Proposal for
City of Santa Clarita
Prepared by
11-25-2024
Job # 111855-01
Begonias Lane Park Playground - Response File
435-901-9544 | www.gwpark.com
Great Western Recreation | Quinn Connell 435-901-9544 _ [email protected] Table of Contents
Introduction / Work Statement ……………………………………………………………………………………………………………..

Concept Plans ……………………………………………………………………………………………………...........................

Project Schedule ……………………………………………………………………………………………………………………….

Ancillary Docs ……………………………………………………………………………………………………………………………. 3-14
15-37
38 40-70
RFP# POS-24-25-P3036

GREAT WESTERN INSTALLATIONS, INC RESPONSE
TO: The City of Santa Clarita

INTRODUCTION
It’s a pleasure, as Great Western Installations, Inc, as well as on behalf of the entire Project Team, to provide a detailed response to the RFQ #PPOS- 24- 25-P3036 for the Design-Build of the Play Area at Begonias Lane Park.

The current RFP has been carefully reviewed and vetted, after a full submission of the previously released RFQ, and we are confident that we are uniquely positioned to be the ideal choice for the City of Santa Clarita for the creative and efficient completion of this project. We have reviewed the objectives and scope in great detail, specifically on the RFP under Scope of Work and believe we have compiled a solid Design-Build Team that addresses each and every item within the boundaries of the City’s objectives and desired scope, including the ability to work collaboratively, smoothly, and closely with City staff in performing the turnkey work proficiently; within the established time schedule and budget, not to exceed $1,000,000. Our understanding of the project mirrors the City’s objectives, such as,
FULL TURNKEY, DESIGN-BUILD SCOPE:
• Demolition and removal of existing play areas and surrounding landscape areas, as needed
• Procurement and installation of new play equipment
• Construction of new play area totaling roughly 4,265 SF o Play equipment will focus on Nature Theming
• Providing and installing any necessary signage
• Providing and installing full, PIP Rubber Resilient Safety Surfacing that meets ASTM standards for both safety and ADA accessibility o Includes full customized theming in the flooring itself to add play value and highlight the unique play space
o Includes TPV Premium cutouts for high friction areas for greater longevity and of the safety surfacing
• Providing and installing seating solutions for the overall park and play areas for both children and adults
• Keeping existing shade, for maximize UV protection and comfort of park patrons
o Includes integrated shades on play equipment
• Providing and installing fenced play spaces with limited points of aggress/ egress
• Providing and installing any required landscape improvements as immediately needed in the overhaul of the new park layout and adjacent to new construction
• Coordination of connections to existing site conditions and park amenities in the park renovation and ADA upgrades if necessary
• Coordinating through the design-build process to accommodate for all existing site utilities by using resources like DigAlert, as-builts, etc. • Providing, in this packet, a broken out, complete scope to reflect the proposed SOV of each piece to be performed on the entire Design-Build process, line-itemized, reflecting the detail-oriented nature of the DesignBuild Team to understand the full complexities of the overall project o Included in Cost Proposal, submitted separately
ADDITIONAL CONSULTING SCOPE TO BE COMPLETED BY THE DESIGNBUILD TEAM:
• Providing and coordinating all design services for a full construction plan set including landscape architecture, civil engineering, site survey, and any other necessary discipline to compile a complete set of construction plans and specifications
o Ensuring that all meet current California Codes, ADA requirements, the City’s UDC, Standards for Public Works Construction, and Standard Green Book specs
• Providing designs of play area and how it fits within the overall park concept
o Options included in this Response Packet
o Includes Shade Structures, along with all needed stamped engineering and calcs to pull City Building Permits, as needed • Coordination with City Staff on full submittals for selection of materials, colors, styles, etc by providing samples and mockups in a prompt manner to achieve the City’s final aesthetic for the fit and finish of the products to be supplied
• Providing landscape, hardscape, and any irrigation design, as needed, for the integration of the renovation into the existing site conditions • Coordination and hosting assistance of at a minimum two Community Outreach Meetings to determine feedback for the design intent of the project and desired outcomes
o Includes continual changing of plans to meet community needs as they are identified throughout the design-build process and in coordination with the City’s interest
• Coordination with the City on the NEPA environmental review, as needed • Compliance to all CDBG Funding Requirements and necessary processes • and paperwork
• Preparing and submitting all applications, 25%, 75%, and 95% construction documents, and any other materials needed to pull and complete the necessary City Building Permits
• Committing fully to the constant Project Management of the Design-Build, from the initial onset of design to the overseeing of construction activities towards the ultimate completion of the project by our dedicated and experienced staff
• Providing required 3rd party audits before final turnover of the project to the City
Per the City’s recommendation, we have incorporated all aspects of the desired Scope of Work and are prepared to not only meet all the minimum requirements per the requested scope, but to exceed those expectations with an amazing group of experienced and highly qualified individuals and organizations as part of our Design Build Team that is tested and proven.

WORK STATEMENT
Our mutual success on this project will be accomplished by adhering to the Tasks as provided by the City. Great Western Installations, Inc has partnered with multiple exceptional entities, each with their own set of qualifications and expertise, in this goal towards realizing the Tasks outlined by the City of Santa Clarita. These entities (including Great Western Installations, Inc.), along with their scope, structure, and role, are as follows:
• Great Western Installations, Inc— GWI will act as the General Contractor and project lead in this endeavor. GWI is a California B, C61/D34 Licensed Contractor and is current with DIR registration. GWI holds the necessary bonding capacity and insurance required, including professional services insurance, builder’s risk insurance, and completed operations insurance, beyond the requested requirements. GWI also, in partnership with its sister company, Great Western Recreation, are the exclusive distributors for Playcore and GameTime products in Southern California and have a full administration and design team to assist with the overall management of the project’s finalization from award to completion.

GWI was established in 2007 and has completed, in conjunction with GWR and GT, thousands of projects, including many inclusive play areas, throughout the Western U.S. Tyler Kyriopoulos, President and CPSI, will be the point person for the project and will assist with all coordination. *Additional information on the company can be found at www.gwpark.com • Playcore Wisconsin, Inc— Playcore is the corporate holding company that owns and operates nearly 40 manufacturing organizations. Beyond owning several of the manufacturing companies that we’ll be utilizing in this project, they have established a prominent department called CORE, the Center for Outreach, Research, and Education. CORE will be heavily involved in the Inclusive Design aspect of the project, under the direction of Jennie Sumrell, utilizing their 7 Principles of Inclusive Play (details here) and Play Together programs based solely on case studies and research in the field of Inclusive and Universal Design. Furthermore, Playcore will be managing the aspects for the National Demonstration Site programs and compiling all the preliminary data for the park usage, both before the park renovation and after, and provide full reports for the City use (examples of a similar project at Beattie Park in Lompoc, CA are included in the ancillary documents) *Additional information on the company can be found at www.playcore.com
• GameTime— GameTime, a Playcore company, will be assisting in both the design of inclusive and nature play elements, as well as providing the materials for the playground. GameTime is Playcore’s largest company and was established in 1929. They’ve since been providing the finest quality and most innovative playground equipment in the industry, boasting the best warranty in the playground realm. GameTime’s custom design division, Landmark Design, will be instrumental in coordinating the themed concepts to be included in the inclusive play environment being proposed at Begonias Lane Park *Additional information on the company can be found at www.gametime.com
• RRM Design Group— RRM will be the landscape architect and engineering company on the project. RRM was established in 1974 and currently has 130 employees, multiple offices, and has a multitude of inclusive play area designs under their belts. RRM will be providing the topographical survey, site plans, irrigation plans, landscape plans, and any other associated plans and engineering needed. They will also be assisting with community meetings and outreach and finalizing all construction documents and assisting with the permitting process. They are extremely familiar with the process that the City requires, having been part of the Design Build Team at Canyon Country Park in partnership with GWI. *Additional information can be found at www.rrmdesign.com • TJ Janca Construction Inc—TJ Janca Construction Inc, Inc will be handling all the construction on site. TJ Janca has years of expertise in a full spectrum of scope, including all the necessary elements involved with site prep, installation, and close out of the project at Begonias Lane Park.

