1450 Frazee Road, Suite 100, San Diego, CA 92108  Tele: 858 514-8377  Fax: 858 514-8608  www.dokkenengineering.com June 7, 2024

Ms. Jackie Lillio, PE, TE
Senior Engineer
Department of Public Works – Capital Improvement Projects City of Santa Clarita
23920 Valencia Boulevard
Santa Clarita, CA 91355

RE: Amendment for Professional Services – Vista Canyon Bridge Engineering Design Support During Construction and Project Close Out

Ms. Lillio:

Dokken Engineering is pleased to submit this scope and fee amendment to provide engineering design support during construction and prepare project close out documentation to complete the Vista Canyon Road Bridge over the Santa Clara River in the City of Santa Clarita . A breakdown of proposed support tasks is provided below:

Task 1.1: Engineering Design Support During Construction Dokken Engineering will be available to support the construction of the Vista Canyon Bridge and assist with interpretation of the contract documents for the overall project. Engineering Design Support during Construction includes the following for a Lump Sum Engineering Fee of $275,000:

Construction Meetings: Dokken Engineering will attend the pre -construction meeting and assist with preparation of meeting notes, answering questions, and providing clarification to the plans and project specifications as required. The Dokken team will be available to attend construction meetings (virtually) on an as-needed basis and attend up to two construction meetings in-person as directed by the City.

Site Inspection Visits: Dokken Engineering will conduct up to eight site visits to aide in resolving potential construction Requests for Information (RFI’s) and assist the Construction Management team in observing the progress of construction. The eight site visits will be in addition to any site visits conducted during weekly construction meetings that the Dokken team attends in person. Dokken Engineering will notify the Construction Management team of any inconsistencies between the present field conditions/construction progress and the project plans and specifications.

Respond to Requests for Information (RFI’s) and Change Requests (CR’s): Dokken Engineering will provide ongoing consultation and interpretation of contract documents (project specifications and Vista Canyon Bridge plans) as requested by the Contractor through the Construction Management team and the City.

Written responses will be provided for RFI’s and CR’s regarding the Vista Canyon Bridge foundation, substructure, superstructure, bridge approach slab, and crash cushions, along with approach guard rails to be installed below the existing Caltrans SR-14 bridge. Supplemental or revised drawings and specifications may be issued to provide clarity to the Construction Management team and the Contractor in support of RFI’s, CR’s, and design changes due to differing site conditions.

Review of Construction Submittals: Dokken Engineering will review construction submittals for: shop drawings (precast concrete girders, including review of bridge profile and camber calculations), concrete mix designs, temporary shoring plans for Vista Canyon Bridge related earthwork, Vista Canyon Bridge related falsework plans, Cast -in-Drilled-Hole Pile (CIDH) pile installation plans, driven pile installation plans, and temporary water diversion plans (as -needed) for conformance with the project plans, specifications, and permits. Dokken Engineering will also provide review and analysis of CIDH pile gamma -gamma logging reports, recommend supplemental cross sonic logging tests and reports as needed, and work with the Contractor and Construction Management team to evaluate any CIDH pile mitigation repair strategies that may be required.

1450 Frazee Road, Suite 100, San Diego, CA 92108  Tele: 858 514-8377  Fax: 858 514-8608  www.dokkenengineering.com Contract Change Order (CCO) Support: Dokken Engineering will assist the City’s Project Manager and Construction Manager in reviewing CCO requests. Dokken Engineering will review applicable CCO’s and work with the design team discipline leads (Civil, Bridge, Signals, Landscape, Lighting, Utilities, and Water) to prepare a construction cost estimate for the changes associated with the CCO, assist with providing new or revised technical specifications for change order work, and provide a recommendation to the City for the request.

Supplemental Engineering Support Services: Dokken Engineering will assist the City’s Project Manager with any questions and requirements for working within Caltrans Right -of-Way, provide assistance with processing the Caltrans Encroachment Permit, and assist with the application to obtain a bridge number through Caltrans local assistance.

