Cities Index.
FY 2025/26 Proposed Municipal Fee Schedule

City Council and Authorities Concurrent
April 29, 2025

Document
FY 2025/26 Proposed Municipal Fee Schedule
Meeting
April 29, 2025
Body
City Council and Authorities Concurrent
Original file
10.7 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

Page
2 5
1 – 1
2 – 1
3 – 1
4 – 1
5 – 1
6 – 1
7 – 1
8 – 1
9 – 1
10 – 1
11 – 1
12 – 1
13 – 1
14 – 1
15 – 1
16 – 1
17 – 1
18 – 1

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Table of Contents
Finance…………………………………….……………………………………………...........…………………………………… Reader’s Guide……………………………………………………………………………………………………............................

List of Separately Published Fee Schedules……………………………………………….......................................................

Fees Included in this Document:

Citywide………………………………………………………………………………………………….…………………………… City Clerk……………………………………………………………………………………………………………………………… City Manager………………………………………………………………………..........……………………….………………… Community Development:

Building…………………………………………………………………………………………………………………….……… Housing and Community Services…………………………………………………………….……………………….……… Planning…………………………………………………………………………………………..……………………….……… Electric Utility………………………………………….……………………………………………...........………………………… Resolution………………………………………………………………………………………………………………………………… Fire………………………………………………………………………………………………………………………………….… Library……………………………………………………………………………………………………..……………………….… Parks and Recreation:

Cemetery………………………………………………………………………………………….……………………….……… Recreation………………………………………………………………………………………...……………………….……… Police……………………………………………………………………………………………………………………………….… Public Works:

Engineering……………………………………………………………………………………….……………………….……… Street……………………………………………………………………………………………………………………….……… Water and Sewer Utilities……………………………………………………………………………….……………………….… Alphabetical Listing by Fee……………………………………………………………………………………..……………………… 1 The purpose of this Reader’s Guide is to make the City of Santa Clara FY 2025/26 Municipal Fee Schedule easier to review. The Reader’s Guide highlights information contained in this document, defines terminology used in column headers, and briefly explains how voter approved Proposition 26 impacts the Schedule.

Fees, rates, and charges are intended to encompass all charges established by license, permit fees, utility charges, refuse collection and any other charges for goods and services and use of City-owned or operated facilities. Certain fees omitted from the Municipal Fee Schedule are published separately and noted on page V of this schedule. Such fees and charges published separately are unique because they are mandated by external agencies or because they receive special attention and review from City Council prior to adoption.

A comprehensive listing of the City’s fees, rates, and charges, arranged in sections by department make up the City of Santa Clara Municipal Fee Schedule. During an annual review, each department recommends appropriate adjustments after considering the total costs to the City for each service provided. Costs include (1) personnel time (providing the service and collecting data), (2) equipment used, (3) material, service and supply costs, (4) department and City-wide overhead, and (5) any other costs that may be incurred that are directly related to the specific fees, rates or charges. Periodically, the City will contract with an outside consultant to perform a comprehensive review/study of fees. For FY 2024/25, ClearSource Financial Consulting completed a Cost of Services (User Fee) Study.

For interim years, the majority of fees are generally proposed to increase by a cost-of-living adjustment, typically calculated as the most recent annual change in the regional consumer price index (CPI) or a change in the organization’s costs. The CPI change for the most recent year was 3.5%. This minor recalibration of fees is simply intended to maintain cost recovery levels consistent with the fees previously adopted by the City Council. In addition to the general inflationary changes proposed for fees, other cost-of-living adjustments implement specific inflators for certain fees, align with mandates, and provide further clarification.

Proposition 26
Proposition 26, passed by voters on November 2, 2010, is a constitutional amendment that introduces, for the first time, a definition of what constitutes a local tax:

As used in this section, “tax” means any levy, charge, or exaction of any kind imposed by a local government…

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reader's Guide
2 CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

1. 2.

3. 4.

5. 6.

7. All fees, rates, and charges have been reviewed by the City Attorney’s Office and meet one or more of the exceptions to Proposition 26, or are not subject to Proposition 26.

Special Benefit or Privilege: A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege.

Government Service or Product: A charge imposed for specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service

Reader's Guide (Cont'd.)
Licenses and Permits: A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof.

Local Government Property: A charge imposed for entrance to or use of local government property, or the purchase, rental or lease of a local government property.

Fines and Penalties: A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government, as a result of a violation of law.

Property Development: A charge imposed as a condition of property development.

The Prop 218 Exception: Provides that property assessment and property-related fees that are already subject to the approval requirements of Proposition 218 are not taxes. Common examples include water and sewer rates and special district assessments such as Landscape and Lighting District Act assessments.

Under this definition, many requirements imposed by a local government that results in the local government receiving revenues are considered local taxes. This means that local government would need to obtain majority approval of the voters if the revenues are to be used for general governmental purpose and by two-thirds of voters if used for a specific purpose. In contrast, a fee may be adopted by a majority vote of City Council. There are seven (7) exceptions to this amendment under Proposition 26:
3 1.

2. 3.

4. 5.

6. 7.

Full Cost: Summarizes both direct and indirect costs associated with the fee, rate, or charge. If no cost is provided, the basis for the charge is defined either by ordinance or resolution, calculated separately based on individual circumstances, or established by an outside entity.

Date Fee Last Changed: The date the fee was last updated by ordinance and/or resolution.

Fee Detail:

Comments: Identifies special notes related to the specific fee, rate, or charge.

Charging Dept/Div: City Department/Division responsible for initiating the fee, rate, or charge.

Collecting Dept/Div: City Department/Division assigned to collect the fee, rate, or charge.

Objective: The reasoning as to why the City collects the fee, rate, or charge. This schedule may identify one or more of the following classifications: (1) Recover Cost, (2) User Tax, (3) User Fee, (4) Penalty, (5) Compliance, and (6) Impact Development Prop 26 Exception: Identifies exception classification for the fee, rate, or charge. The reader will see numbers 1-7, or a combination of 1-7, as some fees, rates, and charges fall under multiple classifications. N/A signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Column Descriptors
Description of Fee, Rate, or Charge: Identifies the nature of the fee, rate, or charge.

Current Fee and Period: Identifies the current cost associated with the fee, rate, or charge.

Technology Fee: Identifies whether or not the Technology Fee applies. 4 Community Development Department Public Works Department California Electrical Code Clean-Up Campagin Rates
California Administrative Code Garbage / Rubbish / Recycle Rates California Building Code, Volume

Household Hazardous Waste Rates
California Building Security Code Storm Drain Environmental Compliance Fee California Code for the Abatement of Dangerous Buildings California Housing Code
California Mechanical Code Water and Sewer Utilities Department California Plumbing Code Sewer Rates
Solar Domestic Hot Water System Service Charges
Solar Swimming Pool Heater Service Charges
Electric Utility Department Water Rates
Electric Rates
Parks and Recreation Department
Class Rates
Taxable items are subject to applicable sales taxes at prevailing tax rates.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
The Following is a List of Separately Published Fee Schedules.

These Schedules Are Not Included in This Document.

Copies of These Documents Can Be Found in the City Clerk's Office Located at City Hall and at Central Library's Reference Desk.
5 Department / Division: Citywide Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Copy Fee 0.20$ No Charged by: Date 6/10/2008 Objective: Recover Cost Copies of Statements of Unchanged - Refer to Public per page Citywide Economic Interest (Form 700) Current Fee Res. No. 08-7525 Prop 26 Exception: 1, 2 and Campaign Statements Collected by: are 10 cents per page for
Citywide Full Cost: 0.20$ copies.

CD / DVD Materials 3.00$ No Charged by: Date 6/10/2008 Objective: Recover Cost Unchanged - Refer to per CD / DVD Citywide Current Fee
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Citywide Full Cost: 3.00$
Payment Default Fee 25.00$ No Charged by: Date 7/16/2019 Objective: Recover Cost CA Civil Code 1719 Unchanged - Refer to (includes NSF check, direct Citywide Current Fee
payment decline, default Ord. No. Prop 26 Exception: 1, 2, 5 credit card charge) Collected by:

Citywide Full Cost: 25.00$
Technology Fee 3.37% of applicable fees Yes Charged by: Date 7/16/2019 Objective: Recover Cost Unchanged - Refer to Citywide Current Fee
Ord. No. Prop 26 Exception: 1, 2
Collected by:

Citywide Full Cost: varies
Subpoena Fees 275.00$ No Charged by: Date 4/22/2014 Objective: Compliance Unchanged - Refer to All Employees (deposit) Citywide Current Fee
Ord. No. Prop 26 Exception: N/A *
Collected by:

Citywide Other (specify): Full Cost: N/A
CMD 17

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 1 - 1
Department / Division: Citywide Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Jury Fees 30.00$ No Charged by: Date 6/12/2001 Objective: Recover Cost Unchanged - Refer to Federal District Court per day and IRS Citywide Current Fee Business Mileage Rate Ord. No. Prop 26 Exception: N/A * Collected by:

Citywide Other (specify): Full Cost: N/A
CMD 25
Credit Card Convenience Fee Fees assessed by third- No Charged by: Date 12/3/2024 Objective: Recover Cost See note [a] Unchanged - Refer to party vendors to use Citywide Current Fee
credit card / other Res. No. 24-9402 Prop 26 Exception: 1, 2 payment types Collected by:

Citywide Full Cost: varies[a] Credit Card transaction limits: minimum of $5, maximum of $7,500 for residential, and maximum of $100,000 for commercial customer payments. Maximum limit does not apply to Cemetery and Industrial customers. Pursuant to Resolution No. 24-9402 adopted on 12/3/2024. * Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 1 - 2

Department / Division: City Clerk's Office Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Lobbying Activities Charged by: Date 4/23/2024 Objective: Recover Cost Annual registration is due by Unchanged - Refer to Annual Registration Fee 773.00$ No City Clerk's User Fee January 15th of a given year. Current Fee Office Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Full Cost: 800.06$
City Clerk's
Office
Lobbying Activities Charged by: Date 4/23/2024 Objective: Recover Cost Persons registering for the Unchanged - Refer to Prorated Registration Fee 364.00$ No City Clerk's User Fee first time after June 30th of a Current Fee Office Res. No. 24-9316 Prop 26 Exception: 3 given year.

Collected by: Full Cost: 376.74$
City Clerk's
Office
Lobbying Activities Charged by: Date 4/23/2024 Objective: Recover Cost Lobbyists with a change to Unchanged - Refer to Amended Registration Fee 182.00$ No City Clerk's User Fee registration information shall Current Fee Office Res. No. 24-9316 Prop 26 Exception: 3 file an amended registration within fifteen (15) days of such
Collected by: Full Cost: 188.37$ change if he or she has City Clerk's accepted a new client for
Office compensation in excess of five
hundred dollars ($500.00).

Lobbying Activities Charged by: Date 4/23/2024 Objective: Recover Cost Unchanged - Refer to Client Registration Fee 136.00$ No City Clerk's User Fee Current Fee per client Office Res. No. 24-9316 Prop 26 Exception: 3 Collected by: Full Cost: 140.76$
City Clerk's
Office
Lobbying Activities Charged by: Date 12/5/2017 Objective: Recover Cost Up to a maximum of $500.00 Unchanged - Refer to Delinquent Fee 25.00$ No City Clerk's Penalty Current Fee (Non-Compliance Fine) per day Office Res. No. 17-8483 Prop 26 Exception: 5 Collected by: O. No.: 1949 Full Cost: 25.00$
City Clerk's
Office O. Date: 1/12/2016

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 2 - 1

Department / Division: City Manager's Office Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
No-Fee Parade Permit Charged by: Date 9/18/2018 Objective: See Resolution No. 18-8606 For Santa Clara non-profit organizations No Fee No City Manager's Unchanged - Refer to Office Res. No. 18-8606 Prop 26 Exception: Current Fee
Collected by: Full Cost: 692.42$
City Manager's
Office

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 3 - 1

Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
MINOR RESIDENTIAL COMBINATION Charged by: Date: 4/18/2023 Objective: Recover Cost Additional fees apply PERMIT FEES Building Division (e.g., permit issuance fee Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) A/C (with or w/o Furnace) - Relocation 384.00$ Yes Collected by: 397.00$ 3.4% Building Division Full Cost: 397.44$
A/C (with or w/o Furnace) - Same 154.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 159.00$ 3.2% Location Building Division (e.g., permit issuance fee
Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected by:

Building Division Full Cost: 159.39$
Furnace Replacement - Relocation 384.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 397.00$ 3.4% Building Division (e.g., permit issuance fee
Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected by:

Building Division Full Cost: 397.44$
Furnace Replacement - Same Location 230.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 238.00$ 3.5% Building Division (e.g., permit issuance fee
Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected by:

Building Division Full Cost: 238.05$
New Tankless Water Heater 309.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 319.00$ 3.2% (for like for like water heater permit Building Division (e.g., permit issuance fee fees, see Section 3-C Plumbing Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Permit fees) Collected by:

Building Division Full Cost: 319.82$
Water Heater - Relocate Existing 309.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 319.00$ 3.2% Water Heater (like for like water heater Building Division (e.g., permit issuance fee permit fees, see Section 3-C Plumbing Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Permit fees) Collected by:

Building Division Full Cost: 319.82$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 4 - 1
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Permit Issuance Fee 95.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 98.00$ 3.2% Building Division
Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected by:

Building Division Full Cost: 99.18$
Technology Fee 3.37% of Building Permit No Charged by: Date: 7/16/2019 Objective: Recover Cost Unchanged - Refer to Fee, Electrical Permit Building Division Current Fee
Fee, Plumbing Permit Res. No. Prop 26 Exception: 1, 2
Fee, Mechanical Permit Collected by:

Fee, Plan Check, and Building Division Full Cost: 3.37% Other Applicable Fees
as Stated in the
"Technology Fee"
Column
General Plan / Advanced Planning 12.39% of Building No Charged by: Date: 7/16/2019 Objective: Recover Cost Unchanged - Refer to Surcharge Permit and Plan Check Planning Division Current Fee Fees Res. No. Prop 26 Exception: 1, 2
Collected by:

Building Division Full Cost: 12.39%
Building Conformance Fee Valuation x $0.00032 No Charged By: Date: 6/22/2021 Objective: Recover Cost Unchanged - Refer to Building Division Current Fee
Res. No. 21-8981 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: Valuation x
$0.00032
3-B ELECTRICAL PERMIT FEES Charged By: Date: 4/18/2023 Objective: Recover Cost SYSTEM FEE SCHEDULE Building Division
Res. No. 23-9221 Prop 26 Exception: 1, 2, 3
New Buildings or Alterations Collected By:

Commercial Buildings per sq. ft. 0.32$ Yes Building Division Full Cost: 0.33$ 0.33$ 3.5% Residential Buildings per sq. ft. 0.23$ Yes Full Cost: 0.24$ 0.24$ 3.5% New garages, carports and accessory 0.09$ Yes Full Cost: 0.09$ Unchanged - Refer to buildings per sq. ft. Current Fee
Reference: CMD 109 4 - 2
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Private Swimming Pools Charged By: Date: 4/18/2023 Objective: Recover Cost For new private, in-ground swimming 345.00$ Yes Building Division 357.00$ 3.5% pools for single-family and multi-family Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 occupancies Collected By:

Building Division Full Cost: 357.08$
Outdoor Events Charged By: Date: 4/18/2023 Objective: Recover Cost For electric generators and 345.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 357.00$ 3.5% electrically driven rides Res. No. 23-9221 Full Cost: 357.08$ Collected By:

For mechanically driven rides and 345.00$ Yes Building Division Full Cost: 357.08$ 357.00$ 3.5% walk-through attractions or
displays having electric lighting
For a system of area and booth lighting 345.00$ Yes Full Cost: 357.08$ 357.00$ 3.5% Temporary Power Service Charged By: Date: 4/18/2023 Objective: Recover Cost For a temporary service power pole or 345.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 357.00$ 3.5% pedestal-mounted receptacle outlets and Res. No. 23-9221 appurtenances Collected By: Full Cost: 357.08$
Building Division
For a temporary distribution system and 345.00$ Yes Full Cost: 357.08$ 357.00$ 3.5% temp lighting and receptacle outlets for
construction sites, decorative lights,
Christmas tree sales lots,
fireworks stands, etc.

UNIT FEE SCHEDULE Charged By: Date: 4/23/2024 Objective: Recover Cost Building Division
Receptacle, Switch and Lighting Res. No. 24-9316 Prop 26 Exception: 1, 3 Outlets Collected By:

First 20, each 3.83$ Yes Building Division Full Cost: 3.96$ 3.96$ 3.5% Additional fixtures, each 2.88$ Yes Full Cost: 2.98$ 2.98$ 3.5% Reference: CMD 109 4 - 3
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Lighting Fixtures Charged By: Date: 4/23/2024 Objective: Recover Cost First 20 fixtures, each 3.83$ Yes Building Division Prop 26 Exception: 1, 3 3.96$ 3.5% Res. No. 24-9316 Full Cost: 3.96$
Additional fixtures, each 2.88$ Yes Collected By: 2.98$ 3.5% Building Division Full Cost: 2.98$
For pole or platform-mounted lighting 7.00$ Yes Unchanged - Refer to fixtures, each Full Cost: 7.94$ Current Fee For theatrical-type lighting fixtures or 7.00$ Yes Full Cost: 7.94$ Unchanged - Refer to assemblies, each Current Fee
Residential Appliances Charged By: Date: 4/18/2023 Objective: Recover Cost For fixed residential appliances or 23.00$ Yes Building Division Unchanged - Refer to receptacle outlets, each Res. No. 23-9221 Prop 26 Exception: 1, 3 Current Fee Collected By:

Building Division Full Cost: 23.81$
Power Apparatus Charged By: Date: 4/18/2023 Objective: Recover Cost Up to and including 1, each 38.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 39.00$ 2.6% Res. No. 23-9221 Full Cost: 39.67$
Over 1 and not over 10, each 57.00$ Yes Collected By: Full Cost: 59.51$ 58.00$ 1.8% Building Division
Over 10 and not over 50, each 95.00$ Yes Full Cost: 99.18$ 98.00$ 3.2% Over 50 and not over 100, each 115.00$ Yes Full Cost: 119.03$ 119.00$ 3.5% Over 100, each 153.00$ Yes Full Cost: 158.70$ 158.00$ 3.3% Busways Charged By: Date: 4/18/2023 Objective: Recover Cost For trolley and plug-in-type busways, 95.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 98.00$ 3.2% each 100 feet Res. No. 23-9221
Collected By: Full Cost: 99.18$
Building Division
Reference: CMD 109 4 - 4
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Signs, Outline Lighting and Marquees Charged By: Date: 4/18/2023 Objective: Recover Cost For signs, outline lighting systems or 95.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 98.00$ 3.2% marquees supplies from one branch Res. No. 23-9221
circuit Collected By: Full Cost: 99.25$
Building Division
For additional branch circuits with 76.00$ Yes Full Cost: 79.35$ 78.00$ 2.6% the same sign, outline lighting system or
marquee
Services Charged By: Date: 4/18/2023 Objective: Recover Cost For services of 600 volts or less and 153.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 158.00$ 3.3% not over 200 amperes in rating, each Res. No. 23-9221 Full Cost: 158.70$ Collected By:

For services of 600 volts or less and 268.00$ Yes Building Division Full Cost: 277.72$ 277.00$ 3.4% over 200 amperes to 1,000 amperes
in rating, each
For services over 600 volts or 402.00$ Yes Full Cost: 416.59$ 416.00$ 3.5% over 1,000 amperes in rating, each
Miscellaneous Apparatus, Conduits, Charged By: Date: 4/18/2023 Objective: Recover Cost and Conductors Building Division Prop 26 Exception: 1, 2, 3 For electrical apparatus, conduits, and 95.00$ Yes Res. No. 23-9221 98.00$ 3.2% conductors for which a permit is required Collected By: Full Cost: 99.18$ but for which no fee is herein set forth Building Division 3-C MECHANICAL PERMIT FEES Charged By: Date: 4/18/2023 Objective: Recover Cost NEW BUILDINGS Building Division Prop 26 Exception: 1, 2, 3 Res. No. 23-9221
New Commercial buildings, per sq. ft. 0.27$ Yes Collected By: Full Cost: 0.29$ 0.28$ 3.5% Building Division
New Residential buildings, per sq. ft. 0.09$ Yes Full Cost: 0.09$ Unchanged - Refer to Current Fee
Reference: CMD 109 4 - 5
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
UNIT FEE SCHEDULE Charged By: Date: 4/18/2023 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
Furnaces Res. No. 23-9221
For installation or relocation of 287.00$ Yes Collected By: Full Cost: 297.56$ 297.00$ 3.5% forced-air or gravity-type furnace, Building Division
up to and including 100,000 Btu/h
For installation or relocation or 287.00$ Yes Full Cost: 297.56$ 297.00$ 3.5% forced-air or gravity-type furnace,
over 100,000 Btu/h
For installation or relocation of 287.00$ Yes Full Cost: 297.56$ 297.00$ 3.5% each floor furnace
For installation or relocation of each 287.00$ Yes Full Cost: 297.56$ 297.00$ 3.5% suspended heater, recessed wall
heater or floor-mounted unit
Appliance Vents Charged By: Date: 4/18/2023 Objective: Recover Cost For the installation, relocation or 460.00$ Yes Building Division 476.00$ 3.5% replacement of each appliance vent Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 not included in an appliance permit Collected By:

Building Division Full Cost: 476.10$
Repairs or Additions Charged By: Date: 4/18/2023 Objective: Recover Cost For the repair or, alteration of, or 460.00$ Yes Building Division 476.00$ 3.5% additional to each Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 Collected By:

Building Division Full Cost: 476.10$
Reference: CMD 109 4 - 6
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Boilers, Compressors and Absorption Charged By: Date: 4/23/2024 Objective: Recover Cost Systems Building Division Prop 26 Exception: 1, 2, 3
Up to and including 3 horsepower or up to 402.00$ Yes Res. No. 24-9316 Full Cost: 416.59$ 416.00$ 3.5% and including 100,000 Btu/h Collected By:

Building Division
Over 3 horsepower to and including 15 460.00$ Yes Full Cost: 476.10$ 476.00$ 3.5% horsepower or over 100,000 Btu/h to
and including 500,000 Btu/h
Over 15 to and including 30 horsepower 498.00$ Yes Full Cost: 515.77$ 515.00$ 3.4% or over 500,000 to and including
1,000,000 Btu/h
Over 30 to and including 50 horsepower 555.00$ Yes Full Cost: 575.28$ 574.00$ 3.4% or over 1,000,000 to and including
1,750,000 Btu/h
Over 50 horsepower or over 613.00$ Yes Full Cost: 634.80$ 634.00$ 3.4% 1,750,000 Btu/h
Air Handlers Charged By: Date: 4/18/2023 Objective: Recover Cost Each unit up to and including 10,000 306.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 316.00$ 3.3% cubic feet per minute Res. No. 23-9221 Full Cost: 317.40$ Collected By:

Each unit Over 10,000 cfm 460.00$ Yes Building Division Full Cost: 476.10$ 476.00$ 3.5% Evaporative Coolers Charged By: Date: 4/18/2023 Objective: Recover Cost For each evaporative cooler other than 460.00$ Yes Building Division 476.00$ 3.5% portable type Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 Collected By:

Building Division Full Cost: 476.10$
Reference: CMD 109 4 - 7
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Ventilation and Exhaust Charged By: Date: 4/18/2023 Objective: Recover Cost For each ventilation fan connected to 95.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 98.00$ 3.2% a single duct Res. No. 23-9221 Full Cost: 99.18$
Collected By:

For each ventilation system which is not a 172.00$ Yes Building Division Full Cost: 178.54$ 178.00$ 3.5% portion of any heating or air-conditioning
system authorized by a permit
For the installation of each hood which is 460.00$ Yes Full Cost: 476.10$ 476.00$ 3.5% served by mechanical exhaust
Incinerators Charged By: Date: 4/18/2023 Objective: Recover Cost For the installation or relocation of 230.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 238.00$ 3.5% each domestic-type incinerator Res. No. 23-9221 Full Cost: 238.05$ Collected By:

For the installation or relocation of 460.00$ Yes Building Division Full Cost: 476.10$ 476.00$ 3.5% each commercial or
industrial-type incinerator
Miscellaneous Charged By: Date: 4/18/2023 Objective: Recover Cost For each appliance or piece of 460.00$ Yes Building Division 476.00$ 3.5% equipment regulated by the Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 Mechanical Code but not classified in Collected By:
other appliance categories Building Division Full Cost: 476.10$ 3-C PLUMBING PERMIT FEES Charged By: Date: 4/18/2023 Objective: Recover Cost NEW BUILDINGS Building Division Prop 26 Exception: 1, 2, 3 Res. No. 23-9221
New Commercial buildings, per sq. ft. 0.21$ Yes Collected By: Full Cost: 0.22$ 0.22$ 3.5% Building Division
New Residential buildings, per sq. ft. 0.09$ Yes Full Cost: 0.09$ Unchanged - Refer to Current Fee
UNIT FEE SCHEDULE Charged By: Date: 4/18/2023 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
Fixtures and Vents Res. No. 23-9221
For each plumbing fixture or trap or 230.00$ Yes Collected By: Full Cost: 238.05$ 238.00$ 3.5% set of fixtures on one trap Building Division
For repair or alteration of drainage or 230.00$ Yes Full Cost: 238.05$ 238.00$ 3.5% vent piping, each fixture
Reference: CMD 109 4 - 8
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Sewers, Disposal Systems and Charged By: Date: 4/18/2023 Objective: Recover Cost Interceptors Building Division Prop 26 Exception: 1, 2, 3 For each building sewer and each trailer 230.00$ Yes Res. No. 23-9221 Full Cost: 238.05$ 238.00$ 3.5% park sewer Collected By:

Building Division
For each cesspool 95.00$ Yes Full Cost: 99.18$ 98.00$ 3.2% For each private sewage disposal 95.00$ Yes Full Cost: 99.18$ 98.00$ 3.2% system
For each industrial waste pretreatment 230.00$ Yes Full Cost: 238.05$ 238.00$ 3.5% interceptor
Rainwater systems - per drain 57.00$ Yes Full Cost: 59.51$ 58.00$ 1.8% Water Piping and Water Heaters Charged By: Date: 4/18/2023 Objective: Recover Cost For installation, alteration, or repair of 230.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 238.00$ 3.5% water piping and/or water-treating Res. No. 23-9221 Full Cost: 238.05$ equipment Collected By:

Building Division
For each water heater including vent 230.00$ Yes Full Cost: 238.05$ 238.00$ 3.5% Water Softener 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 238.00$ 3.5% Building Division (e.g., permit issuance fee
Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 238.05$
Water Heater - Same Location 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 238.00$ 3.5% (like for like) Building Division (e.g., permit issuance fee Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 238.05$
Gas Piping Systems Charged By: Date: 4/18/2023 Objective: Recover Cost For each gas piping system of one to 153.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 158.00$ 3.3% five outlets Res. No. 23-9221 Full Cost: 158.67$
Collected By:

For each additional outlet over five 5.70$ Yes Building Division Full Cost: 5.95$ 5.00$ -12.3% Reference: CMD 109 4 - 9
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Lawn Sprinklers, Vacuum Breakers Charged By: Date: 4/18/2023 Objective: Recover Cost and Backflow Protection Devices Building Division Prop 26 Exception: 1, 2, 3 For each lawn sprinkler system on 230.00$ Yes Res. No. 23-9221 Full Cost: 238.05$ 238.00$ 3.5% any one meter Collected By:

Building Division
For atmospheric-type vacuum breakers or 95.00$ Yes Full Cost: 99.18$ 98.00$ 3.2% backflow protection 1 to 5 devices
Over 5 devices, each 18.00$ Yes Full Cost: 19.84$ Unchanged - Refer to Current Fee
For each backflow protective device 230.00$ Yes Full Cost: 238.05$ 238.00$ 3.5% other than atmospheric-type
vacuum breakers 2 in and smaller
Over 2 in 230.00$ Yes Full Cost: 238.05$ 238.00$ 3.5% Swimming Pools Charged By: Date: 4/18/2023 Objective: Recover Cost Public pool 690.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 714.00$ 3.5% Res. No. 23-9221 Full Cost: 714.15$
Public spa 575.00$ Yes Collected By: Full Cost: 595.13$ 595.00$ 3.5% Building Division
Private pool 575.00$ Yes Full Cost: 595.13$ 595.00$ 3.5% Private spa 460.00$ Yes Full Cost: 476.10$ 476.00$ 3.5% Miscellaneous Charged By: Date: 4/18/2023 Objective: Recover Cost For each appliance or piece of 230.00$ Yes Building Division 238.00$ 3.5% equipment regulated by the Plumbing Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 Code but not classified in other appliance Collected By:
categories Building Division Full Cost: 238.05$
Reference: CMD 109 4 - 10
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
3-G GRADING PLAN REVIEW FEES Charged By: Date: 4/23/2024 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
50 cubic yards or less No Fee Yes Res. No. 24-9316 Full Cost: -$ Unchanged - Refer to Collected By: Current Fee
51 to 100 cubic yards 345.00$ Yes Building Division Full Cost: 357.08$ 357.00$ 3.5% 101 to 1,000 cubic yards 920.00$ Yes Full Cost: 952.20$ 952.00$ 3.5% 1,001 to 10,000 cubic yards 1,380.00$ Yes Full Cost: 1,428.30$ 1,428.00$ 3.5% 10,001 to 100,000 cubic yards - base 2,300.00$ Yes Full Cost: 2,380.50$ 2,380.00$ 3.5% Each additional 10,000 cubic yards 102.22$ Yes Full Cost: 105.80$ 105.80$ 3.5% 100,001 to 200,000 cubic yards - base 3,220.00$ Yes Full Cost: 3,332.70$ 3,332.00$ 3.5% Each additional 10,000 cubic yards 230.00$ Yes Full Cost: 238.05$ 238.00$ 3.5% 200,001 cubic yards or more - base 5,520.00$ Yes Full Cost: 5,713.20$ 5,713.00$ 3.5% Each additional 10,000 cubic yards 115.00$ Yes Full Cost: 119.03$ 119.00$ 3.5% 3-H GRADING PERMIT FEES Charged By: Date: 4/23/2024 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
100 cubic yards or less 460.00$ Yes Res. No. 24-9316 Full Cost: 476.10$ 476.00$ 3.5% Collected By:
101 to 1,000 cubic yards - base 460.00$ Yes Building Division Full Cost: 476.10$ 476.00$ 3.5% Each additional 100 cubic yards 76.67$ Yes Full Cost: 79.35$ 79.35$ 3.5% 1,001 to 10,000 cubic yards - base 1,150.00$ Yes Full Cost: 1,190.25$ 1,190.00$ 3.5% Each additional 1,000 cubic yards 51.11$ Yes Full Cost: 52.90$ 52.90$ 3.5% 10,001 to 100,000 cubic yards - base 1,610.00$ Yes Full Cost: 1,666.35$ 1,666.00$ 3.5% Each additional 10,000 cubic yards 204.44$ Yes Full Cost: 211.60$ 211.60$ 3.5% 100,001 cubic yards or more - base 3,450.00$ Yes Full Cost: 3,570.75$ 3,570.00$ 3.5% Each additional 10,000 cubic yards 102.22$ Yes Full Cost: 105.80$ 105.80$ 3.5% Reference: CMD 109 4 - 11
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
3-I OTHER INSPECTIONS AND FEES Charged By: Date: 4/18/2023 Objective: Recover Cost Building Division
Minimum Permit Fee per Trade 230.00$ Yes Res. No. 23-9221 Prop 26 Exception: 3 238.00$ 3.5% Collected By:

Building Division Full Cost: 238.05$
Inspections outside of normal business 298.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 308.00$ 3.4% hours (per hour) - (Min of 2 hours) Building Division
Res. No. 23-9221 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 309.47$
Re-inspection fees assessed under 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 238.00$ 3.5% provisions of Section 305.8 (per hour) Building Division Res. No. 23-9221 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 238.05$
Inspections for which no fee is 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 238.00$ 3.5% specifically indicated (per hour) Building Division
Res. No. 23-9221 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 238.05$
Additional plan review required by 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 238.00$ 3.5% changes, additions or revisions to Building Division
approved plans (per hour) Res. No. 23-9221 Prop 26 Exception: 1, 3 Collected By:

Building Division Full Cost: 238.05$
For use of outside consultants for No Fee Yes Charged By: Date: 4/28/2020 Objective: Recover Cost Unchanged - Refer to plan checking and inspections Building Division Current Fee Res. No. Prop 26 Exception: 3
Collected By:

Building Division Full Cost: -$
Reference: CMD 109 4 - 12
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Plan Review outside of normal business 298.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 308.00$ 3.4% hours (per hour) - (Min of 2 hours) Building Division
Res. No. 23-9221 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 309.47$
Phased Plan Check 25% of original plan Yes Charged By: Date: 4/19/2022 Objective: Recover Cost Unchanged - Refer to (for each phase) review fee Building Division Current Fee Res. No. 22-9081 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 25% of PC
Master Plan Fee 25% of original plan Yes Charged By: Date: 4/19/2022 Objective: Recover Cost 25% of original current plan
review fee Building Division review fee
Res. No. 22-9081 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 25% of PC
Alternate Materials & Methods Review 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 238.00$ 3.5% (per hour) - (Minimum 3 hours) Building Division
Res. No. 23-9221 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 238.05$
Temporary Certificate of Occupancy 1,150.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 1,190.00$ 3.5% Building Division
Res. No. 23-9221 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 1,190.25$
Permit to Final (per trade) 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 238.00$ 3.5% (minimum 1-hour per trade) Building Division
Res. No. 23-9221 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 238.05$
Reference: CMD 109 4 - 13
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Application Extension 95.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 98.00$ 3.2% Building Division
Res. No. 23-9221 Prop 26 Exception: 1, 2, 3
Collected By:

Building Division Full Cost: 99.18$
Permit Extension 95.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 98.00$ 3.2% Building Division
Res. No. 23-9221 Prop 26 Exception: 1, 3
Collected By:

Building Division Full Cost: 99.18$
Replacement Permit 95.00$ Yes Charged By: Date: 4/23/2024 Objective: Recover Cost 98.00$ 3.2% Building Division
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: 99.18$
Addressing 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 238.00$ 3.5% (per hour - two hour minimum) Building Division
Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: 238.05$
Plan Duplication of lost plan set 95.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 98.00$ 3.2% (up to 20 pages) Building Division
Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: 99.18$
Review and stamp transfer of lost plan 95.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost 98.00$ 3.2% set Building Division
Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: 99.18$
Reference: CMD 109 4 - 14
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Photovoltaic - Residential Charged By: Date: 6/22/2021 Objective: Recover Cost See Gov't Code 66015 15KW or less 450.00$ Yes Building Division Unchanged - Refer to Res. No. 21-8981 Prop 26 Exception: 1, 2, 3 Current Fee Per KW above 15 15.00$ Yes Collected By: Unchanged - Refer to Building Division Full Cost: Set by State Current Fee
Photovoltaic - Commercial Charged By: Date: 6/22/2021 Objective: Recover Cost See Gov't Code 66015 50KW or less 1,000.00$ Yes Building Division Unchanged - Refer to Current Fee
Res. No. 21-8981 Prop 26 Exception: 1, 2, 3
Between 50KW and 250 KW (base) 1,000.00$ Yes Collected By: Unchanged - Refer to Current Fee
Building Division Full Cost: Set by State
Between 50KW and 250 KW (per KW) 7.00$ Yes Unchanged - Refer to Current Fee
Greater than 250 KW (base) 2,400.00$ Yes Unchanged - Refer to Current Fee
Greater than 250 KW (per KW) 5.00$ Yes Unchanged - Refer to Current Fee
Photovoltaic - Solar Thermal Charged By: Date: 6/22/2021 Objective: Recover Cost See Gov't Code 66015 10kwth or less 450.00$ Yes Building Division Unchanged - Refer to Current Fee
Res. No. 21-8981 Prop 26 Exception: 1, 2, 3
Greater than 10kwth (base) 450.00$ Yes Collected By: Unchanged - Refer to Current Fee
Building Division Full Cost: Set by State
Per kwth above 10kwth 15.00$ Yes Unchanged - Refer to Current Fee
Bathroom Remodel (like for like) 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 238.00$ 3.5% Building Division (e.g., permit issuance fee
Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 238.05$
Reference: CMD 109 4 - 15
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Foundation Repair / Seismic Upgrade 345.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 357.00$ 3.5% Building Division (e.g., permit issuance fee
Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 357.08$
Pool Demo 230.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 238.00$ 3.5% Building Division (e.g., permit issuance fee
Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 238.05$
Residential Reroof 671.00$ Yes Charged By: Date: 4/18/2023 Objective: Recover Cost Additional fees apply 694.00$ 3.4% Building Division (e.g., permit issuance fee
Res. No. 23-9221 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 695.52$
SINGLE-FAMILY / DUPLEX / Charged By: Date: 4/23/2024 Objective: Recover Cost ADDITIONAL DWELLING UNIT Building Division
RESIDENTIAL SCALED PERMIT FEE Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 PLAN CHECK Collected By:

Building Division
Project Size
1 to 250 sq. ft. 690.00$ Yes Full Cost: 714.15$ 714.15$ 3.5% 251 to 1,000 sq. ft.

