1 Intro . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2 References /Relevant Experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 3 Plan of Study / Scope of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 4 Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 5 Program Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 6 Personnel, Equipment, and Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 7 Indemnity and Insurance Notice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 8 Designation of Sub-Consultants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 9 References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 10 Acknowledgment of Scope of Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 11 City of Santa Clarita Disclosure Statement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 12 Equal Opportunity / Affirmative Action Statement . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 13 Addendum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
IN PARTNERSHIP WITH
Hunsaker & Associates
Engineering | Survey
On the cover: Riding the clamshell of an Avid pumptrack, Pasco County, FL This page: Avid Trail’s Blue Steel flow trail and jump line, High Bridge, NJ 2 3
1. Introduction
Thank you for the opportunity to submit our proposal to the City of Santa Clarita for the Blue Cloud Bike Park design .
Founded in Park City, Utah in 2013, Avid Trails is
comprised of a unique team of planners, designers,
builders, hikers, mountain bikers, road cyclists, snow
sport and outdoor enthusiasts who share a passion
for providing access to great trails and recreation
opportunities . Our planning philosophy is focused on
the user experience, carefully considering the land and sensitive environmental resources, long term sustainability and deeply understanding the desires of anticipated users .
If selected, Avid Trails’ Southern California office (El Segundo) will be the prime design consultant for this assignment.
Bike T rails and Bike Park Design are What We Do Best.
With countless miles of trail planning and construction projects and an ever- expanding bike park design portfolio, the Avid Trails team is experienced in all facets of planning, design, layout, and construction of sustainable multi- use trails, mountain bike trails, pump tracks, skills trails, jump trails and other outdoor recreation amenities . Every Avid design and construction team member is a fanatic mountain biker who takes pride in creating world class riding experiences for riders of all skill levels .
The Avid Trails design team has deep experience designing bike parks and bike-optimized trails . Our design and construction menu includes pump tracks, flow trails, berms, rollers, jump lines, skills zones, skinnies, teeters, step-ups, step-downs, A-frames, wall rides, drops, rock gardens, rock armoring, culverts and bridges . In short, we love all things bike, and our design always focuses on fun .
Avid Trails projects range from small community bike parks (less than one acre) to large scale master planning and construction for projects up to 30,000 acres . We work throughout the United States including completed projects in over 15 states . As such, we have excellent experience designing and building in a wide variety of terrain and conditions .
In addition to typical trail and bike park projects, our team of talented planners and designers have created and implemented concepts for urban parks, outdoor fitness nodes, trailheads, regional multi-use pathways, tree canopy trails, zip-lining facilities, ski trails and more . Our capabilities include:
• Complete Trails Planning and Design
• GIS Services
• Trail Signage and Wayfinding Design and Installation
• Map Creation and Illustration
• 3D Rendering
• CAD and Construction Drawings
• Trail Construction
• Bike Park Feature Design and Construction
• Pump Track Design and Construction
• Trailhead Design and Construction
• Trail Maintenance Guides and Oversight
• Trail Volunteer Training
We are proud members of the Professional Trail Builders Association and the Urban Land Institute .
A Solid Partnership between Design and Engineering.
When approaching specialized projects like the Blue Cloud Bike Park, we build the right teams to deliver the expertise and knowledge needed to execute the project at the highest level .
For this assignment, Avid Trails would partner with
Hunsaker and Associates for civil engineering and
survey responsibilities, and they have demonstrated
experience and excellence with other projects for the
City of Santa Clarita and surrounding areas .
Hunsaker & Associates-Los Angeles (H&A-LA) is a
broad-based civil engineering firm which upholds the
commitment to consistent, high-quality, and competitively priced planning, engineering, and surveying services that has distinguished our parent company, Hunsaker & Associates, since its inception in 1976 . Our office in Los Angeles County is a METRO-certified Disadvantaged Business Enterprise (DBE) and Small Business enterprise (SBE), with an SBE certification also from the State of California Department of General Services . We are thoroughly versed in local codes and practices, and have extensive experience working with public- and private-sector clients throughout Southern California .
H&A provides services to both public and private sector clients, including:
local, state and federal agencies; residential, industrial & commercial land developers; water districts, municipalities; private land owners; consulting engineering & architectural firms; and contractors . The following describes our major areas of work:
Public Works Engineering Services: Since 1976, H&A has worked with both public and private sector clients to design water and wastewater infrastructure, public roadways, flood control channels and other backbone infrastructure for numerous cities projects throughout Southern California . We provide concise, cost effective, and accurate plans and reviewing of plans for public improvements to local agencies . Our capabilities include transportation infrastructure, water, sewer, and storm drain design; lift station, pump station, and reservoir design; water and sewer master planning; transportation planning and engineering; hydraulic, hydrologic and sedimentation engineering; assessment district engineering; construction engineering management; and re-development agency engineering .
Land Surveying and Mapping Services: Our survey team of licensed land surveyors, field crews, and office support personnel provide a comprehensive range of state-of-the-art surveying for our clients, combining traditional surveying techniques with advanced surveying technology . The mapping department at H&A is staffed with licensed surveyors who have extensive experience with reviewing/preparation and interpretation of legal descriptions and mapping procedures . Our field crews are staffed with Licensed Surveyors and Certified Party Chiefs with over 12 years of experience in surveying and are fully equipped with the most sophisticated survey instruments available . Some of our capabilities include boundary & property surveys; bridge, channel, street improvement, and utilities construction staking; A .L .T .A . surveys; topographic and aerial control survey; and GPS surveying .
Planning and Environmental Services: Specific plans; environmental analysis; urban design; master plans; re-use and redevelopment planning; site/ land use planning; community planning; general plans; entitlement-to-use processing; regulatory permits; and public information programs .
Governmental Relations Services: H&A’s capabilities include entitlement processing; issues management; community outreach programs; public presentations; marketing; project management; development issues and processing project coordination; and negotiations .
Related Professional Services: Computer-aided design and graphics; earthwork quantity cost estimates; cost/ quantity estimates; visual analysis and media services; graphic design and illustration; Geographic Information Systems/Land Information Systems; and Automated Mapping/Facilities Management .
The Right T eam for the Job.
We believe the team we have assembled is among the best in the business for the Blue Cloud Bike Park design . We are good listeners, solid collaborators, and are diligent about delivering excellent work on-schedule and on-budget . Most of all, we have many years of significant experience designing bike parks and mountain bike trails all over the country .
We are honored to be able to submit our proposal for this important project, and look forward to discussing the scope in detail with the City .
Hunsaker &
Associates
4 West Jordan Wheels Park Concept B (11 acres with utility easement; 6.5 acres without) FUTURE
RECREATION
CENTER
PARKING
FUTURE W 8600 FLYOVER
1 WELCOME PLAZA
MINE-THEMED PLA Y + SKILLS
BEGINNER SKILLS & DRILLS
BOWLS & FLOW
URBAN & STREET
INTERMEDIATE PUMP & FLOW
ADV ANCED PUMP & FLOW
TERRACED SEATING & PLA Y
MINE TOWER BIKE START / OVERLOOK
MTB FLOW GREEN / BLUE / BLACK
PROGRESSIVE JUMP LINES
PA VED LOOP TRAIL
PROGRESSIVE SLOPESTYLE*
MODIFIED DETENTION BASIN
* IF UTILITY EASEMENT IS A V AILABLE
1 5
9 2
6 10
3 7
11 4
8 12
13 14
5 8
6 7
10 9
13 12
12 11
14 2
4 3
WELCOME PLAZA
GUEST DROP -OFF
FOOD TRUCKS
ADA PARKING
LIMITED PARKING
MINE-THEMED
PLA Y + SKILLS
CHECK IN
RENTALS
INFIELD ISLANDS
FOR VIEWING AND
HANGING OUT
DRAMATIC “OPEN
PIT” TERRACES
FOR SEATING,
RIDING AND PLA Y
ICONIC “MINE TOWER”
BIKE START + VIEWING,
OBSERV ATION
HIGH POINT OF SITE
12 West Jordan Wheels Park
West Jordan, UT
Avid Trails Design
Project Size: 11 Acres
Completed: 2021 (Design)
Avid Trails was selected to do the conceptual
design for this major public bike and skate park in
the Salt Lake City valley . We tapped into the local
open-pit mining culture and created an iconic
playground that utilizes terraced forms and mining-
themed features . City officials were delighted with
the concept, and are approaching the local mining
operations for co-branding and funding of the
project .
WEST JORDAN
WHEELS PARK
WEST JORDAN
WHEELS PARK
2. Relevant Experience
Orem Bike Park
City of Orem, UT
Bexley Bike Park
Land O’ Lakes, FL
Tail Mark Bike Trails
Jacksonville, FL
Wendell Bike Trails
Wendell Falls, NC
The following pages feature Avid Trails mountain
bike design and build projects from coast to coast .
We have the unique advantage of creating trails
and bike parks all across America, so we are on top
of trends and riding styles that inform our design
process .
Although we understand the Blue Cloud Bike Park
is a design-only assignment, we often build the
trails and bike park features we design, so we have
vast experience in understanding what is feasible,
sustainable, and right for the designated trail type .
This means design recommendations are not just
lines on paper– we know they will actually work .
Corner Canyon Bike Trails
Draper City, UT
OAKLEY TRAIL PARK
LOWER
RODEO
NORTH
BUCKAROO
BUCKAROO
CONNECT
JUMP
LINE
SKILLS
TRAIL
UPPER
RODEO
UPPER LARIAT
LOWER LARIAT
LOWER LARIAT
OAKLEY
TRAIL
THESE TRAILS ARE OWNED BY OAKLEY CITY ,
BUT OPEN TO THE PUBLIC FOR NON-MOTORIZED USE
BARREL RACER
LARIAT
CONNECT
Multi-Use T wo-Way Trail
Bikes Only T wo-Way Trail
Beginner One-Way Flow
Bikes Only
Intermediate One-Way Flow
Bikes Only
RULES AND REGULATIONS • USE TRAILS AT YOUR OWN RISK
1. Please obey all signs and regulations including
directional and specific trail usage.
2. BIke riders must wear helmets.
3. Please respect the land owner and stay on trails.
4. Be courteous to other trail users, including
horses, runners, hikers, etc.
5. Pets must be on leash. Owners must pick up
and remove all pet waste.
6. Horses may use Lariat Loop, but please use road
for access to Seymore Canyon and Oakley Trail.
7. DO NOT USE TRAILS WHEN WET . Riding muddy
trails causes serious damage to the trail surface.
PUMP
TRACK
Oakley Trail Park
Oakley, UT
Avid Trails Design + Build
Project Size: 40 Acres
Completed: 2019
Public Agency Review: City of Oakley,
US Forest Service
Our team worked with South Summit Trails
Foundation to design and build Oakley Trail
Park . The park features a variety of fun and
challenging trails for mountain bikers of all
levels . Tame and twisty Buckaroo teaches new
riders the art of flow, while Rodeo and Barrel
Racer give advanced riders a real treat .
High Bridge Flow Trails
High Bridge, NJ
Avid Trails Design + Build
Project Size: 3 Miles
Completed: 2021
Public Agency Review: Borough of High Bridge,
NJ Water Supply Authority
Avid Trails partnered with the Borough of High Bridge, NJ, JORBA and local advocates to plan, design and build the state’s first mountain bike designated trails on public land .
We developed a concept plan, presented to town council for approval, obtained funding through JORBA, raised additional funds then completed construction . A little over a year later and this little trail system is quickly becoming one of the most popular in New Jersey for riders of all ability levels . 5 Westlake Family Bike Park
Loxahatchee, FL
Avid Trails Design + Build
Project Size: 1 .5 Acres
Completed: 2019
This 1 .5 acre bike park features a beginner pump
track oval, an intermediate-advanced pump track
with multiple lines and options, a progressive jump
line, and a fun and challenging skills loop encircling
the park .
5 10
5 9
7 3
8 5
4 1
2 3
55 3
6 Wooden Double Roller1
Wooden Zig Zag Bridge6
Progressive Drop Zone7
Wooden Clamshell2
Logover Pyramid8
Progressive Skinnies3
Progressive Jump Line9
Rock Garden4
Rock Over10
Earthen Rollers into Banked Berm5
Family Bike Park | Westlake West Palm Beach, FL | January 26, 2018
SKILLS LOOP
BIKE TEETER
LOW BRIDGE
CLAMSHELL
SKINNIES
ROCK GARDEN
PROGRESSIVE
JUMP LINE
ELEV ATED
10’ MOUND
ELEV ATED
START MOUND
SHADE PA VILION
BIKE RACKS
WORK STAND
ADV ANCED
PUMP TRACK
SHADE
PA VILION
BEGINNER
PUMP TRACK
40 FEET
N
Twining Valley Bike Park Conceptual Plan
Upper Dublin, PA
Avid Trails Design
Project Size: 81 Acres
Completed: 2021 (Design)
Upper Dublin’s planning and engineering firm hired us to help plan and design a 2-mile multi-use single track trail system on a former municipal golf course property that is being converted to a public park .
Working with the engineers, our team designed a fun, sustainable and progressive trail that will appeal to both bikers and hikers . It was critical to be mindful of the environment so we worked closely with the team to respond to Pennsylvania Department of Natural Resources requirements for erosion and sediment control, storm water management, sensitive environment and species avoidance and so on .
Our team also met with community members including the local NICA teams to understand their needs and wishes for the new trail . This lead to the inclusion of progressive skill building features as alternate lines throughout the 2-mile loop . Construction is slated to begin in Summer of 2022 and when completed will fill a significant void in the regions trail and MTB infrastructure . 6 Veramendi Mountain Bike Park
New Braunfels, TX
Avid Trails Conceptual Design
Project Size: 27 Acres
Completed: 2019
Veramendi is a large-scale residential community located near the Guadalupe River about an hour south of Austin TX .
A significant watershed runs through the community, and it has been designated as public opens space . We were asked to create a trails master plan for the overall community, including conceptual plans for an Avid-designed Mountain Bike and Adventure Park located in the watershed . The varied topography allows for nearly five miles of bike optimized trails, including beginner, intermediate and advanced flow and XC options .
DISK GOLF
BIKE PA VILION
INTERMEDIATE
FLOW
ADVENTURE PLA Y
BEGINNER FLOW ROPES COURSE
PUMP TRACK
TABLE TOPS, ROLLERS
ZIP LINE COURSE
XC TRAIL BERMS, CLAMSHELLS
BERMS AND
ROLLERS
SKINNIES AND
ROCK GARDENS
DROPS AND
JUMPS
SKILLS
FEATURES
Veramendi Adventure Park New Braunfels, TXMountain Bike & Adventure Zone 0’ 400’200’
Multi-Use Path
XC & Hiking Trail
Alternative XC Skills Trail
Intermediate Flow Trail
Beginner Flow Trail
Return Trail
MOUNTAIN BIKE
PLA YGROUND
DISC GOLF
COURSE
COMMERCIAL
ZIP LINES
ADVENTURE
PLA Y COMMERCIAL
ROPES COURSE
7 GREEN SKILLS TRAIL
BLUE INTERMEDIATE TRAIL
BLACK ADVANCED TRAIL
PUMP LINE
BIKE FEATURE
NOREM BIKE SKILLS TRAILS PARK
SKILLS TRAILS ARE FOR BIKES ONL Y • DO NOT RIDE TRAILS WHEN WET RULES AND REGULATIONS • USE TRAILS AT YOUR OWN RISK
1. Please obey all signs and regulations including
directional and specific trail usage.
2. Riders must wear helmets.
3. Please respect the land owner and stay on trails.
4. Be courteous to other bikers.
5. No overnight camping in the park.
6. No vehicles or horses allowed in the park.
7. Dogs are not allowed on trails.
8. No alcoholic beverages or smoking allowed,
including e-cigarettes.
9. No fireworks, fires, or golfing allowed.
10 Park is closed from 11:00 p.m. to 5:00 a.m.
11. T o report concerns/vandalism contact
Public Safety 801-229-7100.
