Resolution/Mission Point Project Rezone, Option B Page 1 of 5 Rev: 7/27/2023
RESOLUTION NO. 24-9398

A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA,

APPROVING A REZONING FROM HIGH -INTENSITY

OFFICE/RESEARCH AND DEVELOPMENT (HO -RD) TO

PLANNED DEVELOPMENT (PD) TO ALLOW A MIXED-USE
DEVELOPMENT, OPTION B, LOCATED AT 4995 PATRICK
HENRY DRIVE AND 3005 DEMOCRACY WAY, SANTA CLARA

PLN2018-13400 (Rezone)

WHEREAS, on October 17, 2017, Kylli, Inc., through its wholly -owned subsidiary Innovation Commons Owner, LLC (“Owner”) made an application for a General Plan Amendment (“GPA”) in connection with the redevelopment of a 48.6-acre site generally bounded by Tasman Drive, Patrick Henry Drive, Old Ironsides Drive, and the SFPUC Hetchy Hetchy Right of Way (APNs: 104-04-150, 104-04-142, 104-04-143, 104-04-151, 104-04-112, 104-04-113, 104-04-065, 104-04-111, 104-04- 064), which is currently developed with four light industrial buildings and a parking lot (“Project Site”);
WHEREAS, the Owner subsequently applied for a Planned Development (“PD”) Rezoning to redevelop the 48.6 acre site with up to 4,913,000 gross square feet of new development, including up to 1,800 units (approximately 1.8 million square feet of residential uses), up to 3 million square feet of office/research-and-development (“R&D”), approximately 100,000 square feet of retail, and approximately 10,000 square feet of childcare facilities ; a Vesting Tentative Subdivision Map to subdivide the property into five lots with up to three parcels for future parkland dedication and potential residential and commercial condominium purposes and to vacate Democracy Way; and a Development Agreement (collectively, along with the GPA, the “Project”), as shown on the Exhibit “PD Development Plans,” attached hereto and incorporated herein by this reference; WHEREAS, a rezone of the property to PD is required to allow creative development s tandards for site and building design, that are not otherwise allowed in standard zoning districts, to construct the proposed mixed-use development;
//
Resolution/Mission Point Project Rezone, Option B Page 2 of 5 Rev: 7/27/2023
WHEREAS, in conformance with CEQA, the Environmental Impact Report (“EIR”) prepared for the Project was noticed and circulated for a 45 -day public review period from November 17, 2023 to January 2, 2024;
WHEREAS, in addition to the Project, the EIR studied the Reduced Office/Increased Housing Alternative, which assumed the development of 800 multi-family housing units in Area C (for a total of up to 2,600 housing units for the entire Project) instead of approximately 789,000 gsf of office/R&D space, but otherwise maintained all other land use and developments assumptions of the Project;
WHEREAS, the City prepared a Final Environmental Impact Report (“FEIR”), including Attachment 3 to the FEIR analyzing the Office/R&D – Residential Flex option for the Planned Development zoning, which would permit development of up to 800 additional residential units in Area C (for a total of 2,600 units for the Project), or a mix of residential and office/R&D uses in Area C, with a corresponding reduction in square footage of office/R&D uses and a proportional increase in deed- restricted affordable residential units in Area C (“Revised Project”), as shown in Exhibit “PD Development Plans: Revised Project” to Resolution No. 24- 9398; WHEREAS, on November 6, 2024, the Planning Commission conducted a duly noticed public hearing to consider the proposed rezone, at the conclusion of which, the Planning Commission voted to recommend approval to the City Council;
WHEREAS, on November 7, 2024, notices of the November 19, 2024 public hearing were mailed to all property owners within one quarter -mile of the Project Site, according to the most recent assessor’s roll;
WHEREAS, on November 6, 2024, notice of the November 19, 2024 public hearing was published in the Santa Clara Weekly, a newspaper of general circulation for the City; and //
//
//
Resolution/Mission Point Project Rezone, Option B Page 3 of 5 Rev: 7/27/2023
WHEREAS, on November 19, 2024, the City Council held a public hearing to consider the proposed rezoning and related applications, at which time all interested persons were given an opportunity to provide testimony and the Council considered the information presented in the Staff Report, and all verbal and written evidence.

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. That the City Council hereby rezones the Project Site from High-Intensity Office/Research and Development (“HO -RD”) to Planned Development ( “PD”) to allow the development of the Revised Project, as shown on the attached PD Development Plans for the Revised Project and conditioned as specified in the attached Conditions of Rezoning Approval, incorporated herein by this reference.

3. Pursuant to SCCC Section 18.14 2.040, the City Council determines that the following findings exist in support of the rezoning:

A. The existing zoning is inappropriate or inequitable, in that the existing zoning for the Project Site does not allow for mixed-use development. A PD zoning of the Project Site to allow mixed-use development would implement the General Plan’s Land Use and Housing goals and policies to provide housing in proximity to existing residential, neighborhood and community commercial uses, support services, local and regional transit facilities, outdoor open space and recreation areas.
//
//
//
//
//
//
Resolution/Mission Point Project Rezone, Option B Page 4 of 5 Rev: 7/27/2023
B. The proposed zone change will conserve property values, protect or improve the existing character and stability of the area in question, and will promote the orderly and beneficial development of such area, in that the Project would redevelop underutilized industrial parcels to provide housing and commercial opportunities for the north Santa Clara Area, which support the City’s Housing Goals and assist the City in achieving Regional Housing Needs Allocation (“RHNA”) targets for production of affordable housing units as mandated by the State, and in accordance with the City’s Affordable Housing ordinance.

C. The proposed zone change is required by public necessity, public convenience, or the general welfare of the City in that the proposed zone change would allow for high density mixed- use development, public parkland, private open space, and community use. Construction of the Revised Project would contribute to the City’s housing inventory and would assist in production of housing units to achieve RHNA targets as mandated by the State.

D. The proposed zone change would allow imaginative planning and design concepts to be utilized that would otherwise be restricted in other zoning districts , in that the proposed zone change would allow flexibility in the development standards such as increased building height and reduced building setbacks, in order to provide high density uses with private and rooftop common open space, and also provide community uses.
//
//
//
//
//
//
//
//
//

4. That based on the findings set forth in this resolution and the evidence in the City Staff Report, EIR and MMRP, the City Council hereby rezones the Project Site to allow redevelopment of the 48.6 acre site with up to 4,913,000 gross square feet of new development, including up to 2,600 units (up to 1,800 units in area D, approximately 1.8 million square feet of residential uses), and up to 800 units in Area C with corresponding reduction in office/R&D uses in Area C), up to three million square feet of office/research-and-development (R&D), approximately 100,000 square feet of retail, and approximately 10,000 square feet of childcare facilities, as shown on the attached PD Development Plans for the Revised Project and conditioned as specified in the attached Conditions of Rezoning Approval for the Revised Project.

5. Effective date. This resolution shall become effective immediately.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 19TH DAY OF NOVEMBER, 2024, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

Attachments incorporated by reference:

1. Rezone Conditions of Approval - Revised Project

2. PD Development Plans - Revised Project
Resolution/Mission Point Project Rezone, Option B
Rev: 7/27/2023
Becker, Chahal, Hardy, Jain, Park, and Watanabe,
and Mayor Gillmor
None
None
None
~
ATTEST:

NORAPIMENffi,MM

ASSISTANT CITY CLERK

CITY OF SANTA CLARA

Page 5 of 5 ends

CC Date: November 19, 2024 Page 1
Conditions of Planned Development Rezoning Approval (Option B – Revised Project) PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way Project Description: Planned Development Rezoning Rezone to PD, and Architectural Review for the proposed Mission Point project including up to 3,000,000 sf of office, 100,000 sf of retail, 2,600 housing units (including up to 1,800 housing units in Area D and, with a corresponding reduction to office/R&D uses in Area C, up to 800 housing units in Area C) on a 48-acre site.

GENERAL
G1. Effective Date. This Permit shall only become effective at such time as the General Plan Amendment, PD Zoning, and Development Agreement have been adopted by the Decision-making body and have taken effect.

G2. Conformance with Plans. Prior to the issuance of Building Permit, the development of the site and all associate improvements shall conform to the approved plans on file with the Community Development Department, Planning Division. No change to the plans will be made without prior review by the Planning Division through approval of a Minor Amendment or through an Architectural Review, at the discretion of the Director of Community Development or designee. Each change shall be identified and justified in writing.

G3. Conditions on Plans. All conditions of approval for this Permit shall be reprinted and included within the first three sheets of the building permit plan sets submitted for review and approval. At all times these conditions of approval shall be on all grading and construction plans kept on the project site.

G4. Necessary Relocation of Public Facility. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.

G5. Indemnify and Hold Harmless. The owner or designee agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorney’s fees, injuries, costs, and liabilities from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of owner or designee’s project.

G6. Code Compliance. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis; proposed use and occupancy of all spaces (CBC Ch. 3), all building heights and areas (CBC Ch. 5), all proposed types of construction (CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (CBC Ch. 7), all proposed interior finishes fire resistance (CBC Ch. 8), all fire protection systems proposed (CBC Ch. 9), and all means of egress proposed (CBC Ch. 10). Noncombustible exterior wall, floor, and roof finishes are strongly encouraged.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 2

a. During construction retaining a single company to install all fire related penetrations is highly recommended.
b. The grade level lobbies shall be minimum 1-hour rated all sides and above. c. All stair shafts shall be minimum 1-hour rated.
d. All elevator shafts shall be minimum 1-hour rated.
e. All trash chute shafts shall be minimum 1-hour rated. f. Recommendation: provide minimum two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room. g. Any trash rooms shall be minimum 1-hour rated all sides and above.

G7. Building Codes as Amended. See Title 15 of the Santa Clara City Code for any amendments to the California Building Codes.

G8. Reach Codes. This project is subject to the provisions of the City of Santa Clara 2022 Reach Code, effective January 2022. See Ordinance No. 2034 and/or Title 15 of the Santa Clara City Code.
h. Chapter 15.36 – Energy Code for “all electric” provisions for new construction. i. Chapter 15. 38 – Green Building Code for additional Electric Vehicle Charging requirements for new construction.

G9. Comply with all applicable codes, regulations, ordinances and resolutions.

G10. The City encourages the Owner and any contractors or subcontractors working on the project to evaluate hiring local labor, hiring from or contributing to approved, accredited apprenticeship programs, increasing resources for labor compliance, and providing living wages during the development of this Project.

COMMUNITY DEVELOPMENT – PLANNING DIVISION
DESIGN / PERFORMANCE– PRIOR TO BUILDING PERMIT ISSUANCE P1. Roof Mounted Mechanical Equipment. All roof mounted mechanical equipment shall be placed within a screened roof top enclosure depicted on the elevation drawings or located below the parapet level and shall not be visible from the ground at any distance from the building. Cross section roof drawings shall be provided at the building permit stage indicating the relative height of the screen wall or parapet. Minimum screen height or parapet depth shall be five feet or greater to match the height of any proposed equipment.

P2. Tree Replacement (on-site). Protected trees permitted by the City for removal shall be replaced on-site at a 2:1 ratio for 24-inch box trees, 4:1 for 15-gallon trees, or 1:1 for dead trees. (SCC 12.35.090).

P3. Construction Management Plan. The owner or designee shall submit a construction management plan addressing impacts to the public during construction activities including:
showing work hours, noticing of affected businesses, construction signage, noise control, storm water pollution pr evention, job trailer location, contractor parking, parking enforcement, truck hauling routes, staging, concrete pours, crane lifts, scaffolding, materials storage, pedestrian safety, and traffic control. The plan shall be submitted to the Director of Community Development or designee for approval prior to issuance of demolition and building permits.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 3

DURING CONSTRUCTION
P4. Construction Hours. Construction activity shall be limited to the hours of 7:00 a.m. to 6:00 p.m. weekdays and 9:00 a.m. to 6:00 p.m. Saturdays for projects within 300 feet of a residential use and shall not be allowed on recognized State and Federal holidays.

Construction activities occurring outside of the City’s allowed construction hours would need to comply with the City’s exterior noise limits per Section 9.10.040 of the City Code.

P5. Construction Trash/Debris. During construction activities, the owner or designee is responsible for collection and pick -up of all trash and debris on -site and adjacent public right-of-way.

P6. Landscape Water Conservation. The owner or designee shall ensure that landscaping installation meets City water conservation criteria in a manner acceptable to the Director of Community Development.

OPERATIONAL CONDITIONS
P7. Landscaping Installation & Maintenance. The owner or designee shall ensure that the landscaping installed and accepted with this project shall be maintained on the site as per the approved plans. Any alteration or modification to the landscaping shall not be permitted unless otherwise approved by the Director of Community Development.

P8. Landscaping. The owner or designee shall maintain the front yard landscaping between the house and sidewalk. New landscape areas of 500 square feet or more or rehabilitated landscape of 2,500 square feet or more shall conform to the California Department of Water Efficient Landscape Ordinance.

P9. Transportation Demand Management (TDM) Program (Non-Residential Project). The owner or designee shall implement the project TDM program that includes elements to reduce vehicle miles traveled (VMT) by 25 percent in the aggregate per the City’s 2022 Climate Action Plan. A final TDM plan shall be submitted to the Director of Community Development or designee prior to Building Permit Final by the Planning Division. The property owner or designee shall monitor the project TDM program and submit an annual report to the Director of Community Development or designee. Monitoring and reporting requirements may be revised in the future if the minimum reduction is not achieved through the measures and programs initially implemented.

P10. Transportation Demand Management (TDM) Program (Residential Project). The owner or designee shall implement the project TDM program that includes elements to reduce vehicle miles traveled (VMT) by 20 percent with 10% through active TDM measures in the aggregate at full build out per the City’s 2022 Climate Action Plan. A final TDM plan shall be submitted to the Director of Community Development or designee prior to Building Permit Final by the Planning Division. The property owner or designee shall monitor the project TDM program and submit an annual report to the Director of Community Development or designee. Monitoring and reporting requirements may be revised in the future if the minimum reduction is not achieved through the measures and programs initially implemented.

P11. Transportation Management Association (TMA). At any time after building permits have been issued for the Project and w ithin two years of the formation of a TMA for the North Santa Clara area (comprising neighborhoods north of Highway 101) led by property Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 4

owners that are pursuing specific development proposals within the area, employers or other entities, join the TMA and pay a prorata share of TMA operational costs. The main purpose of the TMA is to fund and operate the local shuttle service or micro- transit solution, and may help to implement, coordinate and manage VMT-reduction programs as determined appropriate by the TMA members, between multiple properties and lead information and marketing campaigns to support behavior change.

MITIGATION MEASURES
P12. Mitigation Monitoring and Reporting Program. The Mitigation Monitoring and Reporting Program (MMRP), prepared for this project in compliance with the California Environmental Quality Act (CEQA), shall be incorporated by reference as conditions of approval. The applicant shall comply with all specified mitigation measures in the timelines outlined in the project’s MMRP.

COMMUNITY DEVELOPMENT - BUILDING DIVISION

DESIGN / PERFORMANCE– PRIOR TO BUILDING PERMIT ISSUANCE BD1. Addressing. Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review.

Please note city staff policy that existing site addresses typically are retired. Provide digital pdf printed from design software, not scanned from printed paper sheet. a. Any building or structure that is demolished shall have its address retired and a new address/s shall be issued for the project.

BD2. Flood Zone. The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map: https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code.
a. FEMA Flood Zone map designations and requirements are based on the map in effect at date of Building Permit issuance.

BD3. Water Pollution Control. The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp- w2k.com/nd_wp.shtml. All projects that disturb more than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP): http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD). All site drainage and grading permit applications submitted to the Santa Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 5

Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page:
• https://www.santaclaraca.gov/our-city/departments-g-z/public- works/environmental-programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.

BD4. Submittal Requirements. The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on -site field superintendent(s). The meeting will not be held without the attendance of the on -site field superintendent(s). The on- site grading permit shall be a separate permit application to the Building Division.

DURING CONSTRUCTION
BD5. Temporary Certificates of Occupancy. Temporary Certificates of Occupancy (TCO) will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, P.W./ Engineering, Fire Prev., Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.

COMMUNITY DEVELOPMENT - HOUSING DIVISION

H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the following affordable housing requirements and impact fee:

The requirement for the for-sale residential and rental residential development is as follows:
(a)Unless the City Council approves an alternate method of compliance pursuant to section (b) below, the Applicant shall provide not less than fifteen percent (15%) of the proposed units to affordable households made available at affordable housing cost or affordable rent to extremely low, very low, low and/or moderate-income households so long as the distribution of affordable units averages to a maximum of 100 percent Area Median Income. Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement (AHA) with the City that will determine the affordable rents and apply all terms and covenants guaranteeing the prescribed affordability, to the satisfaction of the Director of Community Development. There will be a fee for the AHA preparation in the amount of $5,868 rental development and $4,205 for for-sale development, that will be due prior to execution of the AHA. Additionally, there is an annual monitoring fee per affordable rental unit in the amount $127.

Payment of an Impact Fee for nonresidential development based on the square footage of the proposed project. The current impact fees for an Office building greater than Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 6

20,000 square foot shall have an impact fee of $28.79 per sf and Retail shall have an impact fee of $7.20 per sf.

Please note all fees are based on the current Municipal Fee Schedule in effect at the time the project is approved and must be paid prior to the issuance of the occupancy certificate of the building.

(b)In the alternative, the City Council may, in its sole discretion, authorize the Applicant to utilize an alternate means of compliance pursuant to SCCC § 17.40.080(g) through the execution of a development agreement. In order to utilize such an alternative, such Development Agreement must be fully executed prior to issuance of Building Permits. If no Development Agreement has been executed at the time Building Permits are issued, then section (a) above shall apply.

FIRE DEPARTMENT

DESIGN / PERFORMANCE—PRIOR TO BUILDING PERMIT ISSUANCE
F1. Hazmat Clearance. Prior to any Building Permit issuance, Hazardous Materials Closure (HMCP) is required as applicable:  This is a permit is issued by the Santa Clara Fire Department, Fire Prevention & Hazardous Materials Division.  Hazardous materials closure plans are required for businesses that used, handled or stored hazardous materials.  While required prior to closing a business this is not always done by the business owner, and therefore should be part of the developer’s due diligence.  The hazardous materials closure plans demonstrate that hazardous materials which were stored, dispensed, handled or used in the facility/business are safely transported, disposed of or reused in a manner that eliminates any threat to public health and environment.

F2. Hazmat Clearance. Prior to any Building Permit Issuance, a Phase II environmental assessment is required to be submitted to CRRD for review. If hazards are present that require site mitigation, cleanup, or management of chemical contaminants in soil, soil vapor, or groundwater a separate permit from one of the regulatory agencies below will be required. The type and extent of contamination on site(s) will govern which of the regulatory agencies noted below can supervise the cleanup: Department of Toxic Substances Control (DTSC); State Water Resources Control Board; or Santa Clara County, Department of Environmental Health.

If the project intends to contract with a State or County Agency for onsite/offsite environmental remediation activities the following documentation shall be provided to the Fire Prevention & Hazardous Materials Division prior to issuance of a Building Per mit for demolition or grading: Oversight agency case number; and Oversight mangers contact name, phone number.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 7

For smaller projects that are not moving soil at all, a Phase I environmental assessment may be adequate. Please contact Assistant Fire Marshal Fred Chun at [email protected] for more information.

F3. Fire Flow Requirement. Prior to Building Permit Issuance, provide documentation from the City of Santa Clara Water & Sewer Department that the minimum required fire -flow can be met. Fire Department fire -flow will be based on the current California Fire Code and local ordinance. The most restrictive departments requirement shall apply.

F4. Fire Hydrants. Prior to Building Permit Issuance, building plans shall show the required number, location and distribution of fire hydrants for the buildings will be based on the current California Fire Code, Appendix C as amended. The required number of fire hydrants will be based on the fire-flow before the reduction for fire sprinklers. Both public and private fire hydrants may be required.

F5. Fire Department Access. Prior to Building Permit Issuance, a five -foot all -weather perimeter pathway around the entire perimeter of the buildings to facilitate firefighter access is required to be incorporated into the Building permit submittal.

F6. Fire Department Access. Prior to the issuance of the Building Permit, approval for fire department apparatus access roads is required. Roadways must be provided to comply with all the following requirements:

F7. Fire apparatus access roadways shall be provided so that the exterior walls of the first story of the buildings are located not more than 150 feet from fire apparatus access as measured by an approved route around the exterior of each building. In addition, aerial apparatus roadways must be located so aerial apparatus will have clear access to the “entire” face/sides of the building. The minimum number of sides is project -specific and depends on the building configuration, building design, occupancy, and construction type, etc. As part of Building Permit Issuance, an alternative materials, design, and methods of construction and equipment permit application will need to be submitted for review and approval incorporating applicable mitigation measures as dete rmined by the fire department for the lack of compliance. Please note acceptable mitigation methods may have been discussed during the planning stage. Those mitigations are not guaranteed until a formal alternate means permit is submitted concurrently with the Building Plans.

Conversely, an acceptable mitigation method may not have been discussed and will be evaluated under an alternate means permit at the building permit stage.

• For underpasses, garages, gates, or anything similar that a Fire apparatus is required to drive under as part of the emergency vehicle access, 16 feet vertical clearance will be required. For all other areas, the “minimum” unobstructed vertical clearance s hall not be less than 13 feet 6 inches.

or

• For all other areas, the “minimum” unobstructed vertical clearance shall not be less than 13 feet 6 inches.

• The “minimum” width of aerial roadways for aerial apparatus is 26 feet.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 8

• The minimum inside turning radius shall be 30 feet.

• The “minimum” width of roadways for aerial apparatus is 26 feet. Aerial access roadways shall be located a minimum of 15 feet and a maximum of 30 feet from the protected building. This requirement is only applicable when Appendix D of the Fire Code is enforceable.

• Overhead utility and power lines easements shall not be located over fire apparatus access roads or between the aerial fire apparatus roads and the buildings to avoid the possibility of injury and equipment damage from electrical hazards.

• Fire apparatus access roadways shall be all -weather surface(s) designed to support a gross vehicle weight of 75,000-pounds.

• Trees at full development must not exceed 30 feet in height and not impair aerials apparatus operations to sweep opposing sides of a building. Other obstructions such as site lighting, bio -retention, and architectural features are reviewed case- by-case to ensure they do not obstruct aerial and ground ladder access.

• Traffic control/calming devices are not permitted on any designated fire access roadway unless approved. A separate Fire Department permit is required for any barrier devices installed alone fire department apparatus access roads.

Prior to any Building Department Issuance, all fire department apparatus access roadways on private property are r equired to “be recorded” with the County of Santa Clara as Emergency Vehicle Access Easements (EVAE’s) and reviewed by the Fire Department.

No other instruments will be considered as substitutions such as P.U.E, Ingress/Egress easements and/or City Right-of-Ways.

F8. Emergency Responder Radio Coverage System. Prior to Building Permit Issuance, provisions shall be made for Emergency Responder Radio Coverage System (ERRCS) equipment, including but not limited to pathway survivability in accordance with Santa Clara Emergency Responder Radio Coverage System Standard.

F9. Fire Department Access. Prior to the start of construction, roadways and water supplies for fire protection are required to be installed and made serviceable and maintained throughout the course of construction.

F10. Fire Department Access. Prior to issuance of the Building Permit, a gate permit is required to obtained. Openings for access gates located across fire apparatus access roads shall be a minimum of 20 feet of clear width. Gates shall also be provided with a minimum unobstructed vertical clearance of 16-feet. All gates installed on designated fire department access roads must be electrically automatic powered gates. Gates shall be provided with an emergency power or be of a fail -safe design, allowing the gate to be pushed open without the use of special knowledge or equipment. A Tomar Strobe Switch or 3M Opticom detector shall be installed to control the automatic gate(s) to allow Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 9

emergency vehicles (e.g., fire, police, ems). Said device shall be mounted at a minimum height of eight to ten feet (8’ - 10’) above grade.

F11. Alternative Means and Methods. Prior to any Building Permit issuance, an alternate means or methods permits to mitigate any code deficiency must be submitted and approved. Please submit this permit concurrently with the building plans. Please note specific mitigations may have been discussed during the planning process. None of these discussions are binding and can only be formally approved through submitting an AMMR permit. The AMMR permit is formally documenting that and still needs to be submitted.

F12. Hazmat Information. Prior to Building Permit Issuance, a Hazardous Materials Inventory Statement including refrigerants is required to be submitted and reviewed with the Building Permit if applicable.

F13. Fire Safety During Construction and Phased Occupancy. Prior to Building Permit Issuance, a permit for Construction Safety & Demolition shall be submitted to the fire department for review and approval in compliance with our Construction Safety & Demolition standard. Any phased occupancy will require a separate fire department permit.

DURING CONSTRUCTION
F14. Shared Fire Protection Features that Cross Property Lines. Prior to Building Permit Final, any EVAEs or fire protection equipment (including but not limited to fire service undergrounds, sprinkler piping, fire alarm equipment, fire pumps, ERRCS) that cross property lines or is not located on the parcel of the buil ding it serves shall have a CC&R legally recorded detailing who is responsible for maintenance and repair of the EVAE or fire protection equipment.

F15. Fire Protection Systems Before Occupancy. Prior to any Certificate of Occupancy Issuance (temporary or permanent), fire- life safety systems installations must be fully installed, functional, and approved.

PARKS & RECREATION DEPARTMENT
PR1. This Project is a subdivision, and the Quimby Act provisions will apply. The project will generate an estimated 6,240 residents (2.4 persons/household x 2600 units). Based on the Quimby standard of 3.0 acres/1000 residents, the amount of public parkland required for this Project to mitigate the impact of the new resident demand is approximately

18.72-acres. The equivalent fee due in lieu of parkland dedication is $124,355,400.

PR2. Stormwater management for public parks and privately owned areas shall be separate and distinct– public areas shall not be used for private requirements and private areas shall not be used for public requirements.

PR3. Any in lieu fees imposed under this Chapter shall be due and payable to the City prior to issuance of a building permit for each dwelling unit.

PR4. Final calculations will depend upon the actual number and type of units and the mix of parkland dedicated and remaining fee due, at the discretion of the City.

PR5. Developer to present updated conceptual park plans at a future Parks & Recreation Commission (PRC) meeting for Commission and community input on the updated proposed park plan. Park plans as proposed are a conceptual plan.

PR6. The final Commission recommended, and Council approved, public park design will require review and approval of park construction plans by all City departments through Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 10

the City’s online permitting portal (Accela). A separate permit will be issued for the park construction.

PR7. Developer to enter into a Park Improvement Agreement with the City which will be submitted to Council for approval and then recorded with the County before park construction begins.

PR8. Developer to enter into a Park Maintenance Agreement with the City which will be submitted to Council for approval and then recorded with the County before park construction begins. Developer to maintain public parkland in perpetuity is the preferred method for park maintenance.

PR9. The park shall be dedicated to City in fee title and should be free of all encumbrances.

PR10. When the park construction is completed, developer to provide City with GIS/Enterprise Asset Management System (EAMS) data (CAD file) for the public park. The base map and design elements/assets should meet the City data dictionary definitions for each asset.

PR11. There should be a minimum 10-foot set-back between the public park and the private buildings. The public will need access to the private buildings without walking through the public park. The access and outdoor space for the private building shall not be included in the calculation for the public park and shall not be within the public park parcel.

PR12. The public park must be programmed and constructed to the “Park Amenity & Design Standards” and City standards.

PR13. Follow City guidelines to service domestic water, recycled water, and electricity for the public park – lines should not cross between the public park and the private development.

PR14. Flood zone/FEMA designation information shall be taken into consideration with the design of the public parkland.

PR15. Reduce the pedestrian network areas crossing through the park – less hardscape and more area for recreation.

PR16. There is a distinction between open space and public parkland – these separate and distinct areas should be identified on the plan sheets with the correct labels.

PR17. Application for Private Recreation Amenity Credit. a. According to City Code Section 17.35.070, a developer may submit a written request with the project application for a credit against the amount of parkland dedication or the amount of the in-lieu fee thereof.
b. Eligible on-site private park and recreation amenities shall be dedicated to Active Recreational Uses provided all requirements of Chapter 17.35 are met and provided such amenities are found to be in the public interest.

PR18. All residents shall have access to all amenities and all podium courtyards. If something else is intended, notify this Department to check for any effect on calculations.

PR19. The children’s play area, for the public park and for the private amenity area, shall have separate areas serving ages 2-5 and 6-12 that include the six + one elements of play (climbing, balancing, spinning, brachiating, swinging, sliding, and running/free play/imagination) – see sample table below that will need to be submitted with park design plans. Equipment for one age group should be adjacent to the equipment for the other age group.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 11

PR20. Applicant to provide plan sheets with details on any proposed public parkland and private, on-site recreational amenity areas. Include an itemized list in a table format of what is contained in each area (i.e., number of BBQ grills, number of tables, description of the proposed agricultural and medicinal planting, required setbacks, etc.). Sample table shown here is to be used as an example and is not to be considered all inclusive:

SPACE/LOCATION ELEMENT LISTED IN CITY
CODE
TOTAL AREA – SQUARE
FEET
Recreation Rm – 1st
Floor
Element #8 xxx square feet
Roof Deck Community
Garden
Element #4 xxx square feet - excludes x
sq. ft. for 4 ft. perimeter
setback
Family Picnic Area – 8th
Floor
Element #5 000 square feet – excludes
x sq. ft. for 4 ft. perimeter
setback
Sport Court – ground
floor
Element #6 xxx square feet

PR21. Dwelling Unit Tax. According to City Code Chapter 3.15, a dwelling unit tax is also due based upon the number of units and additional bedrooms. The unit mix is required to calculate the amount due.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 12

PR22. Calculations may change if the number of units change, if any areas do not conform to the Ordinance and City Code Chapter 17.35, and/or if the fee schedule for new residential development fees due in lieu of parkland dedication changes before this Project is deemed complete by Planning.

POLICE DEPARTMENT
None.

PUBLIC WORKS DEPARTMENT - ENGINEERING

DESIGN—PRIOR TO BUILDING PERMIT ISSUANCE
E1. Site Clearance. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees.

Other requirements may be identified for compliance during the site clearance process.

Contact Public Works Department at (408) 615-3000 for further information.

E2. Site Clearance. The sanitary sewer (SS) discharge information (i.e., building use, square footage, point of connection to the public system, and 24-hour average and peak SS flow graphs for the peak day, showing average daily and peak daily SS flows) submitted by the developer was added to the City’s Sanitary Sewer Hydraulic Model (SSHM) to determine if there is enough SS conveyance capacity in the SS trunk system to accommodate the proposed development. The SSHM output indicates that there should be enough SS conveyance capacity to accommodate the proposed development. The SSHM output may change based on pending development applications and future projects. The SSHM output does not guarantee or in any way reserve or hold SS conveyance capacity until developer has Final Approval for the project. For purposes of this condition, “Final Approval” shall mean the final vote of the City Council necessary for all entitlements to be approved, unless a legal challenge is brought to the Council decisions, in which case the Final Approval shall mean the final disposition of the legal challenge.

E3. Easement. Obtain City Council approval of a resolution ordering vacation of existing public easement(s) , including the vacation of Democracy Way, proposed to be abandoned, if any, through Public Works Department, and pay all appropriate fees, prior to start of construction. Vacation of Democracy Way is subject to the sale of the City’s easement rights as detailed in the Project’s Development Agreement.

E4. Subdivision Map. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.

E5. Encroachment Permit. Developer shall complete the relocation of utilities within Democracy Way prior to City Council approval of a resolution ordering the vacation of Democracy Way street right-of-way and prior to recordation of the Final Map.

E6. Subdivision Map. If and when required per SVP requirements , pay appropriate fee through Public Works Department to initiate the processing of a Grant Deed or easement document, per SVP requirements, for dedication of electric substation to the City.

E7. Site Clearance. Applicant shall pay fair share fees as identified in the TIA.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 13

DURING CONSTRUCTION
E8. Encroachment Permit. All work within the public right -of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E9. Encroachment Permit. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.

E10. Encroachment Permit. Coordinate construction of utilities near Old Glory Lane and Old Ironsides Drive with developer(s) in the Patrick Henry Drive Specific Plan if construction timelines coincide.

E11. Encroachment Permit. Route sanitary sewer discharge to avoid Tasman lift station.

Utilize existing sewer main at Old Glory Lane and Old Ironsides Drive.

E12. Encroachment Permit. Existing non- standard or non -ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E13. Encroachment Permit. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.

E14. Encroachment Permit. Owner or designee shall provide a complete storm drain study for the 10-year and 100-year storm events. The grading plans shall include the overland release for the 100 -year storm event and any localized flooding areas. System improvements, if needed, will be at developer’s expense.

E15. Encroachment Permit. Sanitary sewer and storm drain mains and laterals shall be outside the drip line of mature trees or ten (10) feet clear of the tree trunk, whichever is greater, to the satisfaction of the City Engineer.

E16. Encroachment Permit. Provide root barriers when the drip line of the mature trees covers the sidewalk. Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barriers for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.

E17. Encroachment Permit. For proposed sanitary sewer laterals 8” and greater, connect to existing manholes. For proposed 6” sanitary sewer laterals, use “Tap -Tite” connections.

Property line manholes/clean-outs are required.

E18. Encroachment Permit. Existing streetlights shall be clear of proposed sidewalk, developer shall relocate as necessary.

E19. Encroachment Permit. Maintain required vertical height clearance from top of pavement to bottom of skybridge per Santa Clara Fire Department.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 14

E20. Easement. Dedicate required on- site easements per phase for any new public utilities, and/or emergency vehicle access by means of subdivision map or approved instrument prior to request for certificate of occupancy.

E21. Easement. Dedicate sidewalk easements along the project frontage where public sidewalks extend into private property. Sidewalk easements are to be 1’ behind proposed back of walk where there is landscaping behind sidewalk. Sidewalk easement where hardscape is behind sidewalk is to be at back-of-walk. Cold joint is required between public sidewalk and private hardscape.

