Cities Index.
Resolution No. 25-9437

City Council and Authorities Concurrent
April 29, 2025

Document
Resolution No. 25-9437
Meeting
April 29, 2025
Body
City Council and Authorities Concurrent
Pages
3
Original file
16.0 MB
Text extracted from the city's file for reading and search. Open the original on santaclara.legistar1.com. That file is the official record.

Resolution/Municipal Fee Schedule Page 1 of 3

RESOLUTION NO. 25-9437

A RESOLUTION OF THE CITY OF SANTA CLARA,
CALIFORNIA, ADOPTING THE “CITY OF SANTA CLARA
2025/26 MUNICIPAL FEE SCHEDULE”

WHEREAS, for the previous fiscal year 2024/25 (July 1, 2024 to June 30, 2025) the Santa Clara City Council (“City Council”) adopted certain fees by Resolution No. 24-9316 (“2024/25 Fee Schedule”);
WHEREAS, the City of Santa Clara (“City”) now desires to amend existing fees, eliminate certain fees, and impose new fees as set forth in the “PROPOSED CITY OF SANTA CLARA 2025/26 MUNICIPAL FEE SCHEDULE” (“Fee Schedule”) attached to the staff report accompanying this Resolution and incorporated herein by reference; WHEREAS, unchanged fees will continue to be charged at the rate set forth in the FY 24/25 Fee Schedule adopted under Resolution 24-9316;
WHEREAS, in compliance with Article XIIIC of the California Constitution and as also detailed in the Fee Schedule, the fees, rates, rental fees, fines, and charges (hereinafter, “Fee” or “Fees”) in the Fee Schedule are not taxes and are
(a) fees imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the City;
(b) fees imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the City;
(c) fees imposed for the reasonable regulatory costs to the City for issuing licenses and permits, performing investigations, inspections, and audits; (d) fees imposed for entrance to or use of local government property, or the purchase, rental, or lease of local government property;
//
Resolution/Municipal Fee Schedule Page 2 of 3

(e) fines, penalties, or other monetary charges imposed by the City as a result of a violation of law;
(f) charges imposed as a condition of property development; and/or (g) assessments and property-related fees imposed in accordance with the provisions of Article XIIID of the California Constitution;
WHEREAS, in adopting the Fee Schedule, the City exercises its powers under (a) Article XI, Section 7 of the California Constitution, (b) Article XIIIC of the California Constitution, (c) Section 50076 of the California Government Code, (d) the Charter of the City of Santa Clara, (e) the Code of the City of Santa Clara, California, and (f) any other applicable laws; WHEREAS, the City made available the proposed Municipal Fee Schedule for public review and comment ten (10) days prior to the public hearing for the proposed Fees; WHEREAS, on April 9 and April 16, 2025, the City timely published notice of the public hearing in the Santa Clara Weekly in the manner set forth in Government Code Sections 6062a and 66018;
WHEREAS, the City mailed notice of the public hearing to all persons requesting such notice pursuant to Government Code Section 66016;
WHEREAS, on April 29, 2025, the City Council held a public hearing on the Fees set forth in the Fee Schedule; and
WHEREAS, also on April 29, 2025, the City Council discussed and determined, by Resolution 25-9436, the amounts to be charged as field and turf user fees (agenda item 25-377), which shall also be included in the FY 25/26 Municipal Fee Schedule.

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. The findings as set forth herein above are hereby adopted by the City Council of Santa Clara.
//
//

2. Adoption of Fees, Rates and Charges. The Fees contained in the "CITY OF SANTA CLARA 2025/26 MUNICIPAL FEE SCHEDULE" are hereby adopted. The field and turf user fees adopted under Resolution 25-9436 shall be included in the "CITY OF SANTA CLARA 2025/26 MUNICIPAL FEE SCHEDULE."

3. Effect of Fees Prior to effective Date of Resolution. This Resolution shall not be construed so as to affect any fee or charge payable or paid under any applicable fee schedule operative prior to the effective date of this Resolution, except to the extent that the Fee Schedule supersedes the 2024/25 Fee Schedule for new fees, amended fees, and deleted fees.

4. Effective date. The Fees set forth in the "CITY OF SANTA CLARA 2025/26 MUNICIPAL FEE SCHEDULE" described in Section 2 above shall be effective on July 1, 2025.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 2grH DAY OF APRIL, 2025, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

Attachments incorporated by reference:

1. City of Santa Clara 2025/26 Municipal Fee Schedule

2. Resolution 25-9436
Resolution/Municipal Fee Schedule
Chahal, Cox, Gonzalez, Hardy, Jain, and Park, and
Mayor Gillmor
None
None
None
ATTES~

NORAPIMENTEL,MM

ASSISTANT CITY CLERK

CITY OF SANTA CLARA

Page 3 of 3 ends

Page
2 5
1 – 1
2 – 1
3 – 1
4 – 1
5 – 1
6 – 1
7 – 1
8 – 1
9 – 1
10 – 1
11 – 1
12 – 1
13 – 1
14 – 1
15 – 1
16 – 1
17 – 1
18 – 1
Resolution………………………………………………………………………………………………………………………………… Fire………………………………………………………………………………………………………………………………….… Library……………………………………………………………………………………………………..……………………….… Parks and Recreation:

Cemetery………………………………………………………………………………………….……………………….……… Recreation………………………………………………………………………………………...……………………….……… Police……………………………………………………………………………………………………………………………….… Public Works:

Engineering……………………………………………………………………………………….……………………….……… Street……………………………………………………………………………………………………………………….……… Water and Sewer Utilities……………………………………………………………………………….……………………….… Alphabetical Listing by Fee……………………………………………………………………………………..………………………

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Table of Contents
Finance…………………………………….……………………………………………...........…………………………………… Reader’s Guide……………………………………………………………………………………………………............................

List of Separately Published Fee Schedules……………………………………………….......................................................

Fees Included in this Document:

Citywide………………………………………………………………………………………………….…………………………… City Clerk……………………………………………………………………………………………………………………………… City Manager………………………………………………………………………..........……………………….………………… Community Development:

Building…………………………………………………………………………………………………………………….……… Housing and Community Services…………………………………………………………….……………………….……… Planning…………………………………………………………………………………………..……………………….……… Electric Utility………………………………………….……………………………………………...........………………………… 1 The purpose of this Reader’s Guide is to make the City of Santa Clara FY 2025/26 Municipal Fee Schedule easier to review. The Reader’s Guide highlights information contained in this document, defines terminology used in column headers, and briefly explains how voter approved Proposition 26 impacts the Schedule.

Fees, rates, and charges are intended to encompass all charges established by license, permit fees, utility charges, refuse collection and any other charges for goods and services and use of City-owned or operated facilities. Certain fees omitted from the Municipal Fee Schedule are published separately and noted on page V of this schedule. Such fees and charges published separately are unique because they are mandated by external agencies or because they receive special attention and review from City Council prior to adoption.

A comprehensive listing of the City’s fees, rates, and charges, arranged in sections by department make up the City of Santa Clara Municipal Fee Schedule. During an annual review, each department recommends appropriate adjustments after considering the total costs to the City for each service provided. Costs include (1) personnel time (providing the service and collecting data), (2) equipment used, (3) material, service and supply costs, (4) department and City-wide overhead, and (5) any other costs that may be incurred that are directly related to the specific fees, rates or charges. Periodically, the City will contract with an outside consultant to perform a comprehensive review/study of fees. For FY 2024/25, ClearSource Financial Consulting completed a Cost of Services (User Fee) Study.

For interim years, the majority of fees are generally proposed to increase by a cost-of-living adjustment, typically calculated as the most recent annual change in the regional consumer price index (CPI) or a change in the organization’s costs. The CPI change for the most recent year was 3.5%. This minor recalibration of fees is simply intended to maintain cost recovery levels consistent with the fees previously adopted by the City Council. In addition to the general inflationary changes proposed for fees, other cost-of-living adjustments implement specific inflators for certain fees, align with mandates, and provide further clarification.

Proposition 26
Proposition 26, passed by voters on November 2, 2010, is a constitutional amendment that introduces, for the first time, a definition of what constitutes a local tax:

As used in this section, “tax” means any levy, charge, or exaction of any kind imposed by a local government…

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reader's Guide
2 CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

1. 2.

3. 4.

5. 6.

7. All fees, rates, and charges have been reviewed by the City Attorney’s Office and meet one or more of the exceptions to Proposition 26, or are not subject to Proposition 26.

Special Benefit or Privilege: A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege.

Government Service or Product: A charge imposed for specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service

Reader's Guide (Cont'd.)
Licenses and Permits: A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof.

Local Government Property: A charge imposed for entrance to or use of local government property, or the purchase, rental or lease of a local government property.

Fines and Penalties: A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government, as a result of a violation of law.

Property Development: A charge imposed as a condition of property development.

The Prop 218 Exception: Provides that property assessment and property-related fees that are already subject to the approval requirements of Proposition 218 are not taxes. Common examples include water and sewer rates and special district assessments such as Landscape and Lighting District Act assessments.

Under this definition, many requirements imposed by a local government that results in the local government receiving revenues are considered local taxes. This means that local government would need to obtain majority approval of the voters if the revenues are to be used for general governmental purpose and by two-thirds of voters if used for a specific purpose. In contrast, a fee may be adopted by a majority vote of City Council. There are seven (7) exceptions to this amendment under Proposition 26:
3 1.

2. 3.

4. 5.

6. 7.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Column Descriptors
Description of Fee, Rate, or Charge: Identifies the nature of the fee, rate, or charge.

Current Fee and Period: Identifies the current cost associated with the fee, rate, or charge.

Technology Fee: Identifies whether or not the Technology Fee applies.

Full Cost: Summarizes both direct and indirect costs associated with the fee, rate, or charge. If no cost is provided, the basis for the charge is defined either by ordinance or resolution, calculated separately based on individual circumstances, or established by an outside entity.

Date Fee Last Changed: The date the fee was last updated by ordinance and/or resolution.

Fee Detail:

Comments: Identifies special notes related to the specific fee, rate, or charge.

Charging Dept/Div: City Department/Division responsible for initiating the fee, rate, or charge.

Collecting Dept/Div: City Department/Division assigned to collect the fee, rate, or charge.

Objective: The reasoning as to why the City collects the fee, rate, or charge. This schedule may identify one or more of the following classifications: (1) Recover Cost, (2) User Tax, (3) User Fee, (4) Penalty, (5) Compliance, and (6) Impact Development Prop 26 Exception: Identifies exception classification for the fee, rate, or charge. The reader will see numbers 1-7, or a combination of 1-7, as some fees, rates, and charges fall under multiple classifications. N/A signifies the fee, rate, or charge is not a fee imposed exclusively by local government.
4 Community Development Department Public Works Department California Electrical Code Clean-Up Campagin Rates
California Administrative Code Garbage / Rubbish / Recycle Rates California Building Code, Volume

Household Hazardous Waste Rates
California Building Security Code Storm Drain Environmental Compliance Fee California Code for the Abatement of Dangerous Buildings California Housing Code
California Mechanical Code Water and Sewer Utilities Department California Plumbing Code Sewer Rates
Solar Domestic Hot Water System Service Charges
Solar Swimming Pool Heater Service Charges
Electric Utility Department Water Rates
Electric Rates
Parks and Recreation Department
Class Rates
Taxable items are subject to applicable sales taxes at prevailing tax rates.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
The Following is a List of Separately Published Fee Schedules.

These Schedules Are Not Included in This Document.

Copies of These Documents Can Be Found in the City Clerk's Office Located at City Hall and at Central Library's Reference Desk.
5 Department / Division: Citywide Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Copy Fee 0.20$ No Charged by: Date 6/10/2008 Objective: Recover Cost Copies of Statements of Public per page Citywide Economic Interest (Form 700)
Res. No. 08-7525 Prop 26 Exception: 1, 2 and Campaign Statements Collected by: are 10 cents per page for
Citywide Full Cost: 0.20$ copies.

CD / DVD Materials 3.00$ No Charged by: Date 6/10/2008 Objective: Recover Cost per CD / DVD Citywide
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Citywide Full Cost: 3.00$
Payment Default Fee 25.00$ No Charged by: Date 7/16/2019 Objective: Recover Cost CA Civil Code 1719 (includes NSF check, direct Citywide
payment decline, default Ord. No. Prop 26 Exception: 1, 2, 5 credit card charge) Collected by:

Citywide Full Cost: 25.00$
Technology Fee 3.37% of applicable fees Yes Charged by: Date 7/16/2019 Objective: Recover Cost Citywide
Ord. No. Prop 26 Exception: 1, 2
Collected by:

Citywide Full Cost: varies
Subpoena Fees 275.00$ No Charged by: Date 4/22/2014 Objective: Compliance All Employees (deposit) Citywide
Ord. No. Prop 26 Exception: N/A *
Collected by:

Citywide Other (specify): Full Cost: N/A
CMD 17

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 1 - 1
Department / Division: Citywide Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Jury Fees 30.00$ No Charged by: Date 6/12/2001 Objective: Recover Cost Federal District Court per day and IRS Citywide
Business Mileage Rate Ord. No. Prop 26 Exception: N/A * Collected by:

Citywide Other (specify): Full Cost: N/A
CMD 25
Credit Card Convenience Fee Fees assessed by third- No Charged by: Date 12/3/2024 Objective: Recover Cost See note [a] party vendors to use Citywide
credit card / other Res. No. 24-9402 Prop 26 Exception: 1, 2 payment types Collected by:

Citywide Full Cost: varies
[a] Credit Card transaction limits: minimum of $5, maximum of $7,500 for residential, and maximum of $100,000 for commercial customer payments. Maximum limit does not apply to Cemetery and Industrial customers. Pursuant to Resolution No. 24-9402 adopted on 12/3/2024. * Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 1 - 2

Department / Division: City Clerk's Office Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Lobbying Activities Charged by: Date 4/23/2024 Objective: Recover Cost Annual registration is due by Annual Registration Fee 773.00$ No City Clerk's User Fee January 15th of a given year.

Office Res. No. 24-9316 Prop 26 Exception: 3
Collected by: Full Cost: 800.06$
City Clerk's
Office
Lobbying Activities Charged by: Date 4/23/2024 Objective: Recover Cost Persons registering for the Prorated Registration Fee 364.00$ No City Clerk's User Fee first time after June 30th of a Office Res. No. 24-9316 Prop 26 Exception: 3 given year.

Collected by: Full Cost: 376.74$
City Clerk's
Office
Lobbying Activities
Charged by: Date 4/23/2024 Objective: Recover Cost Lobbyists with a change to Amended Registration Fee 182.00$ No City Clerk's User Fee registration information shall Office Res. No. 24-9316 Prop 26 Exception: 3 file an amended registration within fifteen (15) days of such
Collected by: Full Cost: 188.37$ change if he or she has City Clerk's accepted a new client for
Office compensation in excess of five
hundred dollars ($500.00).

Lobbying Activities Charged by: Date 4/23/2024 Objective: Recover Cost Client Registration Fee 136.00$ No City Clerk's User Fee per client Office Res. No. 24-9316 Prop 26 Exception: 3 Collected by: Full Cost: 140.76$
City Clerk's
Office

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 2 - 1
Department / Division: City Clerk's Office Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Lobbying Activities Charged by: Date 12/5/2017 Objective: Recover Cost Up to a maximum of $500.00 Delinquent Fee 25.00$ No City Clerk's Penalty (Non-Compliance Fine) per day Office Res. No. 17-8483 Prop 26 Exception: 5 Collected by: O. No.: 1949 Full Cost: 25.00$
City Clerk's
Office O. Date: 1/12/2016
Reference: CMD 109 2 - 2

Department / Division: City Manager's Office Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
No-Fee Parade Permit Charged by: Date 9/18/2018 Objective: See Resolution No. 18-8606 For Santa Clara non-profit organizations No Fee No City Manager's Office Res. No. 18-8606 Prop 26 Exception:

Collected by: Full Cost: 692.42$
City Manager's
Office

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 3 - 1

Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
MINOR RESIDENTIAL COMBINATION Charged by: Date: 4/29/2025 Objective: Recover Cost Additional fees apply PERMIT FEES Building Division (e.g., permit issuance fee Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) A/C (with or w/o Furnace) - Relocation 397.00$ Yes Collected by:

Building Division Full Cost: 397.44$
A/C (with or w/o Furnace) - Same 159.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Location Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected by:

Building Division Full Cost: 159.39$
Furnace Replacement - Relocation 397.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected by:

Building Division Full Cost: 397.44$
Furnace Replacement - Same Location 238.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected by:

Building Division Full Cost: 238.05$
New Tankless Water Heater 319.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected by:

Building Division Full Cost: 319.82$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 4 - 1
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Water Heater - Relocate Existing 319.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Water Heater Building Division (e.g., permit issuance fee Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected by:

Building Division Full Cost: 319.82$
Permit Issuance Fee 98.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Building Division Full Cost: 99.18$
Technology Fee 3.37% of Building Permit No Charged by: Date: 7/16/2019 Objective: Recover Cost Fee, Electrical Permit Building Division
Fee, Plumbing Permit Res. No. Prop 26 Exception: 1, 2
Fee, Mechanical Permit Collected by:

Fee, Plan Check, and Building Division Full Cost: 3.37% Other Applicable Fees
as Stated in the
"Technology Fee"
Column
General Plan / Advanced Planning 12.39% of Building No Charged by: Date: 7/16/2019 Objective: Recover Cost Surcharge Permit and Plan Check Planning Division
Fees Res. No. Prop 26 Exception: 1, 2
Collected by:

Building Division Full Cost: 12.39%
Reference: CMD 109 4 - 2
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Building Conformance Fee Valuation x $0.00032 No Charged By: Date: 6/22/2021 Objective: Recover Cost Building Division
Res. No. 21-8981 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: Valuation x
$0.00032
3-B ELECTRICAL PERMIT FEES Charged By: Date: 4/29/2025 Objective: Recover Cost SYSTEM FEE SCHEDULE Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
New Buildings or Alterations Collected By:

Commercial Buildings per sq. ft. 0.33$ Yes Building Division Full Cost: 0.33$ Residential Buildings per sq. ft. 0.24$ Yes Full Cost: 0.24$ New garages, carports and accessory 0.09$ Yes Full Cost: 0.09$ buildings per sq. ft.

Private Swimming Pools Charged By: Date: 4/29/2025 Objective: Recover Cost For new private, in-ground swimming 357.00$ Yes Building Division pools for single-family and multi-family Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 occupancies Collected By:

Building Division Full Cost: 357.08$
Outdoor Events Charged By: Date: 4/29/2025 Objective: Recover Cost For electric generators and 357.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 electrically driven rides Res. No. 25-9437 Full Cost: 357.08$ Collected By:

For mechanically driven rides and 357.00$ Yes Building Division Full Cost: 357.08$ walk-through attractions or
displays having electric lighting
For a system of area and booth lighting 357.00$ Yes Full Cost: 357.08$ Reference: CMD 109 4 - 3
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Temporary Power Service Charged By: Date: 4/29/2025 Objective: Recover Cost For a temporary service power pole or 357.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 pedestal-mounted receptacle outlets and Res. No. 25-9437 appurtenances Collected By: Full Cost: 357.08$
Building Division
For a temporary distribution system and 357.00$ Yes Full Cost: 357.08$ temp lighting and receptacle outlets for
construction sites, decorative lights,
Christmas tree sales lots,
fireworks stands, etc.

UNIT FEE SCHEDULE Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division
Receptacle, Switch and Lighting Res. No. 25-9437 Prop 26 Exception: 1, 3 Outlets Collected By:

First 20, each 3.96$ Yes Building Division Full Cost: 3.96$ Additional fixtures, each 2.98$ Yes Full Cost: 2.98$ Lighting Fixtures Charged By: Date: 4/29/2025 Objective: Recover Cost First 20 fixtures, each 3.96$ Yes Building Division Prop 26 Exception: 1, 3 Res. No. 25-9437 Full Cost: 3.96$
Additional fixtures, each 2.98$ Yes Collected By:

Building Division Full Cost: 2.98$
For pole or platform-mounted lighting 7.00$ Yes fixtures, each Full Cost: 7.94$
For theatrical-type lighting fixtures or 7.00$ Yes Full Cost: 7.94$ assemblies, each
Reference: CMD 109 4 - 4
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Residential Appliances Charged By: Date: 4/18/2023 Objective: Recover Cost For fixed residential appliances or 23.00$ Yes Building Division receptacle outlets, each Res. No. 23-9221 Prop 26 Exception: 1, 3 Collected By:

Building Division Full Cost: 23.81$
Power Apparatus Charged By: Date: 4/29/2025 Objective: Recover Cost Up to and including 1, each 39.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 Res. No. 25-9437 Full Cost: 39.67$
Over 1 and not over 10, each 58.00$ Yes Collected By: Full Cost: 59.51$ Building Division
Over 10 and not over 50, each 98.00$ Yes Full Cost: 99.18$ Over 50 and not over 100, each 119.00$ Yes Full Cost: 119.03$ Over 100, each 158.00$ Yes Full Cost: 158.70$ Busways Charged By: Date: 4/29/2025 Objective: Recover Cost For trolley and plug-in-type busways, 98.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 each 100 feet Res. No. 25-9437
Collected By: Full Cost: 99.18$
Building Division
Signs, Outline Lighting and Marquees Charged By: Date: 4/29/2025 Objective: Recover Cost For signs, outline lighting systems or 98.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 marquees supplies from one branch Res. No. 25-9437
circuit Collected By: Full Cost: 99.25$
Building Division
For additional branch circuits with 78.00$ Yes Full Cost: 79.35$ the same sign, outline lighting system or
marquee
Reference: CMD 109 4 - 5
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Services Charged By: Date: 4/29/2025 Objective: Recover Cost For services of 600 volts or less and 158.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 not over 200 amperes in rating, each Res. No. 25-9437 Full Cost: 158.70$ Collected By:

For services of 600 volts or less and 277.00$ Yes Building Division Full Cost: 277.72$ over 200 amperes to 1,000 amperes
in rating, each
For services over 600 volts or 416.00$ Yes Full Cost: 416.59$ over 1,000 amperes in rating, each
Miscellaneous Apparatus, Conduits, Charged By: Date: 4/29/2025 Objective: Recover Cost and Conductors Building Division Prop 26 Exception: 1, 2, 3 For electrical apparatus, conduits, and 98.00$ Yes Res. No. 25-9437 conductors for which a permit is required Collected By: Full Cost: 99.18$ but for which no fee is herein set forth Building Division 3-C MECHANICAL PERMIT FEES Charged By: Date: 4/29/2025 Objective: Recover Cost NEW BUILDINGS Building Division Prop 26 Exception: 1, 2, 3 Res. No. 25-9437
New Commercial buildings, per sq. ft. 0.28$ Yes Collected By: Full Cost: 0.29$ Building Division
New Residential buildings, per sq. ft. 0.09$ Yes Full Cost: 0.09$ Reference: CMD 109 4 - 6
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
UNIT FEE SCHEDULE Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
Furnaces Res. No. 25-9437
For installation or relocation of 297.00$ Yes Collected By: Full Cost: 297.56$ forced-air or gravity-type furnace, Building Division
up to and including 100,000 Btu/h
For installation or relocation or 297.00$ Yes Full Cost: 297.56$ forced-air or gravity-type furnace,
over 100,000 Btu/h
For installation or relocation of 297.00$ Yes Full Cost: 297.56$ each floor furnace
For installation or relocation of each 297.00$ Yes Full Cost: 297.56$ suspended heater, recessed wall
heater or floor-mounted unit
Appliance Vents Charged By: Date: 4/29/2025 Objective: Recover Cost For the installation, relocation or 476.00$ Yes Building Division replacement of each appliance vent Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 not included in an appliance permit Collected By:

Building Division Full Cost: 476.10$
Repairs or Additions Charged By: Date: 4/29/2025 Objective: Recover Cost For the repair or, alteration of, or 476.00$ Yes Building Division additional to each Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected By:

Building Division Full Cost: 476.10$
Reference: CMD 109 4 - 7
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Boilers, Compressors and Absorption Charged By: Date: 4/29/2025 Objective: Recover Cost Systems Building Division Prop 26 Exception: 1, 2, 3
Up to and including 3 horsepower or up to 416.00$ Yes Res. No. 25-9437 Full Cost: 416.59$ and including 100,000 Btu/h Collected By:

Building Division
Over 3 horsepower to and including 15 476.00$ Yes Full Cost: 476.10$ horsepower or over 100,000 Btu/h to
and including 500,000 Btu/h
Over 15 to and including 30 horsepower 515.00$ Yes Full Cost: 515.77$ or over 500,000 to and including
1,000,000 Btu/h
Over 30 to and including 50 horsepower 574.00$ Yes Full Cost: 575.28$ or over 1,000,000 to and including
1,750,000 Btu/h
Over 50 horsepower or over 634.00$ Yes Full Cost: 634.80$ 1,750,000 Btu/h
Air Handlers Charged By: Date: 4/29/2025 Objective: Recover Cost Each unit up to and including 10,000 316.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 cubic feet per minute Res. No. 25-9437 Full Cost: 317.40$ Collected By:

Each unit Over 10,000 cfm 476.00$ Yes Building Division Full Cost: 476.10$ Evaporative Coolers Charged By: Date: 4/29/2025 Objective: Recover Cost For each evaporative cooler other than 476.00$ Yes Building Division portable type Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected By:

Building Division Full Cost: 476.10$
Reference: CMD 109 4 - 8
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Ventilation and Exhaust Charged By: Date: 4/29/2025 Objective: Recover Cost For each ventilation fan connected to 98.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 a single duct Res. No. 25-9437 Full Cost: 99.18$
Collected By:

For each ventilation system which is not a 178.00$ Yes Building Division Full Cost: 178.54$ portion of any heating or air-conditioning
system authorized by a permit
For the installation of each hood which is 476.00$ Yes Full Cost: 476.10$ served by mechanical exhaust
Incinerators Charged By: Date: 4/29/2025 Objective: Recover Cost For the installation or relocation of 238.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 each domestic-type incinerator Res. No. 25-9437 Full Cost: 238.05$ Collected By:

For the installation or relocation of 476.00$ Yes Building Division Full Cost: 476.10$ each commercial or
industrial-type incinerator
Miscellaneous Charged By: Date: 4/29/2025 Objective: Recover Cost For each appliance or piece of 476.00$ Yes Building Division equipment regulated by the Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Mechanical Code but not classified in Collected By:
other appliance categories Building Division Full Cost: 476.10$ 3-C PLUMBING PERMIT FEES Charged By: Date: 4/29/2025 Objective: Recover Cost NEW BUILDINGS Building Division Prop 26 Exception: 1, 2, 3 Res. No. 25-9437
New Commercial buildings, per sq. ft. 0.22$ Yes Collected By: Full Cost: 0.22$ Building Division
New Residential buildings, per sq. ft. 0.09$ Yes Full Cost: 0.09$ Reference: CMD 109 4 - 9
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
UNIT FEE SCHEDULE Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
Fixtures and Vents Res. No. 25-9437
For each plumbing fixture or trap or 238.00$ Yes Collected By: Full Cost: 238.05$ set of fixtures on one trap Building Division
For repair or alteration of drainage or 238.00$ Yes Full Cost: 238.05$ vent piping, each fixture
Sewers, Disposal Systems and Charged By: Date: 4/29/2025 Objective: Recover Cost Interceptors Building Division Prop 26 Exception: 1, 2, 3 For each building sewer and each trailer 238.00$ Yes Res. No. 25-9437 Full Cost: 238.05$ park sewer Collected By:

Building Division
For each cesspool 98.00$ Yes Full Cost: 99.18$ For each private sewage disposal 98.00$ Yes Full Cost: 99.18$ system
For each industrial waste pretreatment 238.00$ Yes Full Cost: 238.05$ interceptor
Rainwater systems - per drain 58.00$ Yes Full Cost: 59.51$ Water Piping and Water Heaters Charged By: Date: 4/29/2025 Objective: Recover Cost For installation, alteration, or repair of 238.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 water piping and/or water-treating Res. No. 25-9437 Full Cost: 238.05$ equipment Collected By:

Building Division
For each water heater including vent 238.00$ Yes Full Cost: 238.05$ Reference: CMD 109 4 - 10
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Water Softener 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 238.05$
Water Heater - Same Location 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Additional fees apply (like for like) Building Division (e.g., permit issuance fee Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 238.05$
Gas Piping Systems Charged By: Date: 4/29/2025 Objective: Recover Cost For each gas piping system of one to 158.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 five outlets Res. No. 25-9437 Full Cost: 158.67$
Collected By:

For each additional outlet over five 5.00$ Yes Building Division Full Cost: 5.95$ Reference: CMD 109 4 - 11
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Lawn Sprinklers, Vacuum Breakers Charged By: Date: 4/29/2025 Objective: Recover Cost and Backflow Protection Devices Building Division Prop 26 Exception: 1, 2, 3 For each lawn sprinkler system on 238.00$ Yes Res. No. 25-9437 Full Cost: 238.05$ any one meter Collected By:

Building Division
For atmospheric-type vacuum breakers or 98.00$ Yes Full Cost: 99.18$ backflow protection 1 to 5 devices
Over 5 devices, each 18.00$ Yes Full Cost: 19.84$ For each backflow protective device 238.00$ Yes Full Cost: 238.05$ other than atmospheric-type
vacuum breakers 2 in and smaller
Over 2 in 238.00$ Yes Full Cost: 238.05$ Swimming Pools Charged By: Date: 4/29/2025 Objective: Recover Cost Public pool 714.00$ Yes Building Division Prop 26 Exception: 1, 2, 3 Res. No. 25-9437 Full Cost: 714.15$
Public spa 595.00$ Yes Collected By: Full Cost: 595.13$ Building Division
Private pool 595.00$ Yes Full Cost: 595.13$ Private spa 476.00$ Yes Full Cost: 476.10$ Miscellaneous Charged By: Date: 4/29/2025 Objective: Recover Cost For each appliance or piece of 238.00$ Yes Building Division equipment regulated by the Plumbing Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Code but not classified in other appliance Collected By:
categories Building Division Full Cost: 238.05$
Reference: CMD 109 4 - 12
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
3-G GRADING PLAN REVIEW FEES Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
50 cubic yards or less No Fee Yes Res. No. 25-9437 Full Cost: -$ Collected By:
51 to 100 cubic yards 357.00$ Yes Building Division Full Cost: 357.08$ 101 to 1,000 cubic yards 952.00$ Yes Full Cost: 952.20$ 1,001 to 10,000 cubic yards 1,428.00$ Yes Full Cost: 1,428.30$ 10,001 to 100,000 cubic yards - base 2,380.00$ Yes Full Cost: 2,380.50$ Each additional 10,000 cubic yards 105.80$ Yes Full Cost: 105.80$ 100,001 to 200,000 cubic yards - base 3,332.00$ Yes Full Cost: 3,332.70$ Each additional 10,000 cubic yards 238.00$ Yes Full Cost: 238.05$ 200,001 cubic yards or more - base 5,713.00$ Yes Full Cost: 5,713.20$ Each additional 10,000 cubic yards 119.00$ Yes Full Cost: 119.03$ Reference: CMD 109 4 - 13
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
3-H GRADING PERMIT FEES Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
100 cubic yards or less 476.00$ Yes Res. No. 25-9437 Full Cost: 476.10$ Collected By:
101 to 1,000 cubic yards - base 476.00$ Yes Building Division Full Cost: 476.10$ Each additional 100 cubic yards 79.35$ Yes Full Cost: 79.35$ 1,001 to 10,000 cubic yards - base 1,190.00$ Yes Full Cost: 1,190.25$ Each additional 1,000 cubic yards 52.90$ Yes Full Cost: 52.90$ 10,001 to 100,000 cubic yards - base 1,666.00$ Yes Full Cost: 1,666.35$ Each additional 10,000 cubic yards 211.60$ Yes Full Cost: 211.60$ 100,001 cubic yards or more - base 3,570.00$ Yes Full Cost: 3,570.75$ Each additional 10,000 cubic yards 105.80$ Yes Full Cost: 105.80$ 3-I OTHER INSPECTIONS AND FEES Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division
Minimum Permit Fee per Trade 238.00$ Yes Res. No. 25-9437 Prop 26 Exception: 3 Collected By:

Building Division Full Cost: 238.05$
Inspections outside of normal business 308.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost hours (per hour) - (Min of 2 hours) Building Division
Res. No. 25-9437 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 309.47$
Reference: CMD 109 4 - 14
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Re-inspection fees assessed under 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost provisions of Section 305.8 (per hour) Building Division Res. No. 25-9437 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 238.05$
Inspections for which no fee is 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost specifically indicated (per hour) Building Division
Res. No. 25-9437 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 238.05$
Additional plan review required by 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost changes, additions or revisions to Building Division
approved plans (per hour) Res. No. 25-9437 Prop 26 Exception: 1, 3 Collected By:

Building Division Full Cost: 238.05$
For use of outside consultants for No Fee Yes Charged By: Date: 4/28/2020 Objective: Recover Cost plan checking and inspections Building Division
Res. No. Prop 26 Exception: 3
Collected By:

Building Division Full Cost: -$
Plan Review outside of normal business 308.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost hours (per hour) - (Min of 2 hours) Building Division
Res. No. 25-9437 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 309.47$
Reference: CMD 109 4 - 15
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Phased Plan Check 25% of original plan Yes Charged By: Date: 4/19/2022 Objective: Recover Cost (for each phase) review fee Building Division
Res. No. 22-9081 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 25% of PC
Master Plan Fee 25% of current plan Yes Charged By: Date: 4/29/2025 Objective: Recover Cost review fee Building Division
Res. No. 25-9437 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 25% of PC
Alternate Materials & Methods Review 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost (per hour) - (Minimum 3 hours) Building Division
Res. No. 25-9437 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 238.05$
Temporary Certificate of Occupancy 1,190.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division
Res. No. 25-9437 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 1,190.25$
Permit to Final (per trade) 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost (minimum 1-hour per trade) Building Division
Res. No. 25-9437 Prop 26 Exception: 3
Collected By:

Building Division Full Cost: 238.05$
Reference: CMD 109 4 - 16
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Application Extension 98.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected By:

Building Division Full Cost: 99.18$
Permit Extension 98.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 3
Collected By:

Building Division Full Cost: 99.18$
Replacement Permit 98.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: 99.18$
Addressing 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost (per hour - two hour minimum) Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: 238.05$
Plan Duplication of lost plan set 98.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost (up to 20 pages) Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: 99.18$
Reference: CMD 109 4 - 17
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Review and stamp transfer of lost plan 98.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost set Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected By:

Building Division Full Cost: 99.18$
Photovoltaic - Residential Charged By: Date: 6/22/2021 Objective: Recover Cost See Gov't Code 66015 15KW or less 450.00$ Yes Building Division Res. No. 21-8981 Prop 26 Exception: 1, 2, 3
Per KW above 15 15.00$ Yes Collected By:

Building Division Full Cost: Set by State
Photovoltaic - Commercial Charged By: Date: 6/22/2021 Objective: Recover Cost See Gov't Code 66015 50KW or less 1,000.00$ Yes Building Division Res. No. 21-8981 Prop 26 Exception: 1, 2, 3
Between 50KW and 250 KW (base) 1,000.00$ Yes Collected By:

Building Division
Full Cost: Set by State
Between 50KW and 250 KW (per KW) 7.00$ Yes Greater than 250 KW (base) 2,400.00$ Yes Greater than 250 KW (per KW) 5.00$ Yes Reference: CMD 109 4 - 18
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Photovoltaic - Solar Thermal Charged By: Date: 6/22/2021 Objective: Recover Cost See Gov't Code 66015 10kwth or less 450.00$ Yes Building Division Res. No. 21-8981 Prop 26 Exception: 1, 2, 3
Greater than 10kwth (base) 450.00$ Yes Collected By:

Building Division
Full Cost: Set by State
Per kwth above 10kwth 15.00$ Yes Bathroom Remodel (like for like) 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 238.05$
Foundation Repair / Seismic Upgrade 357.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 357.08$
Pool Demo 238.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 238.05$
Reference: CMD 109 4 - 19
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Residential Reroof 694.00$ Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Additional fees apply Building Division (e.g., permit issuance fee
Res. No. 25-9437 Prop 26 Exception: 1, 2 and technology fee) Collected By:

Building Division Full Cost: 695.52$
SINGLE-FAMILY / DUPLEX / Charged By: Date: 4/29/2025 Objective: Recover Cost ADDITIONAL DWELLING UNIT Building Division
RESIDENTIAL SCALED PERMIT FEE Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 PLAN CHECK Collected By:

Building Division
Project Size
1 to 250 sq. ft. 714.15$ Yes Full Cost: 714.15$ 251 to 1,000 sq. ft.

First 250 sq. ft. 714.15$ Yes Full Cost: 714.15$ Each additional 100 sq. ft. or 285.66$ Yes Full Cost: 285.66$ fraction thereof
1,001 to 3,000 sq. ft.

First 1,000 sq. ft. 2,856.60$ Yes Full Cost: 2,856.60$ Each additional 100 sq. ft. or 142.83$ Yes Full Cost: 142.83$ fraction thereof
3,001 to +
First 3,000 sq. ft. 5,713.20$ Yes Full Cost: 5,713.20$ Each additional 100 sq. ft. or 71.42$ Yes Full Cost: 71.42$ fraction thereof
Reference: CMD 109 4 - 20
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
INSPECTION Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division Prop 26 Exception: 1, 2, 3
Project Size Res. No. 25-9437
1 to 250 sq. ft. 792.71$ Yes Collected By: Full Cost: 792.71$ Building Division
251 to 1,000 sq. ft.

First 250 sq. ft. 792.71$ Yes Full Cost: 792.71$ Each additional 100 sq. ft. or 243.44$ Yes Full Cost: 243.44$ fraction thereof
1,001 to 3,000 sq. ft.

First 1,000 sq. ft. 2,618.55$ Yes Full Cost: 2,618.55$ Each additional 100 sq. ft. or 206.28$ Yes Full Cost: 206.28$ fraction thereof
3,001 to +
First 3,000 sq. ft. 6,743.96$ Yes Full Cost: 6,743.96$ Each additional 100 sq. ft. or 103.14$ Yes Full Cost: 103.14$ fraction thereof
Reference: CMD 109 4 - 21
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
COMMERCIAL / MULTI-FAMILY / Charged By: Date: 4/29/2025 Objective: Recover Cost INDUSTRIAL SCALED PERMIT FEE Building Division
PLAN CHECK Res. No. 25-9437 Prop 26 Exception: 1, 2, 3, 6 Collected By:

Project Valuation Building Division
$1 to $1,000 119.03$ Yes Full Cost: 119.03$ $1,001 to $10,000
First $1,000 119.03$ Yes Full Cost: 119.03$ Each additional $1,000 or fraction thereof 19.84$ Yes Full Cost: 19.84$ $10,001 to $75,000
First $10,000 297.56$ Yes Full Cost: 297.56$ Each additional $1,000 or fraction thereof 17.40$ Yes Full Cost: 17.40$ $75,001 to $150,000
First $75,000 1,428.30$ Yes Full Cost: 1,428.30$ Each additional $1,000 or fraction thereof 22.22$ Yes Full Cost: 22.22$ $150,001 to $750,000
First $150,000 3,094.65$ Yes Full Cost: 3,094.65$ Each additional $1,000 or fraction thereof 7.74$ Yes Full Cost: 7.74$ $750,001 to $3,000,000
First $750,000 7,736.63$ Yes Full Cost: 7,736.63$ Each additional $1,000 or fraction thereof 5.44$ Yes Full Cost: 5.44$ $3,000,001 to $10,000,000
First $3,000,000 19,996.20$ Yes Full Cost: 19,996.20$ Each additional $1,000 or fraction thereof 3.20$ Yes Full Cost: 3.20$ $10,000,001 to +
First $10,000,000 42,372.90$ Yes Full Cost: 42,372.90$ Each additional $1,000 or fraction thereof 1.59$ Yes Full Cost: 1.59$ Reference: CMD 109 4 - 22
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
INSPECTION PERMIT Charged By: Date: 4/29/2025 Objective: Recover Cost Building Division
Project Valuation Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 $1 to $1,000 119.03$ Yes Collected By: Full Cost: 119.03$ Building Division
$1,001 to $10,000
First $1,000 119.03$ Yes Full Cost: 119.03$ Each additional $1,000 or fraction thereof 39.58$ Yes Full Cost: 39.58$ $10,001 to $75,000
First $10,000 475.26$ Yes Full Cost: 475.26$ Each additional $1,000 or fraction thereof 21.98$ Yes Full Cost: 21.98$ $75,001 to $150,000
First $75,000 1,904.40$ Yes Full Cost: 1,904.40$ Each additional $1,000 or fraction thereof 25.39$ Yes Full Cost: 25.39$ $150,001 to $750,000
First $150,000 3,808.80$ Yes Full Cost: 3,808.80$ Each additional $1,000 or fraction thereof 9.52$ Yes Full Cost: 9.52$ $750,001 to $3,000,000
First $750,000 9,522.00$ Yes Full Cost: 9,522.00$ Each additional $1,000 or fraction thereof 4.23$ Yes Full Cost: 4.23$ $3,000,001 to $10,000,000
First $3,000,000 19,044.00$ Yes Full Cost: 19,044.00$ Each additional $1,000 or fraction thereof 3.95$ Yes Full Cost: 3.95$ $10,000,001 to +
First $10,000,000 46,657.80$ Yes Full Cost: 46,657.80$ Each additional $1,000 or fraction thereof 1.97$ Yes Full Cost: 1.97$ Reference: CMD 109 4 - 23
Department / Division: Community Development / Building Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Expedited Plan Review Service Additional 50% of Current Yes Charged By: Date: 4/29/2025 Objective: Recover Cost Plan Review Fee Building Division
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected By:

Building Division Full Cost: varies
Fee for Work Commencing Before Equal to Permit Fee No Charged By: Date: 4/19/2022 Objective: Penalty Permit Issuance Building Division
Res. No. 22-9081 Prop 26 Exception: 5
Collected By:

Building Division Full Cost:

Reference: CMD 109 4 - 24
Department / Division: Community Development / Housing & Community Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept /
Div Comments
Neighborhood Conservation Improvement 1,012.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Program (NCIP) Loan Application Fee HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 1,014.30$
Residential Loan Refinance / 1,821.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Subordinations all programs HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 1,825.74$
Multi-Family (MF) Loan Subordination 4,251.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Fee covers estimated Request Review Fee HCSD internal costs. Excess costs
Res. No. 25-9437 Prop 26 Exception: 2 will be billed.

Collected by:

HCSD Full Cost: 4,260.06$ Borrower will be responsible for all outside legal &
consulting fees, i.e., HTSV.

Loan Demand Payoff Fee - NCIP (through 1,315.00$ No Charged by: Date: 4/29/2025 Objective: User Fee For new loans title closings) HCSD effective 7/1/2018.

Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 1,318.59$
Loan Demand Payoff Fee - First-Time 1,315.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Homebuyer (FTHB) & Below Market HCSD
Purchase (BMP) Programs Res. No. 25-9437 Prop 26 Exception: 2 (through Title closings) Collected by:

HCSD Full Cost: 1,318.59$
Date Fee Last Changed
--------------
Ordinance / Resolution
Number & Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 5 - 1
Department / Division: Community Development / Housing & Community Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept /
Div Comments
Date Fee Last Changed
--------------
Ordinance / Resolution
Number & Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Loan Demand Payoff Fee 1,012.00$ No Charged by: Date: 4/29/2025 Objective: User Fee NCIP: only for new loans NCIP, FTHB, & BMP (for walk-ins) HCSD effective 7/1/2018.

Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 1,014.30$
Loan Demand Payoff Processing Fee - 809.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Multi-Family HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 811.44$
Multi-Family Monitoring Fee 131.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Fee targets less than full per unit HCSD cost recovery
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 202.86$
AHA Affordable Housing Agreements - 4,352.00$ No Charged by: Date: 4/29/2025 Objective: User Fee BMP For Sale per Agreement HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 4,361.49$
Affordable Housing Application Fee Charged by: Date: 4/18/2023 Objective: User Fee HCSD
BMP Affordable Housing Application 500.00$ No Res. No. 23-9221 Prop 26 Exception: 2 Processing Fee per application Collected by:

HCSD Full Cost: 500.00$
Reference: CMD 109 5 - 2
Department / Division: Community Development / Housing & Community Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept /
Div Comments
Date Fee Last Changed
--------------
Ordinance / Resolution
Number & Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
AHA Affordable Housing Agreement - 6,073.00$ No Charged by: Date: 4/29/2025 Objective: User Fee MF for Rental per Agreement HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 6,085.80$
AHA Affordable Housing Agreement - 2,226.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Amendments per Agreement HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 2,231.46$
Multi-Family Transaction Application 1,012.00$ No Charged by: Date: 4/29/2025 Objective: User Fee This amount shall be deducted Review Fee HCSD from the total fees at closing
Res. No. 25-9437 Prop 26 Exception: 2 (i.e., refinancing, Collected by: recapitalization, etc.)
HCSD Full Cost: 1,014.30$
Multi-Family Loan Conversion Fee 8,097.00$ No Charged by: Date: 4/29/2025 Objective: User Fee HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 8,114.40$
Multi-Family Loan Origination Fee 60,740.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Fee is a not-to-exceed amount HCSD and may vary with staff time.

Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 60,858.00$
Reference: CMD 109 5 - 3
Department / Division: Community Development / Housing & Community Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept /
Div Comments
Date Fee Last Changed
--------------
Ordinance / Resolution
Number & Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Multi-Family Loan Recapitalization Fee 48,591.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Fee is a not-to-exceed amount HCSD and may vary with staff time.

Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 48,686.40$
Multi-Family Project Restructuring Fee - 16,196.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Fee is a not-to-exceed amount Transfer of Ownership (New Parties) HCSD and may vary with staff time.

Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 16,228.80$
Multi-Family Project Restructuring Fee - 12,147.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Transfer of Ownership (Related Parties) HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 12,171.60$
Multi-Family Project Refinance Fee 24,295.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Fee is a not-to-exceed amount HCSD and may vary with staff time.

Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 24,343.20$
Loan Demand Payoff Fee 100.00$ No Charged by: Date: 4/29/2025 Objective: User Fee

NCIP, FTHB & BMP HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 101.43$
Reference: CMD 109 5 - 4
Department / Division: Community Development / Housing & Community Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept /
Div Comments
Date Fee Last Changed
--------------
Ordinance / Resolution
Number & Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Affordable Housing Application Fee - 77.00$ No Charged by: Date: 4/29/2025 Objective: User Fee

BMP HCSD
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 507.15$
New Owner BMP Processing and 2.5% of sales price No Charged by: Date: 4/23/2024 Objective: User Fee Paid by developer Transaction Fees per unit HCSD
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 16,228.80$
Resale - BMP Processing and Transaction 2.5% of sales price No Charged by: Date: 4/23/2024 Objective: User Fee Paid by seller and buyer 50/50 Fee per unit HCSD
Res. No. 24-9316 Prop 26 Exception: 2
Collected by:

HCSD Full Cost: 16,228.80$
Development Impact Fees Charged by: Date: 4/29/2025 Objective: Impact Inflate annually by Feb - Feb Affordable Housing Fees HCSD Development change in regional BCI SCMC Res. No. 25-9437 Fee 17.40.060.

For Sale Residential Per Square Foot Collected by:

Single Family Home 45.72$ No HCSD Prop 26 Exception: 6 Townhome 38.09$ No Full Cost: -$ Condominium 30.48$ No
Development Impact Fees Charged by: Date: 4/29/2025 Objective: Impact Inflate annually by Feb - Feb Affordable Housing Fees HCSD Development change in regional BCI SCMC Res. No. 25-9437 Fee 17.40.060.

Rental Residential Per Square Foot Collected by:

Any Tenure Type 30.48$ No HCSD Prop 26 Exception: 6 Full Cost: -$
Reference: CMD 109 5 - 5
Department / Division: Community Development / Housing & Community Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept /
Div Comments
Date Fee Last Changed
--------------
Ordinance / Resolution
Number & Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Development Impact Fees Charged by: Date: 4/29/2025 Objective: Impact 1. Office including Industrial Affordable Housing Fees HCSD Development Office, R&D and Commercial Res. No. 25-9437 Fee Office
Non-Residential Projects Per Square Foot Collected by:

Retail < 5,000 sf No Fee No HCSD Prop 26 Exception: 6 2. Low-Intensity Uses such as Data Centers and Warehouses
Retail ≥ 5,000 sf 7.62$ No Full Cost: -$ Hotel 7.62$ No Inflate annually by Feb - Feb change in regional BCI SCMC
Office¹ < 20,000 sf 15.24$ No 17.40.060.

Office¹ ≥20,000 sf 30.48$ No Other Commercial 7.62$ No Light Industrial < 20,000 sf 7.62$ No Light Industrial ≥20,000 sf 15.24$ No Low-Intensity Uses² 3.05$ No Late Payment Penalty for Multi-Family 25% of Monitoring No Charged by: Date: 4/29/2025 Objective: Penalty 30 days after due date Monitoring Fee Fee HCSD
Res. No. 25-9437 Prop 26 Exception: 5
Collected by:

HCSD Full Cost: N/A
Reference: CMD 109 5 - 6
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Rezoning Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 3
Rezone Single Lot to R1 9,478.00$ Yes Development Res. No. 25-9437 Full Cost: 12,213.00$ per application
Collected by:

Non-Planned Development (PD) 21,519.00$ Yes Finance Full Cost: 22,899.38$ Developer specific Planned Development (PD) 61,065.00$ Yes Full Cost: 61,065.00$ Developer specific Development Area Plan Related to a 39,692.00$ Yes Full Cost: 39,692.25$ PD-MC Rezoning
Zoning Clearance Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
Zoning Clearance for Home Occupancy 305.00$ Yes Development Res. No. 25-9437 Full Cost: 305.33$ Zoning Clearance for Live Entertainment 305.00$ Yes Collected by: Full Cost: 305.33$ and Outdoor Dining (up to 24 seats) Finance
Zoning Clearance - Single Family 305.00$ Yes Full Cost: 305.33$ Adding to fee schedule for enhanced clarity.

Zoning Clearance - ABC or DMV Review 305.00$ Yes Full Cost: 305.33$ Zoning Clearance - Mobile Food Vendor 610.00$ Yes Full Cost: 610.65$ Other, Non-Single Family
Zoning Code Text Amendment 27,479.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Developer specific per application Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 27,479.25$
Finance
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 6 - 1
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Variance - Single Family 3,622.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Below cost recovery to per application Community encourage single-family
Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 planning Collected by: Full Cost: 18,319.50$
Finance
Variance - All Others 10,769.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost per application Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by: Full Cost: 18,319.50$
Finance
Minor Modifications Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
Single Family 610.00$ Yes Development Res. No. 25-9437 Full Cost: 610.65$ All Others 1,526.00$ Yes Collected by: Full Cost: 1,526.63$ Finance
Reference: CMD 109 6 - 2
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Off-Site Parking Permit (Citywide) 1,526.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Community
Off-Site Parking Permit (Events north of 1,526.00$ Yes Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Subject to April PCI 101) per permit, per year for figure to be effective July 1 events north of 101 Collected by: Full Cost: 1,526.63$ each year Finance
AND
Collected from persons
Off-Site Parking Facilities (Events north of 6.94$ No Date: 4/29/2025 Objective: Recover Cost obtaining off-site parking 101) per space, per event permit from Zoning
north of 101 Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Administrator and for each parking space for sports
Full Cost: or entertainment venues
north of Highway 101.

Use Permit Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 3
Use Permit - Standard 15,063.00$ Yes Development Res. No. 25-9437 Full Cost: 24,426.00$ per application
Collected by:

Use Permit - Minor (Single Family) 1,229.00$ Yes Finance Full Cost: 12,213.00$ per application
Use Permit - Minor (All Other) 6,508.00$ Full Cost: 12,213.00$ per application
Reference: CMD 109 6 - 3
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Temporary Use Permit Objective: Recover Cost
Prop 26 Exception: 3
Temporary Use Permit - Planning 3,053.00$ Yes Charged by: Date: 4/29/2025 Full Cost: 3,053.25$ Commission Referral per application Community
Development Res. No. 25-9437
Temporary Use Permit - Administrative 287.00$ Yes Full Cost: 3,053.25$ Approval (Non Profit) Collected by:

Finance
Temporary Use Permit - Administrative 1,526.00$ Yes Full Cost: 1,526.63$ Approval
Maps Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3, 6
4 or Fewer Lots 18,319.00$ Yes Development Res. No. 25-9437 Full Cost: 18,319.50$ 5 or More Lots 24,426.00$ Yes Collected by: Full Cost: 24,426.00$ Finance
Lot Line Adjustment 6,106.00$ Yes Full Cost: 6,106.50$ per application
Appeals Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2
From Non-Applicant Resident 541.00$ Yes Development Res. No. 25-9437 Full Cost: 24,426.00$ Below cost recovery to per request encourage single-family
Collected by: planning
All Others 10,848.00$ Yes Finance Full Cost: 24,426.00$ Mailed Notices (2x) Charged by: Date: 4/29/2025 Objective: Recover Cost a) Beginning of Project Actual Cost No Community Prop 26 Exception: 1, 2 Development Res. No. 25-9437 Full Cost: varies
b) Prior to Completion Actual Cost No
Collected by: Full Cost: varies
Finance
Reference: CMD 109 6 - 4
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reposting of Public Notification Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2
Single Family 134.00$ Yes Development Res. No. 25-9437 Full Cost: 1,221.30$ Below cost recovery to per application encourage single-family
Collected by: planning
Non-Single Family 1,221.00$ Yes Finance Full Cost: 1,221.30$ per application
Re-Noticing in Newspaper At Cost Yes Full Cost: Cost
Annexation of Territory to City of 42,745.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Santa Clara per application Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 3, 6 Developer Specific
Collected by: Full Cost: 42,745.50$
Finance
Reference: CMD 109 6 - 5
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Architectural Review Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
Over the Counter -$ Yes Development Res. No. 25-9437 Full Cost: 152.66$ Accessory Dwelling Unit / Junior 305.00$ Yes Collected by: Full Cost: 305.33$ Accessory Dwelling Unit Finance
Minor Amendment to Approved Project
a) Single Family 305.00$ Yes Full Cost: 915.98$ Below cost recovery to b) All Other 915.00$ Yes Full Cost: 915.98$ encourage single-family planning
Single Family Residential Going to DRH 1,229.00$ Yes Full Cost: 12,213.00$ Below cost recovery to encourage single-family
New Development - Non-SFR 36,639.00$ Yes Full Cost: 36,639.00$ planning SB 9 Review 916.00$ Yes Full Cost: 1,831.95$ SB 35 Review 24,426.00$ Yes Full Cost: 24,426.00$ Design Consultant Review Deposit of consultant Yes Full Cost: -$ estimated costs, plus
citywide overhead
Reference: CMD 109 6 - 6
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Environmental Review Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
City Review of Draft EIR and Preparation 36,639.00$ Yes Development Res. No. 25-9437 Full Cost: 36,639.00$ of Final EIR per application
Collected by:

City Review of Supplemental EIR / 18,319.00$ Yes Finance Full Cost: 18,319.50$ Final EIR
City Review of NEPA 18,319.00$ Yes Full Cost: 18,319.50$ Adding to fee schedule for enhanced clarity
City Review or Preparation of Initial Study / 24,426.00$ Yes Full Cost: 24,426.00$ MND and Negative Declaration per application
Exemption 915.00$ Yes Full Cost: 915.98$ Exemption (SFR or Paperless) -$ Yes Full Cost: 152.66$ Recordation of Exemption (NOE) 610.00$ Yes Full Cost: 610.65$ AB 52 Tribal Consultation 915.00$ Yes Full Cost: 915.98$ Re-Use of Prior Environmental 1,831.00$ Yes Full Cost: 1,831.95$ Determination
Addendum to Prior Environmental 4,885.00$ Yes Full Cost: 4,885.20$ Determination
Reference: CMD 109 6 - 7
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
General Plan Amendment Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 6
Single Family 3,080.00$ Yes Development Res. No. 25-9437 Full Cost: 12,213.00$ Up to One Acre 24,426.00$ Yes Collected by: Full Cost: 24,426.00$ Developer Specific per application Finance
One to Five Acres 36,639.00$ Yes Full Cost: 36,639.00$ Over Five Acres 42,745.00$ Yes Full Cost: 42,745.50$ Development Agreement 36,639.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Developer Specific per application Community Prop 26 Exception: 1, 2, 6
Development Res. No. 25-9437 Full Cost: 36,639.00$
Amendment or Cancellation of 12,213.00$ Yes Development Agreement per application Collected by: Full Cost: 12,213.00$ Finance
Development Agreement Negotiations Actual Cost No Full Cost: Cost Certificate of Compliance 2,442.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost per certificate Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 6 Collected by: Full Cost: 2,442.60$
Finance
Reference: CMD 109 6 - 8
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Signs Charged by: Date: 4/29/2025 Objective: Recover Cost Sign Permit Fees (attached or ground) 360.00$ Yes Community Prop 26 Exception: 3 for First Sign per application Development Res. No. 25-9437 Full Cost: 610.65$ Temporary Sign Permit / Street Banner 87.00$ Yes Collected by: Full Cost: 152.66$ (Pursuant to Zoning Ordinance Sec 40-27); per application Finance Good for 60 Days; or ea. Additional Sign
Under a Sign Permit Application
Temporary Sign Removal Fees 152.00$ Yes Full Cost: 152.66$ Fees to be paid prior to per sign retrieval of signs to any
person.

Comprehensive Sign Program 4,579.00$ Yes Full Cost: 4,579.88$ Mills Act Application 8,746.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost per application Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 12,213.00$
Finance
Charged by: Date: 4/29/2025 Objective: Recover Cost
Mills Act Plaque Community Prop 26 Exception: 1, 2
a) Small Actual Cost No Development Res. No. 25-9437 Full Cost: varies b) Large Actual Cost No Collected by: Full Cost: varies Finance
Reference: CMD 109 6 - 9
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Pre-Application Charged by: Date: 4/29/2025 Objective: Recover Cost Pre-Application fee credited Community Prop 26 Exception: 1, 2, 3, 6 toward cost of full application Single Family 540.00$ Yes Development Res. No. 25-9437 Full Cost: 2,442.60$ fee if submitted within 3 months after completion of
Planning Review 3,613.00$ Yes Collected by: Full Cost: 4,885.20$ preliminary review.

