RESOLUTION NO. 24-___
A

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,

CALIFORNIA ACCEPTING AND ADOPTING THE ANNUAL IMPACT FEE REPORT PURSUANT TO GOVERNMENT CODE SECTION 66000 ET SEQ.

W
HEREAS, the City of Santa Clarita imposes development fees that are subject to the Mitigation Fee Act (Government Code Section 66000 et seq.), collectively Impact Fees; and W
HEREAS, pursuant to Government Code Sections 66006 and 66013, the City is required to prepare an annual report regarding the collection and use of the Impact Fees within 180 days after the close of each fiscal year; and
W
HEREAS, pursuant to Government Code Section 66001, the City is required make findings with respect to any unexpended Impact Fee funds every fifth fiscal year following the first deposit into the Impact Fee accounts; and
W
HEREAS, staff has prepared the City of Santa Clarita Annual and Five-Year Impact Fee Report also known as the Assembly Bill (AB) 1600 Report (Exhibit A), and incorporated by reference; and
W
HEREAS, the AB 1600 Report satisfies the reporting requirements stated in Government Code sections 66001, 66006, and 66013; and
W
HEREAS, notice was provided to the extent required by Government Code section 66006; and
W
HEREAS, notice of the time and place of the meeting, including the address where the report could be reviewed, was mailed, at least fifteen (15) days prior to the next regularly scheduled public meeting, to any interested party who requested it. The report has been available for public review at the City Clerk’s office and on the City’s website since December 27, 2023; and
N
OW THEREFORE, the City Council of the City of Santa Clarita, California, does hereby resolve as follows:

S
ECTION 1. In accordance with Government Code Section 66000 et seq., the City has conducted an annual and five-year review of its Impact Fees and capital infrastructure programs and the Council has reviewed the Annual Impact Fee Report for the Fiscal Year 2022-23, attached hereto as (Exhibit A), which is hereby accepted and adopted as the report required pursuant to Government Code sections 66001, 66006, and 66013.

S
ECTION 2. The funds have been and shall be used for the purposes stated and are necessary to mitigate impacts resulting from development in the City and there is a reasonable

Page 2 of 2 ends

relationship between the use of the fees and the type of development project upon which the fee is imposed.

SECTION 3. The City Clerk shall certify to the adoption of this resolution.

PASSED, APPROVED, AND ADOPTED this 9th day of January 2024.

______________________________
MAYOR

ATTEST:

_______________________________

CITY CLERK

DATE:__________________________

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.

CITY OF SANTA CLARITA )

I, Mary Cusick, City Clerk of the City of Santa Clarita, do hereby certify that the foregoing Resolution No. 24- was duly adopted by the City Council of the City of Santa Clarita at a regular meeting thereof, held on the 9
th day of January 2024, by the following vote:

AYES: COUNCILMEMBERS:

NOES: COUNCILMEMBERS:

ABSENT: COUNCILMEMBERS:

______________________________

CITY CLERK

Exhibit A

Page 0 ends
Page 1 ends

Introduction and Background
The Mitigation Fee Act, as outlined in California Government Code Sections 66000 et seq., establishes certain legal and procedural parameters for the charging of development impact fees.

These fees are charged to new development projects and are required to be used only for those purposes for which the fees were collected.

Requirements for Development Impact Fee Reporting
The Mitigation Fee Act imposes certain accounting and reporting requirements for the fees collected. The fees must be deposited in a special account or fund to avoid commingling the fees with other funds and must earn interest. Fees are collected pursuant to various City resolutions, ordinances, conditions of approval, or other specific agreements. The amount of the City’s impact fees are included in the current adopted fee schedule and can be viewed on the City’s website: https://santaclarita.gov/city-fees/.

The Mitigation Fee Act requires local agencies to prepare an annual report and a five-year report that provide specific information about those fees. The City has elected to report on both requirements annually. The report is prepared for the fiscal year ending June 30 and is received and filed within 180 days of fiscal year end.

