Municipal Fee Schedule 2017-18
April 18, 2017
Adopted
I
CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE
Table of Contents
P a g e
Reader’s Guide ................................................................................................................ ....................... II List of Separately Published Fee Schedules ........................................................................................... V Fees Included In This Document:
City Cle rk ...................................................................................................................................... 1 - 1 City M anager ................................................................................................................................ 2 - 1 Community De velopment ........................................................................................................ ..... 3 - 1 Electric Utility ................................................................................................................................ 4 - 1 Financ e ......................................................................................................................................... 5 - 1 Fire ......................................................................................................................... ...................... 6 - 1 Libr ary ...................................................................................................................... .................... 7 - 1 Parks and Recreation
Cemetery ............................................................................................................................... .. 8 - 1 Recr eation ............................................................................................................................... 8 - 13 Polic e ............................................................................................................................................ 9 - 1 Public Works
Engi neering ............................................................................................................................. 10 - 1 Street ...................................................................................................................... ................ 10 - 16 Water and Sewe r Utilities ............................................................................................................. 11 - 1 Alphabetical List ing by Fee ........................................................................................................... 12 - 1 Resolution ............................................................................................................................... ...... 13 - 1 II
Reader’s Guide
The purpose of this Reader’s Guide is to make the City of Sant a Clara Municipal Fee Schedule for 2017-18 easier to review.
The Reader’s Guide highlights information contained in this document, defines terminology used in column headers, and briefly explains how voter approved Proposition 26 impacts the Schedule.
Fees, rates, and charges are intended to encompass all charges es tablished by license, permit fees, utility charges, refuse collection and any other charges for goods and services and use of City-owned or operated facilities. Certain fees omitted from the Municipal Fee Schedule are published separately and noted on page V of this schedule. Such fees and charges published separately are unique because they are mandat ed by external agencies or because they receive special attention and review from City Council prior to adoption.
A comprehensive listing of the City’s fees, rates, and charges, arranged in sections by department make up the City of Santa Clara Municipal Fee Schedule. During an annual review, eac h department recommends appropriate adjustments after considering the total costs to the City for each service provided. Costs include (1) personnel time (providing the service and collecting data), (2) equipment used, (3) material, service and supply costs, (4) department and City-wide overhead, and (5) any other costs that may be incurred that are directly related to the specific fees, rates or charges. Periodically, the City will contract with an outside consultant to perform a comprehensive review/study of fees. In 2016-17, NBS consulting firm completed a cost allocation plan and conducted the second phase of a comprehensive fee study.
Proposition 26
Proposition 26, passed by voters on Novem ber 2, 2010, is a constitutional amendment that introduces, for the first time, a definition of what constitutes a local tax:
As used in this section, “tax” means any levy, charge, or exaction of any kind imposed by a local government…
Under this definition, many requirements imposed by a local government that results in the local government receiving revenues are considered local taxes. This means that loca l government would need to obtain majority approval of the voters if the revenues are to be used fo r general governmental purpos e and by two-thirds of voters if used for a specific purpose. In contrast, a fee may be adopted by a majority vote of City Council. There are seve n (7) exceptions to this amendment under Proposition 26:
III
1. Special Benefit or Privilege: A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to t hose not charged, and which does not exceed the reasonable cost s to the local government of conferring the benefit or granting the privilege.
2. Government Service or Product: A charge imposed for specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service or product.
3. Licenses and Permits: A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections, and audits , enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof.
4. Local Government Property: A charge imposed for entrance to or use of local government property, or the purchase, rental or lease of a local government property.
5. Fines and Penalties: A fine, penalty, or other monetar y charge imposed by the judicial branch of government or a local government, as a result of a violation of law.
6. Property Development: A charge imposed as a condition of property development.
7. The Prop 218 Exception: Provides that property assessment and property-re lated fees that are already subject to the approval requirements of Proposition 218 ar e not taxes. Common examples incl ude water and sewer rates and special district assessments such as Landscape and Lighting District Act assessments.
All fees, rates, and charges have been reviewed by the City Atto rney’s Office and meet one or more of the exceptions to Proposition 26, or are not subject to Proposition 26.
City of Santa Clara Municipal Fee Schedule Column Descriptors
1. Description of Fee, Rate, or Charge: Ident ifies the nature of the fee, rate, or charge.
2. Current Fee and Period: Identif ies the current cost associated with the fee, rate, or charge.
IV
3. Charging Dept/Div: City Department responsib le for initiating the fee, rate, or charge.
Collecting Dept/Div: City Department assi gned to collect the fee, rate, or charge.
4. Date Fee Last Changed: The date the fee wa s last updated by ordinance and/or resolution.
5. Fee Detail:
Objective: The reasoning as to why the City collects the fee, rate, or charge. Th is schedule may identify one or more of the following classifications: (1 ) Recover Cost, (2) User Tax, (3) User Fee, (4) Penalty, (5) Compliance, and (6) Impact Development Fee.
Prop 26 Exception: Identifies exception classification for the fee, rate, or charge. The reader will see numbers 1-7, or a combination of 1-7, as some fees, rates, and charges fall under multiple classificati ons. N/A signifies the fee, rate, or charge is not a fee imposed exclusively by local government.
Full Cost: Summarizes both direct and indire ct costs associated with the fee, rate, or charge. If no cost is provided, the basis for the charge is defined eit her by ordinance or re solution, calculated separ ately based on individual circumstances, or established by an outside entity.
6. Comments: Identifies spec ial notes related to the specific fee, rate, or charge.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E The Following is a List of Separately Published Fee Schedules.
These Schedules Are Not Included in This Document.
Copies of These Documents Can Be Found in the City Clerk's Office Located at City Hall and at Central Library's Reference Desk. ■ Electric Utility Rate Schedules ■ Public Works Department Cleanup Campaign Charge
Garbage / Rubbish / Recycle Charges
Household Hazardous Waste Charge
■ Planning Department Uniform Administrative Code Storm Drain Environmental Compliance Fee National Electric Code
Uniform Administrative Code ■ Santa Clara Recreation Activities Guide Uniform Building Code, Volume 1, 2 and 3
Uniform Housing Code
Uniform Mechanical Code ■ Water and Sewer Utilities
Uniform Code for the Abatement of
Dangerous Buildings Water Rate Schedules
Uniform Building Security Code Sewer Rate Schedules
Solar Swimming Pool Heater Service Charges
Solar Domestic Hot Water System Service Charges
■ Taxable items are subject to applicable sales taxes at prevailing tax rates.
V
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
VI
Municipal Fee Schedule
City Clerk
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
CITY CLERK RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
Lobbying Activities $ 523.00 Charged By: Date: 5/17/2016 Objective: Recover Cost Annual Registration Fee City Clerk's Office User Fee
Res. No.: 16-8323 Prop 26 Exception: 3
Collected By:
City Clerk's Office O. No.: 1949 Full Cost: 523.00$
O. Date: 1/12/2016
Lobbying Activities $ 261.00 Charged By: Date: 5/17/2016 Objective: Recover Cost Persons registering for the Prorated Registration Fee City Clerk's Office User Fee first time after June 30th of a Res. No.: 16-8323 Prop 26 Exception: 3 given year
Collected By:
City Clerk's Office O. No.: 1949 Full Cost: 261.00$
O. Date: 1/12/2016
Lobbyists with a change to
Lobbying Activities $ 97.00 Charged By: Date: 5/17/2016 Objective: Recover Cost registration information shall Amended Registration Fee City Clerk's Office User Fee file an amended registration Res. No.: 16-8323 Prop 26 Exception: 3 within fifteen (15) days of such Collected By: change if he or she has
City Clerk's Office O. No.: 1949 Full Cost: 97.00$ accepted a new client for O. Date: 1/12/2016 compensation in excess of five
hundred dollars ($500.00)
Lobbying Activities $ 25.00 Charged By: Date: 5/17/2016 Objective: Recover Cost Up to a maximum of $500.00 Delinquent Fee per day City Clerk's Office Penalty
Res. No.: 16-8323 Prop 26 Exception: 5
Collected By:
City Clerk's Office O. No.: 1949 Full Cost: 25.00$
O. Date: 1/12/2016
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Annual registration is due by
January 15th of a given year
Reference: CMD 109 1 - 1 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
1 - 2
Municipal Fee Schedule
City Manager
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
CITY MANAGER / ADMINISTRATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS City Administrative Building $ 15.00 Charged By: Date: 6/10/2003 Objective: Recover Cost Rental of Council Chambers Rental (excludes use of City per hour City Clerk's Office includes use of built-in audio projection/slide equipment 7:30 AM - O. No.: Prop 26 Exception: 4 system (podium mic) but located in Council Chambers. 5:00 PM does not include use of Audio equipment is built in $ 20.00 Collected By: O. Date: Full Cost: 48.49$ built-in projection screens and available.) [No charge per hour Finance or computer projection for governmental agencies] after equipment.
5:00 PM
City Charter
Charged By: Date: 6/10/2008 Objective: Recover Cost
City Clerk's Office
Public $ 0.20 Res. No.: 08-7525 Prop 26 Exception: 1,2
per page
Collected By: Full Cost: 3.46$
Employees $ 0.05 City Clerk's Office
per page
FAX Machine Charged By: Date: 6/10/2008 Objective: Recover Cost Public $ 0.20 City Clerk's Office
per page Res. No.: 08-7525 Prop 26 Exception: 1,2
Employees $ 0.05 Collected By: Full Cost: 8.11$
per page City Clerk's Office
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 2 - 1 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
CITY MANAGER / ADMINISTRATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Data CD $ 3.00 Charged By: Date: 6/10/2008 Objective: Recover Cost per CD City Clerk's Office
Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:
City Clerk's Office Full Cost: 3.42$
Council meeting DVD $ 21.00 Charged By: Date: 6/10/2008 Objective: Recover Cost duplication fee per DVD City Manager's
Office Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:
City Manager's Full Cost: 23.14$
Office
Council meeting audio tape $ 15.75 Charged By: Date: 6/10/2008 Objective: Recover Cost duplication fee per tape City Manager's
Office Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:
City Manager's Full Cost: 27.01$
Office
Copy Machine Usage
Charged By: Date: 6/10/2008 Objective: Recover Cost
Public $ 0.20 City Clerk's Office
per page Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:
Employees $ 0.05 City Clerk's Office Full Cost: 0.20$
per page
Reference: CMD 109 2 - 2 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
CITY MANAGER / ADMINISTRATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Subpoena Fees $ 150.00 Charged By: Date: 7/17/1987 Objective: Compliance City
O. No.: Prop 26 Exception: * N/A
Non-Safety Employees Collected By: O. Date:
Finance CMD 99 Full Cost: N/A
Subpoena Fees $ 275.00 Charged By: Date: 4/22/2014 Objective: Compliance City
O. No.: Prop 26 Exception: * N/A
Safety Employees Collected By: O. Date:
Finance CMD 99 Full Cost: N/A
Subpoena Fees $ 30.00 Charged By: Date: 7/17/1987 Objective: Compliance per day City
Federal District Court O. No.: Prop 26 Exception: * N/A Collected By: O. Date:
Finance CMD 99 Full Cost: N/A
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 2 - 3 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
CITY MANAGER / ADMINISTRATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Mileage IRS Charged By: Date: 6/12/2001 Objective: Compliance Business City
Superior and Municipal Mileage O. No.: Prop 26 Exception: * N/A Court Rate Collected By: O. Date:
Finance CMD 99 Full Cost: N/A
Mileage IRS Charged By: Date: 6/12/2001 Objective: Compliance Business City
Federal District Court Mileage O. No.: Prop 26 Exception: * N/A Rate Collected By: O. Date:
Finance CMD 99 Full Cost: N/A
Jury Fees $ 30.00 Charged By: Date: 6/12/2001 Objective: Recover Cost per day City
Federal District Court and IRS O. No.: Prop 26 Exception: * N/A Business Collected By: O. Date:
Mileage Finance Other (specify): Full Cost: N/A
Rate CMD 25
Applications
Special Outdoor Event on Charged By: Date: 6/10/1997 Objective: Compliance City Property: City Manager
City Sponsored Event $ No fee O. No.: Prop 26 Exception: 4 Non-Profit Organizations $ 25.00 Collected By: O. Date:
All Other $ 250.00 Community Full Cost: 250.00$
Development
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 2 - 4 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
Community Development
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
Rezoning Charged By: Date: 4/18/2017 Objective: Recover Cost Rezone single lot to R1 $ 7,000.00 Community
per application Development O. No.: Prop 26 Exception: 3 O. Date:
Non Planned Development (PD) $ 13,350.00 Collected By: Full Cost: $ Varies Change in methodology Finance for calculation of fee
Planned Development (PD) $ 29,370.00
$ 64,059.00 Developer Specific
$ 32,030.00 Developer Specific
Zoning Code Text Amendment $ 18,690.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Developer Specific per application Community
Development O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: $ 24,022.00
Finance
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Specific cost data available in
User Fee Study FY 16/17
Development Area Plan Related to
a PD-MC Rezoning
Planned Development Master
Community (PD-MC)
Reference: CMD 109 3 - 1 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Variance - Single Family $ 2,670.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Council policy is to per application Community subsidize single family
Development O. No.: Prop 26 Exception: 1,2,3 fees.
O. Date:
Collected By: Full Cost: $ 10,676.00
Finance
Variance - All Others $ 6,675.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per application Community
Development O. No.: Prop 26 Exception: 1,2,3
O. Date:
Collected By: Full Cost: $ 16,015.00
Finance
Minor Modifications Charged By: Date: 4/18/2017 Objective: Recover Cost Single Family $ 500.00 Community
Development O. No.: Prop 26 Exception: 1,2,3
All Others $ 1,335.00 O. Date:
Collected By: Full Cost: $ Varies
Finance
Specific cost data available in
User Fee Study FY 16/17
Reference: CMD 109 3 - 2 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Off-Site Parking Permit $ 2,136.00 Charged By: Date: 4/18/2017 Objective: Recover Cost (Citywide) Community
Development R. No.: Prop 26 Exception: 1,2,3
Off-Site Parking Permit $ 1,068.00 R. Date:
(Events North of 101) (per permit) Collected By: Full Cost: $ Varies per year for Finance
events north
of 101
Off-Site Parking Facilities $ 5.42 Charged By: Date: 4/18/2017 Objective: Recover Cost Collected from persons (Events North of 101) per space Community obtaining an Off-Site per event Development R. No.: 10-7778 Prop 26 Exception: 1,2,3 Parking Permit from N of 101 R. Date: 10/12/2010 Zoning Administrator and
Collected By: Full Cost: $ 5.42 for each parking space for Finance sports or entertainment
venues north of
Highway 101.
Specific cost data available in
User Fee Study FY 16/17
AND
Reference: CMD 109 3 - 3 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Use Permits Charged By: Date: 4/18/2017 Objective: Recover Cost Use Permit - Standard $ 9,345.00 Community
per application Development O. No.: Prop 26 Exception: 3 O. Date:
Use Permit - Minor $ 4,806.00 Collected By: Full Cost: $ Varies per application Finance
Special Permit - Council Approval $ 2,135.00 Change in methodology per application for calculation of fee
Special Permit - Non Profit $ 214.00 Change in methodology for calculation of fee
Special Permit - Admin. Approval $ 1,068.00 Change in methodology for calculation of fee
House move permit $ 18,684.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per application Community
Development O. No.: Prop 26 Exception: 3
O. Date:
Collected By: Full Cost: $ 18,684.00
Finance
Specific cost data available in
User Fee Study FY 16/17
Reference: CMD 109 3 - 4 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Maps Charged By: Date: 4/18/2017 Objective: Recover Cost 4 or Fewer Lots $ 10,680.00 Community
Development O. No.: Prop 26 Exception: 1,2,3,6
5 or More Lots $ 16,020.00 O. Date: Change in methodology Collected By: Full Cost: $ Varies for calculation of fee Lot line adjustment $ 3,471.00 Finance
per application
Appeals Charged By: Date: 4/18/2017 Objective: Recover Cost From Single Family/Non-Applicant $ 400.00 Community Council policy is to keep per request Development O. No.: Prop 26 Exception: 1,2 the appeal fee nominal.
O. Date:
From Applicant $ 8,010.00 Collected By: Full Cost: $ 21,353.00 Finance
Reposting of Public Charged By: Date: 4/18/2017 Objective: Recover Cost Notification Community
Development O. No.: Prop 26 Exception: 1,2
Single Family $ 100.00 O. Date: Council policy is to
per application Collected By: Full Cost: $ 2,937.00 subsidize single family Finance fees.
Non-Single Family $ 1,602.00
per application
Re-Noticing in Newspaper $ At Cost
Specific cost data available in
User Fee Study FY 16/17
Reference: CMD 109 3 - 5 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Annexation of territory to $ 40,037.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Developer Specific City of Santa Clara per application Community
Development O. No.: Prop 26 Exception: 1,2,3,6
O. Date:
Collected By: Full Cost: $ 40,037.00
Finance
Architectural Review Charged By: Date: 4/18/2017 Objective: Recover Cost Over the Counter $ 0.00 Community
Development O. No.: Prop 26 Exception: 1,2,6
Single Family $ 750.00 O. Date: Council policy is to
Collected By: Full Cost: $ Varies subsidize single family New development-Non-SFR $ 12,015.00 Finance fees.
Design Consultant Review $ Deposit of
Consultant
Estimated
Costs Plus
Citywide
Overhead
Reference: CMD 109 3 - 6 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Environmental Review Charged By: Date: 4/18/2017 Objective: Recover Cost City review of Draft EIR and $ 32,040.00 Community
preparation of Final EIR per application Development O. No.: Prop 26 Exception: 1,2,6 O. Date:
City Review of $ 15,000.00 Collected By: Full Cost: $ Varies Supplemental EIR/Final EIR Finance
City review or preparation of $ 18,690.00
Initial Study/MND and Negative per application
Declaration
Exemption $ 801.00
Exemption (SFR or Paperless) $ 0.00
Recordation of Exemption $ 534.00
Re-Use of Prior Environmental $ 801.00
Determination
Addendum to Prior Environmental $ 5,340.00
Determination
Deposit Fee Recommended
by NBS
Reference: CMD 109 3 - 7 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
General plan amendment $ 19,758.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Developer Specific Up to one acre per application Community
Development O. No.: Prop 26 Exception: 1,2,6
O. Date:
Collected By: Full Cost: $ 24,022.00
Finance
General plan amendment $ 26,700.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Developer Specific Over one acre per application Community
Development O. No.: Prop 26 Exception: 1,2,6
O. Date:
Collected By: Full Cost: $ 42,706.00
Finance
Development Agreement $ 21,360.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Developer Specific per application Community
Development O. No.: Prop 26 Exception: 1,2,6
Amendment or Cancellation $ 10,680.00 O. Date:
of Development Agreement per application Collected By: Full Cost: $ Varies Finance
Development Agreement $ Actual Cost
Negotiations
Reference: CMD 109 3 - 8 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Certificate of Compliance $ 3,000.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per certificate Community
Development O. No.: Prop 26 Exception: 1,2,6
O. Date:
Collected By: Full Cost: $ 5,338.00
Finance
Signs Charged By: Date: 4/18/2017 Objective: Recover Cost Sign Permit Fees $ 267.00 Community
(attached or ground) for first per application Development O. No.: Prop 26 Exception: 3 sign. O. Date:
Full Cost: $ Varies
Temporary Sign Permit/Street $ 66.00 Collected By:
Banner (pursuant to Zoning Ord. per application Finance Sec. 40-27) good for 60 days;
or
ea. additional sign under a
Sign Permit application.
Temporary Sign $ 1,068.00 Fees to be paid prior to
Removal Fees per sign retrieval of signs to
any person.
Master Sign Program $ 4,272.00
Reference: CMD 109 3 - 9 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Mills Act Application $ 5,425.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Increasing toward full per application Community cost recovery in 3 years
Development O. No.: Prop 26 Exception: 1,2 until next fee study O. Date:
Collected By: Full Cost: $ 10,677.00
Finance
Pre-Application Charged By: Date: 4/18/2017 Objective: Recover Cost Pre-Application fee Single Family $ 400.00 Community credited toward cost of Development O. No.: Prop 26 Exception: 1,2,3,6 full application fee if Planning Review $ 2,669.00 O. Date: submitted within 3 months Collected By: Full Cost: $ Varies after completion of
Project Clearance Committee $ 4,806.00 Finance preliminary review Flood Zone Verification $ 175.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Community
Development O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: $ 534.00
Finance
Zoning Verification $ 388.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Community
Development O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: $ 800.00
Finance
Reference: CMD 109 3 - 10 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Historical & Landmarks Charged By: Date: 4/18/2017 Objective: Recover Cost Single Family $ 750.00 Community Council policy is to
Development O. No.: Prop 26 Exception: 1,2 subsidize single family O. Date: fees.
All Others $ 8,010.00 Collected By: Full Cost: $ Varies Finance
Stormwater Management Plan $ 1,068.00 Charged By: Date: 4/18/2017 Objective: Recover Cost RevIew Community
Development O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: $ 1,068.00
Finance
Minor Amendment to Approved $ 667.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Projects Community
Development O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: $ 1,068.00
Finance
Heritage Tree Removal $ 534.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Council policy is to Community subsidize single family
Development O. No.: Prop 26 Exception: 1,2 fees.
