Cities Index.
Planned Development Document

City Council and Authorities Concurrent
March 25, 2025

Document
Planned Development Document
Meeting
March 25, 2025
Body
City Council and Authorities Concurrent
Pages
7
Original file
17.6 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

SANTA CLARA PARK

PD REZONING APPLICATION

03.12.2025

2518 MISSION
COLLEGE BOULEVARDSANTA CLARA PARK | NOVEMBER 2
Illustrative Visualization of the proposed development
SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application | PROJECT TEAM |
CLIENT
Irvine Company Apartment Development

ARCHITECT
MVE + Partners

CIVIL ENGINEERING
BKF Engineering

LANDSCAPE ARCHITECT

EPTDESIGN

TRAFFIC

FEHR & PEERS

ENVIRONMENTAL
ROUX Associates
CEQA
MIG, Inc.

SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application

TABLE OF CONTENTS
CHAPTER 1 | INTRODUCTION 1

1.1 Project Description 2

1.2 Project Location 3
CHAPTER 2 | LAND USE 4

2.1 Community Context 5

2.2 Regional Context Map 6-7

2.3 Existing Land Use 8

2.4 Connecivity 9-11

2.5 Mobility 12

2.6 Transportation Demand Management 13-14

2.7 Affordable Housing 15

2.8 Park Concept Inspiration 16-17

2.9 Publicly Dedicated Parkland 18-20

2.10 Private Open Space 21-25

2.11 Sustainability 26-27

CHAPTER 3 | STREETS 28

3.1 Design Principles 29-32
CHAPTER 4 | DESIGN GUIDELINES & STANDARDS 33

4.1 Massing and Architecture 34-43

4.2 Development Standards 44

4.3 Parking 45

4.4 Loading and Service Access 46-47

CHAPTER 5 | INFRASTRUCTURE & UTILITIES 48

5.1 Infrastructure & Utilities 49
CHAPTER 6 | PUBLIC SERVICES 50

6.1 Public Services 51

6.2 Impact to Public Services 52
CHAPTER 7 | FISCAL ANALYSIS 53

7.1 Fiscal Analysis (See Attachment ‘A’) 54
CHAPTER 8 | COMMUNITY OUTREACH 55

8.1 Public Participation 56-59
A |ATTACHMENT 60

1 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 01 | Introduction
2 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 1 | Introduction

1.1 PROJECT DESCRIPTION
The proposed project provides an opportunity,
consistent with the Freedom Circle Focus
Area Plan, to redevelop the existing Office
complex and create a high-density apartment
community, creating a sense of place through
connecting housing opportunities to project-
based amenities, on-site recreation, and public
and private park spaces in a multi-modal
environment. The project consists of 1,792
(inclusive of 298 Density Bonus Units) apartment
units with approximately 1,766,170 gross square
feet (GSF) of residential buildings and 1,017,750
GSF of garage square feet. The overall site density
is 69.7 dwelling units per acre. Of the 1,792 units
proposed, 1,239 of these units will average 667
SF per unit. These units make up 70% of the total
units in the project. The remaining 553 units will
average 839 SF per unit. All product types will
contain a range of studios, studios plus dens,
one and two bedrooms, and have been designed
with the surrounding workforce in mind. The
project will feature 15% affordable units with 5%
very low AMI and 10% moderate at 100% AMI.

The proposed project includes approximately
3,500 GSF of resident and public-serving retail
space and 13,100 GSF of amenity space.

Additional retail uses serving this site are located
nearby at Santa Clara Square, accessed through
the walkable San Tomas Aquino Creek Trail,
and other nearby retail properties in the Patrick
Henry and Mission College area. These facilities
are within a 2-mile radius of this site. This project
implements the vision of the Freedom Circle
Focus Area and will be approved through a
Planned Development Rezoning specifically for
this property.

The proposal will develop new residential
neighborhoods in conjunction with appropriate
affordable housing, amenities, parks, and open
space in a transit supportive region. Other
infrastructure improvements (i.e., sewer, water,
and storm drainage) would also be constructed
or expanded to serve the proposed project.

Figure 1.2: Illustrative Visualization of the proposed development 3 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 1 | Introduction

1.2 PROJECT LOCATION
4 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 02 | Land Use
5 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.1 Community Context
The subject site is a 25.74-acre parcel of land
currently developed for Office and R&D uses
within the central portion of the Freedom Circle
Focus Area in the City of Santa Clara. The
Focus Area Plan designated the site to allow
high-density residential development. The site
is located directly south of Mission College
Boulevard and encircled by Freedom Circle
Drive on the property’s west, east, and south
boundaries. Primary access to the site would be
from Great America Parkway to Mission College
Boulevard, conveniently located off the Bowers/
Great America exit via the 101 freeway.

Irvine Company is proposing to redevelop the
site and provide an apartment community
in compliance with the recently approved
residential plan for the future of this portion of
the Freedom Circle Focus Area. The proposed
project includes street improvements and
upgrades for pedestrians and bicycles that
will improve connectivity and intersection
operations. The apartment community is also
within walking distance of the San Tomas Aquino
Creek Trail, which provides a direct pedestrian
link to Santa Clara Square, Levi Stadium, the
Santa Clara Convention Center, Light Rail, and
the extensive Bay Trail network. The project will
also include both public and private open space
and recreation and will include project-serving
retail for residents and the general public utilizing
the project’s park.

In addition, the Santa Clara Park Apartment
Community is within a short walk, bike ride, or
drive to Irvine Company’s Master planned Santa
Clara Square. This nearby community provides

1.7 million square feet of high-tech employment
space, a 125,000-square-foot neighborhood
retail center anchored by Whole Foods Grocery,
Fleming’s Steakhouse, Il Fornaio, Eureka, and
Puesto, and another 40,000 square feet of
ground floor retail along an activated mixed-use
frontage to a similar sized residential community.

This community is built within the backdrop of
11 acres of public parks and private recreation
areas.

The Freedom Circle Focus Area covers
approximately 108 acres and currently contains
predominantly commercial uses such as biotech
and electronics, business offices, a hotel
(Marriott), and various support services (such
as car rental, UPS store, medical/dental, and
restaurants). Great America Parkway generally
bounds the Plan Area to the west, California’s
Great America amusement park to the north,
San Tomas Aquino Creek to the east, and U.S. 101
to the south. The Plan Area is relatively flat and
developed, with buildings ranging in height from
two and three stories to up to 13 stories (Marriott
Hotel) in the west; buildings in the rest of the Plan
Area range from one to three stories. Directly to
the east of the proposed Irvine Company project
is the entitled Greystar project, proposed to be
a 1,075-unit multi-family residential project (with
some project-serving retail and a two-acre public
park) proposed for two currently vacant parcels
formerly owned by Intel Corporation in the
southeastern portion of the Future Focus Plan
Area. The Plan Area is generally underutilized,
and some buildings are vacant. (Plan area-wide
description, excerpt from Freedom Circle Focus
Area DEIR section 2.1.1)
Currently, no residential land uses, public parks,
or historic structures exist in the Plan Area. The
proposal will facilitate changing the current
underutilized office use, consistent with the
Focus Area Plan, into a walkable, connected
urban high-density community with various
amenities for its residents and the general public
visiting the project’s parks and using pedestrian
and bicycle features.

Consistent with the Freedom Circle Focus plan,
a comprehensive rezoning plan will be filed with
this project. The City certified a Programmatic
EIR for the Freedom Circle Future Focus Area,
such that subsequent implementing projects,
including but not limited to a General Plan
Amendment, PD Rezone, Architectural Review,
on- and off-site utilities, and/or all project
amenities and features necessary to implement
the plan may tier off of the certified document
by utilizing a CEQA Checklist or an Addendum
(perhaps with focused project-specific studies).
6 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.2 Regional Context Map
Figure 2.2-1: Regional Location and Aerial
Figure 2.1-2: Site Plan
7 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

FREEDOM CIRCLE

MISSION COLLEGE BLVD

FREEDOM CIRCLE
8 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.3 Existing Land Use
The Santa Clara Park (SCP) project existing land
use is office/R&D consisting of 427,379 SF and
will be redeveloped to a residential community.

The SCP site is located within the approximately
108-acre Freedom Circle Future Focus Area
Plan Area, as designated by the General Plan, in
the northwestern part of the city and generally
bounded by Great America Parkway to the west,
California’s Great America amusement park to
the north, San Tomas Aquino Creek to the east,
and U.S. 101 to the south. Except for the currently
vacant Greystar project site located in the
southeast portion of the Future Focus Area Plan
Area, the Plan Area is essentially built out and is
in an area of the city primarily designated in the
General Plan as High Intensity Office/R&D with
some Regional Commercial, with uses such as
biotech and electronics, business offices, hotels,
and various support services (such as car rental,
UPS store, medical/dental, and restaurants).

According to the General Plan Land Use
Diagram, the site is designated as Very High
Density Residential (51-100 dwelling units per
acre). The Freedom Circle Future Focus Area
was added as a Phase III Future Focus Area
to the General Plan in 2022. Per the General
Plan and Freedom Circle Focus Area Plan, any
change in land use designation or rezoning of
land within the Freedom Circle area is subject to
the requirements of the Future Focus Area Goals
and Policies of the General Plan. The SCP project
will accomplish this via its proposed General
Plan Amendment and rezoning.