Task 1.2: Project Close Out
The Dokken Engineering team will work with the City’s Project Manager and Construction Manager to close out the Vista Canyon Bridge portion of the project. The Dokken team will ensure that all work performed for the Vista Canyon Bridge was completed pursuant to the project plans and specifications. Project Close Out includes the following for a Lump Sum Engineering Fee of $45,000:

Final Inspection: The Dokken Engineering team will complete a final walk -through near the end of construction activities to perform the final inspection of the Vista Canyon Bridge work with the City’s Project Manager and Construction Manager to develop a ‘punch -list’ of pending construction items to be completed prior to project close-out.

As-Built Plans: At completion of construction, the Dokken team will prepare the final record drawings (as - built plans) for the Vista Canyon Bridge based on markups received from the Construction Manager and Contractor, along with supplemental or revised drawings from addenda or RFI’s. Vista Canyon Bridge Drawings will be provided in both PDF and in full -size mylars. Dokken Engineering will work with the design team disciplines leads (Civil, Bridge, Signals, Landscape, Lighting, Utilities, and Water) to assemble the final record drawing set for the Vista Canyon Bridge project. Dokken Engineering will assist the City with obtaining product literature, recommended maintenance guides, and warranty information for features installed as part of the project.

The proposed amendment fee for providing Design Support During Construction and Project Close Out for the Vista Canyon Bridge over the Santa Clara River is $320,000, lump sum, to be paid in increments towards the successful completion of the following milestones:

• Completion of Bridge Construction: $275,000
• Completion of As-Built Plans: $45,000
Amendment Lump Sum Total: $320,000
If you have any questions or wish to discuss this proposal in further detail, do not hesitate to give me a call at (858) 514-8377, or contact me by email at [email protected] Sincerely,

DOKKEN ENGINEERING

Charles Tornaci, PE
Project Manager
1 Peters Canyon Rd., Ste.130, Irvine, CA 92606 | tel. 949.387.8500| fax. 949.387.0800 | www.idsgi.com Work Authorization #6 Request
June 4, 2024
Jim Backer
Vista Canyon, LLC
27451 Tourney Road, Ste. #250
Valencia, CA 91355
PROJECT: Vista Canyon Blvd Bridge Lighting
IDS PROJECT No. 16E035.01
WA REQUESTED BY: City of Santa Clarita
SCOPE OF WORK:

We are requesting work authorization for the following work based on your request.

1. Extended fees to complete the construction support phase, including submittals and RFIs review, as-built plans, attending up to (4) online meetings during construction, and project closeout. There is $1,650 remaining from original project contracts and work authorizations that will be used with the below fee, leaving $6,650 for the construction support phase.

FEES:
☐ Reimbursable
Expenses:
☐ Non-
Billable
☐ Billable
☐ Construction
Documents
☒ Lump
Sum
$5,000 ☐ Hourly (NTE)
CURRENT HOURLY RATES:

Principal ...................................................... $234 Associate Principal .................................... $220 Senior Project Manager | Associate .......... $211
Senior Planner .......................................... $211 QA/QC Manager ........................................ $211 Registered Architect or Engineer ............. $197
Project Manager ........................................ $197 Senior Architect or Engineer ..................... $185 Senior Cost Estimator ................................ $175 Project Architect or Engineer ..................... $175 Designer Architect or Engineer ................. $160
Engineering Designer ‐ BIM ...................... $139
Spec Writer ................................................ $160 Architectural Job Captain | Designer ........ $132
CAD Drafting Engineer | Architect............. $118
Office Administration.................................... $73 APPROVAL:

This proposal for consulting engineering services is accepted, and all conditions are agreed upon.

Client/Company: ______________________________ Date: _____________________________ By: ________________________________________ Title: _____________________________ Note:

We will only proceed upon receipt of the signed authorization.

