1 City of Santa Clara Water & Sewer Utility
Sewer System Management Plan
2 Table of Contents
ELEMENT 1: GOAL AND INTRODUCTION ............................................................................................................... 53
1.1 Regulatory Context ........................................................................................................................................ 53
1.2 Sewer System Management Plan Update Schedule ..................................................................................... 74
1.3 Sewer System Asset Overview ...................................................................................................................... 85 ELEMENT 2: ORGANIZATION ............................................................................................................................... 1410 ELEMENT 3: LEGAL AUTHORITY ......................................................................................................................... 1215 ELEMENT 4: OPERATION & MAINTENANCE PROGRAM ................................................................................... 1417
4.1 Updated Map of Sewer System ................................................................................................................. 1417
4.2 Preventative Operation and Maintenance Activities .................................................................................. 2018
4.3 Training ...................................................................................................................................................... 3228
4.4 Equipment Inventory .................................................................................................................................. 3329 ELEMENT 5: DESIGN & PERFORMANCE PROVISIONS .................................................................................... 3430
5.1 Updated Design Criteria and Construction Standards............................................................................... 3430
5.2 Procedures and Standards ........................................................................................................................ 3430 ELEMENT 6: SPILL EMERGENCY RESPONSE PLAN ......................................................................................... 3632 ELEMENT 7: SEWER PIPE BLOCKAGE CONTROL PROGRAM ......................................................................... 4538 ELEMENT 8: SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENT ........................... 4841
8.1 System Evaluation and Condition Assessment ......................................................................................... 4841
8.2 Capacity Assessment and Design Criteria ................................................................................................ 5042
8.3 Prioritization of Corrective Actions ............................................................................................................. 5143
8.4 Capital Improvement Plan ......................................................................................................................... 5143 ELEMENT 9: MONITORING, MEASUREMENT, PROGRAM MODIFICATIONS .................................................. 5545 ELEMENT 10: SSMP PROGRAM AUDITS ................................................................................................................ 40 ELEMENT 11: COMMUNICATION PROGRAM ......................................................................................................... 41 APPENDICES ............................................................................................................................................................. 42 ELEMENT 1: GOAL AND INTRODUCTION ................................................................................................................. 3
1.1 Regulatory Context .......................................................................................................................................... 3
1.2 Sewer System Management Plan Update Schedule ....................................................................................... 4
1.3 Sewer System Asset Overview ........................................................................................................................ 5 ELEMENT 2: ORGANIZATION ................................................................................................................................... 10 Authorized Representative .................................................................................................................................. 10 Responsibility for SSMP Implementation............................................................................................................. 10 SSO Reporting Chain of Communication ............................................................................................................ 10 ..................................................................................................................................................................................... 15 ELEMENT 3: LEGAL AUTHORITY ............................................................................................................................. 15 ELEMENT 4: OPERATION & MAINTENANCE PROGRAM ....................................................................................... 17
4.1 Updated Map of Sewer System ..................................................................................................................... 17
4.2 Preventative Operation and Maintenance Activities ...................................................................................... 18 Scheduled Preventative Maintenance ................................ ................................ .............................. 19
4.3 Training .......................................................................................................................................................... 22
4.4 Equipment Inventory ...................................................................................................................................... 22 ELEMENT 5: DESIGN & PERFORMANCE PROVISIONS ........................................................................................ 22
5.1 Updated Design Criteria and Construction Standards................................................................................... 22
5.2 Procedures and Standards ............................................................................................................................ 22 ELEMENT 6: SPILL EMERGENCY RESPONSE PLAN ............................................................................................. 22 ELEMENT 7: SEWER PIPE BLOCKAGE CONTROL PROGRAM ............................................................................. 22 ELEMENT 8: SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENT ............................... 22
8.1 System Evaluation and Condition Assessment ............................................................................................. 22
8.2 Capacity Assessment and Design Criteria .................................................................................................... 22
8.3 Prioritization of Corrective Actions ................................................................................................................. 22
8.4 Capital Improvement Plan ............................................................................................................................. 22
3 ELEMENT 9: MONITORING, MEASUREMENT, PROGRAM MODIFICATIONS ...................................................... 22 ELEMENT 10: SSMP PROGRAM AUDITS ................................................................................................................ 22 ELEMENT 11: COMMUNICATION PROGRAM ......................................................................................................... 22 APPENDICES ............................................................................................................................................................. 22
Appendix A: State Water Resources Control Board General Order 2022-0103-DWQ Appendix B: Santa Clara Municipal Code Excerpts
Appendix C: Enforcement Response Plan
Appendix D: Sanitary Sewer System Index Map
Appendix E: Sewer Equipment Inventories
Appendix F: City of Santa Clara Design Criteria
Appendix G: City of Santa Clara Standard Details
Appendix H: Emergency Response Procedures
Appendix I: FOG Program Materials and Handouts
Appendix J: City of Santa Clara Sewer Capacity Assessment Appendix K: Sewer Utility Budget
Appendix L: Performance Measure Data Sheets (Lucity)
Appendix M: SSMP Audit Checklist
Appendix A: State Water Resources Control Board General Order 2006-0003- DWQ and MRP
Appendix B: Santa Clara Municipal Code Excerpts Appendix C: Enforcement Response Plan Appendix D:
Sanitary Sewer System Index Map Appendix E:
Sewer Equipment Inventories Appendix F:
City of Santa Clara Design Criteria Appendix G:
City of Santa Clara Standard Details Appendix H:
Emergency Response Procedures Appendix I:
FOG Program Materials and Handouts
Appendix J: City of Santa Clara Sewer Capacity Assessment Appendix K: Sewer Utility Budget
Appendix L: Performance Measure Data Sheets (Lucity) Appendix M: SSMP Audit Checklist
5 ELEMENT 1: GOAL AND INTRODUCTIONS
1.1 Regulatory Context
The City of Santa Clara Water & Sewer Utilities Department (Utility) has prepared this Sewer System Management Plan (SSMP) to comply with the San Francisco Bay Regional Water Quality Control Board (RWQCB) and the State Water ResourceResources Control Board (SWRCB) General Order 2006-0003- 2022-0103-DWQDWQ (see Appendix A). This SSMPThe SSMP is intended to:
• Provide sufficient planning, description of resources and direction for staff to maintain, manage and repair the CityUtility’s sanitary sewer collection and conveyance system such that all sewer flows delivered to the CityUtility’s system are conveyed safely to the publicly owned wastewater treatment plant (San JoseJosée – Santa Clara Regional Wastewater Facility) without sanitary sewer overflows (SSOs).spills.
• This planThe SSMP includes actions to minimize the number and severity of SSOspills and to help mitigate the impact of SSOspills on the environment.
The This SSMPThe SSMP supports and supplements the CityUtility’s existing operations and maintenance program and goals by providing consolidated guidelines and procedures for the CityUtility’s sewer system management. The SSMP will also contribute to the proper management of the collection system by memorializing these activities.
In addition, a sewer system capacity study has been performed and was updated in 20 16 to determine what may beany improvements needed to insureensure the system has adequate capacity to convey all peak flows, now and forfor current and future development, including allowances for storm waters that may enter into the sewer system. The City is currently in the process of developing an update to its Sanitary Sewer
REQUIREMENTS
The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to:
• Properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s),
• Reduce and prevent spills,
• Contain and mitigate spills that do occur.
The collection system agency must develop goals to properly manage, operate, and maintain all parts of its wastewater collection system REQUIREMENTS The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to:
• Properly manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s),
• Reduce and prevent spills,
• Contain and mitigate spills that do occur.
The collection system agency must develop goals to properly manage, operate, and maintain all parts of its wastewater collection system
REQUIREMENTS
The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.
Formatted: Heading 2, Indent: Left: 0.15", Right: 0", Space Before: 10.55 pt
Formatted: Not Highlight
6 Master Plan, which includes the development of an “all-pipes” model, revised system-wide capacity studies, and an updated Capital Improvement Program. The Sanitary Sewer Master Plan is expected to be completed by the end of 2025 and before the next Sewer System Management Plan Update, and revised findings and recommendations will be describedincluded in the next Sewer System Management Plan. A draft of the in-progress report can be found in Appendix J.
Formatted: Not Highlight
Formatted: Not Highlight
7 1.2 Sewer System Management Plan Update Schedule
In accordance with Statewide Sanitary Sewer Systems General Order 2022 -0103-DWQ, the current SSMP Update is due May 2, 2025, with subsequent updates every 6 years. The next SSMP Update will be due May 2, 2031.
The audit period for the next planned Sewer System Management Plan audit will initiate November 2, 2025, and be completed by May 2, 2028. The audit should be submitted to the California Integrated Water Quality System (CIWQS) and will provide coverage through November 2, 2028 (by 6-months after the end of the 3- year audit period).
In order to prevent spills within its service area, the Utility implements system-wide condition assessment using closed-circuit television (CCTV) and routine & scheduled preventative maintenance including inspection, jetting, and repairs. A summary of these activities to be completed during the future 6-year SSMP update cycle is listed below, and further documented in Element 4 (Operation & Maintenance Program) :
• CCTV Inspection/Jetting – 8-year cycle last started April 2023 and is anticipated to be completed by April 2031.
• Force Main Assessment & Rehabilitation – Currently in-progress and is anticipated to be completed by the end of 2025.
• Lift/Pump Station Maintenance & Rehabilitation – Ongoing. Preventative maintenance is completed weekly, while pump servicing and repair is completed bi-annually in spring and fall. • Flow Monitoring and Capacity Studies, Sanitary Sewer Master Plan – Draft Sanitary Sewer Master Plan is currently in progress and is anticipated to be completed by the end of 2025. • New Vehicle and Equipment Purchases – Completed as needed based on replacement cycles. • National Association of Sewer Service Companies (NASSCO) Pipeline Assessment Certification Program (PACP) Training – Completed every three years based on certification date.
In addition, the Utility maintains a spill emergency response plan to mitigate spills if they occur, and performs long term system evaluation and capacity planning in order to design to system to accommodate peak wastewater flowsto meet future demands. These items are documented further in Element 4: Operation & Maintenance Program, Element 6: Spill Emergency Response Plan, and Element 8: System Evaluation, Capacity Assurance, Capital Improvements in the SSMP.
REQUIREMENTS
The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills.
Formatted: Heading 2, Indent: Left: 0.15", Right: 0", Space Before: 10.55 pt
Formatted: No bullets or numbering
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Bulleted + Level: 1 + Aligned at: 0.25" +
Indent at: 0.5"
Formatted: Not Highlight
8 1.3 Sewer System Asset Overview
The Utility owns and operates the sanitary sewer system serving the City of Santa Clara, located in Santa Clara County, California. The California Water Environmental Association’s Santa Clara Valley Section has recognized the Utility with Collection System of the Year (Medium Size Category) for 2020, 2023, and 2024, highlighting the Utility’s work to protect public health and the environment through its continued maintenance of it’s wastewater collection, treatment, and disposal system.
A map of the Utility’s sanitary sewer system and service area can be found in Appendix D. , as shown in Appendix D.A detailed electronic Sanitary Sewer System Service Area Boundary Map has been submitted to CIWQS, as required by Specifications 5.14 and Attachment E1.
The sewer system serves a population of approximately 131,000, and provides service to residential, commercial, and industrial users within its service area as quantified in Table 1-1 below. The Utility also accepts flow from Cupertino Sanitary District (CUSD) under an agreement executed in 1985.
Table 1-1: Service Connections by Service Type
User Type Number of Service
Connections
Residential 18,656
Commercial 2,012
Industrial 688
Institutional 384
REQUIREMENTS
The Agency Sewer System Management Plan must have an Introduction section to provide a description of the Agency-owned assets and service area including but not limited to:
• Location, including county(ies)
• Service area boundary (see specific requirements contained in Specifications 5.14 and Attachment E1, requiring an electronic Sanitary Sewer System Service Area Boundary Map submitted to CIWQS). • Population and community served.
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons.
• Structures diverting stormwater to the sewer system.
• Data management systems.
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals. • Estimated number or percent of residential, commercial, and industrial service connections.
• Unique service boundary conditions and challenge(s).
• Reference to the Enrollee’s up to-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment.
Formatted: Indent: Left: 0"
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Centered, Indent: Left: 0.42"
Formatted: Centered
Formatted Table
Formatted: Centered
Formatted: Centered
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Centered
Formatted: Not Highlight
Formatted: Centered
9 The sewer system infrastructure is comprised of approximately 288 miles of sewer main, as well as approximately 5,300 sewer manholes, 3 miles of pressurized (force) mains, 7 pump and lift stations, and 52 sewer system areWheeling of flowssewer system consists of approximately 288 miles of sewer mains. The decade of construction, size, and material of mains are shown in Table 1-2 on the following page.
Formatted: Not Highlight
Formatted: Indent: Left: 0", Right: 0.28"
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
10 Table 1-2: Sanitary Sewer Pipeline Inventory
Material
and Size Decade of Construction Total (ft) % of
Total
Unspecified 1930's and
earlier 1940's 1950's 1960's 1970's 1980's 1990's 2000's 2010's 2020's Vitrified Clay Pipe (VCP)
Unknown 14,639 411 205 3,189 204 18,649 1.26% 4 in. 22 275 527 824 0.06%
6 in. 966 74,671 22,566 67,545 19,237 7,124 2,801 2,739 518 801 198,967 13.47% 8 in. 9,023 5,210 17,650 328,475 204,792 46,811 9,320 7,779 9,045 1,325 639,429 43.28% 10 in. 51 128 2,805 61,018 37,739 6,475 4,232 6,923 11,242 1,442 132,056 8.94% 12 in. 4,889 772 1,966 35,914 61,293 86,888 9,259 14,264 5,818 4,002 862 225,926 15.29% 14 in. 284 183 507 974 0.07%
15 in. 822 2,995 20,541 18,542 12,922 1,875 1,484 373 2,549 151 62,254 4.21% 16 in. 1,418 1,123 65 2,607 0.18%
18 in. 1,398 9,457 18,738 7,373 5,362 3,269 1,045 917 47,560 3.22% 20 in. 599 599 0.04%
21 in. 1,522 2,016 3,483 3,565 1,055 671 12,312 0.83% 24 in. 3,280 9,840 6,450 15,884 5,011 840 1,137 929 43,371 2.94% 27 in. 116 2,648 5,513 706 33 575 2,437 12,028 0.81% 30 in. 1,228 15 645 875 6,746 7,003 25 248 3,992 20,777 1.41% 33 in. 1,079 522 5,890 4,367 258 101 12,216 0.83% 36 in. 1,114 1,972 1,663 11,972 16,720 1.13% 39 in. 2,262 1,199 3,461 0.23%
42 in. 1,937 3,602 2,233 3,216 484 11,471 0.78% 45 in. 288 364 795 1,447 0.10%
48 in. 3,139 1,169 6,172 343 2,524 283 13,630 0.92% Sub Total
(ft) 297,499 80,797 51,631 545,251 400,143 213,468 52,194 37,422 33,454 20,410 1,013 1,477,279 100.00% Reinforced Concrete (RCP)
20 in. 77 77 0.33%
24 in. 457 6,481 395 408 445 8,186 34.80%
27 in. 442 1,507 385 993 3,327 14.14%
30 in. 524 3,707 672 635 5,538 23.55%
33 in. 1,946 920 115 2,980 12.67%
36 in. 1,136 725 406 22 2,289 9.73%
42 in. 430 257 438 1,124 4.78%
Sub Total
(ft) 0 0 1,423 15,206 2,244 2,668 851 115 993 22 0 23,522 100.00% Polyethylene (PE)
6 in. 31 70 102 0.73%
8 in. 135 718 853 6.12%
Formatted: Not Highlight
Formatted Table
11 10 in. 588 205 270 1,063 7.62%
12 in. 306 1,893 148 2,309 4,656 33.39%
15 in. 203 203 1.46%
18 in. 284 284 2.03%
21 in. 736 2,427 3,163 22.68%
24 in. 1,179 373 340 1,030 2,922 20.95%
27 in. 401 401 2.88%
30 in. 236 236 1.70%
33 in. 62 62 0.44%
Sub Total
(ft) 306 0 0 4,907 0 774 409 794 0 6,754 0 13,944 100.00% Polyvinyl Chloride (PVC)
6 in. 67 66 133 21.16%
8 in. 73 73 11.61%
10 in. 71 71 11.32%
18 in. 97 97 15.50%
27 in. 254 254 40.41%
Sub Total
(ft) 67 0 0 66 241 0 0 0 0 0 254 628 100.00%
Unknown
Unknown 1,411 1,411 44.79%
8 in. 244 55 298 9.47%
10 in. 246 246 7.80%
12 in. 1,152 1,152 36.56%
21 in. 34 34 1.07%
24 in. 10 10 0.31%
Sub Total
(ft) 3,095 0 0 0 0 0 0 55 0 0 0 3,150 100.00%
Total (ft) 300,967 80,797 53,054 565,430 402,628 216,911 53,454 38,386 34,446 27,186 1,267 1,518,524 Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
12 Although private property owners own the entire length of the service lateral associated with their property, the Utility will clear blockages from the property line clean out to the City sewer main (“service the lower lateral”) as a courtesy service to the public; provided a property line cleanout exists, and the Utility is made aware of any problems or backups. Overall lateral maintenance and repair is sole responsibility of property owner.
The Utility has offers inexpensive clean out installations for all customer classes, including residential, commercial, industrial, and institutional. The Utility utilizes installed property line clean outs in order to provide maintenance to lower laterals as a courtesy when requested by customers.
The sanitary sewer system also includes two large pump stations, each with a flow meter, and five smaller unmetered lift stations. All stations have radio telemetry to monitor operating status.
Pump and Lift Station information is included in the following table:
Table 1-3: Pump & Lift Station Equipment
Station Equipment
Rabello Pump Station
Eight 60 horsepower Flygt 3202 Pumps
600 kW diesel generator
Northside Pump station Four 70 horsepower Flygt 3356 Pumps 350 kW diesel generator
Tasman Two 10 horsepower Flygt 3127 Pumps
Westside Two 10 horsepower Flygt 3127 Pumps
Primavera Six 10 horsepower Flygt 3127
pumps,
75 KW Generator (LPG fuel primary
with natural gas backup)
De La Cruz Two 10 horsepower Flygt 3127
Pumps, 50KW diesel generator
(Trailer mount)
Stadium Pump Station
6 Flygt Pumps (4 - 15hp model 3153 and 2 - 10hp
model 3127), 80 kw diesel generator
All sewer pumps utilize industry-leading equipment that is not only efficient but features the latest advancements in no-clog impeller designs that are superior to technology used previously. The Utility standardizes pump product lines enabling each station to have a backup pump readily available at the sewer shop.
