 6-3 and 6-4.  Freedom Circle FFA EIR – See Mitigation Measures 6-3 and 6-4.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to 4 – Evaluation of Environmental Impacts
38 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to special- status species or their habitat. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subseq uent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(b) Riparian Habitat or Sensitive Natural Communities . The General Plan EIR found tha t redevelopment of urban parcels adjacent to riparian corridors along Calabazas Creek, San Tomas Aquino Creek, and Guadalupe River has the potential to indirectly affect the habitat value of the riparian corridor. It was further noted that the De La Cruz and Tasman East Focus Areas are each immediately west of the Guadalupe River riparian corridor, separated by an earthen levee, and future redevelopment of each Focus Area, in particular, could affect wildlife movement along the Guadalupe River.

Additionally, it was noted that the east bank of the Guadalupe River adjacent to Santa Clara is under the jurisdiction of the City of San Jose and is included within the Valley HCP boundary . The Valley HCP’s conservation strategy to ensure urban development on the eas t side of the Guadalupe River doesn’t further degrade the riparian corridor’s habitat value is to apply the City of San Jose’s Riparian Corridor Policy. In addition, the General Plan EIR found that the 2010 -2035 General Plan includes updated biological policies that address impacts to riparian habitats. As described in the General Plan EIR, the City of Santa Clara has adopted the Water Collaborative’s Guidelines and Standards for Land Uses Near Streams, and the two riparian protection policies (5.10.1-P2 and 5.10.1-P5) are functionally equivalent and will ensure that new development and redevelopment on either bank of the Guadalupe River doesn’t significantly impact wildlife movement along the Guadalupe River. Finally, it was found that there are no other sensitive natural communities present in the City. Therefore, the General Plan EIR determined that impacts to riparian habitat or other sensitive natural communit ies would be less than significant. However, subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that the following mitigation measures are required to reduce potential impacts to sensitive habitat to less than significant:

 Tasman East SP EIR – See Mitigation Measure BIO-4.1.
 Patrick Henry Drive SP EIR – See Mitigation Measure 6-2.  Freedom Circle FFA EIR – See Mitigation Measure 6-2.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to riparian habitat or sensitive natural communities. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(c) Protected Wetlands. The General Plan EIR noted that wetlands and other waters are protected under the federal Clean Water Act and the State’s Porter -Cologne Water Quality Control Act, and are 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 39
City of Santa Clara
under the jurisdiction of the U.S. Army Corps of Engineers and the San Francisco Bay Regional Water Quality Control Board. It was further noted that Federal and State regulations require avoidance of impacts to the extent feasible, and compensation for unavoidable losses of jurisdictional wetlands and waters. The General Plan EIR found that development along the City’s watercourses would have some potential to affect jurisdictional waters and wetlands. Despite this, the General Plan EIR determined that compliance with existing regulations and proposed General Plan policies would ensure impacts on state or federally protected wetlands would be less than significant. However, subsequent Specific Plan EIR for the Tasman East SP determined that the following mitigation measures are required to reduce potential impacts to wetlands to less than significant:

 Tasman East SP EIR – See Mitigation Measures BIO-6.1, BIO-6.2, BIO-7.1, BIO-8.1, BIO-8.2, BIO-9.1, BIO-9.2, and BIO-9.3.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to protected wetlands or waters. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(d) Wildlife Movement. The General Plan EIR noted that the creeks that flow through the City provide the primary wildlife movement corridors, and therefore future development near the creeks has the potential to disrupt or disturb wildlife movements along the creek corridors. However, the General Plan EIR found that the City’s implementation of the Water Collaborative’s Guidelines and Standards for Land Uses Near Streams would minimize the potential for impacts to wildlife movement. Therefore, the General Plan EIR determined impacts to the movement of any native resident or migratory fish or wildlife species would be less than significant. However, the subsequent Specific Plan EIR for the Tasman East SP determined that the following mitigation measures are required to reduce potential impacts to wildlife movement to less than significant:

 Tasman East SP EIR – See Mitigation Measure BIO-3.1.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to wildlife corridors or wildlife movement. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

4 – Evaluation of Environmental Impacts
40 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
(e) Local Policies. The General Plan EIR noted that there is a city ordinance currently in effect to protect trees on public property, and the General Plan proposes a new policy that would afford protection to specified trees on private property . Therefore, the General Plan EIR determined that Development under the 2010-2035 General Plan would not conflict with the existing tree ordinance and impacts would be less than significant. However, subsequent Specific Plan EIRs for the Lawrence Station SP and the Tasman East SP determined that the following mitigation measures are required to reduce potential impacts from tree removal to less than significant:

 Lawrence Station SP EIR – See Mitigation Measures BIO-3a and BIO-3b.  Tasman East SP EIR – See Mitigation Measures BIO-10.1 and BIO-10.2.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to conflicts with located policies protecting biological resources. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(f) Habitat Conservation Plans. The General Plan EIR found that the City is not located within the study area, but rather adjacent to, the Valley Habitat Conservation Plan (HCP). It was also found that future nitrogen emissions attributable to the General Plan’s net new development in 2035 would constitute approximately 1.5 percent of total emissions and would represent a less than cumulatively considerable contribution to nitrogen deposition impacts to the serpentine grassland special status flora and fauna being addressed in the Valley HCP . Therefore, the General Plan EIR and subsequent Specific Plan EIRs determined that conflict s with the provisions of an adopted Habitat Cons ervation Plan would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in conflicts with habitat conservation plans. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR noted that there is minimal vacant, undeveloped land within Santa Clara that provides suitable habitat for rare, threatened, or endangered flora or fauna, and that most suitable 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 41
City of Santa Clara
habitat in the City is concentra ted along the several creek corridors. It was also noted that the predominant biologic impacts associated with implementation of the 2035 General Plan would occur to common, urban-adapted species. In the rare instances where future development would involve a site with a special status species, appropriate mitigation, including avoidance, would be implemented to reduce the impacts to a less than significant level. Therefore, the General Plan EIR determined that new construction and redevelopment within the City of Santa Clara would not contribute to cumulative impacts to special status plants and animals present within the City. As further discussed in Section 4.9 Biology of the General Plan EIR, regional nitrogen deposition impacts to serpentine habitat in southern San Jose is a cumulative issue being addressed by the Local Partner agencies participating in the Valley HCP. However, for the reasons provided in Section 4.9, Santa Clara’s NOx contribution from new development allowed under the 2035 General Plan was determined to be less than cumulatively considerable. Finally, it was also determined that Nitrogen Oxides (NOx) emissions associated with the City’s electrical utility, Silicon Valley Power, would be mitigated on an ongoing basis through management of serpentine habitat on Coyote Ridge in San Jose . Therefore, the General Plan EIR determined that cumulative biological impacts would be less than significant. In addition, the subsequent Specific Plan EIR for the Lawrence Station SP determined that cumulative biological impacts would be less than significant with incorporation of mitigation measures. However, the subsequent Specific Plan EIR for the Tasman East SP determined that cumulative biological impacts would be significant and unavoidable.

The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA. The proposed project would be required to implement General Plan EIR Mitigation Measures 4.9 -1 and 4.9 -2 as well as subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed project would not result in a greater impact on biological resources than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative biological resources impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to bio logical resources impacts.

However, future d evelopment projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if re quired. General Plan EIR and subsequent Specific Plan EIR mitigation measures, as listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan . With incorporation of General Plan EIR and subs equent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect on any sensitive species or habitat, on any wetlands, with the movement of any native resident or migratory fish or wildlife species, and would n ot conflict with local policies or ordinances protecting biological resources or with a habitat conservation plan. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur, nor would the significant unavoidable impacts identified in the General Plan EIR and subsequent Specific Plan EIRs be worsened . Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not 4 – Evaluation of Environmental Impacts
42 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

General Plan EIR: 4.9-1 and 4.9-2.

Lawrence Station SP EIR: BIO-1a, BIO-1b, BIO-1c, BIO-2, BIO-3a, and BIO-3b.

Tasman East SP EIR: BIO-1.1, BIO-2.1, BIO-2.2, BIO-2.3, BIO-2.4, BIO-3.1, BIO-4.1, BIO-5.1, BIO-5.2, BIO-5.3, BIO-5.4, BIO-6.1, BIO-6.2, BIO-7.1, BIO-8.1, BIO-8.2, BIO-9.1, BIO-9.2, BIO-9.3, BIO-10.1, and BIO-10.2.

Patrick Henry Dr. SP EIR: 6-2, 6-3, and 6-4.

Freedom Circle FFA EIR: 6-2, 6-3, and 6-4.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 43
City of Santa Clara

4.7 – Cultural Resources
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Cause a substantial
adverse change in the
significance of a historical
resource pursuant to
Section15064.5?
Yes
Significant
and
Unavoidable
Impact
No No No
b) Cause a substantial
adverse change in the
significance of an
archaeological resource
pursuant to
Section15064.5?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
c) Disturb any human
remains, including those
interred outside of
dedicated cemeteries?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Historical Resources. The General Plan EIR noted that future development under the 2010-2035 General Plan has the potential to impact, either directly or indirectly, historic resources, both those that are currently listed, and those that have yet to be identified and evaluated . It was also noted that t he General Plan’s Phase III Prerequisite policy to conduct a citywide survey prior to Phase III (2025) would encompass buildings constructed prior to 1975 (i.e., buildings constructed prior to 1975 would be at least 50 years of ag e in 2025), and would identify whether additional buildings have achieved historic significance over time. Further, it was noted that buildings over 50 years of age would be evaluated prior to demolition or substantial alteration on a case -by-case basis. The General Plan EIR found that implementation of General Plan policies and programs, including application of the California Historic Building Code and the City’s Combining Historic Districts, the City’s design review process, and referral of projects invo lving historic resources to the Historical and Landmarks Commission, would serve to minimize historic resources impacts. Therefore, the General Plan EIR determined that implementation of proposed policies and existing programs would reduce potential historical resources impacts to less than significant. In addition, the subsequent Specific Plan EIR for the Lawrence Station SP determined that incorporation of the following subsequent EIR mitigation measure would be required to reduce this impact less than significant:

 Lawrence Station SP EIR – See Mitigation Measure CUL-1.

4 – Evaluation of Environmental Impacts
44 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
However, the subsequent Specific Plan EIRs for th e Patrick Henry Drive SP and the Freedom Circle FFA determined that even with implementation of the following mitigation measures this impact would be significant and unavoidable:

 Patrick Henry Drive SP EIR – See Mitigation Measure 7-1.  Freedom Circle FFA EIR – See Mitigation Measure 7-1.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to historical resources. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Nevertheless, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in a significant and unavoidable impact.

(b) Archaeological Resources. The General Plan EIR found that future development and redevelopment and construction activities under the 2010 -2035 General Plan may result in direct or indirect impacts to both prehistoric and historic archaeological resources. It was also not ed that construction activities such as grading and excavation may result in the accidental destruction or disturbance of archaeological sites. Further, it was found that all areas of the City hold potential for the presence of prehistoric archaeological r esources, with the exception of current and former stream channels and areas with artificial fill. However, the General Plan EIR found that 2010 -2035 General Plan includes a range of policies to ensure the protection of archaeological resources. The Genera l Plan EIR found that existing federal, State, and local regulations address the provision of studies to identify archaeological and paleontological resources; application review for projects that would potentially involve land disturbance; provide a proje ct-level standard condition of approval that addresses unanticipated archaeological and or paleontological discoveries; and requirements to develop specific mitigation measures if resources are encountered during any development activity .

Therefore, the General Plan EIR determined implementation of General Plan policies and existing programs would reduce the impact to archaeological resources to less than significant . However, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant with incorporation of the following subsequent EIR mitigation measures:

 Lawrence Station SP EIR – See Mitigation Measure CUL-2 and CUL-3.  Tasman East SP EIR – See Mitigation Measures CUL-1.1, CUL-1.2, and CUL-1.3  Patrick Henry Drive SP EIR – See Mitigation Measure 7-2.  Freedom Circle FFA EIR – See Mitigation Measures 7-3 and 7-4.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, an d all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 45
City of Santa Clara
archaeological resources. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(c) Human Remains. The General Plan EIR noted that implementation of the 2010-2035 General Plan would allow development and redevelopment, including grading, of sensitive areas, possibly disturbing human remains, including those outside of formal cemeteries. However, it was found that e xisting regulations, including the California Public Resources Code. Section 5097.98, would afford protection for human remains dis covered during development activities. In addition, review and protection are afforded by CEQA for those projects subject to discretionary action, particularly for activities that could potentially disturb human remains. Further, it was noted that SB 18 re quires consultation regarding Native American sites and artifacts, but the potential for project -level impacts to unidentified and unrecorded tribal cultural places remains moderate to high. As such, it was found that future excavation and grading activities could result in impacts to human remains. However, it was determined that Public Resources Code Section 5097.98 mandates the process to be followed in the event of a discovery of any human remains, and would mitigate all potential impacts . Therefore, th e General Plan EIR determined that implementation existing programs would reduce the impact to human remains to less than significant. However, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant with incorporation of the following subsequent EIR mitigation measures:

 Lawrence Station SP EIR – See Mitigation Measure CUL-5.  Tasman East SP EIR – See Mitigation Measures CUL-1.1, CUL-1.2, and CUL-1.3.  Patrick Henry Drive SP EIR – See Mitigation Measure 7-2.  Freedom Circle FFA EIR – See Mitigation Measure 7-3.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts rela ted to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to buried human remains. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

Cumulative Impacts

The General Plan EIR found that projects in the City and other cumulative projects in the area would implement mitigation that avoids or substantially lessens potentially significant impacts to cultural resources, as required by State law. These mitigation strategies would typically involve pre-construction identification surveys; significance evaluations; consultation with tribal descendant communities; culturally and legally appropriate treatment of human remains; archaeological construction monitoring; resource documentation; and data recovery for unavoidable impacts. These mitigation strategies would generally avoid or substantially lessen the severity of impacts to cultural resources. Therefore, the General Plan EIR determined that the City’s contribution to cumulative effects associated with cultural 4 – Evaluation of Environmental Impacts
46 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
resources is less than cumulatively considerable and impacts would be less than significant. In addition, the subsequent Specific Plan EIRs for the Lawrence Station SP and the Tasman East SP determined that cumulative cultural resources impacts would be less than significant with incorporation of subsequent EIR mitigation measures.

The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amend ed General Plan would be required to perform environmental review pursuant to CEQA. The proposed project would be required to implement subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed project would not result in a greater impact on cultural resources than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative cultural resources impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to cult ural resources impacts.

However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. Subsequent Specific Plan EIR mitigation measures, as referenced above and listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan. With incorporation of subsequent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect on any historical resources, cultural resources, or buried human remains. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that re quire major revisions to the General Plan EIR or subsequent Specific Plan EIRs . As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

Lawrence Station SP EIR: CUL-1, CUL-2, CUL -3, and CUL -5.

Tasman East SP EIR: CUL-1.1, CUL-1.2, and CUL-1.3.

Patrick Henry Dr. SP EIR: 7-1 and 7-2.

Freedom Circle FFA EIR: 7-1, 7-3, and 7-4.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 47
City of Santa Clara

4.8 – Energy
Would the project:

Effect
Examined in
General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Result in potentially
significant environmental
impact due to wasteful,
inefficient, or unnecessary
consumption of energy
resources, during project
construction or operation?
Yes
Less than
Significant
Impact
No No No
b) Conflict with or
obstruct a state or local
plan for renewable energy
or energy efficiency??
Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a-b) Energy Consumption. The General Plan EIR found that while the substantial new residential, commercial, and industrial development allowed under the 2010 -2035 General Plan would result in increased overall consumption of energy compared to existing levels, new development would not consume energy in a manner that is wasteful, inefficient, or unnecessary. In addition, it was found that policies in the General Plan would serve to reduce growth in energy consumption to the extent feasible.

It was also found that new construction would be required to meet Title 24 building energy efficiency standards, including the new CALGreen requirements. In addition, the General Plan EIR noted that the Climate Action Plan (discussed in Section 4.16 Climate Change of the General Plan EIR) would focus on efforts to i ncrease energy conservation and efficiency as a means of reducing greenhouse gas emissions. Therefore, the General Plan EIR determined that the 2010-2035 General Plan would result in less than significant impacts. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA also found that impacts would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in excessive energy use or conflict with state and local renewable energy or energy efficiency plans . Implementati on of the proposed project would not result in a greater energy impact than was previously analyzed in the General Plan 4 – Evaluation of Environmental Impacts
48 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR noted that the geographic area for cumulative energy impacts is the State of California, which includes the areas serviced by electrical and natural gas utility providers. The General Plan EIR also noted that Section 4.16 Climate Change of the General Plan EIR provides Plan -level analysis that places the 2010-2035 General Plan’s growth within the cumulative context for California’s 2020 and 2050 climate change goals. As discussed in the Climate Change section of the General Plan EIR, the City is committed to the preparation and implementation of a Climate Action Plan to ensure the proposed General Plan would be consistent with the state’s 2020 emissions targets, and would contribute a less than cumulatively considerable amount toward futur e GHG levels. Achieving 2020 emissions levels will necessarily entail increased energy conservation and efficiency, and utilization of renewable sources. In addition to Santa Clara, it was noted that the cities of San Jose and Sunnyvale were (at the time) each developing Climate Action Plans to address their respective 2020 emissions. In addition, all other projects constructed within Santa Clara, including projects under subsequent Specific Plans, are required to comply with the policies of the General Plan, plus existing local, state and federal regulations to prevent the inefficient use of energy. Finally, it was found that future development within the electrical and natural gas utility providers’ service area would also be required to adhere to applicable local regulations, including the provisions of Title 24, designed to prevent the wasteful, inefficient, or unnecessary use of energy. Therefore, the General Plan EIR determined that cumulative impacts to energy from development under the General Plan wo uld be less than significant with compliance to relevant legislative regulations and General Plan policies. In addition, the subsequent EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that cumulative energy impacts would be less than significant.

The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Pl an would be required to perform environmental review pursuant to CEQA. The City is currently implementing its 2022 Climate Action Plan to ensure consistency with the state’s 20 30 emissions targets. Achieving 20 30 emissions levels would result in increased energy conservation and efficiency, and utilization of renewable sources.

Implementation of the proposed project would not result in a greater energy impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative energy impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development und er the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to energy impacts. However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. Therefore, the proposed project would not result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumptio n of energy resources, during project construction or operation nor would it conflict with or obstruct a state or local plan for renewable energy or energy efficiency . No new significant impacts and no substantial increase in the severity of previously ide ntified impacts associated with the proposed project would occur. Likewise, 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 49
City of Santa Clara
there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs . As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

There are no applicable General Plan EIR or subsequent Specific Plan EIR mitigation measures.

4 – Evaluation of Environmental Impacts
50 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

4.9 – Geology and Soils
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Directly or indirectly
cause potential
substantial adverse
effects, including the risk
of loss, injury, or death
involving:

i) Rupture of a
known earthquake
fault, as delineated on
the most recent
Alquist-Priolo
Earthquake Fault
Zoning Map issued by
the State Geologist
for the area or based
on other substantial
evidence of a known
fault? Refer to
Division of Mines and
Geology Special
Publication 42.

Yes
Less than
Significant
Impact
No No No
ii) Strong seismic
ground shaking? Yes
Less than
Significant
Impact
No No No
iii) Seismic-related
ground failure,
including liquefaction?
Yes
Less than
Significant
Impact
No No No
iv) Landslides?
Yes
Less than
Significant
Impact
No No No
b) Result in substantial
soil erosion or the loss of
topsoil?
Yes
Less than
Significant
Impact
No No No
c) Be located on a
geologic unit or soil that is
unstable, or that would
become unstable as a
result of the project, and
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 51
City of Santa Clara
potentially result in on- or
off-site landslide, lateral
spreading, subsidence,
liquefaction or collapse?
d) Be located on
expansive soil, as defined
in Table 18-1-B of the
Uniform Building Code
(1997), creating
substantial direct or
indirect risks to life or
property?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
e) Have soils incapable
of adequately supporting
the use of septic tanks or
alternative waste water
disposal systems where
sewers are not available
for the disposal of waste
water?
Yes No Impact No No No
f) Directly or indirectly
destroy a unique
paleontological resource
or site or unique geologic
feature?
Yes
Less than
Significant
with Mitigation
Incorporated
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a.i) Fault Rupture. The General Plan EIR noted that the City does not contain any faults mapped as Alquist-Priolo Earthquake Fault zones. There are also no other faults that extend through the City.

Because there are no known active earthquake faults within the limits of the City of Santa Clara , the risk for surface fault rupture is considered low within the City . Therefore, the General Plan EIR determined that this impact would be less than significant. In addition, the subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant fault-related impacts.

Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(a.ii) Strong Seismic Ground Shaking . The General Plan EIR noted that b ecause the City is in relatively close proximity to several major fault zones, the California Building Code, as adopted by the City of Santa Clara , requires that seismic design features be incorporated in construction and 4 – Evaluation of Environmental Impacts
52 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
redevelopment projects in Santa Clara. The primary purpose of the seismic design requirements of the building code is to avoid loss of life. Therefore, the General Plan EIR determined that this impact would be less than significant with adherence to existing regulations. In addition, the subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to seismic ground shaking. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(a.iii) Seismic-Related Ground Failure /Liquefaction. The General Plan EIR noted that under the County of Santa Clara Hazard Mapping, most of Santa Clara is considered susceptible to liquefaction hazards (refer to Figure 4.5 -3), and development and redevelopm ent allowed under the 2010 -2035 General Plan would occur within these areas. In addition, it was noted that there are areas near creeks, such as along the Guadalupe River, where lateral spreading could occur. As such, it was found that future projects approved under the 2010-2035 General Plan within the liquefaction hazard area would be required under the Seismic Hazard Mapping Program and building code and City Code requirements to evaluate site -specific liquefaction and ground failure hazards and mitigate those hazards to an acceptable level. Therefore, the General Plan EIR determined that this impact would be less than significant with adherence to existing regulations. In addition, the subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significan t impacts related to seismic-related ground failure and liquefaction. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(a.iv) Landslides/Seismically-Induced Waves. The General Plan EIR noted that because the City is located on gently sloping and nearly flat valley floor topography, it is not subject to risk of landslides; and the landslide hazard mapping compiled by the County of Santa Clara shows the City is outside the landslide hazard zone. Therefore, it was determined that there are no areas within the City susceptible to landslides. The General Plan EIR also noted that b ecause the City is not located within a tsunami inundation area, development and redevelopment anticipated under the General Plan would not be exposed to substantial risks associated with tsunamis. Locally, the General Plan EIR found that seiches due to seismic shaking could occur in shallow lakes, reservoirs, or percolation ponds in Santa Clara 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 53
City of Santa Clara
and the surrounding area, and sloshing of water out of a lake or basin onto the surrounding area could result in water damage, erosion and some slope failure. However, it was found that there are no lakes or reservoirs within the City, but several ponds, including the City’s two retention basins, (located near State Route 237 and the Union Pacific Railroad Line, and the Great America Parkway and San Tomas Aquino Creek). It was also found that L exington Reservoir, which is located approximately nine miles from the City, could be susceptible to seiche. However, the potential for loss of life from this hazard is low. Therefore, the General Plan EIR determined that this impact would be less than significant. In addition, the subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to landslides or seismically-induced waves. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(b) Soil Erosion. The General Plan EIR noted that g rading and ground disturbance increases the potential for accelerated erosion by removing protective vegetation or cover and changing natural drainage patterns. However, it was also noted that for future development over one acre in size, erosion hazards would be minimized through implementation of site -specific erosion measures in SWPPPs under the NPDES General Construction Permit and grading and excavation requirements in the City Code. Given that many future development projects would be on properties less than one acre, it was further noted that requirements for BMPs under the City ’s NPDES M unicipal Permit, urban runoff policies, and the City Code would be the primary means of enforcing erosion control measures through the grading and building permit process. Therefore, with the regulatory programs currently in place, the General Plan EIR det ermined that possible impacts of accelerated erosion during construction associated with development and redevelopment would be less than significant. In addition, the subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impact s related to soil erosion. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(c) Unstable Geologic Unit. The General Plan EIR found that development under the 2010 -2035 General Plan would be required to incorporate the seismic design f eatures of the California Building Code in construction and redevelopment projects in Santa Clara . Therefore, the General Plan EIR 4 – Evaluation of Environmental Impacts
54 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
determined that th is impact would be less than significant. In addition, the subsequent Specific Plan EIR for the Tasman East SP determined that this impact would be less than significant. However, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle FFA determined that the following mitigation measures are required to reduce potentially significant impacts to less than significant:

 Patrick Henry Drive SP EIR – See Mitigation Measures 8-3 and 8-4.  Freedom Circle FFA EIR – See Mitigation Measures 8-5 and 8-6.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to an unstable geologic unit or soils. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(d) Expansive Soils. The General Plan EIR noted that soil and geologic hazards of concern in the City of Santa Clara are primarily related to expansive soils, weak soils, and artificial fill and the City primarily consists of well-drained loamy soils formed on alluvial sediments. It was also noted that soils include loam and clay loam at the surface and in the very shal low subsurface, overlying gravelly sandy clay loam and fine sandy clay loam present at depth and such units are typically moderate to very highly expansive. It was further noted that in general, alluvial fan sediments become increasingly finer grained with greater distance from the mountains and because of this expansion potential is generally moderate in the southern city’s alluvial fan and plain soils and high in the alluvial plain/valley floor soils of the northern city. The General Plan EIR also found that where expansive soils are present, foundations and pavements can be damaged when solids go through cycles of wetting and drying. Weak compressible soils are located at the City’s northernmost edge and weak soils can compress, collapse, or spread laterally under the weight of buildings and fill. It was also noted that artificial fill has been placed under buildings throughout the City, and non-engineered fill can result in excessive settlement of structures, pavement, and utilities. It was found that bec ause the City is located on gently sloping and nearly flat valley floor topography, it is not subject to risk of landslides; landslide hazard mapping compiled by the County of Santa Clara shows the City is outside the landslide hazard zone. Therefore, the General Plan EIR determined that there are no areas within the City susceptible to landslides. The General Plan EIR found that new development under the 2010-2035 General Plan would occur primarily as intensification of previously developed areas throughout the City and hazards associated with expansive soils, weak soils, and artificial fill would be reduced and managed consistent with city adopted regulations and policies, in combination with State building regulations. In addition, it was noted that the 2 010-2035 General Plan includes updated hazards policies that address geologic and seismic hazards and provide program-level mitigation for geologic, soil and landslide hazards within the City. While the General Plan EIR determined that new development and redevelopment allowed under the 2010- 2035 General Plan could occur in areas with identified soil hazards, implementation of General Plan policies and existing regulations and programs would substantially reduce hazards to people and property. Therefore, the General Plan EIR determined this impact would be less than significant. In addition, the subsequent Specific Plan EIR for the Tasman East SP determined that this impact would be less than significant.

However, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 55
City of Santa Clara
FFA determined that the following mitigation measures are required to reduce potentially significant impacts to less than significant:

 Patrick Henry Drive SP EIR – See Mitigation Measure 8-3.  Freedom Circle FFA EIR – See Mitigation Measure 8-6.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including su bsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to expansive soils. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(e) Septic Systems. The General Plan EIR did not analyze impacts related to septic systems. However, the subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that no impact would occur because the Planning Area is served by a comprehensive, integrated wastewater collection, treatment, and disposal system.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the imp acts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to septic systems. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(f) Paleontological Resources. The General Plan EIR found that new development and redevelopment under the 2010 -2035 General Plan has the potential to directly or indirectly destroy a unique paleontological resource or unique geologic feature. However, the General Plan EIR found that implementation of General Plan policies and existing programs would minimize this effect. Therefore, the General Plan EIR determined that impacts would be less than significant. However, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that the following subsequent EIR mitigation measures would be required to reduce potentially significant impacts to less than significant:

 Lawrence Station SP EIR – See Mitigation Measure CUL-4.  Tasman East SP EIR – See Mitigation Measure CUL-2.1.
 Patrick Henry Drive SP EIR – See Mitigation Measure 8-4.  Freedom Circle FFA EIR – See Mitigation Measures 8-7 and 8-8

4 – Evaluation of Environmental Impacts
56 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to paleontological resources. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

Cumulative Impacts

The General Plan EIR found that geologic conditions are highly localized and implementation of the 2010-2035 General Plan would generally not result in cumulative geologic impacts, unless growth under the Plan would exacerbate a regional cumulative geologic issue (e.g., fault zone, massive landslide) affecting an extensive area covering multiple jurisdictions. There are no such regional geologic features in Santa Clara. Therefore, the General Plan EIR determined that the City’s contribution to regional cumulative impacts relate d to geology and soils, would be less than significant . In addition, the subsequent Specific Plan EIR for the Tasman East SP determined that cumulatively considerable geology and soils impacts would be less than significant.

The Planning Area is completel y urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed . The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA. The proposed project wo uld be required to implement subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed project would not result in a greater geology and soils impacts than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative geology and soils impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to geology and soils impacts. However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. Subsequent Specific Plan EIR mitigation measures, as referenced above and listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan. With incorporation of subsequent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect related to geology and soils. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required. 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 57
City of Santa Clara
Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

Lawrence Station SP EIR: CUL-4.

Tasman East SP EIR: CUL-2.1.

Patrick Henry Dr. SP EIR: 8-6, 8-7, and 8-8.

Freedom Circle FFA EIR: 8-3, 8-4, 8-5, 8-6, 8-7, and 8-8.

4 – Evaluation of Environmental Impacts
58 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

4.10 – Greenhouse Gas Emissions
Would the project:

Effect
Examined in
General Plan
EIR and
Subsequent
EIRs?

Conclusion
in General
Plan EIR and
Subsequent
EIRs?
Proposed
Changes
Involving New
or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing New
or More
Severe
Impacts?
a) Generate
greenhouse gas
emissions, either
directly or indirectly,
that may have a
significant impact on
the environment?
Yes
Less Than
Significant
with
Mitigation
Incorporated
No No No
b) Conflict with an
applicable plan, policy
or regulation adopted
for the purpose of
reducing the emissions
of greenhouse gases?
Yes
Significant
Unavoidable
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

a) Greenhouse Gas Emissions. The General Plan EIR determined that the City’s projected 2020 GHG emissions, without further reduction via a Climate Action Plan, would constitute a cumulatively considerable contribution to global climate change by exceeding the average carbon-efficiency standard necessary to meet statewide 2020 goals as established by AB 32. It was also determined that citywide 2035 GHG emissions are projected to exceed efficiency standards necessary to maintain a trajectory to meet long -term 2050 state climate change reduction goals. However, achieving the substantial emissions reductions will require policy decisions at th e federal and state level and new and substantially advanced technologies that cannot today be anticipated, and are outside the City’s control, and therefore cannot be relied upon as feasible mitigation strategies. Therefore, given the uncertainties about the feasibility of achieving the substantial 2035 emissions reductions, the General Plan EIR determined that the City ’s contribution to climate change for the 2035 timeframe is significant and unavoidable. In addition, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, and the Patrick Henry Drive SP determined that this impact would be less than significant.

However, the subsequent Specific Plan EIR for the Freedom Circle FFA determined that the following mitigation measures are required to reduce potentially substantial impacts to less than significant:

 Freedom Circle FFA EIR – See Mitigation Measures 9-1A and 9-1B.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 59
City of Santa Clara
required to perform environmental review to ensure they do not result in significant impacts related to greenhouse gas emissions. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than signi ficant impacts with incorporation of the mitigation measure listed above.

b) Conflict with Applicable Plan. The General Plan EIR determined that the City’s projected 2035 GHG emissions would constitute a cumulatively considerable contribution to global climate change by exceeding the average carbon-efficiency standard necessary to maintain a trajectory to meet statewide 2050 goals as established by EO S-3-05. Therefore, the General Plan EIR determined that this impact would be significant and unavoidable . However, the subsequent Specific Plan EIR s for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in conflicts with applicable plans, policies, or regulations adopted for the purpose of reducing the emissions of greenhouse gases. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR found that citywide 2035 GHG emissions are projected to exceed efficiency standards necessary to maintain a trajectory to meet long -term 2050 state climate change reduction goals. However, it was found that achievin g the substantial emissions reductions will require policy decisions at the federal and state level and new and substantially advanced technologies that cannot today be anticipated, and are outside the City’s control, and therefore cannot be relied upon as feasible mitigation strategies. Therefore, given the uncertainties about the feasibility of achieving the substantial 2035 emissions reductions, the General Plan EIR determined that the City’s contribution to climate change for the 2035 timeframe is conservatively determined to be cumulatively considerable. However, the subsequent Specific Plan EIR for the Tasman East SP determined that cumulative GHG emissions impacts would be less than significant.

The Planning Area is completely urbanized and most of t he Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do n ot include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA. The proposed project would be required to implement subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed project would not result in a greater greenhouse gas emissions impacts than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative greenhouse gas emissions impact from the proposed project would be less than significant.

4 – Evaluation of Environmental Impacts
60 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to greenhouse gas emissions impacts.

However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. Subsequent Specific Plan EIR mitigation measures, as referenced above and listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan. With incorporation of subsequent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect related to greenhouse gas emissions. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new a nalysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

Freedom Circle FFA EIR: 9-1A and 9-1B.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 61
City of Santa Clara

4.12 – Hazards and Hazardous Materials
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or
More
Severe
Impacts?

New
Circumstances
Involving New
or More
Severe
Impacts?
New
Information
Showing
New or
More
Severe
Impacts?
a) Create a significant
hazard to the public or the
environment through the
routine transport, use, or
disposal of hazardous
materials?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
b) Create a significant
hazard to the public or the
environment through
reasonably foreseeable upset
and accident conditions
involving the release of
hazardous materials into the
environment?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
c) Emit hazardous emissions
or handle hazardous or
acutely hazardous materials,
substances, or waste within
one-quarter mile of an existing
or proposed school?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
d) Be located on a site which
is included on a list of
hazardous materials sites
compiled pursuant to
Government Code Section
65962.5 and, as a result,
would it create a significant
hazard to the public or the
environment?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
e) For a project located
within an airport land use plan
or, where such a plan has not
been adopted, within two
miles of a public airport or
public use airport, would the
project result in a safety
hazard or excessive noise for
people residing or working in
the project area?
Yes
Less than
Significant
Impact
No No No
4 – Evaluation of Environmental Impacts
62 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
f) Impair implementation of
or physically interfere with an
adopted emergency response
plan or emergency evacuation
plan?
Yes
Less than
Significant
Impact
No No No
g) Expose people or
structures, either directly or
indirectly, to a significant risk
of loss, injury or death
involving wildland fires?
Yes No Impact No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a-c) Hazardous Materials Use/Potential for Accidental Releases. The General Plan EIR noted that the 2010-2035 General Plan allows for a greater mix of uses, including location of residential uses in proximity to businesses which could expose sensitive receptors to hazardous materials used, stored or disposed of as waste by industrial or in some cases, commercial, operations. It was also noted tha t hazardous materials presently stored and used in Santa Clara include flammable liquids, acids, and similar substances, and that some of these substances are routinely transported and kept in large enough amounts that improper handling or an accidental sp ill or leak could result in off -site consequences that could adversely impact nearby workers or the public. It was further noted that placement of additional sensitive receptors near facilities that could have an accidental release of a hazardous substance that would have off-site consequences, or conversely, location of a new industrial, commercial or institutional use that uses or stores toxic substances near sensitive receptors, including within ¼ mile of schools, could increase the risk of adverse health effects in the event of an accidental release. In addition to housing, it was found that new sensitive receptors such as schools and day care centers will be developed within the General Plan Focus Areas. As such, it was determined that new development and redevelopment allowed under the 2010 - 2035 General Plan could place sensitive uses in proximity to industrial, commercial or institutional hazardous materials users, and an accidental release of hazardous materials that travels off-site could pose health or safety risks to these sensitive land uses. However, it was found that the 2010-2035 General Plan includes updated hazards policies that address proper hazardous materials use and storage and the proximity of sensitive uses to substantial hazards from accidental release of hazardous materials and provide program -level mitigation for risks associated with the use, storage, and disposal of hazardous materials within the City. Therefore, the General Plan EIR determined that i mplementation of General Plan policies for adequate mitigation or separation buffers between uses and existing regulations and programs would substantially reduce hazards to people and the environment to less than significant . Similarly, the subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that impacts would be less than significant . However, the subsequent Specific Plan EIR for the Lawrence Station SP determined that the following mitigation measures are required to reduce potentially substantial impacts to less than significant:

 Lawrence Station SP EIR – See Mitigation Measure HAZ-1, HAZ-2, and HAZ-3.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 63
City of Santa Clara
required to perform environmental review to ensure they do not result in significant impacts related to the routine transport, use, or disposal of hazardous materials. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR an d subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(d) Hazardous Materials per Government Code Section 65962.5. The General Plan EIR found that the presence of hazardous materials on future development and redevelopment sites could result in hazardous materials exposure of construction workers during site preparation, demolition, and/or construction of new structures. Contaminated airborne dust could also migrate off-site during demolition or construction activities and affect adjacent land uses if improperly controlled. It was further found that within Santa Clara a variety of chemical compounds associated with fuels, oil, flammable liquids, metals, pesticides or other hazardous substances originating from historical and/or current land uses may be found in soils that will be disturbed by future development or redevelopment. It was also noted that releases of hazardous materials, such as volatile organic compounds and metals, into the environment could affect future residents or users through direct contact or, in the case of volatile organic compounds, inhalation of soil vapors. The General Plan EIR noted that contaminated groundwater, where encountered during site redevelopment activities, could also result in potential health risks to construction workers or the public, and if excavations extend to the groundwater table, dewatering could be required and extracted contaminated groundwater would require on -site management and/or treatment. Additionally, it was found that potentially hazardous environmental conditions from reported hazardous materials spills and releases are found in virtually all of the Focus Areas of the City. While a number of these reports represent cases considered closed by Responsible Agencies such as the Regional Water Quality Control Board, where there are changes in land uses or excav ation into contaminated areas, a reevaluation of potential hazards and soil or groundwater management may be warranted. It was also found that d evelopment and redevelopment allowed under the 2010 -2035 General Plan could occur on or near contaminated properties located throughout the city, and localized contamination of soil, soil vapor and ground water could adversely impact human health or the environment if not appropriately addressed and/or mitigated.

The General Plan EIR went on to note that remodel and repair activity, and demolition work in residential and commercial structures that disturbs asbestos-containing building materials may cause the release of asbestos fibers into the air, resulting in health impacts to workers, building occupants and the general public. It was also noted there is no known health threat if asbestos-containing materials are in generally good condition and are left undisturbed, and friable asbestos-containing material (i.e., material that can be crumbled, crushed or reduced to powder by hand pressure when dry) and non -friable asbestos- containing material that will be made friable during renovation or demolition are subject to regulation.

As such, it was found that the National Emissions Standards for Hazardous Air Pollutants (NESHAP) guidelines require the removal of potentially friable asbestos -containing material prior to building demolition or renovation that may disturb these materials. In addition, the General Plan EIR found that demolition and renovation of buildings als o have the potential to release lead particles to the air, resulting in health impacts to workers, building occupants and the general public. As such , it was determined that applicable OSHA regulations must be followed; these include requirements for worker training, air monitoring and dust control, among others, and any debris or soil containing lead must be disposed appropriately. Finally, the General Plan EIR found that new development and redevelopment allowed under the 2010- 2035 General Plan could occur in areas with soil or groundwater contamination or involve demolition of buildings containing hazardous building materials. Therefore, the General Plan EIR determined that this impact would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and Freedom Circle FFA determined that this impact would be less than significant. However, the subsequent Specific Plan EIRs for the Lawrence Station SP and the 4 – Evaluation of Environmental Impacts
64 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
Tasman East SP determined that the following mitigation is required to reduce potential impacts from hazardous materials to less than significant:

 Lawrence Station SP EIR – See Mitigation Measure HAZ-2 and HAZ-3.  Tasman East SP EIR – See Mitigation Measures HAZ-1.1, HAZ-1.2, HAZ-1.3, HAZ-1.4, HAZ-

1.5, and HAZ-1.6.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts r elated to Government Code Section 65962. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subseq uent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(e) Airport Land Use Plan. The General Plan EIR found that new development and redeve lopment allowed under the 2010- 2035 General Plan could occur in localized areas with identified building height and safety restrictions for Mineta San Jose International Airport. However, the General Plan EIR determined that implementation of General Plan policies and existing regulations and programs would substantially reduce aviation hazards to people and property . Therefore, the General Plan EIR determined that impacts would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would either not occur or would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, t he impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in conflicts with airport land use plans. In addition, the Zoning code addresses potential height conflicts with airport uses by limiting heights in industrial districts to the maximum allowed under the FAA’s part 77 surfaces. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(f) Emergency Plans. The General Plan EIR noted that the City of Santa Clara Hazardous Materials Division responds to emergency calls related to hazardous materials within the City, and the City also participates in the ABAG Local Hazards Plan and also has adopted a City of Santa Clara Emergency Plan (2008). The General Plan EIR also noted that the City does not maintain formal evacuation routes, as the most appropriate routes away from an area that may have been affected by a major disaster would be determined by the location and type of incident. It was determined that it may be necessary to restrict travel on certain roadways within the redevelopment and development areas under the 2010- 2035 General Plan to facilitate construction activities such as demolition, material hauling, construction, staging, and modifications to existing infrastructure, and such restrictions could include lane closures, 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 65
City of Santa Clara
lane narrowing, and detours, which would be temporary but could continue for extended periods of time.

As such, it was found that lane restrictions, closures, and/or detours could cause an increase in traffic volumes on adjacent roadways, which could affect emergency response routes. However, the General Plan EIR determined that redevelopment and development under the 2010- 2035 General Plan would include preparation a Traffic Management Plan, which would demonstrate where construction activities could interfere with emergency response routes and other traffic. With this information, the City is able to adequately plan around potential blocks in emergency right-of-way and would have the right to deny or halt construction activities if they would result in an adverse impact on public safety. Therefore, the General Plan EIR determined that implementation of General Plan policies and existing regulations and programs, would substantially reduce the impairment of emergency response plans to less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP and the Tasman East SP determined that this impact would either not occur or would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in conflicts with emergency response or evacuation plans . Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(g) Wildfire Risks. The General Plan EIR noted that the California Department of Forestry and Fire Hazard Protection is responsible for the identification of very high fire hazard severity zones and transmission of these maps to local government agencies, and found that there are no wildfire hazards in the City of Santa Clara . Therefore, the General Plan EIR determined there would be no project impacts related to wildland fires.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in risks related to wildfire .

Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR noted that hazardous materials and other public health and safety issues are generally site -specific or affect localized areas and would not be significantly affected by other development in northern Santa Clara County. Therefore, the General Plan EIR determined that the City’s contribution to regional cumulative impacts related to hazards and hazardous materials would be less than significant. Similarly, the subsequent Specific Plan EIR for the Tasman East SP determined that cumulative hazards and hazardous materials impacts would be less than significant. 4 – Evaluation of Environmental Impacts
66 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Co de and amended General Plan would be required to perform environmental review pursuant to CEQA. The proposed project would be required to implement subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed p roject would not result in a greater hazards and hazardous materials impacts than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative hazards and hazardous materials impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to hazards and hazardous materials impacts. However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigat ion, if required. Subsequent Specific Plan EIR mitigation measures, as referenced above and listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan. With incorporation of subsequent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect related to hazards and hazardous materials. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs . As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

Lawrence Station SP EIR: HAZ-1, HAZ-2, and HAZ-3.

Tasman East SP EIR: HAZ-1.1, HAZ-1.2, HAZ-1.3, HAZ-1.4, HAZ-1.5, and HAZ-1.6.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 67
City of Santa Clara

4.13 – Hydrology and Water Quality
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Violate any water quality
standards or waste
discharge requirements or
otherwise substantially
degrade surface or ground
water supply?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
b) Substantially decrease
groundwater supplies or
interfere substantially with
groundwater recharge such
that the project may impede
sustainable groundwater
management of the basin?
Yes
Less than
Significant
Impact
No No No
c) Substantially alter the
existing drainage pattern of
the site or area, including
through the alteration of the
course of a stream or river,
or through the addition of
impervious surfaces, in a
manner which would:

i) result in substantial
erosion or siltation on-
or off-site;
Yes
Less than
Significant
Impact
No No No
ii) substantially
increase the rate or
amount of surface runoff
in a manner which
would result in flooding
on- or off-site;
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
iii) create or contribute
runoff water which
would exceed the
capacity of existing or
planned stormwater
drainage systems or
provide substantial
additional sources of
Yes
Less than
Significant
Impact
No No No
4 – Evaluation of Environmental Impacts
68 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
polluted runoff; or
iv) impede or redirect
flood flows? Yes
Less than
Significant
Impact
No No No
d) In flood hazard,
tsunami, or seiche zones,
risk release of pollutants
due to project inundation?
Yes
Less than
Significant
Impact
No No No
e) Conflict with or obstruct
implementation of a water
quality control plan or
sustainable groundwater
management plan?
Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Violate Water Quality Standards or Degrade the Water Supply. The General Plan EIR found that ground-disturbing activities related to construction under the 2010 -2035 General Plan could result in accelerated erosion on work sites including increased input of fine sediments into the City’s storm drains and ultimately into area creeks and the Bay. It was also found that construction would use various hazardous substances such as vehicle fuels and lubricants, paving media, paints, sol vents, etc.; accidental release or discharge of any of these substances could adversely affect water quality, endanger aquatic life, and/or result in violation of water quality standards. The General Plan EIR noted that all construction on sites of one acre or larger is required to manage discharge of storm water runoff under the Clean Water Act, through the preparation and implementation of a SWPPP. It was also noted that for future development over one acre in size, erosion hazards would be minimized thro ugh implementation of site-specific erosion measures in SWPPPs under the NPDES General Construction Permit and grading and excavation requirements in the City Code. However, given that many future development projects would be on properties less than one acre in size, it was noted that requirements for BMPs under the City’s NPDES Municipal Permit, urban runoff policies, and the City Code would be the primary me ans of enforcing erosion control measures through the grading and building permit process. Additionally, it was noted that the City is committed to ensuring that construction -related grading complies with the erosion and sediment control BMPs set forth in the California Storm Water Quality Association’s (CASQA) Storm Water Best Management Practice Handbook for Construction and with the erosion and sediment control plan recommendations of the ABAG Manual of Standards for Erosion and Sediment Control Measures . With regulatory programs currently place, the General Plan EIR determined that the possible impacts of accelerated erosion during construction associated with development and redevelopment would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that with implementation of existing regulations this impact would either not occur or be less than significant.

The General Plan EIR noted that new impervious surfaces can increase the delivery of polluted runoff to area storm drains and ultimately to San Francisco Bay , and t his is especially true during the “first flush” at the beginning of the storm season, when u rban pollutants that have accumulated during the dry season are washed from paved surfaces. However, the General Plan EIR also noted that the City adheres to the terms of the NPDES permitting, which requires all developments that create one acre or more of impervious surface to incorporate design measures to reduce pollutant discharge to the maximum extent practicable, including site design measures, source controls, and storm water treatment measures that municipalities are to require of developments to en sure water quality. Given 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 69
City of Santa Clara
that many future development projects would be on properties less than one acre, requirements under the City’s NPDES Municipal Permit, urban runoff policies, and the City Code would be the primary means of enforcing control measures after development is complete. With regulatory programs currently in place, the General Plan EIR determined that the possible impacts of accelerated runoff and decrease in water quality after c onstruction is complete for the development and redevelopment would be less than significant. Therefore, the General Plan EIR determined that i mplementation of General Plan policies and existing programs would minimize water quality hazards to be less than significant.

Similarly, the subsequent Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that with implementation of existing regulations this impact would either not occur or be less than significant. However, the subsequent Specific Plan EIR for the Lawrence Station SP determined that the following mitigation measure is required to reduce this impact to less than significant:

 Lawrence Station SP EIR – See Mitigation Measure HYD-1.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts water quality or supply impacts. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measure listed above.

(b) Groundwater Supplies. The General Plan EIR found that new development and redevelopment under the 2010-2035 General Plan would have the potential to add new areas of impervious (paved or hardscaped) surface to the City , potentially decreasing infiltration and local recharge of shallow groundwater. However, it was also found that only a very small portion of the City (about 26 acres at the City’s southwest corner) is within the recharge area for the potable water aquifer, and this area is developed as residential. It was further found that some regional commercial development was planned for this area, but it would be infill and redevelopment in areas that have previously been developed. As such, the net addition of impervious surface area was expected to be small, and would be further reduced by the minimization of paved and impervious surfaces and the promotion of measures to facilitate infiltration in conformance with the requirements under section C.3 of the NPDES Permit.

Therefore, given the City’s existing developed and extensively hardscaped cha racter, limited overall influence on potable aquifer recharge, and the 2010 -2035 General Plan commitment to minimize hardscape and promote infiltration, the General Plan EIR determined that impacts related to interference with groundwater recharge would be less than significant . Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that impacts would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impact s related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to 4 – Evaluation of Environmental Impacts
70 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
groundwater supplies. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(c.i-c.iv) Alter Drainage Patterns. The General Plan EIR noted that d evelopment often requires grading that alters natural drainage patterns. I t was also noted that i n the City, as in other densely developed Bay Area communities, natural drainage patterns have already been substantially modified to accommodate existing development. It was further noted that a dditional infill and redevelopment under the 2010-2035 General Plan could entail further modification , and both the City’s industrial and commercial areas are expected to change from lower to higher intensity development. The General Plan EIR found that new development within the Planning Area would result in some potential for increased erosion and siltation both on - and off -site because g rading and ground disturbance associated with development in these areas could increase the potential for accelerated erosion by changing natural drainage patterns. As such, the General Plan EIR found that for all future development and redevelopment on sites that are one acre or greate r in size, erosion hazards would be minimized through implementation of site -specific erosion measures in SWPPPs under the NPDES General Construction Permit and grading and excavation requirements in the City Code. It was further found that future development projects on properties of less than one acre would be subject to requirements for BMPs under the City’s NPDES Municipal Permit, urban runoff policies, and the City Code, and the primary means of enforcing erosion control measures are thro ugh the grading and building permit process. Finally, it was found that the City also implements the "Guidelines and Standards for Lands Near Streams" in the City's entitlement and permitting functions, where applicable. Therefore, w ith regulatory programs currently in place, the General Plan EIR determined that possible impacts of accelerated erosion during construction associated with development and redevelopment would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

The General Plan EIR went on to note that development proposed under the 2010-2035 General Plan would occur adjacent to water courses throughout the City, which has the potential to alter the course of the drainage pattern near the stream or river and increase flooding. It was also noted that extensive site modifications would have some potential to increase local site runoff and/or contribute to localized flooding, particularly where high density and mixed uses generally increases the percentage of impermeable surfaces. However, the General Plan EIR found that these hazards would be minimized through implementation of site-specific measures in SWPPPs under the NPDES General Construction Permit and by grading and excavation requirements in the City Code. Given that many future development projects would be on properties less than one acre, it was noted that requirements for BMPs under the City’s NPDES Municipal Permit, urban runoff policies, and the City Code would be the primary means of enforcing control measures through the grading and building permit process.