Invoices are due 60 days from their date and will accrue interest at 10% per annum beginning 60 days after receipt of the prime contract fees. If an invoice becomes delinquent for any reason, we have the right to suspend services and withhold or withdraw instruments of service pending payment. We have the right to be reimbursed for attorney’s fees and reasonable related costs incurred in collection efforts.

Work Authorization #6 Request for Additional Services Vista Canyon Blvd Bridge Lighting
Jim Backer
Vista Canyon,
LLC June 4, 2024 16E035.01

Page 2 of 2 ends

S:\PROJECTS\2016\Elec\16E035.01 Vista Canyon Blvd - Bridge Lighting\01 PM\02 Proposals\2024-0604 Work Auth 6 - VC Bridge Lighting - Vista Canyon.docx

kimley-horn.com 660 S. Figueroa St, Suite 2050, Los Angeles, CA 90017 213-354-9402

June 6, 2024

Jackie Lillio
Senior Engineer
City of Santa Clarita
23920 Valencia Blvd.

Santa Clarita, CA 91355

Re: Construction Support Services for Vista Canyon Project in City of Santa Clarita

Dear Ms. Lillio

This letter requests your authorization for the following additional bid and construction support tasks, not included in our original contract for the Vista Canyon Project in the City of Santa Clarita.

Kimley-Horn will provide bid and construction support services for the Vista Canyon Project including the following:

 Attend one (1) pre-bid meeting at the site
 Review contractor bids
 Review up to (20) submittals
 Respond to up to ten (10) requests for information (RFIs)  Attend up to three (3) progress meetings
 Attend up to two (2) construction site visit meetings  Record Drawings (AutoCAD Files, and PDF)

Our anticipated fee for these services is $27,500. These services are outside of the scope of our original contract and require your written authorization. These efforts were completed under the terms and conditions of our original contract.

Please sign where indicated to authorize these additional services and email back to us at [email protected] cc [email protected]. Please call me if you have any questions or if you require any additional information at 213-354-9402.

Very truly yours,

KIMLEY-HORN AND ASSOCIATES, INC.

Authorized By:

Jean Fares, P.E.

Sr. Vice President

Accepted by: City of Santa Clarita

By:
(Member or Manager, as authorized) (Date)

(Print or Type Name) (Date

R. T. FRANKIAN & ASSOCIATES
26027 Huntington Lane Suite A Santa Clarita California 91355 tel. (818) 531-1501 www.rtfrankian.com

June 10, 2024

City of Santa Clarita
23920 Valencia Boulevard P020(R)-2024-004
Santa Clarita, California 91355 Job No. 2015-415-00 4

Attention: Ms. Jackie Lillio

Subject: Proposal to Provide Geotechnical Services
Observation and Testing
Vista Canyon Boulevard Vehicle/Pedestrian Bridge
Tract No. 62322
Vista Canyon Development
Santa Clarita, California

It is with pleasure that we present this proposal t hat includes an estimate of the costs to provide geotechnical services associated with the subject site.

SCOPE OF SERVICES
The revised scope of work being proposed is based o n discussions and/or information that was provided for our use. Based on this information, we have prepared a detailed table of our proposed services and estimated costs. Please see Attachmen t A – Scope of Services. Please contact us if you would like us to modify the scope of services in this proposal.

ESTIMATED EXPENSES
The cost for our services is based on the rates indicated on the attached Fee Schedule. A detailed estimate broken down by task number is provided in Attachment A – Scope of Services.

The estimate provided in Attachment A is for budget ary purposes. The estimate is not a fixed cost. Our services will be billed on a time and materials basis in accordance with the attached Fee Schedule. We will only invoice for wo rk and services actually performed.