In December 2020, the Utility completed work to upgrade the core hardware, software, and network equipment supporting the Utility’s supervisory controls and data acquisition (SCADA) System. This SCADA upgrade was intended to provide a state-of-the-art SCADA system deployed on a fast, reliable, redundant, and secure fiber optic ring, and to provide increased functionality in sewer facility site monitoring and control. This upgrade included 2 new servers, 3 workstations and 4 client PC’s, as well as 8 new managed switches and 4 uninterruptable power supplies. The upgrade involved re-deploying the network over a newly installed, purpose-built, fiber optic ring, connecting key sites at the Corporation Yard SCADA building, the Corporation Yard Ops center, the Emergency Operations Center, and the Data Center at City Hall. The Utility also deployed a second Formatted: Indent: Left: 0", First line: 0", Right: 0.28", Space Before: 0 pt
Formatted: Indent: Left: 0", Right: 0.28"
Formatted: Indent: Left: 0", Right: 0.28"
Formatted: Indent: Left: 0", Right: 0.28"
Formatted: Not Highlight
Formatted Table
Formatted: Indent: Left: 0", First line: 0", Right: 0.28" Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
13 antenna and master radio at the Corporation Yard to rectify a “single point of failure” problem that had previously existed on the Utility’s legacy radio network. As part of this SCADA upgrade, all sewer pump stations were upgraded and converted to the new fiber network.
The Utility owns and operates the sanitary sewer system, with exceptions as described below:
• Sewer Laterals – Pursuant to City Ordinance 1901 passed 11/27/2012, property owners are responsible for maintenance and operation of the entire lateral up to the wye connection to the public main.
• Private Onsite Sewer Systems – Private onsite sewer systems are the responsibility of the property owner for the associated property, up to the connection to the public main or manhole.
• Sewer Maintained by Other Agencies – City of San Jose and City of Sunnyvale own and maintain a portion of sewer lines within City of Santa Clara right-of-way, as shown in provided sewer maps.
The Utility’s sewer system includes several instances of unique constraints and boundary conditions.
• Siphons – The Utility’s sewer system includes 59 siphons as listed in Table 4-6. • Transportation Agency Right-of-Way – Caltrans owns the right-of-way along El Camino Real and the highways/freeways traversing the City. County owns the right-of-way along the expressways traversing the City. Encroachment permitting and/or maintenance agreements are required to perform work in their respective right-of-way. • Rail Agency Right-of-Way – Rail belonging to United Pacific Railroad (UPRR), Caltrain, and other transit agencies traverse the City, resulting in utility constraints across rail agency right-of-way. Encroachment permitting and/or maintenance agreements are required to perform work in their respective right-of-way.
• Surface Water Right-of-Way – Santa Clara Valley Water District (SCVWD) owns the right- of-way along Guadalupe River, Calabazas Creek, San Tomas Aquino Creek, and Saratoga Creeks traversing the City, resulting in utility constraints crossing and adjacent to surface waters. Encroachment permitting and/or maintenance agreements are required to perform work in SCVWD right-of-way.
• Department of Toxic Substances Control (DTSC) Regulated Sites – Several locations in City right-of-way are considered DTSC Regulated Sites due to contaminated soils. DTSC must be notified prior to work in these locations.
• Cupertino Sanitary District Tributary Lines – The Utility has an agreement with CUSD to convey flows through the Utility’s sanitary sewer system to the Regional Wastewater Facility (RWF).
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
14 ELEMENT 2: ORGANIZATION
Authorized Representative
The staff positions of Water and Sewer Maintenance Worker, Sewer Inspection Technician, Equipment Operator, Pump Maintenance Technician, Utility Crew Supervisor, or those employees responding to the SSO are all responsible for estimating the volume of any spill. The Water and Sewer Operations Manager, Water and Sewer Superintendent, and Assistant Sanitary Sewer Superintendent are responsible for verifying the data collected in the field and reporting all sewer spills per the reporting requirements of both the State Water Resources Control Board (State Water Board) and the Regional Water Quality Control Board (RWQCB).
The City’s authorized representative in all wastewater collection system matters is the Director of Water and Sewer Utilities. The Water and Sewer Operations Manager is authorized as the legally responsible official (LRO) to certify electronic spill reports submitted to the Boards. The Water and Sewer Superintendent is authorized to act in the Water and Sewer Operations Manager’s absence. The Assistant Director and Director of the Water and Sewer Utilities are also authorized as LROs and can certify electronic spill reports.
Authorized Representative
The Utility’s authorized representative in all wastewater collection system matters is the Director of Water and Sewer Utilities. The Water and Sewer Superintendent is authorized as the legally responsible official (LRO) to certify electronic spill reports submitted to the Boards. The Assistant Director and Director of the Water and Sewer Utilities are also authorized as LROs and can certify electronic spill reports.
Responsibility for SSMP Implementation
The Water and Sewer Operations Manager and the Water and Sewer Operations ManagerSuperintendent areis responsible for implementing and maintaining all elements of this SSMPthe SSMP to ensure it is up to date.
SpillSO Reporting Chain of Communication
The staff positions of Water and Sewer Maintenance Worker, Sewer Inspection Technician, Equipment Operator, Pump Maintenance Technician, Utility Crew Supervisor, or those employees responding to the SSOspill are all responsible for estimating the volume of any spill.
The Water and Sewer Operations Manager, Water and Sewer Superintendent, and Assistant
REQUIREMENTS
The SSMP must identify:The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organizational chart of other similar narrative documentation that includes:
The name of the responsible or authorized representative; • The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order. •(a) The names and telephone numbers for management, administrative, and maintenance positions responsible for implementing specific measures in the SSMP program. Include lines of authority as shown in an organization chart or similar document with a narrative explanation; and
(b) The names and telephone numbers for management, administrative, and maintenance positions responsible for implementing specific measures in the SSMP program. Include lines of authority as shown in an organization chart or similar document with a narrative explanation; andThe position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements.
(c) Organizational lines of authority.
•(d) CThe chain of communication for reporting spills SSOs, from receipt of a complaint or other information, including the person responsible for reporting spillSSOs to the State and Regional Water Board and other agencies if applicable (such asFor example, cCounty hHealth oOfficer, cCounty eEnvironmental hHealth aAgency, and/or State Office of Emergency Services (OES)).
Formatted: Space Before: 0 pt
Commented [LT1]: Paragraph should be moved. To
SS O Reporting chain of communication. Related to
spill chain of communication and not authorized
representative.
Check to make sure it’s in line with the Element 9
section
Formatted: Heading 2, Indent: Left: 0.15", Space
Before: 10.55 pt
Formatted: Body Text, Indent: Left: 0.13"
Formatted: Right: 0.78", Space Before: 3 pt
Formatted: Body Text, Indent: Left: 0.13"
Formatted: Body Text, Indent: Left: 0.13"
Formatted: Font: 10 pt, Italic
Formatted: Normal, Indent: Left: 0.1", Space Before:
3.3 pt, No bullets or numbering, Tab stops: Not at
0.81"
Formatted: List Paragraph, Numbered + Level: 1 +
Numbering Style: a, b, c, … + Start at: 1 + Alignment:
Left + Aligned at: 0.39" + Indent at: 0.6"
Formatted: Font: 10 pt, Italic
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
15 Sanitary Sewer Superintendent are responsible for verifying the data collected in the field and reporting all sewer spills per the reporting requirements of both the State Water Resources Control Board (State Water Board) and the Regional Water Quality Control Board (RWQCB).
Table 2-1Table 2-1 contains the City’s Key Emergency Contact Information and Attachment H documents the Figure 2-1 shows the Chain of Communication for Responding to SSOspills and Flow charts for SSOSpill Notification and Reporting to Regulatory Agencies.
Formatted: Not Highlight
Formatted: Not Highlight
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
16 Table 2-1: City Key Emergency Contact List
Name Business Hours After Hours
John Ramirez
Gary Welling
Director
(LRO)
408-615-2018 *On File
Shilpa Mehta, P.E.VACANT
Assistant Director
(LRO)
408-615-2011 *On File
Susan PanAhmed Aly, P.E.
Principal Engineer 408-615-2014 *On File
Nelson Lui,Lawrence Tam, P.E.
Utility Operations Engineer 408-615-
20012036001 *On File
Garrett Brown
Water and Sewer Superintendent
( LRO)
408-615-2071
*On File
Daniel Bobias
Acting Assistant Sewer
SSuperintendent
(Data Submitter)
408-615-
20712068
*On File
Diane Ascuncion Wendy
Kwong
Water and Sewer Acting
Compliance Manager
408-615-2006 *On File
John SanchezColleen Trostle
Assistant Water Superintendent -
ConstructionPublic Works Compliance
Manager
408-615-
2061406-615-
3099
*On File
Craig Mobeck
Director Public Works 408-615-3001 *On File
Dave Staub
Street DepartmentDeputy Director of Public
Works – Storm 408-615-3080 *On File
*Emergency after-hours and personal contact numbers are on file with key agencies, the wastewater treatment facility, and key operational staff. Call down list is maintained and revised as necessary.
Organization Discussion
The City of Santa Clara is a charter city with a council-adopted municipal code. The municipal government provided by this Charter is the “council-manager” form of government. The City’s chief executive officer is the City Manager, who has appointing authority for all staff, including staff for the water and sewer utilities. An Organization Chart is attached as Figure -2-12. The chain of command for the sewer system includes:
• Director of Water and Sewer UtilityUtilities
• Assistant Director of Water and Sewer UtilityUtilities • Utility Operations Engineer
• /Principal Engineer
• Compliance Manager
• Code Enforcement Officer
• Code Enforcement Technician
• Utility Business Systems Manager
• Utility Business Systems Specialist
Formatted: Not Highlight
Formatted: Not Highlight
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
17 • Water and Sewer Operations Manager
• Water and Sewer Superintendent
• Assistant Sanitary Sewer Superintendent
• Water and Sewer Utility Crew Supervisors
• Equipment Operators
• CCTV Sewer Inspection Technician
• Pump Maintenance Technician
• Water and Sewer Maintenance Workers
Discussion of General Responsibilities Water and Sewer Utilities:
The following is a brief discussion of the general responsibilities of staff positions in the Water and Sewer Utilities department.
Director of Water and Sewer Utilities: Directs the Department of Water and Sewer Utilities in the planning, design, installation, operation, repair, and maintenance of the CityUtility’s water supply and distribution system, and the operation, repair, and maintenance of the CityUtility’s sanitary sewage collection system.
Assistant Director of Water and Sewer Utilities: Under the direction of the Director of Water and Sewer Utilities: plans, develops, coordinates, and directs the activities of the Water and Sewer Utilities and plans, organizes, and administers operations and maintenance activities related to the sanitary sewer system.
Principal Engineer/Utility Operations Engineer: Under the direction of the Assistant Director of Water and Sewer Utilities, plans, develops, coordinates the activities of the Water and Sewer Utilities including but not limited to construction and operations and maintenance related to sanitary sewer system.
Compliance Manager: Under the direction of the Assistant Director of Water and Sewer Utilities:
manages water and sewer utility compliance with applicable regulations, standards and policies governed by Federal, State and local regulatory agencies, and when necessary direct corrective action.
Code Enforcement Officer: Under the direction of the Compliance Manager, manages Fat, Oil and Grease (FOG) program and coordinates with Sanitary Sewer Operations staff, the customers, other Ccity Departments and regulatory agencies.
Code Enforcement Technician: Assist the Code Enforcement Officer in FOG plan reviews and inspection program.
Utility Business Systems Manager: Under the direction of the Assistant Director manages the Lucity sewer work order system for the sewer cleaning, assessment and repair. Coordinates with the engineers, Public Works Department, contractors, sewer operations staff on sewer information and updates the database and GIS maps.
Utility Business Systems Specialist: Assists Utility Business Systems Manager in coordinating and managing the sewer work order system, Lucity database and GIS maps.
Water and Sewer Operations Manager: Under the direction of the Assistant Director of the Water and Sewer Utility: plans, organizes and directs the work of field forces engaged in the construction, maintenance and operation of the CityUtility’s sanitary sewer collection system.
Water and Sewer Superintendent: Under the direction of the Water and Sewer Operations Manager: plans, organizes and directs the work of field forces engaged in the construction, maintenance and operation of the CityUtility’s sanitary sewer collection system.
Formatted: Font: Bold, Underline
Formatted: Body Text, Indent: Left: 0.19"
Formatted: Underline
Formatted: Font: 10 pt
Formatted: Font: Italic
Formatted: Font: Italic
Formatted: Font: Italic
Formatted: Font: Italic
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
18 Assistant Sanitary Sewer Superintendent: Under the direction of either/or Water and Sewer Operations Manager and Assistant Director of the Water and Sewer SuperintendentUtility:
assigns, reviews and supervises the work of utility crews engaged in the operation and maintenance of CityUtility’s sanitary sewage collection system and storm drain pump stations.
Utility Crew Supervisor: Under the direction of the Assistant Sanitary Sewer Superintendent, supervises the work of an assigned crew in a specialty area typically, but not limited to: sewer construction and maintenance, pumps and pump station repair, station generators and electrical/control appurtenances , sewer main cleaning and televising, and related maintenance of sewer conveyance system.
Equipment Operator: Under direction of the Utility Crew Supervisor, performs skilled work in the maintenance, construction and operation of streets, water, recycled water, and/or sewer systems using medium and heavy power-driven equipment as a major assignment.
CCTV Inspection Technician: Under direction of the Utility Crew Supervisor, performs inspection of sanitary sewer mains, laterals, and manholes using specialized video inspections and associated software for ongoing condition assessments of sanitary sewer infrastructure.
Pump Maintenance Technician: Under direction of the Utility Crew Supervisor, performs installation, operation, and routine maintenance of wastewater related pumps and pump stations and their appurtenances.
Water and Sewer Maintenance Worker I & II: Under direction of the Utility Crew Supervisor, independently or as a member of a crew, performs skilled work in the construction, maintenance and operation of the water, recycled water and sewer systems.
Water and Sewer Maintenance Worker I: Under direction of the Utility Crew Supervisor, operates a variety of hand and power tools and equipment used in public works, water, recycled water, and sewer utility maintenance and construction work.
Discussion of General Responsibilities Public Works:
Discussion of General Responsibilities Public Works:
The following is a brief discussion of the general responsibilities of staff positions in the Department of Public Works.
Director of Public Works: Plans long range projects and gives overall direction to the work of the Public Works Department and directs the preparation of plans, specifications, estimates and contracts for public works projects including streets, sewers, storm drains, transportation and municipal or public structures and buildings.
Principal Engineer/Utility Operations Engineer: Under direction of the Director of Public Works:
assigns, directs and supervises professional and sub-professional employees engaged in a variety of public works projects from early planning stages through final construction and acceptance, including the sewer system.
Senior/Associate/Assistant Civil Engineer: Under the direction of the Principal Engineer:
conducts studies and analysis of engineering projects or problems and prepares technical reports on matters of public interest. Prepares plans, specification and cost estimates for a variety of construction and maintenance projects including streets, storm drains, sewers, traffic signals and other public facilities.
Public Works Inspector: Under general supervision performs inspections for compliance with plan and specification requirements, keeps daily records of work performed, performs quantity calculations and accounting, and monitors project safety of construction projects within street rights-of-way on City property.ty.
Formatted: Not Highlight
Formatted: Indent: Left: 0"
Formatted: Font: 10 pt, Bold, Underline
Formatted: Normal, Indent: Left: 0.13"
Formatted: Underline
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
8 Figure 2-1: SSO Notification and Reporting Flowchart
Commented [MD2]: Need to update
Commented [BM3]: Didn’t we update this flowchart as
part of the new Response Plan?
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
9 City of Santa Clara
Sanitary Sewer Overflow (SSO
Notification and Reporting)
Effective: September 9, 2013
1 if one SSO event results in
multiple appearance points in
a sewer system asset, the
enrollee shall complete one
SSO report in the CIWQS
Online SSO Database which
includes the GPS coordinates
for the location of the SSO
appearance point closest to
the failure point, blockage or
location of the flow condition
that caused the SSO, and
provide descriptions of the
locations of all other
discharge points associated
with the SSO event.
Items 1-14 in Draft
Reports, and
Items 1-6, and 17
in Certified
Reports
May be
voluntaril
y reported
to CIWQS
Category 1 and
Category 2*
SSO Reporting
Requirements
Category 3
SSO Reporting
Requirements
Private Lateral
Sewage Discharge
Reporting
Requirements
Certified Report –
submitted to
CIWQS within 30
calendar days of the
end of month in
which the SSO
occurred
SSO Technical Report
Requirements
Submitted within 45
calendar days of the
SSO end date for
spills of 50,000
gallons or greater
1. Causes and Circumstances of the SSO:
a. Complete and detailed explanation of how
and when the SSO was discovered.
b. Diagram showing the SSO failure point,
appearance point(s), and final destination(s)
c. Detailed description of the methodology
employed and available data used to calculate
the volume of the SSO, and if applicable, the
SSO volume recovered.
d. Detailed description of the cause(s) of the
SSO
e. Copies of original field crew records used to
document the SSO.
f. Historical maintenance records for the failure
location
2. Enrollee’s Response to SSO:
a. Chronological narrative description of all
actions taken by enrollee
b. Explanation of how the SSMP Overflow
Emergency Response plan was implemented
to respond to and mitigate the SSO
c. Final corrective action(s) completed and/or
planned to be completed, including a schedule
for actions not yet completed.
3. Water Quality Monitoring:
a. Description of all water quality sampling
activities conducted including analytical results
and evaluation of the results.
b. Detailed location map illustrating all water
quality sampling points.
Draft Reports –
submitted to CIWQS
within 3 business
days
1. SSO Contact Information: Name &
telephone number of enrollee contact
person who can answer specific questions
about the SSO being reported.
