Cities Index.
Overall Corridor Concepts

City Council and Authorities Concurrent
October 22, 2024

Document
Overall Corridor Concepts
Meeting
October 22, 2024
Body
City Council and Authorities Concurrent
Original file
925 KB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

Corridor Concept A
De La Cruz Boulevard and Coleman Avenue Bike Planning Project Concept AJanuary 2024
San Jose Mineta
International Airport
Robert Ave
Mathew St
Central Expy
Brokaw Rd
Coleman Ave
Martin Ave
Reed St
Lafayette St
Benton Rd
El Camino Real
De La Cruz Blvd
Lewis St
Harrison St
Class IV Cycle Track
Class II Bike Lane
Rail Line
Caltrain Station
Signalized Intersection
Install Class IV Cycle Track
Two-Way Cycle Track
City Limits
Existing
Install Two-Way Cycle Track
Transition between two-way/
one-way bicycle facilities
Planned
Existing and Planned Bikeways
Legend
0’ 1000’ 2000’
See Tri-Level Detail for constraints and considerations.

N
Consider bicycle signals. Enhance
bicycle connection with Ewert Road.

Consider bicycle signals.

Consider bicycle signals and/or
protected intersection features.

Remove on-street
parking along west side.

Implement protected intersection
features to transition people biking from
the two-way cycle track to the one-way
Class IV cycle tracks, and vice versa.

Implement Class IV two-way cycle track along
the eastern side of Coleman Avenue. Consider
roadway signage and striping to help notify
drivers of two-way bicycle traffic.

Reduce width of travel lanes and two-way
left-turn lane. Remove parking on west side of
street and use parking on the east side of the
street to protect the proposed cycle track.

Kimley>>>Horn
/
/
0 City of
Santa C'lara,
•• •
Corridor Concept B
De La Cruz Boulevard and Coleman Avenue Bike Planning Project Concept BJanuary 2024
San Jose Mineta
International Airport
See Tri-Level Detail for constraints and considerations.

Coleman Ave
Martin Ave
Robert Ave
Mathew St
Reed St
Carl St
Benton Rd
De La Cruz Blvd
Central Expy
Lafayette St
Brokaw Rd
El Camino Real
Lewis St
Harrison St
Class IV Cycle Track
Class II Bike Lane
Rail Line
Caltrain Station
Signalized Intersection
Install Class IV Cycle Track
Two-Way Cycle Track
City Limits
Existing
Install Two-Way Cycle Track
Transition between two-way/
one-way bicycle facilities
Planned
Existing and Planned Bikeways
Legend
Re-stripe section to reduce width
of existing two-way left-turn lane
0’ 1000’ 2000’ N
Implement protected intersection features to
transition cyclists from the two-way cycle track to
the one-way Class IV cycle tracks, and vice versa.

Install two-way Class IV cycle track on western
shoulder. Remove existing parking. Consider
roadway signage and striping to help notify
drivers of two-way bicycle traffic.

Reduce width of travel lanes and two-way
left-turn lane. Remove parking on west side of
street and use parking on the east side of the
street to protect the proposed cycle track.

Consider bicycle signals. Enhance
bicycle connection with Ewert Road.

Implement Class IV two-way cycle track along
the eastern side of Coleman Avenue. Consider
roadway signage and striping to help notify
drivers of two-way bicycle traffic.

Kimley>>>Horn
/
/
0 City of
Santa C'lara,
•• •

← All documents from this meeting