Tasks in this proposal include the following:

Task 1. Conduct Video Survey
Geosyntec will subcontract Pacific Surveys, LLC, to conduct video surveys within the seven recommended wells. Video surveys would be conducted using a downhole camera with downhole and side-scan color cameras. Th is proposal includes one Geosyntec staff present during the video surveys. At the City’s request, less oversight by Geosyntec can be conducted.

Task 2. Review Results of Video Survey and Recommendations Upon receipt of the video surveys from either Pacific Surveys or City of Santa Clarita, Geosyntec will review the video logs and cons truct a summary table of the key findings for each of the surveyed wells. The video surv eys will be reviewed for 1) integrity of the bottom of the wells and 2) the possible need for redevelopmen t, as indicated by features such as clogging of the well screens or buil dup of material inside the wells that would cover the well screens.

Task 3. Review Pump Records from Flow Services, Inc.

Geosyntec will review the past four events co nducted by Flow Services, Inc. to identify pumps that are no longer functioning and the potential reas ons for the pump status. This task may include a teleconferen ce with Flow Services, Inc. st aff to clarify the status of various sites.

Task 4. Technical Memorandum
Geosyntec will prepare a short technical memorandum summarizing the findings and recommendations to repair or replace each of the evaluated wells and pumps and provide planning-level costs to conduct the recommended work. Geosyntec will convene a meeting to review the informa tion and prioritize the work at the sites so that documents can be prepared for Task 5.

Task 5. Prepare Technical Specifications for Bidding
Based on the meeting conducted in Task 4 w ith City staff, Geosyntec will prepare technical specifications for recommended repairs to the top five sites selected in the meeting conducted as part of Task 4. The deliverable for Task 5 will include:
 A description of the work needed at each of the selected sites  Details on processes and parts that are required to complete the work

9.b
Packet Pg. 153
Attachment: Geosyntec Scope of Work (DBAA 3 & 24 – CONTRACT AWARD AND APPROPRIATION OF RESERVE PROJECTS FUNDING) Geosyntec DBAA24 Proposal 202303
Ms. Kelly Kacmar
Proposal – DBAA Well Repair/Replacement Evaluation
March 17, 2023

Page 3 ends

 Engineer’s estimate for the work included in the document The technical specifications will be provided to the City for incorporation into standard RFP documents. A draft version of the tech nical specifications will be prepared.

Following review by the City, Geosyntec will address the City’s comments and prepare a final version.

Assumptions:
 Task 1 assumes the City will remove the water pumps from the seven selected wells prior to the video surveys.
 The City or their subcontractor(s) will evaluate the pump discharge tubing, electrical and other features for potential repairs. Geosyntec will incorporate these recommendations into the technical memorandum described in Task 3. Field investigations to evaluate the status of the well pumps or electrical facilities at the wells are not included in this proposal.
 If applicable, the City will be responsib le for reinstalling the well pumps upon completion of each video survey.

Project Schedule
This project is proposed to take approxi mately eight weeks fro m Notice to Proceed (NTP). This schedule assumes the video surveys are conducted within two weeks of the NTP.

Project Budget
The proposed fee for this project is below presented below.

Task Estimated Cost
Task 1: Video Surveys $11,500
Task 2: Review Video Survey Results $5,500
Task 3: Review Pump Records from FSI $2,600
Task 4: Technical Memorandum $7,100
Task 5: Prepare Technical Specifications for Bidding $19,300 Totals $45,800

The project will be billed on time and materi als basis according to the attached rate schedule up to the not-to-exceed budget total.

9.b
Packet Pg. 154
Attachment: Geosyntec Scope of Work (DBAA 3 & 24 – CONTRACT AWARD AND APPROPRIATION OF RESERVE PROJECTS FUNDING) Geosyntec DBAA24 Proposal 202303
Ms. Kelly Kacmar
Proposal – DBAA Well Repair/Replacement Evaluation
March 17, 2023

Page 4 ends

If you have any questions regarding this pr oposal, feel free to c ontact David (206-496- 1446) or Tara (323-533-2571) at your convenience. We look forward to continuing to work with you on this project.

Sincerely,

David L. Parkinson, PhD., L.G. (WA) Tara Rolfe, PG, CHG (CA) Principal Senior Hydrogeologist

9.b
Packet Pg. 155
Attachment: Geosyntec Scope of Work (DBAA 3 & 24 – CONTRACT AWARD AND APPROPRIATION OF RESERVE PROJECTS FUNDING)

CONFIDENTIAL

RATE2023

GEOSYNTEC CONSULTANTS
2023 U.S. R ATE SCHEDULE

Staff Professional $154
Senior Staff Professional $178
Professional $198
Project Professional $224
Senior Professional $254
Principal $274
Senior Principal $294

Technician I $ 83
Technician II $ 89
Senior Technician I $ 99
Senior Technician II $106
Site Manager I $116
Site Manager II $128
Construction Manager I $142
Construction Manager II $152

Senior Designer
Designer
$190
$160
Senior Drafter/Senior CADD Operator $ 145
Drafter/CADD Operator/Artist $ 130
Project Administrator $ 85
Clerical $ 65

Direct Expenses Cost plus 12%
Subcontract Services Cost plus 12%
Technology/Communications Fee 3% of Professional Fees
Specialized Computer Applications (per hour) $ 15
Personal Automobile (per mile) Current Gov’t Rate
Photocopies (per page) $ .09

Rates are provided on a confidential basis and are client and project specific.

