Cities Index.
Agenda packet

Santa Clarita City Council
November 22, 2022

Document
Agenda packet
Meeting
November 22, 2022
Body
Santa Clarita City Council
Pages
8
Original file
19.1 MB
Text extracted from the city's file for reading and search. Open the original on santaclaritacityca.iqm2.com. That file is the official record.

CITY OF SANTA CLARITA

CITY COUNCIL

REGULAR MEETING

Tuesday, November 22, 2022
6:00 PM
City Council Chambers
23920 Valencia Blvd.

Santa Clarita, CA 91355

AGENDA

Joint Meeting with
Board of Library Trustees

How to Address the City Council
Pursuant to Government Code section 54954.3 members of the public are afforded the opportunities to address the City Council. You may address the Council once per meeting during Public Participation on any matter within the Council's jurisdiction that is not listed on the agenda. Public Participation speaker's cards must be submitted to the City Clerk BEFORE this portion of the meeting begins. To address the Council regarding an item on the agenda, please fill out a speaker's card and submit it to the City Clerk BEFORE the Mayor announces the item.

Each person addressing the Council is given three minutes to speak (with double the time allotted to non-English speakers using a translator) indicated by a colored light system on the Council dais. If you wish to provide information to the Council, please present the City Clerk with 10 copies. Otherwise, your materials will simply be added to the official record. Please note use of City Council Chamber technology equipment to present electronic material during meetings is not allowed.
______________________________________________________________________________

In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, please contact the City Clerk's Office, (661) 255-4391. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. (28CFR 35.102-35.104 ADA Title II)

Pursuant to Government Code 54957.5 any writings or documents distributed to a majority of the members of the City Council regarding any open session item on this agenda will be made available for public inspection in the City Clerk’s Office located at 23920 Valencia Boulevard, Suite 120, during normal business hours.

View public meeting agendas here, inclusive of all attachments and reading file material. ______________________________________________________________________________

Page 2 ends

INVOCATION
Weste

CALL TO ORDER

ROLL CALL

FLAG SALUTE

EXECUTIVE MEETING
This time has been set aside for Councilmembers to review the agenda and obtain any further information that may be needed. Council will also discuss each individual item during the course of the meeting with the exception of the Consent Calendar, which may be approved in its entirety by one motion, unless there is a request to pull an item for discussion. No action will be taken on public agenda items during the Executive Meeting.

APPROVAL OF AGENDA

AWARDS AND RECOGNITIONS
Native American Heritage Month Proclamation
Small Business Saturday 2022 Proclamation
Finance Division Recognition for Achievement Awards

PUBLIC PARTICIPATION
This time has been set aside for the public to address the City Council on items NOT listed on the agenda. The City Council will not act upon these items at this meeting other than to review and/or provide direction to staff. All speakers must submit a speaker’s card to the City Clerk PRIOR to the beginning of this portion of the meeting. Thirty minutes are allotted for public input at this time. The FIRST TEN people to submit a speaker card prior to the beginning of Public Participation will be heard.

STAFF COMMENTS

COMMITTEE REPORTS/COUNCILMEMBER COMMENTS

CONSENT CALENDAR
All matters listed under the Consent Calendar are considered routine and will be enacted by one motion by the City Council. The items are not individually discussed by the City Council unless a request is made by a member of the public or the Council, in which case, the item(s) will be removed from the Consent Calendar and will be considered separately.

Page 3 ends

1. APPROVAL OF SPECIAL MEETING MINUTES – The minutes of the City Council are submitted for approval.

RECOMMENDED ACTION:

City Council approve the minutes of the October 25, 2022 Special Meeting.

2. APPROVAL OF REGULAR MEETING MINUTES – The minutes of the City Council are submitted for approval.

RECOMMENDED ACTION:

City Council approve the minutes of the October 25, 2022 Regular Meeting.

3. APPROVAL OF SPECIAL MEETING MINUTES – The minutes of the City Council are submitted for approval.

RECOMMENDED ACTION:

City Council approve the minutes of the October 27, 2022 Special Meeting.

4. CHECK REGISTER NOS. 22 AND 23 - Check Register No. 22 for the Period 09/23/22 through 10/06/22 and 10/13/22. Electronic Funds Transfers for the Period 09/26/22 through 10/07/22. Check Register No. 23 for the Period 10/07/22 through 10/20/22 and 10/27/22. Electronic Funds Transfers for the Period 10/10/22 through 10/21/22.

RECOMMENDED ACTION:

City Council approve and ratify for payment the demands presented in Check Register Nos. 22 and 23.

5. LOCAL APPOINTMENTS LIST/DECLARING VACANCIES - Terms of various Local Appointments will expire on December 31, 2022, and January 8, 2023. This item will initiate the process to fill these vacancies.

RECOMMENDED ACTION:

City Council:

1. Approve the Local Appointments List.

2. Declare vacancies on the Planning Commission; Parks, Recreation and Community Services Commission; Arts Commission; Open Space Preservation District Financial Accountability and Audit Panel; and Greater Los Angeles County Vector Control Board.

3. Approve a four-year term for the City’s appointment to the Greater Los Angeles County Vector Control Board; and

4. Approve the recruitment process for the vacancies.

Page 4 ends

6. AUTHORITY TO EXECUTE AN AGREEMENT WITH THE COUNTY OF LOS ANGELES FOR THE CITY OF SANTA CLARITA'S FISCAL YEAR 2022-23 MEASURE H ALLOCATION - City Council to consider approval of a contract with Los Angeles County to receive Measure H funding for the construction of Family Promise of Santa Clarita Valley's interim housing facility and for a Homeless Coordinator to implement the 2022 Community Plan to Address Homelessness.

RECOMMENDED ACTION:

City Council:

1. Approve a one-year contract with Los Angeles County to receive Measure H funding in the amount of $193,443 to assist with the construction of Family Promise of Santa Clarita Valley’s interim housing facility and for a Homeless Services Coordinator to implement the 2022 Community Plan to Address Homelessness.

2. Increase revenue account 272-462101 by $193,443, and appropriate $18,314 to expenditure account 2723205-500201 and $175,129 to expenditure account 2723205- 516101.

3. Authorize the City Manager to execute an agreement with Family Promise of Santa Clarita Valley in an amount not to exceed $175,129 to provide funding towards the construction of an interim housing facility in the Newhall community.

4. Authorize the City Manager or designee to execute all contracts and associated documents, and make non-material amendments that may arise, subject to City Attorney approval.

7. APPROVAL OF A RESIDENTIAL CONTINUATION RIGHTS SOLID WASTE

SERVICE AGREEMENT FOR THE PROPOSED ANNEXATION AREA OF
TESORO DEL VALLE - Continuation rights residential solid waste agreement between the City of Santa Clarita and Burrtec Waste Industries, Inc., for the proposed annexation area of Tesoro Del Valle.

RECOMMENDED ACTION:

City Council adopt a resolution approving an agreement for the continuation rights for residential solid waste collection for the Tesoro Del Valle annexed area of Santa Clarita; and approve and authorize the City Manager or designee to execute a continuation rights residential solid waste agreement with Burrtec Waste Industries, Inc., for the proposed annexation area of Tesoro Del Valle, subject to City Attorney approval.

8. AMEND CONTRACT FOR INVASIVE PLANT REMOVAL - Contract with Wildscape Restoration, Inc., for the removal of invasive plants.

RECOMMENDED ACTION:

City Council:

1. Amend the existing contract with Wildscape Restoration, Inc., to increase the scope of work for invasive plant removal and authorize an expenditure authority increase in the amount of $50,000, for a total contract amount not to exceed $99,760.

Page 5 ends

2. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.

9. SANTA CLARITA SPORTS COMPLEX BUILDOUT, PROJECT F3024 - AWARD DESIGN CONTRACT - This item will fund the design for the expansion of the southeastern portion of the Santa Clarita Sports Complex. This expansion will feature the addition of three full-sized multipurpose fields and one multipurpose field for twelve and under youth sports. This project will also incorporate a 400-meter running track, a destination inclusive playground, bike park, dog park, open space trails, sand volleyball courts, picnic shelters, a restroom building, and additional parking.

RECOMMENDED ACTION:

City Council:

1. Award a design contract to Kimley-Horn and Associates, Inc., for the Santa Clarita Sports Complex Buildout, Project F3024, in the amount of $3,049,816 and authorize a contingency in the amount of $304,982, for a total contract amount not to exceed $3,354,798.

2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.

10. SUMMARY VACATION OF EASEMENTS FOR SLOPE AND STREET

PURPOSES LOCATED ON THE WEST SIDE OF SIERRA HIGHWAY, SOUTH OF NEWHALL AVENUE (SIERRA WEST ASSISTED LIVING ) - Pursuant to Section 8331 of the Streets and Highways Code of the State of California, summarily vacate easements for slope and street purposes at the site of the approved Sierra West Assisted Living on the west side of Sierra Highway, south of Newhall Avenue.

RECOMMENDED ACTION:

City Council:

1. Adopt a resolution for the summary vacation of an easement for slope purposes as described and shown on Exhibit “A” Legal Description and Exhibit “B” Exhibit Map of the attached resolution, and an easement for street purposes as described and shown on Exhibit “C” Legal Description and Exhibit “D” Exhibit Map of the attached resolution.

2. Direct City Clerk to record the certified original resolution in the County of Los Angeles Registrar-Recorder’s office.

Page 6 ends

11. PROCUREMENT OF ICE COVERINGS FOR EVENTS HOSTED AT THE CUBE – ICE AND ENTERTAINMENT CENTER - Consideration of the purchase of professional grade ice coverings for The Cube - Ice and Entertainment Center, to allow for the hosting of non-ice events.

RECOMMENDED ACTION:

City Council:

1. Approve the “piggyback” purchase and installation of portable ice coverings using Sourcewell contract #120320-ATH-1 with Becker Arena Products, Inc., in the amount of $207,314, and authorize a contingency of $20,732, for a total contract amount not to exceed $228,046.

2. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.

12. SEASONS BROCHURE PRINTING AND DISTRIBUTION CONTRACT - Award a contract for the printing and mail preparation of the City of Santa Clarita SEASONS magazine, which provides listings of sports, programs, contract classes, and recreation offerings, as well as information about what is happening in the City of Santa Clarita.

RECOMMENDED ACTION:

City Council:

1. Award a one-year contract to QWP Direct Mail Services, Inc., with up to three additional one-year renewal options beginning in year two, for the printing and mail preparation of the SEASONS magazine in an amount not to exceed $278,669; and authorize a contingency of $27,867 for a total annual amount not to exceed $306,536, plus an adjustment consistent with the appropriate Consumer Price Index, upon request of the contractor.

2. Increase Brochure expenditure budget 1005102-510104 by $120,214 in fiscal year 2022-23 and $140,571 ongoing budget in fiscal year 2023-24, plus the cost of any Consumer Price Index increase.

3. Authorize the City Manager or designee to execute up to three additional one-year renewal options beginning in year two, not to exceed the annual contract amount plus an adjustment consistent with the appropriate Consumer Price Index, upon request of the contractor.

4. Authorize the City Manager or designee to execute all contracts and associated documents, and modify the awards in the event impossibility of performance arises, and execute all documents subject to City Attorney approval.

Page 7 ends

13. CENTRAL PARK - CIVIC ART PROJECT - A contract for the Civic Art Project included with the Central Park Buildout Project.

RECOMMENDED ACTION:

City Council:

1. Award a contract to Sujin Lim in the amount of $85,000 for the public art piece, “When Cloud Met a Cloud,” to be located at Central Park.

2. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.

14. PUBLIC ART PLANNING AND SELECTION PROCESS UPDATE - Revisions to the Public Art Planning and Selection Process to create additional efficiencies and expedite the review process.

RECOMMENDED ACTION:

City Council approve updates to the Public Art Planning and Selection Process.

15. FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE WITH LOCAL AMENDMENTS - This ordinance adopts the 2022 California Building Standards Code with an effective date of January 1, 2023, as required by State law and also adopts local amendments to the State codes establishing higher standards for structural and fire protection in new buildings based on local climatic, geologic, and topographical conditions, floodplain management regulations, as well as administrative provisions for enforcement of the codes at the local level.

RECOMMENDED ACTION:

City Council introduce an ordinance entitled “AN ORDINANCE OF THE CITY

COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, REPEALING AND REPLACING TITLES 18 THROUGH 22, TITLE 24, AND CHAPTER 25.01 OF TITLE 25; AND ADOPTING BY REFERENCE THE 2022 CALIFORNIA

ADMINISTRATIVE, BUILDING, RESIDENTIAL, ELECTRICAL, MECHANICAL,

PLUMBING, ENERGY, EXISTING BUILDING, HISTORICAL BUILDING, FIRE,

GREEN BUILDING STANDARDS, AND REFERENCED STANDARDS CODES WITH CERTAIN APPENDICES AND LOCAL AMENDMENTS;” waive reading of text and consent to read by title only as listed on the agenda; pass to second reading; and set the public hearing for December 13, 2022.

PUBLIC PARTICIPATION
This time has been set aside for any speakers that have turned in speaker cards and were not heard in the first thirty minutes allotted to address the City Council on items that are NOT on the agenda. Speaker cards may not be submitted relating to any items listed on the agenda.

Page 8 ends

STAFF COMMENTS

ADJOURNMENT
In memory of Don Edwards

FUTURE MEETINGS
The next regular meeting of the City Council will be held December 13, 2022, at 6:00 PM in the Council Chambers, 1st floor of City Hall, 23920 Valencia Blvd., Santa Clarita, CA.

CERTIFICATION
On November 17, 2022, I, Mary Cusick, do hereby certify that I am the duly appointed and qualified City Clerk for the City of Santa Clarita and that the foregoing agenda was posted at City Hall.

_____________________________
Mary Cusick
City Clerk
Santa Clarita, California

PROCLAMATION

Native American Heritage Month
November 2022

WHEREAS, November is nationally recognized as Native American Heritage Month which is a time to celebrate, foster, and promote the well-being of the Indigenous nations across the United States; and

WHEREAS, the City of Santa Clarita takes this time to recognize the hardships and triumphs of Native American people throughout Santa Clarita and United States history; and

WHEREAS, the Fernandeño Tataviam Band of Mission Indians descend from the lands now known as the City of Santa Clarita, as well as the San Fernando Valley, Antelope Valley, Simi Valley, and parts of the Angeles National Forest; and

WHEREAS, the Santa Clarita Public Library has partnered with the Fernandeño Tataviam Band of Mission Indians to provide educational opportunities for the public to learn more about the rich heritage of Native American communities; and

WHEREAS, in 2019 the Fernandeño Tataviam Band of Mission Indians partnered with the Santa Clarita Public Library on an initiative that allows the public to learn more about the heritage of Native American communities through the development of Yawáyro kits; and

WHEREAS, this year, the Santa Clarita Public Library has extended this collaboration to also include the Natural History Museum of Los Angeles to create new kits that feature additional books and items; and

WHEREAS, the Yawáyro: Indigenous Awareness & Literacy Development book kits are available at all Santa Clarita Public Libraries to provide the public with an interactive, enriching experience that honors Native American heritage for years to come.

NOW, THEREFORE, the City of Santa Clarita does hereby proclaim November as Native American Heritage Month and encourages residents to explore these opportunities to honor the Native American Heritage in our valley.

Signed this 22nd day of November, 2022.

Laurene Weste, Mayor
Santa Clarita, California

a
Packet Pg. 9
Attachment: Native American History Month Proclamation 2022 (Native American Heritage Month Proclamation)

PROCLAMATION

Small Business Saturday
November 26, 2022

WHEREAS, the City of Santa Clarita celebrates our local small businesses and the contributions they make to our local economy and community; and
WHEREAS, according to the United States Small Business Administration, there are currently

32.5 million small businesses in the United States, which represent 99.7 percent of all businesses with employees in the United States, and are responsible for 62 percent of net jobs created in the United States since 1995; and
WHEREAS, small businesses employ 46.8 percent of the employees in the private sector in the United States; and

WHEREAS, 94 percent of consumers in the United States value the contributions small businesses make in their community; and

WHEREAS, advocacy groups, as well as public and private organizations, across the country have endorsed the Saturday after Thanksgiving as Small Business Saturday; and

WHEREAS, 96 percent of consumers who plan to shop on Small Business Saturday said the day inspires them to go to small, independently-owned retailers or restaurants they have not been to before, or would not have otherwise tried; and

WHEREAS, the City of Santa Clarita supports our local businesses that create jobs, boost our local economy and preserve our communities.

NOW, THEREFORE, the City of Santa Clarita does hereby proclaim November 26, 2022, as Small Business Saturday and encourages all citizens to support small businesses and merchants on Small Business Saturday and throughout the year.

Signed this 22nd day of November, 2022.

Laurene Weste, Mayor
Santa Clarita, California

a
Packet Pg. 10
Attachment: Small Business Saturday 2022 (Small Business Saturday 2022 Proclamation)

CITY OF SANTA CLARITA
City Council
Special Meeting

~Minutes~

Tuesday, October 25, 2022 5:00 PM City Council Chambers

CALL TO ORDER
Mayor Weste called to order the Special Meeting at 5:00 p.m.

ROLL CALL
All Councilmembers were present.

PUBLIC PARTICIPATION FOR AGENDIZED ITEMS
No requests to speak were received.

CLOSED SESSION
Joseph Montes, City Attorney, advised of the need to conduct a Closed Session for the purpose of holding a:

CONFERENCE WITH LABOR NEGOTIATORS
Government Code Section 54957.6
Agency Negotiator: City Manager or designee
Unrepresented Employees: All positions not represented by SEIU Local 721

Government Code Section 54957.6
Agency Negotiator: City Manager or designee
Represented Employees: All positions represented by SEIU Local 721

CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Government Code Section 54956.9(d)(1)
Name of case: Michael Cruz et al. v. City of Santa Clarita LASC Case No. 21STCV47451

RECESS TO CLOSED SESSION - TO BE HELD IN THE CARL BOYER ROOM Mayor Weste recessed the meeting to Closed Session at 5:01 p.m.

RECONVENE TO OPEN SESSION
Mayor Weste reconvened the meeting to Open Session at 6:01 p.m.

1 Packet Pg. 11
Minutes Acceptance: Minutes of Oct 25, 2022 5:00 PM (Consent Calendar)

Page 2 ends

CITY ATTORNEY ANNOUNCEMENT
City Attorney Joseph Montes announced that no action was taken in Closed Session that was required to be reported.

ADJOURN
Mayor Weste adjourned the Special Meeting at 6:01 p.m.

______________________________________

MAYOR
ATTEST:

______________________________________

CITY CLERK
1 Packet Pg. 12
Minutes Acceptance: Minutes of Oct 25, 2022 5:00 PM (Consent Calendar)

CITY OF SANTA CLARITA
City Council
Regular Meeting

Joint Meeting with
Board of Library Trustees
Hereinafter the titles Mayor, Mayor Pro Tem, Councilmember, City Manager, City Attorney, and City Clerk may be used also to indicate Mayor/Chair/President, Mayor Pro Tem/Vice-Chair/Vice President, City Manager/Executive Director, City Attorney/Counsel, and City Clerk/Secretary ~Minutes~

Tuesday, October 25, 2022 6:00 PM City Council Chambers

INVOCATION
Mayor Pro Tem Gibbs delivered the invocation.

CALL TO ORDER
Mayor Weste called to order the Joint Regular meeting of the City Council and Board of Library Trustees at 6:05 p.m.

ROLL CALL
All Councilmembers were present.

FLAG SALUTE
Mayor Pro Tem Gibbs led the flag salute.

EXECUTIVE MEETING
This time has been set aside for Councilmembers to review the agenda and obtain any further information that may be needed. Council will also discuss each individual item during the course of the meeting with the exception of the Consent Calendar, which may be approved in its entirety by one motion, unless there is a request to pull an item for discussion. No action will be taken on public agenda items during the Executive Meeting.

APPROVAL OF AGENDA
Motion by Smyth, second by Gibbs, to approve the agenda, pulling items 6, 9, and 10 for public comment.

Hearing no objections, it was so ordered.

RESULT: APPROVED AGENDA

2 Packet Pg. 13
Minutes Acceptance: Minutes of Oct 25, 2022 6:00 PM (Consent Calendar)

Page 2 ends

AWARDS AND RECOGNITIONS
Mayor Weste spoke of Aiden Chapin, who helped Team USA to win three of four stages in the World Championship of Enduro Mountain Bike Racing in Finale Ligure, Italy, and Trek Bicycle, which is a strong presence in Santa Clarita for bike riders; and invited Aiden Chapin to the dais to receive a recognition certificate and to take a photo.

Councilmember Miranda discussed the impact of Filipino-Americans have made in the country and community, announced that the City proclaims the month of October 2022 as Filipino- American History Month in the City of Santa Clarita, and invited past Presidents of the Filipino- American Association of the Santa Clarita Valley to the dais to receive the proclamation.

PUBLIC PARTICIPATION
Addressing the Council were Melissa Diaz and Sandra Cattell, representing the Sierra Club, regarding the San Gabriel Mountains; Annette Lucas, representing the Calgrove Corridor group, regarding wildlife and the Santa Clara River; Deborah Korloff, representing the Calgrove Corridor group, regarding road widening; Joseph Jasik regarding the election; Jeffrey Malick regarding anti-semitic comments and the homeless; Alan Ferdman regarding the thin blue line flag; Robert McSweeney regarding Wiley Canyon; John Edwards regarding Wiley Canyon roundabouts; Joe Garcia regarding a parking enforcement issue; Cindy Josten regarding the upcoming election.

STAFF COMMENTS
City Manager Ken Striplin responded to Mr. Malick's comments regarding homelessness and stated that it is not the City's responsibility to find new locations for Bridge To Home, although it has helped facilitate their previous moves to new locations; commented that the Calgrove project Environmental Impact Report is being prepared, will be released to the public, and then be presented to the Planning Commission for hearings where members of the public will be able to give their feedback.

Council requested that Mr. Garcia receive help with his parking issue and for staff to gather more information about the closure of the Live Oak picnic area in the San Gabriel Mountains with regards to Ms. Diaz' request.

COMMITTEE REPORTS/COUNCILMEMBER COMMENTS
Councilmember Miranda reminded everyone about the Veterans Day Ceremony at Veterans Historical Park on Friday, November 11, at 11:00 a.m., and State of the City on Thursday, October 27, at 3:00 p.m.

Mayor Pro Tem Gibbs mentioned that Light up Main Street would be on Saturday, November 19, at 5:00 p.m., and announced that Saturday, December 3, is Santa Clarita Los Angeles Kings Day.

Councilmember McLean spoke about The Signal article regarding the high academic achievement of students in the William S. Hart Union High School District compared to others in 2 Packet Pg. 14
Minutes Acceptance: Minutes of Oct 25, 2022 6:00 PM (Consent Calendar)

Page 3 ends

the State of California amidst the COVID-19 pandemic, and spoke about October being Cyber security month.

Mayor Weste congratulated the Boys and Girls Club on the 30th anniversary of their Newhall Park clubhouse; congratulated Boy Scout Troop 2 on their 100th anniversary; congratulated the Sheriff's Station on their Haunted Jailhouse; mentioned that she attended the Chamber of Commerce's MB2 Mixer; mentioned the 150th anniversary of the Sulphur Springs School District; and requested to adjourn tonight's meeting in memory of Gregory Morris Augusta.

CONSENT CALENDAR
RESULT: APPROVED [UNANIMOUS]
MOVER: Bill Miranda, Councilmember
SECONDER: Marsha McLean, Councilmember
AYES: Weste, Gibbs, McLean, Miranda, Smyth

ITEM 1
APPROVAL OF SPECIAL MEETING MINUTES – The minutes are submitted for approval.

RECOMMENDED ACTION: City Council approve the minutes of the October 11, 2022, Special Meeting

ITEM 2
APPROVAL OF REGULAR MEETING MINUTES – The minutes are submitted for approval.

RECOMMENDED ACTION: City Council approve the minutes of the October 11, 2022, Regular Meeting

ITEM 3
CHECK REGISTER NO. 21
Check Register No. 21 for the Period 09/09/22 through 09/22/22 and 09/29/22. Electronic Funds Transfers for the Period 09/12/22 through 09/23/22.

RECOMMENDED ACTION:

City Council approve and ratify for payment the demands presented in Check Register No. 21.

ITEM 4

ON-CALL GENERAL CONTRACTOR SERVICES
On-Call general contracting service agreements for Citywide public works and unforeseen projects.

RECOMMENDED ACTION:

City Council:

1. Award one-year contracts to BR Builders, Inc., Foster Construction, and RC Becker and Son, Inc. for public works on-call contractor services in an amount not to exceed $200,000 per contract.

2. Authorize the City Manager or designee to award two additional, one-year agreements to each contractor in an amount not to exceed $200,000 for each renewal. 2 Packet Pg. 15
Minutes Acceptance: Minutes of Oct 25, 2022 6:00 PM (Consent Calendar)

Page 4 ends

3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.

ITEM 5

BUILDING PLAN REVIEW, BUILDING INSPECTION, AND PERMIT-RELATED

PROFESSIONAL SERVICES
Increase expenditure authority for contracts with previously selected, qualified vendors to provide as-needed building plan review, building inspection, and permit-related professional services to the City of Santa Clarita.

RECOMMENDED ACTION:

City Council:

1. Authorize an expenditure authority increase to the City's on-call Building & Safety consulting firms: JAS Pacific, Scott Fazekas & Associates, Interwest Consulting Group, and TRB and Associates, in the amount of $500,000, resulting in a total on-call expenditure authority amount of $1,000,000 for Fiscal Year 2022-23.

2. Authorize a one-time appropriation from the General Fund in the amount of $500,000 to Building & Safety Contractual Services expenditure account 1004100-516101.

3. Increase Building & Safety Plan Review revenue account 100-411107 (General Fund) by $1,000,000.

4. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.

ITEM 6

AGREEMENT BETWEEN THE CITY OF SANTA CLARITA AND THE COUNTY OF LOS

ANGELES FOR THE OPERATION OF TRANSIT SERVICES IN THE UNINCORPORATED SANTA CLARITA VALLEY FOR FISCAL YEAR 2022-23 THROUGH FISCAL YEAR 2025-26
Consideration of an agreement between the City of Santa Clarita and the County of Los Angeles for the City to provide public transportation services in the unincorporated areas of the Santa Clarita Valley.

RECOMMENDED ACTION:

City Council approve an agreement with the County of Los Angeles for the City of Santa Clarita to provide public transportation services in unincorporated areas, and authorize the City Manager or designee to execute the Agreement, or modify the award in the event that issues of impossibility of performance arise, subject to City Attorney approval.

Addressing the Council was Elaine Ballace.

2 Packet Pg. 16
Minutes Acceptance: Minutes of Oct 25, 2022 6:00 PM (Consent Calendar)

Page 5 ends

ITEM 7
PACIFIC CREST PARK PLAYGROUND SHADE PROJECT P4025
Pacific Crest Park was annexed into the City of Santa Clarita in 2012. Amenities currently available at the 6.8-acre neighborhood park include a large playground, restroom building, concrete walking paths, benches, and drinking fountains. This project will provide shade over the children's playground area.

RECOMMENDED ACTION:

City Council:

1. Approve the plans and specifications for the Pacific Crest Park Playground Shade Project P4025.

2. Approve the use of a “piggyback” contract to purchase and install shade structures from USA Shade – Play Power Inc. through the Sourcewell Cooperative Purchasing Contract #010521- LTS, in the amount of $242,012, plus a contingency amount of $24,201, for a total amount not to exceed $266,213.

3. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.

ITEM 8
PURCHASE OF TWO FORD F-350 SUPER DUTY TRUCKS WITH UTILITY BED This item is to approve the purchase of two Ford F-350 super duty trucks with utility beds for Parks Maintenance.

RECOMMENDED ACTION:

City Council:

1. Approve the purchase of two 2022 Ford F-350 super duty trucks from Auto Nation Ford Valencia for a total amount not to exceed $123,593.

2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.

ITEM 9

ESTABLISH A NO STOPPING ANY TIME ZONE ON THE NORTH SIDE AND SOUTH

SIDE OF MAGIC MOUNTAIN PARKWAY
City staff determined that establishing a No Stopping Any Time zone on the north side and south side of Magic Mountain Parkway, between Tourney Road and Fairways, will beautify this corridor by reducing the visual nuisance of big rig truck parking and abandoned vehicles, and will prepare Magic Mountain Parkway for future improvements.

RECOMMENDED ACTION:

City Council:

1. Adopt a resolution to establish a 2,650-foot No Stopping Anytime zone on the north side of Magic Mountain Parkway, and a 1,500-foot No Stopping Anytime zone on the south side of 2 Packet Pg. 17
Minutes Acceptance: Minutes of Oct 25, 2022 6:00 PM (Consent Calendar)

Page 6 ends

Magic Mountain Parkway, between Tourney Road and Fairways.

2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.

Addressing the Council were Elaine Ballace and Steve Petzold.

City Manager Ken Striplin stated he will have staff contact those who have questions about no- stopping zones.

Councilmember McLean inquired about where people will park their vehicles if there are no- parking zones. Mr. Striplin stated when the City establishes no-parking zones, it is to address quality of life issues within the community and to mitigate traffic hazards in those areas; and that the vehicles that currently park at this location are staying for several days at a time without moving.

Adopted Resolution No. 22-59

ITEM 10

ESTABLISH NO STOPPING ZONES ON SCHOOL DAYS ONLY ALONG THE NORTH

AND SOUTH SIDES OF ESPUELLA DRIVE
Establish a no stopping zone on the north side of Espuella Drive, starting at 150 feet and extending a distance of 295 feet west of Caballeta Drive and a no stopping zone on the south side of Espuella Drive, between Bouquet Canyon Road and Caballeta Drive, between 7:00 a.m. and 8:30 a.m. and between 1:00 p.m. and 3:30 p.m. on school days only.

RECOMMENDED ACTION:

City Council:

1. Adopt a resolution to establish a No Stopping zone between 7:00 a.m. and 8:30 a.m. and between 1:00 p.m. and 3:30 p.m. on school days only on the north side of Espuella Drive, starting at 150 feet and extending a distance of 295 feet west of Caballeta Drive and on the south side of Espuella Drive between Bouquet Canyon Road and Caballeta Drive.

2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.

Addressing the Council was Elaine Ballace.

Adopted Resolution No. 22-60.

PUBLIC PARTICIPATION II
Addressing the Council were Nancy (no last name given) regarding appreciation for Council; Elaine Ballace regarding College of the Canyons and the election; Steve Petzold regarding the thin blue line flag, the military, and disc golf.

2 Packet Pg. 18
Minutes Acceptance: Minutes of Oct 25, 2022 6:00 PM (Consent Calendar)

Page 7 ends

ADJOURNMENT
Mayor Weste adjourned the Regular Meeting in memory of Gregory Morris Augusta at 7:23 p.m.

______________________________________

MAYOR
ATTEST:

______________________________________

CITY CLERK
2 Packet Pg. 19
Minutes Acceptance: Minutes of Oct 25, 2022 6:00 PM (Consent Calendar)

CITY OF SANTA CLARITA
City Council
Special Meeting
~Minutes~
Thursday, October 27, 2022 3:00 PM Canyon Country Community Center

WELCOME
A welcome message was provided by City Manager Ken Striplin.

INVOCATION
Pastor David Hegg from Grace Baptist Church provided the invocation.

CALL TO ORDER
The meeting was called to order by Mayor Laurene Weste at 3:35 p.m.

ROLL CALL
All Councilmembers were present.

FLAG SALUTE
Golden Valley High School Air Force Junior ROTC posted the colors, Congressman Mike Garcia led the flag salute, and the Saugus High School Marching Centurions played the National Anthem.

STATE OF THE CITY
Mayor Laurene Weste welcomed dignitaries and the audience to the 2022 State of the City. Brief remarks were made and video presentations by each Councilmember were shown.

PUBLIC PARTICIPATION
Joshua Straschewski regarding homelessness; Missy (no last name given) regarding the State of the City; Jeffrey Malick regarding the homeless shelter; and Elaine Ballace.

ADJOURN
The meeting was adjourned at 4:38 p.m.
______________________________________
MAYOR
ATTEST:
______________________________________

CITY CLERK
3 Packet Pg. 20
Minutes Acceptance: Minutes of Oct 27, 2022 3:00 PM (Consent Calendar)

Page 1 ends

Agenda Item: 4

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: CHECK REGISTER NOS. 22 AND 23
DEPARTMENT: Administrative Services
PRESENTER: Brittany Houston

RECOMMENDED ACTION
City Council approve and ratify for payment the demands presented in Check Register Nos. 22 and 23.

BACKGROUND
Check Register No. 22 for the Period 09/23/22 through 10/06/22 and 10/13/22 in the aggregate amount of $5,564,376.52 inclusive of Electronic Funds Transfers for the Period 09/26/22 through 10/07/22 in the aggregate amount of $1,111,127.93.

Check Register No. 23 for the Period 10/07/22 through 10/20/22 and 10/27/22 in the aggregate amount of $14,026,594.19 inclusive of Electronic Funds Transfers for the Period 10/10/22 through 10/21/22 in the aggregate amount of $690,753.54.

FISCAL IMPACT
No Fiscal Impact.

ATTACHMENTS
Memo - Check Register No. 22
Memo - Check Register No. 23
Check Register No. 22 (available in the City Clerk's Reading File) Check Register No. 23 (available in the City Clerk's Reading File) 4 Packet Pg. 21

4.a
Packet Pg. 22
Attachment: Memo - Check Register No. 22 (Check Register Nos. 22 and 23)

4.a
Packet Pg. 23
Attachment: Memo - Check Register No. 22 (Check Register Nos. 22 and 23)

4.a
Packet Pg. 24
Attachment: Memo - Check Register No. 22 (Check Register Nos. 22 and 23)

4.b
Packet Pg. 25
Attachment: Memo - Check Register No. 23 (Check Register Nos. 22 and 23)

4.b
Packet Pg. 26
Attachment: Memo - Check Register No. 23 (Check Register Nos. 22 and 23)

4.b
Packet Pg. 27
Attachment: Memo - Check Register No. 23 (Check Register Nos. 22 and 23)

Page 1 ends

Agenda Item: 5

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: LOCAL APPOINTMENTS LIST/DECLARING VACANCIES
DEPARTMENT: Administrative Services
PRESENTER: Mary Cusick

RECOMMENDED ACTION
City Council:

1. Approve the Local Appointments List.

2. Declare vacancies on the Planning Commission; Parks, Recreation and Community Services Commission; Arts Commission; Open Space Preservation District Financial Accountability and Audit Panel; and Greater Los Angeles County Vector Control Board.

3. Approve a four-year term for the City’s appointment to the Greater Los Angeles County Vector Control Board; and

4. Approve the recruitment process for the vacancies.

BACKGROUND
Section 54970 et seq. of the Government Code, also known as “The Maddy Act,” takes into consideration a vast and largely untapped reservoir of talent which exists among the citizenry that frequently is not aware of the opportunities for participation on local regulatory and advisory boards and commissions. For that reason, the Maddy Act was enacted for maximum public awareness of appointments to be made by the Governor, the City Council, or other legislative bodies.

Government Code Section 54972 requires that, on or before December 31 of each year, the legislative body (City Council) must cause to be prepared a list of appointments of all ongoing boards, commissions, and committees which are appointed by the City Council. The list must include which terms will expire during the next calendar year, with the name of the incumbent appointee, the date of appointment, the date the term expires, and the necessary qualifications for 5 Packet Pg. 28

Page 2 ends

the position. Section 54973 requires that legislative bodies designate the public library with the largest service population within the jurisdiction to receive a copy of the list.

Terms of various Planning Commissioners, Parks, Recreation and Community Services Commissioners, Arts Commissioners, and Open Space Preservation District Financial Accountability and Audit Panel members will expire on December 31, 2022. The term of the Trustee of the Greater Los Angeles County Vector Control Board expires January 8, 2023. The various appointees, their appointment dates, the dates those appointments expire, and names of the Councilmembers who made the appointments are provided in the attached Local Appointments List.

Pursuant to applicable resolutions and/or ordinances, members of the Planning Commission, Parks, Recreation and Community Services Commission, Arts Commission, and Open Space Preservation District Financial Accountability and Audit Panel serve at the will of the Council for regular appointed terms of four years. The City’s appointment to the Greater Los Angeles County Vector Control Board is set forth by Health & Safety Code section 2000 et seq. and can serve a two or four-year term. Staff recommends, for consistency with the other appointments, that the City Council approve a four-year term.

Pursuant to procedures adopted by the City Council in Resolution 91-194, below is a recommended schedule for the appointment process:

November 22 Council declares vacancies
November 23 City Clerk posts and prepares for publication the Notice of Vacancies December 15 Deadline for City Clerk to receive applications January 10 Nominating authority submits nominations for ratification by the City Council

It is anticipated the City Clerk will administer the oath of office for the newly appointed members to the City’s commissions, panel, and board at or prior to their next regularly scheduled meetings following appointment.

ALTERNATIVE ACTION
Other action as determined by the City Council.

FISCAL IMPACT

Costs of publishing the Notice of Vacancies have been budgeted in Fiscal Year 2022-23.

