Cities Index.
Initial Study/Mitigated Negative Declaration (available in the City Clerk's Reading File)

Santa Clarita City Council
June 25, 2024

Document
Initial Study/Mitigated Negative Declaration (available in the City Clerk's Reading File)
Meeting
June 25, 2024
Body
Santa Clarita City Council
Pages
6
Original file
11.5 MB
Text extracted from the city's file for reading and search. Open the original on santaclaritacityca.iqm2.com. That file is the official record.

il
il
'I
'I
I
I
II
! I
,I
II
II
!II
I I,
il
il
I I
II
I
il
January 2002

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

PLUMCANYON COUNTY PARK
Final
Initial Study/Mitigated Negative Declaration
Prepared For:

LosAngeles County Department of Parks and Recreation
433 South Vermont Avenue, 4thFloor
LosAngeles, California 90020
Prepared By:

EDAW,Inc.
3780 Wilshire Boulevard, Suite 250
LosAngeles, California 90010 "
January 2002

I
I
I
I
I
I
I
I
Table of Contents

PLUM CANYON COUNTY PARK PROJECT

FINAL INITIAL STUDYIMITIGATED NEGATIVE DECLARATION

TABLE OFCONTENTS
Section
CLARIFICATIONSANDREVISIONS iii

1.0 PROJECTDESCRIPTION 1-1
Introduction 1-1
ProjectObjectives 1-1
P · L' .reject ocation 1-1
Background 1-1
DescriptionoftheProject 1-1
Schedule 1-7

2.0 INITIALSTUDYCHECKLIST 2-1
I
I
I
I
CEQAEnvironmentalChecklistFormandInitialStudy 2-1
EnvironmentalFactorsPotentiallyAffected 2-7
Determination 2-7
EvaluationofEnvironmentalImpacts 2-8

3.0 DISCUSSIONOFENVIRONMENTALIMPACTSAND
MITIGATIONMEASURES 3-1
I
I
I
I
I
I
I
Aesthetics 3-1
AgriculturalResources................................................................................•....................3-2 AirQuality 3-2
BiologicalResources 3-5
CulturalResources 3-9
GeologyandSoils 3-10
Hazards : 3-11
HydrologyandWaterQuality 3-13
LandUseandPlanning 3-14
MineralResources : 3-15
Noise 3-15
PopulationandHousing 3-18
PublicServices 3-18
Recreation 3-20
Transportation/Circulation : 3-21
UtilitiesandServiceSystems 3-23
MandatoryFindingsofSignificance 3-24

4.0 LISTOFPREPARERS 4-1

5.0 PERSONS/AGENCIESCONTACTEDANDREFERENCES S-l
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/(}(l. 1", ... r."'''~N<$<l«'(fi.''I!''<'<'(//':.1'0: l()::$"l.Il Page i

I fable ofContents
I
I
I
I 6.0
I 7.0
I
I
I
APPENDL,{A

APPENDIXB
I Figure1
Figure2
Figure3
Figure4
Figure5
Figure6
Figure7
I
I
I Table1
Table2 ,
Table3
Table4
Table5
Table6
I
I
I
I
I
~

PLUM CANYON COUNTY PARK PROJECT

FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
TABLE OF CONTENTS-(Continued)
Co,MMENTSRECEIVEDONTHEDRAFTINITIALSTUDYIMITIGATED
NEGATIVEDECLARATIONANDRESPONSES 6-1
MITIGATIONMONITORINGANDREPORTINGPROGRAM 7-1
VISTAInformationSolutions,SiteAssessmentPlusReport(Hazardous MaterialslWasteSites
FocusedCoastalCaliforniaGnatcatcherSurveyResults

LIST OF FIGURES
RegionalLocationMap 1-2
SitePlan 1-4
ViewsoftheProjectSite · 2-3
ExistingOn-SiteFeatures 2-4
ExistingSingle-FamilyResidencesWestoftheProjectSite 2-5 Single-FamilyResidencesNorthandSouthoftheProjectSite 2-6 PlumCanyonCountyParkBiologicalResources : 3-7

LIST OF TABLES
FederalandStateAmbientAirQualityStandards 3-3
SCAQMDAirQualityImpactSignificanceThresholds 3-3
Project-RelatedConstructionEmissions 3-4
TypicalConstructionNoiseLevels 3-16
PlumCanyonCountyPark- TripGenerationEstimates 3-21
MitigationMonitoringandReportingProgram 7-2
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/OOJPI.", ("..~"''' \, ,f.,(,I(i~,,/) JtX'Q/ :)'0: /o':s,4.11 Page ll

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
J
1 ClarIficatIonsandRevIsIons

CLARIFICATIONS AND REVISIONS
Minor revisions have been made to the Plum Canyon County Park Project Draft Initial StudylMitigated Negative Declaration (ISIMND). These revisions have not resulted in a change in analysis and/or conclusions of the Final ISIMND. This section identifies the changes to the document that resulted from public comments on the Draft ISIMND. Deleted text is shown with an overstrike, and new text is bold, as presented below. The Final ISIMND reflects these revisions and text changes and is shown without the redlined text.

Since the circulation of the Draft ISIMND, KEA Environmental, Inc. has merged with EDAW, Inc. All references toKEA Environmental in the document have been changed toEDAW.

The following is added at the end of the first paragraph onpage 1-1of the Draft IS/MND:

This Final IS/MND also presents revisions t~ Section 3.IV., Biological Resources, and Section 3.XIII., Public Services(Fire Protection), in response to someofthe written comments (seeSection6.0)receivedon ' the Draft ISIMND,which was circulated for public and governmental agency review from February 13, ,.2001through March 14,2001, and the Mitigation Monitoring and Reporting Program (seeSection7.0).

Mr. Larry Hensley's telephone number listed under "3. Contact Person and Phone Number:" on page 2-1 of theDraft ISIMNDischanged as follows:
(213)738~2965
The first paragraph under "10. Other agencies whose approval is required:" on page 2-2 of the Draft ISIMND isrevised as follows:

Prior to project construction,permits from may need to be obtained from the two state regulatory agencies identifiedbelow. Therequiredpermitsare for theproposedconstructionin an areaidentifiedas~aters of the YnitedStates""CDFG-jurisdictional drainages" (seeSection3.IV,BiologicalResources,for discussion)and forsurfacewaters(seeSection3.vm,HydrologyandWaterQuality).

Section 3.IV., Biological Resources (a-c) onpages 3-6to 3-8 of the Draft ISIMND, is revised as follows:

Less Than Significant Impact. -A-g~neraI-T\Vobiologicalreconnaissancesurveyswas-wereconductedby an ~EDA W, inc. (K:BAEDAW) biologistforthe Plum CanyonCountyParksite on November 15,2000,andApnl 4. 200I; the latter was conducted to prepare response to comments. Thereconnaissance survevsfocusedon determiningthe presence or potentialfor significantbiologicalresourceson or adjacentto thesite. VegetationcommunitiesandbiologicalresourcesaredocumentedinFigure7.

Vegetationonsiteconsistsprimaffiy-ofdisturbedcoastalsagescrubdominatedbydeerweed(Lotusscoparius), withscatteredindividualsofCalifomiasagebrush(Artemisiacalifomicai, buckwheat(Eriogonumfasciculatum), and blacksage (Salvia melliferat. NativeundN!!.onnativeplant species interspersedbetweenthe nativeshrub speciesinthishabitatincludehorehound(Marrubium vulgare),pineappleweed(Chamomilla suaveolens),black mustard(Brassica nigra), red-stemliIarec(Em(/iIl1ll ciclifarilllll), Shepherd's purse «('(l[)sel/ahll1:m-pastori,\'). clover (Tri&lilllll sp.), Russian thistle (S(/I.mia iberica), goldfields (Laslhellia sp,), popcom flower (Pillgiobotilrvs sp.), ga/:lllia(O(/II::i" sp.), pectocarva(Pectocmy" sp.), cudweed (Gnaphalilllll sp.), and tree tobacco (Nicotiana glallca). A narrow'band of unvegetated land occurs along the western and southern boundariesoftheprojectsite,asmappedinFigure7.

Withinthedisturbedcoastalsagescrubhabitat,therearetwonarrow(en~te-tt\ree feetwide)drainagesthathave been mappedas "waw~~I:'lh\.'-I:;nitl'tI-Sllttt'5CDFG-jurisdictionalareas" due to the presenceof a well-defined bed andbankassociatedwiththe drainages(i.e.,a distinctlyincisedchannel)and the presenceof an "ordinary PlumCanyonCountyPark ProjectFin:11InitialStudy/MitigatedNegativeDeclarationOIOOJP/"m('.,.,,,. ,V('g.t1X'Iji.,,/) doc OII:J'O:lO.'f III Pageill

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Clariflcations and Revisions
high water mark," which d~rtl5-deAnesis defined, in part, as a "destruction of terrestrial vegetation" (e.g., the lack of vegetation within portions of the drainage that was observed during site reconnaissance). Analvsis of these drainages bv the U.S. "mw Coros of Engineers (Corps) determined that they did not f.'lllwithin the Corps' regulatorv jurisdiction; therefore. no federallv protected wetlands would be affected bv the proposed project.

Howcver, the Califomia Department of Fish and Game (CDFO) conducted a separate field analvsis and detcmlined that it would take regulatory jurisdiction over the channels. These drainages were typically bare; some areas at the bottom of the channel support non-native grasses. These two drainages merge to form a wider and more deeply cut "waters of th~ntled-SttttesCDFG-jurisdictional" area (three to Ave teet wide). These drainages begin in the vicinity of the proposed tot lot and group pienic areas; and extend to the south. +I!e-Y:& AAllYCorpsof F.ngineers (Cofl~ntaeted-regardtng the proposed projeet and the idell~rainages; the GOFpS-has-<letennined-that-tlle-pmposed-pffijeet-wouk!-notdischalb~re4ged-or-A"-materials-int~teF-ef4he -lJffi1e4-States" or lllHtdjacem-wetland.--Additi&na~e drainages on site are considered "isolated waters" (deAned-b;:-the-GortlS-as...:':nollllawi,'tlble,isolated, [and] intrMtate"). A recent U.S. Supreme-Gourt-Rlling-found lhaHhe-Gorps-dees-not-have-juFisdietien of "isolated waters" under Section 404 of the-Glclm-Watcf-t\et.:
+herofore.-the-proj)OSe(I-projeet-is-not-subject-to-Gorps-juRsdietion-ulldcr Section-40+-0f.the-Gtenn-Water-A¬ l; and (I SectiOll...4(}4-pCfmil-WOuld-not--OO-reqtli~ tv~ Ilo'Ne'ler.impacts to Iheso-drainages maY,Althoughthe Corps has not takcn regulatorv jurisdietion on the proposed project, impacts to these drainages would require permits from Ihe-Qllifomi~rtmcnt ef fish and Game fCDFG) and the California Regional Water Quality Control Board (RWQCB) (a 1601Streambed Alteration Agreement and a 401 permit, respectively;-eepending-on-whetheF-Or-net GDfG or RWQGB would tal(e jurisdiction over irn~o-these drainages). Since these drainages total less than one fourth-tenth of an acre, impacts arc anticipated to be less than significant but would require mitigation at a 1.5to I ratio (1.5acres of mitigation for each acre of impact) in order to complv with the "no net loss" policv of CDFG. The total area of impact associated with the CDFG­ jurlsdlctlonal drainages on site is 0.046 acre; therefore, based on the 1.5:1 mitigation r:Jtio, 0.069 acre of mitigation would be required.

The disturbed coastal sage scrub habitat continues off-site along the relatively flat topography to the cast. Within this adjacent off-site area is a sandy wash, which would qualify as another ""taters of the United-States;!:CDFG­ jurisdictional drainage, as shown in Figure 7. This wash is also associated with small patches of riparian vegetation in the form of mule fat scrub (Bacclzarissalicifolia). Sandy wash habitat within the region is suitable for the federal and state-listed endangered slender-homed spineflower (Dodecahemaleptocerast. As currently designed, the proposed project would not impact the wash, and, therefore, no impacts would oceur to any population of slender-homed spineflower, or the riparian habitat within the drainage, One salt cedar (Tamarixsp.) occurs off-site from the southeast end of the project area (Figure 7). Intact coastal sage scrub occurs on the slopes to the east of the project site. California sagebrush is the dominant species in this area, with smaller pockets of white sage (Salvia apiana), scrub oak (Quercus berberidifolia), and buckwheat. The Califomia gnatcatchcr (Po/ioQ1ilacaliwrllica caliwmica), a federally listed threatened species. was not observed during either site reconnaissance visit. However, based on input bv the U.S. Fish and Wildlife Service IUSFWS), focused surveys for the California gnatcateher were recommended for the site and within all suitable vegetation within 300 feet of the proposed development. In response to USFWS recommendations, the County conducted focused surveys for the California gnatcatcher, No coastal California gnatcatchers were observed or detected during any of the focused surveys. The absence of the gnatcatcher may be attributed to the isolated nature of the project site and the high level of urban development in the area.

The disturbed nature or the project site suggests that migratorY bird species would not likely nest within the disturhed coastal sage scruh hahitat on site. However. due to the low potential for bird species covel'ed under the MigratOl'v Bird Treaty Act to nest on site, the Los Angeles County Department of Park and Recreation would "estl'ict all vegetatilm removal of suitable nesting habitat to the non-breeding season {generally September 1through February 281, Nesting habitat for the majority of migratory bird species typically consists of native scrub species within the vicinity of the project site, such as California sagebrush, buckwheat, and white sage. Vegetation of at least one meter in height offers the optimal 1--Mr.-f)tt,,",,~SlatlUt~jo!lri:tlt·tM:;lG!'t ..St!\!IIt"h..Regulot~rQn.*~!~AI tlfllltl.\RllY. UlS AAgl'l~lOisl~~f.&l!!illffi':;; k!~~frrU~~ItIIII~~'II~)Ilf!lllo!f~fks 1I11t!Rt'I!rt'lltioo...Jalltla~ ~~~\IM~IItl-t».+It~y-tMtk~~l;-un(hll!~lltltIHltHtl~~~~I~~n~Pft'fltoH;tlUt'H~l!gttftlitlg-its jm·l!,tlf~li;"h\"~~.llI!tldoWilltlr,;.(IRI~~lllttlO!f-d~1I l,I/uttlF_\otr-=R~n~~~ ...Jallllllt~}4-r.Htlte:HIIaHIIo! (:;ltl~I;>tl'rI"lt·hu"""jllrbdl.:!il ..t-(lTo!t'.i~)lal~I-\~II'tlr""\~llto!-\hl).

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 'Ol()()JPlUM(''''"on V<g</IX'(fi~"') c/q(''0/1:),0:/0.":.<,1.11 Pageiv

ClarificatIons and RevIsIons
'I
nesting habitat for most bird species. However, there arc some ground-nesting species that can usc shorter vegetation, such as small shrubs or tall grasses, as protective cover for their nests. As previously stated, the disturbed coastal sage scrub habitat on site (l.e., sub-meter height) does not provide optimal nesting habitat for migratory bird species, particularly when highly suitable habitat occurs off-site to the east. The presence of this off-siteoptimal nesting habitat would likelyresult in the majority ofthe nesting activity to occur in these off-siteareas rather than within the project site.

I
I
TIleproposedprojectwouldhavea lessthan significantimpactonsensitiveplantandanimalspecieson site;as previouslymentioned,no federallyprotectedwetlandswouldbeaffcetcdbytheproposedproject. However,the following mitigation/avoidancemeasures would minimize impacts to the COFG.jurisdictionaldrainages that wouldbeeliminatedfromtheprojectsite andimpactstopreyiouslyunidentifiedbiologicalresoureesifobserved duringprojectconstruction.

I "
"'litigation :\te:lSIII'cS
I
M-IV.1 The County shall mitigate impacts to 'the CDFG-jurisdictionaldrainages by contributing to a mitigationfund through th~payment of afee. The mitigationfund shall be used to mitigate off­ site at all appropriatepreserve selected by CDFG. Thefee shall be usedtopurchase 0.069acres ofmitigatio,~,attheselectedpreserve.

I 1\1-IV.2_lf disturbance of suitable nesting habitat occurs during the nesting season (February 15 through August 31), a qualified biologistshall conduct a general bird survey witltin a 300-foot buffer from the limits of grading no more titan 15 daysprior to thefirst ground disturbance to determine ifnestlng birdsarepresent. If nestlng birdsarenotfound during the survey on site or withill300feet of the limits ofgrading, constructionactivitiesmayproceed. During construction, similar surveysfor nesting birdsshall be conducted on a weeklybasison site and within a 300- foot bufferfrom the limits of construction. If a nesting bird listedasprotected by the Migratory Bird TreatyAct is observedon site or wlthln 300feet of thegrading limits, all activitywithin 300 feet of the nest shall be halted until it is certainthat theyoung havefledged. This measure will ensurecompliance with'the MigratoryBird TreatyAct.
qSection 3.IV., Biological Resources (d-f) on page 3!Ofthe Draft ISIMND,isrevised as follows: _ I
I
I
I
LessThan Significant Impact. Thesiteisborderedbyresidentialdevelopmenttothenorthandwest;andbya majorroad(PlumCanyonRoad)tothesouth. Thesiteitselfisrelativelydisturbedanddoesnotprovideoptimal habitat for reSIdentor migratoryspeeics in the region. Impactsto migratorybirds would be minimizedbv resu;cting vegetation removal of suitable nesting habitat to the non-breedingseason(generally September I through February 281- The location of the project site adjacent to pre-existing development would not substantiallyinterferewith the movementof aJ:1Ywildlife species throughthe area. Additionally,California's Natural CommunitiesConservationPlan (NCCP) does not currentlyencompassthis portion of Los Angeles County,and the Countyhas not designated any portion of the site as part of a County-designatedSignificant EcologicalArea(SEA). Therefore,the proposed project would not conflictwith any local, regional, or state preservation/conservationguidelines. Nomitigationmeasuresarenecessary. . I~
Section 3.xm. Public Services (a- Fire Protection), on page 3Yof the Draft ISIMND is revised to add the following at the end of the fourth sentence:

I
I
I The implementationof the project would be in accordancewith the latest CountyFireDepartmentcodes and guidelines,including, but not limited to the following:

I • Specific fire and lifesafety requirements for the construction phase shall be addressed at the building fire plan check.
• Every building constructed shall be accessible to Fire Department apparatus by way of access roadways. with an all weather surface of not less than the prescribed width, unobstructed, clear-to- I PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegatIveDeclarationotoosPh~",("'muon,\'rgt/(,(, j'i,flr1,tIC<"01:.f,o:I(J':C 1.\1 Pagev

I
I

1.0 Project Description

1.0 PROJECT DESCRIPTION
I
I

INTRODUCTION
I
The Initial StudylMitigated Negative Declaration (IS/MND) was prepared pursuant to the requirements of Sections 15063, 15070, and 15071 of the California Environmental Quality Act (CEQA) Guidelines.

This document summarizes and addresses the results of the Initial Study prepared to determine if any significant environmental effects would occur from the proposed development of Plum Canyon County Park in the community of Saugus, immediately outside the boundaries of the City of Santa Clarita, as shown in Figure 1. This Final ISIMND also presents revisions to Section 3.N., Biological Resources, and Section 3.XIII., Public Services (Fire Protection), in response to some of the written comments (see Section 6.0) received on the Draft ISIMND, which was circulated for public and governmental agency review from February 13,2001 through March 14, 2001, and the Mitigation Monitoring and Reporting Program (see Section 7.0).

I
I
I
I
I

PROJECT OBJECTNES
The primary objective of the project, as identified by the Los Angeles County Department of Parks and Recreation, is to develop a new park that would provide passive and active year-round recreation opportunities to serve the local residential community. Specifically, the project objective is to provide a local park with a service radius of up to one-half mile.

PROJECT LOCATION
I
I
The project site is located in an unincorporated area of the County of Los Angeles, known as the community of Saugus. The project site, which is approximately 13 acres, is located at 2822 North Via Joyce Drive in a recently developed residential area, immediately east of the City of Santa Clarita boundaries. The project site is bounded by Plum Canyon Road on the south, Via Joyce Drive on the west, residential lots on the northwest, and by a City of Los Angeles Department of Water and Power (LADWP) utility easement on the east.

BACKGROUND
I
I
On November 3, 1992and November 5, 1996,the voters of Los Angeles County approved "Proposition A" assessment measures which provide funding for the Los Angeles County Regional Park and Open Space District to develop and improve facilities to meet the diversified needs of the citizens of Los Angeles Co~nty.

I
I
I
I
~

DESCRIPTION OFTHE PROJECT
The proposed project would result in the conversion of approximately 7 of the 13acres of undeveloped land into apassive and active year-round public park; theremaining six acres would remain undeveloped.

The project site is comprised of two relatively flat pads, one in the northern end and the other in the southern end of theproject site; correspondingly, the proposed project would be divided into twophases.

Funding for Phase II is not available at this time; however, for the purpose of this environmental document, PhaseII isassumed tobe implemented immediately following thedevelopment ofPhase I.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/OOJPI"", c,,,,..,,,\'<"«/«,(/l.,,/},,1« O/.I:J.'Q:/IJ':5 ,11/

Page 1 ends

I
I
I
I ..t,<,',',.
.-:.".-:-l
::~
I <.r'::1.,I
(
I,
I
,
III
II
I
III
III
IIl_
o Figure 1
Regional Map
I
I
I
I
I
I
NoScale
Page2 Plum Canyon County Park
01008PlumC(IIIYOIJIFjgllreslFjgI RegionatMap .11115100

I
I
I

1.0 Project Description
Phase 1Project CompOllellts
I
Phase I involves the development of the northern pad (approximately three acres) and would consist of the following: walkways, utilities, tots play area, site amenities (picnic tables, park benches, bicycle rack, etc.), landscape and irrigation, restrooms/maintenance area, a IS-space parking lot, security lighting, and signage, as shown inFigure 2. More detailed descriptions of these components are presented below.

I
I
I
Walkways and Parking
• Walkways would be provided to the tots play area, restroom building.and from the parking lot to the park.
• Parking lot would be asphalt paved and accommodate 15 vehicles, including handicap spaces. The parking lot would be sloped to prevent water puddles from forming after rains and irrigation.

Security lighting (parking lot lighting) would be provided. .

Utilities
I • Utility infrastructures, including sewer, water, and electricity would beprovided.

Tots Play Area
I
I
• The tots play area would be approximately 3,500 square feet and include playground equipment suitable for tots fouryears oryounger in age and a sand play area. • The prime consideration inthe development of the play area is the safetyand security of the children; designs would comply with American Disability Act's (ADA) Accessibility Guidelines for Play Areas for theYear 2000.
• An ADA access path fromtheparking to the play area would be provided. • Concrete benches would be provided for adults to supervise the children inthe play area..• Security lighting would be provided.

I
I Other Site Amenities
I • Three concrete picnic tables on concrete pads would be provided near the tots play area. One table and concrete pad would be ADA accessible.
• Two, one-piece concrete park benches would also be provided in thetotsplay area. • Sixtrash receptacles would beprovided in the tots play area, picnic areas, and restroom building. • One bicycle rack would be provided.
• A mow strip and a five-foot high chain linked fence around the Phase I area to define the park boundaries and development area would be provided.
• A sign would beposted identifying the main entrance to the park.

Landscape Planting and Irrigation
I
I
I • Landscape and irrigation improvements to the park would include, but not be limited to, turf, shrub, trees, and automatic irrigation system.
• All turfed areas would be drill-seeded.
• The irrigation system would include, but not be limited to, an automatic controller, automatic remote control valves, irrigation heads. and quick couplers.

I
l
] Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration (//(){)3 PI",. (",'."'~ Vt:S</txifl",'/I'/(I(' O/--:J/O:10_:$,4,11

Page 1 ends

I
I
I

1.0 Project Description
Restroom/Maintenance Building
I
• Approximately 350 square feetwould be provided for the restroom building, • Security lighting outside of the restroom building would be provided. All lighting fixtures would be required tominimize off-site illumination.
• A drinking fountain and public telephone would beprovided onthe exterior of the restroom building, • A storage area would be provided for maintenance equipment as part of the restroom building, as shown inFigure 2.

I Phase II Project Compollellts
I
I
Phase IIwould incorporate the development of the southern pad (approximately four acres) consisting of the following:site work, utilities, children's play area, site amenities (picnic tables, park benches, bicycle racks, etc.), multipurpose athletic field (including baseball and soccer), outdoor basketball court,jogging path with exercise equipment, landscape and irrigation, tennis court, grouppicnic shelter, and a IS-space parking lot,as shown inFigure 2. More detailed descriptions of these components are presented below.

I Walkways and Parking
I
I
• Walkways would be provided from the parking lot to the restroom building, the group and family picnic areas, and the school age children's play area.
• Bench seating at selected locations and a walking path along the perimeter of the park would be provided.
• Security lighting would be provided along the walkway. • Parking lot would be asphalt paved and accommodate 15vehicles, including handicap spaces. The parking lot would be sloped to prevent water puddles from forming after rains and irrigation.

Securitylighting (parking lot lighting) would be provided.

I
I
Children's Play Area
I
I
I
• The children's play area would be approximately 6,500 square feet and would be located on the PhaseIsite, as shown inFigure 2.
• Playground equipment suitable for children five through twelve would be provided adjacent to the totsplayarea. This area would have an identifiable separation. • The prime consideration inthe development of theplay area is thesafety and security of the children; designs would comply with ADA's Accessibility Guidelines for Play Areas for the Year 2000; these guidelines would also be provided for the pathway from the parking area to the children's play area. • Security lighting and seating foradult supervision would be provided intheplay area. • Curbswould be elevated aroundplay area to control surfacing material from flowing overthe curb.

Other Site Amenities
I • Familypicnic units would be installed with each unit containing one eight-foot concrete picnic table placed on a concrete slab.
• Agrouppicnic area would beprovided toaccommodate 40 to 50people; this would be located on the Phase I site, as shown in Figure 2. Each unit would provide eight-foot concrete picnic tables placed onconcrete slabs under a picnic shelter.
• Allpicnic areas would comply with ADA guidelines.

I
I
I ---------- - --------------------------Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration I" 'It ftfuM c"IIYOfiNt'gf/« (/ilf,,11~/« OIl."J/().." In '( ."

Page 1 ends

I
I
I
I
I
I
I
I
I
I
I
I
I
]
J

1.0 Project Descrlptlon
• One-piece concrete benches anchored to the concrete surface would be provided in the vicinity of the children's play area.
• Trash receptacles would beprovided in thenewly developed areas. • Two regulation horseshoe pits with redwood backboards would be provided; these would be located onthe Phase I site, as shown in Figure 2.
• A mow strip and five-foot high chain link fences necessary to complete the fencing around the perimeter of thepark would be provided.'"
Athletic Field
• The multipurpose athletic field would be located in an area with consideration of the adjacent residents.
• Two five-row bleachers, consisting of concrete bleacher pads, would be installed and permanently anchored to the concrete pads.
• Los Angeles County standard cage type backstop and brick dust would be provided; items that may create a hazard to the use of the field (i.e. valve boxes) would not be located and permitted in play areas.
• Irrigation headssuitable forthis use would be implemented. • The exterior wall of the restroom building would have onlofflighting controls.

Outdoor Basketball Court
• A concrete basketball court would be provided with two backboards. All lines and .dimensions would reflect the latest National Collegiate Athletic Association (NCAA) court layout. An unobstructed ten-foot area outside of the court would be provided.

Tennis Court
• A fencedregulated tennis court with two seatingbenches would be provided. This would be located on thePhase I site, as shown inFigure 2.

Jogging Path with Exercise Equipment
• A decomposed granite-jogging path with exercise stations would be provided. The exercise stations wouldbe composed of concrete and galvanized steel fixtures.

Landscape Planting and Irrigation
• Landscape and irrigation improvements to the park would include, but not be limited to, turf, shrub, trees, and automatic irrigation system.
• All turfed areas would be drill seeded.
• The irrigation system would include, but not be limited to automatic controller, automatic remote control valves irrigation heads, and quick couplers.

Flagpole
• A30·foot flagpolewould beplaced near thepark entrance. -----------------------------------------------------------------------Plum Canyon County Park Project Final Initial Study/Mitigated NegatIve Declaration Page 1-6 OI{)()SPI""'('dnl,onN.~/rt'I'h"}"I""OJc",,'I,' ":,' 1,11

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
J

1.0 Project Description

SCHEDULE
AccordingtotheLosAngelesCountyDepartmentofParksandRecreation,theproposedproject componentsinPhaseIareanticipatedtobeconstructedwithinasix-monthperiodandbecompletedby mid-2002.TheproposedprojectcomponentsinPhaseIIarecurrentlyunfundedbutwillbescheduled whenfundsareidentified.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration .II1(1(),'Ph,.. Commit,vt'glf« Ifim"I./<><,fir 'I II: 10::$.4.11

Page 1 ends

I
I
I
I
I
I
I
I
I
I
I
I.

I
I
I
I
I
I
~

2.0 Initial Study Checklist

2.0 INITIAL STUDYCHECKLIST
The following Environmental Checklist and discussion of potential environmental effects were completed in accordance with Section 15063(d)(3) of the CEQA Guidelines (October 1998)to determine if theproject may have any significant effect on the environment.

A brief explanation is provided for all determinations. A "No Impact" or "Less than Significant Impact" determination is made when the project will not have any impact or will not have a significant effect on the environment for that issuearea based on a project-specific analysis.

CEQA ENVm.ONMENTAL CHECKLIST FORM AND INITIAL STUDY

1. Project Title: Plum Canyon CountyPark Project

2. Lead Agency Name and Address: County of LosAngeles
433 South Vermont Avenue, 4thFloor
Los Angeles, CA 90020

3. Contact Person and Phone Number: Larry Hensley
County of Los,Angeles
Department of Parks and Recreation
(213) 738-2965

4. Project Location: 28222North Via Joyce Drive

5. Project Sponsor's Name and Address: County of Los Angeles .

Department of Parks and Recreation
433 SouthVermont Avenue, 4thFloor
LosAngeles, CA 90020

6. General Plan Designation: The general plan land use designation forthe site isUrban 1,which allows for low-density
residential development (1.1 to 3.3 unitsper
acre).

7. Zoning: The site was originally zoned as Hillside
Management but later re-classified as
Residential Planned Development (RPD). The
lot is located onTrack No. 37801, whichisa
unit ofparent TrackNo. 31158.

8. Description of Project:

The proposed project would result in the conversion of approximately 7 of the 13acres of undeveloped land into a passive and active year-round public park. The project site is comprised of two relatively flat pads, one in the northern end and the other in the southern end of the project site; correspondingly, the proposed project would be divided into two phases. Funding for Phase II is not available at this time; however, for the purpose of this environmental document, Phase II is assumed to be implemented immediately following thedevelopment of Phase I.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/OO3PluntG'''.''OffN.:gt.I«f/i"l/!l4!f\H "~":/('.':J.UI

Page 2 ends

I
I
I

2.0 Initial Study Checklist
Phase I Pro;ect Compollellts
I
I
Phase I involves the development of the northern pad (approximately three acres) and would consist of the following: walkways, utilities, tots play area, site amenities (picnic tables, park benches, bicycle racks, etc.), landscape and irrigation, restrooms/maintenance area, a IS-space parking lot, security lighting, and signage, as shown in Figure 2. More detailed descriptions of these components are presented in Section 1.0.

Phase II Project Compollellts
I
I
Phase II would incorporate the development of the southern pad (approximately four acres) consisting of the following: site work, utilities, children's play area, site amenities (picnic tables, park benches, bicyc1~ racks, etc.), multipurpose athletic field (including baseball and soccer), outdoor basketball court,jogging path with exercise equipment, landscape and irrigation, tennis court, group picnic shelter, a l'S-spa~. parking lot, and a flagpole, as shown in Figure 2. More detailed descriptions of these componentsan:
presented in Section to.

I
I

9. Surrounding Land Usesand Setting:

The project site issituated inaresidential area. Surrounding land uses consist primarily of single-family residential development, as shown inFigures 3 to 6.

10. Other agencieswhoseapproval isrequired:

I Prior to project construction, permits may need to be obtained from the two state regulatory agencies identified below. The required permits are for theproposed construction in an area identified as"CDFG­ jurisdictional drainages" (see Section 3.IV, Biological Resources, for discussion) and for surface waters (see Section 3.VIII,Hydrology and Water Quality).I
I • California Department ofFish and Game (CDFG), 1601Streambed Alteration Agreement • Regional Water Quality Control Board (RWQCB), Section 401 Permit andNational Pollution Discharge Elimination System(NPDES) Construction Permit I
I
I
I
I
~
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Deelaratlon 011)l)JPit""(""..'O~Nrgol«f/1nlll)..J« OI':J/O:10':.',loll

Page 2 ends

J

---------------------_-_---- __ ------------
I
I
I
I
I
I
I
View of the Phase Isite looking southwest.

I
I
I II
I I
IIIII
I I
I
View ofthe Phase Iand Phase IIsites looking north.

Figure 3
Viewsof the Project Site
Plum Canyon CountyPark01008 Plum Canyon\Figllres\Fig3 Views 1/1/5/00 I

I
I
I
I
I
Plum Canyon County Park
01008 Plum Canyotl\Figllre.,\Fig4 £.,isritlg 11115/00
I
View at the Phase Isite looking southwest.

I .',- ~" ···'t..

I
I
I Manholeon the southern portion ofthe Phase IIsite.

I
I
Figure 4
Existing On-Site Features

Plum Canyon County Park01008Plum (III,VVJ1\Figlfl't's\Fig5We-J',Silt.'11115100 I
I
I
I
I
I
I
I
I View looking west on Jerry Place.

I
I
I
I
I
I
View lookingwest on Werren Place.

I Figure 5
Existing Single-Family Residences
West of the Project Site

I
I
I
I
I
I
I View looking north.

I
I
I
I
I
I
View looking south.

