Resolution/Mission Point Project - Vesting Tentative Subdivision Map, Option B Page 1 of 6 Rev: 7/27/2023
RESOLUTION NO. 24-9399
A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA,
APPROVING A VESTING TENTATIVE SUBDIVISION MAP,
OPTION B (PLN22-00635) AT 4995 PATRICK HENRY DRIVE AND
3005 DEMOCRACY WAY, SANTA CLARA
PLN22-00635 (Vesting Tentative Subdivision Map)
WHEREAS, on October 17, 2017, Kylli, Inc., through its wholly-owned subsidiary Innovation Commons Owner, LLC (“Owner”) made an application for a General Plan Amendment (“GPA”) in connection with the redevelopment of a 48.6-acre site generally bounded by Tasman Drive, Patrick Henry Drive, Old Ironsides Drive, and the SFPUC Hetch Hetchy Right of Way (APNs: 104-04-150, 104-04-142, 104-04-143, 104-04-151, 104-04-112, 104-04-113, 104-04-065, 104-04-111, 104-04- 064), which is currently developed with four light industrial buildings and a parking lot (“Project Site”);
WHEREAS, the Owner subsequently applied for a Planned Development (“PD”) Rezoning to redevelop the 48.6 acre site with up to 4,913,000 gross square feet of new development, including up to 1,800 units (approximately 1.8 million square feet of residential uses), up to 3 million square feet of office/research-and-development (“R&D”), approximately 100,000 square feet of retail, and approximately 10,000 square feet of childcare facilities; a Vesting Tentative Subdivision Map to subdivide the property into five lots with up to three parcels for future parkland dedication and potential residential and commercial condominium purposes and to vacate Democracy Way; and a Development Agreement (collectively, along with the GPA, the “Project”); WHEREAS, the Vesting Tentative Subdivision Map application (PLN22-00635) would subdivide the property into five lots with up to three parcels for future parkland dedication and condominium purposes, and would vacate Democracy Way to serve the development; WHEREAS, the proposed subdivision is consistent with the proposed site plan and improvements on the Project Site for the development of an up to 4,913,000 square-foot mixed-use development; //
//
Resolution/Mission Point Project - Vesting Tentative Subdivision Map, Option B Page 2 of 6 Rev: 7/27/2023
WHEREAS, pursuant to Section 17.05.210 of the Code of the City of Santa Clara (“SCCC”), a Vesting Tentative Subdivision Map shall be required for all divisions of land into five or more parcels;
WHEREAS, on January 16, 2024, the Subdivision Clearance Committee determined that the application was complete and that the proposed Vesting Tentative Subdivision Map should proceed to the Planning Commission in conformance with Section 17.05.300 of the SCCC; WHEREAS, SCCC Section 17.05.300(g) requires that the Planning Commission make recommendations of denial, approval or conditional approval to the City Council on the Vesting Tentative Subdivision Map;
WHEREAS, on November 6, 2024 the Planning Commission conducted a duly noticed public hearing to consider the proposed Vesting Tentative Subdivision Map, at the conclusion of which, the Planning Commission voted to recommend approval to the City Council; WHEREAS, the proposal is to create five new lots with up to three parcels for future parkland dedication and condominium purposes to serve the proposed development as shown on the Vesting Tentative Subdivision Map for the Project, attached hereto and incorporated herein by this reference;
WHEREAS, pursuant to the California Environmental Quality Act (“CEQA”), and the regulations implementing CEQA, specifically 14 Cal. Code of Regs § 15081, this Project was determined after an Initial Study to identify potentially significant effects on the environment, resulting in the preparation of an Environmental Impact Report (“EIR”) and Mitigation Monitoring and Reporting Program (“MMRP”);
WHEREAS, in conformance with CEQA, the Environmental Impact Report (“EIR”) prepared for the Project was noticed and circulated for a 45-day public review period from November 17, 2023 to January 2, 2024;
//
//
Resolution/Mission Point Project - Vesting Tentative Subdivision Map, Option B Page 3 of 6 Rev: 7/27/2023
WHEREAS, in addition to the Project, the EIR studied the Reduced Office/Increased Housing Alternative, which assumed the development of 800 multi-family housing units in Area C (for a total of up to 2,600 housing units for the entire Project) instead of approximately 789,000 gsf of office/R&D space, but otherwise maintained all other land use and developments assumptions of the Project;
WHEREAS, the City prepared a Final Environmental Impact Report (“FEIR”), including Attachment 3 to the FEIR analyzing the Office/R&D – Residential Flex option for the Planned Development zoning, which would permit development of up to 800 additional residential units in Area C (for a total of 2,600 units for the Project), or a mix of residential and office/R&D uses in Area C, with a corresponding reduction in square footage of office/R&D uses and a proportional increase in deedrestricted affordable residential units in Area C (“Revised Project”), as shown in Exhibit “PD Development Plans: Revised Project” to Resolution No. 24-9398; WHEREAS, the Vesting Tentative Subdivision Map proposal for the Revised Project, “Option B” is also to create five new lots with up to three parcels for future parkland dedication and condominium purposes to serve the proposed development as shown on the Vesting Tentative Subdivision Map for the Revised Project;
WHEREAS, notice of the November 19, 2024 public hearing on the proposed Vesting Tentative Subdivision Map was published in the Santa Clara Weekly, a newspaper of general circulation for the City, on November 6, 2024;
WHEREAS, on November 7, 2024, notices of the November 19, 2024 public hearing on the Vesting Tentative Subdivision Map were mailed to all property owners within a quarter mile of the property, according to the most recent Assessor’s roll, and to all local agencies expected to provide essential facilities or services to the Revised Project; and
//
//
//
Resolution/Mission Point Project - Vesting Tentative Subdivision Map, Option B Page 4 of 6 Rev: 7/27/2023
WHEREAS, on November 19, 2024, the City Council held a public hearing to consider the Revised Project, including the vesting tentative subdivision map, at which time all interested persons were given an opportunity to provide testimony and the Council considered the information presented in the Staff Report, and all verbal and written evidence.
NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.
2. Vesting Tentative Subdivision Map Findings. Pursuant to California Government Code Sections 66426 and 66428 and SCCC Section 17.05.300(h), the City Council finds and determines that:
A. The Vesting Tentative Subdivision Map for the Revised Project is consistent with the objectives, policies, general land uses and programs specified in the City’s General Plan in that the Vesting Tentative Subdivision Map for the Revised Project subdivides the existing 48.6- Acre Project Site into five lots, with up to three parcels for future parkland dedication and condominium purposes, subject to conditions set forth in the Conditions of Vesting Tentative Subdivision Map Approval for the Revised Project.
B. The design and improvements of the proposed subdivision are consistent with the City’s General Plan, in that the Vesting Tentative Subdivision Map facilitates the redevelopment of underutilized industrial parcels to provide housing and commercial opportunities for the north Santa Clara Area, which support the City’s Housing Goals and assist the City in achieving Regional Housing Needs Allocation (“RHNA:) targets for production of affordable housing units as mandated by the State, and in accordance with Affordable Housing ordinance.
C. The site is physically suitable for the proposed type of development, in that the Revised Project is compatible with the existing adjacent office, regional commercial, and light industrial uses and planned residential uses.
//
Resolution/Mission Point Project - Vesting Tentative Subdivision Map, Option B Page 5 of 6 Rev: 7/27/2023
D. The site is physically suitable for the proposed density of development, in that the Project Site is located in an urbanized area and is served by existing utilities and infrastructure.
E. The design of the subdivision and type of improvements are not likely to cause serious health problems, in that the proposed residential subdivision will implement Covenants, Conditions, and Restrictions for operation and maintenance of the building and site improvements and does not propose the use of hazardous materials.