Unless otherwise agreed, rates will be adjusted annually based on a minimum of the Producer Price Index for Engineering Services.

Rates for field equipment, health and safety equipment, and graphical supplies presented upon request.

Construction management fee presented upon request.

9.b
Packet Pg. 156
Attachment: Geosyntec Scope of Work (DBAA 3 & 24 – CONTRACT AWARD AND APPROPRIATION OF RESERVE PROJECTS FUNDING)

Page 1 ends

Agenda Item: 10

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: July 11, 2023
SUBJECT: MODIFICATION OF MEMORANDUM OF AGREEMENT WITH LOS

ANGELES COUNTY AND MODIFICATION OF CONTRACTS WITH

LARRY WALKER ASSOCIATES AND TETRA TECH INC
DEPARTMENT: Neighborhood Services
PRESENTER: Darin Seegmiller

RECOMMENDED ACTION

City Council:

1. Amend Memorandum of Agreement with Los Angeles County and the Los Angeles County Flood Control District.

2. Amend the existing contract with Larry Walker Associates to increase scope of work due to increased National Pollutant Discharge Elimination System Permit requirements and authorize an expenditure authority increase in the amount of $15,000 for a total contract amount not to exceed $642,594.

3. Amend the existing contract with Tetra Tech Inc. to increase the scope of work due to the increased National Pollutant Discharge Elimination System Permit requirements and implement the Comprehensive Human Waste Source Reduction Strategy, and authorize an expenditure authority increase in the amount of $401,996 for a total contract amount not to exceed $1,312,991.

4. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.

BACKGROUND
On October 13, 2020, the City Council approved a five-year Memorandum of Agreement (MOA), and cost sharing between the City of Santa Clarita (City), Los Angeles County (County), and the Los Angeles County Flood Control District (Flood Control District) to develop and implement the Coordinated Integrated Monitoring Program (CIMP) and Enhanced 10 Packet Pg. 157

Page 2 ends

Watershed Management Plan/Watershed Management Program (EWMP/WMP). These documents are required for compliance with the Municipal Stormwater National Pollutant Discharge Elimination System Permit (NPDES Permit).

After a competitive process, the City Council awarded two, three-year contracts with up to two one-year extensions on June 22, 2021. One contract is for water quality monitoring to Tetra Tech Inc. (Tetra Tech) in the amount of $910,993. The second contract is for NPDES Permit compliance and reporting to Larry Walker Associates in an amount of $627,594. Although the City administers the contracts related to this program, it is only responsible for 39 percent of the associated costs. The remaining 61 percent is the responsibility of Los Angeles County.

This item for City Council consideration is a request to amend the existing MOA between the City, County, and Flood Control District, in addition to the related contracts with Tetra Tech and Larry Walker Associates.

Larry Walker Associates

The Los Angeles Regional Water Quality Control Board approved a new NPDES Permit that became effective on September 11, 2021. This new version of the NPDES Permit doubled the reporting requirements that are the subject of the MOA. The requirement to increase reporting was not known prior to approval of the current MOA. These changes doubled reporting frequency and increased data collection and analyses that are performed with the Larry Walker Associates contract. A proposal from Larry Walker Associates for the increased scope is attached.

Tetra Tech

The new version of the NPDES Permit also required new monitoring obligations and changed the way water quality monitoring is used to determine compliance. These changes have resulted in more stringent reporting, water quality requirements, and source investigations. The changes require increased water quality investigations that are performed with the Tetra Tech contract.

The City and County have made considerable progress in dry weather water quality from the storm drain system. However, there have been difficulties in addressing intermittent, dry-weather sources of bacteria. In order to address this concern, the new NPDES Permit requires a revised approach, focused on targeted and aggressive source identification and removal of dry weather flows. This approach requires amending the Tetra Tech contract to include a Comprehensive Human Waste Source Reduction Strategy (CHWSRS).

The CHWSRS is a study and abatement program to identify high risk human sources of bacteria and abate them if found. This effort will start with assessing the drainage area to MTD 1510 (drainage map attached) to identify and abate human sources of contamination that pose the greatest risk to water quality. It will be important to investigate additional drainage areas as a result of the more stringent bacteria requirements. Examples of abatement actions that could be identified and implemented through the CHWSRS may include enforcement or removal of leaking septic tanks; repair or replacement of leaking sewer pipes by the Sewer Maintenance District; or addressing encampments of persons experiencing homelessness near the monitoring 10 Packet Pg. 158

Page 3 ends

station. A proposal from Tetra Tech for the increased scope is attached.

Staff proposes to amend the Tetra Tech contract to implement CHWSRS, the Larry Walker Associates contract to address reporting and data collection, and MOA amendments to address these issues.

ALTERNATIVE ACTION

Other action as determined by the City Council.

FISCAL IMPACT

With the requested amendments referenced in the recommended action, there will be adequate funds in the existing budget appropriations.