Finance
Project Clearance Committee 6,106.00$ Yes Full Cost: 6,106.50$ SB 330 Review 6,106.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Adding to fee schedule for Community enhanced clarity
Development Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 6,106.50$
Finance
Flood Zone Verification 305.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 305.33$
Finance
Zoning Verification 525.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 915.98$
Finance
Reference: CMD 109 6 - 10
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Historical & Landmarks Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2 Below cost recovery
Single Family 1,014.00$ Yes Development Res. No. 25-9437 Full Cost: 9,159.75$ to encourage historical designation
All Others 4,580.00$ Yes Collected by: Full Cost: 9,159.75$ Finance
Stormwater Management Plan 915.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Review Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 915.98$
Finance
Tree Removal Permit Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2 Below cost recovery to Single Family Residence 305.00$ Yes Development Res. No. 25-9437 Full Cost: 610.65$ encourage single-family planning
All Others 610.00$ Yes Collected by: Full Cost: 610.65$ Finance
Heritage Tree Removal 861.00$ Yes Full Cost: 2,442.60$ Below cost recovery to encourage single-family
planning
Contract Administration Actual Cost No Charged by: Date: 6/22/2021 Objective: Recover Cost Community
Development Res. No. 21-8981 Prop 26 Exception: 1, 2
Collected by: Full Cost: Actual Cost
Finance
Reference: CMD 109 6 - 11
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
In-House Planning Rate for Services 305.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Provided and Not Listed Elsewhere Community
in this Schedule (per hour) Development Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by: Full Cost: 305.33$
Finance
Preparation or Peer Review of Technical Pass-Through of Actual No Charged by: Date: 4/23/2024 Objective: Recover Cost Report Cost plus 10% Community
Admin Fee Development Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by: Full Cost: Actual Cost
Finance
Time Extensions Charged by: Date: 4/29/2025 Objective: Recover Cost Community
Administrative Entitlement Extension 305.00$ No Development Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by: Full Cost:

Finance
Code Enforcement Re-Inspection Fee 286.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by: Full Cost: 288.77$
Finance
Reference: CMD 109 6 - 12
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Short-Term Rental Permit Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
New 385.00$ Yes Development Res. No. 25-9437 Full Cost: 385.00$ Renewal 385.00$ Yes Collected by: Full Cost: 385.00$ Finance
Significant Property Alteration Charged by: Date: 4/29/2025 Objective: Recover Cost Applies to historic Community Prop 26 Exception: 1, 2, 3 preservation properties only.

Major - Single Family 1,014.00$ Yes Development Res. No. 25-9437 Full Cost: 12,213.00$ Subject to Historical & Landmark Commission
Major - Other 12,213.00$ Yes Collected by: Full Cost: 12,213.00$ approval.

Finance
Significant Property Alteration Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 3
Minor - Single Family 676.00$ Yes Development Res. No. 25-9437 Full Cost: 9,159.75$ Applies to historic preservation properties only.

Minor - Other 2,151.00$ Yes Collected by: Full Cost: 9,159.75$ Finance
Transportation Demand Management Fee 2,992.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Community
Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by: Full Cost: 2,992.60$
Finance
Reference: CMD 109 6 - 13
Department / Division: Community Development / Planning Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Specific Plan Fee - Lawrence Station Charged by: Date: 4/29/2025 Objective: Recover Cost Fees adjusted annual using Area Plan (LSAP) Community December CPI factor from
Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 previous year.

Phase I Developers 24,989.49$ No
per acre Collected by: Full Cost: 1,080,148.77$ Fees collected at the time of Finance Building Permit Application
Phase II Developers 15,980.82$ No
per acre
Specific Plan Fee- Tasman East 316.17$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Fees adjusted annual using Specific Plan Area (TESP) per unit Community December CPI factor from Development Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 previous year.

Collected by: Full Cost: 1,256,824.31$ Fees collected prior to Finance Architectural Committee
Review.

Patrick Henry Drive CFD Formation Charged by: Date: 4/29/2025 Objective: Recover Cost Community Prop 26 Exception: 1, 2, 6
Applications Received Before July 1, 2023 839.19$ No Development Res. No. 25-9437 Fee due prior to issuance of Certificate per acre Full Cost: 62,100.00$ of Occupancy Collected by: Full Cost (per acre): 839.19$ Finance
Applications Received On/After July 1, 839.19$ No 2023, fee due prior to issuance of per acre
Certificate of Occupancy
Reference: CMD 109 6 - 14

Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Overhead Lines - New 1,386.91$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Single Family/Residential per lot Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 1,386.91$
Overhead Lines - New 852.92$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Multiple Units per unit Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 852.92$
Overhead Lines - New 8.59$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Street Lighting per front foot Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 8.59$
Underground - New 2,734.60$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Single Family/Residential per lot Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 3,928.08$
Underground - New 2,324.41$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Multiple Units/Residential per unit Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 3,338.87$
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 7 - 1
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Underground - New 21.11$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Street Lighting per front foot Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 21.11$
Underground - Existing 4,016.92$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Single Family per lot Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 4,016.92$
Underground - Existing 2,147.11$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Multi-Units per unit Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 2,147.11$
Underground - Existing 31.37$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Street Lighting per front foot Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2, 6
Collected by:

Finance Full Cost: 31.37$
Reference: CMD 109 7 - 2
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Load Development Charged by: Date: 4/29/2025 Objective: Recover Cost Fees will be updated via Facilities < 12kV 630.39$ No Electric Utility separate study. per kVA Res. No. 25-9437 Prop 26 Exception: 6
Collected by:

Commercial Facilities 12kV 526.75$ No Finance Full Cost: See per kVA Comments
Customer Facilities 653.18$ No
Dedicated 12kV per kVA
Customer Facilities 608.82$ No
Dedicated 60kV per kVA
Temporary Connection to Pole 825.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 825.93$
Temporary Power Actual labor, No Charged by: Date: 4/23/2024 Objective: Recover Cost materials and Electric Utility
equipment costs, Res. No. 24-9316 Prop 26 Exception: 1, 2 including overhead Collected by:

Finance Full Cost: Actual Cost
Underground Street Light Relocation Actual labor, No Charged by: Date: 4/29/2025 Objective: Recover Cost materials and Electric Utility
equipment costs, Res. No. 25-9437 Prop 26 Exception: 1, 2 including overhead Collected by:

Finance Full Cost: Actual Cost
Reference: CMD 109 7 - 3
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Service Wire Relocation from Mid-Span 4,333.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 4,334.32$
Service Wire Relocation from Pole 1,388.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 1,388.97$
Meter Test Deposit 246.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance / Full Cost: 246.33$
Municipal Serv.

Service Wire Relocation Actual labor, No Charged by: Date: 6/22/2021 Objective: Recover Cost Additional Linework materials and Electric Utility
Includes: equipment costs, Res. No. 21-8981 Prop 26 Exception: 1, 2 Labor Costs including overhead Collected by:

Material Costs Finance Full Cost: As calculated
Equipment Costs
Electric System Damage Actual labor, No Charged by: Date: 6/22/2021 Objective: Recover Cost Includes: materials and Electric Utility
Labor Costs equipment costs, Res. No. 21-8981 Prop 26 Exception: 1, 2 Material Costs including overhead Collected by:

Equipment Costs Finance Full Cost: As calculated
Reference: CMD 109 7 - 4
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Service Reconnection Residential 205.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance / Full Cost: 206.48$
Municipal Serv.

Service Disconnection Residential 205.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance / Full Cost: 206.48$
Municipal Serv.

Electric Reconnection Fee - 137.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Non-Residential Electric Utility Penalty
Res. No. 25-9437 Prop 26 Exception: 1, 2, 5
Collected by:

Finance / Full Cost: 137.66$
Municipal Serv.

Electric Disconnection Fee - 137.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Non-Residential Electric Utility Penalty
Res. No. 25-9437 Prop 26 Exception: 1, 2, 5
Collected by:

Finance / Full Cost: 137.66$
Municipal Serv.

Service Fee Customer- 275.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Owned Equipment Problem per hour Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 275.31$
Reference: CMD 109 7 - 5
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Electric replacement / reconnection fee 275.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost due to meter tampering / illegal access per account Electric Utility Penalty Fee to fix meter plus Res. No. 25-9437 Prop 26 Exception: 1, 2, 5 two (2) times estimated Collected by:
cost of services used Finance / Electric Rules and Full Cost: 275.31$ Municipal Serv. Regulations #7B
Service Removal Actual labor, No Charged by: Date: 4/29/2025 Objective: Recover Cost materials and Electric Utility
equipment costs, Res. No. 25-9437 Prop 26 Exception: 1, 2 including overhead Collected by:

Finance Full Cost: Actual Cost
Engineering Plan Check - Electric 468.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost For reviewing Encroachment (per sheet) - Includes 3 checks per sheet Electric Utility Permit plans that have no Res. No. 25-9437 Prop 26 Exception: 2, 3 electric services request.

Collected by: For conflicts with existing
Finance Full Cost: 469.11$ electric infrastructure.

Engineering Plan Check - Electric 66.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost For reviewing Encroachment (per sheet) - 4th and subsequent per sheet Electric Utility Permit plans that have no review Res. No. 25-9437 Prop 26 Exception: 2, 3 electric services request.

Collected by: For conflicts with existing
Finance Full Cost: 67.02$ electric infrastructure.

Project Clearance Committee / 866.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Sub Committee review Electric Utility
Res. No. 25-9437 Prop 26 Exception: 2, 3
Collected by:

Finance Full Cost: 866.30$
Reference: CMD 109 7 - 6
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Time of Use Meter Installation - 459.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Residential per meter Electric Utility
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance / Full Cost: 459.81$
Municipal Serv.

Time of Use Meter Installation - 672.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Non-Residential per meter Electric Utility
Res. No. 25-9437 Prop 26 Exception: 2, 3
Collected by:

Finance / Full Cost: 673.30$
Municipal Serv.

Field Marking-Fiber 155.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Up to 50 ft of excavation Electric Utility
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 155.25$
Field Marking-Fiber 103.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Over 50 ft. of excavation per each additional Electric Utility 50 ft. of excavation Res. No. 25-9437 Prop 26 Exception: 2 Collected by:

Finance Full Cost: 103.50$
Electric equipment relocation Actual labor, No Charged by: Date: 4/29/2025 Objective: Recover Cost Per Electric Rules and materials and Electric Utility Regulations Section 6.C
equipment costs, Res. No. 25-9437 Prop 26 Exception: 2
including overhead Collected by:

Finance Full Cost: Actual Cost
Reference: CMD 109 7 - 7
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
SVP System Impact Study - 84,249.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Transmission System Electric Utility
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

CAISO System Impact Study 139,518.00$ No Finance Full Cost: See Total cost with CAISO Inter- Comment connection Study if required.

SVP System Impact Study - 16,767.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Distribution 12kV system Electric Utility
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 16,853.94$
SVP Generation Interconnection Study 16,767.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Electric Utility
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 16,853.94$
Distribution Pole Contact - Application
Fee
254. 04$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Resolution #16-8285 per pole in application Electric Utility Under CA Public Utilities Code 2.5% annual escalation per Res. No. 25-9437 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the amount allowable under PU
Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Reference: CMD 109 7 - 8
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Distribution Pole Contact - Cable 18.96$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Resolution #16-8285 Attachment per each attachment Electric Utility Under CA Public Utilities Code 2.5% annual escalation per Res. No. 25-9437 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU
Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Distribution Pole Contact - Equipment 53.82$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Resolution #16-8285 Attachment per each attachment Electric Utility Under CA Public Utilities Code 2.5% annual escalation per Res. No. 25-9437 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU
Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Distribution Pole Contact - Riser 39.85$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Resolution #16-8285 Attachment per each attachment Electric Utility Under CA Public Utilities Code 2.5% annual escalation per Res. No. 25-9437 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU
Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Reference: CMD 109 7 - 9
Department / Division: Electric Utility Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Distribution Pole Contact - Anchor 3.70$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Resolution #16-8285 Attachment per each attachment Electric Utility Under CA Public Utilities Code 2.5% annual escalation per Res. No. 25-9437 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU
Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Distribution Pole Contact - Small Cell 96.43$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Resolution #16-8285 per each contact Electric Utility Under CA Public Utilities Code 2.5% annual escalation per Res. No. 25-9437 Sections 9510-9520 Resolution.

Collected by:

Finance Prop 26 Exception: 2 "Full Cost" represents the

2.5% annual escalation amount allowable under PU
Full Cost: See Code Sections 9510-9520
Comments which were created AB1027
Reference: CMD 109 7 - 10

Department / Division: Finance / Municipal Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Business Tax Charged by: Date: 4/29/2025 Objective: User Fee The surcharge for apartment Rental Unit Surcharge 3.16$ No Finance rental mediation was Apartments with 3+ Units per unit, per year Res. No. 25-9437 Prop 26 Exception: 1, 2 previously presented with the Collected by: Apartment Rental Unit
Finance - Muni Full Cost: 3.47$ Business Tax. Because the Services - surcharge is a fee rather
Business Tax than a tax, it remains in the
Municipal Fee Schedule.

Delinquent payment of 25% of appropriate No Charged by: Date: 11/8/2022 Objective: Penalty The Business Tax schedule is business - 30 days after due date business license Finance posted online at the City of tax Res. No. 22-9130 Prop 26 Exception: 5 Santa Clara's Finance - Collected by: Business Tax & License page.

Finance - Muni Full Cost: N/A
Services -
Business Tax
Change of name, address or 13.00$ No Charged by: Date: 4/23/2024 Objective: User Fee
business type as shown on per each update Finance
current certificate Res. No. 24-9316 Prop 26 Exception: 1, 2 Collected by:

Finance - Muni Full Cost: 13.63$
Services -
Business Tax
Business Certificate Info. Actual Cost of No
Charged by: Date: 6/11/1996 Objective: User Fee
Special Request Compilation Finance
(Research Required) Res. No. Prop 26 Exception: 1, 2
Collected by:

Finance - Muni Full Cost: Actual Cost
Services -
Business Tax
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 8 - 1
Department / Division: Finance / Municipal Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Duplicate business certificate 13.00$ No Charged by: Date: 4/23/2024 Objective: User Fee each Finance
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Finance - Muni Full Cost: 13.63$
Services -
Business Tax
Amplified Music Permit 81.00$ No Charged by: Date: 4/29/2025 Objective: User Fee Finance
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: City Code Section:

Finance 9.05.060 (c) (2) Full Cost: 81.77$
City Flag Actual Cost No Charged by: Date: Objective: Recover Cost City Council Approved Policy Finance 7/20/1993.

Res. No. Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: Actual Cost
Block Party Request No Charge No Charged by: Date: 6/15/2010 Objective: User Fee Fee waived to promote Finance community spirit.

Res. No. Prop 26 Exception: N/A
Collected by:

Finance Full Cost: 81.77$
Utility service deposit - commercial, Estimated three (3) No Charged by: Date: 8/9/1966 Objective: Recover Cost industrial and residential month's usage based Municipal Serv on history and / or Res. No. Prop 26 Exception: 1, 2
projected load Collected by:

Municipal Serv Full Cost: As calculated
Reference: CMD 109 8 - 2
Department / Division: Finance / Municipal Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Service turn-on fee (for each service) Charged by: Date: 4/29/2025 Objective: Recover Cost Municipal Serv
Electric 49.00$ No Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by:

Water 49.00$ No Municipal Serv Full Cost: 50.48$ Billing service charge for late payment - 15.00$ No Charged by: Date: 4/23/2024 Objective: Recover Cost residential, commercial and industrial or 1.5% per account, Municipal Serv Penalty whichever greater Res. No. 24-9316 Prop 26 Exception: 1, 2, 5 Collected by:

Municipal Serv Full Cost: 16.04$
Delinquent Service Letter 56.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost (48 hour notice) per account Municipal Serv Penalty
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Municipal Serv Full Cost: 57.27$
Fees for the verification of 152.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost electric meter address (aka "ring out") per address Municipal Serv plus Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

5.00$ No Municipal Serv Full Cost: 152.49$ * Per meter full cost is $12 per meter *
Utility Billing Splitting 169.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost or Combining Accounts per account Municipal Serv
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Municipal Serv Full Cost: 169.74$
Reference: CMD 109 8 - 3
Department / Division: Finance / Municipal Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Municipal Services Information Charged by: Date: 6/12/2001 Objective: Recover Cost Municipal Serv
Special Request (Request Research) Actual Cost of No Res. No. Prop 26 Exception: 1, 2 Compilation Collected by:

Municipal Serv Full Cost: Actual Cost
10-day letter for house meter for up to 143.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost 10 units Municipal Serv
Res. No. 25-9437 Prop 26 Exception: 1, 2
For each full or partial increment of 22.00$ No Collected by:
10 thereafter Municipal Serv Full Cost: 144.56$
Meter reading more than once per month 98.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost 1st meter per location Municipal Serv
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Municipal Serv Full Cost: 98.50$
Delinquent Reconnect Fee 85.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost per account Municipal Serv Penalty
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Municipal Serv Full Cost: 85.91$
Reference: CMD 109 8 - 4

Department / Division: Fire / Training Fee Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Training Fee Charged by: Date: 4/29/2025 Objective: Recover Cost CPR – Adult Heart Saver (4 Hours) 1,403.00$ No Fire / Training User Fee per 6 persons Res. No. 25-9437 Prop 26 Exception: N/A * Collected by:

Fire / Training Full Cost: 1,403.72$
Training Fee Charged by: Date: 4/29/2025 Objective: Recover Cost CPR – Adult / Pediatric Heart Saver 1,964.00$ No Fire / Training User Fee (6 Hours) per 6 persons Res. No. 25-9437 Prop 26 Exception: N/A * Collected by:

Fire / Training Full Cost: 1,965.21$
Training Fee Charged by: Date: 4/29/2025 Objective: Recover Cost First Aid (4 Hours) 1,403.00$ No Fire / Training User Fee per 6 persons Res. No. 25-9437 Prop 26 Exception: N/A * Collected by:

Fire / Training Full Cost: 1,403.72$
Training Fee Charged by: Date: 4/29/2025 Objective: Recover Cost PALS / ACLS Recognition (2 Days) 3,173.00$ No Fire / Training User Fee per 6 persons Res. No. 25-9437 Prop 26 Exception: N/A * Collected by:

Fire / Training Full Cost: 3,174.00$
Training Fee Charged by: Date: 4/29/2025 Objective: Recover Cost PALS / ACLS Re-Recognition (1 Day) 1,586.00$ No Fire / Training User Fee per 6 persons Res. No. 25-9437 Prop 26 Exception: N/A * Collected by:

Fire / Training Full Cost: 1,587.00$
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 9 - 1
Department / Division: Fire / Training Fee Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Training Fee Charged by: Date: 4/29/2025 Objective: Recover Cost Fire Extinguisher Training (2 Hours) 426.00$ No Fire / Training User Fee Does not include fees for fire extinguisher Limit 12 persons Res. No. 25-9437 Prop 26 Exception: N/A * use. Collected by:

Fire / Training Full Cost: 427.20$
Training Fee Charged by: Date: 4/29/2025 Objective: Recover Cost Safety and Evacuation Lecture (2 Hours) 460.00$ No Fire / Training User Fee Limit 20 persons Res. No. 25-9437 Prop 26 Exception: N/A * Collected by:

Fire / Training Full Cost: 461.35$
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 9 - 2
Department / Division: Fire / Rental and Resource Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Facility Rental Fee Charged by: Date: 4/29/2025 Objective: User Fee Headquarters’ Conference Room Rental 215.00$ No Fire per hour Res. No. 25-9437 Prop 26 Exception: 4
Collected by:

Fire / Full Cost: 215.80$
Administration
Facility Rental Fee Charged by: Date: 4/29/2025 Objective: User Fee Training Center: Classroom 215.00$ No Fire (Limit 80 persons) per hour Res. No. 25-9437 Prop 26 Exception: 4 Collected by:

Fire / Full Cost: 215.80$
Administration
Facility Rental Fee Charged by: Date: 4/29/2025 Objective: User Fee Training Center: Classroom 215.00$ No Fire (Limit 30 persons) per hour Res. No. 25-9437 Prop 26 Exception: 4 Collected by:

Fire / Full Cost: 215.80$
Administration
Facility Rental Fee Charged by: Date: 4/29/2025 Objective: User Fee Training Center: Classroom 215.00$ No Fire (Limit 20 persons) per hour Res. No. 25-9437 Prop 26 Exception: 4 Collected by:

Fire / Full Cost: 215.80$
Administration
Facility Rental Fee Charged by: Date: 4/29/2025 Objective: User Fee Training Center: Drill Grounds / Tower 215.00$ No Fire per hour Res. No. 25-9437 Prop 26 Exception: 4
Collected by:

Fire / Full Cost: 215.80$
Administration

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 3
Department / Division: Fire / Rental and Resource Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Resource Fees Charged by: Date: 4/29/2025 Objective: User Fee Stand-by 540.00$ No Fire
(One Engine for Permitted Activity) per hour Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by:

Fire / Full Cost: 541.05$
Administration
Resource Fees Charged by: Date: 4/29/2025 Objective: User Fee Fire Watch (Per Person) 292.00$ No Fire per hour Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Fire / Full Cost: 292.91$
Administration
Resource Fees Charged by: Date: 4/29/2025 Objective: User Fee Water Clean-up – Industrial and 551.00$ No Fire Commercial (1 Engine) per hour Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by:

Fire / Full Cost: 551.66$
Administration
Resource Fees Charged by: Date: 4/29/2025 Objective: User Fee Water Clean-up – Industrial and 721.00$ No Fire Commercial (1 Truck) per hour Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by:

Fire / Full Cost: 721.40$
Administration
Resource Fees Charged by: Date: 4/29/2025 Objective: User Fee Water Clean-up – Industrial and 181.00$ No Fire Commercial (1 Haz-Mat) per hour Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by:

Fire / Full Cost: 181.13$
Administration
Reference: CMD 109 9 - 4
Department / Division: Fire / Rental and Resource Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Resource Fees Charged by: Date: 4/29/2025 Objective: User Fee Water Clean-up – Industrial and 265.00$ No Fire Commercial (1 Battalion Chief) per hour Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by:

Fire / Full Cost: 266.00$
Administration
Resource Fees Charged by: Date: 4/29/2025 Objective: User Fee DUI Fire Response 551.00$ No Fire per hour Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Fire / Full Cost: 551.66$
Administration
Reference: CMD 109 9 - 5
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Alternate Materials, Design and Methods 2,050.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost of Construction and Equipment Fire / Prevention User Fee Res. No. 25-9437
Collected by: Prop 26 Exception: 1, 2, 3
Fire / Prevention
Permit Center Full Cost: 2,050.34$
Automatic Fire Extinguishing Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Special Hazard Systems (including Halon, 1,757.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Wet and Dry Chemical Systems, CO2, Collected by:

Foam and Similar Systems). Fire / Prevention Full Cost: 1,757.43$ Automatic Fire Extinguishing Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Hood & Duct per system 1,025.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 1,025.69$
Automatic Fire Sprinkler Systems - New: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
1 - 49 Heads 1,464.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 1,464.53$
Automatic Fire Sprinkler Systems - New: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
50 - 100 Heads 2,343.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 2,343.24$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 6
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Automatic Fire Sprinkler Systems - New: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
101 - 200 Heads 3,807.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 3,807.77$
Automatic Fire Sprinkler Systems - New: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Each additional 100 Heads ( >200 heads) 878.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 878.72$
Automatic Fire Sprinkler Systems - Charged by: Date: 4/29/2025 Objective: Recover Cost Existing Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
1 - 49 Heads, no calculations 1,098.00$ Yes Collected by:

Fire / Prevention Full Cost: 1,098.39$
Automatic Fire Sprinkler Systems - Charged by: Date: 4/29/2025 Objective: Recover Cost Existing Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
50 - 100 Heads, no calculations 1,391.00$ Yes Collected by:

Fire / Prevention Full Cost: 1,391.04$
Automatic Fire Sprinkler Systems - Charged by: Date: 4/29/2025 Objective: Recover Cost Existing Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
1 - 49 Heads, with calculations 1,903.00$ Yes Collected by:

Fire / Prevention Full Cost: 1,903.88$
Reference: CMD 109 9 - 7
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Automatic Fire Sprinkler Systems - Charged by: Date: 4/29/2025 Objective: Recover Cost Existing Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
50-100 Heads, with calculations 2,196.00$ Yes Collected by:

Fire / Prevention Full Cost: 2,196.79$
Automatic Fire Sprinkler Systems - Charged by: Date: 4/29/2025 Objective: Recover Cost Existing Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
101-200 Heads, with calculations 3,514.00$ Yes Collected by:

Fire / Prevention Full Cost: 3,514.86$
Automatic Fire Sprinkler Systems - Charged by: Date: 4/29/2025 Objective: Recover Cost Existing Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Each additional 100 Heads ( >200 heads) 438.00$ Yes Collected by:

Fire / Prevention Full Cost: 439.36$
Building Plans - FIRE 35% of Building Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Department Fee Permit Center User Fee
$1,025 minimum Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Permit Center Full Cost: 1,025.17$
Building Plans - CUPA 35% of Building Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Department Fee Permit Center User Fee
$1,025 minimum Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Permit Center Full Cost: 1,025.17$
Fire / Prevention
Reference: CMD 109 9 - 8
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Building Plans - FIRE - Expedited Yes Charged by: Date: 4/29/2025 Objective: Recover Cost 50% of Build. Permit Fee Permit Center User Fee
Minimum: OT Fire Fee Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by: Full Cost: varies
Permit Center
Building Plans - CUPA - Expedited 50% of Build. Permit Fee Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Minimum: OT Fire Fee Permit Center User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by: Full Cost: varies
Permit Center
Fire / Prevention
Carnival and Fairs $ 1,464.00 Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,464.53$
Closure of an Onsite Hazardous Waste Charged by: Date: 4/29/2025 Objective: Recover Cost Treatment System: Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Conditionally Authorized and 1,171.00$ Yes Collected by:

Conditionally Exempt Fire / Prevention Full Cost: 1,171.62$ Closure of an Onsite Hazardous Waste Charged by: Date: 4/29/2025 Objective: Recover Cost Treatment System: Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Permit by Rule 1,464.00$ Yes Collected by:

Fire / Prevention Full Cost: 1,464.53$
Reference: CMD 109 9 - 9
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Compressed Gas Installation 2,050.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,050.34$
Cooking Oil Storage Tanks 1,464.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,464.53$
Emergency Responder Radio Coverage 5,272.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost System Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 5,272.29$
Emergency Alarm Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
New System - No Gas Detection 2,343.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 2,343.24$
Emergency Alarm Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Modification - No Gas Detection 1,171.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 1,171.62$ Reference: CMD 109 9 - 10 Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Emergency Alarm Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
New System - Including Gas Detection 2,929.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 2,929.05$
Emergency Alarm Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Modification - Including Gas Detection 1,464.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 1,464.53$
Engineering Referrals 1,171.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
(Parcel maps, public roads, EVAE's, Fire User Fee
public fire hydrants) Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 1,171.62$
Environmental Impact Report Initial 2,343.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
Review (includes 6 hours of review) Fire / Prevention User Fee Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,343.24$
Environmental Impact Report - each 292.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
additional hour after initial review Fire / Prevention User Fee Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 292.91$ Reference: CMD 109 9 - 11 Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Exhibit and Trade Shows 1,464.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,464.53$
Fire Alarm Systems (Non-high rise and Charged by: Date: 4/29/2025 Objective: Recover Cost R-2 Occupancies: Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
1 - 20 Devices 1,171.00$ Yes Collected by:

Fire / Prevention Full Cost: 1,171.62$
Fire Alarm Systems (Non-high rise and Charged by: Date: 4/29/2025 Objective: Recover Cost R-2 Occupancies: Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
21 - 40 Devices 1,757.00$ Yes Collected by:

Fire / Prevention Full Cost: 1,757.43$
Fire Alarm Systems (Non-high rise and Charged by: Date: 4/29/2025 Objective: Recover Cost R-2 Occupancies: Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
41 - 100 Devices 2,929.00$ Yes Collected by:

Fire / Prevention Full Cost: 2,929.05$
Fire Alarm Systems (Non-high rise and Charged by: Date: 4/29/2025 Objective: Recover Cost R-2 Occupancies: Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
101 - 200 Devices 3,807.00$ Yes Collected by:

Fire / Prevention Full Cost: 3,807.77$
Reference: CMD 109 9 - 12
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Fire Alarm Systems (Non-high rise and Charged by: Date: 4/29/2025 Objective: Recover Cost R-2 Occupancies: Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Each additional 50 Devices 585.00$ Yes Collected by:
( >200 devices) Fire / Prevention Full Cost: 585.81$
Fire Alarm Systems with pre-wire Charged by: Date: 4/29/2025 Objective: Recover Cost inspection required (high rise and R-2 Fire / Prevention User Fee Occupancies): Res. No. 25-9437
Collected by: Prop 26 Exception: 1, 2, 3
1 - 20 Devices 1,464.00$ Yes Fire / Prevention Full Cost: 1,464.53$
Fire Alarm Systems with pre-wire Charged by: Date: 4/29/2025 Objective: Recover Cost inspection required (high rise and R-2 Fire / Prevention User Fee Occupancies): Res. No. 25-9437
Collected by: Prop 26 Exception: 1, 2, 3
21 - 40 Devices 2,343.00$ Yes Fire / Prevention Full Cost: 2,343.24$
Fire Alarm Systems with pre-wire Charged by: Date: 4/29/2025 Objective: Recover Cost inspection required (high rise and R-2 Fire / Prevention User Fee Occupancies): Res. No. 25-9437
Collected by: Prop 26 Exception: 1, 2, 3
41 - 100 Devices 3,514.00$ Yes Fire / Prevention Full Cost: 3,514.86$
Reference: CMD 109 9 - 13
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Fire Alarm Systems with pre-wire Charged by: Date: 4/29/2025 Objective: Recover Cost inspection required (high rise and R-2 Fire / Prevention User Fee Occupancies): Res. No. 25-9437
Collected by: Prop 26 Exception: 1, 2, 3
101 - 200 Devices 4,393.00$ Yes Fire / Prevention Full Cost: 4,393.58$
Fire Alarm Systems with pre-wire Charged by: Date: 4/29/2025 Objective: Recover Cost inspection required (high rise and R-2 Fire / Prevention User Fee Occupancies): Res. No. 25-9437
Collected by: Prop 26 Exception: 1, 2, 3
Each additional 50 Devices 878.00$ Yes Fire / Prevention ( >200 devices) Full Cost: 878.72$
Fire Pump Installation 3,514.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 3,514.86$
High-Rise Fire Protection Water Storage 1,610.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Tank (1st tank) Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,610.98$
High-Rise Fire Protection Water Storage 585.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
Tank (each additional tank) Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 585.81$
Reference: CMD 109 9 - 14
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Hazardous Materials Closure Plan: Charged by: Date: 4/29/2025 Objective: Recover Cost Modified fee structure Fire / Prevention User Fee
Facility/Site - <=5,000 sq ft 1,464.00$
Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by: Full Cost: 1,464.53$
Facility/Site - 5,001 to 25,000 sq ft 2,343.00$ Yes Fire / Prevention Full Cost: 2,343.24$ Facility/Site - >25,001 sq ft 2,929.00$ Yes Full Cost: 2,929.05$ Backflow Preventer Replacement 1,757.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,757.43$
Hazardous Materials Closure Plan: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Equipment 2,929.00$
Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,929.05$
Hazardous Material Tool / Equipment 2,929.00
$
Yes Charged by: Date: 4/29/2025 Objective: Recover Cost New Installation Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,929.05$
High-Piled Combustible Storage 2,343.00
$
Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,343.24$
Reference: CMD 109 9 - 15
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Knox Box Installation 438.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 439.36$
Liquified Petroleum Gases Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Installation per Tank 1,171.00$
Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,171.62$
Methane Venting and Detection Systems 4,100.00
$
Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 4,100.67$
Open Burnings 878.00
$
Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 878.72$
Ovens Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Industrial Baking and / or Drying per
oven
1,
171.00$
Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,171.62$
Reference: CMD 109 9 - 16
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Community Development Department 2,050.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Referrals Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,050.34$
Public Fireworks Display and Pyrotechnic 2,343.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Special Effects Use Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Secondary Fireworks/Pyro Submittal - 585.00$ Yes Collected by:

No Detailed Plan Review Required Fire / Prevention Full Cost: 2,343.24$ Full Cost: 585.81$
Pyrotechnics Special Effects Proximal 3,514.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost to Audience Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Secondary Pyro Submittal - 878.00$ Yes Collected by:

No Detailed Plan Review Required Fire / Prevention Full Cost: 3,514.86$ Full Cost: 878.72$
Refrigeration System 1,757.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,757.43$
Reference: CMD 109 9 - 17
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Access Control and Traffic Calming 1,171.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Devices, Gates and Barricades across Fire User Fee
fire apparatus access roads Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 1,171.62$
Smoke Control System 5,858.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 5,858.10$
Standpipe Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Wet, Combination and Horizontal 1,464.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 1,464.53$
Storage Tanks - Hazardous Materials: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Underground and Above Ground Tank 2,929.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Installations (1st tank) Collected by:

Fire / Prevention Full Cost: 2,929.05$
Underground and Above Ground Tank 1,171.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
Installations (each additional tank after Fire / Prevention User Fee the 1st) Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,171.62$ Reference: CMD 109 9 - 18 Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Storage Tanks - Hazardous Materials: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Underground and Above Ground Tank 2,636.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Removals (1st tank) Collected by:

Fire / Prevention Full Cost: 2,636.15$
Underground and Above Ground Tank 1,171.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Removals (each additional tank after Fire / Prevention User Fee the 1st) Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,171.62$
Underground and Above Ground Tank 1,464.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
Modifications Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,464.53$
First Tent, Canopy or Air 1,171.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
Supported Structure Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,171.62$
Each Additional Tent, Canopy 438.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
or Air Supported Structure Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 439.36$ Reference: CMD 109 9 - 19 Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Special Event Structure 2,929.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,929.05$
Underground Fire Service Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Fire Sprinkler System (no hydrants) 2,050.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 2,050.34$
Underground Fire Service Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Fire Sprinkler System with hydrants 2,636.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 2,636.15$
Underground Fire Service Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Repairs and Minor Modifications 1,171.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 1,171.62$
Automatic Fire Sprinkler Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Residential 13D - Initial Submittal Plan 1,757.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Review Required Collected by:

Fire / Prevention Full Cost: 1,757.43$ Reference: CMD 109 9 - 20 Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Automatic Fire Sprinkler Systems: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Residential 13D - Secondary Submittal - 878.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 No Detailed Review Required Collected by:

Fire / Prevention Full Cost: 878.72$
Automatic Fire Protection System for 1,610.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Spray Booths Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,611.50$
On-Demand Mobile Fueling Site Permit 2,343.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,343.24$
2-Way Elevator Permit 1,757.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,757.43$
Solar Photovoltaic Power Systems - 2,343.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
COMMERCIAL Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,343.24$ Reference: CMD 109 9 - 21 Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Solar Photovoltaic Power Systems - 439.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost RESIDENTIAL Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 439.88$
Phased Permitting / Occupancy Plan 3,514.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 3,514.86$
Access Controlled Egress 2,050.00$ Yes
Charged by: Date: 4/29/2025 Objective: Recover Cost
Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,050.34$
2,050.00Fire Safety Demolition / Construction
Plan
Ye s Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,050.34$
Reference: CMD 109 9 - 22
$
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Hazardous Materials Tools / Equipment: Charged by: Date: 4/29/2025 Objective: Recover Cost Modified fee structure Fire / Prevention User Fee
Modification / Addition to Existing Tool / 1,757.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Equipment Collected by: Full Cost: 1,757.43$
Modification to Existing Tool - Changing 1,171.00$ Yes Fire / Prevention Full Cost: 1,171.62$ to Haz Mat and Detection - no
construction
Demolition Only 1,171.00$ Yes Full Cost: 1,171.62$ Energy Storage Systems 2,343.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,343.00$
Energy Storage Systems - 585.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost RESIDENTIAL (R3) Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 585.81$
Energy Storage Systems - 1,171.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
Commercial Decommissioning Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,171.62$
Reference: CMD 109 9 - 23
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Plant Extraction Systems 2,343.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 2,343.24$
Plan Revision Fee 585.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire / Prevention User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 585.81$
Resubmittal Fee 1,171.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost This fee was previously Fire / Prevention User Fee combined with the Plan
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Revision Fee; Department is Collected by: now breaking this out
Fire / Prevention Full Cost: 1,171.62$ separately.

Carbon Dioxide Beverage Dispensing 1,464.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost System Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,464.53$
Design Review / Consultation 292.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost per hour Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 292.91$
Reference: CMD 109 9 - 24
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Miscellaneous Inspections or Plan 292.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Reviews, per hour per hour Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 292.91$
Miscellaneous Haz Mat Inspections or Haz 292.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Mat Plan Reviews, or Haz Mat Field per hour Fire User Fee Sampling, per hour Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire / Prevention Full Cost: 292.91$
Overtime Inspection (max 3 hrs) 1,053.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost (max 3 hours) Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,054.46$
Overtime Haz Mat Inspection (max 3 hrs) 1,053.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost (max 3 hours) Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,054.46$
Overtime Plan Review (max 3 hrs) 1,053.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost
(max 3 hours) Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,054.46$
Reference: CMD 109 9 - 25
Department / Division: Fire / Construction Permits / General Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Overtime Haz Mat Plan Review 1,053.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost (max 3 hrs) (max 3 hours) Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,054.46$
Outdoor Assembly Event 1,464.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 1,464.53$
Licensed Care Facility (Pre-Inspection) 585.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost
Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 585.81$
Residential Fire-Building Plan Review - 365.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost (R-3/R-3.1 occupancies only) Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire / Prevention Full Cost: 366.13$
Hourly Rate for Miscellaneous Services
Charged by: Date: 4/29/2025 Objective: Recover Cost
Fire User Fee
Regular Hours 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 per hour Collected by: Full Cost: 292.91$
Overtime 351.00$ Yes Fire / Prevention per hour Full Cost: 351.49$
Reference: CMD 109 9 - 26
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Aerosol Products 379.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 380.78$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Additive Manufacturing 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Amusement Park Buildings 379.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 380.78$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Covered and Open Mall Buildings 1,757.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 1,757.43$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Exhibit and Trade Shows 379.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 380.78$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 27
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Explosives 379.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 380.78$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Cutting and Welding 379.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 380.78$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Cellulose Nitrate Storage 145.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 146.45$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Combustible Dust Producing Operations 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Combustible Fiber Storage 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 292.91$
Reference: CMD 109 9 - 28
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Combustible Storage - Including tires in 219.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 excess of 2,500 cubic feet Annual Collected by:

Finance Full Cost: 219.68$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Dry Cleaning Plants 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Energy Storage Systems 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
High-Piled Combustible Storage 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Hot Work Operations 145.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 146.45$
Reference: CMD 109 9 - 29
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Lithium-Ion and Lithium Metal Battery 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Storage Annual Collected by:

Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Lumber Yard - more than 100,000 board 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 feet Annual Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Magnesium Working - more than 10 lbs. 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 per work day Annual Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Miscellaneous combustible storage 145.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 146.45$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Organic Coatings 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Reference: CMD 109 9 - 30
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Industrial Ovens 145.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 146.45$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Places of Assembly 219.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 219.68$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Places of Assembly (Temporary) 1,757.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Finance Full Cost: 1,757.43$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Compressed Gases 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Pyroxylin Plastics 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
Reference: CMD 109 9 - 31
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Refrigeration Equipment 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Repair Garages 190.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 190.44$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Rooftop Heliports 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Smoke Control and Evacuation Systems 805.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Finance Full Cost: 805.23$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Spraying or Dipping Operations 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Reference: CMD 109 9 - 32
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Tire Rebuilding Plants 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Waste Handling Facilities 659.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 659.30$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Wood Products – Storage in excess of 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 200 cubic feet Annual Collected by:

Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Liquid-or-gas Vehicles or Equipment 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 in Assembly Buildings per hour Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Motor Fuel Dispensing Facilities 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 292.91$
Reference: CMD 109 9 - 33
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Pyrotechnics Special Effects Material 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Storage Annual Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Plant Extraction Systems 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Indoor Growing Operations 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Emergency Responder Radio Coverage 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 System Annual Collected by:

Finance Full Cost: 585.81$
Single Story Building Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
1 to 20,000 square feet 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Reference: CMD 109 9 - 34
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Single Story Building Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
20,001 square feet or greater 658.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 659.04$
Multi-Story Buildings Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
2 or more stories in height and not 878.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 classified as a High Rise (per floor) per floor Collected by:

Finance Full Cost: 878.72$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Operational Permit Reinspection Fee 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 (per hour) Annual Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Energy Storage Systems, Serving Life 145.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Safety Systems Collected by:

Finance Full Cost: 146.45$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Mobile Fueling of Hydrogen-Fueled 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Vehicles Annual Collected by:

Finance Full Cost: 585.81$
Reference: CMD 109 9 - 35
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Hazardous Production Materials Facilities 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Private Fire Hydrants 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Fire Hydrants and Valves 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 292.91$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Temporary Membrane Structures and 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Tents Annual Collected by:

Finance Full Cost: 585.81$
Reference: CMD 109 9 - 36
Department / Division: Fire / Operational Permits Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Lithium Batteries 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
Operational Permit: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Additional Permits 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
Reference: CMD 109 9 - 37
Department / Division: Fire / Operational Permits - Haz Mat Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Flammable and Combustible Liquids 292.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Materials Annual Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 292.91$
Combustible and Flammable Materials - 1,757.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost On Demand Mobile Fueling Annual Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 1,757.43$
Corrosives 379.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Annual Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 380.78$
Cryogenic Fluids 379.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Annual Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 380.78$
Highly Toxic Materials 585.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Annual Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 585.81$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 38
Department / Division: Fire / Operational Permits - Haz Mat Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Liquefied Petroleum Gas 379.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Annual Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 380.78$
Organic Peroxides: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Liquids and Solids - any amount 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Except: Class V Organic Peroxides Finance Full Cost: 439.36$ Organic Materials: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Gases, Liquids and Solids 379.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 380.78$
Pyrophoric Materials: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Gases, Liquids and Solids - any amount 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Toxic Materials: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Gases, Liquids and Solids 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Reference: CMD 109 9 - 39
Department / Division: Fire / Operational Permits - Haz Mat Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Unstable (Reactive) Materials: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Gases, Liquids and Solids 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Water Reactive Materials: Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
Gases, Liquids and Solids 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$
Reference: CMD 109 9 - 40
Department / Division: Fire / State Mandated Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
High Rise (per floor) 1,171.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost per floor Fire User Fee
Annual Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 1,171.62$
R-1/R-2 Occupancies: Charged by: Date: 4/23/2024 Objective: Recover Cost Fire User Fee
Multi-Family, 3 or more residential units 28.00$ Yes Res. No. 24-9316 Prop 26 Exception: 1, 2, 3 per unit Collected by:

Finance Full Cost: 28.98$
High Rise R-1 / R-2 (per floor) 951.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost per floor Fire User Fee
Annual Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 951.94$
Commercial Day Care (E3) Charged by: Date: 4/29/2025 Objective: Recover Cost Adult Day Care (I4) Fire User Fee
7 - 49 persons 292.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 292.91$
Commercial Day Care (E3) Charged by: Date: 4/29/2025 Objective: Recover Cost Adult Day Care (I4) Fire User Fee
50 - 149 persons 438.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 439.36$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 41
Department / Division: Fire / State Mandated Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Commercial Day Care (E3) Charged by: Date: 4/29/2025 Objective: Recover Cost Adult Day Care (I4) Fire User Fee
150 + persons 878.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 878.72$
School Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
1 - 250 Students 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 585.81$
School Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
251 - 500 Students 1,171.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 1,171.62$
School Charged by: Date: 4/29/2025 Objective: Recover Cost Fire User Fee
> 500 Students 2,343.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Annual Collected by:

Finance Full Cost: 2,343.24$
Reference: CMD 109 9 - 42
Department / Division: Fire / State Mandated Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Jails 878.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Annual Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 878.72$
Hospitals 2,929.00$ Yes Charged by: Date: 4/29/2025 Objective: Recover Cost Annual Fire User Fee
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Finance Full Cost: 2,929.05$
Reference: CMD 109 9 - 43
Department / Division: Fire / Penalty Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
False Alarm Responses Charged by: Date: 4/29/2025 Objective: Penalty Fire
After third time in 180 day period 512.00$ No Res. No. 25-9437 Prop 26 Exception: 1, 2 per response Collected by:

Fire Prevention Full Cost: 512.33$
Re-Inspection Fee (Development): Charged by: Date: 4/29/2025 Objective: Penalty Fire
For failure to cancel appointment, work 585.00$ No Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 not ready for inspection or more than two Collected by:
re-inspections Fire Prevention Full Cost: 585.81$
Re-Inspection Fee (CUPA Development): Charged by: Date: 4/29/2025 Objective: Penalty The re-inspection fee is now Fire being broken out by their
For failure to cancel appointment, work 585.00$ No Res. No. 25-9437 Prop 26 Exception: 5 respective programs. not ready for inspection or more than two Collected by: Not a new fee. re-inspections Fire Prevention Full Cost: 585.81$
Re-Inspection Fee (Fire Operational): Charged by: Date: 4/29/2025 Objective: Penalty The re-inspection fee is now Fire being broken out by their
For failure to cancel appointment, work 585.00$ No Res. No. 25-9437 Prop 26 Exception: 5 respective programs. not ready for inspection or more than two Collected by: Not a new fee. re-inspections Fire Prevention Full Cost: 585.81$
Re-Inspection Fee (CUPA Operational): Charged by: Date: 4/29/2025 Objective: Penalty The re-inspection fee is now Fire being broken out by their
For failure to cancel appointment, work 585.00$ No Res. No. 25-9437 Prop 26 Exception: 5 respective programs. not ready for inspection or more than two Collected by: Not a new fee. re-inspections Fire Prevention Full Cost: 585.81$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 44
Department / Division: Fire / Penalty Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Expired Fire Development Construction 1,171.00$ No Charged by: Date: 4/29/2025 Objective: Penalty Permit Reactivation Fee Fire
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire Prevention Full Cost: 1,171.62$
Expired Fire Development Construction 1,171.00$ No Charged by: Date: 4/29/2025 Objective: Penalty Permit Plan Review Reactivation Fee Fire
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3
Collected by:

Fire Prevention Full Cost: 1,171.62$
Expired CUPA Development Construction 1,171.00$ No Charged by: Date: 4/29/2025 Objective: Penalty The expired construction Permit Reactivation Fee Fire permit reactivation fee is now Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 being broken out by their Collected by: respective programs.

Fire Prevention Full Cost: 1,171.62$ Not a new fee.

Expired CUPA Development Construction 1,171.00$ No Charged by: Date: 4/29/2025 Objective: Penalty The expired construction Permit Plan Review Reactivation Fee Fire permit reactivation fee is now Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 being broken out by their Collected by: respective programs.

Fire Prevention Full Cost: 1,171.62$ Not a new fee.

Administrative Citations Penalty as Assessed No Charged by: Date: 4/18/2023 Objective: Penalty per CSC Municipal Code Fire
Res. No. 23-9221 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Reference: CMD 109 9 - 45
Department / Division: Fire / Penalty Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Late filing of documents / reports / 103.00$ No Charged by: Date: 4/29/2025 Objective: Penalty information - per occurrence per occurrence Fire
Res. No. 25-9437 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Late filing of CUPA documents / reports / 517.00$ No Charged by: Date: 4/29/2025 Objective: Penalty information - per occurrence per occurrence Fire
Res. No. 25-9437 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Late Payment of Fire Operational Permit 50% of Assessed Fee No Charged by: Date: 4/18/2023 Objective: Penalty Linked to California Fire Code Fee - >30 days Not to Exceed $500 Fire Section 105.5
Res. No. 23-9221 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Late Payment of CUPA Permit Fee 50% of Assessed Fee No Charged by: Date: 9/19/2023 Objective: Penalty - >30 days Not to Exceed $500 Fire
Res. No. 23-9267 Prop 26 Exception: 5
Collected by:

Fire Prevention Full Cost:

Reference: CMD 109 9 - 46
Department / Division: Fire / Document Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Laserfiche / Microfilm Copies A ctual Cost No Charged by: Date: 4/23/2024 Objective: Recover Cost Records request recover Fire less than full cost
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Fire Full Cost: 73.23$
Photographs Actual Cost No Charged by: Date: 4/23/2024 Objective: Recover Cost Records request recover Fire less than full cost
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Fire Full Cost: 73.23$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 47
Department / Division: Fire / CUPA Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Hazardous Waste Generator Fees: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
Less than 100 Kg per year 512.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 512.58$ FY 25/26: 1/4
Hazardous Waste Generator Fees: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
100 kg to 999 kg 878.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 878.72$ FY 25/26: 1/4
Hazardous Waste Generator Fees: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
1,000 Kg to 4.99 Tons 1,171.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 1,171.62$ FY 25/26: 1/4
Hazardous Waste Generator Fees: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
5 tons to less than 25 tons per year 1,464.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 1,464.53$ FY 25/26: 1/4
Hazardous Waste Generator Fees: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
25 tons and greater 1,757.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 1,757.43$ FY 25/26: 1/4

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 48
Department / Division: Fire / CUPA Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
California Accidental Release Program Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:
(CALARP) Fees: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 FY 23/24: 1/4
CalARP Facility Operating Permit Program 1 2,929.00$ Yes Collected by: Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 Annual Finance FY 25/26: 1/4
Full Cost: 2,929.05$
California Accidental Release Program Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:
(CALARP) Fees: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 FY 23/24: 1/4
CalARP Facility Operating Permit Program 2 3,514.00$ Yes Collected by: Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 Annual Finance FY 25/26: 1/4
Full Cost: 3,514.86$
California Accidental Release Program Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:
(CALARP) Fees: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 FY 23/24: 1/4
CalARP Facility Operating Permit Program 3 3,514.00$ Yes Collected by: Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 Annual Finance FY 25/26: 1/4
Full Cost: 3,514.86$
California Accidental Release Program Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:
(CALARP) Fees: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 FY 23/24: 1/4
RMP Review Fee per hour 292.00$ Yes Collected by: Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 per hour Finance FY 25/26: 1/4
Full Cost: 3,514.86$
Onsite treatment of Hazardous Waste Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Annual Fee - Highest Tier: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 FY 23/24: 1/4
Permit by Rule 2,343.00$ Yes Collected by: Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 Annual Finance FY 25/26: 1/4
Full Cost: 2,343.24$
Reference: CMD 109 9 - 49
Department / Division: Fire / CUPA Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Onsite treatment of Hazardous Waste Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Annual Fee - Highest Tier: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 FY 23/24: 1/4
Conditionally Authorized 1,464.00$ Yes Collected by: Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 Annual Finance FY 25/26: 1/4
Full Cost: 1,464.53$
Onsite treatment of Hazardous Waste Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Annual Fee - Highest Tier: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 FY 23/24: 1/4
Conditionally Exempt 585.00$ Yes Collected by: Prop 26 Exception: 1, 2, 3 FY 24/25: 1/4 Annual Finance FY 25/26: 1/4
Full Cost: 585.81$
State of California Annual Surcharges: Charged by: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.

CUPA Oversight Fee As Determined by No Res. No. 09-7653 Prop 26 Exception: 1, 2, 3 State Regulation Collected by:

Finance Full Cost: N/A
State of California Annual Surcharges: Charged by: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.

Underground Tank Fee As Determined by No Res. No. 09-7653 Prop 26 Exception: 1, 2, 3 State Regulation Collected by:

Finance Full Cost: N/A
State of California Annual Surcharges: Charged by: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.

California Accidental Release Prevention As Determined by No Res. No. 09-7653 Prop 26 Exception: 1, 2, 3 Program State Regulation Collected by:

Finance Full Cost: N/A
Reference: CMD 109 9 - 50
Department / Division: Fire / CUPA Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
State of California Annual Surcharges: Charged by: Date: 4/21/2015 Objective: User Fee Set by State Collected by Fire City and paid to State.

Aboveground Petroleum Storage Act As Determined by No Res. No. 15-8226 Prop 26 Exception: 1, 2, 3 State Regulation Collected by:

Finance Full Cost: N/A
Aboveground Petroleum Storage Tank Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Program: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 < 1,320 gallon capacity 732.00$ Yes Collected by: FY 24/25: 1/4 Annual Finance Full Cost: 732.26$ FY 25/26: 1/4 Aboveground Petroleum Storage Tank Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Program: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 1,320 - 10,000 gallon capacity 1,025.00$ Yes Collected by: FY 24/25: 1/4 Annual Finance Full Cost: 1,025.17$ FY 25/26: 1/4 Aboveground Petroleum Storage Tank Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Program: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 More than 10,000 gallon capacity 2,050.00$ Yes Collected by: FY 24/25: 1/4 Annual Finance Full Cost: 2,050.34$ FY 25/26: 1/4 Aboveground Petroleum Storage Tank Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Program: Fire User Fee FY 22/23: 1/4
Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Tank in Underground Area (TIUGA) 585.00$ Yes Collected by: FY 24/25: 1/4 Annual Finance Full Cost: 585.81$ FY 25/26: 1/4 Reference: CMD 109 9 - 51
Department / Division: Fire / CUPA Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Underground Hazardous Materials Tank: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
First Tank 2,123.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 2,123.56$ FY 25/26: 1/4
Underground Hazardous Materials Tank: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
Each Additional Tank 585.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 585.81$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
1 - 3 Chemicals 878.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 878.72$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
4 - 6 Chemicals 1,171.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 1,171.62$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
7 - 9 Chemicals 1,757.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 1,757.43$ FY 25/26: 1/4
Reference: CMD 109 9 - 52
Department / Division: Fire / CUPA Fees Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Hazardous Materials Business Plan: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
10 - 15 Chemicals 2,343.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 2,343.24$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
16 - 21 Chemicals 2,929.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 2,929.05$ FY 25/26: 1/4
Hazardous Materials Business Plan: Charged by: Date: 4/29/2025 Objective: Recover Cost Phasing in over 4 year period:

Fire User Fee FY 22/23: 1/4
Each additional chemical > 21 73.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 FY 23/24: 1/4 Annual Collected by: FY 24/25: 1/4
Finance Full Cost: 73.23$ FY 25/26: 1/4
Field Sample - Environmental Laboratory Actual Cost No Charged by: Date: 4/23/2024 Objective: Recover Cost Analysis Fire User Fee
Res. No. 24-9316 Prop 26 Exception: 1, 2, 3
Collected by:

Fire Prevention Full Cost:

Miscellaneous CUPA Inspection, CUPA 292.00$ No Charged by: Date: 4/29/2025 Objective: Recover Cost Plan Reviews, CUPA Field Sampling, or per hour Fire User Fee CUPA Investigation, per hour Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Collected by:

Fire Prevention Full Cost: 292.91$
Reference: CMD 109 9 - 53
Department / Division: Fire / Emergency Medical Services Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Ambulance Transport Fees As determined by No Charged by: Date: 4/23/2024 Objective: Recover Cost Ambulance Transport Fees the County of Santa Fire align with the Santa Clara
Clara Res. No. 24-9316 Prop 26 Exception: 2 County EMS Agency Fee Collected by: Schedule
Fire Full Cost: N/A

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 9 - 54

Department / Division: Library Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Replacement for library materials Current costs of item No Charged by: Date: 4/18/2017 Objective: Recover Cost Processing fee incurred to + processing fee Library Prop 26 Exception: 1, 2 recover the cost of Res. No. replacing library materials.

5.00$ Collected by: Full Cost: 5.00$ Library plus materials
Replacement fee for lost or damaged 2.00$ No Charged by: Date: 4/22/2014 Objective: Recover Cost Cost recovery for replacing library card Library a lost or damaged library card;
Res. No. Prop 26 Exception: 1, 2 1st replacement at no charge.

Collected by:

Library Full Cost:

Replacement Fees for Portable No Charged by: Date: 4/23/2024 Objective: Recover Cost Electronic Devices Library
Res. No. 24-9316 Prop 26 Exception: 1, 2
Chromebooks Replacement Fee 265.00$ Collected by:

Library Full Cost: N/A
Mobile Hotspot Replacement 60.00$
Fee
Fee for borrowing materials from other 10.00$ No Charged by: Date: 5/8/2018 Objective: Recover Cost libraries (interlibrary loan) per item Library
Res. No. Prop 26 Exception: 1, 2
Collected by:

Library Full Cost: -$
Replacement fee for lost Link+ materials 115.00$ No Charged by: Date: 6/10/2003 Objective: Recover Cost Replacement fee is collected by borrowed from other libraries Library the library and transferred to Res. No. Prop 26 Exception: 1, 2 the owning library; fee amount Collected by: is determined by Link+
Library Full Cost: -$ consortium.

Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Reference: CMD 109 10 - 1
Department / Division: Library Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept
/ Div
---------------
Collecting Dept
/ Div Comments
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Collection Agency Fee Library Asset 16.00$ No Charged by: Date: 4/19/2022 Objective: Recover Cost Fee is assessed to recover Recovery Library the cost charged by
Res. No. 22-9081 Prop 26 Exception: 1, 2 collection agency to the library Collected by: for resolving delinquent
Library Full Cost: -$ accounts.

Fee for using library meeting room Charged by: Date: 6/21/2022 Objective: User Fee Library
Residents / Non-Profits 20.00$ No Res. No. 22-9112 Prop 26 Exception: 4 per meeting Collected by:

Library Full Cost: N/A
Non-Residents 90.00$ No
per hour
Additional assistance required 30.00$ No per hour
Cleaning Fee (As Required) 50.00$ No Date: 4/29/2025 To be collected from renters when custodial work is
Res. No. 25-9437 required subsequent to the
rental to address spills,
carpet stain removal, etc.

Amount will only be
collected if needed.

