Toro Bid Scheulde
Item No Code * Description * Quantity UOM Unit Rate Total 1 0100310003 CONSTRUCTION SURVEY 1 Lump-Sum $55,000.00 $55,000.00 2 0100312003 PREPARATION OF THE BMP PLAN 1 Lump-Sum $5,250.00 $5,250.00 3 0100312005WATER POLLUTION CONTROL, IMPLEMENTATION AND MAINTENANCE OF BMP’S 1 Lump-Sum $54,600.00 $54,600.00
4 0100703003MOBILIZATION/DEMOBILIZATION 1 Lump-Sum $580,000.00 $580,000.00 5 0330001003 CLEARING AND GRUBBING 4,070 Square Foot/Feet $2.80 $11,396.00 6 0330001004 REMOVE AND DISPOSE OF ASPHALT TAILINGS (ALLOWANCE) 423 Cubic Yard $39.15 $16,560.45 7 0330001021LANDSCAPE AND IRRIGATION REMOVAL 4,067 Square Foot/Feet $0.75 $3,050.25 8 0330002003 UNCLASSIFIED EXCAVATION 640 Cubic Yard $96.90 $62,016.00 9 N/A EXPORT 190 Cubic Yard $31.55 $5,994.50
10 N/A SOIL REMOVAL FOR MEDIAN PLANTERS (30" FROM TOP OF ASPHALT DEPTH X NEW PLANTING AREA 625 Cubic Yard $37.95 $23,718.75 11 N/A CLASS 'A' SOIL IMPORT FOR MEDIAN PLANTERS (33" DEPTH X NEW PLANTING AREA) 1,717 Cubic Yard $51.80 $88,940.60
12 0330004003 UNCLASSIFIED FILL 450 Cubic Yard $43.20 $19,440.00 13 0330011003 RIPRAP 10 Cubic Yard $538.00 $5,380.00
14 0330102005CLASS II AGGREGATE BASE 2,820 Cubic Yard $75.65 $213,333.00 15 0330205003 1/2" TYPE A HMA PG 64-10 1,600 Ton $149.95 $239,920.00 16 0330205004 1/2" TYPE A HMA PG 64-10 (BASE COURSE) (ON EDISON PROPERTY)41 Ton $208.30 $8,540.30 17 03302050051/2"TYPEAHMAPG64-10(FINISHCOURSEINAREASOUTSIDEOFTHE OVERLAY) 25 Ton $207.05 $5,176.25
18 03302050061/2"TYPEAHMAPG64-10(FINISHCOURSEINAREASOUTSIDEOFTHE OVERLAY)(ON EDISON PROPERTY) 27 Ton $207.40 $5,599.80
19 0330205007 3/8" TYPE A HMA PG 64-10 3,988 Ton $164.00 $654,032.00 20 0330205018REDWOOD HEADER 122 Linear Foot/Feet $20.00 $2,440.00 21 0330205019REDWOOD HEADER (ON EDISON PROPERTY) 105 Linear Foot/Feet $20.00 $2,100.00 22 0330209003 1/2" RHMA TYPE G PG 64-16 8,201 Ton $154.00 $1,262,954.00 23 0330301123PARKWAY DRAIN PER SPPWC STD PLAN 151, S=24", INLET TYPE 2 5 Each $8,288.00 $41,440.00 24 0330301130HEADWALL (CALTRANS STD PLAN D90) 18 Linear Foot/Feet $1,977.00 $35,586.00 25 N/A CONCRETE FLUME 17 Each $1,570.00 $26,690.00
26 0330305003 CONCRETE CURB, TYPE A1-6 150 Linear Foot/Feet $40.85 $6,127.50 27 0330305045CONCRETE CURB & GUTTER, TYPE A2-6 1,220 Linear Foot/Feet $41.60 $50,752.00 28 0330305047CONCRETE CURB & GUTTER, TYPE A2-8 3,050 Linear Foot/Feet $43.45 $132,522.50 29 0330305053CONCRETE CURB & GUTTER, TYPE A3-6 3,760 Linear Foot/Feet $39.10 $147,016.00 30 0330305055CONCRETE CURB & GUTTER, TYPE A3-8 1,210 Linear Foot/Feet $44.75 $54,147.50 31 03303050621" CURB & 24" GUTTER (SPPWC 121-3) 110 Linear Foot/Feet $54.05 $5,945.50 32 0330305075CONCRETE WALK, 4" THICK 8,550 Square Foot/Feet $6.35 $54,292.50 33 0330305083CONCRETE DRIVEWAYS, 6" THICK, 4000 PSI (HIGH EARLY STRENGTH)2,926 Square Foot/Feet $13.90 $40,671.40 34 0330305087STAMPED & COLORED CONCRETE, 6" THICK 585 Square Foot/Feet $20.40 $11,934.00 35 0330305091CONCRETE CURB RAMPS 5 Each $2,875.00 $14,375.00 36 0330305093DETECTABLE WARNING SURFACE 7 Each $687.00 $4,809.00 37 0330406003REMOVE AND DISPOSE OF EXISTING GUARDRAIL (INCLUDING POSTS) 670 Linear Foot/Feet $18.50 $12,395.00 38 0330406005 REMOVE AND DISPOSE OFEXISTING GUARDRAILEND TREATMENTAND CONCRETE FOOTING (INCLUDING POSTS) 2 Each $1,969.00 $3,938.00 1 of 4
Toro Bid Scheulde
39 0330406017MIDWESTGUARDRAILSYSTEM (WOOD POSTW/WOODBLOCK,RUSTIC BROWN) 990 Linear Foot/Feet $66.75 $66,082.50
40 0330406035IN-LINE TERMINAL SYSTEM (TYPE SKT-W-MGS, RUSTIC BROWN) 1 Each $7,885.00 $7,885.00 41 0330406039MIDWESTGUARDRAILSYSTEMENDANCHORASSEMBLY(TYPESFT)PER CALTRANS STD PLAN A77S1, RUSTIC BROWN 1 Each $2,720.00 $2,720.00 42 033061510518" RCP 152 Linear Foot/Feet $580.00 $88,160.00 43 033061510724" RCP 766 Linear Foot/Feet $232.00 $177,712.00 44 03306151714" DUCTILE IRON PIPE WITH MITERED DRAIN AND GRATE ENDS 82 Linear Foot/Feet $99.00 $8,118.00 45 0330615707CATCH BASIN PER SPPWC STD PLAN 300-4, W=7' 1 Each $10,389.00 $10,389.00 46 0330615707CATCH BASIN PER SPPWC STD PLAN 300-4, W=10' 1 Each $12,560.00 $12,560.00 47 0330615731LOCAL DEPRESSION PER SPPWC STD PLAN 313-4, CASE B 61 Linear Foot/Feet $66.90 $4,080.90 48 3306157733MODIFY EXISTING CATCH BASIN 2 Each $6,267.00 $12,534.00 49 033061576030"X30" PRECAST CONCRETE DROP INLET CATCH BASIN 1 Each $9,627.00 $9,627.00 50 0330615771MANHOLE PER SPPWC STD PLAN 321 2 Each $18,470.00 $36,940.00 51 N/A CONCRETE MANHOLE COLLAR 1 Each $1,567.00 $1,567.00 52 0331404105TRAFFIC LANE LINES, DETAIL 12 19,611 Linear Foot/Feet $0.75 $14,708.25 53 0331404111LEFT EDGE LINES, DETAIL 24 6,301 Linear Foot/Feet $1.10 $6,931.10 54 0331404113RIGHT EDGE LINES, DETAIL 27B 5,071 Linear Foot/Feet $1.20 $6,085.20 55 0331404117MEDIAN ISLANDS, DETAIL 29 270 Linear Foot/Feet $3.55 $958.50 56 0331404125LANE DROP AT INTERSECTIONS, DETAIL 37B 1,839 Linear Foot/Feet $0.95 $1,747.05 57 0331404127CHANNELIZING LINE, DETAIL 38 4,615 Linear Foot/Feet $1.70 $7,845.50 58 0331404129BIKE LANE LINE, DETAIL 39 4,813 Linear Foot/Feet $1.20 $5,775.60 59 0331404131BIKE LANE INTERSECTION LINE, DETAIL 39A 2,082 Linear Foot/Feet $0.75 $1,561.50 60 0331404133LANE LINE EXTENSIONS THROUGH INTERSECTIONS, DETAIL 401,361 Linear Foot/Feet $1.25 $1,701.25 61 0331404155TYPE IV (L/R) ARROW 48 Each $135.00 $6,480.00 62 0331404165BIKE LANE ARROW 14 Each $113.50 $1,589.00 63 0331404167BIKE LANE SYMBOL W/ PERSON 14 Each $126.30 $1,768.20 64 0331404173SHARED ROADWAY BICYCLE MARKING 7 Each $223.00 $1,561.00 65 N/A 12" DIAGONAL STRIPE 1,276 Linear Foot/Feet $5.70 $7,273.20 66 0331404127LANELINE DETAIL 38A 475 Linear Foot/Feet $1.70 $807.50 67 03314041056" SOLID STRIPE 1,400 Linear Foot/Feet $1.40 $1,960.00 68 N/A PAVEMENT MARKING CONTINENTAL CROSSWALK PER CITY STD6,084 Square Foot/Feet $4.15 $25,248.60 69 033140409312" SOLID STRIPE 792 Linear Foot/Feet $5.70 $4,514.40 70 0331405003INSTALL FIRE HYDRANT LOCATION RPM 11 Each $12.95 $142.45 71 0331506007RELOCATE SIGN AND POST 2 Each $201.00 $402.00 72 0331506009REMOVE SIGN 33 Each $50.40 $1,663.20