Therefore, with regulatory protections in place, the General Plan EIR determined that impacts related to increases in surface runoff would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

The General Plan EIR noted that a lthough the City is largely built out, development under the 2010 - 2035 General Plan would add quantities of impervious surface (including both buildings and pavement), potentially decreasing infiltration and increasing runoff. However, it was noted that for future development over one acre in size, storm water runoff would be minimized through implementation of site-specific measures in SWPPPs under the NPDES General Construction Permit and grading and excavation requirements in the City Code. In addition, g iven that many future development projects 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 71
City of Santa Clara
would be on properties less than one acre, it was noted that requirements for BMPs under the City’s NPDES Municipal Permit, urban runoff policies, and the City Code would be the primary means of enforcing control measures through the grading and building permit process. The General Plan EIR further noted that the City Code and building code include provisions for postconstruction effective management of storm water runoff. Therefore, with regulatory programs currently in place, the General Plan EIR determined that potential impacts of additional runoff to the storm water drainage system associated with developm ent and redevelopment would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant. However, the subsequent Specific Plan EIR for the Tasman East SP determined that the following mitigation measure is required to reduce potential impacts from on- or off-site flooding to less than significant:

 Tasman East SP EIR – See Mitigation Measures HYD-1.1.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to spec ific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to altered drainage patters. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(d) Other Water-Related Risks or Pollution. The General Plan EIR found that new development and redevelopment under the 2010 -2035 General Plan would have the potential to expose people or structures to increased risk of loss, injury, or death related to flooding, mudflow, debris flow, sea level rise, tsunami, or seiche. However, the General Plan EIR determined that implementation of General Plan policies and existing progr ams would reduce impacts to less than significant . Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to other water-related risks and pollution . Implementation of the pro posed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(e) Conflict with Water Quality or Groundwater Management Plans. The General Plan EIR did not analyze impacts related to conflicts with water quality or groundwater management plans. However, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant. 4 – Evaluation of Environmental Impacts
72 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in conflicts with water quality or water management plans. Implementation of the proposed project would not result in a greater impact than was previously analyze d in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR noted that new development in the City and surrounding jurisdictions sharing the same watersheds (Guadalupe River, Calabazas Creek, and San Thomas Aquino Creek) may alter local drainage and runoff characteristics. It was also noted that storm water drainage systems are generally provided by local governments for areas within their jurisdictions, and are not provided on a regional basis. Therefore, the General Plan EIR determined that the City’s contribution to cumulative regional impacts associated with storm water drainage systems would be less than significant. In terms of water quality, the General Plan EIR found that increased cumulative urbanization would be expected to increase vehicle traffic and related releases of automobile -related pollutants, including petroleum hydrocarbons, metals, and sediment, drain from roads into surface waters and which could have a cumulative impact to local watersheds. As such, it was noted that development in Santa Clara and adjacent cities would be required to comply with applicable NPDES permits, as discuss ed in Section

4.4, Hydrology and Water Quality , which would require that projects implement Best Management Practices (BMPs) to treat storm water runoff, prior to its discharge, to the maximum extent practicable.

Therefore, the General Plan EIR determined that compliance with applicable NPDES permits, as the permits are amended over the course of the General Plan’s 25 year planning horizon, would reduce cumulative hydrology and water quality impacts to a less than significant level. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that cumulative hydrology and water quality impacts would be less than significant.

The Planning Area is completely urb anized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA. The proposed project would b e required to implement subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed project would not result in a greater hydrology and water quality impacts than was previously analyzed in the General Plan EI R and subsequent Specific Plan EIRs. Therefore, the cumulative hazards and hazardous materials impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to hydrology and water quality impacts.

However, future development projects would be subject to environmental review pursuant to CEQA 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 73
City of Santa Clara
upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. Subsequent Specific Plan EIR mitigation measures, as referenced above and listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan. With incorporation of subsequent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect related to hydrology and water quality. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

Lawrence Station SP EIR: HYD-1.

Tasman East SP EIR: HYD-1.1.

4 – Evaluation of Environmental Impacts
74 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

4.14 – Land Use and Planning
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR
and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Physically divide an
established community? Yes
Less than
Significant
Impact
No No No
b) Cause a significant
environmental impact due to
a conflict with any land use
plan, policy, or regulation
adopted for the purpose of
avoiding or mitigating an
environmental effect?
Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Divide an Established Community. The General Plan EIR found that changes in land use that would occur upon the implementation of General Plan would not result in the physical division of an established community. The General Plan EIR noted that the land use policies of the 2010 -2035 General Plan contain programs that encourage the preservation or enhancement of the existing, primarily residential community through infill development, open space opportunities, and development of compatible uses that will enhance the existing character of Santa Clara. The General Plan EIR also noted that the Land Use Element has specific policies for compatibility that would reduce the amount of conflict between differing land uses. Therefore, the General Plan EIR determined that this impact would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects that would physically divide an established community. All future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in the physical division of an established community. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 75
City of Santa Clara
(b) Conflict with Applicable Plans. The General Plan EIR found that new development and redevelopment under the 2010 -2035 General Plan has the potential to conflict with a responsible agency’s applicable land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. However, it was determined that implementation of General Plan policies and existing programs would minimize this effect. Therefore, the General Plan EIR determined that project impacts would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including su bsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not cause a significant environmental impact due to a conflict with a land use plan, p olicy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR did not analyze cumulative impacts related to land use and planning. However, the subsequent Specific Plan EIR for the Lawrence Station SP determined that cumulative land use and planning impacts would be less than significant.

The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than w as previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA. Implementation of the proposed project would not result in a greater land use and planning impacts than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative land use and planning impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan w ould have the effect of contributing incrementally to land use and planning impacts.

However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. The proposed project would not have a substantial adverse effect related to land use and planning. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions 4 – Evaluation of Environmental Impacts
76 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

There are no applicable General Plan EIR or subsequent Specific Plan EIR mitigation measures.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 77
City of Santa Clara

4.15 – Mineral Resources
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR
and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Result in the loss of
availability of a known
mineral resource that would
be of value to the region
and the residents of the
state?
Yes No Impact No No No
b) Result in the loss of
availability of a locally-
important mineral resource
recovery site delineated on
a local general plan, specific
plan or other land use plan?
Yes No Impact No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a-b) Known Mineral Resources/Loss of Mineral Resources. The General Plan EIR found that the City is located in an area zoned MRZ-1 for aggregate materials by the State of California. MRZ-1 zones are areas where adequate information indicates that no significant mineral deposits are present or where it is judged that little likelihood exists for their presence. The General Plan EIR found that there are no significant mineral resources present in the City boundaries. In addition, it was found that there are no exploitable oil or gas resources within the City, and new development and redevelopment under the 2010-2035 General Plan would not affect locally important mineral resources as there are none present in the City. Therefore, the General Plan EIR determined that there would be no impact. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that no impact to mineral resources would occur.

There are no known significant mineral resourc es in the City and there are no exploitable oil or gas resources within the City. Therefore, the proposed Zoning Code Update and General Plan Amendments would not result in the loss of availability of a known or locally important mineral resource.

Cumulative Impacts

The General Plan EIR did not analyze cumulative impacts related to the loss of known mineral resources or mineral resources recovery sites. However, the General Plan EIR found that the Planning Area is not known to support significant mineral resources of any type, and no mineral resources are currently being extracted in the City.
4 – Evaluation of Environmental Impacts
78 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
The proposed Zoning Code Update and General Plan Amendments do not include approval of any development projects. There are no known minerals or minerals recovery sites in the City. Therefore, the proposed project would not result in cumulative mineral resources impacts.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in the loss of known mineral resources or mineral resources recovery sites. The proposed project does not include approval of any development projects . Future development under the updated Zoning Code and amended General Plan would be sub ject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. No new significant impacts and no substantial increase in the severi ty of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR. As such, no subsequent environmental analysis and no new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

There are no applicable General Plan EIR or subsequent Specific Plan EIR mitigation measures.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 79
City of Santa Clara

4.16 – Noise

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Would the project result in
generation of a substantial
temporary or permanent
increase in ambient noise
levels in the vicinity of the
project in excess of standards
established in the local
general plan or noise
ordinance, or applicable
standards of other agencies?
Yes
Significant
and
Unavoidable
Impact
No No No
b) Would the project result in
generation of excessive
groundborne vibration or
groundborne noise levels?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
c) For a project located
within the vicinity of a private
airstrip or an airport land use
plan or, where such a plan
has not been adopted, within
two miles of a public airport or
public use airport, would the
project expose people residing
or working in the project area
to excessive noise levels?
Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Substantial Increase in Noise Levels.

Temporary/Construction Noise
The General Plan EIR found that new development and redevelopment under the 2010-2035 General Plan would cause a temporary or periodic increase in construction noise exposure above ambient levels. However, it was determined that implementation of Mitigation Measure 4.14 -3 would reduce potential construction noise impacts to less than significant . Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA also determined that construction -related impacts would be less than significant with incorporation of the following mitigation measures:

 Lawrence Station SP EIR – See Mitigation Measure NOI-3. 4 – Evaluation of Environmental Impacts
80 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
 Tasman East SP EIR – See Mitigation Measures NV-2.1 and NV-2.2.  Patrick Henry Drive SP EIR – See Mitigation Measure 13-1.  Freedom Circle FFA EIR – See Mitigation Measures 13-1 and 13-2.

Operational Noise
The General Plan EIR also found that new development and redevelopment under the 2010 -2035 General Plan would result in increased traffic noise, and the increases would be substantial for residential land uses along Tasman Drive between Lafayette Street and the easternmost city limits. As such, the Gener al Plan EIR incorporated Mitigation Measure 4.14 -2 to reduce traffic noise impacts .

Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that impacts would be less than significant with incorporation of the following mitigation measures:

 Lawrence Station SP EIR – See Mitigation Measures NOI-1 and NOI-2.  Patrick Henry Drive SP EIR – See Mitigation Measure 13-3.  Freedom Circle FFA EIR – See Mitigation Measures 13-5 and 13-6.

However, the subsequent Specific Plan EIR for the Patrick Henry Drive SP determined that increases in traffic noise levels from SP development would be significant and unavoidable and no feasible mitigation available to reduce this impact to less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, project impacts would be similar to and no greater than those evaluated in the General Plan EIR and subsequent EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in substantial temporary or permanent increases in ambient noise levels. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Nevertheless, similar to the General Plan EIR and subsequent Specific Plan EIRs, even with incorporation of the mitigation measures listed a bove, implementation of the proposed project would also result in the generation of a substantial permanent increase in ambient noise levels and result in a significant and unavoidable impact.

(b) Excessive Vibration. The General Plan EIR found that new development and redevelopment under the 2010-2035 General Plan could expose people to excessive ground vibration levels exceeding FTA guidelines. However, the General Plan EIR determined that implementation of Mitigation Measure 4.14- 1 along with General Plan policies would minimize vibration impacts . As such, the General Plan EIR included incorporation of Mitigation Measures 4.10 -1. Further, the General Plan EIR determined that the City would require individual development projects to undergo project-specific environmental review.

If project -level significant vibration impacts are identified, site-specific mitigation measures will be required under CEQA. Therefore, the General Plan EIR determined that vibration impacts would be less than significant with mitigation incorporated. Similarly, the Specific Plan EIRs for the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that impact vibration impacts would be less than significant with incorporation of the following mitigation measures:

 Tasman East SP EIR – See Mitigation Measures NV-1.1, NV-1.2, NV-1.3, NV-1.4, and NV-1.5.  Patrick Henry Drive SP EIR – See Mitigation Measure 13-2.  Freedom Circle FFA EIR – See Mitigation Measures 13-3 and 13-4. 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 81
City of Santa Clara

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to paleontological resources. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(c) Airport/Airstrip Noise. The General Plan EIR found that new development and redevelopment under the 2010-2035 General Plan would exceed Santa Clara County Airport Land Use Commission (ALUC) noise thresholds, which could expose individuals living and working within the plan area to excessive aircraft noise. However, it was found that compliance with the local airport land use plan and the City’s acceptable noise level standards as well as implementation of General Plan policies would effectively reduce potential program -level aircraft noise impacts . The City will require that individual development projects undergo project-specific environmental review. If significant project-level aircraft noise impacts are identified, specific mitigation measures will be required under CEQA. Therefore, the General Plan EIR determined there would be a less than significant impact. Similarly, the Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that airport-related noise impacts would either not occur or would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to excessive noise from airports. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implem entation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR noted that noise impacts are generally experienced locally as opposed to regionally. It was also noted that future increases in noise from buildout of the Mineta International Airport Master Plan, the BART to Silicon Valley extension project, and the High -Speed Rail project would all contribute to future noise conditions that would affect specific areas of Santa Clara. However, it was found that the future development allowed under the General Plan would not contribute to the railway or airport -related noise. It was further found that residents could be exposed to ongoing construction noise if multiple projects are clustered in an area and are constructed simultaneously or in sequence over a period of years, and increased traffic from build -out of the General Plan would contribute to a significant increase in traffic noise levels on roadway segments throughout the region, beyond accepted thresholds in various communities. Therefore, the General Plan EIR determined that 4 – Evaluation of Environmental Impacts
82 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
this impact, and the City’s contribution to it with build-out of the General Plan, would be significant and unavoidable. The EIR further found that there was no feasible mitigation available to reduce cumulative impacts to levels of insignificance.

The Planning Area is completely urbanized and cumulative impacts related to noise were analyzed in the General Plan EIR and were determined to be significant and unavoidable. The proposed Zoning Code Update and General Plan Amendments do not include approval of any development projects, and all future development projects under the updated Zoning Code and Amended General Plan would be required to perform environmental review pu rsuant to CEQA. Similar to what was determined in the General Plan EIR and subsequent Specific Plan EIRs, the proposed project would contribute to a significant permanent increase in ambient noise levels. All f uture development projects under t he proposed Zoning Code Update and General Plan Amendments would be required to implement General Plan EIR Mitigation Measures 4.1 4-1, 4.14 -2, and 4.14-3 as well as subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, implementation of the proposed project would also contribute to cumulative noise impacts, even with incorporat ion of mitigation, and would result in a significant and unavoidable cumulative impact.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the upd ated Zoning Code and amended General Plan would have the effect of contributing incrementally to noise impacts. However, all future development would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. General Plan EIR Mitigation Measures 4.14-1, 4.14-2, and 4.14-3, as described below, as well as the subsequent Specific Plan EIR mitigations measures described above, would also be applicable to the development associated with implementation of the proposed changes . The proposed Zoning Code Update and General Plan Amendments would not result in more severe noise impacts than were analyzed in the General Plan EIR and s ubsequent Specific Plan EIRs. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR. Likewise, there is no new information of substantial importance requiring new analysis or verification. As such, no subsequent environmental analysis and no new mitigation are required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

General Plan EIR: 4.14-1, 4.14-2 and 4.14-3.

Lawrence Station SP EIR: NOI-1, NOI-2, and NOI-3.

Tasman East SP EIR: NV-1.1, NV-1.2, NV-1.3, NV-1.4, NV-1.5, NV-2.1, and NV-2.2.

Patrick Henry Dr. SP EIR: 13-1, 13-2, and 13-3.

Freedom Circle FFA EIR: 13-1, 13-2, 13-3, 13-4, 13-5, and 13-6.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 83
City of Santa Clara

4.18 – Population and Housing
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Induce substantial
unplanned population
growth in an area, either
directly (for example, by
proposing new homes and
businesses) or indirectly
(for example, through
extension of roads or other
infrastructure)?
Yes
Significant
and
Unavoidable
Impact
No No No
b) Displace substantial
numbers of existing people
or housing, necessitating
the construction of
replacement housing
elsewhere?
Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Induce Population Growth. The General Plan EIR found that while over the long -term the 2010- 2035 General Plan accommodates the population growth forecast by ABAG Projections 2007, and accommodates in the near-term (2014) the RHNA goal set by ABAG, the General Plan is nonetheless ‘job-rich’. This means that it provides for more employment than housing and will lead to insufficient housing opportunities for all future Santa Clara workers. This is reflected in the jobs per employed resident ratio discussed above. Therefore, the General Plan EIR found that the 2010-2035 General Plan job growth (25,040 new jobs), would require substantial residential development elsewhere in the region to provide adequate housing opportunities for future workers. Based on planned job growth, roughly 3,500 housing units would need to be built elsewhere in the region to house Santa Clara workers who would have to reside outside of the City due to inadequate housing opportunities within the City.

The General Plan EIR determined this to be a significant impact due to the secondary effects related to increased VMT resulting from commuting due to a shortage of residential opportunities in closer proximity to Santa Clara employment areas. These secondary effects are discussed in detail in the Transportation, Air Quality, and Climate Change sections, respectively, of the General Plan EIR. Since implementation of the 2010 -2035 General Plan would induce substantial population growth at other locations, the General Plan EIR determined that the impact would be significant and unavoidable and no feasible mitigation measures are available.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General 4 – Evaluation of Environmental Impacts
84 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
Plan, including subsequent EIRs related to specific plans or area plans, project impacts would be similar to and no greater than those evaluated in the General Plan EIR and subsequent EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in any additional unplanned population growth .

Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would also induce substantial unplanned population growth and result in a significant and unavoidable impact.

(b) Displace Housing. The General Plan EIR found that the 2010-2035 General Plan would retain all existing housing units and could accommodate the population growth as forecast in ABAG’s Projections 2007. The General Plan EIR also found that the 2010-2035 General Plan would accommodate employment growth in ways (i.e., intensification of currently planned employment lands) that would not displace existing housing or people, nor would the construction of planned infrastructure or public facilities necessary to serve future growth require the displacement of existing housing units or people.

Therefore, the General Plan EIR determined that the 2010-2035 General Plan would have no impact in terms of housing or population displacement. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA, determined that this impact would either not occur or be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in the displacement of substantial numbers of existing people or housing . Implementation of the proposed project w ould not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in a less than significant impact.

Cumulative Impacts

The General Plan EIR noted that the cumulative scenario includes new population and employment growth planned by the cities of Santa Clara, San Jose, Cupertino, and Sunnyvale, and all cumulative population and employment growth would occur within the cities’ existing urban growth boundaries, with no expansion of urban services to rural undeveloped areas. While some new development would occur through development of the relatively few remaining vacant infil l parcels found in each city, the cumulative trend would continue to predominantly be redevelopment of existing low -intensity, underutilized parcels with new urban uses. In addition, it was found that most new housing accommodated within the cumulative jur isdictions would be in a medium - or high-density attached or mixed-use format. It was further found that new job growth would largely occur on previously developed parcels in intensified forms (i.e., more employees per acre compared to existing development patterns, often with structured parking). Given the interconnected nature of the cities and the regional transportation network, most workers would travel to jobs in a city different from where they live. In essence, the cumulative projects would accommodate two new jobs for every new employed resident, exacerbating Santa Clara County’s existing jobs -housing imbalance (1.2 in 2005 according to ABAG Projections 2007). The General Plan EIR found that the environmental consequences would primarily be increased regional traffic congestion and air pollution from vehicles as workers unable to live near 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 85
City of Santa Clara
their employment commute long distances from outlying areas with affordable housing, continuing a pervasive trend over the past several decades as job growth has o utpaced housing growth in Santa Clara County. Considering both ‘in process’ growth and new growth caused by the 2010-2035 General Plan, the City of Santa Clara would contribute to this cumulative imbalance in 2035 by adding 39,490 residents (yielding 23,694 employed residents) and 46,180 jobs, for a jobs per employed resident ratio of 1.95, (46,180 jobs divided by 23,694 employed residents). Therefore, the General Plan EIR determined that this is a cumulatively considerable contribution to a significant cum ulative impact that cannot be mitigated and is adverse and unavoidable.

The Planning Area is completely urbanized and cumulative impacts related to population and housing were analyzed in the General Plan EIR and were determined to be significant and unavoidable. The proposed Zoning Code Update and General Plan Amendments do not include approval of any development projects, and all future development projects under the upd ated Zoning Code and Amended General Plan would be required to perform environmental review pursuant to CEQA. Similar to what was determined in the General Plan EIR and subsequent Specific Plan EIRs, the proposed project would contribute to a significant impact related to unplanned population growth. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, implementation of the proposed project would also contribute to cumulative population growth, and would result in a significant and unavoidable cumulative impact.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to population growth impacts.

However, all future development would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. The proposed Zoning Code Update and General Plan Amendments would not result in more severe population and housing impacts than were analyzed in the General Plan EIR and subsequent Specific Plan EIRs. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR. Likewise, there is no new information of substantial importance requiring new analysis or verification. As such, no subsequent environm ental analysis and no new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

There are no applicable General Plan EIR or subsequent Specific Plan EIR mitigation measures.

4 – Evaluation of Environmental Impacts
86 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

4.15 – Public Services
Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environ mental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Fire protection? Yes
Less than
Significant
Impact
No No No
b) Police protection? Yes
Less than
Significant
Impact
No No No
c) Schools? Yes
Less than
Significant
Impact
No No No
d) Parks? Yes
Less than
Significant
Impact
No No No
e) Other public facilities? Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Fire protection. The General Plan EIR found that new growth under the 2010 -2035 General Plan would result in new population and residential and commercial development in Santa Clara, which would increase demand for fire and emergency medical protection services. However, it was found that existing facilities would have the capacity to absorb additional fire personnel without expanding the existing stations. Therefore, it was found that there would be no construction activities associated with the provision of new fire and life safety services and no associated construction -related effects.

Additional fire personnel would be housed in the existing facilities; however, there would be no need for expansion of the facilities. In addition, the General Plan EIR noted that the 2010 -2035 General Plan includes updated policies that address fire protection and public safety. Therefore, the General Plan EIR determined that there would be no construction activities associated with the provision of new fire and police services and no associated construction-related effects and project impacts on fire protection services would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 87
City of Santa Clara
Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed p roject would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to fire protection. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and s ubsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(b) Police protection. The General Plan EIR found that implementation of the 2010-2035 General Plan would increase the need for police services, and the additional officers would be housed in the existing facilities. The General Plan EIR found that refurbishment of the facilities would consist of reconfiguration of space and regular upgrade of furniture and equipment, but there would be no need for expansion of the facilities. Therefore, there would be no construction activities associated with the provision of new police services and no associated construction -related effects. The General Plan EIR also found that the 2010-2035 General Plan includes updated policies that address police protection and public safety.

Therefore, the General Plan EIR determined that impacts on police protection services would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any developme nt projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to police protection. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(c) Schools. The General Plan EIR found that the increase in population associated with new development and redevelopment allowed under the 2010 -2035 General Plan would increase the demand for school and community facilities services. The General Plan EIR further found that new development projected under the 2010-2035 General Plan would fall primarily within the jurisdiction of SCUSD, and approximately 12,500 households are expected to be added to the SCUSD area, which would result in approximately 2,000 additional students. The General Plan EIR found that SCUSD has four closed school sites that could be used to serve new development. Alternatively, it was noted SCUSD may choose to modify school catchment areas or add modular classrooms to accommodate new students. It w as also noted that SCUSD was also anticipating the construction of new school facilities in north San José as a result of an agreement with that city and future housing developers, and these new facilities in San José would add more capacity for new students and can reduce the number of students now in Santa Clara facilities. The General Plan EIR further noted that the Campbell Union 4 – Evaluation of Environmental Impacts
88 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
(K-8) and Campbell Union High (9-12) school districts, which overlap, would realize approximately 500 additional households a s a result of implementation of the 2010 -2035 General Plan, generating approximately 38 new K -8 and 42 new 9 -12 grade students. The Campbell K -8 and Campbell 9 -12 districts were anticipated to be able to accommodate the relatively modest gain in students f rom the City by modifying school catchment areas, busing and adding modular classrooms. The General Plan EIR found that the 2010-2035 General Plan includes updated policies that address schools and community facilities, and policies and existing regulation s and programs are designed to ensure that future development of new facilities within the City would not have an adverse physical effect on the existing environment. Therefore, the General Plan EIR determined that impacts to schools would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts relat ed to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to schools. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(d) Parks. Potential impacts to parks and recreation facilities are discussed in section 4.16, below. The General Plan EIR found that the increase in the population associated with new development and redevelopment allowed under the 2010 -2035 General Plan would increase the demand on existing parks, open space and recreation facilities. However, it was determined that the General Plan policies and existing regulations and programs were designed to ensure that increased demand associated with an increase in population would not signifi cantly accelerate the deterioration of existing facilities. As such, it was determined that the General Plan would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities and impacts to parks would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to parks. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(e) Other Public Facilities. The General Plan EIR noted that additional library facilities may be needed to meet the demand from the addition of approximately 33,000 new residents anticipated as a result of 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 89
City of Santa Clara
the 2010-2035 General Plan. Given that the large Central Park Library facility is located in the southern portion of the City, it is relatively close to, and could serve, anticipated new development along El Camino Real, Homestead Road, Kiely Boulevard and Stevens Creek Boulevard. However, it was found that new library facilities may be needed to serve the anticipated development in the northern portion of the City. The General Plan EIR found that new growth as a result of implementation of the 2010-2035 General Plan would increase the demand for arts, cu ltural and community facilities ; however, it was found that this future demand would not exceed the existing service capacity or generate the need for additional facilities particularly when the City can optimize the use of streets or other existing neighborhood amenities for community events. The General Plan EIR determined that General Plan policies and existing regulations and programs would ensure that future development of new facilities within the City would not have an adverse physical effect on the existing environment. Therefore, the General Plan EIR determined that impacts to other public facilities would be less than significant.

Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to other public facilities such as libraries. Implementation of the proposed project would not result in a greater impact than wa s previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR noted that public services are generally provided by local governments for areas within their jurisdictions and are not provided on a regional basis. It was also noted that law enforcement and fire protection and emergency services are provided by local governments or fire protection districts for areas within their jurisdiction, supplemented by mutual aid agreements between agencies to pool resources. Public schools are provided by school districts to residential areas within their jurisdictions.

While districts may cross city jurisdictional boundaries, school services are still provided at the local, rather than regional, level. As with the other public services, libraries are also generally provided by local governments for areas within their jurisdiction, and services are not provided on a regional basis.

Social services are generally provided by counties, and not on a regional basis. Neighborhood parks and recreational services are generally provided by local governments for areas within their jurisdiction.

The General Plan EIR determined that the 2010-2035 General Plan would not substantially impact the use of the other jurisdiction’s libraries, parks and recreation facilities in the region, although Santa Clara residents are also residents of Santa Clar a County and would continue to take advantage of County parks, trails, and other recreational facilities, funded in part by Santa Clara resident taxes. Therefore, the General Plan EIR determined that the cumulative regional impacts of the 2010-2035 General Plan associated with law enforcement, fire and emergency, schools, library, social, and neighborhood parks and recreation services would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP , the Patrick Henry Drive SP, and the Freedom Circle FFA determined that cumulative impacts would be less than significant.