BIKE SKILLS
PLAYGROUND
EAST
TRAIL HEAD
STEP-UPS
SKINNY BRIDGE
BRIDGE
LOG-OVER
DROP ZONE
DOUBLE
ROLLER
BOULDER
ROLL-OVER
SPEED ROLLERS STEP-UPS
ROCK
GARDEN
PUMP LINE
JUMP
JUMP
DROP IN
DROP
DROP
DROP
WEST
TRAIL HEAD
Orem Bike Skills Park
Mt Timpanogos Park, Orem UT
Avid Trails Co-Design + Build
Project Size: 4 Acres
Completed: 2020
The Orem Bike Skills Park features beginner, intermediate and advanced mountain bike trails in a compact, easy to navigate environment . It’s progressive design and obstacles allow for new riders to hone their skills safely .
It’s also a ton of fun .
The Avid team built flow trails, linear pump line, skills zone and all features along the way, including installations of timber and stone . We also designed and installed informative trail signage that identifies trail types and level of rider experience needed .
Gateway Flow Trails
Travelers Rest, SC
Avid Trails Design + Build
Project Size: 4 Acres
Completed: 2021
Public Agency Review: Greenville County, Upstate SORBA
Just an hour from Asheville, NC, Travelers Rest is poised to become one of the Upstate region of South Carolina’s mountain biking hot spots .
The Avid Team was engaged by Greenville County and
Upstate SORBA to re-imagine the existing jump trails into a sustainable and progressive riding experience . Our design included a beginner jump trail, and a “dark blue” intermediate to advanced trail with larger berms, table tops, step-ups, step downs and rollable doubles . The construction process included installation of drainage culverts, stockpiling clay cap dirt from the old lines, importing roughly 460 tons of dirt, and re-naturalizing the old decommissioned trails .
8 Selected list of Avid T rails Planning, Design and Build Projects Armstrong Trail, Park City, Utah
Planning, design and construction of multi-use
backcountry trail connecting city and Silver
Star area to the Mid-Mountain trail . 4 .3 miles .
Avenues Trail, Park City, Utah
Field design and construction of multi-use
singletrack trails within subdivision’s open
space . Approximately 2 miles .
Bexley, Land O’ Lakes, Florida
Planning, design and construction observation
of multi-use trails . Approximately 10 miles .
Blackhawk Ranch, Park City, Utah
Planning and construction of multi-use trail
system through open space areas within hillside
development . Approximately 5 miles .
Bonneville Shoreline Trail, Salt Lake City,
Utah
Design and construction of trail re-route for
mountain bikes and multi-use .
The Canyons Resort, Park City, Utah
Design and Construction of several non-
motorized trails, connecting the system to other
public trails .
Approximately 7 miles .
The Colony Development, Park City, Utah
Construction of several private ski trails for
various lots within the development .
Deer Valley Resort, Park City, Utah
Design and construction of three soft-surface
trails in the resort connecting existing trails,
providing additional lift-accessible alternatives,
and differing experiences . About 3 .5 miles .
Draper City Trails, Draper, Utah
Construction of Achtung Baby, singletrack
mountain bike flow trail, approx 3 miles .
Flow Trail, Oskar Blues Reeb Ranch,
Hendersonville, North Carolina
Design and construction of advanced mountain
bike flow trail for Oskar Blues Brewery Bike
Park .
Flying Dog “IMBA Epic” Trail,
Park City, Utah
Field design and construction of extensive
public trail network through private
development . Approximately 8 miles .
Ghost Falls Trail, Draper City, Utah
Field design/layout and construction of multi-
use natural surface trail in City’s Corner Canyon
recreational area . Work included construction
and installation of four bridges . Approximately
1 .25 miles .
Glenwild, Park City, Utah
Design and construction of multi-use
trail system within private community .
Approximately 3 .5 miles .
High Bridge Pump Track, High Bridge, NJ
Design and construction of family bike park .
Lehi MU Trails, Lehi, Utah
Design and construction of multi-use flow trails
and climbing loops . Approximately 4 miles .
Oakley Bike Park, Oakley, Utah
Design and construction of mountain bike
park, including flow trails and climbing loops .
Approximately 3 miles .
Orem Bike Park, Orem, Utah
Design and construction of mountain bike
beginner skills trail including features and
obstacles .
Park City Mountain Resort, Park City, Utah
Design and construction of “Mojave” trail within
resort . Approximately 2 miles .
Pinecone Ridge Connector Trail, Park City,
Utah
Design and construction of multi-use
backcountry trail connecting Mid-Mountain
Trail to the Wasatch Crest Trail, and continuing
the Armstrong Trail . Approx . 4 miles .
Designated an IMBA “Epic” trail .
Red Ledges Trails, Heber City, Utah
Design and construction of community multi-
use trails for upscale residential community .
Approx 3 miles .
REEB Ranch, Hendersonville, North
Carolina
Planning, design and construction of mountain
bike flow trails within bike park .
Snowbird Resort, Snowbird, Utah
Design and construction of mountain bike trail
for Specialized Bicycle Company conference
and testing . Design and construction of multi-
use natural surface trail, along with multiple
drainage crossings, through rocky and steep
terrain . Approximately 7 miles .
Solitude Mountain Resort, Utah
Field design and construction of “Queen
Bess” mountain bike trail within resort .
Approximately 4 miles .
Suncrest Development, Draper, Utah
Creation of trails master plan, plus design and
construction of natural surface trails in and
around major development . Approximately 5
miles .
Summit Park, Park City, Utah
Planning, field design, and construction of over
four miles of multi-use natural surface trails in
varying terrain and soils, including areas of very
steep and rocky terrain .
Talisker, Deer Valley, Utah
Field design and construction of multi-use trail
within the Tuhaye Development near Kamas, Utah .
Approximately 3 miles .
Victory, Buckeye, Arizona
Construction of multi-use trail system within
private community . Approximately 3 .5 miles .
Victory Ranch Club, Francis, Utah
Design and construction of various multi-use
and mountain bike flow trails within private
development . Approx . 7 miles .
Westlake Bike Park, West Palm Beach, Florida
Design and construction drawings of family bike
park for .
Wendell Falls, Raleigh, North Carolina
Design and construction of cross country and flow
trails for mountain bikes and multi-use . About 5
miles .
Wolf Ranch, Georgetown TX
Planning , design and construction of multi-
use trail system within private community .
Approximately 3 .5 miles .
ENGINEERING
1. Santa Clarita Sports Complex Expansion – Phase 4
The project consists of expansions to the City’s existing Sports Complex, including: new skate park, additional balls fields, tot lot, a LEED Certified “Silver” gymnasium, parking lot, and trails on approximately 34 acres .
H&A LA’s involvement in the Sports Complex Expansion included studies to eliminate an existing, large debris basin, hydrology study, rough grading plan, grading phasing plan, precise grading, storm drain plan (public and private drains), demolition plan, utility plan, USMP report, easement quitclaims and dedications .
ENGINEERING
2. Santa Clara River Trail, Santa Clarita, CA
Project includes approximately 2 miles of Class 1 River trail from Bouquet Canyon Road to Golden Valley Road along the Santa Clara River in northern Los Angeles County . This trail project includes bike, pedestrian, and equestrian components and also a trailhead .
Trail design included a pedestrian bridge over a 10-foot diameter DWP water pipeline, as well as under crossings at the Bouquet Canyon Road and Golden Valley Road bridges . Approximately one mile of the trail has been constructed to date .
ENGINEERING
3. West Creek County Park, Valencia, CA
This project consists of an approximately 17-acre public park with basketball courts, tot lot, amphitheater, restroom facility shade structures, parking lot, par course, and trails . H&A LA’s involvement in the project included precise grading, onsite utilities including storm drain, hydrology, driveway improvements, and sewer connection .
SURVEYING
4. Via Princessa Median
Improvements, Santa Clarita, CA
Project consisted of median
improvements for Via Princessa
from SR14 to Sierra Highway . The
work included design survey,
median plans, traffic control plans,
and Caltrans permits . Hunsaker
also prepared cost estimates and
specifications for use by the City .
SURVEYING
5. Extension of Newhall Ranch Road
Cross Valley Connector
City of Santa Clarita
Newhall Land
This project included approximately 2 miles
of roadway, storm drain, and street lighting
design for a 6-lane major thoroughfare,
including raised median and Class I bike
lane . Design is 100% complete . One-
mile roadway is completely built and the
remainder has been graded . Hunsaker also
prepared legal descriptions and recorded
road deeds for one-mile of the roadway (the
remainder was dedicated on a tract map) .
Hunsaker & Associates Previous Work for City of Santa Clarita 9 1 2
4 3
5 10
TASK 1: PRELIMINARY INVESTIGATION
3. Plan of Study / Scope of Work
The following pages outline our proposed tasks and
approach for this assignment .
Task 1.1
PROVIDE DESIGN SURVEY AT JOINS, CROSSINGS
WITH EXISTING FACILITIES, POTHOLE, OR AS
REQUESTED BY THE CLIENT
Subtask:
Our team will conduct a field survey at all locations and evaluate all components in accordance with the current
standards including California Manual on Uniform Traffic Control Devices (MUTCD) standards, Caltrans Standard
Specifications, Los Angeles County Department of Public Works, and Standard Specifications and Plans for Public Works Construction (Green Book), and City Standards .
We will field locate existing facilities, trees, and ground elevations in the vicinity of the proposed improvements .
Improvements not within the limits of work or not critical to the project design will not be field located . Coordinate system to be based upon City specified control and datum (if required) .
Output:
Field surveyed data added to the aerial topography base sheets .
Task 1.2
RESEARCH AND REVIEW EXISTING DOCUMENTS
FROM THE CITY AND OTHER AGENCIES THAT MA Y
IMPACT WORK
Subtask:
Research and review existing record drawings and
documents from the City of Santa Clarita, utility
companies and agencies, Los County Department of
Public Works, and Los Angeles County Flood Control
District for the project site and adjacent improvements that may be impacted by the work .
Request Floodway Mapping for Haskell Canyon from
the City of Santa Clarita and Los Angeles County Flood
Control District .
Request documents from all known utility providers in
the area requests will be made regardless of any physical evidence of facilities .
Request documents from any additional utilities located visually or Title search .
Output:
The information collected from this research will be
applied to areal map and also will be used for design
purposes .
Task 1.3
PERFORM TOPOGRAPHIC SURVEY
AND RECORD RIGHTS OF WA Y
Subtask:
Perform Aerial and Field Topographic Survey and plot
Record Rights of Way and Easement Mapping (assumes
8 easements) to establish the Project Boundary and
constraints Available and / or known control will be
compiled and provided to the City for use in determining the desired control .
To provide complete coverage for the design flexibility an Aerial Topographic map will be prepared in 100 scale and supplemented with field survey as needed . The Aerial topography will be flown at a height equal to 1”=100’
scale mapping consistent with National Map Accuracy
Standards .
The aerial topography will be prepared by RJ Lung and
Associates .
Title Report for the site to be provided by the City or ordered by the Consultant and invoiced to the City as a reimbursable expense .
All mapping will be based upon available Record Data . A Record of Survey is not included in this scope of service .
Control research will be limited to publicly available City and County data . Survey will be based on US State Plane NAD 1983, , NAVD 1988 US .
Output:
1”=100’ scale Topographic Map with 2’ contours in flat
areas and 5’ contours in sloped sections .
Color Digital Orthophotos at 0 .5’ GSD
Task 1.4
PROVIDE MAP OF EXISTING CONSTRAINTS,
IMPACTS TO DESIGN, AND POSSIBLE SOLUTIONS
Subtask:
Prepare a Composite Site Constraint Map
showing topography, existing facilities,
mapped easements and parcel lines, flood
plain limits, and jurisdictional lines .
The following assumptions were made in
developing the scope for this task:
A . The plan will include the size, type,
material, ownership, vertical data (where
available), and data source (i .e . field located,
plan, unknown, etc .) of the existing utilities .
B . Proposed (future) utilities will be included,
if known .
C . Existing parcel and easement lines .
D . Jurisdictional Resource lines Provided by
City
E . Published flood lines (FEMA, County ML)
provided by the City or County .
F . All data will be based upon information
developed under other tasks included in this
proposal .
G . Oak trees will only be identified if they are
within the work limits .
H . Flood limits will be provided by the City
or County - separate flood analysis is not
included in this Scope of Work .
I . Environmental constraints, oak trees, and
jurisdiction limits will be provided by the City .
Output:
Composite Utility Plan (in color)
Task 1.5
PERFORM THOROUGH SITE VISIT
AND FIELD STUDY
Sub-Task:
Over the course of this scope, the Avid Trails team will spend up to 15 days in the field with boots on the ground performing an extremely thorough site study, and
ultimately field-fitting trails and features . This essential process enables us to understand the terrain, identify
SITE REPORT: OPPORTUNITIES AND CONSTRAINTS
Our data analysis and site study observations come together to create useful Field Reports to begin the trails planning process. trail opportunities and constraints, and pick out the ideal locations for trail types and features .
During this field study, we meticulously record data
including GPS waypoints, photos and field notes that are then compiled into a site report .
Perform site visits to become familiar with the existing site conditions . Take photos and measurements of the site and surrounding condition . We have visited the site prior to preparing the proposal and are familiar with the site .
For Hunsaker & Associates, the following assumptions
were made in developing the scope for this task:
A . A total of four (4) site visits are anticipated for this project .
B . One site visit will be made prior to starting the project design after completion of the data collection and review .
C . One site visit will be made during the Preliminary
Engineering Phase .
D . One site visit will be made to the site to review the proposed improvements with the site conditions .
E . One additional visit is included for as needed site meetings .
Output:
The data collected in the field including GPS tracks and waypoints, photos and/or video will be analyzed and
expressed in a Site Report prepared by Avid Trails . This report will used for discussion of field conditions and observations with client team, as well as form the basis for trails and bike park planning .
Task 1.6
PREPARE QUANTITY AND COST ESTIMATE
FOR ALL CIVIL IMPROVEMENTS
Subtask:
Consultant will prepare and provide quantity and cost
estimate based on the following assumptions:
A . Hard cost unit prices will be based upon current bids and pricing available to Hunsaker, or data provided by
City of Santa Clarita .
B . Soft costs can be included as an estimate, including consultant services and permitting . Soft costs will be based upon currently available data and may be subject to changes due to future market and regulatory conditions .
Output:
Quantity and Cost Estimate
Task 1.7
PROVIDE POTHOLE DATA AT LOCATIONS
REQUIRED FOR DESIGN OR CONSTRUCTION
Subtask:
Pothole and survey the exposed utility lines to capture the vertical and horizontal alignments, as well as any
identified crossings of the proposed utilities with existing facilities . The potholing locations will be surveyed and plotted/mapped on the Constraints Map .
These services will be performed by Boudreau Utility
Locating .
Output:
The potholing locations will be surveyed and plotted/
mapped on the Constraints Map .
Task 1.8
COORDINATION WITH UTILITY COMPANIES
Subtask:
Coordination and communication with utility companies
and other agencies (as required) to identify design
controls and considerations necessary for design .
Output:
We will coordinate and communicate with all utility
companies and other agencies as necessary .
Task 1.9
PROVIDE ENGINEERING SERVICES RELATED TO
RESEARCH OF UTILITIES, EASEMENTS, ROWS AND
PRIVATE PROPERTY LINES
Subtask:
Research and obtain existing and record drawings for
the project site and adjacent improvements that may be impacted by the work .
Plot any parcels or easements at or near the project limits and any other features that would impact the construction work and future operation of the trail system . The parcels and easement(s) will be plotted on the Constraints Map .
The following assumptions were made in developing the
scope for this task:
A . Assumes up to eight (8) parcels and/or easements with clearly written legal descriptions will be plotted .
B . All plotting will be based upon Record Data . No
Boundary Survey nor Record of Survey will be performed .
C . Parcels and easements adjacent to the site but not
affecting the improvements will be plotted approximately if possible, based upon LA County Assessor GIS data, or not plotted at all .
D . The City will provide any available data regarding
known easements, parcel data, covenants, or restrictions covering the property .
