Ebix Insurance No. S200004390
AMENDMENT NO. 3
TO THE AGREEMENT FOR SERVICES
BETWEEN THE
CITY OF SANTA CLARA, CALIFORNIA,
AND
PERFORMANCE MECHANICAL, INC.
PREAMBLE
This agreement ("Amendment No. 3") is entered into between the City of Santa Clara, California, a chartered California municipal corporation (City) and Performance Mechanical, Inc., a California corporation, (Contractor). City and Contractor may be referred to individually as a "Party" or collectively as the "Parties".
RECITALS
A. The Parties previously entered into an agreement entitled "Agreement for Services between the City of Santa Clara, California, and Performance Mechanical Inc.", dated September 16, 2021 (Agreement) for the purpose of having Contractor provide as-needed 8oilermaker/Pipefitter and Welding Services;
8. The Agreement was previously amended by Amendment No. 1, dated January 6, 2023 and Amendment No. 2, dated December 15, 2023. The Agreement and all previous amendments are collectively referred to herein as the "Agreement as Amended"; and
C. The Parties now wish to amend the Agreement as Amended to update the rates.
NOW, THEREFORE, the Parties agree as follows:
AMENDMENT TERMS AND CONDITIONS
1. Exhibit 8-1 Rate Schedule to the Agreement as Amended shall be deleted and replaced with Exhibit 8-1 Rate Schedule -Amended August 1, 2024, attached hereto, and incorporated into the Agreement as Amended.
2. Except as set forth herein, all other terms and conditions of the Agreement as Amended shall remain in full force and effect. In case of a conflict in the terms of the Agreement as Amended and this Amendment No. 3, the provisions of this Amendment No. 3 shall control.
[SIGNATURES ON FOLLOWING PAGE]
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/19
The Parties acknowledge and accept the terms and conditions of this Amendment No. 3 as evidenced by the following signatures of their duly authorized representatives.
CITY OF SANTA CLARA, CALIFORNIA
a chartered California municipal corporation
Approved as to Form: Dated: g / , ( Q.-Dc2'f -------~------ JJa11 (et '{;att(11 Daniel Ballin (Jul 30, 202417:21 PDT) GLEN R. GOOGINS
City Attorney
JO
• 3/
\/ ~ M
~ nager (bh D. GROGAN ;1 ~ City of Santa Clara
1500 Warburton Avenue
Santa Clara, CA 95050
Telephone: (408) 615-2210
Fax: (408) 241-6771
"CITY"
PERFOMANCE MECHANICAL, INC.
a California corporation
'~ Dated: 'l I ~ o 2.~ e
By (Signature)~,,/
Name: CHR IAN U · MO
Title: Estimating Manager
Principal Place of 701 Willow Pass Road, Suite 2
Business Address: Pittsburg, CA 94565
Email Address: [email protected]
Telephone: (925) 432-4080
Fax: (925)432-41414
"CONTRACTOR"
Amendment No. 3 to AgreemenUPerformance Mechanical, Inc.
Rev. 10/25/2019
EXHIBIT B-1 RATE SCHEDULE -AMENDED AUGUST 1, 2024
LABOR RATES - EFFECTIVE JULY 1, 2024
STRAIGHT
CLASSIFICATION TIME
BOILERMAKERS
JOURNEYMAN 147.27
TUBE WELDER 154.00
ASST FOREMAN 151.67
FOREMAN 156.06
GENERAL FOREMAN 169.25
SUPERINTENDENT 180.23
HELPER 75.12
APPR 1 120.90
APPR2 125.29
APPR3 129.69
APPR4 134.08
APPR5 138.48
APPR6 142.87
CARPENTERS
JOURNEYMAN 140.40
FOREMAN 149.56
GENERAL FOREMAN 169.73
LABORERS