Buildings cover about 23 percent of the Future
Focus Area Plan Area. The Plan Area has a
“superblock street layout” with ample surface
parking that supports dependence on cars. The
buildings are spaced relatively far apart, with
surface parking lots in between. Pedestrian
linkages are limited.
/0□/2□/3□/4□/5□/6□/7□/8□□
/10□/5□/6□/6□/2□/10□/11□/4□/12□/4□/11□/13
/14 /15 /16 /16 /17 /18 /19/20/21 /22 □/20/21 □
/24 /17 /25/25/15 /21 /20 /19 /26 □
/25 /17 /27 /20/28/20/19/26
/29 /30 /31/32/33 /34 /35 □ /33 /37/38/38/39/30 /35 /40/41□ /41/40/42 /40/43 /39/38/44 /40/32/35 /8/45/46/45/47/48
/49 /29 /50 □/51 /37 /33 □/52 /39 /37 /35 /40
/53 /31 /43/35 /30 /31 /34/32 □/54 /55 /37 /35 /35 /43/40 □/52 /39 /37 /35 /40 /50 /56 /40 □/54 /55 /37 /35 /35 /43/40 □/52 /39 /37 /35 /40 /49 /29 /50 □/57 /34/58 /55 /35 □/52 /31 /34/43□/57 /34/32 /40 /53 /31 /43/35 /30/31 /34/32 □/57 /34/32 /40
/50 /53 /59 /60/53 /31 /38 /34/35 /39 /43□/53 /39 /30 /30 /34/41 /39 /30 □/57 /34/32 /40 /7/10/2□
/61 /62 /63 /62 /64/65 /47
/8/63/66 /67 /45/47/68/45□
/10 /63 /69/62 /67/63 /64/47 □
/61 /62 /63 /62 /64/65 /47
/0□/2□/3□/4□/5□/6□/7□/8□□
/10□/5□/6□/6□/2□/10□/11□/4□/12□/4□/11□/13
/14 /15 /16 /16 /17 /18 /19/20/21 /22 □/20/21 □
/24 /17 /25/25/15 /21 /20 /19 /26 □
/25 /17 /27 /20/28/20/19/26
/29 /30 /31/32/33 /34 /35 □ /33 /37/38/38/39/30 /35 /40/41□ /41/40/42 /40/43 /39/38/44 /40/32/35 /8/45/46/45/47/48
/49 /29 /50 □/51 /37 /33 □/52 /39 /37 /35 /40
/53 /31 /43/35 /30 /31 /34/32 □/54 /55 /37 /35 /35 /43/40 □/52 /39 /37 /35 /40 /50 /56 /40 □/54 /55 /37 /35 /35 /43/40 □/52 /39 /37 /35 /40 /49 /29 /50 □/57 /34/58 /55 /35 □/52 /31 /34/43□/57 /34/32 /40 /53 /31 /43/35 /30/31 /34/32 □/57 /34/32 /40
/50 /53 /59 /60/53 /31 /38 /34/35 /39 /43□/53 /39 /30 /30 /34/41 /39 /30 □/57 /34/32 /40 /7/10
/61 /62 /63
/8/63/66 /67 /45/47/68/45□
/10 /63 /69/62 /67/63 /64/47 □
/61 /62 /63 /62 /64/65 /47
Figure 2.4-1: Regional Connectivity
9 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.4 Connectivity
Project Site
/0
/1
/2
/3
/4
/5□
/7/8/9/9/10/11/12 □
/14 /15/8 /16 /17/9 □
/7 /11 /16/18 /19□
/20 /8/9/21□ /22 /17 /21/23
/24/25 □/27 /28 /29 /30 /31 □/32 /33 /32 /32 /34□/35 /31 /36 □/37 /38/35 /39 □/40 /41□ /42/28/25/35 /28□ /37 /43 /28/29 /28□ /28/44/44/29 /40/45/36/46□ /35 /31/36/38/29 □ /44 /43/28 /25 □/35 /40 □/47 /48 /44 /44 /43/36 /49 /36 /25 /35 □/35 /31 /36 □ /50 /36 /25 /36 /29 /28 /43□/51 /43/28 /25 □/28 /25 /46 □/46 /36 /52 /25 /36 □/28 □ /41/48 /35 /48 /29 /36 □/40 /41□/31 /40 /48 /47 /38/25 /53 □/25 /36 /28 /29 □/54/40 /55 □ /30/36/25/35 /36/29 /47 /34 □ /29 /36/35 /28/38/43 □ /28/25/46□ /25/28/35 /48/29 /28/43 □ /40 /44 /36 /25 □ /47/44 /28 /30/36 /47/56
/0
/1
/2
/1
/3
/4
/5
□□□□□□□□□□□□□□□□/58 □/59 /60 /61/62 /63/64 /60 /65 /66 □/67 /68 /62 /69 □/68 /61/70 /71 /72 □/62 /69 /66 □ /71 /70 /73 /62 /69 /66 /73 /71 □/74 /70 /60 /71 /75 /68 /73 /76 □/70 /77□/62 /69 /66 □/78 /70 /79 /60 /65 □/58 /73 /66 /68 □ /80 /63 /61 /61 □ /70/77 /77 /66/73 □ /68/71/70/62 /69/66/73 □ /79/73 /70/65 /65 /64 /65 /63 /62 /66□ /79/70/71/71/66/79/62 /70/73 □ /77 /70/73 □ /74/63 /81/66/65 □ /68/71/75□ /67/66/75/66/65 /62 /73 /63 /68/71/65 /82 □ /83 /68 /62 /66 /80 /68 /76 /65 □/68 /61/70 /71 /72 □/84 /63/65 /65 /63/70 /71 □/85 /70 /61/61/66 /72 /66 □/86 /61/87 /75 /82□ /68 /62 □/62 /69 /66 □/78 /70 /79 /60 /65 □/58 /73 /66 /68 □/74 /70 /60 /71 /75 /68 /73 /63/66 /65 □/80 /63/61/61□/74 /66 □ /66 /65 /62 /68 /74 /61/63/65 /69 /66 /75 □/62 /70 □/73 /66 /63/71 /77/70 /73 /79 /66 □/63/59 /68 /72 /66 /68 /74 /63/61/63/62 /76 /88□ /68/71/75□ /69/63 /72/69/61 /63 /72/69/62 □ /77 /66/68/62 /60/73 /66/65 □ /68/71/75□ /68/59 /66/71/63 /62 /63 /66/65 /82 □ /58 □/79 /66 /71 /62 /73 /68 /61□/71 /70 /75 /66 □/80 /63/61/61□/68 /79 /62 □/68 /65 □/68 □ /67 /60 /74 /61/63/79 /89/90 /60 /68 /65 /63/64 /67 /60 /74 /61/63/79 □/72 /68 /62 /69 /66 /73 /63/71 /72 □/65 /67 /68 /79 /66 □ /68/71/75□ /67/73 /63 /70/73 /63 /62 /63 /91 /66□ /72/73 /70/60/71/75/64 /92/70/70/73 □ /68/79/62 /63 /87/66□ /60 /65/66 /65/82 □
□□□□□□□□□□□□□□□□/93 /65 /62 /68 /74 /61/63/65 /69 /63/71 /72 □/67 /66 /75 /66 /65 /62 /73 /63/68 /71 □/68 /71 /75 □ /74 /63/81 /66 □/71 /66 /62 /80 /70 /73 /81 □/62 /70 □/63/71 /79 /73 /66 /68 /65 /66 □/63/71 /62 /66 /73 /71 /68 /61□ /80 /68 /61/81 /68 /74 /63/61/63/62 /76 □/68 /71 /75 □/79 /73 /70 /65 /65 /64 /65 /63/62 /66 □/79 /70 /71 /71 /66 /79 /62 /63/87 /63/62 /76 □ /80 /69 /63/61/66 □/70 /67 /66 /71 /63/71 /72 □/60 /67 □/70 /67 /67 /70 /73 /62 /60 /71 /63/62 /63/66 /65 □/77/70 /73 □ /72/73 /70/60/71/75/64 /92/70/70/73 □ /68/79/62 /63 /87 /68/62 /63 /70/71/82 □ /58 □/62 /80 /70 /64 /68 /79 /73 /66 □/79 /70 /59 /59 /60 /71 /63/62 /76 □/67 /68 /73 /81 □/80 /63/61/61□ /67 /73 /70 /87 /63/75 /66 □/68 /71 □/70 /67 /66 /71 □/65 /67 /68 /79 /66 □/68 /71 /75 □/70 /77/77/66 /73 □ /77 /68/79 /63 /61 /63 /62 /63 /66/65 □ /62 /70□ /66/71/69/68/71/79 /66□ /79 /70/71/71/66/79 /62 /63 /87 /63 /62 /76 □ /62 /70□ /62 /69 /66 □/94 /68 /71 □/95 /70 /59 /68 /65 □/58 /90 /60 /63/71 /70 □/85 /73 /66 /66 /81 □/95 /73 /68 /63/61/82□ /96 /67 /66 /71 □/68 /71 /75 □/68 /79 /62 /63/87 /66 □/72 /73 /70 /60 /71 /75 /64 /92 /70 /70 /73 □ /77/73 /70 /71 /62 /68 /72 /66 /65 /88□/80 /66 /61/61/64 /75 /66 /65 /63/72 /71 /66 /75 □/61/68 /71 /75 /65 /79 /68 /67 /63/71 /72 □ /68/71/75□ /70/71/64 /65 /63 /62 /66□ /68/59 /66/71/63 /62 /63 /66/65 □ /80 /63 /61 /61 □ /66/71/65 /60/73 /66□ /87 /63/74 /73 /68 /71 /79 /76 /82□
□□□□□□□□□□□□□□□□/58 □/97 /78 /73 /66 /66 /75 /70 /59 □/98 /70 /70 /67 /99 □/84 /60 /61/62 /63/64 /100 /65 /66 □ /67 /68 /62 /69 □/80 /63/61/61□/79 /73 /66 /68 /62 /66 □/68 □/65 /68 /77/66 □/68 /71 /75 □/77/60 /71 /79 /62 /63/70 /71 /68 /61□ /74/63 /81/66□ /68/71/75□ /67/66/75/66/65 /62 /73 /63 /68/71□ /73 /70/60/62 /66□ /62 /70□ /66/71/69/68/71/79/66□ /79 /70/71/71/66/79 /62 /63 /87 /63 /62 /76 □ /68/71/75□ /61 /63 /71/81□ /62 /70□ /70/71/64 □ /68/71/75□ /70 /77/77/64 /65 /63/62 /66 □/62 /73 /68 /63/61□/67 /68 /62 /69 □/71 /66 /62 /80 /70 /73 /81 /65 /82□ Figure 2.4-2: Freedom Circle Focus Area Plan
10 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
/0/1/2/3/4 /5/6□ /8/5/3/9□
/3/10 /5/8/11 /4 /11 /5/12□ □
/13 /14 /15 /16 /14 □/18 /19/14 /20 /14 □/21 /14 /20 /22 □/23/24 □/14 □/24 /25 /26 /20 /16 □/27 /23/24 /16 /14 /15 /28 /29 □/30/20 /26 /31 □ /14 □/32 /14 /20 /23/29 /16 /33 □/26 /30□/14 /31 /29 /15 /23/16 /23/29 /24 □/14 /15 /27 □/24 /29 /20 /32 /23/28 /29 /24 /34□/31 /14 /15 /33 □ /26 /30□/35 /25 /23/28 /25 □/28 /14 /15 □/36 /29 □/20 /29 /14 /28 /25 /29 /27 □/32 /23/14 □/14 □/37 /38/39 /31 /23/15 /40 /16 /29 □ /35 /14 /19/22 □/16 /26 □/13 /14 /15 /16 /14 □/18 /19/14 /20 /14 □/13 /41 /40 /14 /20 /29 □/26 /15 □/16 /25 /29 □/13 /14 /15 □ /42 /26 /31 /14 /24 □/43 /41 /40 /23/15 /26 □/18 /20 /29 /29 /22 □/42 /20 /14 /23/19/44 /45 /46/47/48 /49/50/51 /49/52/48
/45 /46 /48 /49 /53/54
/55 /56 /48/46 /54
/55 /46/49/54 /48 /57/58/49/51 /46
/59 /51/56 /58 /46 /51/60
Figure 2.4-3: Amenities
11 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

SANTA CLARA PARK

PROJECT CIRCULATION DIAGRAM

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

FREEDOM CIRCLE
FUTURE

PUBLIC PARK
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)
BLDG 1
BLDG 2
BLDG 3
BLDG 5
BLDG 4
Pool
Pool
AMERICA PKWY.

HICHBORN DR.

GREAT
101-FREEWAY-OFFRAMP
SANTA CLARA PARK January 24, 2025 L10
Legend

PROJECT CIRCULATION DIAGRAM
0 50 100
Primary Pedestrian Connection Point
Public Pedestrian Path
San Tomas Aquinos Trail
Freedom Circle and Mission College Blvd.

Bike Lane
Private Street 'A' Bike Lane
Vehicular Garage Entry
Vehicular / Bike Connection
Loading Zone
Existing Crosswalk
Proposed Crosswalk
Retail
Mailroom
Amenity
6' Pedestrian Walk
(Class I Shared-use Path)
(Class IV Bike Path)
(Class II Bike Path on Both Sides of Street)

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

FREEDOM CIRCLE
FUTURE

PUBLIC PARK
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)
BLDG 1
BLDG 2
BLDG 3
BLDG 5
BLDG 4
Pool
Pool
AMERICA PKWY.

HICHBORN DR.

GREAT
101-FREEWAY-OFFRAMP
Primary Gateway
Secondary Gateway
Primary Bike / Pedestrian Connection Point
Figure 2.5: Project Circulation
12 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.5 Mobility
13 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.6 Transportation Demand Mangement
TDM Program
This chapter provides details on the TDM
measures offered to onsite residents, employees
(leasing office and maintenance), and visitors.

The measures are designed to allow visitors and
residents to reduce single occupancy vehicle
trips to and from the development. To gauge the
effectiveness of the TDM program monitoring
and evaluation of the program will occur as
described in the Monitoring and Reporting
section. The goal of the TDM program is to
reduce vehicle miles travelled (VMT) by 20%,
with 10% from project design features, and 10%
from active TDM measures per the city’s Climate
Action Plan (2022).

