Resolution/ 2303 Gianera Street Residential Project – Rezone Page 1 of 5 Rev: 1/9/2024
RESOLUTION NO. 25-9474
A RESOLUTION OF THE CITY OF SANTA CLARA,
CALIFORNIA, APPROVING A REZONING FROM LOW
DENSITY RESIDENTIAL - R2, TO PLANNED DEVELOPMENT
(PD) TO ALLOW A RESIDENTIAL DEVELOPMENT
CONSISTING OF EIGHT SEMI- ATTACHED SINGLE-FAMILY
RESIDENCES LOCATED AT 2303 GIANERA STREET, SANTA
CLARA
PLN23-00577 (Rezone)
PLN24-00262 (Vesting Tentative Subdivision Map)
WHEREAS, on November 29, 2023, VCI Companies (“Applicant”) filed an application (PLN23- 00577) to redevelop a 16,893 square-foot parcel, located at 2303 Gianera Street (“Project Site”) with eight residential single family units;
WHEREAS, the Owner simultaneously applied to rezone the Project Site from Low Density Residential (R2) to Planned Development (PD) and subdivide the land through a Vesting Tentative Subdivision Map application to allow the construction of eight two-story for-sale semi- attached single-family residences, associated on- and off-site improvements and a common lot to be used as a utility corridor, vehicle access, landscape open space, and bioretention areas to serve the development (“Project”), as shown on the attached Development Plans; WHEREAS, the City, as Lead Agency, in tandem with Consultant ‘David J. Powers’ prepared an Initial Study (“IS”) and a Negative Mitigation Declaration (“MND”) for the Project in accordance with the California Environmental Quality Act (“CEQA”) and the City circulated copies of the IS/MND for a 20 -day review between November 8 and December 2 , 2024, to the public agencies which have jurisdiction by law with respect to the Project, as well as to other interested persons, organizations and agencies ; and the City sought the comments of such persons, organizations and agencies;
//
//
//
Resolution/ 2303 Gianera Street Residential Project – Rezone Page 2 of 5 Rev: 1/9/2024
WHEREAS, the IS/MND identified possible impacts on the environment with Project development that with implementation of the mitigation measures specified in the Mitigation Monitoring and Reporting Program (“MMRP") for the Project would reduce the potentially significant effects to less than significant;
WHEREAS, the City through consultant ‘David J. Powers’ prepared written responses to the comments received during the Comment Period and included these responses in a Final Mitigated Negative Declaration (“MND”);
WHEREAS, the Mitigation Monitoring and Reporting Program (“MMRP”) has been prepared for implementation with Project development to reduce potentially significant impacts identified in the IS/MND for the Project, to less than significant;
WHEREAS, pursuant to Section 18.112.050 of the Classic Code of the Santa Clara, the City Council may make a determination for rezoning requests; WHEREAS, on May 14, 2025, notices of the Planning Commission Hearing and City Council Hearing were mailed to all property owners within 1000 feet of the Project Site boundaries; WHEREAS, on June 5, 2025, notice of the Planning Commission Hearing and City Council Hearing was posted at City Hall, the Central Park Library, the Mission Branch Library, the Northside Branch Library, and on the City’s website;
WHEREAS, on June 11, 2025, the Planning Commission held a duly noticed public hearing to consider the Project , at the conclusion of which, the Commission voted 7- 0 to recommend approval to the City Council to Rezone the parcel from Low Density Residential (R2) to Planned Development (PD); and
WHEREAS, on July 15, 2025, City Council held a duly noticed public hearing to consider the Project during which the City Council invited and considered any, and all verbal and written testimony and evidence offered in favor of and in opposition to the Project. //
//
Resolution/ 2303 Gianera Street Residential Project – Rezone Page 3 of 5 Rev: 1/9/2024
NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:
1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.
2. That the City Council hereby rezones the Project Site from Low Density Residential (R2) to Planned Development (PD) to allow eight semi-attached single-family residences, associated on- and off-site improvements and a common lot to be used as a utility corridor, vehicle access, landscape open space, and bioretention areas to serve the development , as shown on the attached Development Plans and conditioned as specified in the attached Conditions of Rezoning Approval, incorporated herein by this reference.
3. Pursuant to SCCC Code Section 18.112.05 0, the City Council determines that the following findings exist in support of the rezoning:
A. The existing zoning is inappropriate or inequitable, in that the existing zoning for the Project Site does not allow for residential development to meet the General Plan designated density. The Planned Development (PD) zoning would allow residential development to implement the General Plan’s Housing Element more fully than the existing Low Density Residential (R2) zoning designation for the Project Site.
B. The proposed zone change will conserve property values, protect or improve the existing character and stability of the area in question, and will promote the orderly and beneficial development of such area in that the proposal redevelops an underutilized property and visually improves the Project Site and surrounding neighborhood with physical and financial investment in the construction of a modern, high quality, residential home ownership development with on- site parking, site improvements, landscaping, and streetscape enhancements.
//
//
//
Resolution/ 2303 Gianera Street Residential Project – Rezone Page 4 of 5 Rev: 1/9/2024
C. The proposed zone change is required by public necessity, public convenience, or the general welfare of the City in that the proposed zone change provides residential development consistent with the General Plan designation for the Project Site and for-sale high- quality homeownership opportunities for eight households, of which one of the residences shall be available at an affordable income level.
D. The proposed zone change would allow imaginative planning and design concepts to be utilized that would otherwise be restricted in other zoning districts in that the proposed zone change would allow flexibility in the development standards to construct for-sale semi-attached residences that are compatible with existing and planned development in the surrounding residential and commercial area.
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
//
4. That based on the findings set forth in this resolution and the evidence in the City Staff Report, MND and MMRP, the City Council hereby rezones the Project Site to allow development of eight semi-attached single-family residences, as shown on the attached Development Plans and conditioned as specified in the attached Conditions of Rezoning Approval.
5. Effective date. This resolution shall become effective immediately.
I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED
AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 15rH DAY OF JULY, 2025, BY THE FOLLOWING VOTE:
AYES: COUNCILORS:
NOES: COUNCILORS:
ABSENT: COUNCILORS:
ABSTAINED: COUNCILORS:
Attachments Incorporated by Reference:
1. Development Plans
2. Rezone Conditions of Approval
Chahal, Cox, Gonzalez, Hardy, Jain, and Park, and
Mayor Gillmor
None
None
None
ATTEST: ~
NORA PIMENTEL, MMC
ASSISTANT CITY CLERK
CITY OF SANTA CLARA
Resolution/ 2303 Gianera Street Residential Project - Rezone Rev: 1/9/2024
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
0 5' 10' 20'
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
As indicated
4/23/2025 1:13:55 PM
COVER SHEET &
PROJECT DATA 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
00 SHEET INDEX 00 COVER SHEET & PROJECT DATA
01 EXISTING SURVEY
A1 SITE PLAN & ZONING INFO
A2 SECOND FLOOR PLAN
A3 ROOF PLAN & LOT SIZES
A4 TYPE−A HOUSE FLOOR PLANS
A5 TYPE−B HOUSE FLOOR PLANS
A6 TYPE−C HOUSE FLOOR PLANS
A7 BUILDING ELEVATIONS (SOUTH & FRONT)
A8 BUILDING ELEVATIONS (NORTH & REARYARD)
A9 BUILDING SECTIONS
A10 3D VIEWS
L1.0 LANDSCAPE SITE PLAN
L1.1 LANDSCAPE REMOVAL PLAN
L2.0 LANDSCAPE PLANTING PLAN
L2.1 HYDROZONE MAP AND WELO WORKSHEET
CONSTRUCTION DATA BUILDING TYPE: V−A
NUMBER OF STORIES: 2
OCCUPANCY GROUP: R3
FIRE SPRINKLER: YES
SCOPE OF WORK DEMOLISH EXISTING SINGLE FAMILY DWELLING
CONSTRUCT 8 ATTACHED 2−STORY SINGLE FAMILY DWELLINGS (with one bmr−unit) EXISTING BUILDING AREA: TOTAL 4399.54 SF SITE DATA & ZONING A.P.N. 104−06−037
LOT SIZE 16893 SF
EX. ZONING R1−6L / PD
EXISTING BUILDING AREA: 4399.54 SF
FLOOD ZONE DESIGNATION: ZONE X (PER FLOOD INSURANCE RATE MAP) CODES: COMPLY WITH ALL APPLICABLE 2022 CODES NO. DESCRIPTION DATE
VINCINITY MAP
GIANERA STREET VIEW 2 - LOOKING TOWARD WEST
GIANERA STREET VIEW 1 - LOOKING NORTH FROM CHEENEY STREET DS
DS
DS
DS
DS DS
DS DS
TRANS-
FORMER
IWM
WM
LOT-1 LOT-2 LOT-3 LOT-4 LOT-5 LOT-6 LOT-7 LOT-8
TRASH TRUCK
-
-
2A-10
A-9
1 A-8
1 3A-10
A
C
E
F
G
H
4 13 2
B
GUEST PARKING GUEST PARKING
10' - 0"
10 FT EASEMENT ZONE
WITH LANDSCAPING
SIDEWALK SIDEWALK
10' - 0"
10 FT EASEMENT ZONE
WITH LANDSCAPING
N
----
NON PARKING
ZONE
GIANERA STREET
EXISTING HETCH HETCHY AND NORTHERN RECEIVING STATION PRIVATE ROAD
NEW TRANSFORMER
ON PAD
FLOOR PLAN
TYPE−A FLOOR PLAN
TYPE−A
FLOOR PLAN
TYPE−BFLOOR PLAN
TYPE−B
FLOOR PLAN
TYPE−B FLOOR PLAN
TYPE−B
FLOOR PLAN
TYPE−C FLOOR PLAN
TYPE−C
EXISTING
HOUSES
EXISTING
HOUSES
EXISTING
HOUSES
EXISTING CONC WALL
5’−6" HIGH EXISITNG CONC. WALL
5’−6" HIGH
NEW FENCE 6’ HIGH
WITH 3’ ACCESS
GATE, W/KNOBOX, TYP.
