DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB

SUBSTATION AGREEMENT

BY AND BETWEEN

THE CITY OF SANTA CLARA, CALIFORNIA
AND
Vantage Data Centers CA31, LLC

PREAMBLE
This Substation Agreement ("Agreement") is made and entered into on the date last signed by the Parties ("Effective Date") by and between the City of Santa Clara, California, a chartered California municipal corporation ("City") and Vantage Data Centers CA31, LLC (a Delaware limited liability company), with its principal place of business located at 2820 Northwestern Parkway Santa Clara, CA 95050 ("Customer"), The City and Customer may be referred to in this Agreement individually as a "Party" or collectively as the "Parties".

RECITALS
A. The City of Santa Clara owns and operates an electric utility, doing business as Silicon Valley Power ("SVP"), and currently provides electric service pursuant to standard electric rate schedules authorized by the City Council of the City of Santa Clara to Customer at 2590 Walsh Avenue, (parcel number 216-28-112), in the City of Santa Clara, California including all services addresses ("Premises"), which is shown on Exhibit A - Parcel Map attached hereto and incorporated into this Agreement by reference;
B. Customer has requested that the City provide 99 MVA of total capacity ("Total Capacity") to meet Customer's anticipated operating needs; C. City has determined that a new single customer electric substation is required to be built to meet Total Capacity. The proposed new substation with a Total Capacity of 99 MVA will be known as the Bowers Avenue Junction (BAJ) and is shown as the area and equipment marked as the Substation Facilities on Exhibit C - Substation Plan attached hereto and incorporated into this Agreement by reference ("Substation Facilities");
D. City has determined that the Substation Facilities as depicted on Exhibit C require new 60kV transmission line extensions ("Transmission Facilities") to connect the Substation Facilities to SVP's electrical system;
E. The Parties acknowledge that significant System Capacity Improvement Facilities as defined in this Agreement will be required to provide the Total Capacity; F. The Parties further acknowledge that improvements required to increase system capacity are not fully within their control and factors outside of the control of either Party may impact the Customer's Available Capacity Schedule outlined in Exhibit E - Available Capacity Schedule attached hereto and incorporated into this Agreement by reference;
G. In addition to significant System Capacity Improvement Facilities, capacity available Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 1 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB to the City's customers is subject to a Transmission Planning Process (TPP) with the California Independent System Operator (CAISO) and this process may affect Available Capacity Schedule;
H. SVP will use commercially reasonable efforts to provide the Customer with capacity according to the Available Capacity Schedule in Exhibit E; I. The Project ( defined below) is subject to capacity operation limits set forth in Exhibit G which the Parties mutually agreed to place on the Premises and other properties as memorialized in Exhibit G1.

J. The purpose of this Agreement is to set forth the mutual obligations of the Parties with respect to supplying Customer with initial interim electric power and then with ongoing capacity and transmission infrastructure for the Premises.

Therefore, in consideration of the foregoing, the Parties agree as follows:

AGREEMENT PROVISIONS
I. DEFINITIONS
A. "Capacity" is the maximum or peak amount of electric power ( electricity) that may be received by Customer for use at a specific point in time and is determined by Transmission System Operating Limits

1. "Available Capacity" is the Capacity depicted in Exhibit E and is the maximum Capacity available to be used by the Customer during each year of each Load Phase.

2. "Available Capacity Schedule" the phased schedule by which the City anticipates Capacity requested by Customer will be available. The Available Capacity Schedule is outlined in Exhibit E.

3. "Interim Capacity" is the Capacity available from SVP's 12 kV distribution feeders prior to operation of the Substation Facilities and as further defined in Section I1.D.

4. "Cumulative Paid Capacity" is the Capacity for which Customer has paid Load Development Fees. Cumulative Paid Capacity is greater than or equal to Available Capacity as set forth in Exhibit E.

5. "Total Capacity" is the Customer requested maximum MVA capacity and cannot exceed 99 MVA. While the Substation Facilities and Transmission Facilities will be designed to meet Total Capacity, the maximum Capacity available to Customer is Available Capacity for each Load Phase.

B. "Electric Service" is defined in SVP Rules and Regulations No. 1 C - Definitions.

C. "Estimated Duration" in Exhibit D - Project Schedule and Costs attached hereto and incorporated into this Agreement by reference is an estimated duration for a set of tasks. This is a best-case scenario and does not include potential delays caused by weather or force majeure events.

D. "Load Development Fee" is the Commercial Facilities Dedicated 60kV Fee Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 2 of 29 ends

DocuS!gn Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB in the City of Santa Clara Municipal Fee Schedule. This fee represents the share of costs associated with System Capacity Improvement Facilities required for the Project. This fee funds systemwide capital expenditures directly related to the addition of infrastructure associated with new load increases and does not include costs directly attributed to the Project.

Customer will be obligated to pay the fee based on the City's Municipal Fee Schedule at the time of the invoice. "Load Phase" is depicted in Exhibit D and represents the periods for which a specific Available Capacity is in effect and available for Customer to use.

E. "Peak Demand" is the sum of the highest average kW delivery, at the Premises, of any 15-minute interval.

F. "Rules and Regulations" means any applicable City and SVP laws, rules, regulations, ordinances, resolutions, and regulations as may be amended from time to time.

G. "System Capacity Improvement Facilities" are the system improvements required by City to support the Total Capacity requested by Customer.

System Capacity Improvement Facilities include projects on SVP's 230kV, 115kV, and 60kV transmission lines, receiving stations, and Pacific Gas & Electric Bulk Electric System Improvements.

H. "Transmission System Operating Limits" mean the maximum allowable Bulk Electric System (BES) operating limits the SVP electric system is capable of operating as determined by the National Electric Reliability Corporation (NERC) Reliability Standards or as otherwise required by Federal Energy Regulatory Commission (FERC);
II. PROJECT OVERVIEW
A. Project Description: The proposed Project (Project), (PLN: 2021-14964) includes the following site improvements on a 6. 7-acre property to construct a 479,022 square foot four-story data center consisting of eight data halls, mechanical penthouse, backup generators, power equipment and office space.

B. Electric Facilities:

1. Customer will fund the development and construction of the Substation Facilities and Transmission Facilities ("Substation Development Phase") to serve the Premises.

2. Customer will construct electrical Substation Facilities with a Total Capacity of 99 megavolt amps (MVA) at 2590 Walsh Ave, on the west side of the Premises near Bowers and Walsh Avenues.