TDM Strategies
The TDM strategies offered to Santa Clara
Park residents, employees, and visitors include
measures to encourage transit use, ridesharing,
walking, biking, and car sharing for commute
trips as well as trips off-site during the day. There
is a strong emphasis on providing tools and
information to residents to help them plan their
commute by bike, transit, or ride-sharing as well
as encouraging them to use these modes both to
and from the site as well as internally within the
site. Visitors are also provided with information
about alternative modes to the site. (Figure 2.6)
illustrates the strategies that are provided to
Santa Clara Park in terms of physical design
features and TDM programs and services.

Housing Density and Destination Accessibility
As mentioned in the project description, the
Santa Clara Park Redevelopment Project would
construct 1,792 residential dwelling units (15%
affordable units) of the 2,500 dwelling units
remaining in the Focus Area Plan, or 70% of
the remaining residential units allowed under
the Focus Area Plan. The 25.7-acre site with
427,380 square feet of existing office space will
be replaced by 1,792 residential units with over
nine acres of public and private recreation and
open space. Santa Clara Park is near major
destinations, including Levi’s Stadium, Great
America Theme Park, Santa Clara Convention
Center, employment clusters in Santa Clara and
North San Jose, and Mission College west of
the Project site on Mission College Boulevard.

Destination accessibility is measured in terms of
the number of jobs or other attractions reachable
within a given travel time, which tends to be
the highest at central locations and lowest at
peripheral ones. Proximity to major destinations
reduces vehicle trip lengths, thereby reducing
VMT. It also increases the potential for people to
walk and bike to these destinations and therefore
reduces Project-generated VMT.

Page 7 of 10 ends

Table 1: Santa Clara Park Proposed TDM Strategies and VMT Reduction Measures TDM Measure Description
Project Design Features
Housing Density Included in project description
Destination Accessibility Project location (near jobs, retail, & entertainment) Bicycle Parking (Short-Term) Included in project design Bicycle Parking (Long-Term) Included in project design
On-Site Bike Repair Facilities Included in project design Pedestrian Network Included in project design
Multimodal Signage and Amenities Included in project design TDM Programs
Unbundled Parking Residents can make the choice on whether to have pa rking Carshare Program / Carshare Parking Residents will have access to an on-site carshare vehicle Transportation Coordinator /
Commute Trip Reduction Marketing
On-site TDM contact will be identified to coordinate TDM programs
Trip Reduction Information Move in package that describes the TDM programs and identifies nearby transit options
Orientation to TDM Program Trip reduction information package provided to residents at move in
Rideshare/Ridematching Services Ridematching services will be provided by Rideshare SF Bay https://511.org/carpool
Emergency/Guaranteed Ride Home
Program
Reimbursement of taxi or rideshare cost for residents that use public transit will be sponsored by Irvine Company
Transit Fare Subsidy (VTA and/or
Caltrain)
Offer a one-time free monthly pass on move-in as incentive to use transit
Source: Fehr & Peers, 2024.

Figure 2.6: TDM Measure Chart
14 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
Project Design Features - 10%
Active TDM Measures - 10%
Figure 2.7: Affordable Housing Concept
15 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.7 Affordable Housing
The proposed project will comply with the City’s
affordable housing ordinance for residential
rental projects. Irvine Company will memorialize
the details in an Affordable Housing Rental
Agreement, representing an equal value
satisfying the City’s 15% requirement while
maintaining a 100% AMI across the affordable
units. The proposal is 5% of non-density bonus
units at Very Low and 10% of non-density bonus
at Moderate, averaging 100% AMI. The affortable
units will be spread out evenly between all five
buildings and will have the same proportion of
studios, one bedroom, and two bedroom units
as the market rate units. As 5% of the affordable
units will be Very Low, one concession plus any
necessary waivers or reductions of development
standards under the State Density Bonus Law
are authorized.

Figure 2.8-1: Redwood Life Cycle
16 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.8 Public Concept Inspiration
There is a robust park & open space program
for Santa Clara Park and it has been designed
around native redwoods found on-site.

The life cycle of a redwood is inspiration for the
public park system at Santa Clara Park.
“It first starts out as a seed from a cone which
sprouts, or ‘germinates. ’ The seed grows into a
seedling, then after many, many years, into a
mature tree. at which point it spreads new seeds
through “outplanting” and dropping of cones
which grow into new saplings. Often, after the
sequoia dies, life continues to develop as other
plants in the redwood forest start to grow on the
dead tree. The process creates a circular loop of
growth, maturity, death, and new life. ”
The stages of a Redwood Tree Growth:
• Seedling
• Sprout
• Young Tree / Sapling
• Outplanting
• Fully Grown / Mature Tree
• Fallen / Ancient Tree
SANTA CLARA PARK March 12, 2025 L114OVERALL PARK ZONE DIAGRAM 0 50 100 200

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

FREEDOM CIRCLE
FUTURE

PUBLIC PARK
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)
BLDG 1
BLDG 2
BLDG 3
BLDG 5
BLDG 4

A PLACE FOR GROWTH AND

EXPLORATION

THE SAPLING OPEN SPACE

A PLACE FOR SOCIALIZATION

THE OUTPLANTING PARK

A PLACE FOR REFLECTION

THE REFLECTION PARK

A PLACE WHERE ALL CYCLES OF THE

REDWOOD TREES ARE REFLECTED
THE "FULL CIRCLE" PARK
SANTA CLARA PARK January 24, 2025 L114OVERALL PARK ZONE DIAGRAM 0 50 100 200

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

FREEDOM CIRCLE
FUTURE

PUBLIC PARK
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)
BLDG 1
BLDG 2
BLDG 3
BLDG 5
BLDG 4

A PLACE FOR GROWTH AND

EXPLORATION

THE SAPLING OPEN SPACE

A PLACE FOR SOCIALIZATION

THE OUTPLANTING PARK

A PLACE FOR REFLECTION

THE REFLECTION PARK

A PLACE WHERE ALL CYCLES OF THE

REDWOOD TREES ARE REFLECTED
THE "FULL CIRCLE" PARK
Figure 2.8-2: Overall Parks Zone Diagram
17 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
18 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.9 Publicly Dedicated Parkland
The proposed Santa Clara Park development
emphasizes the design and implementation
of public open space. These public areas help
shape and define the neighborhood character
by creating a sense of community, focusing
on intentional placemaking. Santa Clara Park
Apartment Community creates a walkable,
active, diverse experience while promoting social
interaction, sustainability, and accessibility.

Integral to the site design is a park program
composed of two distinct elements:

Public Neighborhood Park:

The buildings at Santa Clara Park will be nestled
into a Public Park and open space system
that will span throughout the entire site and
feature a variety of passive and active amenities
throughout. Included within this public park
network will be a large open space at the
southern end of the site, which will feature a
flexible lawn for active recreation, picnic areas,
sports courts, kids’ playground (with separate
areas serving ages 2-5 and 6-12), and a dog park.

In addition, an interconnected set of mini-parks
throughout the perimeter and interior portion of
the site will provide a ¾ mile loop trail, passive
and active recreation opportunities, and will
serve as an important public linkage from the
neighboring Freedom Circle District to the
trailhead at the local San Tomas Aquino Creek.

Private/Community-Serving Park Areas:

Additionally, 4.222 acres of private park space will
provide residents with recreation opportunities,
including two large pool areas, outdoor dining,
picnic areas, game/lounge areas, and passive
garden spaces spread throughout the entire
community. These spaces will allow residents
to engage in passive and active recreation near
their homes. The project will also feature 0.085
acres of private building amenity spaces.

The plan respects the Freedom Circle Future
Focus Area’s desire to integrate publicly available
open spaces within the proposed project. To
that end, the project has been designed with
a north-south linear park starting at Mission
College Boulevard, opening up to a public park
fronting Freedom Circle Drive. An east-west
“Main Street” bisects the project and provides
access through the site, connecting both sides
of the Freedom Circle Drive loop, thereby
providing multi-modal connectivity. The two
adjacent projects offer parks and open space
to the public by complementing each other in
design and allowing for contiguous use of the
park amenities. Park amenities and open spaces
have been added and designed to serve all ages
in the community through active and passive
recreational opportunities.

The framework for this new community
includes a multi-layered landscape focus. The
development is committed to preserving many
mature specimen trees on site and integrating
them seamlessly into the new site plan. This effort
safeguards the heritage trees in their existing
locations and strategically relocates trees
deemed suitable for transplanting. The result
will be a harmonious coexistence of the new
buildings and park within the context of these
established trees, creating a mature verdant
landscape setting within the City. The landscape
plan envisions preserving approximately 130
existing trees, including Redwoods and other
species (pending review of City Arborist and
Landscape Contractor), which will either be
protected in place or transplanted to different
locations throughout the site. For those redwood
trees that are unsuitable for preservation, an
effort will be made (where feasible) to re-purpose
the salvaged wood into furniture or other site
elements. Existing trees requiring removal will
be replaced at a 2:1 ratio at a size of 24” Box or
larger per the City of Santa Clara guidelines. The
new trees will be carefully selected for shade,
utility screening, or other visual interest to
complement the overall landscape composition.

Overall, the Santa Clara Park Apartment
Community will feature over 4.225 acres of
continuous public park space and over 4.222
acres of private park and amenity spaces, all
nestled under the grandeur of the existing
redwood trees.

SANTA CLARA PARK January 24, 2025 L120NEIGHBORHOOD PARK - BUBBLE DIAGRAM 0 15 30 60
PlayElements of
Play
Ages 2-5 Ages 6-12
Balancing
Sliding
Brachiating
Spinning
Climbing
Swinging
Running /
Free Play
Total:

Inclusive Play
Elements
Capacity
(Ages 2-5)
Play Capacity
(Ages 6-12)
Total
Playground
Capacity
1-2
NOTE:
- Elements of Play, Equipment and Capacity pending final design review and approval. - More detailed information to be provided through the public input design review and approval process.
1-2
1-2
1-2
1-2
1-2
1-2
1-2
7-14
1-2
1-2
1-2
1-2
1-2
1-2
1-2
1-2
7-14
2-4
2-4
2-4
2-4
2-4
2-4
2-4
2-4
14-28

FREEDOM CIRCLE
BLDG 4

FREEDOM CIRCLE
LARGE
FLEX
FIELD

PAVILLION
PICNIC

PLAY AREA

PLAY AREA
(6-12)
(2-5)
PICNIC

SMALL FLEX
FIELD
(15 Stalls)

LARGE DOG RUN

RESTROOMS
BLDG 5BLDG 5
(+/- 0.70 acres)
(+/- 0.12 acres)
(+/- .08 acres)
Connection to
Neighboring Park

FITNESS
Sculptural
Garden
Space
with
Seating

PLAZA/GAME
AREA
- Fitness Garden / Equipment
- Meditation/Zen Garden
· Sit Up Station
· Pull Up Station
· Multi Ladder Station
· Balancer Station
· Twister
SMALL

GATHERING
AREA

ONSITE PARKING
(+/- 0.06 acres)
SMALL

DOG RUN
Figure 2.9-1: Neighborhood Park Zone Diagram
19 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
LOBBY
3,600 SF
MARKET 3,600 SF

CO-WORKING LOBBY
2,400 SF

MAILROOM
LOBBY
LOBBY

LOBBYLOBBY
LOBBY
LOBBY
1,600 SF

MAILROOM
7,200 SF

FITNESS
LOBBY
LOBBY2,100 SF

MAILROOM
LOBBY
3,000 SF

RESIDENT SERVICES
OFFICE
LOBBY
2,400 SF

MAILROOM
LOBBY
LOBBY
1,700 SF

MAILROOM
LOBBY
LOBBY
LOBBY
LOBBY
LOBBY
SANTA CLARA PARK March 12, 2025 L121PARK CREDIT PLAN

PARK CREDIT LEGEND
PUBLIC OPEN SPACE - 100% CREDIT
PRIVATE OPEN SPACE - 50% CREDIT

LANDSCAPE SETBACK / BUFFER ZONE - NO CREDIT
SUBTOTAL 4.225 AC *
SUBTOTAL 4.222 AC *
50% CREDIT x 4.222 AC = 2.111 AC *
- LANDSCAPED & FURNISHED AREAS
- PICNIC AREAS
- POOL AREAS
- FITNESS AND GAME AREAS
PRIVATE BUILDING AMENITY SPACES - 50% CREDIT
SUBTOTAL 0.17 AC (7,200 S.F.)
50% CREDIT x 0.17 AC = 0.085 AC

