Cities Index.
Bid Proposal for Sully-Miller Contracting, Co. (available in the City Clerk's Reading File)

Santa Clarita City Council
April 11, 2023

Document
Bid Proposal for Sully-Miller Contracting, Co. (available in the City Clerk's Reading File)
Meeting
April 11, 2023
Body
Santa Clarita City Council
Pages
3
Original file
43.6 MB
Text extracted from the city's file for reading and search. Open the original on santaclaritacityca.iqm2.com. That file is the official record.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
The bidder under penalty of perjury, certified that except as noted below, he/she or any person associated therewith in the capacity of owner, partner, director, office manager:
is not currently under suspension, debarment, voluntary exclusion or determination of ineligibility by any federal AGENCY;
has not been suspended, debarred, voluntarily excluded, or determined ineligible by any federal AGENCY within past three years;
does not have a proposed debarment pending; and
has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 10 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

None
Exceptions will not necessarily result in denial of award but will be considered in determining bidders' responsibility. For any exception noted above, indicate below to whom it applies, initialing AGENCY, and dates of action.

None
The Contractor further certifies that it shall not knowingly enter into any transaction with any subcontractor, material supplier, or vendor who is debarred, suspended, declared ineligible, or voluntarily excluded from covered transactions by any federal or state department/agency.

NOTE: Providing false information may result in criminal prosecution or administrative sanctions.

The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signat fi this Confaation Company
Bidder:

Signature
Title Jeff Galterio, Assistant Secretary
DocuSign Envelope ID: CA9C2A6A-9351-4BE2-94FD-FA630C834797 Addendum No. 1
March 2, 2023
Addendum No. 1
BID # CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City of Santa Clarita, California
This addendum must be acknowledged via BidNet and should be included with the bid response.

The purpose of this addendum is to address the following for this Bid:

I. UPDATE PREVAILING WAGE RATES
Please see the attached updated Federal Prevailing Wage Rates.

II.FINALIZED SIGNING AND STRIPING PLANS
Please see the attached finalized signing and striping plans.

Apprasadby
Damon Lets
Damon te...

City Engineer

END OF ADDENDUM
This addendum must be acknowledged via BidNet and should be included with the response.

Skalter's
March 2, 2023
Date
Jeff Galterio, Assistant Secretary
Sully-Miller Contracting Company
-
Company Name
BID # CIP-22-23-M0142
DocuSign Envelope ID: 9C987C6B-CA37-49A7-8E17-B408EEAD0BE1 Addendum No. 2
March 9, 2023
Addendum No. 2
BID # CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City of Santa Clarita, California
This addendum must be acknowledged via BidNet and should be included with the bid response. The purpose of this addendum is to address the following for this bid:

1. BID CLOSING DATE CHANGE
The bid closing date has been changed from March 9, 2023 before 2:00 PM (PT) to March 13, 2023 before 2:00 PM (PT).
pproved
DocuSigned b
Vamon Ltz 3/9/2023
City Engineer

END OF ADDENDUM
This addendum must be acknowledged via BidNet and should be included with the response.

IlLaltena
March 9, 2023
Contractor's Representative Date
Jeff Galterio, Assistant Secretary
Sully-Miller Contracting Company
Company Name
BID # CIP-22-23-M0142
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8 Addendum No. 3
March 10, 2023
Addendum No. 3
BID # CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City of Santa Clarita, California
This addendum must be acknowledged via BidNet and should be included with the bid response. The purpose of this addendum is to address the following for this bid:

1. BID CLOSING DATE CHANGE
The bid closing date has been changed from March 13, 2023 before 2:00 PM (PT) to March 14, 2023 before 2:00 PM (PT).

II. INCLUSION OF COVER SHEET FOR PLANS
Please see the attached complete plans set that was originally missing the signed cover sheet.

III. UPDATED BID SCHEDULE
Please see the attached updated Bid Schedule. Line Item # 6 for Base Bid, Alternate 1, and Alternate 2 have been updated to the following: ARHM-GG-C instead of ARHM-GG-D This updated Bid Schedule must be filled out and submitted with the bid response.

IV. UPDATED GENERAL PROVISIONS
Please see the updated Section F - General Provisions. The following sections have been updated:
• Removed section 400-2 (previously page GP-65)
• Updated sections 3-10.1, 3-10.4 (page GP-22)
V. UPDATED SPECIAL PROVISIONS - TECHNICAL
Please see the updated Section G - Special Provisions - Technical. The following sections have been updated:
• Section G2-5.4 (page 18)
• Section G2-8.2.2 (page 26)
Approved:

DocuSigned by:

Damon Lets
Damon bet...

City Engineer
BID # CIP-22-23-M0142
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8 Addendum No. 3
March 10, 2023

END OF ADDENDUM
This addendum must be acknowledged via BidNet and should be included with the bid response.

Wl alters
March 13, 2023
Contractor's Representative Date
Jeff Galterio, Assistant Secretary
Sully-Miller Contracting Company
Company Name
BID # CIP-22-23-M0142
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

SECTION C
Bid Submittals
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

PROPOSAL FORM
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
TO THE CITY OF SANTA CLARITA, AS CITY:

In accordance with CITY's NOTICE INVITING BIDS, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated project as set forth in the plans, specifications, and contract documents therefore, and to perform all work in the manner and time prescribed therein.

BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, INSTRUCTIONS TO BIDDERS, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with CITY at the unit and/or lump sum prices set forth in the following BID SCHEDULE. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to CITY of the proposal guarantee accompanying this proposal.

BIDDER understands that a bid is required for the entire work that the estimated quantitles set forth in BID SCHEDULE are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or ump sum price(s) bid include all appurtenant expenses, taxes, royalties, and fees for the project's duration. in case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures If awarded the contract, the undersigned further agrees that in the event of the Bidder's default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the CITY's notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the CITY and this bid and the acceptance hereof may, at the CITY's option, be considered null and void.

Company Name: Sully-Miller Contracting Company
Company Address: 135 S. State College Blvd., Ste. 400
Brea, CA 92821
Phone: 714/578-9600
Email: [email protected]
By: Jeff Galterio
Print Name
Title: Assistant Secretary
I Salterio
Signature:

Date: February 23, 2023
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the locument to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document State of California
County of Orange )
On March 4, 2023 before me, _ J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

J. DANIELS
Notary Public - California
Orange County
Commission # 2377975 Signature.

My Comm. Expires Oct 9, 2025 Signature of Notary Public J. Daniels, Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached DoCid Proposal-Signature Page
Title or Type of Document: Document Date: February 23, 2023 Number of Pages: _ 1 Signer(s) Other Than Named Above:

Capacity(ies) Claimed by Signers)
Signer's Name: Jeff Galterio Signer's Name:

X Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:
signer Is Representing: Signer Is Representing:

Sully-Miller Contracting Company
xecut 000000000000000000000000000000 xan c00, 000000000x ©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2AD8942F288

NOTICE TO BIDDERS REGARDING CONTRACTUAL REQUIREMENTS
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California

SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS

1. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions as deemed appropriate by City's Purchasing Agent.

Questions and requests for modification of these terms must be negotiated and approved prior to bid submission and are at the full discretion of the City.

2. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor's liability under this agreement. The full coverage and limits afforded under Contractor's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required.

The Insurance obligations under this agreement shall be: 1-all the Insurance coverage and limits carried by or available to the Contractor; or 2—the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City.

3. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CL policy listing all policy endorsements to City before work begins. City reserves the right to require full-certified copies of all Insurance coverage and endorsements.

I. INDEMNIFICATION:

City and its respective elected and appointed boards, officials, officers, agents, employees, and volunteers (individually and collectively, "Indemnitees") shall have no liability to CONTRACTOR or any other person for, and CONTRACTOR shall indemnify, defend, protect, and hold harmless Indemnitees from and against, any and all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs, and expenses of whatever nature, including reasonable attorney's fees and disbursements (collectively, "Claims"), which Indemnitees may suffer or incur or to which Indemnitees may become subject by reason of or arising out of any injury to or death of any person(s), damage to property, loss of use of property, economic loss, or otherwise occurring as a result of or allegedly caused by the CONTRACTOR'S performance of or failure to perform any services under this Agreement, or by the negligent or willful acts or omissions of CONTRACTOR, its agents, officers, directors, or employees, committed in performing any of the services under this Agreement.

If any action or proceeding is brought against Indemnitees by reason of any of the matters against which CONTRACTOR has agreed to indemnify Indemnitees as provided above, CONTRACTOR, upon notice from City, shall defend Indemnitees at its expense by counsel acceptable to City, such acceptance not to be unreasonably withheld. Indemnitees need not have first paid for any of the matters to which Indemnitees DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 are entitled to indemnification in order to be so indemnified. The limits of the insurance required to be maintained by CONTRACTOR in this Agreement shall not limit the liability of CONTRACTOR hereunder. The provisions of this section shall survive the expiration or earlier termination of this agreement.

The provisions of this section do not apply to Claims occurring as a result of the City's active negligence or acts of omission.

II. INSURANCE
CONTRACTOR shall maintain and submit certificates of all applicable insurance including, but not limited to, the following and as otherwise required by law. The terms of the insurance policy or policies issued to provide the above insurance coverage shall provide that said insurance may not be amended or canceled by the carrier, for non-payment of premiums or otherwise, without thirty (30) days prior written notice of amendment or cancellation to the CITY. In the event the said insurance is canceled, the CONTRACTOR shall, prior to the cancellation date, submit to the City Clerk new evidence of insurance in the amounts Liability Insurance
During the entire term of this Agreement, the CONTRACTOR agrees to procure and maintain General Liability insurance at its sole expense to protect against loss from liability imposed by law for damages on account of bodily injury, including death therefrom, suffered or alleged to be suffered by any person or persons whomsoever, resulting directly or indirectly from any act or activitles, errors or omissions, of the CITY, or CONTRACTOR or any person acting for the CITY, or under its control or direction, and also to protect against loss from liability imposed by law for damages to any property of any person caused directly or indirectly by or from acts or activities of the CITY, or CONTRACTOR or any person acting for the CITY, or under its control or direction. Such public liability and property damage insurance shall also provide for and protect the CITY against incurring any legal cost in defending claims for alleged loss. Such General, Public and Professional liability and property damage insurance shall be maintained in full force and effect throughout the term of the Agreement and any extension thereof in the amount indicated above or the following minimum limits:

Commercial General Liability Insurance, including coverage for Premises and Operations, Contractual Liability, Personal Injury Liability, Products/Completed Operations Liability, and Independent Contractors' Liability (if applicable), in an amount of not less than two million dollars ($2,000,000.00) per occurrence, four million dollars ($4,000,000.00) annual aggregate, written on an occurrence form.

Products/Completed Operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the CONTRACTOR for covered claims arising out of the actlons of Independent contractors. If the CONTRACTOR is using subcontractors, the policy must include work performed by or on behalf" of the CONTRACTOR. Policy shall contain no language that would invalidate or remove the CONTRACTOR'S duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the CONTRACTOR.

Worker's Compensation Insurance
The CONTRACTOR shall procure and maintain, at its sole expense, Worker's Compensation Insurance in the amount of $1,000,000 per occurrence or in such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for both the CONTRACTOR and the CITY against any loss, claim or damage arising from any injuries or occupational diseases happening DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 to any worker employed by the CONTRACTOR in the course of carrying out the work within the Agreement. Such insurance shall also contain a waiver of subrogation naming the City of Santa Clarita.

Automotive Insurance
The CONTRACTOR shall procure and maintain, at its sole expense, throughout the term of this Agreement, and any extension thereof, public liability and property damage insurance coverage for automotive equipment with coverage limits of not less than $1,000,000 combined single limit for each accident. All such insurance shall be primary insurance and shall name the City of Santa Clarita as an additional insured.

Builder's Risk
Upon commencement of construction and with approval of CITY, CONTRACTOR shall obtain and maintain Builder's Risk Insurance for the entire duration of the Project until only the CITY has an insurable interest.

The Bullder's Risk coverage shall Include the coverages as specified below:

The named insureds shall be CONTRACTOR and CITY, including its officers, officials, employees, and agents. All subcontractors (excluding those solely responsible for design work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to CITY.

The policy shall contain a provision that all proceeds from the Builder's Risk Policy shall be made payable to the CITY. The CITY will act as a fiduciary for all other interests in the Project.

Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project.

There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include:
(1) coverage for any ensuing loss from faulty workmanship, nonconforming work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the site or any staging area. Such insurance shall be on a form acceptable to CITY to ensure adequacy of terms and sub-limits and shall be submitted to the CITY prior to commencement of construction.

Fire and Extended Coverage Insurance (Services involving real property only) CONTRACTOR agrees to procure and maintain, at its sole expense, during the term of this Agreement, and any extension thereof, a policy of fire, extended coverage and vandalism insurance.

Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions Contractors Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions with limit no less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of one year.

Coverage must be included for bodily injury and property damage, including coverage for loss of use and/or diminution in property value, and for clean-up costs arising out of, pertaining to, or in any way related to the actual or alleged discharge, dispersal, seepage, migration, release or escape of DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 contaminants or pollutants, arising out of or pertaining to the services provided by CONTRACTOR under this Agreement, including the transportation of hazardous materials or contaminants.

Professional Liability (if Design-Build)
Professional Liability Insurance, insuring against professional errors and omissions arising from CONTRACTOR'S work on the Project, in an amount not less than [$2,000,000] combined single limit for each occurrence. If CONTRACTOR cannot provide an occurrence policy, CONTRACTOR shall provide insurance covering claims made as a result of performance of work on this Project and shall maintain such insurance in effect for not less than three years following final completion of the Project.

Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against the CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing Insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against the CITY, and shall require similar written express waivers and Insurance clauses from each of its subconsultants.

Separation of Insureds
A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR'S insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer's limits of liability. The pollcy(ies) shall not contain any cross-liability exclusions.

Pass Through Clause
CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. CONTRACTOR agrees that upon request, all Agreements with consultants, subcontractors, and others engaged in the project will be submitted to the CITY for revlew.

Self-Insured Retentions
Any self-insured retentions must be declared to and approved by the CITY. The CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the CITY.

Primary and Additional Insured
All of such insurance shall be primary and shall name the City of Santa Clarita as additional insured. A Certificate of Insurance and an additional insured endorsement (for general and automobile liability), evidencing the above insurance coverage with a company acceptable to the City's Purchasing Agent shall be submitted to the CITY prior to execution of this Agreement on behalf of the CITY.

Requirements
Should CONTRACTOR, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain coverage at CONTRACTOR'S expense and deduct the cost of such insurance DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 from payments due to CONTRACTOR under this Agreement or terminate. In the alternative, should CONTRACTOR fail to meet any of the insurance requirements under this Agreement, CITY may cancel the Agreement immediately with no penalty.

Should CONTRACTOR'S insurance required by this Agreement be canceled at any point prior to expiration of the policy, CONTRACTOR must notify CITY within 24 hours of receipt of notice of cancelation.

Furthermore, CONTRACTOR must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancelation. CONTRACTOR must ensure that there is no lapse in coverage.

If the operation under this Agreement results in an increased or decreased risk in the opinion of the City's Purchasing Agent, then the CONTRACTOR agrees that the minimum limits herein above designated shall be changed accordingly upon request by the City's Purchasing Agent.

The CONTRACTOR agrees that provisions of this paragraph as to maintenance of insurance shall not be construed as limiting in any way the extent to which the CONTRACTOR may be held responsible for the payment of damages to persons or property resulting from the CONTRACTOR'S activities or the activities of any person or persons for which the CONTRACTOR is otherwise responsible.

I have read and understand the above requirements and agree to be bound by them for any work performed for the City.
untre stone Of batteris Date: February 23, 2023
Printed Name: _Jeff Galterio, Assistant Secretary
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange
On _ March 4, 2023 before me, _ J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

J. DANIELS
WITNESS my hand and official seak
Notary Public - California
Orange County
Commission # 2377975
My Comm. Expires Oct 9, 2025 А бани
Signature
Daniels, Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. )escription of Attached Documen!
Title or Type of Document: Notice to Bidders Regarding _ Document Date: February 23, 2023 Number of Pages: _ Signers bRe than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:
* Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:
igner Is Representing Signer Is Representing:

Sully-Miller Contracting Company
xưccưеюююt0,00с0000000000000000000000090000000000000008 ©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8

BID SCHEDULE
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
Fill out this form completely and submit with the bid response. Line item pricing must be entered on BidNet. In the event any mathematical discrepancies are found, please refer to Section B, Bid Instructions.

The award of contract, if made, will be to the lowest responsive BIDDER determined solely by the AGENCY.

The AGENCY also reserves the right to add/delete the quantities to the existing bid items, or delete the entire bid item if they are found not required by the Agency during the course of the construction, or add new bid items or scope of work by Contract Change Order at any time during the project up to the last contract working day.

The BIDDER agrees to hold all unit prices in this Bid Schedule constant throughout the duration of the project up to the last contract working day.

BASE BID
ITEM

DESCRIPTION QTY UNIT UNIT PRICE TOTAL
NO.

1. Mobilization, Bonds & Insurance 1 LS
$84,500.00 $ 44,500.00

2. Traffic Control 1 LS
$ 200,000.00 $ 200,000.00

3. Storm Water Pollution Control Program 1 LS $
$15,000.00 15,000.00

4. AC D2 PG 64-10 1,947 TN
$ 134.00 $ 260,548.00

5. AC C2 PG 64-10
1,197 TN $129.00
$ 154,413.00

6. ARHM-GG-C PG 64-16
6,842 TN $ 142.00 $971,564.00
Remove & Replace 4" AC
33,674 SF $4.00
$ 134,696.00

8. Remove & Replace 6" AC
117,760 SP $ 5.10
$ 600, 576.00
Cold Plane 2" / Transition Cold Plane from
2" to 4" 86,986 SF $ $
•75 65,239.50

10. Stabilization Allowance
15,144 SF $ 7.75
$ 117,366.00

11. Keycut A1
12,123 LF $ 3.00
$ 36,369.00

12. Keycut B1
347 LF §1.c0 $
5,55 2.00

13. Lower Manhole Covers to Finish Grade 31 EA $
$ 554.00 17, 174.00

14. Adjust Manhole Covers to Finish Grade EA
31 $610.00
$ 18,910.00
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8

15. Install Blue RPM's @ Fire Hydrant 15 EA
$ 20.00 $ 300.00

16. 12" White Crosswalk/Limit Line (Thermo)
1,058 LF $ 4.00 § 4,232.00

17. 12" Yellow Crosswalk/Limit Line (Thermo) 477 LF
$ 4.00 $ 1,90800

18. Striping Detail #12 (Thermo & Markers) 13,678 LF $1.0o $ 13,678.00

19. Striping Detail #22 (Thermo & Markers) 631 LF $-300 $ 1.893.00

20. Striping Detail #24 (Thermo & Markers) 9,240 LF
$ 1.50 $ 13,560.00

21. Striping Detail #27 (Thermo & Markers) 52 LF
$ 3.00 $ 156.00

22. Striping Detail #38 (Thermo & Markers) 1,447 LF
$ 3.00 $ 4,341.00

23. Striping Detail #38A (Thermo) 2,225 LF
$3.00 § 6,675.00

24. Striping Detail #39 (Thermo) 12,040 LF
$1.50 $ 1$,060.00

25. Striping Detail #39 (Thermo) 960 LF
$1.50 $ 1,440.00

26. Arrow Type IV (L/R) (Thermo) 30 EA
$ 4,500.00
Legend "CLEAR"

27. 3 EA $ 430.00
$ 1,290.00

28. Legend "KEEP" 3 EA
$ 300c $ 900.00

29. Legend "AHEAD" 7 EA
$ 430.00 $ 3,010.00

30. Legend "SIGNAL" 7 EA
$ 370.00 $ 2,540.00

31. Bike & Arrow Symbol 9 EA
$ 560.00 $ 5,040.00
Remove and Install Permanent Traffic

32. Loops 99 EA $
58000 57,420.00

33. Install Temporary Video Detection System 14 EA
$ 5,000.00 $ 70,000.00

34. Remove and Install Traffic Nodes 8 EA
$ 2,500.00 $ 20,000.00

35. Remove and Replace Local Depressions 357 SF $ 15.00 $20,775.00 TOTAL BASE BID AMOUNT: $2,940,325.50
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8

ALTERNATE BID SCHEDULES
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
ALTERNATE 1
ITEM

DESCRIPTION QTY UNIT UNIT PRICE TOTAL
NO.

Mobilization, Bonds & Insurance 1 LS $
$ 15.000.00 15,000.00

2. Traffic Control 1 LS
$ 72,50000
Storm Water Pollution Control Program 1 LS $
$ 500.00 S00 co
AC D2 PG 64-10 228 TN $
142.00 $ 32, 376.00
AC C2 PG 64-10
1,745 TN $ 200, 675.00
115.00
ARHM-GG-C PG 64-16 800
TN $ 145.00 $ ili, 000.00
Remove & Replace 4" AC $
8,708 SF $ 26,124.00

3.000
Remove & Replace 6" AC
2,654 SF $7.00 § 18,578.00
Remove & Replace 8" AC
6,138 SF $ 6-00 $36, 825.00

10. | Stabilization Allowance
1,750 SF $ 43.10 $ 14,175.00
Cold Plane 2-1/2"

11. 12,575 SF $ •75 $ 4,431.25
Cold Plane 3" / Transition Cold Plane

12. from 3" to 5" 20,379 SF $ $
-50
10,184.50
Cold Plane 8" / Transition Cold Plane

13. from 8" to 10' 20,125 SF $ $

1.70 26,162.50

14. Keycut B1 90 LF $ $

16.00 1,440.00
Lower Manhole Covers to Finish Grade $ $

15. 1 EA
550.00 550:00

16. Adjust Manhole Covers to Finish Grade 1 EA $
$ 30000 300.00

17. 12" White Crosswalk/Limit Line (Thermo) 87 LF
$ 3:80 $ 330.80

18. 12" Yellow Crosswalk/Limit Line (Thermo) 510 LF
$ 3.85 $ 1,463.50

19. Striping Detail #12 (Thermo & Markers) 1,518 LF
$ 1.25 $ 1,897.50

20. Striping Detail #22 (Thermo & Markers) 867 LF S

2.90 $ 2,514.30

21. Striping Detail #38 (Thermo & Markers) 159 LF
$ 2.75 $ 437.25

22. Striping Detail #38A (Thermo) 1,274 LF
$1.50 $ 1,911.00
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8 Arrow Type IV (L/R) (Thermo) $

23. 8 EA $
150.00 1,200.00
Remove and Install Permanent Traffic

24. Loops 16 EA
695.00 il, izoco
Install Temporary Video Detection

25. System 3 EA $
4, 55000 13,650.00
TOTAL ALTERNATE 1 BID AMOUNT: $365,453.40
ALTERNATE 2
ITEM

DESCRIPTION QTY UNIT UNIT PRICE TOTAL
NO.

1. Mobilization, Bonds & Insurance LS $
1 14,000.00 11,000.00

2. Traffic Control LS S $
1 15,000.00 15,000.00
Storm Water Pollution Control Program 1 LS
500 c0 $ 500.00
AC D2 PG 64-10 276 TN
130.00 $ 35,580.00

5. AC C2 PG 64-10 930 TN $
110.00 $ 102, 30000
ARHM-GG-C PG 64-16 970 TN
$ 145.00 $ 140,650.00

7. Remove & Replace 5" AC SF $
11,174 4.00
44,696.00
Remove & Replace 8" AC
4,871 SF $ 8.00
$ 30,46800
Stabilization Allowance
oi 1,605 SF $8.00
$ 12,840.00
Cold Plane 3" / Transition Cold Plane from

10. 3" to 5" 21,400 SF $ $
•50 10,700.00
Cold Plane 3-1/2" / Transition Cold Plane

11. from 3-1/2" to 5-1/2" 20,260 SF $ $
$50 10,130.00

12. Keycut B1 90 LF $

16.00 $ 1,440.00

13. Lower Manhole Covers to Finish Grade 2 EA
§ 54000 $ 1,080.00

14. Adjust Manhole Covers to Finish Grade 2 EA
$ 600.00 $ 1,200.00

15. 12" White Crosswalk/Limit Line (Thermo) 304 LF
$ 3.50 $ 1,155.20

16. 12" Yellow Crosswalk/Limit Line (Thermo) 338 LF
$3.80 $ 1,284.40

17. Striping Detail #12 (Thermo & Markers) 1,610 LF
$ 1.25 $ 2,012.50

18. Striping Detail #22 (Thermo & Markers) 942 LF
$2.90 $ 2,731.80
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8 Striping Detail #27 (Thermo & Markers)

19. 874 LF $ 2.90 $ 2,534.60

20. Striping Detail #38 (Thermo & Markers) 206 LF $ 2.75 $ 566.50
Striping Detail #38A (Thermo)

21. 450 LF $ 2.75 $1,237.50

22. Arrow Type IV (L/R) (Thermo) 4 EA
$ 154.00 $616.00
Remove and Install Permanent Traffic

23. Loops 8 EA $
650.00 3.200.00

24. Install Temporary Video Detection System 2 EA $
$ 6,20000 12,40000
TOTAL ALTERNATE 2 BID AMOUNT: $456,122.50
The award of contract, if made, will be to the lowest responsive BIDDER determined solely by the AGENCY.

The AGENCY also reserves the right to add/delete the quantities to the existing bid items, or delete the entire bid item if they are found not required by the Agency during the course of the construction, or add new bid items or scope of work by Contract Change Order at any time during the project up to the last contract working day.

The BIDDER agrees to hold all unit prices in this Alternate Bid Schedule constant throughout the duration of the project up to the last contract working day.

Docusign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

BID SCHEDULE SUMMARY
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
BIDDER NAME: Sully-Miller Contracting Company

BID SUMMARY
$

TOTAL PRICE IN
FIGURES 2,940,325.50

BASE BID
TWO mILION NINE HUNDRED FORTY TENANT

TOTAL PRICE IN

WORDS THREE HUNDRED TWENTY-FINS DOLARS
AND FIFTY CENTS.
$

TOTAL PRICE IN
FIGURES 565,853.40
ALTERNATE 1

TOTAL PRICE IN FIVE HUNDRED SIXTY-FIJE TOUSANA

EIGHT HUNDRED FETY THESE DOLLARS

WORDS AND COOTY CENTS,
$
TOTAL PRICE IN 456,122.50

FIGURES
ALTERNATE 2
FOR HUNDRED FIFTY-SiX THOUSAND ONE

TOTAL PRICE IN HUNDRED TWENTY-TWO DOLLARS AND
WORDS FIFTY CENTS.
$

TOTAL PRICE IN
FIGURES 3,962,301.40
TOTAL BASE BID +
ALTERNATE 1 AND THESS MILLION NINE HUNDRED SIXTY-TOO
ALTERNATE 2

TOTAL PRICE IN THOUSAND THESE HUNDRSA ONE DOLLARS
WORDS AND FORTY CENTS.