JOURNEYMAN 96.10
FOREMAN 101.50
GENERAL FOREMAN 107.45
MILLWRIGHTS
JOURNEYMAN 142.49
FOREMAN 150.37
GENERAL FOREMAN 155.38
SUPERINTENDENT 165.85
APPR 1 79.32
APPR2 89.03
APPR3 98.15
APPR4 102.74
APPR5 124.13
APPR6 128.72
APPR 7 133 .31
APPR8 137.90
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/19
OVERTIME
197.79
207.23
203.95
210.11
228.60
244.00
98.00 160.82
166.99
173 .15
179.31
185.47
191.63
177.24
190.09
218.36
117 .82
125.40
133.74
179.39
190.43
197.46
212.13
101.45
113.02
123.98
130.42
153.65
160.08
166.52
172.95
DOUBLE TIME
248.31
260.45
256.24
264.17
287.95
307.77
120.89
200.75
208.68
216.60
224.53
232.46
240.39
214.07
230.61
266.98
139.55
149.30
160.03
216.28
230.49
239.53
258.42
123.59
137.00
149.81
158.09
183.16
191.44
199.72
208.00
STRAIGHT
CLASSIFICATION TIME
PIPEFITTERS - FIELD
JOURNEYMAN 177.37
ALLOY WELDER 186.17
FOREMAN 193.88
GENERAL FOREMAN 201.59
SUPERINTENDENT 212.59
APPR 1 75.66
APPR2 81.17
APPR3 122.32
APPR4 127.83
APPR5 133.33
APPR6 138.84
APPR 7 144.34
APPR8 149.85
APPR9 155.35
APPR 10 160.85
PIPEFITTERS - SHOP (PITTSBURG, CA)
JOURNEYMAN 181.90
ALLOY WELDER 190.70
FOREMAN 198.41
GENERAL FOREMAN 206.11
SUPERINTENDENT 217.12
APPR 1 80.19
APPR2 85.69
APPR3 126.85
APPR4 132.36
APPR5 137.86
APPR6 143.37
APPR 7 148.87
APPR8 154.37
APPR9 159.88
APPR 10 165.38
FIELD STAFF
EST/PROJECT MGR 152.00
PROJECT ENGINEER 115.00
FIELD ENGINEER 100.00
SCHEDULER 148.00
QC 144.28
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/2019
OVERTIME DOUBLE TIME
224.86 272.34
237.20 288.23
248.00 302.13
258.81 316.03
274.24 335.88
93.90 112.13
101.61 122.06
147.69 173.06
155.41 182.99
163.13 192.92
170.84 202.85
178.56 212.78
186.27 222.70
193.99 232.63
201.71 242.56
229.38 276.87
241.73 292.76
252.53 306.66
263.34 320.56
278.77 340.41
98.42 116.66
106.14 126.58
152.22 177.59
159.94 187.52
167.65 197.45
175.37 207.38
183.09 217.30
190.80 227.23
198.52 237.16
206.24 247.09
215.00 277.00
160.00 206.00
139.00 178.00
208.00 268.00
203.00 261.00
Page4
STRAIGHT
CLASSIFICATION TIME
SAFETY 123.00
TIMEKEEPER 60.00
CLERICAL 54.00
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/2019
OVERTIME DOUBLE TIME
FIELD STAFF
172.00 221.00
84.00 107.00
74.00 95.00
EXHIBIT B-1 RATE SCHEDULE -AMENDED DECEMBER 1, 2023
TOOLS AND EQUIPMENT RATES - EFFECTIVE JULY 1, 2023
DESCRIPTION DAILY
ROLLING EQUIPMENT
DUMP-TRUCK, 2 AXLE*
FLATBED TRUCK, 1 TON*
FLATBED TRUCK, 5-TON *
FORKLIFT, 5000#, INDUSTRIAL PNEUMATIC*
FORKLIFT, 5 TON, (GRADALL or LULL)*
BACKHOE, CASE 580 OR EQUAL *
EXTENSION BOOM FOR FORKLIFT
MANUAL MECHANICAL LIFT (HYLIFT)
TRASH HOPPER FOR FORKLIFT
MAN BASKET FOR CRANE
PICKUP TRUCK WITH RACK
CONTRACTORS UTILITY TRUCK (CIVIL WORK)
IRONWORKER CREW TRUCK, incl welder
PIPEFITTER WELDER TRUCK, incl welder
ELECTRIC CART
UTILITY VEHICLE (JOHN DEERE GATOR)
PIPE WAGON
TRAILER W/500 GALLON WATER TANI(
FIRE MARSHALL STATE LANDS HYDRO TEST
TRAILER
MISCELLANEOUS EQUIPMENT:
HYDRO TEST PUMP, AIR (LOW PRESSURE)
HIGH PRESSURE WASHER & TESTER
TRASH PUMP HOMELITE I MULTI QUIP
METAL GANG BOX
MULTI-TON ROLLERS (SET 4)
LIGHT TOWER
TEST PUMP - GAS POWERED/HIGH VOLUME
WALKIE-TALKIE, INTRINSICALLY SAFE (EA.)