2. SSO Location Name
3. Location of the overflow event (SSO) by
entering GPS coordinates1
4. Whether or not the SSO reached surface
water, a drainage channel, or entered and
was discharged from a drainage structure.
5. Whether or not the SSO reached a
municipal separate storm drain system.
6. Whether or not the total SSO volume
that reached a MS4 drain system was fully
recovered.
7. Estimate of the SSO volume, inclusive of
all discharge point(s).
8. Estimate of the SSO volume that
reached surface water, a drainage channel,
or was not recovered from a storm drain.
9. Estimate of the SSO volume recovered
(if applicable)
10. Number of SSO appearance points
11. Description & location of SSO
appearance point(s). If a single sanitary
sewer system failure results in multiple
SSO appearance points, each appearance
point must be described
12. SSO start date and time
13. Date and time the enrollee was notified,
or self-discovered, the SSO
14. Estimated operator arrival time
15. For spills greater than or equal to 1,000
gallons, the date and time Cal OES was
called
16. For spills greater than or equal to 1,000
gallons, the Cal OES control number.
*Draft Category 2: Items 1-14 from above.
Certified Reports –
submitted to CIWQS
within 15 calendar
days of the end date
of the SSO
All information in Category 1 Draft Report, and
in addition:
1. Description of SSO destination(s).
2. SSO end date and time.
3. SSO Causes (mainline blockage, roots, etc.).
4. SSO failure point (main, lateral, etc.).
5. Whether or not the spill was associated with
a storm event.
6. Description of spill corrective action,
including steps planned or taken to reduce,
eliminate, and prevent reoccurrence of the
overflow; and a schedule of major milestones
for those steps.
7. Description of spill response activities
8. Spill response completion date.
9. Whether or not there is an ongoing
investigation, the reasons for the investigation
and the expected date of completion.
10. Whether or not a beach closure occurred or
may have occurred as a result of the SSO.
11. Whether or not health warnings were
posted as a result of the SSO.
12. Name of beach(es) closed and/or
impacted. If no beach impacted, select NA
13. Name of surface water(s) impacted.
14. If water quality samples were collected,
identify parameters the water quality samples
were analyzed for. If no samples were taken,
select NA
15. If water quality samples were taken, identify
which regulatory agencies received sample
results. If no samples taken, select NA.
16. Description of methodology(ies) and type of
data relied upon for estimations of the SSO
volume discharged and recovered.
17. SSO Certification: Upon SSO certification,
the CIWQS Online SSO Database will issue a
final SSO ID number.
*Certified Category 2: Items 1-14 in Draft
Report, and Items 1-9, and 17 from above.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
10 Figure 2-1: Existing Organizational Structure
Formatted: Heading 4, Indent: Left: 2.24", Space
Before: 4.65 pt
Formatted: Not Highlight
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
11 Formatted: Normal, Centered, Indent: Left: 0"
Formatted: Normal, Centered
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
12 ELEMENT 3: LEGAL AUTHORITY
The legal authority of the City of Santa Clara rests in the City’s charter (ref: Section 400, Article IV Powers) and is adopted by City code. (Copies of current City of Santa Clara codes are available on line at: http://www.codepublishing.com/ca/santaclara/frameless/)
The City of Santa Clara’s Ordinance number 1839 adopted an updated and revised Chapter
13.10 for the Code of the City of Santa Clara, California on November 24, 2009. Chapter 13.10 (entitled “Sewers”) of Title 13 (entitled “Public Services”) is attached as Appendix B.
Title 17 (see Appendix B) addresses general design criteria as well as design requirements specific to sewer design. 17.05.630 requires use of City’s Standard Design Criteria as adopted by the City Engineer, which includes the following ordinance sections:
Section 17.05.630 Design
Section 17.15.220 Rules and Regulations for Sewer System development – Sanitary Sewer and Storm Drains
Demonstration of Legal Authority
Title 13, chapter 13.10 “Sewers” codifies all requirements related to sewers and specific to waste discharge requirements for the sanitary sewer system.
A copy of the Legal Authority Checklist is attached as Table 3-1.
This checklist is provided as a short-cut tool for RWQCB inspection and auditing procedures to the Sewer Ordinance.
The CityUtility also maintains an Enforcement Response Plan (Appendix C) which serves as a step by stepstep-by-step guidance document for sewer user compliance.
REQUIREMENTS
The Agency Sewer System Management Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority.Requirement: Demonstrate, through sanitary sewer system ordinances, service agreements, or other legally binding procedures, that it possesses the necessary legal authority to:
(a) Prevent illicit discharges into its wastewater sanitary sewercollection system (I&I); (examples may include infiltration and inflow (I/I) unauthorized, storm water, chemical dumping, unauthorized debris; and cut roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages ., etc.);
(a)(b) Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure.
(b)(c) Require that sewers and connections be properly designed and constructed;constructed.
(c)(d) Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operatedmaintained by the enrolleeCity;. (d) Limit the discharge of fats, oils, and grease and other debris that may cause blockages;
(e) Enforce any violatioviolation(s) ofn of ordinances, service agreements, or other legally binding procedures. its sewer ordinances;
(f) Authority to inspect grease producing dischargers; and (g)(f) Authority to enforce sewer-related ordinances.Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
13 Table 3-1 GWDR Legal Authority Checklist
GWDR Requirement
Agency Code
Reference
Adequate to
Meet SSMP
Requirements?
Public Sewers
Ability to prevent illicit discharges into the wastewater collection system
13.10.230 -
13.10.410 Yes
Ability to limit the discharge of fats, oils, and grease and other debris that may cause blockages
13.10.270
13.10.280 Yes
Ability to require that sewers and connections be properly designed and constructed
13.10.030,
17.05.630
17.15.220
17.15.280
Yes
Ability to require proper installation, testing, and inspection of new and rehabilitated sewers
13.10.040,
17.15.280 Yes
Laterals
Provide clear support for Agency responsibility (upper
and/or lower lateral) and policies (e.g. courtesy cleaning, repair, cleanout installation)
13.10.040
Yes
Ensure access for maintenance, inspection, or repairs for portions of the service lateral owned or maintained by the Agency
13.10.040
Yes
Ability to control infiltration and inflow (I/I) from private service laterals 13.10.230 Yes
Satellite Collection Systems
Ability to control infiltration and inflow (I/I) from satellite collection systems 13.10.230 Yes
FOG Source Control
Requirements for the installation of grease removal
devices (GRD) 13.10.380 Yes
Ability to set design standards for GRDs 13.10.210,
13.10.270 Yes
Ability to set maintenance requirements for GRDs 13.10.380 Yes Ability to require application of best management
practices 13.10.210 Yes
Ability to require record keeping and reporting of GRD
maintenance and repair 13.10.520 Yes
Authority to inspect grease producing facilities 13.10.570 Yes Enforcement
Ability to enforce any violation of the Agency’s sewer
ordinances
13.10.530 –
13.10.660 Yes
Other Requirements (Recommended but not required
by GWDR)
Define lateral ownership and maintenance responsibility City Oordinance 1901 Yes
Prohibit vandalism California Penal
Code 594(c)(2) Yes
Ability to deal effectively with private lateral problems (e.g. force property owner to correct failed/plugged private
building sewer)
8.30.040
Yes
Formatted Table
Formatted: Font: Arial, 10 pt
Formatted: Centered
Formatted: Font: Arial, 10 pt
Formatted: Centered
Formatted: Centered
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
14 ELEMENT 4: OPERATION & MAINTENANCE PROGRAM
4.1 Updated Map of Sewer System
Collection
System Maps
The City of Santa Clara Water and Sewer Utilities DepartmentUtility prepares and updates the sanitary sewer system maps (block books) continuously in CAD and/or GIS map and every three to four years publishes in a bounded 11” x 17” combed binding.publishes compiled updates approximately every 4 years.
These updates are based on as-built information collected by the City’s Public Works Field Services Division inspection staff and Sewer Ddivision operations and maintenance personnel.
REQUIREMENTS
The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates. The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.
Requirement:
(a) Maintain an up-to-date map of the sanitary sewer system, showing all gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable storm water conveyance facilities;
(b) Describe routine preventivePreventative operation and maintenance activities by staff and contractors, including a system for scheduling regular maintenance and cleaning of the sanitary sewer system with more frequent cleaning and maintenance targeted at known problem areas. The Preventative Maintenance (PM) program should have a system to document scheduled and conducted activities, such as work orders;
(c) Develop a rehabilitation and replacement plan to identify and prioritize system deficiencies and implement short-term and long-term rehabilitation actions to address each deficiency. The program should include regular visual and TV inspections of manholes and sewer pipes, and a system for ranking the condition of sewer pipes and scheduling rehabilitation. Rehabilitation and replacement should focus on sewer pipes that are at risk of collapse or prone to more frequent blockages due to pipe defects. Finally, the rehabilitation and replacement plan should include a capital improvement plan that addresses proper management and protection of the infrastructure assets. The plan shall include a time schedule for implementing the short- and long-term plans plus a schedule for developing the funds needed for the capital improvement plan;
(d) Provide training on a regular basis for staff in sanitary sewer system operations and maintenance, and require contractors to be appropriately trained; and
(e) Provide equipment and replacement part inventories, including identification of critical replacement parts.
Formatted: Font: 10 pt
Formatted: Body Text, Indent: Left: 0.15", Right:
0.28", Space Before: 4.65 pt
Formatted: Indent: Left: 0.42", Right: 0.99", Space
Before: 0 pt
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
15 The following information is included in current map books:
● force mains ● private mains
● manholes ● manhole numbers
● direction of flow ● flushing inlet
● laterals (with dimensions) ● depth of manhole
● diameter of mains ● pipe materials
● year pipe installed ● siphons
● lift stations ● pump stations
● chart station ● private systems
● other sewer mains (not City) ● distance between manholes
Since the block book itself constitutes more than one hundred pages it is only referenced in this document. Appendix D is theshows Index sheet for the block book for the City of Santa Clara’sUtility’s collection system.
Formatted: Indent: Left: 0.42", Right: 0.76", Space
Before: 4.65 pt
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
16 Information in the block book is available at the Water and Sewer Utility.
Routine Operations and Maintenance
The City of Santa Clara has a populationpopulation of approximately 129,000. The sewer system serves residential customers as well as commercial and industrial businesses. The City’s service area is contained within City limits. The City also accepts flow from Cupertino Ssanitary District (CUSDCuSD) under an agreement executed in 1985.
All wastewater collected by the City’s sewer system is conveyed to the jointly owned San JoseSan José – Santa Clara Regional Wastewater Facility (Facility) for treatment. The Facility is a tertiary treatment facility that discharges to Artesian Slough, tributary to Coyote Creek and South San Francisco Bay, and supplies recycled water to over 270 customers via the South Bay Water Recycling Program.
The sanitary sewer system consists of approximately 270 miles of sewer mains. The decade of construction, size, and material of mains are shown in the table on the following page.
VCP = Vitrified Clay Pipe RCP = Reinforced Concrete Pipe CIP = Cast Iron Pipe DIP = Ductile Iron Pipe
PVC = Polyvinylchloride Pipe SanititePE = PolyethyleneSanitite Pipe = Double and Triple Wall
Formatted: Indent: Left: 0"
Commented [LT4]: Not really sure what this sentence
is supposed to convey.
Formatted: Indent: Left: 0.42", Right: 0", Space
Before: 0.05 pt
Commented [LT5]: Beginning here to start of 4.2
seems out of place. This is about updating and having
current maps. Think this is more appropriate in Section
1.3 Sewer System Asset Overview.
Commented [LT6]: No CIP or DIP shown in the table.
Commented [LT7]: Sanitite is a brand name but is PE
Formatted: Body Text, Indent: Left: 0.42", Right: 0.7" Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
17 Material and
Size
Decade of Construction Total (ft) % of Total
Unspecified 1910's &
1920's
1930's 1940's 1950's 1960's 1970's 1980's 1990's 2000's 2010's Vitrified Clay
Pipe (VCP)
Unknown 14,791
411 243 3,132
204
18,782 1.27%
4 in. 91
236
275
527 1,130 0.08%
6 in. 1,885 81,799 638 22,598 70,312 15,589 7,054 3,409 3,408 980 782 208,455 14.07% 8 in. 124,989
14,851 272,956 160,179 39,995 8,893 7,501 5,811 1,394 636,568 42.97% 10 in. 27,483
2,030 49,813 29,414 4,192 2,867 5,458 7,520 753 129,531 8.74% 12 in. 65,128 398
1,035 26,311 50,348 61,724 8,070 11,843 3,227 3,301 231,385 15.62% 14 in. 433
186
507 1,126 0.08%
15 in. 10,314
2,921 17,816 14,436 9,028 2,183 1,453 83 2,524 60,756 4.10% 16 in. 1,429
282 302
65 2,078 0.14%
18 in. 9,764
965 9,114 13,999 4,922 3,317 3,199 501 917 46,698 3.15% 20 in.
77 187
596 860 0.06%
21 in. 5,635
2,016 2,346 2,061 1,115
13,173 0.89%
24 in. 11,329
8,318 4,200 14,234 4,313 1,168 1,104 900 45,566 3.08%
27 in. 1,702
116 2,428 4,629 598
49 2,437 11,958 0.81%
28 in. 289
289 0.02%
30 in. 5,493
613 396 6,393 4,442
47 172 3,992 21,549 1.45%
33 in. 2,096
1,079 98 5,049 4,488
258
13,067 0.88%
36 in. 2,404
752 1,405 594 2,534
7,690 0.52%
39 in. 482
1,780 1,199
3,461 0.23%
42 in. 3,432
3,297 2,282 3,122 354
12,486 0.84%
45 in. 243
364 792
1,399 0.09%
48 in. 8,086
1,169
1,902 457
1,416 283 13,312 0.90%
Sub Total (ft) 297,499 82,197 638 46,618 465,040 316,064 160,911 37,992 34,378 21,072 18,910 1,481,320 100.00% Reinforced
Concrete (RCP)
24 in. 479
457 6,000 395
402
7,733 36.74%
27 in. 993
442 1,507
2,942 13.98%
30 in. 1,252
368 4,121
325
115
6,182 29.37%
33 in.
1,531 806
2,337 11.10%
36 in. 1,202
651
1,853 8.80%
Sub Total (ft) 3,926 0 0 1,267 13,810 1,201 325 402 115 0 0 21,046 100.00% Polyethylene
(PE)
6 in. 102
102 0.82%
8 in. 135
718 853 6.84%
12 in. 2,344
2,275 4,619 37.03%
16 in.
97 97 0.78%
18 in. 284
588
872 6.99%
21 in.
736
2,427 3,163 25.35%
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
18 24 in.
1,179
1,030 2,209 17.71%
30 in. 236
236 1.90%
33 in. 62
62 0.49%
36 in. 12
12 0.10%
42 in. 114
135
250 2.00%
Sub Total (ft) 3,289 0 0 0 2,638 97 0 0 0 0 6,450 12,474 100.00% Reinforced
Plastic
PipePolyvinyl
Chloride (PVC)
(RPM)
8 in. 3,138
3,138 100.00%
Sub Total (ft) 3,138 0 0 0 0 0 0 0 0 0 0 3,138 100.00%
Polyvinyl
Chloride
(PVCReinforced
Plastic Pipe
(RPM)
21 in.
484
484 100.00%
Sub Total (ft) 0 0 0 0 484 0 0 0 0 0 0 484 100.00%
Unknown
8 in. 55
55 100.00%
Sub Total (ft) 55 0 0 0 0 0 0 0 0 0 0 55 100.00%
Note: So far in 2020, just over 12,000 lineal feet of mains have been rehabilitated or replaced.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
19 Although private property owners own the entire length of the service lateral associated with their property, the City will clear blockages from the property line clean out to the City sewer main (“service the lower lateral”) as a courtesy service to the public; provided a property line cleanout exists and the City is made aware of any problems or backups. Overall lateral maintenance and repair is sole responsibility of property owner.
The City of Santa Clara has been offering inexpensive clean out installations and to date has installed over 9,600 since records have been kept. The sanitary sewer system also includes two large pump stations, each with a flow meter, and five smaller unmetered lift stations. All stations have radio telemetry to monitor operating status.
Pump and Lift Station information is included in the following table:
Table 4-2: Pump & Lift Station Equipment
Station Equipment
Large Pump Stations
Rabello Pump Station
Eight 60 horsepower Flygt 3202 Pumps
600 kW diesel generator
Northside Pump station Four 70 horsepower Flygt 3356 Pumps 350 kW diesel generator
Unmetered Lift
Stations
Tasman Two 10 horsepower Flygt 3127 Pumps
Westside Two 10 horsepower Flygt 3127 Pumps
Primavera Six 10 horsepower
Flygt 3127 pumps,
75 KW Generator
(LPG fuel primary with
natural gas backup)
De La Cruz Two 10 horsepower
Flygt 3127 Pumps,
50KW diesel generator
(Trailer mount)
Stadium Pump Station
6 Flygt Pumps (4 - 15hp model 3153
and 2 - 10hp model 3127), 80 kw diesel
generator
All sewer pumps utilize industry-leading equipment that is not only efficient but features the latest advancements in no-clog impeller designs that are superior to technology used previously. The Utility standardizes pump product lines enabling each station to have a backup pump readily available at the sewer shop. The system also includes over 5,300 manholes, 2 force mains (totaling over 3 miles), 58 siphons, and an additional main line meter station to measure flow at the Guadalupe outfall to the conveyance pipe to the local Treatment Facility; called the Guadalupe metering station.
Previous documentation of the division’s maintenance strategies includes a 2009 Sanitary Sewer Management Plan, adopted by City Council in April 2009, and a 2014 Sanitary Sewer Management Plan, adopted by City Council in February 2014 o.April 720. Both documents provide basic instructions and schedules for inspecting, cleaning, and servicing the City’s sewer system facilities and maintaining records of the work completed. The current organization documented Commented [LT8]: Qualifier not needed and we don’t
have small pump station category so there’s no
differentiation.
Commented [LT9]: Already mentioned in previous
section.
Commented [BM10]: I will reach out to the Clerk’s
office re: how to confirm these dates. There is a way to search for Council meetings prior to the rollout of
Granicus, but I can’t remember it.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
20 here is an update and supersedes the previous SSMPs. The City strives to balance its strong emphasis on customer service with a comprehensive and efficient preventative maintenance program.