They have completed multiple projects of similar nature and scope, and bring a level of professionalism and craftsmanship that is unparalleled in the industry. In addition to install TJ Janca will be providing the materials and completing the installation of the resilient safety surfacing. They are the largest and best equipped entity for the installation of the highest quality Pour in Place Rubber Surfacing that will be utilized in this project, maximizing our ability to provide an inclusive play space that is safe, durable, and aesthetically pops.

This Design-Build Team is uniquely positioned to take a comprehensive and technical approach to the various Tasks required by the RFP. That approach to the Tasks is as follows:

Task 1- Project Management
The DB Team will be spearheading all aspects of the project management, along with incorporating City Staff into the process, towards the completion of the project.

This will be completed by initially establishing the requested Project Development Team (PDT), consisting of the key players from each organization involved in the project. Upon receipt of the Award and/or NTP of the project, the Team will be gathered, and initial meetings scheduled, to introduce all pivotal personal that will constitute the PDT and set milestones for the various tasks ahead. These milestones will include budgets, timelines, design requirements, and the means and methods to be used over the course of the entire project from onset to completion. The PDT will continue to coordinate the smooth workflow and realization of project milestones with a regularly scheduled (ideally weekly or bi-monthly) project meeting either virtual and/or in person (or on-site as the project moves into the construction phase) to keep the City up to date on the status of the project. These meetings will be organized with agendas, minutes, and all backup in written format to keep all entities apprised of updates and keep a log of the process. All visuals needed will be provided by the DB Team towards coordination of schedules, designs, potential items to be addressed in the field, and other considerations for the project. Any additional meetings needed to coordinate with outlying agencies (ex. Building & Safety) will be broached by the PDT and organized accordingly.

Task 2- Preliminary Investigation
The DB Team will pursue obtaining all existing backup documentation, site conditions details, and other existing information available on the site, project, and City requirements, and implement those existing resources at the onset of the project.

This will be accomplished by collecting existing plans from the City, asbuilts of the park, any relevant utility documentation, past upgrades/changes to the park design, review of existing ADA applications, etc towards this effort. This includes initial site visit by the entire aforementioned PDT to evaluate any additional information to be gleaned on site as a collective Team. These findings will be used by the DB Team towards the preliminary site plans for the upcoming renovations. The DB Team will be responsible for assessing and taking responsibility for those existing resources and will also coordinate the site survey to be completed by licensed and trained professionals to confirm site conditions and assist in finalizing the comprehensive construction scope and costs.

Task 3- Design
The DB Team will be solely responsible for completing the necessary planning and compiling the needed designs for this project, including the Play Equipment Designs, Site Plan Designs, and Landscape/Hardscape Plans.

Furthermore, the complete SOV and Construction Cost Estimate will be composed for final review and acceptance by the City.

This overarching Task will be accomplished by initially reviewing with the PDT the scope of itemized tasks listed for the project, the implementation of any needed required NEPA requirements, the comprehensive project schedule with milestones, the preliminary cost estimates as they adhere to the overall budget, the current site conditions and proposed location of the play spaces for maximize usage, and any other early considerations for the project design. From that point, the DB Team will commission the site survey to be completed and incorporate the subsequent topographical plan and utilize that on the first, official 25% construction set, showcasing the scope of work, necessary grades, ADA accessibility, product/material placement, and other considerations for the overall general design. All design elements will be done in a collaboration with the City to ensure all design aspects and scope are reviewed and approved by City Staff.

The DB Team will also use their extensive expertise in the field of Inclusive and Interactive Play and put together full schematic drawings of the play areas, including surrounding hardscape, shades, amenities, and so forth, in that collaboration with the City for their review, input, and ultimate approval.

These will include detailed 2D drawings, renderings/mockups with multiple angles, Lumion video fly throughs, as requested, and material/color selections processes.

Any and all Community Outreach Events’ feedback will be incorporated into the plans as they develop; once a minimum of the 25% construction plans are completed for review. These plans will then be reviewed between the DB Team and the City toward the final selection of approved play equipment for use on the project. Once a final design is chosen, then the DB Team will provide all backup marketing materials needed for notifying the public, providing mockups, videos, posters, and other materials, as needed.

The DB Team, spearheaded by RRM Design at this juncture, will then work up the next phase of landscape plan sets. These will include hardscape and irrigation considerations, grading issues that need to be addressed, hardscape changes/additions, landscaping areas, and other elements to be included in that overall scope. The DB Team will rely on the City’s recommendation for requested landscape needs towards that end, while also incorporating best practices for the region. This final plan will be compiled together with the playground design as a full construction set.

Finally, the DB Team will carefully highlight the detailed scope and costs to effectively complete the project, as planned, keeping within the budget and timeline for completion. This will include line items for each part of the scope to be performed, highlighting the costs for each piece of the project to be done.

Adjustments will be made in collaboration with the City, as needed, to ensure it meets the Tasks required.

Task 4- Construction Documents
The DB Team will compile the full set of construction plans, in phases, that incorporate all aspects for the successful submission for permits, and the ultimately successful completion of the site renovation, including Civil Engineering, Architectural Plans, Landscape Plans, Specification Sheets, and all other requirements.

This Task will be accomplished by the DB Team putting together the Civil Sheets, detailing the existing site conditions and proposed demolition of existing hardscape, amenities, and managing that demolition with the existing utilities and areas outside of the Area of Work. This portion will address concerns and a plan for stormwater compliance, as part of the design considerations. It will also take into account the existing ADA conditions of the site and identify any areas that will require attention for compliance. Any grading, drainage, or retaining walls needed will be included in this portion of the plan set, along with identifying existing utilities.

The DB Team will also put together the Architectural Sheets for the construction documents. These include the details for the construction of the play equipment, site amenities, shade structures, drinking fountain, and other site elements that are a part of the overall project. This will include any stamped structural plans needed for the shade structures and will address any concerns for electrical and/or plumbing, if needed.

The Landscape Sheets will be included in this overall construction plan set by the DB Team. This includes addressing any sidewalks, curbing, and other hardscape that will be required for the transformation of the play space. It will also include any planting needed and will review that aspect with the City for placement and approval.

The Design-Build Team will also include a full specification packet as part of the construction documents, in CSI format, identifying the materials and products used, details on those products, along with written details on installation, usage, performance, and so forth. The DB Team will also coordinate submittal packets for the City’s review and approval for materials, color selections, and other aspects as joint approach to receiving the correct items in the field per design and spec.

The Construction Documents will be compiled in a full, organized manner and a meeting will be scheduled to review final plans with the City to go over the plans, in details, in final review. As mentioned, all plans will be prepared in phases at 25%, 75%, and 95%, and will be completed in the formats requested by the City. Once all final plans are complete, hard copies will be provided to the City for its records and future use, as well as versions in digital format.

Task 5- Plan Review & Permits
The Design-Build Team will complete all plan submission and permit retrieval through the City’s processes.

This Task will be completed by taking the full plan set and calculations to the City Building & Safety Dept and submitting the appropriate application for permit, providing all the necessary backup plans and details, and working through any red line items for resubmittal and ultimate final approval by the B&S and pulling the required permits for the project. The initial submission will be done electronically, per the City’s request, but in-person plan review is expected and welcomed to get the permits pushed through in an timely manner. Any corrections needed will be addressed and resubmitted in a prompt fashion. Any and all clearances from various City Agencies will be obtained as well, including Fire, Zoning, Environmental, Community Development, and any other required agency for sign off on the final plans.