ATTACHMENTS
Local Appointments List
Resolution 91-194
5 Packet Pg. 29

CITY OF SANTA CLARITA - LOCAL APPOINTMENTS LIST
COPIES MAY BE OBTAINED FROM THE CITY CLERK’S OFFICE
23920 VALENCIA BLVD., SANTA CLARITA, CA 661-255-4391
November 22, 2022

THIS NOTICE SHALL REMAIN POSTED UNTIL SUPERSEDED

PLANNING COMMISSION

Name Appointment Date Expiration Date Nominated By

Timothy Burkhart January 12, 2021 December 31, 2024 Jason Gibbs Renee Berlin January 12, 2021 December 31, 2024 Cameron Smyth Lisa Eichman January 08, 2019 December 31, 2022 Marsha McLean Dennis Ostrom January 08, 2019 December 31, 2022 Laurene Weste Dan Masnada January 08, 2019 December 31, 2022 Bill Miranda

Duties: The Planning Commission shall have the power and duty, except as otherwise provide d by law, to investigate and make recommendations to the City Council regarding review of proposals for major public works projects; review proposals for acquisition of property for street, park or other public purposes; make recommendations to the City Council with respect to a specific plan or regulation or amendment; hold public hearings on proposed zoning; hear and decide applications for conditional uses or other permits; hear and decide applications for exceptions or variances; consider tentative maps of proposed subdivision s; have and exercise all of the powers, duties, rights, privileges and authorities of a City Planning Commission, as provided for by the State of California.

Qualifications: Each of the five (5) Commissioners shall be a resident of the City and shall be appointed by and serve at the pleasure of the City Council.

PARKS, RECREATION AND COMMUNITY SERVICES COMMISSION

Name Appointment Date Expiration Date Nominated By

Jonathan Waymire January 12, 2021 December 31, 2024 Jason Gibbs Henry Rodriguez January 12, 2021 December 31, 2024 Cameron Smyth Dianna Boone January 08, 2019 December 31, 2022 Marsha McLean Rebecca Skye Ostrom January 12, 2021 December 31, 2022 Laurene Weste Donald Cruikshank August 24, 2021 December 31, 2022 Bill Miranda

Duties: The Parks, Recreation and Community Services Commission shall have the power and duty, except as otherwise provided by law, to advise the City Council in all matters pertainin g to parks, public recreation, and community services ; cooperate with other governmental agencies and civic groups in the advancement of sound park, recreation , and community se rvices planning and programming; and have and exercise all of the powers, dutie s, rights, privileges and authorities of a City Parks, Recreation and Community Services Commission, as provided for by the State of California.

Qualifications: Each of the five (5) Commissioners shall be a resident of the City and shall be appointed by and serve at the pleasure of the City Council.

5.a
Packet Pg. 30
Attachment: Local Appointments List (Local Appointments List/Declaring Vacancies)

CITY OF SANTA CLARITA - LOCAL APPOINTMENTS LIST
COPIES MAY BE OBTAINED FROM THE CITY CLERK’S OFFICE
23920 VALENCIA BLVD., SANTA CLARITA, CA 661-255-4391
November 22, 2022

THIS NOTICE SHALL REMAIN POSTED UNTIL SUPERSEDED

ARTS COMMISSION

Name Appointment Date Expiration Date Nominated By

April Scott-Goss January 12, 2021 December 31, 2024 Jason Gibbs Andrea Vibe January 25, 2022 December 31, 2024 Cameron Smyth Dr. Michael Millar January 08, 2019 December 31, 2022 Marsha McLean Patti Rasmussen January 08, 2019 December 31, 2022 Laurene Weste Susan Shapiro January 08, 2019 December 31, 2022 Bill Miranda

Duties: The Arts Commission shall have the power and duty, except as otherwise provided by law , to advise the City Council and the Director of Parks, Recreation and Community Services, or City Manager, in all matters pertaining to arts programming and public art ; cooperate with other governmental agencies and civic groups in the advancement of sound arts development and arts planning and programming ; and have and exercise all of the powers, duties, rights, privileges and authorities of a City Arts Commission, as provided for by the State of California.

Qualifications: Each of the five (5) Commissioners shall be a resident of the City and shall be appointed by and serve at the pleasure of the City Council.

OPEN SPACE PRESERVATION DISTRICT

FINANCIAL ACCOUNTABILITY AND AUDIT PANEL

Name Appointment Date Expiration Date Nominated By

Sunil Rajpal January 12, 2021 December 31, 2024 Jason Gibbs Kyle Jellings January 12, 2021 December 31, 2024 Cameron Smyth Sandra Cattell January 9, 2019 December 31, 2022 Marsha McLean Susan Orloff January 9, 2019 December 31, 2022 Laurene Weste Wendy Langhans January 9, 2019 December 31, 2022 Bill Miranda

Duties: The Financial Accountability and Audit Panel reviews and recommends approval of the annual work program to City Council to ensure land acquisition priorities are adhered to; reviews the accounting of the funds generated by the Open Space Preservation District; works in conjunction with the City’s independent auditor to ensure the Preservation District funds were spent properly and good fiscal management of the funds is occurring; makes determinations as to whether the expenditures are consistent with the criteria and the requirements established in the Engineer’s Report; and approves an annual written report for the public, summarizing these actions.

Qualifications: Each of the five (5) Panel Members shall be a resident of the City and shall be appointed by and serve at the pleasure of the City Council.

5.a
Packet Pg. 31
Attachment: Local Appointments List (Local Appointments List/Declaring Vacancies)

CITY OF SANTA CLARITA - LOCAL APPOINTMENTS LIST
COPIES MAY BE OBTAINED FROM THE CITY CLERK’S OFFICE
23920 VALENCIA BLVD., SANTA CLARITA, CA 661-255-4391
November 22, 2022

THIS NOTICE SHALL REMAIN POSTED UNTIL SUPERSEDED

BOARD OF LIBRARY TRUSTEES

Name Appointment Date Expiration Date Appointed By

Marsha McLean July 14, 2020 June 30, 2023 Laurene Weste Jason Gibbs May 25, 2021 June 30, 2024 Bill Miranda
Laurene Weste May 25, 2021 June 30, 2024 Bill Miranda
Cameron Smyth June 14, 2022 June 30, 2025 Laurene Weste Bill Miranda June 14, 2022 June 30, 2025 Laurene Weste

Duties: The Santa Clarita Public Library shall be governed and operated in accordance with the provisions of the Municipal Libraries Act (Education Code Section 18900 et seq.).

Qualifications: Each of the five (5) Trustees shall be appointed by the Mayor with t he consent of the City Council and hold office for three years.

GREATER LOS ANGELES COUNTY VECTOR CONTROL

BOARD OF TRUSTEES

Name Appointment Date Expiration Date Nominated By

Heidi Heinrich January 8, 2019 January 8, 2023 City Council

Duties: Board member duties and responsibilities include setting policy, establishing the budget, approving expenditures, and retaining legal counsel.

Qualifications: The appointee shall (1) be appointed by the City Council, (2) be a resident voter of the City of Santa Clarita, and (3) serve a full two- or four-year term. It is the intent of the Legislature that persons appointed to boards of trustees have experience, training, and education in fields that will assist in the governance of the districts. (Health & Safety Code 2000 et seq.)

5.a
Packet Pg. 32
Attachment: Local Appointments List (Local Appointments List/Declaring Vacancies)

CITY OF SANTA CLARITA - LOCAL APPOINTMENTS LIST
COPIES MAY BE OBTAINED FROM THE CITY CLERK’S OFFICE
23920 VALENCIA BLVD., SANTA CLARITA, CA 661-255-4391
November 22, 2022

THIS NOTICE SHALL REMAIN POSTED UNTIL SUPERSEDED

NORTH COUNTY TRANSPORTATION COALITION

Name Appointment Date Expiration Date Nominated By

Jason Gibbs January 26, 2021 Council Discretion City Council Marsha McLean November 13, 2018 Council Discretion City Council Mike Hennawy January 25, 2022 Council Discretion City Council Damon Letz January 25, 2022 Council Discretion City Council Adrian Aguilar November 13, 2018 Council Discretion City Council

Duties: The mission is to improve the movement of people and goods in the North Los Angeles County subregion through the development of policies and programs that address critical transportation issues, promote economic development, and maximize transportation opportunities for the subregion and its member jurisdictions.

Qualifications: The North County Transportation Coalition Joint Powers Authority (JPA) has 12 Governing Board members. Of these members, the Santa Clarita City Council appoints four representatives: one member of the City Council; one representative from a business community organization; one at-large representative; and one non-voting ex officio representative of Santa Clarita Transit. Additionally, one alternate representative of the Governing Board is designated.

Should any person serving on the Governing Board fail to maintain the status as required by Section 5 of the JPA, that person’s position shall be deemed vacated as of the date such person ceases to qualify.

5.a
Packet Pg. 33
Attachment: Local Appointments List (Local Appointments List/Declaring Vacancies)

5.b
Packet Pg. 34
Attachment: Resolution 91-194 (Local Appointments List/Declaring Vacancies)

5.b
Packet Pg. 35
Attachment: Resolution 91-194 (Local Appointments List/Declaring Vacancies)

Page 1 ends

Agenda Item: 6

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: AUTHORITY TO EXECUTE AN AGREEMENT WITH THE

COUNTY OF LOS ANGELES FOR THE CITY OF SANTA
CLARITA'S FISCAL YEAR 2022-23 MEASURE H ALLOCATION
DEPARTMENT: Community Development
PRESENTER: Michael Villegas

RECOMMENDED ACTION
City Council:

1. Approve a one-year contract with Los Angeles County to receive Measure H funding in the amount of $193,443 to assist with the construction of Family Promise of Santa Clarita Valley’s interim housing facility and for a Homeless Services Coordinator to implement the 2022 Community Plan to Address Homelessness.

2. Increase revenue account 272-462101 by $193,443, and appropriate $18,314 to expenditure account 2723205-500201 and $175,129 to expenditure account 2723205-516101.

3. Authorize the City Manager to execute an agreement with Family Promise of Santa Clarita Valley in an amount not to exceed $175,129 to provide funding towards the construction of an interim housing facility in the Newhall community.

4. Authorize the City Manager or designee to execute all contracts and associated documents, and make non-material amendments that may arise, subject to City Attorney approval.

BACKGROUND
In March 2017, Los Angeles County (County) voters approved Measure H, a quarter-cent sales tax dedicated to preventing and addressing homelessness countywide. The measure was projected to raise $355 million annually for 10 years, with a sunset date of 2027.

In 2018, the City of Santa Clarita (City) was awarded a $50,000 grant in Measure H funds to develop a comprehensive plan to combat and address homelessness in Santa Clarita. Subsequent 6 Packet Pg. 36

Page 2 ends

to this, in 2019, the City entered into an agreement with the County to receive Measure H funding in the amount of $548,493. With this funding, the City provided Family Promise of Santa Clarita Valley (Family Promise) $300,015 for pre-construction related costs associated with the development of an interim housing facility in the Newhall Community. In addition, the City completed a Notice of Funding Availability process in late 2020, providing $126,493 in innovation grants to six local-serving non-profit organizations. This funding helped facilitate a shared housing program and student-housing feasibility study, among others, all aimed at addressing homelessness and housing insecurity in our community. The remaining funds were used to fund a Homeless Services Coordinator, who was instrumental in implementing the actions items identified in the Community Action Plan to Combat Homelessness, which was developed using the original $50,000 grant.

In late 2021, the County contacted City staff to inform them that the estimated allocation for Fiscal Year 2022-23 for Santa Clarita would be approximately $193,000. In discussions with the County on potential uses for this funding, it was decided that greatest community need and the best course of action was to recommend that $175,129 of the funding be provided to Family Promise to continue its efforts to construct a new interim housing facility. This funding coupled with the $300,015 from the City’s previous contract and the City-donated parcel, should put Family Promise well on its way to accomplishing its goal. The approximately $18,000 in remaining funds, are being proposed to be used for a Homeless Services Coordinator to help facilitate the implementation of the 2022 Community Action Plan to Combat Homelessness, which was adopted by the Community Task Force on Homelessness (Task Force) in July 2022 and will guide the Task Force’s efforts over the next 24-months.

ALTERNATIVE ACTION

Other action as determined by the City Council.

FISCAL IMPACT

Upon approval of the recommended actions, adequate budget will be available to fund a part- time Homeless Services Coordinator and provide financial assistance to Family Promise of Santa Clarita Valley for the construction of its approved interim housing facility. These activities will be offset by Measure H dollars and will have no impact on the General Fund.

ATTACHMENTS
Proposed Fiscal Year 2022-23 Measure H Contract (available in the City Clerk's Reading File) 6 Packet Pg. 37

Page 1 ends

Agenda Item: 7

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: APPROVAL OF A RESIDENTIAL CONTINUATION RIGHTS SOLID

WASTE SERVICE AGREEMENT FOR THE PROPOSED

ANNEXATION AREA OF TESORO DEL VALLE
DEPARTMENT: Neighborhood Services
PRESENTER: Darin Seegmiller

RECOMMENDED ACTION
City Council adopt a resolution approving an agreement for the continuation rights for residential solid waste collection for the Tesoro Del Valle annexed area of Santa Clarita; and approve and authorize the City Manager or designee to execute a continuation rights residential solid waste agreement with Burrtec Waste Industries, Inc., for the proposed annexation area of Tesoro Del Valle, subject to City Attorney approval.

BACKGROUND
The California Public Resources Code (PRC) governs the continuation of solid waste services after an annexation and grants the preexisting service provider the option to continue servicing the given area. This applies to the City of Santa Clarita’s (City) proposed annexation of Tesoro Del Valle, anticipated to be recorded in November 2022. Burrtec Waste Industries, Inc. (Burrtec), provides residential trash hauling service to the area, pursuant to their Exclusive Residential Franchise Agreement with Los Angeles County (County), which expires on October 31, 2025.

Burrtec has a right, pursuant to PRC Section 49520, to continue providing residential service to the Tesoro Del Valle area for the remainder of the term of the Exclusive Residential Franchise Agreement with the County or the duration of five years, whichever is less. In the attached letter, dated August 30, 2022, Burrtec indicated that it will exercise this right.

If approved, the proposed Residential Continuation Rights Agreement for the Tesoro Del Valle area will commence December 1, 2022, and remain in effect until October 31, 2025. After that time, the City’s future exclusive residential provider, Burrtec, will assume responsibility of services under the recently adopted Santa Clarita Franchise Agreement, which will take effect on 7 Packet Pg. 38

Page 2 ends

July 1, 2023. Other important conditions of the proposed Residential Continuation Rights Agreement include the following:

• A requirement that Burrtec provide a transition plan six months prior to the termination of the Continuation Rights Agreement, detailing how residents will be notified of the change of services in accordance to the newly adopted Santa Clarita Franchise Agreement with Burrtec; and

• Permission for Burrtec to commingle residential routes in the newly annexed area with the adjacent unincorporated areas until the newly adopted Santa Clarita Franchise Agreement takes effect. Burrtec will be required to use standard industry practices to accurately allocate disposal tonnages to each jurisdiction. This is necessary to ensure the City is only credited for residential waste generated within its boundaries.

The recommended action is exempt from California Environmental Quality Act (CEQA) in that adoption of the existing franchise agreement, within the newly annexed areas, will not result in any change to the environment, in accordance with Section 15061(b)(3). Therefore, no further consideration under CEQA is required.

ALTERNATIVE ACTION

Other action as determined by the City Council.

FISCAL IMPACT

The City will receive additional Solid Waste Franchise revenues of approximately $42,000 annually as a result of the annexation of the Tesoro Del Valle area.

ATTACHMENTS
Resolution
Burrtec Continuation Rights Request Letter
Continuation Rights Agreement (available in the City Clerk's Reading File) 7 Packet Pg. 39

Page 1 of 2 ends

RESOLUTION NO. 22- _______

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,

CALIFORNIA, APPROVING AN AGREEMENT FOR THE CONTINUATION RIGHTS FOR

RESIDENTIAL SOLID WASTE COLLECTION FOR THE TESORO DEL VALLE

ANNEXED AREA OF SANTA CLARITA, BETWEEN THE CITY OF SANTA CLARITA AND BURRTEC WASTE INDUSTRIES, INC.

WHEREAS, the City of Santa Clarita (City) is empowered under Section 7 of Article 11 of the California Constitution to make and enforce, within its limits, all police and sanitary ordinances and regulations not in conflict with general laws; and

WHEREAS, in partial implementation of Section 7 of Article 11 of the California Constitution, California Public Resources Code Section 40059 authorizes the City to determine all aspects of handling of solid waste that are of local concern, including the frequency of collection, means of collection and transportation, level of services and nature, location, and extent of waste handling services; and

WHEREAS, on November 12, 2019, the City adopted a resolution approving Master Case No. 19-115, adopting a Negative Declaration and authorizing the City Manager, or designee, to submit an application to the Local Agency Formation Commission requesting annexation of approximately 1,786 acres of land to the City of Santa Clarita for the Tesoro Del Valle Annexation Area; and

WHEREAS, on August 23, 2022, the City adopted a supplemental joint resolution and associated transfer agreements between the City and the County of Los Angeles (County) for the proposed Tesoro Del Valle annexation area; and

WHEREAS, it is anticipated that the recordation of the Tesoro Del Valle annexation will be completed by the end of November 2022, the area is as shown in Exhibit A; and

WHEREAS, Burrtec Waste Industries, Inc. (Burrtec) was awarded an Exclusive Franchise Contract (Contract) from the County of Los Angeles on October 16, 2018, with amendments on August 25, 2020, December 29, 2020, June 15, 2021, and July 21, 2022, (Amendments) to provide solid waste services to residential premises located within the proposed Tesoro Del Valle Annexation Area; and

WHEREAS, Burrtec has asserted continuation rights under Section 49250 et seq., of the California Public Resources Code to continue to provide residential waste services as prescribed in the October 16, 2018, County Franchise Agreement, and subsequent Amendments, which are substantially similar to the City residential waste services in the Annexed Area until October 31, 2025.

NOW, THEREFORE, the City Council of the City of Santa Clarita, California, does hereby resolve as follows:

7.a
Packet Pg. 40
Attachment: Resolution (APPROVAL OF A RESIDENTIAL CONTINUATION RIGHTS AGREEMENT IN THE ANNEXATION AREA OF TESORO DEL

Page 2 of 2 ends

SECTION 1. The “AGREEMENT FOR THE CONTINUATION RIGHTS FOR

RESIDENTIAL SOLID WASTE COLLECTION FOR THE TESORO DEL VALLE ANNEXED AREA OF SANTA CLARITA” is hereby approved. The City Manager is hereby authorized to execute the Agreement on behalf of the City, subject to City Attorney approval.

SECTION 2. Burrtec will be allowed to commingle residential routes in the newly annexed area with the adjacent unincorporated areas until the newly adopted Santa Clarita Franchise Agreement takes effect. Burrtec will be required to use standard industry practices to accurately allocate disposal tonnages to each jurisdiction.

SECTION 3. The City Clerk shall certify to the adoption of this resolution.

PASSED, APPROVED, AND ADOPTED this 22nd day of November 2022.

______________________________
MAYOR
ATTEST:

_______________________________

CITY CLERK

DATE:__________________________

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.

CITY OF SANTA CLARITA )

I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution No. 22- _________was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the 22nd day of November, 2022, by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:
______________________________

CITY CLERK

7.a
Packet Pg. 41
Attachment: Resolution (APPROVAL OF A RESIDENTIAL CONTINUATION RIGHTS AGREEMENT IN THE ANNEXATION AREA OF TESORO DEL

EXHIBIT A

7.a
Packet Pg. 42
Attachment: Resolution (APPROVAL OF A RESIDENTIAL CONTINUATION RIGHTS AGREEMENT IN THE ANNEXATION AREA OF TESORO DEL

26000 Springbrook Avenue, Unit 101, Saugus CA 91350
August 30, 2022 Mr. Darin Seegmiller City of Santa Clarita 23920 Valencia Blvd Santa Clarita, CA 91355 RE: Pending City of Santa Clarita Annexations of Tesoro Ranch Area Dear Mr. Seegmiller: Burrtec will exercise its continuation rights, in accordance with Public Resources Code Section 49520- 49521, with the residential serviced customers that are to be annexed by the City of Santa Clarita. These services are currently under contract with the County of Los Angeles through October 31, 2025. In our ongoing partnership with the City, Burrtec requests to have the County contract amended by resolution to suit both the City and Burrtec and have it administered by the City for the continuation period in the annexation area. The appropriate franchise fees will be remitted to the City, as will the pertinent service and solid waste generation and diversion tonnage reports. It is our intent, as in the other annexed areas, to continue providing quality service while providing the benefits under the City's residential program. Please contact me if you have any questions regarding the annexation plan or the transition plan timeline as previously submitted. Thank you, Dennis Verner General Manager, Santa Clarita Cc: Laura Jardine, City of Santa Clarita Curtis Williams, City of Santa Clarita Steve Milewski, Los Angeles County

7.b
Packet Pg. 43
Attachment: Burrtec Continuation Rights Request Letter (APPROVAL OF A RESIDENTIAL CONTINUATION RIGHTS AGREEMENT IN THE

Page 1 ends

Agenda Item: 8

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: AMEND CONTRACT FOR INVASIVE PLANT REMOVAL
DEPARTMENT: Neighborhood Services
PRESENTER: Darin Seegmiller

RECOMMENDED ACTION
City Council:

1. Amend the existing contract with Wildscape Restoration, Inc., to increase the scope of work for invasive plant removal and authorize an expenditure authority increase in the amount of $50,000, for a total contract amount not to exceed $99,760.

2. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.

BACKGROUND
The City of Santa Clarita (City) owns 297 acres of property in and around the Santa Clara River between South Fork and San Francisquito Creek, as shown in attached Exhibit A and B. In 2005, the City started a multi-year effort to abate invasive plants from the property. The invasive plants identified on the site include arundo, tamarisk, castor bean, and tree tobacco.

Arundo is a fast-growing, perennial bamboo that can reach 30 feet in height and consumes three to four times the amount of water of native plants. Additionally, arundo provides a desirable location for encampments within the river bed. Recent fires in the river bed have shown arundo catching fire from these encampments. Arundo survives drought and flooding, is flammable in nature, and grows back quickly after a disaster. Removal of arundo supports the Santa Clarita 2025 theme of Sustaining Public Infrastructure.

During the Fiscal Year (FY) 2021-22 budget process, the City Council authorized a Capital Improvement Project for arundo removal, and appropriated $50,000 for that effort. After adoption of the FY 2021-22 budget, the City conducted a Request for Proposal (RFP) process to solicit proposals from qualified companies who acquire permits and permissions, conduct 8 Packet Pg. 44

Page 2 ends

monitoring, remove arundo and tamarisk, and provide follow up reporting. To improve maintenance standards and enforce contractor accountability, this procurement utilized weighted criteria to evaluate and score proposals. The following categories comprised the weighted criteria used to evaluate the proposal:

• Contractor qualifications (30%)
• Thoroughness of scope of work (30%)
• References (20%)
• Cost of services provided (20%)

The RFP was sent to three qualified vendors on November 2, 2021. Only one proposal was received, from Wildscape Restoration, Inc. (Wildscape). A panel of three City staff members evaluated and scored the proposal based on the selection criteria above. The proposal was given a score of 84.6 points, and a contract was awarded to Wildscape in the amount of $49,760. As a result of unanticipated delays in obtaining permits required for the contractor to work in the river bed, the FY 2021-22 project has not been completed.

During the FY 2022-23 budget process, the City Council authorized another Capital Improvement Project for arundo removal, and appropriated an additional $50,000 for that effort.

Due to the lack of other bidders and the City’s satisfaction with the work of Wildscape, staff recommends increasing the scope of work and amending the current contract with Wildscape for the additional authorized Capital Improvement Project funds, for a total contract amount not to exceed $99,760.

ALTERNATIVE ACTION

Other action as determined by the City Council.

FISCAL IMPACT

Adequate funds in the amount of $99,760 are available in Capital Improvement Project expenditure accounts R0027356 and R1007356 (Stormwater Fund).

ATTACHMENTS
Exhibit A - Project Area
Exhibit B - Work Areas
Wildscape First Amendment (available in the City Clerk's Reading File) 8 Packet Pg. 45
B
C
E
AF
H G
D
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
¯
Project Area
City of Santa Clarita Site Specific Implementation Plan Upper Santa Clara River Arundo/Tamarisk Removal Program Santa Clarita, California
0 0.25 0.5 Miles
Work Areas
A
B
C
D
E
F
G
H
Prepared December 2020
Exhibit A

8.a
Packet Pg. 46
Attachment: Exhibit A - Project Area (AMEND CONTRACT FOR INVASIVE PLANT REMOVAL) ") !(
!(
E
G
H
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
¯
Treatement Area, Access Points, Staging Areas and Equipment Paths City of Santa Clarita Site Specific Implementation Plan Upper Santa Clara River Arundo/Tamarisk Removal Program Santa Clarita, California
0 200 400 Feet
Work Areas
E
!( Access Points
") Staging Areas
Path for Equipment
Focus Area
Prepared September 2022
Exhibit B

8.b
Packet Pg. 47
Attachment: Exhibit B - Work Areas (AMEND CONTRACT FOR INVASIVE PLANT REMOVAL)

Page 1 ends

Agenda Item: 9

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: SANTA CLARITA SPORTS COMPLEX BUILDOUT, PROJECT F3024 - AWARD DESIGN CONTRACT
DEPARTMENT: Public Works
PRESENTER: Shannon Pickett

RECOMMENDED ACTION
City Council:

1. Award a design contract to Kimley-Horn and Associates, Inc., for the Santa Clarita Sports Complex Buildout, Project F3024, in the amount of $3,049,816 and authorize a contingency in the amount of $304,982, for a total contract amount not to exceed $3,354,798.

2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.

BACKGROUND
The design for the Santa Clarita Sports Complex (SCSC) Buildout will primarily focus on the undeveloped 38-acre area in the southeastern portion of the SCSC. It will feature the addition of three full-size multipurpose fields and one multipurpose field for twelve and under youth sports.

This project will also incorporate a 400-meter running track with terraced seating around a portion of the track, a destination inclusive playground, a bike park with multiple tracks including a USA BMX sanctioned track, a self-contained dog park with shade canopies and fencing, open space trails, sand volleyball courts, picnic shelters, a restroom building, site and field lighting, and additional parking. This project supports the Building and Creating Community theme of the City of Santa Clarita’s (City) five-year strategic plan, Santa Clarita 2025.

The master planning process for the SCSC began in October 1998 and included two public workshops. The initial SCSC Master Plan was supported by City Council on May 4, 1999. In December 2002, City Council authorized staff to begin the process of revising the Master Plan for the SCSC to include the addition of an adjacent 38-acre parcel. The public participation 9 Packet Pg. 48

Page 2 ends

process included two public outreach meetings. The first meeting offered a community site awareness tour and planning workshop, and the second meeting presented the revised Master Plan for public review. A total of 76 people attended these two meetings and represented a good cross-section of organized sports and general recreation users. Staff also received several comment letters from those unable to attend the meetings, and these comments received consideration as part of the planning process. This process provided for the necessary site evaluations, and the folding together of community input, consistent with the City’s park development standards. The City Council approved the expansion of the SCSC Master Plan on February 24, 2004.

Staff updated the SCSC Master Plan in January 2022 based on findings outlined in the Parks and Recreation 5-Year Plan and as a result of two separate community surveys which were conducted by City staff, a series of focus group meetings with community stakeholders, and a scientific community survey conducted by an outside consultant.

The scope of work for this design contract includes architectural, engineering, and landscape design services required to prepare construction documents. These documents will consist of complete plans, specifications, and engineer’s estimates for construction. Bid assistance will also be provided to support the proposed site improvements.

A Request for Proposal (RFP) for the design of the project was prepared and posted on BidNet on July 6, 2022. The RFP asked firms to identify their relevant experience with similar projects and demonstrate their design approach for this project. On August 24, 2022, five firms submitted proposals. Staff reviewed the proposals, and based on their initial evaluations, the top three firms were invited to interview. Staff scored the firms on a 100-point scale and the following final ratings incorporated interview evaluations for the top three firms:

Rank Company Location Score

1. Kimley-Horn and Associates, Inc. Los Angeles, CA 94

2. Verde Design, Inc. Riverside, CA 92

3. BrightView Design Group Irvine, CA 88

4. RJM Design Group, Inc. San Juan Capistrano, CA 83

5. Anil Verma & Associates, Inc. Los Angeles, CA 81

The scoring system was based on the following criteria: responsiveness to the RFP, qualifications and design experience, proposed methodology, ability to meet the scope of work, project approach, and references. Additionally, the consulting firms were asked to provide a detailed schedule and scope of work required for them to prepare the plans, specifications, and an engineer’s estimate.

Kimley Horn and Associates, Inc., demonstrated an in-depth understanding of the project needs and provided a detailed scope of work and approach to the project. They analyzed the project location and identified key design factors that will need to be addressed in the design.

Based on their design experience with similar projects and the completeness of their proposal for this project, staff recommends awarding the design contract to Kimley Horn and Associates, Inc.

9 Packet Pg. 49

Page 3 ends

The requested contingency will cover the costs of unforeseen design constraints and account for potential design modifications requested by the City and other permitting agencies during the design of the project. This includes potential adjustments to the architectural drawings, engineered grades, change order requests made by the design firm, and change orders for additional work requested by the City.

California Government Code 4526 prescribes selection of architectural and engineering services to be based on demonstrated competence and professional qualifications necessary for the satisfactory performance of the services required and does not authorize the selection of professional architect and engineering services based on cost. City staff was able to reach an agreement with Kimley-Horn and Associates, Inc., at a fair and reasonable price.

ALTERNATIVE ACTION

Other action as determined by the City Council.

FISCAL IMPACT

Adequate funds are available in expenditure account F3024723-516101 (Facilities Fund) to support the recommended contract and project administrative costs.

ATTACHMENTS
Location Map
Proposal for Kimley Horn and Associates, Inc. (available in the City Clerk's Reading File) 9 Packet Pg. 50

9.a
Packet Pg. 51
Attachment: Location Map (SANTA CLARITA SPORTS COMPLEX BUILDOUT - AWARD DESIGN

Page 1 ends

Agenda Item: 10

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: SUMMARY VACATION OF EASEMENTS FOR SLOPE AND

STREET PURPOSES LOCATED ON THE WEST SIDE OF SIERRA

HIGHWAY, SOUTH OF NEWHALL AVENUE (SIERRA WEST

ASSISTED LIVING )
DEPARTMENT: Public Works
PRESENTER: Amalia Marreh

RECOMMENDED ACTION
City Council:

1. Adopt a resolution for the summary vacation of an easement for slope purposes as described and shown on Exhibit “A” Legal Description and Exhibit “B” Exhibit Map of the attached resolution, and an easement for street purposes as described and shown on Exhibit “C” Legal Description and Exhibit “D” Exhibit Map of the attached resolution.

2. Direct City Clerk to record the certified original resolution in the County of Los Angeles Registrar-Recorder’s office.

BACKGROUND
The slope easement to be vacated is a portion of Lot 10 of Tract Map No. 2703 which was recorded on February 26, 1915. The slope easement was dedicated to the State of California (State) for public highway slope purposes per Final Order of Condemnation by the State of California recorded May 28, 1969, as Instrument No. 3655.

The street easement to be vacated is also a portion of Lot 10 of Tract Map No. 2703. The street easement was dedicated to the State of California for State highway purposes per Final Order of Condemnation by the State of California recorded May 28, 1969, as Instrument No. 3655, both easements are shown on the attached location map.

The slope and street easements were acquired by the City of Santa Clarita (City) through State Highway Relinquishment No. 1244 dated June 21, 2013, and recorded as document No. 20130929825.
10 Packet Pg. 52

Page 2 ends

On March 23, 2021, the City Council adopted Resolution No. 21-10 approving Master Case 18- 235. This approval allowed for the construction of an 83-unit, 61,736-square-foot senior living facility, which would consist of independent, assisted living, and memory care units. The facility is located on the west side of Sierra Highway, approximately 600 feet south of Newhall Avenue.

A portion of the slope easement and a portion of the street easement will no longer be necessary, due to the proposed development of the assisted living facility and the modification to the site layout per the approved project site plans. Staff is recommending the unnecessary easements to be vacated.

In addition, by separate instrument, the property owner has dedicated an additional eight feet of right of way for public use and trail purposes along the property frontage on Sierra Highway for the total right of way width of Sierra Highway of 58 feet from centerline.

In compliance with sections 8340 of the Streets and Highway Code and section, City staff coordinated with public utilities to ensure easements for public utilities in place will be reserved.

Per Section 8331 of the Street and Highway Code, the legislative body of a local agency may summarily vacate a street or highway if both of the following conditions exist:
(a) For a period of five consecutive years, the street or highway has been impassable of vehicular travel; and
(b) No public money was expended for maintenance on the street or highway during each period.

Both of these conditions exist; therefore, staff is recommending a portion of the street easement and a portion of the slope easement as described and shown on Exhibits “A” through “D” of the attached resolution to be summarily vacated by adopting the resolution.

ALTERNATIVE ACTION
Other actions as determined by the City Council.

FISCAL IMPACT

There is no fiscal impact associated with this action.

ATTACHMENTS
Resolution and Exhibits
Location Map
10 Packet Pg. 53

Page 1 of 3 ends

RESOLUTION NO. 22- _______

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,

CALIFORNIA, SUMMARILY VACATING A PORTION OF EASEMENTS DEDICATED

TO THE CITY OF SANTA CLARITA FOR SLOPE AND STREET PURPOSES LOCATED AT THE WESTSIDE OF SIERRA HIGHWAY, APPROXIMATELY 600 FEET SOUTH OF

NEWHALL AVENUE (SIERRA WEST ASSISTED LIVING), CREATED BY INSTRUMENT NO. 3655 TO THE STATE OF CALIFORNIA ON MAY 28, 1969, AND

ACQUIRED BY THE CITY OF SANTA CLARITA THROUGH STATE HIGHWAY RELINQUISHMENT NO. 1244 DATED JUNE 21, 2013

WHEREAS, the slope easement and street easement being summarily vacated fully meet the requirements of Section 8331 of the Streets and Highways Code, which states “The legislative body of a local agency may summarily vacate a street or highway if both of the following conditions exist: (a) For a period of five consecutive years, the street or highway has been impassable for vehicular travel. (b) No public money was expended for maintenance on the street or highway during such period”; and

WHEREAS, under Chapter 4, Summary Vacation of Part 3 of Division 9 of the California Streets and Highways Code, no public hearing is required and no public hearing was held.

NOW, THEREFORE, pursuant to the provisions of Sections 8331of Part 3 of Division 9 of the California Streets and Highways Code, the City Council of the City of Santa Clarita, California, does hereby resolve as follows:

SECTION 1. That it is hereby found and determined that a portion of an easement for slope purposes, along Sierra Highway, as described in Exhibit “A” a legal description, and as shown on Exhibit “B” Map, and a portion of an easement for street purposes, as described in Exhibit “C” legal description, and as shown on Exhibit “D” exhibit map, attached hereto and incorporated herein by this reference, which real property located in the City of Santa Clarita, County of Los Angeles, State of California, fully meets the requirements of Section 8331 of the Streets and Highways Code, which states “The legislative body of a local agency may summarily vacate a street or highway if both of the following conditions exist: (a) For a period of five consecutive years, the street or highway has been impassable for vehicular travel. (b) No public money was expended for maintenance on the street or highway during such period.” and such easements are therefore vacated.

SECTION 2. That within the street easement to be vacated, there are public utility facilities that would be affected by the vacation, therefore, easements are hereby reserved and excepted from the vacation for public utility purposes as described below:

The City of Santa Clarita, a Municipal Corporation does hereby RESERVE a non- exclusive easement for Pacific Bell Telephone Company, doing business as AT&T California, to from time to time construct, maintain, operate, replace, remove, and renew such aerial and

10.a
Packet Pg. 54
Attachment: Resolution and Exhibits (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON SIERRA HWY SOUTH OF

Page 2 of 3 ends

underground communication facilities (including ingress and egress therefrom) consisting of poles, anchors, guys, cables, wires, crossarms, conduits, manholes, handholes, markers, pedestals, terminal equipment cabinets, electrical conductors and necessary fixtures and appurtenances upon, over, and across the real property described in Exhibit “C” and shown in Exhibit “D,” both which are attached hereto and incorporated hereinabove.

In addition, the City of Santa Clarita, a Municipal Corporation does hereby RESERVE non-exclusive easement for Southern California Gas Company to excavate for, lay, construct, reconstruct, relocate, reconfigure, use, inspect, maintain, operate, repair, replace, patrol, change the size of, add to, or remove from time to time, as Southern California Gas Company deems necessary, one or more pipelines and conduits, together with devices for metering, measuring, regulating, cathodic protection, communications, and other appurtenances in, upon, over, and across the real property described in Exhibit “C” and shown in Exhibit “D,” both which are attached hereto and incorporated hereinabove.

SECTION 3. That the City Clerk of the City of Santa Clarita is instructed to record the certified original resolution in the office of the Registrar-Recorder of the County of Los Angeles, at which time the easements summarily vacated will no longer be public service easements.

SECTION 4. The City Clerk shall certify to the adoption of this resolution.

PASSED, APPROVED, AND ADOPTED this 22
nd day of November 2022.

______________________________
MAYOR

ATTEST:

_______________________________

CITY CLERK

DATE:__________________________

10.a
Packet Pg. 55
Attachment: Resolution and Exhibits (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON SIERRA HWY SOUTH OF

Page 3 of 3 ends

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.

