Cities Index.
Agreement for Services with Rising Edge Technologies (California), LLC

City Council and Authorities Concurrent
August 27, 2024

Document
Agreement for Services with Rising Edge Technologies (California), LLC
Meeting
August 27, 2024
Body
City Council and Authorities Concurrent
Pages
48
Original file
6.2 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

EBIX Insurance No. S200005310

AGREEMENT FOR SERVICES

BETWEEN THE

CITY OF SANTA CLARA, CALIFORNIA,
AND

RISING EDGE TECHNOLOGIES (CALIFORNIA), LLC

PREAMBLE
This Agreement is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) and Rising Edge Technologies (California), LLC., a Delaware Limited Liability Company, (Contractor). City and Contractor may be referred to individually as a "Party" or collectively as the "Parties."

RECITALS
A. City desires to secure the services of Contractor to provide as-needed maintenance and repair services for electric utility substructure and aerial fiber optic cable ("Services") more fully described in this Agreement, in Exhibit A, entitled "Scope of Services";
B. Contractor represents that it, and its subcontractors, if any, have the professional qualifications, expertise, necessary licenses and desire to provide certain goods and/or required Services and goods of the quality and type which meet objectives and requirements of City; and,
C. The Parties have specified herein the terms and conditions under which such Services will be provided and paid for.

The Parties agree as follows:

AGREEMENT TERMS AND CONDITIONS

1. AGREEMENT DOCUMENTS
The documents forming the entire Agreement between City and Contractor shall consist of these Terms and Conditions and the following Exhibits, which are hereby incorporated into this Agreement by this reference:

Exhibit A - Scope of Services
Exhibit B - Schedule of Fees and Payment Provisions
Exhibit C - Insurance Requirements
Exhibit D - Labor Compliance Exhibit
Agreement with Rising Edge Technologies (California), LLC Page 1 of 66 Exhibit E - Sample Work Authorization Form
This Agreement, including the Exhibits set forth above, contains all the agreements, representations and understandings of the Parties, and supersedes and replaces any previous agreements, representations and understandings, whether oral or written. In the event of any inconsistency between the provisions of any of the Exhibits and the Terms and Conditions, the Terms and Conditions shall govern and control.

2. TERM OF AGREEMENT
A. Unless otherwise set forth in this Agreement or unless this paragraph is subsequently modified by written amendment to this Agreement, the term of this Agreement shall begin on July 1, 2024 and terminate on June 30, 2029 ("Initial Term").

8. After the Initial Term, City reserves the right, at its sole discretion, to extend the term of this Agreement for up to one (1) additional year through May 31, 2030 ("Option Period") as determined by City. Such extension of term shall be authorized through an Amendment to this Agreement executed by the Parties. The Initial Term and Option Period shall collectively be referred to as "Term".

3. SCOPE OF SERVICES & PERFORMANCE SCHEDULE
Contractor shall perform those Services specified in Exhibit A within the time stated in Exhibit A. Time is of the essence.

4. WARRANTY
In addition to those warranties contained in Exhibit A, Contractor expressly warrants that all Services and materials covered by this Agree ment shall be fit for the purpose intended, shall be free from defect and shall conform to the specifications, requirements and instructions applicable to this Agreement. Contractor agrees to promptly replace or correct any incomplete, inaccurate or defective Services or materials at no further cost to City when defects are due to the negligence, errors or omissions of Contractor. If Contractor fails to promptly correct or replace Services or materials, City may make corrections or replace Services or materials and charge Contractor for the cost incurred by City.

5. QUALIFICATIONS OF CONTRACTOR - STANDARD OF CARE
Contractor represents and maintains that it has the expertise in the professional calling necessary to perform the services, and its duties and obligations, expressed and implied, contained herein, and City expressly relies upon Contractor's representations regarding its skills and knowledge. Contractor shall perform such Agreement with Rising Edge Technologies (California), LLC Page 2 of 66 services and duties in conformance to and consistent with the professional standards of a specialist in the same discipline in the State of California.

6. COMPENSATION AND PAYMENT
In consideration for Contractor's complete performance of Services, City shall pay Contractor in accordance with Exhibit B, entitled "SCHEDULE OF FEES AND PAYMENT PROVISIONS." The maximum compensation of this Agreement is Two Hundred and Fifty Thousand Dollars ($250,000), subject to budget appropriations, which includes all payments that may be authorized for Services and for expenses, supplies, materials and equipment required to perform the Services including any taxes. All Services performed or supplies, materials and equipment provided in excess of the maximum compensation shall be at Contractor's expense. Contractor shall not be entitled to any payment above the maximum compensation under any circumstance.

7. TERMINATION
A. Termination for Convenience. City shall have the right to terminate this Agreement, without cause or penalty, by giving not less than Thirty (30) days' prior written notice to Contractor.

B. Termination for Default. If Contractor fails to perform any of its material obligations under this Agreement, in addition to all other remedies provided by law, City may terminate this Agreement immediately upon written notice to Contractor.

C. Upon termination, each Party shall assist the other in arranging an orderly transfer and close-out of services. As soon as possible following the notice of termination, but no later than ten (10) days after the notice of termination, Contractor will deliver to City all City information or material that Contractor has in its possession.

8. ASSIGNMENT AND SUBCONTRACTING
City and Contractor bind themselves, their successors and assigns to all covenants of this Agreement. This Agreement shall not be assigned or transferred without the prior written approval of City. Contractor shall not hire subcontractors without express written permission from City.

Contractor shall be as fully responsible to City for the acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as Contractor is for the acts and omissions of persons directly employed by it.

Agreement with Rising Edge Technologies (California), LLC Page 3 of 66

9. NO THIRD PARTY BENEFICIARY
This Agreement shall not be construed to be an agreement for the benefit of any third party or parties and no third party or parties shall have any claim or right of action under this Agreement for any cause whatsoever.

10. INDEPENDENT CONTRACTOR
Contractor and all person(s) employed by or contracted with Contractor to furnish labor and/or materials under this Agreement are independent contractors and do not act as agent(s) or employee(s) of City. Contractor has full rights to manage its employees in their performance of Services under this Agreement.

11. CONFIDENTIALITY OF MATERIAL
All ideas, memoranda, specifications, plans, manufacturing procedures, data, drawings, descriptions, documents, discussions or other information developed or received by or for Contractor and all other written information submitted to Contractor in connection with the performance of this Agreement shall be held confidential by Contractor and shall not, without the prior written consent of City, be used for any purposes other than the performance of the Services nor be disclosed to an entity not connected with performance of the Services. Nothing furnished to Contractor which is otherwise known to Contractor or becomes generally known to the related industry shall be deemed confidential.

12. OWNERSHIP OF MATERIAL
All material, which shall include, but not be limited to, data, sketches, tracings, drawings, plans, diagrams, quantities, estimates, specifications, proposals, tests, maps, calculations, photographs, reports, designs, technology, programming, works of authorship and other material developed, collected, prepared or caused to be prepared under this Agreement shall be the property of City but Contractor may retain and use copies thereof. City shall not be limited in any way or at any time in its use of said material. However, Contractor shall not be responsible for damages resulting from the use of said material for work outside the scope of the Services, including, but not limited to, the release of this material to third parties.

13. RIGHT OF CITY TO INSPECT RECORDS OF CONTRACTOR
City, through its authorized employees, representatives or agents shall have the right during the Term and for four (4) years from the date of final payment for Services or goods provided under this Agreement, to audit the books and records of Contractor for the purpose of verifying any and all charges made by Contractor in connection with Contractor compensation under this Agreement, including termination of Contractor. Contractor agrees to maintain sufficient books and records in accordance with generally accepted accounting principles to establish the correctness of all charges submitted to City. Any expenses not so recorded Agreement with Rising Edge Technologies (California), LLC Page 4 of 66 shall be disallowed by City. Contractor shall bear the cost of the audit if the audit determines that there has been a substantial billing deviation in excess of five (5) percent adverse to the City.

Contractor shall submit to City any and all reports concerning its performance under this Agreement that may be requested by City in writing. Contractor agrees to assist City in meeting City's reporting requirements to the State and other agencies with respect to Contractor's Services hereunder.

14. HOLD HARMLESS/INDEMNIFICATION
A. To the extent permitted by law, Contractor agrees to protect, defend, hold harmless and indemnify City, its City Council, commissions, officers, employees, volunteers and agents from and against any claim, injury, liability, loss, cost, and/or expense or damage, including all costs and attorney's fees in providing a defense to any such claim or other action, and whether sounding in law, contract, tort, or equity, in any manner arising from, or alleged to arise in whole or in part from, or in any way connected with the Services performed by Contractor pursuant to this Agreement - including claims of any kind by Contractor's employees or persons contracting with Contractor to perform any portion of the Services - and shall expressly include passive or active negligence by City connected with the Services. However, the obligation to indemnify shall not apply if such liability is ultimately adjudicated to have arisen through the sole active negligence or sole willful misconduct of City; the obligation to defend is not similarly limited.

B. Contractor's obligation to protect, defend, indemnify, and hold harmless in full City and City's employees, shall specifically extend to any and all employment-related claims of any type brought by employees, contractors, subcontractors or other agents of Contractor, against City ( either alone, or jointly with Contractor), regardless of venue/jurisdiction in which the claim is brought and the manner of relief sought.

C. To the extent Contractor is obligated to provide health insurance coverage to its employees pursuant to the Affordable Care Act ("Act") and/or any other similar federal or state law, Contractor warrants that it is meeting its obligations under the Act and will fully indemnify and hold harmless City for any penalties, fines, adverse rulings, or tax payments associated with Contractor's responsibilities under the Act.

15. INSURANCE REQUIREMENTS
During the Term, and for any time period set forth in Exhibit C, Contractor shall provide and maintain in full force and effect, at no cost to City, insurance policies as set forth in Exhibit C.

Agreement with Rising Edge Technologies (California), LLC Page 5 of 66

16. WAIVER
Contractor agrees that waiver by City of any one or more of the conditions of performance under this Agreement shall not be construed as waiver(s) of any other condition of performance under this Agreement. Neither City's review, acceptance nor payments for any of the Services required under this Agreement shall be constructed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement.

17. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to City addressed as follows:

City of Santa Clara
Attention: Silicon Valley Power
1500 Warburton Avenue
Santa Clara, CA 95050
and by e-mail at
[email protected] and [email protected] And to Contractor addressed as follows:

Rising Edge Technologies (California), LLC
825W 16th Street
Newport Beach, CA 92663
and by e-mail at [email protected]
The workday the e-mail was sent shall control the date notice was deemed given.

An e-mail transmitted after 1 :00 p.m. on a Friday shall be deemed to have been transmitted on the following business day.

18. COMPLIANCE WITH LAWS
Contractor shall comply with all applicable laws and regulations of the federal, state and local government, including but not limited to "The Code of the City of Santa Clara, California" ("SCCC"). In particular, Contractor's attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Certificate (SCCC section 3.40.060), and Food and Beverage Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally Contractor has read and agrees to comply with City's Ethical Standards
(http://santaclaraca.gov/home/showdocument?id=58299 ).

Agreement with Rising Edge Technologies (California), LLC Page 6 of 66

19. CONFLICTS OF INTEREST
Contractor certifies that to the best of its knowledge, no City officer, employee or authorized representative has any financial interest in the business of Contractor and that no person associated with Contractor has any interest, direct or indirect, which could conflict with the faithful performance of this Agreement. Contractor is familiar with the provisions of California Government Code section 87100 and following, and certifies that it does not know of any facts which would violate these code provisions. Contractor will advise City if a conflict arises.

20. FAIR EMPLOYMENT
Contractor shall not discriminate against any employee or applicant for employment because of race, sex, color, religion, religious creed, national origin, ancestry, age, gender, marital status, physical disability, mental disability, medical condition, genetic information, sexual orientation, gender expression, gender identity, military and veteran status, or ethnic background, in violation of federal, state or local law.

21. NO USE OF CITY NAME OR EMBLEM
Contractor shall not use City's name, insignia, or emblem, or distribute any information related to Services under this Agreement in any magazine, trade paper, newspaper or other medium without express written consent of City.

22. GOVERNING LAW AND VENUE
This Agreement shall be governed and construed in accordance with the statutes and laws of the State of California. The venue of any suit filed by either Party shall be vested in the state courts of the County of Santa Clara, or if appropriate, in the United States District Court, Northern District of California, San Jose, California.

23. SEVERABILITY CLAUSE
In case any one or more of the provisions in this Agreement shall, for any reason, be held invalid, illegal or unenforceable in any respect, it shall not affect the validity of the other provisions, which shall remain in full force and effect.