O. Date:
Collected By: Full Cost: $ 2,134.00
Finance
Reference: CMD 109 3 - 11 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
COMMUNITY DEVELOPMENT RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING (SEE READER'S GUIDE)
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
DATE FEE
LAST CHANGED
FEE DETAIL
ORDINANCE
NUMBER & DATE
CURRENT
FEE
and
PERIOD
OBJECTIVE
FULL COST FACTORFULL COST FACTOR(if applicable)
PROP 26 EXCEPTION
Contract Administration $ Actual Cost Charged By: Date: 4/18/2017 Objective: Recover Cost Community
Development O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: $ Actual Cost
Finance
Time Extensions
Charged By: Date: 4/18/2017 Objective: Recover Cost
Community
Entitlement Extension $ 50% of Development O. No.: Prop 26 Exception: 1,2 application fee O. Date:
Collected By: Full Cost: $ 25-50% of
Processing Time Extension $ 25% of Finance application fee application fee
General Plan/Advance $ 15% of Charged By: Date: 4/18/2017 Objective: Recover Cost To be applied to all Building Planning Surcharge application fee Community and Planning fees except Development O. No.: Prop 26 Exception: 1, 2, 3 those fees specifically O. Date: designated as Single Family
Collected By: Full Cost: $ 1,395,839.00
Finance Description of fee/cost
available in User Fee Study
Reference: CMD 109 3 - 12 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
Electric Utility
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Overhead Lines - New $ 1,002.41 Charged By: Date: 4/18/2017 Objective: Recover Cost Single Family/Residential per lot Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 1,002.41$
Overhead Lines - New $ 617.09 Charged By: Date: 4/18/2017 Objective: Recover Cost Multiple Units per unit Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 617.09$
Overhead Lines - New $6 . 2 1 Charged By: Date: 4/18/2017 Objective: Recover Cost Street Lighting per front foot Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 6.21$
Underground - New $ 1,477.52 Charged By: Date: 4/18/2017 Objective: Recover Cost Single Family/Residential per lot Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 1,477.52$
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 4 - 1 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Underground - New $ 1,318.14 Charged By: Date: 4/18/2017 Objective: Recover Cost Multiple Units/Residential per unit Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 1,318.14$
Underground - New $ 15.27 Charged By: Date: 4/18/2017 Objective: Recover Cost Street Lighting per front foot Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 15.27$
Underground - New $ 2,329.54 Charged By: Date: 4/18/2017 Objective: Recover Cost Street Lighting per acre Electric
(Over 10 acres) O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 2,329.54$
Underground - Existing $ 2,903.24 Charged By: Date: 4/18/2017 Objective: Recover Cost Single Family per lot Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 2,903.24$
Reference: CMD 109 4 - 2 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Underground - Existing $ 1,552.09 Charged By: Date: 4/18/2017 Objective: Recover Cost Multi-Units per unit Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 1,552.09$
Underground - Existing $ 22.68 Charged By: Date: 4/18/2017 Objective: Recover Cost Street Lighting per front foot Electric
O. No.: Prop 26 Exception: 1,2,6
Collected By: O. Date:
Finance Full Cost: 22.68$
Load Development $ 119.34 Charged By: Date: 4/18/2017 Objective: Recover Cost per KVA Electric
O. No.: Prop 26 Exception: 6
Collected By: O. Date:
Finance Full Cost: 119.34$
Temporary Pole Connection $ 529.92 Charged By: Date: 4/18/2017 Objective: Recover Cost Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: 529.92$
Reference: CMD 109 4 - 3 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Temporary Power $ Actual cost Charged By: Date: Objective: Recover Cost Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: Actual Cost
Underground Street Light $ Actual cost Charged By: Date: Objective: Recover Cost Relocation Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: Actual Cost
Service Wire Relocation $ 2,015.00 Charged By: Date: 4/18/2017 Objective: Recover Cost from Mid-Span Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: 2,225.25$
Service Wire Relocation $ 489.56 Charged By: Date: 4/18/2017 Objective: Recover Cost from Pole Electric
Collected By: O. No.: Prop 26 Exception: 1,2
Finance O. Date:
Full Cost: 489.56$
Reference: CMD 109 4 - 4 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Meter Test Deposit $ 87.98 Charged By: Date: 4/18/2017 Objective: Recover Cost Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance / Full Cost: 87.98$
Municipal Serv.
Service Wire Relocation $ Cost plus 61% Charged By: Date: 8/6/1991 Objective: Recover Cost Additional Linework overhead cost Electric
Includes: plus O. No.: Prop 26 Exception: 1,2
Labor Costs 15% Warehouse Collected By: O. Date:
Material Costs expenses Finance Full Cost: As Calculated Equipment Costs
Electric System Damage $ Cost plus 61% Charged By: Date: 8/6/1991 Objective: Recover Cost Includes: overhead cost Electric
Labor Costs plus O. No.: Prop 26 Exception: 5
Material Costs 15% Warehouse Collected By: O. Date:
Equipment Costs expenses Finance Full Cost: As Calculated Energy Data Pulses $ Actual Cost Charged By: Date: Objective: Recover Cost Customer shall Electric
pay all City O. No.: Prop 26 Exception: 1,2
out-of-pocket Collected By: O. Date:
expenses Finance Full Cost: Cost
Reference: CMD 109 4 - 5 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Service Reconnection at the $ 132.48 Charged By: Date: 4/18/2017 Objective: Recover Cost Pole/Weatherhead Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance / Full Cost: 132.48$
Municipal Serv.
Service Disconnection at the $ 132.48 Charged By: Date: 4/18/2017 Objective: Recover Cost Pole/Weatherhead Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance / Full Cost: 132.48$
Municipal Serv.
Electric Reconnection Fee - $ 87.98 Charged By: Date: 4/18/2017 Objective: Recover Cost Normal Reconnection per account Electric Penalty
O. No.: Prop 26 Exception: 1,2,5
Collected By: O. Date:
Finance / Full Cost: 87.98$
Municipal Serv.
Electric Disconnection fee $ 87.98 Charged By: Date: 4/18/2017 Objective: Recover Cost per account Electric Penalty
O. No.: Prop 26 Exception: 1,2,5
Collected By: O. Date:
Finance / Full Cost: 87.98$
Municipal Serv.
Reference: CMD 109 4 - 6 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Service Fee Customer- $ 92.50 Charged By: Date: 4/18/2017 Objective: Recover Cost Owned Equipment Problem per hour Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: 175.95$
Electric replacement/ $ 175.95 Charged By: Date: 4/18/2017 Objective: Recover Cost reconnection fee due to per account Electric Penalty
meter tampering/illegal Fee to fix O. No.: Prop 26 Exception: 1,2,5 access meter plus Collected By: O. Date:
two (2) times Finance / Electric Rules and Full Cost: 175.95$ estimated cost Municipal Serv. Regulations #7B
of services
used
Service Removal $ Actual cost Charged By: Date: Objective: Recover Cost Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: Actual CostReference: CMD 109 4 - 7 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Engineering Plan Check - Electric $ 300.15 Charged By: Date: 4/18/2017 Objective: Recover Cost For reviewing (per sheet) - Includes 3 checks per sheet Electric Encroachment Permit plans O. No.: Prop 26 Exception: 2,3 that have no electric
Collected By: O. Date: services request.
Finance Full Cost: 300.15$ For conflicts with existing electric infrastructure.
Engineering Plan Check - Electric $ 44.51 Charged By: Date: 4/18/2017 Objective: Recover Cost For reviewing (per sheet) - 4th and subsequent per sheet Electric Encroachment Permit plans review O. No.: Prop 26 Exception: 2,3 that have no electric Collected By: O. Date: services request.
Finance Full Cost: 44.51$ For conflicts with existing electric infrastructure.
Time of Use Meter Installation - $ 284.63 Charged By: Date: 4/18/2017 Objective: Recover Cost Residential per meter Electric
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance / Full Cost: 284.63$
Municipal Serv.
Time of Use Meter Installation - $ 569.25 Charged By: Date: 4/18/2017 Objective: Recover Cost Non-Residential per meter Electric
O. No.: Prop 26 Exception: 2,3
Collected By: O. Date:
Finance / Full Cost: 569.25$
Municipal Serv.
Reference: CMD 109 4 - 8 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ELECTRIC UTILITY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Field Marking-Electric $ 132.48 Charged By: Date: 4/18/2017 Objective: Recover Cost Up to 50 ft of excavation Electric
O. No.: Prop 26 Exception: 2
Collected By: O. Date:
Finance Full Cost: 132.48$
Field Marking-Electric $ 87.98 Charged By: Date: 4/18/2017 Objective: Recover Cost Over 50 ft. of excavation per each Electric
additional O. No.: Prop 26 Exception: 2
50 ft of Collected By: O. Date:
excavation Finance Full Cost: 87.98$
Field Marking-Fibe
r $ 132.48 Charged By: Date: 4/18/2017 Objective: Recover Cost Up to 50 ft of excavation Electric
O. No.: Prop 26 Exception: 2
Collected By: O. Date:
Finance Full Cost: 132.48$
Field Marking-Fibe
r $ 87.98 Charged By: Date: 4/18/2017 Objective: Recover Cost Over 50 ft. of excavation per each Electric
additional O. No.: Prop 26 Exception: 2
50 ft of Collected By: O. Date:
excavation Finance Full Cost: 87.98$
Reference: CMD 109 4 - 9 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
4 - 10
Municipal Fee Schedule
Finance
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / ADMINISTRATIVE SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGE D
FEE -------- - ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DAT E
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Annual Operating Budget $ 0.20 Charged By: Date: 6/10/2008 Objective: Recover Cost See City Manager Financial Report per page Finance page 2
Res. No.: 08-7525 Prop 26 Exception: 1,2
$ 3.00 Collected By:
per CD Finance Full Cost: N/A
Comprehensive Annual $ 0.20 Charged By: Date: 6/10/2008 Objective: Recover Cost See City Manager Financial Report per page Finance page 2
Res. No.: 08-7525 Prop 26 Exception: 1,2
$ 3.00 Collected By:
per CD Finance Full Cost: N/A
Capital Improvement Budget/ $ 0.20 Charged By: Date: 6/10/2008 Objective: Recover Cost See City Manager Five Year Financial Plan per page Finance page 2
Res. No.: 08-7525 Prop 26 Exception: 1,2
$ 3.00 Collected By:
per CD Finance Full Cost: N/A
Combination of : $ 0.20 Charged By: Date: 6/10/2008 Objective: Recover Cost See City Manager Annual Operating Budget per page Finance page 2
Financial Report; Res. No.: 08-7525 Prop 26 Exception: 1,2 Comprehensive Annual $ 3.00 Collected By:
Financial Report; per CD Finance Full Cost: N/A
Capital Improvement Budget/
Five Year Financial Plan
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 5 - 1 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / ADMINISTRATIVE SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGE D
FEE -------- - ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DAT E
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Transient Occupancy Tax $ 9.5% Charged By: Date: 6/30/1992 Objective: Tax For occupancy in any of rent Finance
hotel/motel, each transient O. No.: 1640 Prop 26 Exception: * N/A is subject to this tax (less allowable Collected By: O. Date: 6/30/1992 for the rent charged by the exemptions) Finance Full Cost: N/A hotel/motel operator.
CFD 2010-1 Mello-Roos Ta
x $ 2.0% Charged By: Date: 5/11/2010 Objective: Tax
Base Special Tax which of rent Finance
equals 2% of the rent that is Res. No.: 10-7727 Prop 26 Exception: * N/A used in the calculation of the Collected By:
Transient Occupancy Tax for (less allowable Finance Full Cost: N/A Hotel Property. exemptions)
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Commercial Enterprises $ See Schedule Finance
100 attached O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Manufacturing/Industrial $ See Schedule Finance
Enterprises 300 attached O. No.: 1721 Prop 26 Exception: * N/A Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Ta
x
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Professional $ See Schedule Finance
200 attached O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 45.00 Charged By: Date: 7/7/1992 Objective: Tax Companies conducting per year Finance
business in the City without O. No.: 1721 Prop 26 Exception: * N/A a fixed place of business Collected By: O. Date: 10/27/1998 Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E (* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.)
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 5 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Delinquent payment of $ 100% Charged By: Date: 8/18/1981 Objective: Tax business certificate fees - 30 of appropriate Finance
days after due date business O. No.: 1721 Prop 26 Exception: 5 license fee Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Ta
x
Change of name, address or $ 9.00 Charged By: Date: 4/18/2017 Objective: User Fee business type as shown on per each update Finance
current certificate O. No.: 1721 Prop 26 Exception: 1,2 Collected By: O. Date: 10/27/1998
Finance / Full Cost: 9.00$
Municipal Serv. -
Business Ta
x
Business Certificate Info. Charged By: Date: 6/11/1996 Objective: User Fee Each Document $ 0.20 Finance
Public Records Act per page O. No.: Prop 26 Exception: 1,2 Collected By: O. Date:
Special Request $ Actual cost Finance / Full Cost: 11.18$ (Research Required) of compilation Municipal Serv. -
Business Ta
x
Duplicate business certificate $ 9.00 Charged By: Date: 4/18/2017 Objective: User Fee each Finance
O. No.: 1721 Prop 26 Exception: 1,2
Collected By: O. Date: 10/27/1998
Finance / Full Cost: 9.00$
Municipal Serv. -
Business Tax
Reference: CMD 109 5 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate $ 45.00 Charged By: Date: 7/7/1992 Objective: Tax Ambulance Service flat fee Finance
per business O. No.: 1721 Prop 26 Exception: * N/A
plus O. Date: 10/27/1998
$ 15.00 Collected By: Full Cost: N/A
additional fee Finance /
for each Municipal Serv. -
ambulance Business Tax
Business Tax Certificate $ 150.00 Charged By: Date: 7/7/1992 Objective: Tax Carnivals per day Finance
O. No.: 1721 Prop 26 Exception: * N/A
Carnival concession, ride, $ 15.00 Collected By: O. Date: 10/27/1998 sideshow per each Finance / Full Cost: N/A
per day Municipal Serv. -
Business Tax
Business Tax Certificate $ 150.00 Charged By: Date: 7/7/1992 Objective: Tax Circus per day Finance
O. No.: 1721 Prop 26 Exception: * N/A
Circus concession, ride, $ 15.00 Collected By: O. Date: 10/27/1998 sideshow per each Finance / Full Cost: N/A
per day Municipal Serv. -
Business Tax
Business Tax Certificate $ 150.00 Charged By: Date: 10/13/1998 Objective: Tax Promotional Show per day Finance
O. No.: 1721 Prop 26 Exception: * N/A
Promotional Show concession,$ 15.00 Collected By: O. Date: 10/27/1998 ride, sideshow per each Finance / Full Cost: N/A
per day Municipal Serv. -
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate $ 150.00 Charged By: Date: 7/7/1992 Objective: Tax Escort Service per year Finance
(funerals, personal escort O. No.: 1721 Prop 26 Exception: * N/A services, etc.) Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Ta
x
Business Tax Certificate $ 150.00 Charged By: Date: 7/7/1992 Objective: Tax Intracity bus service and per year Finance
public transportation O. No.: 1721 Prop 26 Exception: * N/A Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Ta
x
Business Tax Certificate $ 15.00 Charged By: Date: 7/7/1992 Objective: Tax See Police Department Parade route vendor per parade Finance Fee Schedule for O. No.: 1721 Prop 26 Exception: * N/A Parade route vendor Collected By: O. Date: 10/27/1998 ID fee.
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate $ 150.00 Charged By: Date: 7/7/1992 Objective: Tax Pawnshop per year Finance
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 15.00 Charged By: Date: 7/7/1992 Objective: Tax Taxicab Company per cab Finance
per year Police O. No.: 1721 Prop 26 Exception: * N/A Taxicab Stand $ 90.00 Collected By: O. Date: 10/27/1998 per year Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $5 . 2 2 Charged By: Date: 6/5/2007 Objective: Tax Rental units (3+) per unit Finance Rental unit = $3.00
- Apartments per year O. No.: 1721 Prop 26 Exception: * N/A 3.40.350 $3 . 0 0 Collected By: O. Date: 10/27/1998
- Hotels/Motels per unit Finance / Full Cost: N/A Surcharge = $2.22 per year Municipal Serv. - 3.40.360
Business Tax
Business Tax Certificate $ 23.00 Charged By: Date: 7/7/1992 Objective: Tax Business providing regular per vehicle Finance
service by use of vehicles O. No.: 1721 Prop 26 Exception: * N/A including catering trucks Collected By: O. Date: 10/27/1998 Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate $0 . 7 5 Charged By: Date: 7/7/1992 Objective: Tax Public market operators per booth Finance
per day O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 79.00 Charged By: Date: 7/7/1992 Objective: Tax Vending Operators per year Finance
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 60.00 Charged By: Date: 7/7/1992 Objective: Tax Automatic coin-operated each per year Finance
amusement machines and O. No.: 1721 Prop 26 Exception: * N/A peep shows Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 30.00 Charged By: Date: 7/7/1992 Objective: Tax Juke Box each per year Finance
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate $8 . 0 0 Charged By: Date: 7/7/1992 Objective: Tax Billiard and pool tables per table or Finance
Ping-pong tables lane per year O. No.: 1721 Prop 26 Exception: * N/A $ 80.00 Collected By: O. Date: 10/27/1998
Bowling or Tenpin lanes flat fee for 11 Finance / Full Cost: N/A or more tables Municipal Serv. -
or lanes per Business Tax
year
Business Tax Certificate $ See Schedule Charged By: Date: 7/7/1992 Objective: Tax Merry-go-rounds, shooting 200 attached Finance
galleries, golf ranges, and O. No.: 1721 Prop 26 Exception: * N/A skating rinks Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Theaters $ 23.00 Finance
1-500 seats or stalls per year O. No.: 1721 Prop 26 Exception: * N/A 501-1000 seats or stalls $ 30.00 Collected By: O. Date: 10/27/1998 per year Finance / Full Cost: N/A
1001 or more seats or stalls $ 45.00 Municipal Serv. -
Business Tax
Business Tax Certificate $ See Schedule Charged By: Date: 7/7/1992 Objective: Tax Nightclubs, cabarets, etc. 100 attached Finance
O. No.: 1639 Prop 26 Exception: * N/A
Collected By: O. Date: 7/7/1992
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Class I entertainment license $ 263.00 Finance
without a valid theater or night first year O. No.: 1721 Prop 26 Exception: * N/A club license for same location. Collected By: O. Date: 10/27/1998 $ 210.00 Finance / Full Cost: N/A
annual renewal Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Class II entertainment license $ 90.00 Finance
first year O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
$ 75.00 Finance / Full Cost: N/A
annual renewal Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Class III entertainment license $ 413.00 Finance
without a valid theater or night first year O. No.: 1721 Prop 26 Exception: * N/A club license for same location. Collected By: O. Date: 10/27/1998 $ 360.00 Finance / Full Cost: N/A
annual renewal Municipal Serv. -
Business Tax
Business Tax Certificate $ See Schedule Charged By: Date: 7/7/1992 Objective: Tax Massage establishment 200 attached Finance
O. No.: 1685 Prop 26 Exception: * N/A
Collected By: O. Date: 2/27/1996
Finance / City Code Section: Full Cost: N/A
Municipal Serv. - 5.40.040
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate $ 45.00 Charged By: Date: 7/7/1992 Objective: Tax Contractors - State licensed per year Finance
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 150.00 Charged By: Date: 10/13/1998 Objective: Tax Detective Agency Finance
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 225.00 Charged By: Date: 7/7/1992 Objective: Tax Itinerant merchant per year, Finance
max 190 days O. No.: 1721 Prop 26 Exception: * N/A
Peddlers $ 113.00 Collected By: O. Date: 10/27/1998
per year Finance / Full Cost: N/A
plus $5.00 Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Secondhand Dealer $ 150.00 Finance
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate $ 113.00 Charged By: Date: 10/13/1998 Objective: Tax Principal solicitors certificate per year Finance
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate $ 0.20 per page Charged By: Date: 6/12/2012 Objective: Tax Handbill distributors for public Finance
(Distributors located in the Res. No.: 08-7525 Prop 26 Exception: * N/A City of Santa Clara & holding Collected By:
a valid business certificate Finance / Full Cost: N/A See page 2 Copy Machine are exempt from this fee). $ 0.05 per page Municipal Serv. - usage.
Restricted address list for
for employee Business Tax
handbill distribution.
Business Tax Certificate $ See Schedule Charged By: Date: 7/7/1992 Objective: Tax Miniature golf course 200 attached Finance
O. No.: 1721 Prop 26 Exception: * N/A
Collected By: O. Date: 10/27/1998
Finance / Full Cost: N/A
Municipal Serv. -
Business Tax
Business Tax Certificate Charged By: Date: 7/7/1992 Objective: Tax Christmas tree lots $ 150.00 Finance
Merchants with an plus all other O. No.: 1721 Prop 26 Exception: * N/A established place of business applicable fees Collected By: O. Date: 10/27/1998 in the City of Santa Clara per lot per sale Finance / City Code Section: Full Cost: N/A Municipal Serv. - 5.15.030
Business Tax
Public $0.20 per page
Employee $0.05 per page
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Address List
Reference: CMD 109 5 - 12 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Pumpkin sales lots $ 150.00 Finance
plus all other O. No.: 1721 Prop 26 Exception: * N/A applicable fees Collected By: O. Date: 10/27/1998
per lot per sale Finance / City Code Section: Full Cost: N/A Municipal Serv. - 5.15.030
Business Ta
x
Business Tax Certificate Charged By: Date: 10/13/1998 Objective: Tax Seasonal items sales lots $ 150.00 Finance
plus all other O. No.: 1721 Prop 26 Exception: * N/A applicable fees Collected By: O. Date: 10/27/1998
per lot per sale Finance / City Code Section: Full Cost: N/A Municipal Serv. - 5.15.030
Business Ta
x
Business Tax Certificate Charged By: Date: 6/9/2009 Objective: User Fee Regulated business - see Bingo $ 50.00 Finance O. No.: 1658 & 1729 Police Dept. Fee Schedule O. Date: 6/28/1994 & Prop 26 Exception: * N/A for additional applicable Collected By: 4/6/1999 fees.
Finance / City Code Section: Full Cost: N/A
Municipal Serv. - 5.75.180 & 5.75.050 Business tax amount set Business Tax by SCCC 5.75.180
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 5 - 13 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Amplified Music Permit $ 57.00 Charged By: Date: 4/18/2017 Objective: User Fee Finance
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Finance City Code Section: Full Cost: 57.00
9.05.060 (c) (2)
City Flag $ 95.00 Charged By: Date: 6/15/2010 Objective: Recover Cost City Council Approved Policy Finance
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Finance Full Cost: 95.00$
Block Party Request $ No Charge Charged By: Date: 6/15/2010 Objective: User Fee Fee waived to promote Finance community spirit
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Finance Full Cost: 67.41$
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) 7/20/1993
Reference: CMD 109 5 - 14 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Utility service deposit - $ Estimated Charged By: Date: 8/9/1966 Objective: Recover Cost commercial, industrial and three (3) Municipal Serv.
residential month's usage O. No.: Prop 26 Exception: 1,2 based on Collected By: O. Date:
history and/or Finance / Full Cost: As Calculated
projected load Municipal Serv.
Service turn-on fee Charged By: Date: 4/18/2017 Objective: Recover Cost (for each service) Municipal Serv.
O. No.: Prop 26 Exception: 1,2
Electric $ 30.00 Collected By: O. Date:
Finance / Full Cost: 47.00$
Water $ 30.00 Municipal Serv.
Billing service charge for late $ 10.00 Charged By: Date: 6/12/2012 Objective: Recover Cost payment - residential, or 1.5% Municipal Serv. Penalty
commercial and industrial per account O. No.: 1.5% on outstanding whichever greater Collected By: O. Date: Prop 26 Exception: 1,2,5 balance or $10.00, Finance / whichever is greater.
Municipal Serv. Full Cost: 14.35$
Delinquent Service Letter $ 34.00 Charged By: Date: 4/18/2017 Objective: Recover Cost (48 hour notice) per account Municipal Serv. Penalty
O. No.:
Collected By: O. Date: Prop 26 Exception: 1,2
Finance /
Municipal Serv. Full Cost: 34.00$
Reference: CMD 109 5 - 15 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Fees for the verification of $ 114.00 Charged By: Date: 4/18/2017 Objective: Recover Cost electric meter address per address Municipal Serv.
(aka "ring out") plus O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
$ 2.00 Finance / Full Cost: 114.00$
per meter Municipal Serv.
Utility Billing Splitting $ 68.00 Charged By: Date: 4/18/2017 Objective: Recover Cost or Combining Accounts per account Municipal Serv.
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance / Full Cost: 121.00$
Municipal Serv.
Payment Default Fee $ 31.00 Charged By: Date: 4/18/2017 Objective: Recover Cost (includes NSF check, Municipal Serv.
direct payment decline, O. No.: Prop 26 Exception: 1,2,5 default credit card charge) Collected By: O. Date:
Finance / Full Cost: 32.00$
Municipal Serv.