Task 6- Construction Administration & Management
The DB Team will be coordinating all construction management and logistics, as well as performing all required construction in the field, towards the efficient and successful completion of the project’s scope of work and all finalization of punch lists, records drawings, and any other ultimate tasks for terminal completion of the renovation.

The final Task will be accomplished by the DB Team with a collaborative approach in managing the various Sub-Contractors on site performing the work.

The DB Team will assign a Project Manager, as well as a Site Superintendent, to ensure that adequate attention is given in the field on a daily basis. This will include providing a detailed schedule with milestones on construction, coordinating deliveries of all equipment and materials on site, maintaining proper site safety and security, coordinating site inspections with City Staff and/or Building Officials, and construction of all play apparatuses, shades, site amenities, hardscape, safety surfacing, and all other elements as part of the overall approved plan. Should any Special Inspections identify work that needs improvement, the DB Team and on-site Project Management will take steps for corrective actions and ensure the project is completed to the satisfaction of the City. Any and all submittals and RFI’s will also run through the DB Team for reviw and collaboration with City Staff.

Upon substantial completion of the project, the DB Team, along with the City, will make preparations for a site visit and comprehensive inspection in order to identify a punch list of items for final completion. These will be completed in short order by the DB Team. They will coordinate any 3rd Party inspections for the play equipment and safety equipment, by a CPSI, and provide the report to the City. Once punch list items are resolved, the DB Team will move towards turning the project over to the City.

Record Drawings and as-builts will be provided to the City by the DB Team, as well as Owner’s Manuals, Maintenance Guides, Executed Warranties, hardware kits, touch up paint, and any other materials and/or resources required by the City for final completion. The City’s Construction & Demolition Plan Form will be completed and submitted for sign off.

The DB Team will also assist the City with marketing, news bulletins, promos, and other means towards hosting a Grand Opening event and registering the project under the National Demonstration Site Network. Details of the NDS Program are in the Ancillary Documents to this Response Packet. Part of that is the data and analytics provided by the CORE group, as part of using this program. Three comprehensive and data-driven reports will be provided to the City as takeaways; the Initial Impact Report, Baseline Outcomes, and Visitor Outcomes. Examples of those are in the Ancillary Documents, but these reports will be given to the City to be used for providing outcomes and feedback on the project to decision-makers for justification of the monies spent on this renovation, as well as providing statistical backup proving health benefits for the community with park improvements by the Dept.

In conclusion, this Design-Build Team is prepared and fully capable to handle the complexities of this project in stride and deliver a wonderful renovation to Begonias Lane Park. The entire Design-Build Team is excited for the chance to join the City of Santa Clarita once again in a collaboration for the betterment of the community.

Sincerely,
Tyler Kyriopoulos, CPSI
President
Great Western Installations, Inc
06/26/2023
**Additionally, in the full RFP Response Packet and ancillary documentation, you will find the following:
• Detailed Concept Plans including Renderings for Park Renovation • Detailed project schedule including milestones
• Company information
• GWI
• GameTime/Playcore
• RRM Design
• Key Personnel Bios and Roles
• References
• Additional references in depth can be seen here
• Environmental Information on GameTime
• Warranty
• Color Choices
• Sub-Consultant Form
• Sub-Contractor Form
• All other forms requested in the RFP, individually submitted via BidNet Direct

BEGONIAS LANE PARKDESIGN-BUILD SCHEDULE
• RFP Submitted/Due- November 25th, 2024
• Evaluation of Proposals- December 2024
• Contract Notice to Award- December 2024
• Contract Review/Finalization- December 2024
• Initial Meeting with PDT- January 2025
o Includes on-site visit by entire Design Build Team
o Weekly or Bi-Monthly meetings of PDT to continue throughout the project
• Provide initial play area concepts for review/collaboration with the City- January 2025
• Proceed with site survey by RRM Design- January 2025
• Re-draw designs based on initial City feedback- January 2025 • Provide 25% Plans with Play Area Concepts- January 2025 • Host minimum of two community meetings- February 2025 • Incorporate community meeting input with finalized play area designsFebruary 2025 • Complete 75% construction plan set and submit to B&S- February 2025 • Concurrently move to procure/fabricate all needed equipment- March 2025 • B&S Review and Pulling Permits-March 2025
• Begin on site construction- April 2025
• Complete on site construction- April 2025
• Proceed with final inspections, closeouts, and turn over to City- May 2025 *Please note, the construction schedule is tentative and fluid. Certain outside factors, like Building & Safety Review and approvals, weather delays, material delays, etc could have impact on the schedule
Tyler Kyriopoulos, CPSI
President
Great Western Installations, Inc

ANCILLARY

DOCUMENTS
Great Western Recreation Background
In 1969, the same year Neil Armstrong made his historic first steps on the surface of the moon, Rich Boyce was beginning an adventure on Earth. He founded Boyce Recreation in Wellsville, Utah, and became the exclusive representative for GameTime in Utah and Wyoming. He continued exploring the world of play and recreation by expanding into Montana and Idaho, and later into Nevada.

In 1992, Steve Kyriopoulos, a former Parks Director for the City of Logan, Utah, began working with Rich. In 1999, Rich turned over the day-to-day operations to Steve. The company took on a new name - Great Western Park and Playground, Inc. In 2004, Steve looked westward and took steps to expand and provide park and playground products to the people of Southern California.

In 2016, Great Western took another step in its journey. Steve handed the controls to his son Tyler Kyriopoulos and Lewis Painter. Tyler and Lewis wanted to expand both the geographical reach and the services of the company and rebranded as Great Western Recreation (GWR). In 2020, GWR expanded operations into Washington and Alaska, bringing the total number of states we serve to eight.

GWR continues to be the exclusive representative for GameTime, as we have for more than 50 years.

GameTime is a leading manufacturer of commercial playground equipment for nearly a century. GWR also represents many complementary lines of commercial park equipment, including shelters, shades, site amenities, splash pads, bleachers, outdoor fitness equipment, athletic equipment, outdoor musical equipment, dog park elements, and more. We combine a comprehensive product portfolio with full turnkey services from initial design to field installation.

Our team includes seven full-time CAD designers, as well as a trained crew of rendering specialists, replacement specialists, order entry, customer service, and accounting specialists. We also employ ten CPSI-certified territory managers within our company who stay up-to-date with the guidelines from ASTM, CPSC, ADA, and IPEMA.

After 50 years, Great Western Recreation is more prepared than ever to provide the highest level of customer service, high-quality products, and a complete solution for all of your recreation projects. Let's embark on a journey together, and build amazing places where people love to play.

GameTime is a leading designer of commercial
playground equipment, outdoor fitness products,
custom recreation spaces, and site furnishings.

We strive to create the kinds of places people love
and where people love to play.

Play and recreation is a fundamental human right,
and we take our role in helping communities
create active, healthy places seriously. We
focus on inclusion, diversity and equity in
our playground designs, align our products
with the research of leading play, health, and
wellness experts, and advocate tirelessly for the
advancement of safer, more accessible and fun
places that bring people together.

This is our mission since 1929: to build the highest
quality products, design the most memorable
play and recreation experiences, and to lead the
industry with innovative solutions that help people
of all ages, all abilities, and all backgrounds realize the transforming power of play.

ABOUT GAMETIME
GameTime creates fun, healthy and active places where all children and families become physically, emotionally and socially strong. gametime.com | 800.235.2440
Great Western Installations Project Team
Tyler Kyriopoulos
Sales Representative/Owner
Tyler has been with Great Western Recreation since 1997, first as an installer and later as a Sales Representative and principal owner. This career path has made Tyler an expert at the construction level, as well as the design level, for playground projects. He has become one of the nation’s leading representatives for both Game Time, as well as Great Western Recreation. He coordinates hundreds of park and playground projects over the course of his career and demonstrates the ability to coordinate large and small projects quickly and efficiently. Tyler recently completed two All-Inclusive Play Spaces in similar size and scope at Canyon Country Park for the City of Santa Clarita and at Joy Playground for the City of Atascadero.

