Cities Index.
Bid Proposal for Sully-Miller Contracting Company (available in the City Clerk's Reading File)

Santa Clarita City Council
May 28, 2024

Document
Bid Proposal for Sully-Miller Contracting Company (available in the City Clerk's Reading File)
Meeting
May 28, 2024
Body
Santa Clarita City Council
Original file
7.8 MB
Text extracted from the city's file for reading and search. Open the original on santaclaritacityca.iqm2.com. That file is the official record.

DOCUMENT CHECKLIST
Bid #CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. MO153
City of Santa Clarita, California
The following documents must be completed and submitted by the bidder as per the outlined timeframes.

The following documents must be provided by ALL bidders:

Uploaded via BidNet (see Section C)
@ Proposal Form
$ Notice to Bidders Regarding Contractual Requirements
Bid Schedule
Alternate Bid Schedule
Bid Summary
Bidder's Information and Certification
Bidder's Questionnaire
Certification of Non-Segregated Facilities
Designation of Subcontractors
References
Iran Contracting Act Certification
Non-Collusion Affidavit
All signed addendums (if any) - Digitally acknowledged on BidNet in addition to uploaded via BidNet
Delivered to City Hall, Attn: Purchasing, Suite 120 prior to bid closing:
• Proposal Guarantee Bond/Bidder's Bond (Notarized)
The following documents must be provided by the AWARDEE ONLY (With Agreement) Delivered to City Hall, Attn: Ramiro Fuentes
• Capital Improvement Project Agreement
Faithful Performance Bond (Notarized)
Labor & Material Bond (Notarized)
Insurance Required by Contract
Fringe Benefit Statement

SECTION C
Bid Submittals

PROPOSAL FORM
Bid #CIP-23-24-M0153OD
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
TO THE CITY OF SANTA CLARITA, AS CITY:

In accordance with CITY's NOTICE INVITING BIDS, the undersigned BIDDER hereby proposes to furnish all materials, equipment, tools, labor, and incidentals required for the above-stated project as set forth in the plans, specifications, and contract documents therefore, and to perform all work in the manner and time prescribed therein.

BIDDER declares that this proposal is based upon careful examination of the work site, plans, specifications, INSTRUCTIONS TO BIDDERS, and all other contract documents. If this proposal is accepted for award, BIDDER agrees to enter into a contract with CITY at the unit and/or lump sum prices set forth in the following BID SCHEDULE. BIDDER understands that failure to enter into a contract in the manner and time prescribed will result in forfeiture to CITY of the proposal guarantee accompanying this proposal.

BIDDER understands that a bid is required for the entire work that the estimated quantities set forth in BID SCHEDULE are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. THE CITY RESERVES THE RIGHT TO INCREASE OR DECREASE THE AMOUNT OF ANY QUANTITY SHOWN AND TO DELETE ANY ITEM FROM THE CONTRACT. It is agreed that the unit and/or lump sum price(s) bid include all appurtenant expenses, taxes, royalties, and fees for the project's duration. In case of discrepancies in the amounts bid, unit prices shall govern over extended amounts, and words shall govern over figures.

If awarded the contract, the undersigned further agrees that in the event of the Bidder's default in executing the required contract and filing the necessary bonds and insurance certificates within ten working days after the date of the CITY's notice of award of contract to the BIDDER, the proceeds of the security accompanying this bid shall become the property of the CITY and this bid and the acceptance hereof may, at the CITY's option, be considered null and void.

Company Name: Sully-Miller Contracting Company
Company Address: 135 S. State College Blvd., Suite 400
Brea CA 92821
Phone: 714-578-9600
Email: [email protected]
By: Jeff Galterio
Print Name • OR
Title: Assistant, Secretary 0,02
Signature: WYatteria
Date: April 9, 2024
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document State of California
County of Orange
On April 09, 2024 before me, — Monica Baldacci, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

MONICA MARIE BALDACCI K
COMMISSION #2447801
Notary Public - California WITNESS my hand and official seal.

ORANGE COUNTY
My Commission Expires
MAY 25, 2027 NoBi
Signature
Signature of Notary Public
Monica Baldacci, Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Proposal Form Document Date: April 9, 2024 Number of Pages: 1 _ Signers) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:
* Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: Signer Is Representing:

Sully-Miller Contracting Company
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907

NOTICE TO BIDDERS REGARDING CONTRACTUAL REQUIREMENTS
Bid #CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California

SUMMARY OF INDEMNITY AND INSURANCE REQUIREMENTS

1. These are the Indemnity and Insurance Requirements for Contractors providing services or supplies to City of Santa Clarita (City). By agreeing to perform the work or submitting a proposal, you verify that you comply with and agree to be bound by these requirements. If any additional Contract documents are executed, the actual indemnity language and Insurance Requirements may include additional provisions Questions and requests for modification of these terms must be negotiated and approved prior to bid submission and are at the full discretion of the City.

2. You should check with your Insurance advisors to verify compliance and determine if additional coverage or limits may be needed to adequately insure your obligations under this agreement. These are the minimum required and do not in any way represent or imply that such coverage is sufficient to adequately cover the Contractor's liability under this agreement. The full coverage and limits afforded under Contractor's policies of Insurance shall be available to Buyer and these Insurance Requirements shall not in any way act to reduce coverage that is broader or includes higher limits than those required.

The Insurance obligations under this agreement shall be: 1—all the Insurance coverage and limits carried by or available to the Contractor; or 2-the minimum Insurance requirements shown in this agreement, whichever is greater. Any insurance proceeds in excess of the specified minimum limits and coverage required, which are applicable to a given loss, shall be available to City.

3. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements and a copy of the Declarations and Endorsement Page of the CL policy listing all policy endorsements to City before work begins. City reserves the right to require full-certified copies of all Insurance coverage and endorsements.

I. INDEMNIFICATION:

City and its respective elected and appointed boards, officials, officers, agents, employees, and volunteers (individually and collectively, "Indemnitees") shall have no liability to CONTRACTOR or any other person for, and CONTRACTOR shall indemnify, defend, protect, and hold harmless Indemnitees from and against, any and all liabilities, claims, actions, causes of action, proceedings, suits, damages, judgments, liens, levies, costs, and expenses of whatever nature, including reasonable attorney's fees and disbursements (collectively, "Claims"), which Indemnitees may suffer or incur or to which Indemnitees may become subject by reason of or arising out of any injury to or death of any person(s), damage to property, loss of use of property, economic loss, or otherwise occurring as a result of or allegedly caused by the CONTRACTOR'S performance of or failure to perform any services under this Agreement, or by the negligent or willful acts or omissions of CONTRACTOR, its agents, officers, directors, or employees, committed in performing any of the services under this Agreement.

If any action or proceeding is brought against Indemnitees by reason of any of the matters against which CONTRACTOR has agreed to indemnify Indemnitees as provided above, CONTRACTOR, upon notice from City, shall defend Indemnitees at its expense by counsel acceptable to City, such acceptance not to be unreasonably withheld. Indemnitees need not have first paid for any of the matters to which Indemnitees are entitled to indemnification in order to be so indemnified. The limits of the insurance required to be maintained by CONTRACTOR in this Agreement shall not limit the liability of CONTRACTOR hereunder. The provisions of this section shall survive the expiration or earlier termination of this agreement.

The provisions of this section do not apply to Claims occurring as a result of the City's active negligence or acts of omission.

II. INSURANCE
CONTRACTOR shall maintain and submit certificates of all applicable insurance including, but not limited to, the following and as otherwise required by law. The terms of the insurance policy or policies issued to provide the above insurance coverage shall provide that said insurance may not be amended or canceled by the carrier, for non-payment of premiums or otherwise, without thirty (30) days prior written notice of amendment or cancellation to the CITY. In the event the said insurance is canceled, the CONTRACTOR shall, prior to the cancellation date, submit to the City Clerk new evidence of insurance in the amounts established.

Liability Insurance
During the entire term of this Agreement, the CONTRACTOR agrees to procure and maintain General Liability insurance at its sole expense to protect against loss from liability imposed by law for damages on account of bodily injury, including death therefrom, suffered or alleged to be suffered by any person or persons whomsoever, resulting directly or indirectly from any act or activities, errors or omissions, of the CITY, or CONTRACTOR or any person acting for the CITY, or under its control or direction, and also to protect against loss from liability imposed by law for damages to any property of any person caused directly or indirectly by or from acts or activities of the CITY, or CONTRACTOR or any person acting for the CITY, or under its control or direction. Such public liability and property damage insurance shall also provide for and protect the CITY against incurring any legal cost in defending claims for alleged loss. Such General, Public and Professional liability and property damage insurance shall be maintained in full force and effect throughout the term of the Agreement and any extension thereof in the amount indicated above or the following minimum limits:

Commercial General Liability Insurance, including coverage for Premises and Operations, Contractual Liability, Personal Injury Liability, Products/Completed Operations Liability, and Independent Contractors' Liability (if applicable), in an amount of not less than two million dollars ($2,000,000.00) per occurrence, four million dollars ($4,000,000.00) annual aggregate, written on an occurrence form.

