Attachment C
Air Quality Study
1.f
Packet Pg. 147
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
CARLSBAD
CLOVIS
IRVINE
LOS ANGELES
PALM SPRINGS
POINT RICHMOND
RIVERSIDE
ROSEVILLE
SAN LUIS OBISPO
3210 El Camino Real, Suite 100, Irvine, California 92602 949.553.0666 www.lsa.net
MEMORANDUM
DATE: August 23, 2023
TO: Robert Neman, Harvard 826 Property LLC
FROM: Ronald Brugger, Senior Air Quality Specialist
SUBJECT: Air Quality and Greenhouse Gas Emissions Impact Analysis Memorandum for the proposed Promenade Flats Project in Santa Clarita, California
INTRODUCTION
This air quality and greenhouse gas (GHG) emissions impact analysis for the proposed Promenade Flats Project at 26135 Bouquet Canyon Road in Santa Clarita, California (project) has been prepared using methods and assumptions recommended in the South Coast Air Quality Management District’s (SCAQMD) CEQA Air Quality Handbook (SCAQMD 1993). This analysis includes a description of existing re
gulatory framework, an assessment of project operational air quality emissions, and an assessment of GHG emissions. Measures to reduce or eliminate significant impacts are identified, where appropriate. All references cited in the memorandum are included in Attachment A.
Project Location
The project site is located along the west side of Bouquet Canyon Road, north of Magic Mountain Parkway and south of Cinema Drive at (Assessor’s Parcel Number 2811‐003‐018), 26135 Bouquet Canyon Road in the community of Valencia. The project site has a Mixed‐Use Corridor (MXC) zoning designation. Figure 1 shows the project location (all figures are in Attachme nt B).
Project Description
The proposed project would remove a portion of the existing parking lot to accommodate a new four‐story, mixed‐use building on 1.2 acres. The proposed project would include a total of 15,741.50 square feet (sf) of commercial use consisting of a 7,266.10 sf first‐floor retail space, a 3,027.40 sf rooftop yoga studio, and the exi
sting 5,448 sf International House of Pancakes (IHOP) restaurant. In addition to the new commercial uses, the proposed building would include four live/work units and 26 one‐bedroom units on floors two through four. A new 14,359 sf (0.33 acre) parking lot would be constructed on an adjacent vacant parcel to offset the parkin g that would be removed as part of the project. Construction of the proposed project would start in January 2024 and would be completed in approximately 12 months. Figure 2 shows the site plan. Project traffic is described in the Transportation Memorandum (LSA 2022).
Land Uses in the Project Vicinity
Land uses surrounding the proposed building include the Las Flores Apartments and the Global Prep Academy to the west of the project site. The new parking lot would be just south of the Las Flores
1.f
Packet Pg. 148
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 2 Apartments. Otherwise, there are commercial uses to the north, east, and south. Bouquet Canyon Road and the Metrolink rail are located east of the project.
Climate/Meteorology
Air quality in the planning area is affected not only by various emission sources (e.g., mobile and industry) but also by atmospheric conditions (e.g., wind speed, wind direction, temperature, and rainfall). The combination of topography, low mixing height, abundant sunshine, and emissions from the second‐largest urban area in the United States gives the South Coast Air Basin (Basin) some of the worst air pollution problems in the nation.
The Santa Clarita Valley is surrounded by the Santa Susana and San Gabriel mountain ranges on the south, east and west, and the Sierra Pelona Mountains on the north. The Valley lies in a transitional microcli
matic zone of the Basin between the “valley marginal” and “high desert” climate types.
Situated far enough from the ocean to escape coastal influences, the Valley’s climate is generally mild with hot summers and sunny, warm winters. Average annual precipitation is about 13 inches, usually received between November and March, alth ough some mountain areas south of the Valley may receive up to 24 inches of precipitation per year.
However, transport of the pollution that is emitted in the southern parts of the Basin and in the San Fernando Valley gets transported by onshore winds up through the Newhall Pass up toward th e Santa Clarita Valley results in high levels of ground‐level ozone every summer. Though Santa Clarita sits between two of the largest pollution areas, Los Angeles and Bakersfield, most of the air quality readings for the Santa Clarita Valley range between 58 to 78 percent below the state average.
REGULATORY FRAMEWORK
Air quality and GHG standards and the regulatory framework are discussed below.
Federal Regulations
Pursuant to the federal Clean Air Act (CAA) of 1970, the United States Environmental Protection Agency (EPA) established the National Ambient Air Quality Standards (NAAQS). The NAAQS were established for six major pollutants, termed “criteria” pollutants. Criteria pollutants are defined as those pollutants for which the federal and State governments have established AAQS, or cri teria, for outdoor concentrations to protect public health.
The EPA has designated the Southern California Association of Governments (SCAG) as the Metropolitan Planning Organization responsible for ensuring compliance with the requirements of the CAA for the Basin.
The United States has historically had a voluntary approach to reducing GHG emissions; however, on April 2, 2007, the United Stat
es Supreme Court ruled that the EPA has the authority to regulate carbon dioxide (CO2) emissions under the CAA. The Supreme Court ruled that GHGs fit within the CAA’s definition of a pollutant and that the EPA did not have a valid rationale for not regulating GHGs. In December 2009, the EPA issued an endangerment finding for GHGs under the CAA.
1.f
Packet Pg. 149
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 3 On December 7, 2009, the EPA Administrator signed a final action under the CAA, finding that six GHGs (i.e., CO2, methane [CH4], nitrous oxide [N2O], hydrofluorocarbons [HFCs], perfluorocarbons [PFCs], and sulfur hexafluoride [SF6]) constitute a threat to public health and welfare and that the combined emissions from motor vehicles cause and contribute to global climate change (GCC).
Multistate
The Western Regional Climate Action Initiative
The Western Regional Climate Action Initiative is a partnership among seven states including California and four Canadian provinces to implement a regional, economy‐wide cap‐and‐trade system to reduce global warming pollution. The Western Regional Climate Action Initiative will cap GHG emissions from the region’s electr icity, industrial, and transportation sectors with the goal to reduce the heat trapping emissions that cause global warming to 15% below 2005 levels by 2020.
When the Western Regional Climate Action Initiative adopted this goal in 2007, it estimated this would require 2007 levels to be reduced worldwide between 50% and 85% by 2050. California is working closely with the other states and provinces to design a regional GHG re duction program
that includes a cap‐and‐trade approach.
The California Air Resources Board (CARB) has implemented a cap‐and‐trade program that is also intended to link California and the other member st ates and provinces. The cap‐and‐trade regulation, which is a key element of California’s climate plan, took effect in January 2012 and compliance obligation began in January 2013. The cap‐and‐trade program sets a statewide limit on sources responsible for 85% of California’s GHG emissions and establishes a pric e signal needed to drive long‐term investment in cleaner fuels and more efficient use of energy. As of January 1, 2014, California’s cap‐and‐trade program is linked to Quebec’s pursuant to the Agreement Between the CARB and the Gouvernement du Québec Concerning the Harmonization and Integration of Cap‐ and‐ Trade Programs Reducing Greenhouse Gas Emissions, in accordance with the direction in CARB Board Resolution 13‐7 (CARB 2013). As of January 1, 2018, California’s cap‐and‐trade program and Québec’s program linked with Ontario’s cap‐and‐trade program. However, on July 3, 2018, the Ontario government revoked its cap‐and‐trade regulation. With On tario’s withdrawal from the linked program, California and Québec will work together to ensure that the environmental integrity and stringency of the cap‐and‐trade program/market is sustained (CARB n.d.‐a).
The program is designed to provide covered entities the flexibility to seek out and implement the lowest‐
cost options to reduce emissions. The first phase of the cap‐and‐trade regulation included electricity generated in and imported into California, large combustion sources (i.e., generally those emitting more than 25,000 metric tons [MT] of carbon dioxide equivalent [CO2e] per year), and certain industrial sectors. The second phase added providers of transportation fuels and other combustion fuels (e.g., natural gas, propane) to the cap‐and‐trade program. The regulation requires that emissions generated by these facilities and combustion of fuels be reduced over time under a declining cap.
Pacific Coast Action Plan on Climate and Energy
On October 28, 2013, the Governors of California, Oregon, and Washington and the Premier of British Columbia signed a clean energy pact, known as the Pacific Coast Action Plan on Climate and Energy. Although the Pacific Coast Action Plan does not impose legally enforceable obligat ions and
1.f
Packet Pg. 150
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 4 lacks a specific schedule for implementation, the pact sets out a number of goals and aspirational measures. The Pacific Coast Action Plan calls upon each of the parties to undertake a number of measures to address the use of carbon‐based fuels in the transportation sector, including the adoption or maintenance of low ‐carbon fuel standards, the development of targets and action plans in order to encourage public and private investment in low‐carbon commercial fleets that use alternative fields, and the expansion of the sale of zero‐emissions vehicles to a goal of 10% of new vehicle purchases by 2016.
California Air Resources Board
In 1967, the State Legislature passed the Mulford‐Carrell Act, which combined two Department of Health bureaus (i.e., the Bureau of Air Sanitation and the Motor Vehicle Pollution Control Board) to establish CARB. Since its formation, CARB has worked with the public, the business sector, and local governments to find solutions to the Stat e’s air pollution problems. California adopted the California Clean Air Act (CCAA) in 1988. CARB administers the California Ambient Air Quality Standards (CAAQS) for the 10 air pollutants designated in the CCAA. These 10 State air pollutants are the 6 criteria pollutants designated by the federal CAA as well as 4 others: visibility‐reduci ng particulates, hydrogen sulfide (H2S), sulfates, and vinyl chloride.
The California Global Warming Solutions Act of 2006, widely known as Assembly Bill (AB) 32, requires CARB to develop and enforce regulations for the reporting and verification of statewide GHG emissions. CARB was directed to set a statewide GHG emissions limit and set a timeline for adopting a scoping plan for
achieving GHG reductions in a technologically and economically feasible manner.
The heart of the bill is the requirement that statewide GHG emissions be reduced to 1990 levels by 2020. The bill requires CARB to adopt rules and regulations in an open public process to achieve the maximum
technologically feasible and cost‐effective GHG reductions.
In 2016, the Legislature passed and Governor Jerry Brown signed, Senate Bill (SB) 32 and AB 197.
SB 32 affirms the importance of addressing climate change by codifying into statute the GHG emissions reductions target of at least 40 percent below 1990 levels by 2030 contained in Go vernor Brown’s April 2015 Executive Order (EO) B‐30‐15. SB 32 builds on AB 32 and keeps California on the path toward achieving the State’s 2050 objective of reducing emissions to 80 percent below 1990 levels, consistent with an Intergovernmental Panel on Climate Change (IPCC) analysis of the emissions trajectory that would stabilize atmospheric GHG con centrations at 450 parts per million
(ppm) CO2e and reduce the likelihood of catastrophic impacts from climate change (IPCC 2023). The companion bill to SB 32, AB 197, provides additional direction to CARB related to the adoption of strategies to reduce GHG emissions.
CARB adopted the 2022 Scoping Plan Update on December 15, 2022. The 2022 Scoping Plan Update assesses progress toward the statutory
2030 target, while laying out a path to achieving carbon neutrality no later than 2045. The 2022 Scoping Plan Update focuses on outcomes needed to achieve carbon neutrality by assessing paths for clean technology, energy deployment, natural and working lands, and others and is designed to meet th e State’s long‐term climate objectives and support a range of economic, environmental, energy security, environmental justice, and public health priorities. Appendix D of the Scoping Plan includes information about project attributes that
1.f
Packet Pg. 151
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 5 would reduce operational GHG emissions and accommodate growth in a manner consistent with State GHG reduction and equity prioritization goals.
Although the 2022 Scoping Plan does not impose any specific mandates or policies that specifically apply to individual development projects such as the proposed project, the Scoping Plan encourages local municipalities to upd ate building codes and establish sustainable development practices for accommodating future growth. Key policies that involve the residential and commercial building sectors that are indirectly applicable to the proposed Project include the implementation of SB 275 (promoting infill development and high‐density housing in high quality transit areas), implementing green building practices (i.e., the California Gre
en Building Standards Code), energy efficiency and
water conservation policies, and waste diversion efforts.
Senate Bill 97 and CEQA Guidelines
In August 2007, the Legislature adopted SB 97, requiring the Office of Planning and Research (OPR) to prepare and transmit new California Environmental Quality Act (CEQA) gui delines for the mitigation of GHG emissions or the effects of GHG emissions to the California Natural Resources Agency. OPR submitted its proposed guidelines to the Secretary for Natural Resources on April 13, 2009, and the CEQA Guidelines amendments were adopted on December 30, 2009 and became effective on March 18, 2010.
The CE
QA Guidelines amendments do not specify a threshold of significance for GHG emissions or prescribe assessment methodologies or specific mitigation measures. Instead, the amendments encourage lead agencies to consider many factors in performing a CEQA analysis but rely on the lead agencies in making their own significance deter minations based upon substantial evidence. The CEQA Guidelines amendments also encourage public agencies to make use of programmatic mitigation plans and programs from which to tier when they perform individual project analyses.
The CEQA Guidelines amendments require a lead agency to make a good‐faith effort based on the extent possible on scie ntific and factual data to describe, calculate or estimate the amount of GHG emissions resulting from a project. The CEQA Guidelines amendments give discretion to the lead agency whether to (1) use a model or methodology to quantify GHG emissions resulting from a project and which model or methodology to use and/or (2) rely on a qualitati ve analysis or performance‐based standards. The California Natural Resources Agency is required to periodically update the guidelines to incorporate new information or criteria established by CARB pursuant to AB 32.
California Green Building Standards
The California Green Building Standards Code, which is Part 11 of the California Code of Regu lations, is commonly referred to as the CALGreen Code. The first edition of the CALGreen Code was released in 2008 and contained only voluntary standards. The 2022 CALGreen Code was updated in 2022, became effective on January 1, 2023, and applies to non‐residential and r esidential developments.
The CALGreen Code contains requirements for construction site selection, stormwater control during construction, construction waste reduction, indoor water use reduction, material selection, natural resource conservation, site irrigation conservation, and more. The CALGreen Code provides for design options allowing the designer to determine how best to achieve compliance for a given site or building condition. The CAL
Green Code also requires building commissioning, which is a
1.f
Packet Pg. 152
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 6 process for the verification that all building systems, such as heating and cooling equipment and lighting systems, function at their maximum efficiency. The proposed project would be subject to the 2022 CALGreen Code that became effective on January 1, 2023. Requirements of the 2022 CALGreen Code that are applicable to the proposed project inc lude the following:
4.106.4 Electric Vehicle (EV) charging. New construction shall comply with Section 4.106.4.1 or 4.106.4.2 to facilitate future installation and use of EV chargers. Electric vehicle supply equipment (EVSE) shall be installed in accordance with the California Electrical Code, Article 625.
4.303.1 Water Conserving Plumbing Fixtures and Fittings. Al l water fixtures shall comply with the California Code of Regulations, Title 20, (Appliance Efficiency Regulations), Section 1605.1(h)(4) and Section 1605.3(h)(4)(A).
4.304.1 Outdoor Potable Water Use in Landscape Areas. Residential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources’ Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent.
4.408.1 Construction Waste Management. Recycle and/or salvage for reuse a minimum of 65 percent of the nonhazardous construction and demolition waste in accordance with Section 5.408.1.1, 5.408.1.2, or 5.408.1.3, or meet the City’s construction and demolition waste management ordinance, whichever is more stringent.
4.410.2 Recycling by Occupan
ts. Where 5 or more multifamily units are constructed on a building site, provide readily accessible areas that serve all buildings on the site and are identified for the depositing, storage, and collection of non‐hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waste, and metals, or meet the City’s local recycling ordinance, whichever is more restrictive.
Regional Air Quality Planning Framework
SCAG is a council of governments for Imperial, Los Angeles, Orange, Riverside, San Bernardino, and Ventura Counties. SCAG is a regional planning agency and a forum for regional issues relating to transportation, the economy and community development, and the environment. Although SCAG is not an air quality management agency, it is responsible for devel oping transportation, land use, and energy conservation measures that affect air quality.
On September 3, 2020, the Regional Council of SCAG adopted Connect SoCal, also known as the 2020–2045 Regional Transportation Plan/Sustainable Communities Strategy: A Plan for Mobility, Accessibility, Sustainability, and High Quality of Life (a.k.a., 2020–2045 RTP/SCS). The 2020–2 045 RTP/SCS is a long‐range visioning plan that balances future mobility and housing needs with economic, environmental and public health goals. Connect SoCal embodies a collective vision for the region’s future and is developed with input from local governments, county transportation commissions (CTCs), tribal governments, non‐profit organizations, businesses and local stakeholders within th
e counties of Imperial, Los Angeles, Orange, Riverside, San Bernardino and Ventura.
1.f
Packet Pg. 153
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 7 South Coast Air Quality Management District
The SCAQMD is the agency principally responsible for comprehensive air pollution control in the Basin. To that end, the SCAQMD, a regional agency, works directly with SCAG, county transportation commissions and local governments, and cooperates actively with State and federal government agencies. The SCAQMD develops air quality‐related rules and regulations, establishes permitting requirements, inspects emissions sources, and provides regulatory enforcement through such measures as educational programs or fines, when necessary.
Regional Air Quality Management Plan
SCAQMD and SCAG are responsible for formulating and implementing the Air Quality Management Plan (AQMP) for the Basin. The main purpose of an AQ MP is to bring the area into compliance with federal and State air quality standards. SCAQMD prepares a new AQMP every 3 years, updating the previous plan and a 20‐year horizon.
The latest plan is the 2022 AQMP (SCAQMD 2022), adopted December 2, 2022. On October 1, 2015, the EPA
strengthened the NAAQS for ground‐level ozone, lowering the primary and secondary ozone standard levels to 70 parts per billion (ppb). The Basin is classified as an “extreme” nonattainment area. The 2022 AQMP was developed to address the requirements for meeting this standard. SCAQMD adopts rules and regulations to i mplement portions of the AQMP. Several of these rules may apply to project construction or operation. For example, SCAQMD Rule 403 requires the implementation of the best‐available fugitive dust control measure during active construction periods capable of generating fugitive dust emissions from on‐site earth‐moving activities, construction/d
emolition activities, and construction equipment travel on paved and unpaved roads.
Although SCAQMD is responsible for regional air quality planning efforts, it does not have the authority to directly regulate the air quality issues associated with new development projects within the Basin, such as the proposed project. Instead, SCAQMD published the CEQA Air Quality H andbook (SCAQMD 1993) to assist lead agencies, as well as consultants, project proponents, and other interested parties in evaluating potential air quality impacts of projects proposed in the Basin. The CEQA Air Quality Handbook provides standards, methodologies, and procedures for conducting air quality analyses in Environmental Impact Report s and was used extensively in the preparation of this analysis. SCAQMD is currently in the process of replacing the CEQA Air Quality Handbook (1993) with the Air Quality Analysis Guidance Handbook (SCAQMD n.d.).
To assist the CEQA practitioner in conducting an air quality analysis in the interim while the replacement Air Quality Analysis Guidance Han
dbook is being prepared, supplemental guidance/
information is provided on the SCAQMD website and includes (1) on‐road vehicle emission factors, (2) background carbon monoxide (CO) concentrations, (3) localized significance thresholds (LSTs), (4) mitigation measures and control efficiencies, (5) mobile‐source toxics analysis, (6) off‐road mobile‐ source emission factors, (7) particulat
e matter less than 2.5 microns in size [PM2.5] significance thresholds and calculation methodology, and (8) updated SCAQMD Air Quality Significance Thresholds. SCAQMD also recommends using approved models to calculate emissions from land use projects, such as the California Emissions Estimator Model (CalEEMod). These recommendations were followed in the preparation of this analysis.
The following SCAQMD rules and regulations would apply to th e proposed project:
1.f
Packet Pg. 154
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 8 SCAQMD Rule 403 (SCAQMD 2005) requires projects to incorporate fugitive dust control measures.
SCAQMD Rule 1113 (SCAQMD 2016) limits the volatile organic compound (VOC) content of architectural coatings.
Local Regulations
City of Santa Clarita General Plan
Local jurisdictions, such as the City of Santa Clarita, have the authority and responsibility to reduce air pollution through their police power and decision‐making authority. Specifically, the City is responsible for the assessment and mitigation of air emissions resulting from its land use decisions.
The City is also responsible for impl
ementation of the transportation control measures in the AQMP, such as bus turnouts, energy‐efficient streetlights, and synchronized traffic signals.
The Conservation and Open Space Element of the City of Santa Clarita General Plan has identified goals, objectives, and policies aimed at greenhouse gas reduction at the citywid e level (City of Santa Clarita 2011).
City of Santa Clarita Climate Action Plan
The City developed and published its Final Climate Action Plan (CAP) in August 2012. The CAP, part of the General Plan, serves as a component of the general plan document for the City to address GHG
emissions. Using the goals, objectives, and policies of the General Plan as a starting point, the CAP identifies mitigation measures that can be quantified and translated into significant reductions in the GHG emissions by the year 2020. Measures identified in the City’s CAP will not only meet but exceed the State’s Glob al Warming Solutions Act of 2006 (AB 32) GHG emission reduction mandate (City of Santa Clarita 2012).
The CAP defines a local threshold of significance for GHG emissions for project level submittals that trigger review by CEQA. Because goals, objectives, and policies approved under the General Plan are forecast to meet the GHG emission reduction target
s mandated by AB 32, development projects
that are able to demonstrate consistency with the General Plan and zoning ordinance will by association demonstrate consistency with the CAP. However, because the CAP is only certified through 2020 it is not utilized for CEQA streamlining in this analysis.
THRESHOLDS OF SIGNIFICANCE
Certain air districts (e.g., SCAQMD) have created guidelines and requirements to conduct air quality analyses. SCAQMD’s current guidelines, the CEQA Air Quality Handbook (SCAQMD 1993) with associated updates, were followed in this assessment of air quality and climate impacts for the proposed project.
Based on the State CEQA Guidelines, Appendix G (Public Resource s Code Sections 15000–15387), a project would normally be considered to have a significant effect on air quality if the project would violate any CAAQS, contribute substantially to an existing air quality violation, expose sensitive receptors to substantial pollutants concentrations, or conflict with adopted environmental plans and goals of the community in which it is located.
1.f
Packet Pg. 155
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 9 Pollutants with Regional Effects
SCAQMD has established daily emissions thresholds for construction and operation of a proposed project in the Basin. The emissions thresholds were established based on the attainment status of the Basin with regard to air quality standards for specific criteria pollutants. Because the concentration standards were set at a level that protects public healt h with an adequate margin of safety (SCAQMD 2022), these emissions thresholds are regarded as conservative and would overstate an individual project’s contribution to health risks. Table 1 lists the CEQA significance thresholds for construction and operational emissions established for the Basin.
Table 1: Regional Thresholds for Construction and Operational Emissions Emissions Source Pollutant Emissions Thresholds (lbs/day) VOCs NOX CO PM10 PM2.5 SOX
Construction 75 100 550 150 55 150
Operations 55 55 550 150 55 150
Source: South Coast AQMD Air Quality Significance Thresholds (SCAQMD 2019).
CO = carbon monoxide
lbs/day = pounds per day
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
SCAQMD = South Coast Air Quality Management District
SOX = sulfur oxides
VOCs = volatile organic compounds
Projects in the Basin with construction‐ or operation‐related emissions that exceed any of their respective emission thresholds would be considered significant under SCAQMD guidelines. These thresholds, which SCAQMD developed and which apply throughout the Basin, apply as both project and cumulative thresholds. If a project exceeds these standards, it is considered to have a projec t‐ specific and cumulative impact.
Localized Impacts Analysis
SCAQMD published its Final Localized Significance Threshold Methodology in June 2003 and updated it in July 2008 (SCAQMD 2008), recommending that all air quality analyses include an assessment of both construction and operational impacts on the air quality of nearby sensitive receptors. LSTs represent the maximum emissions from a project site that are not expe cted to result in an exceedance of the NAAQS or the CAAQS for CO, nitrogen dioxide (NO2), particulate matter less than 10 microns in size (PM10), and PM2.5. LSTs are based on the ambient concentrations of that pollutant within the project’s Source Receptor Area (SRA) and the distance to the nearest sensitive receptor.
For this project, the appropriate SRA is the Santa Clarita Valley area (SRA 13). Sensitive receptors include residences, schools, hospitals, and similar uses that are sensitive to adverse air quality. As described above, the closest sensitive receptors are the Las Flores Apartments, which are approximately 80 feet (ft) from the west boundary of the building construction and approximately 45 ft from the north boundary of the parking lot construction.
If the total acreage disturbed is less than or equal to 5 acres (ac) per day, then the SCAQMD’ s screening look‐up tables can be used to determine if a project has the potential to result in a significant impact. The project site is approximately 1.2 ac and the parking lot is 0.43 ac. The emissions from the larger site would be greater than the s maller and the minimum distance the LST
1.f
Packet Pg. 156
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 10 methodology is designed to assess is 25 meters (or 80 ft). Therefore, 1.2 ac LSTs at 80 ft distance (derived by interpolation) were used for construction emissions from both sites.
Table 2 lists the emissions thresholds that apply during project construction.
Table 2: SCAQMD Localized Significance Thresholds
Emissions Source Category Pollutant Emissions (lbs/day) NOX CO PM10 PM2.5
Construction (1.2 ac, 80 ft distance) 124 647 4 3
Source: Final Localized Significance Threshold Methodology (SCAQMD 2008). ac = acre
CO = carbon monoxide
ft = feet
lbs/day = pounds per day
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
SCAQMD = South Coast Air Quality Management District
Greenhouse Gas Emissions
State CEQA Guidelines Section 15064(b) provides that the “determination of whether a project may have a significant effect on the environment calls for careful judgment on the part of the public agency involved, based to the extent possible on scientific and factual data”, and further states that an “ironclad definition of significant eff ect is not always possible because the significance of an activity may vary with the setting.”
Appendix G of the State CEQA Guidelines includes significance thresholds for GHG emissions. A project would normally have a significant effect on the environment if it would do either of the following:
Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment; or
Conflict with an applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs.
Currently, there is no statewide GHG emissions threshold that has been used to determine the potential GHG emissions imp
acts of a project. Threshold methodology and thresholds are still being developed and revised by air districts in California.
As described above, the City published its Final CAP in August 2012. The CAP identified measures to support meeting the 2020 GHG emissions goals. However, since the CAP hasn’t been u pdated to be consistent with State goals detailed in SB 32, EO B‐30‐15, and EO S 3‐05 to reduce GHG emissions by 40 percent below 1990 levels by 2030, the SCAQMD threshold described below was used.
To provide guidance to local lead agencies on determining significance for GHG emissions in their CEQA documents, SCAQMD convened a GHG CEQA Significance Threshold Working Group (Working Group) in 2008. This Working Group proposed a tiered approach for evaluating GHG emissions for development projects where SCAQMD is not the lead agency. The applicable tier for this project is Tier 3, which states that if GHG emissions are less than 3,000 MT CO2e per year, project‐level and cumulative GHG emissions would be less than significant.
1.f
Packet Pg. 157
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 11 IMPACTS AND MITIGATION MEASURES
Emissions would include criteria air pollutants and GHG emissions. The sections below describe the proposed project’s consistency with applicable air quality plans, estimated project emissions, and the significance of impacts with respect to SCAQMD thresholds.
Air Quality Impacts
Consistency with Applicable Air Quality Plans
A consistency determination plays an essential role in local‐agency project review by linking local planning and unique individual projects to the air quality plans. A consistency determination fulfills the CEQA goal of fully informing local‐agency decision‐makers of the environmental costs of the project under consideratio
n at a stage early enough to ensure that air quality concerns are addressed. Only new or amended General Plan elements, Specific Plans, and significantly unique projects need to undergo a consistency review due to the air quality plan strategy being based on projections from local General Plans.
The AQMP is based on regional growth projections developed by SCAG. The proposed project is a mixed‐use development that would not house more than 1,000 persons, occupy more than 40 ac of land, or encompass more than 650,000 sf of floor area. Thus, the proposed project would not be defined as a regionally significant project un der CEQA; therefore, it does not meet SCAG’s Intergovernmental Review criteria.
The proposed land use is consistent with the General Plan zoning. Thus, the proposed project, as analyzed, would result in air emissions that are consistent with the City’s plans. The City’s General Plan is consistent with the SCAG Regional Comprehe nsive Plan Guidelines and the SCAQMD AQMP.
Pursuant to the methodology provided in Chapter 12 of the 1993 SCAQMD CEQA Air Quality Handbook, consistency with the Basin 2016 AQMP is affirmed when a project would not increase the frequency or severity of an air quality standards violation or cause a new violation, and is consistent with the growth assumptions in the AQMP. Consistency review is presented as follows:
1. The project would result in short‐term construction and long‐term operational pollutant emissions that are all less than the CEQA significance emissions thresholds established by SCAQMD, as demonstrated above. Ther efore, the project would not result in an increase in the frequency or severity of an air quality standard violation or cause a new air quality standard violation.