Lewis Painter
Design Lead/Owner
Lewis has been with Great Western Recreation since 1998. He has been working in the construction and design of play & recreation spaces for over 25 years. This foundation of knowledge and experience in building and designing has created a persistent focus on creating positive solutions allowing proactive avenues to achieve your project goals. This philosophy consistently yields positive outcomes for projects of any scale. Vast years of design experience foster forwardthinking and cutting-edge design innovation. Forward-leaning designs tempered with a foundation of construction knowledge and expertise allow him to guide each project to achieve its true potential. Creating positive outcomes instills a deep sense of pride in each project we work on! Although projects vary greatly, I pursue the same exceptional quality in each project. Integration of 25 years of experience brings a strength of knowledge and best practices ensuring the value and quality for you and those you serve in the community.

The creativity of designs ensures we meet the unique nature of the needs and criteria of your project.

Quinn Connell
Sales Representative
Quinn joined the Great Western Recreation team in 2020, she brings with her over eight years of sales experience and a playful exuberance to problem solving. A Seattle resident, Quinn has quickly become an expert in coordinating park and playground projects, big and small. She measures success by the happiness of her customers and the lasting relationships to follow.

Jenny Rogers
Human Resources
Jenny joined the Great Western Recreation team in March 2022. She brought with her nearly 20 years of retail experience in multi-state management, identifying shrink, Human Resources, and leadership development, with an extensive understanding and ability to develop policies and procedures. Jenny obtained her bachelor’s degree at Boise State University in criminal justice with a minor in business management. When not at work, Jenny hikes the national parks and enjoys watersports with her husband and children. She is excited to work for a company that encourages development and growth through outdoor experiences.

Sarauna Openshaw
Compliance Specialist
Sarauna started at Great Western Recreation in 2016 as a Project Coordinator. She served as Rendering and Lumion specialist and order entry backup for 3 years, then Manager of Sales Operations for two years before moving to Compliancy Specialist.

She brings with her experience in project and office management as well as accounting. Sarauna has been trained on GameTime’s specialty CAD program, Lumion, Sketchup, 3DS Max, and Premier Pro as well as CRM for quoting and ordering. She has created and implemented several new processes to improve the consistency and accuracy of orders being placed and continues to create new processes with contracts, credit, closeout documents, etc. to improve the flow of orders from start to finish.

Milisa Guthrie - Accountant
Milisa joined Great Western in 2018 as the Accountant. In this role, she leads all financial matters including accounting, reporting and cash management. Milisa spent more than eight years in accounting and management function for various organizations in the Logan, UT area.

Madi Roath – Project Coordinator Supervisor,
CPSI
Madi brings with her nine plus years of customer service and an associate in general science. Starting in 2021, she quickly moved from the receptionist position to Project Coordinator, and now works as the Project Coordinator Supervisor. She has had the opportunity to continually learn through quoting and designing projects for Great Western. With the supervisor position her role how now shifted to compliancy checking, training, and support for the sales and project coordinator teams. The biggest reward to Madi is being able to help provide safe and inclusive play areas for children of all ages.

Michaella Wood– Project Coordinator, CPSI
Michaella joined Great Western Recreation in 2021 and is a member of our Project Coordinator team. She has over five years of customer service and office experience. Michaella has proved essential to be a Project Coordinator and Designer.

Michaella is now a Certified Playground Safety Inspector (CPSI) and is a member of our team that checks for compliance on all playgrounds and is also an essential member of our design team. One of Michaella’s favorite thigs about designing playgrounds is seeing her designs come to life and seeing kids playing and learning on those playgrounds
David Hill – Western Regional
Manager/GameTime
David has over 17 years of experience in creating outdoor play environments and currently serves as the Western Regional and International Sales Manager for GameTime where he consults with various professionals on designing outdoor play environments that implement research-based best practices in design. He has designed dozens of inclusive play spaces as well as countless customer oriented play spaces that incorporate research based best practices. He has presentedPlayCore's research at a various state and regional conferences, including Kentucky, California, Idaho, Georgia, Washington, Alabama Trails and the Midwest Recreation and Parks Conferences. He is a Certified Executive Trainer of PlayCore.

David graduated from Pennsylvania State University with a MBA and from Humboldt State University with a B.S. in Business Administration.

CREATING

ENVIRONMENTS
PEOPLE
ENJOY®

SAN LUIS OBISPO (HQ)
3765 South Higuera St., Ste. 102
San Luis Obispo, CA 93401
p: (805) 543-1794

SAN DIEGO
310 3rd Avenue, Ste. C-26A
Chula Vista, CA 91910
p: (805) 456-8860

SAN JUAN CAPISTRANO
32332 Camino Capistrano, Ste. 205
San Juan Capistrano, CA 92675
p: (949) 361-7950

SAN LEANDRO
325 Davis St.

San Leandro, CA 94577
p: (510) 751-4910

SANTA BARBARA
10 East Figueroa St., Ste. 200
Santa Barbara, CA 93101
p: (805) 963-8283

VENTURA
422 East Main St.

Ventura, CA 93001
p: (805) 652-2115

WEBSITE
www.rrmdesign.com
RRM Design Group is a California
corporation and an employee-owned
company, incorporated November 26, 1974
FIRM PROFILE | RRM Design Group
RRM exists because we love creating environments people enjoy. That is what got us into the business over 45 years ago, and it is why we continue to thrive today. Our architects and landscape architects, engineers, surveyors, and planners work with our clients and their communities to create the parks our children play in, the roads we drive down on our way to work, the neighborhoods we come home to, and the fire stations that keep our communities safe.

Our work culture emphasizes collaboration, frequent communication, and accessibility. We're a close partner with our clients, helping them understand and navigate through the project lifecycle. Whether your project is public or private, commercial or residential, we listen, we design, and we deliver. On time. On budget. Since 1974.

PERSONNEL BY DISCIPLINE
195 professionals on staff at RRM Design Group in 6 core disciplines:

Architecture Landscape
Architecture
Support
Staff Planning
Civil Engineering
Surveying
Structural Engineering
33 California Licensed Architects
37 Architecture Designers
14 California Licensed Civil Engineers
3 California Licensed Structural Engineers
25 Engineering Designers
18 California Licensed Landscape Architects
14 Landscape Designers
17 Community & Urban Planners
1 Licensed Surveyor
3 Surveying Technicians
33 Administrative Support Staff
LIEF McKAY | ASLA, PLA LEED AP
With over 20 years of experience, Lief offers a creative and functional approach to design. Both his affinity for the outdoors and strong artistic sense foster high-quality landscape architecture. Committed to excellence, Lief approaches each project with open-minded collaboration and detailed design. From public outreach strategy and facilitation to construction document preparation, Lief is actively engaged in every part of the process. His projects span from urban plazas and green spaces to largescale regional parks and sports complexes specializing in recreational and urban design. Lief leads with a calm determination—driven to impact the client and community through accessible and enjoyable outdoor spaces.