Annual Report
California Government Code Section 66006 (b) requires local agencies prepare an annual report with specific information about development impact fees. Specifically, the section requires the annual report include:
 66006 (b) (1) (A): A brief description of the type of fee in the account or fund.  66006 (b) (1) (B): The amount of the fees.
 66006 (b) (1) (C): The beginning (July 1) and ending (June 30) balance of a particular impact fee fund.
 66006 (b) (1) (D): The amount of the fees collected and interest earned.  66006 (b) (1) (E): An identification of each public improvement upon which fees were expended and the amount of expenditures on each improvement including the total percentage of the cost of the public improvement that was funded with fees.
 66006 (b) (1) (F): An identification of an approximate date by which the construction of the public improvement will commence if the local agency determines sufficient funds have been collected to complete financing on an incomplete public improvement.
 66006 (b) (1) (G): A description of each interfund transfer or loan made from the account or fund, including the public improvement on which the transferred or loaned fees will be expended; and, in the case of an interfund loan, the terms of the loan, including the repayment schedule for the loan, and the rate of interest that the account or fund will receive on the loan.
 66006 (b) (1) (H): The amount of refunds made due to sufficient funds being collected to complete financing of scheduled public improvements.

Page 2 ends

Five-Year Report
California Government Code Section 66006 (d) (1) requires local agencies make the following findings every fifth year for unexpended funds:
 66001 (d) (1) (A): Identify the purpose to which the fee is to be put.  66001 (d) (1) (B): Demonstrate a reasonable relationship between the fee and purpose for which it is charged.
 66001 (d) (1) (C): Identify all sources and amounts of funding anticipated to complete financing in incomplete improvements.
 66001 (d) (1) (D): Designate the approximate dates on which the funding is expected to be deposited into the appropriate account or fund.

The annual report and five-year report information is contained within the report’s exhibits.

Current and unfunded projects, including all funding sources and approximate dates of funding, can be found in the City’s Capital Improvement Program Budget on the City’s website:
https://santaclarita.gov/city-budget/.

Fee Name & Description
July 1, 2022
Beginning Fund
Balance
Revenue Expenditure Interest Income
June 30, 2023
Ending Fund
Balance
Project No. Est. Start
Date
Est. End
Date
Estimated Project
Cost
Estimated % of
project funded with
fees
Fire Facilities Mitigation Fee 364,985$ 1,367,714$ (1,641,523)$ 258,437$ 349,614$ For the construction and equipping of fire protection facilities.

Fire Station 104 364,985$ 1,367,714$ (1,641,523)$ 258,437$ 349,614$ 3066201 6/30/2021 Ongoing 14,438,698$ 100% Law Enforcement Facilities Fee 72,547$ 186,348$ (219,686)$ 1,333 $ 40,542$ For the construction of law enforcement facility and purchase of equipment.

SCV Sheriff's Station 72,547$ 186,348$ (219,686)$ 1,333 $ 40,542$ F3023306 5/24/2016 Ongoing 68,956,379$ 8% Library Facilities and Technology Mitigation Fee 3,986,918$ 233,619$ - $ 53,764$ 4,274,301$ Ongoing Ongoing Ongoing 100% To provide additional funds necessary for public library facilities and technology required to accommodate the library needs generated by new residential development.

Transit Facilities Mitigation Fee 352,144$ 37,311$ 11,022 $ 400,477$ For investment in transportation modes to maintain transportation services Vista Canyon Transit Projects 98,360$ - $ -$ 2,784$ 101,144$ FY 26-27 Ongoing Ongoing Ongoing Purchase of Expansion Buses 253,784$ 37,311$ - $ 8,238$ 299,333$ FY 25-26 Ongoing 1,654,678 $ 18% Parking in Lieu Fee - Old Town Newhall Parking Structure 90,749$ - $ -$ 1,246$ 91,995$ Ongoing Ongoing Ongoing 100% For public parking structure in Old Town Newhall.

Oak Tree Preservation Fee 134,985$ 9,375$ - $ 4,085$ 148,446$ Heritage Oak Preservation and Propagation Plan 55,140$ - $ -$ 1,560$ 56,700$ 1/1/2024 6/30/2024 56,700 $ 100% Oak Tree Preservation 79,846$ 9,375$ - $ 2,525$ 91,745$ Ongoing Ongoing 91,745 $ 100% Sewer Mitigation Fee 765,761$ - $ -$ 21,671$ 787,432$ For the cost of sewer infrastructure upgrades to mitigate the impact of new sewer connections.