2. The CEQA Air Quality Handbook (SCAQMD 1993) indicates that consistency with AQMP growth assumptions must be analyzed for new or amended General Plan elements, Specific Plans, and significant projects. Significant projects include airports, electricity‐generating facilities, petroleum and gas refineries, designation of oil‐drilling districts, water ports, solid‐waste disposal sites, and offshore‐drilling facilities; therefore, as a small coffee shop, the proposed project is not defined as significant.
Based on the consistency an
alysis presented above, the proposed project would be consistent with the regional AQMP.
1.f
Packet Pg. 158
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 12 Criteria Pollutant Analysis
The Basin is designated as non‐attainment for ozone (O3) and PM2.5 for federal standards and non‐ attainment for O3, PM10, and PM2.5 for State standards. The SCAQMD’s nonattainment status is attributed to the region’s development history. Past, present, and future development projects contribute to the region’s adverse air quality impacts on a cumulative basis. By its very nature, air pollution is largely a cumulative impact. No single project is sufficient in size to, by itself, result in nonattainme
nt of ambient air quality standards. Instead, a project’s individual emissions contribute to existing cumulatively significant adverse air quality impacts. If a project’s contribution to the cumulative impact is considerable, then the project’s impact on air quality would be considered significant.
In developing thresholds of significance for air pollutants, th e SCAQMD considered the emission levels for which a project’s individual emissions would be cumulatively considerable. If a project exceeds the identified significance thresholds, its emissions would be cumulatively considerable, resulting in significant adverse air quality impacts to the region’s existing air quality conditions.
Construction Emissions. Construction activities prod uce combustion emissions from various sources (utility engines, tenant improvements, and motor vehicles transporting the construction crew). Exhaust emissions from construction activities envisioned on site would vary daily as construction activity levels change.
The construction analysis includes estimating the construction equipment that would be used during each construction activity, the hours of use for that construction equipment, the quantities of earth and debris to be moved, and the on‐road vehicle trips (e.g., worker, soil‐hauling, and vendor trips).
The proposed demolition of the existing 10,645 sf parking lot was estimated by assuming the pavement is 145 pounds per sf, resulting in 772 tons of material to haul. The proposed earthwork for the project assumes th
e site would be balanced (no import or export needed). CalEEMod defaults are assumed for the construction activities, off‐road equipment, and on‐road construction fleet mix and trip lengths. It is expected that construction would start in January 2024 and finish in approximately 16
months. Table 3 lists the tentative project construction schedule.
Table 3: Tentative Project Construction Schedule
Phase Name Phase Start
Date
Phase End
Date Number of Days
Demolition 1/2/2024 1/8/2024 5
Site Preparation 1/9/2024 1/10/2024 2
Grading 1/11/2024 1/16/2024 4
Building Construction 1/17/2024 11/19/2026 220
Paving 11/20/2024 1/2/2025 32
Architectural Coating 7/9/2024 12/10/2024 110
Source: Estimated by LSA Associates, Inc. from the project information provided (August 2023).
1.f
Packet Pg. 159
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 13 CalEEMod Version 2022.1 was used to develop the construction equipment inventory and calculate the construction emissions. Table 4 lists the estimated construction equipment that would be used during project construction as estimated by CalEEMod default values. The CalEEMod output is included as Attachment C.
Table 4: Diesel Construction Equipment Used by Construction Phase Construction Phase Off‐Road Equipment Type
Off‐Road
Equipment
Unit Amount
Hours Used
per Day Horsepower Load
Factor
Demolition
Concrete/Industrial Saws 1 8 33 0.73
Rubber Tired Dozers 1 8 367 0.40
Tractors/Loaders/Backhoes 3 8 84 0.37
Site Preparation
Graders 1 8 148 0.41
Rubber Tired Dozers 1 7 367 0.40
Tractors/Loaders/Backhoes 1 8 84 0.37
Grading
Graders 1 8 148 0.41
Rubber Tired Dozers 1 8 367 0.40
Tractors/Loaders/Backhoes 2 7 84 0.37
Building Construction
Cranes 1 6 367 0.29
Forklifts 1 6 82 0.20
Generator Sets 1 8 14 0.74
Tractors/Loaders/Backhoes 1 6 84 0.37
Welders 3 8 46 0.45
Paving
Cement and Mortar Mixers 1 6 10 0.56
Pavers 1 6 81 0.42
Paving Equipment 1 8 89 0.36
Rollers 1 7 36 0.38
Tractors/Loaders/Backhoes 1 8 84 0.37
Architectural Coating Air Compressors 1 6 37 0.48
Source: Compiled by LSA Associates, Inc. using CalEEMod defaults (August 2023).
CalEEMod = California Emissions Estimator Model
The emissions rates shown in Table 5 are from the CalEEMod output tables listed as “Mitigated Construction,” even though the only measures that have been applied to the analysis are the required construction emissions control measures, or standard conditions. They are also the combination of the on‐ and off‐site emissions and the greater of s ummer and winter emissions. No exceedances of any criteria pollutants are expected. Standard measures are documented in the CalEEMod output in Attachment C.
Fugitive Dust. Fugitive dust emissions are generally associated with land clearing and exposure of soils to the air and wind, as well as cut‐and‐fill grading operations. Dust gene rated during construction varies substantially on a project‐by‐project basis, depending on the level of activity, the specific operations, and weather conditions at the time of construction.
1.f
Packet Pg. 160
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 14 Table 5: Short‐Term Regional Construction Emissions
Construction Phase
Total Regional Pollutant Emissions (lbs/day)
VOCs NOX CO SOX Fugitive
PM10
Exhaust
PM10
Fugitive
PM2.5
Exhaust
PM2.5
Demolition 2 19 18 <1 3 1 1 1
Site Preparation 1 14 13 <1 3 1 1 1
Grading 2 16 16 <1 3 1 1 1
Building Construction 1 10 12 <1 <1 <1 <1 <1
Paving 1 5 7 <1 <1 <1 <1 <1
Architectural Coating 2 1 2 <1 <1 <1 <1 <1
Peak Daily 3 19 18 <1 4 2
SCAQMD Threshold 75 100 550 150 150 55
Exceeds Threshold? No No No No No No
Source: Compiled by LSA Associates, Inc. (August 2023).
Note: The application of architectural coatings was assumed to occur during both the Building Construction and Paving phases. All values shown are rounded to the nearest integer to correspond with the accuracy of the analysis.
CO = carbon monoxide
lbs/day = pounds per day
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
SCAQMD = South Coast Air Quality Management District
SOX = sulfur oxides
VOCs = volatile organic compounds
The construction calculations prepared for this project assumed that dust control measures (watering a minimum of two times daily consistent with SCAQMD Rule 403) would be employed to reduce emissions of fugitive dust during site grading. Furthermore, all construction would need to comply with SCAQMD Rule 403 regarding the emission of fugitive dust. Tabl e 5 lists total construction emissions (i.e., fugitive dust emissions and construction equipment exhausts) that have incorporated the following Rule 403 measures that would be implemented to significantly reduce PM10 emissions from construction:
Water active sites at least twice daily (locations where grading is to occur shall be thoroughly watered prior to earthmoving).
Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least 2 ft (0.6 meter) of freeboard (vertical space between the top of the load and the top of the trailer) in accordance with the requirements of California Vehicle Code Section 23114. Reduce traffic speeds on all unpaved roads to 15 miles per hour (mph) or less.
These Rule 403 measures were incorporated in the CalEEMod analysis.
Architectural Coatings. Architectural coatings contain VOCs that are part of the O3 precursors.
Based on the proposed project, it is estimated that application of the architectural coatings for the proposed peak construction day would result in a peak of 4 pounds per day (lbs/day) of VOCs. Therefore, VOC emissions from architectural‐coating application would not exceed the SCAQMD VOC threshold of 75 lbs/day.
Localized Impacts Analysis
. Table 6 shows the portion of the construction emissions that would be produced on the project sites compared to the LSTs. Table 6 shows that the localized construction emissions would not result in a locally significant air quality impact.
1.f
Packet Pg. 161
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 15 Table 6: Construction Localized Impacts Analysis
Emissions Sources Pollutant Emissions (lbs/day)
NOX CO PM10 PM2.5
On‐Site Emissions 16 16 1 1
LST 124 647 4 3
Exceeds Threshold? No No No No
Source: Compiled by LSA Associates, Inc. (August 2023).
Note: The SRA is Santa Clarita Valley, 1.2 ac, receptors at 80 feet. ac = acre
CO = carbon monoxide
lbs/day = pounds per day
LST = localized significance threshold
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
SRA = Source Receptor Area
Odors from Construction Activities. Heavy‐duty equipment in the project area during construction would emit odors, primarily from the equipment exhaust. However, the construction‐produced odors would cease to occur after individual construction is completed.
No other sources of objectionable odors have been identified for the proposed project, and no mitigation measures are r equired.
SCAQMD Rule 402 regarding nuisances states,
“A person shall not discharge from any source whatsoever such quantities of air contaminants or other material which cause injury, detriment, nuisance, or annoyance to any considerable number of persons or to the public, or which endanger the comfort, repose, health or safety of any such person s or the public, or which cause, or have a natural tendency to cause, injury or damage to business or property.”
The proposed uses are not anticipated to emit any objectionable odors. Therefore, objectionable odors posing a health risk to potential on‐site and existing off‐site uses would not occur as a result of the prop
osed project.
Naturally Occurring Asbestos. The proposed project site is in Los Angeles County, which is among the counties found to have serpentine and ultramafic rock in their soils (California Department of Conservation 2023). However, according to the California Geological Survey, no such rock has been
identified in the project vicinity. Therefore, the potential risk for naturally occurring asbestos during project construction is small and less than significant.
Construction Emissions Conclusions. Tables 5 and 6 show that daily regional construction emissions would not exceed the daily thresholds of any criteria pollutant emission thresh olds established by SCAQMD; thus, during construction, there would be no air quality impacts.
Operational Emissions
Long‐term air pollutant emission impacts are those associated with mobile sources (e.g., vehicle trips), energy sources (e.g., electricity and natural gas) and area sources (e.g., architectural coatings and the use of landscape maintenance equipmen t) related to the proposed project.
1.f
Packet Pg. 162
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 16 PM10 emissions result from running exhaust, tire and brake wear, and the entrainment of dust into the atmosphere from vehicles traveling on paved roadways. Entrainment of PM10 occurs when vehicle tires pulverize small rocks and pavement and the vehicle wakes generate airborne dust. The contribution of tire and brake wear is small compared to the other PM emission processes.
Gasoline‐powered engines have small rates of particulate matter emissions compared with diesel‐ powered vehicles. Project traffic is described in the Transportation Memorandum (LSA 2022).
Energy source emissions result from activities in buildings for which electricity and natural gas are used. The quantity of emissions is the product of usage intensity (i.e., the amount of electricity or natural gas) and the emission factor of the fuel source. Major sources of energy demand i nclude building mechanical systems, such as heating and air conditioning, lighting, and plug‐in electronics, such as refrigerators or computers. Greater building or appliance efficiency reduces the amount of energy for a given activity and thus lowers the resultant emissions. The emission factor is determined by the fuel source, with cleaner energy sources, like renewable energy, producing fewer emissions than conventional sources.
Typically, area source emissions consist of direct sources of air emissions located at the project site, including architectural coatings and the use of landscape maintenance equipment. Area source emissions associated with the project would include emissions from the use of la ndscaping equipment and the use of consumer products.
Emission estimates for operation of the project were calculated using CalEEMod and are shown in Table 7, below. The primary emissions associated with the project are regional in nature, meaning that air pollutants are rapidly dispersed on release. The peak daily emissions associated with project operations are id
entified in Table 7 for reactive organic gas (ROG), nitrogen oxides (NOx), CO, sulfur oxides (SOx), PM10, and PM2.5.
Table 7: Project Operation Emissions (Pounds per Day)
ROG NOx CO SOx PM10 PM2.5
Area Source Emissions 1 <1 2 <1 <1 <1
Energy Source Emissions <1 <1 <1 <1 <1 <1
Mobile Source Emissions 2 1 15 <1 3 <1
Total Project Emissions 3 2 15 <1 3 <1
SCAQMD Significance Threshold 55 55 550 150 55 150 Exceed Threshold? No No No No No No
Source: Compiled by LSA Associates, Inc. (August 2023).
CO = carbon monoxide
NOX = nitrogen oxides
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
ROG = reactive organic gas
SCAQMD = South Coast Air Quality Management District
SOX = sulfur oxides
The results shown in Table 7 indicate the project would not exceed the significance criteria for annual ROG, NOx, CO, SOx, PM10, and PM2.5 emissions; therefore, operation of the proposed project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in nonattainment under an applicable federal or State AAQS. The CalEEMod emission calculations sheets are included in Attachment C.
1.f
Packet Pg. 163
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 17 Objectionable Odors. The SCAQMD addresses odor criteria within the CEQA Handbook. The district has not established a rule or standard regarding odor emissions, rather, the district has a nuisance rule: “Any project with the potential to frequently expose members of the public to objectionable odors should be deemed to have a significant impa ct.”
The proposed project would not include any activities or operations that would generate objectionable odors. Therefore, the proposed project would not result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.
Greenhouse Gas Impacts
Generate Greenhouse Gas Emissions
This section discusses the project’s impacts related to the release of GHG emissions for the construction and operational phases of the project.
Construction Activities. Construction activities associated with maximum buildout would produce combustion emissions from various sources. During construction, GHGs would be emitted through the operation of construction equi pment and from worker and builder supply vendor vehicles, each of which typically use fossil‐based fuels to operate. The combustion of fossil‐based fuels creates GHGs such as CO2, CH4, and N2O. Furthermore, CH4 is emitted during the fueling of heavy equipment. Exhaust emissions from on‐site construction activities would vary daily as construction activity levels change.
The SCAQMD does not have an adopted threshold of significance for construction‐related GHG emissions. Based on SCAQMD guidance, construction emissions were amortized over 30 years (a typical project lifet ime) to be added to the total project operational emissions. Using CalEEMod, it is estimated that construction activities would generate approximately 278 metric tons of CO2e. Thus, the amortized annual construction emissions would be approximately 9 MT of CO2e per year.
Operational GHG Emissions. Long‐term GHG emissions are typically generated from mobile sources (e.g., cars, trucks and buses), area sources (e.g., maintenance activities and landscaping), indirect emissions from sources associated with energy consumption, waste sources (land filling and waste disposal), and water sources (water supply and conveyance, treatment, and distribution). Mobile‐ source GH
G emissions would include project‐generated vehicle and truck trips to and from the project. Area‐source emissions would be associated with activities such as landscaping and maintenance on the project site. Energy source emissions would be generated at off‐site utility providers as a result of increased el ectricity demand generated by the project. Waste source emissions generated by the proposed project include energy generated by land filling and other methods of disposal related to transporting and managing project generated waste. In addition, water source emissions associated with the proposed project are generated by water supply and conveyance, water treatm
ent, water distribution, and wastewater treatment.
As described above, this analysis evaluates potential operational emissions associated with the proposed project. Operational GHG emissions were estimated using CalEEMod and the results are presented in Table 8.
1.f
Packet Pg. 164
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 18 Table 8: Operational GHG Emissions
Emissions Source Category Operational Emissions (Metric Tons per Year) CO2 CH4 N2O CO2e
Area 1 <1 0 1
Energy 110 <1 <1 110
Mobile 520 <1 <1 529
Waste 4 <1 0 15
Water 4 <1 <1 6
Total Annual Operational Emissions 661
30‐Year Amortized Construction Emissions 9
Total Annual Effective Project Emissions 670
SCAQMD Tier 3 Threshold 3,000
Would the Project Exceed the Threshold? No
Source: Compiled by LSA Associates, Inc. (August 2023).
CH4 = methane
CO2 = carbon dioxide
CO2e = carbon dioxide equivalent
N2O = nitrous oxide
SCAQMD = South Coast Air Quality Management District
As shown in Table 8, the project would generate 670 metric tons of CO2e per year. This is less than SCAQMD’s Tier 3 threshold of 3,000 MT CO2e/yr.
Consistency with Greenhouse Gas Reduction Plans
The following discussion evaluates the proposed project according to the goals of the 2022 Scoping Plan, EO B‐30‐15, SB 32, and AB 197.
EO B‐30‐15 added the immediate target of reducing GHG emissions to 40 percent below 1990 levels by 2030. CARB released a sec ond update to the Scoping Plan, the 2017 Scoping Plan, to reflect the 2030 target set by EO B‐30‐15 and codified by SB 32. SB 32 affirms the importance of addressing climate change by codifying into statute the GHG emissions reductions target of at least 40 percent below 1990 leve
ls by 2030 contained in EO B‐30‐15. SB 32 builds on AB 32 and keeps us on the path toward achieving the State’s 2050 objective of reducing emissions to 80 percent below 1990 levels.
The companion bill to SB 32, AB 197, provides additional direction to the CARB related to the adoption of st
rategies to reduce GHG emissions. Additional direction in AB 197 intended to provide easier public access to air emissions data that are collected by CARB was posted in December 2016.
In addition, the 2022 Scoping Plan assesses progress toward the statutory 2030 target, wh ile laying out a path to achieving carbon neutrality no later than 2045. The 2022 Scoping Plan focuses on outcomes needed to achieve carbon neutrality by assessing paths for clean technology, energy deployment, natural and working lands, and others, and is designed to meet the State’s long‐term climate objectives and support a range of economic, environmental, energy security, environmental justice, and public health
priorities.
The 2022 Scoping Plan focuses on building clean energy production and distribution infrastructure for a carbon‐neutral future, including transitioning existing energy production and transmission infrastructure to produce zero‐carbon electricity and hydrogen, and utilizing biogas resulting from wildfire
management or landfill and dairy operations, among other substitutes. The 2022 Scoping Plan states that in almost all sectors, electrification will play an important role. The 2022 Scoping
1.f
Packet Pg. 165
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 19 Plan evaluates clean energy and technology options and the transition away from fossil fuels, including adding four times the solar and wind capacity by 2045 and about 1,700 times the amount of current hydrogen supply. As discussed in the 2022 Scoping Plan, EO N‐79‐20 requires that all new passenger vehicles sold in California will be zero‐emission by 2035, and all other fleets will ha ve
transitioned to zero‐emission as fully possible by 2045, which will reduce the percentage of fossil fuel combustion vehicles.
Energy efficient measures are intended to maximize energy efficiency building and appliance standards, pursue additional efficiency efforts includi ng new technologies and new policy and implementation mechanisms, and pursue comparable investment in energy efficiency from all retail providers of electricity in California. In addition, these measures are designed to expand the use of green building practices to reduce the carbon footprint of California’s new and existing inventory of buildings. As discussed above, the proposed project would compl y with the CALGreen Code,
regarding energy conservation and green building standards. Therefore, the proposed project would comply with applicable energy measures.
Water conservation and efficiency measures are intended to continue efficiency programs and use cleaner energy sources to move and treat water. In creasing the efficiency of water transport and reducing water use would reduce GHG emissions. As noted above, the project would comply with the CALGreen Code, which includes a variety of different measures, including reduction of wastewater and water use. In addition, the proposed project would be required to comply wit h the California Model Water Efficient Landscape Ordinance. Therefore, the proposed project would not conflict with any of the water conservation and efficiency measures.
The goal of transportation and motor vehicle measures is to develop regional GHG emissions reduction targets for passenger vehicles. Specific regional emission targets for transportation emissions would not directly apply to the proposed project. The second phase of Pavley standards will reduce GHG emissions from new cars by 34 percent from 2016 levels by 2025, resulting in a 3 percent decrease in average vehicle emissions for all vehicles by 2020. Vehicles traveling to the project site would com ply with the Pavley II (LEV III) Advanced Clean Cars Program (CARB n.d.‐b).
Therefore, the proposed project would not conflict with the identified transportation and motor vehicle measures.
The CARB’s 2022 Scoping Plan provides Table 3 “Key Residential and Mixed‐Use Project Attributes that Reduce GHGs” in Appendix D. The table is provided by CARB for use in determining whether a proposed residential or mixed
‐use residential development would align with the State’s climate goals, absent a locally or regionally adopted CEQA‐qualified CAP. Table 9 shows the project’s consistency with these attributes.
As described in CARB’s 2022 Scoping Plan, residential and mixed ‐use development projects that incorporate all of the applicable key project attributes are aligned with the State’s priority GHG reduction strategies for local climate action and with the State’s climate and housing goals. As shown in Table 9, the project would be considered to be consistent with the Scoping Plan.
1.f
Packet Pg. 166
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 20 Table 9: Key Residential and Mixed‐Use Project Attributes that Reduce GHGs Priority Areas Key Project Attribute Project Consistency Transportation
Electrification
Provides EV charging infrastructure that, at
minimum, meets the most ambitious voluntary
standard in the California Green Building
Standards Code at the time of project approval.
Consistent: Project provides charging
infrastructure for 49 electrical vehicles.
VMT Reduction
Is located on infill sites that are surrounded by
existing urban uses and reuses or redevelops
previously undeveloped or underutilized land
that is presently served by existing utilities and
essential public services (e.g., transit, streets,
water, sewer).
Consistent: Project development is
surrounded by existing urban uses and
reuses and presently served by exi sting
utilities and essential public services. It is
adjacent to a major City arterial.
Does not result in the loss or conversion of
natural and working lands.
Consistent: Project site is an existing parking
lot, thus not affecting natural and working
land.
Consists of transit‐supportive densities (minimum
of 20 residential dwelling units per acre), or is in
proximity to existing transit stops (within a half
mile), or satisfies more detailed and stringent
criteria specified in the region’s SCS.
Consistent: The zoning allows the project to
comply, the project provides 30 units in 1.53
acres for mix‐used
development. The project
is within 250 feet of a bus stop.
Reduces parking requirements by: eliminating
parking requirements or including maximum
allowable parking ratios (i.e., the ratio of parking
spaces to residential units or square feet); or
providing residential parking supply at a ratio of
less than one parking space per dwelling unit; or
for multifamily residential development,
requiring parking costs to be unbundled from
cos
ts to rent or own a residential unit.
Consistent: Parking provided at a ratio of
one parking space per unit, with shared
credit between the commercial visitors and
residential unit visitors. A shared parking
analysis was provided by a traffic engineer.
At least 20 percent of units included are
affordable to lower‐income residents.
Not Applicable: The project does not include
an affordable housing component; however,
the project would include one‐bedroom
units that would be accessible to various
income levels and consistent with the
density goals of the Scoping Plan.
Results in no net loss of existing affordable units.
Consistent: The project would not result in
the loss of existing affordable units.
Building
Decarbonization
Uses all‐electric appliances without any natural
gas connections and does not use propane or
other fossil fuels for space heating, water
heating, or indoor cooking.
Consistent: All appliances to be electrical.
Source: CARB 2022 Scoping Plan (CARB 2022).
EV = electric vehicle
GHG = greenhouse gas
SCS = Sustainable Communities Strategy
VMT = vehicle miles traveled
Per CARB guidance, as included in Appendix D of the CARB 2022 Scoping Plan, since the proposed project includes the applicable Local Actions included in Table 9 it would therefore also be considered consistent with the goals of the State and the 2022 Scoping Plan. As such, the proposed project is considered to be consistent with other plans, policies, or regulations adop ted for the purposes of reducing GHGs. Furthermore, as the proposed project would meet all requirements of
1.f
Packet Pg. 167
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 21 Title 24, CalGreen, and the City’s municipal code, and would incorporate the emission reduction measures included in the City’s CAP, the proposed project would not conflict with the goals of the City’s General Plan or CAP.
In addition, the 2020–2045 RTP/SCS was determined by CARB to achieve CARB’s 2035 GHG reduction targets; therefore, consistency
with the RTP/SCS would demonstrate consistency with the 2022 Scoping Plan. As further discussed in the Transportation Memorandum prepared for the proposed project (LSA 2022), the proposed project meets the City’s vehicle miles traveled screening criteria and would have a less than significant impact on the transportation system based on the significan
ce thresholds in Appendix G of the State CEQA Guidelines. Furthermore, the proposed project includes infrastructure to support electrification, and introduces a mix of land uses in an urban area, with residential housing located near workspaces and retail shopping. Therefore, the proposed project would not conflict with the goals of the RTP/SCS.
The low level
of project GHG emissions shown in Table 8 combined with the attributes shown in Table 9 indicate that the project would be compliant with all City, regional, and State GHG emissions reduction plans. Therefore, the proposed project’s GHG emissions would not result in a significant impact.
STANDARD CONDITIONS
Construction
The project is required to comply with regional rules that assist in reducing short‐term air pollutant emissions. SCAQMD Rule 403 requires that fugitive dust be controlled with the best‐available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source (SCAQMD 2005). In addition, SCAQ MD Rule 403 requires implementation of dust suppression techniques to prevent fugitive dust from creating a nuisance off site. Applicable dust suppression techniques from Rule 403 are summarized below.
Implementation of these dust suppression techniques can reduce the fugitive dust generation (and thus the PM10 component). Compliance with these rules would reduce impacts on nearby sensitive receptors (SCAQMD 2005). As shown in Table 5, implementation of Rule 403 measures results in dust emissions below SCAQMD thresholds.
The applicable Rule 403 measures are as follows:
Apply nontoxic chemical soil stabilizers according to manufacturers’ specifications to all inactive construction areas
(previously graded areas inactive for 10 days or more). Water active sites at least twice daily (locations where grading is to occur shall be thoroughly watered prior to earthmoving).
Cover all trucks hauling dirt, sand, soil, or other loose materials, or maintain at least 2 feet (0.6 meter) of freeboard (vertical space between the top of the loa d and the top of the trailer) in
accordance with the requirements of California Vehicle Code Section 23114. Pave construction access roads at least 100 feet (30 meters) onto the site from the main road.
1.f
Packet Pg. 168
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
10/9/23 «P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx» 22 Reduce traffic speeds on all unpaved roads to 15 mph or less.
The applicable California Department of Resources Recycling and Recovery (CalRecycle) Sustainable (Green) Building Program Measures are:
Recycle/reuse at least 50 percent of the construction material (including, but not limited to, soil, mulch, vegetation, concrete, lumber, metal, and cardboard) (CalRecycle 2019a). Use “green building ma
terials” such as those materials that are rapidly renewable or resource‐ efficient, and recycled and manufactured in an environmentally friendly way, for at least 10 percent of the project, as specified on the CalRecycle website (CalRecycle 2019b).
Operations
The proposed project is required to comply with the CALGreen Code and Title 24 of the California Code of Regulations established by the California Energy Commission regarding energy conservation and green building standards.
CONCLUSION
Based on the analysis presented above, the construction and operational emissions associated with the proposed project would not exceed SCAQMD established significance thresholds. The proposed project is not expected to produce significant emissions that would affect nearby sensitive receptors. The proposed project would also not result in objectionable odors affecting a substantial numb
er of people. GHG emissions released during operation of the project are estimated to be lower than significance thresholds and would not be cumulatively considerable. Additionally, the project would not conflict with the goals and objectives of State or regional plan, policy or regulation of an agency adopted for the purpose of redu cing GHG emissions.
Attachments: A: References
B: Figures
C: CalEEMod Output
1.f
Packet Pg. 169
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) A‐1
P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx (10/09/23) ATTACHMENT A
REFERENCES
California Air Resources Board (CARB). 2013. Amendments to California Cap‐and‐Trade Program.
April 9. Website: www.arb.ca.gov/sites/default/files/cap‐and‐trade/linkage/resolution13‐
7.pdf (accessed August 2023).
_____. 2022. Climate Change Scoping Plan: A Framework for Change. December. Website:
www.arb.ca.gov/our‐work/programs/ab‐32‐climate‐change‐scoping‐plan (accessed August 2023).
_____. n.d.‐a. Cap‐and‐Trade Program. Website: www.arb.ca.gov/our‐ work/programs/cap‐and‐ trade‐program (accessed August 2023).
_____. n.d.‐b. Low‐Emission Vehicle Greenhouse Gas Program. Website: www.arb.ca.gov/our‐ work/programs/advanced‐clean‐cars‐program/lev‐program/low‐emission‐vehicle‐ greenhouse‐gas (accessed August 2023).
California Department of Conservation (DOC). 2023. Naturally‐Occurring Asbestos in California.
Website: https://www.conservation.ca.gov/cgs/minerals/mineral‐hazards/asbestos (accessed August 2023).
California Department of Resources Recycling and Rec overy (CalRecycle). 2019a. Construction and Demolition Debris Recycling. Website: https://calrecycle.ca.gov/ConDemo/ (accessed August 2023).