RELEVANT PROJECTS
• Canyon Country Park Inclusive Play
Area, Santa Clarita
• Central Park, San Mateo
• Conejo Creek Southwest Park,
Thousand Oaks
• Greenwood Park Renovation,
Hayward
• Kennedy Park, Hayward
• Martial Cottle Park, San Jose
• Meadow Park Playground
Renovation, San Luis Obispo
• Mia’s Dream Come True
Playground, Hayward
• Olympus Park Design, Encinitas
• Gwendolyn’s Playground, Santa
Barbara
• Pleasant Oaks Park Playground,
Pleasant Hill
• Pleasanton All-Abilities Playground,
Pleasanton
• San Lorenzo Community Park
• San Pablo Park Improvements,
Berkeley
• Sinsheimer Park Playground,
San Luis Obispo
• Sunset Park Playground, Livermore
• Throop Park Playground
Renovation, San Luis Obispo
• Veterans Park, Brentwood
• William Payne Park, Livermore

EDUCATION
• Bachelor of Landscape
Architecture, Honors, University of
Canberra, Australia
ACCREDITATIONS •
LICENSES • AFFILIATIONS
• Professional Landscape Architect,
CA, 4937
• Leadership in Energy and
Environmental Design Accredited
Professional (LEED AP)
• American Society of Landscape
Architects (ASLA), Member,
2012-present
• Big Brothers/Big Sisters, Mentor,
2005-2010
• San Luis Obispo Botanical Garden,
Board Member, 2019-present
• San Luis Obispo Rugby Football
Club, President, 2000-2017

CREATING

ENVIRONMENTS
PEOPLE
ENJOY
Project Role

PRINCIPAL
Experience
23 YEARS OF

EXPERIENCE
CHRIS DUFOUR | PLA LEED AP
As Principal Landscape Architect, Chris brings a wealth of experience to the team at RRM. Specializing in large-scale irrigation projects and water conservation design, Chris’s technical expertise is an asset to each client he works with. His commitment to technological precision yields stunning results, from the Lindero Linear Park in Westlake Village to Surfer’s Point in Ventura. Beyond design, Chris is involved in several parts of the process, from document writing and cost estimates to construction administration and planning. Both his technical and administrative skills make him one of RRM’s trusted landscape architects.

RELEVANT PROJECTS
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park, Wildomar
• Central Park Master Plan Update,
San Mateo
• City Heritage Park, Parlier
• Conejo Creek Southwest Park -
Paige Lane Neighborhood Park,
Thousand Oak
• Downey Measure S Park
Improvement Projects
• Greenwood Park Renovation,
Hayward
• Greystone Neighborhood Park,
Bakersfield
• Ken Mercer Sports Park Skate
Park, Pleasanton
• Lindero Linear Park, Westlake
Village
• Mia’s Dream Come True
Playground, Hayward
• Olympus Park Design, Encinitas
• Ortega Park, Santa Barbara
• Righetti Ranch Neighborhood Park,
San Luis Obispo
• San Lorenzo Community Park
• Sapwi Trails Community Park,
Thousand Oaks
• Veterans Park, Brentwood

EDUCATION
• Bachelor of Science, Landscape
Architecture, California Polytechnic
State University, San Luis Obispo, CA
ACCREDITATIONS •
LICENSES • AFFILIATIONS
• Professional Landscape Architect,
CA, 4993
• Leadership in Energy and
Environmental Design Accredited
Professional (LEED AP)

CREATING

ENVIRONMENTS
PEOPLE
ENJOY
Project Role

PRINCIPAL

LANDSCAPE

ARCHITECT
Experience
24 YEARS OF

EXPERIENCE
MARISA PELTIER | PLA, CPSI
Marisa is the lead designer of RRM’s most noteworthy playgrounds, including Mia’s Dream Come True in Hayward. As a RRM Design Director, she combines exceptional design quality with an acute understanding of the psychology of play to create unique spaces that provide critical play value to children of all abilities. As a certified playground safety inspector, Marisa is equipped with the knowledge to ensure all designs are secure and functional. Additionally, she has extensive experience working on construction drawings from concept through construction. Marisa designs with the core belief that inclusive play opportunities are imperative for healthy communities striving to meet social justice and accessibility goals.

RELEVANT PROJECTS
• Biddle Park Master Plan,
Arroyo Grande
• Canyon Country Park Inclusive Play
Area, Santa Clarita
• Chumash Park Master Plan,
Simi Valley
• Clarke Ranch Park Master Plan,
American Canyon
• Fairmont Terrace Park Master Plan,
Hayward
• Greenwood Park Renovation,
Hayward
• Heritage Square Park, Arroyo
Grande
• Kennedy Park Master Plan,
Hayward
• Martial Cottle Park Site Plan,
San Jose
• Meadow Park Playground
Renovation, San Luis Obispo
• Mia’s Dream Come True
Playground, Hayward
• Dwight Murphy and Gwendolyn’s
Playground Field Design Services,
Santa Barbara
• Pleasanton All-Abilities Playground,
Pleasanton
Pleasanton Staples Ranch Park,
Pleasanton
• Ramona Garden Park Master Plan
(CIP), Grover Beach
• Rivendale Park Master Plan,
Santa Clarita
• San Felipe Park Master Plan,
Hayward
• San Lorenzo Community Park
Master Plan, San Lorenzo
• Sinsheimer Park Playground,
San Luis Obispo
• Via Toledo Neighborhood Park
Master Plan, Hayward
• Waller Park Master Plan, Orcutt

EDUCATION
• Bachelor of Landscape Architecture,
California Polytechnic State
University, San Luis Obispo, CA
ACCREDITATIONS •
LICENSES • AFFILIATIONS
• Professional Landscape Architect,
CA, 6432
• Certified Playground Safety
Inspector, CA, 50557-0324

CREATING

ENVIRONMENTS
PEOPLE
ENJOY
Project Role

DESIGN DIRECTOR
Experience
16 YEARS OF

EXPERIENCE
AMANDA SEIBEL | PLA, LEED AP
For 20 years, Amanda has been transforming outdoor spaces into masterful products of design. With a keen artistic vision and design sense, Amanda offers a unique lens to landscape architecture. Her ability to refine concepts into detailed project completion serves as an asset to all who work with her. True artistry and compassion guide her design process, from idea through implementation. Specializing in park and recreational design, Amanda brings her talent to every project she is involved in. Incorporating the creative vision of both her client and her team of fellow designers, Amanda is committed to enhancing natural spaces for the benefit of all individuals.

RELEVANT PROJECTS
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park, Wildomar
• Central Park Master Plan Update,
San Mateo
• City Heritage Park, Parlier
• Contra Loma Estates Park
Renovation, Antioch
• Downey Measure S Park
Improvement Projects
• Greenwood Park Renovation,
Hayward,
• Kennedy Park Master Plan,
Hayward
• La Mirada Creek Park Master Pla
• La Palma Park Expansion and
Renovation, Anaheim
• Morro Creek Multi-Use Trail and
Bridge, Morro Bay, CA
• Olympus Park Design, Encinitas
• Ortega Park Preliminary Design,
Santa Barbara
• Pleasant Oaks Park Playground
Concept, Pleasant Hill
• Righetti Ranch Neighborhood Park,
San Luis Obisp
• San Lorenzo Community Park
• Via Toledo Neighborhood Park
Master Plan, Hayward
• Zumwalt Park Conceptual Design,
Tulare

EDUCATION
• Bachelor of Landscape Architecture,
Visual Expression, California
Polytechnic State University, San
Luis Obispo, CA
ACCREDITATIONS •
LICENSES • AFFILIATIONS
• Professional Landscape Architect,
CA, 6504
• Leadership in Energy and
Environmental Design Accredited
Professional (LEED AP)
• Surfrider Foundation, Member,
2013-present

CREATING

ENVIRONMENTS
PEOPLE
ENJOY
Project Role

DESIGN DIRECTOR
Experience
20 YEARS OF

EXPERIENCE
MIKE HAMILTON | PE, QSD/P
Mike is an RRM principal and the manager of engineering for the Santa Barbara office. He brings over 20 years of experience in both the public and private sectors, and has worked diligently with municipalities, developers, architects, and institutions to bring many successful projects to completion. At RRM, he is involved in the mentorship program and is also the principal of the sustainability committee. Mike is a leader in the ever-changing field of stormwater management, specializing in designing and implementing Best Management Practices, wastewater management, and land development.