Bouquet Canyon Road Sewer Trunk Line 338,660$ - $ -$ 9,584$ 348,244$ Ongoing Ongoing 338,660 $ 100% Soledad Canyon Road Sewer Trunk Line 154,138$ - $ -$ 4,362$ 158,500$ Ongoing Ongoing 659,721 $ 100% Walnut Street Sewer Trunk Line 102,023$ - $ -$ 2,887$ 104,910$ Ongoing Ongoing 1,280,716 $ 100% Orchard Village Sewer Trunk Line 170,940$ - $ -$ 4,838$ 175,778$ Ongoing Ongoing 851,800 $ 100% Site Improvements 565,509$ 9,000$ - $ 7,640$ 582,149$ To provide for improvements on specific site locations.

Utility Undergrounding 208,817$ - $ -$ 2,867$ 211,684$ Ongoing Ongoing 16,763,736 $ 100% Soledad Canyon 205,538$ -$ -$ 2,822$ 208,360$ Ongoing Ongoing 16,500,000$ 2% Kansas Street 3,279$ -$ -$ 45$ 3,324$ Ongoing Ongoing 263,736$ 100% Park Improvements 233,097$ 9,000$ - $ 3,077$ 245,175$ Ongoing Ongoing 250,000 $ 100% Needham Ranch Trail 123,594$ - $ -$ 1,697$ 125,291$ T3026306 7/1/2020 Ongoing 242,689$ 27% Street Infrastructure 575,640$ - $ (29,568)$ 8,503$ 554,575$ Bridge Widening Copper Hill Drive 405,304$ - $ (2,560)$ 5,607$ 408,352$ S1050306 1/1/2024 6/30/2026 4,000,000$ 100% This project will provide for design peer review and construction oversight of the developer funded/constructed project to widen the Copper Hill Drive bridge over San Francisquito Creek. The project will widen the bridge to include three lanes in each direction, median, barrier separated sidewalk and bicycle facilities, and associated improvements on the roadway approaches.

Vista Canyon Road Bridge - Design 170,335$ - $ (27,008)$ 2,895$ 146,223$ S3037306 8/9/2021 3/30/2024 350,000$ 100% This project will provide a bridge over the Santa Clara River and street improvements on Soledad Canyon Road at Lost Canyon and within limits of Vista Canyon development. Design completion is contingent on the developer's schedule. Staff continues working with the developer to complete the design contract documents. Staff recently returned 95 percent bridge plans to the developer.

Sidewalk Infrastructure 28,240$ - $ -$ 388$ 28,627$ FY 24-25 Ongoing 600,000 $ 5% Accumulated Interest Income restricted for Sidewalks.

Medians 454,755$ 230,154$ - $ 1,976$ 686,885$ Circulation Improvements of Valley Center Drive -$ 230,154$ - $ (4,267)$ 225,887$ C0072 1/3/2023 12/31/2025 225,887$ 100% This project provides for the construction of traffic circulation improvements which include median revisions, re-striping, landscape and irrigation, and traffic signal modifications.

Sierra Highway Medians 454,755$ - $ -$ 6,243$ 460,998$ 2029-30 2032-33 460,998 $ 100% For landscaping and irrigation of the medians on Sierra Highway along the frontpage of the development site.

Exhibit A
City of Santa Clarita
Annual Impact Fee Report
To protect and preserve oak trees in the City and to provide regulatory measures designed to accomplish this purpose.

Page 1 of 14 ends

Fee Name & Description
July 1, 2022
Beginning Fund
Balance
Revenue Expenditure Interest Income
June 30, 2023
Ending Fund
Balance
Project No. Est. Start
Date
Est. End
Date
Estimated Project
Cost
Estimated % of
project funded with
fees
Exhibit A
City of Santa Clarita
Annual Impact Fee Report
Traffic Signal Timing 10,583$ 6,284$ - $ 178$ 17,045$ To provide for traffic signal timing update as a result of significant changes in vehicular volumes and/or travel patterns due to development.

Newhall Avenue Corridor -$ 1,652$ - $ 47$ 1,699$ 2024-25 2027-28 1,699 $ 100% Soledad Canyon Corridor -$ 4,632$ - $ 131$ 4,763$ 2023-24 2028-29 4,763 $ 100% Railroad Avenue Corridor -$ 5,060$ - $ 69$ 5,129$ 2024-25 2027-28 5,129 $ 100% Bouquet Canyon Corridor -$ 5,381$ - $ 73$ 5,454$ 2023-24 2028-29 5,454 $ 100% Major Bridge and Thoroughfare Fees (B&T) 8,019,829$ 1,096,174$ (1,703,715)$ 741,883$ 8,154,170$ To provide for road and bridge infrastructure benefitting the specific district areas.

Bouquet Canyon B&T 1,582,155$ 30,593$ (115,884)$ 92,486$ 1,589,350$ Ongoing Ongoing Ongoing Eastside B&T (11,943,302)$ 67,733 $ (646,280)$ 58,400$ (12,463,449)$ Ongoing Ongoing Ongoing Via Princessa - Isabella Parkway to Golden Valley Rd. -$ 2024-25 2026-27 75,000,000 $ 35% Via Princessa B&T 5,931,676$ 99,696$ (232,315)$ 149,152$ 5,948,209$ Ongoing Ongoing Ongoing Dockweiler Drive Extension -$ 2024-25 2025-26 62,933,215 $ 44% Valencia B&T 10,064,291$ 898,152$ (709,237)$ 383,906$ 10,637,112$ Ongoing Ongoing Ongoing Bouquet 2nd Access 2,385,009$ - $ -$ 57,939$ 2,442,948$ Ongoing Ongoing Ongoing Interfund Transfer or Loans
No interfund transfers or loans were made between impact fee accounts in FY 22/23.

Page 2 of 14 ends

Exhibit A
City of Santa Clarita
Statement of Fire Facilities Mitigation Fee Program
Planned Expenditures and Changes in Fund Balance
% Funded with Amount Funded
Project Estimated StartTotal Project the Impact Fee with Impact Fee Name Date Cost Revenue Revenue
Fire Station No. 104
Construction
Complete and
Payments Ongoing
$14,438,698Reimbursement in
progress to 100%
Previously Paid $8,025,000
Future Fiscal Years $6,413,698
Upcoming Fire Stations As determined by LA County Fire City cost share up to 100% Five-Year Financial Summary
In Accordance with the City of Santa Clarita's Agreement with Los Angeles County to be part of the Consolidated Fire Protection District (Fire District), the City was required to adopt the Developer Fee Detailed Fire Station Plan. Fire District developer fees finance the construction of new/replacement fire stations and related fire protection improvements within the City. The fee is typically updated annually. The Fire District developer fee is charged on new residential buildings, new detached residential accessory structures, new commercial buildings, and residential or commercial additions over 2,000 square feet. The fee is collected at the time of building permit issuance. There is a reasonable relationship between the fee and its purpose because the fee is calculated to reflect the proportionate impact the development will have on fire safety facilities and service measured by the square footage of the development.

The fee is calculated in proportion to the developer’s impact of $1.5499 per square foot beginning July 1, 2023 as approved by City Council on April 11, 2023. It is consistent with the fees adopted by the Los Angeles County Board of Supervisors on January 31, 2023. Fees collected will be used to reimburse the Fire District for Fire Station 104 and future fire facilities when identified.

The Fire Facilities Mitigation Fee has a balance of $349,614. Pursuant to the Developer Fee Agreement (Agreement) No. 66785, citing the approval of the Board of Supervisors for the development of seven (7) fire stations to become operational in the Santa Clarita Valley, the City entered into a mutual agreement to reimburse the Fire District the proportional costs for developing new fire stations and purchasing apparatus with the intent to provide jurisdictional coverage within the City's boundary. As a condition of the agreed terms, the City is expected to reimburse the Fire District one hundred percent (100%) of the total development costs of Fire Station 104 to include and not limited to the apparatus purchase price, outfitting and communication costs, and all applicable firefighting and EMS equipment.

The City is permitted to retain a 5% admin fee for its collecting and transmitting of funds to LA County.

The estimated timing of reimbursement and cost of the project are shown below. The balance of the project cost will be fully funded with the Fire Facilities Mitigation Fee revenue.

Page 3 of 14 ends

Exhibit A
City of Santa Clarita
Five-Year Financial Summary
Statement of Law Enforcement Facilities Fee Program
Planned Expenditures and Changes in Fund Balance

% Funded withAmount Funded Other
Project Estimated StartTotal Project the Impact Fee with Impact Fee Funding Name Date Cost Revenue Revenue Sources
Santa Clarita Valley
Sheriff's Station
Construction
Completed and
Payments
Ongoing
$68,956,380 8% $3,380,328
City Bond Proceeds,
Facilities Fund,
Eastside B&T,
Federal and State
Drug Forfeiture
Funds, AQMD, Los
Angeles County
Contribution
Reimbursement in progress up to 100%
The purpose of the Law Enforcement Facilities Fee is to ensure new development pays its fair share for the capital costs associated with expanding and/or building law enforcement facilities to accommodate the growth in service population. There is a reasonable relationship between the fee and its purpose because the fee is calculated to reflect the proportionate impact the development will have on law enforcement facilities and service measured by the square footage of the development.

