Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

5/7/2024 Item # 10
City Council
Item #10: Agreement with
10 ALO Vendor(s) for the Purchase of
IA High Voltage Circuit Breakers
RTC 24-35
1852

THE MISSION CIT
May 7, 2024

SILICON
VALLEY
OWEL

Y OF SANTA CLA
Agenda
• SVP Receiving Station Upgrades
• SVP Distribution and Customer Dedicated Substations
• Capacity and Reliability Increase
• Request for Proposal (RFP) - High Voltage Circuit Breakers • Direct Negotiations
• Staff Recommendation

POST MEETING MATERIAL
1 5/7/2024 Item # 10

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
SVP Receiving Station Upgrades
• Northern Receiving Station (NRS):

NORTHERN
• Relocation of two existing PG&E 115 kV overhead connections and RECEIVING CAISO meters, additional transformers, upgrade of existing STATION main/transfer bus configurations, circuit breakers, disconnect (NRS) switches and system protection improvements.

Mission Co
• 30% design has been submitted

NORTH SANTA
CLARA
• Early procurement to meet project schedules
SCOTT
#RECEIVING
• Scott and Kifer Receiving Stations (SRS & KRS): AA

STATION
• Replaces end of life infrastructure and increases capacity (SRS) KIFER • Full Rebuild - New 60kV/115kV Switchgear, control rooms, RECEIVING transformers, circuit breakers, disconnecting earthing switches, cable STATION sealing, relocation of 6okV and 115kV transmission lines associated (KRS) with each substation.
• 60% design has been submitted Santa
Clara
• Early procurement to meet project schedules
• SILICON
VALLEY
POWER.

SVP Distribution and
Customer Dedicated Substations
• Esperanca Substation (ESP):

Esperance
• New 60kV/12kV general distribution substation to support "A (ESP) Tasman East, North Santa Clara & Related City Place.
• 60% design has been submitted
Mission Con
• Early procurement to meet project schedules
• Juliette (JUL): SCOTT. ELVD.
• SVP owned and maintained substation providing 12kV service to Intel
• Expansion of existing substation adding in third 60kV/12kV transformer for additional growth
• 60% design in progress
Santa
• Early procurement to meet project schedules Clara
2 5/7/2024 Item # 10

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Capacity and Reliability Increase
Breaker Additions/Replacements Achieves a
Number Goals:
• Replaces equipment with correctly sized
breakers that can adequately protect and
isolate equipment.
• Scott and Kifer Receiving Stations - Over 50
years old (replacing end of life equipment).
• Increase breaker count due to the new
Esperanca Substation, Juliette Substation
Expansion and new bus configurations at all
three receiving stations.

SILICON
VALLEY
POWER.

CHOSANAAR
Request for Proposal (RFP)
• Purchasing Department led the RFP Process for
Table 1 - Breaker Delvery Schedule
selection based on lowest responsive and [NO. | ITEM DESCRIPTION START COMPLETION DATE
responsible bidder. 3/13/2024 4/3/2024
- 53 Companies viewed the RFP, two proposals were 3/132024 4/13/2024 received, out of which 2 were deemed
nonresponsive due to:
• Exceptions to City standard terms and
conditions 22 Cly Review of Draft Design Drawings Submittal 4/132024 428/2024 • Inability to meet delivery requirements
117720246772025
- Bids received from:
• Isberg Nott (GE Grid Solutions, LLC) 822021 By Sotor
• Wesco (Siemens)
| Factory Acceptance Testeg (FAT)
- Staff preformed outreach to multiple vendors and 23oky) of a Cravi Briers (60%V, 115V, & By sever By Scier extended bid deadline by 14 weeks with no
additional results.
6 3
5/7/2024 Item # 10

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Direct Negotiations
High Voltage Circuit Breakers Station(s) Quantity
• Negotiating with several vendors
underway with key considerations 123kV or 145kV*, 4000A, 63kA or 80kA*, SRS, KRS, 36 550kV or 650kV BIL*, SF6, dead tank, NRS, ESP.
being: outdoor, free standing circuit breaker JUL
- Meeting required technical (operated at 60kV nominal voltage) specifications 123kV or 145kV*, 4000A, 63kA or 80kA*, NRS, SRS, 36 550kV or 650kV BIL*, SF6, dead tank, KRS
- Meeting delivery requirements
outdoor, free standing circuit breaker
• 78 Total Breakers Required between (operated at 115kV nominal voltage) all the projects with varying 245kV, 3000A, 63kA, 900kV or 1050kV NRS technical specifications. BIL*, SF6, dead tank, outdoor, free standing circuit breaker (operated at 230kV
• Deliveries are expected to take place nominal voltage) between March 2026 & March 2027.
*Pending negotiations with vendors
7 - SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Staff Recommendations
• Authorize the City Manager to:
- Negotiate and Execute Agreements(s) with vendors) for High Voltage Circuit Breakers with a cumulative total not to exceed $38,000,000 for an approximately three-year agreement term and a five-year warranty period.
- Approve a 15% ($5,700,000) contingency for (a) design changes, (b) any unanticipated issues, or (c) the purchase of additional High Voltage Circuit Breakers. • Authorize the City Manager to (a) take any actions as necessary to implement and administer the Agreements) and associated purchase orders, and (b) negotiate and execute amendments to the Agreements) for any issues that arise during design and fabrication of the High Voltage Circuit Breakers.
8 4
5/7/2024 Item # 10
City Council
Item #10: Agreement with
CITY OF Vendor(s) for the Purchase of
High Voltage Circuit Breakers
RTC 24-35
1852

THE MISSION CIT
May 7, 2024

← All documents from this meeting