4.2 Preventative Operation and Maintenance Activities
Goals of the PreventivePreventative Maintenance Program The main objectives of the preventative maintenance program are to:
• Assure the longest possible lifespanMaximize service life of the City’s sanitary sewer system • Avoid major failures of the system
• Minimize sanitary sewer overflows and backups and
• Respond appropriately to customer concerns and requests.
Major components of the program , in pursuit of these goals, have beenare identified as follows:
• Prioritized cleaning and maintenance of sewer system components • Customer service
• Ongoing condition assessment
• Capital Improvement s Program
• Staff training and providing adequate resources like combination cleaning trucks, CCTV cameras, etc.
• Maintenance of maps of the sanitary sewer system maps, and equipment and supplies inventories
• Use of SCADA systems to monitor and control sewer facilities remotely. • Use of a computerized maintenance management system (CMMS) in combination with CCTV files available on a server for viewing at any time any time.to manage assets and track work orders for scheduled preventivepreventative maintenance and customer requests.
• Previous documentation of the Utility’s maintenance strategies includes a 2009 Sewer System Management Plan, adopted by City Council in April 2009, a 2014 Sewer System Management Plan, adopted by City Council in February 2014, and a 2019 Sewer System Management Plan, adopted by City Council on April 7, 2020. The listed documents provide basic instructions and
REQUIREMENTS
A scheduling system and a data collection system for preventative operation and maintenance activities conducted by staff and contractors.
The scheduling system must include:
(a) Inspection and maintenance activities
(b) Higher-frequency inspections
(c) Maintenance of known problem areas including areas with tree root problems
(d) Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.
The data collection system must document the data from system inspection and maintenance activities, including system areas/components prone to root -intrusion potentially resulting in system backup and/or failure.
Commented [LT11]: Belongs in 4.2
Commented [BM12]: Will need to use either
preventative or preventive. They both mean the same
thing and both are acceptable. I suggest preventative
as it is used most often in utilities. Will need to do a search for both as they are scattered throughout.
Formatted: Not Expanded by / Condensed by
Formatted: Not Highlight
Formatted: Indent: Left: 0.58", No bullets or
numbering
Formatted: Body Text, Indent: Left: 0.42", Right: 0.7", No bullets or numbering, Tab stops: Not at 0.95" +
0.96"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
21 schedules for inspecting, cleaning, and servicing the Utility’s sewer system facilities and maintaining records of the work completed. The current SSMP documented here is an update and supersedes the previous SSMPs. The Utility strives to balance its strong emphasis on customer service with a comprehensive and efficient preventative maintenance program that prevents spills.
Scheduled PreventivePreventative Maintenance
Main Line Maintenance – Cleaning and Repairs
Main Line Maintenance – Cleaning and Repairs
The Assistant Sanitary Sewer Superintendent is responsible for ensuring that tasks are completed in line with the stated goals of the system. Regular review of the data collected and organized with CMMS is a tool for making decisions about redistribution o f tasks and labor, and also to meet the UtilityDivision’s overall goals. The Assistant Sanitary Sewer Superintendent, Engineering Administration, and Asset Management staff responsibilities include the following:
● Planning ● Service Contracts (Engineering)
● Purchasing ● Reporting
● Oversight ● Tailgate Meetings
● Safety Program ● QA/QC Work Orders
Crews are responsible for repairing mainsoperations and maintenance activities as detailed in the following table:
Table 4-13: Crew Responsibilities
Task Description Number of
Staff Required
Jetting/Hydro Flushing 2
Higher Frequency Cleaning (HFC) Inspection and
Cleaning
2-41
Vac-Con (jetting smaller mains) 21
Respond to Service Calls 1-2
Run generators 1
Manhole Inspection/cleaning 21
Manhole repairs 3-41
Inspect and Clean Siphons as Needed 2-31
Repairs (laterals & mains) 3-41
Televise laterals 2 2
Televise Mains 2-41
Saw cuts 2-3
Locate laterals (MetroTech) 2
Cleanout installations 3-4 2
Foaming/ Root Control (mainslaterals) 2
Lift/Pump station preventative maintenance (PM) 1-3
Lift/Pump station major maintenance (MM) 41
Manage work performed by service contracts 1
Write Develop and implement SOPsstandard
operating procedures (SOPs)
1 Develop PM/MM Programs 1
Shop work As needed
Develop PM/MM ProgamsPrograms As needed1
Develop and Implement SOPs 1
Formatted: Normal, Indent: Left: 0.38"
Formatted: Font: Bold
Formatted: Not Highlight
Commented [LT13]: Table title is High Frequency
Cleaning
Formatted: Superscript
Formatted: Superscript
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
22 Manage Work by Service Contracts 1
Tailgate Meetings all
1 May be performed by service contract
2 When requested by customer
An example of a typical weekly calendar of tasks for sanitary sewer crews are depicted in the tables below, with the numbers indicating the number of staff members each task requires:
Commented [LT14]: Duplicate
Formatted: Superscript
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
23 Table 4-24: Example of Crew Weekly Tasks
Monday Tuesday Wednesday Thursday Friday
- Lift Stations –
Pull pumps and do
required
maintenance (3)
- Perform Lateral
Repairs (3)
- Jetting – smaller
streets (2)
- Respond to
Service Calls (2)
- CCTV Mains (2)
- Lift Stations –
Pull pumps and do
required
maintenance (3)
- Perform Lateral
Repairs (3)
- Install cleanouts
(3)
- Jetting – smaller
streets (2)
- Respond to
Service Calls (2)
- CCTV Mains (3)
- Lift Stations –
Pull pumps and do
required
maintenance (3)
- Pumps (1)
- Install cleanouts
(3)
- Jet (2)
- Jetting – smaller
streets (2)
- Respond to
Service Calls (2)
- CCTV Mains (3)
- Pumps and
PreventivePreventative
Maintenance (3)
- Lift Stations – run
generator, trans.
Pumps, work in shop
(2)
- Jetting – larger mains
streets (3)
- Respond to Service
Calls (2)
- CCTV Mains (2)
- Catch up on
assignments as
needed. Off every
other week
- Half crew – cover
assignments as
needed
The Utility’sUtility’s goal is to clean and inspect the entire length of their sewer system within 8 years. This includes replacing deficient mains identified by a PACPthe NASSCO PACP pipe rating system. Regular jetting is scheduled for 36 weeks of the year, which allows time for storm season preparations. HFC’s and siphons, however, are cleaned monthly throughout the year. The current inspection and cleaning cycle began April 2023, and is anticipated to be completed by April 2031.Currently, the City is on schedule to complete full condition assessment of the entire collection system by the end of March 21, 2021. As of December 2019, the City has completed the assessment of over 1.2 million linear feet. The City has also made repairs to over 400 sections of pipe that had a rating of PACP 5.
Cleaning is done systematically by location throughout the City, thereby assuring that all mains are included in each cleaning cycle. Crews begin the cycle at the southern part of the City (higher elevation) and works towards the northern part of the City (lower elevation), progressing through the map books. Condition assessment is performed in conjunction with Repair needs identified during cleaning. CCTV videos and reports are uploaded and stored in the CityUtility’s CMMS. If a defect is observed that may require immediate attention, it is reported to the Assistant Sanitary Sewer Superintendent to assess next steps and whether an emergency repair is warranted. are recorded in the field in the map books, and a work order request is completed in order to facilitate the scheduling of the repairs.
The Crew Supervisor sets priorities for completing repairs, based on the condition of the main and the potential impacts.
Crews are responsible for documenting the work that they complete each day. Th e Utility e Utility utilizes a work orderComputerized Maintenance Management System (CMMS) software system called Lucity which maintains all work completed by maintenance crew staff. The Utility also utilizes an inspection management software called ITpipes to integrate inspection dat a into the CMMS.Lucity is utilized by the Department for its Computerized Maintenance Management System (CMMS).
Routine Main Line Maintenance
The Utility records details of main line maintenance, including date, location, feet, findings, manhole assessment, television work, names of staff completing work, and other comments. An example of a data sheet printout from Lucity can be found in Appendix L.
• Routine Main Line Maintenance – records details of main line maintenance, including date, location, feet, findings, manhole assessment, television work, names of staff completing work, and other comments. An Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Not Highlight
Commented [LT15]: Update based on meeting
discussion.
Formatted: Font: Bold
Formatted: Heading 4, Right: 0", Space Before: 0 pt,
No bullets or numbering, Tab stops: Not at 1.17" +
1.17"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
24 example of a data sheet printout from Lucity can be found in Appendix L.
Areas Needing More Frequent Cleaning (HFC’s or Higher Frequency Cleanings) Areas Needing More Frequent Cleaning (HFC’s or Higher Frequency Cleanings) The DivisionUtility has identified “HFC’s” throughout the City, which are locations in the sewer system that need more frequent cleaning to prevent buildup of grease inside the lines, obstructions, backflow, and SSOspills (Table 4-37). The knowntypicalknown causes for hotspots HFCs include:
● Gravity lines with minimal slope ● Residential FOG
● Commercial FOG ● Root problems
● Surcharging ● Smaller siphons
Some HFC’s remain the same over time, especially flat lines and smaller siphons.
Others are added to and subtractedor removed from the list as problems are resolved and new problems are identified.
HFC’s are identified during routine cleaning and entered into Lucity. Problem areas are noted in the work order system at the time they are identified, and then transferred to the list of HFC’s for further attention. New/recently problematic HFC areas are televised and either cleaned or repaired and assessed as to causality; with any findings noted and left on, or removed fromused to revise the the HFC list based on best management practices.
Crews have a goal of cleaning all HFC’s monthly or as close to 30 days apart as possible. Lucity keeps track of the list as they are cleaned, thereby recording their progress and assuring that all HFC’s are cleaned regularly.
In addition to the smaller siphons that are included on the list of HFC’s, larger siphonsSiphons are inspected regularly and jetted as necessary. A list of siphons is located in Table 4-48.
Formatted: Font: Bold
Formatted: Not Highlight
Commented [LT16]: Table only shows flat slope and
grease as issue.
Formatted: Right: 0.76"
Commented [LT17]: No siphons are on the HFC list.
Revise accordingly.
Formatted: Not Highlight
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
20 Table 4-35: List of High Frequency Cleaning Segments
LOCATION MANHOLES FEET ISSUE SIZE NOTES
Hilmar/Park 28-28/20 186 Flat line/odor 6” Flush
Cypress Alley 5-16/12 9098.9 Flat line/odor 6” Flush
Civic Center/Reeve 46-86/85 343.2 Flat line/odor 6” Flush Monroe/Rip Miller 27-19/10 534 Flat line/odor 6” Flush
BrayJackson 45-86/83,81/850 1177.3 Flat line/odor 6” Flush Sherwood 39-17/27,17,23 3143.9 Flat line/odor 8” Flush
Coleman/Carl 48-22/21 455.4 Flat line/odor 8” Flush
Civic Center/Main 46-87/47-44 2754.6 Flat line/odor 6” Flush Hwy 237/Lafayette 113-2/114-27,20/21 615.5 Flat line/odor 12” Flush Lafayette/Yerba Buena 113-3/114-20/22 63638
7.1 Flat line/odor 12” Flush
GAP/Yerba Buena/Lafayette 103-33/113-2/35 1.1056
57 Flat line/odor 12” Flush
GAP/Yerba Buena-237/Lafayette 103-35/113-2 448.4 Flat line/odor 12” Flush Nelo/Victor 88-23/78-27 404.4 Flat line/odor 12” Inspect flowFlush
Stevens Creek/HP Parking Lot 10-77/80 709.2 Flat line 10” Inspect flow Stevens Creek/HP Parking Lot 10-75/8077 5181,2
27 Flat line 8” Inspect flow
Lawrence/Tracy 11-76/77,78 273.2 Flat line 10” Inspect flow ECR/Jackson/Civic Center 43-93/86 3543.6 Flat line 6” Inspect flow Wood Duck 30-36/21,20,17 556 Flat line 8” Inspect flow
Cabrillo 41-14/18 7421.9 Flat line 8” Inspect flow
Reeve/Jackson 46-85/47-38 3887.9 Flat line 8” Inspect flow Scott/Jay 65-14/11 385 Flat line 12” Inspect flow
Stevens Creek/Woodhams 2-32/27 354 Grease 8” Jet
Calabazas Ct/Via Dondera 32-34/48 6954.5 Grease 6” Jet
ECR/Calabazas 32-4/5 55 Grease 10” Jet
Avenida de Guadalupe 95-3/1 410.9 Grease 8” Jet
Memorex/Richard 56-34/32 386 Grease 12” Jet
Robert/De la Cruz 57-16/58-1719 92103.
9 Grease 10" Jet
Robert/De la Cruz 56-21/17 106 Grease 6” Jet
Richard 56-32/26 220 Grease 10” Jet
Memorex 56-4756-47/56-
/2634
5901,3
18 Grease 10” Jet
Agate/Moraine 53-42/52-16 1,0185
11 Grease 8” Jet
Agate/Mead 52-15/62-5023 60231
2 Grease 10” Jet
Agate/Parkland 53-4/53-2 507 Grease 8” Jet
Mead 62-23/50 2810.8 Grease 10” Jet
Clyde/Orkney 87-25/13 184 Grease 8” Jet
Clyde 86-23/21,18/36 2310.7 Grease 8” Jet
Main/Memorex 46-2/56-47 113.8 Grease 10” Jet
Lehigh 21-75/80 205 Flat line/odor 8” Flush
SC International Swim Center 23-7/24-17 181 Flat line/odor 8” Flush Poplar 28-1/91 361 Flat line/odor 8” Flush
Sherwood/Portola 39-24/27 609 Flat line/odor 8” Flush
Mauricia 13-97/99 257 Flat line 8” Inspect flow
Miles/Saratoga Creek 23-11/12 178 Flat line 8” Inspect flow SC International Swim Center 23-89/5 125 Flat line 8” Inspect flow Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted Table ...
Formatted ...
Formatted ...
Formatted ...
Formatted Table ...
Formatted Table ...
Formatted Table ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted Table ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Formatted ...
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
21 N. Winchester 26-38/32 258 Flat line 10” Inspect flow California 26-39/28 508 Flat line 6” Inspect flow
Moonlite/Bowe 33-22/9 847 Flat line 8” Inspect flow
Kiely/El Sobrante 33-35/34 54 Flat line 15” Inspect flow Chapman 39-1/19 95 Flat line 8” Inspect flow
Main St/UPRR 46-1/56-46 142 Flat line 10” Inspect flow
Jackson 46-93/86 336 Flat line 8” Inspect flow
San Tomas Expwy 55-22/11 551 Flat line 12” Inspect flow Walsh 57-2/3 343 Flat line 15” Inspect flow
Mathew 57-38/35 208 Flat line 18” Inspect flow
Mathew 57-38/58 344 Flat line 24” Inspect flow
Central/Lafayette 66-40/38 546 Flat line 12” Inspect flow Central/Lafayette 66-41/40 546 Flat line 10” Inspect flow Los Olivos 25-82/74 378 Grease 8” Jet
Cheeney 85-17/30 435 Grease 6” Jet
Clyde 86-18/36 66 Grease 8” Jet
Clyde 86-23/21 134 Grease 8” Jet
Clyde/Montaguea 87-25/13 184 Grease 10” Jet
Avenida de Guadalupe 95-3/1 41 Grease 8” Jet
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
22 Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
23 Table 4-4: Siphons to be Inspected and Jetted as Necessary Table 4-6: Siphons to be Inspected and Jetted as Necessary
BB Page Location MH From/To Size and Material
1 14 222 Saratoga Ave. & San Tomas Expwy 14-61/62 10" VCP 2 14/15 Saratoga Ave. & Sutter Ave. 14-65/15-62 10” VCP 3 20 3800-3750 Homestead Rd. & Calabazas
Creek
20-26/18 24" PE
4 20 3800-3750 Homestead Rd. & Calabazas
Creek
20-26/18 24" PE
5 20 3800-3750 Homestead Rd. & Calabazas
Creek
20-16/17 16" PE
6 22 2960 Homestead Rd. & Saratoga Creek 22-64/102 8" CIP 7 23 830-900 Kiely Blvd. near Saratoga Creek 23-15/14 8" VCP 8 23 830-900 Kiely Blvd. near Saratoga Creek 23-15/14 12” VCP 9 31 3770 Flora Vista Dr. & Calabazas Creek 31-24/25 24" DIP 10 32 South Side El Camino Real & Calabazas
Creek
32-2/102 8” PVC
11 32 South Side El Camino Real & Calabazas
Creek
32-2/102 10” PVC
12 33 2570 El Camino Real & Calabazas Creek 33-9/10 8" CIP 13 42 3205 Cabrillo Ave. & Calabazas Creek 42-30/31 6" CIP 14 46 Cabrillo Ave. & Main St. 46-114/115 6” PE
15 46 Cabrillo Ave. & Main St. 46-114/115 6” PE
1614 52 3250 Monroe St. & Calabazas Creek 52-123/124 8" HDPE 1715 52 3250 Monroe St. & Calabazas Creek 52-123/124 8" HDPE 1817 52 3289 Agate Dr. & Calabazas Creek 52-3/5 8" CIP
1918 52 2168 Calabazas Blvd.Machado Ave. &
Calabazas Creek
52-116/119 12" HDPE
2019 52 Machado Ave. & Calabazas Creek2168
Calabazas Blvd. & Calabazas Creek
52-116/119 12" HDPE
2120 54 21499 Hoover Dr. & Saratoga Creek 54-79/78 10" VCP 2221 54 21499 Hoover Dr. & Saratoga Creek 54-79/78 10" VCP 2322 54 2400 Walsh & San Tomas Aquino Creek 54-94/95 18" HDPE 2423 54 2400 Walsh & San Tomas Aquino Creek 54-94/95 18" HDPE 2524 55 2001 Walsh Ave. & Scott Blvd. 55-51/52 20" HDPE 2625 55 2001 Walsh Ave. & Scott Blvd. 55-51/52 20" HDPE 2726 56 982 Walsh Ave. & Lafayette St. 56-58/59 20" HDPE 2827 56 982 Walsh Ave. & Lafayette St. 56-58/59 20" HDPE 2928 62 Central Expwy & Calabazas Creek 62-9/10 16" DIP 3028 62 Central Expwy & Calabazas Creek 62-7/12 8" VCP
3129 62 Central Expwy & Calabazas Creek 62-7/12 10” VCP 3230 64 24001 Walsh Ave. & San Tomas Aquino
Creek
64-34/36 15" VCP
Formatted: Not Highlight
Formatted: Centered, Indent: Left: 1.5", Right: 1.63" Formatted: Normal, Indent: Left: 0", Space Before: 0
pt, After: 0 pt
Formatted Table
Formatted: Centered
Formatted: Not Highlight
Formatted: Not Highlight
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
24 3331 64 24001 Walsh Ave. & San Tomas Aquino
Creek
64-34/36 8" VCP
3432 67 De la Cruz Blvd. & Central Expwy. 67-21/29 24” DIP 3533 67 De la Cruz Blvd. & Central Expwy. 67-21/29 24” DIP 3634 68 Seaboard Ave. & Guadalupe River 68-10/7 2433" RCP VCP 37 68 Seaboard Ave. & Guadalupe River 68-10/7 15" RCP
38 68 Seaboard Ave. & Guadalupe River 68-9/6 24” VCP
39 68 Seaboard Ave. & Guadalupe River 68-9/6 15” VCP
4035 68 Airport Property & Hwy 101 68-15/16 24" CIPP
4136 68 Airport Property & Hwy 101 68-15/12 24" DIP
37 68 Guadalupe River Chart Station 68-9/6 24” VCP
38 68 Guadalupe River Chart Station 68-9/6 15” VCP
4239 72 East Side Calabazas Creek Near Tannery
Way
72-12/11 20” CIP
4340 72 East Side Calabazas Creek Near Tannery
Way
72-12/11 20” CIP
4441 85 2250 Agnew Rd. & Lakeshore Dr. 85-86/85 16” PE
4542 93 Old Glory Ln. & Great America Pkwy. 93-50/48 12" VCP 4643 93 Old Glory Ln. & Great America Pkwy. 93-50/48 24" VCP 4744 93 Old Glory Ln. & Great America Pkwy. 93-51/49 18" VCP 4845 93 Old Glory Ln. & Great America Pkwy. 93-51/49 24" VCP 4946 93 Old Glory Ln. & Great America Pkwy. 93-51/49 24" VCP 50474849 95 Lafayette St. & San Francisco Hetch-
Hetchy Potable Water Main Right of Way
95-45/44 15” VCP
5150 95 Lafayette St. & San Francisco Hetch-
Hetchy Potable Water Main Right of Way
95-45/44 18” VCP
5251 95 Lafayette St. & San Francisco Hetch-
Hetchy Potable Water Main Right of Way
95-45/44 18” VCP
5352 96 4750 Lick Mill Blvd. & Hetch Hetchy R/W 96-14/13 15" PE 5453 96 4750 Lick Mill Blvd. & Hetch Hetchy R/W 96-14/13 10" PE 5554 103 5300 Great America Pkwy & San Tomas
Aquino Creek
103-19/16 24” VCP
5655 103 5300 Great America Pkwy & San Tomas
Aquino Creek
103-19/16 12” VCP
5756 103 Great America Pkwy. & San Tomas
Aquino Creek
103-20/18 18" VCP
5857 103 Great America Pkwy. & San Tomas
Aquino Creek
103-20/18 24" VCP
5958 103 Great America Pkwy. & San Tomas
Aquino Creek
103-20/18 24" VCP
Formatted: Not Highlight
Formatted: Left
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
25 Formatted: Normal, Indent: Left: 0", Space Before: 0 pt, After: 0 pt
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
26 Pump Station Maintenance
Pump Station Maintenance
The UtilityUtility divides pump and lift station maintenance into two categories: routine preventivepreventative maintenance and major maintenance. Currently, sanitary sewer crews are responsible for completing both routine and major maintenance activities.
