Cities Index.
Bid Proposal for Waisman Construction, Inc. (available in the City Clerk's Reading File)

Santa Clarita City Council
December 9, 2025

Document
Bid Proposal for Waisman Construction, Inc. (available in the City Clerk's Reading File)
Meeting
December 9, 2025
Body
Santa Clarita City Council
Original file
54.2 MB
Text extracted from the city's file for reading and search. Open the original on santaclaritacityca.iqm2.com. That file is the official record.

Group ID/Name Group Type Code Description UOM Quantity Price (max. 2 decimal places) * Comment Total Cost Division 01/General Requirements Standard 1 General Conditions Lump-Sum 1 90000 90000Division 01/General Requirements Standard 2 Insurance, Overhead & Fee Lump-Sum 1 241000 241000Division 02/Demolition Standard 3 Partitions, Doors, Ceilings, Finishes, Elec Lump-Sum 1 20000 20000Division 02/Demolition Standard 4 Haul away and disposal Lump-Sum 1 30000 30000Division 03/Concrete Standard 5 Cast-In-Place Concrete Lump-Sum 1 10000 10000Division 05/Metals Standard 6 Structural Steel Framing, Modifications Lump-Sum 1 100000 100000Division 05/Metals Standard 7 Metal Fabrications Lump-Sum 1 5000 5000Division 06/Millwork / Carpentry Standard 8 Rough Carpentry Lump-Sum 1 30000 30000Division 06/Millwork / Carpentry Standard 9 Architectural Wood Casework Lump-Sum 1 27000 27000Division 07/Thermal & Moisture Prot. Standard 10 Insulation - Partitions, above ceiling Lump-Sum 1 15000 15000Division 07/Thermal & Moisture Prot. Standard 11 Roofing patching / Modifications Lump-Sum 1 15000 15000Division 07/Thermal & Moisture Prot. Standard 12 Joint Sealants Lump-Sum 1 7000 7000Division 08/Doors & Glazing Standard 13 Wood/Metal Doors, Frames, Hardware Lump-Sum 1 16000 16000Division 08/Doors & Glazing Standard 14 Inter. Glass Ofc. Fronts (Alum frame/glass) Lump-Sum 1 10000 10000Division 08/Doors & Glazing Standard 15 Sound Control Windows Lump-Sum 1 20000 20000Division 08/Doors & Glazing Standard 16 Glazing Lump-Sum 1 4000 4000Division 09/Finishes Standard 17 Metal Stud framing & Drywall Partitions Lump-Sum 1 145000 145000Division 09/Finishes Standard 18 Acoustical Ceilings - Grid and Tile Lump-Sum 1 75000 75000Division 09/Finishes Standard 19 Paint & Wallcoverings (Drywall surf/Accents) Lump-Sum 1 18000 18000Division 09/Finishes Standard 20 Floor Coverings Lump-Sum 1 15000 15000Division 09/Finishes Standard 21 Exposed Concrete Floor Finishing Lump-Sum 1 25000 25000Division 09/Finishes Standard 22 Sound Absorbing Sound Units Lump-Sum 1 10000 10000Division 10/Specialties Standard 23 Panel Signage Lump-Sum 1 4000 4000Division 10/Specialties Standard 24 Fire Sprinkler System Modifications Lump-Sum 1 10000 10000Division 12/Furnishings Standard 25 Contertops Lump-Sum 1 5000 5000Division 21/Fire Protection Standard 26 Fire Extinguisher Cabinets Lump-Sum 1 1000 1000Division 22/Plumbing Standard 28 Alterations / Replace Fixtures Lump-Sum 1 5000 5000Division 23/HVAC Standard 29 Ductwork, Diffusers, Controls Lump-Sum 1 60000 60000Division 23/HVAC Standard 30 New Roof Mtd. Equipment and Access. Lump-Sum 1 30000 30000Division 26/Electrical Standard 31 Power Distribution (Conduit, Outlets, Panels) Lump-Sum 1 270000 270000Division 26/Electrical Standard 32 Lighting Fixtures, wiring, controls Lump-Sum 1 200000 200000Division 28/Fire Life Safety Standard 33 Fire Alarm Systme Modifications Lump-Sum 1 53000 53000Division 32/Final Cleaning Standard 34 Construction Cleaning (Turnover Ready) Lump-Sum 1 10000 10000Cost Allowance/Permits & Fees Cost Allowance 35 Cost Allowance-Permits & Fees 5000 N/A 5000Division 21/Fire Protection Standard 27 Fire Sprinkler Alterations Lump-Sum 1 5000 5000

← All documents from this meeting