4 – Evaluation of Environmental Impacts
90 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA. Implementation of the proposed project would not result in a greater public services impacts than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative public services impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to public services impacts. However, future development projects would be subject to e nvironmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. The proposed project would not have a substantial adverse effect related to p ublic services. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

There are no applicable General Plan EIR or subsequent Specific Plan EIR mitigation measures.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 91
City of Santa Clara

4.16 – Recreation

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR and
Subsequent
EIRs?
Proposed
Changes
Involving New
or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Would the project
increase the use of
existing neighborhood
and regional parks or
other recreational facilities
such that substantial
physical deterioration of
the facility would occur or
be accelerated?
Yes
Less than
Significant
Impact
No No No
b) Does the project
include recreational
facilities or require the
construction or expansion
of recreational facilities
which might have an
adverse physical effect on
the environment?
Yes
Less than
Significant
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Increased Park Use/ Substantial Physical Deterioration . The General Plan EIR found that the increase in the population associated with new development and redevelopment allowed under the 2010-2035 General Plan would increase the demand on existing parks, open space and recreation facilities. However, it was determined that the General Plan policies and existing regulations and programs were designed to ensure that increased demand associated with an increase in population would not significantly accelerate the deterioration of existing facilities. Therefore, the General Plan EIR determined that impacts to recreation facilities would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to deterioration of recreation facilities. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As 4 – Evaluation of Environmental Impacts
92 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(b) Include or Require Recreational Facilities. The General Plan EIR found that new development and redevelopment allowed under the 2010-2035 General Plan would require additional parkland and recreation facilities in the City. However, the General Plan EIR determined that the General Plan policies and existing regulations and programs were designed to ensure that future development of parkland within the City would not have an adverse physical effect on the existing environment . Therefore, the General Plan EI R determined that impacts to recreation facilities would be less than significant.

Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this imp act would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subs equent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development p rojects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to construction or expansion of recreation fac ilities. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR did not analyze cumulative recreation impacts. However, the subsequent Specific Plan EIRs for the Lawrence Station SP and the Tasman East SP determined that cumulative impacts would be less than significant.

The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed and would not approve any development projects. The proposed changes do not include approval of any development projects, and all future development pr ojects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA.

Implementation of the proposed project would not result in a greater recreation impacts than was previously analyzed in the Ge neral Plan EIR and subsequent Specific Plan EIRs. Therefore, the cumulative recreation impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to recreation impacts. However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. The proposed project would not have a substantial adverse effect related to recreation facilities. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewi se, there is no new 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 93
City of Santa Clara
information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

There are no applicable General Plan EIR or subsequent Specific Plan EIR mitigation measures.

4 – Evaluation of Environmental Impacts
94 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

4.17 – Transportation
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR and
Subsequent
EIRs?
Proposed
Changes
Involving New
or More
Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Conflict with a
program plan, ordinance
or policy addressing the
circulation system
including transit, roadway,
bicycle and pedestrian
facilities?
Yes
Significant
and
Unavoidable
No No No
b) Would the project
conflict or be inconsistent
with CEQA Guidelines
Section 15064.3,
subdivision (b)?
Yes Less than
Significant No No No
c) Substantially increase
hazards due to a
geometric design feature
(e.g., sharp curves or
dangerous intersections)
or incompatible uses (e.g.,
farm equipment)?
Yes
Less than
Significant
Impact
No No No
d) Result in inadequate
emergency access?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Circulation Plan Consistency. The General Plan EIR found that despite the 2010 -2035 General Plan’s overall land use -transportation efficiency, future development would nonetheless generate substantial additional traffic volumes that would cause congestion along certain roadway segments within the City’s jurisdiction, adjoining cities and freeway segments for which, in most cases, no feasible mitigation (i.e., ability to add new travel lanes) exists. Operating levels of city roadway segments would degrade below city Level of Service stan dards. Therefore, the General Plan EIR determined that the impact would be significant and unavoidable with respect to Level of Service/congestion.

The General Plan EIR also found that implementation of the 2010 - 2035 General Plan would result in the degrading of the operating levels of County Congestion Management Program (CMP) roadway 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 95
City of Santa Clara
segments beyond the then current County CMP Levels of Service standard . As such , this was determined to be a significant and unavoidable impact for which there is no feasible mitigation.

The General Plan EIR also found that the increased motor vehicle traffic and increased congestion from the 2010 - 2035 General Plan would result in increased transit travel times on transit corridors which was considered a significant impac t. The Findings of Fact also referenced General Plan Policy 5.8.3 - P3 as a means to address this potential impact:

“Support transit priority for designated Bus Rapid Transit, or similar transit service, through traffic signal priority, bus queue jump lanes, exclusive transit lanes and other appropriate techniques."

However, the General Plan EIR determined that there are no feasible mitigation measures to reduce this impact because the feasibility of transit-only lanes would be evaluated in more detailed studies and the effect of these policies is not fully known, including potential secondary impact. Therefore, the impact was considered significant and unavoidable.

The Tasman East Specific Plan also includes the following mitigation measures to address t raffic congestion, that, in some cases reduce localized impacts to some road, to less than significant, but overall, still resulted in significant and unavoidable impacts:

 Tasman East SP EIR – See Mitigation Measures TRANS-1.1:9, TRANS-1.2:10, TRANS-1.3:11, TRANS-1.4:37, TRANS-3.1:1, TRANS-3.2:9, TRANS-3.3:10, TRANS-3.4:37 and TRANS-4.1.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, project impacts would be similar to and no greater than those evaluated in the General Plan EIR and subsequent EIRs. The proposed changes do not incl ude approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in conflicts with a program plan, ordinance or policy addressing the circulation system. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and su bsequent Specific Plan EIRs, even with incorporation of the mitigation measures listed above, implementation of the proposed project would result in a significant unavoidable impact.

(b) CEQA Guidelines Section 15064.3(b). Although the CEQA Guidelines did not, as it now does, require the analysis of Vehicle Miles Travelled (VMT) when the General Plan EIR was certified, potential VMT impacts were evaluated in the EIR. The EIR noted that the total VMT generated under the 2010 - 2035 General Plan for the City of Santa Clara was estimated to be 3.74 million vehicle -miles per day (or a net increase of 552,227 vehicle miles compared to existing conditions). It was also found that the resulting average VMT per service population (residents and jobs) would be 12.2 vehicle miles per day under the 2010 -2035 General Plan, which represents a reduction of approximately 15.3 percent per service population compared to existing conditions at the time. The General Plan EIR further noted that this reflects that the general plan Focus Areas would include development of new complementary land uses that are in close proximity to each other, provide more opportunities for shorter trips that encourage walking and bicycling, and utilize higher densities of development that support enhanced transit service.

At a citywide performance level, the General Plan EIR found that the 2010 -2035 General Plan more efficiently links land uses and the transportation system network in that VMT and VT per service population are dropping compared to existing conditions, VMT growth is less than population growth, 4 – Evaluation of Environmental Impacts
96 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
non-auto travel mode shares increase, and trip length is virtually unchanged. The General Plan EIR found that all of these indicators suggest the 2010-2035 General Plan is an efficient, well-balanced plan from a land use -transportation standpoint compared to existing conditions. Similarly, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle FFA determined that VMT impacts would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the upd ated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant VMT impacts. Future development projects are subject to the City ’s VMT policy, which implements CEQA Guidelines Section 15064.

Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(c) Design Hazards. The General Plan EIR did not directly analyze potential impacts from design features hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses. Nevertheless, the General Plan EIR did not identify any existing or potential design hazards that could occur as the result of implementation of the General Plan. In addition, the General Plan EIR noted that potential roadway and circul ation design hazards more typically occur with site specific development proposal instead of plan/programs like a general plan. Finally, it was noted that when development proposal applications are submitted to the City they are review ed for potential design and circulation hazards and are subject to city regulations and standards related to project access and roadway design. In addition, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle FFA determined that impacts related to design hazards would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the subsequent Specific Plan EIRs. The proposed changes do not include approval of a ny development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to a design hazard.

Implementation of the proposed project would not result in a greater impact than was previously analyzed in the subsequent Specific Plan EIRs. As such, similar to the subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

(d) Emergency Access. The General Plan EIR did not specifically analyze impacts related to inadequate emergency access. However, the General Plan EIR found that increased motor vehicle traffic and increased congestion associated with implementation of the General Plan could res ult in increased emergency response times, and increased vehicle traffic associated with the 2010 -2035 General Plan could result in increased traffic congestion as described under Impacts 4.12 -1 through

4.12-5. This congestion, anticipated mainly during th e morning and evening commute periods, would result in decreased travel speeds and increased emergency vehicle response times on key routes in the City. To mitigate the impact of the 2010-2035 General Plan on emergency vehicle response times, the General Plan included a prerequisite policy 5.1.1-P5, which requires the City to evaluate appropriate 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 97
City of Santa Clara
measures to maintain emergency response time standards prior to the implementation of Phase III of the 2010-2035 General Plan. In addition, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP, and the Freedom Circle FFA determined that impacts related to emergency access would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to emergency access. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts.

Cumulative Impacts

The General Plan EIR determined that under cumulative conditions, which assumes build -out of all planned growth in the region, including the City’s Draft General Plan, regional roadways and highways would experience levels of service in excess of those identified by responsible agencies, for which no feasible mitigation exists. These cumulative impacts, and the City ’s contribution to them under the General Plan, were determined to be significant and unavoidable. Similarly, the subsequent Specific Plan EIR for the Lawrence Station SP determined that cumulative transportation impacts would be significant and unavoidable even with incorporation of the following mitigation measures:

 Lawrence Station SP EIR – See Mitigation Measures CUM-TR-1, CUM-TR-2, CUM-TR-4, and CUM-TR-5.
 Tasman East SP EIR – See Mitigation Measures C-TRANS-3.1, C-TRANS-3.2, and C-TRANS-

3.3. The Planning Area is completely urbanized and cumulative impacts related to air quality were analyzed in the General Plan EIR and were determined to be less than significant. Similar to what was determined in the General Plan EIR and subsequ ent Specific Plan EIRs, the proposed project would result in a significant and unavoidable cumulative transportation impact. The proposed Zoning Code Update and General Plan Amendments would be required to implement General Plan EIR Mitigation Measure 4.12- 1 as well as subsequent Specific Plan EIR mitigation measures incorporated by reference. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan w ould be required to perform environmental review pursuant to CEQA. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, implementation o f the proposed project would also contribute to cumulative transportation impacts, even with incorporation of mitigation, and would result in a significant and unavoidable cumulative impact.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to transportation impacts. However, all 4 – Evaluation of Environmental Impacts
98 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
future development would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. General Plan EIR Mitigation Measure 4.12-1, as well as the subsequent Specific Plan EIR mitigations measures listed below, would also be applicable to the development associated with implementation of the proposed changes. The proposed Zoning Code Update and General Plan Amendments would not result in more severe transportation impacts than were analyzed in the General Plan EIR and subsequent Specific Plan EIRs. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR. Likewise, there is no new information of substantial importance requiring new analysis or verification. As such, no subsequent environmental analysis and no new mitigation are required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

General Plan EIR: 4.12-1.

Lawrence Station SP EIR: CUM-TR-1, CUM-TR-2, CUM-TR-4, and CUM-TR-5.

Tasman East SP EIR: TRANS-1.1(9), TRANS-1.2(10), TRANS-1.3(11), TRANS-1.4(37), TRANS-3.1(1), TRANS-3.2(9), TRANS-3.3(10), TRANS-3.4(37), TRANS-4.1, C-TRANS-3.1, C-TRANS-3.2, and C-TRANS-3.3.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 99
City of Santa Clara

4.18 – Tribal Cultural Resources
Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a Cultural Native American tribe, and that is:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or
More Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Listed or eligible for
listing in the California
Register of Historical
resources, or in a local
register of historical
resources as defined in
Public Resources Code
Section 5020.1(k), or
Yes
Less than
Significant
with Mitigation
Incorporated
No No No
b) A resource determined
by the lead agency, in its
discretion and supported
by substantial evidence, to
be significant pursuant to
criteria set forth in
subdivision (c) of Public
Resources Code Section
5024.1. In applying the
criteria set forth in
subdivision (c) of Public
Resource Code Section
5024.1, the lead agency
shall consider the
significance of the
resource to a California
Native American tribe.

Yes
Less than
Significant
with Mitigation
Incorporated
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Listed or Eligible Historical Resources. The General Plan EIR did not specifically evaluate impacts to Tribal cultural resources because it was not required by CEQA until the passage of Assembly Bill 52 (AB 52) in 2014, which requires consultation between lead agencies and Tribal representatives for projects within Tribal territory. However, the General Plan EIR found that implementation of General Plan policies and programs, including application of the California Historic Building Code and the City’s Combining Historic Districts, the City’s design review process, and referral of projects involving historic resources to the Historical and Landmarks Commission, would serve to minimize historic resources impacts. The General Plan EIR further determined implementation of General Plan policies and existing 4 – Evaluation of Environmental Impacts
100 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
programs would reduce the impact to cultural resources to less than significant . Similarly, the subsequent Specific Plan EIR for the Tasman East SP determined that impacts to Tribal Cultural Resources would be less than significant. However, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle FFA determined that the following mitigation measures would be required to reduce impacts to less than significant:

 Patrick Henry Drive SP EIR – See Mitigation Measure 7-2.  Freedom Circle FFA EIR – See Mitigation Measures 7-3 and 7-4.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impact s related to implementation of the proposed project would be similar to the subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amend ed General Plan would be required to perform environmental review to ensure they do not result in significant impacts to listed or eligible historic resources. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the subsequent Specific Plan EIRs, impacts from the proposed project related to tribal cultural resources listed or eligible for listing in the California Register of H istorical resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k) would be less than significant.

(b) Significant Tribal Resources. The General Plan EIR did not specifically evaluate impacts to Tribal cultural resources because it was not required by CEQA until the passage of Assembly Bill 52 (AB 52) in 2014, which requires consultation between lead agencies and Tribal representatives for projects within Tribal territory. The General Plan EIR found that the potential for project -level impacts to unidentified and unrecorded tribal cultural places remains moderate to high. It was also found that future excavation and grading activities could result in impacts to human remains. However, the General Plan EIR found that 2010-2035 General Plan includes a range of policies to ensure the protection of cultural resources and thus, impacts to cultural resources were found to be less than significant. Therefore, the General Plan EIR determined impacts to cultural resources would be less than significant. Tthe subsequent Specific Plan EIR for the Tasman East SP determined that impacts to Tribal Cultural Resources would be less than significant. However, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle FFA determined that the following mitigation measures would be required to reduce impacts to less than significant:

 Patrick Henry Drive SP EIR – See Mitigation Measure 7-2.  Freedom Circle FFA EIR – See Mitigation Measures 7-3 and 7-4.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts to a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1 . Implementation of the proposed project would not result in a greater impact than was previously analyzed in the subsequent 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 101
City of Santa Clara
Specific Plan EIRs. In addition, all future discretionary proposals will be subject to the current requirements of AB 52 and SB 18. As such, similar to the subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

Cumulative Impacts

The General Plan EIR did not specifically evaluate cumulative impacts related to Tribal cultural resources because it was not required by CEQA until the passage of Assembly Bill 52 (AB 52) in 2014, which requires consultation between lead agencies and Tribal representatives for projects within Tribal territory. However, the General Plan EIR found that Projects in the City and other cumulative projects would implement mitigation that avoids or substantially lessens potentially significant impacts to cultural resources, as required by State law. These mitigation strategies would typically involve pre-construction identification surveys; significance evaluations; consultation with tribal descendant communities; culturally and legally appropriate treatment of human remains; archaeological construction monitoring; resource documentation; and data recovery for unavoidable impacts. These mitigation strategies would generally avoid or substantially lessen the severity of impacts to Tribal Cultural Resources. Therefore, the General Plan EIR determined that the City’s contribution to cumulative impacts associated with cultural resources is less than cumulatively considerable. Similarly, the subsequent Specific Plan EIR for the Tasman East SP determined that cumulative impacts to Tribal Cultural Resources would be less than significant.

The Planning Area is completely urbanized and most o f the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed and would not approve any development projects. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review pursuant to CEQA. The proposed project would be required to i mplement subsequent Specific Plan EIR mitigation measures incorporated by reference. Implementation of the proposed project would not result in a greater impact on cultural resources than was previously analyzed in the General Plan EIR and subsequent Speci fic Plan EIRs. Therefore, the cumulative tribal cultural resources impact from the proposed project would be less than significant.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to tribal cultural resources impacts.

However, future development projects would be subject to environmental review pu rsuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. Subsequent Specific Plan EIR mitigation measures, as referenced above and listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan. With incorporation of subsequent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect on any listed or eligible historical resources or significant tribal resources . No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed project would occur. Likewise, there is no new information o f substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required. 4 – Evaluation of Environmental Impacts
102 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

Patrick Henry Dr. SP EIR: 7-2.

Freedom Circle FFA EIR: 7-3 and 7-4.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 103
City of Santa Clara

4.19 – Utilities and Service Systems
Would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion
in General
Plan EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or
More Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing New
or More
Severe
Impacts?
a) Require or result in the
relocation or construction of
new or expanded water,
wastewater treatment or
storm water drainage,
electric power, natural gas,
or telecommunications
facilities, the construction or
relocation of which could
cause significant
environmental effects?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
b) Have sufficient water
supplies available to serve
the project and reasonably
foreseeable future
development during normal,
dry and multiple dry years?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No
c) Result in a determination
by the wastewater treatment
provider which serves or may
serve the project that it has
adequate capacity to serve
the project’s Projected
demand in addition to the
provider’s existing
commitments?
Yes
Less than
Significant
Impact
No No No
d) Generate solid waste in
excess of State or local
standards, or in excess of the
capacity of local
infrastructure, or otherwise
impair the attainment of solid
waste reduction goals?
Yes Significant
Unavoidable No No No
e) Comply with federal,
state, and local management
and reduction statutes and
regulations related to solid
waste?
Yes
Less than
Significant
with
Mitigation
Incorporated
No No No

4 – Evaluation of Environmental Impacts
104 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Utility Infrastructure. The General Plan EIR not specifically analyze impacts related to relocation or construction of storm water drainage, electric power, natural gas, or telecommunications facilities.

However, the General Plan EIR found that impacts related to water and wastewater treatment facilities would be less than significant. Similarly, the Specific Plan EIRs for the Lawrence Station SP and the Tasman East SP determined that this impact would be less than significant. However, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle FFA determined that impacts related to water supply infrastructure would be less than significant with incorporation of the following mitigation measures:

 Patrick Henry Drive SP EIR – See Mitigation Measure 18-1.  Freedom Circle FFA EIR – See Mitigation Measure 18-1 and 18-5.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not incl ude approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to new or exp anded utility infrastructure. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(b) Sufficient Water Supplies. The General Plan EIR noted that new development under the 2010 - 2035 General Plan would increase water demand within the City. However, it was also noted that the City’s Water Utility had determined that there would be sufficient water supplies to provide service to the City for the 2010-2035 General Plan under normal and single critical dry year scenarios. In the event of a multiple dry year event and the loss of supply from SFPUC, the General Plan EIR found that there is a projected shortfall of 0.6 percent or 193 afy in th e year 2035, and the City plans to meet future demand growth by pumping additional groundwater, relying on more recycled water, and increased conservation. Future pumping by the City of Santa Clara, in combination with the multiple other users of the Santa Clara Sub-Basin, would not be expected to contribute to cumulative groundwater pumping impacts, i.e., withdrawals above the basin's safe yield, given the Water District's reasonably foreseeable recharge and groundwater management programs. However, should the District's recharge program be affected by reduced availability of imported water, there is the potential for future cumulative groundwater basin demand to exceed the aquifer's safe yield. These impacts were considered potentially significant by the G eneral Plan EIR . Similarly, the subsequent Specific Plan EIRs for the Patrick Henry Drive SP and the Freedom Circle FFA determined that impacts related to water supply infrastructure would be less than significant with incorporation of the following mitigation measures:

 Patrick Henry Drive SP EIR – See Mitigation Measure 18-1.  Freedom Circle FFA EIR – See Mitigation Measure 18-1 and 18-5.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 105
City of Santa Clara
implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to en sure they do not result in significant impacts related to water supplies. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, similar t o the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(c) Wastewater Treatment Capacity. The General Plan EIR found that future projected wastewater flows would increase but remain within the City’s allocation of San Jose/Santa Clara Water Pollution Control Plant (WPCP) treatment capacity. It was also found that sanitary sewer conveyance capacity would need to be increased at select locations throughout the City to serve the increased wastewater flows from new development. The General Plan EIR noted that it is a city requirement that new industrial, commercial, and major residential development be reviewed to determine projected wastewater load and available sewer capacity before zoning approval or permits are approved and, to the extent that additional sewer collection system improvements may be identified as necessary to serve the development, such improvemen ts will become the responsibility of the project applicants.

Therefore, the General Plan EIR determined that impacts to wastewater services would be less than significant. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that this impact would be less than significant.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area plans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subseq uent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they d o not result in significant impacts related to wastewater treatment capacity. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. As such, simil ar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in less than significant impacts with incorporation of the mitigation measures listed above.

(d, e) Solid Waste Infrastructure/Regulations. The General Plan EIR noted that new development allowed under the General Plan would generate solid waste that can be accommodated under the existing landfill disposal contract through 2024. However, it was also noted that the City has no specific plan for disposing of solid waste beyond 2024, including waste generated by existing uses, but will undertake a process to identify a solution prior to 2024. Since no solution to this issue was identified when the EIR was certified this issue was considered significant. The City further determined that there were no feasible measures to reduce this impact and determined that the impact was significant and unavoidable. Both the EIR and the findings adopting the EIR indicated that an expansion of the Newby Island landfill was being evaluated and that the City also owns property outside its jurisdiction that could potentially provide this service. In addition, Prerequisite Policy 5.1.1 -P22 requires the re-evaluation of landfill capacity. This assessment could also exa mine the City's progress on attaining recycling goals in order to evaluate whether there is a continuing long -term need for solid waste capacity. Therefore, the General Plan EIR determined that this impact would be significant and unavoidable. Similarly, the subsequent Specific Plan EIR for the Lawrence Station SP determined that impacts would be significant and unavoidable even with incorporation of the following mitigation measure:
4 – Evaluation of Environmental Impacts
106 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

 Lawrence Station SP EIR – See Mitigation Measure UTIL-1.

Since the proposed Zoning Code Update and General Plan Amendments do not include any changes to general plan land use designations or policies that would increase the growth capacity of the General Plan, including subsequent EIRs related to specific plans or area pl ans, the impacts related to implementation of the proposed project would be similar to the General Plan EIR and subsequent Specific Plan EIRs. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended General Plan would be required to perform environmental review to ensure they do not result in significant impacts related to solid waste infrastructure and regulations. Implementation of the proposed project would not result in a greater impact than was previously analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Nevertheless, similar to the General Plan EIR and subsequent Specific Plan EIRs, implementation of the proposed project would result in les s significant and unavoidable impacts, even with incorporation of the mitigation measures listed above.

Cumulative Impacts

The General Plan EIR determined that p otential impacts to water supply were determined to be less than significant with mitigation and potential impacts to solid waste capacity were determined to be significant, adverse and unavoidable. Similarly, the subsequent Specific Plan EIRs for the Lawrence Station SP and the Tasman East SP determined that cumulative solid waste impacts would b e significant and unavoidable and no feasible mitigation is available.

The Planning Area is completely urbanized and most of the Planning Area is designated in the City’s General Plan and Zoning Code for urban development. The proposed Zoning Code Update and General Plan Amendments would not result in greater growth capacity than was previously analyzed. The proposed changes do not include approval of any development projects, and all future development projects under the updated Zoning Code and amended Ge neral Plan would be required to perform environmental review pursuant to CEQA. The proposed project would be required to implement General Plan EIR and subsequent Specific Plan EIR mitigation measures incorporated by reference.

Implementation of the proposed project would not result in a greater utilities and services systems impacts than was previously analyzed in the General Plan EIR and subsequent Spec ific Plan EIRs.

Nevertheless, consistent with the General Plan EIR and subsequent Specific Plan EIRs, the cumulative utilities and service systems impact from the proposed project would be significant and unavoidable.

Conclusion

The proposed Zoning Code Update and General Plan Amendments would not result in increased development density or capacity. Future development under the updated Zoning Code and amended General Plan would have the effect of contributing incrementally to utilities and service system impacts.

However, future development projects would be subject to environmental review pursuant to CEQA upon application for entitlement permits. Projects found to be not exempt from CEQA would be subject to analysis and mitigation, if required. General Plan EIR and subsequent Specific Plan EIR mitigation measures, as referenced above and listed below, would also be applicable to development that would occur under the updated Zoning Code and amended General Plan. With incorporation of subsequent Specific Plan EIR mitigation measures, the proposed project would not have a substantial adverse effect related to utilities and service systems. No new significant impacts and no substantial increase in the severity of previously identified impacts associated with t he proposed project would occur. Likewise, there is no new information of substantial importance requiring new analysis or verification. The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major 4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 107
City of Santa Clara
revisions to t he General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

General Plan EIR: 4.7-1

Lawrence Station SP EIR: UTIL-1.

Patrick Henry Dr. SP EIR: 18-1.

Freedom Circle FFA EIR: 18-1 and 18-5.