CITY OF SANTA CLARITA )

I, Mary Cusick, City Clerk of the City of Santa Clarita, California, do hereby certify that the foregoing Resolution No. 22-__ was duly adopted by the City Council of the City of Santa Clarita, California at a regular meeting thereof, held on the 22nd day of November 2022, by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

______________________________

CITY CLERK

10.a
Packet Pg. 56
Attachment: Resolution and Exhibits (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON SIERRA HWY SOUTH OF

10.a
Packet Pg. 57
Attachment: Resolution and Exhibits (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON SIERRA HWY SOUTH OF

10.a
Packet Pg. 58
Attachment: Resolution and Exhibits (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON SIERRA HWY SOUTH OF

10.a
Packet Pg. 59
Attachment: Resolution and Exhibits (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON SIERRA HWY SOUTH OF

10.a
Packet Pg. 60
Attachment: Resolution and Exhibits (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON SIERRA HWY SOUTH OF

10.a
Packet Pg. 61
Attachment: Resolution and Exhibits (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON SIERRA HWY SOUTH OF

10.b
Packet Pg. 62
Attachment: Location Map (SUMMARY VACATION OF EASEMENTS FOR SLOPE/STREET PURPOSES ON

Page 1 ends

Agenda Item: 11

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: PROCUREMENT OF ICE COVERINGS FOR EVENTS HOSTED AT THE CUBE – ICE AND ENTERTAINMENT CENTER
DEPARTMENT: Economic Development
PRESENTER: Evan Thomason

RECOMMENDED ACTION
City Council:

1. Approve the “piggyback” purchase and installation of portable ice coverings using Sourcewell contract #120320-ATH-1 with Becker Arena Products, Inc., in the amount of $207,314, and authorize a contingency of $20,732, for a total contract amount not to exceed $228,046.

2. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.

BACKGROUND
On August 25, 2020, the Santa Clarita City Council approved the purchase of the Valencia Ice Station, which was later re-branded as The Cube – Ice and Entertainment Center (The Cube).

When contemplating the purchase of the facility, the City of Santa Clarita (City) looked at potential property uses and re-visited studies conducted in 2010 and 2013 regarding the potential market demand for a local conference center. The results of these studies concluded that there is a need for large business and event spaces in the community.

Currently, the largest square-footage venue for meeting/event space in the Santa Clarita Valley is at the Hyatt Regency Valencia, with approximately 6,000 square feet. The National Hockey League-sized arena at The Cube is 17,000 square-feet, with adjacent bleachers that can accommodate well-over 200 spectators.

Identified as a goal within Santa Clarita 2025, procurement of the recommended ice coverings will enhance the City’s efforts to promote economic vitality and provide additional facility space 11 Packet Pg. 63

Page 2 ends

for local and regional events. Ice coverings will enable a variety of programming, events, and community-related uses that maximize the facility’s potential. Examples include, but are not limited to, business meetings, conferences, trade shows, and non-ice sporting events. This would enhance the City’s tourism goals and contribute multiple benefits to the local economy, including significant generation of hotel room nights and increased activity to local businesses.

City staff researched a variety of options prior to recommending IceCap Pro Ice Covers by Becker Arena Products Inc. The professional IceCap Pro product is widely used throughout the industry, including at Nationwide Arena (Columbia Blue Jackets), XCEL Energy Center (Minnesota Wild), and the Honda Center (Anaheim Ducks). The product provides a professional grade “R” rating, which relates to how the insulation reduces cold and is sufficient for uses anticipated by staff. The thickness and durability of the product provides for longevity and the ability to support staging and equipment (forklifts/scissor lifts) suitable for a variety of events.

After performing a cost analysis and reviewing commercial list pricing for comparable products from other sources, it has been determined that the Sourcewell cooperative purchasing contract with Becker Arena Products, Inc., provides competitive pricing, quality service, and the best value to the City. Additionally, there are no local vendors that provide this equipment on a cooperative purchasing contract. This contract was competitively solicited through a nationwide bid process and is valid through 2025.

ALTERNATIVE ACTION

Other action as determined by City Council.

FISCAL IMPACT

This request will not impact the General Fund. Adequate funding was appropriated as part of the Fiscal Year 2022-23 Annual Budget process from the Tourism Marketing District Fund 360 to Expenditure Account 1205120-520106 to provide funding for the procurement of ice coverings.

ATTACHMENTS
Santa Clarita CA Ice Deck Quotation
IceCap Pro Material Specifications
Photo Examples of Event Potential
11 Packet Pg. 64

beckerarena.com
Date: September 27, 2022
Proposal Expiration Date: October 28, 2022
Your Sales Consultant: Chad Minichillo
Quotation #: Santa Clarita Ice Cover

Prepared For: Project Location:

Mr. Christopher Page City of Santa Clarita City of Santa Clarita 23920 Valencia Boulevard 23920 Valencia Boulevard Santa Clarita, CA 91355 Santa Clarita, CA 91355 Quote - Rev 7

Thank you for considering Becker Arena Products, Inc., we appreciate the opportunity…

Benefits of Choosing to Partner with Becker Arena Products • A stable and reliable company since 1988
• A staff with in-depth knowledge of the industry and products • Quality products that last
• Experienced and professional installers
• Excellent customer service
• Worry Free Projects - Guaranteed

This product offering is available through the Sourcewell Cooperative Purchasing Program at discounted pricing. BECKER ARENA PRODUCTS, INC – VENDOR CONTRACT # 120320 ATH

Material Price Escalation & De-Escalation Clause
In the event that the price of any of the material(s) used in the Becker Arena Products, Inc. production of the above product increase or decrease by 3% or greater from the price used for that material(s) at the time the quote was signed, then the price for the material(s) in the contract between Becker Arena Products, Inc. and the purchaser shall be increased or decreased to reflect the additional or reduced cost to obtain that material or materials. Purchaser agrees that Becker Arena Products, Inc. shall be entitled to an adjustment to the contract price to reflect and price increases of material(s) that occur as a result of Becker Arena Products, Inc. incurring additional costs when ordering materials.

11.a
Packet Pg. 65
Attachment: Santa Clarita CA Ice Deck Quotation (Cube Ice Floor Covering Acquisition)

beckerarena.com Page 2

Per your recent request, below please find pricing for the following.

OPTION #1 - 1” ICECAP™ PRO ICE COVER - Becker Arena Products will supply only 529 sheets of the 1” thick IceCap™ insulated ice cover system to cover 17,000 square feet. 1” thick x 4’ x 8’ panels. 525 panels furnished in a waffle design & 4 panels furnished in solid design for in front of the equipment gate.

Current lead time on IceCap is approximately 12-14 weeks after receipt of the order.

TOTAL PRICE DELIVERED $ 168,002.57
Includes 9.5% Sales Tax
Accept ________

OPTION #2 – SUPERVISION OF THE INSTALLATION – Becker Arena Products, Inc. will furnish a supervisor for the initial cutting and installation of the ice floor cover. The owner to furnish a complete crew for the installation of all materials (A crew of three with basic carpentry skills and a table saw). The supervisor is provided for 10 hours over a two-day period. Price includes supervision labor (Non-union / Non-Prevailing wage rate).

TOTAL PRICE SUPERVISION LABOR $6,022.50 Includes 9.5% Sales Tax
Accept ________

OPTION #3 – ARENA DECK STORAGE CARTS – Becker Arena Products, Inc. will supply only 11 ice cover system (stackable) storage carts 54” x 104” OD. Each cart to store 50-sheets of 1” thick IceCap™ panels. *Storage Carts are not included in Sourcewell Contract*

TOTAL PRICE DELIVERED $ 33,288.00
Includes 9.5% Sales Tax
Accept ________

Taxes are the responsibility of the purchaser. Prices do not include special insurance requirements, bonding, or applicable permits and/or license fees. If sales tax is applicable it will be added to the proposal totals and noted on a Contract Summary Sheet that will be sent back with your executed contract.

All payment terms are based on credit approval.

Our Standard Payment terms are:
50% due upon placement of order ($ ___________________) 50% due N/30 days after delivery ($ ___________________)

11.a
Packet Pg. 66
Attachment: Santa Clarita CA Ice Deck Quotation (Cube Ice Floor Covering Acquisition)

beckerarena.com Page 3

We are looking forward to the opportunity of working with you on your project and if we can be of further assistance please do not hesitate to call.

This proposal is subject to Becker Arena Products, Inc. Standard Terms and Conditions and Limited Warranty and may be withdrawn without penalty at any time before contract execution. If accepted, please sign and return this copy to Becker Arena Products. When approved and signed by one of our officers a fully executed copy will be forwarded for your records. This proposal is subject to change, withdrawal or cancellation until accepted by you. If Becker Arena Products, Inc. have not received your acceptance within 60 days from the date hereof, this proposal shall automatically expire. Becker Arena Products, Inc. retains a security interest in all products covered in this agreement until all payment terms have been met. In addition, the purchaser agrees to sign any additional documents for Becker Arena Products, Inc. to perfect its security interest in the products.

Proposal/Contract #Santa Clarita Ice Cover is accepted with initialed options:

_____________________________ _____________________________ Purchaser Signature Becker Arena Products, Inc.

_________________________________ ____General
Manager____________
Title Title

_________________________________ ____Jeff Brosz__________________ Print Name Print Name

_________________________________ ______________________________ Date Date

BECKER ARENA PRODUCTS INC. STANDARD TERMS AND CONDITIONS OF SALE ‐ EFFECTIVE JANUARY 2021

1. Definitions. In these terms ‐"Seller" means the seller of the Goods as defined herein; "Buyer" means the entity purchasing the Goods, including any successors thereof; "Goods" means the goods, products and materials manufactured, imported, supplied and/or delivered for or by Seller to Buyer, as such were approved by Seller in reply to Buyer's order and accordingly listed in the Approval of Order; "Approval of Order", in respect of any Buyer's order, means the instrument issued by Seller, bearing the same reference number of such order and specifying, among any other terms, the items of Goods, including their respective price and quantity, which shall be supplied to Buyer upon such order; "Contract" means the contract for the supply of Goods which have been ordered by Buyer and specified in Seller's Appro val of Order, which contract is concluded based on these Terms and Conditions of Sale unless otherwise specified in the Approval of Order.

2. Payment. Payment for Goods shall be due on or prior to the delivery date of Goods and no discount may be taken. Payments received afte r the due date thereof shall bear a service charge from their due date, at the maximum lawful interest rate applicable, and if none – at the annual rate of 5% above the base rate from time to time of the central bank of the place of Buyer's incorporation. All payments shall be made to Seller's designated bank account in the same currency and for the same amounts as specified in the Approval of Order.

11.a
Packet Pg. 67
Attachment: Santa Clarita CA Ice Deck Quotation (Cube Ice Floor Covering Acquisition)

beckerarena.com Page 4

3. Prices, Duties and Taxes. Prices specified in the Approval of Order are net, excluding packaging, and shall be deemed Ex‐works (Incoterms 2000 as amended). Prices are based, inter alia, on production costs for supplies, labor, deliveries, duties, and services current on the order date. In the event of material increase in any such costs, Seller reserves the right either to adjust the prices for Goods accordingly, or to cancel any certain part of the sales relating to undelivered Goods. Duties, taxes, fees, levies and other compulsory payments applicable to the sale of Goods any time, as well as freight, express, insurance and delivery charges, shall all be borne and paid in full by Buyer, unless otherwise expressly stipulated.

4. Delivery. Delivery dates noted on the Approval of Order are estimates only, and are not guaranteed, and are all subject to adjustment a s determined by the Seller acting reasonably. The acceptance of shipment by a common carrier or by any licensed public truckman shall constitute proper delivery. Risk associated with the Goods shall pass to Buyer on delivery or with the passing of title in the Goods, wh ichever occurs first; provided however, that where delivery is delayed due to circumstances caused by or within the responsibility of Buyer, risk of loss shall pass to Buyer upon Seller's notification that Goods are ready for dispatch.

5. Retention of Title. Title shall pass to Buyer only upon ful l payment by Buyer for the Goods and following payment of any other outstanding debt by Buyer to Seller. Buyer shall, at Seller's request, take any measures necessary under applicable law to protect Seller 's title in the Goods, and lawfully notify Buyer’s present or potential creditors of Seller's title on and interest in the Goods. Buyer acknowledges that so long as title has not been transferred in the Goods, it holds the Goods as bailee and fiduciary agent for the Seller and shall safely and securely store and keep the Goods separate and in good condition, clearly showing the Seller’s ownership of the Goods and shall respectively record the Seller’s ownership of the Goods in its books. Notwithstanding the above, Buyer may use Goods for its own use, or sel l Goods, as fiduciary agent for the Seller, to a third party in the normal course of business by bona fide sale at market value, whereby proceeds of such usage or sale of Goods, as the case may be, shall, to the extent of the amount being owed by Buyer to Seller at the time of receipt of such proceeds, be held by Buyer on trust for Seller and specifically ascertained, until payment in full for all payable debts by Buyer to Seller.

6. Warranty.
a) If applicable, Seller warrants that Goods as set out in the warranty applicable thereto given by Seller to Buyer, subject always to the terms and conditions thereof, and subject to use, storage and application thereof in accordance with and based on Seller's standard tolerances, instructions of use and recommendations. b) Unless otherwise restricted by mandatory applicable law, THE WARRANTY SET FORTH HEREIN IS EXPRESSLY IN

LIEU OF ALL OTHER WARRANTIES, WHETHER EXPRESSED OR IMPLIED, INCLUDING, WITHOUT LIMITATION, ANY AND ALL WARRANTIES OF

MERCHANTABILITY, QUALITY AND FITNESS FOR USE AND FOR PURPOSE, ANY ADVICE AND RECOMMENDATION AND ANY OBLIGATIONS OR LIABILITIES WHICH MAY BE IMPUTED TO SELLER, ANY AND ALL OF WHICH ARE HEREBY EXPRESSLY DISCLAIMED, DENIED AND EXCLUDED. BUYER

EXPRESSLY AGREES THAT NO WARRANTY THAT IS NOT SPECIFICALLY STATED IN THIS AGREEMENT WILL BE CLAIMED OR OTHERWISE ADHERED TO BY BUYER AND/OR BY ANYONE ACTING ON BUYER’S BEHALF AND/OR BY ANYONE DERIVING THE LEGALITY OF ITS CLAIM FROM BUYER, NOR THAT WILL ANY SUCH WARRANTY BE VALID. SELLER NEITHER ASSUM ES NOR AUTHORIZES ANY OTHER PERSON TO

ASSUME FOR IT, ANY OTHER LIABILITY IN CONNECTION WITH THE SALE, USE OR HANDLING OF ANY AND ALL GOODS SPECIFIED OR CONTEMPLATED BY THIS CONTRACT. NO WARRANTY IS MADE WITH RESPECT TO ANY OF THESE GOODS WHICH HAVE BEEN SU BJECT TO ACCIDENT, NEGLIGENCE, ALTERATION, IMPROPER CARE, IMPROPER STORAGE, IMPROPER MAINTENANCE, ABUSE OR MISUSE.

7. Claims and Liability.
a) Unless Seller shall within 30 days after delivery of the Goods, receive from Buyer written notice of any matter or thing by reason whereof it is alleged that Goods are not in accordance with the Contract, Goods delivered shall be deemed to have been supplied, delivered and accepted in all respects in full conformity with the Contract and Buyer shall be entitled neit her to reject the same nor to raise any claim for damages or for other remedy in respect of any alleged negligence and/or breach of warranty and/or any condition. b) In any claim, brought su bject to the conditions above, Buyer must prove to the satisfaction of Seller that it followed Seller's instructions for use, care, storage, maintenance, handling and application of the Goods. c) Unless otherwise specifically restricted by mandatory applicable law, Seller's liability und er any claim and in connection with any possible allegation, whether based on negligence, contract, or any other cause of action, shall, if the Seller shall b e liable hereunder, be limited to either (i) the replacement of the Goods or the supply of equivalent goods; (ii) the repair, or payment of the cost of repair, of the Goods; or (iii) credit in an amount equal to the purchase price specified in Seller's pertinent invoice, or in an amount of equivalent goods, all at Seller's sole option. Buyer acknowledges that the remedy available to h im as specified herein, is in lieu of any remedies that may be otherwise available to him, now or in the future, whether in law or in equity, relating to any loss or damage, whether directly or indirectly, arising from the purchase and/or the use of Goods, including without limitation, any actual or contingent damages, loss of production, loss of profit, loss of use, loss of contracts or any other consequential or indirect loss whatsoever, whether pecuniary or non‐pecuniary, and it is acknowledged and agreed by Buyer that in no circumstances shall Seller be liable for any such damages. Should any limitation on Seller's liability hereunder be held ineffective under applicable law, than Seller's liability shall in any event be limited to the minimum amount of damages to which Seller may limit its liability, where such is greater than the purchase price as specified in Seller's pertinent invoice. Additionally, any action against Seller must be commenced within one year after the cause of action accrues. d) Buye r, for himself and for any other party which may claim either under or through Buyer, or independently of Buyer, including Buyer's employees, directors, officers, representatives and personnel, shall indemnify and hold Seller harmless, from and against any claim or liability for damages in any way relating to the supply or use of the Goods, including claims for negligence and including but not limited to, any claim in connection with the design, manufacture, use, care, storage, delivery, application or maintenance of any Goods sold hereunder, whether alleged to have been committed by Seller or by any other person whatsoever. Buyer's undertaking as specified in this subsection shall extend and inure to the b enefit of Seller and of Seller's successors at any ti me, as well as to Seller's personnel, representatives, managers, directors and officers. Nothing contained herein shall take effect to exclude or limit liability where liability may not be excluded or limited under applicable law, including, without limitation, for death, personal injury and fraudulent misrepresentations. e) Any and all warranties, undertakings, guarantees, or assurances provided herein by Seller, are specifically limited to Buyer herein, and not imputed by Seller, whether directly or indirectly, expressly or impliedly, to any other person or entity, including any subsequent buyer or user, bailee, licensee, assignee, employee and agent of Buyer.

8. Default. Upon failure of Buyer to pay any amounts due to Seller, or in the event of any breach or anticipated breach by Buyer of any Contract with Seller, or if Buyer shall either (i) become insolvent, (ii) call a meeting of its creditors, or (iii) make any assignment for the benefit of creditors, or if (iv) a bankruptcy, insolvency, reorganization , receivership or reorganization proceeding shall be commenced by or against Buyer, then, in each such occasion, Seller may, at its sole discretion, opt to (1) cancel this and any other Contract with Buyer (without waiving any of Seller's rights to pursue any remedy against Buyer); (2) claim return of any Goods in the possession of Buyer, the title of which has not passed to Buyer, and enter Buyer’s premises (or the premises of any associated company or agent where such Goods are located), without liability for

11.a
Packet Pg. 68
Attachment: Santa Clarita CA Ice Deck Quotation (Cube Ice Floor Covering Acquisition)

beckerarena.com Page 5
trespass or any alleged damage, to retake possession of such Goods; (3) defer any shipment hereunder; (4) declare forthwith due and payable all outstanding bills of Buyer under this or any Contract; and/or (5) sell all or part of the undelivered Goods, without notice at public and/or on private sale, while Buyer shall be responsible for all costs and expenses of such sale and be liable to Seller for any shortfall in the discharge of the amounts due to Seller.

9. Independent Delivery. Each delivery of Goods shall (without prejudice to Seller's rights under clause 8 hereinabove) be considered a separate contract and the failure of any delivery shall not vitiate any contract as to deliveries of other Goods and payment therefor.

10. Cancellation. Orders manufactured in whole or in part, pursuant to Buyer's specifications, may not be cancelled except with Seller's prior written consent, on terms which will compensate Seller for any resulting losses.

11. No‐Assignment. No rights or obligations of Buyer arisi ng out of this Contract may be assigned without the express prior written consent of Seller.

12. Force Majeure. Should Seller be prevented from effecting deliveries of the Goods or any of them by reason of either an act of god, insurrection, riot, war host ilities, terror attacks, warlike operations, piracy, arrests, restraints or detainments by any competent authority, strikes o r combinations or lock‐out of workmen, fire, floods, droughts, earthquakes, permanent or temporary delay or inability to obtain labor, material or services through Seller's usual and regular sources, or any other circumstances (whether of a nature similar to those specifi ed, or not) beyond the absolute control of the Seller, then, in each such cases, the obligation of the Seller to ef fect deliveries hereunder shall be suspended until after such prevention shall cease to continue. Should any deliveries under this Contract be suspended under this clause for more than 90 days – either party may withdraw from this Contract and be relieved from any liability; provided however, that Buyer shall nevertheless accept delivery and pay for such Goods once the Seller is able to deliver in accordance with the period(s) of shipment named in this Contract. Seller shall not be liable for, and be relieved from, any loss or damages of any kind resulting from the causes mentioned hereinabove.

13. Advice. Any provisions specified or implied by herein or elsewhere notwithstanding, any advice, recommendation, information, assistance or service provided by Seller in relation to the Goods or in respect of their use or application is given in good faith, shall be deemed accepted by Buyer without imputation of any liability to Seller, and it shall be the responsibility of Buyer to confirm the accuracy and reliability of the same in light of the use of which Buyer makes or intends to make of the Goods.

14. Entire Agreement. This Contract merges the entire terms and conditions for sale of the Goods. In the event of any conflict between the terms herein and any provisions included in the Approval of Order, the latter shall govern and prevail. Subject to the foregoing, nothing specified in, or referred to by, any other document, record or instrument whatsoever, which relates to and/or which otherwise subsists in connection with the sale of Goods herein, whether expressly or impliedly, including any written order, request or other standard or specific terms of any entity, shall or may be interpreted to attribute to Seller and/or to Seller's affiliates or representatives ( i) any liability, obligation, commitment and/or undertaking, and/or (ii) any waiver in connection with or of any right, whether contractual, proprietary, in‐person am and/or equitable, including but not limited to, any and all intellectual property rights in connection with the Goods, which are and shall always remain in the Seller's exclusive and complete ownership under all circumstances whatsoever, notwithstanding any sale of Goods hereunder and whether the Goods shall be standard Goods or manufactured to a specific order. No modification or waiver of any provision hereof shall become valid and effective except upon a written instrument duly signed beforehand by Seller. No waiver by either party of any default of the other party shall be deemed a waiver o f any subsequent or other default. If any provision of this Contract becomes or is declared by a court of competent jurisdiction to be illegal, unenforceable, or void, the balance of this Contract shall continue in full force and effect without the provision.

15. Law and Arbitration. This Contract shall be governed by and construed in accordance with the laws of the state of Seller's incorporation. Any dispute arising out of or in connection with this Contract shall, if so determined by the Seller, be finally settled by arbitration in accordance with the Rules of Conciliation and Arbitration of the International Chamber of Commerce ("ICC"), as shall be in effect from time t o time, and if so determined, the balance of this Section shall apply. The arbitration shall be held at such location in the state of Seller's incorporation as shall be determined by Seller, in its sole discretion. The arbitrator shall be mutually appointed by Seller and Buyer within 21 (twenty‐one) days following a written demand for arbitration by either of the parti es. Failing to reach an agreement regarding the nomination of an arbitrator, the head of the relevant ICC national committee (located in the Seller's country of incorporation; and absent such local committee in that specific country – the ICC UK Committee (www.iccuk.net)) shall appoint an arbitrator at the request of any of the parties, a copy of which request for the appointment of an arbitrator shall be provided by the requesting party to the other party. Awards may be enforced in accordance with the 1958 New York Convention and judgment may be entered upon any award in any court having jurisdiction over the parties and/or their assets.

The arbitrator's fees shall be paid by both parties in equal parts unless otherwise determined by the arbitrator. Thi s provision shall survive any termination of any of the terms and conditions herein and shall be deemed to constitute an independent arbitration agreement between Buyer and Seller for all purposes and intents.

11.a
Packet Pg. 69
Attachment: Santa Clarita CA Ice Deck Quotation (Cube Ice Floor Covering Acquisition)

beckerarena.com Page 6

11.a
Packet Pg. 70
Attachment: Santa Clarita CA Ice Deck Quotation (Cube Ice Floor Covering Acquisition) SpaceAge Synthetics, Ltd. Tel: 701.277.5631 1402 39th Street NW Fax: 701.277.5689 Fargo, North Dakota 58102 USA www.spaceagesynthetics.com

Specifications and Physical Properties of Ice Floor Covering System The proposed ice cover shall be IceCap® Pro as manufactured by SpaceAge Synthetics, Ltd. The ice cover will have the following physical properties and characteristics: Color: Charcoal Grey Texture: Top: Elephant Skin Textured Finish Bottom: Reinforced Open Waffle Pattern Material: 24 lb/ft3 nominal density fiber-reinforced polyurethane Thickness: 1” nominal Sheet Size: 48” wide x 96” long (other sizes available) Sheet Weight: 53 lbs. nominal (1.66 lbs. per square foot) R-Value (ASTM C518): 2.44 Compression per ASTM D1621: Modulus – 22300 psi Strength@10% strain- 1100 psi Tensile per ASTM D638: Modulus – 20100 psi Strength – 1700 psi Flexural per ASTM C790: Modulus- 141400 psi Strength - 3405 psi Coefficient of Thermal Expansion per ASTM D696: 2.3x10-5 in/in/degF Coefficient of Friction ASTMD1894 Static Kinetic Dry 1.072 0.984 Wet 1.323 1.232 Fire-Testing UL94 Euroclass - EN 13501-1 : C-s1 Classification Warranty: 5-year Limited S Y N T H E T I C S , LTD . ISO 9001:2008 Registered

11.b
Packet Pg. 71
Attachment: IceCap Pro Material Specifications (Cube Ice Floor Covering Acquisition)

11.c
Packet Pg. 72
Attachment: Photo Examples of Event Potential (Cube Ice Floor Covering Acquisition)

Page 1 ends

Agenda Item: 12

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: SEASONS BROCHURE PRINTING AND DISTRIBUTION

CONTRACT
DEPARTMENT: Recreation and Community Services
PRESENTER: Lance O'Keefe

RECOMMENDED ACTION
City Council:

1. Award a one-year contract to QWP Direct Mail Services, Inc., with up to three additional one-year renewal options beginning in year two, for the printing and mail preparation of the SEASONS magazine in an amount not to exceed $278,669; and authorize a contingency of $27,867 for a total annual amount not to exceed $306,536, plus an adjustment consistent with the appropriate Consumer Price Index, upon request of the contractor.

2. Increase Brochure expenditure budget 1005102-510104 by $120,214 in fiscal year 2022-23 and $140,571 ongoing budget in fiscal year 2023-24, plus the cost of any Consumer Price Index increase.

3. Authorize the City Manager or designee to execute up to three additional one-year renewal options beginning in year two, not to exceed the annual contract amount plus an adjustment consistent with the appropriate Consumer Price Index, upon request of the contractor.

4. Authorize the City Manager or designee to execute all contracts and associated documents, and modify the awards in the event impossibility of performance arises, and execute all documents subject to City Attorney approval.

BACKGROUND
SEASONS is the City of Santa Clarita’s (City) award-winning quarterly magazine, which provides listings of sports, programs, and recreation offerings, as well as information about what is happening in the City. SEASONS is mailed to every residential household within the City limits four times each year.
12 Packet Pg. 73

Page 2 ends

The City conducted a Request for Proposal (RFP) to solicit proposals from qualified vendors for the printing and mail preparation of SEASONS magazine. The proposals were reviewed and evaluated based on each vendor’s ability to meet the specific needs of the City. The RFP was advertised on the City’s website on July 21, 2022. Nineteen companies downloaded the RFP, and two proposals were received. Written proposals were scored according to four categories:

• Background, references, experience, credentials, technical competence, and financial stability
• Ability to provide the services
• Quality of printed samples
• Pricing

A panel of three City staff members evaluated and scored all responsive proposals based on the selection criteria above. The results are shown below:

Rank Company Score Location
1 QWP Direct Mail Services, Inc. 99 Santa Clarita, CA 2 SC Publishing, Inc. 72 Santa Clarita, CA

Staff recommends that QWP Direct Mail Services, Inc. (Mellady Direct Marketing) be awarded the contract for the printing and mail preparation of SEASONS magazine for an initial term of one year, with an option of three additional one-year term renewals.

ALTERNATIVE ACTION

Other action as determined by the City Council.

FISCAL IMPACT

Upon approval of the recommended action, expenditure account 1005102-510104 will be increased by $120,214, as funds were previously appropriated by the City Council through the adoption of the Fiscal Year 2022-23 annual budget. Effective Fiscal Year 2023-24, expenditure account 1005102-510104 would increase by $140,571, plus the cost of any Consumer Price Index increase.
12 Packet Pg. 74

Page 1 ends

Agenda Item: 13

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: CENTRAL PARK - CIVIC ART PROJECT
DEPARTMENT: Economic Development
PRESENTER: Phil Lantis

RECOMMENDED ACTION
City Council:

1. Award a contract to Sujin Lim in the amount of $85,000 for the public art piece, “When Cloud Met a Cloud,” to be located at Central Park.

2. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.

BACKGROUND
On September 28, 2021, the City Council approved the plans and specifications of the Central Park Buildout Project, inclusive of a public art component. At the same time, funding was appropriated for the design, construction, and installation of public artwork, in accordance with the City’s Public Art Planning and Selection process, at the site of the buildout.

An Artist Selection Committee (Committee) was formed at the Arts Commission meeting on January 13, 2022, consisting of the following members:
• Arts Commissioner, Susan Shapiro
• Arts Expert, Miguel A. Del Real, Public Artist
• Professional Art Administrator, Rebecca Rothman, Public Art Manager, Tempe, Arizona • Local Professional Artist, Laura Malone Hunt
• Community Member, Kathie Martin, Communications Manager, SCV Water Agency The Committee met on February 17, 2022, to develop the Request for Qualifications with the call summary, design guidelines, project guidelines, and evaluation criteria. 13 Packet Pg. 75

Page 2 ends

The Request for Qualifications was posted online from April 28 to May 27, 2022. A total of 16 applications were submitted. The Committee scored the applications using the following criteria:

• Creativity and innovation of design
• Relationship to the site, considering aspects of the unique physical, cultural, natural, and/or historical features of Central Park and the City of Santa Clarita • Structural and surface soundness and proposed materials that can withstand outside and uncovered weather conditions, as well as inherent resistance to theft, vandalism, and excessive maintenance and repair costs
• Strength and appropriateness of artists’ past completed work • Responsiveness to the history theme

Three finalists were interviewed on September 9, 2022, which led to the Committee selecting artist Sujin Lim’s concept proposal, “When Cloud Met A Cloud.” On October 13, 2022, the Arts Commission reviewed the Committee’s selection and recommended that it go before the City Council for final approval.

A visualization of the recommended artwork is provided as an attachment. It is estimated to stand approximately 15 feet tall and 20 feet wide, consisting of three cloud shapes sitting on 10 gradient-colored raindrops. To honor the site’s history, the artist designed the sculpture to emulate the value of water and the meaning of SCV Water for those in the surrounding area. If approved, it would be sited in the plaza area adjacent to the parking lot expansion.

ALTERNATIVE ACTION

Other action as determined by the City Council.

FISCAL IMPACT

Upon approval of the recommended action, funding for this project is available in Expenditure Account A4001602-516101 (Central Park Public Art).

ATTACHMENTS
Sujin Lim - Artist Concept
13 Packet Pg. 76

13.a
Packet Pg. 77
Attachment: Sujin Lim - Artist Concept (CENTRAL PARK - CIVIC ART)

13.a
Packet Pg. 78
Attachment: Sujin Lim - Artist Concept (CENTRAL PARK - CIVIC ART)

13.a
Packet Pg. 79
Attachment: Sujin Lim - Artist Concept (CENTRAL PARK - CIVIC ART)

13.a
Packet Pg. 80
Attachment: Sujin Lim - Artist Concept (CENTRAL PARK - CIVIC ART)

13.a
Packet Pg. 81
Attachment: Sujin Lim - Artist Concept (CENTRAL PARK - CIVIC ART)

13.a
Packet Pg. 82
Attachment: Sujin Lim - Artist Concept (CENTRAL PARK - CIVIC ART)

Page 1 ends

Agenda Item: 14

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: PUBLIC ART PLANNING AND SELECTION PROCESS UPDATE DEPARTMENT: Economic Development
PRESENTER: Phil Lantis

RECOMMENDED ACTION
City Council approve updates to the Public Art Planning and Selection Process.

BACKGROUND
In 2016, the City Council approved the Arts Master Plan (Plan), which has become the Arts Commission's guiding document to provide arts, entertainment, and cultural development throughout the community. Since adoption, the Arts Commission has been working to address the original 41 recommendations in the Plan and the additional 20 recommendations that were added when the Plan was updated in 2021.

As recommended in the Plan, the City Council approved the Public Art Planning and Selection Process (Process), described in Recommendation 1.1, in 2016. The Process has offered a systematic approach for thoughtful planning to ensure meaningful community engagement.

The Arts Commission offered revisions, which were then approved by the City Council on September 22, 2020.

Since the last update in 2020, the Arts Commission has identified additional efficiencies and clarifications that are being proposed in order to enhance the Process. The proposed revisions are attached, with changes indicated in yellow highlight, and summarized below:
• Renaming “Call for Artists” to “Request for Qualifications (RFQ)” or “Request for Proposals (RFP)” to better align with the City of Santa Clarita’s purchasing norms • Creating a draft RFQ/RFP before the formation of the Artist Selection Committee with potential locations, parameters, mediums, or other key recommendations • Incorporating additional opportunity for the Public Art Consultant to review and provide input before rating commences
14 Packet Pg. 83

Page 2 ends

• Reducing City Council review times from 30 days to 15 days to provide for faster project delivery
• Establishing a screening process that allows the Public Art Consultant and member of the Arts Commission to eliminate ineligible applications, prior to rating • Implementing a survey to be taken by the members of the Artist Selection Committee at the end of each project, as a means to solicit feedback on ways to improve the Process.

The proposed updates maintain that, at various stages of the Artist Selection Committee level, the Arts Commission level, or the City Council level, any artist/project proposal can be rejected and the process can begin again. With the approval of the attached Public Art Planning and Selection Process, new projects will be able to go through a clearer and consistent process.

At their Study Session held on May 26, 2022, the Arts Commission reviewed the revised language and recommended that the City Council approve the updated Process.

ALTERNATIVE ACTION

Alternative action as determined by the City Council.

FISCAL IMPACT

There is no fiscal impact associated with this item.

ATTACHMENTS
Public Art Planning and Selection Process 2022 - Changes Highlighted 14 Packet Pg. 84

Public Art Planning and Selection Process

Prepared by Arts Commission
Draft – May 2022

14.a
Packet Pg. 85
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS) 2 | Page

Table of Contents

Introduction 3
Public Art Phases 3

1. Project Identification 4

2. Request for Qualifications/Request for Proposals Development 4

3. Jurying 5

4. Proposed Project Selection 5

5. Appeal Period 6

6. Fabrication / Installation 6

7. Promotion 7
Conclusion 7

14.a
Packet Pg. 86
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS) 3 | Page

INTRODUCTION
In fall 2016, the City of Santa Clarita City Council approved the Arts Master Plan, which has become the Arts Commission’s guiding document to provide arts, entertainment, and cultural development throughout the community. Since adoption, the Arts Commission prioritized the development of a public art program as one of the highest priorities expressed by the community and key stakeholders.

As recommended in the Arts Master Plan, the City Council approved the Public Art Planning and Selection Process (Recommendation 1.1), which has offered a systematic approach for thoughtful planning to ensure meaningful community engagement. The recommendation is as follows:

Plan Recommendation 1.1 - The City should implement a public art planning and selection process that utilizes peer review and community input to ensure that public art pieces meet the goals of providing enjoyable and attractive public spaces that reflect the character of the community.

The Public Art Planning and Selection Process has seven phases, from the initial project identifications to the installation and promotion of the final public art-work. The seven phases are as follows:

1. Project Identification

2. Request for Qualifications/Request for Proposals Development

3. Jurying

4. Proposed Project Selection

5. Appeal Period

6. Fabrication / Installation

7. Promotion
The initial five phases are intended to be addressed annually as part of the annual budget cycle, with the last two phases having various different timelines based on the scope and scale of the project.

14.a
Packet Pg. 87
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS) 4 | Page

Phase 1: PROJECT IDENTIFICATION
Identification of public art projects are determined through the allocated funding streams, below:
 Capital Improvement Projects (CIP) are determined through the eligibility from the Civic Art Policy
 Temporary Public Art is a set budget item
 Other projects as determined through funding availability

For identified projects through Civic Art funding, every effort will be made to include planning for the Public Art as early as possible, preferably prior to/in conjunction with architectural design. The earlier the Public Art consultant, in particular, can be apprised of the project parameters and goals, the more effectively they can recommend approaches, and contribute to proposing locations, medium, etc. for the art project. The following will meet to identify parameters, goals, etc. for the public art projects for each CIP project. The Public Art Consultant will provide a summary of findings with examples of relevant public art projects to share with staff and the Public Art Committee.
 Arts Commission Public Art Committee
 Arts division staff
 CIP consultants
 Engineering division staff
 Public Art Consultant

The Arts Commission will include the identified public art projects with recommendations, approach, and proposed locations in the annual Public Art Report. City staff and the Public Art Consultant will review recommendations, approach, and proposed locations with departments associated with the project. The final step for the first phase is to have City Council review the annual Work Plan and Public Art Report during the annual joint Study Session.

14.a
Packet Pg. 88
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS) 5 | Page

Phase 2: REQUEST FOR QUALIFICATIONS/REQUEST FOR PROPOSALS

DEVELOPMENT
During phase two, the Arts Commission Public Art Committee, Public Art Consultant and City staff will create recommendations for a public art piece, including potential locations, parameters, medium(s) or other key recommendations based on the following:
 Full review of the design, concept, and construction of the project  Role of public art as it relates to the design, budget, and goals of the project  Input from project managers, architects, and key stakeholders for the project

These recommendations will be utilized to create a draft Request for Qualifications (RFQ)/Request for Proposals (RFP). The RFQ/RFP will address the goals and nature of the project, potential themes, budget allocation, location, approach, potential community engagement plan, and written to appeal to the artist who would best meet those needs (medium, experience, local, regional or national, style and process). The RFQ/RFP will address potential application questions and a specific list of application requirements. These draft documents will be shared with the Public Art Consultant for review.