Products/Completed Operations coverage shall extend a minimum of three (3) years after project completion. Coverage shall be included on behalf of the CONTRACTOR for covered claims arising out of the actions of independent contractors. If the CONTRACTOR is using subcontractors, the policy must include work performed "by or on behalf" of the CONTRACTOR. Policy shall contain no language that would invalidate or remove the CONTRACTOR'S duty to defend or indemnify for claims or suits expressly excluded from coverage. Policy shall specifically provide for a duty to defend on the part of the CONTRACTOR.

Worker's Compensation Insurance
The CONTRACTOR shall procure and maintain, at its sole expense, Worker's Compensation Insurance in the amount of $1,000,000 per occurrence or in such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and provide legal defense for both the CONTRACTOR and the CITY against any loss, claim or damage arising from any injuries or occupational diseases happening to any worker employed by the CONTRACTOR in the course of carrying out the work within the Agreement. Such insurance shall also contain a waiver of subrogation naming the City of Santa Clarita.

Automotive Insurance
The CONTRACTOR shall procure and maintain, at its sole expense, throughout the term of this Agreement, and any extension thereof, public liability and property damage insurance coverage for automotive equipment with coverage limits of not less than $1,000,000 combined single limit for each accident. All such insurance shall be primary insurance and shall name the City of Santa Clarita as an additional insured.

Builder's Risk
Upon commencement of construction and with approval of CITY, CONTRACTOR shall obtain and maintain Builder's Risk Insurance for the entire duration of the Project until only the CITY has an insurable interest.

The Builder's Risk coverage shall include the coverages as specified below:

The named insureds shall be CONTRACTOR and CITY, including its officers, officials, employees, and agents. All subcontractors (excluding those solely responsible for design work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to CITY.

The policy shall contain a provision that all proceeds from the Builder's Risk Policy shall be made payable to the CITY. The CITY will act as a fiduciary for all other interests in the Project.

Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project.

There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include:
(1) coverage for any ensuing loss from faulty workmanship, nonconforming work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the site or any staging area. Such insurance shall be on a form acceptable to CITY to ensure adequacy of terms and sub-limits and shall be submitted to the CITY prior to commencement of construction.

Fire and Extended Coverage Insurance (Services involving real property only) CONTRACTOR agrees to procure and maintain, at its sole expense, during the term of this Agreement, and any extension thereof, a policy of fire, extended coverage and vandalism insurance.

Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions Contractors Pollution Liability and/or Asbestos Pollution Liability and/or Errors & Omissions with limit no less than $2,000,000 per claim or occurrence and $2,000,000 aggregate per policy period of one year.

Coverage must be included for bodily injury and property damage, including coverage for loss of use and/or diminution in property value, and for clean-up costs arising out of, pertaining to, or in any way related to the actual or alleged discharge, dispersal, seepage, migration, release or escape of contaminants or pollutants, arising out of or pertaining to the services provided by CONTRACTOR under this Agreement, including the transportation of hazardous materials or contaminants.

Professional Liability (if Design-Build)
Professional Liability Insurance, insuring against professional errors and omissions arising from CONTRACTOR'S work on the Project, in an amount not less than [$2,000,000] combined single limit for each occurrence. If CONTRACTOR cannot provide an occurrence policy, CONTRACTOR shall provide insurance covering claims made as a result of performance of work on this Project and shall maintain such insurance in effect for not less than three years following final completion of the Project.

Waiver of Subrogation
All insurance coverage maintained or procured pursuant to this Agreement shall be endorsed to waive subrogation against the CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against the CITY, and shall require similar written express waivers and insurance clauses from each of its subconsultants.

Separation of Insureds
A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR'S insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the insurer's limits of liability. The policy(ies) shall not contain any cross-liability exclusions.

Pass Through Clause
CONTRACTOR agrees to ensure that its subconsultants, subcontractors, and any other party involved with the project who is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. CONTRACTOR agrees that upon request, all Agreements with consultants, subcontractors, and others engaged in the project will be submitted to the CITY for review.

Self-Insured Retentions
Any self-insured retentions must be declared to and approved by the CITY. The CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by the CITY.

Primary and Additional Insured
All of such insurance shall be primary and shall name the City of Santa Clarita as additional insured. A Certificate of Insurance and an additional insured endorsement (for general and automobile liability), evidencing the above insurance coverage with a company acceptable to the City's Purchasing Agent shall be submitted to the CITY prior to execution of this Agreement on behalf of the CITY.

Requirements
Should CONTRACTOR, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain coverage at CONTRACTOR'S expense and deduct the cost of such insurance from payments due to CONTRACTOR under this Agreement or terminate. In the alternative, should CONTRACTOR fail to meet any of the insurance requirements under this Agreement, CITY may cancel the Agreement immediately with no penalty.

Should CONTRACTOR'S insurance required by this Agreement be canceled at any point prior to expiration of the policy, CONTRACTOR must notify CITY within 24 hours of receipt of notice of cancelation.

Furthermore, CONTRACTOR must obtain replacement coverage that meets all contractual requirements within 10 days of the prior insurer's issuance of notice of cancelation. CONTRACTOR must ensure that there is no lapse in coverage.

If the operation under this Agreement results in an increased or decreased risk in the opinion of the City's Purchasing Agent, then the CONTRACTOR agrees that the minimum limits herein above designated shall be changed accordingly upon request by the City's Purchasing Agent.

The CONTRACTOR agrees that provisions of this paragraph as to maintenance of insurance shall not be construed as limiting in any way the extent to which the CONTRACTOR may be held responsible for the payment of damages to persons or property resulting from the CONTRACTOR'S activities or the activities of any person or persons for which the CONTRACTOR is otherwise responsible.

I have read and understand the above requirements and agree to be bound by them for any work performed for the City.
mate on Teff Satian Date: April 9, 2024
Printed Name: Jeff Galterio
Assistant Secretary
: 5+

BID SCHEDULE
Bid #CIP-23-24-MO1530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
Fill out this form completely and submit with the bid response. Line item pricing must be entered on BidNet. In the event any mathematical discrepancies are found, please refer to Section B, Bid Instructions.

The AGENCY also reserves the right to add/delete the quantities to the existing bid items, or delete the entire bid item if they are found not required by the Agency during the course of the construction, or add new bid items or scope of work by Contract Change Order at any time during the project up to the last contract working day.

The BIDDER agrees to hold all unit prices in this Bid Schedule constant throughout the duration of the project up to the last contract working day.

ITEM QTY
NO. DESCRIPTION UNIT UNIT PRICE TOTAL
1 Mobilization, Bonds & Insurance 1 LS
$ 620,000.00 $ 620,000.00
2 Traffic Control 1 LS $ 550,000.00 550,000.00
$
3 Storm Water Pollution Control Program 1 LS $ 15,000
$ 15,000
4 AC D2 PG 64-10 1348 TN $ 191.00 257,468.00
$
5 ARHM GG-D PG 64-16 4735 TN $ 166.00 786,010.00
$
6 AC C2 PG 64-10 12555 TN $137.00
$ 1,720,035.00
7 Cold Plane & Remove 2-1/2" 224398 SF $ 0.85 $ 190,738.30 8 Cold Plane & Remove 14-1/2" 167389 SF $ 5.00 $ 836,945.00 9 Micromill Concrete and Concrete Overlay 69523 SF
to a Depth of 1/2" $ 0.75 $ 52,142.25
10 Place Polyester Concrete Overlay 3/4" 4345 CF $ 220.00 $ 955,900.00 11 Remove & Replace 4" AC 33660 SF $ 8.91 $ 299,910.60
12 Remove and Replace Concrete (Allowance) 2000 SF $ 40.00 $ 80,000.00 13 Install Blue RPM's @ Fire Hydrant 24 EA $ 7.75 $ 186.00 14 Lower Manhole Covers to Finish Grade EA $ 600.00 15,000.00 $
15 Lower Gas Covers to Finish Grade 1 EA $ 500.00 $ 500.00 16 Lower Water Valve Covers to Finish Grade 23 EA $ 500.00 .11,500.00 $
Adjust Manhole Covers to Finish Grade 25 EA $ 610.00 $ 15,250.00 18 Adjust Gas Covers to Finish Grade 1 EA $ 505.00 $ 505.00 19 Adjust Water Valve Covers to Finish Grade 23 EA $ 505.00 $ 11,615.00
Remove and Install Permanent Traffic 39 EA
Loops $ 460.00 $ 17,940.00
21 Install Temporary Video Detection System EA $ 7,200.00 28,800.00 $
22 Remove and Install Traffic Nodes 12 EA $ 1,750.00 $ 21,000.00 23 12" White Crosswalk/Limit Line (Thermo) 1290 LF $ 3.60 4,644.00 $
24 | Striping Detail #9 (Thermo & Markers) 2185 LF $ 0.85 1,857.25 $
25 | Striping Detail #13 (Thermo) 14101 LF
$ 0.95 $ 13,395.95
26 Striping Detail #24 (Thermo & Markers) 5809 LF $ 0.85 4,937.65 $
27 Striping Detail #27B (Thermo) 1783 LF
$ 0.85 $ 1,515.55
28 Striping Detail #38A (Thermo) 8749 LF $ 1.00 : 8,749.00 $
29 Striping Detail #39 (Thermo) 862 LF $ 0.85 732.70
$
30 Arrow Type I (10') (Thermo) 6 EA $ 90.00 540.00
$
31 Arrow Type I (18') (Thermo) 3 EA
$ 100.00 $ 300.00
32 Arrow Type IV (L/R) (Thermo) 45 EA $ 77.00
$ 3,465.00
33 Legend "NO" (Thermo) 2 EA
$ 103.00 $ 206.00
34 Legend "TRUCKS" (Thermo) 2 EA $ 310.00 $ 620.00
•
TOTAL BASE BID AMOUNT: $ 6,527,408.25
TOTAL BASE BID AMOUNT IN WORDS: Six Million Five Hundred Twenty-Seven Thousand Four Hundred Eight Dollars and Twenty-Five Cents

ALTERNATE BID SCHEDULE
Bid #CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
Do NOT include this pricing in the total base bid amount. Fill out this form completely and upload it with your bid. In the event any mathematical discrepancies are found in the pricing forms submitted, the unit price shall govern. Do NOT enter this pricing on BidNet.