Furthermore, should you or your representative requ est services beyond those defined in City of Santa Clarita
June 10, 2024
2015-415-004
P020(R)-2024-004

Page 2 ends

Attachment A – Scope of Services, such services will be invoiced in accordance with the rates indicated on the attached Fee Schedule. This cost estimate is valid for a period of 60 days from the date of this proposal. Invoicing generally takes place every two weeks.

CALIFORNIA PREVAILING WAGES
It is our understanding that the project is subject to California Prevailing Wages. Therefore, the cost estimates presented in this Addendum Proposal are based on our attached current Prevailing Wage Fee Schedule.

ADDITIONAL SERVICES
Additional requested or required services not inclu ded within the scope of services described herein would be invoiced in accordance with the attached Fee Schedule.

AUTHORIZATION
Please provide us with a contract based upon this proposal as detailed in Attachment A.

-o0o-

City of Santa Clarita
June 10, 2024
2015-415-004
P020(R)-2024-004

Page 3 ends

Should you desire to discuss or clarify the propose d scope of work or any other aspect of this proposal, please do not hesitate to contact our office.

Yours very truly,

R. T. FRANKIAN & ASSOCIATES

by: James Frankian
President

and: Alan W. Rasplicka
BKP/AWR/jh Principal Geotechnical Engineer

Attachments: Attachment “A” – Scope of Services
Fee Schedule

PROPOSAL SUMMARY 6/10/2024
Attachment A P020(R)-2024 004
City of Santa Clarita 2015-415
Attention:Ms. Jackie Lillio
Subject: Vista Canyon Boulevard Vehicle/Pedestrian Bridge Task # Total
001 $64,291.00
002 $112,732.00
003 $24,134.00
004 $14,029.00
005 $67,257.00
006 $13,439.00
007 $17,185.00
Total without Task 007 - Alternates: $295,882.00
Total with Task 007 - Alternates: $313,067.00

GENERAL NOTES
Field observation and testing for Tasks 1.0, 2.0, 3.3, and 4.0 include Field Supervision, Job Discussion, and Trip Charges. See Figure A Details for more information. Estimated budgets presented are based on time and expense invoicing. We will only invoice for services provided in accordance with the attached Fee Schedule. No overtime assumed. Actual hours to be coordinated with City of Santa Clarita staff and/or their representatives.

Task Description
Bridge Foundation
Grading & Roadway Construction
ChamberMaxx
Utilities
Construction Support
Laboratory Testing
Alternates
City of Santa Clarita
P020(R)-2024-004
June 10, 2024

Page 1 of 1 ends

Attachment A
City of Santa Clarita
June 10, 2024
Attachment A Details 2015-415-004
P020(R)-2024-004
ID TASK Trips HR/TRIP
(ave)
Total Field
Hrs
Budget
Estimate NOTES

1.0 1.1 8' CIDH Piers (24) 24 8.0 193 $45,256

1.2 6' CIDH Piers (4) Task removed at request of CSC

1.3 Driven H Piles (48) 5 8.0 43 $10,057

1.4 Pier Backfill 0 0.0 0 Task removed at request of CS C

1.5 Specific Gravity/Gamma Gamma
testing (28) Task removed at request of CSC

1.6 Crosshole Sonic Logging (6) Task removed at reque st of CSC

1.7 Geotechnical Review of CSL 26.8 $8,978

1.8 Final Report 1 Report Est Budget included in Task 5.6

2.0 2.1 Soil Cement (Grade Adj.Only) 13 6.0 80 $20,042 No O&T for rip rap placement - to be performed by others

2.2 Vista Cyn Circle - Grading 11 6.5 70 $17,167

2.2.1 Vista Cyn Circle - Curb & Gutter 20 6.5 131 $32,18 8 No Sidewalk O&T: per discussion with Jackie Lillio , CSC

2.2.2 Vista Cyn Circle - Asphalt 12 6.5 78 $19,313

2.3 Soledad Connector - Grading 6 6.5 39 $9,609 O&T for median and turn pocket. Includes soil subgrade, base course, and paving.