_____. 2019b. Implementing the Governor’s Sustainable Building Executive Order: Sustainable (Green) Building Programs at CalRecycle. Website:
https://calrecycle.ca.gov/GreenBuilding/Programs/ (accessed August 2023).
City of Santa Clarita. 2011. City of Santa Clarita General Plan, Conservation and Open Spac e Element.
Website: www.codepublishing.com/CA/SantaClarita/html/SantaClaritaGP/6%20‐%20 Conservation%20and%20Open%20Space%20Element.pdf (accessed August 2023). _____. 2012. Climate Action Plan. August. Website: greensantaclarita.com/files/2012/10/ APPROVED‐CAP‐AUGUST‐2012.pdf (accessed August 2023).
Intergovernmental Panel on Climate Change (IPCC). 2023. AR6 Synthesis Report: Climate Change 2023. Website: www.ipcc.ch/report/sixth‐assessment‐report‐cycle/ (accessed August 2023).
LSA. 2022. Transportation Memorandum for th e Promenade Flats Project, April.
1.f
Packet Pg. 170
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) A‐2
P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx (10/09/23) South Coast Air Quality Management District (SCAQMD). 1993. CEQA Air Quality Handbook. April.
Website: www.aqmd.gov/home/rules‐compliance/ceqa/air‐quality‐analysis‐handbook/ ceqa‐air‐quality‐handbook‐(1993) (accessed August 2023). _____. 2005. Rule 403. Fugitive Dust. Website: www.aqmd.gov/docs/default‐source/rule‐book/rule‐ iv/rule‐403.pdf (accessed August 2023).
_____. 2008. Final Localized Significance Threshold Methodology. June. Website: www.aqmd.gov/ docs/default‐source/ceqa/handbook/localized‐
significance‐thresholds/final‐lst‐
methodology‐document.pdf (accessed August 2023).
–––––. 2015. Multiple Air Toxics Exposure Study in the South Coast Air Basin (MATES‐IV). August.
Website: www.aqmd.gov/home/air‐quality/air‐quality‐studies/health‐studies/mates‐iv (accessed August 2023).
_____. 2016. Advisory Notice on Rule 1113. Website: www.aqmd.gov/docs/default‐source/rule‐ book/reg‐xi/r1113.pdf (accessed August 2023).
_____.
2019. South Coast AQMD Air Quality Significance Thresholds. April. Website:
https://www.aqmd.gov/docs/default‐source/ceqa/handbook/south‐coast‐aqmd‐air‐quality‐ significance‐thresholds.pdf?sfvrsn=25 (accessed August 2023). _____. 2022. Final 2022 Air Quality Management Plan. February. Website: www.aqmd.gov/home/ air‐quality/clean‐air‐plans/air‐quality‐mgt‐plan (accessed August 2023). _____. n.d. Air Quality Analysis Handbook. Website: www.aqmd.go v/home/rules‐compliance/ ceqa/air‐quality‐analysis‐handbook (accessed August 2023). _____. Greenhouse Gases (GHG) CEQA Significance Thresholds. Website: www.aqmd.gov/home/ regulations/ceqa/air‐quality‐analysis‐handbook/ghg‐significance‐thresholds/ (accessed August 2023).
_____. National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (CAAQS) Attainment Status for South Coast Air Basin. Website: www.aqmd.gov/ docs/default‐source/clean‐air‐plans/air‐quality‐management‐ plans/naaqs‐caaqs‐
feb2016.pdf (accessed August 2023).
United States Environmental Protection Agency (EPA). 2021a. Regulations for Emissions from Vehicles and Engines. Website: www.epa.gov/regulations‐emissions‐vehicles‐and‐engines/ final‐rule‐phase‐2‐greenhouse‐gas‐emissions‐standards (accessed August 2023). _____. 2021b. Final Rule to Revise Existing National GHG Emissions Standards for Passenger Cars and Light Tru
cks Through Model Year 2026. Website: www.epa.gov/regulations‐emissions‐ vehicles‐and‐engines/final‐rule‐revise‐existing‐national‐ghg‐emissions (accessed August 2023).
1.f
Packet Pg. 171
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx «10/09/23» ATTACHMENT B
FIGURES
1.f
Packet Pg. 172
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) SOURCE: ArcGIS Online Topographic Map (2020)
Ven tu ra
County
Los
Angeles
County
27 170
126
14 118
405
210
5 I:\HAV2001\G\Project_LocaƟon.ai (10/6/2023)
FIGURE 1
Promenade Flats
Project LocaƟon
Project Vicinity
FEET
LEGEND
Project Site
0 500 1000
Project Location
1.f
Packet Pg. 173
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
NOT PART
OF THE PROJECT
SOURCE: CHARC Design
FEET
60300
FIGURE 2
I:\HAV2001\G\Site_Plan.ai (10/6/2023)
Promenade Flats
Site Plan
LEGEND
Project Site
1.f
Packet Pg. 174
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
P:\HAV2001\AQ‐GHG\Products\HAV2001 AQ‐GHG Memo_20231006.docx «10/09/23» ATTACHMENT C
CALEEMOD OUTPUT
1.f
Packet Pg. 175
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
1 / 39
Santa Clarita Plaza (HAV2001) Custom Report
Table of Contents
1. Basic Project Information
1.1. Basic Project Information
1.2. Land Use Types
1.3. User-Selected Emission Reduction Measures by Emissions Sector
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds
2.2. Construction Emissions by Y ear, Unmitigated
2.4. Operations Emissions Compared Against Thresholds
2.5. Operations Emissions by Sector, Unmitigated
3. Construction Emissions Details
3.1. Demolition (2024) - Unmitigated
3.3. Site Preparation (2024) - Unmitigated
3.5. Grading (2024) - Unmitigated
3.7. Building Construction (2024) - Unmitigated
1.f
Packet Pg. 176
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
2 / 39
3.9. Paving (2024) - Unmitigated
3.11. Paving (2025) - Unmitigated
3.13. Architectural Coating (2024) - Unmitigated
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
4.3. Area Emissions by Source
4.3.2. Unmitigated
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
1.f
Packet Pg. 177
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
3 / 39
5. Activity Data
5.1. Construction Schedule
5.2. Off-Road Equipment
5.2.1. Unmitigated
5.3. Construction Vehicles
5.3.1. Unmitigated
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
5.5. Architectural Coatings
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
5.6.2. Construction Earthmoving Control Strategies
5.7. Construction Paving
5.8. Construction Electricity Consumption and Emissions Factors
5.9. Operational Mobile Sources
5.9.1. Unmitigated
5.10. Operational Area Sources
1.f
Packet Pg. 178
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
4 / 39
5.10.1. Hearths
5.10.1.1. Unmitigated
5.10.2. Architectural Coatings
5.10.3. Landscape Equipment
5.11. Operational Energy Consumption
5.11.1. Unmitigated
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
5.13. Operational Waste Generation
5.13.1. Unmitigated
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
8. User Changes to Default Data
1.f
Packet Pg. 179
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
5 / 39
1. Basic Project Information
1.1. Basic Project Information
Data Field Value
Project Name Santa Clarita Plaza (HAV2001)
Construction Start Date 1/2/2024
Operational Y ear 2025
Lead Agency —
Land Use Scale Project/site
Analysis Level for Defaults County
Windspeed (m/s) 2.50
Precipitation (days) 16.0
Location 34.41859183266135, -118.54244801031707
County Los Angeles-South Coast
City Santa Clarita
Air District South Coast AQMD
Air Basin South Coast
TAZ 3623
EDFZ 7
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.14
1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq
ft)
Population Description
1.f
Packet Pg. 180
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
6 / 39
Condo/Townhouse 30.0 Dwelling Unit 1.00 31,800 11,042 0.00 89.0 — Health Club 3.03 1000sqft 0.00 3,027 0.00 0.00 — —
Regional Shopping
Center
7.27 1000sqft 0.00 7,266 0.00 0.00 — —
Parking Lot 0.53 Acre 0.53 0.00 4,892 0.00 — —
1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected
2. Emissions Summary
2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 3.66 10.7 13.6 0.02 0.40 0.44 0.84 0.37 0.10 0.48 — 2,519 2,519 0.10 0.05 2.11 2,540 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 3.66 19.2 18.1 0.04 0.74 3.01 3.72 0.68 1.37 2.05 — 5,383 5,383 0.26 0.46 0.18 5,528 Average
Daily
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 1.59 7.10 8.72 0.01 0.28 0.34 0.62 0.25 0.09 0.34 — 1,658 1,658 0.07 0.04 0.58 1,672 Annual
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 0.29 1.30 1.59 < 0.005 0.05 0.06 0.11 0.05 0.02 0.06 — 274 274 0.01 0.01 0.10 277
1.f
Packet Pg. 181
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
7 / 39
—————————————————Exceeds
(Daily
Max)
Threshold 75.0 100 550 150 — — 150 — — 55.0 — — — — — — — Unmit. No No No No — — No — — No — — — — — — —
Exceeds
(Av
erage
Daily)
— — — — — — — — — — — — — — — — —
Threshold 75.0 100 550 150 — — 150 — — 55.0 — — — — — — — Unmit. No No No No — — No — — No — — — — — — —
2.2. Construction Emissions by Y ear, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Y ear ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — — —
2024 3.66 10.7 13.6 0.02 0.40 0.44 0.84 0.37 0.10 0.48 — 2,519 2,519 0.10 0.05 2.11 2,540 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — — —
2024 3.66 19.2 18.1 0.04 0.74 3.01 3.72 0.68 1.37 2.05 — 5,383 5,383 0.26 0.46 0.18 5,528 2025 0.59 4.69 7.24 0.01 0.20 0.16 0.37 0.19 0.04 0.22 — 1,156 1,156 0.05 0.01 0.02 1,161 Average
Daily
— — — — — — — — — — — — — — — — —
2024 1.59 7.10 8.72 0.01 0.28 0.34 0.62 0.25 0.09 0.34 — 1,658 1,658 0.07 0.04 0.58 1,672 2025 < 0.005 0.02 0.03 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 4.53 4.53 < 0.005 < 0.005 < 0.005 4.55 Annual — — — — — — — — — — — — — — — — —
2024 0.29 1.30 1.59 < 0.005 0.05 0.06 0.11 0.05 0.02 0.06 — 274 274 0.01 0.01 0.10 277 2025 < 0.005 < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 0.75 0.75 < 0.005 < 0.005 < 0.005 0.75
1.f
Packet Pg. 182
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
8 / 39
2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 3.28 1.58 17.0 0.03 0.04 2.84 2.88 0.04 0.72 0.76 28.9 3,932 3,960 3.13 0.15 12.1 4,096 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 3.03 1.69 14.0 0.03 0.04 2.84 2.87 0.04 0.72 0.76 28.9 3,791 3,820 3.14 0.16 0.58 3,946 Average
Daily
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 3.16 1.71 15.7 0.03 0.04 2.84 2.88 0.04 0.72 0.76 28.9 3,831 3,860 3.14 0.16 5.38 3,991 Annual
(Max)
— — — — — — — — — — — — — — — — —
Unmit. 0.58 0.31 2.87 0.01 0.01 0.52 0.52 0.01 0.13 0.14 4.79 634 639 0.52 0.03 0.89 661 Exceeds
(Daily
Max)
— — — — — — — — — — — — — — — — —
Threshold 55.0 55.0 550 150 — — 150 — — 55.0 — — — — — — — Unmit. No No No No — — No — — No — — — — — — —
Exceeds
(Av
erage
Daily)
— — — — — — — — — — — — — — — — —
Threshold 55.0 55.0 550 150 — — 150 — — 55.0 — — — — — — — Unmit. No No No No — — No — — No — — — — — — —
2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual)
1.f
Packet Pg. 183
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
9 / 39
Sector ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Mobile 2.06 1.33 14.7 0.03 0.02 2.84 2.86 0.02 0.72 0.74 — 3,242 3,242 0.18 0.14 11.8 3,300 Area 1.21 0.02 2.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.39 6.39 < 0.005 < 0.005 — 6.41 Energy 0.01 0.23 0.12 < 0.005 0.02 — 0.02 0.02 — 0.02 — 663 663 0.05 < 0.005 — 665 Water — — — — — — — — — — 3.52 20.2 23.7 0.36 0.01 — 35.4 Waste — — — — — — — — — — 25.4 0.00 25.4 2.54 0.00 — 88.9 Refrig. — — — — — — — — — — — — — — — 0.28 0.28
Total 3.28 1.58 17.0 0.03 0.04 2.84 2.88 0.04 0.72 0.76 28.9 3,932 3,960 3.13 0.15 12.1 4,096 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Mobile 2.03 1.46 13.8 0.03 0.02 2.84 2.86 0.02 0.72 0.74 — 3,107 3,107 0.19 0.15 0.31 3,156 Area 0.99 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Energy 0.01 0.23 0.12 < 0.005 0.02 — 0.02 0.02 — 0.02 — 663 663 0.05 < 0.005 — 665 Water — — — — — — — — — — 3.52 20.2 23.7 0.36 0.01 — 35.4 Waste — — — — — — — — — — 25.4 0.00 25.4 2.54 0.00 — 88.9 Refrig. — — — — — — — — — — — — — — — 0.28 0.28
Total 3.03 1.69 14.0 0.03 0.04 2.84 2.87 0.04 0.72 0.76 28.9 3,791 3,820 3.14 0.16 0.58 3,946 Average
Daily
— — — — — — — — — — — — — — — — —
Mobile 2.01 1.47 14.1 0.03 0.02 2.84 2.86 0.02 0.72 0.74 — 3,144 3,144 0.19 0.15 5.10 3,197 Area 1.14 0.01 1.47 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 4.38 4.38 < 0.005 < 0.005 — 4.39 Energy 0.01 0.23 0.12 < 0.005 0.02 — 0.02 0.02 — 0.02 — 663 663 0.05 < 0.005 — 665 Water — — — — — — — — — — 3.52 20.2 23.7 0.36 0.01 — 35.4 Waste — — — — — — — — — — 25.4 0.00 25.4 2.54 0.00 — 88.9 Refrig. — — — — — — — — — — — — — — — 0.28 0.28
1.f
Packet Pg. 184
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
10 / 39
Total 3.16 1.71 15.7 0.03 0.04 2.84 2.88 0.04 0.72 0.76 28.9 3,831 3,860 3.14 0.16 5.38 3,991 Annual — — — — — — — — — — — — — — — — —
Mobile 0.37 0.27 2.58 0.01 < 0.005 0.52 0.52 < 0.005 0.13 0.14 — 520 520 0.03 0.02 0.85 529 Area 0.21 < 0.005 0.27 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.72 0.72 < 0.005 < 0.005 — 0.73 Energy < 0.005 0.04 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 110 110 0.01 < 0.005 — 110 Water — — — — — — — — — — 0.58 3.35 3.93 0.06 < 0.005 — 5.86 Waste — — — — — — — — — — 4.21 0.00 4.21 0.42 0.00 — 14.7 Refrig. — — — — — — — — — — — — — — — 0.05 0.05
Total 0.58 0.31 2.87 0.01 0.01 0.52 0.52 0.01 0.13 0.14 4.79 634 639 0.52 0.03 0.89 661
3. Construction Emissions Details
3.1. Demolition (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.61 15.6 16.0 0.02 0.67 — 0.67 0.62 — 0.62 — 2,494 2,494 0.10 0.02 — 2,502 Demolitio
n
— — — — — 2.13 2.13 — 0.32 0.32 — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
1.f
Packet Pg. 185
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
11 / 39
Off-Road
Equipment
0.02 0.21 0.22 < 0.005 0.01 — 0.01 0.01 — 0.01 — 34.2 34.2 < 0.005 < 0.005 — 34.3 Demolitio
n
— — — — — 0.03 0.03 — < 0.005 < 0.005 — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.04 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 5.66 5.66 < 0.005 < 0.005 — 5.67 Demolitio
n
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.06 0.07 0.80 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 167 167 0.01 0.01 0.02 169 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.06 3.53 1.31 0.02 0.03 0.72 0.75 0.03 0.20 0.23 — 2,722 2,722 0.15 0.44 0.16 2,856 Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.33 2.33 < 0.005 < 0.005 < 0.005 2.36 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.05 0.02 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 37.3 37.3 < 0.005 0.01 0.04 39.2 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.39 0.39 < 0.005 < 0.005 < 0.005 0.39 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling < 0.005 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 6.17 6.17 < 0.005 < 0.005 0.01 6.48
1.f
Packet Pg. 186
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
12 / 39
3.3. Site Preparation (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.43 13.7 12.9 0.02 0.65 — 0.65 0.59 — 0.59 — 2,064 2,064 0.08 0.02 — 2,071 Dust
From
Mater
ial
Movement
— — — — — 2.44 2.44 — 1.17 1.17 — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.01 0.07 0.07 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 11.3 11.3 < 0.005 < 0.005 — 11.3 Dust
From
Mater
ial
Movement
— — — — — 0.01 0.01 — 0.01 0.01 — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 1.87 1.87 < 0.005 < 0.005 — 1.88
1.f
Packet Pg. 187
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
13 / 39
———————< 0.005< 0.005—< 0.005< 0.005—————Dust
From
Mater
ial
Movement
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.03 0.04 0.48 0.00 0.00 0.10 0.10 0.00 0.02 0.02 — 100 100 < 0.005 < 0.005 0.01 102 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.56 0.56 < 0.005 < 0.005 < 0.005 0.57 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.09 0.09 < 0.005 < 0.005 < 0.005 0.09 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.5. Grading (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
1.f
Packet Pg. 188
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
14 / 39
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.65 15.9 15.4 0.02 0.74 — 0.74 0.68 — 0.68 — 2,454 2,454 0.10 0.02 — 2,462 Dust
From
Mater
ial
Movement
— — — — — 2.76 2.76 — 1.34 1.34 — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.02 0.17 0.17 < 0.005 0.01 — 0.01 0.01 — 0.01 — 26.9 26.9 < 0.005 < 0.005 — 27.0 Dust
From
Mater
ial
Movement
— — — — — 0.03 0.03 — 0.01 0.01 — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 4.45 4.45 < 0.005 < 0.005 — 4.47 Dust
From
Mater
ial
Movement
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
1.f
Packet Pg. 189
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
15 / 39
—————————————————Daily,
Summer
(Max)
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.04 0.06 0.64 0.00 0.00 0.13 0.13 0.00 0.03 0.03 — 134 134 0.01 < 0.005 0.01 135 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 1.49 1.49 < 0.005 < 0.005 < 0.005 1.51 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.25 0.25 < 0.005 < 0.005 < 0.005 0.25 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.7. Building Construction (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.13 9.44 10.1 0.02 0.37 — 0.37 0.34 — 0.34 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
1.f
Packet Pg. 190
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
16 / 39
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
1.13 9.44 10.1 0.02 0.37 — 0.37 0.34 — 0.34 — 1,801 1,801 0.07 0.01 — 1,807 Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.68 5.69 6.09 0.01 0.22 — 0.22 0.21 — 0.21 — 1,086 1,086 0.04 0.01 — 1,089 Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.12 1.04 1.11 < 0.005 0.04 — 0.04 0.04 — 0.04 — 180 180 0.01 < 0.005 — 180 Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.11 0.12 1.90 0.00 0.00 0.33 0.33 0.00 0.08 0.08 — 356 356 0.01 0.01 1.40 361 Vendor < 0.005 0.19 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 158 158 0.01 0.02 0.43 165 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.11 0.14 1.61 0.00 0.00 0.33 0.33 0.00 0.08 0.08 — 337 337 0.02 0.01 0.04 341 Vendor < 0.005 0.19 0.09 < 0.005 < 0.005 0.04 0.04 < 0.005 0.01 0.01 — 158 158 0.01 0.02 0.01 165 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
1.f
Packet Pg. 191
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
17 / 39
Worker 0.07 0.09 1.02 0.00 0.00 0.20 0.20 0.00 0.05 0.05 — 206 206 0.01 0.01 0.36 209 Vendor < 0.005 0.12 0.06 < 0.005 < 0.005 0.03 0.03 < 0.005 0.01 0.01 — 95.2 95.2 < 0.005 0.01 0.11 99.3 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker 0.01 0.02 0.19 0.00 0.00 0.04 0.04 0.00 0.01 0.01 — 34.1 34.1 < 0.005 < 0.005 0.06 34.6 Vendor < 0.005 0.02 0.01 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — 15.8 15.8 < 0.005 < 0.005 0.02 16.4 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.9. Paving (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.53 4.90 6.53 0.01 0.23 — 0.23 0.21 — 0.21 — 992 992 0.04 0.01 — 995 Paving 0.04 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.04 0.40 0.54 < 0.005 0.02 — 0.02 0.02 — 0.02 — 81.5 81.5 < 0.005 < 0.005 — 81.8 Paving < 0.005 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
1.f
Packet Pg. 192
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
18 / 39
Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.01 0.07 0.10 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 13.5 13.5 < 0.005 < 0.005 — 13.5 Paving < 0.005 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.06 0.07 0.80 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 167 167 0.01 0.01 0.02 169 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 0.01 0.07 0.00 0.00 0.01 0.01 0.00 < 0.005 < 0.005 — 14.0 14.0 < 0.005 < 0.005 0.02 14.1 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.01 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 2.31 2.31 < 0.005 < 0.005 < 0.005 2.34 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.11. Paving (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
1.f
Packet Pg. 193
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
19 / 39
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.49 4.63 6.50 0.01 0.20 — 0.20 0.19 — 0.19 — 992 992 0.04 0.01 — 995 Paving 0.04 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.02 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 3.88 3.88 < 0.005 < 0.005 — 3.89 Paving < 0.005 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.64 0.64 < 0.005 < 0.005 — 0.64 Paving < 0.005 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.05 0.06 0.74 0.00 0.00 0.16 0.16 0.00 0.04 0.04 — 164 164 0.01 0.01 0.02 166 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
1.f
Packet Pg. 194
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
20 / 39
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.65 0.65 < 0.005 < 0.005 < 0.005 0.66 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 < 0.005 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 0.11 0.11 < 0.005 < 0.005 < 0.005 0.11 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
3.13. Architectural Coating (2024) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Onsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.14 0.91 1.15 < 0.005 0.03 — 0.03 0.03 — 0.03 — 134 134 0.01 < 0.005 — 134 Architectu
ral
Coatings
2.25 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.14 0.91 1.15 < 0.005 0.03 — 0.03 0.03 — 0.03 — 134 134 0.01 < 0.005 — 134
1.f
Packet Pg. 195
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
21 / 39
————————————————2.25Architectu
ral
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.04 0.28 0.35 < 0.005 0.01 — 0.01 0.01 — 0.01 — 40.6 40.6 < 0.005 < 0.005 — 40.7 Architectu
ral
Coatings
0.68 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Off-Road
Equipment
0.01 0.05 0.06 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 6.72 6.72 < 0.005 < 0.005 — 6.75 Architectu
ral
Coatings
0.13 — — — — — — — — — — — — — — — —
Onsite
truc
k
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.02 0.02 0.38 0.00 0.00 0.07 0.07 0.00 0.02 0.02 — 71.2 71.2 < 0.005 < 0.005 0.28 72.2 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Worker 0.02 0.03 0.32 0.00 0.00 0.07 0.07 0.00 0.02 0.02 — 67.4 67.4 < 0.005 < 0.005 0.01 68.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
1.f
Packet Pg. 196
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
22 / 39
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.10 0.00 0.00 0.02 0.02 0.00 < 0.005 < 0.005 — 20.8 20.8 < 0.005 < 0.005 0.04 21.1 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.02 0.00 0.00 < 0.005 < 0.005 0.00 < 0.005 < 0.005 — 3.45 3.45 < 0.005 < 0.005 0.01 3.49 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
4. Operations Emissions Details
4.1. Mobile Emissions by Land Use
4.1.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
0.47 0.38 4.29 0.01 0.01 0.90 0.91 0.01 0.23 0.23 — 1,017 1,017 0.05 0.04 3.75 1,034 Health
Club
0.33 0.20 2.16 < 0.005 < 0.005 0.40 0.40 < 0.005 0.10 0.10 — 458 458 0.03 0.02 1.66 467 Regional
Shopping
Center
1.25 0.76 8.28 0.02 0.01 1.54 1.55 0.01 0.39 0.40 — 1,766 1,766 0.11 0.08 6.41 1,799 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00
1.f
Packet Pg. 197
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
23 / 39
Total 2.06 1.33 14.7 0.03 0.02 2.84 2.86 0.02 0.72 0.74 — 3,242 3,242 0.18 0.14 11.8 3,300 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
0.47 0.41 3.93 0.01 0.01 0.90 0.91 0.01 0.23 0.23 — 974 974 0.05 0.04 0.10 988 Health
Club
0.32 0.22 2.05 < 0.005 < 0.005 0.40 0.40 < 0.005 0.10 0.10 — 440 440 0.03 0.02 0.04 447 Regional
Shopping
Center
1.23 0.83 7.86 0.02 0.01 1.54 1.55 0.01 0.39 0.40 — 1,694 1,694 0.11 0.08 0.17 1,721 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 2.03 1.46 13.8 0.03 0.02 2.84 2.86 0.02 0.72 0.74 — 3,107 3,107 0.19 0.15 0.31 3,156 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
0.08 0.08 0.74 < 0.005 < 0.005 0.16 0.17 < 0.005 0.04 0.04 — 163 163 0.01 0.01 0.27 166 Health
Club
0.06 0.04 0.38 < 0.005 < 0.005 0.07 0.07 < 0.005 0.02 0.02 — 73.6 73.6 < 0.005 < 0.005 0.12 74.9 Regional
Shopping
Center
0.22 0.15 1.46 < 0.005 < 0.005 0.28 0.28 < 0.005 0.07 0.07 — 284 284 0.02 0.01 0.46 289 Parking
Lot
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 Total 0.37 0.27 2.58 0.01 < 0.005 0.52 0.52 < 0.005 0.13 0.14 — 520 520 0.03 0.02 0.85 529
4.2. Energy
4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e
1.f
Packet Pg. 198
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
24 / 39
—————————————————Daily,
Summer
(Max)
Condo/To
wnhouse
— — — — — — — — — — — 201 201 0.01 < 0.005 — 202
Health
Club
— — — — — — — — — — — 42.3 42.3 < 0.005 < 0.005 — 42.5
Regional
Shopping
Center
— — — — — — — — — — — 104 104 0.01 < 0.005 — 104
Parking
Lot
— — — — — — — — — — — 29.5 29.5 < 0.005 < 0.005 — 29.6
Total — — — — — — — — — — — 377 377 0.02 < 0.005 — 378
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 201 201 0.01 < 0.005 — 202
Health
Club
— — — — — — — — — — — 42.3 42.3 < 0.005 < 0.005 — 42.5
Regional
Shopping
Center
— — — — — — — — — — — 104 104 0.01 < 0.005 — 104
Parking
Lot
— — — — — — — — — — — 29.5 29.5 < 0.005 < 0.005 — 29.6
Total — — — — — — — — — — — 377 377 0.02 < 0.005 — 378
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — 33.2 33.2 < 0.005 < 0.005 — 33.4
Health
Club
— — — — — — — — — — — 7.01 7.01 < 0.005 < 0.005 — 7.03
Regional
Shopping
Center
— — — — — — — — — — — 17.2 17.2 < 0.005 < 0.005 — 17.3
1.f
Packet Pg. 199
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
25 / 39
Parking
Lot
— — — — — — — — — — — 4.88 4.88 < 0.005 < 0.005 — 4.90
Total — — — — — — — — — — — 62.4 62.4 < 0.005 < 0.005 — 62.6
4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
0.01 0.18 0.08 < 0.005 0.01 — 0.01 0.01 — 0.01 — 231 231 0.02 < 0.005 — 232 Health
Club
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 41.5 41.5 < 0.005 < 0.005 — 41.6 Regional
Shopping
Center
< 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 13.9 13.9 < 0.005 < 0.005 — 14.0 Parking
Lot
0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 0.23 0.12 < 0.005 0.02 — 0.02 0.02 — 0.02 — 287 287 0.03 < 0.005 — 287 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
0.01 0.18 0.08 < 0.005 0.01 — 0.01 0.01 — 0.01 — 231 231 0.02 < 0.005 — 232 Health
Club
< 0.005 0.03 0.03 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 41.5 41.5 < 0.005 < 0.005 — 41.6 Regional
Shopping
Center
< 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 13.9 13.9 < 0.005 < 0.005 — 14.0 Parking
Lot
0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total 0.01 0.23 0.12 < 0.005 0.02 — 0.02 0.02 — 0.02 — 287 287 0.03 < 0.005 — 287
1.f
Packet Pg. 200
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
26 / 39
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
< 0.005 0.03 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 38.3 38.3 < 0.005 < 0.005 — 38.4 Health
Club
< 0.005 0.01 0.01 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 6.88 6.88 < 0.005 < 0.005 — 6.89 Regional
Shopping
Center
< 0.005 < 0.005 < 0.005 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 2.31 2.31 < 0.005 < 0.005 — 2.31 Parking
Lot
0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 — 0.00 0.00 0.00 0.00 — 0.00 Total < 0.005 0.04 0.02 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 47.4 47.4 < 0.005 < 0.005 — 47.6
4.3. Area Emissions by Source
4.3.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products