Municipal Services
$0 . 2 0 Charged By: Date: 6/12/2001 Objective: Recover Cost Fee waived for the most Information per page Municipal Serv. recent three-month period.
Each document O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: 18.76$
Special Request $ Actual cost Finance /
(Request Research) of compilation Municipal Serv.
Reference: CMD 109 5 - 16 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
FINANCE / MUNICIPAL SERVICES RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
FULL COST FACTOR
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
10-day letter for house meter $ 100.00 Charged By: Date: 4/18/2017 Objective: Recover Cost for up to 10 units Municipal Serv.
O. No.: Prop 26 Exception: 1,2
For each full or partial $ 12.00 Collected By: O. Date: Full cost recovery for this fee increment of 10 thereafter Finance / Full Cost: 100.00$ is $20 per UFS Phase 2 Municipal Serv. page 5 of 53, FIN 62
Meter reading more than $ 60.00 Charged By: Date: 4/18/2017 Objective: Recover Cost once per month Municipal Serv.
1st meter per location O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
For each additional meter $ 3.00 Finance / Full Cost: 60.00$ reading at same location Municipal Serv.
Delinquent Reconnect Fee $ 75.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per account Municipal Serv. Penalty
O. No.:
Collected By: O. Date: Prop 26 Exception: 1,2
Finance /
Municipal Serv. Full Cost: 75.00$
Reference: CMD 109 5 - 17 Form: FEEFORM Revised: May 2011 1 $ 15 1 $ 15 1-3 $ 15
2-5 30 2-3 30 4-20 45
6-10 70 4-6 70 21-30 65
11-15 90 7-10 90 31-50 100
16-20 115 11-20 115 51-75 135
21-25 175 21-25 175 76-100 175
26-30 225 26-35 225 101-125 225
31-40 280 36-40 280 126-175 280
41-55 330 41-45 330 176-225 330
56-75 380 46-50 380 226-300 380
76-100 460 51-55 460 301-400 460
101+ 500 56+ 500 401+ 500
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
Employee(s) Employee(s)
"
"
"
"
Employee(s)
"
"
Schedule No. 300 -
Manufacturing
CITY OF SANTA CLARA MUNICIPAL FEE SCHEDULE Attachment - Finance/Municipal Services Division
July 1, 2017
Schedule No. 200 -
Professional
Schedule No. 100 -
Commercial/Industrial
5 - 18
Municipal Fee Schedule
Fire
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Training Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Training Fee- $ 703.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 703.00$
Training Fee- $ 987.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 987.00$
Training Fee- $ 703.00 Charged By: Date: 4/18/2017 Objective: Recover Cost First Aid (4 Hours) Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 703.00$
CPR – Adult Heart Saver
(4 Hours)
CPR – Adult/Pediatric
Heart Saver (6 Hours)
Per 6
Persons
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Per 6
Persons
Per 6
Persons
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.)
FULL COST FACTOR
Reference: CMD 109 6 - 1 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Training Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Training Fee- $ 2,535.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 2,535.00$
Training Fee- $ 2,535.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 2,535.00$
Training Fee- $ 316.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 316.00$
Training Fee- $ 599.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 599.00$
ACLS Recognition (2
Days)
PALS/ACLS Re-
Recognition (2 Days)
Per 6
Persons
Limit 12
Persons
Per 6
Persons
Limit 20
Persons
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) General Fire and Rescue
Training (4 Hours)
Fire Extinguisher
Training (2 Hours) Does
not include fees for fire
extinguisher use.
Reference: CMD 109 6 - 2 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Training Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Training Fee- $ 599.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 599.00$
Training Fee- $ 1,163.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 1,163.00$
Training Fee- $ 316.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Training User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A Fire/Training
Full Cost: 316.00$
Training Fee- $ 316.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Self Contained Breathing Fire/Training User Fee
Apparatus (2 Hours) R. No.: 17-8423
Does not include fees for Collected By: R. Date: 4/18/2017 Prop 26 Exception: * N/A refilling air bottles. Fire/Training
Full Cost: 316.00$
Limit 12
Persons
Limit 20
Persons
Safety and Evacuation
Lecture (2 Hours)
Limit 12
Persons
(* Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Hose and Nozzle
Training (4 Hours) Does
not include fees for
equipment use.
Haz-Mat First Responder
Awareness Training (8
hours)
Limit 12
Persons
Reference: CMD 109 6 - 3 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Rental Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Facility Rental Fee: $ 49.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 49.00$
Facility Rental Fee: $ 123.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 123.00$
Facility Rental Fee: $ 62.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 62.00$
Facility Rental Fee: $ 31.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 31.00$
Training Center:
Classroom (Limit 80
persons)
Training Center:
Classroom (Limit 30
persons)
FULL COST FACTOR
Training Center:
Classroom (Limit 20
persons)
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Headquarters’
Conference Room
Rental
Reference: CMD 109 6 - 4 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Rental Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Facility Rental Fee: $ 49.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 49.00$
Facility Rental Fee: $ 79.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 79.00$
Equipment Rental Fee: $ 49.00 Charged By: Date: 4/18/2017 Objective: User Fee per day Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 49.00$
Equipment Rental Fee: $ 31.00 Charged By: Date: 4/18/2017 Objective: User Fee per day Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 31.00$
Training Center: Drill
Grounds/Tower
Training Center,
Apparatus Sump
Rental of Hose (2½”
and 1½”)
Rental of Nozzle (2½”
and 1½”)
Reference: CMD 109 6 - 5 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Rental Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Equipment Rental Fee: $ 12.00 Charged By: Date: 5/10/2016 Objective: User Fee per day Fire
R. No.: 16-8322 Prop 26 Exception: 4
Collected By: R. Date: 5/10/2016
Fire/Administration Full Cost: 12.42$
Equipment Rental Fee: $ 37.00 Charged By: Date: 4/18/2017 Objective: User Fee per day Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 37.00$
Equipment Rental Fee: $ 68.00 Charged By: Date: 4/18/2017 Objective: User Fee each Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 68.00$
Equipment Rental Fee: $ 55.00 Charged By: Date: 4/18/2017 Objective: User Fee per day Fire
R. No.: 17-8423 Prop 26 Exception: 4
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 55.00$
Fire Extinguisher (Dry
Chemical, 2A:10B:C)
Smoke Machine Fuel
(4 Liters)
Refilling 30 Minute Air
Bottles per bottle
Smoke Machine
(Does not include
smoke machine fuel)
Reference: CMD 109 6 - 6 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Rental Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Resource Fees: $ 423.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 423.00$
Resource Fees: $ 140.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 140.00$
Resource Fees: $ 423.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 423.00$
Resource Fees: $ 423.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 423.00$
Stand-by (One Engine
for Permitted Activity)
Fire Watch (Per
Person)
Water Clean-up –
Industrial and
Commercial (1 Engine)
Water Clean-up –
Industrial and
Commercial (1 Truck)
Reference: CMD 109 6 - 7 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Rental Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Resource Fees: $ 140.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 140.00$
Resource Fees: $ 140.00 Charged By: Date: 4/18/2017 Objective: User Fee per hour Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire/Administration Full Cost: 140.00$
Water Clean-up –
Industrial and
Commercial (1 Haz-
Mat)
Water Clean-up –
Industrial and
Commercial (1
Battalion Chief)
Reference: CMD 109 6 - 8 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS $ 712.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Permit Center Full Cost: 915.00$
$ 987.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
Special Hazard Systems R. No.: 17-8423
(including Halon, Wet and Dry Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Chemical Systems, CO2, Fire/Prevention
Foam and Similar Systems). Full Cost: 987.00$
$ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 564.00$
$ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
Automatic Fire Extinguishing
Systems:
Hood & Duct
Automatic Fire Sprinkler
Systems - New:
Alternate Materials and
Methods Review
Automatic Fire Extinguishing
Systems:
FULL COST FACTOR
1-49 heads
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 6 - 9 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 1,408.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,408.00$
$ 2,046.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,818.00$
$ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 564.00$
$ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 564.00$
50-100 heads
Automatic Fire Sprinkler
Systems - New:
101-200 heads
Automatic Fire Sprinkler
Systems - New:
Automatic Fire Sprinkler
Systems - New:
Each additional 100
heads (>200 heads)
Automatic Fire Sprinkler
Systems - Existing:
1-49 heads, no
calculations
Reference: CMD 109 6 - 10 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
$ 1,408.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,408.00$
$ 1,550.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,550.00$
$ 2,042.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,113.00$
1-49 heads, with
calculations
Automatic Fire Sprinkler
Systems - Existing:
101-200 heads, with
calculations
50-100 heads, with
calculations
Automatic Fire Sprinkler
Systems - Existing:
Automatic Fire Sprinkler
Systems - Existing:
50-100 heads, no
calculations
Automatic Fire Sprinkler
Systems - Existing:
Reference: CMD 109 6 - 11 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 280.00$
Battery Systems $ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
Building Plans $ 246.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Permit Center User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Permit Center
Full Cost: 246.00$
Carnivals and Fairs $ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per event Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
Automatic Fire Sprinkler
Systems - Existing:
25% of Building
Department Fee
Each additional 100
heads (>200 heads)
Reference: CMD 109 6 - 12 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Change of Address $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 280.00$
$ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 423.00$
$ 540.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 540.00$
$ 634.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Permit by Rule Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 634.00$
Christmas Tree Lots or Sale
Areas at Retail Businesses
Closure of an Onsite
Hazardous Waste Treatment
System:
Conditionally Authorized
and Conditionally Exempt
Closure of an Onsite
Hazardous Waste Treatment
System:
Reference: CMD 109 6 - 13 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Compressed Gas Installation $ 987.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per system Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 987.00$
Cooking Oil Storage Tanks $ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
Demolition of Building $ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 423.00$
$ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 423.00$
Demolition of Fire Protection
System
Reference: CMD 109 6 - 14 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 2,113.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,113.00$
Emergency Alarm Systems: $ 1,408.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,408.00$
Emergency Alarm Systems: $ 1,971.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,971.00$
Engineering Referrals $ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost (Parcel maps, public roads, Fire User Fee
public fire hydrants) R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 423.00$
New System or
Modification – No Gas
Detection
New System or
Modification including
Gas Detection
Emergency Responder Radio
Coverage System
Reference: CMD 109 6 - 15 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 746.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
$ 140.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 140.00$
Exhibit and Trade Shows $ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
Explosives and Blasting Agents $ 664.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 664.00$
See Chapter 33 of the
Fire Code
Environmental Study Initial
Review (includes 6 hours of
review)
Environmental Study each
additional hour after initial
review
Reference: CMD 109 6 - 16 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
$ 1,408.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,408.00$
$ 2,113.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,113.00$
$ 2,818.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,818.00$
21-40 Devices
1-20 Devices
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:
101-200 Devices
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:
41-100 Devices
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:
Reference: CMD 109 6 - 17 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 280.00$
$ 1,127.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,127.00$
$ 1,691.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,691.00$
$ 2,394.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,394.00$
Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):
21-40 Devices
Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):
Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):
1-20 Devices
41-100 Devices
Fire Alarm Systems (Non-high
rise and R-2 Occupancies:
Each additional 50 devices
(>200 devices)
Reference: CMD 109 6 - 18 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 3,099.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,099.00$
$ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 423.00$
Fire Pump Installation $ 2,036.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,818.00$
$ 987.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 987.00$
Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):
101-200 Devices
Fire Alarm Systems with pre-
wire inspection required (high
rise and R-2 occupancies):
Each additional 50 devices
(>200 devices)
High-Rise Fire Protection
Water Storage Tank (1st tank)
Reference: CMD 109 6 - 19 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 280.00$
$ 2,071.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,818.00$
$ 1,291.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,408.00$
$ 1,691.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,691.00$
Hazardous Material
Tool/Equipment Installation
Facility/Site
Hazardous Materials Closure
Plan:
Equipment
High-Rise Fire Protection
Water Storage Tank (each
additional tank)
Hazardous Materials Closure
Plan:
Reference: CMD 109 6 - 20 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 1,905.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,971.00$
Liquefied Petroleum Gases $ 987.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Installation Per Tank Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 987.00$
$ 2,818.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
≤ 2,500 Square feet R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 2,818.00$
$ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
> 2,500 Square feet R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 280.00$
High-Piled Combustible
Storage
Methane Venting and
Detection Systems
See Chapter 32 of the
Fire Code
Methane Venting and
Detection Systems
Reference: CMD 109 6 - 21 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost 1,000.00 Fire/Prevention User Fee
Deposit R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 564.00$
Ovens: $ 987.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 987.00$
Ozone Generator $ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per system Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
Open Burnings (open flames,
torches, candles)
Industrial Baking and/or
Drying per oven
Reference: CMD 109 6 - 22 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Community Development $ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Department Referrals Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 423.00$
$ 987.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 987.00$
$ 1,691.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,691.00$
Refrigeration System $ 703.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 703.00$
Pyrotechnics Special Effects
Proximal to Audience
Public Fireworks Display and
Pyrotechnic Special Effects
Use
Reference: CMD 109 6 - 23 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Roadways: $ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Access Control and Fire User Fee
Traffic Calming Devices R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 564.00$
Smoke Control System $ 3,523.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 3,523.00$
Standpipe Systems: $ 987.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 987.00$
Wet, Combination and
Horizontal
Reference: CMD 109 6 - 24 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 1,267.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,267.00$
$ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 564.00$
$ 1,267.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,267.00$
$ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 564.00$
Storage Tanks - Hazardous
Materials:
Underground and Above
Ground Tank Removals
(1st tank)
Underground and Above
Ground Tank Removals (each
additional tank after the 1st)
Storage Tanks - Hazardous
Materials:
Underground and Above
Ground Tank Installations
(each additional tank after the
1st)
Underground and Above
Ground Tank
Installations (1st tank)
Reference: CMD 109 6 - 25 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 703.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 703.00$
$ 618.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
$ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 280.00$
First Tent, Canopy or Air
Supported Structure
Each additional temporary
membrane structure and tent
Underground and Above
Ground Tank Modifications
Reference: CMD 109 6 - 26 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 1,361.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,408.00$
$ 1,971.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,971.00$
$ 703.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
Repairs R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 703.00$
Underground Fire Service
Systems:
Fire Sprinkler System (no
hydrants)
Underground Fire Service
Systems:
Fire Sprinkler System
with Hydrants
Underground Fire Service
Systems:
Reference: CMD 109 6 - 27 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Construction Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 844.00$
$ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 423.00$
$ 1,089.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire/Prevention User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Fire/Prevention
Full Cost: 1,127.00$
Automatic Fire Protection
System for Spray Booths
Automatic Fire Sprinkler
Systems:
Automatic Fire Sprinkler
Systems:
Residential 13D - Initial
Submittal Plan Review
Required
Residential 13D - Secondary
Submittal - No Plan Review
Required
Reference: CMD 109 6 - 28 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
FULL COST FACTOR
Amusement Park
Buildings
Covered and Open Mall
Buildings
Exhibit and Trade Shows
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Aerosol products
Reference: CMD 109 6 - 29 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 140.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 140.00$
Operational Permit: $ 185.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
Cellulose Nitrate Storage
Combustible Dust
Producing Operations
Explosives
Cutting and Welding
Reference: CMD 109 6 - 30 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Operational Permit: $ 140.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 140.00$
Operational Permit: $ 237.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Combustible Storage - Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
Operational Permit: $ 271.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Dry Cleaning Plants Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 322.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fruit Ripening Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
Combustible Fiber
Storage
Including tires in excess
of 2,500 cubic feet
Reference: CMD 109 6 - 31 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 140.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Hot Work Operations Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 140.00$
Operational Permit: $ 140.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Lumber Yard - Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 140.00$
High Piled Combustible
Storage
More than 100,000
board feet
Reference: CMD 109 6 - 32 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Operational Permit: $ 140.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Magnesium Working - Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 140.00$
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Miscellaneous combustible Fire User Fee
storage R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 179.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Organic Coatings Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 179.00$
Operational Permit: $ 90.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 90.00$
More than 10 lbs. per
work day
Ovens (Industrial baking
or Drying)
Reference: CMD 109 6 - 33 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Operational Permit: $ 136.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Places of Assembly Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 136.00$
Operational Permit: $ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Private Fire Hydrants Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 564.00$
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Pyroxylin Plastics Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Reference: CMD 109 6 - 34 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Operational Permit: $ 185.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Refrigeration Equipment Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 166.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Repair Garages Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 166.00$
Operational Permit: $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Rooftop Heliports Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Operational Permit: $ 166.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 166.00$
Spraying or Dipping
Operations
Reference: CMD 109 6 - 35 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Operational Permit: $ 253.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Tire Rebuilding Plants Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 253.00$
Operational Permit: $ 392.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
Operational Permit: $ 185.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Wood Products – Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
Storage in excess of
200 cubic feet
Waste Handling Facilities
Reference: CMD 109 6 - 36 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits - Haz-Mat RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
$ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
Corrosives: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Gases - more than 200 cu ft Annual Fire User Fee
Liquids - more than 55 gal R. No.: 17-8423
Solids - more than 500 lbs Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
FEE DETAIL
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FULL COST FACTOR
OBJECTIVE
Combustible and Flammable
Materials (any amount)
Compressed Gases (any
amount)
Reference: CMD 109 6 - 37 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits - Haz-Mat RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FULL COST FACTOR
OBJECTIVE
Cryogens: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Oxidizer - more than 60 gal Full Cost: 211.00$
Highly Toxic Materials $ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
Liquefied Petroleum Gas (LPG): $ 271.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Any Amount Annual Fire User Fee
SCMFEC Section 105.6.7 R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Non-flammable - more than 60
gal
Corrosive, Flammable or toxic -
any amount
Reference: CMD 109 6 - 38 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits - Haz-Mat RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FULL COST FACTOR
OBJECTIVE
Organic Peroxides: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
Oxidizing Materials: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Except: Class 1 Oxidizers Full Cost: 211.00$
Pyrophoric Materials: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
Radioactive Materials: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See SCMFEC Sec. 105.6.48 Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
Liquids and Solids - any
amount
Except: Class V Organic
Peroxides
Gases, Liquids and Solids -
any amount
Gases - more than 504 cubic
feet
Liquids and Solids - any
amount
Reference: CMD 109 6 - 39 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Operational Permits - Haz-Mat RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FULL COST FACTOR
OBJECTIVE
Toxic Materials: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
Unstable (Reactive) Materials: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
Water Reactive Materials: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
Gases, Liquids and Solids -
any amount
Except: Class 1 Water
Reactive Materials
Gases, Liquids and Solids -
any amount
Except: Class 1 Unstable
Reactive Materials
Gases, Liquids and Solids -
any amount
Reference: CMD 109 6 - 40 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / State Mandated RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS High-Rise Structures: $ 325.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per floor Fire User Fee
Annual R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 844.00$
R-1/R-2 Occupancies: $ 35.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per unit Fire User Fee
Annual R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 35.00$
High-Rise R-1 Occupancies $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Buildings 75 feet in
height or greater
Multi-Family
Occupancies- 3 or more
units; hotels and motels.