The AGENCY also reserves the right to add/delete the quantities to the existing bid items, or delete the entire bid item if they are found not required by the Agency during the course of the construction, or add new bid items or scope of work by Contract Change Order at any time during the project up to the last contract working day.

The BIDDER agrees to hold all unit prices in this Alternate Bid Schedule constant throughout the duration of the project up to the last contract working day.

ITEM
DESCRIPTION aTY UNIT UNIT PRICE TOTAL
NO.
1 Mobilization, Bonds & 1 LS
Insurance $ 200,000 $ 200,000
2 Traffic Control 1 LS
$ 150,000 $ 150,000
Storm Water Pollution 1 LS
Prevention - BMP Plan $ 15,000 $ 15,000
4 AC D2 PG 64-10 1,379 TN $ 275,800
$ 200
5 ARHM GG-D PG 64-16 4,845 TN
$ 148 $ 717,060
6 Remove & Replace 6" AC 37,521 SF $ 7.50 $ 281,407.50
7 Remove Roots Under Concrete 3,201 SF
or Pavement Repairs $ 10.50 $ 33,610.50
8 Cold Plane & Remove 2-1/2" 400,943 SF
$.85 $ 340,801.55
9 Lower Manhole Covers to Finish 14 EA
Grade $600 $ 8,400
10 Lower Water Valve Covers to 14 EA
Finish Grade $ 500 $ 7,000
11 Lower Gas Valve Covers to 2 EA
Finish Grade $ 500 $ 1000
12 Adjust Manhole Covers to Finish 14 EA
Grade $ 610 $ 8,540
13 Adjust Water Valve Covers to 14 EA
Finish Grade $ 505 $ 7,070
14 Adjust Gas Valve Covers to 2 EA
Finish Grade $ 505 $ 1,010
15 Install Blue RPM's @ Fire 19 EA
Hydrant $ 8 $ 152
16 6" YELLOW Line (Thermo) 67 LF
$.85 $ 56.95
17 12" White Crosswalk/Limit Line 1,893 LF
(Thermo) $ 3.75 $ 7,098.75
18 Striping Detail #12 (Thermo & 9,809 LF
Markers) $.85 $ 8,337.65
19 Striping Detail #24 (Thermo) 7,305 LF $ 6,209.25
$.85
20 Striping Detail #27B (Thermo) 455 LF
$.85 $ 386.75
21 Striping Detail #37B (Thermo & 1,095 LF
Markers) $ 1 $ 1,095
22 Striping Detail #38 (Thermo & 2,878 LF
Markers) $1 $ 2,878
23 Striping Detail #38A (Thermo) 1,658 LF
$1 $ 1,658
24 Striping Detail #38C (Markers) 250 LF
$4.10 $ 1,025
25 Striping Detail #39A (Thermo) 1,095 LF
$ .80 $ 876
26 6 striping Deal 40 (Thermod 1,334 LF
Markers) $ 2.60 $ 3,468.40
27 Chevron Striping 128 LF $ 3.60 $ 460.80
28 Arrow Type IV (L/R) (Thermo) 30 EA $ 80
$ 2,400
29 "KEEP" Legend (Thermo) 6 EA $ 205 $ 1,230
30 "CLEAR" Legend (Thermo) 6 EA
$ 260 $ 1,560
31 Install Temporary Video 5 EA
Detection System $7,200 $ 36,000
32 Remove and Install Permanent 65 EA
Traffic Loops $ 460 $ 29,900
TOTAL ALTERNATE BID AMOUNT: |$2,151,492.10
TOTAL ALTERNATE BID AMOUNT IN WORDS: Iwo Million, One Hundred fifty one thousand four hundred ninety-two dollar & ten cents.

BID SUMMARY
Bid #CIP-23-24-MO1530D
2023-24 Annual Overlay D Project
City Project No. MO153
City of Santa Clarita, California

BID SUMMARY

TOTAL PRICE
6,527,408.25

IN FIGURES

BASE BID
TOTAL PRICE IN ix Million five hundred twenty seven thousand four hundred eigh WORDS lollars & twenty five cent

TOTAL PRICE
$ 2,151,492.10

ALTERNATE IN FIGURES
BID
TOTAL PRICE IN Iwo Million, One Hundred fifty one thousand WORDS
four hundred ninety-two dollar & ten cents.

TOTAL OF TOTAL PRICE
BASE BID $ 8,678,900.35

IN FIGURES
PLUS
ALTERNATE TOTAL PRICE IN ne dared revan eight thousand

BID WORDS

BIDDER'S INFORMATION AND CERTIFICATION
Bid #CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, CA
Bidder certifies that the representations of the bid are true and correct and made under penalty of perjury.

EQUAL EMPLOYMENT OPPORTUNITY COMPLIANCE
Bidder certifies that in all previous contracts or subcontracts, all reports which may have been due under the requirements of any CITY, State, or Federal equal employment opportunity orders have been satisfactorily filed, and that no such reports are currently outstanding.

AFFIRMATIVE ACTION CERTIFICATION
Bidder certifies that affirmative action has been taken to seek out and consider minority business enterprises for those portions of the work to be subcontracted, and that such affirmative actions have been fully documented, that said documentation is open to inspection, and that said affirmative action will remain in effect for the life of any contract awarded hereunder. Furthermore, Bidder certifies that affirmative action will be taken to meet all equal employment opportunity requirements of the contract documents.

CERTIFICATION REGARDING DIR CONTRACTOR/SUBCONTRACTOR REGISTRATION By my signature hereunder, as the Contractor, I certify that Contractor, and all Subcontractors listed on the Subcontractor Designations form are the subject of current and active contractor registrations pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code. Contractor's registration number is indicated below. Subcontractors' registration numbers are indicated on the Subcontractor Designations form.

Bidder's Name: Sully-Miller Contracting Company
Business Address: 135 S. State College Blvd, Suite 400, Brea. CA 92821 Telephone No.: 714-578-96000
State CONTRACTOR's License No. & Class: 747612-A
DIR No.: 1000003664
Original Date: 12.10.2014 Expiration Date: 6.30.2024
The following are the names, titles, addresses, and phone numbers of all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest in this proposal:

Please see attached Certificate of Incumbency and Resolution The dates of any voluntary or involuntary bankruptcy judgments against any principal having an interest in this proposal, or any firm, corporation, partnership or joint venture of which any principal having an interest in this proposal was an owner, corporate officer, partner or joint venture are as follows:

All current and prior DBAs, alias, and/or fictitious business names for any principal having an interest in this proposal are as follows:

IN WITNESS WHEREOF, BIDDER executes and submits this proposal with the names, title, hands, and seals of all aforementioned principals this 9th day ofApril20_04 BIDDER: batters
Jeff Galterio, Assistant Secretary 1 C
Name and Title of Signatory
Sully-Miller Contracting Company
Legal Name of Bidder
135 S. State College Blvd. Suite 400
Brea CA. 92821
Address
714.578.9600 33-0787630
Telephone Number Federal Tax I.D. No.

SULLY-MILLER CONTRACTING CO.

Ligense 7476l2A
135 S. State College Blvd., STE. 400 • Brea, CA 92821 • PHONE 714-578-9600 License Certificate
I certify under penalty of perjury under the laws of the State of California that the following is true and correct:

CSLB: USattere
747612-A Jeff Galterio, Assistant Secretary
E GONTRASTOANS Consumers Licensees Applicants Or

STATE LICENSE BOARD
SULLY. MILLER CONTRACTING COMPANY
135 SOUTH STATE COLLEGE BLVD
SUITE 400
BREA, CA 92821
Business Phone Number:(714) 578-9600
Entity Corporation
Issue Date 03/30/1998
Expire Date 03/31/2026
License Status
This license is current and active.

All information below should be reviewed.

Classifications

A - GENERAL ENGINEERING

CERTIFICATE OF INCUMBENCY AND RESOLUTION
I, Anthony L. Martino, II, do hereby certify that I am the Secretary of Sully-Miller Contracting Company, a Delaware corporation, and that as such I have access to and custody of the corporate records and minute books of said corporation.