C. Interconnection Facilities:

1. In the course of the development of the Premises, City and Customer will finalize requirements for the interconnection facilities necessary for supplying electrical power to the Project ("Connection Phase").

2. The layout of and requirements for the interconnection facilities shall be complete and agreed upon by the Parties prior to commencement Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 3 of 29 ends

OocuSign Envelope ID: 47733377-083C-4201-8EA6-AA52EA243FCB of any construction on the Substation Facilities.

D. Interim Phase: Customer is also requesting electric power capacity of up to 2500 'r0/A ("Interim Capacity") from SVP prior to operation of the Substation Facilities ("Interim Phase").

E. The beginning and the ends of the Interim Phase and the Substation Development Phase may overlap. The respective responsibilities and obligations of the City and Customer for each of these phases are further described in the following sections.

F. Customer has requested a Total Capacity of 99 MVA. SVP will make commercially reasonable efforts to provide Available Capacity for Customer's use based on Table E1 -Available Capacity Schedule - of Exhibit E.

G. In the event that 99 MVA is not included in Exhibit E, SVP and Customer shall meet at least every two (2) years beginning upon the Effective Date and may mutually agree to amend Table E1 of Exhibit E and, if accepted by City, an Amendment to the Agreement will be executed between the Parties.

Ill. INTERIM PHASE
A. CUSTOMER OBLIGATIONS

1. In order to enable Customer to begin construction and operate without interruption until the Substation Facilities are fully constructed, energized, and operating, Customer shall construct the infrastructure required by SVP in order to use the Interim Capacity of Electric Service ("Interim Service").

2. Customer acknowledges that up to 2500 KVA Interim Service requested for the Premises is included in Total Capacity requested by the Customer and the Total Capacity is the total allocation for the Premises.

3. Customer shall pay all costs associated with the construction and removal of the Interim Service and pay any Load Development Fees associated with the Interim Service.

4. Customer shall work with SVP to transfer Customer's existing load from the Interim Service to the new Substation Facilities within three (3) months after energization of the Substation Facilities.

B. SVP OBLIGATIONS
If Customer meets all requirements of Section A of this Section Ill, SVP will provide Interim Service from 12 kV distribution feeders at or near the location set forth in Exhibit B - Interim Service Diagram attached hereto and incorporated into the Agreement by reference.

IV. SUBSTATION DEVELOPMENT PHASE
The following activities and obligations shall constitute the Substation Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 4 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-M52EA243FCB Development Phase ("Substation Development Phase"):

A. SUBSTATION DEVELOPMENT SCHEDULE:

Customer shall provide a proposed project schedule to SVP that is aligned with the Schedule in Exhibit D for review and approval by SVP. Each Party shall notify the other Party as soon as practicable when the schedule is anticipated to change.

B. SVP OBLIGATIONS

1. SVP will provide up to the Available Capacity indicated in MVA to the Premises as further detailed in Exhibit E, after successful energization of the Substation Facilities, Transmission Facilities and System Capacity Improvement Facilities.
a) Because the System Capacity Improvement Facilities
completion schedules are not fully controlled by SVP, SVP, at its sole discretion, may limit Customer and their tenant's Available Capacity until the capacity is made fully available to SVP.
b) The approved Available Capacity for each Load Phase is identified in Exhibit E. Exhibit E may only be modified subject to the provisions of Section VI.F. (Capacity Reduction) of the Agreement or through an Amendment to the Agreement
executed between the Parties.
c) The Parties agree that the capacity from Substation Facilities will be provided pursuant to the Rules and Regulations, applicable Silicon Valley Power Rate Schedules, current Load Development Fees, and subject to the completion of any
system upgrades necessary to serve the load at the time the load capacity increase is initiated.

2. SVP will make Electric Service available to the Customer, at the Utility Connection Point, from the Substation Facilities and connected to the Premises through the Transmission Facilities. The Utility Connection Point for a SVP junction facility is the Customer side of the 60kV disconnect switches located within the Substation Facilities as shown in Exhibit C.

3. SVP will use commercially reasonable efforts to test and commission the Substation Facilities within thirty (30) months after the Effective Date of this Agreement.

4. SVP shall use commercially reasonable efforts to design, construct, test and commission the Transmission Facilities within thirty (30) months after the Effective Date of this Agreement.

5. Completion of the Substation Facilities and Transmission Facilities is subject to the following additional terms:
a) SVP will own, operate, and maintain all City-owned Substation Facilities and Transmission Facilities, to the Utility Connection Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 5 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB Point.
b) SVP will own, operate and maintain all City-owned Substation Facilities and Transmission Facilities, SVP control building and all equipment therein, as shown in Exhibit C.
c) The Parties agree to coordinate the design and construction of the Substation Facilities and Transmission Facilities to assure timely completion in accordance with Exhibit D.
d) SVP will design the City-owned control building within the Substation Facilities.
e) SVP will keep Customer informed on an ongoing basis as to the costs it is incurring associated with the design,
construction, testing, commissioning, and completion of the Substation Facilities and Transmission Facilities, including periodic updates to Exhibit D as needed. Once preliminary engineering review is complete, SVP will provide Customer with a detailed estimate of SVP project cost to fully complete the control building with the Substation Facilities. SVP will provide Customer with reasonable access to SVP's records that substantiate any costs SVP proposes to bill to Customer related to the Substation Facilities and Transmission Facilities. f) In no way will City be held responsible or subject to any penalty if System Capacity Improvement Facilities are not complete by Customer's anticipated or proposed energization date.
g) The Substation Facilities shall be Substantially Complete before SVP begins testing and commissioning activities. For purposes of this Agreement, "Substantially Complete" means that Substation Facilities construction is complete as
determined by SVP, in accordance with SVP's standards and requirements, and no Customer contractors remain working within the perimeter wall of the Substation Facilities. Location of Substation Perimeter Wall (as defined below) is as specified in Exhibit C. SVP is not obligated to compress its testing and commissioning schedule to meet Customer's anticipated
service date.
h) SVP acknowledges that the required interconnection study has been completed and reflects Available Capacity known at that time. SVP will update the Customer on projects and schedules that may impact the Available Capacity feasibility as that information becomes available.

C. CUSTOMER OBLIGATIONS

1. Customer must pay a Load Development Fee according to the current applicable fee set forth in the City of Santa Clara Municipal Fee Schedule and in the timelines in Exhibit D.

2. Customer shall design (with the exception of the City-owned control building), procure, and construct Substation Facilities (including Substation Agreement with Vantage Data Centers CA31, LLC Page 6 of 29 Rev 2/1/2022
DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB control building), as shown in Exhibit C, to provide 60kV service to the Premises. Customer shall perform design, procurement, and construction pursuant to SVP's standards and requirements, at Customer's own financial risk.

3. The Substation Facilities would consist of two 100 MVA transformers.

In the event one transformer fails, then the load, not to exceed 99 MVA, would be transferred to the redundant transformer.

4. Completion of the Substation Facilities and Transmission Facilities is subject to the following additional terms:
a) The Substation Facilities shall be for the exclusive use of the Project to be constructed on the Premises.
b) Substation Facilities 60kV bus will be a breaker and half scheme with the complete 60kV junction being constructed to serve the Premises.
c) Customer shall obtain any necessary land use entitlements, and provide any property rights, including easements, to the City, necessary to construct, complete and maintain the Substation Facilities.
d) Customer shall be responsible for all costs associated with the acquisition of any additional easements necessary for the Transmission Facilities.
e) SVP and Customer shall negotiate and execute one or more easement agreements providing easements on the Premises, as may be required by SVP, to install, operate, and maintain any necessary distribution facilities.
f) Customer shall provide documents required to transfer any Substation Facility-related equipment to City such as, but not limited to bill of sale in a form acceptable to City.
g) Customer shall construct a Substation Perimeter Wall, marked as "Perimeter Wall" on Exhibit C, which shall create a physical boundary around the Substation Facilities for ensuring the Substation Facilities' security ("Substation Perimeter Wall").

The Substation Perimeter Wall shall be for SVP's exclusive use. Only SVP approved signage is permitted on the
Substation Perimeter Wall. The Substation Facilities shall have an all-weather asphalt surface underlain by an aggregate base.
h) The Customer shall procure the Substation Facilities control building to comply with SVP's standards and requirements.

Any changes or substitutions to SVP's design package for the control building must have SVP approval prior to
implementation. SVP, or SVP's designated representative, shall oversee factory acceptance testing of the control building and inspect the control building prior to shipment of the building to the Premises. All deficiencies identified by SVP during any factory inspection visits or factory acceptance Substation Agreement with Vantage Data Centers CA31, LLC Page 7 of 29 Rev 2/1/2022
DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB testing shall be corrected prior to shipment of the control building to the Premises.
i) Customer-owned control, communication, and protection wiring from the Customer's control building to the marshalling termination cabinet located on Customer side of demarcation fence, and related equipment, will be owned and maintained by Customer. Customer shall clearly label and identify all control and protection wiring as required by SVP to avoid (1) confusion during troubleshooting, maintenance, or repair of City-owned equipment and (2) misoperation of any SVP
equipment.
j) Customer shall pay the City estimated and actual costs pursuant to Payment Milestones set forth in Exhibit D. These costs shall include but not be limited to all travel expenses incurred by SVP to (1) perform factory acceptance testing, (2) oversee testing for any equipment purchased by Customer to be turned over for SVP's ownership, and (3) perform all punch list items necessary to fully integrate the Substation Facilities into SVP's network. Payments to City shall be due within thirty (30) days of the date of invoice from City. Invoices from City shall describe the basis of estimated or actual costs to Customer.
k) Standards of Care: Customer shall ensure that its contractors perform the construction of the Substation Facilities and other facilities to be transferred to SVP in a skillful and competent manner, consistent with the standards generally recognized as being employed by professionals in the same discipline in the State of California and that contractors maintain all required all licenses, permits, qualifications, insurance and approvals.

Customer shall further ensure that these contractors maintain expertise in the professional calling necessary to the
construction of the Substation Facilities and other facilities to be transferred to SVP.

I) Warranty: By delivery of the Substation Facilities to be transferred to SVP, Customer expressly warrants that the Substation Facilities to be transferred to SVP shall be fit for the purpose intended, be free from defect, conform to the to the standards and requirements specified by SVP, and comply with all applicable federal, state and local laws. Customer shall cause its contractor to promptly replace or correct any incomplete, inaccurate, or defective materials or services at no cost to City when the Substation Facilities fail to conform with the foregoing. If Customer fails to promptly correct or replace materials or services, City may make corrections or replace materials or services and charge Contractor for the cost Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 8 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB incurred by City.

V. CONNECTION PHASE
The following activities and obligations shall constitute the Connection Phase:

A. SVP OBLIGATIONS

1. Upon completion of the Substation Facilities, Transmission Facilities and System Capacity Improvement Facilities, SVP shall provide the Available Capacity (inclusive of any Interim Service that is transferred to the Substation Facilities) for each Load Phase as detailed in Exhibit E. Such capacity shall include primary and, as necessary, secondary, services to the Premises.

2. All electrical equipment, installed by Customer upon the Premises for the purpose of, but not limited to, delivery and metering of Customer's Electric Service, shall become the property of SVP. SVP shall own, operate, and maintain the Substation Facilities (including the City-owned control building and all other City-owned equipment) and the Transmission Facilities at SVP's sole cost and expense, in accordance with good utility practices and Rules and Regulations.

B. CUSTOMER OBLIGATIONS

1. Customer shall work with SVP to transfer Customer's existing load from any temporary power such as temporary construction power, or other Interim Service to the new Substation Facilities within three (3) months after energization of the Substation Facilities.

VI. LOAD FORECAST AND LOAD DEVELOPMENT FEE PAYMENT SCHEDULE A. During Interim Service and after Substation Facilities are energized, Customer is permitted to use Available Capacity based on Exhibit E as it may be amended pursuant to this Section.

B. City will invoice Load Development Fees based on the following schedule:

1. Following the Effective Date, City will invoice Customer for Load Development Fees based on 20 MVA. This amount will be reduced by the dollar amount of Load Development Fees paid for Interim Service.

2. Each time that Available Capacity exceeds Cumulative Paid Capacity in Exhibit E, City will invoice Load Development Fees in 10 MVA increments based on the fee in the municipal fee schedule at the time of invoice.

C. SVP may request, and the Customer shall provide, a 10-Year load forecast by month within thirty (30) days of SVP's request in a form required by SVP.

SVP may make such request up to twice per year. This forecast will be used to determine applicable capacity available for use and incorporated into SVP's TPP with CAISO. This 10-Year load forecast (which may also be referred to as load ramp schedule) is for transmission planning purposes only and does not amend Exhibit E. Exhibit E may only be modified by amendment to this Agreement or pursuant to subsection F of this Section Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 9 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-BEA6-M52EA243FCB VI.