Table 4-57: Pump Station Inspection and Maintenance Schedule Large Pump Stations: Northside and
Rabello
Unmetered Lift Stations: Tasman, De
La Cruz, Primavera, Westside &
Stadium Pump Station
Generators
Routine Inspection &
PreventivePreventative
Maintenance
Major
Maintenance
Routine Inspection &
PreventivePreventative
Maintenance
Major
Maintenance
Routine
PreventivePreventative
Maintenance
Monthly
Check pump flow
Submerged hardware
Check valve operation at
Rabello
Site Inspections:
Note total flow readings,
electric meter readings,
pump hours & any
pumps out of service
Check screen at
Northside and check as
needed
Degrease wet well,
pump down, then wash
down normally
Wear rings;
inspect
clearance
Submerged hardware
Note hour meter totals
as applicable
Degrease wet well,
pump down, then wash
down normally
Clean wet
well
Inspect for leaks
Make sure that block
heaters are operational
Measure fuel levels and
refill as necessary
Run under load for 1
hour to assure reliability
Quarterly
Amp out all pumps for
efficiency
Inspect
impellers for
wear
Amp out all pumps for
efficiency
Inspect
impellers for
wear
Formatted: Font: Bold
Formatted: Indent: Left: 0"
Formatted: Not Highlight
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
27 Replace oil in
pumps with
new seals
Check oil
reservoir on
pumps and
remove rags
Inspect flaps
or check
valve for
wear and
debris
Inspect pumps and
check valve operation
Make sure that all
pumps are alternating
and working properly
Inspect wear
rings and oil
chamber on
submersible
pumps
Check oil
reservoir on
pumps and
remove rags
Annually
Calibrate flow meters
Maintain the Motor
Control Center (MCC)
Maintain the Motor
Control Center (MCC)
Formatted: Indent: Left: 0"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
28 However, thetThe UtilityUtility also currently holds a contract with a private company to perform major pump maintenance. or repairs due to the expertise and resources needed. Contracting major pump maintenance activities allows the Utility to focus more of its resources on the preventative maintenance program throughout the sewer system.
Root Control
Root Control
AFollowing cleaning, or as a part of a customer service request, the UtilityUtility may treat s laterals and smaller mains for root control by means of physical removal or using a foam product.
The Utility may offer treatment for root controls to private sewer laterals as a courtesy when requested by a resident or when necessary, as pre-treatment to provide inspection services.
There is no official program to provide this service, and this service is offered on an as- requested basis only. Crew A is responsible for foaming laterals.
The current protocol includes cutting the roots and removing them from the sewer, waiting four (4) to six (6) weeks, foaming, and then going back to double check the affected segment of pipe.
Manhole Inspection and Repairs
Manhole Inspection and Repairs
Crew B is responsible for inspecting and cleaning manholes. Manholes are inspected as mains are jetted. In this way, all manholes are inspected approximately once every threethree (3)eight (8) years during the completion of system-wide CCTV. Any needed repairs are identified and documented in the block book by the Crew Supervisor. Repair needs are transferred to and completed by Crew A orSewer Division staff or may be contracted to a private company.
Manhole inspections and cleaning are documented along with other task completion on the daily report form.
Rehabilitation and Replacement Plan
Rehabilitation and Replacement Plan
In addition to visual inspections of manholes and identification of abnormal conditions in sewers mains during routine cleaning, it has been the practice of the Sewer Division to perform closed- circuit television (CCTV) inspections (also known as television, TV, or video inspections), as necessary to investigate problem areas in sewer mains or laterals. The Division has also developed a routine CCTV inspection and condition assessment program for laterals and main lines. The City owns a CCTV truckthat went into service in 2015 and is operated by City staff.
CCTV inspections are also completed as necessary to ensure that new construction meets the City’s design standards. All related findings, videos, and information about condition assessment is kept in our CMMS on-site.Observations from system-wide CCTV are reviewed by Sewer Division staff and coordinated with the Utility’s Engineering Division to prioritize rehabilitation and replacement. Severity of observed defects, location of pipe, proximity to other repair candidates, age, size, and material of pipe are considered and used to advise capital project planning.
Capital Improvement Program / Major Repairs
The Public Works’ Engineering Department is responsible for managing the Public Works’ portion of the City’s Capital Improvements Program, which includes Sewer Division capital improvement projects.
If major deficiencies warranting rehabilitation or replacement of sewer system components are identified as a result of routine main-line cleaning or CCTV inspections that require resources beyond those available to the Division, the Assistant Sanitary Sew er Superintendent contacts the Principal Engineer – Water and Sewer. Principal Engineer then prioritize and coordinates with Commented [LT18]: Not really true. We just don’t
have the expertise needed.
Formatted: Font: Bold
Commented [LT19]: Who is Crew A and B?. Remove
or add definition.
Formatted: Font: Bold
Formatted: Not Highlight
Formatted: Font: Bold
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
29 Public Works Design Division for contracting the sewer main repair activities.
The City completed a Sewer System Capacity Assessment in 200 7 and a General Plan Update in 2010 for new planned development and redevelopment. An update to the Sewer System Capacity Assessment was completed in 2016. Several capacity-related capital improvement projects were identified as a result of this assessment and have since been incorporated into the City’s Capital Improvement Program. The current schedule for these projects is shown in Table 4- 10 on the following page. Sewer Revenue from rates will be used to fund these projects.
Commented [MD20]: Need to update with most recent
TMs
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
30 Table 4-8: Sanitary Sewer Capacity Improvement ProjectsTable 4-8: Sanitary Sewer Capacity Improvement Projects
Customer Service
Customer Service
The City’s website, www.santaclaraca.gov, provides details about how the CityUtility serves its customers and encourages residents to call the UtilityUtility regarding sewer problems.
Crew B isSewer Division staff responsible for handling service requests during business hours. After hours service calls are received by the City’s Water/Electric Control Operators, which are staffed 24 hours a day, seven days a week. Additional information about after -hours emergency response is contained in the Emergency Response Plan.
Crew ASewer Division staff are is also responsible for installing cleanouts on an as-requested basis. Cleanout installations are generally completed as scheduled, but dependent on current Formatted: Not Highlight
Formatted: Normal, Centered, Indent: Left: 0", Space
Before: 0 pt, After: 0 pt
Formatted: Normal, Space Before: 0 pt
Formatted: Font: Bold
Commented [LT21]: See previous comment
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
31 workload.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
32 4.3 Training
Staff Training on O&M
Current Training Practices and Requirements
Current training practices focus on hands-on, in-the-field experience. New staff are paired with more experienced crews. The Assistant Sanitary Sewer Superintendent is responsible for scheduling staff to assure that new staff receives the training they nee d on all required tasks.
Crew Supervisors conduct performance appraisals once every three months for the first year of employment, and once a year in subsequent years, for each employee. The crew supervisor submits appraisal information to upper-level management for review.
All Water and Sewer DivisionSewer Division staff must obtain a State Water Resources Control Board Drinking Water Operator Certification Program Grade 1 Water Distribution certification. In order to be promoted from a Maintenance Worker I to a Maintenance Worker II position, staff must advance to at least Grade 2 of the DDW SWRCB Water Distribution certification and must also obtain at least a CWEA Grade 1 collection system certification.
The DivisionStaff holds daily tailgate safety meetings to review safety concerns and procedures .
A representative from each Division under the Water, Sewer, and Solar Utility . The DivisionStaff also holds a monthly safety meeting that is attended by representatives from all staff levels to discuss safety procedures on a departmental level. also participates in a monthly safety meeting. The Water and Sewer Operations Manager also attends a monthly CityUtility-wide safety meeting. The Director, Assistant Director and/or Compliance Manager reviews all accidents.
Equipment operators Operators must be properly licensed according to State laws. The following vehicles require that operators have a class A or B California commercial driver’s license:
• Vacuum Excavation Truck-con • Crane truck
• Jet truck • Service Truck
• Dump truck • Tanker
Staff are required to obtain the appropriate license within one year of employment.
All Department Engineers, the Utility Business Systems Manager, and Sanitary Sewer staff, including Pump Technicians and Utility Crew Supervisors are all certified in NASSCO PACP.in the Pipeline Assessment Certification Program (PACP) through the National Association of Sewer Service Companies (NASSCO).
Training Opportunities
Sewer Division management and maintenance staff attend appropriate training events offered by CWEA and other organizations as opportunities arise.
REQUIREMENTS
A scheduling system and a data collection system for preventative operation and maintenance activities conducted by staff and contractors.
The scheduling system must include:
(e) Inspection and maintenance activities
(f) Higher-frequency inspections
(g) Maintenance of known problem areas including areas with tree root problems
(h) Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.
The data collection system must document the data from system inspection and maintenance activities, including system areas/components prone to root -intrusion potentially resulting in system backup and/or failure.In-house external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors.
The training must cover the requirements of this General Order; the Enrollee’s Spill Emergency Response Plan procedures and practice drills, skilled estimation of spill volume for field operators, and electronic CIWQS reporting procedures for staff submitting data.
Commented [BM22]: Department? Or are we trying to
communicate that all field staff are required to get this, b/c I’m not sure that’s the case.
Formatted: Font: Arial
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
33 Developing Training Materials
NThe Sewer Division is exploring options for developing more formal training materials. The Division is planning to develop a library of training videos such that each SOP will have a video resource that accompanies it. Resource manuals have been compiled by the Sew er Pump Tech that outline various specifications on our equipment, typical settings, desired operations, and troubleshooting of stations. Training is ongoing with our CMMS (Lucity) to keep all vital information in the cloud/electronic tablet for instantaneous access to key system, site and procedural information.
The Sewer Division is exploring options for developing more formal training materials. The Division is planning to develop a library of training videos such that each SOP will have a video resource that accompanies it. Resource manuals have been compiled by the Sewer Pump Tech that outline various specifications on our equipment, typical settings, desired operations, and troubleshooting of stations. Training is ongoing with our CMMS (Lucity) to keep all vital informat ion in the cloud/electronic tablet for instantaneous access to key system, site and procedural information.
4.4 Equipment Inventory
Equipment and Parts Inventory
The City of Santa Clara’s Automotive Services Department is responsible for maintaining all the City’s vehicles. The Sewer Utility’s vehicle costs are amortized over the fiscal year. The Assistant Sanitary Sewer Superintendent is responsible for purchasing other equipment and spare parts to support this equipment. Pipe materials are purchased and stocked by the City’s Finance Department’s Purchasing Division, according to a minimum quantity list.
A current inventory of vehicles, s and major equipment, critical spare parts and the minimum quantity list , which is a more complete inventory, is attached as Appendix E.
REQUIREMENTS
In-house external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors.
The training must cover the requirements of this General Order; the Enrollee’s Spill Emergency Response Plan procedures and practice drills, skilled estimation of spill volume for field operators, and electronic CIWQS reporting procedures for staff submitting data.An inventory of sewer system equipment, including the identification of critical replacement and spare parts.
Commented [LT23]: Confirm please. Not sure how its
amortized over the fiscal year. Equipment and vehicle
costs are generally fully due upon delivery.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
34 ELEMENT 5: DESIGN & PERFORMANCE PROVISIONS
5.1 Updated Design Criteria and Construction Standards
Discussion of Design and Performance Provisions
Maintaining detailed design standards assures that new construction, replacement and rehabilitation work on the CityUtility’s sanitary sewer system maintains the most up to date and relevant engineering standards. Providing these standards to consulting engineers and developers ensures compatibility with the existing system and a long system life with minimum operational cost.
All new sanitary sewer construction projects shall use the City’s most recent design standards at a minimum. These standards are to be provided to consulting engineers that are planning a development or providing services for CityUtility owned sanitary sewer construction projects.
All rehabilitated sanitary sewer construction projects also must use the City’s most recent design standards as a minimum. These standards must to be provided to consulting engineers that are planning rehabilitation services for the CityUtility owned sanitary sewer system.
Repairs to the sanitary sewer system shall comply with the most current design standards.
Repairs to existing systems shall be made utilizing the most current and acceptable practices.
All major repairs shall be made under the direction of the Director of Water and Sewer Utilities or their designee.
The current construction design standards are maintained by the City Engineer. A copy of the current Standard for Sanitary Sewer Design Criteria is attached as Appendix F. The City is planning on a near-term effort to review and update design criteria in the future.
5.2 Procedures and Standards
REQUIREMENTS
The Plan must include the items listed below that are appropriate and applicable to the Enrollee’s system.
An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.must include the following items as appropriate and applicable to the Enrollee’s system.
Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include componen t-specific evaluation of the design criteria.
Requirement:
(a) Design and construction standards and specifications for the installation of new sanitary sewer systems, pump stations and other appurtenances; and for the rehabilitation and repair of existing sanitary sewer systems; and
(b) Procedures and standards for inspecting and testing the installation of new sewers, pumps, and other appurtenances and for rehabilitation and repair projects.
Formatted: Indent: Left: 0"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
35 Inspection and
Testing New Construction
There are standards for the inspection and testing of the sanitary sewer system after construction, rehabilitation or repair. The City Public Works Department’s City Engineer prepares City Standard Details for the sanitary sewer system. Additionally, new sewer lateral and facilities are inspected by the City Building Department. Copies of these standards are available for purchase at the City of Santa Clara Inspection counter in City Hall and are attached in Appendix G.
REQUIREMENTS
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.
Formatted: Font: 14 pt
Formatted: Indent: Left: 0.15", Right: 0.28", Space
Before: 4.65 pt
Formatted: Body Text, Indent: Left: 0"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
36 ELEMENT 6: OVERFLOW SPILL EMERGENCY
RESPONSE PLAN
Emergency Response Procedures
Emergency Response Procedures
Spill Emergency Response Procedures
These procedures are described by the following operating procedures, flowcharts and tables and contact lists, which are included as part of this Spill Emergency Response Plan located in Appendix H:
• Receiving a Service Request and Response During Business Hours; • Receiving a Service Request and Response After Business Hours, Weekends and Holidays;
• Sanitary Sewer Overflow Response SOP;
• Jet Truck Operations SOP
The collection system agency shall develop and implement an overflow emergency response plan that identifies measures to protect public health and the environment. At a minimum, this plan must include the following:Plan must include an up-to-date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to meet all the following.
(a) Proper notification procedures so that the primary responders and regulatory agencies are informed of all SSOs in a timely manner;Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner.
(b) Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) A program to ensure appropriate response to all overflows; (b) Procedures to ensure prompt notification to appropriate regulatory agencies and other potentially affected entities (e.g. health agencies, regional water boards, water suppliers, etc.) of all spillsSSOs that potentially affect public health or reach the waters of the State.