E . Southern California Edison (SCE) Transmission lines and easements are adjacent to the site .
F . A Basic Preliminary Title Report will be provided by the City or ordered and invoiced as a reimbursable expense by the consultant .
G . If large or complicated parcels, easements, and
encumbrances exist, the mapping cost may increase .
Output:
Plot existing easements on the base mapping for the site .
Task 1.10
MAP EXISTING UTILITIES
Subtask:
The plan will include the size, type, material, ownership, vertical data (where available), and data source (i .e . field located, plan, unknown, etc .) of the existing utilities .
Proposed (future) utilities will be included, if known .
Output:
The plan will include the size, type, material, ownership, vertical data (where available), and data source (i .e . field located, plan, unknown, etc .) of the existing utilities .
Proposed (future) utilities will be included, if known .
T-Bone Ridge is
excellent for shorter
loops with a wide
variety of trail styles
and difficulty
Good area for
this proposed
flow trail and
potentially others
McDowell Mountain Regional Park | Observations & Opportunities Hills north towards
Lousley Hill have
excellent XC and
DH potential
Hills west of
Long Loop have
excellent XC and
flow potential
Bike park location
shown on 2019 Plan
may be too far from
parking lot
Consider more
bike park features
closer to parking
for family fun
Consider asphalt
for pump track:
more fun with less
maintenance
Design bike park
for all abilities:
beginners can have
fun and progress;
experts can be
challenged again
and again
Consider public
input to create proper
mix of riding styles:
XC / DJ / Freeride /
Slopestyle /
Tech / Flow / Skills
Parking wayfinding
is challenging for
first timers
MTB Race and
Trail Race Event
parking at Four Peaks
staging area is ideal
Current trail
wayfinding is a good
start, but some signs
are difficult to read
at speed
Trails at either
ends of parking lot
require better
wayfinding
Shade structures
are useful, good
connection to
restrooms, but lacking
trailhead experience
and information
Wash conditions here
might prevent
sustainable bike
park features
Mountain bike trails inventory map for City of Scottsdale identifies opportunities and constraints for future trails planning. 11 Task 2.1
CREATE PROJECT DEVELOPMENT TEAM
Subtask:
Consultant shall develop a Project Development Team
(PDT) . Members of the PDT shall include consultant and sub-consultants as required by the City and other agency representatives as necessary .
Output:
Our project team is described throughout this document, particularly in section 6 .
Task 2.2
SCHEDULE AND CONDUCT MEETINGS
Subtask:
Consultant shall schedule and conduct one kick-off
meeting, monthly progress meetings, and provide written minutes to attendees and project team for each meeting .
Output:
Our team will schedule and attend project meetings with City of Santa Clarita, other Agencies, and sub-consultants as necessary . All virtual meetings will be held utilizing Microsoft Teams or zoom . Minutes of all meetings will be distributed to City and PDT .
Task 2.3
DEVELOP AND MAINTAIN PROJECT SCHEDULE
Subtask:
A project schedule shall be developed by the Consultant for design, and shall be provided to the City in both digital and hard copy . An updated schedule shall be distributed during the PDT Meetings . The project schedule shall be divided into tasks and subtasks in full detail including, but not limited to, City functions timeline, critical path, and other outside sources such as agency approvals or utilities .
The schedule shall indicate anticipated durations for all tasks .
Output:
We will produce and maintain a project schedule, and
reference this schedule at each City meeting .
Task 2.4
WORK WITH THE CITY TO OBTAIN ALL RELEVANT
INFORMATION NEEDED TO COMPLETE THE
DESIGN AND OBTAIN FINAL APPROVALS
Subtask:
Consultant shall work with the City to obtain all relevant information needed to complete the design and obtain
final approval .
Output:
Our entire process involves collecting data and reviewing and updating work at key stages with City . This is an
ongoing process throughout the assignment .
Task 3.1
PREPARE UTILITY NOTIFICATION LETTERS
Subtask:
Prepare notification letters for all known utilities and easement holders in the project area . Copies of the
Concept and Final Plans will be submitted for approval
to those utilities affected by the proposed project . Non- interference letters will be obtained for those utilities and easement holders who are impacted by project
implementation .
Output:
Create and publish utility notification letters . Does not include postage .
Task 3.2
PREPARE MATRIX OF UTILITY COORDINATION
Subtask:
Prepare matrix of utility coordination contacts and
responses for the project .
Output:
Deliver utility coordination matrix in .xl and .pdf formats .
Task 3.3
PREPARE A FUNCTION DIAGRAM TO
ILLUSTRATE GENERAL SITE ARRANGEMENT
Subtask:
Following the kickoff meeting between the consultant
team, City representatives and other project stakeholders, we will prepare a high-level Function Diagram (also known as a “Bubble Plan” over the existing conditions map . The purpose of the Function Diagram is to show potential site elements, to scale, as simplified forms . The plan helps us study spatial relationships among site elements and how they fit on the site, and will facilitate early conversations about the site’s programming before starting detailed
design work . Feedback from the City and project
stakeholders at this stage will be instrumental in helping guide the project’s direction .
Output:
One Function Diagram, illustrated over the existing
conditions map, at a scale appropriate to show the required level of detail . The plan will be rendered and annotated on a 24”x36” sheet, and delivered in electronic ( .pdf) format .
Task 3.4
DESIGN UP TO 15 MILES OF MOUNTAIN
BIKE-OPTIMIZED TRAILS
Sub Task:
We begin the design process by establishing high level
vision and programming goals with the client team . At
this stage, we identify and articulate trail types, degree of difficulty, desire for natural and built features, and the general tone and vibe of each trail . These goals and expectations are critical to the design of the overall trail system .
We then set up project files and synthesize the
data captured during the Preliminary Investigation
phase outlined in Task 1 . Our team works in the GIS
TASK 2: PROJECT MANAGEMENT
TASK 3: DESIGN
West Jordan Wheels Park Conceptual Design
2/2/23
Overall Park Concept Diagram
WEST JORDAN WHEELS PARK
NORTH 0
SCALE: 1"=30'-0"
603015 1/24/23BASE MAP
WATER SURFACE ELEVATION
FUTURE PARKING /
RECREATION CENTER
North 120 ft600
1” = 30’-0”
30 Parti Diagram
Section A
Section B
A typical Avid functional diagram identifies key use zones and establishes priorities before heading into actual design. 12 13
environment, so all available data is carefully analyzed including topo, slope, soils, vegetation, drainages,
watersheds, and other geological features . We also identify all potential constraints, including property lines, utilities, easements and ROWs . This desktop process allows us
to set the stage and understand the opportunities and
“guardrails” for proper trail planning .
Armed with geo-referenced maps and data, our team will
then conduct a thorough field study to inform us what is possible in the space . We believe the design should be an integral part of the landscape, not imposed upon it, and the land will teach us what is appropriate . During the field study, our team will capture geo-referenced photography, way-points, field observations, positive and negative
control points and more . Having explored the field and studied the data, we now begin detailed planning of trail types and alignments . Designing trail types for different rider abilities requires strict adherence to slope and
trail feature parameters . For example, when designing a beginner flow trail, we might aim for an average target grade of 5%, smaller turn radii to control speed, smooth rollers with moderate opportunities for jumps, and a
relatively smooth tread . Intermediate to advanced flow might steepen to 8% or more average running grade, with more options for tables, doubles, hip jumps, and faster, sweeping berm turns . An expert tech line might include short sections of 20% or more, with carefully-crafted
armored faces and rock gardens to minimize erosion .
While the science is critical, there is a tremendous amount of art that goes into trail design . We believe our decades of trail building and mountain bike riding experience goes a long way to delivering plenty of stoke .
We will then prepare maps with recommended trail
alignments to review with the client team, and discuss
pros, cons and options . Revisions to alignments and maps follow accordingly .
Once the conceptual trails have been approved by the
client team, we head back into the field to ground-truth all alignments . On the ground, we fine-tune routing
to maximize natural features and control points, and
minimize potential hazards and erosion . This step
includes geo-referencing the final proposed alignment in the field, and properly flagging of trail routes for future construction .
In our humble opinion, the trail planning required for
Blue Cloud Bike Park cannot be accomplished with only
a computer or high level site visit . Every trail needs to be carefully considered in the field by a qualified trail designer who understands not only what riders and users desire but what it takes to construct modern, sustainable natural surface trails . As members of the Professional Trail Builders Association with hundreds of miles of
trail construction under our belts and multiple licensed landscape architects on staff we feel our firm is uniquely qualified for the assignment .
Output:
Our trail design philosophy focuses on two essential
elements: (1) properly shedding water so trails are
sustainable and long lasting, and (2) providing maximum fun for the rider .
Avid Trails has significant experience designing natural surface trail systems, and particularly bike-optimized
trails . Although we understand the Blue Cloud Bike Park is a design-only assignment, we often build the trails we design, so we have unique experience in understanding
what is feasible, sustainable, and right for the designated trail type . This means alignment recommendations are not just lines on a map– we know they will actually work .
As referenced in the task section above, our output at
this stage will be revised ground-truthed trail alignments that are feasible to construct in a sustainable manner
that meets project/user goals . These alignments will
be delivered in PDF and GIS formats with appropriate
flagging in the field .
All drawings shall be created using AutoCAD and an
electronic copy of all drawings shall be submitted to the City in .dwg, .pdf, and .shp formats .
Task 3.5
DESIGN OF A DIRT JUMP COURSE
WITH WOOD RAMPS
Sub-Task:
After confirming the viability of the suggested dirt jump course location, our team will begin inventorying what dirt jump spots exist currently in the local and regional market .
This allows us to understand what gaps exist in the market for skill level, trail style, build quality, accessibility and so on . Concurrently we will work with expert consultant Ryan Howard (or comparable pro-level rider consultant)
to gather pro-rider level input on the dirt jump course program . From there our design team will generate a
layout and proposed lines for the dirt jump area including all appropriate skill levels and jump styles . This will include locating and specifying wood/metal ramps as a
component of the course .
Output:
This task will result in a PDF enlargement of the
proposed dirt jump course for review by the client and
key stakeholders . GIS or CAD based plans will also be
available at this stage .
All drawings shall be created using AutoCAD and an
electronic copy of all drawings shall be submitted to the City in .dwg, .pdf, and .shp formats .
Task 3.6
DESIGN OF BEGINNER AND EXPERT
ASPHALT PUMP TRACKS
Sub-task:
Our team will begin by assessing the City’s proposed
asphalt pump track locations to determine if this program element fits properly in that area . Once a final location is determined we will development overall footprints
for the two tracks based on site conditions then begin
developing schematic design concepts for review with
the City and key stakeholders . Our team along with Ryan Howard (or comparable pro-level rider consultant) will
work to develop pump track concepts that create a unique and memorable experience . We will look closely at track Spanish Peaks Summer Trail Planning
2/10/2023
Proposed Summer Trails System
Previously planned trail
connection to Y ellow Mule Trails
Equestrian trailhead
(per BSCO Trail Plan)
Proposed Major
Trailhead (Parking)
Proposed Minor
Trailhead (No Parking)
Proposed Signed Trail
Access Point
Major Trailhead
Picnic Area/Overlook
Campsite
Comfort Station
Recreation Area
Proposed Multi-Use Trail
Proposed Mountain Bike
Optimized Trail
Proposed Equestrian
Trail
Proposed Community
Path
Existing Multi-Use Trail
Existing Mountain Bike
Optimized Trail
Existing Community
Path
Existing Dirt Road
Golf Cart Paths
Big Sky Resort Ski Lifts
Spanish Peaks Boundary
Parcel Boundary
Easement
Waterbodies
Wetlands
Golf Fairways
Development Area
Contours (10 ft)
Legend
North 2,000 ft1,0000
1” = 500’-0”
500
Spring Creek Trail
extension to Mountain to
Meadow Trailhead and
future community path
Future community
path (per BSCO Trail
Plan)
Old Mountain to Meadow Trail
converted to neighborhood
connector trail
Trail connection to
Ousel Falls, Y ellow Mule
Trails, and T own Center
Trail connection to
T own Center along
historic route (per
BSCO Trail Plan)
Fish Camp Trail uphill
riding trail
Stacked loop equestrian trails
from the Corral Trailhead
Southern Comfort Flow Trail
(beginner or intermediate
ability level)(potential long-
range mountain bike lift access)
Southern Comfort Flow Trail
uphill riding trail shared with
existing bike park uphill trail
Potential additional long-range
lift served mountain bike trails
in Southern Comfort Zone
Lewis & Clark Flow Trail
uphill riding trail
Connector flow trail to existing
Lewis & Clark Flow Trail
Inspiration Point Trail reroute
Trail rerouted
around Par 3
course
Fish Camp Trail becomes
private west of this point
Neighborhood connector trails
Neighborhood
connector trail
Settlement
loop path
Spring Creek Trail
rerouted to west side
of private lot
Trail connection
requires trail
easements on lots
Flatiron
neighborhood
trail loop
Path connection from
Montage to future
park/trails to the east
Park fitness and
bicycle skills trail loops
Mountain to Meadow
trailhead (per BSCO
Trail Plan)
SOUTHERN
COMFORT
ZONE
MONTAGE
HOTEL
THE
SETTLEMENT
SETTLEMENT
NEIGHBORHOOD
HIGHLANDS
WEST
NEIGHBORHOOD
HIGHLANDS
NEIGHBORHOOD
SKI TIP GLADE
NEIGHBORHOOD
ELKRIDGE
NEIGHBORHOOD
INSPIRATION
POINT
NEIGHBORHOOD
WILDRIDGE
NEIGHBORHOOD
WILDERNESS
RIDGE
NEIGHBORHOOD
THE RANCHES
NEIGHBORHOOD
OUSEL
FALLS
FISH
CAMP
SPRING CREEK
RESERVE
NEIGHBORHOOD
FUTURE
FLATIRON
NEIGHBORHOOD
SPANISH
PEAKS
CLUBHOUSE
SPANISH
PEAKS GOLF
COURSE
MUL TI-
PURPOSE
COURTS
FUTURE
ASPIRE
BUILDING
ANDESITE
MOUNTAIN
FLATIRON
MOUNTAIN
BIG SKY
RESORT
FUTURE
PARK
PRACTICE
TEE
THE
DEN
THE
NEST
PAR 3
COURSE
SPANISH
PEAKS ENTRY
HOUSE
INSPO.
POINT
WILDERNESS
RIDGE
This map shows Avid’s design for potential bike trails for Spanish Peaks, a mountain community in Big Sky, MT. 14 layout, track style and integration of unique features that separate the Santa Clarita track from many of the generic tracks being constructed currently . Drainage, landscape and irrigation considerations will be made during this
phase . While asphalt is specified at the time of this RFP, we would work with our engineering partners to understand
if concrete is a better alternative given local soils, weather and so forth . A final surfacing recommendation and
complete specifications will be generated following
concept approval by the City .
It should be noted that proper pump track design
demands a thorough understanding of field-proven
specifications including turn radii, berm heights and
angles, roller heights and spacing, and the complex
geometry of compound intersections and ride line options .
Our team has many years experience designing and
building asphalt pump tracks all over the country, and we bring this particular knowledge to the process .
Output:
Detailed plans illustrating track layouts, start mounds, track features, berms, grading, infield drainage, and
finished landscaping will be prepared and integrated
into the overall plan set . Required fencing and pedestrian connections will also be shown . Construction details for the pump tracks will be provided on separate detail sheets .
All drawings shall be created using AutoCAD and an
electronic copy of all drawings shall be submitted to the City in .dwg, .pdf, and .shp formats .
Task 3.7
DESIGN OF 100 SPACE PARKING LOT
FOR HASKELL
Subtask:
In coordination with the road and site design, we will lay out a primitive parking area at the appropriate dimensions to accommodate approximately 100 vehicles on the
Haskell Road side of the site . We assume the parking area will be at or close to existing grade, and will not require retaining walls or substantial cut into the existing grade .
The parking area will be graded to sheet-flow runoff to adjacent landscape areas . Four Accessible parking spaces will be located and appropriately detailed, including
required signage and striping .