D. SVP will evaluate Customer's load forecast and determine applicable capacity available for use and incorporated into SVP's TPP with CAISO.

SVP may adjust load forecast to meet SVP's system capacity requirements.

E. Customer shall be responsible for operating within the Available Capacity for each Load Phase in Exhibit E. In the event that Available Capacity for a Load Phase is exceeded, the Customer shall pay any penalties, damages, or any other cost associated with Customer's load exceeding Available Capacity. Such costs include, but are not limited to, (1) costs of the de­ energization of SVP electric system for asset inspection; and (2) any penalties assessed to SVP by CAISO relating to resource adequacy forecasted capacity based on the Customer's excess load above Available Capacity for that Load Phase identified in Exhibit E.

F. Capacity Reduction:

1. SVP will monitor Peak Demand at the end of each Load Phase and annually after the last phase depicted in Exhibit E.

2. After the end of each Load Phase, City, in its sole discretion, may reduce the Available Capacity and Cumulative Paid Capacity based on Peak Demand during the last completed phase (Reduced Available Capacity).

3. During the Load Phases defined in Exhibit E, average Peak Demand is calculated as the highest demand average over three (3) consecutive monthly billing periods (Average Peak Demand) for each year during that Load Phase.

4. In the event that Available Capacity in a Load Phase is 15% or more greater than Average Peak Demand, SVP may take action to reduce Available Capacity and unilaterally amend Exhibit E ("Capacity Reduction").

5. SVP shall notify the Customer of any Capacity Reduction by means of a Capacity Reduction Notice in substantially the same format as Exhibit F - Sample Capacity Reduction Notice attached hereto and incorporated into this Agreement by reference. Such notice will include an updated Exhibit E and, through that notice, Exhibit E will be effectively amended and incorporated into the Agreement.

6. In the event that SVP issues a Capacity Reduction Notice which includes capacity for which Customer has paid Load Development Fees, SVP will refund the amounts Customer paid for the amount of available capacity that has been reduced unless such capacity is included in a future Load Phase. Customer shall have no right to any interest accrued by the entire payment or any amount refunded.

7. If the Cumulative Paid Capacity has been subject to a Capacity Reduction at any time during the term of the Agreement and, if the Customer's demand is expected to increase above the reduced Available Capacity, then the Customer may request an amendment to the Agreement to amend Exhibit E. Customer shall provide any supporting information requested by SVP and, if acceptable to City, Substation Agreement with Vantage Data Centers CA31, LLC Page 10 of29 Rev 2/1/2022
OocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB the Parties will execute an Amendment to the Agreement modifying Exhibit E.

8. After Final Load Phase, SVP may continue to evaluate the highest demand average over (3) three consecutive monthly billing periods during a five-year window beginning with end date of the final phase of the currently effective Available Capacity Schedule. SVP may issue Capacity Reduction Notices at any time that the Available Capacity in the Final Load Phase is 15% greater than Average Peak Demand.

G. When evaluating Customer Peak Demand, SVP may evaluate any anomalies such as needle peaks that may artificially increase peak demand and, at SVP's sole discretion, such anomalies may be excluded from the calculation of Average Peak Demand.

H. Customer shall provide at least 14-day advance notice of any maintenance or commissioning activities.

VII. NON-INTERFERENCE
Neither Party nor any of its agents or contractors shall perform any work relating to the Interim Service, the Substation Facilities, the Transmission Facilities, or the Premises in a manner which unreasonably interferes with the other Party's work or property. Customer and each of its respective agents and contractors shall use their best efforts to minimize disruption to the City. Without limiting the generality of the foregoing, each party shall consult in good faith with the other regarding the manner in which work will be performed.

VIII. FORCE MAJEURE
A. Notwithstanding anything to the contrary in this Agreement, neither Party shall be considered to be in default in performance of any of its obligations under this Agreement when a failure of performance is due to a Force Majeure event.

B. For the purpose of this Agreement, "Force Majeure" is defined as any cause beyond the reasonable control of the Party affected, and which by exercise of reasonable due diligence such Party could not reasonably have been expected to avoid and which by exercise of due diligence it has been unable to overcome or obtain or cause to be obtained a commercially reasonable substitute therefore.

C. Force Majeure includes failure or threat of failure of facilities, Acts of God, flood, drought, earthquake, storm, tornado, fire, explosion, lightning, epidemic, public emergency, war, riot, civil disobedience, labor strike, labor dispute, labor or materials shortage (however labor or materials shortage does not include the mere inability to obtain that labor or material at a particular price), sabotage, restraint by court order, restraint by public authority, or action or non-action by governmental authority or accident), which by the exercise of due diligence such Party could not reasonably have been expected to avoid and which by exercise of due diligence has been unable to overcome.

D. Notwithstanding Section VIII.C, a Force Majeure does not include (a) any cost and expense increase; (b) any strike or lockout or other labor-related disturbance involving only the employees of Customer or its contractors and Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 11 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB which is not part of a nationwide strike, (c) typical weather or climatic conditions, including precipitation (including rain and snow), heat or wind conditions as would be expected for the geographic area of the Premises, (d) unavailability of labor, equipment, material or other resources (e) economic hardship of any Party; (f) machinery or equipment breakdown due to inadequate maintenance, (g) price fluctuations with respect to labor or materials, supplies or components of equipment related to items to be supplied by Contractor under this Agreement; and (h) the application of laws and/or implementation of health and safety guidelines, whether legally mandated or merely recommended, that exist on the Effective Date and relate to the Coronavirus pandemic, including laws or guidelines regarding wearing of protective masks, social distancing, on-site COVID testing or other related medical screening, rental of additional portable restrooms and/or additional trailers to promote social distancing, additional cleaning and disinfection, procurement of hand sanitizer, masks, air filters, thermometers and signage, and management and oversight of the foregoing.

E. The Party claiming that a Force Majeure event has occurred shall notify the other Party in writing within thirty (30) days from the date that such Party knew of the event or circumstance giving rise to the claim. Such notice shall fully describe the claimed Force Majeure event, and outline the affected Party's efforts to prevent, avoid, overcome, delay or mitigate such Force Majeure event and the impacts on its performance hereunder, as well as the anticipated duration of such delay. The affected Party shall keep the other Party informed, in writing, on a regular basis during the pendency of the Force Majeure event to any updated information regarding such anticipated duration.

