PROPOSAL 250806 R.F.C/O 1
To: Cassidy Skelton
City of Santa Clarita
Date: November 12, 2025
Project: City Hall Valenica
We propose to furnish all necessary labor, material, equipment, supervision, and insurance to complete the following work at the above address:
SECTION 07 9200
AREA: window flange to brick double joint repair
Scope of Work – Sealant
1. Remove existing new joints from the window to brick and at brick to brick,
2. Install backer rod and caulk as per contract
3. Added scope per Tremco due to wrong installation during construction of building
4. New detail Install bond breaker tape with second sealant joint not per contract
5. Materials $15,230
6. Swing Stage rental $8,040
7. Labor to move stages and reseal with double joint $51,500
Scope of Work: Window 1
1. Caution off area
2. AWR to provide lift for removal & replacement of window, plus a ground man
3. Remove cracked window size 44 ¾by 94 inches, ¼ of a inch thick, and install #2-743 polish ¼ double coat opaci $9,804
Scope of Work Window 2
1. Caution off area
2. AWR to provide lift for removal and replacement of window. Plus, a ground man
3. Remove cracked window 44 by 60 a ¼ of a inch thick and replace with a ¼inch 44 by 60 clear glass, tint to be applied later. $7,983
Price __________________________________________________________________$ 92,557
STANDARD NOTES:
a. Angelus Waterproofing & Restoration Inc. is a certified SBE company and is signatory to Cement Masons, Water Proofers, UNIONS.
b. Insurance Coverage Carried: One Million Dollars General Liability and Automobile Liability excluding XCU.
Contracts under $10,000.00 will not be issued additional insured endorsements. c. Performance and Payment Bonds are not included in the Total Price. d. Permits and Inspections are not included.
e. All work to be performed as per manufacturers’ specifications and recommendations. f. Waiver of Subrogation Endorsement is not included in Total Price, if required; please contact us before execution of authorization.
g. 5 days advance notice prior to commencing work.
h. All items not included in scope of work are specifically excluded. i. Payment is based on Net 30 Days or subject to late charge of 1½% per month.
TERMS:
This proposal is subject to review if not accepted within 30 days from above date and is contingent upon strikes, fires, accidents, labor or material price increases or any other causes beyond our control.
ACCEPTED BY RESPECTFULLY SUBMITTED, ANGELUS WATERPROOFING AND RESTORATION, INC.
BY DATE BY __ Authorized Representative Richard O’Hehir, Angelus Waterproofing
October 16, 2025.
To: Richard O’Hehir
Angelus Waterproofing and Restoration, Inc.
17762 Metzler Ln, Huntington Beach, CA 92647.
[email protected]
Project: City Hall & Valencia Library.
Re: Window perimeter reseal.
It was found that the original sealant that was installed had not filled the joint for proper adhesion only adhering to the building substrate and -1/8” of the window frame (the joint was observed to create an L shape). Tremco recommends installing 2 joints/beads, one to fill the void behind the metal and a second to properly seal the window perimeter.
To Whom It May Concern,
If there are any questions or additional information is needed, please feel free to contact me directly.
Sincerely,
Jason Bashford
Jason Bashford
Technical Sales Representative SoCal
Tremco Sealants & Waterproofing
[email protected]
216 218 9436
17762 Metzler Ln, Huntington Beach., CA 92647 - Phone (562) 941-7676 - Fax (562) 941-1166
1/4" MIN.DEPTH
FLANGED WINDOW (BY OTHERS)
(E)BRICK FACADE(BY OTHERS)
NOTE: SUBSTRATE SHALL BE CLEAN DRY AND UNCONTAMINATED PRIOR TO APPLICATIONNOTE: AN ADHESION TEST IS RECOMMENDED TO DETERMINE IF PRIMER IS REQUIRED.
SPECTREM 1 SILICONE(SECONDARY JOINT,APPLIED AFTER PRIMARYBEAD IS FULLY CURED)
CLOSED CELLBACKER ROD
SPECTREM 1 SILICONE(PRIMARY BEAD)
3735 Green Road * Beachwood, OH 44122Sheet Number:Scale:Date:Drawn by:www.tremcosealants.comProject:VALENCIA CITY HALLJM NoneDetail:SEALANT TO EXISTING WINDOW HEADFile Name:00Checked by:XXXPhone : 866-209-2404 * Fax: 216-766-5535 R Rev #This detail is intended for conceptual purposes only.10/27/2025EX WSJ 2025 10 27