PLANTING AREA
ACCENT
PAVING SEE LA
EXISTING TRANSFORMER
21' - 0" 5' - 4"
LANDSCAPING NEW LANDING
TYP.
LOT −1
LOT −2
LOT −3
LOT −4 LOT −5
LOT −6
LOT −7
LOT −8
ENTRY AREA TYP. GARAGE DRIVEWAY
TYP.
SEWER CLEANOUT TYP. WATER METER TYP.
GARAGE DRIVEWAY
TYP.
ENTRY AREA TYP.
LANDSCAPING
LANDSCAPING
BIORETENTION
AREA SEE CIVIL & LA
21' - 0"
ACCENT PAVING
6" CURB, SEE CIVIL DWG.
LANDSCAPING
AREA
7' - 0" 37' - 2" 5' - 4" 7' - 0" 5' - 4"
ELEC CHARGER READY, TYP.
CONC. PAVING TYP.
CONC. DRIVEWAY
10' - 1" 27' - 11" 12' - 1" 29' - 3" 27' - 3" 6' - 9" 27' - 3" 12' - 1" 29' - 3" 27' - 3" 6' - 9" 27' - 3" 27' - 11" 10' - 1" FENCE FENCE
3' - 6"
120' - 0"
7' - 1"
7' - 1"
A/C UNIT,
TYP
9' - 6"
4' - 6"
D
FIRE DEPT
LADDER PAD, TYP.
bioretention (silva cell) bioretention (silva cell)
>5'
10' R.O.W.
140' - 6 13/16"
140' - 11 23/32"
21' - 0" 37' - 2" 120' - 0"
TRASH BINS AREA, TYP.
LOT −B LOT −C
LOT −A
TRASH BINS AREA FOR COLLECTING DAY ONLY, TYP.
5' - 0" 5' - 0"
(BMR UNIT)
gate w/knobox for
f.d. access
gate w/knobox for
f.d. access
2X-10
3X-10
1A-10
3' - 0" 3' - 0"
2' - 6"
2' - 0"
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
0 5' 10' 20'
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/8" = 1'-0"
4/23/2025 1:13:55 PM
SITE PLAN WITH
ZONING INFO 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-11/8" = 1'-0" 1SITE PLAN - GROUND FLOOR PLAN
PARCEL IN SANTA CLARA GENERAL PLAN 2015-2025
2303 GIANERA ST. 0.39 ACRE
NO. DESCRIPTION DATE
PARCEL INFO APN 104−06−037
PACEL SIZE 16893 SF (0.39 ACRE)
ORIGINAL ZONING R1−6L
CURRENT ZONING PD
GENERAL PLAN
LAND DESIGNATION LOW DENSITY RESIDENCE
ALLOWED DENSITY 19 DU / AC
PROPOSED DENSITY
19X0.39 = 7.41 ROUND UP TO 8 UNITS (WITH ONE BMR UNIT ON LOT−5) PROPOSED ZONING PD
PROPOSED BUILDING ATTACHED SFR
PROPOSED PD SCHEME PARAMETERS
# OF UNITS ON SITE 8
SETBACKS 5.4 FT (FRONT) (24’−2" BETWEEN HOUSES) 7 FT (REARYARD) HEIGHT 30 FT MIN LOT AREA 1348.75 SF
MIN LOT WIDTH 23’−3" FT
MAX LOT COVERAGE 8092 SF (47.9%)
OPEN SPACE 4187 SF (24.8%)
DRIVEWAYS 4614 SF (27.3%)
PARKING 16 IN PRIVATE GARAGES 2 OUTDOOR GUEST PARKING SPACES CONSTRUCTION TYPE V−A
SPRNGKLER SYSTEM YES
GIANERA ST. CHEENEY ST.
DS
DS
DS
DS
DS DS
DS DS
TRANS-
FORMER
IWM
WM
LOT-1 LOT-2 LOT-3 LOT-4 LOT-5 LOT-6 LOT-7 LOT-8
TRASH TRUCK
-
-
2A-10
A-9
1 A-8
1 3A-10
A
C
E
F
G
H
4 13 2
B
----
D
2X-10
3X-10
1A-10
GUEST PARKING GUEST PARKING
10' - 0"
10 FT EASEMENT ZONE
WITH LANDSCAPING
SIDEWALK SIDEWALK
10' - 0"
10 FT EASEMENT ZONE
WITH LANDSCAPING
N
NON PARKING
ZONE
GIANERA STREET
EXISTING HETCH HETCHY AND NORTHERN RECEIVING STATION PRIVATE ROAD
NEW TRANSFORMER
ON PAD
FLOOR PLAN
TYPE−A FLOOR PLAN
TYPE−A
FLOOR PLAN
TYPE−BFLOOR PLAN
TYPE−B
FLOOR PLAN
TYPE−B FLOOR PLAN
TYPE−B
FLOOR PLAN
TYPE−C FLOOR PLAN
TYPE−C
EXISTING
HOUSES
EXISTING
HOUSES
EXISTING
HOUSES
EXISTING CONC WALL
5’−6" HIGH EXISITNG CONC. WALL
5’−6" HIGH
NEW FENCE 6’ HIGH
WITH 3’ ACCESS
GATE, W/KNOBOX, TYP.
PLANTING AREA
ACCENT
PAVING SEE LA
EXISTING TRANSFORMER
21' - 0" 5' - 4"
LANDSCAPING NEW LANDING
TYP.
LOT −1
LOT −2
LOT −3
LOT −4 LOT −5
LOT −6
LOT −7
LOT −8
ENTRY AREA TYP. GARAGE DRIVEWAY
TYP.
SEWER CLEANOUT TYP. WATER METER TYP.
GARAGE DRIVEWAY
TYP.
ENTRY AREA TYP.
LANDSCAPING
LANDSCAPING
BIORETENTION
AREA SEE CIVIL & LA
21' - 0"
ACCENT PAVING
6" CURB, SEE CIVIL DWG.
LANDSCAPING
AREA
7' - 0" 37' - 2" 5' - 4" 7' - 0" 5' - 4"
ELEC CHARGER READY, TYP.
CONC. PAVING TYP.
CONC. DRIVEWAY
10' - 1" 27' - 11" 12' - 1" 29' - 3" 27' - 3" 6' - 9" 27' - 3" 12' - 1" 29' - 3" 27' - 3" 6' - 9" 27' - 3" 27' - 11" 10' - 1" FENCE FENCE
3' - 6"
120' - 0"
7' - 1"
7' - 1"
A/C UNIT,
TYP
9' - 6"
4' - 6"
FIRE DEPT
LADDER PAD, TYP.
bioretention (silva cell) bioretention (silva cell)
>5'
10' R.O.W.