0.90 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings
0.08 — — — — — — — — — — — — — — — —
Landscap
e
Equipme
nt
0.23 0.02 2.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 6.39 6.39 < 0.005 < 0.005 — 6.41 Total 1.21 0.02 2.15 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 6.39 6.39 < 0.005 < 0.005 — 6.41
1.f
Packet Pg. 201
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
27 / 39
—————————————————Daily,
Winter
(Max)
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products
0.90 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings
0.08 — — — — — — — — — — — — — — — —
Total 0.99 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Annual — — — — — — — — — — — — — — — — —
Hearths 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 Consume
r
Products
0.16 — — — — — — — — — — — — — — — —
Architectu
ral
Coatings
0.02 — — — — — — — — — — — — — — — —
Landscap
e
Equipme
nt
0.03 < 0.005 0.27 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 0.72 0.72 < 0.005 < 0.005 — 0.73 Total 0.21 < 0.005 0.27 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 0.00 0.72 0.72 < 0.005 < 0.005 — 0.73
4.4. Water Emissions by Land Use
4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
1.f
Packet Pg. 202
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
28 / 39
Condo/To — — — — — — — — — — 2.14 12.6 14.7 0.22 0.01 — 21.8 Health
Club
— — — — — — — — — — 0.34 1.78 2.12 0.04 < 0.005 — 3.26
Regional
Shopping
Center
— — — — — — — — — — 1.03 5.34 6.37 0.11 < 0.005 — 9.79
Parking
Lot
— — — — — — — — — — 0.00 0.53 0.53 < 0.005 < 0.005 — 0.53 Total — — — — — — — — — — 3.52 20.2 23.7 0.36 0.01 — 35.4 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 2.14 12.6 14.7 0.22 0.01 — 21.8
Health
Club
— — — — — — — — — — 0.34 1.78 2.12 0.04 < 0.005 — 3.26
Regional
Shopping
Center
— — — — — — — — — — 1.03 5.34 6.37 0.11 < 0.005 — 9.79
Parking
Lot
— — — — — — — — — — 0.00 0.53 0.53 < 0.005 < 0.005 — 0.53 Total — — — — — — — — — — 3.52 20.2 23.7 0.36 0.01 — 35.4 Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 0.35 2.08 2.43 0.04 < 0.005 — 3.61
Health
Club
— — — — — — — — — — 0.06 0.29 0.35 0.01 < 0.005 — 0.54
Regional
Shopping
Center
— — — — — — — — — — 0.17 0.88 1.06 0.02 < 0.005 — 1.62
Parking
Lot
— — — — — — — — — — 0.00 0.09 0.09 < 0.005 < 0.005 — 0.09 Total — — — — — — — — — — 0.58 3.35 3.93 0.06 < 0.005 — 5.86
1.f
Packet Pg. 203
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
29 / 39
4.5. Waste Emissions by Land Use
4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 12.0 0.00 12.0 1.20 0.00 — 41.9
Health
Club
— — — — — — — — — — 9.31 0.00 9.31 0.93 0.00 — 32.6
Regional
Shopping
Center
— — — — — — — — — — 4.11 0.00 4.11 0.41 0.00 — 14.4
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 25.4 0.00 25.4 2.54 0.00 — 88.9 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — 12.0 0.00 12.0 1.20 0.00 — 41.9
Health
Club
— — — — — — — — — — 9.31 0.00 9.31 0.93 0.00 — 32.6
Regional
Shopping
Center
— — — — — — — — — — 4.11 0.00 4.11 0.41 0.00 — 14.4
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 25.4 0.00 25.4 2.54 0.00 — 88.9 Annual — — — — — — — — — — — — — — — — —
1.f
Packet Pg. 204
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
30 / 39
Condo/To — — — — — — — — — — 1.98 0.00 1.98 0.20 0.00 — 6.94 Health
Club
— — — — — — — — — — 1.54 0.00 1.54 0.15 0.00 — 5.39
Regional
Shopping
Center
— — — — — — — — — — 0.68 0.00 0.68 0.07 0.00 — 2.38
Parking
Lot
— — — — — — — — — — 0.00 0.00 0.00 0.00 0.00 — 0.00
Total — — — — — — — — — — 4.21 0.00 4.21 0.42 0.00 — 14.7
4.6. Refrigerant Emissions by Land Use
4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.23 0.23
Health
Club
— — — — — — — — — — — — — — — 0.01 0.01
Regional
Shopping
Center
— — — — — — — — — — — — — — — 0.03 0.03
Total — — — — — — — — — — — — — — — 0.28 0.28
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.23 0.23
Health
Club
— — — — — — — — — — — — — — — 0.01 0.01
1.f
Packet Pg. 205
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
31 / 39
Regional
Shopping
Center
— — — — — — — — — — — — — — — 0.03 0.03
Total — — — — — — — — — — — — — — — 0.28 0.28
Annual — — — — — — — — — — — — — — — — —
Condo/To
wnhouse
— — — — — — — — — — — — — — — 0.04 0.04
Health
Club
— — — — — — — — — — — — — — — < 0.005 < 0.005
Regional
Shopping
Center
— — — — — — — — — — — — — — — 0.01 0.01
Total — — — — — — — — — — — — — — — 0.05 0.05
5. Activity Data
5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Demolition Demolition 1/2/2024 1/8/2024 5.00 5.00 —
Site Preparation Site Preparation 1/9/2024 1/10/2024 5.00 2.00 — Grading Grading 1/11/2024 1/16/2024 5.00 4.00 —
Building Construction Building Construction 1/17/2024 11/19/2024 5.00 220 — Paving Paving 11/20/2024 1/2/2025 5.00 32.0 —
Architectural Coating Architectural Coating 7/9/2024 12/10/2024 5.00 111 —
5.2. Off-Road Equipment
5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor
1.f
Packet Pg. 206
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
32 / 39
Demolition Concrete/Industrial
Saws
Diesel A verage 1.00 8.00 33.0 0.73
Demolition Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Demolition Tractors/Loaders/Backh
oes
Diesel Average 3.00 8.00 84.0 0.37
Site Preparation Graders Diesel Average 1.00 8.00 148 0.41 Site Preparation Rubber Tired Dozers Diesel Average 1.00 7.00 367 0.40 Site Preparation Tractors/Loaders/Backh
oes
Diesel Average 1.00 8.00 84.0 0.37
Grading Graders Diesel Average 1.00 8.00 148 0.41
Grading Rubber Tired Dozers Diesel Average 1.00 8.00 367 0.40 Grading Tractors/Loaders/Backh
oes
Diesel Average 2.00 7.00 84.0 0.37
Building Construction Cranes Diesel Average 1.00 6.00 367 0.29 Building Construction Forklifts Diesel Average 1.00 6.00 82.0 0.20 Building Construction Generator Sets Diesel Average 1.00 8.00 14.0 0.74 Building Construction Tractors/Loaders/Backh
oes
Diesel Average 1.00 6.00 84.0 0.37
Building Construction Welders Diesel Average 3.00 8.00 46.0 0.45 Paving Cement and Mortar
Mixers
Diesel A
verage 1.00 6.00 10.0 0.56
Paving Pavers Diesel Average 1.00 6.00 81.0 0.42
Paving Paving Equipment Diesel Average 1.00 8.00 89.0 0.36 Paving Rollers Diesel Average 1.00 7.00 36.0 0.38
Paving Tractors/Loaders/Backh
oes
Diesel Average 1.00 8.00 84.0 0.37
Architectural Coating Air Compressors Diesel Average 1.00 6.00 37.0 0.48
5.3. Construction Vehicles
1.f
Packet Pg. 207
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
33 / 39
5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Demolition — — — —
Demolition Worker 12.5 18.5 LDA,LDT1,LDT2
Demolition Vendor — 10.2 HHDT,MHDT
Demolition Hauling 38.6 20.0 HHDT
Demolition Onsite truck — — HHDT
Site Preparation — — — —
Site Preparation Worker 7.50 18.5 LDA,LDT1,LDT2
Site Preparation Vendor — 10.2 HHDT,MHDT
Site Preparation Hauling 0.00 20.0 HHDT
Site Preparation Onsite truck — — HHDT
Grading — — — —
Grading Worker 10.0 18.5 LDA,LDT1,LDT2
Grading Vendor — 10.2 HHDT,MHDT
Grading Hauling 0.00 20.0 HHDT
Grading Onsite truck — — HHDT
Building Construction — — — —
Building Construction Worker 25.2 18.5 LDA,LDT1,LDT2
Building Construction Vendor 4.89 10.2 HHDT,MHDT
Building Construction Hauling 0.00 20.0 HHDT
Building Construction Onsite truck — — HHDT
Paving — — — —
Paving Worker 12.5 18.5 LDA,LDT1,LDT2
Paving Vendor — 10.2 HHDT,MHDT
Paving Hauling 0.00 20.0 HHDT
Paving Onsite truck — — HHDT
1.f
Packet Pg. 208
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
34 / 39
Architectural Coating — — — —
Architectural Coating Worker 5.04 18.5 LDA,LDT1,LDT2
Architectural Coating Vendor — 10.2 HHDT,MHDT
Architectural Coating Hauling 0.00 20.0 HHDT
Architectural Coating Onsite truck — — HHDT
5.4. Vehicles
5.4.1. Construction Vehicle Control Strategies
Control Strategies Applied PM10 Reduction PM2.5 Reduction Water unpaved roads twice daily 55% 55%
Limit vehicle speeds on unpaved roads to 25 mph 44% 44% Sweep paved roads once per month 9% 9%
5.5. Architectural Coatings
Phase Name Residential Interior Area Coated
(sq ft)
Residential Exterior Area Coated
(sq ft)
Non-Residential Interior Area
Coated (sq
ft)
Non-Residential Exterior Area
Coated (sq
ft)
Parking Area Coated (sq ft)
Architectural Coating 64,395 21,465 15,450 5,150 1,385
5.6. Dust Mitigation
5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (Cubic Y ards) Material Exported (Cubic Y ards) Acres Graded (acres) Material Demolished (Ton of Debris)
Acres Paved (acres)
Demolition 0.00 0.00 0.00 772 —
Site Preparation 0.00 0.00 1.88 0.00 —
Grading 0.00 0.00 4.00 0.00 —
1.f
Packet Pg. 209
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
35 / 39
Paving 0.00 0.00 0.00 0.00 0.53
5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%
Water Demolished Area 2 36% 36%
5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Condo/Townhouse — 0%
Health Club 0.00 0%
Regional Shopping Center 0.00 0%
Parking Lot 0.53 100%
5.8. Construction Electricity Consumption and Emissions Factors kWh per Y ear and Emission Factor (lb/MWh)
Y ear kWh per Y ear CO2 CH4 N2O
2024 0.00 532 0.03 < 0.005
2025 0.00 532 0.03 < 0.005
5.9. Operational Mobile Sources
5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Y ear VMT/Weekday VMT/Saturday VMT/Sunday VMT/Y ear Condo/Townhouse 136 136 136 49,713 1,269 1,269 1,269 463,175 Health Club 105 105 105 38,155 562 562 562 205,185
1.f
Packet Pg. 210
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
36 / 39
Regional Shopping
Center
396 396 396 144,486 2,168 2,168 2,168 791,222
Parking Lot 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.10. Operational Area Sources
5.10.1. Hearths
5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Condo/Townhouse —
Wood Fireplaces 0
Gas Fireplaces 0
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 30
Conventional Wood Stoves 0
Catalytic Wood Stoves 0
Non-Catalytic Wood Stoves 0
Pellet Wood Stoves 0
5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
64395 21,465 15,440 5,147 1,385
5.10.3. Landscape Equipment
Season Unit Value
1.f
Packet Pg. 211
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
37 / 39
Snow Days day/yr 0.00
Summer Days day/yr 250
5.11. Operational Energy Consumption
5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Condo/Townhouse 137,765 532 0.0330 0.0040 720,911
Health Club 29,041 532 0.0330 0.0040 129,579
Regional Shopping Center 71,363 532 0.0330 0.0040 43,502 Parking Lot 20,224 532 0.0330 0.0040 0.00
5.12. Operational Water and Wastewater Consumption
5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Condo/Townhouse 1,118,214 189,273
Health Club 179,204 0.00
Regional Shopping Center 538,507 0.00
Parking Lot 0.00 68,608
5.13. Operational Waste Generation
5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Condo/Townhouse 22.2 —
1.f
Packet Pg. 212
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
38 / 39
Health Club 17.3 —
Regional Shopping Center 7.63 —
Parking Lot 0.00 —
5.14. Operational Refrigeration and Air Conditioning Equipment
5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Condo/Townhouse Average room A/C &
Other residential
A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Condo/Townhouse Household refrigerators
and/or freez
ers
R-134a 1,430 0.12 0.60 0.00 1.00
Health Club Other commercial A/C
and heat
pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Health Club Stand-alone retail
refriger
ators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00
Regional Shopping
Center
Other commercial A/C
and heat
pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Regional Shopping
Center
Stand-alone retail
refriger
ators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00
8. User Changes to Default Data
Screen Justification
Land Use Main site area is 1.2 acres, new parking lot is 0.33 acres. The "Health Club" and Regional Shopping Center" are
within the Residential building.
Construction: Construction Phases Construction schedule planned to start in January 2024 and last approximately 12 months. Assume architectural
coatings applied during the Building Construction phase.
Construction: Architectural Coatings Assume all coatings comply with SCAQMD Rule 1113.
1.f
Packet Pg. 213
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Santa Clarita Plaza (HAV2001) Custom Report, 8/9/2023
39 / 39
Operations: Vehicle Data Changes per traffic study and to match previous analysis.
Operations: Hearths No woodstoves or fireplaces
1.f
Packet Pg. 214
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) November 16, 2023
Santa Clarita Plaza Apartments Project for a Categorical Exemption as a Class 32 In-Fill Development (Envicom Project No. 2021-053-01)
Attachment D
Hydrology Report
1.f
Packet Pg. 215
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
1.f
Packet Pg. 216
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
TABLE OF CONTENTS
Section 1.0: PROJECT SUMMARY
1.1 Design Parameters
1.2 Overview of Analysis Procedure
1.3 Project Purpose and Scope
1.4 Existing and Proposed Drainage conditions
1.5 Hydrologic Analysis
1.6 Low Impact Development Analysis
1.7 Hydraulic Analysis
1.8 Conclusion
Section 2.0: HYDROLOGY CALCULATIONS
Section 3.0: LOW IMPACT DEVELOPMENT CALCULATIONS
Section 4.0: HYDRAULIC CALCULATIONS
Appendix A: HYDROLOGY/LOW IMPACT DEVELOPMENT MAP
1.f
Packet Pg. 217
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
Section 1.0
PROJECT SUMMARY
1.f
Packet Pg. 218
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
1.1 DESIGN PARAMETERS
References: Los Angeles Department of Public Works, Hydrology Manual Los Angeles County Department of Public Works, LID Manual
Rainfall Isohyet:
85th Percentile, 24
-Hr Rainfall:
Soil Type:
Manning's Roughness Coefficient:
6.6 in (50yr – 24hr)
0.95 in
020
n=0.009, PVC
Note: Project not within County Adopted Flood Plain or Floodway. Project not within FEMA Flood Zone.
A Hydrology map delineating the Tributary Drainage areas and tabulated findings within this project for this tract is included
in the Appendix of this report.
1.2 OVERVIEW OF ANALYSIS PROCEDURES
Analysis of the stormdrain runoff for both the existing and proposed conditions used the same techniques for analysis. Those being as follows:
Used LA County HydroCalc Program to determine times of concentration and peak flow rates.
Used LA County HydroCalc program to determine the SWQDv from the 85th percentile, 50-yr storm.
1.3 PROJECT PURPOSE AND SCOPE
The project site is the existing Santa Clarita Plaza Commercial Center located at 26111 to 26135 Bouquet Canyon Road, APNs 2811-003-016; -017, and -018. The site analyzed is
4.87 acres with existing infrastructure including buildings, parking lots, and underground utilities. The project proposes the development of an apartment building on the site along with surrounding parking stalls and planters. Additionally, the project site proposes the development of an overflow parking area to provided addition al parking spaces for residents and customers of the neighboring businesses.
1.4 EXISTING & PROPOSED DRAINAGE CONDITIONS
The site’s existing conditions and terrain force the runoff to sheet flow west bound across the parking lots, ultimately reaching existing catch basins that direct the runoff off site via an underground storm drainage system
.
The site’s proposed conditions and modifications change the drainage patterns of the site; the site continues to drain westbound and the runoff is collected by a network of concrete
1.f
Packet Pg. 219
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) swales that convey it to catch basins connected to the existing storm drainage system. As part of the scope of work, a currently undeveloped lot will be resurfaced to allow for vehicle access and parking. The runoff will drain through this parking lot and reach a proposed underground infiltration trench beneath this lot.
1.5 HYDROLOGIC ANALYSIS
The methodology used to compute stormwater runoff was that described in the latest County of Los Angeles Hydrology Manual. The LA County HydroCalc program was also used for stormwater runoff calculation purposes. A 50-yr Storm is used for this analysis.
The site’s existing conditions were broken up and analyzed as three separate subareas (1A, 2A, and 3A ). These subareas drain westbound, ultimately leaving the site through three outlet points at existing catch basins.
Subarea 1A is the north portion of the site, while subarea 2A is the central portion of the site, and subarea 3A is the southernmost portion of the site. The terrain of the site allows for runoff to sheet flow across the lot and eventually leave the property.
The table
below summarizes the Existing Conditions Hydrologic Analysis.
Subarea Area (ac) Flowline (ft) TC (min) Q50 (cfs)
1A 0.65 343 5 2.23
1B 2.18 374 5 7.61
1C 2.04 740 9 5.29
Site Total 4.87 - - 15.13
There is a total area analyzed is 4.87 acres and generates a Q50 runoff of 15.13 cfs.
In the proposed conditions, the site breaks up into 3 separate subareas (1A, 2A, and 3A).
Subarea 1A consists of the northern half of the project site. This subarea includes a redesigned parking lot, trash enclosure, and a proposed apartment building. The runoff from this subarea drains west through a concrete swale and is intercepted by catch basins and routed off site. Subarea 2A consists of the lower half of the project site. This subarea includes the development of the overflow parking area occurring on APN: 2811-003-016.
R
unoff from this subarea sheet flows westward and is collected at a catch basin and a proposed storm drainage pipe conveys the runoff to a proposed area of infiltration.
1.f
Packet Pg. 220
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) The table below summarizes the Proposed Conditions Hydrologic Analysis:
Subarea Area (ac) Flowline (ft) TC (min) Q50 (cfs)
1A 2.83 417 6 8.99
1B 2.04 740 8 5.82
Site Total 4.87 - - 14.81
Comparing the existing and the proposed conditions, the runoff caused by the 50 year- storm decreased by -0.32 cfs for the proposed site.
The decrease in flow rate is due to the change in flow line lengths between the subareas analyzed in the two separate conditions. In the existing conditions, the site has three outlet locations and therefore is divided into three subareas. The proposed improvements modify the drainage pattern to only have two outlet points. Because of this, the runoff was rerouted and consequently extended the flow line length. This caused the time of concentration (Tc) to increase and therefore minimizes the amount of runoff at the point of confluence at any point in time, resulting in a decreased runoff rate.
1.6 LOW IMPACT DEVELOPMENT ANALYSIS
The methodology used for the Low Impact Development Analysis was that described in the County of Los Angeles Department of Public Works: Low Impact Development Standards manual February 2014. The HydroCalc Program was also used for Stormwater Quality Design Volume (SWQDv) calculation purposes. The 85th Percentile storm for the site is 0.95
inches, which is greater than the 0.75 inch storm; the 85th Percentile Storm was used to generate the SWQDv.
The site is analyzed as 1 subarea (1A), where the runoff drains westward.
The method in which the SWQDv will be handled will be through an underground infiltration device beneath the proposed overflow parking lot.
The table below summarizes the Low Impact Development Analysis.
Subarea Area
(ac)
Flowline
(ft)
IMP QPM
(cfs)
SWQDv
(ft3)
1A 2.04 740 0.82 0.36 5275
Site Total 2.04 - - 0.36 5275
The total area analyzed is 2.04
acres not including offsite areas and generates a Q PM of
0.36 cfs and a SWQDv of 5275 ft3.
1.7 HYDRAULIC ANALYSIS
1.f
Packet Pg. 221
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) The methodology used to analyze the Hydraulic capacity of the drainage devices on the site is Manning's equation. The roughness coefficient used is n=0.009 for PVC pipe and the design flow for these pipes are 70% full. The design storm used is the 50-yr storm runoff.
The proposed drainage system onsite is comprised of a 10” PVC pipe. The slope of the pipe is 9.3% and the actual flow in the system is calculated to be 5.82 cfs. The storm drain system has been designed to flow 70% full however the proposed pipe drains at a much lower volume than the 70% design value. See Section 4.0 for information on the pipe
system including flow depth, flow velocity, and pipe max capacity.
1.9 CONCLUSION
The site is comprised of 3 lots with existing infrastructure located at 26111 to 26135 Bouquet Canyon Road in the City of Santa Clarita, Ca. The runoff of the site generally sheet flows to the west where it enters an underground drainage system and drains offsite.
The proposed conditions include the incorporation of a residential building and improvements to the parking lot area to provide additional parking stalls and planters.
The runoff from areas that are affected by the improvements will continue to drain west and will be collected by respective catch basins and conveyed to an underground infiltration trench within the property. The overall drainage design of the site has been adequately designed to handle the runoff of a 5
0-yr storm and is consistent with the
requirements of the County of Los Angeles, Department of Public Works.
1.f
Packet Pg. 222
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
Section 2.0
HYDROLOGIC CALCULATIONS
(EXISTING CONDITIONS - HYDROCALC CALCULATOR)
1.f
Packet Pg. 223
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Peak Flow Hydrologic Analysis
File location: F:/Job Files/3525- IHOP/Civil/Hydrology/Calculations/Existing/Output/3525 SC PLAZA EX Report.pdf Version: HydroCalc 1.0.3
Input Parameters
Project Name 3525 SC PLAZA EX
Subarea ID 1A
Area (ac) 0.65
Flow Path Length (ft) 343.0
Flow Path Slope (vft/hft) 0.01
50-yr Rainfall Depth (in) 6.6
Percent Impervious 0.8
Soil Type 20
Design Storm Frequency 50-yr
Fire Factor 0.34
LID False
Output Results
Modeled (50-yr) Rainfall Depth (in) 6.6
Peak Intensity (in/hr) 3.9377
Undeveloped Runoff Coefficient (Cu) 0.6585
Developed Runoff Coefficient (Cd) 0.8517
Time of Concentration (min) 5.0
Clear Peak Flow Rate (cfs) 2.18
Burned Peak Flow Rate (cfs) 2.233
24-Hr Clear Runoff Volume (ac-ft) 0.2677
24-Hr Clear Runoff Volume (cu-ft) 11662.659
1.f
Packet Pg. 224
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Peak Flow Hydrologic Analysis
File location: F:/Job Files/3525- IHOP/Civil/Hydrology/Calculations/Existing/Output/3525 SC PLAZA EX Report.pdf Version: HydroCalc 1.0.3
Input Parameters
Project Name 3525 SC PLAZA EX
Subarea ID 2A
Area (ac) 2.18
Flow Path Length (ft) 374.0
Flow Path Slope (vft/hft) 0.01
50-yr Rainfall Depth (in) 6.6
Percent Impervious 0.87
Soil Type 20
Design Storm Frequency 50-yr
Fire Factor 0.34
LID False
Output Results
Modeled (50-yr) Rainfall Depth (in) 6.6
Peak Intensity (in/hr) 3.9377
Undeveloped Runoff Coefficient (Cu) 0.6585
Developed Runoff Coefficient (Cd) 0.8686
Time of Concentration (min) 5.0
Clear Peak Flow Rate (cfs) 7.4564
Burned Peak Flow Rate (cfs) 7.6141
24-Hr Clear Runoff Volume (ac-ft) 0.9582
24-Hr Clear Runoff Volume (cu-ft) 41740.5938
1.f
Packet Pg. 225
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Peak Flow Hydrologic Analysis
File location: F:/Job Files/3525- IHOP/Civil/Hydrology/Calculations/Existing/Output/3525 SC PLAZA EX Report.pdf Version: HydroCalc 1.0.3
Input Parameters
Project Name 3525 SC PLAZA EX
Subarea ID 3A
Area (ac) 2.04
Flow Path Length (ft) 740.0
Flow Path Slope (vft/hft) 0.01
50-yr Rainfall Depth (in) 6.6
Percent Impervious 0.82
Soil Type 20
Design Storm Frequency 50-yr
Fire Factor 0.34
LID False
Output Results
Modeled (50-yr) Rainfall Depth (in) 6.6
Peak Intensity (in/hr) 2.9872
Undeveloped Runoff Coefficient (Cu) 0.6054
Developed Runoff Coefficient (Cd) 0.847
Time of Concentration (min) 9.0
Clear Peak Flow Rate (cfs) 5.1614
Burned Peak Flow Rate (cfs) 5.2865
24-Hr Clear Runoff Volume (ac-ft) 0.8562
24-Hr Clear Runoff Volume (cu-ft) 37296.2203
1.f
Packet Pg. 226
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
Section 2.0
HYDROLOGIC CALCULATIONS
(PROPOSED CONDITIONS - HYDROCALC CALCULATOR)
1.f
Packet Pg. 227
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Peak Flow Hydrologic Analysis
File location: F:/Job Files/3525- IHOP/Civil/Hydrology/Calculations/Proposed/Output/3525 PROP Report.pdf Version: HydroCalc 1.0.3
Input Parameters
Project Name 3525 PROP
Subarea ID 1A
Area (ac) 2.83
Flow Path Length (ft) 417.0
Flow Path Slope (vft/hft) 0.01
50-yr Rainfall Depth (in) 6.6
Percent Impervious 0.84557318
Soil Type 20
Design Storm Frequency 50-yr
Fire Factor 0.34
LID False
Output Results
Modeled (50-yr) Rainfall Depth (in) 6.6
Peak Intensity (in/hr) 3.6144
Undeveloped Runoff Coefficient (Cu) 0.6406
Developed Runoff Coefficient (Cd) 0.8599
Time of Concentration (min) 6.0
Clear Peak Flow Rate (cfs) 8.796
Burned Peak Flow Rate (cfs) 8.9939
24-Hr Clear Runoff Volume (ac-ft) 1.2166
24-Hr Clear Runoff Volume (cu-ft) 52993.7042
1.f
Packet Pg. 228
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Peak Flow Hydrologic Analysis
File location: F:/Job Files/3525- IHOP/Civil/Hydrology/Calculations/Proposed/Output/3525 PROP Report.pdf Version: HydroCalc 1.0.3
Input Parameters
Project Name 3525 PROP
Subarea ID 2A
Area (ac) 2.04
Flow Path Length (ft) 740.0
Flow Path Slope (vft/hft) 0.01
50-yr Rainfall Depth (in) 6.6
Percent Impervious 0.957041515
Soil Type 20
Design Storm Frequency 50-yr
Fire Factor 0.34
LID False
Output Results
Modeled (50-yr) Rainfall Depth (in) 6.6
Peak Intensity (in/hr) 3.1573
Undeveloped Runoff Coefficient (Cu) 0.6153
Developed Runoff Coefficient (Cd) 0.8878
Time of Concentration (min) 8.0
Clear Peak Flow Rate (cfs) 5.718
Burned Peak Flow Rate (cfs) 5.8158
24-Hr Clear Runoff Volume (ac-ft) 0.9668
24-Hr Clear Runoff Volume (cu-ft) 42113.9065
1.f
Packet Pg. 229
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
Section 3.0
LOW IMPACT DEVELOPMENT CALCULATIONS
(85th PERCENTILE STORM - HYDROCALC CALCULATOR)
1.f
Packet Pg. 230
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Peak Flow Hydrologic Analysis
File location: F:/Job Files/3525- IHOP/Civil/Hydrology/Calculations/LID/Output/3525 SC PLAZA LID Report.pdf Version: HydroCalc 1.0.3
Input Parameters
Project Name 3525 SC PLAZA LID
Subarea ID 1A
Area (ac) 2.04
Flow Path Length (ft) 740.0
Flow Path Slope (vft/hft) 0.01
85th Percentile Rainfall Depth (in) 0.95
Percent Impervious 0.82
Soil Type 20
Design Storm Frequency 85th percentile storm
Fire Factor 0.34
LID True
Output Results
Modeled (85th percentile storm) Rainfall Depth (in) 0.95 Peak Intensity (in/hr) 0.2271
Undeveloped Runoff Coefficient (Cu) 0.1
Developed Runoff Coefficient (Cd) 0.756
Time of Concentration (min) 35.0
Clear Peak Flow Rate (cfs) 0.3503
Burned Peak Flow Rate (cfs) 0.3584
24-Hr Clear Runoff Volume (ac-ft) 0.1211
24-Hr Clear Runoff Volume (cu-ft) 5274.5435
1.f
Packet Pg. 231
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) STORM
WATER
NO HEAVY
Equipment Required
DETENTION / INFILTRATION
A new approach to underground stormwater storage, infiltration, treatment, harvesting or other stormwater management needs, subject to availability.