HOLIDAY DETECTOR
GRASSHOPPER
UNI-HYDRO IRONWORKER
HEPA VACUUM CLEANER
DIGIT AL VIBRATION METER W / PROBE
CALIBRATION & RECORDING EQUIPMENT
MQ 45 GENERATOR
GASGENERATOR,HONDA/YAMAHA
LASER ALIGNMENT EQUIPMENT (ROT ALIGN)
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/2019
WEEKLY
290.00 875.00
205.00 610.00
255.00 765.00
215.00 640.00
405.00 1,210.00
355.00 1,040.00
20.00 65.00
35.00 100.00
20.00 65.00
20.00 60.00
180.00 550.00
230.00 700.00
300.00 900.00
300.00 900.00
65.00 200.00
80.00 250.00
60.00 180.00
75.00 230.00
550.00 1,650.00
40.00 100.00
100.00 300.00
40.00 100.00
10.00 30.00
20.00 60.00
88.00 303.00
85.00 255.00
17.00 50.00
40.00 120.00
25.00 75.00
75.00 225.00
20.00 60.00
40.00 100.00
350.00 1,000.00
140.00 400.00
90.00 260.00
300.00 900.00
MONTHLY
2,650.00
1,850.00
2,315.00
1,950.00
3,650.00
3,150.00
200.00
300.00
200.00
120.00
1,650.00
2,100.00
2,700.00
2,700.00
600.00
750.00
550.00
700.00
3,630.00
300.00
900.00
300.00
90.00 180.00
650.00
765.00
150.00
360.00
225.00
675.00
180.00
300.00
1,924.00
1,250.00
780.00
2,700.00
DESCRIPTION DAILY WEEKLY MONTHLY
PNEUMATIC I HYDRAULIC TORQUE WRENCH 330.00 1,000.00 3,000.00 -includes pump, drives (1/2",l" and 1 1/2") and sockets WIRE MICROMETER HEADSET ALIGNMENT KIT 150.00 500.00 1,500.00 FARO 3D LASER SCANNER 400.00 1,200.00 3,600.00
-includes Laptop Computer and reference spheres
PORTABLE HEATER 35.00 100.00 300.00
AIR COMPRESSORS AND ACCESSORIES:
125 CFM - DIESEL FUEL * 120.00 365.00 1,080.00
150 CFM- DIESEL FUEL* 130.00 390.00 1,200.00
EXTRA 50' 3/4" HOSE 5.00 20.00 40.00
AIR TOOLS:
AIR DRILL ROCK, 30# 45.00 180.00 400.00
AIR DRILL ROCK, 60# 45.00 180.00 400.00
PAVEMENT BREAKER, 60# 25.00 85.00 225.00
PAVEMENT BREAKER, 90# 25.00 85.00 225.00
AIR TAMPER 30.00 90.00 270.00
FEIN AIR SAW 44.00 136.00 340.00
HD IMPACT WRENCH, 1/2" 25.00 85.00 225.00
HD IMPACT WRENCH, 3/4" 30.00 120.00 250.00
BUSHING GUN 25.00 85.00 225.00
RIVET BUSTER 25.00 85.00 225.00
COPPUS AIR BLOWER (24" DIA) 30.00 95.00 280.00
ELECTRIC TOOLS:
BENCH GRINDER 15.00 45.00 135.00
MAG BASE DRILL MOTOR (HOUGEN) (DRILL 75.00 225.00 675.00
BITS FOR HOUGEN MUST BE PURCHASED BY
CLIENT)
MAGNETIC DRILL MOTOR 45.00 135.00 405.00
BAND SAW (WILTON) 25.00 75.00 225.00
HOISTS & JACKS:
BOTTLE JACK 15.00 45.00 135.00
CHAIN FALL, 2 TON 20.00 50.00 150.00
CHAIN FALL, 5 TON 22.00 66.00 180.00
CM PULLER, 1 1/2 TON 10.00 30.00 90.00
CM PULLER, 3 TON 22.00 66.00 180.00
GEAR PULLER, HYDRAULIC 60.00 180.00 540.00
GRIP HOIST, 1 1/2 TON 20.00 50.00 150.00
HYDRAULIC JACK, 25 TON 20.00 60.00 120.00
HYDRAULIC JACK, 50 TON 40.00 120.00 280.00
PORT-A-POWER, 25 TON 40.00 120.00 360.00
PORT-A-POWER, 50 TON 60.00 180.00 540.00
PUSH-PULL MECHANICAL JACK 15.00 45.00 135.00
RAM-SET POWER DRIVE 20.00 50.00 150.00
Amendment No. 3 to Agreement/Performance Mechanical, Inc. Page 7 Rev. 10/25/2019
DESCRIPTION DAILY WEEKLY MONTHLY
SCREW JACK, 20 TON 20.00 60.00 120.00
INFLATABLE JACK SYSTEM 12 TON (POWER TEAM) 266.00 798.00 1,995.00 PIPE TOOLS:
TABLE SAW 20.00 60.00 180.00
POWER MITER SAW 15.00 55.00 160.00
PORTABLE POWER PANEL 40.00 80.00 160.00
TEE DRILL* 25.00 75.00 225.00
DIE W/UNIVERSAL 2 1/2"-4" 30.00 90.00 270.00