4 – Evaluation of Environmental Impacts
108 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

4.20 – Wildfire
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or
More Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Substantially impair an
adopted emergency
response plan or
emergency evacuation
plan?
Yes No Impact No No No
b) Due to slope,
prevailing winds, and other
factors, exacerbate wildfire
risks, and thereby expose
project occupants to,
pollutant concentrations
from a wildfire or the
uncontrolled spread of
wildfire?
Yes No Impact No No No
c) Require the installation
or maintenance of
associated infrastructure
(such as roads, fuel
breaks, emergency water
sources, power lines or
other utilities), that may
exacerbate fire risk or that
may result in temporary or
ongoing impacts to the
environment?
Yes No Impact No No No
d) Expose people or
structures to significant
risks, including downslope
or downstream flooding or
landslides, as a result of
runoff, post-fire slope
instability, or drainage
changes?
Yes No Impact No No No

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 109
City of Santa Clara
Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

Please note that none of the impacts in this section were evaluated in the General Plan EIR because this impact area was added to the Appendix G of the CEQA Guidelines in 2019 and thus post -dates the EIR. In addition, the Wildfire section of Appendix G ap plies only to areas within or near State responsibility areas or lands classified as Very High Fire Hazard Severity Zones and these conditions do not apply to the City of Santa Clara. The General Plan EIR also indicates that there are no wildfire hazards in the City of Santa Clara (See Page 409).

(a) Impairment of Emergency Plans. The General Plan EIR did not examine this potential impact.

However, Section 4.13, Hazards, of the General Plan EIR found that there are no wildfire hazards in the City of Santa Clara. In addition, the subsequent specific plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that that no wildfire impacts would occur.

The City of Santa Clara is almost completely urbanized and there are very few undeveloped parcels in the Planning Area. There are no lands within the City designated as Very High Fire Hazard Severity Zones. The proposed project will not result in any changes to general plan land use designations or Circulation Element improvements that could increase potential impacts beyond those analyzed in the General Plan EIR. Therefore, the proposed project would not subs tantially impair an adopted emergency response plan or emergency evacuation plan and impacts would be less than significant.

(b) Pollutant Concentrations from Wildfire. The General Plan EIR did not examine this potential impact. However, Section 4.13, Haz ards, of the General Plan EIR found that there are no wildfire hazards in the City of Santa Clara . In addition, the subsequent specific plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that that no wildfire impacts would occur.

The City of Santa Clara is almost completely urbanized and there are very few undeveloped parcels in the Planning Area. The City is predominantly flat with no areas with steep slopes or wildland interface areas. There are no lands within the City designated as Very High Fire Hazard Severity Zones .

Therefore, the proposed project would not expose persons to pollutant concentrations from a wildfire or the uncontrolled spread of wildfire and impacts would be less than significant.

(c) Installation or Maintenance of Associated Infrastructure. The General Plan EIR did not examine this potential impact. However, Section 4.13, Hazards, of the General Plan EIR found that there are no wildfire hazards in the City of Santa Clara and the City is not within or near a Very High Fire Hazard Severity Zone. In addition, the subsequent specific plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that that no wildfire impacts would occur.

The City has been largely built out and the necessary infrastructure is in place to support future development under the updated Zoning Code and amended General Plan . Future project roadways would connect to the existing roadway system in the area and utility connections would be made for sewer and electric services. No wildlands exist in the vicinity of the project site, and there are no areas of the City designated as Very High Fire Hazard Severity Zones . The project would not require the installation or maintenance of associated infrastructure that may exacerbate fire risk or that may result in tempor ary or ongoing impacts to the environment. Therefore, impacts related to installation or maintenance of associated infrastructure would not occur.

4 – Evaluation of Environmental Impacts
110 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
(d) Post-Fire Slope Instability or Drainage Changes. The General Plan EIR did not examine this potential impact. However, Section 4.13, Hazards, of the General Plan EIR found that there are no wildfire hazards in the City of Santa Clara . In addition, the subsequent specific plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that that no wildfire impacts would occur.

The City is not located within or near a Very High Fire Hazard Severity Zone and is relatively flat.

Because no wildlands exist in the vicinity of the City, the project would not expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post- fire slope instability, or drainage changes. Development of the proposed project would comply with the California Uniform Building Code for grading and drainage. Therefore, impacts related to post-fire slope instability or drainage changes would be less than significant.

Cumulative Impacts

The General Plan EIR did not examine potential cumulative wildfire impacts. However, Section 4.13, Hazards, of the General Plan EIR found that there are no wildfire hazards in the City of Santa Clara and the City is not within or near a Very High Fire Hazard Zone. In addition, the subsequent specific plan EIRs for the Lawrence Station SP, the Tasman East SP, the Patrick Henry Drive SP, and the Freedom Circle FFA determined that that no wildfire impacts would occur.

The City of Santa Clara is almost completely urbanized and there are no lands designated as being in or within a Very High Fire Hazard Severity Zone. Implementation of the proposed Zoning Code Update and General Plan Amendments would not result in w ildfire impacts. Therefore, no cumulative wildfire impacts would occur as a result of the proposed project.

Conclusion

No new significant impacts and no substantial increase in the severity of previously identified impacts associated with the proposed Zoning Code Update and General Plan Amendments would occur.

Likewise, there is no new information of substantial importance requiring new analysis or verification.

The Zoning Code Update and General Plan Amendments do not propose substantial changes that require major revisions to the General Plan EIR or subsequent Specific Plan EIRs. As such, no further analysis or new mitigation is required.

Applicable General Plan EIR / Subsequent Specific Plan EIR Mitigation Measures

There are no applicable General Plan EIR or subsequent Specific Plan EIR mitigation measures.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 111
City of Santa Clara

4.21 – Mandatory Findings of Significance

Effect
Examined
in General
Plan EIR
and
Subsequent
EIRs?

Conclusion in
General Plan
EIR and
Subsequent
EIRs?
Proposed
Changes
Involving
New or
More Severe
Impacts?

New
Circumstances
Involving New
or More Severe
Impacts?
New
Information
Showing
New or More
Severe
Impacts?
a) Does the project have
the potential to degrade
the quality of the
environment, substantially
reduce the habitat of a fish
or wildlife species, cause a
fish or wildlife population to
drop below self-sustaining
levels, threaten to
eliminate a plant or animal
community, reduce the
number or restrict the
range of a rare or
endangered plant or
animal or eliminate
important examples of the
major periods of California
history or prehistory?
Yes
Significant
and
Unavoidable
Impact
No No No
b) Does the project have
impacts that are
individually limited, but
cumulatively considerable?
Yes
Significant
and
Unavoidable
Impact
No No No
c) Does the project have
environmental effects
which will cause
substantial adverse effects
on human beings, either
directly or indirectly?
Yes
Significant
and
Unavoidable
Impact
No No No

Proposed Project in Relation to the General Plan EIR and Subsequent Amendments

(a) Significant Biological or Cultural Impacts. The results of the preceding analysis indicate that the proposed Zoning Code Update and General Plan Amendments will have less than significant impacts to sensitive biological, archaeological, and paleontological resources with incorporation of mitigation measures. However, the results of the preceding analysis indicate that, similar to the General Plan EIR and subsequent Specific Plan EIRs, the proposed project would have a significant and unavoidable impact on historical resources even after incorporation of mitigation measures. Impacts to scenic vistas, scenic resources, and visual character will be less than significant with incorporation of mitigation measures. The project would not authorize any development plan, would not authorize redevelopment of any existing sites, would not authorize construction of new infrastructure, would not change existing city land use policy regarding locations or intensities of development, and would not result in any effects 4 – Evaluation of Environmental Impacts
112 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
that would degrade the quality of the environment beyond such impacts already analyzed in the General Plan EIR and subsequent Specific Plan EIR’s. Therefore, the City finds that impacts related to degradation of the environment significant and unavoidable even with incorporation of mitigation measures.

(b) Cumulative Impacts. Cumulative effects resulting from full implementation of city land use policies were evaluated in the General Plan EIR and subsequent Specific Plan EIRs. The proposed Zoning Code Update and General Plan Amendments would not change any of these policies and do not propose any specific development or redevelopment project that could contribute to short-term or long- term cumulative impacts that were not addressed sufficiently in the General Plan EIR and subsequent Specific Plan EIR’s. The proposed Zoning Code Update and General Plan Amendments do not include any changes to land use designations and thus is consistent with what was analyzed in the General Plan EIR and subsequent Specific Plan EIRs. The project would not result in more significant cumulative impacts than were analyzed in the General Plan EIR and subsequent Specific Plan EIRs. Therefore, the City hereby finds that the proposed project’s individual contribution to potentially significant cumulative impacts is not considerable and no additional mitigation is required.

(c) Substantial Adverse Effects on Human Beings. As supported by the preceding environmental evaluation, the proposed Zoning Code Update and General Plan Amendments would not result in substantial adverse effects on human beings above and beyond these effects analyzed in the General Plan EIR and subsequent Specific Plan EIRs . It has been determined through analysis supported by substantial evidence that the proposed project could have adverse impacts on people and/or the environment as evaluated in the 20 preceding environmental topics. Therefore, the City hereby finds that direct and indirect impacts on human beings will be significant and unavoidable even with incorporation of mitigation measures.

4 – Evaluation of Environmental Impacts
Zoning Code Update and General Plan Amendments 113
City of Santa Clara

This Page Intentionally Left Blank.

Zoning Code Update and General Plan Amendments 114
City of Santa Clara
5 Applicable GP / Subsequent SP EIR Mitigation Measures

The following General Plan EIR mitigation measures are applicable to the proposed project:

AIR QUALITY

MM 4.10-1: Policy 5.1.1-P25 should be added to the Prerequisite section as follows:

Policy 5.1.1-P25: Prior to the implementation of Phase III, the City will include a Community Risk Reduction Plan (CRRP) for acceptable TAC concentrations consistent with the BAAQMD CEQA Guidelines, including risk and exposure reduction targets, measures to reduce emissions, monitoring procedures, and a public participation process.

Policy 5.10.5-P34 should be added to the Safety section as follows:

Policy 5.10.5 -P34: Include minimu m setbacks of 500 feet for roadways with average daily trips of 100,000 or more and 100 feet for railroad tracks for new residential or other uses with sensitive receptors, unless a project-specific study identifies measures such as, site design, tiered landscaping, air filtration systems, windows design to reduce exposure, demonstrating that the potential risks can be reduced to acceptable levels.

MM 4.10-2: Policy 5.10.5-P35 should be added to the Safety section as follows:

Policy 5.10.5-P35: Establish minimum buffers between odor sources and new residential or other uses with sensitive receptors, consistent with the BAAQMD guidelines, unless a project-specific study demonstrates that these risks can be reduced to acceptable levels.

BIOLOGICAL RESOURCES

MM 4.9-1: Congdon’s Tarplant Program Mitigation: On parcels with ruderal grasslands, surveys will be conducted prior to future development to document the presence/absence of Congdon’s tarplant. In the event the species is present, the project design w ill incorporate an adequate buffer, as determined by a qualified biologist, to ensure the Congdon’s tarplant is not threatened by development.

MM 4.9-2: Burrowing Owl Program Mitigation: Future development on parcels with ruderal grasslands will include t he following standard measures to reduce potential WBO impacts to a less than significant level:

1. Determine Burrowing Owl Presence

a. Breeding Season Surveys

Standardized surveys are necessary to determine presence (or presumed absence) of burrowing owls for the purposes of inventory, monitoring, avoidance of take, and determining appropriate mitigation. In California the breeding season begins as early as February 1 and continues through August 31. The California Burrowing Owl Consortium 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 115
City of Santa Clara
(Consortium) survey protocol specifies a multi-phase approach, which is recommended in order to adequately evaluate burrowing owl use of an area and to inform the CEQA process. The Department recommends that the Consortium survey protocol for breeding season surveys be adh ered to (4 survey visits spread evenly (roughly every 3 weeks) during the peak of the breeding season, from April 15-July 15) The habitat assessment, intensive burrow surveys and burrowing owl surveys should include the area within 150 meters of the project boundaries (approximately 500 feet).

b. Non-Breeding Season Surveys (Including Winter)

Surveys during the non-breeding season (September 1- January 31) are recommended by the Department but are not generally required because burrowing owls are much more difficult to detect during the non -breeding season, and the number or type of surveys that would be needed to detect presence then has not been studied or quantified. Negative results during any nonbreeding season surveys are not conclusive proof that owls do not use the site. Because of this complication, the DFG recommends breeding season surveys as the first step, but project applicants should consult with the Department if burrowing owls have been documented on the project site during the non- breeding season.

2. Avoid Impacts (destruction, disturbance) to Individual Owls

a. Pre-Construction Surveys for Owl Presence

Pre-construction surveys (usually initiated during the non -breeding season) are necessary for assessing owl presence at a site within a short ti me period before site modification is scheduled to begin. Pre -construction surveys are supplemental to the existing breeding season survey protocol (4 survey visits spread evenly during the peak of the breeding season, from April 15 - July 15). Initial pre -construction surveys should be conducted no more than 30 days prior to ground -disturbing activities (for example, disking, clearing, grubbing, grading). Generally, at a minimum, 4 survey visits on at least 4 separate days will be necessary, The time lapse between surveys and site disturbance should be as short as possible and will be determined by DFG based on specific project conditions but generally should not exceed 7 days. Additional surveys are necessary when the initial disturbance is followed by peri ods of inactivity or the development is phased spatially and/or temporally over the project area. Biologists conducting pre - construction surveys should expend enough effort, based on the above criteria, to assure with a high degree of certainty that take of owls will not occur once site modification and grading activities begin. The report should be submitted to the DFG for review.

b. Buffer Zones Around Occupied Burrows (Year-Round)

Buffer zones to protect burrowing owls from direct disturbance should be im plemented pursuant to the Consortium Guidelines and the Department’s Staff Report (1995).

Generally, the buffers recommended in these reports for protecting burrowing owls from disturbance is 75 meters (250 feet) from occupied burrows during the breeding s eason and 50 meters (160 feet) from occupied burrows during the non -breeding season.

Consultation with the Department may result in site -specific buffer specifications, on a case-by-case basis.

5 – Applicable Mitigation Measures
116 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
c. Passive Relocation

If construction will directly impact occ upied burrows, eviction of owls should occur outside the nesting season to prevent injury or mortality of individual owls. No burrowing owls will be evicted from burrows during the nesting season (1 February through 31 August) unless evidence indicates tha t nesting is not actively occurring (e.g., because the owls have not yet begun nesting early in the season, or because young have already fledged late in the season). Relocation of owls during the non -breeding season will be performed by a qualified biologist using one-way doors, which should be installed in all burrows within the impact area and left in place for at least two nights. These one -way doors will then be removed and the burrows backfilled immediately prior to the initiation of grading. Furthermore, should the Valley HCP, once adopted, include a regional WBO mitigation program that would be available to future projects in Santa Clara, future projects may have a feasible option to mitigate for their individual impacts to loss of WBO foraging and/or nesting habitat by participating in the Valley HCP’s program.

NOISE

MM 4.14-1: Use the Federal Transit Administration vibration impact criteria, as described above under the Regulatory Setting, to evaluate the land use compatibility of sensitive uses proposed along the railroad/light-rail corridor using the best available information (e.g., High Speed Rail Program EIR) or site -specific measurements and analyses (assuming active railroad operations). Developers of sensitive uses shall demonstrate that potential impacts of existing or potential vibration have been minimized to the maximum feasible extent.

MM 4.14-2: Case studies have shown that the replacement of dense grade asphalt (standard type) with open -grade or rubberized asphalt can reduce traffi c noise levels along local roadways by 2 to 3 dBA CNEL. A possible noise reduction of 2 dBA would be expected using conservative engineering assumptions, and future traffic noise increases could be mitigated to a less than significant level by repaving roadways with “quieter pavements.” To be a permanent mitigation, subsequent repaving would also have to use “quieter” pavements. Existing residential receivers located along Tasman Drive between Lafayette Street and the easternmost city limits either front the roadway (private outdoor use areas are located behind the homes) or have outdoor use areas adjacent to the roadway that may or may not be shielded by fences or noise barriers. In situations where private outdoor use areas are located adjacent to the road way, new or larger noise barriers could be constructed to provide the additional necessary noise attenuation in private use areas. Typically, increasing the height of an existing barrier results in approximately one dBA of attenuation per one foot of addit ional barrier height. The design of such noise barriers would require additional analysis. Traffic calming could also be implemented to reduce noise levels expected with the project. Each five mph reduction in average speed provides approximately one dBA o f noise reduction on an average basis (Leq/CNEL). Traffic calming measures that regulate speed improve the noise environment by smoothing out noise levels. Residences could also be provided with sound insulation treatments if further study finds that interior noise levels within the affected residential units would exceed 45 dBA CNEL as a result of the projected increase in traffic noise. Treatments to the homes may include the replacement of existing windows and doors with sound-rated windows and doors and the provision of a suitable form of forced -air mechanical ventilation to allow the occupants the option of 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 117
City of Santa Clara
controlling noise by closing the windows. The specific treatments for each affected residential unit would be identified on a case-by-case basis.

MM 4.14-3: Develop construction noise control plans that consider the following available controls in order to reduce construction noise levels as low as practical: Utilize ‘quiet’ models of air compressors and other stationary noise sources where technol ogy exists; Equip all internal combustion engine -driven equipment with mufflers, which are in good condition and appropriate for the equipment; Locate all stationary noise- generating equipment, such as air compressors and portable power generators, as far away as possible from adjacent land uses; Locate staging areas and construction material areas as far away as possible from adjacent land uses; Prohibit all unnecessary idling of internal combustion engines; Notify all adjacent land uses of the constructio n schedule in writing; Designate a "disturbance coordinator" who would be responsible for responding to any local complaints about construction noise. The disturbance coordinator will determine the cause of the noise complaint (e.g., starting too early, bad muffler, etc.) and will require that reasonable measures warranted to correct the problem be implemented. Conspicuously post a telephone number for the disturbance coordinator at the construction site and include it in the notice sent to neighbors regarding the construction schedule.

TRANSPORTATION

MM 4.12-1: Adopt Prerequisite Policy 5.1.1-P5. Prior to the implementation of Phase II and III of the 2010 -2035 General Plan, evaluate appropriate measures to maintain emergency response time standards.

UTILITIES AND SERVICE SYSTEMS

MM 4.7-1: To prevent a cumulatively considerable contribution to a potential future overdraft of the Santa Clara Sub-Basin, the City shall update the forecast groundwater pumping supply quantities every five years with each UWM P to align water supply availability with the water demand associated with each General Plan Phase. Future Santa Clara UWMPs will be coordinated with the Water District and implement alternative sources (i.e., recycled water and increased conservation) if cumulative groundwater pumping, based on all water retailers UWMPs, would exceed the Santa Clara Sub-Basin safe yield. With implementation of this program mitigation measure, potential future impacts associated with supplying future development envisioned by the General Plan would be reduced to a less than significant level.

The following subsequent Lawrence Station Specific Plan EIR mitigation measures are incorporated by reference and are applicable to the proposed project:

AIR QUALITY

MM AQ-1: Implement BAAQMD-recommended Measures to Control Particulate Matter Emissions during Construction for all projects allowed by the LSAP, including future development.

Measures to reduce diesel particulate matter and PM from construction are recommended to ensure that short-term health impacts to nearby sensitive receptors are avoided.

5 – Applicable Mitigation Measures
118 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
 All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day.  All haul trucks transporting soil, sand, or other loose material offsite shall be covered.  All visible mud or dirt track -out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.
 All vehicle speeds on unpaved roads shall be limited to 15 miles per hour (mph).  All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.
 Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points.  All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.  Post a publicly visible sign(s) with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations.
 Clear signage at all construction sites will be posted indicating that diesel equipment standing idle for more than five minutes shall be turned off. This would include trucks waiting to deliver or receive soil, aggregate, or other bulk materials. Rotating drum concrete trucks could keep their engines running continuously as long as they were onsite or adjacent to the construction site.
 The contractor shall install temporary electrical service whenever possible to avoid the need for independently powered equipment (e.g. compressors).  Properly tune and maintain equipment for low emissions.

MM AQ-2: Implement the following additional control measures for the SummerHill Homes site and the future development area to further reduce NOx and PM associated with Impact AQ- 1:

 All diesel-powered off-road equipment larger than 50 horsepower and operating on the SummerHill Homes site and the future development area for more than two days continuously shall, at a minimum, meet U.S. EPA particulate matter emissions standards for Tier 4 engines or equivalent and the latest CARB equipment standards at a minimum. Note that the construction contractor could use other measures to minimize construction period DPM emissions to reduce the predicted cancer risk below the thresholds. Such measures may be the use of alternative powered equipment (e.g., LPG-powered lifts), alternative fuels (e.g., biofuels), added exhaust emission control devices, or a combination of measures, provided that these measures are approved by the City and demonstrated to reduce construc tion risk impacts to less than significant.

MM AQ-3: Development projects at the study area shall include the following measures to minimize long-term TAC and annual PM2.5 exposure for new project occupants:

5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 119
City of Santa Clara
 Design the site to limit exposure from sources of TACs and PM2.5 emissions. The final layout shall locate operable windows and air intakes as far as possible from Central Expressway and Lawrence Expressway. Any modifications to the site design shall incorporate buffers between residences and the roadway.  To the greatest degree possible, plant vegetation along the study area boundaries near Central Expressway and Lawrence Expressway and around outdoor use areas.

This barrier would include trees and shrubs that provide a dense vegetative barrier.  Install air filtration at units that have predicted PM2.5 concentrations above 0.3 micrograms per cubic meter (μg/m3). Air filtration devices shall be rated MERV13 or higher. To ensure adequate health protection to sensitive receptors, a ventilation system shall meet the following minimal design standards:
o A MERV13 or higher rating (or MERV16 where specified below); o At least one air exchange(s) per hour of fresh outside filtered air; o At least four air exchange(s) per hour recirculation; and o Alternately, at the approval of the City, equivalent control technology may be used if it is shown by a qualified air-quality consultant or heating, ventilation, and air conditioning (HVAC) engineer that it would reduce risk below significance thresholds.
 As part of implementing this measure, an ongoing maintenance plan for the building’s HVAC air filtration system shall be required. Recognizing that emissions from air pollution sources are decreasing, the maintenance period shall last as long as significant excess cancer risk or annual PM2.5 exposures are predicted. Subsequent studies could be conducted by an air quality expert approved by the City to identify the ongoing need for the filtered ventilation systems as future information becomes available.
 Ensure that the lease agreement and other property documents (1) require cleaning, maintenance, and monitoring of the affected units for air flow leaks; (2) include assurance that new owners and tenants are provided information on the ventilation system; and (3) include prov isions that fees associated with owning or leasing a unit(s) in the building include funds for cleaning, maintenance, monitoring, and replacements of the filters, as needed.
 Require that, prior to building occupancy, an authorized air pollutant consultant or HVAC engineer verify the installation of all necessary measures to reduce toxic air contaminant (TAC) exposure.
 The type of MERV -rated filtration required to be installed as part of the ventilation system in the residential buildings shall be as follows:
o MERV13 filtration shall be utilized for areas where the annual PM2.5 concentrations are 0.4 μg/m3 or greater for unmitigated concentrations. o MERV16 filtration shall be utilized for areas where the annual PM2.5 concentrations are 0.8 μg/m3 or greater for unmitigated concentrations.

MM AQ-4: Implement additional control measures to reduce NOx. All diesel -powered off -road equipment larger than 50 horsepower and operating on site for more than two days shall, at a minimum meet U.S. EPA NOx emissions standards for Tier 4 engines or equivalent and the latest CARB equipment standards at a minimum.

MM AQ-5: Require the use of low volatile organic compound (VOC) paint for construction of SummerHill Homes. The SummerHill Homes construction contractor shall require the use of low VOC paint based on the following specifications: 50 g/L VOC for all interior coatings and 50 g/L VOC for all exterior coatings.
5 – Applicable Mitigation Measures
120 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

MM AQ-6: Require a project -level construction assessment of the future development area.

Construction criteria pollutant quantification will be required on a project-level basis once those details are available through modeling to identify impacts and, if necessary, include measures to reduce emissions. Reduction in emissions can be accomplished by the following measures:

 Construction equipment selection;
 Use of alternative fuels, engine retrofits, and added exhaust devices;  Low-VOC paints;
 Modify construction schedule; and
 Implementation of BAAQMD Basic and/or Additio nal Construction Mitigation Measures for control of fugitive dust.

MM AQ-7: Require the Use of Low VOC Paint for Operational Architectural Coatings of the Phase 1 buildings. Santa Clara shall require the use of low VOC paint for all operational architectural coatings (maintenance coatings) based on the following specifications: 50 g/L VOC for all interior coatings and 50 g/L VOC for all exterior coatings.

BIOLOGICAL RESOURCES

MM BIO-1a: To the extent feasible, construction activities should be scheduled to avoid the nesting season. If construction activities are scheduled to take place outside the nesting season, all impacts on nesting birds protected under the MBTA and California Fish and Wildlife Code will be avoided. The nesting season for most birds in Santa Clara County extends from February 1 through August 31.

MM BIO-1b: If construction activities occur within the nesting season (February 1 through August 31), then preconstruction surveys for nesting birds should be conducted by a qualified ornithologist to ensure that no nests will be disturbed during project implementation.

These surveys would be conducted no more than seven days prior to the initiation of construction activities. During this survey, the ornithologist will inspect all trees and other potential nesting habitats (e.g., trees, shrubs, ivy, and buildings) in and immediately adjacent to the impact areas for nests. If an active nest is found sufficiently close to work areas to be disturbed by these activities, the ornithologist will determine the extent of a construction-free buffer zone to be established around the nest (typically 300 feet for raptors and 100 feet for other species), to ensure that no nests of species protected by the MBTA and California Fish and Wildlife Code will be disturbed during project implementation.

MM BIO-1c: If construction activities will not be initiated until after the start of the nesting season, all potential nesting substrates (e.g., bushes, trees, grasses, and other vegetation), planned for removal, will be removed prior to the start of the nesting season (e.g., prior to February 1). This will preclude the initiation of nests in this vegetation, and prevent the potential delay of the Project due to the presence of active nests in these substrates.