Potential LEED® credits for Sustainable Sites (6.1, 6.2), Materials & Resources (4, 5 in CA, AZ, NV , OR, UT) and Water Efficiency (1, 3)
Reshaping the Future of
Stormwater Management
1.f
Packet Pg. 232
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Modular Polypropylene Cubes for Underground Water Storage CUDO components snap together, forming a single or
multiple stack. Assembled stacks are installed to form
the desired system size and shape, with a maximum
amount of footprint flexibility.
Cubes incorporate an arched design that adds structural integrity, increased water storage and enhanced access for inspection and maintenance. Made in the USA of injection molded polypropylene plastic, a single CUDO assembly
requires just two modules and two end caps.
Per application, either a filter fabric or plastic liner is wrapped around the CUDO modules, encasing the entire
system. Geo-grid or other structural enhancement may be incorporated into the CUDO installation, depending on the loading requirements.
FEATURES AND BENEFITS
• Large interior openings offer ease of access for
inspection and maintenance
• High water storage capacity (95%)
• CUDO size (24” x 24” x 24”) offers ease of handling
and installation
• Unique shape offers superior strength
• Minimal number of components required
for assembly
• May be integrated into bioretention systems
(rain gardens)
NO HEAVY
Equipment Required
(800) 579-8819
oldcastleinfrastructure.com
1.f
Packet Pg. 233
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
Section 4.0
HYDRAULIC CALCULATIONS
1.f
Packet Pg. 234
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project) Date: 04/14/23
Job: 3525 Santa Clarita Plaza
Hydraulic Calculations
Formula: Q= 50-yr Flow (cfs)
k'= 0.498 (at full capacity, See Hydraulic Table)
n= 0.009/0.013 (PVC/RCP, Mannings Roughness Coeff.)
b= Pipe Diameter (ft)
s= Slope of Pipe (ft/ft)
D= Flow Depth (ft)
A= Flow Area (ft2)
f'= Hydraulic Constant, see Hydraulic Table
v= flow velocity (ft/s)
d'= Depth Ratio, See Hydraulic Table
Line Q50 (cfs) b (in) s (ft/ft) k' d' D (ft) f' A (ft2) v (ft/s) QMAX (cfs) 1A 5.82 10 0.093 0.279 0.56 0.47 0.4626 0.321 18.1 10.38 1 of 1
1.f
Packet Pg. 235
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
1.f
Packet Pg. 236
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
Appendix A
HYDROLOGY/LOW IMPACT DEVELOPMENT MAP
1.f
Packet Pg. 237
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
1.f
Packet Pg. 238
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
1.f
Packet Pg. 239
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
1.f
Packet Pg. 240
Attachment: CEQA Notice of Exemption (Appeal of the Promenade Flats Mixed Use Project)
CITY OF SANTA CLARITA
COMMUNITY DEVELOPMENT DEPARTMENT
23920 Valencia Boulevard, Suite 302
Santa Clarita, CA 91355
Published: The Signal, August 6, 2024
NOTICE OF PUBLIC HEARING TO CONSIDER APPEALS OF PLANNING COMMISSION DECISION FOR MASTER CASE 21-086
APPLICATION: Appeal 24-003 and Appeal 24-004 regarding Master Case 21-086: Minor Use Permit 21-012, Architectural Design Review 21-015, and Development Review 21-011
PROJECT LOCATION: 26111-26135 Bouquet Canyon Road
(Assessor’s Parcel Numbers 2811-003-016, -017, and -018)
PROJECT APPLICANT: Harvard 826 Property, LLC
PROJECT DESCRIPTION: The applicant, Harvard 826 Property, LLC, is requesting a Minor Use Permit (MUP) to construct the Promenade Flats Mixed -Use Project on a 1.2- acre site at 26111 -26135 Bouquet Canyon Road. The project would construct a new four -story mixed-use building in the parking lot behind the existing IHOP restaurant , and would also construct a new parking lot on vacant land in the southwest corner of the commercial center. The new building would include 7,234 square feet of commercial space on the first f loor with 30 one -bedroom apartments on the upper floors, along with rooftop amenity space for residents. Four of the apartments would be live- work units, providing an additional 1,640 square feet of commercial space. The project site is within the Mixed -Use Corridor zone. On April 17, 2024, an administrative hearing was conducted for the proposed project and Master Case 21 -086 was approved by the Hearing Officer.
PLANNING COMMISSION ACTION: The Hearing Officer decision was appealed to the Planning Commission, and on June 18, 2024, the Planning Commission voted 4- 1 to deny the appeal and affirm the Hearing Officer decision. On July 1, 2024, Appeal 24- 003 was filed by Cornerstone Realty Advisors on behalf of Cinema Park, LLC, and on July 3, 2024, Appeal 24-004 was filed by Luna & Glushon, on behalf of Las Flores Apartments, LLC. Therefore, the City Council will conduct a public hearing on this matter on the following date:
DATE: Tuesday, August 27, 2024
TIME: At or after 6:00 p.m.
LOCATION: City Hall, Council Chambers
23920 Valencia Blvd., First Floor
Santa Clarita, CA 91355
ENVIRONMENTAL REVIEW: The project is exempt from the California Environmental Quality Act as a Class 32 In -Fill Development Projects exemption, pursuant to Article 19 Categorical E xemptions, Section 15332. A Class 32 exemption consists of projects characterized as in-fill development.
If you wish to challenge the action taken on this matter in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or written correspondence delivered to the City of Santa Clarita at, or prior to, the public hearings.
For further information regarding this proposal, you may contact the project planner at the City of Santa Clarita, Permit Center, 23920 Valencia Blvd., Suite 140, Santa Clarita, CA 91355. Telephone: (661) 255- 4330. Website: www.santa -clarita.com/planning. Send written correspondence to: 23920 Valencia Blvd., Suite 302, Santa Clarita, CA 91355. Project Planner: Andy Olson, [email protected].
Mary Cusick, MMC
City Clerk
1.g
Packet Pg. 241
Attachment: Public Notice (Appeal of the Promenade Flats Mixed Use Project)
PROPOSED PROJECT SITE
Master Case 21-086: Promenade Flats Mixed Use Project
26111-26135 Bouquet Canyon Road
(Assessor’s Parcel Numbers 2811-003-016, -017, and -018) Project Site
Cinema Drive
1.g
Packet Pg. 242
Attachment: Public Notice (Appeal of the Promenade Flats Mixed Use Project)
CITY OF SANTA CLARITA
City Council
Regular Meeting
Joint Meeting with
Board of Library Trustees
Hereinafter the titles Mayor, Mayor Pro Tem, Councilmember, City Manager, City Attorney, and City Clerk may be used also to indicate Mayor/Chair/President, Mayor Pro Tem/Vice-Chair/Vice President, City Manager/Executive Director, City Attorney/Counsel, and City Clerk/Secretary ~Minutes~
Tuesday, July 9, 2024 6:00 PM City Council Chambers
INVOCATION
Councilmember Weste delivered the invocation.
CALL TO ORDER
Mayor Smyth called to order the Joint Regular meeting of the City Council and Board of Library Trustees at 6:06 p.m.
ROLL CALL
All council members were present.
FLAG SALUTE
Councilmember Weste led the flag salute.
EXECUTIVE MEETING
This time has been set aside for Councilmembers to review the agenda and obtain any further information that may be needed. Council will also discuss each individual item during the course of the meeting with the exception of the Consent Calendar, which may be approved in its entirety by one motion, unless there is a request to pull an item for discussion. No action will be taken on public agenda items during the Executive Meeting.
Councilwoman McLean requested an amendment on the June 25, 2024, Regular Meeting Minutes.
AWARDS AND RECOGNITIONS
Councilmember Weste spoke on the tragic accident that occurred on Sand Canyon Road involving two horses and their riders. Councilmember Weste commended Dr. Rachael Sachar from TwinOaks Equine Veterinary Services and longtime resident Avetik Aladzhadzhyan for their combined efforts in rushing to attend to the horses and the respectful care they provided.
Councilmember Weste commented that these acts of compassion truly exemplify the strength of 2 Packet Pg. 243
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
our community and its commitment to the welfare and safety of all residents and invited Dr.
Rachael Sachar and Avetik Aladzhadzhyan to the dais to take a photo and receive a certificate from Stephanie English representing Supervisor Barger’s office.
Addressing the Council was Linda Storli representing the William S. Hart Union High School District who thanked Dan Watson for his service.
Councilmember Gibbs recognized Dan Watson, a talented photographer, who not only captured important news moments in our City, but also the essence of the community. Councilmember Gibbs thanked Dan Watson for capturing so many pivotal moments in our City’s history, and invited Dan, who was joined by family and members of the community in celebration of his service, to the dais to take a photo and receive a certificate and special gift.
Councilwoman McLean expressed her appreciation for Dan's talented work and years of dedication and wished Dan and his wife the very best as he embarks upon his retirement.
Mayor Smyth thanked Dan for his years of service and sense of humor; mentioned that the City of Santa Clarita is a much better place because of Dan and the work he has done; and wished Dan the best in his retirement.
Mayor Pro Tem Miranda requested an exhibit of Dan's work be displayed within the City of Santa Clarita for the community to enjoy.
Councilmember Weste read a small excerpt on the Watson Family history and commented that the City would be honored to have an exhibit of pictures from the Watson family displayed in the City of Santa Clarita.
PRESENTATIONS
Mayor Smyth introduced the City of Santa Clarita's 2024 Public Opinion Poll, and Senior Management Analyst Tyler Pledger presented the findings.
Councilmember Weste commented that this was a great presentation.
PUBLIC PARTICIPATION
Addressing the Council were Douglas (no last name provided) regarding the new library screens and filing candidate forms for November election; Cindy Josten regarding voting in the November election; Mike Lebecki expressing his appreciation for the City Council and the College of the Canyons Board of Trustees; Nancy (no last name provided) regarding the November election; Roland La Bass regarding parking at the Canine Country Park; Di Zimmerman on behalf of Tony Maldonado regarding transparency and voting; Cher Gilmore and Ashe Mahoney regarding Earth Day celebrations; and Glenda Yakel regarding green waste, transparency, and the public opinion poll.
STAFF COMMENTS
Mayor Smyth commented that the City Clerk's Office would address questions regarding the filing and processing of candidate forms for the upcoming election. 2 Packet Pg. 244
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
Councilwoman McLean inquired as to whether the City was looking into having an environmental expo, and City Manager Ken Striplin responded that staff is looking into incorporating Earth Day into a future City event in spring 2025.
COMMITTEE REPORTS/COUNCILMEMBER COMMENTS
Councilwoman McLean urged members of the community to read non-partisan agency reviews of propositions slated for the November ballot, as some were seeking billions of dollars in bonds, acquiring more state debt, and requiring tax payers to pay for them. Councilwoman McLean mentioned that at the last City Council meeting she suggested the formation of an ad hoc committee for LA 2028 and thanked staff for the memo that outlines potential opportunities; however, she seeks consensus from Council for an item to be placed on the agenda for the August 27, 2024, City Council meeting to discuss how the City may be involved in the Olympics. Councilmember Gibbs requested a presentation of the options available be conducted at the August Council meeting by LA 2028 staff; Mayor Smyth confirmed consensus, and suggested that there may be opportunities, whether that would be for Olympic or Paralympic games. City Manager Ken Striplin confirmed Council’s direction to proceed with the item at the August City Council meeting whether or not LA 2028 staff are available for a presentation, and Council concurred. Councilwoman McLean spoke on the Fourth of July festivities and how she enjoyed seeing all the families and children at the event; spoke of the high-speed rail board meeting in which the Burbank to Palmdale section was approved, implementation is yet to be determined, and is looking forward to working with them on the impacts, including Bee Canyon.
Councilwoman McLean provided the adjournment in memory of Andrew Pontious, a Los Angeles County firefighter.
Councilmember Gibbs requested that City staff engage with Saugus Unified School District regarding the Santa Clarita Elementary school site and the potential opportunity for a library or community center; he suggested that if the public wished to provide input, they can attend the 7- 11 committee meetings. Councilmember Weste and Councilwoman McLean concurred.
Mayor Pro Tem Miranda spoke of staying cool during the summer and recent hot temperatures, mentioning the several City locations the public can visit to beat the heat: the three Santa Clarita Public Library branches offering not only cool comfort but also books, internet access, and other resources; the City’s eight public pools, including the three at the Santa Clarita Aquatic Center; and The Cube Ice and Entertainment Center.
Councilmember Weste agreed with Mayor Pro Tem Miranda’s comments; thanked the Elks club for passing out flags during the Fourth of July parade; and asked the community to consider the increasing levels in crime all over Los Angeles County when voting for the District Attorney in November and to remember why we vote, which is for the next generation. 2 Packet Pg. 245
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
UNFINISHED BUSINESS
ITEM 1
CENTRAL PARK BUILDOUT - RIVER OF LIGHTS, PROJECT P4033
This item considers award of the construction contract for the Central Park River of Lights project. The project would include decorative lighting in the plaza and on the hillside adjacent to the exercise stairs.
RECOMMENDED ACTION:
City Council receive a presentation on the Central Park River of Lights, Project P4033, review the two options presented, and provide direction to staff to proceed with Option One or Option Two.
Assistant City Engineer Shannon Picket provided the staff report.
Addressing the Council was Di Zimmerman on behalf of Tony Maldonado. Mayor Smyth responded to the public comments as misleading, offensive and wrong, and invited Mr.
Maldonado to address the Council directly.
Councilmember Weste commented that she was excited to finish the park with the lights and art piece and commended City staff for doing a marvelous job. She mentioned that Central Park is important for the community and was proud to support the project, which is becoming a vibrant place for family fun and celebrations, where the City’s water is treated and will provide an educational opportunity, and mentioned that Central Park will be an area used for different organizations for events and parking.
Councilmember Gibbs commented on the City being called the City of the Arts and believed that Central Park could be one of the biggest art pieces the City has ever done. He also mentioned that to be in a City that has been managed in a way that allows the opportunity to do something like Central Park and the buildout is incredible.
Councilwoman McLean commented that the amount of money to complete Central Park is significant; confirmed with City Manager Ken Striplin the City has the money available; clarified for the community that there is money set aside for certain things and there are certain things the City was not allowed to take money away from to spend on something else; stated that the City Council fully supports the Senior Center; and confirmed that the funding taken away from the Senior Center was a state reduction, not the City, and the state had the ability not to do what they did, but the state did it anyway.
Mayor Smyth commented that because of the City’s fiscal health and due to the Sheriff’s Station coming in under budget, the City is able to offset some of the costs and mentioned that Central Park has become a focal point of the City.
On a roll call vote Council approved option two of proceeding with the River of Lights Project and appropriating funds as identified in the fiscal impact. 2 Packet Pg. 246
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
RESULT: APPROVED [UNANIMOUS]
MOVER: Laurene Weste, Councilmember
SECONDER: Jason Gibbs, Councilmember
AYES: Smyth, Miranda, Gibbs, McLean, Weste
ITEM 2
MASTER AGREEMENT AND ASSOCIATED DOCUMENTS FOR THE TRANSFER OF WILLIAM S. HART REGIONAL PARK
The purpose of this items is to approve assuming ownership and operations of Williams S. Hart Regional Park from the County of Los Angeles.
RECOMMENDED ACTION:
City Council:
1. Authorize the City Manager or designee to execute the Master Agreement and associated documents, subject to City Attorney approval.
2. Adopt a resolution approving the transfer of William S. Hart Regional Park from the County of Los Angeles to the City of Santa Clarita.
3. Appropriate $174,706 in Fiscal Year 2024-2025 as outlined in Exhibit A from the Library Fund (Fund 309) and General Fund (Fund 100).
4. Appropriate one-time funding in the amount of $220,000 from the General Fund (Fund 100) for expenses related to the transfer of Hart Park to Hart Park Expenditure Account (1008300- 516101).
5. Find this action exempt from review under the California Environmental Quality Act (CEQA) pursuant to (Public Resources Code §§ 21000, et seq. “CEQA”) and the regulations promulgated thereunder (14 Cal. Code of Regs. §§ 15000, et seq., the “CEQA Guidelines”).
Addressing the Council were Becki Basham, Lois Bauccio, Cindy Josten, Nancy (no last name provided), Leon Worden, Di Zimmerman, Jim Ventress, Carol Rock.
One written comment was received.
Mayor Pro Tem Miranda thanked Alan Pollock for all he has done for the City and thanked Councilmember Weste for the idea of bringing William S. Hart Regional Park under the City’s control.
City Manager Ken Striplin remarked that the concept of William S. Hart Park coming under the City umbrella has been discussed for 35 years, and until now the timing was not right; commented that Supervisor Kathryn Barger was very receptive and has been a tremendous leader throughout the project, complementing the leadership and direction from Council. Mr. Striplin also thanked Stephanie English and Supervisor Barger’s staff for a productive process and 2 Packet Pg. 247
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
commented that Supervisor Barger will continue to lead this project through the County Board of Supervisors and ultimately transferred to the City of Santa Clarita.
Administrative Analyst Amber Rodriguez provided the presentation.
Mayor Smyth inquired as to whether the City was accounting for the cost to upgrade the previous Senior Center property, and Mr. Striplin responded that the three-phase funding plan deals with assuming the operations of William S. Hart Park, and the Senior Center would be a future capital project once the use study is done. Mr. Striplin also stated that the issues raised by speakers are addressed in the transfer documents: the barnyard was not going away and the City is creating staff positions to provide those services.
Mayor Pro Tem Miranda requested clarification of language in the negotiated terms regarding use the former Senior Center, and Mr. Striplin responded that the location will be a community recreational and arts center, not a community center.
Councilmember Weste stated that William S. Hart Park will be a wonderful place for the community and will leave a legacy for everyone. Councilmember Weste thanked the City Council for going through the long process; remarked that she is so excited for the City; thanked Mr. Striplin and staff; and with profound gratitude offered her motion to accept the transfer William. S. Hart Park to the City.
Councilmember Gibbs inquired as to the timing of the curator and supervisor positions, and Mr.
Striplin responded that the phasing plan anticipates taking over the park on July 1, 2025; therefore, staff who will be at the park location will already be hired, onboarded, and have shadowed County staff prior to that. The museum positions recruitment will begin in three to four months, and the second phase will involve maintenance staff recruitment. Councilmember Gibbs complimented staff; thanked Supervisor Barger and her team; and expressed how proud he was to second the motion.
Councilwoman McLean mentioned that she initially had questions regarding the barnyard and bison, but is pleased they are included in the plan as they are such an asset. She commented that the current park employees were fabulous, and anything to make the William S. Hart Park the City’s park is a great thing. Councilwoman McLean reflected on taking a class on indigenous peoples of California and as point of information stated that there were thirty-two tribes in the southern region of California and bringing the culture over to the City of Santa Clarita is a wonderful thing and was happy to support this item.
Mayor Smyth agreed that the William S. Hart Park is a legacy item for the Council, City, and Supervisor Barger, and for the City to make the transition and investment, the park will be great asset for the community.
Adopted Resolution No. 24-48
2 Packet Pg. 248
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
RESULT: APPROVED [UNANIMOUS]
MOVER: Laurene Weste, Councilmember
SECONDER: Jason Gibbs, Councilmember
AYES: Smyth, Miranda, Gibbs, McLean, Weste
CONSENT CALENDAR
RESULT: APPROVED [UNANIMOUS]
MOVER: Jason Gibbs, Councilmember
SECONDER: Bill Miranda, Mayor Pro Tem
AYES: Smyth, Miranda, Gibbs, McLean, Weste
ITEM 3
APPROVAL OF SPECIAL MEETING MINUTES – The minutes are submitted for approval.
RECOMMENDED ACTION: City Council approve the minutes of the June 25, 2024, Special Meeting
ITEM 4
APPROVAL OF REGULAR MEETING MINUTES – The minutes are submitted for approval.
RECOMMENDED ACTION: City Council approve the minutes of the June 25, 2024, Regular Meeting
ITEM 5
CHECK REGISTER NO. 14
Check Register No. 14 for Period 05/31/24 through 06/13/24 and 06/20/24. Electronic Funds Transfers for the Period 06/03/24 through 06/14/24.
RECOMMENDED ACTION:
City Council approve and ratify for payment the demands presented in Check Register No. 14.
ITEM 6
BACKFLOW PREVENTION DEVICE TESTING AND REPAIRS CONTRACT Council consideration to award a contract for backflow servicing across Landscape Maintenance District Zones and City-owned facilities.
RECOMMENDED ACTION:
City Council:
1. Award a two-year contract to Backflow Prevention Device Tester to provide testing, maintenance, and repair services for all City-owned backflow prevention devices in the annual amount of $245,372, for a total two-year contract in an amount not to exceed $490,744.
2. Authorize the City Manager or designee to execute up to three annual renewal options, not to exceed the annual contract amount, contingent upon the appropriation of funds in the annual 2 Packet Pg. 249
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
budget for such fiscal years.
3. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.
ITEM 7
VENTURA COUNTY RIGHT-OF-WAY USE AGREEMENT
Approval for a Right-of-Way Use Agreement with the County of Ventura in exchange for two dark fiber strands that may be used to create network redundancy for the City's Fiber Optic Network.
RECOMMENDED ACTION:
City Council:
1. Approve a Right-of-Way Use Agreement with the County of Ventura in exchange for two dedicated dark fiber strands for City use along the Ventura County’s 46-mile regional network.
2. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.
ITEM 8
CITYWIDE PRINTERS AND COPIERS CONTRACT
Council consideration to award a five-year contract to Kyocera Document Solutions West, LLC, for managed print services.
RECOMMENDED ACTION:
City Council:
1. Approve the use of a cooperative agreement through OMNIA Partners contract #R191102; award a five-year contract to Kyocera Document Solutions West, LLC, for managed print services in the amount of $730,150; and authorize a contingency of $109,522 for a total contract amount not to exceed $839,672.
2. Authorize the City Manager or designee to execute up to two additional one-year renewal options, not to exceed the annual contract amount, inclusive of contingency, plus an adjustment in compensation consistent with the appropriate Consumer Price Index, and contingent upon the appropriation of funds by the City Council in the annual budget for such fiscal year.
3. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.
2 Packet Pg. 250
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
ITEM 9
RESOLUTION DESIGNATING OFFICIALS AUTHORIZED TO FILE APPLICATIONS TO
THE CALIFORNIA GOVERNOR'S OFFICE OF EMERGENCY SERVICES FOR
DISASTER-RELATED FINANCIAL ASSISTANCE
The resolution authorizes City Council to designate approved agents every three years to execute and file applications to the California Governor's Office of Emergency Services (Cal OES) as required by the Robert T. Stafford Disaster Relief and Emergency Assistance Act.
RECOMMENDED ACTION:
City Council adopt a resolution designating the City Manager, Assistant City Manager, and Intergovernmental Relations Officer as approved agents with the California Governor’s Office of Emergency Services (Cal OES) for disaster related financial assistance and authorize staff to provide Cal OES with a certified copy of the resolution.
Adopted Resolution No. 24-49
ITEM 10
SECOND READING OF AN ORDINANCE FOR THE TOWN CENTER SPECIFIC PLAN Second reading of an ordinance to amend the City of Santa Clarita’s zoning map and zoning designation as it relates to the Town Center Specific Plan.
RECOMMENDED ACTION:
City Council conduct a second reading and adopt an ordinance entitled: “AN ORDINANCE OF
THE CITY COUNCIL OF THE CITY OF SANTA CLARITA, CALIFORNIA, APPROVING ZONE CHANGE 22-001, AND SPECIFIC PLAN 22-002 (MASTER CASE 22-105) TO AMEND THE CITY OF SANTA CLARITA’S ZONING MAP AND CHANGE THE ZONING DESIGNATION OF ASSOCIATED ASSESSOR’S PARCEL NUMBERS FROM REGIONAL COMMERCIAL TO SPECIFIC PLAN.”
Adopted Ord. No. 24-03
ITEM 11
2024 ANIMAL CARE GRANT AWARD RECOMMENDATIONS
City Council consideration to approve the 2024 Animal Care Grant Program funding recommendations by the Grants Committee.
RECOMMENDED ACTION:
City Council:
1. Approve the 2024 Animal Care Grant Committee’s funding recommendations in an amount not to exceed $10,000 per grantee, for a total amount not to exceed $40,000.
2. Direct staff to execute Grant Agreements with the agencies approved for funding.
3. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.
2 Packet Pg. 251
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
Addressing the Council was Nancy (no last name provided).
Councilmember Weste agreed with the speaker’s comments and requested staff to look at ability to have trapped animals spayed and neutered.
ITEM 12
CORRECTED TAX-SHARING RESOLUTIONS FOR SANITATION DISTRICT, ANNEXATION NOS. SCV-1120, SCV-1130, SCV-1132, AND SCV-1133 The Santa Clarita Valley Sanitation District provides wastewater treatment services within the District's service area. To provide wastewater treatment service to properties located outside the District's service area, the boundary must be expanded through the annexation process. The District has requested the City adopt amended resolutions for four previously approved annexations.
RECOMMENDED ACTION:
City Council:
1. Rescind resolutions Nos. 23-21, 23-22, 23-23, 23-73, 23-74, 23-78, 23-79, 23-80, 23-81, and 23-82 that approved and accepted the negotiated exchange of property tax revenues resulting from Santa Clarita Valley Sanitation District Annexation Nos. SCV-1120, SCV-1130, SCV- 1132, and SCV-1133.
2. Adopt the Santa Clarita Valley Sanitation District's corrected resolutions approving and accepting the negotiated exchange of property tax revenues resulting from Santa Clarita Valley Sanitation District Annexation Nos. SCV-1120, SCV-1130, SCV-1132, and SCV- 1133.
3. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.
Adopted Resolution Nos. 24-50, 51, 52, 53, 54, 55, 56, 57, 58, 59 ITEM 13
2024 DEBRIS MANAGEMENT PLAN FOR DISASTER DEBRIS REMOVAL This item is to comply with the Disaster Mitigation Act of 2000, by adopting a Debris Management Plan for removal activities as a result of a major, citywide disaster.
RECOMMENDED ACTION:
City Council adopt a resolution for the 2024 Debris Management Plan for Disaster Debris Removal.
Adopted Resolution No. 24-60
2 Packet Pg. 252
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
ITEM 14
OLD ORCHARD PARK PHASE I IMPROVEMENTS, PROJECT P2020 - PLANS AND
SPECIFICATIONS, AND CONSTRUCTION CONTRACT
This action will award the construction contract for the phase I improvements to Old Orchard Park. The project will consist of an expanded playground area with features including new play equipment for 2 to 5 year and 5 to 12 year age groups, climbing rock structure, turf slide hill, rubberized surfacing and shade structure. Addition of a multi-sport court, recreation elements, multi-purpose room/restroom building improvements, parking lot expansion and other recreational and landscape upgrades.
RECOMMENDED ACTION:
City Council:
1. Approve the plans and specifications for Old Orchard Park Phase I Construction Project P2020.
2. Award a construction contract to Golden Sun Enterprise, Inc., in the amount of $5,917,777 for the base bid, and authorize a contingency in the amount of $1,183,555, for a total contract amount not to exceed $7,101,332.
3. Award a materials testing contract to Kane Construction Services, Inc., in the amount of $318,868, and authorize a contingency in the amount of $31,886, for a total contract amount not to exceed $350,754.
4. Extend the current $300,000 contract and authorize an increased expenditure for construction management support with Pacific Coast Land Design, Inc., in the amount of $181,789, and authorize a contingency in the amount of $18,178, for a total contract amount not to exceed $499,967.
5. Appropriate one-time funds in the amount of $2,531,307 from the Facilities Fund (Fund 723) to the Old Orchard Park Project P2020, expenditure account P2020601-516101.
6. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.
X
ITEM 15
VALENCIA COMMUNITY CENTER RECONSTRUCTION AND TENANT
IMPROVEMENTS
This item considers an award for construction contract for The Valencia Community Center reconstruction and tenant improvements.