First 250 sq. ft. 690.00$ Yes Full Cost: 714.15$ 714.15$ 3.5% Each additional 100 sq. ft. or 276.00$ Yes Full Cost: 285.66$ 285.66$ 3.5% fraction thereof
1,001 to 3,000 sq. ft.

First 1,000 sq. ft. 2,760.00$ Yes Full Cost: 2,856.60$ 2,856.60$ 3.5% Each additional 100 sq. ft. or 138.00$ Yes Full Cost: 142.83$ 142.83$ 3.5% fraction thereof
3,001 to +
First 3,000 sq. ft. 5,520.00$ Yes Full Cost: 5,713.20$ 5,713.20$ 3.5% Each additional 100 sq. ft. or 69.00$ Yes Full Cost: 71.42$ 71.42$ 3.5% fraction thereof
Reference: CMD 109 4 - 16
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
INSPECTION Charged By: Date: 4/23/2024 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
Project Size Res. No. 24-9316
1 to 250 sq. ft. 765.90$ Yes Collected By: Full Cost: 792.71$ 792.71$ 3.5% Building Division
251 to 1,000 sq. ft.

First 250 sq. ft. 765.90$ Yes Full Cost: 792.71$ 792.71$ 3.5% Each additional 100 sq. ft. or 235.21$ Yes Full Cost: 243.44$ 243.44$ 3.5% fraction thereof
1,001 to 3,000 sq. ft.

First 1,000 sq. ft. 2,530.00$ Yes Full Cost: 2,618.55$ 2,618.55$ 3.5% Each additional 100 sq. ft. or 199.30$ Yes Full Cost: 206.28$ 206.28$ 3.5% fraction thereof
3,001 to +
First 3,000 sq. ft. 6,515.90$ Yes Full Cost: 6,743.96$ 6,743.96$ 3.5% Each additional 100 sq. ft. or 99.65$ Yes Full Cost: 103.14$ 103.14$ 3.5% fraction thereof
Reference: CMD 109 4 - 17
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
COMMERCIAL / MULTI-FAMILY / Charged By: Date: 4/23/2024 Objective: Recover Cost INDUSTRIAL SCALED PERMIT FEE Building Division
PLAN CHECK Res. No. 24-9316 Prop 26 Exception: 1, 2, 3, 6 Collected By:

Project Valuation Building Division
$1 to $1,000 115.00$ Yes Full Cost: 119.03$ 119.03$ 3.5% $1,001 to $10,000
First $1,000 115.00$ Yes Full Cost: 119.03$ 119.03$ 3.5% Each additional $1,000 or fraction thereof 19.17$ Yes Full Cost: 19.84$ 19.84$ 3.5% $10,001 to $75,000
First $10,000 287.50$ Yes Full Cost: 297.56$ 297.56$ 3.5% Each additional $1,000 or fraction thereof 16.81$ Yes Full Cost: 17.40$ 17.40$ 3.5% $75,001 to $150,000
First $75,000 1,380.00$ Yes Full Cost: 1,428.30$ 1,428.30$ 3.5% Each additional $1,000 or fraction thereof 21.47$ Yes Full Cost: 22.22$ 22.22$ 3.5% $150,001 to $750,000
First $150,000 2,990.00$ Yes Full Cost: 3,094.65$ 3,094.65$ 3.5% Each additional $1,000 or fraction thereof 7.48$ Yes Full Cost: 7.74$ 7.74$ 3.5% $750,001 to $3,000,000
First $750,000 7,475.00$ Yes Full Cost: 7,736.63$ 7,736.63$ 3.5% Each additional $1,000 or fraction thereof 5.26$ Yes Full Cost: 5.44$ 5.44$ 3.5% $3,000,001 to $10,000,000
First $3,000,000 19,320.00$ Yes Full Cost: 19,996.20$ 19,996.20$ 3.5% Each additional $1,000 or fraction thereof 3.09$ Yes Full Cost: 3.20$ 3.20$ 3.5% $10,000,001 to +
First $10,000,000 40,940.00$ Yes Full Cost: 42,372.90$ 42,372.90$ 3.5% Each additional $1,000 or fraction thereof 1.54$ Yes Full Cost: 1.59$ 1.59$ 3.5% Reference: CMD 109 4 - 18
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
INSPECTION PERMIT Charged By: Date: 4/23/2024 Objective: Recover Cost Building Division
Project Valuation Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 $1 to $1,000 115.00$ Yes Collected By: Full Cost: 119.03$ 119.03$ 3.5% Building Division
$1,001 to $10,000
First $1,000 115.00$ Yes Full Cost: 119.03$ 119.03$ 3.5% Each additional $1,000 or fraction thereof 38.24$ Yes Full Cost: 39.58$ 39.58$ 3.5% $10,001 to $75,000
First $10,000 459.19$ Yes Full Cost: 475.26$ 475.26$ 3.5% Each additional $1,000 or fraction thereof 21.24$ Yes Full Cost: 21.98$ 21.98$ 3.5% $75,001 to $150,000
First $75,000 1,840.00$ Yes Full Cost: 1,904.40$ 1,904.40$ 3.5% Each additional $1,000 or fraction thereof 24.53$ Yes Full Cost: 25.39$ 25.39$ 3.5% $150,001 to $750,000
First $150,000 3,680.00$ Yes Full Cost: 3,808.80$ 3,808.80$ 3.5% Each additional $1,000 or fraction thereof 9.20$ Yes Full Cost: 9.52$ 9.52$ 3.5% $750,001 to $3,000,000
First $750,000 9,200.00$ Yes Full Cost: 9,522.00$ 9,522.00$ 3.5% Each additional $1,000 or fraction thereof 4.09$ Yes Full Cost: 4.23$ 4.23$ 3.5% $3,000,001 to $10,000,000
First $3,000,000 18,400.00$ Yes Full Cost: 19,044.00$ 19,044.00$ 3.5% Each additional $1,000 or fraction thereof 3.81$ Yes Full Cost: 3.95$ 3.95$ 3.5% $10,000,001 to +
First $10,000,000 45,080.00$ Yes Full Cost: 46,657.80$ 46,657.80$ 3.5% Each additional $1,000 or fraction thereof 1.91$ Yes Full Cost: 1.97$ 1.97$ 3.5% Reference: CMD 109 4 - 19
Department / Division: Community Development / Building Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Expedited Plan Review Service Yes Charged By: Date: Objective: Recover Cost Additional 50% of Current New Building Division Plan Review Fee
Res. No. Prop 26 Exception: 1, 2, 3
Collected By:

Building Division Full Cost: varies
Fee for Work Commencing Before Equal to Permit Fee No Charged By: Date: 4/19/2022 Objective: Penalty Unchanged - Refer to Permit Issuance Building Division Current Fee
Res. No. 22-9081 Prop 26 Exception: 5
Collected By:

Building Division Full Cost:

Reference: CMD 109 4 - 20
Department / Division: Community Development / Housing & Community Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Neighborhood Conservation Improvement 978.00$ No Charged by: Date: 4/18/2023 Objective: User Fee Non-Interest bearing fee, due 1,012.00$ 3.5% Program (NCIP) Loan Application Fee HCSD at loan payoff for all new Res. No. 23-9221 Prop 26 Exception: 2 loans as of 7/1/2018.

Collected by:

HCSD Full Cost: 1,014.30$
Residential Loan Refinance / 1,760.00$ No Charged by: Date: 4/18/2023 Objective: User Fee 1,821.00$ 3.5% Subordinations all programs HCSD
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 1,825.74$
Multi-Family (MF) Loan Subordination 4,108.00$ No Charged by: Date: 4/18/2023 Objective: User Fee Deposit to Fee covers estimated 4,251.00$ 3.5% Request Review Fee HCSD internal costs. Will bill actual Res. No. 23-9221 Prop 26 Exception: 2 Excess costs over deposit.

Collected by: will be billed.

HCSD Full Cost: 4,260.06$ Borrower will be responsible for all outside legal &
consulting fees, i.e., HTSV.

Loan Demand Payoff Fee - NCIP (through 1,271.00$ No Charged by: Date: 4/18/2023 Objective: User Fee For new loans 1,315.00$ 3.5% title closings) HCSD effective 7/1/2018.

Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 1,318.59$
Loan Demand Payoff Fee - First-Time 1,271.00$ No Charged by: Date: 4/18/2023 Objective: User Fee For new loans 1,315.00$ 3.5% Homebuyer (FTHB) & Below Market HCSD effective 7/1/2018.

Purchase (BMP) Programs BMP Res. No. 23-9221 Prop 26 Exception: 2 (through Title closings) Collected by:

HCSD Full Cost: 1,318.59$
Loan Demand Payoff Fee All Programs 978.00$ No Charged by: Date: 4/18/2023 Objective: User Fee NCIP: only for new loans 1,012.00$ 3.5% NCIP, FTHB, & BMP (for walk-ins) HCSD effective 7/1/2018.

Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 1,014.30$
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
5 - 1Reference: CMD 109
Department / Division: Community Development / Housing & Community Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Loan Demand Payoff Processing Fee - 782.00$ No Charged by: Date: 4/18/2023 Objective: User Fee 809.00$ 3.5% Multi-Family HCSD
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 811.44$
Multi-Family Monitoring Fee 127.00$ No Charged by: Date: 4/18/2023 Objective: User Fee Fee targets less than full 131.00$ 3.1% per unit HCSD cost recovery per unit
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 202.86$
AHA Affordable Housing Agreements - 4,205.00$ No Charged by: Date: 4/18/2023 Objective: User Fee 4,352.00$ 3.5% BMP For Sale per Agreement HCSD per Agreement
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 4,361.49$
Affordable Housing Application Fee Charged by: Date: 4/18/2023 Objective: User Fee HCSD
BMP Affordable Housing Application 500.00$ No Res. No. 23-9221 Prop 26 Exception: 2 Affordable Housing Application Unchanged - Refer to Processing Fee per application Collected by: Processing Fee: $500.00 Current Fee HCSD Full Cost: 500.00$
AHA Affordable Housing Agreement - 5,868.00$ No Charged by: Date: 4/18/2023 Objective: User Fee 6,073.00$ 3.5% MF for Rental per Agreement HCSD per Agreement
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 6,085.80$
AHA Affordable Housing Agreement - 2,151.00$ No Charged by: Date: 4/18/2023 Objective: User Fee 2,226.00$ 3.5% Amendments per Agreement HCSD per Agreement
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 2,231.46$
Multi-Family Transaction Application 978.00$ No Charged by: Date: 4/18/2023 Objective: User Fee This amount shall be deducted 1,012.00$ 3.5% Review Fee HCSD from the total fees that will be
Res. No. 23-9221 Prop 26 Exception: 2 charged at transaction closing Collected by: (i.e., refinancing,
HCSD Full Cost: 1,014.30$ recapitalization, etc.) 5 - 2Reference: CMD 109
Department / Division: Community Development / Housing & Community Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Multi-Family Loan Conversion Fee 7,824.00$ No Charged by: Date: 4/18/2023 Objective: User Fee 8,097.00$ 3.5% HCSD
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 8,114.40$
Multi-Family Loan Origination Fee 58,686.00$ No Charged by: Date: 4/18/2023 Objective: User Fee Fee amount shown represents 60,740.00$ 3.5% HCSD is a not-to-exceed amount. Fee
Res. No. 23-9221 Prop 26 Exception: 2 and may vary based on with Collected by: staff time.

HCSD Full Cost: 60,858.00$
Multi-Family Loan Recapitalization Fee 46,948.00$ No Charged by: Date: 4/18/2023 Objective: User Fee Fee amount shown represents 48,591.00$ 3.5% HCSD is a not-to-exceed amount. Fee
Res. No. 23-9221 Prop 26 Exception: 2 and may vary based on with Collected by: staff time.

HCSD Full Cost: 48,686.40$
Multi-Family Project Restructuring Fee - 15,649.00$ No Charged by: Date: 4/18/2023 Objective: User Fee Fee amount shown represents 16,196.00$ 3.5% Transfer of Ownership (New Parties) HCSD is a n ot-to-exceed amount . Fee Res. No. 23-9221 Prop 26 Exception: 2 and may vary based on with Collected by: staff time.

HCSD Full Cost: 16,228.80$
Multi-Family Project Restructuring Fee - 11,737.00$ No Charged by: Date: 4/18/2023 Objective: User Fee 12,147.00$ 3.5% Transfer of Ownership (Related Parties) HCSD
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 12,171.60$
Multi-Family Project Refinance Fee 23,474.00$ No Charged by: Date: 4/18/2023 Objective: User Fee Fee amount shown represents 24,295.00$ 3.5% HCSD is a not-to-exceed amount. Fee
Res. No. 23-9221 Prop 26 Exception: 2 and may vary based on with Collected by: staff time.

HCSD Full Cost: 24,343.20$
Loan Demand Payoff Fee Recalculation 97.00$ No Charged by: Date: 4/18/2023 Objective: User Fee 100.00$ 3.1%

NCIP, FTHB & BMP HCSD
Res. No. 23-9221 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 101.43$
5 - 3Reference: CMD 109
Department / Division: Community Development / Housing & Community Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Affordable Housing Application Fee - per 75.00$ No Charged by: Date: 4/23/2024 Objective: User Fee 77.00$ 2.7% BMP Applicant HCSD
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 507.15$
New Owner BMP Processing and 2.5% of sales price No Charged by: Date: 4/23/2024 Objective: User Fee Paid by developer Unchanged - Refer to Transaction Fees for BMP Program to be per unit HCSD Current Fee Paid by Developer (per unit) Res. No. 24-9316 Prop 26 Exception: 2 Collected by:

HCSD Full Cost: 16,228.80$
Resale by BMP Owner for sale restricted 2.5% of sales price No Charged by: Date: 4/23/2024 Objective: User Fee Paid by seller and buyer 50/50 Unchanged - Refer to property. BMP Processing and Transaction per unit HCSD Current Fee Fees for BMP Program to be Paid by Res. No. 24-9316 Prop 26 Exception: 2 Seller and Buyer 50/50 (per sale) Collected by:

HCSD Full Cost: 16,228.80$
Development Impact Fees Charged by: Date: 4/23/2024 Objective: Impact Inflate annually by Feb - Feb Affordable Housing Fees HCSD Development change in regional BCI SCMC Res. No. 24-9316 Fee 17.40.060. These fees reflect
For Sale Residential Per Square Foot Collected by: restructure of calculation Per Square Foot Single Family Home 46.24$ No HCSD Prop 26 Exception: 6 methodology. 45.72$ -1.1% Townhome 38.53$ No Full Cost: -$ 38.09$ -1.1%
Condominium 30.83$ No 30.48$ -1.1%
Development Impact Fees Charged by: Date: 4/23/2024 Objective: Impact Inflate annually by Feb - Feb Affordable Housing Fees HCSD Development change in regional BCI SCMC Res. No. 24-9316 Fee 17.40.060.

Rental Residential Per Square Foot Collected by: Per Square Foot Any Tenure Type 30.83$ No HCSD Prop 26 Exception: 6 30.48$ -1.1% Full Cost: -$
5 - 4Reference: CMD 109
Department / Division: Community Development / Housing & Community Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Development Impact Fees Charged by: Date: 4/23/2024 Objective: Impact 1. Office including Industrial Affordable Housing Fees HCSD Development Office, R&D and Commercial Res. No. 24-9316 Fee Office
Non-Residential Projects Per Square Foot Collected by: Per Square Foot Retail < 5,000 sf No Fee No HCSD Prop 26 Exception: 6 2. Low-Intensity Uses such as Unchanged - Refer to Current Fee
Data Centers and Warehouses
Retail ≥ 5,000 sf 7.71$ No Full Cost: -$ 7.62$ -1.1% Hotel 7.71$ No Inflate annually by Feb - Feb 7.62$ -1.1% change in regional BCI SCMC
Office¹ < 20,000 sf 15.41$ No 17.40.060. 15.24$ -1.1% Office¹ ≥20,000 sf 30.83$ No 30.48$ -1.1%
Other Commercial 7.71$ No 7.62$ -1.1%
Light Industrial < 20,000 sf 7.71$ No 7.62$ -1.1%
Light Industrial ≥20,000 sf 15.41$ No 15.24$ -1.1%
Low-Intensity Uses² 3.08$ No 3.05$ -1.1%
Late Payment Penalty for Multi-Family No Charged by: Date: Objective: Penalty 30 days after due date 25% of Monitoring New Monitoring Fee HCSD Fee
Res. No. Prop 26 Exception: 5
Collected by:

HCSD Full Cost: N/A
5 - 5Reference: CMD 109
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Rezoning Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 3
Rezone Single Lot to R1 9,158.00$ Yes Development Res. No. 23-9221 Full Cost: 12,213.00$ 9 ,478.00$ 3 .5% per application per application
Collected by:

Non-Planned Development (PD) 20,792.00$ Yes Finance Full Cost: 22,899.38$ D eveloper specific 21,519.00$ 3 .5% Planned Development (PD) 59,000.00$ Yes Full Cost: 61,065.00$ D eveloper specific 61,065.00$ 3 .5% Development Area Plan Related to a 38,350.00$ Yes Full Cost: 39,692.25$ 3 9,692.00$ 3 .5% PD-MC Rezoning
Zoning Clearance Charged by: Date: 4/23/2024 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
Zoning Clearance for Home Occupancy 295.00$ Yes Development Res. No. 24-9316 Full Cost: 305.33$ 3 05.00$ 3 .4% Zoning Clearance for Live Entertainment 295.00$ Yes Collected by: Full Cost: 305.33$ 3 05.00$ 3 .4% and Outdoor Dining (up to 24 seats) Finance
Zoning Clearance - Single Family 295.00$ Yes Full Cost: 305.33$ A dding to fee schedule for 305.00$ 3 .4% enhanced clarity.

Zoning Clearance - ABC or DMV Review 295.00$ Yes Full Cost: 305.33$ 3 05.00$ 3 .4% Zoning Clearance - Mobile Food Vendor 590.00$ Yes Full Cost: 610.65$ 6 10.00$ 3 .4% Other, Non-Single Family
Zoning Code Text Amendment 26,550.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Developer specific 27,479.00$ 3 .5% per application Community per application
Development Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected by: Full Cost: 27,479.25$
Finance
Variance - Single Family 3,500.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Below cost recovery to 3,622.00$ 3 .5% per application Community encourage single-family per application Development Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 planning Collected by: Full Cost: 18,319.50$
Finance
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 6 - 1
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Variance - All Others 10,405.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 10,769.00$ 3.5% per application Community per application
Development Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 Collected by: Full Cost: 18,319.50$
Finance
Minor Modifications Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
Single Family 590.00$ Yes Development Res. No. 23-9221 Full Cost: 610.65$ 610.00$ 3.4% All Others 1,475.00$ Yes Collected by: Full Cost: 1,526.63$ 1,526.00$ 3.5% Finance
Off-Site Parking Permit (Citywide) 1,475.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 1,526.00$ 3.5% Community
Off-Site Parking Permit (Events north of 1,475.00$ Yes Development Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 Subject to April PCI 1,526.00$ 3.5% 101) per permit, per year for figure to be effective July 1 per permit, per year for events north of 101 Collected by: Full Cost: 1,526.63$ each year events north of 101 Finance

AND AND
Collected from persons
Off-Site Parking Facilities (Events north of 6.71$ No Date: 4/23/2024 Objective: Recover Cost obtaining off-site parking 6.94$ 3.5% 101) per space, per event permit from Zoning per space, per event north of 101 Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 Administrator and for each north of 101 parking space for sports
Full Cost: or entertainment venues
north of Highway 101.

Use Permit Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 3
Use Permit - Standard 14,554.00$ Yes Development Res. No. 23-9221 Full Cost: 24,426.00$ 15,063.00$ 3.5% per application per application
Collected by:

Use Permit - Minor (Single Family) 6,288.00$ Yes Finance Full Cost: 12,213.00$ 1,229.00$ -80.5% per application per application
Use Permit - Minor (All Other) 6,288.00$ Full Cost: 12,213.00$ 6,508.00$ 3.5% per application per application
Reference: CMD 109 6 - 2
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Temporary Use Permit Objective: Recover Cost
Prop 26 Exception: 3
Temporary Use Permit - Planning 2,950.00$ Yes Charged by: Date: 4/18/2023 Full Cost: 3,053.25$ 3,053.00$ 3.5% Commission Referral per application Community per application Development Res. No. 23-9221
Temporary Use Permit - Administrative 278.00$ Yes Full Cost: 3,053.25$ 287.00$ 3.2% Approval (Non Profit) Collected by:

Finance
Temporary Use Permit - Administrative 1,475.00$ Yes Full Cost: 1,526.63$ 1,526.00$ 3.5% Approval
Maps Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3, 6
4 or Fewer Lots 17,700.00$ Yes Development Res. No. 23-9221 Full Cost: 18,319.50$ 18,319.00$ 3.5% 5 or More Lots 23,600.00$ Yes Collected by: Full Cost: 24,426.00$ 24,426.00$ 3.5% Finance
Lot Line Adjustment 5,900.00$ Yes Full Cost: 6,106.50$ 6,106.00$ 3.5% per application per application
Appeals Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2
From Non-Applicant Resident 523.00$ Yes Development Res. No. 23-9221 Full Cost: 24,426.00$ Below cost recovery to 541.00$ 3.4% per request encourage single-family per request
Collected by: planning
All Others 10,482.00$ Yes Finance Full Cost: 24,426.00$ 10,848.00$ 3.5% Charged by: Date: Objective: Recover Cost
Mailed Notices (2x) Community Prop 26 Exception: 1, 2
a) Beginning of Project No Development Res. No. Full Cost: varies Actual Cost New b) Prior to Completion No Collected by: Full Cost: varies Actual Cost New Finance
Reference: CMD 109 6 - 3
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reposting of Public Notification Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2
Single Family 130.00$ Yes Development Res. No. 23-9221 Full Cost: 1,221.30$ Below cost recovery to 134.00$ 3.1% per application encourage single-family per application Collected by: planning
Non-Single Family 1,180.00$ Yes Finance Full Cost: 1,221.30$ 1,221.00$ 3.5% per application per application
Re-Noticing in Newspaper At Cost Yes Full Cost: Cost Unchanged - Refer to Current Fee
Annexation of Territory to City of 41,300.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 42,745.00$ 3.5% Santa Clara per application Community per application
Development Res. No. 23-9221 Prop 26 Exception: 1, 2, 3, 6 Developer Specific
Collected by: Full Cost: 42,745.50$
Finance
Architectural Review Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
Over the Counter -$ Yes Development Res. No. 23-9221 Full Cost: 152.66$ Unchanged - Refer to Current Fee
Accessory Dwelling Unit / Junior 295.00$ Yes Collected by: Full Cost: 305.33$ 305.00$ 3.4% Accessory Dwelling Unit Finance
Minor Amendment to Approved Project
a) Single Family 885.00$ Yes Full Cost: 915.98$ Below cost recovery to 305.00$ -65.5% b) All Other 885.00$ Yes Full Cost: 915.98$ encourage single-family 915.00$ 3.4% planning
Single Family Residential Going to DRH 1,188.00$ Yes Full Cost: 12,213.00$ Below cost recovery to 1,229.00$ 3.5% encourage single-family
New Development - Non-SFR 35,400.00$ Yes Full Cost: 36,639.00$ planning 36,639.00$ 3.5% SB 9 Review 1,770.00$ Yes Full Cost: 1,831.95$ 916.00$ -48.2% SB 35 Review 23,600.00$ Yes Full Cost: 24,426.00$ 24,426.00$ 3.5% Design Consultant Review Deposit of consultant Yes Full Cost: -$ Unchanged - Refer to estimated costs, plus Current Fee
citywide overhead
Reference: CMD 109 6 - 4
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Environmental Review Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
City Review of Draft EIR and Preparation 35,400.00$ Yes Development Res. No. 23-9221 Full Cost: 36,639.00$ 36,639.00$ 3.5% of Final EIR per application per application
Collected by:

City Review of Supplemental EIR / 17,700.00$ Yes Finance Full Cost: 18,319.50$ 18,319.00$ 3.5% Final EIR
City Review of NEPA 17,700.00$ Yes Full Cost: 18,319.50$ Adding to fee schedule 18,319.00$ 3.5% for enhanced clarity
City Review or Preparation of Initial Study / 23,600.00$ Yes Full Cost: 24,426.00$ 24,426.00$ 3.5% MND and Negative Declaration per application per application Exemption 885.00$ Yes Full Cost: 915.98$ 915.00$ 3.4% Exemption (SFR or Paperless) -$ Yes Full Cost: 152.66$ Unchanged - Refer to Current Fee
Recordation of Exemption (NOE) 590.00$ Yes Full Cost: 610.65$ 610.00$ 3.4% AB 52 Tribal Consultation 885.00$ Yes Full Cost: 915.98$ 915.00$ 3.4% Re-Use of Prior Environmental 1,770.00$ Yes Full Cost: 1,831.95$ 1,831.00$ 3.4% Determination
Addendum to Prior Environmental 4,720.00$ Yes Full Cost: 4,885.20$ 4,885.00$ 3.5% Determination
General Plan Amendment Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 6
Single Family 2,976.00$ Yes Development Res. No. 23-9221 Full Cost: 12,213.00$ 3,080.00$ 3.5% Up to One Acre 23,600.00$ Yes Collected by: Full Cost: 24,426.00$ Developer Specific 24,426.00$ 3.5% per application Finance per application
One to Five Acres 35,400.00$ Yes Full Cost: 36,639.00$ 36,639.00$ 3.5% Over Five Acres 41,300.00$ Yes Full Cost: 42,745.50$ 42,745.00$ 3.5% Reference: CMD 109 6 - 5
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Development Agreement 35,400.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Developer Specific 36,639.00$ 3.5% per application Community Prop 26 Exception: 1, 2, 6 per application Development Res. No. 23-9221 Full Cost: 36,639.00$
Amendment or Cancellation of 11,800.00$ Yes 12,213.00$ 3.5% Development Agreement per application Collected by: Full Cost: 12,213.00$ per application Finance
Development Agreement Negotiations Actual Cost No Full Cost: Cost Unchanged - Refer to Current Fee
Certificate of Compliance 2,360.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 2,442.00$ 3.5% per certificate Community per certificate
Development Res. No. 23-9221 Prop 26 Exception: 1, 2, 6 Collected by: Full Cost: 2,442.60$
Finance
Signs Charged by: Date: 4/18/2023 Objective: Recover Cost Sign Permit Fees (attached or ground) 348.00$ Yes Community Prop 26 Exception: 3 360.00$ 3.4% for First Sign per application Development Res. No. 23-9221 Full Cost: 610.65$ per application Temporary Sign Permit / Street Banner 85.00$ Yes Collected by: Full Cost: 152.66$ 87.00$ 2.4% (Pursuant to Zoning Ordinance Sec 40-27); per application Finance per application Good for 60 Days; or ea. Additional Sign
Under a Sign Permit Application
Temporary Sign Removal Fees 147.00$ Yes Full Cost: 152.66$ Fees to be paid prior to 152.00$ 3.4% per sign retrieval of signs to any per sign
person.

Comprehensive Sign Program 4,425.00$ Yes Full Cost: 4,579.88$ 4,579.00$ 3.5% Mills Act Application 8,451.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 8,746.00$ 3.5% per application Community per application
Development Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected by: Full Cost: 12,213.00$
Finance
Reference: CMD 109 6 - 6
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Charged by: Date: Objective: Recover Cost
Mills Act Plaque Community Prop 26 Exception: 1, 2
a) Small No Development Res. No. Full Cost: varies Actual Cost New b) Large No Collected by: Full Cost: varies Actual Cost New Finance
Pre-Application Charged by: Date: 4/18/2023 Objective: Recover Cost Pre-Application fee credited Community Prop 26 Exception: 1, 2, 3, 6 toward cost of full application Single Family 522.00$ Yes Development Res. No. 23-9221 Full Cost: 2,442.60$ fee if submitted within 3 540.00$ 3.4% months after completion of
Planning Review 3,491.00$ Yes Collected by: Full Cost: 4,885.20$ preliminary review. 3,613.00$ 3.5% Finance
Project Clearance Committee 5,900.00$ Yes Full Cost: 6,106.50$ 6,106.00$ 3.5% SB 330 Review 5,900.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Adding to fee schedule for 6,106.00$ 3.5% Community enhanced clarity
Development Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 6,106.50$
Finance
Flood Zone Verification 295.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 305.00$ 3.4% Community
Development Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected by: Full Cost: 305.33$
Finance
Zoning Verification 508.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 525.00$ 3.3% Community
Development Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected by: Full Cost: 915.98$
Finance
Reference: CMD 109 6 - 7
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Historical & Landmarks Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2 Below cost recovery
Single Family 980.00$ Yes Development Res. No. 23-9221 Full Cost: 9,159.75$ to encourage historical 1,014.00$ 3.5% designation
All Others 11,800.00$ Yes Collected by: Full Cost: 9,159.75$ single-family planning 4,580.00$ -61.2% Finance
Stormwater Management Plan 885.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 915.00$ 3.4% Review Community
Development Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected by: Full Cost: 915.98$
Finance
Tree Removal Permit Charged by: Date: 4/23/2024 Objective: Recover Cost Community Prop 26 Exception: 1, 2 Below cost recovery to Single Family Residence 295.00$ Yes Development Res. No. 24-9316 Full Cost: 610.65$ encourage single-family 305.00$ 3.4% planning
All Others 590.00$ Yes Collected by: Full Cost: 610.65$ 610.00$ 3.4% Finance Tree removal replacement fee
Tree Removal Replacement - Off-Site 653.00$ Yes Full Cost: intended to match street tree per tree planting fee amount shown in
PW section of fee schedule
Heritage Tree Removal 832.00$ Yes Full Cost: 2,442.60$ Below cost recovery to 861.00$ 3.5% encourage single-family
planning
Non-Historical Referral to Historical and 523.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Landmarks Commission - Standard Community
Development Res. No. 23-9221 Prop 26 Exception: 2, 3, 6 Collected by: Full Cost:

Finance
Non-Historical Referral to Historical and 980.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost Landmarks Commission - Comprehensive Community
Development Res. No. 23-9221 Prop 26 Exception: 2, 3, 6 Collected by: Full Cost:

Finance
Reference: CMD 109 6 - 8
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Contract Administration Actual Cost No Charged by: Date: 6/22/2021 Objective: Recover Cost Unchanged - Refer to Community Current Fee
Development Res. No. 21-8981 Prop 26 Exception: 1, 2
Collected by: Full Cost: Actual Cost
Finance
In-House Planning Rate for Services 295.00$ No Charged by: Date: 4/18/2023 Objective: Recover Cost 305.00$ 3.4% Provided and Not Listed Elsewhere Community
in this Schedule (per hour) Development Res. No. 23-9221 Prop 26 Exception: 1, 2 Collected by: Full Cost: 305.33$
Finance
Preparation or Peer Review of Technical Pass-Through of Actual No Charged by: Date: 4/23/2024 Objective: Recover Cost Unchanged - Refer to Report Cost plus 10% Community Current Fee
Admin Fee Development Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by: Full Cost: Actual Cost
Finance
Time Extensions Charged by: Date: 4/23/2024 Objective: Recover Cost Community
Administrative Entitlement Extension 295.00$ No Development Res. No. 24-9316 Prop 26 Exception: 1, 2 305.00$ 3.4% Processing Time Extension 25% of application fee No Collected by: Full Cost:

Finance
Code Enforcement Re-Inspection Fee 277.00$ Yes Charged by: Date: 4/18/2023 Objective: Recover Cost 286.00$ 3.2% Community
Development Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 Collected by: Full Cost: 288.77$
Finance
Reference: CMD 109 6 - 9
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Short-Term Rental Permit Charged by: Date: Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
New Yes Development Res. No. Full Cost: 385.00$ 385.00$ New Renewal Yes Collected by: Full Cost: 385.00$ 385.00$ New Finance
Significant Property Alteration Charged by: Date: 4/18/2023 Objective: Recover Cost Applies to historic Community Prop 26 Exception: 1, 2, 3 preservation properties only.