E22. Agreement. Execute easement/right -of-way encroachment agreement for proposed private utilities within public easements/right -of-way. Record release of interest for easement/right-of-way encroachment agreements when no longer needed.

E23. Agreement. Execute release of interest for public right-of-way encroachment agreements and remove PVC conduits crossing Democracy Way (SC 15,643) and Patrick Henry Drive (SC 15,727).

E24. Agreement. If requested, owner or designee shall prepare and submit for City approval a maintenance plan for all sidewalk, curb and gutter, landscaping and irrigation system improvements installed within the public right -of-way prior to encroachment permit issuance. Such plan shall include at a minimum, maintenance requirements for trees and shrubs, in acknowledgement of developer’s/property owner’s obligation under Chapter

12.30 and 17.15.

E25. Encroachment Permit. Pavement treatment for portions of roadway frontage with proposed utility work prior to parcel development construction shall be slurry sealed with digouts in the interim. Final pavement treatment shall be per condition E26 below.

E26. Encroachment Permit. In conjunction with installation of off-site improvements, the entire width of Old Ironsides Drive and Patrick Henry Drive, and half width of Tasman Drive shall be 2” grind and overlay with dig outs.

E27. Encroachment Permit. Applicant is required to implement all recommendations as identified in the TIA.

E28. Encroachment Permit. Replace all street signs and curb markings along the project frontage.

E29. Encroachment Permit. Implement Pedestrian Master Plan Policy 2.A.3, 2.A.4, and 2.C.3:

At the Tasman/Patrick Henry intersection, modify traffic signal by replacing existing Type 1 poles with Type 15TS poles (northwest, southeast, and southwest corners) and reduce curb radius on southeast corner of the intersection to 25’ or mutually agreed upon radius to support turning movements ( SE corner of the intersection is part of Kylli’s project frontage). Modify intersection striping to install setback stop lines on all approaches.

E30. Encroachment Permit. Implement Pedestrian Master Plan Policy 2.A.3, 2.A.4, and 2.C.3:

At the Tasman/Old Ironsides intersection, modify traffic signal by: replacing existing Type 1 pole with Type 15TS pole (northwest, southeast, northeast, and southwest corners) and reduce curb radius on southwest corner of the intersection to 25’ or mutually agreed upon radius to support turning movements (SW corner of the intersection is part of Kylli’s project frontage).Modify intersection striping to install setback stop lines on all approaches.

E31. Encroachment Permit. Implement Pedestrian Master Plan Policy 2.A.3, 2.A.4, and 2.C.3:

Upon approval by SFPUC, at the Great America/Old Glory intersection, modify traffic Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 15

signal at southwest corner by replacing existing Type 1 pole with Type 15TS pole. Should SFPUC not approve any work within the southwest corner of the intersection, an equivalent improvement shall be provided to the City to the satisfaction of the City Engineer. In seeking SFPUC approval, the City will cooperate with the applicant to submit and process any SFPUC application for this work. The applicant will make commercially reasonable efforts to obtain SFPUC approval, but if the process takes more than a year from application submittal, applicant and City will meet and confer to determine the likelihood of success in the City Engineer’s reasonable discretion.

E32. Encroachment Permit. Design and construct minimum 5- foot sidewalks along Patrick Henry Drive, Tasman Drive, and Old Ironsides Drive.

E33. Encroachment Permit. Install bike friendly storm drain inlet grates on Patrick Henry Drive, Tasman Drive, and Old Ironsides Drive.

E34. Encroachment Permit. All new driveways shall use City Standard Detail ST-8.

E35. Encroachment Permit. All new intersections shall construction curb returns with minimum 25-foot curb radius and Case A curb ramp per Caltrans Standard Plan A88A per Pedestrian Master Plan Policy 2.A.4.

E36. Encroachment Permit. Provide lighting on private roads to meet or exceed latest American National Standard Institute (ANSI)/Illuminating Engineering Society (IES) standards per the Pedestrian Master Plan.

E37. Encroachment Permit. All new driveways and intersections must comply with City’s driveway triangle of safety requirements per City Standard Detail TR-9 E38. Encroachment Permit. On-street parking shall not be counted toward on- site parking requirements.

E39. Encroachment Permit. Applicant shall implement any improvements identified by VTA related to existing bus stops at three existing bus stops along the project frontage on Tasman Drive, Old Ironsides Drive, and Patrick Henry Drive.

E40. Encroachment Permit. Unused driveways in the public right -of-way shall be replaced with City standard curb, gutter, and sidewalk.

E41. Encroachment Permit. All traffic striping, messages and symbols shall be thermoplastic.

E42. Encroachment Permit. The project shall construct a 30- foot multi-purpose trail on the southern boundary of the project site between Patrick Henry Drive and Old Ironsides Drive. The trail shall include an approximately 12-foot landscape area on the north side of the trail. The trail shall include a 16- foot paved pathway with 2- foot shoulders. The trail shall include pedestrian- scale lighting to meet or exceed latest American National Standard Institute (ANSI)/Illuminating Engineering Society (IES) standards per the Pedestrian Master Plan.

E43. Encroachment Permit. On the east side of Patrick Henry Drive, between the future on - site multi- purpose trail and the future crosswalk and beacon on Patrick Henry Dive identified in the Patrick Henry Drive Specific Plan, construct an approximately 10-foot wide multi-purpose trail connection. Any deviation from the design shall be subject to approval by City Engineer. Should SFPUC not approve any work within Hetch-Hetchy right of way, applicant shall be responsible for constructing reasonable equivalent improvements in coordination with the City, to the satisfaction of the City Engineer. In seeking SFPUC approval, the City will cooperate with the applicant to submit and process any SFPUC Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 16

application for this work. The applicant will make commercially reasonable efforts to obtain SFPUC approval, but if the process takes more than a year from application submittal, applicant and City will meet and confer to determine the likelihood of success in the City Engineer’s reasonable discretion. The cost of these improvements (including the actual and reasonable costs to process SFPUC approval) will be credited towards traffic fair share line item #25, “Hetch Hetchy trail (between Guadalupe River Pkwy & Great America Pkwy & between Patrick Henry Dr & Calabazas Creek Trail)”.

E44. Encroachment Permit. Upon approval by SFPUC, on Old Glory Lane, between Old Ironsides Drive and Great America Parkway, construct an approximately 16 -foot wide multi-purpose trail on the south side of the roadway on City right -of-way to connect the new multi-purpose trail on Ky lli development to Great America Parkway. Any deviation from the design shall be subject to approval by City Engineer. The center median must be removed and reconstructed. Should SFPUC not approve any work within Hetch -Hetchy right of way, applicant shall be responsible for constructing equivalent improvements in coordination with the City, to the satisfaction of the City Engineer. In seeking SFPUC approval, the City will cooperate with the applicant to submit and process any SFPUC application for this work. The applicant will make commercially reasonable efforts to obtain SFPUC approval, but if the process takes more than a year f rom application submittal, applicant and City will meet and confer to determine the likelihood of success in the City Engineer’s reasonable discretion. The cost of these improvements (including the actual and reasonable costs to process SFPUC approval) will be credited towards traffic fair share line item #25, “Hetch Hetchy trail (between Guadalupe River Pkwy & Great America Pkwy & between Patrick Henry Dr & Calabazas Creek Trail)”.

E45. Encroachment Permit. On Tasman Drive, between City limits and Great America Parkway, restripe each direction of travel to include a minimum of a 5- foot Class II bike lane and two 11-foot vehicle lanes, any deviations subject to approval by City Engineer.

E46. Encroachment Permit. On Patrick Henry Drive, between Tasman Drive and the Patrick Henry Specific Plan boundary, construct a protected Class IV bike lane with bollards with two 8-foot bike lanes, two 10-foot vehicle lanes, and a 12-foot center two-way left turn lane to match the cross section within the approved Patrick Henry Drive Specific Plan. Any deviations to be approved by City Engineer.

E47. Encroachment Permit. On Old Ironsides Drive, between Tasman Drive and Old Glory Lane, construct a parking protected Class IV bike lane with two 8-foot bike lanes, two 10- foot vehicle lanes, and a 12-foot center two-way left turn lane to match the cross section within the approved Patrick Henry Drive Specific Plan. Any deviations to be approved by City Engineer.

E48. Encroachment Permit. Residential and Non- residential Class I bicycle parking spaces and Class II bicycle parking spaces shall be provided per the requirements in the adopted Santa Clara Zoning Code Update. Bicycle parking, as defined in Santa Clara Municipal Code 18.74.075, shall be conveniently accessible from the street, within 200 feet of a building entrance and/or highly visible area.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 17

STREETS DIVISION
General Condition: The Streets Division deems the Rezone and General Plan Amendment complete, however, the Streets Division will need to review and approve the architectural review for these individual projects to ensure that they meet right-of-way landscape, solid waste and stormwater requirements. The plans provided for the rezone and GPA only included overall conceptual plans, which is not enough detail for Streets to provide an appropriate review.

Right of Way Landscape

DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT L1. Include City of Santa Clara Tree Preservation/ City Arborist specifications on all improvement plans.

L2. Identify existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.

L3. 2:1 tree replacement ratio required for all trees removed from site.

DURING CONSTRUCTION OR OPERATION
L4. No cutting of any part of public , including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).

PRIOR TO FINAL OF BUILDING PERMIT
L5. If 2:1 replacement ratio cannot be met for removal of right of way landscape trees, tree planting fee must be paid prior to building permit final.

DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT SW1. The applicant shall complete and provide the Post-Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type. Contact the Public Works Department at [email protected] or (408) 615-3080 for more information.

SW2. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, trash enclosures and trash staging areas. The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines. Solid metal roof, gates and a trench drain shall be installed within the trash enclosure and connected to the on-site sewer system.

SW3. For projects that involve construction, demolition or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section 8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list. Applicant shall create a Waste Management Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 18

Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/.

SW4. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Insert the General Notes for the Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.

SW5. Project applicant shall contact the Public Works Department, Street Maintenance Division at (408) 615-3080 to verify if the property falls within the City’s exclusive franchise hauling area. If so, the applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.

DURING CONSTRUCTION OR OPERATION
SW6. Applicant to track all waste generated and upload debris tags to GreenHalo for City staff review.

PRIOR TO FINAL OF BUILDING PERMIT
SW7. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and construction activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required.

Stormwater

DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT ST1. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.

ST2. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter (on design) shall be submitted with the Plan.

ST3. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 19

ST4. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans.

Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans.

Applicant to add Source control measures with designations from C.3 stormwater handbook, Appendix H.

ST5. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.

ST 6. Include C.3 Stormwater Treatment Facilities Construction general notes on the improvement plans.

ST7. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.

ST8. For single-family homes and other small projects that create and/or replace 2,500 – 10,000 square feet of impervious surface area, the applicant shall implement at least one of the following site design measures:
a. Direction of roof runoff into cisterns or rain barrels b. Direction of roof, sidewalk, walkway, patio, driveway, or parking lot runoff onto vegetated areas
c. Construction of sidewalks, walkways, patios, bike lanes, driveways, and parking lots with permeable surfaces
Plans shall specify which site design measures are selected for the project and show the direction of flow from impervious surfaces to the selected site design measures. All measures shall meet the design criteria in the 2016 C.3. Stormwater Handbook, Appendix K: Standard Specifications for Lot-Scale Measures for Small Projects.

ST9. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST10. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST11. The use of architectural copper is prohibited.

DURING CONSTRUCTION OR OPERATION
ST12. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).

ST13. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 20

ST14. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.

ST15. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.

ST16. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.

PRIOR TO FINAL OF BUILDING PERMIT
ST17. As-Built drawing shall be submitted to the Public Works Department.

ST18. Applicant shall schedule and City shall conduct a final C.3 inspection.

ST10. Permeable Pavement, Media Filter vaults, Interceptor Trees and Trash Full Capture Devices shall be inspected by a third-party reviewer and/or manufacturer representative for conformance with the details and specifications. If necessary, percolation test shall be performed to ensure proper installation. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.

ST11. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Dept. - Environmental Services at (408) 615-3080 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter vaults and full trash capture devices is to be done annually by December 31 of each year.

SILICON VALLEY POWER
SVP1. Maximum substation size shall not exceed 225 feet (long) x 120 feet (wide). Final dimensions are to be finalized as part of the detailed design efforts.

SVP2. Project Electric Load less than or equal to 2.5 MVA Developer shall only be required to comply with this Part I of these Silicon Valley Power (SVP or Silicon Valley Power) conditions of approval; provided the projected electric load of the all phases of the project do not cumulatively exceed 2.5 MVA (as determined by Silicon Valley Power) (“2.5 MVA Threshold”). Silicon Valley Power will make the 2.5 MVA available for Developer’s use at the project site only after Silicon Valley Power has reasonably determined the condition of approval of this Part I have been met. This 2.5 MVA will be subject to the conditions of approval of Part II (including, but not limited to, additional analysis under a transmission system impact study and any new conditions resulting from that study) when projected electric load of the project (as determined by Silicon Valley Power) exceeds the 2.5 MVA Threshold.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 21

So long as Developer’s project is at or below the 2.5 MVA Threshold, Developer shall comply with all condition of approval of Part II, except for the following: EL1, EL2, EL15 and EL43. For this Part I only, EL 27 is amended that condition is amended to read as following: “Developer shall pay all Developer fees per the City of Santa Clara’s Municipal fee schedule for Electric fees.”

SVP3. Project Electric Load greater than 2.5 MVA
Developer shall comply with Part II of these Silicon Valley Power conditions of approval when the projected electric load of the project (as determined by Silicon Valley Power) exceeds the 2.5 MVA Threshold. Silicon Valley Power will make electric power available for Developer’s use at the project site only after Silicon Valley Power has reasonably determined the condition of approvals of this Part II have been met.

The amount and ramp rate will be set forth in a substation agreement or, if not applicable, a system impact study [Transmission and/or Distribution System] or such other study required by SVP.

Developer may seek an amendment of these conditions of approval when any of phase of the Project requires to undergo the City’s architectural review process; however, no amendment shall be authorized by the City without (1) the completion of a new system impact study [Transmission and/or Distribution System] (2) compliance with any additional SVP requirements as may be applicable at that time) for the applicable phase; and (2) SVP’s written approval. Any SVP-approved revisions of these conditions of approval will be based on the new system impact study [Transmission and/or Distribution System] and any other SVP requirements.

SVP4. Maximum substation size shall not exceed 225 feet (long) x 120 feet (wide). Final dimensions (within the maximum) are to be finalized as part of the detailed design efforts.

SVP5. Maximum substation parcel must be the final building dimensions plus a minimum of the 30 feet set back from the property line from the public ROW. All other property lines will have a 0’ setback.

SVP6. Silicon Valley Power (SVP) design of distribution trenches around the site may require additional manholes for cable pulling. Trenches require 5’ clearance on each side of the trench and the clearance/easement area cannot overlap with any bioretention areas, building foundations, trees, other utilities, etc.

SVP7. SVP design of services for each phase of the project will require an additional switch vault for any additional services. Each 12KV service can be loaded up to a maximum of

4.5MVA. The Applicant is to provide detailed demand loading for each phase/building to confirm the number of electric services required.

SVP8. SVP 12KV services cannot be paralleled and each service will require Applicant owned switchgear. Switchgear requires 10’ clearance on the side of cable termination with 18’ wide drive-up access from the nearest road. 5’ clearance is required on all other sides of the gear.

SVP9. Applicant owned 12KV switchgear cannot be located inside the building unless otherwise approved by SVP management in writing.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 22

SVP10. All SVP facilities should be 5’ clear of trees and per SD1235. The more stringent shall apply.

SVP11. All streetlighting, low voltage & fiber conduits, pull boxes, & foundations shall be designed during the detail design phase.

SVP12. Applicant shall install a new distribution trench at its sole cost and expense along Tasman Drive if the existing SVP trench conflicts with the newly proposed improvements. SVP shall relocate the existing wires to the new trench prior to abandoning the existing facilities. Once the existing facilities are abandoned the Applicant may install the newly proposed improvements and/or remove the abandoned SVP facilities.

SVP13. SVP distribution lines will require connection to existing infrastructure. Final design to be established during building permits.

SVP14. Applicant shall provide a thermal backfill for heat dissipation around SVP conduits around the site. The necessity of a thermal backfill and the specific backfill material shall be determined during the design phase.

SVP15. Distribution site design (downstream of substation 12KV switchgear) assumes standard SVP substructure & SVP owned equipment specifications will be used for the project. If SVP determines site conditions do not allow for standard substructure and equipment to be utilized, Applicant shall work with SVP to design and place non- standard substructure. Applicant shall be responsible for additional costs in material procurement for material provided and installed by SVP, which will be recovered from Applicant through fees determined at the building permit stage, if applicable. Standard substructure is defined in UG1000 standard. Standard material for SVP that may be affected includes cable sizes (standard sized are: 1100AL 15KV Triplex & 1/0 AL 15KV Triplex Cable).

SVP16. Bio-retention areas cannot be in front of the substation parcel or within any SVP easements.

SVP17. Unless expressly stated otherwise or covered by a fee to be paid by Applicant, Applicant shall be responsible for all costs and expenses associated with fulfilling these conditions of approval.

SVP18. Parking or additional occupied (storage, retail, residential, etc.) space shall not be placed above or below the substation. Alternative use of roof for additional green space may be allowed.

SVP19. Clearances: (Make sure job notes do not conflict with SVP clearance requirements).

Design deviations from stated clearances must be approved in advance by SVP in writing.
a. EQUIPMENT
i. Ten (10) foot minimum clearance is required in front of equipment access doors. (UG1000 sheet 11)
ii. Five (5) foot minimum clearance from pad is required on sides without equipment access doors. (UG1000 sheet 11)
iii. Eighteen (18) foot minimum width shall be provided and maintained on one side of the equipment pad to allow an electric dept. line truck to drive up next to the pad for installation and maintenance of equipment. (UG1000 Sheet 11).
iv. Barrier pipes are required only on sides accessible to vehicles. (UG1000 Sheet 12).

1. Thirty (30) inches from side of equipment sides.

2. Forty-Eight (48) inches in front of access doors.
a. Barrier Pipes in front of access doors shall be removable. b. CONDUITS
Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 23

i. Five (5) foot minimum longitudinal clearance between new conduits or piping systems (open trench installation) and any existing or proposed SVP conduit system. This is for longitudinal. (UG1250 sheet 5) ii. Twelve (12) inch minimum vertical clearance between new conduit/pipes installed perpendicular to existing SVP conduits for open trench installations. (UG1000 sheet 36, UG1250 Sheet 6)
iii. Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7) iv. Three (3) foot minimum clearance is required between signposts , barrier pipes or bollards, fence posts, and other similar structures. (UG1250 sheet 10).
v. Five (5) foot minimum from new splice boxes, pull boxes, manholes, vaults, or similar subsurface facilities. (UG1000 sheet 8)
vi. 60 kV Transmission Lines are to be placed in a separate trench than 12kV or below
vii. Five (5) foot minimum clearance from walls, footings, retaining wall, landscape planter, tree root barrier or other subsurface wall or structure. (UG1250 sheet 9).
viii. Five (5) foot minimum clearance is required between fire hydrant thrust block. The thrust block extends 5’ foot on either side of the fire hydrant in line with the radial water pipe connected to the hydrant. c. VAULTS/MANHOLES
i. Ten (10) foot minimum clearance is required between adjacent Vaults or Manholes.
ii. Five (5) foot minimum clearance is required between adjacent conduits. iii. Minimum 36” from face of curb, or bollards required. iv. 60kV transmission Lines are to be placed in separate manholes than the 12kV lines
d. Poles (Electrolier, Guy Stub poles, service clearance poles, self -supporting steel poles and lighting poles.)
i. Three (3) foot six (6) inches clearance is required from poles for open trench installation. Exceptions are for riser conduit. (UG1250 Sheet 7) e. Guy Anchors
i. Five (5) foot minimum clearance is required between center of anchor line and any excavation area. (UG1250 sheet 15).
f. Trees
i. OH 1230 for Overhead Lines
ii. SD 1235 for Tree Planting Requirements near UG Electric Facilities iii. Trees or Bushes are not to be planted over 60kV transmission line trenches
SVP20. Applicant shall comply with the following SVP standards (as may be amended or supplemented.
a. Installation of Underground Substructures by Developers b. UG1250 – Encroachment Permit Clearances from Electric Facilities c. UG0339 – Remote Switch Pad
d. OH1230 – Tree Clearances From Overhead Electric Lines e. SD1235 – Tree Planting Requirements Near Underground Electric Facilities f. UG1225 – Pad mounted Equipment Clearances
SVP21. The Developer shall provide and install electric facilities per Santa Clara City Code chapter 17.15.210. Applicant to provide and install electrical substructure as defined on Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 24

SVP developer work drawings for parcel frontage improvements & service requirements for each building/parcel.

SVP22. Electric service shall be underground as required by SVP. See Electric Department Rules and Regulations for available services.

SVP23. Installation of underground facilities shall be in accordance with City of Santa Clara Electric Department standard UG-1000, latest version, and Santa Clara City Code chapter 17.15.050.

SVP24. Underground service entrance conduits and conductors shall be “privately” owned, maintained, and installed per City Building Inspection Division Codes. Electric meters and main disconnects shall be installed per Silicon Valley Power Standard MS-G7, Rev. 2.

SVP25. The developer shall grant to the City, without cost, all easements and/or right of way necessary for the provision of electric service to the property of the developer and for the installation of utilities (Santa Clara City Code chapter 17.15.110) as generally shown on the Vesting Tentative Map.

SVP26. If the “legal description” (not “marketing description”) of the units is condominium or apartment, then all electric meters and services disconnects shall be grouped at one location, outside of the building or in a utility room accessible directly from the outside for SVP’s 24/7 emergency access. If they are townhomes or single-family residences, then each unit shall have it’s own meter, located on the structure. A double hasp locking arrangement shall be provided on the main switchboard door(s). Utility room door(s) shall have a double hasp locking arrangement or a lock box shall be provided.

Utility room door(s) shall not be alarmed. Please refer to SVP rules and regulations section 9.A.6 “Meter Locations.” Any deviations may be submitted to SVP for review & approval.

SVP27. If transformer pads are required, SVP requires an area of 17’ x 16’-2”, which is clear of all utilities, trees, walls, etc. This area includes a 5’-0” area away from the actual transformer pad. This area in front of the transformer may be reduced from a 8’-0” apron to a 3’-0”, providing the apron is back of a 5’-0” min. wide sidewalk. Transformer pad must be a minimum of 10’-0 from all doors and windows, and shall be located next to a level, drivable area that will support a large crane or truck.

SVP28. All trees, existing and proposed, shall be a minimum of five (5) feet from any existing or proposed SVP facilities. Existing trees in conflict will have to be removed. Trees shall not be planted in PUE’s or electric easements.

SVP29. Any relocation of existing electric facilities shall be at Developer’s sole costs and expense.

SVP30. Applicant shall pay all Applicant fees per the City of Santa Clara’s Municipal fee schedule for Electric fees. These fees are separate from any costs that are charged as part of the Substation Agreement.

SVP31. The Applicant shall perform, in accordance with current City standards and specifications, all trenching, backfill, resurfacing, landscaping, conduit, junction boxes, vaults, street light foundations, equipment pads and subsurface housings required for power distribution, street lighting, and signal communication systems, as required by the City in the development of frontage and on-site property. Upon completion of improvements satisfactory to the City, the Applicant will dedicate the improvement to the City subject to City’s acceptance the work. The Applicant shall further install at his cost the service facilities, consisting of service wires, cables, conductors, and associated equipment necessary to connect Applicant to the electrical supply system of and by the City. After completion of the facilities installed by developer, the City shall furnish and install all cable, switches, street lighting poles, luminaries, transformers, Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 25

meters, and other equipment that it deems necessary for the betterment of the system (Santa Clara City Code chapter 17.15.210 (2)).

SVP32. Applicant shall comply with all applicable SVP rules, regulations, guidelines, and requirements, as may be amended from time to time.

SVP33. Non-Utility Generator equipment shall not operate in parallel with the electric utility, unless approved and reviewed by the Electric Engineering Division. All switching operations shall be “Open-Transition-Mode”, unless specifically authorized by SVP Electric Engineering Division. A Generating Facility Interconnection Application must be submitted with building permit plans. Review process may take several months depending on size and type of generator. No interconnection of a generation facility with SVP is allowed without written authorization from SVP.

SVP34. Encroachment permits will not be signed off by Silicon Valley Power until Developers Work substructure construction drawing have been completed & signed off on by SVP.

SVP35. All SVP-owned equipment is to be covered by an Underground Electric Easement (U.G.E.E.) This is different than a PUE. Only publicly owned dry utilities can be in a UGEE. Other facilities can be in a joint trench configuration with SVP, separated by a 1’ clearance, providing that they are constructed simultaneously with SVP facilities.

See UG 1000 for details. Applicant shall provide SVP all U.G.E.E. required to cover all existing and new proposed facilities on the Applicant’s project site.

SVP36. Proper clearance must be maintained from all SVP facilities in accordance with all applicable requirements, including a 5’ clearance from the outer wall of all conduits.

This is in addition to any UGEE specified for the facilities. Contact SVP before making assumptions on any clearances for electric facilities.

SVP37. Developer shall only locate transformer and switch devices outdoors. These devices MAY be placed 5’ from an outside building wall, provided that the building wall in that area meets specific requirements. (See UG 1000 document for specifics) EXAMPLE: If there are any doors, windows, vents, overhangs or other wall openings within 5’ of the transformer, on either side, then the transformer MUST be 10’ or more away from the building. These clearances are to be assumed to be clear horizontally 5’ in either direction and vertically to the sky.

SVP38. All existing SVP facilities, onsite or offsite, are to remain unless noted on an SVP’s developer works drawing. It is the Developers’ responsibility to maintain all clearances from equipment and easements. Developer should not assume that SVP will be removing any existing facilities without detailed design drawings from SVP indicating potential removals. Simply indicating that SVP facilities are to be removed or relocated on conceptual plans does not imply that this action has been approved by SVP.

SVP39. SVP does not utilize any sub-surface (below grade) devices in its system. This includes transformers, switches, etc.

SVP40. All interior meter rooms at ground level are to have direct, outside access through only ONE door. Interior electric rooms must be enclosed in a dedicated electric room and cannot be in an open warehouse or office space.

SVP41. Applicant shall comply with the requirements, as amended, for High-rise Metering and Multi-Floor Infrastructure requirements where applicable, including, a. Refer to UG0250 – High Density Residential Metering Requirements b. Refer to FO-1901 – Fiber Optic Splicing and Testing Methods SVP42. In the case of podium-style construction, all SVP facilities and conduit systems must be located on solid ground (aka “real dirt”), and cannot be supported on parking garage ceilings or placed on top of structures.

SVP43. Notwithstanding SVP39, as determined by SVP in its sole discretion, if the SVP facilities and conduit systems are absolutely required to be on the podium or street above any Project building(s), Applicant shall meet SVP’s design and installation Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 26

requirements and standards (as determined by SVP) and pay all related costs, including, without limitation, .the cost of conducting a study and future maintenance costs Applicant’s share of the cost of maintenance of those facilities shall be determined by the study.

SVP44. Any proposed improvement that does not meet the requirement of the current SVP standard shall be reviewed and approved by SVP in advance in writing. Applicant shall be responsible for any cost associated with non-SVP standard equipment, including, but not limited to, design reviews, study, standard preparations, and testing.

Applicant’s share of the cost of maintenance of those facilities shall be determined by the study.

SVP45. Applicant shall contact SVP (CSC Electric Department) to obtain specific design and utility requirements that are required for building permit review/approval submittal.

SVP46. Developer’s proposed project requires a new electric distribution substation to serve Applicant’s load and transmission system improvements.
a. Applicant must enter into a Substation Agreement (in a such form and content required by SVP) with SVP for such substation no earlier than Developer, (1) receiving full entitlements from the City, including but not limited to a completed CEQA; (2) CAISO approval of projects required to serve Developer's project load; and (3) City Council adopted projects required to serve Developer's project load. This Substation Agreement shall have such terms and conditions as SVP may require and shall set forth Applicant's obligations with respect to supplying Applicant with initial interim electric power and then with permanent capacity and transmission infrastructure for the projects, including, without limitation, Applicant’s payment of any applicable fees, costs, and expenses associated with Applicant's project.
i. These conditions of approval do not commit the City to (1) serve Developer’s electric load or (2) allocate any capacity to Developer. b. Applicant shall coordinate and cooperate with City for the design, procurement, and construction of the substation; provided that, Applicant shall be responsible for all costs and expenses to the extent set forth in the Substation Agreement.

City shall have no obligation to undertake the design, procurement, and construction of the substation prior to the execution of the Substation Agreement, Funding Agreement, and completion of such other SVP requirements. c. Applicant shall (1) coordinate with SVP to design and construct and fund (a) a transmission line extension to connect the new substation with SVP's transmission system; (b) the reconductoring of the existing underground 60kV loop and associated facilities from San Tomas Aquino Creek to Mission Substation as specified in the Substation Agreement; and (2) comply with such other requirements in the applicable Transmission System Impact Study. d. Upon their completion, SVP shall own, operate and maintain all City-owned Substation Facilities and Transmission Facilities, and all equipment therein. e. Applicant convey in fee any and all property for substation site and all easements and other property rights necessary to construct, complete, operate and maintain the Substation Facilities.
f. Applicant is responsible for costs outlined in the Substation Agreement related to transmission facility extensions to service the substation facility. g. SVP has performed an Interconnection Study (i.e, System Impact Study) to assess requirements of interconnection for the project. SVP may require an additional study as necessary. Requirements will consist of the following; i. The System capacity of SVP’s electric transmission system require the following mitigation measures.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 27

1. A portion of the existing NRS to Mission Transmission Line is to be reconductored to allow an initial load ramp up to 9MVA for the electric load of Applicant’s project. The 9 MVA is solely to serve the electric load of Applicant’s project and does not otherwise run with the land. The 9 MVA is subject to a ramp rate and reduction as set forth in the Substation Agreement.

2. The Applicant’s project shall not have an electric load beyond 9MVA, unless an extensive transmission system rebalancing project, tentatively referred to as “Loop 1” is completed. SVP has no obligation to undertake or pay for Loop 1.

3. In the event SVP determines, in its sole and absolute discretion, to undertake Loop 1 Project and Applicant desires additional electric capacity beyond 9MVA, Applicant will be responsible for a portion of the costs of the Loop 1 transmission system improvements; provided the Applicant executes a funding commitment agreement in such form and substance required by SVP.

4. Applicant will have the option to fully fund Loop 1to accommodate Applicant’s schedule.
ii. Determine when to include Applicant load ramp in SVP’s load forecast to the California Energy Commission (CEC).
iii. Determine when Applicant will be allowed to energize facilities, and allowed ramp schedule.
h. Applicant has entered into a Funding Agreement with the City to fund pre-design work of the substation. The primary deliverable of the pre-design work was “Democracy Substation Feasibility Study.” Upon approval Project entitlements and execution of a Substation Agreement, this will serve as a basis for the design of the substation and transmission line extension. The purpose of the Funding Agreement was for pre-design work only and is not in any way an endorsement of the project receiving entitlements from the City.

WATER & SEWER DEPARTMENT
W1. Recycled Water Use: Pursuant to Chapter 13.15, Water, Article IV. Regulation of Recycled Water Service and Use, of the Municipal Code, the project is required to use recycled water for all non-potable uses where recycled water is made available and where provided for by Recycled Water regulations. This project is required to extend and connect to the City’s existing Recycled Water System.

W2. Potable Water Redundancy: For all onsite industrial water use that requires uninterrupted service, the project shall provide a potable water back-up supply source that complies with all recycled water separation requirements.

W3. Recycled Water Design: Each Recycled Water land use (irrigation, dual-plumbing, cooling system, industrial processes, etc.) shall have a separate metered service connection to the main. Applicant shall verify separations between all potable/fire lines and recycled water lines, pipe type, pipe depths, equipment types, warning lids, tags and signs.

W4. Onsite Recycled Water Review: The applicant shall submit all completed SBWR Proposed Use Request Applications to the Compliance Division of Water and Sewer Utilities at [email protected] for review and approval. All on-site recycled water plans shall be reviewed, approved, and signed by the City of Santa Clara, SBWR, and Department of Drinking Water. All three entities must individually review and approve a plan set for Final Approval. Contact the Compliance Division of Water and Sewer Utilities via email or by phone at (408) 615-2002 for more information Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 28

W5. On-site Recycled Water Construction: Construction and installation of all on-site recycled water system equipment shall not begin until the Compliance Division of Water and Sewer Utilities has approved the on-site recycled water design. Please note on-site designs are generally not the same as the Building Permit plans. On-site recycled water plans require SBWR and California State Water Resources Control Board, Division of Drinking Water signatures for final approval.

W6. On-site Recycled Water Inspection: Inspections are required at all on-site recycled water systems being installed prior to backfilling trenches or cover in walls and ceilings.

Request a recycled water inspection by email [email protected] or call (408) 615-2002. Please provide the site location, SBWR project ID, and date and time preferences. These inspections are in addition to the Building Permit inspections. a. Need to verify separations between all potable/fire lines and recycled water lines, pipe type, pipe depths, equipment types, warning lids, tags and signs.

W7. Recycled Water Main: The project shall replace all existing recycled water mains with new 12" DIP recycled water mains in all streets within or adjacent to the project site.

W8. Potable Water Main: The applicant shall replace all the existing water mains with new 12" DIP pipe water main in all streets within and adjacent to the project site.

W9. Encroachment Permit: Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.

W10. Utility Design Plans: Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details. Note that all new water meters and backflow prevention devices shall be located behind the sidewalk in a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.

W11. Utility Separations: Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services: 10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water services, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.

W12. Separate Services: Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right-of- Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 29

way to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.

W13. City Standard Meters and Backflows: All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.

W14. Existing Services: The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.

W15. On-Site Storm Drain Treatment: Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system. The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system.

W16. Water Usage: Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).