The Law Enforcement Facilities Fee has a balance of $40,542 and is intended to be utilized to fulfill law enforcement public facility needs.

As per the City's Schedule of Fees and Charges, Resolution 23-32, the amount of the fees established shall be reviewed annually by the City Council, in consultation with the Sheriff. Each year, the law enforcement facilities fee shall be adjusted based on the Consumer Price Index (CPI) as determined by the City Council.

Construction of the new Santa Clarita Valley Sheriff’s Station cost $68,956,380. The Law Enforcement Facilities Fee has contributed 8% to the project. The remaining balance of the project costs was funded with other revenue sources.

Page 4 of 14 ends

Exhibit A
City of Santa Clarita
Statement of Public Library Facilities and Technology Mitigation Fee Program Planned Expenditures and Changes in Fund Balance
% Funded withAmount Funded Other
Project Estimated StartTotal Project the Impact Fee with Impact FeeFunding Name Date Cost Revenue Revenue Sources
Library Facilities and
Technology Projects Ongoing $4,274,301 100% $4,274,301 Library Funds Library Facilities include public library improvements and public library services and community amenities, the need for which is directly or indirectly generated by a residential development project, including but not limited to acquiring, through constructing, altering, repairing, augmenting, equipping and furnishing real property, buildings, equipment, materials and other facilities for the conduct of public library services and programs; providing collection development and maintenance, including acquiring books, magazines, newspapers, audio- visual, electronic media, and other informational materials; and all other auxiliary work which may be required to carryout that work, such as administrative, engineering, architectural and legal work performed in connection with establishing, implementing and monitoring such projects, indirect costs, and other incidental expenses of providing those library facilities, or all or any combination thereof. (Ordinance No. 99-7 - 10/26/1999) The Library Facilities and Technology Mitigation fee will provide the additional funds necessary to provide the public library facilities required to accommodate the library needs generated by new residential developments.

The amount of fee is calculated in proportion to the residential living unit, as per the City's Schedule of Fees and Charges, Resolution 23-32. The amount of the fee is reviewed and adopted annually by the City Council.

The Library Facilities and Technology Mitigation Fee has a balance of $4,274,301 and is intended to fund public library improvements and public library services and community amenities.

Five-Year Financial Summary

Page 5 of 14 ends

Exhibit A
City of Santa Clarita
Five-Year Financial Summary
Statement of Transit Facilities Mitigation Fee Program
Planned Expenditures and Changes in Fund Balance
% Funded withAmount Funded Other
Project Estimated StartTotal Project the Impact Fee with Impact Fee Funding Name Date Cost Revenue Revenue Sources
Vista Canyon Transit ProjectsFY 26-27 Ongoing Ongoing $101,144 Purchase of Expansion Buses FY 25-26 $1,654,678 18% $299,333 Federal Grant,
Municipal
Operators
Service
Improvement
Program
The Transit Facilities Mitigation Fee will provide the funds necessary to provide transit facilities required to accommodate transit needs generated by new residential developments. The facilities include buses, vans, a bus yard, construction of bus pads and bus turn-outs, and commuter rail stations and facilities. (Resolution No. 91-154, 10/08/1991) The Transit Facilities Mitigation Fee has a balance of $400,477. Of this balance, $101,144 is earmarked towards projects at Vista Canyon. The remaining $299,333 will be used to purchase expansion buses in FY 25-26.

The amount of fee is calculated in proportion to the residential living unit, as per the City's Schedule of Fees and Charges, Resolution 23-32. The amount of the fee is reviewed and adopted annually by the City Council.

The estimated timing and cost of the projects are shown below. The balance of these projects are expected to be funded with the impact fee revenues as well as grants and other revenues as needed.