Major - Single Family 980.00$ Yes Development Res. No. 23-9221 Full Cost: 12,213.00$ Subject to Historical & 1,014.00$ 3.5% Landmark Commission
Major - Other 11,800.00$ Yes Collected by: Full Cost: 12,213.00$ approval. 12,213.00$ 3.5% Finance
Significant Property Alteration Charged by: Date: 4/18/2023 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
Minor - Single Family 654.00$ Yes Development Res. No. 23-9221 Full Cost: 9,159.75$ Applies to historic 676.00$ 3.4% preservation properties only.

Minor - Other 2,079.00$ Yes Collected by: Full Cost: 9,159.75$ 2,151.00$ 3.5% Finance
Transportation Demand Management Fee No Charged by: Date: Objective: Recover Cost 2,992.00$ New Community
Development Res. No. Prop 26 Exception: 1, 2, 3
Collected by: Full Cost: 2,992.60$
Finance
Specific Plan Fee - Lawrence Station Charged by: Date: 4/23/2024 Objective: Recover Cost Fees adjusted annual using Area Plan (LSAP) Community December CPI factor from
Development Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 previous year.

Phase I Developers 24,408.57$ No 24,989.49$ 2.4% per acre Collected by: Full Cost: 1,080,148.77$ Fees collected at the time of per acre Finance Building Permit Application
Phase II Developers 15,609.32$ No 15,980.82$ 2.4% per acre per acre
Reference: CMD 109 6 - 10
Department / Division: Community Development / Planning Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Specific Plan Fee- Tasman East 308.82$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Fees adjusted annual using 316.17$ 2.4% Specific Plan Area (TESP) per unit Community December CPI factor from per unit Development Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 previous year.

Collected by: Full Cost: 1,256,824.31$ Fees collected prior to Finance Architectural Committee
Review.

Patrick Henry Drive CFD Formation Charged by: Date: Objective: Recover Cost Community Prop 26 Exception: 1, 2, 6
Applications Received Before July 1, 2023 810.81$ No Development Res. No. 839.19$ 3.5% Fee due prior to issuance of Certificate per acre Full Cost: 62,100.00$ per acre of Occupancy Collected by: Full Cost (per acre): 839.19$ Finance
Applications Received On/After July 1, 810.81$ No 839.19$ 3.5% 2023, fee due prior to issuance of per acre per acre
Certificate of Occupancy
Reference: CMD 109 6 - 11

Department / Division: Electric Utility Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Overhead Lines - New 1,340.01$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 1,386.91$ 3.5% Single Family/Residential per lot Electric Utility per lot Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 1,386.91$
Overhead Lines - New 824.08$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 852.92$ 3.5% Multiple Units per unit Electric Utility per unit
Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 852.92$
Overhead Lines - New 8.30$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 8.59$ 3.5% Street Lighting per front foot Electric Utility per front foot Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 8.59$
Underground - New 2,642.13$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 2,734.60$ 3.5% Single Family/Residential per lot Electric Utility per lot Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 3,928.08$
Underground - New 2,245.81$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 2,324.41$ 3.5% Multiple Units/Residential per unit Electric Utility per unit Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 3,338.87$
Underground - New 20.40$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 21.11$ 3.5% Street Lighting per front foot Electric Utility per front foot Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 21.11$
Underground - Existing 3,881.08$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 4,016.92$ 3.5% Single Family per lot Electric Utility per lot
Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 4,016.92$
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 7 - 1
Department / Division: Electric Utility Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Underground - Existing 2,074.50$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 2,147.11$ 3. 5% Multi-Units per unit Electric Utility per unit
Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 2,147.11$
Underground - Existing 30.31$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 31.37$ 3. 5% Street Lighting per front foot Electric Utility per front foot Res. No. 24-9316 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 31.37$
Load Development Charged by: Date: 4/23/2024 Objective: Recover Cost Facilities < 12kV 609.07$ No Electric Utility
Fees will be updated via
separate study. 630. 39$ 3. 5%
per kVA Res. No. 24-9316 Prop 26 Exception: 6 per kVA
Collected by:

Commercial Facilities 12kV 508.94$ No Finance Full Cost: See 526.75$ 3. 5% per kVA Comments per kVA
Customer Facilities 631.09$ No 653.18$ 3. 5%
Dedicated 12kV per kVA per kVA
Customer Facilities 588.23$ No 608.82$ 3. 5%
Dedicated 60kV per kVA per kVA
Temporary Connection to Pole 798.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 825.00$ 3. 4% Electric Utility
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 825.93$
Temporary Power Actual labor, No Charged by: Date: 4/23/2024 Objective: Recover Cost Unchanged - Refer to materials and Electric Utility Current Fee
equipment costs, Res. No. 24-9316 Prop 26 Exception: 1, 2 including overhead Collected by:

Finance Full Cost: Actual Cost
Reference: CMD 109 7 - 2
Department / Division: Electric Utility Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Underground Street Light Relocation Actual labor, No Charged by: Date: Objective: Recover Cost Unchanged - Refer to materials and Electric Utility Current Fee
equipment costs, Res. No. Prop 26 Exception: 1, 2
including overhead Collected by:

Finance Full Cost: Actual Cost
Service Wire Relocation from Mid-Span 4,187.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 4,333.00$ 3.5% Electric Utility
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 4,334.32$
Service Wire Relocation from Pole 1,342.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 1,388.00$ 3.4% Electric Utility
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 1,388.97$
Meter Test Deposit 238.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 246.00$ 3.4% Electric Utility
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance / Full Cost: 246.33$
Municipal Serv.

Service Wire Relocation Actual labor, No Charged by: Date: 6/22/2021 Objective: Recover Cost Unchanged - Refer to Additional Linework materials and Electric Utility Current Fee Includes: equipment costs, Res. No. 21-8981 Prop 26 Exception: 1, 2 Labor Costs including overhead Collected by:

Material Costs Finance Full Cost: As calculated
Equipment Costs
Electric System Damage Actual labor, No Charged by: Date: 6/22/2021 Objective: Recover Cost Unchanged - Refer to Includes: materials and Electric Utility Current Fee
Labor Costs equipment costs, Res. No. 21-8981 Prop 26 Exception: 1, 2 Material Costs including overhead Collected by:

Equipment Costs Finance Full Cost: As calculated
Reference: CMD 109 7 - 3
Department / Division: Electric Utility Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Service Reconnection Residential 199.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 205.00$ 3.0% Electric Utility
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance / Full Cost: 206.48$
Municipal Serv.

Service Disconnection Residential 199.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 205.00$ 3.0% Electric Utility
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance / Full Cost: 206.48$
Municipal Serv.

Electric Reconnection Fee - 133.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 137.00$ 3.0% Non-Residential Electric Utility Penalty
Res. No. 24-9316 Prop 26 Exception: 1, 2, 5
Collected by:

Finance / Full Cost: 137.66$
Municipal Serv.

Electric Disconnection Fee - 133.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 137.00$ 3.0% Non-Residential Electric Utility Penalty
Res. No. 24-9316 Prop 26 Exception: 1, 2, 5
Collected by:

Finance / Full Cost: 137.66$
Municipal Serv.

Service Fee Customer- 266.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 275.00$ 3.4% Owned Equipment Problem per hour Electric Utility per hour Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 275.31$
Electric replacement / reconnection fee 266.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 275.00$ 3.4% due to meter tampering / illegal access per account Electric Utility Penalty per account Fee to fix meter plus Res. No. 24-9316 Prop 26 Exception: 1, 2, 5 Fee to fix meter plus two (2) times estimated Collected by: two (2) times estimated cost of services used Finance / Electric Rules and Full Cost: 275.31$ cost of services used Municipal Serv. Regulations #7B
Reference: CMD 109 7 - 4
Department / Division: Electric Utility Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Service Removal Actual labor, No Charged by: Date: Objective: Recover Cost Unchanged - Refer to materials and Electric Utility Current Fee
equipment costs, Res. No. Prop 26 Exception: 1, 2
including overhead Collected by:

Finance Full Cost: Actual Cost
Engineering Plan Check - Electric 453.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost For reviewing Encroachment 468.00$ 3.3% (per sheet) - Includes 3 checks per sheet Electric Utility Permit plans that have no per sheet Res. No. 24-9316 Prop 26 Exception: 2, 3 electric services request.

Collected by: For conflicts with existing
Finance Full Cost: 469.11$ electric infrastructure.

Engineering Plan Check - Electric 64.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost For reviewing Encroachment 66.00$ 3.1% (per sheet) - 4th and subsequent per sheet Electric Utility Permit plans that have no per sheet review Res. No. 24-9316 Prop 26 Exception: 2, 3 electric services request.

Collected by: For conflicts with existing
Finance Full Cost: 67.02$ electric infrastructure.

Project Clearance Committee / 837.00$ No Charged by: Date: 4/18/2023 Objective: Recover Cost 866.00$ 3.5% Sub Committee review Electric Utility
Res. No. 23-9221 Prop 26 Exception: 2, 3
Collected by:

Finance Full Cost: 866.30$
Time of Use Meter Installation - 444.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 459.00$ 3.4% Residential per meter Electric Utility per meter
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance / Full Cost: 459.81$
Municipal Serv.

Time of Use Meter Installation - 650.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 672.00$ 3.4% Non-Residential per meter Electric Utility per meter
Res. No. 24-9316 Prop 26 Exception: 2, 3
Collected by:

Finance / Full Cost: 673.30$
Municipal Serv.

Reference: CMD 109 7 - 5
Department / Division: Electric Utility Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Field Marking-Fiber 150.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 155.00$ 3.3% Up to 50 ft of excavation Electric Utility
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 155.25$
Field Marking-Fiber 100.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 103.00$ 3.0% Over 50 ft. of excavation per each additional Electric Utility per each additional 50 ft. of excavation Res. No. 24-9316 Prop 26 Exception: 2 50 ft. of excavation Collected by:

Finance Full Cost: 103.50$
Electric equipment relocation Actual labor, No Charged by: Date: Objective: Recover Cost Per Electric Rules and Unchanged - Refer to materials and Electric Utility Regulations Section 6.C Current Fee equipment costs, Res. No. Prop 26 Exception: 2
including overhead Collected by:

Finance Full Cost: Actual Cost
SVP System Impact Study - 81,400.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 84,249.00$ 3.5% Transmission System Electric Utility
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

CAISO System Impact Study 134,800.00$ No Finance Full Cost: See Total cost with CAISO Inter- 139,518.00$ 3.5% Comment connection Study if required.

SVP System Impact Study - 16,200.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 16,767.00$ 3.5% Distribution 12kV system Electric Utility
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 16,853.94$
SVP Generation Interconnection Study 16,200.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 16,767.00$ 3.5% Electric Utility
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 16,853.94$
Reference: CMD 109 7 - 6
Department / Division: Electric Utility Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Distribution Pole Contact - Application Fee 247.84$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Resolution #16-8285 254.04$ 2.5% per pole in application Electric Utility Under CA Public Utilities Code 2.5% annual escalation per per pole in application Res. No. 24-9316 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the amount allowable under PU
Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Distribution Pole Contact - Cable 18.50$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Resolution #16-8285 18.96$ 2.5% Attachment per each attachment Electric Utility Under CA Public Utilities Code 2.5% annual escalation per per each attachment Res. No. 24-9316 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU 2.5% annual escalation Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Distribution Pole Contact - Equipment 52.51$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Resolution #16-8285 53.82$ 2.5% Attachment per each attachment Electric Utility Under CA Public Utilities Code 2.5% annual escalation per per each attachment Res. No. 24-9316 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU 2.5% annual escalation Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Distribution Pole Contact - Riser 38.88$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Resolution #16-8285 39.85$ 2.5% Attachment per each attachment Electric Utility Under CA Public Utilities Code 2.5% annual escalation per per each attachment Res. No. 24-9316 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU 2.5% annual escalation Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Reference: CMD 109 7 - 7
Department / Division: Electric Utility Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Distribution Pole Contact - Anchor 3.61$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Resolution #16-8285 3.70$ 2.5% Attachment per each attachment Electric Utility Under CA Public Utilities Code 2.5% annual escalation per per each attachment Res. No. 24-9316 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU 2.5% annual escalation Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Distribution Pole Contact - Small Cell 94.08$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Resolution #16-8285 96.43$ 2.5% per each contact Electric Utility Under CA Public Utilities Code 2.5% annual escalation per per each contact Res. No. 24-9316 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU 2.5% annual escalation Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Reference: CMD 109 7 - 8

Department / Division: Finance / Municipal Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Business Tax Charged by: Date: 4/18/2023 Objective: User Fee The surcharge for apartment Rental Unit Surcharge 3.35$ No Finance rental mediation was 3.16$ -5.7% Apartments with 3+ Units per unit, per year Res. No. 23-9221 Prop 26 Exception: 1, 2 previously presented with the per unit, per year Collected by: Apartment Rental Unit
Finance - Muni Full Cost: 3.47$ Business Tax. Because the Services - surcharge is a fee rather
Business Tax than a tax, it remains in the
Municipal Fee Schedule.

Delinquent payment of 25% of appropriate No Charged by: Date: 11/8/2022 Objective: Penalty The Business Tax schedule is Unchanged - Refer to business - 30 days after due date business license Finance posted online at the City of Current Fee tax Res. No. 22-9130 Prop 26 Exception: 5 Santa Clara's Finance - Collected by: Business Tax & License page.

Finance - Muni Full Cost: N/A
Services -
Business Tax
Change of name, address or 13.00$ No Charged by: Date: 4/23/2024 Objective: User Fee Unchanged - Refer to business type as shown on per each update Finance Current Fee current certificate Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by:

Finance - Muni Full Cost: 13.63$
Services -
Business Tax
Business Certificate Info. Actual Cost of No Charged by: Date: 6/11/1996 Objective: User Fee Unchanged - Refer to Special Request Compilation Finance Current Fee
(Research Required) Res. No. Prop 26 Exception: 1, 2
Collected by:

Finance - Muni Full Cost: Actual Cost
Services -
Business Tax
Duplicate business certificate 13.00$ No Charged by: Date: 4/23/2024 Objective: User Fee Unchanged - Refer to each Finance Current Fee
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance - Muni Full Cost: 13.63$
Services -
Business Tax
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 8 - 1
Department / Division: Finance / Municipal Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Amplified Music Permit 79.00$ No Charged by: Date: 4/23/2024 Objective: User Fee 81.00$ 2.5% Finance
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: City Code Section:

Finance 9.05.060 (c) (2) Full Cost: 81.77$
City Flag Actual Cost No Charged by: Date: Objective: Recover Cost City Council Approved Policy Unchanged - Refer to Finance 7/20/1993. Current Fee
Res. No. Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: Actual Cost
Block Party Request No Charge No Charged by: Date: 6/15/2010 Objective: User Fee Fee waived to promote Unchanged - Refer to Finance community spirit. Current Fee
Res. No. Prop 26 Exception: N/A
Collected by:

Finance Full Cost: 81.77$
Utility service deposit - commercial, Estimated three (3) No Charged by: Date: 8/9/1966 Objective: Recover Cost Unchanged - Refer to industrial and residential month's usage based Municipal Serv Current Fee on history and / or Res. No. Prop 26 Exception: 1, 2
projected load Collected by:

Municipal Serv Full Cost: As calculated
Service turn-on fee (for each service) Charged by: Date: 4/18/2023 Objective: Recover Cost Municipal Serv
Electric 48.00$ No Res. No. 23-9221 Prop 26 Exception: 1, 2 49.00$ 2.1% Collected by:

Water 48.00$ No Municipal Serv Full Cost: 50.48$ 49.00$ 2.1% Billing service charge for late payment - 15.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Unchanged - Refer to residential, commercial and industrial or 1.5% per account, Municipal Serv Penalty Current Fee whichever greater Res. No. 24-9316 Prop 26 Exception: 1, 2, 5 Collected by:

Municipal Serv Full Cost: 16.04$
Delinquent Service Letter 55.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 56.00$ 1.8% (48 hour notice) per account Municipal Serv Penalty per account Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Municipal Serv Full Cost: 57.27$
Reference: CMD 109 8 - 2
Department / Division: Finance / Municipal Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Fees for the verification of 147.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 152.00$ 3.4% electric meter address (aka "ring out") per address Municipal Serv per address plus Res. No. 24-9316 Prop 26 Exception: 1, 2 plus
Collected by:

5.00$ No Municipal Serv Full Cost: 152.49$ * Per meter full cost is $12 Unchanged - Refer to per meter * Current Fee
Utility Billing Splitting 164.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 169.00$ 3.0% or Combining Accounts per account Municipal Serv per account Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Municipal Serv Full Cost: 169.74$
Municipal Services Information Charged by: Date: 6/12/2001 Objective: Recover Cost Municipal Serv
Special Request (Request Research) Actual Cost of No Res. No. Prop 26 Exception: 1, 2 Unchanged - Refer to Compilation Collected by: Current Fee
Municipal Serv Full Cost: Actual Cost
10-day letter for house meter for up to 139.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 143.00$ 2.9% 10 units Municipal Serv
Res. No. 24-9316 Prop 26 Exception: 1, 2
For each full or partial increment of 22.00$ No Collected by: Unchanged - Refer to 10 thereafter Municipal Serv Full Cost: 144.56$ Current Fee Meter reading more than once per month 95.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 98.00$ 3.2% 1st meter per location Municipal Serv
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Municipal Serv Full Cost: 98.50$
Delinquent Reconnect Fee 83.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 85.00$ 2.4% per account Municipal Serv Penalty per account
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Municipal Serv Full Cost: 85.91$
Reference: CMD 109 8 - 3

Department / Division: Fire / Training Fee Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Training Fee Charged by: Date: 4/23/2024 Objective: Recover Cost CPR – Adult Heart Saver (4 Hours) 1,356.00$ No Fire / Training User Fee 1,403.00$ 3.5% per 6 persons Res. No. 24-9316 Prop 26 Exception: N/A * per 6 persons Collected by:

Fire / Training Full Cost: 1,403.72$
Training Fee Charged by: Date: 4/23/2024 Objective: Recover Cost CPR – Adult / Pediatric Heart Saver 1,898.00$ No Fire / Training User Fee 1,964.00$ 3.5% (6 Hours) per 6 persons Res. No. 24-9316 Prop 26 Exception: N/A * per 6 persons Collected by:

Fire / Training Full Cost: 1,965.21$
Training Fee Charged by: Date: 4/23/2024 Objective: Recover Cost First Aid (4 Hours) 1,356.00$ No Fire / Training User Fee 1,403.00$ 3.5% per 6 persons Res. No. 24-9316 Prop 26 Exception: N/A * per 6 persons Collected by:

Fire / Training Full Cost: 1,403.72$
Training Fee Charged by: Date: 4/23/2024 Objective: Recover Cost PALS / ACLS Recognition (2 Days) 3,066.00$ No Fire / Training User Fee 3,173.00$ 3.5% per 6 persons Res. No. 24-9316 Prop 26 Exception: N/A * per 6 persons Collected by:

Fire / Training Full Cost: 3,174.00$
Training Fee Charged by: Date: 4/23/2024 Objective: Recover Cost PALS / ACLS Re-Recognition (1 Day) 1,533.00$ No Fire / Training User Fee 1,586.00$ 3.5% per 6 persons Res. No. 24-9316 Prop 26 Exception: N/A * per 6 persons Collected by:

Fire / Training Full Cost: 1,587.00$
Training Fee Charged by: Date: 4/23/2024 Objective: Recover Cost Fire Extinguisher Training (2 Hours) 412.00$ No Fire / Training User Fee 426.00$ 3.4% Does not include fees for fire extinguisher Limit 12 persons Res. No. 24-9316 Prop 26 Exception: N/A * Limit 12 persons use. Collected by:

Fire / Training Full Cost: 427.20$
Training Fee Charged by: Date: 4/23/2024 Objective: Recover Cost Safety and Evacuation Lecture (2 Hours) 445.00$ No Fire / Training User Fee 460.00$ 3.4% Limit 20 persons Res. No. 24-9316 Prop 26 Exception: N/A * Limit 20 persons Collected by:

Fire / Training Full Cost: 461.35$
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 9 - 1
Department / Division: Fire / Rental and Resource Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Facility Rental Fee Charged by: Date: 4/23/2024 Objective: User Fee Headquarters’ Conference Room Rental 208.00$ No Fire 215.00$ 3.4% per hour Res. No. 24-9316 Prop 26 Exception: 4 per hour Collected by:

Fire / Full Cost: 215.80$
Administration
Facility Rental Fee Charged by: Date: 4/23/2024 Objective: User Fee Training Center: Classroom 208.00$ No Fire 215.00$ 3.4% (Limit 80 persons) per hour Res. No. 24-9316 Prop 26 Exception: 4 per hour Collected by:

Fire / Full Cost: 215.80$
Administration
Facility Rental Fee Charged by: Date: 4/23/2024 Objective: User Fee Training Center: Classroom 208.00$ No Fire 215.00$ 3.4% (Limit 30 persons) per hour Res. No. 24-9316 Prop 26 Exception: 4 per hour Collected by:

Fire / Full Cost: 215.80$
Administration
Facility Rental Fee Charged by: Date: 4/23/2024 Objective: User Fee Training Center: Classroom 208.00$ No Fire 215.00$ 3.4% (Limit 20 persons) per hour Res. No. 24-9316 Prop 26 Exception: 4 per hour Collected by:

Fire / Full Cost: 215.80$
Administration
Facility Rental Fee Charged by: Date: 4/23/2024 Objective: User Fee Training Center: Drill Grounds / Tower 208.00$ No Fire 215.00$ 3.4% per hour Res. No. 24-9316 Prop 26 Exception: 4 per hour Collected by:

Fire / Full Cost: 215.80$
Administration
Resource Fees Charged by: Date: 4/23/2024 Objective: User Fee Stand-by 522.00$ No Fire 540.00$ 3.4% (One Engine for Permitted Activity) per hour Res. No. 24-9316 Prop 26 Exception: 1, 2 per hour Collected by:

Fire / Full Cost: 541.05$
Administration

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 2
Department / Division: Fire / Rental and Resource Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Resource Fees Charged by: Date: 4/23/2024 Objective: User Fee Fire Watch (Per Person) 283.00$ No Fire 292.00$ 3.2% per hour Res. No. 24-9316 Prop 26 Exception: 1, 2 per hour Collected by:

Fire / Full Cost: 292.91$
Administration
Resource Fees Charged by: Date: 4/23/2024 Objective: User Fee Water Clean-up – Industrial and 533.00$ No Fire 551.00$ 3.4% Commercial (1 Engine) per hour Res. No. 24-9316 Prop 26 Exception: 1, 2 per hour Collected by:

Fire / Full Cost: 551.66$
Administration
Resource Fees Charged by: Date: 4/23/2024 Objective: User Fee Water Clean-up – Industrial and 697.00$ No Fire 721.00$ 3.4% Commercial (1 Truck) per hour Res. No. 24-9316 Prop 26 Exception: 1, 2 per hour Collected by:

Fire / Full Cost: 721.40$
Administration
Resource Fees Charged by: Date: 4/23/2024 Objective: User Fee Water Clean-up – Industrial and 175.00$ No Fire 181.00$ 3.4% Commercial (1 Haz-Mat) per hour Res. No. 24-9316 Prop 26 Exception: 1, 2 per hour Collected by:

Fire / Full Cost: 181.13$
Administration
Resource Fees Charged by: Date: 4/23/2024 Objective: User Fee Water Clean-up – Industrial and 257.00$ No Fire 265.00$ 3.1% Commercial (1 Battalion Chief) per hour Res. No. 24-9316 Prop 26 Exception: 1, 2 per hour Collected by:

Fire / Full Cost: 266.00$
Administration
Resource Fees Charged by: Date: 4/23/2024 Objective: User Fee DUI Fire Response 533.00$ No Fire 551.00$ 3.4% per hour Res. No. 24-9316 Prop 26 Exception: 1, 2 per hour Collected by:

Fire / Full Cost: 551.66$
Administration
Reference: CMD 109 9 - 3
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Alternate Materials, Design and Methods 1,981.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,050.00$ 3.5% of Construction and Equipment Fire / Prevention User Fee over 3 year period Res. No. 24-9316 FY 22/23: 1/3
Collected by: Prop 26 Exception: 1, 2, 3 FY 23/24: 1/3
Fire / Prevention FY 24/25: 1/3
Permit Center Full Cost: 2,050.34$
Automatic Fire Extinguishing Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Special Hazard Systems (including Halon, 1,698.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,757.00$ 3.5% Wet and Dry Chemical Systems, CO2, Collected by: FY 23/24: 1/3 Foam and Similar Systems). Fire / Prevention Full Cost: 1,757.43$ FY 24/25: 1/3 Automatic Fire Extinguishing Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Hood & Duct per system 991.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,025.00$ 3.4% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,025.69$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - New: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
1 - 49 Heads 1,415.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,464.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - New: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
50 - 100 Heads 2,264.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,343.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,343.24$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - New: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
101 - 200 Heads 3,679.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 3,807.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 3,807.77$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - New: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Each additional 100 Heads ( >200 heads) 849.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 878.00$ 3.4% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 878.72$ FY 24/25: 1/3

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 4
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Automatic Fire Sprinkler Systems - Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Existing Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1 - 49 Heads, no calculations 1,061.00$ Yes Collected by: FY 23/24: 1/3 1,098.00$ 3.5% Fire / Prevention Full Cost: 1,098.39$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Existing Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 50 - 100 Heads, no calculations 1,344.00$ Yes Collected by: FY 23/24: 1/3 1,391.00$ 3.5% Fire / Prevention Full Cost: 1,391.04$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Existing Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1 - 49 Heads, with calculations 1,839.00$ Yes Collected by: FY 23/24: 1/3 1,903.00$ 3.5% Fire / Prevention Full Cost: 1,903.88$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Existing Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 50-100 Heads, with calculations 2,122.00$ Yes Collected by: FY 23/24: 1/3 2,196.00$ 3.5% Fire / Prevention Full Cost: 2,196.79$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Existing Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 101-200 Heads, with calculations 3,396.00$ Yes Collected by: FY 23/24: 1/3 3,514.00$ 3.5% Fire / Prevention Full Cost: 3,514.86$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems - Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Existing Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Each additional 100 Heads ( >200 heads) 424.00$ Yes Collected by: FY 23/24: 1/3 438.00$ 3.3% Fire / Prevention Full Cost: 439.36$ FY 24/25: 1/3 Reference: CMD 109 9 - 5
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Building Plans - FIRE 35% of Building Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 35% of Building Department Fee Permit Center User Fee over 3 year period Department Fee $990 minimum Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 $1,025 minimum Collected by: FY 23/24: 1/3
Permit Center Full Cost: 1,025.17$ FY 24/25: 1/3 Building Plans - CUPA 35% of Building Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 35% of Building Department Fee Permit Center User Fee over 3 year period Department Fee $990 minimum Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 $1,025 minimum Collected by: FY 23/24: 1/3
Permit Center Full Cost: 1,025.17$ FY 24/25: 1/3 Fire / Prevention FY 24/25: 1/3
Building Plans - FIRE - Expedited Yes Charged by: Date: Objective: Recover Cost Permit Center User Fee 50% of Build. Permit Fee New
Res. No. Prop 26 Exception: 1, 2, 3 Minimum: OT Fire Fee Collected by: Full Cost: varies
Permit Center
Building Plans - CUPA - Expedited Yes Charged by: Date: Objective: Recover Cost 50% of Build. Permit Fee New Permit Center User Fee Minimum: OT Fire Fee
Res. No. Prop 26 Exception: 1, 2, 3
Collected by: Full Cost: varies
Permit Center
Fire / Prevention
Carnival and Fairs $ 1,415.00 Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery $ 1,464.00 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 Closure of an Onsite Hazardous Waste Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Treatment System: Fire User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Conditionally Authorized and Conditionally 1,132.00$ Yes Collected by: FY 23/24: 1/3 1,171.00$ 3.4% Exempt Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Reference: CMD 109 9 - 6
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Closure of an Onsite Hazardous Waste Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Treatment System: Fire User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Permit by Rule 1,415.00$ Yes Collected by: FY 23/24: 1/3 1,464.00$ 3.5% Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 Compressed Gas Installation 1,981.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,050.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,050.34$ FY 24/25: 1/3 Cooking Oil Storage Tanks 1,415.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,464.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 Emergency Responder Radio Coverage 5,094.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 5,272.00$ 3.5% System Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 5,272.29$ FY 24/25: 1/3 Emergency Alarm Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
New System - No Gas Detection 2,264.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,343.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,343.24$ FY 24/25: 1/3 Emergency Alarm Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire / Prevention User Fee
Modification - No Gas Detection 1,132.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 1,171.00$ 3.4% Collected by:

Fire / Prevention Full Cost: 1,171.62$
Reference: CMD 109 9 - 7
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Emergency Alarm Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
New System - Including Gas Detection 2,830.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,929.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,929.05$ FY 24/25: 1/3 Emergency Alarm Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire / Prevention User Fee
Modification - Including Gas Detection 1,415.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 1,464.00$ 3.5% Collected by:

Fire / Prevention Full Cost: 1,464.53$
Engineering Referrals 1,132.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,171.00$ 3.4% (Parcel maps, public roads, EVAE's, Fire User Fee over 3 year period public fire hydrants) Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Environmental Impact Report Initial 2,264.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,343.00$ 3.5% Review (includes 6 hours of review) Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,343.24$ FY 24/25: 1/3 Environmental Impact Report - each 283.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 292.00$ 3.2% additional hour after initial review Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 292.91$ FY 24/25: 1/3 Exhibit and Trade Shows 1,415.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,464.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 Reference: CMD 109 9 - 8
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Fire Alarm Systems (Non-high rise and Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery R-2 Occupancies: Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1 - 20 Devices 1,132.00$ Yes Collected by: FY 23/24: 1/3 1,171.00$ 3.4% Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Fire Alarm Systems (Non-high rise and Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery R-2 Occupancies: Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 21 - 40 Devices 1,698.00$ Yes Collected by: FY 23/24: 1/3 1,757.00$ 3.5% Fire / Prevention Full Cost: 1,757.43$ FY 24/25: 1/3 Fire Alarm Systems (Non-high rise and Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery R-2 Occupancies: Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 41 - 100 Devices 2,830.00$ Yes Collected by: FY 23/24: 1/3 2,929.00$ 3.5% Fire / Prevention Full Cost: 2,929.05$ FY 24/25: 1/3 Fire Alarm Systems (Non-high rise and Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery R-2 Occupancies: Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 101 - 200 Devices 3,679.00$ Yes Collected by: FY 23/24: 1/3 3,807.00$ 3.5% Fire / Prevention Full Cost: 3,807.77$ FY 24/25: 1/3 Fire Alarm Systems (Non-high rise and Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery R-2 Occupancies: Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Each additional 50 Devices 566.00$ Yes Collected by: FY 23/24: 1/3 585.00$ 3.4% ( >200 devices) Fire / Prevention Full Cost: 585.81$ FY 24/25: 1/3 Fire Alarm Systems with pre-wire Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery inspection required (high rise and R-2 Fire / Prevention User Fee over 3 year period Occupancies):

Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1 - 20 Devices 1,415.00$ Yes Fire / Prevention FY 23/24: 1/3 1,464.00$ 3.5% Full Cost: 1,464.53$ FY 24/25: 1/3
Reference: CMD 109 9 - 9
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Fire Alarm Systems with pre-wire Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery inspection required (high rise and R-2 Fire / Prevention User Fee over 3 year period Occupancies):

Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 21 - 40 Devices 2,264.00$ Yes Fire / Prevention FY 23/24: 1/3 2,343.00$ 3.5% Full Cost: 2,343.24$ FY 24/25: 1/3
Fire Alarm Systems with pre-wire Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery inspection required (high rise and R-2 Fire / Prevention User Fee over 3 year period Occupancies):

Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 41 - 100 Devices 3,396.00$ Yes Fire / Prevention FY 23/24: 1/3 3,514.00$ 3.5% Full Cost: 3,514.86$ FY 24/25: 1/3
Fire Alarm Systems with pre-wire Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery inspection required (high rise and R-2 Fire / Prevention User Fee over 3 year period Occupancies):

Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 101 - 200 Devices 4,245.00$ Yes Fire / Prevention FY 23/24: 1/3 4,393.00$ 3.5% Full Cost: 4,393.58$ FY 24/25: 1/3
Fire Alarm Systems with pre-wire Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery inspection required (high rise and R-2 Fire / Prevention User Fee over 3 year period Occupancies):

Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Each additional 50 Devices 849.00$ Yes Fire / Prevention FY 23/24: 1/3 878.00$ 3.4% ( >200 devices) Full Cost: 878.72$ FY 24/25: 1/3 Fire Pump Installation 3,396.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 3,514.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 3,514.86$ FY 24/25: 1/3 High-Rise Fire Protection Water Storage 1,556.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,610.00$ 3.5% Tank (1st tank) Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,610.98$ FY 24/25: 1/3 Reference: CMD 109 9 - 10
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
High-Rise Fire Protection Water Storage 566.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 585.00$ 3.4% Tank (each additional tank) Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 585.81$ FY 24/25: 1/3 Hazardous Materials Closure Plan: Charged by: Date: 4/23/2024 Objective: Recover Cost Modified fee structure Fire / Prevention User Fee
Facility/Site - <=5,000 sq ft 1,415.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 1,464.00$ 3.5% Collected by: Full Cost: 1,464.53$
Facility/Site - 5,001 to 25,000 sq ft 2,264.00$ Yes Fire / Prevention Full Cost: 2,343.24$ 2,343.00$ 3.5% Facility/Site - >25,001 sq ft 2,830.00$ Yes Full Cost: 2,929.05$ 2,929.00$ 3.5% Backflow Preventer Replacement 1,698.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost 1,757.00$ 3.5% Fire / Prevention User Fee
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,757.43$
Hazardous Materials Closure Plan: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Equipment 2,830.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,929.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,929.05$ FY 24/25: 1/3 Hazardous Material Tool / Equipment 2,830.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,929.00$ 3.5% New Installation Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,929.05$ FY 24/25: 1/3 High-Piled Combustible Storage 2,264.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,343.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,343.24$ FY 24/25: 1/3 Reference: CMD 109 9 - 11
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Knox Box Installation 424.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 438.00$ 3.3% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 439.36$ FY 24/25: 1/3 Liquified Petroleum Gases Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Installation per Tank 1,132.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,171.00$ 3.4% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Methane Venting and Detection Systems 3,962.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 4,100.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 4,100.67$ FY 24/25: 1/3 Open Burnings 849.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 878.00$ 3.4% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 878.72$ FY 24/25: 1/3 Ovens Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Industrial Baking and / or Drying per oven 1,132.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,171.00$ 3.4% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Community Development Department 1,698.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,050.00$ 20.7% Referrals Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,050.34$ FY 24/25: 1/3 Reference: CMD 109 9 - 12
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Public Fireworks Display and Pyrotechnic 2,264.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,343.00$ 3.5% Special Effects Use Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Secondary Fireworks/Pyro Submittal - 566.00$ Yes Collected by: FY 23/24: 1/3 585.00$ 3.4% No Detailed Plan Review Required Fire / Prevention Full Cost: 2,343.24$ FY 24/25: 1/3 Full Cost: 585.81$
Pyrotechnics Special Effects Proximal 3,396.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 3,514.00$ 3.5% to Audience Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Secondary Pyro Submittal - 849.00$ Yes Collected by: FY 23/24: 1/3 878.00$ 3.4% No Detailed Plan Review Required Fire / Prevention Full Cost: 3,514.86$ FY 24/25: 1/3 Full Cost: 878.72$
Refrigeration System 1,698.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,757.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,757.43$ FY 24/25: 1/3 Access Control and Traffic Calming 1,132.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,171.00$ 3.4% Devices, Gates and Barricades across Fire User Fee over 3 year period fire apparatus access roads Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Smoke Control System 5,660.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 5,858.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 5,858.10$ FY 24/25: 1/3 Standpipe Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Wet, Combination and Horizontal 1,415.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,464.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 Reference: CMD 109 9 - 13
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Storage Tanks - Hazardous Materials: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Underground and Above Ground Tank 2,830.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,929.00$ 3.5% Installations (1st tank) Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,929.05$ FY 24/25: 1/3 Underground and Above Ground Tank 1,132.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,171.00$ 3.4% Installations (each additional tank after Fire / Prevention User Fee over 3 year period the 1st) Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Storage Tanks - Hazardous Materials: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Underground and Above Ground Tank 2,547.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,636.00$ 3.5% Removals (1st tank) Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,636.15$ FY 24/25: 1/3 Underground and Above Ground Tank 1,132.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,171.00$ 3.4% Removals (each additional tank after Fire / Prevention User Fee over 3 year period the 1st) Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Underground and Above Ground Tank 1,415.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,464.00$ 3.5% Modifications Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 First Tent, Canopy or Air 1,132.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,171.00$ 3.4% Supported Structure Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Reference: CMD 109 9 - 14
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Each Additional Tent, Canopy 424.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 438.00$ 3.3% or Air Supported Structure Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 439.36$ FY 24/25: 1/3 Special Event Structure 2,830.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,929.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,929.05$ FY 24/25: 1/3 Underground Fire Service Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Fire Sprinkler System (no hydrants) 1,981.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,050.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,050.34$ FY 24/25: 1/3 Underground Fire Service Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Fire Sprinkler System with hydrants 2,547.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,636.00$ 3.5% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,636.15$ FY 24/25: 1/3 Underground Fire Service Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Repairs and Minor Modifications 1,132.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,171.00$ 3.4% Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Automatic Fire Sprinkler Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Residential 13D - Initial Submittal Plan 1,698.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,757.00$ 3.5% Review Required Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,757.43$ FY 24/25: 1/3 Reference: CMD 109 9 - 15
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Automatic Fire Sprinkler Systems: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire / Prevention User Fee over 3 year period
Residential 13D - Secondary Submittal - 849.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 878.00$ 3.4% No Detailed Review Required Collected by: FY 23/24: 1/3 Fire / Prevention Full Cost: 878.72$ FY 24/25: 1/3 Automatic Fire Protection System for 1,556.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,610.00$ 3.5% Spray Booths Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,611.50$ FY 24/25: 1/3 On-Demand Mobile Fueling Site Permit 2,264.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,343.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,343.24$ FY 24/25: 1/3 2-Way Elevator Permit 1,698.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,757.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,757.43$ FY 24/25: 1/3 Solar Photovoltaic Power Systems - 2,264.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,343.00$ 3.5% COMMERCIAL Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,343.24$ FY 24/25: 1/3 Solar Photovoltaic Power Systems - 425.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 439.00$ 3.3% RESIDENTIAL Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 439.88$ FY 24/25: 1/3 Reference: CMD 109 9 - 16
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Phased Permitting / Occupancy Plan 3,396.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 3,514.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 3,514.86$ FY 24/25: 1/3 Access Controlled Egress 1,698.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,050.00$ 20.7% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,050.34$ FY 24/25: 1/3 Fire Safety Demolition / Construction Plan 1,981.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,050.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,050.34$ FY 24/25: 1/3 Hazardous Materials Tools / Equipment: Charged by: Date: 4/23/2024 Objective: Recover Cost Modified fee structure Fire / Prevention User Fee
Modification / Addition to Existing Tool / 1,698.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 1,757.00$ 3.5% Equipment Collected by: Full Cost: 1,757.43$
Modification to Existing Tool - Changing 1,132.00$ Yes Fire / Prevention Full Cost: 1,171.62$ 1,171.00$ 3.4% to Haz Mat and Detection - no
construction
Demolition Only 1,132.00$ Yes Full Cost: 1,171.62$ 1,171.00$ 3.4% Energy Storage Systems 2,264.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,343.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,343.00$ FY 24/25: 1/3 Energy Storage Systems - 566.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 585.00$ 3.4% RESIDENTIAL (R3) Fire / Prevention User Fee over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 585.81$ FY 24/25: 1/3 Reference: CMD 109 9 - 17
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Energy Storage Systems - Yes Charged by: Date: Objective: Recover Cost 1,171.00$ New Commercial Decommissioning Fire / Prevention User Fee
Res. No. Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,171.62$
Plant Extraction Systems 2,264.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,343.00$ 3.5% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 2,343.24$ FY 24/25: 1/3 Plan Revision Fee 566.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 585.00$ 3.4% Fire / Prevention User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 585.81$ FY 24/25: 1/3 Resubmittal Fee 1,132.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost This fee was previously 1,171.00$ 3.4% Fire / Prevention User Fee combined with the Plan
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 Revision Fee; Department is Collected by: now breaking this out
Fire / Prevention Full Cost: 1,171.62$ separately.

Carbon Dioxide Beverage Dispensing 1,415.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,464.00$ 3.5% System Fire User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 Design Review / Consultation 283.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 292.00$ 3.2% per hour Fire User Fee over 3 year period per hour
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 292.91$ FY 24/25: 1/3 Reference: CMD 109 9 - 18
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Miscellaneous Inspections or Plan 283.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 292.00$ 3.2% Reviews, per hour per hour Fire User Fee over 3 year period per hour Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 292.91$ FY 24/25: 1/3 Miscellaneous Haz Mat Inspections or Haz 283.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost 292.00$ 3.2% Mat Plan Reviews, or Haz Mat Field per hour Fire User Fee per hour Sampling, per hour Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 292.91$
Overtime Inspection (max 3 hrs) 1,018.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,053.00$ 3.4% (max 3 hours) Fire User Fee over 3 year period (max 3 hours) Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,054.46$ FY 24/25: 1/3 Overtime Haz Mat Inspection (max 3 hrs) 1,018.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost 1,053.00$ 3.4% (max 3 hours) Fire User Fee (max 3 hours)
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,054.46$
Overtime Plan Review (max 3 hrs) 1,018.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,053.00$ 3.4% (max 3 hours) Fire User Fee over 3 year period (max 3 hours) Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,054.46$ FY 24/25: 1/3 Overtime Haz Mat Plan Review 1,018.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost 1,053.00$ 3.4% (max 3 hrs) (max 3 hours) Fire User Fee (max 3 hours)
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,054.46$
Reference: CMD 109 9 - 19
Department / Division: Fire / Construction Permits / General Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Outdoor Assembly Event 1,415.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,464.00$ 3.5% Fire User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 1,464.53$ FY 24/25: 1/3 Licensed Care Facility (Pre-Inspection) 566.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 585.00$ 3.4% Fire User Fee over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire / Prevention Full Cost: 585.81$ FY 24/25: 1/3 Residential Fire-Building Plan Review - 353.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 365.00$ 3.4% (R-3/R-3.1 occupancies only) Fire User Fee
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 366.13$
Hourly Rate for Miscellaneous Services Charged by: Date: 4/23/2024 Objective: Recover Cost Adding to fee schedule Fire User Fee
Regular Hours Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 per hour 292.00$ New Collected by: Full Cost: 292.91$
Overtime Yes Fire / Prevention per hour 351.00$ New Full Cost: 351.49$
Reference: CMD 109 9 - 20
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Aerosol Products 367.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 379.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 380.78$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Additive Manufacturing 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 292.00$ 3.2% Annual Collected by: Annual
Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Amusement Park Buildings 367.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 379.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 380.78$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Covered and Open Mall Buildings 1,698.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,757.00$ 3.5% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 1,757.43$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Public Safety Emergency Information 28.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 Collected by:

Finance Full Cost:

Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Exhibit and Trade Shows 367.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 379.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 380.78$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Explosives 367.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 379.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 380.78$ FY 24/25: 1/3

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 21
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Cutting and Welding 367.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 379.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 380.78$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Cellulose Nitrate Storage 141.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 145.00$ 2.8% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 146.45$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Combustible Dust Producing Operations 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 585.81$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Combustible Fiber Storage 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 292.91$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Combustible Storage - Including tires in 212.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 219.00$ 3.3% excess of 2,500 cubic feet Annual Collected by: FY 23/24: 1/3 Annual Finance Full Cost: 219.68$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Dry Cleaning Plants 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Reference: CMD 109 9 - 22
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Energy Storage Systems 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
High-Piled Combustible Storage 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 585.81$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Hot Work Operations 141.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 145.00$ 2.8% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 146.45$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Lithium-Ion and Lithium Metal Battery 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 585.00$ 3.4% Storage Annual Collected by: Annual
Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Lumber Yard - more than 100,000 board 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% feet Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 292.91$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Magnesium Working - more than 10 lbs. 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% per work day Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 292.91$ FY 24/25: 1/3
Reference: CMD 109 9 - 23
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Miscellaneous combustible storage 141.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 145.00$ 2.8% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 146.45$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Organic Coatings 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Industrial Ovens 141.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 145.00$ 2.8% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 146.45$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Places of Assembly 212.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 219.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 219.68$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Places of Assembly (Temporary) 1,698.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,757.00$ 3.5% Collected by: FY 23/24: 1/3
Finance Full Cost: 1,757.43$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Compressed Gases 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 585.81$ FY 24/25: 1/3
Reference: CMD 109 9 - 24
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Pyroxylin Plastics 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 585.81$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Refrigeration Equipment 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 292.91$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Repair Garages 184.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 190.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 190.44$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Rooftop Heliports 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 585.81$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Smoke Control and Evacuation Systems 778.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 805.00$ 3.5% Collected by: FY 23/24: 1/3
Finance Full Cost: 805.23$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Spraying or Dipping Operations 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Reference: CMD 109 9 - 25
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Tire Rebuilding Plants 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Waste Handling Facilities 637.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 659.00$ 3.5% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 659.30$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Wood Products – Storage in excess of 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% 200 cubic feet Annual Collected by: FY 23/24: 1/3 Annual Finance Full Cost: 585.81$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Liquid-or-gas Vehicles or Equipment 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% in Assembly Buildings per hour Collected by: FY 23/24: 1/3 per hour Finance Full Cost: 292.91$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Motor Fuel Dispensing Facilities 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 292.91$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Pyrotechnics Special Effects Material 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% Storage Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 292.91$ FY 24/25: 1/3
Reference: CMD 109 9 - 26
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Plant Extraction Systems 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Indoor Growing Operations 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Emergency Responder Radio Coverage 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% System Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 585.81$ FY 24/25: 1/3
Single Story Building Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
1 to 20,000 square feet 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Single Story Building Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
20,001 square feet or greater 636.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 658.00$ 3.5% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 659.04$ FY 24/25: 1/3
Multi-Story Buildings Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
2 or more stories in height and not 849.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 878.00$ 3.4% classified as a High Rise (per floor) per floor Collected by: FY 23/24: 1/3 per floor Finance Full Cost: 878.72$ FY 24/25: 1/3
Reference: CMD 109 9 - 27
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Operational Permit Reinspection Fee 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% (per hour) Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 292.91$ FY 24/25: 1/3
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Energy Storage Systems, Serving Life 141.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 145.00$ 2.8% Safety Systems Collected by:

Finance Full Cost: 146.45$
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Mobile Fueling of Hydrogen-Fueled 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 585.00$ 3.4% Vehicles Annual Collected by: Annual
Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Hazardous Production Materials Facilities 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 585.00$ 3.4% Annual Collected by: Annual
Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Private Fire Hydrants 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 292.00$ 3.2% Annual Collected by: Annual
Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Fire Hydrants and Valves 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 292.00$ 3.2% Annual Collected by: Annual
Finance Full Cost: 292.91$
Reference: CMD 109 9 - 28
Department / Division: Fire / Operational Permits Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Temporary Membrane Structures and 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 585.00$ 3.4% Tents Annual Collected by: Annual
Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Lithium Batteries 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 585.00$ 3.4% Annual Collected by: Annual
Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Additional Permits 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 585.00$ 3.4% Annual Collected by: Annual
Finance Full Cost: 585.81$
Reference: CMD 109 9 - 29
Department / Division: Fire / Operational Permits - Haz Mat Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Flammable and Combustible Liquids 283.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 292.00$ 3.2% Materials Annual Fire User Fee over 3 year period Annual Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Finance Full Cost: 292.91$ FY 24/25: 1/3
Combustible and Flammable Materials - 1,698.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,757.00$ 3.5% On Demand Mobile Fueling Annual Fire User Fee over 3 year period Annual Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Finance Full Cost: 1,757.43$ FY 24/25: 1/3
Corrosives 367.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 379.00$ 3.3% Annual Fire User Fee over 3 year period Annual
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Finance Full Cost: 380.78$ FY 24/25: 1/3
Cryogenic Fluids 367.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 379.00$ 3.3% Annual Fire User Fee over 3 year period Annual
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Finance Full Cost: 380.78$ FY 24/25: 1/3
Highly Toxic Materials 566.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 585.00$ 3.4% Annual Fire User Fee over 3 year period Annual
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Finance Full Cost: 585.81$ FY 24/25: 1/3
Liquefied Petroleum Gas 367.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 379.00$ 3.3% Annual Fire User Fee over 3 year period Annual
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Finance Full Cost: 380.78$ FY 24/25: 1/3
Organic Peroxides: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Liquids and Solids - any amount 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Except: Class V Organic Peroxides Finance Full Cost: 439.36$ FY 24/25: 1/3

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 30
Department / Division: Fire / Operational Permits - Haz Mat Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Organic Oxidizing Materials: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Gases, Liquids and Solids 367.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 379.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 380.78$ FY 24/25: 1/3
Pyrophoric Materials: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Gases, Liquids and Solids - any amount 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Toxic Materials: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Gases, Liquids and Solids 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Unstable (Reactive) Materials: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Gases, Liquids and Solids 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Water Reactive Materials: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Gases, Liquids and Solids 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Reference: CMD 109 9 - 31
Department / Division: Fire / State Mandated Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
High Rise (per floor) 1,132.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 1,171.00$ 3.4% per floor Fire User Fee over 3 year period per floor
Annual Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Annual Collected by: FY 23/24: 1/3
Finance Full Cost: 1,171.62$ FY 24/25: 1/3
R-1/R-2 Occupancies: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
Multi-Family, 3 or more residential units 28.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 28.00$ Collected by: FY 23/24: 1/3 per unit
Finance Full Cost: 28.98$ FY 24/25: 1/3
High Rise R-1 / R-2 (per floor) 919.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 951.00$ 3.5% per floor Fire User Fee over 3 year period per floor
Annual Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Annual Collected by: FY 23/24: 1/3
Finance Full Cost: 951.94$ FY 24/25: 1/3
Commercial Day Care (E3) Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Adult Day Care (I4) Fire User Fee over 3 year period
7 - 49 persons 283.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 292.00$ 3.2% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 292.91$ FY 24/25: 1/3
Commercial Day Care (E3) Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Adult Day Care (I4) Fire User Fee over 3 year period
50 - 149 persons 424.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 438.00$ 3.3% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 439.36$ FY 24/25: 1/3
Commercial Day Care (E3) Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Adult Day Care (I4) Fire User Fee over 3 year period
150 + persons 849.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 878.00$ 3.4% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 878.72$ FY 24/25: 1/3
School Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
1 - 250 Students 566.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 585.81$ FY 24/25: 1/3

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 32
Department / Division: Fire / State Mandated Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
School Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
251 - 500 Students 1,132.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 1,171.00$ 3.4% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 1,171.62$ FY 24/25: 1/3
School Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery Fire User Fee over 3 year period
> 500 Students 2,264.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 2,343.00$ 3.5% Annual Collected by: FY 23/24: 1/3 Annual
Finance Full Cost: 2,343.24$ FY 24/25: 1/3
Jails 849.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 878.00$ 3.4% Annual Fire User Fee over 3 year period Annual
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Finance Full Cost: 878.72$ FY 24/25: 1/3
Hospitals 2,830.00$ Yes Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in full cost recovery 2,929.00$ 3.5% Annual Fire User Fee over 3 year period Annual
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Finance Full Cost: 2,929.05$ FY 24/25: 1/3
Reference: CMD 109 9 - 33
Department / Division: Fire / Penalty Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
False Alarm Responses Charged by: Date: 4/23/2024 Objective: Penalty Phasing in full cost recovery Fire over 3 year period
After third time in 180 day period 495.00$ No Res. No. 24-9316 Prop 26 Exception: 1, 2 FY 22/23: 1/3 512.00$ 3.4% per response Collected by: FY 23/24: 1/3
Fire Prevention Full Cost: 512.33$ FY 24/25: 1/3 Re-Inspection Fee (Development): Charged by: Date: 4/23/2024 Objective: Penalty Phasing in full cost recovery Fire over 3 year period
For failure to cancel appointment, work 566.00$ No Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 585.00$ 3.4% not ready for inspection or more than two Collected by: FY 23/24: 1/3 re-inspections Fire Prevention Full Cost: 585.81$ FY 24/25: 1/3 Re-Inspection Fee (CUPA Development): Charged by: Date: 4/23/2024 Objective: Penalty The re-inspection fee is now Fire being broken out by their
For failure to cancel appointment, work 566.00$ No Res. No. 24-9316 Prop 26 Exception: 5 respective programs. 585.00$ 3.4% not ready for inspection or more than two Collected by: Not a new fee. re-inspections Fire Prevention Full Cost: 585.81$
Re-Inspection Fee (Fire Operational): Charged by: Date: 4/23/2024 Objective: Penalty The re-inspection fee is now Fire being broken out by their
For failure to cancel appointment, work 566.00$ No Res. No. 24-9316 Prop 26 Exception: 5 respective programs. 585.00$ 3.4% not ready for inspection or more than two Collected by: Not a new fee. re-inspections Fire Prevention Full Cost: 585.81$
Re-Inspection Fee (CUPA Operational): Charged by: Date: 4/23/2024 Objective: Penalty The re-inspection fee is now Fire being broken out by their
For failure to cancel appointment, work 566.00$ No Res. No. 24-9316 Prop 26 Exception: 5 respective programs. 585.00$ 3.4% not ready for inspection or more than two Collected by: Not a new fee. re-inspections Fire Prevention Full Cost: 585.81$
Expired Fire Development Construction 1,132.00$ No Charged by: Date: 4/23/2024 Objective: Penalty Phasing in full cost recovery 1,171.00$ 3.4% Permit Reactivation Fee Fire over 3 year period
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire Prevention Full Cost: 1,171.62$ FY 24/25: 1/3 Expired Fire Development Construction 1,132.00$ No Charged by: Date: 4/23/2024 Objective: Penalty Phasing in full cost recovery 1,171.00$ 3.4% Permit Plan Review Reactivation Fee Fire over 3 year period Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 22/23: 1/3 Collected by: FY 23/24: 1/3
Fire Prevention Full Cost: 1,171.62$ FY 24/25: 1/3

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 34
Department / Division: Fire / Penalty Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Expired CUPA Development Construction 1,132.00$ No Charged by: Date: 4/23/2024 Objective: Penalty The expired construction 1,171.00$ 3.4% Permit Reactivation Fee Fire permit reactivation fee is now Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 being broken out by their Collected by: respective programs.

Fire Prevention Full Cost: 1,171.62$ Not a new fee.

Expired CUPA Development Construction 1,132.00$ No Charged by: Date: 4/23/2024 Objective: Penalty The expired construction 1,171.00$ 3.4% Permit Plan Review Reactivation Fee Fire permit reactivation fee is now Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 being broken out by their Collected by: respective programs.

Fire Prevention Full Cost: 1,171.62$ Not a new fee.

Administrative Citations Penalty as Assessed No Charged by: Date: 4/18/2023 Objective: Penalty Unchanged - Refer to per CSC Municipal Code Fire Current Fee
Res. No. 23-9221 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Late filing of documents / reports / 100.00$ No Charged by: Date: 4/18/2023 Objective: Penalty 103.00$ 3.0% information - per occurrence per occurrence Fire per occurrence Res. No. 23-9221 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Late filing of CUPA documents / reports / 500.00$ No Charged by: Date: 4/23/2024 Objective: Penalty 517.00$ 3.4% information - per occurrence per occurrence Fire per occurrence Res. No. 24-9316 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Late Payment of Fire Operational Permit 50% of Assessed Fee No Charged by: Date: 4/18/2023 Objective: Penalty Linked to California Fire Code Unchanged - Refer to Fee - >30 days Not to Exceed $500 Fire Section 105.5 Current Fee Res. No. 23-9221 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Reference: CMD 109 9 - 35
Department / Division: Fire / Penalty Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Late Payment of CUPA Permit Fee 50% of Assessed Fee No Charged by: Date: 9/19/2023 Objective: Penalty Unchanged - Refer to - >30 days Not to Exceed $500 Fire Current Fee
Res. No. 23-9267 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Reference: CMD 109 9 - 36
Department / Division: Fire / Document Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Laseriche / Microfilm Copies Actual Cost No Charged by: Date: 4/23/2024 Objective: Recover Cost Records request recover Unchanged - Refer to Fire less than full cost Current Fee
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Fire Full Cost: 73.23$
Photographs Actual Cost No Charged by: Date: 4/23/2024 Objective: Recover Cost Records request recover Unchanged - Refer to Fire less than full cost Current Fee
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Fire Full Cost: 73.23$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 37
Department / Division: Fire / CUPA Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Hazardous Waste Generator Fees: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
Less than 100 Kg per year 473.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 512.00$ 8.2% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 512.58$ FY 25/26: 1/4
Hazardous Waste Generator Fees: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
100 kg to 999 kg 686.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 878.00$ 28.0% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 878.72$ FY 25/26: 1/4
Hazardous Waste Generator Fees: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
1,000 Kg to 4.99 Tons 897.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 1,171.00$ 30.5% Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 1,171.62$ FY 25/26: 1/4
Hazardous Waste Generator Fees: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
5 tons to less than 25 tons per year 1,270.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 1,464.00$ 15.3% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 1,464.53$ FY 25/26: 1/4
Hazardous Waste Generator Fees: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
25 tons and greater 1,468.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 1,757.00$ 19.7% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 1,757.43$ FY 25/26: 1/4
California Accidental Release Program Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:
(CALARP) Fees: Fire User Fee FY 22/23: 1/4
FY 23/24: 1/4
CalARP Facility Operating Permit Program 1 2,585.00$ Yes Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 2,929.00$ 13.3% Annual Finance FY 25/26: 1/4 Annual
Full Cost: 2,929.05$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 38
Department / Division: Fire / CUPA Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
California Accidental Release Program Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:
(CALARP) Fees: Fire User Fee FY 22/23: 1/4
FY 23/24: 1/4
CalARP Facility Operating Permit Program 2 3,102.00$ Yes Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 3,514.00$ 13.3% Annual Finance FY 25/26: 1/4 Annual
Full Cost: 3,514.86$
California Accidental Release Program Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:
(CALARP) Fees: Fire User Fee FY 22/23: 1/4
FY 23/24: 1/4
CalARP Facility Operating Permit Program 3 3,102.00$ Yes Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 3,514.00$ 13.3% Annual Finance FY 25/26: 1/4 Annual
Full Cost: 3,514.86$
California Accidental Release Program Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:
(CALARP) Fees: Fire User Fee FY 22/23: 1/4
FY 23/24: 1/4
RMP Review Fee per hour 283.00$ Yes Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 292.00$ 3.2% per hour Finance FY 25/26: 1/4 per hour
Full Cost: 3,514.86$
Onsite treatment of Hazardous Waste Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Annual Fee - Highest Tier: Fire User Fee FY 22/23: 1/4
FY 23/24: 1/4
Permit by Rule 2,029.00$ Yes Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 2,343.00$ 15.5% Annual Finance FY 25/26: 1/4 Annual
Full Cost: 2,343.24$
Onsite treatment of Hazardous Waste Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Annual Fee - Highest Tier: Fire User Fee FY 22/23: 1/4
FY 23/24: 1/4
Conditionally Authorized 1,299.00$ Yes Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 1,464.00$ 12.7% Annual Finance FY 25/26: 1/4 Annual
Full Cost: 1,464.53$
Onsite treatment of Hazardous Waste Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Annual Fee - Highest Tier: Fire User Fee FY 22/23: 1/4
FY 23/24: 1/4
Conditionally Exempt 517.00$ Yes Collected by: Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 585.00$ 13.2% Annual Finance FY 25/26: 1/4 Annual
Full Cost: 585.81$
Reference: CMD 109 9 - 39
Department / Division: Fire / CUPA Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
State of California Annual Surcharges: Charged by: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.

CUPA Oversight Fee As Determined by No Res. No. 09-7653 Prop 26 Exception: 1, 2, 3 Unchanged - Refer to State Regulation Collected by: Current Fee
Finance Full Cost: N/A
State of California Annual Surcharges: Charged by: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.

Underground Tank Fee As Determined by No Res. No. 09-7653 Prop 26 Exception: 1, 2, 3 Unchanged - Refer to State Regulation Collected by: Current Fee
Finance Full Cost: N/A
State of California Annual Surcharges: Charged by: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.

California Accidental Release Prevention As Determined by No Res. No. 09-7653 Prop 26 Exception: 1, 2, 3 Unchanged - Refer to Program State Regulation Collected by: Current Fee
Finance Full Cost: N/A
State of California Annual Surcharges: Charged by: Date: 4/21/2015 Objective: User Fee Set by State Collected by Fire City and paid to State.

Aboveground Petroleum Storage Act As Determined by No Res. No. 15-8226 Prop 26 Exception: 1, 2, 3 Unchanged - Refer to State Regulation Collected by: Current Fee
Finance Full Cost: N/A
Aboveground Petroleum Storage Tank Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Program: Fire User Fee FY 22/23: 1/4
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 < 1,320 gallon capacity 642.00$ Yes Collected by: FY 24/25: 1/4 732.00$ 14.0% Annual Finance Full Cost: 732.26$ FY 25/26: 1/4 Annual Aboveground Petroleum Storage Tank Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Program: Fire User Fee FY 22/23: 1/4
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 1,320 - 10,000 gallon capacity 982.00$ Yes Collected by: FY 24/25: 1/4 1,025.00$ 4.4% Annual Finance Full Cost: 1,025.17$ FY 25/26: 1/4 Annual Reference: CMD 109 9 - 40
Department / Division: Fire / CUPA Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Aboveground Petroleum Storage Tank Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Program: Fire User Fee FY 22/23: 1/4
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 More than 10,000 gallon capacity 1,249.00$ Yes Collected by: FY 24/25: 1/4 2,050.00$ 64.1% Annual Finance Full Cost: 2,050.34$ FY 25/26: 1/4 Annual Aboveground Petroleum Storage Tank Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Program: Fire User Fee FY 22/23: 1/4
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Tank in Underground Area (TIUGA) 529.00$ Yes Collected by: FY 24/25: 1/4 585.00$ 10.6% Annual Finance Full Cost: 585.81$ FY 25/26: 1/4 Annual Underground Hazardous Materials Tank: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
First Tank 1,848.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 2,123.00$ 14.9% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 2,123.56$ FY 25/26: 1/4
Underground Hazardous Materials Tank: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
Each Additional Tank 534.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 585.00$ 9.6% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 585.81$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
1 - 3 Chemicals 727.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 878.00$ 20.8% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 878.72$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
4 - 6 Chemicals 998.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 1,171.00$ 17.3% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 1,171.62$ FY 25/26: 1/4
Reference: CMD 109 9 - 41
Department / Division: Fire / CUPA Fees Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Hazardous Materials Business Plan: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
7 - 9 Chemicals 1,497.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 1,757.00$ 17.4% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 1,757.43$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
10 - 15 Chemicals 2,003.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 2,343.00$ 17.0% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 2,343.24$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
16 - 21 Chemicals 2,518.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 2,929.00$ 16.3% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 2,929.05$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/23/2024 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
Each additional chemical > 21 65.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 73.00$ 12.3% Annual Collected by: FY 24/25: 1/4 Annual
Finance Full Cost: 73.23$ FY 25/26: 1/4
Field Sample - Environmental Laboratory Actual Cost No Charged by: Date: 4/23/2024 Objective: Recover Cost Unchanged - Refer to Analysis Fire User Fee Current Fee
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3
Collected by:

Fire Prevention Full Cost:

Miscellaneous CUPA Inspection, CUPA 283.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost 292.00$ 3.2% Plan Reviews, CUPA Field Sampling, or per hour Fire User Fee per hour CUPA Investigation, per hour Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 Collected by:

Fire Prevention Full Cost: 292.91$
Reference: CMD 109 9 - 42
Department / Division: Fire / Emergency Medical Services Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Ambulance Transport Fees As determined by No Charged by: Date: 4/23/2024 Objective: Recover Cost Ambulance Transport Fees Unchanged - Refer to the County of Santa Fire align with the Santa Clara Current Fee Clara Res. No. 24-9316 Prop 26 Exception: 2 County EMS Agency Fee Collected by: Schedule
Fire Full Cost: N/A

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 43

Department / Division: Library Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Replacement for library materials Current costs of item No Charged by: Date: 4/18/2017 Objective: Recover Cost Processing fee incurred to Unchanged - Refer to + processing fee Library Prop 26 Exception: 1, 2 recover the cost of Current Fee Res. No. replacing library materials.

5.00$ Collected by: Full Cost: 5.00$ Unchanged - Refer to Library plus materials Current Fee
Replacement fee for lost or damaged 2.00$ No Charged by: Date: 4/22/2014 Objective: Recover Cost Cost recovery for replacing Unchanged - Refer to library card Library a lost or damaged library card; Current Fee Res. No. Prop 26 Exception: 1, 2 1st replacement at no charge.

Collected by:

Library Full Cost:

Replacement Fees for Portable No Charged by: Date: 4/23/2024 Objective: Recover Cost Electronic Devices Library
Res. No. 24-9316 Prop 26 Exception: 1, 2
Chromebooks Replacement Fee 265.00$ Collected by: Unchanged - Refer to Library Full Cost: N/A Current Fee
Mobile Hotspot Replacement 60.00$ Unchanged - Refer to Fee Current Fee
Fitbit Zip Replacement Fee 59.95$ Fee is no longer applicable.

Lost Sleeve 20.00$
Lost Clear Case Box 2.00$
Fee for borrowing materials from other 10.00$ No Charged by: Date: 5/8/2018 Objective: Recover Cost Unchanged - Refer to libraries (interlibrary loan) per item Library Current Fee Res. No. Prop 26 Exception: 1, 2
Collected by:

Library Full Cost: -$
Replacement fee for lost Link+ materials 115.00$ No Charged by: Date: 6/10/2003 Objective: Recover Cost Replacement fee is collected by Unchanged - Refer to borrowed from other libraries Library the library and transferred to Current Fee Res. No. Prop 26 Exception: 1, 2 the owning library; fee amount Collected by: is determined by Link+
Library Full Cost: -$ consortium.

Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 10 - 1
Department / Division: Library Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Collection Agency Fee Library Asset 16.00$ No Charged by: Date: 4/19/2022 Objective: Recover Cost Fee is assessed to recover Unchanged - Refer to Recovery Library the cost charged by Current Fee
Res. No. 22-9081 Prop 26 Exception: 1, 2 collection agency to the library Collected by: for resolving delinquent
Library Full Cost: -$ accounts.