MM BIO-2: The following measures will be implemented to minimize impacts on roosting bats:

 Within 30 days prior to demolition of any building, a qualified biologist will conduct a survey for evidence of bat use. If evidence is observed, or if potential roost sites are 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 121
City of Santa Clara
present in areas where evidence of bat use might not be detectable, an evening survey and/or nocturnal acoustic survey will be conducted to determine if the bat colony is active and to identify the specific location of the bat colony.  If a maternity roost of any bat species is present, the bat biologist will determine the extent of a construction -free buffer (typically 100 feet) around the active roost that will be maintained. This buffer will be maintained from April 1 until the young are flying, typically after August 31.
 If a nonbreeding bat roost (i.e., a non -maternity roost, or a roost occupied between September 1 and March 31) is found in a structure that must be physically disturbed, a avoid injury or mortality during demolition. For projects within the future buildout area within the LSAP, impacts to roosting bats are also expected to be considered less than significant under CEQA with incorporation of the mitigation measure described above.

MM BIO-3a: During detailed design of project activities, trees over which the City claims jurisdiction will be avoided to the extent feasible. If it is determined during detailed design of the project that impacts on some trees can be avoided, a construction phase Tree Preservation Plan shall be prepared by a certified arborist prior to initiation of construction. The Tree Preservation Plan will describe how trees that are not proposed for removal will be protected. The construction -phase Tree Preservation Plan shall include the following tree protection measures:

 A standard Tree Protection Zone (TPZ) will be established. The TPZ will surround individual trees or groups of trees, to ensure that the tree trunk, canopy, and root system of each tree is protected from damage during construction activities.  Protect tree root systems from damage caused by (a) runoff or spillage of noxious materials and (b) ponding, eroding, or excessive wetting caused by dewatering operations through use of the following measures during excavation and grading:

Excavation: Trenching will not occur within the TPZ.

Excavation under, or around, tree roots will be done by hand and to a depth of 3 feet.

Grading: Existing grades will be maintained within TPZs. Where existing grade is 2 inches or less below elevation of finish grade, backfill with topsoil or native site soil will be applied.

 6-inch average thickness wood bark mulch will be placed inside TPZs.  Fencing will be installed along edges of TPZs before building material or equipment is brought on site and construction operations begin. Maintain fence will remain in place until construction operations are complete and equipment has been removed from site.
 Temporary irrigation will be provided to all trees in TPZs using a temporary on-grade drip or bubbler irrigation system sufficient to wet the soil within tree protection zones to a depth of 30 inches per bi-weekly irrigation event.

MM BIO-3b:

 To the extent that the construction-phase tree protection measures, described above under Mitigation Measure BIO-3a, are not feasible, the project applicant will comply with the standards of the Protected Tree Removal Permit, which requires mitigation 5 – Applicable Mitigation Measures
122 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
for the removal of protected trees. A certified arborist will review the development areas after all construction has been completed.
 All trees, proposed for removal, that fall under the jurisdiction of the City shall be replaced at a 2:1 ratio, unless otherwise specified by the Protected Tree Removal Permit. The replacement trees will be standard 24 -inch box size tr ees or larger.

Replanting shall occur in appropriate habitat in the City limits within 6 months of tree removal.

CULTURAL RESOURCES

MM CUL-1: Projects within the LSAP that would require demolition of buildings older than 50 years would be subject to the following measures:

 Evaluation: Any buildings within the study area that are or will reach 50 years of age prior to demolition will be evaluated for significance (CRHR eligibility) in accordance with the criteria in 36 CEQA Section 15064.5▪ Recordation: Appropriate Department of Parks and Recreation forms (DPR 523) will be prepared and submitted by the project applicant.

MM CUL-2: According to CEQA Section 15126.4 avoidance of historical resources is the preferred mitigation. If avoidance is not feasibl e, an appropriate plan (archaeological monitoring plan or testing plan) should be prepared to mitigate adverse effects to the site. The plan should be limited to the area of adverse effect.

Before construction, True Life Companies and future development, shall obtain the services of a qualified archaeological consultant to analyze specific project impacts and ground disturbance in order to prepare an appropriate archaeological monitoring plan (AMP) or archaeological testing plan (ATP) to ensure there are n o adverse impacts to CA-SCL-134, and to address the possibility that project construction may impact previously unknown buried archaeological resources.

Archaeological testing, monitoring, and any resulting data recovery shall be conducted by a professional archaeologist in compliance with CEQA Guideline Section §15064.5.

In addition, the professional archaeologist should consider the results of Native American consultation and provide for a Native American monitor when applicable during future monitoring or testing.

MM CUL-3: In accordance with CEQA Guideline §15064.5 (f), should any previously unknown historic-period resources, including but not limited to glass, metal, ceramics, wood, privies, trash deposits or similar debris, be discovered in any of the four project sponsor areas during grading, trenching, or other on-site excavation(s), earthwork within 25 feet of these materials shall be stopped until a qualified professional archaeologist has an opportunity to evaluate the potential signif icance of the find and suggest appropriate mitigation(s), as determined necessary to protect the resource.

Should any previously unknown prehistoric resources be discovered during grading, trenching, or other on-site excavation(s), earthwork within 25 feet of these materials shall be stopped until a qualified professional archaeologist and the Native American contacts are consulted. The Native American contacts should include those consulted during preparation of the CRAR. The qualified professional archaeologist and Native American contacts would have an opportunity to evaluate the potential significance of the find and 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 123
City of Santa Clara
suggest the appropriate steps to protect the resource. Such prehistoric resource could include charcoal, obsidian or chert flakes, grinding bowls, shell fragments, bone, or pockets of dark, friable soils. These may include some or all of the following:

(A) According to CEQA Section 15126.4, avoidance is the preferred mitigation. Since CEQA provisions regarding the preservation of historic resources direct that adverse effects to historic resources shall be avoided, if feasible, the resource shall be protected from damaging effects through avoidance.
(B) Avoidance can include, but is not limited to, the following options:

1. Planning construction to avoid the historic site.

2. Incorporation of sites within parks, green space, or other open space.

3. Capping the historic site with a layer of chemically stable soil before construction.

Capping the historic site would include installation of a water permeable protective barrier that is covered with a 3-ft.-thick layer of chemically stable soil before constructing non -intrusive facilities on the site. Excavation for landscaping, irrigation or any other purpose shall be limited to the soil layer above the water permeable protective barrier. If the soil layer cannot accommodate all planned underground utilities, a thicker soil layer may be used to cover the site.

4. Deeding the site into a permanent conservation easement.

(C) If avoidance of any previously undiscovered archaeological site is not feasible, data recovery shall be conducted in accordance with an approved Archaeological Data Recovery Plan (ADRP) to mitigate adverse effects to the significance of the site – the area of data recovery being limited to the area of adverse effect. A professional, qualified archaeologist shall conduct data recovery in compliance with CEQA Guideline Section §15064.5. Once the site has been properly tested, subject to data recovery, or preserved to the satisfaction of the professional archaeologist in compliance with CEQA Guideline §15064.5, the site can be further developed.

MM CUL-5: Section 7050.5(b) of the California Health and Safety code shall be implemented in the event that human remains, or possible human remains, are located within the study area during project-related construction excavation. Section 7050.5(b) states:

In the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains until the coroner of the county in which the human remains are discovered has determined, in accordance with Chapter 10 (commencing with Section 27460) of Part 3 of Division 2 of Title 3 of the Government Code, that the remains are not subject to the provisions of Section 27492 of the Government Code or any other related provisions of law concerning investigation of the circumstances, manner and cause of death, and the recommendations concerning treatment and disposition of the human remains have been made to the person responsible for the excavation, or to his or her authorized representative, in the manner provided in Section 5097.98 of the Public Resources Code.

The County Coroner, upon recognizing the remains as being of Native American origin, is responsible to contact the NAHC within 24 hours. The Commission has various powers and duties, including the appointment of a Most Likely Descendant (MLD) to the project. 5 – Applicable Mitigation Measures
124 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
The MLD, or in lieu of the MLD, the NAHC, has the responsibility to provide guidance to project proponents as to the ultimate disposition of any Native American remains.

GEOLOGY AND SOILS

MM CUL-4: A discovery of a paleontological specimen during any phase of the LSAP buildout shall result in a work stoppage in the vicinity of the find until it can be evaluated by a professional paleontologist. Should loss or damage be detected, additional protective measures or furt her action (e.g., resource removal), as determined by a professional paleontologist, shall be implemented to mitigate the impact.

HAZARDS AND HAZARDOUS MATERIALS

MM HAZ-1: Some components encountered as part of building demolition may contain hazardous materials. Materials that may result in possible risk to human health and the environment when improperly managed include lamps, thermostats, and light switches containing mercury; batteries from exit signs, emergency lights, and smoke alarms; lighting ballasts which contain polychlorinated biphenyl (PCB); and lead pipes or roof vent flashings.

Universal wastes, lubrication fluids, and equipment containing chlorofluorocarbons (CFCs) and hydrochlorofluorocarbons (HCFCs) shall be removed before structural demolition begins. Demolition waste such as fluorescent lamps, PCB ballasts, lead acid batteries, mercury thermostats, and lead flashings have special case -by-case requirements for generation, storage, transportation, and disposal. Before disposing of any dem olition waste, the project developer and the demolition contractor shall determine if the waste is hazardous and shall ensure proper disposal of waste materials

MM HAZ-2: Project applicants within the area of known contamination related to the National Semiconductor superfund site must perform groundwater and vapor testing and, if needed, remediation to ensure that the site poses to risk to construction workers, future residents, or the environment. After demolition of the existing structures and removal of asphalt, the groundwater and vapor sampling will be conducted to evaluate the concentrations of contaminants underlying the site.

If contaminated groundwater or vapor is detected that exceeds safe thresholds for permanent residential development, a Site Management Plan (SMP) approved by the Regional Water Quality Control Board (RWQCB) will be prepared by an environmental professional to establish management practices for controlling and handling identified hazardous materials. The project applicant shall comply with the provisions of the SMP.

The project applicant’s environmental professional shall assist in the implementation of the SMP and shall perform full-time observation services during demolition, excavation, grading and trenching activities. In addition to these requirements, the following protocols shall be established:

If the vapor sampling determines that hazardous vapors exceed recommended levels for permanent residential uses, the project applicant will prepare and submit a vapor mitigation plan (VMP) for approval by the RWQCB and the EPA (United States Environmental Protection Agency). The VMP will include an evaluation of risks to construction workers and future residents, and shall include discussion of site-specific measures to reduce this risk to acceptable levels. In addition, the project developer shall provide financial assurances of adequate funds for long-term operation and maintenance of the VMP, if required.
5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 125
City of Santa Clara
Prior to the start of any construction activity that involves below ground work (e.g., grading, foundation construction, excavation, or utility trenching), a copy of the SMP shall be provided to the contractors for their review, along with any other relevant information regarding risk abatement. Each contractor shall provide such information to its subcontractors.

If groundwater monitoring wells, extraction wells, or conveyance piping are located on- site, measures shall be implemented to protect these features during construction. The RWQCB shall be notified in writing of con struction activities in these areas and, at a minimum, these areas shall be marked and cordoned off. Upon completion of construction activities, wells and associated infrastructure shall be inspected by a qualified environmental professional to determine i f they have been damaged. If these onsite features require decommissioning, the project developer shall obtain the written approval by the RWQCB and other necessary permits. The RWQCB’s written approval shall be submitted to the City.

During project demolition, an environmental professional shall be present to observe soil conditions, monitor vapors with a hand held meter, and determine if additional soil sampling should be performed. Daily Field Reports (DFRs) shall be prepared by the Environmental Professional documenting: 1) the day’s activities; 2) vapor monitoring; 3) soil and groundwater sampling and associated analytical testing; 4) the installation of the vapor barrier system; and , 5) variances with the SMP. Photographs shall be taken to help document information entered in the DFR. When a photograph is taken, the following information shall be written in the daily field report: 1) time, date, location, and, if appropriate, weather conditions; 2) description of the subject photographed; and 3) name of person taking the photograph.

Perimeter air monitoring shall be conducted at the site during any activity that significantly disturbs site soil (e.g., grading, foundation construction, excavation, or utility trenching) to document the effectiveness of dust control measures. If dewatering is required, the means and methods to extract, treat and dispose groundwater also shall be presented to the RWQCB for their written approval. This written approval shall be submitted to the City.

Appropriate measu res shall be implemented to reduce soil vapor and groundwater migration through trench backfill and utility conduits. Such measures shall include placement of low -permeability backfill “plugs” at specified intervals on -site and at all locations where the utility trenches extend off -site. In addition, utility conduits that are placed below ground water shall be installed with water -tight fittings to reduce the potential for ground water to migrate into the conduits.

Upon completion of construction activities, the environmental professional shall prepare a report documenting compliance with the SMP; it shall contain a summary of: 1) vapor monitoring; 2) groundwater monitoring; 3) the installation of the vapor barrier system; and 4) variances to the S MP. This report shall be submitted to the RWQCB and EPA.

Written approval of the completion report by the RWQCB shall be provided to the City.

The project applicants shall record a new Covenant and Environmental Restriction on Property (Deed Restriction) in accordance with the requirements of California Civil Code Section 1471. The new deed restriction will prohibit extraction of groundwater for purposes other than monitoring and remediation and will require that activities that 5 – Applicable Mitigation Measures
126 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
disturb the soil beneath t he site, such as grading, excavation or removal, shall be in accordance with the SMP.

MM HAZ-3: The following steps shall be implemented to reduce the risk of adverse public health impacts or environmental hazards resulting from soil and groundwater contaminants within the study area.

Reporting Requirements

Prior to issuance of demolition, grading, or building permits, project applicants shall submit a Phase I Environmental Site Assessment (ESA) to the City ’s Fire Prevention/Hazardous Materials Division. The reports shall make recommendations for the preparation of additional subsurface sampling (Phase II) and/or remedial action (Phase III), if appropriate, and should be signed by a Professional Geologist or Professional Engineer.

If the environmental site assessment reports recommend remedial action, the project applicant shall:

 Consult with the appropriate local, state, and federal environmental regulatory agencies to ensure sufficient minimization of risk to human health and environmental resources, both during and after construction, posed by soil contamination, groundwater contamination, or other surface hazards including, but not limited to, underground storage tanks, fuel distribution lines, waste pits, and sumps. ▪ Obtain and submit written evidence of approval for any remedial action if required by a local, state, or federal environmental regulatory agency.
 Submit a copy of all applicable documentation required by local, state, and federal environmental regulatory agencies, including but not limited to: permit applications, Phase I and II environmental site assessments, human health and ecological risk assessments, remedial action plans, risk management plans, soil management plans, and groundwater management plans.

Best Management Practices During Construction

 Project applicants shall implement the following Best Management Practices (BMPs) regarding potential soil and groundwater contamination throughout demolition, grading, and construction activities.
 Soil removed from the site during project construction shall be stockpiled in a secure and safe manner. All contaminated soils determined to be hazardous must be adequately sampled prior to acceptable reuse or disposal at an appropriate off -site facility. Specific sampling and handling and tran sport procedures for reuse or disposal shall be in accordance with the requirements of applicable local, state and federal agencies, including the RWQCB, the Santa Clara County Department of Environmental Health (SCCDEH), and/or the City ’s Fire Prevention/Hazardous Materials Division.
 Groundwater pumped from the subsurface shall be contained onsite in a secure and safe manner, prior to treatment and disposal, to ensure environmental and health issues are resolved pursuant to applicable laws and p olicies of the City of Santa Clara, SCCDEH, and/or the RWQCB. Engineering controls shall be utilized, which may include impermeable barriers to prohibit groundwater and vapor intrusion into 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 127
City of Santa Clara
the proposed buildings (pursuant to the review and approval of the Fire Prevention/Hazardous Materials Division and/or SCCDEH).  Prior to issuance of any demolition, grading, or building permit, the applicant shall submit for review and approval by the Fire Prevention/Hazardous Materials Division, written verification that the appropriate federal, state or county oversight authorities, including but not limited to the SCCDEH and RWQCB, have granted all required clearances and confirmed that the all applicable standards, regulations and conditions for all previous contamination at the site.

HYDROLOGY AND WATER QUALITY

MM HYD-1: In the event groundwater is encountered during construction activities, onsite dewatering would be required. The discharge of any dewatered groundwater would comply with BMPs as described in the SWPPP, and if found to be contaminated would be handled as described in Mitigation Measure HAZ-2 and HAZ-3.

NOISE

MM NOI-1: Due to the number of variables inherent in the mechanical equipment needs of new buildings (number and type of units, locations, size, housing or enclosures, etc.), the impacts of mechanical equipment noise on adjacent noise -sensitive uses shall be assessed during the final stage of project design for Phase 1 development. Design planning shall take into account the noise criteria associated with such equipment and use site planning to locate equipment in less noise-sensitive areas, where feasible. Other controls could include, but shall not be limited to, fan silencers, enclosures, and screen walls.

An acoustical study shall be prepared during final project design to evaluate the potential noise generated by building mechanical equipment and to identify the necessary noise controls that are included in the design to meet the City’s 55 dBA daytime and 50 dBA nighttime noise limits. The study shall be submitted to the City of Santa Clara for review and approval prior to issuance of any building permits.

MM NOI-2: Future developers will evaluate noise impacts on surrounding sensitive land uses once project-specific information, suc h as type and size of the retail uses, loading zone locations, hours of operation, and frequency of deliveries, is available. Due to the close proximity of the proposed retail uses to the proposed residential uses, noise impacts could be reduced with the implementation of the following measures:

 Move loading zones inside (e.g., within parking structures), where possible, and as far from adjacent residential uses as possible.
 Implement a no idling policy at all retail locations that requires engines to be turned off after five minutes.
 Recess truck docks into the ground.
 Equip loading bay doors with rubberized gasket type seals to allow little loading noise to escape.

MM NOI-3: The project developer shall develop a construction noise control plan, including, but not limited to, the following available controls:

5 – Applicable Mitigation Measures
128 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
 Ensure that construction activities (including the loading and unloading of materials and truck movements) within 300 feet of residentially zoned property are limited to the hours of 7:00 AM to 6:00 PM on weekdays and between the hours of 9:00 AM and 6:00 PM on Saturdays. No construction is permitted on Sundays or holidays.  Ensure that excavating, grading and filling activities (including warming of equipment motors) within 300 feet of residentially zoned property are limited to the hours of 7:00 AM to 6:00 PM on weekdays and between the hours of 9:00 AM and 6:00 PM on Saturdays. No construction is permitted on Sundays or holidays.  Contractors equip all internal combustion engine -driven equipment with mufflers, which are in good condition and appropriate for the equipment.  Contractors utilize “quiet” models of air compressors and other stationary noise sources where technology exists.
 Locate loading, staging areas, stationary noise-generating equipment, etc. as far as feasible from sensitive receptors when sensitive receptors adjoin or are near a construction project area. Construct temporary noise barriers to screen stationary noise-generating equipment when located near adjoining sensitive land uses.

Temporary noise barriers could reduce construction noise levels by 5 dBA.  Control noise from construction workers’ radios to a point where they are not audible at existing residences bordering the project site.
 Comply with Air Resource Board idl ing prohibitions of uneasy idling of internal combustion engines.
 Construct solid plywood fences around construction sites adjacent to operational business, residences or noise-sensitive land uses.
 A temporary noise control blanket barrier could be erected , if necessary, along building facades facing construction sites. This mitigation would only be necessary if conflicts occurred which were irresolvable by proper scheduling.  Route construction-related traffic along major roadways and as far as feasible from sensitive receptors.
 Businesses, residences or noise -sensitive land uses adjacent to construction sites should be notified of the construction schedule in writing. Designate a "construction liaison" that would be responsible for responding to any local c omplaints about construction noise. The liaison would determine the cause of the noise complaints (e.g., starting too early, bad muffler, etc.) and institute reasonable measures to correct the problem. Conspicuously post a telephone number for the liaison at the construction site.
 Include a disclosure in the lease of the future tenants on the Westlake Urban and True Life Companies properties that provides information regarding the on -going construction activities at the SummerHill Homes development and futu re development sites.

TRANSPORTATION

MM CUM-TR-1: Project applicants shall add a southbound right-turn lane to Intersection #29: Grea t America Parkway/Tasman Drive based on their project’s fair share contribution. The City of Santa Clara shall determine the calculation of fair share accordingly during future design phases.

MM CUM-TR-2: Project applicants shall add a northbound and southbound left-turn lane and left-turn phasing adjustment (from split to protected) in the northbound and southbound direction to Intersection #36: Bowers Avenue/Monroe Street based on their project’s 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 129
City of Santa Clara
fair share contribution. The City of Santa Clara shall determine the calculation of fair share accordingly during future design phases.

MM CUM-TR-4: Project applicants shall add a westbound right-turn lane to Intersection #30: Great America Parkway/Mission College Boulevard based on their project’s fair share contribution. The City of Santa Clara shall determine the calculation of fair share accordingly during future design phases.

MM CUM-TR-5: Project applicants shall add a second eastbound left-turn lane to Intersection #35:

Bowers Avenue/Kifer Road based on their project’s fair share contribution. The City of Santa Clara shall determine the calculation of fair share accordingly during future design phases.

UTILITIES AND SERVICE SYSTEMS

MM UTIL-1: Future development allowed under the LSAP would be subject to project -level environmental review. Before the CEQA documentation for future development can be approved, the City must have a solid waste disposal location to fulfill the needs of development beyond 2024.

The following subsequent Tasman East Specific Plan EIR mitigation measures are incorporated by reference and are applicable to the proposed project:

AIR QUALITY

MM AQ-1.1: During any construction period ground disturbance, the applicant shall ensure that the project contractor implements the following BAAQMD BMPs:

 All exposed unpaved surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day.  All haul trucks transporting soil, sand, or other loose material off -site shall be covered.
 All visible mud or dirt track -out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.
 All vehicle speeds on unpaved roads shall be limited to 15 miles per hour (mph).  All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.
 Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to five minutes (as req uired by the California Airborne Toxics Control Measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points.
 All construction equipment shall be maintained and prope rly tuned in accordance with manufacturer ’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.  Post a publicly visible sign with the telephone number and person to con tact at the construction firm regarding dust complaints. This person shall respond and take 5 – Applicable Mitigation Measures
130 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations.
 The contractor shall install temporary electrical service whenever possible to avoid the need for independently powered equipment (e.g. generators).

MM AQ-1.2: Construction criteria pollutant and TAC quantification will be required on a project-level basis for individual development projects once those details are available through modeling to identify impacts and, if necessary, include measures to reduce emissions.

The analysis must be submitted for City review and approval, once complete. Health risks from co nstruction TACs shall be reduced below 10 in one million excess cancer cases, a hazard index of 1.0, and PM2.5 emissions of 0.3 μg/m3. Criteria pollutant emissions shall not exceed BAAQMD construction criteria pollutant emissions thresholds. Reduction in emissions can be accomplished through, though is not limited to, the following measures:

 Construction equipment selection for low emissions;
 Use of alternative fuels, engine retrofits, and added exhaust devices;  Low-VOC paints;
 Modify construction schedule; and
 Implementation of BAAQMD Basic and/or Additional Construction Mitigation Measures for control of fugitive dust.

Site-specific construction schedules and equipment are not known at this time for the future development of the Specific Plan and, therefore, air pollutant emissions have not been quantified at the project-level. Implementation of Mitigation Measure AQ-1.1 would ensure that all construction projects employ the proper BAAQMD -Recommended Measures to Control Particulate Matter Emissions and Mitigation Measure AQ-1.2 would ensure that construction of future development areas under the TESP would be analyzed through project level review to quantify construction criteria pollutant emissions and identify the specific measures needed to reduce potential impacts so as not to exceed BAAQMD construction criteria pollutant emissions thresholds, as necessary. Therefore, with implementation of Mitigation Measure AQ -1.1 and AQ -1.2, the construction emissions impacts from individual development projects under the Tasman East Specific Plan would be reduced to a less than significant level.

MM AQ-2.1: Proposed residential development within the TESP shall implement TDM programs to reduce residential vehicle miles traveled as required by the City’s Climate Action Plan.

The TDM programs would be reviewed and approved by the Community Development Director prior to issuance of building permits. An annual TDM monitoring report shall be submitted to the Community Development Director to document each deve lopment is meeting the required TDM program reductions.

MM AQ-2.2: Proposed development within the TESP shall incorporate additional green building measures such as rooftop solar photovoltaic (PV) systems, rough-ins for electric vehicle charging, use of efficient lighting and irrigation, and recycled water, as feasible, to the satisfaction of the Community Development Director.

MM AQ-2.3: Developed parcels shall require within their CC&Rs and/or ground leases requirements for all future interior spaces to be repainted only with architectural coatings that meet the “Low-VOC” or “Super-Compliant” requirements. “Low-VOC” refers to paints that meet 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 131
City of Santa Clara
the more stringent regulatory limits in South Coast AQMD Rule 1113; however, many manufacturers have reformulated to levels well below these limits. These are referred to as “Super-Compliant” Architectural Coatings.

However, this impact would remain significant and unavoidable given that implementation of a TDM program under the City’s Climate Action Plan would not reduce significant operational ROG and NOx emissions below BAAQMD thresholds of 54 pounds per day. Mitigation measures including TDM programs and green building techniques would not reduce emissions of ROG and NOX to below the BAAQMD significance thresholds for criteria pollutants. The criteria pollutant emissions impacts of the Specific Plan, therefore, would remain significant and unavoidable.

BIOLOGICAL RESOURCES

MM BIO-1.1: Prior to any construction activity in natural habitat/substrate on the extreme eastern portion of the site (i.e., ruderal grassland, perennial freshwater wetland, or riparian habitat), a qualified biologist will examine the impact area for pond turtles and their nests 48 hours before proposed construction activities begin. If a western pond turtle is observed within the work area at any time before or during proposed construction activities, all activities will cease until such time that either (1) the pond turtle leaves the area or (2) the qualified biologist can capture and relocate the animal to suitable habitat away from construction activity.