And I do hereby further certify that the following persons are duly elected officers of said corporation.

TITLE NAME
Chairman Of The Board Marcus Leavitt
President William Joseph Thomas Boyd
Vice President, CFO, Treasurer Jae Won
and Assistant Secretary
Vice President and Assistant Secretary Scott Bottomley
Secretary Anthony L. Martino, II
Assistant Secretary Jeff Galterio
Assistant Secretary Mark Pachura
I further certify that the following is a true and correct copy of a resolution duly adopted by the Board of Directors of said Company at a meeting held on December 14, 2023, and that this resolution has not been in any way rescinded, annulled, or revoked but the same is still in full force and effect:

BID TENDERS: GENERAL
RESOLVED, that any officer of the Corporation be and they hereby are authorized in the name and on behalf of the Corporation, under its corporate seal or otherwise (i) to prepare proposals and bids for the supplying of construction materials and the performance by itself or in joint venture, of work of whatsoever nature in connection with the construction or paving of highways, roads and airports and in connection with earthworks and civil engineering projects of all kinds, together with all work incidental thereto, (ii) to execute and submit any and all such proposals and bids to any governmental authority, instrumentality, or agency of the United States, its several states, territories and possessions, including without limitation, any municipality or other political or corporate subdivision thereof, and to any corporation, partnership, sole proprietorship, or other business entity, (iii) in connection with any such submission, to deliver bid deposits or bonds as may be required and (iv) to execute and deliver definitive agreements binding the Corporation to perform work in accordance with any proposals and bids authorized hereby.

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal this 8th day of April 2024.

By: _
(SEAL) Martino.

Secretary
Sully-Miller Contracting Company
135 S. State College Blvd., Ste. 400
Brea, CA 92821
HIR • State of California
Department of
EST. 1927 Industrial Relations
Contractor Information
Legal Entity Name

SULLY-MILLER CONTRACTING COMPANY
Legal Entity Type
Corporation
Status
Active
Registration Number
1000003664
Registration effective date
7/1/2022
Registration expiration date
6/30/2024
Mailing Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Physical Address
135 S STATE COLLEGE BLVD, SUITE #400
BREA, CA 92821
Email Address
[email protected]
Trade Name/DBA
License Number (s)
CSLB -747612

BIDDER'S QUESTIONNAIRE
Bid #CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California

1. Submitted by: Sully-Miller Contracting Company 714.578.9600 Telephone:

Principal Office Address: 135. S State College Blvd. Suite 400. Brea CA 92821

2. Type of Firm:
• C Corporation
• S Corporation
0 Individual/Sole Proprietor or Single -Member LLC
Partnership
Limited Liability Company "C" C-Corp
Limited Liability Company "S" S-Corp
Limited Liability Company "P" Partnership
Other
3a. If a corporation, answer these questions:

Date of Incorporation: 6. 16. 1997 State of Incorporation: Delaware President's Name: William J.T. Boyd
Vice-President's Name: See attached Certificate of Incumbency and Resolution Secretary or Clerk's Name:

Treasurer's Name:
3b. If a partnership, answer these questions:

Date of organization: State Organized in:

Name of all partners holding more than a 10% interest: _ Designate which are General or Managing Partners.

CERTIFICATE OF INCUMBENCY AND RESOLUTION
I, Anthony L. Martino, II, do hereby certify that I am the Secretary of Sully-Miller Contracting Company, a Delaware corporation, and that as such I have access to and custody of the corporate records and minute books of said corporation.

And I do hereby further certify that the following persons are duly elected officers of said corporation.

TITLE NAME
Chairman Of The Board Marcus Leavitt
President William Joseph Thomas Boyd
Vice President, CFO, Treasurer Jae Won
and Assistant Secretary
Vice President and Assistant Secretary Scott Bottomley
Secretary Anthony L. Martino, II
Assistant Secretary Jeff Galterio
Assistant Secretary Mark Pachura
I further certify that the following is a true and correct copy of a resolution duly adopted by the Board of Directors of said Company at a meeting held on December 14, 2023, and that this resolution has not been in any way rescinded, annulled, or revoked but the same is still in full force and effect:

BID TENDERS: GENERAL
RESOLVED, that any officer of the Corporation be and they hereby are authorized in the name and on behalf of the Corporation, under its corporate seal or otherwise (i) to prepare proposals and bids for the supplying of construction materials and the performance by itself or in joint venture, of work of whatsoever nature in connection with the construction or paving of highways, roads and airports and in connection with earthworks and civil engineering projects of all kinds, together with all work incidental thereto, (ii) to execute and submit any and all such proposals and bids to any governmental authority, instrumentality, or agency of the United States, its several states, territories and possessions, including without limitation, any municipality or other political or corporate subdivision thereof, and to any corporation, partnership, sole proprietorship, or other business entity, (iii) in connection with any such submission, to deliver bid deposits or bonds as may be required and (iv) to execute and deliver definitive agreements binding the Corporation to perform work in accordance with any proposals and bids authorized hereby.

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal this 8th day of April 2024.

By:
(SEAL) Martino.

Secretary
Sully-Miller Contracting Company
135 S. State College Blvd., Ste. 400
Brea, CA 92821
BIDDER'S QUESTIONNAIRE (cont'd)
Bid #CIP-23-24-MO1530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California

4. Name of person holding CONTRACTOR's license: William J.T. Boyd License number: 74761.2 Class: A __Expiration Date: 3.31.26 D.I.R. Registration # 1000003664

5. CONTRACTOR's Representative: Jeff Galterio
Title: Assistant Secretary
Alternate: Anthony Lino
Title: Pre-Construction Manager

6. List the major construction projects your organization has in progress as of this date:

A.

Owner: _ Please see attached List of Active Projects
Project Location:

Type of Project:

B.

Owner: _
Project Location:

Type of Project:

Owner:

Project Location:

Type of Project: _
SULLY-MILLER CONTRACTING PI = PATTI IBARRA
3/8/2024 PROJECT LIST - ACTIVE JOBS MK = MAVIS KNOX
CONTRACT 5 AB-219 Concrete * GIGM 103011207
I DIR NO. JDE JOB AGENCY JOB NAME / LOCATION EST. PM SUPT. P.E. FOREMAN AMOUNT FINISH Federal Funds 8450 COMMENTS START
No. of Subs
TED 10225892 Santa Monica Annual Contract Pessa Conover Snidecor 5,000,000 2/10/20| 2/28/25 3,000,000 zz
10226838 Long Beach Annual Local Streets Pessa Roehi Oison Stewart 3/2/20 12/31/24 08-0K1224 Rie. Oak Hill in Victorville in San
391861 02575A0 Caltrans Bernardino County Bahramzi Valenzuela gutierez 121,672,000 11/8/21 12/31/24 A 391051 10259382 Hesperia Ranchero Road Corridor Widening Project Sanchez Royster Williamson Mauldin 37,492,000 1/3/22 6/30/23 z 07-326804 Rie. 210 ADA Curb Ramp Upgrade
NA 10261756 Caltrans Prolect Kirk Conover Love Machado 23,680,000 1/3/22 12/31/25 Avenue R Complete Streets and Safe Routes
A 412775 10272297 Palmdale Prolact Hemandez Garcia 1 10,690,000 7/1/22 9/1/24 4 P-224 Causeway, Boat Channel & Turning Basin
Manson/ Connolly & P-226 Ammunition Pier, NAWPNSTA, Seal 10272672 Seal Beach, JV Beach Quintal Acosta Oison Stewart 3,175,400 6/1/23 4/30/244 Los Angeles
440837 10286538 World Airports Taxiway D Extension (Child Job) Flores Romero Gomez Lecierca 84,560,000 2/23/23 1/11/26 12-OM82U4 Orange County in Laguna Beach
From Ledrolt St to Ruby Si District 12, Route 1. 12-
10288378 Caltrans Ora-1-7.9/10.5 Sanchez quintar Dodge 13,288,975 1/9/23 6/30/24 4 MK A 12518 10288598 Cara Linda Bastanchury Road Improvements Cisneros Jones Clayton Camarilio 5.888,467 1/3/23 12/1/23 El Segundo Bivd Improvement Project No. PW 23-
458807 10290474 El Segundo Almanza Acosta Valenzuela Argueta 6.586,035 5/1/23 9/1/23 Westfield West field improvements, 6351 Owensmouth Ave, N/A 10290595 Development, Inc. Woodland Hills Conover Graham Abcarian 9,151,339 1/23/23 3/15/24 Pavement Preservation (Resurfacing) North Los
Angeles County Project ID No. RMDJOC6742
448872 10292644 LACDPW (Parent Job) Espinoza Conover Coburn 5,250,000 2/1/23 2/1/24 4 N Y Various Residential Streets Reconstruction-2023-
REBID, City Project No. CP1259000, Drawing No.