Fee for using library meeting room Charged by: Date: 6/21/2022 Objective: User Fee Library
Residents / Non-Profits 20.00$ No Res. No. 22-9112 Prop 26 Exception: 4 Unchanged - Refer to per meeting Collected by: Current Fee
Library Full Cost: N/A
Non-Residents 90.00$ No Unchanged - Refer to per hour Current Fee
Additional assistance required 30.00$ No Unchanged - Refer to per hour Current Fee
Cleaning Fee (As Required) No To be collected from renters 50.00$ New when custodial work is
required subsequent to the
rental to address spills,
carpet stain removal, etc.

Amount will only be
collected if needed.

Reference: CMD 109 10 - 2

Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
SITE PREPARATION Charged by: Date 4/23/2024 Objective: Recover Cost Cemetery
Casket Burial, Install Single Burial Vault, 3,946.00$ No Res. No. 24-9316 Prop 26 Exception: N/A 4,084.00$ 3.5% Single Depth Grave Collected by:

Cemetery & Full Cost: 4,084.69$
Finance
Casket Burial, Install Single Burial Vault, 4,004.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 4,144.00$ 3.5% Double Depth Grave Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 4,144.78$
Finance
Casket Burial, Install Companion Vault, 4,804.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 4,972.00$ 3.5% Double Depth Grave Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 4,973.09$
Finance
Casket Burial, Pre-Installed Companion 3,659.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Vault, Double Depth Grave Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost:

Finance
Casket Burial, Install One Small Burial Vau 298.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 308.00$ 3.4% (infants/babies), Single Depth Grave Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 3,374.72$
Finance

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 1
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Casket - One casket Burial in a grave, 3,888.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost with existing cremation(s) Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost:

Finance
Cremation - One cremation burial in a 1,601.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 1,657.00$ 3.5% Grave Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 1,657.70$
Finance
Cremation - One Cremation placement in a 1,257.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 1,300.00$ 3.4% Niche Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 1,301.48$
Finance
Casket - One casket placement in a Crypt 2,517.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 2,605.00$ 3.5% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,605.11$
Finance
Disinterment - One Casket from a Grave 4,804.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 4,972.00$ 3.5% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 4,973.09$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 2
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Disinterment - One Casket from a Crypt 2,286.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 2,366.00$ 3.5% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,366.91$
Finance
Disinterment of One Cremation from a 1,143.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 1,183.00$ 3.5% Grave Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 1,183.46$
Finance
Disinterment of One Cremation from a 628.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 649.00$ 3.3% Niche Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 650.21$
Finance
Disinter and reinter casket into same grave 5,794.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 5,996.00$ 3.5% to make Grave extra depth (Vault not Cemetery
included) Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,997.75$
Finance
First Year Maintenance Fee 456.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 471.00$ 3.3% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 472.09$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 3
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
MARKER INSTALLATION Charged by: Date Objective: Recover Cost Cemetery
Installation of a monobar, emblem, flower Actual Cost No Res. No. Prop 26 Exception: N/A Service performed by outside Unchanged - Refer to vase, or ring on a crypt (each) Collected by: agency; charge is market rate Current Fee Cemetery & Full Cost: Actual Cost
Finance
Installation of a flower vase and ring on a Actual Cost No Charged by: Date Objective: Recover Cost Service performed by outside Unchanged - Refer to niche (each) Cemetery agency; charge is market rate Current Fee Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Inscribe shutters or grave markers Actual Cost No Charged by: Date Objective: Recover Cost Service performed by outside Unchanged - Refer to (per letter charge) Cemetery agency; charge is market rate Current Fee Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Installation of a niche plaque (each) Actual Cost No Charged by: Date Objective: Recover Cost Service performed by outside Unchanged - Refer to Cemetery agency; charge is market rate Current Fee
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Installation of grave marker in South 307.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 317.00$ 3.3% Babyland, Babyland, Children's Garden Cemetery
and Oak Grove Infant Res. No. 24-9316 Prop 26 Exception: N/A Collected by:

Cemetery & Full Cost: 697.84$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 4
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Flat marker (10"x18" or 12"x24") set into 235.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 243.00$ 3.4% earth Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 243.56$
Finance
Flat marker (20"x28") set into earth 293.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 303.00$ 3.4% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 303.64$
Finance
Flat marker (10"x18" or 12"x24") set into 708.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 732.00$ 3.4% concrete frame, with or w/o vase cups Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 732.82$
Finance
Single (34" x 12") or Double (46" x 12") 456.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 471.00$ 3.3% Upright Monument Foundation Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 472.09$
Finance
Remove and dispose of marker, marker 228.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 235.00$ 3.1% frame, plaque, vase and ring upon request Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 236.05$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 5
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
PROFESSIONAL SERVICES Charged by: Date Objective: Recover Cost Cemetery
Vault Disposal - Casket 456.00$ No Res. No. Prop 26 Exception: N/A 471.00$ 3.3% Collected by:

Cemetery & Full Cost: 472.09$
Finance
Vault Disposal - Cremation 75.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 77.00$ 2.7% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 78.33$
Finance
Sanitize Crypt 1,601.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 1,657.00$ 3.5% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 1,657.70$
Finance
City to repurchase interment rights
221.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost:

Finance
Burial Permit Filing Fee 446.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 461.00$ 3.4% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 462.44$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 6
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Dig single depth grave to double depth 685.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost (Grave, casket) Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost:

Finance
Hourly Rate (Personnel) 228.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 235.00$ 3.1% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 236.05$
Finance
Custom Hourly Rate Actual Cost No Charged by: Date Objective: Recover Cost Unchanged - Refer to Cemetery Current Fee
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Saturday Service - Casket (Hourly Rate) Actual Cost No Charged by: Date Objective: Recover Cost Unchanged - Refer to Cemetery Current Fee
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Saturday Service - Cremation (Hourly Rate Actual Cost No Charged by: Date Objective: Recover Cost Unchanged - Refer to Cemetery Current Fee
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 7
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Chapel Rental - Two Hours of Use Charged by: Date 4/23/2024 Objective: Recover Cost Chapel is available Cemetery Monday - Friday
Non-Resident 361.00$ No Res. No. 24-9316 Prop 26 Exception: N/A 373.00$ 3.3% Collected by:

Resident No Charge No Cemetery & Full Cost: 374.45$ Unchanged - Refer to Finance Current Fee
PERPETUAL CARE (ENDOWMENT) Charged by: Date 4/23/2024 Objective: Recover Cost Cemetery
Casket - Two Caskets Below Ground 5,675.00$ No Res. No. 24-9316 Prop 26 Exception: N/A 5,873.00$ 3.5% Burial Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Casket - Two Caskets Above Ground 5,675.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 5,873.00$ 3.5% Burial Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Casket - One Casket Below Ground 2,835.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 2,934.00$ 3.5% Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,934.49$
Finance
Cremation - Two Cremations Below 5,675.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 5,873.00$ 3.5% Ground Burial Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 8
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Cremation - One Cremation Below 2,838.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 2,937.00$ 3.5% Ground Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,937.71$
Finance
Cremation - Two Cremations Above 5,675.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 5,873.00$ 3.5% Ground Burial Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Casket - One Casket - Babyland, South 357.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 369.00$ 3.4% Babyland, Children's Garden Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Cremation - Two Cremations Above 5,675.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 5,873.00$ 3.5% Ground Bank of Memories Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Casket - One Casket - Above Ground 5,675.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 5,873.00$ 3.5% Indoor Mausoleum Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 9
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Cremation - Four Cremations Above 11,352.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 11,749.00$ 3.5% Ground Indoor Mausoleum Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 11,749.80$
Finance
Cremation - One Cremation Above Ground 2,838.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 2,937.00$ 3.5% Indoor Community Mausoleum Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,937.71$
Finance
Casket - One Casket Above Ground 5,675.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 5,873.00$ 3.5% Garden Mausoleum Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Casket - Two One Caskets Above Ground 11,352.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 11,749.00$ 3.5% Garden Mausoleum Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 11,749.80$
Finance
Cremation - Two Cremations Above 5,675.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 5,873.00$ 3.5% Ground Garden Mausoleum Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 10
Department / Division: Parks & Recreation / Cemetery Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Cremation - Four Cremations Below 11,352.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 11,749.00$ 3.5% Ground Oak Grove Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 11,749.80$
Finance
Casket - One Casket - Below Ground 717.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 742.00$ 3.5% Oak Grove Infant Cemetery
Res. No. 24-9316 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
BURIAL MATERIALS Charged by: Date 4/23/2024 Objective: Recover Cost Cemetery
Burial Materials Processing Fee 147.00$ No Res. No. 24-9316 Prop 26 Exception: N/A 152.00$ 3.4% All materials are priced at actual cost Collected by:

Cemetery & Full Cost: 152.36$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 11
FY 2024/25
Resident Rate
FY 2025/26
Resident Rate
Change
%
FY 2024/25
Non-Resident Rate
FY 2025/26
Non-Resident Rate
Change
%
Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier A $28,116 $29,101 3.50% $33,078 $34,236 3.50% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier B or C $30,546 $31,615 3.50% $35,937 $37,195 3.50% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier D $26,067 $26,980 3.50% $30,667 $31,741 3.50% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier E $23,628 $24,455 3.50% $27,798 $28,771 3.50% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier A $32,332 $33,464 3.50% $38,038 $39,369 3.50% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier B-C $34,831 $36,050 3.50% $40,977 $42,412 3.50% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier D $29,977 $31,026 3.50% $35,266 $36,501 3.50% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier E $27,171 $28,122 3.50% $31,966 $33,085 3.50% Casket Crypts Right to inter two decedents, Garden Mausoleum, All tiers $45,366 $46,954 3.50% $53,372 $55,240 3.50% Casket Crypts Right to inter two decedents, Indoor Mausoleum, All tiers $62,078 $64,250 3.50% $73,032 $75,588 3.50% Casket Grave Right to inter one decedent, Oak Grove Infant $664 $687 3.50% $781 $808 3.50% Casket Grave Right to inter one decedent, flat marker section* $4,905 $5,077 3.50% $5,771 $5,973 3.50% Casket Grave Right to inter one decedent, upright monument section** $7,602 $7,868 3.50% $8,943 $9,256 3.50% Casket Grave Right to inter two decedents, flat marker section* $6,889 $7,130 3.50% $8,105 $8,389 3.50% Casket Grave Right to inter two decedents, upright monument section** $10,019 $10,370 3.50% $11,788 $12,200 3.50% Casket/Cremation Grave Right to inter one decedent, Babyland, South Babyland and Children's Garden
$332 $344 3.50% $391 $404 3.50%
Cremation Grave Right to inter four cremations in a grave, upright monument section** $10,574 $10,944 3.50% $12,440 $12,875 3.50% Cremation Grave Right to inter three cremations in a grave, upright monument section** $6,610 $6,842 3.50% $7,777 $8,049 3.50% Cremation Grave Right to inter two cremations in a grave, upright monument section** $5,287 $5,472 3.50% $6,220 $6,438 3.50% Cremation Grave Right to inter one cremation in a grave with a casket $2,202 $2,279 3.50% $2,591 $2,681 3.50% Cremation Grave Right to inter two cremations in a grave, Willow Bend Way and Sunrise Gardens
$4,591 $4,752 3.50% $5,401 $5,590 3.50%
Cremation Niche Right to inter two cremations in Bank of Memories, Tiers M-T $1,207 $1,249 3.50% $1,420 $1,470 3.50% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers I-L $1,450 $1,500 3.50% $1,705 $1,765 3.50% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers E-H $1,700 $1,759 3.50% $2,000 $2,070 3.50% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers A-D $1,450 $1,500 3.50% $1,705 $1,765 3.50% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 1-2 $10,623 $10,994 3.50% $12,497 $12,934 3.50% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 3-5 $10,623 $10,994 3.50% $12,497 $12,934 3.50% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 6-8 $10,623 $10,994 3.50% $12,497 $12,934 3.50% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 9-10 $10,623 $10,994 3.50% $12,497 $12,934 3.50% Cremation Niche Right to inter one cremation in Indoor Community Mausoleum $2,766 $2,863 3.50% $3,254 $3,368 3.50% Cremation Niche Right to inter two cremations in Garden Court or Sunset Garden Niche Bank, Tiers E-F
$4,343 $4,495 3.50% $5,109 $5,288 3.50%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tier D
$3,865 $4,000 3.50% $4,547 $4,706 3.50%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tier C
$3,376 $3,494 3.50% $3,972 $4,111 3.50%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tiers A-B
$2,797 $2,895 3.50% $3,291 $3,406 3.50%
Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier A - D $4,169 $4,315 3.50% $4,905 $5,077 3.50% Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier E - H $3,709 $3,839 3.50% $4,364 $4,516 3.50% Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier I - J $3,241 $3,354 3.50% $3,813 $3,946 3.50% Interment Rights
Mission City Memorial Park Interment Rights and Burial Materials Fee Schedule ** Azalea Lawn, Begonia Lawn, Camellia Lawn, Greek Annex, Greek Plot, Oak Grove, Valley Oak, Cypress Lawn, Sections D, E, F, EE, G, H, J, K, P, and T, All corridors and family blocks. * Acacia Lawn, Hillside Lawn, Palm Lawn, Palm Hill, Redwood Grove, Section L, Section S, Serenity Lawn, Willow Bend Way, Evergreen. 11 - 12
Mission City Memorial Park Interment Rights and Burial Materials Fee Schedule Burial Materials FY 2024/25
Resident Rate
FY 2025/26
Resident Rate
Change
%
FY 2024/25
Non-Resident Rate
FY 2025/26
Non-Resident Rate
Change
%
Casket Crypt Casket tray and absorbant pad Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Crypt Monbar/unibar Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Crypt Shutter replacement, crypt Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, companion casket vault (G3086-5) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra long, single casket vault G3690-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra small casket vault, child (V1637-1) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra wide, single casket vault (G4490-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, single casket vault (G3086-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, small casket vault, infant (U711) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Grave Outer Burial Container, double cremation vault (U711) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Grave Outer Burial Container, single cremation vault Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Bank of Memories (5660 TC and BC) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Bank of Memories (5660 TCB) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Garden mausoleum Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Shutter replacement, niche Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket/Cremation Niche/Crypt Bronze Flower Vase Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket/Cremation Niche/Crypt Plastic Flower Vase and Bronze Vase Ring Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Emblem (custom under 8") Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Emblem (stand alone) Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
11 - 13
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Recreation Center Auditorium / Senior Charged by: Date 4/19/2022 Objective: Recover Cost Center (Senior Center available only for Parks & Rec.

Senior - based programs): Res. No. 22-9081 & Prop 26 Exception: 4 Collected by: 22-9082 Full Cost: Varies
Auditorium w/o Kitchen: Non-Profit Meeting 20.00$ No Parks & Rec. 1% - 20% Cost Recovery Full cost includes kitchen. Unchanged - Refer to per meeting Hourly Staff costs may be Current Fee
charged for bookings, in
Auditorium w/ Kitchen: Non-Profit Event 20.00$ No 1% - 20% Cost Recovery addition to the room rental fee. Unchanged - Refer to per hour Current Fee
Staffing needs determined by
Auditorium w/ Kitchen: Resident Event 200.00$ No Market Rate Parks & Recreation staff 207.00$ 3.5% per hour based on hours of use, per hour
estimated attendance and
Auditorium w/o Kitchen: 300.00$ No 100% Cost Recovery scope of event. 310.00$ 3.3% Commercial / Non-Resident Event per hour per hour
Community Recreation Center: Charged by: Date 4/19/2022 Objective: Recover Cost Hourly Staff costs may be Meeting Rooms Parks & Rec. charged to in addition to the Res. No. 22-9081 & Prop 26 Exception: 4 room(s) fee. Staffing needs Non-Profit Meeting 20.00$ No Collected by: 22-9082 determined by Parks & Unchanged - Refer to per meeting Parks & Rec. Full Cost: Varies Recreation staff based on Current Fee hours of use, estimated
1 % - 20% Cost Recovery attendance and scope of event.

Park Building Room Rentals (60 ppl or less) Charged by: Date 4/19/2022 Objective: Recover Cost Lick Mill, Machado, Maywood, Parks & Rec.

Westwood Oaks, Lawrence Station Res. No. 22-9081 & Prop 26 Exception: 4 Community Rooms B,C Collected by: 22-9082 Full Cost: Varies Parks & Rec.

Non-Profit Meeting 20.00$ No 1% - 20% Cost Recovery Hourly Staff costs may be Unchanged - Refer to per meeting charged in addition to the Current Fee
room(s) fee.

Non-Profit Event 20.00$ No 1% - 20% Cost Recovery Unchanged - Refer to per hour Staffing needs determined by Current Fee
Parks & Recreation staff
Resident Event 60.00$ No Market Rate based on hours of use, 62.00$ 3.3% per hour estimated attendance and per hour
scope of event.

Commercial / Non-Resident Event 90.00$ No Market Rate 93.00$ 3.3% per hour per hour

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 12 - 1
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Park Building Room Rentals (60 - 120 ppl) Charged by: Date 4/23/2024 Objective: Recover Cost Montague, Lawrence Station Community Parks & Rec.

Room A (Large Room w/ Kitchen, WIFI) Res. No. 24-9316 Prop 26 Exception: 4 Collected by: Full Cost: Varies
Parks & Rec.

Non-Profit Meeting 20.00$ No 1% - 20% Cost Recovery Hourly Staff costs may be Unchanged - Refer to per meeting charged in addition to the Current Fee
room(s) fee.

Non-Profit Event 20.00$ No 1% - 20% Cost Recovery Unchanged - Refer to per hour Staffing needs determined by Current Fee
Parks & Recreation staff
Resident Event 200.00$ No Market Rate based on hours of use, 207.00$ 3.5% per hour estimated attendance and per hour
scope of event.

Commercial / Non-Resident Event 300.00$ No Market Rate 310.00$ 3.3% per hour per hour
Central Park Picnic Areas Flat rate per section, Charged by: Date 4/19/2022 Objective: Recover Cost Hourly Staff costs may be Flat rate per section, per day Parks & Rec. Prop 26 Exception: 4 charged to in addition to the per day Res. No. 22-9081 & Full Cost: Varies facility(s) fee. Staffing needs Non-Profit Event 40.00$ No Collected by: 22-9082 1% - 20% Cost Recovery determined by Parks & 41.00$ 2.5% per day Parks & Rec. Recreation staff based on per day
hours of use, estimated
Resident Event 200.00$ No Market Rate attendance and scope of event. 207.00$ 3.5% per day per day
Commercial / Non-Resident Event 600.00$ No Market Rate 621.00$ 3.5% per day per day
Electricity Activation and Use Fee 20.00$ No Unchanged - Refer to (per permit) per permit Current Fee
City Plaza Park Gazebo Cost per Day Charged by: Date 4/19/2022 Objective: Recover Cost Hourly Staff costs may be Cost per Day Parks & Rec. Prop 26 Exception: 4 charged to in addition to the Non-Profit Event, 40.00$ No Res. No. 22-9081 & Full Cost: Varies facility(s) fee. Staffing needs 41.00$ 2.5% Event open to the public per day Collected by: 22-9082 1% - 20% Cost Recovery determined by Parks & per day Parks & Rec. Recreation staff based on
Resident Event 200.00$ No Market Rate hours of use, estimated 207.00$ 3.5% per day attendance and scope of event. per day
Commercial / Non-Resident Event 600.00$ No Market Rate 621.00$ 3.5% per day per day
Reference: CMD 109 12 - 2
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Hourly Staff (as-needed) Charged by: Date 4/23/2024 Objective: Recover Cost Staffing needs determined by Assigned to facility 37.00$ No Parks & Rec. Parks & Recreation staff based 38.00$ 2.7% per person, per hour Res. No. 24-9316 Prop 26 Exception: 4 on hours of use, estimated per person, per hour Collected by: attendance and scope of event.

Equipment Rentals (as-needed) Parks & Rec. Full Cost: $ rate x hours Tables (each) 11.00$ No Unchanged - Refer to each Current Fee
Chairs (each) 2.00$ No Unchanged - Refer to each Current Fee
EZ-Up Canopy (each) 50.00$ No 51.00$ 2.0% each each
Podium 50.00$ No 51.00$ 2.0% each each
Portable Sound System 100.00$ No 103.00$ 3.0% each each
Senior Citizens Center: Rooms Charged by: Date 4/19/2022 Objective: Recover Cost Hourly Staff costs may be Parks & Rec. Prop 26 Exception: 4 charged in addition to the room Res. No. 22-9081 & Full Cost: Varies rental fee. Staffing needs Non-Profit Meeting 20.00$ No Collected by: 22-9082 1% - 20% Cost Recovery determined by Parks & Unchanged - Refer to per meeting Parks & Rec. Recreation staff based on Current Fee hours of use, estimated
Non-Profit Event 20.00$ No 1% - 20% Cost Recovery attendance and scope of event. Unchanged - Refer to per hour Current Fee
Resident Event 60.00$ No Market Rate 62.00$ 3.3% per hour per hour
Commercial / Non-Resident Event 90.00$ No Market Rate 93.00$ 3.3% per hour per hour
Reference: CMD 109 12 - 3
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Youth Activity Center: Gymnasium Cost per hour Charged by: Date 4/19/2022 Objective: Recover Cost In addition to City Facility rental Cost per hour Parks & Rec. Prop 26 Exception: 4 fees, Santa Clara Unifed Non-Profit Rental / Court 20.00$ No Res. No. 22-9081 & Full Cost: Varies School District Use of Facilities Unchanged - Refer to Current Fee
Collected by: 22-9082 1% - 20% Cost Recovery Fees (Custodial Fee) may be Resident Rental / Court 200.00$ No Parks & Rec. Market Rate applicable. 207.00$ 3.5% City hourly staff costs may be
Commercial / Non-Resident Rental / Court 300.00$ No Market Rate charged to in addition to the 310.00$ 3.3% facility fee. Staffing needs
determined by Parks &
Recreation staff based on
hours of use, estimated
attendance and scope of event.

All fees will be collected by City.

Youth Activity Center: Activity Rooms Cost per hour Charged by: Date 4/19/2022 Objective: Recover Cost In addition to City Facility rental Cost per hour Parks & Rec. Prop 26 Exception: 4 fees, Santa Clara Unifed Non-profit meeting 20.00$ No Res. No. 22-9081 & Full Cost: Varies School District Use of Facilities Unchanged - Refer to per meeting Collected by: 22-9082 1% - 20% Cost Recovery Fees (Custodial Fee) may be Current Fee Parks & Rec. applicable.

Non-profit event 20.00$ No 1% - 20% Cost Recovery City hourly staff costs may be Unchanged - Refer to per hour charged to in addition to the Current Fee
facility fee. Staffing needs
Resident event 60.00$ No Market Rate determined by Parks & 62.00$ 3.3% per hour Recreation staff based on per hour
hours of use, estimated
Commercial / Non-Resident event 90.00$ No Market Rate attendance and scope of event. 93.00$ 3.3% per hour All fees will be collected by City. per hour
Field and Turf Areas Reservations: Cost per hour Charged by: Date 4/19/2022 Objective: Recover Cost Hourly city staff costs may be Cost per hour Practice and Games Parks & Rec. Prop 26 Exception: 4 charged in addition to the field Res. No. 22-9081 & Full Cost: Varies rental fee. Staffing needs Non-Profit 14.00$ No Collected by: 22-9082 1% - 20% Cost Recovery determined by Parks & Unchanged - Refer to Current Fee
Parks & Rec. Recreation staff based on
Resident 100.00$ No Market Rate hours of use, estimated Unchanged - Refer to Current Fee
attendance and scope of event.

Commercial / Non-Resident 280.00$ No Market Rate Unchanged - Refer to Current Fee
Reference: CMD 109 12 - 4
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Racquet Court Standard Walk-On or Charged by: Date 4/18/2023 Objective: Recover Cost Vendor requested adjustments Reservation Fee Parks & Rec.

Racquet court reservations are by 12.00$ No Res. No. 23-9221 Prop 26 Exception: 4 Per hour rate / resident; prime- Unchanged - Refer to agreement with vendor per hour (resident) Collected by: time reserved. Current Fee Parks & Rec. Full Cost: Varies

14.00$ No Per hour rate / non-resident; Unchanged - Refer to per hour (non-resident) prime-time reserved. Current Fee

7.00$ No Per hour rate / resident; non 7.00$ (resident) prime-time reserved. (resident)

10.00$ No Per hour rate / non-resident; 10.00$ per hour (non-resident) non-prime-time reserved. per hour (non-resident) Fees are based on market rate.

Detailed in Qtrly Activity Guide
Recreation Cancellation Fee Flat Fee Charged by: Date 4/23/2024 Objective: Recover Cost Cancellation must be requested Flat Fee Parks & Rec. 14 days or more in advance.

Rental athletic facility cancellation fee 55.00$ No Res. No. 24-9316 Prop 26 Exception: 4 Applies to athletic facilities. 56.00$ 1.8% Collected by:

Parks & Rec. Full Cost: 57.94$
Field Preparation
Cost per day Charged by: Date 4/19/2022 Objective: Recover Cost Cost per day Parks & Rec. Prop 26 Exception: 4
Non-Profit 30.00$ No Res. No. 22-9081 & Full Cost: Varies 31.00$ 3.3% Collected by: 22-9082 1% - 20% Cost Recovery
Resident 150.00$ No Parks & Rec. Market Rate 155.00$ 3.3% Commercial / Non-Resident 300.00$ No Market Rate 310.00$ 3.3% Amplified Music Permit 77.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 79.00$ 2.6% per event, per day Parks & Rec. per event, per day
Res. No. 24-9316 Prop 26 Exception: 4
Collected by:

Parks & Rec. Full Cost: 80.47$
Reference: CMD 109 12 - 5
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Youth & Teen Center: Multi-Purpose Room Charged by: Date 4/23/2024 Objective: Recover Cost Hourly city staff costs may be Parks & Rec. Prop 26 Exception: 4 charged in addition to the room Non-Profit meeting 20.00$ No Res. No. 24-9316 Full Cost: Varies rental fee. Staffing needs Unchanged - Refer to per meeting Collected by: 1% - 20% Cost Recovery determined by Parks & Current Fee Parks & Rec. Recreation staff based on
Non-Profit event 20.00$ No 1% - 20% Cost Recovery hours of use, estimated Unchanged - Refer to per hour attendance and scope of event. Current Fee
Resident event 60.00$ No Market Rate 62.00$ 3.3% per hour per hour
Commercial / Non-Resident event 90.00$ No Market Rate 93.00$ 3.3% per hour per hour
Youth & Teen Center: Classrooms Charged by: Date 4/19/2022 Objective: Recover Cost Hourly city staff costs may be Parks & Rec. charged in addition to the room
Non-Profit meeting 20.00$ No Res. No. 22-9081 & Prop 26 Exception: 4 rental fee. Staffing needs Unchanged - Refer to per meeting Collected by: 22-9082 determined by Parks & Current Fee Parks & Rec. Full Cost: Varies Recreation staff based on hours of use, estimated
attendance and scope of event.

Special Event Application Fee Charged by: Date 4/23/2024 Objective: Recover Cost One time application processing Parks & Rec. fee per request; non-exclusive
Resident Special Event 345.00$ No Res. No. 24-9316 Prop 26 Exception: 4 use of public property based 357.00$ 3.5% Collected by: on Department Head approval.

Resident, Non-Profit 28.00$ No Parks & Rec. Full Cost: 558.90$ City Code 9.35060 Unchanged - Refer to Current Fee
City Sponsored Event No Fee No Unchanged - Refer to
Current Fee
Non-Resident 540.00$ No 558.00$ 3.3% Neighborhood Parks Flat rate per table Charged by: Date 4/19/2022 Objective: Recover Cost Hourly city staff costs may be Flat rate per table per day Parks & Rec. Prop 26 Exception: 4 charged in addition to the room per day Res. No. 22-9081 & Full Cost: Varies rental fee. Staffing needs Non-Profit Event 20.00$ No Collected by: 22-9082 1% - 20% Cost Recovery determined by Parks & Unchanged - Refer to Recreation staff based on Current Fee
Parks & Rec. hours of use, estimated
Resident Event 60.00$ No Market Rate attendance and scope of event. 62.00$ 3.3% Reference: CMD 109 12 - 6
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Jump House Permit Flat rate per jump house Charged by: Date 4/19/2022 Objective: Recover Cost Hourly city staff costs may be Flat rate per jump house per day Parks & Rec. charged in addition to the room per day Res. No. 22-9081 & Prop 26 Exception: 4 rental fee. Staffing needs Resident - Jump House Permit 25.00$ No Collected by: 22-9082 determined by Parks & Unchanged - Refer to Parks & Rec. Full Cost: 91.70$ Recreation staff based on Current Fee hours of use, estimated
attendance and scope of event.

Pool Rentals Cost per hour Charged by: Date 4/19/2022 Objective: Recover Cost Hourly city staff costs may be Cost per hour Parks & Rec. charged in addition to the room
Shared Facility 80.00$ No Res. No. 22-9081 & Prop 26 Exception: 4 rental fee. Staffing needs 82.00$ 2.5% Collected by: 22-9082 determined by Parks &
Exclusive Use 280.00$ No Parks & Rec. Full Cost: Varies Recreation staff based on 289.00$ 3.2% hours of use, estimated
attendance and scope of event.

Tournament Fee Charged by: Date 4/19/2022 Objective: Recover Cost Fee is exclusive of Competitions, Meets, and Tournaments Parks & Rec. Prop 26 Exception: 4 applicable fee charged by that include competitors from other cities. Res. No. 22-9081 & Full Cost: Varies vendor, collected by the Collected by: 22-9082 City.

Parks & Rec.

Non-Profit 110.00$ No Date 4/18/2023 40% Cost Recovery Hourly city staff costs may be 113.00$ 2.7% per day charged in addition to the base per day
Res. No. 23-9221 rental rates and field prep fees.

Resident 110.00$ No 40% Cost Recovery Staffing needs determined by 113.00$ 2.7% per day Parks & Recreation staff based per day
on hours of use, estimated
Commercial / Non-Resident 280.00$ No 100% Cost Recovery attendance and scope of event. 289.00$ 3.2% per day per day
Special Event Parking at Parks and Per Space Charged by: Date 4/23/2024 Objective: Recover Cost Per Space Recreation Facilities Parks & Rec.

Res. No. 24-9316 Prop 26 Exception: 4
Youth Soccer Park: 152 spaces Collected by:

Reed & Grant: 202 spaces Parks & Rec. Full Cost: Varies General Parking 10.00$ No Unchanged - Refer to Current Fee
Premium Parking 100.00$ No 103.00$ 3.0% Reference: CMD 109 12 - 7
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Special Event Food, Permitted Activity, Per Event No Charged by: Date 4/19/2022 Objective: Recover Cost Unchanged - Refer to Event Sponsorship, or Merchandise $ 0 - 50,000 Parks & Rec. Current Fee Vendor Res. No. 22-9081 & Prop 26 Exception: 4
Collected by: 22-9082
Parks & Rec. Full Cost: Varies
Recreation Classes Per Activity No Charged by: Date 4/19/2022 Objective: Recover Cost Detailed in Activity Guide Unchanged - Refer to $ 0 - 5,000 Parks & Rec. Current Fee
Res. No. 22-9081 & Prop 26 Exception: 4
Collected by: 22-9082
Parks & Rec. Full Cost: Varies
Community Garden Space Membership Per Year Charged by: Date 4/19/2022 Objective: Recover Cost Not a new fee. Separating from Per Year Parks & Rec. Recreation Classes line item
ADA / Senior Bed or Community Facility 55.00$ No Res. No. 22-9081 & Prop 26 Exception: 4 above for clarity. 56.00$ 1.8% District Collected by: 22-9082
Shared / Group Bed 175.00$ No Parks & Rec. Full Cost: Varies 181.00$ 3.4% Individual Bed 80.00$ No 82.00$ 2.5% Half Shared / Group Bed 88.00$ No 91.00$ 3.4% Recreation Course / Class Cancellation Per Transaction Charged by: Date 4/23/2024 Objective: Recover Cost Not a new fee. Adding to fee Unchanged - Refer to Withdrawal Administration Fee 15.00$ No Parks & Rec. schedule for clarity. Detailed Current Fee Res. No. 24-9316 Prop 26 Exception: 4 in Activity Guide.

Collected by:

Parks & Rec. Full Cost: Varies
Reference: CMD 109 12 - 8
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95050
Quimby Act (Single Fam) 59,507.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 57,394.00$ -3.6% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95050
Quimby Act (Multi Fam) 40,230.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 38,802.00$ -3.5% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95050
Mitigation Fee Act (Single Fam) 53,186.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 51,392.00$ -3.4% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95050
Mitigation Fee (Multi Fam) 35,956.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 34,744.00$ -3.4% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95051
Quimby Act (Single Fam) 61,201.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 58,785.00$ -3.9% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95051
Quimby Act (Multi Fam) 41,375.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 39,741.00$ -3.9% Engineering 2/24/2015
Full Cost:

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number &
Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 12 - 9
Department / Division: Parks & Recreation / Recreation Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number &
Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95051
Mitigation Fee (Single Fam) 54,655.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 52,597.00$ -3.8% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95051
Mitigation Fee (Multi Fam) 36,949.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 35,558.00$ -3.8% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95054
Quimby Act (Single Fam) 57,769.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 55,830.00$ -3.4% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95054
Quimby Act (Multi Fam) 39,055.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 37,744.00$ -3.4% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95054
Mitigation Fee (Single Fam) 51,679.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 50,036.00$ -3.2% Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95054
Mitigation Fee (Multi Fam) 34,938.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 33,827.00$ -3.2% Engineering 2/24/2015
Full Cost:

Reference: CMD 109 12 - 10

Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Alarm Permit 37.00$ No Charged by: Date 5/8/2018 Objective: Penalty Regulatory Fee Unchanged - Refer to Current Fee
Police Res. No. 1748
Non-Registration 50.00$ No Prop 26 Exception: 3 Unchanged - Refer to Date 1/14/2020 Current Fee
Collected by:

Annual Renewal 15.00$ No Police Res. No. 2012 Full Cost: 108.16$ Unchanged - Refer to Current Fee
Late 25.00$ No Unchanged - Refer to Current Fee
Reinstatement 15.00$ No Unchanged - Refer to Current Fee
Bingo Organization (License Fee) 1,428.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include DOJ / FBI 50.00$ -96.5% Police Live Scan fees.