RELEVANT PROJECTS
• Alex Fiore Teen Center and
Goebel Adult Center Master Plan,
Thousand Oaks
• Conejo Creek Southwest Park -
Paige Lane Neighborhood Park,
Thousand Oaks
• Hollister Avenue Complete Streets
Corridor Plan, Goleta
• Ortega Park and Dwight
Murphy Field Design Services (+
Gwendolyn’s Playground), Santa
Barbara
• Ortega Park Preliminary Design,
Santa Barbara
• Paso Robles Joint Unified School
District Athletic Fields
• Paso Robles Joint Unified School
District Athletic Fields
• Paso Robles Joint Unified
School District DROPS Grant
Implementation
• Patterson Avenue Road
Improvements, Goleta,
• Providence School - Civil
Engineering Services, Santa
Barbara
• Santa Susana High School
Landscape Frontage Improvements,
Simi Valley
• Sunset Park Playground, Livermore
• Thompson Park Grading Plan,
Lompoc

EDUCATION
• Bachelor of Science, Civil Engineering,
California Polytechnic State
University, San Luis Obispo, CA
ACCREDITATIONS •
LICENSES • AFFILIATIONS
• Professional Engineer, CA, 62696
• California Certified Qualified
Stormwater Pollution Prevention
Plan Developer/Practitioner
(QSD/P)
• American Council of Engineering
Companies (ACEC) Channel Coast
Chapter - Current Board Officer
(Vice President)
• American Society of Civil Engineers
(ASCE)
• American Public Works Association
(APWA)
• Leadership Santa Barbara County
(LSBC)

CREATING

ENVIRONMENTS
PEOPLE
ENJOY
Project Role
PRINCIPAL +

CIVIL ENGINEER
Experience
26 YEARS OF

EXPERIENCE
MICHAEL DOREMUS | SE, PE, LEED AP
With over a decade of civil and structural engineering experience, Michael’s approach to design is steeped in a commitment to detailed precision. Michael offers his extensive expertise for each client, specializing in housing, civil, educational, and recreational design. He has been involved in projects of all sizes, from large-scale steel frame hospitals to 43,000 sq. ft. laboratories. Also overseeing the design and code compliance for lateral and gravity systems, Michael is well-versed in a range of project types. His thorough approach to design and a keen eye for detail translates into procedural and structural integrity.

RELEVANT PROJECTS
• Alex Fiore Teen Center and Goebel
Adult Center Master Plan,
Thousand Oaks
• Columbus Park Soccer Facility
Design, San Jose
• Conejo Creek Southwest Park - Paige
Lane Neighborhood Park,
Thousand Oaks
• Downey Measure S Park
Improvement Projects
• Dublin Sports Grounds Master Plan
• Fairmont Terrace Park Construction
Documents, Hayward
• Grove Park Field and Playground
Renovations Design Services,
Berkeley
• La Mirada Creek Park Master Pla
• Livermore Downtown Core
Landscape Concept and Stockmen’s
Park
• Mia’s Dream Come True Playground,
Hayward
• Olympus Park Design, Encinitas
• Paso Robles Joint Unified School
District Athletic Fields
• San Pablo Park Improvements,
Berkeley
• Sapwi Trails Community Park,
Thousand Oaks
• Sinsheimer Park Playground,
San Luis Obispo
• War Memorial Stadium Paso Robles
Construction Staking, Paso Robles

EDUCATION
• Bachelor of Science, Architectural
Engineering, California Polytechnic
State University, San Luis Obispo, CA
ACCREDITATIONS • LICENSES
• AFFILIATIONS
• Professional Engineer, CA, 62696
• California Certified Qualified
Stormwater Pollution Prevention Plan
Developer/Practitioner (QSD/P)
• American Council of Engineering
Companies (ACEC) Channel Coast
Chapter - Current Board Officer
(Vice President)
• American Society of Civil Engineers
(ASCE)
• American Public Works Association
(APWA)
• Leadership Santa Barbara County
(LSBC)

CREATING

ENVIRONMENTS
PEOPLE
ENJOY
Project Role

MANAGER OF

STRUCTURAL

ENGINEERING
Experience
19 YEARS OF

EXPERIENCE
Equipment Examples and Pricing Estimates
https://gametime.app.box.com/s/cqf7bdno7nxbciiv40a7c0des7hocyzk Willow Park-Angels Landing
Logan City
Logan, UT
Contact: Reed Bytendrop, 435-716-9635, [email protected] Estimated Equipment Cost: $369,000
Estimated Installation Cost: $92,700
Estimated EWF Cost: $12,770
Estimated PIP Cost: $84,600
Estimated Turf Cost: $94,000
Estimated Tile Cost: $103,400
Beattie Park
City of Lompoc
Lompoc, CA
Contact: Mario Guerrero, 805-736-5195, [email protected] Estimated Equipment Cost: $417,000
Estimated Installation Cost: $122,900
Estimated EWF Cost: $18,435
Estimated PIP Cost: $122,130
Estimated Turf Cost: $135,700
Estimated Tile Cost: $149,270
Canyon Country Park
City of Santa Clarita
Santa Clarita, CA
Contact: Jeff Morrison, 661-510-2074, [email protected] Estimated Equipment Cost: $740,000
Estimated Installation Cost: $216,800
Estimated EWF Cost: $11,415
Estimated PIP Cost: $75,600
Estimated Turf Cost: $84,000
Estimated Tile Cost: $92,400
Lakewood Playground
City of Seattle
Seattle, WA
Contact: Len Sundstrom, 206-730-8901, [email protected] Estimated Equipment Cost: $111,000
Estimated Installation Cost: $32,200
Estimated EWF Cost: $6,100
Estimated PIP Cost: $40,320
Estimated Turf Cost: $44,800
Estimated Tile Cost: $49,280
Mammoth Creek Park
Town of Mammoth Lakes
Mammoth Lakes, CA
Contact: Stuart Brown, 760-965-3696, [email protected] Estimated Equipment Cost: $345,000
Estimated Installation Cost: $102,000
Estimated EWF Cost: $21,115
Estimated PIP Cost: $139,860
Estimated Turf Cost: $155,400
Estimated Tile Cost: $170,940
Schultz Ranch Park
Carson City
Carson City, NV
Contact: Adam Rutheford, 775-425-4000, [email protected]
Estimated Equipment Cost: $231,000
Estimated Installation Cost: $68,000
Estimated EWF Cost: $10,395
Estimated PIP Cost: $68,850
Estimated Turf Cost: $76,500
Estimated Tile Cost: $84,150
Ten Mile Christian Church Playground
Ten Mile Christian Church
Meridian, ID
Contact: Mandy Murphy, 208-888-3101, [email protected] Estimated Equipment Cost: $146,000
Estimated Installation Cost: $42,700
Estimated EWF Cost: $14,265
Estimated PIP Cost: $94,500
Estimated Turf Cost: $105,000
Estimated Tile Cost: $115,500
Windermere Park
Bakersfield City
Bakersfield, CA
Contact: Fidel Gonzales, 661-326-3268, [email protected] Estimated Equipment Cost: $168,000
Estimated Installation Cost: $50,000
Estimated EWF Cost: $5,900
Estimated PIP Cost: $39,060
Estimated Turf Cost: $43,400
Estimated Tile Cost: $47,740
Fern Dell Park
City of Los Angeles
Los Angeles, CA
Contact: Mel Raiford, 213-847-0934, [email protected] Estimated Equipment Cost: $402,000
Estimated Installation Cost: $137,500
Estimated EWF Cost: $8,510
Estimated PIP Cost: $56,340
Estimated Turf Cost: $62,600
Estimated Tile Cost: $68,860
Columbia Community Park
Kennewick Parks & Recreation
Kennewick, WA
Contact: Greg Duffy, 509-585-4522, [email protected] Estimated Equipment Cost: $875,000
Estimated Installation Cost: $260,500
Estimated EWF Cost: $24,453
Estimated PIP Cost: $162,000
Estimated Turf Cost: $180,000
Estimated Tile Cost: $198,000

OUR COMMITMENT TO ENVIRONMENTAL SUSTAINABILITY
A GOOD PLANET IS HARD TO FIND.