(c) Comply with the notification, monitoring and reporting requirements of this General Order, in accordance with the Monitoring and Reporting Program (MRP).
All SSOs shall be reported in accordance with this MRP, the California Water Code, other State lLaw and regulations, and other applicable Regional Water Board Orders. Waste Discharge Requirements or National Pollutant Discharge Elimination System (NPDES) permit requirements. The Sewer System Management Plan should identify the officials who will receive i mmediate notification;
(d) EProcedures to ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained. personnel are aware of and follow the Emergency Response Plan and are appropriately trained; Proper identification procedures so that primary responders and regulatory agencies are informed of all SSOs in a timely manner;
(d) A
(e) Procedures to address emergency system operations, such as traffic and crowd control and other necessary response activities.; and (f) A program to ensure that all reasonable steps are taken toC contain a spilluntreated wastewater and prevent/minimize discharge of untreated wastewater to Waters of the United the States and minimize or correct any adverse impact on the environment resulting from the SSOs, including such accelerated or additional monitoring as may be necessary to determine the nature and impact of the discharge.
(f) This Emergency Response Plan has been compiled to address the requirements of the State Water Board Order No. 2006-0003-DWQor any drainage conveyance system.
(g) Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State.
(h) Remove sewage from the drainage conveyance system.
(i) Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters. (j) Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery.
(k) Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event.
(l) Conduct post-spill assessments of spill response activities. (m) Document and report spill events as required in this General Order. (n) Annually review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.
Formatted: Indent: First line: 0", Right: 0.53", Space Before: 0.05 pt
Formatted: Indent: First line: 0", Right: 0.29",
Numbered + Level: 1 + Numbering Style: a, b, c, … +
Start at: 1 + Alignment: Left + Aligned at: 0.39" +
Indent at: 0.6", Tab stops: 0.77", Left
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
37 • Vac-Con Operations SOP
• Sanitary Sewer Overflow (Spill Notification, Monitoring, Reporting and Recordkeeping)
• Spill Emergency Response Plan Report:
o Section 1 - General Information/Background
o Section 2 - Estimated and Calculated Spill Amounts
o Section 3 - Spill Cause Source and Destination
o Section 4 - Incident Response and Notification
o Section 5 - Additional Spill Calculation and Estimation Information o Section 6 - Photograph Checklist
• Additional Support for Emergency Operations;
• Sanitary Sewer Overflow Water Quality Sampling SOP
Receiving and Responding to a Service Request
The City of Santa Clara’s website instructs customers to call the Sewer Division staff directly during business hours at 408-615-2000 to report sewer-related problems. Work orders are created to track reported sewer-related issues and a During business hours, one Maintenance Worker is dispatched to perform the initial evaluations of investigate the problem and resolve it if possible. Additional crew members are called in if necessary.
Customers are instructed to call 408-615-5640 on weekends, holidays and after business hours. These after-hours calls are received by the Water/Electric Ccontrol Operators. Sewer Division staff and qualified Water Division staff may choose to be on- call to respond to after- hours service calls. The Water/Electric Control Operators maintain a list of these on -call crew members.ssupport the Utility's staff as needed for serviceStaff has working relationships with multiple local vendors.
The following procedure has been established for responding to a customer service request for a backup:
• First Responder: The Utility sends out one person to check the public main and the lower lateral (if there is an existing property line cleanout) to determine if there is a stoppage in the Utility-owned system, or if the stoppage is in the customer- owned lateral. The first responder then meets with the customer to discuss the location of the problem.
• If the stoppage is determined to be in the lower lateral of the customer’s lateral, Sewer Division staff will run a drain auger into the public main in an attempt to clear the blockage. Staff may also elect to plunge the blockage if it is deemed risky to insert the drain auger. For other types of problems, or items relating to blockages in the upper portion of the lateral, the first responder will advise the customer of appropriate actions to take.
• If the stoppage is determined to be in the main line, the first responder will call in a jet truck and crew to relieve the problem. After clearing the stoppage, the line will be assessed and scheduled for further work if necessary. A CCTV inspection will b e completed if the stoppage was particularly problematic, or if the inspection is deemed useful for other reasons.
• If the crew cannot clear the stoppage, the line will be repaired. If a problem is found that requires repairs, the Assistant Sanitary Sewer Superintendent will be notified and will call USA. The Crew Supervisor will mark the work area and will get his crew to saw out, excavate, complete the repair, backfill and clean up. • In addition, the crew will also perform repairs to manholes that were either damaged during the process of clearing the stoppage or if any prior deficiencies were discovered.
Commented [LT24]: SSO Response Plan references
Jet Truck and Vac Con SOP but I don’t see it in the
appendix. Add SOP
Formatted: Indent: Left: 0"
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Commented [LT25]: Not clear what this is to convey.
Formatted: Bulleted + Level: 1 + Aligned at: 0.67" +
Indent at: 0.92"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
38 A Sewer/Water Division employee is immediately notified when a spill occurs. After business hours, upon becoming aware of a spill (either through the initial service call or by notification from other sources), the Water/Electric Operators call Sewer and W ater Division Maintenance Workers and supervisory staff, working their way up the chain-of-command, until a City employee is reached. Utility workers try to respond to service calls within 30 minutes. The private contractor will be instructed to contact the Operators immediately upon becoming aware of a spill.
Program to Ensure an Appropriate Response in all Overflows
Responding to a Service Request
During business hours, the first Responder calls the Crew Supervisor or Assistant Sanitary Sewer Superintendent if additional staff or equipment is needed to assist with response. Each Sewer Division truck is equipped with a radio. After business hours, th e first Responder calls the Water/Electric control Operators if additional staff or equipment are needed to assist with response. The Operators then call in other staff.
The Sewer Division maintains a spill-response truck/trailer with appropriate equipment and materials. First Responders may call for the truck/trailer to the service request location.
Additional equipment is called in as needed for larger spills. • A binder containing all Sewer Division SOPs, and a packet of additional spill reference and documentation material are included in the truck/trailer. Also, included in the Emergency Response Procedures in Appendix H, is the: S pill Response SOP:
Spill Sampling SOP; Jet Truck Operations SOP; and Vac-Con Operations SOP.
Notification of Cal OES, Valley Water, Santa Clara County Health, City of Santa Clara Public Works of spills that potentially affect public health or reach waters of the State
Sewer Division staff has been trained on the updated Spill Emergency Response Plan Report that includes notification information and procedures on when to contact Cal OES. Addition support contact information has been provided for reference to staff for the Valley Water, County Health Officer, City of Santa Clara Public Works.
The Water and Sewer Operations Manager, Water and Sewer Superintendent, Assistant Water and Sanitary Sewer Superintendent and any registered Data Submitters (DS) is responsible for entering reports of spills into the California Integrated Water Quality System (CIWQS), as required by the Monitoring and Reporting Program in the State Water Board Order No. 2022-0103-DWQ. The Water and Sewer Operations Manager and the Water and Sewer Superintendent are responsible for certifying spill reports to CIWQS. Two-hour notifications, as required, may be made by the LRO, and in the event of their absence, notification may be made by the Assistant Water & Sanitary Superintendent, Assistant Director, or Director. The Assistant Director and Director is also responsible for completing the SSMP Audit Report every two years. The updated Spill Notification and Reporting Flow charts are included with updated Appendix H and attached to this document; the Organizational Structure is referenced in Element 2 as Figure 2-1.
Notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders
The Utility has updated its Spill Notification, Monitoring, Reporting and Recordkeeping and processes to include requirements of Attachment E1 Notification, Monitoring, Reporting and Recordkeeping Requirements of the new Order. The updated processes are inclusive of the spill categories listed below:
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Formatted: Font: Italic
Formatted: Bulleted + Level: 1 + Aligned at: 0.67" +
Indent at: 0.92"
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Commented [LT26]: Previous references are assistant
sanitary sewer superintendent
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
39 • Category 1- discharges any volume of sewage of any volume that reaches surface water or drainage channel; reaches the Storm drain system not fully captured; • Category 2 – Discharges of untreated or partially treated wastewater of 1,000 gallons or greater that does not discharge to a surface waters; • Category 3 – Spill equal to or greater than 50 gallons and less than 1,000 gallons that does not discharge to surface waters;
• Category 4- Spill less than 50 gallons;
• Reporting private lateral discharges is encouraged but not required by the new Order, The Utility will assess the need for reporting private sewer lateral spills to regulatory agencies on a case-by-case basis.
Spill Emergency Response Training
Sewer Division staff has been trained at two training sessions provided by the Utility on the new Spill Emergency Response Plan to address requirements of the State Water Board Order No. 2022-0103-DWQ. The training occurred May 4, 2023, and June 1, 2023, before implementation of the 2022 -0103-DWQ Order that became effective on June 5, 2023.
Training on the Spill Response Plan will occur on at least a semi -annual basis. There were also a number of coordination meetings between managers and supervisors on April 19th, May 3rd, May 9th, and May 25th and June 5th. Ongoing coordination meetings between managers and supervisors will occur on an as-needed basis when updates are needs to Element 6 and Appendix H: Emergency Response Procedures. All contractors involved in responding to spills will also be trained on the Spill Emergency Response Plan.
Pre-planned coordination and collaboration with the City’s Public Works Department that manages the storm drain system or Municipal Separate Storm Sewer System (MS4) and other utility agencies/departments prior, during, and after a spill event.
The Water and Sewer Utilities meets on an as-needed basis with the Public Works Department to ensure adequate response to various emergencies that occur in the City. The Water and Sewer Utilities and the Public Works Department met on May 11, 2023, to coordinate efforts related to the new Order. Practices and procedures discussed at this meeting were incorporated into the Spill Emergency Response Plan.
Roles and Responsibilities coordinated between the two Departments were designated as follows:
Water & Sewer Utilities
• First responders, implement procedures contained in the Utility’s Sewer System Management Plan (SSMP) and Spill Emergency Response Plan to stop/mitigate sewer overflows
• State CalOES Notification when required
• State CIWQS Reporting
• Removing blockage in the sanitary sewer system
• Water Quality Sampling when required
• Clean-up overflowed sewage
Department of Public Works-Stormwater Division
All spill categories have the potential to impact storm conveyance • Respond to location where overflow enters storm drain system • Assist with identifying if storm conveyance including catch basins, stormwater green infrastructure BMPs (bioretention, infiltration basins, bioswales) will discharge to surface water (creek/river), pump station/retention basin Formatted: Bulleted + Level: 1 + Aligned at: 0.67" +
Indent at: 0.92"
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Formatted: Underline
Formatted: Bulleted + Level: 1 + Aligned at: 0.67" +
Indent at: 0.92"
Formatted: Underline
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
40 • Coordinate shutoff of storm pump/lift station to prevent from discharging to surface water
• Assist with creek access for Water & Sewer Utilities-Compliance staff to complete investigation and take photos at outfall, upstream, downstream, and Water Quality sampling if necessary
• Assist with clean-up effort of storm drain system
The contact list for Stormwater Division staff was updated to the Additional Support for Emergency Operations form.
Conduct post-spill assessments of spill response activities
Management and supervisory staff that could include the Compliance Manager, Water and Sewer Operations Manager, Water and Sewer Superintendent, Assistant Water and Sanitary Sewer Superintendent including the Assistant Director and Director of Water and Sew er Utilities will conduct post-spill assessments to discuss response activities, equipment, and infrastructure deficiencies
Documentation and reporting all spill events categories
Water and Sewer Utilities staff will document and report spills for Categories 1, 2,3,4 as outlined in Attachment E1 of the Statewide Sanitary Sewer Systems General Order 2022 - 0103-DWQ. Utility staff will document spill responses on the Spill Emergency Response Report forms that are utilized in the field. Pertinent information is documented in the Computer Maintenance Management System (CMMS) utilizing Lucity database software. The Utility will update spill related information in the CIWQS database accordin g to the requirements of the Order.
Annually, review and assess effectiveness of the Spill Emergency Response Plan
On an annual basis the Utility’s management and supervisory staff will meet annually and review the Spill Response Plan with a focus on spill response and containment, documentation procedures, training requirements, communication, CIWQS reporting and coordination between agencies including the Public Works stormwater Division. Any outcomes from the annual evaluation will be documented and implemented with modification being made to the Spill Emergency Response Plan.
Lateral Responsibility
Property owners own the entire length of their laterals. Property owners are responsible for dealing with blockages and backups resulting from blockages in their lateral. Utility employees do not work on the customer’s upper lateral under any circumstances. If there is a blockage in a lateral and there is not an existing property line cleanout, the property owner is responsible for dealing with the blockage and backup. The Utility is not responsible for damages due to blockages in these laterals. Utility employees will check the lower lateral and will attempt to clear blockages as a courtesy service, provided that there is a property line cleanout.
Sewer Division staff will explain this policy to the customer and offer to schedule a property line cleanout installation so that future backups caused by problems in the lower lateral couldan be more easily identified and resolved.
In Chapter 13.10 of the Santa Clara Municipal Code under 13.10.020 Definitions (S) (5) sewer Formatted: Bulleted + Level: 1 + Aligned at: 0.67" +
Indent at: 0.92"
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Formatted: Heading 4, Indent: Left: 0", Right: 0",
Space Before: 10.1 pt
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
41 lateral is defined included entity that owns the lateral:
“Sewer lateral” (same as “sewer service lateral”) means the sewer connection piping used to convey sewage from a building or facility on a parcel (private or public property) to the City - owned sewer main. Each sewer lateral is owned by the entity that owns the property or facility from which that sewer lateral serves to convey sewage.”
Under 13.10.040 - Maintenance and inspection of sewer connections defines the requirements:
“Each user shall keep his/her sewer connections and sewer lateral(s) in good order at his/her own expense and shall be liable for all damages resulting from failure to do so. Each owner shall maintain their sewer lateral free from displaced joints, open jo ints, root intrusions, substantial deterioration of pipe material, cracks, leaks, inflow or infiltration of extraneous water, grease and sediment deposits or other similar conditions, defects, or obstructions likely to cause or increase the chance of blockage. A City inspector shall be admitted at all reasonable hours to any premises connected with the sewer system, for the purpose of checking plumbing fixtures, protecting the rights of the City, and determining facts relevant to the establishment, computation, and billing of the sewer service charges provided for in this chapter, including, in the case of industrial users, examination of the users’ books for the purpose of checking the quantities of industrial waste produced. “
The Utility will on a case-by-case basis determine whether to report sewer discharges to California Office of Emergency Services (OES) from Privately-Owned Sewer Laterals and or Private Sanitary Sewer Systems that discharges to waters of the State, or a storm drain conveyance system that discharges to the waters of the State. The City may notify California Office of Emergency Services (OES) for spills from private laterals on a case by case basis.
Table 6-1: Officials Receiving Immediate Notification of Spill’s (Spills resulting from a problem with a main line)
Contact Circumstances for Immediate Notification
Operations Manager /
Assistant Superintendent/
Water and Sewer
Compliance Manager
If the spill reaches surface water, indicating if water quality samples need to be taken.
Public Works/ Operations &
Maintenance Division/storm
drain and street
maintenance sub-divisions
If the spill enters the storm system.
Office of Emergency
Services
For all spills greater than 1,000 gallons reaching surface waters or spilled in a location where it probably will be discharged to surface water
Formatted: Font: (Default) Open Sans, Italic
Formatted: Font: (Default) Open Sans, Italic
Formatted: Font: (Default) Open Sans, Italic
Formatted: Font: (Default) Open Sans, Italic
Formatted: Not Highlight
Formatted: Centered, Indent: Left: 0.38", Right: 0",
Space After: 0.3 pt
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
42 These procedures are described by the following operating procedures, flowcharts and tables, which are included as part of this Emergency Response Plan located in Appendix H:
• Receiving a Service Request During Business Hours;
• Receiving a Service Request After Business Hours, Weekends and Holidays; • Responding to a Service Request;
• Sanitary Sewer Overflow Response;
• Spill Notification;
• Complete the paperwork;
• Sewage Spill Responsibility;
• Additional Support for Emergency Operations;
• SSO Water Quality Sampling SOP
Identification of the Overflow Emergency Response Plan responders:
Receiving a Service Request
The City of Santa Clara’s website instructs customers to call the sewer division directly during business hours at 408-615-2000 to report sewer-related problems. During business hours, one Maintenance Worker is dispatched to perform the initial evaluations of the problem and resolve it if possible. Additional crew members are called in if necessary.
Customers are instructed to call 408-615-5640 on weekends, holidays and after business hours.
These after-hours calls are received by the Water/Electric control Operators. Sewer Division and qualified Water Division Maintenance Workers may choose to be on call to respond to after- hours service calls. The Water/Electric Control Operators maintain a list of these on -call crew members. The City is also will contract with local private contractors to handle spill related during regular hours and after-hours calls. Staff has working relationships with multiple local vendors
The following procedure has been established for responding to a customer service request for a backup:
First Responder: The Utility sends out one person to check the City main and the lower lateral to determine if there is a stoppage in the City-owned system, or if the stoppage is in the customer- owned lateral. The first responder then meets with the customer to discuss the location of the problem.
If the stoppage is determined to be in the lower lateral, The City will run a drain auger out to the city main in attempt to clear the blockage. They may also elect to plunge the blockage if it is deemed risky to insert the drain auger. For other types of problems, or items relating to blockages in the upper portion of the lateral, the first responder will advise the customer of appropriate actions to take.
If the stoppage is determined to be in the main line, the first responder will call in a jet truck and crew to relieve the problem. After clearing the stoppage, the line will be assessed and scheduled for further work if necessary. A CCTV inspection will be completed if the stoppage was particularly problematic, or if the inspection is deemed useful for other reasons.
If the crew cannot clear the stoppage, the line will be repaired. If a problem is found that requires repairs, the Assistant Sanitary Sewer Superintendent will be notified and will call USA. The Crew Supervisor will mark the work area and will get his crew to saw out, excavate, complete the repair, backfill and clean up.
In addition, the crew will also perform repairs to manholes that were either damaged during the process of clearing the stoppage or if any prior deficiencies were discovered.