Output:
The parking lot layout and details will be integrated into the overall site plans and delivered at the appropriate detail for each of the required progress submissions .
Task 3.8
DESIGN OF 40 SPACE PARKING LOT FOR
BLUE CLOUD
Subtask:
In coordination with the road and site design, we will lay out a primitive parking area at the appropriate dimensions to accommodate approximately 40 vehicles on the Blue
Cloud Road side of the site . We assume the parking area will be at or close to existing grade, and will not require retaining walls or substantial cut into the existing grade .
The parking area will be graded to sheet-flow runoff to adjacent landscape areas . Two Accessible parking spaces will be located and appropriately detailed, including
required signage and striping .
Output:
The parking lot layout and details will be integrated into the overall site plans and delivered at the appropriate detail for each of the required progress submissions .
Task 3.9
DESIGN OF TWO CONCRETE VAULT TOILETS
Subtask:
Specify vault toilets, site on the plans, and design the associated slabs and access .
In coordination with the overall site plan, we will specify a commercially-available, premanufactured vault toilet
system . We will locate one vault toilet system on each side of the ridge, proximate to the parking areas and site amenities . Additionally, we will design the necessary slab or supporting base, and walkways/connections to the vault toilets .
Output:
The vault toilet locations and specifications will be
integrated into the overall site plans and delivered at the appropriate detail for each of the required progress submissions .
All drawings shall be created using AutoCAD and an
electronic copy of all drawings shall be submitted to the City in .dwg, .pdf, and .shp formats .
Task 3.10
DESIGN OF PICNIC TABLES, BENCHES, AND
OTHER SITE FURNISHINGS
Subtask:
Design of 8 picnic tables, 10 benches throughout site,
four bear-saver trash cans, two pet stations, four bike repair stations, six bike racks . We will locate and specify the requested number and type of site furnishings,
coordinated with the overall site plan . The site furnishings will be located to maximize accessibility to pedestrians and minimize maintenance requirements . Bicycle parking (bike racks) will be located near major site egress routes .
Picnic tables and benches may be located near shade
structures or tree installations per tasks outlined below to facilitate comfortable pedestrian spaces .
Output:
A landscape and site furnishings plan and associated
detail sheets will be delivered as part of the drawing set for each of the required progress submissions . We assume all site furnishings will be commercially-available products (design of custom furnishings is not included), and will be installed per manufacturer’s recommendations .
All drawings shall be created using AutoCAD and an
electronic copy of all drawings shall be submitted to the City in .dwg, .pdf, and .shp formats .
Task 3.11
DESIGN OF TREE PLACEMENT AND
INSTALLATION PLAN
Subtask:
In close coordination with the site plan and site
furnishings design, we will locate 12 shade trees
throughout the project area . The trees will be sited to provide shade to adjacent pedestrian spaces, frame
12 EASTLAND L L C
APN125-06-810-002
D
293
294
2735
2734
2733
2732
2731
2730
10'-7"
2'-6"
12'-6"
4'-0"
4'-0"
8'-9"
9'-6"
R11'-6"
R11'-6"
R12'-6"
R12'-6" R15'-0"
R15'-0"
R20'-0"
R6'-0"
R15'-0"
R3'-0"
R70'-0"
18'-4"
R10'-0"
R15'-0"
R12'-3"
R10'-0"
R12'-6"
9'-6"
7'-4"R12'-6"
walkways, pergola,
and bike racks by abla
12 12
12 12
12 12
24 36
1224
36 12
1212
12 12
24 24
12 1224
36 12
24 36
12 24
36 1224
36 12
12 12
12 12
36 24
24 12'-0" 12'-0" 12'-0" 12'-0"
12'-0"
11'-9"
12'-0"
9'-3"
12'-0"
17'-3"
17'-6"
6'-0"
17'-6"
9'-7"
12'-0"12'-0"
1212
10'-0"
32.00 4'-0"
12'-0" 4'-0"
12'-0"
35.50 35.00
BASE TRACK ELEVATION
31.50 BASE TRACK ELEVATION
31.50 +18
+24
+36
+24
+48
+24
+24
+24
+48
+24
+36
+48
+12
+18
+18
+24
+24
+24
+24
+18
+36
+24 +24+30
+48
+48
+12 +12
+12 +12
+36+36
+24
8'-6"
+24
32.00 32.00
RIDING SURFACE
32.00 +48
RIDING SURFACE
32.00 8'-8"
12'-0"
12'-0"
12'-3"
13'-6" 13'-6" 8'-7"
12 12 12
12'-4"
12'-0"
13'-0"
12'-0"
12 12
proposed grade spot
area drain location
asphalt paving
proposed 1' contour
track centerline
legend
area takeoffs
asphalt paving, ± 4673 SF
+18
N
DRAWING NUMBER
T-4.1
DRAWING TITLE
GRADING +
LAYOUT PLAN
OWNER/APPLICANT
ISSUE
PREPARED BY
DRAWN BY
TDG, MES
SCALE
1" = 10'-0"
REVISIONS
1 2
3 PROJECT
DATE
7.28.2022
FOR INTERNAL
REVIEW; NOT
FOR
CONSTRUCTION
LENNAR, LLC
9275 W RUSSEL ROAD
SUITE 400
LAS VEGAS, NV 89148
702-821-4808
SUNSTONE
SOUTH PARK
PUMP TRACK
SPOT ELEVATIONS REPRESENT HEIGHT OF
TRACK FEATURE ABOVE RIDING SURFACE.
Avid Trails pump track construction drawing sets include precise measurements and details of our custom track designs. important views, and/or mark pedestrian routes . Tree
species will be selected for the geophysical region in
which the project exists, and for drought tolerance as
the site will not be irrigated with an automatic sprinkler system . We assume trees will be irrigated via portable water bags for the initial acclimation period .
Output:
Proposed trees will be shown on a landscape and site
furnishings plan . Additionally, we will provide a plant schedule, including common and botanical names,
quantity, size, root/container specifications, and important notes . We will also provide a planting detail, including portable watering bags .
All drawings shall be created using AutoCAD and an
electronic copy of all drawings shall be submitted to the City in .dwg, .pdf, and .shp formats .
Task 3.12
DESIGN OF ROAD IMPROVEMENTS
Subtask:
A . Rough Grading Plan
Prepare 1”=40’ rough grading plan for the proposed
development based on the approved Final Site Plan . The rough grading plan will provide pads, road, and driveway grading . The rough grading plan will adhere to a client- provided soils report . No retaining walls are anticipated at this time . The following assumptions were made in
developing the scope for this task:
• Geological report/information required for this task will be provided by the city .
• This task does not include bike trail
• This task only includes parking areas and access road where improvements are required .
B . Precise Grading and Paving Plan
Based upon a client-approved site plan, we propose to
prepare and process with City of Santa Clarita Precise
Grading Plans at a scale of 1”=40’ or 1”=20’ . This plan will show finish levels, V ditches, driveway grades,
drainage swales, required parking area and access roads if needed . All drainage around improved areas will be accommodated with swales . Walkways, non-retaining walls and fences will be shown on the plan as indicated on plan prepared by the landscape architect . Driveway elevations and curb, gutters and driveway sections will be detailed .
Soils engineer to provide driveway sections . The following assumptions were made in developing the scope for this
task:
• Geological report/information required for this task will be provided by the city .
• Bike trail is excluded from this task
C . Drainage
Prepare hydrology and hydraulic analysis, and drainage
improvement design, as needed for improvements
excluding bike trail (Parking area and access roads only) The following assumptions were made in developing the
scope for this task:
• The work will be limited to specific areas of concern and does not include an analysis of the overall property .
• The City will provide all flood limits of concern .
D . Erosion Control/SWPPP Plans
Prepare and process both a Wet Weather Erosion Control
Plan and SWPPP per NPDES requirements . Erosion
control plans will be prepared for one rainy season .
Additionally, we shall also prepare a Local SWPPP to be reviewed and approved by the City of Santa Clarita .
E . Earthwork Calculations
Two earthwork quantity calculations will be prepared prior to approval of the grading plan for purposes of calculating plan check fees and providing a site balance .
Output:
A . Rough Grading Plan Set (1 Title, 1 Detail, 2 plan sheets) B . Precise Grading Plan Set (1 title, 1 detail, 4 plan sheets) C . Hydrology/hydraulic analysis report
Drainage improvements will be added to the precise
grading plans .
D . Erosion control plan (1 Title/Detail Sheet and 2 Plan Sheet), SWPPP Binder and Map, LSWPPP for City
submittal, NOI assistance
F Earthwork quantities .
All drawings shall be created using AutoCAD and an
electronic copy of all drawings shall be submitted to the City in .dwg, .pdf, and .shp formats .
Task 3.13
DESIGN OF SHADE STRUCTURES, SIGNAGE,
FENCING, GATES AND OTHER SITE
IMPROVEMENTS
Subtask:
Locate and specify shade structures, signage, fencing,
gates, storage structures, and water tanks, and design the associated slabs and access .
As part of the site plan, and in coordination with the
landscape and site furnishings plan, we will locate
appropriate shade structures for the project area . Due to the proposed budget for this project, we assume one
shade structure will be provided for each side of the ridge .
The shade structures will be commercially-available and installed per the manufacturer’s recommendations, and
will be selected to coordinate with the rugged aesthetic of the site . Sizing of the shade structures will be determined during the design process .
In addition to the shade structures, we will locate
appropriate fencing and pedestrian gates to control
access as necessary . Location and length of fencing will be determined during the design process, and will be
coordinated with pedestrian and vehicular circulation
routes . We assume fencing and pedestrian gates will be locally available wood fence . Note, no design of vehicular gates or automated access control is included as part of this scope .
The amount and style of storage structures needed for
the site will be determined during the design process .
For the purposes of this proposal, we assume all storage structures will be commercially-available and will be
installed per manufacturer’s recommendations . If, during the design process, it is determined that an alternative storage method is preferred (aka cargo containers), a
15 Family Bike Park | Wildflower Saratoga Springs, UT | February 18, 2018
STEP DOWN
SKILLS LOOP
PROGRESSIVE
JUMP LINE
SHADE PA VILION
BIKE RACKS
WORK STAND
“SLICKROCK”
UP & DOWN
OPTIONAL
DROP ZONE
100’50’0’
NICA COURSE
START/ FINISH
STAGING AREABEGINNER
ASPHAL T
PUMP TRACK
CAMP WILLIAMS
ADV ANCED
ASPHAL T
PUMP TRACK
Early stages concept plan for a family bike park in Saratoga Springs, UT.
Wildflower Family Bike Park | Concept Diagram
structural engineer may need to be engaged for the design of foundations, footings, tie downs, and/or structural
assessment of the cargo container .
Output:
Shade structures, pedestrian fencing and gates, storage structures, and water tanks will be located on the
landscape and site furnishings plan and will be delivered as part of the drawing set for each of the required progress submissions . . Cut sheets or manufacturer details will be provided . We assume all site furnishings will be
commercially-available products (design of custom
furnishings is not included), and will be installed per manufacturer’s recommendations .
All drawings shall be created using AutoCAD and an
electronic copy of all drawings shall be submitted to the City in .dwg, .pdf, and .shp formats .
Task 3.14
ENGINEER’S ESTIMATE FOR A USA BMX
COMPETITION RACE TRACK
Subtask:
Avid Trails and Hunsaker will collaborate to develop
an engineers estimate for a USA BMX sanctioned
competition race track on the site . This will be
accomplished following a thorough review of USA BMX
facility requirements and additional discussions with the City and key stakeholders on their local requirements .
Based on the requirements identified during our review
our team will develop an appropriate cost estimate that includes track construction, ancillary facilities, sewer, storm water and other necessary components .
Output:
The output for this task will be a PDF and .XLS engineers estimate with high level line itemed costs for the facility .
Task 3.15
COLLABORATION WITH TREK
PRO RIDER RY AN HOWARD
Subtask:
Our team collaborates with advocates and riders
throughout the country as part of our design-build work .
Whether this is through voluntary community input
sessions, expert panels, digital surveys or hiring pro-riders as consultants we are always eager to add expertise and unique perspectives to the planning process . We are
in active communications with Ryan Howard and look
forward to working with him and the Trek Bikes team on
this project . If a third party consultant is required and Mr .
Howard isn’t available we will leverage our nationwide
relationships with bike industry professionals and riders to add expertise where needed . It is important to note however that our construction team includes a two former pro-class downhill mountain bike racers, a NICA facilities and operations expert, mountain bike race promoter and
time keeper and other talented riders of varying skill
levels .
Output:
The anticipated output for this task is a consulting
agreement between Avid Trails and Ryan Howard, along
with ongoing collaboration and plan review with all
experts on the team .
Task 3.16
SUBMIT CONCEPTUAL DESIGN AT 30%
Subtask:
Upon receiving feedback in the Function Diagram phase,
and with a general acceptance by the City on the direction of the Bike Park design, we will advance the plans to
approximately 30% completion . During this phase, we will begin to lay out roads, parking areas, trails, pump tracks, site furnishings, and landscaping improvements . Grading will be incorporated at a conceptual level, and utility extensions, if any, will be roughly shown . Preliminary selections for shade structures, site furnishings, fencing, and site materials will be provided for review .
Output:
A conceptual design drawing set, delivered at
approximately 30% completion . The actual sheets included may be determined based upon the design elements,
but our anticipated deliverables include: Cover sheet,
General Notes and Conditions, Site Plan(s) Grading and
Utility Plan(s), Trail Layout Plan(s), Landscape and Site Furnishing Plan(s), and plan enlargements as necessary
to show additional detail . Preliminary selections for
manufactured site furnishings will also be provided . Plans will be developed on 24”x36” drawing sheets and delivered in electronic ( .pdf) format .
Task 3.17
SUBMITTAL OF PLAN SET SHALL BE DELIVERED
AT 60%, 90%, 100% COMPLETE AND FINAL.
Subtask:
The plan set will be advanced to approximately 60% and
90% completion, integrating feedback from the City at
each submission . The 60% and 90% submissions include
one submission only, all feedback provided by the City will be incorporated into the next milestone plan set .
At the 100% submission, we have included one round of
revisions to the drawing set to incorporate final comments from the City . Additional revisions at the request of the City will be billed in addition to the proposed fee schedule .
Output:
In addition to the plans outlined the in 30% task above, we will integrate construction details for site elements into the 60%, 90% and 100% design sets . Plans will continue to be delivered in electronic ( .pdf) format .
Task 3.18
PROVIDE AUTOCAD FILES FOR ALL PLAN SHEETS
Output:
Upon final written approval of the project, our team will provide project drawings in AutoCAD ( .dwg) format, in
addition to PDF and SHP files as applicable .
Task 3.19
DEVELOP AND MAINTAIN COMMENTS/
RESPONSES MATRIX THROUGHOUT THE DESIGN
Subtask:
As City comments are made on design and meeting
conversations, detailed notes will be recorded on an online matrix that will be accessible to entire team .
Output:
Maintain and update comments / response matrix
through life of project .
Task 4.1
PREPARE CONSTRUCTION SPECIFICATIONS
Subtask:
Included are, preparations of the “Special Provisions” in the latest edition of the Greenbook format for the civil improvements . The civil improvements specifications
will be prepared as amendments to the 2021 ‘Greenbook
Standard Specifications for Public Works Construction for Special Provisions’, in the City’s desired format .
Also see Task 4 .3 below
Output:
Specifications - Special Provisions
Also see Task 4 .3 below
Task 4.2
PROVIDE CITY WITH COMPLETE SET OF PLANS,
SPECIFICATIONS, AND ESTIMATE
Subtask:
See the detailed tasks in this proposal for specific plan, specification, and construction estimate details .
As outlined in the detailed task above, we will provide the City with an original complete set of plans, specifications, and construction estimate . The plans will be prepared
by Professional Engineers and Professional Landscape
Architects registered in California, and in good standing with their respective Boards .
Output:
Delivery of plans and specifications as outlined in this proposal .