140' - 6 13/16"
140' - 11 23/32"
21' - 0" 37' - 2" 120' - 0"
TRASH BINS AREA, TYP.
LOT −B LOT −C
LOT −A
TRASH BINS AREA FOR COLLECTING DAY ONLY, TYP.
5' - 0" 5' - 0"
(BMR UNIT)
gate w/knobox for
f.d. access
gate w/knobox for
f.d. access
3' - 0" 3' - 0"
2' - 6"
2' - 0"
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
0 5' 10' 20'
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/8" = 1'-0"
4/23/2025 1:13:56 PM
TRASH DIAGRAM 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-2
NO. DESCRIPTION DATE
1/8" = 1'-0" 1TRASH DIAGRAM
DS
DS
DS
DS
DS DS
DS DS
-
-
2A-10
A-9
1 A-8
1 3A-10
A
C
E
F
G
H
4 13 2
B
----
D
120' - 0"
140' - 11 23/32"
140' - 6 13/16"
49' - 6" 21' - 0" 49' - 6"
7' - 0"
28' - 6"
10' - 1" 14'-1" +/-
14'-6" +/-
120' - 0"
N
FIRE DEPT LADDER PAD, TYP
2X-10
3X-10
1A-10
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
0 5' 10' 20'
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/8" = 1'-0"
4/23/2025 1:13:56 PM
SECOND FLOOR
PLAN 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-3
NO. DESCRIPTION DATE
1/8" = 1'-0" 1SECOND FLOOR PLAN
LOT-4
LOT-3
LOT-2
LOT-1 LOT-8
LOT-7
LOT-6
LOT-5
LOT - A
LOT - C LOT - B
(BMR UNIT)
DS
DS
DS
DS
DS DS
DS DS
-
-
--
2A-10
A-9
1 -- A-92
38' - 0"
49' - 6" 49' - 6" 120' - 0" 21' - 0"
A-8
1 3A-10
A
C
E
F
G
H
4 13 2
B
49' - 6" 21' - 0" 49' - 6"
N
----
D
27' - 3" 6' - 9" 27' - 3" 29' - 3"
140' - 6 13/16"
140' - 11 23/32"
2X-10
1X-10
3X-10
4X-10 1A-10
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
0 5' 10' 20'
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/8" = 1'-0"
4/23/2025 1:13:56 PM
ROOF PLAN &
LOT SIZES 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-41/8" = 1'-0" 1SITE PLAN - ROOF PLAN
SUBDIVISION LOT SIZES & BUILDING DATA
LOT #1 0.043 ACRE
LOT SIZE: 1876 SF
FIRST FLOOR: 1033 SF
SECOND FLOOR: 965.6 SF
ATTIC SPACE: 596.3 SF
GARAGE: 474 SF
GROSS TOTAL: 2594.9 SF
LIVABLE AREA: 2120.9 SF
LOT COVERAGE: 55%
LOT #2 0.032 ACRE
LOT SIZE: 1348.75 SF
FIRST FLOOR: 1012.8 SF
SECOND FLOOR: 986.8 SF
ATTIC SPACE: 569 SF
GARAGE: 474 SF
GROSS TOTAL: 2568.6 SF
LIVABLE AREA: 2094.6 SF
LOT COVERAGE: 75%
LOT #3 0.032 ACRE
LOT SIZE: 1348.75 SF
FIRST FLOOR: 1012.8 SF
SECOND FLOOR: 986.8 SF
ATTIC SPACE: 567 SF
GARAGE: 474 SF
GROSS TOTAL: 2557.6 SF
LIVABLE AREA: 2092.6 SF
LOT COVERAGE: 75%
LOT #4 0.032 ACRE
LOT SIZE: 1409 SF
FIRST FLOOR: 987.4 SF
SECOND FLOOR: 975.7 SF
ATTIC SPACE: 569 SF
GARAGE: 474 SF
GROSS TOTAL: 2532.1 SF
LIVABLE AREA: 2058.1 SF
LOT COVERAGE: 70.0%
LOT #5 0.032 ACRE
LOT SIZE: 1409 SF
FIRST FLOOR: 987.4 SF
SECOND FLOOR: 975.7 SF
ATTIC SPACE: 569 SF
GARAGE: 474 SF
GROSS TOTAL: 2532.1 SF
LIVABLE AREA: 2058.1 SF
LOT COVERAGE: 70.0%
LOT #6 0.032 ACRE
LOT SIZE: 1348.75 SF
FIRST FLOOR: 1012.8 SF
SECOND FLOOR: 986.8 SF
ATTIC SPACE: 567 SF
GARAGE: 474 SF
GROSS TOTAL: 2566.6 SF
LIVABLE AREA: 2092.6 SF
LOT COVERAGE: 75%
LOT #7 0.032 ACRE
LOT SIZE: 1348.75 SF
FIRST FLOOR: 10128 SF
SECOND FLOOR: 986.8 SF
ATTIC SPACE: 569 SF
GARAGE: 474 SF
GROSS TOTAL: 2568.6 SF
LIVABLE AREA: 2094.6 SF
LOT COVERAGE: 75%
LOT #8 0.043 ACRE
LOT SIZE: 1876 SF
FIRST FLOOR: 1033 SF
SECOND FLOOR: 965.6 SF
ATTIC SPACE: 600.3 SF
GARAGE: 474 SF
GROSS TOTAL: 2598.9 SF
LIVABLE AREA: 2124.9 SF
LOT COVERAGE: 55%
COMMON AREA 4928 SF 0.1131 ACRE LOT − A 4260 SF
LOT − B 334 SF
LOT − C 334 SF
ENTIRE PARCEL: 16893 SF OR 0.39 ACRE
LOT COVERAGE: 47.9% (OVERALL)
FAR: 1.17 (OVERALL)
LOT-4
LOT-3
LOT-2
LOT-1 LOT-8
LOT-7
LOT-6
LOT-5
1876 SF
1348.75 SF
1348.75 SF
1409 SF 1409 SF
1348.75 SF
1348.75 SF
1876 SF
GUEST PARKING GUEST PARKING
LOT - A4260 SF
NO. DESCRIPTION DATE
LOT - C LOT - B
(BMR UNIT)
DS DS DS DS
DS DS
12' - 0"
37' - 2"
12' - 0"
LIVING ROOM
GARAGE
POWDER ROOM KITCHEN
ENTRY/ HALLWAY STAIR
F
G
12 36' - 0"
LANDSCAPE AREA
DRIVEWAY
ELEC CHARGER
READY
LANDING
LANDING
POST,TYP.
SEWER
CLEANOUT
WATER METER
2' - 0" 27' - 3"
3' - 0"
UP
3' - 2"
5'-6" ,
27' - 3"
12' - 0"
13' - 8"
4' - 0"
BEDROOM1
BEDROOM-2
BATHROOM-2
BATHROOM-1
HALLWAY STAIR LAUNDRY ROOM
BEDROOM3
F
G
12 3' - 6"
3' - 2"
2' - 1 15/32"
29' - 3"
13' - 9"
2' - 9" 7' - 7"
27' - 3" 3' - 7" 6' - 3"
8' - 0"
9' - 3"
13' - 2"
12' - 0"
7' - 8"
F
G
12 DOWN
6' - 6" 12' - 0" 6' - 6" 4' - 1" 7' - 4"
14' - 0" 6' - 8" 5' - 5" 3'-2" @PL
35' - 2"
7' - 0"
7' - 4 3/32"
29' - 3" 27' - 3"
EQ. EQ.
