39 Item Type SCSA
Requested Description Cost Remaining
Contingency Total Cost
General Building General Areas / Coatings Main Deck (2021/22 Carryover) 2,065,485$ 103,274 $ 2,168,759$ This project replaces and recoats lymtal traffic deck coating at the lower seating bowl and on the 300 and 700 Level Concourses, which are currently showing signs of wear. The deck coating serves as a secondary waterproofing system for the occupied spaces below these areas and also protects and extends the life of the concrete. Periodic replacement and recoating of this system is necessary to maintain the current waterproofing system and maintain the expected life of the structure.
General Buildin
g Levi's Naming Rights Signage Refurbishment (2022/23 Carryover) 1,200,000 60,000 1,260,000 The project refurbishes the current four (4) Levi's Naming Rights signs located above the North and South Scoreboards, west side of the suite tower, and on the east side of the grandstands. The current signs continue to experience lighting failures despite repeated attempts to repair the signs.
General Buildin
g Miscellaneous (2016/17 Carryover) 100,000 5,000 105,000 This project funds general renewal and replacement of flooring, carpeting, millwork, tiles, masonry, granite counters, stainless steel panels and counters, cladding, wall acoustic panels etc. throughout the building as items reach their end of life. The project was originally approved in FY2016/17 but was not completed.
General Buildin
g Miscellaneous (2022/23 Carryover) 100,000 5,000 105,000 This project funds renewal and replacement of general building items to include, but not limited to, architectural finishes, fixtures, coatings, equipment, etc.
General Building New Seating - Bowl Padded Seat Replacement Project - Lower and Mid Level Club Seatin
g Bowl (2022/23 Carryover)
2,905,373 145,269 3,050,642
The approximately 9,500 existing padded seats in the lower seating bowl and middle seating bowl levels will be replaced in this project. The existing padded seats are original from construction and have reached end of life.
The upholstery material on nearly every seat has faded, torn or cracked due to sun and heat exposure. Minor repairs and spot replacements can no longer keep up with the amount of damaged seats found in these locations.
This project will also evaluate the opportunity to replace the existing padded seats with a different breathable elastomeric mesh seating, which may provide a cooler experience on hot days. This project is necessary to provide the expected level of experience to patrons attending Levi's Stadium.
General Building Overhead Doors, Motors, Sensors and Track Replacements (2022/23 Carr
yover)
89,333 4,467 93,800
This project will furnish and install a replacement gate and necessary ancillary equipment at the 200 Level of the exterior ramp location at the south end of the stadium. The original overhead roll gate is damaged and is unable to be repaired. The original gate was installed as part of the stadium construction to assist in the flow of pedestrian traffic at the ramp location.
Stadium Operations staff have used operational procedures to substitute for the non-functional gate. However, replacing the gate will restore the original operational intent of the gate at the ramp.
General Buildin
g Stadium Event Signage (2019/20 Carryover) 128,355 6,418 134,773 This project funds the design, furnishing and installation of new stadium event signage including, but not limited to, tunnel awnings, accessible seating reference areas, lower bowl sections placards, security, mobile signage, and additional fire and building code signage.
General Buildin
g Updated Stadium Wayfinding Signage (2020/21 Carryover) 125,000 6,250 131,250 This project funds the design, furnishing and installation of new wayfinding and information signage to include, but not limited to, new premium/club wayfinding, suite wayfinding, smoking section signs, no smoking signs for around the main and upper concourses, section numbers/floor decals, ADA accessibility signs, Tunnel signs for "no photos/no autographs", etc.
General Buildin
g Women's Locker Room (2019/20 Carryover) 313,450 15,673 329,123 This project converts a portion of the auxiliary locker room area to accommodate a larger private space for female athletes, performers, officials, and other female event day sporting and entertainment professionals visiting or working events at Levi's Stadium. The project will include the design, permitting and construction of alterations necessary to accommodate these new designated spaces necessary to provide equal accommodations.
Santa Clara Stadium Authority
2023/24 CapEx Budget Carryover (Cont.)