An Artist Selection Committee (Committee) will be formed for each public art project identified in the Arts Commission Public Art Report. The Arts Commission Chair will approve the Committee, which will be comprised of the following members:
 Arts Commissioner
 Professional Public Artist or Art Expert
 Professional Arts Administrator or Art Expert
 Local Professional Artist
 Community Member or Representative of key stakeholder group

Once the Committee members are appointed, the Committee will meet with staff, the Public Art Consultant, and a member of the Arts Commission Public Art Committee to receive an overview of the project, a description of the artist selection process, and to review the draft RFQ/RFP.

After the Committee provides input, the documents will be updated and shared with the Public Art Consultant for review, and then shared with the Committee for final review. The RFQ/RFP

14.a
Packet Pg. 89
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS) 6 | Page

will be placed on the next Arts Commission agenda for approval. If approved, the Arts Commission will ask for staff to draft a memo to be sent to City Council for review.

Phase 3: JURYING
Once the memo to City Council has been reviewed for 15 days, the RFQ/RFP will be released through a website for entry submissions and online jurying. The RFQ/RFP will also be promoted locally and regionally through various email lists and media outlets. The RFQ/RFP will be open for 30 days unless specified by the Committee.

The Public Art Consultant, the Public Art Committee and City staff will review the number of submittals to determine if there are a sufficient number of candidates, or if the deadline should be extended. If the number of submittals is determined to be an unreasonable amount, then the applications will be reviewed by the Public Art Consultant and a member of the Arts Commission Public Art Committee or a member of the Artist Selection Committee to go through a process to eliminate ineligible applications based on the RFQ/RFP.

The Committee will individually rate the submitted artists based on past work, application questions, and application requirements. The website will compile the individual votes of the Committee members and identify the top potential semi-finalists. The Committee will then identify the top three to five semi-finalists to develop a project proposal. The reason for this range is that it is recommended for larger projects to have additional artists develop a project proposal, to allow for more options in the next steps.

Once the semi-finalists have been identified, staff will contact the semi-finalists and contract with them to provide a Community Engagement Plan and/or develop their project proposal. This will depend on the requirements stated in the RFQ/RFP.

Phase 4: PROPOSED PROJECT SELECTION
Semi-finalists will be given 30 calendar days to develop and submit a project proposal, including but not limited to; project description, site specific requests, materials, proposed budgets, detailed concept drawings and exhibits, and a maintenance and conservation plan. The semi- finalists will present their project proposal to the Committee, staff, Public Art Committee member, and Public Art Consultant. These presentations will be made by video conference.

14.a
Packet Pg. 90
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS) 7 | Page

By consensus, the Committee will select the project proposal to be recommended to the Arts Commission. The Committee may jointly give revisions to the semi-finalists to refine and revise the proposal for either a second-round interview or final project proposal.

If the Committee does not reach consensus regarding the semi-finalists they may revisit phase three or begin again, at phase two. Revisiting phase three, the Committee could pull the next highest rated submissions to interview. Beginning at phase two, the Committee would review the RFQ/RFP to determine the clarity and define the expectations of the project.

The Arts Commissioner on the Committee presents the recommended project proposal to the Arts Commission for approval. If the Arts Commission does not approve the recommended project proposal, then the process begins again at phase two, with a review of the RFQ/RFP and the opportunity to change the members of the Committee for that project.

The final step of this phase is for a memo to be drafted to City Council to inform them of the approved project proposal.

After each project a survey will be shared with the Committee to provide feedback on the selection process and for any recommendations or comments based on their experience. The survey should be created by staff, the Public Art Consultant, and at least one member of the Arts Commission Public Art Committee.

Phase 5: APPEAL PERIOD
A 15-day appeal period will begin once the City Council receives the memo for review of the approved project proposal. The appeal can be made by a City Council member or a member of the community. If a project proposal is appealed by a City Council member, no fee will be charged. If a project proposal is appealed by a community member there will be a fee charged to the community member of $750. This fee is to cover the staff time required to prepare the appeal.

If a project proposal is appealed by a City Council member or the community the project will be added to the next available City Council meeting agenda. The agenda report will include all of the background information required for the City Council to make their determination. A City staff will present to the City Council all of the details on the selection process and reasons for why the project proposal was selected. If there is no appeal within the 15-day appeal period, then staff will execute the contract with the artist.

14.a
Packet Pg. 91
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS) 8 | Page

Phase 6: FABRICATION/INSTALLATION
When the artist for each project is selected and a contract has been executed, then the artist will be paid dependent of the terms of the contract. This is done to assist the artist in purchasing the materials needed to create the art-work. If the artist does not deliver their final public art piece, action will be taken to recoup the costs that had been paid.

The artist has a pre-determined and agreed upon amount of time to complete the fabrication of the public art piece. This can vary greatly due to the nature of the piece, the size and scale needed, and the location the public art piece will be installed in. Several public art projects are part of CIP’s, which will require flexibility and communication between the Arts and Events division staff and the Engineering division staff. During the fabrication stage, the artist will keep staff up to date on their progress, and staff will give updates to the Committee and the Arts Commission.

The artist will work with staff to install their completed public art piece once it has been fabricated. Often the installation step involves input from staff of various divisions within the City of Santa Clarita, including Building and Safety, Capital Improvement Projects, Traffic, Parks, and Special Districts. Once the public art piece is installed, the artist will receive their final payment.

Phase 7: PROMOTION
When an installation date has been determined between the artist and staff, the Communications division will be contacted to promote the public art piece and dedication ceremony.

The dedication ceremony should be held as soon after the installation of the piece as possible, and should be held on the weekend to increase attendance. Invitations for the ceremony will go to City leadership, the Committee, the artist, and the public.

Finally, public art piece will be added to various websites for information and promotional purposes. These sites will include the SantaClaritaArts.com and the Public Art Archive, which is the national registry for public art projects. Much like the phase above, the timing of this phase will vary greatly depending on the timeline of the public art project and its maintenance plan.

14.a
Packet Pg. 92
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS) 9 | Page

CONCLUSION
During the development of the public art program the Arts Commission found it prudent to refine the Public Art Planning and Selection Process to best reflect the ongoing public art program.

The Arts Commission is pleased to present the public art program to continue to enliven the community. With the approval of this Public Art Planning and Selection Process, new projects will be able to go through a clear and consistent process. It is crucial to emphasize that at various stages in the process, at the Committee level, the Arts Commission level, or the City Council level, if appealed, any project proposal can be rejected and the process can begin again.

This is important to remember as the goal of the public art program is to expose the community to high quality public art pieces that will engage and hopefully encourage appreciation for the role public art can play in place-making and community identity.

14.a
Packet Pg. 93
Attachment: Public Art Planning and Selection Process 2022 - Changes Highlighted (PUBLIC ART PLANNING AND SELECTION PROCESS)

Page 1 ends

Agenda Item: 15

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: November 22, 2022
SUBJECT: FIRST READING OF AN ORDINANCE TO ADOPT THE 2022

CALIFORNIA BUILDING STANDARDS CODE WITH LOCAL

AMENDMENTS
DEPARTMENT: Community Development
PRESENTER: John Caprarelli

RECOMMENDED ACTION
City Council introduce an ordinance entitled “AN ORDINANCE OF THE CITY COUNCIL OF

THE CITY OF SANTA CLARITA, CALIFORNIA, REPEALING AND REPLACING TITLES 18 THROUGH 22, TITLE 24, AND CHAPTER 25.01 OF TITLE 25; AND ADOPTING BY REFERENCE THE 2022 CALIFORNIA ADMINISTRATIVE, BUILDING, RESIDENTIAL,

ELECTRICAL, MECHANICAL, PLUMBING, ENERGY, EXISTING BUILDING,

HISTORICAL BUILDING, FIRE, GREEN BUILDING STANDARDS, AND REFERENCED STANDARDS CODES WITH CERTAIN APPENDICES AND LOCAL AMENDMENTS;” waive reading of text and consent to read by title only as listed on the agenda; pass to second reading; and set the public hearing for December 13, 2022.

BACKGROUND
State Code Adoption Process
The California Building Standards Code (Building Code) is updated and published every three years under the direction of the California Building Standards Commission. The Building Code comprises Title 24 of the California Code of Regulations and is intended to provide for the safety and welfare of all citizens through the implementation of the latest technology, materials, engineering, construction, and sustainability methods, as regulated by the latest adopted building codes.

The State of California (State) mandates that local jurisdictions adopt and commence enforcement of the latest State building codes within six months of the adoption by the State.

The City of Santa Clarita (City) has complied with this requirement since incorporation in 1987.

Recently, the State published the 2022 Building Code with an effective date for enforcement of January 1, 2023. The City must adopt the 2022 Building Code to be in compliance with State 15 Packet Pg. 94

Page 2 ends

law.

The proposed ordinance repeals the 2019 Building Code and adopts the 2022 Building Code along with local amendments, which comprises the following titles and chapters of the Santa Clarita Municipal Code:

Title 18, City Building Code
Title 19, City Electrical Code
Title 20, City Plumbing Code
Title 21, City Mechanical Code
Title 22, City Fire Code
Title 24, City Energy Conservation Code
Title 25, Chapter 25.01, City Green Building Standards Code

Local Amendments to the State Codes
State law allows local jurisdictions to amend the Building Code where deemed necessary to address adverse local conditions related to climate, geology, and/or topography. The proposed City amendments included in this ordinance provide for improved standards for both fire and earthquake protection for buildings constructed throughout the City. These provisions are consistent with amendments being adopted by other jurisdictions in the Southern California region, and similar to those adopted by the City during the last code cycle. Examples of amended building standards include:

• Higher fire classifications for roofing materials
• Improved seismic design and construction provisions for wood-framed structures • Prohibition on un-reinforced concrete foundations
• Prohibition on permanent wood foundations

The proposed amendments also set forth administrative provisions providing for enforcement, collection of fees, and clarifying work that is exempt from permits, all of which are consistent with the City’s current practices and adopted amendments. Please refer to the attached amendments for more detailed information.

As part of an outreach effort to involve local stakeholders, Building and Safety staff conducted a public meeting at City Hall on October 26, 2022, to review the proposed local amendments and explain the Building Code adoption process. Invitations were sent to local contractors, design professionals, developers, and others in the construction industry. At the meeting, the public had an opportunity to evaluate and provide input regarding the proposed amendments. No opposition to the proposed amendments was received. Building and Safety staff additionally notified the Building Industry Association of the code adoption and proposed City amendments.

Public Hearing Requirement
In accordance with Government Code Section 50022.3, a public hearing will be held at the next City Council meeting on December 13, 2022, to consider adoption of the ordinance. The format for holding a public hearing at the second reading rather than at the first reading is specifically set forth in this Government Code section. Prior to adoption, a public notice will be duly published as required, and a copy of the proposed codes and amendments will be available in the 15 Packet Pg. 95

Page 3 ends

City Clerk’s office for public review prior to the public hearing.

Effective Date
The ordinance establishes an effective date of January 1, 2023, to commence enforcement of the 2022 Building Code. This date conforms to the effective date established by the State for mandatory enforcement of the new Building Code. Any application for a building permit submitted on or after that date will be subject to the provisions of the 2022 Building Code along with local amendments.

ALTERNATIVE ACTION
Should the City Council elect not to adopt the proposed State codes and local amendments, the City would still be required to enforce the new State codes as set forth in Health & Safety Code 17922 and 17958 et al. Additionally, the updated local amendments, if not adopted, would not be enforceable.

Failure to adopt the ordinance could also result in a downgrading of the City’s Insurance Services Office (ISO) rating, thereby negatively affecting the insurance rates paid by property owners for new construction.

FISCAL IMPACT

This ordinance does not increase permit-related fees nor does it modify any fees charged to the public for Building and Safety provided services.

ATTACHMENTS
2022 SCBC Ordinance
2022 Justifications
15 Packet Pg. 96

Page 1 of 3 ends

ORDINANCE NO. 22-

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, REPEALING AND REPLACING TITLES 18 THROUGH 22, TITLE 24, AND CHAPTER 25.01 OF TITLE 25; AND ADOPTING BY REFERENCE THE 2022

CALIFORNIA ADMINISTRATIVE, BUILDING, RESIDENTIAL, ELECTRICAL,

MECHANICAL, PLUMBING, ENERGY, EXISTING BUILDING, HISTORICAL BUILDING,

FIRE, GREEN BUILDING STANDARDS, AND REFERENCED STANDARDS CODES

WITH CERTAIN APPENDICES AND LOCAL AMENDMENTS

WHEREAS, the State of California (State) requires by its Government Code that local jurisdictions adopt the latest State Building Standards Code; and

WHEREAS, the State has adopted and published the 2022 California Administrative, Building, Residential, Electrical, Mechanical, Plumbing, Energy, Existing Building, Historical Building, Fire, Green Building Standards, and Referenced Standards Codes comprising Title 24 of the California Code of Regulations, Parts 1 through 12, with each becoming effective on January 1, 2023; and

WHEREAS, the State allows local jurisdictions to amend said codes in accordance with Health and Safety Code Section 18941.5 (b) where necessary to reasonably address adverse local conditions related to climate, geology, and/or topography; and

WHEREAS, the City Council finds the local topography consists of natural hillsides, canyons, and rugged terrain that can contribute to accelerated spread of wildfires, and the local climate consists of hot, dry, and wind conditions during the summer and fall creating fire hazards that warrant enhanced construction provisions for fire safety; and

WHEREAS, the City Council also finds the local geology consists of an active earthquake fault, geologic formations, and areas subject to liquefaction presenting a significant earthquake risk that warrants enhanced design and construction provisions for structural safety; and

WHEREAS, the City Council also finds the need to modify and/or add certain administrative provisions to effectively enforce the regulations contained in the 2022 California Building Standards Code; and

WHEREAS, this ordinance repeals the current City Building, Electrical, Plumbing, Mechanical, Fire, Energy Conservation, and Green Building Standards Codes and amendments thereto and adopts the new 2022 California Administrative, Building, Residential, Electrical, Mechanical, Plumbing, Energy, Existing Building, Historical Building, Fire, Green Building Standards, and Referenced Standards Codes with local amendments; and

WHEREAS, enforcement of the 2022 California Building Standards Code is mandated by the State to commence on January 1, 2023.

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, DOES HEREBY ORDAIN AS FOLLOWS:

15.a
Packet Pg. 97
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE)

Page 2 of 3 ends

SECTION 1. That current Titles 18 through 22, Title 24, and Chapter 25.01 of Title 25 are hereby repealed.

SECTION 2. Titles 18 through 22, Title 24, and Chapter 25.01 of Title 25 of the Santa Clarita Municipal Code are replaced with the latest editions of the 2022 State codes with local amendments, outlined as follows and to read as attached:

TITLE 18, CITY BUILDING CODE
TITLE 19, CITY ELECTRICAL CODE
TITLE 20, CITY PLUMBING CODE
TITLE 21, CITY MECHANICAL CODE
TITLE 22, CITY FIRE CODE
TITLE 24, CITY ENERGY CONSERVATION CODE
TITLE 25, Chapter 25.01, CITY GREEN BUILDING STANDARDS CODE

SECTION 5. This ordinance shall become effective and in full force on January 1, 2023.

SECTION 6. The City Clerk shall certify to the passage of this ordinance and shall cause the same to be published as required by law.

PASSED, APPROVED, AND ADOPTED this 13
th day of December 2022.

MAYOR
ATTEST:

CITY CLERK

DATE:

15.a
Packet Pg. 98
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE)

Page 3 of 3 ends

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.

CITY OF SANTA CLARITA )

I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Ordinance No. 22- was regularly introduced and placed upon its first reading at a regular meeting of the City Council on the 22nd day of November 2022. That thereafter, said Ordinance was duly passed and adopted at a regular meeting of the City Council on the 13th day of December 2022, by the following vote, to wit:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

AND I FURTHER CERTIFY that the foregoing is the original of Ordinance No. 22- and was published in The Signal newspaper in accordance with State Law (G.C. 40806).

CITY CLERK

15.a
Packet Pg. 99
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE)

City of Santa Clarita

BUILDING CODE
Enforceable January 1, 2023

Adopting the 2022 California Building Standards Code
with City Amendments
This document contains the following titles of the Santa Clarita Municipal Code:

TITLE 18 - CITY BUILDING CODE
TITLE 19 - CITY ELECTRICAL CODE
TITLE 20 - CITY PLUMBING CODE
TITLE 21 - CITY MECHANICAL CODE
TITLE 22 - CITY FIRE CODE
TITLE 24 - CITY ENERGY CONSERVATION CODE
TITLE 25, CHAPTER 25.01 - CITY GREEN BUILDING CODE

15.a
Packet Pg. 100
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 1 Title 18

CITY BUILDING CODE
Chapters:

18.01 Adoption of the City Building Code

18.02 Amendments to CBC Chapter 1 Division II; Scope and Administration

18.03 Amendments to CBC Chapter 15; Roof Assemblies and Rooftop Structures

18.04 Amendments to CBC Chapter 16; Structural Design

18.05 Amendments to CBC Chapter 17; Structural Tests and Special Inspections

18.06 Amendments to CBC Chapter 18; Soils and Foundations

18.07 Amendments to CBC Chapter 19; Concrete

18.08 Amendments to CBC Chapter 23; Wood

18.09 Amendments to CBC Chapter 25; Gypsum Board and Plaster

18.10 Amendments to CBC Appendix G; Flood Resistant Construction

18.11 Amendments to CRC Chapter 1; Division II; Administration

18.12 Amendments to CRC Chapter 3; Building Planning

18.13 Amendments to CRC Chapter 4; Foundations

18.14 Amendments to CRC Chapter 5; Floors

18.15 Amendments to CRC Chapter 6; Wall Construction

18.16 Amendments to CRC Chapter 8; Roof-Ceiling Construction

18.17 Amendments to CRC Chapter 9; Roof Assemblies

18.18 Amendments to CRC Chapter 10; Chimneys and Fireplaces

18.19 Amendments to CEBC Chapter 5, Prescriptive Compliance Method

15.a
Packet Pg. 101
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 2 Chapter 18.01

ADOPTION OF THE CITY BUILDING CODE

Sections:

18.01.010 Adoption of the City Building Code

18.01.010 Adoption of the City Building Code

There is hereby adopted by reference that certain code known and designated as the California Code of Regulations, Title 24, Parts 1, 2, 2.5, 8,10, and 12 as published by the California Building Standards Commission as further described and including the following:

2022 California Administrative Code (California Code of Regulations Title 24, Part 1) 2022 California Building Code (California Code of Regulations Title 24, Part 2) based on the 2021 International Building Code® as prepared by the International Code Council, and as amended by the State of California
2022 California Residential Code (California Code of Regulations Title 24, Part 2.5) based on the 2021 International Residential Code® as prepared by the International Code Council, and as amended by the State of California
2022 California Historical Building Code (California Code of Regulations Title 24, Part 8) 2022 California Existing Building Code (California Code of Regulations Title 24, Part 10) based on the 2021 International Existing Building Code® as prepared by the International Code Council, and as amended by the State of California
2022 California Referenced Standards Code (California Code of Regulations Title 24, Part 12)

Such code shall include those sections requiring enforcement by the local building department, and as further amended by the City of Santa Clarita with provisions intended to address local climatic, geologic, and topographic conditions, as permitted by state law.

Adoption of said code shall include the adoption of
Appendix C Group U-Agricultural Buildings, Appendix G Flood Resistant Construction, Appendix I Patio Covers, and Appendix J Grading, contained in the 2022 California Building Code and Appendix AH Patio Covers, contained in the 2022 California Residential Code.

Such code shall become and be the City of Santa Clarita Building Code, regulating the erection, construction, alteration, repair, relocation, demolition, occupancy, use, height, area, and maintenance of all buildings and structures, and certain equipment t herein specifically regulated. The provisions of said code shall provide for the issuance of permits and certificates of occupancy, and collection of fees thereof, and providing penalties for violation of such code.

The City of Santa Clarita Building Code shall become effective for all new building permit applications received by the city on or after January 1, 2023.

References in city forms, documents, and regulations to the chapters and sections of former editions of the City of Santa Clarita Building Code shall be construed to apply to the corresponding provisions contained within the current edition of City of Santa Clarita Building Code.

At least one copy of the City of Santa Clarita Building Code shall be maintained and kept available for reference and examination by the public at the city’s Permit Center public counter.

15.a
Packet Pg. 102
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 3 Chapter 18.02
AMENDMENTS TO CHAPTER 1 DIVISION II; SCOPE AND ADMINISTRATION,

OF THE CALIFORNIA BUILDING CODE
Sections:

18.02.005 Chapter 1 Division II is Amended

18.02.010 Section 101.1 is Amended

18.02.020 Section 103.1 is Amended

18.02.030 Section 105.2 is Amended

18.02.040 Section 105.2.3 is Added

18.02.050 Section 105.3.2 is Amended

18.02.060 Section 105.5 is Amended

18.02.070 Sections 105.5.2 and 105.5.3 are Added

18.02.080 Section 105.8 is Added

18.02.090 Section 107.1 is Amended

18.02.100 Section 109.2 is Amended

18.02.110 Section 109.2.1 is Added

18.02.120 Section 109.4 is Amended

18.02.130 Section 109.6 is Amended

18.02.140 Section 110.3.6 is Amended

18.02.150 Section 110.3.13 is Added

18.02.160 Section 110.7 is Added

18.02.170 Section 110.8 is Added

18.02.180 Section 110.9 is Added

18.02.190 Section 113.3 is Amended

18.02.200 Section 113.4 is Added

18.02.210 Sections 114.2.1 and 114.2.2 are Added

18.02.220 Section 114.4 is Amended

18.02.230 Section 117 is Added

18.02.240 Section 118 is Added

18.02.005 Chapter 1 Division II is Amended
The following sections of Chapter 1 Division II of the California Building Code, as adopted by Chapter

18.01 hereof, are added, deleted or amended as follows:

18.02.010 Section 101.1 is Amended
Section 101.1 is amended to read as follows:

101.1 Title. These regulations, including all duly adopted local amendments, shall be known as the Santa Clarita Building Code and shall be used in conjunction with the provisions of Title 24, California Code of Regulations, mandated by the State of California to be enforced by the local authority having jurisdiction, and shall hereinafter be referred to as “this code.”

18.02.020 Section 103.1 is Amended
Section 103.1 is amended to read as follows:

103.1 Creation of enforcement agency. There is established within the City of Santa Clarita the Building & Safety division under the administrative and operational control of the City Building Official hereafter referred to as the Building Official.

15.a
Packet Pg. 103
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 4 18.02.030 Section 105.2 is Amended
Section 105.2 is amended to read as follows:

105.2 Work Exempted from Permit. Exemptions from the permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of the City of Santa Clarita including such requirements as may be established by any city department or division or the requirements of any other governing agency. Unless otherwise exempted, separate plumbing, electrical, and mechanical permits will be required for any such items exempted herein.

Permits shall not be required for the following:

Building:

1. One-story detached light-framed structures accessory to a Group R-3 or U occupancy used as tool and storage sheds, playhouses, trellis structures, gazebos, arbors, greenhouses and similar uses where the gross floor area does not exceed 120 square feet as measured to the outside walls or support posts and the structure complies with all of the following conditions:
a. The floor is not more than 30 inches above the adjoining grade, b. The overall height is not more than 14 feet as measured from adjacent grade, c. The structure is not constructed on a slope steeper than 3:1, d. The structure is not within a flood hazard or floodplain, e. The structure has no permanent heating or air-conditioning, f. The location of the structure is approved by the city’s Planning Division.

Notes:
1) Storage or tool sheds over 120 square feet but not exceeding 250 square feet in area that meet the above conditions may be constructed under a ‘foundation only’ permit. Such permit may include the installation of one 20 Amp branch circuit, (1) light fixture and one (1) 110/115 V. GFCI outlet.
2) It is permissible that these structures still be regulated by Section 710A despite exemption from permit.

2. Where allowed by the city’s Planning Division, chain link or wire fences not over 12 feet in height, wood, vinyl, or open wrought iron fences not over 6 feet in height, and block walls or pilasters not over 42 inches in height where not constructed within a flood hazard or floodplain.

3. Sidewalks and driveways which are not more than 30 inches above adjacent grade and not over any basement or story below, and are not part of an accessible route as required per Chapter 11A or 11B of this code.

4. Decks or platforms accessory to a Group R-3 or U occupancy that are not more than 30 inches above adjacent grade or constructed over a slope or in a flood hazard or floodplain.

5. Exterior hardscape features such as patios, seating walls, walkways, stepped walks or stairs integrated in a slope, koi ponds, fountains or similar water features not over 18 inches in depth, raised planters and similar hardscape features that are accessory to a Group R-3 or U occupancy.

6. Canopies, awnings, or open trellises that do not extend more than 36 inches from the exterior wall of a building or, if attached to a Group R, Division 3, or Group U occupancy, do not extend more than 54 inches and are not within 3 feet of the property line.

7. Retaining walls that are not over 4 feet in height measured from the bottom of the footing to the top of the wall, or where supporting a slope or surcharge, not more than 30 inches in height measured from bottom of footing to the top of the wall. For ‘dry stacked’ interlocking retaining wall systems such as ‘keystone walls’ the maximum exempt height is 36 inches above the lowest adjacent grade or 18 inches where supporting a slope or surcharge. This exemption does not apply to retaining walls constructed on a slope steeper than 3:1, located in a floodplain, or impounding Class I, II or IIIA liquids.

8. Fixed or moveable cases, racks, shelving, and partitions not exceeding 6 feet in height. The

15.a
Packet Pg. 104
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 5 installation of such elements shall not reduce aisle widths, clearances or means of egress to less than that required by this code.

9. The installation of decorative moldings, trim, window treatments, wall coverings, painting, papering, tiling, carpeting, hardwood or tile flooring, counters or countertops, tub or shower surrounds and similar interior finish work. Notwithstanding, all such materials and work shall comply with applicable provisions of Chapter 8 of this code for allowable materials, combustibility and fire performance.

10. Garage and closet organizers, cabinets, or shelving not exceeding 8 feet in height within a Group R-3 or U occupancy.

11. Drywall within Group U occupancies not required to be part of a fire rated assembly.

12. The installation of replacement window units where installed within existing frames and where no stucco or siding is removed, provided the following conditions are met:
a. The net opening area of the existing window(s) is not reduced to less than that required by this code for light and ventilation
b. Any required egress (emergency escape) window is replaced with an egress (emergency escape) window complying with this code.
c. The provisions of this code for safety glazing are met.

13. Satellite dishes not exceeding 30 inches in diameter where attached to a structure, or 36 inches in diameter where ground mounted and not exceeding 15 feet in height.

14. Radio or television antennae towers where ground mounted and not exceeding 30 feet in height.

15. Light standards which do not exceed 20 feet in height (electrical permits are required).

16. Flagpoles not exceeding 20 feet in height where not attached to or erected on any building or structure.

17. Prefabricated swimming pools or spas accessory to a Group R-3 occupancy provided that:
a. The capacity does not exceed 5,000 gallons
b. The pool or spa is not constructed on a slope greater than 3:1 c. The lowest point of the bottom of the pool or spa is not more than 24 inches below adjacent grade
d. The pool or spa is provided with a safety barrier as required in the California Health & Safety Code
An electrical permit is required for any permanently connected pumps or motors.

18. Removal and replacement of the plaster finish of a swimming pool or spa accessory to a Group R- 3 occupancy provided that:
a. No mechanical, electrical, or plumbing elements are being added, altered, or removed. b. The swimming pool or spa is equipped with at least two of the drowning prevention safety features listed in Health and Safety Code section 115922. c. The pool or spa is equipped with anti-entrapment grates as specified in Health and Safety Code section 115928.5.

19. Structures or equipment accessory to a Group R occupancy which are intended solely for play or amusement, and which are clearly identifiable as play or amusement structures as determined by the Building official, and which are no more than 14 feet in height above adjacent grade. These structures may include, but are not limited to: swings, slides, climbing structures and similar playground equipment, skateboard or bike ramps, pool slides whether built-in or free standing, basketball standards, tennis or sports courts (not including fencing or lighting), and similar structures. Notwithstanding, such structures must comply with all applicable zoning standards for use and location. Where a permanently constructed pool slide or other landscape feature also serves as part of a retaining wall, such portions of the construction that act as a retaining wall require a permit unless specifically exempted here in. An electrical permit is required for any permanently connected lighting or other electrical equipment.

20. Tree houses provided that:
a. The floor area does not exceed 64 square feet;

15.a
Packet Pg. 105
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 6 b. The ceiling height does not exceed 6 feet;
c. The tree house is not constructed in an oak tree.
d. The tree house does not have mechanical, electrical, or plumbing elements.

21. Temporary sheds, construction trailers, and other structures incidental to work authorized by a valid grading or building permit. Electrical and plumbing permits are required when there are any such connections associated with the temporary shed or construction trailer. Any such structure shall be removed upon completion of the work covered by the permit or expiration of the permit.

22. Tents, inflatable structures, and similar canopy structures, where used in conjunction with a special event, that are open on at least three sides and do not exceed 500 square feet in projected area, or where enclosed on two or more sides, that do not exceed 300 square feet in enclosed area.

Notwithstanding, all such structures shall be adequately anchored to resist local wind forces.

23. Temporary stages or platforms that do not exceed 30 inches in height that are used in conjunction with a special event.

24. Shade cloth structures constructed solely for nursery or agricultural purposes, not including service systems within such structures.

25. Temporary motion picture, television, and theater stage sets and scenery.

26. Gantry cranes and similar equipment.

27. Prefabricated water tanks supported directly on grade where the capacity does not exceed 5,000 gallons and the ratio of height to the diameter or width does not exceed one and one-half to one (1½ :1).

28. The following work when conducted in association with an operating oil field:
a. Oil derricks;
b. Installation and relocation of process vessels and tanks; c. Construction, installation and relocation of process piping and pipe supports; d. Construction, installation and relocation of ladders, stairs, and catwalks; e. Installation of foundations for process vessels, pipe supports, generators, tanks, pumps, and uninhabited buildings located more than 20 feet from any property line; f. Construction, installation, and relocation of uninhabited buildings; g. Road maintenance;
h. Grading of new and existing well pads, provided the grading does not affect an adjoining property;
i. Grading and construction for erosion control, provided it does not affect an adjoining property;
j. Debris basin maintenance;
(Note: The waiver of a building permit shall not be deemed as a waiver from the oil field operator from obtaining the required clearances from other public agencies.)

Electrical:

Note: refer to the 2022 California Electrical Code with local amendments for additional exemptions

1. Low-voltage wiring for security systems, telephone or other communication systems, door bells, intercom or sound systems, television cable, and similar installations within a Group R-3 or U occupancy.

2. Electrical equipment used for commercial radio and television transmitting stations, excluding any equipment or wiring for the power supply to any such station.

Mechanical
Note: refer to the 2022 California Mechanical Code with local amendments for additional exemptions

1. Portable equipment including heating appliances, ventilation equipment, air-conditioning or evaporative cooling units.

2. Self-contained refrigeration systems containing 10 pounds or less of refrigerant and actuated by motors of 1 horsepower or less.

15.a
Packet Pg. 106
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 7 18.02.040 Section 105.2.3 is Added
Section 105.2.3 is added to read as follows:

105.2.3 Repairs and Maintenance. Application or notice to the Building Official is not required for ordinary maintenance or repairs to structures. In no case shall the repair or maintenance work create an unsafe condition or violate any provision of this code or any other applicable regulation. Such repairs shall not include the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam, brace, or load-bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a structure affecting the egress requirements.

Ordinary repairs shall not include addition to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent, or similar piping, electric wiring, mechanical or other work affecting public health or general safety.

Permits shall not be required for the following repair or maintenance work:

1. General building maintenance.

2. Painting, papering, carpeting and similar work.

3. Repair of minor portions of a building or structure damaged by dry-rot, termites, or deterioration provided the elements being replaced do not reduce the integrity of the building or structure.

4. Repairs to a roof on a building or structure not exceeding 10 percent of the total roof area or 200 square feet, whichever is less, provided such exempt limits are not exceeded within any one-year period of time.

5. Drywall repairs not exceeding 200 square feet when not part of a fire rated assembly.

6. Replacement of panes of glass within existing frames provided the provisions of this code for safety glazing are met. Note: refer to exemption 12 under Section 105.2 ‘Work Exempted from Permit; Building”, herein, for additional requirements that may apply.

7. Replacement of any component part of mechanical or electrical equipment provided it does not alter approval of such equipment or make such equipment unsafe.

8. Replacement of any faucet, sink, water closet, shower head or similar plumbing fixture with a fixture of like type. Notwithstanding, the replacement of such fixtures shall comply with applicable provisions of the California Plumbing Code and California Green Building Standards Code for water-conserving fixtures.

9. Replacement of any kitchen appliance, non-commercial hood, exhaust or ceiling fan, lighting fixture, lamp or bulb, or similar item with a fixture, appliance, or other item of like type.

10. The clearing of stoppages or the repairing of leaks in drains, water, soil, waste or vent pipe, provided, however, that if any concealed trap, drainpipe, water, soil, waste or vent pipe or valve becomes necessary to remove and replace the same with new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in this code.

18.02.050 Section 105.3.2 is Amended
Section 105.3.2 is amended to read as follows:

105.3.2 Time limitation of application. An application for which no permit is issued within twelve months following the date of application shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the Building Official. The Building Official is authorized to grant one or more extensions, each for a period not to exceed 180 days, upon request by the applicant under all of the following conditions:

1. The applicant submits a written request for such extension showing justifiable cause;

2. An administrative fee as established must be paid at the time the extension is granted;

3. Where there have been changes to governing codes under which the plans were originally

15.a
Packet Pg. 107
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 8 submitted, the plans shall be revised to reflect any such changes as a condition of the extension. Additional plan review fees will apply in such cases.

18.02.060 Section 105.5 is Amended
Section 105.5 is amended to read as follows:

105.5 Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within twelve months after its issuance as evidenced by a valid inspection of work by the building department. In such cases where the work authorized on the site by such permit has commenced and is then suspended or abandoned for a period of 180 days after the time the work is commenced the permit shall become inactive. The Building Official is authorized to grant one or more extensions for periods of time not to exceed 180 days each, or to reactivate a permit as provided for in section 105.5.2 and 105.5.3.

18.02.070 Sections 105.5.2 and 105.5.3 are Added
Sections 105.5.2 and 105.5.3 are added to read as follows:

105.5.2 Reactivation of an Expired Permit. The Building Official may approve the reactivation of a permit that has become invalid (either expired or inactive), upon written request by the permittee, under the following conditions:

1. The suspension or abandonment of work has not exceeded two years;

2. The permittee demonstrates justifiable cause for the extension;

3. Where there have been changes to the governing codes under which the permit was originally issued, the Building Official may require any work that has not been installed or completed to meet the provisions of the most current governing codes as a condition of reactivation.

105.5.3 Fees. In order to renew action on a permit after it has become invalid, the permittee shall pay a fee as determined by the Building Official not to exceed 50 percent of the original permit fee. Any permit extensions subsequent to an initial extension require the payment of an administrative fee as determined.

18.02.080 Section 105.8 is Added
Section 105.8 is added to read as follows:

105.8 Combined Building Permits. A combination permit may be issued for a single project when it is determined that the same contractor is licensed so as to perform all of the proposed work associated with the project and it is reasonable to combine the permits into a single permit.

The following permits may be combined:

1. A combined building permit may be issued for new one-family or two-family dwellings including additions or alterations thereto. Such permits will include all building, electrical, plumbing, heating, ventilating and air-conditioning work but will not include fire sprinkler installations, sewer connections in the public right-of-way, or grading work requiring a permit as specified in the Unified Development Code.

2. A combined permit may be issued for multi-family residential or non-residential construction projects under similar conditions as listed under number one (1) above when prior approval has been granted by the Building Official.

3. A combined building permit may be issued for a swimming pool and shall include excavation and finish grading for construction of the pool and related landscaping, construction of the pool structure, decking, pool equipment enclosure walls, and all such plumbing and electrical work as required for the pool.

4. A combined permit may be issued for a commercial sign and shall include all structural and

15.a
Packet Pg. 108
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 9 electrical work required to install the sign.

Combined permits shall not be issued for separate work which is entirely unrelated and under separate trades such as building and electrical.

The combined building permit shall be subject to the requirements of this code, the Electrical Code, the Plumbing Code, the Mechanical Code, the Energy Code and the Green Building Standards Code. The fee for the combined building permit shall be as provided for in Section 109 herein including amendments.

18.02.090 Section 107.1 is Amended
Section 107.1 is amended to read as follows:

107.1 General. Submittal documents consisting of construction documents, statement of special inspections, geotechnical report and other data shall be submitted with each permit application.

Submittal documents may be submitted in electronic format as determined by the Building Official.

The construction documents shall be prepared by a registered design professional as outlined in the California Business and Professions Code or as determined by the Building Official. Where special conditions exist, the Building Official is authorized to require the construction documents to be prepared by a registered design professional.

Exception: (no change)

18.02.100 Section 109.2 is Amended
Section 109.2 is amended to read as follows:

109.2 Schedule of permit fees. On buildings, structures, alterations, additions, electrical, gas, mechanical and plumbing systems, or any other work requiring a permit, a fee for each permit shall be paid as established by the City Council. Where a combined permit is issued, the permit fee shall include the combined fees for applicable building, electrical, mechanical, plumbing, and sewer work.