RECOMMENDED ACTION:
City Council:
1. Approve the plans and specifications for the Valencia Community Center Reconstruction and Tenant Improvements.
2 Packet Pg. 253
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
2. Award a construction contract to Deeb Construction Inc., in the amount of $364,153 and authorize a contingency in the amount of $72,831, for a total contract amount not to exceed $436,984.
3. Approve the use of a “piggyback” contract for the purchase of replacement doors, electrified and mechanical door hardware from Montgomery Hardware Company, through the California Multiple Awards Schedule, (CMAS) contract #4-17-84-0059A in an amount not to exceed $232,822.
4. Find the Valencia Community Center Reconstruction and Tenant Improvements exempt from review under the California Environmental Quality Act pursuant to Title 14 of the California Code of Regulations, Article 19, Section 15301.
5. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.
ITEM 16
ACCEPTANCE OF REAL PROPERTY OF 11.4 +/- ACRES IN THE CITY OF SANTA CLARITA, LOS ANGELES COUNTY ASSESSORS PARCEL NO. 2866-007-079, 2866-007- 080 AND A PORTION OF 2866-007-078
Acquisition of this property will enhance the City's on-going efforts to preserve open space lands in an effort to complete the open space greenbelt surrounding the Santa Clarita Valley.
RECOMMENDED ACTION:
City Council:
1. Accept 11.4 +/- acres of real property for the purpose of public recreation and open space preservation, Assessor's Parcel Numbers 2866-007-079, 2866-007-080 and a portion of 2866-007-078, contingent upon clean title reports and environmental reports.
2. Appropriate $30,000 from the Open Space Preservation District Fund (Fund 358) to the Open Space Preservation District Expenditure Account 3587501-516101 for due diligence, title and escrow.
3. Appropriate ongoing funds in the amount of $4,000 from the Open Space Preservation District Fund (Fund 358) to Open Space Preservation District Expenditure Account 3587501- 511101 for on-going maintenance.
4. Authorize the City Manager to sign the agreement, subject to final approval by the City Manager and City Attorney, and to take such further actions as necessary to effectuate the transfer.
5. The project is exempt from review under the California Environmental Quality Act (Article 9) pursuant to Section 15313 (Class 13); Section 15317 (Class 17); and Section 15325 (Class 25).
2 Packet Pg. 254
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
6. Authorize the City Manager, or designee, to execute all documents, subject to City Attorney approval.
PUBLIC PARTICIPATION II
No additional requests to speak were received.
STAFF COMMENTS
ADJOURNMENT
Mayor Smyth adjourned the Regular Meeting in memory of Andrew Pontious at 8:16 p.m.
FUTURE MEETINGS
______________________________________
MAYOR
ATTEST:
______________________________________
CITY CLERK
2 Packet Pg. 255
Minutes Acceptance: Minutes of Jul 9, 2024 6:00 PM (Consent Calendar)
CITY OF SANTA CLARITA
City Council
Special Meeting
~Minutes~
Monday, August 19, 2024 4:30 PM City Council Chambers
CALL TO ORDER
Mayor Smyth called to order the Special meeting of the City Council at 4:31 p.m.
ROLL CALL
All councilmembers were present.
PUBLIC PARTICIPATION FOR AGENDIZED ITEMS
No requests to speak were received.
CLOSED SESSION
CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Joseph Montes, City Attorney, advised of the need to conduct a Closed Session for the purpose of holding a:
Government Code Section 54956.9(d)(1)
Case Name: City of Santa Clarita v. Canyon View Limited et al.
LASC Case No. PC058773, Appellate Court Case No. B320230
RECESS TO CLOSED SESSION - TO BE HELD IN THE CARL BOYER ROOM Mayor Smyth recessed the meeting to Closed Session at 4:31 p.m.
RECONVENE TO OPEN SESSION
Mayor Smyth reconvened the meeting to Open Session at 5:04 p.m.
CITY ATTORNEY ANNOUNCEMENT
City Attorney Joseph Montes announced that no action was taken in Closed Session that was required to be reported.
ADJOURN
Mayor Smyth adjourned the Special Meeting at 5:04 p.m.
3 Packet Pg. 256
Minutes Acceptance: Minutes of Aug 19, 2024 4:30 PM (Consent Calendar)
______________________________________
MAYOR
ATTEST:
______________________________________
CITY CLERK
3 Packet Pg. 257
Minutes Acceptance: Minutes of Aug 19, 2024 4:30 PM (Consent Calendar)
CITY OF SANTA CLARITA
City Council
Special Meeting
~Minutes~
Monday, August 19, 2024 5:00 PM City Council Chambers
CALL TO ORDER
Mayor Smyth called to order the Special meeting of the City Council at 5:04 p.m.
ROLL CALL
All Councilmembers were present.
FLAG SALUTE
Mayor Smyth led the flag salute.
PUBLIC PARTICIPATION FOR AGENDIZED ITEMS (ONE MINUTE LIMIT) No requests to speak were received.
CITY COUNCIL AGENDA ITEMS
ITEM 1
SANTA CLARITA DISTRICT 3 GENERAL MUNICIPAL ELECTION - NOVEMBER 5, 2024
City Council consideration of course of action to be taken regarding the District 3 seat as a result of only one nominee at close of the nomination period.
RECOMMENDED ACTION:
City Council receive presentation and determine whether to move forward with the election for District 3 with only one candidate listed on the ballot, or adopt a resolution canceling the election for District 3 and appointing Jason Gibbs, the sole nominee for District 3, to the four-year District 3 Council seat term which begins in December 2024 with an estimated cost savings of $120,000 for the City.
City Clerk Mary Cusick provided the presentation.
Mayor Pro Tem Miranda commented on saving the City $120,000 by appointing Jason Gibbs.
Mayor Smyth inquired, and City Clerk Mary Cusick confirmed, no other person may be appointed to the City Council seat. Mayor Smyth observed whether this was the democracy the plaintiffs were looking for where there are no challengers in one district and only three in the 4 Packet Pg. 258
Minutes Acceptance: Minutes of Aug 19, 2024 5:00 PM (Consent Calendar)
other as opposed to previous at-large elections where there were multiple candidates across all areas of the City and demographics wanting to run. Mayor Smyth offered his congratulations to Councilmember Gibbs and shared Council's support in moving forward with his appointment.
Councilwoman Mclean mentioned that Councilmember Gibbs had been a great Councilmember representing the City and their residents equally and knows he will continue to do so. She also remarked that there was no reason to spend $120,000 on an election, when the City has had to spend a whole bunch of money to fight the egregious districting that was put upon the City.
Councilwoman McLean asked a hypothetical question regarding a class action lawsuit to which City Attorney Montes responded that there was a lawsuit brought in San Diego County against a city that transitioned to districts; however, the lawsuit was thrown out under the CVRA.
Mr. Montes clarified that the motion was to adopt the resolution, cancel the District 3 election, and appoint Jason Gibbs.
RESULT: APPROVED [UNANIMOUS]
MOVER: Laurene Weste, Councilmember
SECONDER: Marsha McLean, Councilmember
AYES: Smyth, Miranda, Gibbs, McLean, Weste
ADJOURN
Mayor Smyth adjourned the Special Meeting at 5:12 p.m.
______________________________________
MAYOR
ATTEST:
______________________________________
CITY CLERK
4 Packet Pg. 259
Minutes Acceptance: Minutes of Aug 19, 2024 5:00 PM (Consent Calendar)
Agenda Item: 5
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: August 27, 2024
SUBJECT: CHECK REGISTER NOS. 15, 16, AND 17
DEPARTMENT: Administrative Services
PRESENTER: Brittany Houston
RECOMMENDED ACTION
City Council approve and ratify for payment the demands presented in Check Register No. 15, No. 16, and No. 17.
BACKGROUND
Check Register No. 15 for the Period 06/14/24 through 06/27/24 and 07/03/24 in the aggregate amount of $14,152,439.76 inclusive of Electronic Funds Transfers for the Period 06/17/24 through 06/28/24 in the aggregate amount of $1,122,693.70.
Check Register No. 16 for the Period 06/28/24 through 07/11/24 and 07/18/24 in the aggregate amount of $5,394,821.98 inclusive of Electronic Funds Transfers for the Period 07/01/24 through 07/12/24 in the aggregate amount of $1,015,949.90.
Check Register No. 17 for the Period 07/12/24 through 07/25/24 and 08/01/24 in the aggregate amount of $14,649,740.20 inclusive of Electronic Funds Transfers for the Period 07/15/24 through 07/26/24 in the aggregate amount of $2,319,508.77.
FISCAL IMPACT
Adequate funds are available in the budgeted expenditure accounts to support the check register payments.
ATTACHMENTS
Memo - Check Register No. 15
Memo - Check Register No. 16
5 Packet Pg. 260
Memo - Check Register No. 17
Check Register No. 15 (available in the City Clerk's Reading File) Check Register No. 16 (available in the City Clerk's Reading File) Check Register No. 17 (available in the City Clerk's Reading File) 5 Packet Pg. 261
5.a
Packet Pg. 262
Attachment: Memo - Check Register No. 15 (Check Register No. 15, No. 16, & No. 17)
5.a
Packet Pg. 263
Attachment: Memo - Check Register No. 15 (Check Register No. 15, No. 16, & No. 17)
5.a
Packet Pg. 264
Attachment: Memo - Check Register No. 15 (Check Register No. 15, No. 16, & No. 17)
5.b
Packet Pg. 265
Attachment: Memo - Check Register No. 16 (Check Register No. 15, No. 16, & No. 17)
5.b
Packet Pg. 266
Attachment: Memo - Check Register No. 16 (Check Register No. 15, No. 16, & No. 17)
5.b
Packet Pg. 267
Attachment: Memo - Check Register No. 16 (Check Register No. 15, No. 16, & No. 17)
5.b
Packet Pg. 268
Attachment: Memo - Check Register No. 16 (Check Register No. 15, No. 16, & No. 17)
5.c
Packet Pg. 269
Attachment: Memo - Check Register No. 17 (Check Register No. 15, No. 16, & No. 17)
5.c
Packet Pg. 270
Attachment: Memo - Check Register No. 17 (Check Register No. 15, No. 16, & No. 17)
5.c
Packet Pg. 271
Attachment: Memo - Check Register No. 17 (Check Register No. 15, No. 16, & No. 17)
Agenda Item: 6
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: August 27, 2024
SUBJECT: ENVIRONMENTAL IMPACT REPORT FOR WILEY CANYON
DEVELOPMENT PROJECT (MASTER CASE 20-238) CONTRACT
INCREASE
DEPARTMENT: Community Development
PRESENTER: Erika Iverson
RECOMMENDED ACTION
City Council:
1. Authorize an expenditure increase to the Dudek contract for the preparation of the Wiley Canyon Development Project Environmental Impact Report (Master Case 20-238) from $239,960 to $335,200 and include a contingency in the amount of $33,520, for a total contract amount not to exceed $368,720.
2. Authorize the City Manager or designee to execute all documents, subject to City Attorney approval.
BACKGROUND
The Wiley Canyon Development Project (Project), Master Case 20-238, is a request by Wiley Canyon, LLC, (applicant) to develop a mixed-use development consisting of a four-story senior living facility, ground-floor commercial, and 379 apartment units within three planning areas on an approximately 31-acre site east of Interstate 5 and west of Wiley Canyon Road, between Hawkbryn Avenue and Calgrove Boulevard in the community of Newhall, as shown on the attached aerial map. The property is located in the Mixed Use Neighborhood (MX-N) zone and is within the Calgrove Corridor/Smiser Ranch area, which has a maximum allowable development of 830,000 square feet, as identified in the City of Santa Clarita’s (City) General Plan.
The Project was formally submitted on October 28, 2020. An environmental review under the California Environmental Quality Act (CEQA) was initiated. Based on anticipated impacts associated with the Project, the appropriate CEQA document required for the Project is an 6 Packet Pg. 272
Environmental Impact Report (EIR). Because the City does not have the in-house expertise or resources available to complete an EIR, an outside environmental consulting firm is required to complete this task. In August of 2021, staff solicited proposals from qualified firms to prepare the EIR.
On November 9, 2021, the City Council awarded the contract to Dudek for a contract amount of $239,960, with a ten percent contingency of $23,996, for a total contract amount not to exceed $263,956. Since then, the Draft EIR has been prepared and circulated for public review, and two public hearings have been held by the Planning Commission.
The Draft EIR was circulated for a 45-day public review beginning March 1, 2024, and ending April 15, 2024. During the review period, the first Planning Commission meeting was held on March 19, 2024, to provide an introduction to the project proposal and an overview of the Draft EIR. Following the meeting on March 19, 2024, and the close of the public review of the Draft EIR, comments received on the Draft EIR were reviewed and organized, and individual comments were numbered for purposes of preparing responses. Based on comments from the Planning Commission, the applicant made revisions to the site plan. A second Planning Commission meeting was held on June 18, 2024, to provide an overview of the revisions proposed by the applicant, and the Planning Commission continued the hearing process to a date uncertain while the applicant finalizes the site plan, addresses requests for more information from the Planning Commission, and all responses to comments on the Draft EIR are prepared.
CONTRACT AMENDMENT
The original proposal for the preparation of the EIR assumed that no more than 100 individual comments would be received on the Draft EIR. Following the close of the public review and the Planning Commission hearing on March 19, over 500 individual comments were identified.
Preparation of the Final EIR, which will be considered by the Planning Commission at a future hearing, will include responses to all comments that were received on the Draft EIR. In addition, to address site plan changes made by the applicant in response to comments, the Final EIR will include a chapter for changes to the Draft EIR to identify instances where revisions to the Draft EIR are appropriate.
The high volume of individual comments that require a response in the Final EIR and the revisions to the site plan, result in the additional work to be done by the consultant, and therefore the need to update the contract with Dudek. The updated total cost of the Dudek proposal is $335,200. Staff has included a ten-percent contingency for $33,520, for a total contract amount not to exceed $368,720. The applicant is responsible for all costs associated with the preparation of the EIR, including the additional costs of this proposed amendment. The applicant will deposit the additional funds into a trust account to be maintained by the City. Any unspent funds would be returned to the applicant following completion of the project review and public hearing process.
ALTERNATIVE ACTION
Other action as determined by the City Council.
6 Packet Pg. 273
FISCAL IMPACT
There will be no fiscal impact. All costs associated with the preparation of the Environmental Impact Report (EIR) for the Wiley Canyon Development Project will be the responsibility of the applicant.
ATTACHMENTS
Aerial Map
Dudek Change Order 1
6 Packet Pg. 274
Project Site
Wiley Canyon Mixed-Use Project
Assessor’s Parcel Numbers 2825-012-007, 2825-007-010, 2825-012-011, 2825-012-901, and 2825-012-902 N
6.a
Packet Pg. 275
Attachment: Aerial Map (Wiley Canyon Development Project EIR Contract Amendment)
JUNE 2024
1 June
28 , 2024
Erika Iverson
Senior Planner
City of Santa Clarita
Planning Division
23920 Valencia Boulevard, Suite 140
Santa Clarita, CA 91355
Subject:
Change Order
Request
No.
1 t
he
Wiley Canyon Project
EI
R
Dear
Erika
Iverson
:
This letter provides Dudek’s
requested
Change Order Number 1 (CO
-
1) to reflect additional effort required to
support the Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act (CEQA) for the proposed Wiley Canyon
Project
(Project). This CO
-
1 requests
an augment to Task 5 related to the Responses to
Comments effort required for the Final EIR.
In the proposal prepared for the Project,
dated
September 2021, for purposes of cost estimation Dudek assumed response to no more than 100 individual public comments on the Draft EIR (noting that a single comment letter could contain multiple comments). While Dudek assumed that comments received relate d to technical items
prepared by other team members would be addressed by the appropriate individual and provided to Dudek for final incorporation into the Draft Final EIR document, the number of comment letters and individual comments far exceeds the orig
inal proposal assumption. At the close of the public review period, Dudek received a total of 60 letters, broken down as follows: 10 agency comment letters ,
4 organization comment letters
,
46 individual
comment letters
.
Several of these comment letters are in excess of 30 pages containing as many as 97 comments.
In total, 503 comments were bracketed
, organized, and
either
assigned
to technical team mem
bers or are b
eing
responded to by Dudek
.
The attached CO
-
1 and Cost Estimate are provided for your
consideration.
As shown in CO
-
1, Dudek u
tilized funds
for future
sub
tasks
within Task 5
to review, organize, and
prepare draft responses to
the
comments received. As
such, we are requesting
CO
-
1 to
complete
responses to comments,
replenish
future
budgeted tasks,
and prepare
the
Draft Final EIR, Final EIR, and certification support documents.
Please note
, Dudek has adjusted billing rates
since the original proposal in 2021
; t
his
Change Order
request utilizes
the
current 2024
billing
rates for
Project
team members.
If you have any questions or comments, please contact
Ms.
Cobleigh
by phone
at
626
.
204
.
9829
or
by
email at
[email protected]
.
Thank you.
Sincerely,
__________________________________
__
Nicole Cobleigh
Senior Project Manager
6.b
Packet Pg. 276
Attachment: Dudek Change Order 1 (Wiley Canyon Development Project EIR Contract Amendment) TO:
ERIKA IVERSON
SUBJECT:
CHANGE ORDER
REQUEST
NO.
1 T
HE
WILEY CANYON PROJECT
EI
R
JUNE 2024
2 Scope of Work
TASK
5 FINAL EIR (AUGMENT)
Subt
ask
5.1 Draft Final EIR
(Augment)
This augment requests additional funds due to the exceedance in the assumed number of comments received. The September 2021 proposal assumed no more than 100 individual public comments on the Draft EIR (noting that a single comment letter could contain mul
tiple comments). At the close of the public review period, Dudek received a total of 60 letters, broken down as follows: 10 agency comment letters, 4 organization comment letters, 46 individual comment letters. Several of these comment letters are in exces s of 30 pages containing more than 90
comments. A total of 503 comments were bracketed, organized, and
either
assigned
or are being responded to by
Dudek
. As such, t
his
task
augments
the budget for
the preparation of a “Responses to Comments Received”
document to address environmental issues pertinent to the analysis presented in the EIR.
Subtask 5.1 includes the
review and
organization of comment letters, coordination with applicant subconsultants, collaboration with City staff
, and
preparing responses to all comments received
.
A
ll
comments
received
were
numbered to indicate comment letter and comment number, and the responses to those comments are
similarly
numbered to allow easy correlation.
Dudek
is preparing
draft responses to comments received.
Dudek has
also
identified responses with
support from the applicant’s subconsultants. Upon receipt of applicant responses, Dudek will revise the Responses to Comments with individual responses. In the event that multiple comments on the same topic(s) are identified, Dudek
will
use Topical Responses as a way to save time and budget, and where appropriate, direct individual commenters to the appropriate Topical Response(s). Given the number
of
comments
received,
Dudek ha
s allocated additional budget for our Publications Department to compile and format into the Final EIR.
Additionally,
d
ue to changes to the
Project D
escription
, Dudek will prepare a “
Changes
to the Draft EIR” chapter
that will identify instances where revisions to the Draft EIR are appropriate. In this chapter, deleted text will be indicated by strikeout and inserted text by
bold
underline.
Subt
ask
5 .1 Assumptions
This
task
assumes
only minimal revisions to the document and no
additional
changes to the
P
roject
D
escription, analysis, or mitigation measures set forth in the EIR are necessary as a result of the additional information provided by the City.
Technical team members will prepare draft
Responses to Commen
ts for inclusion in the overall
Response to Comment effort
Subt
ask
5 .1
Deliverables
One (1) electronic copy of the Draft Final EIR for City staff review
Subt
ask
5. 2
Final
EIR
(Augment)
Upon receipt of a consolidated set of review
comments from City staff
on the draft Responses to Comments
, the
City Attorney and project team members on the Draft Final
EIR
, Dudek will prepare the Final EIR for certification.
Dudek will assemble text changes to the Final EIR as appropriate. This proposal assumes two (2) screencheck reviews of responses to comments by City staff prior to completion of the Final EIR. Dudek will assemble the Final EIR and provide the necessary cop
ies and digital files to City staff to take the EIR through the hearing process to certification. The
Mitigation Monitoring and Reporting Program
(MMRP) will also be finalized for inclusion in the
6.b
Packet Pg. 277
Attachment: Dudek Change Order 1 (Wiley Canyon Development Project EIR Contract Amendment) TO:
ERIKA IVERSON
SUBJECT:
CHANGE ORDER
REQUEST
NO.
1 T
HE
WILEY CANYON PROJECT
EI
R
JUNE 2024
3 Final EIR. Dudek assumes that there will be no more than two (2) rounds of administrative review for the Final EIR before finalizing the documents for certification. The Final EIR, responses to comments, and the MMRP will be submitted to the City for distr
ibution.
Subtask 5.2 Assumptions
Two (2) screencheck reviews of
R
esponses to
C
omments by City staff prior to completion of the
Final EIR
Consolidated set of review comments from City staff, the City Attorney and P
roject team members
This scope and cost
do
not
include
R
esponses to
C
omments
submitted
before or
at public hearings.
Subtask 5.2
Deliverables
Fifteen (15) hard copies of the Final EIR
for public review; and
One (1) reproducible master of the Final EIR
Subtask 5.3
Certification Support
Also included as part of the Final EIR package will be the Findings of Fact and a Statement of Overriding Considerations. Dudek will prepare draft CEQA Findings of Fact for submittal to the City, utilizing a recently adopted example of the findings as used
by the City.
If applicable, Dudek will also prepare a Statement of Overriding Considerations. A Statement of Overriding Considerations may be required if significant unmitigated impacts are identified as part of the CEQA review process.
The Statement of Overriding Cons
iderations will be prepared if the City finds that the benefits of the proposed project outweigh unavoidable adverse environmental effects. The statement will set forth the specific overriding social, economic, legal, technical, or other beneficial aspects
of the project supporting the City’s decision; this will be based on substantial evidence in the Final EIR or elsewhere in the record.
Dudek will also prepare the Findings of Fact for review and comment and will submit them to the City prior to EIR certification. The final set of findings and Statement of Overriding Considerations will be completed based on revisions by City staff and leg
al counsel.
Upon certification of the EIR by the City Council, Dudek will assist the City in preparing and filing a Notice of Determination (NOD) with both the County Clerk and State Clearinghouse as well as include the payment of California Department of Fish and Wil
dlife filing fees.
Subtask 5.3 Assumptions
Atte
nda
nce at
up to
two
additional
(2
)
Project
hearings
by up to two
Dudek team members
One (1) round of review for the Findings of Fact and a Statement of Overriding Considerations
One (1) round of review for
the
NOD
Dudek will post the NOD with
the
State Clearinghouse and file with the Los Angeles County Clerk (including payment of filing fees)
Subtask 5.3
Deliverables
One (1) electronic copy of the Findings of Fact
One (1) electric copy of the
Statement of Overriding Considerations
6.b
Packet Pg. 278
Attachment: Dudek Change Order 1 (Wiley Canyon Development Project EIR Contract Amendment) TO:
ERIKA IVERSON
SUBJECT:
CHANGE ORDER
REQUEST
NO.
1 T
HE
WILEY CANYON PROJECT
EI
R
JUNE 2024
4 Cost Estimate
As shown in Attachment A, Cost Estimate, this Change Order request provides an itemized cost by staff and hourly rate for the amount o
f $
9 5
,
24 0.
All tasks will continue to be billed on a time
-
and
-
materials basis in accordance with
the terms and conditions of our primary Agreement
, dated December 16, 2021
. This Change Order is provided to
document the City’s written authorization to amend our existing Agreement. All other terms and conditions of the original Agreement between the City and Dudek remain in effect. Upon receipt of signed authorization from th e City,
work can continue in accordance with the requested CO
-
1 .
6.b
Packet Pg. 279
Attachment: Dudek Change Order 1 (Wiley Canyon Development Project EIR Contract Amendment) TO:
ERIKA IVERSON
SUBJECT:
CHANGE ORDER
REQUEST
NO.
1 T
HE
WILEY CANYON PROJECT
EI
R
Attachment A
Original
CO-1
Original
CO-1
Original
CO-1
$230.00
$235.00
$100.00
$145.00
$95.00
$130.00
Task 5
5.1 Draft Final EIR
32 64
64 256
96 320
$13,760
$52,160
$13,760
$52,160
5.2 Final EIR
24 48
52 104
24 96
100
248
$13,000
$38,840
$300
$1,200
$13,300
$40,040
5.3 Certification Support
8 8
40 8
48 16
$5,840
$3,040
$3,800
$9,640
$3,040
64 120
156
368
24 96
244
584
$32,600
$94,040
$4,100
$1,200
$36,700
$95,240
Dudek Labor Hours and Rates
TOTALS
OTHER DIRECT
COSTS
Original
CO-1
Original
CO-1
TOTAL FEE
Final EIR
Team Member:
Original
CO-1
TOTAL DUDEK
HOURS
Original
CO-1
DUDEK LABOR
COSTS
Analyst V
Brandon Whalen-
Castellanos
Publications Specialist lV
Chelsea Ringenback
Project Team Role:
Billable Rate:
Senior Specialist IV
Nicole Cobleigh
6.b
Packet Pg. 280
Attachment: Dudek Change Order 1 (Wiley Canyon Development Project EIR Contract Amendment)
Agenda Item: 7
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: August 27, 2024
SUBJECT: TOURISM MARKETING DISTRICT ADVERTISING CONTRACT DEPARTMENT: Economic Development
PRESENTER: Evan Thomason
RECOMMENDED ACTION
City Council:
1. Authorize the City Manager or designee to award a one-year contract to Lundmark Advertising + Design to provide marketing and advertising services for the Tourism Marketing District for an annual amount not to exceed $357,000.
2. Authorize the City Manager or designee to execute up to four additional, one-year renewal options beginning in year two, not to exceed the annual contract amount plus an adjustment consistent with the appropriate Consumer Price Index, upon request of the contractor, and contingent upon the appropriation of funds by the City Council in the annual budget for such Fiscal Year.
3. Authorize the City Manager or designee to execute all contracts and associated documents, or modify the award in the event that issues of impossibility of performance arise, and execute all documents subject to City Attorney approval.
BACKGROUND
The City of Santa Clarita (City) Tourism Marketing District (TMD) funds various services and activities to promote the City as a tourist destination. These include developing marketing strategies to increase visitor attraction, advertising and public relations programs focused on business and leisure travel to Santa Clarita, attending conferences and conventions to promote the City to event planners, and securing other activities and events that bring business and tourism to Santa Clarita. Tourism Marketing District funds are generated from a two percent assessment of hotel room stays in the nine local hotels that are part of the TMD.
7 Packet Pg. 281
The City is seeking a full-service advertising agency to assist with the overall brand strategy and various marketing needs of the TMD on an annual basis. In addition to marketing to leisure travelers, focus is placed on attracting meeting planners and sporting event rights holders to produce events in Santa Clarita that have a positive economic impact on local businesses. The anticipated advertising campaign would run from fall 2024 to spring 2025.
Aside from the advertising component in the scope of work, other services provided by the agency include search engine optimization (SEO), graphic arts, and focused promotion and publicity outside the annual advertising campaign.
The City’s Purchasing division, in collaboration with the Economic Development division, issued a Request for Proposal (RFP) for a full-service advertising agency to assist with the City’s overall brand strategy and various marketing needs. The RFP was publicly advertised from May 7 to June 4, 2024, on BidNet, the City’s e-procurement platform. The RFP was downloaded by 85 vendors, and four proposals were received.
An evaluation panel comprised of staff from the Economic Development division reviewed and scored each of the proposals using the following criteria:
• Experience in developing and managing comprehensive multimedia advertising strategies for Destination Marketing Organizations - tourism programs • Demonstrated capability of developing professional creative content that differentiates a Destination Marketing Organization from its competitors • Experience in conducting research for Destination Marketing Organizations • Cost of services provided
• References
The following shows the results of the rankings by the evaluation panel:
Reporting of the results of the digital advertising campaign are to be collected on a regular basis and outcomes are to be measured against travel industry standards, including, but not limited to, overall impressions, click-through-rate (CTR), number of clicks, and engagement and lead generation. Results would also be measured against previous advertising campaigns and hotel measurables such as occupancy percentage and average daily rates (ADR).
Staff recommends the City Council award the contract to Lundmark Advertising + Design (Lundmark), which achieved the highest overall score. Lundmark was awarded the contract for the previous City tourism advertising campaign with positive results and work performed that met the City’s standards and performance expectations.
Rank Company Score (100 possible)
1 Lundmark Advertising + Design 97.67
2 Hylink Group 87.67
3 Ntooitive Digital 57.67
4 True Digital Marketing, Inc. 7.33
7 Packet Pg. 282
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
Upon approval of the recommended actions, adequate funds will be available in the amount of $294,000 in Expenditure Account 3603504-516104 (TMD/Advertising); $28,000 in Expenditure Account 3603504-516102 (TMD/Professional Services); $20,000 in Expenditure Account 3603504-516105 (TMD/Promotion & Publicity); and $15,000 in Expenditure Account 1003601- 516105 (Art Programs/Promotion & Publicity) to support the award of this contract.