ATTACHMENTS
MTD 1510 Drainage Map
Tetra Tech CHWSRS SOW Amendment
LWA SOW Amendment
USCR MOA Amendment, TSO and Scope (available in the City Clerk's Reading File) USCR MOA Amendment, TSO and Scope- Redline (available in the City Clerk's Reading File) 10 Packet Pg. 159
MTD 1356
PD 1235
PD 1947PD 1946PD 2010
PD 1594PD 1114MTD 1539 U03
MTD 1517
PD 1594
PD 1886
MTD 1356
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community LegendProposed Sample SitesCatch BasinMaintenance HoleMain Stormwater PathwayNatural DrainageGravity MainLateral LineRecreationUndevelopedCommerical & IndustrialResidentialCatchment0 0.2 0.40.1 MilesUpper Santa Clara River WatershedMTD 1510 Chloride Investigation - Preliminary Sample Sites

10.a
Packet Pg. 160
Attachment: MTD 1510 Drainage Map (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING PROGRAM) Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work 1 02/27/2023

Scope of Work for
CHWSRS Work Plan Development and Investigation Implementation

INTRODUCTION
The Upper Santa Clara River (USCR) Watershed Management Group (WMG) has faced multiple challenges achieving recreational water quality standards in the USCR and wasteload allocations within the Santa Clara River Bacteria TMDL (Bacteria TMDL). To support existing efforts conducted under the USCR Watershed Management Plan (WMP) and better protect public health and support recreational beneficial use goals, the USCR WMG began developing a Comprehensive Human Waste Source Reduction Strategy (CHWSRS) Work Plan (Plan) in 2021. The CHWSRS approach leverages recent advancements in the use of human markers and other diagnostic tools, as well as an enhanced focus on targeted source control efforts, to protect recreational beneficial uses and make progress towards compliance with associated water quality standards and Bacteria TMDL requirements. Strategy planning began in 2021 with an initial prioritization and revised WMP language to set the stage for a more effective pathway to improved public health through a reduction in high-risk human pathogen sources.

CHWSRS control measures conducted in parallel with implementation of the WMP will support USCR Bacteria TMDL compliance and long-term WMP goals through an adaptive management process that incorporates significant advances in the state of the science. Ongoing regulatory conversations within the region and the development of implementation approaches such as CHWSRS by the USCR WMG provide support for policies that implement more effective source control efforts. Completing the CHWSRS Work Plan on an accelerated timeline in 2023 will also support regulatory discussions with the Los Angeles Regional Water Quality Control Board on the Bacteria TMDL compliance schedule.

TECHNICAL APPROACH
The goal of CHWSRS is to support the WMG better align implementation actions with the goal of reducing pathogen health risk to recreators. The scope herein will build upon the preliminary catchment prioritization conducted in 2021 to develop a final CHWSRS Work Plan and initiate dry weather human waste source investigations (HWSIs) in Reach

6. This will be accomplished through the tasks outlined below.

TASK 1: PROJECT MANAGEMENT
Tetra Tech will follow established project management protocols and maintain regular communication with the City. The task includes project initiation, scheduling, monthly invoicing, and progress reports, coordination with the City, and other administrative tasks for the duration of this project. Mr. Tim Tringali will collaborate with Mr. Clint Boschen and Ms.

Shannon Quigley-Raymond to provide progress updates and attend monthly virtual coordination meetings. An initial kickoff meeting will be held with the City to discuss the project schedule, coordination requirements , draft Work Plan outline, and project objectives.

Deliverables:
• Monthly invoices and progress updates
• Kickoff call and monthly meetings

10.b
Packet Pg. 161
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work 2 02/27/2023
TASK 2: CHWSRS WORK PLAN
The USCR CHWSRS Work Plan will prioritize identifying and abating high-risk human sources of pathogens to support the focus on bacteria as a water quality priority for the USCR WMG. Tetra Tech will leverage the annotated draft CHWSRS Work Plan outline developed in 2021 (included as Appendix A) and discussion during the kickoff call to further develop and finalize the plan. The CHWSRS Work Plan will focus only on Reach 6 and emphasize dry weather source identification and abatement activities.

Tetra Tech will incorporate additional data and complete refinements needed to develop the Work Plan. Additional data from water quality monitoring conducted between July 2021 and December 2022 will be incorporated into the prioritization. In addition, refinements to the MS4 catchments and network based on feedback on the initial prioritization will be completed to develop the final Reach 6 prioritization and identify the prioritized catchments for HWSIs. Tetra Tech will also develop an ESRI ArcGIS Online map to accompany the Work Plan and provide easy access and navigation of the available data and layers. The GIS layers in the ArcGIS Online map will include MS4 network, major outfalls, inlets, water quality monitoring sites, and catchments.

Following the data additions and refined prioritization, Tetra Tech will develop a draft CHWSRS Work Plan. Following WMG review, Tetra Tech will incorporate requested updates and edits from the draft in the final Work Plan. Along with the clean final version, Tetra Tech will submit a track changes version with responses to comments in the document.

During the finalization of the Work Plan, a Sampling Analysis Plan (SAP) and Quality Assurance Project Plan (QAPP) will be developed for the program. The overall source investigation approach will include a range of traditional and non-traditional pathogen health risk indicators available to aggressively and effectively track and identify human waste sources of pathogens. Physical, bacterial, viral, and/or chemical markers may be used to support source identification efforts, and will be selected based on available knowledge for the areas of concern.

Deliverables:
• Draft Work Plan
• ESRI ArcGIS Online Reach 6 Catchment Maps
• Final Work Plan
• Draft SAP/QAPP
• Final SAP/QAPP
TASK 3: MEETING AND REGULATORY SUPPORT
During the investigation phase of the project, the WMG will be regularly informed of the status of the HWSI for each AOI by way of updates at monthly WMG CIMP meetings or separate meetings. Validated data will be summarized within a standard series of tables and charts and distributed to the WMG via the monthly meetings. It is assumed that up to eight meetings will be supported by Tetra Tech in the first year.