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
0 2' 4' 8'
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/4" = 1'-0"
4/23/2025 1:13:56 PM
TYPE-A HOUSE
FLOOR PLANS 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-5
1/4" = 1'-0" 1TYPE-A HOUSE 1ST FLOOR PLAN
1/4" = 1'-0" 2TYPE-A HOUSE 2ND FLOOR PLAN
1/4" = 1'-0" 3TYPE-A HOUSE ATTIC FLOOR PLAN
NO. DESCRIPTION DATE
DS
DS DS DS
DS DS C
12 D
DINING KITCHEN ENTRY HALLWAY
LIVING ROOM
GARAGE
BATH ROOM
CLOSET
TRASH BIN CLOSET
12' - 0"
36' - 0"
5' - 4"
27' - 3"
7' - 0" EXISTING WALL
NEW FENCE A/C
37' - 2"
12' - 6" 23' - 6"
13' - 7" FIRE DEPT
LADDER PAD
EV CHARGER READY
LANDSCAPING
C
12 D
BEDROOM1
BEDROOM2 BEDROOM3
HALLWAY & STAIRS
BATHROOM1
BATHROOM2
DOWN UP
7' - 0"
27' - 3"
2' - 9"
3' - 7"
7' - 7" 16' - 11"
4' - 1"
6' - 3"
4' - 1"
27' - 3"
8' - 0"
12' - 0"
9' - 2"
13' - 2"
12' - 0"
C
12 D
7' - 4" 35' - 2" 7' - 0"
DOWN
6' - 6" 12' - 0" 6' - 6" 4' - 1" 7' - 4"
1' - 2" 8' - 11" +/-
27' - 3"
13' - 7 1/2" 13' - 7 1/2"
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
0 2' 4' 8'
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/4" = 1'-0"
4/23/2025 1:13:57 PM
TYPE-B HOUSE
FLOOR PLANS 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-6
NO. DESCRIPTION DATE
1/4" = 1'-0" 1TYPE-B HOUSE 1ST FLOOR PLAN
1/4" = 1'-0" 2TYPE-B HOUSE 2ND FLOOR PLAN
1/4" = 1'-0" 3TYPE-B HOUSE ATTIC FLOOR PLAN
DS
DS DS DS
DS DS C
12 B
27' - 11"
0' - 1"
UP
GARAGE
STAIR
7' - 0"
LIVING ROOM
DINING KITCHEN
EXISTING CONC WALL
5’−6" HIGH
NEW WOOD FENCE
6’−0" HIGH
BIORETENTION
ELEC CHARGER
READY
DRIVEWAY
REAR YARD
LANDSCAPE
AREA
5' - 4" 3' - 5"
31' - 6 1/2" 5' - 7 1/2"
C
12 B
DOWN UP
HALLWAY
BATH 2
BATH 1
LAUNDRY
BEDROOM3 BEDROOM2
BEDROOM1
49' - 6"
27' - 11"
2'-1" .
2' - 9" 7' - 7"
12' - 0" 12' - 4" +/-
3' - 6"
10' - 6"
12' - 5"
4' - 1"
13' - 2"
3' - 6"
10'-0" +/-
C
12 B
ATTIC SPACE
DOWN
FURNANCE
IN LOW−ATTIC
SPACE
27' - 11"
7' - 0"
7' - 4"
14' - 0"
5' - 6" 6' - 6" 12' - 4 1/2"
10' - 2 1/2"
6' - 1"
4' - 9"
49' - 6"
2' - 0"
49' - 6"
4' - 11"
5' - 5 1/8"
13' - 4 3/4"
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
0 2' 4' 8'
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/4" = 1'-0"
4/23/2025 1:13:57 PM
TYPE-C HOUSE
FLOOR PLANS 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-7
1/4" = 1'-0" 1TYPE-C HOUSE 1ST FLOOR PLAN
1/4" = 1'-0" 2TYPE-C HOUSE 2ND FLOOR PLAN
1/4" = 1'-0" 3TYPE-C HOUSE ATTIC FLOOR PLAN
NO. DESCRIPTION DATE
1ST FLOOR 0' -0"
2ND FLOOR 10' -0"
ATTIC FLOOR 19' -0"
AVG. GRADE -0' -6"
PL 22' -0"
T.O. RIDGE 29' -6"
3A-10
4 13 2
24' - 2"
30' - 8"
28' - 0"
30' - 0"
21' - 0" 49' - 6" 49' - 6"
STONE VENEER
HARDIE BD SIDING
ASPHALT SHINGLE ROOF
33' - 8" 37' - 2" 37' - 2" 1X-10
1ST FLOOR 0' -0"
2ND FLOOR 10' -0"
ATTIC FLOOR 19' -0"
2A-10
AVG. GRADE -0' -6"
PL 22' -0"
T.O. RIDGE 29' -6"
A C E F G HB
---- 7' - 11"
2' - 9"
6' - 9"
STONE VENEER
HARDIE BD SIDING ASPHALT SHINGLE ROOF
ENTRY DOOR GARAGE DOOR
10' - 1" 27' - 11"
2' - 0"
D
27' - 3" 6' - 9" 27' - 3" 29' - 3" 12'-1" +/-
5' SIDEWALK EASEMENT
140' - 6 13/16"
& 5' LANDSCAPE
8' - 6"
2X-10 3X-10
4X-10
1A-10
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/8" = 1'-0"
4/23/2025 1:14:01 PM
SOUTH
ELEVATION &
PRIVATE ROAD
ELEVATION 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-8
1/8" = 1'-0" 1GIANERA ST ELEVATION
1/8" = 1'-0" 2PRIVATE ROAD FRONT ELEVATION
NO. DESCRIPTION DATE
1ST FLOOR 0' -0"
2ND FLOOR 10' -0"
ATTIC FLOOR 19' -0"
2A-10
AVG. GRADE -0' -6"
PL 22' -0"
T.O. RIDGE 29' -6"
A C E F G HB
---- HARDIE BD SIDING ASPHALT SHINGLE
ROOF
D
2X-10 3X-10 4X-10 1A-10
1ST FLOOR 0' -0"
2ND FLOOR 10' -0"
ATTIC FLOOR 19' -0"
AVG. GRADE -0' -6"
PL 22' -0"
T.O. RIDGE 29' -6"
3A-10 41 32
33' - 8"
31' - 8"
30' - 0"
21' - 0" 49' - 6" 49' - 6"
STONE VENEER
HARDIE BD SIDING
ASPHALT SHINGLE ROOF
7' - 0" 5' - 4"
1X-10
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/8" = 1'-0"
4/23/2025 1:14:07 PM
NORTH
ELEVATION &
REAR YARD
ELEVATION 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-9
1/8" = 1'-0" 2REAR YARD ELEVATION
1/8" = 1'-0" 1NORTH ELEVATION
NO. DESCRIPTION DATE
1ST FLOOR 0' -0"
2ND FLOOR 10' -0"
ATTIC FLOOR 19' -0"
AVG. GRADE -0' -6"
PL 22' -0"
3' - 0" 9' - 0" 10' - 0" 0' - 6"
T.O. RIDGE 29' -6"
4 3
7' - 0" 7' - 4"
5' - 4" 2' - 0"
49' - 6"
6' - 4"
3' - 6" 1ST FLOOR 0' -0"
2ND FLOOR 10' -0"
ATTIC FLOOR 19' -0"
AVG. GRADE -0' -6"
PL 22' -0"
T.O. RIDGE 29' -6"
C B
D
1ST FLOOR 0' -0"
2ND FLOOR 10' -0"
ATTIC FLOOR 19' -0"
AVG. GRADE -0' -6"
PL 22' -0"
T.O. RIDGE 29' -6"
4 13 2
70°
6'-10" MIN CLR
9' - 0"
74°
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
1/4" = 1'-0"
4/23/2025 1:14:08 PM
BUILDING
SECTIONS 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-10
1/4" = 1'-0" 2TYPE-B HOUSE CROSS SECTION 1/4" = 1'-0" 3LONGITUDINAL SECTION NO. DESCRIPTION DATE
LIVING / DINING / KITCHEN
BEDROOM BATH STAIR
ATTIC SPACE ATTIC ATTIC
BEDROOM BATH
GARAGE GARAGE
1/4" = 1'-0" 1LONGITUDINAL CROSS SECTION
BEDROOM BEDROOM
ATTIC ATTIC
GARAGE
BEDROOM
LIVING / DINING / KITCHEN
BATHROOM
LIVING / DINING / KITCHEN
STAIR
STAIR
798 North First Street SAN JOSE, CA 95112 Email: [email protected] www.vcicompanies.com | architecture | structure | | planning | interior |
ARCHITECTURE VIC. . .