A Sewer/Water Division employee is immediately notified when a spill occurs. After business Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
43 hours, upon becoming aware of a spill (either through the initial service call or by notification from other sources), the Water/Electric Operators call Sewer and Water Division Maintenance Workers and supervisory staff, working their way up the chain-of-command, until a city employee is reached. City workers try to respond to service calls within 30 minutes. The private contractor will be instructed to contact the Operators immediately upon becoming aware of a spill.
Program to Ensure an appropriate Response in all Overflows Responding to a Service Request
During business hours, the first Responder calls the Crew Supervisor or Assistant Sanitary Sewer Superintendent if additional staff or equipment is needed to assist with response. Each Sewer Division truck is equipped with a radio. After business hours, the first Responder calls the Water/Electric control Operators if additional staff or equipment are needed to assist with response. The Operators then call in other staff.
The Sewer Division maintains an SSO-response truck/trailer. First Responders may call for the truck/trailer to the service request location. Additional equipment is called in as needed for larger spills.
A binder containing all Sewer division SOPs and a packet of additional SSO reference and documentation material are included in the truck/trailer. Also included in the Emergency Response Procedures in Appendix H, is the SOP: Sanitary Sewer Overflow (SSO) Response a nd SOP: Sanitary Sewer Overflow Sampling.
Lateral Responsibility
Property owners own the entire length of their laterals. Property owners are responsible for dealing with blockages and backups resulting from blockages in their lateral. City employees do not work on the customer’s upper lateral under any circumstances. I f there is a blockage in a lateral and there is not an existing property line cleanout, the property owner is responsible for dealing with the blockage and backup. The City is not responsible for damages due to blockages in these laterals. City employees will check the lower lateral provided that there is a property line cleanout.
Sewer Division staff will explain this policy to the customer and offer to schedule a property line cleanout installation so that future backups caused by problems in the lower lateral could be identified and resolved.
Procedures to ensure prompt notification to appropriate regulatory agencies The Water and Sewer Operations Manager or any registered Data Submitters (DS) is responsible for entering reports of SSOs into the California Integrated water quality system (CIWQS), as required by the Monitoring and Reporting Program in the State Water Board Order No. 2006 - 0003-DWQ. The Water and Sewer Operations Manager is responsible for certifying SSO reports to CIWQS. Two-hour notifications, as required, may be made by the Primary LRO, and in the event of their absence, notification may be made by the Assistant Water & Sewer Superintendent, Assistant Sanitary Sewer Superintendent, Assistant Director, or Director. The Water and Sewer Operations Manager is also responsible for completing the SSMP Audit Report every two years.
The SSO Notification and Reporting Flowcharts are referenced in Element 2 as Figures 2 -1 and 2-2.
Officials Receiving Immediate Notification of SSO’s- (Spills resulting from a problem with a main line)
Contact Circumstances for Immediate Notification
Formatted: Indent: Left: 0"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
44 Operations Manager /
Assistant Superintendent/
Water and Sewer
Compliance Manager
If the SSO reaches surface water, indicating if water quality samples need to be taken.
Public Works/ Operations &
Maintenance Division/storm
drain and street
maintenance sub-divisions
If the spill enters the storm system.
Office of Emergency
Services
For all SSOs greater than 1,000 gallons reaching surface waters or spilled in a location where it probably will be discharged to surface water
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
45 ELEMENT 7: FOG SEWER PIPE BLOCKAGE CONTROL
PROGRAM
Fats, Oils, and Grease (FOG) are common sources for sewer system backups and blockages that could potentially results in SSOspills. The City of Santa ClaraUtility conducts regular inspections to ensure restaurants have the properly-sizedproperly sized and maintained grease removal device to keep FOG from entering the collection system. The CityUtility notifies each facility that an inspector will be conducting a walkthrough of the premises to review business practices and maintenance records regarding the proper cleaning of grease removal devices.
Education/Outreach for Proper Disposal of FOG
As part of the CityUtility’s restaurant FOG inspection program, education and outreach materials, along with fact sheets are distributed to potential FOG producing facilities or operations. They address issues such as:
• Grease Trap Maintenance
• Grease Interceptor Maintenance
• Grease Control Device Maintenance Documentation
• Power-Operated Grease Removal Devices
• Prohibitions of Chemicals, Enzymes and Bacteria in Grease Traps and Interceptors • Proper Cleaning and Rinse Water Disposal
• How to Clean Your Grease Trap
• Managing Fats, Oils and Grease
The fact sheets mentioned constitute Best Management Practices and are attached in Appendix I.
I. All of the above materials are available to inspectors and plan check staff to distribute to restaurant owners and operators. These materials are also distributed to the food service Requirement:
The FOG source control program shall include the following as appropriate:REQUIREMENT
The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags, and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed. The procedures must include, at minimum:
(a) An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substancesFOG;. (b) A plan and schedule for the disposal of FOGpipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substancesFOG generated within a sanitary sewer system service area.; (c) The legal authority to prohibits discharges to the system and identifiesy measures to prevent spillsSSOs and blockages. caused by FOG; (d) Requirements to install grease removal devices (such as traps or interceptors), design standards for thee grease removal devices, maintenance requirements, best management practices (BMP) requirements, record keeping and reporting requirements.; (e) Authority to inspect grease producing facilities, enforcement authorities, and determination of whether the Enrollee collection system agency has sufficient staff to inspect and enforce the FOG ordinance.;
(f) An identification of sanitary sewer system sections subject to fats, oils, and greaseFOG blockages and the establishment of a cleaning maintenance schedule for each section; and
(g) IDevelopment and implementation of source control measures, for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.FOG
Formatted: Body Text, Indent: Left: 0.42", Right: 0", No bullets or numbering, Tab stops: Not at 0.53"
Formatted: Font: 10 pt, Italic
Formatted: Font: Italic
Formatted: Normal, Indent: Left: 0.1", Space Before:
0.05 pt
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
46 establishment upon initial inspection and at any time deemed pertinent. These materials are available on the City’s website and are distributed by Utility Water & Sewer Utility staff as necessary. In addition, sewer crews may distribute notices in areas that have noted FOG “Hot Spots”.
Disposal of Fats, Oils, and Grease
Although no FOG disposal sites are located in the City of Santa Clara, there are ample opportunities for proper disposal in the immediate vicinity of the City. All FOG collected within the city limits are usually handled by commercial grease disposal compa nies. The CityUtility provides a list of local grease hauling companies to restaurants and food preparation facilities. A copy of this hand-out is attached in Appendix I.
Legal Authority to Prohibit Discharges
The legal authority of the City rests in the City of Santa Clara’s Charter (ref: Section 400, Article IV Powers) and adopted City code. Specific to waste discharge requirements for sanitary sewer system, Code Title 13, Chapter 13.10 “Sewers” codifies all requirements related to sewers. The specific Authority to prohibit discharges can be found in Appendix B.
• Storm and other waters - 13.10.230
• Grease, oils, fats - 13.10.270
• Solid or viscous matter - 13.10.280
Requirements to Install Grease Removal Devices
The following standards can be found in as provided in Appendix B.
• Maintenance Requirements – 13.10.380
• Best Management Practices Requirements – 13.10.380
• Record Keeping - 13.10.520
• Reporting Requirements – 13.10.520
Authority to Inspect
The City of Santa ClaraUtility has sufficient staff to inspect FOG producing facilities or operations, including a Compliance Manager, Code Enforcement Officer and Code Enforcement Technician. The City Code includes sections to address inspection and enforcement issues which can be found in Appendix B.
• Power to Inspect – 13.10.570
• Responsibility – 13.10.530
• Publication of Users in Significant Non-Compliance - 13.10.660
Identification of FOG “Hot Spots”
The CityUtility of Santa Clara’s Sewer utility Crews havehas identified “Hot Spots” in the collection system that may be caused by a variety of reasons including FOG. In order to mitigate any potential blockage or SSOspill resulting from these anomalies, these areas are on a more frequent inspection and cleaning regimen. The list of City FOG Hotspots is referenced in Element
4. Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
47 Source Control Measures to Prevent SSOSpills/blockages of FOG The discharger is required to use Best Management Practices (BMP) or have in place a Grease Interceptor or for smaller kitchens at a minimum a Grease Trap on appropriate outlets.
The FOG Control Program is designed for inspections as well as education for the discharger.
The inspection includes a tour of the facility, use of BMPs, physical inspection of any/all grease removal devices and review of all records related to the cleaning, pumping and repair of these devices. Discrepancies found during the inspection are duly noted and followed -up after corrective action is scheduled.
The City of Santa Clara adopted a minimum pipe size of eight (8) inches for sanitary sewers in residential areas. There are very limited pipe sizes below six (6) inches. City terrain naturally flows northerly towards the Bay.
The Sewer Division crew completing Utility jet flushing crew makes note of excessive grease/build-up or blockage in any segment of the collection system. The information is then referred to the FOG Program if it appears that any food service establishment may be contributing to the issue. This may trigger a FOG investigation in the area. The City does not have large commercial processes that produce chronic FOG problems. FOG, when found, is typically localized in nature to onsite customer laterals.
CityUtility block book maps and customer service requests from upstream discharges can be evaluated to locate areas of concern. The area upstream of the grease build up is evaluated for potential sources, and Grease Removal Device cleaning and maintenance records are reviewed.
Enforcement action is taken against establishments determined to be causing grease blockages in the sanitary sewer, and additional requirements for cleaning or installation of Grease removal device (GRD) can be imposed.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
48 ELEMENT 8: SYSTEM EVALUATION, AND
CAPACITY ASSURANCE, CAPITAL
IMPROVEMENTS PLAN
8.1 System Evaluation and Condition Assessment
REQUIREMENTS
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.The Plan must include procedures and activities for • Routine evaluation and assessment of system conditions, • Capacity assessment and design criteria.
• Prioritization of corrective actions.
• Capital improvement plan.
Requirement:
The City shall prepare and implement a capital improvement plan (CIP) that will provide hydraulic capacity of key sanitary sewer system elements for dry weather peak flow conditions, as well as the appropriate design storm or wet weather event. At a minimum, the plan must include:
(a) Evaluation: Actions needed to evaluate those portions of the sanitary sewer system that are experiencing or contributing to an SSO discharge caused by hydraulic deficiency.
The evaluation must provide estimates of peak flows (including flows from SSOs that escape from the system) associated with conditions similar to those causing overflow events, estimates of the capacity of key system components, hydraulic deficiencies (including components of the system with limiting capacity) and the major sources that contribute to the peak flows associated with overflow events. (b) Design Criteria: Where design criteria do not exist or are deficient, undertake the evaluation identified in (a) above to establish appropriate design criteria. (c) Capacity Enhancement Measures: The steps needed to establish a short - and long- term CIP to address identified hydraulic deficiencies, including prioritization, alternatives analysis, and schedules. The CIP may include increases in pipe size, inflow and in filtration (I/I) reduction programs, increases and redundancy in pumping capacity, and storage facilities. The CIP shall include an implementation schedule and shall identify sources of funding.
(d) Schedule: The City shall develop a schedule of completion dates for all portions of the capital improvement program developed in (a)-(c) above. This schedule shall be reviewed and updated consistent with the SSMP review and update requirements as described in Section D. 14 [of the GWDR].
Formatted: Normal, Right: 0"
Formatted: List Paragraph, Bulleted + Level: 1 +
Aligned at: 0.35" + Indent at: 0.6"
Formatted: Font: 10 pt, Italic
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
49 The CityUtility’s sewer condition assessment program consists of the following: In order to assess the condition of the existing sanitary sewer system, the City aims to conduct closed circuit television (CCTV) monitoring of the system every 8 years. This includes the following:
• CCTV of all sewer mains and visual inspection of manholes every 8 years • Inspection of sewer pumps every 6 months
• Inspection of standby generators every 1 year.
CCTV of sewer mains 12-inches or less by City crews
CCTV of sewer mains greater than 12-inches by outside contractors CCTV of sewer siphons by outside contractors
Inspection of force mains by outside contractors
Visual assessment of manholes and pipeline connection to manholes conducted as CCTV is conducted for sewer mains
Visual assessment and maintenance of sewer pumps every 6 months
After CCTV inspection, occurs,sewer mains arepipe is assigned a condition ratinggrade based on the industry standard and nationally recognized NASSCO PACP rating system and methodology.. in assessing sewer assets and identifying defects. All personnel performing CCTV inspection are required to be certified through NASSCO PACP.
CCTV records and associated observations are documented and recorded using IT Pipes. Documentation and video records collected using IT Pipes and are uploaded to and stored toin Lucity, the Utility’s utilized asset management software.
The largest impact of climate change on the Utility’s ability to respond to issues in the sanitary sewer system are
REQUIREMENTS
The Plan must include procedures to:
(a) Evaluate the sanitary sewer system assets utilizing the best practices and technologies available.
(b) Identify and justify the amount (percentage) of its system for its condition to be assessed each year.
(c) Prioritize the condition assessment of system areas that:
a. Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies.
b. Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas. c. Are within the vicinity of receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List (check with your local Regional Water Quality Control Board for their latest lists).
(d) Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods.
(e) Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State.
(f) Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities.
(g) Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.
Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances.
Formatted: List Paragraph, Bulleted + Level: 1 +
Aligned at: 0.25" + Indent at: 0.5"
Formatted: Font: 10 pt
Commented [LT27]: Don’t need to breakdown by who
performs the inspection.
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: Font: 10 pt, Italic
Formatted: List Paragraph, Right: 0.25", Numbered +
Level: 1 + Numbering Style: a, b, c, … + Start at: 1 +
Alignment: Left + Aligned at: 0.35" + Indent at: 0.6", Tab stops: Not at 0.31"
Formatted: Font: 10 pt, Italic
Formatted: Font: 10 pt, Italic
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
50 anticipated to be related to sea level rise and flood risk. The City is not located in a coastal flood zone, but does feature creeks through City limits, and has potential to experience larger than expected storms. The City currently plans capacity around a 10-year storm event, or 100-year storm event if near a storm drain pump station, consistent with the previous and in-progress Sanitary Sewer Master Plans and capacity studies. In addition, the Utility has continued coordination with SCVWD regarding flood protection and levees to mitigate potential flooding from surface waters within City limits. The Utility plans to continue tracking industry guidance on potential vulnerabilities to direct or indirect effects of climate change and adjust procedures accordingly.
8.2 Capacity Assessment and Design Criteria
The City of Santa Clara’s Design Criteria has been addressed in Element 5: Design & Performance Provisions.
The City of Santa Clara Sewer Capacity Assessment was completed in 2007 and updated in 2016; both reports are attached as Appendix J. The City is currently in the process of developing its Sanitary Sewer Master Plan, which includes the development of an “all-pipes” model, revised system-wide capacity studies, and an updated Capital Improvement Program. The Sanitary Sewer Master Plan is expected to be completed by the end of 2025 and before the next Sewer System Management Plan Update, and revised findings will be described in the next Sewer System Management Plan. For reference, a draft of the in- progress Sanitary Sewer Master Plan is included as Appendix J.
The major flow contributors to the sanitary sewer collection system have been identified. Lists of major dischargers are updated on a monthly basis and are listed in the table on the following page.
REQUIREMENTS
The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key syst em elements for::
(a) Dry-weather peak flow conditions that cause or contribute to spill events. (b) The appropriate design storm(s) or wet weather events that causes or contributes to spill events.
(c) The capacity of key system components.
(d) Identify the major sources that contribute to the peak flows associated wit h sewer spills.
The capacity assessment must consider:
(a) Data from existing system condition assessments, system inspections, system audits, spill history, and other available information. (b) Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions.
(c) Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change. (d) Increases of erosive forces in canyons and streams near underground and aboveground system components due to larger and/or higher -intensity storm events.
(e) Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and (f) Necessary redundancy in pumping and storage capacities. (a) Evaluate the sanitary sewer system assets utilizing the best practices and technologies available.
(b) Identify and justify the amount (percentage) of its system for its condition to be assessed each year.
(c) Prioritize the condition assessment of system areas that:
a. Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies. b. Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas. c. Are within the vicinity of receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List (check with your local Regional Water Quality Control Board for their latest lists).
(d) Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods.
(e) Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State.
(f) Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities.
(g) Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: Font: 10 pt
Formatted: List Paragraph, Right: 0", Bulleted + Level:
1 + Aligned at: 0.25" + Indent at: 0.5"
Formatted: Not Highlight
Formatted: Indent: Left: 0.25"
Formatted: List Paragraph, Numbered + Level: 1 +
Numbering Style: a, b, c, … + Start at: 1 + Alignment:
Left + Aligned at: 0.25" + Indent at: 0.5"
Formatted: Font: 10 pt, Italic
Formatted: Normal, Indent: Left: 0.1", No bullets or
numbering
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
51 Table 8-1 Significant Industrial Users in the City as of 202419 49ERS STADIUM MANAGEMENT
AGILENT TECHNOLOGY #9000081235
AKT AMERICA INC
APCT INC
APPLE INC
APPLIED MATERIALS
COLOVORE LLC
CORESITE CORONADO STENDER LLC
CYXTERA DATA CENTERS INC
DIGITAL REALTY TRUST LP TOTALZ
ELECTRIC DEPT
FUJIFILM DIAMATIX INC
HARBOR ELECTRONICS INC
INTEL CORPORATION (BOWERS 1)
INTEL CORPORATION (MCB 1)
INTEL CORPORATION (MCB 1)
INTEL CORPORATION (BOWERS 2)
OWENS CORNING SALES LLCPALO ALTO NETWORKS
QUALITY TECHNOLOGY SERVICES
STREAMLINE CIRCUITS CORP
TTM TECHNOLOGIES INC
VANTAGE DATA CENTERS LLC
VAREX IMAGING WEST HOLDINGS LLCWONDER ICE CREAM
8.3 Prioritization of Corrective Actions
Defects identified through condition assessment are reviewed by Utility staff and used to prioritize repairs.
Severity of defect, defect type, size of pipe, location of pipe, and previous maintenance hi story are considered. Point repairs are completed on an as-needed basis by Sewer Division crews, and the Utility implements an annual sewer repair project to be completed by contractors to repair high priority assets where the scope of the repair exceeds that which can be completed by Sewer Division crews (i.e. large diameter trunks, pipelines with defects to large or too frequent to be addressed by point repairs, locations where intensive traffic control is needed). Historically, the annual repair project has addressed severe defects in large diameter (33-inches to 48-inches) sewer trunks with significant tributary sewershed.