FITNESS
TOTAL PARK CREDIT AREA (PUBLIC + PRIVATE)

4.225 AC + 2.111 AC = 6.336 AC
PER CITY OF SANTA CLARA, THE FOLLOWING (4) ELEMENTS
WILL BE PROVIDED WITHIN THE PRIVATE PARK AREAS:
0 50 100 200

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

EXISTING COMMERCIAL
(NOT APART)
BLDG 1
BLDG 2
BLDG 3
BLDG 5
BLDG 4

NEIGHBORHOOD
PARK

FITNESS
NEIGHBORHOOD PARK 3.165 AC (137,882 S.F.)
MINI PARK 1
COURT 4
COURT 1
COURT 2
COURT 3
POOL AREA 1
COURT 5
COURT
POOL AREA 2
COURT 9
COURT 10
COURT 11

SPACE / LOCATION ELEMENT LISTED IN CITY CODE TOTAL AREA / SQUARE FEET COURTYARD 1 (B1)
COURTYARD 2 (B1 / B2)
COURTYARD 3 (B2)
COURTYARD 4 (B3)
COURTYARD 5 (B3)
COURTYARD 6 (B3)
COURTYARD 7 (B3)
COURTYARD 8 (B3)
COURTYARD 9 (B4)
COURTYARD 10 (B4)
COURTYARD 11 (B5)
POOL AREA 1
POOL AREA 2
FITNESS (B3 - Interior)
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #8 - RECREATION BUILDING
ELEMENT #6 - GAME, FITNESS AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #7 - ACCESSIBLE SWIMMING POOL

AND ADJACENT DECK AREA
ELEMENT #7 - ACCESSIBLE SWIMMING POOL

AND ADJACENT DECK AREA

PRIVATE OPEN SPACE BREAKDOWN
8,042 sq. ft. - excludes 1,930 sq. ft.
for 4 ft. perimeter setback
7,200 sq. ft. (0.17 AC)
(REFER TO THE ITEMIZED PRIVATE OPEN SPACE BREAKDOWN BELOW) PRIVATE OPEN SPACE SUBTOTAL 4.222 AC *
8 COURT
7 COURT
6 15,099 sq. ft. - excludes 2,786 sq. ft.
for 4 ft. perimeter setback
4,016 sq. ft. - excludes 1,381 sq. ft.
for 4 ft. perimeter setback
2,246 sq. ft. - excludes 830 sq. ft.
for 4 ft. perimeter setback
5,845 sq. ft. - excludes 1,769 sq. ft.
for 4 ft. perimeter setback
3,783 sq. ft. - excludes 1,053 sq. ft.
for 4 ft. perimeter setback
2,233 sq. ft. - excludes 780 sq. ft.
for 4 ft. perimeter setback
2,651 sq. ft. - excludes 1,062 sq. ft.
for 4 ft. perimeter setback
7,372 sq. ft. - excludes 1,779 sq. ft.
for 4 ft. perimeter setback
1,107 sq. ft. - excludes 713 sq. ft.
for 4 ft. perimeter setback
4,075 sq. ft. - excludes 1,407 sq. ft.
for 4 ft. perimeter setback
33,976 sq. ft. - excludes 2,184 sq. ft.
for 4 ft. perimeter setback
24,469 sq. ft. - excludes 1,515 sq.
ft. for 4 ft. perimeter setback
MINI PARK 2
MINI PARK 1 0.702 AC (30,574 S.F.)
MINI PARK 2 0.421 AC (18,332 S.F.)
COURTYARD 12 (B1)
COURTYARD 13 (B3) ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #6 - GAME, FITNESS AREA 21,348 sq. ft. - excludes 3,199 sq. ft. for 4 ft. perimeter setback
33,936 sq. ft. - excludes 3,711 sq.
ft. for 4 ft. perimeter setback
COURT
13 COURT
13 COURT
13 COURT
12 COURT
12 COURT
15 COURT
14 COURTYARD 14 (B5)
COURTYARD 15 (B5)
4,504 sq. ft. - excludes 635 sq. ft.
for 4 ft. perimeter setback
7,270 sq. ft. - excludes 1,331 sq. ft.
for 4 ft. perimeter setback
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #5 - FAMILY PICNIC AREA
*
NOTE:
* Public and Private area calculations are estimates at this time.

Final calculations are to be determined with the final design and is subject to Park Department confirmation.

TOTAL PARKS AND PRIVATE OPEN SPACE

4.225 AC + 4.222 AC = 8.447 AC
LOBBY
3,600 SF
MARKET 3,600 SF

CO-WORKING LOBBY
2,400 SF

MAILROOM
LOBBY
LOBBY

LOBBYLOBBY
LOBBY
LOBBY
1,600 SF

MAILROOM
7,200 SF

FITNESS
LOBBY
LOBBY2,100 SF

MAILROOM
LOBBY
3,000 SF

RESIDENT SERVICES
OFFICE
LOBBY
2,400 SF

MAILROOM
LOBBY
LOBBY
1,700 SF

MAILROOM
LOBBY
LOBBY
LOBBY
LOBBY
LOBBY

PARK CREDIT LEGEND
PUBLIC OPEN SPACE - 100% CREDIT
PRIVATE OPEN SPACE - 50% CREDIT

LANDSCAPE SETBACK / BUFFER ZONE - NO CREDIT
SUBTOTAL 4.225 AC *
SUBTOTAL 4.222 AC *
50% CREDIT x 4.222 AC = 2.111 AC *
- LANDSCAPED & FURNISHED AREAS
- PICNIC AREAS
- POOL AREAS
- FITNESS AND GAME AREAS
PRIVATE BUILDING AMENITY SPACES - 50% CREDIT
SUBTOTAL 0.17 AC (7,200 S.F.)
50% CREDIT x 0.17 AC = 0.085 AC

FITNESS
TOTAL PARK CREDIT AREA (PUBLIC + PRIVATE)

4.225 AC + 2.111 AC = 6.336 AC
PER CITY OF SANTA CLARA, THE FOLLOWING (4) ELEMENTS
WILL BE PROVIDED WITHIN THE PRIVATE PARK AREAS:

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

MERCIAL

NOT APART)
BLDG 1
BLDG 2
BLDG 3
BLDG 5
BLDG 4

NEIGHBORHOOD
PARK

FITNESS
NEIGHBORHOOD PARK 3.165 AC (137,882 S.F.)
1 COURT 4
COURT 1
COURT 2
COURT 3
POOL AREA 1
COURT 5
COURT
POOL AREA 2
COURT 9
COURT 10
COURT 11

SPACE / LOCATION ELEMENT LISTED IN CITY CODE TOTAL AREA / SQUARE FEET COURTYARD 1 (B1)
COURTYARD 2 (B1 / B2)
COURTYARD 3 (B2)
COURTYARD 4 (B3)
COURTYARD 5 (B3)
COURTYARD 6 (B3)
COURTYARD 7 (B3)
COURTYARD 8 (B3)
COURTYARD 9 (B4)
COURTYARD 10 (B4)
COURTYARD 11 (B5)
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #6 - GAME, FITNESS AREA
ELEMENT #5 - FAMILY PICNIC AREA

PRIVATE OPEN SPACE BREAKDOWN
8,042 sq. ft. - excludes 1,930 sq. ft.
for 4 ft. perimeter setback
(REFER TO THE ITEMIZED PRIVATE OPEN SPACE BREAKDOWN BELOW)

8 COURT
7 COURT
6 15,099 sq. ft. - excludes 2,786 sq. ft.
for 4 ft. perimeter setback
4,016 sq. ft. - excludes 1,381 sq. ft.
for 4 ft. perimeter setback
2,246 sq. ft. - excludes 830 sq. ft.
for 4 ft. perimeter setback
5,845 sq. ft. - excludes 1,769 sq. ft.
for 4 ft. perimeter setback
3,783 sq. ft. - excludes 1,053 sq. ft.
for 4 ft. perimeter setback
2,233 sq. ft. - excludes 780 sq. ft.
for 4 ft. perimeter setback
2,651 sq. ft. - excludes 1,062 sq. ft.
for 4 ft. perimeter setback
7,372 sq. ft. - excludes 1,779 sq. ft.
for 4 ft. perimeter setback
1,107 sq. ft. - excludes 713 sq. ft.
for 4 ft. perimeter setback
4,075 sq. ft. - excludes 1,407 sq. ft.
for 4 ft. perimeter setback

2 MINI PARK 1 0.702 AC (30,574 S.F.)
MINI PARK 2 0.421 AC (18,332 S.F.)
COURTYARD 12 (B1)
COURTYARD 13 (B3) ELEMENT #5 - FAMILY PICNIC AREA
ELEMENT #6 - GAME, FITNESS AREA 21,348 sq. ft. - excludes 3,199 sq. ft. for 4 ft. perimeter setback
33,936 sq. ft. - excludes 3,711 sq.
ft. for 4 ft. perimeter setback
COURT
13 COURT
13 COURT
13 COURT
12 COURT
12 COURT
15 COURT
14 COURTYARD 14 (B5)
4,504 sq. ft. - excludes 635 sq. ft.
for 4 ft. perimeter setback

ELEMENT #3 - LANDSCAPE & FURNISHED

PARK-LIKE QUIET AREA
*
NOTE:
* Public and Private area calculations are estimates at this time.

Final calculations are to be determined with the final design and is subject to Park Department confirmation.

TOTAL PARKS AND PRIVATE OPEN SPACE

4.225 AC + 4.222 AC = 8.447 AC
Figure 2.9-2: Park Credit Plan
20 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
21 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.10 Private Open Space
The Santa Clara Park Community is envisioned
as a dynamic neighborhood that embodies the
objectives of the Focus Area Plan. At the southern
end of the site is the community-scaled public
park, which connects to the City-spanning San
Tomas Aquino Creek Trail via a neighboring park.

The project consists of five residential “wrap”
buildings with an array of residential amenities.

Santa Clara Park features two distinctive
apartment communities to serve a broader base
of customers better while providing product
segmentation. These distinct communities are
separated by a new pedestrian-friendly internal
private street that will act as the residential
neighborhood’s focal point and social hub.