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
per floor
Reference: CMD 109 6 - 41 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / State Mandated RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 165.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per inspection Fire User Fee
25 or fewer residents R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
$ 276.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per inspection Fire User Fee
More than 25 residents R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 703.00$
$ 232.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
9 to 14 occupants R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
$ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
15 or more occupants R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 564.00$
Licensed Care Inspections:
Annual
Licensed Care Pre-Inspection
Fee:
Licensed Care Pre-Inspection
Fee: (Annual)
Licensed Care Inspections:
Annual
Reference: CMD 109 6 - 42 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / State Mandated RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Commercial Day Care (E3) $ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Adult Day Care (I4) Fire User Fee
7-49 persons R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Commercial Day Care (E3) $ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Adult Day Care (I4) Fire User Fee
50-149 persons R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
Commercial Day Care (E3) $ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Adult Day Care (I4) Fire User Fee
150+ persons R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 564.00$
Reference: CMD 109 6 - 43 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / State Mandated RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
School $ 423.00 Charged By: Date: 4/18/2017 Objective: Recover Cost 1-250 students Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
School $ 703.00 Charged By: Date: 4/18/2017 Objective: Recover Cost 251-500 students Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 703.00$
School $ 1,408.00 Charged By: Date: 4/18/2017 Objective: Recover Cost > 500 students Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,408.00$
Reference: CMD 109 6 - 44 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / State Mandated RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Jails $ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 564.00$
Hospitals $ 1,691.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,691.00$
Reference: CMD 109 6 - 45 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Inspection Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS $ 90.00 Charged By: Date: 4/18/2017 Objective: Recover Cost One time fee Fire User Fee
Home Business R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 159.00$
$ 104.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 104.00$
$ 175.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 175.00$
$ 247.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 247.00$
Light/Ordinary Hazard
Occupancy:
Light/Ordinary Hazard
Occupancy:
FULL COST FACTOR
5,001 to 20,000 square
feet
0 to 1,500 square feet
Light/Ordinary Hazard
Occupancy:
1,501 to 5,000 square feet
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Light/Ordinary Hazard
Occupancy:
Reference: CMD 109 6 - 46 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Inspection Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 280.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
$ 351.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 351.00$
Extra Hazard Occupancy: $ 468.00 Charged By: Date: 4/18/2017 Objective: Recover Cost 0 to 5,000 square feet Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 484.00$
Extra Hazard Occupancy: $ 705.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 729.00$
Light/Ordinary Hazard
Occupancy:
50,001 square feet or
more
5,001 to 20,000 square
feet
20,001 to 50,000 square
feet
Light/Ordinary Hazard
Occupancy:
Reference: CMD 109 6 - 47 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Inspection Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Extra Hazard Occupancy: $ 871.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 871.00$
Extra Hazard Occupancy: $ 1,364.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,364.00$
Multi-Story Structures: $ 211.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per floor Fire User Fee
Annual R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 211.00$
Miscellaneous Inspections $ 140.00 Charged By: Date: 4/18/2017 Objective: Recover Cost per hour Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 140.00$
Buildings 4 or more
stories in height not
classified as a high-rise
20,001 to 50,000 square
feet
50,001 square feet or
more
Reference: CMD 109 6 - 48 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Penalty Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS False Alarm Responses: $ 298.00 Charged By: Date: 4/18/2017 Objective: Penalty Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire Full Cost: 298.00$
Double Fees Charged By: Date: 7/14/2009 Objective: Penalty Fire
R. No.: 09-7653 Prop 26 Exception: 1,2,5
Collected By: R. Date: 7/14/2009
Fire Full Cost: N/A
Plan Resubmittal Fee: $ 423.00 Charged By: Date: 4/18/2017 Objective: Penalty Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire Full Cost: 423.00$
Plan Revision Fee: $ 280.00 Charged By: Date: 4/18/2017 Objective: Penalty Fire
R. No.: 17-8423 Prop 26 Exception: 1,2
Collected By: R. Date: 4/18/2017
Fire Full Cost: 280.00$
After third time in 180
day period per response
Failure to Obtain Construction
Permit
Each subsequent
resubmittal after first
request to resubmit
Each subsequent
revision or addendum
after initial submittal
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 6 - 49 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Penalty Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Re-Inspection Fee: $ 359.00 Charged By: Date: 4/18/2017 Objective: Penalty Fire
R. No.: 17-8423 Prop 26 Exception: 1,2,3
Collected By: R. Date: 4/18/2017
Fire Full Cost: 359.00$
Double Fees Charged By: Date: 7/14/2009 Objective: Penalty Fire
R. No.: 09-7653 Prop 26 Exception: 1,2,5
Collected By: R. Date: 7/14/2009
Finance Full Cost: N/A
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty A105.1.4 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 275.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty A109.2.2 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 275.00$
Failure to comply with
order, notices and/or
tags issued by the Fire
Department
For failure to cancel
appointment, work not
ready for inspection or
more than three re-
inspections
Non-renewal of Operational
(Annual) Permit:
30 days after renewal
notice
Failure to pay annual fire
permit fees
Reference: CMD 109 6 - 50 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Penalty Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Administative Citation Penalty: $ 160.00 Charged By: Date: 5/10/2016 Objective: Penalty 109.1 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 160.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 304.1.1C Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 106.00 Charged By: Date: 5/10/2016 Objective: Penalty 304.1.1R Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 106.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 401.1 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Failure to report
emergencies
Other fire code violations
Storage accumulation of
rubbish and/or
combustible vegetation-
Commercial
Storage accumulation of
rubbish and/or
combustible vegetation-
Residential
Reference: CMD 109 6 - 51 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Penalty Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Administative Citation Penalty: $ 160.00 Charged By: Date: 5/10/2016 Objective: Penalty 401.3.1 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 160.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 407.1 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 213.00 Charged By: Date: 5/10/2016 Objective: Penalty 508.5.4 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 213.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 901.6 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Obstruction and control
of emergency access
Failure to maintain fire
protection equipment
Failure to maintain
Hazardous Materials
Management Plan in
approved location
Intentional or negligent
false alarm - each
occurrence
Reference: CMD 109 6 - 52 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Penalty Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 1004.1 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 1028.3 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2205.2 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2701.5.1 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Failure to file Hazardous
Materials Management
Plan
Obstruction of means of
egress
Exceeding maximum
occupant load
Failure to maintain
vehicle fuel dispensing
system
Reference: CMD 109 6 - 53 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Penalty Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2701.5.2 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2701.6 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2703.1.1 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2703.2.6 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Failure to maintain
hazardous materials
systems
Exceeding maximum
allowable quantity of
hazardous materials
Failure to file Hazardous
Materials Closure Plan
Failure to update
Hazardous Materials
Inventory Statement
Reference: CMD 109 6 - 54 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Penalty Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2703.2.8 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2703.3.3.1 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2703.5 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2703.9.8 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Failure to label
hazardous materials
system
Failure to report
hazardous material
release
Failure to separate
incompatible hazardous
materials
Failure to provide
seismic protection for
hazardous material
systems
Reference: CMD 109 6 - 55 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Penalty Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 2704.2.2 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
Administative Citation Penalty: $ 266.00 Charged By: Date: 5/10/2016 Objective: Penalty 3301.1.2 Fire
R. No.: 16-8322 Prop 26 Exception: 5
Collected By: R. Date: 5/10/2016
Finance Full Cost: 266.00$
$ 198.00 Charged By: Date: 4/18/2017 Objective: Penalty Fire
R. No.: 17-8423 Prop 26 Exception: 1,2,3
Collected By: R. Date: 4/18/2017
Fire Full Cost: 198.00$
$ 198.00 Charged By: Date: 4/18/2017 Objective: Penalty Fire
R. No.: 17-8423 Prop 26 Exception: 1,2,3
Collected By: R. Date: 4/18/2017
Fire Full Cost: 198.00$
Expired Construction Permit
Plan Review Reactivation Fee
Failure to maintain
secondary containment
for hazardous materials
Unlawful possession of
fireworks
Expired Construction Permit
Reactivation Fee
Reference: CMD 109 6 - 56 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / Document Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Microfilm Copies $ 22.00 Charged By: Date: 5/10/2016 Objective: Recover Cost R. No.: 16-8322 Prop 26 Exception: 1,2
Collected By: R. Date: 5/10/2016
Full Cost: 22.36$
Photocopies $ 0.20 Charged By: Date: 7/14/2009 Objective: Recover Cost R. No.: 09-7653 Prop 26 Exception: 1,2
Collected By: R. Date: 7/14/2009
Full Cost: 0.21$
Photographs $ 22.00 Charged By: Date: 5/10/2016 Objective: Recover Cost R. No.: 16-8322 Prop 26 Exception: 1,2
Collected By: R. Date: 5/10/2016
Full Cost: 22.36$
plus actual
cost
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
plus actual
cost
Reference: CMD 109 6 - 57 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / CUPA Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS $ 271.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
Used Oil Only R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
$ 271.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
$ 377.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
$ 492.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 509.00$
Hazardous Waste Generator
Fees:
Hazardous Waste Generator
Fees:
Hazardous Waste Generator
Fees:
FULL COST FACTOR
Less than 100 Kg per
year
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Hazardous Waste Generator
Fees:
Less than 5 tons per
year
5 tons to less than 25
tons per year
Reference: CMD 109 6 - 58 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / CUPA Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 564.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 564.00$
$ 1,361.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
CalARP Facility R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,408.00$
$ 1,634.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
CalARP Facility R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,691.00$
$ 1,634.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
CalARP Facility R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,691.00$
25 tons and greater
California Accidental Release
Program (CALARP) Fees:
California Accidental Release
Program (CALARP) Fees:
Operating Permit
Program 2
Operating Permit
Program 1
California Accidental Release
Program (CALARP) Fees:
Operating Permit
Program 3
Hazardous Waste Generator
Fees:
Reference: CMD 109 6 - 59 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / CUPA Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 1,691.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
RMP Review Fee R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,691.00$
$ 903.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 987.00$
$ 655.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 703.00$
$ 278.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
Onsite treatment of Hazardous
Waste Annual Fee - Highest
Tier:
Conditionally Authorized
Conditionally Exempt
California Accidental Release
Program (CALARP) Fees:
Onsite treatment of Hazardous
Waste Annual Fee - Highest
Tier:
Permit by Rule
Onsite treatment of Hazardous
Waste Annual Fee - Highest
Tier:
Reference: CMD 109 6 - 60 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / CUPA Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ Charged By: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.
CUPA Oversight Fee R. No.: 09-7653
Collected By: R. Date: 7/14/2009 Prop 26 Exception: 1,2,3 Finance
Full Cost: N/A
$ Charged By: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.
Underground Tank Fee R. No.: 09-7653
Collected By: R. Date: 7/14/2009 Prop 26 Exception: 1,2,3 Finance
Full Cost: N/A
$ Charged By: Date: 7/14/2009 Objective: User Fee Set by State Collected by Fire City and paid to State.
R. No.: 09-7653
Collected By: R. Date: 7/14/2009 Prop 26 Exception: 1,2,3 Finance
Full Cost: N/A
$ Charged By: Date: 4/21/2015 Objective: User Fee Set by State Collected by Fire City and paid to State.
R. No.: 15-8226
Collected By: R. Date: 4/21/2015 Prop 26 Exception: 1,2,3 Finance
Full Cost: N/A
As
Determined
by State
Regulation
Aboveground Petroleum
Storage Act
As
Determined
by State
Regulation
State of California Annual
Surcharges:
As
Determined
by State
Regulation
State of California Annual
Surcharges:
As
Determined
by State
Regulation
State of California Annual
Surcharges:
State of California Annual
Surcharges:
Califonia Accidental
Release Prevention
Program
Reference: CMD 109 6 - 61 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / CUPA Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 351.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 351.00$
$ 397.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 410.00$
$ 533.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 551.00$
More than 10,000 gallon
capcity
Aboveground Petroleum
Storage Tank Program
<1,320 gallon capacity
1,320 - 10,000 gallon
capacity
Aboveground Petroleum
Storage Tank Program
Aboveground Petroleum
Storage Tank Program
Reference: CMD 109 6 - 62 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / CUPA Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 608.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
First Tank R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,021.00$
$ 202.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
Each additional tank R. No.: 17-8423
Collected By: R.Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 280.00$
$ 148.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
1-3 chemicals R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 423.00$
$ 148.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
4-6 chemicals R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 564.00$
Hazardous Materials Business
Plan
Underground Hazardous
Materials Tank:
Underground Hazardous
Materials Tank:
Hazardous Materials Business
Plan
Reference: CMD 109 6 - 63 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
Fire / CUPA Fees RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- RESOLUTION
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
$ 148.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
7-9 chemicals R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 844.00$
$ 148.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
10-15 chemicals R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,127.00$
$ 148.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
16-21 chemicals R. No.: 17-8423
Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 1,408.00$
$ 35.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fire User Fee
Each additional chemical R. No.: 17-8423
> 21 chemical Collected By: R. Date: 4/18/2017 Prop 26 Exception: 1,2,3 Finance
Full Cost: 35.00$
Hazardous Materials Business
Plan
Hazardous Materials Business
Plan
Hazardous Materials Business
Plan
Hazardous Materials Business
Plan
Reference: CMD 109 6 - 64 Form: FEEFORM Revised: May 2011 Municipal Fee Schedule
Library
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
LIBRARY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Overdue fines covering $ 1.50 Charged By: Date: 6/11/2013 Objective: Penalty Fine is assessed to interlibrary loans per item Library encourage prompt return per day O. No.: Prop 26 Exception: 5 of the materials.
Collected By: O. Date:
Library Full Cost: 1.66$
Overdue fines - all other items $ 0.25 Charged By: Date: 4/22/2014 Objective: Penalty Fine is assessed to excluding children's books per item per day Library encourage prompt return O. No.: Prop 26 Exception: 5 of the materials.
$ 8.00 Collected By: O. Date:
maximum per Library Full Cost: 1.27$
item
Replacement for library $ Current costs Charged By: Date: 4/18/2017 Objective: Recover Cost Processing fee incurred to materials of item Library recover some of the cost of
+processing fee: O. No.: Prop 26 Exception: 1,2 replacing library materials. $ 5.00 Collected By: O. Date: Two tier system:
or Library Full Cost: 51.00$ $5.00 for paperbacks and $ 15.00 $15.00 all other items
Replacement fee for lost $ 2.00 Charged By: Date: 4/22/2014 Objective: Recover Cost Cost recovery for replacing or damaged library card Library a lost or damaged library card; O. No.: Prop 26 Exception: 1,2 1st replacement at no charge.
Collected By: O. Date:
Library Full Cost: 3.00$
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 7 - 1 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
LIBRARY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Fee for borrowing materials $ 8.50 Charged By: Date: 6/11/2013 Objective: Recover Cost from other libraries per item Library
(interlibrary loan) O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Library Full Cost: 85.00$
Replacement fee for lost $ 115.00 Charged By: Date: 6/10/2003 Objective: Recover Cost Replacement fee is Link+ materials borrowed Library collected by the library and from other libraries O. No.: Prop 26 Exception: 1,2 transferred to the owning Collected By: O. Date: library; fee amount is
Library Full Cost: 126.74$ determined by Link+ consortium
Overdue fine for Link+ $ 1.00 Charged By: Date: 6/14/2011 Objective: Penalty Overdue fine amount is materials borrowed from per item per day Library determined by the Link+ other libraries O. No.: Prop 26 Exception: 5 consortium Collected By: O. Date:
Library Full Cost: 1.65$
Collection Agency Fee $ 14.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Fee is assessed to recover Library Penalty the cost charged by
O. No.: collection agency to the
Collected By: O. Date: Prop 26 Exception: 1,2 library for resolving Library delinquent accounts
Full Cost: 14.00$
Reference: CMD 109 7 - 2 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
LIBRARY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Overdue Fines for $ 15.00 Charged By: Date: 6/12/2012 Objective: Penalty Fine is assessed to Portable Electronic Devices Library encourage prompt return O. No.: of portable electronic
Collected By: O. Date: Prop 26 Exception: 5 devices.
Library
Full Cost: 16.54$
Food and beverage usage $ 19.00 Charged By: Date: 4/22/2014 Objective: Recover Cost To be assessed when fee - Library Community Library User Fee groups using library Rooms O. No.: community rooms wish to
Collected By: O. Date: Prop 26 Exception: 4 serve food and/or Library beverages. Reduced dollar
Full Cost: 34.00$ amount and redirected
to room set up fee.
Room Rental Processing $ 50.00 Charged By: Date: 4/22/2014 Objective: Recover Cost and Set Up Fee Library User Fee
O. No.: Prop 26 Exception: 4
Collected By: O. Date:
Library Full Cost: 85.00$
Fee for using library $ 50.00 Charged By: Date: 6/11/2013 Objective: User Fee In addition to labor costs, meeting room per hour Library there are indirect costs of Two hour O. No.: Prop 26 Exception: 4 using the facility: water, minimum Collected By: O. Date: electricity, equipment,
Library Full Cost: N/A furniture, etc.
Reference: CMD 109 7 - 3 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
7 - 4
Municipal Fee Schedule
Parks and Recreation
SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
SITE PREPARATION
Casket Burial, Install Single Burial Vault, $ 1,301.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Single Depth Grave Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 2,292.00$
Finance
Casket Burial, Install Single Burial Vault, $ 1,301.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Double Depth Grave Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 2,387.00$
Finance
Casket Burial, Install Companion Vault, $ 1,301.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Double Depth Grave Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 2,864.00$
Finance
Casket Burial, Pre-Installed Companion $ 1,301.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Double Depth Grave Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 2,148.00$
Finance
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E (Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.)
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Reference: CMD 109 8 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Casket Burial, Install Small Burial Vault $ 1,301.00 Charged by: Date: 4/18/2017 Objective: Recover Cost (infants/babies), Single Depth Grave Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 2,005.00$
Finance
Casket Burial in a grave, with existing $ 1,301.00 Charged by: Date: 4/18/2017 Objective: Recover Cost cremation(s) Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 2,435.00$
Finance
Cremation burial in a Grave $ 1,146.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 1,146.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Cremation Placement in a Niche $ 788.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 788.00$
Finance
Casket Placement in a Crypt $ 1,301.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 1,862.00$
Finance
Disinternment of Casket from a Grave $ 1,041.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 2,721.00$
Finance
Disinternment of Casket from a Niche $ 1,041.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 1,575.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Disinternment of Cremation from a grave $ 573.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 573.00$
Finance
Disinternment of Cremation from a niche $ 143.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 143.00$
Finance
$ 3,628.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 3,628.00$
Finance
Disinter and reinter casket into same grave
to make Grave extra depth (Vault not
included)
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Installation of a monobar, emblem, flower $ 430.00 Charged by: Date: 4/18/2017 Objective: Recover Cost vase, or ring on a crypt (each) Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 430.00$
Finance
Installation of a flower vase and ring on a $ 143.00 Charged by: Date: 4/18/2017 Objective: Recover Cost niche Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 143.00$
Finance
Installation of a niche plaque $ 143.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 143.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Flat marker (10"x18" or 12"x24") set into $ 143.00 Charged by: Date: 4/18/2017 Objective: Recover Cost earth Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 143.00$
Finance
Flat marker (20"x28") set into $ 179.00 Charged by: Date: 4/18/2017 Objective: Recover Cost earth Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 179.00$
Finance
Flat marker (10"x18" or 12"x24") set into $ 430.00 Charged by: Date: 4/18/2017 Objective: Recover Cost concrete frame, with or w/o vase cups Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 430.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
$ 286.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 286.00$
Finance
$ 143.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 143.00$
Finance
Single (34" x 12") or Double (46" x 12")
Upright Monument Foundation
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Remove and dispose of marker and frame
Reference: CMD 109 8 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
OTHER SERVICES
Vault Disposal $ 208.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Casket Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 286.00$
Finance
Vault Disposal $ 47.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cremation Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 47.00$
Finance
Transfer of interment rights $ 143.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 143.00$
Finance
City to repurchase interment rights $ 143.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 143.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Burial Permit Filing Fee $ 286.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 286.00$
Finance
PERPETUAL CARE (ENDOWMENT)
Casket - Flat Marker Area Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
Non-Resident $ 943.00 O. No.: Prop 26 Exception: N/A Collected By: O. Date:
Resident $ 833.00 Cemetery & Full Cost: -$
Finance
Casket - Upright Monument Area Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
Non-Resident $ 943.00 O. No.: Prop 26 Exception: N/A Collected By: O. Date:
Resident $ 833.00 Cemetery & Full Cost: -$
Finance
Casket - Baby Land, South Baby Land, Charged by: Date: 4/18/2017 Objective: Recover Cost Children's Garden Cemetery
O. No.: Prop 26 Exception: N/A
Non-Resident $ 65.00 Collected By: O. Date:
Cemetery & Full Cost: -$
Resident $ 65.00 Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Cremation - Flat Marker Area Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
Non-Resident $ 943.00 O. No.: Prop 26 Exception: N/A Collected By: O. Date:
Resident $ 833.00 Cemetery & Full Cost: -$
Finance
Cremation - Upright Monument Area Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
Non-Resident $ 943.00 O. No.: Prop 26 Exception: N/A Collected By: O. Date:
Resident $ 833.00 Cemetery & Full Cost: -$
Finance
Babyland, South Babyland, Charged by: Date: 4/18/2017 Objective: Recover Cost Children's Garden Cemetery
O. No.: Prop 26 Exception: N/A
Non-Resident $ 65.00 Collected By: O. Date:
Cemetery & Full Cost: -$
Resident $ 65.00 Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Hourly Rate (Personnel) $ 143.00 Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 143.00$
Finance
Custom $ Actual Cost Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: Actual Cost
Finance
Saturday Service (Hourly Rate) $ Actual Cost Charged by: Date: 4/18/2017 Objective: Recover Cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: Actual Cost
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / CEMETERY RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE COMMENTS
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) ** Plus sales tax.
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Chapel rental non-resident $ 286.00 Charged by: Date: 4/18/2017 Objective: Recover Cost (two hours of use) Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Chapel rental resident Cemetery & Full Cost: 286.00$
(two hours of use) - No Fee Finance
BURIAL MATERIALS
Burial Materials processing Fee $ 286.00 ** Charged by: Date: 4/18/2017 Objective: Recover Cost All materials are priced at actual cost Cemetery
O. No.: Prop 26 Exception: N/A
Collected By: O. Date:
Cemetery & Full Cost: 286.00$
Finance
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 8 - 12 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
Community Recreation Center Charged By: Date: 4/18/2017 Objective: Recover Cost Full cost includes kitchen Room Rental Cost per hour Parks & Rec. Resident/private party use O. No.: Prop 26 Exception: 4 Hourly Staff costs may be
Auditorium with kitchen $ 289.00 Collected By: O. Date: charged to resident/private party in Auditorium w/o kitchen Parks & Rec. Full Cost: 307.00$ addition to the room rental fee. $ 230.00
Community Recreation Center Charged By: Date: 4/18/2017 Objective: Recover Cost Hourly Staff costs are charged Room Rental Cost per hour Parks & Rec. to resident/private party in addition to O. No.: Prop 26 Exception: 4 the room rental fee.
Meeting rooms: Collected By: O. Date: $42.00 resident group/for Music, A&C, Diablo, Preschool Parks & Rec. Full Cost: 127.00$ non profit meeting Mission $ 44.00
Park Building Room Rentals $ 64.00 Charged By: Date: 4/18/2017 Objective: Recover Cost $60.00 resident/private party Machado, Maywood, Bowers per hour Parks & Rec.
Agnews, Montague O. No.: Prop 26 Exception: 4
Collected By: O. Date:
Non-profit group use $ 25.00 Parks & Rec. Full Cost: 352.00$ $25.00 resident group/ per meeting for non-profit mtg.
Lick Mill Park $ 128.00 Charged By: Date: 4/18/2017 Objective: Recover Cost $120.00 resident/private party Room Rentals per hour Parks & Rec.
O. No.: Prop 26 Exception: 4
Non-profit group use $ 25.00 Collected By: O. Date: $25.00 resident group/ per meeting Parks & Rec. Full Cost: 338.00$ for non-profit mtg.
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Reference: CMD 109 8 - 13 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Central Park $ 137.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Resident group private party flat rate per area Parks & Rec.
Pavilion Group Picnic Area per day O. No.: Prop 26 Exception: 4 Collected By: O. Date:
Parks & Rec. Full Cost: 142.00$
Central Park
$ 137.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Resident group private party flat rate per area Parks & Rec.
Arbor Center Picnic Area per day O. No.: Prop 26 Exception: 4 Collected By: O. Date:
Parks & Rec. Full Cost: 142.00$
Hourly Staff (As Needed)
$ 30.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Hourly Staff costs are charged assigned to Facility per hour Parks & Rec. to resident/private party in addition to (Per Hour/per person)
O. No.: Prop 26 Exception: 4 the room rental fee.
Collected By: O. Date: (Personnel $ per hour).
Parks/Maintenance Staff Parks & Rec. Full Cost: $ rate x hrs.
Receptionist
Reference: CMD 109 8 - 14 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Senior Citizens Center Charged By: Date: 4/18/2017 Objective: Recover Cost Hourly Staff costs are charged Cost per hour Parks & Rec. to resident/private party in addition to Auditorium and Kitchen O. No.: Prop 26 Exception: 4 the room rental fee. $ 228.00 Collected By: O. Date: Kitchen and Auditorium Parks & Rec. Full Cost: 277.00$ rented together.
Resident group private party
Senior Citizens Center $ 66.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Hourly Staff costs are charged per hour Parks & Rec. to resident/private party in addition to Meeting Rooms O. No.: Prop 26 Exception: 4 the room rental fee.
Collected By: O. Date:
Non-profit group use $ 18.00 Parks & Rec. Full Cost: 277.00$ $25.00 resident group/ per meeting for non-profit meeting
Youth Activity Center Charged By: Date: 4/18/2017 Objective: Recover Cost Hourly Staff costs are charged Room Rental Fees Cost per hour Parks & Rec. to resident/private party in addition to O. No.: Prop 26 Exception: 4 the room rental fee.
Gymnasium $ 169.00 Collected By: O. Date: Resident Youth Sports Groups Parks & Rec. Full Cost: 266.00$ are exempt
Youth Activity Center Cost per hour Charged By: Date: 4/18/2017 Objective: Recover Cost Hourly Staff costs are charged Room Rental Fees Parks & Rec. to resident/private party in addition to O. No.: Prop 26 Exception: 4 the room rental fee.
$ 113.00 Collected By: O. Date: Resident Youth Sports Groups Parks & Rec. Full Cost: 132.00$ are exempt
Reference: CMD 109 8 - 15 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Fund-raising events at City $ 15% Charged By: Date: 6/15/2010 Objective: Recover Cost All fund raising events for facilities of gross receipts Parks & Rec. private parties are charged or rental fees O. No.: Prop 26 Exception: 4 15% of all gross receipts (whichever Collected By: O. Date: or rental fee; whichever is greater) Parks & Rec. Full Cost: $ Varies is greater Ball fields and turf areas Cost per hour Charged By: Date: 4/18/2017 Objective: Recover Cost Resident Youth Sports Groups reservations Parks & Rec. are exempt
O. No.: Prop 26 Exception: 4
Day use $ 62.00 Collected By: O. Date:
per hr. fee Parks & Rec. Full Cost: 326.00$ Hourly staff costs are charged in addition to facility fee.