Task 4.3
PROVIDE SUBMITTALS AT 90% AND 100%
Subtask:
Written CSI format construction specifications will be
developed alongside the project plans . Specifications will be prepared for trail and site materials, site furnishings, utilities, and landscaping . The 90% submissions include one submission only, all feedback provided by the City will be incorporated into the next milestone .
16 TASK 4: SUBMITTALS
Included are, preparations of the “Special Provisions” in the latest edition of the Greenbook format for the civil improvements . The civil improvements specifications
will be prepared as amendments to the 2021 ‘Greenbook
Standard Specifications for Public Works Construction for Special Provisions’, in the City’s desired format .
At the 100% submission, we have included one round
of revisions to the specifications to incorporate final comments from the City . Additional revisions at the request of the City will be billed in addition to the proposed fee schedule .
Output:
Written CSI, 3-part specifications .
Task 4.4
PREPARE ITEMIZED CONSTRUCTION BID
SCHEDULE AND COST ESTIMATES
Subtask:
This task includes preparing bid schedule of bidding
quantities for all proposed civil improvements related to the project . The bid schedule is anticipated to be initially prepared prior to 90% plan set approval, and revised as necessary to match the approved plans . Additionally, we will prepare an itemized Opinion of Probably Cost (OPC) based on our experience and current cost information for recent similar projects in the local area .
Output:
Itemized bid schedule and cost estimate .
Task 4.5
SUBMITTAL OF ENGINEERS ESTIMATE DELIVERED
AT 60%, 90% AND 100%
Subtask:
Submittal of the engineer’s construction cost estimate shall be delivered to the City at 60%, 90%, 100% complete and final in a spreadsheet format .
Output:
The construction estimate will be delivered to the City at the requested milestones .
Task 4.6
PROJECT DESIGN TO FOLLOW CITY DESIGN
STANDARDS
Subtask:
The project design shall be per the current City design standards and Standard Specifications for Public Works
Construction (Greenbook), Latest Edition, Standard Plans for Public Works Construction, Latest Edition, Standard Plans, Los Angeles County Department of Public Works,
latest edition, current California MUTCD standards and
Caltrans Standard Specifications, latest edition .
Output:
The project will be designed to the applicable local
governing authority requirements .
GENERAL ASSUMPTIONS AND EXCLUSIONS
The following items are exclusions to the contract; however, they could be included on a time and material basis or per an addendum to this contract if requested by the client . a . All documents will be submitted to the City for review . b . All governmental agency permits not specifically
included in the Summary of Services, including Corps
of Engineers, Regional Water Quality Control Board,
California Department of Fish & Wildlife, and Los Angeles County Flood Control .
c . Major revisions due to changes in project design, by client, updated consultants’ reports, new issue areas
or client requests . These items may be covered under
separate amendments to this contract .
d . Changes in codes or agency requirements . This proposal is based upon the regulations, conditions, and policies in place at the time it was written . Changes may require amendments to this contract .
e . Other services or additional work outside the scope of services may also be required . Client will be notified of these items if they occur and a contract addendum will be provided for your review and approval .
f . Other outside consultant reports not included in the proposal will be contracted directly with the client, if required and are not included in consultant’s fees .
g . Permit fees, processing fees and other such fees are not included and are to be paid by the client .
17 On the cover: Riding the clamshell of an Avid pumptrack, Pasco County, FL This page: Avid Trail’s Blue Steel flow trail and jump line, High Bridge, NJ All Avid pump tracks are designed for specific rider abilities. We often build beginner tracks next to intermediate / advanced tracks so riders can progress from one track to the next as their skills improve. This track was built in Glen Burnie, MD.
4. Project Schedule
18 BBlluuee CClloouudd BBiikkee PPaarrkk SScchheedduullee Exported on February 13, 2023 5:56:05 AM PST
The following schedule has an arbitrary start date of March 1, 2023 .
If the actual project is started earlier or later, the schedule should shift accordingly to the actual start date .
In this schedule, we have allowed generally 1 - 2 weeks for City review, comments and approvals at key stages . If more time is necessary, the schedule would shift accordingly .
5. Project Management
19 AVID TRAILS: PRIME CONSULTANT TEAM
ADDITIONAL SUB CONSULTANTS
HUNSAKER & ASSOCIATES: SUB CONSULTANT TEAM
Jay Hoeschler Design Director Project Lead , Trails and Bike Park Designer Justin Lax President Trails and Bike Park Designer
Tim Garrett, PLA Landscape Architect Trails and Bike Park Designer Lindsay Kageyama, PLA Landscape Architect Trails and Bike Park Designer Brad Thurgood Operations Manager Trails and Bike Park Designer Ryan Howard Pro Bike Rider, Trek Factory Team
RJ Lung & Associates Aerial Topography Survey
Jason H. Fukumitsu, PE, QSD President , Principal - Engineering Jeannine Mowrey, AICP, LEED AP Principal, Project Management Alireza Sazegari, EIT, LSIT Project Manager, Civil Engineer Bruce Tait, PLS Survey Manager
Adam Wakefield, IT-GIS Senior Designer
Jonathan Petke, PE Design Engineer
Matthew Mohler, PE Design Engineer
Sean Swanson, EIT Design Engineer
Project Management: For project management, our team establishes and follows a critical path schedule as shown on the previous page . In the initial engagement process, we identify key milestones with the design team and the City, then use those task durations and important dates to create the project workflow schedule . This is typically done in either SmartSheet or Microsoft Project . We are proficient with either system .
Meetings: Monthly or bi-weekly meetings will be scheduled with the City team for project updates and creative presentations . Agendas will be distributed in advance of meetings, and minutes from meetings will be distributed after each meeting . These meetings will typically held via Zoom, and our preference would be to make significant creative presentations in person at City offices Internally, the prime and sub-consultant teams will meet daily, weekly and bi-weekly as needed to make sure all tasks are on schedule .
File Sharing: A secure team file sharing system will be established, and all agendas, minutes, and deliverables will be made available to City and consultant teams .
The following chart outlines our team structure and key team members:
El Segundo, CA Office
Valencia, CA Office
6. T eam Personnel
The following bios and resumes reflect the Avid Trails and Hunsaker team that has been assembled for the Blue Cloud Bike Park design .
Jay Hoeschler
Design Director, Project Manager
Avid Trails
Jay Hoeschler is a founding
partner of Avid Trails . He heads
up a talented team of landscape
architects, designers, and GIS spatial
analysts who thoughtfully consider every aspect of the trail experience .
Jay will be leading the Blue Cloud design team, and
has countless hours of experience riding mountain bike
trails around Santa Clarita, Lake Hughes, and throughout Southern California . He has a particular affinity for
designing and building bike-optimized trails and features, including flow trails, downhill, XC, skills courses, jump lines and pump tracks .
In an attempt to practice what he preaches, Jay is a
dedicated mountain biker, road cyclist, swimmer, surfer, hiker, and competitive triathlete . He does all this so he can enjoy craft beer with (mostly) zero guilt .
Jay serves as Planning Commissioner for his home
town of El Segundo, CA . He is a full member of the
Urban Land Institute, and serves on its Residential
Neighborhood Development Council . He is a member of
the Professional TrailBuilders Association (PTBA), as well as the International Mountain Bike Association (IMBA) .
He also serves on the board for Tour de Pier, an annual charity spin bike event that raises millions each year to fight cancer .
Justin Lax
Bike Park Designer, Principal
Avid Trails
Justin Lax is a founding partner
and the President of Avid Trails .
Justin founded Avid Trails with a
group of partners who share his
vision for bringing better trail systems, bike facilities and outdoor recreation opportunities to communities across the country . His approach centers around creating thoughtful, connected and interesting trail systems and bike facilities that help get people spending time outdoors, growing
their passion for hiking and biking and progressing their abilities .
Justin’s robust experience in trail construction results in a deep understanding of trail constructibility and feasibility .
This helps to inform all planning and design work
completed by the firm . As a lifelong two wheel enthusiast and avid rider, he understands how to design and build
things that work for the target audience .
Justin volunteers actively at his local YMCA where he
focuses on initiatives that help kids and families reconnect with the outdoors . He is also a past Board Member of the Professional Trail Builders Association and a member
of the Urban Land Institute where he works to increase
access to trails and outdoor rec in communities throughout the country . Justin is based in Stockton, NJ with his wife Amanda where they frequent local trails on two feet and two wheels . He likes riding rock gardens and log skinnies just as much as he enjoys hitting jumps and always enjoys a good craft beer when the ride is over .
Tim Garrett, PLA
Landscape Architect, Trails Planner
Avid Trails
Tim’s love of the outdoors began on
the trails and ski slopes of northern
New Jersey, and he’s been riding
or fixing bikes and trails ever since .
Tim’s professional work includes the design of trails, parks, playgrounds, outdoor fitness, urban development, higher education campuses, and green infrastructure . Tim brings his training and experience as a Registered Landscape
Architect to Avid Trails projects with a focus on creating engaging, memorable places that facilitate interaction with the environments we live and recreate . Tim is a member of the American Society of Landscape Architects .
Lindsay Kageyama, PLA
Landscape Architect, Trails Planner
Avid Trails
Lindsay Kageyama is a professional
landscape architect and comes to
Avid Trails with extensive experience
in recreation planning and design .
Her professional experience ranges from regional-scale
analysis and planning for public agencies to thoughtful site design including trails, recreation amenities, streetscapes, and residences . Lindsay’s professional work has been
recognized by the national American Society of Landscape Architects, the Urban Land Institute, and regional and state chapters of the American Planning Association .
Lindsay graduated summa cum laude with a Bachelor of
Landscape Architecture from Cal Poly San Luis Obispo
and lives in Lake Tahoe, California . When not at work, she enjoys exploring the Sierra Nevada mountains whether on a mountain bike, on a hike, or on a pair of skis . Lindsay is a member of the American Society of Landscape Architects .
Brad Thurgood
Director of Operations, NICA Utah
Avid Trails
Brad Thurgood is an ongoing
resource for the Avid Trails design
team . His role as the director of
logistics and operations for the Utah
High School Cycling League offers unparalleled insight
into the planning requirements for NICA and other cycling events . Brad is responsible for organizing and directing the complexities of race venues, including course layout, start and finish zones, pit and staging areas, parking
requirements, and safety management on race day . With
this experience, Brad is our go-to guy for collaborating on all bike race and cycling event area planning and design .
Ryan Howard
Trek Pro Rider, Consultant
Ryan brings pro-level riding
experience to our team . We look
forward to his collaboration and
contribution to the assignment .
20 Every member of the Avid Trails design team loves riding bikes. (left) President Justin Lax test pilots a new Avid designed and built trail in Corner Canyon UT; (right) Landscape architect Tim Garrett sending it in 2004. Tim has since moved up to 29” wheels.
21 HUNSAKER & ASSOCIATES
LOS ANGELES
PROFESSIONAL RESUME
Jason H. Fukumitsu, P.E. QSD
President/Principal - Engineering
Mr. Fukumitsu has 31 years of experience in the design and management large-scale private residential and commercial land development projects.
He has experience working on entitlement projects and providing technical support for EIR documents. His experience includes drainage, sanitary sewer design, highway, grading, utility, and street design in both hillside and flatland sites. He also functions in a review capacity for many important projects including flood control projects, major drainage projects and construction of flood control structures.
Key Projects:
Lincoln Boulevard-Playa Vista
Los Angeles, CA :
As Project Manager, provided concept design, and QA/QC review of the PSR and PR for the Lincoln Boulevard realignment project and intersection reconstruction at Jefferson Boulevard.
Imperial Highway Pavement Rehabilitation, Lynwood, CA :
Managed and prepared improvement plans, schedule and project estimates for pavement rehabilitation work to include sidewalk and parkway design, curb and driveway approaches, gutters and cross gutter relocations, hydrology and drainage calculations, striping, signage and traffic control.
Widening Copperhill Drive between Dickason Dr. and McBean Pkwy., Santa Clarita, CA:
Project Manager of civil engineering services for this Major Highway road widening project to include road improvement plans, striping plans, drainage and signalization. The project also included detour plans and traffic control plans.
Widening Newhall Ranch Road from Copperhill Dr. to Dickason Dr., Santa Clarita, CA:
Civil engineering Project Manager for this Major Highway road widening project including road improvement plans, striping plans, drainage, detour and traffic control plans and signalization.
Extension of Newhall Ranch Road from Bouquet Canyon Road to Golden Valley Road ., Santa Clarita, CA:
Managed Civil Engineering conceptuals for Newhall Land. Scope included initial conceptuals for the extension of the major roadway using PSRE/STIP Jason Fukumitsu, P.E.,
LEED AP
[email protected]
Credentials:
BS/1983/Civil
Engineering/Stanford
University
1986/Professional
Engineer/California/#40695
American Society of Civil
Engineers
American Planning
Association
HUNSAKER & ASSOCIATES
LOS ANGELES
26074 Avenue Hall
Suite 23
Valencia, CA 91355
(661) 294-2211
(661) 294-9890 Fax
Additional offices located
in Irvine, San Diego and
Riverside.
www.HunsakerLA.com
Funding. Subsequently, became the civil engineering Project Manager for this Major Highway roadway extension including road improvement plans, striping plans, drainage and signalization. The project also included traffic control design.
River Park, Decoro Highlands, East Creek/Creek Side, Decoro South and West Creek, Santa Clarita, CA: Project Manager of civil engineering services for five master-planned, community projects under development in unincorporated Los Angeles County and the City of Santa Clarita. The project includes river hydraulics; water quality analysis, hydrology; preliminary engineering and grading studies; tentative mapping; EIR technical support and supporting documents; final engineering to include grading and infrastructure; cost estimating which includes value engineering, project phasing and an earthwork management plan; drainage and sewer master planning; highway alignment studies; E.I.R. and entitlement support.
Miscellaneous Drainage EIR Projects: Project Manager for Master’s College Access EIR, North Newhall EIR, Via Princessa EIR, and Portuguese Bend EIR Prepared the technical appendices and impacts analysis the drainage section of the EIR. Provided technical support and supporting documents to the EIR team
Avenue Tibbets Relief Sewer Trunk Main, Santa Clarita, CA: Senior Manager responsible for the improvement plans for approximately 12,500 lineal feet of LA County Sanitation District sewer main. The system included a new 48” to 54” diameter RCP main located within existing streets, undeveloped land, and Caltrans R/W. The trunk main provided increased capacity a several large developments and included by-pass manholes, connection to and rerouting of existing mains, and a tie into the existing District 32 influent sump.
River Village – Onsite Sewer and Golden Valley Bridge Sewer System, Santa Clarita, CA
Senior Project Manager for civil engineering services for the project. Sewer improvements included a 1,200-acre service area which includes several points of connections and development tracts. The work included a sewer area study, new sewer mains, connection into existing sewer systems, and 1,500 lineal feet of a primary and secondary sewer main hung from the bridge structure. The system included a steel casing and HDPE main pulled through the casing, and hung over the Santa Clara River.
Mission Village, Newhall Ranch- Tract 61105
Newhall Land
Valencia, Northern LA County, California
This project is an approximately 1,260 acre master-planned community including 4,550 units, a 1.55-million square-feet of commercial uses; a fire station; a library, an elementary school, a transit center flood control facilities; two public 21 22
HUNSAKER & ASSOCIATES
LOS ANGELES
PROFESSIONAL RESUME
Jeannine Mowrey, AICP, LEED AP
Principal
Ms. Mowrey has been in the land development business for over twenty-five (25) years and is currently one of the managing partners of the Hunsaker & Associates Los Angeles office. Ms. Mowrey’s primary responsibilities include managing complex land development projects in challenging jurisdictions. She strategically maneuvers complicated projects through the entitlement approval and permitting processes, governmental relations, manages sub-consultants and co-consultants, prepares and process es tentative maps, general plan amendments, zone changes, Specific Plans, and other entitlement approvals.