535 PIPE THREADING MACHINE 100.00 300.00 900.00
BONDSTRANDSHAVER 25.00 75.00 225.00
1224 PIPE THREADING MACHINE 125.00 375.00 1125.00
FLASH CUTOFF SAW, ELECTRIC 50.00 125.00 250.00
FLASH CUTOFF SAW, GAS 80.00 240.00 720.00
HAND THREADER, ELEC (TO 2") 12.00 36.00 108.00
LINED PIPE END PREP EQUIP FOR POLY PRO & 60.00 180.00 540.00 TEFLON
PIPE MULE 25.00 75.00 225.00
PIPE BEVELING MACHINE & ATTACHMENTS 80.00 240.00 720.00 GEORGE FICSHER STAINLESS PIPE BEVELOR 140.00 430.00 1300.00 920 ROLL GROOVER 165.00 500.00 1500.00
CLAMSHELL AFC 10 SEVER AND BEVEL 250.00 750.00 2200.00
MACHINE
10" - 54" REFORMING CLAMPS (Dearman Clamps) 75.00 250.00 750.00 lK Positioner 130.00 400.00 1200.00
WELDING EQUIPMENT:
CARBON ARC 12.00 36.00 108.00
OXY & ACETYLENE W/CART & 50' OXY HOSE 40.00 120.00 360.00 ELECTRIC WELDER, 130XP 35.00 105.00 315.00
ELECTRIC WELDER, 250 AMP 40.00 120.00 360.00
ELECTRIC WELDER, 8 PAC 110.00 440.00 1,320.00
ELECTRIC WELDER, 4 PAC 80.00 240.00 720.00
REMOTE CONTROL UNITS (EACH) 7.00 14.00 42.00
REMOTE CONTROL EXTENSION 20.00 60.00 125.00
WELDER, 250 AMP (DIESEL) 150.00 350.00 1,000.00
WELDING CART 150.00 350.00 1,000.00
HELIARC OUTFIT 16.00 48.00 144.00
PIPE BEVEL CUTTER (SPLIT TO SIZES) 22.00 66.00 198.00
PLASMA ARC CUTTING MACHINE 100.00 300.00 900.00
WELDING TABLE WNISE 10.00 30.00 90.00
THERMAL ARC 130S TIG WELDER 40.00 120.00 360.00
LN 25 MIG WELDER 60.00 180.00 450.00
MILLER XMT 3 04 40.00 120.00 360.00
STUD WELDER 100.00 400.00 1,200.00
Amendment No. 3 to Agreement/Performance Mechanical, Inc. Page 8 Rev. 10/25/2019
DESCRIPTION DAILY WEEKLY
SUPERFLEX RAIL CUTTING SYSTEM 110.00 330.00
CIVIL ACCESSORIES:
GEORGIA BUGGIE 15.00 45.00
BUILDERS LEVEL 30.00 95.00
CEMENT MIXER, GAS 1/4 YD * 50.00 155.00
CONCRETE VIBRATOR, 110 VOLT 37.00 140.00
LASER-LEVEL W/TRIPOD AND TARGET 72.00 216.00
OPTICAL LEVEL 65.00 195.00
VIBRAPLATE 66.00 264.00
WACKERCVR-100 70.00 280.00
CONCRETESLABSAW(BLADESNOT 65.00 215.00
INCLUDED)*
HILTI FASTENER 12.00 40.00
CLAY BLADE 75.00 300.00
BARRICADES 1.00
POWDER ACTIVATED ANCHOR BOLT KIT 35.00 100.00
SAFETY EQUIPMENT
TRI POD RESCUE SYSTEM 60.00 240.00
SCBA - SCOTT AIR PACK 40.00 160.00
FALL PROTECTION RETRACTABLE LANYARD 40.00 160.00
CONFINED SP ACE KIT 100.00 300.00
FRESH AIR SET UP (FOR 2 MEN) 75.00 225.00
5 MINUTE SCBA ESCAPE PACK 40.00 100.00
ESCAPE RESPIRATOR 21.32 (SINGLE USE ITEM)
H2S PERSONNEL MONITOR 5.00 20.00
TMX412, FOUR GAS MONITOR (LEL, 02, CO, 80.00 240.00
H2S)
PORTABLE HEPA VENTILATION VACUUM 30.00 100.00
COOL VESTS 10.00 40.00
JOB SHACKS & TRAILERS: **
20' TOOL TRAILER 200.00
20' CYAN
40' C-VAN
JOB SHACK 8 X 12
JOB SHACK 8 X 16
JOB SHACK 10 X 16
JOB SHACK 10 X 24
* MINIMUM 4-HOUR RENTAL WITH ONE HOUR MOVE-IN/MOVE-OUT TIME ** TRANSPORTATION BILLED SEPARATELY
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/2019
MONTHLY
1,000.00
105.00
250.00
470.00
280.00
648.00
585.00
594.00
700.00
600.00
150.00
1,300.00
300.00
700.00
400.00
400.00
900.00
650.00
300.00
60.00 720.00
300.00
120.00
600.00
200.00
300.00
200.00
200.00
250.00
300.00
EXHIBIT B-1 RATE SCHEDULE -AMENDED DECEMBER 1, 2023
LABOR RATES - EFFECTIVE JULY 1, 2023 - JUNE 30, 2024