Ball fields and turf areas Cost per hour Charged By: Date: 4/18/2017 Objective: Recover Cost Resident Youth Sports Groups reservations Parks & Rec. are exempt
O. No.: Prop 26 Exception: 4
Evening use $ 89.00 Collected By: O. Date:
per hr. fee Parks & Rec. Full Cost: 326.00$ Hourly staff costs are charged in addition to facility fee.
Baseball and softball field Cost per hour Charged By: Date: 4/18/2017 Objective: Recover Cost Resident Youth Sports Groups preparation Parks & Rec. are exempt
Flat fee O. No.: Prop 26 Exception: 4
$ 124.00 Collected By: O. Date:
Parks & Rec. Full Cost: 326.00$
Reference: CMD 109 8 - 16 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Central Park $ 9.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Per hour rate/resident; Tennis Court reservations per hour Parks & Rec. prime time reserved (resident) O. No.: Prop 26 Exception: 4
$ 11.00 Collected By: O. Date: Per hour rate/non-resident; per hour Parks & Rec. Full Cost: $ rate x hrs. prime time reserved (non-resident)
$ 4.50 Per hour rate/resident;
non-prime time
$ 5.50
per hour Per hour rate/non-resident;
(non-resident, non-prime time
non-prime time) To be implemented with
Fall 2018 Activity Guide.
Cost per booking
City Plaza Park $ 119.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Residents only; Gazebo Parks & Rec. private wedding
O. No.: Prop 26 Exception: 4
Collected By: O. Date:
Parks & Rec. Full Cost: 123.00$
Cost per hour
Recreation Cancellation Fee $ 44.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Cancellation notice given less for Park Buildings, Parks & Rec. than 7 days in advance Picnic Areas O. No.: Prop 26 Exception: 4
Collected By: O. Date:
Parks & Rec. Full Cost: 46.00$
Reference: CMD 109 8 - 17 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Cost per hour
Youth Soccer Park $ 85.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Resident Youth Sports Groups Game Field Parks & Rec. are exempt
Or Practice Field O. No.: Prop 26 Exception: 4
Day Use - per field / per hr. Collected By: O. Date: Hourly staff costs are charged in Parks & Rec. Full Cost: 332.00$ addition to facility fees.
Cost per hour
Youth Soccer Park
$ 135.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Resident Youth Sports Groups Game Field Parks & Rec. are exempt
Or Practice Field O. No.: Prop 26 Exception: 4
Night use - per field / per hr. Collected By: O. Date: Hourly staff costs are charged in Parks & Rec. Full Cost: 352.00$ addition to facility fees.
Youth Soccer Park
$ 129.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Resident Youth Sports Groups Game Field Preparation Parks & Rec. are exempt
O. No.: Prop 26 Exception: 4
Per field/per day Collected By: O. Date: Hourly staff costs are charged in Fields 1 and 3 only Parks & Rec. Full Cost: 134.00$ addition to facility fees.
Reference: CMD 109 8 - 18 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Charged By:
Field Prep - Football $ 607.00 Parks & Rec. Date: 4/18/2017 Objective: Recover Cost Resident Youth Sports Groups are exempt
One time fee Collected By: O. No.: Prop 26 Exception: 4 Parks & Rec. O. Date:
Full Cost: 628.00$
$ 62.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Amplified Music Parks & Rec.
O. No.: Prop 26 Exception: 4 Resident Youth Sports Groups per event Collected By: O. Date: are exempt
Parks & Rec. Full Cost: 64.00$
Teen Center $ 169.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Resident Youth Groups Room Rental Parks & Rec. are exempt
O. No.: Prop 26 Exception: 4 Hourly Staff costs are charged Multi-Purpose Room Collected By: O. Date: to resident/private party in addition to Parks & Rec. Full Cost: 288.00$ the room rental fee.
Teen Center
Room Rental Cost range Charged By: Date: 4/18/2017 Objective: Recover Cost Resident Youth Groups depending on Parks & Rec. are exempt
Meeting rooms priority (per hour) O. No.: Prop 26 Exception: 4 Hourly Staff costs are charged Arts and Crafts or Classroom $ 113.00 Collected By: O. Date: to resident/private party in addition to Conference Room Parks & Rec. Full Cost: 134.00$ the room rental fee.
Reference: CMD 109 8 - 19 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Special Event Cost range Charged By: Date: 4/18/2017 Objective: Recover Cost One time application Application Fee depending on Parks & Rec. processing fee per request; (Groups of 50 or more, priority (per hour) O. No.: Prop 26 Exception: 3 non-exclusive use of public Special Event on City Property $ 275.00 Collected By: O. Date: property based on Dept.
Parks & Rec. Full Cost: 282.00$ Head approval City Code 9.35060
Pools Cost range Charged By: Date: 4/18/2017 Objective: Recover Cost Cost per use amortized over Lifejacket Rental depending on Parks & Rec. 3 year period priority (per hour) O. No.: Prop 26 Exception: 3
$ 1.50 Collected By: O. Date: To be implemented in May 2018 Parks & Rec. Full Cost: 22.00$
Reference: CMD 109 8 - 20 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8427 APPROVED: 5/9/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95050 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Quimby Act (Single Fam) $ 31,804.11 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 31,804.11$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95050 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Quimby Act (Multi Fam) $ 24,566.50 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 24,566.50$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95050 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Mitigation Fee Act (Single Fam) $ 27,195.40 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 27,195.40$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95050 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Mitigation Fee (Multi Fam) $ 21,006.66 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 21,006.66$ year
Reference: CMD 109 8 - 21 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8427 APPROVED: 5/9/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95051 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Quimby Act (Single Fam) $ 34,182.34 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 34,182.34$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95051 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Quimby Act (Multi Fam) $ 26,403.48 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 26,403.48$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95051 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Mitigation Fee (Single Fam) $ 29,201.04 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 29,201.04$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95051 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Mitigation Fee (Multi Fam) $ 22,555.85 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 22,555.85$ year
Reference: CMD 109 8 - 22 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
PARKS & RECREATION / RECREATION RESOLUTION NUMBER: 17-8427 APPROVED: 5/9/2017
CHARGING
DEPT / DIV
---------
DESCRIPTION OF COLLECTING
FEE , RATE OR CHARGE DEPT / DIV COMMENTS
CURRENT
FEE
and
PERIOD
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
DATE FEE
LAST CHANGED
ORDINANCE
NUMBER & DATE
(if applicable)
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95054 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Quimby Act (Single Fam) $ 34,945.51 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 34,945.51$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95054 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Quimby Act (Multi Fam) $ 26,992.95 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 26,992.95$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95054 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Mitigation Fee (Single Fam) $ 29,844.64 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 29,844.64$ year
Residential Development Charged By: Res. No.: 17-8427 Objective: Impact Dev. Fee Per Muni Code 17.35.040 (b) & (c), Park Dedication In-Lieu Fees Parks & Rec. Date: 5/9/2017 a proposed fee based on annual ZIP Code 95054 O. No.: 1928 Prop 26 Exception: 6 independent fair market value Mitigation Fee (Multi Fam) $ 23,052.98 Collected By: O. Date: 6/24/2014 appraisal as of December 31 of each Engineering Full Cost: 23,052.98$ year
Reference: CMD 109 8 - 23 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
8 - 24
Municipal Fee Schedule
Police
SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS CAD report for legal $0 . 2 0 Charged By: Date: 6/10/2008 Objective: Recover Cost purposes per page Police
Per page Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:
Finance Full Cost: 0.21$
Dispatch service required
$ 131.00 Charged By: Date: 4/18/2017 Objective: Recover Cost for special events per hour Police
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: 132.00$
Off-duty employment:
Per current salary Charged By: Date: 6/6/2006 Objective: Recover Cost schedule plus Police
benefits and overhead O. No.: Prop 26 Exception: N/A
of 97.58% Collected By: O. Date:
Finance Full Cost: As calculated
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Per Public Records Act
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Reference: CMD 109 9 - 1 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Second Response Ordinance Per current salary Charged By: Date: 8/22/1990 Objective: Recover Cost schedule plus Police
benefits and overhead O. No.: 1849 Prop 26 Exception: 3 of 97.58% Collected By: O. Date: 11/24/2009
Finance Code Section 9.05.020 Full Cost: As calculated
Tow Drivers Charged By: Date: 4/18/2017 Objective: Recover Cost Does not include mandated Application $ 137.00 Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Other (specify): Full Cost: 137.00$ (Regulatory Fee) City Contract
ID Card Renewal/Replacement
Charged By: Date: 4/18/2017 Objective: Recover Cost
(for multiple applicants) $ 51.00 Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Other: Full Cost: 59.00$
Tow Driver Renewal
Charged By: Date: 4/18/2017 Objective: Recover Cost (Regulatory Fee) Renewal $ 45.00 Police
Prop 26 Exception: 3
Collected By: O. No.
Police Full Cost: 45.00$
(Regulatory Fee)
DOJ/FBI Live Scan fees
Reference: CMD 109 9 - 2 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Taxicab Company Charged By: Date: 4/18/2017 Objective: Recover Cost Does not include mandated Application $ 4,162.00 Police
Prop 26 Exception: 3
Collected By: O. No.:
Police O. Date: (Regulatory Fee)
Full Cost: 4,162.00$
Taxicab Company Renewal
$ 2,090.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
Prop 26 Exception: 3
Collected By: O. No.:
Police O. Date:
Full Cost: 2,090.00$
Taxicab Driver
Charged By: Date: 4/18/2017 Objective: Recover Cost Does not include mandated Application $ 147.00 Police
O. No.: 1713 Prop 26 Exception: 3
Collected By:
Police Full Cost: 147.00$
Taxicab Driver
Charged By: Date: 4/18/2017 Objective: Recover Cost
Renewal, Retest or $ 45.00 Police
Reinspection O. No.: 1713 Prop 26 Exception: 3
Collected By:
Police Full Cost: 45.00$
(Regulatory Fee)
DOJ/FBI Live Scan fees
DOJ/FBI Live Scan fees
(Regulatory Fee)
Reference: CMD 109 9 - 3 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Taxicabs Charged By: Date: 4/18/2017 Objective: Recover Cost Safety Inspection Fee $ 59.00 Police
O. No.: 1713 Prop 26 Exception: 3
Collected By:
Police Full Cost: 59.00$
Fingerprinting
Charged By: Date: 4/18/2017 Objective: Recover Cost Does not include mandated LiveScan $ 29.00 Police
(Sent to Department of Justice) per roll O. No.: Prop 26 Exception: 1,2 Collected By:
Police Full Cost: 29.00$
Fingerprinting
Charged By: Date: 4/18/2017 Objective: Recover Cost
Hard Card $ 39.00 Police
(Person takes card with them) per card O. No.: Prop 26 Exception: 1,2 Collected By: O. Date:
Police Full Cost: 39.00$
Police Reports
$0 . 2 0 Charged By: Date: 6/10/2008 Objective: Recover Cost per page Police
Res. No.: 08-7525 Prop 26 Exception: 1,2
Per page Collected By:
Police Full Cost: 0.21$
(Regulatory Fee)
(Regulatory Fee)
FBI/DOJ Live Scan fees
Does not include mandated
(Regulatory Fee)
FBI/DOJ Live Scan fees
Per Public Records Act
Reference: CMD 109 9 - 4 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Color Photographs $ Actual Cost Charged By: Date: 6/10/2008 Objective: Recover Cost 4" x 6" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:
Police Full Cost: Actual Cost
Color Photographs
$ Actual Cost Charged By: Date: 6/10/2008 Objective: Recover Cost 5" x 7" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:
Police Full Cost: Actual Cost
Color Photographs
$ Actual Cost Charged By: Date: 6/10/2008 Objective: Recover Cost 8" x 10" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:
Police Full Cost: Actual Cost
Color Photographs
$ Actual Cost Charged By: Date: 6/10/2008 Objective: Recover Cost 11" x 14" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:
Police Full Cost: Actual Cost
Actual cost of duplication
Actual cost of duplication
Actual cost of duplication
Actual cost of duplication
Reference: CMD 109 9 - 5 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Color Photographs $ Actual Cost Charged By: Date: 6/10/2008 Objective: Recover Cost 16" x 20" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:
Police Full Cost: Actual Cost
Color Photographs
$ Actual Cost Charged By: Date: 6/10/2008 Objective: Recover Cost 20" x 30" Police
Per copy Res. No.: 08-7525 Prop 26 Exception: 1,2
Travel Cost Collected By:
Police Full Cost: Actual Cost
Photo CD's
$3 . 0 0 Charged By: Date: 6/10/2008 Objective: Recover Cost per CD Police
Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:
Police Full Cost: 3.30$
PRA - no labor fee
Actual cost of duplication
See City Manager Schedule
Actual cost of duplication
Reference: CMD 109 9 - 6 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Concealed Weapon Permit $ 137.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Investigation Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 137.00$
Alarm Permit
$ 31.00 Charged By: Date: 4/18/2017 Objective: Penalty
Police
O. No.: 1748 Prop 26 Exception: 3
Collected By: O. Date: 2/15/2000
Police Full Cost: 35.00$
False Alarm Calls Charged By: Date: 4/18/2017 Objective: Recover Cost Police Penalty
Third false alarm $ 105.00 O. No.: 1735
Fourth false alarm ($25 penalty) $ 130.00 Collected By: O. Date: 6/1/1999 Prop 26 Exception: 1,2,5 Fifth & subsequent false $ 155.00 Finance
alarms ($50 penalty) Full Cost: 114.00$
False Alarm Calls
Charged By: Date: 4/18/2017 Objective: Recover Cost
Dispatch for a Holdup Alarm $ 105.00 Police Penalty
In addition to O. No.: 1735
false alarm fees Collected By: O. Date: 6/1/1999 Prop 26 Exception: 1,2,5 Finance
Full Cost: 114.00$
(Regulatory Fee)
(Regulatory Fee)
Does not include mandated
FBI/DOJ Live Scan fees
(Regulatory Fee)
Reference: CMD 109 9 - 7 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Residential Parking Permit $ 20.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Res. No.: 11-7815 Full Cost: 20.00$
Res. Date: 1/11/2011
Release of Stored Vehicles
$ 68.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Police Full Cost: 78.00$
Driving Under the Influence
Per current salary Charged By: Date: 6/15/1999 Objective: Recover Cost Emergency Response schedule plus Police
benefits and overhead Government Code Prop 26 Exception: 1,2 of 97.58% Collected By: Sections: 53150
Finance and 53154 Full Cost: As calculated
(Regulatory Fee)
(Regulatory Fee)
Reference: CMD 109 9 - 8 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Repo Fee $ 22.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
(Repossessed Vehicles) Government Code Prop 26 Exception: 1,2 Collected By: Section: 41612
Police Full Cost: 25.00$
Crime Analysis Reports $0 . 2 0 Charged By: Date: 6/10/2008 Objective: Recover Cost per page Police User Fee
Res. No.: 08-7525
Collected By: Prop 26 Exception: 1,2
Police
Full Cost: 0.21$
Per Public Records Act
Mandated by State Law
Reference: CMD 109 9 - 9 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
State Certified Massage $ 117.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Initial Registration Police User Fee
Res. No.: 15-8215
Collected By: Prop 26 Exception: 1,2
Police
Full Cost: 117.00$
State Certified Massage $ 39.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Annual Renewal Police User Fee
Res. No.: 15-8215
Collected By: Prop 26 Exception: 1,2
Police
Full Cost: 39.00$
Massage Owner Fee $ 547.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 547.00$
Massage Owner Fee
Charged By: Date: 4/18/2017 Objective: Recover Cost
(Renewal) Police
Permit Renewal Fee $ 352.00 O. No.: Prop 26 Exception: 3 Collected By: O. Date:
Police Full Cost: 352.00$
Complex fees are assessed
Does not include mandated
(Regulatory Fee)
(Regulatory Fee)
when additional research is
required for registration.
DOJ/FBI Live Scan fees
Reference: CMD 109 9 - 10 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Closing Out Sale $ 98.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: 1719 Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 98.00$
Solicitor/Peddler Charged By: Date: 4/18/2017 Objective: Recover Cost Police
Background Investigation $ 168.00 O. No.: 1718 Prop 26 Exception: 3 Collected By: O. Date:
Police Full Cost: 168.00$
Solicitor/Peddler Renewal
$ 45.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 45.00$
(Regulatory Fee)
(Regulatory Fee)
DOJ/FBI Live Scan fees
Does not include mandated
Reference: CMD 109 9 - 11 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Motor Funeral Escort - Initial $ 168.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 168.00$
Motor Funeral Escort - Renewal $ 45.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 45.00$
Private Security - Initial $ 168.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 168.00$
Private Security - Renewal $ 45.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 45.00$
Does not include mandated
DOJ/FBI Live Scan fees
Reference: CMD 109 9 - 12 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Pedi-Cab - Initial $ 168.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 168.00$
Pedi-Cab - Renewal $ 45.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 45.00$
VIN Verification Fee $ 20.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 20.00$
DOJ/FBI Live Scan fees
Does not include mandated
Reference: CMD 109 9 - 13 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Pawn/Secondhand Dealer $ 129.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: 1723 Prop 26 Exception: 3
Collected By: O. Date:
Police Full Cost: 129.00$
Pawn/Secondhand Dealer
Charged By: Date: 4/18/2017 Objective: Recover Cost (Regulatory Fee) (Renewal) Police
O.No.: Prop 26 Exception: 3
Renewal Fee $ 61.00 Collected By: O. Date:
Police Full Cost: 61.00$
Bingo Organization $ 801.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: 1729 Prop 26 Exception: 3
Collected By: O. Date: 3/16/1999 Full Cost: 801.00$
Police (Regulatory Fee)
DOJ/FBI Live Scan fees
DOJ/FBI Live Scan fees
(Regulatory Fee)
Does not include mandated
Does not include mandated
Reference: CMD 109 9 - 14 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Public Entertainment General Charged By: Date: 4/18/2017 Objective: Recover Cost Background Investigation $ 217.00 Police
(Includes one rolling fee) O. No.: 1748 Prop 26 Exception: 3 Collected By: O. Date: 2/15/2000
Police Full Cost: 217.00$
Public Entertainment General
Charged By: Date: 4/18/2017 Objective: Recover Cost
Rolling Fee $ 29.00 Police
(for additional employees) O. No.: 1748 Prop 26 Exception: 3 Collected By: O. Date: 2/15/2000
Police Full Cost: 29.00$
Does not include mandated
DOJ/FBI Live Scan fees
(Regulatory Fee)
Does not include mandated
DOJ/FBI Live Scan fees
Reference: CMD 109 9 - 15 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
Public Entertainment General Charged By: Date: 4/18/2017 Objective: Penalty Police
Fines for Violation (Infraction): O. No.: 1748 Prop 26 Exception: 5 1st Offense $ 133.00 Collected By: O. Date: 2/15/2000
Police Full Cost: 133.58$
Public Entertainment General Charged By: Date: 4/18/2017 Objective: Penalty Police
Fines for Violation (Infraction): O. No.: 1748 Prop 26 Exception: 5 2nd Offense $ 267.00 Collected By: O. Date: 2/15/2000
Police Full Cost: 267.15$
Public Entertainment General Charged By: Date: 4/18/2017 Objective: Penalty Police
Fines for Violation (Infraction): O. No.: 1748 Prop 26 Exception: 5 Subsequent Offenses $ 667.00 Collected By: O. Date: 2/15/2000 Police Full Cost: 667.92$
Reference: CMD 109 9 - 16 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
CD for legal purposes $3 . 0 0 Charged By: Date: 6/10/2008 Objective: Recover Cost per CD Police
Res. No.: 08-7525 Prop 26 Exception: 1,2
Collected By:
Police Full Cost: 3.30$
Clearance Letter
$ 12.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Police Full Cost: 14.00$
Citation Sign Off $ 10.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Police
Non-Santa Clara Citations Only O. No.: Prop 26 Exception: 1,2 Collected By: O. Date:
Police Full Cost: 10.00$
See City Manager Schedule
Reference: CMD 109 9 - 17 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
ANIMAL CONTROL
LICENSE FEES For owners who are 65 years
Dog License Fees Charged By: Date: 3/25/2010 Objective: Recover Cost of age or older, there is no Altered One Year $ 22.00 Silicon Valley User Fee license fee charged for the Altered Two Years $ 32.00 Animal Control Res. No. Penalty first animal. Fees will apply Altered Three Years $ 42.00 Authority SVACA 2010-1 to t he second and additional Unaltered One Year $ 100.00 Collected By: Res. Date: Prop 26 Exception: 3 animals for such owners.
Silicon Valley 3/25/2010
Cat License Fees
Animal Control Full Cost: N/A State law requires that dogs Altered One Year $ 10.00 Authority must be licensed by the age Altered Two Years $ 18.00 of (4) four months.
Altered Three Years $ 26.00
Unaltered One Year $ 50.00 Failure to license a dog by
the age of (4) four months,
Other License Fees
or within 30 days of
Replacement Tag $ 5.00 acquisition or within 30 days
Late (Delinquent) Fee - Licensing $ 50.00 of residency (for a new resident) or within 30 days of
Courtesy Fee $ 2.00 Charged By: Date: 3/28/2013 Fee collected to offset the cost of the expiration date of a Silicon Valley expenses for a new web based previously issued license will Animal Control Res. No. licensing program. The program be subject to the Authority SVACA 2013-2 simplifies the licens ing process for Late (Delinquent) Fee.
Collected By: Res. Date: animal owners and increases staff Silicon Valley 3/28/2013 efficiency. Service is optional. Dog licenses are not Animal Control Owners may still renew or license in transferable from one owner Authority person or by mail. to the next.
Reference: CMD 109 9 - 18 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
SHELTER SERVICES
Impound/Redemption Fees Charged By: Date: 3/25/2010 Objective: Recover Cost Includes animals Dogs and Cats Silicon Valley Penalty impounded for rabies Altered-1st Offense $ 35.00 Animal Control Res. No. quarantine.
Unaltered-1st Offense $ 100.00 Authorit y SVACA 2010-1 Prop 26 Exception: 3 Offenses accumulate Altered or Unaltered-2nd Offense $ 125.00 Collected By: Res. Date: through the life of the Altered or Unaltered-3rd Offense $ 175.00 Silicon Valley 3/25/2010 Full Cost: N/A animal.
Altered or Unaltered-4th Offense $ 205.00 Animal Control Authority
Other Domestic/Exotic
Large animal (horse, pig, etc.) $ 75.00
Small Animal (bird, rabbit, etc.) $ 28.00
Boarding Fees
per day or portion thereof:
Dogs and Cats $ 22.00
All Other Animals $ 11.00
ADOPTION FEES
Type of Animal
Charged By: Date: 3/25/2010 Objective: Recover Cost SVACA reserves the right Dog $ 150.00 Silicon Valley User Fee to deny adoptions in Cat $ 100.00 Animal Control Res. No. certain circumstances for Kitten (less than six months) $ 150.00 Author ity SVAC A 2010-1 Prop 26 Exception: 3 cause.