On an as-needed basis, Tetra Tech will provide the City support for discussions or responses to comments related to Bacteria TMDL compliance strategies. Tetra Tech will prepare presentations and provide content related to the HWSI progress, high-risk based approach to bacteria and participate in up to two Regional Board meetings on the CHWSRS Work Plan or Bacteria TMDL.

Deliverables:
• LA Regional Board regulatory engagement, comment, and meeting support • Up to eight presentations at monthly meetings
TASK 4: HUMAN WASTE SOURCE INVESTIGATIONS
Tetra Tech will initiate HWSIs following the framework outlined in the CHWSRS Work Plan and will investigate up to three dry weather AOIs. To begin, Tetra Tech will prepare a template reporting form (AOI Reporting Form) for each of

10.b
Packet Pg. 162
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work 3 02/27/2023
the three targeted AOIs that will document existing information relevant to the AOI, support additional stakeholder information requests needed to inform planning for each HWSI, and provide a summary of the monitoring plan. The form will also be used for documenting the iterative progress of each AOI HWSI as field and laboratory data are generated.

From the information compiled, any needed modifications to the catchment delineations will be completed and AOI- specific monitoring plans will be finalized by Tetra Tech. The AOI monitoring plan will be documented in a simple and streamlined way within the AOI Reporting Form to facilitate easy communication with the City and WMG regarding the status of and approach to each HWSI. It is anticipated that up to three iterations of this plan will be needed for each AOI to generally reflect the following phases of the investigation: Receiving Water, Outfall, and Catchment Level 1. In addition, the maps developed as part of the CHWSRS Work Plan will be customized with AOI monitoring plan details in ESRI ArcGIS Online. An ESRI Field Maps form will be developed for data collection via the mobile app as part of the investigation. Data collected using the field form will include the status of flow at outfalls and connectivity of any outfall flow to downstream receiving waters.

Following the finalization of the AOI-specific monitoring plan, Tetra Tech will prepare a LACFCD Access Permit application as necessary and submit the corresponding permit fees to support the HWSI receiving water, outfall and catchment phases for the three AOIs. Tetra Tech will then proceed with phased (i.e., receiving water, outfall, and catchment) implementation, relying on the CHWSRS Work Plan-specified Action Levels to guide risk-based decision- making about subsequent steps of the HWSI. Tetra Tech has established a preliminary set of assumptions regarding the number of sample sites, monitoring events, HF183 analytical batches, and HF183 sample analysis rate for each individual phase of the HWSI. These assumptions are documented in Table 1. Monitoring activities for the Receiving Water, Outfall, and Catchment Levels are included in the Scope of Work. Due to the iterative nature of source investigations and the fact that the outcome of monitoring associated with each phase of the HWSI is unknown at this time, the assumptions documented in Table 1 will be closely monitored, and should changes be anticipated, Tetra Tech will provide recommended adjustments.

Table 1. HWSI AOI Assumptions1

Receiving
Water
Phase2
Outfall
Phase3
Catchment
Phase,
Level 13
Catchment
Phase,
Level 23,4
Catchment
Phase,
Level 33,4
Catchment
Phase,
Level 43,4
# of Locations 3 4 3 2 2 2
# of Events 12 12 8 8 8 -
# of HF183 Batches 2 2 2 2 1
Notes:
1 Paired sampling for E. coli and HF183 will occur at all locations, with all E. coli samples analyzed. 2 75% of E. coli samples meet the USCR CHWSRS Work Plan trigger to analyze the paired HF183 samples. 3 65% of E. coli samples meet the USCR CHWSRS Work Plan trigger to analyze the paired HF183 samples. 4 Catchment Investigation levels 2-4 are not included in scope and f ee. E. coli and HF183 samples will be analyzed by contracted accredited analytical laboratories in accordance with specifications defined in the SAP/QAPP.

Upon receipt of analytical laboratory results, Tetra Tech will review the results for completeness and consistency with the Data Quality Objectives specified in the SAP/QAPP. Tetra Tech will coordinate with the laboratories regarding any data quality concerns. Tetra Tech will populate the AOI Reporting Forms with a brief Interim Data Summary upon completing the Receiving Water, Outfall, and Catchment Level 1 Phases for each HWSI (nine total). It is assumed that additional summaries will not be needed in subsequent catchment level phases based on decisions made in earlier phases with respect to the monitori ng results and to allow for timely progression of catchment level investigations. A final data summary will be provided via the AOI Reporting Form after the completion of each HWSIs with laboratory reports and data files in CEDEN-compatible format.

10.b
Packet Pg. 163
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work 4 02/27/2023
Assumptions
• Modifications to the catchment delineations will require minor adjustments rather than intensive large- scale changes.
• One catchment investigation will require permitted confined space entry for sampling. • The permit to access Los Angeles County Flood Control District (LACFCD) assets can be used for the investigations, and no other access permits are required. • See Table 1 for HWSI sample analysis and site assumptions. • Tetra Tech will rent a -80C freezer for 1 year t o store the HF183 filters after 1-year, unanalyzed filters will be discarded or transferred to a location of the City’s choice (i.e., alternate laboratory).

Deliverables
• LACFCD Permit Application
• AOI Report Form Template
• Field Maps App
• Interim Data Summaries for each AOI (receiving water, outfall and catchment level 1) • Final Data Summary for each AOI

10.b
Packet Pg. 164
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work 5 1/30/2023

SCHEDULE
The schedule is summarized in Table 2 below and is based on months from NTP.