Page 6 of 14 ends

Exhibit A
City of Santa Clarita
Statement of Parking in Lieu Fee Program
Planned Expenditures and Changes in Fund Balance
% Funded with Amount Funded
Project Estimated Start Total Project the Impact Fee with Impact Fee Name Date Cost Revenue Revenue
Old Town Newhall Parking
Structure
Ongoing
Evaluation
Ordinance 17-16
12/12/2017
Ongoing
Evaluation 100% $91,995
Old Town Newhall Parking is evaluated on an ongoing basis and will be constructed when needed. Municipal Code

17.51.10, subdivision G states payment of the fee does not represent an obligation of the City to make available parking spaces within any particular amount of time. (Ord. 17-16§ 1, 12/12/17) The fee is calculated per parking space for new construction or expanded square-footage. The fee is reviewed on a regular basis, no less than every five (5) years from the date of the first deposit into the parking in lieu fee fund. The fee per parking stall is $5,855.10. The fee may be adjusted periodically to account for known cost conditions. (Ordinance 17-16, 12/12/17)
The Parking in Lieu Fee has a balance of $ 91,995 and will be used to finance the creation or expansion of public parking through the purchase of property and the construction of new facilities. The Parking in Lieu Fee may be used to fund debt service and signage that identifies the location of parking within the business district.

The Parking in Lieu Fee implements the goals and policies of the Old Town Newhall Specific Plan, which is the guiding land use and vision document for the development and redevelopment of Main Street and the Old Town Newhall area. The Parking in Lieu Fee will mitigate adverse impacts to the business community due to inadequate parking by establishing a funding source to pay for parking facilities within the Old Town Newhall Specific Plan area.

Five-Year Financial Summary

Page 7 of 14 ends

Exhibit A
City of Santa Clarita
Statement of Oak Tree Impact Fee Program
Planned Expenditures and Changes in Fund Balance
% Funded with Amount Funded
Project Estimated StartTotal Project the Impact Fee with Impact Fee Name Date Cost Revenue Revenue
Heritage Oak Preservation and
Propagation Plan 1/1/2024 $56,700 100% $56,700
Oak Tree Preservation Projects Ongoing
Evaluation $91,746 100% $91,746
The purpose of the City's Oak Tree Preservation Ordinance is to protect and preserve oak trees in the City and to provide regulatory measures designed to accomplish the purpose. The regulatory measures include: No person shall cut, prune, remove, relocate, endanger, damage or encroach into the protected zone of any oak tree on any public or private property within the city except in accordance with the conditions of a valid oak tree permit issued by the City.

Any person or applicant shall be required to furnish all necessary requirements as determined by the City's Department Director, in conjunction with the City's oak tree arborist as necessary, for evaluation and to monitor strict compliance to this policy. (Ordinance No. 89-10)
The Oak Tree Preservation Fee has a balance of $148,445.59. The collected fees shall be utilized to further the preservation and regeneration of oak trees, the identification and official designation of heritage oaks, the purchase, monitoring and ongoing maintenance of oak trees, landscaping and other habitat refurbishment, and for educational and informational programs related to oak trees and their preservation. As an alternative to the payment of all or a portion of the fees described above, an applicant may also be credited with the value of any accepted dedications of property within the City which are suitable for the planting and survival of oak trees. Fees imposed under this section may be reduced as mitigated by specific circumstances and corrective measures undetected by the property owner.

The fee is reviewed annually and is included in the City's Schedule of Fees and Charges. (Resolution 23-32) The estimated timing and cost of the Oak Tree Preservation projects are shown below. A total of $56,700 will be utilized for the heritage oak tree preservation and propagation plan in Fiscal Year 23-24 and the remaining balance of $91,746 will finance the ongoing oak tree preservation efforts as needed. The entire costs of the Oak Tree Preservation projects are expected to be funded with the Oak Tree Mitigation Fee revenue.

Five-Year Financial Summary

Page 8 of 14 ends

Exhibit A
City of Santa Clarita
Five-Year Financial Summary
Statement of Site Improvements Fee Program
Planned Expenditures and Changes in Fund Balance
Utility Undergrounding:

Park Improvements:
% Funded with Amount Funded Other
Project Estimated Start Total Project the Impact Fee with Impact Fee Funding Name Date Cost Revenue Revenue Sources
Utility Undergrounding
Soledad Canyon
Ongoing Evaluation
To be Completed with Larger
Segment.
$16,500,000 2% $300,000 Facilities Fund
Kansas Street
Ongoing Evaluation
To be Completed with Larger
Segment.
$263,736 100% $263,736
Park Improvements Ongoing Evaluation $250,000 100% $250,000 Needham Ranch Trail Ongoing Evaluation $242,680 27% $66,019 General Fund, OSPD
Developer contributions to be used to connect and refurbish the surrounding trail systems into a single, connected trail system.