Reference: CMD 109 10 - 2

Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
SITE PREPARATION Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Casket Burial, Install Single Burial Vault, 4,084.00$ No Res. No. 25-9437 Prop 26 Exception: N/A Single Depth Grave Collected by:

Cemetery & Full Cost: 4,084.69$
Finance
Casket Burial, Install Single Burial Vault, 4,144.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Double Depth Grave Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 4,144.78$
Finance
Casket Burial, Install Companion Vault, 4,972.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Double Depth Grave Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 4,973.09$
Finance
Casket Burial, Install One Small Burial Vaul 308.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost (infants/babies), Single Depth Grave Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 3,374.72$
Finance

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 1
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Cremation - One cremation burial in a 1,657.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Grave Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 1,657.70$
Finance
Cremation - One Cremation placement in a 1,300.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Niche Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 1,301.48$
Finance
Casket - One casket placement in a Crypt 2,605.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,605.11$
Finance
Disinterment - One Casket from a Grave 4,972.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 4,973.09$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 2
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Disinterment - One Casket from a Crypt 2,366.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,366.91$
Finance
Disinterment of One Cremation from a 1,183.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Grave Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 1,183.46$
Finance
Disinterment of One Cremation from a 649.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Niche Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 650.21$
Finance
Disinter and reinter casket into same grave 5,996.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost to make Grave extra depth (Vault not Cemetery
included) Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,997.75$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 3
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Maintenance Fee 471.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 472.09$
Finance
MARKER INSTALLATION Charged by: Date Objective: Recover Cost Cemetery
Installation of a monobar, emblem, flower Actual Cost No Res. No. Prop 26 Exception: N/A Service performed by outside vase, or ring on a crypt (each) Collected by: agency; charge is market rate Cemetery & Full Cost: Actual Cost
Finance
Installation of a flower vase and ring on a Actual Cost No Charged by: Date Objective: Recover Cost Service performed by outside niche (each) Cemetery agency; charge is market rate
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Inscribe shutters or grave markers Actual Cost No Charged by: Date Objective: Recover Cost Service performed by outside (per letter charge) Cemetery agency; charge is market rate Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 4
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Installation of a niche plaque (each) Actual Cost No Charged by: Date Objective: Recover Cost Service performed by outside Cemetery agency; charge is market rate
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Installation of grave marker in South 317.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Babyland, Babyland, Children's Garden Cemetery
and Oak Grove Infant Res. No. 25-9437 Prop 26 Exception: N/A Collected by:

Cemetery & Full Cost: 697.84$
Finance
Flat marker (10"x18" or 12"x24") set into 243.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost earth Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 243.56$
Finance
Flat marker (20"x28") set into earth 303.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 303.64$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 5
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Flat marker (10"x18" or 12"x24") set into 732.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost concrete frame, with or w/o vase cups Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 732.82$
Finance
Single (34" x 12") or Double (46" x 12") 471.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Upright Monument Foundation Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 472.09$
Finance
Remove and dispose of marker, marker 235.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost frame, plaque, vase and ring upon Cemetery
request Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 236.05$
Finance
PROFESSIONAL SERVICES Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Vault Disposal - Casket 471.00$ No Res. No. 25-9437 Prop 26 Exception: N/A Collected by:

Cemetery & Full Cost: 472.09$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 6
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Vault Disposal - Cremation 77.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 78.33$
Finance
Sanitize Crypt 1,657.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 1,657.70$
Finance
Burial Permit Filing Fee 461.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 462.44$
Finance
Hourly Rate (Personnel) 235.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 236.05$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 7
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Custom Hourly Rate Actual Cost No Charged by: Date Objective: Recover Cost Cemetery
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Saturday Service - Casket (Hourly Rate) Actual Cost No Charged by: Date Objective: Recover Cost Cemetery
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Saturday Service - Cremation Actual Cost No Charged by: Date Objective: Recover Cost (Hourly Rate) Cemetery
Res. No. Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: Actual Cost
Finance
Chapel Rental - Two Hours of Use Charged by: Date 4/29/2025 Objective: Recover Cost Chapel is available Cemetery Monday - Friday
Non-Resident 373.00$ No Res. No. 25-9437 Prop 26 Exception: N/A Collected by:

Resident No Charge No Cemetery & Full Cost: 374.45$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 8
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
PERPETUAL CARE (ENDOWMENT) Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Casket - Two Caskets Below Ground 5,873.00$ No Res. No. 25-9437 Prop 26 Exception: N/A Burial Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Casket - Two Caskets Above Ground 5,873.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Burial Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Casket - One Casket Below Ground 2,934.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,934.49$
Finance
Cremation - Two Cremations Below 5,873.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Ground Burial Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 9
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Cremation - One Cremation Below 2,937.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Ground Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,937.71$
Finance
Cremation - Two Cremations Above 5,873.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Ground Burial Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Casket - One Casket - Babyland, South 369.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Babyland, Children's Garden Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Cremation - Two Cremations Above 5,873.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Ground Bank of Memories Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 10
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Casket - One Casket - Above Ground 5,873.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Indoor Mausoleum Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Cremation - Four Cremations Above 11,749.00$
No Charged by: Date 4/29/2025 Objective: Recover Cost
Ground Indoor Mausoleum Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 11,749.80$
Finance
2,937.00$ No Charged by: Date 4/29/2025 Objective: Recover CostCremation - One Cremation Above Ground Indoor Mausoleum C
emetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 2,937.71$
Finance
Casket - One Casket Above Ground 5,873.00$
No Charged by: Date 4/29/2025 Objective: Recover Cost
Garden Mausoleum Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 11
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Casket - One Casket Above Ground 11,749.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Garden Mausoleum Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 11,749.80$
Finance
Cremation - Two Cremations Above 5,873.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Ground Garden Mausoleum Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
Cremation - Four Cremations Below 11,749.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Ground Oak Grove Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 11,749.80$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 12
Department / Division: Parks & Recreation / Cemetery Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Casket - One Casket - Below Ground 742.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Oak Grove Infant Cemetery
Res. No. 25-9437 Prop 26 Exception: N/A
Collected by:

Cemetery & Full Cost: 5,874.36$
Finance
BURIAL MATERIALS Charged by: Date 4/29/2025 Objective: Recover Cost Cemetery
Burial Materials Processing Fee 152.00$ No Res. No. 25-9437 Prop 26 Exception: N/A All materials are priced at actual cost Collected by:

Cemetery & Full Cost: 152.36$
Finance
* Note: N/A here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.

Reference: CMD 109 11 - 13
FY 2024/25
Resident Rate
FY 2025/26
Resident Rate
Change
%
FY 2024/25
Non-Resident Rate
FY 2025/26
Non-Resident Rate
Change
%
Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier A $28,116 $29,101 3.50% $33,078 $34,236 3.50% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier B or C $30,546 $31,615 3.50% $35,937 $37,195 3.50% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier D $26,067 $26,980 3.50% $30,667 $31,741 3.50% Casket Crypt Right to inter one decedent, Garden Mausoleum, Tier E $23,628 $24,455 3.50% $27,798 $28,771 3.50% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier A $32,332 $33,464 3.50% $38,038 $39,369 3.50% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier B-C $34,831 $36,050 3.50% $40,977 $42,412 3.50% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier D $29,977 $31,026 3.50% $35,266 $36,501 3.50% Casket Crypt Right to inter one decedent, Indoor Mausoleum, Tier E $27,171 $28,122 3.50% $31,966 $33,085 3.50% Casket Crypts Right to inter two decedents, Garden Mausoleum, All tiers $45,366 $46,954 3.50% $53,372 $55,240 3.50% Casket Crypts Right to inter two decedents, Indoor Mausoleum, All tiers $62,078 $64,250 3.50% $73,032 $75,588 3.50% Casket Grave Right to inter one decedent, Oak Grove Infant $664 $687 3.50% $781 $808 3.50% Casket Grave Right to inter one decedent, flat marker section* $4,905 $5,077 3.50% $5,771 $5,973 3.50% Casket Grave Right to inter one decedent, upright monument section** $7,602 $7,868 3.50% $8,943 $9,256 3.50% Casket Grave Right to inter two decedents, flat marker section* $6,889 $7,130 3.50% $8,105 $8,389 3.50% Casket Grave Right to inter two decedents, upright monument section** $10,019 $10,370 3.50% $11,788 $12,200 3.50% Casket/Cremation Grave Right to inter one decedent, Babyland, South Babyland and Children's Garden
$332 $344 3.50% $391 $404 3.50%
Cremation Grave Right to inter four cremations in a grave, upright monument section** $10,574 $10,944 3.50% $12,440 $12,875 3.50% Cremation Grave Right to inter three cremations in a grave, upright monument section** $6,610 $6,842 3.50% $7,777 $8,049 3.50% Cremation Grave Right to inter two cremations in a grave, upright monument section** $5,287 $5,472 3.50% $6,220 $6,438 3.50% Cremation Grave Right to inter one cremation in a grave with a casket $2,202 $2,279 3.50% $2,591 $2,681 3.50% Cremation Grave Right to inter two cremations in a grave, Willow Bend Way and Sunrise Gardens
$4,591 $4,752 3.50% $5,401 $5,590 3.50%
Cremation Niche Right to inter two cremations in Bank of Memories, Tiers M-T $1,207 $1,249 3.50% $1,420 $1,470 3.50% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers I-L $1,450 $1,500 3.50% $1,705 $1,765 3.50% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers E-H $1,700 $1,759 3.50% $2,000 $2,070 3.50% Cremation Niche Right to inter two cremations in Bank of Memories, Tiers A-D $1,450 $1,500 3.50% $1,705 $1,765 3.50% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 1-2 $10,623 $10,994 3.50% $12,497 $12,934 3.50% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 3-5 $10,623 $10,994 3.50% $12,497 $12,934 3.50% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 6-8 $10,623 $10,994 3.50% $12,497 $12,934 3.50% Cremation Niche Right to inter four cremations in Indoor Mausoleum, Tier 9-10 $10,623 $10,994 3.50% $12,497 $12,934 3.50% Cremation Niche Right to inter one cremation in Indoor Community Mausoleum $2,766 $2,863 3.50% $3,254 $3,368 3.50% Cremation Niche Right to inter two cremations in Garden Court or Sunset Garden Niche Bank, Tiers E-F
$4,343 $4,495 3.50% $5,109 $5,288 3.50%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tier D
$3,865 $4,000 3.50% $4,547 $4,706 3.50%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tier C
$3,376 $3,494 3.50% $3,972 $4,111 3.50%
Cremation Niche Right to inter two cremations in Garden Court Niche Bank or Sunset Garden Niche Bank, Tiers A-B
$2,797 $2,895 3.50% $3,291 $3,406 3.50%
Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier A - D $4,169 $4,315 3.50% $4,905 $5,077 3.50% Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier E - H $3,709 $3,839 3.50% $4,364 $4,516 3.50% Cremation Niche Right to inter two cremations in Garden Mausoleum, Tier I - J $3,241 $3,354 3.50% $3,813 $3,946 3.50% Interment Rights
Mission City Memorial Park Interment Rights and Burial Materials Fee Schedule ** Azalea Lawn, Begonia Lawn, Camellia Lawn, Greek Annex, Greek Plot, Oak Grove, Valley Oak, Cypress Lawn, Sections D, E, F, EE, G, H, J, K, P, and T, All corridors and family blocks. * Acacia Lawn, Hillside Lawn, Palm Lawn, Palm Hill, Redwood Grove, Section L, Section S, Serenity Lawn, Willow Bend Way, Evergreen. 11 - 14
Mission City Memorial Park Interment Rights and Burial Materials Fee Schedule Burial Materials FY 2024/25
Resident Rate
FY 2025/26
Resident Rate
Change
%
FY 2024/25
Non-Resident Rate
FY 2025/26
Non-Resident Rate
Change
%
Casket Crypt Casket tray and absorbant pad Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Crypt Monbar/unibar Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Crypt Shutter replacement, crypt Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, companion casket vault (G3086-5) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra long, single casket vault G3690-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra small casket vault, child (V1637-1) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, extra wide, single casket vault (G4490-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, single casket vault (G3086-6) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket Grave Outer Burial Container, small casket vault, infant (U711) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Grave Outer Burial Container, double cremation vault (U711) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Grave Outer Burial Container, single cremation vault Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Bank of Memories (5660 TC and BC) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Bank of Memories (5660 TCB) Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Niche plaque, Garden mausoleum Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Cremation Niche Shutter replacement, niche Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket/Cremation Niche/Crypt Bronze Flower Vase Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Casket/Cremation Niche/Crypt Plastic Flower Vase and Bronze Vase Ring Market Rate + Tax + Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Emblem (custom under 8") Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Emblem (stand alone) Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
Market Rate + Tax +
Shipping & Handling
11 - 15
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
Recreation Center Auditorium / Senior Charged by: Date 4/19/2022 Objective: Recover Cost Center (Senior Center available only for Parks & Rec.

Senior - based programs): Res. No. 22-9081 & Prop 26 Exception: 4 Collected by: 22-9082 Full Cost: Varies
Auditorium w/o Kitchen: Non-Profit Meeting 20.00$ No Parks & Rec. 1% - 20% Cost Recovery Full cost includes kitchen. per meeting Hourly Staff costs may be
charged for bookings, in
Auditorium w/ Kitchen: Non-Profit Event 20.00$ No 1% - 20% Cost Recovery addition to the room rental fee. per hour
Staffing needs determined by
Auditorium w/ Kitchen: Resident Event 207.00$ No Date 4/29/2025 Market Rate Parks & Recreation staff per hour based on hours of use,
Res. No. 25-9437 estimated attendance and
Auditorium w/o Kitchen: 310.00$ No 100% Cost Recovery scope of event.

Commercial / Non-Resident Event per hour
Community Recreation Center: Charged by: Date 4/19/2022 Objective: Recover Cost Hourly Staff costs may be Meeting Rooms Parks & Rec. charged to in addition to the Res. No. 22-9081 & Prop 26 Exception: 4 room(s) fee. Staffing needs Non-Profit Meeting 20.00$ No Collected by: 22-9082 determined by Parks & per meeting Parks & Rec. Full Cost: Varies Recreation staff based on hours of use, estimated
1 % - 20% Cost Recovery attendance and scope of event.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 12 - 1
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Park Building Room Rentals (60 ppl or less) Charged by: Date 4/19/2022 Objective: Recover Cost Lick Mill, Machado, Maywood, Parks & Rec.

Westwood Oaks, Lawrence Station Res. No. 22-9081 & Prop 26 Exception: 4 Community Rooms B,C Collected by: 22-9082 Full Cost: Varies Parks & Rec.

Non-Profit Meeting 20.00$ No 1% - 20% Cost Recovery Hourly Staff costs may be per meeting charged in addition to the
room(s) fee.

Non-Profit Event 20.00$ No 1% - 20% Cost Recovery per hour Staffing needs determined by
Parks & Recreation staff
Resident Event 62.00$ No Date 4/29/2025 Market Rate based on hours of use, per hour estimated attendance and
Res. No. 25-9437 scope of event.

Commercial / Non-Resident Event 93.00$ No Market Rate per hour
Park Building Room Rentals (60 - 120 ppl) Charged by: Date 4/23/2024 Objective: Recover Cost Montague, Lawrence Station Community Parks & Rec.

Room A (Large Room w/ Kitchen, WIFI) Res. No. 24-9316 Prop 26 Exception: 4 Collected by: Full Cost: Varies
Parks & Rec.

Non-Profit Meeting 20.00$ No 1% - 20% Cost Recovery Hourly Staff costs may be per meeting charged in addition to the
room(s) fee.

Non-Profit Event 20.00$ No 1% - 20% Cost Recovery per hour Staffing needs determined by
Parks & Recreation staff
Resident Event 207.00$ No Date 4/29/2025 Market Rate based on hours of use, per hour estimated attendance and
Res. No. 25-9437 scope of event.

Commercial / Non-Resident Event 310.00$ No Market Rate per hour
Reference: CMD 109 12 - 2
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Central Park Picnic Areas Flat rate per section, Charged by: Date 4/29/2025 Objective: Recover Cost Hourly Staff costs may be per day Parks & Rec. Prop 26 Exception: 4 charged to in addition to the Res. No. 25-9437 Full Cost: Varies facility(s) fee. Staffing needs Non-Profit Event 41.00$ No Collected by: 1% - 20% Cost Recovery determined by Parks & per day Parks & Rec. Recreation staff based on
hours of use, estimated
Resident Event 207.00$ No Market Rate attendance and scope of event. per day
Commercial / Non-Resident Event 621.00$ No Market Rate per day
Electricity Activation and Use Fee 20.00$ No (per permit) per permit
City Plaza Park Gazebo Cost per Day Charged by: Date 4/29/2025 Objective: Recover Cost Hourly Staff costs may be Parks & Rec. Prop 26 Exception: 4 charged to in addition to the Non-Profit Event, 41.00$ No Res. No. 25-9437 Full Cost: Varies facility(s) fee. Staffing needs Event open to the public per day Collected by: 1% - 20% Cost Recovery determined by Parks & Parks & Rec. Recreation staff based on
Resident Event 207.00$ No Market Rate hours of use, estimated per day attendance and scope of event.

Commercial / Non-Resident Event 621.00$ No Market Rate per day
Reference: CMD 109 12 - 3
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Hourly Staff (as-needed) Charged by: Date 4/29/2025 Objective: Recover Cost Staffing needs determined by Assigned to facility 38.00$ No Parks & Rec. Parks & Recreation staff based per person, per hour Res. No. 25-9437 Prop 26 Exception: 4 on hours of use, estimated Collected by: attendance and scope of event.

Equipment Rentals (as-needed) Parks & Rec. Full Cost: $ rate x hours Tables (each) 11.00$ No
each
Chairs (each) 2.00$ No
each
EZ-Up Canopy (each) 51.00$ No each
Podium 51.00$ No
each
Portable Sound System 103.00$ No each
Senior Center: Rooms Charged by: Date 4/29/2025 Objective: Recover Cost Hourly Staff costs may be Parks & Rec. Prop 26 Exception: 4 charged in addition to the room Res. No. 25-9437 Full Cost: Varies rental fee. Staffing needs Non-Profit Meeting 20.00$ No Collected by: 1% - 20% Cost Recovery determined by Parks & per meeting Parks & Rec. Recreation staff based on
hours of use, estimated
Non-Profit Event 20.00$ No 1% - 20% Cost Recovery attendance and scope of event. per hour
Resident Event 62.00$ No Market Rate per hour
Commercial / Non-Resident Event 93.00$ No Market Rate per hour
Reference: CMD 109 12 - 4
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Youth Activity Center: Gymnasium Cost per hour Charged by: Date 4/29/2025 Objective: Recover Cost In addition to City Facility rental Parks & Rec. Prop 26 Exception: 4 fees, Santa Clara Unifed Non-Profit Rental / Court 20.00$ No Res. No. 25-9437 Full Cost: Varies School District Use of Facilities Collected by: 1% - 20% Cost Recovery Fees (Custodial Fee) may be Resident Rental / Court 207.00$ No Parks & Rec. Market Rate applicable.

City hourly staff costs may be
Commercial / Non-Resident Rental / Court 310.00$ No Market Rate charged to in addition to the facility fee. Staffing needs
determined by Parks &
Recreation staff based on
hours of use, estimated
attendance and scope of event.

All fees will be collected by City.

Youth Activity Center: Activity Rooms Cost per hour Charged by: Date 4/29/2025 Objective: Recover Cost In addition to City Facility rental Parks & Rec. Prop 26 Exception: 4 fees, Santa Clara Unifed Non-profit meeting 20.00$ No Res. No. 25-9437 Full Cost: Varies School District Use of Facilities per meeting Collected by: 1% - 20% Cost Recovery Fees (Custodial Fee) may be Parks & Rec. applicable.

Non-profit event 20.00$ No 1% - 20% Cost Recovery City hourly staff costs may be per hour charged to in addition to the
facility fee. Staffing needs
Resident event 62.00$ No Market Rate determined by Parks & per hour Recreation staff based on
hours of use, estimated
Commercial / Non-Resident event 93.00$ No Market Rate attendance and scope of event. per hour All fees will be collected by City.

Reference: CMD 109 12 - 5
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Field and Turf Areas Reservations: Cost per hour Charged by: Date 4/29/2025 Objective: Recover Cost Hourly city staff costs may be Practice and Games Parks & Rec. Prop 26 Exception: 4 charged in addition to the field Res. No. 25-9436; Full Cost: Varies rental fee. Staffing needs Resident Youth / Non-Profit 8.00$ No Collected by: 25-9437 1% - 20% Cost Recovery determined by Parks & Resident Adult / Non-Profit 25.00$ Parks & Rec. Recreation staff based on No Market Rate hours of use, estimated
Resident 60.00$
attendance and scope of event.

Commercial / Non-Resident 280.00$ No Market Rate Central Park Tennis Center / Courts Charged by: Date 4/29/2025 Objective: Recover Cost Fees are based on market rate.

Racquet Court Standard Walk-On or Parks & Rec. Detailed in Qtrly Activity Guide Reservation Fee 12.00$ No Res. No. 25-9437 Prop 26 Exception: 4 per hour (resident) Collected by:

Racquet court reservations are by Parks & Rec. Full Cost: Varies agreement with vendor 14.00$ No per hour (non-resident)
Recreation Cancellation Fee Flat Fee Charged by: Date 4/29/2025 Objective: Recover Cost Cancellation must be requested Parks & Rec. 14 days or more in advance.

Rental athletic facility cancellation fee 56.00$ No Res. No. 25-9437 Prop 26 Exception: 4 Applies to athletic facilities.

Collected by:

Parks & Rec. Full Cost: 57.94$
Field Preparation Cost per day Charged by: Date 4/29/2025 Objective: Recover Cost Parks & Rec. Prop 26 Exception: 4
Non-Profit 31.00$ No Res. No. 25-9437 Full Cost: Varies Collected by: 1% - 20% Cost Recovery
Resident 155.00$ No Parks & Rec. Market Rate Commercial / Non-Resident 310.00$ No Market Rate Reference: CMD 109 12 - 6
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Amplified Music Permit 79.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost per event, per day Parks & Rec.

Res. No. 25-9437 Prop 26 Exception: 4
Collected by:

Parks & Rec. Full Cost: 80.47$
Youth & Teen Center: Multi-Purpose Room Charged by: Date 4/29/2025 Objective: Recover Cost Hourly city staff costs may be Parks & Rec. Prop 26 Exception: 4 charged in addition to the room Non-Profit meeting 20.00$ No Res. No. 25-9437 Full Cost: Varies rental fee. Staffing needs per meeting Collected by: 1% - 20% Cost Recovery determined by Parks & Parks & Rec. Recreation staff based on
Non-Profit event 20.00$ No 1% - 20% Cost Recovery hours of use, estimated per hour attendance and scope of event.

Resident event 62.00$ No Market Rate per hour
Commercial / Non-Resident event 93.00$ No Market Rate per hour
Youth & Teen Center: Classrooms Charged by: Date 4/19/2022 Objective: Recover Cost Hourly city staff costs may be Parks & Rec. charged in addition to the room
Non-Profit meeting 20.00$ No Res. No. 22-9081 & Prop 26 Exception: 4 rental fee. Staffing needs per meeting Collected by: 22-9082 determined by Parks & Parks & Rec. Full Cost: Varies Recreation staff based on hours of use, estimated
attendance and scope of event.

Reference: CMD 109 12 - 7
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Special Event Application Fee Charged by: Date 4/29/2025 Objective: Recover Cost One time application processing Parks & Rec. fee per request; non-exclusive
Resident Special Event 357.00$ No Res. No. 25-9437 Prop 26 Exception: 4 use of public property based Collected by: on Department Head approval.

Resident, Non-Profit 28.00$ No Parks & Rec. Full Cost: 558.90$ City Code 9.35060 City Sponsored Event No Fee No
Non-Resident 558.00$ No
Neighborhood Parks Flat rate per table Charged by: Date 4/29/2025 Objective: Recover Cost Hourly city staff costs may be (Homeridge and Lick Mill Parks) per day Parks & Rec. Prop 26 Exception: 4 charged in addition to the room Res. No. 25-9437 Full Cost: Varies rental fee. Staffing needs Non-Profit Event 20.00$ No Collected by: 1% - 20% Cost Recovery determined by Parks & Recreation staff based on
Parks & Rec. hours of use, estimated
Resident Event 62.00$ No Market Rate attendance and scope of event.

Jump House Permit Flat rate per jump house Charged by: Date 4/19/2022 Objective: Recover Cost Hourly city staff costs may be per day Parks & Rec. charged in addition to the room
Res. No. 22-9081 & Prop 26 Exception: 4 rental fee. Staffing needs Resident - Jump House Permit 25.00$ No Collected by: 22-9082 determined by Parks & Parks & Rec. Full Cost: 91.70$ Recreation staff based on hours of use, estimated
attendance and scope of event.

Reference: CMD 109 12 - 8
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Pool Rentals Cost per hour Charged by: Date 4/29/2025 Objective: Recover Cost Hourly city staff costs may be Parks & Rec. charged in addition to the room
Shared Facility 82.00$ No Res. No. 25-9437 Prop 26 Exception: 4 rental fee. Staffing needs Collected by: determined by Parks &
Exclusive Use 289.00$ No Parks & Rec. Full Cost: Varies Recreation staff based on hours of use, estimated
attendance and scope of event.

Tournament Fee Charged by: Date 4/29/2025 Objective: Recover Cost Fee is exclusive of Competitions, Meets, and Tournaments Parks & Rec. Prop 26 Exception: 4 applicable fee charged by that include competitors from other cities. Res. No. 25-9437 Full Cost: Varies vendor, collected by the Collected by: City.

Parks & Rec.

Non-Profit 113.00$ No 40% Cost Recovery Hourly city staff costs may be per day charged in addition to the base
rental rates and field prep fees.

Resident 113.00$ No 40% Cost Recovery Staffing needs determined by per day Parks & Recreation staff based
on hours of use, estimated
Commercial / Non-Resident 289.00$ No 100% Cost Recovery attendance and scope of event. per day
Special Event Parking at Parks and Per Space Charged by: Date 4/29/2025 Objective: Recover Cost Recreation Facilities Parks & Rec.

Res. No. 25-9437 Prop 26 Exception: 4
Youth Soccer Park: 152 spaces Collected by:

Reed & Grant: 202 spaces Parks & Rec. Full Cost: Varies General Parking 10.00$ No
Premium Parking 103.00$ No
Reference: CMD 109 12 - 9
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Special Event Food, Permitted Activity, Per Event No Charged by: Date 4/19/2022 Objective: Recover Cost Event Sponsorship, or Merchandise $ 0 - 50,000 Parks & Rec.

Vendor Res. No. 22-9081 & Prop 26 Exception: 4
Collected by: 22-9082
Parks & Rec. Full Cost: Varies
Recreation Classes Per Activity No Charged by: Date 4/19/2022 Objective: Recover Cost Detailed in Activity Guide $ 0 - 5,000 Parks & Rec.

Res. No. 22-9081 & Prop 26 Exception: 4
Collected by: 22-9082
Parks & Rec. Full Cost: Varies
Community Garden Space Membership Per Year Charged by: Date 4/29/2025 Objective: Recover Cost Not a new fee. Separating from Parks & Rec. Recreation Classes line item
ADA / Senior Bed or Community Facility 56.00$ No Res. No. 25-9437 Prop 26 Exception: 4 above for clarity.

District Collected by:

Shared / Group Bed 181.00$ No Parks & Rec. Full Cost: Varies Individual Bed 82.00$ No
Half Shared / Group Bed 91.00$ No Recreation Course / Class Cancellation Per Transaction Charged by: Date 4/23/2024 Objective: Recover Cost Not a new fee. Adding to fee Withdrawal Administration Fee 15.00$ No Parks & Rec. schedule for clarity. Detailed Res. No. 24-9316 Prop 26 Exception: 4 in Activity Guide.

Collected by:

Parks & Rec. Full Cost: Varies
Reference: CMD 109 12 - 10
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95050
Quimby Act (Single Fam) 57,394.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95050
Quimby Act (Multi Fam) 38,802.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95050
Mitigation Fee Act (Single Fam) 51,392.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95050
Mitigation Fee (Multi Fam) 34,744.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95051
Quimby Act (Single Fam) 58,785.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number &
Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 12 - 11
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number &
Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95051
Quimby Act (Multi Fam) 39,741.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95051
Mitigation Fee (Single Fam) 52,597.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95051
Mitigation Fee (Multi Fam) 35,558.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95054
Quimby Act (Single Fam) 55,830.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95054
Quimby Act (Multi Fam) 37,744.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Reference: CMD 109 12 - 12
Department / Division: Parks & Recreation / Recreation Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number &
Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95054
Mitigation Fee (Single Fam) 50,036.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Residential Development Charged by: Ord. No 1928; Objective: Impact Dev. Per Muni Code 17.35.040 Park Dedication In-Lieu Fees Parks & Rec 1937 Fee (b) & (c) ZIP Code 95054
Mitigation Fee (Multi Fam) 33,827.00$ No Collected by: Ord. Date 6/24/2014 Prop 26 Exception: 6 Engineering 2/24/2015
Full Cost:

Reference: CMD 109 12 - 13

Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
Alarm Permit 37.00$ No Charged by: Date 5/8/2018 Objective: Penalty Regulatory Fee Police Res. No. 1748
Non-Registration 50.00$ No Prop 26 Exception: 3 Collected by: Date 1/14/2020
Annual Renewal 15.00$ No Police Res. No. 2012 Full Cost: 108.16$ Late 25.00$ No
Reinstatement 15.00$ No
Bingo Organization (License Fee) 50.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include DOJ / FBI Police Live Scan fees.

Res. No. 25-9437 Prop 26 Exception: 3 Regulatory Fee
Collected by:

Police Full Cost: 1,478.16$ City Code Section 5.75.180 CAD Report for Legal Purposes 0.20$ No Charged by: Date 6/10/2008 Objective: Recover Cost Per Public Records Act per page per page Police
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 0.21$
CD for Legal Purposes 3.00$ No Charged by: Date 6/10/2008 Objective: Recover Cost per CD Police
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 3.11$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 13 - 1
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Citation Sign-Off 35.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Non-Santa Clara Citations Only Police
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 36.05$
Clearance Letter 50.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Police
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 50.97$
Closing Out Sale 237.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Regulatory Fee Police
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 237.02$
Color Photographs Per copy Charged by: Date 6/10/2008 Objective: Recover Cost Actual cost of duplication.