24. AMENDMENTS
This Agreement may only be modified by a written amendment duly authorized and executed by the Parties.

Agreement with Rising Edge Technologies (California), LLC Page 7 of 66

25. COUNTERPARTS
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.

26. PREVAILING WAGE
In the event the Services require payment of prevailing wage, Contractor shall comply, and ensure its subcontractors comply with Exhibit D.

Contractor certifies that it is aware of the requirements of California Labor Code Sections 1720 et seq. and 1770 et seq., as well as Section 16000 et seq. of Title 8 of the California Code of Regulations, Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure by Contractor or its employees, agents, contractors, and subcontractors to comply with the prevailing wage laws. [SIGNATURES ON NEXT PAGE]
Agreement with Rising Edge Technologies (California), LLC Page 8 of 66 The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives. •

CITY OF SANTA CLARA , CALIFORN IA
a chartered California municipal corporation
Approved as to Form: Dated: ~ ( 1 / 2 o,J. <f
JJa11 (et gatt(M
Daniel Ballin (Jul 30, 2024 13:17 PDT)
111\~ ~ ~
t lsSvAN \p .GROGAN GLEN R. GOOGINS
City Attorney \~~~y Manager
City of Santa Clara
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: ( 408) 615-2210
Fax: (408) 241-6771
"CITY"

RISING EDGE TECHNOLOG IES (CALIFORN IA), LLC
a Delaware Corporation
Dated: 07-22-2024
By (Signature): Eric Otterdahl
Name: Eric Otterdahl
Title: Division Manager
Principal Place of
Digitally signed by Eric Otlerdahl
ON: C=US, E=e_otterdahl@risingedgegro up.com, O=Califomia, OU=REG, CN=Eric Otle rdahl
Dale: 2024.07.22 08:51:10-07'00'
Business Address: 825W 16th Street, Newport Beach, CA 92663 Email Address: e [email protected]
Telephone: (949) 933-3813
"CONTRACTOR"
Agreement with Rising Edge Technologies (California), LLC Page 9 of 66

TABLE OF CONTENTS

EXHIBIT A

SCOPE OF SERVICES
SECTION 1. GENERAL ........................................................................................... 11 SECTION 3. SPECIFIC REQUIREMENTS .............................................................. 15 SECTION 4. REPORTS ........................................................................................... 15 SECTION 5. COMPLETION OF SERVICES ........................................................... 16 SECTION 6. HOURS AND DAYS OF SERVICE ..................................................... 16 SECTION 7. SCHEDULING AND PLANNING ......................................................... 17 SECTION 8. WORK AUTHORIZATION PROCESS ................................................ 17 SECTION 9. APPLICABLE LAWS AND REGULATIONS ........................................ 22 SECTION 10. WORKMANSHIP ................................................................................. 22 SECTION 11. PERMITS AND LICENSES ................................................................. 23 SECTION 12. WARRANTY ....................................................................................... 23 SECTION 13. CITY FURNISHED MATERIALS ......................................................... 24 SECTION 14. WORK AREA ...................................................................................... 24 SECTION 15. CONTRACTOR'S EQUIPMENT, TOOLS, AND MATERIALS ............ 24 SECTION 16. DISPOSAL OF WASTE & SCRAPS ................................................... 25 SECTION 17. SAFETY .............................................................................................. 25 SECTION 18. INJURY/PROPERTY DAMAGE .......................................................... 26 SECTION 19. CONTRACTOR PERSONNEL. ........................................................... 26 SECTION 20. E-BUILDER ......................................................................................... 28 SECTION 21. TRANSPORTATION, SHIPPING AND FREIGHT ............................... 30 Agreement with Rising Edge Technologies (California), LLC Page 10 of 66 SECTION 1. GENERAL

1.1 Contractor shall provide all necessary supervision, labor, and services, plus all tools, equipment, materials, and supplies required to provide as-needed maintenance and repair services for electric utility substructure and aerial fiber optic cable ("Services") for Silicon Valley Power ("SVP"), the Electric Utility of the City of Santa Clara ("City" or "SVP").

1.2 Contractor shall perform the Services in accordance with generally accepted industry best practices and the original equipment manufacturer (OEM) specifications . Any deviations from these specifications must be approved in writing by City.

1.3 Contractor shall perform the Services in accordance with applicable rules and standards including but not limited to:

1.3.1 California Public Utility Commission (CPUC) General Orders 95, 128, 165 or equivalent.

1.3.2 Rules and Regulations adopted by the Santa Clara City Council listed on the website (https://www.siliconvalleypower.com/svp-and-community/rules­ and-regulations) as they may be amended from time to time, including but not limited to:

1.3.2.1 Fiber Optic (FO) 1900 - Fiber Optic Underground

1.3.2.2 FO 1901 - Fiber Optic Splicing and Testing Methods

1.3.2.3 Underground (UG) 0340 - Conduit Spacers

1.3.2.4 UG 0345 - Trench Backfill Requirements

1.3.2.5 UG 0349 - 8' x 1 O' Primary Manhole Full Traffic Installations

1.3.2.6 UG 0350 - 8' x 14' Primary Manhole Full Traffic Installations

1.3.2. 7 UG 1000 - Installation of Underground Substructure by Developers

1.3.2.8 UG 1250 - Encroachment Permit Clearances from Electric Facilities

1.3.2.9 SD 1235 - Tree Planting Requirements near Underground Electric Facilities

1.3.3 Third Party Pole Contract Requirements (Appendix A 1) as it may be amended from time to time.

Agreement with Rising Edge Technologies (California), LLC Page 11 of 66

1.3.4 Fiber Optic Aerial Drawing (Appendix A2) as it may be amended from time to time.

1.4 Contractor will primarily perform Services within the City of Santa Clara limits.

1.5 To the extent not inconsistent with this Agreement, the City's RFP 23-24-34 (including subsequent updates) and Contractor's proposal response dated January 31, 2024, are hereby incorporated by reference herein and shall supplement this Scope of Services and be subject to the terms and conditions of the Agreement. In the event of a conflict between the Agreement (including its Exhibits and the RFP 23-24-34 or Contractor's proposal, the Agreement (including its Exhibits) shall govern.

SECTION 2. SERVICES TO BE PERFORMED

2.1 Electric Utility Substructure Maintenance and Repair Services - Contractor shall:

2.1.1 Provide maintenance and repair services to assess, repair, and restore functionality to electric utility substructures. These repair services include but are not limited to:

2.1.1.1 Discovery work to ascertain the nature and extent of damage to, or failure of, electric utility substructures.

2.1.1.2 Removal, replacement and installation of electric utility substructures to restore service, including, but not limited to:

2.1.1.2.1 Manholes and manholes rings

2.1.1.2.2 Vaults, splice boxes, and pull boxes

2.1.1.2.3 Transformer pads, and switch pads

2.1.1.2.4 Primary and secondary conduit, including streetlight conduit and streetlight foundations

2.1.1.2.5 Pole barriers (guards), also known as bollards

2.1.1.2.6 Low voltage boxes and lids

2.1.1.2.7 Streetlight boxes - various sizes

2.1.1.2.8 Vault lids and vaults - various sizes

2.1.1.2.9 Retaining walls

2.1.1.2.10 Low voltage box tops and extensions
Agreement with Rising Edge Technologies (California), LLC Page 12 of 66

2.1.1.3 Replacement and repair of underground trenching and infrastructure, including, but not limited to:

2.1.1.3.1 Rodding and roping conduit

2.1.1.3.2 Verification of conduit size, conduit fill, and existing fiber box locations

2.1.1.3.3 Proofing conduit for access

2.1.1.3.4 Rerouting conduit

2.1.1.4 Provide installation, replacement, and repair services on all electric utility substructures equipment, including, but not limited to:

2.1.1.4.1 Fiber, fiber cables, and conduit connections

2.1.1.4.2 Transformer pads

2.1.1.4.3 Remote switch pads

2.1.1.4.4 lnnerduct placement

2.1.1.4.5 Placement of chambered maxcell or equivalent with trace wire

2.1.1.4.6 Junction boxes

2.1.1.4.7 Manholes and manhole covers

2.1.1.4.8 Pole barriers

2.1.1.5 Provide concrete and asphalt repairs, including, but not limited to:

2.1.1.5.1 Removal and restoration of concrete (e.g.,
sidewalks)

2.1.1.5.2 Surface, face preparation, and forming

2.1.1.5.3 Concrete apron pouring

2.1.1.5.4 Concrete dowel and replacement

2.1.1.5.5 New sidewalk placement

2.1.1.6 Provide miscellaneous repair services.

Agreement with Rising Edge Technologies (California), LLC Page 13 of 66

2.2 Aerial Fiber Optic Cable Maintenance and Repairs Services Contractor shall provide maintenance and repair services for aerial fiber optic infrastructure and fiber optic cable, including, but not limited to:

2.2.1 Repair and replacement of fiber cable, including traditional and air-blown fiber cables and conduits.

2.2.2 Repair or replacement of wye-casting, intercepting conduits, electric metallic tubing (EMT) for indoor communication conduits, fiber cases and fiber splicing.

2.2.3 Repair and replacement of splice boxes, fiber optic risers, fiber splicing, fiber cases, aerial cables, and strand wreck out.

2.2.4 Repair and replacement of stub poles, pole ground (including ground rods, anchors, pole risers and support strands).

2.2.5 Installation and removal of aerial squirrel guards.

2.2.6 Removal and replacement of non-working cables from fiber cable plant.

2.2. 7 Miscellaneous aerial fiber optic cable maintenance and repair services.

2.3 Additional Services

2.3.1 Provide engineering design services (e.g., traffic plans).

2.3.2 Provide wood and metal pole attachment services for electrical utility substructures and aerial fiber equipment.

2.4 Emergency Services

2.4.1 Contractor shall provide 24-hour emergency services, seven (7) days per week, 365 days per year. Contractor shall provide an answering service contact phone number at which an individual can be reached at any time.

2.4.2 In the event of an emergency, Contractor must respond within two (2) hours of the City's notification via phone or email.

2.4.3 Upon receiving notification from the City, Contractor must have personnel and equipment on-site within ten (10) hours for troubleshooting and within fourteen (14) hours to implement a temporary solution.

2.4.4 Contractor shall resolve the emergency within seven (7) business days.

If for any reason Contractor cannot meet this timeframe, Contractor shall Agreement with Rising Edge Technologies (California), LLC Page 14 of 66 submit a detailed plan and schedule to the City outlining when the emergency will be resolved.

SECTION 3. SPECIFIC REQUIREMENTS

3.1 Contractor is responsible for pumping out the water or effluent from any flooded underground substructure vault that prevents the complete or partial execution of services. Upon pumping out any water or effluent, Contractor must ensure proper disposal in accordance with all applicable local, state and federal regulations.

3.2 Contractor shall provide the following services as required for the performance of the Services:

3.2.1 Logistical planning

3.2.2 Scheduling services

3.2.3 Supervision and administrative support

3.2.4 Program and project management services

3.2.5 Subcontractor management

3.2.6 On-site shoring services

3.2.7 On-site atmospheric testing of vaults, spaces, or similar

3.2.8 On-site confined space rescue team with a minimum crew size of two (2) people

3.2.9 Traffic control services

3.2.10 Professional services, such as soil testing and geotechnical assessments

3.2.11 On-site miscellaneous services including portable restroom facilities, rental equipment such as light standards, generators, and fueling services

3.2.12 Expedited procurement and transportation of materials, parts, and equipment upon request by the City.

SECTION 4. REPORTS

4.1 Service Reports

4.1.1 Within seven (7) business days after final acceptance by the City of Services associated with each Work Authorization (as defined in Section 8), Agreement with Rising Edge Technologies (California), LLC Page 15 of 66 Contractor shall provide a service report to the City, which shall include the following:

4.1.1.1 Type of service, such as preventative maintenance, inspection, or repair services;

4.1.1.2 Summary of existing conditions;

4.1.1.3 Description of noted issues/deficiencies (including photos) and recommended corrective actions;

4.1.1.4 Description of service/repairs performed;

4.1.1.5 Summary list of spare parts and materials inventory, including serial numbers of all parts removed and installed;

4.1.1.6 Other information requested by the City.

4.2 Status Reports

4.2.1 Contractor shall provide regular cost, schedule, and status updates on Services performed during the Term of the Agreement.

4.2.2 Depending on work activity associated with the Services, status updates may be required daily, weekly, or monthly at the direction of City.