The community’s strong pedestrian character
is established by a series of defined open
spaces marked by architectural forms and
mature redwood trees. A tree-lined central
promenade from Mission College Blvd to
Freedom Circle is the primary pedestrian link
to the public park, passing through the heart of
the community and bisecting the new private
street. An interconnected network through
various courtyards provides outdoor recreation,
including pools, outdoor dining, seating, shade
structures, and play areas. The plan allows for
direct pedestrian and bicycle access to adjacent
neighborhoods.
8'
8'
8'
8'
8'
8'
8'
8'
30'
76'
38'
50'
10'
10'
14'
8'
51'-2"
46'-2"
77'-8"
47'-1"4'-0"
4'-0"
4'-0"
4'-0"
89'-3"
43'-7"
80'-9"
66'-2"
70'-10"
223'-1"
4'-0"
134'-0"
99'-9"
60'-8"
75'-0"
41'-10"
149'-1"
246'-11"
10'
47'-1"
4'-0"
46'-1"
55'-7"
25'-7"
46'-4" 81'-9"
43'-0"
79'-4"
4'-0"
45'-10"
45'-9"4'-0"
43'-3"
59'-7"4'-0"
43'-0"
38'-0"
36-0"55'-0"
SANTA CLARA PARK November 22, 2024 L107
MATCHLINE SEE SHEET L109
LANDSCAPE SITE PLAN (North Side)

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

EXISTING COMMERCIAL
(NOT A PART)
BLDG 1
BLDG 2
BLDG 3

EXISTING REDWOODS

ON MOUND
0 25 50 100
KEYMAP
COURTYARD 3:

PASSIVE COURTYARD

WITH OUTDOOR DINING

AND FLEX TURF SPACE
COURTYARD 1:

WITH LOUNGE SEATING,

FIREPIT AND FLEX TURF AREA
COURTYARD 4:
"FITNESS COURTYARD" WITH GROUP GATHERING
/ SOCIAL SPACE, AND FLEX TURF AREA
COURTYARD 5:

PASSIVE COURTYARD WITH BBQS,

DINING TABLES, AND LOUNGE SEATING

URBAN PLAZA WITH

SEATING, COMMUNAL

TABLES AND UMBRELLAS

URBAN STREETSCAPE WITH

STREET TREE AND FOCAL

TREE PLANTING
POOL
SPA

FLEX LAWN, RECLAIMED WOOD

BENCH SEATING, AND PICNIC
CHAISE
SPA

EDUCATIONAL GARDEN

ELEMENTS

PARK SPACE WITH MULTI-USE TURF AREA,

BENCH SEATING AND FAMILY PICNIC AREAS

SMALL SCULPTURAL / GAME PLAY

MULTI-USE TURF /

PICNIC AREA

GAME PLAY AREA WITH

TABLES / CHAIRS

PUBLIC SPACE WITH FLEX TURF,

PICNIC AREA AND BENCH SEATING

PASSIVE AREA WITH

BENCH SEATING

EXISTING REDWOODSEXISTING REDWOODS

PUBLIC SPACE WITH GAME PLAY

AREAS, COMMUNAL TABLES,

PICNIC AND GROUP GATHERING

PROPOSED RELOCATED REDWOOD

EXISTING ZELKOVA

EXISTING ZELKOVA

EXISTING ZELKOVA
NOTE:

ALL PUBLIC PARK PROGRAMMING IS SHOWN FOR
REFERENCE ONLY. PARK DESIGN AND PROGRAMMING

WILL BE VETTED AND CONFIRMED THROUGH MEETINGS

WITH THE CITY OF SANTA CLARA AND COMMUNITY

ENGAGEMENT PER THE CITY'S GUIDELINES

FOR MORE INFORMATION REGARDING PROPOSED

PROGRAMMING FOR THE PUBLIC PARK SPACES, PLEASE
REFER TO SHEETS L113 - L121

GROUP FITNESS AREAS
8' WIDE SIDEWALK
8' WIDE SIDEWALK
8' WIDE SIDEWALK
8' WIDE SIDEWALK
8' WIDE SIDEWALK
LOUNGE
CHAISE
LOUNGE
CHAISE
LOUNGE

LOADING ZONE

RECLAIMED WOOD

BENCH SEATING

FITNESS /

STRETCHING AREAS

RECLAIMED WOOD

BENCH SEATING

RECLAIMED WOOD

BENCH SEATING

RECLAIMED WOOD

BENCH SEATING

URBAN STREETSCAPE WITH

STREET TREE AND FOCAL

TREE PLANTING

LEGEND - ARCHITECTURE

RESIDENTIAL UNITS

AMENITY / COMMON AREAS

BUILDING ENTRY / EXIT LOCATIONS

LOADING ZONELOADING ZONE

LOADING ZONE

LOADING ZONE

LOADING ZONE
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)

PARK SPACE WITH TABLES

FOR GAME OR SMALL

GROUP GATHERING

FITNESS / STRETCHING EQUIPMENT

ENTRY PLAZA TO LINEAR PARK
COURTYARD 2:

WITH BBQ, DINING TABLES,

LOUNGE SEATING, FIREPIT

AND FLEX TURF AREA
POOL AREA 1:

WITH LARGE POOL, SPAS,

CABANAS, DINING TRELLIS

WITH BBQ, LOUNGE SEATING,

AND FIREPIT
COURTYARD 6:

PASSIVE COURTYARD WITH BBQ, DINING TABLES,

LOUNGE SEATING AND FLEX TURF AREA
COURTYARD 7:

PASSIVE COURTYARD WITH BBQ, DINING

TABLES, LOUNGE SEATING AND FLEX TURF AREA
COURTYARD 8:

WITH BBQ, DINING TABLES,

LOUNGE SEATING AND FIREPIT
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E)
Figure 2.10-1: Landscape Site Plan (North Side)
22 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
8'
10'
25'
8'
8'16'
10'
47'-1"
65'-9"
5'-4"
4'-0"
60'-2"
107'-3"
147'-6"
66'-0"
45'-11"
8'
20'
84'-3"
42'-7"
65'-9"
14'-2"
34'-0"
4'-0"
4'-0"
4'-0"
4'-0"
64'-2"
109'-7"
116'-7"
120'-11"
201'-5"
SANTA CLARA PARK January 24, 2025 L108
MATCHLINE SEE SHEET L108
LANDSCAPE SITE PLAN (South Side)
0 25 50 100

FREEDOM CIRCLE

EXISTING COMMERCIAL
(NOT A PART)
BLDG 4

EXISTING REDWOODS
BLDG 5
BLDG 3BLDG 2

FREEDOM CIRCLE
KEYMAP
POOL
SPA

EXISTING REDWOOD

CHAISE LOUNGE

FAMILY PICNIC AREA WITH MULTI-USE

TURF AND GAME PLAY AREA

EXISTING REDWOODS

EXISTING REDWOODS

EXISTING REDWOODS ON MOUND

PROPOSED RELOCATED

REDWOODS

PASSIVE / MEDITATION AREA WITH

SCULPTURAL GARDEN ELEMENTS
8' WIDE SIDEWALK
8' WIDE SIDEWALK
8' WIDE SIDEWALK

NEIGHBORHOOD PARK
REFER TO SHEET L119 - L120

FOR PROPOSED PROGRAM

URBAN STREETSCAPE WITH

STREET TREE AND FOCAL

TREE PLANTING
NOTE:

ALL PUBLIC PARK PROGRAMMING IS SHOWN FOR
REFERENCE ONLY. PARK DESIGN AND PROGRAMMING

WILL BE VETTED AND CONFIRMED THROUGH MEETINGS

WITH THE CITY OF SANTA CLARA AND COMMUNITY

ENGAGEMENT PER THE CITY'S GUIDELINES

FOR MORE INFORMATION REGARDING PROPOSED

PROGRAMMING FOR THE PUBLIC PARK SPACES, PLEASE
REFER TO SHEETS L113 - L121

PRIVATE STREET

REFER TO NEXT PAGE
(SHEET L109)

CHAISE LOUNGE

URBAN PLAZA WITH

SEATING, COMMUNAL

TABLES AND UMBRELLAS

BIKE RACKS

GROUP FITNESS AND

STRETCHING AREAS

RECLAIMED WOOD

BENCH SEATING

GROUP FITNESS AND

STRETCHING AREAS

LOADING ZONE

GROUP FITNESS AND

STRETCHING AREAS

BENCH SEATING

FLEX LAWN

PUBLIC SPACE WITH GAME PLAY

AREAS, COMMUNAL TABLES,

PICNIC AND GROUP GATHERING

LOADING ZONE

LEGEND - ARCHITECTURE

RESIDENTIAL UNITS

AMENITY / COMMON AREAS

BUILDING ENTRY / EXIT LOCATIONS
POOL AREA 2:

WITH POOL, SPA, CABANAS,

DINING TRELLIS WITH BBQ,

LOUNGE SEATING, AND FIREPITS
COURTYARD 10:

WITH LANDSCAPED AND

FURNISHED PARK-LIKE

QUIET AREA
COURTYARD 11:

WITH BBQ, FAMILY PICNIC, LOUNGE

SEATING AND FLEX TURF
COURTYARD 12:

WITH BBQ, FAMILY PICNIC, LOUNGE

SEATING AND FLEX TURF
COURTYARD 9:

WITH BBQ, DINING TABLES,

LOUNGE SEATING, FIREPIT

AND FLEX TURF AREA
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)
(E) (E)
(E)
(E) (E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E)
(E) (E)
(E)
(E)(E)
(E) (E) (E) (E)
(E)
Figure 2.10-2: Landscape Site Plan (South Side)
23 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

PRIVATE STREET
(REFER TO FIGURE 3.2)

NEIGHBORHOOD PARK

FOR PROPOSE PROGRAM
(REFER TO FIGURE 2.9-1)
SANTA CLARA PARK November 22, 2024 L111PROJECT LANDSCAPE CONCEPT DESIGN IMAGERY

INTERIOR COURTYARDS

GRAND POOL AREA

FITNESS POOL AREA
Figure 2.10-3: Landscape Concept Design Imagery
24 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
SANTA CLARA PARK November 22, 2024 L112PROJECT LANDSCAPE CONCEPT DESIGN IMAGERY

URBAN PLAZAPRIVATE INTERIOR STREET
Figure 2.10-4: Landscape Concept Design Imagery
25 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
26 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.11 Sustainability
The project would support sustainability through
incorporation of the following City Climate Action
Plan measures:
• Solar photovoltaic panels on the roofs of all
project buildings
• EV charging stations
• All-electric building construction (with
exceptions for gas hot water and pool
heaters, and BBQs/fire pits)
• Electric appliances and electric mechanical
systems and equipment
• Secure bike parking, including outlets for
charging electric bikes.

Additional sustainability design elements would
include reuse of salvageable building materials
and use of carbon-smart building materials;
integration of natural stormwater systems at
the site to reduce runoff and filter potential
stormwater pollutants; use of recycled water for
irrigation purposes; use of landscaping, green
infrastructure, and natural stormwater systems
to lower surface temperatures and reduce heat
gain; compliance with CalGreen Tier 1 energy
efficiency requirements; consistency with City
all-electric Reach codes, including the use of solar
photovoltaic panels on garage and residential
rooftops, electric vehicle charging stations (50
percent electric vehicle stall capacity), and all-
electric building construction (excepting hot
water systems and BBQ/fire pits); achievement
of LEED Gold equivalent sustainable design;
development of a TDM Program that reduces
VMT by 20 percent, including 10 percent from
TDM measures and 10 percent from physical
design features compliance with State solid
waste laws that reduce organic waste by 75
percent; and planting new trees possibly
exceeding city requirements.

Environmental
Features
Project sustainability features
include the following:
⤑ Photovoltaic (PV) Systems on roofs and garages
⤑ On-site tree relocation and preservation
⤑ LEED Gold Equivalent
⤑ High Efficiency Windows / HVAC Systems
⤑ All Electric / Energy Star Efficient Appliances
⤑ Electric heat pump space heating
⤑ Reclaimed water system
⤑ 20% Reduction in vehicle miles traveled
Figure 2.11: Environmental Features
27 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
28 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 03 | Streets
29 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 3 | Streets

3.1 Design Principles
Access to the project site is from Freedom Circle,
via Mission College Boulevard. Driveway access
to the project buildings would be provided as
follows:
• Building 1 – one driveway, via Freedom Circle
• Building 2 – one driveway via the new private
street (which connects to Freedom Circle)
• Building 3 – two driveways, both via the new
private street (which connects to Freedom
Circle)
• Building 4 – one driveway, via Freedom
Circle
• Building 5 – one driveway via the new private
street (which connects to Freedom Circle).

Additional circulation would be provided as
follows:
• A new 28-foot-wide two-way private street,
including Class ll bike lanes, roughly dividing
the project site into a northern half (Buildings
1, 2, and 3) and a southern half (Buildings
4 and 5); 6-foot pedestrian sidewalks are
located adjacent to both sides of the street,
with a landscape parkway in-between the
street and sidewalk. (Refer to Figure 3.1-1)
• A public pedestrian path between Buildings
1/2 and Building 3 from Mission College
Boulevard to the private street; between
Building 4 and Building 5 from the private
street to the park in the southeastern part of
the project site; and generally from west to
east and adjacent to Building 4 and Building
5 along the northern boundary of the park.
• A Class IV bike lane around the project site
perimeter (“Freedom Circle Bike Lane”).
(Refer to Figure 3.1-2, 3.1-3 and 3.1-4)
• A Class IV bike lane proposed for Mission
College Boulevard.

