3/12/2024 Item 5
City Council
CITY OF Item #5: Silicon Valley Power
IA Bi-Annual Update
1852
RTC 24-237

THE MISSION CIT
March 12, 2024
1 SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Agenda
• Load Growth
• Capital Projects
• Storm Response
• Upcoming Items
2 POST MEETING MATERIAL
1 3/12/2024 Item 5
SVP Historic Load Growth
420
380
340
300
Gigawatt Hours (GWh)
260
-Monthly Energy
-Rolling 12 Month Average
1/1/2011 1/1/2012 1/1/2015 1/1/2016 1/1/2017 1/1/2018 1/1/2019 1/1/2020 1/1/2023 1/1/2024 3 - SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
SVP Receiving Stations Projects to
Increase Reliability and Capacity

NORTHERN
Northern Receiving Station (NRS): •A RECEIVING

STATION
• Relocation of two existing PG&E 115 kV overhead connections and (NRS) CAISO meters, replacing with larger transformers, upgrade of existing main/transfer bus configurations, circuit breakers, disconnect switches OMiss and system protection improvements. col NORTISANTA.
• Replace two NRS 115/60kV Transformers (372 to 672 MVA) SCOTT • NRS 115/60kV Transformer Spare (3rd Transformer) *RECEIVING

STATION AA
Two new NRS 230KV Transformers (560 MVA), existing (SRS) 420MVA) to remain in parallel. KIFER

RECEIVING
• Developed value engineering cost estimates and sequencing plans STATION (KRS)
• Ordered Transformers on January 2024
• Recommendation to purchase circuit breakers May 2024 Santa Clara
2 3/12/2024 Item 5

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
SVP Receiving Stations Projects to
Increase Reliability and Capacity
Scott and Kifer Receiving Stations (SRS & KRS):
• Replaces end of life infrastructure and increases capacity • SRS constructed 1968 and KRS in 1975
• Full Rebuild - New 60kV/115kV Switchgear, control rooms, large ransformers, circuit breakers, disconnect switches, cable sealing Scott Receiving Station relocation of 6okV and 115kV transmission lines associated with • 30% Design Completed
• Ordered Transformers on January 2024
• Recommendation to purchase circuit breakers May 2024
Kifer Receiving Station
5 SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
115kV Transmission Line
Northern to Kifer Receiving Station NORTHERN

RECEIVING
• Project Scope: Construct a new 115kV overhead STATION Oter
transmission line of approximately 2.24 miles between
Northern Receiving Station and Kifer Receiving Station. • Key Items: constructability, existing utilities, power Mission College
delivery, potential growth, aesthetics, tree removals,
maintenance considerations, construction costs, and NORTHLI schedule
KIFER
• Refining preferred route alignment along Lafayette - SCOTTEL RECEIVING

STATION
Street, Bassett Street, and Duane Avenue.
• Council informational report March 19th
LEGEND
3 3/12/2024 Item 5
Electric Utility Capital Projects
CAPITAL PROJECT 2024 2025 2026 2027 2029 2030
CAISO HVDC Transmission
Northern Receiving Station (NRS)
Kifer Receiving Station (KRS)
Scott Receiving Station (SRS)
NRS/KRS 115kV Transmission
60kV Transmission Upgrades
Freedom Circle Substation
San Tomas Substation CAPITAL PROJECT DRIVER
Memorex Substation SYSTEM EXPANSION

ATA CENTER &
Bowers Avenue Substation ARGE DEVELOPMENT
Stender Way Substation RELIABILITY
Martin Avenue Substation
Laurelwood Substation
Juliette Substation Expansion
Esperanca Substation
Democracy Substation
Kifer 50MW Battery Storage
Homestead Substation
7 SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Storm Preparation
Sunday, February 4
6:00 a.m. ...
• SVP T&D Crews and
Troubleshooters prepositioned
for storm working 24-hour
shifts.
• Two six-person T&D crews ALLI
• One Troubleshooter
• Substation and System
Operators prepositioned for
12-hour shifts with 24-hour
coverage.
8 8
3/12/2024 Item 5
- SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Storm Timeline
3:45 p.m. 4:00 p.m. 4:15 p.m. 4:45 p.m. Later that Fwd: adding 102S Outages. Whole feeders 203B 203W, 201S
night 102S-1595 customers
And a momentary outage on 202H.