18.02.110 Section 109.2.1 is Added
Section 109.2.1 is added to read as follows:

109.2.1 Plans Examination Fees. When submittal documents are required by Section 107.1 a plan review fee shall be paid in full at the time of submittal of the construction documents to the building department. Said fee shall be as established by the City Council. When submittal documents are incomplete or changed by the applicant so as to require additional plan review or when the project involves deferred submittal items as defined in Section 107.3.4.1, an additional plan review fee shall be charged for such additional time as may be required to review all such additional work.

18.02.120 Section 109.4 is Amended
Section 109.4 is amended to read as follows:

109.4 Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical, or plumbing system for which a permit is required by this code before obtaining the necessary permits shall be subject to an investigation fee whether or not a permit is then or subsequently issued. The investigation fee shall be equal to twice the amount of the permit fee. Payment of such fee shall not exempt any person from compliance with all other provisions of this code nor from any other penalty prescribed by law.

18.02.130 Section 109.6 is Amended
Section 109.6 is amended to read as follows:

15.a
Packet Pg. 109
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 10 109.6 Refunds. The Building Official may authorize refunding of any fee paid hereunder which was erroneously paid or collected.

The Building Official may authorize refunding of not more than 80 percent of the permit fee paid, excluding issuance fees or plan review fees, when no work has been done under a permit issued in accordance with this code and the applicant has submitted a written request to cancel said permit along with the original signed permit, inspection record card, and construction placard.

The Building Official may authorize refunding of not more than 80 percent of the plans examination fee paid, excluding any application fee, when an application for a permit for which a plan review fee has been paid is withdrawn or canceled prior to commencing any plan review.

The Building Official shall not authorize refunding of any fee paid except on written application filed by the original applicant or permittee not later than 90 days after the date the permit or application for permit has expired, become inactive, been cancelled, or passed a final inspection.

18.02.140 Section 110.3.6 is Amended
Section 110.3.6 is amended to delete the exception allowed under this section which excludes the need for an inspection of gypsum board that is not part of a fire-resistance-rated assembly or a shear assembly.

18.02.150 Section 110.3.13 is Added
Section 110.3.13 is added to read as follows:

110.3.13 Reinspections. A reinspection fee may be assessed for each inspection or reinspection under any of the following conditions:

1. When such portion of work for which inspection is called is not complete and ready.

2. When corrections previously called for by the inspector have not been made.

3. When the approved plans are not readily available to the inspector at the time of the requested inspection.

4. When access to the jobsite is not available at the time the inspection was scheduled.

5. When there is a deviation from the approved plans related to the work to be inspected and such deviation was not previously reviewed and approved by Building & Safety staff.

In instances where a reinspection fee has been assessed, no additional inspection of the work will be performed until the required fee has been paid.

18.02.160 Section 110.7 is Added
Section 110.7 is added to read as follows:

110.7 Construction Placard and Inspection Record Card. Work requiring a building permit shall not be commenced until the permit holder or the permit holder's agent have posted in a conspicuous location at the construction site, a construction placard provided by the Building Official at the time of permit issuance. Said placard shall not be removed until final approval of the work by the building department. The inspection record card shall also be made available so as to allow the Building Official or his designated representative to conveniently make the required entries thereon regarding inspection of the work.

The Inspection Record Card shall serve as temporary approval to occupy and/or use the described project for up to ten (10) working days following the Final Approval date, when signed with a Final

15.a
Packet Pg. 110
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 11 Approval by the Building Official or his designated representative.

18.02.170 Section 110.8 is Added
Section 110.8 is added to read as follows:

110.8 Inspections during declared emergencies. The Building Official may authorize the performance of inspections required under this section to be performed by registered design professionals or by registered deputy inspectors, for repair work during a declared emergency. The persons performing the inspections shall submit a report, to the satisfaction of the Building Official, demonstrating that the work they inspected conformed to the requirements of all applicable codes.

The report will be similar to those required by Section 1704.2.4 of this code.

18.02.180 Section 110.9 is Added
Section 110.9 is added to read as follows:

110.9 Special Inspector registration. Any person who acts in the capacity of a Special Inspector as defined in Chapter 2 of this code for any project within the City of Santa Clarita requiring special inspections as outlined in Chapter 17 must be registered with the City of Santa Clarita to act in such capacity. In order to be registered, a person must pay a registration fee as established by the city Council and demonstrate to the satisfaction of the Building Official that he or she is qualified to perform those types of special inspections for which he or she is registered. Upon registration, a registration card will be issued to the individual by the Building Official. Registration may be revoked for due cause as determined by the Building Official.

18.02.190 Section 113.3 is Amended
Section 113.3 is amended to read as follows:

113.3 Qualifications. The Board of Appeals shall consist of those persons currently serving on the Planning Commission as appointed by the City Council.

18.02.200 Section 113.4 is Added
Section 113.4 is added to read as follows:

113.4 Filing of Appeals. All appeals shall be made in writing and shall state specifically the order, decision, or determination made by the Building Official which is being appealed and wherein the Building Official erred in making the order, decision, or determination. The appeal shall be accompanied with a fee as established by the City Council. If, after reviewing the information submitted, the Building Official determines that the appeal does not merit a change in his order, decision, or determination, then the Building Official shall schedule a hearing by the Board of Appeals and the appellant shall be notified of the date and time of the hearing.

18.02.210 Sections 114.2.1 and 114.2.2 are Added
Sections 114.2.1 and 114.2.2 are added to read as follows:

114.2.1 Recordation of Notice of Violation. The Building Official may record a notice with the Los Angeles County Registrar-Recorder that a property, building or structure, or any part thereof, is in violation of any provision of this code provided the provisions of this section are followed. The provisions of this section are cumulative with other provisions of this code and any other enforcement actions permitted by this code. A notice of violation may be placed upon the title of a property when violation of the building codes have been verified and documented to exist on the site.

15.a
Packet Pg. 111
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 12 The following procedures are established for recordation of Notice of Violation:
a. If (1) the Building Official determines that any property, building or structure, or any part thereof is in violation of any provision of this code; and if (2) the Building Official gives written notice as specified below of said violation; and if (3) within 45 days of said notice, the property, buildings, or structures thereon are not brought into compliance with this code, then the Building Official may, in his sole discretion, at any time thereafter record with the Los Angeles County Registrar-Recorder a notice that the property and/or any building or structure located thereon is in violation of this code.

b. Notice shall be provided in writing in accordance with the following:

1. The notice shall be mailed registered, certified or first-class mail, or may be posted at the site if the site is occupied;

2. The notice shall be addressed to the owner as indicated on the latest county roll;

3. The notice shall specify what violations are being investigated or have been observed or verified;

4. The notice shall indicate what mitigation action is required by the property owner and the time frame in which to commence and complete such mitigation;

5. The notice shall indicate that a notice of violation may be recorded with the Los Angeles County Registrar-Recorder by the Building Official should said violation(s) not be mitigated within 45 days of the date of the notice.

114.2.2 Termination of Notice of Violation. When the property owner has demonstrated to the Building Official that violations of the building code no longer exist, and all fees to cover the cost of the investigation of the violations have been paid to the city, as established by the City Council, the Building Official shall terminate the notice of violation upon the written request of the property owner.

18.02.220 Section 114.4 is Amended
Section 114.4 is amended to read as follows:

114.4 Violation penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, alters, or repairs a building or structure in violation of the approved construction documents or directive of the Building Official, or of a permit or certificate issued under the provisions of this code, is guilty of a misdemeanor punishable by a fine not exceeding $1,000 or by imprisonment not exceeding six months, or by both such fine and imprisonment (see Section 17995 of the California Health and Safety Code). Such person shall be guilty of a separate offense for each and every day or portion thereof during which any violation of any of the provisions of this code is committed, continued, or permitted to remain.

Further, violators of this code may be subject to administrative citation and general penalties as provided for in Title 23 of the Santa Clarita Municipal Code.

18.02.230 Section 117 is Added
Section 117 is added to read as follows:

Section 117 Prohibited Uses of Building Sites

117.1 Flood and Debris Hazard Sites. Buildings, other structures or appurtenances (including but not limited to walls and fences of any height) and fill are not permitted in an area determined by the city to be subject to flood hazard by reason of inundation, overflow, other special flood and debris hazards or erosion except as discussed in this section.

117.2 Geologic Hazard Sites. Any site or property determined or suspected to have a geologically hazardous condition or pose a potential threat to nearby properties shall be subject to the provisions of this section.

15.a
Packet Pg. 112
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 13 117.2.1 No building permit shall be issued when the Building Official finds that property outside the site of the proposed work could be damaged by activation or acceleration of a geologically hazardous condition, and such activation or acceleration could be attributed to the proposed work for which the permit is requested. For the purpose of this section, geologically hazardous condition does not include surface displacement due to earthquake faults.

117.2.2 Work requiring a building permit by this code is not permitted in an area determined by the Building Official to be subject to hazard from landslide, settlement or slippage. These hazards include those from loose debris, slopewash, and the potential for mudflows from natural slopes or graded slopes. For the purpose of this section, landslide, settlement or slippage does not include surface displacement due to the earthquake faults.

117.2.3 Subject to the conditions of section 117.2.1 permits may be issued in the following cases:

a. When the applicant has submitted a geological and/or engineering report or reports which show that the hazard will be eliminated prior to the use of occupancy of the land or structures by modification of topography, reduction of subsurface water, buttressing, a combination of these methods, or by other means.

b. When the applicant has submitted a geological and/or engineering report or reports which contain sufficient data to show that the site appears to be in no danger for the intended use.

c. When the applicant has submitted a geological report which indicates that the site appears to be geologically safe for the proposed use but is located in an area subject to a hazard of a geological nature. However, before a permit is issued, the owner first shall record in the Department of Registrar-Recorder the findings of such report or reports, together with an agreement relieving the city and all officers and employees thereof of any liability for any damage or loss which may result from the issuance of such permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the Department of Registrar-Recorder a statement that he finds such hazard no longer exists.

d. When the work involves the alteration or minor repair of existing structures and the cost of such alteration or repair does not exceed 25 percent of the value of the existing structure, such value to be based on assumed continuation of the established legal use.

Before a permit is issued, the owner shall record in the office of the Department of Registrar-Recorder (1) a statement that he or she is aware that the records of the Building Official indicate that the property is subject to a physical hazard of a geological nature and (2) an agreement relieving the city and all officers and employees thereof of any ability for any damage or loss which may result from issuance of such a permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the office of the Department of Registrar-Recorder a statement that he finds such hazard no longer exists. The repair work shall consist of restoring the original construction. Provision may be made for adjustment of the floor in anticipation of future settlement. For the purposes of this section "alteration" does not include an addition or additions.

e. When the work involves an addition or additions to an existing structure but is not a change in use or occupancy and such work does not increase the area of the structure by more than 25 percent of the area of the structure. Before a permit is issued, the applicant shall submit a geological and/or engineering report or reports complying with the provisions of Section 117.6 which contains a finding that the proposed increased use of the site will not be geologically unsafe, and the owner shall record in the office of the Department of Registrar-Recorder (1) the finding of such report or reports and (2) an agreement relieving the city and all officers and employees thereof of any liability for any

15.a
Packet Pg. 113
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 14 damage or loss which may result from the issuance of such a permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the office of the Department of Registrar- Recorder a statement that he finds a hazard no longer exists.

f. When the work involves a one-story, light-frame accessory structure not intended or used for human occupancy and not exceeding 400 square feet in area nor greater than 12 feet in height.

g. When the work involves the repair of single-family residences and accessory buildings where the cost of such repair exceeds 25 percent of the value of the existing building or involves the replacement of such structures where the loss to be replaced was due to causes other than landslide, settlement or slippage. Before a permit is issued the owner shall:
1) Record in the office of the Department of Registrar-Recorder (1) a statement that he or she is the owner and that he or she is aware that the records of the Building Official indicate that the property is subject to a physical hazard of a geological nature and (2) an agreement relieving the city and all officers and employees thereof of any liability for any damage or loss which may result from issuance of such a permit. This agreement shall provide that it is binding on all successors in interest of the owner and shall continue in effect until the Building Official records in the office of the Department of Registrar-Recorder a statement that he finds such hazard no longer exists.
2) Submit calculations and plans for the proposed reconstruction prepared by a registered civil engineer and designed to minimize damage while accommodating the amount of vertical and horizontal displacements which he or she determines are probable or which have occurred since the original structure was built, whichever is the greater.

h. Notwithstanding any other provisions of this section, the Building Official may, at his discretion, deny a permit for any building, structure or grading subject to a hazard of a geological nature which cannot be mitigated and may endanger the health or safety of the occupants, adjoining property, or the public.

117.3 Fills Containing Decomposable Material. Permits shall not be issued for buildings or structures regulated by this code within 1,000 feet of fills containing rubbish or other decomposable material unless the fill is isolated by approved natural or man-made protective systems or unless designed according to the recommendation contained in a report prepared by a licensed civil engineer.

Such report shall contain a description of the investigation, study and recommendation to minimize the possible intrusion, and to prevent the accumulation of explosive concentrations of decomposition gases within or under enclosed portions of such building or structure. At the time of the final inspection, the civil engineer shall furnish a signed statement attesting that the building or structure has been constructed in accordance with his or her recommendations as to decomposition gases required herein.

117.4 Conditional Use. Work required by this section as a condition for the use of the site shall be performed prior to the connection of the utilities or occupancy of the building.

117.5 Methane Gas Hazard Sites. Permits shall not be issued for buildings or structures regulated by this code on, adjacent to, or within 200 feet of active, abandoned or idle oil or gas well(s) unless designed according to recommendations contained in a report prepared by a licensed civil engineer and approved by the Building Official. As used in this section, "well" shall mean any well as defined by Section 3008, subdivisions (a) and (b) of the California Public Resources Code.

117.6 Geology and Engineering Reports. The Building Official may require an engineering geology or geotechnical engineering report, or both, where in his opinion such reports are essential for the evaluation of the safety of the site. The engineering geology or geotechnical engineering report or

15.a
Packet Pg. 114
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 15 both shall contain a finding regarding the safety of the building site for the proposed structure against hazard from landslide, settlement, or slippage and a finding regarding the effect that the proposed building or grading construction will have on the geologic stability of the property in question and properties immediately adjacent. Any engineering geology report shall be prepared by a certified engineering geologist licensed by the State of California. Any geotechnical engineering report shall be prepared by a civil engineer qualified to perform this work, such as a geotechnical engineer experienced in soil mechanics. When both an engineering geology and geotechnical engineering report are required for the evaluation of the safety of a building site, the two reports shall be coordinated before submission to the Building Official.

117.7 Earthquake Faults.

1. General. The construction of a building or structure near a known active earthquake fault and regulated by this code shall be permitted as set forth in this section.

2. Scope. The provisions of this section shall apply only to permits for buildings or structures on individual lots or parcels and are not intended to be supplementary to geologic investigations required to qualify divisions of land as set forth in the Uniform Development Code of the City of Santa Clarita.

3. Definition. For the purpose of this section, a "geologist" shall be a registered geologist, licensed by the California State Board of Registration for Geologists and Geophysicists to practice geology in California.

4. Known Active Earthquake Faults. For the purpose of this section, known active earthquake faults are those faults which have had displacement within Holocene time (approximately the last 11,000 years) as defined in the most current issue of Special Publication 42 of the California Division of Mines and Geology.

5. Earthquake Fault Maps. Special studies zone maps within the City of Santa Clarita prepared under Sections 2622 and 2623 of the California Resources Code which show traces of earthquake faults are declared to be, on the date of official issues, a part of this code. Special studies zones maps revised under the above sections of the California Resources Code shall, on the date of their official issue, supersede previously issued maps. Copies of each of the above maps shall be available for examination by the public at the city. The city shall maintain maps available to the public showing the location of known active earthquake faults. In the absence of additional information, the location of known active earthquake faults shall be as shown on special studies zones maps.

6. Construction Limitations. No building or structure shall be constructed over or upon the trace of a known active earthquake fault in the following cases:

a. When the proposed building is within 50 feet of that line designated as the location of a known active earthquake fault on the aforementioned maps. b. When the proposed building is within 50 feet of the most probable ground location of the trace of a known active earthquake fault shown on the aforementioned maps.

In cases when a geologist has not made such a determination, the city may require the excavation of a trench, as a subsurface exploration for the purpose of determining the absence of a known active earthquake fault. Such a trench will be required if a lack of distinguishable fault features in the vicinity prevents the city from determining by a site examination, review of available aerial photographs, or by other means that the fault trace does not underlie the proposed building. The trench shall be approximately perpendicular to the most probable direction of the fault trace, at least 18 inches wide, and at least five feet in depth measured from natural grade, or to a depth satisfactory to the city.

The trench must be accessible for mapping and inspection by the city, when requested, and meet the requirements of Title 8 of the California Code of Regulations, Construction Safety Orders.

The trench need not extend further than the full width of the proposed structure plus five feet beyond the traversed exterior walls. A known active earthquake fault shall be presumed nonexistent if an exposure is not found in the walls or floor of the trench. The city may require a more extensive investigation by a geologist as evidence to the absence of a known active

15.a
Packet Pg. 115
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 16 earthquake fault prior to the issuance of a building permit.

Exception: The provisions of this section do not apply to:

1. One-story, light-frame buildings classified as R-3 and U occupancies and not exceeding 1,000 square feet in area or 12 feet in height.

2. Alterations or repairs to an existing building provided that the aggregate value of such work within any 12 month period does not exceed 50 percent of the value of the existing building.

3. Swimming pools, retaining walls, fences and minor work of a similar nature.

7. Special Studies Zones. Work within the special studies zones established under Sections 2622 and 2623 of the California Public Resources Code shall comply with State laws, policies, criteria, rules and regulations applicable to such work. Fees established by Chapter 7.5 of Division 2 of the California Public Resources Code shall be collected and disbursed as required by State law. In addition to the State regulations, the provisions of this section shall apply when geologic investigations, mapping, aerial photographs, other acceptable data or Special Studies Zones Maps show the location of a known active earthquake fault as described in this section.

18.02.240 Section 118 is Added
Section 118 is added to read as follows:

Section 118 Fire Hazard Zones ("Very High Fire Hazard Severity Zones")

118.1 General. For the purpose of this code, Fire Hazard Zones are those areas in the City of Santa Clarita that have been designated as Very High Fire Hazard Severity Zones (VHFHSZ) by the Director of the California Department of Forestry and Fire Prevention and as shown on a map titled "City of Santa Clarita Fire Zone Map" retained on file by the city's Building & Safety Division. Such map is declared to be, on the date of issue, a part of this code. Should revisions be made to the map at the recommendation of the Director of the California Department of Forestry and Fire Prevention, the revised map, at the date of issue, shall supersede the previously issued map.

118.2 Scope. The provisions of this section shall apply to new construction on individual lots or parcels that are located in a Fire Hazard Zone as determined from the City of Santa Clarita Fire Zone Map for which an application for a permit is submitted.

118.3 Construction requirements for buildings or structures in the Fire Hazard Zone 118.3.1 General. Any building or structure hereafter erected, constructed, altered, added onto, or moved within or into a Fire Hazard Zone shall comply with all applicable provisions of Chapter 7A or Section R337 of this code.
118.3.2 Roof covering repair or replacement. Roof covering on an existing building or structure that is being repaired or replaced shall comply with Section 1512 of this code. 118.3.3 Exterior wall covering of existing buildings. Where the exterior wall covering of an existing building or structure is being repaired or replaced and the cumulative area being repaired or replaced is greater than 50 percent of the total existing wall area, both the new and existing wall covering shall comply with the provisions of Section 707A or Section R337.7 of this code in their entirety. The provisions of this section shall be cumulative over any one-year period. 118.3.4 Exterior windows and doors of existing buildings. Where exterior windows and/or doors of an existing building are being replaced with new windows and/or doors, and where the number of windows and/or doors being replaced is greater than 50 percent of the total number of windows and/or doors on the building, all windows and/or doors on the building shall comply with Section 708A or Section R337.8 of this code. The provisions of this section shall be cumulative over any one-year period.

15.a
Packet Pg. 116
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 17 Chapter 18.03
AMENDMENTS TO CHAPTER 15; ROOF ASSEMBLIES AND ROOFTOP

STRUCTURES, OF THE CALIFORNIA BUILDING CODE

Sections:

18.03.005 Chapter 15 is Amended

18.03.010 Table 1505.1 is Amended

18.03.020 Section 1505.1.2 is Amended

18.03.030 Section 1512.2.1.2 is Added

18.03.040 Section 1512.2.2 is Added

18.03.050 Section 1512.6 is Added

18.03.005 Chapter 15 is Amended
The following sections of Chapter 15 of the California Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.03.10 Table 1505.1 is Amended
Table 1505.1 is amended as follows:

TABLE 1505.1

MINIMUM ROOF COVERING CLASSIFICATION
FOR TYPES OF CONSTRUCTION a

IA IB IIA IIB IIIA IIIB IV VA VB

B B B B B B B B B
For SI: 1 foot = 304.8 mm, 1 square foot = 0.0929 m2
a. Unless otherwise required in accordance with Chapter 7A.

18.03.020 Section 1505.1.2 is Amended
Section 1505.1.2 is amended to read as follows:

1505.1.2 Roof coverings within all other areas. The entire roof covering of every existing structure where more than 50 percent of the total roof area is replaced within any one-year period, the entire roof covering of every new structure, and any roof covering applied in the alteration, repair, or replacement of the roof of every existing structure, shall be a fire-retardant roof covering that is at least Class B.

18.03.030 Section 1512.2.1.2 is Added
Section 1512.2.1.2 is added to read as follows:

1512.2.1.2 Existing wood shingle or shake roofs. Where the application of a new roof covering is proposed over wood shingle or shake roofs, the entire existing surface roofi ng material including all layers of wood shingle or shake shall first be removed.

18.03.040 Section 1512.2.2 is Added
Section 1512.2.2 is added to read as follows:

1512.2.2 Roof replacement over spaced sheathing. Where spaced sheathing was originally installed as the supporting material, new solid sheathing shall be added prior to the installation of the new roofing material.

15.a
Packet Pg. 117
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 18 18.03.050 Section 1512.6 is Added
Section 1512.6 is added to read as follows:

1512.6 Inspections. An inspection shall be required for all reroofing installations upon removal of all existing layers of roof coverings or, where the existing roof covering is to be recovered, prior to the installation of the new roofing material. Prior to such inspection, any damage d areas of the roof deck or structural framing members shall be repaired or replaced with new material.

15.a
Packet Pg. 118
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 19 Chapter 18.04
AMENDMENTS TO CHAPTER 16; STRUCTURAL DESIGN, OF THE CALIFORNIA

BUILDING CODE

Sections:

18.04.005 Chapter 16 is Amended

18.04.010 Section 1612.3 is Amended

18.04.020 Section 1613.5 is Added

18.04.030 Section 1613.6 is Added

18.04.040 Section 1613.7 is Added

18.04.050 Section 1613.8 is Added

18.04.060 Section 1613.9 is Added

18.04.070 Section 1613.10 is Added

18.04.005 Chapter 16 is Amended
The following sections of Chapter 16 of the California Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.04.010 Section 1612.3 is Amended
Section 1612.3 is amended to read as follows:

1612.3 Basis for Establishing the Areas of Special flood hazard. The areas of special flood hazard identified by the Federal Emergency Management Agency (FEMA) in the Flood Insurance Study (FIS) for the City of Santa Clarita dated June 2, 2021, with accompanying Flood Insurance Rate Maps (FIRMs) and Flood Boundary and Floodway Maps (FBFMs) and all subsequent amendments and/or revisions and the Los Angeles County Floodway Maps dated May of 1980 through August of 1985 are hereby adopted by reference and declared to be a part of this chapter.

18.04.020 Section 1613.5 is Added
Section 1613.5 is added to read as follows:

1613.5 ASCE 7, 12.12.3. Modify ASCE 7 Equation 12.12-1 of Section 12.12.3 to read as follows:

δM = Cd δmax (Equation 12.2-1)

18.04.030 Section 1613.6 is Added
Section 1613.6 is added to read as follows:

1613.6 ASCE 7, 12.2.3.1, Exception 3. Modify ASCE 7 Section 12.2.3.1 Exception 3 to read as follows:

3. Detached one- and two-family dwellings up to two stories in height of light frame construction.

18.04.40 Section 1613.7 is Added
Section 1613.7 is added to read as follows:

1613.7 Seismic Design Provisions for Hillside Buildings.

1613.7.1 Purpose. The purpose of this section is to establish minimum regulations for the design and construction of new buildings and additions to existing buildings when constructing such buildings on or into slopes steeper than one unit vertical in three units horizontal (33.3%). These regulations

15.a
Packet Pg. 119
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 20 establish minimum standards for seismic force resistance to reduce the risk of injury or loss of life in the event of earthquakes.

1613.7.2 Scope. The provisions of this section shall apply to the design of the lateral-force-resisting system for hillside buildings at and below the base level diaphragm. The design of the lateral-force resisting system above the base level diaphragm shall be in accordance with the provisions for seismic and wind design as required elsewhere in this division.

Exception: Non-habitable accessory buildings and decks not supporting or supported from the main building are exempt from these regulations.

1613.7.3 Definitions. For the purposes of this section certain terms are defined as follows:

BASE LEVEL DIAPHRAGM is the floor at, or closest to, the top of the highest level of the foundation.

DIAPHRAGM ANCHORS are assemblies that connect a diaphragm to the adjacent foundation at the uphill diaphragm edge.

DOWNHILL DIRECTION is the descending direction of the slope approximately perpendicular to the slope contours.

FOUNDATION is concrete or masonry which supports a building, including footings, stem walls, retaining walls, and grade beams.

FOUNDATION EXTENDING IN THE DOWNHILL DIRECTION is a foundation running downhill and approximately perpendicular to the uphill foundation.

HILLSIDE BUILDING is any building or portion thereof constructed on or into a slope steeper than one unit vertical in three units horizontal (33.3%). If only a portion of the building is supported on or into the slope, these regulations apply to the entire building.

PRIMARY ANCHORS are diaphragm anchors designed for and providing a direct connection as described in Sections 1613.7.5 and 1613.7.7.3 between the diaphragm and the uphill foundation.

SECONDARY ANCHORS are diaphragm anchors designed for and providing a redundant diaphragm to foundation connection, as described in Sections 1613.7.6 and 1613.7.7.4.

UPHILL DIAPHRAGM EDGE is the edge of the diaphragm adjacent and closest to the highest ground level at the perimeter of the diaphragm.

UPHILL FOUNDATION is the foundation parallel and closest to the uphill diaphragm edge

1613.7.4 Analysis and Design.

1613.7.4.1 General. Every hillside building within the scope of this section shall be analyzed, designed, and constructed in accordance with the provisions of this division. When the code prescribed wind design produces greater effects, the wind design shall govern, but detailing requirements and limitations prescribed in this and referenced sections shall be followed.

1613.7.4.2 Base Level Diaphragm-Downhill Direction. The following provisions shall apply to the seismic analysis and design of the connections for the base level diaphragm in the downhill direction.

1613.7.4.2.1 Base for Lateral Force Design Defined. For seismic forces acting in the downhill direction, the base of the building shall be the floor at or closest to the top of the highest level of the foundation.

15.a
Packet Pg. 120
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 21 1613.7.4.2.2 Base Shear. In developing the base shear for seismic design, the response modification coefficient (R) shall not exceed 5 for bearing wall and building frame systems. The total base shear shall include the forces tributary to the base level diaphragm including forces from the base level diaphragm.

1613.7.5 Base Shear Resistance-Primary Anchors.

1613.7.5.1 General. The base shear in the downhill direction shall be resisted through primary anchors from diaphragm struts provided in the base level diaphragm to the foundation.

1613.7.5.2 Location of Primary Anchors. A primary anchor and diaphragm strut shall be provided in line with each foundation extending in the downhill direction. Primary anchors and diaphragm struts shall also be provided where interior vertical lateral-force-resisting elements occur above and in contact with the base level diaphragm. The spacing of primary anchors and diaphragm struts or collectors shall in no case exceed 30 feet (9144 mm).

1613.7.5.3 Design of Primary Anchors and Diaphragm Struts. Primary anchors and diaphragm struts shall be designed in accordance with the requirements of Section 1613.7.8.

1613.7.5.4 Limitations. The following lateral-force-resisting elements shall not be designed to resist seismic forces below the base level diaphragm in the downhill direction:

1. Wood structural panel wall sheathing,

2. Cement plaster and lath,

3. Gypsum wallboard, and

4. Tension only braced frames.

Braced frames designed in accordance with the requirements of Section 2205.2.2 may be used to transfer forces from the primary anchors and diaphragm struts to the foundation provided lateral forces do not induce flexural stresses in any member of the frame or in the diaphragm struts. Deflections of frames shall account for the variation in slope of diagonal members when the frame is not rectangular.

1613.7.6. Base Shear Resistance-Secondary Anchors.

1613.7.6.1 General. In addition to the primary anchors required by Section 1613.7.5, the base shear in the downhill direction shall be resisted through secondary anchors in the uphill foundation connected to diaphragm struts in the base level diaphragm.

Exception: Secondary anchors are not required where foundations extending in the downhill direction spaced at not more than 30 feet (9144 mm) on center extend up to and are directly connected to the base level diaphragm for at least 70% of the diaphragm depth.

1613.7.6.2 Secondary Anchor Capacity and Spacing. Secondary anchors at the base level diaphragm shall be designed for a minimum force equal to the base shear, including forces tributary to the base level diaphragm, but not less than 600 pounds per lineal foot (ASD) (8.76 kN/m). The secondary anchors shall be uniformly distributed along the uphill diaphragm edge and shall be spaced a maximum of four feet (1219 mm) on center.

1613.7.6.3 Design. Secondary anchors and diaphragm struts shall be designed in accordance with Section 1613.7.8.

1613.7.7 Diaphragms Below the Base Level-Downhill Direction. The following provisions shall apply to the lateral analysis and design of the connections for all diaphragms below the base level diaphragm in the downhill direction.

15.a
Packet Pg. 121
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 22 1613.7.7.1 Diaphragm Defined. Every floor level below the base level diaphragm shall be designed as a diaphragm.

1613.7.7.2 Design Force. Each diaphragm below the base level diaphragm shall be designed for all tributary loads at that level using a minimum seismic force factor not less than the base shear coefficient.

1613.7.7.3 Design Force Resistance-Primary Anchors. The design force described in Section 1613.7.7.2 shall be resisted through primary anchors from diaphragm struts provided in each diaphragm to the foundation. Primary anchors shall be provided and designed in accordance with the requirements and limitations of Section 1613.7.5.

1613.7.7.4 Design Force Resistance-Secondary Anchors.

1613.7.7.4.1 General. In addition to the primary anchors required in Section 1613.7.7.3, the design force in the downhill direction shall be resisted through secondary anchors in the uphill foundation connected to diaphragm struts in each diaphragm below the base level.

Exception: Secondary anchors are not required where foundations extending in the downhill direction, spaced at not more than 30 feet (9144 mm) on center, extend up to and are directly connected to each diaphragm below the base level for at least 70% of the diaphragm depth.

1613.7.7.4.2 Secondary Anchor Capacity. Secondary anchors at each diaphragm below the base level diaphragm shall be designed for a minimum force equal to the design force but not less than 300 pounds per lineal foot (ASD) (4.38 kN/m). The secondary anchors shall be uniformly distributed along the uphill diaphragm edge and shall be spaced a maximum of four feet (1219 mm) on center.

1613.7.7.4.3 Design. Secondary anchors and diaphragm struts shall be designed in accordance with Section 1613.7.8.

1613.7.8 Primary and Secondary Anchorage and Diaphragm Strut Design. Primary and secondary anchors and diaphragm struts shall be designed in accordance with the following provisions:

1. Fasteners. All bolted fasteners used to develop connections to wood members shall be provided with square plate washers at all bolt heads and nuts. Washers shall be minimum 0.229 inch by 3 inches by 3 inches (5.82 mm by 76 mm by 76 mm) in size. Nuts shall be tightened to finger tight plus one half (1/2) wrench turn prior to covering the framing.

2. Fastening. The diaphragm to foundation anchorage shall not be accomplished by the use of toe- nailing, nails subject to withdrawal, or wood in cross-grain bending or cross-grain tension.

3. Size of Wood Members. Wood diaphragm struts collectors, and other wood members connected to primary anchors shall not be less than three-inch (76 mm) nominal width. The effects of eccentricity on wood members shall be evaluated as required per Item 9.

4. Design. Primary and secondary anchorage, including diaphragm struts, splices, and collectors shall be designed for 125% of the tributary force.

5. Allowable Stress Increase. The one-third allowable stress increase permitted under Section 1605.2 shall not be taken when the working (allowable) stress design method is used.

6. Steel Element of Structural Wall Anchorage System. The strength design forces for steel elements of the structural wall anchorage system, with the exception of anchor bolts and reinforcing steel, shall be increased by 1.4 times the forces otherwise required.

15.a
Packet Pg. 122
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 23 7. Primary Anchors. The load path for primary anchors and diaphragm struts shall be fully developed into the diaphragm and into the foundation. The foundation must be shown to be adequate to resist the concentrated loads from the primary anchors.

8. Secondary Anchors. The load path for secondary anchors and diaphragm struts shall be fully developed in the diaphragm but need not be developed beyond the connection to the foundation.

9. Symmetry. All lateral force foundation anchorage and diaphragm strut connections shall be symmetrical. Eccentric connections may be permitted when demonstrated by calculation or tests that all components of force have been provided for in the structural analysis or tests.

10. Wood Ledgers. Wood ledgers shall not be used to resist cross-grain bending or cross-grain tension.

1613.7.9 Lateral-Force-Resisting Elements Normal to the Downhill Direction.

1613.7.9.1 General. In the direction normal to the downhill direction, lateral-force-resisting elements shall be designed in accordance with the requirements of this section.

1613.7.9.2 Base Shear. In developing the base shear for seismic design, the response modification coefficient (R) shall not exceed 5 for bearing wall and building frame systems.

1613.7.9.3 Vertical Distribution of Seismic Forces. For seismic forces acting normal to the downhill direction the distribution of seismic forces over the height of the building using Section

12.8.3 of ASCE 7 shall be determined using the height measured from the top of the lowest level of the building foundation.

1613.7.9.4 Drift Limitations. The story drift below the base level diaphragm shall not exceed

0.007 times the story height at strength design force level. The total drift from the base level diaphragm to the top of the foundation shall not exceed 3/4 inch (19 mm). Where the story height or the height from the base level diaphragm to the top of the foundation varies because of a stepped footing or story offset, the height shall be measured from the average height of the top of the foundation. The story drift shall not be reduced by the effect of horizontal diaphragm stiffness.

1613.7.9.5 Distribution of Lateral Forces.

1613.7.9.5.1 General. The design lateral force shall be distributed to lateral-force-resisting elements of varying heights in accordance with the stiffness of each individual element.

1613.7.9.5.2 Wood Structural Panel Sheathed Walls. The stiffness of a stepped wood structural panel shear wall may be determined by dividing the wall into adjacent rectangular elements, subject to the same top of wall deflection. Deflections of shear walls may be estimated by AF&PA SDPWS. Sheathing and fastening requirements for the stiffest section shall be used for the entire wall. Each section of wall shall be anchored for shear and uplift at each step. The minimum horizontal length of a step shall be 8 feet (2438 mm) and the maximum vertical height of a step shall be 2 feet, 8 inches (813 mm).

1613.7.9.5.3 Reinforced Concrete or Masonry Shear Walls. Reinforced concrete or masonry shear walls shall have forces distributed in proportion to the rigidity of each section of the wall.

1613.7.9.6 Limitations. The following lateral force-resisting-elements shall not be designed to resist lateral forces below the base level diaphragm in the direction normal to the downhill direction:

1. Cement plaster and lath,

2. Gypsum wallboard, and

15.a
Packet Pg. 123
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 24 3. Tension-only braced frames.

Braced frames designed in accordance with the requirements of Section 2205.2.2 of this code may be designed as lateral-force-resisting elements in the direction normal to the downhill direction, provided lateral forces do not induce flexural stresses in any member of the frame.

Deflections of frames shall account for the variation in slope of diagonal members when the frame is not rectangular.

1613.7.10 Specific Design Provisions.

1613.7.10.1 Footings and Grade Beams. All footings and grade beams shall comply with the following:

1. Grade beams shall extend at least 12 inches (305 mm) below the lowest adjacent grade and provide a minimum 24-inch (610 mm) distance horizontally from the bottom outside face of the grade beam to the face of the descending slope.

2. Continuous footings shall be reinforced with at least two No. 4 reinforcing bars at the top and two No. 4 reinforcing bars at the bottom.

3. All main footing and grade beam reinforcement steel shall be bent into the intersecting footing and fully developed around each corner and intersection.

4. All concrete stem walls shall extend from the foundation and reinforced as required for concrete or masonry walls.

1613.7.10.2 Protection against Decay and Termites. All wood to earth separations shall comply with the following:

1. Where a footing or grade beam extends across a descending slope, the stem wall, grade beam, or footing shall extend up to a minimum 18 inches (457 mm) above the highest adjacent grade.

Exception: At paved garage and doorway entrances to the building, the stem wall need only extend to the finished concrete slab, provided the wood framing is protected with a moisture proof barrier.

2. Wood ledgers supporting a vertical load of more than 100 pounds per lineal foot (ASD) (1.46 kN/m) and located within 48 inches (1219 mm) of adjacent grade are prohibited.

Galvanized steel ledgers and anchor bolts, with or without wood nailers, or treated or decay resistant sill plates supported on a concrete or masonry seat, may be used.