Rabbit $ 30.00 Collected By: Res. Date:
Small Animal $ 20.00 Silicon Valley 3/25/2010 Full Cost: N/A Bird $ 20.00 Animal Control
Dog Behavior Training Deposit $ 100.00 Authority
Reference: CMD 109 9 - 19 Form: FEEFORM Revised: May 2011 SUBMITTED BY DEPARTMENT / DIVISION:
POLICE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E
FEE DETAIL
OBJECTIVE
ANIMAL SURRENDER FEES
Dog/Cat $ 150.00 Charged By: Date: 3/24/2011 Objective: Recover Cost Other $ 40.00 Silicon Valley User Fee Animal Control
Authority Res. No. Prop 26 Exception: 3
SVACA 2011-2
Collected By: Res. Date: Full Cost: N/A
Disposal Silicon Valley 3/24/2011
Small Animals $ 25.00 Animal Control Dog/Cat/Rabbit $ 50.00 Authority
Dogs and others over 150 lbs. $ 125.00
TRAP FEES
No Daily Fees Charged By: Date: 3/27/2006 Objective: Recover Cost Maximum rental period on Refundable Deposit $ 100.00 Silicon Valley User Fee all traps is 2 weeks, unless Animal Control Res. No. extended by SVACA staff.
Authority SVACA 2006-2 Prop 26 Exception: 3
Collected By: Res. Date:
Silicon Valley 3/27/2006 Full Cost: N/A
Animal Control
Authority
OTHER FEES
Animal Establishment Fee $ 200.00 Charged By: Date: 3/27/2014 Objective: Recover Cost Animal Rescue Registration $ 25.00 Silicon Valley User Fee Keeping of Animal or Fowl Permi
t $ 50.00 Animal Control Res. No. Penalty
Dangerous Dog Fee $ 200.00 Authority SVACA 2014-1
Field Service Charge, per trip $ 50.00 Collected By: Res. Date: Prop 26 Exception: 3 Home Quarantine Fee $ 50.00 Silicon Valley 3/27/2014
Returned Check Charge $ 50.00 Animal Control Full Cost: N/A Lab Processing Fee $ 100.00 Authority Volunteer Materials Fee $ 35.00
Records Request Fee $ .20/page
Reference: CMD 109 9 - 20 Form: FEEFORM Revised: May 2011 EFFECTIVE 12/18/2016 CITY OF SANTA CLARA - PAY RATE SCHEDULE SCHEDULE B 8.185%* PUBLIC SAFETY POLICE - UNIT 2
1 2 3 4 5 6 7
RANGE MONTH HOURLY BI-WEEKLY MONTH HOURLY BI-WEEKLY MONTH HOURLY BI-WEEKLY MONTH HOURLY BI-WEEKLY MONTH HOURLY BI-WEEKLY MONTH HOURLY BI-WEEKLY MONTH HOURLY BI-WEEKLY RANGE 31 10117 58.367 4669.36 10619 61.263 4901.04 11154 64.350 5148.00 11712 67.569 5405.52 12295 70.933 5674.64 12606 72.727 5818.16 12912 74.492 5959.36 31 32 10370 59.827 4786.16 10887 62.810 5024.80 11430 65.942 5275.36 12002 69.242 5539.36 12606 72.727 5818.16 12912 74.492 5959.36 13235 76.356 6108.48 32 33 10619 61.263 4901.04 11154 64.350 5148.00 11712 67.569 5405.52 12295 70.933 5674.64 12912 74.492 5959.36 13235 76.356 6108.48 13558 78.219 6257.52 33 34 10887 62.810 5024.80 11430 65.942 5275.36 12002 69.242 5539.36 12606 72.727 5818.16 13235 76.356 6108.48 13558 78.219 6257.52 13894 80.158 6412.64 34 35 11154 64.350 5148.00 11712 67.569 5405.52 12295 70.933 5674.64 12912 74.492 5959.36 13558 78.219 6257.52 13894 80.158 6412.64 14237 82.137 6570.96 35 36 11430 65.942 5275.36 12002 69.242 5539.36 12606 72.727 5818.16 13235 76.356 6108.48 13894 80.158 6412.64 14237 82.137 6570.96 14588 84.162 6732.96 36 37 11712 67.569 5405.52 12295 70.933 5674.64 12912 74.492 5959.36 13558 78.219 6257.52 14237 82.137 6570.96 14588 84.162 6732.96 14946 86.227 6898.16 37 38 12002 69.242 5539.36 12606 72.727 5818.16 13235 76.356 6108.48 13894 80.158 6412.64 14588 84.162 6732.96 14946 86.227 6898.16 15318 88.373 7069.84 38 39 12295 70.933 5674.64 12912 74.492 5959.36 13558 78.219 6257.52 14237 82.137 6570.96 14946 86.227 6898.16 15318 88.373 7069.84 15693 90.537 7242.96 39 40 12606 72.727 5818.16 13235 76.356 6108.48 13894 80.158 6412.64 14588 84.162 6732.96 15318 88.373 7069.84 15693 90.537 7242.96 16084 92.792 7423.36 40 41 12912 74.492 5959.36 13558 78.219 6257.52 14237 82.137 6570.96 14946 86.227 6898.16 15693 90.537 7242.96 16084 92.792 7423.36 16472 95.031 7602.48 41 42 13235 76.356 6108.48 13894 80.158 6412.64 14588 84.162 6732.96 15318 88.373 7069.84 16084 92.792 7423.36 16472 95.031 7602.48 16889 97.437 7794.96 42 43 13558 78.219 6257.52 14237 82.137 6570.96 14946 86.227 6898.16 15693 90.537 7242.96 16472 95.031 7602.48 16889 97.437 7794.96 17303 99.825 7986.00 43 44 13894 80.158 6412.64 14588 84.162 6732.96 15318 88.373 7069.84 16084 92.792 7423.36 16889 97.437 7794.96 17303 99.825 7986.00 17734 102.312 8184.96 44 45 14237 82.137 6570.96 14946 86.227 6898.16 15693 90.537 7242.96 16472 95.031 7602.48 17303 99.825 7986.00 17734 102.312 8184.96 18168 104.815 8385.20 45 BI-WEEKLY AMT.
HOLIDAY PAY 13.0 * Salary Increase per MOU of 5% plus Discretionary Allocation re-allocated to Salary DAYS
RANGE MONTH HOURLY BI-WEEKLY 5.000%
31 10117 58.367 4669.36 233.47
32 10370 59.827 4786.16 239.31
33 10619 61.263 4901.04 245.05
34 10887 62.810 5024.80 251.24
35 11154 64.350 5148.00 257.40
36 11430 65.942 5275.36 263.77
37 11712 67.569 5405.52 270.28
38 12002 69.242 5539.36 276.97
39 12295 70.933 5674.64 283.73
40 12606 72.727 5818.16 290.91
41 12912 74.492 5959.36 297.97
42 13235 76.356 6108.48 305.42
43 13558 78.219 6257.52 312.88
44 13894 80.158 6412.64 320.63
45 14237 82.137 6570.96 328.55
46 14588 84.162 6732.96 336.65
47 14946 86.227 6898.16 344.91
48 15318 88.373 7069.84 353.49
49 15693 90.537 7242.96 362.15
50 16084 92.792 7423.36 371.17
51 16472 95.031 7602.48 380.12
52 16889 97.437 7794.96 389.75
53 17303 99.825 7986.00 399.30
54 17734 102.312 8184.96 409.25
55 18168 104.815 8385.20 419.26
REVISED: 3/9/2017
Prepared by Finance - Accounting Services9 - 21
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
9 - 22
Municipal Fee Schedule
Public Works
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Parcel Map and Record of $ 8,659.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Survey Checking Fee per map Engineering/
LPD O. No.: Prop 26 Exception: 1,2,3,6
O. Date:
Collected By: Full Cost: 8,659.00$
Finance
Final Map Checking Fee $ 10,765.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification plus Engineering/
LPD O. No.: Prop 26 Exception: 1,2,3,6
$ 468.00 O. Date:
per lot Collected By: Full Cost: 10,765.00$
beyond 5 lots Finance
Amended Parcel Map, and $ 3,628.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Record of Survey Checking per map Engineering/
Fee LPD O. No.: Prop 26 Exception: 1,2,3,6
O. Date:
Collected By: Full Cost: 3,628.00$
Finance
Amended Final Map $ 4,446.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Checking Fee per map Engineering/
LPD O. No.: Prop 26 Exception: 1,2,3,6
O. Date:
Collected By: Full Cost: 4,446.00$
Finance
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Reference: CMD 109 10 - 1 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Processing Certificate of $ 3,042.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Correction per certificate Engineering/
LPD O. No.: Prop 26 Exception: 1,2,3,6
(for Final/Parcel Maps.) O. Date:
Collected By: Full Cost: 3,042.00$
Finance
Assessment District Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Reapportionment Fee - Engineering/
Assemblage/Parcel Split LPD O. No.: Prop 26 Exception: 1,2,3,6 O. Date:
First two Parcels $ 7,020.00 Collected By: Full Cost: 7,020.00$ Finance
Each Subsequent Parcel $ 1,755.00
Processing Certificate of City staff time Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Compliance at a rate of Engineering/
$ 234.00 LPD O. No.: Prop 26 Exception: 1,2,3,6
per hour O. Date:
Collected By: Full Cost: Actual Cost
Finance
Lot Line Adjustment $ 6,787.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Processing per application Engineering/
LPD O. No.: Prop 26 Exception: 1,2,3,6
O. Date:
Collected By: Full Cost: 6,787.00$
Finance
Reference: CMD 109 10 - 2 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Security Deposit for Survey Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Property Monument $ 538.00 Engineering/
per monument LPD O. No.: Prop 26 Exception: 1,2,3,6
O. Date:
Minimum Security Deposit $ 2,671.00 Collected By: Full Cost: 2,671.00$ minimum Finance
per map
Security Deposit for Survey Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification City Standard Street $ 1,604.00 Engineering/
Monuments per monument LPD O. No.: Prop 26 Exception: 1,2 O. Date:
Minimum Security Deposit $ 2,671.00 Collected By: Full Cost: 2,671.00$ minimum Finance
per map
Encroachment Permit: Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Engineering/
Processing Fee LPD O. No.: Prop 26 Exception: 1,2,3
for Project up to $15K $ 351.00 O. Date:
per permit Collected By: Full Cost: 468.00$
Finance
for Project over $15K $ 468.00
per permit
Reference: CMD 109 10 - 3 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Encroachment Permit: Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Engineering/
Engineering Plan Check for LPD O. No.: Prop 26 Exception: 1,2,3 Projects up to $15K (per plan O. Date:
set)-includes 3 checks $ 351.00 Collected By: Full Cost: Varies Finance
Engineering Plan Check for
Projects over $15K (per plan
sheet)-includes 3 checks $ 1,229.00
Engineering Plan Check (per
plan set for Projects up to
$15K and per sheet for
Projects over $15K)-4th and
subsequent review $ 117.00
Encroachment Permit:
Engineering Inspection
$0-$15K $ 351.00
$15,001-$25K $ 1,405.00
$25,001-$50K $ 3,511.00
$50,001-$100K $ 5,851.00
$101K-$200K $ 9,361.00
$201K-$500K $ 19,892.00
$501K-$1M $ 39,784.00
>$1M; plus each additional
$500K or fraction thereof $ 12,871.00
Reference: CMD 109 10 - 4 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Encroachment Permit: $ 1.88 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Slurry Seal Fee per square ft, or Engineering/
LPD O. No.: Prop 26 Exception: 1,2,3
$ 86.00 O. Date:
minimum Collected By: Full Cost: 86.00$
Finance
Encroachment Permit: Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Field Marking-Storm Drain Engineering/
Up to 50 ft. of excavation $ 104.00 LPD O. No.: Prop 26 Exception: 1,2,3 See Article 2 of Chapter 3.1 O. Date: of Div. 5 of Title 1 of the
Over 50 ft. of excavation $ 104.00 Collected By: Full Cost: 104.00$ Government Code plus Finance
$ 68.00
Each additional
50 ft or fraction
thereof
Reference: CMD 109 10 - 5 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Copy of $ 0.20 Charged By: Date: 6/9/2009 Objective: Recover Cost Citywide rate for Design Criteria per page Engineering/ copying plus sales tax. for public LPD Res. No.: 09-7631 Prop 26 Exception: 1,2 Standard Details $ 0.05
per page Collected By: Full Cost: Cost
Standard Specifications for employees Finance
Subdivision Code
Property Development
Ordinance
Black Line Print of Plans $ Cost Charged By: Date: 6/9/2009 Objective: Recover Cost Actual cost of duplication on file Engineering
Res. No.: 09-7631 Prop 26 Exception: 1,2
Collected By: Full Cost: Cost
Finance
Record Drawings $ 66.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Archiving Fee per sheet Engineering/
LPD O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: 66.00$
Finance
Reference: CMD 109 10 - 6 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Watershed Map $ Cost Charged By: Date: 6/9/2009 Objective: Recover Cost Actual cost of duplication Engineering/
LPD Res. No.: 09-7631 Prop 26 Exception: 1,2
Collected By: Full Cost: Cost
Finance
Encroachment Agreement
$ 4,447.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Application per application Engineering/
LPD O. No.: Prop 26 Exception: 1,2,3
Into Easements O. Date:
or Collected By: Full Cost: 4,447.00$
Into Rights of Way Finance
Preparation of Agreement/ $ 5,383.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Easement/Grant Deed per document Engineering/
LPD O. No.: Prop 26 Exception: 1,2
Preparation of Minor Agrmnt $ 2,691.00 O. Date:
Easement/Grant Deed Collected By: Full Cost: 5,383.00$
Finance
Combination Agreement/ $ 8,074.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Grant Deed for the same lot both documents Engineering/ LPD O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: 8,074.00$
Finance
Reference: CMD 109 10 - 7 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Document Recordation Fee $ Cost Charged By: Date: Objective: Recover Cost Fee to recover direct costs for Engineering/ recording documents at the
LPD O. No.: Prop 26 Exception: 1,2 County Recorder
O. Date:
Collected By: Res. No.: 08-7527 Full Cost: Cost
Finance Res. Date: 6/10/2008
Review of Agreements & $ 3,979.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification Easements per document Engineering/
LPD O. No.: Prop 26 Exception: 1,2
Review of Minor Agrmnts & $ 1,989.00 O. Date:
Easements Collected By: Full Cost: 3,979.00$
Finance
Storm Drain Outlet Charge
$ 6,659.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification per acre Engineering/
LPD O. No.: Prop 26 Exception: 6
O. Date:
Collected By: Full Cost: 6,659.00$
Finance
Storm Outlet $ 6,659.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Charge per acre Engineering/
Institutional LPD O. No.: Prop 26 Exception: 6
$ 2,207.00 O. Date:
(allowed under certain per acre Collected By: Full Cost: 6,659.00$ conditions) Finance
Reference: CMD 109 10 - 8 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Sanitary Sewer Outlet $ 392.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Charge per unit Engineering/
Residential-Single Family LPD O. No.: Prop 26 Exception: 6 $ 1,471.00 O. Date:
(choose the greatest and per lot Collected By: Full Cost: 6,659.00$ add Conveyance Fee) Finance
$ 6,659.00
per acre
Sanitary Sewer Outlet $ 550.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Charge per lot Engineering/
Trailer Parks & Mobile Homes LPD O. No.: Prop 26 Exception: 6 $ 6,659.00 O. Date:
(choose the greatest and per acre Collected By: Full Cost: 6,659.00$ add Conveyance Fee) Finance
Sanitary Sewer Outlet $ 392.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Charge per unit Engineering/
Condo & Planned Unit LPD O. No.: Prop 26 Exception: 6
Development $ 6,659.00 O. Date:
(choose the greatest and per acre Collected By: Full Cost: 6,659.00$ add Conveyance Fee) Finance
Sanitary Sewer Outlet $ 1,470.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Charge per lot Engineering/
Commercial & Industrial LPD O. No.: Prop 26 Exception: 6 $ 6,659.00 O. Date:
(choose the greatest and per acre Collected By: Full Cost: 6,659.00$ add Conveyance Fee) Finance
Reference: CMD 109 10 - 9 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Sanitary Sewer Outlet Charged By: Date: 6/15/2010 Objective: Recover Cost Charge - Conveyance Fee $ 4,218.00 Engineering/
Residential per dwelling unit LPD Res. No.: 10-7741 Prop 26 Exception: 6 Res. Date: 6/15/2010
Collected By: Full Cost: 4,218.00$
Finance
Sanitary Sewer Outlet Charged By: Date: 6/15/2010 Objective: Recover Cost Charge - Conveyance Fee $ 8.60 Engineering/
Non-residential per gallon LPD Res. No.: 10-7741 Prop 26 Exception: 6 per day Res. Date: 6/15/2010
Collected By: Full Cost: 8.60$
Finance
Sanitary Sewer Capacity $ 8,844.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 3 for justification Model Run Fee for initial run Engineering/
LPD O. No.: Prop 26 Exception: 6
time & material O. Date:
for subsequent Collected By: Res. No.: 08-7526 Full Cost: 8,844.00$ model run Finance Res. Date: 6/10/2008
Reference: CMD 109 10 - 10 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Existing Improvements Charged By: Date: 4/18/2017 Objective: Recover Cost A. Street Improvements Engineering/ See note 2 for justification Residential $ 93.50 LPD O. No.: Prop 26 Exception: 6
Commercial $ 198.50 O. Date:
Industrial $ 142.80 Collected By: Full Cost: 198.50$
per front foot Finance
Existing Improvement (cont'd)
Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification B. Street Curbing $ 34.10 Engineering/
per front foot LPD O. No.: Prop 26 Exception: 6
O. Date:
Collected By: Full Cost: 34.10$
Finance
Existing Improvement (cont'd) Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Engineering/
C. Sidewalk Improvements $ 13.65 LPD O. No.: Prop 26 Exception: 6 per square foot O. Date:
Collected By: Full Cost: 13.65$
Finance
Reference: CMD 109 10 - 11 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Existing Improvement (cont'd) Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification Engineering/
D. Street Name Signs $ 0.24 LPD O. No.: Prop 26 Exception: 6 per front foot O. Date:
Collected By: Full Cost: 0.24$
Finance
Existing Improvement (cont'd) Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification E. Sanitary Sewers $ 34.05 Engineering/
per front foot LPD O. No.: Prop 26 Exception: 6
O. Date:
Collected By: Full Cost: 34.05$
Finance
Existing Improvement (cont'd) Charged By: Date: 4/18/2017 Objective: Recover Cost See note 2 for justification F. Storm Drains $ 34.05 Engineering/
per front foot LPD O. No.: Prop 26 Exception: 6
O. Date:
Collected By: Full Cost: 34.05$
Finance
Existing Improvement (cont'd) $ Use original Charged By: Date: 6/29/1989 Objective: Recover Cost G. Right-of-way and/or cost per square Engineering/
Easements foot LPD O. No.: Prop 26 Exception: 6
O. Date:
Collected By: Other (specify): Full Cost: Cost
Finance
Reference: CMD 109 10 - 12 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Recreation Tax (Bedroom) - Charged By: Date: 8/5/1969 Objective: User Fee See SCCC 3.15.020 New Construction-Permit Engineering/
First Bedroom $ 15.00 LPD O. No.: 1216 Prop 26 Exception: 6 O. Date: 8/5/1969
Each additional $ 5.00 Collected By: Full Cost: 15.00$
per bedroom Finance
Recreation Tax (Bedroom) - Charged By: Date: 8/5/1969 Objective: User Fee See SCCC 3.15.020 Additions Engineering/
LPD O. No.: 1216 Prop 26 Exception: 6
Each additional $ 5.00 O. Date: 8/5/1969
per bedroom Collected By: Full Cost: 5.00$
Finance
Traffic Impact Fee
per square foot Charged By: Date: 7/6/2010 Objective: Impact Dev. Fee Applicable to areas within the Office/R & D $ 1.00 Engineering/ Traffic Impact Fee Area Map Industrial $ 0.67 LPD Prop 26 Exception: 6
Warehousing, Utilities $ 0.20
Communications Collected By: Res. No.: 10-7756 Full Cost: 1.61$ Hotel-Motel $ 400.00 Finance Res. Date: 7/6/2010 per room
Reference: CMD 109 10 - 13 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
ENGINEERING/LPD; DESIGN; TRAFFIC RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE or CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
FULL COST FACTOR
Oversize, Overweight Charged By: Date: 6/7/2005 Objective: User Fee Statewide rate Vehicles Fee per vehicle Engineering/
Traffic O. No.: Prop 26 Exception: 3
Single $ 16.00 O. Date:
Full Cost: 701.00$
Annual $ 90.00 Collected By:
Finance
Traffic Flow Map - Mailed $ 29.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 1 for justification each Engineering/
Traffic O. No.: Prop 26 Exception: 1,2
Traffic Flow Map - Not $ 10.40 O. Date:
Mailed each Collected By: Full Cost: 34.00$
Finance
Storage or Refuse Bins on $ 202.00 Charged By: Date: 4/18/2017 Objective: Recover Cost See note 4 for justification City Street each Engineering/
Traffic O. No.: Prop 26 Exception: 1,2
O. Date:
Collected By: Full Cost: 234.00$
Finance
Reference: CMD 109 10 - 14 Form: FEEFORM Revised: May 2011 10 - 15
ENGINEERING DEPARTMENT
JUSTIFICATION FOR INCREASE IN FEES, RATES, AND CHARGES
NOTE 1: Fees, rates, charges to recover costs for these types of Engineering services are proposed to be increased 3.5% above current fees, rates, and charges, consistent with the percentage increase in the CPI-U ending December 2016 for the San Francis co- Oakland-San Jose area. The proposed amounts have been rounded off and, therefore, the actual percentage increase may vary slightly.
NOTE 2: Fees, rates, charges to recover costs for these types of fees/reimbursements for public improvements are proposed to be increased 4.1% above 2016-17 fees, rates, and charges, consistent with the percentage increase in the Construction Cost Index (December 2016) as published by the Engineering News-Record. The proposed amounts have been rounded off and, therefore, the actual percentage increase may vary slightly.
NOTE 3: Based on last year’s historical data, the average actual co st for this Engineering service is $8,844.00 per sanitary sewer model run. Fees, rates, charges to recover costs for this Engineering service is proposed to be increased 12.7% above 2016-17 fees, rates, and charges.
NOTE 4: Fees, rates, charges that continue to be well below the full cost recovery are proposed to be increased by 25% (or more in some cases).
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
STREET / STORM DRAIN DIVISION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable)
1. Active construction site Charged By: Date: 4/18/2017 Objective: Recover Cost MRP requires inspection inspections of projects $ 137.65 Storm Drain of sites once a month over one (1) acre in size O. No.: Prop 26 Exception: 1,2 during wet season. and high priority sites Collected By: O. Date: 7 inspections per year during wet season (Oct. - Storm Drain Full Cost: 137.65$ required if permit is open Apr.) as required by & Finance during wet season, plus
Provision C.6 of MRP reinspections as needed.