4.3 Contractor shall provide all reports in electronic format and hard copy if requested by the City.

SECTION 5. COMPLETION OF SERVICES
All Services shall be completed in a timely, efficient manner to ensure the site, equipment, and/or system are operational as quickly as possible, as provided in the applicable Work Authorization, Purchase Order, Interim Work Order, or Emergency Work Order as defined in Section 8.

SECTION 6. HOURS AND DAYS OF SERVICE

6.1 Workdays. Standard working hours are between 7:00 AM to 7:00 PM PST/PDT, Monday through Friday, excluding holidays. City may permit access during non­ business hours when required and is open to alternative work schedules. Work may extend beyond standard working hours due to factors such as scheduled/unscheduled power outages and traffic control constraints. Contractor must provide written notification to the City in advance if Services are scheduled outside standard working hours/days.

Agreement with Rising Edge Technologies (California), LLC Page 16 of 66

6.2 Work Shift. Regular work shifts are eight hours, coordinated with the City. Permits and other constraints may dictate the times and hours for a work shift to begin and end.

6.3 Non-Business Hours. If conditions at the job site require, Services may extend beyond regular business hours or work shifts. Contractor shall coordinate with the City and obtain written approval (email acceptable) for Services scheduled during non-business hours.

SECTION 7. SCHEDULING AND PLANNING
7 .1 Contractor shall plan, staff and execute scheduled maintenance and inspection services with 30 days' advance notice as requested by the City. Contractor and City shall mutually agree on scheduling outages associated for preventative maintenance services.

7.2 For critical equipment, Contractor may need to work shifts longer than twelve (12) hours per day or alternative shifts, including night shifts. 7 .3 Contractor must be available to provide emergency services as outlined in Section

2.4. SECTION 8. WORK AUTHORIZATION PROCESS

8.1 Contractor acknowledges that Contractor is one of multiple firms selected to perform the Services pursuant to separate agreements. Specific Services will be assigned as set forth in this Section. The City does not guarantee that any specific work will be authorized under this Agreement.

8.2 Non-Emergency Work

8.2.1 When Services are required, City will notify one or more contractors under contract for as-needed maintenance and repair services for electric utility substructures and aerial fiber optic cable to provide a proposal for Services.

City will provide a description of the Services required, the basis of award, the deadline for response, and any other relevant information (Work Request).

8.2.2 Proposal. Contractor shall prepare and submit a proposal (Proposal) for each Work Request that includes:

8.2.2.1 A work plan that includes a detailed description by task of the services to be performed.

8.2.2.2 A project timeline/schedule with discussion on any activities that may impact the project timeline/schedule.

Agreement with Rising Edge Technologies (California), LLC Page 17 of 66

8.2.2.3 A list of Contractor's personnel and subcontractors including subcontractor Department of Industrial Relations (DIR) number where required.

8.2.2.4 Any required drawings or documents.

8.2.2.5 A list of City responsibilities.

8.2.2.6 A final acceptance criteria.

8.2.2.7 An itemized cost proposal showing:

8.2.2.7.1 Hours and hourly rates by position as listed in Exhibit B for both Contractor and subcontractor personnel if
applicable. Indicate labor subject to prevailing wage
requirements.

8.2.2. 7 .2 Parts/materials.

8.2.2.7.3 Rental and/or specialty equipment.

8.2.2.7.4 Reimbursable expenses, in accordance with the limitations set forth in Exhibit B.

8.2.2. 7 .5 Any additional costs such as, but not limited to freight, permits, and fees.

8.2.2. 7 .6 Breakdown of materials and labor sufficient to calculate all required taxes.

8.2.2.7.7 Estimated total cost including any required taxes.

8.2.2.8 All submitted pricing shall be in accordance with the rates authorized in Exhibit B of this Agreement and the Proposal shall include sufficient information for the City to determine that rates are in accordance with the Agreement.

8.2.2.9 Costs for any additional equipment, parts, or services required for completion of Services as detailed in the Work Request and in Contractor's Proposal but not reflected in the Contractor's cost proposal shall be the sole responsibility of the Contractor and at no additional cost to the City.

8.2.2.10 The City will review the Proposal, and may elect to approve it, reject it, or use it as a basis for further negotiations with Contractor.

Agreement with Rising Edge Technologies (California), LLC Page 18 of 66

8.2.2.11 Provided that Contractor's original Proposal includes all items listed in Section 8.2.2, the City and Contractor may negotiate whether the cost for the Work Authorization will be fixed price (lump sum) or based on specific rates of compensation (time­ and-materials) for completion of the services.

8.2.2.12 If a fixed fee or lump sum is authorized by the City, Contractor must include a payment schedule in their final cost proposal.

Contractor's final cost proposal shall be in conformance with Exhibit B and:

8.2.2.12.1 Include a clear breakdown of materials and labor indicating taxable and non-taxable items, along with
an estimate of required taxes.

8.2.2.12.2 Include separation of materials subject to tax so that payment for such materials and the associated taxes
occur in a single payment.

8.2.2.12.3 Payment milestones shall not include payment for labor subject to prevailing wage in advance of such
labor taking place.

8.2.2.13 Contractor must submit a revised Proposal to the City based upon such negotiations.

8.2.3 Work Authorization:

8.2.3.1 If the completion of the services in the Proposal will not result in total costs under this Agreement exceeding the maximum
compensation in Section 6 of the Agreement (when combined with all previously authorized Services), the City may authorize services as set forth in this Section.

8.2.3.2 For Proposals with a total cost exceeding $50,000, Work Authorizations shall be issued in substantially the same format as Exhibit E ("Work Authorization"). Each Work Authorization shall describe the services and deliverables the Contractor must provide, the time limit within which the Contractor must complete the service and deliverables, the system acceptance criteria, warranty provisions, and the compensation for the additional services.

8.2.3.3 Subject to the terms and conditions of this Agreement, Contractor and City will negotiate the specific scope and requirements of each Work Authorization.

Agreement with Rising Edge Technologies (California), LLC Page 19 of 66

8.2.3.4 Each Work Authorization shall have a Purchase Order attached to it. A Purchase Order ("Purchase Order") is a document issued by the City of Santa Clara Finance Department which will reference the terms and conditions of this Agreement and serves as final approval for each Work Authorization, except in those situations set forth in Section 8.2.3.5 below.

8.2.3.5 For Proposals with a total cost less than $50,000, a signed Work Authorization is not required. The City will issue a Purchase Order authorizing services and the Purchase Order will serve as the Work Authorization.

8.2.3.6 Only the Assistant Director of the Electric Utility, Electric Utility Chief Operating Officer, or Chief Electric Utility Officer may, on behalf of the City, execute a Work Authorization.

8.2.4 Changes to Work Authorization:

8.2.4.1 Contractor shall notify the City immediately when a situation occurs that may result in a change to the total project cost or specific line items in a Work Authorization or Purchase Order.

Contractor shall provide the reason for the change specific to each Work Authorization or Purchase Order.

8.2.4.2 If Contractor requires changes to a fixed price Work Authorization, Contractor shall only be permitted to request changes with justification such as additional scope requested by City or unanticipated field conditions. For such changes, Contractor shall submit justification demonstrating that changes in cost are associated with changes in scope. Contractor shall not be entitled to additional compensation for issues such as errors in calculation of original pricing, changes in staff, or other changes that are not directly related to changes requested by City.

8.2.4.3 In the event that unanticipated site conditions or other issues result in costs that exceed the total of the Work Authorization or Purchase Order or changes to line items in a Purchase Order, Contractor shall submit to the City an updated Proposal for review and approval from the City in advance of performing any additional services. The City will issue a new or amended Work Authorization (if required pursuant to Section 8.2.3.2) or Purchase Order (as applicable) to authorize such additional services.

8.2.4.4 In the event that issues are identified that can be most efficiently and economically resolved while on site, changes may be Agreement with Rising Edge Technologies (California), LLC Page 20 of 66 approved verbally (in the field), by telephone, or e-mail by the following authorized individuals: Assistant Director of the Electric Utility, Electric Utility Chief Operating Officer, or Chief Electric Utility Officer. Such authorization shall be defined as an Interim Work Order. Contractor shall provide an updated Proposal within two (2) business days so that such changes can be documented in a Work Authorization and/or Purchase Order.

8.3 Emergency Work Orders

8.3.1 An emergency work order (Emergency Work Order) should be used only in instances of a threat to public health or safety, loss of or damage to property, or serious disruption to essential services. An emergency is defined as an unforeseen event, circumstance, or combination of circumstances that the City reasonably determines to require immediate action.

8.3.2 Emergency Work Orders do not need to be in writing and may only be authorized by the Assistant Director of the Electric Utility, Electric Utility Chief Operating Officer, or Chief Electric Utility Officer. Such verbal authorizations will be confirmed by the City in writing within three (3) business days followed by a Purchase Order or, where applicable, a Work Authorization and Purchase Order.

8.3.3 When emergency services are required, Contractor shall send a Proposal to the City for the required Services as soon as possible, but no later than three (3) business days after starting Services. The Proposal shall be detailed in accordance with Section 8.2 and shall also include all services required including those services already completed or initiated. City will issue a Work Authorization (if required pursuant to Section 8.2.3.2) and a Purchase Order as soon as reasonably practicable.

8.4 A Work Authorization must be consistent with - and cannot alter - the terms and conditions of this Agreement. The terms and conditions of this Agreement shall prevail over any and all terms and conditions contained in a Proposal, Work Authorization, Interim Work Order, or Emergency Work Order - even if the Proposal, Work Authorization, Interim Work Order, or Emergency Work Order expressly states that it is intended to control. Any conflicting terms and conditions in a Work Authorization are invalid and unenforceable.

8.5 Each Work Authorization, Purchase Order, Interim Work Order, and Emergency Work Order including those authorizations issued pursuant to Section 8.3 and

8.2.4.4 shall be incorporated into the Agreement by reference and subject to its terms and conditions and the Services contained therein shall be included within the Services.

Agreement with Rising Edge Technologies (California), LLC Page 21 of 66

8.6 If Contractor begins services or fails to dispute a Purchase Order within three (3) business days, Contractor is assumed to have accepted the terms of the Purchase Order.

8.7 The City (through the individuals listed in Section 8.2.3.6 or, in the case of Purchase Orders, the Finance Department) may terminate a Work Authorization, Purchase Order, Interim Work Order, or an Emergency Work Order for convenience with ten (10) days prior written notice to Contractor. In such event, the Contractor shall have no further rights hereunder, except that Contractor shall be paid for all Services adequately rendered prior to such termination.

8.8 Proposals, pricing, quotes, and invoices are not confidential and will not be treated as confidential even if marked confidential when submitted.

8.9 Except in the case of emergency which shall conform to the conditions of Section 8.3 or where the circumstances in Section 8.2.4.4 apply, Contractor shall not initiate services and the City will not compensate Contractor until the City has (1) executed the Work Authorization for such services, when applicable, (2) issued a Purchase Order, and (3) directed the Contractor to perform services.

SECTION 9. APPLICABLE LAWS AND REGULATIONS

9.1 Contractor shall comply with all applicable present and future federal, state, and local regulations, ordinances and codes including but not limited to the U.S.

Occupational Safety and Health Administration (OSHA), and the California Department of Industrial Relations and the Division of Occupational Safety and Health (Cal/OSHA).

9.2 Where any applicable laws or ordinances conflict with the City's requirements, the more stringent requirement(s) shall be followed. Contractor's failure to be thoroughly familiarized with the provisions of any applicable federal, state, and local regulations, ordinances and codes shall not relieve Contractor from compliance with the obligations and penalties resulting therefrom.

SECTION 10. WORKMANSHIP

10.1 Contractor shall perform all Services in a professional and environmentally responsible manner that meets or exceeds industry and professional standards of performance. All Services shall be performed by a Contractor employee skilled in the particular task to which they are assigned.

10.2 All parts and/or components replaced or newly installed in the system shall be factory new and free of defects in title, materials and workmanship at the time of their delivery and installation. However, if approved by the City, Contractor may Agreement with Rising Edge Technologies (California), LLC Page 22 of 66 use rebuilt parts or new parts from another manufacturer if approved by the original manufacturer and/or City for use in the specific piece of equipment of the system.

10.3 Poor or inferior workmanship, as determined at the sole discretion of the City, shall be removed and replaced to conform to the quality standards of the industry, or otherwise corrected to the satisfaction of the City, at Contractor's sole expense.

10.4 City reserves the right to inspect any Services performed by Contractor and its subcontractors. If, upon inspection, the City determines that there is any unsatisfactory or defective Services, the Contractor must correct the Services at no additional cost to the City.

SECTION 11. PERMITS AND LICENSES

11.1 Contractor shall obtain, maintain, and pay for all licenses, permits, and certificates required by any statute, ordinance, rule, or regulation in order to perform the Services.

11.2 Contractor is responsible for obtaining an 811-dig permit for any Services that require digging.

SECTION 12. WARRANTY

12.1 Services. For each Work Authorization, Purchase Order, Interim Work Order, and Emergency Work Order, all Services shall carry a warranty of a minimum of twelve ( 12) months from the date of completion of Services set forth in each Work Authorization, Purchase Order, Interim Work Order, and Emergency Work Order.

Warranty-related Services shall be at no additional cost to the City.

12.2 Parts. All parts provided by Contractor shall include a warranty of no less than the greater of either twelve (12) months or the manufacturer warranty period of the applicable part. In the event the manufacturer warranty is less than twelve (12) months, Contractor shall extend the manufacturer warranty to a minimum of twelve ( 12) months. All parts fabricated by Contractor by shall include a warranty of twelve ( 12) months. Contractor shall provide the City with a copy of any manufacturer's warranty or extended manufacturer's warranty.

12.3 Contractor shall be responsible for performing all warranty work within a reasonable time. In emergencies where damage may result from delay or where the loss of service may result, the City may choose to perform the work covered in the warranty. The cost associated with the City completing the warranty work shall be charged to Contractor.

Agreement with Rising Edge Technologies (California), LLC Page 23 of 66 SECTION 13. CITY FURNISHED MATERIALS
Contractor shall credit the City for any City-furnished materials that are used, lost, stolen, damaged or rendered unusable by actions of Contractor.

SECTION 14. WORK AREA

14.1 Contractor shall ensure that the work area, where Services or other related work are being performed, is free from all surplus materials, waste materials, debris, spills, dirt and rubbish caused by Contractor's performance of Services. Upon completion of the scheduled Services or at the end of each day, whichever comes first, Contractor shall ensure the work area is in a clean safe condition. The City shall be the sole judge as to the adequacy of the cleanup.

14.2 Contractor shall follow all directions of City with regard to clean-up both during the course of, and upon completion of Services. If Contractor fails to clean up the work area within forty-eight hours (48) after demand by the City, City may charge Contractor for any costs of clean-up or other services required to adequately protect the City's electrical or other facilities or to restore work area to a safe condition. City may invoice Contractor or deduct costs from Contractor's invoice at City's sole discretion.

14.3 Contractor must provide work and traffic signage as required to warn pedestrians and vehicular traffic of work in progress. Contractor may be required to direct pedestrians and traffic around the work area. Contractor shall also be responsible for providing all equipment and personnel necessary to properly perform the traffic control measures, including but not limited to, flaggers, cones, reflectors, electronic signs, barricades, caution tape, temporary paving, or steel plates.

14.4 Contractor shall make all reasonable efforts to minimize obstructions and inconvenience to City's operations and others who may be impacted by Contractor's Services.

SECTION 15. CONTRACTOR'S EQUIPMENT, TOOLS, AND MATERIALS

15.1 All equipment, tools (including any specialty tooling), and materials required for the execution of the Services shall be provided by Contractor. City will not loan tools or equipment to Contractor. Neither Contractor nor its workers shall attempt to borrow tools or other materials from City personnel.

15.2 Tools and equipment shall be kept in proper operating condition and used only for the purpose for which they were designed. City reserves the right to suspend Services if improper tools or equipment are being used or operated.

15.3 Tools and equipment shall be safely stored overnight under lock and key. Loss of any tools or equipment shall be reported immediately to City.

Agreement with Rising Edge Technologies (California), LLC Page 24 of 66

15.4 All vehicles, equipment, and ladders shall be secured when not in use. Keys shall not be left in any vehicles or equipment when not in use.

15.5 City will not be responsible for the loss of tools, equipment, or materials.

SECTION 16. DISPOSAL OF WASTE & SCRAPS

16.1 All wastes generated or encountered in the performance of Services must be managed in accordance with all applicable local, State, and federal regulations and laws. Contractor is solely responsible for arranging and implementing the proper handling, management, storage, transport, and disposal of all wastes including any hazardous materials.

16.2 Contractor shall provide the City with a written report of all disposal of materials within twenty-four (24) hours of disposal unless a shorter timeline is required by local, state, and/or federal regulations.

16.3 Contractor shall recycle all material scraps, and credit the value to the City.

SECTION 17. SAFETY
17 .1 Safety must always be the top priority. Contractor shall take all necessary precautions for the safety of all persons at the work site. Contractor must erect and properly maintain at all times, as required by the conditions and progress of the Services, all necessary safeguards for the protection of all persons and the public including posting danger signs and warnings against known or unusual hazards.

17.2 Contractor shall maintain an effective Injury and Illness Prevention Program (IIPP) in writing pursuant to Section 3203, Title 8 of the California Code of Regulations (CCR). The written plan shall include specific instructions with regard to hazards unique to the employee's job assignment. Contractor shall submit a copy of their IIPP at City's request, and Contractor shall make it available on-site. 17 .3 Contractor shall schedule safety inspections as necessary and as may be requested by the City to identify and correct unsafe conditions and work practices.

The City reserves the right to accompany Contractor during these inspections. 17 .4 Contractor must comply with all site-specific safety requirements and procedures including but not limited to Lockout/Tagout (LOTO), Energy Isolation, Confined Space, Fall Protection, Chemical Safety, Hazardous Waste, and Personnel Protective Equipment (PPE).

17.5 Contractor's employees (including any subcontractors) shall use appropriate Personal Protective Equipment (PPE) and Fire Resistant (FR) clothing, as required. Any required PPE and FR clothing shall be provided at the expense of Contractor.

Agreement with Rising Edge Technologies (California), LLC Page 25 of 66 17 .6 Contractor must comply with SVP's clearance program as may be updated from time to time.

17.7 When requested by the City, Contractor shall provide an on-site Safety Manager/Supervisor to ensure compliance with all applicable Safety rules and regulations, perform daily audits and submit daily reports to the City that identify discrepancies or non-compliance, provide direction in regards to safety rules and regulations to Contractor Project Manager/On-Site Supervisor (as defined in Section 19) and Contractor employees.

SECTION 18. INJURY/PROPERTY DAMAGE
Contractor shall notify the City immediately in the event of an injury or property damage that occurs during the performance of Services. Contractor shall investigate the reported injury or damage upon request from City and provide City with regular updates including all accident reports until the investigation is resolved. City reserves the right to perform its own investigation. Should City choose to conduct its own investigation, Contractor shall assist as required.

SECTION 19. CONTRACTOR PERSONNEL

19.1 Project Manager/On-Site Supervisor
Contractor must designate one (1) Project Manager or On-Site Supervisor to communicate with the City during performance of Services. The Project Manager/On-Site Supervisor is the designated point of contact for the City to communicate tasks and receive feedback. The Project Manager/On-Site Supervisor must be capable of communicating effectively with City staff.

19.2 Staffing

19.2.1 Contractor shall be responsible for its employees' professional and technical competence and will select appropriate individuals who are qualified, certified, and/or licensed to perform the assigned task.

19.2.2 Contractor shall ensure its employees and any subcontractors supply proper identification when requested by the City.

19.2.3 Contractor shall inform City immediately of any change in key personnel assigned to this agreement. Contractor shall submit the resumes and other qualifications of the proposed replacement employee(s) to City for review and approval.

19.3 Employee Training
Agreement with Rising Edge Technologies (California), LLC Page 26 of 66

19.3.1 At Contractor's sole cost and expense, Contractor shall provide recurring, periodic (no less than annual) training to its employees (including subcontractors) appropriate to the duties and responsibilities of each employee.

19.3.2 It is essential that all employees be thoroughly trained and familiar with the equipment and procedures to be followed.

19.3.3 Training shall follow Contractor's standard policies and procedures and shall be in compliance with all applicable federal, state, and local laws, including but not limited to safety and injury prevention training requirements contained in the OSHA standards.

19.3.4 Contractor shall be familiar with SVP's operating standards. All employees are required to watch SVP's safety video once per calendar year or prior to the commencement of the Services.

19.3.5 At the City's request, Contractor shall submit copies of training records for its employees.

19.4 Standards of Conduct

19.4.1 Contractor shall be solely responsible for its employees while on or about the work site, including but not limited to, maintaining discipline, ensuring standards of conduct are adhered to, and enforcing safety policies, procedures, and orders. Contractor shall ensure that while on or about the work site, its employees do not:

19.4.1.1 Display a discourteous, abrupt, abrasive, or belligerent attitude.

19.4.1.2 Use any prescribed or over-the-counter medications which can potentially impair the employee's ability to perform the Services safely.

19.4.1.3 Present or identify themselves as employees of the City of Santa Clara.

19.4.1.4 Possess or use alcohol, narcotics, firearms, illegal drugs, intoxicants, or other restricted materials while on the premises.

19.4.2 In the event that a Contractor employee fails to meet these standards of conduct, Contractor shall immediately remove the employee and provide a replacement. Contractor shall determine appropriate disciplinary actions in accordance with its own policy, a copy of which may be requested by the City at any time.

Agreement with Rising Edge Technologies (California), LLC Page 27 of 66

19.4.3 In the event that a complaint is made against a Contractor employee, Contractor shall notify the City immediately and provide a written explanation detailing how the situation was resolved.

SECTION 20. E-BUILDER

20.1 When required by City, Contractor shall use e-Builder for submission of data and documents throughout the Term of this Agreement.

20.2 e-Builder is a web-based construction management application hosted by e­ Builder, Inc. For certain projects to be defined by the City, e-Builder shall be the primary means of project information submission and management or as otherwise agreed upon with the City.

20.3 The City will establish the Contractor's access to e-Builder by providing licenses to Contractor's personnel at City's cost. The Contractor's designated users will be required to set up their computers/systems to use e-Builder in accordance to the e-Builder User Training Guide. The City reserves the right to limit the licenses issued to Contractor in the future.

20.4 Contractor is required to obtain all necessary training to use the software. The City will provide one classroom training or a web-based seminar. A training session is 1 - 2 hours.

20.5 e-Builder is a web-based environment and therefore it is subject to the inherent speed and connectivity limitations of the Internet. Contractor is responsible for its own connectivity to the Internet. e-Builder's response time is dependent on the Contractor's equipment, including processor speed, Internet access speed, etc., and current traffic on the Internet. The City will not be liable for any delays associated with the usage of e-Builder including, but not limited to slow response time, downtime periods, connectivity problems, or loss of information. The Contractor shall ensure connectivity to the e-Builder system whether at the home office or job site. Under no circumstances will the usage of e-Builder be grounds for a time extension or cost adjustment to the Agreement.

20.6 Data entered in a collaborative mode (entered with the intent to share as determined by permissions and workflows within the e-Builder system) by the City and the Contractor will be jointly owned.

20.7 Contractor is responsible for managing, tracking, and documenting the Services to comply with the requirements of this Agreement. The City's acceptance via automated system notifications or audit logs extends only to the face value of the submitted documentation and does not constitute a validation of the Contractor's submitted information.

Agreement with Rising Edge Technologies (California), LLC Page 28 of 66

20.8 At the City's sole discretion, project documents may be processed and distributed digitally over the internet or may be required to be presented in hard copy format.

20.9 While regular email may still be used for communication, when requested by the City, e-Builder shall be used as much as possible in connection with all document and information management required in the performance of projects where City has directed the use of e-Builder. Contractor shall be responsible for scanning or otherwise converting to electronic format all project submittals and Contractor correspondence, drawings, sketches, etc., and uploading them to the e-Builder website and shall be responsible for the validity of the information placed in e­ Builder. The Contractor shall use the existing forms and processes in e-Builder to the maximum extent possible. If a required form does not exist in e-Builder, the Contractor shall include a form of its own or one provided by the City (if available) as an attachment to a submittal or process. Documents and information to be submitted electronically include, but are not limited to:

20.9.1 Correspondence

20.9.2 Meeting minutes

20.9.3 Product data, reports, certifications, etc. must be submitted in PDF. (If a sample can be scanned, it is requested that a scanned PDF copy be submitted with the sample).

20.9.4 Requests for Information (RFl's)

20.9.5 Submittals and shop drawings

20.9.6 Change order requests and documentation, including record copies of change orders, proposals, and modifications.

20.9. 7 Pay applications

20.9.8 "Official" correspondence (such as letters) including informal correspondence, such as email.

20.9.9 Pre-Task Plans (PTPs)

20.9.10 Daily construction reports and other daily reports including Contractor Quality Control (CQC) Reports

20.9.11 All official reports, such as commissioning reports

20.9.12 Notices and claims

20.9.13 Operations and maintenance manuals

20.9.14 All close-out documents, and
Agreement with Rising Edge Technologies (California), LLC Page 29 of 66

20.9.15 All testing results

20.10Archive Copies: When requested by City, Contractor shall keep an archive copy of all digital data created by Contractor, or submitted to Contractor via e-mail, or resident on the e-Builder for the duration of the Project. Such data shall be available to City, and authorities with the jurisdiction (including funding agencies or representatives) on demand.

20.11 Should the City replace e-Builder with a different project management tool, Contractor, and subcontractors shall be required to use the new project management tool selected by the City.

SECTION 21. TRANSPORTATION, SHIPPING, AND FREIGHT

21.1 Contractor shall be responsible for shipment and delivery of all required products, materials, and equipment to City. Contractor will pay all freight charges which may be reimbursed subject to the terms of Section 8 of Exhibit A and Section 2 of Exhibit B. All products, materials, and equipment shall be entirely at Contractor's risk from the time they are placed in the possession of the carrier for shipment to/from City until final acceptance by the City at the location set forth in the applicable Work Authorization or Purchase Order.

21.2 Contractor will pack and ship all products, materials, and equipment in accordance with good commercial practices.

21.3 Contractor shall ensure that the products, materials, and equipment are insured against "all risks" from the time the products, materials, and equipment are placed in the possession of the carrier for shipment to/from City until received by the City.

21.4 Contractor shall notify the City at least sixty (60) minutes prior to the arrival of any deliveries to the City. City will provide the Contractor with a contact name, phone number, and shipping location.

Agreement with Rising Edge Technologies (California), LLC Page 30 of 66 Appenmx A.l
~LICON Third Party Pole Contact
Construction Re uirements
ISSUING DIVISION: Electric Engineering
SVP SPONSOR: Kevin Keating, Manager
SECTION: Pole Line Construction
Table of Contents
Signed by MHir A:eattirt
Date Signed 26 !fa,, 2016
SHEET: Sheet 1 of 11
OH 0825
Scope of Standard ........................................................................................................................... 2 Purpose of Revision ................................................... ..................................................................... 2 References ............................................................ ........................................................................... 2 Rescissions ............................... ....................................................................................................... 2 Definition of Terms .......................................................... ............................................................... 3 Overview .................................................................... ......................................................... ............ 4 Route Design ......................... .................. ........................................................................................ 4 Cable Attachments .......................................................................................................................... 5 Span Guys ........................................................................ ............................................................... 7 Down Guys/ Anchors .............. ...................... .................................................................................. 8 Risers ............................................................................................................................................... 9 Equipment ....................................................................................................................................... 9 Signage .......................................................................................................................................... 10 Cross Arms ............................................................................... ..................................................... 11 Variance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Table of Figures
Figure 1: Fiber Placement on Pole .................................................................................................. 5 Figure 2: Location References on Cross Aims ............................................................................... 5 Figure 3: Cross Arm to Dead End Transition .................... ............................................................ 6 Figure 4: Example of Prohibited Span Guy Construction .............................................................. 7 Figure 5: Examples of Approved Span Guy Construction ............................................................. 7 Figure 6: Example of Riser Placement Locations ............................... .......................................... .. 9 Figure 7: Proper Brace Placement on a Cross Arm ...................................................................... 11 I Scope of Standard
This Document is intended to provide Third Party Applicants, who wish to attach to Silicon Valley Power's utility poles, guidelines on proper construction practices.

I Purpose of Revision
None, this is a new document that has not been previously issued by SVP Engineering.

I References
o National Electric Safety Code. David Marne. November 2011 o Rules for Overhead Electric Line Construction. General Order No. 95. Public Utilities Commission of the State of California. February 2014 o UG 1000, Installation of Underground Substructures by Developers, Silicon Valley Power, May 2014
I Rescissions
None, this is a new document that has not been previously issued by SVP Engineering.

By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 2 of 11
OH 0825
Silicon Valley Power

Page 32 of 66 ends

Rev.
0 !Definition of Terms
o City: City of Santa Clara or the City Council of the City of Santa Clara. o City Engineer: City Engineer of the City of Santa Clara. o Conductor: a material suitable for: (1) carrying electric current, usually in the form of a wire, cable or bus bar, or (2) transmitting light in the case of fiber optics. o Dead-End Pole: A utility pole that is at the end of a line of conductors. o Down Guy: A restraining method used to balance out the conductor tension acting on a utility pole, by transferring the tension to an anchor place in the ground. o Guy: a tension member (a solid wire or stranded wires) used to withstand an otherwise unbalanced force on a pole, cross arm, or other overhead line structure. o Primary Conductor: conductors that carry a voltage between 12000 and 44000 volts. o Secondary Conductor: conductors that operate between 100 and 600 volts. o Span guy: A guy wire strung between 2 poles.
o Silicon Valley Power (SVP): The Municipal Electric Utility of the City of Santa Clara. o Transmission: SVP electric system where the nominal system voltage is greater than 44,000V.
o Utility Pole: A wooden, or metal, pole that supports equipment and conductors used for electrical and communication utilities.
o Voltage (or Volts): the highest effective voltage between any two conductors of the circuit concerned
By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 3 of 11
OH 0825
Silicon Valley Power

Page 33 of 66 ends

Rev.
0 !Overview
The City of Santa Clara's Electric Depmiment, Silicon Valley Power, (SVP) owns and maintains existing utility poles within the City limits. Other entities may wish to utilize these assets for their own communication networks. In order to maintain consistency, this document has been created with the purpose of setting standard construction and design practices that must be followed when attaching to SVP's assets.

California's Public Utilities Commission's General Order 95 shall be used as the basis for all pole attachment design. If any conflicts arise between this standard and G.O.95, the most stringent standard shall apply.
!Route Design
• Communication entities shall not attach to any pole directly supporting a SVP transmission line.
• When attaching to SVP utility poles, the communication lines may not bypass any pole following the same route as SVP' s pole lines.
• All Communication lines must maintain at least a 1 foot separation from any streetlight or traffic signal.
• Communication lines may not cross property lines, without the proper easements, or access approval from the property owner.
• Communication lines, or their support strands and overhead guys, may not pass over the center of traffic intersections.
• Street Crossings shall be as close to perpendicular to the street as possible.

By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 4 of 11
OH 0825
Silicon Valley Power

Page 34 of 66 ends

Rev.
0 I Cable Attachments
• Where no cross arms exist, all cable attachments shall be on the same side of the pole As shown in Figure 1.
• Any lines due to be over-lashed shall be checked for dead, or inactive, lines. Any dead, or inactive, conductors shall be removed.
• Cable replacements must be "delashed - relashed" to remove old cable. • Minimum vertical separation between communication lines on the same pole without a cross arm is 1 foot.
b
C
b
p
p
p
Figure 1: Fiber Placement on Pole
• When a Cross arm is not present Communication lines should be placed in the following order from top to bottom on SVP poles: SVP Fiber, Other Fiber, Coaxial lines, Telco Lines. o Cross arms without SVP fiber present, shall be filled out in the following order:

Bottom Inside, Top Inside, Bottom Outside, and finally Top outside Position, as shown in figure 2. Always place the heavier line as close to the pole as possible When SVP fiber is present it is always placed on the top outside section of the aim.
~
~
Top Inside
Po~on
Top Outside
Position
0 I u. u Bottom Inside Bottom Outside
Position Position
Figure 2: Location References on
Cross Arms
By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 5 of 11
OH 0825
Silicon Valley Power

Page 35 of 66 ends

Rev.
0 o When cross arms are used separation requirements from secondary lines increase to 54 inches instead of the normal 48" that is allowed with a guard arm. o Communication arms shall not be used for dead end construction. o When a cross arm leads directly to dead end construction, more than three lines may be directly attached to the pole. The cross arm positions should transfer as shown in figure 3 with no contact between the lines:
~
©
('i)
I
®
)> @
©
.....__--..

Figure 3: Cross Arm to Dead End Transition
By: Joseph Bruzzone, Skip Baydo
Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 6 of 11 Approved: 05/26/2016
Silicon Valley Power
OH 0825

Page 36 ends

Rev.
0 !Span Guys
• An Anchor must always be placed where guying is required at dead ends. Overhead guys may be used to transfer the tension from an area where an anchor may not be set to an area where setting an anchor is possible or to allow two spans to balance their loads out where joining the conductors or fiber is impractical. However, it is not permissible to use overhead guys in place of an anchor by using poles to balance the load out.

Figure 4: Example of Prohibited Span Guy Construction
'------I-
Figure 5: Examples of Approved Span Guy Construction
By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 7 of 11
OH 0825
Silicon Valley Power
Pa!:!e 37 of 66
Rev.
0 !Down Guys/ Anchors
• Anchors to be placed in the City Right of way, will require an encroachment permit be issued by the Public Works Department
• Clearances between applicants' anchors and other SVP anchors, or SVP underground facilities, is governed by SVP Standard document UG 1250 • Down Guys must fit within the existing anchor eye attached to the anchor. (1 eye, 2 eye etc.)
• All Attachers are required to have their own down guy, SVP anchors may be attached to as part of the construction permit. However, Attacher must obtain permission to attach to any other 3rd party's anchors.
• A max of three down guys may be attached to an anchor, provided that the load is not greater than the rating of the anchor.
• When an anchor is installed, a minimum l" diameter, 8' long anchor rod must be used. • All Anchors must be installed according to the manufacturer's specifications. • Insulators and guy guards are required on all down guys. • Down guys may only be joined together below the insulators. • Any pole that has a pull on pole of 5' or greater (5 degree angle) shall require an anchor. • All anchors are to be viewed and approved by an SVP inspector prior to installation.

By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 8 of 11
OH 0825
Silicon Valley Power
Rev.
0 !Risers
• Risers should be placed within as close proximity to each other as possible • Risers must be placed within the same 180 degree radius.

I Equipment
Figure 6: Example of Riser
Placement Locations
• Equipment must be mounted with its lowest point at least 8 feet above ground. • No electric revenue meters and service disconnects may be mounted on SVP Poles. • No cellular antennas may be mounted on SVP wooden Utility Poles. • Equipment shall have at least 2 attachment points.
• Equipment must maintain a clearance of at least 1 foot from communication lines and 6 feet from secondary power conductors.
• Equipment shall be no bigger than 4'x 4'x 1' and 100 lbs. Any equipment that exceeds this size shall require a variance.

Equipment not allowed on SVP Assets
• Eyebolts
• Spacer blocks
By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 9 of 11
OH 0825
Silicon Valley Power

Page 39 ends

Rev.
0 ISignage
• Any equipment emitting a RF frequency must have signage posted as required by SVP standard SD 1275 "RF Unit Clearances"
• Radios that are attached to a communication support line shall be labeled on the unit itself and on the nearest pole using the methodology laid out in SD 1275. • Any Equipment that has an independent backup power source, such as batteries, shall have a warning sign posted, with a 24 hour contact number that a worker may call to make the item safe.
• All equipment shall be equipped with a visible indicator, such as an indicator light that indicates if equipment is energized, or not energized.
• All conductors and equipment shall be clearly labeled as to the owner. • Non-SVP owned Poles must be labeled according to SVP Standard OH 1615 " Outside Agency Utility Pole Labeling"
By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 10 of 11
OH 0825
Silicon Valley Power
P::u!e 40 of 66
Rev.
0 I Cross Arms
• Any pole that has 4 or more communication lines shall require a cross arm be installed.

Cross arms can be acquired from SVP at no charge. SVP will provide cross arms, braces, and pole gains. Ownership responsibilities of the cross arms assembly will rest with SVP • Double cross arms are required at the following locations:
o Spans longer than 250'.
o Major street and high way crossings.
o Comer poles that require a down guy,
• The only cross arms allowed on SVP poles are those provided by SVP • Braces shall be installed in the downward position, as shown in Figure 7.

Figure 7: Proper Brace Placement on a Cross Arm
!Variance
A variance to these conditions may be granted by the SVP Engineer or SVP Inspector assigned to a particular Job. There is no Guarantee that a variance will be granted.

By: Joseph Bruzzone, Skip Baydo
Approved: 05/26/2016 Third Party Pole Contact
Standard
Drawn By: Joseph Bruzzone, Skip Baydo
SHEET 11 of 11
OH 0825
Silicon Valley Power
Rev.
0 DAAWN BY:
0 (.u
ITEM
1 2
3 4
5 6
7 8
AppendixA2
ASSOC. UNITS F40 - F42
(8)
10' MIN,
1YPICAL ·.DOWN ·GUY & ANCHOR
ASSOC. UNIT F40 & F41-. ---

USE EXISTING ANCHOR

IF AVAILABLE

TYPICAL SIDEWALK GUY
A~SOC. UNIT F42

AUXILIARY EYE
ASSOC. UNIT -
F40

EXISTING
ANCHOR
MATERIAL LIST:

Q1Y DESCRIPTION
AS 1 / 4'' GALVANIZED STRAND 7 STRAND EXTRA HIGH STRENGTH (EHS)

REQUIRED
2 PRE-FORMED GUY-GRIP CAT. # GDE-1104 OR EQUIVALENT.
1 GUY GUARD FULL ROUND 8
1 LENGTH
1 SET SIDEWALK GUY ARM FITTINGS
1 GALV. .STEEL PIPE LENGTH & . SIZE AS REQUIRED
1 ANCHOR, SCREW, TWIN HELIX,- 8", 8000 FT. LB. WITH 1 1 /2" SQUARE HUB. • DIXIE CAT. # D-284-8 WITH 3/4" X 7' DIAMETER ANCHOR ROD AND lWINEYE EYE- NUT, DIXIE CAT. IJ D-7-5-D OR APPROVED EQUAL.

ANCHOR NOT REQUIRED FOR LOCATIONS WITH EXISTING ANCHOR ROD.

As reauired AUXILIARY EYE SIZED TO EXISTING ANCHOR

INSULATOR
TYPICAL· GUY AN·CHOR ASSEMBLIES
NOT .TO SCALE;
c3; ____________________________ --r---~-----,,--___;,-----1 ~~ 1111.Ef • R£V. D.A.Tf: :

Jilicon_·:~:

N~lley:-.
ni\TI~e,.,,.: r-v .,.I ;.L~ !-'•
-TYPICA_L ... GUY·
A;NCHOR. ASSEMBLIES
tHIG. NO. •
SHT, •.

DIR.

E}lG,
Of'
F40 - F42

Page 42 ends

HANDHOLE - NOT PART

OF THIS UNIT
Tm.£:~ .
n·~.,s,
· 1.1 ... a,uey:· ; ..
ower:: .. •
• Cff'(.Of'.IWff'A'CUAl.;.,\, .

OOAVIH -BY: :-
PEI·····
1 - JACKMOON OR::----___
EQUAL SIMPLEX. DUCT --------­
PLUG
ASSOC. UNIT F47
~ CONDUIT
. ~ SUPPORTS OR
1 - 4" GIP RUN TO ---------=~~ STRAPS
WITHIN 30" OF DEADEND ~
1 - 4" GIP TO

PVC COUPLER
--··2-' MINIMUM
FJBER OPTIC RISER.

NOT TO SCALE,
FIBER· OPT1·c RISER
TERMINAL RELIABLE #
F604975 OR EQUAL
LOCATE WIRE # 10

AWG INSULATED
1-4" PVC
36" RAO.,
90' BEND
1 REV. ~re····
DWG.rl,1().-···
· OF
DIR. •
. • EHG ...

F47 _:.

Page 43 of 66 ends

/
1 l j.

STORAGE RACk

MOUNTING BRACKETS

ARMOR RODS
ASSOC. UNIT F48 - F49
- ,
• tl-.
,l;lt .,,
SINGLE CAB~
STORAGE RAt~ \

TH SIDES OF POLE)
-----

CABLE PROTECTION

BRACK-ET
FIBER: ·oprrc I SLACK STORAGE / STRAND· OR ·::-cABEE_-MOUNT[D NOT TO , SCf.'iLE
llll.£:,;_
n~--
a,; 11.. ,f:sv.•
"-·we1:~: ..

C:tTYO,-~Ci.tAM"'-' ·'
' ~ .B'(: '
FI-BE.R - OPTIC SLACK
STORAGE .. / STRA_ND -
o·R:··.- CAB-LE .. ·Mo-UNTED
SHT:· ..

DIR. 'l

00. F48 - F49

Page 44 of 66 ends

OF
!.
! .

TYPICAL 2
PLACES
~ B'f:'
u
PART NO. QUANTITY
0 2
0 2
0 4
0 2
® PS REQ'D
0 -. 1
0 © 2
ASSOC. UNIT FSO - FSI

DESCRIPTION
BOLT,. MACHINE, 5/8" X 12H
NUT, HEX, 5/8"
n
u
WASHER, SQUARE, CURVED, 3"X3"X1/4"X11/16" HOLE
LOCKNUT, MF, 5/8" DIAMETER
. .
1/4" (EHS) GUY STRAND
DEAD END, GUY GRIP, PREFORMED 6M
DEAD Et:,ID, AUTOMATIC, '6M, SHORT BAIL
THIMBLE EYE NUT, 5/8"
TYP-ICAL•, ... 6M. MESSENGER ASSEMBLY·
NOT ·ro SCALE
•• REV. DATE: .. • 03/05/04 SHT ••
, OF·:"
OWG. 00.

DIR. ..

ENG.

FSO - FSI
I

Page 45 of 66 ends

l
:
. :
~UY ATfACHMENT
FOR B!SECTOR GUY
CnYat~ACUI\IL.•
ORAWN •B'f:

PEI
ASSOC·. UNJT . F.52 ·_ F53. : • • :

SECTION A-A
-MATERlAL LIST ..

ITEM _NO. OL!ANTJTY DESQRIPTlON
1 1 F!BERUGN DiELECTRIC SUPPORT
2 1 • OVAi:.. EYE BOLT, 5/8", GALVANIZED STEEL,

WITH SQUARE NUT, LENGTH AS REQUIRED
3 1 SQUARE :WASHER(3" PlAT
4 .1 LOCKNUT, 5/8"
D-0UBLE DEADEND POLE' DETAtL 40~ TO 5·0·
• USE ,FOR ·LINE· -ANGl:£S OF 40' TO 60' • •
NOT·TO SCAl;.E, . •
F52 - F53
..... - -
• Page 46 of 66-- .-
ASSOC. UNIT F52 - F53
• /FIBER CABCE

DOWN GUY

SECTION A-A

MATERIAL LIST
ITEM NO. QUANTITY DESCRIPTION
. 1 . , FIBERLIGN DIELECTRIC SUPPORT
' • . ...
2 1 OVAL EYE' SOLT, 5/8", .GALVANIZED .STEEL.
wIrn SQUARE NUT, l;-ENGTH /;S .REQUIRED.
3· 1 ._EYE: •• ANGLE THIMBLEYE, POR 5/8" BOLT,
· .. CliAt:IG~ #,Ol.QO,. ~OSLYN #J65'00; OR
APPROVED .EQUAL •
4 1 SQUARE WASHER, 3" FLAT
5 .. 1 . LOCKNUT, 5/8" •
60--90- DOUBLE DEAD-END
USE FQR LINE ANGLES GREATER--n-LA.N 6CT
NOT TO SCALE· .
. ~.,.._, • lffi£:'
60° ro· 90° ··bOUBLE
D[AD·-END
. n:
.~Rey· ·wer:·~~-• .
,I\M(TA. C, .MA -, .

PEI
..

SKT. '
_ .. OF -
DIR.

ENG.

F52 - F53

Page 47 ends

1ll1.£!
n=:.: ...
-~lief· ower:

CfN 0, &AHTM,.MA ·,,
DRAWH Erl'.:

PEI
ASSOC. UNIT "F59 - F60

FIBERLIGN
/ DIELECTRIC SUPPORT
1 /2" THRU BOLT

WITH NUT AND

LOCK NUT

BRACE - CROSS ARM
2B"LG.x1 1/4"x1/4"
WITH 7 /16" AND 9/16"

DIA HOLES HOT DIP PED
GALV. STEEL.

MATERIAL· LIST

QUANTITY DESCRIPTION
MACHINE BOLT, 5/8", GALVANIZED STEEL,

WITH SQUARE NUT, LENGTH PS REQUIRED
SQUARE WASHER, 3" FLAT
1 • •• LOCKNUT, 5/B"
TYPICAL· ALLEY ARM MOUNTING
I NOT TO 'SCALE •

TYPICAL ALLEY

ARM MOUNTING
REV. DATE: -'
[H{G.·-NO.

SHT ••
OlR.

ENG.

OF·
F59 ---F60

Page 48 of 66 ends

EXHIBIT B

SCHEDULE OF FEES AND PAYMENT PROVISIONS
SECTION 1. MAXIMUM COMPENSATION

1.1 The maximum compensation payable to Contractor during the Term shall not exceed the amount in Section 6 (Compensation and Payment) of this Agreement.

1.2 The City does not guarantee any minimum compensation under this Agreement.

SECTION 2. RATES

2.1 Contractor shall submit Proposals and invoice all Services at the rates listed in Table B1 (Labor Rates), Table B2 (Daily Crew Rates), and Table B3 (Equipment Rates) attached and incorporated by reference.

2.2 Rates listed in Appendix B1 (Rates) are fully burdened and will remain fixed for the first two (2) years of the Agreement.

2.3 Rate Increase. After the initial two (2) years of the Agreement, rates may be negotiated no more than once annually. Contractor shall notify the City ninety (90) days in advance of any proposed rate increase. Any rate increases are subject to approval by the City and must be substantiated by the Contractor to the satisfaction of the City. All rate adjustments must be approved by the City through an amendment to this Agreement. References to alternate rates in quotes or Proposals that have not been separately authorized pursuant to this section are not approved.

2.4 Reimbursable Expenses. Any and all reimbursable expenses related to each Work Authorization or Purchase Order shall be described in Contractor's Proposal as set forth in Section 8 of Exhibit A and accounted for in the total cost for each Proposal, Work Authorization, and Purchase Order. Expenses shall be reimbursable only to the extent that (1) Contractor submits sufficient documentation to City that the expenses were directly incurred in providing the required Services, (2) Contractor demonstrates that such expenses aren't included in the hourly rate where applicable, (3) such expenses were approved in advance pursuant to Section 8 of Exhibit A, (4) Contractor submits receipts, invoices, or other supporting documentation demonstrating that such reimbursable costs were incurred. Any reimbursement to the Contractor is limited to the expenses set forth below in the Reimbursable Expense Schedule.

Agreement with Rising Edge Technologies (California), LLC Page 49 of 66 Reimbursable Expense Schedule Mark Up

1. The cost of mailing, shipping and/or delivery of any No Markup documents or materials.

2. The cost of photographing, printing, reproducing No Markup and/or copying any documents or materials.

3. Charges for outside parts and services (including Not to exceed 10% subcontractor fees, parts, equipment, rental
equipment, materials, and facilities not furnished
directly by Contractor).

4. Other reimbursable expenses with prior written No Markup approval from the City.

5. Except for the vehicles listed in Appendix B 1 and No Markup rental cars, Contractor may invoice allowable mileage
at the prevailing IRS rate per mile. (Rental cars are
reimbursed at actual cost only. No mileage is
applicable to rental cars or to the vehicles listed in
Table B-3).

6. Unless approved in writing (e-mail acceptable) in No Markup advance, meals, lodging, and related per diem shall
not exceed the rates outlined by United States
General Services Administration (GSA).
htt12s://www.gsa.gov/travel-resources. Airfare or
rental car, where applicable shall be at economy
rates.

SECTION 3. PAYMENT PROVISIONS

3.1 Time and Materials. For Services authorized to be paid on a time and material basis, Contractor shall provide an invoice to the City on a monthly basis for Services completed in the preceding month, pursuant to the rates listed in Table B1 (Labor Rates), Table B2 (Daily Crew Rates), and Table B3 (Equipment Rates) in Appendix B1 and in accordance with the Work Authorization. The invoice must include the following information:

3.1.1 Invoice Number, Purchase Order Number, and Invoice Period.

3.1.2 Current amount due with a time and materials breakdown: titles, hours, hourly rates, and any City approved reimbursable expenses itemized with supporting documentation.

3.1.3 Each invoice shall provide sufficient detail for City to verify that the rates listed in Appendix B1 are charged. Additionally, invoices shall include Agreement with Rising Edge Technologies (California), LLC Page 50 of 66 sufficient detail to allow for accurate comparison with certified payroll submittals.

3.2 Fixed Price. For Services authorized to be paid on a fixed price or lump sum basis, Contractor shall provide an invoice to the City in accordance with the Work Authorization and based on either (a) the percentage of Services completed during the previous month or (b) a lump sum amount upon the completion of deliverable(s), as specified in the Purchase Order. Invoices must include the following information:

3.2.1 Invoice Number, Purchase Order Number, and Invoice Period.

3.2.2 Detailed information on the Services performed on each deliverable or task completed on each project, as applicable.

3.2.3 Contractor shall not invoice labor costs subject to prevailing wages in advance of performing the applicable Services.

3.2.4 With regard to milestone payments, Contractor shall invoice each milestone payment in full. Contractor shall not separate milestone payments into multiple invoices.

3.3 Pre-Payment. City shall not be required to pay a deposit or any other form of pre­ payment prior to Contractor beginning the Services.

3.4 Payment Limited to Satisfactory Work. Contractor is not entitled to any payments until the City concludes that the Services and/or any furnished deliverables have been satisfactorily performed.

3.5 Recalculation. The City may recalculate and pay invoices based on the rates established in this Agreement.

3.6 Certified Payroll. When applicable, Contractor must submit all necessary certified payrolls through LCP Tracker in advance of its request for payment. These submittals shall comply with the requirements set forth in Exhibit D and are subject to verification by the City.

3.7 Payment. If there are no discrepancies or deficiencies in the submitted invoice and Contractor has submitted all required certified payroll, City shall process the invoice for payment.

3.8 Confidential. Invoices are not confidential even if marked confidential when submitted.

Agreement with Rising Edge Technologies (California), LLC Page 51 of 66 SECTION 1. RA TES
APPENDIX 81 TO EXHIBIT B
RATES
Contractor shall charge, and the City shall pay for actual services rendered and authorized according to the process outlined in Section 8 of Exhibit A. The rates applicable for the Services are listed below in Tables 81 through 83.

In cases where Services are required but not listed below, Contractor shall submit rates for approval by the City in advance, in writing before performing the services. For avoidance of doubt, any changes to the rates in Tables 81 through 83. must be authorized in accordance with Section 2.3 of Exhibit 8. Rate changes are not permitted as part of a Work Authorization process.

TABLE 81 - LABOR RATES
Overtime and
Straight Time Double Time
Labor Classifications Daily Rates Hourly Rate Hourly Rate Equipment Operator $880.00 $110.00 $195.00
Truck Driver $880.00 $110.00 $195.00
Mechanic $872.00 $109.00 $193.00
Laborer $720.00 $90.00 $155.00
Flagger $720.00 $90.00 $155.00
Foreman $1,208.00 $151.00 $273.00
Journeyman Lineman $1,112.00 $139.00 $251.00
Apprentice Lineman $872.00 $109.00 $193.00
General Foreman $1,304.00 $163.00 $296.00
Fabricator Tech $808.00 $101.00 $181.00
Fabricator Tech Trainee $760.00 $95.00 $169.00
Welder $1,096.00 $137.00 $250.00
TABLE B2 - DAILY CREW RATES
Overtime and Double
Crew Daily Crew Rate Time Hourly Rate
2-Person Crew for Substructure $5,452.00 $550.00
Services
4-Person Crew for Substructure $8,720.00 $800.00
Services
3-Person Crew for Aerial $5,656.00 $1,100.00
Services
Agreement with Rising Edge Technologies (California), LLC Page 52 of 66 TABLE 83 - EQUIPMENT RATES
Equipment Daily Rates Hourly Rates
Trencher - Ride-On 42 horsepower $474.00 $47.00
(HP) minimum
Backhoe - 70 HP minimum $515.00 $51.00
Loader - 39 HP minimum $468.00 $47.00
Truck - Utility with Tools $259.00 $26.00
Truck - 6 Wheel Dump $225.00 $23.00
Truck - 10 Wheel Dump $225.00 $23.00
Truck - 1 Ton Pickup $296.00 $30.00
Truck - Boom, (T-40C or equivalent) $686.00 $69.00
with Tools - 45-foot reach minimum
Truck - Bucket with 28-foot reach $619.00 $62.00
minimum
Truck - Digger Derrick with Tools $567.00 $57.00
Trailer - 500 Gallon Water Trailer $150.00 $15.00
Truck or Trailer - 800 Gallon Vacuum $650.00 $65.00
Trailer - Pole and Pipe $134.00 $13.00
Trailer - Reel (all sizes) $134.00 $13.00
Tractor & Low Boy $780.00 $78.00
Vibrating Tamper - 100 lb. $40.00 $4.00
Vibratory Roller - 32" Smooth $305.00 $31.00
Hammer, Hydro $100.00 $10.00
Air Compressor $365.00 $36.00
Hydro Vac, 10 to 13 yards $650.00 $65.00
Rodder $50.00 $5.00
Compactor - 18" Diesel Plate $237.00 $24.00
Mini Excavator 20 HP Minimum $282.00 $28.00
Arrow Board $125.00 $13.00
Set of Barricades Emergency/Warning $225.00 $23.00
Flasher (each)
Manhole Package (manhole guard, $125.00 $13.00
Blower w/ hose, pump, gas tester)
Parts
Parts manufactured by Contractor shall be at price authorized in the Work Authorization. Parts from the original equipment manufacturer shall be at Contractor's actual cost plus a 10% markup. Where a markup is applied, Contractor shall provide receipts or invoices pursuant to Section 2.4 of Exhibit B.

SECTION 2. DEFINITIONS
The following definitions apply to the rates listed in Tables B1through B3:

Agreement with Rising Edge Technologies (California), LLC Page 53 of 66

2.1 "Daily Rate"

2.1.1 For Labor: Daily Rate applies to the first eight (8) hours worked each day Monday through Friday. Hours worked in excess of eight (8) hours each day from Monday through Friday will be billed at the overtime and double time hourly rates as defined below.

2.1.2 For Equipment: Daily Rate applies to a full calendar day.

2.2 "Straight Time" means the first eight (8) hours worked each day Monday through Friday, excluding U.S. Federal Holidays.

2.3 "Overtime" means the:

2.3.1 hours worked in excess of eight (8) hours each day, from Monday through Friday; or

2.3.2 first eight (8) hours worked on Saturdays.

2.4 "Double Time" means the:

2.4.1 hours worked in excess of twelve (12) hours per day Monday through Friday; or

2.4.2 hours worked in excess of eight (8) hours on Saturdays; or

2.4.3 hours worked during U.S. Federal Holidays; or

2.4.4 hours worked on Sundays.

2.5 "On-Site Minimum Hours":

2.5.1 Four (4) hours minimum for classifications in Table B1.

SECTION 3. CREW DAILY RATE REQUIREMENTS

3.1 "Crew Daily Rates" includes:

3.1.1 Labor and equipment listed in this Section;

3.1.2 Eight (8) hours of straight-time labor rates, equipment, tools, vehicles, fuel, maintenance, power, connections, and consumables needed to perform the Services; and

3.1.3 All vehicles and equipment are to be operated by a skilled and trained representative of the Contractor.

Agreement with Rising Edge Technologies (California), LLC Page 54 of 66

3.1.4 The City will supply substructure and aerial materials (e.g., conduit, boxes, and fiber-optic cables).

3.2 "Two (2)-Person Crew for Substructure Services" includes:

3.2.1 Labor: a) One (1) Foreman with Utility Truck (Underground); and b) One ( 1) Laborer; and

3.2.2 Equipment: a) One (1) utility truck with air compressor and tools; b) One (1) mini excavator 20 HP minimum; c) One (1) loader 39 HP minimum; d) One (1) small reel trailer; e) Concrete and asphalt tools; f) One (1) vibrating tamper - 100 lb.; g) One (1) set of barricades; h) One (1) dump trailer; and i) One (1) compactor - 18" diesel plate.

3.3 "Four (4)-Person Crew for Substructure Services" includes:

3.3.1 Labor: a) One (1) Foreman with Utility Truck (Underground); b) One (1) Laborer; c) One (1) Equipment Operator; and d) One (1) Truck Driver; and

3.3.2 Equipment: a) One (1) utility truck with air compressor and tools; b) One (1) mini excavator 20 HP minimum; c) One (1) loader 39 HP minimum; d) One (1) small reel trailer; e) Concrete and asphalt tools; f) One (1) vibrating tamper-100 lb.; g) One (1) set of barricades; h) One (1) dump trailer; i) One (1) compactor - 18" diesel plate; j) One (1) ton pickup truck; k) One (1) 6 wheel dump truck; I) One (1) pipe trailer; m) One (1) 32" vibratory roller; and m) One (1) arrow board.

3.4 "Three (3)-Person Crew for Aerial Services" includes:

3.4.1 Labor: a) One (1) Foreman; b) One (1) Journeyman lineman; and c) One (1) Apprentice Lineman; and

3.4.2 Equipment: a) One (1) aerial truck with tools with a 28-foot reach minimum; b) One (1) ton pickup truck; and c) One (1) small reel trailer.

Agreement with Rising Edge Technologies (California), LLC Page 55 of 66

EXHIBITC

INSURANCE REQUIREMENTS
Without limiting the Contractor's indemnification of the City, and prior to commencing any of the Services required under this Agreement, the Contractor shall provide and maintain in full force and effect, at its sole cost and expense, the following insurance policies with at least the indicated coverages, provisions and endorsements throughout the Term:

A. COMMERCIAL GENERAL LIABILITY INSURANCE

1. Commercial General Liability Insurance policy which provides coverage at least as broad as Insurance Services Office form CG 00 01. Policy limits are subject to review, but shall in no event be less than, the following:
$5,000,000 Each occurrence
$5,000,000 General aggregate
$5,000,000 Products/Completed Operations aggregate
$5,000,000 Personal Injury

2. Exact structure and layering of the coverage shall be left to the discretion of Contractor; however, any excess or umbrella policies used to meet the required limits shall be at least as broad as the underlying coverage and shall otherwise follow form.

3. The following provisions shall apply to the Commercial Liability policy as well as any umbrella policy maintained by the Contractor to comply with the insurance requirements of this Agreement:
a. Coverage shall be on a "pay on behalf' basis with defense costs payable in addition to policy limits;
b. There shall be no cross liability exclusion which precludes coverage for claims or suits by one insured against another; and c. Coverage shall apply separately to each insured against whom a claim is made or a suit is brought, except with respect to the limits of liability.

B. BUSINESS AUTOMOBILE LIABILITY INSURANCE
Business automobile liability insurance policy which provides coverage at least as broad as ISO form CA 00 01 with policy limits a minimum limit of not less than one million dollars ($1,000,000) each accident using, or providing coverage at least as broad as, Insurance Services Office form CA 00 01. Liability coverage shall apply to all owned, non-owned and hired autos.

Agreement with Rising Edge Technologies (California), LLC Page 56 of 66 C. WORKERS' COMPENSATION

1. Workers' Compensation Insurance Policy as required by statute and employer's liability with limits of at least one million dollars ($1,000,000) policy limit Bodily Injury by disease, one million dollars ($1,000,000) each accidenUBodily Injury and one million dollars ($1,000,000) each employee Bodily Injury by disease.

2. The indemnification and hold harmless obligations of Contractor included in this Agreement shall not be limited in any way by any limitation on the amount or type of damage, compensation or benefit payable by or for Contractor or any subcontractor under any Workers' Compensation Act(s), Disability Benefits Act(s) or other employee benefits act(s).

3. This policy must include a Waiver of Subrogation in favor of the City of Santa Clara, its City Council, commissions, officers, employees, volunteers and agents.

D. PROFESSIONAL LIABILITY INSURANCE
If Contractor's scope of services includes design, including engineered plans or technical specifications, Contractor shall maintain professional liability insurance appropriate to the Contractor's profession, with limits no less than $2,000,000 per claim and aggregate. Any policy inception date, continuity date, and/or retroactive date must be before the effective date of this Agreement and Contractor agrees to maintain continuous coverage for a period no less than three (3) years after completion of the services provided under this Agreement, including Work Authorizations.

E. COMPLIANCE WITH REQUIREMENTS
All of the following clauses and/or endorsements, or similar provisions, must be part of each commercial general liability policy, and each umbrella or excess policy.

1. Additional Insureds. City of Santa Clara, its City Council, commissions, officers, employees, volunteers and agents are hereby added as additional insureds in respect to liability arising out of Contractor's work for City, using Insurance Services Office (ISO) Endorsement CG 20 10 11 85 or the combination of CG 20 10 03 97 and CG 20 37 10 01, or its equivalent.

2. Primary and non-contributing. Each insurance policy provided by Contractor shall contain language or be endorsed to contain wording making it primary insurance as respects to, and not requiring contribution from, any other insurance which the Indemnities may possess, including any self-insurance or self-insured retention they may have. Any other Agreement with Rising Edge Technologies (California), LLC Page 57 of 66 insurance Indemnities may possess shall be considered excess insurance only and shall not be called upon to contribute with Contractor's insurance.

3. Cancellation.

4. a. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided due to non-payment of premiums shall be effective until written notice has been given to City at least ten (10) days prior to the effective date of such modification or cancellation. In the event of non-renewal, written notice shall be given at least ten (10) days prior to the effective date of non-renewal.
b. Each insurance policy shall contain language or be endorsed to reflect that no cancellation or modification of the coverage provided for any cause save and except non-payment of premiums shall be effective until written notice has been given to City at least thirty (30) days prior to the effective date of such modification or cancellation. In the event of non-renewal, written notice shall be given at least thirty (30) days prior to the effective date of non­ renewal.

Other Endorsements. Other endorsements may be required for policies other than the commercial general liability policy if specified in the description of required insurance set forth in Sections A through D of this Exhibit C, above.

F. ADDITIONAL INSURANCE RELATED PROVISIONS
Contractor and City agree as follows:

1. Contractor agrees to ensure that subcontractors, and any other party involved with the Services who is brought onto or involved in the performance of the Services by Contractor, provide the same minimum insurance coverage required of Contractor, except as with respect to limits. Contractor agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this Agreement. Contractor agrees that upon request by City, all agreements with, and insurance compliance documents provided by, such subcontractors and others engaged in the project will be submitted to City for review.

2. Contractor agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contractor for the cost of additional insurance coverage required by this Agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of Agreement with Rising Edge Technologies (California), LLC Page 58 of 66 complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto.

3. The City reserves the right to withhold payments from the Contractor in the event of material noncompliance with the insurance requirements set forth in this Agreement.

G. EVIDENCE OF COVERAGE
Prior to commencement of any Services under this Agreement, Contractor, and each and every subcontractor ( of every tier) shall, at its sole cost and expense, provide and maintain not less than the minimum insurance coverage with the endorsements and deductibles indicated in this Agreement. Such insurance coverage shall be maintained with insurers, and under forms of policies, satisfactory to City and as described in this Agreement. Contractor shall file with the City all certificates and endorsements for the required insurance policies for City's approval as to adequacy of the insurance protection.

H. EVIDENCE OF COMPLIANCE
Contractor or its insurance broker shall provide the required proof of insurance compliance, consisting of Insurance Services Office (ISO) endorsement forms or their equivalent and the ACORD form 25-S certificate of insurance (or its equivalent), evidencing all required coverage shall be delivered to City, or its representative as set forth below, at or prior to execution of this Agreement.

Upon City's request, Contractor shall submit to City copies of the actual insurance policies or renewals or replacements. Unless otherwise required by the terms of this Agreement, all certificates, endorsements, coverage verifications and other items required to be delivered to City pursuant to this Agreement shall be mailed to:

EBIX Inc.

City of Santa Clara Electric Department
P.O. Box 100085 - S2 or
Duluth, GA 30096
Telephone number: 951-766-2280
Fax number: 770-325-0409
Email address: [email protected]
I. QUALIFYING INSURERS
1 Ebix Way
John's Creek, GA 30097
All of the insurance companies providing insurance for Contractor shall have, and provide written proof of, an A. M. Best rating of at least A minus 6 (A- VI) or shall be an insurance company of equal financial stability that is approved by the City or its insurance compliance representatives.

Agreement with Rising Edge Technologies (California), LLC Page 59 of 66

EXHIBIT D

LABOR COMPLIANCE EXHIBIT
This Agreement is subject to the requirements of California Labor Code section 1720 et seq. requiring the payment of prevailing wages, the training of apprentices, and compliance with other applicable requirements.

A. Prevailing Wage Requirements

1. Contractor shall be obligated to pay not less than the General Prevailing Wage Rate, which can be found at www.dir.ca.gov and are on file with the City Clerk's office, which shall be available to any interested party upon request. Contractor is also required to have a copy of the applicable wage determination posted and/or available at each job site.

2. Specifically, contractors are reminded of the need for compliance with Labor Code Section 177 4-1775 (the payment of prevailing wages and documentation of such), Section 1776 (the keeping and submission of accurate certified payrolls) and 1777.5 in the employment of apprentices on public works projects. Further, overtime must be paid for work in excess of 8 hours per day or 40 hours per week pursuant to Labor Code Section 1811- 1813.

3. Special prevailing wage rates generally apply to work performed on weekends, holidays and for certain shift work. Depending on the location of the project and the amount of travel incurred by workers on the project, certain travel and subsistence payments may also be required. Contractors and subcontractors are on notice that information about such special rates, holidays, premium pay, shift work and travel and subsistence requirements can be found at www.dir.ca.gov.

4. Only bona fide apprentices actively enrolled in a California Division of Apprenticeship Standards approved program may be employed on the project as an apprentice and receive the applicable apprenticeship prevailing wage rates. Apprentices who are not properly supervised and employed in the appropriate ratio shall be paid the full journeyman wages for the classification of work performed.

5. As a condition to receiving progress payments, final payment and payment of retention on any and all projects on which the payment of prevailing wages is required, Contractor agrees to present to City, along with its request for payment, all applicable and necessary certified payrolls (for itself and all applicable subcontractors) for the time period covering such payment request. Contractors shall submit certified payroll through LCP Tracker or similar system as directed by the City. The term "certified payroll" shall include all required documentation to comply with the mandates set forth in Labor Code Section 1720 et seq, as well as any additional Agreement with Rising Edge Technologies (California), LLC Page 60 of 66 documentation requested by the City or its designee including, but not limited to: certified payroll, fringe benefit statements and backup documentation such as monthly benefit statements, employee timecards, copies of wage statements and cancelled checks, proof of training contributions (CAC2 if applicable), and apprenticeship forms such as DAS- 140 and DAS-142.

6. In addition to submitting the certified payrolls and related documentation to City, Contractor and all subcontractors shall be required to submit certified payroll and related documents electronically to the California Department of Industrial Relations. Failure to submit payrolls to the DIR when mandated by the project parameters shall also result in the withholding of progress, retention and/or final payment.

7. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1 (a)].

8. No contractor or subcontractor may be awarded a contract for public work on a public works project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. Contractors MUST be a registered "public works contractor" with the DIR AT THE TIME OF BID. Where the prime contract is less than $15,000 for maintenance work or less than $25,000 for construction alternation, demolition or repair work, registration is not required.

9. All contractors/subcontractors and related construction services subject to prevailing wage, including but not limited to: trucking, surveying and inspection work must be registered with the Department of Industrial Relations as a "public works contractor". Those you fail to register and maintain their status as a public works contractor shall not be permitted to perform work on the project.

10. Should any contractor or subcontractors not be a registered public works contractor and perform work on the project, Contractor agrees to fully indemnify the City for any fines assessed by the California Department of Industrial Relations against the City for such violation, including all staff costs and attorney's fee relating to such fine.

11. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

8. Audit Rights
All records or documents required to be kept pursuant to this Agreement to verify compliance with this Exhibit shall be made available for audit at no cost to City, at any Agreement with Rising Edge Technologies (California), LLC Page 61 of 66 time during regular business hours, upon written request by the City Attorney, City Auditor, City Manager, or a designated representative of any of these officers. Copies of such records or documents shall be provided to City for audit at City Hall when it is practical to do so. Otherwise, unless an alternative is mutually agreed upon, the records or documents shall be made available at Contractor's address indicated for receipt of notices in this Agreement.

C. Enforcement

1. City shall withhold any portion of a payment; including the entire payment amount, until certified payroll forms and related documentation are properly submitted, reviewed and found to be in full compliance. In the event that certified payroll forms do not comply with the requirements of Labor Code Section 1720 et seq., City may continue to hold sufficient funds to cover estimated wages and penalties under the Agreement.

2. Based on State funding sources, this project may be subject to special labor compliance requirements of Proposition 84.

3. The City is not obligated to make any payment due to Contractor until Contractor has performed all of its obligations under these provisions. This provision means that City can withhold all or part of a payment to Contractor until all required documentation is submitted. Any payment by the City despite Contractor's failure to fully perform its obligations under these provisions shall not be deemed to be a waiver of any other term or condition contained in this Agreement or a waiver of the right to withhold payment for any subsequent breach of this Exhibit.

4. City or the California Department of Industrial Relations may impose penalties upon contractors and subcontractors for failure to comply with prevailing wage requirements. These penalties are up to $200 per day per worker for each wage violation identified; $100 per day per worker for failure to provide the required paperwork and documentation requested within a 10-day window; and $25 per day per worker for any overtime violation.

Agreement with Rising Edge Technologies (California), LLC Page 62 of 66

EXHIBIT E

SAMPLE WORK AUTHORIZATION FORM
This work authorization ("Work Authorization") is made pursuant to the Agreement for Service between the City of Santa Clara and Rising Edge Technologies (California), LLC ("Agreement"). This Work Authorization is governed by the provisions of the Agreement and is hereby incorporated into that Agreement by reference. All Services shall be using the terms and rates included in the Agreement. In the event of any inconsistency between the terms and conditions of the Work Authorization and the Agreement, the terms and conditions of the Agreement shall govern and control.

PART A: GENERAL INFORMATION
WORK AUTHORIZATION D Original
NUMBER: D First Revised
Contract No. D Second Revised
D Other
Contractor Name/Address:

Expiration Date of Agreement:

Contractor's Project Manager: Name: Email:

City's Project Manager Name: Email:

Period of Performance for this Start Date: Expected Completion Date:

Work Authorization:

Maximum Compensation of Agreement:

Previously Committed Funds:

Available Funds
Maximum Compensation for this Work Authorization
Remaining Available Funds
Sufficient funds are available in Fund #:
(to be completed by City)
Contractor Representative Name (Print)
Contractor Representative Signature
Contractor Representative Signature Date
City Project Manager Name (Print)
Authorized City Representative (Print)
City Representative Signature
City Representative Signature Date
* Authorized City Representatives include Electric Utility Assistant Director, Chief Electric Utility Operatinq Officer, Chief Electric Utility Officer
Agreement with Rising Edge Technologies (California), LLC Page 63 of 66 PART B: SERVICES TO BE PERFORMED

1. REVISED WORK AUTHORIZATION
□ No
D If yes, provide a brief description of the change(s).

2. SCOPE OF SERVICES TO BE PERFORMED
The Contractor shall perform the service(s) described below in accordance with all of the terms and conditions of the Agreement. (Insert a detailed Scope of Services below or attach as a separate file.) Scope of Services and cost proposal shall meet all of the provisions of Section 8 of Exhibit A and Section 2 of Exhibit B.

Agreement with Rising Edge Technologies (California), LLC Page 64 of 66

3. COMPENSATION
a. Basis of Compensation: D Time & Materials D Fixed Fee b. Reimbursable Expenses:

D No expenses are reimbursable.

D Expenses are separately reimbursable in the maximum amount of:
c. Payment Schedule:

D Monthly D Completion of Deliverable/Milestone D Completion of Services
d. Payment Terms. Provide payment terms below or attach as a separate file. *Payment for on-site labor may not be paid in advance. On-site labor shall not be invoiced until completed and Customer will not make payment until certified payroll is approved.

4. LIQUIDATED DAMAGES
D Liquidated Damages do not apply.

D Liquidated Damages apply as follows:

It is mutually agreed by Contractor and City that, in event completion of the Services to be provided by the Contractor under this Agreement is delayed beyond ________ _ 20_, City will suffer
damages and will incur other costs and expenses of a nature and amount which is difficult or impractical to determine. The Parties agree that by way of ascertaining and fixing the amount of damages, costs and expenses, and not by way of penalty, Contractor shall pay to City the sum of _______________ dollars($ ____ __, per day in liquidated damages to a cap of ____ . Contractor agrees that City may deduct the amount of said unpaid damages from any money due or that may become due to Contractor under this Agreement.

Notwithstanding the foregoing both Parties understand and agree that no liquidated damages shall accrue for delivery delays due to any modification of the Scope of Services, for delays caused by or attributable to the City, for delays caused by or attributable to third parties not under the direct control of Contractor or any force majeure event during the period of service of this Work Authorization.

Agreement with Rising Edge Technologies (California), LLC Page 65 of 66 Such liquidated damages shall be the City's sole and exclusive remedy for Contractor's failure to meet the agreed delivery schedule.

5. ACCEPTANCE CERTIFICATE
D Acceptance Certificate not required.

D Acceptance Certificate required.

Agreement with Rising Edge Technologies (California), LLC Page 66 of 66

← All documents from this meeting