I Figure 6
Single-Family Residences
North and South of the Project Site
I Plum Canyon County Park
01008 Phnn CanyonlFigllreslFig6 SouthSite 111/5/00
I

I
I

2.0 Initial Study Checklist

ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
I
I
I
The environmental factorschecked below would be potentially affected by this project, involvingat least one impact that is a "Potentially Significant Impact" as Indicated by the checklist on the followingpages:

I
I
o Aesthetics
oBiologicalResources
o Hazards& HazardousMaterials
D MineralResources
D PublicServices
D UtilitiesI ServiceSystems
oAgricultureResources
D CulturalResources
D HydrologyIWaterQuality
D Noise
D Recreation
o MandatoryFindingsofSignificance
o AirQuality
D GeologyI Soils
oLandUseIPlanning
oPopulationIHousing
oTransportationITraffic
DETERMINATION: (Tobe completed by lead agency)
On thebasis of this initial evaluation:

I
I
D IfindthattheproposedprojectCOULDNOThaveasignificanteffectontheenvironment,anda NEGATIVEDECLARATIONwillbeprepared.

I
I
I
I
[g] Ifindthatalthoughtheproposedprojectcouldhaveasignificanteffectontheenvironment,therewillnot beasignificanteffectinthiscasebecauserevisionsintheprojecthavebeenmadebyoragreedtobythe projectproponent.AMITIGATEDNEGATIVEDECLARATIONwillbeprepared.

D IfindthattheproposedprojectMAYhaveasignificanteffectontheenvironment,andan ENVIRONMENTALIMPACTREPORTisrequired.

I
D IfindthattheproposedprojectMAYhavea"potentiallysignificantimpact"or"potentiallysignificant unlessmitigated"impactontheenvironment,butatleastoneeffect1)hasbeenadequatelyanalyzedinan earlierdocumentpursuanttoapplicablelegalstandards,and2)hasbeenaddressedbymitigationmeasures basedontheearlieranalysisasdescribedonattachedsheets.An ENVIRONMENTALIMPACT REPORTisrequired,butit mustanalyzeonlytheeffectsthatremaintobeaddressed.

D Ifindthatalthoughtheproposedprojectcouldhaveasignificanteffectontheenvironment,becauseall potentiallysignificanteffects(a)havebeenanalyzedadequatelyinanearlierEIRorNEGATIVE DECLARATIONpursuanttoapplicablestandards,and(b)havebeenavoidedormitigatedpursuanttothat earlierEIRorNEGATIVEDECLARATION,includingrevisionsormitigationmeasuresthatareimposed upontheproposedproject,nothingfurtherisrequired.

I
I Signature Date
I Printed Name For
I
~
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration • Ol()(),jPlumCm,,'OnNrgJ«:lft'rol}.•IO('OII:JIO:III:$,,1.11

Page 2 ends

I 2.0 InitialStudyChecklist

I EVALUATIONOFENVIRONMENTALIMPACTS
LessThan
I Significant
Potentially With LessThan
Significant Mitigation Significant No
Issues(andSupportingInformationSources): lml!.a~ la'2rJl.Qratia.n ltnrza'l ~ I I. AESTHETICS- Wouldtheproject:
a) Haveasubstantialadverseeffectonascenicvista? 0 0 0
I b) Substantiallydamagescenicresources.including.but
notlimitedto.trees.rockoutcroppings,andhistoric
I buildingswithinastatescenichighway? 0 0 0
c) Substantiallydegradetheexistingvisualcharacteror
I qualityofthesiteanditssurroundings? 0 0 [gI .0
d) Createanewsourceofsubstantiallightorglarewhich
wouldadverselyaffectdayornighttimeviewsinthe
0I area? 0 [3
II. AGRICULTURERESOURCES: Indeterminingwhether
I impactstoagriculturalresourcesaresignificant
environmentaleffects.leadagenciesmayrefertothe
CaliforniaAgriculturalLandEvaluationandSite
AssessmentModelpreparedbytheCaliforniaDepartment
I ofConservationasanoptionalmodeltouseinassessing
impactsonagricultureandfarmland.Wouldtheprojeet:
a) ConvertPrimeFarmland.UniqueFarmland.or
I FarmlandofStatewideImportance(Farmland),as
shownonthemapspreparedpursuanttotheFarmland
MappingandMonitoringProgramoftheCalifornia
0 0 0
I ResourcesAgency.tonon-agriculturaluse?
b) Conflictwithexistingzoningforagriculturaluse.ora
I WilliamsonActcontract? 0 0 0
c) Involveotherchangesintheexistingenvironment
which.duetotheirlocationornature.couldresultin
I conversionofFarmland.tonon-agriculturaluse? 0 0 0 [gI III. AIRQUALITY: Whereavailable.thesignificancecriteria I establishedbytheapplicableairqualitymanagementorair
pollutioncontroldistrictmaybereliedupontomakethe
followingdeterminations.Wouldtheproject:

I a) Conflictwithorobstructimplementationofthe
applicableAirQualityAttainmentPlan? 0 0 0
I b) Violateanyairqualitystandardorcontributetoan
existingorprojectedairqualityviolation? 0 0 0
I
~
PlumCanyonCountyParkProjectFinalInitialStudy/Mitigated'NegatlveDeclaration Page2-80100,'PI".. ClIO''''N<gtI.../fi."I).J« 01/:.1/0:10.:.' fll

I 2.0InitialStudyChecklist
I LessThan
Significant
I Potentially With LessThan
SIgnificant Mitigation Significant No
Issues(andSupportingInformationSources): Imnact Incomgrqlioa Impact .l!EJl.W_ I III. AIRQUALITY- (cont.):
c) Resultinacumulativelyconsiderablenetincreaseof
anycriteriapollutantforwhichtheprojectregionis
I non-attainmentunderanapplicablefederalorstate
ambientairqualitystandard(includingreleasing
emissionswhichexceedquantitativethresholdsfor
I ozoneprecursors)? D D D
d) ExposesensitivereceptorstosubstantialpO,llutant
concentrations? D D D
I e) Createobjectionableodorsaffectingasubstantial
numberofpeople? D 0 0 [gI
I IV. BIOLOGICALRESOURCES- Wouldtheproject:
a) Haveasubstantialadverseeffect,eitherdirectlyor
I throughhabitatmodifications,onanyspeciesidentified
asacandidate,sensitive,orspecial-statusspeciesin
localorregionalplans,policies,orregulations,orby
(~:?I theCaliforniaDepartmentofFishandGame~,rU.S.
0 0 0FishandWildlifeService?
b) Haveasubstantialadverseeffectonanyriparianhabitat • +.

I orothersensitivenaturalcommunityidentifiedinlocal
orregionalplans,policies,regulationsorbythe ",I. ..CaliforniaDepartmentofFishandGameorU.S.Fish 0 ([gI) '0
I andWildlifeService? D
c) Haveasubstantialadverseeffectonfederallyprotected J
I
wetlandsasdefinedbySection404oftheCleanWater
Act(including,butnotlimitedto,marsh,vernalpool,
coastal,etc.)throughdirectremoval,filling,
hydrologicalinterruption,orothermeans? 0 0 0
I d) Interferesubstantiallywiththemovementofanynative
residentormigratoryfishorwildlifecorridors,or
I impedetheuseofnativewildlifenurserysites? 0 0 0
e) Conflictwithanylocalpoliciesorordinancesprotecting
biologicalresources,suchasatreepreservationpolicy
0 0I orordinance? 0
f) ConflictwiththeprovisionsofanadoptedHabitat
~
ConservationPlan,NaturalConservationCommunity
Plan,orotherapprovedlocal,regional,orstatehabitat
0 0conservationplan? 0
~
J PlumCanyonCountyParkProjectFinalInitialStudy/MitigatedNegativeDeclaration Page2-90/{)()3Pl.m c"",,,,,.v<gJ«1fj..t1),,/« 0/1:.110:/o,:s.1,11

I 2.0 InitialStudyChecklist
I LessThan
Significant
I Potentially With LessThan
Significant Mitigation Significant No
Issues(andSupportingInformationSources): Imoact Incomoratlon (maact .iJJJIlIJsL I V. CULTURAL RESOURCES -- Would the project:
a) Causeasubstantialadversechangeinthesignificance
ofahistoricalresourceasdefinedin§15064.5? 0 0 0
I b) Causeasubstantialadversechangeinthesignificance
of'auniquearchaeologicalresourcepursuantto
I §15064.5? 0 0 0
c) Directlyorindirectlydestroyauniquepaleontological
I resourceorsiteoruniquegeologicfeature? 0 0 0
d) Disturbanyhumanremains,includingthoseinterred
outsideofformalcemeteries? 0 0 0
I VI. GEOLOGY AND SOILS -- Would the project:

I a) Exposepeopleorstructurestopotentialsubstantial
adverseeffects,includingtheriskof'toss,injury,or
0 0deathinvolving: 0
I i) Ruptureofaknownearthquakefault,as
delineatedonthemostrecentAlquist-Priolo
EarthquakeFaultZoningMapissuedbytheState
Geologistfortheareaorbasedonother
I substantialevidenceofaknownfault?Referto
DivisionofMinesandGeologySpecial
0 0 [gJ 0Publication42.

I ii) Strongseismicgroundshaking? 0 0 [gJ 0
iii) Seismic-relatedgroundfailure,including
I liquefaction? 0 0 [gJ 0
0 0 . [gJ 0iv) Landslides?
I b) Resultinsubstantialsoilerosionorthelossoftopsoil? 0 0 [gJ 0 c) Belocatedonstrataorsoilthatisunstable,orthai
I
wouldbecomeunstableasaresultoftheproject,and
potentiallyresultinon-oroff-sitelandslide,lateral
0 0 0spreading,subsidence,liquefaction,orcollapse?
I d) Belocatedonexpansivesoil,asdefinedinTable18-1-
BoftheUniformBuildingCode,creatingsubstantial
0 0 0riskstolifeorproperty?
I
I
~
PlumCanyonCountyParkProjectFinalInitialStudy/MitigatedNegativeDeclaration Page2-10 OIOOJPlUMG,n",,,N<'J'I«/fl...I/doc OIl:JIO:10::S,lM

I 2.0 InitialStudyChecklist
I LessThan
Significant
I Potentially With LessThan
Significant Mitigation Significant No
Issues(andSupportingInformationSources): Impact lncorporatjon Impact .I!!!JzarL I VI. GEOLOGY AND SOILS - (cont.):
e) Havesoilsincapableofadequatelysupportingtheuse
ofseptictanksoralternativewastewaterdisposal
I systemswheresewersarenotavailableforthedisposal
ofwastewater? 0 0 0
I VII. HAZARDSANDHAZARDOUSMATERIALS- Would
theproject:
a) Createasignificanthazardtothepublicorthe
I environmentthroughtheroutinetransport,use,or
0disposalofhazardousmaterials? 0 0 [81
I b) Createasignificanthazardtothepublicorthe
environmentthroughreasonablyforeseeableupsetand
accidentconditionsinvolvingthereleaseofhazardous
materialsintotheenvironment? 0 0 0
I c) Emithazardousemissionsorhandlehazardousor
acutelyhazardousmaterials,substances,orwastewithin
I one-quartermileofanexistingorproposedschool? 0 0 ,[81 0 d) Belocatedonasitewhichisincludedonalistof
hazardousmaterialssitescompiledpursuantto
I GovernmentCodeSection65962.5 and,asaresult,
woulditcreateasignificanthazardtothepublicorthe
0 [81environment? 0 0
I e) Foraprojectlocatedwithinanairportlanduseplanor,
wheresuchaplanhasnotbeenadopted,withintwo
I milesofapublicairportorpublicuseairport,wouldthe
projectresultinasafetyhazardforpeopleresidingor
0 0 0 [81workingintheprojectarea?
I f) Foraprojectwithinthevicinityofa privateairstrip,
wouldtheprojectresultinasafetyhazardforpeople
0 0 0residingorworkingintheprojectarea?
I g) Impairimplementationoforphysicallyinterferewithan
adoptedemergencyresponseplanoremergency
evacuationplan? '0 0 0
I h) Exposepeopleorstructurestoasignificantriskofloss,
injuryordeathinvolvingwildlandfires,including
I wherewildlandsareadjacenttourbanizedareasor
0 0 0whereresidencesareintermixedwithwildlands?
I
I PlumCanyonCountyParkProjectFinalInitialStudy/MitigatedNegativeDeclaration Page2-11oUJ(}JPI"", ("".,,,,, ,Vrg./rt'1fl",'II.J~ 011:)10: 10::S.4.11

I 2.0 InitialStudyChecklist
I LessThan
Significant
I Potentially With LessThan
Significant Miligalion Significanl No
Issues(andSupportingInformationSources): [mpaci Incorporation Impaci ~ I VIII. HYDROLOGYANDWATERQUALITY- Wouldthe
project:
a) Violateanywaterqualitystandardsorwastedischarge
I requirements? 0 0 0
b) Substantiallydepletegroundwatersuppliesorinterfere
I substantiallywithgroundwaterrechargesuchthatthere
shouldbeanetdeficitinaquifervolumeora'Iowering
ofthelocalgroundwatertablelevel(e.g.,theproduction
rateof'pre-existingnearbywellswoulddroptoalevel
I whichwouldnotsupportexistinglandusesorplanned
.~usesforwhichpermitshavebeengranted)? 0 0 0
I c) Substantiallyaltertheexistingdrainagepatternofthe
siteorarea,includingthroughthealterationofthe
courseofastreamorriver,inamannerwhichwould
resultinsubstantialerosionorsiltationon-oroff-site? 0 0 0 I d) Substantiallyaltertheexistingdrainagepatternofthe
siteorarea,includingthroughthealterationofthe
I courseofastreamorriver,orsubstantiallyincreasethe
rateoramountofsurfacerunoffinamannerwhich
wouldresultinfloodingon-oroff-site? 0 0 0
I e) Createorcontributerunoffwaterwhichwouldexceed
thecapacityofexistingorplannedstormwaterdrainage
systems? 0 0 ~ 0
I f) Otherwisesubstantiallydegradewaterquality? 0 0 ~ 0 I g) Placehousingwithina lOO-yearfloodhazardareaas
mappedonafederalFloodHazardBoundaryorFlood
InsuranceRateMaporotherfloodhazarddelineation
I map? 0 0 0 ~
h) Placehousingwithina lOO-yearfloodhazardarea
structureswhichwouldimpedeorredirectfloodflows? 0 0 0
I i) Exposepeopleorstructurestoasignificantriskofloss,
injuryordeathinvolvingflooding,i,ncludingfloodingas
0 0 0 [8J
I aresultofthefailureofaleveeordam?
j) Inundationofseiche,tsunami,ormudflow? 0 0 0 [8J
I IX. LANDUSEAI"lDPLAI"lNING- Wouldtheproject:
a) Physicallydivideanestablishedcommunity? 0 0 0
~
J PlumCanyonCountyParkProjectFinalInitialStudy/MItigatedNegativeDeclaration Page2-120100JPI.",C"'~I"nNtg</~1fi",,1},dO<'01l:J,'O:10,-:.'1,11

I 2.0InitialStudyChecklist
I LessThan
Significant
I Potentially With LessThan
Significant Mitigation Significant No
Issues(andSupportingInformationSources): Impact lncorportltion Impnct .l!!!JHW_ I IX. LAl."lDUSEANDPLANNING- (cont.):
b) Conflictwithanyapplicablelanduseplan,policy,or
regulationofanagencywithjurisdictionoverthe
I project(including,butnotlimitedtothegeneralplan,
specificplan,localcoastalprogram,orzoning
ordinance)adoptedforthepurposeofavoidingor
I mitigatinganenvironmentaleffect? 0 0 0
c) Conflictwithanyapplicablehabitatconservationplan
ornaturalcommunitiesconservationplan? 0 0 0
I X. MINERALRESOURCES- Wouldtheproject:

I a) Resultinthelossofavailabilityofa knownmineral
resourcethatwouldbeofvaluetotheregionandthe
residentsofthestate? 0 0 0
I b) ResultinthelossofavailabiIityofa locally-important mineralresourcerecoverysitedelineatedonalocal
0generalplan,specificplan,orotherlanduseplan? 0 0
I XI. NOISE- Wouldtheproject result in:
a) Exposureofpersonstoorgenerationofnoiselevelsin
I excessofstandardsestablishedinthelocalgeneralplan
ornoiseordinance,orapplicablestandardsofother
0 0agencies? 0
I b) Exposureofpersonstoorgenerationofexcessive
groundbomevibrationorgroundbomenoiselevels? 0 0 0
I c) Asubstantialpermanentincreaseinambientnoise
levelsintheprojectvicinityabovelevelsexisting
0 0 0withouttheproject?
I d) Asubstantialtemporaryorperiodicincreaseinambient
noiselevelsintheprojectvicinityabovelevelsexisting
withouttheproject? 0 (gJ 0 0
I e) Foraprojectlocatedwithinanairportlanduseplanor,
wheresuchaplanhasnotbeenadopted,withintwo
I milesofapublicairportofpublicuseairport,wouldthe
projectexposepeopleresidingorworkingintheproject
0 0 0areatoexcessivenoiselevels?
I t) Foraprojectwithinthevicinityofa privateairstrip,
wouldtheprojectexposepeopleresidingorworkingin
theprojectareatoexcessivenoiselevels? 0 0 0
I
J PlumCanyonCountyParkProjectFinalInitialStudy/MitigatedNegativeDeclaration Page2·13(//0'" PI,,,,,Om,,,,."v~/«,lli""II.t,,, III:.111:10::$ ,1.11

I 2.0 Initial Study Checklist
I LessThan
Signljieant
I Potentially With LessThan
Signljicant Mitigation Significant No
Issues(andSupportingInformationSources): {mpnet Incomoratlon (mpnct ~ I XII. POPULATIONAi"IJDHOUSING- Wouldtheproject:
a) Inducesubstantialpopulationgrowthinanarea,either
directly(forexample,byproposingnewhomesand
I businesses)orindirectly(forexample,through
extensionofroadsorotherinfrastructure)? D D D
I b) Displacesubstantialnumbersofexistinghousing,
necessitatingtheconstructionofreplacementhousing
D D Delsewhere?
I c) Displacesubstantialnumbersof'peoplenecessitatingtlle 0constructionofreplacementhousingelsewhere? D D
I XIII. PUBLICSERVICES-
a) Wouldtheprojectresultinsubstantialadversephysical
impactsassociatedwiththeprovisionofnewor
I physicallyalteredgovernmentalfacilities,needfornew
orphysicallyalteredgovernmentalfacilities.the
constructionofwhichcouldcausesignificant
I environmentalimpacts,inordertomaintainacceptable
serviceratios,responsetimes,orotherperformance
objectivesforanyofthepublicservices:

I Fireprotection? D D 18I D
Policeprotection? D D 18I 0
Schools? 0 0 0 18I
I Parks? 0 0 0 18I
Otherpublicfacilities? 0 0 0 18I
I XIV. RECREATION-
a) Wouldtheprojectincreasetheuseofexisting
I neighborhoodandregionalparksorotherrecreational
facilitiessuchthatsubstantialphysicaldeteriorationof
0 0 0thefacilitywouldoccurorbeaccelerated?
I b) Doestheprojectincluderecreationalfacilitiesor
requiretheconstructionorexpansionofrecreational
I facilitieswhichmighthaveanadversephysicaleffect
0 0ontheenvironment? 0
I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration Page 2-14 OIOOfPI"", (~,.,I'O. N<grl«Iji'''/) Joc 01/:.';0: 10;:S HI

I 2.0InitialStudyChecklist
I LessThan
Signljicanl
I Potentially Willi LessThan
Signljicant Mitigation Signiflcant No
Issues(andSupportingInformationSources): Impact Incorporation Impnct .l!!!Jz!& I XV. TRANSPORTATIONI TRAFFIC- Wouldtheproject:
a) Causeanincreaseintrafficwhichissubstantialin
relationtotheexistingtrafficloadandcapacityofthe
I streetsystem(i.e.,resultinasubstantialincreasein
eitherthenumberofvehicletrips,thevolume-to-
capacityratioonroads,orcongestionatintersections)? 0 0 0 I b) Exceed,eitherindividuallyorcumulatively,alevelof
servicestandardestablishedbythecountycongestion
I managementagencyfordesignatedroadsorhighways? 0 0 [gJ 0 c) Resultinachangeinairtrafficpatterns,includingeither
anincreaseintrafficlevelsorachangeinlocationthat
0 [gJ
I resultsinsubstantialsafetyrisks? 0 0
d) Substantiallyincreasehazardstoadesignfeature(e.g.,
I sharpcurvesordangerousintersections)or
[gJincompatibleuses(e.g.,farmequipment)? 0 0 0
e) Resultininadequateemergencyaccess? 0 0 D. [gj
I t) Resultininadequateparkingcapacity? 0 0 [gJ 0
I g) Conflictwithadoptedpoliciessupportingalternative
0 0 0transportation(e.g.,busturnouts,bicycleracks)?
I XVI. UTILITIESANDSERVICESYSTEMS- Wouldthe
project:
a) Exceedwastewatertreatmentrequirementsofthe
I applicableRegionalWaterQualityControlBoard? 0 0 0
b) Requireorresultintheconstructionofnewwateror
wastewater treatmentfacilitiesorexpansionofexisting
I facilities,theconstructionofwhichcouldcause
signiticantenvironmentaleffects? 0 0 0
-I c) Requireorresultintheconstructionofnewstormwater
drainagefacilitiesorexpansionofexisting.facilities,the
constructionofwhichcouldcausesignificant
I environmentaleffects? D' 0 0
d) Havesufficientwatersuppliesavailabletoservethe
projectfromexistingentitlementsandresources,orare
0 0 (gJ 0I neworexpandedentitlementsneeded?
I f<\,~~.~;0/
l\' I~
I PlumCanyonCountyParkProjectFinalInitialStudy/MitigatedNegativeDeclaration Page2-150100&PI"",(1,,,\ ~" , ,.,/,,,/,>(, 01l:J/0:10::.'.1.11

I
I

2.0InitialStudyChecklist
LessThan
Significant
Potentially With LessThan
Significant Mitigation Significant No
Issues(andSupportingInformationSources): Impact Incorporation Imnact .l!JmIJ.rL XVI. UTILITIESANDSERVICESYSTEMS- (cont.):
e) Resultinadeterminationbythewastewatertreatment
providerwhichservesormayservetheprojectthatit
hasadequatecapacitytoservetheproject'sprojected
demandinadditiontotheprovider'sexisting
commitments? 0 0 0
f) Beservedbyalandfillwithsufficientpermitted
capacitytoaccommodatetheproject'ssolidwaste
disposalneeds? 0 D ~ 0
g) Complywithfederal,state,andlocalstatutesand
regulationsrelatedtosolidwaste? D 0 ~ 0
XVII. MAi"lDATORYFINDINGSOFSIGNIFICANCE
a) Doestheprojecthavethepotentialtodegradethe
qualityoftheenvironment,substantiallyreducethe
habitatofafishorwildlifespecies, causeafishor
wildlifepopulationtodropbelowself-sustaininglevels,
threatentoeliminateaplantoranimalcommunity,
reducethenumberorrestricttherangeofarareor
endangeredplantoranimaloreliminateimportant
examplesofthemajorperiodsofCaliforniahistoryor
0 D 0prehistory?
b) Doestheprojecthaveimpactsthatareindividually
limited,butcumulativelyconsiderable?("Cumulative
considerable"meansthattheincrementaleffectsofa
projectareconsiderablewhenviewedinconnection
withtheeffectsofpastprojects,theeffectsofother
currentprojects,andtheeffectsofprobablefuture
0 0 0projects)?
c) Doestheprojecthaveenvironmentaleffectswhichwill
causesubstantialadverseeffectsonhumanbeings,
0eitherdirectlyorindirectly? D 0
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I PlumCanyonCountyParkProjectFinalInitialStudy/MitigatedNegativeDeclaration01003PI.,. (',m". "'''11<1,,(,((1",<I}.J""oU:J:O: 11):'<HI Page2-16
I

I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures I
I

3.0 DISCUSSIONOFENVIRONMENTALIMPACTS

ANDMITIGATION MEASURES
I. AESTHETICS
Would the proposal:

I
I
a) Have a substantial adverse effect on a scenic vista? I
NoImpact. The project site is located in an area characterized bysingle-family residences andscrub covered hillsides (see Figures 3 to 6). The project site occupies an undeveloped lot that is only visible from a few nearby streets and overlooking residences. There are no designated scenic vistas or highways in the immediate vicinity of the project site; therefore, impacts to a scenic vista would not occur. No mitigation measures arerequired.

I
I
b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
I
No Impact. There are over 1,200 miles of State designated scenic highway in California. The nearest State designated scenic highway, Angeles Crest Highway (Highway 2), is located approximately 20 miles southeast of theproject site in the San Gabriel Mountains. The project site is not visible from this or any other designated scenic highway; therefore, no impacts would occur, and nomitigation measures are required.
c) Substantially degrade the existing visual character or quality ofthe site and its surroundings?, .

I Less Than Significant Impact. As shown in Figure 3, the project site is currently undeveloped.

The project site is characterized by two terraces which are separated by a small slope crossing the northern third of the site. The northern or "upper" terrace would be developed under Phase I, whereas the southern or "lower" terrace would remain undeveloped until Phase II. Both terraces would be visible from at least five residences to the north and three residences to the east which overlook the site. The park would also be visible at ground level from numerous residences along Via Joyce Drive, Werren Place, Arthur Court, Adriene Way, and Jerry Place, as shown in Figures 3 andS.

I
I
I
I
A few acres of disturbed coastal sage scrub habitat would be converted to parkland as a result of the proposed project. The currently undeveloped open space would be replaced with recreational amenities, including a tennis court, basketball court, a multi-purpose field (baseball diamond and soccer field), children's play area/tot lot, picnic area, and other facilities. This would alter the visual character of the project site from its natural condition to a developed, albeit open space, condition.

However, the public park would not' degrade the existing visual character of the site and its surroundings. Public parks are aesthetically consistent with single-family residential communities, such as the neighborhood around the project site. The surrounding hillsides would remain in their current open space condition, providing a natural buffer between the park and the residences to the north and east. Visual impacts would be less than significant; therefore, no mitigation measures are required.

I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100.1Ph,,. ('''.''()~ N<g<[(~1fl~"I).JQ('01l:J/O: 10::.1,1.11

Page 3 ends

I 3.0 Discussion of Environmental Impacts and Mitigation Measures I
I
I
I
d) Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
Less Than Significant Impact. The proposed Plum Canyon Park would have security lighting along the pathways, at the restroom, and in the parking lot. No other nighttime lighting is proposed for the project; therefore, impacts associated with light and glare would be lessthan significant.

II. AGRICULTURE RESOURCES
Would the project:

I a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? b) Conflict with existing zoning for agricultural usc, or a Williamson Act contract? c) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use? I
I No Impact. The project site isnot zoned for agricultural uses. There areno agricultural resources or operations on the project site or on adjacent properties, which are,open space or support residential uses. No landsare enrolled under the Williamson Act. No mitigation measures are required.

I III. AIR QUALITY
I
I
Would the project:

I
I
a) Conflict with or obstruct implementation of the applicable Air Quality Attainment Plan? b) Violate any air quality standard or contribute to an existing or projected air quality violation? c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)?
I
Less Than Significant Impact. The project site is located in the Los Angeles County sub-area of the South Coast Air Basin, Los Angeles County is designated as a non-attainment area for ozone (03), carbon monoxide (CO), nitrogen oxides (NO,J, and particulates (PM1o). The South Coast Air Quality Management District (SCAQMD), the regional agency empowered to regulate stationary sources, maintains an extensive air quality monitoring network to measure criteria pollutant concentrations throughout the South Coast Air Basin. The closest air monitoring station is located in the City ofSanta Clarita, approximately fivemiles southwest of theproject site.

I
I
State and Federal agencies have set ambient air quality standards for various pollutants. Both California Ambient Air Quality Standards (CAAQS) and National Ambient Air Quality Standards (NAAQS) have been established to protect the public health and welfare. The federal and State ambient airquality standards are presented inTable 1. The air quality impactswere evaluated using I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100$PI.",c.,."".N~« 1ft,,"I.t<><"!'II :.' ,(to'10::5,HI

Page 3 ends

I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
]

3.0 Discussion of Environmental Impacts and Mitigation Measures TABLEt

FEDERAL AND STATE AMBIENT AIR QUALITY STANDARDS
Averaging Federal State
Pollutant Time Standard Standard
Ozone (03) l-hour 0.12 ppm 0.9 ppm
Carbon Monoxide (CO) l-hour 35ppm 20.0 ppm
8-hour 9.0ppm 9.0 ppm
Nitrogen Oxides (NO;() l-hour 0.053 ppm 0.25 ppm
Particulates (PMJO) 24-hour 150~g/m3 50~g/m3
ppm- parts per million; J.lg/m3- micrograms per cubic meter SOURCE: California Air ResourcesBoard,AirQualityDataSummary,1997. the thresholds of significance established by the SCAQMD and presented in the CEQA Air Quality Handbook.I
Construction Emissions
The SCAQMD's thresholds of significance for the criteria pollutants arc shown on Table 2. Minor air contaminant emissions during the worst-case period, i.e., during construction activities, would result from the use of construction equipment and trips generated by construction workers and haul/material delivery trucks. Construction equipment used for conducting the proposed improvements would primarily consist of one loader, one dozer, one backhoe, one water pump, one concrete pump, one paver, and one truck crane. It is anticipated that up to six months would be required to complete the proposed improvements under Phase I and another six months to complete the proposed improvementsunder Phase II. Project related construction emissions would have a temporary less than significant effect on air quality in the vicinity of theproject (seeTable 3).

TABLE 2

SCAQMD AIR QUALITY IMPACT SIGNIFICANCE THRESHOLDS
Project Construction Project Operation
Carbon Monoxide (CO)
Reactive Organic Compounds (ROC)
Nitrogen Oxides (NOx)
Particulates (PMIO)
550lbslday
75lbslday
IOOlbslday
I501bslday
550lbslday
551bs/day
551bs/day
I501bslday
Note: Nosignificancethresholdisestablishedforozoneasitisnotemitteddirectlybutisasecondarypollutant producedintheatmospherethroughacomplexseriesofphotochemicalreactionsinvolvingreactiveorganic compounds(ROC)andnitrogenoxides(NOx)'
lbs/day-poundsperday.

Source: South CoastAir Quality ManagementDistrict, CEQAAirQualilYHandbook,April 1993.

SouthCoastAirQualityManagementDistrict,CEQAAir Quality Handbook,April1993.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Dec:laratlon olm PlumC"tm.'""Ncyrltc(/i'HI/Moc 011:],0: Uk:' 1,1(

Page 3 ends

I
I
I
I
I
I
I
I
I
,I
1 I
I
I
I
I
I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures TABLE 3

PROJECT-RELATED CONSTRUCTION EMISSIONS
Estimated Emissions (lbslday)
Construction Activity (Approximate Durationt CO ROC NO.5 PM~ SiteClearance/Preparation/Grading(onemonth)
Constructionequipment" 0.00 4.68 67.20 4.79
Constructionworkers'trips" 20.43 1.74 4.38 1.37
Dumptruck'' 2.25 0.09 0.46 0.09
Grading(PhaseI1PhaseU)C 2.64/3.52
TotalSiteClerance/Prep/GradingEmissions 22.68 6.51 72.04 8.89/9.77 ConstructionofParkComponents(twomonths)
Constructionequipment" 0.00 6.21 81.00 6.11
Constructionworkers'trips" 20.43 1.74 4.38 1.37
Materialdeliverytrucks' 11.25 0.43 2.31 0.45
TotalConstructionofParkComponentsEmissions 3/.68 8.38 87.69 7.93 LandscapingandOtherExteriorFinishes(threemonths)
Constructionequipment" 0.00 1.20 13.60 1.12
Constructionworkers'trips" 20.43 1:74 4.38 1.37
Materialdeliverytrucks'' 11.25 0.43 2.31 0.45
TotalLandscaping/OtherExt.FinishesEmissions 3/.68 3.37 20.29 2.94 DailyThresholdsforConstructionEmissions(lbs/day) 550 75.' 100 150 Doemissionsexceedsignificancethresholds? No No No No
a. Assumesthesameconstructionschedule(period)forPhaseIin2001andforPhaseIIin2002. b. Assumestheuseofthefollowingpiecesofconstructionequipment(8hours/day):1backhoe,1doier,1loader,1waterpump. c. Assumes1Sconstructionworkers,twotripsperworkerand40milespertrip(50%autosand50%light-dutytruck). d. Assumesonedumptruck,twotripsperdayand40milespertrip(100%heavy-dutytrucks). e. AssumesthreeacresofdisturbanceforPhaseIandfouracresforPhaseII;26.4poundsofPMloperacrespreadover30days. f. Assumestheuseofthefollowingpiecesofconstructionequipment(6hours/day):1backhoe,1dozer,1loader,1waterpump,1concrete pump,1paver,J truckcrane.
g. Assumes5materialdeliverytrucks,twotripspertruckand40milespertrip(100%heavy-dutytrucks). h. AssumestheuseofI truckcrane8hoursperday.

Source: CaliforniaAirResourcesBoard.URBEMIS7G(Version3.1),August1998;SouthCoastAirQualityManagementDistrict,CEQAAir QualityHandbook,April1993;CountyofLosAngelesDepartmentofParksandRecreation/Purklss-Rose-Rfil,November2000.

Construction equipment would emit nitrogen oxides, carbon monoxide, hydrocarbons, and particulates; ozone is not emitted directly but is a secondary pollutant produced in the atmosphere through a complex series of photochemical reactions involving reactive organic compounds (ROC) , and nitrogen oxides (NO)t). These emissions would increase local concentrations temporarily but would not be expected to increase the frequency of violations of air qualitystandards.