MM BIO-2.1: Preconstruction surveys for burrowing owls will be conducted prior to the initiation of all construction activities within suitable burrowing owl roosting habitat (i.e., ruderal grassland habitat with burrows of California ground squirrels) in the Specific Plan area, or within 250 feet of this habitat. Preconstruction surveys will be completed in conformance with the CDFW ’s 2012 guidelines. An initial habitat assessment will be conducted by a qualified biologist to determine if suitable burrowing owl habitat is present. During the initial site visit, which will be conducted no less than 14 days prior to the onset of ground disturbing activities, a qualified biologist will survey the entire activity area and (to the extent that access allows) the areas within 250 feet of the site for suitable burrows that could be used by burrowing owls for nesting or roosting. If no suitable burrowing owl habitat (i.e., ruderal grasslands with burrows of California ground squirrels) is present, no additional surveys will be required. If suitable burrows are determined to be present within 250 feet of work areas, a qualified biologist will conduct at least one additional survey to investigate each burrow within the survey area for signs of owl use and to determine whether owls are present in areas where they could be affected by proposed activities. The final survey will be conducted within the 24 -hour period prior to the initiation of construction activities in any given area.

MM BIO-2.2: If burrowing owls are present during the nonbreeding season (generally September 1 to January 31), a 160-foot buffer zone will be maintained around the occupied burrow(s), if feasible. If maintaining such a buffer is not feasible, then the buffer must be great enough to avoid injury or mortality of individual owls. During the breeding season (generally February 1 to August 31), a 250-foot buffer, within which no newly initiated construction- related activities will be permissible, will be maintained between construction activities and occupied burrows. Owls present between February 1 and August 31 will be assumed to be nesting, and the 250 -foot protected area will remain in effect until August 31. If monitoring evidence indicates that the owls are no longer nesting or the young owls are 5 – Applicable Mitigation Measures
132 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
foraging independently, the buffer may be reduced or the owls may be relocated prior to August 31, in consultation with the CDFW.

MM BIO-2.3: Any owls occupying the S pecific Plan area or immediately adjacent areas are likely habituated to frequent human disturbances. As a result, they may exhibit a tolerance of greater levels of human disturbance than owls in more natural settings, and work within the standard 250-foot buffer during the nesting season may be able to proceed without disturbing the owls. Therefore, if nesting owls are determined to be present within the Specific Plan area or within 250 feet of this area, and construction activities cannot feasibly avoid disturbance of the area within 250 feet of the occupied burrow during the nesting season (i.e., February 1 through August 31) due to other seasonal constraints, a qualified biologist will be present during all activities within 250 feet of the nest to monitor the owls’ behavior. If, in the opinion of the qualified biologist, the owls are unduly disturbed (i.e., disturbed to the point of harm or reduced reproductive success), all work within 250 feet of the occupied burrow will cease until the nest is determined to no longer be active by a qualified biologist.

MM BIO-2.4: In the unlikely event that construction will directly impact occupied burrows, a qualified biologist will passively evict owls from burrows during the nonbreeding season (September 1 to January 31). No burrowing owls will be evicted during the nesting season (February 1 through August 31) except with the CDFW ’s concurrence that evidence demonstrates that nesting is not actively occurring (e.g., because the owls have not yet begun nesting early in the season, or because young have already fledged late in the season). Eviction will occur through the use of one-way doors inserted into the occupied burrow and all burrows within impact areas that are within 250 feet of the occupied burrow (to prevent occupation of other burrows that will be impacted). One- way doors will be installed by a qualified biologist and left in place for at least 48 hours before they are removed. The burrows will then be back -filled to prevent reoccupation.

Although relocation of owls may be necessary to avoid the direct injury or mortality of owls during construction, relocated owls may suffer predation, competition with other owls, or reduced health or reproductive success as a result of being relegated to more marginal habitat. However, the benefits of such relocation, in terms of avoiding direct injury or mortality, would outweigh any adverse effects.

MM BIO-3.1: Due to the potential for buildings in the Plan Area to result in high numbers of bird collisions, par ticularly if extensive glass facades are used, all new construction and building additions within the Plan Area will implement the following bird-safe building design considerations:

 Reduce the extent of glass on the facades of new buildings and additions to the extent feasible.
 Reduce or eliminate the visibility of landscaped areas behind glass.  No more than 10 percent of the surface area of a building’s total exterior façade shall have untreated glazing between the ground and 60 feet above ground, unless located within 300 feet of the top of bank of the Guadalupe River. Within such boundary this requirement would extend to the entirety of the structure. Bird-safe glazing treatments may include fritting, netting, permanent stencils, frosted glass, exterior screens, physical grids placed on the exterior of glazing or ultraviolet patterns visible to birds. Vertical elements of the window patterns should be at least 0.25 inches wide at a maximum spacing of four inches or have horizontal elements at least 0.125 inches wide at a maximum spacing of two inches. Any remaining 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 133
City of Santa Clara
untreated glazed areas will be broken up into sections no greater than 24 square feet in size by mullions or bird-safe glazing treatments.
 Avoid free-standing clear glass walls, skywalks, transparent building corners, glass enclosures (e.g., greenhouses) on rooftops, and balconies with unbroken glazed segments 24 square feet and larger where feasible. If any such features are included in building designs, all glazing used in any such features will be 100 percent treated.  Reduce glass at tops of buildings, especially when incorporating a green roof into the building design.
 If a green roof or green wall is incorporated into the building design, no more than 10 percent of the surface area of the building's combined facades within 12 vertical feet above and/or below the green roof or green wall shall have untreated glazing. Any remaining untreated glazed areas will be broken up into sections no greater than 24 square feet in size by mullions or bird-safe glazing treatments.  Avoid the funneling of flight paths between buildings or trees towards a glazed building façade.
 Landscaping, including planted vegetation and water features, shall be designed to minimize the potential for collisions. For example, vegetation providing particularly valuable resources to birds (such as fruits) will be planted away from buildings with extensive glazing, and vegetation in general will be planted in such a way that it is not clearly reflected in windows. Water features would be located away from building exteriors to reduce the attraction of birds toward glazed facades.  Minimize exterior lighting to the extent feasible, except as needed for safety. All exterior lights shall be directed toward facilities in the Plan Area (e.g., rather than directed upward or outward) and shielded to ensure that light is not directed outward toward the Guadalupe River or Ulistac Natural Area.
 Occupancy sensors or other switch control devices shall be installed on interior lights, with the e xception of emergency lights or lights needed for safety purposes. On commercial buildings, these lights shall be programmed to shut off during non-work hours and between 10:00 p.m. and sunrise.

The City may waive or reduce any of the above -listed bird-safe design requirements based on analysis by a qualified biologist indicating that proposed construction will not pose a collision hazard to birds. Such a waiver will generally not be appropriate for façades adjacent to well-vegetated areas, but a waiver may be appropriate, for example, for fa çades that face developed areas lacking vegetation, water features, or other features that would be particularly attractive to birds.

Mitigation measure MM BIO -3.1 would incorporate bird -safe design elements into the future building designs and reduce this impact to the extent feasible. Given the potential for bird strikes to result from implementation of the Specific Plan this impact would be significant and unavoidable.

MM BIO-4.1: To the extent consistent with the normal and expected operations of commercial and/or residential uses under the Specific Plan, take appropriate measures to avoid use of unnecessary lighting at night, especially during the bird migration season (February through May and August through November). Such measures may include the installation of motion -sensor lighting, automatic light shutoff mechanisms, downward- facing exterior light fixtures, and others. Exterior lighting within the Specific Plan area will be shielded as needed to block illumination from shining upward, or outward into the Guadalupe River to the east or Ulistac Natural Area to the south. The intensity of exterior 5 – Applicable Mitigation Measures
134 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
lighting will be minimized, and no exterior uplighting will be used. Lighting plans for each development site shall be reviewed and approved by the Community Development Director prior to the issuance of building permits.

MM BIO-5.1: To the extent feasible, construction activities should be scheduled to avoid the nes ting season. If construction activities are scheduled to take place outside the nesting season, all impacts on nesting birds protected under the MBTA and California Fish and Game Code would be avoided. The nesting season for most birds in Santa Clara County extends from February 1 through August 31.

MM BIO-5.2: If it is not possible to schedule construction activities between September 1 and January 31 then preconstruction surveys for nesting birds shall be conducted by a qualified ornithologist to e nsure that no nests would be disturbed during Plan implementation.

These surveys shall be conducted no more than seven days prior to the initiation of construction activities. During this survey, the ornithologist would inspect all trees and other potential nesting habitats (e.g., trees, shrubs, ruderal grasslands, buildings) in and immediately adjacent to the impact areas for nests.

MM BIO-5.3: If an active nest is found sufficiently close to work areas to be disturbed by these activities, the ornithologist would determine the extent of a construction-free buffer zone to be established around the nest (typically 300 feet for raptors and 100 feet for other species), to ensure that no nests of species protected by the MBTA and California Fish and Game Code will be disturbed during project implementation under the Specific Plan.

A final report of nesting birds, including any protection measures, shall be submitted to the Director of Community Development prior to the start of grading or tree removal.

MM BIO-5.4: If construction activities will not be initiated until after the start of the nesting season, all potential nesting substrates (e.g., bushes, trees, grasses, and other vegetation) that are scheduled to be removed by projects covered under the Specific Plan may be removed prior to the start of the nesting season (e.g., prior to February 1). This would preclude the initiation of nests in this vegetation and prevent the potential delay of a project due to the presence of active nests in these substrates. Any vegetation removal shall occur consistent with required tree removal and grading permits, as applicable.

MM BIO-6.1: If avoidance of the wetlands is not proposed, to compensate for the permanent loss of wetlands, perennial marsh habitat shall be restored or created at a minimum ratio of 2:1 (compensation:impact) on an acreage basis, unless a higher ratio is required by a regulatory agency, in which case that higher ratio shall apply. This ratio is not higher due to the relatively low quality of the wetlands in the project area relative to more extensive, less fragmented wetlands elsewhere along the Guadalupe River, but is not lower due to the temporal loss of wetland functions and values that will result from the lag between impacts to the wetlands in the Plan area and maturation of the mitigation habitat.

Compensation will be provided by creating or restoring wetland habitat so as to achieve the 2:1 ratio (or higher ratio, if required by a regulatory agency) somewhere in the Santa Clara Valley. Among other criteria, the mitigation site(s) must not currently be wetlands.

A qualified biologist shall develop a “Wetland Mitigation and Monitoring Plan” describing the mitigation, which will contain the following components (or as otherwise modified by regulatory agency permitting conditions):

 Summary of habitat impacts and proposed mitigation ratios  Goal of the restoration to achieve no net loss of habitat functions and values 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 135
City of Santa Clara
 Location of mitigation site(s) and description of existing site conditions (among other criteria, the site(s) must not currently be wetlands)
 Mitigation design:

- Existing and proposed site hydrology
- Grading plan if appropriate, including bank stabilization or other site stabilization features
- Soil amendments and other site preparation elements as appropriate - Planting plan
- Irrigation and maintenance plan
- Remedial measures and adaptive management

 Monitoring plan (including final and performance criteria, monitoring methods, data analysis, reporting requirements, and monitoring schedule). Success criteria will include quantifiable measurements of wetland vegetation type (e.g., dominance by natives) and extent appropriate for the restoration location, and provision of ecological functions and values equal to or exceedin g those in the wetland habitat affected. At a minimum, success criteria will include following:

- At Year 5 post-mitigation, at least 75 percent of the mitigation site will be dominated by native hydrophytic vegetation.

The Wetland Mitigation and Monitoring Plan must be approved by the City of Santa Clara prior to the wetland impacts, and it must be implemented within one year following impacts.

Alternatively, mitigation may be provided by restoring or creating at a minimum ratio of 2:1 (compensation:impact) on an acreage basis by either: (a) purchasing credits at a suitably located mitigation bank in the Santa Clara Valley approved by the City of Santa Clara; or (b) donating funds to a project undertaking enhancement or restoration of wetland or riparian habitats in the Santa Clara Valley, approved by the City of Santa Clara.

MM BIO-6.2: In compliance with the NPDES, the Specific Plan will comply with the SWRCB General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities, which requires preparation of a site-specific Stormwater Pollution Prevention Plan (SWPPP) that will include specific and detailed Best Management Practices (BMPs) designed to mitigate construction-related pollutants. These controls will include methods to minimize indirect impacts as a result of construction activities that may compromise water quality in the Eastside Drainage Swale. Additional control measures identified in this SWPPP will mitigate the release of construction-related pollutants from the main site during the various construction phases. Unless otherwise authorized by the RWQCB and in compliance with the NPDES permit issued for the proposed activities, the following measures will be implemented during project implementation to avoid or minimize impacts on water quality:

 All permit conditions, legal requirements, and appropriate dredging and engineering practices shall be followed to avoid and minimize water quality impacts associated with project activities. Suitable erosion control, sediment control, source control, treatment control, material management, and stormwater management BMPs will be 5 – Applicable Mitigation Measures
136 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
implemented consistent with the latest edition of the California Stormwater Quality Association “Stormwater Best Mana gement Practices Handbook,” available at www.capmphandbooks.com.
 Spill prevention kits shall always be in close proximity when using hazardous materials (e.g., crew trucks and other logical locations). Feasible measures shall be implemented to ensure that hazardous materials are properly handled and the quality of wetland and aquatic resources is protected by all reasonable means when removing vegetation and sediments from the channels.
 No fueling shall be done in areas along the Eastside Drainage Swale. For stationary equipment that must be fueled within 50 feet of the swale, containment shall be provided in such a manner that any accidental spill of fuel shall not be able to enter the water or contaminate sediments that may come in contact with water.  A hazardous materials management/fuel spill containment plan will be developed and implemented by the construction contractor and given to all contractors and biological monitors. One copy of the hazardous materials management/fuel spill containment plan located will be on the work site at all times, and will provide construction managers, environmental compliance monitors, and regulatory agencies with a detailed description of hazardous materials management, s pill prevention, and spill response/cleanup measures associated with the construction of the Plan elements. Elements of the materials management/fuel spill containment plan will include, but are not limited to the following:

- A discussion of hazardous ma terials management, including delineation of hazardous material and hazardous waste storage area, access and egress routes, waterways, emergency assembly areas, and temporary hazardous waste storage areas;
- Materials Safety Data Sheets for all chemicals used and stored on site; - An inventory list of emergency equipment;
- Spill control and countermeasures including employee spill prevention/response training;
- Notification and documentation procedures; and
- A monthly reporting plan.

 Vehicles will be checked daily for oil or fuel leaks and will be washed only at an approved area. No washing of vehicles will occur outside of designated staging areas in uplands.
 The work site, areas adjacent to the site, and access areas will be maintained in an orderly condition, free and clear from debris and discarded materials. Personnel will not sweep, grade, or flush surplus materials, rubbish, debris, or dust onto adjacent areas or wetlands or waterways. Upon completion of work, all building materials, debris, unused materials, concrete forms, and other construction -related materials will be removed from the Plan Area.
 Stockpiled materials will be covered by plastic sheeting, tarps, or similar material that can be secured during wind and rain. A sediment fence or berm will be installed around stockpiled material to prevent runoff from transporting sediment into the Eastside Drainage Swale.
 Silt fencing will be erected along the limits of disturbance between the Plan area and the Eastside Drainage Swale.
 As to any portion of the drainage swale that is not culverted, for construction activities occurring within 50 feet of aquatic habitat in the drainage swale, protective measures 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 137
City of Santa Clara
shall be put in place to ensure that impacts on the swale are avoided and minimized.

The following measures shall be implemented during construction:

- Orange construction barrier fencing shall be installed around the boundaries of portions of the drainage swale that are to be avoided prior to the initiation of construction activities.
- The fenced area will be designated as an Environmentally Sensitive Area and will be clearly identified in the construction specifications. - The fencing shall be maintained throughout the grading and construction period. - Grading, construction activities, traffic, equipment, or materials shall be prohibited in fenced wetland areas.

MM BIO-7.1: If avoidance is not proposed, to compensate for the permanent loss of mixed riparian woodland, riparian woodland habitat will be restored or created at a minimum ratio of 2:1 (compensation:impact) on an acreage basis, based on canopy area. This ratio is not higher due to the relatively low quality of the riparian woodland in the Plan Area relative to more extensive, less fragmented riparian woodland elsewhere along the Guadalupe River, but is not lower due to the temporal loss of riparian functions and values that will result from the lag between impacts to the woodland in the Plan Area and maturation of the mitigation habitat.

Compensation will be provided by planting riparian habitat so as to achieve the 2:1 ratio somewhere in the Santa Clara Valley, preferably along the Guadalupe River but along another stream if appropriate. Among other criteria, the mitigation site(s) must not currently be riparian. Mitigation habitat may be hydrologically isolated from the stream in question as long as it is located within 300 feet of the stream, is not separated from the stream by development other than a trail or levee, and is dominated by native riparian trees. Although some portions of the Ulistac Natural Area are more than 300 feet from the Guadalupe River, mitigation anywhere within the Natural Area would satisfy this measure. A qualified biologist shall develop a “Riparian Habitat Mitigation and Monitoring Plan” describing the mitigation, which will contain the following components (or as otherwise modified by regulatory agency permitting conditions):

 Summary of habitat impacts and proposed mitigation ratios  Goal of the restoration to achieve no net loss of habitat functions and values  Location of mitigation site(s) and description of existing site conditions  Mitigation design:

- Existing and proposed site hydrology
- Grading plan if appropriate, including bank stabilization or other site stabilization features
- Soil amendments and other site preparation elements as appropriate - Planting plan
- Irrigation and maintenance plan
- Remedial measures and adaptive management

 Monitoring plan (including final and performance criteria, monitoring methods, data analysis, reporting requirements, and monitoring schedule). Success criteria will include quantifiable measurements of riparian vegetation type (e.g., dominance by natives) and extent appropriate for the riparian restoration location, and provision of 5 – Applicable Mitigation Measures
138 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
ecological functions and values equal to or exceeding those in the riparian habitat affected. At a minimum, success criteria will include following:

- At Year 10 post -planting, canopy closure at the mitigation site will be at least 60 percent of the canopy closure at a nearby reference site (i.e., a site supporting the same habitat type as that being established at the mitigation site).

 The Riparian Habitat Mitigation and Monitoring Plan must be approved by the City of Santa Clara prior to the impact on mixed riparian woodland, and it must be implemented within one year following impacts.

Alternatively, mitigation may be provided by restoring or creating at a minimum ratio of 2:1 (compensation:impact) on an acreage basis by either: (a) purchasing credits at a suitably located mitigation bank in the Santa Clara Valley approved by the City of Santa Clara; or (b) donating funds to a project undertaking enhancement or restoration of wetland or riparian habitats in the Santa Clara Valley, approved by the City of Santa Clara.

MM BIO-8.1: If encroachment into the riparian buffer with incompatible uses (defined as hardscape or other impermeable surfaces, non -native landscape plantings, and paved permeable surfaces such as permeable pavers) is proposed, no buildings shall be constructed closer to the buffer baseline than are currently present (i.e., in one location, a corner of a building is within approximately 95 feet of the buffer baseline, and that limited area can include a building), unless mitigation is provided in accordance with MM BIO -8.2. In addition, no new buildings or structures, impervious surface, or non-native landscaping shall occur closer to the buffer baseline than is currently present (i.e. 75 feet). Compatible uses within these areas are public trails, native landscaping, and unpaved permeable surfaces (e.g. open ground).

MM BIO-8.2: If any encroachment into the riparian buffer is proposed, compensatory mitigation shall be provided to offset the impacts on the ecological functions an d values of the riparian corridor. Such compensatory mitigation will be provided in one of two ways:

 At a minimum ratio of 1:1 (compensation:impact), on an acreage basis excluding wetlands and mixed riparian woodland, existing development (e.g., buildings or hardscape) along the Guadalupe River, either on -site or off-site (e.g., at Ulistac Natural Area), will be removed, and the developed area restored to native habitats and dedicated to natural habitat (rather than active human uses such as urban park).

For example, if a portion of the Plan Area were subject to riparian buffer encroachment, but a commensurate acreage of existing developed areas adjoining the Guadalupe River levee in other parts of the Plan Area were restored to native habitat, that would compensate for the riparian buffer encroachment impact.  At a minimum ratio of 2:1 (compensation:impact) on an acreage basis, riparian woodland habitat will be restored or created as described in Mitigation Measure BIO-

6.1 above to provide ecological functio ns and values that offset those lost due to riparian buffer encroachment.

MM BIO-9.1: During construction under the proposed Specific Plan, all seeds and straw materials used on-site shall be weed-free rice straw (or similar material acceptable to the City), and all gravel and fill material will be certified weed free to the satisfaction of the City and any deviation from this shall be approved by the Public Works Director. 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 139
City of Santa Clara

MM BIO-9.2: During construction of projects under the proposed Specific Plan, vehicles and all equipment shall be washed (including wheels, undercarriages, and bumpers) before and after entering the proposed project footprint. Vehicles will be cleaned at existing construction yards or legally operating car washes.

MM BIO-9.3: Following construction of projects under the proposed Specific Plan, a standard erosion control seed mix (acceptable to the Public Works Director) from a local source would be planted within the temporary impact zones on any disturbed ground that would not be under hardscape, landscaped, or maintained in order to minimize the potential for the germination of the majority of seeds from non-native, invasive plant species.

MM BIO-10.1: Projects proposing or required to retain trees on -site shall implement precautionary measures during site construction to limit adverse environmental effects on ordinance- protected trees that are to be retained. A tree protection plan shall be prepared by a qualified arborist that, at a minimum, requires installation of an open material (e.g., chain link) fence six feet in height around the drip line and maintenance of the existing grade level around a tree and out to its drip line.

MM BIO-10.2: Project proponents under the Specific Plan will comply with the City Code and submit permit applications for removal of all trees covered by the City’s tree ordinance. Any street trees or heritage trees to be removed would require replacement on-site or off-site at a minimum 2:1 ratio per General Plan Policy 5.3.1 -P10. To the extent feasible, the replacement trees will be planted on -site and the project proponent will comply with all other tree removal requirements imposed by the City.

CULTURAL RESOURCES

MM CUL-1.1: A qualified archaeologist shall monitor the demolition of the building foundations and any other below surface disturbances, such as but not limited to, grading, excavation, roadway improvements, potholing for utilities, utility removal, and addressing storm drain issues. After demolition activities and surface impro vements are removed for projects involving excavation, and prior to other construction activities, conduct mechanical presence/absence exploration to a depth ranging from 6.5 to 10 feet below ground surface. Presence/absence efforts shall be conducted by a qualified local archaeologist.

If any cultural resources are identified, all activity in the vicinity of such resources shall stop until a research design and treatment plan shall be prepared to address those types of resources encountered and such plan is approved by the City. Any cultural resources identified shall be evaluated to determine if these resources would qualify for the NRHP or CRHR. If no resources are found during presence/absence testing, the implementation of mitigation measures, MM CUL -1.2 and MM CUL -1.3, would ensure any resources discovered during construction are adequately protected.

MM CUL-1.2: In the event that buried, or previously unrecognized archaeological deposits or materials of any kind are inadvertently exposed during any c onstruction activity, work within 50 feet of the find shall cease until a qualified archaeologist can assess the find and provide recommendations for further treatment, if warranted. Preservation in place is the preferred treatment of an archeological resource. When preservation in place of an archeological resource is not feasible, data recovery, in accord with a data recovery plan prepared and adopted by the City , is the appropriate mitigation. Construction and 5 – Applicable Mitigation Measures
140 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
potential impacts to the area within a r adius determined by the archaeologist shall not recommence until the assessment is complete.

MM CUL-1.3: In the event that human remains are discovered during excavation and/or grading of the site, all activity within a 50 -foot radius of the find shall b e stopped. The Santa Clara County Coroner shall be notified and shall make a determination as to whether the remains are of Native American origin or whether an investigation into the cause of death is required. If the remains are determined to be Native American, the Coroner shall notify the Native American Heritage Commission (NAHC) immediately. Once NAHC identifies the most likely descendants, the descendants will make recommendations regarding proper burial, which will be implemented in accordance with Section 15064.5(e) of the CEQA Guidelines.

GEOLOGY AND SOILS

MM CUL-2.1: Projects involving excavations 25 feet or greater below ground surface would require monitoring by a qualified paleontologist. In the event paleontological resources are discovered all work shall be halted within 50 feet of the find and a Paleontological Resource Mitigation Plan shall be prepared by a qualified paleontologist to address assessment and recovery of the resource. A final report documenting any found resources, their re covery, and disposition shall be prepared in consultation with the Community Development Director and filed with the City and local repository.

HAZARDS AND HAZARDOUS MATERIALS

MM HAZ-1.1: Prior to the start of any demolition or construction activity, a property-specific Phase I ESA shall be completed in accordance with ASTM Standard Designation E 1527-13 (or most recent version) to identify Recognized Environmental Conditions, evaluate the property history, and establish if the property is likely to have been impacted by chemical releases. Soil, soil vapor and/or groundwater quality studies shall subsequently be conducted, if warranted based on the findings on the property-specific Phase I ESAs to evaluate if mitigation measures are needed to protect the health and safety of site occupants. All site mitigation measures identified in the property-specific Phase I and II ESAs shall be completed under the oversight of an appropriate regulatory agency, such as the DEH, DTSC, or RWQCB. Any required cleanup/reme diation of the site during development activities shall meet all applicable federal, state and local laws, regulations, and requirements. The project applicant shall provide the appropriate oversight agency’s written approval of the site mitigation measure s to the City of Santa Clara prior to the issuance of a demolition and/or grading permit.

MM HAZ-1.2: At properties where VOCs are identified as contaminants of concern (COC), the potential for vapor intrusion shall be evaluated. A Vapor Intrusion Investigation Work Plan shall be submitted to the overseeing regulatory agency for review and approval. The plan shall include soil vapor sampling for VOCs in areas of concern. The soil vapor sampling shall be conducted in conformance with DTSC ’s July 2015 advisory titled Active Soil Gas Investigations. A minimum of two soil vapor sampling events (with soil vapor concentrations less than the most conservative residential or commercial screening levels – as appropriate) is required to document that mitigatio n measures are not required; additional sampling events may be required by the overseeing regulatory agency.