The estimated timing and cost of the projects are shown below. The project is expected to be funded with site improvement revenues as well as with Open Space Preservation District (OSPD), Facilities and General Fund.

Needham Ranch Trail:

At permit issuance or other grants of approval, the developer agrees to develop the property in accordance with City codes and other appropriate ordinances such as, Building code, Plumbing Code, Grading Code, Highway Permit Ordinance, Mechanical Code, Unified Development Code, Undergrounding of Utilities Ordinance, Sanitary Sewer and Industrial Waste Ordinance, Electrical Code, and Fire Code. The developer also agrees to various conditions of approval for various community improvements. Prior to the issuance of building permits, building final, or in accordance with the approved conditions of approval, the developer pays to the City their contribution towards their fair share of the costs.

As of June 30, 2023, there is a $582,149 balance in the Site Improvement Fee account. The City is utilizing the balance for the following site improvement projects:
- Soledad Canyon: To underground utilities in a two-mile section of Soledad Canyon Road between Bouquet Canyon Road and Valley Center Drive.
- Kansas Street : To underground new and existing power lines and overhead cables less than 34 KV within or fronting the project site along Kansas Street between Lyons Avenue and Oak Street.

Per Conditions of Approval, fees were collected as a City Council condition and the funds are to be used as determined by the City.

Page 9 of 14 ends

Exhibit A
City of Santa Clarita
Planned Expenditures and Changes in Fund Balance
- Bridge Widening Copper Hill Drive
- Vista Canyon Road Bridge - Design
% Funded withAmount Funded
Project Estimated StartTotal Project the Impact Fee with Impact Fee Name Date Cost Revenue Revenue
Bridge Widening Copper Hill
Drive 1/1/2024 $4,000,000 100% $4,000,000
Vista Canyon Road Bridge -
Design 8/9/2021 $350,000 100% $350,000
Five-Year Financial Summary
The estimated timing and cost of the projects are shown below. The balance of these projects are expected to be fully funded with the Street Infrastructure Fee Revenue.

The purpose of the Street Infrastructure Fee is to mitigate adverse impacts due to the inadequacy of public roads and thoroughfares within the community that might otherwise occur due to new residential development.

The Street Infrastructure Fee has a balance of $554,575. The City anticipates utilizing this balance for the following projects:

This project will provide for design peer review and construction oversight of the developer funded/constructed project to widen the Copper Hill Drive bridge over San Francisquito Creek. The project will widen the bridge to include three lanes in each direction, median, barrier separated sidewalk and bicycle facilities, and associated improvements on the roadway approaches.

This project will provide a bridge over the Santa Clara River and street improvements on Soledad Canyon Road at Lost Canyon and within limits of Vista Canyon development. Design contract completion is contingent on the developer's schedule.

Statement of Street Infrastructure Fee Program

Page 10 of 14 ends

Exhibit A
City of Santa Clarita
% Funded withAmount Funded Other
Project Estimated Start Total Project the Impact Fee with Impact Fee Funding Name Date Cost Revenue Revenue Sources
Annual Sidewalk Program FY 24-25 $600,000 5% $28,627 Measure R Prior to building final, the developer is required to replace abandoned driveways with standard curb, gutter, sidewalk, and pavement in accordance with APWA standards, to the satisfaction of the City. A revised street plan and encroachment permit shall be required. The developer is also required to repair any broken or damaged curb, gutter and sidewalk, and refurbish the half section of pavement on streets within or abutting the project, to the satisfaction of the City.

The Sidewalk Infrastructure Fee has a balance of $28,627, which represents the total of accumulated interest income in the account. The City will utilize this balance to fund sidewalk projects next fiscal year.

Five-Year Financial Summary
Statement of Sidewalk Infrastructure Fee Program
Planned Expenditures and Changes in Fund Balance
The purpose of the Sidewalk Infrastructure Fee is to mitigate the impacts of development projects on the sidewalk infrastructure. Developers contribute to the upkeep and improvement of sidewalks in the areas where their projects are undertaken.

As per Conditions of Approval, prior to issuance of building permits, the developer is required to dedicate sidewalk easements sufficient to encompass American Disabilities Act (ADA) requirements for sidewalks installed with drive approaches per the current City standard American Public Works Association (APWA) 110-1, Type C, or equivalent.