IX. ASSIGNMENT OF AGREEMENT/SUCCESSORS IN INTEREST
A. Customer and City bind themselves, their successors, and assigns, to all covenants of this Agreement. Except as otherwise set forth in this Agreement, no interest in this Agreement or any of the work provided for under this Agreement shall be assigned or transferred, either voluntarily or by operation of law, by either Party without the prior written approval of the other Party, which approval shall not be unreasonably withheld, conditioned, or delayed; any such assignment shall not relieve the assignor from any of its obligations under this Agreement.

B. Customer shall be as fully responsible to City for the acts and omissions of its subcontractors, and of persons either directly or indirectly employed by them, as Customer is for the acts and omissions of persons directly employed by it.

X. NO THIRD PARTY BENEFICIARY
Except permitted assignees subject to Section IX, this Agreement shall not be construed to be an agreement for the benefit of any third party or parties and no third party or parties shall have any claim or right of action under this Agreement for any cause whatsoever.

Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 12 ends

DocuSign Envelope ID: 47733377 -0B3C-420 1-8EA6-AA 52EA243FCB XI. HOLD HARMLESS/INDEMNIFICATION
A. To the extent permitted by law, Customer agrees to protect, defend, hold harmless and indemnify City, its City Council, commissions , officers , employees, volunteers and agents from and against any claim, injury, liability, loss, cost, and/or expense or damage, including all costs and attorney's fees in providing a defense to any such claim or other action, and whether sounding in law, contract, tort, or equity, in any manner arising from, or alleged to arise in whole or in part from, or in any way connected with this Agreement - including claims of any kind by Customer's employees or persons contracting with Contractor to perform any portion of this Agreement- and shall expressly include passive or active negligence by City connected with the Agreement.

However, the obligation to indemnify shall not apply if such liability is ultimately adjudicated to have arisen through the sole active negligence or sole willful misconduct of City; the obligation to defend is not similarly limited.

B. Customer's obligation to protect, defend, indemnify, and hold harmless in full City and City's employees, shall specifically extend to any and all employment-related claims of any type brought by employees , contractors, subcontractors or other agents of Customer , against City (either alone , or jointly with Customer), regardless of venue/jurisdiction in which the claim is brought and the manner of relief sought.

XII. AMENDMENTS
It is mutually understood and agreed that no alteration or variation of the terms of this Agreement shall be valid unless made in writing and signed by the Parties and incorporated as an Amendment to this Agreement.

XIII. SEVERABILITY CLAUSE
In case any one or more of the provisions contained herein shall be held invalid, illegal or unenforceable by a court of competent jurisdiction , it shall not affect the validity of the other provisions which shall remain in full force and effect.

XIV. WAIVER
Waiver by either Party of any provision of this Agreement shall not be construed as waiver(s) of any other provision of this Agreement. This specifically includes active or passive waiver of actions after Available Capacity for a specific phase is exceeded.

XV. NOTICES
All notices to the Parties shall, unless otherwise requested in writing, be sent to City addressed as follows:

Chief Electric Utility Officer
City of Santa Clara
1500 Warburton Avenue
Santa Clara, California 95050
And by e-mail at svpcontracts@santaclaraca .gov, and
[email protected]
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 13 of 29 ends

DocuSign Envelope ID: 47733377 -083C -4201- 8EA6-AA52EA2 43FCB And to Customer addressed as follows:

Vantage Data Centers CA31, LLC
2820 Northwestern Parkway
Santa Clara, CA 95051
Attention: General Counsel
Email: [email protected]
The workday the e-mail was sent shall control the date notice was deemed given.

An e-mail transmitted after 1 :00 p.m. Pacific Standard Time on a Friday shall be deemed to have been transmitted on the following business day.

XVI. CAPTIONS
The captions of the various sections, paragraphs and subparagraphs of this Agreement are for convenience only and shall not be considered or referred to in resolving questions of interpretation.

XVII. GOVERNING LAW AND VENUE
This Agreement shall be governed and construed in accordance with the statutes and laws of the State of California. The venue of any suit filed by either Party shall be vested in the state courts of the County of Santa Clara, or if appropriate , in the United States District Court, Northern District of California, San Jose, California.

XVIII. COMPLIANCE WITH LAWS
Customer shall at its own cost and expense comply with all statutes, ordinances , regulations and requirements of all governmental entities, including federal, state, county or municipal , whether now in force or hereinafter enacted, including but not limited to "The Code of the City of Santa Clara, California" ("SCCC"). In particular, Customer's attention is called to the regulations regarding Campaign Contributions (SCCC Chapter 2.130), Lobbying (SCCC Chapter 2.155), Minimum Wage (SCCC Chapter 3.20), Business Tax Certificate (SCCC section 3.40.060), and Food and Beverage Service Worker Retention (SCCC Chapter 9.60), as such Chapters or Sections may be amended from time to time or renumbered. Additionally , Customer has read and agrees to comply with City's Ethical Standards (http://santaclaraca.gov/home/showdocument?id =58299).

XIX. DISPUTE RESOLUTION
A. Unless otherwise mutually agreed to by the Parties, any controversies between the Parties regarding the construction or application of this Agreement , and claims arising out of this Agreement or its breach, shall be submitted to mediation within thirty (30) days of the written request of one Party after the service of that request on the other Party.

B. The Parties may agree on one mediator. If they cannot agree on one mediator, the Party demanding mediation shall request the Superior Court of Santa Clara County to appoint a mediator. The mediation meeting shall not exceed one day (eight (8) hours). The Parties may agree to extend the time allowed for mediation under this Agreement
C. The costs of mediation shall be borne by the Parties equally.

Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 14 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB D. Mediation under this section is a condition precedent to filing an action in any court. In the event of litigation or mediation that arises out of any dispute related to this Agreement, the Parties shall each pay their respective attorney's fees, expert witness costs and cost of suit, regardless of the outcome of the litigation.

XX. OTHER AGREEMENTS
This Agreement shall not prevent either Party from entering into similar agreements with other entities or individuals.

XXI. TERMINATION
A. Termination for Cause

1. For purposes of this Agreement, the term "default" shall mean the failure of any Party to perform any material obligation in the time and manner provided by this Agreement.

2. Either Party may terminate this Agreement in the event of a default by the other Party by providing a written Notice of Termination to the defaulting Party. Such Notice of Termination shall become effective no less than thirty (30) calendar days after a Party receives such notice. Such Notice of Termination for cause shall include a statement by the terminating Party setting forth grounds for determination of default under the Agreement.

3. Opportunity to Cure Default: Upon receipt of a Notice of Termination by a Party arising from its default under this Agreement, the defaulting Party shall have thirty (30) days from the receipt of such notice to cure the default by making such payment or performing the required obligation (or additional time, if any that is reasonably necessary to promptly and diligently cure the default). If the default is cured to the reasonable, mutual satisfaction of the Parties, the Agreement shall remain in effect upon written acceptance of the cure by the Party who issued the Notice of Termination for cause.

B. Termination without Cause
At any time, Customer may elect to terminate construction of the Substation Facilities upon delivery of (180) days written notice thereof to the City. If Customer chooses to terminate construction of the Substation Facilities and Transmission Facilities, Customer will reimburse any and all City expenses, termination fees, and cancellation fees reasonably incurred by the City related to the Substation Facilities and Transmission Facilities prior to the expiration of such 180-day notice period. Customer shall not be entitled to a refund of any Load Development Fees.

XXII. COUNTERPARTS
This Agreement may be executed in counterparts, each of which shall be deemed to be an original, but both of which shall constitute one and the same instrument.

XXIII. INTEGRATED DOCUMENT-TOTALITY OF AGREEMENT
This Agreement and its Exhibits embody the entire agreement between the Parties Substation Agreement with Vantage Data Centers CA31, LLC Page 15 of 29 Rev 2/1/2022
DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA 52EA243FCB regarding the subject matter of this Agreement. In the event of a conflict between the terms of the Agreement and the Exhibits, the terms of the Agreement shall control. No other understanding, agreements , conversations , or otherwise , with any officer, agent, or employee of the City shall affect or modify any of the terms in or obligations created by this Agreement.

The Parties acknowledge and accept the terms and conditions of this Agreement as evidenced by the following signatures of their duly authorized representatives . It is the intent of the Parties that this Agreement shall become operative on the Effective Date.

CITY OF SANTA CLARA , CALIFORNIA
a chartered California municipal corporation
Approved as to Form: • Dated: / {) /;3 k)dd)>--
D . 1 B 11 . Digitally signed by Daniel Ballin
ante a 1n Date:2022.10.1210:33:13
-07'00'
Office of the City Attorney
City of Santa Clara
.s3j, ev Batra - City M ger
15'00 Warburton Aven e
Santa Clara, CA 95050
Telephone: ( 408) 615-2210
Fax (408) 241-6771
"CITY"
VANTAGE DATA CENTERS CA31, LLC
os a Delaware lim~t: .. d liability company
Dated: IADocuSigned by: 8, 2022_
By (Signature): L Mt~ - - ---------
N
3ED3486536FB443 ... - - --- ---- ----
ame: Jerrery I encn
Title: President
Principal Place of
Business Address: 2820 Northwestern Parkway
Email Address : [email protected]
Telephone : (303) 562-6744
"CUSTOMER"

EXHIBIT A
Parcel Map
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 16 of 29 ends

DocuS!gn Envelope ID: 47733377-0B3C-4201-8EA6-M52EA243FCB COUNT'!' ASSESSOR s A N TA
CENlRAL
P:M. 256-M·S
CSMT.
\
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

CALIFORNIA

EXPRESSWAY
P.M.314-M-29

CONOENSA

Page 17 of 29 ends

DocuS ign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB

EXHIBIT B
Interim Service Diagram
7',<JO WAl SH
2500
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022
I
MH
V173 . · ,
vs 2 217 ';., .-

Page 18 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB Demarcation
Fence

EXHIBIT C
Substation Plan
Perimete r Wall

EXHIBIT D
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022
Tran:em.is!;'ion FRcihtie,
l!,PO'M'\,
OR,~ MLI
\','' IT l!l'f
e e•.rAC

Page 19 of 29 ends

OocuSign Envelope ID: 47733377-083C-4201-8EA6-M52EA243FCB Project Schedule and Costs
I. PAYMENT RATES
A. Customer shall pay the Load Development Fee according to the schedule in Table D1 based on the Load Development Fee at the time of payment in the City of Santa Clara Municipal Fee Schedule adopted by the City Council of the City of Santa Clara as amended from time to time.

B. In addition to any costs paid to directly to third parties by Customer for construction and other Customer responsibilities under this Agreement, Customer shall also be responsible for actual costs for Substation Facilities and Transmission Facilities including, but not limited to actual City costs for any associated work, services, or materials.

II. PAYMENT SCHEDULE
A. City will invoice Customer based on the milestone schedule on Table D1.

Payment is due within 30 days of Invoice Date.

B. All Estimated Amounts are based on fees at the time of this Agreement.

Actual Amounts will be based on fees at the time of invoice.

Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 20 of 29 ends

DocuSign Envelope ID; 47733377-083C-4201-8EA6-AA52EA243FCB Table D1 - Pavment Milestone Schedule
Payment City Invoice Date Estimated
Milestone (PM) Amount of Invoice
PM 1 City will issue an invoice within 30 Days of the Effective $8,162,026 Date of this Agreement.

City will invoice Load Development Fees for the difference between 20 MVA and the # of MVA as already paid for
Interim Service.

PM2 City will issue an invoice 30 Days before Public Works $2,708,879 contract is submitted to Council for approval.

PM 3 After energization of Substation Facilities, City will invoice $TBD Customer for the difference between estimated costs billed in PM 1 and PM 2 and actual costs.

PM4 Phase O: Load Development Fee; City will invoice $ 6,979,800 Customer according to the provisions of Section VI of the Agreement no sooner than 3 years following energization of Substation Facilities.

PM 5 Phase 1: Load Development Fee; City will invoice $6,979,800 Customer according to the provisions of Section VI of the Agreement no sooner than 4 years following energization of Substation Facilities.

Ill. PROJECT SCHEDULE & ESTIMATED COSTS
Table D2 sets forth (1) the design and construction activities associated with the Substation Facilities and Transmission Facilities; and (2) associated schedule and payment estimates. Tasks and activities in this schedule may overlap and Estimated Duration is a best-case scenario estimate.

Table D2 - Substation Facilities and Transmission Line Design and Construction Elements
Task/ Activity Estimated Estimated Payment Comments
Duration Amount to be Milestone
oaid to SVP

1. Substation Facilities design 4 months $113,181.00 PM 1 Customer also pays

2. Transmission Facilities design Interim Load Development Fee

3. Control Building Procurement 6 months $ 115,260.00 PM 1 Concurrent with Drawings preparation of Substation

4. Preparation of Public Works Facilities and
Construction Specification Transmission Facilities
Documents drawinas

5. Substation Facilities Construction 8 months $41,500.00 PM2 Construction costs paid Sunnort directlv bv Customer

6. Substation Facilities Commissioning 4 months $ 524,379.00 PM2 Begins after Substation and Testing Facilities construction is
comolete.

Transmission Facilities Interconnection Process (Estimated Duration 26 months) includes tasks associated with #7 - #14 below. This process will occur concurrent with Substation Facilities design, construction, commissioning, and testing
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 21 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB Task/ Activity Estimated Estimated
Duration Amount to be
oaid to SVP

7. Transmission Facilities Line 3 months $88,785.00
Consultant

8. Transmission Line Interconnection 6 months $ 75,000.00 Desian (Concurrent with #9)

9. Steel Transmission Facilities Pole 12 months $ 790,000.00 and Materials Procurement
(Concurrent with #8)

10. Public Works Construction Bid 8 months $5,000.00
process for Transmission Facilities
line construction

11. Transmission Facilities line 3 months $1,088,000.00 construction associated with
connecting the Substation Facilities
to the SVP 60kV loop

12. Work necessary at adjacent stations
for relay panel replacement or
upgrades necessary for the new
interconnection

13. Transmission Facilities Line 6 months $210,000.00
interconnection (Citv Labor)

14. Miscellaneous costs may include, but $ 840,000.00
are not limited to
• Encroachment permits from City of
Santa Clara, Santa Clara County, and
Santa Clara Valley Water District;
• Utility relocation work;
• Soil remediation or disposal of
hazardous materials not previously
identified;
• Stormwater Pollution Prevention Plan
(SWPPP) permit fees,
• in lieu transfer to City of Santa Clara
General Fund
City will invoice Customer (and TBD
Customer shall pay) the difference
between estimated and actual costs
TOTAL ESTIMATED DURATION AND 30 $3,891,105

COSTS MONTHS
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022
Payment Comments
Milestone
PM 1
PM 1
PM 1
PM 2
PM 2 This Task/ Activity does
not include any work
associated with capacity
increases on the loop.

PM2
PM 2
PM3
Estimated duration
includes net duration
with schedule overlaps
included. Schedule
assumes best case
scenario (Transmission
Facilities
Interconnection
Process) and no delays
due to Force Maieure

Page 22 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-BEA6-AA52EA243FCB IV. LOAD DEVELOPMENT FEE (LDF) PAYMENT SCHEDULE
Total Capacity Anticipated (99 MVA)
All Estimated Amounts are based on fees at the time of this Agreement.

Actual Amounts will be based on fees at the time of invoice.

Load Phase Timeline Estimated Payment Comments
amount to be Milestone
oaid to SVP
Interim Service - 2.5 MVA Within 30 days of the $6,979,800 PM 1 LDF $348.99 + 17.5 MVA (1 st LDF Effective Date of this
oavmentl Aareement
Phase O -20 MVA No sooner than 3 years $6,979,800 PM4
after energization of
Substation Facilities
Phase 1-20 MVA* No sooner than 4 years $6,979,800 PMS
after energization of
Substation Facilities
ESTIMATED TOTAL $ 20,939,400

LOAD DEVELOPMENT
FEES
*Togo above 52.2 MVA at this location, additional loop configuration or an additional loop may be required and may delay ramp increase.

V. ESTIMATED TOTAL PROJECT COSTS TO BE PAID TO SVP
All costs are estimates based on current rates and fees at the time of execution of this Agreement. Actual costs will be based on rates at the time of activity and fees at the time of payment.

A. Substation/Transmission Line Design and Construction Costs: $3,891,105 B. Load Development Fees: $ 20,939,400
C. Grand Total: $ 24,330,505
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 23 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB

EXHIBIT E

AVAILABLE CAPACITY SCHEDULE
I. SVP will make commercially reasonable efforts to provide Available Capacity for Customer's use based on the timeline shown in Table E1 ("Available Capacity Schedule").

II. The start date of the Available Capacity Schedule is the July 1st following the energization of the Substation Facilities ("Capacity Start Date"). Where load development fees are due pursuant to Table E1, City will invoice customer for Load Development Fee Payment after July 1 of the applicable year.

Ill. The Phase Start Date for each phase assumes Customer has paid all amounts due including, but not limited to, Load Development Fees and charges included in Exhibit D before the start of that Phase.

IV. Table E1 - Available Capacity Schedule is subject to the provisions of Section VI.F. (Capacity Reduction) of the Agreement.

Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 24 of 29 ends

OocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB Table E1 -Available Capacity Schedule
Capacity for Cumulative
Paid
Load Phase Start Phase End Available Load Capacity Year Capacity Development Phase Date Date (Max 99 (MVA) Fee Payment MVA) (MVA) 3 months
Interim Interim Service after 2022
Service Facilities substation to 2.5 MVA 20MVA 20 MVA
complete facilities 2023
energized
3 years after 2024 3.0 MVA 0MVA 20MVA
Substation energization
0 Facilities of Substation 2025 18MVA 0MVA 20 MVA
Energized Facilities
Date 2026 32MVA 20MVA 40MVA
Date Substation 2027 52.2 MVA* 20 MVA 60MVA
Facilities 3 years after 52.2 MVA* 60MVA 1 Phase 1 Start 2028 0MVA Energized +3 Date years 2029 52.2 MVA* 0MVA 60MVA Date Substation 2030 52.2 MVA* 0MVA 60MVA
Facilities 3 years after 52.2 MVA* 60 MVA 2 Phase 2 Start 2031 0MVA Energized +6 Date years 2032 52.2 MVA* 0MVA 60 MVA Date Substation 2033 52.2 MVA* 0MVA 60MVA
Facilities 2 years after 52.2 MVA* 60 MVA 3 Phase 3 Start 2034 0MVA Energized +8 Date years *Togo above 52.2 MVA at this location, additional loop configuration or an additional loop may be required and may delay ramp increase.

Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 25 of 29 ends

DocuSign Envelope ID: 47733377 -0B3C-4201-8EA6-AA52EA243FCB

EXHIBIT F
Sample Capacity Reduction Notice
This Capacity Reduction Notice is made pursuant to the [INSERT SUBSTATION NAME] Substation Agreement (the "Agreement"), between the City of Santa Clara, California, a chartered California municipal corporation ("City") and [INSERT NAME OF ENTITY], [INSERT TYPE OF ENTITY] ("Customer") dated _ _ ___ , 20_.

This Capacity Reduction Notice is governed by the provisions of the Agreement , and this Capacity Reduction Notice is incorporated into that Agreement.

Customer is hereby notified that the Available Capacity Schedule (Exhibit E - Available Capacity Schedule) of the Agreement has been modified according to the below calculations:

Capacity Reduction Calculation pursuant o Phase#
PHASE]
[INSERT SUBJECT
Available Capacity for year: _ __ has been modified based on the following calculation:

1. Peak Demand for [INSERT FIRST CONSECUTIVE MONTH], 20_ during evaluation period [INSERT PHASE OR YEAR STATED IN STEP
1]: ___ _ MVA

2. Peak Demand for [INSERT SECOND CONSECUTIVE MONTH], 20_ during evaluation period [INSERT PHASE OR YEAR STATED IN STEP
1]: _ _ _ _____ MVA

3. Peak Demand for [INSERT THIRD CONSECUTIVE MONTH], 20_ during evaluation period [INSERT PHASE OR YEAR STATED IN STEP
1]: ___ ____ _ MVA

4. Average Peak Demand of three consecutive monthly billing periods: [INSERT AVERAGE OF STEPS 1, 2, AND 3] MVA

5. If Available Capacity is 15% or greater than Average Peak Demand : [INSERT MVA FROM STEP 5 MULTIPLIED BY 1.15] MVA
Based on the above reduction calculation, Table E1-Available Capacity Schedule in Exhibit E of the Agreement has been modified. This Capacity Reduction Notice is effective 30 days from the date signed by the SVP official below.

The new Available Capacity for each Load Phase of Agreement is as shown on Exhibit E -AVAILABLE CAPACITY SCHEDULE -AMENDED [ENTER DATE OF NOTICE+ 30 Days] attached and incorporated into the Agreement by reference. Such Exhibit E shall supersede any previous Exhibit E whether those Exhibits were modified by amendment to the Agreement or by Capacity Reduction Notice.

By:

Name: ---- - -------
Tit I e: Chief Electric Utility Officer
Signature: ___________ _ _
Date: - --- -------
Substation Agreement with Vantage Data Centers CA31 , LLC Rev 2/1/2022

Page 26 of 29 ends

DocuS[gn Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB

EXHIBITG
Exhibit G1
Vantage Portfolio Operating Limit
Table G-1 -Available Capacity Schedule for Vantage Properties Vantage Portfolio Capacity Operation Limits for the following Vantage Properties per the Letter from Manuel Pineda to Sam Huckaby, dated 9/24/2020 and attached as Exhibit G2:
• 2820 Northwestern
• 2897 Northwestern
• 737 Mathew
• 2590 Walsh
Year 2897 2820 737 2590 Total Portfolio (MVA)
Northwestern Northweste Mathew Walsh
(MVA) rn (MVA) (MVA)
IMVA\
2022 7.0 54.0 34.0 2.5 97.5
2023 7.0 57.0 47.0 2.5 113.5
2024 7.0 57.0 64.0 3.0 131.0
2025 7.0 57.0 71.0 18.0 153.0
2026 7.0 57.0 71.0 32.0 167.0
2027 9.0 60.0 71.0 52.0 192.0
2028 9.0 60.0 71.3 52.2 192.5*
2029 9.0 60.0 71.3 52.2 192.5*
2030 9.0 60.0 71.3 52.2 192.5*
2031 9.0 60.0 71.3 52.2 192.5*
2032 9.0 60.0 71.3 52.2 192.5*
2033 9.0 60.0 71.3 52.2 192.5*
* Limited to 192.5 MVA until such time as SVP, in its sole discretion, determines that SVP can accommodate additional MVA; provided, however, that such determination shall not occur earlier than (1) the completion of SVP transmission and CAISO controlled transmission grid projects and (2) the increase of system capacity.

Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 27 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB Exhibit G2
Letter from Manuel Pineda to Sam Huckaby, dated 9/24/2020 September 24, 2020
Vantage Data Centers
Sam Huckaby, Vice President - Construction
2820 Northwestern Parkway
Santa Clara, CA 95051
Subject: New Data Center at 2590 Walsh
Dear Mr. Huckaby,

SILICON
VALLEY POWER.

CITY OF SANTA CLARA
The City of Santa Clara's Electric Department , Silicon Valley Power, is the electric utility for the City of Santa Clara. Electric service to the subject project will be provided in accordance with the Rules and Regulations for the utility as approved by the Santa Clara City Council. Silicon Valley Power has reviewed the power needs and commitments at all Vantage sites within the City per the property list below:
• 2820 N01ihwestem
• 2897 Northwestern
• 737 Mathew
• 2590 Walsh (new proposed project not yet approved- request for 90 MVA) Based on Vantage's existing and future power needs, Silicon Valley Power should be able to provide the following total power combined for all the sites:
• Up to 126.5 MVA from the current date to the end of Second Quarter of 2022 • Up to 192.5 MVA at Third Quarter of 2022 upon completion of the South Loop Project. o If there are delays on the South Loop Project, it will affect the timeline to increase from 126.5 to 192.5.
o 737 Mathew is limited to 33 MW until the South Loop Project is completed. • Silicon Valley Power is starting the process for additional transmission capacity to the City. The conceptual timeline for completion is Fomih Quarter of 2025. Upon completion of additional transmission, Vantage can increase from 192.5 MV A to 273 MVA.
• If Vantage has a need to exceed 192.5 MVA prior to these timeframes, the City would be interested in partnering on a battery storage project or other generation facility to serve those needs.

Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 28 of 29 ends

DocuSign Envelope ID: 47733377-0B3C-4201-8EA6-AA52EA243FCB The specific details of this service and SVP system modifications required to provide this capacity for 2590 Walsh will be worked out in a Substation Service Agreement at a future date.

The City is also in the process of reviewing and updating its load development fee, which will be applicable for any new project ( or above 192.5 MV A). It is also important to note that all appropriate fees will need to be paid, and this letter does not supersede any requirements or agreements for the already approved sites at 2820 N01ihwestem, 2897 No1ihwestem, and 737 Mathew.

Questions can be directed to Wendy Stone at (408) 615-5648.

Thank you,
~/2-
Manuel Pineda
Chief Electric Utility Officer
City of Santa Clara - Silicon Valley Power
cc: Michael Stoner
881 Martin Avenue • Santa Clara, CA 95050 • 408-615-6600 • Fax 40.8-249-02 17 www .siliconvalleypower.com
Substation Agreement with Vantage Data Centers CA31, LLC Rev 2/1/2022

Page 29 of 29 ends
← All documents from this meeting