Ms. Mowrey’s responsibilities also include project management, preparation and processing of tract and parcel maps, lot line adjustments, Certificates of Compliance, utility coordination including easements dedications and quitclaims, and bond exonerations. She has played a lead role in the formation of many traffic, drainage and lighting assessment districts throughout Los Angeles County. Jeannine especially enjoys preparing Due Diligence investigations and feasibility studies for a variety of residential and non-residential clients.
Jeannine is certified by the American Institute of Certified Planners (AICP) and is also a LEED Accredited Professional (LEED AP BD+C).
Key Projects:
Mission Village, Newhall Ranch- Tract 61105
Newhall Land
Valencia, Northern LA County, California
This project is an approximately 1,260 acre master-planned community including 4,550 units, a 1. 55-million square -feet of commercial uses ; a fire station; a library, an elementary school, a transit center flood control facilities; two public parks and multiple private parks, flood and water quality facilities, water tank sites, sewer lift station, regional infrastructure, two major highways including a bridge. The project includes 29.7 million cubic yards of earthwork. Jeannine continues to be responsible for project entitlements, conditions clearances, permitting, community facilities district support, recordation of seven phased final maps, negotiation and execution of a variety of easements for public and private improvements, and program management.
Jeannine Mowrey,
AICP, LEED AP
[email protected]
Credentials:
BA University of California,
Irvine, 1994, Environmental
Analysis and Design with
an emphasis in Urban and
Regional Planning
HUNSAKER & ASSOCIATES
LOS ANGELES
26074 Avenue Hall
Suite 23
Valencia, CA 91355
(661) 202-5409
Additional offices located
in Irvine, San Diego and
Riverside.
22
parks and multiple private parks, flood and water quality facilities, water tank sites, sewer lift station, regional infrastructure, two major highways including a bridge. The project includes 29.7 million cubic yards of earthwork. Mr.
Fukumitsu continues to be responsible for program management, master-plan final engineering for multiple phases of improvement plans for regional infrastructure such as: flood control and water quality facilities, major arterial highways, trunk sewers and lift stations, earthwork management, value engineering, hydrology and water quality reports, and cost estimating.
Decoro Highlands, East Creek, Creekside, Riverpark, Alta Vista and West Creek
Valencia, CA
Project Manager of civil engineering services for six master -planned, community projects under development by The Valencia Company in the City of Santa Clarita and unincorporated Los Ang eles County. The projects included preliminary engineering and grading studies; tentative mapping; river hydraulics; water quality; final engineering to include grading and infrastructure; cost estimating which includes value engineering, project phasing and an earthwork management plan; drainage and sewer master planning; highway alignment studies; E.I.R. and entitlement support.
HUNSAKER & ASSOCIATES
LOS ANGELES
PROFESSIONAL RESUME
Alireza Sazegari, EIT, LSIT
Project Manager
Mr. Sazegari has been in the engineering and land development business for over fourteen (14) years and is currently a Project Manager at the Hunsaker & Associates Los Angeles office. Mr. Sazegari has managed several complex land development projects and has over ten (10) years of civil, architectural and electrical design experience. He specializes in grading design but also has extensive experience in storm water, water quality, sewer and water design.
Mr. Sazegari started his career as a Geologist and then became a Civil Engineer specializing in government and commercial landfill and land development projects. He then managed numerous large-scale public projects as a project Manager and Project Engineer. Alireza’s experience and diverse background has made him an exceptional Project Manager. He has the capacity to see the big picture from every angle of development.
Mr. Sazegari’s strengths include his technical abilities and superior collaboration skills. He is very detailed and has an immense stamina for handling large scale projects. He takes initiative and pride in the good work he does.
Alireza is EIT and LSIT certified by the California Board of Professional Engineers and Land Surveyors. He is also OSHA Safety and HAZWOPER certified.
Key Projects:
Santa Clarita Valley Sheriff Station
(Los Angeles County Sheriff’s Department)
Santa Clarita, California
Project Manager
As a consultant to the City of Santa Clarita, Alireza has be en the engineering project manager for the new LA County Sheriff Station Headquarters in the City of Santa Clarita. The station is approximately 33,000 square feet with a 6,000 square foot maintenance building, detention facility, and heliport. The project required significant offsite infrastructure including: street widening, water line extension, utility relocations, and dry utility extensions. He got involved with the project at the conceptual design stage, managed all civil design, provided bid and construction support for all civil improvements, and is currently managing civil construction support operations for onsite improvements as well as offsite infrastructure improvements.
Alireza Sazegari,
EIT, LSIT
[email protected]
26074 Avenue Hall STE 23
Valencia, CA 91355
Credentials:
BS University of California,
Irvine, 2009, Civil
Engineering, Structural
Jeannine Mowrey - Resume
Homestead, Newhall Ranch
Entitlements and Preliminary Engineering
Unincorporated LA County
On behalf of Newhall Land, Ms. Mowrey managed the vesting tentative tract map and accompanying exhibit maps and prepared an entitlement package for a roughly 2,900 acre, mixed -use property with approximately 5,700 home sites and 1,250,000 s.f. of commercial uses. Entitlements submitted include: vesting tentative tract map, conditional use permit and oak tree permit.
Legacy Village - Stevenson Ranch Phase V
Newhall Land
Unincorporated LA County
On behalf of Newhall Land, Ms. Mowre y managed the vesting tentative tract map and accompanying exhibit maps and prepared entitlement strategy for a roughly 1,800 acre, mixed -use property with approximately 3,500 home sites and 500,000 s.f. of commercial uses. Entitlements submitted include: vesting tentative tract map, local and countywide general plan amendment, zone change, conditional use permit, and oak tree permit.
Five Knolls (Keystone) Tract 60258
Brookfield Homes
City of Santa Clarita, California
This project is a 245 acre residen tial development including 119 lot single family homes, 380 detached condominium homes, a public park, recreation center, YMCA and senior center sites, public and private trails, a secondary arterial roadway, and all related infrastructure for this master -planned community. Jeannine was responsible for recordation of three final maps, negotiation and execution of a variety of easements for public and private improvements, management and coordination of condominium plans and other BRE -required documents, and management of Drainage Benefit Assessment District.
Valencia Commerce Center
Newhall Land
Unincorporated LA County
On behalf of Newhall Land, Ms. Mowrey managed the vesting tentative parcel map and accompanying exhibit maps and prepared the entitlement strategy for most of the remainder of the Valencia Commerce Center – a 615 acre, commercial and industrial property with approximately 3.6 million s.f. of commercial and industrial uses. Entitlements prepared and submitted include:
vesting tentative parcel map, conditional use permit, oak tree permit and CUP Conformance Report.
23 24
HUNSAKER & ASSOCIATES
LOS ANGELES
PROFESSIONAL RESUME
Bruce Tait, PLS
Surveyor
Mr. Tait has over 40 years of experience in design and survey work throughout Southern California. This work has included public works and land development projects. He has supervised projects in San Diego, Orange, Imperial, Los Angeles, Riverside, Ventura, Kern and Contra Costa Counties.
Key Projects:
Highway 101 Median, Ventura, CA: Mr. Tait’s team obtained topography for a portion of State Highway 101 median
using GPS and total stations. Due to traffic conditions and Caltrans requirements, work was done at night.
Adolfo Camarillo High School, Camarillo, CA: Mr. Tait’s team performed a boundary survey for fencing at high
school and along Caltrans 101 right of way.
Wilmington Waterfront Promenade, Port of Los Angeles, CA: Mr.
Tait supervised construction staking for grading,
roads, utilities, structures and piers for waterfront improvement project.
Los Angeles Union Station Rail Improvements, Los Angeles, CA:
Mr. Tait directed construction staking for rail
improvements and modifications at LA Union Station.
Goleta Layover, Goleta, CA: Mr. Tait directed construction staking for rail improvements and modifications at the
Goleta Amtrak layover in Goleta.
Pioneer Drive ALTA, Glendale, CA: Mr. Tait’s team performed an ALTA survey for proposed development site for a
multifamily affordable housing project.
AutoCamp ALTA, Three Rivers, CA: Mr. Tait’s team performed an ALTA survey for proposed RV campground
improvements.
Bruce Tait,
26074 Avenue Hall STE 23
Valencia, CA 91355
Credentials:
BS San Diego State
University Civil Engineering,
California 1980 Professional
Engineer No. 32247
(license authorized for land
surveying)
24
Mission Village, Newhall Ranch- Tract 61105
Mission Village
Valencia, Northern LA County, California
This project is an approximately 1,260 acre master -planned community including 4,550 units, a 1.55 -million square -feet of commercial uses; a fire station; a library, an elementary school, a transit center flood control facilities; two public parks and multiple private parks, flood and water quality facilities, water tank sites, sewer lift station, regional infrastructure, and two major highways including a bridge. The project includes 29.7 million cubic yards of earthwork. Mr. Sazegari continues to be responsible for project management.
He is in charge of construction support as well as coordinat ing and preparing design drawings for multiple phases of improvement plans for regional infrastructure such as: flood control and water quality facilities, major arterial highways, trunk sewers , lift stations, earthwork management, value engineering, hydrology, water quality reports, and cost estimating.
Highridge Costa Housing Partners
LA County, California
Alireza has worked on multiple projects for Highridge Costa as Project Manager and Project Engineer. These projects were located in different areas of Los Angeles County. The projects were all multi- residential developments with 50+ apartment units. His role was to Manage the pr oject and the design team to prepare civil design development plans including street improvements, Sewer and hydrology studies, storm water and LID plans, sewer and water plans as well as precise and rough grading design. Few examples of these projects are:
1- The Rise apartments, Los Angeles CA (57 Units)
2- Main Street Apartments, Los Angeles CA (57 Units)
3- Central Apartments, Los Angeles CA (57 Units)
4- R Ave Apartments, Palmdale CA (57 Units)
Rye Canyon Median Refurbishment
Santa Clarita, California
This project was a median refurbishment/redesign landscape project on Rye Canyon Road between Avenue Stanford, and Avenue Scott within the existing raised median. The project will consist of improving condition s of existing median, as well as adding two left turn pockets. Mr. Sazegari acted as the project Manager on this project. This project also included preparing bid schedule, design specifications, cost estimate for the construction phase, as well as construction support, and construction management. 25 HUNSAKER & ASSOCIATES
LOS ANGELES
PROFESSIONAL RESUME
Adam Wakefield, IT-GIS
Senior Designer
Mr. Wakefield has been in the land development business for twenty-one years and is currently a Senior Designer and
Manager in the Los Angeles office of Hunsaker and Associates, Inc. His primary responsibilities include directing site
planning and grading design on tentative and final engineering levels, as well as directing GIS work and managing the
network infrastructure of the office. He has worked with architects, civil and structural engineers to prepare tentative
maps, improvement plans, cut sheets, site plans, environmental exhibits. He also provides construction support.
Key Projects:
Lake Sherwood; Thousand Oaks, California
Sherwood Development Company
Drafted mass grading of 77 custom estate home sites. Assembled tentative maps. Assisted in generating an oak
tree protection report.
Valley Central Shopping Center; Lancaster California
RVIP Valley Central, L.P.
Assisted the Senior Project Manager and Architect with overall site design. Set up a basis for all conceptual and
construction drawings. Coordinated data communication between the entire design team.
Reagan Presidential Library; Simi Valley, California
Ronald Reagan Presidential Foundation
Assisted Senior Project Manager with site research and development of an exhibit hall expansion to feature Air
Force One.
Canyon Gate; Santa Clarita, California
D.R. Horton
Responsible for converting data from previous lead engineering firm.
Supported the field survey crew with
detailed COGO data for the mass grading of keyways, streets and lots.
Developed a system for quickly drafting
fine grading in CAD.
Adam Wakefield,
EIT, LSIT
[email protected]
26074 Avenue Hall STE 23
Valencia, CA 91355
Credentials:
BA Michigan State
University, Michigan, 2000,
Telecommunications
Jonathan Petke, P.E.
Design Engineer
Credentials:
BS University of California, Berkeley, 1996, Civil Engineering California, 2005, Registered Professional Engineer No. 67585 Professional Experience:
Mr. Petke has experience in project management, civil engineering design, infrastructure improvement engineering including street design, public agency plan processing, construction support, and dealing with endangered species habitat including mitigation design and implementation. He has also obtained encroac hment permits for storm drains and utilities within the Public Right-of-Way in various jurisdictions of Southern California, Key Projects:
City of Corona, Dos Lagos project, Corona, CA : Mr. Petke designed street, sewer, storm drain, water, golf course, and grading for mixed-use development.
Orange County, Ladera Ranch, Orange County, CA : Mr. Petke developed street, sewer, storm drain, water, and grading design for mixed use hillside development.
City of Long Beach, Promenade -Mid Block Project, Long Beach, C A: Mr. Petke prepared street, sewer, storm drain, water, and grading design for downtown infill mixed use development.
City of Long Beach Promenade – Pacifica, Long Beach, CA : Mr. Petke provided street, sewer, storm drain, water, and grading design for urban mixed-use development.
City of Riverside, Lowe’s Shopping Center, Riverside, CA : Mr. Petke created street, sewer, storm drain, water, and grading design for urban shopping center.
City of Costa Mesa, South Coast Home Furnishing Centre, Costa Mesa, CA : Mr. Petke designed street, sewer, storm drain, water, and grading design for urban infill development.
Multiple Cities, AutoZone Stores, Costa Mesa, Perris, Rialto and San Diego, CA : Mr. Petke developed street, sewer, storm drain, water, and grading design for multiple shopping mall locations.
City of Brea, Brea Plaza, Brea, CA: Mr. Petke created street, sewer, water, storm drain, water quality, and grading design for major shopping center.
City of Orange, Ridgeline Equestrian Estates, Orange, CA : Mr. Petke prepared preliminary engineering; tentative tract map, street, sewer, storm drain, water, grading and water quality design for equestrian residential project.
KEY FACTORS
26 years of experience with PE
registration
Knowledgeable of Federal, State
and local regulations
Created innovative solutions for
public facilities and roads
Expertise in environmental
mitigation strategies
Excellent communicator and
success in obtaining permits
25 26
Matthew Mohler, P.E.
Design Engineer
Credentials:
BS California State Polytechnic University, Pomona, 2011, Civil Engineering
California, 2015, Professional Engineer Civil No. 84160 Professional Experience:
Mr. Mohler has experience in developing effective designs for local streets and arterials along with the related storm drain facilities and grading to successfully handle storm runoff. He also has a strong background in all wet (sewer, water, recycled) and dry utility systems engineering including coordination with multiple utility owners.
Key Projects:
IRWD, Great Park Neighborhoods Utility Systems, Irvine, CA: Mr. Mohler participated in the team that created the design of 67 miles domestic water main, 28 miles of recycled water mains and 54 miles of sanitary sewer mains and appurtenances such as booster pump stations and lift stations in compliance with IRWD criteria and coordination of dry utility facilities.
Engineer at Lighthouse Design Consulting, Fullerton, CA : Mr. Mohler was responsible for coordinating dry utilities for commercial and residential developments including electrical, street lights, telephone, CATV and gas systems.
City of Tustin, Plan Checking, Tustin, CA: Mr. Mohler performed checking of plans for site layouts, grading, streets and utility systems for compliance with applicable City requirements.
City of Tustin , Sports Complex at Legacy Infrastructure, Irvine, CA : Mr. Mohler was involved in facility layouts, detailed grading design coordinated with drainage and water quality treatment BMP’s along with access roads, parking lots and utility services.
City of Irvine, Great Park Neighborhoods Infrastructure, Irvine, CA : Mr. Mohler assisted in design efforts from initial concept designs to preparation of construction documents for 10 miles of street improvements, design of several parks and trails involving extensive demolition of runways and 1 million cubic yards of earthwork.
City of Irvine, Sports Complex at Great Park Infrastructure, Irvine, CA: Mr. Mohler was involved in the design of 1.5 miles of arterial roadways, 10,000 LF of trail and sidewalk, 8,000 LF of storm drain pipe and 1 million CY of earthwork.
City of Irvine, Irvine Boulevard Rehabilitation/Widening, Irvine, CA : Mr. Mohler p repared widening and improvement plans for 3 ,000-foot segment in accordance with City standards including signing and striping and traffic control.