A 46228610293886 Garden Grove, A-1925 Cisneros Jones Clayton Camarillo 6.988,665 S/15/23 12/15/234 IN N Yi JOC Terminal Apron Concrete Repairs FY 23-24
at John Wayne Airport - MA-080-23010700 - IFB-
TaD 10295103 County of Orange 080-2353102 (Parent Job) Quintal Conover n/a Abcarian 5,000,000 11/25/24 8/2524 1 z> 10289428 Skanska Essex FD&L Sanchez Garcia n/a 4.623,960 7/20/231 Ted Fenimore Ave & Calvados Ave Street & Water
A 472039 10300523 Covina Rehabilitation Project Flores Jones Clayton 1,315,000 9/11/23 9/5/24 z N Y JOC Airfield Pament Repairs at John Wayne
Alrport, Task Order No. 0579-2 (Child Job to
42452310300670 County of Orange 10270913) Quintal Conover Love Lara 1,558,147 7/10/23 zz A 473372 10300938 LACON Halvee Road Cruz n/a Roper 898,000 7/10/23 7/10/24 Pavement Preservation (Resurfacing) North Los
Angeles County, Project ID No. RMDJOC6743
A TBD | 10304995 LACDPW Darent Jobl Quintal Coburn V. Valenzuel: Tuie 5,250,000 9/1/23 9/1/24 Castaic - Halsey Hills South, Project ID No.
• 20700R 10208480 1 ACOPW ›nc001{A7ą Graham N/A Love Jackson 8,172,645 4/15/24 9/27/24 4 NININ A 493829 10306682 Santa Monica FY 23-24 Annual Paving Project Graham NA Love 2.593,951 1/20/24 10/15/244 N TBDI 08-1P700, Rie. 127 Repair Roadways Damages,
A 497372 10309065 Caltrans Emergency Contract - San Bernardino Uddin Bahramzi Thorpe Patel 9,000,000 9/11/23 9/27/244 N N N Y Baker, CA 08-1G6404 Rte. 15/395 Separation in San
A TBO 10309927 Caltrans Bernardino Sanchez Garcia TBD Cardenas 35,935,000 5/6/24 12/31244 N N rep Costco 0428, 2207 W. Commonwealth Ave,
A TBO 10313022 Rose Paving, LLC Alhambra Quintal Coburn NIA Love Tule 1,460.464 1/15/24 3/31/24 4 N N N Altadena Dr & Washington Bivd Roadway
A T8O 10314596 LACDPW Improvements, Project ID No. RMD2504001 Almanza Acosta NA TED Argueta. 5,543,839 3/11/24 12/31/244 N Y TOD Anaheim Real
Estate Partners OC Vibe Public Infrastructure Improvements Re- A 505513 10314672 LLC Almanza Collette NA TED Patel, A 29,965,000 3/31/25 4 IN NNY TAD A 506073 10315281 LACDPW Parent Job) Quintal Coburn NA Tule 5,250,000 4 N N N Y TBO Pavement Reconstruction (Sustainable) North Los
A 508380 10315393 LACDPW Angeles County RMDJOC6773 (Parent Job) Quintal TBD N/A 5,250,000 N NN Y Avenue P - 1674' E/O 25TH St East to 30TH St
East, Palmdale Area, JOC 6770-500.00 (Child Job
A 50507310315398 LACOPW to 10315281) Conover Coburn NA Perez Tule 638,139 3/18/24 3/29/24 4 N Y TOO 10th Street, Et Al JOC6770.501.00 Child Job to
A 506071039LACOP 102152811 Conover Coburn NA Tule 1,105,189 3/18/24 429R4 1 z TBO Admin Expenses to 10315281 Conover NA Perez Tule z z TBD Too (ac) Commercial Terminal Apron Concrete Repairs.

Task Order No. 0700-2, Fund/Job Code 280-280-
280-0320-1400-JX3PW603 (Child Job No.

A 509312 10318823 County of Orange 10295103) Conover Quintal Love Abcarian 1,749,333 2/8/24 11/25/24 4 N N NY Y TBO TBO 190 1801 ° c ACTIVE JOBS - TOTAL 461.751,547
Source: 2-Anaheim
ACTIVE JOBS - PAGE 1 OF 2
SULLY-MILLER CONTRACTING PI = PATTI IBARRA
3/8/2024 PROJECT LIST - ACTIVE JOBS MK = MAVIS KNOX
I OUR NO. JOE JOB AGENCY JOB NAME / LOCATION PM P.E. FOREMAN CONTRACT Source Subsistence WDID # PLA AMOUNT START FINISH Federal Funds AB-219 Concrete SWPPP PLAN Public Works Submit CPR to SM LCP Tracker OCPS Others Program Assigned to COMMENTS |No. of Subs
ACTIVE JOBS - PAGE 2 OF 2

CERTIFICATION OF NON-SEGREGATED FACILITIES
Bid #CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
The BIDDER certifies that it does not maintain or provide for its employees any segregated facilities at any of its establishments, and that it does not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The BIDDER certifies further that it will not maintain or provide for its employees any segregated facilities at any of its establishments, and that it will not permit its employees to perform their services at any location, under its control, where segregated facilities are maintained. The BIDDER agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, rest rooms, and wash rooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. The BIDDER agrees that (except where it has obtained identical certifications from proposed subcontractors for specific time periods) it will obtain identical certifications from proposed subcontractors prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that it will retain such certifications in its files.

Sully-Miller Contracting Co.

BIDDER
Required by the May 19, 1967 order on Elimination of Segregated Facilities, by the Secretary of Labor - 32 F.R. 7439, May 19, 1967 (F.R. Vol. 33, No. 33 - Friday, February 16, 1968 - p. 3065).

DESIGNATION OF SUBCONTRACTORS
Bid # CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. MO153
City of Santa Clarita, California
with NA. Add addt, sheets if needed.

Subcontractor DiR Registration No.* Dollar Value of Work CatTrackling Inc. 100011750 $ 74, 157.80
Location and Place Of Business
Riverside, CA
Bid Schedule Item No's T Description of Work
13,23-34, Alt 15-30
Striping + Markennet 1
License No. Exp. Date:
99U122 03-31-24 951-482-1494
Subcontractor DIR Registration No.* Dollar Value of Work Pavement Recuelena 1000003363 $1,190,801.01
Location and Place of Business sestines Inc
Jurupa Valley, CA
Bid Schedule Item No's: Description of Work
7-9- Alt 6+8 Cold Plane
License No. Exp. Date: Phone | |
569352 05-31-25 951-682-1091
Subcontractor DIR Registration No.* Dollar Value of Work EBS Utilities Adiushug c 1000004286 $85,220.00
Location and Place of Business
Corona, CA
Bid Schedule Item No's: Description of Work
14-19, Alt 9-14 Adjust Utilities
License No. -xp. Date T Phone ( )
932798 05-31-25 951-279-6869
NOTE: A BIDDER or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for pubilc work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this sectlon for an unregistered BIDDER to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the BIDDER is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded. *Pursuant to Division 2, Part 7, Chapter 1 (commencing with section 1720) of the California Labor Code.

DESIGNATION OF SUBCONTRACTORS
Bid # CIP-23-24-MO1530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
with NA. Add addt, sheets if needed.

DIR Registration No.* Dollar Value of Work
altornia Professiona
1000 377409 $130,096.00
ocation and Place of Busines
La Puente, CA
Bid Schedule Item No's: Description of Work
20-22, ALt 31-32 Electriek/ Work
License No. Exp. Date: Phone ( ]
793907 04-30-25 424-810-1358
Jocontracto DIR Registration No.* Dollar Value of Work
tresecan, carr.
constructors 1000035713 $890,550.00
Location and Place of Business
Benicia, CA
Bid Schedule Item No's: Description of Work
10 place Polyester Concrete Overlay 3/4.

License No.
101/546 03-31-26 707-746-8028
Subcontractor DIR Registration No.* Dollar Value of Work Location and Place of Business
Bid Schedule Item No's: Description of Work
License No. Exp. Date: / / Phone (
NOTE: A BIDDER or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage In the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unreglstered BIDDER to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Quarter. Pursant I so 2, Pret paper pubinerch rase to 72010725 cateria labor dot the time the contract 1s

REFERENCES
Bid #CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
The following are the names, addresses, and telephone numbers of three public agencies for which bidder as performed and completed work of a similar scope and size within the past 3 years. If the scope of vork/specifications requests references different than instructions above, the scope of work/specifications shall govern:

1. Please see attached list of references
Name and Address of Owner / Agency
Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed

2. Name and Address of Owner / Agency
Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed
Name and Address of Owner / Agency
Name and Telephone Number of Person Familiar with Project Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from whom bidder intends to procure insurance bonds:_
Please see attached Surety/Insurance Information Sheet
Project
Experience
/m

SULLY - MILLER
CONTRACTING Co.

A COLAS COMPANY
NOVEMBER 19
Sully-Miller Contracting Co.
135 S. State College Blvd., Suite 400
Brea, CA 92821

SULLY- MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
Construction on State Highway Route 15 from Oak
Project Full Name > Route 210 ADA Curb Ramp Upgrade Project Hill Rd. to Bear Valley Rd.