Quiet until Three feeders Multiple Multiple 18,000+ Sent from my Verizon, Samsung additional additional customers Galaxy smartphone
about 3:45 out at Get Outlook for Android<https://... > p.m. approximately feeders at feeders at out
Fwd: adding whole feeders 101S
• Three 4:00 p.m. approximately approximately 204H, 104H. Adding 102S. Whole 4:45 PM feeders 203B 203W, 201S
minor • 3,500 4:15 PM
101S customer count unknown
outages customers 10,000+ 204H, 2132 customers
104H, 773 customers
out customers
out Sent from my Verizon, Samsung... >
Outages. Whole feeders 203B
203W, 201S Fwd: adding whole feeders 202H,
Whole feeders tripped. 104B, 301U, 102H, 101S, 204H,
203B, 2080 customers 104H.
203W. 1419 customers Adding 102S. Whole feeders 203B
201S. 1001 customers 203W, 201S
202H, 1608 customers
No cause or eta yet. 104B, 2155 customers
301U, 3707 customers
9 SILICON
• VALLEY
POWER.

CITY OF SANTA CLARA
Storm Response
Sunday, February 4 Sunday, February 4 Monday, February 5 3:00 p.m. 6:00 p.m. 4-6:00 a.m.
• Additional resources called • SVP transitioned into Storm • Remaining T&D Crews arrive in Response mode by breaking as scheduled to relieve off • Three-person Substation T&D crews into 2-person going 24hr shift. crew Triage/Damage Assessment
• Three Control room Teams. • 6:00 a.m. - Remaining
operators • Crews isolated, Substation and System
• SVP Management Staff minimized outages and Operators arrive as began repairs. scheduled to relieve off going
shift.
• 3:00 p.m. - Additional SVP
resources allocated for
Triage/Damage Assessment.
10 5
Item 5
3/12/2024
• SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Affected the Entire State
In terms of outage totals, this was one of the top After the brunt of Sunday's storm finally ended, a The Feb. 4 storm brought strong winds, three most damaging, single-day storms on record, staggering 235,000 PG&E customers in the Bay surpassing 65 miles per hour, impacting over only comparable to storms in 1995 and 2008. Area were without power at 5 a.m. Monday. 200,000 of our customers...

PG&E
ief Operating Officer Sumeet Sin KRON 4 Sacramento Municipal Utility District ergency Operations Center in Vacavi
66 storic storms knocked out power for rec out 1.4 million PG&E customers statewide lo As of Wednesday evening, LADWP crews have mber of California wer during the stor restored 82,246 customers since the start of the storm Sunday
LA Times LA Times
LA Department of Water & Power
Actual PG&E Urgent Alert
Report Outages
11 • SILICON
VALLEY
POWER

CITY OF SANTA CLARA

OUTAGES SNAPSHOT
Cheflercury News
• Electric System Impact
- 34 total outages Cheflercury News Storms
- 26 Circuits affected (159 Circuits in the City) pounding • Customers Affected Storm leaves swath of debris, County all areas agenc
damage, darkness in its wake alters of state
- 18,734 Service accounts affected
San Francisto Chronick O
• Customer Accounts The cyclone has wreaked havoc across California, downing trees and power fines, cousing thunderstorms and prompting tornedo and flash - 59,485 customers
- 31% of SVP customers were affected
12 6
Item 5
3/12/2024

SILICON
VALLEY
POWER.

CTY OF SANTA CLARA

OUTAGES AT A GLANCE
• Outage Length
- 5.73 Hrs Average outage length
- 60.13 Hrs Longest outage for 18 customers
- 23 minutes was the shortest prolonged
outage for 1,526 customers
• Outages Duration
- Starting at 4:00 PM on Sunday, February 4
- Ending at 4:45 AM on Wednesday,
February 7
13 SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Winter Storm Effect in Santa Clara
• 39% of outages were under 100 customers
• 44% of outages resolved under 4 hour
• 85% of outages resolved under 8 hours
• 89% of outages resolved under 12 hours
• 11% of outages had outages over 12 hours
• Staffing plan actively managed during storm
response.
• Kaiser Hospital and Schools Prioritization
- Kaiser switched to alternate feed for 7 hours
- 10 of 11 schools restored by 2/5 @ 0500,
1 school restored 2/5 @ 0701.
14 7
3/12/2024 Item 5