Police
4" x 6" Actual Cost No Res. No. 08-7525 Prop 26 Exception: 1, 2 Collected by:
5" x 7" Actual Cost Police Full Cost: Actual Cost
8" x 10" Actual Cost
11" x 14" Actual Cost
16" x 20" Actual Cost
20" x 30" Actual Cost
Reference: CMD 109 13 - 2
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Crime Analysis Reports 0.20$ No Charged by: Date 6/10/2008 Objective: Recover Cost Per Public Records Act per page Police User Fee
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 0.21$
Dispatch Service Required for 256.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Special Events per hour Police
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 256.68$
Driving Under the Influence Per current salary No Charged by: Date 6/15/1999 Objective: Recover Cost Emergency Response schedule plus Police
benefits and current Government Code Prop 26 Exception: 1, 2 citywide overhead Collected by: Sections 53150
Finance 53154 Full Cost: As calculated
False Alarm Calls Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee Police Penalty
Second False Alarm 50.00$ No Res. No. 24-9316 Collected by: Prop 26 Exception: 1, 2, 5
Third False Alarm 115.00$ No Finance Full Cost: 199.58$
Fourth False Alarm ($25 Penalty) 140.00$ No Fifth & Subsequent False Alarm 165.00$ No ($50 Penalty)
Reference: CMD 109 13 - 3
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
False Alarm Calls Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee Police Penalty
Hold-Up Alarm 125.00$ No Res. No. 24-9316 Prop 26 Exception: 1, 2, 5 in addition to alarm fees Collected by:

Finance Full Cost: 156.80$
Fingerprinting Services 71.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Does not include mandated FBI / DOJ Police FBI / DOJ Live Scan Fees.

Fees Res. No. 25-9437 Prop 26 Exception: 1, 2 Regulatory Fee Collected by:

Police Full Cost: 72.11$ Consolidating fingerprint services fees into one
ID Card Renewal 107.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost (for multiple applicants) Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 108.16$
Massage Establishment Application 863.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Police DOJ / FBI Live Scan Fees.

Res. No. 25-9437 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 1,557.42$
Massage Establishment Application - 174.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Sole Proprietor Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 1,130.22$
Reference: CMD 109 13 - 4
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Massage Establishment Renewal 692.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Regulatory Fee Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 1,341.10$
Massage Establishment Renewal - 121.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Sole Proprietor Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 967.98$
Massage Establishment Permit 54.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Amendments Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 108.16$
Motor Funeral Escort Company Initial 377.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Police DOJ / FBI Live Scan Fees.

Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 378.55$
Motor Funeral Escort Company Renewal 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Reference: CMD 109 13 - 5
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Motor Funeral Escort Driver Initial 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Motor Funeral Escort Driver Renewal 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Off-Duty Employment Per current salary No Charged by: Date 6/6/2006 Objective: Recover Cost schedule plus Police
benefits and current Res. No. Prop 26 Exception: N/A
citywide overhead Collected by:

Finance Full Cost: As calculated
Pawn / Secondhand Dealer - Registration 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Police DOJ / FBI Live Scan Fees.

Res. No. 25-9437 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 162.24$
Pawn / Secondhand Dealer - Renewal 107.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Regulatory Fee Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 108.16$
Reference: CMD 109 13 - 6
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Photo CD's 3.00$ No Charged by: Date 6/10/2008 Objective: Recover Cost PRA - no labor fee per CD Police
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 3.11$
Police Reports (per page) 0.20$ No Charged by: Date 6/10/2008 Objective: Recover Cost Per Public Records Act per page Police
Res. No. 08-7525 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 0.21$
Private Security - Registration 216.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 216.32$
Private Security - Renewal 107.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 108.16$
Public Entertainment Application 250.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Police DOJ / FBI Live Scan Fees.

Res. No. 25-9437 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 250.47$
Reference: CMD 109 13 - 7
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Public Entertainment Application - 195.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Renewal Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 196.39$
Public Entertainment General Charged by: Date 2/15/2000 Objective: Penalty Police
Fines for Violation (Infraction): 150.00$ No Ord. No. 1748 Prop 26 Exception: 5 1st Offense Collected by:

Police Full Cost:

Public Entertainment General Charged by: Date 4/19/2022 Objective: Penalty Police
Fines for Violation (Infraction): 300.00$ No Res. No. 22-9081 Prop 26 Exception: 5 2nd Offense Collected by:

Police Full Cost:

Public Entertainment General Charged by: Date 4/19/2022 Objective: Penalty Police
Fines for Violation (Infraction): 750.00$ No Ord. No. 22-9081 Prop 26 Exception: 5 Subsequent Offenses Collected by:

Police Full Cost:

Release of Stored Vehicles 103.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Regulatory Fee Police
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Police Full Cost: 104.02$
Reference: CMD 109 13 - 8
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Repo Fee (repossessed vehicles) 15.00$ No Charged by: Date 4/28/2020 Objective: Recover Cost Mandated by State Law Police
Government Code Prop 26 Exception: 1, 2
Collected by: Section: 41612
Police Full Cost: 53.04$
Residential Parking Permit / Guest 34.00$ No Charged by: Date 4/23/2024 Objective: Recover Cost Regulatory Fee Parking Permit (each) Police
Res. No. 24-9316 Prop 26 Exception: 3
Collected by:

Police Full Cost: 36.05$
Second Response Ordinance Per current salary No Charged by: Date 8/22/1990 Objective: Recover Cost Regulatory Fee schedule plus Police
benefits and current Ord. No. 1849 Prop 26 Exception: 3 citywide overhead Collected by: Code Section:

Finance 9.05.020 Full Cost: As calculated
Solicitor / Peddler Application 377.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Background Investigation Police DOJ / FBI Live Scan Fees.

Res. No. 25-9437 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 378.55$
Solicitor / Peddler Renewal 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Reference: CMD 109 13 - 9
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Solicitor / Peddler Application 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Employee Only Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Taxicab / Pedicab Company 7,678.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Application Police DOJ / FBI Live Scan Fees.

Res. No. 25-9437 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 7,679.18$
Taxicab / Pedicab Company 810.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Renewal per year Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 811.18$
Taxicab / Pedicab Driver 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Application Police DOJ / FBI Live Scan Fees.

Res. No. 25-9437 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 162.24$
Taxicab / Pedicab Driver 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Regulatory Fee Renewal, Retest or Reinspection Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 162.24$
Reference: CMD 109 13 - 10
Department / Division: Police Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Taxicab / Pedicab 216.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Regulatory Fee Annual Safety Inspection Fee Police
Res. No. 25-9437 Prop 26 Exception: 3
Collected by:

Police Full Cost: 216.32$
Tow Drivers - Application 161.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Does not include mandated Police DOJ / FBI Live Scan Fees.

Res. No. 25-9437 Prop 26 Exception: 3
Collected by: Regulatory Fee
Police Full Cost: 162.24$
Tow Drivers - Permit Renewal 47.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Adding to fee schedule.

Police Included in Tow Operator
Res. No. 25-9437 Prop 26 Exception: 3 Agreement - Regulatory Fee Collected by:

Police Full Cost: 47.00$
USB Drive for Police Reports 8.00$ No Charged by: Date 7/16/2019 Objective: Recover Cost Police
Res. No. Prop 26 Exception: 2
Collected by:

Police Full Cost: 8.28$
Reference: CMD 109 13 - 11

Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
Parcel Map and Record of Survey 8,653.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Checking Fee (includes 3 reviews) per map Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 25-9437 Full Cost: 8,653.64$
Parcel Map and Record of Survey 1,521.00$ Yes Checking Fee (Each subsequent Collected by: Full Cost: 1,521.45$ review) Finance
Final Map Checking Fee - First 5 Lots 11,012.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost (includes 3 reviews) Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 25-9437 Full Cost: 11,012.40$
Final Map Checking Fee - First 5 Lots 1,521.00$ Yes (Each subsequent review) Collected by: Full Cost: 1,521.45$ Finance
Final Map Checking Fee per lot beyond 500.00$ Yes Full Cost: 500.94$ 5 lots (includes 3 reviews)
Final Map Checking Fee per lot beyond 500.00$ Yes Full Cost: 500.94$ 5 lots (Each subsequent review)
Amended Parcel Map and Record of 3,613.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Survey Checking Fee per map Engineering / Prop 26 Exception: 1, 2, 3, 6 (includes 2 reviews) LPD Res. No. 25-9437 Full Cost: 3,613.19$ Amended Parcel Map and Record of 1,118.00$ Yes Survey Checking Fee Collected by: Full Cost: 1,118.84$
(Each subsequent review) Finance
Amended Final Map Checking Fee 3,613.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost (includes 2 reviews) per map Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 25-9437 Full Cost: 3,613.19$
Amended Final Map Checking Fee 1,118.00$ Yes (Each subsequent reviews) Collected by: Full Cost: 1,118.84$ Finance

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 14 - 1
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Processing Certificate of Correction 4,043.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost (includes 2 reviews) per map Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 25-9437 Full Cost: 4,043.75$
Processing Certificate of Correction 1,315.00$ Yes (Each subsequent review) Collected by: Full Cost: 1,315.49$ (for Final / Parcel Maps) Finance
Assessment District Reappointment Fee - Charged by: Date 4/29/2025 Objective: Recover Cost Assemblage / Parcel Split Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 25-9437 Full Cost: 9,828.36$
First Two Parcels 9,828.00$ No
Collected by: Full Cost: 2,511.95$
Each Subsequent Parcel 2,511.00$ No Finance Processing Certificate of Compliance 1,835.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost (includes 2 reviews) per certificate Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 25-9437 Full Cost: 1,835.06$
Processing Certificate of Correction 1,040.00$ No (Each subsequent review) Collected by: Full Cost: 1,040.18$ Finance
Lot Line Adjustment Processing 7,876.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost (includes 3 reviews) per certificate Engineering / Prop 26 Exception: 1, 2, 3, 6 LPD Res. No. 25-9437 Full Cost: 7,876.35$
Lot Line Adjustment Processing 1,315.00$ Yes (Each subsequent reviews) Collected by: Full Cost: 1,315.49$ Finance
Security Deposit for Survey Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / Prop 26 Exception: 1, 2, 3, 6 in CCI
Property Monument 1,915.24$ No LPD Res. No. 25-9437 Full Cost: 1,988.50$ per monument See note 1
Minimum Security Deposit 3,831.47$ No Collected by: Full Cost: 3,978.04$ minimum per map Finance
Reference: CMD 109 14 - 2
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Security Deposit for Survey City Standard Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Street Engineering / Prop 26 Exception: 1, 2 in CCI
Monuments 2,554.31$ No LPD Res. No. 25-9437 Full Cost: 2,652.03$ per monument See note 1
Minimum Security Deposit 3,831.47$ No Collected by: Full Cost: 3,978.04$ minimum per map Finance
Encroachment Permit Charged by: Date 4/29/2025 Objective: Recover Cost Engineering /
Processing Fee LPD Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 for Project up to $25K 435.00$ Yes Collected by: Full Cost: 436.25$ per permit Finance
for Project over $25K 872.00$ Yes Full Cost: 872.51$ per permit
Permit Extension for all Projects 482.00$ Yes Full Cost: 482.57$ only applies to extensions for per permit all projects
Reference: CMD 109 14 - 3
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Encroachment Permit Charged by: Date 4/29/2025 Objective: Recover Cost Engineering / Prop 26 Exception: 1, 2, 3
Engineering Plan Check for Projects up 803.00$ Yes LPD Res. No. 25-9437 Full Cost: 803.94$ to $25K (per plan set) - includes 3 reviews
Collected by:

Engineering Plan Check for Projects 1,607.00$ Yes Finance Full Cost: 1,607.87$ between $25K and $35K (per plan set) -
includes 3 reviews
Engineering Plan Check for Projects over 1,918.00$ Yes Full Cost: 1,919.15$ $35K (per plan sheet) - includes 3 reviews
Engineering Plan Check (per plan set) for 172.00$ Yes Full Cost: 173.80$ Projects up to $25K - Each subsequent
review
Engineering Plan Check (per plan set) for 172.00$ Yes Full Cost: 173.80$ Projects between $25K and $35K -
Each subsequent review
Engineering Plan check (per plan sheet) 319.00$ Yes Full Cost: 319.82$ for Projects over $35K - Each
subsequent review
Engineering Plan Check (per plan sheet) 525.00$ Yes Full Cost: 526.21$ for Projects over $35K for revisions
after EP issuance
Reference: CMD 109 14 - 4
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Encroachment Permit Charged by: Date 4/29/2025 Objective: Recover Cost Engineering /
Engineering Inspection LPD Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 $0-$15K 511.00$ Yes Collected by: Full Cost: 511.29$ Finance
$15,001-$25K-base + 4.04% of cost 639.00$ Yes Full Cost: 639.11$ above $15K
$25,001-$35K-base + 5.27% of cost 1,056.00$ Yes Full Cost: 1,056.74$ above $25K
$35,001-$50K-base + 23.49% of cost 1,602.00$ Yes Full Cost: 1,602.18$ above $35K
$50,001-$100K-base + 4.06% of cost 5,249.00$ Yes Full Cost: 5,249.52$ above $50K
$101K-$200K-base + 6.09% of cost 7,349.00$ Yes Full Cost: 7,349.33$ above $100K
$201K-$500K-base + 5.58% of cost 13,648.00$ Yes Full Cost: 13,648.75$ above $200K
$501K-$1M-base + 5.27% of cost above 30,972.00$ Yes Full Cost: 30,972.17$ $500K
>$1M; base 58,269.00$ Yes Full Cost: 58,269.67$ >$1M for each additional $500K or 14,698.00$ Yes Full Cost: 14,698.66$ fraction thereof
Encroachment Permit Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
Slurry Seal Fee 2.50$ Yes LPD Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 per square ft, or See note 1
Collected by: Full Cost: 119.23$
114.66$ Yes Finance
minimum
Reference: CMD 109 14 - 5
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Encroachment Permit Charged by: Date 4/29/2025 Objective: Recover Cost See Article 2 of Chapter 3.1 Field Marking - Storm Drain Engineering / of Div. 5 of Title 1 of the LPD Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Government Code.

Up to 50 ft of excavation 191.00$ Yes Full Cost: 191.73$ Collected by:

Over 50 ft of excavation 191.00$ Yes Finance Full Cost: 191.73$ plus
127.00$ Yes Full Cost: 127.82$ each additional 50 ft or
fraction thereof
Encroachment Permit Charged by: Date 4/29/2025 Objective: Recover Cost See Note 2 Field Marking - Traffic Signal Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 2
Up to 50 ft of excavation 155.00$ Yes Full Cost: 155.25$ Collected by:

Over 50 ft of excavation 155.00$ Yes Finance Full Cost: 155.25$ plus
103.00$ Yes Full Cost: 103.50$ each additional 50 ft or
fraction thereof
Copy of Charged by: Date 6/9/2009 Objective: Recover Cost Citywide rate for copying Engineering / plus sales tax.

Design Criteria 0.20$ No LPD Res. No. 09-7631 Prop 26 Exception: 1, 2 per page for public
Standard Details Collected by: Full Cost: Cost

0.05$ No Finance
Standard Specifications per page for employees
Subdivision Code
Property Development Ordinance
Reference: CMD 109 14 - 6
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Black Line Print of Plan on File Actual Cost No Charged by: Date 6/9/2009 Objective: Recover Cost Actual cost of duplication Engineering
Res. No. 09-7631 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: Cost
Record Drawings Archiving Fee 91.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost per sheet Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 91.08$
Finance
Watershed Map Actual Cost No Charged by: Date 6/9/2009 Objective: Recover Cost Actual cost of duplication Engineering /
LPD Res. No. 09-7631 Prop 26 Exception: 1, 2
Collected by: Full Cost: Cost
Finance
Encroachment Agreement Application Charged by: Date 4/29/2025 Objective: Recover Cost Engineering /
Into Easements 5,718.00$ Yes LPD Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 per application
Collected by: Full Cost: 5,718.89$
Finance
Encroachment Agreement Application Charged by: Date 4/29/2025 Objective: Recover Cost Engineering /
Into Rights-of-Way 6,237.00$ Yes LPD Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 per application
Collected by: Full Cost: 6,238.46$
Finance
Reference: CMD 109 14 - 7
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Preparation of Agreement / Easement / 5,864.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Grant Deed (includes 2 reviews) per document Engineering / Prop 26 Exception: 1, 2 LPD Res. No. 25-9437 Full Cost: 5,864.31$
Preparation of Agreement / Easement / 1,315.00$ Yes Grant Deed (Each subsequent review) Each subsequent Collected by: Full Cost: 1,315.49$ review Finance
Preparation of Minor Agreement / 4,607.00$ Yes Full Cost: 4,607.82$ Easement / Grant Deed per document
(includes 2 reviews)
Preparation of Minor Agreement / 1,315.00$ Yes Full Cost: 1,315.49$ Easement / Grant Deed (Each subsequent Each subsequent
review) review
Combination Agreement / Grant Deed for 7,742.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost for the same lot (2 reviews) both documents Engineering / Prop 26 Exception: 1, 2 LPD Res. No. 25-9437 Full Cost: 7,742.84$
Combination Agreement / Grant Deed for 1,315.00$ Yes the same lot (Each subsequent review) Collected by: Full Cost: 1,315.49$ Finance
Document Recordation Fee Actual Cost No Charged by: Date 6/10/2008 Objective: Recover Cost Fee to recover direct costs for Engineering / recording documents at the
LPD Res. No. 08-7527 Prop 26 Exception: 1, 2 County Recorder.

Collected by: Full Cost: Cost
Finance
Review of Agreements & Easements 5,138.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost per document Engineering / Prop 26 Exception: 1, 2
LPD Res. No. 25-9437 Full Cost: 5,138.78$
Review of Minor Agreements & 3,143.00$ Yes Easements per document Collected by: Full Cost: 3,143.30$ Finance
Reference: CMD 109 14 - 8
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Review of Right of Entry Agreement onto 6,018.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost City Property per agreement Engineering / Prop 26 Exception: 1, 2 LPD Res. No. 25-9437 Full Cost: 6,018.53$
Review of Permit to Enter Agreements 6,018.00$ Yes onto City Property per agreement Collected by: Full Cost: 6,018.53$ Finance
Outside 3rd Party Review or Inspection Actual Cost with initial No Charged by: Date Objective: Recover Cost of Items within public ROW or City deposit Engineering / Easements LPD Res. No. Prop 26 Exception: 1, 2
Collected by: Full Cost: Cost
Finance
Overtime Plan Check, Mapping Review, Actual Cost with initial No Charged by: Date Objective: Recover Cost etc. deposit Engineering /
LPD Res. No. Prop 26 Exception: 1, 2
Collected by: Full Cost: Cost
Finance
Outside 3rd Party Review for Survey Actual Cost with initial No Charged by: Date Objective: Recover Cost or Mapping deposit Engineering /
LPD Res. No. Prop 26 Exception: 1, 2
Collected by: Full Cost: Cost
Finance
Storm Drain Outlet Charge 8,875.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change per acre Engineering / in CCI
LPD Res. No. 25-9437 Prop 26 Exception: 6
See note 1
Collected by: Full Cost: 9,213.27$
Finance
Reference: CMD 109 14 - 9
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Storm Drain Outlet Charge Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
Institutional 8,875.00$ Yes LPD Res. No. 25-9437 Prop 26 Exception: 6 per acre See note 1
Allowed under certain conditions 2,940.87$ Yes Collected by: Full Cost: varies per acre Finance
Sanitary Sewer Outlet Charge 521.22$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change per unit Engineering / in CCI
Residential - Single Family LPD Res. No. 25-9437 Prop 26 Exception: 6 (choose the greatest and add 1,959.73$ Yes See note 1 Conveyance Fee) per lot Collected by: Full Cost: varies Finance
8,875.00$ Yes
per acre
Sanitary Sewer Outlet Charge 732.67$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change per lot Engineering / in CCI
Trailers & Mobile Homes LPD Res. No. 25-9437 Prop 26 Exception: 6 (choose the greatest and add 8,875.00$ Yes See note 1 Conveyance Fee) per acre Collected by: Full Cost: varies Finance
Sanitary Sewer Outlet Charge 521.22$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change per unit Engineering / in CCI
Condo & Planned Unit Development LPD Res. No. 25-9437 Prop 26 Exception: 6 (choose the greatest and add 8,875.00$ Yes See note 1 Conveyance Fee) per acre Collected by: Full Cost: varies Finance
Reference: CMD 109 14 - 10
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Sanitary Sewer Outlet Charge 1,959.73$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change per lot Engineering / in CCI
Commercial & Industrial LPD Res. No. 25-9437 Prop 26 Exception: 6 (choose the greatest and add 8,875.00$ Yes See note 1 Conveyance Fee) per acre Collected by: Full Cost: varies Finance
Sanitary Sewer Outlet Charge - 4,218.00$ No Charged by: Date 6/15/2010 Objective: Recover Cost Conveyance Fee per dwelling unit Engineering /
LPD Res. No. 10-7741 Prop 26 Exception: 6
Accessory Dwelling Unit * 2,653.00$ No * See note 3 for accessory Collected by: Full Cost: 5,019.75$ dwelling unit rate justification Finance
Full Cost: 3,157.42$
Sanitary Sewer Outlet Charge - Charged by: Date 6/15/2010 Objective: Recover Cost Conveyance Fee Engineering /
LPD Res. No. 10-7741 Prop 26 Exception: 6
Non-Residential 8.60$ No
per gallon, per day Collected by: Full Cost: 8.95$
Finance
Sanitary Sewer Capacity Model Run Fee 9,862.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost for initial run Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 6
time & material for
subsequent model run Collected by: Full Cost: 9,862.78$ Finance
Reference: CMD 109 14 - 11
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Existing Improvements Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
A. Street Improvements LPD Res. No. 25-9437 Prop 26 Exception: 6 See note 1
Residential 124.68$ No Collected by: Full Cost: varies Finance
Commercial 264.45$ No
Industrial 190.35$ No
per front foot
Existing Improvements Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
B. Street Curbing 45.48$ No LPD Res. No. 25-9437 Prop 26 Exception: 6 per front foot See note 1
Collected by: Full Cost: varies
Finance
Existing Improvements Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
C. Sidewalk Improvements 18.15$ No LPD Res. No. 25-9437 Prop 26 Exception: 6 per front foot See note 1
Collected by: Full Cost: varies
Finance
Existing Improvements (Cont'd.) Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
D. Street Name Signs 0.32$ No LPD Res. No. 25-9437 Prop 26 Exception: 6 per front foot See note 1
Collected by: Full Cost: varies
Finance
Reference: CMD 109 14 - 12
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Existing Improvements (Cont'd.) Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
E. Sanitary Sewers 45.34$ No LPD Res. No. 25-9437 Prop 26 Exception: 6 per front foot See note 1
Collected by: Full Cost: varies
Finance
Existing Improvements (Cont'd.) Charged by: Date 4/29/2025 Objective: Recover Cost Adjust by Jan - Jan change Engineering / in CCI
F. Storm Drains 45.34$ No LPD Res. No. 25-9437 Prop 26 Exception: 6 per front foot See note 1
Collected by: Full Cost: varies
Finance
Existing Improvements (Cont'd.) Charged by: Date 4/23/2024 Objective: Recover Cost Original cost paid by the City Engineering / will be charged.

G. Right-of-Way and / or Easements Use original cost per No LPD Res. No. 24-9316 Prop 26 Exception: 6 square foot Each case is unique and will
Collected by: Full Cost: varies require research for its original Finance cost.

Recreation Tax (Bedroom) Charged by: Date 8/5/1969 Objective: User Fee See SCCC 3.15.020 New Construction Permit Engineering /
LPD Ord. No. 1216 Prop 26 Exception: 6
First Bedroom 15.00$ No
Collected by: Full Cost:

Each Additional 5.00$ No Finance per bedroom
Reference: CMD 109 14 - 13
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Recreation Tax (Bedroom) Charged by: Date 8/5/1969 Objective: User Fee See SCCC 3.15.020 Additions Engineering /
LPD Ord. No. 1216 Prop 26 Exception: 6
Each Additional 5.00$ No
per bedroom Collected by: Full Cost:

Finance
Traffic Impact Fee pre 10/22/18 Per Square Foot Charged by: Date 4/29/2025 Objective: Impact Dev. Fee Applicable to areas within the Engineering / Traffic Impact Fee Area Map.

Office / R & D 1.27$ No LPD Res. No. 25-9437 Prop 26 Exception: 6 Projects entitled before October 22, 2018 will pay this
Industrial 0.86$ No Collected by: Full Cost: varies Traffic Impact Fee.

Finance
Warehousing, utilities, communications 0.25$ No See Note 1 Hotel - Motel 514.84$ No See SCMC 17.15.330 per room
Reference: CMD 109 14 - 14
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Traffic Impact Fee Per Square Foot Charged by: Date 4/29/2025 Objective: Impact Dev. Fee Applicable citywide.

Engineering / Projects entitled on or after
Office / R & D 1.74$ No LPD Res. No. 25-9437 Prop 26 Exception: 6 October 22, 2018 will pay this Traffic Impact Fee.

Industrial 0.96$ No Collected by: Full Cost: varies Finance Retail elements with total
Warehousing, utilities, communications 0.28$ No sq. ft. < 50,000 sf and any affordable housing units are
Retail 5.79$ No exempt from paying this fee.

Hotel - Motel 912.53$ No See Note 1 per room
See SCMC 17.15.330
Multi-Family Residential 669.18$ No per dwelling unit
Single-Family Residential 1,505.64$ No per dwelling unit
Tasman East Specific Plan Area Impact Charged by: Date 4/29/2025 Objective: Impact Dev. Fee See Note 1 Fee Engineering /
LPD Ord. No. 25-9437 Prop 26 Exception: 6
Multi-Family Residential 8,135.35$ No per dwelling unit Collected by: Full Cost: varies
Finance
Patrick Henry Drive Specific Plan Charged by: Date 4/29/2025 Objective: Impact Dev. Fee Infrastructure Impact Fee Engineering /
LPD Ord. No. 25-9437 Prop 26 Exception: 6
Multi-Family Residential 10,418.08$ No Full Cost: 10,815.16$ per dwelling unit Collected by: per dwelling unit See Note 1 Finance
Office 22.73$ No Full Cost: 23.60$ per square foot per square foot
Reference: CMD 109 14 - 15
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Oversize, Overweight Vehicles Fee per vehicle Charged by: Date 6/7/2005 Objective: User Fee Statewide Rate Engineering /
Single 16.00$ No Traffic Ord. No. Prop 26 Exception: 3 Annual 90.00$ No Collected by: Full Cost: 145.42$ Finance
Traffic Flow Map - mailed 47.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost each Engineering / Prop 26 Exception: 1, 2
Traffic Res. No. 25-9437 Full Cost: 48.47$
Traffic Flow Map - not mailed 23.00$ No each Collected by: Full Cost: 24.24$
Finance
Storage or Refuse Bins on City Street 167.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Engineering /
Traffic Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 290.84$
Finance
Temporary Sanitary Sewer Discharge 1,520.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Engineering /
Traffic Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 1,520.42$
Finance
Reference: CMD 109 14 - 16
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Building Permit Site Clearance Fee Charged by: Date 4/29/2025 Objective: Recover Cost Engineering / Prop 26 Exception: 1, 2
A) Minor 144.00$ Yes LPD Res. No. 25-9437 Full Cost: 145.42$ B) Major 289.00$ Yes Collected by: Full Cost: 290.84$ Finance
Subdivision Committee Review: 1,736.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Tentative Map (4 or fewer lots) Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 1,737.25$
Finance
Subdivision Committee Review: 2,723.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Tentative Map (5 or more lots) Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 2,723.09$
Finance
Subdivision Committee Review: 787.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Lot Line Adjustment Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 787.64$
Finance
Reference: CMD 109 14 - 17
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Project Clearance Committee Review: 977.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Preliminary application / Re-Zoning / Engineering /
Architect Review LPD Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by: Full Cost: 977.04$
Finance
Project Clearance Committee Review: 476.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Use Permit / Variance Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 476.62$
Finance
Project Clearance Committee Review: 2,985.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost CEQA - Initial Study Review Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 2,985.98$
Finance
Project Clearance Committee Review: 4,950.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost CEQA - EIR Review Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 4,950.41$
Finance
Reference: CMD 109 14 - 18
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Project Clearance Committee Review: 3,018.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Traffic Study Report Review Engineering /
(without EIR) LPD Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by: Full Cost: 3,018.58$
Finance
Cost Analysis for Development - CAD - 474.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Minor (accessory dwelling unit, single Engineering /
family home, and up to 4 residential units) LPD Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by: Full Cost: 474.81$
Finance
Cost Analysis for Development - CAD - 1,159.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Major Engineering /
LPD Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by: Full Cost: 1,159.46$
Finance
Reference: CMD 109 14 - 19
Department / Division: Public Works / Engineering / LPD; Design; Traffic Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Shared Mobility Permit and Impound Fees Charged by: Date 4/29/2025 Objective: Recover Cost Engineering Prop 26 Exception: 2
1) Application Fee (per Operator) 3,893.00$ Yes Res. No. 25-9437 Full Cost: 3,893.86$ Adjust using general COL Collected by:
2) Annual Fee (per Operator) 30,788.00$ Yes Finance Full Cost: 30,788.22$ Adjust using general COL 3) Per Device Fee (excluding the first 60 77.00$ Yes Full Cost: 78.33$ Adjust using general COL Devices)
4) Per Additional Fee (for authorized 38.00$ Yes Full Cost: 38.63$ Adjust using general COL increases to the original number of
permitted devices)
5) Impound Fee (per device) 341.00$ Yes Full Cost: 342.13$ Adjust using general COL Reference: CMD 109 14 - 20

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE

PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION

JUSTIFICATION FOR INCREASE IN FEES, RATES, AND CHARGES
NOTE 1: Fees, rates, and charges to recover costs for these types of fees/reimbursements for public improvements are proposed to decrease 0.3% from 2024/25 fees, rates, and charges, consistent with the percentage change in the Construction Cost Index (January 2024 to January 2025) as published by the Engineering News-Record.