KEY FACTORS
15 years of experience and PE
registration
Capable designer of sewer, water
and recycled systems
Expert at dry utility design and
coordination with owners
Experienced engineer for local
streets and arterials
Excellent communication with
agency staff and stakeholders
Sean Swanson, EIT
Design Engineer
Credentials:
BS, Chico State University, Chico, CA, 2011, Civil Engineering California. 2011 Engineer-in-Training No. 104744
Professional Experience:
Mr. Swanson has a wide range of experience in the Civil Engineering Industry in Southern California. His design experience includes grading, sewer and water pipeline infrastructure, tentative tract map preparation, site plans and roadway improvements. His key roles included project coordination with clients, subconsultants and governmental agencies, as well as cost estimates, performing field construction observation and creating as -builts. In addition to new street design, he has experience in design of upgrades and pavement rehabilitation for existing streets.
Key Projects:
Grading, Street, Sewer and Water Design, Costa Mesa, CA: Mr. Swanson provided hillside rough grading plan, street improvements, sewer, domestic water and non- domestic water plans. Responsibilities included verifying conditions of approval and coordination with client, sub-consultants and governmental agencies.
Crown Valley Community Park Tier I, Aliso Viejo, CA : Mr. Swanson created grading, utility, retaining wall profile and storm drain design for amphitheater and adjacent play areas.
Heritage Fields Backbone Streets, Irvine, CA : Mr. Swanson a ssisted in design for 10 miles of He ritage Fields backbone streets including Trabuco Road, Ridge Valley and several unnamed streets.
Victoria Street Median Improvement Plan, Costa Mesa, CA : Mr. Swanson p repared median street improvement plans for Victoria Street including coordinating with Traffic Engineer for turn pockets in median.
Alicia Median Modification Plan, Aliso Viejo , CA: Mr. Swanson developed design that increased capacity of left turn pocket and coordinated with landscape, traffic, Caltrans and City to ensure project success.
Culver Drive at I -5 Freeway Pavement Rehabilitation, Irvine, CA: Mr. Swanson p rovided exhibit with limits of pavement rehabilitation for the City of Irvine and coordinated with subconsultant for striping plan.
KEY FACTORS
11 years of experience and EIT
registration
Experienced street designer for
large projects
Capable designer for paving rehab
and other upgrades
Prepared several median designs
for existing arterials
Knowledge of water, sewer and
reclaimed water systems
26 7. Indemnity and Insurance Notice
NOTICE TO PROPOSERS REGARDING INDEMNITY AND INSURANCE REQUIREMENTS PROFESSIONAL SERVICES AGREEMENT – DESIGN
PROPOSAL # PPOS-22-23-P0020B
Design of the Blue Cloud Bike Park
City Project No. P0020
City of Santa Clarita, California
SUMMARY OF CONTRACTUAL REQUIRMENTS
1. A contract is required for any service performed on behalf of the City of Santa Clarita (City).
2. By submitting a proposal, you have reviewed the sample contract documents contained within this request for proposals and agree to be bound by the requirements set forth.
3. Questions and requests for modification of these terms must be negotiated and approved prior to proposal submission and are at the full discretion of the City.
SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS
1. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by City’s Purchasing Agent.
2. You should check with your Insurance advisors to v erify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor’s liability under this agreement. The full coverage and limits afforded under Contractor’s policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required.
The Insurance obligations under this agreement shall be: 1—all the Insurance coverage and limits carried by or available to the Contractor; or 2 —the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City.
3. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. City reserves the right to require full- certified copies of all Insurance coverage and endorsements.
I. INDEMNIFICATION:
To the fullest extent permitted by law, including without limitation Civil Code sections 2782 and 2782.8, CONSULTANT shall defend (with legal counsel reasonably acceptable to CITY), indemnify and hold harmless CITY and its officers, agents, departments, officials, representatives and employees (collectively “Indemnitees”) from and against any and all claims, loss, cost, damage, injury (including, without limitation, economic harm, injury to or death of an employee of CON SULTANT or its subconsultants),
expense and liability of every kind, nature and description that arise from or relate to (including, without limitation, incidental and consequential damages, court costs, attorneys’ fees, litigation expenses and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation) that arise from or relate to, directly or indirectly, in whole or in part, from: (1) any negligent act or omission of CONSULTANT, any subconsultant, anyone directly or indirectly employed by them, or anyone that they control; (2) any actual or alleged infringement of the patent rights, copyright, trade secret, trade name, trademark, service mark or any other intellectual or proprietary right of any person or pe rsons in consequence of the use by CITY, or any other Indemnitee, of articles or Services to be supplied in the performance of this Agreement; or (3) any breach of this Agreement (collectively “Liabilities”). Such obligations to defend, hold harmless and indemnify any Indemnitee shall not apply to the extent such Liabilities are caused by the sole or active negligence or willful misconduct of such Indemnitee, but shall apply to all other Liabilities.
The foregoing indemnification provisions will not reduce or affect other rights or obligations which would otherwise exist in favor of the CITY and other Indemnitees.
CONSULTANT shall place in its subconsulting agreements and cause its subconsultants to agree to indemnities and insurance obligations in favor of CITY and other Indemnitees in the exact form and substance of those contained in this Agreement.
II. INSURANCE
(A) Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below:
Type of Insurance Limits
Commercial general liability: $1,000,000/$2,000,000 aggregate Professional liability $1,000,000
Business automobile liability $1,000,000
Workers compensation Statutory requirement
(i) Commercial general liability insurance will meet or exceed the requirements of ISO-CGL Form No. CG 00 01 11 85 or 88. The amount of insurance set forth above will be a combin ed single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage.
Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto). Liability policies will be endorsed to name CITY, its officials, and employees as “additional insureds” under said insurance coverage and to state that such insurance will be deemed “primary” such that any other insurance that may be carried by CITY will be excess thereto. Such endorsement must be reflected on ISO Form No. CG 20 10 11 85 or 88, or equivalent. Such insurance will be on an “occurrence,” not a “claims made,” basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY. (ii) Professional liability coverage will be on an “occurrence basis” if such coverage is available, or on a “claims made” basis if not available. When coverage is provided on a “claims made basis,” CONSULTANT will continue to renew the insurance for a period of at least three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy 27 that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect.
CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement, including endorsements, and such other evidence of insurance or copies of policies as may be reasonably required by CITY from time to time.
Insurance must be placed with California- admitted insurers with (other than worke rs compensation) a current A.M. Best Company Rating of at least “A:VII.”
Waiver of Subrogation: The insurer(s) agree to waive all rights of subrogation against CITY, its elected or appointed officers, officials, agents, volunteers and employees for losses paid under the terms of the workers compensation policy which arise from work performed by CONSULTANT for CITY.
Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSUL TANT’s expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to TERMINATION section. In the alternative, should CONSULTANT fail to meet any of the insurance requirements under this Agreement, City may terminate this Agreement immediately with no penalty.
Should CONSULTANT’S insurance required by this Agreement be cancelled at any point prior to expiration of the policy, CONSULTANT must notify City within 24 hours of receipt of notice of cancellation.
Furthermore, CONSULTANT must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer’s issuance of notice of cancellation. CONSULTANT must ensure that there is no lapse in coverage.
The CITY shall be entitled to any coverage in excess of the minimums required herein.
I have read and understand the above requirements and agree to be bound by them for any work performed for the City.
Authorized Signature: ______________________________ Date: ___________________
Printed Name: ____________________________________
DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS
PROPOSAL # PPOS-22-23-P0020B
Design of the Blue Cloud Bike Park
City Project No. P0020
City of Santa Clarita, California
Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or render service in excess of ½ of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid . If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed.
Subcontractor
DIR Registration No. Dollar Value of Work
Location and Place of Business
Bid Schedule Item No’s: Description of Work
License No.
Exp. Date: / / Phone ( )
Subcontractor
DIR Registration No. Dollar Value of Work
Location and Place of Business
Bid Schedule Item No’s:
Description of Work
License No.
Exp. Date: / / Phone ( )
Subcontractor
DIR Registration No. Dollar Value of Work
Location and Place of Business
Bid Schedule Item No’s: Description of Work
License No.
Exp. Date: / / Phone ( )
NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless cu rrently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded.
Hunsaker & Associates
RJ Lung & Associates
C 40695
1.3 All engineering and survey
N/A (No license required for Aerial Photogrammetry)
03/31/2025 661-294-2211
714-832-2077
Civil Engineering, Survey
Aerial Photogrammetry
26074 Avenue Hall, Suite 23 Valencia, CA 91355
2832 Walnut Ave, Suite E Tustin, CA 92780
$165,615
$11,340
1000008697
1000031076
28 February 10, 2023
Jay Hoeschler, Design Director, Avid Trails, LLC
8. Designation of Subcontractors
REFERENCES
PROPOSAL # PPOS-22-23-P0020B
Design of the Blue Cloud Bike Park
City Project No. P0020
City of Santa Clarita, California
The following are the names, addresses, and telephone numbers of three public agencies for which proposer has performed work of a similar scope and size within the past 3 years. If the instructions on this form conflict with the references requested in the scope of work, the scope of work shall govern. Complete this form out accordingly. Fill out this form completely and upload it with your proposal.
1. __________________________________________________________________________________ Name and Address of Owner / Agency
__________________________________________________________________________________ Name and Telephone Number of Person Familiar with Project
__________________________________________________________________________________ Contract Amount Type of Work Date Completed
2. __________________________________________________________________________________ Name and Address of Owner / Agency
__________________________________________________________________________________ Name and Telephone Number of Person Familiar with Project
__________________________________________________________________________________ Contract Amount Type of Work Date Completed
3. __________________________________________________________________________________ Name and Address of Owner / Agency
__________________________________________________________________________________ Name and Telephone Number of Person Familiar with Project
__________________________________________________________________________________ Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from w hom Proposer intends to procure insurance bonds:
_____________________________________________________________________________________
_____________________________________________________________________________________
ACKNOWLEDGEMENT & ACCEPTANCE OF SCOPE OF WORK
PROPOSAL # PPOS-22-23-P0020B
Design of the Blue Cloud Bike Park
City Project No. P0020
City of Santa Clarita, California
By providing the three (3) required signatures below, the Contractor acknowledges full understanding, complete agreement to, and accepts in its entirety, all Scope of Work for the Design of the Blue Cloud Bike Park. The Contractor will be expected to perform maintenance practices and uphold the standards herein to the established Scope of Work throughout the length of the contract.
*Supervisor’s Signature:___________________________________________Date:__________
*Estimator’s Signature:____________________________________________Date:__________
*Owner’s Signature:______________________________________________Date:__________
*All three signatures required
City of West Jordan Wheels Park 8000 S Redwood Rd, West Jordan, UT 84088 Gateway Bike Park 4806 Old Spartanburg Rd. Taylors, SC 29687 City of Orem Bike Park 56 North State Street, Orem, UT 84057 Korban Lee 801-569-5071 [email protected] Ty Houck 846-331-9631 [email protected] Jennica Jones 801-229-7295 [email protected]
$5 million Design + Build In Progress
$30,000 Design Fall 2021
$90,000 Design + Build May 2021
Diane Gibson, Westfield Insurance, 1 Park Circle Westfield Center, OH 44251 704-749-2402 29 02-15-2023
02-15-2023
02-15-2023
9. References 10. Acknowledgment of Scope of Work
CITY OF SANTA CLARITA DISCLOSURE STATEMENT
PROPOSAL # PPOS-22-23-P0020B
Design of the Blue Cloud Bike Park
City Project No. P0020
City of Santa Clarita, California
The following information must be disclosed:
1. List the names of all persons having a financial interest in the Request for Proposals.
2. If any person identified pursuant to No. 1 above is a corporation or partnership, list the names of all individuals owning more than ten percent of the shares in the corporation or owning any partnership interest in the partnership.
3. If any person identified pursuant to No. 1 above is a non-profit organization or a trust, list the names of any persons serving as a director of the non-profit organization or as a trustee or beneficiary or trustor of the trust.
4. Has the offeror had more than $250.00 worth of business transacted with any member of the City of Santa Clarita staff, boards, commissions, committees, and Council within the past twelve months? If yes, please indicate the person(s) with whom you have conducted business.
NOTE: Attach additional pages as necessary.
_________________________________
Signature of Offeror
_________________________________
Print or Type Name of Offeror
_________________________________
Date
EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT
PROPOSAL # PPOS-22-23-P0020B
Design of the Blue Cloud Bike Park
City Project No. P0020
City of Santa Clarita, California
The offeror hereafter described will not discriminate against any employee or applicant for employment because of race/color, national origin, sex, sexual preference, religion, age, or handicapped status in employment or the provisions of services.
________________________________________
Signature
_________________________________________
Typed Name and Title
Justin Lax, partner, Avid Trails, llc
Jay Hoeschler, partner, Avid Trails, llc
Justin Lax, partner, Avid Trails, llc
Jay Hoeschler, partner, Avid Trails, llc
N/A
N/A
Jay Hoeschler, Avid Trails llc
February 15, 2023
Jay Hoeschler, Partner, Design Director
30 11. Disclosure Statement 12. Equal Opportunity / Affirmative Action Statement
Addendum No. 1
February 2, 2023
PROPOSAL # PPOS-22-23-P0020B
Addendum No. 1
PROPOSAL # PPOS-22-23-P0020B
Design of the Blue Cloud Bike Park
City of Santa Clarita, California
This addendum must be acknowledged via BidNet and should be included with the proposal response.
The purpose of this addendum is to address the following for this Request for Proposals (RFP):
I. PRE-PROPOSAL MEETING
There will be a non-mandatory Pre-Proposal meeting on Wednesday, February 8, 2023 at 11:00 AM (PT) via Zoom. Meeting information is as follows:
https://santaclarita.zoom.us/j/88003633628
Meeting ID: 880 0363 3628
Passcode: 579145
One tap mobile
+16694449171,,88003633628# US
+13462487799,,88003633628# US (Houston)
Meeting ID: 880 0363 3628
Find your local number: https://santaclarita.zoom.us/u/kdzJeTfbvx
II. PROPOSALS DUE DATE
The closing date has been extended from February 8, 2023 at 11:00 AM (PT) to February 15, 2023 at 11:00 AM (PT). Please submit proposals before February 15, 2023 at 11:00 AM (PT), proposals submitted after the deadline will not be considered.
III. QUESTIONS
The questions deadline will not be extended on BidNet. Questions may be asked in the non- mandatory Pre-Proposal Meeting on February 8, 2023 at 11:00 AM (PT) via Zoom. Questions and answers asked during this meeting will be published in an Addendum on BidNet.
31 13. Addendum
The following addendum have been received and
acknowledged via the BidNet portal .
Questions & Answers
Buyer Organization City of Santa Clarita
Question Acceptance Deadline 01/30/2023 02:00 PM EST
Closing Date 02/15/2023 02:00 PM EST
No Question/Answer Question Date Answer Date
Q1 Question: Pre-Bid Site Visit (by Jay Hoeschler)
Will a representative of the City be available to meet bidders at the site prior to bid?
Public Answer:
There will be a non-mandatory Pre-Proposal meeting held on February 8, 2023 at 11:00 AM (PT) via Zoom. Please see Addendum No. 1 for meeting details and new closing date.
01/27/2023 09:46 AM EST 02/02/2023 02:34 PM EST
Q2 Question: Public Input (by Jay Hoeschler)
Will public input be part of the design process, either pre-design or presenting / vetting proposed designs in a public forum? Public Answer:
There will be a public meeting at the 90% design completion. 01/27/2023 09:48 AM EST 02/02/2023 01:00 PM EST
Q3 Question: Site Boundaries (by Jay Hoeschler)
Can you please provide a KMZ or SHP of the project boundaries? Public Answer:
The RFP Package contains the approximate boundaries of the project site in the Exhibits.