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Customer Engagement
• Customer reps worked through the night to Find address or place 237)
communicate with key customers E
- Kaiser hospital, schools #
Call volume strained resources
• 2,100 online forms were submitted to report
outages Zanker
• New Outage Map (only 3 weeks old) unnyvale
- Challenges created by manual input system
- Caught up on Monday S Wolfe Re
Santa Cla
- 90,000 hits
40 KO
Cupertino
Williams Ro
-121.976 37 367 Degrees Esri, NASA, NGA, USGŞIC... esi
15 15

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Customer Engagement
• Emergency Alert Banner across all City websites
• Social Media
- X (Twitter) (10.4 K Followers) - 8 updates
- Facebook (1900 Followers) - 8 updates

ARE YOU

PREPARED POWER WE'RE POWER

ARE YOU
for a power outage? WORKING ON IT
READY? OUTAGE RESTORED
Rosion on Ram Orge
Check out current outages at
We will restore power as soon as possible. SiliconValleyPower.com/OutageMap Thank you for your patience. 0 E
16 8
Item 5
3/12/2024

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Feedback - Negative
What updates? Hasn't been one since this major Too bad the map is completely useless. No Still no power!! 16 hours. They need a better outage started. And BTW your useless map says status, no timelines to fix, numbers of affected way to update people. That map is inaccurate my area has power now, it doesn't, hasn't for 7 customers clearly random. The green area cannot and calling the number gives no information. hrs. Who'd you hire to update it, a 3rd grader be 18 customers. with crayons? Social Media Comment
Social Media Comment Social Media Comment
We've been out of power since 330 pm This is ridiculous, our neighborhood is not even Thank you for the hard work under dangerous yesterday! Went down to main office this listed as affected and we've been manually conditions. I'm starting to understand why it can morning to report our block wasn't on outage pumping water out of our basements for 4 hours, be difficult to communicate/ update in a timely map. Was informed they're aware of our block nobody even picks the phone to report the manner. I would rather the crews continue their but as of yet, no update on outage map and no outage work uninterrupted then have to report their crew to repair transformer on Barton/Flannery as progress back to headquarters. Assuming this is of 130 pm today! Unacceptable! Social Media Comment the reason for the poor or poorly updated communication to customers. Thank you again.

Social Media Comment
Social Media Comment
17 17

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Feedback - Positive
66 lam EVER SO GRATEFUL for our SVP! THANK YOU Thank vou to our wonderful SVP staff who work Thanks for all you do! We can't remember the I THOUSAND TIMES! Now if you don't mind, around the clock to keep our power on in Santa last time our power was out in the Park-Hilmar red to go brag one or my fiends aroun Clara. This last storm was a really rough one and for youreate our are work dresse
Social Media Comment Social Media Comment
Social Media Comment
66 hank you for your work. The hours are long an SVP crews did an outstanding job restoring The District is so grateful to SVP for the incomfortable due to weather. My guess is tha service during yesterday's storms. I can only extraordinary work that has been done. 11 c those working to restore power have families imagine how miserable the working conditions that are making sacrifices and taking on extra were and l appreciate the heroic efforts made by responsibly during this time. I am grateful my all involved. I notice and appreciate their power is back. I have no complaints about the rofessionalism and unwavering commitment. School District me it took. We can't control weather and how a huge contribution to our communit flects the systems we depend on. Thanks agair Resident Email to Council Social Media Comment
18 18
9 3/12/2024 Item 5
* SILICON
VALLEY
POWER.

Outage Communication Improvements
• Will implement Automated Management System to improve Communication • Full meter software upgrades to enable full Outage Management System (OMS)
- Full benefit of AMI
- Approximately 2 years out
- First contract scheduled for Council on March 19
• Pursue interim OMS that does not require AMI
- Automated map and phone system
- Working through NCPA partners to explore options
• Lining up product demonstrations in March
Explore emergency/overflow remote phone answering service 19 SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Upcoming Items
• Next 6 months highlights
- Award of Circuit Breaker Bid for Receiving Stations
- Bond Financing of 3 CIP Transmission Projects
- RFP Switchgear Procurement Package
- RFP for Engineering and Consultant Support Services
- Multiple system expansion contract awards
20 10
3/12/2024 Item 5
City Council
Item #5: Silicon Valley Power
Bi-Annual Update
1852
RTC 24-237

THE MISSION CIT
March 12, 2024