STRAIGHT OVERTIME DOUBLE TIME
CLASSIFICATION TIME
BOILERMAKERS
JOURNEYMAN 142.53
ASST FOREMAN 144.32
FOREMAN 146.11
GENERAL FOREMAN 162.34
SUPERINTENDENT 172.24
HELPER 61.86
APPR 1 118.76
APPR2 122.72
APPR3 126.68
APPR4 130.64
APPR5 134.61
APPR6 138.57
CARPENTERS
JOURNEYMAN 133.69
FOREMAN 142.34
GENERAL FOREMAN 161.37
LABORERS
JOURNEYMAN 92.62
FOREMAN 97.85
GENERAL FOREMAN 103.60
MILLWRIGHTS
JOURNEYMAN 135.81
FOREMAN 143.69
GENERAL FOREMAN 148.70
SUPERINTENDENT 158.65
APPR 1 76.21
APPR2 85.22
APPR3 94.08
APPR4 98.41
APPR5 118.49
APPR6 122.82
APPR 7 127.15
APPR8 131.48
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/2019
189.37 236.21
191.88 239.44
194.39 242.67
217.14 271.94
231.03 289.81
79.42 96.97
156.05 193.33
161.60 200.48
167.15 207.63
172.71 214.77
178.26 221.92
183.82 229.06
168.45 203.20
180.57 218.80
207.25 253.12
113.63 134.63
120.95 144.06
129.01 154.43
170.63 205.44
181.67 219.65
188.69 228.69
202.65 246.64
97.09 117.98
107.85 130.48
118.45 142.82
124.52 150.63
146.34 174.19
152.41 182.00
158.48 189 .81
164.55 197.63
STRAIGHT
CLASSIFICATION TIME
PIPEFITTERS - FIELD
JOURNEYMAN 171.04
ALLOY WELDER 179.42
FOREMAN 186.76
GENERAL FOREMAN 194.09
SUPERINTENDENT 204.57
APPR 1 108.89
APPR2 114.13
APPR3 118.65
APPR4 123.89
APPR5 129.13
APPR6 134.37
APPR 7 139.61
APPR8 144.85
APPR9 150.09
APPR 10 155.32
PIPEFITTERS - SHOP (PITTSBURG, CA)
JOURNEYMAN 173 .15
ALLOY WELDER 181.53
FOREMAN 188.87
GENERAL FOREMAN 196.20
SUPERINTENDENT 206.68
APPR 1 111.01
APPR2 116.24
APPR3 120.77
APPR4 126.01
APPR5 131.24
APPR6 136.48
APPR 7 141.72
APPR8 146.96
APPR9 152.20
APPR 10 157.44
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/2019
OVERTIME DOUBLE TIME
213.14 255.25
224.89 270.37
235.17 283.59
245.46 296.82
260.14 315.72
126.02 143.15
133.37 152.60
139.71 160.76
147.05 170.21
154.39 179.66
161.74 189 .10
169.08 198.55
176.42 208.00
183.77 217.45
191.11 226.90
215.26 257.36
227.01 272.48
237.29 285.71
247.57 298.94
262.26 317.83
128.13 145.26
135.48 154.71
141.82 162.87
149.16 172.32
156.51 181.77
163.85 191.22
171.19 200.67
178.54 210.12
185.88 219.56
193.23 229.01
STRAIGHT
CLASSIFICATION TIME
FIELD STAFF
EST/PROJECT MGR 149.00
PROJECT ENGINEER 112.00
FIELD ENGINEER 95.00
SCHEDULER 144.00
QC 141.00
SAFETY 120.00
TIMEKEEPER 57.00
CLERICAL 52.00
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/2019
OVERTIME DOUBLE TIME
210.00 271.00
155.00 199.00
132.00 168.00
203.00 261.00
198.00 255.00
167.00 215.00
79.00 101.00
72.00 91.00
EXHIBIT B-1 RATE SCHEDULE -AMENDED DECEMBER 1, 2023
LABOR RA TES - EFFECTIVE JULY 1, 2021 - JUNE 30, 2023
STRAIGHT
CLASSIFICATION TIME
BOILERMAKERS
JOURNEYMAN 135.00
ASST FOREMAN 136.90
FOREMAN 138.80
GENERAL FOREMAN 158.58
SUPERINTENDENT 168.47
HELPER 64.62
APPR 1 112.41
APPR2 116.17
APPR3 119.94
APPR4 123.70
APPR5 127.47
APPR6 131.24
CARPENTERS
JOURNEYMAN 125.21
FOREMAN 133 .18
GENERAL FOREMAN 150.71
LABORERS
JOURNEYMAN 87.37
FOREMAN 90.41
MILLWRIGHTS
JOURNEYMAN 127.66
FOREMAN 134.49
GENERAL FOREMAN 138.28
SUPERINTENDENT 147.35
APPR 1 72.56
APPR2 80.99
APPR3 89.80
APPR4 93.80
APPR5 111.64
APPR6 115 .64
APPR 7 119.65
APPR8 123.65
Amendment No. 3 to AgreemenUPerformance Mechanical, Inc.