Issued Date: Job No.:
Scale:
1A A
B
C
D
E
F
G
H
I
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
H
I
Sheet Number:
Revisions:
© All drawings and written material appearing herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect.
Sheet Title.:
4/23/2025 1:14:14 PM
3D VIEWS 2303 GIANERA ST
TENTATIVE SUBDIVISION
1/25/2024 220008 2303 GIANERA STREET
SANTA CLARA, CA 95050
A-11
3GIANERA STREET VIEW
2SOUTHEAST CORNER 4NORTHEAST CORNER
1OVERALL VIEW FROM ABOVE
NO. DESCRIPTION DATE
Meeting Date: July 15, 2025 Page 1
Conditions of Adoption of a Rezoning
Conditions of Approval PLN23-00577 / 2303 Gianera Street
Rezone, (PLN23-00577) to Allow the Development of eight Attached Single-Family Residences and Associated On- and Off-Site Improvements
GENERAL
G1. Permit Expiration. This Permit shall automatically be revoked and terminated if not used within two years of original grant or within the period of any authorized extensions thereof.
The date of granting of this Permit is the date this Permit is approved by the City Council.
The expiration date is July 15, 2027.
G2. Conformance with Plans. Prior to the issuance of Building Permit, the development of the site and all associate improvements shall conform to the approved plans on file with the Community Development Department, Planning Division. No change to the plans will be made without prior review by the Planning Division through approval of a Minor Amendment or through an Architectural Review, at the discretion of the Director of Community Development or designee. Each change shall be identified and justified in writing.
G3. Conditions on Plans. All conditions of approval for this Permit shall be reprinted and included within the first three sheet s of the building permit plan sets submitted for review and approval. At all times these conditions of approval shall be on all grading and construction plans kept on the project site.
G4. Code Compliance. Comply with all requirements of Building and associated codes (the California Building Code. California Electric Code, California Mechanical Code, California Plumbing Code, California Green Building Code, the California Energy Code, etc.) current at the time of application for Building Permit, that includes grading and site utility permits.
DESIGN / PERFORMANCE – PRIOR TO BUILDING PERMIT ISSUANCE P1. Tree Replacement (On-site). Trees permitted by the City for removal shall provide replacement on-site at a ratio of 2:1 with a minimum 15-gallon tree size. (SCC 12.35.090)
DURING CONSTRUCTION
P2. Construction Hours. Construction activity shall be limited to the hours of 7:00 a.m. to 6:00 p.m. weekdays and 9:00 a.m. to 6:00 p.m. Saturdays for projects within 300 feet of a residential use and shall not be allowed on recognized State and Federal holidays.
P3. Construction Trash/Debris. During construction activities, the owner or designee is responsible for collection and pick -up of all trash and debris on- site and adjacent public right-of-way.
P4. Landscape Water Conservation. The owner or designee shall ensure that l andscaping installation meets City water conservation criteria in a manner acceptable to the Director of Community Development.
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 2
P5. Construction Management Plan . The owner or designee shall submit a construction management plan addressing impacts to the public during construction activities including:
showing work hours, noticing of affected businesses, construction signage, noise control, storm water pollution prevention, job trailer location, contractor parking, parking enforcement, truck hauling routes, staging, concrete pours, crane lifts, scaffolding, materials storage, pedestrian safety, and traffic control. The plan shall be submitted to the Director of Community Development or designee for approval prior to issuance of demolition and building permits.
P6. Landscape Water Conservation. The owner or designee shall ensure that landscaping installation meets City water conservation criteria in a manner acceptable to the Director of Community Development.
OPERATIONAL CONDITIONS
P7. Use of Garage. The owner or designee shall ensure that the garage always be maintained free and clear for vehicle parking use. It shall not be used only for storage.
P8. Landscaping Installation & Maintenance. The owner or designee shall ensure that the landscaping installed and accepted with this project shall be maintained on the site as per the approved plans. Any alteration or modification to the landscaping shall not be permitted unless otherwise approved by the Director of Community Development.
P9. Landscaping. The owner or designee shall maintain the front yard landscaping between the house and sidewalk. New landscape areas of 500 square feet or more or rehabilitated landscape areas of 2,500 square feet or more shall conform to the California Department of Water Resources Water Efficient Landscape Ordinance.
MITIGATION MEASURES
P10. Mitigation Monitoring and Reporting Program. The Mitigation Monitoring and Reporting Program (MMRP), prepared for this project in compliance with the California Environmental Quality Act (CEQA), shall be incorporated by reference as conditions of approval. The applicant shall comply with all specified mitigation measures in the timelines outlined in the project’s MMRP.
COMMUNITY DEVELOPMENT - BUILDING DIVISION
DESIGN / PERFORMANCE– PRIOR TO BUILDING PERMIT ISSUANCE BD1. Addressing. Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 3
Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review.
Please note city staff policy that existing site addresses typically are retired. Provide digital pdf printed from design software, not scanned from printed paper sheet. a. Any building or structure that is demolished shall have its address retired and a new address/s shall be issued for the project.
BD2. Flood Zone. The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map: https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code.
a. FEMA Flood Zone map designations and requirements are based on the map in effect at date of Building Permit issuance.
BD3. Water Pollution Control. The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-
w2k.com/nd_wp.shtml. All projects that disturb more than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP):
http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD). All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page:
• ht
tps://www.santaclaraca.gov/our -city/departments-g-z/public- works/environmental-programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.
BD4. Submittal Requirements. The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on -site field superintendent(s). The meeting will not be held without the attendance of the on -site field superintendent(s). The on-si te grading permit shall be a separate permit application to the Building Division.
DURING CONSTRUCTION – PRIOR TO OCCUPANCY
BD5. Temporary Certificates of Occupancy. Temporary Certificates of Occupancy (TCO) will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, P.W./ Engineering, Fire Prev., Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 4
COMMUNITY DEVELOPMENT - HOUSING DIVISION
DESIGN / PERFORMANCE – PRIOR TO BUILDING PERMIT ISSUANCE
H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the affordable housing requirements for the proposed 8 units for-sale residential development.
The Applicant is utilizing State Density Bonus on this project and have elected to provide one affordable housing unit.
a. The One affordable unit shall be provided at an affordable housing cost for a household earning up to one hundred percent (100%) of area median income (AMI). Affordable Unit shall have prices set in accordance with the City’s Below Market Purchase (BMP) Program Policies and Procedures Manual (subject to updates and changes). Applicant shall be responsible for cost incurred under the California Building Standards (California Code of Regulations, Title 24) for the each affordable for - sale residential unit. Affordable units shall be reasonably dispersed throughout the project and shall on average contain the same number of bedrooms and shall be comparable to the design of the market -rate units in terms of appearance, material and finished quality of the market rate units in the project. Affordable units shall have the same access to the project amenities and recreational facilities as market-rate units.
H2. Affordable Housing Agreement. Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement (AHA) with the City that will determine the Affordable Sales Price, identify the actual unit to be sold as the Affordable Unit, and apply all terms and covenants guaranteeing the prescribed affordability, to the satisfaction of the Director of Community Development. There is a fee for the AHA preparation in the amount of $XX which will be due prior to execution of the AHA (per Municipal Fee schedule).
FIRE DEPARTMENT
DESIGN / PERFORMANCE—PRIOR TO BUILDING PERMIT ISSUANCE
F1. Emergency rescue openings will have adequate space for ladder pads. Rooms located on the side of structures on the 2nd floor in current planning application represent inadequate spacing as the side yards are not large enough to allow spacing for ladder pads. This will need to be addressed in the building permits.
F2. Hazmat Clearance. Prior to any Building Permit issuance, Hazardous Materials Closure (HMCP) is required as applicable: This is a permit is issued by the Santa Clara Fire Department, Fire Prevention & Hazardous Materials Division. Hazardous materials closure plans are required for businesses that used, handled or stored hazardous materials. While required prior to closing a business this is not always done by the business owner, and therefore should be part of the developer’s due diligence. The hazardous materials closure plans demonstrate that hazardous materials which were stored, dispensed, handled or used in the facility/business are safely transported, Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 5
disposed of or reused in a manner that eliminates any threat to public health and environment.