NOTE 2: Fees, rates, and charges to recover costs for Field Marking – Traffic Signal Engineering Services is equal to the Field Marking – Fiber which services are performed by the same Silicon Valley Power (SVP) field staff.

NOTE 3: City is required to charge a pro-rated sanitary sewer conveyance fee for accessory dwelling units per City Ordinance 1968. An accessory dwelling unit is equivalent to an apartment and will be charged a sanitary sewer conveyance fee equivalent to 62.9% of the sanitary sewer conveyance fee for a single-family home. This 62.9% is based on the ratio of an apartment daily average discharge of 154 gallons per day (gpd) over a single-family home daily average discharge of 245 gpd (154 gpd/245 gpd = 0.629).
14 - 21
Department / Division: Public Works / Street / Storm Drain Division Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

1. Active construction site inspections 668.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost MRP requires inspection of of projects over one (1) acre in size Storm Drain sites once a month during wet and high priority sites during wet Res. No. 25-9437 Prop 26 Exception: 1, 2 season. 7 inspections per year season (Oct. - Apr.) as required by Collected by: required if permit is open Provision C.6 of MRP Storm Drain & Full Cost: 669.24$ during wet season, plus Finance reinspections as needed.

2. Industrial / commercial facility 770.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Inspection frequency of stormwater inspections as required Storm Drain businesses that have filed a by Provision C.4 of MRP (Tier 1) Res. No. 25-9437 Prop 26 Exception: 1, 2 Notice of Intent (NOI) is once Collected by: per year as required by the
Storm Drain & Full Cost: 770.50$ Municipal Regional Finance Stormwater NPDES Permit.

3. Industrial / commercial facility 516.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Businesses that received a stormwater inspections as required Storm Drain Notice of Violation during an by Provision C.4 of MRP (Tier 2) Res. No. 25-9437 Prop 26 Exception: 1, 2 industrial / commercial Collected by: stormwater inspection the
Storm Drain & Full Cost: 517.36$ previous year are required to Finance be inspected the following year.

4. Operation & maintenance inspection Charged by: Date 4/29/2025 Objective: Recover Cost Operation & maintenance of stormwater treatment systems Storm Drain inspections required on an installed on projects as required Res. No. 25-9437 Prop 26 Exception: 1, 2 annual basis to ensure the by Provision C.3 of MRP Collected by: stormwater treatment systems Storm Drain & are properly maintained.

Tier 1: 1 - 25 Treatment Measures 922.00$ Yes Finance Full Cost: 922.38$ Tier 2: 26 - 50 Treatment Measures 1,124.00$ Yes Full Cost: 1,124.90$ Tier 3: 50+ Treatment Measures 1,326.00$ Yes Full Cost: 1,327.42$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 15 - 1
Department / Division: Public Works / Street / Storm Drain Division Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

5. Operation & Maintenance Agreement 890.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Administration of permanent Storm Drain
stormwater treatment systems Res. No. 25-9437 Prop 26 Exception: 1, 2 installed on projects as required by Collected by:

Provision C.3 of MRP Storm Drain & Full Cost: 890.10$
Finance

6. Stormwater Management Planning 3,632.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Application Plan review as required Engineering /
by Provision C.3 of MRP LPD Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by: Full Cost: 3,632.85$
Planning

7. Stormwater Management Building 3,632.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Application Improvement plans review Storm Drain
for stormwater management Res. No. 25-9437 Prop 26 Exception: 1, 2 compliance with Provision C.3 of MRP Collected by:

Building Full Cost: 3,632.85$

8. Private Land Drainage Area (PLDA) 731.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Program Inspection Fee Storm Drain
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 731.75$
Reference: CMD 109 15 - 2
Department / Division: Public Works / Street / Storm Drain Division Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor

9. Storm Drain Medallion Fee 26.00$ Yes Charged by: Date 4/23/2024 Objective: Recover Cost Storm Drain
Res. No. 24-9316 Prop 26 Exception: 1, 2
Collected by:

Building Full Cost: 27.00$

10. Building Demolition Polychlorinated 669.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost biphenyls (PCBs) Inspection Fee Storm Drain
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 670.02$
Reference: CMD 109 15 - 3
Department / Division: Public Works / Street / Street Maintenance Division Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept /
Div Comments
Pavement Restoration Charge Charged by: Date 4/29/2025 Objective: Recover Cost Pavement restoration charges Street are applied on work associated

1. First 80 cubic feet 4,456.00$ Yes Res. No. 25-9437 Prop 26 Exception: 1, 2 with utility street opening Collected by: encroachment permits
Street & Full Cost: 4,456.97$ associated with repair of

2. Each additional cubic foot 42.00$ Yes Finance existing City infrastructure, not utility trench work consisting
of installation of new main and
lateral lines.

Engineering Plan Review per sheet
Charged by: Date 4/29/2025 Objective: Recover Cost Fee is applicable to trench (Streets) Engineering repairs for City utilities street Res. No. 25-9437 Prop 26 Exception: 1, 2 opening permits.

1. First three (3) reviews 183.00$ Yes Collected by:

Engineering & Full Cost: 183.97$

2. Each subsequent review 40.00$ Yes Finance Concrete Removal / Replace Charge - Charged by: Date 4/29/2025 Objective: Recover Cost Fee is applicable to trench Curb / Gutter Street repairs for City utilities street
Res. No. 25-9437 Prop 26 Exception: 1, 2 opening permits.

1. Base (administrative costs) 639.00$ Yes Collected by:

Street & Full Cost: 639.63$

2. Per linear ft. 75.00$ Yes Finance Concrete Removal / Replace Charge -
Charged by: Date 4/29/2025 Objective: Recover Cost Fee is applicable to trench Sidewalk Street repairs for City utilities street
Res. No. 25-9437 Prop 26 Exception: 1, 2 opening permits.

1. Base (administrative costs) 639.00$ Yes Collected by:

Street & Full Cost: 639.63$

2. Per square ft. 19.00$ Yes Finance

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 15 - 4
Department / Division: Public Works / Street / Street Maintenance Division Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept /
Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Traffic Sign Fabrication 987.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Fee is for traffic sign Street fabrication.

Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Street & Full Cost: 987.39$
Finance
Reference: CMD 109 15 - 5
Department / Division: Public Works / Street / Parkways & Boulevards Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
Street Tree Removal 1,051.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Contract Costs:
per tree Parkways & 1-3" dbh: $55
Boulevards Res. No. 25-9437 Prop 26 Exception: 1, 2 4-6" dbh: $110 Plus contract cost to 7-12" dbh: $237
remove tree & stump as Collected by: Full Cost: 1,051.56$ 13-24" dbh: $1,067 specified in the Finance 25-36" dbh: $1,784
Comments Section are 37-48" dbh: $2,703
added to the Fee. 49" and above dbh: $2,163
City Tree Planting 2,081.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Includes tractor, auger, Includes in-lieu tree planting for per tree Engineering fertilizer, compost & stakes private development tree removals Res. No. 25-9437 Prop 26 Exception: 1, 2, 6 and 24" box tree with root Collected by: barrier.

Finance Full Cost: 2,081.39$
Parkways and Boulevards Plan Review 605.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Engineering
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 605.48$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 15 - 6
Department / Division: Public Works / Street / Solid Waste Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
Non-exclusive franchise hauler 1,521.00$ No Charged by: Date 4/29/2025 Objective: User Fee Haulers that want to charge for application fee Solid Waste solid waste collection services Res. No. 25-9437 Prop 26 Exception: 2 at properties zoned for Collected by: Industrial use have agreements
Solid Waste & Full Cost: 1,521.45$ approved by Council at a Finance Public Hearing.

Solid Waste Management Planning 1,914.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Application Plan review as required by Solid Waste
City Municipal Code Res. No. 25-9437 Prop 26 Exception: 1, 2 Collected by:

Planning Full Cost: 1,914.75$
Solid Waste Management Buliding Permit 1,914.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Application Improvement plans review Solid Waste
for solid waste management compliance Res. No. 25-9437 Prop 26 Exception: 1, 2 with City's municipal codes Collected by:

Building Full Cost: 1,914.75$
Construction & Demolition (C&D) waste 514.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost management: Processing solid waste Solid Waste
management and Green Halo Res. No. 25-9437 Prop 26 Exception: 1, 2 reconciliation Collected by:

Building Full Cost: 514.91$
Cleanup Campaign Debris Bag Fee 36.00$ Yes Charged by: Date 4/29/2025 Objective: Recover Cost Solid Waste
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 36.43$

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 15 - 7

Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
New 1" water service 23,981.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 23,982.96$ included.

New 1" water service and abandon 29,747.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, existing service SFR Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 29,748.46$ included.

New 2" water service 26,952.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 26,953.41$ included.

New 3" water service 55,028.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 55,029.23$ included.

New 4" water service 58,665.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 58,666.20$ included.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 16 - 1
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
New 6" water service 58,982.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 58,982.64$ included.

New 8" water service 60,415.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 60,415.29$ included.

New 4" water service (Dual Meter 64,571.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Service) Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 64,571.67$ included.

New 6" water service (Dual Meter 66,541.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Service) Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 66,541.70$ included.

New 8" water service (Dual Meter 71,266.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, Service) Water backflows, Encroachment
Res. No. 25-9437 Prop 26 Exception: 2 Permits, Soil Disposal, and Collected by: Pavement Restoration not
Engineering Full Cost: 71,267.70$ included.

Reference: CMD 109 16 - 2
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
New 1" Water Meter - Device Cost Only 232.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Water
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Engineering Full Cost: 233.60$
New 1" water meter and backflow 649.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes cost of meter and RP preventer - device cost only Water backflow prevention device.

Res. No. 25-9437 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 650.16$ based on the discretion of the Water & Sewer Utilities.

New 1½" water meter and backflow 1,779.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes cost of meter and RP preventer - device cost only Water backflow prevention device.

Res. No. 25-9437 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 1,780.16$ based on the discretion of the Water & Sewer Utilities.

New 2" water meter and backflow 2,149.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes cost of meter and RP preventer - device cost only Water backflow prevention device.

Res. No. 25-9437 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 2,150.69$ based on the discretion of the Water & Sewer Utilities.

New 3" water meter and backflow 5,427.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes cost of meter and RP preventer - device cost only Water backflow prevention device.

Res. No. 25-9437 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 5,427.93$ based on the discretion of the Water & Sewer Utilities.

Reference: CMD 109 16 - 3
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
New 4" water meter and backflow 7,165.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes cost of meter and RP preventer - device cost only Water backflow prevention device.

Res. No. 25-9437 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 7,165.51$ based on the discretion of the Water & Sewer Utilities.

New 6" water meter and backflow 14,884.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes cost of meter and RP preventer - device cost only Water backflow prevention device.

Res. No. 25-9437 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 14,884.52$ based on the discretion of the Water & Sewer Utilities.

New 8" water meter and backflow 20,674.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes cost of meter and RP preventer - device cost only Water backflow prevention device.

Res. No. 25-9437 Prop 26 Exception: 2 Fees for the meter or backflow Collected by: can be assessed separately
Engineering Full Cost: 20,674.93$ based on the discretion of the Water & Sewer Utilities.

New Fire Hydrant 45,281.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost For hydrant requested by Water property owner / developer.

Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Engineering Full Cost: 45,281.33$
Reference: CMD 109 16 - 4
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
New Fire Service Charged by: Date 4/29/2025 Objective: Recover Cost Cost for DCDA, RPDA, (Installation of fire service line) Water Prop 26 Exception: 2 Encroachment Permit, Soil Res. No. 25-9437 Disposal, and Pavement
2" fire service 25,043.00$ No Collected by: Full Cost: 25,044.75$ Restoration not included.

Engineering
4" fire service 57,836.00$ No Full Cost: 57,837.68$ 6" fire service 58,585.00$ No Full Cost: 58,585.65$ 8" fire service 59,607.00$ No Full Cost: 59,608.63$ 10" fire service 62,311.00$ No Full Cost: 62,311.67$ Fire Service Upgrade Charged by: Date 4/29/2025 Objective: Recover Cost Cost for DCDA, RPDA, or (Upgrade device to standard DCDA Water Prop 26 Exception: 2 Encroachment Permit not or RPDA) Res. No. 25-9437 included.
2" fire service 11,526.00$ No Collected by: Full Cost: 11,526.90$ Engineering
4" fire service 23,497.00$ No Full Cost: 23,498.03$ 6" fire service 23,690.00$ No Full Cost: 23,690.20$ 8" fire service 23,914.00$ No Full Cost: 23,915.75$ 10" fire service 24,887.00$ No Full Cost: 24,888.10$ Reference: CMD 109 16 - 5
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Backflow Preventer - device cost only Charged by: Date 4/29/2025 Objective: Recover Cost Water Prop 26 Exception: 2
2" DCDA 1,114.00$ No Res. No. 25-9437 Full Cost: 1,115.05$ Collected by:
4" DCDA 3,500.00$ No Engineering Full Cost: 3,500.48$ 6" DCDA 5,233.00$ No Full Cost: 5,234.61$ 8" DCDA 9,737.00$ No Full Cost: 9,737.36$ 10" DCDA 14,006.00$ No Full Cost: 14,007.68$ Charged by: Date 4/29/2025 Objective: Recover Cost
Water Prop 26 Exception: 2
2" RPDA 1,114.00$ No Res. No. 25-9437 Full Cost: 1,115.05$ Collected by:
4" RPDA 4,797.00$ No Engineering Full Cost: 4,797.34$ 6" RPDA 7,510.00$ No Full Cost: 7,511.87$ 8" RPDA 14,302.00$ No Full Cost: 14,303.41$ 10" RPDA 18,870.00$ No Full Cost: 18,870.61$ Field Fire Hydrant Flow Test 2,136.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Water
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Finance / Full Cost: 2,136.92$
Municipal Serv.

Reference: CMD 109 16 - 6
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Portable hydrant meter and Deposit 4,032.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Deposit to ensure return of (Includes cost of RP backflow) Water meter, or cover replacement if Res. No. 25-9437 Prop 26 Exception: 1, 2 lost or damaged. $655 of the Collected by: deposit is non-refundable.

Finance / Full Cost: 4,033.23$
Municipal Serv.

Recycled hydrant meter and Deposit 4,032.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Deposit to ensure return of (Includes cost of RP backflow) Water meter, or cover replacement if Res. No. 25-9437 Prop 26 Exception: 1, 2 lost or damaged. $655 of the Collected by: deposit is non-refundable.

Finance / Full Cost: 4,033.23$
Municipal Serv.

Water Meter Test 517.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Non-routine testing of water Water meter when customer questions
Res. No. 25-9437 Prop 26 Exception: 1, 2 meter accuracy. Refundable if Collected by: meter falls outside accepted
Finance / Full Cost: 939.26$ range.

Municipal Serv.

Utility Engineering Plan Review Charged by: Date 4/29/2025 Objective: Recover Cost Water Prop 26 Exception: 3
Utility Engineering Plan Check for SFH 687.00$ No Res. No. 25-9437 Full Cost: 688.19$ Remodel (per plan set) - includes 3 checks Collected by:

Engineering
Utility Engineering Plan Check for Projects up 1,220.00$ No Full Cost: 1,220.70$ Includes all projects with dry to $25K (per plan set) - includes 3 checks utility installation.

Utility Engineering Plan Check for Projects 2,949.00$ No Full Cost: 2,950.70$ Includes all projects with dry over $25K (per sheet) - includes 3 checks utility installation.

Utility Engineering Plan Check (per plan set 746.00$ No Full Cost: 747.19$ Includes all projects with dry for Projects up to $25K and per sheet for utility installation.

Projects over $25K) - 4th and subsequent
review
Reference: CMD 109 16 - 7
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Utility Engineering Inspection * Charged by: Date 4/29/2025 Objective: Recover Cost * Use this fee for all SFH Water Prop 26 Exception: 3 remodels
$0 - $15K 648.00$ No Res. No. 25-9437 Full Cost: 649.46$ Collected by:
$15,001-$25K-base + 13.73% of cost 1,298.00$ No Engineering Full Cost: 1,298.93$ above $15K
$25,001-$50K-base + 11.87% of cost 2,848.00$ No Full Cost: 2,848.32$ above $25K
$50,001-$100K-base + 2.22% of cost 6,197.00$ No Full Cost: 6,197.58$ above $50K
$101K-$200K-base + 4.22% of cost 7,449.00$ No Full Cost: 7,449.93$ above $100K
$201K-$500K-base + 3.03% of cost 12,208.00$ No Full Cost: 12,208.86$ above $200K
$501K-$1M-base + 0.67% of cost above 22,478.00$ No Full Cost: 22,478.13$ $500K
>$1M; base 26,235.00$ No Full Cost: 26,235.18$ >$1M for each add'l $500K or fraction 8,076.00$ No Full Cost: 8,076.11$ thereof
Water Efficiency Review 252.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Water
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 252.54$
Reference: CMD 109 16 - 8
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Water Supply Assessment Preparation 15,421.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Water Supply Assessment Water Prop 26 Exception: 6 prepartaion services rendered Supplemental Assessment Preparation 9,869.00$ No Res. No. 25-9437 by the Water Utility.

Collected by: Full Cost: 15,421.50$
Finance Required due to changes in
Full Cost: 9,869.76$ project.

Water reconnection fee - standard 277.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost service reconnection per account Water Penalty
Res. No. 25-9437 Prop 26 Exception: 1, 2, 5
Water meter replacement / reconnection 505.00$ No Collected by:
fee due to meter tampering / illegal access per account Finance / Full Cost: 430.54$ Municipal Serv.

Fee to fix meter plus Full Cost: 680.45$
two (2) times the
estimated cost of
services used
Water service abandonment (2" and smaller) 10,594.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of Encroachment Water Permit, Soil Disposal, and
Res. No. 25-9437 Prop 26 Exception: 1, 2 Pavement Restoration not Collected by: included.

Finance Full Cost: 10,594.30$
Water service abandonment (3" and larger) 22,646.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of Encroachment Water Permit, Soil Disposal, and
Res. No. 25-9437 Prop 26 Exception: 1, 2 Pavement Restoration not Collected by: included.

Finance Full Cost: 22,647.24$
Reference: CMD 109 16 - 9
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Water service relocation 8,101.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost For service relocation of no Water more than 4 feet from the
Res. No. 25-9437 Prop 26 Exception: 1, 2 existing location.

Collected by: Note: The cost of Encroachment
Finance Full Cost: 8,101.98$ Permit, Soil Disposal, and Pavement Restoration not
included.

Field Marking - Water Charged by: Date 4/29/2025 Objective: Recover Cost Water Prop 26 Exception: 2
Up to 50 ft. of excavation 307.00$ No Res. No. 25-9437 Full Cost: 308.17$ Collected by:

Over 50 ft. - each additional 50 ft. or 125.00$ No Finance Full Cost: 125.24$ fraction thereof of excavation
Field Marking - Recycled Water Charged by: Date 4/29/2025 Objective: Recover Cost Water Prop 26 Exception: 2
Up to 50 ft. of excavation 307.00$ No Res. No. 25-9437 Full Cost: 308.17$ Collected by:

Over 50 ft. - each additional 50 ft. or 125.00$ No Finance Full Cost: 125.24$ fraction thereof of excavation
Water and Fire Service Tap (2" and smaller) 1,201.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes installation and Water inspection of water main tap
Res. No. 25-9437 Prop 26 Exception: 2 only.

Collected by:

Finance Full Cost: 1,202.47$
Water and Fire Service Tap (4", 6", and 8") 1,345.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes installation and Water inspection of water main tap
Res. No. 25-9437 Prop 26 Exception: 2 only.

Collected by:

Finance Full Cost: 1,346.32$
Reference: CMD 109 16 - 10
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Water and Fire Service Tap (10" and 12") 1,806.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Includes installation and Water inspection of water main tap
Res. No. 25-9437 Prop 26 Exception: 2 only.

Collected by:

Finance Full Cost: 1,806.60$
Insertion Valve Installation Charged by: Date 4/29/2025 Objective: Recover Cost Includes installation and Water Prop 26 Exception: 2 inspection of valve only.
4" Valve 16,612.00$ No Res. No. 25-9437 Full Cost: 16,613.76$ Collected by:
6" Valve 17,530.00$ No Engineering Full Cost: 17,530.87$ 8" Valve 18,333.00$ No Full Cost: 18,334.07$ 10" Valve 21,931.00$ No Full Cost: 21,932.36$ 12" Valve 23,703.00$ No Full Cost: 23,704.47$ Insertion Valve Installation Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of Encroachment Water Prop 26 Exception: 2 Permit, Soil Disposal, and
4" Valve (excavation included) 28,970.00$ No Res. No. 25-9437 Full Cost: 28,971.39$ Pavement Restoration not Collected by: included.
6" Valve (excavation included) 29,887.00$ No Engineering Full Cost: 29,888.51$ 8" Valve (excavation included) 30,690.00$ No Full Cost: 30,691.71$ 10" Valve (excavation included) 34,289.00$ No Full Cost: 34,290.01$ 12" Valve (excavation included) 36,061.00$ No Full Cost: 36,062.11$ Project Clearance Committee - Utility 1,438.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Engineering / Subcommittee Review Water
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 1,439.17$
Reference: CMD 109 16 - 11
Department / Division: Water & Sewer Utilities / Water Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Hold Harmless Agreement 1,076.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Water
Res. No. 25-9437 Prop 26 Exception: 2
Collected by:

Finance Full Cost: 1,076.40$
Fire Flow (Hydraulic Model) Charged by: Date 4/29/2025 Objective: Recover Cost Water Prop 26 Exception: 2
Single Family Homes (SFH) 959.00$ No Res. No. 25-9437 Full Cost: 959.00$ Collected by:

Others, Excluding SFH 1,404.00$ No Finance Full Cost: 1,404.00$ Development Impact Analysis 2,139.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost This is a hydraulic modeling fee Water for new development.

Res. No. 25-9437 Prop 26 Exception: 6
Collected by:

Finance Full Cost: 2,139.00$
Water Service Upgrade of Existing Service Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of meters, excluding Device Cost Water Prop 26 Exception: 2 backflows, Encroachment Res. No. 25-9437 Permit, Soil Disposal, and
5/8" x 3/4" water services and backflow 11,486.00$ No Collected by: Full Cost: 11,486.62$ Pavement Restoration not preventer Engineering included.
1" water service and backflow preventer 11,486.00$ No Full Cost: 11,486.62$ 1-1/2" water service and backflow preventer 11,524.00$ No Full Cost: 11,525.74$ 2" water service and backflow preventer 11,524.00$ No Full Cost: 11,525.74$ 3" water service and backflow preventer 11,910.00$ No Full Cost: 11,911.24$ Reference: CMD 109 16 - 12
Department / Division: Water & Sewer Utilities / Sewer Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
Sewer lateral cleanout 2,507.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost When no cleanout exists, it 4 inch lateral Sewer is necessary that one be
Res. No. 25-9437 Prop 26 Exception: 1, 2 installed in order for City to Collected by: have access to sewer lateral
Finance Full Cost: 11,641.39$ for courtesy maintenance.

Cleanout box is included.

Sewer lateral cleanout 11,829.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost When no cleanout exists, it 6 inch lateral or larger Sewer is necessary that one be Res. No. 25-9437 Prop 26 Exception: 1, 2 installed in order for City to Collected by: have access to sewer lateral
Finance Full Cost: 11,829.87$ for courtesy maintenance.

Cleanout box is included.

Cleanout box only 391.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Sewer
Res. No. 25-9437 Prop 26 Exception: 1, 2
Collected by:

Finance Full Cost: 1,069.58$
4" sewer lateral installation 45,667.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of Encroachment Sewer Permit, Soil Disposal, and
Res. No. 25-9437 Prop 26 Exception: 2 Pavement Restoration not Collected by: included.

Engineering Full Cost: 45,667.51$ No cleanout or box cost included.
6" sewer lateral installation 45,667.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of Encroachment Sewer Permit, Soil Disposal, and
Res. No. 25-9437 Prop 26 Exception: 2 Pavement Restoration not Collected by: included.

Engineering Full Cost: 45,667.51$ No cleanout or box cost included.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 16 - 13
Department / Division: Water & Sewer Utilities / Sewer Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
8" sewer lateral installation 45,667.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Note: The cost of Encroachment Sewer Permit, Soil Disposal, and
Res. No. 25-9437 Prop 26 Exception: 2 Pavement Restoration not Collected by: included.

Engineering Full Cost: 45,667.51$ No cleanout or box cost included.

Sewer Lateral Video Inspection 525.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Video inspection of existing Sewer lateral to determine that its
Res. No. 25-9437 Prop 26 Exception: 2 replacement is not required Collected by: as a condition of
Finance Full Cost: 1,037.07$ redevelopment.

Encroachment Permit: Charged By: Date 4/29/2025 Objective: Recover Cost See Article 2 of Chapter 3.1 Field Marking - Sanitary Sewer Engineering / of Div. 5 of Title 1 of the LPD Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 Government Code.

Up to 50 ft. of excavation 307.00$ No Full Cost: 308.17$ Collected By:

Over 50 ft. - each additional 50 ft. or 307.00$ No Finance Full Cost: 308.17$ fraction thereof of excavation plus
125.00$ No Full Cost: 125.24$
each add'l 50 ft or
fraction thereof
Fats, Oil and Grease (FOG) Charged By: Date 4/29/2025 Objective: Recover Cost For new building permit Building Division applicants
FOG Plan Review and Inspection Fee 2,819.00$ No Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 (Building Permits) Collected By: Combine plan review and Building Division Full Cost: 2,819.34$ permit into one fee Reference: CMD 109 16 - 14
Department / Division: Water & Sewer Utilities / Sewer Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Short Term Wastewater Discharge Permit 476.00$ No Charged By: Date 4/29/2025 Objective: Recover Cost Use per HCF / per 1,000 gal + ($5.29 / HCF Engineering / of discharge and a $460
or $7.07 / 1,000 gal) LPD Res. No. 25-9437 Prop 26 Exception: 1, 2, 3 processing fee.

Collected By: Full Cost: 476.10$
Finance
Wastewater Treatment Plant Capacity Fee Charged By: Date 8/22/2017 Objective: Recover Cost Accessory Dwelling Unit Engineering / Charge per City Ordinance
Residential Dwelling Unit 1,187.00$ No LPD Ord. No. 1968 Prop 26 Exception: 2 1968 passed by Council on per dwelling unit 8/22/2017.

Collected By: Full Cost: 2,464.28$
Accessory Dwelling Unit 747.00$ No Finance per accessory
dwelling unit
Wastewater Treatment Plant Capacity Fee Charged By: Date 4/18/2017 Objective: Recover Cost Engineering /
Non-Residential 4.47$ No LPD Ord. No. Prop 26 Exception: 6 per gallon, per day
Collected By: Full Cost: 10.52$
Finance
Reference: CMD 109 16 - 15
Department / Division: Water & Sewer Utilities / Solar Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments
Solar pool heating system 5,510.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Costs are recovered through Installation Fee plus Water / Solar Prop 26 Exception: N/A the combination of installation Res. No. 25-9437 fees and monthly service
319.00$ Collected by: Full Cost: 17,338.32$ charges, and recoverable per panel Finance system components.

Full Cost: 1,083.65$
Solar domestic hot water system Actual Cost No Charged by: Date 6/9/2009 Objective: Recover Cost Costs are recovered through installation fee Water / Solar the combination of installation Single-family fee Res. No. Prop 26 Exception: N/A fees and monthly service Collected by: charges, and recoverable
Finance Full Cost: Actual Cost system components.

Solar domestic hot water system Actual Cost No Charged by: Date 3/14/1985 Objective: Recover Cost Installation fees based on cost installation fee Water / Solar of labor and permanently- Multi-family fee Res. No. Prop 26 Exception: N/A installed materials. Example Collected by: for system to serve 10
Finance Full Cost: Actual Cost dwelling units. Remaining costs recovered by monthly
service charges.

Solar domestic hot water system panel 644.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Costs are recovered through removal and replacement fee per panel Water / Solar the combination of installation Res. No. 25-9437 Prop 26 Exception: N/A fees and monthly service Collected by: charges, and recoverable
Finance Full Cost: 3,891.60$ system components.