Rev. 10/25/19
OVERTIME
180.75
183.41
186.07
213.80
227.66
83.22 149.07
154.35
159.63
164.91
170.19
175.47
157.23
168.41
192.98
107.38
111.63
159.83
169.41
174.73
187.45
91.86 101.91
112.32
117.93
137.38
143.00
148.61
154.22
DOUBLE TIME
226.50
229.92
233.35
269.02
286.86
101.83
185.74
192.53
199.33
206.12
212.91
219.71
189.26
203.64
235.26
127.39
132.86
192.01
204.34
211.18
227.54
111.17
122.83
134.85
142.07
163 .13
170.35
177.57
184.79
STRAIGHT OVERTIME DOUBLE TIME
CLASSIFICATION TIME
PIPEFITTERS - FIELD
JOURNEYMAN 162.17 206.95 251.72
ALLOY WELDER 170.40 218.48 266.56
FOREMAN 175.03 224.97 274.91
GENERAL FOREMAN 184.80 238.66 292.53
SUPERINTENDENT 195.08 253.08 311.08
APPR 1 76.92 94.02 111.12
APPR2 82.06 101.23 120.40
APPR3 110.75 134.86 158.97
APPR4 115.89 142.07 168.24
APPR5 121.03 149.28 177.52
APPR6 126.18 156.48 186.79
APPR 7 131.32 163.69 196.07
APPR8 136.46 170.90 205.34
APPR9 141.60 178.11 214.62
APPR 10 146.74 185.32 223.89
PIPEFITTERS - SHOP (PITTSBURG, CA)
JOURNEYMAN 165 .3 7 210.15 254.92
ALLOY WELDER 173.60 221.68 269.76
FOREMAN 175.66 224.56 273.47
GENERAL FOREMAN 185.94 238.98 292.02
SUPERINTENDENT 196.23 253.40 310.57
APPR 1 80.12 97.22 114.32
APPR2 85.26 104.43 123 .60
APPR3 113.95 138.06 162.17
APPR4 119.09 145.27 171.44
APPR5 124.23 152.48 180.72
APPR6 129.38 159.68 189.99
APPR 7 134.52 166.89 199.27
APPR8 139.66 174.10 208.54
APPR9 144.80 181.31 217.82
APPR 10 149.94 188.52 227.09
FIELD STAFF
EST/PROJECT MGR 147.34 207.76 267.12
PROJECT ENGINEER 111.30 154.76 198.22
FIELD ENGINEER 94.34 129.32 165.36
SCHEDULER 140.98 197.16 254.40
QC 138.86 195.04 251.22
SAFETY 113.42 156.88 201.40
Amendment No. 3 to Agreement/Performance Mechanical, Inc. Page 14 Rev. 10/25/2019
CLASSIFICATION
TIMEKEEPER
CLERICAL
STRAIGHT TIME
57.24 51.94
Amendment No. 3 to Agreement/Performance Mechanical, Inc.
Rev. 10/25/2019
OVERTIME
78.44 71.02
DOUBLE TIME
100.70
90.10
EXHIBIT B-1 RATE SCHEDULE -AMENDED DECEMBER 1, 2023
TOOLS AND EQUIPMENT RATES - EFFECTIVE JULY 1, 2021 -JUNE 30, 2023
DESCRIPTON DAILY WEEKLY MONTHLY
ROLLING EQUIPMENT
DUMP-TRUCK, 2 AXLE* 290.00 875.00 2,650.00
FLATBED TRUCK, 1 TON* 205.00 610.00 1,850.00
FLATBED TRUCK, 5-TON * 255.00 765.00 2,315.00
FORKLIFT, 5000#, INDUSTRIAL PNEUMATIC* 215.00 640.00 1,950.00 FORKLIFT, 5 TON, (GRADALL or LULL)* 405.00 1,210.00 3,650.00 BACKHOE, CASE 580 OR EQUAL * 355.00 1,040.00 3,150.00
EXTENSION BOOM FOR FORKLIFT 20.00 65.00 200.00
MANUAL MECHANICAL LIFT (HYLIFT) 35.00 100.00 300.00
TRASH HOPPER FOR FORKLIFT 20.00 65.00 200.00
MAN BASKET FOR CRANE 20.00 60.00 120.00
PICKUP TRUCK WITH RACK 160.00 480.00 1,450.00
CONTRACTORS UTILITY TRUCK (CIVIL WORK) 210.00 630.00 1,900.00 IRONWORKER CREW TRUCK, incl welder 275.00 825.00 2,475.00 PIPEFITTER WELDER TRUCK, incl welder 300.00 850.00 2,500.00 ELECTRIC CART 65.00 200.00 600.00
UTILITY VEHICLE (JOHN DEERE GATOR) 80.00 250.00 750.00
PIPE WAGON 60.00 180.00 550.00
TRAILER W/500 GALLON WATER TANK 75.00 230.00 700.00
FIRE MARSHALL STATE LANDS HYDRO TEST 500.00 1,470.00 3,334.00 TRAILER MISCELLANEOUS EQUIPMENT:
HYDRO TEST PUMP, AIR (LOW PRESSURE) 40.00 100.00 300.00 HIGH PRESSURE WASHER & TESTER 100.00 300.00 900.00
TRASH PUMP HOMELITE I MULTI QUIP 40.00 100.00 300.00
METAL GANG BOX 10.00 30.00 90.00
MULTI-TON ROLLERS (SET 4) 20.00 60.00 180.00
LIGHT TOWER 88.00 303.00 650.00
TEST PUMP - GAS POWERED/HIGH VOLUME 85.00 255.00 765.00 WALKIE-TALKIE, INTRINSICALLY SAFE (EA.) 17.00 50.00 150.00 HOLIDAY DETECTOR 40.00 120.00 360.00
GRASSHOPPER 25.00 75.00 225.00
UNI-HYDRO IRONWORKER 75.00 225.00 675.00
HEPA VACUUM CLEANER 20.00 60.00 180.00
DIGIT AL VIBRATION METER W / PROBE 40.00 100.00 300.00
CALIBRATION & RECORDING EQUIPMENT 350.00 1,000.00 1,924.00 MQ 45 GENERATOR 140.00 400.00 1,250.00
GAS GENERA TOR, HONDA N AMAHA 90.00 260.00 780.00
LASER ALIGNMENT EQUIPMENT (ROTALIGN) 300.00 900.00 2,700.00
PNEUMATIC I HYDRAULIC TORQUE WRENCH
330.00 1,000.00 3,000.00 -includes pump, drives (1/2",1" and 1 1/2") and sockets WIRE MICROMETER HEADSET ALIGNMENT KIT 150.00 500.00 1,500.00 Amendment No. 3 to AgreemenUPerformance Mechanical, Inc. Page 16 Rev. 10/25/19
DESCRIPTON DAILY WEEKLY MONTHLY
FARO 3D LASER SCANNER
400.00 1,200.00 3,600.00 -includes Laptop Computer and reference spheres PORTABLE HEATER 35.00 100.00 300.00
AIR COMPRESSORS AND ACCESSORIES:
125 CFM - DIESEL FUEL * 120.00 365.00 1,080.00
150 CFM- DIESEL FUEL* 130.00 390.00 1,200.00
EXTRA 50' 3/4" HOSE 5.00 20.00 40.00
AIR TOOLS:
AIR DRILL ROCK, 30# 45.00 180.00 400.00
AIR DRILL ROCK, 60# 45.00 180.00 400.00
PAVEMENT BREAKER, 60# 25.00 85.00 225.00
PAVEMENT BREAKER, 90# 25.00 85.00 225.00
AIR TAMPER 30.00 90.00 270.00
FEIN AIR SAW 44.00 136.00 340.00
HD IMPACT WRENCH, 1/2" 25.00 85.00 225.00
HD IMPACT WRENCH, 3/4" 30.00 120.00 250.00
BUSHING GUN 25.00 85.00 225.00
RIVET BUSTER 25.00 85.00 225.00
COPPUS AIR BLOWER (24" DIA) 30.00 95.00 280.00
ELECTRIC TOOLS:
BENCH GRINDER 15.00 45.00 135.00
MAG BASE DRILL MOTOR (HOUGEN) (DRILL
BITS FOR HOUGEN MUST BE PURCHASED BY 75.00 225.00 675.00
CLIENT)
MAGNETIC DRILL MOTOR 45.00 135.00 405.00
BAND SAW (WILTON) 25.00 75.00 225.00
HOISTS & JACKS:
BOTTLE JACK 15.00 45.00 135.00
CHAIN FALL, 2 TON 20.00 50.00 150.00
CHAIN FALL, 5 TON 22.00 66.00 180.00
CM PULLER, 1 1/2 TON 10.00 30.00 90.00
CM PULLER, 3 TON 22.00 66.00 180.00
GEAR PULLER, HYDRAULIC 60.00 180.00 540.00
GRIP HOIST, 1 1/2 TON 20.00 50.00 150.00
HYDRAULIC JACK, 25 TON 20.00 60.00 120.00
HYDRAULIC JACK, 50 TON 40.00 120.00 280.00
PORT-A-POWER, 25 TON 40.00 120.00 360.00
PORT-A-POWER, 50 TON 60.00 180.00 540.00
PUSH-PULL MECHANICAL JACK 15.00 45.00 135.00
RAM-SET POWER DRIVE 20.00 50.00 150.00
SCREW JACK, 20 TON 20.00 60.00 120.00
INFLATABLE JACK SYSTEM 12 TON (POWER TEAM) 266.00 798.00 1,995.00 PIPE TOOLS:
TABLE SAW 20.00 60.00 180.00
Amendment No. 3 to AgreemenUPerformance Mechanical, Inc. Page 17 Rev. 10/25/2019
DESCRIPTON DAILY WEEKLY MONTHLY
POWER MITER SAW 15.00 55.00 160.00
PORTABLE POWER PANEL 40.00 80.00 160.00
TEE DRILL* 25.00 75.00 225.00
DIE W/UNIVERSAL 2 1/2"-4" 30.00 90.00 270.00