1613.7.10.3 Sill Plates. All sill plates and anchorage shall comply with the following:

1. All wood framed walls, including nonbearing walls, when resting on a footing, foundation, or grade beam stem wall, shall be supported on wood sill plates bearing on a level surface.

2. Power-driven fasteners shall not be used to anchor sill plates except at interior non-bearing walls not designed as shear walls.

1613.7.10.4 Column Base Plate Anchorage. The base of isolated wood posts (not framed into a stud wall) supporting a vertical load of 4,000 pounds (ASD) (17.8 kN) or more and the base plate for a steel column shall comply with the following:

1. When the post or column is supported on a pedestal extending above the top of a footing or grade beam, the pedestal shall be designed and reinforced as required for concrete or masonry columns. The pedestal shall be reinforced with a minimum of four No. 4 bars extending to the

15.a
Packet Pg. 124
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 25 bottom of the footing or grade beam. The top of exterior pedestals shall be sloped for positive drainage.

2. The base plate anchor bolts or the embedded portion of the post base, and the vertical reinforcing bars for the pedestal, shall be confined with two No. 4 or three No. 3 ties within the top five inches (127 mm) of the concrete or masonry pedestal. The base plate anchor bolts shall be embedded a minimum of 20 bolt diameters into the concrete or masonry pedestal.

The base plate anchor bolts and post bases shall be galvanized and each anchor bolt shall have at least two galvanized nuts above the base plate.

1613.7.10.5 Steel Beam to Column Supports. All steel beam to column supports shall be positively braced in each direction. Steel beams shall have stiffener plates installed on each side of the beam web at the column. The stiffener plates shall be welded to each beam flange and the beam web. Each brace connection or structural member shall consist of at least two 5/8 inch (15.9 mm) diameter machine bolts.

18.04.050 Section 1613.8 is Added
Section 1613.8 is added to read as follows:

1613.8 Suspended Ceilings. Minimum design and installation standards for suspended ceilings shall be determined in accordance with the requirements of Section 2506.2.1 of this code and this section.

1613.8.1 Scope. This part contains special requirements for suspended ceilings and lighting systems.

Provisions of Section 13.5.6 of ASCE 7 shall apply except as modified herein.

1613.8.2 General. The suspended ceilings and lighting systems shall be limited to 6 feet (1828 mm) below the structural deck unless the lateral bracing is designed by a licensed engineer or architect.

1613.8.3 Sprinkler Heads. All sprinkler heads (drops) except fire-resistance-rated floor/ceiling or roof/ceiling assemblies, shall be designed to allow for free movement of the sprinkler pipes with oversize rings, sleeves or adaptors through the ceiling tile. Sprinkler heads and other penetrations shall have a 2 in. (50mm) oversize ring, sleeve, or adapter through the ceiling tile to allow for free movement of at least 1 in. (25mm) in all horizontal directions. Alternatively, a swing joint that can accommodate 1 in. (25 mm) of ceiling movement in all horizontal directions is permitted to be provided at the top of the sprinkler head extension.

Sprinkler heads penetrating fire-resistance-rated floor/ceiling or roof/ceiling assemblies shall comply with Section 714 of this code.

1613.8.4 Lateral Bracing. Suspended ceilings with areas greater than 144 square-feet shall be laterally braced to the structure above.

18.04.060 Section 1613.9 is Added
Section 1613.9 is added to read as follows:

1613.9 Power Actuated Fasteners. The provisions of Section 13.4.5 of ASCE 7 shall apply to the design of power actuated fasteners. Power actuated fasteners shall not be used to anchor sill plates or tracks except at interior non-bearing walls not designed as shear walls.

18.04.070 Section 1613.10 is Added
Section 1613.10 is added as follows:

1613.10 Light-gage mudsill anchors. Light-gage mudsill anchors which are intended to be bent upon installation shall not be used to anchor shear walls. Where light-gage anchors are used at exterior walls

15.a
Packet Pg. 125
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 26 not designed as shear walls, they shall be fully protected by the exterior weather barrier assembly or by an approved corrosion-resistant coating.

15.a
Packet Pg. 126
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 27 Chapter 18.05
AMENDMENTS TO CHAPTER 17; STRUCTURAL TESTS AND SPECIAL

INSPECTIONS, OF THE CALIFORNIA BUILDING CODE

Sections:

18.05.005 Chapter 17 is Amended

18.05.010 Section 1705.3 is Amended

18.05.005 Chapter 17 is Amended
The following sections of Chapter 17 of the California Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.05.10 Section 1705.3 is Amended
Section 1705.3 is amended to read as follows:

1705.3 Concrete Construction. The special inspections and verifications for concrete construction shall be as required by this section and Table 1705.3.

Exceptions: Special inspection shall not be required for:

1. Isolated spread concrete footings of buildings three stories or less above grade plane that are fully supported on earth or rock, where the structural design of the footing is based on a specified compressive strength, f’c, no greater than 2,500 pounds per square inch (psi) (17.2 MPa).

2. Continuous concrete footings supporting walls of buildings three stories or less in height that are fully supported on earth or rock where:

2.1. The footings support walls of light-frame construction;

2.2. The footings are designed in accordance with Table 1809.7; or

2.3. The structural design of the footing is based on a specified compressive strength, f’c, no greater than 2,500 pounds per square inch (psi) (17.2 MPa), regardless of the compressive strength specified in the construction documents or used in the footing construction.

3. Nonstructural concrete slabs supported directly on the ground, including prestressed slabs on grade, where the effective prestress in the concrete is less than 150 psi (1.03 MPa).

4. Concrete patios, driveways and sidewalks, on grade.

15.a
Packet Pg. 127
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 28 Chapter 18.06
AMENDMENTS TO CHAPTER 18; SOILS AND FOUNDATIONS, OF THE

CALIFORNIA BUILDING CODE

Sections:

18.06.005 Chapter 18 is Amended

18.06.006 Section 1805.1 is Amended

18.06.010 Section 1807.1.4 is Amended

18.06.013 Section 1807.1.6 is Amended

18.06.015 Section 1807.2 is Amended

18.06.020 Section 1807.3.1 is Amended

18.06.030 Section 1808.7.2 is Amended

18.06.040 Section 1809.3 is Amended

18.06.050 Section 1809.4 is Amended

18.06.060 Section 1809.7 and Table 1809.7 are Amended

18.06.070 Section 1809.12 is Amended

18.06.080 Section 1810.3.2.4 is Amended

18.06.05 Chapter 18 is Amended
The following sections of Chapter 18 of the California Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.06.06 Section 1805.1 is Amended
Section 1805.1 is amended to read as follows:

1805.1 General. Walls or portions thereof that retain earth and enclose interior spaces and floors below grade shall be waterproofed and dampproofed in accordance with this section, with the exception of those spaces containing groups other than residential and institutional where such omission is not detrimental to the building or occupancy. Ventilation for crawl spaces shall comply with Section 1202.5. Walls retaining 8 feet of soil or more shall have a waterproofing membrane installed in accordance with Section 1805.3.2. Where the geotechnical engineer determines that a waterproofing membrane is not required to protect against corrosion of reinforcing steel, a waterproofing membrane shall not be required.

18.06.010 Section 1807.1.4 is Amended
Section 1807.1.4 is amended to read as follows:

1807.1.4 Permanent wood foundation systems. Permanent wood foundation systems shall not be permitted.

18.06.013 Section 1807.1.6 is Amended
Section 1807.1.6 is amended to read as follows:

1807.1.6 Prescriptive design of concrete and masonry foundation walls. Concrete and masonry foundation walls that are laterally supported at the top and bottom shall be permitted to be designed and constructed in accordance with this section. Prescriptive design of foundation walls shall not be used for structures assigned to Seismic Design Category D, E or F.

18.06.015 Section 1807.2 is Amended
Section 1807.2 is amended to read as follows:

15.a
Packet Pg. 128
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 29 1807.2 Retaining walls. Retaining walls shall be designed in accordance with Section 1807.2.1 through 1807.2.4. Retaining walls assigned to Seismic Design Category D, E or F shall not be constructed of wood.

18.06.20 Section 1807.3.1 is Amended
Section 1807.3.1 is amended to read as follows:

1807.3.1 Limitations. The design procedures outlined in this section are subject to the following limitations:

1. The frictional resistance for structural walls and slabs on silts and clays shall be limited to one-half of the normal force imposed on the soils by the weight of the fooling or slab.

2. Posts embedded in earth shall not be used to provide lateral support for structural or nonstructural materials such as plaster, masonry or concrete unless bracing is provided that develops the limited deflection required.

Wood poles shall be treated in accordance with AWPA U1 for sawn timber posts (Commodity Specification A, Use Category 4B) and for round timber posts (Commodity Specification B, Use Category 4B). Wood poles and posts embedded in direct contact with soil shall not be used for structures assigned to Seismic Design Category D, E or F.

Exception: Wood poles and posts embedded in direct contact with soil may be used to support non- habitable, non-occupiable structures such as fences when approved by the Building Official.

18.06.030 Section 1808.7.2 is Amended
Section 1808.7.2 is amended to read as follows:

1808.7.2 Foundation setback from descending slope surface. Foundations on or adjacent to slope surfaces shall be founded in firm material with an embedment and set back from the slope surface sufficient to provide vertical and lateral support for the foundation without detrimental settlement. Except as provided for in Section 1808.7.5 and Figure 1808.7.1, the following setback is deemed adequate to meet the criteria. Where the slope is steeper than 1 unit vertical in 1 unit horizontal (100-percent slope), the required setback shall be measured from an imaginary plane 45 degrees (0.79 rad) to the horizontal, projected upward from the toe of the slope. The setback shall be that determined using Figure 1808.7.1 or 5 feet, whichever is larger.

18.06.040 Section 1809.3 is Amended
Section 1809.3 is amended to read as follows:

1809.3 Stepped footings. The top surface of footings shall be level. The bottom surface of footings shall be permitted to have a slope not exceeding one unit vertical in 10 units horizontal (10-percent slope). Footings shall be stepped where it is necessary to change the elevation of the top surface of the footing or where the surface of the ground slopes more than one unit vertical in 10 units horizontal (10-percent slope).

For structures assigned to Seismic Design Category D, E or F, the stepping requirement shall also apply to the top surface of grade beams supporting walls. Footings shall be reinforced with a minimum of four #4 steel reinforcing bars. Two bars shall be place at the top and bottom of the footings as shown in Figure 1809.3.

15.a
Packet Pg. 129
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 30 Figure 1809.3

18.06.050 Section 1809.4 is Amended
Section 1809.4 is amended to read as follows:

1809.4 Depth and width of footings. Where a geotechnical report is not provided and the presence of expansive soils is unknown, the minimum depth of footings shall be 24 inches (610 mm) for exterior walls and 18 inches (458 mm) for interior bearing walls. Such footings shall be reinforced with a minimum of two #4 rebar at the top and two #4 rebar at the bottom.

Exception: The minimum footing depth for unoccupied group U structures or patio structures associated with an R-3 occupancy shall be 12 inches (305 mm).

Otherwise, the minimum depth of footings below the undisturbed ground surface shall be 12 inches (305 mm). Where applicable, the requirements of section 1809.5 shall also be satisfied. The minimum width of footings shall be 12 inches (305 mm).

18.06.060 Section 1809.7 and Table 1809.7 are Amended
Section 1809.7 and Table 1809.7 are amended to read as follows:

1809.7 Prescriptive footings for light-frame construction. Where a specific design is not provided, concrete or masonry-unit footings supporting walls of light-frame construction shall be permitted to be designed in accordance with Table 1809.7. Prescriptive footings in Table 1809.7 shall not exceed two stories above grade plane for structures assigned to Seismic Design Category D, E or F.

TABLE 1809.7

PRESCRIPTIVE FOOTINGS SUPPORTING WALLS OF
LIGHT-FRAME CONSTRUCTION a, b, c, d, e

NUMBER OF FLOORS

SUPPORTED BY THE

FOOTING

WIDTH OF FOOTING
(inches)

THICKNESS OF
FOOTING (inches)
1 12 8
2 15 8
For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm
a. Depth of footings shall be in accordance with Section 1809.4. b. The ground under the floor shall be permitted to be excavated to the elevation of the top of the footing.
c. See Section 1905 for additional requirements for concrete footings of structures assigned to Seismic Design Category C, D, E or F.

15.a
Packet Pg. 130
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 31 d. For thickness of foundation walls, see Section 1807.1.6. e. Footings shall be permitted to support a roof addition to the stipulated number of floors. Footings supporting roof only shall be as required for supporting one floor.

18.06.070 Section 1809.12 is Amended
Section 1809.12 is amended to read as follows:

1809.12 Timber footings. Timber footings shall not be permitted.

18.06.080 Section 1810.3.2.4 is Amended
Section 1810.3.2.4 is amended to read as follows:

1810.3.2.4 Timber. Timber deep foundation elements shall not be permitted.

15.a
Packet Pg. 131
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 32 Chapter 18.07
AMENDMENTS TO CHAPTER 19; CONCRETE, OF THE CALIFORNIA BUILDING CODE

Sections:

18.07.005 Chapter 19 is Amended

18.07.010 Section 1905.1.7 is Amended

18.07.005 Chapter 19 is Amended
The following sections of Chapter 19 of the California Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.07.010 Section 1905.1.7 is Amended
Section 1905.1.7 is amended to read as follows:

1905.1.7 ACI 318, Section 14.1.4. Delete ACI 318, Section 14.1.4, and replace with the following:

14.1.4 – Plain concrete in structures assigned to Seismic Design Category C, D, E or F.

14.1.4.1 – Structures assigned to Seismic Design Category C, D, E or F shall not have elements of structural plain concrete, except as follows:

(a) Concrete used for fill with a minimum cement content of two (2) sacks of Portland cement per cubic yard.

(b) Isolated footings of plain concrete supporting pedestals or columns are permitted for buildings of light-frame construction, provided the projection of the footing beyond the face of the supported member does not exceed the footing thickness and the footing supports a single roof or floor.

(c) Plain concrete footings supporting walls are permitted provided the footings have at least two continuous longitudinal reinforcing bars. Bars shall not be smaller than No. 4 and shall have a total area of not less than 0.002 times the gross cross-sectional area of the footing. A minimum of one bar shall be provided at the top and bottom of the footing. Continuity of reinforcement shall be provided at corners and intersections.

In detached one- and two-family dwellings three stories or less in height and constructed with stud-bearing walls, plain concrete footings with at least two continuous longitudinal reinforcing bars not smaller than No. 4 are permitted to have a total area of less than 0.002 times the gross cross-sectional area of the footing.

15.a
Packet Pg. 132
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 33 Chapter 18.08
AMENDMENTS TO CHAPTER 23; WOOD, OF THE CALIFORNIA BUILDING CODE

Sections:

18.08.005 Chapter 23 is Amended

18.08.010 Section 2304.10.2 is Amended

18.08.011 Section 2304.10.3.1 is Added

18.08.020 Section 2304.10.8 is Amended

18.08.030 Section 2304.10.9 is Added

18.08.040 Section 2304.12.2.8 is Amended

18.08.050 Section 2305.1.3 is Added

18.08.060 Section 2306.2 is Amended

18.08.070 Tables 2306.2(3), 2306.2(4), and 2306.2(5) are Added

18.08.080 Section 2306.3 is Amended

18.08.090 Section 2307.2 is Added

18.08.100 Table 2306.3(4) is Added

18.08.110 Table 2308.6.1 is Amended

18.08.120 Section 2308.6.5 is Amended

18.08.130 Section 2308.6.8.1 is Amended

18.08.140 Section 2308.6.9 is Amended

18.08.005 Chapter 23 is Amended
The following sections of Chapter 23 of the California Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.08.10 Section 2304.10.2 is Amended
Section 2304.10.2 is amended to read as follows:

2304.10.2 Fastener requirements. Connections for wood members shall be designed in accordance with the appropriate methodology in Section 2302.1. The number and size of fasteners connecting wood members shall not be less than that set forth in Table 2304.10.2. Staple fasteners in Table 2304.10.2 shall not be used to resist or transfer seismic forces in structures assigned to Seismic Design Category D, E or F.

Exception: Staples may be used to resist or transfer seismic forces when the allowable shear values are substantiated by cyclic testing and approved by the Building Official.

18.08.11 Section 2304.10.3.1 is Added
Section 2304.10.3.1 is added to read as follows:

2304.10.3.1 Quality of Nails. Mechanically driven nails used in wood structural panel shear walls shall meet the same dimensions as that required for hand-driven nails, including diameter, minimum length and minimum head diameter. Clipped head or box nails are not permitted in new construction. The allowable design value for clipped head nails in existing construction may be taken at no more than the nail-head- area ratio of that of the same size hand-driven nails.

18.08.020 Section 2304.10.8 is Amended
Section 2304.10.8 is amended to read as follows:

2304.10.8 Framing requirements. Wood columns and posts shall be framed to provide full end bearing.

Alternatively, column-and-post end connections shall be designed to resist the full compressive loads, neglecting end-bearing capacity. Column-and-post end connections shall be fastened to resist lateral and

15.a
Packet Pg. 133
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 34 net induced uplift forces. The minimum lateral design force for column and post end connections shall be 2% of the total axial compressive force acting on the column or post, but shall not be less than the force determined by analysis. The minimum lateral design force shall be assumed to act in any direction.

18.08.030 Section 2304.10.9 is Added
Section 2304.10.9 is added to read as follows:

2304.10.9 Nails, staples, or spikes in withdrawal. Nails, staples, or spikes shall not be used in withdrawal to resist the loads prescribed by this code.

Exceptions:

1. Fasteners connecting finish materials weighing 10 psf or less.

2. Fasteners connecting sheathing may be used to resist wind uplift loads.

3. Fasteners connecting roofing or cladding, when specifically approved by this code or by an approved listing or testing authority.

4. Fasteners connecting mechanical or electrical components weighing 20 lb or less, or in the case of a distributed system, 5 lb/ft or less.

18.08.040 Section 2304.12.2.8 is Amended
Section 2304.12.2.8 is amended to read as follows:

2304.12.2.8 Wood used in retaining walls and cribs. Wood installed in retaining or crib walls shall be preservative treated in accordance with AWPA U1 for soil and fresh water use. Wood shall not be used in retaining or crib walls for structures assigned to Seismic Design Category D, E, or F.

18.08.050 Section 2305.1.3 is Added
Section 2305.1.3 is added to read as follows:

2305.1.3 Lateral Design Standard. The American Wood Council’s (AWC) design standard Special Design Provisions for Wind and Seismic (SDPWS) may also be referred to as Special Provisions for the Design of Wind and Seismic (SPDWS).

18.08.60 Section 2306.2 is Amended
Section 2306.2 is amended to read as follows:

2306.2 Wood-frame diaphragms. Wood-frame diaphragms shall be designed and constructed in accordance with AWC SDPWS. Where panels are fastened to framing members with staples, requirements and limitations of AWC SDPWS shall be met and the allowable shear values set forth in Table 2306.2(1) or 2306.2(2) shall only be permitted for structures assigned to Seismic Design Category A, B, or C.

Exception: Allowable shear values where panels are fastened to framing members with staples may be used if such values are substantiated by cyclic testing and approved by the Building Official.

The allowable shear values in Tables 2306.2(1) and 2306.2(2) are permitted to be increased 40 percent for wind design.

Wood structural panel diaphragms used to resist seismic forces in structures assigned to Seismic Design Category D, E or F shall be applied directly to the framing members.

Exception: Wood structural panel diaphragms are permitted to be fastened over solid lumber planking or laminated decking, provided the panel joints and lumber planking or laminated decking joints do not coincide.

15.a
Packet Pg. 134
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 35 18.08.070 Tables 2306.2(3), 2306.2(4), and 2306.2(5) are Added Tables 2306.2(3), 2306.2(4), and 2306.2(5) are added as follows:

15.a
Packet Pg. 135
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 36 Table 2306.2(3)
UNBLOCKED Wood Structural Panel DIAPHRAGMS with Framing of Douglas-Fir Larch or Southern Pine Allowable (ASD) Unit Shear Capacities (pounds per foot)

Sheathing
Grade

Common
Nail Size
Minimum
Nail
Bearing
Length in
Framing
Member
(in.)

Minimum
Nominal
Panel
Thickness
(in.)
Minimum
Nominal Width of
Nailed Face at
Adjoining Panel
Edges and
Boundaries (in.)

SEISMIC WIND
6 in. Nail Spacing at diaphragm
boundaries and supported panel
edges
6 in. Nail Spacing at diaphragm
boundaries and supported panel
edges

Case 1

Cases 2,3,4,5,6

Case 1

Cases 2,3,4,5,6

Structural I
8d 1-3/8 3/8 2
3 240
265
180
200
335
370
252
280
10d 1-1/2 15/32 2
3 285
320
215
240
400
447
300
335

Sheathing and
Single-Floor
(DOC PS1 and
PS2)
6d 1-1/4 3/8 2
3 165
185
125
140
230
260
175
195

8d

1-3/8
3/8 2
3 215
240
160
180
300
335
225
252
7/16 2
3 230
255
170
190
322
357
237
265
15/32 2
3 240
265
180
200
335
370
252
280

10d

1-1/2
15/32 2
3 255
290
190
215
357
405
265
300
19/32 2
3 285
320
215
240
400
447
300
335
a. See AWC SDPWS for the following: For general construction requirements see 4.2.7. For specific requirements see 4.2.8.1 for wood structural panel diaphragms. See Appendix A for common nail dimensions.
b. For species and grades of framing other than Douglas-Fir-Larch or Southern Pine, reduced nominal unit shear capacities shall be determined by multiplying the tabulated nominal unit shear capacity by the Specific Gravity Adjustment Factor = [1 -(0.5-G)], where G = Specific Gravity of the framing lumber from the NDS (Table 12.3.3A). The Specific Gravity Adjustment Factor shall not be greater than 1. c. See AWC SDPWS Table 4.2C for Case definitions.
d. See AWC SDPWS Table 4.2C for the apparent shear stiffness values (Ga). e. Tabulated nominal unit shear capacities are applicable for carbon steel smooth shank nails of the specified type and size.

15.a
Packet Pg. 136
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 37 Table 2306.2(4)
BLOCKED Wood Structural Panel DIAPHRAGMS with Framing of Douglas-Fir Larch or Southern Pine Allowable (ASD) Unit Shear Capacities (pounds per foot)

Sheathing
Grade

Common
Nail Size
Minimum
Nail
Bearing
Length in
Framing
Member or
Blocking
(in.)

Minimum
Nominal
Panel
Thickness
(in.)

Minimum
Nominal Width
of Nailed Face
at Adjoining
Panel Edges
and Boundaries
(in.)

SEISMIC WIND
Nail Spacing (in.) at diaphragm
boundaries (all cases), at continuous
panel edges parallel to load (Cases 3 &
4), and at all panel edges (Cases 5 & 6)
Nail Spacing (in.) at diaphragm
boundaries (all cases), at continuous
panel edges parallel to load (Cases 3 &
4), and at all panel edges (Cases 5 & 6)
6 4 2-1/2 2 6 4 2-1/2 2
Nail Spacing (in.) at other panel edges
(Cases 1, 2, 3, & 4)
Nail Spacing (in.) at other panel edges
(Cases 1, 2, 3, & 4)
6 6 4 3 6 6 4 3

Structural I
8d 1-3/8 3/8 2
3 270
300
360
400
530
600
600
675
377
420
505
560
742
840
840
945
10d 1-1/2 15/32 2
3 320
360
425
480
640
720
730
820
447
505
595
672
895
1007
1022
1147

Sheathing
and Single -
Floor (DOC
PS1 and PS2)
6d 1-1/4 3/8 2
3 185
210
250
280
375
420
420
475
260
295
350
392
525
587
587
665

8d

1-3/8
3/8 2
3 240
270
320
360
480
540
545
610
335
377
447
505
672
755
762
855
7/16 2
3 255
285
340
380
505
570
575
645
357
400
475
532
707
797
805
902
15/32 2
3 270
300
360
400
530
600
600
675
377
420
505
560
742
840
840
945

10d

1-1/2
15/32 2
3 290
325
385
430
575
650
655
735
405
455
540
602
805
910
917
1030
19/32 2
3 320
360
425
480
640
720
730
820
447
505
595
672
895
1007
1022
1147
a. See AWC SDPWS for the following: For general construction requirements see 4.2.7. For specific requirements see 4.2.8.1 for wood structural panel diaphragms. See Appendix A for common nail dimensions.
b. For species and grades of framing other than Douglas -Fir-Larch or Southern Pine, reduced nominal unit shear capacities shall be determined by multiplying the tabulated nominal unit shear capacity by the Specific Gravity Adjustment Factor = [1 -(0.5-G)], where G = Specific Gravity of the framing lumber from the NDS (Table 12.3.3A). The Specific Gravity Adjustment Factor shall not be greater than 1. c. See AWC SDPWS Table 4.2A for Case definitions.
d. See AWC SDPWS Table 4.2A for the apparent shear stiffness values (Ga). e. Tabulated nominal unit shear capacities are applicable for carbon steel smooth shank nails of the specified type and size.

15.a
Packet Pg. 137
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 38 Table 2306.2(5)
Blocked Wood Structural Panel DIAPHRAGMS with Framing of Douglas-Fir Larch or Southern Pine

UTILIZING MULTIPLE ROWS OF FASTENERS (HIGH-LOAD DIAPHRAGMS) Allowable (ASD) Unit Shear Capacities (pounds per foot)

Sheathing
Grade

Common
Nail Size

Minimum
Nail Bearing
Length in
Framing
Member or
Blocking
(in.)

Minimum
Nominal
Panel
Thickness
(in.)
Minimum
Nominal
Width of
Nailed Face
at Adjoining
Panel Edges
and
Boundaries
(in.)

Lines of
Nails

SEISMIC WIND
Nail Spacing (in.) at diaphragm
boundaries (all cases), at continuous
panel edges parallel to load (Cases 3 &
4), and at all panel edges (Cases 5 & 6)
Nail Spacing (in.) at diaphragm
boundaries (all cases), at continuous
panel edges parallel to load (Cases 3 &
4), and at all panel edges (Cases 5 & 6)
4 2-1/2 4 2-1/2
Nail Spacing (in.) at other panel edges
(Cases 1, 2, 3, & 4)
Nail Spacing (in.) at other panel edges
(Cases 1, 2, 3, & 4)
6 4 4 3 6 4 4 3

Structural I

10d

1-1/2

15/32
3 4
4 2
2 3
605
700
875
815
915
1220
875
1005
1285
1150
1290
1395
847
980
1225
1140
1280
1707
1225
1407
1800
1610
1805
1952

19/32
3 4
4 2
2 3
670
780
965
880
990
1320
965
1110
1405
1255
1440
1790
937
1092
1350
1232
1385
1847
1350
1555
1967
1757
2015
2505

23/32
3 4
4 2
2 3
730
855
1050
955
1070
1430
1050
1210
1525
1365
1565
1800
1022
1197
1470
1337
1497
2002
1470
1695
2135
1910
2190
2520

Sheathing
and Single-
Floor
(DOC PS1
and PS2)

10d

1-1/2

15/32
3 4
4 2
2 3
525
605
765
725
815
1085
765
875
1130
1010
1105
1195
735
847
1070
1015
1140
1520
1070
1225
1582
1415
1547
1672

19/32
3 4
4 2
2 3
650
755
935
860
965
1290
935
1080
1365
1225
1370
1485
910
1057
1310
1205
1350
1805
1310
1512
1910
1715
1917
2080

23/32
3 4
4 2
2 3
710
825
1020
935
1050
1400
1020
1175
1480
1335
1445
1565
995
1155
1427
1310
1470
1960
1427
1645
2072
1870
2022
2190
a. See AWC SDPWS for the following: For general construction requirements see 4.2.7. For specific requirements see 4.2.8.1 for wood structural panel diaphragms. See Figure 4C for nailing diagrams. See Appendix A for common nail dimensions. b. For species and grades of framing other than Douglas-Fir-Larch or Southern Pine, reduced nominal unit shear capacities shall be determined by multiplying th e tabulated nominal unit shear capacity by the Specific Gravity Adjustment Factor = [1 -(0.5-G)], where G = Specific Gravity of the framing lumber from the NDS (Table 12.3.3A). The Specific Gravity Adjustment Factor shall not be greater than 1. c. See AWC SDPWS Table 4.2B for Case definitions.
d. See AWC SDPWS Table 4.2B for the apparent shear stiffness values (Ga). e. Tabulated nominal unit shear capacities are applicable for carbon steel smooth shank nails of the specified type and size.

15.a
Packet Pg. 138
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022

18.08.80 Section 2306.3 is Amended
Section 2306.3 is amended to read as follows:

2306.3 Wood-frame shear walls. Wood-frame shear walls shall be designed and constructed in accordance with AWC SDPWS. Where Allowable Stress Design is used, Table 2306.3(4) may be applied. Application of Table

4.3A of AWC SDPWS shall include the following:

1. Wood structural panel thickness for shear walls shall not be less than 3/8 inch thick. When 3/8-inch or 7/16- inch thick panels are used, studs shall not be spaced at more than 16 inches on center.

2. The maximum unit shear capacities for 3/8 inch wood structural panels resisting seismic forces shall be 200 pounds per linear foot (plf) using ASD or 280 plf using LRFD.

Exception: Other nominal unit shear capacities may be permitted if such values are substantiated by cyclic testing and approved by the Building Official.

3. Nails shall be placed not less than 1/2 inch in from the panel edges and not less than 3/8 inch from the edge of the connecting members for shear greater than 350 plf using ASD or 490 plf using LRFD. Nails shall be placed not less than 3/8 inch from panel edges and not less than 1/4 inch from the edge of the connecting members for shears of 350 plf or less using ASD or 490 plf or less using LRFD.

2306.3.1 Application of Table 4.3B of AWC SDPWS shall not be permitted.

2306.3.2 See section 2505.4 as amended for provisions regarding gypsum board and portland cement plaster shear walls.

2306.3.3 Shear walls using panels fastened with staples shall not be permitted.

Exception: Allowable shear values where panels are fastened to framing members with staples may be used if such values are substantiated by cyclic testing and approved by the Building Official.

2306.3.4 The allowable shear values in Tables 2306.3(1) and 2306.3(2) are permitted to be increased 40 percent for wind design. Panels complying with ANSI/APA PRP-210 shall be permitted to use design values for Plywood Siding in the AWC SDPWS.

18.08.090 Section 2307.2 is Added
Section 2307.2 is added to read as follows:

2307.2 Wood-frame shear walls. Wood-frame shear walls shall be designed and constructed in accordance with Section 2306.3 as applicable.

18.08.100 Table 2306.3(4) is Added
Table 2306.3(4) is added as follows:

39 15.a
Packet Pg. 139
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE)

TABLE 2306.3(4)
WOOD STRUCTURAL PANEL SHEAR WALLS with Framing of Douglas-Fir Larch or Southern Pine Allowable (ASD) Shear Capacities (pounds per foot)

Sheathing Material
Minimum
Nominal
Panel
Thickness
(in.)
Minimum Nail
Bearing Length
in Framing
Member or
Blocking
(in.)

Nail Size
(common)

SEISMIC WIND
Panel Edge Nail Spacing (in.) Panel Edge Nail Spacing (in.) 6 4 3 2 6 4 3 2

Wood Structural Panels
– Structural I
3/8
7/16
15/32

1-3/8

8d
200
255
280
200
395*
430*
200
505*
550*
200*
670*
730*
322
357
392
505
552
602
645
707
770
855*
937*
1022*
15/32 1-1/2 10d 340 510* 665* 870* 475 715 930* 1217*

Wood Structural Panels
– Sheathing
(DOC PS 1 or PS 2)
3/8 1-1/4 6d 200 200 200 200* 280 420 545 715*
3/8
7/16
15/32

1-3/8
8d
200
240
260
200
350
380*
200
450*
490*
200*
585*
640*
307
335
365
447
490
532
575
630
685
742*
820*
895*
15/32
19/32 1-1/2 10d 310
340
460*
510*
600*
665*
770*
870*
435
475
645
715
840*
930*
1077*
1217*
Plywood Siding 3/8 1-3/8 8d 160 200 200 200* 225 335 435 575*

* Framing members and blocking at adjoining panel edges shall be 3” nominal or greater per AWC SDPWS Section 4.3.7.1, item 5. a. Where panels are applied on both faces of a wall and nail spacing is less than 6” on center on either side, panel joints shall be offset to fall on different framing members, or framing shall be 3” nominal or thicker at adjoining panel edges and nails at all panel edges shall be staggered. b. Where the width of framing members is required to be 3” nominal, two 2” nominal members shall be permitted provided they are fastened together to transfer the shear between members.
c. Where 3/8” or 7/16” sheathing is used, studs shall not be spaced more than 16” on center. Otherwise, studs shall not be spaced at more than 24” on center. d. Where studs are spaced at 24” on center, nailing to intermediate framing shall be spaced at 6” on center maximum. Where studs are spaced less than 24” on center, nailing to intermediate framing shall be spaced at 12” on center maximum. e. Steel plate washers shall be provided at foundation anchor bolts as required by AWC SDPWS Section 4.3.6.4.3. When required, plate washers shall not be less than 0.229"x3"x3" in size. The hole in the plate washer shall be permitted to be diagonally slotted with a width of up to 3/16" larger than the bolt diameter and a slot length not to exceed 1-3/4", provided a standard cut washer is placed between the plate washer and the nut. f. Allowable shear values for 7/16” sheathing are permitted to be increased to values shown for 15/32” sheathing with the same nailing provided panels are applied with long dimension across studs.
g. Galvanized nails shall be hot dipped or mechanically deposited. h. Nails shall be placed not less than 1/2” in from panel edges and not less than 3/8” from the edge of the connecting members for shears greater than 350 plf. Nails shall not be placed not less than 3/8” from panel edges and not less than 1/4” from the edge of the connecting members for shears of 350 plf or less. i. See AWC SDPWS for the following: For general construction requirements see 4.3.6. For specific requirements for wood structural panel shearwalls see 4.3.7.1. For shear wall aspect ratios and capacity adjustments see 4.3.3. For the apparent shear stiffness values (G a), see Table 4.3A. See Appendix A for common nail dimensions. j. For species and grades of framing other than Douglas-Fir-Larch or Southern Pine, reduced nominal unit shear capacities shall be determined by multiplying the tabulated nominal unit shear capacity by the Specific Gravity Adjustment Factor = [1-(0.5-G)], where G = Specific Gravity of the framing lumber from the NDS (Table 12.3.3A). The Specific Gravity Adjustment Factor shall not be greater than 1.
k. See AWC SDPWS Table 4.3A for additional notes.

40 15.a
Packet Pg. 140
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 41 18.08.110 Table 2308.6.1 is Amended
Table 2308.6.1 is amended as follows:

15.a
Packet Pg. 141
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 42 18.08.120 Section 2308.6.5 is Amended
Section 2308.6.5 is amended as follows:

2308.6.5 Alternative bracing. An alternate braced wall (ABW) or a portal frame with hold- downs (PFH) described in this section is permitted to substitute for a 48-inch (1219 mm) braced wall panel of Method DWB, WSP, SFB, PBS, PCP or HPS. For Method GB, each 96-inch (2438 mm) section (applied to one face) or 48-inch (1219 mm) section (applied to both faces) or portion thereof required by Table 2308.6.1 is permitted to be replaced by one panel constructed in accordance with Method ABW or PFH.

2308.6.5.1 Alternate braced wall (ABW). An ABW shall be constructed in accordance with this section and Figure 2308.6.5.1. In one-story buildings, each panel shall have a length of not less than 2 feet 8 inches (813 mm) and a height of not more than 10 feet (3048 mm). Each panel shall be sheathed on one face with 3/8-inch (3.2 mm) minimum-thickness wood structural panel sheathing nailed with 8d common nails in accordance with Table 2304.10.2 and blocked at wood structural panel edges. For structures assigned to Seismic Design Category D or E, each panel shall be sheathed on one face with 15/32-inch-minimum-thickness (11.9 mm) wood structural panel sheathing nailed with 8d common nails spaced 3 inches on panel edges, 3 inches at intermediate supports. Two anchor bolts installed in accordance with Section 2308.3.1 shall be provided in each panel. Anchor bolts shall be placed at each panel outside quarter points. Each panel end stud shall have a hold-down device fastened to the foundation, capable of providing an approved uplift capacity of not less than 1,800 pounds (8006 N). The hold-down device shall be installed in accordance with the manufacturer’s recommendations. The ABW shall be supported directly on a foundation or on floor framing supported directly on a foundation that is continuous across the entire length of the braced wall line. This foundation shall be reinforced with not less than one No. 4 bar top and bottom. Where the continuous foundation is required to have a depth greater than 12 inches (305 mm), a minimum 12-inch by 12-inch (305 mm by 305 mm) continuous footing or turned-down slab edge is permitted at door openings in the braced wall line.

This continuous footing or turned-down slab edge shall be reinforced with not less than one No. 4 bar top and bottom. This reinforcement shall be lapped 24 inches (610 mm) with the reinforcement required in the continuous foundation located directly under the braced wall line.

Where the ABW is installed at the first story of two-story buildings, the wood structural panel sheathing shall be provided on both faces, three anchor bolts shall be placed at one-quarter points and tie-down device uplift capacity shall be not less than 3,000 pounds (13 344 N).

15.a
Packet Pg. 142
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 43 2308.6.5.2 Portal frame with hold-downs (PFH). A PFH shall be constructed in accordance with this section and Figure 2308.6.5.2. The adjacent door or window opening shall have a full-length header.