F1. Hazmat Clearance. Prior to any Building Permit Issuance, a Phase II environmental assessment is required to be submitted to CRRD for review. If hazards are present that require site mitigation, cleanup, or management of chemical contaminants in soil, soil vapor, or groundwater a separate permit from one of the regulatory agencies below will be required. The type and extent of contamination on site(s) will govern which of the regulatory agencies noted below can supervise the cleanup: Department of Toxic Substances Control (DTSC); State Water Resources Control Board; or Santa Clara County, Department of Environmental Health.
If the project intends to contract with a State or County Agency for onsite/offsite environmental remediation activities the following documentation shall be provided to the Fire Prevention & Hazardous Materials Division prior to issuance of a Building Per mit for demolition or grading: Oversight agency case number; and Oversight mangers contact name, phone number.
For smaller projects that are not moving soil at all, a Phase I environmental assessment may be adequate. Please contact Assistant Fire Marshal Fred Chun at [email protected]
for more information.
F2. Fire Flow Requirement. Prior to Building Permit Issuance, provide documentation from the City of Santa Clara Water & Sewer Department that the minimum required fire -flow can be met. Fire Department fire -flow will be based on the current California Fire Code.
The most restrictive departments requirement shall apply.
F3. Fire Hydrants. Prior to Building Permit Issuance, building plans shall show the required number, location and distribution of fire hydrants for the buildings will be based on the current California Fire Code, Appendix C as amended. The required number of fire hydrants will be based on the fire-flow before the reduction for fire sprinklers. Both public and private fire hydrants may be required.
F4. Emergency Responder Radio Coverage System. Prior to Building Permit Issuance, provisions shall be made for Emergency Responder Radio Coverage System (ERRCS) equipment, including but not limited to pathway survivability in accordance with Santa Clara Emergency Responder Radio Coverage System Standard.
F5. Fire Department Access. Prior to the start of construction, roadways and water supplies for fire protection are required to be installed and made serviceable and maintained throughout the course of construction.
F6. Alternative Means and Methods. Prior to any Building Permit issuance, an alternate means or methods permits to mitigate any code deficiency must be submitted and approved. Please submit this permit concurrently with the building plans. Please note specific mitigations may have been discussed during the planning process. None of these discussions are binding and can only be formally approved through submitting an AMMR permit. The AMMR permit is formally documenting that and still needs to be submitted.
F7. Hazmat Information. Prior to Building Permit Issuance, a Hazardous Materials Inventory Statement including refrigerants is required to be submitted and reviewed with the Building Permit if applicable.
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 6
F8. Fire Safety During Construction. Prior to Building Permit Issuance, a permit for Construction Safety & Demolition shall be submitted to the fire department for review and approval in compliance with our Construction Safety & Demolition standard.
DURING CONSTRUCTION – PRIOR TO OCCUPANCY
F9. Shared Fire Protection Features that Cross Property Lines. Prior to Building Permit Final, any EVAEs or fire protection equipment (including but not limited to fire service undergrounds, sprinkler piping, fire alarm equipment, fire pumps, ERRCS) that cross property lines or is not located on the parcel of the building it serves shall have a CC&R legally recorded detailing who is responsible for maintenance and repair of the EVAE or fire protection equipment.
F10. Fire Protection Systems Before Occupancy. Prior to any Certificate of Occupancy Issuance (temporary or permanent), fire- life safety systems installations must be fully installed, functional, and approved.
PUBLIC WORKS DEPARTMENT - ENGINEERING
ENGINEERING
DESIGN—PRIOR TO BUILDING PERMIT ISSUANCE
E1. Stormwater Control Measures. The owner or designee shall incorporate Best Management Practices (BMPs) into construction plans in accordance with the City’s Urban Runoff Pollution Prevention Program for construction-related water runoff measures prior to issuance of permits.
E2. Site Clearance. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees.
Other requirements may be identified for compliance during the site clearance process.
Contact Public Works Department at (408) 615-3000 for further information.
E3. Easement. Obtain Council approval of a resolution ordering vacation of existing public easement(s) proposed to be abandoned, if any, through Public Works Department, and pay all appropriate fees, prior to start of construction.
E4. Subdivision Map. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, closure calculations, and all appropriate fees.
DURING CONSTRUCTION
E5. Encroachment Permit. All work within the public right -of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department. Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.
E6. Encroachment Permit. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 7
installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.
E7. Encroachment Permit. Existing non- standard or non -ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.
E8. Encroachment Permit. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.
E9. Encroachment Permit. Owner or designee shall provide a complete storm drain study for the 10-year and 100-year storm events. The grading plans shall include the overland release for the 100 -year storm event and any localized flooding areas. System improvements, if needed, will be at developer’s expense.
E10. Encroachment Permit. Sanitary sewer and storm drain mains and laterals shall be outside the drip line of mature trees or ten (10) feet clear of the tree trunk, whichever is greater, to the satisfaction of the City Engineer.
E11. Encroachment Permit. Provide root barriers when the drip line of the mature trees covers the sidewalk. Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barriers for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.
E12. Encroachment Permit. Existing streetlights shall be clear of proposed sidewalk, developer shall relocate as necessary.
E13. Easement. Dedicate required on- site easements for any new public utilities, and/or emergency vehicle access by means of subdivision map or approved instrument at time of development.
E14. Easement. Dedicate sidewalk easements along the project frontage where public sidewalks extend into private property. Sidewalk easements are to be 1’ behind proposed back of walk where there is landscaping behind sidewalk. Sidewalk easement where hardscape is behind sidewalk is to be at back -of-walk. Cold joint is required between public sidewalk and private hardscape.
E15. Agreement. If requested, owner or designee shall prepare and submit for City approval a maintenance plan for all sidewalk, curb and gutter, landscaping and irrigation system improvements installed within the public right -of-way prior to encroachment permit issuance. Such plan shall include at a minimum, maintenance requirements for trees and shrubs, in acknowledgement of developer’s/pr operty owner’s obligation under Chapter
12.30 and 17.15.
TRAFFIC
DURING CONSTRUCTION
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 8
TR1. Traffic improvements must comply with the City of Santa Clara Standard Specifications for Public Works Construction
STREETS DIVISION
Right of Way Landscape
DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT L1. Tree Preservations Specifications. Include City of Santa Clara Tree Preservation /City Arborist specifications on all improvement plans.
L2. Mature Trees. Identify existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.
L3. Tree Replacement. 2:1 tree replacement ratio required for all trees removed from the right-of-way.
DURING CONSTRUCTION OR OPERATION
L4. No Public Root Cutting. No cutting of any part of public, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).
PRIOR TO FINAL OF BUILDING PERMIT
L5. In Lieu Fee. If 2:1 replacement ratio cannot be met for removal of right of way landscape trees, tree planting fee must be paid prior to building permit final.
Solid Waste
DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT SW1. Post-Construction Solid Waste Generation Estimation and Collection Form. The applicant shall complete and provide the Post -Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type. Contact the Public Works Department at [email protected]
or (408) 615-3080 for more information.
SW2. Site Plan. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, trash enclosures and trash staging areas. The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines. Solid metal roof, gates and a trench drain shall be installed within the trash enclosure and connected to the on-site sewer system.
SW3. Construction Waste Diversion. For projects that involve construction, demolition or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section
8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check -off list. App licant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 9
Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/.
SW4. Authorized Service Haulers. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers.
Insert the General Notes for t he Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.
SW5. Exclusive Franchise Hauling Area. Project applicant shall contact the Public Works Department, Street Maintenance Division at (408) 615- 3080 to verify if the property falls within the City’s exclusive franchise hauling area. If so, the applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.
DURING CONSTRUCTION OR OPERATION
SW6. Waste Generation Tracking. Applicant to track all waste generated and upload debris tags to GreenHalo for City staff review.
PRIOR TO FINAL OF BUILDING PERMIT
SW7. Weight Tickets. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and construction activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required.
Stormwater
DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT ST1. Final Stormwater Management Plan. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.
ST2. 3
rd Party Review of Final Stormwater Management Plan. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter (on design) shall be submitted with the Plan.
ST3. Notice of Intent. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).
ST4. Best Management Practices. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post -construction water runoff measures into project plans. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans. Applicant to add Source control measures with designations from C.3 stormwater handbook, Appendix H.
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 10
ST5. C.3 Treatment Facilities Construction Notes. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.
ST6. Decorative & Recreational Water Features. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.