535 PIPE THREADING MACHINE 100.00 300.00 900.00
BONDSTRAND SHA VER 25.00 75.00 225.00
1224 PIPE THREADING MACHINE 125.00 375.00 1125.00
FLASH CUTOFF SAW, ELECTRIC 50.00 125.00 250.00
FLASH CUTOFF SAW, GAS 80.00 240.00 720.00
HAND THREADER, ELEC (TO 2") 12.00 36.00 108.00
LINED PIPE END PREP EQUIP FOR POLY PRO & 60.00 180.00 540.00 TEFLON PIPE MULE 25.00 75.00 225.00
PIPE BEVELING MACHINE & ATTACHMENTS 80.00 240.00 720.00 GEORGE FICSHER STAINLESS PIPE BEVELOR 140.00 430.00 1300.00 920 ROLL GROOVER 165.00 500.00 1500.00
CLAMSHELL AFC 10 SEVER AND BEVEL 250.00 750.00 2200.00 MACHINE 10" - 54" REFORMING CLAMPS (Dearman Clamps) 75.00 250.00 750.00 WELDING EQUIPMENT:
CARBON ARC 12.00 36.00 108.00
OXY & ACETYLENE W /CART & 50' OXY HOSE 40.00 120.00 360.00 ELECTRIC WELDER, 130XP 35.00 105.00 315.00
ELECTRIC WELDER, 250 AMP 40.00 120.00 360.00
ELECTRIC WELDER, 8 PAC 110.00 440.00 1,320.00
ELECTRIC WELDER, 4 PAC 80.00 240.00 720.00
REMOTE CONTROL UNITS (EACH) 7.00 14.00 42.00
REMOTE CONTROL EXTENSION 20.00 60.00 125.00
WELDER, 250 AMP (DIESEL) 150.00 350.00 1,000.00
WELDING CART 150.00 350.00 1,000.00
HELIARC OUTFIT 16.00 48.00 144.00
PIPE BEVEL CUTTER (SPLIT TO SIZES) 22.00 66.00 198.00
PLASMA ARC CUTTING MACHINE 100.00 300.00 900.00
WELDING TABLE WMSE 10.00 30.00 90.00
THERMAL ARC 130S TIG WELDER 40.00 120.00 360.00
LN 25 MIG WELDER 60.00 180.00 450.00
MILLER XMT 3 04 40.00 120.00 360.00
STUD WELDER 100.00 400.00 1,200.00
SUPERFLEX RAIL CUTTING SYSTEM 110.00 330.00 1,000.00
CIVIL ACCESSORIES:
GEORGIA BUGGIE 15.00 45.00 105.00
BUILDERS LEVEL 30.00 95.00 250.00
CEMENT MIXER, GAS 1/4 YD * 50.00 155.00 470.00
CONCRETE VIBRATOR, 110 VOLT 37.00 140.00 280.00
LASER-LEVEL W/TRIPOD AND TARGET 72.00 216.00 648.00
Amendment No. 3 to Agreement/Performance Mechanical, Inc. Page 18 Rev. 10/25/2019
DESCRIPTON DAILY WEEKLY
OPTICAL LEVEL 65.00 195.00
VIBRAPLATE 66.00 264.00
WACKERCVR-100 70.00 280.00
CONCRETESLABSAW(BLADESNOT 65.00 215.00 INCLUDED)*
HILTI FASTENER 12.00 40.00
CLAY BLADE 75.00 300.00
BARRICADES 1.00
POWDER ACTIVATED ANCHOR BOLT KIT 35.00 100.00
SAFETY EQUIPMENT
TRI POD RESCUE SYSTEM 60.00 240.00
SCBA - SCOTT AIR PACK 40.00 160.00
FALL PROTECTION RETRACTABLE LANYARD 40.00 160.00
CONFINED SPACE KIT 100.00 300.00
FRESH AIR SET UP (FOR 2 MEN) 75.00 225.00
5 MINUTE SCBA ESCAPE PACK 40.00 100.00
ESCAPE RESPIRATOR 21.32 (SINGLE USE ITEM)
H2S PERSONNEL MONITOR 5.00 20.00
TMX412, FOUR GAS MONITOR (LEL, 02, CO, 80.00 240.00 H2S) PORTABLE HEPA VENTILATIONVACUUM 30.00 100.00
COOL VESTS 10.00 40.00
JOB SHACKS & TRAILERS:**
20' TOOL TRAILER 200.00
20' C VAN
40' C-VAN
JOB SHACK 8 X 12
JOB SHACK 8 X 16
JOB SHACK 10 X 16
JOB SHACK 10 X 24
* MINIMUM 4-HOUR RENTAL WITH ONE HOUR MOVE-IN/MOVE-OUT TIME ** TRANSPORTATION BILLED SEPARATELY
Amendment No. 3 to AgreemenUPerformance Mechanical, Inc.
Rev. 10/25/2019
MONTHLY
585.00
594.00
700.00
600.00
150.00
1,300.00
300.00
700.00
400.00
400.00
900.00
650.00
300.00
60.00 720.00
300.00
120.00
600.00
200.00
300.00
200.00
200.00
250.00
300.00