Loading zones would be provided for each
building. An on-site parking lot consisting of
15 stalls for the Neighborhood Park would be
provided in the park parcel. Final parking layout
for the proposed park is subject to Parks and
Traffic division review. The project proposes
three new crosswalks, two of which were already
proposed in the Freedom Circle Focus Area Plan.
30'
8'
10' 10'
5' 5' 8' 12'12'
30'
6' 6'
10' 10'
6' 6'
5' 5'
30'
8'
10' 10'
5'12'
8'5' 12'
14'5' 6'
6'
6'
6'
6'
6'
SANTA CLARA PARK November 22, 2024 L109PRIVATE STREET 'A' - PLAN AND SECTIONS 0 15 30 60
BLDG 2
BLDG 4
BLDG 5
BLDG 3

FREEDOM CIRCLE

FREEDOM CIRCLE
FUTURE

PUBLIC PARK
(NOT APART)
GARAGE

ENTRY / EXIT
GARAGE

ENTRY / EXIT
GARAGE

ENTRY / EXIT
GARAGE

ENTRY / EXIT

LOADINGLOADING

LOADING

POOL AREA

PARKWAY STRIP WITH

STREET TREES

SIDEWALK

VEHICULAR DRIVE AISLE

ENHANCED PAVERS

WITHIN THE STREET

ACTIVATED CENTRAL PLAZA HUB

WITH ACCENT PAVING, SEATING

AND UMBRELLAS

ACTIVATED CENTRAL PLAZA HUB

WITH ACCENT PAVING, SEATING

AND UMBRELLAS

REMOVABLE BOLLARDS ALONG

STREET EDGE

PARKWAY STRIP WITH

STREET TREES

SIDEWALK

VEHICULAR DRIVE AISLE

SECTION - PRIVATE STREET 'A' AT PARKWAY CONDITION
A SCALE: 1" = 10'-0"

SECTION - PRIVATE STREET 'A' AT LOADING ZONE
B SCALE: 1" = 10'-0"

SITE PLAN ENLARGEMENT
A B
KEYMAP

PEDESTRIAN CONNECTION FROM
MISSION COLLEGE BLVD. TO THE

PUBLIC PARK

PEDESTRIAN CONNECTION FROM
MISSION COLLEGE BLVD. TO THE

PUBLIC PARK

FLASHING BEACON AT EACH CROSSWALK

TRUNCATED DOMES AT EACH CROSSWALK

LOADINGRIDESHARE

CLASS II BIKE LANES ON

BOTH SIDES OF STREET

CLASS II BIKE LANES ON

BOTH SIDES OF STREET
Figure 3.1-1: Private Street- Plan and Sections
30 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 3 | Streets
SANTA CLARA PARK January 24, 2025 L104
Legend

COMPLETE STREETS - OVERALL DIAGRAM

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

FREEDOM CIRCLE
FUTURE

PUBLIC PARK
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)
BLDG 1
BLDG 2 BLDG 3
BLDG 5
BLDG 4
Type A Street Condition
0 50 100 200
(Attached Sidewalk)
Type B Street Condition
(Detached Sidewalk)
(28%)
(72%)
Garage Entry

NEIGHBORHOOD
PARK

HICHBORN DRIVE
L105
B
L105
A
Figure 3.1-2: Complete Street- Overall Diagram
31 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 3 | Streets
B

FREEDOM CIRCLE - COMPLETE STREETS

CONDITION TYPE B (DETACHED SIDEWALK)
8'-0"

CLASS IV

BIKE LANE
11'-0"

TRAVEL LANE
12'-0"

CENTER TURN LANE
11'-0"

TRAVEL LANE
8'-0"

CLASS IV

BIKE LANE

SIDEWALK
8'-0" MIN.

PARKWAY
7'-0" MIN.

SIDEWALK

LANDSCAPE (SLOPE)
VARIES

SANTA CLARA PARK

DEVELOPMENT
A

FREEDOM CIRCLE - COMPLETE STREETS

CONDITION TYPE A (ATTACHED SIDEWALK)
8'-0"

CLASS IV

BIKE LANE
11'-0"

TRAVEL LANE
12'-0"

CENTER TURN LANE
11'-0"

TRAVEL LANE
8'-0"

CLASS IV

BIKE LANE

SIDEWALK
7'-0" MIN.

SIDEWALK

LANDSCAPE WITH EXISTING BERM / REDWOODS
VARIES

SANTA CLARA PARK

DEVELOPMENT
SANTA CLARA PARK January 24, 2025STREET CONDITION L

FREEDOM CIRCLE

SANTA CLARA PARK

DEVELOPMENT

FREEDOM CIRCLE

SANTA CLARA PARK

DEVELOPMENT
09 M a y 2 02 4

SANTA CLARA PARK
I r v i n e Compan y Apar t men t De v e lopm e n t
COMPLETE STREETS EXHIBIT 201050
Figure 3.1-3: Complete Street Exhibit - Sections
32 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 3 | Streets
33 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 04 | Design Guidelines
& Standards
34 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards

4.1 Massing and Architecture
Santa Clara Park Apartment Community is
envisioned as a dynamic neighborhood that
embodies the objectives of the Focus Area
Plan. At the southern end of the site is the
community-scaled public park, which connects
to the City-spanning San Tomas Aquino Creek
Trail via a neighboring park. The project consists
of five residential “wrap” buildings of Type III
construction featuring 1,792 apartment homes
with an array of residential amenities. Santa
Clara Park features two distinctive apartment
communities to serve a broader base of
customers better while providing product
segmentation. These distinct communities are
separated by a new pedestrian-friendly internal
private street that will act as the residential
neighborhood’s focal point and social hub.

The community’s strong pedestrian character
is established by a series of defined open
spaces marked by architectural forms and
mature redwood trees. A tree-lined central
promenade from Mission College Blvd to
Freedom Circle is the primary pedestrian link
to the public park, passing through the heart of
the community and bisecting the new private
street. An interconnected network through
various courtyards provides outdoor recreation,
including pools, outdoor dining, seating, shade
structures, and play areas. The plan allows for
direct pedestrian and bicycle access to adjacent
neighborhoods.

Each building is classically composed and
proportioned in Mediterranean architectural
styles. Large storefront details and modulated
eave lines highlight entry points. Colors and
materials highlight variations and textures. Open
landscaped courtyards and setbacks articulate
the buildings. Large redwoods along perimeter
building edges screen views, lessening the
perception of building scale. All five buildings are
configured to completely conceal the vertically
structured parking.

On the north side of the private street, “Building 1”
consists of 362 units in Type III construction and
500 parking spaces. “Building 2” has 341 units
in Type III construction and 474 parking spaces.
“Building 3” consists of 536 units in Type III
construction and 728 parking spaces. Buildings
1, 2, and 3 provide smaller, more affordable unit
sizes than Buildings 4 and 5.

On the south side of the private street, “Building
4” consists of 292 units in Type III construction
with 398 parking spaces, and “Building 5”
provides 261 units in Type III construction with
359 parking spaces.

Each building has a Type IIA construction
garage surrounded by a Type III construction
residential building. The proposed project has
approximately 2,459 parking spaces within
five Type IIA construction garages, totaling
approximately 1,017,750 GSF.

The following exhibits are conceptual and will be
finalized through the city’s Architectural Review
Process.

EAVE PROFILE DOOR SURROUND & WAINSCOT DETAIL

TRIM BAND PROFILE & ENHANCED PLASTER RAILING DETAIL
STYLE 1: FORMAL ITALIAN
35 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 1: FORMAL ITALIAN PALETTE
STYLE 1: FORMAL ITALIAN
PLASTER BODY - 1 PLASTER B

PLASTER BODY (VERTICAL INFILL)

SANTA CLARA PARK / EXTER

FORMAL ITALIAN / PRELIM C
BODY COLOR 1
BODY COLOR 2
BODY COLOR 3

ROOF TILE COLOR
PLASTER BODY - 1 PLASTER BODY - 2 PLASTER BODY - 3 PLASTER BODY - 4 PLASTER BODY - 5

PLASTER BODY (VERTICAL INFILL) FOAM TRIM PROJECT METAL PPG 1022-6 ‘GRANITE”
SANTA CLARA PARK / EXTERIOR COLOR/ IRVINE COMPANY 8.12.24

FORMAL ITALIAN / PRELIM COLOR CONCEPT
PLASTER BODY - 1 PLASTER BODY - 2 PLASTER BODY - 3 PLASTER B

PLASTER BODY (VERTICAL INFILL) FOAM TRIM

SANTA CLARA PARK / EXTERIOR COLOR/ IRVINE COMPANY

FORMAL ITALIAN / PRELIM COLOR CONCEPT
36 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 1: FORMAL ITALIAN PALETTE

FLAT PARAPET ROOF DOOR SURROUND & WAINSCOT DETAIL

TRIM BAND PROFILE WINDOW GROUPING AND PANEL
STYLE 2: MODERN PALAZZO
37 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 2: MODERN PALAZZO PALETTE
BODY COLOR 1
BODY COLOR 2
BODY COLOR 3

TRIM COLOR
STYLE 2: MODERN PALAZZO COLOR SCHEME A
PLASTER BODY - 1

PLASTER BODY (VERTICAL INF

MODERN PALAZZO /
PLASTER BODY - 1 PLASTER BODY - 2 PLASTER BODY - 3

SANTA CLARA PARK / EXTERIOR COLOR/ IRVINE COMPANY

MODERN PALAZZO / PRELIM COLOR CONCEPT / NEUTRAL
PLASTER BODY - 1 PLASTER BODY - 2

SANTA CLARA PARK / EXTERIOR COLOR/ I

MODERN PALAZZO / PRELIM COLOR CON
PLASTER BODY - 1 PLASTER BODY - 2 PLASTER

SANTA CLARA PARK / EXTERIOR COLOR/ IRVINE

MODERN PALAZZO / PRELIM COLOR CONCEPT
38 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 2: MODERN PALAZZO PALETTE COLOR SCHEME A
BODY COLOR 1
BODY COLOR 2
BODY COLOR 3

TRIM COLOR
STYLE 2: MODERN PALAZZO COLOR SCHEME B
PLASTER BODY - 1 PLAS

PLASTER BODY (VERTICAL INFILL

SANTA CLARA PARK / EXT

MODERN PALAZZO / PRE
PLASTER BODY - 1 PLASTER BODY - 2

SANTA CLARA PARK / EXTERIOR COLOR/

MODERN PALAZZO / PRELIM COLOR CON
PLASTER BODY - 1 PLASTER BODY - 2 PLASTER BODY - 3

SANTA CLARA PARK / EXTERIOR COLOR/ IRVINE COMPANY

MODERN PALAZZO / PRELIM COLOR CONCEPT / GOLD PALETTE
PLASTER BODY - 4
PLASTER BODY - 1 PLASTER BODY - 2 PLASTER BODY -

SANTA CLARA PARK / EXTERIOR COLOR/ IRVINE COMP

MODERN PALAZZO / PRELIM COLOR CONCEPT / GOL
39 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 2: MODERN PALAZZO PALETTE COLOR SCHEME B
24” OVERHANG WITH DECORATIVE RAFTER TAILS DOOR SURROUND TRIM & FIRED CLAY BRICK

TRELLIS DETAILS ORNAMENT RAILING DETAIL
STYLE 3: FORMAL SPANISH
40 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 3: FORMAL SPANISH PALETTE
BODY COLOR 1
BODY COLOR 2
BODY COLOR 3