Page 11 of 14 ends

Exhibit A
City of Santa Clarita
Statement of Medians Fee Program
Planned Expenditures and Changes in Fund Balance
-Circulation Improvements of Valley Center Drive
- Sierra Highway Medians
% Funded with Amount Funded
Project Estimated StartTotal Project the Impact Fee with Impact Fee Name Date Cost Revenue Revenue
Circulation Improvements of
Valley Center Drive 1/3/2023 $225,887 100% $225,887
Sierra Highway Medians FY 29-30 $460,998 100% $460,998
Five-Year Financial Summary
The estimated timing and cost of the projects are shown below. The balance of the projects cost are expected to be fully funded with the Median Fee.

This project provides for the construction of traffic circulation improvements which include median revisions, re- striping, landscape and irrigation, and traffic signal modifications.

This project provides for the landscaping and irrigation of the medians on Sierra Highway along the frontage of the project site.

The purpose of the Median Fee is to mitigate the impacts of development projects on landscape medians.

The Medians Fee has a balance of $686,885. The City will fund the following projects with this balance:

As per Conditions of Approval, prior to issuance of the first building permit, the developer shall pay an in-lieu fee for landscaping and irrigation of the medians on the project site. The in-lieu fee shall be based on a cost estimate calculated by the developer and approved by the City.

Page 12 of 14 ends

Exhibit A
City of Santa Clarita
Statement of Traffic Signal Timing Fees Program
Planned Expenditures and Changes in Fund Balance
% Funded withAmount Funded
Project Estimated StartTotal Project the Impact Fee with Impact Fee Name Date Cost Revenue Revenue
Newhall Avenue Corridor FY 24-25 $1,699 100% $1,699
Soledad Canyon Corridor FY 23-24 $4,763 100% $4,763
Railroad Avenue Corridor FY 23-24 $5,129 100% $5,129
Bouquet Canyon Corridor FY 24-25 $5,454 100% $5,454
As a condition of building occupancy permit issuance, the developer is required to update the traffic signal timing at all signalized locations determined by the City to experience significant changes in vehicular volumes and/or travel patterns as a result of the development.

There is a balance of $17,045 in the Traffic Signal Timing Fee fund, which is expected to be used to fund improvements to traffic signal timing in the City.

The fee is calculated in proportion to the developer's impact on the location as per the City's Schedule of Fees and Charges, Resolution 23-32. The amount of the fee is reviewed and adopted annually by the City Council.

The estimated timing and cost of the projects are shown below. The balance of the projects cost are expected to be fully funded with the traffic signal timing fee revenue.

Five-Year Financial Summary

Page 13 of 14 ends

Exhibit A
City of Santa Clarita
Statement of Major Bridge and Thoroughfare Fees Program Planned Expenditures and Changes in Fund Balance
% Funded withAmount Funded Other
Project Estimated StartTotal Project the Impact Fee with Impact Fee Funding Name Date Cost Revenue Revenue Sources
Via Princessa Extension -
Isabella Parkway to Golden
Valley Rd.

FY 24-25 75,000,000$ 35%
As cash is available.

Cash as of 6/30/23:
$3,599,515
Grant,
TDA Article 8
Dockweiler Drive
Extension FY 24-25 62,933,215$ 44%
As cash is available.

Cash as of 6/30/23:
$5,183,873
Grant,
TDA Article 8
As a condition of final map approval for property within an area of benefit, or a building permit developer, as a condition of a building permit issuance for property within an area of benefit, is required to pay a fee to defray the cost of constructing bridges over waterways, railways, freeways, and canyons, and/or constructing major thoroughfares. The provisions for payment of a fee only applies if the bridge and/or major thoroughfare has been included in an element of the General Plan adopted by the Council at least thirty (30) days prior to the filing of a map or application for a building permit on land located within the boundaries of the area of benefit.

There is a balance of $8,154,170 in the Major Bridge and Thoroughfare Fee, which is expected to be used to fund the construction of bridges and/or thoroughfares within benefit areas.

The fee is calculated per Factored Development Unit (FDU) as per the City's Schedule of Fees and Charges, Resolution 23-32. The amount of the fee is reviewed and adopted annually by the City Council.

The estimated timing and cost of the projects are shown below. Project costs are expected to be funded with the impact fee revenue, as well as grants and TDA Article 8 funds.

Five-Year Financial Summary