Table 2. CHWSRS Work Plan and Investigation Implementation Schedule Task
# Task Name Deliverable Completion
1 Project Management Invoice and Progress
Report Monthly
2 CHWSRS Work Plan

Draft Work Plan 3 Months from NTP
Final Work Plan 4 Months from NTP
2 Draft SAP/QAPP 4 Months from NTP
Final SAP/QAPP 5 Months from NTP
3 Meeting and Regulatory Support
Meeting slides As needed, 16 months
from NTP
3 Talking points, comment
responses
As needed, 16 months
from NTP
4 Human Waste Source Investigations
LACFCD Access Permit
Application
As applicable, 6 months
from NTP
4 Investigations (3 AOIs) 16 months from NTP
4 Final Status Summaries 16 months from NTP

10.b
Packet Pg. 165
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work 6 1/30/2023

COST
Tetra Tech proposes to complete the work on a Time and Materials basis and will invoice monthly according to Tetra Tech standard invoicing periods.

10.b
Packet Pg. 166
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work CHWSRS SOW Appendix A
APPENDIX A: CHWSRS WORK PLAN OUTLINE

DRAFT OUTLINE
Executive Summary
Table of Contents
List of Figures
List of Tables
Appendices
List of Acronyms and Abbreviations

1.0 Introduction

1.1. Purpose
• Discuss project purpose, goals, and desired outcomes
• Brief, big picture- human waste

1.2. Regulatory/Scientific Background
• SCR Bacteria TMDL
• Existing MS4 Permit

1.3. Relationship to the USCR WMP/CIMP
• Recent WMP Update
o Bacteria Priority 1 (highest priority)
o New MS4 Permit

1.4. Progress/Work to Date
• Weekly bacteria sampling at Reach 6 and its two paired outfalls • CIMP monitoring

1.5. Document Organization
• Brief summary and table summarizing how the work plan is organized

2.0 Comprehensive Human Waste Source Reduction Strategy Steps

2.1. Monitoring and Assessment Framework
• Overview and Flow Chart
• Emphasize the following themes:
o Receiving water monitoring, followed by upstream investigations (as needed) to identify/abate sources
o Prioritize areas with greatest REC use/risk
o Prioritize dry weather investigations to focus resources. Also, identify areas that would benefit from near-term wet weather investigations
o Initial use for Catchment Prioritization and then adapt as necessary over time to refine the prioritization and better target Source ID and abatement efforts based on data collected, scientific advancements, regulatory updates, etc.
• Introduce conceptual site model/graphics depicting differences between dry and wet weather sources and transport, and how that informs dry and wet weather investigation and abatement • Introduce Catchment Prioritization approach
o Graphic that communicates the steps and individual components of the scoring. Discuss rationale for the key components selected and how they’re integrated (source composite scores, matrix plots, and other factors)
o Discuss process for delineating catchments and data used o Include table or writeup that briefly summarizes the major human sources considered (sewer exfil, encampments, etc.), why they are important (utilize WMP language, Bacteria TMDL etc.), data used, current assumptions/limitations, and scoring methods

3.0 REC-1 Receiving Water Quality Condition Assessment

10.b
Packet Pg. 167
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work CHWSRS SOW Appendix A
• Summarize Current Dry and Wet Weather Conditions
o Data analysis methods. Discuss parameters/data period used, analysis methods o Summarize results. Reference CIMP annual report adaptive management language • Describe how the results were used in Catchment Prioritization. Include example maps to show how we linked the receiving water results to catchments to assess connectivity and potential impacts. Reference 303(d)/TMDL segments and overlay on maps o SCR Bacteria TMDL
• Describe data gaps and refinements that can be used to support future prioritization and source identification/abatement efforts

4.0 Upstream Water Quality Condition Assessment
• Summarize Dry and Wet Weather Conditions
• Include paired FIB/HF183 data analysis methods/results. Describe how the results were used in Catchment Prioritization. Include example maps to show how we linked the Reach/Outfall results to catchments to assess connectivity and potential impacts. Reference 303(d)/TMDL segments and overlay on maps
o SCR Bacteria TMDL
• Describe data gaps and refinements that can be used to support future prioritization and source tracking/abatement efforts

5.0 Catchment Prioritization

5.1. Preliminary Catchment Prioritization Results
• Discuss changes based on adjustment factors
• WMA map that shows catchment prioritization rankings (considering dry and wet weather separately)

6.0 Source Identification Monitoring

6.1. Human Waste Source Investigation Overview
• AOI Characterization
• Stakeholder Coordination
• Additional Data/Source Inventory
• Monitoring Strategy
o Toolbox
o Sites
o Timing
• Outcomes

7.0 Source Abatement

7.1. Enforcement and Source Abatement Actions
• Brief overview of key programs/strategies
• Include summary table

7.2. Outcomes

8.0 Performance Monitoring

8.1. Phase 3
• Source Inventory Updates
• Monitoring Activities
• HWSI Coordination and Investigation Close Out
• Outcomes

9.0 Work Plan Adaptation Process
• Allow for flexibility to adapt to changing conditions, resource allocation, progress, potential future refinements due to regulatory/compliance pathway updates, etc. • WMP and RAA updates. Discuss potential use of new indicators and compliance methods in the future depending on regulatory decision-making.

10.b
Packet Pg. 168
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING Upper Santa Clara River
Comprehensive Human Waste Source Reduction Strategy Scope of Work CHWSRS SOW Appendix A
• Progress Tracking and Verification (Performance Monitoring) o Verification steps and collaboration needs
o Align with monitoring recommendations and Alternative Indicators o Better incorporation of “risk” in the future to help streamline efforts

10.0 Reporting

10.1. Work Plan

10.2. Progress Updates Per Investigation

10.3. Annual Reporting and CEDEN EDDs
o Adaptive Management, every 2 years as part of the annual reporting

10.4. Monthly Bacteria TMDL Reports
o Weekly sampling

11.0 Continued Work
References

10.b
Packet Pg. 169
Attachment: Tetra Tech CHWSRS SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING

February 16, 2023
Heather Merenda
City of Santa Clarita
Environmental Services Division
23920 Valencia Blvd.

Santa Clarita, CA 92355
[email protected]
Subject: Augment Request to Support Additional Reporting Requirements Dear Ms. Merenda:

The Los Angeles Regional Water Quality Control Board (Regional Board) has recently updated guidance on how to complete Section 1.4 , Water Body Pollutant Combination (WBPC) compliance analysis for the Watershed Management Program (WMP) Progress Report. This new guidance increased the complexity of the analysis compared to the previous response methodology. To effectively respond to this change, Larry Walker Associates (LWA) is requesting an additional $15,000 be added to the original budget applied over the remaining period of the contract titled Professional Services Agreement Between the City of Santa Clarita and Larry Walker Associates for Coordinated Integrated Monitoring Plan Implementation and Update dated June 22, 2021. The additional budget w ill give LWA sufficient resources for the added complexity and hours that are now needed to complete this analysis in line with the updated Regional Board guidance through the end of the contract on June 30, 2024.

This augment will be added to Task 003, Reporting , as indicated in the table below. On approval , the budget amounts, budget remaining, and % spent for each tas k will be updated and reflected on the following monthly invoice.

Task
Number Task Name Task Budget
(6/22/2021)
Additional Task
Budget
(2/16/23)
Updated
Budget
001 Program Management $63, 825 - $63, 825
002 Source ID Additional Monitoring $35,030 - $35,030
003 Reporting $172,850 $15,000 $187,850
004 Updating Program $55,889 - $55,889
005 Special Studies $300,000 - $300,000
Total $627,594 $15,000 $642,594

Please feel free to contact me at (949) 235-4621 should you have any questions.

Cordially,

David Vilas
Senior Scientist

10.c
Packet Pg. 170
Attachment: LWA SOW Amendment (MOA AND CONTRACT AMENDMENTS FOR COORDINATED INTEGRATED MONITORING PROGRAM)

Page 1 ends

Agenda Item: 11

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: July 11, 2023
SUBJECT: VALENCIA GLEN PARK PLAY AREA- DESIGN-BUILD

CONTRACT
DEPARTMENT: Neighborhood Services
PRESENTER: Susan Nelson

RECOMMENDED ACTION

City Council:

1. Award a design-build contract to Great Western Installations, Inc., to design and build a play area at Valencia Glen Park in the amount of $999,070 and authorize a contingency in the amount of $200,930 for a total contract amount not to exceed $1,200,000.

2. Authorize the appropriation of $1,200,000 in Community Development Block Grant funds, (Fund 203), Project expenditure account P1019203-516101.

3. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.

BACKGROUND

The current playground at Valencia Glen Park (VGP) was installed in 1997, and modifications to the swings were completed in 2018. The VGP Play Area project will replace the existing playground equipment and expand the overall footprint. The new playground design will provide an accessible play area that welcomes children and adults to interact, play, learn, and grow together. This project will remove barriers and offer play experiences that promote integrated play for residents of all abilities and further develop physical, cognitive, sensory, communication and social skills.

Moreover, this project exemplifies the City of Santa Clarita's (City) commitment to improving its residents' quality of life and supports the Building and Creating Community theme of Santa Clarita 2025. The focus area identified in the Parks and Recreation 5-Year Plan is to maximize accessibility by offering inclusive play elements and design principles for people of all ages and 11 Packet Pg. 171

Page 2 ends

abilities.

In May 2023, the City released a Request for Qualifications inviting interested firms to submit their qualifications for the design and construction of a new playground for VGP. The City received two submissions and determined that both design-build firms, Great Western Installations, Inc., and Landscape Structures, Inc., were qualified to undertake this project.

After finalizing the playground design parameters and characteristics, the City issued a Request for Proposal (RFP) inviting the two pre-qualified firms to submit their proposals for the design and construction of the new playground at VGP. The RFP solicited firms to identify their relevant experience on similar projects, provide evidence of qualifications, and demonstrate their approach for this design-build project.

The City received proposals from Great Western Installations, Inc., and Landscape Structures, Inc. The proposals were evaluated by a panel of City staff who ranked each proposal based on the following criteria:

• The content, format and completeness of the written proposal • Demonstrated understanding of the described project and scope of work • Design Build Entity experience on similar projects
• Submitted design concept with inclusive play elements and recommendations • Adherence to the performance criteria for delivering the best possible project • Perceived technical competence and creative ability
• Ability to provide the deliverables based on a work plan and project schedule that meets or exceeds the City’s project schedule
• Quality and professionalism of the proposal
• Total cost of services
• Overall best value to the City

Following the evaluation process, Great Western Installations, Inc., received the highest score as outlined below.

Rank Company Location Score
1 Great Western Installations, Inc. Logan, Utah 92.6
2 Landscape Structures, Inc. Delano, Minnesota 84.2

Per section 22164 of the California Public Contract Code, design-build contract awards are not subject to a low bid obligation, compared to the traditional design-bid-build method. Rather, they shall be awarded via a best value procurement methodology in addition to cost of services.

Great Western Installations, Inc., demonstrated an in-depth understanding of the project needs and provided a detailed scope of work and approach to the project. They analyzed the existing site conditions and identified vital design factors that must be addressed. Based on their design experience with similar projects, the completeness of their proposal, and their cost of services, staff recommends awarding the design-build contract to Great Western Installations, Inc., for a total contract amount of $999,070. At the completion of the design and before commencing construction, the design will be reviewed for design immunity purposes pursuant to Resolution 11 Packet Pg. 172

Page 3 ends

No. 19-6.

The requested contingency will cover any unforeseen issues or additional needs during the design and construction. The remaining funds will cover staff oversight related to construction and project management, public works inspection, labor compliance, and administrative costs.

ALTERNATIVE ACTION
Other action as determined by the City Council.

FISCAL IMPACT

Upon approval of the recommended actions, adequate funds will be available in the Fiscal Year 2023-24 budget to project expenditure account P1019203-516101 Community Development Block Grant (Fund 203) to support the recommended contract and project administrative costs.

ATTACHMENTS
VGP Map
RFP Response (available in the City Clerk's Reading File) 11 Packet Pg. 173
Valencia Glen Park Playground
Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P, NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and the GIS User Community
Points
Override 1
Parks
City Park
County Park
State Park
Schools
City of Santa Clarita Boundary
Street Centerlines
Freeway
Entrance Ramp
Exit Ramp
State Route
Primary
Secondary
Minor
Alleyway
Railroad
Unpaved
Santa Clara River
7/3/2023, 6:50:20 AM
0 0.055 0.110.0275 mi
0 0.085 0.170.0425 km
1:2,257
Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. The City of Santa Clarita does not warrant the accuracy of the data and assumes no liability for any errors or omissions.

11.a
Packet Pg. 174
Attachment: VGP Map (Valencia Glen Park Inclusive Play Area)

Page 1 ends

Agenda Item: 12

CITY OF SANTA CLARITA

AGENDA REPORT

CONSENT CALENDAR
CITY MANAGER APPROVAL:

DATE: July 11, 2023
SUBJECT: FINAL TRACT MAPS, ACCEPTANCE OF OFFERS OF

DEDICATION, AND REJECTION OF IRREVOCABLE OFFERS OF
DEDICATION FOR TRACT MAPS NO. 51644-16 AND 51644-17
(TESORO HIGHLANDS)
DEPARTMENT: Public Works
PRESENTER: Amalia Marreh

RECOMMENDED ACTION

City Council:

1. Approve Final Tract Maps for Tract No. 51644-16 and Tract No. 51644-17.

2. Accept on behalf of the public the offers of dedication and grant of: (1) the easement for public use and road purposes; (2) the easements for sanitary sewer and sanitary sewer ingress and egress purposes; (3) all sanitary sewers and appurtenant structures; (4) the easements for covered storm drain, storm drain appurtenant structures, ingress and egress purposes; (5) the right to restrict or prohibit the erection or construction of any buildings or structures within lots 101, 102, and 104 through 125, inclusive, on Tract No. 51644-16; (6) the right to restrict or prohibit the erection or construction of any buildings or structures within lots 132 through 151, inclusive, on Tract No. 51644-17; and (7) the right to restrict or prohibit any and all allowable uses or construction within those areas designated as open space on these maps.

3. Reject the irrevocable offers of dedication and grant in fee simple of all lots 90, 91, and 92 of Tract No. 51644-16 and all lots 123 and 124 of Tract No. 51644-17 for flood control purposes.

4. Authorize the City Manager or designee to rescind the rejection and accept the offer of dedication and grant in fee simple all of lots 90, 91, and 92 of Tract No. 51644-16 and lots 123 and 124 of Tract No. 51644-17 when construction of the improvements are completed to the satisfaction of the Director of Public Works.

12 Packet Pg. 175

Page 2 ends

5. Make findings as follows: This project is consistent with the provisions of Sections 66474 and 66474.1 of the Subdivision Map Act and should be approved.

6. Instruct the Director of Administrative Services to endorse the Special Assessment Statement on the face of the Final Tract Map for Tract No. 51644-16 and Final Tract Map for Tract No. 51644-17, which indicates all special assessments levied by the City of Santa Clarita are paid.

7. Instruct the City Clerk to endorse the City Clerk’s Statement on the face of the Final Tract Map for Tract No. 51644-16 and Final Tract Map for Tract No. 51644-17, which embodies the approval of said maps, the acceptance of the dedications shown thereon, and the rejection of the irrevocable offer of dedication and grant in fee simple shown thereon.

8. Instruct the City Surveyor to endorse the City Surveyor’s Statement on the face of the Final Tract Map for Tract No. 51644-16 and Final Tract Map for Tract No. 51644-17, which provides for verification that the map is technically correct.

9. Instruct the City Engineer to endorse the City Engineer’s Statement on the face of Final Tract Map for Tract No. 51644-16 and Final Tract Map for Tract No. 51644-17 which provides for verification of substantial conformance with the Tentative Tract Map and all provisions of local ordinances and state laws applicable at the time of approval.

BACKGROUND

The Final Tract Maps for Tract No. 51644-16 and Tract No. 51644-17, a location map exhibit of which is attached hereto, have been reviewed by City of Santa Clarita (City) staff and found to be in substantial conformance with the principles and standards required by the Unified Development Code and State Subdivision Map Act. On November 7, 2018, the Los Angeles County Department of Regional Planning approved the Revised Vesting Tentative Tract Map No. 51644-1. On November 12, 2019, the City Council approved the Tesoro del Valle Annexation (Master Case 19-115). This area was subsequently annexed to the City on November 14, 2022. The subject property on both maps is located within the Tesoro del Valle area, north of Tesoro del Valle Road.

Lots 90, 91, and 92 of Tract Map No. 51644-16 and lots 123 and 124 of Tract Map No. 51644-17 are lots to be developed as debris and desilting basins for flood control purposes. The offer of dedication in fee simple for these lots is being rejected on the map to limit the City’s liability until the improvements are constructed and completed to the satisfaction of the Public Works Director. Following acceptance, ownership of the basins will be transferred to Los Angeles County Flood Control District.

The Final Tract Map No. 51644-16 consists of a subdivision of 75.93 acres into 122 lots and allows for the construction of 89 single-family residential units, two private park lots, 24 open space lots, two public streets, and various private street and utility service lots.

The Final Tract Map No. 51644-17 consists of a subdivision of 100.06 acres into 153 lots and allows for the construction of 122 single-family residential units, 20 open space lots, and various 12 Packet Pg. 176

Page 3 ends

private streets and utility service lots.

The Final Tract Maps for Tract No. 51644-16 and Tract No. 51644-17 were reviewed to the satisfaction of the City Surveyor and the City Engineer and found to be in substantial conformance with the previously approved Tentative Tract map. The conditions of approval established by the County of Los Angeles and adopted by the City were also met and fees have been and/or will be paid as indicated on the attached Fact Sheets. Therefore, the Final Tract Maps are ready for City Council approval and acceptance of the dedications shown thereon.

Pursuant to Section 66474.1 of the Subdivision Map Act, a legislative body shall not deny approval of a final or parcel map if it was previously approved as a tentative map for the proposed subdivision and if it finds the final or parcel map is in substantial compliance with the previously approved tentative map.

ALTERNATIVE ACTION
Staff has not identified alternative actions that would conform to requirements set forth in the Subdivision Map Act.

FISCAL IMPACT

The public streets shown on the Final Tract Map for Tract No. 51644-16 will be dedicated to the City and will be constructed by the developer. The maintenance of this additional asphalt will have minimal impact on the City's street maintenance budget.

ATTACHMENTS
Location Map
Fact Sheet TR51644-16
Fact Sheet TR51644-17
12 Packet Pg. 177

12.a
Packet Pg. 178
Attachment: Location Map (APPROVE MAP/ACCEPT/REJECT OFFERS OF DEDICATION TR51644-16 AND

FACT SHEET
TRACT MAP 51644-16

Location: Within the Tesoro community north of Tesoro del Valle Road.

Acreage: Approximately 75.93 acres

Number of Lots: One hundred twenty-two (122)

Use: Eighty-Nine (89) single family residential units, two (2) private park lots, twenty-four (24) open space lots, and various private street and utility service lots.

Owner: BLC Tesoro LLC, a Delaware Limited Liability Company.

Trails/Paseos: No new trails are being dedicated to the City by this map.

Streets: This map is dedicating Corte Ballenas and Paseo Tranquilo as public streets.

B&T Fees: All applicable Bridge and Thoroughfare (B&T) Fee(s) will be paid prior to the issuance of building permits, in accordance with the conditions of approval issued by the County of Los Angeles prior to annexation.

Transit Fees: The Transit Fee obligation was not required by County of Los Angeles.

Quimby Fees: The Quimby obligation for the development has previously been satisfied with the dedication of 12 acres for a private park.

School Fees: All applicable School fee(s) will be paid prior to issuance of building permits.

12.b
Packet Pg. 179
Attachment: Fact Sheet TR51644-16 (APPROVE MAP/ACCEPT/REJECT OFFERS OF DEDICATION TR51644-16 AND TR51644-17 (TESORO))

FACT SHEET
TRACT MAP 51644-17

Location: Within the Tesoro community north of Tesoro del Valle Road.

Acreage: Approximately 100.06 acres

Number of Lots: One hundred fifty-three (153)

Use: One hundred twenty-two (122) single family residential units, twenty (20) open space lots, and various private street and utility service lots.

Owner: BLC Tesoro LLC, a Delaware Limited Liability Company.

Trails/Paseos: No new trails are being dedicated to the City by this map.

Streets: No new public streets are being dedicated to the City by this map.

B&T Fees: All applicable Bridge and Thoroughfare (B&T) Fee(s) will be paid prior to the issuance of building permits, in accordance with the conditions of approval issued by the County of Los Angeles prior to annexation.

Transit Fees: The Transit Fee obligation was not required by County of Los Angeles.

Quimby Fees: The Quimby obligation for the development has previously been satisfied with the dedication of 12 acres for a private park.

School Fees: All applicable School fee(s) will be paid prior to issuance of building permits.

12.c
Packet Pg. 180
Attachment: Fact Sheet TR51644-17 (APPROVE MAP/ACCEPT/REJECT OFFERS OF DEDICATION TR51644-16 AND TR51644-17 (TESORO))