In one-story buildings, each panel shall have a length of not less than 16 inches (406 mm) and a height of not more than 10 feet (3048 mm). Each panel shall be sheathed on one face with a single layer of 3/8-inch (9.5 mm) minimum-thickness wood structural panel sheathing nailed with 8d common nails in accordance with Figure 2308.6.5.2. For structures assigned to Seismic Design Category D or E, each panel shall be sheathed on one face with 15/32-inch-minimum-thickness (11.9 mm) wood structural panel sheathing nailed with 8d common nails spaced 3 inches on panel edges, 3 inches at intermediate supports and in accordance with Figure 2308.6.5.2. The wood structural panel sheathing shall extend up over the solid sawn or glued-laminated header and shall be nailed in accordance with Figure 2308.6.5.2. A built-up header consisting of at least two 2-inch by 12-inch (51 mm by 305 mm) boards, fastened in accordance with Item 24 of Table 2304.10.2 shall be permitted to be used. A spacer, if used, shall be placed on the side of the built-up beam opposite the wood structural panel sheathing. The header shall extend between the inside faces of the first full-length outer studs of each panel. The clear span of the header between the inner studs of each panel shall be not less than 6 feet (1829 mm) and not more than 18 feet (5486 mm) in length. A strap with an uplift capacity of not less than 1,000 pounds (4,400 N) shall fasten the header to the inner studs opposite the sheathing. One anchor bolt not less than 5/8 inch (15.9 mm) diameter and installed in accordance with Section 2308.3.1 shall be provided in the center of each sill plate. The studs at each end of the panel shall have a hold-down device fastened to the foundation with an uplift capacity of not less than 3,500 pounds (15 570 N).

Where a panel is located on one side of the opening, the header shall extend between the inside face of the first full-length stud of the panel and the bearing studs at the other end of the opening. A strap with an uplift capacity of not less than 1,000 pounds (4400 N) shall fasten the header to the bearing studs. The bearing studs shall also have a hold-down device fastened to the foundation with an uplift capacity of not less than 1,000 pounds (4400 N). The hold-down devices shall be an embedded strap type, installed in accordance with the manufacturer’s recommendations. The PFH panels shall be supported directly on a foundation that is continuous across the entire length of the braced wall line. This foundation shall be reinforced with not less than one No. 4 bar top and bottom. Where the continuous foundation is required to have a depth greater than 12 inches (305 mm), a minimum 12-inch by 12-inch (305 mm by 305 mm) continuous footing or turned-down slab edge is permitted at door openings in the braced wall line. This continuous footing or turned-down slab edge shall be reinforced with not less than one No. 4 bar top and bottom. This reinforcement shall be lapped not less than 24 inches (610 mm) with the reinforcement required in the continuous foundation located directly under the braced wall line.

Where a PFH is installed at the first story of two-story buildings, each panel shall have a length of not less than 24 inches (610 mm).

15.a
Packet Pg. 143
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 44 18.08.130 Section 2308.6.8.1 is Amended
Section 2308.6.8.1 is amended to read as follows:

2308.6.8.1 Foundation requirements. Braced wall lines shall be supported by continuous foundations. Exterior braced wall panels shall be in the same plane vertically with the foundation or the portion of the structure containing the offset shall be designed in accordance with accepted engineering practice and Section 2308.1.1.

18.08.140 Section 2308.6.9 is Amended
Section 2308.6.9 is amended to read as follows:

2308.6.9 Attachment of sheathing. Fastening of braced wall panel sheathing shall not be less than that prescribed in Table 2308.6.1 or 2304.10.2. Wall sheathing shall not be attached to framing members by adhesives. Staple fasteners in Table 2304.10.2 shall not be used to resist or transfer seismic forces in structures assigned to Seismic Design Category D, E or F.

Exception: Staples may be used to resist or transfer seismic forces when the allowable shear values are substantiated by cyclic testing and approved by the building official.

All braced wall panels shall extend to the roof sheathing and shall be attached to parallel roof rafters or blocking above with framing clips (18 gauge minimum) spaced at maximum 24 inches (6096 mm) on center with four 8d nails per leg (total eight 8d nails per clip). Braced wall panels shall be laterally braced at each top corner and at maximum 24 inches (6096 mm) intervals along the top plate of discontinuous vertical framing.

15.a
Packet Pg. 144
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 45 Chapter 18.09
AMENDMENTS TO CHAPTER 25; GYPSUM BOARD AND PLASTER, OF THE

CALIFORNIA BUILDING CODE

Sections:

18.09.005 Chapter 25 is Amended

18.09.010 Section 2505.4 is Added

18.09.020 Section 2512.1.2.1 is Added

18.09.005 Chapter 25 is Amended
The following sections of Chapter 25 of the California Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.09.010 Section 2505.4 is Added
Section 2505.4 is added to read as follows:

2505.4 Shear walls sheathed with gypsum board, gypsum panel products, or lath and plaster shall not be permitted as part of the primary lateral force resisting system of a building structure.

Exception: Shear walls sheathed with gypsum board or lath and plaster shall be permitted for conventional wood-framed structures subject to the limitations of Section 2308, as amended.

18.09.20 Section 2512.1.2.1 is Added
Section 2512.1.2.1 is added to read as follows:

2512.1.2.1 Weather-resistive barrier at offset weep screeds. Where the vertical flange of the weep screed does not align with the foundation, the gap between the weep screed and the foundation shall be protected by a continuous weather-resistive barrier that conforms to one of the following:

1. The gap between the weep screed and the foundation shall be sealed with a material approved by the Authority Having Jurisdiction; or

2. The base of the weep screed shall extend back to the foundation; or

3. Additional corrosion-resistant flashing shall be provided.

15.a
Packet Pg. 145
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 46 Chapter 18.10
AMENDMENTS TO APPENDIX G; FLOOD-RESISTANT CONSTRUCTION, OF THE

CALIFORNIA BUILDING CODE

Sections:

18.10.005 Appendix G is Amended

18.10.010 Section G101.4 is Amended

18.10.015 Section G101.5 is Amended

18.10.020 Section G103.2 is Amended

18.10.005 Appendix G is Amended
The following sections of Appendix G of the California Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.10.010 Section G101.4 is Amended
Section G101.4 is amended to read as follows:

G101.4 Violations. Any violation of a provision of this chapter or the City of Santa Clarita Flood Plain Ordinance, or failure to comply with a permit or variance issued pursuant to this appendix or any requirement of this appendix, shall be subject to the provisions of Section 114 of this code.

18.10.015 Section G101.5 is Amended
Section G101.5 is amended to read as follows:

G101.5 Designation of floodplain administrator. The Director of Public Works is designated as the floodplain administrator and is authorized and directed to enforce the provisions of this appendix. The floodplain administrator is authorized to delegate performance of certain duties to other employees of the jurisdiction. Such designation shall not alter any duties and powers of the building official.

18.10.020 Section G103.2 is Amended
Section G103.2 is amended to read as follows:

G103.2 Establishment of flood hazard areas. Flood hazard areas are established as outlined in Section 1612.3 of this code.

15.a
Packet Pg. 146
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 47 Chapter 18.11
AMENDMENTS TO CHAPTER 1 DIVISION II; ADMINISTRATION,

OF THE CALIFORNIA RESIDENTIAL CODE
Sections:

18.11.005 Chapter 1 Division II is Amended

18.11.010 Section R101.1 is Amended

18.11.020 Section R102.4.3 is Added

18.11.030 Section R102.7.1 is Amended

18.11.040 Sections R102.7.1.1 and R102.7.1.2 are Added

18.11.050 Section R105.2 is Amended

18.11.060 Section R105.2.2 is Amended

18.11.070 Section R106.1.4.1 is Added

18.11.005 Chapter 1 Division II is Amended.

The following sections of Chapter 1 Division II of the California Residential Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.11.010 Section R101.1 is Amended
Section R101.1 is amended to read as follows:

R101.1 Title. These regulations, including all duly adopted local amendments, shall become a part of the City of Santa Clarita Building Code and may also be referred to as the Santa Clarita Residential Code for One- and Two-family Dwellings, and shall hereinafter be referred to as ‘this code’.

18.11.020 Section R102.4.3 is Added
Section R102.4.3 is added to read as follows:

R102.4.3 Local Amendments. The amendments to Chapter 1, Division II Scope and Administration of the California Building Code, as adopted at the local level, shall also apply to projects regulated by the California Residential Code at the local level and shall be considered part of this code.

18.11.030 Section R102.7.1 is Amended
Section R102.7.1 is amended to read as follows:

R102.7.1 Additions, Alterations, or Repairs. Additions, alterations, or repairs to any structure shall conform to the requirements for a new structure without requiring the existing structure to comply with all of the requirements of this code except as outlined in sections R102.7.1.1 and R102.7.1.2. Additions, alterations, repairs, or relocations shall not cause an existing structure to become unsafe or adversely affect the performance of the building.

18.11.40 Sections R102.7.1.1 and R102.7.1.2 are Added
Sections R102.7.1.1 and R102.7.1.2 are added to read as follows:

R102.7.1.1 Substantial Improvement. Where the proposed work includes any demolition, alteration, repair, or relocation of more than 50 percent of the existing building or component of the building, the remaining portion of the building or building component shall be upgraded to comply with the structural provisions, as well as fire and life safety provisions of this code in such cases where the Building Official determines that the existing portions of the building are substantially deficient or pose a significant hazard.

When determining the percentage of demolition, alteration, repair, or relocation, one of the following

15.a
Packet Pg. 147
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 48 methods shall be applied, at the discretion of the Building Official:
a. A comparison of the square footage, lineal footage, or number of components or fixtures of the proposed demolition, alteration, repair, or relocation to the total square footage, lineal footage, or number of components or fixtures, as may be applicable. b. A comparison of the valuation of the proposed demolition, alteration, repair, or relocation to the valuation of the existing building.

The provisions of this section shall be cumulative over any 12 month period.

R102.7.1.2 Substantial Addition. Where the proposed work includes addition of new floor area that is greater than 100 percent of the existing building floor area, the existing portion of the building shall be upgraded to comply with the structural provisions, as well as fire and life safety provisions of this code in such cases where the Building Official determines that the existing portions of the building are substantially deficient or pose a significant hazard.

When determining the floor area of the existing building, the area of the garage or other unconditioned spaces shall not be included in the total area.

The provisions of this section shall be cumulative over any 12 month period.

18.11.050 Section R105.2 is Amended
Section R105.2 is amended to read as follows:

R105.2 Work Exempted from Permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of the City of Santa Clarita including such requirements as may be established by any city department or division or the requirements of any other governing agency. Unless otherwise exempted, separate plumbing, electrical, and mechanical permits will be required for any such items not exempted herein.

For a complete list of work that is exempt from a permit refer to Section 18.02.040 of the SCMC amending 105.2 Work Exempted from Permit of the 2022 California Building Code.

18.11.060 Section R105.2.2 is Amended
Section 105.2.2 is amended to read as follows:

105.2.2 Repairs and Maintenance. Application or notice to the Building Official is not required for ordinary maintenance or repairs to structures. In no case shall the repair or maintenance work create an unsafe condition or violate any provision of State code. Such repairs shall not include the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or load-bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a structure affecting the egress requirements.

For a complete list of maintenance or repairs that are exempt from a permit, refer to Section 18.02.050 of the SCMC amending 105.2.2 Repairs and Maintenance of the 2022 California Building Code.

18.11.070 Section R106.1.4.1 is Added
Section R106.1.4.1 is added to read as follows:

R106.1.4.1 Floodplain Management. Refer to Section 10.06 Floodplain Management of the SCMC.

Where R106.1.4 and Section 10.06 Floodplain Management of the SCMC conflict, Section 10.06 Floodplain Management of the SCMC shall prevail.

15.a
Packet Pg. 148
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 49 Chapter 18.12
AMENDMENTS TO CHAPTER 3; BUILDING PLANNING,

OF THE CALIFORNIA RESIDENTIAL CODE
Sections:

18.12.005 Chapter 3 is Amended

18.12.010 Section R301.1.3.2 is Amended

18.12.020 Section R301.1.5 is Added

18.12.030 Table R301.2 is Amended

18.12.040 Section R301.2.2 is Amended

18.12.050 Section R301.2.2.11 is Added

18.12.060 Section R322.1 is Amended

18.12.070 Section R322.1.5 is Amended

18.12.080 Section R322.2.1 is Amended

18.12.090 Section R322.2.2 is Amended

18.12.100 Section R322.2.3 is Amended

18.12.110 Section R322.3 is Deleted

18.12.120 Section R337 is Amended

18.12.005 Chapter 3 is Amended.

The following sections of Chapter 3 of the California Residential Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.12.010 Section R301.1.3.2 is Amended
Section R301.1.3.2 is amended to read as follows:

R301.1.3.2 Woodframe structures. The building official shall require structural construction documents to be approved and stamped by a California licensed architect or engineer for all dwellings of woodframe construction more than one story in height or with a basement.

18.12.020 Section R301.1.5 is Added
Section R301.1.5 is added to read as follows:

R301.1.5 Seismic design provisions for buildings constructed on or into slopes steeper than one unit vertical in three units horizontal (33.3 percent slope). The structural design and construction of new buildings and additions to existing buildings when constructed on or into slopes steeper than one unit vertical in three units horizontal (33.3 percent slope) shall comply with the California Building Code.

18.12.30 Table R301.2 is Amended
Table R301.2 is amended as follows:

15.a
Packet Pg. 149
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE)

Table R301.2
Climatic and Geographic Design Criteria

For SI: 1 pound per square foot = 0.0479 kPa, 1 mile per hour = 0.447 m/s a. Weathering may require a higher strength concrete or grade of masonry than necessary to satisfy the structural requirements of this code. The weathering column shall be filled in with the weathering index, “negligible,” “moderate” or “severe” for concrete as determined from Figure R301.2(1). The grade of masonry units shall be determined from ASTM C34, C55, C62, C73, C90, C129, C145, C216 or C652. b. The frost line depth may require deeper footings than indicated in Figure R403.1(1). The jurisdiction shall fill in the frost line depth column with the minimum depth of footing below finish grade.
c. The jurisdiction shall fill in this part of the table to indicate the need for protection depending on whether there has been a history of local subterranean termite damage.
d. The jurisdiction shall fill in this part of the table with the wind speed from the basic wind speed map [Figure R301.2(2)]. Wind exposure category shall be determined on a site-specific basis in accordance with Section R301.2.1.4. e. Temperatures shall be permitted to reflect local climates or local weather experience as determined by the building official. f. The jurisdiction shall fill in this part of the table with the seismic design category determined from Section R301.2.2.1. g. Date of the jurisdiction’s entry into the National Flood Insurance Program: April 25, 1980. Date of the Flood Insurance Study: June 2021. Panel numbers and dates of the currently effective FIRMs and FBFMs or other flood hazard map adopted by the authority having jurisdiction, as amended: all panels for Community 060729.
h. In accordance with Sections R905.1.2, R905.4.3.1, R905.5.3.1, R905.6.3.1, R905.7.3.1 and R905.8.3.1, where there has been a history of local damage from the effects of ice damming, the jurisdiction shall fill in this part of the table with “YES.” Otherwise, the jurisdiction shall fill in this part of the table with “NO.” i. The jurisdiction shall fill in this part of the table with the 100-year return period air freezing index (BF-days) from Figure R403.3(2) or from the 100-year (99 percent) value on the National Climatic Data Center data table “Air Freezing Index-USA Method (Base 32°F).” j. The jurisdiction shall fill in this part of the table with the mean annual temperature from the National Climatic Data Center data table “Air Freezing Index-USA Method (Base 32°F).”
k. In accordance with Section R301.2.1.5, where there is local historical data documenting structural damage to buildings due to topographic wind speed-up effects, the jurisdiction shall fill in this part of the table with “YES.” Otherwise, the jurisdiction shall indicate “NO” in this part of the table. l. In accordance with Figure R301.2(2), where there is local historical data documenting unusual wind conditions, the jurisdiction shall fill in this part of the table with “YES” and identify any specific requirements. Otherwise, the jurisdiction shall indicate “NO” in this part of the table. m. In accordance with Section R301.2.1.2, the jurisdiction shall indicate the wind-borne debris wind zone(s). Otherwise, the jurisdiction shall indicate “NO” in this part of the table.
n. The jurisdiction shall fill in these sections of the table to establish the design criteria using Table 1a or 1b from ACCA Manual J or established criteria determined by the jurisdiction.
o. The jurisdiction shall fill in this section of the table using the Ground Snow Loads in Figure R301.2(3). p. Contact Building & Safety for information.

50 15.a
Packet Pg. 150
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 51 18.12.040 Section R301.2.2 is Amended
Section R301.2.2 is amended as follows:

Buildings in Seismic Design Categories C, D, and E shall be designed to resist seismic loads in accordance with the California Building Code as amended by the City of Santa Clarita. Elements of the lateral force resisting system which are designed to resist seismic loads shall comply with the provisions of the California Building Code as amended by the City of Santa Clarita.

18.12.050 Section R301.2.2.11 is Added
Section R301.2.2.11 is added as follows:

R301.2.2.11 Anchorage of Mechanical, Electrical, or Plumbing Components and Equipment.

Mechanical, electrical, or plumbing components and equipment shall be anchored to the structure in accordance with the requirements of ASCE 7 Chapter 13.

18.12.060 Section R322.1 is Amended
Section R322.1 is amended as follows:

R322.1 General. Buildings and structures constructed in whole or in part in flood hazard areas, including A Zones, as established in Table 301.2, and substantial improvement and restoration of substantial damage of buildings and structures in flood hazard areas, shall be designed and constructed in accordance with the provisions contained in this section and Section 10.06 Floodplain Management of the SCMC. Where this section and Section 10.06 Floodplain Management of the SCMC conflict, Section 10.06 Floodplain Management of the SCMC shall prevail. Buildings and structures that are located in more than one flood hazard area shall comply with the provisions associated with the most restrictive flood hazard area.

Buildings and structures located in whole or in part in identified floodways shall be designed and constructed in accordance with ASCE 24 and Section 10.06 Floodplain Management of the SCMC. Where ASCE 24 and Section 10.06 Floodplain Management of the SCMC conflict, Section 10.06 Floodplain Management of the SCMC shall prevail.

18.12.070 Section R322.1.5 is Amended
Section R322.1.5 is amended as follows:

Remove “including basement” from the text.

18.12.80 Section R322.2.1 is Amended
Section R322.2.1 is amended as follows:

Condition 1 is amended as follows:

1. Buildings and structures in flood hazard areas shall have the lowest floors elevated to the base flood elevation plus 1 foot.

Remove “(including basement)” from the text in Condition 2.

Condition 3 is amended as follows:

3. Basement floors that are below grade on all sides shall be elevated to the base flood elevation plus 1 foot.

Exception to Condition 3 is amended as follows:

Exception: Enclosed areas below the design flood elevation shall meet the requirements of Section R322.2.2

15.a
Packet Pg. 151
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 52 18.12.090 Section R322.2.2 is Amended
Section R322.2.2 is amended as follows:

Condition 2.1.1 is added as follows:

2.1.1 The engineered opening shall be certified by the Federal Emergency Management Agency (FEMA).

18.12.100 Section R322.2.3 is Amended
Section R322.2.3 is amended as follows:

Remove Condition 3 under the exception.

18.12.110 Section R322.3 is Deleted
Section R322.3 is deleted in its entirety.

18.12.120 Section R337 is Amended
Section R337 is amended as follows:

Refer to Section 18.02.240 of the SCMC, added Section 118 Fire Hazard Zones ("Very High Fire Hazard Severity Zones"), for items which are added, deleted, or amended.

15.a
Packet Pg. 152
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 53 Chapter 18.13
AMENDMENTS TO CHAPTER 4; FOUNDATIONS,

OF THE CALIFORNIA RESIDENTIAL CODE
Sections:

18.13.005 Chapter 4 is Amended

18.13.010 Section R401.1 is Amended

18.13.020 Section R403.1.2 is Amended

18.13.030 Section R403.1.3.4 is Amended

18.13.040 Section R403.1.3.6 is Amended

18.13.050 Section R403.1.4 is Amended

18.13.060 Section R403.1.5 is Amended

18.13.070 Section R403.1.6.1.1 is Added

18.13.080 Section R403.1.6.2 is Added

18.13.090 Section R404.2 is Amended

18.13.005 Chapter 4 is Amended.

The following sections of Chapter 4 of the California Residential Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.13.010 Section R401.1 is Amended
Section R401.1 is amended to read as follows:

R401.1 Application. The provisions of this chapter shall control the design and construction of the foundation and foundation spaces for all buildings. In addition to the provisions of this chapter, the design and construction of foundations in areas prone to flooding as established by Table R301.2 shall meet the provisions of Section R322. Wood foundations shall not be permitted.

18.13.020 Section R403.1.2 is Amended
Section R403.1.2 is amended to read as follows:

R403.1.2 Continuous footing in Seismic Design Categories D0, D1 and D2. Exterior walls of buildings located in Seismic Design Categories D0, D1 and D2 shall be supported by continuous solid or fully grouted masonry or concrete footings. All required interior braced wall panels in buildings located in Seismic Design Categories D0, D1 and D2 shall be supported by continuous foundations.

18.13.030 Section R403.1.3.4 is Amended
Section R403.1.3.4 is amended to read as follows:

R403.1.3.4 Interior bearing and braced wall panel footings in Seismic Design Categories D0, D1 and D2. Where a geotechnical report is not provided and the presence of expansive soils is unknown, the minimum depth of footings shall be 18 inches (458 mm) for interior bearing and braced walls. Such footings shall be reinforced with a minimum of two #4 rebar at the top and two #4 rebar at the bottom.

Exception: The minimum footing depth for unoccupied Group U structures or patio structures accessory to a Group R-3 occupancy shall be 12 inches (305 mm).

Otherwise, the minimum depth of footings below the undisturbed ground surface shall be 12 inches (305 mm).

18.13.040 Section R403.1.3.6 is Amended
Section R403.1.3.6 is amended to as follows:

15.a
Packet Pg. 153
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 54 R403.1.3.6 Isolated concrete footings. Isolated plain concrete footings are not permitted for exterior walls or interior braced and/or bearing walls.

18.13.050 Section R403.1.4 is Amended
Section R403.1.4 is amended to read as follows:

R403.1.4 Minimum Depth. Where a geotechnical report is not provided and the presence of expansive soils is unknown, the minimum depth of footings shall be 24 inches (610 mm) for exterior walls and 18 inches (458 mm) for interior bearing and braced walls. Such footings shall be reinforced with a minimum of two #4 rebar at the top and two #4 rebar at the bottom.

Exception: The minimum footing depth for unoccupied Group U structures or patio structures accessory to a Group R-3 occupancy shall be 12 inches (305 mm).

Otherwise, the minimum depth of footings below the undisturbed ground surface shall be 12 inches (305 mm). Where applicable, the depth of footings shall also conform to Section R403.1.4.1.

18.13.060 Section R403.1.5 is Amended
Section R403.1.5 is amended to read as follows:

R403.1.5 Slope. The top surface of footings shall be level. The bottom surface of footings shall be permitted to have a slope not exceeding one unit vertical in 10 units horizontal (10-percent slope). Footings shall be stepped where it is necessary to change the elevation of the top surface of the footing or where the surface of the ground slopes more than one unit vertical in 10 units horizontal (10-percent slope).

Stepped footings shall be reinforced with a minimum of two #4 rebar at the top and two #4 rebar at the bottom.as shown in Figure R403.1.5.

FIGURE R403.1.5

15.a
Packet Pg. 154
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 55 18.13.070 Section R403.1.6.1.1 is Added
Section R403.1.6.1.1 is added as follows:

R403.1.6.1.1 Power Actuated Fasteners. Power actuated fasteners shall not be used to anchor sill plates or tracks except at interior non-bearing walls not designed as shear walls.

18.13.080 Section R403.1.6.2 is Added
Section R403.1.6.2 is added as follows:

R403.1.6.2 Light-gage mudsill anchors. Light-gage mudsill anchors which are intended to be bent upon installation shall not be used to anchor braced walls. Where light-gage anchors are used at exterior non- braced walls, they shall be fully protected by the exterior weather barrier assembly or by an approved corrosion-resistant coating.

18.13.090 Section R404.2 is Amended
Section R404.2 is amended to read as follows:

R404.2 Wood foundation walls. Wood foundation walls shall not be permitted.

15.a
Packet Pg. 155
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 56 Chapter 18.14
AMENDMENTS TO CHAPTER 5; FLOORS,

OF THE CALIFORNIA RESIDENTIAL CODE
Sections:

18.14.005 Chapter 5 is Amended

18.14.010 Section R501.1 is Amended

18.14.020 Section R503.2.4 is Added

18.14.030 Figure R503.2.4 is Added

18.14.005 Chapter 5 is Amended.

The following sections of Chapter 5 of the California Residential Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.14.010 Section R501.1 is Amended
Section R501.1 is amended to read as follows:

R501.1 Application. The provisions of this chapter shall control the design and construction of the floors for all buildings including the floors of attic spaces used to house mechanical or plumbing fixtures and equipment. Mechanical or plumbing fixtures and equipment shall be attached (or anchored) to the structure in accordance with Section R301.2.2.11.

18.14.020 Section R503.2.4 is Added
Section R503.2.4 is added to read as follows:

R503.2.4 Openings in horizontal diaphragms. Openings in horizontal diaphragms with a dimension perpendicular to the joist that is greater than 4 feet (1.2 m) shall be constructed in accordance with Figure R503.2.4.

15.a
Packet Pg. 156
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 57 18.14.030 Figure R503.2.4 is Added
Figure R503.2.4 is added:

15.a
Packet Pg. 157
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 58 Sections:

Chapter 18.15
AMENDMENTS TO CHAPTER 6; WALL CONSTRUCTION,

OF THE CALIFORNIA RESIDENTIAL CODE

18.15.005 Chapter 6 is Amended

18.15.010 Section R602.3.2 is Amended

18.15.020 Section R606.4.4 is Amended

18.15.030 Section R606.12.2.2.3 is Amended

18.15.005 Chapter 6 is Amended.

The following sections of Chapter 6 of the California Residential Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.15.010 Section R602.3.2 is Amended
Exception of section R602.3.2 is amended as follows:

Remove the exception to section R602.3.2.

18.15.020 Section R606.4.4 is Amended
Section R606.4.4 is amended to read as follows:

R606.4.4 Parapet walls. Masonry parapet walls shall be reinforced in accordance with Section R606.12.

18.15.30 Section R606.12.2.2.3 is Amended
Section R606.12.2.2.3 is amended to read as follows:

R606.12.2.2.3 Reinforcement requirements for masonry elements. Masonry elements listed in Section R606.12.2.2.2 shall be reinforced in either the horizontal or vertical direction as shown in Figure R606.11(3) and in accordance with the following:

1. Horizontal reinforcement. Horizontal joint reinforcement shall consist of at least one No. 4 bar spaced not more than 48 inches (1219 mm). Horizontal reinforcement shall be provided within 16 inches (406 mm) of the top and bottom of these masonry elements.

2. Vertical reinforcement. Vertical reinforcement shall consist of at least one No. 4 bar spaced not more than 48 inches (1219 mm). Vertical reinforcement shall be within 8 inches (203mm) of the ends of masonry walls.

15.a
Packet Pg. 158
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 59 Sections:

Chapter 18.16
AMENDMENTS TO CHAPTER 8; ROOF-CEILING CONSTRUCTION,

OF THE CALIFORNIA RESIDENTIAL CODE

18.16.005 Chapter 8 is Amended

18.16.010 Section R803.2.4 is Added

18.16.005 Chapter 8 is Amended.

The following sections of Chapter 8 of the California Residential Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.16.010 Section R803.2.4 is Added
Section R803.2.4 is added to read as follows:

R803.2.4 Openings in horizontal diaphragms. Openings in horizontal diaphragms shall conform to Section R503.2.4.

15.a
Packet Pg. 159
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 60 Sections:

Chapter 18.17
AMENDMENTS TO CHAPTER 9; ROOF ASSEMBLIES,

OF THE CALIFORNIA RESIDENTIAL CODE

18.17.005 Chapter 9 is Amended

18.17.010 Section R901.2 is Added

18.17.005 Chapter 9 is Amended.

Chapter 9 of the California Residential Code, as adopted by Chapter 18.01 hereof, is amended as follows:

18.17.010 Section R901.2 is Added
Section R901.2 is added to read as follows:

901.2 Refer to Section 18.03 Amendments to Chapter 15; Roof Assemblies and Rooftop Structures of the SCMC for items which are added, deleted, or amended.

15.a
Packet Pg. 160
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 61 Sections:

Chapter 18.18
AMENDMENTS TO CHAPTER 10; CHIMNEYS AND FIREPLACES,

OF THE CALIFORNIA RESIDENTIAL CODE

18.18.005 Chapter 10 is Amended

18.18.010 Section R1001.3.1 is Amended

18.18.005 Chapter 10 is Amended.

The following sections of Chapter 10 of the California Residential Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.18.010 Section R1001.3.1 is Amended
Section R1001.3.1 is amended to read as follows:

R1001.3.1 Vertical reinforcing. For chimneys up to 40 inches (1016 mm) wide, four No. 4 continuous vertical bars adequately anchored into the concrete foundation shall be placed between wythes of solid masonry or within the cells of hollow unit masonry and grouted in accordance with Section R606. Grout shall be prevented from bonding with the flue liner so that the flue liner is free to move with thermal expansion. For chimneys more than 40 inches (1016 mm) wide, two additional No. 4 vertical bars adequately anchored into the concrete foundation shall be provided for each additional flue incorporated into the chimney or for each additional 40 inches (1016 mm) in width or fraction thereof.

15.a
Packet Pg. 161
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 62 Chapter 18.19
AMENDMENTS TO CHAPTER 5; PRESCRIPTIVE COMPLIANCE METHOD, OF

THE CALIFORNIA EXISTING BUILDING CODE

Sections:

18.19.005 Chapter 5 is Amended

18.19.010 Sections 503.7.1 and 503.7.2 are Added

18.19.005 Chapter 5 is Amended
The following sections of Chapter 5 of the California Existing Building Code, as adopted by Chapter 18.01 hereof, are added, deleted, or amended as follows:

18.19.010 Sections 503.7.1 and 503.7.2 are Added
Sections 503.7.1 and 503.7.2 are added to read as follows:

503.7.1 Additional anchorage provisions for concrete and reinforced masonry walls. Where an existing building’s structural system includes concrete or reinforced masonry walls with a flexible roof diaphragm, the existing roof-to-wall connections and sub-diaphragms shall be analyzed and upgraded as required by this section. The provisions of this section shall not exempt any building from the requirements of sections 503.7, 503.11, or 506.5.3.

Exceptions:

1. The requirements of this section shall not apply to areas of the building which are under separate ownership from the area of addition or alteration.

2. The requirements of this section shall not apply to areas of the building which are leased and occupied separately from the area of addition or alteration.

3. The requirements of this section shall not apply where access to more than 50 percent of the existing roof structure is obstructed by existing framed ceilings, fire-rated assemblies, or other fixed elements which are not being removed or relocated as part of the proposed project.

503.7.1.1 Additions. Where the area of an addition exceeds 25 percent of the original building area, the requirements of section 503.7.2 shall be met.

503.7.1.2 Additions and alterations. Where the combined area of an addition and alteration exceeds 50 percent of the original building area, the requirements of section 503.7.2 shall be met.

502.7.1.3 Alteration with a change in occupancy group. Where an alteration includes one of the following changes in occupancy group as defined in the California Building Code, and the altered area exceeds 50 percent of the building area or lease area, whichever is smaller, the requirements of section 503.7.2 shall be met.

1. Change from occupancy group S or U to occupancy group B, M, or F, or

2. Change from any occupancy group to occupancy group A, E, H, I, L, or R.

503.7.2 Roof anchorage structural requirements. Where required by section 503.7.1, all roof-to-wall connections shall be capable of transferring the reduced seismic forces specified in section 304.3.2. Roof to wall anchorage connections shall extend into the diaphragm a distance to develop the force transferred into the diaphragm. Structural calculations and drawings shall be sealed and signed by a California licensed civil or structural engineer.

15.a
Packet Pg. 162
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 63 Title 19

CITY ELECTRICAL CODE
Chapters:

19.01 Adoption of the City Electrical Code

19.02 Amendments to CEC Chapter 1; General

19.03 Amendments to CEC Annex H (Article 80); Administration and Enforcement

15.a
Packet Pg. 163
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 64 Chapter 19.01

ADOPTION OF THE CITY ELECTRICAL CODE

Sections:

19.01.010 Adoption of the City Electrical Code

19.01.010 Adoption of the City Electrical Code

There is adopted by reference that certain code known and designated as the California Code of Regulations, Title 24, Part 3, further described and referred to as the 2022 California Electrical Code published by the California Building Standards Commission and based on the National Electric Code®, 2020 Edition, prepared by the National Fire Protection Association.

Adoption of said code shall include those articles, sections, and annexes requiring enforcement by the local building department and as further amended by the City of Santa Clarita with provisions intended to address local climatic, geologic, and/or topographic conditions, as permitted by State law. Adoption of said code shall include adoption of the following annexes: Annex A, Product Safety Standards, Annex B, Application Information for Ampacity Calculation, Annex C, Tables, Annex D, Examples, Annex E, Types of Construction, Annex F, Critical Operations power Systems, and Annex H, Administration.

Such code shall become and be the Santa Clarita Electrical Code, regulating and controlling the design, construction, installation, quality of materials, location, operation and maintenance of electrical systems, equipment and appliances. The provisions of said code shall provide for the issuance of permits and collection of fees thereof, and providing penalties for violation of such Code.

The City Electrical Code shall become effective for new permit applications received by the city on or after January 1, 2023.

At least one copy of the City Electrical Code has been deposited in the office of the City Clerk and shall be at all times maintained by the clerk for use and examination by the public.

15.a
Packet Pg. 164
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 65 Chapter 19.02
AMENDMENTS TO CHAPTER 1; GENERAL,

OF THE CALIFORNIA ELECTRICAL CODE
Sections:

19.02.005 Chapter 1; General is Amended

19.02.010 Article 100 is Amended

19.02.005 Chapter 1; General is Amended
The following sections of Chapter 1 of the California Electrical Code, as adopted by Chapter 19.01 hereof, are added, deleted, or amended as follows:

19.02.010 Article 100 is Amended
Article 100 Definitions is amended to add the following definitions and declarations:

Grade (adjacent Ground Elevation). The lowest point of elevation of the finished surface of the ground, paving or sidewalk within the area between the building and the property line or, when the property line is more than five feet from the building, between the building and a line five feet from the building.

Hotel. Any building containing six or more guest rooms intended or designed to be used, or which are used, rented or hired out to be occupied, or which are occupied for sleeping purposes by guests.

15.a
Packet Pg. 165
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 66 Chapter 19.03
AMENDMENTS TO ANNEX H (ARTICLE 80)

OF THE CALIFORNIA ELECTRICAL CODE
Sections:

19.03.005 Annex H, Article 80, is Amended

19.03.010 Section 80.7 is Deleted

19.03.020 Section 80.13 is Amended

19.03.030 Section 80.13(17) is Added

19.03.040 Section 80.15 is Amended

19.03.050 Section 80.19(A)(3) is Added

19.03.060 Section 80.19(C) is Amended

19.03.070 Section 80.19(D) is Amended

19.03.080 Section 80.19(E) is Amended

19.03.090 Section 80.21 is Amended

19.03.100 Sections 80.21(D), (E), (F), and (G) are Added

19.03.110 Section 80.23(B)(3) is Amended

19.03.120 Section 80.25 is Amended

19.03.130 Section 80.27 is Deleted

19.03.140 Section 80.29 is Amended

19.03.150 Section 80.35 is Deleted

19.03.005 Annex H, Article 80, is Amended
The following sections of Annex H, Article 80, of the California Electrical Code, as adopted by Chapter 19.01 hereof, are added, deleted, or amended as follows:

19.03.010 Section 80.7 is Deleted
Section 80.7 is deleted in its entirety.

19.03.020 Section 80.13 is Amended
Section 80.13 is amended to read as follows:

80.13 Authority. There is established within the City of Santa Clarita a division in the Community Development Department to be known as the Building & Safety Division under the administrative and operational control of the City Building Official hereinafter referred to as the Building Official. Where used in this article, the term authority having jurisdiction shall be construed to mean the Building Official or other individuals designated by the Building Official.

This Code shall be administered and enforced by the authority having jurisdiction designated by the governing body as follows.
(Provisions 1 through 16 under this section remain the same)

19.03.030 Section 80.13(17) is Added
Section 80.13(17) is added to read as follows:

(17) A written application shall be submitted for a proposed alternate material, method of construction or waiver together with a fee established by the City Council. The details of any action granting an alternate material or method of construction shall be noted in the files of the Building & Safety Division of the city.

15.a
Packet Pg. 166
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 67 19.03.040 Section 80.15 is Amended
Section 80.15 is amended in its entirety to read as follows:

80.15 Electrical Board. The electrical board shall be the Appeals Board as established under the provisions of the Santa Clarita Building Code Section 18.02.190, hereinafter designated as the Board.

19.03.050 Section 80.19(A)(3) is Added
Section 80.19(A)(3) is added to read as follows:

(3) The authority having jurisdiction may refuse to issue a permit for temporary or permanent service when there is no apparent legally permitted use for the service. In determining whether a proposed use is legally permitted, the authority having jurisdiction may consider not just the provisions of the Electrical Code but all applicable statutes, ordinances, rules and regulations.

19.03.60 Section 80.19(C) is Amended
Section 80.19(C) is amended in its entirety to read as follows:

80.19(C) Issuance of Permits. The authority having jurisdiction is authorized to issue a permit to the applicant for the work described in the application and plans filed therewith, when it is determined that all of the following items comply:

1. The proposed work conforms to the requirements of this code and other pertinent laws and ordinances; and any documentation necessary to demonstrate compliance has been submitted and approved by the Building Official or other individuals designated by the Building Official.