2.3.1 Soledad Connector - Curb & Gutter 5 6.5 33 $8,007 O&T for median and turn pocket. Includes soil subgrade, base course, and paving.

2.3.2 Soledad Connector - Asphalt 4 6.5 26 $6,406 O&T for median and turn pocket. Includes soil subgrade, base course, and paving.

2.4 Final Report 1 Report Est Budget included in Task 5.6

3.0 3.1 Infiltration Testing 0 0.0 0 $0 Task removed at reque st of CSC

3.1.1 Infiltration Report Task removed at request of CSC

3.2 ChamberMaxx Shoring Design 24 $8,040

3.2.1 ChamberMaxx Shoring Report 1 Report Est Budget included in Task 5.6

3.3 ChamberMaxx Installation O&T 10 6.5 65 $16,094

3.3.1 ChamberMaxx O&T Report 1 Report Est Budget incl uded in Task 5.6 Bridge Foundation
Grading & Roadway Construction
ChamberMaxx

Page 1 of 2 ends

City of Santa Clarita
June 10, 2024
Attachment A Details 2015-415-004
P020(R)-2024-004
ID TASK Trips HR/TRIP
(ave)
Total Field
Hrs
Budget
Estimate NOTES
Bridge Foundation 4.0

4.1 Water Line $0

4.2 Storm Drain 9 6.0 56 $14,029

4.3 Utility Reports 1 Report Est Budget included in T ask 5.6

5.0 5.1 Project meetings 13 2.0 26 $10,920

5.2 Bid support & RFI 3.0 9 $3,015

5.3 Project job discussions 30 $7,950

5.4 Office Engineering & Analysis 30 $10,050

5.5 Data Processing & Management 30 $4,200

5.6 Final Reports (5) $31,122 Includes a total of 5 re ports - Tasks 1.8, 2.4, 3.2.1, 3.3.1, 4.3

6.0 6.1 Max. Density 6 3.0 24 $5,229

6.2 Sieve Analysis 6 2.0 16 $3,939

6.3 R-Value Task removed at request of CSC

6.4 Other 6 2.0 16 $4,271

7.0 7.1 Alternate 3 - Bike Path &
Pedestrian Trail 0 $0 Task removed at request of CSC

7.2 Alternate 4 - Southern Extension of
Vista Cyn Blvd 12 6.0 72 $17,185
Shown on Sht 105-107. Southern extension of Vista Canyon Boulevard between Humphreys Pkwy and Vista Canyon Blvd. Includes O&T for base course and paving only, per CSC

7.3 Material Testing - Concrete Task removed at reque st of CSC Laboratory Testing
Utilities
Construction Support
Alternates

Page 2 of 2 ends

P020(R)-2024-004

FEE SCHEDULE
City of Santa Clarita
Geotechnical Services – Observation and Testing
Vista Canyon Boulevard Vehicle/Pedestrian Bridge
Tract No. 62322, Santa Clarita, California
Proposal No. P020(R)-2024-004, Job No. 2015-415-004

PERSONNEL RATE ($/HOUR)

MANAGING PRINCIPAL/CONSULTING GEOTECHNICAL ENGINEER .................................................. $365.00 PRINCIPAL ENGINEER/PRINCIPAL GEOLOGIST .......................................................................................... $335.00 GEOTECHNICAL ENGINEER/ENGINEERING GEOLOGIST ........................................................................ $315.00 PROFESSIONAL ENGINEER/GEOLOGIST ........................................................................................................ $295.00

SUPERVISING FIELD ENGINEER/GEOLOGIST ............................................................................................... $265.00 (Includes Deputy Grading Inspector)
SENIOR FIELD ENGINEER/SENIOR FIELD GEOLOGIST ............................................................................... $205.00 LEAD FIELD TECHNICIAN ................................................................................................................................... $185.00 FIELD TECHNICIAN $175.00 DRAFTING/CAD ..................................................................................................................................................... $155.00 LABORATORY TESTING ........................................................................................................................................ $140.00 CLERICAL .................................................................................................................................................................. $140.00 COURT APPEARANCES AND DEPOSITIONS (4 hour minimum) ................................................................. $750.00