5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 141
City of Santa Clara
MM HAZ-1.3: The need for vapor intrusion mitigation measures will be dependent upon the planned building design and the results of the Vapor Intr usion Investigation. Prior to redevelopment of the site, a report assessing the potential for vapor intrusion shall be submitted to and approved by the overseeing regulatory agency. The assessment shall be conducted in general conformance with DTSC ’s Guida nce for the Evaluation and Mitigation of Subsurface Vapor Intrusion to Indoor Air (Vapor Intrusion Guidance) dated October 2011.

MM HAZ-1.4: Prior to the start of any construction activity on properties with known contaminants of concern (COC) exceeding the lower of the then -current DTSC, the RWQCB or Environmental Protection Agency (EPA) residential screening levels, the project proponent shall submit the following plans to the overseeing regulatory agency for review and approval:

 Corrective Action Plan . An appropriate corrective action plan (e.g. remedial action plan, removal action workplace, etc.) shall be prepared that reflects the results of the above investigations. Site cleanup levels presented in the plan shall be based on a target cancer risk of 0.00001 or, for non-carcinogens, a target hazard quotient (THQ) of 1.0. The lower of the then -current DTSC, RWQCB, or EPA residential screening levels shall be used to interpret the TR and THQ levels or, alternatively, a site-specific human health risk as sessment shall be prepared and approved by the overseeing regulatory agency. Higher cleanup goals may be acceptable, if approved in writing by the oversight agency. The project applicant shall provide an oversight agency ’s written approval of the corrective action plan to the City of Santa Clara , prior to issuance of a demolition and/or grading permit. Leaving contaminated soil (above residential screening levels and, for metals, above background concentrations) in- place or re -using contaminated soil shall require the oversight agency ’s written approval. At a minimum, if contaminated soil is left in-place, a deed restriction or land use covenant shall detail the location of the soil. This document shall include a surveyed map of the location of the impacted soil and shall restrict future excavation in the impacted area unless approved in writing by an oversight agency.  Air Monitoring Plan. This plan shall assess the potential for exposure of construction workers and neighboring occupants adjoining the property to COCs during construction activities; this plan shall specify measures to be implemented if COC concentrations exceed threshold values.
 Vapor Intrusion Mitigation Plan and Associated Documents. If the Vapor Instruction Investigation identifies the need for mitigation measures, a Vapor Intrusion Mitigation Plan shall be prepared that describes the measures to be a result of vapor intrusion.

The Vapor Intrusion Mitigation Plan will require the project applicant to design the proposed occupied spaces with appropriate structural and engineering features to reduce risk of vapor intrusion into buildings. At a minimum, this design shall include:
1) passive sub-slab ventilation with a spray applied vapor barrier (And with the ability to convert the system from passive to active ventilation), 2) monitoring to ensure the long-term effectiveness of the remedy, and 3) the implementation of institutional controls. Other designs would be acceptable is approved in writing by the overseeing regulatory agency. The Vapor Intrusion Mitigation Plan shall be submitted for agency review and approval. DTSC ’s October 2011 Vapor Intrusion Mitigation Advisory provides useful guidance in selecting, designing, and implementing appropriate response actions for sites where a potential vapor intrusion risk has been identified.

A completed report shall be submitted to the overseeing regulatory agency upon completion of construction of the mitigation system. The report shall document 5 – Applicable Mitigation Measures
142 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
installation of the vapor control measures identified in the Vapor Intrusion Mitigation Plan and present final as -built design drawings. A Long -Term Operations, Maintenance, and Monitoring Plan (OMMP) also shall be submitted for agency approval that presents the actions to be taken following construction to maintain and monitor the vapor intrusion mitigation system, and a contingency plan should the vapor mitigation system fail. A financial assurance mechanism shall additionally be established (i.e. proof that adequate funds are availabl e for long-term maintenance and monitoring of the vapor intrusion mitigation system) and described in the OMMP.

MM HAZ-1.5: A Site Management Plan (SMP) and Health and Safety Plan (HSP) shall be developed to establish appropriate management practices for handling and monitoring of impacted soil, soil vapor, and groundwater that potentially may be encountered during construction activities. The SMP shall be prepared by an Environmental Professional and be submitted to the overseeing regulatory agency (e.g. RWQCB, DTSC and/or DEH) for review and approval prior to commencing construction activities. The SMP also shall be provided to the City of Santa Clara . Prior to the start of any construction activity that involves below ground work (i.e. mass grading, fou ndation construction, excavating or utility trenching), information regarding site risk management procedures, including copies of the HSP and SMP, shall be provided to the contractors for their review, and each contractor shall provide such information to its subcontractors. The SMP and HSP measures shall be incorporated into the project design documents:

 Site control procedures to control the flow of personnel, vehicles and materials in and out of the site;
 Measures to minimize dust generation, stormwater runoff and tracking of soil off-site;  Protocols for conducting earthwork activities in areas where impacted soil, soil vapor and/or groundwater are present or suspected. Worker training requirements, health and safety measures and material handling procedures shall be described;  Perimeter air monitoring for dust during any activity that significantly disturbs impacted site soil (i.e. mass grading, foundation construction, excavating or utility trenching) to document the effectiveness of dust control measures;  Protocols to be implemented if buried structures, wells, debris, or unidentified areas of impacted soil are encountered during site development activities;  Protocols to characterize/profile soil suspected of being contaminated so appropriate mitigation, disposal or reuse alternatives, if necessary, can be implemented. Soil in contact with impacted groundwater shall be assumed contaminated. All soil excavated and transported from this site shall be appropriately disposed of at a permitted facility;
 Stockpiling protocols for “clean” and “impacted” soil;  Decontamination procedures to reduce the potential for construction equipment and vehicles to release contaminated soil onto public roadways or other off-site transfer;  Procedures to evaluate and document the quality of any soil imported to the site. Soil containing chemicals exceeding residential (unrestricted use) screening levels or typical background concentrations of metals shall not be accepted. The DTSC ’s Clean Fill Advisory (October 2001 or latest version) provides useful guidance on evaluating imported fill;
 Methods to monitor excavations and trenches for the potential presence of VOC impacted vapors. Mitigation protocols shall be developed and implemented in the event elevated VOC vapors are released during excavation activities that may pose 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 143
City of Santa Clara
a risk to construction worker health and/or risk to the health of occupants of neighboring properties;
 Protocols to evaluate if the residual contaminants will adversely impact the integrity of below ground utility lines and/or structures (i.e. the potential for corrosion due to subsurface contamination)
 Measures to reduce soil vapor and groundwater migration through trench backfill and utility conduits. Such measures shall include placement of low -permeability backfill “plugs” at specified intervals on -site and at all locations where the utility trenches (within impacted soil or groundwater) extend off-site. In addition, utility conduits that are placed below groundwater shall be installed with water-tight fittings to reduce the potential for groundwater to migrate into the conduits.  Measures to help reduce the potential for the downward migration of contaminated groundwater if deep foundation systems are proposed. These measures shall be identified in the geotechnical investigation report and implemented as part of the development plans.

MM HAZ-1.6: The project applicant’s environmental professional shall assist in the implementation of the SMP and shall, at a minimum, perform part -time observa tion services during demolition, excavation, grading and trenching activities. Upon completion of construction activities, the environmental professional shall prepare a report documenting compliance with the SMP; this report shall be submitted to the oversight regulatory agency and the City of Santa Clara.

HYDROLOGY AND WATER QUALITY

MM HYD-1.1: A catch basin shall be installed on Lafayette Street or at a suitable location approved by the City Engineer that connects to the existing storm drain system on Calle Del Mundo.

This new catch basin would provide an alternate path for flow that would otherwise have entered the development area prior to placement of project fill. The design of the new catch basin and new storm drain shall be subject to approval of the City. The new catch basin and new storm drain shall be complete and connected to the existing storm drain system on Calle Del Mundo must be made concurrent with redevelopment of the site in the northwest corner of the Plan Area.

NOISE

MM NV-1.1: Comply with construction hours ordinance to limit hours of exposure. The City Code limits construction activities within 300 feet of residentially zoned property to the hours of 7:00 a.m. to 6:00 p.m. on weekdays and between the hours of 9:00 a.m. and 6:00 p.m. on Saturdays. No construction is permitted on Sundays or holidays.

MM NV-1.2: Minimize or avoid using vibratory rollers and tampers near sensitive areas, such as shared property lines with residential land uses. Whenever possible, use cast-in-drilled- holes piles for projects requiring deep foundations to reduce construction vibration.

MM NV-1.3: When vibration-sensitive structures are within 18 feet of a project development site or within 86 feet of a project proposing pile-driving, survey condition of existing structures and, when necessary due to the structure type and resulting vibration due to the construction activities proposed, perform site -specific vibration studies to direct construction activities. Contractors shall continue to mon itor effects of construction activities on surveyed sensitive structures, notify the Community Development Director 5 – Applicable Mitigation Measures
144 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
of any damage caused by vibration, and offer to repair or compensate for any such damage caused by vibration within a time period establishe d by the Community Development Director upon receiving notice pursuant to this measure. The results of the vibration monitoring shall be summarized and submitted in a report to the Community Development Director prior to issuance of an occupancy permit.

MM NV-1.4: Construction management plans for construction projects that have the potential to exceed the 0.3 in/sec. PPV threshold, particularly those involving pil e driving, shall include predefined vibration reduction measures, notification requirements for properties within 200 feet of scheduled construction activities, and contact information for on-site coordination and complaints. The construction management plan shall be submitted to the City for approval prior to issuance of a demolition or grading permit.

MM NV-1.5: Include a disclosure in the lease of future tenants within the Tasman East Specific Plan properties that provides information regarding the on-going construction activities within the area.

MM NV-2.1: Develop and adhere to a construction noise control plan to be submitted to the City for review and approval prior to issuance of a demolition and/or grading permit, including, but not limited to, the following available controls:

 Ensure that construction activities (including the loading and unloading of materials and truck movements) within 300 feet of residentially zoned property are limited to the hours of 7:00 a.m. to 6:00 p.m. on weekdays and between the hours of 9:00 a.m. and 6:00 p.m. on Saturdays. No construction is permitted on Sundays or holidays.  Ensure that excavating, grading and filling activities (including warming of equipment motors) within 300 feet of residentially zoned property are limited to the hours of 7:00 a.m. to 6:00 p.m. on weekdays and between the hours of 9:00 a.m. and 6:00 p.m. on Saturdays. No construction is permitted on Sundays or holidays.  Contractors equip all internal combustion engine -driven equipment with mufflers, which are in good condition and appropriate for the equipment.  Contractors utilize “quiet” models of air compressors and other stationary noise sources where technology exists.
 Locate loading, staging areas, stationary noise-generating equipment, etc. as far as feasible from sensitive receptors when sensitive receptor s adjoin or are near a construction project area. Construct temporary noise barriers to screen stationary noise-generating equipment when located near adjoining sensitive land uses.

Temporary noise barriers can reduce construction noise levels by five dBA.  Control noise from construction workers’ radios to a point where they are not audible at existing residences bordering the project area.
 Comply with Air Resource Board idling prohibitions of uneasy idling of internal combustion engines.
 Construct solid pl ywood fences around construction sites adjacent to operational business, residences or noise-sensitive land uses.
 A temporary noise control blanket barrier could be erected, if necessary, along building facades facing construction sites. This mitigation would only be necessary if conflicts occurred which were unresolvable by proper scheduling.  Route construction-related traffic along major roadways and as far as feasible from sensitive receptors.
5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 145
City of Santa Clara
 Businesses, residences or noise -sensitive land uses adjacent to construction sites should be notified of the construction schedule in writing. Designate a “construction liaison” that would be responsible for responding to any local complaints about construction noise. The liaison would determine the cause of the noi se complaints (e.g., starting too early, bad muffler, etc.) and institute reasonable measures to correct the problem. Conspicuously post a telephone number for the liaison at the construction site.
 Include a disclosure in the lease of future tenants within the Tasman East Specific Plan properties that provides information regarding the on -going construction activities within the area.

MM NV-2.2: If pile driving occurs, the following best management practices shall be included in the construction noise control plan:

 Schedule pile driving during a period when school is not in session.  During pile driving, pre-drill foundation pile holes to minimize the number of impacts required to seat the pile.
 During pile driving activities, install “acoustical blankets” to provide shielding for receptors located within 100 feet of the site, or use a noise attenuating shroud on the pile driving hammer.

TRANSPORTATION

MM TRANS-1.1(9): Tasman Drive and Centennial Drive (City of Santa Clara) – Add a third eastbound through lane.

MM TRANS-1.2(10): Lafayette Street and Great America Way (City of Santa Clara ) – Signalize this intersection prior to occupancy of planned development comprising 30 percent of the project trip generation.

MM TRANS-1.3(11): Lafayette Street and Calle Del Mundo (City of Santa Clara ) – Signalize this intersection prior to occupancy of planned development comprising 70 percent of the project trip generation.

MM TRANS-1.4(37): Montague Expressway and Mission College Boulevard (County of Santa Clara) – This intersection is located in the City of Santa Clara and under the jurisdiction of Santa Clara County. The VTP 2040 project would add a third southbound left- turn lane to the intersection. The project shall ma ke a fair -share contribution towards the additional turn lane.

MM TRANS-3.1(1): Great America Parkway and Westbound 237 Ramps (City of San Jos é/CMP) – Restripe he southbound approach to one through/right -lane and one right -lane, which would not require right-of-way and/or narrowing of the median and would improve intersection operations to an acceptable LOS.

MM TRANS-3.2(9): Tasman Drive and Centennial Drive (City of Santa Clara) – Add a third eastbound and a third westbound through lane.

5 – Applicable Mitigation Measures
146 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
MM TRANS-3.3(10): Lafayette Street/ Great America Parkway and 11. Lafayette Street/Calle Del Mundo – Signalize intersections prior to occupancy of development comprising 30 percent and 70 percent, respectively, of the project trip generation.

MM TRANS-3.4(37): Montague Expressway and Mission College Boulevard (County of Santa Clara) – The VTP 2040 project would add a third southbound left -turn lane to the intersection. The project shall make a fair -share contribution towards the additional turn lane. In order to fully mitigate the project’s impact, a second northbound left turn lane would be needed but right-of-way constraints make this mitigation infeasible. Additionally, an interchange is identified at this intersection as a Tier 2 priority per the Comprehensive County Expressway Planning Study.

MM TRANS-4.1: Sidewalk improvements to Tasman Drive between Calle Del Sol and the Lafayette Street overcrossing would reduce the safety hazard impacts to pedestrians to a less than significant level. Construction of a sidewa lk on this segment of Tasman Drive is a required mitigation for Phase 1 of the City Place project. In the event the new residential buildings within the Plan Area fronting Tasman Drive are constructed prior to City Place Phase 1, such development shall construct the necessary improvements prior to occupancy of the building and would be reimbursed by City Place. Sidewalk improvements to Tasman Drive between Calle Del Sol and the Lafayette Street overcrossing, as needed to address pedestrian safety hazards, s hall be in place prior to occupancy of any new residential buildings within the Plan Area fronting Tasman Drive.

MM C-TRANS-3.1(12): Lafayette Street and Calle De Luna – Reconfiguring the westbound approach to one left-turn lane and one right-turn lane would fully mitigate the impact to an acceptable LOS D and would not require additional right-of-way.

MM C-TRANS-3.2(13): Lafayette Street and Calle De Primavera - Reconfigure the westbound approach to two left-turn lanes and one right-turn lane.

MM C-TRANS-3.3(21): Tasman Drive and Calle Del Sol - Reconfigure the southbound approach to two left-turn lanes and one right-turn lane would fully mitigate the impact.

The following subsequent Patrick Henry Drive Specific Plan EIR mitigation measures are incorporated by reference and are applicable to the proposed project:

AIR QUALITY

MM 5-2A: Implement BAAQMD Basic Construction Mitigation Measures. The City shall require new development projects occurring under implementation of the Patric k Henry Drive Specific Plan to implement the BAAQMD’s Basic Control Mitigation Measures to address fugitive dust emissions that would occur during earthmoving activities associated with project construction. These measures include:

1. All exposed surfaces (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) shall be watered two times per day.

2. All haul trucks transporting soil, sand, or other loose material off -site shall be covered.

3. All visible mud or dir t track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited.
5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 147
City of Santa Clara

4. All vehicle speeds on unpaved roads shall be limited to 15 mph.

5. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used.

6. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points.

7. All construction equipment shall be maintained and properly tuned in accordance with manufacturer’s specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.

8. Post a publicly visible sign with the telephone number and person to contact at the City regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District’s phone number shall also be visible to ensure compliance with applicable regulations.

MM 5-2B: Require a Project-level Construction Assessment for New Development Proposed Under Implementation of the Patrick Henry Drive Specific Plan. The City shall require applicants to submit a quantitative project-level construction criteria air pollutant and toxic air contaminant emissions analysis for future development proposed under implementation of the Patrick Henry Drive Specific Plan. The estimated construction criteria air pollutant and toxic air contaminant emissions shall be compared against the thresholds of significance maintained by the Bay Area Air Quality Management District (BAAQMD) and, if emissions are shown to be above BAAQMD thresholds, the City shall require the implementation of mitigation to reduce emissions below BAAQMD thresholds or to the maximum extent feasible. Mitigation measures to reduce emissions could include, but are not limited to:

 Selection of specific construction equipment (e.g., specialized pieces of equipment with smaller engines or equipment that will be more efficient and reduce engine runtime);
 Requiring equipment to use alternative fuel sources (e.g., electric -powered and liquefied or compressed natural gas), meet cleaner emission standards (e.g., U.S.

EPA Tier IV Final emissions standards for equipment greater than 50-horsepower), and/or utilizing added exhaust devices (e.g., Level 3 Diesel Particular Filter);  Minimizing the idling time of diesel-powered construction equipment to two minutes;  Requiring that all construction equipment, diesel trucks, and generators be equipped with Best Available Control Technology for emission reductions of NOx and PM;  Requiring all contractors use equipment that meets CARB’s most recent certification standard for off-road heavy-duty diesel engines; and
 Application of Low-VOC paints to interior and/or exterior surfaces (e.g., paints that meet SCAQMD Rule 1113 “Low-VOC” or “Super-Compliant” requirements).

MM 5-2C: Use Low- and Super Compliant VOC Architectural Coatings. The City shall require the use of Low- and Super -Compliant VOC Architectural Coatings in maintaining buildings in the Patrick Henry Drive Specific Plan Area through Covenants Conditions and Restrictions (CC&Rs) and Ground Lease. Developed parcels shall require within their CC&Rs and/or ground leases requirements for all future interior spaces to be repainted with architectural coatings that meet the “Low -VOC” or “Super -Compliant” requirements. “Low-VOC” refers to paints that meet the more stringent regulatory limits 5 – Applicable Mitigation Measures
148 Addendum to the General Plan EIR
Public Review Draft November 1, 2023
of South Coas t Air Quality Management District AQMD Rule 1113. “Super-Compliant” refers to paints that have been reformulated to levels well below the “Low-VOC” limits.

MM 5-2D: Implement TDM Program. Proposed residential, retail, commercial, and office land uses within the Patrick Henry Drive Specific Plan Area shall prepare and implement Transportation Demand Management (TDM) programs consistent with the requirements outlined Section 7.3 of the Patrick Henry Drive Specific Plan. Projects shall achieve a minimum reduction in vehicle miles traveled (VMT) of 20 percent compared to baseline conditions (i.e., without internal or external reductions accounted for, such as geographic location, land use interconnectivity, etc.), with at least 10 percent of the reduction coming through project-specific TDM measures (e.g., transit subsidies, telecommuting options, etc.).

MM 5-3A: Implement Mitigation Measure 5-2B.

BIOLOGICAL RESOURCES

MM 6-2: In order to keep current the biological resource evaluation prepared for the Patrick Henry Drive Specific Plan EIR, upon receiving applications for site-specific projects within the Specific Plan Area, the City shall evaluate the need for a specific biological resource survey of the project site and adjacent area that may be indirectly impacted by project work. If no biological resources are determined to be at risk as determined by a qualified biologist, no further survey shall be required. However, if the City determines that biological resources within the project area require further analysis, the project proponent shall be required to conduct a biological resource survey of the habitat and special-status species that may be impacted by project activities, either directly or indirectly. A report shall be provided to the Cit y detailing survey methods, results, and avoidance and minimization measures required to protect any special -status species with potential to be impacted, in accordance with the regulatory protocols of the responsible jurisdictional agencies for the resource in question, including, but not limited to: USFWS, CDFW, and USACE. If no further surveys/investigation is requested by a permitting or other regulatory agency upon receipt of biological survey report, work may proceed as planned.

MM 6-3: Before any project work within the Specific Plan Area, a qualified botanist shall conduct site-specific, focused surveys according to CDFW guidelines to determine presence or absence of special-status plant species on the individual project site and any adjacent potential area of disturbance. A comprehensive, site-wide survey should be conducted within May to September before project work begins, to encompass the Congdon’s tarplant and arcuate bush mallow’s blooming periods. Following the completion of the surveys, a survey results report shall be prepared and provided to the City. This report should include, but should not be limited to, the following: (1) a description of the survey methodology; (2) a discussion of the survey results; and (3) a map showing the survey area and the location of any special -status plants encountered. If no rare plants are found, then no further mitigation would be required.

If rare plants are found during the survey, the number of individuals present shall be documented and the limits of population shall be marked with flagging. The flagged border of the population shall be avoided by construction personnel for the duration of the project. If the species cannot be avoided or may be indirectly impacted, the applicant shall notify CDFW to discuss avoidance, minimization, and mitigation measures as 5 – Applicable Mitigation Measures
Zoning Code Update and General Plan Amendments 149
City of Santa Clara
appropriate for each species population, including measures to be taken and protocols to be followed if special -status plants are inadvertently disturbed during construction activities.

CDFW may require the preparation and implementation of a mitigation plan that details avoidance, preservation, and/or compensation for the loss of individual special -status plant species. Mitigation may include the purchase of mitigation bank credits, preserving and enhancing existing on-site populations, creation of off-site populations through seed collection and/or transplantation and monitoring these populations to ensure their successful establishment, and/or preserving occupied habitat off -site in perpetuity.

Specific amounts and methods of mitigation and/or credits shall be determined in formal consultation with CDFW and USFWS.

MM 6-4: The demolition of any buildings, disturbance of gravel substrate, and/or removal of trees, shrubs, or weedy vegetation shall be avoided during the February 1 through August 31 bird nesting period to the extent possible. If no demolition, gravel disturbance vegetation, or tree removal is proposed during the nesting period, no further action is required. If it is not feasible to avoid the nesting period, the project applicant shall retain a qualified wildlife biologist to conduct a survey for nesting birds at most 14 days prior to the start of removal of trees, shrubs, grassland vegetation, or buildings, including prior to grading or other construction activity. If demolition of buildings, disturbance of gravel substrate, or vegetation removal efforts do not begin within the 14 days following the nesting bird survey, another survey shall be required. The area surveyed shall include all construction sites, access roads, and staging areas, as well as reasonably accessible areas within 150 feet outside the boundaries of the areas to be cleared or as otherwise determined by the biologist and dependent on species’ life history requirements.

If an active nest is discovered in the areas to be directly physically disturbed, or in other habitats within the vicinity of construction boundaries and may be disturbed by construction activities (as determined by the qualified biologist), clearing and construction shall be postponed until the qualified biologist has determined that the young have fledged (left the nest), the nest fails, or the nest is otherwise determined to be inactive by the biologist (i.e. predation).

To avoid impacts to roosting bats that may rarely utilize the Specific Plan Area vegetation and/or vacant buildings for day roosting, the project applicant shall retain a qualified wildlife biologist to conduct a survey for roosting bats at most 14 days prior to the start of demolition of any vacant buildings left with entry and egress points accessible to bats or removal of suitable bat roosting vegetation. If roosting bats are detected, the biologist shall enact a minimum of a 150-foot no-work buffer and confer with CDFW to determine potential roost protection or roost eviction practices. After conferring with CDFW, the protective buffer may be adjusted based on specific roost needs. Once bats have been suitably protected by a buffer and/or safely evicted from roosting sites (as approved by CDFW), construction may resume outside the buffered area.

A nesting bird and roosting bat survey report prepared with the methods and results of the pre-project survey will be submitted to the City for review and approval prior to commencement of construction activities. Any additional construction monitoring, as determined through any necessary coordination/discretionary approvals with the resource agencies, will be documented per requirements set forth in an approved mitigation monitoring and reporting program.
5 – Applicable Mitigation Measures
150 Addendum to the General Plan EIR
Public Review Draft November 1, 2023

CULTURAL RESOURCES

MM 7-1: For any individual project within the Patrick Henry Drive Specific Plan Area that the City determines may involve a property that contains a potentially significant historic resource, the resource shall be assessed by a professional who meets the Secretary of the Interior's Professional Qualifications Standards to determine whether the property is a significant historic resource and whether or not the project may have a potentially significant adverse effect on the historic resource. If, based on the recommendation of the qualified professional, the City determines that the project may have a potentially significant effect, the City shall require the applicant to implement the following mitigation measures:

(a) Adhere to at least one of the following Secretary of the Interior’s Standards:

 Secretary of Interior's Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings; or
 Secretary of Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings.

The qualified professional shall make a recommendation to the City as to whether the project fully adheres to the Secretary of the Interior’s Standards, and any specific modifications necessary to do so. The final determination as to a project's adherence to the Standards shall be made by the City body with final decision-making authority over the project. Such a determination of individual project adherence to the Secretary of the Interior’s Standards will constitute mitigation of the project historic resource impacts to a less-than- significant level (CEQA Guidelines section 15064.5).

(b) If measure (a) is not feasible, the historic resource shall be moved to a new location compatible with the original character and use of the historic resource, and its historic features and compatibility in orientation, setting, and general environment shall be retained, such that a substantial adverse change in the significance of the historic resource is avoided.1 Implementation of measure (b) would reduce the impact to a less- than-significant level.

← All documents from this meeting