NOTE: In case of error in extension of price into the total price column, the unit price will govern. The basis of award of contract shall be the Contractor's Base Bid plus the Alternates.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F288

BIDDER'S INFORMATION AND CERTIFICATION
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
Bidder certifles that the representations of the bid are true and correct and made under penalty of perjury.

EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE
Bidder certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any CITY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

AFFIRMATIVE ACTION CERTIFICATION
Bidder certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, Bidder certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents.

CERTIFICATION REGARDING DIR CONTRACTOR/SUBCONTRACTOR REGISTRATION By my signature hereunder, as the Contractor, I certify that Contractor, and all Subcontractors listed on the Subcontractor Designations form are the subject of current and active contractor registrations pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code. Contractor's registration number is indicated below. Subcontractors' registration numbers are indicated on the Subcontractor Designations form.

Bidder's Name: _ Sully-Miller Contracting Company
Business Address: 135 S. State College Blvd., Ste. 400, Brea, CA 92821 Telephone No.: 714/578-9600
State CONTRACTOR's License No. & Class: 747612-A
DIR No.: 1000003664
Original Date: December 10, 2014 Expiration Date: June 30,2024 The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partiease e area ched ericate of in cum encincipal interest in this proposal:

William J.T. Boyd, President
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Scott Bottomley, Vice President/Assistant Secretary
Christopher Winter, CFO/Treasurer/Vice President/Assistant Secretary Jeff Galterio, Assistant Secretary
The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal, or any firm, corporation, partnership or joint venture of which any principal having an interest in this proposal was an owner, corporate officer, partner or joint venture are as follows None
All current and prior DBAs, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows:

None
of all aforementioned principals this day ofFeb. 2023
Uffaltens
BIDDER:

Signature
Jeff Galterio, Assistant Secretary
Name and Title of Signatory
Sully-Miller Contracting Company
Legal Name of Bidder
135 S. State College Blvd., Ste. 400, Brea, CA 92821
Address
714/578-9600 33-0787630
Telephone Number Federal Tax I.D. No.

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 scararaconasaracacasacasara rosadoracasasacasa as a acacacacocacasa ca casadora cocoa a aaaas A notary public or other officer completing this certificate verifies only the identity of the individual who signed th locument to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document State of California )
County of Orange
On March 4, 2023 before me, _ J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal:

J. DANIELS
Notary Public - California
Orange County
Commission # 2377975 Signature
My Comm. Expires Oct 9, 2025 gnature of Notary
J. Daniels, Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Do Bidder's Information & Certification Document Date: February 23, 2023 Title or Type of Document:

Number of Pages: 1 Signers) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:
* Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited O General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: Signer Is Representing:

Sully-Miller Contracting Company
xen q0qn00000cccccccc0cc00000 0000000000 000000000000x
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 /m
SULLY-MILLER CONTRACTING CO.

License 747612A
135 S. State College Blvdl., STE. 400 • Brea, CA 92821 • PHONE 714-578-9600 License Certificate
I certify under penalty of perjury under the laws of the State of California that the following is true and correct:

CSLB: Sult altis
747612-A Jeff Galterio, Assistant Secretary
dca CONTRACTORS

STATE LICENSE BOARD

DEPARTMENT CY CONSUMER AFFAIRS ACTIVE LICENSE
License Number 747612 Entity CORP
Business Name SULLY - MILLER CONTRACTING

COMPANY
•
Classifications) A CSLB
-
Expiration Date 03/31/2024 www.csib.ca.gov
DIR • State of California
Department of
EST. 1927 Industrial Relations
Contractor Information
Legal Entity Name

SULLY-MILLER CONTRACTING COMPANY
Legal Entity Type
Corporation
Status
Active
Registration Number
1000003664
Registration effective date
7/1/2022
Registration expiration date
6/30/2024
Mailing Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Physical Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Email Address
[email protected]
Trade Name/DBA
License Number (s)
CSLB -747612

CERTIFICATE OF INCUMBENCY AND RESOLUTION
I, Anthony L. Martino, II, do hereby certify that I am the Secretary of Sully-Miller Contracting Company, a Delaware corporation, and that as such I have access to and custody of the corporate records and minute books of said corporation.

And I do hereby further certify that the following persons are duly elected officers of said corporation.

TITLE NAME
Chairman Of The Board Marcus Leavitt
President William Joseph Thomas Boyd
Vice President, CFO, Treasurer Christopher Winter
and Assistant Secretary
Vice President and Assistant Secretary Scott Bottomley
Secretary Anthony L. Martino, I
Assistant Secretary Jeff Galterio
Assistant Secretary Mark Pachura
I further certify that the following is a true and correct copy of a resolution duly adopted by the Board of Directors of said Company at a meeting held on December 15, 2022, and that this resolution has not been in any way rescinded, annulled, or revoked but the same is still in full force and effect:

BID TENDERS: GENERAL
RESOLVED, that any officer of the Corporation be and they hereby are authorized in the name and on behalf of the Corporation, under its corporate seal or otherwise (i) to prepare proposals and bids for the supplying of construction materials and the performance by itself or in joint venture, of work of whatsoever nature in connection with the construction or paving of highways, roads and airports and in connection with earthworks and civil engineering projects of all kinds, together with all work incidental thereto, (ii) to execute and submit any and all such proposals and bids to any governmental authority, instrumentality, or agency of the United States, its several states, territories and possessions, including without limitation, any municipality or other political or corporate subdivision thereof, and to any corporation, partnership, sole proprietorship, or other business entity, (ili) in connection with any such submission, to deliver bid deposits or bonds as may be required and (iv) to execute and deliver definitive agreements binding the Corporation to perform work in accordance with any proposals and bids authorized hereby.

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal this 28th day of February 2023.
any Manoe 2001
(SEAL)
Secretary
Sully-Miller Contracting Company
135 S. State College Blvd., Ste. 400
Brea, CA 92821
DocuSign Envelope ID: E93D81F8-0029-4AB9-83E0-B2ADB942F2B8

BIDDER'S QUESTIONNAIRE
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California

1. Submitted by: Sully-Miller Contracting Telephone: 714/578-9600 Principal fice Adresp any 135 S. State College Bvd.. Ste. 400. Brea, CA 92821

2. Type of Firm:
* c Corporation
S Corporation
Individual/Sole Proprietor or Single -Member LLC
Partnership
• Limited Liability Company "C" C-Corp
Limited Liability Company "S" S-Corp
• Limited Liability Company "p" Partnership
• Other
3a. If a corporation, answer these questions:

Date of Incorporation: 06/16/1997 State of Incorporation: Delaware President's Name: William J.T. Boyd
Vice-President's Name: Scott Bottomley & Christopher Winter Secretary or Clerk's Name: Anthony L. Martino, I!
Treasurer's Name: Christopher Winter
3b. If a partnership, answer these questions:

Date of organization: _State Organized in:

Name of all partners holding more than a 10% interest:

Designate which are General or Managing Partners.

CERTIFICATE OF INCUMBENCY AND RESOLUTION
I, Anthony L. Martino, II, do hereby certify that I am the Secretary of Sully-Miller Contracting Company, a Delaware corporation, and that as such I have access to and custody of the corporate records and minute books of said corporation.

And I do hereby further certify that the following persons are duly elected officers of said corporation.

TITLE NAME
Chairman Of The Board Marcus Leavitt
President William Joseph Thomas Boyd
Vice President, CFO, Treasurer Christopher Winter
and Assistant Secretary
Vice President and Assistant Secretary Scott Bottomley
Secretary Anthony L. Martino, II
Assistant Secretary Jeff Galterio
Assistant Secretary Mark Pachura
I further certify that the following is a true and correct copy of a resolution duly adopted by the Board of Directors of said Company at a meeting held on December 15, 2022, and that this resolution has not been in any way rescinded, annulled, or revoked but the same is still in full force and effect:

BID TENDERS: GENERAL
RESOLVED, that any officer of the Corporation be and they hereby are authorized in the name and on behalf of the Corporation, under its corporate seal or otherwise (i) to prepare proposals and bids for the supplying of construction materials and the performance by itself or in joint venture, of work of whatsoever nature in connection with the construction or paving of highways, roads and airports and in connection with earthworks and civil engineering projects of all kinds, together with all work incidental thereto, (ii) to execute and submit any and all such proposals and bids to any governmental authority, instrumentality, or agency of the United States, its several states, territories and possessions, including without limitation, any municipality or other political or corporate subdivision thereof, and to any corporation, partnership, sole proprietorship, or other business entity, (ill) in required and (iv) to execute and deliver definitive agreements binding the Corporation to perform work in accordance with any proposals and bids authorized hereby.

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal this 28th day of February 2023.
20001
(SEAL) Anthony L. Martino, II
Secretary
Sully-Miller Contracting Company
135 S. State College Blvd., Ste. 400
Brea, CA 92821
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 BIDDER'S QUESTIONNAIRE (cont'a)
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California

4. Name of person holding CONTRACTOR's license: William J.T. Boyd, President License number: 714612 Class: A Expiration Date: March 31, 2024 D.I.R. Registration # 1000003664

5. CONTRACTOR's Representative: Anthony Lino
Title: Pre-Construction Manager
Alternate: Jeff Galterio
Title: Assistant Secretary

6. List the major construction projects your organization has in progress as of this date:

A.

Owner: **Please See Attached List of Project References** Project Location:

Type of Project:

B.

Owner:_
Project Location:

Type of Project:

Owner:

Project Location:

Type of Project: _
SULLY-MILLER CONTRACTING CO.

License 747612A
135 S. State College Blvdl., STE. 400 • Brea, CA 92821 • PHONE 714-578-9600 License Certificate
I certify under penalty of perjury under the laws of the State of California that the following is true and correct:

CSLB: Uf alters
747612-A Jeff Galterio, Assistant Secretary
dca CONTRACTORS

STATE LICENSE BOARD

DEPARTMENT CE CONSUMER AFFAIRS ACTIVE LICENSE
License Number 747612 Entty CORP
Business Name SULLY - MILLER CONTRACTING

COMPANY
Classification(s) A CSLB
Expiration Date 03/31/2024 www.csib.ca.gov
DIR • State of California
Department of
EST. 1927 Industrial Relations
Contractor Information
Legal Entity Name

SULLY-MILLER CONTRACTING COMPANY
Legal Entity Type
Corporation
Status
Active
Registration Number
1000003664
Registration effective date
7/1/2022
Registration expiration date
6/30/2024
Mailing Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Physical Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Email Address
[email protected]
Trade Name/DBA
License Number (s)
CSLB -747612
Project
Experience

SULLY-MILLER
CONTRACTING Co.

A COLAS COMPANY
NOVEMBER 19
Sully-Miller Contracting Co.
135 S. State College Blvd., Suite 400
Brea, CA 92821

SULLY- MILLER
CONTRACTING Co. Project Experience

TACOLAS COMPANY
Construction on State Highway Route 15 from Oak
Project Full Name > Route 210 ADA Curb Ramp Upgrade Project Hill Rd. to Bear Valley Rd.

LA County from the Sunland Blvd. crossing
Project Location San Bernardino County CA (Tujunga CA) to Baseline Rd. crossing (Upland CA)
Project Owner CALTRANS CALTRANS
Contact Name John Santos John Santos
Contact Role/
Project Manager Project Manager
Position
Telephone (951) 538 - 5315 (951) 538 - 5315
Email [email protected] [email protected]
Reaching a project boundary length of almost ten
This 23-million-dollar project wasn't just a "run of
miles, the amount of unique worked that is
required by this project is on an immense scale. the mill" construction project, this project was a The scope of work consists of scheduling; design-build project that required all of the curb mobilization and demobilization; traffic control; ramps on the on/off ramps and frontage roads along the 210 freeway to be reconstructed to
temporary barricade
comply with current ADA standard codes. The
temporary and permanent striping/marking;
temporary crash cushion installation; landscaping project limits extended a total of approximately 41 that included clear and grubbing, roadside miles that begun 1.4 miles west of the Sunland clearing and over two million square feet of Boulevard undercrossing and ended just 0. 1 miles Facility Information Project
Description east of the Baseline Road undercrossing. The hydroseeding; over 110,000 cubic yards of
aggregate base placement; cold milling; HMA projects scope of work consisted of upgrading 264 ADA curb ramps, installation of accessible
application; concrete work which included
and pedestrian signal systems, and the installation of
flatwork, curb and gutters, sidewalks;
striping/marking; electrical work that involved pedestrian countdown timers. This project, due to signal construction, ramp metering construction, its vast length along the 41 mile stretch of the 210 and lighting system installation; as well as a freeway, creates unique challenges that are considerable amount of underground work such currently being overcome by the Sully-Miller team's resilience and desire to challenge the
as pipe culvert construction, pipe and down drain
construction, and pipe liner application. ordinary.

Start Date November 2021 January 2022
Project Duration
End Date Est. December 2024 Est. January 2024
Cost Contract Amount $ 121,672,000 $ 23,680,000
Sully-Miller Contracting Company | 135 SState College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY -MILLER
CONTRACTING Co Project Experience

A COLAS COMPANY
applia selley Parkway
5-22419 104347
2020 Pavement Overlay and Resurfacing Spring Valley Lake ADA Ramps and Various Roads Project Full Name >
Program Overlay Project
Project
Location Thousand Oaks, CA Spring Valley Lake, CA
Project Owner City of Thousand Oaks County of San Bernardino Contact Name Michelle McCarty Joseph Schweitzer
Contact Role/
Position Project Manager Supervising Engineer
Telephone (805) 449 - 2477 (909) 387 - 7936
Email [email protected] [email protected] This almost $13 million dollar job was for
Thousand Oaks' annual pavement rehabilitation
program. This project's boundaries covered an The Spring Valley Lake project was a vast-scale extremely large area, just over 63 square miles, project that required the cold milling and re-paving which presented a unique challenge for overall of over 120 separate locations within a 2.25 construction planning. The scope of work for this square mile project boundary. The project's scope project covered a majority of cold milling and hot of work included minor concrete work (such as Facility Information Project mix asphalt and rubberized hot mix asphalt Description ADA curb ramp, curb and gutter, spandrel,
paving, but also included an enormous amount of driveway and retaining curb construction), cold full section removal and replace (almost 142,000 milling (over 2,000,000 square feet worth), square feet), the removal and replacement of over grading, placing asphalt concrete (including 200 curb ramps, over 8,000,000 square feet of asphalt rubberized hot mix), utility adjustment and crack seal application, a large quantity of striping/marking work. microsurfacing/slurry seal, utility adjusting,
striping/marking and some.

Start Date May 2020 September 2019
Project Duration
End Date December 2020 April 2020
Cost Contract Amount $ 12,995,708 $ 12,448,000
Sully-Miller Contracting Company | 135 SState College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com LLL

SULLY - MILLER
CONTRACTING Co.

Project Experience

A COLAS COMPAST
LA County Sheriff's Department Emergency Annual Residential Street Rehabilitation Project Project Full Name > Phase 2A
Vehicle Operations Center
Project
Location Castaic, CA Compton, CA
Project Owner Los Angeles County Department of Public Works City of Compton Contact Name Victorio Monteil John Strickland
Contact Role/
Position Project Manager Project Manager
Telephone (626) 300 - 3267 (310) 605 - 5505
Email [email protected] [email protected] This project consists of the design and
construction of a Sheriff's Department Emergency
Vehicle Operation Center (EVOC) which will be
used to train Sheriff's personnel on safe operation
of vehicles operated at high speed and on normal
Stretching over seven miles in three separate
city streets. It includes a 5,000 square foot
locations, the second phase of Compton's
classroom building with offices, locker rooms,
storage, a kitchenette, and restroom facilities, a 44
acre high-speed track, with pursuit track area, a work for this job encompassed cold milling and Facility Information Project skid pan for training personnel on how to operate Description vehicles in slippery road conditions and a collision pavement overlay, base application, full depth reconstruction, concrete construction (curb and
avoidance track to practice avoiding other vehicle
or objects in emergency situations. There is also gutter, sidewalks, driveways, cross gutters, alley intersections, and curb ramps), pavement
a training vehicle parking lot, as well as a separate
employee and class attendee parking lot. The striping/marking, utility adjusting and traffic loop installation.
itemized scope of work includes the design and
construction of grading, base and asphalt
concrete construction, civil construction work,
structural work, electrical, underground fire/water
system construction, demolition and landscaping.

Start Date March 2020 October 2021
Project Duration
End Date February 2022 Est. July 2022
Cost Contract Amount $ 10,790,000 $ 6,465,000
Sully-Miller Contracting Company | 135 SState College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com / m

SULLY -MILLER
CONTRACTING Co.

Project Experience

TACOLAS CORTANT
Project Full Name > 2020 Spring Pavement Management Program 2018-19 Overlay Project A Project Location Lancaster, CA Santa Clarita, CA
Project Owner City of Lancaster City of Santa Clarita
Contact Name Vickie Zhao Julia Regan
Contact Role/
Position Assistant Engineer Project Manager
Telephone (661) 945 - 6869 (661) 255 - 4301
Email [email protected] [email protected] Totaling to a distance of over four miles, this
project not only included the rehabilitation of
almost a one-mile portion of two-lane arterials, but
With a proposal plan of a base bid and seven
also encompassed the reconstruction of over three
alternates, the shear breadth of the Santa Clarita
miles of 10th Street West in Lancaster CA, which is
annual overlay project had its initial challenging
one of Lancaster's largest arterial roadways.

Sitting at six lanes wide, the reconstruction called elements. Not only did the scope of work include Facility Information Project for a mass amount of hot mix asphalt concrete, general key-cut grinding, cold planning and overlay Description of various hot mix asphalts, but there was also a over 12,000 tons, and asphalt rubber hot mix significant amount of full depth removal and concrete, over 13,000 tons. However, this project replace, as well as utility adjusting, traffic loop did not only include the planning and paving of
asphalt, the scope of work also included curb ramp installation, striping/marking and some minor concrete work.
reconstruction, minor electrical work, slurry seal
application, aggregate base application, and
signing, striping, and marking.

Start Date September 2020 July 2019
Project Duration
End Date December 2020 December 2019
Cost Contract Amount $ 6,252,000 $ 4,480,399
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com LL

SULLY- MILLER
SONTRACTING CO Project Experience

A COLAS CURPATT
Project Full Name > Pavement Rehabilitation at Various Locations - Greenstone Avenue Street Improvements Street, Water, and Sewer Improvements
Project
Location Lynwood, CA Santa Fe Springs, CA
Project Owner City of Lynwood City of Santa Fe Springs
Contact Name Noe Martinez Robert Garcia
Contact Role/
Public Works Assistant Associate Civil Engineer
Position
Telephone (310) 603 - 0220 (562) 868 - 0511
Email [email protected] [email protected] At just over a mile long and exiting in a location
With a job location spanning over five square miles within a heavy industry district in Santa Fe Springs, Greenstone Avenue needed an overhaul to say
in six different unique locations, this project proved
the least. The full scope of work included with this
to have challenging aspects not only from its
location, but also with its broad scope of work. This project was cold milling of asphalt concrete, job included level work such as street resurfacing, applying a new layer of asphalt rubber hot mix various types of concrete work, traffic signing and asphalt, application of roller compacted concrete, Facility Information Project utility adjustment, signing, striping and the Description striping; as well as underground work at the various locations, which incorporated sanitary construction of PCC curb and gutters, curb ramps, driveways, cross gutters and sidewalks. The city of
sewer system repairs (with CIPP lining), new
Santa Fe Springs provided an offsite (yet close to
water mainline installation including the service the jobsite) lot that contained a mobile asphalt laterals, smart metes, fire hydrants plant to induct and mix the materials needed for appurtenances.
the roller compacted concrete, which was then
transported to the job site.

Start Date October 2020 June 2019
Project Duration
End Date February 2021 January 2020
Cost Contract Amount $ 3,468,000 $ 3,444,361
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com LYL

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
710K
Project Full Name > Prairie Avenue Improvements Sherman Way Streetscape Improvements Project Location Inglewood, CA Reseda, CA
Project Owner City of Inglewood City of Los Angeles
Contact Name Hunter Nguyen Courtney Luc
Contact Role/
Position Associate Engineer Project Manager
Telephone (310) 412 - 5333 (213) 847 - 2354
Email [email protected] [email protected] Located directly off of Prairie Avenue sits the At just under a mile, this four lane arterial required Forum, an iconic entertainment venue, and the (at more than just a standard grind and overlay. On the time currently under construction Sofi top of the cold planning, hot mix asphalt Stadium. Both of which bring heavy traffic to this placement, base application and minor concrete two mile stretch of a six lane arterial. The scope of work, this job's scope of work also included, traffic Facility Information Project work for this improvement project included signal construction/relocation, minor electrical Description surveying, traffic control, over 500,000 square feet work, utility adjustment and a large amount of of cold planning, construction of hot mix asphalt beautification work. The beautification work and asphalt rubber hot mix, placement of base encompassed the construction of tree wells, tree material, almost 1000 cubic yards worth of planting, mulch placement, top soil furnishing, concrete improvements, utility adjustment, almost 10,000 square feet of landscaping and the signing, striping, and traffic loop restoration. application of cobblestone.

Start Date February 2020 April 2020
Project Duration
End Date July 2020 May 2021
Cost Contract Amount $ 3,258,000 $ 2,623,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY- MILLER
CONTRACTING Co.

Project Experience

A COLAS COMPANY
МОЛИНИИ

WELCOME

OLD TOWN
1570

MASA TON TO
Project Full Name > Pedestrian Path Improvements at Various Locations in Boron and Desert Lake 2021 Arterial Street Overlay Project
Location Boron, CA Palmdale, CA
Project Owner County of Kern City of Palmdale
Contact Name Michelle Burns-Lusich Marc Zuber
Contact Role/
Public Works Manager Public Works Project Manager
Position
Telephone (661) 882 - 8861 (661) 267 - 5300
Email [email protected] [email protected] To preserve the historical significance of the
Twenty Mule Team Road, where a majority of the
work for this project had been done, constructing
and/or reconstructing the pedestrian pathways This project called for a mass amount of pavement and the asphalt of the road itself was completed to be cold planed and repaved, over one million Facility Information Project
Description
road, consisting of over 1000 cubic yards of
Portland cement concrete and over 5000 tons of
asphalt cement. The complete scope of work for work.
this project included constructing Class 1 bike
paths, multi-use paths, sidewalks, curbs, gutters,
curb ramps, drive approaches and paving hot mix
asphalt concrete.

Start Date May 2020 July 2021
Project Duration
End Date November 2020 August 2021
Cost Contract Amount $ 2,536,331 $ 2,067,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

CERTIFICATION OF NON-SEGREGATED FACILITIES
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
The BIDDER certifies that it does not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The BIDDER certifies further that it will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it will not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The BIDDER agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, rest rooms, and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. The BIDDER agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) it will obtain identical certifications from the provisions of the Equal Opportunity clause, and that it will retain such certifications in its files.

CLalters
Sully-Miller Contracting Company
BIDDER Jelt Galterio, Assistant Secretary
Required by the May 19, 1967 order on Elimination of Segregated Facilities, by the Secretary of Labor - 32 F.R. 7439, May 19, 1967 (F.R. Vol. 33, No. 33 - Friday, February 16, 1968 - p. 3065).

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

DESIGNATION OF SUBCONTRACTORS
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
Subcontractor DIR Registration No.* Dollar Value of Work PC\ 1000813536 272, 440
Age of firm: Annual Gross Receipts:

DBE: Yes NO
15 + Tears Certifying Agency: / $5,000,000 +
Location and Place of Business
975 w. 155 st AZUSA, CA, 91702
Bid Schedule Item No's: Description of Work
1S-31 BASE BID
stripins
License No. Exp. Date: Phone ( )
415490 562) 218-0508
Subcontractor DIR Registration No.* Dollar Value of Work Ст! 1000008423 050,000
Age of firm: Annual Gross Recepts:

DBE: (Yes
15 Years Certifying Agency: 40085 410,000, 000 t
Location and Place of Business
Bi schedule lem Nos Mounterin Ave, la Mabra, dA 90631 625 Description of Work
VARIOUS support
sweeling
License No. Exp. Date: Phone ( )
754500 562) 627-2286
Subcontractor DIR Registration No.* Dollar Value of Work traffic loops Crackfilling 1000003794 - 204,17508
Age of firm: DBE: Yes Annual Gross Receipts:
+ Teas. Certifying Agency: 38033 185,000,000 +
ocation and Place of Busines
94 10 St Ancheim, CA, 9 2804
ALT 1 Bld Schedule tem No's Ener
Description of Work
24,33 32-38 BASE BID VDS LOOPS
License No. Exp. Date: Phone ( )
кт г 652986

23.24 7141520-4024
NOTE: A BIDDER or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered BIDDER to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the BIDDER is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. *Pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

DESIGNATION OF SUBCONTRACTORS
Bid # CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
sted below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perform work or labor or rend re i exces or an a paris paro pating a sE. no subcontractors wilhe used flour the form with A. Ad adar, sheat needed gross recalf Subcontractor DIR Registration No.* Dollar Value of Work EBS 1000004286 $ 34,000
Age of firm: DBE: Yes (NO Annual Gross Receipts:
20 Certifying Agency: Snil - N0 ~1
Location and Place of Business
Coronas CA 1345 Quarry St. * 101
Bid Schedule Item No's: Description of Work
13-14,50-51,72-73 Adjusting Utilities
License No. Exp. Date: 5/31/2023 Phone ( )
932798 951-279-6869
Subcontractor DIR Registration No.* Dollar Value of Work Pavement Reykliny Systuns 1000003363 $ 271, 700 d
Age of firm: DBE: Yes No Annual Gross Receipts:
20 Certifying Agency: 1S mil +
Location and Place of Business
| 0240 Seeine Way, Jumps Valley, CA 91752
Bid Schedule Item No's: Description of Work
1-9, "-R millig AC
License No. Exp. Date: / / Phone (
569352 951-682-1091
Subcontractor DIR Registration No.* Dollar Value of Work 20 DC Traffic Control 1000039211 $52,000
Age of firm: DBE: (YeS) Annual Gross Receipts:

No
5+ years Certifying Agency: $5.000,000
Location and Place of Business
12905 Artesia Blvd , cerritos, CA, 90703
Bid Schedule Item No's: Description of Work
2,37,62 Traffic (ontrol (partial)
License No. Exp. Date: Phone ( )
1015478
NOTE: A BIDDER or subcontractor shall not be quallfied to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered BIDDER t ubmit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the BIDDER is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. *Pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the Califarnia Labor Code. :

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F288

REFERENCES
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
The following are the names, addresses, and telephone numbers of three public agencies for which bidder has performed and completed work of a similar scope and size within the past 3 years. If the scope of work/specifications requests references different than instructions above, the scope of work/specifications

1. **Please See Attached List of Project References**
Name and Address of Owner / Agency
Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed

2. Name and Address of Owner / Agency
Name and Telephone Number of Person Famillar with Project Contract Amount Type of Work Date Completed

3. Name and Address of Owner / Agency
Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom bidder intends to procure insurance bonds: _* **Please See Attached List of Sureties** Project
Experience
/m

SULLY -MILLER
CONTRACTING Co.

A COLAS COMPANY
LONELY:

NOVEMBER 19
Sully-Miller Contracting Co.
135 S. State College Blvd., Suite 400
Brea, CA 92821
m

SULLY - MILLER
CONTRACTING Co. Project Experience

A COLAS CURTANT
Construction on State Highway Route 15 from Oak Route 210 ADA Curb Ramp Upgrade Project Project Full Name > Hill Rd. to Bear Valley Rd.

LA County from the Sunland Blvd. crossing
Project Location San Bernardino County CA (Tujunga CA) to Baseline Rd. crossing (Upland CA)
Project Owner CALTRANS CALTRANS
Contact Name John Santos John Santos
Contact Role/
Position Project Manager Project Manager
Telephone (951) 538 - 5315 (951) 538 - 5315
Email [email protected] [email protected]
Reaching a project boundary length of almost ten This 23-million-dollar project wasn't just a "run of miles, the amount of unique worked that is
the mill" construction project, this project was a
required by this project is on an immense scale
design-build project that required all of the curb
ramps on the on/off ramps and frontage roads
• Bantate and toning bacon! along the 210 freeway to be reconstructed to comply with current ADA standard codes. The
temporary and permanent striping/marking; project limits extended a total of approximately 41 temporary crash cushion installation; landscaping miles that begun 1.4 miles west of the Sunland that included clear and grubbing, roadside
Boulevard undercrossing and ended just 0.1 miles
Facility Information Project clearing and over two million square feet of east of the Baseline Road undercrossing. The Description hydroseeding; over 110,000 cubic yards of
projects scope of work consisted of upgrading 264
aggregate base placement; cold milling; HMA ADA curb ramps, installation of accessible application; concrete work which included
pedestrian signal systems, and the installation of
flatwork, curb and gutters, and sidewalks;
striping/marking; electrical work that involved pedestrian countdown timers. This project, due to its vast length along the 41 mile stretch of the 210
signal construction, ramp metering construction,
freeway, creates unique challenges that are
and lighting system installation; as well as a
currently being overcome by the Sully-Miller
considerable amount of underground work such
team's resilience and desire to challenge the
as pipe culvert construction, pipe and down drain
ordinary.
construction, and pipe liner application.

Start Date November 2021 January 2022
Project Duration
End Date Est. December 2024 Est. January 2024
Cost Contract Amount $ 121,672,000 $ 23,680,000
Sully-Miller Contracting Company | 135S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY- MILLER
CONTRACTING Co Project Experience

A COLAS COMPANY
Shawalley Parkwa
28-1201: 70:43:47
2020 Pavement Overlay and Resurfacing Spring Valley Lake ADA Ramps and Various Roads Project Full Name >
Program Overlay Project
Project
Location Thousand Oaks, CA Spring Valley Lake, CA
Project Owner City of Thousand Oaks County of San Bernardino Contact Name Michelle McCarty Joseph Schweitzer
Contact Role/
Position Project Manager Supervising Engineer
Telephone (805) 449 - 2477 (909) 387 - 7936
Email [email protected] [email protected] This almost $13 million dollar job was for
Thousand Oaks' annual pavement rehabilitation
program. This project's boundaries covered an The Spring Valley Lake project was a vast-scale extremely large area, just over 63 square miles, project that required the cold milling and re-paving which presented a unique challenge for overall of over 120 separate locations within a 2.25 construction planning. The scope of work for this square mile project boundary. The project's scope project covered a majority of cold milling and hot of work included minor concrete work (such as Facility Information Project mix asphalt and rubberized hot mix asphalt Description ADA curb ramp, curb and gutter, spandrel,
paving, but also included an enormous amount of driveway and retaining curb construction), cold full section removal and replace (almost 142,000 milling (over 2,000,000 square feet worth), square feet), the removal and replacement of over grading, placing asphalt concrete (including 200 curb ramps, over 8,000,000 square feet of asphalt rubberized hot mix), utility adjustment and crack seal application, a large quantity of striping/marking work. microsurfacing/slurry seal, utility adjusting,
striping/marking and some.

Start Date May 2020 September 2019
Project Duration
End Date December 2020 April 2020
Cost Contract Amount $ 12,995,708 $ 12,448,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY- MILLER

CONTRACTING CO
Project Experience

A COLAS CONNY
LA County Sheriff's Department Emergency Annual Residential Street Rehabilitation Project Project Full Name > Phase 2A
Vehicle Operations Center
Project
Location Castaic, CA Compton, CA
Project Owner Los Angeles County Department of Public Works City of Compton Contact Name Victorio Monteil John Strickland
Contact Role/
Position Project Manager Project Manager
Telephone (626) 300 - 3267 (310) 605 - 5505
Email [email protected] [email protected] This project consists of the design and
construction of a Sheriff's Department Emergency
Vehicle Operation Center (EVOC) which will be
used to train Sheriff's personnel on safe operation
of vehicles operated at high speed and on normal
city streets. It includes a 5,000 square foot Stretching over seven miles in three separate locations, the second phase of Compton's
classroom building with offices, locker rooms,
reconstruction project was completed with a heavy
storage, a kitchenette, and restroom facilities, a 44 amount of materials and man-power. The scope of acre high-speed track, with pursuit track area, a work for this job encompassed cold milling and Facility Information Project skid pan for training personnel on how to operate Description vehicles in slippery road conditions and a collision pavement overlay, base application, full depth reconstruction, concrete construction (curb and
avoidance track to practice avoiding other vehicle
or objects in emergency situations. There is also gutter, sidewalks, driveways, cross gutters, alley intersections, and curb ramps), pavement
a training vehicle parking lot, as well as a separate
employee and class attendee parking lot. The striping/marking, utility adjusting and traffic loop itemized scope of work includes the design and installation. construction of grading, base and asphalt
concrete construction, civil construction work,
structural work, electrical, underground fire/water
system construction, demolition and landscaping.

Start Date March 2020 October 2021
Project Duration
End Date February 2022 Est. July 2022
Cost Contract Amount $ 10,790,000 $ 6,465,000
Sully-Miller Contracting Company | 135 SState College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY - MILLER
CONTRACTING Co.

Project Experience

TA COLAS CORPANT
Project Full Name > 2020 Spring Pavement Management Program 2018-19 Overlay Project A Project Location Lancaster, CA Santa Clarita, CA
Project Owner City of Lancaster City of Santa Clarita
Contact Name Vickie Zhao Julia Regan
Contact Role/
Position Assistant Engineer Project Manager
Telephone (661) 945 - 6869 (661) 255 - 4301
Email [email protected] [email protected] Totaling to a distance of over four miles, this
project not only included the rehabilitation of
almost a one-mile portion of two-lane arterials, but
With a proposal plan of a base bid and seven
also encompassed the reconstruction of over three
alternates, the shear breadth of the Santa Clarita
miles of 10th Street West in Lancaster CA, which is annual overlay project had its initial challenging one of Lancaster's largest arterial roadways.

Sitting at six lanes wide, the reconstruction called elements. Not only did the scope of work include Facility Information Project for a mass amount of hot mix asphalt concrete, general key-cut grinding, cold planning and overlay Description of various hot mix asphalts, but there was also a over 12,000 tons, and asphalt rubber hot mix significant amount of full depth removal and concrete, over 13,000 tons. However, this project
did not only include the planning and paving of replace, as well as utility adjusting, traffic loop asphalt, the scope of work also included curb ramp installation, striping/marking and some minor concrete work.
reconstruction, minor electrical work, slurry seal
application, aggregate base application, and
signing, striping, and marking.

Start Date September 2020 July 2019
Project Duration
End Date December 2020 December 2019
Cost Contract Amount $ 6,252,000 $ 4,480,399
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY-MILLER
CONTRACTING Co. Project Experience

ACOLAS CUMPANT
Project Full Name > Pavement Rehabilitation at Various Locations - Greenstone Avenue Street Improvements Street, Water, and Sewer Improvements
Project Santa Fe Springs, CA
Location Lynwood, CA
Project Owner City of Lynwood City of Santa Fe Springs
Contact Name Noe Martinez Robert Garcia
Contact Role/
Public Works Assistant Associate Civil Engineer
Position
Telephone (310) 603 - 0220 (562) 868 - 0511
Email [email protected] [email protected] At just over a mile long and exiting in a location
With a job location spanning over five square miles within a heavy industry district in Santa Fe Springs, Greenstone Avenue needed an overhaul to say
in six different unique locations, this project proved
the least. The full scope of work included with this
to have challenging aspects not only from its
location, but also with its broad scope of work. This project was cold milling of asphalt concrete, applying a new layer of asphalt rubber hot mix
job included level work such as street resurfacing, asphalt, application of roller compacted concrete, Facility Information Project various types of concrete work, traffic signing and Description utility adjustment, signing, striping and the striping; as well as underground work at the
various locations, which incorporated sanitary construction of PCC curb and gutters, curb ramps, sewer system repairs (with CIPP lining), new driveways, cross gutters and sidewalks. The city of water mainline installation including the service Santa Fe Springs provided an offsite (yet close to metes, the jobsite) lot that contained a mobile asphalt laterals, smart fire hydrants
plant to induct and mix the materials needed for
appurtenances. the roller compacted concrete, which was then transported to the job site.

Start Date October 2020 June 2019
Project Duration
End Date February 2021 January 2020
Cost Contract Amount $ 3,468,000 $ 3,444,361
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY -MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
710K
Project Full Name > Prairie Avenue Improvements Sherman Way Streetscape Improvements Project Location Inglewood, CA Reseda, CA
Project Owner City of Inglewood City of Los Angeles
Contact Name Hunter Nguyen Courtney Luc
Contact Role/
Position Associate Engineer Project Manager
Telephone (310) 412 - 5333 (213) 847 - 2354
Email [email protected] [email protected] Located directly off of Prairie Avenue sits the At just under a mile, this four lane arterial required Forum, an iconic entertainment venue, and the (at more than just a standard grind and overlay. On the time) currently under construction Sofi top of the cold planning, hot mix asphalt Stadium. Both of which bring heavy traffic to this placement, base application and minor concrete two mile stretch of a six lane arterial. The scope of work, this job's scope of work also included, traffic Project work for this improvement project included signal construction/relocation, minor electrical Description surveying, traffic control, over 500,000 square feet work, utility adjustment and a large amount of of cold planning, construction of hot mix asphalt beautification work. The beautification work and asphalt rubber hot mix, placement of base encompassed the construction of tree wells, tree material, almost 1000 cubic yards worth planting, mulch placement, top soil furnishing, concrete improvements, utility adjustment, almost 10,000 square feet of landscaping and the signing, striping, and traffic loop restoration. application of cobblestone.

Start Date February 2020 April 2020
Project Duration
End Date July 2020 May 2021
Cost Contract Amount $ 3,258,000 $ 2,623,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY-MILLER
CONTRACTING Ca
Project Experience

OLD TOWN
BARON
Pedestrian Path Improvements at Various
Project Full Name > Locations in Boron and Desert Lake 2021 Arterial Street Overlay Project
Location Boron, CA Palmdale, CA
Project Owner County of Kern City of Palmdale
Contact Name Michelle Burns-Lusich Marc Zuber
Contact Role/
Public Works Manager Public Works Project Manager
Position
Telephone (661) 882 - 8861 (661) 267 - 5300
Email [email protected] [email protected] To preserve the historical significance of the
Twenty Mule Team Road, where a majority of the
work for this project had been done, constructing
and/or reconstructing the pedestrian pathways
and the asphalt of the road itself was completed to be cold planed and repaved, over one million with much care and respect. Adding up to almost
four miles in distance, the job itself had notable square feet, and required a polymer modified Facility Information Project concrete and asphalt quantities for a two-lane Description
road, consisting of over 1000 cubic yards of
Portland cement concrete and over 5000 tons of also included surveying, striping, marking, utility asphalt cement. The complete scope of work for work.
this project included constructing Class 1 bike
paths, multi-use paths, sidewalks, curbs, gutters,
curb ramps, drive approaches and paving hot mix
asphalt concrete.

Start Date May 2020 July 2021
Project Duration
End Date November 2020 August 2021
Cost Contract Amount $ 2,536,331 $ 2,067,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com SULLY-MILLER CONTRACTING CO.

License 747612A
135 S. State College Bivdl., STE. 400 • Brea, CA 92821 • PHONE 714-578-9600 The Following are the names, addresses, and telephone numbers for all brokers and sureties from whom Bidder intends to procure insurance and bonds:

Agent for Surety:

Willis Towers Watson Insurance Services West, Inc.
2010 Main Street, Suite 1050
Irvine, CA 92614
Phone 949/885-1206
FAX 949/885-1225
Contact: Victoria Campbell
Surety :

Liberty Mutual Insurance Co.
8044 Montgomery Road Suite #137
Cincinnati, OH 45236
Phone 513/984-2222 X 321
FAX 513/984-3165
Contact: Kelley Brown
Surety:

Berkshire Hathaway Specialty Insurance
1314 Douglas Street
Omaha, NE 68102
Phone 770/625-2509
Contact: D.J. Conroy
Insurance:

Liberty Mutual Group
1133 Avenue of America
New York, NY 10036
Phone 800/227-9887 Ext 443
FAX 212/391-1954
Insurance:

Marsh USA
445 South Street Suite 210
Morristown, NJ 07962
Phone 973/401-5151
FAX 973/401-5045
Contact: Anton Schmitt
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

DEBARMENT AND SUSPENSION CERTIFICATION
TITLE 49, CODE OF FEDERAL REGULATIONS, PART 29
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
: City of Santa Clarita, California
The bidder under penalty of perjury, certified that except as noted below, he/she or any person associated therewith in the capacity of owner, partner, director, office manager:
is not currently under suspension, debarment, voluntary exclusion or determination of ineligibility by any federal AGENCY;
has not been suspended, debarred, voluntarily excluded, or determined ineligible by any federal AGENCY within past three years;
does not have a proposed debarment pending; and
has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 10 years.

If there are any exceptions to this certification, insert the exceptions in the following space.

None
Exceptions will not necessarily result in denial of award but will be considered in determining bidders' responsibillty. For any exception noted above, indicate below to whom it applies, initialing AGENCY, and dates of action.

None
The Contractor further certifies that it shall not knowingly enter into any transaction with any subcontractor, material supplier, or vendor who is debarred, suspended, declared ineligible, or voluntarily excluded from covered transactions by any federal or state department/agency.

NOTE: Providing false information may result in criminal prosecution or administrative sanctions.

The above certification is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signa fi this Conification Company
altens
Signature
Title Jeff Galterio, Assistant Secretary
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
Sully-Miller
This bidder Contracting Compan roposed subcontractor*********************** hereby certifies Employment Opportunity, all reports that are under the applicable filing requirements.

Company: Sully-Miller Contracting Company
By:

Title: Jeff Galterio, Assistant Secretary
Date: February 23, 2023
The above certification is required by the Equal Employment Opportunity of the Secretary of Labor (41 CFR 60-1.7(b)(1)) and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause as set forth in 41 CFR 60-1.5, (Generally only contracts or subcontracts of $10,000 or under are exempt.) Currently, the Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.

Proposed prime CONTRACTORS/BIDDER and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b)(1) prevents the award of contracts and subcontracts unless such BIDDER submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

BUY AMERICA CERTIFICATION
(STEEL OR MANUFACTURED PRODUCTS)
[61 FR 6302, Feb. 16, 1996, as amended at 74 FR 30239, June 25, 2009] Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
General Requirement (as stated in 49 CFR 661.5)
Except as provided in 49 CFR 661.7 and 49 CFR 661.11, no funds may be obligated by FTA for a grantee project unless all tron, steel, and manufactured products used in the project are produced in the United States. (b) All steel and iron manufacturing processes must take place in the United States, except metallurgical processes involving refinement of steel additives.

The steel and iron requirements apply to all construction materials made primarily of steel or iron and products or rolling stock, or to bimetallic power rail incorporating steel or iron components. (d) For a manufactured product to be considered produced in the United States:
(1) All of the manufacturing processes for the product must take place in the United States; and
All of the components of the product must be of U.S. origin. A component is considered of U.S. origin if it is manufactured in the United States, regardless of the origin of its subcomponents. f steel, iron, or manufactured products (as defined in 49 CFR 661.3 and 661.5) are being procured, th appropriate certificate as set forth below shall be completed and submitted by each bidder or offeror i accordance with the requirement contained in 49 FR 661.13(b).

Certificate of COMPLIANCE with Buy America Requirements.

The bidder or offeror hereby certifies that it will comply with the requirements of 49 U.S.C. 5323(i)(1), and the applicable regulations in 49 CFR part 661.

Company_Sully-Miller Contracting Company
Name Jeff Galterio Title Assistant Secretary
Signature Date February 23, 2023
Certificate of NON-COMPLIANCE with Buy America Steel or Manufactured Products Requirements The bidder or offeror hereby certifies that it cannot comply with the requirements of 49 U.S.C. 5323(J), but it may qualify for an exception to the requirement pursuant to 49 U.S.C. 5323(J)(2), as amended, and the applicable • regulations in 49 C.F.R. 661.7.

Company_
Name Title
Signature Date
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Sections 2200 et seq.)
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
As required by California Public Contract Code section 2204, Proposer certifies that the option checked below relating to Proposer's status in regard to the Iran Contracting Act of 2010 (Public Contract Code sections 2200 et seq.) is true and correct:

Proposer is not:
(i) identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code section 2203; or (ii) a financial institution that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

Los Angeles County has exempted Proposer from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, Los Angeles County will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to Proposer for the Project is less than $1,000,000.

CERTIFICATION
I, the official named below, CERTIFY UNDER PENALTY OF PERJURY, that 1 am duly authorized to legally bind the Proposer to the above selected option. This certification is made under the laws of the State of California.

Contractor
Sully-Miller Contracting Company If Saltedo
Firm
February 23, 2023 Jeff Galterio, Assistant Secretary
Date Name/Title
Note: In accordance with Public Contract Code section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equai to the greater of $250.000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years.

END OF DOCUMENT
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB912F2B8 Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offor/application a. initial
b. grant b. initial award b. material change
c. cooperative agreement c. post-award
d. loan For Material Change Only:
e. Loan guarantee year quarter
f. loan insurance date of last report

4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Subawardee Enter Name and Address of Prime
Prime •Subawardee
N/A Tier. → ifknown
Congressional District, if known Congressional District, if known

6. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, it applicable

8. Federal Action Number, if known: 9. Award Amount, if known:

10. Nam andra, as same it and m 11. Individuals Performing Services (including address if different from No. 10)
(last name, first name, MI
(attach Continuation Sheets) if necessary)

12. Amount of Payment (check all that apply) 14. Type of Payment (check all that apply) actual •planmed a. relainer
b. one-time fee

13. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
E a. in indi specify nature. a deferred
Value f. other, specify

15. Brief Description of Services Performed or to be performed and Datc(s) of Servicc, includin fficer (s), employee(s), or member(s) contacted, for Payment Indicated in Item 12 (attach Continuation Sheets) if necessary)

16. Continuation Sheets) attached: Yes O
- Salters
Print Name: Jeff Galterio
Title: Assistant Secretary
Telephone No.: 714/578-9600 Date: 02/23/23
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
Standard Form LLL Rev. 04-28-06
Distribution: Orig- Local Agency Project Files

Page 1 ends

LPP 13-01 May 8, 2013
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
INSTRUCTIONS FOR COMPLETING EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES initiation or receipt of covered federal action or a material change to previous filing pursuant to title 31 U.S.C. Section 1352.

The liling of a form is required for such payment or agreement to make payment to lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress an officer or employee of Congress of n employee of a Member of Congress in connection with a covered tederal action. Attach a continuation sheet for additiona information if the space on the form is inadequate. Complete all items that apply for both the initial filing and material information.

1. Identify the type of covered federal action for which lobbying activity is or has been secured to influence, the outcome of a covered federal action,

2. Identify the status of the covered federal action.

3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last, previously submitted report by this reporting entity for this covered federal action.

4. Enter the full name, address, city, statc, and zip code of the reporting entity. Include Congressional District if knowa, Check the appropriate classification of the reporting entity that desiguates if it is or expects to bo a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the first tier. Subawards include but are not limited to:
subcontracts, subgrants, and contract awards under grants.

5. If the organization filing the report in Item 4 checks "Sabawardee" then enter the full name, address, city, state, and zip code of the prime federal recipient. Include Congressional District, if known.

6. Enter the name of the federal agency making the award or loan commitment. Include at least one organization level below agency name, if known. For example, Department of Transportation, United States Coast Guard,

7. Enter the federal program name or description for the covered federal action (item I). If known, enter the full Catalog of Federal Domestic Assistance (CEDA) number for grants, cooperative agreements, loans and loan commitments.

8. Enter the most appropriate federal identifying number available for the federal action identificalion in item 1 (e.g., Request for Proposal (RFP) number, Invitation for Bid (LFB) number, grant announcement number, the contract grant, or loan award number, the application/proposal control number assigned by the federal agency). Include prefixes, eg, "RFP-DE-90-001."

9. For a covered federal action where there has been an award or loan commitment by the Federal agency, enter the federal amount of the award/loan commitments for the prime entity identified in item 4 or 5.

10. Enter the full name, address, city, state, and zip code of the lobbying entity engaged by the reporting entity identified in Item 4 to influcnco the covered federal aetion.

11. Enter the full names of the individual(s) performing services and include full address if different from 10 (a), Enter Last Name, First Name and Middle Initial (MI).
[2. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (Item 4) to the lobbying entity Item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this i a material change report, enter the cumulative amount of payment made or planned to be made.

13. Check all boxes that apply, If payment is made through an in-kind contribution, specify the nature and value of the in-kind payment.

14. Check all boxes that apply. If other, specify nature.

15. Provide a specific and detailed description of the services that the lobbyist has performed or will be expected to perform and the date(s) of any services rendered. Inchide all preparatory and related activity not just time spent in actual contact with federal officials. Identify the federal officers) or employee(s) contacted or the officers) employee(s) or Member(s) of Congress that were contacted.

16. Check whether or not a continuation sheets) is attached.

17. The certifying official shall sign and date the form, and print his/ter name title and telephone number.

Public reporting burden for this collection of information is cstimated to average 30-minutes per response, including time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the coilection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0040), Washington, D.C. 20503. SF- LLL-Instructions Rev. 06-04

Page 2 ends

LPP 13-01 May 8, 2013
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 N/A

BIDDER'S BOND
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
Proposals must be accompanied by a proposal guarantee consisting of a certified check, cashier's check or BIDDER's bid bond payable to the CITY or cash deposit in the amount not less than ten (10) percent of the total amount bid. Certified check, cashier's check or Bidder's bid bond must be received at City Halt, 23920 Valencia Blvd., Santa Clarita, CA 91355, Attn: Purchasing, Suite 120, and marked with the words "BID BOND FOR" and the bid #, no later than the bid closing date and time, for the BIDDER to be considered responsive.

NOTE: The following form shall be used in case check accompanies bid.

Accompanying this Proposal is a *certified/cashier's check payable to the order of the City of Santa Clarita for: dollars ($_ _), this amount being not
less than ten percent (10%) of the total amount of the bid. The proceeds of this check shall become the property of said CITY provided this Proposal shall be accepted by said CITY through action of its legally constituted contracting authorities, and the undersigned shall fail to execute a contract and furnish the required bonds within the stipulated time; otherwise, the check shall be returned to the undersigned.

Project Name: 2021-2022 Federal Resurfacing Project
Bid No. CIP-22-23-M0142
Project No. M0142
Bidder's Signature

CONTRACTOR/BIDDER
Address
City, State, Zip Code
* Delete the inapplicable work.

NOTE: If the bidder desires to use a bond instead of a check, the following form shall be executed.

The sum of this bond shall be not less than ten percent (10%) of the total amount of the bid.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

PROPOSAL GUARANTEE BID BOND
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
KNOW ALL PERSONS BY THESE PRESENTS that Sully-Miller Contracting Company → as BIDDER, and Liberty Mutual Insurance Company _as SURETY, are held and firmly bound unto the City of Santa Clarita, as CITY, in the penal sum of_ *Ten Percent of tars total amount bj, which is ten percent (10%) of the total amount bid by BIDDER to CITY for the above-stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to CITY for the above-stated project, if said bid is rejected, or if said bld is accepted and the contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of CITY.

IN WITNESS WHEREAS, the parties hereto have set their names, titles, hands, and seals, this 22nd _Day of February -2023.

CONTRACTOR: JEFF GALTERIO,
Name and Title of Signatory
_Sully-Miller Contracting Company
Legal Name of Bidder
135 S State College Blvd., Ste 400, Brea, CA 92821
Bidder Address
714-578-9655 33-0787630
Telephone Number Federal Tax I.D. No.

Utora M. Carpall
SURETY*: Liberty Mutual Insurance Company
Name Victoria M. Campbell, Attorney-in-Fact
513-792-1862 [email protected]
Phone Number and Email
8044 Montgomery Rd., Ste 150E, Cincinnati, OH 45236
Address
*Provide BIDDER and SURETY name, phone number, email, and the name, title, address, and phone number for authorized representative. IMPORTANT - Surety Companies executing Bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the State where Contractor and Surety signatures must be notarized prior to submittal.

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that documen State of California
County of Orange
On _ March 4, 2023 before me, - J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

J. DANIELS
Notary Public - California
Orange County Signature
Commission # 2377975
My Corm. Expires Oct 9, 2025
J. Daniels, Notary Public
Place Notary Seal Above
- OPTIONAL -
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached DoCroposal Guarantee Bid Bond _ Document Date: February 22, 2023 Title or Type of Document:

Number of Pages: 1 Signers) Other Than Named Above: _
Capacity(ies) Claimed by Signers)
Signer's Name: Jeff Galterio Signer's Name:

X Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Guardian or Conservator • Guardian or Conservator
• Other: • Other:
signer Is Representing: Signer Is Representing: _
Sully-Miller Contracting Company
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 :::11
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange
On FEB 2 2 2023 before me, L. Clark, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared Victoria M. Campbell
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose names) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct
WITNESS my hand and official seal.