01/27/2023 09:49 AM EST 02/02/2023 01:00 PM EST
Q4 Question: Submittal Format (by Jay Hoeschler)
Can 11x17 recycled paper be used for printed submittals? Public Answer:
Yes, 11x17 recycled paper may be used for printed submittals. 01/27/2023 09:51 AM EST 02/02/2023 01:00 PM EST
Q5 Question: Technical Data (by Jay Hoeschler)
Does the City have data on existing geotechnical and environmental conditions for the site?
Public Answer:
There is a CEQA report being done by a City consultant. Currently, there are no geotechnical reports for the site
01/27/2023 09:51 AM EST 02/02/2023 01:00 PM EST
Q6 Question: Tech Subconsultants (by Jay Hoeschler)
Are geo and/or enviro subconsultants required as part of the project team? Public Answer:
They are not required.
01/27/2023 09:52 AM EST 02/02/2023 01:40 PM EST
PPOS-22-23-P0020B - Design of the Blue Cloud Bike Park Addendum No: 1 (Published) 02/03/2023 11:17 AM EST Page 1 of 4
No Question/Answer Question Date Answer Date
Q7 Question: Permit Procurement (by Jay Hoeschler)
Should this scope include procuring any necessary permits for construction?
Public Answer:
No, it is not necessary.
01/27/2023 09:55 AM EST 02/02/2023 01:00 PM EST
Q8 Question: Existing City Park Standards (by Jay Hoeschler) Are there parks and recreation standards for structures, toilets, benches, etc.?
Public Answer:
The project will include Porta Potty and/or forest type septic tank toilets. No standards exist.
01/27/2023 09:56 AM EST 02/02/2023 01:00 PM EST
Q9 Question: Construction Budget (by Jay Hoeschler)
Is there an overall construction budget for the project we should be designing to?
Public Answer:
The total budget, including design and construction is $3,500,000. 01/27/2023 09:57 AM EST 02/02/2023 01:00 PM EST
Q10 Question: CEQA Requirements
Does the project requires CEQA or any other related/similar clearances? Does the city have these clearances or it will be part of the scope? Public Answer:
The City is conducting CEQA.
01/30/2023 01:01 PM EST 02/02/2023 01:00 PM EST
Q11 Question: Title Report
Does the project has Title and Boundary report and city will provide them or obtaining reports are part of the scope?
Public Answer:
The City will provide title and boundary reports and any other information relating to the property to the awarded vendor.
01/30/2023 01:03 PM EST 02/02/2023 01:00 PM EST
Q12 Question: Bio and Flood Mapping
Does the city has the Biological resources map and flood map for the project and provide it or its the responsibility of the consultant to prepare them?
Public Answer:
The City has the maps and will provide them to the awarded consultant. 01/30/2023 01:04 PM EST 02/02/2023 01:00 PM EST
Q13 Question: Biological Information
Are there any Oak trees, other known biological resources, protected or sensitive habitats or endangered species on the site? Does the city have this information or is it part of the scope of work to obtain these information? Public Answer:
There are Oaks tree on site, no other SEAʼs are on site. The Oak trees are outside of the construction areas.
01/30/2023 01:08 PM EST 02/02/2023 01:00 PM EST
PPOS-22-23-P0020B - Design of the Blue Cloud Bike Park Addendum No: 1 (Published) 02/03/2023 11:17 AM EST Page 2 of 4
32 No Question/Answer Question Date Answer Date
Q14 Question: Record of Survey requirements
Way: Perform a design level topographic survey and provide mapping to establish the existing right of way for the project.
Is it correct to assume that this work shown in italics will not require a record of survey?
Public Answer:
Yes, it will not require a record of survey.
01/30/2023 01:09 PM EST 02/02/2023 01:00 PM EST
Q15 Question: Design Limits
Will we be required to design any offsite items (like access from the existing street, or entrance improvements which will also require offsite design).
Public Answer:
No offsite items will be required
01/30/2023 01:10 PM EST 02/02/2023 01:00 PM EST
Q16 Question: Geotechnical info
Is there any available Geotechnical report for the site or preparing the report is the consultant team's responsibility?
Public Answer:
There is no existing geotechnical report, and it is not the consultant's responsibility to prepare one.
01/30/2023 01:11 PM EST 02/02/2023 01:40 PM EST
Q17 Question: Existing infrastructure
In few places in the RFP its mentioned Design of existing infrastructure (ex.
Part III of Scope of work "The project shall include design of the existing infrastructure in order to obtain a final design") Would you please clarify what existing infrastructure needs to be designed/redesigned or what is this statement referring to?
Public Answer:
The existing entrance roads and utilities.
01/30/2023 01:17 PM EST 02/02/2023 01:00 PM EST
Q18 Question: Deadlines Extention
Since the response to question for this RFP can/might affect the scope of work and also need to bring new disciplines to the project team will the city extend the deadline for returning the proposals?
Public Answer:
Please see Addendum No. 1. The deadline has been changed from February 8, 2023 at 11:00 AM (PT) to February 15, 2023 at 11:00 AM (PT). 01/30/2023 01:20 PM EST 02/02/2023 02:34 PM EST
Q19 Question: Project Limits
It looks like some of this park is outside City limits? If so, who is coordinating with LA County?
Public Answer:
The City is the owner of property outside city limits and is in process of annexing property into city. The City is in contact with LA County. 01/30/2023 01:27 PM EST 02/02/2023 01:00 PM EST
PPOS-22-23-P0020B - Design of the Blue Cloud Bike Park Addendum No: 1 (Published) 02/03/2023 11:17 AM EST Page 3 of 4
No Question/Answer Question Date Answer Date
Q20 Question: Project Limits
It looks like some of this park is outside City limits? If so, who is coordinating with LA County?
Public Answer:
The City is the owner of property outside city limits and is in process of annexing property into city. The City is in contact with LA County. 01/30/2023 01:31 PM EST 02/02/2023 01:00 PM EST
Q21 Question: RFP Questions
-Can the City specify parking requirements?
-Can the design team be part of the construction/build team or will they be excluded?
-Can the project budget be shared?
-Is there a schedule for the project?
-In the RFP under Task 3: Design, there is a line item that references requested prepared plans per listed category – please confirm what these plans per categories are.
-What are the lighting requirements at the parking, trail head, and trail requirements?
-Any gates, competitive access (wifi, cable, cameras) planned? -Is all of the mentioned 15 miles for the trail, new or does it include the existing trails that are there now?
-It is understood that access roads on both the Haskell Canyon side and Blue Cloud side are to be designed. Is there an estimation on the length of roadway work is anticipated and if this road work is private, public, or a combination?
-Can the City share the CIP information?
-Does the City have or need an environmental permit and/or EIR? -Are there any limitations in terms of access or type of construction materials and equipment that can be used?
-Must the consultant prepare phasing and laydown plans? Public Answer:
1) 100 spaces are required and 4 ADA spaces are required. Paving is road based. 2) Design team may not bid on construction. 3) Total budget for project $3,500,000. This includes design and construction. 4) Design and construction to be completed in 2024. 5) There are no requirements for lighting. 6) ? Gates will be installed by the City, no wi-fi, cable, or cameras are planned. 7) There are no existing trails now. Design and construction of minimum 15 miles of trails, including expert, intermediate, and beginner are needed. 8) The road design is to start from existing roads, DWP on Haskell side, terminus of Blue Cloud Road on Blue Cloud side. 9) The road work is from the existing roads and will be public, paving is to be road base only. 10) What CIP information are you requesting? You may enter a Public Records Request at www.santa-clarita.com or by calling at (661) 259-2489. 11) The City is preparing CEQA documents. 12) There are no restrictions.
Items may include but not limited to: Trails, Pump Tracks, Jump Course; miniexcavators, trial dozers, skid steers, roads and paving. 13) No, this is not required.
01/30/2023 01:52 PM EST 02/02/2023 01:19 PM EST
PPOS-22-23-P0020B - Design of the Blue Cloud Bike Park Addendum No: 1 (Published) 02/03/2023 11:17 AM EST Page 4 of 4
33 Addendum No. 2
February 10, 2023
PROPOSAL # PPOS-22-23-P0020B
Addendum No. 2
PROPOSAL # PPOS-22-23-P0020B
Design of the Blue Cloud Bike Park
City of Santa Clarita, California
This addendum must be acknowledged via BidNet and should be included with the proposal response.
I. PRE-PROPOSAL MEETING
There was a non-mandatory, pre-proposal meeting via Zoom on February 8, 2023 beginning at 11:00 AM (PT). The pre-proposal meeting details are as follows:
Attending Staff:
• Jeff Morrison – Open Space and Trails Administrator, Neighborhood Services • Danielle Marquez - Buyer, Administrative Services
Attending Vendors:
• Trent Okumura – BrightView Design Group
• Jerico Farfan – BrightView Design Group
• Tim Garrett – KPFF Consulting Engineers
• Justin Lax – Avid Trails
• Jay Hoeschler – Avid Trails
• Alireza Sazegari – Hunksaker & Associates
• Grant Kai – KPFF Consulting Engineers
• Jason Fukumitsu – Hunksaker & Associates
• Jeannine Mowrey – Hunsaker & Associates
• Sustainable Recreation Design
• Armando Arroyo
The following questions were asked and answered:
Q1) There was an estimate developed by Bellfree, is that how the budget of $3.5 million was established?
A1) Yes, correct. In the budget, there is a $95,000 set apart for design.
Q2) Does the design portion of the budget also include design for the bike park and BMX race track? A2) Proposals will need to include a preliminary estimate for a USA BMX certified race track per the Scope of Work, Section III “Responsibilities”.
Q3) Is the preliminary investigation a part of the base scope? A3) Yes, this is Task #1 in the Scope of Work.
Addendum No. 2
February 10, 2023
PROPOSAL # PPOS-22-23-P0020B
Q4) What level does the City require the BMX bike track to be designed? A4) The City requires a cost estimate for a USA BMX certificated, sanctioned race track.
Q5) Is the current Santa Clarita Sports Complex Park not sanctioned for BMX park? A5) Correct, it is not sanctioned.
Q6) Is the design process limited to the trail system itself or is the design for parking lots, bathrooms, etc. included in the $95,000 estimate?
A6) Yes, this will be included – see estimate breakdown attached to this addendum.
Q7) Can you clarify if the design topography is required in this RFP? A7) Yes, the City will need design level topography.
Q8) Is the design topography detail needed for the entire park for trail alignments? A8) Yes, this will be needed.
Q9) In regards to public input, how did you arrive at the design parameters for this project? A9) There will be two public meetings to allow the community to choose between different options of design elements.
Q10) Also in regards to public participation, does this mean we should plan a design A and B for public input?
A10) The City is looking for design elements to show to the public, not quite the trail itself, but the elements of the trails.
Q11) For the trails, are you expecting a mini excavator and do you have an anticipated trail path? A11) The trail path shouldn’t be anything too elaborate, but the proposal should include design for trail paths that will be created by a mini excavator.
Q12) How are the funds for this project being paid?
A12) General Fund.
Q13) Is the consultant responsible for obtaining permits? A13) The City will obtain the permits for the selected consultant.
Q14) Will design happen prior to CEQA completion?
A14) CEQA will be happening simultaneously during design, but will be completed before construction.
Q15) Are we allowed to visit the site of Blue Cloud Park? A15) Yes, you can visit the site. The City has provided clearance for visitors from dawn to dusk. See attached picture included in this addendum. Visitor cars will need to be parked near the green gate shown in the picture and walk to the site from there.
34 Addendum No. 2
February 10, 2023
PROPOSAL # PPOS-22-23-P0020B
Q16) Does the City anticipate this space being used as a NICA venue? A16) Yes, the City plans on using the park for events, practices, and as an active venue space.
Q17) Are we to include the trails as a part of our proposal? A17) Yes, include preliminary illustratives.
Q18) Is it a requirement to subcontract the City’s preferred subconsultant mentioned in the Scope of Work, or does the City just recommend collaboration?
A18) It is the City’s preference, but we are open to other consultants that are equivalent.
Q19) Do we need to consider Ryan Howard’s fees within our proposal? A19) Not Ryan Howard’s fees specifically, but the City would like to see a portion dedicated to a subconsultant that possesses similar expertise.
Q20) What level of construction document detail is the City expecting for the trail themselves? A20) The City is not looking for full engineering on the construction, but rather a design that is sustainable.
Q21) Are you open to the trail drawings on topography maps? A21) Yes, that’s fine.
Q22) The design team will not be contracted to build it, is that policy? A22) Yes, the selected consultant for this RFP will be utilized to design Blue Cloud Park, but cannot participate in the bid for construction due to conflict of interest concerns.
Q23) What’s the reasoning for not contracting out for design-build? A23) The City attempted to solicit proposals for this project using the design-build approach in October 2022, but did not receive any proposals. Due to this fact, we are contracting the design and construction separately.
Q24) Can you provide the contact information for Ryan Howard? A24) Yes, please see Section III, “Trek Bikes Representative”, within this addendum for the contact information.
Q25) Does the $100,000 design estimate include surveying? A25) Yes.
Q26) How critical is it that you get hard copy proposal submissions? A26) The City will be removing the hard copy submission requirement for this RFP. See Section II: “Hard Copy Proposal Submission Requirement”.
Addendum No. 2
February 10, 2023
PROPOSAL # PPOS-22-23-P0020B
Q27) Does the City require all subconsultants to be put on the Designation of Subcontractors/Subconsultants form?
A27) Per the Designation of Subcontractors/Subconsultants form, we are requesting a list of vendors who will perform work or labor or render service in excess of ½ of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subconsultants will be used fill out the form with N/A.
Q28) Will a geotechnical report be required?
A28) No.
Q29) Will you be open to phasing plans for this project? Q29) No, there will be no phasing in this project.
Q30) How critical is lidar on this bike trail?
A30) Lidar is not required, but normal survey will be accepted.
Q31) What will the evaluation team look like?
A31) There will only be City staff on the evaluation panel.
The following was reviewed:
• Project scope of work
• RFP Guidelines
• Q & A Session
II. HARD COPY PROPOSAL SUBMISSION REQUIREMENT
The hard copy submission requirement for this RFP has been removed. The City must receive one (1) electronic copy of the completed proposal before 11:00 AM (PT) on February 15, 2023. All proposal submissions must be submitted via BidNet.
III. TREK BIKES REPRESENTATIVE – CONTACT INFORMATION
The City’s Trek Bikes representative, Ryan Howard, contact information is below:
Ryan Howard
(831) 214-4868
[email protected]
IV. ADDENDUM ATTACHMENTS
• Bellfree Contractors Engineer’s Estimate
• Picture of Blue Cloud Park Gate Access
35 Addendum No. 2
February 10, 2023
PROPOSAL # PPOS-22-23-P0020B
END OF ADDENDUM
This addendum must be acknowledged via BidNet and should be included with the response.
____________________________________ ____________ Contractor’s Representative Date
____________________________________
Company Name
CITY OF SANTA CLARITA
OPEN SPACE
BLUE CLOUD BIKE PARK
BELLFREE CONTRACTORS ‐ TRAIL BUILDERS
ENGINEERS ESTIMATE
Item Amenity Description Cost
1 Bike Park Design $95,000
2 15 miles of trails for beginner, intermediate, and advanced. 79,200 LF. $1,663,200 Includes jumps, bermed turns, lumber elements, rock armoring, rock elements.
3 Pro Rider Consultant $100,000
4 Bike Park features; a dirt jump course with wood ramps, a beginner pump track, an advanced pump track, pump tracks will be asphalt surfaced.
$950,000
5 Parking lot on Haskell side; 100 parking spaces, including 4 on concrete slab ADA spaces, parking stoppers, signage.
$108,000
6 Two concrete vault toilets, 8 picnic tables, 10 benches, 8 trees, 4 bear‐ saver trash cans, 1 pet waste station, 4 bike repair stations, 6 six bike racks.
$76,000
7 Access road improvements; grading, drainage, gravel and rock armoring.
$64,000
8 Grading and base material for Harris side parking for 40 cars. $160,000 9 City Add/Alternates; shade structures, signage, fencing, water tank, gates, storage container, etc.
$300,000
TOTAL $3,516,200