Cities Index.
Pacific Crest Park Site Plan

Santa Clarita City Council
October 25, 2022

Document
Pacific Crest Park Site Plan
Meeting
October 25, 2022
Body
Santa Clarita City Council
Original file
2.2 MB
Text extracted from the city's file for reading and search. Open the original on santaclaritacityca.iqm2.com. That file is the official record.

DRAWN BY:CHECKED BY:PROJECT NO.DATE:

DATE2.3.1.

5.4.6.7. REVISIONS

8. SHEET CONTENTS:

SHEET NUMBER:

DRAWING STATUS:P4025PACIFIC CREST PARKSHADE STRUCTURE29051 Garnet Canyon Rd.Santa Clarita, CA 91390 CONSTRUCTION DOCS.
22-07549/19/2022 JWM
330 ARDEN AVENUE, STE 130GLENDALE, CA 91203323.491.3808WWW.JMD-LA.COM JWM
9/19/2022
CONTACTS:MIKE CHOATECity of Santa Clarita661-250-3700LAURA FRANTZENRegional Manager, USA Shade805-249-8153JEFF MAXWELLLandscape Architect, JMD Landscape Architecture323-491-3808 P4025PACIFIC CREST PARKSHADE STRUCTURES
Indicates ADA Path of Travel

AREA MAP

VICINITY
Garnet Canyon Dr.

PLAYGROUNDEQUIPMENT

1.Site plan drawing is for informational purposes only, and not intended toserve as an accurate survey.2.Contractor shall verify all locations, dimensions, and site conditions beforestarting work. Do not willfully proceed with construction when it is obviousthat obstructions exist that may not have been apparent during design andengineering. Notify City Representative before proceeding with constructionin such cases.3.The location of all service runs, such as water supply, irrigation, electrical(overhead and underground), telephone, sanitary sewer, etc. should beascertained before work is started, where they will be affected byexcavation or machines working nearby. Utilities shall be protected. NotifyCity Representative of any conflict with proposed improvements.4.The contractor shall repair or replace, at their own expense, any existingproperty that is damaged as a result of construction.5.Clean up and remove all debris from site prior to requesting final approval.Grade all areas within 0.5 inches of finish grades.

GENERAL NOTES
SHADE STRUCTURE NOTES:1.Shade structure by 'USA Shade,' provided by City.2.See installation details/shop drawings, provided by manufacturer.3.Mark locations of posts/footings and obtain approval from landscapearchitect or City Representative prior to installation.4.Installation of shade structure posts shall not conflict with play equipmentuse zones, as described in the Consumer Product Safety CommissionHandbook for Public Playground Safety, Section 5.a.The distance from the perimeter of stationary play equipment (excludingends of slides, or front of swings) to any shade structure post shall be aminimum of 6'.b.The distance from the exit of a slide to any shade structure post shall bea minimum of 'h' + 4' where 'h' equals the height of the slide at thehighest point of the chute; however, the distance shall be at least 6'.c.At the front or in the rear of a swing set, shade structure posts shall notbe installed within twice the height of the swings, and at least 6' fromswing posts.5.See footing detail, by structural engineer.

NSITEPLANL-1

SEE PLAN VIEW, BELOW
Note:1.Accessible Path of Travel shall not exceed5% slope.2.Cross-slope on Accessible Path of Travelshall not exceed 2%.

← All documents from this meeting