L. CLARK
Notary Public - California
Los Angeles County Signature
Commission # 2336730
My Comm. Expires Nov 28, 2024 Signature of Notary Public Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Document Date: FEB 2 2 2023
Title or Type of Document:

Number of Pages: Signers) Other Than Named Above:

Capacity(ies) Claimed by Signers)
Signer's Name: Signer's Name:
] Corporate Officer - Title(s): • Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual X Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: _ Signer Is Representing:
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated Liberty Liberty Mutual Insurance Company
Mutual. The Ohio Casualty Insurance Company Certificate No: 8205201-971932 West American Insurance Company
SURETY

POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organizec under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Khoi Tran:

Victoria M. Campbell
all of the city of Los Angeles state of CA each individually if there be more than one named, its true and lawful attorney-in-fact to make, of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper execute, seal, acknowledge and deliver, for and on its behaif as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance persons.

IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this day of April 2021
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
CASUALTy INSURANCE RANC MERICAN I CORPORATEL West American Insurance Company 1912 1919 1991
OIHO HOW HAMPERE Hail Cag
INDIANA By:

ANNI THI LS3M
David M. Carey, Assistant Secretary
State of PENNSYLVANIA ss
County of MONTGOMERY
_ 2021before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance (POA) verification inquiries, letter of credit, On this Sth day of April
Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer. interest rate or residual value guarantees IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.

RESA PASTELLA Commonwealth of Pennsylvania - Notary Seal Teresa Pastella, Notary Public
Montgomery County Pastella please call 610-832-8240 or email [email protected] My commission expires March 28, 2025 By:

Commission number 1126044
SHAST VANT Teresa Pastella, Notary Public
Member, Pennsylvanla Association of Notaries
NOTAR! PUBL
Not valid for mortgage, note, loan, This Power of Attorey is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: For bond and/or Power of Attorev ARTICLE IV-OFFICERS: Section 12. Power of Attorney.

Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President currency rate, may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.

ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.

Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shali appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shail be as binding as if signed by the president and attested by the secretary.

Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys-in- fact ag may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as thouah manually affixed.
1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked.

IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 22nd _ day of February__2023

INSURANCE RICAN INSURANCE

CORPORA CORPORATE CORPORATE
191 8 1919 1991 Ram clu
AH HAMPI By:

INDIANA Renee C. Llewellyn, Assistant Secretary
LS3M
LMS-12873 LMIC OCIC WAIC Multi Co 02/21
DocuSign Envelape ID: E93061F8-0029-4AB9-83E0-B2ADB942F2B8

NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106) Bid #CIP-22-23-MO142
:
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
To the CITY OF SANTA CLARITA:

In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106, the Bidder declares that the bld is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not In any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THE "BIDDER'S CERTIFICATION" SHALL

ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH FORM A PART OF THE PROPOSAL. BIDDERS ARE CAUTIONED THAT MAKING A FALSE CERTIFICATION MAY SUBJECT THE CERTIFIER TO CRIMINAL PROSECUTION.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

NON-COLLUSION AFFIDAVIT
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California

TO BE EXECUTED BY EACH BIDDER OF A PRINCIPAL CONTRACT

STATE OF CALIFORNIA

COUNTY OF LOSANHELES
Orange
Jeff Galterio being first duly sworn deposes and says that he/she is the Assistant Secretary (sole owner, a partner, president, etc.) of the party making the foregoing bid; that such
bid is holmade Gone interest of or beal of any undisclosed person, partnership, company, association, organization or corporation, that such bid is genuine and not collusive or sham, that said BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, or that anyone shall refrain from bidding, that said BIDDER has not in any manner, directly or indirectly sought by agreements, communication or conference with anyone to fix the bid price of said BIDDER or of any other BIDDER, orto fix the overhead, profit, or cost element of such bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in such bid are true, and further, that said BIDDER has not, directly or indirectly, submitted its bid price, or any breakdown thereof, or the contents thereof, or divulged information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company, association, organization, bid depository, or to any member or CITY thereof, or to any other individual information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company association, organization, bid depository, or to any member or CITY thereaf, orto any other individual, except to such person or persons as have a partnership or other financial interest with said BIDDER in his general business.

Bidder: Self Salters
Title Jeff Galterio, Assistant Secretary
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange
On_ March 4, 2023 before me, _ J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

J. DANIELS WITNESS my hand and official seal.

Notary Public - California
Orange County
Commission # 2377975
My Comm. Expires Oct 9, 2025 Signature
Place Notary Seal Above
- OPTIONAL -
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Docon-Collusion Affidavit
Title or Type of Document: Document Date: February 23, 2023 Number of Pages: 1 . Signer(s) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:

X Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Guardian or Conservator • Guardian or Conservator
• Other: • Other:

Signer Is Representing: Signer Is Representing: _
Sully-Miller Contracting Company
x0400000cưxĐ xẩ xẩ Đư xư c0000000000000000x000909000000 ©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

SECTION D
Subcontractor Information and DBE
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

SUBCONTRACTORS
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MD142
City of Santa Clarita, California

1. SUBCONTRACTORS. The BIDDER perform not less than 30% percent of the original contract work with the bidder's own organization.

2. LIST OF SUBCONTRACTORS. No more than 70% of the work, as defined by the contract price, may be done by subcontractors. Copies of subcontracts will be provided to the City Engineer upon his request.

2.1. Each BIDDER must submit with his bid the following:

2.1.1. The Full name of each subcontracting firm as required by Government Code, Sec. 4201, typed or legibly printed.

2.1.2. The address of each firm.

2.1.3. The telephone number at the place of business.

2.1.4. Work to be performed by each subcontracting firm.

2.1.5.Total approximate dollar amount of each subcontract.

2.1.6.If sub-contractor is participating as a Disadvantaged Business Enterprise (DBE), the following additional information is required on the "Designation of Subcontractors" form enclosed:

2.1.6.1. Status as a DBE, age of the firm and the annual gross receipts.

2.2. Submit the "Designation of Subcontractors" form enclosed herewith. No Contract shall be considered unless such list is submitted as required.

3. PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS. A prime contractor or subcontractor shall pay to any subcontractor, not later than seven days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the contractor on account of the work performed by the subcontractors, to the extent of each subcontractor's interest therein in accordance with the provision in Section 7108.5 of the California Business and Professions Code concerning prompt payment to subcontractors. in the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the prime contractor or subcontractor to a subcontractor, the prime contractor or subcontractor may withhold no more than 150 percent of the disputed amount. Any violation of this section shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subcontractor, of 2 percent of the amount due per month for every month that payment is not made. In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorney's fees and costs. The sanctions authorized under this section shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal. This provision applies to both DBE and non-DBE subcontractors. 4, CALIFORNIA DEBARRED CONTRACTORS AND SUBCONTRACTORS. Sections 1720 et seq. of the Labor Code and Section 6109 of the Public Contract Code apply to the Contract, and each potential bidder DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 and Subcontractor is responsible to be in full compliance with those laws. If a potential bidder or subcontractor has been found by the California Labor Commissioner to be in violation of Section 1720 et seq. of the Labor Code, in accordance with Section 1777.1of the Labor Code, the potential bidder shall be ineligible to bid or be awarded a contract orto perform work on any City public works project.

In accordance with Section 6109 of the Public Contract Code any subcontractor who is ineligible to perform work on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code is prohibited from performing work on any City public works project. Pursuant to Section 6109(b) of the Public Contract Code, any contract on a City public works project entered into between a bidder and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any City money for performing work as a subcontractor on a City public works contract, and any City moncy that may have been paid to a debarred subcontractor by a bidder on the project shall be returned to the City. The bidder shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the City project.

5. PERFORMANCE OF SUBCONTRACTORS.
5,1. The subcontractors listed by the Contractor in conformance with Section 3-3, "Subcontracts" of the (SSPWC), shall perform the work and supply the materials for which they are listed, unless the Contractor has received prior written authorization to perform the work with other farces or to obtain the materials from other sources.

5.2. The Contractor should notify the Engineer in writing of any changes to its anticipated DBE participation. This notice should be provided prior to the commencement of that portion of the work.

5.3. The subcontractors listed by you in the Contract Documents shall list therein the name and address of each subcontractor to whom the bidder proposes to subcontract portions of the work in an amount in excess of one-half of one percent of the total bld or $10,000, whichever is greater, in accordance with the Subletting and Subcontracting Fair Practices Act, commencing with Section 4100 of the Public Contract Code. The bidder's attention is invited to other provisions of the Act related to the imposition of penalties for a failure to observe its provisions by using unauthorized subcontractors or by making unauthorized substitutions.

6. DISADVANTAGED BUSINESS ENTERPRISE (DBE) PARTICIPATION.

At the time of contract execution, Contractor committed to utilize Disadvantaged Business Enterprise(s) ("DBE") in the performance of this DOT-assisted contract, and further agrees to ensure that any DBE subcontractors listed on the "DBE Participation Commitment Form," will perform work and/or supply materials in accordance with original commitments, unless otherwise directed and/or approved by City prior to Contractor effectuating any changes to its race-conscious DBE participation commitments). Contractor shall comply with all the requirements set forth in the "DBE

CONTRACT PROVISIONS FOR DOT-ASSISTED CONTRACTS WITH DISADVANTAGED BUSINESS ENTERPRISE (DBE) GOALS" which is attached to and, by this reference, incorporated in and made a part of this Agreement.

7. SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM. The City of Santa Clarita (City) has adopted a Disadvantaged Business Enterprise (DBE) Program, in conformance with Title 49 CFR Part 26, "Participation by Disadvantaged Business Enterprises in Department of Transportation (DOT) Financial Assistance Programs."
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 This DOT-assisted contract is subject to these stipulated regulations and the City's DBE program, which are incorporated in their entirety by this reference.

In the event of any conflicts or inconsistencies between the Federal Regulations and the City's DBE Program with respect to DOT-assisted contracts, the Federal Regulations must prevail.

7.1. DBE Goal. In conformance with the City's DBE Policy and Program, the City has established a 22% DBE contract-specific goal on this project. Bidders/Offerors are required to demonstrate DBE responsiveness towards meeting the DBE contract-specific goal on this project to be eligible for award.

7.2. DBE Bid Submission Requirement To be responsive, bidders must complete and submit the farms listed below with their bids or as otherwise specified in the IF instructions:
"DBE Participation Commitment Form"
"Bidders List"
Participation Commitment Form)
• "DBE Good Faith Effort Form" (required if DBE contract-specific goal not met)

7.2.1. "DBE PARTICIPATION COMMITMENT FORM" « required at time of bid Bidders will be required to either meet or exceed the contract goal by submitting a completed "DBE Participation Commitment" Form," or by demonstrating adequate good faith efforts were undertaken towards meeting the DBE goal. Failure to submit a completed and signed "Disadvantaged Business Enterprise (DBE) Participation Commitment Form" will deem the bidder non-responsive. Bidder must submit a completed "Disadvantaged Business Enterprise (DBE) Participation Commitment Form" even if zero DBEs are listed towards meeting the DBE contract goal.

7.2.2 "LETTER OF INTENT AND AFFIRMATION" - required at time of bid For each DBE proposed for this IF, bidder must also submit a signed and dated "Letter of Intent and Affirmation", from each DBE listed on the "DBE Participation Commitment Form," acknowledging that the DBE is participating in the contract for the specified dollar value and scope of work listed on the "DBE Participation Commitment Form." The dollar amount and scopes in the Letter of Intent and Affirmation, and the dollar amount and scope reflected on the "DBE Participation Commitment Form" must match identically.

7.2.3."BIDDERS LIST" required at time of bid or no later than 48 hours after the City's bid due date
The City is required to create and maintain a "Bidders List" of firms bidding or quoting on the City's DOT-assisted contracts, for use in the City's Overall DBE goal-setting process. The bidder must submit a "Bidders List" which will include all firms, both DBE and nonDBE, that submitted proposals, quotes or bids to the bidder on this contract, whether or not they were actually selected for work.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

7.2.4. "DBE GOOD FAITH EFFORT Form" required at time of bid or no later than 48 hours after the City's bid due date
The bidder must make good faith efforts to meet the DBE goal. Bidder can meet this requirement by actually meeting the DBE goal by documenting commitments for participation from DBE firms sufficient for this purpose. Alternatively, a bidder may submit a "Good faith Effort Form", demonstrating that it took all necessary and reasonable steps to achieve the DBE goal which, by their quantity, quality, and intensity, could reasonably be expected to obtain sufficient DBE participation, even if the bidder was not fully successful in obtaining the participation.

If a bidder submits a "DBE Participation Commitment Form" that does not list sufficient DBE participation to meet the established DBE contract goal, the bidder should submit the "DBE Good Faith Effort Form" and all applicable documentation at the time of bid or no later than 48 hours after the City's bid due date, to demonstrate that an adequate Good Faith Effort was made to meet the established DBE contract goal.

If a bidder has met the DBE goal based on the participation of DBEs listed on the bidder's "DBE Participation Commitment Form" "submission of the "DBE Good Faith Effort Form" is not mandatory but is strongly encouraged, as submission of Good Faith Efforts documentation can protect the bidder's eligibility for award of the contract if the City determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid submission or the bidder made a mathematical error. DBE firm was not certified at bid submission or the bidder made a mathematical error.

7.2.5.Good Faith Effort Reconsideration
The City will notify in writing any bidder that it determines has not met the DBE contract goal and has not demonstrated an adequate Good Faith Effort. The notification will include the reasons for the determination. The bidder may request reconsideration within three business days of notification of non-responsiveness. The reconsideration process will be facilitated by the City's Reconsideration Official, who will act as an independent, impartial party and will not have been involved in the initial Good Faith Effort evaluation.

As part of the reconsideration process, the bidder will have the opportunity to provide mitigating evidence as to whether the bidder met the DBE contract goal or made an adequate GFE to do so as set forth in the solicitation.

After the reconsideration hearing, the bidder will receive the final determination within sevén working days of the hearing date. The result of the reconsideration process is not administratively appealable to the Department of Transportation or the City's Board of Directors.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-G
Construction Contract DBE Commitment
EXHIBIT 15-G CONSTRUCTION CONTRACT DBE COMMITMENT

1. Local Agency: City of Santa Clarita 2. Contract DBE Goal: 22%

3. Project Description: 2021-2022 Federal Resurfacing Project

4. Project Location: Various Locations

5. Bidders Name: Sully-Miller Contracting Company Prime Certified DBE: D 7. Bid Amount: $3,962,301.40

8. Total Dollar Amount for ALL Subcontractors:# 1,249,8411.00 E 9. Total Number of ALL Subcontractors: 6 6324086662,829.00

10. Bid 12. DBE 14. DBE

11. Description of Work, Service, or Materials Certification 13. DBE Contact Information Dollar Item Supplied (Must be certified on the date bids are opened) Number Number Amount
IMSTRaNsPORT 951-616-31328
VARIoUS 30321 2005 5. DATE ANE. BLODINGTON, CA $402,012.00 AL OIL ATRAZING 92316
De TRAFI CONTROL
VARIOUS TRAFFIL CONTEOL 45046 13905 ARTESIA BLUD CERRITOS, CA 40703 152, 000.00 ETT
vARIous SWEEPING 40089 LOZSWi MOISTAN ANE LAHABRi, LA $50,000.00 90631
REYNAGA TRANSfORMATION
VARIOUS 42110 LOSES LINDENULLE RODE WHITTIER, LA $165,000.00 90600
TRAFAK LOOPS LeACHFILING
32-34 VASELORS 38033 946S. EMERALA ST ANAHEIM, LA 1204,175.00 42404
Local Agency to Complete this Section upon Execution of Award 873,187.00 $0.00

21. Local Agency Contract Number:

15. TOTAL CLAIMED DBE PARTICIPATION

22. Federal-Ald Project Number:

0.00 23. Bid Opening Date: 27%

24. Contract Award Date:

IMPORTANT: Identify all DBE firms being claimed for credit,

25. Award Amount: regardless of tier. Names of the First Tler DBE Subcontractors and Local Agency certifies that all DBE certifications are valid and information on this form is complete and accurate.

February 23, 2023
26: Local Agency Representative's Signature 27. Date 17. Date 714/578-9600
28: Local Agency Representative's Name 29. Phone 18. Preparer's Name 19. Phone Assistant Secretary

30. Local Agency Representative's Title 20. Preparer's Title LPP 18-01 Page 1 of3
January 2019
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-G
Construction Contract DBE Commitment
ADA Notice: or Individuals with sensory disablitles, this document is available in alternate formats. For Information call (916) 654-6410 or TDD (916) 654 380 or write Records and Forms Manacement, 1120 N Street, MS-89, Sacramento, CA 9581

INSTRUCTIONS - CONSTRUCTION CONTRACT DBE COMMITMENT

CONTRACTOR SECTION

1. Local Agency - Enter the name of the local agency that is administering the contract.

2. Contract DBE Goal - Enter the contract DBE goal percentage as it appears on the project advertisement.

3. Project Location - Enter the project location(s) as it appears on the project advertisement.

4. Project Description - Enter the project description as it appears on the project advertisement (Bridge Rehab, Seismic Rehab, Overlay, Widening, etc.

5. Bidder's Name - Enter the contractor's firm name.

6. Prime Certified DBE - Check box if prime contractor is a certified DBE.

7. Bid Amount - Euter the total contract bid dollar amount for the prime contractor.

8. Total Dollar Amount for ALL Subcontractors - Enter the total dollar amount for all subcontracted contractors.

SUM = (DBEs + all Non-DBEs). Do not include the prime contractor information in this count.

9. Total number of ALL subcontractors - Enter the total number of all subcontracted contractors. SUM = (DBEs + all Non-DBEs). Do not include the prime contractor information in this count.

10. Bid Item Number - Enter bid item number for work, services, or materials supplied to be provided.

11. Description of Work, Services, or Materials Supplied - Enter description of work, services, or materials to be provided. Indicate all work to be performed by DBEs including work performed by the prime contractor's own forces, if the prime is a DBB. If 100% of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms.

12. DBE Certification Number - Enler the DBE's Certification Identification Number. All DBEs must be certified on the date bids are opened

13. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted contractors.

Also, enter the prime contractor's name and phone number, if the prime is a DBE.

14. DBE Dollar Amount - Enter the subcontracted dollar amount of the work to be performed or service to be provided. Include the prime contractor if the prime is a DBE. See LAPM Chapter 9 for how to count full/partial participation.

15. Total Claimed DBE Participation - $: Enter the total dollar amounts entered in the "DBE Dollar Amount" column. %: Enter the total DBE participation claimed ("Total Claimed DBE Participation Dollars" divided by item "Bid Amount"). If the total % claimed is less than item "Contract DBE Goal," an adequately documented Good Faith Effort (GFE) is required (see Exhibit 15-H DBE Information - Good Faith Efforts of the LAPM).

16. Preparer's Signature - The person completing the DBE commitment form on behalf of the contractor's firm must sign their name.

17. Date - Enter the date the DBE commitment form is signed by the contractor's preparer.

18. Preparer's Name - Enter the name of the person preparing and signing the contractor's DBE commitment form.

19. Phone - Enter the area code and phone number of the person signing the contractor's DBE commitment form.

20. Preparer's Tille - Enter the position/title of the person signing the contractor's DBE commitment form.

LOCAL AGENCY SECTION

21. Local Agency Contract Number - Enter the Local Agency contract number or identifier.

22. Federal-Aid Project Number - Enter the Federal-Aid Project Number(s).

23. Bid Opening Date - Enter the date contract bids were opened.

24. Contract Award Date - Enter the date the contract was executed.

25. Award Amount - Enter the contract award amount as stated in the executed contract.

26. Local Agency Representative's Signature - The person completing this section of the form for the Local Agency must sign their name to certify that the information in this and the Contractor Section of this form is complete and

27. Date - Enter the date the DBE commitment form is signed by the Local Agency Representative.

28. Local Agency Representative's Name - Enter the name of the Local Agency Representative certifying the contractor's DBE commitment form.

29. Phone - Enter the area code and phone number of the person signing the contractor's DBE commitment form.

LPP 18-01 Page 2 of 3
January 2019
locuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B vocal Assistance Procedures Manua Exhibit 15-G
Construction Contract DBE Commitment

30. Local Agency Representative Tille - Enter the position/title of the Local Agency Representative certifying the contractor's DBE commitment form.

LPP 18-01 Page 3 of 3
January 2019
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
EXHIBIT 15-H: PROPOSER/CONTRACTOR GOOD FAITH EFFORTS
Cost Proposal Due Date PE/CE
Federal-aid Project No(s). STPL-5450(102) Bid Opening Date March 9, 2021 CON The City of Santa Clarita established a Disadvantaged Business Enterprise (DBE) goal of

22.00° for this contract. The information provided herein shows the required good faith efforts to meet or exceed Proposers or bidders submit the following information to document their good faith efforts within five (5) calendar days from cost proposal due date or bid opening. Proposers and bidders are recommended to submit the following information even if the Exhibit 10-01: Consultant Proposal DBE Commitments or Exhibit 15-G:

Construction Contract DBE Commitment indicate that the proposer or bidder has met the DBE goal. This form protects the proposer's or bidder's eligibility for award of the contract if the administering agency determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid opening, or the bidder made a mathematical error.

The following items are listed in the Section entitled "Submission of DBE Commitment" of the Special Provisions, please attach additional sheets as needed:

A. The names and dates of each publication in which a request for DBE participation for this project was placed by the bidder (please attach copies of advertisements or proofs of publication):

Publications Dates of Advertisement
B. The names and dates of written notices sent to certified DEs soliciting bids for this project and he dates and methods used for following up initial solicitations to determine with certainty whether the BEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.):

Names of DBEs Solicited Date of Initial Solicitation Follow Up Methods and Dates

Page 1 of 3 ends

May 2020
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
C. The items of work made available to BE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of
(Y/N) Contract
Pick 0.00%
Pick 0.00%
Pick 0.00%
Pick 0.00%
D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE:

Names, addresses and phone numbers of rejected DEs and the reasons for the bidder's rejection of the DBEs:

Names, addresses and phone numbers of firms selected for the work above:

E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was provided to DBEs:

Page 2 of 3 ends

May 2020
DocuSign Envelope ID: E93D81F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
F. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining anding, lines of credit or insurance, necessary equipment, supplies, materials, or related assistance o services, excluding supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate:
...

G. The names of agencies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE firms (please attach copies of requests to agencies and any responses received, i.e., lists, Intornet page download, etc.):

Name of Agency/Organization Method/Date of Contact Results H. Any additional data to support a demonstration of good faith efforts:

Page 3 of 3 ends

May 2020
Docusign Envelops E300152-00 23 1238830-32D89425288 Exhibit 17-0 Disadvantaged Business Enterprises (DBE) Certifcation Status Change N/A
EXHIBIT 17-O DISADVANTAGED BUSINESS ENTERPRISES (DBE) CERTIEICATION STATUS CHANGE

1. Lecal Agency Contract Number / 2. Federal-Aid Project Number 3. Local Agenc T 4. Contraci Completion Date City of Santa Clarl:

5. Contractor/Consultant 6. Business Address 7. Final Cuntract Anount

10. DBE 12. Certification/

8. Contract 1. Amount Pale Decertification
Item 9. DBE Contact Information Cortification 13. Comments Nhlle Certifies Date
Number Number
(Lattor Altachod)
If thers ware no changes In the DBE certilication of subcontractors/subconsultants, indicale on the fam.

I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT

14. Contracior/Consultant Representative's Signature" T 18. Contractor/Consultant Representative's Name T 16. Phone T17. Date

CERTIFY THAT THE CONTRACTING RECORDS AND ON SITE PERFORMANCE OF THE DBES HAS BEEN MONITORED

18. Local Agency Represenfalves Sgnatura / 19. Local Agency Representative's Nem T 20. Phone 121. Date Diana Previlite 681 294-1425
DISTRIBUTION: Orighat - Local Agency, Copy Giarans District Local Assisiance Engineer. Incitude with Final Report of Expenditures ADA NOTICE aReA, i re, el a co A seal area are a man, a 08) 45-1213, cal alance racers Manua TrY 711 or te to Records and Forme

Page 1 of 2 ends

July 23, 2015
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Exhibit 17-0 Disadvantaged Business Enterprises (DBE) Certification Status Change

INSTRUCTIONS -DISADVANTAGED BUSINESS ENTERPRISES (DBE)

CERTIFICATION STATUS CHANGE

1. Local Agency Contract Number - Enter the Local Agency contract number or identifier.

2. Federal-Aid Project Number - Enter the Federal-Aid Project Number.

3. Local Agency - Enter the uame of the local or regional agency that is funding the contract.

4. Contract Completion Date - Enter the date the contract was completed.

5. Contractor/Consultant - Enter the contractor/consultant's firm name.

6. Business Address - Enter the contractor/consultant's business address.

7. Final Contract Amount - Enter the total final amount for the contract.

8. Contract Item Number - Enter contract item for work, services, or materials supplied provided. Not applicable for consultant contracts.

9. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted contractors/consultants.

10. DBE Certification Number - Enter the DBE's Certification Identification Number.

11. Amount Paid While Certified - Enter the actual dollar value of the work performed by those subcontractors/subconsultants during the time period they are certified as a DBE.

12. Certification/Decertification Date (Letter Attached) - Enter either the date of the Decertification Lelter sent out by the Office of Business and Economic Opportunity (OBFO) or the date of the Certification Certificale mailed out by OBEO.

13. Comments - If needed, provide any additional information in this section regarding any of the above certification status changes.

14. Contractor/Consultant Representative's Signature - The person completing the form on behalf of the contractor/consultant's firm must sign their name.

15. Contractor/Consultant Representative's Name - Enter the name of the person preparing and signing the form.

16. Phone - Enter the area code and telephone number of the person signing the form.

17. Date - Enter the date the form is signed by the contractor's preparer.

18. Local Agency Representative's Signature - A Local Agency Representative must sign their name to that the contracting records and on-site performance of the DBE(s) has been monitored.