ATTACHMENTS
Lundmark Proposal
Lundmark Cost File
7 Packet Pg. 283
JUNE 4, 2024
PROPOSAL #ED-23-24-32
PART I - RESPONSE FILE
ADVERTISING CAMPAIGN
LUNDMARKADVERTISING.COM | 2345 GRAND BLVD., SUITE 200, KANSAS CITY , MISSOURI 64108 | 816.842.5236
7.a
Packet Pg. 284
Attachment: Lundmark Proposal (TMD Advertising Contract Award)
COVER LETTER
Russell Sypowicz
Partner | Lundmark Advertising + Design
2345 Grand Blvd., Suite 200
Kansas City, MO 64108
816-842-5236 | [email protected]
RFP Evaluation T eam,
Lundmark is thrilled to respond to Proposal #ED-23-24-32. We are a full-service marketing and design agency that has been creating successful solutions since 1947. We take a hands-on approach to our projects, view ourselves as an extension of your team, and pride ourselves on being accountable on all timelines, executions, and budgets.
Regardless of industry, client, or objective – we deliver results. We take a comprehensive approach toward understanding your needs and collaborate to implement cost-efficient strategies that produce transparent results.
Our staff has a passion for and experience with the travel and tourism industry. Based on our experience working with destination marketing organizations, including Visit Santa Clarita for the past 8 years, we feel we are uniquely positioned to assist with your objectives.
In summary, we feel we are the best fit for this project for the following reasons:
• Experience – Working collaboratively with Tourism office staff, Visit Santa Clarita’s advertising efforts have generated 8 years of growth across key performance indicators. • Team – Our team stays abreast of changes within the tourism industry as well as new media opportunities to ensure we target leisure and business traveler efficiently. • Structure - The unique structure of our firm guarantees that the experience of your account team will include all four of our agency principals.
• Size - We’re big enough to bring the resources required to successfully manage your account, but small enough to ensure that you get the attention you deserve. • Approach - You will find our comprehensive, transparent approach outlined in our response.
We have elaborated on a number of these sections in the coming pages of this document, but please do not hesitate to reach out with any questions regarding our proposal. We greatly appreciate being considered for this opportunity.
2 City of Santa Clarita
23920 Valencia Blvd.
Santa Clarita, CA 91355
June 4, 2024
7.a
Packet Pg. 285
Attachment: Lundmark Proposal (TMD Advertising Contract Award)
T ABLE OF
CONTENTS
Cover Letter 2 Table of Contents 3 Introduction 4 Research, Strategy, & Campaign Management 8 Media 10 Creative Development and References 14 Assigned Personnel 24 Sub-Consultants 27 Contractor Capability & References 28 Additional Data 33 3 7.a
Packet Pg. 286
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 4 With over 75 years of experience building
brands, we believe in pushing the boundaries,
harnessing creativity, and exploring innovative
solutions to elevate our clients into becoming
authentically different. We differentiate
ourselves through these three pillars:
• Accountable on all timelines, execution and budgets
• Flexible to meet deadlines and projects on tight schedules
ACCOUNT ABILITY
COLLABORA TION
• Hands-on approach, extension of your team
• Multiple client relationships spanning 10+ years
TRANSPARENCY
• Cost-effective and competitive solutions
• Void of agency bureaucracy and red tape
AUTHENTICALL Y
DIFFERENT
INTRODUCTION
7.a
Packet Pg. 287
Attachment: Lundmark Proposal (TMD Advertising Contract Award)
INTRODUCTION
5 FULL-SERVICE SOLUTIONS
As a full-service marketing agency, we provide integrated marketing solutions that drive results. Since day one, our vision has been to develop great work, build lasting relationships and deliver strong results. We’re relentlessly independent, void of big egos and layers of bureaucracy. We believe in fostering collaborative relationships with our clients and making their lives easier. 360o SOLUTIONS
Brand Positioning
Marketing Strategy
Media Planning & Buying
Campaign Management
Experiential Marketing
Product Launch
Retail Sell-In
MARKETING
Brand Identity
Packaging
Merchandising
Sales Support
Photography
Video Production
Copywriting
CREA TIVE
Web Design
Web Development
SEO/SEM
Digital Advertising
Asset Management
Email Marketing
Social Media
DIGIT AL
7.a
Packet Pg. 288
Attachment: Lundmark Proposal (TMD Advertising Contract Award)
INTRODUCTION
CAPABILITIES
6 As a full-service firm, our expertise extends to the following areas pertinent to this project:
CREA TIVE SERVICES
Our full-service creative capabilities provide our clients with everything they need to execute their integrated marketing plans. Whether it’s design, copy writing, photography or video, our process focuses on making an emotional connection with the audience and pays special attention to brand consistency across all channels.
MEDIA PLANNING & BUYING
Our understanding and experience with communication channels that include digital, social, print, television, radio, and out-of-home allows us to provide comprehensive media plans for our clients.
BRAND DEVELOPMENT
For companies large and small, startup to well-established, our tested branding process lays the foundation for your brand to shine. This includes brand positioning, brand identity and refinement, brand collateral, and more.
SOCIAL MEDIA
We manage the social media presence for brands, create social toolkits to engage audiences, and execute targeted social media campaigns to broaden awareness and achieve key objectives. Through collaboration with your team, we develop goals for each social platform and can offer guidance or take full ownership of channel strategy, voice/tone, frequency, and content.
WEBSITE DESIGN & DEVELOPMENT
Our website design and development approach is one of collaboration. More than just producing a site that is aesthetically pleasing to the eye, we consider client objectives including functionality, user experience, ease of updates, and maintenance.
RESEARCH & MARKETING ANAL YSIS
Lundmark has experience conducting research that influences strategic marketing decisions. Our expertise includes analyzing existing analytics/data to determine key learnings, managing focus groups and online surveys, and hosting public meetings to gather valuable input from community stakeholders.
STRA TEGIC MARKETING
We frequently work with clients to review their brand’s perception and position within the marketplace and develop a comprehensive, strategic marketing plan based on data, with clear and measurable objectives.
7.a
Packet Pg. 289
Attachment: Lundmark Proposal (TMD Advertising Contract Award)
INTRODUCTION
7 CLIENT SERVICE PHILOSOPHY
PARTNERSHIP
We view our clients as partners – caring deeply about not just the success of individual projects but the success of the organization as a whole. It’s why we’ve had effective relationships with many clients for more than a decade. These include publicly traded companies, start-ups, educational institutions, not-for- profit organizations, and governmental agencies.
COMMUNICA TION
The start of our client-focused approach begins with communication. By having the leadership team of Lundmark as your direct point of contact, you can ensure that an experienced individual is managing your account. We pride ourselves on being extremely responsive to inbound requests, and our clients laud our proactive approach to project management.
FLEXIBILITY
Our clients love our flexibility. They can attest that we always meet our deadlines while providing quality work. As an independently owned firm, we are void of the traditional agency bureaucracy and can be more nimble on our feet. By having a full creative team that is up-to-speed on your brand, we are not dependent on just one team member to execute projects. Our new client onboarding process involves getting our entire team up-to-speed on client goals, objectives, growth strategy, and key initiatives on the horizon. By having a diverse team at your fingertips, we can pull in the staff required for any type of project and hit the ground running.
ACCOUNT ABILITY
We hold our team to the highest standard of accountability. We have weekly internal meetings to ensure projects are on track with the timeline specified for each project. It’s not enough that we deliver results.
We believe we must do so in a way that is on time, transparent, and fair to the budget. Team members are personally accountable for their involvement in each project, and our staff thrives on delivering results.
7.a
Packet Pg. 290
Attachment: Lundmark Proposal (TMD Advertising Contract Award)
RESEARCH, STRA TEGY , &
CAMPAIGN MANAGEMENT
RESEARCH
8 Lundmark conducts research that influences strategic marketing decisions. Our expertise includes analyzing existing analytics/data to determine key learnings, managing focus groups and online surveys, and hosting public meetings to gather valuable input from community stakeholders.
When planning recent Visit Santa Clarita campaigns, our research included analysis of the following types of data:
• Hotel feeder market data – zip codes of frequent travelers. • Tourism reports – CBRE Trends reports on local occupancy, ADR and REVPAR. • Google Analytics – geography, interests and behavior details of VisitSantaClarita.com users. • Facebook - audience insights related to social media followers. • Sweepstakes entries – interest data collected from previous online sweepstakes. • Experian Mosaic USA – a subscription data service that divides the US population into 19 Groups and 71 more detailed types. It paints a unique picture of US consumers based on their demographic characteristics, lifestyles and behavior.
• Pixel data – pixels provided by media partners and placed on VisitSantaClarita.com have created consumer personas based on the visitors of the website.
This data/analysis would serve as a baseline for all media plans moving forward. As pixel technology improves, and data sharing regulations change, we would continuously look to gain access to insights that would help improve our targeting strategy. Finally, as this year’s campaign looks to target meeting and event planners as well as leisure travelers, conversations with conference sales managers at various hotel properties may be necessary to fully understand the offerings, current clientele, and appropriate target audience.
Lundmark has extensive experience managing tourism advertising campaigns from concept to execution.
We have outlined our approach and experience in the areas of research, strategy, campaign management, and measurement and evaluation below.
7.a
Packet Pg. 291
Attachment: Lundmark Proposal (TMD Advertising Contract Award)
RESEARCH, STRA TEGY , &
CAMPAIGN MANAGEMENT
9 STRA TEGY
Once our research and analysis is completed and campaign objectives are clearly understood, we would proceed to developing the strategy for the media plan. Importantly, we have eight years of past learnings that showed us what worked well, as well as areas that can be improved upon.
Lundmark would engage media partners that have experience in travel and tourism advertising across a variety of mediums. In addition to radio, television, outdoor and print advertising partners, we’ve worked with national media vendors that can target any audience we define:
• Digilant - using both deterministic and probabilistic matching, Digilant creates a Cross-Device ID to target users on multiple screens with near-perfect precision.
• Illumin - lllumin brings media planning and buying together in an interactive and intuitive interface. We have data from multiple Visit Santa Clarita campaigns to leverage in the future. • Audacy - through their suite of comprehensive digital offerings, Audacy targets users at home, at work, and on-the go.
• YouTube - YouTube is growing at a double-digit pace as linear TV continues to decline. Our past YouTube campaigns for Visit Santa Clarita have led to increased brand awareness and website traffic. • AdTheorent - AdTheorent uses machine learning and data science to deliver real-world value for advertisers. Their rich media units have historically driven tremendous engagement for Visit Santa Clarita.
CAMPAIGN MANAGEMENT
Lundmark would manage all facets of paid advertising from start to finish, which includes providing reporting to the Tourism division for each media channel.
Historically we have provided bi-weekly campaign updates, as well as presentation decks for TMD meetings as needed.
Each goal or objective outlined in the media plan will have associated metrics to ensure measurable success is identifiable. Upon analysis of initial conversions, we would recommend and implement changes with all media partners. Additionally, any campaign will be extensively evaluated during and upon conclusion. Key findings will be shared and discussed and recommendations will be made for future campaigns. Lundmark will provide a comprehensive campaign recap that can be used in presentations to city staff and tourism partners.
7.a
Packet Pg. 292
Attachment: Lundmark Proposal (TMD Advertising Contract Award) MEDIA
10 MEDIA PLANNING AND BUYING
Lundmark has extensive experience planning and purchasing both traditional and non-traditional forms of media for our clients. We partner with a wide range of media companies spanning digital, outdoor, print, and broadcast to meet objectives and maximize results. These partnerships provide us access to premium inventory and preferred rates, as well as planning tools such as Kantar, Nielsen, MRI, Scarborough, and Experian Mosaic. We utilize these tools, and any first-party data provided, to identify personas, create custom audience segments and inform creative messaging. We’re data-driven – everything we do is rooted in what the data is telling us – from consumer insight data to campaign performance data. Here are our key travel data partners we might leverage for your campaign.
7.a
Packet Pg. 293
Attachment: Lundmark Proposal (TMD Advertising Contract Award) MEDIA
11 Media partners would be engaged to assist in the planning and execution of any campaign. We have experience working with a variety of ad tech media partners that specialize in destination marketing, including:
These partners have extensive experience executing across all channels for clients within the Travel and Tourism sector, including:
7.a
Packet Pg. 294
Attachment: Lundmark Proposal (TMD Advertising Contract Award) MEDIA
12 DIGIT AL MEDIA PLANNING CAPABILITIES
Digital media is ever evolving. Our team stays on top of the latest technology available to help our clients connect with their target audience.
DISPLAY MOBILE VIDEO EMAIL SOCIAL RADIO
BEHAVIORAL CONTEXTUAL GEOGRAPHICAL CROSS-DEVICE
SEARCH
T ARGETING METHODOLOGY
Digital media is easy to track and adjust based on performance. The benefits of being able to target your consumer via behavioral and contextual targeting, site and search re-targeting, and geo-targeting are extremely valuable, and offer strong ROI.
7.a
Packet Pg. 295
Attachment: Lundmark Proposal (TMD Advertising Contract Award) MEDIA
13 Digital media can target consumers in more efficient ways than ever before. A few of the popular tactics we consider with campaigns for our clients include:
• Location Targeting – targets an audience by geo-fencing an area and using the user’s IP address or device ID. While this tactic can also review past geographic history, we don’t recommend going back more than 3-6 months.
• Recency Re-targeting – we’ve all visited a website and then had an advertisement appear for the brand we recently viewed. Recency re-targeting can take this one step further, by ensuring that your audience isn’t inundated with ads following a web visit. Using a variety of algorithms, we are able to optimize the frequency and best time of day to serve up the ad.
• Behavioral Targeting – this tactic utilizes 3rd party data to identify and target an audience that will be receptive to your campaign. Data analyzed includes online activity, social media behavior, and credit card purchases.
• Contextual Targeting – rather than delivering impressions sitewide, software can review the content of the web page and determine if the messaging aligns with your target audience. • Search Re-targeting – serves display or video ads to audiences searching for relevant keywords on popular search engines. This tactic should not to be confused with traditional search engine marketing (SEM).
• Custom Whitelists – we can recommend a custom whitelist for websites that most closely align with your target audience. While this tactic comes at a premium, we usually suggest including it at the beginning of a campaign to compare performance. On the flipside, we can blacklist sites that do not align with your brand.
• App Ownership – as apps continue to be ingrained into our everyday lives, we can review apps a phone has downloaded and incorporate them as a tactic in your campaign. This can be extremely helpful when attempting to create lookalike audiences.
• Cross Device – the global digital consumer now owns more than 3 connected devices. This makes it all the more difficult to engage with your audience with the right message on the right device. Implementing cross device tactics sets up your advertising for success.
7.a
Packet Pg. 296
Attachment: Lundmark Proposal (TMD Advertising Contract Award) It had been a number of years since Visit Santa Clarita, the destination marketing organization for the Santa Clarita Valley, revisited their brand positioning. Lundmark was engaged to evaluate the current landscape, develop a new identity to differentiate the destination from area competitors, and execute a marketing campaign to showcase the new- and-improved brand.
THE CHALLENGE
14 CREA TIVE DEVELOPMENT &
REFERENCES
CONT ACT REFERENCE:
Evan Thomason
Economic Development Associate
City of Santa Clarita
[email protected]
(661) 255-4347
7.a
Packet Pg. 297
Attachment: Lundmark Proposal (TMD Advertising Contract Award) Finally, we conducted a competitive analysis of nearby destinations and their positioning in the marketplace.
A variety of research was conducted to develop the profile of the current Santa Clarita visitor. Discussions with Santa Clarita staff and tourism partners were held to coincide with online surveys of potential travelers to measure the perceived value of amenities and attractions. Specific resources that were included in our analysis included:
• Google Analytics
• Search engine optimization reports
• Hotel feeder market data
• CBRE occupancy trend reports
• Search terms on the current site
• State and national tourism reports
• Demographic/psychographic clusters that matched current analytics of website visitors and theme park travelers
RESEARCH
15 CREA TIVE DEVELOPMENT &
REFERENCES
7.a
Packet Pg. 298
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 16 CREA TIVE DEVELOPMENT &
REFERENCES
Data collected from our research efforts resulted in a new positioning strategy for Visit Santa Clarita. We noted that many Los Angeles attractions were within thirty miles of Santa Clarita. Given this proximity, travelers could utilize Santa Clarita as a springboard for their entire Los Angeles vacation. Coupled with the value accommodations and family-friendly attractions offered, Santa Clarita would be henceforth be known as the “Gateway to L.A.”
A new brand identity was developed which paid homage to Six Flags Magic Mountain, the highest recalling attraction in the area. A lockup utilizing the “Gateway to L.A.” tagline was included, as were other lockups specific to internal branding efforts. A style guide was developed to ensure the new brand identity was implemented appropriately across staff, tourism partners and external vendors.
The new brand was launched through an integrated, comprehensive digital marketing campaign that targeted visitors based on geographic location, demographic preferences and propensity to travel. Creative elements featured the variety of unique attractions that travelers can only find in Santa Clarita.
POSITIONING STRA TEGY
CREA TIVE EXECUTION
Looking for the perfect getaway?
Look no further than Santa Clarita. Easily accessible from I-5 and just minutes from LAX and Hollywood Burbank Airport, Santa Clarita is a great home base for exploring Los Angeles and has all the amenities families look for when planning a vacation.
• Endless opportunities for outdoor recreation adventures • Excitement at Six Flags Magic Mountain and Hurricane Harbor • Family-friendly dining options
• Year-round activities including concerts, seasonal festivals, cultural and sporting events
Plan the Perfect Getaway Now!
View as a Web Page
VISIT
GATEWAY TO L.A.
find
SANTA
CLARITA!
in
PAID SOCIAL MEDIA ADS
LEAD ACQUISITION
DIGIT AL ADVERTISING
EMAIL MARKETING
7.a
Packet Pg. 299
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 17 CREA TIVE DEVELOPMENT &
REFERENCES
DIGIT AL ADVERTISING
Feedback received from the destination marketing organization and their clients was overwhelmingly positive.
More than 4,500 leads were captured in just over six weeks, and corresponding email addresses were added to the client’s database for future marketing efforts. Finally, page ‘likes’ on Facebook, where the contest was hosted, jumped 242% in one month.
RESULTS
7.a
Packet Pg. 300
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 18 CREA TIVE DEVELOPMENT &
REFERENCES
CONT ACT REFERENCE:
Anne Deuschle
Marketing Director
Crown Center
[email protected]
(816) 274-5916
As Kansas City continues to grow as a place to live and be entertained, Crown Center was looking to drive traffic amongst their target audience of families and downtown dwellers. A refreshed brand and comprehensive analysis of current event marketing was required to meet the goal of driving visitors to Crown Center’s shops, restaurants, attractions, and events.
HALLMARK
VISITORS CENTER
Free interactive exhibits year-round. Plus, the
Showplace is home to Santa during the
Christmas season. For exhibit information,
call 816-274-8411 or visit CrownCenter.com.
Discover how a teenager from Nebraska
tucked two shoeboxes of postcards under his
arms and set out to create an iconic company in
Kansas City. Open Monday–Saturday. Free admission.
Call 816-274-3613 or visit HallmarkVisitorsCenter.com
.
435
670
435
435
435
470
49 35
29 70
70 35
DOWNTOWN
to St. Joseph & Omaha
KCI Airport
to Topeka
to Des Moines
to St. Louis
to Olathe
& Wichita to Joplin
71 71
Crown Center is located in the heart of Kansas City at
2450 Grand Blvd., Kansas City, MO 64108 | 816-274-8444
HOW TO GET TO
CROWN CENTER
FEA TURED A TTRACTIONS
Skate on Kansas City’s downtown public outdoor
rink – open daily, November through mid-March.
Group rates and season passes available.
For information and hours, call 816-274-8411
.
A Kansas City favorite, SEA LIFE is swimming
with exotic marine life. See fish of all sizes
including suarks, rays, and a sea turtle.
For more information, call 816-274-8411
or visit VisitSeaLife.com/Kansas-City.
For kids ages 3–10, it’s like jumping into the
biggest LEGO
® box ever! With more than 2 million LEGO
® bricks, an interactive laser ride and iconic Kansas City LEGO ®
landmarks, LEGOLAND
® is the ultimate family entertainment. For information, call 816-471-4386 or visit KansasCity.
LEGOLANDDiscoveryCenter.com
.
Kaleidoscope is a free
hands-on art studio,
where children and
their families
make their
own wonderful
creations. Sponsored by
Hallmark. For
session times,
call 816-274-8300 or
visit HallmarkKaleidoscope.com
.
FROM THE NORTH ON I-35
Follow I-35 South to 71 Hwy
South (exit 3). Continue on 71 Hwy South (exit 2M). Exit at 22nd St. and turn right (west). Turn left (south) on Grand Blvd. and continue to Crown Center at Pershing Rd.
FROM THE NORTH ON I-29
Take I-29 South to US-169 South (exit 2B). US-169 South becomes Broadway. Follow Broadway to Pershing Rd. Turn left (east) on Pershing Rd. and continue to Crown Center at Grand Blvd.
FROM THE SOUTH ON I-35
Exit at W. Pennway St. (exit 1C). Turn right (east) on W. Pennway. Turn left (north) on Southwest Blvd. Turn right (south) on Broadway. Turn left (east) at Pershing Rd. and continue to Crown Center at Grand Blvd.
FROM THE SOUTH ON 71 HIGHWAY AND I-49
Exit
at 22nd St. and turn left (west). Turn left (south) on Grand Blvd. and follow to Crown Center at Pershing Rd.
FROM THE EAST ON I-70
Exit at Locust St./Truman Rd. (exit 2Q). Turn left (south) on Grand
Blvd. and follow to Crown Center at Pershing Rd.
FROM THE WEST ON I-70
Take I-70 East to I-670. Exit I-670 on to I-35 South (exit 2T). Exit I-35 South at 20th St. (exit 1D). Turn left (east) on 20th St. Turn south on Grand Blvd. and continue to Crown Center at Pershing Rd.
EASY ACCESSIBILITY
Van-accessible handicapped parking is available on Grand Blvd. near the main entrance, and the parking garage includes handicapped parking close by. Ramps throughout Crown Center allow access to all shops, Hallmark Visitors Center and Kaleidoscope. For specific information, call 816-274-8444 during
shopping hours.
® 2020 Crown Center: (091920K)
CrownCenter.com | #CrownCenter
LEGOLAND DISCOVEY CENTER
KALEIDOSCOPE
SEA LIFE KANSAS CITY
AQUARIUM
THEA TRES
CROWN CENTER ICE TERRACE
CROWN CENTER SHOWPLACE
MTH THEATER Kansas City’s own professional theater company specializes in musical theater productions. MTH, with its large casts and live music, has become a local theater
favorite for its intimate and engaging concert-style
productions of book musicals and cabaret shows.
For ticket information,
call 816-221-6987 or visit MTHKC.com.
THE COTERIE THEATRE
Recognized nationally,
The Coterie is a
professional
not-for-profit
theatre that
offers families
and young adults
unique theatre
experiences that
last a lifetime. For
ticket information,
call 816-474-6552 or visit TheCoterie.org.
QUIXOTIC THEATER
SENSATIA, cirque cabaret fuses film, live music,
awe-inspiring acrobatics, projection mapping,
delicious desserts and more. For ticket information,
call 816-221-6987 or visit SensatiaKC.com.
EVENTS
A T CROWN
CENTER
At Crown Center, you're in the heart of
Kansas City's entertainment destination.
From our local shopping and dining
to exciting attractions and events,
explore what makes us
uniquely Kansas City.
816-27 4-8444 | 2450 Grand Boulevard, Kansas City, MO 64108 CrownCenter.com/Events | #CrownCenter
THE CHALLENGE
7.a
Packet Pg. 301
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 19 CREA TIVE DEVELOPMENT &
REFERENCES
Lundmark began by researching Crown Center and their competitors in hopes of distinguishing the entertainment district for maximum competitive advantage. Intercept surveys were analyzed to determine patron’s reasons for visiting and perceptions of shopping, dining, and entertainment options. Additional research was conducted to create a consumer persona for each profile and determine the most beneficial way to reach each group.
RESEARCH
7.a
Packet Pg. 302
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 20 CREA TIVE DEVELOPMENT &
REFERENCES
Lundmark incorporated Crown Center’s history, variety and quality into a strategic marketing plan that informed, persuaded and reminded the target audience of the uniqueness of Crown Center and its events.
The research efforts resulted in the brand campaign “Uniquely Kansas City, Always Crown Center.” A new positioning statement was developed to influence the creative messaging and ensure it resonated with key audiences.
Positive feedback on the new brand was received from the client, merchants, and attractions at Crown Center. Each form of media executed was tied back to measurable performance indicators. Quality website traffic increased and foot traffic was recorded as higher than the previous year for each event and exhibit.
DIGIT AL ADS
EMAIL BLAST
PRINT ADS
C
M
Y
CM
MY
CY
CMY
K
CC_VisitKC_PrintAd_8.125x10.75.pdf 1 11/26/19 1:49 PM Speaking to its rich history, vibrant present, and exciting future, the new brand campaign highlights Crown Center as a treasured part of Kansas City. The campaign uses illustrations to demonstrate the wide variety of restaurants, shops, and attractions available at Crown Center. As if following a delightful maze, each image leads to another, featuring endless opportunities for fun. The campaign was executed across out-of-home, digital and print ads, radio, and paid social media.
POSITIONING STRA TEGY
CREA TIVE EXECUTION
RESULTS
7.a
Packet Pg. 303
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 21 CREA TIVE DEVELOPMENT &
REFERENCES
The City of Santa Clarita provides vital arts programming including artist receptions and exhibitions, education/ community events, and art-specific events, but lacked a formal marketing strategy to promote these programs. Lundmark was enlisted to better understand the target audience, develop a marketing strategy, and execute a campaign that drives awareness of SantaClaritaArts.com as a repository of information for local art opportunities, events, and culture.
THE CHALLENGE
CONT ACT REFERENCE:
Katherine Nestved
Arts Coordinator
City of Santa Clarita
[email protected]
(661) 250-3777
7.a
Packet Pg. 304
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 22 CREA TIVE DEVELOPMENT &
REFERENCES
Lundmark conducted an Audience Analysis and Media Audit, which examined relevant data associated with those interested in the arts in Santa Clarita and the channels available to communicate with this audience.
First party data from City owned or operated properties including websites, social media accounts, and past surveys were analyzed for key findings. Additional conversations/ surveys were executed amongst members of the Arts Commission, staff from various City departments, and Santa Clarita based arts organizations. Finally, a stakeholder survey was sent to twenty (20) arts organizations based in the Santa Clarita Valley.
RESEARCH
Tracking pixels were placed on SantaClaritaArts.com with the goal of creating a more robust consumer profile. Similar to analyzing index data from a survey, this pixel data illustrates the consumer personas that are more likely to engage with the website being analyzed.
7.a
Packet Pg. 305
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 23 CREA TIVE DEVELOPMENT &
REFERENCES
The summary of our findings led to a better understanding of the socioeconomic, demographic and behavioral makeup of our target audience. Generally speaking, the audience of the Santa Clarita arts community was local to the Santa Clarita Valley, affluent, and digitally savvy. The media consumption patterns and communication preferences identified in our research were incorporated into a comprehensive marketing plan.
Nearly 6,000 page sessions were generated across the 3-month campaign, more than double the 3-month period preceding campaign launch. Engagement on social media increased via comments, saves, and shares of various ads.
POSITIONING STRA TEGY
RESULTS
Lundmark executed a campaign that targeted residents with engaging ads across multiple digital platforms to increase the awareness of the website. The creative and messaging focused on the areas of public art, artist development, art exhibitions, and calls for artist engagement, positioning SantaClaritaArts.com as the source for arts and culture in Santa Clarita Valley.
CREA TIVE EXECUTION
7.a
Packet Pg. 306
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 24 At Lundmark, our leadership team is actively involved with every client. We’re not a big agency that will pass you off to a junior-level employee. The team below will work intimately on all projects with the City of Santa Clarita. Russell Sypowicz, former employee of the City of Santa Clarita and current project lead with Santa Clarita Tourism and Santa Clarita Arts, will be the lead point of contact for all projects. Professional and educational backgrounds for each of our principals can be found at the LinkedIn links below.
BRANDON MYERS
Brandon has over 20 years of account management experience working for a variety of clients in varying categories. His expertise in the hospitality, travel, and consumer industry has provided key insight to large iconic brands as well as small startups. In his role as President, he oversees client management, marketing strategy and vision for the agency.
However, his primary focus is on building strong, collaborative relationships that build brands and drive growth.