ROOF TILE COLOR
STYLE 3: FORMAL SPANISH

SANTA CLARA PARK / EXTERIOR COLOR/ IRVIN

FORMAL SPANISH / PRELIM COLOR CONCEPT
PLASTER BODY - 1 PLASTER BODY - 2 PLAS

PLASTER BODY (VERTICAL INFILL) FOAM TRIM

PLASTER BODY - 1 PLASTER

PLASTER BODY (VERTICAL INFILL)

SANTA CLARA PARK / EXTERIOR COLOR/ IRVINE COMPANY

FORMAL SPANISH / PRELIM COLOR CONCEPT
PLASTER BODY - 1 PLASTER BODY - 2 PLASTER BODY - 3 PLAS

41 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 3: FORMAL SPANISH PALETTE
15” OVERHANG WITH DECORATIVE RAFTER TAILS TRANSOM MASSING ELEMENT

DECORATIVE FINIAL ELEGANT RAILING DETAIL
STYLE 4: PALLADIAN
42 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 4: PALLADIAN PALETTE
BODY COLOR 1
BODY COLOR 2
BODY COLOR 3

ROOF TILE COLOR
STYLE 4: PALLADIAN

PLASTER BODY PLASTE

PLASTER BODY (VERTICAL INFILL)

SANTA CLARA PARK / EXTE

PALLADIAN / PRELIM COL

PLASTER BODY PLASTER BODY P

SANTA CLARA PARK / EXTERIOR COLOR/ IR

PALLADIAN / PRELIM COLOR CONCEPT

PLASTER BODY PLASTER BODY PLASTER BODY

SANTA CLARA PARK / EXTERIOR COLOR/ IRVINE COMPANY

PALLADIAN / PRELIM COLOR CONCEPT
43 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards
STYLE 4: PALLADIAN PALETTE
SEC. 602.2 TYPE I AND II CONSTRUCTION ARE THO

CONSTRUCTION IN WHICH THE BUILDING ELEMENT
601 ARE OF NONCOMBUSTIBLE MATERIALS, EXCEP
SECTION 603 AND ELSEWHERE IN THIS CODE.

CHAPTER 6 TYPES OF CONSTRUCTION CLASSIFICATION
SEC. 602.3:TYPE III CONSTRUCTION IS THAT CONSTRUCTION IN WHICH THE EXTERIOR

WALLS ARE OF NON COMBUSTIBLE MATERIALS AND THE INTE RIOR BUILDING ELEMENTS ARE OF ANY MATERIAL PERMITTED BY THIS CODE. FIRE RETARDANT-TREATED WOOD FRAMING COMPLYING WITH SECTION 2303.2 SHALL BE PERMITTED WITHIN EXTERIOR WALL ASSEMBLIES OF A 2-HOUR RATING OR LESS.

BUILDING
1 1
1 2
2 2

3 3
3 4
4 5
5 Common Recreation Space (per unit) 65 GSF/ Unit
Private Recreation Space 25 GSF/ Unit
Recreation Space for Multi-family Dwellings (minimum) measured in square feet per dwlling unit Allowable Density 51 - 100 du/acre
Gross Residential Density (minimum to maximum) shown in number of dwelling units per acre Number of Stories (all other zones) 10
Number of Stories (maximum)
Height (all other zones) 100'
Height (within 20 feet of the R1-6L, R1-8L and R2... 32' Height (maximum) measured in front
Office (front, side corner and interior) 0'
Mixed-Use (front, side corner and interior) 0'
Residential (front, side corner and interior) 10'
Setbacks (minimum) - Setback lines are measured from the back of walk Parcel Area (greater than 10,000 sq.ft.) None
Parcel Area (less than 10,000 sq.ft.) None
Structural Coverage (Maximum percentage)
Street Frontage (feet) 70
Parcel Area 10,000
Parcel Area (minimum) are required for each NEWLY CREATE parcel. (minimum unless otherwise indicated)
Development Feature Santa Clara Park
Figure 4.2: Development Matrix
44 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards

4.2 Development Standards

YPE I AND II CONSTRUCTION ARE THOSE TYP ES OF

ON IN WHICH THE BUILDING ELEMENTS LISTED IN TABLE

NONCOMBUSTIBLE MATERIALS, EXCEPT AS PERM ITTED IN
3 AND ELSEWHERE IN THIS CODE.

TOTAL
LEVEL 1
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5

BUILDING AREA
TOTAL
RETAIL

LEASING

AMENITY

AMENITY AREA

TOTAL

2-BEDROO
1+DEN

RESIDENTIAL PARKING REQUIRED & PROVIDED

BUILDING

UNIT TYPE COUNT

RESIDENTIAL

PARKING
FACTOR

REQUIRED

RESIDENTIAL
STALLS

PROVIDED

RESIDENTIAL

PARKING
1 1 BEDROOM 79 1 79
1 2 BEDROOM 138 2 276
1 STUDIO 145 1 145
362 500
2 1 BEDROOM 68 1 68
2 2 BEDROOM 133 2 266
2 STUDIO 140 1 140
341 474
3 1 BEDROOM 120 1 120
3 2 BEDROOM 192 2 384
3 STUDIO 224 1 224
536 728
4 1 BEDROOM 186 1 186
4 2 BEDROOM 106 2 212
292 398
5 1 BEDROOM 163 1 163
5 2 BEDROOM 98 2 196
261 359
1792 2459

dwlling unit

ts per acre

500
474
728
398
359
2459
Figure 4.3: Parking Matrix
45 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards

4.3 Parking
ANTA CLARA PARK | JUNE 21, 2024DESIGN + OPERATIONS DIAGRAMS LAR CIRCULATION + GARAGE ACCESS LOADING AREAS
0’ 60’ 120’
N

RESIDENT/GUEST ACCESS

LOADING LOCATIONS

NEAREST LOBBY/CORE
536 DU
DU
261 DU

RIDESHARE PICK UP/DROP OFF
Figure 4.4-1: Loading Areas Diagram
46 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & Standards

4.4 Loading and Services
P3
P4 P5 P6 P7 P8 P9 P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
P1
P2
SC-T2-30WASTE
24'-11
5 8"22'-0"
SC
-T2-3
0 RE

CYCLING
55'-07 8"
46'
-0"
8'-3"
22'-1"
3'-6"
12'-31
4"
8'-3"
13'-83
4"
SHEET NOTES:

KEY PLAN. OVERALL SITE.

1. RESIDENTIAL TRASH: STAFF SHALL TRANSPORT CONTAINERS TO CENTRAL TRASH ROOM AT BUILDING 4 FOR EMPTYING WITH TAYLOR-DUNN BIGFOOT CARRIER.

2. ALL RESIDENTIAL TRASH TO BE COMMINGLED AT CENTRAL TRASH ROOM ROLL-OFF COMPACTORS.

GENERAL NOTES.

1. ANY DESIGNS OR SOLUTIONS SHOWN IN DRAWING, EITHER DIRECT OR IMPLIED,

ARE HEREBY CLARIFIED AS EXAMPLES AND SHALL NOT BE CONSIDERED COMPLETE DESIGNS FOR CONSTRUCTION. THESE DRAWINGS ARE INTENDED TO SUPPLEMENT THE SUBMITTAL PACKAGE FROM ARCHITECT.

2. ANY PARTIAL INFORMATION, OMISSIONS, OR INACCURATE DESCRIPTIONS OF

WORK SHOWN IN DRAWINGS, WHICH ARE NECESSARY TO PERFORM THE SCOPE OF WORK, SHALL NOT RELIEVE THE CONTRACTOR FROM COMPLETION OF WORK.

ALL WORK SHALL BE PERFORMED TO SATISFY THE MINIMUM REQUIREMENTS OF THE CURRENT APPLICABLE BUILDING CODES.

3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO START OF CONSTRUCTION. THE ARCHITECT SHALL BE PROMPTLY NOTIFIED OF ANY INCONSISTENCIES AND/OR DISCREPANCIES.

LEGEND:

STAFF PATH OF TRAVEL FROM RESIDENTIAL TRASH ROOMS AT
BUILDING 1-5 TO CENTRAL TRASH ROOM AT BUILDING 4.

RED HATCH INDICATES RESIDENTIAL
TRASH ROOMS IN BUILDINGS 1-5, TYP
(16 TOTAL RESIDENTIAL TRASH ROOMS)

ROLL-OFF COMPACTORS

AT CENTRAL TRASH ROOM

STAFF PATH OF TRAVEL FROM

RESIDENTIAL TRASH ROOMS AT
BUILDINGS 1-5 TO CENTRAL
TRASH ROOM AT BUILDING 4
55'-0
7 8"
20 '-0"
32'-61
8"
15'-818"
17'-4
7 8"25'-7"

SANTA CLARA PARK
0'

AMERICAN TRASH MANAGEMENT
1900 POWELL STREET, SUITE 220
EMERYVILLE, CALIFORNIA 94608
P: 415.292.5400
F: 415.292.5410
[email protected]
Figure 4.4-2: Trash Compactor Plan
47 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 4 | Design Guidelines & StandardsP3
P4 P5 P6 P7 P8 P9 P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20
P21
P22
P23
P1
P2
SC-T2-30WASTE
24'-115
8"22'-0"
SC-T2-30

RECYCLING
55'-0
7 8"
46'
-0"
8'-3
"
22'-1"
3'-6"
12'-31
4"
8'-3"
13'-83
4"
SHEET NOTES:

KEY PLAN. OVERALL SITE.

1. RESIDENTIAL TRASH: STAFF SHALL TRANSPORT CONTAINERS TO CENTRAL TRASH ROOM AT BUILDING 4 FOR EMPTYING WITH TAYLOR-DUNN BIGFOOT CARRIER.

2. ALL RESIDENTIAL TRASH TO BE COMMINGLED AT CENTRAL TRASH ROOM ROLL-OFF COMPACTORS.

GENERAL NOTES.

1. ANY DESIGNS OR SOLUTIONS SHOWN IN DRAWING, EITHER DIRECT OR IMPLIED,

ARE HEREBY CLARIFIED AS EXAMPLES AND SHALL NOT BE CONSIDERED COMPLETE DESIGNS FOR CONSTRUCTION. THESE DRAWINGS ARE INTENDED TO SUPPLEMENT THE SUBMITTAL PACKAGE FROM ARCHITECT.

2. ANY PARTIAL INFORMATION, OMISSIONS, OR INACCURATE DESCRIPTIONS OF

WORK SHOWN IN DRAWINGS, WHICH ARE NECESSARY TO PERFORM THE SCOPE OF WORK, SHALL NOT RELIEVE THE CONTRACTOR FROM COMPLETION OF WORK.

ALL WORK SHALL BE PERFORMED TO SATISFY THE MINIMUM REQUIREMENTS OF THE CURRENT APPLICABLE BUILDING CODES.

3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO START OF CONSTRUCTION. THE ARCHITECT SHALL BE PROMPTLY NOTIFIED OF ANY INCONSISTENCIES AND/OR DISCREPANCIES.

LEGEND:

STAFF PATH OF TRAVEL FROM RESIDENTIAL TRASH ROOMS AT
BUILDING 1-5 TO CENTRAL TRASH ROOM AT BUILDING 4.

ENTIAL
5, TYP
OOMS)
CTORS
ROOM
FROM
MS AT
NTRAL
DING 4
55'-07 8"
20 '-0"
32'-61
8"
15'-818"
17'-
47 8"25'-7"
0'
48 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 05 | Infrastructure & Utilities
49 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 5 | Infrastructure & Utilities

5.1 Infrastructure & Utilities
A review of the Freedom Circle Focus Area Plan
(FCFAP) and discussions with City/Agency staff
indicate that there will be connection points to
existing utility mains in the city right-of-way, as
described below.

Sanitary Sewer: City block maps indicate
that two separate 12” mains run the length of
Freedom Circle (E & W), both connecting to
the 12” main running westwards on Mission
College Boulevard, per the FCFAP EIR and the
future project-specific Development Impact
Analysis (DIA). It is our understanding that there
will be no upsizing of the 12” VCP main running
between Freedom Circle (W) and Great America,
and no upsizing required along the immediate
project frontage, which is not anticipated in the
full build-out condition in the Freedom Circle
Focus Area EIR.