ST7. Small Projects. For single- family homes and other small projects that create and/or replace 2,500 – 10,000 square feet of impervious surface area, the applicant shall implement at least one of the following site design measures:
a. Direction of roof runoff into cisterns or rain barrels b. Direction of roof, sidewalk, walkway, patio, driveway, or parking lot runoff onto vegetated areas
c. Construction of sidewalks, walkways, patios, bike lanes, driveways, and parking lots with permeable surfaces
Plans shall specify which site design measures are selected for the project and show the direction of flow from impervious surfaces to the selected site design measures. All measures shall meet the design criteria in the 2016 C.3. Stormwater Handbook, Appendix K: Standard Specifications for Lot-Scale Measures for Small Projects.
ST8. Interior Floor Drains. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.
ST9. Trash Enclosure Floor Drains. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.
ST10. Architectural Copper. The use of architectural copper is prohibited.
DURING CONSTRUCTION OR OPERATION
ST11. Biotreatment Soil Media. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on -site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).
ST12. Stormwater Control Measure Inspection. At critical construction phases, all stormwater control measures shall be inspected for conformance to approved plans by a qualified 3 rd
party consultant from the SCVURPPP List of Qualified Consultants.
ST13. Inspections. Permeable Pavement, Media Filter vaults, and Trash Full Capture Devices shall be inspected by a 3 rd party reviewer and/or manufacturer representative for conformance with the details and specifications of the approved plans. All new pervious concrete and porous asphalt pavements should have a minimum surface infiltration rate of 100 in./hr. as described in the SCVURPPP C.3 Handbook. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.
ST14. Stormwater Treatment Facilities. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).
ST15. Amendments to Operation & Maintenance Agreement. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 11
ST16. Stormwater Pollution Prevention Messaging. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.
ST17. Outdoor Storage Areas. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.
PRIOR TO FINAL OF BUILDING PERMIT
ST18. As-Built Drawings. As-Built drawing shall be submitted to the Public Works Department.
ST19. 3rd Party Concurrence Letter. 3 rd Party concurrence letter on the C.3 facilities construction shall be submitted to the Public Works Department. The letter shall be prepared by a 3rd party consultant from the SCVURPPP List of Qualified Consultants. The City reserves the right to review the 3 rd party inspection report on the C.3 stormwater facility installation.
ST20. Final C.3 Inspection. Applicant shall schedule and City shall conduct a final C.3 inspection.
ST21. Operation & Maintenance Agreement. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Dept. - Environmental Services at (408) 615- 3080 or [email protected]
for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter vaults and full trash capture devices is to be done annually by December 31 of each year.
SILICON VALLEY POWER
GENERAL
SVP1. Applicant Design Process: available to Applicants to expedite distribution electric substructure design.
SVP2. SVP Rules and Regulations: Applicant shall comply with all applicable SVP rules, regulations, standards, guidelines, and requirements, as may be amended from time to time.
SVP3. SVP Equipment Clearances:
a. Access Doors: Ten (10) foot minimum clearance in front of equipment access doors.
b. Pad Sides: Five (5) foot minimum clearance from pad on sides without access doors.
c. Truck Access: Eighteen (18) foot minimum width on one side of the equipment pad for truck access.
d. Barrier pipes: (on sides accessible to vehicles)
i. Thirty (30) inches from equipment sides.
ii. Forty-Eight (48) inches in front of access doors. (use removable bollards) SVP4. SVP Conduit Clearances:
a. Longitudinal: Five (5) foot minimum between new conduits/piping and existing/proposed SVP conduits.
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 12
b. Vertical: Twelve (12) inch minimum between new conduit/pipes perpendicular to existing SVP conduits.
c. Poles/Posts: Three (3) foot six (6) inches clearance required from poles (electrolier, guy stub, service clearance, self -supporting steel, and light poles), except for riser conduits. This is reduced to a three (3) foot minimum for posts (signposts, barrier pipes, bollards, fence posts, and other similar posts). d. Structures: Five (5) foot minimum is required from walls, footings, retaining walls, landscape planter, or similar permanent structures.
e. Subsurface Facilities: Five (5) foot minimum from new splice boxes, pull boxes, manholes, vaults, or similar subsurface facilities.
f. Fire Hydrant: Five (5) foot minimum from fire hydrant thrust block. (Extends 5 feet on either side of the hydrant in line with the radial water pipe connected to the hydrant).
SVP5. SVP Vault/Manhole Clearances:
a. Ten (10) foot minimum between adjacent Vaults or Manholes. b. Three (3) foot minimum from face of curb. (bollards required for vaults).
SVP6. SVP Guy Anchor Clearances: Five (5) foot minimum clearance is required between the center of anchor line and any excavation area.
SVP7. Tree Clearances:
a. Conduits: Five (5) foot minimum to tree root barrier or other subsurface wall or structure.
b. Equipment: Five (5) foot minimum to tree root barrier. The tree canopy drip line cannot be over the SVP equipment.
c. Subsurface Facilities: Five (5) foot minimum to any electric department facilities.
Any existing trees in conflict will have to be removed. d. Easements: No trees shall be planted in SVP’s U.G.E.E or P.U.E’s. e. Transformer & Switch Placement: these devices and pads may only be located outdoors. Clearances to buildings are defined in UG1225. All projects are to assume mineral oil fluid, unless otherwise approved by SVP.
SVP8. SVP Standards. Applicant shall comply with the following SVP standards (as may be amended or supplemented).
a. UG1000 - Installation of Underground Substructures by Developers b. UG1250 – Encroachment Permit Clearances from Electric Facilities c. UG0339 – Remote Switch Pad
d. OH1230 – Tree Clearances from Overhead Electric Lines e. SD1235 – Tree Planting Requirements Near Underground Electric Facilities f. UG1225 – Pad mounted Equipment Clearances and Protection g. UG0250 – High Density Residential Metering Requirements h. FO-1901 – Fiber Optic Splicing and Testing Methods
i. SVP Rules and Regulations – Latest Edition
SVP9. SVP Standards, Miscellaneous:
a. In the case of podium -style construction, all SVP facilities and conduit systems must be located on solid ground (aka “real dirt”) and cannot be supported on parking garage ceilings or placed on top of structures.
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 13
b. No splice boxes are allowed between the SVP utility connection point and the applicants main switch board.
c. SVP does not utilize any sub- surface (below grade) devices in its system. This includes transformers, switches, etc.
SVP10. Meter Locations:
a. For condominium or apartment, all electric meters and service disconnects shall be grouped at one location, outside of the building or in a accessible utility room.
If they are townhomes or single- family residences, then each unit shall have its own meter, located on the structure. A double hasp locking arrangement shall be provided on the main switchboard door(s). Utility room door(s) shall have a double hasp locking arrangement or a lock box shall be provided. Utility room door(s) shall not be alarmed.
b. All interior meter rooms at ground level are to have direct, outside access through only ONE door. Interior electric rooms must be enclosed in a dedicated electric room and cannot be in an open warehouse or office space.
SVP11. Underground Service Entrance
a. (277/480V Service or Lower) Underground service entrance conduits and conductors shall be “privately” owned, maintained, and installed per City Building Inspection Division Codes to the SVP defined utility connection point. b. (12KV Service) SVP terminates cable on the applicant owned switchgear. c. No cross-parcel distribution is allowed. SVP service points must be within the parcels that they serve.
SVP12. Code Sections:
a. The Applicant shall provide and install electric facilities per Santa Clara City Code chapter 17.15.210.
b. Installation of underground facilities shall be in accordance with City of Santa Clara Electric Department standard UG-1000, latest version, and Santa Clara City Code chapter 17.15.050.
c. The applicant shall perform, in accordance with current City standards and specifications, all trenching, backfill, resurfacing, landscaping, conduit, junction boxes, vaults, street light foundations, equipment pads and subsurface housings required for power distribution, street lighting, and signal communication systems, as required by the City in the development of frontage and on-site property. Upon completion of improvements satisfactory to the City, the Applicant will dedicate the improvement to the City subject to City’s acceptance the work. The applicant shall further install at his cost the service facilities, consisting of service wires, cables, conductors, and associated equipment necessary to connect a applicant to the electrical supply system of and by the City. After completion of the facilities installed by the Applicant, the City shall furnish and install all cable, switches, street lighting poles, luminaries, transformers, meters, and other equipment that it deems necessary for the betterment of the system per Santa Clara City Code chapter
17.15.210 (2).
