2025-26 Overlay C Project
Estimated Contract Value ($2000000)
Total Awarded Value $ 0.00
Code Description UOM Code Quantity Price Total Cost Bid Rank 1 Mobilization, Bonds & Insurance Lump-Sum 1 1 30000 30000 1 2 Traffic Control Lump-Sum 2 1 83000 83000 1
3 Storm Water Pollution Control
Program
Lump-Sum 3 1 5600 5600 2
4 TMO Ton 4 6003 142 852426 1
5 Stabilization Allowance Square Foot/Feet 5 60978 0.7 42684.6 1 6 Keycut A1 Linear Foot/Feet 6 18430 2.9 53447 1
7 Keycut B1 Linear Foot/Feet 7 215 11 2365 1
8 Lower Manhole Covers to Finish
Grade
Each 8 41 385 15785 2
9 Lower Gas Covers to Finish Grade Each 9 12 285 3420 2 10 Lower Water Valve Covers to Finish
Grade
Each 10 32 215 6880 2
11 Adjust Manhole Covers to Finish
Grade
Each 11 41 760 31160 1
12 Adjust Gas Covers to Finish Grade Each 12 12 285 3420 1 13 Adjust Water Valve Covers to Finish
Grade
Each 13 32 320 10240 2
14 Install Blue RPM's @ Fire Hydrant Each 14 16 15 240 3 15 12" White Crosswalk/Limit Line
(Thermo)
Linear Foot/Feet 15 475 5.25 2493.75 4
16 Striping Detail #12 (Thermo &
Markers)
Linear Foot/Feet 16 18163 0.62 11261.06 2
17 Striping Detail #21 (Markers) Linear Foot/Feet 17 771 1.6 1233.6 4 18 Striping Detail #22 (Thermo &
Markers)
Linear Foot/Feet 18 544 2.4 1305.6 4
19 Striping Detail #25 (Thermo &
Markers)
Linear Foot/Feet 19 7772 1.05 8160.6 4
20 Striping Detail #27B (Markers) Linear Foot/Feet 20 12886 1.07 13788.02 4 21 Striping Detail #29 (Thermo) Linear Foot/Feet 21 4300 3.1 13330 4 22 Striping Detail #38 (Thermo &
Markers)
Linear Foot/Feet 22 4443 1.55 6886.65 4
23 Striping Detail #39A (Thermo) Linear Foot/Feet 23 600 0.65 390 2 24 Striping Detail #40 (Thermo) Linear Foot/Feet 24 1325 0.7 927.5 1 25 Arrow Type I (Thermo) Each 25 3 230 690 4
26 Arrow Type IV (L/R) (Thermo) Each 26 26 148 3848 3
29 Install Shoulder Backing Linear Foot/Feet 29 11113 3.6 40006.8 3 Project 1 Project 1
Toro Enterprises, Inc.
Project Total : $ 1244989.18
Group Total : $ 1244989.18