W17. Landscaping: All the landscaping for the project shall comply with the California Water Conservation in Landscaping Act, Government Code Section 65591 et. seq. All plants shall be either California native or non-invasive, low water-using or moderate water- using plants. High water-using plants and nonfunctional turf are prohibited.

W18. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities.

Decorative water features may be permanently connected to the City’s recycled water supply.

W19. Easements: Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite.

The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-of- way without overlapping any public utility easement. Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.

W20. Underground Fire Permit: Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408)615-2000. A dedicated fire service line, with an approved backflow prevention device, shall be used for on-site fire hydrants. Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.

Conditions of Approval PLN2018-13400 / 4995 Patrick Henry Drive and 3005 Democracy Way CC Date: November 19, 2024 Page 30

W21. Record Drawings: Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as-built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the Director of Water & Sewer Utilities Department.

W22. Water Shortage Response Actions: Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.

Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control.
b. restrict the use of potable water used for construction and dust control if recycled water is available.

This project is subject to all the requirements and restrictions of the Water Shortage Response Actions in place or adopted during the duration of the project. For more information, visit the City of Santa Clara Water & Sewer Utilities website at www.santaclaraca.gov/waterconservation.

ACKNOWLEDGEMENT AND ACCEPTANCE OF CONDITIONS OF APPROVAL

Permittee/Property Owner

The undersigned agrees to each condition of approval and acknowledges and hereby agrees to use the project property on the terms and conditions set forth in this permit.

Signature: _________________________________________________

Printed Name: _________________________________________________

Relationship to Property: _________________________________________________

Date: _________________________________________________

Pursuant to Santa Clara City Code 18.128.100, the applicant shall return this document to the Department, properly signed and dated, within 30- days following the date of the Acknowledgement.

03.11.2022 (1st submittal)

11.23.2022 (2nd submittal)

04.21.2023 (3rd submittal)

10.31.2024 (Office/R&D - Residential Flex submittal)

REZONING APPLICATION

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
ii
Conceptual visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
iii

PROJECT SPONSOR
Kylli, Inc.

ARCHITECT
Gensler

CIVIL ENGINEERING
BKF

LANDSCAPE ARCHITECT
Field Operations

MEP ENGINEERING
Arup

SUSTAINABILITY
Gensler

TRAFFIC
Hexagon

PARKING
Watry Design, Inc.

DEVELOPMENT MANAGER
Harmonie Park

LAND USE
Holland & Knight
| PROJECT TEAM |
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
iv
01 I Introduction
CHAPTER 01 | INTRODUCTION 1

01.1 PROJECT DESCRIPTION 3

01.2 THE VISION 4

01.3 GUIDING PRINCIPLES 5

01.4 PROJECT LOCATION 6

01.5 PROJECT PROGRAM 8

CHAPTER 02 | DEVELOPMENT PLAN 9

02.1 COMMUNITY CONTEXT 11

02.2 LAND USE AND ZONING 15

02.3 PERMITTED USES 17

02.4 DEVELOPMENT ORGANIZATION 24

02.5 CONNECTIVITY 25

02.6 PROGRAM ORGANIZATION 26

02.7 DEVELOPMENT PROGRAM AREAS 27

02.8 PROGRAM LAYOUT & ACCESS 28

02.9 MOBILITY 32

02.10 TRANSPORTATION DEMAND MANAGEMENT 34

02.11 AFFORDABLE HOUSING 36

02.12 DEVELOPMENT STRATEGY 38

CHAPTER 03 | OPEN SPACE 40

03.1 INTRODUCTION 42

03.2 COMMUNITY OUTREACH 44

03.3 SUSTAINABLE LANDSCAPE MEASURES 45

03.4 PUBLICLY DEDICATED PARKLAND 46

03.5 PROGRAMMING 48

03.6 PARKLAND DELIVERY 57

03.7 PRIVATE OPEN SPACE 58

03.8 SITE CIRCULATION 61

03.9 PLANTING STRATEGIES 63

CHAPTER 04 | STREETS AND STREETSCAPES 66

04.1 DESIGN PRINCIPLES 68

04.2 STREET TYPOLOGIES 69

04.3 TASMAN DRIVE - GATEWAY 71

04.4 KYLLI DRIVE EAST / WEST 72

04.5 PATRICK HENRY DRIVE 73

04.6 OLD IRONSIDES DRIVE 74

TABLE OF CONTENTS

CHAPTER 05 | DESIGN GUIDELINES & STANDARDS 75

05.1 INTRODUCTION 77

05.2 SITE DESIGN PRINCIPLES 78

05.3 MASSING AND ARCHITECTURE 79

05.4 BUILDING HEIGHTS 81

05.5 SETBACKS 82

05.6 STEP BACKS 83

05.7 CIRCULATION 84

05.8 PARKING 87

05.9 LOADING & SERVICE ACCESS 91

05.10 BUILDING DESIGN PRINCIPLES 95

05.11 MODULATION AND FACADES 96

05.12 OFFICE DESIGN 98

05.13 RESIDENTIAL DESIGN 99

05.14 GROUND FLOOR 101

05.15 ROOF 103

05.16 OPEN SPACE DESIGN PRINCIPLES 104

05.17 PARKS & OPEN SPACE 105

05.18 SIGNAGE 108

CHAPTER 06 | INFRASTRUCTURE 109

06.1 INTRODUCTION 111

06.2 EXISTING CONDITIONS 113

06.3 SUMMARY OF “MAKE-READY” IMPROVEMENTs 117

CHAPTER 07 | SUSTAINABILITY 119

07.1 VISION 121

07.2 GOALS 122

07.3 SITE CHARACTERISTICS AND OPPORTUNITIES 123

07.4 ENERGY AND CARBON EMISSIONS 125

07.5 WATER AND ECOSYSTEM 127

07.6 MATERIAL RESOURCES 129

07.7 WELL-BEING AND COMMUNITY 131

07.8 PREPARING FOR THE FUTURE 133

CHAPTER 08 | REVIEW PROCESS 135

08.1 PROJECT APPROVALS 136

08.2 PROJECT IMPLEMENTATION 137

08.3 PROJECT FINANCING 138
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
1 01 | INTRODUCTION
Illustrative visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
2 01 I Introduction

MISSION POINT
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
3 Mission Point is envisioned as a vibrant, new

48.6 acres neighborhood with a diverse and
complimentary mix of uses that will enrich
connections between people, places, and
nature.

01.1 PROJECT DESCRIPTION
View from south of site looking north
01 I Introduction
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
4 A vibrant, urban neighborhood:

A convergence of commerce and culture - work
and play, walk and bike. Mission Point proposes a
wide array of amenities to make everyday life more
balanced and enjoyable.

Homes for everyone:

Includes a variety of homes designed to attract
diverse households -- single professionals, multi-
generational families, single-nesters, retirees, and a
wide range of income levels - including homes that
meet the City’s affordable housing requirements
and that provide deeper levels of affordability.*
A neighborhood that runs on leg power:

Our mixed use design envisions less driving
and more walking within our site, easy access
to light rail, a multi-use pathway, bike and
pedestrian zones, and seamless bike trail
connections to our neighbors beyond Mission
Point.

Parks and Open Spaces:

Significant public parkland and open space is
proposed within the site, including a central
spine that connects with the neighboring
Patrick Henry Drive Specific Plan (PHDSP) area
to the south -- ensuring that residents, workers,
shoppers, diners, visitors and our community
neighbors can easily access and use these
spaces.

01.2 THE VISION
Illustrative visualization of the proposed development
* Additional flexibility is provided to add additional homes, with a corresponding reduction in Office/R&D uses, while maintaining a vibrant, mixed use neighborhood.
01 I Introduction
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
5 Interconnected
A walkable neighborhood designed to promote
movement and interactive activity.

Inclusive
Mission Point will be a place that says welcome
in many ways, to people of all ages, stages of
life and income levels.

Sustainable by Design
Vibrant with a sense of community pride, living
in harmony with the natural environment –
conserving energy and water, and protecting air
quality.

Human-centric
Every aspect of Mission Point acknowledges
the radically ordinary need for human-centered
experiences and design – bringing joy and
harmony to everyday life.

01.3 GUIDING PRINCIPLES
Illustrative visualization of the proposed development
01 I Introduction
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
6 The Mission Point project site is located along
the Tasman Drive Corridor in Santa Clara. It is
bordered by Tasman Drive to the north, Old
Ironsides Drive to the east, Patrick Henry Drive
to the west, and the Hetch Hetchy Right-of-
Way (SFPUC) and the Patrick Henry Drive
Specific Plan area to the south. See Figure 01-1
for a context map of the 48.6 acres project site.

01.4 PROJECT LOCATION

MISSION POINTMISSION POINT

PATRICK HENRY DRPATRICK HENRY DR

OLD IRONSIDES DROLD IRONSIDES DR

TASMAN DRTASMAN DR

DEMOCRACY WAYDEMOCRACY WAY
Project Site Map

SFPUCSFPUC
01 I Introduction
SITE
5min5min
10 10 minmin
10 10 minmin
20 20 minmin
30 30 minmin
60 60 minmin

ALVISO PONDSALVISO PONDS

SUNNYVALE

SANTA CLARA
Lawrence Expy
Montague Expy
101
237

SAN JOSE
Capitol Corridor

SAN JOSE AIRPORTSAN JOSE AIRPORT

MOFFETT FIELDMOFFETT FIELD

MISSION MISSION

COLLEGECOLLEGE

BAYLANDS PARKBAYLANDS PARK
LEVI’S LEVI’S

STADIUMSTADIUM
Light RailLight Rail
N
0’ 1000’ 2000’ 4000’ 8000’
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
7 Figure 01-1: Context map
01 I Introduction
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 01 I Introduction
8 Inclusive of the necessary elements to form
a complete multi-use neighborhood, Mission
Point will provide:
• ∼ 3,000,000 square feet of commercial
office / research & development space,
including labs
• ∼ 100,000 square feet of retail
• ∼ 1,800 new multi-family homes; or if
the Office/R&D – Residential Flex option
is selected, up to 2,600 multi-family
homes, provided there is a corresponding
reduction in Office/R&D as described in
Section 02.7.
• A minimum of 15% below market rate
homes, at an average affordability level
not to exceed 80% AMI
• Large network of diverse, accessible, and
interconnected park, trail, plazas and
other open spaces
• ∼ 10,000 square feet of childcare facilities

01.5 PROJECT PROGRAM
Commercial
Retail
Housing
Childcare
Community Spaces
Parkland & Open
Space
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 02 I Development Plan
9 02 | DEVELOPMENT PLAN
Illustrative visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 02 I Development Plan
10 MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 11 02 I Development Plan
Transportation
The transit options in the area include VTA (Old
Ironsides and Reamwood stations are located
next to the project site), ACE transit, future
BART connections, and Caltrain. The site is
also located near several trails that run along
Calabazas Creek and San Tomas Aquino Creek.

Figure 02-1_01 illustrates the transportation
options in relation to the site.

Existing Uses
The site is within walking distance of Great
America Theme Park, Levi’s Stadium, the Santa
Clara Convention Center, and Mission College.

The surrounding built environment also
includes office and light-industrial buildings,
and low-density residential neighborhoods.

Recreational Context
The Mission Point infill redevelopment project
transforms an existing surface parking lot
as an opportunity to restore the health and
resilience of the landscape, while providing
outdoor amenities for the local community.

Santa Clara is host to a variety of diverse and
linked open spaces, which encourage access to
nature and recreation and promote a healthy
community. Mission Point supports these goals
by providing a valuable connection between
the Tasman Drive Corridor and the future trail
network. See Figure 02-1_02 for recreational
features around the site.

Surrounding Developments
The City of Santa Clara General Plan, adopted
in 2010, identifies three specific plan areas
North of U.S. 101 for redevelopment as
high-density mixed-use neighborhoods: the
Tasman East Specific Plan Area, Patrick Henry
Drive Specific Plan, and Freedom Circle Focus
Area. Patrick Henry, Freedom Circle, Tasman
East, and a private development, City Place
(now named Related Santa Clara), have been
approved. Freedom Circle remains a future
focus area, although a portion of the area
has already been entitled for 1100 dwellings.

Refer to Figure 02-1_03 for the planned
developments and key destinations in the
surrounding area.

One of the key goals of these plans is to create
a sense of neighborhood by adding housing and
community amenities to existing high-intensity
office / R&D.

02.1 COMMUNITY CONTEXT
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 12 02 I Development Plan
N
0’ 1000’500’ 2000’ 4000’
Freeway/ Expressway
VTA Light Rail
Capitol Corridor

ALVISO PONDSALVISO PONDS

SUNNYVALE

SANTA CLARA
Lawrence Expy
Montague Expy
101
237

SAN JOSE
Capitol Corridor
10 min10 min
5 min5 min

SAN JOSE AIRPORTSAN JOSE AIRPORT

MOFFETT FIELDMOFFETT FIELD

MISSION MISSION

COLLEGECOLLEGE

SAN TOMAS SAN TOMAS AQUINO CREEKAQUINO CREEK

GUADALUPE RIVERGUADALUPE RIVER

BAYLANDS PARKBAYLANDS PARK

CALABAZAS CREEKCALABAZAS CREEK
SITE
Light Rail
ViennaVienna ReamwoodReamwood
Old IronsidesOld Ironsides
Great AmericaGreat America
Lick MillLick Mill
Figure 02-1_01:

Area Transportation Map
Transportation
LEVI’SLEVI’S

STADIUMSTADIUM
Santa Clara Santa Clara
Great America Great America

MISSION COLLEGEMISSION COLLEGE
LEVI’S LEVI’S

STADIUMSTADIUM

LICK MILL LICK MILL

PARKPARK

SAN TOMAS SAN TOMAS AQUINO CREEKAQUINO CREEK

GUADALUPE RIVERGUADALUPE RIVER

CALABAZAS CREEKCALABAZAS CREEK
CALIFORNIA’S CALIFORNIA’S

GREAT AMERICAGREAT AMERICA
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 13 02 I Development Plan
N
0’ 1000’500’ 2000’ 4000’
1 0
2 3
4 5
6 7
8 9
10 11
1 0
2 3
4 5
6 7
8 9
Attractions
Levi’s Stadium
Youth Soccer Park
California’s Great America
Fuller Street Park
Agnew Park
Fairway Glen Park
Lick Mill Park
Ulistac Natural Area
West Valley College
Mission Campus
Fairwood Park
Lakewood Park
Baylands Park
City Limits
Recreation Facilities
Sports Stadium
Neighborhood Park
Trail / Bike Path
Future Trail / Bike Path
Open Space
Wetland / Salt-Pond
Open Water / Waterway
Public Open Space
Educational Facility
10 11
SITE
Figure 02-1_02:

Recreational Context Map
Recreational Context

GOLF COURSE
(CLOSED - NO LONGER IN USE)

FUTURE RELATED DEVELOPMENT

ALVISO PONDSALVISO PONDS

SUNNYVALE

SANTA CLARA

SAN JOSE
ViennaVienna
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 14 02 I Development Plan
N
0’ 1000’500’ 2000’ 4000’
Approved Plans
Future Focus Area
Project Site
Park
Existing Trail
Future Trail
VTA Light Rail
Capitol Corridor

SANTA CLARA
5 min5 min

MISSION COLLEGEMISSION COLLEGE

SAN TOMAS SAN TOMAS AQUINO CREEKAQUINO CREEK

GUADALUPE RIVERGUADALUPE RIVER

BAYLANDS PARKBAYLANDS PARK

LAKEWOOD LAKEWOOD

PARKPARK

FAIRWAY FAIRWAY

GLEN GLEN

PARKPARK

FULLER ST FULLER ST

PARKPARK

AGNEW AGNEW

PARKPARK

FAIRWOOD FAIRWOOD

PARKPARK

CALABAZAS CREEK TRAILCALABAZAS CREEK TRAIL
SITE

GREAT AMERICAGREAT AMERICA
ReamwoodReamwood
Old IronsidesOld Ironsides

PATRICK HENRY
DRIVE

FREEDOM
CIRCLE
TASMAN
EAST

RELATED

SANTA CLARA
Figure 02-1_03:

Developments and Key Destination Map
Surrounding Developments
LEVI’S LEVI’S

STADIUMSTADIUM

ALVISO PONDSALVISO PONDS
10 min10 min
Santa Clara Santa Clara
Great America Great America Lick MillLick Mill
Great AmericaGreat America

SUNNYVALE

SAN JOSE
Urban Center Mixed-Use
Urban Center Mission Point
Adopted Specific Plans
Urban Center / Entertainment District
Low Intensity Office / R&D
High Intensity Office / R&D
Regional Commercial
Parks / Open Space
Low Density Residential
Very Low Density Residential
Medium Density Residential
High Density Residential
Public / Quasi Public
Neighborhood Mixed-Use
Neighborhood Commercial
Figure 02-2_01: General Plan Land Use Diagram
(Phase III: 2025-2035) reflecting proposed project.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 15 02 I Development Plan
Existing Conditions
Under existing conditions, the site is zoned
as High-Intensity Office/Research and
Development (HO-RD) and is comprised of
four office buildings, surface parking lots, and a
roadway (Democracy Way).

Land Use Concept
The overarching land use concept for Mission
Point is to re-imagine an existing surface
parking lot as an infill development that brings
to life the project vision of a welcoming mixed-
use, transit-oriented development, offering
a vibrant environment in which to live, work,
socialize, and recreate.

The project proposes to demolish the existing
buildings, vacate and relocate Democracy
Way, and transform the site into a mixed-use
neighborhood, with a carefully considered
and optimally balanced combination of
complementary land uses.

Refer to Figure 02-2_01 for the proposed
General Plan land use designations for Mission
Point: Urban Center Mixed-Use and Urban
Center Mission Point. See Figure 02-2_02 for
the project’s proposed zoning.

02.2 LAND USE AND ZONING
R1 - Single Family
R2 - Residential Duplex
R3 - Multi Family Residential
R4 - High Density Residential
R5 - High Density Residential & Planned Development
TN - Transit Neighborhood
CC - Community Commercial
CN - Neighborhood Commercial
CR - Community Regional
HD - Flex
HI - Heavy Industrial
VHDR - Very High Density Residential
HQ-RD - High Intensity Office
LI - Light Industrial
LO-RD - Low Intensity Office
MU-CC - Mixed Use Community Commercial
MU-NC - Mixed Use Neighborhood Commercial
MU-RC - Mixed Use Regional Commercial
MU-VHD - Mixed Use Very High Density Residential
OS - Open Space
PQP - Public / Quasi Public
UC - Urban Center
UV - Urban Village
UR - Village Residential
Adopted PD Zoning
Figure 02-2_02: City of Santa Clara Zoning Map
reflecting proposed project.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 16 02 I Development Plan
USE

PERMIT REQUIREMENTS

DEFINITION ADDITIONAL REGULATIONS DEVELOPMENT AREA
P Allowed by Right
CUP Conditional Use
Permit
MUP Minor Use Permit
-- Not Allowed

RESIDENTIAL USES
Dwelling, Multifamily P
Residential structure containing three or more residential dwelling units, each of which is for the occupancy by one or more persons living as a single housekeeping unit. Includes: triplexes (structures under single ownership with three dwelling units in the same structure); fourplexes (structure under single ownership with four dwelling units in the same structure); apartments (five or more dwelling units under single ownership in the same structure or complex); and common ownership attached unit projects including condominiums and townhouses. Does not include two-family residential dwellings. Santa Clara Zoning Code (SCCC), § 18.160.040.

Chapter 5.13 [Residential Design] C, D
Dwelling, Single-Family –
Residential structure containing one dwelling unit located on a single parcel of land for occupancy by one single household living as a single housekeeping unit. Also includes manufactured housing and mobile homes, when placed on a permanent foundation system.

SCCC, § 18.160.040.

A, B, C, D
Dwelling, Two-Family – Residential structure containing two dwelling units located on a single parcel of land for occupancy by two single households living as a single housekeeping unit. SCCC, § 18.160.040. A, B, C, D Home Occupation P
An accessory commercial activity or business service conducted on the site of a residential dwelling unit, in a manner clearly incidental and secondary to the residential character of the dwelling and surrounding residential neighborhood, and in compliance with the provisions of Section 18.60.120 (Home Occupations). Home occupations do not include business-type activities conducted solely by residents of a unit that are limited to the use of a desk, telephone, and/or personal computer, including telecommuting, which are allowed in all residential zones.

SCCC, § 18.160.080.

SCCC, Article 4, § 18.60.120
[Home Occupations] C, D
Live - Work Facility P
Integrated dwelling unit and working space, occupied and used by a single household, designed or structurally modified to accommodate both residential occupancy and light work activity and that includes: a complete kitchen space and sanitary facilities in compliance with the Building Code and the working space shall only be reserved for and regularly used by one or more occupants of the unit. SCCC, § 18.160.120
SCCC, Article 4, § 18.60.130
[Live-Work Facilities] C, D

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 17 02 I Development Plan
Subject to the development and use limitations set forth in Section 02.7 [Development Program Areas], the following table sets forth allowable and restricted uses in the Planned Development zone. Consistent with SCCC Section 18.04.040, any unlisted uses are prohibited. Uses that are both not listed below and not listed in Article 2 (Zones, Allowable Uses, and Development Standards) may be authorized through the procedure set forth in SCCC Section 18.04.040.B.

02.3 LAND USE TABLE

HUMAN SERVICES USES
Child Day Care Facility P
Establishment that provides non-medical care and supervision of minor children for periods of less than 24 hours. These facilities include the following, all of which are required to be licensed by the State Department of Social Services:
• Child day care home. A child day care facility located in a residence where an occupant of the residence provides care and supervision for up to 14 children in compliance with Health and Safety Code Sections 1597.44 and 1597.465. Children under the age of 10 years who reside in the home count as children served by the day care facility. See Section

18.60.070 (Article 4) for additional standards.
• Child day care center. A child day care facility not operated as a small or large family day care home. Includes infant centers, preschools, and extended child day care facilities. These may be operated in conjunction with a business, school, or religious facility SCCC, § 18.160.030
SCCC, Article 4, § 18.60.070
[Child Day Care Facilities] A, B, C, D

RECREATION, EDUCATION, AND PUBLIC ASSEMBLY USES
Cemetery and
Mausoleum – An area set aside for or containing the long-term confinement of graves, tombs, or funeral urns.

SCCC, § 18.160.030. A, B, C, D
Crematory – Facility where the bodies of deceased people are cremated. SCCC, § 18.160.030. A, B, C, D Community Garden
P - If ancillary use to a primary
use, it is a permitted use
MUP – If primary use, a MUP
is required
Site used for growing plants for food, herbs, or flowers, which is shared and maintained by City residents. SCCC, § 18.160.030. A, B, C, D
Commercial Recreation
Facilities, Indoor MUP
Facility for participant sports and similar types of recreation, including indoor sports complexes, bingo parlors, billiard and pool halls, dance halls, clubs, ballrooms, bowling alleys, laser tag, indoor waterpark and/or aquatic park, and ice skating and roller rinks. This use may also include ancillary commercial facilities customarily associated with the above indoor commercial recreation uses, including but not limited to bars and restaurants, fast-food restaurants, and video game arcades. SCCC, § 18.160.180.

A, B, C, D
Farmer’s Market
(certified) P
A “certified farmers’ market” means a food facility as defined under Section 113742 of the California Health and Safety Code, as the same may be amended from time to time, whose location and operation meet all of the following criteria and standards:
(A) Have been certified by the Santa Clara County agricultural commissioner through the issuance of a current and valid certified farmers’ market certificate; and (B) Are and remain in full conformance at all times with all state and local laws, and related regulations and guidelines, applicable to a certified farmers’ market under Chapter 10.5 (commencing with Section 47000) of Division 17 of the California Food and Agricultural Code, as these state and local laws, regulations and guidelines may be amended from time to time.

SCCC, § 18.160.060
SCCC, Article 4, § 18.60.240
[Certified Farmers’ Markets] A, B, C, D
Fitness Facilities P
A business or an organization charging a membership or use fee, including private clubs and gymnasiums, that provides exercise machines, free weights, swimming pool, spa, steam room or fitness training and classes for use by clients. SCCC, § 18.160.060.

A, B, C, D

RESIDENTIAL USES Cont.

Mobile/Manufactured
Home –
Factory-built structure that is manufactured or constructed under authority of 42 U.S.C. Sec 5403, Federal Manufactured Home Construction and Safety Standards, or California law (Health and Safety Code Sections 18007 and 18008) and is to be used as a place for human habitation.

The structure is manufactured either in whole or in substantial part at an off-site location, transported to the site, assembled on-site, and placed on a permanent foundation. For the purpose of the Zoning Code, a manufactured home shall be considered the same as any site-built single-family detached dwelling. SCCC, § 18.160.130

A, B, C, D

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 18 02 I Development Plan
RECREATION, EDUCATION, AND PUBLIC ASSEMBLY USES cont.

Mortuary or Funeral
Home – Facility where deceased persons are prepared for burial or cremation, and funeral services may be conducted. Includes funeral homes and funeral parlors. SCCC, § 18.160.130. A, B, C, D Parks and Plazas P A public park, including playgrounds and athletic fields/courts and public plazas and outdoor gathering places, for community use. SCCC, § 18.160.160. A, B, C, D Specialized Education
and Training/Studio P
School offering specialized education and training that typically offer certifications rather than academic degrees (e.g., dance, judo, painting) as well as research facilities for institutions of higher education. SCCC, 18.160.190 (modified).

A, B, C, D

RETAIL, SERVICE, AND OFFICE USES
Alcoholic Beverage
Sales and Service P Commercial establishment used for the sale of beer, wine and distilled spirits for consumption off the premises where sold.

SCCC, Article 4, § 18.60.040
[Alcoholic Beverage Sales and
Service]

A, B, C, D
Banks and Financial
Establishments P
Commercial establishments including federally chartered banks, savings and loan associations, industrial loan companies, and credit unions providing retail banking services to individuals and businesses. SCCC, § 18.160.020.

A, B, C, D
Banks and Financial
Establishments, Stand-
alone ATM
P
Stand-alone commercial establishments typically in the form of a self-serve kiosk located in retail shopping centers, areas for commercial entertainment, or adjacent to pedestrian walkways, that provide retail banking services to individuals and businesses. SCCC, § 18.60.020.

A, B, C, D
Bar CUP Commercial establishment used primarily for the sale of alcoholic beverages to be consumed on the premises. SCCC, § 18.160.020. A, B, C, D
Business Support
Center P
Commercial establishment that provide services to other businesses including maintenance, repair and service, testing, rental, etc. Illustrative examples of these services include:
• computer-related services (rental, repair)
• copying and quick printing services
• film processing and photofinishing (retail)
• graphic design services
• mailing and mail box services
• security systems services
• testing laboratories (soils, materials, testing, etc.) SCCC, § 18.160.020

A, B, C, D
Kennel P
Facility where five or more dogs, cats, or other small domesticated animals over the age of four months are kept, whether keeping is for pleasure, profit, breeding, or exhibiting, including places where the animals are boarded, kept for sale or hire. May also include daytime boarding and activity for animals (e.g., “doggie daycares”) and ancillary grooming facilities.

SCCC, § 18.160.110

A, B, C, D
Live Entertainment,
Incidental P A use as defined by City Code Chapter 5.61, that is provided appurtenant to food service in a restaurant and occurs during the same operating hours as food service. SCCC, § 18.160.120.

SCCC, Chapter 5.61
[Public Entertainment Generally] A, B, C, D
Live Entertainment,
Standalone Use –
For the purposes of the Zoning Code, Live Entertainment has the same meaning as Entertainment, as defined in City Code Chapter 5.61, Public Entertainment Generally, when it does not qualify as Incidental Live Entertainment. SCCC, § 18.160.120.

SCCC, Chapter 5.61
[Public Entertainment Generally] A, B, C, D
Maintenance and Repair
Services P
On-site repair and incidental sales of supplies for small household goods, machinery, tools, equipment, and appliances, conducted within an enclosed building. This classification includes furniture refinishing and repair and excludes maintenance and repair of vehicles or industrial equipment” SCCC, § 18.160.130

A, B, C, D

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 19 02 I Development Plan
RETAIL, SERVICE, AND OFFICE USES Cont.

Medical Services,
General (clinics, office,
and laboratories)
P
Facilities primarily providing outpatient medical, mental health, surgical and other personal health services, but which are separate from hospitals, including: medical and dental laboratories, medical, dental and psychiatric offices, outpatient care facilities, acupuncture, and other allied health services. Counseling services by other than medical doctors or psychiatrists may also be considered an “offices, business and professional use. SCCC, § 18.160.130.

A, B, C, D
Nightclub CUP
Commercial entertainment establishments open at night that typically provide food and alcoholic beverages and space for dancing and amplified music (e.g., live band, DJ, stereo sound system). SCCC, § 18.160.140.

A, B, C, D
Office, Business and
Professional P
Facilities and businesses that predominantly offer professional and/or business services including banks, architects, attorneys, accountants, advertising, computer support, land use planners, and other similar professional services and uses. SCCC, § 18.160.150.

A, B, C, D
Outdoor Dining and
Seating P
A dining area with seats and/or tables located outdoors of a restaurant, coffee shop, or other food service establishment, and which is (a) located entirely outside the walls of the subject structure, (b) enclosed on two sides or less by the walls of the structure with or without a solid roof cover, or (c) enclosed on three sides by the walls of the structure without a solid roof cover.

SCCC, § 18.160.150.

SCCC, Article 4, § 18.60.140
[Outdoor Dining and Seating] A, B, C, D
Outdoor Displays and
Sales P
Permanent outdoor display of merchandise incidental to an adjacent indoor retail use, and certain independent outdoor retail sales facilities (e.g., auction yards, flea markets, lumber and other material sales yards). Includes news and flower stands. Does not include the sale of motor vehicles, boats, and recreational vehicles (“Vehicle Sales”), or the rental of vehicles (“Vehicle Rentals”). SCCC, § 18.160.150.

SCCC, Article 4, § 18.60.150
[Outdoor Displays and Sales] A, B, C, D
Personal Service,
General P
Commercial establishment that provides recurrently needed services of a personal nature.

Illustrative examples of these uses include:
• Barber and Beauty Shop
• Clothing rental shop;
• Dry-cleaning pick-up store with limited equipment;
• Laundromats (self-service laundry);
• Locksmith;
• Nail salon;
• Shoe repair shop;
• Tailors and seamstress; and
• Tanning Salon.

These uses may also include accessory retail sales of products related to the personal services provided.

SCCC, § 18.160.160.

A, B, C, D
Personal Services,
Restricted MUP
Commercial establishment that may tend to have a blighting and/or deteriorating effect upon surrounding areas/uses and that may need to be dispersed from other similar uses to minimize adverse impacts. Illustrative examples of these uses include:
• Pawnshop;
• Check-cashing and Payday lending establishments; and
• Tattoo service, branding or body piercing studio. The application of permanent makeup is specifically excluded from this definition
These uses may also include accessory retail sales of products related to the personal services provided. SCCC, § 18.160.160.

SCCC, Article 4, § 18.160.170
[Personal Services, Restricted] A, B, C, D
Restaurant P
Retail establishment (i.e., cafes, coffee houses, diners, food services) engaged in the business of selling/serving food and/or beverages prepared for either on-site or off-site consumption, or both. This includes restaurants with sit-down table service and fast food restaurants. Drive-thru service is not permitted. Ancillary sale of alcohol is permitted if the restaurant is maintained as a bona fide eating place. SCCC, 18.160.180 (modified).

A, B, C, D

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 20 02 I Development Plan
RETAIL, SERVICE, AND OFFICE USES Cont.

Retail Sales
Establishment, Small P
A retail business focusing on the sale of merchandise not specifically listed under another use classification that is less than 75,000 square feet with less than 50 percent of the total sales floor area dedicated to nontaxable goods. SCCC, § 18.160.180.

A, B, C, D
Retail Sales
Establishment, Medium MUP
A retail business focusing on the sale of merchandise not specifically listed under another use classification that is at least 75,000 square feet but less than 150,000 square feet with less than 10 percent of the total sales floor area dedicated to nontaxable goods. SCCC § 18.160.180.

A, B, C, D
Retail Establishment,
Large –
A retail business focusing on the sale of merchandise not specifically listed under another use classification that is 150,000 square feet or larger with less than 10 percent of the total sales floor area dedicated to nontaxable goods. SCCC, § 18.160.180.

A, B, C, D
Veterinary Facilities P
A place where domestic animals or household pets are given medical or surgical treatment and are cared for during the time of treatment. Use as a kennel shall be limited to short time boarding and shall only be incidental to the hospital use. SCCC, § 18.160.220.

A, B, C, D

VEHICLE ORIENTED USES
Vehicle Sales, General CUP
Sale of automobiles, motorcycles, trucks, and similar vehicles and equipment, including display, storage, and incidental rental of the vehicles and equipment. May include the sale of related equipment and parts. SCCC, § 18.160.220 (modified).

SCCC, Article 4, § 18.60.210
[Vehicle Sales Facilities] A, B, C, D
Vehicle Sales,
Wholesale P
Sales limited to an office only, offering the sale of automobiles and light duty trucks. Does not include on-site inventory, display, storage, maintenance, or repair of these vehicles. May be subject to parking requirements of the Department of Motor Vehicles. SCCC, § 18.160.220.

SCCC, Article 4, § 18.60.210
[Vehicle Sales Facilities] A, B, C, D
Vehicle Repair and
Maintenance CUP
The repair, servicing, alteration, restoration, towing, painting, cleaning, or finishing of automobiles, trucks, recreational vehicles, water vessels, golf carts, and other motor vehicles as a primary use, including the incidental wholesale and retail sale of vehicle parts as an accessory use. This includes the following categories:

Major Motor Vehicle Repair. Establishments providing major repair of automobiles, boats, motorcycles, recreational vehicles, or trucks including light duty trucks (i.e., gross vehicle weight of less than 10,000 pounds) and heavy-duty trucks (i.e., gross vehicle weights of 10,000 pounds or more). Examples of uses include full-service motor vehicle repair garages; body, fender, and paint shops; brake shops; machine shops; paint shops; tire sales and installation shops; towing services; transmission shops; and tire recapping. Does not include vehicle dismantling.

Minor Motor Vehicle Repair. Establishments providing minor repair services of golf carts, automobiles, motorcycles, recreational vehicles, or light duty trucks, vans, or similar size motor vehicles (i.e., vehicles that have gross vehicle weights less than 10,000 pounds) including detailing services; installation of electronic equipment (e.g., alarms, stereos, etc.); servicing of cooling, electrical, fuel and exhaust systems; brake adjustments; relining and repairs; oil and lube shops; smog shops, tire and battery sales and installation (not including recapping); and wheel alignment and balancing. Does not include any type of car washing service.

SCCC, § 18.160.220.

SCCC, Article 4, § 18.160.200
[Vehicle Repair and Maintenance
Facilities]

A, B, C, D

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 21 02 I Development Plan

INDUSTRIAL USES
Brewery P
Establishment where malt beverages are manufactured on the premises. Retail sale of related promotional items may be allowed as part of the brewery operation. A brewery may also include a tasting room and entertainment space as part of an accessory use if the floor area used for the tasting room is less than or equal to 25 percent of the total floor area of the facility.

SCCC, § 18.160.020.

A, B, C, D
Research and
Development Facility P
Facility that conducts research, and the design, development and testing of electrical, electronic, magnetic, optical and mechanical components in advance of product manufacturing that may be associated with a manufacturing facility on the same site. Includes chemical and biotechnology and data computing research and development. May allow for minor manufacturing.

SCCC, § 18.160.180.

A, B, C
Industrial, Minor P
Manufacturing, fabrication, processing, and assembly of materials from parts that are already in processed form and that, in their maintenance, assembly, manufacture, or plant operation, do not create substantial amounts of smoke, gas, odor, dust, sound, or other objectionable influences that might be obnoxious to persons conducting business on-site or on an adjacent site. Uses include but are not limited to pottery, ceramics, glass and metal art and craft productions, cabinetry and furniture manufacturing, food and beverage manufacturing, electronics assembly, microchip manufacturing, machinery assembly, paper product manufacturing, product assembly and distribution, and vehicle and boat assembly. This classification includes Accessory Uses associated with the Principal Use—including offices, data centers, laboratories, warehousing and receiving facilities, indoor and outdoor storage, exterior mechanical equipment, and similar uses as well as temporary uses. SCCC, § 18.160.090.

A, B, C
Industrial, Major –
Manufacturing, fabrication, processing, and assembly of materials in a raw form. Uses in this category typically create substantial amounts of smoke, gas, odor, dust, sound, or other objectionable influences that might be obnoxious to persons on an adjacent site. Uses include but are not limited to, product assembly and distribution, vehicle and boat assembly, aggregate processing facilities, plastics and rubber products manufacturing, chemical product manufacturing, lumber and wood product manufacturing, petroleum refining, and pulp and pulp product industries. SCCC, § 18.160.090.

A, B, C, D
Outdoor Use, Storage CUP
An uncovered but improved land area providing for the arrangement and storage of objects, items, commercial or industrial equipment, products, tools, or other materials, typically not in a fixed position and capable of rearrangement. SCCC, § 18.160.150.

A, B, C
Storage, Personal
Facility CUP
Facility with structures containing generally small individual compartmentalized areas or lockers rented as individual storage spaces and characterized by low parking demand. Ancillary outdoor storage for RVs’ and water vessels is also allowed. (Also, commonly referred to as “Mini Storage” or “Self-Storage” facilities.) SCCC, § 18.60.190.

A, B, C
Wholesaling and
Distribution Facility CUP
A commercial establishment engaged in the sale of goods or merchandise to retailers, industrial, commercial, institutional, or other professional business users, or to other wholesalers. In general, it is the sale of goods to anyone other than a standard consumer. SCCC, § 18.160.230.

A, B, C

UTILITY , TRANSPORTATION, AND COMMUNICATION USES
Parking Facility P A parking lot or parking structure customarily used for the temporary parking [of] motor vehicles. Parking facilities should be either primary use or accessory use. SCCC, § 18.160.160. A, B, C, D Public Safety Facility P
Facility necessary to respond to immediate hazards or threats to public health and safety, including fire stations, other fire prevention and firefighting facilities, police and sheriff substations and headquarters, including interim incarceration facilities. SCCC, § 18.160.160.

A, B, C, D

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 22 02 I Development Plan
UTILITY , TRANSPORTATION, AND COMMUNICATION USES Cont.

Wireless
Telecommunication (or
Telecommunications)
Facilities and Towers

P, MUP, CUP
A facility, including all associated equipment, which supports the transmission and/or receipt of electromagnetic/radio signals. Wireless telecommunication facilities include cellular radiotelephone service facilities, personal communications service facilities (including wireless Internet), specialized mobile radio service facilities, and commercial paging service facilities.

Components of these types of facilities can consist of the following: antennas, repeaters, microwave dishes, horns, and other types of equipment for the transmission or receipt of signals, telecommunication towers or similar structures supporting the equipment, equipment structures, parking area, and other accessory development. SCCC, § 18.166.020.

SCCC, Article 4, Chapter 18.66
[Wireless Telecommunications
Facilities]

A, B, C, D
Utility Facilities and
Infrastructure CUP
All equipment, fixtures, and personal property operated or maintained on private property in connection with the production or provision of water, sewer, power, natural gas, telecommunications, or other services, with the exception of Electric Power Plants.

SCCC, § 18.160.210.

A, B, C, D
Photo-voltaic Systems P
A solar collection system consisting of one or more building- and/ or ground - mounted systems, solar photo-voltaic cells, panels or arrays and solar related equipment that rely upon solar radiation as an energy source for collection, inversion, storage and distribution of solar energy for electricity generation. A solar photo-voltaic system is a generation system with a nameplate capacity of not greater than 50 kilowatts if installed at a residential service or not larger than 3,000 kilowatts at other customer service locations. SCCC, § 18.160.160.

A, B, C, D

OTHER USES
Accessory Structure P
A structure, either attached or detached, (e.g., carports, garages, storage sheds, workshops) that is customarily part of, and clearly incidental, related, secondary, and subordinate to the primary structure. See Section 18.60.030 (Accessory Use). SCCC, § 18.160.010.

SCCC, Article 3, Chapter 18.32
[Residential Accessory Structures] A, B, C, D
Accessory Use P Means a use that is customarily associated with and subordinate or incidental to the Primary Use of a lot or structure. See Section 18.60.030 (Accessory Use). SCCC, § 18.160.010.

SCCC, Article 4, § 18.60.030
[Accessory Uses] A, B, C, D

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 23 02 I Development Plan

02.4 DEVELOPMENT

ORGANIZATION

GATEWAY

PARK AREA

GATEWAY
PLAZA

CENTRAL

GREEN PARK
AREA
SOUTH

PARK AREA

NEW SANTA CLARA TRAIL AREA
Figure 02-4: Illustrative
Site Organization Diagram
Area
Public Park
Roadway
N
0’ 100’50’ 200’ 400’
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 24 02 I Development Plan
Mission Point promotes an active pedestrian
realm with continuous access to open space
and public park.

The development will be divided by a staggered
grid which creates four distinct Program Areas
to support the desired mixed-use activity, as
shown in Figure 02-4.

This grid is structured with surrounded open
space at the perimeter of each area. A green
north-south axis creates an interconnected
public park that ties the eastern and western
portions of the site to Tasman Dr and the new
Santa Clara Trail. Through a sequence of areas
this public park connects people from the
Gateway Plaza Area, conveniently positioned
adjacent to the light rail stop, through the
Gateway Park Area and the large Central
Green Park Area to the South Park Area, which
connects to the New Santa Clara Trail Area.

To minimize vehicular infrastructure, while
allowing for efficient access for parking and
service, an access roadway will intersect the
site north and south, terminating at the Central
Green Park Area.

TASMAN DR.

OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way
2500’/15m in w alk
2500’/15min walk
800’ / 2.5 min walk

800’ / 2.5 min walk
1000’/ 3 min walk

1000’/ 3 min walk
600’ / 2 min walk

600’ / 2 min walk
200’/ 1 min walk

200’/ 1 min walk
400’/ 1.5 min walk

400’/ 1.5 min walk
N
0’ 100’50’ 200’ 400’
Figure 02-5: Illustrative Site
Connectivity & Walkability Diagram
Walk radius
Main N-S walk path
Secondary walk path
Internal bike lane
External bike lane
Pedestrian bridge
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 25 02 I Development Plan
With a human-centric design approach, Mission
Point will include pedestrian and cycling
infrastructure to provide a safe, accessible,
and enjoyable community. These linkages
will be both internal and external, connecting
to existing and planned trail systems in the
neighborhood.

See Figure 02-5 for a site non-vehicular
connectivity diagram, which indicates the
multiple access points and circulation flow
within the project.

TASMAN DR.

OLD IRONSIDE DR.

PATRICK HENRY DR

TRANSIT
STOP
TO

CALABAZAS
CREEK

TO SAN

TOMAS CREEK

LIGHT RAIL
STOP

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way

TRANSIT
STOP

PEDESTRIAN BRIDGE AT PODIUM

PEDESTRIAN BRIDGE AT PODIUM

02.5 CONNECTIVITY
Figure 02-6: Illustrative Site
Program Organization Diagram
N
0’ 100’50’ 200’ 400’
Office/R&D
Office/R&D-Residential Flex
Residential
Retail
Parkland
Podium Open Space
Substation
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 26 02 I Development Plan
Mission Point will support a mix of
programmatic uses that will create a
harmonious neighborhood environment to live,
work, socialize, and recreate. The locations of
these various uses within the site have been
carefully considered to best fit within the
neighborhood context.

The area for work is more focused along the
Tasman Dr. corridor, which has access to transit
and adjacency to similar uses. The residential
program is at the southwest corner of the
site, adjacent to the planned Patrick Henry
Drive Specific Plan residential development,
and has immediate access to open space and
recreational amenities Under the Office/R&D –
Residential Flex option the residential program
may also be located in the southeast corner of
the site, which also has immediate access to
open space and recreational amenities.

Amenities will be located primarily at ground
level, and will create synergy between the live
and work project programs. Consolidating and
centralizing these amenities will also allow
visitors to the site to have an engaging and
pleasurable experience.

PATRICK HENRY

SPECIFIC PLAN

SANTA CLARA TRAIL
SFPUC Right-of-way
KYLLI DR. WEST
KYLLI DR. EAST
TASMAN DR.

OLD IRONSIDE DR.

PATRICK HENRY DR

02.6 PROGRAM ORGANIZATION

MISSION POINT PROJECT INFORMATION - GENERAL SUMMARY TABLE AREA ACREAGE* BUILT COVERAGE LAND USE SQUARE FOOTAGE OPEN SPACE ACREAGE PARKING AREA STALL COUNT RATIO/1,000 SF % OF TOTAL “A” Approx. 13.3 acres Approx. 48%
Office
Retail
Total
Max. 1,179,000 gsf
Approx. 30,000 gsf
Approx. 1,209,000 gsf
Accessible L1 Open Space
Private Open Space
Approx. 2.8 acres
Approx. 3.3 acres 1,454,000 sq. ft. Approx. 3,330 2.8 35% “B” Approx. 8.9 acres Approx. 44%
Office
Retail
Total
Max. 1,034,000 gsf
Approx. 43,000 gsf
Approx. 1,077,000 gsf
Accessible L1 Open Space
Private Open Space
Approx. 2.7 acres
Approx. 1.7 acres 990,000 sq. ft. Approx. 2,440 2.3 26% “C” Approx. 12.7 acres Approx. 33%
Office
Retail
Total
Max. 790,000 gsf
Approx. 19,000 gsf
Approx. 809,000 gsf^
Accessible L1 Open Space
Private Open Space
Approx. 4.6 acres
Approx. 2.5 acres ¤ 762,000 sq. ft. ¤ Approx. 1,760 ¤ 2.2 19% “D” Approx. 13.7 acres Approx. 50%
Residential
Retail
Childcare
Total
Approx. 1,800,000 gsf
(Max. 1800 units)
Approx. 8,000 gsf
Approx. 10,000 gsf
Approx. 1,818,000 gsf
Accessible L1 Open Space
Private Open Space
Approx. 2.7 acres
Approx. 4.8 acres
812,000 sq. ft.

Total
Approx. 1,870
Approx. 9,400

1.0 20%

100%

*ACREAGE AREAS ARE APPROXIMATE AND SUBJECT TO CHANGE BASED ON DEVELOPMENT PLANS ¤SUBJECT TO CHANGE WITH OFFICE/R&D RESIDENTIAL-FLEX OPTION

LAND USE PROJECT TOTAL
Office Max. 3,000,000 gsf
Retail Approx. 100,000 gsf
Residential Approx. 1,800,000 gsf
(Max. 1800 units)^
Childcare Approx. 10,000 gsf
TOTAL Approx. 4,913,000 gsf

CAR PARKING RATIO PROVIDED % OF CODE*
Office 0.7 / 300 sq. ft. 73%
Retail 0.9 / 200 sq. ft. 86%
Residential 1.0 / unit 59%
Childcare 1.0 / 300 sq. ft. 100%
Parks/Open Space - NA

*APPROX. PER CITY OF SANTA CLARA PARKING REGULATIONS.

DENSITY & INTENSITY
METHOD OF CALCULATION* ILLUSTRATIVE PLAN
CALCULATION**
Residential Density DU/a = housing units per gross acre Area D = 130 DU/a
(1,800/13.9)
Total Site Area = 37 DU/a
(1,800/48.6)
Floor Area Ratio (FAR)
FAR = “FAR is applied on a parcel-by-parcel
basis or as an average for an entire site
under a single development proposal.”
Total Project FAR = 2.3
FAR excluding residential = 1.5

* THE METHOD OF CALCULATION FOLLOWS THE GENERAL PLAN’S METHODOLOGY AND DEFINITIONS FOR FAR AND DENSITY. MISSION POINT’S PROPOSED URBAN CENTER MIXED USE DESIGNATION ALLOWS A MAXIMUM DENSITY OF UP TO 250 DWELLING UNITS PER ACRE. MISSION POINT PROPOSED URBAN CENTER MISSION POINT DESIGNATION ALLOWS A MINIMUM FAR OF 1.5.
** THE CALCULATION IS PROVIDED TO ILLUSTRATE MISSION POINT’S POTENTIAL DENSITY AND FAR, WHICH WILL BE FINALIZED AS PART OF THE DESIGN REVIEW PROCESS. *** SEE ADDITIONAL LIMITATIONS IN SECTION 05.13 RESIDENTIAL DESIGN.

OPEN SPACE PROJECT TOTAL
Private Open Spaces & Parkland Approx. 25.1 acres

SITE LAND AREA

48.6 Acres

B
C
A
D
Figure 02-7_02*: Program Area key
Figure 02-7_01: Program Area Tables
* Note that Figure 02-7_02 demarcated areas are approximate and subject to change based on development plans.
^ Office/R&D – Residential Flex: Area C may be developed with up to a maximum of 800 residential units, or a mix of uses with a corresponding reduction in square footage of office/R&D uses. If exercised the Office/R&D Residential Flex option results in up to a maximum of 2,600 residential units in Area C and D.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 02 I Development Plan
27 Development Transfer
To provide flexibility in responding to changing
market demands and ensure ongoing feasibility
through a sequenced development process,
density transfers of nonresidential maximum
floor area are allowed among Program Areas
A, B, C, and D (See Figure 02-7_02* for Area
identification). The developer may elect to
transfer up to 5 percent of the maximum
allowed floor area of each of the individual
Areas to one or more of the other Areas.

As a result, the total amount of development
in these Areas could increase or decrease
proportionally, while not exceeding the
maximum build-out for the entire project.

02.7 DEVELOPMENT PROGRAM AREAS
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 28 02 I Development Plan

02.8 PROGRAM LAYOUT AND ACCESS
Mission Point’s site organization will be
structured around a clear north to south axis of
pedestrian-oriented neighborhood uses and an
east to west multi-modal corridor, all designed
to provide a safe and livable community.

The Project’s ground floor will be populated
with a variety of uses and experiences to create
vibrancy throughout the day and evening
within Mission Point and its surroundings.
(Figure 2-8_02).

Anchoring public programming towards the
north end of the site adjacent to the Tasman
light rail corridor will attract users and will
help activate Mission Point’s vibrant retail-
oriented scene, including space for a grocery
and restaurants. As guests and tenants move
south through the park, retail will be right-sized
for shopping experiences that fit within the
context of this new neighborhood.

The heart of the project will be surrounded
by a mixture of retail, amenities, lobbies
and community space to provide a rich
ground plane. From there on, each individual
connection to the exterior of the site will be
focused on specialized uses, such as office
co-working spaces, lobbies, amenities, walk-
in residential units and service areas that will
activate these spaces throughout the day.

Access and circulation to and around Mission
Point varies depending on the mode of
transportation, but caters to a broad audience
as the internal paths and external connections
are designed to provide a safe and comfortable
environment for vehicles, pedestrians, and
cyclists.
• Anchoring vibrant programming towards
the north of the site, closest to the Tasman
light rail corridor, attracts users to the
retail-oriented ground plane. (Figure
2-8_02). Designated vehicular access
points will be provided close to the public
programming, such as restaurants, retail,
and childcare. Parking within structures
above and below grade are adjacent
to retail and the park program. (Figure
2-8_01).
• Tenants within the project will enjoy a
well-structured network of multi-modal
opportunities, including public transit, ride
share, shuttle, autos, cycling, and on foot
(Figure 2-8_03). Primary shuttle zones will
be hosted on internal private roadways.
• Dedicated access points for structured parking
will be located along the periphery of the site.

These parking structures will include seamless
interconnections between basement and
podium levels for quick ingress and egress.

Parking will include multiple points of entry
into adjacent buildings by way of connected
tunnels. A connection from the parking levels
to the podium level will provide an additional
arrival experience for tenants, with access
points around the podium shared open space.
• An internal podium and basement circulation
ring road will create efficient vehicular
movement, and allow for in/egress points from/
to every building to/from any surrounding
streets.
* Note that all figures in this section are illustrative, and are meant to provide general guidance and objective standards for final architectural design. Any stated quantity, dimension, or use placement is subject to change.

OUTOUT
IN IN
ININ
IN IN
IN IN
IN
OUT
OUT
IN
ININ
IN IN
ININ

OUT OUT

OUT OUT

OUT OUTOUT OUT
OUT

OUT OUT

OUT OUT

RAMP DOWN
IN
ININ

OUT OUT
OUT
IN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP UP
TO L2

RAMP UP
TO L2

RAMP UP
TO L2

RAMP DOWN

RAMP DOWN

RAMP DOWN
A
D
B
C
KYLLI DR. WEST
N
0’ 100’50’ 200’ 400’
Development Area
Figure 02-8_01:

Illustrative Ground Level Plan
C
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 02 I Development Plan
29 OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
KYLLI DR. EAST

SUBSTATION

SANTA CLARA TRAIL
SFPUC Right-of-way
TASMAN DR.

OUTOUT
IN IN
ININ
IN IN
IN IN
IN
OUT
OUT
IN
ININ
IN IN
ININ

OUT OUT

OUT OUT

OUT OUTOUT OUT
OUT

OUT OUT

OUT OUT

RAMP DOWN
IN
ININ

OUT OUT
OUT
IN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP UP
TO L2

RAMP UP
TO L2

RAMP UP
TO L2

RAMP DOWN

RAMP DOWN

RAMP DOWN
Figure 02-8_02:

Illustrative Level 1
Program Plan
N
0’ 100’50’ 200’ 400’
Vehicular Access
Parking
Access to L1 / Ramp to B1
Retail
Support / Loading
Office Lobby
Office Amenity
Residential Lobby
Residential Amenity
Residential Dwelling Units
Bike Parking / Service
Day Care
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 02 I Development Plan
30 OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN

SANTA CLARA TRAIL
SFPUC Right-of-way

SUBSTATION
KYLLI DR. WEST
KYLLI DR. EAST
TASMAN DR.

SUBSTATION
OUTOUT
IN IN
ININ
IN IN
IN IN
IN
OUT
OUT
IN
ININ
IN IN
ININ

OUT OUT

OUT OUT

OUT OUTOUT OUT
OUT

OUT OUT

OUT OUT

RAMP DOWN
IN
ININ

OUT OUT
OUT
IN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP UP
TO L2

RAMP UP
TO L2

RAMP UP
TO L2

RAMP DOWN

RAMP DOWN

RAMP DOWN

DROP-OFF DROP-OFF

DROP-OFF

DROP-OFF

DROP-OFF DROP-OFFDROP-OFF

DROP-OFF
T
T
T
P
P
N
0’ 100’50’ 200’ 400’

DROP-OFF
OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN

SANTA CLARA TRAIL
SFPUC Right-of-way
TASMAN DR.

Dedicated L1 Parking
Short Term Bicycle Parking
Public Transit Stop
Shuttle/Vehicular Drop-off
Vehicular Drop-off
Childcare Drop-off
Pedestrian Access
Vehicular Circulation (In/Out)
External Site Circulation
Retail & Active Frontage
P

DROP-OFF
P
Figure 02-8_03:

Illustrative Public Access
and Circulation (Level 1)

DROP-OFF

DROP-OFF
T
P
PP
P
P
P
P P
P
P
P
P
P
P
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 02 I Development Plan
31 MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 32 02 I Development Plan

02.9 MOBILITY
The Mission Point project site is located along
the Tasman Drive corridor in Santa Clara. It is
bordered by Tasman Drive to the north, Old
Ironsides Drive to the east, Patrick Henry
Drive to the west, and the SFPUC’s Hetch
Hetchy Right-of-Way (ROW) to the south. The
site is within walking distance of California’s
Great America, Levi’s Stadium, the Santa Clara
Convention Center, Mission College, and many
existing employers in Santa Clara North. The
area north of U.S. 101 within Santa Clara is
rapidly transforming, with future developments
that include City Place and the Tasman East,
Patrick Henry Drive, and Specific Plan Areas
and the Freedom Circle Future Focus Area.

Transit Network

VTA bus and light rail services (Old Ironsides
and Reamwood light rail stations are adjacent
to the project site along Tasman Drive), ACE
commuter rail service, and the Capitol Corridor
regional rail service are all located in the
immediate vicinity of Mission Point. There
are additional bus connections to ACE and
Caltrain, although there are no direct public
transportation routes to existing BART stations.

The VTA light rail station on Tasman Drive will
provide a direct link to the upcoming Santa
Clara Bart station, which is scheduled to be
completed around 2030. (Figure 02-1_03)
An improved local mobility and circulation
network will support the use of existing and
future transit infrastructure, including VTA light
rail along the Tasman Corridor, bus transit along
Great America Parkway, and multi-use trails
along Calabazas Creek and the Hetch Hetchy
right-of-way. Transit options will connect
Mission Point residents and employees to local
amenities as well as regional destinations.

Shuttle Stop
A proposed on-site shuttle stop located on
Tasman Drive would provide connections to
other transit options such as ACE, Caltrain, and
BART.

Street Network
The site has great regional connectivity
to US 101 and SR 237, both of which have
interchanges at Great America Parkway and
Lawrence Expressway.

Bicycle & Pedestrian Network
The site is located near multiple existing and
planned recreational trails. Two of these trails
run along Calabazas Creek and San Tomas
Aquino Creek, while the John W. Christian
Trail runs through Sunnyvale, above the Hetch
Hetchy Aqueduct. The County of Santa Clara’s
Creek Trail Network Expansion Master Plan
calls for future extension of the Calabazas
Creek Trail over US 101 to Benton Street;
and the development of a Hetch Hetchy Trail
through Santa Clara, stretching from Calabazas
Creek to the Guadalupe River. A brand
new, quarter-mile stretch of trail has been
introduced to complement the proposed South
Park Area.

In addition, on-street bike lanes are located
on Great America Parkway, Tasman Drive,
and Mission College Boulevard. On-street
pedestrian facilities consist of sidewalks,
crosswalks, and pedestrian countdown signals
at signalized intersections.

OLD IRONSIDE DR.

PATRICK HENRY DR
TASMAN DR.

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way

SANTA CLARA TRAIL
Figure 02-9:

Illustrative Vehicular Network
N
0’ 100’50’ 200’ 400’
Areas
Existing Roadway
Proposed Private Roadway
Proposed Secondary Access
Multi-use trail - EVA only
Access to Public/Flex Parking
Substation Service Access
Drop Offs along proposed road
Drop Off along existing road
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 33 02 I Development Plan

SUBSTATION
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 34 02 I Development Plan
The purpose of TDM is to promote more
efficient utilization of transportation facilities
and to maximize the potential for sustainable
transportation usage, while minimizing
negative impacts on the community and
reducing congestion. The project will
implement a combination of services,
incentives, facilities, and actions to shift
employees, residents, and customers from
driving alone to using transit, carpooling,
cycling, and walking. The Project Sponsor will
prepare and submit a TDM Plan for the City’s
approval with the building permit application
for each phase of development.

Vehicle Trip Reduction Targets
The project, upon build-out, is projected to
reduce daily vehicle trips by at least 20% for
the residential area; and at least 25% for the
commercial area compared to the existing
countywide VMT.

This reduction reflects the combined effects
of the project’s location, diversity of land
uses, design, density, and TDM measures. The
reduction in daily vehicle trips is expected to be
approximately equal to the reduction in VMT.

Illustrative visualization of the proposed development

02.10 TRANSPORTATION DEMAND

MANAGEMENT (TDM)
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 35 02 I Development Plan
TDM Measures and Strategies
The TDM measures to be implemented for
the site include design features, programs,
and services that promote sustainable modes
of transportation and reduce the number of
vehicle trips as well as VMT that would be
generated by the project. The project will form a
Transportation Management Association (TMA)
or participate in an existing TMA to oversee and
coordinate TDM activities of various employers
and residential communities on site. A TMA is a
non-profit, member-controlled organization that
provides transportation services in a particular
area.

The TMA may include other proximate
developments, employers, or residential
developments in nearby Focus/Specific Plan
Areas.

TDM measures will be described in detail in the
TDM plan, including the party responsible for
implementing each measure (e.g., developer,
tenant, TMA, City, etc.).

The specific elements of the TDM plan may
vary over time, with periodic changes in the
plan to reflect changes in the transportation
environment and new technologies. Examples of
TDM measures that may be included in the TDM
plan for the project include:
• Privately operated long-haul commuter
shuttle service for office workers with on-
site shuttle stops.
• Participating in city organized/operated
shuttle service to Caltrain and BART
stations with on-site shuttle stops
available to all site workers and residents.
• Transit subsidy for office workers.
• Rideshare matching program
• ‘Guaranteed ride home’ program for all
office workers.
• Preferential parking for carpools and
vanpools.
• Unbundled parking for market-rate
residential units.
• Participation in regional bikeshare and
scooter program, and/or establishment of
on-site bicycle and scooter fleet.
• Bike repair stations and ample bicycle
parking.
• Showers and lockers provided in office
buildings.
• Real-time transit information displayed on
screens throughout the site.
• On-site parking spaces reserved for
carshare service(s) (e.g. ZipCar or
equivalent provider).
• Dedicated curb space for ride hail and taxi
service passenger loading.
• On-site transportation coordinator.
• Website and marketing program to
disseminate information on commute
options.
• High speed internet infrastructure to
enable telecommuting.
• Distribution of a TDM information packet
to new employees and residents.
• On-site bicycle and pedestrian network
linking buildings to transit stations and
nearby trails.

Monitoring and Reporting
The TDM Plan will be monitored to measure
its effectiveness in meeting the vehicle trip
reduction target. The monitoring activities
will be managed by the TMA and will include
traffic counts at all site driveways, and a
survey of employee, resident, and customer
transportation mode shares and travel
preferences. Reports will be submitted to the
City of Santa Clara to document progress
towards achieving the vehicle trip reduction
target. The results of the surveys will be
used to design possible future changes to
the TDM plan (to add, intensify, or change
TDM measures). The TDM plan will explain
the monitoring and reporting process in
detail, including the location, duration, and
methodology of counts and surveys.
1) SCCC, Chapter 17.40.
* Office/R&D – Residential Flex: Up to 2,600 units. If all units are constructed, 390 would be deed-restricted.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 36 02 I Development Plan
Affordable housing is a high-priority goal of the
City of Santa Clara. Mission Point will add up to
1,800* new homes, or up to 2,600 new homes
with the Office/R&D – Residential Flex option,
that will help meet the City’s Regional Housing
Needs Assessment (RHNA). It is important
to note that the Project site was not included
in the City’s 6th Cycle Housing Element as a
housing opportunity site (as adopted on May 7,
2024), but the City’s current 6th Cycle RHNA
targets are based on an assumed development
on the site of 3 million sf of High Density
Office/R&D (the same amount as proposed by
Mission Point) so the new employee generation
will not contribute to the City’s future RHNA
targets, which makes the Project a net positive
to the City’s jobs/housing balance. The Project
has committed to meeting and exceeding the
City wide Affordable Housing Ordinance (1), as

02.11 AFFORDABLE HOUSING
follows:

Residential portion of Mission Point:
• 15% will be deed-restricted affordable
units. If 1,800* units are constructed,
270 would therefore be deed-restricted.

If all 2,600 units under the Office/R&D –
Residential Flex option are constructed,
390 would therefore be deed-restricted.
• The Project has voluntarily commintted
to a higher level of affordability than
is required by Santa Clara’s Citywide
Affordable Housing Requirements
by providing affordable rental prices
affordable to extremely low, very low,
low and moderate income households, or
a combination thereof with a maximum
average affordability level for affordable
homes of 80% of Area Median Income
(AMI) (the City’s baseline requirement is a
maximum affordability average of 100% of
AMI).
• In addition:
-Rental units: no rental affordable unit
will exceed a maximum of 100% AMI.
-For-sale units: no for-sale affordable
unit will exceed 120% AMI.
• The Project’s affordable housing program
will otherwise meet all other requirements
of the City’s Affordable Housing
Ordinance.

Non-residential portion of Mission Point:

Illustrative visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 37 02 I Development Plan
• The affordable housing requirements will
be met through payment of the City’s
Affordable Housing Fee (“AHF”)
Implementation and Timing:

The specific mix and units for the residential
portion of the Project will be identified,
consistent with this Affordable Housing Plan,
as part of the application for Architectural
Review for the residential portion of the
Project. Affordable Housing Agreements (using
the City’s standard form and consistent with
this Affordable Housing Plan) will be entered
into with the City and recorded prior to the
certificate of occupancy for the residential
project.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 38 02 I Development Plan
Construction of the project will include
consideration of the following overarching
objectives:
• Provide an orderly build-out of the
project based on projected market
demand and other factors, such as local
and regional growth, project financing,
and development of final construction
plans.
• Provide critical infrastructure
improvements, including several key
upfront infrastructure components,
which will also provide important
sustainability benefits. Most notable are
the SVP facilities and other site utilities.

It is anticipated that the project will be
constructed in response to market conditions.

There is no set development sequence, but
one potential order is shown for informational
purposes in Figure 02-12.

Other potential development orders, as well
as overlapping/concurrent development and
more sequential development, as well as the
Office/R&D - Residential Flex (Reduced Office/
Increased Housing Alternative), have been
studied in the Environmental Impact Report to
ensure the project can respond to the market,
while ensuring any necessary environmental
mitigations.

02.12 DEVELOPMENT STRATEGY
Figure 02-12: Illustrative Project Construction Sequencing Plan * Totals in each area represent the sum of the area and previous sequences. ** Approximate total development area and parking figures for the development B
B
B
B
C
C
C
C
D
D
D
D
A
A
A
A
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 39 02 I Development Plan
1 3
2 4
TOTAL
SITE AREA: Approx. 12.7 Acres
DEVELOPMENT AREA: Approx. 809,000 sq.ft
TOTAL PARKING: Approx. 1,760 stalls
TOTAL
SITE AREA: Approx. 35.4 Acres
DEVELOPMENT AREA: Approx. 3,704,000sq.ft
TOTAL PARKING: Approx. 6,070 stalls
TOTAL
SITE AREA: Approx. 26.4 Acres
RESIDENTIAL UNITS: Approx. 1,800 DU
DEVELOPMENT AREA: Approx. 2,627,000 sq.ft
TOTAL PARKING: Approx. 3,630 stalls
TOTAL
SITE AREA: Approx. 48.6 Acres
DEVELOPMENT AREA: Approx. 4,913,000 sq.ft
TOTAL PARKING: Approx. 9,400 stalls
TENTATIVE START DATE: 3/1/2025
Office: approx.790,000sq.ft
Retail: approx.19,000 sq.ft
TOTAL: approx. 809,000 GSF
Substation
TENTATIVE START DATE: 11/1/2027
Residential: approx. 1,800,000 sq.ft
(approx. 1,800 homes)
Retail: approx. 8,000 sq.ft
Childcare: approx. 10,000 sq.ft
TOTAL: approx. 1,818,000 GSF
TENTATIVE START DATE: 5/1/2028
Office: approx. 1,034,000 sq.ft
Retail: approx. 43,000 sq.ft
TOTAL: approx. 1,077,000 GSF
TENTATIVE START DATE: 11/1/2029
Office: approx. 1,179,000 sq.ft
Retail: approx. 30,000 sq.ft
TOTAL: approx. 1,209,000 GSF
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 40 03 I Open Space Standards
03 | OPEN SPACE
Illustrative visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 41 03 I Open Space Standards
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 42 03 I Open Space Standards
Nature and History as Inspiration
Mission Point has the potential to become one
of the healthiest and most beautiful workplace
environments in Silicon Valley.

The entire development, including the arrival
and gateway, the office and residential
buildings, and its parks, gardens and green
spaces, will inspire creativity and contribute to
overall wellness. The project draws inspiration
from Santa Clara’s rich history of agriculture
and land husbandry, in particular the cultivation
of fruit and nut orchards. A thoughtfully
designed and nature-inspired place can bring
joy, tranquility and delight, evoking a broader
sense of natural cycles of life for all who work
there.

The settings can have a dramatically positive
impact on health in terms of physical,
mental, and social well-being. Mission Point
has the opportunity to be a significant and
pioneering precedent for the next generation
of workplaces benefiting its immediate
neighborhood, the City of Santa Clara, and
workplaces around the world.

03.1 INTRODUCTION
Santa Clara County “Valley of Heart’s Delight”, illustration postcard. San Jose Chamber of Commerce MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 43 03 I Open Space Standards
05 01 02 15
03 04
16 17
18 19
06 08 09
07 20
21 22
23 25
26 12
14 13
28 29
2710
11 2 mile radius
101 / Bayshore fwy101 / Bayshore fwy
Project
Site

01. YOUTH SOCCER PARK
• SOCCER FIELD

05. MISSION COLLEGE SPORTS FACILITY
• BASEBALL
• SOFTBALL
• TENNIS

03. FULLER STREET PARK
• PICNIC AREA & BBQS
• PLAY AREA

06. BRACHER PARK
• PICNIC AREA & BBQS
• PLAY AREA

08. MACHADO PARK
• PICNIC AREA & BBQS
• BASEBALL
• PLAY AREA

12. WESTWOOD OAKS PARK
• PICNIC AREA
• BASKETBALL
• PLAY AREA

10. CENTRAL PARK
• PICNIC AREA & BBQS
• SWIMMING POOL
• BASKETBALL COURTS
• SOFTBALL FIELDS
• TENNIS COURTS
• LAWN BOWLS
• PLAY AREA

09. BOWERS PARK
• PICNIC AREA & BBQS
• PLAY AREA

14. JENNY STRAND PARK
• PICNIC AREA & BBQS
• BASKETBALL
• TENNIS COURTS
• PLAY AREA

13. MAYWOOD PARK
• PICNIC AREA & BBQS
• TENNIS COURTS
• PLAY AREA

11. GEORGE F. HAINES INTERNATIONAL

SWIM CENTER
• SWIMMING POOL

07. EVERETT “EDDIE” SOUZA

NEIGHBORHOOD PARK
• COMMUNITY GARDEN
• PLAY AREA
• TENNIS

04. AGNEW PARK
• PICNIC AREA
• BASKETBALL
• PLAY AREA

02. FAIRWAY GLEN PARK
• PICNIC AREA & BBQS
• TENNIS COURTS
• PLAY AREA
El Camino RealEl Camino Real
Figure 03-1_01: Existing Santa Clara Parks
24 280 / Junipero Serra Fwy

28. HENRY SCHMIDT PARK
• PICNIC AREA & BBQS
• BASKETBALL
• SOFTBALL
• TENNIS COURTS
• PLAY AREA

29. PARKWAY PARK
• PICNIC AREA & BBQS
• PLAY AREA

17. THAMIEN PARK
• PICNIC AREA & BBQS
• BASKETBALL
• TENNIS COURTS
• PLAY AREA

18.LIVE OAK PARK
• PICNIC AREA & BBQS
• PLAY AREA19. MONTAGUE SWIM CENTER
• SWIMMING POOL

24. REED AND GRANT SPORTS PARK
• SOCCER FIELD
• PLAY AREA

22. ROTARY PARK
• PICNIC AREA & BBQS
• PLAY AREA

25. LARRY J. MARSALLI PARK
• PICNIC AREA & BBQS
• SOFTBALL
• PLAY AREA

23. RAYMOND G. GAMMA DOG PARK
• DOG PARK

22. WARBURTON PARK & POOL
• PICNIC AREA & BBQS
• SWIMMING POOL
• BASKETBALL
• PLAY AREA

26. FREMONT PARK
• BBQS
• PLAY AREA

27. STEVE CARLI PARK
• BASKETBALL COURT
• PLAY AREA

20. MONTAGUE PARK
• PICNIC AREA & BBQS
• RESTROOMS
• TENNIS COURTS
• PLAY AREA

15. ULISTAC NATURAL AREA
• NATURAL HABITATS 16. LICK MILL PARK
• PICNIC AREA & BBQS
• BASKETBALL
• TENNIS COURTS
• PLAY AREA
*The photos and postcard drawings on the right were created by the community at the 4th of July 2022 Picnic / Community workshop organized by Kylli.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 44 03 I Open Space Standards
In order to create a thriving parkland that all
can enjoy, Kylli and Project Team have hosted
events and workshops, and conducted a public
online survey to invite the wider community
to contribute ideas, feedback and inputs to the
design process. The results of this survey are
available to the public through City of Santa
Clara Park Department. The diversity and
creativity of public participation continues to
be a key source of insight and priority-setting
for the design team. As the site is an important
“center” in the context of Santa Clara and
the Bay, it is crucial that any design bears the
hallmarks of its community.

03.2 COMMUNITY OUTREACH
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 45 03 I Open Space Standards

03.3 SUSTAINABLE LANDSCAPE MEASURES
• Conserve and use native plants
• Manage invasive plants
• Conserve healthy soils and appropriate
vegetation
• Use vegetation to minimize building energy
consumption
• Reduce urban heat island effects
• Manage storm water on site
• Reduce water use for landscape irrigation
by selecting plants with low water needs
• Use recycled water for irrigation and
landscape maintenance and plants that will
thrive using recycled water
• Provide for storage and collection of
recyclables
• Recycle organic matter
Resource ManagementWater ConservationUrban Habitat
The Mission Point project seeks to incorporate
careful analysis and optimization of all site
assets including soil, wind, sun, water, plants
and wildlife, views and connectivity. The
project seeks to creatively address habitat,
air quality, water quality, climate, noise
attenuation, renewable materials, life cycle,
maintenance and energy, as well as social life,
commerce, programming variety, transit and
other design issues to achieve an innovative
and sustainable development. Potential
methods of conservation are as follows:

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 46 03 I Open Space Standards

03.4 PUBLICLY DEDICATED

PARKLAND
A Green Mission Point
As Santa Clara continues to urbanize and
densify, it must also create places of open
space, beauty, serenity, and nature. Such places
will be integrated with the city, with maximum
connectivity and invitations for people to
access, use, and enjoy.

There will be a new neighborhood park,
which will support urban growth throughout
Silicon Valley and around the Bay. The public
parkland is a focal point and catalyst for
community-oriented growth for Santa Clara.

Additional private recreational amenities will
be incorporated throughout the residential and
non-residential podium and terraces.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 47 03 I Open Space Standards
Central Green Area
Gateway Park Area
Tasman Dr.

South Park Area
Private Open space
Santa Clara Trail
SFPUC Right-of-way
Patrick Henry Dr.

Specific Plan
Figure 03-4_01: Illustrative Neighborhood Park Plan
Patrick Henry Dr.

Old Ironside Dr.

Kylli Dr. West Kylli Dr. East
Flexibility for Programming
Mission Point provides an open platform for
multiple forms of programming and activity.

The areas within the new neighborhood park
become critical magnets and centers for events
both small and large, active and passive, some
oriented more to the arts and culture, others to
the environment and education, and still others
to community events as well as to unique large
scale public events.
2 Patrick Henry Dr.

Old Ironside Dr.

Kylli Dr. West Kylli Dr. East
New Santa Clara TrailSFPUC Right-of-way
Tasman Dr.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 48 03 I Open Space Standards
Figure 03-5_01: Illustrative Public Open Space Programming Diagram

03.5 PROGRAMMING

1. TURFED PLAY FIELD

3. OUTDOOR FITNESS

5. FAMILY GATHERING &

PICNIC AREA

7. INFORMAL RECREATION 8. COMMUNITY GARDEN

2. CHILDREN’S PLAY AREA

4. SEATING AREA

6. DOG PARK
Park Program
Mission Point consists of a connected network
of public parks and plazas for active and passive
recreation, community events and programs, as
well as informal or structured social gatherings.

The open space network strives for a diversity
of settings that are flexible to accommodate
active recreational uses and activities for all
ages and abilities.

Refer to Section 05.17 for Park Amenity & Design
Standards.

Tasman Dr.

Patrick Henry Dr.

Old Ironside Dr.

Kylli Dr. West Kylli Dr. East
Upper Terraces Podium Level
SFPUC Right-of-way
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 49 03 I Open Space Standards
Figure 03-5_02: Illustrative Active Recreational Amenity Programming Diagram

1. SWIMMING POOLS WITH

DECK AREA

3. OUTDOOR FITNESS

5. FAMILY GATHERING &

PICNIC AREA

6. RECREATIONAL

COMMUNITY GARDEN

2. CHILDREN’S PLAY AREA

4. SEATING AREA
Active Recreational Amenity Program
The private recreational amenities on the
residential podium will be privately-owned,
open space for residents of the communities.

Programs may include, but may not be limited
to, swimming pools with adjacent deck or lawn
areas, children’s play areas, landscaped and
furnished, park-like quiet areas, recreational
community gardens, outdoor fitness and family
picnic areas.

Refer to Section 05.17 for Active Recreational
Amenity Program Design Standards.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 50 03 I Open Space Standards
Gateway Park Area
Central Green
Park Area
South Park Area
Office Office
OfficeResidential
Kylli Dr. West Kylli Dr. East
Tasman Dr.

Patrick Henry Dr.

Old Ironside Dr.

SFPUC Right-of-way
Patrick Henry Dr.

Specific Plan
Santa Clara Trail
Park Areas
In an effort to create diversity of amenities
across the park, this neighborhood park* has
three character areas: the Gateway Park Area
on the north serves as the gateway to the
Neighborhood Park, the Central Green Park
Area with a focus on the civic functions and
universal appeal, and the South Park Area with
a focus on the community- and family-oriented
activities.

While diversity of character and features is
important, there will be some shared programs
across all park zones including seating areas,
and family gathering space for different users.

Figure 03-5_03: Illustrative Park Areas Diagram
*Per the City of Santa Clara Parks & Recreation Department – Park Amenity & Design Standards, a neighborhood park is a park that is 1-15 acres in size.

See Park Design Standards in Chapter 05.17, on page 105.

Gateway Park Area
The Gateway Park in the north includes a
series of large outdoor rooms for active and
passive programs that will serve both the
general community and adjacent workplaces.

Art installations are some elements that could
anchor the northeast corner and welcome
visitors into the site. A network of pathways
connects the Gateway to the rest of the park
and offers a unique pedestrian experience.

Furnished outdoor rooms with shade trees and
lush vegetation create space for visitors and
office employees to take a break, go for a walk
and socialize.

Tasman Dr.

Patrick Henry Dr.

Old Ironside Dr.

Kylli Dr. West Kylli Dr. East
SFPUC Right-of-way
Open Space Concepts
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 51 03 I Open Space Standards
Please see Figure 03-5_01 for public open space programming legend.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 52 03 I Open Space Standards
Outdoor Fitness
Seating Area
Family Gathering &
Picnic Area
Gateway Park Area
In the Gateway Park Area, the programming
is arranged to welcome visitors and promote
east-west connection, where visitors can walk
across the open space with flexible and direct
routes. The Gateway will include multiple
public use programs. Possible examples include
an outdoor fitness area, seating areas, family
gathering and picnic areas.

Figure 03-5_04: Gateway Park Area Diagram
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 53 03 I Open Space Standards
Central Green Park Area
The Central Green Park Area supports diverse
programming from picnicking and strolling,
to fitness and meditation, to arts and culture
at the center of the park. In this sense, the
Central Green Park Area is designed with a
variety of activities, using both hardscape and
softscape, to attract visitors from surrounding
neighborhoods and visitors from greater Santa
Clara.

Tasman Dr.

Kylli Dr. West Kylli Dr. East
Patrick Henry Dr.

Old Ironside Dr.

SFPUC Right-of-way
Open Space Concepts
Please see Figure 03-5_01 for public open space programming legend.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 54 03 I Open Space Standards
Family Gathering
& Picnic Area
Turfed Play Field
Family Gathering
& Picnic Area
Central Green Park Area
The large area of the central green park
affords a unique experience. This area of the
park is shaped to create “rooms” that support
programming and planting that inhabit the
areas of the Central Green Park Area.

As a complement to the more structured areas
in the northern and the southern portions of
the park, the Central Green Park Area delivers
a tranquil, verdant and activity-oriented space.

Here, visitors can stretch out a blanket for a
picnic or throw a frisbee.

Figure 03-5_05: Illustrative Central Green Park Area Enlarged Plan Outdoor Fitness
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 55 03 I Open Space Standards
Yalp
Tasman Dr.

Patrick Henry Dr.

Old Ironside Dr.

Kylli Dr. West Kylli Dr. East
SFPUC Right-of-way Santa Clara Trail
South Park Area
The South Park Area’s design is community-
and family-oriented due to its proximity to
the residential parcel and its accessibility from
the surrounding residential neighborhoods
at the Patrick Henry Drive Specific Plan
area. Accordingly, the South Park Area may
incorporate a variety of attractions such a
children’s play area, recreational community
gardens, dog parks, a quiet orchard grove
and gardens, and an activity lawn for
accommodating family picnics, events and
informal recreation. The wide range of active
and passive attractions will welcome families
from all around.

Open Space Concepts
Please see Figure 03-5_01 for public open space programming legend.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 56 03 I Open Space Standards
Figure 03-5_06: Illustrative South Park Area Enlarged Plan New Santa Clara Trail
Turfed Play Field
Children’s Play Area
Family Gathering &
Picnic Area
Outdoor
Fitness
Dog Park
SFPUC Right-of-way
Patrick Henry Dr.

Specific Plan
Kylli Dr. West Kylli Dr. East
Informal Recreation
South Park Area
Mission Point will include the new Santa Clara
Trail along the south boundary of the site, a
project that will link Mission Point to future
trails in the surrounding neighborhoods.
*Parkland delivery parcel boundaries are conceptual and to be finalized prior to the Parks Improvement Agreement during design phase.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 57 03 I Open Space Standards
Mission Point will be developed in response
to market demand and has no set order of
development. Dedication of parkland to the City
must be planned to align public safety with the
delivery of usable park without undue impacts
to construction (or construction impacts on
the completed public park). Under the City’s
Park Ordinance (Chapter 17.35 of the City’s
Code), parkland dedication requirements are
tied to residential development, so the delivery
and dedication of public park for Mission Point
will be triggered by the development of the
residential portion (Area D). In addition, to
facilitate delivery of usable public park, the
proposed public park area is anticipated to be
dedicated in three park zones: The Park Parcel
North, Park Parcel Southwest, Park Parcel
Southeast as shown on Figure 03-6_01. Each
parcel will include a minimum of four park
programs and will only be dedicated once
adjacent buildings are completed to ensure
each park parcel will not be disrupted by
construction. Each section of the public park will
function as a complete park on its own. Areas
of the park will likely be developed at separate
times. Together, it will be a single cohesive park
experience for the community. The park must
go through the public outreach process which
begins with the Parks & Recreation Commission
(PRC). The PRC is advisory to Council. It is
Council, through this process, that will approve
the final design.

03.6 PARKLAND DELIVERY
Office
Office
Office
Residential

PARK PARCEL

SOUTHWEST

PARK PARCEL
NORTH

PARK PARCEL

SOUTHEAST
Kylli Dr. West Kylli Dr. East
Tasman Dr.

Patrick Henry Dr.

SFPUC Right-of-way
Patrick Henry Dr.

Specific Plan
Figure 03-6_01: Conceptual Parkland Delivery Parcels
New Santa Clara Trail
Old Ironside Dr.

Upper Terraces
Podium Level
Figure 03-7_01: Illustrative Residential Private Open Space Areas in Area D
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 58 03 I Open Space Standards
Tasman Dr.

Patrick Henry Dr.

Old Ironside Dr.

Residential Podium and Terrace Courtyards &
Amenities
Within the residential community courtyards
and terraces there is an opportunity for a
myriad of programs to provide a healthy active
environment for residents and visitors. The
residential podium landscape, in particular,
will be designed to ensure maximum activity
for future tenants – in the form of functional
features and spaces that support daily life,
activity and wellness.

Kylli Dr. West Kylli Dr. East
SFPUC Right-of-way
Open Space Concepts

03.7 PRIVATE OPEN SPACE
Please see Figure 03-5_02 for private open space programming legend.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 59 03 I Open Space Standards
Accessible Pool & Deck
Children’s Play Area
Furnished Park-like
Quiet Area
Accessible Pool & Deck
Recreational
Community Garden
Family Gathering &
Picnic Area
Outdoor Fitness
Residential Podium and Terrace Courtyards &
Amenities
The residential podium and terrace open
space, and indoor amenity space are seeking
50% credit towards the park fee. Accordingly,
the private open space may include multiple
programs such as swimming pools with
adjacent deck or lawn areas; a children’s play
area; landscaped, furnished and park-like
quiet areas; recreational community gardens;
outdoor fitness spaces; and a family picnic area.

In addition, each building may incorporate
indoor facilities such as fitness classrooms,
gyms, and activity rooms, etc, that are eligible
for private open space credits.

Figure 03-7_02: Illustrative Residential Podium Enlarged Plan in Area D Podium Level
Upper Terraces
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 60 03 I Open Space Standards
Non-Residential Private Open Space
The open space associated with non-
residential uses or circulation areas within each
development area ranges from storm water
treatment areas and landscaped pathways, to
welcome plazas and amenity podiums that offer
a fantastic opportunity for elevated functional
spaces and terraces with panoramic views of
the surroundings, the neighborhood park and
the Bay.

Tasman Dr.

Patrick Henry Dr.

Old Ironside Dr.

Kylli Dr. West Kylli Dr. East
SFPUC Right-of-way
Figure 03-7_03: Conceptual Non-Residential Private Open Space Areas* * No Office/R&D – Residential Flex: If residential units are constructed in Area C a proportional amount of the private open space in Area C will be residential private open space. Private Open Space Concepts SFPUC Right-of-way
Santa Clara Trail
Patrick Henry Dr.

Specific Plan
Existing Bicycle Network Proposed Santa Clara Trail
Legend
Proposed Internal Low-Speed Bicycle Network
Proposed Perimeter Bicycle Circulation Future Trail By Others Proposed Bicycle Parking Facilities Figure 03-8_01: Illustrative Bicycle Circulation Diagram MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 61 03 I Open Space Standards
Bicycle Network
Mission Point’s bicycle network connects to a
larger regional bicycle network.

In addition, the new Santa Clara Trail will be
included in the parkland, adjacent to (but not
a part of) the Hetch Hetchy ROW. Within the
site itself, north-south and east-west bike
paths further establish a connective network
throughout Mission Point. Short-term bike
parking facilities will be provided near bus
stops, buildings and park entrances.

03.8 SITE CIRCULATION
SFPUC Right-of-way
Tasman Dr.

Calabazas Creek
Great America Pkwy
Old Ironside Dr.

Kylli Dr. West Kylli Dr. East
Patrick Henry Dr.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 62 03 I Open Space Standards
Pedestrian Network
The pedestrian network of Mission Point
includes perimeter pathways, sidewalks and
trails, including the Santa Clara Trail to the
south and continuous sidewalks around the
perimeter. Within the site itself, the pedestrian
network provides a series of fully accessible,
meandering pathways that allow visitors to
stroll, jog and circulate through the diverse
outdoor spaces, as well as support clear way-
finding and efficient connections.

SFPUC Right-of-way
Patrick Henry Dr.

Specific Plan
Figure 03-8_02: Illustrative Pedestrian Circulation Diagram Kylli Dr. West Kylli Dr. East
Tasman Dr.

Patrick Henry Dr.

Old Ironside Dr.

Santa Clara Trail

1. The Silver & White Garden

2. The Yellow Garden

3. The Red & Green Garden
Tasman Dr.

Patrick Henry Dr.

Old Ironside Dr.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 63 03 I Open Space Standards

03.9 PLANTING STRATEGIES
SFPUC Right-of-way
Patrick Henry Dr.

Specific Plan
Planting Character Zones
The rich history of the site and its context will
inform the planting design and the species
selection. In general, the planting palettes will
reinforce the three park areas by differentiating
color, character and mix. For example,
the vegetation for each park area may be
characterized by color such as: the “Silver and
White Garden”, the “Yellow Garden” and the
“Red and Green Garden”.

Regardless of the color arrangement, the Park
at Mission Point will incorporate a mixture
of native species and non-invasive, climate-
adaptive species to reflect the modern context
in which the project will sit. Trees will be
native or adaptive species and will be selected
for their suitability as urban plaza or urban
street trees. Selected species will thrive in tree
pit locations with minimum root damage to
sidewalks, and with minimal leaf litter or fruit
drop. Any non-native, introduced species will
have originated in similar coastal regions of the
world that enjoy a Mediterranean-type climate
such as that of the South San Francisco Bay
Area.

The placement of trees will meet utility
clearance requirements for all existing and
proposed utilities. Tree root barrier will be
provided where it is required by the City.

Figure 03-9_01: Illustrative Planting Character Zones

BROAD-LEAF PAPERBARK

MELALEUCA QUINQUENERVIA
GINKGO
GINKGO BILOBA ’ ‘PRINCETON
SENTRY,’ ‘SARATOGA’

LEMON-SCENTED GUM

CORYMBIA CITRIODORA

CALIFORNIA BUCKEYE

AESCULUS CALIFORNICA

STONE PINE

PINUS PINEA

AUSTRALIAN WILLOW

GEIJERA PARVIFLORA
TOYON

HETEOMELES ARBUTIFOLIA

WESTERN HACKBERRY

CELTIS RETICULATA

ELEGANT WATER GUM

TRISTANIOPSIS LAURINA
‘ELEGANT’

CATALINA CHERRY LAUREL

PRUNUS LYONII

WESTERN SYCAMORE

PLATANUS RACEMOSA

CORK OAK

QUERCUS SUBER

PACIFIC MADRONE

ARBUTUS MENZIESII

FRUITLESS OLIVE

OLEA EUROPAEA

PRIMROSE TREE

LAGUNARIA PATERSONII

WATER GUM

TRISTANIOPSIS LAURINA
LOQUAT

ERIOBOTRYA JAPONICA

STREET TREES

PARK SHADE TREES

ACCENT / FLOWERING/ FRUIT TREES

PERIMETER / STORMWATER TREATMENT TREES

AVOCADO

PERSEA AMERICANA

CARA CARA NAVEL
CITRUS × SINENSIS

MULBERRY

MORUS NIGRA
Conceptual Tree Species Examples, subject to change
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 64 03 I Open Space Standards
Drought Tolerant Tree Palette
Plants will be obtained from local nurseries
or regional nurseries located in compatible
climates. Plant material obtained from
commercial nurseries will either be sourced
conventionally or via contract growing,
depending on the quantities and type of plants
specified.

The palette on the right identifies some, but
not all, of the climate-appropriate tree species
that may be considered throughout the parks
and landscapes of Mission Point.

Conceptual Plant Palette Examples, subject to change
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 65 03 I Open Space Standards
Understory Planting Palette
Water Intelligent & Climate-ready Plants
The gardens of Mission Point will be designed
with careful sensitivity to water limitations,
while still featuring colorful native and
adaptive grasses, perennials, flowering shrubs
and succulents. All species will be chosen for
durability, drought-tolerance, recycled water
suitability, flower and foliage coloring, and
structural interest.

The palette on the right represents some
possible climate-appropriate under story
species that may be considered throughout the
park and landscapes of Mission Point.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 04 I Streets and Streetscapes
66 04 | STREETS AND STREETSCAPES
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 04 I Streets and Streetscapes
67 Illustrative visualization of the proposed development MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 68 04 I Streets and Streetscapes

04.1 STREETS AND STREETSCAPE

DESIGN PRINCIPLES
4 3
1 2 2
Figure 04-1: Illustrative Streets and Streetscapes Key Plan 1 2
3 4
Tasman Dr.

Kylli Dr. (West/East)
Patrick Henry Dr.

Old Ironsides Dr.

Principle among the goals of Mission Point
is the ability to inform and improve the
connectivity with and continuity of the
adjacent urban fabric. At the project perimeter,
Tasman Drive is converted into a verdant
boulevard with an active street wall. Patrick
Henry Drive and Old Ironside Drive will
have a similar treatment, but with a more
neighborhood feel.

Kylli Drive (West/East) will be the primary
neighborhood points of entry, linking the
surroundings directly with the parkland and the
development’s interior. Kylli Drive also leads to
underground parking facilities, providing visitor
and commuter access to the park and each
development area.

TASMAN DR.

OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way

SANTA CLARA TRAIL
KYLLI DR. EAST
KYLLI DR. WEST
P
Buffer
Bicycle
Lane
Pedestrian
Clear Area
Landscaping
Landscaping
Buffer
Pedestrian
Clear Area
Sidewalk SidewalkBicycle
Lane
Vehicular Lanes On-Street
Parking or
Landscaping
P. L
P. L
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 69 04 I Streets and Streetscapes

VEHICULAR LANES BICYCLE LANE ON-STREET

PARKING SIDEWALK AREA
Travel Lane
Width (approx.)
Turn Lane
Width (approx.) Classification Lane Width
(approx.)
Parking/
Loading Width
(approx.)
Sidewalk Width
(approx.)
Pedestrian
Clear Area
(approx.)
Landscaping
Area
Tasman Drive 11’ 10’ II 5’-6” Prohibited 12’ 5’ Varies
Kylli Drive
(West/East) 10’ 12’ II 5’-6” 9’ 12’ 5’ Varies
Patrick Henry
Drive 10’ 12’ IV 5’ Lane -3’ Buffer Prohibited 12’ 5’ Varies Old Ironside
Drive 10’ 12’ IV 5’ Lane -3’ Buffer 8’ 12’ 5’ Varies

Figure 04-2_01: Street Typologies & Standards
Figure 04-2_02: Illustrative Street Zones
INTENT
Streets should be designed as complete
streets, and should serve as an extension of
the surrounding street grid and urban fabric.

They should provide safe access across the site
for residents, visitors, and workers, and should
accommodate a broad range of transportation
options. These options include an emphasis on
walkability and bikeability, while balancing the
space for cars, pedestrians, transit, and other
modes of transportation and movement.

GUIDELINES
• Drop-off areas for ride share and other
vehicles such as delivery and servicing
should be located in clearly marked areas,
with minimal impact on pedestrian or
bicycle infrastructure.
• Landscaping such as planted medians
and bulbouts should be considered
for passive storm water management
opportunities.
• Street trees shall be provided at intervals
consistent with SCCC section 18.36.060
[Special Landscape Requirements] Street
trees will not be provided within utility
easements.
• Bicycle lanes should be constructed
consistent with the City of Santa Clara
Bicycle Plan Update. As of 2018, such
lanes are required to be constructed as
Class II Bicycle lanes or better.
*Location of Property Line (PL) will vary
* *

04.2 STREET TYPOLOGIES
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 70 04 I Streets and Streetscapes

STANDARD
• All streets shall generally be designed
to the specifications detailed in Figure
04-2_01.
• The Pedestrian Clear Area shall remain
free of any street furniture, lighting,
planting, or any other permanent or
temporary obstructions.
• A minimum 26’ clear width must be
maintained on any streets or portion
of streets requiring emergency vehicle
access.

Illustrative visualization of the proposed development
OFFICE
VARIES
Landscaping
(Sloped)
Class IV
Bike Lane
Class IV
Bike Lane
Travel
Lane
Striped
Median,
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Neighboring Commercial
Development
Landscaped
(Sloped)
Surface Parking Class II
Bike
Lane
Class II
Bike
Lane
Short Term
Parking/
Landscaping
Short Term
Parking/
Landscaping
Travel
Lane
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Mission Point
Development
Class IV
Bike Lane
Class IV
Bike Lane
Parking ParkingTravel
Lane
Striped
Median/
Turn lane
Travel
Lane
SetbackSidewalk
with
landscaping
Sidewalk
with
landscaping
Neighboring Commercial
Development
Mission Point
Development
Gateway Plaza Area
(Sloped)
Class II
Bike
Lane
Class II
Bike Lane
VTA Light RailLeft Turn
Lane
Travel
Lane
Travel
Lane
Turn Lane Travel
Lane
Sidewalk with
landscaping
Bus
Turnout
Sidewalk
with
landscaping
Mission Point
Development
VARIES~5’-6” ~9’VARIES ~5’-6”~9’~10’ ~12’ ~10’
~5’ ~3’ ~8’ ~5’~8’~10’ ~12’
~ 64.5’ CURB TO CURB
~10’
VARIES

VARIESVARIES
VARIES
MIN. 12’
~5’ ~5’~3’~5’ ~3’ ~10’ ~12.5’ ~10’
~5.5’~5
MIN. 12’ ~37’ to 38’ CURB TO CURB
VARIES ~11’~11’ ~10’
P. L
~3’~5’
~48.6’ CURB TO CURB
P. L
P. L
~ 50’ CURB TO CURB
MIN. 12’
OFFICE
VARIES
Landscaping
(Sloped)
Class IV
Bike Lane
Class IV
Bike Lane
Travel
Lane
Striped
Median,
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Neighboring Commercial
Development
Landscaped
(Sloped)
Surface Parking Class II
Bike
Lane
Class II
Bike
Lane
Short Term
Parking/
Landscaping
Short Term
Parking/
Landscaping
Travel
Lane
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Mission Point
Development
Class IV
Bike Lane
Class IV
Bike Lane
Parking ParkingTravel
Lane
Striped
Median/
Turn lane
Travel
Lane
SetbackSidewalk
with
landscaping
Sidewalk
with
landscaping
Neighboring Commercial
Development
Mission Point
Development
Gateway Plaza Area
(Sloped)
Class II
Bike
Lane
Class II
Bike Lane
VTA Light RailLeft Turn
Lane
Travel
Lane
Travel
Lane
Turn Lane Travel
Lane
Sidewalk with
landscaping
Bus
Turnout
Sidewalk
with
landscaping
Mission Point
Development
VARIES~5’-6” ~9’VARIES ~5’-6”~9’~10’ ~12’ ~10’
~5’ ~3’ ~8’ ~5’~8’~10’ ~12’
~ 64.5’ CURB TO CURB
~10’
VARIES

VARIESVARIES
VARIES
MIN. 12’
~5’ ~5’~3’~5’ ~3’ ~10’ ~12.5’ ~10’
~5.5’~5
MIN. 12’ ~37’ to 38’ CURB TO CURB
VARIES ~11’~11’ ~10’
P. L
~3’~5’
~48.6’ CURB TO CURB
P. L
P. L
~ 50’ CURB TO CURB
MIN. 12’
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 04 I Streets and Streetscapes
71 Tasman Drive is the public view corridor and
multi-modal access to the interior of Mission
Point. As such, it should communicate that the
new development is a comfortable place to live,
work and to be outdoors. The Gateway Park Area
will be allocated on the closest corner to the VTA
light rail with major retail tenants overlooking
this high movement intersection. The design
guiding principle of streetscapes along Tasman
Drive is the creation of continuous pedestrian
driven areas, in the form of wider and shaded
walkways able to accommodate multiple modes
of transportation (bike, car, bus and train).

Tasman Drive includes four to five lanes of traffic,
including two lanes in each direction and one
lane for controlled left turns at the Patrick Henry
and Old Ironsides intersections. Dividing both
vehicular directions is the VTA light rail right
of way that changes width to accommodate
multiple lines and stations. A continuation of the
existing protected bike lane west to east will be
accommodated within the right of way. A deep
profile drop-off area may be placed within the
center of the project frontage and separated by a
pedestrian or green buffer to minimize possible
conflict from drop offs with other infrastructure
such as bike lanes and road intersections.

04.3 TASMAN DRIVE - GATEWAY
Figure 04-3_02: Illustrative Tasman Drive Section
Figure 04-3_01: Illustrative Tasman Drive Plan
Mission Point
Development
RETAIL

PARKING

PARKING

PARKING
OFFICE
OFFICE
Neighboring
Commercial
Development
(By Others)
Neighboring
Commercial
Development
(By Others)
OFFICE
VARIES
Landscaping
(Sloped)
Class IV
Bike Lane
Class IV
Bike Lane
Travel
Lane
Striped
Median,
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Neighboring Commercial
Development
Landscaped
(Sloped)
Surface Parking Class II
Bike
Lane
Class II
Bike
Lane
Short Term
Parking/
Landscaping
Short Term
Parking/
Landscaping
Travel
Lane
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Mission Point
Development
Class IV
Bike Lane
Class IV
Bike Lane
Parking ParkingTravel
Lane
Striped
Median/
Turn lane
Travel
Lane
SetbackSidewalk
with
landscaping
Sidewalk
with
landscaping
Neighboring Commercial
Development
Mission Point
Development
Gateway Plaza Area
(Sloped)
Class II
Bike
Lane
Class II
Bike Lane
VTA Light RailLeft Turn
Lane
Travel
Lane
Travel
Lane
Turn Lane Travel
Lane
Sidewalk with
landscaping
Bus
Turnout
Sidewalk
with
landscaping
Mission Point
Development
VARIES~5’-6” ~9’VARIES ~5’-6”~9’~10’ ~12’ ~10’
~5’ ~3’ ~8’ ~5’~8’~10’ ~12’
~ 64.5’ CURB TO CURB
~10’
VARIES

VARIESVARIES
VARIES
MIN. 12’
~5’ ~5’~3’~5’ ~3’ ~10’ ~12.5’ ~10’
~5.5’~5
MIN. 12’ ~37’ to 38’ CURB TO CURB
VARIES ~11’~11’ ~10’
P. L
~3’~5’
~48.6’ CURB TO CURB
P. L
P. L
~ 50’ CURB TO CURB
MIN. 12’
OFFICE
VARIES
Landscaping
(Sloped)
Class IV
Bike Lane
Class IV
Bike Lane
Travel
Lane
Striped
Median,
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Neighboring Commercial
Development
Landscaped
(Sloped)
Surface Parking Class II
Bike
Lane
Class II
Bike
Lane
Short Term
Parking/
Landscaping
Short Term
Parking/
Landscaping
Travel
Lane
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Mission Point
Development
Class IV
Bike Lane
Class IV
Bike Lane
Parking ParkingTravel
Lane
Striped
Median/
Turn lane
Travel
Lane
SetbackSidewalk
with
landscaping
Sidewalk
with
landscaping
Neighboring Commercial
Development
Mission Point
Development
Gateway Plaza Area
(Sloped)
Class II
Bike
Lane
Class II
Bike Lane
VTA Light RailLeft Turn
Lane
Travel
Lane
Travel
Lane
Turn Lane Travel
Lane
Sidewalk with
landscaping
Bus
Turnout
Sidewalk
with
landscaping
Mission Point
Development
VARIES~5’-6” ~9’VARIES ~5’-6”~9’~10’ ~12’ ~10’
~5’ ~3’ ~8’ ~5’~8’~10’ ~12’
~ 64.5’ CURB TO CURB
~10’
VARIES

VARIESVARIES
VARIES
MIN. 12’
~5’ ~5’~3’~5’ ~3’ ~10’ ~12.5’ ~10’
~5.5’~5
MIN. 12’ ~37’ to 38’ CURB TO CURB
VARIES ~11’~11’ ~10’
P. L
~3’~5’
~48.6’ CURB TO CURB
P. L
P. L
~ 50’ CURB TO CURB
MIN. 12’
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 04 I Streets and Streetscapes
72 Kylli Drive East and West entry ways are the
vehicular gateway to the interior of Mission
Point. Key to the design is the creation of
comfortable pedestrian and bike paths in the
form of continuous green buffers to connect the
surrounding neighborhood to the Central Green
Area, the civic heart of the project.

Each entry way includes three lanes of traffic,
with additional areas for drop-off and short
term parking at the sides. These lanes provide
access to the parking garages within each area,
public access ramps for underground parking
for visitors and drop-off areas. The curb to curb
dimensions allow for any emergency vehicle to
access, turn and drive through the project to
access any podium level building footprint. The
sidewalks along building frontages will include
enough space for street life and green buffers
that provide shaded spaces, a protected bike lane
between tree canopies, and on-street parking.

04.4 KYLLI DRIVE - EAST/WEST
Mission Point
Development
Mission Point
Development
Figure 04-4_02: Illustrative Kylli Drive Section
Figure 04-4_01: Illustrative Kylli Drive Plan

PARKING

PARKING
OFFICE
LOBBY

PARKING

PARKING

PARKING

PARKING

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

PARKING

PARKING

RESIDENTIAL
OFFICE
OFFICE
OFFICE
OFFICE
VARIES
Landscaping
(Sloped)
Class IV
Bike Lane
Class IV
Bike Lane
Travel
Lane
Striped
Median,
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Neighboring Commercial
Development
Landscaped
(Sloped)
Surface Parking Class II
Bike
Lane
Class II
Bike
Lane
Short Term
Parking/
Landscaping
Short Term
Parking/
Landscaping
Travel
Lane
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Mission Point
Development
Class IV
Bike Lane
Class IV
Bike Lane
Parking ParkingTravel
Lane
Striped
Median/
Turn lane
Travel
Lane
SetbackSidewalk
with
landscaping
Sidewalk
with
landscaping
Neighboring Commercial
Development
Mission Point
Development
Gateway Plaza Area
(Sloped)
Class II
Bike
Lane
Class II
Bike Lane
VTA Light RailLeft Turn
Lane
Travel
Lane
Travel
Lane
Turn Lane Travel
Lane
Sidewalk with
landscaping
Bus
Turnout
Sidewalk
with
landscaping
Mission Point
Development
VARIES~5’-6” ~9’VARIES ~5’-6”~9’~10’ ~12’ ~10’
~5’ ~3’ ~8’ ~5’~8’~10’ ~12’
~ 64.5’ CURB TO CURB
~10’
VARIES

VARIESVARIES
VARIES
MIN. 12’
~5’ ~5’~3’~5’ ~3’ ~10’ ~12.5’ ~10’
~5.5’~5
MIN. 12’ ~37’ to 38’ CURB TO CURB
VARIES ~11’~11’ ~10’
P. L
~3’~5’
~48.6’ CURB TO CURB
P. L
P. L
~ 50’ CURB TO CURB
MIN. 12’
OFFICE
VARIES
Landscaping
(Sloped)
Class IV
Bike Lane
Class IV
Bike Lane
Travel
Lane
Striped
Median,
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Neighboring Commercial
Development
Landscaped
(Sloped)
Surface Parking Class II
Bike
Lane
Class II
Bike
Lane
Short Term
Parking/
Landscaping
Short Term
Parking/
Landscaping
Travel
Lane
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Mission Point
Development
Class IV
Bike Lane
Class IV
Bike Lane
Parking ParkingTravel
Lane
Striped
Median/
Turn lane
Travel
Lane
SetbackSidewalk
with
landscaping
Sidewalk
with
landscaping
Neighboring Commercial
Development
Mission Point
Development
Gateway Plaza Area
(Sloped)
Class II
Bike
Lane
Class II
Bike Lane
VTA Light RailLeft Turn
Lane
Travel
Lane
Travel
Lane
Turn Lane Travel
Lane
Sidewalk with
landscaping
Bus
Turnout
Sidewalk
with
landscaping
Mission Point
Development
VARIES~5’-6” ~9’VARIES ~5’-6”~9’~10’ ~12’ ~10’
~5’ ~3’ ~8’ ~5’~8’~10’ ~12’
~ 64.5’ CURB TO CURB
~10’
VARIES

VARIESVARIES
VARIES
MIN. 12’
~5’ ~5’~3’~5’ ~3’ ~10’ ~12.5’ ~10’
~5.5’~5
MIN. 12’ ~37’ to 38’ CURB TO CURB
VARIES ~11’~11’ ~10’
P. L
~3’~5’
~48.6’ CURB TO CURB
P. L
P. L
~ 50’ CURB TO CURB
MIN. 12’
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 04 I Streets and Streetscapes
73 04.5 PATRICK HENRY DRIVE
Figure 04-5_02: Illustrative Patrick Henry Drive Section Figure 04-5_01: Illustrative Patrick Henry Drive Plan
Mission Point
Development
The western boundary of Mission Point
represents a continuation of Patrick Henry Drive,
as it extends north beyond the boundary of the
Patrick Henry Drive Specific Plan (PHDSP) area.

Future development shall remain consistent with
the streetscape design standards established in
the PHDSP .

This street has a narrow right-of-way and curb-
to-curb width that will allow a road design to
accommodate vehicle traffic, protected bicycle
facilities, street trees, creative streetscape
design that enables street activation, and
quiet landscape areas for bio-retention along
the building frontages. To reduce circulation
disruption, vehicular drop-off areas for office
and residential access will be minimized and
consolidated.

PARKING

PARKING

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

RESIDENTIAL

PARKING

RESIDENTIAL
Neighboring
Commercial Development
(By Others)
Neighboring
Commercial Development
(By Others)
OFFICE
VARIES
Landscaping
(Sloped)
Class IV
Bike Lane
Class IV
Bike Lane
Travel
Lane
Striped
Median,
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Neighboring Commercial
Development
Landscaped
(Sloped)
Surface Parking Class II
Bike
Lane
Class II
Bike
Lane
Short Term
Parking/
Landscaping
Short Term
Parking/
Landscaping
Travel
Lane
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Mission Point
Development
Class IV
Bike Lane
Class IV
Bike Lane
Parking ParkingTravel
Lane
Striped
Median/
Turn lane
Travel
Lane
SetbackSidewalk
with
landscaping
Sidewalk
with
landscaping
Neighboring Commercial
Development
Mission Point
Development
Gateway Plaza Area
(Sloped)
Class II
Bike
Lane
Class II
Bike Lane
VTA Light RailLeft Turn
Lane
Travel
Lane
Travel
Lane
Turn Lane Travel
Lane
Sidewalk with
landscaping
Bus
Turnout
Sidewalk
with
landscaping
Mission Point
Development
VARIES~5’-6” ~9’VARIES ~5’-6”~9’~10’ ~12’ ~10’
~5’ ~3’ ~8’ ~5’~8’~10’ ~12’
~ 64.5’ CURB TO CURB
~10’
VARIES

VARIESVARIES
VARIES
MIN. 12’
~5’ ~5’~3’~5’ ~3’ ~10’ ~12.5’ ~10’
~5.5’~5
MIN. 12’ ~37’ to 38’ CURB TO CURB
VARIES ~11’~11’ ~10’
P. L
~3’~5’
~48.6’ CURB TO CURB
P. L
P. L
~ 50’ CURB TO CURB
MIN. 12’
OFFICE
VARIES
Landscaping
(Sloped)
Class IV
Bike Lane
Class IV
Bike Lane
Travel
Lane
Striped
Median,
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Neighboring Commercial
Development
Landscaped
(Sloped)
Surface Parking Class II
Bike
Lane
Class II
Bike
Lane
Short Term
Parking/
Landscaping
Short Term
Parking/
Landscaping
Travel
Lane
Left Turn
Lane
Travel
Lane
Sidewalk
with
landscaping
Sidewalk
with
landscaping
Mission Point
Development
Mission Point
Development
Class IV
Bike Lane
Class IV
Bike Lane
Parking ParkingTravel
Lane
Striped
Median/
Turn lane
Travel
Lane
SetbackSidewalk
with
landscaping
Sidewalk
with
landscaping
Neighboring Commercial
Development
Mission Point
Development
Gateway Plaza Area
(Sloped)
Class II
Bike
Lane
Class II
Bike Lane
VTA Light RailLeft Turn
Lane
Travel
Lane
Travel
Lane
Turn Lane Travel
Lane
Sidewalk with
landscaping
Bus
Turnout
Sidewalk
with
landscaping
Mission Point
Development
VARIES~5’-6” ~9’VARIES ~5’-6”~9’~10’ ~12’ ~10’
~5’ ~3’ ~8’ ~5’~8’~10’ ~12’
~ 64.5’ CURB TO CURB
~10’
VARIES

VARIESVARIES
VARIES
MIN. 12’
~5’ ~5’~3’~5’ ~3’ ~10’ ~12.5’ ~10’
~5.5’~5
MIN. 12’ ~37’ to 38’ CURB TO CURB
VARIES ~11’~11’ ~10’
P. L
~3’~5’
~48.6’ CURB TO CURB
P. L
P. L
~ 50’ CURB TO CURB
MIN. 12’
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 04 I Streets and Streetscapes
74 Similar to Patrick Henry Drive, Old Ironsides
Drive continues on from the PHDSP , and runs
along Mission Point’s entire eastern boundary.

The existing vehicular lane shall remain, with the
biggest change being the introduction of street
parking on the portion of Old Ironsides Drive
that buffers Mission Point. The existing bicycle
lane will be redesigned as a Class IV lane that is
integrated with the sidewalk.

04.6 OLD IRONSIDES DRIVE
Mission Point
Development
Neighboring
Commercial
Development
(By Others)
Neighboring
Commercial
Development
(By Others)
Figure 04-6_02: Illustrative Old Ironsides Drive Section Figure 04-6_01: Illustrative Old Ironsides Drive Plan

PARKING
B.O.H /

SERVICE

PARKING

PARKING

PARKING
OFFICE
OFFICE
OFFICE
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 75 05 I Design Guidelines and Standards

DESIGN GUIDELINES

AND STANDARDS
05 Illustrative visualization of the proposed development MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 76 05 I Design Guidelines and Standards
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 77 05 I Design Guidelines and Standards
Overview
Kylli envisions Mission Point as a thriving
mixed-use neighborhood that facilitates
everyday connections between people, places,
and nature. This document establishes criteria
and standards to govern development, in
accordance with the City of Santa Clara’s
vision. The standards are further designed to be
complementary with the nearby PHDSP .

Design Standards are organized into the
following sections:

Intent
Describes the principal goals, objectives, and
rationale of each topic, as well as alignment of
specific features or provisions with the project
vision, principles, and design.

Guidelines
Preferred specifications or requirements that
are inherently qualitative, and therefore require
interpretation. Guidelines are typically written
as “should” or "may" statements.

Standards
Mandatory, objective, and quantifiable
specifications or other requirements applicable
to the project. Standards are typically written
as “shall” or "must" statements.

Organization
Design standards are integrated throughout
this document as a complementary component
of the overall design vision and narrative. The
topics are not exhaustive, and are intended to
provide a degree of specificity and flexibility
to guide design and development, and better
support the project goals.

The topics addressed throughout the document
fit broadly into three categories:
• Site Design, which engages with the
project area as a whole and establishes
flexible development areas.
• Building Design, which regulates
individual building form, including height
and bulk.
• Open Space, which regulates private and
public open spaces.

Where standards are provided in this
document, they control over any inconsistent
standards in the City of Santa Clara Code
(SCCC). The City’s Zoning Code applies to this
Planned Development zone to the extent not
expressly inconsistent with the express terms
and standards in this PD Zoning. The City of
Santa Clara Parks & Recreation Department’s
Park Design & Amenity Standards must be
followed for any fee credit.

05.1 INTRODUCTION
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 78 05 I Design Guidelines and Standards

A RANGE OF BUILDING TYPES
Mission Point will provide a unique mix of
building types and massing to ensure that
urban character and local identity accompany
the efficiencies and sustainability benefits
inherent to a compact urban neighborhood
engaging with its existing surrounding.

INTERCONNECTED
Working as a whole, the development will
include interconnected buildings at multiple
scales. Design elements may vary including
pedestrian bridges, podium parks, terraces,
balconies, and more.

SUSTAINABLE BY DESIGN
Mission Point’s built environment will aim to
comply with high standards in sustainability,
from the choice of facade materials to the
implementation of energy consumption. Each
individual building will be thought of as a living
organism, able to evolve and give back to its
ecosystem.

INCLUSIVE
Beyond being a mixed use development, each
Area in the development will embody an
inclusive community approach of welcoming
all types of users--from flexible interconnected
office floor plates with high amounts of exterior
spaces to a wide range of residential unit types
for all stages in life.

05.2 SITE DESIGN PRINCIPLES

BUILDING HARMONY
Create a family of places and experiences that
follow a distinctive urban form and support the
range of public open spaces.

ACCESS TO NATURE
Building forms will host a range of outdoor
spaces including balconies, terraces, and
rooftops to allow for seamless connections
with the outdoors.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 79 05 I Design Guidelines and Standards

05.3 MASSING AND ARCHITECTURE
To achieve a pedestrian-friendly environment,
massing and facade details can be controlled in
a way that provides visual interest and makes
a comfortably-scaled environment. Proper
articulation of a building’s facade will support
the richness and variety of the architecture of
Mission Point.

Building scale, massing, and design all play a
key role in defining the aesthetic and physical
quality of a built structure. Buildings should
respect the character of the surrounding
existing buildings with regards to height, scale,
style, and materials.

Building form, mass, and scale should also be
designed to improve the pedestrian realm and
experience, and create transitions to adjacent
lower-density development and other existing
public areas.

Illustrative visualization of the proposed development
B
C
A
D
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 80 05 I Design Guidelines and Standards
INTENT
Buildings in Mission Point should be designed
in a way that integrates with the surrounding
neighborhood, while creating a new, dynamic,
and engaging mixed-use district that is
pedestrian-oriented and human-scaled.

GUIDELINE
• Planning Areas should establish a
localized set of standards to encourage a
consistent pattern of development.

STANDARD
• Buildings in Mission Point shall be
situated in one of four Program Areas, as
identified in Figure 05-3_01.
• A building's ground floor shall adhere to
the applicable height standards described
in Figure 05-3_02.

Figure 05-3_01: Program Areas
Figure 05-3_02: Development Ground Floor Height Standards * Not applicable to ground floor parking
^ Not applicable to residential-specific community uses, common areas, or flex areas, such as lobbies, gyms, leasing office or retail below residential

PROGRAM AREA A PROGRAM AREA B PROGRAM AREA C PROGRAM AREA D

GROUND FLOOR
Ground floor height, non-residential (ft)* Approx. 20’ Approx. 20’ Approx. 20’ Approx. 20' Ground floor height, residential (ft)*^ Approx. 10'-12' Approx. 10'-12' Approx. 10'-12' Approx. 10'-12'

* Note that Figure 05-3_01's demarcated areas are approximate and subject to change based on development plans.

A
B
C
D
OLD IRONSIDES DR.

PATRICK HENRY DR.

TASMAN DR.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 81 05 I Design Guidelines and Standards
INTENT
Building heights in Mission Point should be
cohesive and complementary of the uses and
activities occurring at both the ground plane and
upper building levels.

GUIDELINES
• Building height should vary across the site
to create a visually engaging environment,
making use of different tower heights to
pair with consistent podium and ground
floor spaces.

STANDARDS
• All building heights shall be consistent
with the definition of Height (Structure) in
SCCC section 18.160.080. ["H" Definitions]
• All building heights shall be limited to the
Federal Aviation Administration (FAA)
requirement.
• All buildings shall generally adhere to the
heights identified in Figure 05-4_01.

05.4 BUILDING HEIGHTS
* Approximate heights are based on the definition of Height (structure) in SCCC section 18.160.080, where “Height is the vertical distance from the 'grade' to the highest point of the coping that defines the volume of the building of a flat roof, or to the deck line of a mansard roof, or to the highest gable of a pitched or hipped roof.” The definition of Grade, Finished is "The surface of the ground or pavement at a stated location as it exists after completion of a project." SCCC section 18.160.070 ["G" Definitions].
** All building heights (including antennas, chimneys, elevators, radio towers, mechanical appurtenances, parapets, and screens) are subject to Federal Aviation Administration height restrictions.

PATRICK HENRY

SPECIFIC PLAN
H. 22’ (approx.)

CENTRAL

GREEN AREA
+0.00

GATEWAY

PLAZA AREA
SOUTH

PARK AREA

SANTA CLARA
TRAIL
SFPUC Right-of-way

PROGRAM AREA - B
STORIES: APPROX. 4-11
HEIGHT: APPROX. 47’-153’
N

PROGRAM AREA - A
STORIES: APPROX. 3- 9
HEIGHT: APPROX. 33’-123’

PROGRAM AREA - C
STORIES: APPROX. 3-9
HEIGHT: APPROX. 33’-123’

PROGRAM AREA - D
STORIES: APPROX. 2-19
HEIGHT: APPROX. 22’-192’
Figure 05-4_01: Illustrative Massing and Height Diagram SETBACKS (Minimum)
SETBACKS* (ft) A B C D Residential 10 10 10 10
Mixed-Use 0 0 0 0
Office 0 0 0 0
* All setbacks are to be measured from the property line.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 82 05 I Design Guidelines and Standards

05.5 SETBACKS
The setback area is defined as the distance a
structure, parking area, or other development
feature must be separated from the property
line.

INTENT
Setbacks create a transition space between
the public and private realm. The goal is to
encourage people to occupy and enliven the
setback areas and help define the physical
and social character of Mission Point. Where
privacy is preferred, setback areas can be
landscaped and screened with planting.

GUIDELINES
• Landscaping in setback areas should
incorporate water intelligent and climate-
ready plants, and also incorporate best
practices in sustainable storm water
management.
• Improvements to setback areas within
Silicon Valley Power (SVP) easements
should comply with applicable SVP
guidelines.
• There should be a minimum 10-foot
setback between the public park and the
private buildings.

STANDARDS
• All buildings shall adhere to setback
requirements as identified in Figure 05-
5_01.
• Active uses that may encroach upon the
setback area include building terraces,
balconies, ramps, planters, fences, retail
stands, outdoor seating, and dining
places, or similar active uses, to engage
the edge of the public realm and create
active frontages.
• Buildings within Mission Point shall
comply with requirements detailed in
SCCC Section 18.30.050 [Setbacks -
Measurement and Requirements] minor
modifications may be granted pursuant
to SCCC Chapter 18.124.

Figure 05-5_01: Setback Standards
Figure 05-5_02: Illustrative Setback Diagram.

Structure Edge

SETBACK
Property Line

STEP BACK DEPTH

HEIGHT OF

STEP BACK
Building edge
Setback
Property Line
Figure 05-6_01: Illustrative Step Back Diagram
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 83 05 I Design Guidelines and Standards
INTENT
Step backs serve to reduce the perceived mass
of buildings above the street wall in order to
retain adequate solar access, maintain sense
of openness between buildings, mitigate
wind effects, and reinforce the ground-level
experience.

GUIDELINES
• Step backs should be integrated into
building design to ensure that building
heights respond to the character of
the areas adjacent to Mission Point,
while accommodating high-density
development.
• Average step back of approximately 5' for
a minimum of 50% of all public frontages.

STANDARDS
• For non-residential buildings longer than
330', articulation shall be provided to
break the massing.
• For residential buildings (including
mixed-use), provide step backs for
buildings greater than 85' of occupied
height.
• Balconies, recesses, and other private
open space uses such as terraces shall be
allowed in the step back area.

05.6 STEP BACKS
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 84 05 I Design Guidelines and Standards
INTENT
Mission Point’s street design provides a
welcoming, comfortable, and safe environment for
walkers and cyclists, while efficiently circulating
necessary vehicle traffic. The plan categorizes
streets and other transportation infrastructure
based on their function and adjoining land uses to
maintain a balanced multi-modal transportation
network.

GUIDELINE
• The streets within the site should be
designed as complete streets. Complete
Streets, as defined by the Santa Clara
Valley Transportation Authority, are “roads
designed with all users in mind: pedestrians,
cyclists, motorists, and public transit riders
of all ages and abilities.” [https://www.vta.
org/programs/complete-streets-program]

STANDARD
• All roadways shall be constructed to
accommodate a variety of vehicles and shall
take into consideration service, delivery, and
emergency vehicles, as well as anticipated
vehicular traffic volumes appropiate to the
location and function.
• Pedestrian and bicycle connections within
and around Mission Point shall be safe and
convenient.
• The Project design shall comply with the
current version of the City Complete Streets
Policy.

05.7 CIRCULATION
Illustrative visualization of the proposed development
OUTOUT
IN IN
ININ
IN IN
IN IN
IN
OUT
OUT
IN
ININ
IN IN
ININ

OUT OUT

OUT OUT

OUT OUTOUT OUT
OUT

OUT OUT

OUT OUT

RAMP DOWN
IN
ININ

OUT OUT
OUT
IN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP UP
TO L2

RAMP UP
TO L2

RAMP UP
TO L2

RAMP DOWN

RAMP DOWN

RAMP DOWN

DROP-OFFDROP-OFF
OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way
Figure 05-7_01:

Illustrative Tenant Access
and Circulation (Level 1)

SANTA CLARA TRAIL
TASMAN DR.

N
0’ 100’50’ 200’ 400’

DROP-OFF

DROP-OFF

DROP-OFF

DROP-OFF
KYLLI DR. EAST
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 85 05 I Design Guidelines and Standards

SUBSTATION
KYLLI DR. WEST
Residential Amenity Space
Office Amenity Space
Long Term Bike Parking
Lobby/Entry
Tenant Dedicated L1 Parking
Shuttle/Vehicular Drop-off
Vehicular Drop-off
Parking Speed Ramp
Pedestrian Access
Vehicular Circulation (IN)
Vehicular Circulation (OUT)
P

DROP-OFF

DROP-OFF
P
PP
P
TASMAN DR.

OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way
Figure 05-7_02:

Illustrative Tenant Access
and Circulation (Podium)

SANTA CLARA TRAIL
N
0’ 100’50’ 200’ 400’
KYLLI DR. EAST
KYLLI DR. WEST
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 86 05 I Design Guidelines and Standards

SUBSTATION
Residential Amenity Space
Office Amenity Space
Lobby/Entry
Office Podium Circulation
Residential Podium Circulation

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 87 05 I Design Guidelines and Standards
Vehicular Parking
An assessment of the parking supply and
demand has been completed to ensure that
sufficient parking is provided. Parking needs
will change over time, and guidelines and
standards have been written to provide
flexibility.

INTENT
Mission Point will provide sufficient and flexible
vehicular parking to meet current and future
demand.

GUIDELINE
• Parking should allow for a shared parking
model.
• Mechanical lifts/stackers may be used to
satisfy any required parking.
• Surface parking should be limited on site.
• Parking stall quantities requirements
should generally adhere to those
identified in Figure 02-7_01.

STANDARD
• Above-grade podium parking shall
include programmatic or architectural
treatments around perimeter edges to
lessen the aesthetic impact and maintain
pedestrian engagement at ground level.
• Below grade parking shall be exempt
from any standards or requirements
specified in SCCC section 18.30.070.
[Basements]
Figure 05-8_01: Conceptual Parking Locations
LEVEL 3 LEVEL 4
A
D B
RESI
OFFICE
OFFICE
N
BASEMENT LEVEL 2
DRESI
PUBLIC

A OFFICE
DRESI

A OFFICE

B OFFICE

COFFICE

A OFFICE

B OFFICE

COFFICE

B OFFICE

COFFICE

GROUND FLOOR
N N
NN

B OFFICE

COFFICE

05.8 PARKING
11 Bicycle Plan Update 2018 City of Santa Clara
Santa Clara Today
Class II Bicycle Lanes
Class II bicycle lanes are striped preferential lanes on the roadway for one-way bicycle travel. Some bicycle
lanes include a striped buffer on one or both sides
to increase separation from the traffic lane or from
parked cars, where people may open doors into the
bicycle lane.

There are currently 34 miles of Class II bicycle lanes
in Santa Clara.

Class III Bicycle Routes
Class III bicycle routes are signed routes where people bicycling share a travel lane with people driving.

Because they are shared facilities, bicycle routes
are most appropriate for low-speed and low-volume
streets. However, Santa Clara County classifies the
County expressways as Class III bicycle routes, with
bicycle travel generally expected in the shoulder.

Although there are bicycle routes on some of the
expressways, the expressways should only be used by
bicyclists with advanced skills. Some Class III bicycle routes include shared lane markings or “sharrows”
that recommend proper bicycle positioning in
the center of the travel lane and alert drivers that
bicyclists may be present.

There are currently 24.5 miles of Class III bicycle
routes in Santa Clara, which includes bicycle routes on expressways.

Bicycle Plan Update 2018 City of Santa Clara 12
Santa Clara Today
Class IV Separated Bikeways
Class IV separated bikeways are on-street bicycle
facilities that are physically separated from motor
vehicle traffic by a vertical element or barrier, such
as a curb, bollards, or vehicle parking aisle. They can allow for one- or two-way travel on one or both sides
of the roadway.

No Class IV separated bikeways exist in Santa Clara.

Barriers to Active Transportation
Two freeways cross the City: Highway 101 runs east-
west through Santa Clara and State Route (SR) 237
runs east-west along the top border of the city. The
Caltrain rail line also runs east-west through the
City, south of Highway 101. San Tomas Expressway/
Montague Expressway runs north-south through the
center of the city, Lawrence Expressway runs along
much of the western border of the city, and Central
Expressway runs east-west through the city south of
Highway 101. These transportation features create
challenges for people walking and bicycling in some
places, as crossings are limited.

Figure 05-8_03: Conceptual Bicycle Parking Ratios
Figure 05-8_02: Class II and IV Bicycle Lane Descriptions Images and text from “City of Santa Clara Bicycle Plan Update 2018.” *Based on SCCC, § 18.38.050
^The minimum number of required long-term bicycle parking spaces is 4, except when the code would require 1 or less, in which case, 2 bicycle spaces must be provided
**Class I Bicycle Parking facilities may also include stacked bicycle racks located within secure lockers, rooms with key access for regular bicycle commuters, valet, or check-in parking, and/or guarded parking areas.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 88 05 I Design Guidelines and Standards
Bicycle Parking and Infrastructure
INTENT
Mission Point provides a complete network of
bicycle infrastructure, including protected or
buffered bike lanes around the site perimeter, clear
pathways through the site interior, and a multi-use
trail system along the southern edge of the site.

Convenient and safe bike parking options and
self-service repair amenities will further encourage
healthy mobility and decrease vehicular traffic.

GUIDELINE
• All street frontages bordering Mission
Point should contribute to the overall
city-wide bicycle network by providing
designated bicycle lanes.

STANDARD
• All bicycle lanes in Mission Point shall
be designed to Caltrans and National
Association of City Transportation Officials
(NACTO) standards.
• Class II and IV bicycle lanes shall be
consistent with the requirements of the
City of Santa Clara Bicycle Plan.
• All buildings shall provide access to on-site
bicycle facilities as identified in Figure 05-
8_05.
• Bicycle parking counts shall adhere to the
quantities identified in Figure 05-8_03.

BICYCLE PARKING STANDARDS
CITY ZONING REQUIREMENTS*^
USE LONG TERM (CLASS I)** SHORT TERM (CLASS II)
Office 1 per 20 rooms + 1 per 20 employees 1 per 20 rooms Retail 1 per 20 employees 1 per 4,000 gsf
Residential 1 per dwelling unit 1 per 20 dwelling units Childcare 1 per 20 employees 1 per 40 children

VEHICULAR TUNEL CONNECTION

VEHICULAR TUNELL CONNECTION

RAMP UP

RAMP UP
RAMP DOWN TO B1
RAMP DOWN TO B1
RAMP UP FROM B1
RAMP UP FROM B1

RAMP UP

RAMP UP

RAMP UP

RAMP UP

RAMP UP

RAMP FROM ABOVE
P
P
P
PP
P P
P
P P
P P
P
P
N
0’ 100’50’ 200’ 400’
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 89 05 I Design Guidelines and Standards
OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way

SUBSTATION
TASMAN DR.

Shared Parking
Ramp from/to L1
Vehicular Circulation
Office Lobby
Residential Lobby
P
Figure 05-8_04:

Illustrative Parking Access
and Circulation (Basement)
OUTOUT
IN IN
ININ
IN IN
IN IN
IN
OUT
OUT
IN
ININ
IN IN
ININ

OUT OUT

OUT OUT

OUT OUTOUT OUT
OUT

OUT OUT

OUT OUT

RAMP DOWN
IN
ININ

OUT OUT
OUT
IN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP UP
TO L2

RAMP UP
TO L2

RAMP UP
TO L2

RAMP DOWN

RAMP DOWN

RAMP DOWN
P
PP
P
P
P
P P
P
P
P
P
Figure 05-8_05:

Illustrative Bicycle
Infrastructure & Parking
OLD IRONSIDE DR.

PATRICK HENRY DR
TASMAN DR.

N
0’ 100’50’ 200’ 400’

SANTA CLARA TRAIL
KYLLI DR. EAST
KYLLI DR. WEST
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 90 05 I Design Guidelines and Standards

SUBSTATION
SFPUC Right-of-way
Long Term Bike Parking
Short Term Bike Parking
Tasman Bike Lane (Class II)
External Bike Lane (Class IV)
Internal Bike Lane (Class II)
Internal Shared Bike Path
Multi-Use Trail
EVA Path
P

* Note that the project will generally comply with the "City of Santa Clara Development Guidelines for Solid Waste Services" provisions for Mixed Use developments except with those under "Collection truck access". The developer reserves the right to make exceptions in the future.

Figure 05-9_01: Conceptual Loading Bay Quantities
^ Off-street loading is only required for portions of the building dedicated to non-residential uses (including retail and day care facilities)
** Based on SCCC, § 18.38.070.

OFF-STREET LOADING**

AREA SPACES SIZE
A
1 Space / 20,000 gsf
+ 1 Space / each additional 100,000
gsf above 100,000 gsf
30' (L) x 12' (W) x 15' (H)B
C^
D^
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 91 05 I Design Guidelines and Standards
Off-Street Loading
INTENT
The site has been designed to provide sufficient
space to support optimal delivery, servicing, and
waste operations. The site will provide shared
demand loading facilities through a combination
of centralized docks per podium and smaller
periphery bays. The goal is to increase efficiency,
safety, and quality of life for delivery, service
employees, residents and tenants.

GUIDELINE
• All building services (trash*, deliveries,
loading, etc.) should be centralized within
each podium.
• Where possible, service zones should
be shared across multiple buildings and
programs.
• Strategies such as scheduling deliveries,
off-peak hour deliveries, and right-sizing
freight vehicles should be considered for
residential and commercial tenants.

STANDARD
• Service access shall be provided for each
individual building.
• Provision of internal loading bays shall
adhere to the requirements in Figure 05-
9_01.
• Internal loading facilities shall generally
adhere to the locations identified in
Figure 05-9_02.

05.9 LOADING & SERVICE ACCESS
OUTOUT
IN IN
ININ
IN IN
IN IN
IN
OUT
OUT
IN
ININ
IN IN
ININ

OUT OUT

OUT OUT

OUT OUTOUT OUT
OUT

OUT OUT

OUT OUT

RAMP DOWN
IN
ININ

OUT OUT
OUT
IN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP UP
TO L2

RAMP UP
TO L2

RAMP UP
TO L2

RAMP DOWN

RAMP DOWN

RAMP DOWN
OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way
Figure 05-9_02:

Illustrative Service Access
and Circulation

SANTA CLARA TRAIL
TASMAN DR.

N
0’ 100’50’ 200’ 400’
KYLLI DR. EAST
KYLLI DR. WEST
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 92 05 I Design Guidelines and Standards

SUBSTATION
Main Loading/Unloading
Staging Area
Path to Secondary Loading
Service Path to/from Loading
Retail Area
Secondary Loading/Unloading
Staging Area
BOH & Compactor
Vehicular Ingress
Vehicular Egress
External Vehicular Circulation
Substation Service In/Egress

EXTERIOR
(PATRICK HENRY DR)

INTERIOR
(PODIUM)

PARKLAND
RETAIL
LOBBY
EVA

FIRE ACCESS

SERVICE ELEVATOR

FIRE ACCESS

SERVICE ELEVATOR

PARKING

PARKING

PARKING
+0.00’ +3.00’
+33.0’ / +22.0’

PUBLIC ROADWAY

ELEVATION

OFFICE/RESIDENTIAL

PODIUM ELEVATION

PARKING

PARKING

PARKING

PARKING

PARKING
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
Figure 05-9_03: Illustrative EVA Section (‘Area’ A shown, typical all ‘Areas’) MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 93 05 I Design Guidelines and Standards
16' MINIMUM

CLEARANCE HEIGHT
Emergency Vehicle Access
INTENT
The primary fire access strategy for Mission
Point is to provide necessary clearances within
or around the combined parking podiums for
direct access to dedicated Fire Service Access
Elevators (FSAE) at each building.

GUIDELINE
• A clear path of travel should be
maintained in all buildings, open spaces,
streets, and pathways in order to
accommodate emergency vehicles (EVA).
• An EVA Circulation Plan should generally
adhere to the locations identified in
Figure 05-9_04.

STANDARD*
• An EVA Circulation Plan shall be
implemented across the entire plan area.
• All roadways shall maintain a minimum
horizontal clearance of 26’ for EVA
circulation, and a minimum 20’ at entries.
• EVA paths, except along the new Santa
Clara Trail, must not be within a park parcel.

This exception shall require a minimum 20-
foot clear path of travel width.
• EVA path of travel under building podiums
shall have a minimum floor-to-ceiling
clearance of 16'.
• Building podiums shall provide access
within or around for EVA, staging areas and
direct travel path to the FSAE.
• All fire access roads shall maintain a
minimum turning radius of 30’, and a
maximum slope of 10%.

Exterior EVA, Staging, and FSAE Access Podium EVA, Staging, and FSAE Access * Note that future mitigation measures will be included as part of an alternative means and methods as deemed necessary by the Santa Clara Fire Dept.

OUTOUT
IN IN
ININ
IN IN
IN IN
IN
OUT
OUT
IN
ININ
IN IN
ININ

OUT OUT

OUT OUT

OUT OUTOUT OUT
OUT

OUT OUT

OUT OUT

RAMP DOWN
IN
ININ

OUT OUT
OUT
IN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP DOWN

RAMP UP
TO L2

RAMP UP
TO L2

RAMP UP
TO L2

RAMP DOWN

RAMP DOWN

RAMP DOWN
OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way
Figure 05-9_04:

Illustrative Emergency Vehicle
Access & Circulation Strategy

SANTA CLARA TRAIL
TASMAN DR.

N
0’ 100’50’ 200’ 400’
KYLLI DR. EAST
KYLLI DR. WEST
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 94 05 I Design Guidelines and Standards

SUBSTATION
20’ WIDTH MIN.

MINIMUM 26’ CIRCULATION
WIDTH, TYP .

MINIMUM 30’ TURNING
RADIUS, TYP .

MAXIMUM PATH
OF TRAVEL 90’, TYP .
30’ MULTI-USE TRAIL
20’ SHARED VEHICULAR EVA ACCESS ONLY
MINIMUM 20’ WIDTH AT
ENTRIES, TYP .

External Vehicular Access
EVA East-West Connection
Site Vehicular Path
Emergency Vehicle Staging Area
Path of Travel to FSAE
Fire Service Access Elevator
Podium Vehicular Path
Emergency Vehicle Staging Area
Path of Travel to FSAE
Fire Service Access Elevator
EVA Lane

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 95 05 I Design Guidelines and Standards

NEIGHBORHOOD CONTEXT
Buildings should be scaled to respond to their
context by sensitively and positively addressing
the scale and massing of their adjacent
neighbors and the development trends of the
region.

MASSING VARIATION
Varied building heights are encouraged as they
provide visual interest and suggest the appearance
and scale of smaller structures.

MASSING TRANSITIONS
In addition to the step backs required for
residential buildings in Section 05.6, step backs
in all types of buildings are encouraged to
be used as a means of transitioning building
heights.

FACADE RHYTHM
Complementary textures, colors, materials,
and distinctive architectural treatments should
alternate to add visual interest, while avoiding
dull and repetitive facades.

ARCHITECTURAL DETAILS
Architectural details should be used to enhance
the scale and interest of a building’s facade
by breaking it up into distinct planes that are
offset from the main building facade.

BALCONIES
The use of balconies help break down the scale
of the facade and allow for usable outdoor
space, which enhances wellness.

05.10 BUILDING DESIGN PRINCIPLES
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 96 05 I Design Guidelines and Standards
Building modulation along the facade can be
achieved using any application of change in
plane. Means of applying a change in facade
plane include, but are not limited to:

1. Contextual Response
Buildings can be scaled to respond to their
context by sensitively and positively addressing
the scale and massing design, relative to
neighboring parcels.

2. Change in Plane
• Architectural details, Structural
Expression
• Volumetric Notches (balconies)
• Massing Transitions: Volumetric recesses
(Step backs)
• Facade Rhythm

3. Change in Facade Systems
Long facade systems may be divided into
smaller components through variation in
materials, articulation, fenestration, and
so forth. Complimentary textures, colors,
materials, and distinctive architectural
treatments should alternate to add visual
interest, while avoiding repetitive facades.

INTENT
To achieve a pedestrian-friendly environment,
massing and facade details can be controlled to
provide visual interest and makes a comfortably
scaled environment.

Building Modulation (or “Modulation”) is
necessary to achieve visual interest, rhythm,
and human-scaled dimensions. Modulation can
also be used for functional purposes, such as
producing recesses that can be used as patios
or balconies.

GUIDELINES
• Variation in the use of colors, materials,
fenestration patterns, and other
architectural elements should be
considered in building design.
• Low-rise buildings, or the lower portions
of buildings such as the podium levels,
should be broken up into smaller
massing by utilizing major breaks in the
building facade and roof line. A change
in colors or materials may also create
greater visual variation.
• Tall buildings and tower tops may be
articulated in a manner that provides
visual interest and confers visibility
and distinctiveness when viewed from
outside the project area.
• Blank walls or long spans of non-
transparent facades should be avoided.

05.11 MODULATION AND FACADES
Facade Design Concepts
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 97 05 I Design Guidelines and Standards
• Facades should be glazed using materials
that consider energy performance.

Glazing should be generally light
in color and of low reflectance to
achieve a balance of daylighting and
energy performance, and also provide
transparency and engagement between
interior and exterior spaces.
• Glazing selection should consider bird
safety and other environmental factors

STANDARDS
• Buildings shall adhere to the modulation
standards identified in Figure 05-11_01.
• Major breaks shall be provided based
on the streetwall modulation intervals
identified in Figure 05-11_01. Break shall
generally occur along both the building
facade and the roof line.
• Where mixed-use buildings feature both
residential and non-residential uses
on the ground floor, the ground floor
transparency requirements shall only
apply to the non-residential spaces. Non-
residential transparency requirements
shall also apply to those areas associated
with residential uses such as a private
gym or leasing area.

OFFICE RESIDENTIAL

MODULATION & FACADES
Streetwall Modulation Approx. 200’ Approx. 150’
Building Separation Approx. 40' Min. Approx. 40' Min.

GROUND FLOOR
Ground floor transparency
Office: Approx. 50% Residential: None
Retail: Approx. 65% Retail: Approx. 65%
Figure 05-11_01: Modulation and Facade Standards
Figure 05-11_02: Illustrative Modulation Diagram
Property Line

BUILDING SEPARATION

STREETWALL MODULATION
Major Break

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 98 05 I Design Guidelines and Standards

05.12 OFFICE DESIGN
INTENT
Office buildings should have flexible and
technologically advanced working and
meeting environments that are engaging,
healthy, comfortable, durable, aesthetically
pleasing, and accessible. They should be
able to accommodate the specific space and
equipment needs for various meeting sizes, or
of an individual tenant.

GUIDELINES
• Office buildings should have lobby access
adjacent to public outdoor spaces, and be
clearly visible during day- and night-time
hours.
• Multi-level interconnections should
be considered to connect the ground
floor and podium levels to the street.

Interconnections may include bridges and
terraces, that allow for a mixture of users
to engage with other buildings.

STANDARDS
• Office buildings shall provide 50 percent
visual transparency along all building
facades. Where mixed-use buildings
feature ground floor retail, the ground
floor requirements shall apply, as shown
on Figure 05-11_01.
• Office buildings shall have a primary
entrance design that strengthens the
public realm, supports office activity, and
creates pedestrian comfort and safety.
• Office buildings shall have one main
entrance for staff, visitors, and the public,
including an entry lobby that is inviting,
well-lit and secure.

Office Design Concepts
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 99 05 I Design Guidelines and Standards

05.13 RESIDENTIAL DESIGN
INTENT
Residential buildings provide a large number of
homes and an efficient use of land area, helping
to focus density and create valuable open space
for all residents and neighbors.

GUIDELINES
• Residential buildings should be designed to
convey individual residential uses. Building
architectural features may be layered to
emphasize certain features of the building
such as entries, corners, and organization
of units.
• Strong relationships between the private
and public realms, especially at the podium
level, may be established by locating decks,
porches, and patios where they can face
dedicated public outdoor spaces.
• Tenant amenity areas, such as entry lobby
or community space, should have direct
access from the public realm.
• Through-block connections are encouraged,
as they provide alternative pedestrian
routes through the building, especially for
children, and connect to public amenities
and open space areas.
• Building facades should be articulated to
express the scale of individual residential
units and to reduce the apparent mass of
the overall building.

Figure 05-13_01: I
Illustrative Residential Concept Diagram
Ground Floor Frontages & Entries
Base Building Massing
Building Architectural Features
Accessible Amenities Layering

1. 2.

3. 4.

1. 2.

3. 4.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 100
05 I Design Guidelines and Standards
• The base of buildings should incorporate
elements that reflect a pedestrian scale
and include active ground floor uses, such
as lobbies that are well lit and inviting.
• Ground-floor residential uses may be
raised above adjacent sidewalks, provided
accessibility issues are adequately
addressed.
• Ground floor residential frontages
should be designed where possible to
activate the transition space between
private living areas and the public realm.

This may be accomplished by orienting
primary home entries on the ground floor
towards adjacent public amenity areas,
open spaces, lanes or public rights-of-
way.

STANDARDS
• All ground floor residential entries, such
as stoops, terraces, or stairs, shall meet all
universal accessibility standards.
• As used in this document, a “townhome”
is a one-family dwelling that is a part of a
group of three or more such units separated
by a common party wall, with each unit
having their own front entrances.
• As used in this document, an “additional
multifamily unit” is a condominium, coop
or apartment unit lacking its own front
entrance.
• Townhomes are only permitted as follows:
•Townhomes designed and integrated
as part of a multi-family building in
which additional multi-family units are
included above the townhome unit
(entire building must achieve a minimum
60 du/ac); or,
• Townhomes integrated as part of a multi-
family building without additional multi-
family units above, not to exceed 25% of
the buildable land area for area C and D (in
Area C, if residential is constructed, and
in Area D, entire building must achieve a
minimum of 60 du/ac).
• The following are prohibited: (1) Standalone
townhomes without additional multifamily
units, (2) and single family detached units,
and (3) duplexes.
• Area D must have a minimum aggregate
residential density of 60 units per acre. Based
on the 13.7-acre size of area D, this yields
820 total residential units in Area D. This is
the minimum number of units the Project
must achieve within Area D. If the residential
units are constructed under the Office/R&D
– Residential Flex option, Area C must have
a minimum aggregate residential density of
60 units per acre. Based on the 12.7-acre size,
if all of Area C were to be developed with
residential, this yields 782 total residential
units in Area C. This is the minimum number
of units the Project must achieve within Area
C, if residential units are constructed on the
entirety of Area C under the Office/R&D
– Residential Flex option. If, for example,
a 1-acre portion of Area C were to be
redeveloped with residential, it would need to
yield a minimum of 60 units. Concurrent with
any Architectural Review Permit submittal, the
project shall demonstrate how the minimum
number of units will be achieved. If future
projects would need to have an average
density of more than 60 du/acre to reach the
minimum, a density study must be submitted
concurrent with the Architectural Review
Permit submittal demonstrating how the
minimum number of units will be achieved for
Area D. The City may deny any Architectural
Review Permit based on a finding that approval
would make achievement of residential unit
minimums infeasible.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 101
05 I Design Guidelines and Standards

05.14 GROUND FLOOR
The ground floor is where the activity of the
building meets the public realm. The ground
floor plays a critical role in shaping the
pedestrian experience. A vibrant ground floor
experience is dependent upon many different
uses, varied to provide a nuanced and unique
pedestrian street experience.

INTENT
Ground floors allow buildings to maintain
an active presence at the pedestrian level by
providing a transitional space between the
public and private realm. Ground floors play
an important role in facilitating internal and
external circulation, and create space that
engages building occupants with the public
realm.

GUIDELINES
• Ground floor retail frontages should
be expressed with a finer grain of
architectural detailing and facade
treatments that are scaled to human
activity on the street. This may include
architectural elements such as canopies,
awnings, overhangs, projections, and
recesses.
• Most of the ground floor between the
heights of 4 and 8 feet for residential uses
and 0 to 12 feet of non-residential uses
should be devoted to transparent windows
and doors to increase visual access, and
allow maximum visual interaction between
the sidewalk areas and the interior spaces.
• Active uses should be prioritized on the
ground floor of buildings with designated
retail area, excluding spaces for parking
and loading access, building egress,
building operations, and access to
mechanical systems.
• Exterior finishes, particularly in the
setback area, entry lobbies, and other
ground floor spaces with public access
should be carefully selected to maximize
engagement between the building and
the abutting street, path, or public space.

The use of dark or mirrored glass is
discouraged.
• Tenant signage should be appropriately
scaled to fit the storefronts, with
tenant branding elements reasonably
accommodated. Signage should be
coordinated with the overall building and
storefront design, with regards to colors,
symbology, and typography. Interior-lit
box type signage is discouraged. (Refer to
subchapter 05.18 for Signage standards)
• Loading, service, or storage facilities
should not negatively impact the
pedestrian realm, and where feasible
should be located inside the building
or along facades other than the
primary building frontage where the
main entrance is located. Landscaping
or art may serve as an effective
screening element. Any screening
should be consistent with transparency
requirements. (Figure 05-11_01).

Ground Floor Concepts
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 102
05 I Design Guidelines and Standards

STANDARDS
• Certain activities and uses associated
with ground floor activity may encroach
upon the front setback area, including
but not limited to: outdoor seating and
dining, architectural elements such
as canopies and awnings, landscape
planters, temporary signage. These
uses may not encroach upon the clear
pedestrian path area of the abutting
sidewalk or path.
• All ground floors shall provide
unobstructed access to the abutting
sidewalk, path, or right of way. Stairs
or ramps associated with ground floor
entryways must satisfy all accessibility
requirements.

Illustrative visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 103
05 I Design Guidelines and Standards
INTENT
Roofscapes are important aesthetic aspects
for architectural and community character and
quality, and they should be addressed as part of
the overall design.

GUIDELINES
• Rooftops should be designed to support
active and passive sustainability
strategies. Buildings should provide
generous common spaces, where
possible, including habitable rooftops
and/or podium courtyards that invite use
by all residents/tenants in the building.
• Rooftop mechanical equipment should
be integrated with the massing and
appropriately screened. The equipment
should be organized and designed as
a component of the roof scape, and
not appear to be a leftover or add-on
element.
• Building tops should be articulated in
a manner that provides visual interest
and confers visibility and distinctiveness,
when viewed from outside the project
area.
• Solar panels and localized photovoltaic
systems should be strategically placed on
roofs to maximize sun exposure.

STANDARDS
• All roofs shall be designed to be
compliant with the definition of Height
(Structure) in SCCC section 18.160.080.
["H" Definitions].
• All roofs shall be designed to be
compliant with FAA height restrictions.

05.15 ROOF
Roof Design Concepts
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 104
05 I Design Guidelines and Standards

AGE INCLUSIVE SPACES AND ENHANCED WELL-BEING
Gathering spaces that are easily accessible and serve multiple age groups can be successful in fostering new relationships.

This aids in an improved physical, mental and social well-being.

All public spaces are to be compliant with the Americans with Disabilities Act (ADA).

ALLOW FOR FLEXIBLE PROGRAMMING
Strengthening connection by creating proximity to public spaces and creative placemaking with community-based
participation at its center. Re-imagine everyday spaces with flexible programming. Create spaces with the capacity to host any programmed activity.

RESPECT HISTORIC CONTEXT
Creating an open space experience that respect’s the region’s heritage and its landscape. This establishes the site’s unique identity, such as traditional regional landscapes, native bio- diversity and ecosystems.

ENGAGE WITH NATURE
Ecological spaces integrate energy efficient practices into daily experience of the community. The project’s commitment to restoring natural areas, sustainability and adaptive measures against flood hazards will inform aspects of open space design and use.

05.16 OPEN SPACE DESIGN PRINCIPLES

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 105
05 I Design Guidelines and Standards

05.17 PARKS AND OPEN SPACE

GENERAL
INTENT
Mission Point will provide a range of welcoming
outdoor spaces that complement the built
environment around the development. These
spaces can be categorized as three types:

Park, Residential Private Amenity Space, and
Non-Residential Private Open Space. Each
one accommodates different programs and
activities for residents, workers, and visitors.

GUIDELINES
• Landscaped areas should accommodate
bio-retention infrastructure. Where
feasible, these bio-retention areas
should be designed as bulbouts or curb
extensions. Bio-retention requirements
for the public park shall only serve the
parkland.

STANDARDS
• All open space areas and amenities shall
be in substantial compliance with federal,
state, and local ADA regulations.
• All landscaping shall comply with
the California Water Conservation in
Landscaping Act, Government Code
Section 65591 et seq.
• All bio-retention or stormwater
management areas shall be designed
to the standards specified in the City
of Santa Clara Green Stormwater
Infrastructure Plan.

Illustrative visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 106
05 I Design Guidelines and Standards
Public Park
INTENT
The central open space at Mission Point is the
park, which is intended to meet the criteria
for a neighborhood park*. The public park is a
city-owned public area and will include active
and passive recreation as well as informal or
structured social gatherings.

GUIDELINE
• The neighborhood park should
accommodate a diversity of recreational
uses, and a variety of activities for all ages
and abilities to align with the parks, open
space, and recreational goals and policies of
the City of Santa Clara General Plan.

STANDARD
• The park will comply with SCCC Chapter

17.35 [Park and Recreational Land].
• The park shall be designed in collaboration
with the Parks and Recreation Department,
complying with the City of Santa Clara Parks
& Recreation Department’s Park Amenity &
Design Standards, presented to the Parks
& Recreation Commission for input, and
follow the City’s Public Outreach Policy.

Non-Residential Private Open Space
INTENT
In an effort to create a diversity of public
and private outdoor attractions across the
development, Mission Point will include a myriad
of non-residential private open spaces located at
the ground floor, podium, or terrace level. Access
will be restricted, and a limited range of uses
supported.

GUIDELINE
• Non-residential private open spaces should
emphasize passive, pedestrian-oriented
design, such as street furniture, lighting, and
diverse landscaping.
• The areas should be integrated with the
building forms, and designed as comfortable
spaces for the community.

STANDARD
• All trees shall be consistent with required
utility offsets, including substation
infrastructure.

Residential Private Amenity Space
INTENT
Taking advantage of the multiple layers of
development at Mission Point, residential
private amenity space can occur at either
ground floor, podium, or terrace level, offering
residents a range of recreational and leisure
activities.

GUIDELINE
• Indoor and outdoor residential private
amenity space should accommodate
a variety of programming, and be
accessible only for all residents of the
development.

STANDARD
• Programming shall satisfy the
requirements of the City of Santa Clara
Park Ordinance, as required in SCCC
section 17.35.070 [Credit for private
open space].
*Per the City of Santa Clara Parks & Recreation Department – Park Amenity & Design Standards, a neighborhood park is a park that is 1-15 acres in size.

N
0’ 100’50’ 200’ 400’
Figure 05-17_01:

Illustrative Parks and
Open Space
OLD IRONSIDE DR.

PATRICK HENRY DR

PATRICK HENRY

SPECIFIC PLAN
SFPUC Right-of-way
TASMAN DR.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 107
05 I Design Guidelines and Standards
Gateway Plaza
Daycare
Area
Gateway Park Area
Central Green
Park Area
South Park Area
Multi-modal Trail
Office
Office
Residential
Grade Level Parkland
Up to. 7.6 ac.

Residential Private Amenity Space
Approx. 4.8 ac.

Flex Above Grade Open Space
Approx. 2.1 ac.

Grade Level Open Space
Up to. 6.6 ac.

Commercial Above Grade Private
Open Space
Approx. 4 ac.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 108
05 I Design Guidelines and Standards

05.18 SIGNAGE
Signage Concepts
INTENT
The proposed signage for Mission Point's
public spaces aspires to unify signs that
fall into different categories: Identification,
Directional, Informational, and Regulatory.

These visual cues form a cohesive wayfinding
system facilitating efficient and inclusive
movement from and to the site. As the site
evolves, additional wayfinding components and
other features projecting from and augmenting
the streetscapes around buildings will be a
fundamental part of the development’s visual
appeal and the general quality and economic
stability of the area.

GUIDELINE
• Wayfinding signage should clearly
designate public, private, and privately-
owned but publicly accessible indoor and
outdoor areas.
• Where appropriate, hours of accessibility
for indoor areas should be explicitly
stated.

STANDARD
• All signage will comply with SCCC
Chapter 18.42 [Sign Standards], except
that exemptions may be proposed as part
of a future comprehensive sign program
• Any temporary signage located in a
public right of way shall not obstruct any
pedestrian pathways, nor EV travel paths.
• Public Park name sign shall comply
with the City of Santa Clara Parks &
Recreation Department’s Park Amenity &
Design Standards.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
109
06 | INFRASTRUCTURE
Conceptual visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
110
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
111
Mission Point will require on-site and off-site
infrastructure improvements to serve the
project. Infrastructure required to support
Mission Point will be provided pursuant to the
Project’s Vesting Tentative Map and the map’s
conditions of approval will be considered and
approved concurrent with this Development
Plan. The majority of the infrastructure
improvements will be constructed within the
existing right-of-way. It is anticipated that
Democracy Way, an existing roadway within
the project site with a public street right-of-way
easement that contains public utilities, will be
demolished and vacated, with existing utilities
to be relocated.

06.1 INTRODUCTION
Figure 06-1: Existing Parcel and Easements
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
112
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
113
FEMA Designations
Based on the Federal Emergency Management
Agency’s (FEMA) Flood Insurance Rate Maps
(Map No. 06085C0063H, dated May 18, 2009),
most of the project site is within Zone X. Flood
Zone X is defined as areas of 0.2 percent annual
chance flood, areas of one percent annual
chance flood with average depths of less than
one foot or with drainage areas of less than one
square mile, and areas protected by levees from
one percent annual chance flood. Democracy
Way and a small portion of Old Ironsides Drive
are within Zone AO, as is Calabazas Creek
(located west of the project site) with the one
percent chance flood contained within the
creek channel. Flood Zone AO is defined as
special flood hazard areas subject to inundation
by the one percent annual chance flood, with
flood depths of one to three feet. Based on
reviews of the City’s storm drainage system
maps, it appears the Zone AO designation
in the street segments described is due to a
combination of the elevation of the streets
and the hydraulic grade line of the storm drain
system at these specific locations.

Easements
The project site is encumbered by several
recorded easements that include Underground
Electric Easements (U.G.E.E.) and Sidewalk
Easements, as depicted and described in the
project’s Vesting Tentative Map.

06.2 EXISTING CONDITIONS
City and County of San Francisco Parcel
(CCSF) (Doc # 675584)
The CCSF owns an 80 foot-wide parcel of land
south of the project site for water transmission
mains
Sea Level Rise
Sea level rise (SLR), as an effect of climate
change, is projected to increase coastal
flooding beyond current levels. Projections
given by the SF Bay Conservation and
Development Commission show potential SLR
of up to 2.0 feet by 2050 and up to 5.5 feet by
2100. At its current elevation, the project site
would be vulnerable to future SLR-influenced
flood events.

Storm Drain
The City of Santa Clara owns and maintains
the storm drainage system which serves
the project site. The project site currently
drains into storm drain lines in Tasman Drive,
Democracy Way, Patrick Henry Drive, and Old
Ironsides Drive. Although the project site is
closer to Calabazas Creek, the storm drainage
lines discharge into San Tomas Aquino Creek
which is located east of the project site. The
existing Tasman Drive line is a 36-inch line west
of the Patrick Henry Drive intersection and
transitions to a 42-inch line east which then
becomes a 48-inch line. The Tasman Drive line
then continues flowing east to Great America
Parkway and ultimately discharges into San Tomas
Aquino Creek. The Patrick Henry Drive line is a
24-inch line that transitions to a 36-inch line as it
flows north. The storm drain line then continues
flowing east onto Democracy Way. The Democracy
Way line transitions from a 36-inch line to a 42-
inch line east and then to a 48-inch line. The storm
drain line then continues flowing north onto Old
Ironsides Drive where the 48-inch line connects
with the 48-inch Tasman Drive line. There is a 24-
inch line in the southern portion of Old Ironsides
Drive that flows south toward the Old Glory Lane
intersection where it transitions into a 27-inch line
and runs east to Great America Parkway, ultimately
discharging into San Tomas Aquino Creek. The
creek carries the runoff into San Francisco Bay.

There is no overland release of stormwater directly
into any creek from the project site; all stormwater
enters the creek through the existing stormwater
drainage system.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
114
Stormwater Management
The State Water Resources Control Board
(SWRCB) administers the National Pollutant
Discharge Elimination System (NPDES)
General Permit for Construction Activities,
which is intended to reduce construction-
related stormwater pollution. The project site
is exempt from the NPDES hydromodification
requirements because it drains into a hardened
channel (San Tomas Aquino Creek).

Domestic Water
Water service to the site is provided by the
City of Santa Clara Water and Sewer Utility.

There is a network of 12-inch asbestos-cement
domestic water mains in all of the streets
adjacent to the project, including Democracy
Way. There are existing fire hydrants located
around the project on all adjacent streets
including Democracy Way. The City has
performed a Water Supply Assessment (WSA)
which determined the City has capacity to
service the project site. The City determined a
Development Impact Analysis was not required
for this project. Instead, a fire flow test has
been completed for the project to confirm
existing flows and pressures in the existing
water mains.

Recycled Water
Recycled water service to the site is provided
by the City of Santa Clara Water Utility. There
are 8-inch recycled water lines along the east
and west boundaries of the project site in
Old Ironsides Drive and Patrick Henry Drive.

Recycled water is currently used to irrigate the
landscaped areas on the project site and the
surrounding properties.

Sanitary Sewer
Wastewater from the City of Santa Clara is
treated at the San Jose/Santa Clara Water
Pollution Control Plant (WPCP), located near
Alviso. The WPCP is a regional wastewater
treatment facility serving eight tributary
sewage collection agencies and is administered
and operated by the City of San José’s
Department of Environmental Services. The
City operates three main sanitary sewer lines
in the streets adjacent to the project site. All
of the lines ultimately connect to the existing
12-inch main in Tasman Drive and flow to the
Tasman Lift Station located at the southwest
corner of Tasman Drive and Great America
Parkway.

Electric (Silicon Valley Power)
Electric service for the project site is provided by
Silicon Valley Power (SVP), the owner and operator
of the system. Based on review of SVP’s utility
base maps all existing parcels are encumbered
by 10-foot-wide underground electric easements
along the street frontages of Patrick Henry
Drive, Tasman Drive, Old Ironsides Drive, and
Democracy Way that are for the exclusive use of
Silicon Valley Power (SVP) for public electrical and
communication lines.

Gas (PG&E)
Gas service in the City of Santa Clara is provided
by Pacific Gas and Electric (PG&E), the owner and
operator of the system. Based on review of the
PG&E’s utility base maps, there is a network of gas
mains in Patrick Henry Drive, Tasman Drive, Old
Ironsides Drive, and Democracy Way, which are
adjacent to the project.

Figure 06-2_01: Existing Easement Conditions
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
115
Figure 06-2_02: Existing Utility Plan
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
116
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
117
In order to ready the site for development, the
following improvements are anticipated:

Grading
INTENT
The project site will be raised above existing
elevations to decrease vulnerability to future
SLR-influenced flood events. The site will be
graded as the site is developed until full build
out. At full build out, the site will be graded so
that runoff can drain overland to the adjacent
public streets should the on-site storm drain
system fail.

GUIDELINE
• Runoff will be allowed to pond at an
elevation lower than the building finished
floor before releasing to a public street so
that buildings will not flood in the event of
a storm drain system failure.
• At the property lines, adjacent grades
will be maintained so that the existing
stormwater drainage patterns will be
maintained. The adjacent grades will slope
upwards as they enter the project site to
facilitate necessary elevation changes.

STANDARD
• Finished grade elevations will be set
following verification of the proposed
project’s compliance with the City’s
floodplain ordinance requirements.
• Doors and vehicle entrances will be
set above the projected future flood
elevations.

06.3 SUMMARY OF “MAKE-READY” IMPROVEMENTS
Wet Utilities:

Storm Drain
INTENT
Provide adequate storm drainage for each
development area through full build out.

GUIDELINE
• Remove existing storm drain under
Democracy Way
• Construct new storm drains in Patrick
Henry Drive, Tasman Drive, and Old
Ironsides Drive.
• Include low impact development
measures to reduce runoff pollutant loads
such as bioretention (with underdrain),
flow-through planters, tree wells with
media filters, infiltration trenches (with
underdrain), open spaces, catch basin
filters, green roofs, rainwater harvesting
or on-site re-use and green streets.

STANDARD
• Improvements shall be implemented
pursuant to the project’s Vesting
Tentative Map and Conditions of
Approval for each development area
through full build out.
• The project shall comply with the City of
Santa Clara Stormwater C.3 requirements
and the SWRCB NPDES General Permit
for Construction Activities.

Domestic & Recycled Water
INTENT
Provide the project with an adequate domestic
water supply for each development area through
full build out.

GUIDELINE
• Remove existing domestic water 12-inch
asbestos cement pipes from Democracy Way,
Patrick Henry Drive, Old Ironsides Drive, and
Tasman Drive.
• Remove existing recycled water 8-inch
asbestos cement pipes from Democracy Way,
Patrick Henry Drive, Old Ironsides Drive, and
Tasman Drive.
• Construct new 12-inch Ductile Iron Pipe (DIP)
for domestic and recycled water mains in
Patrick Henry Drive, Old Ironsides Drive, and
Tasman Drive.
• Implement dual plumbing where applicable.
• Provide Advanced Metering Infrastructure
(AMI) functional water meters and
implement remote AMI meter reading.
• Provide fire hydrants throughout the
site and along frontages at a distance of
approximately 300’ on center.
• Where possible, utilize existing fire hydrants.
• Provide recycled water connections on
Patrick Henry Drive and Old Ironsides Drive
for irrigation of public and private open
spaces for each development area through
full build out.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 06 I Infrastructure
118

STANDARD
• Improvements shall be implemented
pursuant to the project’s Vesting
Tentative Map and Conditions of
Approval.
• Use dual plumbing for all non-residential
use and landscape irrigation as required.

Sanitary Sewer
INTENT
Provide an adequate sanitary sewer system for
each development area through full build out.

GUIDELINE
• Remove existing sanitary sewer line
under Democracy Way.
• Construct a new gravity flow sewer
system where feasible.

STANDARD
• The sewer system shall be designed in
general conformance with the analysis
in the City’s Sewer Study in the project’s
Environmental Impact Report. Minor
modifications can be made within reason
during the design phase.
• Improvements shall be constructed
pursuant to the project’s Vesting
Tentative Map and Conditions of
Approval.

Dry Utilities:

Electric (SVP), Gas (PG&E), &
Communications (AT&T and Comcast)
INTENT
Provide adequate electric, gas, and
communication utilities for each development
area until full buildout of the project site.

GUIDELINE
• Existing electrical, gas, and
communications utilities in Democracy
Way will be removed.

STANDARD
• New electrical utilities will be
constructed pursuant to an agreement
with SVP .
• Gas facilities will be relocated or removed
pursuant to a determination by PG&E.
• Communication utilities will be relocated
or removed pursuant to a determination
by AT&T and Comcast.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 07 I Sustainability
119
07 | SUSTAINABILITY
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 07 I Sustainability
120
Conceptual visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 121
07 I Sustainability

07.1 VISION
Sustainability is an integral part of ensuring
Mission Point becomes a walkable and inclusive
neighborhood that is adaptive to projected
climate change impacts over the next century.

The community’s well-being and resource
efficiency are at the project’s core.

Innovation

In addition to expected sustainability
strategies, the project will include features
that plan for the future for human and
environmental performance, such as:
• Integrated terraces and green roofs
• Dual plumbing systems to reuse water
when feasible
• LEED for Neighborhood Development
Silver or equivalent
Mixed Use
Mission Point establishes a 15-minute
neighborhood in the heart of Silicon Valley
by bringing together multiple uses such as
residential, commercial, retail, and public
amenities. This establishes a convenient
walking and biking network, reduces travel
distances, and consequently reduces the
congestion and emissions associated with
combustion-fueled vehicular traffic.

Mobility
Mission Point connects its mix of homes,
jobs, and amenities to the community, adding
density to existing and planned public transit
lines, bicycle corridors, and walking trails. This
reduces congestion and air pollution and allows
residents, workers, and players outside the
development to live a healthy, active lifestyle.

Compact
Compact mixed-use developments reduce
the physical building footprint, and optimize
land, water, and energy consumption per
capita. The compact footprint of Mission Point
incorporates key sustainability strategies that
reduce the project’s overall carbon footprint.

Open Spaces
Mission Point leverages the vertical plane on
buildings in order to maximize the footprint
available for open space. Open spaces include
plazas, parks, a green spine, a perimeter
green way, roof terraces, and a multi-use
trail. These support cutting-edge storm water
management, connections to the greater
bayside environment, and a diverse range of
open spaces available to visitors, residents, and
workers.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 122
07 I Sustainability

07.2 GOALS
Mission Point’s sustainability goals are
defined in five key environmental and well-
being categories. These goals will be achieved
through a suite of potential sustainability
strategies, described in the following
subsections. Some strategies have co-benefits
and support multiple goals.

1. Reduction in Energy and Carbon Emissions
• On-site solar PV renewable energy
generation
• All-electric buildings
• All new residential construction will be
zero net energy (ZNE)*
• All new commercial construction will be
ZNE by 2030

2. Water and Ecosystems
• Water-efficient buildings (targeted
reduction from CAL Green baseline)
• Water-efficient landscaping (targeted
reduction from CAL Green baseline)
• Maximize open space
• Municipal recycled water
*Per the California Department of General Services (GSA), a ZNE Building is an energy-efficient building where, on a source energy basis, the actual annual consumed energy is less than or equal to the on-site renewable generated energy.

3. Material Resources
• No and very-low VOC finishes
• Minimum 75% construction/demolition
debris diversion from landfill
• Recycling and compost collection
infrastructure

4. Well-being and Community
• 15-minute neighborhood
• Community green spaces – parks, plazas,
terraces, multi-use trail
• Sustainable design-based transportation
measures to help Santa Clara achieve its
VMT reduction goals

5. Preparing for the Future
• Base elevation 15’ above sea level
(NAVD88)
• On-site renewable energy generation to
reduce total energy consumption and
reliance on the grid
• Target LEED ND (Neighborhood
Development) Silver or equivalent for the
entire campus
• LEED CS (Core & Shell) Gold or
equivalent for the commercial buildings
• LEED NC (New Construction) Silver for
high-rise residential buildings (9 stories
or more)

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 123
07 I Sustainability

07.3 SITE CHARACTERISTICS

AND OPPORTUNITIES
Santa Clara Valley
California Water Science Center, USGS
Santa Clara is home to the headquarters of many
well-established tech companies. Mission Point
enjoys significant locational advantages and is close
to a variety of public transit. The site shares the SF
Bay Area’s climate change risks of long term SLR,
riverine flooding, an increase in hot days and nights,
drought, and wildfires.

The Mission Point site is envisioned as a mixed-use
development transforming the underutilized light
industrial land into a vibrant neighborhood, drawing
in both commercial and residential tenants to live,
work, shop and play in a single place.
airfieldt!
101 103
Hacienda
Bascom
101
Los Gatos
Winchester
Santa Cruz
University
Pollard
Allendale
Fruitvale
Quito
Sunnyvale-Saratoga
Sunnyvale-SaratogaDe Anza
Saratoga
Atherton
Saratoga Pollard
Campbell
Civic
Center
Orchard
City
Hamilton
Meridian
Moorpark
Forest Naglee
W Taylor
Coleman
Coleman
De La Cruz
FruitdaleRenova
Parkmoor
Prospect
Bollinger
Vallco101
Miller Miller
De Anza
Wolfe
Tantau
Lawrence Expwy Lawrence Expwy
McClellan
Williams
Burrows
Knowles
Samaritan
Los Gatos-Almaden
102
Winchester Winchester
Kiely
Bascom Bascom
Cypress
101
101
101
Union
Saddle Rack
San Carlos
Ginger
Stevens Creek
Stevens Creek
Foothill
Stevens Creek
Curtner
S a r a tog a
Washington
El Camino Real
Bernardo
Sylvan MV
Manhattan
Clarke
Pulgas
Donohoe
Willow
Euclid
280
280
397
281
296
O’Connor
Page Mill
StanfordBowdoin
Campus
Junipero Serra
Foothill Expwy
Serra Mall
Page Mill
104
101 102 103 104
Hanover
Hillview
Porter
MirandaDeer Creek
101
102
103
104
Hillview
Arastradero
Showers
Charleston
288
Meadow
Meadow
Alma
104
Waverley
Waverley
Sand Hill 280
281
QuarryArboretum
Welch Palm
U
U
Galvez
Palo
University
280 296 397
281
280
Homer
Channing
Loma Verde
Middlefield
LouisOregon Expwy
288
288L
288
288M
Middlefield
DB
397
296
ECR
288L 288M
288L
104
DB1
Rengstorff Ortega
Escuela
Castro
Hope
Grant
San Antonio
Shoreline
GO
GO
GO
Moffett
Villa
Latham
MV
MV
MV
MV
California
Middlefield
Central Expwy
104
El Camino Real
Logue
Clyde Mathilda
Mathilda
GO
GO
Whisman
Maude
Almanor
Ross
Innovation
Middlefield
MV
Evelyn
Fairchild
McCandless
Main
Lundy
Capitol
Great Mall
Pkwy
Murphy
Ranch
Technology
Holger
Trade
Zone
Mission
College
Narvaez
Capitol
Expwy
Hillsdale
Foxworthy
Montague
Landess
Montague Expwy
Calaveras
Jacklin
Washington
Dixon
Dixon
Landing
Arizona
246247
Jacklin
Park Victoria
Milpitas
Main
104
104
Abel
Ranch
McCarthy
Zanker Weller
Warm Springs
Temple
Sequoia
Yosemite
247
270
246
246 247
217
217 239
217
Milmont
Page
Kato
239
239
Old Ironsides
Great
America
Bunker
Hill
Old MV-
Alviso
Patrick Henry
Lawrence
Great America Wy
Great America Pkwy
Gold
Alum Rock
Story
McKeeMabury 270
270
270
Berryessa
Sierra
Hostetter
Morrill
Morrill
Piedmont
E Julian
E TaylorE Hedding
E San Antonio
Rigoletto
E San Carlos
17th
24th
McLaughlin
McLaughlin
Senter
King
King
Silver Creek
King
Lundy
Flickinger
Adrian
Jackson
Jackson
Senter
Monterey
Monterey
Keyes
Story
Tully
Capitol
Expwy
Yerba Buena
Tully
Ocala
Curtner
Cottage
Grove
Alma
Curtner
Dry Creek
Cottle
Newport Lincoln
Hillsdale
Blossom Hill
Meridian
Camden
101
Minnesota
Willow
Coe Lelong
256
256
256
11th
N 11th 13th 14th
N 1st
N 10th
10th
S 1st
Quimby
Quimby Gurdwara
Ruby
Delta
San Felipe
Aborn
Aborn
The Villages
CapitolExpwy
Berryessa
Oakland
O
a k la n d
Montague
ExpwyMontague Expwy
Plumeria
Seely Cottonwood
McCarthy
N 1st
N 1st
Agnew
Murphy
Brokaw
Capitol
Francis
White
Patt
880
880
880
880
1 0 1
1 0 1
1 0 1
1 0 1
680
680
680
Escuela
Marylinn
Serra
White
White
Capitol Expwy
103
Sylvandale
Senter
S e v e n Trees
Skyway
SnellSnell
102
102 102
Blossom Hill
Blossom Hill
Winfield
Coleman
Chynoweth
Santa Teresa
Monterey
Hellyer
Blossom Hill
Ford
Flintwell
Silver Creek Valley
Cottle
Poughkeepsie
Santa Teresa San Ignacio
Via del Oro
Camino Verde
Roeder
Branham
85 McAbee
Meridian
Camden
Camden
Almaden
McKean
Harry
Almaden Expwy
Trinidad Crown
Via Valiente
Almaden Expwy
Leigh
Bird
Race
W H e d d i n g
W Santa Clara
The Alameda
El Camino Real
Airport
Skyport
87 Benton
Homestead
Market
Homestead
Monroe
Monroe
Bellomy
Lafayette
Washington
San Tomas
Scott
Central Expwy
Arques
Kifer
De Guigne
Walsh
Monroe
BowersBowers
Scott
Scott
Reed
El Camino Real
Fair Oaks
Sunnyvale
Maude
California
Evelyn
Frances
Fair Oaks Wolfe
Stewart
Duane
Lakehaven
Meadowlake
Fair Oaks
Silverlake
Lakebird
Tasman
Santa Trinita
S unnyv a le
Stelling
Saich
Bandley
Stelling
N 1st
N 1st
Vista
Montana
Caribbean
1st
Java
C St
Crossman
237
237
237
1 0 1
1 0 1
1 0 1
1 0 1
85 Rengstorff
Old
Middlefield
Fabian
288
ShorelineGO
GO
104
Stierlin
Pear
Crittenden
Garcia
Marine
GO
GO
San Antonio
Casey
Bayshore
Clark
Dana
Cuesta
Grant
Grant
Truman
Bernardo
Hollenbeck
Mary
Miramonte
MV
E l M o n t e
El Monte
San Antonio
Fremont Fremont
Bryant
Remington
Homestead
California
Olmsted
A r a s t r a d e r o
El Camino Real
Hansen
101 102 103
288 288L 288M
Embarcadero
U
U
W Bayshore
Woodland
E Bayshore
DB1 DB1
280
280
DB1
Serra
DB
R i v e r O a k s Sycamore Buckeye
Alder
C a m d e n
Main
17 17
17 DB1
U
102
103
103
103
280
280
85 85
85 280
87 85
85 T a s m a n
O l d S a n F r a n c i s c o
Almaden Expwy
to Morgan Hill,
Gilroy
68 to Morgan Hill, Gilroy
(see South County map)
HWY17
to San Jose
Y e r b a B u e n a
H a m i l t o n
Pine
San Tom
as E x p w y
E l C a m i n o R e a l
101 102 103
102
102
103
103
103
104
104
Colorado
W Julian
Lafayet t e
Thornton
Silicon ValleyBernal
102
C a p it o l A v e
C h a r l e s t o n
Gold St Connector
101 102 103
104
Charle s t o n
568
to Morgan Hill, Gilroy
(see South County map)
57 57
57 60 61
61 61
61 60
60 60
61 61
66 66
66 66
66 77
70 72
70 73
25 26
25 25
25 25
25 66
68 72
70 70
70 73
66 68
72 73
22 77
22 26
77 60
60 57
57 522
64 A 64 B
64 A
64 B
64 A
64 B
522
522
66 66
66 68
68 68
68 2323
522
22 522
22 522
22 522
22 23
500
61 77
72 70
522
22 500
66 522 23
22 20
20 59
59 59
59 59
59 59
20 20
20 20
21 21
21 21
21 21
21 21
21 21
40 40
40 40
40 40
21 21
55 55
55 55
55 55
55 55
53 59
53 53
53 53
53 56
56 56
44 44
44 47
47 47
71 71
71 71
71 39
39 31
42 39
31 31
42 42
42 27
27 27
83 27
27 27
27 27 37
37 37
37 37
37 26
25 25
25 51
51 51
51 51
51 51
51 51
52 52
40 52
52 42
42 42
47 56
56 56
56 56
56 70
70 70
77 60
83 83
61 61
89 89
89 89
60 59
59 5551
26 26
26 26
523523
523
523
523
523
568
568
Alum Rock
Bonaventura
Orchard
River Oaks
Tasman Cropley
Milpitas
Transit Center
Hostetter
Berryessa
Penitencia
Creek
Berryessa
Transit Center
McKee
Hamilton
Bascom
Fruitdale
Race
Virginia
Tamien
Curtner
Capitol
Branham
Ohlone/
Chynoweth
Blossom Hill
Snell
Cottle
Blossom Hill
Caltrain
Capitol
Caltrain
Santa Teresa
Downtown
Campbell
Whisman
Sunnyvale
Reamwood Great America
Baypointe Cisco Way Alder Great Mall
Old IronsidesViennaFair Oaks
Crossman
Borregas
Lockheed
Martin
Moffett
ParkBayshore/
NASA
Middlefield
Lick Mill
Component
Karina
Japantown/
Ayer
College
Park
Caltrain
Lawrence
Caltrain
San Antonio
Caltrain
California Ave
Caltrain
Stanford
Caltrain
Mountain View
Palo Alto
Gish
Civic Center
Metro/Airport
Great
America
Champion
Eastridge
Transit Center
West Valley
College
Transit Center
Winchester
Santa Clara
Transit Center
San Jose Diridon
E Santa Clara
61 Southwest Expwy
Great
Mall
Kaiser
Milpitas
Milpitas
City Hall
McCarthy Ranch
Shopping Center
Eastridge
Center
Raging
Waters
Kaiser
San Jose
VA
Clinic
Westfield
Oakridge
Camden &
Hwy 85
Silicon Valley
Technical
Education
Good Samaritan
Hospital
PayPal
Park
Mineta
San Jose
International
Airport
Moffett
Field
Santa Clara
University
Westfield
Valley Fair
Triton
Museum
Santa Clara
City Hall
Santana
Row
O’Connor
Hospital
Rose
Garden
Rosicrucian
Museum
SCVMC
Shuttle
Winchester
Mystery House
Westgate
El Paseo
de Saratoga
El Camino
Hospital
West Valley
College
Kaiser
Santa Clara
Valley
Health
Center
Sunnyvale
City Hall
County
Courts &
Offices
Convention
Center Levi’s
Stadium
California’s
Great America
VTA
Administration
San Antonio
Shopping
Center
Shoreline
Amphitheatre
Computer
History Museum
Palo Alto
Tech Center
Stanford
Research Park
Stanford
Shopping
Center
Stanford
Stadium
Palo Alto
City Hall
Stanford University
Pruneyard
Campbell
City Hall
San Jose
State
University
Grand
Century
Mall
Santa Clara
County Fairgrounds
Municipal
Stadium
Happy Hollow
Park & Zoo
History
San Jose
El Camino
Hospital
Los Altos
City Hall
Los Altos Hills
City Hall
Kaiser
Mountain View
Mountain View
City Hall
Ames
Research
Center
America
Center
Alviso
Marina
Flea
Market
Regional
Medical
Center
Mexican
Heritage
Plaza
North
County
Courts
& Offices
Evergreen Valley
College
Kelley
Park
Main
Post
Office
Lake
Cunningham
Park
Emma
Prusch
Park
Santa Clara
Central Park
Shoreline Park
Baylands
Park
Santa Teresa
Park
San Francisco Bay
VA Hospital
Mission
College
Santa Clara Valley
Medical Center
San Jose
City College
Foothill
College
De Anza
College
Cupertino
City Hall
Monte Sereno
City Hall
Los Gatos
Town Hall
Saratoga
City Hall
Intel
Museum
SamTrans
to San Mateo
County
ECR 280 281
296 397
Dumbarton Express
to Union City BART
DB DB1
MV Community Shuttle & MVgo
Local service in Mountain View
and commute-hour shuttles from
Mountain View Caltrain station
MV GO
AC Transit
to Fremont BART
U
AC Transit
to Fremont BART
217 239
ACE Shuttle
Weekday commute-hour shuttles
between Great America rail station
and major employment sites
Amtrak
Highway 17 Express
to Santa Cruz
HWY17
Stanford Marguerite
Shuttle
Various routes on
and around campus
1050A
AE-F
C
EB
HD
MC
N
O
OCA
P
RP
S
SE
SLAC
X
Y
Saratoga
Campbell
Cupertino
Palo Alto
Mountain
View Milpitas
Santa
Clara
Los
Altos
Los
Altos
Hills
Los
Gatos
Monte
Sereno
Fremont
San Jose
San Jose
San Jose
Sunnyvale
Menlo
Park
East
Palo Alto
Downtown
San Jose

SEE INSET
Legend
VTA Transit Services
Light Rail

BLUE LINE
Santa Teresa – Baypointe
Partners & Neighbors
Bus
Rapid Bus
Limited-stop service at frequent
intervals
Municipal bus and shuttle services
within Santa Clara County:

A thick line indicates frequent service
A dashed line indicates part-time service
BART
Caltrain · ACE · Amtrak
Regional rail connecting
the Bay Area
Frequent Bus
Less frequent part of route
Local Bus
Less frequent or selected
trips only
Express Bus
Direct commute-hour service
School Service
Seasonal service oriented to
school bell times (open to public)

GREEN LINE
Winchester – Old Ironsides
Mountain View
Community Shuttle
MVgo Shuttle
ACE Shuttle
Stanford Marguerite
Connecting transit bus services to
neighboring cities and counties:

SamTrans
Dumbarton Express
Amtrak Highway 17 Express
AC Transit

ORANGE LINE
Mountain View –Alum Rock
Light Rail Station
Transfer Station
Rapid
Stop
BART Station
Longer-distance rail to
neighboring counties/regions
Rail Station
Park & Ride
Lot
Transit Center
61 522
61 Rapid Bus
Limited-stop service
Rapid
Stop
89 42
Places & Connections102
247 High
School
Hospital,
Medical Center
schematic map
not to scale
FEBRUARY 14, 2022
Subject to Change
523
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 124
07 I Sustainability
Existing Site Ecosystem
Mission Point is located in the San Francisco
Bay watershed characterized by a rich
ecosystem. Currently, the site is almost entirely
covered with hardscape. The proposed design
will replace these impervious surfaces with
vegetation and permeable materials, creating
an opportunity to filter stormwater runoff
and retain precipitation, thereby enhancing
the water quality of nearby waterways and
restoring soil health. The project also aims to
re-introduce some biodiversity by incorporating
native plantings and providing food for native
pollinator species. This will improve soil and
waterway health, human health, and local
microclimate.

Local Climate
Santa Clara’s geographic location places it in a
Mediterranean climate with warm summer days
and cool nights, and mild winter days. However,
climate change is accelerating the frequency
and severity of extreme weather events,
according to projections. This will worsen air
pollution and sea level rise. Thus, it is critical
to integrate passive heating and cooling
strategies, as well as resilient design strategies
to take advantage of the local climate and
mitigate both local extremes and long-term
climate change.

Precipitation
By targeting a combined potable water
use reduction beyond code, Mission Point
hopes to ease the pressure of contemporary
water demand. Water-efficient fixtures and
landscaping, on-site water reuse of harvested
rainwater, and the use of municipal recycled
water for non-potable needs are all ways to
reduce water consumption. This three-step
strategy maximizes the on-site precipitation,
while minimizing the need for treated water
from off-site sources.

Transit
Many existing and planned transit lines and
trail connections serve Mission Point (Figure
07-3_02). The site is located near key Caltrain,
BART, and Rail Stations (ACE & CC). These
transit routes connect Mission Point to the
surrounding community, while conserving
energy, reducing emissions, and lessening
congestion. Alternative transportation is
further promoted through implementation or
creation of bikeshare programs, bike paths, bus
stops, and shuttles.

The project will implement a TDM Plan, and
will comply with (or exceed) the City’s Climate
Action Plan (CAP) goal for VMT reduction.

Figure 07-3_01: Annual Average Maximum Temperature,
Cal-Adapt Local Climate Change Snapshot
Figure 07-3_02:

Main Map, Valley Transportation Systems
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 125
07 I Sustainability

07.4 ENERGY AND CARBON

EMISSIONS
The Hub - Hardy Warehouse Repositioning / Tempe, AZ, US / Gensler Goals
• On-site solar PV renewable energy
generation and batteries
• Electric site
• All buildings net zero starting in 2030
Mission Point will consider the strategies
on the following page to accomplish these
project goals.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 126
07 I Sustainability
High-efficiency Systems
Passive measures help maintain indoor thermal
comfort using the inherent physical and
thermal properties of the building envelope
and its surroundings.

Once passive design strategies have been
employed to the greatest extent feasible, high-
efficiency systems will be used, such as:
• High efficiency HVAC systems
• LED lamps in light fixtures
• Daylight and occupancy sensors
• Building Management Systems/smart
building controls to control the buildings’
heating, ventilation, air conditioning and
lighting through a single interface
• Displacement ventilation for providing
conditioned air to enclosed spaces
with the aim to improve air quality and
thermal comfort, while reducing the
amount of energy to operate the system
• Radiant cooling systems, which use
cooled surfaces such as floors or ceilings
to absorb heat from a room, in order to
help cut energy use and lower and shift
peak electricity demand in buildings
compared to conventional all-air systems
On-site PV Renewable Energy Generation
Paired with Battery Storage
Although building energy loads will be reduced
as is practical through passive and active
energy efficiency measures, there will still be
energy demands for the project. Additional
strategies for energy reduction may include:
• On-site solar photo-voltaic renewable
energy generation, using rooftop solar
panels and additional strategies where
viable.
• Battery to maximize the use of the solar
generated energy on-site, and to ensure
that the additional generation provides a
net benefit to the local grid.

Passive Strategies
Passive strategies reduce heat gain, building
energy, and water consumption through
architectural and landscape design. These
strategies can include:
• Open spaces, including terraces and
balconies, oriented for shelter from
summer sun and strong winds, and to
provide programmable, desirable indoor-
outdoor space
• Green roofs for insulation and to
provide additional accessible ‘naturally
conditioned’ usable space
• Exterior shading designed into the
facades and/or provided by landscape
planting to reduce heat gain
• Buildings oriented to block detrimental
sunlight and wind and create comfortable
outdoor spaces
• Glazing located to optimize natural light,
control glare, and reduce detrimental
heat gain
• Heat island mitigation through cool
roofs, light-colored pavement, and shade
trees
• Building envelopes with superior
insulation and weather sealant
• Operable windows where practical
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 127
07 I Sustainability

07.5 WATER AND ECOSYSTEMS
Goals
Water Use Reduction
• Water-efficient buildings: Set reduction
(i.e. 5% minimum) from California Green
Building Code baseline
• Water-efficient landscaping
Ecosystems
• Public Park and private open spaces:

Consist of approximately 25.1 acres
of the total 48.6 acres that occupy the
Mission Point site. This accounts for
approximately 50% of the total area,
assuming the open spaces are distributed
along ground floor, podium, terraces,
balconies, and other landscaped or
hardscaped areas of the project.

Mission Point will consider the strategies
on the following page to accomplish these
project goals.

Workday Headquarters / Pleasanton, CA, US / Gensler
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 128
07 I Sustainability
Water-efficient Buildings
• Low-flow plumbing fixtures with flow
rates below California Green Building
Code allowed maximums wherever
practical
• Accessible water data to inform
occupants of water use and encourage
reduced water consumption
Water-efficient Landscape
• Native drought tolerant plants to reduce
water consumption
• Tree canopy at parks, plazas, and
multi-use trail wherever possible, to
reduce heat gain (and therefore water
requirements) for under-canopy plants
• Flow-through planters
Ample Open Space
• Parks, plazas, pedestrian paths, and a
multi-use trail
• Accessible green roofs
• Building terraces
• Significant reduction of impermeable
surfaces from current state
Ecosystem Support
• Native plants to support native
pollinators and birds
• Light pollution reduction
• Bird-safe building design and
construction
• Tree canopy
On-Site Rainwater Capture and Reuse
• Building and landscape rainwater capture
and reuse
• Green-blue infrastructure strategies
(‘Slow it, sink it, save it’)
• Possible treatment and reuse for fixture
flushing
Municipal Greywater
Municipal greywater (recycled water) is a
companion to on-site captured rainwater.
• Used for fixture flushing for commercial
buildings
• Used for landscape irrigation
Municipal greywater systems may require
monitoring to ensure that required quality for
project uses is maintained.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 129
07 I Sustainability

07.6 MATERIAL RESOURCES
Goals
• Low-emitting finishes throughout
• 75% construction/demolition debris
diversion from landfill
• Recycling and compost collection
infrastructure
Mission Point will consider the strategies
on the following page to accomplish these
project goals.

UpCycle / Austin, TX, US / Gensler
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 130
07 I Sustainability
No and Very-low Emissions Finishes
• Where feasible, finishes (interior and
exterior) will have no or very-low volatile
organic content to maximize indoor air
quality
• Interior finishes will also meet VOC
emissions certification requirements for
LEED, or equivalent
75% Construction and Demolition Debris
Diversion From Landfill
• Reuse of excavation material wherever
feasible
• Source separation of construction debris
on site to maximize recycling
• Encourage verified debris diversion
through audit or third-party certified
facilities
Recycled Content
• Use LEED v4.1 (or equivalent) materials
tracker for all building products to
target minimum 15% recycled content
by material cost for all new building
construction
Recycling and Compost Collection
Infrastructure
• Design recycling and compost collection
infrastructure throughout the site and all
buildings
• Use informational graphics to encourage
composting over recycling and landfill
Reuse of Salvageable Demolition Materials
• Catalog materials to be demolished and
coordinate with local reuse organizations
to maximize repurposing
• Track embodied carbon reduction of
reused materials
Carbon Smart Building Materials
• Target average embodied carbon
reduction from baseline for all concrete
and steel used at Mission Point
• Prioritize use of high recycled content
materials (concrete, steel, aluminum,
recycled composite woods) and carbon-
sequestering materials such as wood,
composite wood and laminated timber
• Leverage available re-purposed building
materials from the area for new
construction, where possible
• Track embodied carbon for a minimum of
the five highest impact materials for all
buildings to verify reductions
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 131
07 I Sustainability

07.7 WELL-BEING AND

COMMUNITY
Goals
• 15 minute neighborhood
• Community open spaces
• Human-powered transportation
• Leisure and recreation opportunities
• Biophilic design elements and/or
practices
• Ample access to local fitness and
community wellness facilities
• Extensive use of glass to bring light and
sense of connection to nature
Mission Point will consider the strategies
on the following page to accomplish these
project goals.

/ Austin, TX, US / Austin Foundation for Architecture + Gensler MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 132
07 I Sustainability
Mixed Use, Walkable Neighborhood
• Mission Point’s mix of uses on a

48.6-acre footprint with ample open
space and pedestrian pathways provide
the opportunity to walk or bike across the
entire development within 15 minutes
• A 15-minute neighborhood helps make
car ownership optional.
• Buildings are physically and functionally
integrated, creating a market of mutually
complementary and supportive services
and activities
Accessible and Inclusive
• Aim to exceed the accessibility provisions
of the Title 24 California Building Code
• Use the universal principles of Inclusive
Design to guide details of site and
building design
On-Site Amenities
• Space to attract a grocery tenant
• Childcare
• EV charging stations
• Bicycle parking
• Transit management support
• Space for a pharmacy
• Opportunity to include medical clinics
• Opportunity for gyms/health clubs
• Family entertainment space
• Public plaza space for gathering and
outdoor dining
Post-COVID User Experience-Led Design
• Community survey and interviews to
provide insights on community needs
• Educational outreach program/ guided
tour to focus on sustainable living
• Enable site use by including accessibility,
safety (clear, defined spaces and access
control, natural surveillance at entrances
and walkways, etc.)
Community Green Spaces
• Community green and open spaces
promote walking and human-powered
transportation for healthy exercise
• Green spaces absorb carbon dioxide and
produce oxygen, filter the air, and provide
biophilic benefits
• Open spaces provide flexible
opportunities for many community
activities from walking together to
picnicking and festivals
• Refer to ‘Water and Ecosystems’ Open
Space section for additional benefits of
this strategy
Massing for Microclimate
• The layout of mid and high-rise building
clusters is designed to create ‘courtyards’
for shelter from sun and wind
• Terraces and balconies create transitional,
programmable spaces
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 133
07 I Sustainability

07.8 PREPARING FOR THE FUTURE
Arizona Center Refresh / Phoenix, AZ, US / Gensler
Goals
• LEED-validated (or equivalent)
sustainable design
• Base elevation 15’ above current sea level
• Reduced energy consumption for
resilience
Mission Point will consider the strategies
on the following page to accomplish these
project goals.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 134
07 I Sustainability
Validated Sustainable Design
Procuring third-party LEED or equivalent
certification for the project’s sustainability
design shows occupants and the community
that the Mission Point commitment to
sustainability goes beyond words.

The project targets certification at both the
neighborhood and building levels as follows:
• LEED ND Silver or equivalent for the
entire campus
• LEED CS Gold or equivalent for the
commercial buildings
• LEED NC Silver or equivalent for high-rise
residential buildings (9 stories or more)
Green Roofs and Terraces
• Provide fresh air and cooling in grid
failure events
• Extend programmable space from indoors
to outdoors
• Control storm water runoff and retention
• Insulate the building and reduce
temperatures on the roof from fossil fuel
combustion associated with the use of
HVAC equipment
• Boost the efficiency of rooftop
mechanical equipment
• Provide an aesthetically pleasing view for
meetings or recreation
Operable Windows Where Practical
• Reduce energy required for heating,
cooling, and ventilation
• Provide passive survivability in grid
failure events
• Increase occupant satisfaction by
providing personal control
Reduced Energy Consumption for Resilience
• Passive strategies and high efficiency
systems for building design will reduce
building-hosted energy consumption
• On-site solar PV renewable energy
generation will further reduce reliance on
the grid
• On-site battery backup to provide a
percentage of the site’s total energy
demands in grid failure events
Base Elevation 15’ Above Current Sea Level
• The ground floor level is set at a
minimum of 15’ above current median
sea level (NAVD88) to provide protection
through the estimated Intergovernmental
Panel on Climate Change RCP8.5 ‘likely’
scenario of 10’ of SLR by 2100
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 08 I Review Process
135
08 | REVIEW PROCESS
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 136
08 I Review Process

08.1 Project Approvals
Mission Point’s Planned Development zoning
constitutes the policy document governing
land use in the Mission Point area. In addition
to approval of Mission Point’s Planned
Development zoning, development of the site
includes the following approvals:

General Plan Amendment
Approval of the Mission Point Project includes
the approval of a General Plan Amendment
designating the Project Site as Urban Center
Mixed Use and Urban Center Mission Point.

The Urban These uses are designed to be
consistent with new mixed-use development in
North Santa Clara and the City’s General Plan
designations, while facilitating the vision of
Mission Point as described in Chapter 01.

Urban Center Mixed Use General Plan
Designation
The Urban Center Mixed Use designation is
intended for pedestrian-oriented, high-intensity
and very high-density mixed-use development
in a transit-rich area. It permits high-rise
commercial office and residential development
(in either mixed-use or stand-alone buildings),
subject to Federal Aviation Administration
height restrictions; ground-level retail; and
landscaped areas for employee and resident
activities. Permitted uses include multi-family
residential and co-living, office and R&D uses,
light manufacturing, and retail and services that
serve local employees, residents, and visitors.

Parking is typically structured or below grade. The
residential density range is 60 - 250 dwelling units
per acre.

Townhomes are only permitted as follows:
• Townhomes designed and integrated as a part
of a multi-family building in which additional
multifamily units are included above the
townhome units (entire building must achieve a
minimum 60 du/ac); or,
• Townhomes integrated as part of a multifamily
building without additional multifamily units
above, not to exceed 25% of the buildable land
area for area C or D (in Area C, if residential is
constructed, and in Area D, entire building must
achieve a minimum of 60 du/ac).

The following are prohibited: (1) Standalone
townhomes without additional multifamily units, (2)
single family detached units, and (3) duplexes.

Urban Center Mission Point
The Urban Center Mission Point designation is
intended for pedestrian-oriented, high-intensity and
very high-density nonresidential development in a
transit-rich area. It permits high-rise commercial
office development, subject to Federal Aviation
Administration height restrictions; ground-level retail; and landscaped areas for employee and resident
activities. Permitted uses include office and R&D uses, light manufacturing, and retail and services that
serve local employees, residents, and visitors. Parking is typically structured or below grade. The minimum
FAR is 1.5.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 137
08 I Review Process
Vesting Tentative Subdivision Map
The Project’s Vesting Tentative Subdivision
Map (VTM) has been designed to facilitate
development in any logical order within the
Planned Development zoning area. Mission
Point’s VTM and attendant conditions of
approval implement Mission Point’s vision.

Affordable Housing Plan
The Project’s affordable housing plan is
provided in Section 2.11.

Transportation Demand Management Plan
The Project’s Transportation Demand
Management Plan is provided in Section 2.10.

Environmental Impact Report
A project-specific Environmental Impact Report
(EIR) has been prepared for the Mission Point
Planned Development zoning. Environmental
review of applications for development within
the Mission Point area are anticipated to tier
off of the EIR.

Development Agreement
A Development Agreement (DA) has been
entered into between the City and the property
owner that provides for certain vesting of the
Project Approvals and commits the developer
to providing certain community benefits.

During the term of the DA, in the event of a
direct conflict between the PD zoning and the
DA, the DA will control. After the term of the
DA expires, all references to the DA herein
are for informational purposes only. This
Planned Development Zoning shall survive the
termination of the DA, but after the DA expires,
the City retains its authority to amend its land
use regulations, including but not limited to
this Planned Development Zoning, subject to
applicable land use regulations and procedures.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 138
08 I Review Process

08.2 Project Implementation
Architectural Review
This Planned Development zoning envisions
the guidelines applicable to future
development within Mission Point and is
flexible to enable the Project to be built out
in response to market conditions. Individual
buildings will be reviewed pursuant to the
City’s Architectural Review process set forth
in Chapter 18.120 of the City’s Zoning Code.

This Planned Development zoning will be
considered part of the “Zoning Code” for the
purposes of the findings required by SCCC
section 18.120.020(F)(1)-(5).

Unless otherwise provided in the Development
Agreement, Architectural Review approvals
are valid for two years, subject to extensions
allowed by the City’s Zoning Code.

Application Processing Procedures
Application processing within Mission Point
will be subject to Article 6 [Permit Processing
Procedures] of the SCCC.

Permit Processing Procedures
Processing of the following permits within
Mission Point are subject to the applicable
Chapter of the Santa Clara Zoning Code:

Permit Implementation
Implementation of permits for the development
of the Project are subject to Chapter 18.128 of the
Santa Clara Zoning Code, subject to the exceptions
provided below.

PERMIT APPLICABLE CHAPTER EXCEPTION
Conditional Use Permit Chapter 18.114
Temporary Use Permits Chapter 18.122
Variances and Minor
Modifications Chapter 18.124
Zoning Clearances Chapter 18.126

SECTION HEADING EXCEPTION

18.128.060(A)(2) Allowable Phasing
Projects within Mission Point are exempt
from this provision as long as they are
consistent with the PD Zoning and VTM.

Integration with City Zoning Code
The City’s Zoning Code applies to this Planned
Development zone to the extent not expressly
inconsistent with the express terms and standards
in this PD Zoning.

MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application 139
08 I Review Process

08.3 Project Financing
It is anticipated that the Project will be
privately financed; however, depending on
how and when the Mission Point Project is
implemented, elements of the Project and
public improvements may be financed through
any other appropriate and available financing
mechanisms (e.g. Mello Roos Community
Facilities Districts, etc.).

Conceptual visualization of the proposed development
MISSION POINT BY KYLLI I City of Santa Clara PD Rezoning Application