Res. No. 24-9316 Prop 26 Exception: 3 Regulatory Fee
Collected by:

Police Full Cost: 1,478.16$ City Code Section 5.75.180 CAD Report for Legal Purposes 0.20$ No Charged by: Date 6/10/2008 Objective: Recover Cost Per Public Records Act Unchanged - Refer to per page per page Police Current Fee
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 0.21$
CD for Legal Purposes 3.00$ No Charged by: Date 6/10/2008 Objective: Recover Cost Unchanged - Refer to per CD Police Current Fee
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 3.11$
Citation Sign-Off 34.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 35.00$ 2.9% Non-Santa Clara Citations Only Police
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 36.05$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 13 - 1
Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Clearance Letter 49.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 50.00$ 2.0% Police
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 50.97$
Closing Out Sale 229.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee 237.00$ 3.5% Police
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 237.02$
Color Photographs Per copy Charged by: Date 6/10/2008 Objective: Recover Cost Actual cost of duplication. Per copy Police
4" x 6" Actual Cost No Res. No. 08-7525 Prop 26 Exception: 1, 2 Unchanged - Refer to Current Fee
Collected by:
5" x 7" Actual Cost Police Full Cost: Actual Cost Unchanged - Refer to Current Fee
8" x 10" Actual Cost Unchanged - Refer to
Current Fee
11" x 14" Actual Cost Unchanged - Refer to
Current Fee
16" x 20" Actual Cost Unchanged - Refer to
Current Fee
20" x 30" Actual Cost Unchanged - Refer to
Current Fee
Crime Analysis Reports 0.20$ No Charged by: Date 6/10/2008 Objective: Recover Cost Per Public Records Act Unchanged - Refer to per page Police User Fee Current Fee
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 0.21$
Dispatch Service Required for 248.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 256.00$ 3.2% Special Events per hour Police per hour
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 256.68$
Reference: CMD 109 13 - 2
Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Driving Under the Influence Per current salary No Charged by: Date 6/15/1999 Objective: Recover Cost Unchanged - Refer to Emergency Response schedule plus Police Current Fee
benefits and current Government Code Prop 26 Exception: 1, 2 citywide overhead Collected by: Sections 53150
Finance 53154 Full Cost: As calculated
False Alarm Calls Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee Police Penalty
Second False Alarm 50.00$ No Res. No. 24-9316 Unchanged - Refer to Current Fee
Collected by: Prop 26 Exception: 1, 2, 5
Third False Alarm 115.00$ No Finance Unchanged - Refer to Current Fee
Full Cost: 199.58$
Fourth False Alarm ($25 Penalty) 140.00$ No Unchanged - Refer to Current Fee
Fifth & Subsequent False Alarm 165.00$ No Unchanged - Refer to ($50 Penalty) Current Fee
False Alarm Calls Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee Police Penalty
Hold-Up Alarm 125.00$ No Res. No. 24-9316 Prop 26 Exception: 1, 2, 5 Unchanged - Refer to in addition to alarm fees Collected by: Current Fee
Finance Full Cost: 156.80$
Fingerprinting Services 69.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 71.00$ 2.9% Does not include mandated FBI / DOJ Police FBI / DOJ Live Scan Fees.

Fees Res. No. 24-9316 Prop 26 Exception: 1, 2 Regulatory Fee Collected by:

Police Full Cost: 72.11$ Consolidating fingerprint services fees into one
ID Card Renewal 104.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 107.00$ 2.9% (for multiple applicants) Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 108.16$
Reference: CMD 109 13 - 3
Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Massage Establishment Application 834.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 863.00$ 3.5% Police DOJ / FBI Live Scan Fees.

Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 1,557.42$
Massage Establishment Application - 169.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 174.00$ 3.0% Sole Proprietor Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 1,130.22$
Massage Establishment Renewal 669.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee 692.00$ 3.4% Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 1,341.10$
Massage Establishment Renewal - 117.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 121.00$ 3.4% Sole Proprietor Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 967.98$
Massage Establishment Permit 53.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 54.00$ 1.9% Amendments Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 108.16$
Motor Funeral Escort Company Initial 365.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 377.00$ 3.3% Police DOJ / FBI Live Scan Fees.

Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 378.55$
Reference: CMD 109 13 - 4
Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Motor Funeral Escort Company Renewal 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 161.00$ 3.2% Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Motor Funeral Escort Driver Initial 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 161.00$ 3.2% Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Motor Funeral Escort Driver Renewal 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 161.00$ 3.2% Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Off-Duty Employment Per current salary No Charged by: Date 6/6/2006 Objective: Recover Cost Unchanged - Refer to schedule plus Police Current Fee
benefits and current Res. No. Prop 26 Exception: N/A
citywide overhead Collected by:

Finance Full Cost: As calculated
Pawn / Secondhand Dealer - Registration 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 161.00$ 3.2% Police DOJ / FBI Live Scan Fees.

Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 162.24$
Pawn / Secondhand Dealer - Renewal 104.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee 107.00$ 2.9% Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 108.16$
Reference: CMD 109 13 - 5
Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Photo CD's 3.00$ No Charged by: Date 6/10/2008 Objective: Recover Cost PRA - no labor fee Unchanged - Refer to per CD Police Current Fee
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 3.11$
Police Reports (per page) 0.20$ No Charged by: Date 6/10/2008 Objective: Recover Cost Per Public Records Act Unchanged - Refer to per page Police Current Fee
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 0.21$
Private Security - Registration 209.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 216.00$ 3.3% Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 216.32$
Private Security - Renewal 104.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 107.00$ 2.9% Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 108.16$
Public Entertainment Application 242.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 250.00$ 3.3% Police DOJ / FBI Live Scan Fees.

Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 250.47$
Public Entertainment Application - 189.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 195.00$ 3.2% Renewal Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 196.39$
Reference: CMD 109 13 - 6
Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Public Entertainment General Charged by: Date 2/15/2000 Objective: Penalty Police
Fines for Violation (Infraction): 150.00$ No Ord. No. 1748 Prop 26 Exception: 5 Unchanged - Refer to 1st Offense Collected by: Current Fee
Police Full Cost:

Public Entertainment General Charged by: Date 4/19/2022 Objective: Penalty Police
Fines for Violation (Infraction): 300.00$ No Res. No. 22-9081 Prop 26 Exception: 5 Unchanged - Refer to 2nd Offense Collected by: Current Fee
Police Full Cost:

Public Entertainment General Charged by: Date 4/19/2022 Objective: Penalty Police
Fines for Violation (Infraction): 750.00$ No Ord. No. 22-9081 Prop 26 Exception: 5 Unchanged - Refer to Subsequent Offenses Collected by: Current Fee
Police Full Cost:

Release of Stored Vehicles 100.00$ No Charged by: Date 4/18/2023 Objective: Recover Cost Regulatory Fee 103.00$ 3.0% Police
Res. No. 23-9221 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 104.02$
Repo Fee (repossessed vehicles) 15.00$ No Charged by: Date 4/28/2020 Objective: Recover Cost Mandated by State Law Unchanged - Refer to Police Current Fee
Government Code Prop 26 Exception: 1, 2
Collected by: Section: 41612
Police Full Cost: 53.04$
Residential Parking Permit / Guest 34.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee Unchanged - Refer to Parking Permit (each) Police Current Fee
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 36.05$
Reference: CMD 109 13 - 7
Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Second Response Ordinance Per current salary No Charged by: Date 8/22/1990 Objective: Recover Cost Regulatory Fee Unchanged - Refer to schedule plus Police Current Fee
benefits and current Ord. No. 1849 Prop 26 Exception: 3 citywide overhead Collected by: Code Section:

Finance 9.05.020 Full Cost: As calculated
Solicitor / Peddler Application 365.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 377.00$ 3.3% Background Investigation Police DOJ / FBI Live Scan Fees.

Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 378.55$
Solicitor / Peddler Renewal 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 161.00$ 3.2% Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Solicitor / Peddler Application 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 161.00$ 3.2% Employee Only Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Taxicab / Pedicab Company 7,419.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 7,678.00$ 3.5% Application Police DOJ / FBI Live Scan Fees.

Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 7,679.18$
Taxicab / Pedicab Company 783.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 810.00$ 3.4% Renewal per year Police per year
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 811.18$
Reference: CMD 109 13 - 8
Department / Division: Police Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Taxicab / Pedicab Driver 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 161.00$ 3.2% Application Police DOJ / FBI Live Scan Fees.

Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 162.24$
Taxicab / Pedicab Driver 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee 161.00$ 3.2% Renewal, Retest or Reinspection Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Taxicab / Pedicab 209.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee 216.00$ 3.3% Annual Safety Inspection Fee Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 216.32$
Tow Drivers - Application 156.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Does not include mandated 161.00$ 3.2% Police DOJ / FBI Live Scan Fees.

Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 162.24$
Tow Drivers - Permit Renewal No Charged by: Date Objective: Recover Cost Adding to fee schedule. 47.00$ New Police Included in Tow Operator
Res. No. Prop 26 Exception: 3 Agreement - Regulatory Fee Collected by:

Police Full Cost: 47.00$
USB Drive for Police Reports 8.00$ No Charged by: Date 7/16/2019 Objective: Recover Cost Unchanged - Refer to Police Current Fee
Res. No. Prop 26 Exception: 2
Collected by:

Police Full Cost: 8.28$
Reference: CMD 109 13 - 9
Department / Division: Police / SVACA Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
ANIMAL CONTROL Charged by: Date 3/27/2019 Objective: Recover Cost For owners who are 65 years LICENSE FEES Silicon Valley User Fee of age or older, there is no Animal Control Res. No. Penalty license fee charged for the Dog License Fees Authority SVACA 2019-2 first animal. Fees will apply Prop 26 Exception: 3 to the second and additional
Altered One Year 25.00$ No Collected by: animals for such owners.

Silicon Valley
Altered Two Years 37.00$ No Animal Control Full Cost: N/A State law requires that dogs Authority must be licensed by the age
Altered Three Years 50.00$ No of (4) four months.

Fee collected to offset the cost of
Unaltered One Year 100.00$ No expenses for a new web based Failure to license a dog by licensing program. The program the age of (4) four months, Cat License Fees simplifies the licensing process for or within 30 days of animal owners and increases staff acquisition or within 30 days Altered One Year 15.00$ No efficiency. Service is optional. of residency (for a new Owners may still renew or license in resident) or within 30 days of Altered Two Years 23.00$ No person or by mail. the expiration date of a previously issued license will
Altered Three Years 30.00$ No be subject to the Late (Delinquent) Fee.

Unaltered One Year 50.00$ No Dog licenses are not
Other License Fees Date 3/27/2019 transferable from one owner to the next.

Replacement Tag 5.00$ No Res. No.

SVACA 2019-2
Late (Delinquent) Fee - Licensing 35.00$ No Courtesy Fee 2.00$ No

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 13 - 10
Department / Division: Police / SVACA Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
SHELTER SERVICES Charged by: Date 3/27/2019 Objective: Recover Cost Includes animals impounded Silicon Valley Penalty for rabies quarantine.

Impound / Redemption Fees Animal Control Res. No.

Dogs and Cats Authority SVACA 2019-2 Prop 26 Exception: 3 Offenses accumulate through the life of the animal.

Altered - 1st Offense 35.00$ No Collected by: Full Cost: N/A Silicon Valley
Unaltered - 1st Offense 100.00$ No Animal Control Authority
Altered or Unaltered - 2nd Offense 125.00$ No Altered or Unaltered - 3rd Offense 175.00$ No Altered or Unaltered - 4th Offense 205.00$ No Other Domestic / Exotic
Large Animal (horse, pig, etc.) 75.00$ No Small Animal (bird, rabbit, etc.) 28.00$ No Boarding Fees
per day or portion thereof
Dogs and Cats 22.00$ No
All Other Animals 11.00$ No
Reference: CMD 109 13 - 11
Department / Division: Police / SVACA Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
ADOPTION FEES Charged by: Date 3/27/2019 Objective: Recover Cost SVACA reserves the right to Silicon Valley User Fee deny adoptions in certain
Type of Animal Animal Control Res. No. circumstances for cause.

Authority SVACA 2019-2 Prop 26 Exception: 3
Dog 150.00$ No
Collected by: Full Cost: N/A
Cat 100.00$ No Silicon Valley
Animal Control
Kitten (less than six months) 150.00$ No Authority Rabbit 30.00$ No
Small Animal 20.00$ No
Bird 20.00$ No
Dog Behavior Training Deposit 100.00$ No ANIMAL SURRENDER FEES Charged by: Date 3/27/2019 Objective: Recover Cost Silicon Valley User Fee
Dog / Cat 150.00$ No Animal Control Res. No.

Authority SVACA 2019-2 Prop 26 Exception: 3
Other 40.00$ No
Collected by: Full Cost: N/A
Disposal Silicon Valley
Animal Control
Small Animals 25.00$ No Authority Dog / Cat / Rabbit 50.00$ No Dogs and others over 150 lbs. 125.00$ No Reference: CMD 109 13 - 12
Department / Division: Police / SVACA Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
TRAP FEES Charged by: Date 3/27/2019 Objective: Recover Cost Maximum rental period on all Silicon Valley User Fee traps is 2 weeks, unless
No Daily Fees Animal Control Res. No. extended by SVACA staff.

Authority SVACA 2019-2 Prop 26 Exception: 3
Refundable Deposit 100.00$ No
Collected by: Full Cost: N/A
Silicon Valley
Animal Control
Authority
OTHER FEES Charged by: Date 3/27/2019 Objective: Recover Cost Silicon Valley User Fee
Animal Establishment Fee 200.00$ No Animal Control Res. No. Penalty Authority SVACA 2019-2
Animal Rescue Registration 25.00$ No Prop 26 Exception: 3 Collected by:

Keeping of Animal or Fowl Permit 50.00$ No Silicon Valley Animal Control Full Cost: N/A
Dangerous Dog Fee 200.00$ No Authority Field Service Charge, per trip 50.00$ No Home Quarantine Fee 50.00$ No Returned Check Charge 50.00$ No Lab Processing Fee 100.00$ No
Volunteer Materials Fee 35.00$ No Records Request Fee 0.20$ No per page
Reference: CMD 109 13 - 13

Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Parcel Map and Record of Survey 8,361.00$ Yes Charged by: Date 4/18/2023 Objective: Recover Cost 8,653.00$ 3.5% Checking Fee (includes 3 checks reviews) per map Engineering / Prop 26 Exception: 1, 2, 3, 6 per map LPD Res. No. 23-9221 Full Cost: 8,653.64$
Parcel Map and Record of Survey 1,470.00$ Yes 1,521.00$ 3.5% Checking Fee (4th and Each subsequent Collected by: Full Cost: 1,521.45$ reviews) Finance
Final Map Checking Fee - First 5 Lots 10,640.00$ Yes Charged by: Date 4/18/2023 Objective: Recover Cost 11,012.00$ 3.5% (includes 3 checks reviews) Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 23-9221 Full Cost: 11,012.40$
Final Map Checking Fee - First 5 Lots 1,470.00$ Yes 1,521.00$ 3.5% (4th and Each subsequent reviews) Collected by: Full Cost: 1,521.45$ Finance
Final Map Checking Fee per lot beyond 484.00$ Yes Full Cost: 500.94$ 500.00$ 3.3% 5 lots (includes 3 checks reviews)
Final Map Checking Fee per lot beyond 484.00$ Yes Full Cost: 500.94$ 500.00$ 3.3% 5 lots (4th and Each subsequent reviews)
Amended Parcel Map and Record of 3,491.00$ Yes Charged by: Date 4/18/2023 Objective: Recover Cost 3,613.00$ 3.5% Survey Checking Fee per map Engineering / Prop 26 Exception: 1, 2, 3, 6 per map (includes 2 checks reviews) LPD Res. No. 23-9221 Full Cost: 3,613.19$ Amended Parcel Map and Record of 1,081.00$ Yes 1,118.00$ 3.4% Survey Checking Fee (for the 3rd and Collected by: Full Cost: 1,118.84$ Each subsequent reviews) Finance
Amended Final Map Checking Fee 3,491.00$ Yes Charged by: Date 4/18/2023 Objective: Recover Cost 3,613.00$ 3.5% (includes 2 checks reviews) per map Engineering / Prop 26 Exception: 1, 2, 3, 6 per map LPD Res. No. 23-9221 Full Cost: 3,613.19$
Amended Final Map Checking Fee 1,081.00$ Yes 1,118.00$ 3.4% (for the 3rd and Each subsequent reviews) Collected by: Full Cost: 1,118.84$ Finance
Processing Certificate of Correction 3,907.00$ Yes Charged by: Date 4/18/2023 Objective: Recover Cost 4,043.00$ 3.5% (includes 2 checks reviews) per map Engineering / Prop 26 Exception: 1, 2, 3, 6 per map LPD Res. No. 23-9221 Full Cost: 4,043.75$
Processing Certificate of Correction (for 1,271.00$ Yes 1,315.00$ 3.5% the 3rd and Each subsequent reviews) Collected by: Full Cost: 1,315.49$ (for Final / Parcel Maps) Finance

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 14 - 1
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Assessment District Reappointment Fee - Charged by: Date 4/23/2024 Objective: Recover Cost Assemblage / Parcel Split Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 24-9316 Full Cost: 9,828.36$
First Two Parcels 9,496.00$ No 9,828.00$ 3.5% Collected by: Full Cost: 2,511.95$
Each Subsequent Parcel 2,427.00$ No Finance 2,511.00$ 3.5% Processing Certificate of Compliance 1,773.00$ No Charged by: Date 4/18/2023 Objective: Recover Cost 1,835.00$ 3.5% (includes 2 checks reviews) per certificate Engineering / Prop 26 Exception: 1, 2, 3, 6 per certificate LPD Res. No. 23-9221 Full Cost: 1,835.06$
Processing Certificate of Correction (for 1,005.00$ No 1,040.00$ 3.5% the 3rd and Each subsequent reviews) Collected by: Full Cost: 1,040.18$ Finance
Lot Line Adjustment Processing 7,610.00$ Yes Charged by: Date 4/18/2023 Objective: Recover Cost 7,876.00$ 3.5% (includes 3 checks reviews) per certificate Engineering / Prop 26 Exception: 1, 2, 3, 6 per certificate LPD Res. No. 23-9221 Full Cost: 7,876.35$
Lot Line Adjustment Processing 1,271.00$ Yes 1,315.00$ 3.5% (For the 4th and Each subsequent reviews) Collected by: Full Cost: 1,315.49$ Finance
Security Deposit for Survey Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Engineering / Prop 26 Exception: 1, 2, 3, 6 in CCI
Property Monument 1,921.00$ No LPD Res. No. 24-9316 Full Cost: 1,988.50$ 1,915.24$ -0.3% per monument See note 1 per monument
Minimum Security Deposit 3,843.00$ No Collected by: Full Cost: 3,978.04$ 3,831.47$ -0.3% minimum per map Finance minimum per map
Security Deposit for Survey City Standard Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Street Engineering / Prop 26 Exception: 1, 2 in CCI
Monuments 2,562.00$ No LPD Res. No. 24-9316 Full Cost: 2,652.03$ 2,554.31$ -0.3% per monument See note 1 per monument
Minimum Security Deposit 3,843.00$ No Collected by: Full Cost: 3,978.04$ 3,831.47$ -0.3% minimum per map Finance minimum per map
Reference: CMD 109 14 - 2
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Encroachment Permit Charged by: Date 4/23/2024 Objective: Recover Cost Engineering /
Processing Fee LPD Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 for Project up to $25K 421.00$ Yes Collected by: Full Cost: 436.25$ 435.00$ 3.3% per permit Finance per permit
for Project over $25K 843.00$ Yes Full Cost: 872.51$ 872.00$ 3.4% per permit per permit
Permit Extension for all Projects 466.00$ Yes Full Cost: 482.57$ only applies to extensions for 482.00$ 3.4% per permit all projects per permit
Encroachment Permit Charged by: Date 4/23/2024 Objective: Recover Cost Engineering / Prop 26 Exception: 1, 2, 3
Engineering Plan Check for Projects up 776.00$ Yes LPD Res. No. 24-9316 Full Cost: 803.94$ 803.00$ 3.5% to $25K (per plan set) - includes 3 checks
reviews
Collected by:

Engineering Plan Check for Projects 1,553.00$ Yes Finance Full Cost: 1,607.87$ 1,607.00$ 3.5% between $25K and $35K (per plan set) -
includes 3 checks reviews
Engineering Plan Check for Projects over 1,854.00$ Yes Full Cost: 1,919.15$ 1,918.00$ 3.5% $35K (per plan sheet) - includes 3 checks
reviews
Engineering Plan Check (per plan set) for 167.00$ Yes Full Cost: 173.80$ 172.00$ 3.0% Projects up to $25K - 4th and Each
subsequent reviews
Engineering Plan Check (per plan set) for 167.00$ Yes Full Cost: 173.80$ 172.00$ 3.0% Projects between $25K and $35K - 4th
and Each subsequent reviews
Engineering Plan check (per plan sheet) 309.00$ Yes Full Cost: 319.82$ 319.00$ 3.2% for Projects over $35K - 4th and Each
subsequent reviews
Engineering Plan Check (per plan sheet) 508.00$ Yes Full Cost: 526.21$ 525.00$ 3.3% for Projects over $35K for revisions
after EP issuance
Reference: CMD 109 14 - 3
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Encroachment Permit Charged by: Date 4/23/2024 Objective: Recover Cost Engineering /
Engineering Inspection LPD Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 $0-$15K 494.00$ Yes Collected by: Full Cost: 511.29$ 511.00$ 3.4% Finance
$15,001-$25K-base + 4.04% of cost 617.50$ Yes Full Cost: 639.11$ 639.00$ 3.5% above $15K
$25,001-$35K-base + 5.27% of cost 1,021.00$ Yes Full Cost: 1,056.74$ 1,056.00$ 3.4% above $25K
$35,001-$50K-base + 23.49% of cost 1,548.00$ Yes Full Cost: 1,602.18$ 1,602.00$ 3.5% above $35K
$50,001-$100K-base + 4.06% of cost 5,072.00$ Yes Full Cost: 5,249.52$ 5,249.00$ 3.5% above $50K
$101K-$200K-base + 6.09% of cost 7,100.80$ Yes Full Cost: 7,349.33$ 7,349.00$ 3.5% above $100K
$201K-$500K-base + 5.58% of cost 13,187.20$ Yes Full Cost: 13,648.75$ 13,648.00$ 3.5% above $200K
$501K-$1M-base + 5.27% of cost above 29,924.80$ Yes Full Cost: 30,972.17$ 30,972.00$ 3.5% $500K
>$1M; base 56,299.20$ Yes Full Cost: 58,269.67$ 58,269.00$ 3.5% >$1M for each additional $500K or 14,201.60$ Yes Full Cost: 14,698.66$ 14,698.00$ 3.5% fraction thereof
Encroachment Permit Charged by: Date 4/18/2023 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
Slurry Seal Fee 2.51$ Yes LPD Res. No. 23-9221 Prop 26 Exception: 1, 2, 3 2.50$ -0.3% per square ft, or See note 1 per square ft, or
Collected by: Full Cost: 119.23$
115.00$ Yes Finance 114.66$ -0.3% minimum minimum
Reference: CMD 109 14 - 4
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Encroachment Permit Charged by: Date 4/23/2024 Objective: Recover Cost See Article 2 of Chapter 3.1 Field Marking - Storm Drain Engineering / of Div. 5 of Title 1 of the LPD Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 Government Code.

Up to 50 ft of excavation 185.00$ Yes Full Cost: 191.73$ 191.00$ 3.2% Collected by:

Over 50 ft of excavation 185.00$ Yes Finance Full Cost: 191.73$ 191.00$ 3.2% plus plus
123.00$ Yes Full Cost: 127.82$ 127.00$ 3.3% each additional 50 ft or each additional 50 ft or
fraction thereof fraction thereof
Encroachment Permit Charged by: Date 4/23/2024 Objective: Recover Cost See Note 2 Field Marking - Traffic Signal Engineering /
LPD Res. No. 24-9316 Prop 26 Exception: 2
Up to 50 ft of excavation 150.00$ Yes Full Cost: 155.25$ 155.00$ 3.3% Collected by:

Over 50 ft of excavation 150.00$ Yes Finance Full Cost: 155.25$ 155.00$ 3.3% plus plus
100.00$ Yes Full Cost: 103.50$ 103.00$ 3.0% each additional 50 ft or each additional 50 ft or
fraction thereof fraction thereof
Copy of Charged by: Date 6/9/2009 Objective: Recover Cost Citywide rate for copying Engineering / plus sales tax.

Design Criteria 0.20$ No LPD Res. No. 09-7631 Prop 26 Exception: 1, 2 Unchanged - Refer to per page for public Current Fee
Standard Details Collected by: Full Cost: Cost

0.05$ No Finance Unchanged - Refer to Standard Specifications per page for employees Current Fee Subdivision Code
Property Development Ordinance
Black Line Print of Plan on File Actual Cost No Charged by: Date 6/9/2009 Objective: Recover Cost Actual cost of duplication Unchanged - Refer to Engineering Current Fee
Res. No. 09-7631 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: Cost
Reference: CMD 109 14 - 5
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Record Drawings Archiving Fee 88.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 91.00$ 3.4% per sheet Engineering / per sheet
LPD Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 91.08$
Finance
Watershed Map Actual Cost No Charged by: Date 6/9/2009 Objective: Recover Cost Actual cost of duplication Unchanged - Refer to Engineering / Current Fee
LPD Res. No. 09-7631 Prop 26 Exception: 1, 2
Collected by: Full Cost: Cost
Finance
Encroachment Agreement Application Charged by: Date 4/23/2024 Objective: Recover Cost Engineering /
Into Easements 5,525.00$ Yes LPD Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 5,718.00$ 3.5% per application per application
Collected by: Full Cost: 5,718.89$
Finance
Encroachment Agreement Application Charged by: Date 4/23/2024 Objective: Recover Cost Engineering /
Into Rights-of-Way 6,027.00$ Yes LPD Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 6,237.00$ 3.5% per application per application
Collected by: Full Cost: 6,238.46$
Finance
Preparation of Agreement / Easement / 5,666.00$ Yes Charged by: Date 4/18/2023 Objective: Recover Cost 5,864.00$ 3.5% Grant Deed (includes 2 checks reviews) per document Engineering / Prop 26 Exception: 1, 2 per document LPD Res. No. 23-9221 Full Cost: 5,864.31$
Preparation of Agreement / Easement / 1,271.00$ Yes 1,315.00$ 3.5% Grant Deed (for 3rd and Each subsequent for 3rd and subsequent Collected by: Full Cost: 1,315.49$ Each subsequent reviews) review Finance review
Preparation of Minor Agreement / 4,452.00$ Yes Full Cost: 4,607.82$ 4,607.00$ 3.5% Easement / Grant Deed per document per document
(includes 2 checks reviews)
Preparation of Minor Agreement / 1,271.00$ Yes Full Cost: 1,315.49$ 1,315.00$ 3.5% Easement / Grant Deed (for 3rd and Each for 3rd and subsequent Each subsequent subsequent reviews) review review
Reference: CMD 109 14 - 6
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Combination Agreement / Grant Deed for 7,481.00$ Yes Charged by: Date 4/18/2023 Objective: Recover Cost 7,742.00$ 3.5% for the same lot (includes two 2 checks both documents Engineering / Prop 26 Exception: 1, 2 both documents reviews) LPD Res. No. 23-9221 Full Cost: 7,742.84$
Combination Agreement / Grant Deed for 1,271.00$ Yes 1,315.00$ 3.5% the same lot (For the 3rd and Each Collected by: Full Cost: 1,315.49$ subsequent reviews) Finance
Document Recordation Fee Actual Cost No Charged by: Date 6/10/2008 Objective: Recover Cost Fee to recover direct costs for Unchanged - Refer to Engineering / recording documents at the Current Fee
LPD Res. No. 08-7527 Prop 26 Exception: 1, 2 County Recorder.

Collected by: Full Cost: Cost
Finance
Review of Agreements & Easements 4,965.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 5,138.00$ 3.5% per document Engineering / Prop 26 Exception: 1, 2 per document LPD Res. No. 24-9316 Full Cost: 5,138.78$
Review of Minor Agreements & 3,037.00$ Yes 3,143.00$ 3.5% Easements per document Collected by: Full Cost: 3,143.30$ per document Finance
Review of Right of Entry Agreement onto 5,815.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 6,018.00$ 3.5% City Property per agreement Engineering / Prop 26 Exception: 1, 2 per agreement LPD Res. No. 24-9316 Full Cost: 6,018.53$
Review of Permit to Enter Agreements 5,815.00$ Yes 6,018.00$ 3.5% onto City Property per agreement Collected by: Full Cost: 6,018.53$ per agreement Finance
Outside 3rd Party Review or Inspection Actual Cost with initial No Charged by: Date Objective: Recover Cost Unchanged - Refer to of Items within public ROW or City deposit Engineering / Current Fee Easements LPD Res. No. Prop 26 Exception: 1, 2
Collected by: Full Cost: Cost
Finance
Overtime Plan Check, Mapping Review, Actual Cost with initial No Charged by: Date Objective: Recover Cost Unchanged - Refer to etc. deposit Engineering / Current Fee
LPD Res. No. Prop 26 Exception: 1, 2
Collected by: Full Cost: Cost
Finance
Reference: CMD 109 14 - 7
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Outside 3rd Party Review for Survey Actual Cost with initial No Charged by: Date Objective: Recover Cost Unchanged - Refer to or Mapping deposit Engineering / Current Fee
LPD Res. No. Prop 26 Exception: 1, 2
Collected by: Full Cost: Cost
Finance
Storm Drain Outlet Charge 8,901.71$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change 8,875.00$ -0.3% per acre Engineering / in CCI per acre
LPD Res. No. 24-9316 Prop 26 Exception: 6
See note 1
Collected by: Full Cost: 9,213.27$
Finance
Storm Drain Outlet Charge Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
Institutional 8,901.71$ Yes LPD Res. No. 24-9316 Prop 26 Exception: 6 8,875.00$ -0.3% per acre See note 1 per acre
Allowed under certain conditions 2,949.72$ Yes Collected by: Full Cost: varies 2,940.87$ -0.3% per acre Finance per acre
Sanitary Sewer Outlet Charge 522.79$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change 521.22$ -0.3% per unit Engineering / in CCI per unit
Residential - Single Family LPD Res. No. 24-9316 Prop 26 Exception: 6 (choose the greatest and add 1,965.63$ Yes See note 1 1,959.73$ -0.3% Conveyance Fee) per lot Collected by: Full Cost: varies per lot Finance
8,901.71$ Yes 8,875.00$ -0.3% per acre per acre
Sanitary Sewer Outlet Charge 734.87$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change 732.67$ -0.3% per lot Engineering / in CCI per lot
Trailers & Mobile Homes LPD Res. No. 24-9316 Prop 26 Exception: 6 (choose the greatest and add 8,901.71$ Yes See note 1 8,875.00$ -0.3% Conveyance Fee) per acre Collected by: Full Cost: varies per acre Finance
Reference: CMD 109 14 - 8
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Sanitary Sewer Outlet Charge 522.79$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change 521.22$ -0.3% per unit Engineering / in CCI per unit
Condo & Planned Unit Development LPD Res. No. 24-9316 Prop 26 Exception: 6 (choose the greatest and add 8,901.71$ Yes See note 1 8,875.00$ -0.3% Conveyance Fee) per acre Collected by: Full Cost: varies per acre Finance
Sanitary Sewer Outlet Charge 1,965.63$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change 1,959.73$ -0.3% per lot Engineering / in CCI per lot
Commercial & Industrial LPD Res. No. 24-9316 Prop 26 Exception: 6 (choose the greatest and add 8,901.71$ Yes See note 1 8,875.00$ -0.3% Conveyance Fee) per acre Collected by: Full Cost: varies per acre Finance
Sanitary Sewer Outlet Charge - 4,218.00$ No Charged by: Date 6/15/2010 Objective: Recover Cost Unchanged - Refer to Conveyance Fee per dwelling unit Engineering / Current Fee LPD Res. No. 10-7741 Prop 26 Exception: 6
Accessory Dwelling Unit * 2,653.00$ No * See note 3 for accessory Unchanged - Refer to Collected by: Full Cost: 5,019.75$ dwelling unit rate justification Current Fee Finance
Full Cost: 3,157.42$
Sanitary Sewer Outlet Charge - Charged by: Date 6/15/2010 Objective: Recover Cost Conveyance Fee Engineering /
LPD Res. No. 10-7741 Prop 26 Exception: 6
Non-Residential 8.60$ No Unchanged - Refer to per gallon, per day Collected by: Full Cost: 8.95$ Current Fee Finance
Sanitary Sewer Capacity Model Run Fee 9,529.00$ No Charged by: Date 4/18/2023 Objective: Recover Cost 9,862.00$ 3.5% for initial run Engineering / for initial run
LPD Res. No. 23-9221 Prop 26 Exception: 6
time & material for time & material for
subsequent model run Collected by: Full Cost: 9,862.78$ subsequent model run Finance
Reference: CMD 109 14 - 9
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Existing Improvements Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
A. Street Improvements LPD Res. No. 24-9316 Prop 26 Exception: 6 See note 1
Residential 125.06$ No Collected by: Full Cost: varies 124.68$ -0.3% Finance
Commercial 265.25$ No 264.45$ -0.3% Industrial 190.92$ No 190.35$ -0.3% per front foot per front foot
Existing Improvements Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
B. Street Curbing 45.62$ No LPD Res. No. 24-9316 Prop 26 Exception: 6 45.48$ -0.3% per front foot See note 1 per front foot
Collected by: Full Cost: varies
Finance
Existing Improvements Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
C. Sidewalk Improvements 18.20$ No LPD Res. No. 24-9316 Prop 26 Exception: 6 18.15$ -0.3% per front foot See note 1 per front foot
Collected by: Full Cost: varies
Finance
Existing Improvements (Cont'd.) Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
D. Street Name Signs 0.32$ No LPD Res. No. 24-9316 Prop 26 Exception: 6 0.32$ -0.3% per front foot See note 1 per front foot
Collected by: Full Cost: varies
Finance
Existing Improvements (Cont'd.) Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
E. Sanitary Sewers 45.48$ No LPD Res. No. 24-9316 Prop 26 Exception: 6 45.34$ -0.3% per front foot See note 1 per front foot
Collected by: Full Cost: varies
Finance
Reference: CMD 109 14 - 10
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Existing Improvements (Cont'd.) Charged by: Date 4/23/2024 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
F. Storm Drains 45.48$ No LPD Res. No. 24-9316 Prop 26 Exception: 6 45.34$ -0.3% per front foot See note 1 per front foot
Collected by: Full Cost: varies
Finance
Existing Improvements (Cont'd.) Charged by: Date 4/23/2024 Objective: Recover Cost Original cost paid by the City Engineering / will be charged.