President
RUSSELL SYPOWICZ
Russell has six years of economic development experience with the City of Santa Clarita where he oversaw record growth while managing the film and tourism offices. During his time there, Santa Clarita received a number of accolades, including being named the Most Business Friendly City in Los Angeles. Russell has worked with commercial real estate brokers, community college partners, workforce development centers, chambers of commerce, and economic development corporations on programs that produce results.
Director, Brand Strategy
linkedin.com/in/brandon-myers-0b4b653/
linkedin.com/in/russellsypowicz/
ASSIGNED PERSONNEL
EDUCA TION
UNIVERSITY OF KANSAS
• BS, Journalism, Advertising
SKILLS
Creative Strategy, Project Management, Brand Execution, Relationship Cultivation, Digital Marketing.
Lundmark: 2003 – Present
PROJECT ROLE:
• Project Manager
• Campaign Strategy
EDUCA TION
UNIVERSITY OF SAN FRANCISCO
• MA, Sport Management
GONZAGA UNIVERSITY
• B. Ed, Sport Management
SKILLS
Brand Strategy, Media Planning and Buying, Email Marketing, Website Redesign Process, Sponsorship Integration & Activation, Sport & Event Tourism, Event Planning, Project Management.
Lundmark: 2016 – Present
PROJECT ROLE:
• Project Manager
• Research Strategist
• Media Planner
7.a
Packet Pg. 307
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 25 ASSIGNED PERSONNEL
EDUCA TION
ORAL ROBERTS UNIVERSITY
• BS, Broadcast Design
• Emphasis in Advertising and Public Relations
SKILLS
Graphic Design and Production, Branding and Identity, Creative/Art/Photography Direction, Team Management, Customer Service, Project Management and Status Maintenance, Print Industry Expertise and Consultation, Copywriting.
Lundmark: 1996 – Present
PROJECT ROLE:
• Art Director
• Graphic Designer
• Copywriter
EDUCA TION
NORTHWEST MISSOURI STATE UNIVERSITY
• BFA, Fine Arts, Graphic Design
SKILLS
Graphic Design and Production, Branding and Identity, Photography, Videography, Social Media, Web Development, Copywriting.
Lundmark: 1999 – Present
PROJECT ROLE:
• Web Developer
• Graphic Designer
• Copywriter
KIA HUNT
Kia is the right side of the respective Lundmark brain. She has the unique ability to transform business objectives into relevant brand communications that build equity and relationships with customers. A passionate and gifted brand storyteller, Kia’s medium is limitless, from print to packaging, collateral to corporate identity and everything in between.
Creative Director
linkedin.com/in/kia-hunt-33b8119/
NICK OGDEN
Nick logically processes thoughts into pixels and bytes. On the leading edge of graphic design, he’s responsible for innovation in design and digital at Lundmark. In addition, Nick is also a skilled photographer and retouch artist.
Digital Director
linkedin.com/in/nickogden/
7.a
Packet Pg. 308
Attachment: Lundmark Proposal (TMD Advertising Contract Award) LAURA
Production Manager
Production
Graphic Design
FAITH
Graphic Designer
Production Art
Creative
Project Management
BRANDON
Account Management
Strategy
President
RUSSELL
Director, Brand Strategy
Account Management
Strategy
Media Planning
Creative Direction
Copywriting
Graphic Design
KIA
Creative Director
Web Design/Development
Search Engine Optimization
Digital Media
Video Production
NICK
Digital Director
Account Management
Social Media
Strategy
SARAH
Account Manager
IAN
Web Design/Development
Motion Graphic Design
Photography & Video Production
Senior Graphic Designer
AMY
Production
Graphic Design
Branding
Graphic Designer
COLIN
Production
Graphic Design
Branding
Graphic Designer
Creative Design
Branding
Photography
Graphic Designer
T AYLORLINDSEY
Account Management
Social Media
Search Engine Optimization
Account Coordinator
26 ASSIGNED PERSONNEL
The Lundmark leadership team is supported by a group of multi-talented team members. With 12 full-time team members, the staff featured here will assist in their areas of specialty throughout each project.
7.a
Packet Pg. 309
Attachment: Lundmark Proposal (TMD Advertising Contract Award)
DESIGNATION OF SUBCONTRACTORS/SUBCONSULTANTS
PROPOSAL # ED-23-24-32
Advertising Campaign
City of Santa Clarita, California
Listed below are the names and locations of the places of business of each subcontractor, supplier, and vendor who will perfo rm work or labor or render service in excess of ½ of 1 percent, or $10,000 (whichever is greater) of the prime contractor's total bid. If no Subcontractors will be used fill out the form with NA. Please add additional sheets if needed.
Subcontractor
DIR Registration No. Dollar Value of Work
Location and Place of Business
Bid Schedule Item No’s: Description of Work
License No.
Exp. Date: / / Phone ( )
Subcontractor
DIR Registration No. Dollar Value of Work
Location and Place of Business
Bid Schedule Item No’s:
Description of Work
License No.
Exp. Date: / / Phone ( )
Subcontractor
DIR Registration No. Dollar Value of Work
Location and Place of Business
Bid Schedule Item No’s: Description of Work
License No.
Exp. Date: / / Phone ( )
NOTE: A contractor or subcontractor shall not be qualified to propose on, be listed in a proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless cu rrently registered and qualified to perform public work pursuant to Section 1725.5 of the Labor Code. It is not a violation of this section for an unregistered contractor to submit a proposal that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 of the Labor Code at the time the contract is awarded.
N/A
N/A
N/A
27 SUB-CONSULT ANTS
No sub consultants are anticipated to be used for this project.
7.a
Packet Pg. 310
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 28 In addition to the work supplied in the Creative Development & References section, we wanted to provide additional relevant work for your review.
FUEL RESTAURANT COASTER DESIGNS
Option D - Cross Sell
LUNDMARK | TT013
ROUND 1 - 03/01/22
BACK
FRONT 1
FRONT 2
FRONT 3
CONTRACTOR CAPABILITY &
REFERENCES
GRAB A FRIEND OR A FEW
and experience a whole new way to “Take the
Wheel” in Branson! Standing proudly amidst the
already dazzling skyline, The Branson Ferris Wheel
delivers breathtaking views of the Ozark Mountains
and Branson’s entertainment corridor, while offering
a relaxing ride that’s perfect for couples and
families.
Whether you board a gondola during the day to see
for miles out over the horizon, or at night to really
take in the 16,000 color-changing LED lights, The
Branson Ferris Wheel is a must-see and must-do.
Keep the ride going at The Track Family Fun Parks
with a mix of new and classic attractions. There’s
fun to be had by all ages at all three of our Track
locations. Experience three unique high-rise go-
kart tracks, classic go-karts, laser tag, bumper
boats & cars, batting cages, kids' rides,
mini golf, thrill rides, arcades and two
new rides - Thunderstruck and the
Spinning Coaster.
h Branson
V ISIT MULTIPLE L O C A TIO N S | 4 1 7 .334. 1 6 1 2 | C O NNE C T @ B R A N S O N T R A C K S Get unlimited
go-karts and rides for
all day to all year with
an unlimited park pass!
GET THE BEST PRICE ONLINE AT BRANSONTRACKS.COM
N ew R id es
O P E N N O W !
Y O U W O N ’T W A N T
T O M I S S T H E M .
THE FUN
IS NEVER
DONE!
THE
VIBE
417.334.1612
BRANSONTRACKS.COM
LOCATED AT TRACK 4
RideDid You Know?
• 240 PEOPLE CAN RIDE THE WHEEL
AT THE SAME TIME
• THE WHEEL WEIGHS MORE THAN
65 SPACE SHUTTLES
• THE WHEEL SPINS 100 REVOLUTIONS
EVERY DAY
• ITS FOUNDATION W AS CONSTRUCTED
USING OVER 4 MILLION POUNDS OF
CONCRETE, OVER 6 MILLION POUNDS
OF GRAVEL AND 80,000 POUNDS
OF STEEL
• STANDING 150 FEET TALL, THE WHEEL IS
TALLER THAN:
- 20 SHAQUILLE O’NEALS
- 8 GIRAFFES
- 5 1/2 TOUR BUSES
FIVE STAR
PARKS & ATTRACTION
S
417.334.1612
BRANSONTRACKS.COM
LOCATED AT TRACK 4
CONT ACT REFERENCE:
Bethany Rose
Regional Marketing Director
Five Star Parks & Attractions
[email protected]
(816) 838-7269
CONT ACT REFERENCE:
Kayla Halchak
Membership Manager
South Carolina Aquarium
[email protected]
(843) 579-8541
CREA TIVE DEVELOPMENT
7.a
Packet Pg. 311
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 29 CONTRACTOR CAPABILITY &
REFERENCES
CONT ACT REFERENCE:
Leslie Herring
City Administrator
Westwood, KS
[email protected]
(913) 942-2128
› Free Admission ‹› Free Admission ‹
FOOD | DRINK | MUSIC | KIDS’ ACTIVITIESFOOD•DRINK•MUSIC•KIDS’ ACTIVITIES Band- One Blue Note
Free Kids’
Activities - Bounce Houses • Balloon Artist
Crazy Hair Artist • Airbrush Tattoo Artist
Sunday, June 5Sunday, June 5 Noon - 4pmNoon - 4pm
2809 W. 47th Ave2809 W. 47th Ave
Check Out This
Event on Facebook
Benefiting Junior Achievement
CONT ACT REFERENCE:
Evan Thomason
Economic Development Associate
City of Santa Clarita
[email protected]
(661) 255-4347
7.a
Packet Pg. 312
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 30 CONTRACTOR CAPABILITY &
REFERENCES
SEARCH ENGINE MARKETING
THE CHALLENGE
Lundmark had been a valued partner of Visit Santa
Clarita, the City’s destination marketing organization, for a number of years. After demonstrating success
with their annual marketing campaigns, Lundmark was
enlisted to optimize their website, VisitSantaClarita.com.
THE SOLUTION
Our efforts began with a comprehensive SEO audit
utilizing tools including Ahrefs and Yoast. The initial audit analyzed search visibility, reviewed indexed pages and
identified known issues, reviewed backlinks and domain
authority, analyzed top organic landing pages, and made recommendations on content. The SEO audit established
a baseline foundation for the SEO strategy moving
forward.
On an ongoing monthly basis, Lundmark conducts site
crawls to review website metadata and check for broken
links, monitor top referring sites and channels, and
identify search competitors. The results of our monthly efforts are outlined in a progress report that also outlines recommendations for the following month’s SEO efforts.
THE RESULT
VisitSantaClarita.com has been steadily improving its
site health with each month’s search engine optimization efforts. These efforts enhance user experience by
reducing broken links and optimizing site speed for better overall performance.
CASE STUDY: WEBSITE SEARCH ENGINE OPTIMIZA TION
7.a
Packet Pg. 313
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 31 CONTRACTOR CAPABILITY &
REFERENCES
THE CHALLENGE
Crown Center, a shopping and entertainment
district located in Kansas City, Missouri
looked to increase its brand visibility by
gaining stronger website traffic and online
exposure overall. Lundmark was tasked
with developing a PPC strategy that would
strengthen their account performance and
lead to an increased awareness of the
shopping center and merchants.
THE SOLUTION
We started our process by evaluating their
current paid search efforts across Google,
Yahoo, and Bing. We analyzed the keyword
performance and conversion types, while
also reviewing the campaign and ad group
performance to ultimately execute a PPC
strategy for improvement moving forward.
THE RESULT
Over the past 5 years, we have consistently
increased their monthly impressions, clicks,
and conversions, while providing a monthly
PPC report to highlight areas of growth and
future focus areas.
CASE STUDY: PPC MANAGEMENT
7.a
Packet Pg. 314
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 32 CONTRACTOR CAPABILITY &
REFERENCES
INFLUENCER MARKETING
THE CHALLENGE
Crown Center, a family-centric shopping and
entertainment district in Kansas City, engaged
Lundmark to manage omnichannel campaigns
aimed at promoting exhibits and programming
throughout the year. The agency was specifically
tasked with developing and executing influencer
campaigns to capture new audiences and enhance
brand awareness and loyalty.
THE SOLUTION
Lundmark assessed the digital influencer
landscape within the Kansas City region to identify
top creators who specialize in family-friendly
content. The strategy included partnering with
established creator groups and prominent local
influencers. Lundmark oversaw the coordination,
content management, scheduling, and reporting,
ensuring each campaign delivered the intended
messaging effectively.
THE RESULT
Every campaign has been bolstered by the
authentic, user-generated content from the
influencers. Specifically, during the Christmas
campaign, the content reached over 100,000
individuals, with more than 40% being non-
followers of Crown Center’s social accounts. The
campaigns resulted in over 1,000 new followers
and garnered more than 150,000 content views.
Due to the outstanding performance, Crown
Center has chosen to invest more in influencer
marketing than other traditional marketing tactics
they had previously favored.
CASE STUDY: INFLUENCER MARKETING
7.a
Packet Pg. 315
Attachment: Lundmark Proposal (TMD Advertising Contract Award) 33 ADDITIONAL DA T A
With more than a decade of experience in the industry, we understand the value and challenges facing destination marketing organizations like yours.
$1.3
TRILLION
Domestic and
international traveler
expenditures in the
U.S. in 2023
15 MILLION
American jobs
supported by direct
traveler expenditures
in 2023 80%
Of all domestic
travel was for leisure
purposes in 2023 $89
BILLION
In state and local tax
revenue in 2023
THE TRAVEL INDUSTRY: BY THE NUMBERS
*Source: U.S. Travel Association | https://www.ustravel.org/sites/default/files/2024-03/National%20Data_0.pdf
UNDERST ANDING THE INDUSTRY
Lundmark understands...
1. The importance of DMO’s building and
maintaining a positive relationship with the
business community.
2. The economic impact that leisure travel,
meetings and cultural/sporting events drive at
the local and regional level.
3. The value that travel and tourism provides
in the development/redevelopment of a
community.
4. Supporting this development can ultimately
lead to the further development of attractions
and amenities.
5.The necessity to keep local residents,
businesses and elected officials informed
of the great work accomplished by your
organization.
This understanding has provided value for Visit
Santa Clarita in the past and will undoubtedly do
the same moving forward into the future.
millennials
In the U.S.,
travel more than any other
generation (approximately 35
days per year), closely followed
by Gen Zers (approximately 29
days per year.)
480M
business trips,
an increase from
approximately 370M
in 2022.
In 2026, U.S.
travelers will take
Domestic flight
searches were up
for 2023 compared
to 2022 while
international flight
searches increased
64%.
25%
7.a
Packet Pg. 316
Attachment: Lundmark Proposal (TMD Advertising Contract Award) JUNE 4, 2024
PROPOSAL #ED-23-24-32
PART II - COST FILE
ADVERTISING CAMPAIGN
LUNDMARKADVERTISING.COM | 2345 GRAND BLVD., SUITE 200, KANSAS CITY , MISSOURI 64108 | 816.842.5236
7.b
Packet Pg. 317
Attachment: Lundmark Cost File (TMD Advertising Contract Award)
1.3.1.1 and 1.3.1.2
After careful review of this RFP, our budget overview and not to exceed fees for this project are listed below:
COST PROPOSAL
TOT AL ADVERTISING CAMPAIGN BUDGET - $294,000
MEDIA - $260,750
• 88.6% of the overall budget will be allocated toward media. No media commission will be taken from the budgeted Tourism Advertising campaign
AGENCY FEE - $33,250
• Research & Strategy Development - $8,500
• Creative Design - $12,250
• Campaign Management - $12,500
7.b
Packet Pg. 318
Attachment: Lundmark Cost File (TMD Advertising Contract Award)
1.3.1.3 Our not to exceed fees for this project are listed below:
SEARCH ENGINE MARKETING
MONTHL Y SEARCH ENGINE OPTIMIZA TION OF VISITSANT ACLARIT A.COM - $750 PER MONTH MONTHL Y PPC MANAGEMENT - $1,000 PER MONTH*
*Includes managing up to $5,000 per month in media spend. No commission will be taken on PPC media placed.
7.b
Packet Pg. 319
Attachment: Lundmark Cost File (TMD Advertising Contract Award)
1.3.1.4 Should additional media become available, Lundmark can plan and place this media at a commission rate of 10%.
ADDITIONAL MEDIA PLANNING –
PHASE 2 PLAN
7.b
Packet Pg. 320
Attachment: Lundmark Cost File (TMD Advertising Contract Award)
1.3.1.5 As a full-service agency, Lundmark has a wealth of capabilities and the ability to assist in areas outside the scope of this RFP, if desired. We can offer the City of Santa Clarita an $85 per hour rate and can provide a project estimate in advance of any work being conducted.
HOURL Y AGENCY FEE
7.b
Packet Pg. 321
Attachment: Lundmark Cost File (TMD Advertising Contract Award)
1.3.1.6 Lundmark can assess the digital influencer landscape and identify travel writers and creators who specialize in content that would resonate with Visit Santa Clarita’s target audience. Our responsibilities would include influencer discovery, development of a content calendar, payment coordination, execution management, and reporting.
Given the wide range of variables that would affect pricing for this initiative (number of influencers, length of campaign, etc), we can offer our hourly rate of $85 for this type of program. A project estimate that details fees more clearly can be developed once additional details are confirmed.
INFLUENCER MANAGEMENT PLAN
7.b
Packet Pg. 322
Attachment: Lundmark Cost File (TMD Advertising Contract Award)
Agenda Item: 8
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: August 27, 2024
SUBJECT: SAND CANYON TRAIL, PHASE IV, PROJECT T3024 - SUMMARY
VACATION OF A PORTION OF THE PUBLIC RIGHT OF WAY
AND SLOPE EASEMENT ALONG SAND CANYON ROAD AND
ACCEPTANCE OF EASEMENTS FOR ROAD AND TRAIL
PURPOSES
DEPARTMENT: Public Works
PRESENTER: Shannon Pickett
RECOMMENDED ACTION
City Council:
1. Adopt a resolution for the summary vacation of a portion of the public right-of-way along Sand Canyon Road, as described and shown on Exhibit “A” Legal Description and Exhibit “B” Exhibit Map, and an easement for slope purposes, west of Sand Canyon Road, as described and shown on Exhibit “C” Legal Description and Exhibit “D” Exhibit Map of the attached resolution.
2. Authorize the City Clerk to record the certified original resolution in the Los Angeles County Registrar-Recorder’s office.
3. Authorize the City Manager, or designee, to accept the dedications and grants of easement for public use and trail purposes and grants of easement for public use and road purposes along Sand Canyon Road.
4. Authorize an expenditure in an amount not to exceed $80,000 to reimburse the property owner for clearing private improvements from the future trail easement at 16207 Valley Ranch Road as part of the Sand Canyon Trail project.
5. Authorize the City Manager, or designee, to execute all documents, subject to City Attorney approval.
BACKGROUND
8 Packet Pg. 323
BACKGROUND
Road and Slope Easement Vacation
The road easement to be vacated, shown in blue on the attached Location Map for property on 27101 Sand Canyon Road, is a portion of Lot 3 of Parcel Map No. 8244, originally dedicated to the County of Los Angeles on December 6, 1984. The slope easement to be vacated, shown in yellow on the attached Location Map, is a portion of Lot 2 and Lot 3 of Parcel Map No. 8244, originally dedicated to the County of Los Angeles and recorded on December 6, 1984.
Both easements traverse through a private residential lot located on the west side of Sand Canyon Road. The portion of the street easement and the slope easement, as described and shown on Exhibits “A” through “D” of the attached resolution, are in excess of the specified 84 feet of right-of-way required for Sand Canyon Road in the Circulation Element of the City’s General Plan, and are not needed for future public road purposes.
Per Section 8331 of the Streets and Highways Code, the legislative body of a local agency may summarily vacate a street or highway if both of the following conditions exists:
1. For a period of five consecutive years, the street or highway has been impassable for vehicular travel; and
2. No public money was expended for maintenance on the street or highway during such period.
Both of the aforementioned conditions exist; therefore, staff is recommending a portion of public right-of-way and slope easement as described and shown on Exhibits “A” through “D” of the attached resolution be summarily vacated by adopting the resolution.
In compliance with Section 8340 of the Streets and Highways Code, City staff coordinated with public utilities and determined that there are no public utility facilities in place that would be affected by this vacation, and no reservation of easement is necessary for prospective public use.
Road and Trail Dedication
The property owner at 27101 Sand Canyon Road has offered to dedicate an easement for public use and trail purposes within the property and an easement for public use and road purposes along the property frontage on Sand Canyon Road as shown in green and red, respectively, on the attached Location Map for property on 27101 Sand Canyon Road. The trail easement will allow for a trail connection from the recently installed pedestrian bridge on Sand Canyon Road just north of Condor Ridge Road to Sultus Street, and the road easement will increase the right- of-way of Sand Canyon Road to 84 feet, which is consistent with the Circulation Element of the City’s General Plan.
The property owner at 16207 Valley Ranch Road is willing to dedicate an easement for public 8 Packet Pg. 324
use and trail purposes and an easement for public use and road purposes along the property frontage on Sand Canyon Road as shown in green and red, respectively, on the attached Location Map for property on 16207 Valley Ranch Road. The trail easement will allow for a trail segment to be constructed along Sand Canyon Road, and the road easement will ensure that the constructed portion of Sand Canyon Road is within the easement. Furthermore, the road easement will ensure that the westerly edge of the easement lines up with the westerly edge of the public right-of-way on Sand Canyon Road, south of Valley Ranch Road.
Trail construction within the trail easement will require private improvements such as fencing, irrigation, and landscape to be relocated. The $80,000 expenditure recommended in this agenda report will reimburse the property owner for removing those improvements and relocating them outside the easement areas. Once removed, this segment of trail will be constructed.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
Adequate funds are available in project expenditure accounts T3024233-516101 (TDA 8 Fund) and T3024238-516101 (TDA 3 Fund) to support the recommended action.
ATTACHMENTS
Resolution
Location Map for 16207 Valley Ranch Road
Location Map for 27101 Sand Canyon Road
8 Packet Pg. 325
RESOLUTION NO. 24- _______
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SANTA CLARITA,
CALIFORNIA, SUMMARILY VACATING A PORTION OF THE PUBLIC RIGHT-
OF-WAY AND AN EASEMENT FOR SLOPE PURPOSES LOCATED ALONG SAND CANYON ROAD, CREATED ON PARCEL MAP NO. 8244, FILED IN BOOK 174 PAGES 14 AND 15, OF MAPS
WHEREAS, the offer of dedication being summarily vacated fully meets the requirements of Section 8331 of the Streets and Highways Code, which states “The legislative body of a local agency may summarily vacate a street or highway if both of the following conditions exist: (a) For a period of five consecutive years, the street or highway has been impassable for vehicular travel. (b) No public money was expended for maintenance on the street or highway during such period”; and the current owner requests that a portion of the public right-of-way be vacated; and WHEREAS, under Chapter 4, Summary Vacation of Part 3 of Division 9 of the California Streets and Highways Code, no public hearing is required and no public hearing was held.
NOW, THEREFORE, pursuant to the provisions of the California Streets and Highways Code, the City Council of the City of Santa Clarita, California, does hereby resolve as follows:
SECTION 1. That it is hereby found and determined that a portion of the public right-of- way along Sand Canyon Road, as described in Exhibits “A” Legal Description, and as shown on Exhibit “B” Exhibit Map, and an easement for slope purposes, as described in Exhibits “C” Legal Description, and as shown on Exhibit “D” Exhibit Map, attached hereto and incorporated herein by this reference, which real property located in the City of Santa Clarita, County of Los Angeles, State of California, fully meets the requirements of Section 8331 of the Streets and Highways Code, which states “The legislative body of a local agency may summarily vacate a street or highway if both of the following conditions exist: (a) For a period of five consecutive years, the street or highway has been impassable for vehicular travel. (b) No public money was expended for maintenance on the street or highway during such period.” and such offer of dedication is therefore vacated, subject to Section 2 herein.
SECTION 2. That within the street to be vacated, there are no public utility facilities that would be affected by the vacation.
SECTION 3. That the City Clerk of the City of Santa Clarita is instructed to record the certified original resolution in the office of the Registrar-Recorder of the County of Los Angeles, at which time the easements summarily vacated will no longer be public service easements.
S
ECTION 4. The City Clerk shall certify to the adoption of this resolution.
8.a
Packet Pg. 326
Attachment: Resolution (SAND CANYON TRAILS)
P
ASSED, APPROVED, AND ADOPTED this ____ day of _____________ 2024. ______________________________
MAYOR
A
TTEST:
_______________________________
CITY CLERK
D
ATE:__________________________
S
TATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) ss.
CITY OF SANTA CLARITA )
I, Mary Cusick, City Clerk of the City of Santa Clarita, California, do hereby certify that the foregoing Resolution 24-_____ was duly adopted by the City Council of the City of Santa Clarita, California at a regular meeting thereof, held on the ___ day of ___________ 2024, by the following vote:
AYE
S: COUNCILMEMBERS:
NOE
S: COUNCILMEMBERS:
AB
SENT: COUNCILMEMBERS:
______________________________
CITY CLERK
8.a
Packet Pg. 327
Attachment: Resolution (SAND CANYON TRAILS)
8.a
Packet Pg. 328
Attachment: Resolution (SAND CANYON TRAILS)
8.a
Packet Pg. 329
Attachment: Resolution (SAND CANYON TRAILS)
8.a
Packet Pg. 330
Attachment: Resolution (SAND CANYON TRAILS)
8.a
Packet Pg. 331
Attachment: Resolution (SAND CANYON TRAILS)
8.a
Packet Pg. 332
Attachment: Resolution (SAND CANYON TRAILS)
8.a
Packet Pg. 333
Attachment: Resolution (SAND CANYON TRAILS)
8.b
Packet Pg. 334
Attachment: Location Map for 16207 Valley Ranch Road (SAND CANYON TRAILS)
8.c
Packet Pg. 335
Attachment: Location Map for 27101 Sand Canyon Road (SAND CANYON TRAILS)
Agenda Item: 9
CITY OF SANTA CLARITA
AGENDA REPORT
CONSENT CALENDAR
CITY MANAGER APPROVAL:
DATE: August 27, 2024
SUBJECT: PURCHASE TRUCK-MOUNTED LONG LINE PAINT STRIPER DEPARTMENT: Public Works
PRESENTER: Cruz Caldera
RECOMMENDED ACTION
City Council:
1. Approve the “piggyback” purchase of a truck-mounted long line paint striper, EZ Liner TS- AL150, using Sourcewell contract #080521-EZL, for a total contract amount not to exceed $288,755.
2. Authorize the City Manager or designee to execute all contracts and associated documents, subject to City Attorney approval.
BACKGROUND
The City of Santa Clarita’s (City) Public Works Department maintains over 1,300 linear miles of road striping each year. The City’s long line paint striper assists staff in re-striping edge lines, double yellow and skip lines, as well as bike lane and turn pocket lines throughout the City. The City’s existing striper has exceeded its useful life. Maintenance needs and increasingly obsolete replacement parts take the striper out of service for long periods of time. During the Fiscal Year (FY) 2024-25 budget process, the City Council authorized the procurement of a replacement truck-mounted long line paint striper.
Staff has determined that an EZ Liner Model TS-AL150 with a 2024 Isuzu NPR HD chassis will serve as an equivalent replacement. The new striper will allow staff to stripe approximately 15 lane miles per day, is more accurate, and has additional safety features than the current model, improving staff productivity.
The use of “piggyback” purchasing allows the City to place orders against a competitively awarded public agency contract. The City is using the cooperative purchasing contract, #080521- EZL with Sourcewell, which allows the City to take advantage of an existing competitive 9 Packet Pg. 336
process. This contract, which was awarded on October 11, 2021, was competitively solicited through a nationwide bid process and is valid through October 2025.
While the vast majority of the City’s fleet is procured locally, the striper is a specialized piece of equipment requiring special features and customization. After performing a cost analysis, the General Services Manager determined that the Sourcewell cooperative purchasing contract with EZ Liner provides competitive pricing, provides quality service, and offers the best value to the City. Additionally, there are no local vendors that provide truck-mounted long line paint stripers on a cooperative purchasing contract. Using the Sourcewell cooperative purchasing contract results in a total sale price of $288,755, inclusive of tax and delivery.
This purchase supports the Sustaining Public Infrastructure theme of Santa Clarita 2025.
ALTERNATIVE ACTION
Other action as determined by the City Council.
FISCAL IMPACT
The resources required to implement the recommended action are contained within the City’s adopted FY 2024-25 budget; $288,755 is available in the Gas Tax fund (Fund 230), Street Maintenance-Equipment Replacement expenditure account (2304504-520102).
ATTACHMENTS
Sourcewell Contract (available in the City Clerk's Reading File) EZ Liner Proposal (available in the City Clerk's Reading File) 9 Packet Pg. 337