LA County from the Sunland Blvd. crossing
Project Location San Bernardino County CA (Tujunga CA) to Baseline Rd. crossing (Upland CA)
Project Owner CALTRANS CALTRANS
Contact Name John Santos John Santos
Contact Role/
Project Manager Project Manager
Position
Telephone (951) 538 - 5315 (951) 538 - 5315
Email [email protected] [email protected]
Reaching a project boundary length of almost ten This 23-million-dollar project wasn't just a "run of miles, the amount of unique worked that is
required by this project is on an immense scale. the mill" construction project, this project was a The scope of work consists of scheduling; design-build project that required all of the curb ramps on the on/off ramps and frontage roads
mobilization and demobilization; traffic control;
along the 210 freeway to be reconstructed to
temporary barricade and fencing placement;
comply with current ADA standard codes. The
temporary and permanent striping/marking; project limits extended a total of approximately 41 temporary crash cushion installation; landscaping miles that begun 1.4 miles west of the Sunland that included clear and grubbing, roadside Boulevard undercrossing and ended just 0.1 miles Facility Information Project clearing and over two million square feet of east of the Baseline Road undercrossing. The
Description hydroseeding; over 110,000 cubic yards of
projects scope of work consisted of upgrading 264
aggregate base placement; cold milling; HMA ADA curb ramps, installation of accessible application; concrete work which included
pedestrian signal systems, and the installation of
flatwork, gutters, sidewalks;
striping/marking; electrical work that involved pedestrian countdown timers. This project, due to its vast length along the 41 mile stretch of the 210
signal construction, ramp metering construction, freeway, creates unique challenges that are and lighting system installation; as well as a currently being overcome by the Sully-Miller considerable amount of underground work such
team's resilience and desire to challenge the
as pipe culvert construction, pipe and down drain
ordinary.
construction, and pipe liner application.

Start Date November 2021 January 2022
Project Duration
End Date Est. December 2024 Est. January 2024
Cost Contract Amount $ 121,672,000 $ 23,680,000
Sully-Miller Contracting Company | 135S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com ALL

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
9y2y 304942
2020 Pavement Overlay and Resurfacing Spring Valley Lake ADA Ramps and Various Roads Project Full Name >
Program Overlay Project
Project
Location Thousand Oaks, CA Spring Valley Lake, CA
Project Owner City of Thousand Oaks County of San Bernardino Contact Name Michelle McCarty Joseph Schweitzer
Contact Role/
Position Project Manager Supervising Engineer
Telephone (805) 449 - 2477 (909) 387 - 7936
Email [email protected] [email protected] This almost $13 million dollar job was for
Thousand Oaks' annual pavement rehabilitation
program. This project's boundaries covered an The Spring Valley Lake project was a vast-scale extremely large area, just over 63 square miles, project that required the cold milling and re-paving which presented a unique challenge for overall of over 120 separate locations within a 2.25 construction planning. The scope of work for this square mile project boundary. The project's scope project covered a majority of cold milling and hot of work included minor concrete work (such as Facility Information Project
Description mix asphalt and rubberized hot mix asphalt ADA curb ramp, curb and gutter, spandrel, paving, but also included an enormous amount of driveway and retaining curb construction), cold full section removal and replace (almost 142,000 milling (over 2,000,000 square feet worth), square feet), the removal and replacement of over grading, placing asphalt concrete (including 200 curb ramps, over 8,000,000 square feet of asphalt rubberized hot mix), utility adjustment an crack seal application, a large quantity of striping/marking work microsurfacing/slurry seal, utility adjusting,
striping/marking and some.

Start Date May 2020 September 2019
Project Duration
End Date December 2020 April 2020
Cost Contract Amount $ 12,995,708 $ 12,448,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com /m

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANY
Project Full Name > LA County Sheriff's Department Emergency Annual Residential Street Rehabilitation Project Vehicle Operations Center Phase 2A
Project
Location Castaic, CA Compton, CA
Project Owner Los Angeles County Department of Public Works City of Compton Contact Name Victorio Monteil John Strickland
Contact Role/
Position Project Manager Project Manager
Telephone (626) 300 - 3267 (310) 605 - 5505
Email [email protected] [email protected] This project consists of the design and
construction of a Sheriff's Department Emergency
Vehicle Operation Center (EVOC) which will be
used to train Sheriff's personnel on safe operation
of vehicles operated at high speed and on normal
Stretching over seven miles in three separate
city streets. It includes a 5,000 square foot
classroom building with offices, locker rooms, locations, the second phase of Compton's storage, a kitchenette, and restroom facilities, a 44 reconstruction project was completed with a heavy amount of materials and man-power. The scope of
acre high-speed track, with pursuit track area, a work for this job encompassed cold milling and Facility Information Project skid pan for training personnel on how to operate Description vehicles in slippery road conditions and a collision pavement overlay, base application, full depth avoidance track to practice avoiding other vehicle reconstruction, concrete construction (curb and or objects in emergency situations. There is also gutter, sidewalks, driveways, cross gutters, alley intersections, and curb ramps), pavement
a training vehicle parking lot, as well as a separate striping/marking, utility adjusting and traffic loop employee and class attendee parking lot. The
itemized scope of work includes the design and installation. construction of grading, base and asphalt
concrete construction, civil construction work,
structural work, electrical, underground fire/water
system construction, demolition and landscaping.

Start Date March 2020 October 2021
Project Duration
End Date February 2022 Est. July 2022
Cost Contract Amount $ 10,790,000 $ 6,465,000
Sully-Miller Contracting Company | 135S State College Boulevard, Suite 400 | Brea, CA92821 | 714.578.9600 | [email protected] | sully-miller.com LLL

SULLY -MILLER
CONTRACTING Co.

Project Experience
Project Full Name > 2020 Spring Pavement Management Program 2018-19 Overlay Project A Project Location Lancaster, CA Santa Clarita, CA
Project Owner City of Lancaster City of Santa Clarita
Contact Name Vickie Zhao Julia Regan
Contact Role/
Position Assistant Engineer Project Manager
Telephone (661) 945 - 6869 (661) 255 - 4301
Email [email protected] [email protected] Totaling to a distance of over four miles, this
oroiect not onlv included the rehabilitation of
almost a one-mile portion of two-lane arterials, but
With a proposal plan of a base bid and seven
also encompassed the reconstruction of over three
miles of 10th Street West in Lancaster CA, which is alternates, the shear breadth of the Santa Clarita annual overlay project had its initial challenging
one of Lancaster's largest arterial roadways.

Sitting at six lanes wide, the reconstruction called elements. Not only did the scope of work include Facility Information Project general key-cut grinding, cold planning and overlay Description for a mass amount of hot mix asphalt concrete, over 12,000 tons, and asphalt rubber hot mix of various hot mix asphalts, but there was also a concrete, over 13,000 tons. However, this project significant amount of full depth removal and did not only include the planning and paving of replace, as well as utility adjusting, traffic loop installation, striping/marking and some minor
asphalt, the scope of work also included curb ramp
reconstruction, minor electrical work, slurry seal concrete work. application, aggregate base application, and
signing, striping, and marking.

Start Date September 2020 July 2019
Project Duration
End Date December 2020 December 2019
Cost Contract Amount $ 6,252,000 $4,480,399
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com

SULLY -MILLER
CONTRACTING Co. Project Experience

LACOUSCOMPAN
Pavement Rehabilitation at Various Locations -
Project Full Name > Greenstone Avenue Street Improvements Street, Water, and Sewer Improvements
Project Lynwood, CA
Location Santa Fe Springs, CA
Project Owner City of Lynwood City of Santa Fe Springs
Contact Name Noe Martinez Robert Garcia
Contact Role/ Public Works Assistant
Position Associate Civil Engineer
Telephone (310) 603 - 0220 (562) 868 - 0511
Email [email protected] [email protected] At just over a mile long and exiting in a location
With a job location spanning over five square miles within a heavy industry district in Santa Fe Springs, Greenstone Avenue needed an overhaul to say
in six different unique locations, this project proved
the least. The full scope of work included with this
to have challenging aspects not only from its
location, but also with its broad scope of work. This project was cold milling of asphalt concrete, job included level work such as street resurfacing, applying a new layer of asphalt rubber hot mix Project various types of concrete work, traffic signing and asphalt, application of roller compacted concrete, Description utility adjustment, signing, striping and the striping; as well as underground work at the
various locations, which incorporated sanitary construction of PCC curb and gutters, curb ramps, sewer svstem repairs (with CIPP lining), new driveways, cross gutters and sidewalks. The city of water mainline installation including the service Santa Fe Springs provided an offsite (yet close to and the jobsite) lot that contained a mobile asphalt
laterals, smart metes, fire hydrants
plant to induct and mix the materials needed for
appurtenances.
the roller compacted concrete, which was then
transported to the job site.