G. Right-of-Way and / or Easements Use original cost per No LPD Res. No. 24-9316 Prop 26 Exception: 6 Unchanged - Refer to square foot Each case is unique and will Current Fee
Collected by: Full Cost: varies require research for its original Finance cost.

Recreation Tax (Bedroom) Charged by: Date 8/5/1969 Objective: User Fee See SCCC 3.15.020 New Construction Permit Engineering /
LPD Ord. No. 1216 Prop 26 Exception: 6
First Bedroom 15.00$ No Unchanged - Refer to Current Fee
Collected by: Full Cost:

Each Additional 5.00$ No Finance Unchanged - Refer to per bedroom Current Fee
Recreation Tax (Bedroom) Charged by: Date 8/5/1969 Objective: User Fee See SCCC 3.15.020 Additions Engineering /
LPD Ord. No. 1216 Prop 26 Exception: 6
Each Additional 5.00$ No Unchanged - Refer to per bedroom Collected by: Full Cost: Current Fee
Finance
Traffic Impact Fee pre 10/22/18 Per Square Foot Charged by: Date 4/23/2024 Objective: Impact Dev. Fee Applicable to areas within the Per Square Foot Engineering / Traffic Impact Fee Area Map.

Office / R & D 1.27$ No LPD Res. No. 24-9316 Prop 26 Exception: 6 Projects entitled before 1.27$ -0.3% October 22, 2018 will pay this
Industrial 0.86$ No Collected by: Full Cost: varies Traffic Impact Fee. 0.86$ -0.3% Finance
Warehousing, utilities, communications 0.25$ No See Note 1 0.25$ -0.3% Hotel - Motel 516.39$ No See SCMC 17.15.330 514.84$ -0.3% per room per room
Reference: CMD 109 14 - 11
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Traffic Impact Fee Per Square Foot Charged by: Date 4/23/2024 Objective: Impact Dev. Fee Applicable citywide. Per Square Foot Engineering / Projects entitled on or after
Office / R & D 1.75$ No LPD Res. No. 24-9316 Prop 26 Exception: 6 October 22, 2018 will pay this 1.74$ -0.3% Traffic Impact Fee.

Industrial 0.96$ No Collected by: Full Cost: varies 0.96$ -0.3% Finance Retail elements with total
Warehousing, utilities, communications 0.28$ No sq. ft. < 50,000 sf and any 0.28$ -0.3% affordable housing units are
Retail 5.81$ No exempt from paying this fee. 5.79$ -0.3% Hotel - Motel 915.28$ No See Note 1 912.53$ -0.3%
per room per room
See SCMC 17.15.330
Multi-Family Residential 671.19$ No 669.18$ -0.3%
per dwelling unit per dwelling unit
Single-Family Residential 1,510.17$ No 1,505.64$ -0.3% per dwelling unit per dwelling unit
Tasman East Specific Plan Area Impact Charged by: Date 4/23/2024 Objective: Impact Dev. Fee See Note 1 Fee Engineering /
LPD Ord. No. 24-9316 Prop 26 Exception: 6
Multi-Family Residential 8,159.83$ No 8,135.35$ -0.3% per dwelling unit Collected by: Full Cost: varies per dwelling unit Finance
Patrick Henry Drive Specific Plan Charged by: Date 4/23/2024 Objective: Impact Dev. Fee Infrastructure Impact Fee Engineering /
LPD Ord. No. 24-9316 Prop 26 Exception: 6
Multi-Family Residential 10,449.43$ No Full Cost: 10,815.16$ 10,418.08$ -0.3% per dwelling unit Collected by: per dwelling unit See Note 1 per dwelling unit Finance
Office 22.80$ No Full Cost: 23.60$ 22.73$ -0.3%
per square foot per square foot per square foot
Oversize, Overweight Vehicles Fee
per vehicle Charged by: Date 6/7/2005 Objective: User Fee Statewide Rate per vehicle Engineering /
Single 16.00$ No Traffic Ord. No. Prop 26 Exception: 3 Unchanged - Refer to Current Fee
Annual 90.00$ No Collected by: Full Cost: 145.42$ Unchanged - Refer to Finance Current Fee
Reference: CMD 109 14 - 12
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Traffic Flow Map - mailed 46.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 47.00$ 2.2% each Engineering / Prop 26 Exception: 1, 2 each
Traffic Res. No. 24-9316 Full Cost: 48.47$
Traffic Flow Map - not mailed 23.00$ No Unchanged - Refer to each Collected by: Full Cost: 24.24$ Current Fee Finance
Storage or Refuse Bins on City Street 162.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 167.00$ 3.1% Engineering /
Traffic Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 290.84$
Finance
Temporary Sanitary Sewer Discharge 1,469.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 1,520.00$ 3.5% Engineering /
Traffic Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 1,520.42$
Finance
Building Permit Site Clearance Fee Charged by: Date 4/23/2024 Objective: Recover Cost Engineering / Prop 26 Exception: 1, 2
A) Minor 140.00$ Yes LPD Res. No. 24-9316 Full Cost: 145.42$ 144.00$ 2.9% B) Major 280.00$ Yes Collected by: Full Cost: 290.84$ 289.00$ 3.2% Finance
Subdivision Committee Review: 1,678.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 1,736.00$ 3.5% Tentative Map (4 or fewer lots) Engineering /
LPD Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 1,737.25$
Finance
Reference: CMD 109 14 - 13
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Subdivision Committee Review: 2,631.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 2,723.00$ 3.5% Tentative Map (5 or more lots) Engineering /
LPD Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 2,723.09$
Finance
Subdivision Committee Review: 761.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 787.00$ 3.4% Lot Line Adjustment Engineering /
LPD Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 787.64$
Finance
Project Clearance Committee Review: 944.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 977.00$ 3.5% Preliminary application / Re-Zoning / Engineering /
Architect Review LPD Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by: Full Cost: 977.04$
Finance
Project Clearance Committee Review: 460.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 476.00$ 3.5% Use Permit / Variance Engineering /
LPD Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 476.62$
Finance
Project Clearance Committee Review: 2,885.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 2,985.00$ 3.5% CEQA - Initial Study Review Engineering /
LPD Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 2,985.98$
Finance
Reference: CMD 109 14 - 14
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Project Clearance Committee Review: 4,783.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 4,950.00$ 3.5% CEQA - EIR Review Engineering /
LPD Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 4,950.41$
Finance
Project Clearance Committee Review: 2,916.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 3,018.00$ 3.5% Traffic Study Report Review Engineering /
(without EIR) LPD Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by: Full Cost: 3,018.58$
Finance
Cost Analysis for Development - CAD - 458.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 474.00$ 3.5% Minor (accessory dwelling unit, single Engineering /
family home, and up to 4 residential units) LPD Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by: Full Cost: 474.81$
Finance
Cost Analysis for Development - CAD - 1,120.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 1,159.00$ 3.5% Major Engineering /
LPD Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by: Full Cost: 1,159.46$
Finance
Reference: CMD 109 14 - 15
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Shared Mobility Permit and Impound Fees Charged by: Date 4/23/2024 Objective: Recover Cost Engineering Prop 26 Exception: 2
1) Application Fee (per Operator) 3,762.00$ Yes Res. No. 24-9316 Full Cost: 3,893.86$ Adjust using general COL 3,893.00$ 3.5% Collected by:
2) Annual Fee (per Operator) 29,747.00$ Yes Finance Full Cost: 30,788.22$ Adjust using general COL 30,788.00$ 3.5% 3) Per Device Fee (excluding the first 60 75.00$ Yes Full Cost: 78.33$ Adjust using general COL 77.00$ 2.7% Devices)
4) Per Additional Fee (for authorized 37.00$ Yes Full Cost: 38.63$ Adjust using general COL 38.00$ 2.7% increases to the original number of
permitted devices)
5) Impound Fee (per device) 330.00$ Yes Full Cost: 342.13$ Adjust using general COL 341.00$ 3.3% Reference: CMD 109 14 - 16

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION

JUSTIFICATION FOR INCREASE IN FEES, RATES, AND CHARGES
NOTE 1: Fees, rates, and charges to recover costs for these types of fees/reimbursements for public improvements are proposed to decrease 0.3% from 2024/25 fees, rates, and charges, consistent with the percentage change in the Construction Cost Index (January 2024 to January 2025) as published by the Engineering News-Record.

NOTE 2: Fees, rates, and charges to recover costs for Field Marking – Traffic Signal Engineering Services is equal to the Field Marking – Fiber which services are performed by the same Silicon Valley Power (SVP) field staff.

NOTE 3: City is required to charge a pro-rated sanitary sewer conveyance fee for accessory dwelling units per City Ordinance 1968. An accessory dwelling unit is equivalent to an apartment and will be charged a sanitary sewer conveyance fee equivalent to 62.9% of the sanitary sewer conveyance fee for a single-family home. This 62.9% is based on the ratio of an apartment daily average discharge of 154 gallons per day (gpd) over a single-family home daily average discharge of 245 gpd (154 gpd/245 gpd = 0.629).
14 - 17
Department / Division: Public Works / Street / Storm Drain Division Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

1. Active construction site inspections 646.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost MRP requires inspection of 668.00$ 3.4% of projects over one (1) acre in size Storm Drain sites once a month during wet and high priority sites during wet Res. No. 24-9316 Prop 26 Exception: 1, 2 season. 7 inspections per year season (Oct. - Apr.) as required by Collected by: required if permit is open Provision C.6 of MRP Storm Drain & Full Cost: 669.24$ during wet season, plus Finance reinspections as needed.

2. Industrial / commercial facility 744.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Inspection frequency of 770.00$ 3.5% stormwater inspections as required Storm Drain businesses that have filed a by Provision C.4 of MRP (Tier 1) Res. No. 24-9316 Prop 26 Exception: 1, 2 Notice of Intent (NOI) is once Collected by: per year as required by the
Storm Drain & Full Cost: 770.50$ Municipal Regional Finance Stormwater NPDES Permit.

3. Industrial / commercial facility 499.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Businesses that received a 516.00$ 3.4% stormwater inspections as required Storm Drain Notice of Violation during an by Provision C.4 of MRP (Tier 2) Res. No. 24-9316 Prop 26 Exception: 1, 2 industrial / commercial Collected by: stormwater inspection the
Storm Drain & Full Cost: 517.36$ previous year are required to Finance be inspected the following year.

4. Operation & maintenance inspection Charged by: Date 4/23/2024 Objective: Recover Cost Operation & maintenance of stormwater treatment systems Storm Drain inspections required on an installed on projects as required Res. No. 24-9316 Prop 26 Exception: 1, 2 annual basis to ensure the by Provision C.3 of MRP Collected by: stormwater treatment systems Storm Drain & are properly maintained.

Tier 1: 1 - 25 Treatment Measures 891.00$ Yes Finance Full Cost: 922.38$ 922.00$ 3.5% Tier 2: 26 - 50 Treatment Measures 1,086.00$ Yes Full Cost: 1,124.90$ 1,124.00$ 3.5% Tier 3: 50+ Treatment Measures 1,282.00$ Yes Full Cost: 1,327.42$ 1,326.00$ 3.4%

5. Operation & Maintenance Agreement 860.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 890.00$ 3.5% Administration of permanent Storm Drain
stormwater treatment systems Res. No. 24-9316 Prop 26 Exception: 1, 2 installed on projects as required by Collected by:

Provision C.3 of MRP Storm Drain & Full Cost: 890.10$
Finance

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 15 - 1
Department / Division: Public Works / Street / Storm Drain Division Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

6. Stormwater Management Planning 3,510.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 3,632.00$ 3.5% Application Plan review as required Engineering /
by Provision C.3 of MRP LPD Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by: Full Cost: 3,632.85$
Planning

7. Stormwater Management Building 3,510.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 3,632.00$ 3.5% Application Improvement plans review Storm Drain
for stormwater management Res. No. 24-9316 Prop 26 Exception: 1, 2 compliance with Provision C.3 of MRP Collected by:

Building Full Cost: 3,632.85$

8. Private Land Drainage Area (PLDA) 707.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 731.00$ 3.4% Program Inspection Fee Storm Drain
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 731.75$

9. Storm Drain Medallion Fee 26.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Unchanged - Refer to Storm Drain Current Fee
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Building Full Cost: 27.00$

10. Building Demolition Polychlorinated 647.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 669.00$ 3.4% biphenyls (PCBs) Inspection Fee Storm Drain
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 670.02$
Reference: CMD 109 15 - 2
Department / Division: Public Works / Street / Street Maintenance Division Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Pavement Restoration Charge Up to Charged by: Date 4/23/2024 Objective: Recover Cost Pavement restoration charges 3" Thick Asphalt Engineering are applied on work associated Street Res. No. 24-9316 Prop 26 Exception: 1, 2 with utility street opening

1. First 80 cubic feet 4,306.00$ Yes Collected by: encroachment permits 4,456.00$ 3.5% up to 80 sq. ft. Engineering & Full Cost: 4,456.97$ associated with repair of up to 80 sq. ft.

Street & existing City infrastructure, not

2. Each additional cubic foot 41.00$ Yes Finance utility trench work consisting 42.00$ 2.4% per sq. ft. of installation of new main and per sq. ft. lateral lines.

Engineering Plan Review per sheet Charged by: Date 4/23/2024 Objective: Recover Cost Fee is applicable to trench (Streets) Engineering repairs for City utilities street Res. No. 24-9316 Prop 26 Exception: 1, 2 opening permits.

1. First three (3) reviews 177.00$ Yes Collected by: 183.00$ 3.4% Engineering & Full Cost: 183.97$

2. Fourth and Each subsequent review 39.00$ Yes Finance 40.00$ 2.6% Concrete Removal / Replace Charge - Charged by: Date 4/23/2024 Objective: Recover Cost Fee is applicable to trench Curb / Gutter Engineering repairs for City utilities street Street Res. No. 24-9316 Prop 26 Exception: 1, 2 opening permits.

1. Base (administrative costs) 618.00$ Yes Collected by: 639.00$ 3.4% Engineering & Full Cost: 639.63$

2. Per linear ft. 73.00$ Yes Street & 75.00$ 2.7% Finance
Concrete Removal / Replace Charge - Charged by: Date 4/23/2024 Objective: Recover Cost Fee is applicable to trench Sidewalk Engineering repairs for City utilities street
Street Res. No. 24-9316 Prop 26 Exception: 1, 2 opening permits.

1. Base (administrative costs) 618.00$ Yes Collected by: 639.00$ 3.4% Engineering & Full Cost: 639.63$

2. Per square ft. 19.00$ Yes Street & Unchanged - Refer to Finance Current Fee
Traffic Sign Fabrication 954.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Fee is for traffic sign 987.00$ 3.5% Engineering fabrication.

Street Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Engineering & Full Cost: 987.39$
Street &
Finance

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 15 - 3
Department / Division: Public Works / Street / Parkways & Boulevards Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Street Tree Removal 1,016.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Contract Costs: 1,051.00$ 3.4% per tree Parkways & 1-3" dbh: $55 per tree
Boulevards Res. No. 24-9316 Prop 26 Exception: 1, 2 4-6" dbh: $110 Plus contract cost to 7-12" dbh: $237 Plus contract cost to remove tree & stump as Collected by: Full Cost: 1,051.56$ 13-24" dbh: $1,067 remove tree & stump as specified in the Finance 25-36" dbh: $1,784 specified in the Comments Section are 37-48" dbh: $2,703 Comments Section are added to the Fee. 49" and above dbh: $2,163 added to the Fee.

City Tree Planting 2,011.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Includes tractor, auger, 2,081.00$ 3.5% Includes in-lieu tree planting for per tree Engineering fertilizer, compost & stakes per tree private development tree removals Res. No. 24-9316 Prop 26 Exception: 1, 2, 6 and 24" box tree with root Collected by: barrier.

Finance Full Cost: 2,081.39$
Parkways and Boulevards Plan Review 585.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost 605.00$ 3.4% Engineering
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 605.48$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 15 - 4
Department / Division: Public Works / Street / Solid Waste Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Non-exclusive franchise hauler 1,470.00$ No Charged by: Date 4/23/2024 Objective: User Fee Haulers that want to charge for 1,521.00$ 3.5% application fee Solid Waste solid waste collection services Res. No. 24-9316 Prop 26 Exception: 2 at properties zoned for Collected by: Industrial use have agreements
Solid Waste & Full Cost: 1,521.45$ approved by Council at a Finance Public Hearing.

Solid Waste Management Planning 1,850.00$
Yes Charged by: Date 4/23/2024 Objective: Recover Cost 1,914.00$

3.5%
Application Plan review as required by Solid Waste
City Municipal Code Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by:

Planning Full Cost: 1,914.75$
Solid Waste Management Buliding Permit 1,850.00$
Yes Charged by: Date 4/23/2024 Objective: Recover Cost 1,914.00$

3.5%
Application Improvement plans review Solid Waste
for solid waste management compliance Res. No. 24-9316 Prop 26 Exception: 1, 2 with City's municipal codes Collected by:

Building Full Cost: 1,914.75$
Construction & Demolition (C&D) waste 497.00
$
Yes Charged by: Date 4/23/2024 Objective: Recover Cost 514.00$

3.4%
management: Processing solid waste Solid Waste
management and Green Halo Res. No. 24-9316 Prop 26 Exception: 1, 2 reconciliation Collected by:

Building Full Cost: 514.91$
Cleanup Campaign Debris Bag Fee 35.00
$
Yes Charged by: Date 4/23/2024 Objective: Recover Cost 36.00$

2.9%
Solid Waste
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 36.43$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 15 - 5

Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
New 1" water service 23,171.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 23,981.00$ 3.5% Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 23,982.96$ included.

New 1" water service and abandon 28,742.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 29,747.00$ 3.5% existing service SFR Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 29,748.46$ included.

New 2" water service 26,041.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 26,952.00$ 3.5% Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 26,953.41$ included.

New 3" water service 53,168.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 55,028.00$ 3.5% Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 55,029.23$ included.

New 4" water service 56,682.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 58,665.00$ 3.5% Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 58,666.20$ included.

New 6" water service 56,988.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 58,982.00$ 3.5% Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 58,982.64$ included.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 16 - 1
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
New 8" water service 58,372.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 60,415.00$ 3.5% Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 60,415.29$ included.

New 4" water service (Dual Meter 62,388.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 64,571.00$ 3.5% Service) Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 64,571.67$ included.

New 6" water service (Dual Meter 64,291.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 66,541.00$ 3.5% Service) Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 66,541.70$ included.

New 8" water service (Dual Meter 68,857.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, 71,266.00$ 3.5% Service) Water backflows, Encroachment
Res. No. 24-9316 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 71,267.70$ included.

New 1" Water Meter - Device Cost Only 225.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 232.00$ 3.1% Water
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Engineering Full Cost: 233.60$
New 1" water meter and backflow 628.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes cost of meter and RP 649.00$ 3.3% preventer - device cost only Water backflow prevention device.

Res. No. 24-9316 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 650.16$ based on the discretion of the Water & Sewer Utilities.

Reference: CMD 109 16 - 2
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
New 1½" water meter and backflow 1,719.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes cost of meter and RP 1,779.00$ 3.5% preventer - device cost only Water backflow prevention device.

Res. No. 24-9316 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 1,780.16$ based on the discretion of the Water & Sewer Utilities.

New 2" water meter and backflow 2,077.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes cost of meter and RP 2,149.00$ 3.5% preventer - device cost only Water backflow prevention device.

Res. No. 24-9316 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 2,150.69$ based on the discretion of the Water & Sewer Utilities.

New 3" water meter and backflow 5,244.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes cost of meter and RP 5,427.00$ 3.5% preventer - device cost only Water backflow prevention device.

Res. No. 24-9316 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 5,427.93$ based on the discretion of the Water & Sewer Utilities.

New 4" water meter and backflow 6,923.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes cost of meter and RP 7,165.00$ 3.5% preventer - device cost only Water backflow prevention device.

Res. No. 24-9316 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 7,165.51$ based on the discretion of the Water & Sewer Utilities.

New 6" water meter and backflow 14,381.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes cost of meter and RP 14,884.00$ 3.5% preventer - device cost only Water backflow prevention device.

Res. No. 24-9316 Prop 26 Exception: 2 Fees for the meter or backflow Collected by:
can be assessed separately
Engineering Full Cost: 14,884.52$ based on the discretion of the Water & Sewer Utilities.

Reference: CMD 109 16 - 3
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
New 8" water meter and backflow 19,975.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes cost of meter and RP 20,674.00$ 3.5% preventer - device cost only Water backflow prevention device.

Res. No. 24-9316 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 20,674.93$ based on the discretion of the Water & Sewer Utilities.

New Fire Hydrant 43,750.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost For hydrant requested by 45,281.00$ 3.5% Water property owner / developer.

Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Engineering Full Cost: 45,281.33$
New Fire Service
Charged by: Date 4/23/2024 Objective: Recover Cost Cost for DCDA, RPDA, (Installation of fire service line) Water Prop 26 Exception: 2 Encroachment Permit, Soil Res. No. 24-9316 Disposal, and Pavement
2" fire service 24,197.00$ No Collected by: Full Cost: 25,044.75$ Restoration not included. 25,043.00$ 3.5% Engineering
4" fire service 55,881.00$ No Full Cost: 57,837.68$ 57,836.00$ 3.5% 6" fire service 56,604.00$ No Full Cost: 58,585.65$ 58,585.00$ 3.5% 8" fire service 57,592.00$ No Full Cost: 59,608.63$ 59,607.00$ 3.5% 10" fire service 60,204.00$ No Full Cost: 62,311.67$ 62,311.00$ 3.5% Fire Service Upgrade Charged by: Date 4/23/2024 Objective: Recover Cost Cost for DCDA, RPDA, or (Upgrade device to standard DCDA Water Prop 26 Exception: 2 Encroachment Permit not or RPDA) Res. No. 24-9316 included.
2" fire service 11,137.00$ No Collected by: Full Cost: 11,526.90$ 11,526.00$ 3.5% Engineering
4" fire service 22,703.00$ No Full Cost: 23,498.03$ 23,497.00$ 3.5% 6" fire service 22,889.00$ No Full Cost: 23,690.20$ 23,690.00$ 3.5% 8" fire service 23,106.00$ No Full Cost: 23,915.75$ 23,914.00$ 3.5% 10" fire service 24,046.00$ No Full Cost: 24,888.10$ 24,887.00$ 3.5% Reference: CMD 109 16 - 4
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Backflow Preventer - device cost only Charged by: Date 4/23/2024 Objective: Recover Cost Water Prop 26 Exception: 2
2" DCDA 1,077.00$ No Res. No. 24-9316 Full Cost: 1,115.05$ 1,114.00$ 3.4% Collected by:
4" DCDA 3,382.00$ No Engineering Full Cost: 3,500.48$ 3,500.00$ 3.5% 6" DCDA 5,057.00$ No Full Cost: 5,234.61$ 5,233.00$ 3.5% 8" DCDA 9,408.00$ No Full Cost: 9,737.36$ 9,737.00$ 3.5% 10" DCDA 13,533.00$ No Full Cost: 14,007.68$ 14,006.00$ 3.5% Charged by: Date 45405 Objective: Recover Cost
Water Prop 26 Exception: 2
2" RPDA 1,077.00$ No Res. No. 24-9316 Full Cost: 1,115.05$ 1,114.00$ 3.4% Collected by:
4" RPDA 4,635.00$ No Engineering Full Cost: 4,797.34$ 4,797.00$ 3.5% 6" RPDA 7,257.00$ No Full Cost: 7,511.87$ 7,510.00$ 3.5% 8" RPDA 13,819.00$ No Full Cost: 14,303.41$ 14,302.00$ 3.5% 10" RPDA 18,232.00$ No Full Cost: 18,870.61$ 18,870.00$ 3.5% Field Fire Hydrant Flow Test 2,064.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 2,136.00$ 3.5% Water
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Finance / Full Cost: 2,136.92$
Municipal Serv.

Portable hydrant meter and Deposit 3,896.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Deposit to ensure return of 4,032.00$ 3.5% (Includes cost of RP backflow) Water meter, or cover replacement if Res. No. 24-9316 Prop 26 Exception: 1, 2 lost or damaged. $655 of the Collected by: deposit is non-refundable.

Finance / Full Cost: 4,033.23$
Municipal Serv.

Reference: CMD 109 16 - 5
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Recycled hydrant meter and Deposit 3,896.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Deposit to ensure return of 4,032.00$ 3.5% (Includes cost of RP backflow) Water meter, or cover replacement if Res. No. 24-9316 Prop 26 Exception: 1, 2 lost or damaged. $655 of the Collected by: deposit is non-refundable.

Finance / Full Cost: 4,033.23$
Municipal Serv.

Water Meter Test 500.00$ No Charged by: Date 4/18/2023 Objective: Recover Cost Non-routine testing of water 517.00$ 3.4% Water meter when customer questions
Res. No. 23-9221 Prop 26 Exception: 1, 2 meter accuracy. Refundable if Collected by: meter falls outside accepted
Finance / Full Cost: 939.26$ range.

Municipal Serv.

Utility Engineering Plan Review Charged by: Date 4/23/2024 Objective: Recover Cost Water Prop 26 Exception: 3
Utility Engineering Plan Check for SFH 664.00$ No Res. No. 24-9316 Full Cost: 688.19$ 687.00$ 3.5% Remodel (per plan set) - includes 3 checks Collected by:

Engineering
Utility Engineering Plan Check for Projects up 1,179.00$ No Full Cost: 1,220.70$ Includes all projects with dry 1,220.00$ 3.5% to $25K (per plan set) - includes 3 checks utility installation.

Utility Engineering Plan Check for Projects 2,850.00$ No Full Cost: 2,950.70$ Includes all projects with dry 2,949.00$ 3.5% over $25K (per sheet) - includes 3 checks utility installation.

Utility Engineering Plan Check (per plan set 721.00$ No Full Cost: 747.19$ Includes all projects with dry 746.00$ 3.5% for Projects up to $25K and per sheet for utility installation.

Projects over $25K) - 4th and subsequent
review
Reference: CMD 109 16 - 6
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Utility Engineering Inspection * Charged by: Date 4/23/2024 Objective: Recover Cost * Use this fee for all SFH Water Prop 26 Exception: 3 remodels
$0 - $15K 627.00$ No Res. No. 24-9316 Full Cost: 649.46$ 648.00$ 3.3% Collected by:
$15,001-$25K-base + 13.73% of cost 1,255.00$ No Engineering Full Cost: 1,298.93$ 1,298.00$ 3.4% above $15K
$25,001-$50K-base + 11.87% of cost 2,752.00$ No Full Cost: 2,848.32$ 2,848.00$ 3.5% above $25K
$50,001-$100K-base + 2.22% of cost 5,988.00$ No Full Cost: 6,197.58$ 6,197.00$ 3.5% above $50K
$101K-$200K-base + 4.22% of cost 7,198.00$ No Full Cost: 7,449.93$ 7,449.00$ 3.5% above $100K
$201K-$500K-base + 3.03% of cost 11,796.00$ No Full Cost: 12,208.86$ 12,208.00$ 3.5% above $200K
$501K-$1M-base + 0.67% of cost above 21,718.00$ No Full Cost: 22,478.13$ 22,478.00$ 3.5% $500K
>$1M; base 25,348.00$ No Full Cost: 26,235.18$ 26,235.00$ 3.5% >$1M for each add'l $500K or fraction 7,803.00$ No Full Cost: 8,076.11$ 8,076.00$ 3.5% thereof
Water Efficiency Review 244.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 252.00$ 3.3% Water
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 252.54$
Water Supply Assessment Preparation 14,900.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Water Supply Assessment 15,421.00$ 3.5% Water Prop 26 Exception: 6 prepartaion services rendered Supplemental Assessment Preparation 9,536.00$ No Res. No. 24-9316 by the Water Utility. 9,869.00$ 3.5% Collected by: Full Cost: 15,421.50$
Finance Required due to changes in
Full Cost: 9,869.76$ project.

Reference: CMD 109 16 - 7
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Water reconnection fee - standard 268.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 277.00$ 3.4% service reconnection per account Water Penalty per account Res. No. 24-9316 Prop 26 Exception: 1, 2, 5
Water meter replacement / reconnection 488.00$ No Collected by: 505.00$ 3.5% fee due to meter tampering / illegal access per account Finance / Full Cost: 430.54$ per account Municipal Serv.

Fee to fix meter plus Full Cost: 680.45$ Fee to fix meter plus two (2) times the two (2) times the
estimated cost of estimated cost of
services used services used
Water service abandonment (2" and smaller) 10,236.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of Encroachment 10,594.00$ 3.5% Water Permit, Soil Disposal, and
Res. No. 24-9316 Prop 26 Exception: 1, 2 Pavement Restoration not Collected by: included.

Finance Full Cost: 10,594.30$
Water service abandonment (3" and larger) 21,881.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of Encroachment 22,646.00$ 3.5% Water Permit, Soil Disposal, and
Res. No. 24-9316 Prop 26 Exception: 1, 2 Pavement Restoration not Collected by: included.

Finance Full Cost: 22,647.24$
Water service relocation 7,828.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost For service relocation of no 8,101.00$ 3.5% Water more than 4 feet from the
Res. No. 24-9316 Prop 26 Exception: 1, 2 existing location.

Collected by: Note: The cost of Encroachment
Finance Full Cost: 8,101.98$ Permit, Soil Disposal, and Pavement Restoration not
included.

Field Marking - Water Charged by: Date 4/23/2024 Objective: Recover Cost Water Prop 26 Exception: 2
Up to 50 ft. of excavation 297.00$ No Res. No. 24-9316 Full Cost: 308.17$ 307.00$ 3.4% Collected by:

Over 50 ft. - each additional 50 ft. or 121.00$ No Finance Full Cost: 125.24$ 125.00$ 3.3% fraction thereof of excavation
Reference: CMD 109 16 - 8
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Field Marking - Recycled Water Charged by: Date 4/23/2024 Objective: Recover Cost Water Prop 26 Exception: 2
Up to 50 ft. of excavation 297.00$ No Res. No. 24-9316 Full Cost: 308.17$ 307.00$ 3.4% Collected by:

Over 50 ft. - each additional 50 ft. or 121.00$ No Finance Full Cost: 125.24$ 125.00$ 3.3% fraction thereof of excavation
Water and Fire Service Tap (2" and smaller) 1,161.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes installation and 1,201.00$ 3.4% Water inspection of water main tap
Res. No. 24-9316 Prop 26 Exception: 2 only.

Collected by:

Finance Full Cost: 1,202.47$
Water and Fire Service Tap (4", 6", and 8") 1,300.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes installation and 1,345.00$ 3.5% Water inspection of water main tap
Res. No. 24-9316 Prop 26 Exception: 2 only.

Collected by:

Finance Full Cost: 1,346.32$
Water and Fire Service Tap (10" and 12") 1,745.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Includes installation and 1,806.00$ 3.5% Water inspection of water main tap
Res. No. 24-9316 Prop 26 Exception: 2 only.

Collected by:

Finance Full Cost: 1,806.60$
Reference: CMD 109 16 - 9
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Insertion Valve Installation Charged by: Date 4/23/2024 Objective: Recover Cost Includes installation and Water Prop 26 Exception: 2 inspection of valve only.
4" Valve 16,051.00$ No Res. No. 24-9316 Full Cost: 16,613.76$ 16,612.00$ 3.5% Collected by:
6" Valve 16,938.00$ No Engineering Full Cost: 17,530.87$ 17,530.00$ 3.5% 8" Valve 17,714.00$ No Full Cost: 18,334.07$ 18,333.00$ 3.5% 10" Valve 21,190.00$ No Full Cost: 21,932.36$ 21,931.00$ 3.5% 12" Valve 22,902.00$ No Full Cost: 23,704.47$ 23,703.00$ 3.5% Insertion Valve Installation Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of Encroachment Water Prop 26 Exception: 2 Permit, Soil Disposal, and
4" Valve (excavation included) 27,991.00$ No Res. No. 24-9316 Full Cost: 28,971.39$ Pavement Restoration not 28,970.00$ 3.5% Collected by: included.
6" Valve (excavation included) 28,877.00$ No Engineering Full Cost: 29,888.51$ 29,887.00$ 3.5% 8" Valve (excavation included) 29,653.00$ No Full Cost: 30,691.71$ 30,690.00$ 3.5% 10" Valve (excavation included) 33,130.00$ No Full Cost: 34,290.01$ 34,289.00$ 3.5% 12" Valve (excavation included) 34,842.00$ No Full Cost: 36,062.11$ 36,061.00$ 3.5% Project Clearance Committee - Utility 1,390.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 1,438.00$ 3.5% Engineering / Subcommittee Review Water
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 1,439.17$
Hold Harmless Agreement 1,040.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 1,076.00$ 3.5% Water
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 1,076.40$
Fire Flow (Hydraulic Model) Charged by: Date 4/23/2024 Objective: Recover Cost Water Prop 26 Exception: 2
Single Family Homes (SFH) 1,056.00$ No Res. No. 24-9316 Full Cost: 959.00$ 959.00$ -9.2% Collected by:

Others, Excluding SFH 2,364.00$ No Finance Full Cost: 1,404.00$ 1,404.00$ -40.6% Reference: CMD 109 16 - 10
Department / Division: Water & Sewer Utilities / Water Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Development Impact Analysis 3,094.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost This is a hydraulic modeling fee 2,139.00$ -30.9% Water for new development.

Res. No. 24-9316 Prop 26 Exception: 6
Collected by:

Finance Full Cost: 2,139.00$
Water Service Upgrade of Existing Service Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of meters, excluding Device Cost Water Prop 26 Exception: 2 backflows, Encroachment Res. No. 24-9316 Permit, Soil Disposal, and
5/8" x 3/4" water services and backflow 11,098.00$ No Collected by: Full Cost: 11,486.62$ Pavement Restoration not 11,486.00$ 3.5% preventer Engineering included.
1" water service and backflow preventer 11,098.00$ No Full Cost: 11,486.62$ 11,486.00$ 3.5% 1-1/2" water service and backflow preventer 11,135.00$ No Full Cost: 11,525.74$ 11,524.00$ 3.5% 2" water service and backflow preventer 11,135.00$ No Full Cost: 11,525.74$ 11,524.00$ 3.5% 3" water service and backflow preventer 11,508.00$ No Full Cost: 11,911.24$ 11,910.00$ 3.5% Reference: CMD 109 16 - 11
Department / Division: Water & Sewer Utilities / Sewer Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Sewer lateral cleanout 2,423.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost When no cleanout exists, it 2,507.00$ 3.5% 4 inch lateral Sewer is necessary that one be
Res. No. 24-9316 Prop 26 Exception: 1, 2 installed in order for City to Collected by: have access to sewer lateral
Finance Full Cost: 11,641.39$ for courtesy maintenance.

Cleanout box is included.

Sewer lateral cleanout 11,429.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost When no cleanout exists, it 11,829.00$ 3.5% 6 inch lateral or larger Sewer is necessary that one be Res. No. 24-9316 Prop 26 Exception: 1, 2 installed in order for City to Collected by: have access to sewer lateral
Finance Full Cost: 11,829.87$ for courtesy maintenance.

Cleanout box is included.

Cleanout box only 378.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost 391.00$ 3.4% Sewer
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 1,069.58$
4" sewer lateral installation 44,123.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of Encroachment 45,667.00$ 3.5% Sewer Permit, Soil Disposal, and
Res. No. 24-9316 Prop 26 Exception: 2 Pavement Restoration not Collected by: included.

Engineering Full Cost: 45,667.51$ No cleanout or box cost included.
6" sewer lateral installation 44,123.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of Encroachment 45,667.00$ 3.5% Sewer Permit, Soil Disposal, and
Res. No. 24-9316 Prop 26 Exception: 2 Pavement Restoration not Collected by: included.

Engineering Full Cost: 45,667.51$ No cleanout or box cost included.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 16 - 12
Department / Division: Water & Sewer Utilities / Sewer Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
8" sewer lateral installation 44,123.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Note: The cost of Encroachment 45,667.00$ 3.5% Sewer Permit, Soil Disposal, and
Res. No. 24-9316 Prop 26 Exception: 2 Pavement Restoration not Collected by: included.

Engineering Full Cost: 45,667.51$ No cleanout or box cost included.

Sewer Lateral Video Inspection 508.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Video inspection of existing 525.00$ 3.3% Sewer lateral to determine that its
Res. No. 24-9316 Prop 26 Exception: 2 replacement is not required Collected by: as a condition of
Finance Full Cost: 1,037.07$ redevelopment.

Encroachment Permit: Charged By: Date 4/23/2024 Objective: Recover Cost See Article 2 of Chapter 3.1 Field Marking - Sanitary Sewer Engineering / of Div. 5 of Title 1 of the LPD Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 Government Code.

Up to 50 ft. of excavation 297.00$ No Full Cost: 308.17$ 307.00$ 3.4% Collected By:

Over 50 ft. - each additional 50 ft. or 297.00$ No Finance Full Cost: 308.17$ 307.00$ 3.4% fraction thereof of excavation plus plus
121.00$ No Full Cost: 125.24$ 125.00$ 3.3% each add'l 50 ft or each add'l 50 ft or
fraction thereof fraction thereof
Fats, Oil and Grease (FOG) Charged By: Date 4/23/2024 Objective: Recover Cost For new building permit Building Division applicants
FOG Plan Review and Inspection Fee 2,724.00$ No Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 2,819.00$ 3.5% (Building Permits) Collected By: Combine plan review and Building Division Full Cost: 2,819.34$ permit into one fee Short Term Wastewater Discharge Permit 460.00$ No Charged By: Date 4/23/2024 Objective: Recover Cost Use per HCF / per 1,000 gal 476.00$ 3.5% + ($5.29 / HCF Engineering / of discharge and a $460 + ($5.29 / HCF or $7.07 / 1,000 gal) LPD Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 processing fee. or $7.07 / 1,000 gal) Collected By: Full Cost: 476.10$
Finance
Reference: CMD 109 16 - 13
Department / Division: Water & Sewer Utilities / Sewer Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Wastewater Treatment Plant Capacity Fee Charged By: Date 8/22/2017 Objective: Recover Cost Accessory Dwelling Unit Engineering / Charge per City Ordinance
Residential Dwelling Unit 1,187.00$ No LPD Ord. No. 1968 Prop 26 Exception: 2 1968 passed by Council on Unchanged - Refer to per dwelling unit 8/22/2017. Current Fee
Collected By: Full Cost: 2,464.28$
Accessory Dwelling Unit 747.00$ No Finance Unchanged - Refer to per accessory Current Fee
dwelling unit
Wastewater Treatment Plant Capacity Fee Charged By: Date 4/18/2017 Objective: Recover Cost Engineering /
Non-Residential 4.47$ No LPD Ord. No. Prop 26 Exception: 6 Unchanged - Refer to per gallon, per day Current Fee
Collected By: Full Cost: 10.52$
Finance
Reference: CMD 109 16 - 14
Department / Division: Water & Sewer Utilities / Solar Resolution: Date Approved:

Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments Proposed New Fee
Percent
Change
Solar pool heating system 5,324.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Costs are recovered through 5,510.00$ 3.5% Installation Fee plus Water / Solar Prop 26 Exception: N/A the combination of installation plus Res. No. 24-9316 fees and monthly service
309.00$ Collected by: Full Cost: 17,338.32$ charges, and recoverable 319.00$ 3.2% per panel Finance system components. per panel
Full Cost: 1,083.65$
Solar domestic hot water system Actual Cost No Charged by: Date 6/9/2009 Objective: Recover Cost Costs are recovered through Unchanged - Refer to installation fee Water / Solar the combination of installation Current Fee Single-family fee Res. No. Prop 26 Exception: N/A fees and monthly service Collected by: charges, and recoverable
Finance Full Cost: Actual Cost system components.

Solar domestic hot water system Actual Cost No Charged by: Date 3/14/1985 Objective: Recover Cost Installation fees based on cost Unchanged - Refer to installation fee Water / Solar of labor and permanently- Current Fee Multi-family fee Res. No. Prop 26 Exception: N/A installed materials. Example Collected by: for system to serve 10
Finance Full Cost: Actual Cost dwelling units. Remaining costs recovered by monthly
service charges.

Solar domestic hot water system panel 623.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Costs are recovered through 644.00$ 3.4% removal and replacement fee per panel Water / Solar the combination of installation per panel Res. No. 24-9316 Prop 26 Exception: N/A fees and monthly service Collected by: charges, and recoverable
Finance Full Cost: 3,891.60$ system components.

Solar pool heating system panel removal 378.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Costs are recovered through 391.00$ 3.4% and replacement fee per panel
Water / Solar the combination of installation per panel Res. No. 24-9316 Prop 26 Exception: N/A fees and monthly service Collected by: charges, and recoverable
Finance Full Cost: 3,891.60$ system components.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 16 - 15

Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
10-Day Letter for House Meter Finance 8 - 3
Aboveground Petroleum Storage Tank Program Fire 9 - 40
Access Control and Traffic Calming Fire 9 - 13
Access Controlled Egress Fire 9 - 17
Active Construction Site Inspections of Projects Public Works 15 - 1 Additional Temporary Tent, Canopy or Air Supported Structure Fire 9 - 15 Addressing Community Development 4 - 14
Administrative Citations Fire 9 - 35
Affordable Housing Application Community Development 5 - 2 Affordable Housing Application (BMP) Community Development 5 - 4 AHA Affordable Housing Agreement Community Development 5 - 2 Alarm Permit Police 13 - 1
Alternate Materials and Methods Review (per hour) Community Development 4 - 13 Alternate Materials and Methods Review Fire 9 - 4
Ambulance Transport Fees Fire 9 - 43
Amended Final Map Checking Public Works 14 - 1
Amended Parcel Map and Record of Survey Checking Public Works 14 - 1 Amplified Music Permit Parks and Recreation 12 - 5
Amplified Music Permit Finance 8 - 2
Animal Control - Adoption Police 13 - 12
Animal Control - Animal Surrender Police 13 - 12
Animal Control - License Police 13 - 10
Animal Control - Other Fees Police 13 - 13
Animal Control - Shelter Services Police 13 - 11
Animal Control - Trap Police 13 - 13
Annexation of Territory to City of Santa Clara Community Development 6 - 4 Appeals Community Development 6 - 3
Application Extension Community Development 4 - 14
Architectural Review Community Development 6 - 4
Assessment District Reapportionment Public Works 14 - 2 Automatic Fire Extinguishing Systems Fire 9 - 4
17 - 1
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Automatic Fire Protection System for Spray Booths Fire 9 - 16 Automatic Fire Sprinkler Systems - Existing Fire 9 - 5
Automatic Fire Sprinkler Systems - New Fire 9 - 4
Automatic Fire Sprinkler Systems - Residential 13D Fire 9 - 15 Backflow Preventer - Device Cost Only Water and Sewer Utilities 16 - 5 Backflow Preventer Replacement Fire 9 - 11
Bathroom Remodel Community Development 4 - 15
Below Market Purchase Processing and Transaction Fee Community Development 5 - 4 Billing Service Charge for Late Payment Finance 8 - 2
Bingo Organization Police 13 - 1
Black Line Print of Plans on File Public Works 14 - 5
Block Party Request Finance 8 - 2
Borrowing Materials from Other Libraries (Interlibrary Loan) Library 10 - 1 Building Conformance Fee Community Development 4 - 2
Building Demolition Polychlorinated biphenyls (PCBs) Inspection Public Works 15 - 2 Building Permit Site Clearance Public Works 14 - 13
Building Plans Fire 9 - 6
Burial Materials Processing Parks and Recreation 11 - 11 Burial Permit Filing Parks and Recreation 11 - 6
Business Certificate Information Finance 8 - 1
Business Tax Certificate Finance 8 - 1
Business Tax Rental Unit Surcharge Finance 8 - 1
CAD Report for Legal Purposes Police 13 - 1
California Accidental Release Program (CALARP) Fire 9 - 38 Carbon Dioxide Beverage Dispensing System Fire 9 - 18
Carnivals and Fairs Fire 9 - 6
Casket Parks and Recreation 11 - 2
Casket Burial Parks and Recreation 11 - 1
CD for Legal Purposes Police 13 - 1
CD/DVD Materials Citywide 1 - 1
Central Park - Picnic Area Parks and Recreation 12 - 2
Certificate of Compliance Community Development 6 - 6
Certificate of Compliance Processing Public Works 14 - 2 17 - 2
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Certificate of Correction Processing Public Works 14 - 1 Change of Name, Address or Business Type as Shown on
Current Certificate
Finance 8 - 1
Chapel Rental Parks and Recreation 11 - 8
Citation Sign Off Police 13 - 1
City Flag Finance 8 - 2
City Plaza Park Gazebo Parks and Recreation 12 - 2
City to Repurchase Interment Rights Parks and Recreation 11 - 6 Cleanout Box Only Water and Sewer Utilities 16 - 12
Clean-Up Campaign Debris Bag Public Works 15 - 5
Clearance Letter Police 13 - 1
Closing Out Sale Police 13 - 2
Closure of an Onsite Hazardous Waste Treatment System Fire 9 - 6 Code Enforcement Re-Inspection Community Development 6 - 9 Collection Agency Fee Library 10 - 1
Color Photographs Police 13 - 2
Combination Agreement/Grant Deed for the Same Lot Public Works 14 - 7 Combustible and Flammable Materials Fire 9 - 30
Commercial Day Care (E3) Fire 9 - 32
Commercial/Multi-Family/Industrial Scaled Permit Community Development 4 - 18 Community Development Department Referrals Fire 9 - 12
Community Garden Space Membership Parks and Recreation 12 - 8 Community Recreation Center Room Rental Parks and Recreation 12 - 1 Compressed Gas Installation Fire 9 - 7
Concrete Removal/Replace Public Works 15 - 3
Construction & Demolition Public Works 15 - 5
Contract Administration Community Development 6 - 9
Cooking Oil Storage Tanks Fire 9 - 7
Copy Fee Citywide 1 - 1
Copies Public Works 14 - 5
Corrosives Fire 9 - 30
Cost Analysis for Development Public Works 14 - 15
Credit Card Convenience Fee Citywide 1 - 2
17 - 3
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Cremation Parks and Recreation 11 - 2
Crime Analysis Reports Police 13 - 2
Cryogenic Fluids Fire 9 - 30
Custom Hourly Rate Parks and Recreation 11 - 7
Delinquent Payment of Business Certificate Tax Finance 8 - 1 Delinquent Reconnect Finance 8 - 3
Delinquent Service Letter Finance 8 - 2
Design Review/Consultation Fire 9 - 18
Development Agreement Community Development 6 - 6
Development Impact Analysis Water and Sewer Utilities 16 - 11 Development Impact Fees Community Development 5 - 4
Dig Single Depth Grave to Double Depth Parks and Recreation 11 - 7 Disinter and Reinter Casket into Same Grave Parks and Recreation 11 - 3 Disinternment Parks and Recreation 11 - 2
Dispatch Service Required for Special Events Police 13 - 2 Distribution Pole Contact Electric Utility 7 - 7
Document Recordation Public Works 14 - 7
Driving Under the Influence Emergency Response Police 13 - 2 Duplicate Business Certificate Finance 8 - 1
Electric Disconnection Fee Electric Utility 7 - 4
Electric Equipment Relocation Electric Utility 7 - 6
Electric Reconnection Fee Electric Utility 7 - 4
Electric Replacement/Reconnection Fee Due to Meter
Tampering/Illegal Access
Electric Utility 7 - 4
Electric System Damage Electric Utility 7 - 3
Electrical Permit Community Development 4 - 2
Emergency Alarm Systems Fire 9 - 7
Emergency Responder Radio Coverage System Fire 9 - 7
Encroachment Agreement Application Public Works 14 - 6
Encroachment Permit Public Works 14 - 3
Encroachment Permit: Field Marking - Sanitary Sewer Water and Sewer Utilities 16 - 13 Energy Storage Systems Fire 9 - 17
Engineering Plan Check - Electric Electric Utility 7 - 5 17 - 4
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Engineering Plan Review (Streets) Public Works 15 - 3
Engineering Referrals Fire 9 - 8
Environmental Review Community Development 6 - 5
Environmental Impact Report Fire 9 - 8
Equiment Rentals Parks and Recreation 12 - 3
Exhibit and Trade Shows Fire 9 - 8
Existing Improvements Public Works 14 - 10
Expedited Plan Review Service Community Development 4 - 20 Expired Construction Permit Fire 9 - 34
Facility Rental Fire 9 - 2
False Alarm Calls Police 13 - 3
False Alarm Responses Fire 9 - 34
Fats, Oils, and Grease (FOG) Water and Sewer Utilities 16 - 13 Fee for Work Commencing Before Permit Issuance Community Development 4 - 20 Field Fire Hydrant Flow Test Water and Sewer Utilities 16 - 5 Field Marking - Fiber Electric Utility 7 - 6
Field Marking - Recycled Water Water and Sewer Utilities 16 - 9 Field Marking - Water Water and Sewer Utilities 16 - 8
Field Preparation Parks and Recreation 12 - 5
Field Sample - Environmental Laboratory Analysis Fire 9 - 42 Fields and Turf Areas Reservations Parks and Recreation 12 - 4 Final Map Checking Public Works 14 - 1
Fingerprinting Police 13 - 3
Fire Alarm Systems Fire 9 - 9
Fire Alarm Systems with Pre-Wire Inspection Required Fire 9 - 9 Fire Flow (Hydraulic Model) Water and Sewer Utilities 16 - 10 Fire Hydrant Water and Sewer Utilities 16 - 4
Fire Pump Installation Fire 9 - 10
Fire Safety Demolition/Construction Plan Fire 9 - 17
Fire Service Water and Sewer Utilities 16 - 4
Fire Service Upgrade Water and Sewer Utilities 16 - 4
First Tent, Canopy or Air Supported Structure Fire 9 - 14 Flammable and Combustible Liquids Materials Fire 9 - 30 17 - 5
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Flat Marker Parks and Recreation 11 - 5
Flood Zone Verification Community Development 6 - 7
Foundation Repair / Seismic Upgrade Community Development 4 - 16 General Plan / Advanced Planning Surcharge Community Development 4 - 2 General Plan Amendment Community Development 6 - 5
Grading Permit Community Development 4 - 11
Grading Plan Review Community Development 4 - 11
Hazardous Material Tool/Equipment Installation Fire 9 - 11 Hazardous Materials Business Plan Fire 9 - 41
Hazardous Materials Closure Plan Fire 9 - 11
Hazardous Materials Tool/Equipment Modification Fire 9 - 17 Hazardous Waste Generator Fire 9 - 38
High-Piled Combustible Storage Fire 9 - 11
High-Rise Fire 9 - 32
High-Rise Fire Protection Water Storage Tank Fire 9 - 10 High-Rise R-1/R-2 Fire 9 - 32
Highly Toxic Materials Fire 9 - 30
Historical & Landmarks Community Development 6 - 8
Hold Harmless Agreement Water and Sewer Utilities 16 - 10 Hospitals Fire 9 - 33
Hourly Rate for Miscellaneous Services Fire 9 - 20
Hourly Rate (Personnel) Parks and Recreation 11 - 7
Hourly Staff (As-Needed) Assigned to Facility Parks and Recreation 12 - 3 ID Card Renewal/Replacement Police 13 - 3
In-House Planning Rate Community Development 6 - 9
Industrial/Commercial Facility Stormwater Inspections Public Works 15 - 1 Insertion Valve Installation Water and Sewer Utilities 16 - 10 Inscribe Shutters or Grave Markers Parks and Recreation 11 - 4 Installation of a Flower Vase and Ring on a Niche Parks and Recreation 11 - 4 Installation of a Monobar, Emblem, Flower Vase, or Ring on a Crypt Parks and Recreation 11 - 4 17 - 6
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Installation of a Niche Plaque Parks and Recreation 11 - 4 Installation of Grave Marker Parks and Recreation 11 - 4 Jails Fire 9 - 33
Jump House Permit Parks and Recreation 12 - 7
Jury Fees Citywide 1 - 2
Knox Box Installation Fire 9 - 12
Late Filing of Documents/Reports/Information Fire 9 - 35 Late Payment of CUPA Fire 9 - 35
Late Payment of Operational Permits Fire 9 - 35
Late Payment Penalty for Multi-Family Monitoring Fee Community Development 5 - 5 Licensed Care Facility Fire 9 - 20
Liquefied Petroleum Gas Fire 9 - 30
Liquefied Petroleum Gases - Installation Per Tank Fire 9 - 12 Load Development Electric Utility 7 - 2
Loan Demand Payoff Community Development 5 - 1
Lobbying Activities City Clerk 2 - 1
Lot Line Adjustment Processing Public Works 14 - 2
Mailed Notices Community Development 6 - 3
Maintenance Fee Parks and Recreation 11 - 3
Maps Community Development 6 - 3
Massage Application / Inspections Police 13 - 3
Master Plan Fee Community Development 4 - 13
Mechanical Permit Community Development 4 - 5
Meter Reading More Than Once Per Month Finance 8 - 3
Meter Test Deposit Electric Utility 7 - 3
Methane Venting and Detection Systems Fire 9 - 12
Microfilm Copies Fire 9 - 37
Mills Act Application Community Development 6 - 6
Mills Act Plaques Community Development 6 - 7
Minor Modifications Community Development 6 - 2
Minor Residential Combination Permits Community Development 4 - 1 Miscellaneous CUPA Inspections, CUPA Plan Reviews or
CUPA Field Sampling
Fire 9 - 42
17 - 7
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Miscellaneous Haz Mat Inspections, Haz Mat Plan Reviews or Haz Mat Field Sampling
Fire 9 - 19
Miscellaneous Inspections or Plan Reviews Fire 9 - 19
Mission City Memorial Park Interment Rights and Burial Materials Parks and Recreation 11 - 12 Motor Funeral Escort Police 13 - 4
Multi-Family Loan Conversion Community Development 5 - 3 Multi-Family Loan Origination Community Development 5 - 3 Multi-Family Loan Recapitalization Community Development 5 - 3 Multi-Family (MF) Loan Subordination Request Review Community Development 5 - 1 Multi-Family Monitoring Community Development 5 - 2
Multi-Family Project Refinance Community Development 5 - 3 Multi-Family Project Restructuring - Transfer of Ownership Community Development 5 - 3 Multi-Family Transaction Application Review Community Development 5 - 2 Multi-Story Buildings Fire 9 - 27
Municipal Services Information Finance 8 - 3
Neighborhood Conservation Improvement Program (NCIP) Loan Application Community Development 5 - 1 Neighborhood Parks Parks and Recreation 12 - 6
No-Fee Parade Permit City Manager 3 - 1
Non-Exclusive Franchise Hauler Application Public Works 15 - 5 Non-Historical Referral to Historical and Landmarks Commission Community Development 6 - 8 Off-Duty Employment Police 13 - 5
Off-Site Parking Community Development 6 - 2
On-Demand Mobile Fueling Site Permit Fire 9 - 16
Onsite Treatment of Hazardous Waste Annual Fee Fire 9 - 39 Open Burnings Fire 9 - 12
Operation & Maintenance Inspection of Stormwater Treatment Systems Public Works 15 - 1 Operational Permits Fire 9 - 21
Organic Peroxides Fire 9 - 30
Other Inspections and Fees Community Development 4 - 12 Outside 3rd Party Review (public ROW or easements) Public Works 14 - 7 Outside 3rd Party Review (survey or mapping) Public Works 14 - 8 Ovens Fire 9 - 12
Overhead Lines - New Electric Utility 7 - 1
17 - 8
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Oversize, Overweight Vehicles Public Works 14 - 12
Outdoor Assembly Event Fire 9 - 20
Overtime Haz Mat Inspection Fire 9 - 19
Overtime Inspection Fire 9 - 19
Overtime Plan Check, Mapping Review Public Works 14 - 7 Overtime Haz Mat Plan Review Fire 9 - 19
Overtime Plan Review Fire 9 - 19
Organic Materials Fire 9 - 31
Parcel Map and Record of Survey Checking Public Works 14 - 1 Park Building Room Rentals Parks and Recreation 12 - 1
Parkways and Boulevards Plan Review Public Works 15 - 4 Patrick Henry Drive CFD Formation Community Development 6 - 11 Patrick Henry Drive Specific Plan Area Impact Public Works 14 - 12 Pavement Restoration Public Works 15 - 3
Pawn/Secondhand Dealer Police 13 - 5
Payment Default Citywide 1 - 1
Permit Extension Community Development 4 - 14
Permit Issuance Community Development 4 - 2
Permit to Final (per trade) Community Development 4 - 13 Perpetual Care (Endowment) Parks and Recreation 11 - 8
Phased Permitting/Occupancy Plan Fire 9 - 17
Phased Plan Check (per each phase) Community Development 4 - 13 Photo CD's Police 13 - 5
Photographs Fire 9 - 37
Photovoltaic Community Development 4 - 15
Plan Duplication Community Development 4 - 14
Plan Revision Fire 9 - 18
Plant Extraction Systems Fire 9 - 18
Plumbing Permit Community Development 4 - 8
Police Reports Police 13 - 6
Pool Demo Community Development 4 - 16
Pool Rentals Parks and Recreation 12 - 7
Portable Hydrant Meter and Deposit Water and Sewer Utilities 16 - 5 17 - 9
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Pre-Application Community Development 6 - 7
Preparation of Agreement/Easement/Grant Deed Public Works 14 - 6 Preparation or Peer Review of Technical Report Community Development 6 - 9 Private Land Drainage Area (PLDA) Program Inspection Public Works 15 - 2 Private Security Police 13 - 6
Project Clearance Committee Review Public Works 14 - 14 Project Clearance Committee/Subcommittee Review Electric Utility 7 - 5 Project Clearance Committee/Subcommittee Review Water and Sewer Utilities 16 - 10 Public Entertainment Police 13 - 6
Public Fireworks Display and Pyrotechnic Special Effects Use Fire 9 - 13 Pyrophoric Materials Fire 9 - 31
Pyrotechnics Special Effects Proximal to Audience Fire 9 - 13 R-1/R-2 Occupancies Fire 9 - 32
Racquet Court Reservations Parks and Recreation 12 - 5
Re-Inspection Fire 9 - 34
Record Drawings Archiving Public Works 14 - 6
Recreation Cancellation Parks and Recreation 12 - 5
Recreation Center Auditorium / Senior Center Parks and Recreation 12 - 1 Recreation Classes Parks and Recreation 12 - 8
Recreation Course/Class Cancellation, Withdrawal Admin Fee Parks and Recreation 12 - 8 Recreation Tax (Bedroom) Public Works 14 - 11
Recycled Hydrant Meter and Deposit Water and Sewer Utilities 16 - 6 Refrigeration System Fire 9 - 13
Release of Stored Vehicles Police 13 - 7
Remove and Dispose of Marker, Marker Frame, Plaque, Vase and Ring Parks and Recreation 11 - 5 Replacement Fee for Lost Link+ Materials Borrowed from Other Libraries Library 10 - 1 Replacement Fee for Lost or Damaged Library Card Library 10 - 1 Replacement Fee for Portable Electronic Devices Library 10 - 1 Replacement for Library Materials Library 10 - 1
Replacement Permit Community Development 4 - 14
Repo Fee (Repossessed Vehicles) Police 13 - 7
Reposting of Public Notification Community Development 6 - 4 Residential Development Park Dedication In-Lieu Fees Parks and Recreation 12 - 9 17 - 10
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Residential Fire-Building Plan Review (R-3/R3.1 Occupancies Only) Fire 9 - 20 Residential Loan Refinance/Subordinations All Programs Community Development 5 - 1 Residential Parking Permit Police 13 - 7
Residential Reroof Community Development 4 - 16
Residential Scaled Permit Community Development 4 - 16
Resource Fees Fire 9 - 2
Resubmittal Fee Fire 9 - 18
Review and Stamp Transfer of Lost Plan Set Community Development 4 - 14 Review of Agreements and Easements Public Works 14 - 7
Review of Permit to Enter Agreement onto City Property Public Works 14 - 7 Review of Right of Entry Agreement onto City Property Public Works 14 - 7 Rezoning Community Development 6 - 1
Sanitary Sewer Capacity Model Run Public Works 14 - 9
Sanitary Sewer Conveyance Fee Public Works 14 - 9
Sanitary Sewer Outlet Charge Public Works 14 - 8
Sanitize Crypt Parks and Recreation 11 - 6
Saturday Service Parks and Recreation 11 - 7
SB Review Community Development 6 - 7
School Fire 9 - 32
Second Response Ordinance Police 13 - 7
Secondary Fireworks/Pyro Submittal - No Detailed Plan Review Required Fire 9 - 13 Secondary Pyro Submittal - No Detailed Plan Review Required Fire 9 - 13 Security Deposit for Survey Public Works 14 - 2
Senior Citizens Center Parks and Recreation 12 - 3
Service Disconnection Electric Utility 7 - 4
Service Fee Customer - Owned Equipment Problem Electric Utility 7 - 4 Service Reconnection Electric Utility 7 - 4
Service Removal Electric Utility 7 - 5
Service Turn-On Finance 8 - 2
Service Wire Relocation Electric Utility 7 - 3
Sewer Lateral Cleanout Water and Sewer Utilities 16 - 12 Sewer Lateral Installation Water and Sewer Utilities 16 - 12 Sewer Lateral Video Inspection Water and Sewer Utilities 16 - 13 17 - 11
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Shared Mobility Permit and Impound Public Works 14 - 16 Short Term Rental Permit Community Development 6 - 10
Short Term Wastewater Discharge Permit Water and Sewer Utilities 16 - 13 Significant Property Alteration Community Development 6 - 10 Signs Community Development 6 - 6
Single or Double Upright Monument Foundation Parks and Recreation 11 - 5 Single Story Buildings Fire 9 - 27
Smoke Control System Fire 9 - 13
Solar Domestic Hot Water System Installation Water and Sewer Utilities 16 - 15 Solar Domestic Hot Water System Panel Removal and Replacement Water and Sewer Utilities 16 - 15 Solar Photovoltaic System Fire 9 - 16
Solar Pool Heating System Installation Water and Sewer Utilities 16 - 15 Solar Pool Heating System Panel Removal and Replacement Water and Sewer Utilities 16 - 15 Solicitor/Peddler Police 13 - 8
Solid Waste Management Public Works 15 - 5
Special Event Application Parks and Recreation 12 - 6
Special Event Parking at Parks and Recreation Facilities Parks and Recreation 12 - 7 Special Event Food or Merchandise Vendor Parks and Recreation 12 - 8 Special Event Structure Fire 9 - 15
Specific Plan Community Development 6 - 10
Standpipe Systems Fire 9 - 13
State of California Annual Surcharges Fire 9 - 40
Storage or Refuse Bins on City Street Public Works 14 - 13 Storage Tanks - Hazardous Materials Fire 9 - 14
Storm Drain Medallion Fee Public Works 15 - 2
Storm Drain Outlet Charge Public Works 14 - 8
Storm Outlet Charge Public Works 14 - 8
Stormwater Management Plan Review Community Development 6 - 8 Stormwater Management Building and Planning Public Works 15 - 2 Street Tree Planting Public Works 15 - 4
Street Tree Removal Public Works 15 - 4
Subdivision Committee Review Public Works 14 - 13
Subpoena Fees Citywide 1 - 1
17 - 12
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
SVP System Impact Study Electric Utility 7 - 6
SVP Generation Interconnection Study Electric Utility 7 - 6 Tasman East Specific Plan Area Impact Public Works 14 - 12 Taxicab/Pedicab Company Police 13 - 8
Taxicab/Pedicab Driver Police 13 - 8
Technology Fee Citywide 1 - 1
Technology Fee (Building Fees) Community Development 4 - 2 Temporary Certificate of Occupancy Community Development 4 - 13 Temporary Connection to Pole Electric Utility 7 - 2
Temporary Power Electric Utility 7 - 2
Temporary Sanitary Sewer Discharge Public Works 14 - 13 Time Extensions Community Development 6 - 9
Time of Use Meter Installation Electric Utility 7 - 5
Tournament Parks and Recreation 12 - 7
Tow Drivers Police 13 - 9
Toxic Materials Fire 9 - 31
Traffic Flow Map Public Works 14 - 13
Traffic Impact Public Works 14 - 11
Traffic Sign Fabrication Public Works 15 - 3
Training Fire 9 - 1
Transportation Demand Management Fee Community Development 6 - 10 Tree Removal Community Development 6 - 8
Underground - Existing Electric Utility 7 - 1
Underground - New Electric Utility 7 - 1
Underground and Above Ground Tank Installations Fire 9 - 14 Underground and Above Ground Tank Modifications Fire 9 - 14 Underground and Above Ground Tank Removals Fire 9 - 14
Underground Fire Service Systems Fire 9 - 15
Underground Hazardous Materials Tank Fire 9 - 41
Underground Street Light Relocation Electric Utility 7 - 3 Unstable (Reactive) Materials Fire 9 - 31
USB Drive for Police Reports Police 13 - 9
Use Permits Community Development 6 - 2
17 - 13
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Using Library Meeting Room Library 10 - 1
Utility Billing Splitting or Combining Accounts Finance 8 - 3 Utility Engineering Plan Review & Inspection Water and Sewer Utilities 16 - 6 Utility Service Deposit Finance 8 - 2
Variance Community Development 6 - 1
Vault Disposal Parks and Recreation 11 - 6
Verification of Electric Meter Address Finance 8 - 3
Wastewater Treatment Plant Capacity Water and Sewer Utilities 16 - 14 Water and Fire Service Tap Water and Sewer Utilities 16 - 9 Water Efficiency Review Water and Sewer Utilities 16 - 7 Water Meter and Backflow Preventer Water and Sewer Utilities 16 - 2 Water Meter (Device Cost) Water and Sewer Utilities 16 - 2 Water Meter Test Water and Sewer Utilities 16 - 6
Water Reactive Materials Fire 9 - 31
Water Reconnection Water and Sewer Utilities 16 - 8
Water Service Water and Sewer Utilities 16 - 1
Water Service Abandonment Water and Sewer Utilities 16 - 8 Water Service Dual Meter Service Water and Sewer Utilities 16 - 2 Water Service Relocation Water and Sewer Utilities 16 - 8 Water Service Upgrade Excluding Device Cost Water and Sewer Utilities 16 - 11 Water Supply Assessment Preparation Water and Sewer Utilities 16 - 7 Watershed Map Public Works 14 - 6
Youth Activity Center Room Rental Parks and Recreation 12 - 4 Youth Activity Center Gymnasium Rental Parks and Recreation 12 - 4 Youth & Teen Center Room Rental Parks and Recreation 12 - 6 Zoning Clearance Community Development 6 - 1
Zoning Code Text Amendment Community Development 6 - 1
Zoning Verification Community Development 6 - 7
17 - 14

← All documents from this meeting