EXPENSES

FIELD SERVICE TRIP CHARGE .................................................................................................................. $170.00/visit MILEAGE (from office to destination and return; excludes field service trips) .........................................$0.92/mile REPRODUCTION .............................................................................................................................................. Cost + 22% SUBCONTRACTED EQUIPMENT .................................................................................................................. Cost + 22% (Drill Rig, Backhoe, Unskilled Labor, Consultants, and Deputy Inspectors, etc.)

TRAVEL EXPENSES, SUBSISTENCE, VEHICLE RENTAL,
FREIGHT, OTHER OUTSIDE EXPENSES .................. ..................................................................... Cost + 22%

FIELD SERVICE CONDITIONS

MINIMUM FEE FOR FIELD SERVICES ....................................................................................................... $760.00/trip OVERTIME - After 8 working hours per day & Saturday s ............................................................... 1-1/2 time - After 12 working hours, Sundays & Holidays ... ..................................................... Double Time (Four-hour minimum charge on weekends & holidays )

FIELD SERVICES will be billed at Field Technician, Senior Field Engineer or Supervising Field Engineer rate, depending on manpower availability and/or experience required due to complexity of project. Occasional site visits by the responsible Project/Senior/ Geotechni cal Engineer or Engineering Geologist may be requir ed to check on progress or to answer technical questions that arise.

FEES ARE DUE AND PAYABLE ON PRESENTATION OF INVOICE . R. T. FRANKIAN & ASSOCIATES reserves the right to charge the maximum legal inte rest on unpaid balance and collection fees, if requ ired, to secure payment. ‡-23

YAMASAKI LANDSCAPE ARCHITECTURE
1223 High Street Auburn, CA 95603 | 530.885.0040 | yamasaki-la.com

April 11, 2024

Jackie Lillio
City of Santa Clarita
23920 Valencia Boulevard
Santa Clarita, CA 91355

SUBJECT: VISTA CNAYON BRIDGE CONSTRUCTION SUPPORT

Dear Jackie:

Yamasaki Landscape Architecture is pleased to provide this proposal for landscape consultant services for the Vista Canyon Bridge project in Santa Clarita, CA.

Description of Project:

This proposal includes fees for construction support and administration.

Description of Services:

Construction Administration

1. Assist with bid documentation.

2. Respond to contractor questions and RFIs.

3. Review contractor submittals and change orders.

4. Attend virtual construction meetings.

5. Conduct one site visit at the end of construction to inspect the irrigation and plant material and provide a punch list of items to be completed.

6. Review and approve record drawings.

Fees:

Services for this project will be billed as a fixed fee of $15,000.00

Services Not Included:

1. Revisions to the approved drawings upon commencement of construction.

2. Landscape Soil Analysis
Jackie Lillio

VC BRIDGE
April 11, 2024

Page 2 ends

YAMASAKI LANDSCAPE ARCHITECTURE
1223 High Street Auburn, CA 95603 | 530.885.0040 | yamasaki-la.com

The above services, if requested, may be completed as additional services, as well as the following items: construction kickoff meeting, additional design time or services other than those defined above, additional meetings, or construction administration. Delivery and reproduction charges will be billed at cost.

Hourly Rates:

Principal $240.00 Landscape Designer $150.00
Landscape Architect $185.00 Administrative $95.00

If this proposal meets with your approval, please sign below, and return a copy to us. Please feel free to call if you have any questions or concerns regarding this proposal.

Sincerely,

Jeff Ambrosia, ASLA, LEED AP
President
CA Lic. # 4057

___________________________
Approved by: Date:

_____________________________________
Printed Name: