10/08/2024 Item # 5
City Council
Item #5: MND/MMRP and
Route Approval for the SVP
115kV Transmission Line
from NRS to KRS
1852
RTC 24-751

THE MISSION CIT
October 8, 2024

SILICON
VALLEY
POWER

CITT OF CANTA CLARA
Agenda
• Background
• Project Description and Overview
• CEQA Process
• Public Comments Summary
• Electromagnetic Field (EMF)
• Project Schedule
• Recommendation
POST MEETING MATERIAL 1
10/08/2024 Item # 5

SILICON
VALLEY
POWER.

CITY OF CANTA CLARA
Electric System Growth
• SVP has continued to see increased energy
consumption averaging 6% over the last 3 years
• Recorded a new peak load of 705MW in July 2024
and again 718MW in October 2024
• In September 2021, City Council accepted SVP's
Three-Year System Growth Plan
• In November 2022, City Council also accepted SVP's
System Expansion Plan
• 5 Key projects:
- Kifer Receiving Station (KRS) Rebuild
- Scott Receiving Station (SRS) Rebuild
- Northern Receiving Station (NRS) Upgrades
- LS Power Transmission Line (CAISO Project)
- 115 kV Transmission Line

SILICON
VALLEY
POWER

CITY OF SANTA CLARA
Status of Projects
• SRS and KRS
• 90% Design Underway
• Major Material Procurement (In-Progress)
• Anticipated Beneficial Use Completion - 2028
• NRS
• 60 % Design Underway
• Major Material Procurement (In-Progress) Scott Receiving Station (SRS) • Anticipated Beneficial Use Completion - 2027
• Bond Financing for SRS, KRS, and NRS- First
$130 +/- million bond scheduled to close next
week
• Positive feedback and significant interest from
markets in SVP
Kifer Receiving Station (KRS)
2 10/08/2024 Item #5
SILICO
• VALLI
OWE

YORSANTA CUA
CAISO Transmission Line from PG&E Newark
Station to SVP Northern Receiving Station
• LS Power will own and operate
• Target in-service date - 2028
• SVP was recently informed that CAISO recommends that the Line be upgraded from 500MW to 1,000MW
• CAISO Board November 2024
• Stakeholder comments were due today (10/8/2024)
• SVP was also informed that CAISO is analyzing additional transmission opportunities - 2025

SILICON
VALLEY
POWER

CITY OF CANTA CLARA
115kV Transmission Line
Northern to Kifer Receiving Station NORTHERN
-RECEIVING

STATION
• Project Scope: Construct a new 115kV overhead
©te
transmission line of approximately 2.24 miles between BATAT ALERICA KV Northern Receiving Station and Kifer Receiving Station. Agnes i America? RoaD
• Needed to accommodate approved and under construction © Misson College
load growth and reliability
• Transfer additional power and redistribute loads (101 NORTH Bassett Street CLAI
• System Operating Limit will be limited to ~ 819MW if George KIFER * Street
transmission line is not constructed O SCOTEL RECEIVING

STATION
• System Operating Limit with it ~ 1300MW
• Key Items: schedule, constructability, and power delivery Avenue
• Construction is estimated to take approximately 14 months LEGEND Route A
and be completed by early 2028. Route B
Route C
3 Item # 5
10/08/2024

SILICON
VALLEY
POWER.

CITT CASANTA CATA
115kV - Three Routes Considered

NORTHERN
• Council Information Session March 2024 RECEIVING

STATION
• An assessment was prepared to determine the preferred route for the Proposed Project. GREA: AMERICA PAW
• Route B (considered and eliminated) Agnew Road
• UPRR right of way is too narrow (concerns with
© Mission College
inductive interference on the rail lines and additional permitting and design review) Basselt Str NORTH |
CLAI
• Properties surrounding UPRR do not have sufficient George KIFER Street
space to place structures RECEIVING

SOWERS STATION
• Require extensive easement costs and coordination
• UPRR permits Avenue
LEGEND
• Even if it was feasible, it would not meet 2028 schedule Route A Route B
Route C

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Three Routes Considered

NORTHERN
• Route C (considered and eliminated) RECEIVING

STATION
• Majority within Creek boundaries GREAT AMERICA KIT
• Replace existing 6okV line where available Agnew
• Easements and permitting - unknown if Road
permits would even be feasible and if feasible
• Mission College
would not meet schedule due to extensive
101) NORTH:
permitting schedules Bassell Street CLAI
George
• Longest route KIFER Street

RECEIVING
• Would not meet 2028 schedule STATION
• Route A (Proposed Project) - Analyzed in IS/MND
Duang
Avenue
LEGEND
Route A
Route E
Route C
4 10/08/2024 Item # 5

SILICON
VALLEY
POWER.

CITY OF CANTA CLARA
Proposed Project - Route A NORTHERN

RECEIVING
Total Route Spans 2.24 miles STATION
• Northern Segment (NRS to Agnew) SREAT AMERICA EXW
• 0.74 miles Agness
Roac
• Overhead and underground options
• Misvion College
• Lafayette Street
(101 NORTH S
CLAI
• Southern Segment (Agnew to KRS) George
KIFER • Street
SCOT: SLVO RECEIVING
• 1.5 miles

STATION
• Replaces existing transmission lines where available
Duane
• Lafayette Street, Bassett Street, Duane Avenue Avenue LEGEND
Route A - Northern Segment
Route A - Southern Segment

SILICON
VALLEY
POWER

CITY GE SANTA CLARA
Overhead Northern Segment (Preferred)
Northern Segment (0.74 Miles)
• Nine new poles within center median of Lafayette Street • No existing overhead transmission
• Residential development on both sides of Lafayette Street • Poles spaced every 250-500 feet on average and
~85-135 feet in height
• Located within existing ROW or easements
• Minimal utility relocation
Looking North on Lafayette Street just south
• Would minimize landscape/tree removal as part of design of Hope Drive • An overhead transmission line can deliver more power and accommodate future growth with the option for a future underbuilt 6okV or 115kV transmission line 5 10/08/2024 Item # 5

SILICON
VALLEY
POWER.

OTY OF CANTA CLARA
Underground Northern Segment (Not Preferred)
prosimate Locason Alor
• Constraints with constructability, schedule, Existisg Usity Quanly Sire Ductes no he 5 comer South of Agrew R
and power deliverability
Soth of Are Roo
LOTTEN
• Constructability South of Agrew Re
• 25 existing utilities crossing or conflicts with Satiny Sevel Sun of AgreE underground alignment in Lafayette San Ages Rt
Move On SP
• High water table and may require excavations South of Agime Ra greater than 20' deep
Utility spacing requirements may not be met
• Requires relocation of 300 feet of two
transmission gas mains for PG&E and DVR
i and ver
• The DVR shutdown scheduled twice a year
• Will require extensive PG&E construction
Santary Some
activities, on PG&E schedule, and will not
meet 2028 schedule

SILICON
VALLEY
POWER.

CITY OF CANTA CLARA
Underground Northern Segment (Not Preferred)
• Schedule
• The DVR shutdown scheduled twice a year
• Will require extensive PG&E construction Constructed
at 230kV
activities, on PG&E schedule, and will not meet Energized 2028 schedule at 115kV
• If feasible, it will require a minimum of 3 additional years likely at least 5 for project completion
• Power Delivery: Designer
• Can deliver up to 83% of the power of overhead at or 115k) 115kV due to limited heat dissipation (Future)
• Further declines at the 230kV level to 79.9%
• No opportunity for future underbuild Typical
Stacked
Configuration
6 10/08/2024 Item #5
ATTACHMENT 4- TYPICAL POLE TYPES -OVERHEAD SHIELD WIRE
230 KV RISER POLE
Underground Northern

TERMINATOR
Segment TRANSITION BETWEEN

OVERHEAD BARE CONDUCTOR OVERHEAD CONDUCTOR
TO UNDERGROUND CABLE! TWO SUB-CONDUCTORS

PER PHASE)
• Additional items for consideration UNDERGROUND CABLE
(TWO GABLES PER PHASE
• Aesthetics:

ARRESTOR
• Overhead alignment from NRS to riser ELECTRIGAL PROTECTION

FOR UNDERGROUND CABLE)
pole in median of Lafayette Street

DEADEND STRAIN INSULATORS
• Additional riser pole just south of INSULATED ATTACHMENT

VARIOUS SUPPORT HARDWARE POINT FOR OVERHEAD

TARTS AND CHILE PLANES U CONDUCTOR TO STRUCTURE)
Agnew on east side of Lafayette Street SECURE CABLES AGUNST MOVEMENT DURING OPERATION:
• Cost
• Approximately $19M (does not include CABLE SHROUD
PG&E costs) (PHYSICAL PROTECTION FOR

EXPOSED UNDERGROUND CABLE)

CONCRETE FOUNDATION
Typical Underground (SUPPORT FOR STRUCTURE AND
Riser Pole ENTRANCE OF CABLES INTO

UNDERGROUND DUCTBANK

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Comparison of Options for Northern Segment
Overhead (Preferred) Underground (Not Preferred)
Ability to meet 2028 schedule. Can not meet 2028 schedule Relying on PG&E for utility relocation
Deli shut down
Maximum transmission capacity Reduced transmission capacity Ability to accommodate future growth Lack of provisions for future growth Minimize utility relocations and reduce construction Extended construction timelines with extended lane disruption to the public closures and traffic control
Ease of maintaining the system Longer restoration times in emergency situations Northern Segment Costs: ~$9.5 Million Northern Segment Costs: ~$19 Million Total Project Costs: ~$36 Million Total Project Costs: ~$45.5 Million 7 10/08/2024 Item # 5

SILICON
VALLEY
POWER

CITY OF SANTA CLARA
Overhead Summary Discussion
Three Key Items
• SVP controls the schedule - can meet the 2028 energization Constructed • Accommodates future additional growth at 230kV
Energized
• Maximum transmission capacity - can accommodate ~20% at 115kV more power than underground options
Additional Items
• Reduced construction disruption to the public in comparison Designed for 115kV
to underground options (Future)
• 50% less cost for the overhead northern segment compared to the underground alternative
• Ease of maintaining the system/restoration in emergency Typical Stacked
conditions Configuration

SILICON
VALLEY
POWER.

CITY OF CANTA CLARA
Southern Segment (1.5 Miles)

NORTHERN

RECEIVING
• Two existing 60kV overhead transmission lines. Between

STATION
Agnew and Montague, existing 60kV at the following OLet adum locations would be replaced

1. East side of Lafayette Street

2. West side of Bassett Street
Mission College
• At Montague Expressway, continue on west side of Bassett 701) NORTH
Street and replace 1,120 feet of 6okV where existing and CLA Goorge
install 2,980 feet of new overhead 8r Street
un. RECEIVING
• Final 980 feet of transmission line from just north of SCOT ILO STATION Bayshore to KRS along Duane Avenue would replace an
Duare
existing 6okV transmission line "LEGEND
- Route A - Northern Segment
•• Route A - Southern Segment
8 10/08/2024 Item # 5
- SILICON
VALLEY
POWER.

CITY OF CANTA CLARA
Southern Segment
*Distribution and transmission
From TO Alignmen Approximate # of Poles Installed Poles Consideratio Easements Removed
Montague 4 Non-Residential 7 9
Agnew Road ast side of Latayet
xpresswa id west side of Basse Easements
Montague assett an West side of Bassett 13 Non-Residential 11 11* Expressway eorge Stree Easements
Bassett and 3 Non-Residential 7 3
Kher Racerving East sidane Seet and
George Street Easements
Looking South on Lafayette Street just Looking South on Bassett Street just Looking South on Duane Avenue just south of Anew south of Montague south of Bayshore

SILICON
VALLEY
POWER

VTRCCANTATEEARA
Items Completed In Addition to CEQA
Requirements
• Project Scoping Meetings & Scoping Report
- No CEQA requirement for public scoping for an IS/MND, however SVP held a 50- day scoping period to solicit public input
- Hosted two virtual scoping meetings
- Prepared Public Scoping Report (IS/MND Appendix F), which provided responses to comments received during scoping
• EMF Report
• In Person Public Engagement Meeting during 30-day Draft IS/MND public review • Written response to comments on the Draft IS/MND
• No CEOA requirement to prepare written responses to comments received on raft IS/MND, however, SVP provided this in Final IS/MND Section 7 (Respons to Comments)
9 10/08/2024 Item # 5
- SILICON
* VALLEY
POWER.

CITY OF SANTA CLARA
CEQA Process + Comment Opportunities
• Identify Project Need • Publie Scoping Comment Period (50 days; April 8, 2024 - May 29, 2024)
• Preparation of conceptual
design and start of CEQA • 87 scoping comment letters* received. Scoping comments were included in the Draft IS/MND.
• Scoping
• Public Engagement Comment Period (30
• Prepare days; July 31, 2024 - August 30, 2024)
Proposed IS/MND
• 78 public comment letters* received. Public
• 30-day IS/MND Public comments were responded to in the Final IS/MND, Review Period
published September 24, 2024.
• Consider Comments &
Finalize IS/MND
City Council Consideration * Several comments received were identical "form" letters, which include the same text in the body of the comment but were signed individually by the sender. Several individuals sent in more than one comment letter, and several comments were sent from repeat addresses.
- SILICON
VALLEY
POWER

OTY OF SANTA CLARA
Contents of Draft IS/MND
• Sections 1 - 4: Mitigated Negative Declaration Form, Environmental Determination, Introduction, and Description of Project.
- Section 4 (Project Description) includes discussion of EMFs • Section 5: Includes analysis of the environmental issue areas presented in last slide, following the CEQA Appendix G checklist
• Section 6: Mitigation Monitoring and Reporting Plan (MMRP) • Appendices: Includes preparers, references, Air Quality calculations, Biological Resources, and Draft Arborist Report
- Appendix F: Scoping Report
• Created due to extensive public interest in the project. The scoping report describes the comments received, provides a summary, and identifies where the response is located in the Draft IS/MND - Appendix G: EMF Report
• Created due to public concern about EMF, provides technical details which support the analysis in the Draft IS/MND
10 10/08/2024 Item # 5

SILICON
VALLEY
OWEN

TY OF SANTA CLAI
Contents of Final IS/MND
• The Final IS/MND (published September 24, 2024) includes revisions to the body of the Draft IS/MND plus responses to public comments.
- Revisions are made only when substantive comments bring to light new information not covered, or when it is necessary to correct the text. • Section 7 (Response to Comments)
- This section presents Responses to Comments received on the Draft IS/MND and identifies where they are addressed in the Final IS/MND. • Appendix H (Public Comments on Draft IS/MND)
- This appendix presents copies of all public comments received on the Draft IS/MND.
- SILICON
VALLEY
POWER

OITY OF SANTA CLARA
Scoping Comment Summary
• Health concerns - electromagnetic fields (EMF)
- See Final IS/MND Section 4.15, Electric and Magnetic Fields Summary, Appendix G (EMF Report) • Increased risk for catastrophic accidents and fire hazards - See Final IS/MND Section 5.9 (Hazards and Hazardous Materials), Section 5.17 (Transportation), and Section 5.20 (Wildfire)
• Impact on home insurance costs and property value
- Not within the scope of CEQA, see Final IS/MND, Appendix F, Scoping Report • Aesthetics
- See IS/MND Section 5.1 (Aesthetics)
• Complexity and inconvenience
- See Final IS/MND Section 5 for a discussion of constructions impacts for each environmental resource 11 10/08/2024 Item # 5
• SILICON
› VALLEY
POWER.

CITY ICE CANTA CLARA
Draft IS/MND Comment Summary
• General Response #1 - Human Health and Scope of CEQA
- Not within the scope of CEQA, see Final IS/MND Section 7 (Response to Comments) • General Response #2 - Electric and Magnetic Fields
- See Final IS/MND Section 4.15 (Electric and Magnetic Fields Summary), and Appendix G (EMF Report) • General Response #3 - Corona and Induced Currents
- See Final IS/MND Section 5.21 (Corona and Induced Current Effects) • General Response #4 - Property Values and Costs
- Not within the scope of CEQA, see Final IS/MND Section 7 (Response to Comments) • General Response #5 - Aesthetics
- See IS/MND Section 5.1 (Aesthetics)
• General Response #6 - Noise
- See Final IS/MND Section 5.13 (Noise)
• General Response #7 - Hazards
- See Final IS/MND Section 5.7 (Geology and Soils), Section 5.9 (Hazards and Hazardous Materials), Section 5.15 (Public Services), Section 5.17 (Transportation), and Section 5.20 (Wildfire)

SILICON
VALLEY
POWER.

CITY OF SANTA CANA
EMF Study - Overview
• The EMF Report estimated magnetic field strengths
relative to the proposed transmission line
- Transmission line centerline used as origin
- Existing facilities were considered in analysis
Divided the route into unique segments to represent t
cal conditions along the line based on differing variabl such ad, distance ber of facilities, heights above/below • Magnetic fields are able to pass through most
materials
• Electric fields can be blocked by solid objects such as walls and trees
12 10/08/2024 Item # 5

SILICON
VALLEY
POWER

CITY OF SANTA CLARA
EMF Study - Methods
Each segment was calculated to represent th
/pical value for normal and peak loadin
• Existing power facilities were identified and
modeled using data from SVP
- Both current year model (2024) and future
proposed transmission line (2028) were E(120)
studied at Peak and Normal loads for
modeling of the magnetic field strength
- Peak Load is based on the highest loading of
the given facility during normal operations
* Magnetic field strength was calculated using design
software per the Electric Power Research Institute (EPRI) AC Transmission Line Reference Book

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
EMF Study - Results Existing & Future
115kV Transmission Line in 2028
SEC. 1:
• Segments 1 - 3 are located near residential
• SEG. 2
land uses. Measurements presented below
SEG.
represent the magnetic field levels at 60
feet east of the transmission line.

Segment Future 2028 (at 60 ft east of centerline)
SEG. 3
Normal Load (mG) Peak Load (mG)
1 16.0 20.0
SEO.
2 14.3 17.9
3 14.2 17.7
SER E
SEC.
13 10/08/2024 Item #5
•SILICON
VALLEY
POWER.

OTY OF SANTA CLARA"
EMF Study - Results & Comparison
Magnetic Field Measurements* at 1 foot
Item distance (mG)
Segment| Future 2028 (at 60 ft) Ceiling Fans 3 to 30
Electric Ovens 4 to 5
Normal Load Peak Load
(mG) (mG) Electric Ranges 8 to 30

14.2-16.0 17.7-20.0 Electric Can Opener 40 to 300
1-3
Source: Appendix G, EMF Report Microwave Ovens 4 to 200 Washing Machines 7 to 30
Portable Heaters 20 to 40
Vacuum Cleaners 60 to 200
12kV Distribution 12 to 15**
Source: NIEHS, 2002
*Values represent a range of EMF values from Median to Highest **Typical range calculations for 12kV distribution line measured just below alignmen ased on SVP load data (not NIEHS)

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
EMF Summary
• There is no defined or adopted threshold for EMF impacts - There is no agreement among scientists that EMF creates a potential health risk • The Final IS/MND also includes recommended EMF Design Guidelines by the California Public Utilities Commission (CPUC)
• SVP project development always considered and implemented the following CPUC guidelines in project design:
- Increase the distance from electrical facilities by
• Increasing structure height
• Locating power lines closer to the centerline of the corridor - Reduce conductor (phase) spacing
- Phase circuits to reduce magnetic fields
14 10/08/2024 Item # 5
Schedule
Task Timeframe
Design Feb. 2023 - May 2026
Easement Acquisition Jan. 2024 - May 2026
CEQA Process
Identify Project Need Jan. 2024
Preparation of conceptual design and start of CEQA Jan. 2024 - Mar. 2024 CEQA Community Outreach (Scoping) April 8 - May 29, 2024 Publication of Draft IS/MND and 30-day Public July 31, 2024 - August 30, 2024 Review Period
Publish Final IS/MND September 24, 2024
City Council Consideration October 8, 2024
Permits Feb. 2024 - Nov. 2025
Material Procurements Oct. 2024 - Nov. 2026
Anticipated Construction Nov. 2026 - Mar. 2028

SILICON
VALLEY
POWER.

CITY OF SANTA CLARA
Recommendation

1. Adopt a Resolution adopting the Mitigated Negative Declaration and the Mitigation Monitoring and Reporting Program for the New 115kV Transmission Line Project between the Northern Receiving Station and Kifer Receiving Station; and

2. Approve Route A, Option 1, for an entirely overhead alignment of the Rever stay to make minor ale with thostments based on Vally project engineering and design
15 10/08/2024 Item # 5
City Council
Item #5: MND/MMRP and
Route Approval for the SVP
115kV Transmission Line
1852 from NRS to KRS
RTC 24-751

THE MISSION CITY
October 8, 2024
16 Residents Near Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave Legend HEALTH
- Route A (1000+ families)
Route B (1000+ families) RISK
• Route C (0 houses)
• Route D (existing infra)
ALERT
Intel Museum e
OPPOSE SVP 115kV NEW POWER LINE VIA

RESIDENTIAL ROUTE A AS HUGE HEALTH RISK
Route A & Route B impact 1000+ families &
teerican Barbell Chos O C
© Asplied Materiali small businesses
@ Mustin Communin
ASK SVP TO CONSIDER Route C
ViceNov O
non-residential route or existing Route D

CALL TO ACTION
JOIN Join WhatsApp community here →
COUNCIL Attend Oct 8 council meeting
Educate your neighbors about

MEETING
health risk for children & elders
IN-PERSON Request City Council/SVP to
consider Route C or Route D

TUESDAY REASONS TO OPPOSE
OCTOBER 8 115kV~230kV LINE ROUTE A
5:00PM - 8:00PM PLAN
••.. EMF radiation & Increase in housing &
cancer risks insurance costs
Address:

City Hall Council Increase risks of Significant decline of $
Chambers accidents business revenues
1500 Warburton Ave
Santa Clara, CA 95050 Huge decrease in Alternate best options housing values Route C possible
Email [email protected], [email protected], [email protected] for accountability Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature

9.3024 SIMRIT SINLI
930

CHARLTON VARIAN
9-50i024 Kevinder Bugh
1001-224 Left sch
10 0120 тик men

10.01.2024 Nur Shambiera
1: 01-2024 - 408-6/31-6610
10-1 Don - Agra Anto
10-/ Garudo Hanute stut
10 | Miyat Gupta
10-1 steam
10-1 Nanay luong
N0-1 an Palt
10-1
10/1 Gal fam км-д
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/01ro4 Zhenlin Kan Funtan
relike Yu-Tung Tuegy Yurry by
1011124 Vivek. KR
10/124 Precthi. M.L Hand
1011129 Steven Pang ston
1ol1lz4 Neclam Dabholkar Pathotbar
10/1/20 Aman Sharma
10 1724 Ruc hike Kohl
101/24 Sagnit Roy
10/1/24 suekha Shavara Shayna
10/1/24 Jeroo Kekobad.
10/1/24 Kanupriya Kabra Kampiza Keba
101/24 AMIT CHANDAK Anut
10/1/24 Uma Tambe
10/1/24 VINITA KARBHARI
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing View & transmission lines, we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currentiy acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/01/24 Ratin Batche B V Roleri
10/01/24 ule
swapna Auche
Hail mirad pimportan stur
10/1/24 Shrocta Pimporter Bims
1001/24 VIC SHARMA Whamel
10/1/24 SHEETA AGARWAL sim
10/1/24 Jeffrey Willian.
10/1/24 Vasanti truva
10/1/24 Srinivas Avuva
10|1/24 Hari priya Gondi Henry leu
10|1/24 Lakshmikarth Pothula ProChade
10/1/24 Hima Sre Chundi C.N. Hille
1011/24 Paupa Thalepar
10/1/24 Neil Banerjee
10/1/24 Malini Banerjee Malini Bareje
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/1/24 Vandana Gupla baby.
10|1/24 Amit Agrawal
iky Naga Defina DiNfallain
10/b4 Suresh pinnebsine
10/1/24 Jamshid Kahabad
10/1/24 DILSHAD Kekobad Elish
10/1/4 Seron Park
10/124 JaeJung Lee
10|1/24 Chris Blach
10l1b Dutt Kalapatapu Casan
10/1/24 Hira kalapatapu

10. 24 Kanthe Chandran
101/14 Janih Kena st
10\1/2024 Vidya Kiampanidhi
10/1/2024 UDHAYA CHANDRAN

SHANMUGAM
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project inpacing Background 1000+ families & small businesses along Lafayette St, Wicox Ave, Payne Pl, Kingsbury Cir, Basset St. Duane Ave Even underground option does not mitigate cancer & heath risks from high Electromagnetic Fields EMF Resident We are petitioning to adopt Route C proposed in initial study of the project and or build over eristing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 m demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
Zihaakon

10.1.24 in/24 Sean fujivira
i0l0/24 Kelly Acevedo
10/0124 Saurabh Sharma Samath
10/01/24 Nehra Batchu B. Nethes
10/01/24
1401/24 Jose Maltow
10/1/24 Anu Alex
10/1/24 Thomas Mathew
10/1/2h Sachin Morbid MaNa Ha
101,124 Sigisha Shutte 1yLls
10/1/24 Om Shankar
10/1/24 PRAVIAR THARLIYAL
10/1/24 Pratima Hans
10l1/24 Saicharan Macha
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/01 Sanjana. N -
10101 Irina Chubarova Cluban
10/01 Kivan Palukuri Kkeel
10/01 Tau a Rdeau. Rum they
10/01 WENLI LI hall
iolo1 Sumitha 7
i0 o1 Shee, Fareth
Shes.
10/01 Sumerdran M
1aor Vikram Kapoor Us
18|1 JIMAR FARPOR
10/1 Lisandro Castillo
10/1 John Monis
101 Tampfetin
10/1 KIRAN YONSUR
10/02 James. Sausan
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/1/24 Hima Bide Vangan Padu
10|1/24 Kajur Gae kuand aju.
10/1/24 Niharika Gandi Nilaikes
10/1/24 Sai Kiran Stirry
10|1/24 Ajay kumar Attutur Arguerr
10|1/24 Adithya Atholi Athr
10/1/24 Chauthanya Thandopu Hithere
10lı/24 Cowothami Alleri Gowthere
dily Kirandaddy kothe Kinseaty
10/2/24 Archana Thule Archare
10/2/24 Rahul Jhube Rhake
10/5/24 Damiel Tican ta -
145/24 SYED AHMET
12/5/24 Shiva Bakush
1olshg Bathi nasabapathy
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/01/24 Amit Kale
10/01/24 Aruna Kannan
10/0124 VENKATESM BALASUZRAMA
10/01/24 SUCHITHRA ACHUTHAN
profile
10/0124 Swat Bine
10/01/24 KUHHKA SAKNA Rues
10/02/24 Yuri Kleban You lie
1062/14 Allysa Kleban preflete

10.2/224 ERiC Wang Eric Wang
10/2/24 kat/s
10/2/24 Huivan Jin
10/2/21 Hidhikamyl
10/2/24 Suren Munagala Minaud
10/2/24 Alok Bhargava
10/2/24 Meenu Bhargava Unthargery
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
100124 Cipson Jose C.
10/01/24 Alana Cipson Alan
10/01/24 Punnya Ann Joy Punyyes
10/01/24 LEONARD LE alle
10/2/24 NIAZ KHAN Nather
10/2/24 RAHUL KHONA
10/2/24 ABHiLASHA PANT Pant
10/2/24 GEETA PANT
Fan
10/3/29 VENKAT PATCHIGOL A
10/3/24 GAYATHRI CHERROLU
10/3/24 SANDEER JAIN
10/3/24 CHANDNI JAIN Chandisfai
10/4/24 JAMES OonnoR
10/4124 PRASAD SWAMINATH & Prand
10/4/24 KEDANGUDI RAMAN
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/2 John Castro
10/2 TOM ROMER And Rne
10/2 mesdog Bobte
1%2 CesarMoreno Cater
10/2 Sofia Quintana fola
10/2 Ryan Andaya
10h Edunto Lucatero lets
JOSEPH LOMBA joel Lende
10/2 foot tonsh
10/2 Haschal Downs How Joe
10 / 2 Wendy Mejia Wendy
10/2 Leif Ler Berr
10-2-24 DALSTE
10-2-24 PRATIK
102-21 Priya s
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/2. Soungara de. SDs /
10/2 Ashwrini. ks
10/2 Pratik Hazari
10/2 Umesh Malhotra
10/2 Milies
10/2
10/2 AMRUDH S sweety,
10/2 Thomas Yiu
102 Saifan Hac
10k V. Similles
10/2 Danya Li
10/2 Aknil Gommadi
CANDICE PANKAT Carlage
10/2
10/2 JOE BAGNUTI gabright
10/2 Byrun Esquie
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/2 Brandon Lun
102 Lou
10 г Jasjay Kanchandrar
konok Chapa Das
1o2
VISHEATYA upsider
10v
1o2 Ashish Prakash
lov Smaiti Roy
102 Filbert Sahja
10v Pawan Singh
102 Cornel Marcu
107 Don Norther DuD
10~ Stella Fing Stelle
Mangu Shiva
lor MANUEl GallAndo
NITESH JAIN yes.

Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
Oct. Kamackaitany.
1-2024 Lavukuru
- Seena Nasila
Oct and Vertime , Tha verner
Oct and Akshat Manh
oct 2nd SPatel
0c72° Corina Tyagi Стуаді
oct aro Rubi Moralez
oct and
sen trendenged
Oct aut LILIAN SANTIAN
Oel aut Dian Dis:

Ankita Harmalkor shal
bef arel Nayana Vishva
octand Mridula Shasty
Get art Vishnu Yauya Kanhar
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/2 SHANKAR PANDRAVADA Pillamin
10/2 P.Masini

HARINI TADINADA
10/2 Sith Thwan
10/г Адуте Chrang
102 Sur KanPIkKAL
102 ZOHEB VACHERI
10/2 PURUSHOTTAM MISHRA Path lie
10/12 MEN JAIN
10/2 USHAKA SUTRAVE
10/2 Onkar Kelkani
10/2 OMKAR MUNIPALLE Onkar.
102 RAJEEV AHLAWAT
10/2 Taewak Kin (6)
10/2 Hyegin On
"/5
Harriga
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/2/24 Vishnu laya Karnan
10/2/2024 RAVIKUMAR NARAYANAN K
102/2024 Sla Ajarual org
Amit Jain.
10/2/2024 Amit Jain
10/4/2001 Veronica Rico Tale
10/4/25241 Veffrey Williams JR.
1014/2024 Sunita G Sunita
10/4/4024 NavenderGod NG
10/4/2034 Pooja Bisht fing
10/4/2024 Ramon Bisht Rosary
10/4/2001 AGron Lee
1014/2024 Stacy lee shee
10/4/74 PARVEEN SHARMA
10/4/14 Share

PARUL SHARMA
10/4/4 KarL Chu
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
1001-2044
Subhasha Ran an
10-1-2024
Jagsiti Singh Joul
102-224 Nicole Spaulding
10-2-2044 SINAPRIYA KAZA Sinaprise Kaza
10-22024 PRANGET MUN GARA
10-2-2024 ANIRUDH Auch
102-2024 Adya
1d02220 Yasher Misiti
1$02/24 Happense Ablat Hayrowe
10/2/24 USHA GANESH Kgushe
10/2/24 SANGEETHA GUNTURT ta put 9.
10/2/24 Vijay Divakianeni Quilth
10/2/24 Sabyasachi Sahe 5.Sal
10/2/24 Aparna Saha Apasta Saha
1013124 Vinay Desai
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
lolabor Gagandeep Kaur Rogentert sou
Brian Shail
10 02/2024 Shaila menezes 64
10/02/2024 Rashwindr Kaur Rashwinkle
10/2/0024 ViTay SUNDAEON
10/2/2924 Vitalii Ampilogov
10/2/2024 Mahmut Altern edeter
19/2/2040 Tammy lostango
10/2/24 Sandy kapoor
Id2/24 Sathya Venugord
1Dct24 Mohamned Suleda hunter
1012124 Abnoza Ahammed
10/2/24 Lawrence Tam
10/2/24 Shivani Parekh
10/3/24 Rueli Mach
10/3/24 Preetika Tiwari
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/02 Yan le
10/02 Yikan quen
10/68 Sudhir Kulkarni
10/68 ujiwala Kulken bsk
10/3 Brian Konicke Rich
10/3 wendi Cao mendica
AKSHAY MAREDI lily
10|3
Durga Kasireddy K.Auf
1013
1013 Chann Ballgeiti
103 RADHA YELURI
10/3 PADMAJA TUMMALA Padys.
10/03 Ingya Wark
10/3 Hafsu Hussein Lufsel
103 JERILI JOY.
10/3
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in view &
demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Name Address Signature
Date

SHARATH
10/3 NARAYAN
103 SohaniRao
10/3
1% abal Chandra Dho pall
10/3 jessica sun
10/3 Ushaswini
10/3
Teresa Chan
10/3 ÉOWARD STRIVE f41f
10/3 SOMs
KITTY DMello
10/3 Vyshnavi Rajanala

NAYA VERDIER
0/3

KATIE ENG
103
jAMES ROMER
10/3
10/3 MADHUMITHA Mally.
10/3 ÁRVIND S
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature

SANDEEP YADAV
10/3/24
10/3/241 SIMPLE YADAV hple
10/3/24 ANUPAMA DESAI ARui
10/3/291 FARZANA FORHAD
10/3/240 leksiy Bugaryev Бусарв
1/3/2y Yulia Aloshychs
10/3/24 APARNA RAmAN RA=.
10/3/24 A Guanalli
10/3184 Kumal Modasiya Hmed sits.
10/3/24 Jalpa Modasion,
10/3/24 AmIT JAIN
10/3/2024 ILA AGRAWAL DIA PLANAL
324 Viorima Matsmto
10/3/21 Ahmed Hefny
Cristina Pfund Cristine Rund
10-4-24
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/3 Jay Pata
1013 Emma Desbieys ame later
10/3 Vincent Desbieys D
10/3 Tejas shah
10/3 Salamat Beibita
Odina Salihbaeva Darf
10/3
10/3 Jinnifer Romer
10/4 Parmi Baradi
10/4 Sidra Jam al Sider
1:14 SOREN DEVER
Sourov Das
104
10/4 Rike Chare Tambin
10/4 Robert Yoshida Robert Yeshida
10/4 Mingi zon Mage shon
10/4 Long han Ther she tho
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
1004/2024 RANJEET RAMALNCAM Raylest
10/4124 Veronika Kocen Whocen
10/4/24 Manali Desai Mdesal
10/4/24 Nikhil Mungre
1014/24 Snigtha Jain Selle
16/424 HARSHA PRIYA GUPTA Haspsiya
10/4/24 Zeshan Anvar
10/4/24 Jinyoung Park Gros
10/4/24 Qing Zhang
1014/24 Ajay kumar Atukori A ABY tur
10/4/24 Megan Lee Meguke
10/4/24 SEOKBIN KANG
10/4/24 Akhil Ranjeet Akhil
10/4/24 DHRUV FOMRA
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
i0 4/24 MANJONATH J.
10/4/24 LINI KURIYAN lhip
10/4/24 PAVAN BATCHU B. Pavars
Payal gupta pals
10/4/24
10/4/24 Shambhou

UNNIKRISHNAN UDINOOR
10/04/24
10/04/24 David Waga
101-4/24 PRASANTA CH
Siddarte Ramesh
10/5k4. Restina Venkotakener
50/5/20 ADITYA GUPTA
1015k4 FRANk NimEn
10/5 Taptor Prom
1 3/5 Wanyi 1i
Petition Objection to proposed "Route A of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St. Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines: we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature

LAURA LIZARAZO
5 I prom I uncer
10/4 ata 8
Rumit Gajesa
10/5
10/5 gladys Balleza
10/5 Avi Saradhya Ali taradleya
10/5/24 Sharon Alano Alla
10/5/24 Adnan Hemani Clutte
1015/74 Jesse Dueñas
16/5/24 Alityu Hain
10/5/24 Amusinee Singhal Renat
10/5/24 Nirat Suini
10/5/24 Pradeepta Dash
Palept
10/5/24 sanita Jagatjita Sanite
10/5/24 Prithvi Arun
10/5/24 Aishwanya Arun
10/1/21 PRASHANT TIWARI Bal
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/5/24 Divya Priya kajendran Ay't
10/5/24 Emans.

Vijay
10/5/24
liong shan Eng to
10/5/24 Trine )lett Pete
10/8/24 Ravi uppuhuri
19424 Anne Kohler
Kanmudi p
10/8/24 TEJAS O
101524. Prabhu Der. _R.
10/5/24 Renno Re-y
10/5/24 April Lei
1015/24
10/5/24 K VAN I
10/524 VANAJA KSHI. R
10/5/24 Beaham Demissie
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/5 Nomina
10/5|24 Nepun Barua
10/5/24 DIPTI BARUA
10/15/24 Ran Amn.
10/5/24 Rishie R. Larora
10/5/24 Raghavendia Moodambail
10/8/24 Sai Karunakar
10/5/24 Hartha
10/5/24 Akash Dewan
10/5/24 Aashna Settri
10/5/24 Loeterch
Eath Puy
1/5/24 Edith Ramos
10/5/24 Jose Rubio
1015/24 Deepiza Manjappu
1015by Alok & Phok
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
15/2 Celine Dang -e
10) = vounda Bhatt
101z Illya Vinnichenko
107 Nadiya Vinnichenka
102 Pratiksha Aganoes Praisle.
102
102 Caution Gonzale unr
102 Thony Chry
10/2 Maus
10/2 Chilf Fen Lin
12 Chien Yuan Kao
102 Anji Yu
1°2 She Try
10/2
1o2
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
0/02/2024 VIKASH TYAGI
2024
154141
10/02/2024 Vinithra Nagary
10/02/24 Douglas Hill
10/0224 My Luck
10/2k4 Str Nause
10/2/24 Kaustith K
10/2/24 Prasad 5
10/224 Walker lepaln
sarah epile Spe
10/osky RORON PAULINO
10/62/24 MATTHEN PAULINO MR
10/2/44 Grapen Chau Maliz
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St. Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10 2 FRATEEK
10/2 Aditya Koparkar
Aditi khire stikline
10/2
10/2 Sai Adblanki
10/2 Diya Ramachandran
10/2 Jimmy law Xen
10/2 Nimish Shah shak
10/2 Ayeshe Ig bal
10/2 Moin A. Hag Montan
10/2 Sagar Vakil Bunvekis
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
105 Shoven
10/5 Auzci
6918 Laffatty
10/5 Vijay Paught ah Big en
105 Chanduke Bhutan Chendila
105 Nel Tonsiend
10/5 Sheila Townsend Nute
10/5 Yifei Lik Lifei Lu
105 Natacha Hardy candy
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/4/24 Anupana Swaminath А.Атрама.

Radha S. Raman R.S.
10/4/24
10/4/24 Kabir Jain Kabir y
1015/24 Reid Lind
10/5/24 Lea Lind
10/5/24 MERCY DAQUIN
10/5/24 BENTE JOAQUIN Bf
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/1/24 Darien Dellon Daren Dellera
197124 Manish Saroya
10 724 ANSHUMAN LAZL
10/7/24 LAURIE LINDRUP
14abg Ashck Shammytem Ashlishar
197/24
10/7/24 Jose 1. Torres frets pare safet
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne Pl, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/3 Pripa: Subramanian
10/3 BAJI SHANKAR Saran
10/3 chaudra Subramania chander
10/6 tuer Baronsin kau arion
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
10/02 Rejesh vattipelli Rajen.
10/02 Samathe Guduru G. Samathe
10\02 Rahit Nain
Petition Objection to proposed "Route A" of SVP NRS-KRS 115KV Overhead Power Transmission line project impacting Background 1000+ families & small businesses along Lafayette St, Wilcox Ave, Payne PI, Kingsbury Cir, Bassett St, Duane Ave. Even underground option does not mitigate cancer & health risks from high Electromagnetic Fields (EMF) Resident We are petitioning to adopt "Route C" proposed in initial study of the project and or build over existing view & transmission lines; we do not want to see more overhead lines. Residents refuse to be forced to live 24x7 in demand close proximity to these power lines. We need Human Health Studies conducted which are currently acknowledged by SVP as out of scope of the project
Date Name Address Signature
82 10/1/20y KANISHK SRIVASTArA
10/01/2024 SHANKAR V Shant