Aden Av
10'X25' Bore Pit
Railroad A
V5701577 - 7x14'x8
Main St
V5701578 - 7'x14'x8'
Newhall
Community
Center
Sta
gth
gth Market St
V5701579 - 7'x14'x8
gin
SCE will be installing a new 16kV underground circuit at the crossing shown above - To provide reliable electrical power for residential and commercial growth. There has been substantial and continuing growth in the surrounding communities. - Trench and Excavate
-To install 6- 5" conduits
- After conduit installation, 1-5" will be used to pull 3/C - 1000 JCN cable from bore pit structure to 2-1 14x8 a if structures 5701577 8 570157% to be installedure 5701579.