The schedule for these Capital Improvement Projects is listed in Element 4.
8.4 Capital Improvement Plan
REQUIREMENTS
The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the sever ity of the consequences of potential spills.The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for:
(a) Dry-weather peak flow conditions that cause or contribute to spill events. (b) The appropriate design storm(s) or wet weather events that causes or contributes to spill events.
(c) The capacity of key system components.
(d) Identify the major sources that contribute to the peak flows associated with sewer spills.
The capacity assessment must consider:
(a) Data from existing system condition assessments, system inspections, system audits, spill history, and other available information. (b) Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions.
(c) Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change. (d) Increases of erosive forces in canyons and streams near underground and aboveground system components due to larger and/or higher-intensity storm events. (e) Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and (f) Necessary redundancy in pumping and storage capacities.
Formatted: Not Highlight
Formatted: Body Text, Indent: Left: 0.42", Space
Before: 3.1 pt
Formatted: Not Highlight
Formatted: Indent: Left: 0", Right: 0"
Formatted: Normal, Right: 0", No bullets or
numbering
Formatted: Right: 0"
Formatted: Normal, Right: 0", No bullets or
numbering
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
52 The Public Works’ Engineering Department is responsible for managing the Public Works’ portion of the City’s Capital Improvements Program, which includes Sewer capital improvement projects.
If major deficiencies warranting rehabilitation or replacement of sewer system components are identified as a result of routine main-line cleaning or CCTV inspections that require resources beyond those available to the Sewer Division, the Assistant Sanitary Sewer Superintendent contacts the Principal Engineer – Water and Sewer. Principal Engineer then prioritizes and coordinates with Public Works Design Division for contracting the sewer main repair activities.
The City completed a Sewer System Capacity Assessment in 2007 and a General Plan Update in 2010 for new planned development and redevelopment. An update to the Sewer System Capacity Assessment was completed in 2016. Several capacity-related capital improvement projects were identified as a result of this assessment and have since been incorporate d into the City’s Capital Improvement Program. The current schedule for these projects is shown in Table 8-
2. Sewer Revenue from rates will be used to fund these projects.
Table 8-2: Sanitary Sewer Capacity Improvement Project
System Evaluation/Capacity Assurance Plan
REQUIREMENTS
(g) The capital improvement plan must include the following items:The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills.
(a) Project schedules include completion dates for all portions of the capital improvement program.
(b) Internal and external project funding sources for each project. (c) Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.
Formatted: Not Highlight
Commented [LT28]: Need to add to this. Which have
been completed or are planned. Which are not being
implemented and why (there are a couple if I remember
right)
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Indent: Left: 0.25", Numbered + Level: 1 +
Numbering Style: a, b, c, … + Start at: 1 + Alignment:
Left + Aligned at: 0.1" + Indent at: 0.35"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
53 The City of Santa Clara Sewer Capacity Assessment was completed in 2007 and updated in 2016; both reports are attached as Appendix J.
Schedule to Implement Capital Improvement Project and complete tasks
The schedule for these Capital Improvement Projects is listed in Element 4.
Design Criteria
The City of Santa Clara’s Design Criteria has been addressed in Element 5.
Identify Major Flow Sources
The major flow contributors to the sanitary sewer collection system have been identified. Lists of major dischargers are updated on a monthly basis and are listed in the table on the following page.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
54 Table 8-1 Significant Industrial Users in the City as of 2019 49ERS STADIUM MANAGEMENT
AGILENT TECHNOLOGY #9000081235
AKT AMERICA INC
APCT INC
APPLE INC
APPLIED MATERIALS
CORESITE CORONADO STENDER LLC
CYXTERA DATA CENTERS INC
DIGITAL REALTY TRUST LP
ELECTRIC DEPT
FUJIFILM DIAMATIX INC
HARBOR ELECTRONICS INC
INTEL CORPORATION (BOWERS 1)
INTEL CORPORATION (MCB 1)
INTEL CORPORATION (MCB 1)
INTEL CORPORATION (BOWERS 2)
OWENS CORNING SALES LLC
QUALITY TECHNOLOGY SERVICES
STREAMLINE CIRCUITS CORP
TTM TECHNOLOGIES INC
VANTAGE DATA CENTERS LLC
VAREX IMAGING WEST HOLDINGS LLC
As previously stated, The schedule for these Capital Improvement Projects is listed in Element
4.the City’s Sanitary Sewer Master Plan is expected to be completed by the end of 2025 and before the next Sewer System Management Plan Update, and revised Capital Improvement Projects will be described in the next Sewer System Management Plan.
Identify Funding Sources
The funding sources for the City’s Capital Improvement Plan for the Water and Sewer Utilities are derived from sewer rates, connection fees and bonding proceeds. A copy of the Sewer Utility Budget is attached in Appendix KK.
Formatted: Indent: Left: 0"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
55 ELEMENT 9: MONITORING, MEASUREMENT, AND
PROGRAM MODIFICATIONS
Performance Measures
The City of Santa ClaraUtility will use the following measures to assess the performance of the collection system and the effectiveness of its SSMP:
• total number of SSOspills;
• number of SSOspills by each cause (roots, grease, debris, capacity, pipe failure, pump station failures, and other);
• portion of sewage contained compared to total volume spilled; • volume of spilled sewage discharged to surface water; and • planned to actual performance for preventivepreventative maintenance.
Implementation and Effectiveness
The CityUtility implements all elements of this SSMPthe SSMP and has been effective in minimizing SSOspill occurrences.
Preventative Maintenance Program
The City of Santa ClaraUtility’s preventative maintenance program has been utilized for many years and has resulted in a low number of SSOspills as indicated by Figure 9-1 below.
Performance Monitoring and Program Changes
The City of Santa ClaraUtility will evaluate the performance of its wastewater collection system at least annually using the identified performance measures. The CityUtility will update the data and analysis in this section at the time of evaluation. The CityUtility may use other performance measures in its evaluation. The CityUtility will prioritize its actions and initiate changes to this SSMPthe SSMP and the related programs based on the results of the evaluation.
SSOSpill Trends: Frequency, Location, and Volume
The CityUtility maintains records on SSOspills for 5 years. Figure 9-1 shows the frequency and volume of SSOspills by from Calendar Years 202012-202419 Table 9-1 shows SSOspill causescauses, and Figure 9-2 displays the location of SSOspills within the City of Santa Clara.
From this data, it is apparent that the CityUtility experiences low SSOspill rates.
Requirement: The City shall:REQUIREMENTS
The Plan must include an Adaptive Management section that addresses Plan - implementation effectiveness and the steps for necessary Plan improvement, including:
(a) Maintaining relevant information, including audit findings, that can be used to establish and prioritize appropriate SSMPlan activities.; (b) Monitoring the implementation and, where appropriate, measuringe the effectiveness of each Plan element of the SSMP;.
(c) Assessing the success of the preventative maintenance program;activities. (d) Updateing Plan program elements procedures and activities, as appropriate, based on results monitoring andor performance evaluations; and (e) Identifying and illustrating e SSOspill trends, including spill : frequency, locations, and estimated volumes.
Formatted: Right: 0.02"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
56 Figure 9-1: Frequency and Volume of Spills 2020-2024 Figure 9-1:
Frequency and Volume of SSOs 2012-2019
Table 9-1: SSOSpill Causes per Figure 9-1 2012-20192020-2024
Cause Category
Number
% of
Total
Blockage
Roots 32 1122.0
022%
Grease/FOG 125 4655.0
056%
0 1
2 3
4 5
2020 2021 2022 2023 2024
Category 1 (Reaches surface waters) Category 2 (> 1,000 gal) Category 3 (50 - 1,000 gal) Category 4 (< 50 gal)
0 1
2 3
4 5
2012 2013 2014 2015 2016 2017 2018 2019
Category 1
1-99 Gallons
100-999 Gallons
>999 Gallons
Formatted: Not Highlight
Formatted: Not Highlight
Formatted: Centered, Indent: Left: 0.42", Right: 0.7", Space Before: 3 pt
Commented [MD29]: Needs to be updated
Formatted: Centered, Indent: Left: 0"
Formatted: Centered
Formatted: Centered, Indent: Left: 0"
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
57 Debris 40 160.00
%
Other 20 80.00%
Multiple Causes 10 0.11.00
11%
Subtotal for Blockage 210 810.00
%
Infrastructure 50 190.00
%
Inflow & Infiltration 0 0.00%
Flow Capacity Deficiency 0 0.00%
Natural Disaster 0 0.00%
Bypass 0 0.00%
Cause Unknown 0 0.00%
Contractor/Private Party 01 0.0011.
11%
Total 269 100%
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
58 Figure 9-2: SSOSpill Location
Map 2020-2024 2012-2019
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
59 Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
40 ELEMENT 10: SSMP PROGRAM AUDITS
The Audit Process
The City of Santa ClaraUtility will internally audit its implementation and compliance with the provisions of this SSMPthe SSMP every 32 years. The scope of the audit covers each major section of the SSMP. The audit check list will be based on the requirements in the WDR and is included as Appendix MM.
The results of the audit, including the identification of any deficiencies and the steps taken or planned to correct them, will be included in an Audit Report. Completed Audit Reports will be kept on file internally and made available for review/inspection.
SSMP Updates
The City of Santa ClaraUtility will determine the need to update its SSMP based on the results of the audit and the performance of its wastewater collection system based on information from the Monitoring and Measurement Program. If the CityUtility decides that an update is warranted, the process to do so will be identified. The CityUtility will complete the update within one year of the original audit. The SSMP will be updated/recertified at least once every 65 years.
Requirement:
As part of the SSMP, the City shall conduct periodic internal audits, appropriate to the size of the system and the number of SSOs. At a minimum, these audits must occur every two years and a report must be prepared and kept on file. This audit shall focus on evaluating the effectiveness of the SSMP and the City’s compliance with the SSMP requirements identified in this subsection (D.13 [of the GWDR]), including identification of any deficiencies in the SSMP and steps to correct them.REQUIREMENTS The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order.
Specifications 5.4 (Sewer System Management Plan Audits) “The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the Enrollee’s last required au dit period.
Within six months after the end of the required 3-year audit period, the Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (Sewer System Managemen t Plan Audit Reporting Requirements) of Attachment E1 of this General Order. Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff. The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The Enrollee’s sewer system operations must be involved in completing the audit. At minimum, the Audit must”
(a) Evaluate the implementation and effectiveness of the Enrollee’s Sewer System Management Plan in preventing spills.
(b) Evaluate the Enrollee’s compliance with this General Order. (c) Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and
(d) Identify necessary modifications to the Sewer System Management Plan to correct deficiencies.
(e) The Enrollee shall submit a complete audit report that includes:
a. Audit findings and recommended corrective actions.
b. A statement that sewer system operators’ input on the audit findings has been considered; and
c. A proposed schedule for the Enrollee to address the identified deficiencies.
Formatted: Font: 10 pt, Italic
Formatted: Font: 10 pt, Italic
Formatted: Font: 10 pt, Italic
Formatted: Font: 10 pt, Italic
Formatted: List Paragraph, Numbered + Level: 2 +
Numbering Style: a, b, c, … + Start at: 1 + Alignment:
Left + Aligned at: 0.85" + Indent at: 1.1"
Formatted: Font: 10 pt, Italic
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
41 ELEMENT 11: COMMUNICATION PROGRAM
Communication during SSMP Development and Implementation CityUtility Staff began work on an update to the SSMP development in 2017 to reflect current conditions, show updates in staff, and address the CityUtility’s takeover of the fats, oils, and grease (FOG) program from the City of San JoseSan José. The FOG program update and implementation was approved by the City of Santa Clara Council on December 19, 2017. In addition, minor updates to the SSMP were completed in 2019. Public access to the SSMP will be available on the City of Santa Clara’s website, the City’s Utility Center and at the Water and Sewer Utilities at City Hall prior to finalization..
The City of Santa Clara is a co-owner of the San JoseSan José-Santa Clara Regional Wastewater Facility (Facility), and the City of San JoseSan José is the Operator of the Facility.
The City is a member of both Facility Technical Advisory Committee (TAC) and Treatment Plant Advisory Committee (TPAC). Both committees serve as forums for issues related to the Facility; TAC is comprised of staff and TPAC comprised of elected officials. These committees meet regularly and both agendas and minutes are available on the City of San Jose’sJoseSan José’sJose’s website. The content of the meetings deals with updates discussion of issues and soliciting feedback from the Facility’s tributary agencies on issues related to influent, effluent, and the operations of the Facility. The seven tributary agencies include: City of Santa Clara, the City of Milpitas, West Valley Sanitation District, Cupertino Sanitary District, Burbank Sanitary District, Sunol Sanitary District and County Sanitation Districts 2 and 3.f
Santa Clara staff will conduct a wide variety of outreach, including providing public education pieces which are targeted to reach residential, industrial, and commercial customers, as well as the general public. Informational flyers and other public outreach material are distributed periodically to local businesses and residentsresidents and are available on the City’s website.
Periodically, public education articles may be published on the website or in the City’s Inside Santa Clara publication.
Requirement:
The Plan must include procedures for the Enrollee to communicate with:
(a) City shall communicate on a regular basis with tThe public on the development, implementation, and performance of its SSMP. The communication system shall provide the public the opportunity to provide input to the City as the program is developed and implemented.for spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and the development, implementation, update of its Plan, including opportunities for public input to Plan implementation and updates.
(b) Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for system operation, maintenance, and capital improvement - related activities.
The City shall also create a plan of communication with systems that are tributary and/or satellite to the City’s sanitary sewer system.
Formatted: Font: 10 pt, Italic
Formatted: Font: 10 pt, Italic
Formatted: List Paragraph, Numbered + Level: 1 +
Numbering Style: a, b, c, … + Start at: 1 + Alignment:
Left + Aligned at: 0.35" + Indent at: 0.6"
Formatted: Font: 10 pt, Italic
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
42 Summary of Revisions to the Sewer System Management Plan General
• Minor re-structuring of SSMP to conform to requirements in SWRCB General Order 2022-0103-DWQ.
• Updates to sewer system asset and organizational information as needed throughout SSMP.
• Revised general reference of “City” to “Utility” to avoid confusion with other City Departments.
• Revised general reference of SSO to “spill” to be consistent with references in General Order 2022-0103-DWQ.
Element 1 – Introduction
• Added new section “1.1 Regulatory Context”.
• Included brief narrative on in-progress Sanitary Sewer Master Plan in section “1.1 Regulatory Context”.
• Added new section “1.2 Sewer Management Plan Update Schedule”. • Added schedule for future SSMP updates, audits, and planned operation and maintenance activities.
• Added new section “1.3 Sewer System Asset Overview”.
• Added discussion on SCADA system.
Element 2 – Organization
• Updated Authorized Representatives, City Key Emergency contacts, and organization chart.
Element 3 – Legal Authority
• Added agency code references for defining lateral ownership and prohibiting vandalism.
Element 4 – Operation & Maintenance Program
• Added new section “4.1 Update Map of Sewer System”.
• Moved sewer system asset information to section “1.3 Sewer System Asset Overview”. • Added new section “4.2 Preventative Operation and Maintenance Activities”. • Added discussion on current condition assessment cycle. • Added discussion on CMMS.
• Revised list of high frequency cleaning segments.
• Revised narrative regarding Root Control to explicitly state that this is offered to residents as a courtesy service to address lateral blockages.
• Revised narrative regarding Rehabilitation and Replacement Plan to describe how CCTV and condition assessment findings are used to advise capital project planning. • Moved discussion of Capital Improvement Program/Major Repairs to section “8.3 Prioritization of Corrective Actions” and “8.4 Capital Improvement Plan”. • Removed reference to “Crew A” and “Crew B” for clarity. • Added new section “4.3 Training”.
• Added new section “4.4 Equipment Inventory”.
Element 5 – Design & Performance Provisions
• Added new section “5.1 Updated Design Criteria and Construction Standards”. • Added new section “5.2 Procedures and Standards”.
Element 6 – Spill Emergency Response Plan
• Significantly revised section to include updated Element 6 developed as a result of previous audit findings. This effort included a more robust response plan, additional standard operating procedures, and revised process flow charts.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
43 Element 8 – System Evaluation, Capacity Assurance, Capital Improvement Plan • Added new section “8.1 System Evaluation and Condition Assessment”. • Added discussion of condition assessment methodology. • Added discussion of potential impacts of climate change on the sanitary sewer system. • Added new section “8.2 Capacity Assessment and Design Criteria”. • Added narrative regarding in-progress Sanitary Sewer Master Plan. • Revised list of significant industrial users.
• Added new section “8.3 Prioritization of Corrective Actions”. • Added new section “8.4 Capital Improvement Program”.
Element 9 – Monitoring, Measurement, Program Modifications • Revised figures and tables documenting spills within past five years.
Sewer System Management Plan
City of Santa Clara Water & Sewer Utility
44 APPENDICES
Appendix A: State Water Resources Control Board General Order 2022-0103-DWQ Appendix B: Santa Clara Municipal Code Excerpts
Appendix C: Enforcement Response Plan
Appendix D: Sanitary Sewer System Index Map
Appendix E: Sewer Equipment Inventories
Appendix F: City of Santa Clara Design Criteria
Appendix G: City of Santa Clara Standard Details
Appendix H: Emergency Response Procedures
Appendix I: FOG Program Materials and Handouts
Appendix J: City of Santa Clara Sewer Capacity Assessment Appendix K: Sewer Utility Budget
Appendix L: Performance Measure Data Sheets (Lucity)
Appendix M: SSMP Audit Checklist
Appendix A: State Water Resources Control Board General Order 2006-0003- DWQ and MRP
Appendix B: Santa Clara Municipal Code Excerpts Appendix C: Enforcement Response Plan Appendix D: Sanitary Sewer System Index
Map Appendix E: Sewer Equipment Inventories Appendix F:
City of Santa Clara Design Criteria Appendix G: City of Santa Clara Standard Details Appendix H: Emergency Response
Procedures Appendix I: FOG Program Materials and Handouts Appendix J: City of Santa Clara Sewer Capacity Assessment Appendix K:
Sewer Utility Budget
Appendix L: Performance Measure Data Sheets (Lucity) Appendix M:
SSMP Audit Checklist