Construction workers' traffic and diesel powered equipment would emit nitrogen oxides, carbon monoxide, sulfur oxides, hydrocarbons, and particulates. These emissions would increase local concentrations temporarily but would not be expected to increase the frequency of violations of air quality standards. The daily emissions (assume the worst-case scenario of a full-day operation of construction equipment). as shown in Table 3, are estimated to remain below the threshold limits Plum Canyon County Park Project Final Initial Study/Mitigated Negative Dec:laration OIOtMPl.",c.,~,\"""~JIX (ji.al},J« Ofl:J.'O:10::S,{,If

Page 3 ends

I
I

3.0 Discussion of Environmental Impacts and MItigation Measures I
I
during the entire construction period. In addition, less than five pounds of PMIO would be emitted during the disturbance of approximately three acres of disturbed earth duringPhase I and four acres of disturbed earth during Phase II. As these quantities would not exceed any of the threshold limits presented in Table 2, significant air quality impacts resulting from construction activities are not anticipated tooccur. Mitigation measures would not be required.

OperationEmissions
I
I
I
The proposed project would generate new mobile source emissions associated with the vehicular trips generated by the park facility. No significant air emissions from stationary sources are anticipated (limited to the use of electricity on-site, which is anticipated to be minor). As discussed in Section XV, Transportation/Circulation, the proposed project is anticipated to generate less than 90 trips on any given day. Most of the visitors would be from the neighboring areas and would either walk or bike to the site. The proposed project would not result in significant traffic increases within the project vicinity. There would be no significant impacts to regional air quality anticipated from operation of theproposed project.

I
I
d) Expose sensitive receptors to substantial pollutant concentrations? I
I
I
Less Than Significant Impact. The project site is bordered by sensitive receptors, primarily single­ family residences, on the west, north, and south. However, as discussed above, the construction impacts associated with the proposed project would be less than significant, and because of their short duration, these impacts are not anticipated to add to long-term air pollution problems. Due to the low level of trips generated by the project, criteria pollutant concentrations are anticipated to be well below the thresholds and, therefore, would not result in a significant impact to sensitive receptors adjacent to the project site. No mitigation measures are necessary. e) Create objectionable odors affecting a substantial number of people? No Impact. No activities would occur and no materials or chemicals would be stored on-site that would have the potential to cause odor impacts during the construction and use of the proposed park facility. Therefore, adverse odor impacts w0':1ldnot occur. No mitigationmeasures arerequired.

I
I
IV. BIOLOGICAL RESOURCES
Would the project:

I
a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special-status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service?
c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? I
I
I
J Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration Ol/)I)JPI"", Ca.,'OIfNttJ« (/i."I) doc OI.l:W: 10·:$ ,I,ll

Page 3 ends

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures Less Than Significant Impact. Two biological reconnaissance surveys were conducted by an EDAW, Inc. (EDAW) biologist for the Plum Canyon County Park site on November 15,2000, and April 4, 2001; the latter was conducted to prepare response to comments. The reconnaissance surveys focused on determining the presence or potential for significant biological resources on or adjacent to the site. Vegetation communities and biological resources are documented inFigure 7.

Vegetation on site consists of disturbed coastal sage scrub dominated by deer weed (Lotus scoparius), with scattered individuals of California sagebrush (Artemisia californica), buckwheat (Eriogonumfasciculatumy; and black sage (Salvia mellifera). Native and nonnative plant species interspersed between the native shrub species in this habitat include horehound IMarrubium vulgare), pineapple weed (Chamomilla suaveolens), black mustard (Brassica nigra), red-stem filaree (ErodiulIl cicutariumi, Shepherd's purse (Capsella bursa-pastorisi, clover (Trifolium sp.), Russian thistle (Salsola iberica), goldfields (Last7zeniasp.), popcorn flower (PlagiobotTzryssp.), gazania (Gallzia sp.), pectocarya (Pectocarya sp.), cudweed (Gnaphaltum sp.), and tree tobacco (Nicotiana glaucds., Anarrowband of unvegetated land occurs along the western and southern boundaries of the project site, as mapped inFigure 1.

Due to the disturbed nature of the vegetation on site and the connectivity with housing developments to the north and west, the fauna observed within and adjacent to the project area were typically urban and disturbance-adapted species. Wi1dlife observed on site included western fence lizard (Sceloporus occidentalisy, common raven (Corvus corax), California towhee (Pipilo crissalls), mourning dove (ZenaiDa macroura), Anna's hummingbird (Calypte anna), Audubon's cottontail (Sylvilagus audubon;'), domestic dog (Canisjamiliaris), and small rodent burrows. "
Within the disturbed coastal sage scrub habitat, there are two narrow drainages that have been mapped as "CDFG-jurisdictional areas" due to the presence of a well-defined bed and bank associated with the drainages (i.e., a distinctly incised channel) and the presence of an "ordinary high water mark," which is defined, in part, as a "destruction of terrestrial vegetation" (e.g., the lack of vegetation within portions of the drainage that was observed during sitereconnaissance). Analysis of these drainages by the U.S. Army Corps of Engineers (Corps) determined that they did not fallwithin the Corps' regulatory jurisdiction; therefore, no federally protected wetlands would be affected by the proposed project. However, the California Department of Fish and Game (CDFG) conducted a separate field analysis and determined that it would take regulatory jurisdiction over the channels.

These drainages were typically bare; some areas at the bottom of the channel support non-native grasses. These two drainages merge to form a wider and more deeply cut "CDFG-jurisdictional" area. These drainages begin in the vicinity of the proposed tot lot and group picnic areas and extend to the south. Although the Corps has not taken regulatory jurisdiction on the proposed project, impacts to these drainages would require permits from CDFG and the California Regional Water Quality Control Board (RWQCB) (a 1601 Streambed Alteration Agreement and a 401 permit, respectively). Since these drainages total less than one tenth of an acre, impacts are anticipated to be less than significant but would require mitigation at a 1.5to 1ratio (1.5 acres of mitigation for each acre of impact) in order to comply with the "no net loss" policy of CDFG. The total area of impact associated with the CDFG-jurisdictional drainages on site is 0.046 acre; therefore, based on the 1.5:1 mitigation ratio, 0.069 acre of mitigation would be required. ' The disturbed coastal sage scrub habitat continues off-site along the relatively flat topography to the east. Within this adjacent off-site area is a sandy wash, which would qualify as another CDFG­ jurisdictional drainage, as shown in Figure 7. This wash is also associated with small patches of riparian vegetation in the form of mule fat scrub (Baccharis salicifolia). Sandy wash habitat within Plum Canyon County Park Project Final Initial Study/MItigated Negative Declaration Ol()f)$Pl.", Ci")'" "''tilt(' 1ji,.,I}"IIX OIl:W: 10..:1,,1.11

Page 3 ends

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
J

3.0 Discussion of Environmental Impacts and Mitigation Measures the region is suitable for the federal and state-listed endangered slender-homed spineflower (Dodecahema leptoceras). As currently designed, the proposed project would not impact the wash, and, therefore, no impacts would occur to any population of slender-homed spineflower or the riparian habitat within thedrainage.

One salt cedar iTamarixsp.) occurs off-site from the southeast end of the project area (Figure 7).

Intact coastal sage scrub occurs on the slopes to the east of the project site. California sagebrush is the dominant species in this area, with smaller pockets of white sage (Salvia apiana), scrub oak (Querclls berberidifoliai, and buckwheat. The California gnatcatcher (Polioptila californica californicai, a federally listed threatened species, was not observed during either site reconnaissance visit. However, based on input by the U.S. Fish and Wildlife Service (USFWS), focused surveys for the California gnatcatcher were recommended for the site and within all suitable vegetation within 300 feet of the proposed development. In response to USFWS recommendations, the County conducted focused surveys for the California gnatcatcher. No coastal.California gnatcatchers were observed or detected during any of the focused surveys. The absence of the gnatcatcher may be attributed to the isolated nature of the project site and the high level of urban development in the area.

The disturbed nature of the project site suggests that migratory bird species would not likely nest within the disturbed coastal sage scrub habitat on site. However, due to the low potential for bird species covered under the Migratory Bird Treaty Act to nest on site, the Los Angeles County Department of Park and Recreation would restrict all vegetation removal of suitable nesting habitat to the non-breeding season (generally September 1 through February 28). Nesting habitat for the majority of migratory bird species typically consists of native scrub species within the vicinity of the project site, such as California sagebrush, buckwheat, and white sage. Vegetation of at least one meter in height offers the optimal nesting habitat for most bird species. However, there are some ground-nesting species that can use shorter vegetation, such as small shrubs or tall grasses; as protective cover for theirnests. As previously stated, the disturbed coastal sage scrub habitat on site (i.e., sub-meter height) does not provide optimal nesting habitat for migratory bird species, particularly when highly suitable habitat occurs off-site to the east. The presence of this off-site optimal nesting habitat would likelyresult in the majority of the nesting activity to occur inthese off­ site areas rather than withintheproject Site.

The proposed project would have a less than significant impact on sensitive plant and animal species on site; as previously mentioned, no federally protected.wetlands would be affected by the proposed project. However, the following mitigation/avoidance measures would minimize impacts to the CDFG-jurisdictional drainages that would be eliminated from the project site and impacts to previously unidentified biological resources ifobserved during project construction.

Mitigation Measures
M-IV.l The County shall mitigate impacts tothe CDFG-jurisdictional drainages by contributing to a mitigationfund through the payment of aJee. The mitigationfund shall be used to 'mitigate off-site at an appropriate preserve selected by CDFG. TheJee shall be used to purchase 0.069acres ofmitigation at theselected preserve.

M-IV.2 Ifdisturbance of suitable nesting habitat occurs during the nesting season (February J5 throughAugust 31),a qualified biologist shall conduct ageneral bird survey within a 300- foot buffer from the limits oj grading no more than J5 days prior to the first ground Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0/004PI"",em"""Nt:g<I«!fllNrllrIC('{)/t:.I'O: /0 :.' .f.11

Page 3 ends

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures disturbance to determine ifnesting birds arepresent. Ifnesting birds are notfound during the survey 011site or within 300feet of the limits of grading, construction activities may proceed. During construction, similar surveys for nesting birds shall be conducted on a weekly basis on site and within a 300-[00t buffer from the limits of construction. !f a nesting bird listed as protected by the Migratory Bird Treaty Act is observed Oil site or withill300feet of the grading limits, all activity within 300feet of the nest shall be halted until it is certain that theyoung havefledged. This measure will ensure compliance with theMigratory Bird TreatyAct.
d) Interfere substantially with the movement of any native resident or migratory fish or wildlife corridors, or impede the use of native wildlife nursery sites? e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? .
1) Conflict wittI the provisions of an adopted Habitat Conservation Plan, Natural Conservation Community Plan, or other approved local, regional, or state habitat conservation plan? ' Less Than Significant Impact. The site is bordered by residential development to the north and west andby a major road (Plum Canyon Road) to the south. The site itself is relatively disturbed and doesnot provide optimal habitat forresident or migratory species in theregion. Impacts tomigratory birds would be minimized by restricting vegetation removal of suitable nesting habitat to the non­ breeding season (generally September 1 through February 28). The location of the project site adjacent to pre-existing development would not substantially interfere with the movement of any wildlife species through the area. Additionally, California's Natural Communities Conservation Plan (NCCP) docs not currently encompass this portion of Los Angeles County, and the County has not designated any portion of the site as part of a County-designated Significant Ecological Area (SEA).

Therefore, the proposed project would not conflict with any local, regional, or state preservation/conservation guidelines. No mitigation measures are necessary.

V. CULTURAL RESOURCES
Would the project:
a) Cause a substantial adverse change in the significance of a historical resource as defined in §15064.5?
b). Cause a substantial adverse change in the significance of a unique archaeological resource pursuant to §15064.5? .
c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
d) Disturb any human remains, including those interred outside offormal cemeteries? No Impact. EOAW archaeologists conducted an archaeological records search for the project site at the South Central Coastal Information Center. Six archaeological sites, one prehistoric and five historic, were identified within a one-mile radius of the project site. However, no archaeological sites havebeen previously recorded within theproject site boundaries.

Additionally, an archaeological survey was conducted for the project site. An intensive pedestrian survey was conducted on November 20, 2000, by EOAW staff archaeologists. An interval of no more than 15 meters was employed. Visibility was good to excellent. No cultural resources, including religious or sacred uses, were observed during the survey. Therefore, there isno potential Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0/008PI.,. (""RlonNff</rr ((1",,/).""" O/l:JIO:/0':$ .HI

I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures I
for impacts tocultural resources. No further archaeological work is recommended, and no mitigation measures are required. However, the following mitigation measure would minimize impacts to previously unidentified cultural resources if uncovered during project construction.

I
I
Mitigation Measure
M-V.l If previously unidentified cultural resources, including a potential feature or intact deposit, are exposed during ground disturbing construction activities, work shall be halted in that area, and the feature will need to be assessed for significance by a qualified archaeologist.

I
I
VI. GEOLOGY AND SOILS
Would the project:

I
a) Expose people or structures to potential substantial adverse effects, including the risk ofloss, injury, or death involving:
i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic-related ground failure, including liquefaction? iv) Landslides?
I
I Less Than Significant Impact. The project site is not located within the immediate vicinity of any major fault zones, including the most recent Alquist-Priolo Earthquake Fault Zone. The closest fault is the SanGabriel fault, which is located approximately 1.5miles southwestof the project site. Since earthquake-related hazards cannot be avoided in the Southern California region, the project site could be subjected to ground motion which could affect structures and/or park facilities. .The proposed park structures, such as the restroom/maintenance building, would be conducted in compliance with earthquake-resistant standards required by existing building codes (e.g.,Title 24 of the State Building Code). Habitable structures are not included in the proposed project, and all proposed structures would be constructed in compliance with uniform building codes. Therefore, the proposed project is not expected to increase the risk of exposure of people to impacts involvingfault rupture and seismic ground shaking.

I
I
I
I The California Department of Mines and Geology's Official Map of Seismic Hazard Zones for the Mint Canyon Quadrangle (which encompasses the project site) was released on March 25, 1999.2 Based on thereview of available USGS topographical maps, the project site is located within an area of liquefiable soils and earthquake-induced landslides. This could potentially affect areas on-site; however, prior to construction, existing building codes would be implemented to reduce the impact toa less thansignificant level. No mitigation measures are required.

I
I
I
I CaliforniaDepartmentofMinesandGeology,OfficialMap ofSeismic HazardZones/or theMint Canyon Quadrangle,March25,1999.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration OIOOJPI... C""'M Stf"«f/imllJ,,1« 01l:JIO: IO..:S,tit

Page 3 ends

I
I

3.0 Discussion of Environmental Impacts and Mltl2atlon Measures b) Result in substantial soil erosion or the loss of topsoil? I Less Than Significant Impact. The proposed project would not alter topography within theproject area. Minimal excavation would occur for the installation of the restroom/maintenance building.

Vegetation would be planted after construction; therefore, no significant erosion impacts are expected tooccur. No mitigation measures are required.I I
I
c) Be located on strata or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse?
I
.Less Than Significant Impact. No habitable structures would be developed as part of the proposed project; however, a small structure, a restroom/maintenance building, would be built in compliance with uniform building codes to ensure stable soils before construction. Therefore, no impacts from unstable soils are expected to occur. No mitigation measures arerequired.

I
d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code, creating substantial risks to life or property?
I
I
No Impact. The proposed project site consists of surficial soils, which are classified as non­ expansive soils. Therefore, there would be no impact due to expansive soils. No mitigation measures arerequired.
e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal ofwastewater? I No Impact. The proposed project would not involve the use of septic tanks to handle its wastewater generation. Therefore, no impacts are anticipated to result from project implementation. No mitigation measuresare required.

I
I
VII. HAZARDS
Would the project:

I
a) Create a significant hazard to the public or the environment through the routine transport, usc, or disposal of hazardous materials?
b) Create a significant hazard to the public or the environment through reasonably foreseeable upset· and accident conditions involving the release of hazardous materials into the environment?
c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?I I Less Than Significant Impact. The proposed project involves the construction of a public parkon a currently undeveloped open lot. There are small piles of debris across the site, which would be disposed of during the initial site clearing and grading phase of construction. The debris (primarily cementandmasonry rubble) and other excess materials at the site wouldnot pose a significant risk to the public as they would be hauled from the site and disposed of at a nearby landfill. As discussed below, no hazardous materials have been identified in the immediate vicinity of the site. Impacts regardinghazardous materials would not occur; therefore, no mitigation measures are required.

I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100..'PI.",0,.)".N<g<lrrIfi",tf) dO<"Ollnl(): IO::.c,Uf . Page3-11

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant . to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
No Impact. A review of the results of the hazardous materials/waste sites database search (performed to ASTM Standards) was conducted for the project site inNovember 2000.3 The results of the database search (provided in Appendix A) indicate that no hazardous material sites are known to occur within a one-mile radius of the project site. As such, no significant hazard to the public or the environment would be created as aresult of the project. No mitigation measures are required. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? 1) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area'? No Impact. The project site is located approximately ten miles northeast of Agua Dulce Airport, the nearest airport. Accordingly, the proposed project would not result in a safety hazard for people residing or working in the project area or visiting thepark. No mitigation measures are required. g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
Less Than Significant Impact. The proposed project would not interfere with a current emergency response plan or an emergency evacuation plan for local, state or federal agencies. Access to all local roads would be maintained during construction. Any emergency procedures would be implemented within local, state, and federal guidelines during construction and operation of the proposed project. Therefore, no significant impacts are anticipated. No mitigation measures are required.
h) Expose people 'or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands?
Less Than Significant Impact. Implementation of the proposed project would not expose people or structures to fire hazard from flammable brush, grass or trees. Standard safety procedures and best management practices would be employed during construction, minimizing the potential risk for accidents to occur, including fires. Also, on-site landscaping would be maintained and watered regularly so as to reduce fire hazard impacts. The barbecue facilities in the group picnic area would be located over 50 feet fromthe nearest undeveloped area to the east. Accordingly, the siting of the proposed park facilities would not pose a long-term fire hazard. No mitigation measures are required.
3 VISTAInformationSolutions,SiteAssessmentPlusReport/orPlumCanyonPark,November13.2000.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/()I)..tPI",. (,,,,,'0.Nrgtl« Ijl."')'.t« 011:JIO:10::$.111 Page3-t2

I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures VIII. HYDROLOGYANDWATERQUALITY
I Would the project:

I
I
a) Violate any water quality standards or waste discharge requirements? I
Less Than Significant Impact. The State Regional Water Quality Control Board (RWQCB) has adopted a General Construction Activity Storm WaterPermit for storm water discharges associated with any construction activity including clearing, grading, excavation reconstruction, and dredge and fill activities that"resultsin the disturbance of at least five acres of total land area. Construction of Plum Canyon County Park would disturb approximately seven acres of land area; therefore, a National Pollution Discharge Elimination System (NPDES) permit would be required for the project.

Compliance with the permit requirements would ensure that storm water runoff-related impacts would be less than significant; therefore, no mitigation measures arerequired.

I b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there should be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)?
I
I
I
Less Than Significant Impact. Construction of the tennis court, restroom/maintenance building, picnic shelter, walkways, basketball court, and parking lot would reduce the impervious surface area of the site by less than 0.25 acre. The remainder of the park would continue to allow subsurface infiltration through the grass lawns and landscaped areas. As such, the proposed project would not noticeably affect the local groundwater supply. No mitigation measures arerequired.

I
I
I
c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site?
d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? I
I
Less Than Significant Impact: As discussed in Section 1.0, only minimal grading would be required toprepare the project site for construction. Existing drainagepatterns would be maintained, andrunoff from thepark wouldbe directed to the local storm drain network. Runoff from theproject site would drain to one of two storm drains along the eastern boundary of the site or to the curbside storm drains along Via Joyce Drive or Plum Canyon Road. Minor improvements on existing surface drainage structure may be required in the northeast corner of the Phase I area to avoid drainage problems at the proposed tennis court site; however, such issues would not be significant and would be resolved during the detailed design phase of the project. No erosion, siltation, or flooding on- or off-site isanticipated tooccur. Therefore, no significant impacts areexpected to occur; no mitigation measures are required.I
I
I
~
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100$PI... Ca",'C)nNcy:</«Iji"III1Jo<-OI':.t'O:10':! !,If

Page 3 ends

I 3.0 Discussion of Environmental Impacts and Mitigation Measures I e) Create or contribute runoff water which would exceed the capacity of existing or planned storm water drainage systems?
l) Otherwise substantially degrade water quality?I
I
I
Less Than Significant Impact. A storm water drainage system is currently in-place at the project site. There are two storm drains along the eastern portion of the site and several curb-side drains along Via Joyce Drive to the west and Plum Canyon Road to the south. Two manhole access points are also located in the Phase II area. Drainage from the park would be routed to the existing storm drain network.

I
The existing storm drain system would adequately accommodate the proposed park improvements.

The amount of surface water runoff would not substantially increase beyond existing levels, as most irrigation water and precipitation would infiltrate into the lawn's root system and underlying groundwater table. No mitigation measures ~rerequired.

I .g) Place housing within a lOO-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? h) Place structures within a lOO-year flood hazard area which would impede or redirect flood flows?
i) Expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam? .

I
I
I
NoImpact. No housing is proposed for the project. In addition, theproject site is not located within an area designated as 1OO-yearor 500-year flood plain," Therefore, implementation of the proposed project would not subject people or structures to significant flooding impacts. No mitigation measures arerequired.

I
I
j) Inundation of seiche, tsunami, or mudflow?
I
No Impact. The project site is not located near a body of water; therefore, the potential for inundation by seiche, tsunami or mudflow is very low, if non-existent. Accordingly, implementation of the proposed project would not subject people or structures to inundation by seiche, tsunami, or mudflow. No mitigation measures are required.

IX. LAND USE AND PLANNING
I
I
Would the project:
a) Physically divide an established community?
I
NoImpaet. The construction of Plum Canyon Park would not divide the residential community or significantly impact low income or minority resources. The proposed project would develop approximately seven acres of an approximately 13-acre open lot. The lot is bordered by single­ family residences to the north, a scrub-covered hillside and utility corridor to the east, Plum Canyon Roadto thesouth,and residential streets tothewest. No mitigation measuresare required.

I
I ESRIlFEMA,Flood Hazard Map. hllp://mapserver2.esri.com/c ...Iha::ard.adol?s=0&cd=x&p=l&c= -118.490541. 34.448930&d=, November 14,2000.

I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration <)1003Plu",GIn)"o".v<r</~f/lN"'I.i«OI':J/o:11);:$,,1.11

Page 3 ends

I
I

3.0 Discussion of Environmental Impacts and MItigation Measures I
I
b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect?
I
I
I
No Impact. The project site is located in an unincorporated area of Los Angeles County.

Development in this area is governed by local and regional plans including the CountyofLosAngeles GeneralPlanand theSantaClaritaValleyAreaPlan. The general plan land use designation for the site is Urban I, which allows for low-density residential development (1.1to 3.3 units per acre). The site is zoned as Residential Planned Development (RPD). This land use designation and zoning classification allows for public park uses, such as the proposed Plum Canyon Park. As such, the proposed would not conflict with general plan or zoning designations. No mitigation measures are required. -
c) Conflict with any applicable habitat conservation plan or natural communities conservation plan?
I
I
No Impact. The California Department of Fish and Game's Natural Community Conservation Planning (NCCP) program incorporates an broad-based ecosystem approach to planning for the protection and perpetuation of biological diversity. There are no active NCCP areas in the vicinity of the project site. The nearest such NCCP area is located on the Palos Verdes Peninsula nearly 50 miles south of the project site. Also, there are no HCP planning areas in the immediate vicinity of the project site. Therefore, the proposed project would not conflict with any habitat conservation plans or natural communitiesconservation plans. No mitigation measures are required.

I x. MINERAL RESOURCES
I
I
Would the project:

I
a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b) Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan I
Less Than Significant Impact. Development of the proposed project would involve the use of. construction materials, which include non-renewable resources. However, the construction of the proposed project would follow industry standards and would not use non-renewable resources in a wasteful and inefficient manner. Additionally, the proposed project would not result in the loss of availability of any mineral resource that would be of future value; therefore, there is no potential for significant impacts onmineralresources. No mitigation measures arerequired.

I XI. NOISE
I Would the project:

I
I
a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels?
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 01003PI_ em•.\".Ntt.J« ljinill/.JIX1)/ :.1'fJ:10,:.<,HI

Page 3 ends

J

I
I

3.0 DiscussionofEnvironmentalImpactsandMitigationMeasures c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project?
d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the projectI
I Less than Significant With Mitigation Incorporation. The proposed construction ofPlumCanyon County Park would require various types of construction equipment, including some of thoselisted in Table 4. The County of LosAngeles Noise Code Section 12.08.440sets the maximum exteriornoise level for temporary intermittent construction noise at 75 dBA at any single-family residences between the hours of 7:00 a.m. and 8:00 p.m. (Monday through Saturday except Sundays and Holidays).

I
I TABLE "4

DEMOLITION AND CONSTRUCTION EQUIPMENT SOURCE NOISE LEVELS I
I
EquipmentType TypicalEquipmentat50ft.(indBAl QuietedEquipmentat50ft.(indBAl' ..

AirCompressor
Backhoe
ConcretePump
ConcreteVibrator
ConcreteBreaker
TruckCrane
Dozer
Generator
Loader
Paver
PneumaticTools
WaterPump
PowerHandSaw
Shovel
Trucks
81 85
82 76
82 88
87 78
84 88
85 76
78 82
88 71
80 80
70 75
80 83
71 80
80 75
71 70
80 83
I
I
I
I
Note: [fpiledriversareused,thenoiselevelsat50feetfortypicalequipmentandquietedequipmentwouldbe90dBA and80dBA,respectively.
a. Quietedequipmentcanbedesignedwithenclosures,mufflers,orothernoise-reducingfeatures.

SOURCE: Bolt,Beranek,andNewman,Noisefrom Construction Equipment and Operations. Building Equipment.and HomeAppliances. U.S.Environmental Protection Agency, 1971.

I Short-term construction impactswould be mitigated to acceptable levelsby measures specified in the Los Angeles Noise Code, Section 12.08.440 (C)(D) and the mitigation measures identified below.

These measures would be enforced by the Los Angeles County Sheriff's Department in response to complaints only.

I
I
The project site is located in an area primarily consisting of single-family residences, which are located immediately to the north, west, south, and northeast of the project site. These sensitive land uses would potentially be exposed to noise generated from on-site construction activities. The distance from the boundary of the proposed construction activities to the closest single-family residences located adjacent to theproject site is less than 50 feettothenorth and west.

I
I PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclaration0100JPI.",Cao,I'O.'·rg.I«(fl."I} J« 011:.110:IO::S"HI ,Page3-16

I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures I
I
Construction noise levels at and near the project site during project construction would fluctuate depending on the particular type, number, and duration of use of various pieces of construction equipment. Table 4 shows noise levels associated with various types of construction-related machinery. According to this table, noise levels as high as 88 dBA would be experienced by adjacent sensitive receptors. In the event when all of the equipment is operating simultaneously throughout the construction phase of the proposed project, the noise levels at the closest residence would be even higher. Construction noise would be temporary and intermittent and would occur only during daytime hours, which is the least noise-sensitive time of the day. Construction noise would have a short-term significant impact. However, with the implementation of the following mitigation measures, noise impacts would be reduced to less than significant levels given the limited hours and short duration of theconstruction activities.

I
I MitigationMeasures
I
I
M-XI.l Project construction shall comply with tlie County .of Los Angeles Noise Code.

Construction activities shall be limited to the hours of 7:00a.m. to 8:00p.m. onMondays­ Fridays; prior written approval shall be obtained to conduct construction activities on Saturdays between the hours of 7:00 a.m. and 8:00p.m. No construction shall occur on Sundays and legal holidays.

I M-XI.2 All construction equipment, stationary and mobile, shall be equipped with properly operating and maintained muffling devices.

I
I
I
I
I
M-XI.3 Temporary noise mufflers and noise attenuating devices, particularly along the northern boundary of theproject site adjacent 10the single-family residences, shall be employed to reduce noisegenerated during construction. (See Table4for anticipated noise reduction.) As discussed in Transportation/Circulation Section, no significant changes to traffic generation are anticipated to occur. Therefore, noise levels associated with traffic generation resulting from the operation of the proposed project is not expected to increase nor affect the ambient noise levels. No mitigation measures arerequired forpark operation.
e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two milesof a public airport of public use airport, would the project expose peopleresidingor working-intheproject area to excessivenoiselevels? 1) For a project within the vicinityof a private airstrip, wouldthe project exposepeopleresiding orworkingintheproject area toexcessivenoiselevels?
I
No Impact. The project site is not located within an airport land use plan, within two miles of a public airport or public use airport, or within the vicinity of a private airstrip. The proposed project would not expose people residing or working in the project area or people visiting the project site to excessivenoise levels fromairports or airstrips. No mitigation measuresarerequired. l
J
]
1 Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100$rlum.c("!ro~S<t<I«1l1."II.1tX'OIl:J.'O:10.:.1.1.11

Page 3 ends

I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures XII. POPULATION AND HOUSING
I
I
I
Would the project:
a) Induce substantial population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
I
I
No Impact. The proposed project would not induce substantial growth to the area since it is a response to the existing need for recreational facilities within the current residential area. No growth-inducing impacts are anticipated to result from the proposed project. No mitigation measures area necessary.
b) Displace substantial numbers of existing housing, necessitating the construction of replacement 'housing elsewhere? .
c) Displace substantial numbers of people necessitating the construction of replacement housing elsewhere?
I
I
I
No Impact. The project site is currently vacant and, therefore, would not involve removal of any land uses, particularly residential uses, from the project site. No existing housing or residents would be displaced fromthe project site. Therefore, no population and housing impacts are anticipated, XII1. PUBLIC SERVICES
Would the project:

I
I
I
I
a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services:

Fire protection?
I
I
I
Less Than Significant Impact. The County of Los Angeles Fire Department maintains its Division III Headquarters at 24875 N. San Fernando Road in Newhall, approximately six miles from the project site. This division handles two battalions and 15other stations; two of these other stations are located within approximately five miles of the project site.S Because the proposed local park is not anticipated to generate a significant fire hazard, the demand for fire protection services in the area is not expected to increase. The implementation of the project would be in accordance with the latest CountyFire Department codes and guidelines, including, but not limited to the following: _.,. • Specific fire and life safety requirements for the construction phase shall be addressed at the building fireplan check.
• Every building constructed shall be accessible to Fire Department apparatus by way of access roadways, with an all weather surface of not less than the prescribed width, unobstructed, clear- I
I
s LosAngelesCountyFireDepartment,DivisionMap,httptfire.co.la.ca/Divisionfdap.htm, November13,~OOO'~'''''" ~
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 011)1)$Plum("<1m"",N<'Y.'Irt'fj1."I),Je<>011:)10:10;:$,,01 (\

Page 3 ends

I
I

3.0 Discussion of Environmental Impacts and Mlti2ation Measures I
I
I
to-sky. The roadway shall be extended to within 150 feet of all portions of the exterior walls when measured by an unobstructed route around the exterior of thebuilding. • The maximum allowable grade shall not exceed 15percent, except where the topography makes it impractical to keep within such grade, and then an absolute maximum of 20 percent shall be allowed for up to 150 feet in distance. The average maximum allowed grade, including topography difficulties, shall be no more than 17 percent. Grade breaks shall not exceed 10 percent in 10feet.

I
• Fire flows up to 5,000 gallons per minute (gpm) at 20 pounds per square inch (psi) residual pressure forup to a five-hour duration mayberequired. Final fire flowswill be based on the size of the buildings, their relationship with other structures, property lines, and types of construction used. Fire hydrant spacing shall be 300 feetand shall meet the followingrequirements:

I
I
No portion of lot frontage shall be more than 200 feet via vehicular access from a public fire hydrant.

No portion of a building shall exceed 400 feet via vehicular access from a properly spaced public fire hydrant.

I • Turning radii shall not be less than 42 feet. This measurement shall be determined at the centerline of the road. A Fire Department-approved turning area shall be provided for all driveways exceeding ISOfeet in length and at the end of all cul-de-sacs, All on-site driveways shall provide a minimum unobstructed width of 26 feet, clear-to-sky. The on-site driveway shall be within 150feetof allportions of the exterior walls of any building.I I Landscape design and construction would also use low-fuel volume and drought tolerant species.

Therefore implementation of the proposed project would not negatively impact the ability of the County of Los Angeles Fire Department to provide adequate service. No mitigation measures are necessary.

I
I
I
Police protection?
I
Less Than Significant Impact. The County of Los Angeles Sheriffs Department maintains 21 main stations throughout the County. The closest facility to the project site is the Santa Clarita Valley Station located at 23740Magic Mountain Parkway in Valencia, approximately 4.5 miles from the project site." Public safety and vandalism reduction is an important consideration in the development of the designof the facility. Construction areas would be secured throughout the course of construction as necessary to ensure the safety of the public. The proposed local park is not anticipated to generate a significant demand for police protection services in the area because of its size and purpose of use. No mitigation measures are necessary.

I
I
I 6 LosAngelesCountySheriffsDepartment,Santa Clarita ValleyStation, http://www.lasd.org.stations/svc.htm.

November12,2000.

I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/OOJPl.", ('.1,(1'tJ" Sq./« ljin"/JJot:011.')10: /O:.'S,Uf Page3-19

I
I

3.0 Discussion of Environmental Impacts and MItigation Measures Schools?
I
I
No Impact. The proposed project would not have any growth-inducing effects. Most of the visitors of the proposed local park would be from the adjacent residential and neighboring areas; therefore, no impacts on school enrollment are expected. No mitigation measures arenecessary.

Parks?
I
I·
I
No Impact. The proposed project would serve theresidents in the project area and is not anticipated to generate any additional population and, therefore, would not increase demand for neighborhood or regional parks or other recreational facilities. The proposed project would have a beneficial effect on parks and recreational opportunities by providing the community with a local park. No negative impacts toparks are anticipated, and no mitigation measures arenecessary.

Other public facilities?
I
I
No Impact. The proposed project is not expected to significantly affect any other public facilities in the area or in the community or County as a whole. No impacts are anticipated. No mitigation measures are necessary.