Start Date October 2020 June 2019
Project Duration
End Date February 2021 January 2020
Cost Contract Amount $ 3,468,000 $ 3,444,361
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com LIL

SULLY-MILLER
CONTRACTING Co. Project Experience

A COLAS COMPANT
Project Full Name > Prairie Avenue Improvements Sherman Way Streetscape Improvements Project Location Inglewood, CA Reseda, CA
Project Owner City of Inglewood City of Los Angeles
Contact Name Hunter Nguyen Courtney Luc
Contact Role/
Associate Engineer Project Manager
Position
Telephone (310) 412 - 5333 (213) 847 - 2354
Email [email protected] [email protected] Located directly off of Prairie Avenue sits the At just under a mile, this four lane arterial required Forum, an iconic entertainment venue, and the (at more than just a standard grind and overlay. On the time) currently under construction Sofi top of the cold planning, hot mix asphalt Stadium. Both of which bring heavy traffic to this placement, base application and minor concrete two mile stretch of a six lane arterial. The scope of work, this job's scope of work also included, traffic Project work for this improvement project included signal construction/relocation, minor electrical Facility Information
Description surveying, traffic control, over 500,000 square feet work, utility adjustment and a large amount of of cold planning, construction of hot mix asphalt beautification work. The beautification work and asphalt rubber hot mix, placement of base encompassed the construction of tree wells, tree material, almost 1000 cubic yards worth planting, mulch placement, top soil furnishing, concrete improvements, utility adjustment, almost 10,000 square feet of landscaping and the signing, striping, and traffic loop restoration. application of cobblestone.

Start Date February 2020 April 2020
Project Duration
End Date July 2020 May 2021
Cost Contract Amount $ 3,258,000 $ 2,623,000
Sully-Miller Contracting Company | 135 S State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com LLL

SULLY-MILLER
SONTRACTING CO Project Experience

ACCOMPANY

WELCOME

OLD TOWN
BORON
Project Full Name > Pedestrian Path Improvements at Various Locations in Boron and Desert Lake 2021 Arterial Street Overlay Project Boron, CA
Location Palmdale, CA
Project Owner County of Kern City of Palmdale
Contact Name Michelle Burns-Lusich Marc Zuber
Contact Role/ Public Works Project Manager
Position Public Works Manager
Telephone (661) 882 - 8861 (661) 267 - 5300
Email [email protected] [email protected] To preserve the historical significance of the
Twenty Mule Team Road, where a majority of the
work for this project had been done, constructing
and/or reconstructing the pedestrian pathways
and the asphalt of the road itself was completed to be cold planed and repaved, over one million with much care and respect. Adding up to almost
square feet, and required a polymer modified
four miles in distance, the job itself had notable asphalt concrete instead of conventional hot mix Facility Information Project
Description concrete and asphalt quantities for a two-lane asphalt or rubberized hot mix asphalt. This project road, consisting of over 1000 cubic yards of also included surveying, striping, marking, utility Portland cement concrete and over 5000 tons of
asphalt cement. The complete scope of work for work.
this project included constructing Class 1 bike
paths, multi-use paths, sidewalks, curbs, gutters
curb ramps, drive approaches and paving hot mi›
asphalt concrete.

Start Date May 2020 July 2021
Project Duration
End Date November 2020 August 2021
Cost Contract Amount $2,536,331 $ 2,067,000
Sully-Miller Contracting Company | 135 State College Boulevard, Suite 400 | Brea, CA 92821 | 714.578.9600 | [email protected] | sully-miller.com m
SULLY-MILLER CONTRACTING CO.

License 747612A
135 S. State College Blvd., STE. 400| • Brea, CA 92821 • PHONE 714-578-9600 The Following are the names, addresses, and telephone numbers for all brokers and sureties from whom Bidder intends to procure insurance and bonds:

Agent for Surety:

Willis Risk & Insurance Services
2010 Main Street, Suite 1050
Irvine, CA 92614
Phone 949/885-1206
FAX 949/885-1225
Contact: Victoria Campbell
Surety :

Liberty Mutual Insurance Co.
8044 Montgomery Road Suite #137
Cincinnati, OH 45236
Phone 513/984-2222 X 321
FAX 513/984-3165
Contact: Kelley Brown
Surety:

Berkshire Hathaway Specialty Insurance
1314 Douglas Street
Omaha, NE 68102
Phone 770/625-2509
Contact: D.J. Conroy
Insurance:

Liberty Mutual Group
1133 Avenue of America
New York, NY 10036
Phone 800/227-9887 Ext 443
FAX 212/391-1954
Insurance:

Marsh USA
445 South Street Suite 210
Morristown, NJ 07962
Phone 973/401-5151
FAX 973/401-5045
Contact: Anton Schmitt

IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Sections 2200 et seq.)
Bid #CIP-23-24-MO153OD
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
As required by California Public Contract Code section 2204, Proposer certifies that the option checked below relating to Proposer's status in regard to the Iran Contracting Act of 2010 (Public Contract Code sections 2200 et seq.) is true and correct:

Proposer is not:
(i) identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code section 2203; or
(ii) a financial institution that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

Los Angeles County has exempted Proposer from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, Los Angeles County will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to Proposer for the Project is less than $1,000,000.

CERTIFICATION
1, the official named below, CERTIFY UNDER PENALTY OF PERJURY, that I am duly authorized to legally bind the Proposer to the above selected option. This certification is made under the laws of the State of California.

Contractor
Sully-Miller Contracting Company If Salteria
Firm Signed
April 9, 2024 Jeff Galterio, Assistant Secrétary
Date Name/Title
Note: In accordance with Public Contract Code section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on contracts for three years.

END OF DOCUMENT
Not Applicable

BIDDER'S BOND
Bid #CIP-23-24-M0153OD
2023-24 Annual Overlay D Project
City Project No. MO153
City of Santa Clarita, California
Proposals must be accompanied by a proposal guarantee consisting of a certified check, cashier's check or BIDDER's bid bond payable to the CITY or cash deposit in the amount not less than ten (10) percent of the total amount bid. Certified check, cashier's check or Bidder's bid bond must be received at City Hall, 23920 Valencia Blvd., Santa Clarita, CA 91355, Attn: Purchasing, Suite 120, and marked with the words "BID BOND FOR" and the bid #, no later than the bid closing date and time, for the BIDDER to be considered responsive.

NOTE: The following form shall be used in case check accompanies bid.

Accompanying this Proposal is a *certified/cashier's check payable to the order of the City of Santa Clarita for: dollars (S _), this amount being not
less than ten percent (10%) of the total amount of the bid. The proceeds of this check shall become the property of said CITY provided this Proposal shall be accepted by said CITY through action of its legally constituted contracting authorities, and the undersigned shall fail to execute a contract and furnish the required bonds within the stipulated time; otherwise, the check shall be returned to the undersigned.

Project Name: 2023-24 Annual Overlay D Project
Bid No. CIP-23-24-M01530D
Project No. M0153
Bidder's Signature

CONTRACTOR/BIDDER
Address
City, State, Zip Code
* Delete the inapplicable work.

NOTE: If the bidder desires to use a bond instead of a check, the following form shall be executed.

The sum of this bond shall be not less than ten percent (10%) of the total amount of the bid.

PROPOSAL GUARANTEE BID BOND
Bid #CIP-23-24-M01530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
KNOW ALL PERSONS BY THESE PRESENTS that Sully-Miller Contracting Company → as BIDDER, and Liberty Mutual Insurance Company as SURETY, are held and firmly bound unto the City of Santa Clarita, as CITY, in the penal sum of Ten Percent* dollars ($_ _), which is ten percent (10%) of the total amount bid by BIDDER to CITY for the above-stated project, for the phe total am lich sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents.

THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to CITY for the above-stated project, if said bid is rejected, or if said bid is accepted and the contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of CITY.

IN WITNESS WHEREAS, the parties hereto have set their names, titles, hands, and seals, this 4th Day of April _ 2024
WHatters
CONTRACTOR: JEFF GALTERIO ASSISTANT SECRETARY
Name and Title of Signatory
Sully-Miller Contracting Company
Legal Name of Bidder
135 S State College Blvd., Ste 400, Brea, CA 92821
Bidder Address i C:
0,01
714-578-9600 33-0787630
Telephone Number Federal Tax I.D. No.
iberty Mutual Insurance Company
Very Mula ran Call
SURETY*:

Name Victoria M. Campbell, Attorney-in-Fact
714-578-9600 [email protected]
Phone Number and Email
8044 Montgomery Rd., Ste 150E, Cincinnati, OH 45236
Address
*Provide BIDDER and SURETY name, phone number, email, and the name, title, address, and phone number for. authorized representative. IMPORTANT - Surety Companies executing Bonds must appear on the Treasury Department's most current list (Circular 570, as amended) and be authorized to transact business in the State where Surety signatures must be notarized prior to submittal.

CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange
On_ April 09, 2024 before me, _ Monica Baldacci, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph MONICA MARIE BALDACCI B is true and correct.

COMMISSION #2447801 WITNESS my hand and official seal.

Notary Public - California

ORANGE COUNTY
My Commission Expires Mabi
MAY 25, 2027
Signature®
Signature of Notary Public
Monica Baldacci, Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Bid Bond Document Date: April 4, 2024 Number of Pages: _ Signer(s) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:
* Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: Signer Is Representing: _
Sully-Miller Contracting Company
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange
On APR 0 4 2024 before me, _ L. Clark, Notary Public
Date Here Insert Name and Title of the Officer
personally appeared Victoria M. Campbell
Name(s) of Signer(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
+ the state ot Galltornia that the toregoina paraarao
s true and correc
L. CLARK WITNESS my hand and official seal.

Notary Public - California
Los Angeles County
Commission # 2336730 chL
My Comm. Expires Nov 28, 2024 Signature
Signature of Notary Public
Place Notary Seal Above
- OPTIONAL
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an nintended document.