SVP13. Existing Facilities:
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 14
a. All existing SVP facilities, onsite or offsite, are to remain unless specifically addressed by SVP personnel in a separate document. It is the Applicants responsibility to maintain all clearances from equipment and easements. The Applicant may contact SVP outside of the PCC process for clear definitions of these clearance requirements. Applicant should not assume that SVP will be removing any existing facilities without detailed design drawings from SVP indicating potential removals. Simply indicating that SVP facilities are to be removed or relocated on conceptual plans does not imply that this action has been approved by SVP.
b. Any relocation of existing electric facilities shall be at Applicants expense.
SVP14. Generators: Non-Utility Generator equipment shall not operate in parallel with the electric utility, unless approved and reviewed by the Electric Engineering Division. All switching operations shall be “Open-Transition-Mode”, unless specifically authorized by SVP Electric Engineering Division. A Generating Facility Interconnection Application must be submitted with building permit plans. Review process may take several months depending on size and type of generator. No interconnection of a generation facility with SVP is allowed without written authorization from SVP Electric Engineering Division.
DESIGN / PERFORMANCE – PRIOR TO ISSUANCE OF BUILDING PERMIT SVP1. Initial Information: Applicant shall provide a site plan showing all existing utilities, structures, easements, and trees. The applicant shall also include a detailed panel schedule showing all current and proposed electric loads.
SVP2. SVP Developers Work Drawing: Applicant shall have a developers work drawing created for the site by either an SVP estimator or through the applicant design process. All SVP standards and clearance requirements as defined in the General Section of the COA’s must be met, or variance approvals must be granted by SVP. The developers’ work drawing shall include but is not limited to: SVP substructure for primary, low voltage, streetlight, and fiber facilities. SVP facilities may extend off -site to the nearest ut ility connection point to tie-in with existing infrastructure as deemed necessary by SVP.
SVP3. Encroachment Permit: Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application with an approved SVP Developers Work Drawing for construction of electric utilities that comply with the latest edition of SVP Standards and Rules and Regulations, Electric Notes, and Electric Standard Details and Specifications.
SVP4. Applicants Switchgear: All applicant main switchgear with SVP meters must meet EUSERC standards and be approved by SVP’s meter shop prior to ordering. Switchgear for 12KV gear must have batteries sized for 4 hours of operation, no capacitive tripping, and 2 sets of relays, CTs, & PTs for each main. All double ended switchgear with a tie breaker, must include a kirk-key interlock scheme and an SVP provided warning label for the operation of the main tiebreaker.
SVP5. AMI/Fiber Building Requirements: All projects implementing high rise metering and multi-floor infrastructure requirements shall meet the requirements outlined in UG 0250 & FO1901.
DURING CONSTRUCTION – PRIOR TO OCCUPANCY
SVP6. Easements: Prior to the City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated underground electric utility easement (U.G.E.E) around the electric onsite facilities (Not a P.U.E). The electric utility easement shall be a minimum of 10 feet Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 15
wide around conduit and 5’ minimum around equipment and vault/manhole pads.
Additionally, the applicant shall submit plans defining existing easements so Electric Division can verify if there are any conflicts with new proposed easements or improvements. The Applicant shall grant to the City, without cost, all easements and/or right of way necessary for serving the property of the Applicant and for the installation of utilities (Santa Clara City Code chapter 17.15.110).
SVP7. Coordination Study: For any services taken at 12KV, a coordination study will need to be conducted by the applicant prior to energizing the service.
SVP8. Applicants Switchgear: Applicants’ switchgear will be inspected on site by SVP to ensure compliance with approved switchgear drawings. Electric meters and main disconnects shall be installed per Silicon Valley Power Standard MS-G7, Rev. 2.
SVP9. Electric Facilities: Prior to the City's issuance of Occupancy, the applicant shall construct all electric utilities per the approved SVP Developers Work Drawing. SVP will inspect all electric utility installations and all other improvements encroaching on electric facilities.
SVP10. Municipal Fees: Prior to electric service energization, all applicable fees per the City of Santa Clara’s Municipal Fee Schedule shall be paid by the applicant.
SVP11. Costs & Expenses: Unless expressly stated otherwise or covered by a fee to be paid by the applicant, applicant shall be responsible for all costs and expenses associated with fulfilling these conditions of approval.
OPERATIONAL CONDITIONS – AFTER OCCUPANCY
SVP12. Access: SVP will require 24 -hour unobstructed access to all SVP equipment which includes: manholes, transformers, vaults, switches, meters, indoor electrical rooms with SVP owned equipment etc.
WATER & SEWER DEPARTMENT
DESIGN / PERFORMANCE -- PRIOR TO ISSUANCE OF BUILDING PERMIT W1. Manifold Services: The final metering configuration shall be determined during the permit review of the project. Approval of this entitlement does not constitute approval of the metering configuration shown on the utility plan.
W2. Encroachment Permit. Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Uti lities will inspect all public water utility installations and all other improvements encroaching public water utilities.
W3. Utility Design Plans. Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details. Note that all new water meters and backflow prevention devices shall be located behind the sidewalk in a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.
W4. Utility Separations. Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 16
utilities, and all required minimum horizontal clearances from water services: 10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water services, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.
W5. Separate Services. Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right -of-way to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.
W6. City Standard Meters and Backflows. All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.
W7. Existing Services. The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.
W8. On-Site Storm Drain Treatment. Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system. The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system.
W9. Water Usage. Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).
W10. Landscaping. All the landscaping for the project shall comply with the California Water Conservation in Landscaping Act, Government Code Section 65591 et. seq. All plants shall be either California native or non-invasive, low water-using or moderate water-using plants. High water-using plants and nonfunctional turf are prohibited.
W11. Water Features. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities. Decorative water features may be permanently connected to the City’s recycled water supply.
W12. Easements. Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite.
The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right -of-way without overlapping any public utility easement. Additionally, the applicant shall submit plans Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 17
defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.
W13. Underground Fire Permit. Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408)615-2000. A dedicated fire service line, with an approved backflow prevention device, shall be used for on- site fire hydrants. Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.
DURING CONSTRUCTION
W14. City Standard Meters and Backflow Installation. No meters or backflows shall be installed prior to establishment of water service account with the Municipal Services Division of the Finance Department. The applicant shall provide a copy of the account information to the Water and Sewer Utilities Department Inspector and Meter Shop prior to installation of any meter or backflow. All meters and backflows approved for installation shall be tested prior to use. Water service connections shall not be used prior to authorization by the Water and Sewer Utilities inspector.
W15. Construction Water. This project shall use recycled water for all construction water needs for onsite and offsite construction.
W16. Water Shortage Response Actions. Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.
Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control.
b. restrict the use of potable water used for construction and dust control if recycled water is available.
This project is subject to all the requirements and restrictions of the Water Shortage Response Actions in place or adopted during the duration of the project. For more information, visit the City of Santa Clara Water & Sewer Utilities website at www.santaclaraca.gov/waterconservation.
PRIOR TO FINAL OF BUILDING PERMIT
W17. Record Drawings. Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as-built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the Director of Water & Sewer Utilities Department.
W18. Conditional Releases. The applicant shall comply with all the requirements of any building permit conditional release requirements.
Conditions of Approval PLN23-00577 / 2303 Gianera Street Meeting Date: July 15, 2025 Page 18
KEY:
G = General
P = Planning Division
E = Public Works Engineering (Stormwater)
SVP = Silicon Valley Power
FD = Fire Department
ST = Stormwater
SW = Solid Waste
L = Right of Way Landscape
E = Engineering
H = Housing
W = Water and Sewer
ACKNOWLEDGEMENT AND ACCEPTANCE OF CONDITIONS OF APPROVAL
Permittee/Property Owner
The undersigned agrees to each condition of approval and acknowledges and hereby agrees to use the project property on the terms and conditions set forth in this permit.
Signature: _________________________________________________
Printed Name: _________________________________________________
Relationship to Property: _________________________________________________
Date: _________________________________________________
Pursuant to Santa Clara City Code 18.128.100, the applicant shall return this document to the Department, properly signed and dated, within 30- days following the date of the Acknowledgement.