2. Industrial/commercial Charged By Date 4/18/2017 Objective: Recover Cost Inspection frequency facility stormwater $ 412.97 Storm Drain of businesses that have inspections as required O. No.: Prop 26 Exception: 1,2 filed a Notice of Intent (NOI) by Provision C.4 of Collected By O. Date: is once per year as required MRP (Tier 1) Storm Drain Full Cost: 412.97$ by the Municipal Regional & Finance Stormwater NPDES Permit.
3. Industrial/commercial Charged By Date 4/18/2017 Objective: Recover Cost Businesses that received facility stormwater $ 137.65 Storm Drain a Notice of Violation during inspections as required O. No.: Prop 26 Exception: 1,2 an industrial/commercial by Provision C.4 of Collected By O. Date: stormwater inspection MRP (Tier 2) Storm Drain Full Cost: 137.65$ the previous year are & Finance required to be inspected the
following year.
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
COMMENTS
Reference: CMD 109 10 - 16 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
STREET / STORM DRAIN DIVISION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
COMMENTS
4. Operation & maintenance $ 137.65 Charged By Date: 4/18/2017 Objective: Recover Cost Operation & maintenance inspection of stormwater Storm Drain inspections required on treatment systems installed O. No.: Prop 26 Exception: 1,2 annual basis to ensure on projects as required Collected By: O. Date: the stormwater treatment by Provision C.3 of MRP Storm Drain Full Cost: 137.65$ systems are properly & Finance maintained.
Reference: CMD 109 10 - 17 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
STREET / STREET MAINTENANCE DIVISION RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) Pavement Restoration Charge Charged By: Date: 4/18/2017 Objective: Recover Cost Fee is applicable to trench Up to 3" Thick Asphalt Engineering repairs for City utilities
1. First 80 sq. ft. $ 1,478.75 O. No.: Prop 26 Exception: 1,2 street opening permits up to 80 sq. ft. Collected By: O. Date:
Engineering Full Cost: 2,063.80$
2. Each additional sq. ft. $ 18.44 & Finance
per sq. ft.
Engineering Plan Review Charged By Date 4/18/2017 Objective: Recover Cost Fee is applicable to trench per sheet (Streets) Engineering repairs for City utilities
1. First three (3) reviews $ 114.89 O. No.: Prop 26 Exception: 1,2 street opening permits Collected By O. Date:
2. Fourth and subsequent $ 23.81 Engineering Full Cost: 114.89$ review & Finance
Concrete Removal/Replace $ 108.68 Charged By Date: 4/18/2017 Objective: Recover Cost Fee is applicable to trench Charge - Curb/Gutter per l.f. Engineering repairs for City utilities O. No.: Prop 26 Exception: 1,2 street opening permits
Collected By: O. Date:
Engineering & Full Cost: 108.68$
Finance
Concrete Removal/Replace
$ 61.25 Charged By: Date: 4/18/2017 Objective: Recover Cost Fee is applicable to trench Charge - Sidewalk per sq. ft. Engineering repairs for City utilities O. No.: Prop 26 Exception: 1,2 street opening permits.
Collected By: O. Date:
Engineering & Full Cost: 77.63$
Finance
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
COMMENTS
Reference: CMD 109 10 - 18 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
STREET / PARKWAYS & BOULEVARDS RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Street tree removal $ 137.66 Charged By: Date: 4/18/2017 Objective: Recover Cost Contract Costs:
per hour Parkways & 1-3" dbh: $50
Boulevards O. No.: Prop 26 Exception: 1,2 4-6" dbh: $100 Plus contract O. Date: 7-12" dbh: $300
cost to remove Collected By: Full Cost: 137.66$ 13-18" dbh: $600 tree & stump as Finance 19-24" dbh: $850
specified in the 25-30" dbh: $1,150
Comments 31-36" dbh: $1,500
Section are 37-42" dbh: $2,000
added to the 43+" dbh: $3,000
Fee.
Street tree planting $ 137.66 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes tractor, auger, per tree Parkways & fertilizer, compost &
Illegal removal Boulevards O. No.: Prop 26 Exception: 1,2 stakes and 15 gallon tree.
O. Date:
Collected By: Full Cost: $137.66
Finance
Street tree planting $ 393.75 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes tractor, auger, per tree Engineering fertilizer, compost &
Property development O. No.: Prop 26 Exception: 1,2,6 stakes and 15 gallon tree.
Collected By: O. Date:
Finance Full Cost: $487.66
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 10 - 19 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
STREET / PARKWAYS & BOULEVARDS RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Engineering Plan Review Charged By: Date: 4/18/2017 Objective: Recover Cost Initial Review includes up per sheet - Initial Review Engineering to three (3) plan checks.
1. First three (3) reviews $ 114.89 O. No.: Prop 26 Exception: 2 Collected By: O. Date:
2. Fourth and subsequent $ 23.81 Finance Full Cost: $114.89 review
Reference: CMD 109 10 - 20 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
STREET / SOLID WASTE RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) Charged By: Date: 4/18/2017 Objective: User Fee Haulers that want to charge Non-exclusive franchise $ 687.24 Solid Waste for solid waste collection hauler application fee O. No.: Prop 26 Exception: 2 services at properties Collected By: O. Date: zoned for Industrial use
Solid Waste Full Cost: 687.24$ have agreements approved & Finance by Council at a Public
Hearing.
COMMENTSFULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 10 - 21 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
10 - 22
Municipal Fee Schedule
Water and Sewer Utilities
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS 5/8" x 3/4" water service $ 13,092.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Note: The cost of meters, Water backflows, and Encroachment
O. No.: Prop 26 Exception: 6 Permit not included.
Collected By: O. Date:
Engineering Full Cost: 13,092.00$
1" water service $ 13,092.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Note: The cost of meters, Water backflows, and Encroachment
O. No.: Prop 26 Exception: 6 Permit not included.
Collected By: O. Date:
Engineering Full Cost: 13,092.00$
1-1/2" water service $ 13,092.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Note: The cost of meters, Water backflows, and Encroachment
O. No.: Prop 26 Exception: 6 Permit not included.
Collected By: O. Date:
Engineering Full Cost: 13,092.00$
2" water service $ 13,092.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Note: The cost of meters, Water backflows, and Encroachment
O. No.: Prop 26 Exception: 6 Permit not included.
Collected By: O. Date:
Engineering Full Cost: 13,092.00$
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 11 - 1 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
3" water service $ 28,628.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Note: The cost of meters, Water backflows, and Encroachment
O. No.: Prop 26 Exception: 6 Permit not included.
Collected By: O. Date:
Engineering Full Cost: 28,628.00$
4" water service $ 28,628.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Note: The cost of meters, Water backflows, and Encroachment
O. No.: Prop 26 Exception: 6 Permit not included.
Collected By: O. Date:
Engineering Full Cost: 28,628.00$
6" water service $ 28,628.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Note: The cost of meters, Water backflows, and Encroachment
O. No.: Prop 26 Exception: 6 Permit not included.
Collected By: O. Date:
Engineering Full Cost: 28,628.00$
8" water service $ 28,628.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Note: The cost of meters, Water backflows, and Encroachment
O. No.: Prop 26 Exception: 6 Permit not included.
Collected By: O. Date:
Engineering Full Cost: 28,628.00$
Reference: CMD 109 11 - 2 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
10" water service $ Estimated Charged By: Date: 6/9/2009 Objective: Recover Cost Cost of water service to be Water determined at time of service
O. No.: Prop 26 Exception: 6 request.
Collected By: O. Date:
Engineering Full Cost: $ Estimated
Water distribution main Charged By: Date: 4/18/2017 Objective: Recover Cost Where frontage exists on only (front footage fee) Water one side of the street, fee is Development exists on one $ 87.00 O. No.: Prop 26 Exception: 6 $87 per front foot. side of street per lineal foot Collected By: O. Date: For on-site main extensions, fee is Engineering Full Cost: 158.00$ $158 per lineal foot.
Development exists on two $ 158.00 Fee includes spoil disposal. sides of street per lineal foot
5/8" x 3/4" water meter $ 323.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes cost of RP backflow and backflow preventer Water prevention device.
O. No.: Prop 26 Exception: 6 Where not applicable, deduct $234.
Collected By: O. Date:
Engineering Full Cost: 323.00$
Reference: CMD 109 11 - 3 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
1" water meter $ 431.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes cost of RP backflow and backflow preventer Water prevention device.
O. No.: Prop 26 Exception: 6 Where not applicable, deduct $234.
Collected By: O. Date:
Engineering Full Cost: 431.00$
1-1/2" water meter $ 970.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes cost of RP backflow and backflow preventer Water prevention device.
O. No.: Prop 26 Exception: 6
Collected By: O. Date:
Engineering Full Cost: 970.00$
2" water meter $ 1,122.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes cost of RP backflow and backflow preventer Water prevention device.
O. No.: Prop 26 Exception: 6
Collected By: O. Date:
Engineering Full Cost: 1,122.00$
3" water meter $ 1,122.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes cost of RP backflow and backflow preventer Water prevention device.
O. No.: Prop 26 Exception: 6
Collected By: O. Date:
Engineering Full Cost: 1,122.00$
Reference: CMD 109 11 - 4 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
4" water meter $ 2,450.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes cost of RP backflow and backflow preventer Water prevention device.
O. No.: Prop 26 Exception: 6
Collected By: O. Date:
Engineering Full Cost: 2,450.00$
6" water meter $ 3,259.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes cost of RP backflow and backflow preventer Water prevention device.
O. No.: Prop 26 Exception: 6
Collected By: O. Date:
Engineering Full Cost: 3,259.00$
8" water meter $ 6,233.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Includes cost of RP backflow and backflow preventer Water prevention device.
O. No.: Prop 26 Exception: 6
Collected By: O. Date:
Engineering Full Cost: 6,233.00$
10" water meter $ Estimated Charged By: Date: 6/9/2009 Objective: Recover Cost Cost of meter and backflow and backflow preventer Water prevention device to be
O. No.: Prop 26 Exception: 6 determined at time of service Collected By: O. Date: request.
Engineering Full Cost: $ Estimated
Reference: CMD 109 11 - 5 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Special fire hydrant $ 21,139.00 Charged By: Date: 4/18/2017 Objective: Recover Cost For hydrant requested by Water property owner/developer,
O. No.: Prop 26 Exception: 6 not required by the City.
Collected By: O. Date:
Engineering Full Cost: 21,139.00$
Fire Service
Charged By: Date: 4/18/2017 Objective: Recover Cost Cost for DCDA, RPDA, or (Installation of fire service line) Water Encroachment Permit not included.
O. No.: Prop 26 Exception: 6
2" fire service $ 13,267.00 Collected By: O. Date:
4" fire service $ 27,084.00 Engineering Full Cost: 28,628.00$ 6" fire service $ 28,179.00
8" fire service $ 28,628.00
10" fire service $ 28,628.00
Fire Service Upgrade
Charged By: Date: 4/18/2017 Objective: Recover Cost Cost for DCDA, RPDA, or (Upgrade device to DCDA Water Encroachment Permit not included. or RPDA) O. No.: Prop 26 Exception: 6
Collected By: O. Date:
4" fire service $ 11,696.00 Engineering Full Cost: 11,696.00$ 6" fire service $ 11,696.00
8" fire service $ 11,696.00
10" fire service $ 11,696.00
Reference: CMD 109 11 - 6 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Cost of Backflow Preventer - Charged By: Date: 4/18/2017 Objective: Recover Cost device cost only Water
O. No.: Prop 26 Exception: 6
4" DCDA $ 2,200.00 Collected By: O. Date:
6" DCDA $ 3,217.00 Engineering Full Cost: $ Varies 8" DCDA $ 5,786.00
10" DCDA $ 8,145.00
4" RPDA $ 3,000.00
6" RPDA $ 3,929.00
8" RPDA $ 7,012.00
10" RPDA $ 9,131.00
Reference: CMD 109 11 - 7 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Fire Hydrant Flow Test $ 452.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Water
O. No.: Prop 26 Exception: 2
Collected By: O. Date:
Municipal Full Cost: 1,222.00$
Services
Portable hydrant meter Charged By: Date: 4/18/2017 Objective: Recover Cost Deposit to insure return of meter, and Deposit $ 1,509.00 Water or cover replacement if lost or (Includes cost of RP backflow) O. No.: Prop 26 Exception: 1,2,6 damaged. $100 of the deposit is Collected By: O. Date: non-refundable.
Finance / Full Cost: 1,509.00$ Includes cost of RP backflow.
Municipal Serv.
Recycled hydrant meter Charged By: Date: 4/18/2017 Objective: Recover Cost Deposit to insure return of meter, and Deposit $ 1,509.00 Water or cover replacement if lost or (Includes cost of RP O. No.: Prop 26 Exception: 1,2,6 damaged. $100 of the deposit is backflow) Collected By: O. Date: non-refundable.
Finance / Full Cost: 1,509.00$ Includes cost of RP backflow.
Municipal Serv.
Water meter test $ 259.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Non-routine testing of water Water meter when customer questions
O. No.: Prop 26 Exception: 1,2,6 meter accuracy. Refundable if Collected By: O. Date: meter falls outside accepted
Finance / Full Cost: 655.00$ range.
Municipal Serv.
Reference: CMD 109 11 - 8 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Engineering Plan Review Charged By: Date: 4/18/2017 Objective: Recover Cost Water
Engineering Plan Check for $ 262.00 O. No.: Prop 26 Exception: 6 Projects up to $15K (per plan Collected By: O. Date:
set) - includes 3 checks Engineering Full Cost: $ Varies Engineering Plan Check for $ 916.00
Projects over $15K
(per sheet) - includes 3 checks
Engineering Plan Check $ 87.00
(per plan set for Projects up to
$15K and per sheet for
Projects over $15K) - 4th and
subsequent review
Engineering Inspection
$0-$15K $ 262.00
$15,001-$25K $ 1,047.00
$25,001-$50K $ 2,618.00
$50,001-$100K $ 4,364.00
$101K-$200K $ 6,983.00
$201K-$500K $ 14,838.00
$501K-$1M $ 29,678.00
>$1M; plus each additional $ 9,601.00
$500K or fraction thereof
Reference: CMD 109 11 - 9 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Water Supply Assessment $ 8,728.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Developers shall be required to Preparation Water pay for water supply
O. No.: Prop 26 Exception: 6 assessment preparation (WSA) Collected By: O. Date: services rendered by the
Finance Full Cost: 8,728.00$ Water Utility.
Supplemental Assessment
Preparation $ 5,586.00 Required due to changes in project.
Water reconnection fee - $ 217.00 Charged By: Date: 4/18/2017 Objective: Recover Cost normal reconnection per account Water Penalty
O. No.:
Water replacement/ $ 393.00 Collected By: O. Date: Prop 26 Exception: 1,2,5 reconnection fee due to per account Finance /
meter tampering/illegal Municipal Serv. Full Cost: 393.00$ access Fee to fix meter
plus two (2)
times the
estimated cost
of services usedReference: CMD 109 11 - 10 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Small water service (2" and $ 6,966.00 Charged By: Date: 4/18/2017 Objective: Recover Cost No Encroachment Permit cost smaller) abandonment Water included.
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: 7,113.00$
Large water service (3" and $ 15,949.00 Charged By: Date: 4/18/2017 Objective: Recover Cost No Encroachment Permit cost larger) abandonment Water included.
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: 16,540.00$
Water service relocation $ 6,284.00 Charged By: Date: 4/18/2017 Objective: Recover Cost For service relocation of no more Water than 4 feet from the existing
O. No.: Prop 26 Exception: 1,2 location.
Collected By: O. Date: No Encroachment Permit cost
Finance Full Cost: 6,284.00$ included.
Reference: CMD 109 11 - 11 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Hot tap (3/4" to 2") $ 1,091.00 Charged By: Date: 4/18/2017 Objective: Recover Cost For hot tapping City's water main.
Water Developer to provide all required
O. No.: Prop 26 Exception: 6 tapping materials.
Collected By: O. Date: No Encroachment Permit cost
Finance Full Cost: 1,091.00$ included.
Hot tap (3" and larger) $ 2,134.00 Charged By: Date: 4/18/2017 Objective: Recover Cost For hot tapping City's water main.
Water Developer to provide all required
O. No.: Prop 26 Exception: 6 tapping materials.
Collected By: O. Date: No Encroachment Permit cost
Finance Full Cost: 2,138.00$ included.
Field Marking - Water Charged By: Date: 4/18/2017 Objective: Recover Cost Up to 50 ft. of excavation $ 137.00 Water
O. No.: Prop 26 Exception: 2
Over 50 ft. - each additional $ 137.00 Collected By: O. Date:
50 ft. or fraction thereof of Fi nance Full Cost: 175.00$ excavation
Field Marking - Recycled Water Charged By: Date: 4/18/2017 Objective: Recover Cost Up to 50 ft. of excavation $ 137.00 Water
O. No.: Prop 26 Exception: 2
Over 50 ft. - each additional $ 137.00 Collected By: O. Date:
50 ft. or fraction thereof of Fi nance Full Cost: 175.00$ excavation
Reference: CMD 109 11 - 12 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / WATER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Small water and fire services - $ 2,269.00 Charged By: Date: 4/18/2017 Objective: Recover Cost 2" and smaller Water
(Inspection & Tap for O. No.: Prop 26 Exception: 2
Construction Installation Collected By: O. Date:
Services) Finance Full Cost: 2,269.00$
Large water and fire services - $ 3,491.00 Charged By: Date: 4/18/2017 Objective: Recover Cost 3" and larger Water
(Inspection & Tap for O. No.: Prop 26 Exception: 2
Construction Installation Collected By: O. Date:
Services) Finance Full Cost: 3,491.00$
Fire Hydrant $ 3,491.00 Charged By: Date: 4/18/2017 Objective: Recover Cost (Inspection & Tap for Water
Construction Installation O. No.: Prop 26 Exception: 2
Services) Collected By: O. Date:
Finance Full Cost: 3,491.00$
Reference: CMD 109 11 - 13 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / SEWER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Sewer lateral cleanout $ 1,248.00 Charged By: Date: 4/18/2017 Objective: Recover Cost When no cleanout exists, it 4 inch lateral Sewer is necessary that one be
O. No.: Prop 26 Exception: 1,2 installed in order for City to Collected By: O. Date: maintain its part of the sewer
Finance Full Cost: 6,415.00$ lateral.
Sewer lateral cleanout $ 6,178.00 Charged By: Date: 4/18/2017 Objective: Recover Cost When no cleanout exists, it 6 inch lateral or larger Sewer is necessary that one be O. No.: Prop 26 Exception: 1,2 installed in order for City to Collected By: O. Date: maintain its part of the sewer
Finance Full Cost: 6,502.00$ lateral.
Cleanout box only $ 195.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Sewer
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost: 480.00$
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Reference: CMD 109 11 - 14 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / SEWER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
4" sewer lateral installation $ 29,720.00 Charged By: Date: 4/18/2017 Objective: Recover Cost No Encroachment Permit cost Sewer included.
O. No.: Prop 26 Exception: 6 No cleanout or box cost included.
Collected By: O. Date:
Engineering Full Cost: 31,989.00$
6" sewer lateral installation $ 29,720.00 Charged By: Date: 4/18/2017 Objective: Recover Cost No Encroachment Permit cost Sewer included.
O. No.: Prop 26 Exception: 6 No cleanout or box cost included.
Collected By: O. Date:
Engineering Full Cost: 31,989.00$
8" sewer lateral installation $ 29,478.00 Charged By: Date: 4/18/2017 Objective: Recover Cost No Encroachment Permit cost Sewer included.
O. No.: Prop 26 Exception: 6 No cleanout or box cost included.
Collected By: O. Date:
Engineering Full Cost: 31,727.00$
Reference: CMD 109 11 - 15 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / SEWER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Sewer lateral video $ 262.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Video inspection of existing inspection Sewer lateral to determine that its
O. No.: Prop 26 Exception: 1,2,6 replacement is not required Collected By: O. Date: as a condition of
Finance Full Cost: 262.00$ redevelopment.
Sewer lateral point repair $ Estimated Charged By: Date: 4/18/2017 Objective: Recover Cost (between cleanout and main) Sewer
O. No.: Prop 26 Exception: 1,2
Collected By: O. Date:
Finance Full Cost:
$ Estimated
Reference: CMD 109 11 - 16 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES / SEWER RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Encroachment Permit: Charged By: Date: 4/18/2017 Objective: Recover Cost Field Marking-Sanitary Sewer Engineering/
Up to 50 ft. of excavation $ 105.00 LPD O. No.: Prop 26 Exception: 1,2,3 See Article 2 of Chapter 3.1 O. Date: of Div. 5 of Title 1 of the
Over 50 ft. - each additional $ 105.00 Collected By: Full Cost: 105.00$ Government Code 50 ft. or fraction thereof of plus Fi nance
excavation $ 1.32
per foot
Wastewater Treatment Plant Charged By: Date: 4/18/2017 Objective: Recover Cost See SCCC 17.15.220(e) Capacity Fee Engineering/ Sewer Treatment Plant Fee
Residential $ 1,187.00 LPD O. No.: Prop 26 Exception: 6 per dwelling unit O. Date:
Collected By: Full Cost: 2,135.00$
Finance
Wastewater Treatment Plant Charged By: Date: 4/18/2017 Objective: Recover Cost See SCCC 17.15.220(e) Capacity Fee Engineering/ Sewer Treatment Plant Fee
Non-residential $ 4.47 LPD O. No.: Prop 26 Exception: 6 per gallon O. Date:
per day Collected By: Full Cost: 9.68$
Finance
Reference: CMD 109 11 - 17 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES /SOLAR RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS Solar pool heating system $ 3,885.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Costs are recovered through Installation Fee plus Water/Solar the combination of installation O. No.: Prop 26 Exception: N/A fees and monthly service 228.00 Collected By: O. Date: charges, and recoverable per panel Finance Full Cost: 4,320.00$ system components.
Solar domestic hot water $ Estimated Charged By: Date: 6/9/2009 Objective: Recover Cost Costs are recovered through system installation fee Water/Solar the combination of installation Single-family fee O. No.: Prop 26 Exception: N/A fees and monthly service Collected By: O. Date: charges, and recoverable
Finance Full Cost:
$ Estimated system components.
Solar domestic hot water $ Estimated Charged By: Date: 3/14/1985 Objective: Recover Cost Installation fees based on cost system installation fee Water/Solar of labor and permanently- Multi-family fee O. No.: Prop 26 Exception: N/A installed materials. Example Collected By: O. Date: for system to serve 10
Finance Full Cost:
$ Estimated dwelling units. Remaining costs
recovered by monthly
service charges.
Solar domestic hot water $ 457.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Costs are recovered through system panel removal per panel Water/Solar the combination of installation and replacement fee O. No.: Prop 26 Exception: N/A fees and monthly service Collected By: O. Date: charges, and recoverable
Finance Full Cost: 2,444.00$ system components.
FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
(Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 11 - 18 Form: FEEFORM Revised: May 2011
C I T Y OF S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E SUBMITTED BY DEPARTMENT / DIVISION:
WATER & SEWER UTILITIES /SOLAR RESOLUTION NUMBER: 17-8423 APPROVED: 4/18/2017
CHARGING DATE FEE
CURRENT DEPT / DIV LAST CHANGED
FEE --------- ORDINANCE
DESCRIPTION OF and COLLECTING NUMBER & DATE
FEE , RATE OR CHARGE PERIOD DEPT / DIV (if applicable) COMMENTS FULL COST FACTOR
FEE DETAIL
OBJECTIVE
PROP 26 EXCEPTION
(SEE READER'S GUIDE)
Solar pool heating system $ 278.00 Charged By: Date: 4/18/2017 Objective: Recover Cost Costs are recovered through system panel removal per panel Water/Solar the combination of installation and replacement fee O. No.: Prop 26 Exception: N/A fees and monthly service Collected By: O. Date: charges, and recoverable
Finance Full Cost: 422.00$ system components. (Note: "N/A" here signifies the fee, rate, or charge is not a fee imposed exclusively by local government.) Reference: CMD 109 11 - 19 Form: FEEFORM Revised: May 2011
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
11 - 20
Municipal Fee Schedule
Alphabetical Listing by Fee
Fee Section Page No.
10-Day Letter for House Meter Finance 5 - 17
Aboveground Petroleum Storage Tank Program Fire 6 - 62
Active Construction Site Inspections of Projects Street 10 - 16 Additional Temporary Membrane Structure and Tent Fire 6 - 26 Administrative Citation Penalty Fire 6 - 50
Adult Day Care (I4) Fire 6 - 43
Alarm Permit Police 9 - 7
Alternate Materials and Methods Review Fire 6 - 9
Amended Final Map Checking Fee Engineering 10 - 1
Amended Parcel Map, and Record of Survey Checking Fee Engineering 10 - 1 Amplified Music Parks and Recreation 8 - 19
Amplified Music Permit Finance 5 - 14
Animal Control - Adoption Fees Police 9 - 19
Animal Control - Animal Surrender Fees Police 9 - 20
Animal Control - License Fees Police 9 - 18
Animal Control - Other Fees Police 9 - 20
Animal Control - Shelter Services Police 9 - 19
Animal Control - Trap Fees Police 9 - 20
Annexation of Territory to City of Santa Clara Community Development 3 - 6 Annual Operating Budget Financial Report Finance 5 - 1
Appeals Community Development 3 - 5
Architectural Review Community Development 3 - 6
Assessment District Reapportionment Fee Engineering 10 - 2 Automatic Fire Extinguishing Systems Fire 6 - 9
Automatic Fire Protection System for Spray Booths Fire 6 - 28 Automatic Fire Sprinkler Systems - Existing Fire 6 - 10 Automatic Fire Sprinkler Systems - New Fire 6 - 9
Automatic Fire Sprinkler Systems - Residential 13D Fire 6 - 28 Babyland, South Babyland, Children's Garden Parks and Recreation 8 - 10 Backflow Preventer - Device Cost Only Water and Sewer Utilities 11 - 7 Ball Fields and Turf Areas Reservations Parks and Recreation 8 - 16 Baseball and Softball Field Preparation Parks and Recreation 8 - 16 Battery System
s Fire 6 - 12
Billing Service Charge for Late Payment Finance 5 - 15
Bingo Organization Police 9 - 14
Black Line Print of Plans on File Engineering 10 - 6
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
12 - 1
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Block Party Request Finance 5 - 14
Borrowing Materials from Other Libraries (Interlibrary Loan) Librar y 7 - 2 Building Plans Fire 6 - 12
Burial Materials Processing Fee Parks and Recreation 8 - 12 Burial Permit Filing Fee Parks and Recreation 8 - 9
Business Certificate Information Finance 5 - 4
Business Tax Certificate Finance 5 - 3
CAD Report for Legal Purposes Police 9 - 1
California Accidental Release Program (CALARP) Fees Fire 6 - 59 Capital Improvement Budget/Five Year Financial Plan Finance 5 - 1 Carnivals and Fairs Fire 6 - 12
Casket - Baby Land, South Baby Land, Children's Garde
n Parks and Recreation 8 - 9
Casket - Flat Marker Area Parks and Recreation 8 - 9
Casket - Upright Monument Area Parks and Recreation 8 - 9 Casket Burials Parks and Recreation 8 - 1
Casket Placement in a Cryp
t Parks and Recreation 8 - 3
CD for Legal Purposes Police 9 - 17
Central Park - Arbor Center Picnic Area Parks and Recreation 8 - 14 Central Park - Pavilion Group Picnic Area Parks and Recreation 8 - 14 Central Park - Tennis Court Reservations Parks and Recreation 8 - 17 Certificate of Compliance Community Development 3 - 9
Certificate of Compliance Processing Engineering 10 - 2 Certificate of Correction Processing Engineering 10 - 2 CFD 2010-1 Mello-Roos Tax Finance 5 - 2
Change of Address Fire 6 - 13
Change of Name, Address or Business Type as Shown on Current Certificate Finance 5 - 4 Chapel Rental Parks and Recreation 8 - 12
Christmas Tree Lots or Sale Areas at Retail Businesses Fire 6 - 13 Citation Sign Of
f Police 9 - 17
City Administrative Building Rental City Manager 2 - 1
City Charter City Manager 2 - 1
City Flag Finance 5 - 14
City Plaza Park - Gazebo Parks and Recreation 8 - 17
City to Repurchase Interment Rights Parks and Recreation 8 - 8 Cleanout Box Onl
y Water and Sewer Utilities 11 - 14
Clearance Letter Police 9 - 17
12 - 2
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Closing Out Sale Police 9 - 11
Closure of an Onsite Hazardous Waste Treatment System Fire 6 - 13 Collection Agency Fe
e Library 7 - 2
Color Photographs Police 9 - 5
Combination Agreement/Grant Deed for the Same Lot Engineering 10 - 7 Combustible and Flammable Materials Fire 6 - 37
Commercial Day Care (E3) Fire 6 - 43
Community Development Department Referrals Fire 6 - 23
Community Recreation Center Room Rental Parks and Recreation 8 - 13 Comprehensive Annual Financial Repor
t Finance 5 - 1
Compressed Gas Installation Fire 6 - 14
Compressed Gases Fire 6 - 37
Concealed Weapon Permit Police 9 - 7
Concrete Removal/Replace Street 10 - 18
Contract Administration Community Development 3 - 12
Cooking Oil Storage Tanks Fire 6 - 14
Copy Machine Usag
e City Manager 2 - 2
Corrosives Fire 6 - 37
Council Meeting Audio Tape Duplication Fee City Manager 2 - 2 Council Meeting DVD Duplication Fee City Manager 2 - 2
Cremation - Flat Marker Area Parks and Recreation 8 - 10 Cremation - Upright Monument Area Parks and Recreation 8 - 10 Cremation Burial in a Grave Parks and Recreation 8 - 2
Cremation Placement in a Niche Parks and Recreation 8 - 3 Crime Analysis Reports Police 9 - 9
Cryogens Fire 6 - 38
Custom Parks and Recreation 8 - 11
Data CD City Manage
r 2 - 2
Delinquent Payment of Business Certificate Fee Finance 5 - 4 Delinquent Reconnect Fee Finance 5 - 17
Delinquent Service Lette
r Finance 5 - 15
Demolition of Building Fire 6 - 14
Demolition of Fire Protection System Fire 6 - 14
Design Criteria (Copy of) Engineering 10 - 6
Development Agreement Community Development 3 - 8
Disinter and Reinter Casket into Same Grave Parks and Recreation 8 - 4 12 - 3
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Disinternment of Casket Parks and Recreation 8 - 3
Disinternment of Cremation Parks and Recreation 8 - 4
Dispatch Service Required for Special Events Police 9 - 1 Document Recordation Fee Engineering 10 - 8
Driving Under the Influence Emergency Response Police 9 - 8 Duplicate Business Certificate Finance 5 - 4
Electric Disconnection Fee Electric Utilit
y 4 - 6
Electric Reconnection Fee - Normal Reconnection Electric Utilit y 4 - 6 Electric Replacement/Reconnection Fee Due to Meter Tampering/Illegal Access Electric Utilit y 4 - 7 Electric System Damage Electric Utilit y 4 - 5
Emergency Alarm Systems Fire 6 - 15
Emergency Responder Radio Coverage System Fire 6 - 15
Encroachment Agreement Application Engineering 10 - 7
Encroachment Permit Engineering 10 - 3
Encroachment Permit: Field Marking - Sanitary Sewe
r Water and Sewer Utilities 11 - 17
Encroachment Permit: Field Marking - Storm Drain Engineering 10 - 5 Energy Data Pulse
s Electric Utility 4 - 5
Engineering Plan Check - Electric Electric Utility 4 - 8 Engineering Plan Review - Initial Review Street 10 - 20 Engineering Plan Review & Inspection Water and Sewer Utilities 11 - 9 Engineering Plan Review (Streets) Street 10 - 18
Engineering Referrals Fire 6 - 15
Environmental Revie
w Community Development 3 - 7
Environmental Study Fire 6 - 16
Equipment Rental Fees Fire 6 - 5
Exhibit and Trade Shows Fire 6 - 16
Existing Improvements Engineering 10 - 11
Expired Construction Permit Fire 6 - 56
Explosives and Blasting Agents Fire 6 - 16
Extra Hazard Occupanc
y Fire 6 - 47
Facility Rental Fees Fire 6 - 4
Failure to Obtain Construction Permit Fire 6 - 49
False Alarm Calls Police 9 - 7
False Alarm Responses Fire 6 - 49
Fax Machine City Manage
r 2 - 1
Field Marking - Electric Electric Utilit y 4 - 9
12 - 4
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Field Marking - Fiber Electric Utility 4 - 9
Field Marking - Recycled Water Water and Sewer Utilities 11 - 12 Field Marking - Water Water and Sewer Utilities 11 - 12 Field Prep - Football Parks and Recreation 8 - 19
Final Map Checking Fee Engineering 10 - 1
Fingerprinting Police 9 - 4
Fire Alarm Systems Fire 6 - 17
Fire Hydran
t Water and Sewer Utilities 11 - 13
Fire Hydrant Flow Test Water and Sewer Utilities 11 - 8 Fire Pump Installation Fire 6 - 19
Fire Service Water and Sewer Utilities 11 - 6
Fire Service Upgrade Water and Sewer Utilities 11 - 6
First Tent, Canopy or Air Supported Structure Fire 6 - 26 Flat Marker Parks and Recreation 8 - 6
Flood Zone Verification Community Development 3 - 10
Food and Beverage Usage Fee - Library Community Rooms Librar y 7 - 3
Fundraising Events at City Facilities Parks and Recreation 8 - 16 General Plan Amendment Community Development 3 - 8
General Plan/Advance Planning Surcharg
e Community Development 3 - 12
Hazardous Material Tool/Equipment Installation Fire 6 - 20 Hazardous Materials Business Plan Fire 6 - 63
Hazardous Materials Closure Plan Fire 6 - 20
Hazardous Waste Generator Fees Fire 6 - 58
Heritage Tree Removal Community Development 3 - 11
High-Piled Combustible Storage Fire 6 - 21
High-Rise Fire Protection Water Storage Tank Fire 6 - 19 High-Rise R-1 Occupancies Fire 6 - 41
High-Rise Structures Fire 6 - 41
Highly Toxic Materials Fire 6 - 38
Historical & Landmarks Community Development 3 - 11
Hospitals Fire 6 - 45
Hot Tap Water and Sewer Utilities 11 - 12
Hourly Rate (Personnel
) Parks and Recreation 8 - 11
Hourly Staff (As Needed) Assigned to Facility Parks and Recreation 8 - 14 House Move Permit Community Development 3 - 4
ID Card Renewal/Replacement Police 9 - 2
12 - 5
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Industrial/Commercial Facility Stormwater Inspections Street 10 - 16 Installation of a Flower Vase and Ring on a Niche Parks and Recreation 8 - 5 Installation of a Monobar, Emblem, Flower Vase, or Ring on a Crypt Parks and Recreation 8 - 5 Installation of a Niche Plaque Parks and Recreation 8 - 5 Jails Fire 6 - 45
Jury Fees City Manage
r 2 - 4
Licensed Care Inspections Fire 6 - 42
Licensed Care Pre-Inspection Fee Fire 6 - 42
Lick Mill Park Room Rental Parks and Recreation 8 - 13
Light/Ordinary Hazard Occupanc
y Fire 6 - 46
Liquefied Petroleum Gas Fire 6 - 38
Liquefied Petroleum Gases - Installation Per Tank Fire 6 - 21 Load Developmen
t Electric Utility 4 - 3
Lobbying Activities City Clerk 1 - 1
Lot Line Adjustment Processing Engineering 10 - 2
Maps Community Development 3 - 5
Massage Owner Fees Police 9 - 10
Meter Reading More Than Once Per Month Finance 5 - 17
Meter Test Deposit Electric Utilit
y 4 - 5
Methane Venting and Detection Systems Fire 6 - 21
Microfilm Copies Fire 6 - 57
Mileage City Manager 2 - 4
Mills Act Application Community Development 3 - 10
Minor Amendment to Approved Projects Community Development 3 - 11 Minor Modifications Community Development 3 - 2
Miscellaneous Inspections Fire 6 - 48
Motor Funeral Escort - Initial Police 9 - 12
Motor Funeral Escort - Renewal Police 9 - 12
Multi-Story Structures Fire 6 - 48
Municipal Services Information Finance 5 - 16
Non-Exclusive Franchise Hauler Application Fee Street 10 - 21 Non-Renewal of Operational (Annual) Permi
t Fire 6 - 50
Off-Duty Employment Police 9 - 1
Off-Site Parking Permit and Facilities Community Development 3 - 3 Onsite Treatment of Hazardous Waste Annual Fee Fire 6 - 60 Open Burnings Fire 6 - 22
12 - 6
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Operation & Maintenance Inspection of Stormwater Treatment Systems Street 10 - 17 Operational Permits Fire 6 - 29
Organic Peroxides Fire 6 - 39
Ovens Fire 6 - 22
Overdue Fine for Link+ Materials Librar y 7 - 2
Overdue Fines Library 7 - 1
Overdue Fines for Portable Electronic Devices Librar y 7 - 3 Overhead Lines - New Electric Utility 4 - 1
Oversize, Overweight Vehicles Fee Engineering 10 - 14
Oxidizing Materials Fire 6 - 39
Ozone Generator Fire 6 - 22
Parcel Map and Record of Survey Checking Fee Engineering 10 - 1 Park Building Room Rentals Parks and Recreation 8 - 13
Pavement Restoration Street 10 - 18
Pawn/Secondhand Deale
r Police 9 - 14
Pawn/Secondhand Dealer - Renewal Police 9 - 14
Payment Default Fee Finance 5 - 16
Pedi-Cab - Initial Police 9 - 13
Pedi-Cab - Renewal Police 9 - 13
Photo CD's Police 9 - 6
Photocopies Fire 6 - 57
Photographs Fire 6 - 57
Plan Resubmittal Fee Fire 6 - 49
Plan Revision Fee Fire 6 - 49
Police Pay Rate Schedul
e Police 9 - 21
Police Reports Police 9 - 4
Pools - Lifejacket Rental Parks and Recreation 8 - 20
Portable Hydrant Meter and Deposi
t Water and Sewer Utilities 11 - 8
Pre-Application Community Development 3 - 10
Preparation of Agreement/Easement/Grant Deed Engineering 10 - 7 Private Security - Initial Police 9 - 12
Private Security - Renewa
l Police 9 - 12
Property Development Ordinance (Copy of) Engineering 10 - 6 Public Entertainment General Police 9 - 15
Public Fireworks Display and Pyrotechnic Special Effects Us e Fire 6 - 23
Pyrophoric Materials Fire 6 - 39
12 - 7
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Pyrotechnics Special Effects Proximal to Audience Fire 6 - 23 R-1/R-2 Occupancies Fire 6 - 41
Radioactive Materials Fire 6 - 39
Re-Inspection Fee Fire 6 - 50
Record Drawings Archiving Fee Engineering 10 - 6
Recreation Cancellation Fee for Park Buildings, Picnic Areas Parks and Recreation 8 - 17 Recreation Tax (Bedroom) - Additions Engineering 10 - 13 Recreation Tax (Bedroom) - New Construction Permit Engineering 10 - 13 Recycled Hydrant Meter and Deposi
t Water and Sewer Utilities 11 - 8
Refrigeration System Fire 6 - 23
Release of Stored Vehicles Police 9 - 8
Remove and Dispose of Marker and Frame Parks and Recreation 8 - 7 Replacement Fee for Lost Link+ Materials Librar
y 7 - 2
Replacement Fee for Lost or Damaged Library Card Librar y 7 - 1 Replacement for Library Materials Librar y 7 - 1
Repo Fee (Repossessed Vehicles) Police 9 - 9
Reposting of Public Notification Community Development 3 - 5 Residential Development Park Dedication In-Lieu Fees Parks and Recreation 8 - 21 Residential Parking Permit Police 9 - 8
Resource Fees Fire 6 - 7
Review of Agreements and Easements Engineering 10 - 8
Rezoning Community Development 3 - 1
Roadway
s Fire 6 - 24
Room Rental Processing and Set Up Fee Librar y 7 - 3
Sanitary Sewer Capacity Model Run Fee Engineering 10 - 10 Sanitary Sewer Outlet Charge Engineering 10 - 9
Sanitary Sewer Outlet Charge - Conveyance Fee Engineering 10 - 10 Saturday Service Parks and Recreation 8 - 11
School Fire 6 - 44
Second Response Ordinance Police 9 - 2
Security Deposit for Surve
y Engineering 10 - 3
Security Deposit for Survey - City Standard Street Engineering 10 - 3 Senior Citizens Center Parks and Recreation 8 - 15
Service Disconnection at the Pole/Weatherhead Electric Utilit y 4 - 6 Service Fee Customer - Owned Equipment Problem Electric Utilit y 4 - 7 Service Reconnection at the Pole/Weatherhead Electric Utilit y 4 - 6 12 - 8
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Service Removal Electric Utility 4 - 7
Service Turn-On Fee Finance 5 - 15
Service Wire Relocation - Additional Linework Electric Utilit y 4 - 5
Service Wire Relocation from Mid-Span Electric Utilit y 4 - 4 Service Wire Relocation from Pole Electric Utilit y 4 - 4 Sewer Lateral Cleanout Water and Sewer Utilities 11 - 14 Sewer Lateral Installation Water and Sewer Utilities 11 - 15 Sewer Lateral Point Repai
r Water and Sewer Utilities 11 - 16
Sewer Lateral Video Inspection Water and Sewer Utilities 11 - 16 Signs Community Development 3 - 9
Single or Double Upright Monument Foundation Parks and Recreation 8 - 7 Smoke Control System Fire 6 - 24
Solar Domestic Hot Water System Installation Fee Water and Sewer Utilities 11 - 18 Solar Domestic Hot Water System Panel Removal and Replacement Fee Water and Sewer Utilities 11 - 18 Solar Pool Heating System Installation Fe
e Water and Sewer Utilities 11 - 18
Solar Pool Heating System Panel Removal and Replacement Fee Water and Sewer Utilities 11 - 19 Solicitor/Peddler Police 9 - 11
Solicitor/Peddler Renewal Police 9 - 11
Special Event Application Fe
e Parks and Recreation 8 - 20
Special Fire Hydrant Water and Sewer Utilities 11 - 6
Special Outdoor Event on City Property City Manager 2 - 4 Standard Details (Copy of) Engineering 10 - 6
Standard Specifications (Copy of) Engineering 10 - 6
Standpipe Systems Fire 6 - 24
State Certified Massage Fees Police 9 - 10
State of California Annual Surcharges Fire 6 - 61
Storage or Refuse Bins on City Stree
t Engineering 10 - 14
Storage Tanks - Hazardous Materials Fire 6 - 25
Storm Drain Outlet Charge Engineering 10 - 8
Storm Outlet Charge Engineering 10 - 8
Stormwater Management Plan Revie
w Community Development 3 - 11
Street Tree Planting Street 10 - 19
Street Tree Removal Street 10 - 19
Subdivision Code (Copy of) Engineering 10 - 6
Subpoena Fees City Manager 2 - 3
Taxicab Company Police 9 - 3
12 - 9
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Taxicab Company Renewal Police 9 - 3
Taxicab Driver Police 9 - 3
Taxicabs Police 9 - 4
Teen Center Room Rental Parks and Recreation 8 - 19
Temporary Pole Connection Electric Utilit
y 4 - 3
Temporary Power Electric Utility 4 - 4
Time Extensions Community Development 3 - 12
Time of Use Meter Installation Electric Utilit y 4 - 8
Tow Driver Renewal Police 9 - 2
Tow Drivers Police 9 - 2
Toxic Materials Fire 6 - 40
Traffic Flow Map Engineering 10 - 14
Traffic Impact Fee Engineering 10 - 13
Training Fees Fire 6 - 1
Transfer of Interment Rights Parks and Recreation 8 - 8 Transient Occupancy Tax Finance 5 - 2
Underground - Existing Electric Utilit
y 4 - 2
Underground - New Electric Utility 4 - 1
Underground and Above Ground Tank Installations Fire 6 - 25 Underground and Above Ground Tank Modifications Fire 6 - 26 Underground and Above Ground Tank Removals Fire 6 - 25
Underground Fire Service Systems Fire 6 - 27
Undergournd Hazardous Materials Tank Fire 6 - 63
Underground Street Light Relocation Electric Utilit
y 4 - 4
Unstable (Reactive) Materials Fire 6 - 40
Use Permits Community Development 3 - 4
Using Library Meeting Room Librar
y 7 - 3
Utility Billing Splitting or Combining Accounts Finance 5 - 16 Utility Service Deposit Finance 5 - 15
Variance Community Development 3 - 2
Vault Disposal Parks and Recreation 8 - 8
Verification of Electric Meter Address Finance 5 - 16
VIN Verification Fee Police 9 - 13
Wastewater Treatment Plant Capacity Fee Water and Sewer Utilities 11 - 17 Water and Fire Services Water and Sewer Utilities 11 - 13 Water Distribution Main (Front Footage Fee) Water and Sewer Utilities 11 - 3 12 - 10
Fee Section Page No.
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E Alphabetical Listing by Fee
Water Meter and Backflow Preventer Water and Sewer Utilities 11 - 3 Water Meter Test Water and Sewer Utilities 11 - 8
Water Reactive Materials Fire 6 - 40
Water Reconnection Fee - Normal Reconnection Water and Sewer Utilities 11 - 10 Water Service Water and Sewer Utilities 11 - 1
Water Service Abandonment Water and Sewer Utilities 11 - 11 Water Service Relocation Water and Sewer Utilities 11 - 11 Water Supply Assessment Preparation Water and Sewer Utilities 11 - 10 Watershed Map Engineering 10 - 7
Youth Activity Center Room Rental Fee
s Parks and Recreation 8 - 15
Youth Soccer Park Parks and Recreation 8 - 18
Zoning Code Text Amendment Community Development 3 - 1
Zoning Verification Community Development 3 - 10
12 - 11
C I T Y O F S A N T A C L A R A M U N I C I P A L F E E S C H E D U L E This page intentionally left blank.
12 - 12
Municipal Fee Schedule
Resolution
13 - 1
13 - 2
13 - 3
13 - 4