Description of Attached Document
Title or Type of Document: _ Document Date: APR 0 4 2024 Number of Pages: Signer(s) Other Than Named Above: _
Capacity(ies) Claimed by Signer(s)
Signer's Name: Signer's Name:
• Corporate Officer - Title(s): • Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual X Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator ] Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: Signer Is Representing:
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated.

Liberty Liberty Mutual Insurance Company
Mutual. The Ohio Casualty Insurance Company Certificate No: 8205201-971932 West American Insurance Company
SURETY

POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the "Companies"), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Khoi Tran:

Victoria M. Campbell
all of the city of each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons.

IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 5th day of April 2021
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
TUAL CORPORATE CASUALTY I CORPORATE INSURANCE CORPORATE West American Insurance Company 1912 1919 1991
OIHO
100391 SSACHUSE INDIANA ANVAN
THI By:

David M. Carey, Assistant Secretary
State of PENNSYLVANIA
value guarantees. SS
On this Sth before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance letter of credit, Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes ) verification inquiries, therein contained by signing on behalf of the corporations by himself as a duly authorized officer.

N WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written. or residual
Commonwealth of Pennsylvania - Notary Seal
Teresa Pastella, Notary Public Pastella (POA
Montgomery County
My commission expires March 28, 2025 By:

Commission number 1126044 please call 610-832-8240 or email [email protected].

Teresa Pastella, Notary Public
Member, Pennsylvania Association of Notaries
Not valid for mortgage, note, loan, This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance currency rate, interest rate ARTICLE IV - OFFICERS: Section 12. Power of Attorney. For bond and/or Power of Attorney Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attoreys-in-fact, subject to the limitations set forth in their respective powers of attomey, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority.

ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings.

Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary.

Certificate of Designation - The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys-in- fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations.

Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any power of attomey issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed.
1, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has nat been revoked.

IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 4th day of April _ 2024

SAL INSURANCE SUALTY INSURANCE CORPORATE

CORPORATE
1912 1919 1991 Rani tele
BEACHUSE ANTINOR By:

ANYAMOD INDIANA Renee C. Llewellyn, Assistant Secretary THI
LMS-12873 LMIC OCIC WAIC Multi Co 02/21

NON-COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106) Bid #CIP-23-24-MO1530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California
To the CITY OF SANTA CLARITA:

In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106, the Bidder declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the Bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

THE BIDDER'S EXECUTION ON THE SIGNATURE PORTION OF THE "BIDDER'S CERTIFICATION" SHALL

ALSO CONSTITUTE AN ENDORSEMENT AND EXECUTION OF THOSE CERTIFICATIONS WHICH FORM A PART OF THE PROPOSAL. BIDDERS ARE CAUTIONED THAT MAKING A FALSE CERTIFICATION MAY SUBJECT THE CERTIFIER TO CRIMINAL PROSECUTION.

NON-COLLUSION AFFIDAVIT
Bid #CIP-23-24-MO1530D
2023-24 Annual Overlay D Project
City Project No. M0153
City of Santa Clarita, California

TO BE EXECUTED BY EACH BIDDER OF A PRINCIPAL CONTRACT

STATE OF CALIFORNIA

COUNTY OF LOS ANGELES
ORANGE
Jeff Galterio being first duly sworn deposes and says that he/she is the Assistant Secretary (sole owner, a partner, president, etc.) of Sully-Miller Contracting Company the party making the foregoing bid; that such bid is not made in the interest of or behalf of any undisclosed person, partnership, company, association, organization or corporation, that such bid is genuine and not collusive or sham, that said BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, or that anyone shall refrain from bidding, that said BIDDER has not in any manner, directly or indirectly sought by agreements, communication or conference with anyone to fix the bid price of said BIDDER or of any other BIDDER, or to fix the overhead, profit, or cost element of such bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in such bid are true, and further, that said BIDDER has not, directly or indirectly, submitted its bid price, or any breakdown thereof, or the contents thereof, or divulged information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company, association, organization, bid depository, or to any member or CITY thereof, or to any other individual information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company association, organization, bid depository, or to any member or CITY thereof, or to any other individual, except to such person or persons as have a partnership or other financial interest with said BIDDER in his general business.

Bidder: Sulatters
Title Jeff Galterio, Assistant Secretary
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

State of California
County of Orange
On April 09, 2024 before me, _ Monica Baldacci, Notary Public Date Here Insert Name and Title of the Officer
personally appeared Jeff Galterio
Name(s) of Signers)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws
of the State of California that the foregoing paragraph is true and correct.

MONICA MARIE BALDACCI K
COMMISSION #2447801 WITNESS my hand and official seal.

Notary Public - California

ORANGE COUNTY
My Commission Expires
MAY 25, 2027
Signature of Notary Public
Monica Baldacci, Notary Public
Place Notary Seal Above
- OPTIONAL —
Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document.

Description of Attached Document
Title or Type of Document: Non-Collusion Affidavit Document Date: April 9, 2024 Number of Pages: _ 1
Signers) Other Than Named Above:

Capacity(ies) Claimed by Signer(s)
Signer's Name: Jeff Galterio Signer's Name:
* Corporate Officer - Title(s): Assistant Secretary Corporate Officer - Title(s):
• Partner - • Limited • General • Partner - • Limited • General • Individual • Attorney in Fact • Individual • Attorney in Fact • Trustee • Guardian or Conservator • Trustee • Guardian or Conservator • Other: • Other:

Signer Is Representing: Signer Is Representing:

Sully-Miller Contracting Company
©2014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 BALDACCI, Monica (SBREA)
From: [email protected]
Sent: Friday, April 12, 2024 9:56 AM
To: BALDACCI, Monica (SBREA
Subject: FedEx Shipment 775916812990: Your package has been delivered Warning: Message sent from Internet with visible sender address not matching real one [email protected] Do not click on the links or attachments unless you are sure of the sender's address.

Hi. Your package was
delivered Fri, 04/12/2024 at
9:47am.

Delivered to 23920 VALENCIA BLVD 120, Santa Clarita, CA 91355 Received by O.MARCO

OBTAIN PROOF OF DELIVERY
How was your delivery ?
1 TRACKING NUMBER 775916812990
FROM Jessica Daniels
135 S. State College Blvd
Suite 400
Brea, CA, US, 92821
TO City of Santa Clarita
Purchasing
23920 Valencia Blvd.

Ste. 120
Santa Clarita, CA, US, 91355

DEPARTMENT NUMBER ESTIMATING
PURCHASE ORDER NUMBER 100783.72140.80
SHIP DATE Thu 4/11/2024 03:06 PM
DELIVERED TO Receptionist/Front Desk
PACKAGING TYPE FedEx Envelope
ORIGIN Brea, CA, US, 92821
DESTINATION Santa Clarita, CA, US, 91355
SPECIAL HANDLING Deliver Weekday
NUMBER OF PIECES 1
TOTAL SHIPMENT WEIGHT 0.50 LB
SERVICE TYPE FedEx Priority Overnight
2 FedEx Delivery
Manager® puts you
in control
Enroll for free and get more visibility
and control for your deliveries from
start to finish. And if you need to
make a return, our network of
10,000+ locations makes drop off
easy.

ENROLL NOW

FOLLOW FEDEX
• Please do not respond to this message. This email was sent from an unattended mailbox.

This report was generated at approximately 11:55 AM CDT 04/12/2024.

All weights are estimated.

To track the latest status of your shipment, click on the tracking number above.

Standard transit is the date and time the package is scheduled to be delivered by, based on the selected service, destination and ship date. Limitations and exceptions may apply. Please see the FedEx Service Guide for terms and conditions of service, including the FedEx Money-Back Guarantee, or contact your FedEx Customer Support representative. © 2024 Federal Express Corporation. The content of this message is protected by copyright and trademark laws under U.S. and international law. Review our privacy policy. All rights reserved.

Thank you for your business.
3 FedEx Shipment Receipt
Address Information
Ship to: Ship from:

Purchasing Jessica Daniels
City of Santa Clarita
23920 Valencia Blvd. 135 S. State College Blvd
Ste. 120 Suite 400
Santa Clarita, CA Brea, CA
91355 92821
US US
6612554936 7145789600
Shipment Information:

Tracking no.: 775916812990
Ship date: 04/11/2024
Estimated shipping charges: 16.73 USD
Package Information
Pricing option: FedEx Standard Rate
Service type: Priority Overnight
Package type: FedEx Envelope
Number of packages: 1
Total weight: 1 LBS
Declared Value: 0.00 USD
Special Services:

Pickup/Drop-off: Use an already scheduled pickup at my location Billing Information:

Bill transportation to: Shipping Admin-473
Your reference:

P.O. no.: 100783.72140.80
Invoice no.:

Department no.: ESTIMATING
Thank you for shipping online with FedEx ShipManager at fedex.com.

Please Note
The estimated shipping charge may be different than the actual charges for your shipment. Differences may occur based on actual weight, dimensions, and other factors. Consult the applicable FedEx Service Guide or the FedEx Rate Sheets for details on how shipping charges are calculated.

← All documents from this meeting