19. Local Agency Representative's Name - Enter the name of the Local Agency Representative signing the

20. Phone - Enter the area code and telephone number of the person signing the form.

21. Date - Enter the date the form is signed by the Local Agency Representative.

Page 2 of 2 ends

July 23, 2015
cuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2l ocal Assistance Procedures manu Exhibit 12-B
Bidder's List of Subcontractors (DBE and Non-DBE)
Exhibit 12-B: Bidder's List of Subcontractor (DBE and Non-DBE) - Part 1 As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts must be registered with the State Division of Industrial Relations and certified to bid on Public Works contracts. Please register at https://www.dir.ca.gov/Public-Works/Contractor- Registration.html. The local agency will verify registration of all contractors and subcontractors on public works projects at bid and thereafter annually to assure that yearly registration is maintained throughout the life of the project.

In accordance with Title 49, Section 26.11 ofthe Code of Federal Regulations, and Section 4104 of the Public Contract Code of the State of California, as amended, the following information is required for each sub-contractor who will perform work amounting to more than one half of one percent (0.5%) of the Total Base Bid or $10,000 (whichever is greater).

FEDERAL PROJECT NUMBER:

Photocopy this form for additional firms. STPL-5450(102) Line Item & Description Percentage of Contractor License Number DBE Subcontractor Name & Location Subcontract DBE Cert Number Annual Gross Receipts Amount Bid Item (Y/N)
Subcontracted
DIR Reg Number
NAME < $1 million
6 - 8 PARTIAL < $5 million
LTI 754500 * < $10 million
SWEEPINEA $50,00000 Veerous
City, State 40089 < $16 millior
1000003423 As years in

LA HASED, LO
NAME 7-9 <$1 million
< $5 million
PRS 569352 <$10 million
11-12
City, State $ 241,756.00 100% XI < $15 million
SURUPA JELLEYLA 1000003363 20+
NAME T<$1 million
15-31 X < S5 million
PLI 415490 < $10 millio
STePING 172,440.00 100% N <$15 millior
City, State
mARKINaS As years in
AZUSA, LA 1000813536 115*
NAME < $1 millior
13-14 < $5 millior
EBS UTILITY 932798 x < $10 million
50-51 ADJUSTING #39000.00 N < $15 millior
City, State 100%
72-73 1000004246 As years in 20t

CORONA, LA
NAME <S1 million
32-341 652956 X < $5 million
TRAFFIL LOOP ORACKELLIWEA < $10 million
City, State ELSCTRICAL #204,175.00 100% 38033 <$15 million 1000003794 A years in 15+
AniAltErm, ca
NAME PARTIAL < $1 million
2,37,62 1015478 x <55 million
DE TRAFFIL LONTROL < $10 million
TRAFFIL CONTROL $ 52,000 00 2-20%- 45046
City, State < $15 million
37 - 60'i. Age of Firm in
LERRITOSICA 62 - 40% 1000039211
NAME - smilin
-similion
City, State
NAME < $1 million
< $5 millior
< $10 millior
City, State <$15 million
As farm in
NAME
-similon
City, State
Distribution - Original: Local Agency File; Copy: DLAE w/Award Package

Page 1 of 2 ends

September 2021
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 12-B
Bidder's List of Subcontractors (DBE and Non-DBE)
Exhibit 12-B: Bidder's List of Subcontractor (DBE and Non-DBE) - Part 2 In accordance with Title 49, Section 26 of the Code of Federal Regulations, the Bidder shall list all subcontractors who provided a quote or bid bu were notselected to participate as a subcontractoron this projec FEDERAL PROJECT NUMBER:

Photocopy this form for additional firms. STPL-5450(102) Subcontractor Name & Location Line Item & Description uhcontrac Percentage of Contractor License Number DBE Annual Gross Receipts moun Bid Item (YIN) DBE Cert Number
Subcontracted DIR Reg Number
NAME < $i million
7-4 621781
ABSL X < $5 million
11-R *4W0, 5co2 Iw% CT - CUS 270 < $10 millior
City, State ‹ S15 millior
Hayward, CA / 0000O 2818 Age of Firm in 15
m.lli=y years
NAME 1< $1 million
Superior Pevemat * ‹ $5 million
IS - 31 < $10 million
Cly, State "Р, 314" INY. 1<515 million
Сурчен, сн Striviny a Madeiys
NAME < $1 million
IS-3l
Chrisp * < $5 million
Compony *125, 44" 1vo% N < $10 millior
Cily, Stale T< $15 million
Stripiy " Markings Age of Firm in 15
Fremovo, CA years
NAME similion
-pEE 1< $5 milllon
‹ $10 million
City, State < $15 million
AZUSE, CA JE Age of Firm In
years
NAME < $1 million
13, 50, 73 398443 < $5 million
Manhole Adjustiy 5a6, e6, " 100% < $10 million
City, State N * < $15 millon
14,51, х 100U00 4104 A Grais in 15
Pico Rivra, CA years
NAME T< $1 million
32-34. Eldorical 172245 < $5 million
Tati Eleuiric 5158,4m7
1w%. ‹ $10 millicn
City, State x<$15 millicn
Venius, ch 1000000149 As years in
NAME < $1 millio
32-34 Blearial 652956 < $5 million
Traffic Laps Gracing *204, 175= * s5 milen
City, Slate Iw%. 38033
Anaheir, CA 1000003794 A germ in l15
NAME < $1 million
<$5mllln
City, Slate
Age of Firm In
years
NAME |< $1 million
< $5 million
< $10 million
Clty, State <$15 million
Age of Firm ir
years
Distribution - Original: Local Agency File; Copy: DLAE w/Award Package

Page 2 of 2 ends

September 2021
DocuSIgn Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IF TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea State:_ CA .. ZIp: 92821
•
Name of DBE firm: Lms TranspoRt
Address: 2005 S. Date Are
City: Doominaton State: CA _ Zip: 92314
Telephone: 951-616-3828
Description of work to be performed by DBE firm:

Oil supplyand haul
The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of his work $ 415,1930 402, 012.00
The percentage value of this work (in comparison to the total contract value)% tO tOfg10.14 Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values as stated above
By fishtay anten M
Tite Offamanage
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

Docusign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB842F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IF TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea . State: CA _ Zip: 92821
Name of DBE firm: DC TRAFFIC CONTROL
Address: 13905 ARTESIA BLUD
City: CERRITOS State: A _Zip: 90703
Telephone:

Description of work to be performed by DBE firm:

TRAFFIC CONTROL
The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of this work $ 52,000
The percentage value of this work (in comparison to the total contract value) % | • 3 Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values as stated above

AARON CALDERON
By
Tite PRESIDENT
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IF TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea - State:_ CA _Zip: 92821
Name of DBE Irm: Cindy Trump Inc.. BB2 Lindys Cold planing, Address: 1025 /N, Mountain Wew Ace
City: La Hubic _ State:_ _Zip: 20631
Telephone: 572:69t.225le
Description of work to be performed by DBE firm:

Asphalt winding, Sweeping and Dalverizing
The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of this work $ 50,000
The parcentage value of his work (n comparison to the total contract value) % 1 - 3.

Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values as stated above
By Briaona Trump
C.S.0.

Title
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IF TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea . State:_ CA _ Zip: 92821
•
Name of DBE firm: Traffic Loops Crackfilling, Inc.

Address:_946 S Emerald St
City: Anaheim _ State: CA _Zip: 92804
Telephone:_(714) 520-4026
Description of work to be performed by DBE firm:

Traffic Loops, Install Temporary Video Detection System, Traffic Nodes The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of this work $ 204,175.00
The percentage value of this work (in comparison to the total contract value) % S. 13 Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values By _
Title Vice President
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IFB NO:

IF TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea - State: CA _ Zip:_ 92821
Name of DBE firm: Reynaga Transportation Inc.

Address: 11721 Whittier Blvd #560
City: Whittier _ State: CA _. Zip:_90601
Telephone:_562-556-3657
Description of work to be performed by DBE firm:

Haul dirt, sand, gravel, and aggregate material.

The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of this work $ 15317500165,000.00
The percentage value of this work (in comparison to the total contract value) % 3-877. 4.16% Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values as stated above
By _ ARo.

Title Vice President
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

DocuSign Envelope ID: CA9C2A6A-9351-4BE2-94FD-FA630C834797 Addendum No. 1
March 2, 2023
Addendum No. 1
BID # CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City of Santa Clarita, California
This addendum must be acknowledged via BidNet and should be included with the bid response.

The purpose of this addendum is to address the following for this Bid:

I. UPDATE PREVAILING WAGE RATES
Please see the attached updated Federal Prevailing Wage Rates.

II.FINALIZED SIGNING AND STRIPING PLANS
Please see the attached finalized signing and striping plans.

Apprasgedby:

Damon Lets
Damon ....

City Engineer

END OF ADDENDUM
This addendum must be acknowledged via BidNet and should be included with the response.

I Laltena
March 2, 2023
ontractor's Representativ Date
Jeff Galterio, Assistant Secretary
Sully-Miller Contracting Company
Company Name
BID # CIP-22-23-M0142
DocuSign Envelope ID: 9C987C6B-CA37-49A7-8E17-B408EEADOBE1 Addendum No. 2
March 9, 2023
Addendum No. 2
BID # CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City of Santa Clarita, California
This addendum must be acknowledged via BidNet and should be included with the bid response. The purpose of this addendum is to address the following for this bid:

1. BID CLOSING DATE CHANGE
The bid closing date has been changed from March 9, 2023 before 2:00 PM (PT) to March 13, 2023 before 2:00 PM (PT).
pproved
Docusigned b
Vamon Lets 3/9/2023
City Engineer

END OF ADDENDUM
This addendum must be acknowledged via BidNet and should be included with the response.

March 9, 2023
Contractor's Representative Date
Jeff Galterio, Assistant Secretary
Sully-Miller Contracting Company
Company Name
BID # CIP-22-23-M0142
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8 Addendum No. 3
March 10, 2023
Addendum No. 3
BID # CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City of Santa Clarita, California
This addendum must be acknowledged via BidNet and should be included with the bid response. The purpose of this addendum is to address the following for this bid:

I. BID CLOSING DATE CHANGE
The bid closing date has been changed from March 13, 2023 before 2:00 PM (PT) to March 14, 2023 before 2:00 PM (PT).

II. INCLUSION OF COVER SHEET FOR PLANS
Please see the attached complete plans set that was originally missing the signed cover sheet.

III. UPDATED BID SCHEDULE
Please see the attached updated Bid Schedule. Line Item # 6 for Base Bid, Alternate 1, and Alternate 2 have been updated to the following: ARHM-GG-C instead of ARHM-GG-D This updated Bid Schedule must be filled out and submitted with the bid response.

IV. UPDATED GENERAL PROVISIONS
Please see the updated Section F - General Provisions. The following sections have been updated:

Removed section 400-2 (previously page GP-65)
• Updated sections 3-10.1, 3-10.4 (page GP-22)
V. UPDATED SPECIAL PROVISIONS - TECHNICAL
Please see the updated Section G - Special Provisions - Technical. The following sections have been updated:
• Section G2-5.4 (page 18)
• Section G2-8.2.2 (page 26)
Approved:

DocuSigned by:

Damon Lets
Damomtet2...

City Engineer
BID # CIP-22-23-M0142
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8 Addendum No. 3
March 10, 2023

END OF ADDENDUM
This addendum must be acknowledged via BidNet and should be included with the bid response.

All alters March 13, 2023
Contractor's Representative Date
Jeff Galterio, Assistant Secretary
Sully-Miller Contracting Company
Company Name
BID # CIP-22-23-M0142
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8

BID SCHEDULE
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
Fill out this form completely and submit with the bid response. Line item pricing must be entered on BidNet. In the event any mathematical discrepancies are found, please refer to Section B, Bid Instructions.

The award of contract, if made, will be to the lowest responsive BIDDER determined solely by the AGENCY.

The AGENCY also reserves the right to add/delete the quantities to the existing bid items, or delete the entire bid item if they are found not required by the Agency during the course of the construction, or add new bid items or scope of work by Contract Change Order at any time during the project up to the last contract working day.

The BIDDER agrees to hold all unit prices in this Bid Schedule constant throughout the duration of the project up to the last contract working day.

BASE BID
ITEM

DESCRIPTION QTY UNIT UNIT PRICE TOTAL
NO.

1. Mobilization, Bonds & Insurance
1 LS
$ 84,500.00 $ $4,500.00
Traffic Control

2. 1 LS $ 200,000.00
$ 200,000.00

3. Storm Water Pollution Control Program
1 LS $
$15,000.00 15,000.00

4. AC D2 PG 64-10 1,947 TN
$134.00 $ 260,398.00
AC C2 PG 64-10
1,197 TN $ 129.00
$ 154, 413.00
ARHM-GG-C PG 64-16 6,842 TN
$ 142.00 $971,564.00

7. Remove & Replace 4" AC 33,674 SF
$4.00 $ 134,696.00

8. Remove & Replace 6" AC 117,760 SF
$ 5.10 $ 600,576.00
Cold Plane 2"/ Transition Cold Plane from
2" to 4" 86,986 SF $ $
•75 65,239.50

10. Stabilization Allowance
15,144 SF $ 7.75
$ 117,366.00

11. Keycut A1
12,123 LF $3.00 $ 36,369.00

12. Keycut B1
347 LF $ 5,552. us

13. Lower Manhole Covers to Finish Grade
31 EA $ 554.00
$ 17,174.00

14. Adjust Manhole Covers to Finish Grade
31 EA $610.00 $ 18,910.00
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8

15. Install Blue RPM's @ Fire Hydrant 15 EA $ $

20.00 300.00

16. 12" White Crosswalk/Limit Line (Thermo) 1,058 LF
$ 4.00 $ 4,232.00

17. 12" Yellow Crosswalk/Limit Line (Thermo) 477 LF
$ 4.00 Si gotco
Striping Detail #12 (Thermo & Markers)

18. 13,678 LF
1-00 $ 13,678:00
Striping Detail #22 (Thermo & Markers) 631

19. LF $-300 $ 1.893.00

20. Striping Detail #24 (Thermo & Markers) 9,240
LF

1.50 $ 13,$60.00

21. Striping Detail #27 (Thermo & Markers) 52 LF
$ 3.000 $ 156.00

22. Striping Detail #38 (Thermo & Markers) 1,447
LF $ 3.00 $ 4,311.00

23. Striping Detail #38A (Thermo) 2,225
LF $ 3.00
$ 6,675.00

24. Striping Detail #39 (Thermo) 12,040 LF

1.50 $ 15,060.00

25. Striping Detail #39 (Thermo) 960 LF
$1.50 $ 1,440.00

26. Arrow Type IV (L/R) (Thermo) 30 EA
$ 150.00 $ 4,500.00
Legend "CLEAR"

27. 3 EA $ 430.00
$ 1,290.00

28. Legend "KEEP" 3 EA
$ 30000 $900.co

29. Legend "AHEAD" 7 EA
$ 430.00 $ 3,010.00

30. Legend "SIGNAL" 7 $
EA $ 2,590-00
370.00

31. Bike & Arrow Symbol 9 EA
$ 360.00 $ 5,040.00
Remove and Install Permanent Traffic

32. Loops 99 EA $ $
540.00 57,42000

33. Install Temporary Video Detection System 14 EA $
5,000.00 $ 70,000.00

34. Remove and Install Traffic Nodes 8 EA
$ 7,500.00 $ 20,000.00

35. Remove and Replace Local Depressions 357 SF
$ 75.00 $ 28,77500
TOTAL BASE BID AMOUNT: $2,940;325.50
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8

ALTERNATE BID SCHEDULES
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
ALTERNATE 1
ITEM

DESCRIPTION QTY UNIT UNIT PRICE TOTAL
NO.

Mobilization, Bonds & Insurance 1 LS
$ 15,000.00 $ 15,000.00
Traffic Control
1 LS $ 22,50000 § zz, sous
Storm Water Pollution Control Program

3. 1 LS $500.00 $
S0u 00

4. AC D2 PG 64-10 228
TN $ 32,376.00
142.00

5. AC C2 PG 64-10 1,745 TN
115.00 § 200, 675.00

6. ARHM-GG-C PG 64-16 800 TN $
$ 145.00
116,000.00
Remove & Replace 4" AC
8,708 SF $ 3.00 $ 26,124.00

8. Remove & Replace 6" AC 2,654
SF $7.00 $ 18,575.00
Remove & Replace 8" AC
6,138 SF $ 6-00 $36, 829.00

10. Stabilization Allowance
1,750 SF $ 53.10
$ 14,173.0

11. Cold Plane 2-1/2" 12,575 $
SF • 75 $ 9,431.25
Cold Plane 3" / Transition Cold Plane

12. from 3" to 5" 20,379 SF $ $
50 10,184.50
Cold Plane 8" / Transition Cold Plane

13. from 8" to 10" 20,125 SF $ $

1.30 26,162.50
Keycut B1 $

14. 90 LF $ 1600
1,440.00

15. Lower Manhole Covers to Finish Grade 1 EA
$ 550.00 55000

16. Adjust Manhole Covers to Finish Grade 1 EA
$ 30000 § 300.00
12" White Crosswalk/Limit Line (Thermo)

17. 87 LF

3.60 330.60

18. 12" Yellow Crosswalk/Limit Line (Thermo) 510 LF
$ 3.85 $ 1,963.50

19. Striping Detail #12 (Thermo & Markers) 1,518 LF
$ 1.25 $ 1,497.50

20. Striping Detail #22 (Thermo & Markers) 867 LF $

2.90 $ 2,514.30

21. Striping Detail #38 (Thermo & Markers) 159 LF
$2.75 437.25

22. Striping Detail #38A (Thermo) 1,274 LF $1.50
$ 1,911.00
DocuSign Envelope ID: 3DF4E5CC-054B-4EOF-84C6-02259A19BDE8

23. Arrow Type IV (L/R) (Thermo) 8 EA $ $
150.00 1,200.00
Remove and Install Permanent Traffic

24. Loops 16 EA $ $
695.00 i', '2000
Install Temporary Video Detection

25. System 3 EA $
4,55000 13,650.00
TOTAL ALTERNATE 1 BID AMOUNT: $565,$53.40
ALTERNATE 2
ITEM

DESCRIPTION QTY UNIT UNIT PRICE TOTAL
NO.

1. Mobilization, Bonds & Insurance 1 LS $ $
14,000.00 11,000.00
Traffic Control $
1 LS
15,000.00 15,000.00

3. Storm Water Pollution Control Program 1 LS $
500.00 $ 500.00

4. AC D2 PG 64-10 $
276 TN
130.00 35,880.00

5. AC C2 PG 64-10 930 TN $ $
110.00 102,300.00
ARHM-GG-C PG 64-16

6. 970 TN $ 145.00
$ 140, 650.00

7. Remove & Replace 5" AC 11,174 SF $
$ 4.00 44,696.00

8. Remove & Replace 8" AC 4,871 SF $ $
$.00 38,968.00

9. Stabilization Allowance SF
1,605 $ 4.00 $ 12,840.00
Cold Plane 3" / Transition Cold Plane from

10. 3' to 5' 21,400 SF $ $
- 50 10,700.00
Cold Plane 3-1/2" / Transition Cold Plane

11. from 3-1/2" to 5-1/2" 20,260 SF $
,50 10,13a0o

12. Keycut B1
90 LF $

16.00 $ 1,440.00

13. Lower Manhole Covers to Finish Grade
2 EA $ 1,080.00
$ 54000

14. Adjust Manhole Covers to Finish Grade 2 EA
$ 600.00 $ 1,200.00

15. 12" White Crosswalk/Limit Line (Thermo)
304 LF $ 3.50 $ 1,185.20

16. 12" Yellow Crosswalk/Limit Line (Thermo)
338 LF $3.80 $ 1,284.40

17. Striping Detail #12 (Thermo & Markers) 1,610 LF
$1.25 $ zp01z.50

18. Striping Detail #22 (Thermo & Markers) 942 LF
$ 2.90 $ 2, 731.80
DocuSign Envelope ID: 3DF4E5CC-054B-4E0F-84C6-02259A19BDE8

19. Striping Detail #27 (Thermo & Markers) 874
LF $ 2.90 $ 2,534.60

20. Striping Detail #38 (Thermo & Markers) 206 LF
$ 2.75 $ 566.50

21. Striping Detail #38A (Thermo)
450 LF $ 2.75 $1,237.50

22. Arrow Type IV (L/R) (Thermo)
4 EA $ 154.00 $616.00
Remove and Install Permanent Traffic

23. Loops 8 EA $ $
650.00 5.200.00

24. Install Temporary Video Detection System 2 EA $
$ 60,20000 12,40000
TOTAL ALTERNATE 2 BID AMOUNT: $ 456,122.50
The award of contract, if made, will be to the lowest responsive BIDDER determined solely by the AGENCY.

The AGENCY also reserves the right to add/delete the quantities to the existing bid items, or delete the entire bid item if they are found not required by the Agency during the course of the construction, or add new bid items or scope of work by Contract Change Order at any time during the project up to the last contract working day.

The BIDDER agrees to hold all unit prices in this Alternate Bid Schedule constant throughout the duration of the project up to the last contract working day.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

BID SCHEDULE SUMMARY
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
BIDDER NAME: Sully-Miller Contracting Company

BID SUMMARY
$

TOTAL PRICE IN
FIGURES 2,940,325.50

BASE BID

TOTAL PRICE IN TWO MILLION NINE HUNACO, FORTY THOSAND
WORDS THREE HUNDRED TWENTY-FINS DOnNeS
AND FIFTYCENTS.
$

TOTAL PRICE IN
FIGURES 565,853.40
ALTERNATE 1

TOTAL PRICE IN FIVE HUNDRED SIXTY-FIVE THOSANA
EIGHT HUNDRED FETY THeSE DOLLARS
WORDS AND CORTY tENTS
$
TOTAL PRICE IN 456,122.50

FIGURES
ALTERNATE 2
Fore HUNDRED FIFTY-SiX THOUSAND ONE

TOTAL PRICE IN HODRED TWENTY-TWO DOLLARS AND
WORDS FIFTY LENTS.
$

TOTAL PRICE IN
FIGURES 3, 962, 301.40
TOTAL BASE BID +
ALTERNATE 1 AND THESS MILLION NINE HUNDRED SIXTY-TOO
ALTERNATE 2

TOTAL PRICE IN HOUSAND THESE HUNDRSA ONE DOLLARS
WORDS AND FORTY CENTS.

NOTE: In case of error in extension of price into the total price column, the unit price will govern. The basis of award of contract shall be the Contractor's Base Bid plus the Alternates.

DocuSign Envelope ID: E93D61F8-0029.4AB9-83E0-B2ADB942F2B8 N/A

BIDDER'S BOND
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
! City of Santa Clarita, California
Proposals must be accompanied by a proposal guarantee consisting of a certified check, cashier's check or BIDDER's bid bond payable to the CITY or cash deposit in the amount not less than ten (10) percent of the total amount bid. Certified check, cashier's check or Bidder's bid bond must be received at City Hall, 23920 Valencia Blvd., Santa Clarita, CA 91355, Attn: Purchasing, Sulte 120, and marked with the words "BID BOND FOR" and the bid #, no later than the bid closing date and time, for the BIDDER to be considered responsive.

NOTE: The following form shall be used in case check accompanies bid.

Accompanying this Proposal is a *certified/cashier's check payable to the order of the City of Santa Clarita for: dollars ($_ _), this amount being not
less than ten percent (10%) of the total amount of the bid. The proceeds of this check shall become the property of said CITY provided this Proposal shall be accepted by said CITY through action of its legally constituted contracting authorities, and the undersigned shall fail to execute a contract and furnish the required bands within the stipulated time; otherwise, the check shall be returned to the undersigned.

Project Name: 2021-2022 Federal Resurfacing Project
Bid No. CIP-22-23-M0142
Project No. M0142
Bidder's Signature

CONTRACTOR/BIDDER
Address
City, State, Zip Code
* Delete the inapplicable work.

NOTE: if the bidder desires to use a bond instead of a check, the following form shall be executed.

The sum of this bond shall be not less than ten percent (10%) of the total amount of the bid.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

PROPOSAL GUARANTEE BID BOND
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
KNOW ALL PERSONS BY THESE PRESENTS that Sully-Miller Contracting Company → as BIDDER, and Liberty Mutual Insurance Company _as SURETY, are held and firmly bound unto the City of santa Clatta, as CITY, in the penal sum ofTen Percent of tars (stamount bj, which Is ten percent (10%) of the total amount bid by BIDDER to CITY for the above-stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to CITY for the above-stated project, if said bid is rejected, or if said bid is accepted and the contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of CITY.

IN WITNESS WHEREAS, the parties hereto have set their names, titles, hands, and seals, this in 22nd _Day of February 2023.

Name and Title of Signatory
_Sully-Miller Contracting Company
Legal Name of Bidder
135 S State College Blvd., Ste 400, Brea, CA 92821
Bidder Address
714-578-9655 33-0787630
Telephone Number Federal Tax I.D. No.

Liberty Mutual Insurance Company Untoria M. Carpell
SURETY*:

Name Victoria M. Campbell, Attorney-in-Fact
513-792-1862 [email protected]
Phone Number and Email
8044 Montgomery Rd., Ste 150E, Cincinnati, OH 45236
Address
*Provide BIDDER and SURETY name, phone number, email, and the name, title, address, and phone number for authorized representative. IMPORTANT - Surety Companies executing Bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the State where the project is located.

Contractor and Surety signatures must be notarized prior to submittal.

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A outer tale or the cotic and an it rites ace tear of the eld cure signed the State of California
County of Orange
On March 4, 2023 before me, _ J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared en cater
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose names) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

J. DANIELS
Notary Public - California
Orange County Signature Жбанив
Commission # 2377975
My Cornm. Expires Oct 9, 2025
J. Daniels, Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Proposal Guarantee Bid Bond
Title or Type of Document: Document Date: February 22, 2023 Number of Pages: 1 Signers) Other Than Named Above: _
Capacity(ies) Claimed by Signers)
Signer's Name: Jeff Galterio Signer's Name:

X Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Attorney in Fact • Individual • Attorney in Fact
• Guardian or Conservator • Guardian or Conservator
• Other: • Other:

Signer Is Representing: Signer Is Representing:

Sully-Miller Contracting Company
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange -
On FEB 2 2 2023 before me, _ L. Clark, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared Victoria M. Campbell
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

L. CLARK
Notary Public - California
Los Angeles County NNA 1 Signature
Commission #2336730
My Comm. Expires Nov 28, 2024 Signature of Notary Public Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Document Date: FEB 2 2 2023
Title or Type of Document: _
Number of Pages: Signers) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Signer's Name:
• Corporate Officer - Title(s): • Corporate Officer - Title(s): _ • Partner - • Limited • General • Partner - • Limited • General • Individual x Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: Signer Is Representing:
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 This Power of the Company ekeptis of manner and he the eatent hereins no authorily to Liberty
Liberty Mutual Insurance Company
Mutual® The Ohio Casualty Insurance Company Certificate No: 8205201-971932 West American Insurance Company
SURETY

POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Khoi Tran; Victoria M. Campbell
all of the city of Los Angeles. state of CA each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.

IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this day of April 2021
Liberty Mutual Insurance Company
INSURAN INSURANC The Ohio Casualty insurance Company
TU TUAL •CORPORATE "CORPORATE RICAN CORPORATED West American Insurance Company 1912 1919 1991
Hari?. Car

ANTONOR INDIANA
ISEM 1NVd By:

David M. Carey, Assistant Secretary
State of PENNSYLVANIA sS verification inquiries,
County of MONTGOMERY
before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance [email protected] On this Sth day of April 2021
Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes loan, letter of credit, therein contained by signing on behalf of the corporations by himself as a duly authorized officer.

IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.

Commonwealth of Pennsylvania - Notary Seal
currency rate, interest rate or residual value guarantees. Teresa Pastella, Notary Public Montgomery County Pastella
note, My commission expires March 28, 2025 By: enea
Commission number 1126044
Member, Pennsylvania Association of Notaries Teresa Pastella, Notary Public Power of Attomey

DOTARY FURLE
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance call 610-832-8240 or emai Not valid for mortgage ARTICLE IV - OFFICERS: Section 12. Power of Attorney.

Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President and/or may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attomey, shall have fuil pe as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or altomey-in-fact under the provisions of this please article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.

ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.

Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings. bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary.

Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys-in- fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations.

Authorization -By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed.
1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked.

IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 22nd _day of February _ 2023

INSURAN INSURANCE INSURANCE

CORPORATE MERICAN CORPORATE
1912 1919 1991 Kani cully
By:

LUSACHUSET INDIANA Renee C. Llewellyn, Assistant Secretary ANNA
LMS-12873 LMIC OCIC WAIC Multi Co 02/21
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

BIDDER'S INFORMATION AND CERTIFICATION
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, callfornia
Bidder certifies that the representations of the bid are true and correct and made under penalty of perjury.

EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE
Bidder certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any CITY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

AFFIRMATIVE ACTION CERTIFICATION
Bidder certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, Bidder certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents.

CERTIFICATION REGARDING DIR CONTRACTOR/SUBCONTRACTOR REGISTRATION By my signature hereunder, as the Contractor, I certify that Contractor, and all Subcontractors listed on the Subcontractor Designations form are the subject of current and active contractor registrations pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code. Contractor's registration number is indicated below. Subcontractors' registration numbers are indicated on the Subcontractor Designations form.

Bidder's Name: Sully-Miller Contracting Company
Business Address: 135 S. State College Blvd., Ste. 400, Brea, CA 92821 Telephone No.: 714/578-9600
State CONTRACTOR's License No. & Class: 747612-A
DIR No.: 1000003664
Original Date: December 10, 2014 Expiration Date: June 30,2024 The following are the names, titles, addresses, and phone numbers of all individuals, firm members, Parteade See Alached Cericate of incum encincipal interest in this proposal:

William J.T. Boyd, President
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Scott Bottomley, Vice President/Assistant Secretary
Christopher Winter, CFO/Treasurer/Vice President/Assistant Secretary Jeff Galterio, Assistant Secretary
The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal, or any firm, corporation, partnership or joint venture of which any principal having an interest in this proposal was an owner, corporate officer, partner or joint venture are as follows:

None
All current and prior DBAs, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows:

None
of all aforementioned principals this day ofFeb. 2023
BIDDER: Uf Salter's
Signature
Jeff Galterio, Assistant Secretary
Name and Title of Signatory
Sully-Miller Contracting Company
Legal Name of Bidder
135 S. State College Blvd., Ste. 400, Brea, CA 92821
Address
714/578-9600 33-0787630
Telephone Number Federal Tax I.D. No.

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 sococococococacacocacaacoraracarar ar ararararasarararararacararaaraararar rarorarasarara notary public or other officer completing this certificate verifies only the identity of the individual who signed th ocument to which this certificate is attached, and not the truthfulness, accuracy, or validity of that documen State of California
County of Orange
On March 4, 2023 before me, _ J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument. 1 certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official sealt
J. DANIELS
Notary Public - California
Orange County
Commission #2377975 Signature
My Comm. Expires Oct 9, 2025
J. Daniels, Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Bidder's Information & Certification Document Date: February 23, 2023 Number of Pages: _ 1 Signer(s) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:
* Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: Signer Is Representing:

Sully-Miller Contracting Company
xươ ươxư0000000000000000000000000008
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 SULLY-MILLER CONTRACTING CO.

License 747612A
135 S. State College Blvd., STE. 400 • Brea, CA 92821 • PHONE 714-578-9600 License Certificate
I certify under penalty of perjury under the laws of the State of California that the following is true and correct:

CSLB:
747612-A Jeff Galterio, Assistant Secretary
.. OR MIN
aca CONTRACTORS

STATE LICENSE BOARD

DEPARTMENT CE CONSUMER AFFAIRS ACTIVE LICENSE
License Number 747612 Entry CORP
Business Name SULLY - MILLER CONTRACTING

COMPANY
Classifications) A CSLB
-
Expiration Date 03/31/2024 www. csib.ca.gov
DIR State of California
Department of
EST. 1927 Industrial Relations
Contractor Information
Legal Entity Name

SULLY-MILLER CONTRACTING COMPANY
Legal Entity Type
Corporation
Status
Active
Registration Number
1000003664
Registration effective date
7/1/2022
Registration expiration date
6/30/2024
Mailing Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Physical Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Email Address
[email protected]
Trade Name/DBA
License Number (s)
CSLB -747612

CERTIFICATE OF INCUMBENCY AND RESOLUTION
1, Anthony L. Martino, II, do hereby certify that I am the Secretary of Sully-Miller Contracting Cord and mina roos of said corporatió as such I have acces to and custody of the corporate And I do hereby further certify that the following persons are duly elected officers of said corporation.

TITLE NAME
Chairman Of The Board Marcus Leavitt
President William Joseph Thomas Boyd
Vice President, CFO, Treasurer Christopher Winter
and Assistant Secretary
Vice President and Assistant Secretary Scott Bottomley
Secretary Anthony L. Martino, II
Assistant Secretary Jeff Galterio
Assistant Secretary Mark Pachura
I further certify that the following is a true and correct copy of a resolution duly adopted by the Board of Directors of said Company at a meeting held on December 15, 2022, and that this resolution has not been in any way rescinded, annulled, or revoked but the same is still in full force and effect:

BID TENDERS: GENERAL
RESOLVED, that any officer of the Corporation be and they hereby are authorized in the name and on behalf of the Corporation, under its corporate seal or otherwise (i) to prepare proposals and bids for the supplying of construction materials and the performance by itself or in joint venture, of work of whatsoever nature in connection with the construction or paving of highways, roads and airports and in connection with earthworks and civil engineering projects of all kinds, together with all work incidental thereto, (ii) to execute and submit any and all such proposals and bids to any governmental authority, instrumentality, or agency of the United States, its several states, territories and possessions, including without limitation, any municipality or other political or corporate subdivision thereof, and to any corporation, partnership, sole proprietorship, or other business entity, (ili) in connection with any such submission, to deliver bid deposits or bonds as may be required and (iv) to execute and deliver definitive agreements binding the Corporation to perform work in accordance with any proposals and bids authorized hereby.

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal this 28th day of February 2023.
220001
(SEAL)
Secretary
Sully-Miller Contracting Company
135 S. State College Blvd., Ste. 400
Brea, CA 92821
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

BIDDER'S QUESTIONNAIRE
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California

1. Submitted by: Sully-Miller Contracting Telephone: 714/578-9600 Principal ofice Adempany 135 S. State College Bvd. Ste. 400. Brea, CA 92821

2. Type of Firm:
* C Corporation
• S Corporation
Individual/Sole Proprietor or Single -Member LLC
Partnership
• Limited Liability Company "C" C-Corp
• Limited Liability Company "S" 5-Corp
• Limited Liability Company "p" Partnership
• Other
Зa. If a corporation, answer these questions:

Date of Incorporation: 06/16/1997_state of Incorporation. Delaware President's Name: William J.T. Boyd
Vice-President's Name: Scott Bottomley & Christopher Winter Secretary or Clerk's Name: Anthony L. Martino, I!
Treasurer's Name: Christopher Winter
3b. If a partnership, answer these questions:

Date of organization: _State Organized in:

Name of all partners holding more than a 10% Interest:

Designate which are General or Managing Partners.

CERTIFICATE OF INCUMBENCY AND RESOLUTION
I, Anthony L. Martino, II, do hereby certify that I am the Secretary of Sully-Miller Contracting Company, a Delaware corporation, and that as such I have access to and custody of the corporate records and minute books of said corporation.

And I do hereby further certify that the following persons are duly elected officers of said corporation.

TITLE NAME
Chairman Of The Board Marcus Leavitt
President William Joseph Thomas Boyd
Vice President, CFO, Treasurer Christopher Winter
and Assistant Secretary
Vice President and Assistant Secretary Scott Bottomley
Secretary Anthony L. Martino, II
Assistant Secretary Jeff Galterio
Assistant Secretary Mark Pachura
I further certify that the following is a true and correct copy of a resolution duly adopted by the Board of Directors of said Company at a meeting held on December 15, 2022, and that this resolution has not been in any way rescinded, annulled, or revoked but the same is still in full force and effect:

BID TENDERS: GENERAL
RESOLVED, that any officer of the Corporation be and they hereby are authorized in the name and on behalf of the Corporation, under its corporate seal or otherwise (i) to prepare proposals and bids for the supplying of construction materials and the performance by itself or in joint venture, of work of whatsoever nature in connection with the construction or paving of highways, roads and airports and in connection with earthworks and civil engineering projects of all kinds, together with all work incidental thereto, (ii) to execute and submit any and all such proposals and bids to any governmental authority, instrumentality, or agency of the United States, its several states, territories and possessions, including without limitation, any municipality or other political or corporate subdivision thereof, and to any corporation, partnership, sole proprietorship, or other business entity, (ill) in connection with any such submission, to deliver bid deposits or bonds as may be required and (iv) to execute and deliver definitive agreements binding the Corporation to perform work in accordance with any proposals and bids authorized hereby.

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal this 28th day of February 2023.
12001
(SEAL) Anthony L. Martino, II
Secretary
Sully-Miller Contracting Company
135 S. State College Blvd., Ste. 400
Brea, CA 92821
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 BIDDER'S QUESTIONNAIRE (cont'd)
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California

4. Name of person holding CONTRACTOR's license: William J.T. Boyd, President License number: 714612 class: A _Expiration Date: March 31, 2024 DIR. Registration # 1000003664

5. CONTRACTOR'S Representative: Anthony Lino
Title: Pre-Construction Manager
Alternate: Jeff Galterio
Title: Assistant Secretary

6. List the major construction projects your organization has in progress as of this date:

A.

Owner: **Please See Attached List of Project References** Project Location: _
Type of Project:

B.

Owner: _
Project Location:_
Type of Project:

C.

Owner:

Project Location:

Type of Project:

SULLY-MILLER CONTRACTING CO.

License 747612A
135 S. State College Blvd., STE. 400 • Brea, CA 92821 • PHONE 714-578-9600 License Certificate
I certify under penalty of perjury under the laws of the State of California that the following is true and correct:

CSLB: Walters
747612-A Jeff Galterio, Assistant Secretary
dca CONTRACTORS

STATE LICENSE BOARD

DEPAATMENT CI CONSUMER AFFAIRS ACTIVE LICENSE
License Number 747612 Entity CORP
Business Name SULLY - MILLER CONTRACTING

COMPANY
Classification(s) A CSLB
Expiration Date 03/31/2024 www. csib.ca.gov ào o
MIR • State of Calitornia
Department of
EST. 1927 Industrial Relations
Contractor Information
Legal Entity Name

SULLY-MILLER CONTRACTING COMPANY
Legal Entity Type
Corporation
Status
Active
Registration Number
1000003664
Registration effective date
7/1/2022
Registration expiration date
6/30/2024
Mailing Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Physical Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Email Address
[email protected]
Trade Name/DBA
License Number (s)
CSLB -747612
Project
Experience
/m

SULLY -MILLER
CONTRACTING Co.

A COLAS COMPANY
NOVEMBER 19
Sully-Miller Contracting Co.
135 S. State College Blvd., Suite 400
Brea, CA 92821

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANT
Construction on State Highway Route 15 from Oak
Project Full Name > Hill Rd. to Bear Valley Rd Route 210 ADA Curb Ramp Upgrade Project LA County from the Sunland Blvd. crossing
Project Location San Bernardino County CA (Tujunga CA) to Baseline Rd. crossing (Upland CA)
Project Owner CALTRANS CALTRANS
Contact Name John Santos John Santos
Contact Role/
Position Project Manager Project Manager
Telephone (951) 538 - 5315 (951) 538 - 5315
Email [email protected] [email protected]
Reaching a project boundary length of almost ten
This 23-million-dollar project wasn't just a "run of
miles, the amount of unique worked that is
required by this project is on an immense scale. the mill" construction project, this project was a The scope of work consists of scheduling; design-build project that required all of the curb ramps on the on/off ramps and frontage roads
mobilization and demobilization; traffic control;
temporary barricade and fencing placement; along the 210 freeway to be reconstructed to temporary and permanent striping/marking; comply with current ADA standard codes. The temporary crash cushion installation; landscaping project limits extended a total of approximately 41 that included clear and grubbing, roadside miles that begun 1.4 miles west of the Sunland clearing and over two million square feet of Boulevard undercrossing and ended just 0.1 miles Facility Information Project east of the Baseline Road undercrossing. The Description hydroseeding; over 110,000 cubic yards of
aggregate base placement; cold milling; HMA projects scope of work consisted of upgrading 264 ADA curb ramps, installation of accessible
application; concrete work which included
pedestrian signal systems, and the installation of
flatwork, curb and gutters, and sidewalks;
striping/marking; electrical work that involved pedestrian countdown timers. This project, due to signal construction, ramp metering construction, its vast length along the 41 mile stretch of the 210 and lighting system installation; as well as a freeway, creates unique challenges that are considerable amount of underground work such currently being overcome by the Sully-Miller team's resilience and desire to challenge the
as pipe culvert construction, pipe and down drain ordinary. construction, and pipe liner application.

Start Date November 2021 January 2022
Project Duration
End Date Est. December 2024 Est. January 2024
Cost Contract Amount $ 121,672,000 $ 23,680,000
Sully-Miller Contracting Company | 135S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANT
Chesapeake
19982019 10:49:47
2020 Pavement Overlay and Resurfacing Spring Valley Lake ADA Ramps and Various Roads Project Full Name > Overlay Project
Program
Project Thousand Oaks, CA Spring Valley Lake, CA
Location
Project Owner City of Thousand Oaks County of San Bernardino Contact Name Michelle McCarty Joseph Schweitzer
Contact Role/
Position Project Manager Supervising Engineer
Telephone (805) 449 - 2477 (909) 387 - 7936
Email [email protected] [email protected] This almost $13 million dollar job was for
Thousand Oaks' annual pavement rehabilitation
program. This project's boundaries covered an The Spring Valley Lake project was a vast-scale extremely large area, just over 63 square miles, project that required the cold milling and re-paving which presented a unique challenge for overall of over 120 separate locations within a 2.25 square mile project boundary. The project's scope
ne apart and rubbered hol of work included minor concrete work (such as Facility Information Project ADA curb ramp, curb and gutter, spandrel, Description
paving, but also included an enormous amount of driveway and retaining curb construction), cold milling over 2,000,000 square feet worth),
square feet), the removal and replacement of over grading, placing asphalt concrete (including 200 curb ramps, over 8,000,000 square feet of asphalt rubberized hot mix), utility adjustment and crack application, a large quantity of striping/marking work. microsurfacing/slurry seal, utility adjusting,
striping/marking and some.

Start Date May 2020 September 2019
Project Duration
End Date December 2020 April 2020
Cost Contract Amount $ 12,995,708 $ 12,448,000
Sully-Miller Contracting Company | 135 State College Boulevard, Suite 400 | Brea, CA92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY -MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
LA County Sheriff's Department Emergency Annual Residential Street Rehabilitation Project Project Full Name >
Vehicle Operations Center Phase 2A
Project
Location Castaic, CA Compton, CA
Project Owner Los Angeles County Department of Public Works City of Compton Contact Name Victorio Monteil John Strickland
Contact Role/
Project Manager Project Manager
Position
Telephone (626) 300 - 3267 (310) 605 - 5505
Email [email protected] [email protected] This project consists of the design and
construction of a Sheriff's Department Emergency
Vehicle Operation Center (EVOC) which will be
used to train Sheriff's personnel on safe operation
of vehicles operated at high speed and on normal
city streets. It includes a 5,000 square foot Stretching over seven miles in three separate locations, the second phase of Compton's
classroom building with offices, locker rooms,
storage, a kitchenette, and restroom facilities, a 44 reconstruction project was completed with a heavy amount of materials and man-power. The scope of
acre high-speed track, with pursuit track area, a work for this job encompassed cold milling and Project skid pan for training personnel on how to operate Facility Information pavement overlay, base application, full depth Description vehicles in slippery road conditions and a collision reconstruction, concrete construction (curb and
avoidance track to practice avoiding other vehicle
or objects in emergency situations. There is also gutter, sidewalks, driveways, cross gutters, alley a training vehicle parking lot, as well as a separate intersections, and curb ramps), pavement employee and class attendee parking lot. The striping/marking, utility adjusting and traffic loop itemized scope of work includes the design and installation. construction of grading, base and asphalt
concrete construction, civil construction work,
structural work, electrical, underground fire/water
system construction, demolition and landscaping
Start Date March 2020 October 2021
Project Duration
End Date February 2022 Est. July 2022
Cost Contract Amount $ 10,790,000 $ 6,465,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
Project Full Name > 2020 Spring Pavement Management Program 2018-19 Overlay Project A Project Location Lancaster, CA Santa Clarita, CA
Project Owner City of Lancaster City of Santa Clarita
Contact Name Vickie Zhao Julia Regan
Contact Role/
Position Assistant Engineer Project Manager
Telephone (661) 945 - 6869 (661) 255 - 4301
Email [email protected] [email protected] Totaling to a distance of over four miles, this
project not only included the rehabilitation of
almost a one-mile portion of two-lane arterials, but
also encompassed the reconstruction of over three With a proposal plan of a base bid and seven miles of 10th Street West in Lancaster CA, which is alternates, the shear breadth of the Santa Clarita annual overlay project had its initial challenging
one of Lancaster's largest arterial roadways.

Sitting at six lanes wide, the reconstruction called elements. Not only did the scope of work include Facility Information Project general key-cut grinding, cold planning and overlay Description for a mass amount of hot mix asphalt concrete, over 12,000 tons, and asphalt rubber hot mix of various hot mix asphalts, but there was also a significant amount of full depth removal and
concrete, over 13,000 tons. However, this project
did not only include the planning and paving of replace, as well as utility adjusting, traffic loop asphalt, the scope of work also included curb ramp installation, striping/marking and some minor concrete work.
reconstruction, minor electrical work, slurry seal
application, aggregate base application, and
signing, striping, and marking.

Start Date September 2020 July 2019
Project Duration
End Date December 2020 December 2019
Cost Contract Amount $ 6,252,000 $ 4,480,399
Sully-Miller Contracting Company | 135 State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
Pavement Rehabilitation at Various Locations -
Project Full Name > Greenstone Avenue Street Improvements Street, Water, and Sewer Improvements
Project Lynwood, CA Santa Fe Springs, CA
Location
Project Owner City of Lynwood City of Santa Fe Springs
Contact Name Noe Martinez Robert Garcia
Contact Role/
Position Public Works Assistant Associate Civil Engineer Telephone (310) 603 - 0220 (562) 868 - 0511
Email [email protected] [email protected] At just over a mile long and exiting in a location
within a heavy industry district in Santa Fe Springs,
With a job location spanning over five square miles
Greenstone Avenue needed an overhaul to say
in six different unique locations, this project proved
the least. The full scope of work included with this
to have challenging aspects not only from its
project was cold milling of asphalt concrete,
location, but also with its broad scope of work. This applying a new layer of asphalt rubber hot mix job included level work such as street resurfacing, asphalt, application of roller compacted concrete, Project various types of concrete work, traffic signing and utility adjustment, signing, striping and the Description striping; as well as underground work at the construction of PCC curb and gutters, curb ramps,
various locations, which incorporated sanitary driveways, cross gutters and sidewalks. The city of sewer system repairs (with CIPP lining), new Santa Fe Springs provided an offsite (yet close to water mainline installation including the service
the jobsite lot that contained a mobile asphalt
laterals, smart metes, fire hydrants and
plant to induct and mix the materials needed for
appurtenances. the roller compacted concrete, which was then transported to the job site.

Start Date October 2020 June 2019
End Date February 2021 January 2020
Cost Contract Amount $ 3,468,000 $ 3,444,361
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY-MILLER
CONTRACTING Co. Project Experience
71OK
Project Full Name > Prairie Avenue Improvements Sherman Way Streetscape Improvements Project Location Inglewood, CA Reseda, CA
Project Owner City of Inglewood City of Los Angeles
Contact Name Hunter Nguyen Courtney Luc
Contact Role/
Associate Engineer Project Manager
Position
Telephone (310) 412 - 5333 (213) 847 - 2354
Email [email protected] [email protected] Located directly off of Prairie Avenue sits the At just under a mile, this four lane arterial required Forum, an iconic entertainment venue, and the (at more than just a standard grind and overlay. On the time) currently under construction Sofi top of the cold planning, hot mix asphalt Stadium. Both of which bring heavy traffic to this placement, base application and minor concrete two mile stretch of a six lane arterial. The scope of work, this job's scope of work also included, traffic Project work for this improvement project included signal construction/relocation, minor electrical Description surveying, traffic control, over 500,000 square feet work, utility adjustment and a large amount of of cold planning, construction of hot mix asphalt beautification work. The beautification work and asphalt rubber hot mix, placement of base encompassed the construction of tree wells, tree material, almost 1000 cubic yards worth of planting, mulch placement, top soil furnishing, concrete improvements, utility adjustment, almost 10,000 square feet of landscaping and the signing, striping, and traffic loop restoration. application of cobblestone.

Start Date February 2020 April 2020
Project
End Date July 2020 May 2021
Cost Contract Amount $ 3,258,000 $ 2,623,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY

OLD TOWN
BARON
Pedestrian Path Improvements at Various
Project Full Name > 2021 Arterial Street Overlay
Locations in Boron and Desert Lake
Project
Location Boron, CA Palmdale, CA
Project Owner County of Kern City of Palmdale
Contact Name Michelle Burns-Lusich Marc Zuber
Contact Role/
Position Public Works Manager Public Works Project Manager Telephone (661) 882 - 8861 (661) 267 - 5300
Email [email protected] [email protected] To preserve the historical significance of the
Twenty Mule Team Road, where a majority of the
work for this project had been done, constructing
and/or reconstructing the pedestrian pathways
and the asphalt of the road itself was completed This project called for a mass amount of pavement with much care and respect. Adding up to almost to be cold planed and repaved, over one million square feet, and required a polymer modified
four miles in distance, the job itself had notable
Facility Information Project asphalt concrete instead of conventional hot mix concrete and asphalt quantities for a two-lane
Description asphalt or rubberized hot mix asphalt. This project road, consisting of over 1000 cubic yards of also included surveying, striping, marking, utility Portland cement concrete and over 5000 tons of
adjusting, and traffic control within its scope of
asphalt cement. The complete scope of work for work.
this project included constructing Class 1 bike
paths, multi-use paths, sidewalks, curbs, gutters,
curb ramps, drive approaches and paving hot mix
asphalt concrete.

Start Date May 2020 July 2021
Project Duration
End Date November 2020 August 2021
Cost Contract Amount $2,536,331 $ 2,067,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

CERTIFICATION OF NON-SEGREGATED FACILITIES
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
The BIDDER certifies that it does not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not permit its employees to perform their services at any location, Opportunity clause in this Contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, rest rooms, and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. The BIDDER agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) it will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that it will retain such certifications in its files.

Clatters
Sully-Miller Contracting Company
BIDDER Jeff Galterio, Assistant Secretary
Required by the May 19, 1967 order on Elimination of Segregated Facilities, by the Secretary of Labor - 32 F.R. 7439, May 19, 1967 (F.R. Vol. 33, No. 33 - Friday, February 16, 1968 - p. 3065).

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

BUY AMERICA CERTIFICATION
(STEEL OR MANUFACTURED PRODUCTS)
[61 FR 6302, Feb. 16, 1996, as amended at 74 FR 30239, June 25, 2009] Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
General Requirement (as stated in 49 CFR 661.5)
Except as provided in 49 FR 661.7 and 49 CFR 661.11, no funds may be obligated by FTA for a grantee project unless all Iron, steel, and manufactured products used in the project are produced in the United States.

All steel and iron manufacturing processes must take place in the United States, except metallurgical processes involving refinement of steel additives. (c) The steel and iron requirements apply to all construction materials made primarily of steel or iron and products or rolling stock, or to bimetallic power rail incorporating steel or iron components. (d) For a manufactured product to be considered produced in the United States:
(1) All of the manufacturing processes for the product must take place in the United States; and
All of the components of the product must be of U.S. origin. A component is considered of u.s. origin if it is manufactured in the United States, regardless of the origin of its subcomponents.

If steel, iron, or manufactured products (as defined in 49 FR 661,3 and 661.5) are being procured, the appropriate certificate as set forth below shall be completed and submitted by each bidder or offeror in accordance with the requirement contained in 49 CFR 661.13(b).

Certificate of COMPLIANCE with Buy America Requirements.

The bidder or offeror hereby certifies that it will comply with the requirements of 49 U.S.C. 5323(j)(1), and the applicable regulations in 49 CFR part 661.

Company. Sully-Miller Contracting Company
Name Jeff Galterio _Title Assistant Secretary
UffSalters Date_February 23, 2023
Signature
Certificate of NON-COMPLIANCE with Buy America Steel or Manufactured Products Requirements The bidder or offeror hereby certifies that it cannot comply with the requirements of 49 U.S.C. 5323(i), but it may quailfy for an exception to the requirement pursuant to 49 U.S.C. 5323()(2), as amended, and the applicable • regulations in 49 C.F. R. 661 7
Company
Name Title
Signature _Date
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

CERTIFICATION OF NON-SEGREGATED FACILITIES
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
The BIDDER certifies that it does not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The BIDDER certifies further that it will not naintaln or provide for its employees any segregated facilities at any of its establishments, and that it will not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The BIDDER agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, rest rooms, and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. The BIDDER agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) it will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that it will retain such certifications in its files.