XIV. RECREATION
Would the project:

I
I
I
I
a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
No Impact. The proposed project would not increase demand for neighborhood or regional parks.

Conversely, it would provide additional recreational opportunities by providing the community with a local park with a tennis court, children's play area, a multi-purpose field, and picnic areas. No negative impacts torecreation are anticipated. No mitigation measures arenecessary. b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? I No Impact. According to the County's A Parks and Recreation Strategic Plan/or 2010, the Santa Clarita Valley Regional Planning Area, which includes the project site, would have a deficiency of 233.7 acres of local parkland.' The proposed project would involve development of a local park to increase recreational opportunities'in the community. This would slightly alleviate the deficiency in recreation facilities inthearea. No mitigation measures are necessary.I I
J
J
7 CountyofLosAngelesDepartmentofParksandRecreation,AParksandRecreationStrategicPlan/or2010, May 1992.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 011)0.1PI,m,Cd'"onNcyd«1jI1I<1I),I/«OI':J.'O:10':.4_1.11

Page 3 ends

I
I

3.0 DiscussionofEnvironmentalImpactsand MitigationMeasures XV. TRANSPORTATION/CIRCULATION
I Would the project:

I
I
a) Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume-to-capacity ratio on roads, or congestion at intersections)? b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? I
Less Than Significant Impact. The project site is currently undeveloped and does not generate any vehicle trips. Accordingly, construction of the park would increase traffic on the surrounding residential streets and at local intersections. As described below, however, the increase inboth short­ and long-termtraffic levelswould beminor.

I Short-term construction impacts would be less than significant for this project. Construction workers would typically arrive at the project site in the morning and park their personal vehicles along Via Joyce Drive or on the project site. (Approximately 15 construction workers would arrive at and depart from the project site per day for the duration of Phase I and Phase II construction.) Construction equipment and supplies would be delivered to the project site at various stages of the construction process. No more than five delivery trips would be expected per day, largely because all heavy equipment would be staged on-site. Due to the limited number of vehicle and truck trips expected per day, construction activities would not alter normal traffic conditions around the project site.

I
I
I The proposed Plum Canyon County Park is a neighborhood park facility. As such, many of the park's visitors would arrive on foot or by alternative means of transportation (bicycle, etc.) from nearby residences. Some vehicular trips would be generated by the project, particularly during sporting events at the park, such as organized baseball or softball activities. Accordingly, the Institute of Transportation Engineers' (ITE) Trip Generation Manual (61h Edition) was used to determine trip generation rates for the proposed park facility. Conservative rates for "County Park" facilities were used todetermine maximum daily and peak hour trip estimates for the park, as shown inTable S.

I
I
I
I
TA~LE5

PLUM CANYON COUNTY PARK - TRIP GENERATION ESTIMATES
I
I
Element Parking Peak Hour Trip Daily Trip Generation
Spaces Generation
Weekday" Saturday" Weekday" Saturdayd
Phase I (3acres) IS 2 7 7 37
Phase II (4 acres) IS 3 9 10 49
BUILDOUT (7 acres) 30 5 16 17 86
a. TripGenerationRate=0.59tripsperacreofparkland;35%entering,65%exiting b. TripGenerationRate=2.24tripsperacreofparkland;59%entering.41%exiting c. TripGenerationRate=2.28tripsperacreofparkland;50%entering,50%exiting d. TripGenerationRate=12.14tripsperacreofparkland;50%entering,50%exiting :I~ ..Source. InstituteofTransportationEngmeers,TripGenerationManual(6 Edition),1997.I I PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclaration01()()JPl.",(""n",n NrgrltX(ji.,111dO('01;:),0:10,.:,.111 Page3-21
I

I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures I
Saturday is expected to be the busiest day at the park. As shown in the table below, approximately 16 vehicles would enter or exit the project site during the peak hour. On an average Saturday, approximately 86 vehicular trips would be expected over the course of the day. This incremental increase in traffic would not have a significant impact on local traffic intersections. Nearby intersections would continue to operate at acceptable levels of service during park operation as no significant increases in average delay times and volume-to­ capacityratios would be expected.

I
I
I
The proposed project would conform to the requirements of the County of Los Angeles Congestion Management Plan (CMP). The CMP requires that traffic studies be prepared to document impacts to all CMP monitoring intersections where the proposed project would add SOor more peak hour trips.

Because theproject would generate fewer than SOpeak hour trips and there are no CMP intersections inthe vicinity ofthe site, impacts to CMP monitori~g stations arenot anticipated.

As described above, impacts to the local street system would be less than significant; therefore, no mitigation measures are required.

I
I c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? I No Impact. The proposed project would not generate air traffic nor affect such activities. No mitigation measures are required.

I
I
"I
d) Substantially increase hazards to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? No Impact. The proposed project and the parking lot would meet all applicable design and safety requirements; therefore, no hazards associated with a design feature would occur. No mitigation measuresare required.
e) Result in inadequate emergency access?
I No Impact. No changes in access to emergency facilities or nearby land uses are expected to occur as aresult of implementation of theproject, No mitigation measures arerequired.

I 1) Result in inadequate parking capacity?
I
Less Than Significant Impact. A total of 15parking spaces would be provided under eachphase of park construction (for a total of 30 parking spaces at project buildout). As shown in Table 5, peak hour trip generation would not exceed the available parking supply. In the event that additional parking is needed, street parking would be available along Via Joyce Drive. Impacts related to parking supplywould be less'thansignificant; therefore, no mitigation measures are required.

I
I
~
g) Conflict with adopted policies supporting alternative transportation (e.g., bus turnouts, bicycle racks)?
No Impact. The proposed project would not conflict with adopted policies supporting alternative transportation. As discussed above, many park users would arrive on foot or by other non-vehicular" Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration I)IIXMPI.", ("'In)on St'l'ltX lji'I(II)..I« 1)1-:],0: 11).:.cI,ll

Page 3 ends

J

I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures I
means of transportation. To accommodate bicycle riders, bicycle racks would be provided at the park. No mitigation measures are required.

XVI. UTILITIES AND SERVICE SYSTEMS ~~ ~ ,-- ·---·~~' __ .- c • I
I
Would the project:

I
I
a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board?
b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects?
I
Less Than Significant Impact, The proposed project isnot anticipated togenerate a significant amount ofwastewater as the only use on-site that would generate wastewaterwould be therestroom building. Similarly, water usage would also be minimal. No new wastewaterand water systems would be required. Therefore, impacts towastewater treatment andwatertreatment would be less than significant. No mitigation measures arenecessary.

I
I
c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? I
I
Less Than Significant Impact. The proposed project isnot expectedto substantially increase storm water runoff in theproject area. Major portions of the project site wouldremain impervious; a limitednumber ofproject components would require paving or impervioussurfaces, such asthe tennis court,thebasketball court, the parking lots, and walkways. Thedevelopment of theproposed project isnot anticipated to significantly changethe amount of impervioussurfaces on-site to increase surface water runoff. Therefore, this would be a less than significantimpact. No mitigation measures arenecessary.

I
d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed?
e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commltmentsj
I Less Than Significant Impact. The proposed project is not anticipated to use a significant amount of water as the only uses on-site that would use water would be therestroombuilding and landscaped areas and the multi-purpose field, which would both require irrigation. Similarly, wastewater generation would also be minimal as the only use on-site that would generate wastewater would be the restroombuilding. No new wastewater and water systems wouldbe required. Therefore, impacts to wastewater treatment and water treatment would be less than significant. No mitigation measures are necessary.

I
I
I
f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs?
g) Comply with federal, state, and local statutes and regulations related to solid waste? Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 010011PI",.('".W,.,,\'<t<I~tfl."I).I1X'OIl:J:O:10:';$,1.11

Page 3 ends

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

3.0 Discussion of Environmental Impacts and Mitigation Measures Less Than Significant Impact. The proposed project would not require new solid waste facilities.

Construction debris would be recycled or transported to the nearest landfill sites and disposed of appropriately. The nearest landfill is the Chiquita Canyon Landfill located at 29201 Henry Mayo Drive in Castaic, approximately 15miles from the project site; other landfills sites within 30 miles of the project site are Bradley West Landfill (approximately 2S miles away), Sunshine Canyon Landfill (approximately 26 miles away), and Antelope Valley Landfill (approximately 30 miles away)." The amount of debris generated during project construction and operation is not expected to significantly impact landfill capacities; solid waste generation by the new local park would be minimal. The proposed project would comply with applicable regulations related to solid waste Operation of the proposed project would be subject to the requirements set forth in the County's Solid Waste Management Program. Although no significant impacts to solid waste facilities are anticipated, the following measures would further ensure solid waste minimization during project construction and operation.

Mitigation Measures
M-XVI.l Prior to completion of plans and specifications, the County of Los Angeles Department of Parks and Recreation shall include in thefinal plans and specifications the requirementfor the construction COiltractor to work with the County ofLos Angeles Department ofParks and Recreation's recycling coordinator, Mr. Boyd Horan, to ensure that source reduction­ techniques, procurement of recycled building materials, and tile development of recycling programs during construction and operation of thefacility are considered and implemented whenever possible. The County of Los Angeles Department of Parks and Recreation's recycling coordinator shall review the plans and specifications for incorporation of the" 'I ~ specified language. The County of Los Angeles Department ofParks and Recreation shall demonstrate tothesatisfaction of the County ofLos Angeles Department of Public Worksthe incorporation ofthis requirement.

M-XVI.2 Prior to completion of plans and specifications, the County of Los Angeles Department of Parks and Recreation shall clearly identify bin enclosures and recycling containers, in accordance with the California Solid Waste Reuse and Recycle Access Act of 1991, as amended. The County of Los Angeles Department of Parks and Recreation shall demonstrate to thesatisfaction of the County ofLos Angeles Department of Public works the incorporation ofthis requirement. '
XVII. MANDATORY FINDINGS OF SIGNIFICANCE
a) Does the project have the potential to degrade 'the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory?
Less Than Significant Impact. The analysis conducted in this Initial StudylMitigated Negative Declaration results ina determination that the project, either individually or cumulatively, would not have a significant effect on the local environment. The project site hasbeen previously disturbed and is devoid of fish or significant wildlife, andlor plant populations. The proposed project would not SanitationDistrictsofLosAngelesCounty,Landfills/Other Facilities, hllp://wwwllacsd.org/swasle/othr l(s. 111m,November14,2000.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 01(I(JJPI"", C""'O' .\'<gd« (/lnal/.d« 01 :J(I:If) :,fIII Page3-Z4

I
I

3.0 Discussion ofEnvironmental Impacts and Mitigation Measures I
I
have thepotential todegrade theenvironment in this regard as it wouldsimply develop a site thathas been previously disturbed. No intrusion on cultural resources is anticipated to occur. b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.) I
I
Less Than Significant Impact. The analysis in this Initial Study/Mitigated Negative Declaration has determined that theproject would not have any cumulatively considerable impacts. c} Does the project have environmental effects, which will cause substantial adverse effects on human beings, either directly or indirectly?
I I, ~
Less Than Significant Impact. As indicated in the discussions of the Initial StudylMitigated Negative Declaration, the proposed project would not cause substantial adverse effects on human beings, either directly or indirectly.

I
I
I
I
I
I
I
I
I
~
J Plum Canyon County Park Project final Initial Study/Mitigated Negative Declaration I'J'M~~l)fllM ~'''\\? ..•"rgcl« ((llft,l) '/('(' nl :' '(): If) :, ,ut

Page 3 ends

]

I
I

4.0 List of Preparers

4.0 LIST OFPREPARERS
I
I
REPORT AUTHO~S

LOSANGELESCOUNTY

DEPARTMENTOFPARKSANDRECREATION
LarryHensley,-hftndscapeAtCIIi1eC~tei~,r?~;b~;rLillieLowery•.parkPlannerf). ~ ~/ ll..ttu/(/:I!JL¢Ac.aI-,. LucyYounger,ProjectManagerI I
1 CONSULTANT
EDAW~INC.
1 I
MichaelSchwerin,ProjectDirector
MadonnaMarcelo,ProjectManager
EricWilson,SeniorEnvironmentalAnalyst.

ElizabethCandela,EnvironmentalAnalyst
LyndonQuon,SeniorWildlifeBiologist
ErikLaCoste,WildlifeBiologist
JamesPrine,SeniorRestorationEcologist
CherylBowden-Renna,Archaeologist
JenniferDellert,Archaeologist
·1
I
I
1 1
1 I
1 1
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100JPlumG,.yOJlN<rd«(ji.lI/J.J« O/l:JlO:10::$A.II •

Page 4 ends

I 5.0 PersonS/Agencies Contacted and References
I 5.0 PERSONS/AGENCIES CONTACTED

AND REFERENCES
I
I
I

PERSONS/AGENCIES CONTACTED
Castanon, David J., Chief, North Coast Section, Regulatory Branch, Department of the Army, Los Angeles District, Corps of Engineers, January 30,2001
Courtney, Betty, California Department ofFish and Game, March 30,2001 and October 22,2001 I
I
Farris, Rick, Senior Ecologist, U.S. Fish and Wildlife Service, April 2001, October 24, 2001, and November 1,2001
Fitzgerald, Ellen, Los Angeles CountyDepartment ofRegional Planning, November 15,2000 I Harris, Scott,Associate Wildlife Biologist, California Department ofFish and Game, March 21,2001 Klecha, Anthony, Los Angeles Regional Water Quality Control Board, February 2001 I Lampara, Louise, Wildlife Biologist,U.S. Fish and Wildlife Service, April 2001 I
I
Lang, Steven N., Purkiss-Rose-RSl, Landscape Architecture, Recreation and Park Planning, November 2000

REFERENCES
I
Bolt, Beranek, and Newman
1971 Noise from Construction Equipment and Operations, Building Equipment, and Home Appliances, U.S.Environmental Protection Agency.

I
I
I
California Air Resources Board
1998 URBEMIS7G (Version 3.1). August.

California Department of Mines andGeology
1999 OfficialMap ofSeismicHazard Zones/or theMint Canyon Quadrangle. March 25.

County of Los Angeles Departmentof Parks and Recreation 1999 Facility Program, Plum Canyon CountyPark. July.
1992 A Parks andRecreation Strategic Plan/or 2010. May.

I County of Los Angeles Department ofRegional Planning
1990 Santa Clarita ValleyArea Plan: A Component of the County of Los Angeles General Plan. December 6.

I ESRIlFEMA
2000 Flood Hazard Map, http://mapserver2.esri.com/c ...Ihazard.adol?s=0&cd=x&p=1&c= -118.490541, 34.448930&d=. November 14.

I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/IX»PI.",C,m,\'011N<gJ«fjln<l/)dO('0/1:1,0:/O..:S.ut

Page 5 ends

I

Plum Canyon County Park Project Final Initial.Study/Mitigated Negative Declaration (//()()$P"""C.m"'~\.'<:<I."("lfi~,,/Jd()('O/,:J.,O:I()·' 11/

Page 5 ends

I 5.0 Persons/Agencies Contacted and References
I
I
InstituteofTransportationEngineers
1997 Trip Generation Manual (6thEdition).

I
I
LosAngelesCountyFireDepartment
2000 Division Map, http://re.co.la.calDivision_Map./lIm. November13.

LosAngelesCountySheriffs Department
2000 Santa Clarita ValleyStation, http://www.lasd.org.stations/svc.lztm. November12.

SanitationDistrictsofLosAngelesCounty .
2000 Landfills/Other Facilities, http://wwwllacsd.orglswaste/othrlfs.htm.November14.

I
I
SouthCoastAirQualityManagementDistrict
1993 CEQAA,irQuality Handbook. April..

VISTAInformationSolutions
2000 SiteAssessment Plus Report/or Plum Canyon Park. November13.

I
I
I
I
I
I
I
I
I
I
I
I

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I SECTION 6.0 COMMENTS RECEIVED

ON THE DRAFT INITIAL STUDY/

MITIGATED NEGATIVE DECLARATION

AND RESPONSES
I
I
I
A total of nine comment letters were received by the County of Los Angeles Department of Parks and Recreation in response to the agency/public circulation of the Draft Initial StudylMitigated Negative Declaration (ISIMND) for the Plum Canyon County Park Project. The written responses to the comments onthe Draft ISIMNDare presented in this section. Responses to the comments are provided in the text that follows each letter.

I Commentor
I A State of California Governor's Office of Planning andResearch State Clearinghouse
I B County Sanitation Districts of Los Angeles County
Planning and PropertyManagement Section
Ruth I.Frazen, Engineering Technician
I
I
I
C Southern California Association of Governments
Intergovernmental Review
Jeffrey M. Smith,AICP, Senior Planner
D County of LosAngeles Fire Department
Forestry Division
David R. Leininger,Acting Chief, Prevention Bureau
I
I
E State of California Department ofFish and Game
Scott Harris, Associate Wildlife Biologist
G
City of Santa Clarita
Tom Reilly, ParkDevelopment Administrator
State of California Governor's Office of Planning andResearch State Clearinghouse
Terry Roberts, Senior Planner
F
I
I H Los Angeles CountyDepartment ofPublic Works
Watershed ManagementDivision
Rod H.Kobomoto,Assistant Deputy Director
I California Regional Water Quality Control Board (LosAngeles Region) TMDL Unit
Elizabeth Erickson,Associate Geologist
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/()I)JPI.,. C<ln,I'On iV<'C<Jrt'IJIm'/),cJ«OJ:_I'II:/0":$ ,~,\(

Page 6 ends

J

I 6,0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I
I

LETIERA
STATE OF CALI FORNll\
I
I
Governor's OfficeofPlanning and Research
State Clearinghouse
GrayDavis
CO\'ERSOR.

SteveNissen
DJI(CTOl

ACKNOWLEDGEMENT OF RECEIPT
DATE: February22.2001
LarryHensley
LosAngelesCounty
433 SouthYennontAvenue
LosAngeles,CA90020
I
I
TO:

RE: PlumCanyonCountyParkDevelopment
SCH#:2001021050
I nUs istoacknowledgethattheStateClearinghousehas receivedyourenvironmentaldocument forstatereview.ThereviewperiodassignedbytheStateClearinghouseis:

I ReviewStartDate:

ReviewEndDate:

February13.2001
March 14,2001
A-I
I WehavedistributedyourdocumenttothefoJJowingagenciesanddepartments:

I
I
I
Caltrans,District7
DepartmentofConservation
DepartmentofFish andGame,Region5
DepartmentofForestryandFireProtection
DepartmentofHealthServices
DepartmentofParksandRecreation
NativeAmericanHeritageCommission
RegionalWaterQualityControlBoard, Region4
ResourcesAgency
StateLandsCommission .

StateWaterResourcesControlBoard, CleanWaterProgram
I TheStateClearinghousewillprovideaclosingletterwithanystateagencycommentsto your attentiononthedatefoJJowingthecloseofthereviewperiod,
ThankyouforyourparticipationintheStateClearinghousereviewprocess.

I
I
I
I
10400rsxru STREET zo,BOX}O+f S.\Cl.,\:l.II::"TO. C,\UFOl:-<I,\ 9JSll-JO.f-l 916·-HS~I} FAX916-m-1018 ",""".orR.C,\,CO\' ClEAll~CIIOUS".ltniL I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 011)()JPI"", (',,"yon Ntgd~ I/iIHd),Jot 011:)10: 10,:$ ,Ut

Page 6 ends

I 6.0 Comments Received on the Draft Initial StudylMitigated Negative Declaration and Responses I Letter A: Response to Comments fromthe State of California Governor's Office ofPlanning and Research
State ClearinghouseI
I Comment
Number Response
I
I
A-I According to the State Clearinghouse, the Draft Initial StudylMitigated Negative Declaration was distributed to 11agencies and departments during the comment period.

Only one agency, Department of Fish and 'Game, commented during this period (see Letter E).

A-2 Please see response toLetter G.

I < •
I
I
I
I
I
I
I
I
I
I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration ")/00$ PlUMC".,'MNtgJ« 1/1",11),<1«01:' 0: 10,':$"U/

Page 6 ends

I 6.0 CommentsReceivedontheDraftInitialStudy/MitigatedNegativeDeclarationandResponses I

COUNTY SANITATION DISTRICTS

OF LOS ANGELES COUNTY
I

LETTERB
I 1955 Wor~monMillRood,Whittier,CA90601.1.:100
MailingAddress:P.O.Box.:1998,Whittier,CA90607-.:1998
Telephone:(5621699.7.:111,fAX:(5621699.5.:122
www.lOCsd.Olg
JAMESF.STAHL
ChiefEngineeranc/GeneralManager
I Febn,uuy28,2001
FileNo: 26-00.04-00
I
I o Mr.LarryR.Hensley,DepartmentFacilityPlannern .'
COUllt}·ofLosAngelesDepartmentof'ParksandRecreation
433SouthVermontAvenue
LosAngeles,CA90020

RECEIVED
f·1AR0t 2001
PLANNINGOIVlS'("'"
DearMr.Hensley:

I
PlumCanyonCountyPark Development
TheCountySanitationDistrictsofLosAngelesCounty(Districts)receivedanInitialStudyandDraft MitigatedNegativeDeclarationforthesubjectprojectonFebruary12,2001. Weofferthe following commentsregardingsewerageservice:

I Thearea in questionis outsidethejurisdictionalboundariesof theDistrictsand willrequire annexationinto DistrictNo. 26 beforesewerageservicecan be providedto the proposed development.Forspecificinfonnationregardingtheannexationprocedureandfees,pleasecontact Ms.MargaritaCabreraatextension2708.

I 2. Thewastewaterfloworiginatingfromtheproposedprojectwilldischargeto a localsewerline, whichisnotmaintainedbytheDistricts,forconveyancetotheDistricts'BouquetCanyonRelief TrunkSewer,locatedinBouquetCanyonRoadatFestividadDrive.This24-inchdiametertrunk sewerhasadesigncapacityof12.3milliongallonsper day(mgd)andconveyedapeakflowof6.9 mgdwhenlastmeasuredin 1996.I
I 3. TheDistrictsoperatetwowaterreclamationplants(WRPs),theSaugusWRPandtheValenciaWRP in orderto providewastewatertreatmentin the Santa ClaritaValley. These facilitiesare interconnectedto forma regionaltreatmentsystemknownas the SantaClaritaValleyJoint SewerageSystem(SCVISS)whichhasapermittedtreatmentcapacityof19.1mgd. Atwophase expansionoftheValenciaWRPhasbeencurrentlyapprovedwhichwillincreasethetreatment capacityoftheSCVJSSby ISmgd.Thefirstphase,scheduledtobecompletedbyearly2002,will consistofa9.0mgdexpansionandisexpectedtomeettheRegionalGrowthManagementPlan forecasteddemandthrough2010.Thesecondphase,scheduledtobecompletedbyearly2010,will consistofanadditional6.0mgdexpansionandwillincreasetheSCVISStreatmentcapacityto

34.1mgdwhichwillbesufficienttomeetthedemanduntil20lS. TheSCVISScurrentlyprocesses anaverageflowof16.6mgd.

I
I
I 4 Theexpectedaveragewastewaterflowfromtheprojectsiteis1,3S7gallonsper day.

I
I
B-1
B-2
B-3
-------------~~-~---------------------------PIUDlCanyonCountyPark ProjectFinnlInitialStudy/MItigatedNegativeDec:laration~)/()()"p"~,,,C"f/ln'()l1 ~Vt'gllfC'ljiml/).(J« OIl:J '0:I":C ~~, Page6-4

I 6.0 CommentsReceivedontheDraftInitialStudy/MItigatedNegativeDeclarationandResponses I
I
I
I
I
I
I
I
I
I
I
I
I
I
1 I.

I
Mr.LarryR.Hensley 'February28,20012
s. TheDistrictsareempoweredbytheCaliforniaHealthandSafetyCodeto chargea feeforthe privilegeofconnecting(directlyorindirectly)totheDistricts'SewerageSystemor'Increasingthe existingstrengthandlorquantityofwastewaterattributable toaparticular parceloroperation already connected. Thisconnectionfeeisrequiredtoconstructanincrementalexpansionofthe SewerageSystemtoaccommodatetheproposedprojectwhichwillmitigatetheimpactofthisproject B-4 onthepresentSewerageSystem.Paymentofa connectionfeewillberequiredbeforeapermitto connecttothesewerisissued. Forspecificinformationregardingtheconnectionfeeapplication procedureandfees,pleasecontacttheConnectionFeeCounteratextension2727.

6. InorderfortheDistrictstoconformwiththerequirementsoftheFederalCleanAirAct(CAA),the designcapacitiesoftheDistricts'wastewatertreatmentfacilitiesarebasedontheregionalgrowth forecastadoptedbytheSouthernCaiiforniaAssociationorGovernments(SCAG).Specificpolicies includedinthedevelopmentoftheSCAGregionalgrowthforecastareincorporatedintotheAir QualityManagementPlan,whichispreparedbytheSouthCoastAirQualityManagementDistrict in orderto improveair qualityin the SouthCoastAir Basinas mandatedby theCAA. All expansionsof Districts'facilitiesmustbe sizedand servicephasedin a mannerwhichwillbe B-5 consistentwiththe SCAGregionalgrowthforecastfor the countiesof LosAngeles,Orange, SanBernardino,Riverside,Ventura,andImperial.TheavailablecapacityoftheDistricts'treatment facilitieswill,therefore,be limitedto levelsassociatedwiththeapprovedgrowthidentifiedby SCAG.Assuch,thisletterdoesnotconstituteaguaranteeofwastewaterservice,butistoadvise youthattheDistrictsintendtoprovidethisserviceuptothelevelswhicharelegallypermittedand to infonnyouof thecurrentlyexistingcapacityand anyproposedexpansionof the Districts' facilities. '
Ifyouhaveanyquestions,pleasecontacttheundersignedat(562)699·7411,extension2717.

Verytrulyyours,
JamesF.Stahl
~J.j'N-~RuthI.Frazen
EngineeringTechnician
Planning& PropertyManagementSection
RIF:eg
Page6·5
I PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclaration01003 Plum (~"f\'f)'" \'~\.,,('(' tfimr/J.10(' O/!!JIO: 10.:1.~,\1

I 6.0 Comments Received on the Draft Initial StudylMltigated Negative Declaration and Responses I
I
Letter B: Response to Comments fromthe County Sanitation Districts of Los Angeles County Planning and Property Management Section
Ruth I.Frazen, EngineeringTechnician
I
I
Comment
Number Response
B-1 The project site will be annexed into District No. 26 to receive sewerage service. Ms.

Margarita Cabrera, Engineering Technician for the Planning and Property Management Section of the County Sanitation Districts of Los Angeles County, was contacted regarding annexation of the site into District No. 26. According to Ms. Cabrera, based on an estimated park area of 12.92 acres, the annexation processing fees total - approximately $7,378; this application for sewer connection will be processed after an approved annexation application, which would include a copy of this CEQA document (after certification), is submitted to the Local Agency Formation Commission I
I B-2 The proposed project will discharge to a local sewer line for conveyance to the Districts' Bouquet Canyon Relief Trunk Sewer, which is located approximately eight miles southwest of theproject site.I
I
I
B-3 The two water reclamation plans providing wastewater treatment in the Santa Clarita Valley are not anticipated to be impacted by the proposed project since the proposed project is expected to generate an average wastewater flow of 1,357gallons per day. In 2002, the Santa Clarita Valley Joint Sewerage System (SCVJSS) will have an expanded treatment capacity of 28.1 million gallons per day (mgd). Currently, SCVJSS processes an average flow of 16.6 mgd. The project addition of 0.0014 mgd would be a small fraction of the treatment capacity that it is expected to have a less than significant impact on the two water reclamation plans inthe area.

I B-4 The County will be subject to pay any applicable utility connection fees to the appropriate service providers.

I
I
B-5 The proposed project has been identified and included in the County's A Parks and Recreation Strategic Plan for 2010, which was prepared in 1992 consistent with the Conservation and Open Space Element of the 1980 County General Plan. Therefore, it may be assumed that the regional growth forecast adopted by the Southern California Association of Governments includes the proposed project. Accordingly, it may be assumed the proposed project would generate wastewater flow within the level that is legally permitted toconform with the requirements of theFederal Clean Air Act.

I
I
I
I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/QOJP/u.. c.,.w,"\'~/rt'((i",,/)JIX OII~JIO~/O:~.'1.\/

Page 6 ends

I

LETIERC

6.0 CommentsReceivedontheDraftInitialStudy/MitigatedNegativeDeclarationandResponses I
I ,OUTHERNCALIfORNIA
I
><ASSOCIATION erGOVERNMENTS
I
I MllnOfflc,
81SWul Stvtnth Str«t
ulhftoor
los ~s. ~UlOtI\Ia
pooI7')4lSI
I
I
-~-.-- .......oe.t ....",.."...· ............_..._..,_. -...... - -............ s... _
........ 0-.- .............. "-.__ .c-
...,....'-<---Il0l,,....0.. .... _ _
_.--- ...............................~.c.,. .......... tw_""..... ---.-­_. &.0 cw.a.1IoI"....._
-.-.,.- ...._.-.,.._.........__...__ •__ 100 •...
~ "__ Il0l •__ 100
..............................,...~_,.,.....- ...:r:...::.::t:~~".... -~.---_ _ ...Hc""•.............................__ ._ c...,..."""...-. _--....,_ _.JOol_Ioo......_ ,....................._ -.._-~--"'"'"".....-.Ioo-·I100¥1.....__................................,._,.,._0.. ....... .,...,. ..- ......-__.._._,,_,__ -........'-<..._-_..............._._--a.,·_-.t_· _ ...........,..,..-- ....... __ ,._.,.. 100--.. Coo __ a-o, -._..
~ --....foMooooo._."' _
...............,...,a......,...-....
""--__ Mr ...... _c-.·_"'_·000_......., --__,.._...­J.-s.-_ -~.......,_._,­..._-......,
I
I
I
I
I
I
March12,200J
Mr.LarryHensley
DepartmentalFacilitiesPlannerJ
LosAngelesC.ountyDepartmentofParksandRecreation
433S.VermontAvenue
LosAngele"CA90020
RE: SCAG Clenringhousc120010116Plum Canyon County Park
Development
DearMr.Ilensley:

Wehavereviewedtheabovereferenceddocumentanddeterminedthatitis notregionallysignificantperAreawideClearinghouseaitc:ria.Therefore,the projectdocsnotwarrant clearinghousecommentaatthistime. Shouldthere C-l beachangeinthescopeofthc project.wewouldappreciatetheopportunityto reviewandcommentatthattime.

AdescriptionoftheprojectwillbepublishedintheMarcb 15,200J lntergovernmcntaJReviewReportforpublicreviewandcomment.

TheprojecttitleandSCAGClearinghowenumber~houldbeusedinall correspondencewithSCAGconcerningthisproject.Correspondenceshould besenttotheattentionofthc:ClearinghouseCoordinator.Ifyouhaveany questions,pleasecontactmeat(213)230.1867.

Sincerely. /]10'L
C1tt('7~'7Itrl/fllf( ~
UE~~Jl.SMnH,Ale?
SeniorPlanner
IntergovernmentalReview
PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclaration 010IMPI.,. c,••)""Nq(tl« (ji",.II.Joc 01l:J/0:10::$.IM
Page6-7

I 6.0 Comments Received on the Draft Inltlal Study/Mitigated Negative Declaration and Responses I LetterC: ResponsetoCommentsfromSouthernCaliforniaAssociationofGovernments IntergovernmentalReview
JeffreyM.Smith,AICP,SeniorPlannerI
I
I
I
Comment
Number Response
C-I AccordingtotheSouthernCaliforniaAssociationofGovernments(SCAG),theproposed projectwouldnotberegionallysignificantperAreawideClearinghousecriteriaanddoes notwarrantclearinghousecommentsatthistime.

I
I
I
I
I
I
I
I
I
I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negatlve'Deelaratlon 01003PlumCl''',\'O", N~gr.ltctfl,,,'/~,AJt.~I':?n:10:':.'..1.\/

Page 6 ends

I

I
LANDDEVELOPMENTUNIT- GENERALREQUIREMENTS:

ThispropertyislocatedwithintheareadescribedbytheForestctandFireWardenasaFireZone4.VeryHigh Fire HazardSeverityZone(VHFHSZ). AllapplicablefirecodeandordinancercquircmenIsforconstruction, access.watermains,firehydrants,fireflows.brushcl~ andfuelmodificatJonplans.must bemet.

Specificfue andlifesafetyrequirementsfor theconstntctionplwe will beaddressedat thebuildingfire plan check. Theremaybe'ad<fitionalfireandlifesafety requ!m::erus:mringthistime.

Everybuildingconstructedshallbe acces3ibleto FltcDepartmentapparatusby wayof accessroadways,with anall weathersurfaceofnot lessthantheprescribedwidth,unobstructed,clear.to-slcy.Theroadwayshallbe extendedtowithinISOfeetofallponionsoftheexteriorwaJlJwhenmeasuredbyanunobstructedroute around theexteriorofthebuilding.
0-1
I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I
I
LE1TERO

COUNTY OF LOS ANGELES

FJRE DEPARTMENT
1m NORTHI!ASTtIIHII(DM
lO5 AHOIUS. CALJFOIWC4_»t4
I (323)8904330
I
P. MICHAELFREEMAN

FIRECHIEF

FORESTER&FIREWARDEN
March8,2001

RECEIVED
MAR\ 2 iMl
pLAN~INGDIVISI.C1
.I
I
'Larry R.Hensley.DepartmentFacilityPlannerII .

CountyofLosAngelesDepamnentof Parb andRecreation
433SouthVermontAvenue. .

LosAngeles,CA90020
I DearMr.Hensley:

I
SUBJECT: ENVIRONMENTALIMPACTREPORT-NOTICE OF INTENTTO ADOPTA MITIGATEDNEGATIVEDECLARATIONFORTHE PLUMCANYONCOUNT\'
PARKDEVELOPMENT,"CITY OFSANTACLARITA" - (Em 1108212001) I
TheNoticeof Intenttoadopta MitigatedNegativeDeclarationforthePlumCanyonCountyParkDevelopment basbeen reviewedbythePlanning.LandDevelopment.andForestryDivisionsof theCountyof LosAngeles FireDepartment.The followingarctheircomments:

I
I
I Whena bridgeis required,to be usedas part of. fireaccessroad. it shallbe constructedandmaintainedin accordancewithnationallyrecognizedstandardsanddesignedfora liveloadsuffICienttocmy a minimumof 7S.0CIJpounds.