2. The required clearances from all other agencies have been obtained.

3. The appropriate fees specified by this code have been paid.

When a permit is issued and plans and/or specifications have been required to be provided, the authority having jurisdiction shall endorse in writing or stamp upon the plans and/or specifications “APPROVED.” Such approved plans and specifications shall not be changed, modified or altered without authorizations from the authority having jurisdiction and the design professional of record when applicable. All work regulated by this code shall be done in accordance with the approved plans, however the approval of the plans shall not be construed as a waiver of any requirement of this code, or any other law or ordinance, unless specific documentation such as that required by Sections 80.13 (15) and (16) is provided. The issuance of a permit shall not be deemed to certify that the site of the described work is safe.

No permit shall be required for the following electrical work:

1. Minor repair work such as the replacement of lamps, switches, receptacle devices, sockets, taping bare joints and the like, or the connection of portable motor and appliances to suitable receptacles which have been permanently installed.

2. The temporary wiring for temporary theater, motion picture or television stage sets.

3. The repair of fixed motors, transformers, apparatus, or appliances.

4. Temporary holiday decorative lighting provided no such lighting is ‘hard wired’ directly into an electric panel or sub-panel.

5. The installation of temporary wiring for testing or experimental purposes within suitable facilities.

6. Repair or replacement-in-kind of overcurrent devices.

15.a
Packet Pg. 167
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 68 7. Portable generators, motors, appliances, tools, power outlets, and other portable equipment connected by means of a cord or cable having an attachment plug.

8. The installation by Southern California Edison Company of radio-controlled relays on privately owned air conditioning and agricultural irrigation pumping equipment in the company’s pilot program of energy conservation through electrical load management, entitled “Air Conditioner Cycling and Agricultural and Pumping Interruptible Programs” provided that:
a. The relays shall be tested and labeled by Underwriters’ Laboratories, Inc. b. The Building Official shall approve of specifications for the installation of the relays. c. The relays shall be installed and maintained by Southern California Edison Company or its contractors.
d. The Southern California Edison Company shall make available for random inspection, upon request of and by the city, designated relay installations to ensure code compliance.

9. Private telephone, intercom, sound and communication systems, data, security alarm, and television cable in single family dwellings; provided, however, that a permit shall be obtained for any added circuits supplying the power supplies required by the above systems.

10. Nonresidential communication, telephone, and data cabling systems. Nonresidential security systems may be exempted when such system is independent of the fire protection/alarm system.

11. Exemption for Utilities. The provisions of this code shall not apply to any electrical work performed by or for any electrical corporation, telephone corporation, telegraph corporation, railroad corporation or street railroad corporation on or with any electrical equipment owned or controlled and operated or used by, and for the exclusive benefit of, such corporation in the conduct of its business as a public utility, or to any other work which any such corporation shall be entitled by law to perform without payment of any local tax; but all provisions of this code shall apply insofar as they may consistently with the above be applicable to all other electrical work performed by or for any such corporation.

The terms “electrical corporation,” “telephone corporation,” “telegraph corporation,” “railroad corporation,” and “street railroad corporation,” are herein used as said terms are respectively defined in the Public Utility Code of the State of California; and such terms shall also be deemed to include similar utilities which are municipally or governmentally owned and operated.

Notwithstanding the foregoing, all electrical wiring and equipment installed, altered, repaired, or replaced shall comply with the provisions of this code.

19.03.70 Section 80.19(D) is Amended
Section 80.19(D) is amended in its entirety to read as follows:

(D) Owner-Builder permits. When applying for an ‘Owner-Builder’ permit for an electrical installation and such installation is of a more complex nature including but not limited to any of the following:

1. Installation or modification of distribution equipment, including main service and subpanels,

2. Installation of any interconnected power production systems,

3. Installation of any circuit greater than 20 amps,

the permittee must show that the work will be performed by a ‘Qualified Person’ as defined in Article 100 and as demonstrated by one of the following:

15.a
Packet Pg. 168
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 69 1. Documentation acceptable to the authority having jurisdiction of training demonstrating the permittee or his employee possesses the skills and knowledge related to the construction and operation of the electrical equipment and/or installation as described in the permit including documentation of safety training to recognize and avoid the hazards involved. Any of the following could be considered acceptable documentation:
a. A journeyman electrician certificate
b. A C-10 electrical contractor’s license
c. A certificate or other documentation showing satisfactory completion of a course in electrical installation and safety training from an accredited trade school d. A degree in electrical engineering from an accredited college or university e. Completion of electrical safety training complying with NFPA 70E-2015 f. Other documentation acceptable to the authority having jurisdiction Exception: If competency to perform portions of the work is demonstrated to the authority having jurisdiction, the permit can be issued based on competency level, with conditions that may apply.

2. Where the permittee chooses to have the work done by a licensed electrical contractor, the name and license information of the contractor shall be provided.

19.03.080 Section 80.19(E) is Amended
Section 80.19(E) is amended in its entirety to read as follows:

(E) Fees.

1. General. The city shall collect such fees as are required by this code as established by the City Council and issue receipts therefor, copies of which shall be maintained as record in the office of Building & Safety.

2. Cost of Permit. The cost of electrical permits shall be as established by the City Council.

3. Refund. In the event that any person shall have obtained an electrical permit and no portion of the work covered by such permit has been commenced and such permit shall have been canceled and a written request for cancellation, having been approved by the authority having jurisdiction, the applicant/permittee may request a refund from the city for a maximum of eighty (80) percent of the permit fees paid excluding issuance fees or plan review fees.

The applicant shall present all necessary documentation including the original signed permit and inspection record card to the authority having jurisdiction showing they are entitled to receive such refund of the permit fee as described above. No refunds shall be granted more than 90 days after the date the permit or application for permit has expired, become inactive, been cancelled, or passed a final inspection. No refund shall be made for a permit which was obtained by falsification or misrepresentation and which was subsequently revoked for such cause.

4. Work without a Permit. Whenever any work for which a permit is required by this code has been commenced without first obtaining said permit, a special investigation shall be made before a permit may be issued for such work. An investigation fee shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be twice the amount of the permit fee required by this code and shall be in addition to any fees for permits issued in connection with the work investigated. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code nor from any penalty prescribed by law.

19.03.090 Section 80.21 is Amended
Section 80.21 is amended to read as follows:

15.a
Packet Pg. 169
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 70 80.21 Plans Review. Review of plans and specifications, submittal document requirements, plan review fees, and expiration of plan review shall conform to (A) through (G).

19.03.100 Sections 80.21(D), (E), (F), and (G) are Added Sections 80.21(D), (E), (F), and (G) are added to read as follows:

(D) Submittal Documents. The authority having jurisdiction shall require the submission of plans, specifications, drawings, descriptions and diagrams as appropriate to clearly show the character, kind, and extent of electrical work covered by an application for a permit. Such documents may be submitted in electronic format upon approval of the authority having jurisdiction.

Exception: If in the opinion of the authority having jurisdiction the scope of work is determined to be of a minor nature, the submittal of such documents may be waived by the authority having jurisdiction.

(E) Information Required on Plans.

1. Every plan required by section (D) of this section shall be a print or other type approved by the Building & Safety Division. Electronic media documents may be submitted as determined by the Building Official. The information contained on the plans shall be drawn in a professional manner, be clearly legible and contain the information required in section (E)(2) of this section.

Labeling, lettering, dimensioning, and numbering shall be of a size and style to be easily read and shall be in conformance with accepted professional practices and standards for architectural and engineering documents. Reasonable symbols satisfactory to the Division shall be used in all plans.

Submitted plans and specifications, which are deemed incomplete or incorrect, shall be returned to the architect or registered engineer or other individual in general responsible charge with a request for compliance with these regulations before checking is begun or resumed by Building & Safety Division staff.

2. The following is required to be shown on the plans for all electrical installations requiring a permit:
a. A complete single-line diagram;
b. The type, location, and capacity of all service equipment; c. The size and length of all feeder raceways;
d. The dimensions of all pull or junction boxes larger than four (4) inches trade size; e. The number, size, and type of all conductors to be installed in each feeder circuit; f. The location of every proposed outlet and switch in all parts of the building or structure, including all fixed showcases, wall-cases, office furnishings, and similar wiring and the location of all existing circuits and outlets within or related to the areas of new or modified electrical installations;
g. The location, voltage and HP rating of every motor that is not a component of a listed appliance and the KW rating of every generator;
h. The location and KVA or equivalent rating of each transformer and similar equipment; and the location and ampere or wattage rating of other appliances of the noninductive type;
i. Details of panelboard, switchboard and motor control center schedules, showing wattage and amperage, of active branch circuits to be installed or modified, and the number of spare branch circuits for future use. This shall include identifying the circuits to which the outlets are connected and listing the number and type of outlets; j. A lighting fixture schedule;

15.a
Packet Pg. 170
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 71 k. The existing load, as calculated in accordance with Articles 210 and 220 of the NEC or by other methods satisfactory to the authority having jurisdiction shall be indicated for existing installations, alterations, or additions made thereto; l. Other additional information as the authority having jurisdiction may consider necessary for proper enforcement of this code.

Exception (1): R-3 and U occupancies that are accessory to R-3. Information required is limited to the location of all electrical outlets, including, but not limited to receptacles, switches, lighting, power for appliances, disconnecting means for appliances, and the location and size of the electrical service and any sub-panel(s). Alternative power source systems and specialized electrical installations may require more information on the plans.

Exception (2): Some or all plan requirements may be waived at the discretion of the authority having jurisdiction for work considered to be of a minor nature.

(F) Plan Review Fees. Plan review fees shall be paid in full when the plans are submitted for review. The cost of the electrical plan review shall be as established by the City Council.

(G) Expiration of Plan Review. Applications for which no electrical permit has been issued within twelve months days following the date of application, shall expire by limitation, and plans and other data submitted for review may thereafter be returned to the applicant or destroyed by the authority having jurisdiction. The authority having jurisdiction may extend the time for action by the applicant for a period not exceeding one hundred eighty (180) days on request by the applicant which includes sufficient justification for the extension. The authority having jurisdiction may collect a fee for any application for extension of plan review in accordance with the city’s fee schedule. No application shall be extended more than twice. In order to renew action on an application after expiration, the applicant shall resubmit plans and pay a new plan review fee.

19.03.110 Section 80.23(B)(3) is Amended
Section 80.23(B)(3) is amended to read as follows:

(3) Any person, firm, or corporation who violates any of the provisions of this code is guilty of a misdemeanor punishable by a fine not exceeding one thousand dollars ($1,000) or by imprisonment not exceeding six (6) months, or by both such fine and imprisonment, (see Section 17995 of the State Health and Safety Code), unless such violation is otherwise declared to be an infraction by the City Council. Such person shall be guilty of a separate offense for each and every day or portion thereof during which any violation of any of the provisions of this code is committed, continued, or permitted to remain.

19.03.120 Section 80.25 is Amended
Section 80.25 is amended to read as follows:

80.25 Connection to Electricity Supply. Connection to the electric supply shall conform to (A) through (D).

(A) Authorization. Except as provided in 80.25, it shall be unlawful for any person, firm, or corporation to make connection to a supply of electricity or to supply electricity to any electric equipment installation for which a permit is required or that has been disconnected or ordered to be disconnected.

(B) Special Consideration. By special permission of the authority having jurisdiction, temporary power shall be permitted to be supplied to the premises for specific needs of the construction project.

15.a
Packet Pg. 171
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 72 (C) Disconnection. The authority having jurisdiction is empowered to disconnect or to order in writing the discontinuance of electrical service to wiring, devices or materials found to be dangerous and a hazard to life, health and property until the installation of such wiring, device or material has been made safe as directed by the authority having jurisdiction.

Any person, firm, corporation, public utility, political subdivision or governmental agency ordered to discontinue such electrical service shall do so within twenty-four (24) hours after the receipt of such written notice and shall not reconnect such service or allow or cause the same to be reconnected until notified to do so by the authority having jurisdiction.

(D) Service upgrades. Prior to the replacement of any electrical service, the licensed electrical contractor shall contact the local Utility Planning Department for guidance and shall proceed as directed by the Utility. Electrical supply lines shall not be reconnected to the service equipment until the installation has been inspected by the authority having jurisdiction or an authorized representative of the Building Official. Under no circumstances shall a representative of the City of Santa Clarita inspect a service with exposed, energized components.

19.03.130 Section 80.27 is Deleted
Section 80.27 is deleted in its entirety.

19.03.140 Section 80.29 is Amended
Section 80.29 is amended to read as follows:

80.29 Liability for Damages. Article 80 shall not be construed to affect the responsibility or liability of any party owning, designing, operating, controlling, or installing any electrical equipment for damages to persons or property caused by a defect therein, nor shall the City of Santa Clarita or any of its employees by held as assuming any such liability by reason of the inspection, re-inspection, or other examination authorized.

19.03.150 Section 80.35 is Deleted
Section 80.35 is deleted in its entirety.

15.a
Packet Pg. 172
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 73 Title 20

CITY PLUMBING CODE
Chapters:

20.01 Adoption of the City Plumbing Code

20.02 Amendments to CPC Chapter 1 Division II; Administration

20.03 Amendments to CPC Chapter 3; General Regulations

20.04 Amendments to CPC Chapter 7; Sanitary Drainage

15.a
Packet Pg. 173
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 74 Chapter 20.01

ADOPTION OF THE CITY PLUMBING CODE

Sections:

20.01.010 Adoption of the City Plumbing Code

20.01.010 Adoption of the City Plumbing Code

There is hereby adopted by reference that certain code known and designated as the California Code of Regulations, Title 24, Part 5, further described and referred to as the 2022 California Plumbing Code published by the California Building Standards Commission and based on the Uniform Plumbing Code®, 2021 Edition, prepared by the International Association of Plumbing and Mechanical Officials.

The adoption of said code shall include those sections requiring enforcement by the local building department as mandated by the State and as further amended by the City of Santa Clarita with provisions intended to address local climatic, geologic, and topographic conditions, as permitted by State law. Adoption of said code shall include the adoption of the following appendices: Appendix A, Appendix B, Appendix D, Appendix G, and Appendix I.

Such code shall become and be the Santa Clarita Plumbing Code, regulating plumbing and drainage systems, house sewers, private sewage disposal, drainage systems, and prescribing conditions under which such work may be carried on within the city and providing for the issuance of permits and the collection of fees therefore.

The City Plumbing Code shall become effective for new permit applications received by the city on or after January 1, 2023.

At least one copy of the City Plumbing Code has been deposited in the office of the City Clerk and shall be at all times maintained by the Clerk for use and examination by the public.

15.a
Packet Pg. 174
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 75 Chapter 20.02
AMENDMENTS TO CHAPTER 1, DIVISION II OF THE

CALIFORNIA PLUMBING CODE
Sections:

20.02.005 Chapter 1 Division II is Amended

20.02.010 Section 101.1 is Amended

20.02.020 Section 101.6 is Added

20.02.030 Section 103.1 is Amended

20.02.040 Section 104.3.2 is Amended

20.02.050 Section 104.5 is Amended

20.02.060 Section 104.5.2 is Amended

20.02.070 Section 104.5.3 is Amended

20.02.080 Section 107.1.1 is Added

20.02.005 Chapter 1 Division II is amended.

The following sections of Chapter 1, Division II of the California Plumbing Code, as adopted by Section 20.01 hereof, are added, deleted, or amended as follows:

20.02.010 Section 101.1 is Amended
Section 101.1 is amended to read as follows:

101.1 Title. These regulations shall be known as the Santa Clarita Plumbing Code and shall be used in conjunction with the provisions of Title 24, California Code of Regulations, mandated by the State of California to be enforced by the local building department, all of which may be cited herein as "this code."

20.02.020 Section 101.6 is Added
Section 101.6 is added to read as follows:

101.6 Work in Public Right-of-Way. No person shall install, remove, alter, or repair any sewer or part thereof which is located in any public way within the City of Santa Clarita without having first obtained all required approvals and permits from each agency which has jurisdiction over the particular thoroughfare or utility affected. Such agencies may include but are not limited to: City Engineering Services, L.A. County Sanitation District, L.A. County Sewer Maintenance District, and the State Department of Transportation (CALTRANS).

20.02.030 Section 103.1 is Amended
Section 103.1 is amended to read as follows:

103.1 General. There is established within the City of Santa Clarita, a division in the Community Development Department known as the Building & Safety Division under the administrative and operational control of the City Building Official. The City Building Official is designated as the Authority Having Jurisdiction duly appointed to enforce this code.

Whenever the term "Authority Having Jurisdiction" or "Building Official" is used in any section of this code such term shall be construed to mean the City Building Official of the City of Santa Clarita.

The Authority Having Jurisdiction shall be the authority duly appointed to enforce this code. The Authority Having Jurisdiction shall have the power to render interpretations of this code and to adopt

15.a
Packet Pg. 175
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 76 enforce rules and regulations to supplement to this code as deemed necessary in order to clarify the applications of the provisions of this code. Such interpretations, rules, and regulations shall comply with intent and purpose of this code.

The Building Official is authorized and directed to enforce all of the provisions of this code and to make inspections pursuant to the provisions of this code. For such purposes the Building Official shall have the powers of a law enforcement officer.

The Building Official shall have the power to render interpretations of this code and to adopt and enforce rules and regulations supplemental to this code as may be deemed necessary in order to clarify the application of the provisions of this code. Such interpretations, rules, and regulations shall be in conformity with the intent and purpose of this code.

20.02.040 Section 104.3.2 is Amended
Section 104.3.2 is amended to read as follows:

104.3.2 Plan Review Fees. When plans or other data are required to be submitted by Section 104.3.1, a plan review fee shall be paid at the time of submitting plans and specifications for review.

The plan review fees for plumbing work shall be as set forth and adopted by the City Council.

The plan review fees specified in this section are separate fees from the permit fees specified in this section and are in addition to the permit fees.

When plans are incomplete or changed so as to require additional review, an additional plan review fee shall be charged in accordance with the fees adopted by the City Council.

20.02.050 Section 104.5 is Amended
Section 104.5 is amended to read as follows:

104.5 Fees. The fee for each permit shall be as set forth and adopted by the City Council.

20.02.060 Section 104.5.2 is Amended
Section 104.5.2 is amended to read as follows:

104.5.2 Investigation Fees. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to twice the amount of the permit fee that would be required by this code if a permit were to be issued and shall be in addition to any fees for permits issued in connection with the work investigated. The minimum investigation fee shall be as established by the City Council. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code, nor from any penalty prescribed by law.

20.02.070 Section 104.5.3 is Amended
Section 104.5.3 is amended to read as follows:

104.5.3 Fee Refunds. The Building Official may authorize the refunding of not more than 80 percent of any fee paid hereunder, excluding issuance fees or plan review fees, when no work has been done under a pe rmit issued in accordance with this code. No refund shall be authorized except on written application filed by the original applicant or permittee not later than 90 days after the date the permit or application for permit has expired, become inactive, been cancelled, or passed a final inspection.

15.a
Packet Pg. 176
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 77 20.02.080 Section 107.1.1 is Added
Section 107.1.1 is added to read as follows:

107.1.1 Appeals. Appeals of determinations made by the Building Official for this code shall be made in accordance with Chapter 18.02 Section 18.02.190 of Title 18, City Building Code.

15.a
Packet Pg. 177
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 78 Chapter 20.03
AMENDMENTS TO CHAPTER 3 OF THE CALIFORNIA PLUMBING CODE

Sections:

20.03.005 Chapter 3 is Amended

20.03.010 Section 301.2.6 is Added

20.03.005 Chapter 3 is Amended
The following sections of Chapter 3 of the California Plumbing Code, as adopted by Section 20.01 hereof, are added, deleted, or amended as follows:

20.03.010 Section 301.2.6 is Added
Section 301.2.6 is added to read as follows:

301.2.6 Used Materials. Previously used industrial apparatus and processing equipment may be reinstalled provided it complies with all applicable provisions of this code.

15.a
Packet Pg. 178
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 79 Chapter 20.04
AMENDMENTS TO CHAPTER 7 OF THE CALIFORNIA PLUMBING CODE

Sections:

20.04.005 Chapter 7 is Amended

20.04.010 Section 714.6 is Added

20.04.020 Section 714.7 is Added

20.04.005 Chapter 7 is Amended
The following sections of Chapter 7 of the California Plumbing Code, as adopted by Section 20.01 hereof, are added, deleted, or amended as follows:

20.04.010 Section 714.6 is Added.

Section 714.6 is added to read as follows:

714.6 Water softener systems using dry wells for the discharge of effluents are prohibited in the City of Santa Clarita.

Exception: Systems with regeneration cycles discharging quantities of total dissolved solids that do not exceed those stipulated in the water quality objectives set by the Regional Water Quality Control Board when approved by the Building Official.

20.04.020 Section 714.7 is Added.

Section 714.7 is added to read as follows:

714.7 Automatic or self-regenerating water softener systems using sodium chloride (salt) or potassium chloride are prohibited in the City of Santa Clarita.

Exception: Commercially installed water softener systems that utilize portable exchange tanks maintained by a commercially licensed company where no brine waste is discharged into the public sewer system.

15.a
Packet Pg. 179
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 80 Chapters:

Title 21

CITY MECHANICAL CODE

21.01 Adoption of the City Mechanical Code

21.02 Amendments to Chapter 1 Division II, Administration

21.03 Amendments to Chapter 3, General Regulations

15.a
Packet Pg. 180
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 81 Sections:

Chapter 21.01

ADOPTION OF THE CITY MECHANICAL CODE

21.01.010 Adoption of the City Mechanical Code

21.01.010 Adoption of the City Mechanical Code.

There is hereby adopted by reference that certain code known and designated as the California Code of Regulations, Title 24, Part 4, further described and referred to as the 2022 California Mechanical Code published by the California Building Standards Commission and based on the Uniform Mechanical Code®, 2021 Edition, prepared by the International Association of Plumbing and Mechanical Officials.

The adoption of said code shall include those sections requiring enforcement by the local building department and as further amended by the City of Santa Clarita with provisions intended to address local climatic, geologic, and topographic conditions, as permitted by State law. Adoption of said code shall include the adoption of the following appendices: Appendix D, Appendix F, and Appendix G.

Such code shall become and be the Santa Clarita Mechanical Code, regulating heating, ventilating, comfort cooling, refrigeration systems and other miscellaneous heating appliances, prescribing conditions under which such work may be performed within the city and providing for the issuance of permits and the collection of fees therefore.

The City Mechanical Code shall become effective for new permit applications received by the city on or after January 1, 2023.

At least one copy of the City Mechanical Code has been deposited in the office of the City Clerk and shall be at all times maintained by the Clerk for use and examination by the public.

15.a
Packet Pg. 181
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 82 Chapter 21.02
AMENDMENTS TO CHAPTER 1 DIVISION II OF THE

CALIFORNIA MECHANICAL CODE
Sections:

21.02.005 Chapter 1 Division II is Amended

21.02.010 Section 101.1 is Amended

21.02.020 Section 103.1 is Amended

21.02.030 Section 104.3.2 is Amended

21.02.040 Section 104.5 is Amended

21.02.050 Section 104.5.2 is Amended

21.02.060 Section 104.5.3 is Amended

21.02.005 Chapter 1 Division II is Amended.

The following sections of Chapter 1 Division II of the California Mechanical Code, as adopted by Chapter 21.01 hereof, are added, deleted, or amended as follows:

21.02.010 Section 101.1 is Amended
Section 101.1 is amended to read as follows:

101.1 Title. These regulations shall be known as the Santa Clarita Mechanical Code and shall be used in conjunction with the provisions of Title 24, California Code of Regulations, mandated by the State of California to be enforced by the local building department, all of which may be cited herein as "this code."

21.02.020 Section 103.1 is Amended
Section 103.1 is amended to read as follows:

103.1 General. There is established within the City of Santa Clarita, a division in the Community Development Department known as the Building & Safety Division under the administrative and operational control of the City Building Official. The City Building Official is designated as the Authority Having Jurisdiction duly appointed to enforce this code.

Whenever the term "Authority Having Jurisdiction" or "Building Official" is used in any section of this code such term shall be construed to mean the City Building Official of the City of Santa Clarita.

The Authority Having Jurisdiction shall be the Authority duly appointed to enforce this code. The Authority Having Jurisdiction shall have the power to render interpretations of this code and to adopt enforce rules and reg ulations to supplement to this code as deemed necessary in order to clarify the applications of the provisions of this code. Such interpretations, rules, and regulations shall comply with intent and purpose of this code.

The Building Official is authorized and directed to enforce all of the provisions of this code and to make inspections pursuant to the provisions of this code. For such purposes the Building Official shall have the powers of a law enforcement officer.

The Building Official shall have the power to render interpretations of this code and to adopt and enforce rules and regulations supplemental to this code as may be deemed necessary in order to clarify the application of the provisions of this code. Such interpretations, rules, and regulations shall be in conformity with the intent and purpose of this code.

15.a
Packet Pg. 182
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 83 21.02.030 Section 104.3.2 is Amended
Section 104.3.2 is amended as follows:

104.3.2 Plan Review Fees. When plans or other data are required to be submitted by Section 104.3.1, a plan review fee shall be paid at the time of submitting plans and specifications for review. The plan review fees for mechanical work shall be as set forth and adopted by the City Council.

The plan review fees specified in this section are separate fees from the permit fees specified in section 104.5 and are in addition to the permit fees.

When plans are incomplete or changed so as to require additional plan review, an additional plan review fee shall be charged at the rate adopted by the City Council.

21.02.040 Section 104.5 is Amended
Section 104.5 is amended as follows:

104.5 Fees. The fee for each permit shall be as set forth and adopted by the City Council.

21.02.050 Section 104.5.2 is Amended
Section 104.5.2 is amended to read as follows:

104.5.2 Investigation Fees. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to twice the amount of the permit fee that would be required by this code if a permit were to be issued and shall be in addition to any fees for permits issued in connection with the work investigated. The minimum investigation fee shall be as established by the City Council. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this code, nor from any penalty prescribed by law.

21.02.060 Section 104.5.3 is Amended
Section 104.5.3 is amended to read as follows:

104.5.3 Fee Refunds. The Building Official may authorize the refunding of a fee as follows:

1. Not more than 80 percent of the permit fee, excluding issuance fees or plan review fees, paid hereunder when no work has been done under a permit issued in accordance with this code.

2. Not more than 80 percent of the plan review fee paid hereunder, when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan review effort has been expended.

The Building Official shall not authorize refunding of any fee paid except upon written application filed by the original permittee or applicant not exceeding 90 days from date the permit or application for permit expired, became inactive, been cancelled, or passed a final inspection.

15.a
Packet Pg. 183
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 84 Chapter 21.03
AMENDMENTS TO CHAPTER 3; GENERAL REGULATIONS, OF THE

CALIFORNIA MECHANICAL CODE
Sections:

21.03.005 Chapter 3 is Amended

21.03.010 Section 302.2 is Amended

21.03.005 Chapter 3 is Amended
The following sections of Chapter 3 of the California Mechanical Code, as adopted by Chapter 21.01 hereof, are added, deleted, or amended as follows:

21.03.010 Section 302.2 is Amended
Section 302.2 is amended to read as follows:

302.2 Alternate Materials and Methods of Construction Equivalency. Nothing in this code is intended to prevent the use of any material, appliance, installation, device, arrangement, or method of construction not specifically prescribed, provided any such alternate has been approved by the Building Official.

The Building Official may approve any such alternate, provided, it is determined that the proposed design is satisfactory and complies with the technical provisions of this code, and that the material, method or work offered is, for the purpose intended, at least the equivalent of that prescribed in this code in suitability, strength, effectiveness, fire resistance, durability, and safety.

Such approval shall be based upon submittal of substantiating data and including, but not limited to, performance characteristics, measurements, calculations, diagrams, equipment and construction factors, where applicable.

A written application shall be submitted for a proposed alternate material or method of construction together with a fee established by the City Council. The details of any action granting an alternate material or method of construction shall be noted in the files of the Building & Safety Division of the city.

15.a
Packet Pg. 184
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 85 Title 22

CITY FIRE CODE
Chapters:

22.01 Adoption of the City Fire Code

15.a
Packet Pg. 185
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 86 Sections:

Chapter 22.01

ADOPTION OF THE CITY FIRE CODE

22.01.010 Adoption of the City Fire Code

22.01.010 Adoption of the City Fire Code

There is hereby adopted by reference that certain code known and designated as the California Code of Regulations, Title 24, Part 9, further described and referred to as the 2022 California Fire Code published by the California Building Standards Commission and based on the International Fire Code ®, 2021 Edition, prepared by the International Code Council.

Adoption of said code shall include such amendments to the 2022 California Fire Code as duly adopted by the County of Los Angeles and referred to as Title 32 of the Los Angeles County Code, also known as the County of Los Angeles Fire Code.

Such code shall become and be the Santa Clarita Fire Code, regulating and governing the safeguarding of life and property from fire and explosion hazards arising from the storage, handling and use of hazardous substances, materials and devices, and from conditions hazardous to life or property in the occupancy of buildings and premises in the City of Santa Clarita.

The Santa Clarita Fire Code shall become effective January 1, 2023.

At least one copy of the Santa Clarita Fire Code has been deposited in the office of the City Clerk, and shall be at all times maintained by the Clerk for use and examination by the public.

15.a
Packet Pg. 186
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 87 Chapters:

Title 24

CITY ENERGY CONSERVATION CODE

24.01 Adoption of the City Energy Conservation Code

15.a
Packet Pg. 187
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 88 Chapter 24.01

ADOPTION OF THE CITY ENERGY CONSERVATION CODE
Sections:

24.01.010 Adoption of the City Energy Conservation Code

24.01.010 Adoption of the City Energy Conservation Code

There is hereby adopted by reference that certain code known and designated as California Code of Regulations, Title 24, Part 6, further described and referred to as the 2022 California Energy Code, published by the California Building Standards Commission.

Such Code shall become and be the City of Santa Clarita Energy Conservation Code, regulating the design, construction, alteration, installation, or repair of building envelopes, space-conditioning systems, water-heating systems, indoor lighting systems of buildings, outdoor lighting and signage, and certain equipment to enhance the efficiency and reduce energy use of such buildings as specifically provided for therein.

The City of Santa Clarita Energy Conservation Code shall become effective for new building permit applications received by the city on or after January 1, 2023.

At least one copy of the City of Santa Clarita Energy Conservation Code shall be maintained and kept available for reference and examination by the public at the city’s Permit Center public counter.

15.a
Packet Pg. 188
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 89 Chapters:

Title 25, Chapter 25.01

CITY GREEN BUILDING STANDARDS CODE

25.01 Adoption of the City Green Building Standards Code

15.a
Packet Pg. 189
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) 90 Chapter 25.01

ADOPTION OF THE CITY GREEN BUILDING STANDARDS CODE

Sections:

25.01.010 Adoption of the City Green Building Standards Code

25.01.010 Adoption of the City Green Building Standards Code

There is hereby adopted by reference that certain code known and designated as the California Code of Regulations, Title 24, Part 11, further described as the 2022 California Green Building Standards Code, also referred to as the 2022 CALGreen Code, published by the California Building Standards Commission.

Such Code shall become and be the City of Santa Clarita Green Building Standards Code, regulating the planning, design, operation, construction, use and occupancy of every new building or structure to ensure buildings have a more positive environmental impact and encourage sustainable construction practices as specifically provided for therein.

The City of Santa Clarita Green Building Standards Code shall become effective for new building permit applications received by the city on or after January 1, 2023.

At least one copy of the City of Santa Clarita Green Building Standards Code shall be maintained and kept available for reference and examination by the public at the city’s Permit Center public counter.

15.a
Packet Pg. 190
Attachment: 2022 SCBC Ordinance (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE) City of Santa Clarita Amendments
to the
2022 California Building Standards Code
(Title 24 of the California Code of Regulations)

Justification Key

A. This amendment is necessary for administrative clarification and does not modify a Building Standard pursuant to California Health and Safety Code Sections 17958, 17958.5, and 17958.7. This amendment establishes administrative standards for the effective implementation and enforcement of building standards as contained in Title 24 of the California Code of Regulations throughout the City of Santa Clarita.

B. This amendment is justified on the basis of a local geologic condition.

Rationale: The City of Santa Clarita is located in an area known for high seismic activity.

Both the 1971 San Fernando earthquake and the 1994 Northridge earthquake resulted in significant structural damage to buildings within the city’s boundaries. The San Gabriel fault runs directly through a portion of the city and is considered an active class ‘B’ fault. The San Andreas fault is located less than 40 miles to the east of city. The most recent U.S.

Geological Survey maps show the entire city is classified as Seismic Design Category “E”.

Additionally, many areas within the city contain expansive soils or soils with high sulfate levels which can negatively impact footing and foundation design. This local amendment is designed to reduce property damage from a major seismic event or adverse soil conditions through enhanced structural provisions and to establish criteria for repair of damaged property following such an event.

C. This amendment is justified on the basis of a local climatic condition.

Rationale: The Santa Clarita valley is surrounded by undeveloped mountainous areas on all sides. The seasonal climatic conditions during the summer and fall in this region create a severe fire hazard. Dry, hot temperatures cause natural vegetation growing in the nearby foothills and mountains to become dry and extremely combustible. In addition, unpredictable seasonal wind conditions (Santa Ana winds) prevalent in this region add to the danger of possible wild fires. Approximately one-third of the city has been classified as Very High Fire Hazard Severity Zone (VHFHSZ) as established on maps prepared by the California Department of Forestry and Fire Protection (Cal Fire). Additionally, this area can be subject to heavy rains during the winter months that can cause flooding, erosion, or slope failure in the hillside or low laying areas. This local amendment is designed to reduce the chance of a structural fire from exposure to a major wild fire through the use of enhanced fire resistive materials and construction techniques or to reduce property damage from flooding, mud slides, or slope failure during the rainy season.

D. This amendment is justified on the basis of a local topographic condition.

Rationale: The topography in and around the City of Santa Clarita consists of rugged foothills and mountainous areas. Many portions of the city border or encroach into these hillside or foothill areas. Winding access roads can make timely response by fire suppression vehicles difficult. The rugged foothills are subject to fires during the hot dry periods or mudslides and flooding during the rainy wet months. This local amendment is designed to reduce the chance of property damage caused in the event of a wild fire, flooding or mudslide.

15.b
Packet Pg. 191
Attachment: 2022 Justifications (FIRST READING OF AN ORDINANCE TO ADOPT THE 2022 CALIFORNIA BUILDING STANDARDS CODE)

SECTION TITLE/DESCRIPTION AMENDED ADDED DELETED JUSTIFICATION (see key)
101.1 Title of code as adopted at the local leve l XA
103.1 Creation of enforcing agenc y XA
105.2 Work exempted from permit X A, B
105.2.3 Repairs and maintenance X A
105.3.2 Time limitation of application X A
105.5 Expiration X A
105.5.2 Reactivation of an expired permi
t XA
105.5.3 Fees XA
105.8 Combined building permit s XA
107.1 Submittal documents X A
109.2 Schedule of permit fees X A
109.2.1 Plans examination fees X A
109.4 Work commencing before permit issuanc
e XA
109.6 Refunds X A
110.3.6 Lath, gypsum board, and gypsum panel inspection s XA 110.3.13 Reinspections X A
110.7 Construction placard and inspection record card X A 110.8 Inspections during declared emergencie
s XA
110.9 Special inspector registration X A
113.3 Qualifications X A
113.4 Filing of appeals X A
114.2.1 Recordation of Notice of Violation X A
114.2.2 Termination of Notice of Violation X A
114.4 Violation penaltie
s XA
117 Prohibited uses of building site s X A, B, D
118 Fire hazard zones X A, C, D
Table 1505.1 Minimum roof covering classification X C, D 1505.1.2 Roof coverings within all other area s X C, D
1512.2.2 Roof replacement over spaced sheathin g XB
1512.6 Inspections  XA
1612.3 Establishment of flood hazard areas X A, C, D
1613.5 Modify ASCE 7 Equation 12.12‐1 X B
1613.6 Modify ASCE 7, Section 12.2.3.1 X B
1613.7 Seismic design provisions for hillside building
s X B, D
1613.8 Suspended ceiling design X B
1613.9 Power actuated fasteners X B
1613.10 Light‐gage mudsill anchor
s X B, C
1705.3 Concrete construction X B
1805.1 Waterproofing for retaining wall
s XC
1807.1.4 Permanent wood foundation systems X B, C, D
1807.1.6 Prescriptive design of concrete and masonry foundation  wall s XB
1807.2 Retaining walls constructed of wood X B, C
1807.3.1 Wood pole foundation s X B, C
1808.7.2 Foundation setback from descending slope surfac e X B, D 1809.3 Stepped footings X B, D
1809.4 Depth and width of footing
s XB
1809.7 Prescriptive footings for light‐frame construction X B Table 1809.7 Prescriptive footings for light‐frame construction X B 1809.12 Timber footings X B
1810.3.2.4 Deep timber foundations X B
1905.1.7 Modifications to ACI 318, Section 14.1.4 X B
2304.10.2 Fastener requirements X B
2304.10.3.1 Quality of nails X B, C
2304.10.8 Framing requirements X B
2304.10.9 Nails, staples, or spikes in withdrawal X B
2304.12.2.8 Wood used in retaining walls and crib
s XB
2305.1.3 Lateral Design Standard X A
2306.2 Wood‐frame diaphragms X B
City of Santa Clarita Amendments to the 2022 California Building Standards Code (CCR Title 24) Part 2:  California Building Code (CBC)

Page 1 of 3 ends
← All documents from this meeting