IT’S OUR

RESPONSIBILITY TO

ACT AS STEWARDS OF

OUR PLANET AND ITS
NATURAL RESOURCES.

It’s also our mission to create
fun, active, and innovative places
for families to gather and play.

Our environmental sustainability
efforts are intended to help ensure
children of today can take their
grandchildren to playgrounds
in the future. Our approach to
stewardship and sustainability
encompasses every aspect of
our company - from the way we
manufacture our products to how
we do business.

Children learn many valuable
life skills on playgrounds. We’ve
learned some important lessons,
too. We continuously strive to be
environmentally responsible and
to make sure future generations
benefit from our efforts.

OUR PLAYGROUNDS ARE

DESIGNED FOR FAMILIES AND

TO MINIMIZE THE IMPACT ON
THE PLANET WHERE WE PLAY.

125,000 INDIVIDUAL PARTS.
400,000 SQUARE FEET.

ONE ENVIRONMENTAL COMMITMENT.

ENVIRONMENTALLY

FRIENDLY PLAYGROUNDS
With more than 125,000 individual
parts moving through our 400,000
square foot manufacturing facility,
even the smallest steps towards
greater environmental efficiency
can help us make a very big
difference.

WE PROTECT AND

MAKE EFFICIENT USE

OF OUR RESOURCES
GameTime products use some
of the world’s most durable and
recyclable materials, including
aluminum, plastic, stainless steel,
and steel. Our playgrounds are
sustainable and built to last
decades, not years. The materials
we use have the lowest possible
impact on the environment and are
strong enough to withstand the
physical demands of playful, active
families through years of changing
weather conditions.

RESPONSIBLE

SOURCING
We work with our suppliers to
source the most environmentally
preferable materials for our
products. When possible, we make
every effort to find opportunities to
work with vendors and suppliers in
our local communities to minimize
the carbon output associated with
transporting materials.

gametime.com 800.235.2440

WARRANTY
GameTime offers a comprehensive warranty on all of our products.

For the purpose of this warranty, “lifetime” encompasses no specific term of years, but rather that the Seller warrants to its original customer for as long as the original customer owns the product, and uses the product for its intended purpose, that the product and all its parts will be free from defects in material and manufacturing workmanship.
• Lifetime limited warranty on PowerScape®, PrimeTime®, Xscape® & IONiX® and Modern City® uprights. • Lifetime limited warranty on Tru-Loc® connections and upright bolt-through connections. • Lifetime limited warranty on all hardware.
• Twenty-Year limited warranty on Timber Décor & Timbers recycled plastic lumber. • Fifteen-Year limited warranty on metal decks, pipes, rungs, rails, loops, braces, and footbucks. • Fifteen-Year limited warranty on rotationally-molded products. • Fifteen-Year limited warranty on VistaRopeTM nylon bearings and ring junction pieces. • Ten-Year limited warranty on GTFit®, THRIVE® and Challenge Course posts & bars. • Ten-Year limited warranty on site furnishings against structural failure. • Ten-Year limited warranty on SunBlox products.
• Ten-Year limited warranty on fiberglass and DHPL signage. • Ten-Year limited warranty on VistaRopeTM WeaveTechTM cables. • Five-Year limited warranty on Tuff Forms® structures, including TuffCrete and PolyShield. • Five-Year limited warranty on nylon-covered cable net climbers and components. • Five-Year limited warranty on GT Symphony FreenotesTM Harmony Park components. • Five-Year limited warranty on Super Seats.
• Five-Year limited warranty on premature wear of VistaRope cables. • Three-Year limited warranty on EveryBODY Plays® polyurea coated foam & rubber strips. • Three-Year limited warranty on SaddleMates rubber and “C”-springs. • Three-Year limited warranty on rubber seat and rubber mats for net events. • One-Year limited warranty on Challenge Course timing components. • One-Year limited warranty on all other GameTime products.

TO THE EXTENT PERMITTED BY LAW, THESE WARRANTIES ARE EXPRESSLY IN LIEU OF ANY OTHER

IMPLIED OR EXPRESSED WARRANTIES OR REPRESENTATIONS BY ANY PERSON, INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS. Warranties do not cover damage caused by vandalism or abuse. Warranty claims must be filed within the applicable warranty period and accompanied by a copy of the original invoice or GameTime invoice number.
2025 PALETTE COLOR SELECTION
PROJECT:

ARLINGTON
Fabric Shade—Navy Blue
Plastic Roof—Red
Basic—Sky Blue
Accent—Skey Blue
HDPE—Dolphin Gray
2 Color HDPE—Gray/Black
Roto Plastic—Red
Tube—Red
Rock—Deep Granite
Decks—Blue
AURORA
Fabric Shade—Bottle Green
Plastic Roof—Azure
Basic—Ice Butter
Accent—Champagne
HDPE—Dolphin Gray
2 Color HDPE—Gray/Black
Roto Plastic—Azure
Tube—Azure
Rock—Deep Granite
Decks—Gray

BACKYARD
Fabric Shade—Turquoise
Plastic Roof—Azure
Basic—Butterscotch
Accent—Sea Mist
HDPE—Yellow
2 Color HDPE—Yellow/Black
Roto Plastic—Chartreuse
Tube—Chartreuse
Rock—Deep Granite
Decks—Brown

BAY VIEW
Fabric Shade—Bottle Green
Plastic Roof—Azure
Basic—Ice Mint
Accent—Ocean
HDPE—Dolphin Gray
2 Color HDPE—Gray/Black
Roto Plastic—Azure
Tube—Azure
Rock—Deep Granite
Decks—Blue

BEE HIVE
Fabric Shade—Silver
Plastic Roof—Yellow
Basic—Black
Accent—Ice Butter
HDPE—Dolphin Gray
2 Color HDPE—Gray/Black
Roto Plastic—Yellow
Tube—Yellow
Rock—Deep Granite
Decks—Brown

BLOOM BAY
Fabric Shade—Lime
Plastic Roof—Spring Green
Basic—Champagne
Accent—Spring Green
HDPE—Sky Blue
2 Color HDPE—Sky Blue/White
Roto Plastic—Sky Blue
Tube—Spring Green
Rock—Deep Granite
Decks—Brown

BLUEBELL
Fabric Shade—True Blue
Plastic Roof—Blue
Basic—Ice Butter
Accent—Sea Mist
HDPE—Azure
2 Color HDPE—Azure/White
Roto Plastic—Blue
Tube—Blue
Rock—Deep Granite
Decks—Blue

DEEP SPACE
Fabric Shade—Dove Blue
Plastic Roof—Sky Blue
Basic—Starlight Black
Accent—Yellow
HDPE—Red
2 Color HDPE—Red/White
Roto Plastic—Sky Blue
Tube—Sky Blue
Rock—Deep Granite
Decks—Blue

EMERALD
Fabric Shade—Navy Blue
Plastic Roof—Spring Green
Basic—Metallic
Accent—White
HDPE—Yellow
2 Color HDPE—Red/White
Roto Plastic—Spring Green
Tube—Spring Green
Rock—Deep Granite
Decks—Blue