73 0331506013REMOVE SIGN AND POST 8 Each $72.10 $576.80 74 0331506015FURNISH AND INSTALL SIGN ONLY 41 Each $135.35 $5,549.35 75 0331506017FURNISH AND INSTALL SIGN AND POST 29 Each $275.00 $7,975.00 76 0440107203REMOVE AC PAVEMENT 115,000Square Foot/Feet $3.80 $437,000.00 2 of 4
Toro Bid Scheulde
77 0440107205SAW CUT ASPHALT CONCRETE PAVEMENT 10,360 Linear Foot/Feet $2.05 $21,238.00 78 0440107207REMOVE AC PAVEMENT (ON EDISON PROPERTY) 1,606 Square Foot/Feet $2.75 $4,416.50 79 0440107209SAW CUT ASPHALT CONCRETE PAVEMENT (ON EDISON PROPERTY)32 Linear Foot/Feet $16.40 $524.80 80 0440107311SAW CUT CONCRETE PAVEMENT 140 Linear Foot/Feet $3.75 $525.00 81 0440107323REMOVE PCC CURB, TYPE A1-6 50 Linear Foot/Feet $13.70 $685.00 82 0440107371REMOVE PCC CURB & GUTTER, TYPE A2-8, W=2' 450 Linear Foot/Feet $21.10 $9,495.00 83 0440107389REMOVE PCC GUTTER, 2' WIDE 20 Linear Foot/Feet $15.50 $310.00 84 0440107399REMOVE PCC WALK, 4" THICK 1,820 Square Foot/Feet $3.00 $5,460.00 85 0440107407REMOVE PCC DRIVEWAYS, 6" THICK 910 Square Foot/Feet $4.65 $4,231.50 86 0440107411REMOVE STAMPED & COLORED CONCRETE, 4" THICK 2,205 Square Foot/Feet $3.10 $6,835.50 87 0440107419REMOVE PCC CURB RAMPS 1 Each $500.00 $500.00 88 0440107509REMOVE EXISTING FENCE 52 Linear Foot/Feet $23.25 $1,209.00 89 0440107577REMOVE AC DIKE CURB 859 Linear Foot/Feet $2.00 $1,718.00 90 0440412003 COLD MILL AC PAVEMENT (2.5") 212,000Square Foot/Feet $0.64 $135,680.00 91 0440412005COLD MILL AC PAVEMENT (3") 375,305Square Foot/Feet $0.68 $255,207.40 92 0440605003SURFACE UTILITY ADJUSTMENT, SURVEY MONUMENT COVER 5 Each $2,235.00 $11,175.00 93 0660101003 TEMPORARY TRAFFIC CONTROL PHASE 1 1 Lump-Sum $19,045.00 $19,045.00 94 0660101003 TRAFFIC CONTROL STAGE 1 1 Lump-Sum $119,300.00 $119,300.00 95 0660101003 TRAFFIC CONTROL STAGE 2 1 Lump-Sum $105,975.00 $105,975.00 96 0660101003 TEMPORARY TRAFFIC CONTROL PHASE 2 1 Lump-Sum $75,500.00 $75,500.00 97 0770117251(S)TRAFFIC SIGNAL MODIFICATIONS (S) 1 Lump-Sum $121,880.00 $121,880.00 98 07701120393" CONDUIT (SCH 80 PVC) 330 Linear Foot/Feet $223.05 $73,606.50 99 N/A 6" SLEEVE DIRECTIONAL BORE 100 Linear Foot/Feet $507.00 $50,700.00 100 N/A CONNECT CONDUIT TO PULLBOX 4 Each $3,698.00 $14,792.00 101 0880108015FURNISH AND PLANT 15 GALLON SHRUB 298 Each $89.80 $26,760.40 102 0880108019 FURNISH AND PLANT 24" BOX TREE 52 Each $581.00 $30,212.00 103 0880108021 FURNISH AND PLANT 1 GALLON SHRUBS 302 Each $11.65 $3,518.30 104 0880108023 FURNISH AND PLANT 5 GALLON SHRUBS 448 Each $45.45 $20,361.60 105 0880108039 TREE BUBBLERS 126 Each $31.70 $3,994.20 106 0880108041 SHRUB BUBBLERS (INCL STREAM & BUBLER ON RISER) 998 Each $28.50 $28,443.00 107 0880108043 IRRIGATION CONTROLLER 1 Each $1,268.00 $1,268.00 108 0880108045 IRRIGATION CONTROLLER WIRE 52,125 Linear Foot/Feet $1.32 $68,805.00 109 08801080471” REMOTE CONTROL VALVE 29 Each $554.65 $16,084.85 110 0880108049 1-1/4” REMOTE CONTROL VALVE 1 Each $715.00 $715.00 111 0880108053 QUICK COUPLER 13 Each $264.10 $3,433.30 112 0880108055 FLUSH VALVE 84 Each $52.80 $4,435.20
113 0880108057 FURNISH AND INSTALL IRRIGATION PULL BOX 8 Each $179.60 $1,436.80 114 0880108061 CLASS 315 PIPE SLEEVE, 6” 550 Linear Foot/Feet $26.40 $14,520.00 3 of 4
Toro Bid Scheulde
115 0880108063FIRST PLANT MAINTENANCE AND ESTABLISHMENT PERIOD (DAYS 1 - 90) 1 Lump-Sum $12,680.00 $12,680.00
116 0880108065SECOND PLANTMAINTENANCEANDESTABLISHMENTPERIOD(DAYS91- 180) 1 Lump-Sum $12,680.00 $12,680.00
117 0880108068LODGEPOLE FENCING 1,000 Linear Foot/Feet $66.55 $66,550.00 118 0880108077CONCRETE UNIT PAVERS ATOP CONCRETE (INCL MORTAR AND CONCRETE BASE) 9,542 Square Foot/Feet $34.45 $328,721.90 119 0880108085 PLANTING AREA SOIL PREP AND AMENDMENTS (INCL TESTING OF IMPORT SOIL) 25,517Square Foot/Feet $0.50 $12,758.50
120 0880108087 PLANTING AREA FINE GRADING 25,517Square Foot/Feet $0.35 $8,930.95 121 0880108091 PROTECTION OF EXISTING TREES TO REMAIN 11 Each $472.00 $5,192.00 122 0880108093 ROOT / MOISTURE BARRIER 3,500 Linear Foot/Feet $12.15 $42,525.00 123 0880108095 3” ORGANIC MULCH 237 Cubic Yard $81.35 $19,279.95 124 0880108096DEMOLISH & DISPOSE EXISTING MONUMENT SIGN BASE AND SALVAGE MONUMENT SIGN 1 Lump-Sum $3,900.00 $3,900.00
125 N/A CONSTRUCT NEW MONUMENT BASE & INSTALL SALVAGED SIGN 1 Lump-Sum $26,500.00 $26,500.00 126 0880108054 GATE VALVE 4 Each $422.60 $1,690.40
127 00880021301-1/2" MAINLINE (SCH. 40 PVC) 2,359 Linear Foot/Feet $12.70 $29,959.30 128 00880021311 1/2" LATERAL LINE (SCH. 40 PVC) 113 Linear Foot/Feet $5.00 $565.00 129 00880021321 1/4" LATERAL LINE (SCH. 40 PVC) 318 Linear Foot/Feet $4.75 $1,510.50 130 00880021331" LATERAL LINE (SCH. 40 PVC) 276 Linear Foot/Feet $4.75 $1,311.00 131 00880021343/4" LATERAL LINE (SCH. 40 PVC) 7,745 Linear Foot/Feet $4.25 $32,916.25 132 N/A INSTALL TEMPORARY VIDEO DETECTION SYSTEM (S) 4 Each $11,320.00 $45,280.00 133 N/A REMOVE AND INSTALL PERMANENT TRAFFIC LOOPS (S) 40 Each $825.00 $33,000.00 BID TOTAL $6,908,231.45
4 of 4
Bid Proposal for Toro Enterprises, Inc. (available in the City Clerk's Reading File)
Santa Clarita City Council
December 9, 2025
- Document
- Bid Proposal for Toro Enterprises, Inc. (available in the City Clerk's Reading File)
- Meeting
- December 9, 2025
- Body
- Santa Clarita City Council
- Original file
- 17.6 MB
Text extracted from the city's file for reading and search. Open the original on santaclaritacityca.iqm2.com. That file is the official record.