F. The design of the subdivision and type of improvements are not likely to cause substantial environmental damage and will not substantially or unavoidably injure fish or wildlife or their habitat in that the Project Site is located in an urbanized setting, is a developed site, and the proposed subdivision includes mitigation measures, as identified in the Mission Point Project EIR. Although the EIR identified significant unavoidable environmental impacts in the resource areas of air quality and noise, the City Council made findings pursuant to Public Resources Code Section 21081 that there exist certain overriding economic, social and other considerations for approving the Revised Project that justify the occurrence of those impacts.
G. The design of the subdivision and type of improvements will not conflict with easements acquired by the public at large or use of property within the proposed subdivision in that it is designed to avoid encroachment and conflicts with public easements in the site design.
H. The Vesting Tentative Subdivision Map for the Revised Project provides, to the extent feasible, for future passive or natural heating or cooling opportunities, in that it would allow flexibility in the development standards to maximize the benefits of green building standards for site and building design.
//
//
//
//
//
3. Based on the findings set forth in this Resolution and the evidence in the Staff Report and such other evidence as received at the public hearings on this matter before the City Council, the City Council hereby approves the Vesting Tentative Subdivision Map for the Revised Project, substantially in the form on file as shown on the attached Vesting Tentative Subdivision Map for the Revised Project and Conditions of Vesting Tentative Subdivision Map Approval for the Revised Project, attached hereto and incorporated herein by this reference.
4. Effective date. This resolution shall become effective immediately.
I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED
AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 19TH DAY OF NOVEMBER, 2024, BY THE FOLLOWING VOTE:
AYES: COUNCILORS: Becker, Chahal, Hardy, Jain, Park, and Watanabe, and Mayor Gillmor
NOES: COUNCILORS:
ABSENT: COUNCILORS:
ABSTAINED: COUNCILORS:
Attachments incorporated by reference:
1. Vesting Tentative Subdivision Map
None
None
None
ATTEST:~
NORAPIMENlli,MM
ASSISTANT CITY CLERK
CITY OF SANTA CLARA
2. Conditions of Tentative Vesting Subdivision Map Approval, Option B Resolution/Mission Point Project - Vesting Tentative Subdivision Map, Option B Rev: 7/27/2023
APN 140-04-112
(PARCEL 37, 387 PM 44)
AREA = 6.33 ACRES
DEMOCRACY WAY ROW (AND UTILITIES)
TO BE VACATED
AREA = 2.58 ACRES ±
APN 140-04-111
(PARCEL 35, 387 PM 44)
AREA = 8.75 ACRES
APN 140-04-113
(PARCEL 36, 387 PM 44)
AREA = 7.15 ACRES
APN 140-04-065
(PARCEL 7, 368 PM 36-37)
AREA = 7.15 ACRES OLD IRONSIDE DRIVE (84' PUBLIC ROW)
APN 140-04-142
(PARCEL 2, 424 PM 24)
AREA = 1.99 ACRES
APN
140-04-143
(PARCEL 3,
424 PM 24)
AREA = 1.57
ACRES
APN 140-04-150
(PARCEL 1, 424 PM 24)
AREA = 2.99 ACRES PATRICK HENRY DRIVE (60' PUBLIC ROW)
S.F.P.U.C. HETCH HETCHY (80' PROPERTY OF CITY AND COUNTY OF SAN FRANCISCO)
TASMAN DRIVE
(PUBLIC ROW
VARIES)
APN 140-04-064
(PARCEL 8, 368 PM 36-37)
AREA = 7.27 ACRES
APN 140-04-151
(PARCEL 40, 405 PM 3)
AREA = 2.81 ACRES
scale
100
1" = 100'
0 100
feet
200
LEGEND
ABBREVIATIONS
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:06am C2.00 EXISTING BOUNDARY.dwg
KEY MAP
NTS EXISTING BOUNDARY
VTM-2
2 SS SS SS SS SS SS
SS
SS
SS
SS
SS SS
SS SS SS SS SS SS SS SS SS SS SS SS
SS SS SS
SS SS SS SS
SS
SS
SS SS SS SS
SS SS SS SS
SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS
SS SS
SS SS
SS
SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS SS
SS
SS SS SS
SS
SS
SS SS
SS
SS
SS SS SS SS SS SS SS SS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
SS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS
GAS
GAS
GAS
GAS GAS
GAS GASGAS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W W W W W W W W W W W
W
W
W W W
W W
W W W W W W W
W
W
E E E E
E E E E
E E E E
E
E
E E E E
E
E
E
E E
E
E
E E E
T
T
T
T
E
T
E
T
T
T T
T T T T T T T T T T T
T
T
T
T
T
T
T
T
T
T
T T T T T T T T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
T
T
E
E
E RW RW RW RW RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T T T T T T T T T T T T T T T T T T
W
E
E
E
E
E
E
E
E
E
E
E
T
T
T
T
T
T
E
E
E
E
E
E
E
E
E
T T
W
W
W
W
E E E
E
E
E
E
W
W
E
E E E E E E E E E E E E
T
T
T
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO
T
T
T
T
T
T
T
T
T
T
T
T
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW RW RW RW RW RW RW
T
D
D
D
D
D
D
D D
D
D
D
D
D
D
D
D
SS
SS
SS
SS
SS
SS
D
D
D
D
D
D
D
D
D
D
D
D
D
APN 140-04-112
(PARCEL 37, 387 PM 44)
AREA = 6.33 ACRES
DEMOCRACY WAY ROW (AND UTILITIES)
TO BE VACATED
AREA = 2.58 ACRES ±
APN 140-04-113
(PARCEL 36, 387 PM 44)
AREA = 7.15 ACRES
APN 140-04-065
(PARCEL 7, 368 PM 36-37)
AREA = 7.15 ACRES
APN 140-04-142
(PARCEL 2, 424 PM 24)
AREA = 1.99 ACRES
APN 140-04-143
(PARCEL 3, 424 PM 24)
AREA = 1.57 ACRES
APN 140-04-150
(PARCEL 1, 424 PM 24)
AREA = 2.99 ACRES
TASMAN DRIVE
(PUBLIC ROW VARIES)
APN 140-04-151
(PARCEL 40, 405 PM 3)
AREA = 2.81 ACRES
OLD IRONSIDE DRIVE
(84' PUBLIC ROW)
PATRICK HENRY DRIVE (60' PUBLIC ROW)
NOTES
NOTES
LEGEND
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:07am C4.00 EXISTING CONDITIONS.dwg
KEY MAP
NTS EXISTING CONDITIONS
VTM-3
3 MATCHLINE SEE SHEET VTM-4
SS SS SS SS SS SS
SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS
SS
SS
SS
SS SS SS SS SS SS SS SS SS
SS SS SS SS SS SS
SS
SS
SS SS SS SS SS SS SS
SS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E RW RW RW RW RW RW RW RW
RW
RW
RW
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW
SS
SS
SS
SS
SS
D
D
D
D
D
D
APN 140-04-112
(PARCEL 37, 387 PM 44)
AREA = 6.33 ACRES
APN 140-04-111
(PARCEL 35, 387 PM 44)
AREA = 8.75 ACRES
APN 140-04-113
(PARCEL 36, 387 PM 44)
AREA = 7.15 ACRES
APN 140-04-065
(PARCEL 7, 368 PM 36-37)
AREA = 7.15 ACRES OLD IRONSIDE DRIVE (84' PUBLIC ROW) PATRICK HENRY DRIVE (60' PUBLIC ROW) S.F.P.U.C. HETCH HETCHY
(80' PROPERTY OF CITY AND COUNTY OF SAN FRANCISCO)
APN 140-04-064
(PARCEL 8, 368 PM 36-37)
AREA = 7.27 ACRES
OLD GLORY LANE
NOTES
NOTES
LEGEND
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:07am C4.00 EXISTING CONDITIONS.dwg
KEY MAP
NTS EXISTING CONDITIONS
VTM-4
4 MATCHLINE SEE SHEET VTM-3
PATRICK HENRY DRIVE OLD IRONSIDES DRIVE
TASMAN DRIVE
OLD GLORY LANE
S.F.P.U.C. HETCH HETCHY
PARCEL E (84' PUBLIC ROW) (60' PUBLIC ROW) (80' PROPERTY OF CITY AND COUNTY OF SAN FRANCISCO)
PARCEL A
PARCEL B
PARCEL D PARCEL C
(PUBLIC ROW VARIES)
TASMAN DRIVE
(PUBLIC ROW VARIES) CALABAZAS CREEK CITY OF SUNNYVALE CITY OF SANTA CLARA
FUTURE PARK
PARCEL NORTH
FUTURE PARK
PARCEL SOUTHEAST
FUTURE PARK PARCEL
SOUTHWEST
165.00'
N87°52'43"W 124.25'
S45°00'00"E 15.96' S53°30'45"W 31.23' Δ=34°35'41"
R=43.00'
L=25.96'
N60°00'00"E 154.69'
92.92'N00°00'00"W 267.21'
S89°34'03"E 41.00' N00°00'00"W 345.10' S00°00'32"W 534.00' N90°00'00"W 159.92'
S00°00'00"E 126.00'
N90°00'00"W 80.00'
S00°00'01"E 60.00' N90°00'00"E 208.79' N00°00'01"W 60.00' S89°33'18"E 90.00' S00°00'00"W 293.88' N00°00'00"E 294.58' N90°00'00"W 58.79'
S90°00'00"E 80.00' N90°00'00"W 123.01' N00°00'00"W 190.00' N90°00'00"W 218.00' N90°00'00"W
59.38'
N00°00'39"E 52.00' Δ=98°57'15"
R=11.96'
L=20.65' Δ=59°54'51"
R=12.76'
L=13.34'
S39°48'56"W 25.87' Δ=50°11'24"
R=12.00'
L=10.51'
N89°59'43"W 316.37'
N00°00'00"E 385.25'
N90°00'00"E 164.50'
N00°00'00"E 69.56' N77°28'37"E 176.40'
S90°00'00"E 144.29'
N00°05'28"E 43.38'
S89°49'17"E 190.75'
N00°01'42"E 62.39'
S77°28'37"W 1,548.18'
N77°28'37"E 796.92' Δ=70°06'35"
R=245.32'
L=300.18'
N00°00'34"W 20.10'
S00°00'32"E 18.44'
scale
100
1" = 100' 0 100
feet
200
LEGEND
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:07am C3.00 PROPOSED PARCELIZATION.dwg
KEY MAP
NTS PROPOSED PARCELIZATION
VTM-5 5
PATRICK HENRY DRIVE
OLD IRONSIDES DRIVE
TASMAN DRIVE
(60'-84' PUBLIC ROW)
(84' PUBLIC ROW)
PARCEL A
PARCEL B
KYLLI DRIVE WEST KYLLI DRIVE EAST
(PUBLIC ROW VARIES)
PARCEL C
PARCEL D
GATEWAY PARK AREA
CENTRAL GREEN AREA
FUTURE PARK
PARCEL NORTH
LEGEND
NOTES
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:08am C6.00 PROPOSED EASEMENTS.dwg
KEY MAP
NTS PROPOSED EASEMENTS
VTM-6
6 MATCHLINE SEE SHEET VTM-7
PATRICK HENRY DRIVE OLD IRONSIDES DRIVE
OLD GLORY
LANE
S.F.P.U.C. HETCH HETCHY
PARCEL E (84' PUBLIC ROW) (60' PUBLIC ROW)
(80' PROPERTY OF CITY AND COUNTY OF SAN FRANCISCO)
PARCEL D
PARCEL C
KYLLI DRIVE WEST KYLLI DRIVE EAST
PARCEL A PARCEL B
CENTRAL GREEN AREA
SOUTH PARK AREA
FUTURE PARK
PARCEL NORTH
FUTURE PARK
PARCEL SOUTHEAST
FUTURE PARK
PARCEL SOUTHWEST
LEGEND
NOTES
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:08am C6.00 PROPOSED EASEMENTS.dwg
KEY MAP
NTS PROPOSED EASEMENTS
VTM-7
7 MATCHLINE SEE SHEET VTM-6
FUTURE PARK
PARCEL NORTH
CENTRAL GREEN AREA
GATEWAY PARK AREA
PARCEL A
PARCEL B
FUTURE PARK
PARCEL NORTH
CENTRAL GREEN AREA
GATEWAY PARK AREA
PARCEL A
PARCEL B
PATRICK HENRY DRIVE
OLD IRONSIDES DRIVE
TASMAN DRIVE
(60'-84' PUBLIC ROW)
(84' PUBLIC ROW)
KYLLI DRIVE WEST KYLLI DRIVE EAST
(PUBLIC ROW VARIES)
PODIUM A
COURTYARD,
S.L.P.
PODIUM B
COURTYARD,
S.L.P.
BUILDING A1
BUILDING A2
BUILDING A4
BUILDING A3
BUILDING B1
BUILDING B2
BUILDING B3
FUTURE PARK
PARCEL NORTH
CENTRAL GREEN AREA
GATEWAY PARK AREA
PARCEL A
PARCEL B
LEGEND
KEYNOTES
NOTES
’
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:08am C5.00 PROPOSED SITE PLAN.dwg
KEY MAP
NTS PROPOSED SITE PLAN
VTM-8
8 MATCHLINE SEE SHEET VTM-9 MATCHLINE SEE SHEET VTM-10 MATCHLINE SEE SHEET VTM-10
FUTURE PARK
PARCEL SOUTHWEST
FUTURE PARK
PARCEL SOUTHEAST
FUTURE PARK
PARCEL NORTH
SOUTH PARK
AREA
CENTRAL GREEN AREA
PARCEL D
PARCEL C
PARCEL E
FUTURE PARK
PARCEL SOUTHWEST
FUTURE PARK
PARCEL SOUTHEAST
FUTURE PARK
PARCEL NORTH
SOUTH PARK
AREA
CENTRAL GREEN AREA
PARCEL D
PARCEL C
PARCEL E PATRICK HENRY DRIVE OLD IRONSIDES DRIVE
OLD GLORY
LANE
S.F.P.U.C. HETCH HETCHY (84' PUBLIC ROW) (60' PUBLIC ROW) (80' PROPERTY OF CITY AND COUNTY OF SAN FRANCISCO)
KYLLI DRIVE WEST KYLLI DRIVE EAST
PODIUM D
COURTYARD,
S.L.P.
PODIUM C
COURTYARD,
S.L.P.
BUILDING A3 BUILDING B3
BUILDING D1
BUILDING D2
BUILDING D4
BUILDING C3 BUILDING C4
BUILDING C1 BUILDING C2
SUBSTATION
BUILDING D3
FUTURE PARK
PARCEL SOUTHWEST
FUTURE PARK
PARCEL SOUTHEAST
FUTURE PARK
PARCEL NORTH
SOUTH PARK
AREA
CENTRAL GREEN AREA
PARCEL D
PARCEL C
PARCEL E
LEGEND KEYNOTES
NOTES
’
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:08am C5.00 PROPOSED SITE PLAN.dwg
KEY MAP
NTS PROPOSED SITE PLAN
VTM-9
9 MATCHLINE SEE SHEET VTM-8
TASMAN DRIVE
(PUBLIC ROW VARIES) CITY OF SUNNYVALE CITY OF SANTA CLARA OLD IRONSIDES DRIVE GREAT AMERICA PARKWAY (140' PUBLIC ROW) Curve Table
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:09am C5.00 PROPOSED SITE PLAN.dwg
KEY MAP
NTS LINE AND CURVE TABLE
VTM-10
10 1 TASMAN DRIVE TO CITY LIMIT - 2 TASMAN DRIVE TO GREAT AMERICA PARKWAY INTERSECTION - MATCHLINE SEE SHEET VTM-8 MATCHLINE SEE SHEET VTM-8 D
D
D
D
D
D
D
D
D
D
D
D
D
GATEWAY PARK AREA
CENTRAL GREEN AREA
PARCEL A
PODIUM
FF = 15.0
PARCEL B
PODIUM
FF = 15.0
PARCEL D
PODIUM
PARCEL C
PODIUM
PATRICK HENRY DRIVE
OLD IRONSIDES DRIVE
TASMAN DRIVE
KYLLI DRIVE WEST KYLLI DRIVE EAST
LEGEND
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:09am C7.00 PROPOSED GRADING.dwg
KEY MAP
NTS PROPOSED GRADING
VTM-11
11 MATCHLINE SEE SHEET VTM-12
DDD DD D
CENTRAL GREEN AREA
SOUTH PARK AREA
PARCEL D
PODIUM
FF = 17.0
PARCEL C
PODIUM
FF = 17.0 PATRICK HENRY DRIVE OLD IRONSIDE DRIVE
KYLLI DRIVE WEST KYLLI DRIVE EAST
LEGEND
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:09am C7.00 PROPOSED GRADING.dwg
KEY MAP
NTS PROPOSED GRADING
VTM-12
12 MATCHLINE SEE SHEET VTM-11
PARCEL A
PARCEL B
PARCEL C
PARCEL D SS SS SS SS SS SS
SS SS SS SS
SS
SS
SS SS SS SS
SS SS SS SS
SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS
SS SS
SS SS
SS
SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS
GAS
GAS
GAS
GAS GAS
GAS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W W
W W W W W W W
W
W
E E E
E
E E E E
E E E E
E
E
E E E E
E
E
T
T
T
T
E
T
E
T
T
T T
T T T T T T T T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
T
T
E
E
E RW RW RW RW RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T T T T T T T T T T T T T T T T T T
W
E
E
E
E
E
E
E
E
E
E
E
T
T
T
T
T
T
E
E
E
E
E
E
E
E
W
W
W
W
E E E E E E E E E E E E
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO
T
T
T
T
T
T
T
T
T
T
T
T
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW RW RW RW RW RW RW
T
D
SS
SS
SS
SS
SS
SS
D
D
D
D
D
D
D
D
D
D
D
D WV
WV
WV
WV WV TASMAN DRIVE
OLD IRONSIDES DRIVE
PATRICK HENRY DRIVE
KYLLI DRIVE WEST KYLLI DRIVE EAST
GATEWAY
PARK AREA OLD IRONSIDES DRIVE
CENTRAL GREEN AREA
NOTES
·
·
·
·
·
COPYRIGHT © BKF ENGINEERS 2024 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Feb 06, 2024 at 11:14am C8.00 PROPOSED UTILITY PLAN.dwg
KEY MAP
NTS PROPOSED UTILITY PLAN - SS OPTION 2A
VTM-13.1
13 MATCHLINE SEE SHEET
VTM-13.2
SEE VTM-13.2 FOR INSET
1 PARCEL E
PARCEL D
PARCEL C
PARCEL A PARCEL B SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T E E E E E E E E E E E E E E E E E E E RW RW RW RW RW RW RW RW RW RW RW W W W W W W W W W W W W E E E E E E E E E E E E E E E E E RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW SS
SS
SS SS SS DDD DD D WV
SOUTH PARK AREA
S.F.P.U.C. HETCH HETCHY
KYLLI DRIVE WEST KYLLI DRIVE EAST PATRICK HENRY DRIVE OLD IRONSIDES DRIVE
CENTRAL GREEN AREA
OLD GLORY LANE SS SS SS SS SS
SS SS SS SS SS
SS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS W W W E E E E E E E E E TT E W W W T E E T
SS SS SS D D D D D D WV
NOTES ····· SS SS SS GAS GAS GAS GAS GAS W W W T T T E E E RW RWW W W
SS SS SS SS SS SS D D D WV
OLD GLORY LANE
COPYRIGHT © BKF ENGINEERS 2024 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Feb 06, 2024 at 11:10am C8.00 PROPOSED UTILITY PLAN.dwg
KEY MAP
NTS PROPOSED UTILITY PLAN - SS OPTION 2A
VTM-13.2
14 MATCHLINE SEE SHEET
VTM-13.1
INSET 1
1" = 60' MATCHLINE SEE INSET 2
INSET 2
1" = 60'
PARCEL A
PARCEL B
PARCEL C
PARCEL D SS SS SS SS SS SS
SS SS SS SS
SS
SS
SS SS SS SS
SS SS SS SS
SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS SS
SS SS
SS SS
SS
SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS
GAS GAS GAS GAS GAS
GAS GAS GAS GAS
GAS
GAS
GAS
GAS GAS
GAS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W W
W W W W W W W
W
W
E E E
E
E E E E
E E E E
E
E
E E E E
E
E
T
T
T
T
E
T
E
T
T
T T
T T T T T T T T T T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
T
T
E
E
E RW RW RW RW RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T T T T T T T T T T T T T T T T T T
W
E
E
E
E
E
E
E
E
E
E
E
T
T
T
T
T
T
E
E
E
E
E
E
E
E
W
W
W
W
E E E E E E E E E E E E
FO
FO
FO
FO
FO
FO
FO FO FO FO FO FO
T
T
T
T
T
T
T
T
T
T
T
T
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW
RW RW RW RW RW RW RW
T
D
SS
SS
SS
SS
SS
SS
D
D
D
D
D
D
D
D
D
D
D
D WV
WV
WV
WV WV TASMAN DRIVE
OLD IRONSIDES DRIVE
PATRICK HENRY DRIVE
KYLLI DRIVE WEST KYLLI DRIVE EAST
GATEWAY
PARK AREA OLD IRONSIDES DRIVE
CENTRAL GREEN AREA
NOTES
·
·
·
·
·
COPYRIGHT © BKF ENGINEERS 2024 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Feb 06, 2024 at 11:10am C8.00 PROPOSED UTILITY PLAN.dwg
KEY MAP
NTS PROPOSED UTILITY PLAN - SS OPTION 3A
VTM-14.1
15 MATCHLINE SEE SHEET
VTM-14.2
SEE VTM-14.2 FOR INSET
1 PARCEL E
PARCEL D
PARCEL C
PARCEL A PARCEL B SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T E E E E E E E E E E E E E E E E E E E RW RW RW RW RW RW RW RW RW RW RW W W W W W W W W W W W W E E E E E E E E E E E E E E E E E RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW SS
SS
SS SS SS DDD DD D WV
SOUTH PARK AREA
S.F.P.U.C. HETCH HETCHY
KYLLI DRIVE WEST KYLLI DRIVE EAST PATRICK HENRY DRIVE OLD IRONSIDES DRIVE
CENTRAL GREEN AREA
OLD GLORY LANE
NOTES ····· SS SS SS SS SS
SS SS SS SS SS
SS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS W W W E E E E E E E E E TT E W W W T E E T
SS SS SS D D D D D D WV
COPYRIGHT © BKF ENGINEERS 2024 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Feb 06, 2024 at 11:10am C8.00 PROPOSED UTILITY PLAN.dwg
KEY MAP
NTS PROPOSED UTILITY PLAN - SS OPTION 3A
VTM-14.2
16 MATCHLINE SEE SHEET
VTM-14.1
INSET 1
1" = 60'
FO FO FO FO FO FO D D D D DD DD D D DDD DD D PATRICK HENRY DRIVE OLD IRONSIDES DRIVE
TASMAN DRIVE
OLD GLORY LANE
S.F.P.U.C. HETCH HETCHY
KYLLI DRIVE WEST KYLLI DRIVE EAST
PARCEL A
PARCEL B
PARCEL D PARCEL C
6-OFF
DMA 15A
DMA 29A
DMA 27B
DMA 2A
DMA 25B
DMA 2B
DMA 3A
DMA 4A
DMA 24B
DMA 25A
DMA 24A
DMA 5A
DMA 4C
DMA 26B
DMA 9A
DMA 20A
DMA 30A
DMA 10A
DMA 11A
DMA 22A
DMA 33A
DMA 31A
DMA 23A
DMA 18F
DMA 4B
DMA 12A
DMA 13B
DMA 13A
DMA 12B
DMA 18A
DMA 19A
DMA 26A
DMA 16A
DMA 1A
DMA 14B
DMA 17A DMA 17B
DMA 1B
DMA 6A
DMA 18C
DMA 18B
DMA 21C
DMA 1 - OFF
DMA 2 - OFF
DMA 3 - OFF
DMA 4A - OFF
DMA 5 - OFF
DMA 6 - OFF
DMA 7 - OFF
DMA 8 - OFF
DMA 27A
DMA 8A
DMA 3B
DMA 7A
DMA 18D
DMA 21A
DMA 19B
DMA 19C
DMA 28B
DMA 24C
DMA 32A
DMA 14A
DMA 18E
DMA 21B
DMA 28A
25 17
13 19 7
20 1
12 30
22 9
23 11
10 33
32 2
14 24
16 28 4 3
6A 5A
15 18
27 26
31 21
29 DMA 8B
LEGEND
DMA 1 1
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:12am C9.00 PROPOSED STORMWATER PLAN.dwg
KEY MAP
NTS PROPOSED STORMWATER PLAN
VTM-15
17 scale
100
1" = 100' 0 100
feet
200
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:12am C9.00 PROPOSED STORMWATER PLAN.dwg
KEY MAP
NTS STORMWATER DETAILS
VTM-16
18 1 BIORETENTION PLANTER - 2 FLOW-THROUGH PLANTER - 3 CITY OF SANTA CLARA C3 TREATMENT NOTES - 4 SOURCE CONTROL TABLE -
KEY NOTES
KEY
KEY
NOTES
SECTION AT TREE WELL
KEY NOTES
SECTION AT CATCH BASIN
LONGITUDINAL SECTION
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:12am C9.00 PROPOSED STORMWATER PLAN.dwg
KEY MAP
NTS STORMWATER DETAILS
VTM-17
19 1 SILVA CELLS SECTION DETAIL
-
2 SILVA CELLS PLAN VIEW
-
3 -
4 SILVA CELLS ADJACENT TO PARKING DETAIL
-
FO FO FO FO FO FO D D D D DD D D D D D DDD DD D
PARCEL A PARCEL B
PARCEL C PARCEL E
SUBSTATION
PARCEL D PATRICK HENRY DRIVE OLD IRONSIDES DRIVE
TASMAN DRIVE
OLD GLORY LANE
S.F.P.U.C. HETCH HETCHY
KYLLI DRIVE WEST KYLLI DRIVE EAST
LEGEND
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:13am C10.00 EROSION CONTROL PLAN.dwg
KEY MAP
NTS EROSION CONTROL PLAN
VTM-18
20 scale
100
1" = 100' 0 100
feet
200
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:13am C10.00 EROSION CONTROL PLAN.dwg
KEY MAP
NTS EROSION CONTROL NOTES AND DETAILS
VTM-19
21 COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:13am C10.00 EROSION CONTROL PLAN.dwg
KEY MAP
NTS EROSION CONTROL NOTES AND DETAILS
VTM-20
22 PATRICK HENRY DRIVE
PODIUM A
FF = 15.00
BASEMENT
PODIUM A
FF = 15.00
BASEMENT
TASMAN DRIVE
PODIUM B
FF = 15.00
BASEMENT
TASMAN DRIVE
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:13am C10.00 STREET SECTIONS.dwg
KEY MAP
NTS PROPOSED CROSS SECTIONS
VTM-21
23 A PATRICK HENRY DRIVE NORTH STREET SECTION
VTM-8 B TASMAN DRIVE WEST STREET SECTION
VTM-8 C TASMAN DRIVE EAST STREET SECTION
VTM-8
PODIUM B
FF = 15.00
BASEMENT
OLD IRONSIDE DRIVE
PODIUM A
FF = 15.00
BASEMENT
PODIUM C
FF = 17.00
BASEMENT
PODIUM B
FF = 15.00
BASEMENT
KYLLI DRIVE WEST
BASEMENT
PODIUM B
FF = 15.00
BASEMENT
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:14am C10.00 STREET SECTIONS.dwg
KEY MAP
NTS PROPOSED CROSS SECTIONS
VTM-22
24 D OLD IRONSIDES DRIVE NORTH STREET SECTION
VTM-8 E CENTRAL GREEN AREA SECTION
VTM-8 F KYLLI DRIVE WEST STREET SECTION
VTM-8
PODIUM C
FF = 17.00
BASEMENT
PODIUM B
FF = 15.00
BASEMENT
KYLLI DRIVE EAST
BASEMENT
PODIUM D
FF = 17.00
BASEMENT
PATRICK HENRY DRIVE
PODIUM D
FF = 17.00
BASEMENT
S.F.P.U.C. HETCH HETCHY
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:14am C10.00 STREET SECTIONS.dwg
KEY MAP
NTS PROPOSED CROSS SECTIONS
VTM-23
25 G KYLLI DRIVE EAST STREET SECTION
VTM-8
H PATRICK HENRY DRIVE SOUTH STREET SECTION
VTM-9
I SOUTH PARK AREA SECTION
VTM-9
PODIUM D
FF = 17.00
BASEMENT
SOUTH PARK AREA
PODIUM C
FF = 17.00
BASEMENT
S.F.P.U.C. HETCH HETCHY
SOUTH PARK AREA
PRIVATE STREET
PODIUM D
FF = 17.00
BASEMENT
OLD IRONSIDE DRIVE
PODIUM C
FF = 17.00
BASEMENT
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:14am C10.00 STREET SECTIONS.dwg
KEY MAP
NTS PROPOSED CROSS SECTIONS
VTM-24
26 J SOUTH PARK AREA CENTRAL SECTION
VTM-9
K SOUTH PARK AREA EAST SECTION
VTM-9
L OLD IRONSIDES DRIVE SOUTH STREET SECTION
VTM-9
PATRICK HENRY DRIVE
PODIUM A
FF = 15.00
BASEMENT
NOTES
PODIUM B
FF = 15.00
BASEMENT
OLD IRONSIDE DRIVE
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:14am C10.00 STREET SECTIONS.dwg
KEY MAP
NTS PROPOSED CROSS SECTIONS
VTM-25
27 M NORTH OF PATRICK HENRY DRIVE SECTION
VTM-8 N NORTH OF OLD IRONSIDE DRIVE SECTION
VTM-8
GATEWAY PARK AREA
CENTRAL GREEN AREA
PATRICK HENRY DRIVE
OLD IRONSIDES DRIVE
TASMAN DRIVE
PARCEL A
PARCEL B
KYLLI DRIVE WEST KYLLI DRIVE EAST
LEGEND
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:15am C12.00 PROPOSED FIRE ACCESS PLAN.dwg
KEY MAP
NTS PROPOSED FIRE ACCESS PLAN
VTM-26
28 MATCHLINE SEE SHEET VTM-27
CENTRAL GREEN AREA
SOUTH PARK AREA PATRICK HENRY DRIVE OLD IRONSIDES DRIVE OLD GLORY LANE S.F.P.U.C. HETCH HETCHY
PARCEL E
PARCEL D
PARCEL C
KYLLI DRIVE WEST KYLLI DRIVE EAST
PARCEL A PARCEL B
LEGEND
NOTES
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:15am C12.00 PROPOSED FIRE ACCESS PLAN.dwg
KEY MAP
NTS PROPOSED FIRE ACCESS PLAN
VTM-27
29 MATCHLINE SEE SHEET VTM-26
SS SS SS SS SS SS SS SS SS SS SS SS SS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS W W W W W W W W W W W W W T T T T T T T T T T T T E E E E E E E E E E E E E RW RW RW RW RW RW RW RW RW RW RW
SS SS SSD
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:15am C13.01 TS KYLLI DR WEST.dwg
KEY MAP
NTS TRAFFIC SIGNAL INSTALLATION PLAN - KYLLI DR WEST
VTM-28
30 SS SS SS SS SS SS SS SS SS GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T E E E E E E E E E E E E E E RW RW RW RW RW RW RWW W W W W W W W W W D D COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:15am C13.02 TS OLD GLORY LANE.dwg
KEY MAP
NTS TRAFFIC SIGNAL INSTALLATION PLAN - OLD GLORY LANE
VTM-29
31 SS SS SS SS SS SS SS SS SS SS SS SS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS T T T T T T T T T T E E E E E E E E E E E E E E E E E E E E E E E E RW RW RW RW RW RW RW RWRW RW RW RW RW RW RW W W W W W W W W W W W W E ESS SS SS D COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:16am C13.04 TS OLD IRONSIDES_KYLLI DR EAST.dwg
KEY MAP
NTS TRAFFIC SIGNAL INSTALLATION PLAN - KYLLI DR EAST
VTM-30
32 SS SS SS SS SS SS SS SS SS SS SS SS SS SS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS T T E E E E E E E E E E E E E E E E E E E E E E E T T T RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW RW W W W W W W W W W W W W W FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T T T
SS SS SS SS
COPYRIGHT © BKF ENGINEERS 2023 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 19, 2023 at 11:16am C13.03 TS OLD IRONSIDES_PARCEL B.dwg
KEY MAP
NTS TRAFFIC SIGNAL INSTALLATION PLAN - PARCEL B
VTM-31
33 VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER
PARCEL
PARCEL C PARCEL D PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER
PARCEL
PARCEL C PARCEL D
PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 VEHICUL R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D
PARCEL E
NOTES UTILITY PHASING OPTION A - SCENARIO 1
A-SC-1
COPYRIGHT © BKF ENGINEERS 2024 34 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Jul 22, 2024 at 10:30am C14.00 PROPOSED PHASING PLANS.dwg
KEY MAP
NTS
UTILITY PHASING OPTION A - SCENARIO 1 - AREA D
UTILITY PHASING OPTION A - SCENARIO 1 - AREA B
UTILITY PHASING OPTION A - SCENARIO 1 - AREA C
UTILITY PHASING OPTION A - SCENARIO 1 - AREA A scale 1" = 200' 200 0 200
feet
400
L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE
PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C
PARCEL D
PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE
PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C
PARCEL D
PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE
PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C
PARCEL D
PARCEL E VEHICUL VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE
PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C
PARCEL D
PARCEL E
NOTES UTILITY PHASING OPTION A - SCENARIO 2
A-SC-2
COPYRIGHT © BKF ENGINEERS 2024 35 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Jul 22, 2024 at 10:31am C14.00 PROPOSED PHASING PLANS.dwg
KEY MAP
NTS
UTILITY PHASING OPTION A - SCENARIO 2 - AREA C
UTILITY PHASING OPTION A - SCENARIO 2 - AREA B
UTILITY PHASING OPTION A - SCENARIO 2 - AREA D
UTILITY PHASING OPTION A - SCENARIO 2 - AREA A scale 1" = 200' 200 0 200
feet
400
VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D
PARCEL E L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C PARCEL D PARCEL E VEHICUL VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D
PARCEL E
NOTES UTILITY PHASING OPTION A - SCENARIO 3
A-SC-3
COPYRIGHT © BKF ENGINEERS 2024 36 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Jul 22, 2024 at 10:31am C14.00 PROPOSED PHASING PLANS.dwg
KEY MAP
NTS
UTILITY PHASING OPTION A - SCENARIO 3 - AREA C
UTILITY PHASING OPTION A - SCENARIO 3 - AREA D
UTILITY PHASING OPTION A - SCENARIO 3 - AREA B
UTILITY PHASING OPTION A - SCENARIO 3 - AREA A scale 1" = 200' 200 0 200
feet
400
VEHICUL R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D
PARCEL E R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D
PARCEL E L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER
PARCEL
PARCEL C PARCEL D
PARCEL E VEHICUL VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D
PARCEL E
NOTES UTILITY PHASING OPTION A - SCENARIO 4
A-SC-4
COPYRIGHT © BKF ENGINEERS 2024 37 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Jul 22, 2024 at 10:31am C14.00 PROPOSED PHASING PLANS.dwg
KEY MAP
NTS
UTILITY PHASING OPTION A - SCENARIO 4 - AREA C
UTILITY PHASING OPTION A - SCENARIO 4 - AREA A
UTILITY PHASING OPTION A - SCENARIO 4 - AREA B
UTILITY PHASING OPTION A - SCENARIO 4 - AREA D scale 1" = 200' 200 0 200
feet
400
VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C PARCEL D PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C PARCEL D PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E VEHICUL VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E
NOTES UTILITY PHASING OPTION B - SCENARIO 1
B-SC-1
COPYRIGHT © BKF ENGINEERS 2024 38 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Jul 22, 2024 at 10:32am C14.00 PROPOSED PHASING PLANS.dwg
KEY MAP
NTS
UTILITY PHASING OPTION B - SCENARIO 1 - AREA D
UTILITY PHASING OPTION B - SCENARIO 1 - AREA B
UTILITY PHASING OPTION B - SCENARIO 1 - AREA C
UTILITY PHASING OPTION B - SCENARIO 1 - AREA A scale 1" = 200' 200 0 200
feet
400
L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C PARCEL D PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C PARCEL D PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E VEHICUL VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E
NOTES UTILITY PHASING OPTION B - SCENARIO 2
B-SC-2
COPYRIGHT © BKF ENGINEERS 2024 39 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Jul 22, 2024 at 10:32am C14.00 PROPOSED PHASING PLANS.dwg
KEY MAP
NTS
UTILITY PHASING OPTION B - SCENARIO 2 - AREA C
UTILITY PHASING OPTION B - SCENARIO 2 - AREA B
UTILITY PHASING OPTION B - SCENARIO 2 - AREA D
UTILITY PHASING OPTION B - SCENARIO 2 - AREA A scale 1" = 200' 200 0 200
feet
400
ECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C PARCEL D PARCEL E R TUNEL CONNECTION ECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION ECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E VEHICUL VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION ECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E
NOTES UTILITY PHASING OPTION B - SCENARIO 3
B-SC-3
COPYRIGHT © BKF ENGINEERS 2024 40 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Jul 22, 2024 at 10:33am C14.00 PROPOSED PHASING PLANS.dwg
KEY MAP
NTS
UTILITY PHASING OPTION B - SCENARIO 3 - AREA C
UTILITY PHASING OPTION B - SCENARIO 3 - AREA D
UTILITY PHASING OPTION B - SCENARIO 3 - AREA B
UTILITY PHASING OPTION B - SCENARIO 3 - AREA A scale 1" = 200' 200 0 200
feet
400
L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
DEMOCRACY WAY
REMAINDER PARCEL
PARCEL C PARCEL D PARCEL E R TUNEL CONNECTION L CONNECTION OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D
PARCEL E R TUNEL CONNECTION L CONNECTION VEHICUL OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D PARCEL E VEHICULAR TUN
RAMP DOWN TO B1
RAMP UP FROM B1 R TUNEL CONNECTION L CONNECTION VEHICUL OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL A PARCEL B
PARCEL C PARCEL D
PARCEL E
NOTES UTILITY PHASING OPTION B - SCENARIO 4
B-SC-4
COPYRIGHT © BKF ENGINEERS 2024 41 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Jul 22, 2024 at 10:33am C14.00 PROPOSED PHASING PLANS.dwg
KEY MAP
NTS
UTILITY PHASING OPTION B - SCENARIO 4 - AREA C
UTILITY PHASING OPTION B - SCENARIO 4 - AREA A
UTILITY PHASING OPTION B - SCENARIO 4 - AREA B
UTILITY PHASING OPTION B - SCENARIO 4 - AREA D scale 1" = 200' 200 0 200
feet
400
VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1
REMAINDER PARCEL
PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION
REMAINDER PARCEL
PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION
REMAINDER PARCEL
PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE R TUNEL CONNECTION PARCEL A PARCEL B
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION
REMAINDER PARCEL
PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE R TUNEL CONNECTION PARCEL B VEHICUL PARCEL A PARCEL C PARCEL D TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 1 TR-SC-1
COPYRIGHT © BKF ENGINEERS 2023 42 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 15, 2023 at 4:14pm C15.00 TRAFFIC PHASING PLANS.dwg
KEY MAP
NTS
TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 1 - AREA D TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 1 - AREA B TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 1 - AREA C TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 1 - AREA A NOTES
ECTION PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
REMAINDER
PARCEL
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
REMAINDER
PARCEL
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
REMAINDER
PARCEL R TUNEL CONNECTION PARCEL A PARCEL B
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
REMAINDER
PARCEL R TUNEL CONNECTION PARCEL B VEHICUL PARCEL A
PARCEL C PARCEL D TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 2 TR-SC-2
COPYRIGHT © BKF ENGINEERS 2023 43 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 15, 2023 at 4:35pm C15.00 TRAFFIC PHASING PLANS.dwg
KEY MAP
NTS
TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 2 - AREA C TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 2 - AREA B TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 2 - AREA D TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 2 - AREA A NOTES
ECTION
REMAINDER
PARCEL
PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D ECTION PARCEL E R TUNEL CONNECTION PARCEL A PARCEL B OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION PARCEL E R TUNEL CONNECTION PARCEL A PARCEL B OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION
REMAINDER
PARCEL
PARCEL E
DEMOCRACY WAY VEHICUL R TUNEL CONNECTION PARCEL A PARCEL B OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 3 TR-SC-3
COPYRIGHT © BKF ENGINEERS 2023 44 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 15, 2023 at 4:16pm C15.00 TRAFFIC PHASING PLANS.dwg
KEY MAP
NTS
TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 3 - AREA C TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 3 - AREA D TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 3 - AREA B TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 3 - AREA A NOTES
ECTION
REMAINDER
PARCEL
PARCEL E
DEMOCRACY WAY OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D ECTION PARCEL E R TUNEL CONNECTION PARCEL A PARCEL B OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D ECTION
REMAINDER
PARCEL
PARCEL E
DEMOCRACY WAY VEHICUL R TUNEL CONNECTION PARCEL A PARCEL B OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D VEHICULAR TUNEL CON
RAMP DOWN TO B1
RAMP UP FROM B1 ECTION
REMAINDER
PARCEL
PARCEL E
DEMOCRACY WAY VEHICUL R TUNEL CONNECTION PARCEL A PARCEL B OLD IRONSIDES DRIVE OLD GLORY LANE PATRICK HENRY DRIVE
TASMAN DRIVE
PARCEL C PARCEL D TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 4 TR-SC-4
COPYRIGHT © BKF ENGINEERS 2023 45 45 MISSION POINT VESTING TENTATIVE MAP FOR CONDOMINIUM PURPOSES CITY OF SANTA CLARA, CALIFORNIA BKF ENGINEERS 255 SHORELINE DRIVE SUITE 200 REDWOOD CITY, CA 94065 (650) 482-6300 www.bkf.com Plot Dec 15, 2023 at 4:17pm C15.00 TRAFFIC PHASING PLANS.dwg
KEY MAP
NTS
TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 4 - AREA C TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 4 - AREA A TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 4 - AREA B TRANSPORTATION INFRASTRUCTURE PHASING PLANS - SCENARIO 4 - AREA D NOTES
CC Date: November 19, 2024 Page 1
Conditions of Tentative Vesting Subdivision Map Approval PLN22-00635 / 4995 Patrick Henry Drive & 3005 Democracy Way Project Description: Tentative Map to subdivide the property into five lots (includes the vacation of Democracy Way)
GENERAL
G1. Effective Date. This Permit shall only become effective at such time as the General Plan Amendment, PD Zoning, and Development Agreement have been adopted by the Decision-making body and have taken effect.
G2. Conformance with Plans. Prior to the issuance of Building Permit, the development of the site and all associate improvements shall conform to the approved plans on file with the Community Development Department, Planning Division. No change to the plans will be made without prior review by the Planning Division through approval of a Minor Amendment or through an Architectural Review, at the discretion of the Director of Community Development or designee. Each change shall be identified and justified in writing.
G3. Conditions of Plans. All conditions of approval for this Permit shall be reprinted and included within the first three sheets of the building permit plan sets submitted for review and approval. At all times these conditions of approval shall be on all grading and construction plans kept on the project site.
G4. Necessary Relocation of Public Facility. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.
G5. Indemnify and Hold Harmless. The owner or designee agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorney’s fees, injuries, costs, and liabilities from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of owner or designee’s project.
G6. Code Compliance. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis; proposed use and occupancy of all spaces (CBC Ch. 3), all building heights and areas (CBC Ch. 5), all proposed types of construction (CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (CBC Ch. 7), all proposed interior finishes fire resistance (CBC Ch. 8), all fire protection systems proposed (CBC Ch. 9), and all means of egress proposed (CBC Ch. 10). Noncombustable exterior wall, floor, and roof finishes are strongly encouraged. a. During construction retaining a single company to install all fire related penetrations is highly recommended.
b. The grade level lobbies shall be minimum 1-hour rated all sides and above. c. All stair shafts shall be minimum 1-hour rated.
d. All elevator shafts shall be minimum 1-hour rated.
e. All trash chute shafts shall be minimum 1-hour rated. f. Recommendation: provide minimum two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room. g. Any trash rooms shall be minimum 1-hour rated all sides and above.
G7. Building Codes as Amended. See Title 15 of the Santa Clara City Code for any amendments to the California Building Codes.
Conditions of Approval PLN22-0635 / 4995 Patrick Henry Drive & 3005 Democracy Way CC Date: November 19, 2024 Page 2
G8. Reach Codes. This project is subject to the provisions of the City of Santa Clara 2022 Reach Code, effective January 2022. See Ordinance No. 2034 and/or Title 15 of the Santa Clara City Code.
a. Chapter 15.36 – Energy Code for “all electric” provisions for new construction. b. Chapter 15.38 – Green Building Code for additional Electric Vehicle Charging requirements for new construction.
G9. Comply with all applicable codes, regulations, ordinances and resolutions.
COMMUNITY DEVELOPMENT – PLANNING DIVISION
P1. The project shall comply with the Conditions of Approval for the associated Planned Development Rezoning (PLN2018-13400) and any subsequent Architectural Review approvals.
PARKS & RECREATION DEPARTMENT
PR1. The parcel(s) that may be set aside for the future park shall not be deemed accepted by the City, nor shall it be deeded to the City as an easement or fee simple, until (1) the Commission has made recommendation to City Council and Council then approves the park, and (2) the park improvements have been completed and accepted by the City in accordance with a Park Agreement that the developer is required to enter into with the City.
PUBLIC WORKS DEPARTMENT - ENGINEERING
DESIGN / PERFORMANCE—PRIOR TO BUILDING PERMIT ISSUANCE
E1. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be identified for compliance during the site clearance process. Contact Public Works Department at (408) 615-3000 for further information.
E2. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.
E3. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.
E4. Obtain Council approval of a resolution ordering vacation of Democracy Way street rightof-way, through Public Works Department, and pay all appropriate fees, and fair market value, prior to building permit issuance for Phase 1 of project development.
E5. All utilities within Democracy Way shall be relocated prior to summary vacation of Democracy Way.
E6. Bioretention areas shall be outside of the public ROW and public easements.
E7. Developer shall complete the relocation of utilities within Democracy Way prior to Council approval of a resolution ordering the vacation of Democracy Way street right-of-way and prior to recordation of the Final Map.
Conditions of Approval PLN22-0635 / 4995 Patrick Henry Drive & 3005 Democracy Way CC Date: November 19, 2024 Page 3
E8. Prior to issuance of building permit for Phase 1, pay appropriate fee through Public Works Department to initiate the processing of a Grant Deed or easement document, per SVP requirements, for dedication of electric substation to the City.
E9. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.
E10. Submit public improvement plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.
E11. Maintain required vertical height clearance from top of pavement to bottom of skybridge per Santa Clara Fire Department.
E12. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.
E13. Terminate public right-of-way encroachment agreements and remove PVC conduits crossing Democracy Way (SC 15,643) and Patrick Henry Drive (SC 15,727).
E14. Dedicate, as required, on-site easements for new sidewalk, storm drain main, and any other new utilities by means of Subdivision Map or approved instrument at time of development.
STREETS DIVISION
General Condition: The Streets Division deems the Rezone and General Plan Amendment complete, however, the Streets Division will need to review and approve the architectural review for these individual projects to ensure that they meet right-of-way landscape, solid waste and stormwater requirements. The plans provided for the rezone and GPA only included overall conceptual plans, which is not enough detail for Streets to provide an appropriate review.
Right of Way Landscape
DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT L1. Include City of Santa Clara Tree Preservation/City Arborist specifications on all improvement plans.
L2. Identify existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.
L3. 2:1 tree replacement ratio required for all trees removed from site.
DURING CONSTRUCTION OR OPERATION
L4. No cutting of any part of public, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).
PRIOR TO FINAL OF BUILDING PERMIT
L5. If 2:1 replacement ratio can not be met for removal of right of way landscape trees, tree planting fee must be paid prior to building permit final.
Conditions of Approval PLN22-0635 / 4995 Patrick Henry Drive & 3005 Democracy Way CC Date: November 19, 2024 Page 4
Solid Waste
DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT SW1. The applicant shall complete and provide the Post-Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type. Contact the Public Works Department at [email protected] or (408) 615-3080 for more information.
SW2. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, trash enclosures and trash staging areas. The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines. Solid metal roof, gates and a trench drain shall be installed within the trash enclosure and connected to the on-site sewer system.
SW3. For projects that involve construction, demolition or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section 8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list. Applicant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/.
SW4. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Insert the General Notes for the Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.
SW5. Project applicant shall contact the Public Works Department, Street Maintenance Division at (408) 615-3080 to verify if the property falls within the City’s exclusive franchise hauling area. If so, the applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.
DURING CONSTRUCTION OR OPERATION
SW6. Applicant to track all waste generated and upload debris tags to GreenHalo for City staff review.
PRIOR TO FINAL OF BUILDING PERMIT
SW7. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and Conditions of Approval PLN22-0635 / 4995 Patrick Henry Drive & 3005 Democracy Way CC Date: November 19, 2024 Page 5
construction activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required.
Stormwater
DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT ST1. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.
ST2. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter (on design) shall be submitted with the Plan.
ST3. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).
ST4. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans. Applicant to add Source control measures with designations from C.3 stormwater handbook, Appendix H.
ST5. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.
ST 6. Include C.3 Stormwater Treatment Facilities Construction general notes on the improvement plans.
ST7. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.
ST8. For single-family homes and other small projects that create and/or replace 2,500 – 10,000 square feet of impervious surface area, the applicant shall implement at least one of the following site design measures:
a. Direction of roof runoff into cisterns or rain barrels b. Direction of roof, sidewalk, walkway, patio, driveway, or parking lot runoff onto vegetated areas
c. Construction of sidewalks, walkways, patios, bike lanes, driveways, and parking lots with permeable surfaces
Plans shall specify which site design measures are selected for the project and show the direction of flow from impervious surfaces to the selected site design measures. All measures shall meet the design criteria in the 2016 C.3.
Stormwater Handbook, Appendix K: Standard Specifications for Lot-Scale Measures for Small Projects.
Conditions of Approval PLN22-0635 / 4995 Patrick Henry Drive & 3005 Democracy Way CC Date: November 19, 2024 Page 6
ST9. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.
ST10. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.
ST11. The use of architectural copper is prohibited.
DURING CONSTRUCTION OR OPERATION
ST12. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).
ST13. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).
ST14. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.
ST15. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.
ST16. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.
PRIOR TO FINAL OF BUILDING PERMIT
ST17. As-Built drawing shall be submitted to the Public Works Department.
ST18. Applicant shall schedule and City shall conduct a final C.3 inspection.
ST10. Permeable Pavement, Media Filter vaults, Interceptor Trees and Trash Full Capture Devices shall be inspected by a third-party reviewer and/or manufacturer representative for conformance with the details and specifications. If necessary, percolation test shall be performed to ensure proper installation. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.
ST11. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Dept. - Environmental Services at (408) 615-3080 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter Conditions of Approval PLN22-0635 / 4995 Patrick Henry Drive & 3005 Democracy Way CC Date: November 19, 2024 Page 7
vaults and full trash capture devices is to be done annually by December 31 of each year.
SILICON VALLEY POWER
SVP1. Maximum substation size shall not exceed 225 feet (long) x 120 feet (wide). Final dimensions are to be finalized as part of the detailed design efforts.
SVP2. Maximum substation parcel must be the final building dimensions plus a minimum of the 30 feet set back from the property line.
WATER & SEWER DEPARTMENT
W1. Related Approvals: Applicant shall comply with all related City approvals, entitlements, permits, or requirements associated with the subject property, unless explicitly superseded or revised by the Director of Water and Sewer Utilities.
W2. Separate Services: Applicant shall provide separate water, recycled water, sanitary sewer, and fire services connected to a public main in the public right-of-way services for each parcel to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Services cannot cross a different parcel than the one it serves. No parcel shall be created that requires an easement from an adjacent parcel in order to be served. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.
W3. Easements: Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite.
The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-ofway without overlapping any public utility easement. Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.
ACKNOWLEDGEMENT AND ACCEPTANCE OF CONDITIONS OF APPROVAL Permittee/Property Owner
The undersigned agrees to each condition of approval and acknowledges and hereby agrees to use the project property on the terms and conditions set forth in this permit.
Signature: _________________________________________________ Printed Name: _________________________________________________ Relationship to Property: _________________________________________________ Date: _________________________________________________ Pursuant to Santa Clara City Code 18.128.100, the applicant shall return this document to the Department, properly signed and dated, within 30-days following the date of the Acknowledgement.