FORESTER
Fabric Shade—Forest Green
Plastic Roof—Green
Basic—Brown
Accent—Beige
HDPE—Beige
2 Color HDPE—Beige/Green
Roto Plastic—Green
Tube—Green
Rock—Deep Granite
Decks—Brown

FOXGLOVE
Fabric Shade—Turquoise
Plastic Roof—Azure
Basic—Royal Purple
Accent—Ice Mint
HDPE—Purple
2 Color HDPE—Spring Green/White
Roto Plastic—Chartreuse
Tube—Chartreuse
Rock—Deep Granite
Decks—Blue
GECKO
Fabric Shade—Lime
Plastic Roof—Spring Green
Basic—Vanilla
Accent—Beige
HDPE—Spring Green
2 Color HDPE—Spring Green/White
Roto Plastic—Green
Tube—Green
Rock—Deep Granite
Decks—Chocolate

GUM DROP
Fabric Shade—Navy Blue
Plastic Roof—Blue
Basic—Burgundy
Accent—Butterscotch
HDPE—Blue
2 Color HDPE—Red/White
Roto Plastic—Blue
Tube—Blue
Rock—Deep Granite
Decks—Blue

HONEYSUCKLE
Fabric Shade—Silver
Plastic Roof—Perwinkle
Basic—Spring Green
Accent—Champagne
HDPE—Blue
2 Color HDPE—Spring Green/White
Roto Plastic—Perwinkle
Tube—Perwinkle
Rock—Deep Granite
Decks—Gray

IMAGINATION
Fabric Shade—Orange
Plastic Roof—Azure
Basic—Perwinkle
Accent—Butterscotch
HDPE—Dolphin Gray
2 Color HDPE—Gray/Black
Roto Plastic—Azure
Tube—Azure
Rock—Deep Granite
Decks—Gray

INDEPENDENCE
Fabric Shade—Navy Blue
Plastic Roof—Champagne
Basic—Burgundy
Accent—White
HDPE—Blue
2 Color HDPE—Blue/White
Roto Plastic—Champagne
Tube—Champagne
Rock—Deep Granite
Decks—Blue
JOYFUL
Fabric Shade—Navy Blue
Plastic Roof—Spring Green
Basic—Burgundy
Accent—Butterscotch
HDPE—Blue
2 Color HDPE—Blue/White
Roto Plastic—Spring Green
Tube—Spring Green
Rock—Deep Granite
Decks—Blue

JURASSIC
Fabric Shade—Sun Blaze
Plastic Roof—Champagne
Basic—Sage
Accent—Butterscotch
HDPE—Dolphin Gray
2 Color HDPE—Burgundy/White
Roto Plastic—Champagne
Tube—Champagne
Rock—Sandstone
Deck—Brown
LAGOON
Fabric Shade—Lime
Plastic Roof—Chartreuse
Basic—Ocean
Accent—Ice Mint
HDPE—Sky Blue
2 Color HDPE—Sky Blue/White
Roto Plastic—Chartreuse
Tube—Chartreuse
Rock—Deep Granite
Decks—Blue

LEMONADE
Fabric Shade—Yellow
Plastic Roof—Azure
Basic—Vanilla
Accent—Ocean
HDPE—Azure
2 Color HDPE—Azure/White
Roto Plastic—Yellow
Tube—Yellow
Rock—Deep Granite
Decks—Blue
MACAW
Fabric Shade—Yellow
Plastic Roof—Yellow
Basic—Orange
Accent—Chartreuse
HDPE—Sky Blue
2 Color HDPE—Sky Blue/White
Roto Plastic—Red
Tube—Red
Rock—Deep Granite
Decks—Blue
MALIBU
Fabric Shade—Forest Green
Plastic Roof—Spring Green
Basic—Bronze
Accent—Beige
HDPE—Spring Green
2 Color HDPE—Spring Green/White
Roto Plastic—Spring Green
Tube—Spring Green
Rock—Sandstone
Decks—Brown

OCEANSCAPE
Fabric Shade—True Blue
Plastic Roof—Azure
Basic—Chartreuse
Accent—Royal Purple
HDPE—Dolphin Gray
2 Color HDPE—Spring Green/White
Roto Plastic—Azure
Tube—Azure
Rock—Deep Granite
Decks—Brown

OLD DOMINION
Fabric Shade—Deep Ochre
Plastic Roof—Burgundy
Basic—Ocean
Accent—Champagne
HDPE—Blue
2 Color HDPE—Gray/Black
Roto Plastic—Burgundy
Tube—Burgundy
Rock— Deep Granite
Decks—Gray

ROCK MOSS
Fabric Shade—Silver
Plastic Roof—Chartreuse
Basic—Metallic
Accent—Beige
HDPE—Brown
2 Color HDPE—Beige/Green
Roto Plastic—Chartreuse
Tube—Chartreuse
Rock— Deep Granite
Decks—Brown

ROLLING WAVE
Fabric Shade—True Blue
Plastic Roof—Sky Blue
Basic—Sky Blue
Accent—Azure
HDPE—Orange
2 Color HDPE—Orange/White
Roto Plastic—Sky Blue
Tube—Sky Blue
Rock— Deep Granite
Decks—Blue
SHINE
Fabric Shade—True Blue
Plastic Roof—Orange
Basic—Sky Blue
Accent—Spring Green
HDPE—Orange
2 Color HDPE—Spring Green/White
Roto Plastic—Orange
Tube—Orange
Rock—Sandstone
Decks—Gray

SUCCULENT
Fabric Shade—Forest Green
Plastic Roof—Spring Green
Basic—Black
Accent—Vanilla
HDPE—Black
2 Color HDPE—Black/White
Roto Plastic—Spring Green
Tube—Spring Green
Rock— Deep Granite
Decks—Gray

SUMMER SLICE
Fabric Shade—Lime
Plastic Roof—Red
Basic—White
Accent—Chartreuse
HDPE—Green
2 Color HDPE—Spring Green/White
Roto Plastic—Spring Green
Tube—Red
Rock—Deep Granit Decks—Blue

TIMBERLAND
Fabric Shade—True Blue
Plastic Roof—Sky Blue
Basic—Brown
Accent—Spring Green
HDPE—Sky Blue
2 Color HDPE—Sky Blue/White
Roto Plastic—Sky Blue
Tube—Sky Blue
Rock— Deep Granite
Decks—Blue
TURTLE
Fabric Shade—Cedar
Plastic Roof—Brown
Basic—Chartreuse
Accent—Sea Mist
HDPE—Dolphin Gray
2 Color HDPE—Azure/White
Roto Plastic—Brown
Tube—Brown
Rock— Deep Granite
Decks—Chocolate
VERANO
Fabric Shade—Turquoise
Plastic Roof—Azure
Basic—Ocean
Accent—Vanilla
HDPE—Azure
2 Color HDPE—Azure/White
Roto Plastic—Spring Green
Tube—Spring Green
Rock— Deep Granite
Decks—Bluw

WEST PALM
Fabric Shade—Lime
Plastic Roof—Orange
Basic—Sky Blue
Accent—Spring Green
HDPE—Blue
2 Color HDPE—Spring Green/White
Roto Plastic—Orange
Tube—Orange
Rock— Sandstone Decks—Gray

WHIMSY WAY
Fabric Shade—Navy Blue
Plastic Roof—Orange
Basic—White
Accent—Blue
HDPE—Orange
2 Color HDPE—Spring Green/White
Roto Plastic—Periwinkle
Tube—Sky Blue
Rock— Deep Granite
Decks—Gray

WOODLANDS
Fabric Shade—True Blue
Plastic Roof—Spring Green
Basic—Bronze
Accent—Vanilla
HDPE—Blue
2 Color HDPE—Blue/White
Roto Plastic—Spring Green
Tube—Spring Green
Rock— Deep Granite
Decks—Chocolate