Storm Drain: City block maps indicate there is
a 24” main that begins south of the Hichborn/
Freedom Circle (W) intersection. This 24” main
runs south, then east, and loops back north
along Freedom Circle (E) and increases to 54” .

It turns east into the Freedom Circle Storm
Drain Pump Station at the southeast corner of
the Freedom Circle (E)/Agnew/Mission College
intersection, just north of the Greystar project
site. There is a 15” main located in Mission
College that begins just west of Agnew and
travels west towards Great America. A 12” main
existing in the Hitchborn/Freedom Circle (W)
intersection heads north and increases to an 18”
main before connecting to the existing main in
Mission College.

The existing site consists mainly of impervious
surfaces, such as parking lots, on-site sidewalks,
and buildings. The proposed project will increase
the pervious area on-site and provide LID
stormwater treatment areas and source control
measures, decreasing the stormwater runoff
from the project site into the city mains.

Water: Per City block maps, there is a 12” main
(installed in 1975) that runs through the northern
side of Mission College. In addition, there is a 12”
main (installed in 1977) that loops Freedom Circle
(E & W) and connects to the Mission College
main at both intersections. An abandoned 12”
main (installed in 1970) exists within the project
boundary, running east-west approximately in
line with Hichborn Drive, which will either be
removed or remain in place if it doesn’t impact
the proposed project improvements. The project
will replace the existing water main with a
proposed ductile iron pipe main from Freedom
Circle (W) & Mission College to the new ductile
iron pipe main in Freedom Circle (E) constructed
as a part of the Greystar Development.

Should the Greystar Development water main
improvements not occur, the project will extend
this water main replacement back to Mission
College & Freedom Circle (E).

The FCFAP EIR included a Water Supply
Assessment (WSA) for the full build-out of the
FCFAP. Per the approved EIR and WSA, and as
city code requires, the project intends to utilize
recycled water as an alternative to potable water
for irrigation and dual plumbing (where feasible)
to alleviate the overall project demand for potable
water. As listed in the conclusion of the WSA
of the FCFAP EIR, the proposed development
anticipates the possibility of fair-share water
supply or capacity fees, additional water
efficiency standards, and the establishment of
annual project water budgets.

Recycled Water: Per City block maps, a 12”
main (installed in 1998) runs along the southern
side of Mission College. No recycled water main
facilities are currently available in Freedom
Circle. Where new recycled water laterals are
required, the project will construct and extend a
new 8” recycled water main from the connection
point to Mission College.

Electric: The project is bound by existing
Silicon Valley Power (SVP) facilities within
Freedom Circle (E & W) on the east, south, and
west within Mission College Blvd on the North.

SVP is anticipating tying the project services
into existing facilities located west, north, and
south of the project boundary. Relocation of
existing electric infrastructure along the project
frontage may be required. Some SVP equipment
(conduits, manholes, vaults, etc.) may remain to
serve properties on the opposite side of Freedom
Circle & Mission College. Approximate unit
counts have been provided to SVP for reference.

SVP system impact study was completed and it
is expected that the project will make a fair share
contribution to the Agnew substation expansion.

Gas: The current parcel is served by PG&E
low-pressure service lines connected to a high-
pressure distribution main on the opposite side
of Freedom Circle and Mission College Blvd.

Approximately ten (10) gas meter services will
be removed and capped at the high-pressure
distribution main within Freedom Circle (E &
W) and Mission College. The high-pressure
distribution lines can serve as future gas tie-in
locations. Although individual gas metering of
residential units is not allowed in the city code,
there are provisions for new gas services for
various types of housing facilities.
50 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 06 | Public Services
51 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 6 | Public Services

6.1 Public Services
Fire Protection and Emergency Medical
Service:

The Santa Clara Fire Department (SCFD) has ten
fire stations (one of which temporarily closed in
March 2020 and is scheduled for replacement
and relocation), with eight fire engines, two
ladder trucks, one rescue unit, two ambulances,
one hazardous materials unit, and one command
vehicle. The Plan Area would be served by
Station 8, which is located at 2400 Agnew Road.

Secondary responding stations to the area would
be Station 6, located at 888 Agnew Road; Station
9, located at 3011 Corvin Drive; and Station 5,
located at 1912 Bowers Avenue. The Freedom
Circle Focus Area Plan does not propose new or
expanded fire protection/EMS facilities.

The Santa Clara Park (SCP) project site is located
in the southern portion of the Plan Area and also
would be served by Station 8, which is about 285
feet northeast of the project site, across Mission
College Boulevard on Agnew Road. Station 6
is less than one mile from the project site, and
Station 9 is slightly more than one mile from the
project site, depending on the route taken.

Police Protection:

The Santa Clara Police Department (SCPD) is
located at 601 El Camino Real. The Northside
Substation, at 3992 Rivermark Parkway, is
a satellite facility with limited hours. SCPD
operations are broken into six beats; Beats 1
through 5 are south of U.S. 101, and Beat 6 covers
the entire city area north of U.S. 101 plus the area
between the Central Expressway and U.S. 101.

The Plan Area is in Beat 6, and the project site
is also in Beat 6. The Focus Area Plan does not
propose new or expanded police facilities.

Public Schools:

The Plan Area, including the proposed SCP
project, is in the Santa Clara Unified School
District (SCUSD). The SCUSD is comprised of
27 schools, seven of which are located north of
U.S. 101, including five elementary schools, two
middle schools, and one high school. The Focus
Area Plan does not propose new or expanded
school facilities.

Parks:

City park and recreational facilities are comprised
of approximately 268 improved acres and 85
unimproved acres. There are no public parks
or recreational facilities currently in the Future
Focus Area Plan Area, including the project site
which contains 12 existing on-site buildings but
no parks or recreational facilities. The Focus
Area Plan calls for providing public parkland and
privately-owned public open space, consistent
with the general plan requirements and other
city regulations, and provision of open space or
payment of in‐lieu fees for parks and open space
for residential development, consistent with the
City’s Parkland Dedication Ordinance.

Other Public Facilities:

The City has three libraries: (1) Central Park
Library; (2) the Northside Branch Library; and
(3) the Mission Branch Library. The City also
operates four community centers. The Focus
Area Plan does not propose new or expanded
public facilities.
52 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 6 | Public Services

6.2 Impact to Public Services
Impact to Fire Protection and Emergency
Medical Service:

The SCP project would result in the construction
of 1,792 dwelling units. This total is less than the
2,500 remaining units evaluated in the 2022 EIR
and would require fewer additional fire service/
EMS staff than projected in the 2022 EIR. As
discussed above, the 2022 EIR concluded that
no significant impact was identified related to
fire protection/EMS, no new or expanded fire
protection/EMS facilities were needed, and no
mitigation would be required. Because the total
number of units proposed for the SCP project
is less than the number of units evaluated for
the Focus Area Plan, the environmental effects
related to fire protection/EMS resulting from the
SCP project would be reduced in scale. The
SCP project’s impact related to fire protection/
EMS would remain less than significant as
identified in the 2022 EIR.

Impact to Police Protection:

The SCP project would result in the construction
of 1,792 dwelling units. This total is less than the
2,500 remaining units evaluated in the 2022 EIR
and would require fewer additional police staff
than projected in the 2022 EIR. As discussed
above, the 2022 EIR concluded that no significant
impact was identified related to police services,
no new or expanded police facilities were
needed, and no mitigation would be required.

Because the total number of units proposed for
the SCP project is less than the number of units
evaluated for the Focus Area Plan, environmental
effects related to police services resulting from
the SCP project would be reduced in scale. The
SCP project’s impact related to police services
would remain less than significant as identified
in the 2022 EIR.

Impact to Parks:

The project would result in the construction of
1,792 dwelling units. This total is less than the
2,500 remaining units evaluated in the 2022 EIR
and would result in fewer new residents using
city parks than projected in the 2022 EIR. As
discussed above, the 2022 EIR concluded that
no significant impact was identified related
to parks, new parkland and/or payment of in-
lieu park dedication fees would be required of
all new development in the Future Focus Area
Plan Area, and the City’s park improvements
ordinance would provide adequate mitigation.

Because the total number of units proposed for
the SCP project is less than the number of units
evaluated for the Focus Area Plan, environmental
effects related to parks resulting from the SCP
project would be reduced in scale. The SCP
project proposes approximately 6.336 acres of
public park and open space, including a 3.165-
acre neighborhood park (to be dedicated to the
city), plus an additional 2.111 acres of credit for
private open space and building amenities space.

The project would pay additional in-lieu park
improvement fees as determined in consultation
with the City’s Parks and Recreation Department
(The Parkland Dedication Requirement) to help
mitigate future parks impacts. The SCP project’s
impact related to parks would remain less than
significant as identified in the 2022 EIR.

Impact to 0ther Public Facilities:

The project would result in the construction of
1,792 dwelling units. This total is less than the
2,500 remaining units evaluated in the 2022 EIR
and would generate fewer new residents than
projected in the 2022 EIR. As discussed above,
the 2022 EIR concluded that no significant impact
was identified related to other public facilities,
and no new or expanded public facilities were
being proposed by the City. Because the total
number of units proposed for the SCP project
is less than the number of units evaluated for
the Focus Area Plan, the environmental effects
related to other public facilities resulting from the
SCP project would be reduced in scale. The SCP
project’s impact related to other public facilities
would remain less than significant as identified
in the 2022 EIR.
53 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 07 | Fiscal Analysis

7.1 Fiscal Analysis
54 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 7 | Fiscal Analysis

7.1 Fiscal Analysis
Fiscal Analysis has been added as an attachment
at the end of this document. See Attachment ‘A’
55 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 08 | Community Outreach

8.1 Public Participation
56 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 8 | Community Outreach
The project team deeply values the insights and
perspectives of the surrounding community and
local residents in shaping the vision for Santa
Clara Park. To foster collaboration, the team
hosted three widely advertised community
meetings, drawing over 150 attendees, including
community stakeholders and city leaders from
diverse regions and backgrounds.

In addition to these large gatherings, individual
meetings were conducted with key stakeholders
and community members to gather more
focused feedback on the project’s design and
implementation. There will also be additional
opportunities to provide input on the public park
design as a part of the City’s standard design
review process.

Key topics discussed with the Community:

Land Use and Density:
• 1,792 units, 25.7 acres, 70 DU/acre
Affordability:
• 15% on-site , 5% VL (50%AMI), 10%
(100%AMI) 67% of units affordable by design
Transportation and Parking:
• Regional Connectivity, Parking City
minimum parking ratio, Unbundled parking,
1:1 Bicycle parking/unit in garages
Preservation:
• Preservation of a large percentage of
existing redwood trees and relocation of
redwood trees, including salvage and reuse
where possible
Urban Design:
• Pedestrian-friendly design, Main street
serves as front door of new community,
Connectivity for pedestrians and bicyclists
Environmental - Sustainable Features:
• Photovoltaic systems on roofs and garages,
on-site tree relocation and preservation,
LEED Gold Equivalent, All Electric
Appliances, High efficiency windows /HVAC
systems, Electric Heat pump space heating,
Reclaimed Water system, 20% reduction in
VMT through TDM measures
Community Benefits
Project community benefits
include the following:
⤑ Publicly Accessible
⤑ New Public Parks
⤑ Bicycle Lane Extensions
⤑ Fair Share Traffic Improvements
⤑ School Fees
⤑ Electrical Substation Upgrades
⤑ Affordable Housing
Figure 8.1-1: Community Benefits
57 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 8 | Community Outreach
Community Input
Engaged with more than 150 local community
members and leaders through several
community meetings and property tours
Figure 8.1-2: Community Input
58 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 8 | Community Outreach
Figure 8.1-3: Community Outreach
59 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 8 | Community Outreach
60 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application A |Attachment

← All documents from this meeting