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Reference: CMD 109 16 - 16
Department / Division: Water & Sewer Utilities / Solar Resolution: 25-9437 Date Approved: 4/29/2025 Description of Fee, Rate, or Charge Current Fee
Technology Fee
(3.37%) Applies
(Yes or No)
Charging Dept /
Div
---------------
Collecting Dept
/ Div Comments

CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Date Fee Last
Changed
--------------
Ordinance /
Resolution Number
& Date
Fee Detail
Objective
Prop 26 Exception
(See Reader's Guide)
Full Cost Factor
Solar pool heating system panel removal 391.00$ No Charged by: Date 4/29/2025 Objective: Recover Cost Costs are recovered through and replacement fee per panel Water / Solar the combination of installation Res. No. 25-9437 Prop 26 Exception: N/A fees and monthly service Collected by: charges, and recoverable
Finance Full Cost: 3,891.60$ system components.
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 16 - 17

Fee Section Page No.
2-Way Elevator Permit Fire 9 - 21
10-Day Letter for House Meter Finance 8 - 4
Aboveground Petroleum Storage Tank Program Fire 9 - 51
Access Control and Traffic Calming Fire 9 - 18
Access Controlled Egress Fire 9 - 22
Active Construction Site Inspections of Projects Public Works 15 - 1 Additional Temporary Tent, Canopy or Air Supported Structure Fire 9 - 19 Addressing Community Development 4 - 17
Administrative Citations Fire 9 - 45
Affordable Housing Application Community Development 5 - 2 Affordable Housing Application (BMP) Community Development 5 - 5 AHA Affordable Housing Agreement Community Development 5 - 2 Alarm Permit Police 13 - 1
Alternate Materials and Methods Review (per hour) Community Development 4 - 16 Alternate Materials and Methods Review Fire 9 - 6
Ambulance Transport Fees Fire 9 - 54
Amended Final Map Checking Public Works 14 - 1
Amended Parcel Map and Record of Survey Checking Public Works 14 - 1 Amplified Music Permit Parks and Recreation 12 - 7
Amplified Music Permit Finance 8 - 2
Annexation of Territory to City of Santa Clara Community Development 6 - 5 Appeals Community Development 6 - 4
Application Extension Community Development 4 - 17
Architectural Review Community Development 6 - 6
Assessment District Reapportionment Public Works 14 - 2 Automatic Fire Extinguishing Systems Fire 9 - 6
Automatic Fire Protection System for Spray Booths Fire 9 - 21 Automatic Fire Sprinkler Systems - Existing Fire 9 - 7
Automatic Fire Sprinkler Systems - New Fire 9 - 6
Automatic Fire Sprinkler Systems - Residential 13D Fire 9 - 20 Backflow Preventer - Device Cost Only Water and Sewer Utilities 16 - 6 Backflow Preventer Replacement Fire 9 - 15
Bathroom Remodel Community Development 4 - 19
Below Market Purchase Processing and Transaction Fee Community Development 5 - 5

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
17 - 1
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Billing Service Charge for Late Payment Finance 8 - 3
Bingo Organization Police 13 - 1
Black Line Print of Plans on File Public Works 14 - 7
Block Party Request Finance 8 - 2
Borrowing Materials from Other Libraries (Interlibrary Loan) Library 10 - 1 Building Conformance Fee Community Development 4 - 3
Building Demolition Polychlorinated biphenyls (PCBs) Inspection Public Works 15 - 3 Building Permit Site Clearance Public Works 14 - 17
Building Plans Fire 9 - 8
Burial Materials Processing Parks and Recreation 11 - 13 Burial Permit Filing Parks and Recreation 11 - 7
Business Certificate Information Finance 8 - 1
Business Tax Rental Unit Surcharge Finance 8 - 1
CAD Report for Legal Purposes Police 13 - 1
California Accidental Release Program (CALARP) Fire 9 - 49 Carbon Dioxide Beverage Dispensing System Fire 9 - 24
Carnivals and Fairs Fire 9 - 9
Casket Parks and Recreation 11 - 2
Casket Burial Parks and Recreation 11 - 1
CD for Legal Purposes Police 13 - 1
CD/DVD Materials Citywide 1 - 1
Central Park - Picnic Area Parks and Recreation 12 - 3
Certificate of Compliance Community Development 6 - 8
Certificate of Compliance Processing Public Works 14 - 2 Certificate of Correction Processing Public Works 14 - 2 Change of Name, Address or Business Type as Shown on
Current Certificate
Finance 8 - 1
Chapel Rental Parks and Recreation 11 - 8
Citation Sign Off Police 13 - 2
City Flag Finance 8 - 2
City Plaza Park Gazebo Parks and Recreation 12 - 3
Cleanout Box Only Water and Sewer Utilities 16 - 13
Clean-Up Campaign Debris Bag Public Works 15 - 7
Clearance Letter Police 13 - 2
17 - 2
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Closing Out Sale Police 13 - 2
Closure of an Onsite Hazardous Waste Treatment System Fire 9 - 9 Code Enforcement Re-Inspection Community Development 6 - 12 Collection Agency Fee Library 10 - 2
Color Photographs Police 13 - 2
Combination Agreement/Grant Deed for the Same Lot Public Works 14 - 8 Combustible and Flammable Materials Fire 9 - 38
Commercial Day Care (E3) Fire 9 - 41
Commercial/Multi-Family/Industrial Scaled Permit Community Development 4 - 22 Community Development Department Referrals Fire 9 - 17
Community Garden Space Membership Parks and Recreation 12 - 10 Community Recreation Center Room Rental Parks and Recreation 12 - 1 Compressed Gas Installation Fire 9 - 10
Concrete Removal/Replace Public Works 15 - 4
Construction & Demolition Public Works 15 - 7
Contract Administration Community Development 6 - 11
Cooking Oil Storage Tanks Fire 9 - 10
Copy Fee Citywide 1 - 1
Copies Public Works 14 - 6
Corrosives Fire 9 - 38
Cost Analysis for Development Public Works 14 - 19
Credit Card Convenience Fee Citywide 1 - 2
Cremation Parks and Recreation 11 - 2
Crime Analysis Reports Police 13 - 3
Cryogenic Fluids Fire 9 - 38
Custom Hourly Rate Parks and Recreation 11 - 8
Delinquent Payment of Business Certificate Tax Finance 8 - 1 Delinquent Reconnect Finance 8 - 4
Delinquent Service Letter Finance 8 - 3
Design Review/Consultation Fire 9 - 24
Development Agreement Community Development 6 - 8
Development Impact Analysis Water and Sewer Utilities 16 - 12 Development Impact Fees Community Development 5 - 5
Disinter and Reinter Casket into Same Grave Parks and Recreation 11 - 3 17 - 3
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Disinternment Parks and Recreation 11 - 2
Dispatch Service Required for Special Events Police 13 - 3 Distribution Pole Contact Electric Utility 7 - 8
Document Recordation Public Works 14 - 8
Driving Under the Influence Emergency Response Police 13 - 3 Duplicate Business Certificate Finance 8 - 2
Electric Disconnection Fee Electric Utility 7 - 5
Electric Equipment Relocation Electric Utility 7 - 7
Electric Reconnection Fee Electric Utility 7 - 5
Electric Replacement/Reconnection Fee Due to Meter
Tampering/Illegal Access
Electric Utility 7 - 6
Electric System Damage Electric Utility 7 - 4
Electrical Permit Community Development 4 - 3
Emergency Alarm Systems Fire 9 - 10
Emergency Responder Radio Coverage System Fire 9 - 10
Encroachment Agreement Application Public Works 14 - 7
Encroachment Permit Public Works 14 - 3
Encroachment Permit: Field Marking - Sanitary Sewer Water and Sewer Utilities 16 - 14 Energy Storage Systems Fire 9 - 23
Engineering Plan Check - Electric Electric Utility 7 - 6 Engineering Plan Review (Streets) Public Works 15 - 4
Engineering Referrals Fire 9 - 11
Environmental Review Community Development 6 - 7
Environmental Impact Report Fire 9 - 11
Equiment Rentals Parks and Recreation 12 - 4
Exhibit and Trade Shows Fire 9 - 12
Existing Improvements Public Works 14 - 12
Expedited Plan Review Service Community Development 4 - 24 Expired Construction Permit Fire 9 - 45
Facility Rental Fire 9 - 3
False Alarm Calls Police 13 - 3
False Alarm Responses Fire 9 - 44
Fats, Oils, and Grease (FOG) Water and Sewer Utilities 16 - 14 Fee for Work Commencing Before Permit Issuance Community Development 4 - 24 17 - 4
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Field Fire Hydrant Flow Test Water and Sewer Utilities 16 - 6 Field Marking - Fiber Electric Utility 7 - 7
Field Marking - Recycled Water Water and Sewer Utilities 16 - 10 Field Marking - Water Water and Sewer Utilities 16 - 10 Field Preparation Parks and Recreation 12 - 6
Field Sample - Environmental Laboratory Analysis Fire 9 - 53 Fields and Turf Areas Reservations Parks and Recreation 12 - 6 Final Map Checking Public Works 14 - 1
Fingerprinting Police 13 - 4
Fire Alarm Systems Fire 9 - 12
Fire Alarm Systems with Pre-Wire Inspection Required Fire 9 - 13 Fire Flow (Hydraulic Model) Water and Sewer Utilities 16 - 12 Fire Hydrant Water and Sewer Utilities 16 - 4
Fire Pump Installation Fire 9 - 14
Fire Safety Demolition/Construction Plan Fire 9 - 22
Fire Service Water and Sewer Utilities 16 - 5
Fire Service Upgrade Water and Sewer Utilities 16 - 5
First Tent, Canopy or Air Supported Structure Fire 9 - 19 Flammable and Combustible Liquids Materials Fire 9 - 38 Flat Marker Parks and Recreation 11 - 5
Flood Zone Verification Community Development 6 - 10
Foundation Repair / Seismic Upgrade Community Development 4 - 19 General Plan / Advanced Planning Surcharge Community Development 4 - 2 General Plan Amendment Community Development 6 - 8
Grading Permit Community Development 4 - 14
Grading Plan Review Community Development 4 - 13
Hazardous Material Tool/Equipment Installation Fire 9 - 15 Hazardous Materials Business Plan Fire 9 - 52
Hazardous Materials Closure Plan Fire 9 - 15
Hazardous Materials Tool/Equipment Modification Fire 9 - 23 Hazardous Waste Generator Fire 9 - 48
High-Piled Combustible Storage Fire 9 - 15
High-Rise Fire 9 - 41
High-Rise Fire Protection Water Storage Tank Fire 9 - 14 17 - 5
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
High-Rise R-1/R-2 Fire 9 - 41
Highly Toxic Materials Fire 9 - 38
Historical & Landmarks Community Development 6 - 11
Hold Harmless Agreement Water and Sewer Utilities 16 - 12 Hospitals Fire 9 - 43
Hourly Rate for Miscellaneous Services Fire 9 - 26
Hourly Rate (Personnel) Parks and Recreation 11 - 7
Hourly Staff (As-Needed) Assigned to Facility Parks and Recreation 12 - 4 ID Card Renewal/Replacement Police 13 - 4
In-House Planning Rate Community Development 6 - 12
Industrial/Commercial Facility Stormwater Inspections Public Works 15 - 1 Insertion Valve Installation Water and Sewer Utilities 16 - 11 Inscribe Shutters or Grave Markers Parks and Recreation 11 - 4 Installation of a Flower Vase and Ring on a Niche Parks and Recreation 11 - 4 Installation of a Monobar, Emblem, Flower Vase, or Ring on a Crypt Parks and Recreation 11 - 4 Installation of a Niche Plaque Parks and Recreation 11 - 5 Installation of Grave Marker Parks and Recreation 11 - 5 Jails Fire 9 - 43
Jump House Permit Parks and Recreation 12 - 8
Jury Fees Citywide 1 - 2
Knox Box Installation Fire 9 - 16
Late Filing of Documents/Reports/Information Fire 9 - 46 Late Payment of CUPA Fire 9 - 46
Late Payment of Operational Permits Fire 9 - 46
Late Payment Penalty for Multi-Family Monitoring Fee Community Development 5 - 6 Licensed Care Facility Fire 9 - 26
Liquefied Petroleum Gas Fire 9 - 39
Liquefied Petroleum Gases - Installation Per Tank Fire 9 - 16 Load Development Electric Utility 7 - 3
Loan Demand Payoff Community Development 5 - 1
Lobbying Activities City Clerk 2 - 1
Lot Line Adjustment Processing Public Works 14 - 2
Mailed Notices Community Development 6 - 4
Maintenance Fee Parks and Recreation 11 - 4
17 - 6
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Maps Community Development 6 - 4
Massage Application / Inspections Police 13 - 4
Master Plan Fee Community Development 4 - 16
Mechanical Permit Community Development 4 - 6
Meter Reading More Than Once Per Month Finance 8 - 4
Meter Test Deposit Electric Utility 7 - 4
Methane Venting and Detection Systems Fire 9 - 16
Microfilm Copies Fire 9 - 47
Mills Act Application Community Development 6 - 9
Mills Act Plaques Community Development 6 - 9
Minor Modifications Community Development 6 - 2
Minor Residential Combination Permits Community Development 4 - 1 Miscellaneous CUPA Inspections, CUPA Plan Reviews or
CUPA Field Sampling
Fire 9 - 53
Miscellaneous Haz Mat Inspections, Haz Mat Plan Reviews or Haz Mat Field Sampling
Fire 9 - 25
Miscellaneous Inspections or Plan Reviews Fire 9 - 25
Mission City Memorial Park Interment Rights and Burial Materials Parks and Recreation 11 - 14 Motor Funeral Escort Police 13 - 5
Multi-Family Loan Conversion Community Development 5 - 3 Multi-Family Loan Origination Community Development 5 - 3 Multi-Family Loan Recapitalization Community Development 5 - 4 Multi-Family (MF) Loan Subordination Request Review Community Development 5 - 1 Multi-Family Monitoring Community Development 5 - 2
Multi-Family Project Refinance Community Development 5 - 4 Multi-Family Project Restructuring - Transfer of Ownership Community Development 5 - 4 Multi-Family Transaction Application Review Community Development 5 - 3 Multi-Story Buildings Fire 9 - 35
Municipal Services Information Finance 8 - 4
Neighborhood Conservation Improvement Program (NCIP) Loan Application Community Development 5 - 1 Neighborhood Parks Parks and Recreation 12 - 8
No-Fee Parade Permit City Manager 3 - 1
Non-Exclusive Franchise Hauler Application Public Works 15 - 7 Off-Duty Employment Police 13 - 6
17 - 7
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Off-Site Parking Community Development 6 - 3
On-Demand Mobile Fueling Site Permit Fire 9 - 21
Onsite Treatment of Hazardous Waste Annual Fee Fire 9 - 49 Open Burnings Fire 9 - 16
Operation & Maintenance Inspection of Stormwater Treatment Systems Public Works 15 - 1 Operational Permits Fire 9 - 27
Organic Materials Fire 9 - 39
Organic Peroxides Fire 9 - 39
Other Inspections and Fees Community Development 4 - 14 Outside 3rd Party Review (public ROW or easements) Public Works 14 - 9 Outside 3rd Party Review (survey or mapping) Public Works 14 - 9 Ovens Fire 9 - 16
Overhead Lines - New Electric Utility 7 - 1
Oversize, Overweight Vehicles Public Works 14 - 16
Outdoor Assembly Event Fire 9 - 26
Overtime Haz Mat Inspection Fire 9 - 25
Overtime Inspection Fire 9 - 25
Overtime Plan Check, Mapping Review Public Works 14 - 9 Overtime Haz Mat Plan Review Fire 9 - 26
Overtime Plan Review Fire 9 - 25
Parcel Map and Record of Survey Checking Public Works 14 - 1 Park Building Room Rentals Parks and Recreation 12 - 2
Parkways and Boulevards Plan Review Public Works 15 - 6 Patrick Henry Drive CFD Formation Community Development 6 - 14 Patrick Henry Drive Specific Plan Area Impact Public Works 14 - 15 Pavement Restoration Public Works 15 - 4
Pawn/Secondhand Dealer Police 13 - 6
Payment Default Citywide 1 - 1
Permit Extension Community Development 4 - 17
Permit Issuance Community Development 4 - 2
Permit to Final (per trade) Community Development 4 - 16 Perpetual Care (Endowment) Parks and Recreation 11 - 9
Phased Permitting/Occupancy Plan Fire 9 - 22
Phased Plan Check (per each phase) Community Development 4 - 16 17 - 8
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Photo CD's Police 13 - 7
Photographs Fire 9 - 47
Photovoltaic Community Development 4 - 18
Plan Duplication Community Development 4 - 17
Plan Revision Fire 9 - 24
Plant Extraction Systems Fire 9 - 24
Plumbing Permit Community Development 4 - 9
Police Reports Police 13 - 7
Pool Demo Community Development 4 - 19
Pool Rentals Parks and Recreation 12 - 9
Portable Hydrant Meter and Deposit Water and Sewer Utilities 16 - 7 Pre-Application Community Development 6 - 10
Preparation of Agreement/Easement/Grant Deed Public Works 14 - 8 Preparation or Peer Review of Technical Report Community Development 6 - 12 Private Land Drainage Area (PLDA) Program Inspection Public Works 15 - 2 Private Security Police 13 - 7
Project Clearance Committee Review Public Works 14 - 18 Project Clearance Committee/Subcommittee Review Electric Utility 7 - 6 Project Clearance Committee/Subcommittee Review Water and Sewer Utilities 16 - 11 Public Entertainment Police 13 - 7
Public Fireworks Display and Pyrotechnic Special Effects Use Fire 9 - 17 Pyrophoric Materials Fire 9 - 39
Pyrotechnics Special Effects Proximal to Audience Fire 9 - 17 R-1/R-2 Occupancies Fire 9 - 41
Racquet Court Reservations Parks and Recreation 12 - 6
Re-Inspection Fire 9 - 44
Record Drawings Archiving Public Works 14 - 7
Recreation Cancellation Parks and Recreation 12 - 6
Recreation Center Auditorium / Senior Center Parks and Recreation 12 - 1 Recreation Classes Parks and Recreation 12 - 10
Recreation Course/Class Cancellation, Withdrawal Admin Fee Parks and Recreation 12 - 10 Recreation Tax (Bedroom) Public Works 14 - 13
Recycled Hydrant Meter and Deposit Water and Sewer Utilities 16 - 7 Refrigeration System Fire 9 - 17
17 - 9
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Release of Stored Vehicles Police 13 - 8
Remove and Dispose of Marker, Marker Frame, Plaque, Vase and Ring Parks and Recreation 11 - 6 Replacement Fee for Lost Link+ Materials Borrowed from Other Libraries Library 10 - 1 Replacement Fee for Lost or Damaged Library Card Library 10 - 1 Replacement Fee for Portable Electronic Devices Library 10 - 1 Replacement for Library Materials Library 10 - 1
Replacement Permit Community Development 4 - 17
Repo Fee (Repossessed Vehicles) Police 13 - 9
Reposting of Public Notification Community Development 6 - 5 Residential Development Park Dedication In-Lieu Fees Parks and Recreation 12 - 11 Residential Fire-Building Plan Review (R-3/R3.1 Occupancies Only) Fire 9 - 26 Residential Loan Refinance/Subordinations All Programs Community Development 5 - 1 Residential Parking Permit Police 13 - 9
Residential Reroof Community Development 4 - 20
Residential Scaled Permit Community Development 4 - 20
Resource Fees Fire 9 - 4
Resubmittal Fee Fire 9 - 24
Review and Stamp Transfer of Lost Plan Set Community Development 4 - 18 Review of Agreements and Easements Public Works 14 - 8
Review of Permit to Enter Agreement onto City Property Public Works 14 - 9 Review of Right of Entry Agreement onto City Property Public Works 14 - 9 Rezoning Community Development 6 - 1
Sanitary Sewer Capacity Model Run Public Works 14 - 11
Sanitary Sewer Conveyance Fee Public Works 14 - 11
Sanitary Sewer Outlet Charge Public Works 14 - 10
Sanitize Crypt Parks and Recreation 11 - 7
Saturday Service Parks and Recreation 11 - 8
SB 330 Review Community Development 6 - 10
School Fire 9 - 42
Second Response Ordinance Police 13 - 9
Secondary Fireworks/Pyro Submittal - No Detailed Plan Review Required Fire 9 - 17 Secondary Pyro Submittal - No Detailed Plan Review Required Fire 9 - 17 Security Deposit for Survey Public Works 14 - 2
Senior Center Rooms Parks and Recreation 12 - 4
17 - 10
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Service Disconnection Electric Utility 7 - 5
Service Fee Customer - Owned Equipment Problem Electric Utility 7 - 5 Service Reconnection Electric Utility 7 - 5
Service Removal Electric Utility 7 - 6
Service Turn-On Finance 8 - 3
Service Wire Relocation Electric Utility 7 - 4
Sewer Lateral Cleanout Water and Sewer Utilities 16 - 13 Sewer Lateral Installation Water and Sewer Utilities 16 - 13 Sewer Lateral Video Inspection Water and Sewer Utilities 16 - 14 Shared Mobility Permit and Impound Public Works 14 - 20 Short Term Rental Permit Community Development 6 - 13
Short Term Wastewater Discharge Permit Water and Sewer Utilities 16 - 15 Significant Property Alteration Community Development 6 - 13 Signs Community Development 6 - 9
Single or Double Upright Monument Foundation Parks and Recreation 11 - 6 Single Story Buildings Fire 9 - 34
Smoke Control System Fire 9 - 18
Solar Domestic Hot Water System Installation Water and Sewer Utilities 16 - 16 Solar Domestic Hot Water System Panel Removal and Replacement Water and Sewer Utilities 16 - 16 Solar Photovoltaic System Fire 9 - 21
Solar Pool Heating System Installation Water and Sewer Utilities 16 - 16 Solar Pool Heating System Panel Removal and Replacement Water and Sewer Utilities 16 - 17 Solicitor/Peddler Police 13 - 9
Solid Waste Management Public Works 15 - 7
Special Event Application Parks and Recreation 12 - 8
Special Event Parking at Parks and Recreation Facilities Parks and Recreation 12 - 9 Special Event Food or Merchandise Vendor Parks and Recreation 12 - 10 Special Event Structure Fire 9 - 20
Specific Plan Community Development 6 - 14
Standpipe Systems Fire 9 - 18
State of California Annual Surcharges Fire 9 - 50
Storage or Refuse Bins on City Street Public Works 14 - 16 Storage Tanks - Hazardous Materials Fire 9 - 18
Storm Drain Medallion Fee Public Works 15 - 3
17 - 11
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Storm Drain Outlet Charge Public Works 14 - 9
Stormwater Management Plan Review Community Development 6 - 11 Stormwater Management Building and Planning Public Works 15 - 2 Street Tree Planting Public Works 15 - 6
Street Tree Removal Public Works 15 - 6
Subdivision Committee Review Public Works 14 - 17
Subpoena Fees Citywide 1 - 1
SVP System Impact Study Electric Utility 7 - 8
SVP Generation Interconnection Study Electric Utility 7 - 8 Tasman East Specific Plan Area Impact Public Works 14 - 15 Taxicab/Pedicab Company Police 13 - 10
Taxicab/Pedicab Driver Police 13 - 10
Technology Fee Citywide 1 - 1
Technology Fee (Building Fees) Community Development 4 - 2 Temporary Certificate of Occupancy Community Development 4 - 16 Temporary Connection to Pole Electric Utility 7 - 3
Temporary Power Electric Utility 7 - 3
Temporary Sanitary Sewer Discharge Public Works 14 - 16 Time Extensions Community Development 6 - 12
Time of Use Meter Installation Electric Utility 7 - 7
Tournament Parks and Recreation 12 - 9
Tow Drivers Police 13 - 11
Toxic Materials Fire 9 - 39
Traffic Flow Map Public Works 14 - 16
Traffic Impact Public Works 14 - 14
Traffic Sign Fabrication Public Works 15 - 5
Training Fire 9 - 1
Transportation Demand Management Fee Community Development 6 - 13 Tree Removal Permit Community Development 6 - 11
Underground - Existing Electric Utility 7 - 2
Underground - New Electric Utility 7 - 1
Underground and Above Ground Tank Installations Fire 9 - 18 Underground and Above Ground Tank Modifications Fire 9 - 19 Underground and Above Ground Tank Removals Fire 9 - 19
17 - 12
Fee Section Page No.

C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Underground Fire Service Systems Fire 9 - 20
Underground Hazardous Materials Tank Fire 9 - 52
Underground Street Light Relocation Electric Utility 7 - 3 Unstable (Reactive) Materials Fire 9 - 40
USB Drive for Police Reports Police 13 - 11
Use Permits Community Development 6 - 3
Using Library Meeting Room Library 10 - 2
Utility Billing Splitting or Combining Accounts Finance 8 - 3 Utility Engineering Plan Review & Inspection Water and Sewer Utilities 16 - 7 Utility Service Deposit Finance 8 - 2
Variance Community Development 6 - 2
Vault Disposal Parks and Recreation 11 - 6
Verification of Electric Meter Address Finance 8 - 3
Wastewater Treatment Plant Capacity Water and Sewer Utilities 16 - 15 Water and Fire Service Tap Water and Sewer Utilities 16 - 10 Water Efficiency Review Water and Sewer Utilities 16 - 8 Water Meter and Backflow Preventer Water and Sewer Utilities 16 - 3 Water Meter (Device Cost) Water and Sewer Utilities 16 - 3 Water Meter Test Water and Sewer Utilities 16 - 7
Water Reactive Materials Fire 9 - 40
Water Reconnection Water and Sewer Utilities 16 - 9
Water Service Water and Sewer Utilities 16 - 1
Water Service Abandonment Water and Sewer Utilities 16 - 9 Water Service Dual Meter Service Water and Sewer Utilities 16 - 2 Water Service Relocation Water and Sewer Utilities 16 - 10 Water Service Upgrade Excluding Device Cost Water and Sewer Utilities 16 - 12 Water Supply Assessment Preparation Water and Sewer Utilities 16 - 9 Watershed Map Public Works 14 - 7
Youth Activity Center Room Rental Parks and Recreation 12 - 5 Youth Activity Center Gymnasium Rental Parks and Recreation 12 - 5 Youth & Teen Center Room Rental Parks and Recreation 12 - 7 Zoning Clearance Community Development 6 - 1
Zoning Code Text Amendment Community Development 6 - 1
Zoning Verification Community Development 6 - 10
17 - 13

Resolution/Municipal Fee Schedule Page 1 of 3

RESOLUTION NO. 25-9437

A RESOLUTION OF THE CITY OF SANTA CLARA,
CALIFORNIA, ADOPTING THE “CITY OF SANTA CLARA
2025/26 MUNICIPAL FEE SCHEDULE”

WHEREAS, for the previous fiscal year 2024/25 (July 1, 2024 to June 30, 2025) the Santa Clara City Council (“City Council”) adopted certain fees by Resolution No. 24-9316 (“2024/25 Fee Schedule”);
WHEREAS, the City of Santa Clara (“City”) now desires to amend existing fees, eliminate certain fees, and impose new fees as set forth in the “PROPOSED CITY OF SANTA CLARA 2025/26 MUNICIPAL FEE SCHEDULE” (“Fee Schedule”) attached to the staff report accompanying this Resolution and incorporated herein by reference; WHEREAS, unchanged fees will continue to be charged at the rate set forth in the FY 24/25 Fee Schedule adopted under Resolution 24-9316;
WHEREAS, in compliance with Article XIIIC of the California Constitution and as also detailed in the Fee Schedule, the fees, rates, rental fees, fines, and charges (hereinafter, “Fee” or “Fees”) in the Fee Schedule are not taxes and are
(a) fees imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the City;
(b) fees imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the City;
(c) fees imposed for the reasonable regulatory costs to the City for issuing licenses and permits, performing investigations, inspections, and audits; (d) fees imposed for entrance to or use of local government property, or the purchase, rental, or lease of local government property;
//
Resolution/Municipal Fee Schedule Page 2 of 3

(e) fines, penalties, or other monetary charges imposed by the City as a result of a violation of law;
(f) charges imposed as a condition of property development; and/or (g) assessments and property-related fees imposed in accordance with the provisions of Article XIIID of the California Constitution;
WHEREAS, in adopting the Fee Schedule, the City exercises its powers under (a) Article XI, Section 7 of the California Constitution, (b) Article XIIIC of the California Constitution, (c) Section 50076 of the California Government Code, (d) the Charter of the City of Santa Clara, (e) the Code of the City of Santa Clara, California, and (f) any other applicable laws; WHEREAS, the City made available the proposed Municipal Fee Schedule for public review and comment ten (10) days prior to the public hearing for the proposed Fees; WHEREAS, on April 9 and April 16, 2025, the City timely published notice of the public hearing in the Santa Clara Weekly in the manner set forth in Government Code Sections 6062a and 66018;
WHEREAS, the City mailed notice of the public hearing to all persons requesting such notice pursuant to Government Code Section 66016;
WHEREAS, on April 29, 2025, the City Council held a public hearing on the Fees set forth in the Fee Schedule; and
WHEREAS, also on April 29, 2025, the City Council discussed and determined, by Resolution 25-9436, the amounts to be charged as field and turf user fees (agenda item 25-377), which shall also be included in the FY 25/26 Municipal Fee Schedule.

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. The findings as set forth herein above are hereby adopted by the City Council of Santa Clara.
//
//

2. Adoption of Fees, Rates and Charges. The Fees contained in the "CITY OF SANTA CLARA 2025/26 MUNICIPAL FEE SCHEDULE" are hereby adopted. The field and turf user fees adopted under Resolution 25-9436 shall be included in the "CITY OF SANTA CLARA 2025/26 MUNICIPAL FEE SCHEDULE."

3. Effect of Fees Prior to effective Date of Resolution. This Resolution shall not be construed so as to affect any fee or charge payable or paid under any applicable fee schedule operative prior to the effective date of this Resolution, except to the extent that the Fee Schedule supersedes the 2024/25 Fee Schedule for new fees, amended fees, and deleted fees.

4. Effective date. The Fees set forth in the "CITY OF SANTA CLARA 2025/26 MUNICIPAL FEE SCHEDULE" described in Section 2 above shall be effective on July 1, 2025.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 2grH DAY OF APRIL, 2025, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

Attachments incorporated by reference:

1. City of Santa Clara 2025/26 Municipal Fee Schedule

2. Resolution 25-9436
Resolution/Municipal Fee Schedule
Chahal, Cox, Gonzalez, Hardy, Jain, and Park, and
Mayor Gillmor
None
None
None
ATTES~

NORAPIMENTEL,MM

ASSISTANT CITY CLERK

CITY OF SANTA CLARA

Page 3 of 3 ends
← All documents from this meeting