Sully-Miller Contracting Company
BIDDER Jeff Galterio, Assistant Secretary
Required by the May 19, 1967 order on Elimination of Segregated Facilities, by the Secretary of Labor- 32 F.R. 7439, May 19, 1967 (F.R. Vol. 33, No. 33 - Friday, February 16, 1968 - p. 3065).

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

DESIGNATION OF SUBCONTRACTORS
Bid # CIP-22-23-MD142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
lated nor se the nara parent, or 00 ice or greate race price content or a Bid old at age prim an a l are rada. re required if sub-contractor is participating as a DBE. If no Subcontractors will be used fill out the form with NA. Add addt. sheets if needec Subcontractor DIR Registration No.* Dollar Value of Work PC\ 1000813536 272, 440
Age of firm: Annual Gross Receipts:

DBE: Yes NO
15+ Tears Certifying Agency: _ #5 000,000 +
Location and Place of Business
975 w. 1St st AZUSA, CA, 91702
Bid Schedule Item No's: Description of Work
15-31 BASE BID
License No. Exp. Date: Phone ( )
415490 562) 218-0508
Subcontractor DIR Registration No.* Dollar Value of Work 1000008423 $50,000
Age of firm: Annual Gross Receipts:

DBE: Yes
15 years Certifying Agency: 40088 410,000, 000 +
Location and Place of Business
Bid Schedule lem No's: M our testator 625 Ave, la Mabra, dA 90631 Description of Work
vARIous support
sweeling
License No. Exp. Date: Phone ( )
754500 562) 627-2286
Subcontractor DIR Registration No.* Dollar Value of Work Traffic loops Crackfilling 1000003794 - 204,17508
Age of firm: Annual Gross Receipts:
+ Tears Certifying Agency: 38033 155,000,000 +
Location and Place of Business
94 Emers
Ancheim, CA, 92804
ALT 1 Bid Schedule Item No's: Description of Work
24,33 32-38 DASE BID VDS
License No. Exp. Date: Phone ( )
кгт 2 652956

23.24 +141520-4024
NOTE: A BIDDER or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered BIDDER to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the BIDDER is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. *Pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

DESIGNATION OF SUBCONTRACTORS
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
Subcontractor DIR Registration No.* Dollar Value of Work EBS 1000004286 $ 34,000
Age of firm: DBE: Yes NO Annual Gross Receipts:
20 Certifying Agency: Snil - 0 -il
Location and Place of Business
Corona, CA 1345 Quarry St. * lO1
Bid Schedule Item No's: Description of Work
13-14,50-51, 72-73 Adjusting Utilibies
License No. Exp. Date: 5 /31 / 2023 Phone ( )
932798
951-279-6869
Subcontractor DIR Registration No.* Dollar Value of Work Pavement Reykling Systems 1000003363 $ 271,70 d
Age of firm: DBE: Yes No Annual Gross Receipts:
20 Certifying Agency: 1S mil t
Location and Place of Business
10240 Son Sevaine Way, Jumps Valley, CA 91752
Bid Schedule Item No's: Description of Work
19, "-R Mitig
License No. Exp. Date: / / Phone (
569352 951-682-1091
Subcontractor DIR Registration No.* Dollar Value of Work DC Traffic Control 1000039211 852000°°
Age of firm: Annual Gross Receipts:
+ DBE:
years Certifying Agency: 5.000,000
Location and Place of Business
13905 Artesia Blvd •Cerritos, CA, 90703
Bid Schedule Item No's: Description of Work
2 137, 62 (ontrol (partial)
Traffic,
License No. Exp. Date: Phone ()
1015478
NOTE: A BIDDER or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered BIDDER to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the BIDDER is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. *Pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
EXHABIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES
COMPLETE THIS FORM TO DISCLOSE LOBBYING ACTIVITIES PURSUANT TO 31 U.S.C. 1352

1. Type of Federal Action: 2. Status of Federal Action: 3. Report Type:
a. contract a. bid/offcr/application a. initial
b. grant b. initial award b. material change
d. operative agreement c. post-award
For Material Change Only:
e. loan guarantee year quarter
f. loan insurance dare of last report

4. Name and Address of Reporting Entity 5. If Reporting Entity in No. 4 is Suhawardee Enter Name and Address of Prime:

Prime subawardee
Tier _, if known
N/A
Congressional District, if known Congressional District, if known б. Federal Department/Agency: 7. Federal Program Name/Description:

CFDA Number, if applicable

8. Federal Action Number, if known: 9. Award Amount, if known:

10. Name and Address of Lobby Entity 11. Individuals Performing Services (If individual, last name, first name, MI) (including address if different from No. 10) (last name, first name, MI
(attach Continuation Sheets) if necessary)
Amount of Payment (check all that apply) 14. Type of Payment (check all that apply) actual ] planned a. retainer
b. one-time fee

13. Form of Payment (check all that apply): c. commission a. cash d. contingent fee
b. in-kind; specify: nature a deferred
Value f. other, specify

15. (attach Continuation Sheet (s) if necessary)

16. Continuation Sheets) attached: Yes •
Print Name: Jeff Galterio
Title: Assistant Secretary
Telephone No.: 714/578-9600 Date: 02/23/23
Authorized for Local Reproduction
Federal Use Only: Standard Form - LLL
Standard Form LLL Rev. 04-28-06
Distribution: Orig- Local Agency Project Files

Page 1 ends

LPP 13-01 May 8, 2013
DocuSign Envelope ID: E93D81F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual EXHBIT 10-Q
Disclosure of Lobbying Activities
INSTRUCTIONS FOR COMPLETING EXHIBIT 10-Q DISCLOSURE OF LOBBYING ACTIVITIES This disclosure form shall be completed by the reporting entity, whether subawardee or prime federal recipient at the initiation or receipt of covered federal action or a material change to previous filing pursuant to title 31 U.S.C. Section 1352.

The filing of a form is required for such payment or agreement to make payment to lobbying entity for influencing or tempting to influence an officer or employee of any agency, a Member of Congress an officer or employee of Congress o n employee of a Member of Congress in connection with a covered federal action. Attach a continuation sheet for addition information if the space on the form is inadequate. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information.

1. Identify the type of covered federal action for which lobbying activity is or has been secured to influence, the outcome of a covered federal action.

2. Identify the status of the covered federal action.

3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred, Enter the date of the last, previously submitted report by this reporting entity for this covered federal action.

4. Enter the full name, address, city, state, and zip code of the reporting entity. Include Congressional District if known, Check the appropriate classification of the roporting entity that designates if it is or expects to bo a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the first tier. Subawards include but arc not limited to:
subcontracts, subgrants, and contract awards under grants.

5. If the organization filing the report in Item 4 checks "Subawardes" then enter the full name, address, city, state, and zip code of the prime federal recipient. Include Congressional District, if known.

6. Enter the name of the federal agency making the award or loan commitment. Include at least one organization level below agency name, if known. For example, Department of Transportation, United States Coast Guard,

7. Enter the federal program name or description for the covered federal action (item I). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, coopcrative agreements, loans and loan commitments.

8. Enter the most appropriate federal identifying number available for the federal action identification in item 1 (c.g., Request for Proposal (RFP) number, Invitation for Bid (LFB) number, grant announcement number, the contract grant, or loan award number, the application/proposal control number assigned by the federal agency). Include prefixes, e.g, "RFP-DE-90-001." For a covered federal action where there has been an award or loan commitment by the Pederal agency, enter the federal amoun of the award/loan commitments for the prime entity identified in item 4 or 5

10. Enter the full name, address, city, state, and zip code of the lobbying entity engaged hy the reporting entity identified in Item 4 to influenco the covered federal action.

11. Enter the full names of the individual(s) perforning services and include full address if different from 10 (a). Enter Last Name, First Name and Middle Initial (MI).

12. Enter the amount of compensation paid or reasonably expected to be paid by the reporting entity (Item 4) to the lobbying entity [Item 10). Indicate whether the payment has been made (actual) or will be made (planned). Check all boxes that apply. If this i a material change report, enter the cumulative amount of payment made or planned to be made.

13. Check all boxes that apply. If payment is made through an in-kind contribution, specify the nature and valuc of the in-kind

14. Check all boxes that apply. If other, specify nature.

15. Provide a specific and detailed description of the services that the lobbyist has performed or will be expected to perform and the date(s) of any services rendered. Include all preparatory and related activity not just time spent in actual contact with federal officials. Identify the federal officers) or employee(s) contacted or the officers) employee(s) or Member(s) of Congress that were contacted.

16. Check whether or not a continuation sheets) is attached.

17. The certifying official shall sign and date the form, and print his/her name title and telephone number.

Public reporting burden for this collection of information is cstimated to average 30-minutes per response, including time for reviewin nstruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, D.C. 20503. SF- LLL-Instructions Rev. 06-04

Page 2 ends

LPP 13-01 May 8, 2013
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
Sully-Miller
This bidder Contracting Companyroposed subcontractor*********************** hereby certifies Federal Government contracting or administering AGENCY, or the former President's Committee on Equal Employment Opportunity, all reports that are under the applicable filing requirements.

Company: Sully-Miller Contracting Company
By: Uff Saltera
Title: Jeff Galterio, Assistant Secretary
Date: February 23, 2023
The above certification is required by the Equal Employment Opportunity of the Secretary of Labor (41 CFR 60-1.7(b)(1)) and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause as set forth in 41 CFR 60-1.5, (Generally only contracts or subcontracts of $10,000 or under are exempt.) Currently, the Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.

Proposed prime CONTRACTORS/BIDDER and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b)(1) prevents the award of contracts and subcontracts unless such BIDDER submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S. Department of Labor.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

PROPOSAL FORM
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
TO THE CITY OF SANTA CLARITA, AS CITY:

In accordance with CITY's NOTICE INVITING BIDS, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated project as set forth in the plans, specifications, and contract documents therefore, and to perform all work in the manner and time prescribed therein.

BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, INSTRUCTIONS TO BIDDERS, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with CITY at the unit and/or lump sum prices set forth in the following BID SCHEDULE. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to CITY of the proposal guarantee accompanying this proposal.

BIDDER understands that a bid is required for the entire work that the estimated quantitles set forth in BID SCHEDULE are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum price(s) bid include all appurtenant expenses, taxes, royalties, and fees for the project's duration. in case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures.

If awarded the contract, the undersigned further agrees that in the event of the Bidder's default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the CITY's notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the CITY and this bid and the acceptance hereof may, at the CITY's option, be considered null and void.

Company Name: Sully-Miller Contracting Company
Company Address: 135 S. State College Blvd., Ste. 400
Brea, CA 92821
Phone: 714/578-9600
Email: [email protected]
By: Jeff Galterio
Print Name
Title: Assistant Secretary
Walterio
Signature:

Date: February 23, 2023
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 socceronasarasadoracocoa adoradaaaaaaaaaaaara anacocara cacocarasadoracocoacati A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document State of California
County of Orange
Onl March 4, 2023 before me, - J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

J. DANIELS
Notary Public - California
Orange County
Commission #2377975 Signature
My Comm. Expires Oct 9, 2025 Signature of Notary Public J. Daniels, Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Bid Proposal-Signature Page Document Date: February 23, 2023 Number of Pages: 1 Signers) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:
* Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:
igner is Representing Signer Is Representing:

Sully-Miller Contracting Company
xxxxxxxxxxxx 0000000,00,000,000ccucuuu cuca
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 :

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

REFERENCES
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
The following are the names, addresses, and telephone numbers of three public agencies for which bidder has performed and completed work of a similar scope and size within the past 3 years. If the scope of work/specifications requests references different than instructions above, the scope of work/specifications ane ase res tached Aist of Project References*.

Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed
Name and Address of Owner / Agency
Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed

3. Name and Address of Owner / Agency
Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed
he following are the names, addresses, and telephone numbers of all brokers and sureties from who bidder intends to procure insurance bonds: _ Please See Attached List of Sureties Project
Experience

SULLY- MILLER
CONTRACTING Co.

A COLAS COMPANY
LONEL
NOVEMBER 19
Sully-Miller Contracting Co.
135 S. State College Blvd., Suite 400
Brea, CA 92821

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
Construction on State Highway Route 15 from Oak
Project Full Name > Route 210 ADA Curb Ramp Upgrade Project Hill Rd. to Bear Valley Rd.

LA County from the Sunland Blvd. crossing
Project Location San Bernardino County CA (Tujunga CA) to Baseline Rd. crossing (Upland CA)
Project Owner CALTRANS CALTRANS
Contact Name John Santos John Santos
Contact Role/
Position Project Manager Project Manager
Telephone (951) 538 - 5315 (951) 538 - 5315
Email [email protected] [email protected]
Reaching a project boundary length of almost ten This 23-million-dollar project wasn't just a "run of miles, the amount of unique worked that is the mill" construction project, this project was a required by this project is on an immense scale.
design-build project that required all of the curb
The scope of work consists of scheduling;
ramps on the on/off ramps and frontage roads
mobilization and demobilization; traffic control;
along the 210 freeway to be reconstructed to
temporary barricade and fencing placement;
temporary and permanent striping/marking; comply with current ADA standard codes. The project limits extended a total of approximately 41
temporary crash cushion installation; landscaping
miles that beaun 1.4 miles west of the Sunland
that included clear and grubbing, roadside
Boulevard undercrossing and ended just 0.1 miles
Facility Information Project clearing and over two million square feet of east of the Baseline Road undercrossing. The Description hydroseeding; over 110,000 cubic yards of
aggregate base placement; cold milling; HMA projects scope of work consisted of upgrading 264 ADA curb ramps, installation of accessible
application; concrete work which included
pedestrian signal systems, and the installation of
flatwork, curb and gutters, and sidewalks;
pedestrian countdown timers. This project, due to
striping/marking; electrical work that involved its vast length along the 41 mile stretch of the 210 signal construction, ramp metering construction,
freeway, creates unique challenges that are
and lighting system installation; as well as a
currently being overcome by the Sully-Miller
considerable amount of underground work such
team's resilience and desire to challenge the
as pipe culvert construction, pipe and down drain
ordinary.
construction, and pipe liner application.

Start Date November 2021 January 2022
Project Duration
End Date Est. December 2024 Est. January 2024
Cost Contract Amount $ 121,672,000 $ 23,680,000
Sully-Miller Contracting Company | 135SState College Boulevard, Suite 400 | Brea, CA92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
92019 10:4347
2020 Pavement Overlay and Resurfacing Spring Valley Lake ADA Ramps and Various Roads Project Full Name >
Program Overlay Project
Project
Location Thousand Oaks, CA Spring Valley Lake, CA
Project Owner City of Thousand Oaks County of San Bernardino Contact Name Michelle McCarty Joseph Schweitzer
Contact Role/
Project Manager Supervising Engineer
Position
Telephone (805) 449 - 2477 (909) 387 - 7936
Email [email protected] [email protected] This almost $13 million dollar job was for
Thousand Oaks' annual pavement rehabilitation
program. This project's boundaries covered an The Spring Valley Lake project was a vast-scale extremely large area, just over 63 square miles, project that required the cold milling and re-paving which presented a unique challenge for overall of over 120 separate locations within a 2.25 construction planning. The scope of work for this square mile project boundary. The project's scope project covered a majority of cold milling and hot of work included minor concrete work (such as Facility Information Project mix asphalt and rubberized hot mix asphalt ADA curb ramp, curb and gutter, spandrel, Description
paving, but also included an enormous amount of driveway and retaining curb construction), cold full section removal and replace (almost 142,000 milling (over 2,000,000 square feet worth), square feet), the removal and replacement of over grading, placing asphalt concrete (including 200 curb ramps, over 8,000,000 square feet of asphalt rubberized hot mix), utility adjustment an crack seal application, a large quantity of striping/marking work microsurfacing/slurry seal, utility adjusting,
striping/marking and some.

Start Date May 2020 September 2019
Project Duration
End Date December 2020 April 2020
Cost Contract Amount $ 12,995,708 $ 12,448,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
LA County Sheriff's Department Emergency Annual Residential Street Rehabilitation Project Project Full Name > Vehicle Operations Center Phase 2A
Project Castaic, CA Compton, CA
Location
Project Owner Los Angeles County Department of Public Works City of Compton Contact Name Victorio Monteil John Strickland
Contact Role/
Position Project Manager Project Manager
Telephone (626) 300 - 3267 (310) 605 - 5505
Email [email protected] [email protected] This project consists of the design and
construction of a Sheriff's Department Emergency
Vehicle Operation Center (EVOC) which will be
used to train Sheriff's personnel on safe operation
of vehicles operated at high speed and on normal
Stretching over seven miles in three separate
city streets. It includes a 5,000 square foot locations, the second phase of Compton's
classroom building with offices, locker rooms, reconstruction project was completed with a heavy storage, a kitchenette, and restroom facilities, a 44 amount of materials and man-power. The scope of acre high-speed track, with pursuit track area, a work for this job encompassed cold milling and Project skid pan for training personnel on how to operate Facility Information Description pavement overlay, base application, full depth vehicles in slippery road conditions and a collision
reconstruction, concrete construction (curb and
avoidance track to practice avoiding other vehicle
or objects in emergency situations. There is also gutter, sidewalks, driveways, cross gutters, alley intersections, and curb , ramps), pavement
a training vehicle parking lot, as well as a separate
striping/marking, utility adjusting and traffic loop
employee and class attendee parking lot. The installation itemized scope of work includes the design and
construction of grading, base asphalt
concrete construction, civil construction work,
structural work, electrical, underground fire/water
system construction, demolition and landscaping.

Start Date March 2020 October 2021
Project Duration
End Date February 2022 Est. July 2022
Cost Contract Amount $ 10,790,000 $ 6,465,000
Sully-Miller Contracting Company | 135 State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
Project Full Name > 2020 Spring Pavement Management Program 2018-19 Overlay Project A Project Location Lancaster, CA Santa Clarita, CA
Project Owner City of Lancaster City of Santa Clarita
Contact Name Vickie Zhao Julia Regan
Contact Role/ Project Manager
Position Assistant Engineer
Telephone (661) 945 - 6869 (661) 255 - 4301
Email [email protected] [email protected] Totaling to a distance of over four miles, this
project not only included the rehabilitation of
almost a one-mile portion of two-lane arterials, but
With a proposal plan of a base bid and seven
also encompassed the reconstruction of over three
miles of 10th Street West in Lancaster CA, which is alternates, the shear breadth of the Santa Clarita annual overlay project had its initial challenging
one of Lancaster's largest arterial roadways. elements. Not only did the scope of work include Sitting at six lanes wide, the reconstruction called general key-cut grinding, cold planning and overlay Facility Information Project
Description for a mass amount of hot mix asphalt concrete, of various hot mix asphalts, but there was also a over 12,000 tons, and asphalt rubber hot mix
significant amount of full depth removal and
concrete, over 13,000 tons. However, this project
did not only include the planning and paving of replace, as well as utility adjusting, traffic loop asphalt, the scope of work also included curb ramp installation, striping/marking and some minor concrete work.
reconstruction, minor electrical work, slurry seal
application, aggregate base application, and
signing, striping, and marking.

Start Date September 2020 July 2019
Project
End Date December 2020 December 2019
Cost Contract Amount $ 6,252,000 $ 4,480,399
Sully-Miller Contracting Company | 135S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
Pavement Rehabilitation at Various Locations -
Project Full Name > Greenstone Avenue Street Improvements Street, Water, and Sewer Improvements
Project Santa Fe Springs, CA
Lynwood, CA
Location
Project Owner City of Lynwood City of Santa Fe Springs
Contact Name Noe Martinez Robert Garcia
Contact Role/
Public Works Assistant Associate Civil Engineer
Position
Telephone (310) 603 - 0220 (562) 868 - 0511
Email [email protected] [email protected] At just over a mile long and exiting in a location
within a heavy industry district in Santa Fe Springs,
With a job location spanning over five square miles Greenstone Avenue needed an overhaul to say in six different unique locations, this project proved
the least. The full scope of work included with this
to have challenging aspects not only from its project was cold milling of asphalt concrete, location, but also with its broad scope of work. This applying a new layer of asphalt rubber hot mix job included level work such as street resurfacing, asphalt, application of roller compacted concrete, Facility Information Project various types of concrete work, traffic signing and striping; as well as underground work at the utility adjustment, signing, striping and the Description construction of PCC curb and gutters, curb ramps, various locations, which incorporated sanitary driveways, cross gutters and sidewalks. The city of sewer system repairs (with CIPP lining), new Santa Fe Springs provided an offsite (yet close to water mainline installation including the service
and the jobsite) lot that contained a mobile asphalt
laterals, smart metes, fire hydrants
plant to induct and mix the materials needed for
appurtenances.
the roller compacted concrete, which was then
transported to the job site.

Start Date October 2020 June 2019
Project
End Date February 2021 January 2020
Cost Contract Amount $ 3,468,000 $ 3,444,361
Sully-Miller Contracting Company | 135 SState College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
710K
Project Full Name > Prairie Avenue Improvements Sherman Way Streetscape Improvements Project Location Inglewood, CA Reseda, CA
Project Owner City of Inglewood City of Los Angeles
Contact Name Hunter Nguyen Courtney Luc
Contact Role/
Position Associate Engineer Project Manager
Telephone (310) 412 - 5333 (213) 847 - 2354
Email [email protected] [email protected] Located directly off of Prairie Avenue sits the At just under a mile, this four lane arterial required Forum, an iconic entertainment venue, and the (at more than just a standard grind and overlay. On time) currently under construction Sofi top of the cold planning, hot mix asphalt Stadium. Both of which bring heavy traffic to this placement, base application and minor concrete two mile stretch of a six lane arterial. The scope of work, this job's scope of work also included, traffic Project work for this improvement project included signal construction/relocation, minor electrical Description surveying, traffic control, over 500,000 square feet work, utility adjustment and a large amount of of cold planning, construction of hot mix asphalt beautification work. The beautification work and asphalt rubber hot mix, placement of base encompassed the construction of tree wells, tree material, almost 1000 cubic yards worth of planting, mulch placement, top soil furnishing, concrete improvements, utility adjustment, almost 10,000 square feet of landscaping and the signing, striping, and traffic loop restoration. application of cobblestone.

Start Date February 2020 April 2020
End Date July 2020 May 2021
Cost Contract Amount $ 3,258,000 $ 2,623,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
WELCOM
Pedestrian Path Improvements at Various
Project Full Name > 2021 Arterial Street Overlay
Locations in Boron and Desert Lake
Project
Location Boron, CA Palmdale, CA
Project Owner County of Kern City of Palmdale
Contact Name Michelle Burns-Lusich Marc Zuber
Contact Role/
Position Public Works Manager Public Works Project Manager Telephone (661) 882 - 8861 (661) 267 - 5300
Email [email protected] [email protected] To preserve the historical significance of the
Twenty Mule Team Road, where a majority of the
work for this project had been done, constructing
and/or reconstructing the pedestrian pathways
This project called for a mass amount of pavement
and the asphalt of the road itself was completed
with much care and respect. Adding up to almost to be cold planed and repaved, over one million square feet, and required a polymer modified
four miles in distance, the job itself had notable asphalt concrete instead of conventional hot mix Facility Information Project concrete and asphalt quantities for a two-lane Description asphalt or rubberized hot mix asphalt. This project road, consisting of over 1000 cubic yards of also included surveying, striping, marking, utility Portland cement concrete and over 5000 tons of l
adjusting, and traffic control within its scope of
asphalt cement. The complete scope of work for
work.
this project included constructing Class 1 bike
paths, multi-use paths, sidewalks, curbs, gutters,
curb ramps, drive approaches and paving hot mix
asphalt concrete.

Start Date May 2020 July 2021
End Date November 2020 August 2021
Cost Contract Amount $ 2,536,331 $ 2,067,000
Sully-Miller Contracting Company | 135SState College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m
SULLY-MILLER CONTRACTING CO.

License 747612A
135 S. State College Blvd., STE. 400 • Brea, CA 92821 * PHONE 714-578-9600 The Following are the names, addresses, and telephone numbers for all brokers and sureties from whom Bidder intends to procure insurance and bonds:

Agent for Surety:

Willis Towers Watson Insurance Services West, Inc.
2010 Main Street, Suite 1050
Irvine, CA 92614
Phone 949/885-1206
FAX 949/885-1225
Contact: Victoria Campbell
Surety :

Liberty Mutual Insurance Co.
8044 Montgomery Road Suite #137
Cincinnati, OH 45236
Phone 513/984-2222 X 321
FAX 513/984-3165
Contact: Kelley Brown
Surety:

Berkshire Hathaway Specialty Insurance
1314 Douglas Street
Omaha, NE 68102
Phone 770/625-2509
Contact: D.J. Conroy
Insurance:

Liberty Mutual Group
1133 Avenue of America
New York, NY 10036
Phone 800/227-9887 Ext 443
FAX 212/391-1954
Insurance:

Marsh USA
445 South Street Suite 210
Morristown, NJ 07962
Phone 973/401-5151
FAX 973/401-5045
Contact: Anton Schmitt
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-G
Construction Contract DBE Commitment
EXHIBIT 15-G CONSTRUCTION CONTRACT DBE COMMITMENT

1. Local Agency: City of Santa Clarita 2. Contract DBE Goal: 22%

3. Project Description: 2021-2022 Federal Resurfacing Project

4. Prolect Location: Various Locations

5. Bidders Name: Sully-Miller Contracting Company Prime Certifted DBE: • 7. Bid Amount: $ 3,962, 301.40

8. Total Dollar Amount for ALI Subcontractors: # 1249,841.00 9. Total Number of ALL, Subcontractors: 6 642, 4080 682,529.00

10. Bid 11. Description of Work, Service, or Materials 12. DBE 14. DBE Item 13. DBE Contact Informatior Dollar
Certification (Must be certified on the date bids are opened) Number Supplied Number Amount
LmSTeANslo2 951-616-313286
AL OIL STRUCKING 38327 200% 5. DATE AVE. BLOOMINGTON, CA #402, 012.00 192316
De TRAPAL CONTROL
TRAFFIL CONTEOL 45046 13905 ARTESIA BLUA CEReMOs, co90703 152, 000.00 vie lous SWEEPING 40089 CZSW. MOUNTAIN ANE LAHARRA, LA 1850,000.00

REYNAGA TRANSPORTATIUN
VARIOUS TessiNa 42110 1OSSE LINDENVAZE RODEA WHITTICR, LO $165,00.00

TRAFEK LOOPS LEACH FILLING
32-34 VASELORS 38033 946S. EMERALA ST ANAHEIM, LA #204,175.00 Local Agency to Complete this Section upon Execution of Award 873,187.00 $0.00

21. Local Agency Contract Number:

15. TOTAL CLAIMED DBE PARTICIPATION

22. Federal-Aid Project Number:

0.00. 23. Bid Opening Date: 22%

24. Contract Award Date:

IMPORTANT: Identify all DBE firms being clalmed for credit,

25. Award Amount: regardless of tier. Names of the First Tier DBE Subcontractors and their respective items) of work listed above must be consistent, where applicable with the names and Items of the work in the Local Agency certifies that all DBE certifications are valid and information on "Subcontractor List" submitted with your bid. Written confirmation of this form is complete and accurate
Latter February 23, 2023

26. Local Agency Representative's Signature 27. Date rer's Signature 17. Date 714/578-9600
28: Local Agency Representative's Name 29. Phone 18. Preparer's Name 19. Phone Assistant Secretary

30. Local Agency Representative's Title 20. Preparer's Tite JISTRIBUTION: 1. Original - Local Agency
Copy - Caltrans District Local Assistance Engineer (DLAE). Fallure to submit to DLAE within 30 days of contrac execution may result in de-obligation of federal funds on contract.

3. Include additional copy with award package.

LPP 18-01 Page 1 of 3
January 2019
**To Be Submitted within 48 Hours AFTER Bid Close**
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
EXHIBIT 15-H: PROPOSER/CONTRACTOR GOOD FAITH EFFORTS
Cost Proposal Due Date PE/CE
Federal-aid Project No(s). STPL-5450(102) _ Bid Opening Date March 9, 2021 CON The City of Santa Clarita established a Disadvantaged Business Enterprise (DBE) goal of

22.00c for this contract. The information provided herein shows the required good faith efforts to meet or excee he DBE contract goal
Proposers or bidders submit the following information to document their good faith efforts within five (5) calendar days from cost proposal due date or bid opening. Proposers and bidders are recommended to submit the following information even if the Exhibit 10-01: Consultant Proposal DBE Commitments or Exhibit 15-G:

Construction Contract DBE Commitment indicate that the proposer or bidder has met the DBE goal. This form protects the proposer's or bidder's eligibility for award of the contract if the administering agency determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid opening, or the bidder made a mathematical error.

The following items are listed in the Section entitled "Submission of DBE Commitment" of the Special Provisions, please attach additional sheets as needed:

A. The nares and dates of each publication in which a request for DBE participation for this project was placed by the bidder (please attach copies of advertisements or proofs of publication):

Publications Dates of Advertisement
B. The names and dates of written notices sent to certified DBEs soliciting bids for this project and the dates and methods used for following up initial solicitations to determine with certainty whether the DBEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.):

Names of DBEs Solicited Date of Initial Solicitation Follow Up Methods and Dates

Page 1 of 3 ends

May 2020
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of
(Y/N) Contract
Pick 0.00%
Pick 0.00%
Pick 0.00%
Pick 0.00%
D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DBEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE:

Names, addresses and phone numbers of rejected DEs and the reasons for the bidder's rejection of the DBEs:

Names, addresses and phone numbers of firms selected for the work above:

E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was provided to DBEs:

Page 2 of 3 ends

May 2020
DocuSign Envelope ID: E93D81F8-0029-4AB9-83E0-B2ADB942F2B8 Local Assistance Procedures Manual Exhibit 15-H
Proposer/Contractor Good Faith Effort
F. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining bonding, lines of credit or insurance, necessary equipment, supplies, materials, or related assistance or services, excluding supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate:

G. The names of agencies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE firms (please attach copies of requests to agencies and any responses received, i.e., lists, Internet page download, etc.):

Name of Agency/Organization Method/Date of Contact Results H. Any additional data to support a demonstration of good faith efforts:

Page 3 of 3 ends

May 2020
:

Douse i 8 12 523013002008350-82089425288 Exhibit 17-0
Disadvantaged Business Enterprises (DEE) Certification Status Change N/A
EXHIBIT 17-O DISADVANTAGED BUSINESS ENTERPRISES (DBE) CERTIFICATION STATUS CHANGE / 7. Lecal Agency Contract Number T2. Federal-Aid Project Number 3. Local Agency T4. Contraci Completion Date CIty of Santa Clarita

5. Contractor/Consultant 6. Business Address 7. Final Contract Amount

10. DBE 12. Certification/

8. Contract 11. Amount Paid Decertification
item 9. DBE Contact Information Cortilication While Certifiad Date 13. Comments Number Number (Letter Altached)
If thare were no charges h the DEE certification of subcontractors/subconsullants, Indicale on the fom.

I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT

14. Contractor/Consultant Representalive's Signature ] 15. Contractor/Consultant Representalive's Name 1 16. Phone T 17. Date

CERTIFY THAT THE CONTRACTING RECORDS AND ON-SITE PERFORMANCE OF THE CBE(S) HAS BEEN MONITORED

18. Local Agency Representaive's Signature 116. Local Agency Representative's Name 20. Phone T21. Date 661 284-1420

Page 1 of 2 ends

July 23, 2015
ocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 Exhibit 17-0 Disadvantaged Business Enterprises (DBE) Certification Status Change

INSTRUCTIONS -DISADVANTAGED BUSINESS ENTERPRISES (DBE)

CERTIFICATION STATUS CHANGE

1. Local Agency Contract Number - Enter the Local Agency contract number or identifier.

2. Federal-Aid Project Number - Enter the Federal-Aid Project Number.

3. Local Agency - Enter the name of the local or regional agency that is funding the contract. ...

4. Contract Completion Date - Enter the date the contract was completed.

5. Contractor/Consultant - Enter the contractor/consultant's firm name.

6. Business Address - Enter the contractor/consultant's business address.

7. Final Contract Amount - Enter the total final amount for the contract.

8. Contract Item Number - Enter contract item for work, services, or materials supplied provided. Not applicable for consultant contracts.

9. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted contractors/consultants.

10. DBE Certification Numbex - Enter the DBE's Certification Identification Number.

11. Amount Paid While Certified - Enter the actual dollar value of the work performed by those subcontractors/subconsultants during the time period they are certified as a DBE.

12. Certification/Decertification Date (Letter Attached) - Enter either the date of the Decertification Letter sent out by the Office of Business and Economic Opportunity (OBFO) or the date of the Certification Certificale mailed out by OBEO.

13. Comments - If needed, provide any additional information in this section regarding any of the above certification status changes.

14. Contractor/Consultant Representative's Signature - The person completing the form on behalf of the contractor/consultant's firm must sign their name.

15. Contractor/Consultant Representative's Name - Enter the name of the person preparing and signing the

16. Phone - Enter the area code and telephone number of the person signing the form.

17. Date - Enter the date the form is signed by the contractor's preparer.

18. Local Agency Representative's Signature - A Local Agency Representative must sign their name to that the contracting records and on-site performance of the DBE(s) has been monitored.

19. Local Agency Representative's Name - Enter the name of the Local Agency Representative signing the form.

20. Phone - Enter the area code and telephone number of the person signing the form.

21. Date - Enter the date the form is signed by the Local Agency Representative.

Page 2 of 2 ends

July 23, 2015
DocuSign Envelope ID: E93D61F8-0029-4AB9-83EO-B2ADB942F2B8

IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Sections 2200 et seq.)
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. M0142
City of Santa Clarita, California
As required by California Public Contract Code section 2204, Proposer certifies that the option checked below relating to Proposer's status in regard to the Iran Contracting Act of 2010 (Public Contract Code sections 2200 et seq.) is true and correct:

Proposer is not:
identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code section 2203; or a financial institution that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

Los Angeles County has exempted Proposer from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, Los Angeles County will be unable to obtain the goods and/or services to be provided pursuant to the Contract. • The amount of the Contract payable to Proposer for the Project is less than $1,000,000.

CERTIFICATION
I, the official named below, CERTIFY UNDER PENALTY OF PERJURY, that I am duly authorized to legally bind the Proposer to the above selected option. This certification is made under the laws of the State of California.

Contractor
Sully-Miller Contracting Company I batters
Firm
February 23, 2023 Jeff Galterio, Assistant Secretary
Date Name/Title
Note: In accordance with Public Contract Code section 2205, false certification of this form shall be reported to the Callfornia Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years.

END OF DOCUMENT
•
DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IFB TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea - State:_CA _ Zip: 92821
•
Name of DBE firm: LMS TrunspoRt
Address: 2005 S. Date Are
City: Boomington State: CA _ Zip: 92316
Telephone: 951-616-3808
Description of work to be performed by DBE firm:

Oil supply and haul
The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of this work $ 41S,193°0@402,012.00
The percentage value of thls work (in comparison to the total contract value) % 0-Htg 10.14 Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values as stated above
By Ashtay Carton M
Title Office Manage
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB842F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IF TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company - .

Address: 135 S. State College Blvd., Ste. 400
City: Brea State: CA _ Zip: _ 92821
Name of DBE firm: DC TRAFFIC CONTROL
Address: 13905 ARTESIA BLUD
City: CORRITOS State: CA _ Zip: 90703
Telephone:

Description of work to be performed by DBE firm:

TRAFFIC CONTROL
The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of this work $ 52,000
The percentage value of this work (in comparison to the total contract value) % | • 3 Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values as stated above

AARON CALDERON
By.

Tite PRESIDENT
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IF TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea State: CA _ Zip: 92821
Name of DBE arm: Cincy Trump In... DBA. Lindys Cold planing, Address: 1025 L, Mountain New Aue
City: La Habin State:_ (A - Zip: _ 20631
Telephone: 5262:69t.228l
Description of work to be performed by DBE firm:

Asphalt winding, Sweeping and Dulverizing
The bidder is committed to utilize the above-named DBE firm for the work described above. 20 The dollar value of this work $ 50,000
The percentage value of this work (in comparison to the total contract value) % 1-3 Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values as stated above
ву Bacona Trump
Title C.5.0.

If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

Docusign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

LETTER OF INTENT AND AFFIRMATION TO PERFORM AS A DBE

SUBCONTRACTOR/SUPPLIER/BROKER/TRUCKER
IFB TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea State: CA _ Zip: 92821
Name of DBE firm: Traffic Loops Crackfilling, Inc.

Address: _946 S Emerald St
City: Anaheim _ State: CA _Zip: 92804
Telephone: (714) 520-4026
Description of work to be performed by DBE firm:

Traffic Loops, Install Temporary Video Detection System, Traffic Nodes The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of this work $ 204,175.00
The percentage value of this work (in comparison to the total contract value) % S. 13 Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values By - •
Title Vice President
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 IEB NO:

IF TITLE:

Name of Prime bidder's firm: Sully-Miller Contracting Company Address: 135 S. State College Blvd., Ste. 400
City: Brea . State: CA _ Zip: 92821
•
Name of DBE firm: Reynaga Transportation Inc.

Address:_11721 Whittier Blvd #560
City: Whittier . State:_ CA _ Zip: 90601
Telephone:_562-556-3657
Description of work to be performed by DBE firm:

Haul dirt, sand, gravel, and aggregate material.

The bidder is committed to utilize the above-named DBE firm for the work described above.

The dollar value of this work $ +5317500165,000.00
The percentage value of this work (in comparison to the total contract value) % 3.8. 7. 4.16% Affirmation
The above-named DBE firm affirms that it will perform the portion of the contract for the values as stated above
By -
Title Vice President
If the bidder does not receive award of the prime contract, any and all representations in this letter of Intent and Affirmation shall be null and void.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106) Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California
To the CITY OF SANTA CLARITA:

In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106, the Bidder declares that the bld Is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly Induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not In any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged Information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THE "BIDDER'S CERTIFICATION" SHALL

ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH FORM A PART OF THE PROPOSAL. BIDDERS ARE CAUTIONED THAT MAKING A FALSE CERTIFICATION MAY SUBJECT THE CERTIFIER TO CRIMINAL PROSECUTION.

DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

NON-COLLUSION AFFIDAVIT
Bid #CIP-22-23-M0142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California

TO BE EXECUTED BY EACH BIDDER OF A PRINCIPAL CONTRACT

STATE OF CALIFORNIA

COUNTY OF LOSANGELES
Orange
Jeff Galterio - being first duly sworn deposes and says that he/she is the Assistant Secretary sole owner, a partner, president, etc.) of the party making the foregoing bid; that such
Sully-Miller Contracting Company
bid is not made in the interest of or behalf of any undisclosed person, partnership, company, association, organization or corporation, that such bid is genuine and not collusive or sham, that said BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, or that anyone shall refrain from bidding, that said BIDDER has not in any manner, directly or indirectly sought by agreements, communication or conference with anyone to fix the bid price of said BIDDER or of any other BIDDER, or to fix the overhead, profit, or cost element of such bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in such bid are true, and further, that said BIDDER has not, directly or indirectly, submitted its bid price, or any breakdown thereof, or the contents thereof, or divulged information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company, association, organization, bid depository, or to any member or CITY thereof, or to any other individual information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company association, organization, bid depository, or to any member or CITY thereaf, orto any other individual, except to such person or persons as have a partnership or other financial interest with said BIDDER in his general business.

IValters
Bidder:

Signature
Title Jeff Galterio, Assistant Secretary.

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange
On March 4, 2023 before me, J. Daniels, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

J. DANIELS WITNESS my hand and official seal.

Notary Public - California
Orange County
Commission # 2377975 Signature Дани
My Comm. Expires Oct 9, 2025
Place Notary Seal Above
- OPTIONAL -
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Non-Collusion Affidavit _ Document Date: February 23, 2023 Title or Type of Document:

Number of Pages: 1 Signers) Other Than Named Above:_
Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:
* Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator 7 Other: • Other:
igner Is Representing Signer Is Representing: -
Sully-Miller Contracting Compan
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8

NOTICE TO BIDDERS REGARDING CONTRACTUAL REQUIREMENTS
Bid #CIP-22-23-MO142
2021-2022 Federal Resurfacing Project
City Project No. MO142
City of Santa Clarita, California

SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS

1. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual Indemnity language and Insurance Requirements may include additional provisions Questions and requests for modification of these terms must be negotiated and approved prior to bid submission and are at the full discretion of the City.

2. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor's liability under this agreement. The full coverage and limits afforded under Contractor's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required.

The Insurance obligations under this agreement shall be: 1—all the Insurance coverage and limits carried by or available to the Contractor; or 2-the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City.

3. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CL policy listing all policy endorsements to City before work begins. City reserves the right to require full-certified copies of all Insurance coverage and endorsements.

I. INDEMNIFICATION:

City and its respective elected and appointed boards, officials, officers, agents, employees, and volunteers (individually and collectively, "Indemnitees") shall have no liability to CONTRACTOR or any other person for, and CONTRACTOR shall indemnify, defend, protect, and hold harmless Indemnitees from and against, any and all liabilitles, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs, and expenses of whatever nature, including reasonable attorney's fees and disbursements (collectively, "Claims), which Indemnitees may suffer or incur or to which Indemnitees may become subject by reason of or arising out of any injury to or death of any person(s), damage to property, loss of use of property, economic loss, or otherwise occurring as a result of or allegedly caused by the CONTRACTOR'S performance of or failure to perform any services under this Agreement, or by the negligent or willful acts or omissions of CONTRACTOR, its agents, officers, directors, or employees, committed in performing any of the services under this Agreement.

If any action or proceeding is brought against Indemnitees by reason of any of the matters against which CONTRACTOR has agreed to indemnify Indemnitees as provided above, CONTRACTOR, upon notice from City, shall defend Indemnitees at its expense by counsel acceptable to City, such acceptance not to be unreasonably withheld. Indemnitees need not have first paid for any of the matters to which Indemnitees DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 are entitled to indemnification in order to be so indemnified. The limits of the insurance required to be maintained by CONTRACTOR in this Agreement shall not limit the liability of CONTRACTOR hereunder. The provisions of this section shall survive the expiration or earlier termination of this agreement.

The provisions of this section do not apply to Claims occurring as a result of the City's active negligence or acts of omission.

II. INSURANCE
CONTRACTOR shall maintain and submit certificates of all applicable insurance including, but not limited to, the following and as otherwise required by law. The terms of the insurance policy or policies issued to provide the above insurance coverage shall provide that said insurance may not be amended or canceled by the carrier, for non-payment of premiums or otherwise, without thirty (30) days prior written notice of amendment or cancellation to the CITY. In the event the said insurance is canceled, the CONTRACTOR shall, prior to the cancellation date, submit to the City Clerk new evidence of insurance in the amounts established.

Liability Insurance
During the entire term of this Agreement, the CONTRACTOR agrees to procure and maintain General Liability insurance at its sole expense to protect against loss from liability imposed by law for damages on account of bodily injury, including death therefrom, suffered or alleged to be suffered by any person or persons whomsoever, resulting directly or indirectly from any act or activitles, errors or omissions, of the CITY, or CONTRACTOR or any person acting for the CITY, or under its control or direction, and also to protect against loss from liability imposed by law for damages to any property of any person caused directly or indirectly by or from acts or activities of the CITY, or CONTRACTOR or any person acting for the CITY, or under its control or direction. Such public liability and property damage insurance shall also provide for and protect the CITY against incurring any legal cost in defending claims for alleged loss. Such General, Public and Professional liability and property damage insurance shall be maintained in full force and effect throughout the term of the Agreement and any extension thereof in the amount indicated above or the following minimum limits:

Commercial General Liability Insurance, including coverage for Premises and Operations, Contractual Liability, Personal Injury Liability, Products/Completed Operations Liability, and Independent Contractors' Liability (if applicable), in an amount of not less than two million dollars ($2,000,000.00) per occurrence, four million dollars ($4,000,000.00) annual aggregate, written on an occurrence form.

Products/Completed Operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the CONTRACTOR for covered claims arising out of the actions of independent contractors. If the CONTRACTOR is using subcontractors, the policy must include work performed "by or on behalf" of the CONTRACTOR. Policy shall contain no language that would invalidate or remove the CONTRACTOR'S duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the CONTRACTOR.

Worker's Compensation Insurance
The CONTRACTOR shall procure and maintain, at its sole expense, Worker's Compensation Insurance in the amount of $1,000,000 per occurrence or in such amount as will fully comply with the laws of the State of Califarnia and which shall indemnify, insure and provide legal defense for both the CONTRACTOR and the CITY against any loss, claim or damage arising from any injuries or occupational diseases happening DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 to any worker employed by the CONTRACTOR in the course of carrying out the work within the Agreement. Such insurance shall also contain a waiver of subrogation naming the City of Santa Clarita.

Automotive Insurance
The CONTRACTOR shall procure and maintain, at its sole expense, throughout the term of this Agreement, and any extension thereof, public liability and property damage insurance coverage for automotive equipment with coverage limits of not less than $1,000,000 combined single limit for each accident. All such insurance shall be primary insurance and shall name the City of Santa Clarita as an additional insured.

Builder's Risk
Upon commencement of construction and with approval of CITY, CONTRACTOR shall obtain and maintain Builder's Risk Insurance for the entire duration of the Project until only the CITY has an insurable interest.

The Bullder's Risk coverage shall include the coverages as specified below:

The named insureds shall be CONTRACTOR and CITY, including its officers, officials, employees, and agents. All subcontractors (excluding those solely responsible for design work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to CITY.

The policy shall contain a provision that all proceeds from the Builder's Risk Policy shall be made payable to the CITY. The CITY will act as a fiduciary for all other interests in the Project.

Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project.

There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include:
(1) coverage for any ensuing loss from faulty workmanship, nonconforming work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the site or any staging area. Such insurance shall be on a form acceptable to CITY to ensure adequacy of terms and sub-limits and shall be submitted to the CITY prior to commencement of construction.

Fire and Extended Coverage Insurance (Services involving real property only) CONTRACTOR agrees to procure and maintain, at its sole expense, during the term of this Agreement, and any extension thereof, a policy of fire, extended coverage and vandalism insurance.

Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions Contractors Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions with limit no less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of one year.

Coverage must be included for bodily injury and property damage, including coverage for loss of use and/or diminution in property value, and for clean-up costs arising out of, pertaining to, or in any way related to the actual or alleged discharge, dispersal, seepage, migration, release or escape of DacuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 contaminants or pollutants, arising out of or pertaining to the services provided by CONTRACTOR under this Agreement, including the transportation of hazardous materials or contaminants.

Professional Liability it Design-Build)
Professional Liability Insurance, insuring against professional errors and omissions arising from CONTRACTOR'S work on the Project, in an amount not less than [$2,000,000] combined single limit for each occurrence. If CONTRACTOR cannot provide an occurrence policy, CONTRACTOR shall provide Insurance covering claims made as a result of performance of work on this Project and shall maintain such insurance in effect for not less than three years following final completion of the Project.

Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against the CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against the CITY, and shall require similar written express waivers and insurance clauses from each of its subconsultants.

Separation of Insureds
A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR'S insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer's limits of lability. The pollcy(ies) shall not contain any cross-liability exclusions.

Pass Through Clause
CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirerents of this section. CONTRACTOR agrees that upon request, all Agreements with consultants, subcontractors, and others engaged in the project will be submitted to the CITY for review.

Self-Insured Retentions
Any self-insured retentions must be declared to and approved by the CITY. The CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the CITY.

Primary and Additional Insured
All of such insurance shall be primary and shall name the City of Santa Clarita as additional insured. A Certificate of Insurance and an additional insured endorsement (for general and automobile liability, evidencing the above insurance coverage with a company acceptable to the City's Purchasing Agent shall be submitted to the CITY prior to execution of this Agreement on behalf of the CITY.

Requirements
Should CONTRACTOR, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain coverage at CONTRACTOR'S expense and deduct the cost of such insurance DocuSign Envelope ID: E93D61F8-0029-4AB9-83E0-B2ADB942F2B8 from payments due to CONTRACTOR under this Agreement or terminate. In the alternative, should CONTRACTOR fail to meet any of the insurance requirements under this Agreement, CITY may cancel the Agreement immediately with no penalty.

Should CONTRACTOR'S insurance required by this Agreement be canceled at any point prior to expiration of the policy, CONTRACTOR must notify CITY within 24 hours of receipt of notice of cancelation.

Furthermore, CONTRACTOR must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancelation. CONTRACTOR must ensure that there is no lapse in coverage.

If the operation under this Agreement results in an increased or decreased risk in the opinion of the City's Purchasing Agent, then the CONTRACTOR agrees that the minimum limits herein above designated shall be changed accordingly upon request by the City's Purchasing Agent.

The CONTRACTOR agrees that provisions of this paragraph as to maintenance of insurance shall not be construed as limiting in any way the extent to which the CONTRACTOR may be held responsible for the payment of damages to persons or property resulting from the CONTRACTOR'S activities or the activities of any person or persons for which the CONTRACTOR is otherwise responsible.

I have read and understand the above requirements and agree to be bound by them for any work performed for the City.
mustarted some Off Salterio Date: February 23, 2023
Printed Name: Jeff Galterio, Assistant Secretary
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange
On March 4, 2023 before me, _ J. Daniels, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose names) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

J. DANIELS
WITNESS my hand and official seak
Notary Public - California
Orange County
Commission # 2377975
My Comm. Expires Oct 9, 2025 Signature.

Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Do Notice to Bidders Regarding
Title or Type of Document: Sighers) Other Than Named Abave: _ Document Date: February 23, 2023 Number of Pages: _
Capacity(ies) Claimed by Signers)
Signer's Name: Jeff Galterio Signer's Name:

X Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact ] Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: Signer Is Representing:

Sully-Miller Contracting Company
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 Local Assistance Procedures Man E0-BADB942F288 Exhibit 12-B Bidder's List of Subcontractors (DBE and Non-DBE)
Exhibit 12-B: Bidder's List of Subcontractor (DBE and Non-DBE) - Part 1 As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts must be registered with the State Division of Industrial Relations and certified to bid on Public Works contracts. Please register at https://www.dir.ca.gov/Public-Works/Contractor- Registration.html. The local agency will verify registration of all contractors and subcontractors on public works projects at bid and thereafter annually t assure that yearly registration is maintained throughout the life of the project In accordance with Title 49, Section 26.11 of the Code of Federal Regulations, and Section 4104 of the Public Contract Code of the State of California, as amended, the following information is required for each sub-contractor who will perform work amounting to more than one half of one percent (0.5%) of the Total Base Bid or $10,000 (whichever is greater).

FEDERAL PROJECT NUMBER:

Photocopy this form for additional firms. STPL-5450(102) Subcontractor Name & Location Line Item & Description Subcontract Percentage of Contractor License Number DBE DBE Cert Number Annual Gross Receipts Amount Bid Item (YIN)
Subcontracted
DIR Reg Number
NAME < 51 million
6 - 8 PARTIAL 754500 < $5 million
LTI SWEEPINEA $50,00000 VeRIouS * <S10 million
City, State 40089 < $15 million
1000009423 As gearsm in 15+

LA HABRA, LA
NAME 7-9 1< $1 million
569352 < $5 million
PRS 11-12 < $10 million
City, State #271,75600 100% N X < $15 million
Age of Firm in
JURUPA JELLOY,LA 1000003363 20t
NAME < $1 million
15-31 x<55 million
PLI 415490
$ 72,440.00 < $10 million
City, State 100% N < $15 million

MARKINGS
AZUSA, LA 1000813536 A Years in 15%
NAME <$1 million
13-14 < $5 million
EBS UTILITY 932798 x < 510 million
50-51 HAJUSTINA $$39000.00 N < $15 million
City, State 100%
72-73 1000004286 Age of Firm in
CORONA, LA years 20t
NAME < $i million
32-34 652956 X < $5 million
TRAFFIL LOOP CRACKELLIWEA < $10 million
ELECTRILAL #204,175.00 100% Y 38033 < $15 million
City, State
ANAHEIM, CA 1000003794 150
NAME PARTINZ < $1 million
2,37,62 1015478 x < $5 million
DE TRAFFIL CONTROL TRAFFIL CONTROL $52,000 00 2-20%. < $10 million City, State Ý 45046 < $15 million
37 - 407.
1000039211 Age of Firm in
LERRITOSICA 62 - 80% years
NAME < $1 millior
<$5 million
7< $10 million
City, State < $15 million
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
As garam in
NAME < $1 million
< $5 million
< $10 million
City, State < $15 million
Distribution - Original: Local Agency File; Copy: DLAE w/Award Package