I S£RVlNGTHEUNINCORPORATEDAREASOFLOSANQaES COUNTYN¥J THEanesOF:

I
_.....aounIl1~
tICU1KCA1'1
TOoft.Ierrv_,.WUTH()tUWO()O
WUT\NCI\'IlUOI

VHTI'I(R
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100$ PlUMCliO)""N~/« Iflo,,/}.J« 011:],0: 11)::.1 1\/

Page 6 ends

I

I 6.0 CommentsReceivedontheDraftInitialStudy/MitigatedNegativeDeclarationandResponses I
I
I Larry R. Hensley,DepartmentFacilityPlanner II
March8,2001
Page2
I Themaximumallowablegradeshallnotexceed15%exceptwherethetopographymakesitimpracticaltokeep withinsuchgrade,andthenanabsolutemaximumof20%willbeallowedforupto 150feetindistance. The averagemaximumallowedgrade,includingtopographydifficulties,shallbe nomorethan17%. Gradebreaks shallnotexceed10%in 10feet.

I
I INSTITtITIONAL:

Developmentmayrequirefire flowsup to 5,000gallonsper minuteat 20 poundspersquareinchresidual pressurefor up to a five-hourduration. Final fire flowswill be basedon the sizeof the buildings.their relationshiptootherstructures.propertylines.andtypesof constructionused. Firehydrantspacingshallbe 300feetandshallmeetthefollowingrequirements:I
I Noportionoflotfrontageshallbemorethan200feetviavehicularaccessfromapublicfirehydrant.

2. Nopordonofa buildingshallexceed400 feetviavehicularaccessfroma properlyspacedpublicfire hydrant.

I Turningradiishallnotbelessthan42feet. Thismeasurementshallbedeterminedatthecenterlineoftheroad.

A FireDepartmentapprovedturningareashallbeprovidedforalldrivewaysexceeding150feetinlengthand at theendof all cal-de-sacs. All on-sitedrivewaysshallprovidea minimumunobstructedwidthof26 feet, clear-to-sky.Theon-sitedrivewayistobewithin150feetofallponionsoftheexteriorwallsofthefirststory ofanybuilding. Drivewaywidthfor institutionaldevelopmentsshallbe increasedwhenanyof thefollowing conditionswillexist:I
I 1. Provide28feetinwidth.whena buildinghasthreeor morestories.or ismorethan3Sfeetinheight. aboveaccesslevel. Also. for usingfifetruckladders.thecenterlineof theaccessroadwayshallbe locatedparallelto,andwithin30 feetoftheexteriorwallononesideoftheproposedstructure.

I Provide34feetinwidth.whenparallelparkingisallowedononesideoftheaccessroadway/driveway.

Preferenceisthatsuchparkingisnota~jacenttothestructure.

Provide 42 feet in width. when parallel parking is allowed on each side of the access roadway/driveway.I 3.

4. All"FireLanes"willbedepictedonthefinalmap.andwillbedesignatedwiththeappropriatesignage. "FireLanes"areanyingress/egress.roadway/drivewaywithpavinglessthan34feetinwidth.andwill beclear-to-sky.I
I LIMITEDACCESSDEVICES(GATESETC.):

Anysinglegaleusedforingressandegressshallbeaminimumof26 feetinwidth.clear-to-sky.

I
I
D-l
(Cont'd)
ID-2
I PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclaration010()$PlumG••,'''. "~/<c 1ji1lll1).•/« 01:.10: II) :,!,1.11 Page6-10

I ________ ..;;,;6..2eqommentsReceivedontheDraftInitialStudy/MitigatedNegativeDeclarationandResponses I
I
I
I
Larry R. Hensley,DepartmentFacilityPlanner II
March 8, 2001
Page3
TRAFFICCALMINGMEASURES:

AJIproposalsfor trafficcalmingmeasures(speedhumpslbumps.trafficcircles. roundabouts,ete.) shallbe submittedto theFireDepartmentforreview,priorto implerneruation. 10-3 I
I

2. Anygateused fora singledirectionoftravel,usedinconjunctionwithanothergine,usedfortravelin theoppositedirection.(splitgates)shallhaveaminimumwidthof20 feeteach.clear-to-sky,

3. Gatesandlorcontroldevicesshallbepositioneda minimumofSOfeetfroma publicright-of-way,and shallbeprovidedwitha turnaroundbavinga minimumof 32 feetof rurningradius. If anintercom 0-2systemisused.the50feetshallbemeasuredfromtheright-of-waytothe intercomcontroldevi<:e. •(Coot'd) I
I

4. Alllimitedaccessdevicesshallbeofa type approvedbythe Fll'CDepartment.

5. Gateplansshallbe submittedto the FU'eDepartmem,prior to installation.Theseplansshallshowall locations.widthsanddetailsoftheproposedgates.

I
Shouldanyquestionsariseregardingdesignandconstruction.and/orwaterandaccess,pleasecontacCInspector , MikeMcHargueat(323)890-4243.

I
FORESTRYDIVISION- OTHERENVIRONMENTALCONCERNS:

Thestatutoryresponsibilitiesofthe CountyofLosAngelesFire DepartmentForestryDivisionincludeerosion control.watershedmanagement,rareand c:Ddangercdspecies,vegetation,fuelmodificaiionforVeryHighFII'C HazardSeverityZones or Fire Zone 4, archeologicaland cultural resourcesand the County Oak Tree 0-4 Ordinance.Theproposedprojectwillnot havesigniflC3lltenvironmentalimpactsintheseareas.

Ifyouhaveanyadditionalquestions.pleasecontactthisoffICeat(323) 890-4330.

Verytruly)'Olln,
I
!J...:.oI#~DAVIDR.LEININGER.ACTINGCHIEF,FORESTRYDIVISION

PREVENTIONBUREAU
DRL:lc
I
I
I
I PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclarationOlfXMPfu.,"Ca")'(J"N~«tfilf(,II"I(N," ,1-" :., I- W'.I''4,,, Page6-11 I

I
I
_______ __;;,6:.::.0_;~ommcntsReceived on the Draft Initial Study/Mitigated Negative Declaration and Responses Letter D:

I
I
I
Comment
Number
I
I
I
I
I
I
I
I
I
I
I
I
I
Response toComments fromthe County of Los Angeles
Fire Department, ForestryDivision
David R. Leininger,Acting Chief, Prevention Bureau
Response
The following County Fire Department codes and guidelines have been added to the Fire Protection discussion on page 3-17 of the Draft Initial Study/Mitigated Negative Declaration:
• Specific fire and life safety requirements for the construction phase shall be addressed at thebuilding fireplan check.
.. ~
• Every building constructed shall be accessible to Fire Department apparatus by way of access roadways, with an all weather surface of not less than the prescribed width, unobstructed, clear-to-sky. The roadway shall be extended to within 150feet of all portions of the exterior walls when measured by an unobstructed route around the exterior of thebuilding.
• The maximum allowable grade shall not exceed 15 percent, except where the topography makes it impractical to keep within such grade, and then an absolute maximum of20 percent shall be allowed for up to 150feet in distance. The average maximumallowed grade, including topography difficulties, shall be no morethan 17 percent. Gradebreaks shall not exceed 10percent in 10feet. • Fire flows up to 5,000 gallons per minute (gpm) at 20 pounds per square inch (psi) residual pressure for up to a five-hour duration may be required. Final fire flowswill be based on the size of the buildings, their relationship with other structures, property lines,and types of construction used. Fire hydrant spacing shallbe 300 feet and shall meetthe followingrequirements:

No portion of lot frontage shall be more than 200 feet via vehicular access from a public firehydrant.

No portion of a building shall exceed 400 feet via vehicular access from a properly spacedpublic firehydrant.
• Turning radiishall not be lessthan 42 feet. This measurement shall be determined at the centerline of the road. A Fire Department-approved turning area shall be provided forall driveways exceeding 150 feet in length and at the end of all cul-de­ sacs. All on-site driveways shall provide a minimum unobstructed width of 26 feet, clear-to-sky. The on-site driveway shall be within 150 feet of all portions of the exterior wallsof any building. .

The proposed project would not include limited access devices, such as gates or control devices.

Page 6 ends

I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration f)1(}()3Plu".Cll"J(H'NtrJC'C'fi"~II}d('('"'.!'~fJ''''I ~''''

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I Letter D: Response to Comments fromthe County of Los Angeles - (Continued) Fire Department, Forestry Division
David R.Leininger, Acting Chief, Prevention BureauI
I
I
Comment
Number Response
D-3 The proposed project would not include any traffic calming measures, such as speed humps/bumps, traffic circles, roundabouts, etc.

D-4 According to the County of Los Angeles Fire Department Forestry Division, the proposed project would not have significant impacts on erosion control, watershed management, rare and endangered species, vegetation, fuel modification for Very High Fire.Hazard SeverityZones or Fire Zone 4, archaeological and cultural resources and the County OakTree Ordinance.which are statutory responsibilities of the FireDepartment.

I
I
I
I
I
I
I
I
I
I
I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 01003Plum("tIll.'''''NtgtlC'('(jim,/,I":~, l'r:~ n:10::S,UI

Page 6 ends

I

I
I
I
a, The Department suggests that portions of the proposed project site supporting higher qualify esccould support habitat for the Federally Threatened California gnatcatcher (eGC). The Department recommends that a focused survey for eGC be performed by authorized Individuals following U.S. Fish and Wildlife Service survey protocol to determine presence or absence. Proposed project activities could result In adverse impacts to the eGC andlor occupied habitat E-l
I
I

6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses

LETTERE
I
I
SouthCoa~ A~:or.
49-WY;~~Av~~

5.0",Oiego.c"lik:mia92!23
(;sa) 457-4201
FAX(asS)487-4239
I
I
I
March 12.2001
'!-Jr.Larry Hensley
los Anop.lesCounty OApartment of Parks and RecrAatlon
&33South Vermont Avenue. 4'" Floor
Los Anpeles. CA 90020
Dear .'v;r. Hensley:

Draft Negative Declaration for
Plum Canyon County Park
SCH ti2001021050. Los' Angeles County
The Department of Fish and Game (Department) appreciates this opportunity to commem on the Initiai Study and Negative Declaration (ISIND) for the above-referenced project. relative to impacts to biological resources. The proposed project consists of developing a 7 acre Counlv Pari<on a 13 acre undeveloped site located east of North Via Joyce Drive and north of Plum Canyon Road. east of the City of Santa Clarita. .

I
I
The following statements and comments have been prepared pursuant to the Department's authority as Trustee Agency with jurisdiction over natural resources affected by the project (CEOA Section 15386) and pursuant to our authority as a Responsible Agency under CEQA Section 15381 over those aspects of the proposed project that come under the purview of the California Endangered Species Act (Fish and Game Code Section 2050 et seq) and Fish and Game Code Section 1600 et sen..

I Imoacts to Bi9lo!;Jlcal ResourcC$
~'. According to the IS, the 7 acre proposed park consists of disturbed coastal sage scrub (CSC) and is located immediately adjacent to areas delineated as higher quality CSC. • I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration OltXMPlumC,mn,.#JI"'t ,I t.Il'l' 11t'l( Of :.'/0: 10::S.4.\1

Page 6 ends

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I
I
E-2
I
I
Mr.l arrv Henstev
March 1'2.2001.

PaaeTwo
I
I

2. .whichwouldbeconsideredsi~nificantunderCedA. Resultsofthefocused survevwillassisttheleadaaencvindetermininothelevelofCeQAreview. avoidanceandmitiaationmeasuresforthisoroDosedoroiect.

The Proposedprojectmavresultintheremoval/disturbanceofveaetationand thereforehasthepotentialtodirectlvImpactanumberofnestinan'alivebirdsoecles. a. Miaraiorvnonoamenativebirdsoeciesareorotectedbvintemationaltreaty underthe FederalMiqratoryBirdTreatyAct(MBTA)of 1918(50C.F.R.Section

10.13),Sections3503.3503.5and3513 oftheCalifomiaFishandGameCode orahibittakeot all birdsandtheiractivenests includinQraotorsandother miaratorvnongamebirds (aslistedundertheFederalMBTA).

IE-I(Cont'd)
I
b. Prooosedcroiectactivities(includinadisturbancesto nativeandnon-nauve v~etatlon) shouldtakeplaceoutsideofthebreedlnpbirdseasonwhich aenerallvrunsfromMarch1-Auaust31(aseanvasFebruarv1forraotorsi to avoidtake(includfnadistUrbanceswhichwouldCauseabandonmentofactive nestscontaininaeaasand/orvounal. Takemeanstohunt.cursue.catch. capture.orkill.orattempttoh·unt.pursue.catch,captureofkill(FishandGame CodeSection86).

E-3
I
I
c. Iforoiectactivitiescannotfeasiblelvavoidthebreedinabirdseason.the Q Departmentrecommendsthatb~rnnina thirtYdaysorlortothedisturbanceof suitablenestinahabitattheprojectproponentshouldarrangeforweeklybird survevstodefectanyorotectednativebirdsinthehabitattobe removedand anvothersuchhabitatwithin300feetoftheconstructionworkarea(within500 feetforraptors), Thesurveysshouldbe conductedbvaQualifiedbloloQistwith exoerienceinconductin9breedingbirdsurveys.Thesurveysshouldcontinue onaweeklvbasiswiththelastsurveybein$lconductednomorethan3days criortotheinitiationofclearance/constructionwork. Ifaoro1ectednativebirdis found, theoroiectorooonentshoulddelavallclearance/construction disturbanceactivitiesinsuitablenestinQhabitatorwithin300feetofnesting E-4 habitat(within500feetforraptornestinohabitat)untilAuqust31orcontinuethe survevsinordertolocateanvnests. IfanactivenestIslocated.clearinaand constnsctionwithin300feetofthenest(within500 feetforraotornests)-shallbe ocstooneduntilthenestIsvacatedandiuvenileshavef1edaedandwhenthere isnoevidenceofasecondaHemotatnestino. limits o~constructiontoavoida nestshouldbeestablishedinthefieldwithf1aaainoandstakesorconstruction fencina.Constructionoersonnelshouldbe inStructedonthesensitivitvofthe area. Theoraiectorooonentshouldrecordtheresultsoftherecommended orotectivemeasuresdescribedabovetodocumentcomollancewithaoolicabie StateandFederallawsoertatninqtotheorotectionofnativebirds.

I
I
I
I
I
I Plum Canyo~1County Park Project Final Initial Study/Mitigated Negative Declaration OI()()JPlllmC '.' '" "'~k~ l/i1U11I,J«Olf]}IO: 10.']$.UI

Page 6 ends

I

I
I

6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I
I
a. Ifa wildlife survevwas conductedwithin orocosed oroiect imoact areas several soecressuch ascoast homed lizard.coastal western whictaii and sensitive nesting bird soecies would not have been detected Inthe month of November.

The Oeoartmentrecommendsa bloloaicalsurvev be conducted durina the aocroonate seasonto maximizedetection of sensitive wildlife soecies. Results of the'botanical survevwill assistthe lead aaencv Indeterminina the level of CEOA review.avoidance and mitiaationmeasures for this oroDosedoroiect.

E-5
I
I
I
I lmnacts to BotanIcal Resources
I 1 The 8ioloaiesl reconnaissance referencedin the ISwas conducted on NovembBr 1~. 2000. The ISdoes not make clearas to if a botanical survev for sensitive olant soecieswas conducted.

I
a. Ifa botanical surveywas conductedwithin proposed proJectimpact areas. many E-t>seasonal herbaceous soecies would not have been detected in the month of November. The Oeoartmentrecommendsa botanical survev in the aoorooriate seasonfollowina willter rainsto maximizedetection of sensitive herbaceous soecies. Results ofthe botanicalsurveywill assist the teadaaencv In determlninc the levelof CECA review.avoidance and mitiaation measures Tor this orooosed orolect.

I
I Imoacts toOrainaocs " }..,;;;:'" ~{
(j~ -
TheISstates that there are two dralnaceswithin the impact area of the proposed 1~oroiect site. . 1\ n"r....~ . \A A.I'Ii l,Ufi" E-7a. A STreambedAiteralion Aereement between the u90an:merlT Wndme !..e:a!:
fl~~!'1~'!m~'! ~ ~I.!!r'l'~ fo!':!n'!~!t~!'?tlt;''1nf tf,,?ln~~,=!: !nd!.!~!!1~f!!!!n~('r' rnn\lt:orc::iI'Intf'l cmhcmrf.:aI'Atfraino:
4 •I
I
I o. The Deoartmenfs issuance of a stream bed alteration aereementis considered a oroiect that Issubiect to CEOA. To facilitate our Issuanceof the aareement. the Deoartment as a resoonsibleaaencv under CECA mayconsider the local iUrisdlction's(leadaaencv) docume-ntfor the oroiect. To minimize additional E-8 reaulrements bvthe DeDartmentunder CECA the document should fullv identify the ootential imoacts to'an" dralnaae or rioarian resources and orovide adeauate avoidance. mitioation.monitorina and reoortina commitments for issuance of the aoreement, If imoactsto the on site drainaae will occur. the I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 01003PI"",('II"'''"N~/r<'(fi",,').J~ OIl:JIO:10'rzs,1.1/

Page 6 ends

I

I 6.0 Comments Received on the Draft Initial Study/MItigated Negative Declaration and Responses I
I
proposedISINDdoes notprovidetheadequateinformationneeessarvfortng Deoartmenttoconsiderastreambedaareementat thIstime. Modificationofthe proposed projectmaybe requiredtoavoidorreduceimDactstodrainaaes. E-8TheDeDartmentsuoaeststhatthe remafninawashwithintheDOrtionof the site (Cont'd) notDlannedforDarkconstructioncouldSUDoorton-sitemitiaationDOtentiaJfor unavoIdableoro'jedalterationstodrainaaes. PleasecontactMs.Bettv Courtneyat(661)263-8306todiscussfurther.

I
I
I
Mr.tarrv Hensi&.·
March 12.200~ .

PaaeFour
I
I Mitiaation for CumulativeImeacts'
I
I
Reoionallv.muchofthenativeesc(ararenaturtJicommunitYconsfderedverY threatenedbv theDeoartmentl andassociatedWildlifehabitat surmundinaUteorooosed oroiectsitehasbeen losttosuburbanusesand/orIsInthe olanninaor imD'lementatiOnstaoe ofbeinaconvertedtosuburbanuses.Lossofesc habitatshould be.conslderadasianiflcantadverse!maadunderCEOA. The Oeoartrnent E-9 recommendsthattheremaininaDOrtfonofthe sitenot orooosedfo;'Darkdevelooment be arotectedundera deed restrictiontoereserveItshabitatvaluesforwildlifeandto mitiaateforthecumulativelossofeschabitat
I InconclusiontheDeeartmentrecommendsthatthe aboveconcernsbe addressedDrfor to leadaeencvaoorovatoftheDroDOsedoroiect. .

I
ThankvouforthisoDoortunitvtocommentonthisorooosedDroiect. Questions reaardinathis IeUerandfurthercoordinationontheseiS8Ue:sshoufdbe directedto Mr.Scott Harris.AssociateWildlifeBioloaistat (818)360-8140.

I 'b._
Mr.C.F.Ravsbrook fReaionofManaaerI
.1
Ms.MoraanWehtiE
Ms.MarvMever
Ms.BettvCourtnev
OeDartmentofF"lShandGame
I Mr.RavRNJn~!d
U.S. F=i,::h~nd Wildlife Sarvjca. VQntur~
I
I
I Plum Canyon County Park Project Final Initial Study/MitIgated Negative Declaration OIOCJPI.M ('".,,,,, NtgJt(' rJi,,"/J.rl«011:)10:10::.1.11/

Page 6 ends

I
I

6.0 Comments Received on the Draft Initial StudylMitlgated Negative Declaration and Responses Letter E:

I
I
I
Comment
Number
E-I
I
I " .

I
I E-2
I
I
I
E-3
E-4
I
I
I
E-5
I E-6
I
l
Response toComments fromthe State of California
Department ofFish and Game
Scott Harris, Associate Wildlife Biologist
Response
During preparation of this Final Initial Study/Mitigated Negative Declaration, consultations with the California Department of Fish and Game (CDFG) were conducted to address CDFG's comments andconcerns regarding theproposedproject. Specifically, adverse impacts to the higher quality coastal sage scrub, which could potentially support the federally listed threatened California gnatcatcher, were discussed with CDFG.

According to Mr. Scott Harris, Associate Wildlife Biologist with CDFG, since the site is rather degraded, construction impacts on the California gnatcatcher would not be significant if grading activities were to occur outside of the breeding season, which generally runs as early as February 1 through August 31 (pers. comm. March 2001).

However, based on similar consultations with the U.S. Fish and Wildlife Service (USFWS), focused California gnatcatcher surveys were reconunended; the County has recently completed such surveys. No California gnatcatchers wereobserved on site or in the surrounding areas during the focused surveys.

The County is proposing to initiate construction in November, during the non-breeding season. Both the CDFG (Mr. Scott Harris) and USFWS (Mr. Rick Farris [Senior Ecologist] and Ms. Louise Lampara [Fish and Wildlife Biologist]) have concurred that avoidance of the breeding season would suffice for compliance with the Migratory Bird Treaty Act. Mitigation measures have been added to the ISIMND in the event that construction occurs during the breeding season.

Construction activities (including vegetation disturbance and removal) will be initiated during the non-breeding season (September 1 through February 28). All required vegetation disturbance will occur during the non-breeding season.

If construction activities are required during the breeding season (March I through August 31), all vegetation on site and within a 300-foot buffer surrounding the site will be monitored bya qualified biologist. If any nesting activity is detected withinthe site or 300-foot buffer, all construction will cease within 300 feet of the active nest until all breeding/nesting activity has been completed at that location.

In response to CDFG concerns, an additional site survey was conducted on April 4, 2001. The results of this spring faunal survey have been incorporated into the ISIMND.

No sensitive animal species were observed or detected on,oradjacent to, the site.

In response to CDFG concerns, an additional site survey was conducted on April 4, 200I. The results of this Spring floral survey have been incorporated into the ISIMND.

No sensitive plant species were observed on, or adjacent to,the site.

J Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration OI()I).JPlumC;""1n NtgJr<:(jI."I).J« 01l:JIO:IO::S.1.11

Page 6 ends

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

6.0 Comments Received on the Draft Initial StudylMUlgated Negative Declaration and Responses Letter E:

Comment
Number
E-7
E-8
E-9
Response to Comments fromthe State of California - (Continued) Department ofFish and Game
Scott Harris, Associate Wildlife Biologist
Response
Ms. Betty Courtney of CDFG was contacted regarding impacts to on-site drainages.

Based on Ms. Courtney's visit to the project site on March 30, 2001, these drainages were determined to be under CDFG jurisdiction. Therefore, because these drainages would be altered as a result of the proposed project, a Streambed Alteration Agreement would be required to complywith Section 1601of the Fish and Game Code.

The County of Los Angeles Department of Parks and Recreation will submit to CDFG a notification package upon certification of this Final ISIMND. The notification package will include identification of project impacts to on-site drainages and will provide mitigation, monitoring, and reporting commitments for issuance of the Streambed Alteration Agreement. According to Ms. Courtney, the proposed project would have a minor impact on the on-site drainages under CDFG jurisdiction. However, because of CDFG's no net loss policy, impacts to the two on-site drainages would need to be mitigated. As indicated by CDFG, a 1.5:1 mitigationratio would be required for the proposed project. Mitigation acreage would need to account for 0.069 acre of plantings.

A mitigation measure has been incorporated into the ISIMND to address impacts to the CDFGjurisdictional areas.

The County has no plans to develop the remaining portion (approximately six acres) of theproject site at this time. However, the County wishes to havethe option ofbeingable to develop the remainder of the site for future park expansion. Any development plans proposed for the remaining six acres would be subject to future environmental analysis and CEQA documentation. ,

Page 6 ends

OIOOJPl.", C'In)'OnNl:K<lrrifl""'}"~OII:JIO: IO::J ,ut

I 6.0 Comments Received on the Draft Initial Study/MItigated Negative Declaration and Responses

I LETTERF
I City of
Santa Clarita
•23920ValenciaBlvd.

Suito 120
Santa Clarita
California91355-2196
•Phone
(SSI) 255-4910
Fax
(661)255-1996
I
I March 14,2001
I ·Mr.Larry Hensley
ActingChiofofPlanning
County ofLosAngeles
Department ofParks and Recreation
433South VermontAvenue,4'"Floor
LosAngeles.CA 90020
..

I
I Dear Mr. Hensley:

SUBJECT: .PLUMCANYONPARK- DRAFl'.INITIALSTUDYI
MIl1GATEDNEGATIVEDECLARATION
I ·The City of Santa Clarita's Parks, Recreation. and Community Services Department wouldliketothank youforthe opportunity toreviewand comment on the above stated document. It is likely that the Plum Canyon Park and neighboring community will be annexed into the City in the future, and therefore, the City would then assume responsibility for the maintenance of Plum CanyonPark.

Duringthe programming ofthe Plum Canyon Park, the possibilityforadditional parking may become necessary. The softball field, during a normal T·ball season, wouldrequire parking for a minimum of40 cars (20 spaces for those players onthe field.and an additional 20spaces forthose arriving fer tho next game). In addition. the remainder of the site would require parking for the tennis court,basketball court,group picnic area. horseshoe pit. and the tot-lot playarea allofwhichwillbeutilizedduring the same time periodas the softball program.
·Additional commentsregarding the park design areasfollows:

F-l
I
I
I F-2
I
I • The size of the restroom is extremely small, and should be increased to accommodatethree stalls onthe women and men's sideofthe restroomwith twosinks oneither side.
• The plan for the athletic field (pages 1-6) identifies lighting control to be located on the exterior of the restroom building. What lighting will this control?
F-3
I
I
I PRINTED0II11!CYa!DP}J'£R
I Plum C:III)011 County Park Project Final Initial Study/Mitigated Negative Declaration 011)()JI'll"" I ';"", '. \'1"(11« 1/i.1I/).doc011:110:10::$ ,4.1(

Page 6 ends

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Mr.LanyHensley
March14,2001
Page2.
•Theathleticfieldisdescribedasabaseballfield.ThoCitywouldrecommend thatitbereferredtoasasoftballfieldanddesignedtosoftballspecifications. • WiththehighdemAndonpa:rkspaceintheSantaClaritaValIey,theCityhas de~rminodthat conilictresultswhonplacinganoverlayaportafieldinthe F-3outfieldof80ftba11diAmond,AJldthi5situationistobeavoided..Asamult, (Cont'd) thoCitywouldrecommendeUminatingthesportsfieldoverlay.

Additionalparking.orreducingthe number ofparkcomponents,~y be necessaryinordertoreducetheb'afficimpacttothe neighborhood.

The Cityrealizes that the site is outside itsjuriadietion,and offersthese commentawiththeexpectationthat thofuturemaintenanceandprogramming ofPlumCenyonParkwillbecometherespon81DUityoftheCityofSantaClarita.

ShouldyouhaveanyquestiOD!.pleasecontactmoat (661)286-4023. ~ReillY
ParkDevelopmentAdministrator
1'R:RL:mpl
,ww./,.....,,,.,.~,.,u.c
I Plum Canyon County Park Project Final Initial Study/MItigated Negative DeclarationO/()()JPI"", c,••,,,•.\'('g.J«:Iji.,,/j ..J« 01l:},'0: 10':1,/.11

Page 6 ends

I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100JPlUMCd~'''~,\'~ ecl/imlfl JtX'OI':J/O: 10':S.1.11

Page 6 ends

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I Letter F: Response to Comments fromthe City of Santa Clarita Tom Reilly, Park Development Administrator
I
I
I
Comment
Number Response
F-l The County concurs that it is likely that Plum Canyon County Park will be annexed into the City of Santa Clarita in the future. At that time, the City would assume the responsibility of park maintenance; however, the County will assume responsibility for park maintenance until that time.

I F-2 The proposed project would provide a total of 30 parking spaces. If parking demand exceeds on-site parking capacity during peak periods of use, the excess parking demand would be easily satisfied by.on-street parking on Via Joyce Drive for short-termneeds.

I F-3 The designs of the restroom and athletic field facilities arenot environmental issues and, therefore, do not pertain to the CEQA process. The City's comments regarding these park design issues have been forwarded to the Department's Project Management Division for consideration.I
I
I
I
I
I
I
I
I

I
I

6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I
•Cr&yDlvls
CO\'1»:OJ.I
I I
I
'I
I
I
I
I
I
I
I
I
I
I
I
I

LETIERG
STATE Of CAtnO"!HA
Governor's OfficeofPlanning and Research
State Clearinghouse
-~§(~.).~..~
Steft NIss.=
/lc1lCTO&
Matthll.lOO1
Laay Hensley
los Aagelef ColIZIt)'
433SowhVCIDDOZI1AYCmIe
Loc.A.JJae1es.CA90020
Subjcd: PlumCaeyozlC(JIJ1J1:JParlc~
S~: 2001021050
Dear(.any Hemler-
The cocbcdCOIZII:ICC(.)OIl)'OUr NtptiYO~ was(wen:)rectiYc4bythoSCata~ afte:thecu!o!1he&We miew pcziod.'fIbic:hcloMdOIl Much 14,2001. W. arc:rorwardiq 1hcJe ,Coa,aICZIU to)'0'0 bKauM !beyprovide&sbmationorraiseissuesthatshouldbe ~ inyour1Iml ~~
TbI C"jfomia~ QI.laUtyAa does~ requireLcad~ to ~ lOJU:COI%ID"b H~. weCDCOUn&O)'OIllOiDc:otpor.a%O1hcHIdditiooaalcormnctC' imoywr &al ~ docuz:DezIEaMlOcoaddct diemprior lOtaki&1IfiDalllCtiocoa- pcopocedpcojecf.

Please CCIItI.Ct!beSWcQ~ at(916) 445-4)613ityoohavo UI)' qontioas c:woemiaatho tnwi&ocmmtalreviewpcocetS. I!)'O'1have•qIICStioDnp:diJlg !beabcrie-mmedprojca.pIcaictd= lO tho~, State QeariDaboIUc'I)Imlbcr (20010210s0) .wbmeocmccinathisot!S«. o-r
1400nNl"H STUE1' r.o.1OX}044 SAClA\l1NTO.c.\WOu.lA 9}3n-)044 9l6.....~) lAX9I6-J2l-lOl4 'Ft'W'.o~COVla!A.1JNC!lOUSUJ'Nl. •
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/()()JPI.", C"~I""N~/«' f/1~iI/).,I« 011:)10: /0::$ AM

Page 6 ends

I
I
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration olm PI.", ClIn),onNeg.I« Ij1nllll./,,",(I/l:J,'O: 10::',1.11

Page 6 ends

6,0 Comments Received on the Draft Initial Study/MItigated Negative Declaration and Responses I
I
I
D!PARTMEHTOFTRANSPORTATION
omenOFADVANC8PLANNING
DISTRICT1.1GR.OmCE 1·1OC
120SO.SPRINGST.

LOSANGELeS.CA90012
TEL:(213)191-0696A155: S-647-6696
FAX:(213)891-6317
I
I
IORICEQAcsIOI0306
NEGDEC
~otLos ADgcles. Squs
P2umCao)'m ec.mtyPIrk
2B22N.VJ1Ioyc:oDt.

VIC.LA.-126012.~
SCH1I20010210SO'-=R=-=E=C~E=IV"""'E--D-J
MAR2O'2001'
~afA1ir~
I
I
nc.rMr.Licmoey.
'IhIIIk'ycuforinc!udiosCallnasil11bccmiloammulrcriclwprocossfor'1ho~caticDcd~ 1BucdOIl thoin!crmaticarcc:eiwd,wehawDOc:cmmcaCS.1hiItizuc.11awava'..... m:ocm-dW G-2ooastructimrolatedaudctripsOIl StIas~ys tIDC1h.iaJnnIyIbe1imbdtooft'.pe.akCCII:QJZlUoperiods alODiCXlOgesUdccxrldors.

I!youba"YCmycp)CSt{cmltp1diua OIXr=pOIlJC,r* toCaJInIu IGRlC2QA1l«lord"csIOI0306,tDd plcae doDotbcsiQtctoCCI1tIICtmeat(213)197.:.em. '.

SiDcc:rCJY.

I
I S1lll'HENBUSWELL
I~QAPropm Mmagu-
CIC!Mr. Sc:oaM«pa. StIleClelriD&hooso
I
I
I
I
I
I
I

I
I

6.0 Comments Received on the Draft Initial StudylMitigated Negative Declaration and Responses Letter G:

I
I
I
Comment
Number
G-I
I G-2
I
I
I
I
I
I
I
I
I
I
I
I
Response to Comments from the State of California
Governor's Office ofPlanning and Research, State Clearinghouse Terry Roberts, SeniorPlanner
Response
The State Clearinghouse received comments from the State of California Department of . Transportation (Caltrans) after the end of the state review period, which closed onMarch 14,2001. However, these comments are still considered and have been incorporated in this document.

Caltrans has no comments on the project at this time. Caltrans' recommendation that construction-related truck trips on State freeways and highways be limited to off-peak commute periods along congested corridors has 'been considered. As stated in Section XV, Transportation/Circulation, no more than five delivery trips would be expected per day, largely because all heavy equipment would be staged on-site. Due to the limited number of vehicle and truck trips expected per day, construction activities would not alter normal traffic conditions around theproject site.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100$PI"", C""'OII N<'l'I(t' (j'IIN,/I"I« OIl:J/O: 10':J 1.11

Page 6 ends

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I
I
UnderSection3, HydrologyandWaterQualitywerediscussedinsubsectionVIII. Morc specifically. par;agraphs (c) through (1)stated that existing drainage pattem would be maintainedandrunoffwouldbedirectedtothelocaldrains. Theamountofrunoffwould notsubstantiallyincreaseandnomltlgatfonmeasureswererequired. Therefore,atthis time,wehavenocomment.

Inthe eventthatthesubjectproject willresultintheconnectionto ormodlftcationofany oftheDepartment's drainagefacilltieaorincreasetOOflow Intothestormdrainsystem, a permit mustbesecuredfromtheDepartmenfs ConstructionDivision,PermitsSectionon the 8th floor.

If you have any questions, please contact Mr. Cart Chow at (626) 45EJ.7B53or Mr.GregEvenat (626)4SEJ.7994.

H-l
I
I
I

LETTERH

COUNTY OF LOS ANGELES

DEPARTMENT OF PUBLIC WORKS
I March27,2001
I Mr.LarryR.Hensley,DepartmentFacilityPlannerII
Countyoflos Angeles
DepartmentofParksandRecreation
433SouthVermontAvenue,4th Floor
los Angeles.CA90020:-1975 .

DearMr.Hensley:
,'OISINO~NINNV1d
I
I
lOOZs0HdV
03AJ30:ru
I
I
RESPONSETOA DRAFTINITlALSTUDYIMJnGATEDNEGATIVEDEClARATION.

PLUMCANYONCOUNiY PARK
Thankyou for the opportunityto providecommentson the DraftInitiaJStudylMitfgated NegativeDeclaration (ISlMND)forthoproposedPlumCanyonCountyPark.Althoughwe havenotcompletedthereviewoftheISlMND,we offerthefollowingcomments.Wewill forwardadditionalcommentswhenwecompleteour review.

I
I
I
I
I
I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration Ol()l)$PI.,. (~"")n \-'W«'1/ilf(,I}"I« 011:110:10::.1,,1,11

Page 6 ends

I

I
I
I
I
I
I
I'
I
I
I
I
I
I
I
I
I
I
I
I

6.0 Comments Received on the Draft Initial Study/MItigated Negative Declaration and Responses Mr.LarryR.Hensley
March27,2001
Page2
EnvironmentalPro~rams
Should any operation within the SUbject redevelopment project include the ~nstructionnnstallation, modification,or removalof underground storage tanks and/or IOdustrialwastecontrolordisposalfacilities,thisDepartment'sEnvironmentalPrograms Divisionmustbe contactedforrequiredapprovalsandoperatingpermits.

TheNationalPollutantDischargeEliminationSystemMunicipalStonnwaterPermitissued to LosAngelesCountyand85citiesbythe LosAngeles RegionalWater QualityControl Board on July 15, 1996, required the development and implementation of programs addressingstormwaterpollutionissuesIndevelopmentplanningforprivateprojects. Part oftheresultingprogramtoresolvethesestormwaterpollutionIssuesisaStandardUrban StormwaterMitigationPlan(SUSMP).Alldevelopmentandredevelopmentprojectswhich fallIntooneoftheSUSMPprojecttypes,characteristicsoractivitiesmustobtainSUSMP approval. Additionally, the appropriatepost construction Best Management Practices selectedand incorporatedintothe projectplansshould be in compliancewiththe local jurisdiction'sDevelopmentPlanningProgramandtheSUSMP.

If you have any questions regarding the 'above comments, 'please contact Mr.SiyavashAraumi at (626)458-4991.

H-2
H-3
.LandDeyelopment(Gradingand Drainage)
Theapplicantshallsubmitadrainageconceptforreviewandapprovalpriortoapprovalof theseenvironmentaldocuments. Thisprojectmay-alsoImpactwater qualityandshould incorporatepermanent post-constructionBest Management Practices to mitigate this impact.Theseplansmustbereviewedbythisdepartmentpriorto issuanceofanypermits. 'If you have any questions in regard to the above comments, please contact Mr.PerfectoTobiasat(626)458-4921.

H-4
LandDevelopment(GeologyandSoils)
Theproposedprojectwill nothavesignificantenvIronmentaleffects from ageologyand Isoilsstandpoint,providedtheappropriateordinancesand codes are followed.

If you have any questions in regard to the above comments, ple~se contact Mr.FredGharibat (626)4584923.

H-S
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration Ol()()$PI.",c...,,,.Nrg.J<c/fl.III),o/(}('nJ:"(): !()':« 1.11

Page 6 ends

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses

Page 6 ends

1 I
I Mr. LarryR.Hensley
March27,2001
Page3
I gyou have any questions regarding the environmental reviewing process of this (6~~)~~::'a~1~I~ase contact Mr. Craig David at the add~ess on the first page or at I
I
Verytrt1fyyours,
.t;t;flsA.NOYES
(~orOfieW
ROO. BOM TOAssis tDeputy Director
Watershed Management Division
MM:swC.IDtN.~""m\2t.yCld
I
I
'I
1 I
1 I
I
1 1
I
1 Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0/003Plum (;,.. "" \',vyl«Iji."lrJ<J(' 0/':10: 10,:504.1(

I
I
I
LetterH:

I Comment
Number
H-l
I
I H-2
I
I H-3
I
I
I H-4
I H-5
I
I
I
I
I
I

6.0 Comments Received on the Draft Initial Study/Mitigated Negative DeclaratIon and Responses Response toComments from the County of Los Angeles
Department of Public Works, Watershed Management Division Rod H.Kobomoto, Assistant Deputy Director
Response
According to the County of Los Angeles Department of Public Works (DPW), it has no comments on the Draft ISIMND at this time. However, in the event that the proposed project would result in the connection to or modification of any of PPW's drainage facilities or increase the flow into the storm drain system, the proposed project would obtain anyrequired permits from DPW.

Underground storage tanks,(USTs) and industrial waste control or disposal facilities are not currently present on the project site. The proposed project would not involve construction/installation, modification, orremoval ofUSTs or industrial waste control or disposal facilities.

As discussed in Section Vlll, Hydrology and Water Quality, construction of Plum Canyon County Park would disturb approximately seven acres of land area; therefore, a National Pollution Discharge Elimination System (NPDES) permit would be required for the project. Compliance with the permit requirements would ensure that storm water . runoff-related impacts would be less than significant; therefore, no mitigation measures are required. Permit requirements include obtaining Standard Urban ..Stormwater Mitigation Plan (SUSMP) approval and implementation of Best Management Practices (BMPs) during project construction and operation.

The County will submit a drainage concept to DPW for review and approval prior to approval of the proposed project and certification of the Final ISIMND. As part of the NPDES permit, permanent post-construction Best Management Practices (BMPs)would be incorporated into theproject design tominimize impacts to water quality.

As stated by DPW, the proposed project would comply with all applicable ordinances and codes; therefore, it would not have significant environmental effects froma geology and soils standpoint,

Page 6 ends

I Plum Canyon County Park Project Final Initial Study/MitIgated Negative Declaration 0100$PlUMC""VH \,v.'~" I'i""fl,/()(' 0111JI0110.:J ."

I
I

6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses LETTER!
I aWllutoQH.lIkkox
S«'(14'1/'"EIfYirQ"",uutd
P,OlU;I/4,.

CaliforniaRegionalWater Quality Control Board
Los Angeles Region
I
I
320W.4thSlI'Uf,SulwlOO.LosAn"l.,. Catifomil90013
Phone(213)$16-6600FAX(213)S7~640
Inlmla N!dresI: http://wNw.,,,,"b.ca.p/-1'IO'qcb4
GrayD",b09_
April30.2001
I
I
CountyofLosAngeles
Attn:LarryHensley
433SouthVermontA\ICr.

LosAngeles,CA 90020
DearSirorM.,

RECENEO
t.\A~! 1001
p~NING DlVISIOt.!
Re:CEOADocumentationforProjectintheSantaClaraWatershed
I Ply,mCanyon CountyPark Development:seaNo. 200102050
I
WoappreciatetheopportunitytocommentontheCEQAdocumentationfortheabove. mentionedproject. ForyourinformationaJistof~tting requirementsandRegionalBoard ContactsisprovidedinAttachmentAhereto.

I
TheprojectsiteliesintheSantaClarawatershedthatwaslisted asbeingImpairedpursuantto Section 303 (d) of the Clean WaterAct. Impainncntslistedinreachesdownstreamfromthe proposedprojectincludenutrientsandtheireffects,salts,coliformbacteria,andhistoric pesticides. TheLosAngelesRegionalWaterQuality ControlBoardwillbedevelopingTotal MaximumDailyLoads(TMDLs) forthewatershed,buttheproposedprojectisexpectedte proceedbeforeapplicableTMDLsarcadopted. Intheinterim.,the RegionalBoardmustcarefully evaluatethepotentialimpactsofnewprojectsthatmaydischargetoimpairedwaterbodies.I I Ourreviewofyourdocumentationshowsthat itdoesnotincludeinformationonhowthisproject willchangetheloadingofthesepollutantsintothewatershed.Pleaseprovidethefollowing additionalinformationforboththeconstructionandoperationalphasesoftheproject. • for eachconstituentlistedabove,pleaseprovideanestiinate'ot'theconcentration(Ppb) andloadObslday)fromnon-pointandpoint sourcedischarges.

I • Estimatesoftheamountofadditionalrunoffgeneratedbytheprojectduringwetanddry I-I seasons.

I
• Estimateoftheamountofincreasedordecreasedpercolationduetotheproject, I
I
•Estimatesofthenetchangeincubicfeetper secondofgroundwaterandsurfacewater contributionsunderhistoricdroughtconditions(ascompiledbylocalwaterpurveyors, theDepartxnentofWaterResources,andothers),and IO-yearSO-year,andlOO-year floodconditions.

I CaliforniaEnvironmental ProtectionAgency
aRIQ'f:iNPit/Hf"
0", fI!lui01l 1110JHQ_ ()1Id«}lAMetIt~'7"41ityo/Ctzlifo"'Ia,',WIn'"f'Uo1ueufo,1Mw.,tfI.o/,rut1tlllNlfolw- PI_UQItl.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Dec:laratlon O/()()JPt."" (".,.,"" ",",-;:./«(ji",111"oX"011:)10: /0::$ .4,11

Page 6 ends

]

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration OIOOJPluMCa,..". NtgJ<'Cffi""IJ.•I« o,,:JIO:10::} .I.I(

Page 6 ends

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I
I Pagelof2 •-2- 'April 30.2001
I
I
If youhaveanyquestionspleasecallmeat (213)5766683orRick Vergetsat(213)576668B. ,Sincerely,
I·
I
ElizabethErickson
AssociateGeologist,TMDLUnit
'LosAn'geles"'RegionalWaterQualityControlBoard
I ·EE
Attachments (1)
cc:
1 State Clearinghouse
File
1 I
I
I
I
I
I
I
California En vironmellUllProtection Agency
o~ttyctttdPcpt"

0.., ",lsliM II'" 1"'uuv, tiM 4MtI1'1CCIIorqlUl/(ty(lfCGltforttla.',WIIICI'res«..,cuf(lr 1!wIbtllt/fl ofpru.rIl gJtdfoJv~ :'"C1'lfril11J1.

I
I

I
I

6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaratlon and Responses I •AlTACHMENTA
I './ Ifthoproposedprojectwillr(l3uttIna d~chlJrgoof drod!J9or fill Into " .surfacowator Qncludipga dry3tr&&mbed). andi$subjectto a fe®r.l1 license or permIt.tho projectmayrequirea Section401 WaterQualityQlltification.or waiverofWastoDischargoRequirements.Forl'urtherInformation.pleasecontact:

I AnthonyKklena.NonpointSourceUnitat(213)576..Q785•
•./ If thoprojectinvolvesInland dJ.sposafof nonh:lZ:lrdoU3contamlnlltad soils and materials. theproposedproject maybe_'ubjectto WasteDi$cha[f1oReq(l{rements.Forfurtherinfotn1atioo.ploasocolll3ct ROdneyNelson,LandfilbUnit.at(213)576-6719.

I ...

I ./ IftheovoralPro]eclareaIslargerthanfive actN, !heproposedprojectmaybe _,ubJectto !he StaleBoflrd'sGen~ ConnructJOlJActJviIyStoanWaterPermit.Forl'urlllorinformation.pleasocontact:

TracyWoods,St:ltewideGeneralConstructionActivityStormWaterPermitsat(213)576-6684. v" If theprojoctInvolvesa facllltythat is propoSingto dischargeslotm waterassoclatedwith Industrfal activity (c.g., manufacturing,recyclingandtransportationfa<:i1lt1es.etc.).tile tadtity maybe subjecttothe StateBoarCJ'sGeneral IncJvstrfalActivitiesStOtmW"IUfPetmit.ForfurtherInformation.pIea,ocontact KristloChung.StatewideGeneralIndustrialStonnWaterPermitsat(213)576-6807. ./ It theproposedprojectInvoNosrequirementstornewdevelopmentandconstructionpertainitlgto municipal storm wllter prognsm., pleasecontact
•DanRildv1escu.MunicipalStannWatel'Pennits.LosAngolasCOuntyat(213)576-6668; MattYeager,MunicipalStormWaterPermits,VenturaCountyat(213)571Hi749. ./ Theproposedprojectalsoshaq complyv,;thIke locall'e1lulationsassociatadwith tM applicableRaglonal Board stormwlltcr pgnnit
l.s!.s&-g,llMCountyandCo=P(!!!!1itte0$j
NPOeS No. CAS614001
WasteD~chargcRequirementsOrderNo.96-054.

LongBeaC!lCountyand CO=OO!T1tt!!(!Sj
NPOESCAS004003 •
Wastl)OlscnargeReQuirOfTlentsoreerNo.99-060.
'«nlyraCoyntyandCo-oenniIt9~$:

NPOESNO.CASOQ4002 .•
WasteOisdlatgaRequirementsOrderNo.00-108:

I
I
I
I
I
I
I
./ If the proposedproject involvosany constNctionandIorgroundwatM dowatorlng to be dlsehargod to aurfaco waters,theprojectmaybosubject10NPDES,Wasto DlschlltglJRequirements.ForfUrtherinlOnnation.pleasecontact:

AugustineAnijieJo,GeneralPermittSng:JndSpecialProjects Unitat(213)576-6657(AllRegion4WatOlShe<ls)• ./ "If tM proposedprojectinvolvesany construction;and/orgrounct.Yaterdowatorfng to b. discharged to land or groundwatar,theprojectmaybOsubjecttoWastoDischargeRequiremOllts.ForfurtherInformation.pleasocontact:

Kwaog.jlLeo,Non-Chaptor1~Unit,at (~13)~76-6666(AllRegion4Watersheds).I I
Rcvisad :MIIrc;h19.2001
J
] Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration O/{)()$PI".. ("".,""";\'(td«("(ji.,,/}.,I«011:110:/0..:' .ut

Page 6 ends

I
I Letter I:

I
I
I
Comment
Number
I-I
I
I
I
I
I
I
I
I
I
I
I
I
I

6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses Response to Comments from the California Regional Water Quality Control Board LOS AngelesRegion,TMDL Unit
Elizabeth Erickson,Associate Geologist
Response
This comment letter was received after the close of the public comment period, which ended on March 14,2001; however, the County of Los Angeles Department ofParks and Recreation appreciates the comments provided by the Los Angeles Regional Water Quality Control Board (RWQCB). The RWQCB's comments have been reviewed, and the issues discussed are best addressed during the preparation of the permits and plans required for the proposed project, including the National Pollution Discharge Elimination System (NPDES) permit, the Stormwater.Pollution Prevention Plan (SWPPP), and the Standard Urban Stormwater Mitigation Plan'(SUSWMP), which will identify measures and best management practices (BMPs) to reduce impacts to groundwater and water quality. With the implementation of the above plans and BMPs, theproposed project would not impair downstream reaches of the Santa Clara watershed.

The proposed project would contribute little, if any, nutrients, salts, coliform bacteria, andpesticides tothe watershed.

To comply with and implement the NPDES permit, specific BMPs would be required by the County and various regulatory entities. The SWPPP and the SUSWMP, which would be required for the project, would also specify the BMPs to be implemented.

Examples of some general BMPs that would be anticipated for.the project include the following:

Construction
• Scheduleexcavation and grading work for dry weather.
• Use as littlewater as possible for dust control.
• Never hosedown dirty pavement or impermeable surfaces where fluids have spilled; sweep up dry spilled materials immediately; clean up spills on dirt areas by digging up and properly disposing of contaminated soil, and report significant spills to the appropriate spill response agencies immediately.
• Maintain all vehicles and heavy equipment; frequently inspect for leaks. Conduct all vehicle/equipment maintenance and refueling at one location, away from storm drains; perform major maintenance, repair jobs, and vehicle/equipment washing off site;.use drip pans or drop cloths to catch drips and spills, if draining and replacing motor oil, radiator coolant, or other fluids on site; and do not use diesel oil to lubricateequipment or parts.
• Keep construction materials out of the rain. Store both dry and wet materials under cover,protected fromrainfall and runoff. Also protect drymaterials fromthewind.

Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 0100&PlumC""'U'(.MI\"J"'I" I' ""~I !ft('L ()11:J/O: 10:.'$f\1

Page 6 ends

I

I 6.0 Comments Received on the Draft Initial StudylMitigated Negative Declaration and Responses I
I
Letter I:
(Continued)
I
I
Comment
Number
I-I
I
I
I
I
I
I
I
I
I
I
I
I
Response to Comments fromthe California Regional Water Quality Control Board LosAngeles Region,TMDL Unit
Elizabeth Erickson, Associate Geologist
Response
Construction (Continued)
• Secure open bags of cement to keep windblown cement powder away from streets, gutters, storm drains, rainfall and runoff.
• Apply concrete, asphalt, and seal coat during dry weather to prevent contaminants fromcontactng stormwater runoff. .
• Utilize revegetation, if feasible, for erosion control after clearing, grading, or excavating.
• Cover stockpiles and excavated soil with secured tarpsorplastic sheeting. • Remove existing vegetation only when absolutely necessary; consider planting temporary vegetation for erosion control on slopes or where construction is not immediatelyplanned, and plant permanent vegetation as soonas possible.

Operation
• Do not overwater landscaping. Conserve water by using irrigation practices such as drip irrigation, soaker hoses or micro-spray systems.
• Donot blow orrake leaves into the street, gutter, orstormdrains. • Use plant vegetation that is native, non-invasive, drought tolerant, and pest tolerant to minimize chemical and labor use over the shortllong-term; minimum use of pesticides and/or fertilizers would reduce the potential for chemical/nutrient runoff or groundpermeation toaffect the water quality inthearea. • Use organic ornon-toxic fertilizers.
• Do not over-fertilize and donot fertilize near ditches, streamsor other waterbodies. • Storepesticides, fertilizers and other chemicals inacoveredarea to prevent runoff.

The proposed project would involve the development of a local park, which would consist of site utilities and infrastructure, off-street parking, walkways, children's play area, tots play area, restroom building and maintenance area, group picnic shelter, basketball court, tennis court, multi-purpose athletic field. Some of these uses would create new impervious surfaces. As stated on page 3-12 of the Draft ISIMND, the impervious area of the project site would be less than 0.25 acre after project Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration fJ/(J()3 Plu", ('''',,,,. Nrp/ct ((;",/),"« 01 :]10: 10..:.I,UI

Page 6 ends

I 6.0 Comments Received on the Draft Initial Study/Mitigated Negative Declaration and Responses I Letter I:
(Continued)
I
I
I
Comment
Number
1-1
I
I,
I
I
I
I
I
I
I
I
I
I
I
Response to Comments fromthe California Regional Water Quality Control Board Los Angeles Region,TMDL Unit
Elizabeth Erickson, Associate Geologist
Response
development; currently, the site is unpaved, undeveloped, and consists entirely of pervious surface. The remainder of the park would continue to allow subsurface infiltration through the grass lawns and landscaped areas. Therefore, the proposed project is not anticipated to significantly change the amount of surface water runoff, percolation, and groundwater beneath the project site.

The County will coordinate with the RWQCB during the permitting and final design process.

Page 6 ends

I Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 01()()JPI.,. C<ln",nN.g./('('(fln<ll)dO('011:):0] 10..]J ,lIf

I ___ ',~ ....;7..;.;.O;."..;.;.M:.:.It:.:.!lg~a:::tl.:::.:on:....:M:.:.:.:.;on::.:.lt::o.:.:rl::.:.ng~an::d:...:R.;.;e;,.!:,p.;.;ort:.:.:l:.:.:;ng~P:..:r:..;:;o~gr:..;;a.:.:.:.m I
I
SECTION 7.0 MITIGATION MONITORING

ANDREPORTING PROGRAM
I
Public Resources Code, Section 21081.6 (Assembly Bill 3180) requires that mitigation measures identified in environmental review documents prepared in accordance with CEQA are implementedafter a project is approved. Therefore, this Mitigation Monitoring and Reporting Program (MMRP) has been prepared to ensure compliance with the adopted mitigation measures during the final plans and specifications.construction, and operation of thePlum Canyon County Park Project.

I
I
The Los Angeles County Department of Parks and Recreation is the agency responsible for implementation of the six mitigation measures identified in the ISIMND. This MMRP provides the Los Angeles County Department of Parks and Recreation with a convenient mechanism for quickly reviewing all the mitigation measures including the ability to focus on select information such as timing and implementation phase. The MMRP includes the following information:

I
I
• the phase of theproject during which adoption of the mitigation measure should be implemented • the phase of the project during which the implementation of the mitigation measure should be monitored;
I
I
• the enforcement agency; and,
• the monitoring agency.

I
I
I
I
The MMRP also includes a checklist to be used during the mitigation monitoring period. The checklist will verify the name of the monitor, the date of the monitoring activity, and any related remarks for each mitigation measure.

I
I
I
I
I PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclarationOI(JI!,~,.""", ("I1'f\'rJH \N:c/« 1(i"'11).,/0<'OI.f_·J~'O:10._\<UI Page7-1

L.J
-----------7.0 MitigationMonitoringandReportingProgram------TABLE 6

MITIGATION MONITORING AND REPORTING PROGRAM
MitigationMeasure Remarks

BIOLOGICALRESOURCES
M-IV.I: TheCountyshallmitigateimpacts
ro the COFG-jurisdictionaldrainages by
contnbutingtoa mitigationfundthroughthe
paymentofa fcc. Themitigationfundshall
beusedtomitigateoff-site'atanappropriate
preserveselectedbyCOFG.Thefeeshallbe
usedtopurchase0.069acresofmitigationat
theselectedpreserve.

M-IV.2:If disturbanceof suitablenesting
habitat occurs during the nesting season
(February15throughAugust3J), aqualified
biologistshallconducta generalbirdsurvey
within a 300-foot buffer from the limits
ofgradingnomorethan 15dayspriortothe
first ground disturbance to determine if
nestingbirdsarcpresent.Ifnestingbirdsarc
notfoundduringthesurveyonsiteorwithin
300 feet of the limits of grading,
constructionactivitiesmayproceed. During
construction,similar surveys for nesting
birdsshallbe conductedon a weeklybasis
onsiteand'withina300-footbufferfromthe
limitsofconstruction.Ifanestingbirdlisted
as protectedby the MigratoryBird Treaty
Actisobservedonsiteorwithin300feetof
thegradinglimits,allactivitywithin300feet
ofthenestshallbe halteduntilit iscertain
thattheyounghavefledged. Thismeasure
will ensurecompliancewith the Migratory
BirdTreatyAct.

Implementation
I Phase'I
Priorto
construction
activities
Priortoand
duringvegetation
removalof
suitablenesting
habitat
Monitoring
Phase
Duringoff-site
mitigation
Priortoandduring
vegetationremoval
ofsuitablenesting
habitat
Enforcement
Agency
California
Departmentof
FishandGame
California
Departmentof
FishandGame
Monitoring
Agency
California
DepartmentofFish
andGame
CountyofL.A.
(Department
providing
constructioncontract
management)
Initial Date
VerificationofCompliance
PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclarationOl()()$PI"",Ca.yonNtgtIec({_I).doc 0112J10110:2SAM Page7-2

L.J
----------------7.0 MitigationMonitoringandReportingProgram TABLE 6- (Continued)

MITIGATION MONITORING AND REPORTING PROGRAM
. Implementation Monitoring Enforcement I\lonitoring VerificationofCompliance Mitigationl\leasure Phase' Phase Agency Agency Inilial Dale Ht'III:1rks

CULTURALRESOURCES
M-V.l: If previouslyunidentifiedcultural FinalPlansand Duringconstruction California CountyofL.A. resources,includinga potentialfeatureor Specifications activities Native (Department mtactdeposit,are exposedduring ground andduring American providing d.sturbmgconstructionactivities,workshall consnuction Heritage constructioncontract be haltedin that area,and the featurewill activities Commission management) need 10 be assessedfor significanceby a .qualifiedarchaeologist.

NOISE
M-XI.I: Projectconstructionshallcomply FinalPlansand Duringconstruction CountyofL.A. CountyofL.A. withtheCountyofLosAngelesNoiseCode. Specifications activities Sheriff's (Department Constructionactivitiesshallbelimitedtothe Department providing hoursof7:00 a.m,to8:00p.m.onMondays- constructioncontract Fridays; prior written approval shall be management)
obtainedtoconductconstructionactivitieson
Saturdaysbetweenthehoursof7:00a.m.and
8:00 p.m. No constructionshall occuron
Sundaysandlegalholidays.

M-XI.2: All construction. equipment, FinalPlansand Duringconstruction CountyofL.A. CountyofL.A. stationaryand mobile, shall be equipped Specifications activities. Departmentof (Department. with properly operating and maintained PublicWorks, providing mufflingdevices. Buildingand constructioncontract
SafetyDivision management)
M-XI.3:Temporarynoisemufflersandnoise FinalPlansand Duringconstruction -CountyofL.A. CountyofL.A. attenuatingdevices, particularlyalong the Specifications activities. Departmentof (Department northern boundary of the project site PublicWorks, providing adjacent to the single-familyresidences, Buildingand constructioncontract shallbeemployedto reducenoisegenerated SafetyDivision management) duringconstruction.

PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclaration0100$PI"",Cmr>'OIINtgrltc(/iMlJdoc0111J1O!10:1SAM Page7-3

-------------------7.0 MitigationMonitoringandReportingProgram TABLE 6- (Continued)

MITIGATION MONITORING ANDREPORTING PROGRAM
MitigationMeasure

UTILITIESANDSERVICESYSTEMS
M-XVI.I: Priorto completionofplansand
specifications,the Countyof Los Angeles
Departmentof Parks and Recreationshall
includein the finalplansandspecifications
the requirement for the construction
contractorto workwith the Countyof Los
Angeles Department of Parks and
Recreation's recycling coordinator, Mr.

BoydHoran,toensurethatsourcereduction
techniques,procurementofrecycledbuilding
materials,andthedevelopmentof recycling
programsduringconstructionandoperation
of the facility are considered and
implemented whenever possible. The
CountyofLosAngelesDepartmentofParks
andRecreation'srecyclingcoordinatorshall
review the plans and specificationsfor
incorporationofthespecifiedlanguage.The
CountyofLosAngelesDepartmentofParks
and Recreationshall demonstrateto the
satisfactionof the Countyof Los Angeles
Department of Public Works the
incorporationofthisrequirement.

M-XVI.2:Priorto completionofplansand
specifications,the Countyof Los Angeles
Departmentof Parks and Recreationshall
clearlyidentifybinenclosuresandrecycling
containers,inaccordancewiththeCalifornia
SolidWasteReuseand RecycleAccessAct
of 1991,as amended. The Countyof Los
AngelesDepartmentofParksandRecreation
shalldemonstrateto the satisfactionof the
CountyofLosAngelesDepartmentofPublic
workstheincorporationofthisrequirement.

Implementation Monitoring Enforcement Monitoring VerificationofCompliance Phase' Phase Agency Agency Initial Date Remarks
FinalPlansand Duringpark CountyofL.A. CountyofL.A.

Specifications constructionand Departmentof DepartmentofPublic operation PublicWorks Works
FinalPlansand
Specifications
Duringpark
constructionand
operation
CountyofL.A.

Departmentof
PublicWorks
CountyofL.A.

DepartmentofPublic
Works
PlumCanyonCountyPark ProjectFinalInitialStudy/MitigatedNegativeDeclaration01O/MPIIIIIIC4nyollNtgJ«(/,WJI).doc0111]10110:1SAM Page7-4

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

APPENDIX A

VISTA INFORMATION SOLUTIONS

SITE ASSESSMENT PLUS REPORT
(HAZARDOUS MATERIALSIWASTE SITES)
-~ ---------------Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration I)/I~!~/'1,,,. ( "., .." N(."I...·tnl"'/~,I,~"1/1(/:11)//II .11,1/

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

SITEASSESSMENTPLUSREPORT

PROPERTY CLIENT

INFORMATION INFORMATION
Project Name/Ref #:01008 EricWilson
PlumCanyon Park KEAEnvironmental
28222N.Via Joyce Road 250S.Grand Avenue #3920A
Saugus,CA 91350 LosAngeles, CA 91016
CrossStreet: PlumCanyon Road
la'tltude/LonQltude: (34.449085, 118.489896)
.Site Distribution Summary within 1/8 1/810 11410 11210 milo 114mI/o 112mI/o 1milo
Agency I Database - Type of Records
A) Databases searched to 1mile:

USEPA NPL National PriorityList 0 0 0 0
USEPA CORRACTS RCRACorrective Actions 0 0 0 0
STATE SPL State egulvalent Qrloritylist 0 0 0 0
B)Databases searched to 1/2 mile:

STATE SCL State egulvalent CERCUSlist 0 0 0 -USEPA CERCLIS/ Sitescurrently or formerly under review NFRAP b~USEPA 0 0 0 -USEPA TSD RCRApermitted treatment, storage, dlsQosalfacilities 0 0 0 -STATEREG LUST Leaking Underground Storage Tanks CO 0 0 0 -STATE/ SWLF Permitted assolidwaste landfills, REG/CO Incinerators. or transfer stations 0 0 0 -STATE DEEDRSTR Siteswith deed restrictions 0 0 0 -STATE CORTESE State lnqex of properties with hazardous waste 0 0 0 -STATE TOXICPITS Toxic PitscleanuQ facilities 0 0 0 -USGS/STATEWATER Federal and State DrinkingWater WELLS Sources 0 0 0 -STATE SPILLS State sQflislist 0 0 0 - Formore Information call VISTAInformation Solutions.Inc. at 1- 800 - 767- 0403.

Report ID:723401901 Date of Report: November 13,2000
Vers/on2.7 Poge#l

I
SiteDistributionSummary within 118 118to 114to 112to
milo 114mHo 112mHo 1mHo
Agenc'( / Database - Typeof Records
C) Databases searched to 1/4mile:

USEPA RCRAVlol RCRAviolations/enforcement actions 0 0 - -USEPA TRIS ToxicRelease Invento!y database 0 0 - -STATE UST/AST Registered underground or aboveground storage tanks 0 0 - -COUNty UNIQUECO Unigue county databases 0 0 - - D)Databases searched to 1/8mile:

USEPA ERNS Emergency ResponseNotification
Systemof sQllls 0 - - -USEPA GNRTR RCRAregistered smallor large generators of hazardous waste 0 - - -
Thisreport meets tl'le ASTMstandard E-1527for standard federal and state government database research Ina PhaseIenvironmental siteassessment. A (-) indicates a distance not searched because it exceeds these ASTMsearch parameters. .

UMITATIONOFUABIUTY
Customorprocoods at Itsown riskInchoosing to relyonVISTAsorvlces,Inwhole or Inpart. priortoprocoodlng withany transacHon. VISTA cannot be an Insureroftho accuracy oftho Information.orrol'$occurring Inconversionofdata. orforcustomor'susoofdata. VISTAand Its affiliated companlos. offlcors.agonts.omployees and Indepondont contractors cannot bo hold liable foraccuracy. storage. delivery. loss orexpensosufferodbv customerrosulHnadlrectlv orIndirectlYfromany Informationcrovldod bv VISTA• .NOTES
.

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Formore informaHon call VISTAInformaHon Solutions.Inc. at 1-800-767 - 0403.

Report 10:723401901 Date of Report: November 13,2000
Version2.7 Page #2·
I
I

I I
.I
I
I I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

SITE ASSESSMENT PLUS REPORT
Map of Sites within One Mile
.I
I
I

0.25 0.5
Miles

A B C D
1mi. 1/2mi. 1/4 mi. 1/8mi.
• lID D 0
+ 6 0
o::>o
.'....-...

Subject Site

RCRA VIOL,

TRIS, UST
ERNS,

GENERATORS
*
Category:.

Databases Searched to:

Single Sites
Multiple Sites
.-.._
..' Rivers or Water Bodies
, Utilities
CERCLlS\
NFRAP,
TSD, lUST,
SWlF, SCl
Ifadditional databases are listed in the cover page of the report they are also displayed on this map. The map symbol used corresponds tothe database category letter A,B,C,D.

NPl, SPL,

CORRACTS
(TSD)
Highways and Major Roads
Roads
Railroads
For More Information Call VISTA Information Solutions, Inc. at 1 •800 - 767 - 0403 Report 10:723401901 Date of Report: November 13, 2000
Page #3

Street Map

SITE ASSESSMENT PLUS REPORT
.•I
I
I
Miles.I .
~
Highways and Major Roads
Roads
Railroads
Rivers or Water Bodies
Utilities
Subject Site
* ,_.

I
I
I
I
I
I
I
I
I
I

0.5 I
I
I
I
I
I
IFor More Information Call VISTA Information Solutions, Inc. at 1 - 800 - 767 - 0403 Report 10:723401901 Date of Report: November 13, 2000 IPage #4

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

SITEASSESSMENTPLUSREPORT

SITEINVENTORY

A B C D
PROPERlYANDTHEADJACENTAREA c.

MAP (within 1/8 mile) ~ ~
~
u.. _. _, 010 z ~ ~ ;: 0 0U;- w ii: s ~~
w::l 0:: 0 0::
s ~VISTAID 0:: 0 t;
~
o
~
~
~ ~ en
DISTANCE_.
8_. _. 0:: C w
8 _. en ;::::Z z Za.. a.. U w
3 w c::0 1=en 0::

DIRECTIONZ en en 0 ~ c ::::en 0:: :l :l w (!)
.No Records Found
.

A , B C 0
SITESINTHESURROUNDINGAREA a..-eMAP (within 1/8 - 1/4 mile) 0:: ~u.. 010 0 z ~ _. _,
U;- ~
w ;: Q 0
-e en a.. > ~
w::l
~ 0 0::
~ ~VISTAID 0:: 0 ~ o ~ ~ ~ en0:: t;
~

DISTANCE
_.
8_, _. 0:: C w
8 en ;::::Z z Za.. a.. 0 w 3 :: w D: U 1=en 0::

DIRECTIONZ en en 0 ~ en C ::::en 0:: :l :l LU (!)
No Records Found
A B C 0
SITESINTHESURROUNDINGAREA a..-eMAP (within 1/4 - 1/2 mile) 0:: ~u.. 8 ~
z ~
_. _.10 U;-
:t ~
w ;: 0
~
a.. :> t; w::l 0 0:: :l
~VISTAID 0:: U Ii;
~
c
~
~ ~ ~ sClI en

DISTANCE
_.
8_. _. 0:: C w
8 en t; Z z Za.. U w D: U t=a.. U J2 3 LU
:::: 0:: (!)DIRECTIONZ en en C en 0:: :l :l w
No RecordsFound
••{
, A B C 0
SITESINTHESURROUNDINGAREA a..

MAP (within 1/2 - 1mile) ~ ;}u.. 010 0 z ~
_,
U;- ~
w ;: 0 0
~ ~
a.. :> ~
w::; 0 0::
a 0::

VISTAID U ~ C w ;} ~ en Ii_. 0:: _. 0:: t; X < en ~ ZDISTANCE 8_. c w
8 z za.. 0 LU
~ W
e D: U sa.. U J2 3 :::: 0:: (!)DIRECTIONZ en en C en 0:: :l :l w No Records Found
x=search criteria; •=tag-along (beyond search criteria).

Formore information call VISTAInformation Solutions.Inc. at 1- 800 -767 - 0403.

Report ID:723401901 Date of Report: November 13,2000
Vemon2.7 PogeHS

A B C D
Q..

UNMAPPEDSITES -e ~IXu-
8 ~
z (g .... ....
u; ~ w 3: 0(I) Q.. s: t; w::i IX
~ 0 IX
a fiIX 0 t; ~ 0
~
~
;gs ~ (I)
....8........IX 0 :::w
8 0 (I)
t; z ZQ.. Q.. 0 w
3 .~ a: ~ z ~VISTA10 Z (I) (I) 0 ~ (I) :::'(I) IX ::::I '::::I w (.!) PACIFICBELLSAGSCA11KC575 65134355
20660PLUMCANYON RD X
SANTACLARITA.CA 91350
EXXONCO USA 65143197
27716VIOLINCANYON RD X
CASTAIC.CA 91310 .

CASTAICSPORTSCOMPLEX- LACO 65147270
31230CASTAICRD X
CASTAIC.CA 91310
USDAFORESTSERVLOSALMOSSTA 65125533
OT7N-R18W-SEC17 X
CASTAIC.CA 91310
HANCOCKOILCO 65141315
oCASTAICHILLSOLFD X
CASTAIC.CA 91310
RUDCOFABRICATION 65131989
24930AVETIBBITTS X
SANTACLARITA.CA 0
ARCO PETROLEUMPRODUCTSDISTR .651saJ83
27242HENRYMAYO DR X
SANTACLARITA.CA 0
USORGANICSYSTEM/KINGDISPOSALINC~180231
22925NORTHCOLTRANESTREET X
SANTACLARITA.CA 0
BURNETTPROPERTY 6564SJO

WARWITHRD X
SANTACLARITA.CA 91350
T D ELECTRIC 65127968
16529SIERRAHWY X
SANTACLARITA.CA 0
EXXONCOUSA 65143230
27101SAUGUS-VENRD X
SANTACLARITA.CA 0
CASTAICMIDDLESCHOOL . 65147268
28300HILLCRESTPKWY X
CASTAIC.CA 91310
GLASSCRAFTCO 65142188
26101MAGIC MOUNTAINPKWY X
SANTACLARITA.CA 0
CHARLIECANYON 65146786
oCASTAIC X
CASTAIC.CA 91310
CHARLIESMOBILE 65146788
16411DELONERD X
SANTACLARITA.CA 0
I
I
I
I
I
I
I
x=search criteria; •=tag-along (beyond search criteria).

Formore information call VISTAInformation Solutions.Inc. at 1- 800- 767- 0403.

Report ID:723401901 Date of Report: November 13,2000
Vef$/on2.7 Pog9#6
I
I
I
I
I
I
I
I
I,
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

A B C D
0-
UNMAPPEDSITES <~ ~en u.. .... .... 0
g z e: ~ ;: 0 U. ;;;- w
~
~
0- s ~
w:::l U ~
~ ~~ ~ 0 w ~ ~ ene::: Ii;
9<...I
0 ...I ...I 0
~
w
8 _, en ti z z Z0- 0- U w 3 w ii: U ;g e:::VISTAfD Z U en en 0 ~ 0 :::(I) ~ ::J ::J w (!) NEWHALLLAND FARMINGCO 65135218
28769CASTAICCANYON RD X
CASTAIC.CA 91310
TEXACOEXPLORATIONPROD 651279S6
oHONORRANCHOLFD X
CASTAIC.CA 91310
TEXACOTRADINGAND TRANSPORT 65127753
24000GOLDENSTATEHWY X
CASTAIC.CA 91310
SULPHURSPRINGSMAINTDEPTE 65128S27
16400SIERRAHWY X
SANTACLARITA.CA 0
REPUBLICSHEETMETALWORKS 65132716
16385SIERRAHWY X
SANTACLARITA.CA 0
LONGBEACHOILDEVELOPMENTCOM 65137415
oCASTAICHILLSOLFD X
CASTAIC.CA 91310
AUTONMOTORIZEDSYSTEMS 65149331
28220CROCKERAVE X
SANTACLARITA.CA 0
VALENCIATECHNICALSYSTEMS 6512S3S8
24730AVETIBBITTS X
SANTACLARITA.CA 0
SIERRABLOCK 65129875
16970SIERRAHWY X
SANTACLARITA.CA 0
99CUT·COVER 65122302
oCASTAIC X
CASTAIC.CA 91310
DELTADIRECTACCESS 65144846
27460SCOTTAVE X
SANTACLARITA.CA 0
SOLARTRUCKING 65129751
30315ROMEROCANYON RD X
SANTACLARITA.CA 0
TEXACOINCABSORPTIONCO 65127S65
oCASTAICHILLSOLFD X
CASTAIC.CA 91310
TEXACOINCGASPLANT 65127S66
23900THEOLDRD X
CASTAIC.CA 91310
PWGILLIBRANDCO 65133365
13900LANGSTATIONRD X
SANTACLARITA.CA 91350
X =search criteria; •=tag-along (beyond search criteria).

Formore information call VISTAInformation Solutions.Inc. at 1- 800 - 767- 0403.

Report ID:723401901 Date of Report: November 13,2000
Version2 7 Page #7

I . A B C D

0..
-eUNMAPPEDSITES 0:
~u-
S
~
s ~ .....
~
w ~ 0en c:: :> Ii; w::;
~ 0 0:
a ~0: 0 t; ~ c
~
~ ~ 5- s en. .....

S..........0: C w 0 en Iii z za.. a.. 0 w
3 ~ w c:: ~ Z 0:

VlSTAIO Z en en 0 ~ c 0 ==en IX ~ :::l w (!)
TEXACOINC INJWELLS 65121661
oHONORRANCHOLFD X
CASTAIC.CA 91310
STANDARDOILCO 65128631
oCASTAICHILLSOLFD X
CASTAIC.CA 91310
CROWNCENTRALPETROCORP 65145120
oTAPIACANYON OLFD X
CASTAIC.CA 91310 .

RAMENTERPRISESINC 65132866
24940AVETIBBITTS X
SANTACLARITACA 0
SAMENTERPRISESINC 65131144
oTAPIACANYON OLFD X
CASTAIC.CA 91310
NORWALKPROPERTIES 4044206
T5NR1RW525R1RW525 X
SANTACLARITACA 91350
CLAYTONVALLEYAUTOREPAIR 65145968
28930SAMPL X
SANTACLARITACA 0
PAIR-A-SCOPE 65134494
26101MAGIC MOUNTAINPKWY X
SANTACLARITACA 0
CAROLESIRONWORKS 65141152
19646BARINGTONST X
SANTACLARITACA 0
GOODYEARINDUSTRIALPRODUCTS 65142026
27201TORUNEYRD X
SANTACLARITACA 0
VINTAGEPETROLEUMINC 65125239
oHONORRANCHOLFD X
CASTAIC.CA 91310
VINTAGEPETROLEUMHONORRANCHO 65125238 .
24000GOLDENSTATEHWY X
CASTAIC.CA 91310
EMCOFLUIDSYSTEMS 65143661
24910AVETIBBITTS X
SANTACLARITACA 0
HONORRANCHOOILFIELD 65140684
oCASTAICHILLSOLFD X
CASTAIC.CA 91310
DOUGLASOILCO 65144410
oHONORRANCHOLFD X
CASTAIC.CA 91310
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
X =search criteria; •=tag-along (beyond search criteria).

Formore information call VISTAInformation Solutions.Inc. at 1·800·767·0403.

Report ID:723401901 Date of Report: November 13.2000
Ve~/on:],1 Page#8
I
I
'I
I

I
I
I
I
I
I
i·1
I
I
I
I
I
I
I
I
I
I
I
I
A 8 C D

0..

UNMAPPEDSITES «0: ~u.. 0" G z ~
_, _,
Ui' ~ w ~ 0 0
~
V) c::: s ~
w::i 0:
~ 0 0: ~
~0 !!l c w ~ ~ o V)0: t;
~
~_, 0 _,_, 0: C ;: w 0
_, V)
ti z z Z0.. 0.. 0 w
3 w c:::0 s 0:

VISTAIDZ 0 V) V) 0 ~ V) c 0 ;: V) 0: ~ ~ w o
SANTACLARITAWATERCO 65131S07
21110GOLDENTRIANGLERD X
SANTACLARITACA 91380
CAPA INDUSTRIES 65147407
24927AVETIBBITTS X
SANTACLARITACA 0
AM-CAL INDUSTRIESINC 651S07OS
oTAPIACANYON OLFD X
CASTAIC.CA 91310
, PROFOUNDAUTODETAILING 65133251
18122FLYNNDR X
SANTACLARITACA 0
MYERSTRANSMISSION 65135339
27538OAKSPRINGCANYON RD X
SANTACLARITACA 0
KOBITIRECENTER 65138960
27134SIERRAAVE X
SANTACLARITACA 0
FRANMARMFGINC 65142714
24927AVETIBBITIS X
SANTACLARITACA 0
RAINBOWGLENNDEVELOPMENT 7291888

RAINBOWGLENN X
CANYONCOUNTRY.CA 91351
SEE1-970 65130676
oCASTAICHILLSOLFD X
CASTAIC.CA 91310
NORTHFORK# 7434647
T4NR13W33 X
SANTACLARITACA 91350
LACO FDFIRESTA077 65138699
47376RIDGEROUTERD X
CASTAIC.CA 91310
IMAGEFACTOR 65140564
24927AVETIBBITIS X
SANTACLARITACA 0
76PRODUCTSSTATION#6499 7434389
28529SANDCNYN X
CANYONCOUNTRY.CA 91351
DEPARTMENTOFWATERRESOU 7429791
31849LAKEHUGES X
CASTAIC.CA 91310
MIKEBARRETTCOTR4496637081 65136365
oPLUMCANYONRD X
SANTACLARITACA 0
X =search criteria; •=tag-along (beyond search criteria).

Formore Information call VISTAInformation Solutions.Inc. at 1- 800 - 767- 0403.

Report ID:723401901 Date of Report: November 13,2000
veston 2.7 Page #9

. A B C D
Q.. '.-e ~UNMAPPEDSITES 0:u. 0
~
z ~
_. _.
;;; ~
w ~ 0 0en Q..
s ~
w=:i
~ 0 0:
~ ~ ~0: 0 I-
~
Q
~
!i ~ ~
en_.
8_,_. 0: Q ·en w 0 en Z Z ZQ.. Q.. 0 W
~ 3 w ~ a:::.~ e: 0:

VISTA10 Z en en 0 Q 0 en :;:) :;:) w (!)
SWANSONMECHANICAL 65128356
16515CANYON LN X
SANTACLARITA.CA 0
RAINBOWOHARAPUBLICATION 65133176
24715AVEROCKEFELLER X
SANTACLARITA.CA 91380
RAINBOWOHARAPUBLICATIONS 65133177
24715AVEROCKEFELLER X
SANTACLARITA.CA 91380
SWANSONDUMP 65128355 .
oCASTAIC X
CASTAIC.CA 91310
ATLANTICOILCO 65149546
oCASTAICHILLSOLFD X
CASTAIC.CA 91310
PETROMINERALSCORP 65133849
oCASTAICHILLSOLFD X
CASTAIC.CA 91310
PETROMINERALSCORP230 65133851
oTAPIACANYON OLFD X
CASTAIC.CA 91310
JACASLAOILCORP 65140238
oCASTAICHILLSOlFD X
CASTAIC,CA 91310
FAA-RMLRQSS 65143303

HI-VISTA X
CASTAIC.CA 91310
. PETESAUTOELECTRIC 65133818
16280SIERRAHWY X
SANTACLARITA.CA 0
UNIONOil COMPANY 7432070

DELVALLEOILFIELD X
SANTACLARITA.CA 91350
BILLSMALL'SMUDSUMP 65180346

ATENDOFAVENUEOFTHEOAKS X
SANTACLARITA.CA 0
CASTAICCLAYMANUFACTURIN 7433728
3230OLDRIDGERT X
CASTAIC.CA 91310
TAYLORSIMPORTAUTOSERVICE 65127789 .26044TOURELLAPL X
SANTACLARITA.CA'O
,
VALVERDEWATERDIST 65125721
30000SANMARTINEZRD X
SANTACLARITA.CA 91350 .
x=search criteria; •=tag-along (beyond search criteria).

Formore information call VISTAInformation Solutions,Inc. at 1- 800-767 - 0403.

Report ID:723401901 Date of Report: November 13,2000
VersIon2.7 Poge#10
I
I
I
I
I
I
I
I
I
'I
I
I
I
I
.1
I
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~

A B C D

0..

UNMAPPEDSITES ~ ~
f1 u. _, _, 0z ~ (g ~ 0 0
~
;;; w
~

0.. :> ~
w::i IX 0 IX ~ IX
0 ~ 0
~
~ -e G U)t-
_, IX _, IX t; w
e _, IX U)t:::- ZIX
8_, 0
8 z0.. 0.. 0 w
3 ~ w c:::0 -U) IXZ
VJSTAIDZ U) U) 0 f1 0 :s:U) IX :=~::J w(.!)
HASAPRODUCTSCO INC 65141051
25950SPRINGBROOKAVE X
SANTACLARITA.CA 91350
USDAFORESTREDMOUNTAINSTA 6512S528
oT6N-R16W-S34NE14 X
SANTACLARITA.CA 91350
VALLEYSTOCKRANCH 65125411
HASKELlCYN X
SANTACLARITA.CA 91350
VASQUEZCANYON DUMP 65125470
oVASQUEZCYNRD. X
SANTACLARITA.CA 91350
NUEVOENERGYCOMPANY 6513SOS9
oDELVALLEOLFD X
SANTACLARITA.CA 91350
OAKCANYON OILFIELD 65135089
oOAKCANYON OLFD X
SANTACLARITA.CA 91350
UNIONOILCOMPANY/UNOCAL STATION13567756

DELVALLEOILFIELD X
SANTACLARITA.CA 91350
NEWHALLLAND FARMINGCO 65135214
27671CHIQUITOCANYON RD X
SANTACLARITA.CA 91350
UNOCALCORPORATION 651257P2
oDELVALLEOLFD X
SANTACLARITA.CA 91350
VALENCIASHELL 65125357
24301VALENCIABLVD X
SANTACLARITA.CA 91350
HASLEYCYNOILFIELD 65141055
29007HASLEYCANYON RD X
SANTACLARITA.CA 91350
HOWARD PATRICIAJACKSON 65140722
9115YUCAHILLSRD X
SANTACLARITA.CA 91350
VINTAGEPETROLEUM 65125237
oDELVALLEOLFD X
SANTACLARITA.CA 91350
MOERUSSELL 6513S7PO

BOUQUETCYN X
SANTACLARITA.CA 91350
AGUA DULCEHYDROGEOLOGICINVESTIG'~l~ XSANTACLARITA.CA 91350 NEWHALLTIRE 65135241 ,
24203SANFERNANDORD X
SANTACLARITA.CA 91350
X =search criteria; •=tag-along (beyond search criteria), Formore information call VISTAInformation Solutions.Inc. at 1- 800 - 767- 0403.

Report ID:723401901 Dote of Report: November 13,2000
verstco2,,7 Page #11

I. A B C D
Q.

UNMAPPEDSITES ~ ~u-
Sl3 z ~
_, _,
~ ~
w ~ 0
~ ~
Q. :> Ii; w::i 0 ~
~ .~~ 0 Ii;
~
Q
X ~ ~ ~ -c en_, 0 _,_, ~ Q w 0 en ~ Z ZQ. .Q. 0 W
3 w
~ ii: 0 f! z ~VISTA10 Z 0 en en 0 f2 Q 0 :: en ~ ~ :l w (!) WESTERNDISCOVERYUSA 65124268
oOAKCANYONOLFD X
SANTACLARITA.CA 91350
DECALTAINTERNATIONALCORP 65144767
30617THEOLDRD X
SANTACLARITA.CA 91350
MOERUSSELL 65135791

PLUMCANYON X
SANTACLARITA.CA 91350
MOJAVETUNGSTENREFCO 65/3S8OJ
LANG X
SANTACLARITA.CA 91350
HERLEY-KELLEYOILCO 65/4/175
oDELVALLEOLFD X
SANTACLARITA.CA 91350
TRIANGLEROCKPRODUCT 65126594
13500LANGSTATIONRD . X
SANTACLARITA.CA 91350
HATHAWAYCOMPANY 65141061
oOAKCANYONOLFD X
SANTACLARITA.CA 91350
ACTONREHABILITATIONCrR 65151224
29304ARRASTRECANYON RD X
SANTACLARITA.CA 91350
THETERMOCO 65127544
oOAKCANYONOLFD X
SANTACLARITA.CA 91350
TRIANGLEROCKPRODUCTS 65126595
13900LANGSTATIONRD . X
SANTACLARITA.CA 91350
FRIENDLYVALLEYCOMM CrR 65142786
26501SIERRAHWY X
SANTACLARITA.CA 91350
DELVALLEOILFIELD 65144823
oDELVALLEOLFD X
SANTACLARITA.CA 91350
DEPTWPNUCLEARPLANT 65144526

SANFRANCCYRD X
SANTACLARITA.CA 91350
THOMPSONOILCOMPANY 65127191
oRAMONAOILFIELD X
SANTACLARITA.CA 91350 .

TIDEWATEROILCO 65127315

SANFRANCCY X
SANTACLARITA.CA 91350
I
I
I
I
I
I
I
I
I
I
I
I
Ii
I
I
I
x=search criteria; •=tag-along (beyond search criteria).

Formore information call VISTAInformation Solutions.Inc. at 1- 800- 767- 0403.

Report 10:723401901 Date of Report: November 13,2000
Version:!] Page #12
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

I A , B C D
0-
UNMAPPEDSITES -ca:: ~VI LL. _, _, 0
U z ti ~ ~ 0 0u; w
< VI 0- :> ~
w::l a::
~ 0 a::
s Sa:: 0 !!Ic ~ ~ ~ VIa:: t;
~
_,
8_, .....I a:: C w 0 VI
~ Z Z0- 0- 0 w
3 ==w 0:: 0 fB a:: Z
VISTA10 Z VI VI 0 J!! VI c 0 ==VI a:: ::;) ;:) w (.!)
CURTISCONSTRUCTIONCO 6514S200
12101SOLEDADCANYON RD X
SANTACLARITA.CA 91350
HI-EXCORPORATION 65141233

PLUMCANYON X
SANTACLARITA.CA 91350
CURTISCONSTRUCTIONCO 6514S201
14320SOLEDADCANYON RD X
SANTACLARITA.CA 91350
CURTISSAND GRAVEL 65145204
14320SOLEDADCANYON RD X
SANTACLARITA.CA 91350
CLOUGHERTYPACKINGCO 65145999

BOUQUETCYN X
SANTACLARITA.CA 91350
DIXIEDIESELTRUCKSTOP 65144321
29471THEOLDRD X
SANTACLARITA.CA 91350
SWEETWATERAGGREGATES 65128362
14212LANGSTATIONRD X
SANTACLARITA.CA 91350
SOLEDADCANYON OPERATIONS 65129156
13900LANGSTATIONRD X
SANTACLARITA.CA 91350
SUPERIOROILCO 65128215
oDELVALLEOLFD I X
SANTACLARITA.CA 91350
TIREPROSTOWN COUNTRY 65126963
24203SANFERNANDORD X
SANTACLARITA.CA 91350
ARGENTCORP 65149686
oAGUA DULACR X
SANTACLARITA.CA 91350
DOWNEYLANDLIMITED . 65144143
oCHARLIECANYON OLFD X
SANTACLARITA.CA 91350
MCFARLANDENERGYINC 65136441
oRAMONAOILFIELD X
SANTACLARITA.CA 91350
SHELLOIL204-8066-0214 65130133
24301VALENCIABLVD X
SANTACLARITA.CA 91350
SEE1-742 651306S4
oDELVALLEOLFD X
SANTACLARITA.CA 91350
X =search criteria; •=tag-along (beyond search criteria).

Formore Information call VISTAInformation Solutions,Inc. at 1- 800-767 - 0403.

Report ID:723401901 Dote of Report: November 13,2000
Version2,r poge#13

x=search criteria; •=tag-along (beyond search criteria).

Formore information call VISTAInformation Solutions.Inc. at 1- 800- 767- 0403.

Report ID:723401901 Date of Report: November 13,2000
Version2.1 poge#l4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
. A B C D
Q..
< ~UNMAPPEDSITES ~u.. 0
13 z ~
_. _,
(i;'
~
w ~ 0 0. s ~
Q..
s ~
w:::::i 0 ~
~ ~0:: 0 t; ~ 0
~
~ ;} ~ ~
en_,
8_,_, ~ 0 w
8 en Z ZQ.. 0 W
~ w a::0 e: zQ..

J!!3 ::: 0:: ~VISTAIDZ en en 0 0 en ~ ~ ;:) w
SEE1-10092 65131016
23747MAGIC MOUNTAINP'I0IN X
SANTACLARITA.CA 91350
SEE1-13695 65131054
37000ClEARCREEKRD X
SANTACLARITA.CA 91350
TORCHOPERATINGCOMPANY 65121109
oDELVAllE OLFD X
SANTACLARITA.CA 91350
PWGllllBRAND CO 65133300
13900LANGSTATIONRD X
SANTACLARITA.CA 91350
CASTAICLAKEWATERAGENCY 65141200
32700LAKEHUGHESRD X
SANTACLARITA.CA 91350
LUSTGARTENOILCO 65131233

BOUQUETCYN X
SANTACLARITA.CA 91350
PWGllllBRAND CO 65133364
13500LANGSTATIONRD X
SANTACLARITA.CA 91350
lYONSC J HOG RANCH 65131211

BOUQUETCYN X
SANTACLARITA.CA 91350
SANTAFEENERGYCO 65131521
oDELVALLEOLFD X
SANTACLARITA.CA 91350
PETROMINERALSCORP 65l338SO
29007HASLEYCANYON RD X
SANTACLARITA.CA 91350
LONGBEACHOILDEVELOPMENTCO 65131414
29007HASLEYCANYON RD X
SANTACLARITA.CA 91350
LACO FDCAMP 011 65138035
8800SOLEDADCANYON RD X
SANTACLARITA.CA 91350 .LA CITYDWP- POWERPLANT1 65139093 37000ClEARCREEKRD X
SANTACLARITA.CA 91350
BOUQUETCYNOILFIELD 65148391

BOUQUETCYNOF X
SANTACLARITA.CA 91350
BOSKOVICHFARMSINC 65148300
27700AVESCOTT X
SANTACLARITA.CA 91350

I
I
I
I
I
I
I
I
I
,I
I
I
I
I
I
I
I

A B C D
a..

UNMAPPEDSITES -c0: !!3
~
u.. _, _, 0z
~
~ ~ 0 UUi' w
~
c::: s ~
w:J U 0:
~ fi0: U t; ~ Q
~
~
!!3~ V)_, 0 _, _, 0: Q w
8 _, V) ;:::- z Za.. a.. U w
:3 ~ w c::o ~ V) Z 0:

VISTAID Z U V) V) o ~ c ==V) 0: :::::I :::::I w (.!)
BONELLISEWAGETRPLANT 65148340

BOUQUETCYNRD X
SANTACLARITA.CA 91350
BENTLEYSIMONSONPARTNERSHIP 65148707
oDELVALLEOLFD X
SANTACLARITA.CA 91350
LACO DPWFLOODPACOIMA DAM 65138890
15530PACOIMA CYNRD X
SANTACLARITA.CA 91350
LACO ACTONREHABCENTER 65138839
29304ARRASTRECANYON RD X
SANTACLARITA.CA 91350
GREENVALLEYDUMP 65141809
oSANFRANCISQUITOCYNRD X
SANTACLARITA.CA 91350
LBTHINC 65137803
oDELVALLEOLFD X
SANTACLARITA.CA 91350
GOLDENTRIANGLEINDLPARK 65141964

HONBYSTATION X
SANTACLARITA.CA 91350
LANGSTATION 65138106
14320SOLEDADCANYON RD X
SANTACLARITA.CA 91350
X =search criteria; •=tag-along (beyond search criteria).

Formore information call VISTAInformation Solutions.Inc. at 1- 800-767 - 0403.

Report ID:723401901 Date of Report: November 13.2000
VersIon2.7 poge#15

DETAILS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I·
I
I
II

SITEASSESSMENTPLUSREPORT
No Records Found
PROPERTYAND THEADJACENT AREA (within 1/8 mile)
No Records Found ", .

SITESIN THESURROUNDING AREA (within 1/8 - 1/4 mile)
No Records Found
SITESIN THESURROUNDING AREA (within 1/4 - 1/2 mile)
No Records Found
SITESIN THESURROUNDING AREA (within 1/2 - 1mile)
•VISTAaddress Includes enhanced city and ZIP.

For more information call VISTAInformation Solutions. Inc. at 1- 800 - 767 - 0403.

Report 10:723401901 Date of Report: November 13, 2000
Verslon:?1 Pog9#16

I
I
I

UNMAPPEDSITES
VISTA USORGANICSYSTEM/KINGDISPOSAL,INC.

Address': 22925NORTHCOLTRANESTREET
SANTACLARITA,CA0
VISTAID#: 65180231
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ISTATESWLF- SolidWaste Landfill I SRC#163 Acencv lo: 19-AA-5608 Agency Address: SAMeASABOVe
SWIS#: 19·M-50OS
Name:

Location:
,Place:

County:

Latitude:

Longitude:

Operator:

Op Phone:

Op Address:

Op City:

Op state:

OpZip:

Waste:

Surrounding Land:

PermitThruPut:

PermiHedCapacity:

PermitTotalAcreage:

SWIS#:

Activity:

Operator Status:

Regulatory Status:

Inspection Freq:

SWIS#:

Activity:

Operator Status:

Regulatory Status:

Inspection Freq:

USORGANICSYSTeM/KINGDISPOSAl.INC.
22925NORTHCOLTRANeSTReeT

SANTACLARITA
LOSANGeLCS

34.38333
-118.55
USORGANICSSYSTeMS/KINGDISPOSALINC.
8187685464
22925NORTHCOLTRANesr.

SANTACLARITA.

CA
91355
GReeNMATeRIALS
AGRICULTURAl:OPeNSPACe:COMMeRCIAL
2WCUBIC YARDS
t)<)SOCUBICYARDS

5.W
19·M-5008
LARGeVOLUMeTRANSFeR/PROCFACIUTY

PLANNED

PROPOSCD
NONe
19·M-5008
COMPOSTINGOPeRATION(GReeNWASTe)
CLOSeD

NOTIFICATION
NONe
SWIS#:

Owner:

Ow Addr:

Ow City:

Ow State:
19·M-5008
SAFeHARBORINVeSTMeNTSINC.
8405PeRSHINGDR.,SUITe301
MARINADeLReY
CA
RFIDo16(I).RFIAmend Do1e(I),Actual ThruPul(I). Actual Copac/Iy(I) Actual TotalAcreoge(I), PermitDIsposalAcreoge(l). Actual DisposalAcreoge(l). Ow Phone(l). OwZi!:>r1)
FieldsNot Reported by the Source
Agency for thisSite:
•VISTAaddress includes enhanced city and ZIP.

Formore information call VISTAInformation Solutions,Inc. at 1- 800 - 767- 0403.

Report 1(;):723401901 Date of Report: November 13,2000
Vef$/on2,7 poge#17

UNMAPPEDSITESCONT.

II
IVISTA RAINBOWGLENNDEVELOPMENT VISTA10#: 7291888
Address": RAINBOWGLENN
CANYONCOUNTRY,CA 91351
IStateSpills! SRC#107 EPA/Aoency 10: N/A
Agency Address: SAM£ASABOVE'
Facility 10: 76
Remediation Status: NOFURTH£RACTIONREQUIRED
I
VISTA BILLSMALL'SMUDSUMP VISTA10#: 65180346
Address': ATENDOFAVENUEOFTHEOAKS ' ,
SANTACLARITACA 0
ISTATESWLF- SolidWaste Landfill! SRC#163 Acencv D: 19-AA-5364 Agency Address: SAM£ASABOVE'
SWIS#: . 19-M-5J04
Name: BILLSMALLSMUDSUMP
Location: ATENDOFAV£NU£OFTHEOAKS
Place: SANTACLARITA
County: LOSANGELES
Latitude: 0
Longitude: 0 ,
SWIS#: 19-M-5J04
Activity: SOUDWASTeDISPOSALSITe
Operator Status: CLOSED
Regulatory Status: PRE-REGULATIONS
Inspection Freq: QUARTeRLY
SWIS#: 19-M-5J04
Owner: SEVE'RALLANDOWNERS(HOMEOWNERS)
FieldsNot Reported by the Source Operotor(l). OpPhOne(l). OpAddress(1). oaasaxOpState(l). Op~P(l).

Agency for thisSite: Waste(l). SurroundIngLond(1). RFIDafe(l). RFIAmend Dafe(l). PermItttvu Put(l).

Actual ThruPut(l). PermIttedCapaclly(I). Actual Capaclly(I). PermltTotal Acreoge(I). Actual TotalAcreoge(I). PermItDisposalAcreoge(I). Actual Disposal Acreooe(i>. OwPhone(l). OwAdd;m. oecse».OwStaterh: Ow~f)(I) I
I
I!
I
I
I
•I
IVISTA UNIONOILCOMPANY/UNOCALSTATION VISTA10#: 13567756 Address': DELVALLEOILFIELD ,
SANTACLARITA,CA 91350 ,
ISTATELUST- State Leaking Underground Storaoe Tank! SRC#164 EPA/Aaencv 10: N/A Agency Address: UNIONOILCOMPANYUNOCALSTATI
D£LVALlEOILFIELD
VALENCIA,CA91350
Sitename: UNIONOILCOMPANYUNOCALSTAT!
Street: D£LVALlEOILFIELD,
City: VALENCIA
Zip: 913SO
Region: ' 04
County: 19
Caseno: 1.()()696
Sitename: UNIONOILCOMPANYUNOCALSTAT!
I
I
I
I
•VISTAaddress includes enhanced city and ZIP.

Formore Information call VISTAInformation Solutions,Inc. at 1- 800- 767 - 0403.

Report 10:723401901 Date of Report: November 13 2000v. . ~7 'e-fSlcn..., Poge#18 I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
~
I
]
UNMAPPEDSITESCONT.

City:

Zip:'
Sub:

Leadagency:

Casetype:

Status:

Revlewdate:

Substance Desc:

Casetype Desc:

Reportdate:

StatusDesc:

VALENCIA
91SSO
8C06619
L
S
o
8/17/1987

GASOLINE
SOIL
5/1/1985

NOACTION
Streetno(I). Crossstreet(I).Countycode(I). Streetno(1).SUbqty(I).

Abatemethd(I). Datel(I). Date3o(I). DateSb(I). DateSc(I). ,DateSr(I).Date7(1).

Dote8tl). Date9tl)
FieldsNot Reported by the Source
Agency for thisSite:

VISTA AGUADULCEHYDROGEOLOGIC VISTA10#: 12725908
Address": INVESTIGATION
SANTACLARITA.CA 91350
IStateSpills/ SRC#107 EPA/Aaency 10: N/A
Agency Address: AGUADULCEHYDROGEOLOGICINVESTIGATION
AGUADULCE.CA 91.350
Facility 10: 62 .Remediation Status: SITEASSESSMENT
•VISTAaddress Includes enhanced city and ZIP.

Formore information call VISTAInformation Solutions.Inc. at 1- 800 - 767 - 0403.

Report 10:723401901 Date of Report: November 13, 2000
Vef$/on2.7 Poge#19

SITEASSESSMENTPLUSREPORT

DESCRIPTIONOFDATABASESSEARCHED
,A)DATABASESSEARCHE~TO1MILE
NPL
SRC#:19
VISTAconducts a database search to Identify all siteswithin 1mile of your property.

Theagency release date·for National PrioritiesUstwas April, 2000.

TheNPLReport isthe USEPA'sregistryof the nation's worst uncontrolled or abandoned hazardous waste sites. NPLsitesare.targeted for possiblelong-term remedlai action under the Comprehensive Environmental Response,Compensation, and Uablllty Act (CERCLA)of 1980.

SPL
SRC#:113
VISTAconducts a database search to Identify all siteswithin 1mile of your property.

Theagency release date for CalSltesDatabase was July, 2000. this database isprovided by the Cal. Environmental Protection Agency, Dept. of Toxic Substances Control. Theagency may be contacted at: 916-323-3400. , CORRACTS. VISTAconducts a database search to Identify all siteswithin 1mile of your property.

SRC#:14 Theagency release date for RCRISCorrective Action Siteswas March, 2000.

TheCORRACTSdatabase contains Information concerning RCRAfacilities that have conducted, or are currently conducting a corrective action. A Corrective Action Order IsIssuedpursuant to RCRASection 3008(h) when there hasbeen a release of hazardous waste or constituents into the environment from a RCRAfaCility.Corrective actions may also be imposed asa requirement of receiving and maintaining a TSDFpermit.

RCRIS-TSDC VISTAconducts a database search to Identify all siteswithin 1mile of your property.

SRC#:556 Theagency release date for RCRISTSDsSubject to Corrective Action was March, 2000.

TheEPA'sResourceConservation and Recovery Act (RCRA)Program Identifies and tracks hazardous waste from the point of generation to the point of disposal. TheRCRA Facilitiesdatabase isa compilation by the EPAof facilities which report generation, storage, transportation, treatment or disposal of hazardous waste. RCRATSDCsare treatment, storage and/or disposal facilities that are subject to corrective action under RCRA.

Formore information call VISTAInformation Solutions,Inc. at 1- 800- 767- 0403.

Report 10:723401901 Date of Report: November 13,2000
Version2.1 Page #20
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

I
I 18>DATA8ASESSEARCHEDTO1/2 MILE
I
CERClIS
SRCIt:17
I
I
I
I
NFRAP
SRC#:18
I
I
I
I
SCL
SRC##:112

I RCRIS-TSD
SRC#:12
I
I
I SWLF
SRC#:23
I
I
I
I
VISTAconducts a database search to identify all siteswithin 1/2 mile of your property.

Theagency release date for Comprehensive Environmental Response,Compensation and Uability Information Syswas April, 2000.

TheCERCLISdatabase isa comprehensive listingof known or suspected uncontrolled or abandoned hazardous waste sites.Thesesiteshave either been investigated. or are currently under investigation by the U.S.EPAfor the release. or threatened release of hazardous substances. Once a siteisplaced in CERCLIS.it may be subjected to several levelsof review and evaluation. and ultimately placed on the National PrioritiesList (NPL).

VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date for No FurtherRemedial Action Plannedwas April, 2000.

TheNo FurtherRemedial Action Planned Report (NFRAP).also known asthe CERCLIS Archive. contains Information pertaining to siteswhich have been removed from the U.S.

EPA'sCERCLISdatabase. NFRAPsitesmay be siteswhere. following an initial investigation. either no contamination was found. contamination was removed quickly without need for the siteto be placed on the NPL or the contamination was not serious enough to require federal Superfund action or NPLconsideration.

VISTAconducts a database search to identify all siteswithin 1/2 mile of your property.

Theagency release date for CalSltesDatabase was July, 2000.

Thisdatabase Isprovided by the Department of ToxicSubstancesControl. Two-thirdsof these siteshave been classified. based on available Info~mation.asneeding "NoFurther Action" (NFA)by the Department of ToxicSubstances Control. Theremaining sitesare In various stages of review and remediation to determine ifa problem existsat the site.

Severalhundred siteshave been remediated and are considered certified. Someof these sites may be Inlong term operation and maintenance.

VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date for RCRISTreatment, Storage and DisposalFacilities was March, 2000.
iJJ
i
TheEPA'sResource Conservation and Recovery Act (RCRA)Program Identifies and tracks hazardous waste from the point of generation to the point of disposal. TheRCRA Facilitiesdatabase Isa compilation by the EPAof facilitieswhich report generation. storage. transportation. treatment or disposal of hazardous waste. RCRATSDsare facilities which treat. store and/or dispose of hazardous waste.

VISTAconducts a database search to identify all siteswithin 1/2 mile of your property.

Theagency release date for USGSSolidWaste Landfillswas December, 1991.

Thisdatabase isprovided by the United StatesGeological Survey. Theagency may be contacted at: 703-648-5613.
,•I
Formore information call VISTAInformation Solutions.Inc. at 1- 800 - 767- 0403.

Report 10:723401901 Date of Report: November 13,2000
Ve~~n2.7 po.ge#21

SWLF
SRC#: 163

SWLF-CO
SRC#:51

SWLF-CO
SRCfI:70
WMUDS
SRCfI:68
SPILLS
SRCfI:107
LUST
SRCfI:164
I
VISTAconducts a database search to Identify all siteswithin 1/2mile of your property.

Theagency release date for SolidWaste Inventory System~as March, 2000. I IThisdatabase isprovided by the Integrated Waste Management Board. Theagency may be contacted at: 916-255-4021.

VISTAconducts a database search to Identify all siteswithin 1/2mHeof your property.

Theagency release date for LosAngeles County SoildWasteLandfills TransferStations was February, 1998.

I
IThisdatabase Isprovided by the Public Health Invesitgations. Hazardous Material Control Program. Theagency may be cont<;Icted at: 323·881-4151.

VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date for City of LosAngeles Landfills TransferStationswas April, 1999.. .

I
IThisdatabase Isprovided oy the City of LosAngeles, Environmental Affals Department.

Theagency may be contacted at: 213-580-1070.

VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date for Waste Management UnitData Systemwas February, 1999.

I
Thisdatabase Isprovided by the State Water ResourcesControl Board. Theagency may be contacted at:"530-892-0323.ThisIs used for program tracking and Inventory of waste management units.Thissystemcontains Information from: Facility,Waste Management Unit,SWATProgram and Report Summary Information, Chapter 15(formerly Subchapter 15),TPCAand RCRAProgram Information, Closure Information; also some Information from the WDS(Waste Discharge System).

VISTAconducts a database search to Identify all siteswithin 1/2mile of your property.

Theagency release date for Region4sLleSiteUstwas August, 1999.

I
I
I
IThisdatabase isprovided by the Regional Water Quality Control Board. Region #4. The agency may be contacted at: 323-266-7576. " '
VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date for Leaking Underground Storage TankInformation Systemwas July, 2000.

I
IThisdatabase Isprovided by the California Environmental Protection Agency. The agency may be contacted at: 916-445-6532. I
I
I
IFormore information call VISTAInformation Solutions.Inc. at 1- 800- 767-0403.

Report 10:723401901 Date of Report: November 13,2000
Version.;,',/ Page #22
I

I
I
I

LUST-REG
SRC##:108
I
I

LUST-REG
SRC##:121
I
I

LUST-REG
SRC##:128
I

I CORTESE
SRC##:53
I
I
I
I
I
I
~
J
J
]
VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date for Region6 Leaking Underground Storage Tankswas February, 2000.

Thisdatabase isprovided by the Lahontan Region SixSouth Lake Tahoe. Theagency may be contacted at: 530-542-5400.

VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date for Region4 Leaking Underground Storage Tankwas February, 2000.

Thisdatabase Isprovided by the Regional Water Quality Control Board, Region #4.The agency may be contacted at: 323-266-7582.

VISTAconducts a database search to identify all siteswithin 1/2 mile of your property.

Theagency release date for Region 6 Leaking Underground Storage Tank~was February, 2000.

Thisdatabase Isprovided by the Reglondl Water Quality Control Board, Region #6.The agency may be contacted at: 760-241-7365.

VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date for Cortese List- HazardousWaste Substance SiteListwas April, 1998.
. Thisdatabase Isprovided by the Office of Environmental Protection, Office of Hazardous Materials. Theagency may be contacted at: 916-445-6532.TheCalifornia Governor's Office of Planning and Research annually publishesa listingof potential and confirmed hazardous waste sitesthroughout the State of California under Government Code Section 65962.5.Thisdatabase (CORTESE)Isbased on Input from the following:
(1)CALSITE5-Departmentof ToxicSubstancesControl, Abandoned SitesProgram Information Systems;(2)SARATItleIIISection IIIToxicChemicals Release Inventory for 1987,1988,1989,and 1990;(3)FINDS;(4)HWI5-Department ofToxlc Substances Control, Hazardous Waste Information System.Vista has not Included one time generator facilities from Corfese Inour database.; (5)SWRCB-StateWater ResourcesControl Board; (6)SWI5-lntegrated Waste Management Control Board (solidwaste facilities); (7)AGT25-AlrResourcesBoard. dischargers of greater than 25tons of criteria pollutants to the air; (8)A1025-AlrResourcesBoard, dischargers of greater than 10and lessthan 25 tons of criteria pollutants to the air; (9)LTANK-SWRCBLeaking Underground Storage Tanks;(10)UTANK-SWRCBUnderground tanks reported to the SWEEPSsystems; (11)IUR-InventoryUpdate Rule(Chemical Manufacturers); (12)WB-LF-Waste Board - Leaking Facility, sitehas known migration; (13)WDSE-WasteDischarge System- Enforcement Action: (14)DTSCD-Departmentof Tox!CSubstance Control Docket.

Formore information call VISTAInformation Solutions,Inc. at 1- 800- 767- 0403.

Report ID:723401901 Date of Report: November 13,2000
Version2.7 Page #23

BORDER-ZON
SRC#:46

TOXICPITS
SRC#:49

USGS-WELLS
SRC#:3
I
VISTAconducts a database search to Identify all siteswithin 1/2 mile of your.property.

Theagency release date for Deed RestrictionPropertiesReportwas April, 1994. I.' ITheDeeds Restrictionslist,also known asthe BorderZone Property tlst,contains Information concerning voluntary deed restriction. Theseagreements are made with owners of property who propose building residences, schools. hospitals.or day care centers on property that ison orwithin 2.000feet of potentially hazardous waste site.

VISTAconducts a database search to Identify all siteswithin 1/2 mile of your property.

Theagency release date forToxic Pitswas February, 1995.

I
I
IThisdatabase Isprovided by the Water Quality Control Board, Divisionof Loans Grants.

Theagency may be contacted at: 916-227-4396.

VISTAconducts a database search to Identify ail siteswithin 1/2 mile of your property.

Theagency release date for USGSWaterWellswqs March, 1998.

ITheGround Water SiteInventory (GWSI)database was provided by the United States Geological Survey(USGS).Thedatabase contains information for over 1,000,000wells and other sources of groundwater which the USGShasstudied. used or documented during research.

I
VISTAconducts a database search to identify all siteswithin 1/4 mile of your property.

Theagency release date for RCRISFacilitieswith Violations ~as March, 2000.

I
I
Ic)DATABASESSEARCHEDTO1/4 MILE

RCRIS-VIOL
SRC#:11
UST
SRC#:45
TheEPA'sResource Conservation and Recovery Act (RCRA)Program identifies and tracks hazardous waste from the point of generation to the point of disposal. TheRCRA Facilitiesdatabase isa compilation by the EPAof facilities which report generation. storage, transportation, treatment or disposal of hazardous waste. TheRCRISOther report contains information concerning facilities that are "unclassified"within the RCRIS database (not classified asa Large Quantity Generator, Transporter.etc.).

VISTAconducts a database search to Identify all siteswithin 1/4 mile of your property.

Theagency release date for Underground Storage Tankswas January, 1994.

I
I
I
IThisdatabase isprovided by the State Water ResourcesControl Board. Office of Underground Storage Tanks.Theagency may be contacted at: 916-227-4364. Be advised that some states do not require registration of heating oil tanks.especially those used for residential purposes.

Formore information call VISTAInformation Solutions.Inc. at 1- 800- 767- 0403.

Report 10: 723401901 Date of Report: November 13,2000
VelSlon:,1 • Page#24

I

I UST-CO-LB
SRC##:56
I
I
I

UST-ELSE
SRC##:86
I

I UST-TORR
SRC##:101
I

I UST-CO-LA
SRC#:142
I
I
I
I
I
AST
SRC##:60
LACO-SITE"
SRC##:111
I
I
I
I
VISTAconducts a database search to ident:f t uii siteswithin 1/4 mile of your property.

Theagency release date for City of LongBeach Underground Storage Tankswas October, 1999.

Thisdatabase Isprovided by the City of long Beach FireDepartment. Theagency may be contacted at: 562-570-2560. Beadvised: Many states do not require registration of heating 011tanks, especially those used for residential purposes.

VISTAconducts a database search to Identify all siteswithin 1/4 mile of your property.

Theagency release date for City of EISegundo Underground Storage Tankswas November, 1999.

Thisdatabase isprovided by the City of EISegundo FireDepartment. Theagency may be contacted at: 310-607-2239. Beadvised: Many statesdo not require registration of heating 011tanks, especially those used for residential purposes.

VISTAconducts a database search to Identify all siteswithin 1/4 mile of your property.

Theagency release date for City of Torrance Underground StorageTankswas April, 2000.

Thisdatabase isprovided by the City of Torrance FirePrevention Division.Theagency may be contacted at: 310-618-2973. Beadvised: Many statesdo not require registration of heating 011tanks, especially those used forresidential purposes.

VISTAconducts a database search to Identify all siteswnhln 1/4 mile of your property.

Theagency release date for LosAngeles County USTStreetNumber Book was August, . 2000.

Thisdatabase isprovided by the los Angeles County Department of Public Works, .

Environmental Programs.Theagency may be contacted at: 626-458-4125. Beadvised:

Many states do not require registration of heating 011tanks, especially those used for residential purposes.

VISTAconducts a database search to Identify all siteswithin 1/4 mile of your property.

Theagency release date forAboveground Storage Tankswas December, 1999.

Thisdatabase Isprovided by the State Water ResourcesControl Board. Theagency may be contacted at: 916-227-4364.

VISTAconducts a database search to Identify all siteswithin 1/4 mile of your property.

Theagency release date for LosAngeles County SiteMitigation Complaint Control Log was August, 1999.

Thisdatabase Isprovided by the Department of Health Services,LACounty Public Health Investigations. Theagency may be contacted at: 323-890-7806.

Formore information call VISTAInformation Solutions,Inc. at 1- 800- 767- 0403.

Report ID:723401901 Date of Report: November 13,2000
vetslon2.1 Page #25

I
TRIS
SRC#:2
VISTAconducts a database search to Identify all siteswithin 1/4 mile of your property.

Theagency release date forToxic ReleaseInventory Systemwas January, 1998. I All facilities that manufacture. process.or import toxic chemicals in quantities Inexcess of 25.000pounds per year are required to registerwith the EPAunder Section 313of the Superfund Amendments and Reauthorization Act (SARATitleIII)of 1986. Data contained in the IRISsystemcovers approximately 20.000sitesand 75.000chemical releases.

I
I10)DATABASESSEARCHEDTO1/8 MILE
ERNS
SRC#:8
VISTAconducts a database search to Identify all siteswithin 1/8 mile of your property.

Theagency release date for Emergency ResponseNotification Systemwas August, 1999.

I
I

RCRA-LQG
SRC#:16
ERNSIsa national computer database systemthat Isused to store Information on the sudden and/or accidental reiease of hazardous substances. Indudlng petroleum. Into the environment. TheERNSreporting systemcontains preliminary Information on specific releases.including the spilllocation. the substance released. and the responsible party.

VISTAconducts a database search to Identify all siteswithin 1/8 mile of your property.

Theagency release date for RCRISLargeQuantity Generators was March, 2000.

I
I

RCRIS-SQG
SRC#:15
TheEPA'sResource ConseNatlon and Recovery Act (RCRA)Program Identifies and tracks hazardous waste from t[le point of generation to the point of disposal. TheRCRA Facilitiesdatabase isa compilation by the EPAof facilities which report generation. storage. transportation. treatment or disposalof hazardous waste. RCRAlarge •Generators are facilities which generate at least 1000kg./month of non-acutely hazardous waste (or 1kg./month of acutely hazardous waste).

VISTAconducts a database search to Identify all siteswithin 1/8 mile of your property.

Theagency release date for RCRISSmallQuantity Generators was March, 2000.

I
TheEPA'sResource oonservonon and Recovery Act (RCRA)Program identifies and tracks hazardous waste from the point of generation to the point of disposal. TheRCRA Facilitiesdatabase isa compilation by the EPAof facilities which report generation. storage. transportation. treatment or disposalof hazardous waste. RCRASmailQuantity Generators are facilities which generate lessthan 1000kg./month of non-acutely hazardous waste.

I
I
I
I
I.

I
I
End of Report I
IFormore information coil VISTAInformation Solutions.In.c.at 1- 800- 767- 0403.

Report 10:723401901 Date of Report: November 13,2000
Version2.7 Page#26
I

I
I
I
I
I
I-
-I
I
I
I
I
I
I
I
I
I
~
~
J

APPENDIXB

FOCUSED COASTAL CALIFORNIA

GNATCATCHER SURVEY RESULTS
Plum Canyon County Park Project Final Initial Study/Mitigated Negative Declaration 01008PI"",("",...",.v(.(,J«lfinll/l."'~' IIIOVOJ 10:14MI

I"
I
I
I
I
.'

EOAW INC
1420 KETTNER BOULEVARO
SUITE 620

SAN OIEOO CALIFORNIA
92101
I
I
TEL 619 233 1454
FAX 619 233 0.952
www.6daw.com
I
I
I
I
I
I
~
J
]

UNITEO STATES
EUROPE
AusrRA!.I"
July 23,2001
Mr. RickFarris
U.S.Fishand WildlifeService
Ventura Office
2493Portola Road, Suite B
Ventura, California 93003
Subject: ResultsofFocusedCoastalCalifornia Gnatcatcher Surveys Conducted at the Plum Canyon Park Site,LosAngeles County
Dear Mr.Farris:

This report is notification that focused presence/absence surveys for the coastal Californiagnatcatcher (Polioplila califomicacalifomica)have beenconducted forthe Plum Canyon County Parkprojectsite,LosAngelesCounty, California (Appendix A, Figure 1). The project is not a participant in the Natural Community Conservation Planning (NCCP)program. These surveys were conducted by Erik LaCoste ofEDAW,Inc.(formallyKEAEnvironmental, Inc.) pursuant to the terms and conditions ofpermit numberTE-027736-1,issued under Section10(a)1(A)ofthe Endangered SpeciesAct,asamended. '
ThePlum Canyon County Parkprojectincludes theconversion ofapproximately 7 of13acres ofundeveloped land into apassive and active year-round public park.

Developed areas would consistofwalkways, utilities, totsplay area,siteamenities (picnic tables, park benches, bicycle rack, etc.), landscape and irrigation, restrooms/maintenance area,a1S-spa'ceparking lot,security lighting,and signage.

The primary objective of the project, as identified by the Los Angeles County Department ofParks and Recreation,istodevelop anew park that would provide passive and activeyear-round recreation opportunities toserve thelocalresidential community. Specifically, the project objective is to provide a localpark with a service radius of up to one-half mile. Mitigation measures to off-set impacts associated with this project include focused surveys for the federally listed threatened coastal California gnatcatcher toensure that impacts tothisspecies are avoided.

METHODS
The gnatcatcher survey area included all appropriate gnatcatcher habitat in the projectimpactarea aswellasallappropriate habitatwithin a500-footbufferaround the impact area (Appendix A, Figure 2). A total of approximately 13.0acres of appropriate habitat were included in the survey area. Surveys were conducted following the Coastal California Gnatcatcher Presence/absence Survey Protocol (USFWS 1997). Taped gnatcatcher vocalizations were occasionally played throughout thesurveys. Accordingtothesurvey protocol,allareasnot included in the NCCP program should be surveyed a minimum of 6 times when conducted between March 15and June30.Focused surveys were conducted between May 14 f)l'!r.IIlN, PLMHIIHO ANO ~N\llnO"''''I!IITS WORLOWIOE

.,
I
Mr. RickFarris
U.S.Fish and WildlifeService
July 23,2001

Page 2 ends

I
I
and June 19,2001. Survey conditions for each of the six surveys is provided in Table 1.

I
I.. Table1
Gnatcatcher Survey Conditions
I
I
Date Time WeatherConditions Biologist SurveyRate
May 14,2001 0845-1050 Start Sunnyand clear,61°F, E.LaCoste 6.25 windsof1-3mph acre/hour
End:Sunnyand clear,74of,
windsof
1-3mph
May21,2001 1005-1150 Start:Sunnyand clear,74OF, E.LaCoste 7.43 windsof1-3mph acre/hour
End:Sunnyand clear,86 OF,
windsof
2-4mph
- -May29,2001 0900-1100 Start Sunnyand clear,68OF, E.laCoste 6.5 windsof1-3mph acre/hour
End:Sunnyand clear,76 OF,
windsof
1-3mph
June5, 2001 0930-1115 Start:Sunnyand clear,72OF, E.laCoste 7.43 windsof0-1mph acre/hour
End:Sunnyand clear,75 OF,
windsof
1-3mph
June 12,2001 0900-1045 Start:Sunnyand clear,65o.F, E.LaCoste 7.43 windsof0-1mph acre/hour
End:Sunnyand clear,70OF,
windsof
2-4mph
June 19,2001 0940-1115 Start:Sunnyand clear,78OF, E.laCoste 8.23 windsof0-1mph acre/hour
End:Sunnyand clear,93 OF,
windso( .1-3mph
I
I
I
I
I
I
I
I

IRESULTS
IThesurvey siteisroughlyrectangular inshape. Urbandevelopment occursonthree sides of the project area while a paved road (Plum Canyon Road) occurs on the I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
J
]
J
J
Mr. RickFarris
U.S.Fish and WildlifeService
July 23,2001

Page 3 ends

fourth. The area in general is very active with human activity, particularly development. Approximately half of the site has been disturbed in the past by grading and terracing, possibly during initial housing development in the immediate area. Vegetation in this disturbed area is consistent with disturbed coastal sage scrub habitat: vegetation consists of an almost monotypic stand of deerweed (Lotus scoparius)with fewforb(non-grass herbaceous cover)species.A drainage occurs in the northeast comer of the site. This drainage has few plant speciesand, along with the terraced area, appears tobe used frequently asan off­ road recreational area by localkids.

Coastal sage scrub habitat, a vegetation type preferred by the coastal California gnatcatcher, does cover the eastern half of the site adjacent to both the disturbed area and the drainage. Dominant plant species include purple sage (Salvia JeucophyUa),California sage (Artemisia caJifomica), and California buckwheat (Eriogonum /ascicuJatum).Mostofthecoastalsagescrub occurs outside theproject boundary yet within the500-footbuffer area.

No coastal California gnatcatchers were observed or detected during any of the focused surveys. The absenceofthegnatcatcher may be attributed totheisolated nature of theproject site and thehigh levelof urban development. Inaddition, the CaliforniaNatural DiversityDatabase(CNDDB)doesnotcontainanyrecordsforthe gnatcatcher inthisarea.Wildlifespeciesobserved during thesurveys isincluded in Appendix Band field forms areincluded in Appendix C.

If you have any comments orquestions regarding thisletter report, pleasefeelfree tocontact me at (619)233-1454.

Sincerely, .
/:/ /} /Z~""~r(....-,(_.,~ -z»:t::/Erik LaCoste
Wildlife Biologist
Appendices:

Survey Maps
WildlifeSpeciesObserved
Field Notes
If/·OO8PlumC1IIyonCAGNRcport.wpd

I
I
I
I
I
I
I _ APPENDIXA

SURVEYMAPS
I
,I
I
I
I
I
I
I
I
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Figure 1
Project Location/Survey Area
PlumCanyonCounty ParkOJomtPtnmCflfly()'IV'~i!;~m!J\Pmjec,LocmicmlSIlI'\leyArea JIIJOIOO

I
I
I
I
I
\. ~-,
----,-_, I
,......._, I\ ,-_.-"
I
I/,... ;-
( . <, .Ij.,_:'"
,
f
·1
I
I
I
I'\ .-,
\ \
I
IAREA SURVEYED FOR COASTAL CALIFORNIA GNATCATCHER­

INCLUDES SOO-FOOTBUFFER
APPROPRIATE HABITAT FOR COASTAL CALIFORNIAGNATCATCHER­

WITHIN THE SURVEY AREA
I\ ....

Figure 2
Gnatcatcher Survey Area I
PlumCanyon County Park01008 Plum C.-rnyon\Figrm:s\FigJ Gnatcaicber SurveyArl"Q 7//8/0/ I
I

I
I
I
I
I
I
I
I
I
I
I

APPENDIXB

WILDLIFESPECIESOBSERVEDDURING SURVEYS

I
I
I
AppendixB
Wildlife SpeciesObserved at thePlum Canyon Park ProjectSite I
I
Common Name
I
I
Birds
Mourning dove
Northern mockingbird
Cliffswallow
California quail
California towhee
House finch
Bushtit
Southern California rufous-crowned sparrow
Bell'sSagesparrow
Costa's hummingbird
Western kingbird
Lessergoldfinch
Bewick'swren
Greater roadrunner
Red-tailed hawk
Common yellowthroat
Scrubjay
Say's phoebe
European starling
Black-headedgrosbeak
Oriolespecies
I
I
I
I
I Mammals
Audubon's cottontail
Ground squirrel
I Reptile
Sideblotchlizard
I
J
Insects
Acmonblue
Common hairstreak
Behr'smetalmark
Cabbagewhite
Painted lady
Aniseswallowtail
Striated queen
Unknown sulfur
Unknown folded-wing skipper
Unknown hairstreak
j
J
J
]
ScientificName
Zenaida macroura
Mimus polyglottos
Hirundo pyrrhonota
Callipeplacalifornica
Pipilo crissalis
Ca~odacusmexlcanus
Psaltriparusminimus
Aimophils ruficeps canescens
Amphispiza bellibelli
Calypte costa
Tyrannus verticalis
Carduelispsaltria
Thryomanes bewickii
Geococcyxcalifornianus
Buteojamaicensis
Geothlypis trichas
Aphelocoma coerulescens
Sayornis saya
Sturnus vulgaris
Pheucticus melanocephalus
Icterussp.

Sylvilagusaudubonii
Spermophilus beecheyi
Utastansburians
Plebejusacmon acmon
Strymon meJinuspudica
Apodemia mormo virgulti
Pierisrapae
Vc1nessacardui
Papiliozelicaonzelicson
Danausgilippus
Unknown sulfur
Unknown skipper
Unknown hairstreak

i I
! I
I
I
I
I ..

I APPENDIXC

SURVEYNOTES
I
I
I
I
I
I
I
I
I
I
I
I

I
I
I
I
I
I
I
I
I
I
I
I
J
J
]
J

FIELD JOURNAL
Job# I Hoa8. oIAdd'lPersons__ - ~---
Start Time Q$c.f5" End Time WECo•
PurposeofVisit \ if CA-6N sCJI'.J~
Start Weather: Temp (Q! 0 Wind SplDir From \ -"} %Clds -e- Pcp ..fY Describe Surrounding Land Uses and Discuss Wildlife Movement Corridors and Habitat Linkages.

Obs.No. Time Notes
I~.u- s(~C:.s
lO~ I\J~;i ( ~tS,.I"~
• f I
CurrentWeather: Temp 11DWindSplDirFrom (- '3
Pane1of It> __
%Clds ~ Pcp ,er

·.
/
FmLD JOURNAL
15_MVD Job# Ii+Od9I
Add'lPersons
StartTime (0 (/S':::---'::"En--:d~T-im-e---:-'I"""S=-O-- PurposeofVisit G2NfJ@(\.tVtCA.kCh~fZ._ SVIV~
StartWeather: Temp -'4 () WindSplDirFrom 1- S ~ %Clds ..Q:= Pcp ..t;;;;-= DescribeSurrounding Land UsesandDiscussWildlifeMovementCorridors and Habitat Linkages.

Obs.No. Time Notes
IOb~
~I
Un IMD
r
WindSplDirFrom ~ - '-I
Pagclof_t_
%Clds .:t:C:PCp_..fII"«o.::::...._
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

I ~ mLDJOURNAL
JobName.l1().v\A Lft:,., _ \S lI\,I\I'..J'~. Job# _
Observer r-;.ill (c:"_ J)...(A3.:~. <r Add'!Persons. 19.::::·:::._-__ ~~--- Date ~ /7'" I 0 \ StartTime () YI 0 EndTime 110()
Location •r>tY~.(~1. 0-('\ 1;:;•~I :. U f , \..',"- ,
HabitatDescription 1,/%;, '1)(7"" I
I
I
I
I
Purposeof Visit ~ t'"~ I .'(~I~/(,J ~.;.\J f J '\t,'e=:- StartWeather: Temp (t)~/;, Wind SplDir From 1-''].' %Clds ¢ Pcp t5 Describe Surrounding Land Uses and Discuss Wildlife MovementCorridorsand Habitat Linkages I
I
.Obs.No. Time Notes
/11,. I';~' ~) .., st: .,,_~.:sf ;I~O ",'f~ osi- Cj~.:..../;.r.q, :,.,. l ...) A, . " . 4A),n.:, CLf f'".,e "';<",(} . [}Cj..: V, .r) Q;; c..-'l (- -- -!e//<A...C("t:' (-0'l'.t',q. _ a: G7Do(:;I
'i)1)1~Jt'l iVle IC.(/·{)/?.s:·'e!(. p~/~O/J..f
n J • fi ft;,s:;:c.;1J il- ald'-'1~ (-0 /"'fI~//1 -O,/i';r:1 :'1.:1/1 e.";:/1:,A... P{.t).lt!J c/ f1/7~.YIC.I(f- d.n? • "7F cIt'.:"f ,,,.;,.:,ro.£""" A&f ;Jr't., ,. (.[)()J;Vi/J1?d tll(t/'~1) I)- t.,().A- ft,_'(_ ~~f! /i ",r'/('A,i ! .~ AP1e.c x: I_el'? 1t..~. S:b1-(,
C1
1(7)0 '5wl-(/1-'') fh·t.. Sv-t(/·"r.,
SP~(")-el ()(l (~e/'.t:t..J5...;...~ olJ,,~Y'"<;'~C:l i:~.

O/lffZ K'Wt,(j/t:J......v Ac~oll'1 elv'f:..,
6/ &vC<-.il Scz.hv--f m~/t{jlM~/ ~
RbtLJ)~ /1-'..1 ell.__. f:.aP .. /.Jfh.//"t',.
w('?f,A-:.f.- P('a tJ ,.~ tt lM"It-h~ .
(0./ t-1)'.AJ/,t'.-t~_ ." /
r;)1M coi01'
mlO ~r/-e.. a (f!..,"h.' \0vl-'1,. .

Co5ftfJ/.hA/VI/Y\A.-f '1.._ &t:Jvv>&;;:'i).",;Ilfd I
"10 VVIO :{::; ,,/\ "...I" n ..{ '])1, eJc,vlN ~~I
IN..k'(",tt, t~!I ,) la,I/&t-~ { ,~~l-... C;1~\f..-er
8~1~.0 (././ /,~ ........... F2 ""1 GA~'_", !.?_VI\. ~
1-1-0-[-:.I
'/00 ellL) ,. l1Jo eA-?N L,oC!?<'_"- c.-~,;.1/I"1/ /.. ("'J -c,' <'C I I rf1.,c (..{~(..,."~.:; re.ofJ/<='·hck~ 01.)';-, ':-V(A I:; ~\(..(.) ;1.. ( " L • ,,:" _l iiCllt~/ (.c, «Lr. •{;'()O/'A-~" ~ '·v'l·~ /"r A-r.J(.(A! '-('cfj" <; If' I .~'
Lo l-.,,;1.,' ')r,.../) "" /1"" .
/t-fl ·h;i/r';) ?l~ Y-I/'1/(.' J'/!j I..~ .~
.~../t4,.,~"...~j r?_••/
.'~..,< , .,
~ I.....:~ 'oJ:.,,'", .=.1·- I i t:

I
I
I
I
I
J
]
J
J
J
"71CurrentWeather: Temp I ~:; Wind SplDir From ! .-. . %Clds /.; Pcp Page I of__

ti\)
rr
I

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

(5,-
~~I!} .
~£I.:s (:-
'(
~zqII~
~I
I
I
II
I
"I:-
l1'_
"-4
t . ~
~f;"'\) ~
~ 0- ~~~
)
(\
~ ~
\ ~
~ J ,:~ (,. 'J:--~
'\:, '}-:. ''\~'
\ '~O('j"
" I;
V"l /)" t\l ~ ..?
~C ,. :~ ~,~ (' .. '~""
'\
~ '""""".,
f,·~

I ·a-MilI EOAW INC
I 350 SOUTII GRAND AVENUE
I SUITE 3920A

LOS ANGELES CALIFORNIA
90071
I TEL 213 229 0150
I FAX 213 229 0155
www"cdaw",c'om
I
I
I
I
I
I
I
I
I
I
I
I
I

MEMORANDUM
TO Lillie Lowery, Departmental Facilities Planner I
FROM Madonna Marcelo
DATE November 2,2001
CC
SUBJECT USFWS Concurrence with the Results of the Gnatcatcher Surveys EDAW contacted Mr. Rick Farris of the U.S. Fish and Wildlife Service (USFWS) on October 24, 2001: to confirm the adequacy of the report we submitted to the USFWS in July presenting the results of the coastal California gnatcatcher surveys we conducted for the Plum Canyon County Park project site.

Mr. Farris verbally confirmed thatour report was satisfactory to the USFWS. Subsequently, on November I, 2001, Mr. Farris stated in an e-mail that "the coastal California gnatcatcher survey report sent to us inJuly appears to be adequate. Because none were sighted, no further coordination with us is required at this time. However, if the species appears during the project, activities must cease until we are contacted and the appropriate coordination is completed; possibly including application for an incidental take permit." DESIGN. PLANNING AND ENVIRONMENTS WORLDWIDE

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

← All documents from this meeting